Items where Year is 1988
A
Abdullah, R Z (1988) Integrated systems for site management. PhD thesis, Loughborough University, UK.
Ahmad, I U (1988) Bidding strategy: Multicriteria decision-making approach. PhD thesis, University of Cincinnati, USA.
Al-Bahar, J F (1988) Risk management in construction projects: A systematic analytical approach for contractors. PhD thesis, University of California, Berkeley, USA.
Al-Mansouri, O (1988) The relationship between the designer and contractor in Saudi Arabia. PhD thesis, University of Reading, UK.
Alkass, S and Harris, F (1988) Expert system for earthmoving equipment selection in road construction. Journal of Construction Engineering and Management, 114(3), pp. 426-440. ISSN 0733-9364
Alkass, S T (1988) An expert system applied to earthmoving operations and equipment selection. PhD thesis, Loughborough University, UK.
Allam, S I G (1988) Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(2), pp. 93-115. ISSN 01446193
Andersson, L (1988) The theory of possibility and fuzzy sets: New ideas for risk analysis and decision-making. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.
Aniekwu, A N and Okpala, C D (1988) The effect of systemic factors on contract services in Nigeria. Construction Management and Economics, 6(2), pp. 171-182. ISSN 01446193
Aniekwu, A N and Okpala, D C (1988) Contractual arrangements and the performance of the Nigerian construction industry (the structural component). Construction Management and Economics, 6(1), pp. 3-11. ISSN 01446193
Arlani, A G and Rakhra, A S (1988) Building code assessment framework. Construction Management and Economics, 6(2), pp. 117-131. ISSN 01446193
Asif, M (1988) Simple generic models for cost-significant estimating of construction project costs. PhD thesis, University of Dundee, UK.
Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.
B
Baggett, B L (1988) Analysis of the role of financial engineering in the marketing of major international construction projects. DBA thesis, George Washington University, USA.
Barton, D A (1988) The effects of step changes on the construction industry: A study of the reaction of construction industries to change. PhD thesis, University of Reading, UK.
Bell, L C and McCullouch, B G (1988) Bar code applications in construction. Journal of Construction Engineering and Management, 114(2), pp. 263-278. ISSN 0733-9364
Berny, J (1988) Forecasting and risk analysis applied to management planning and control. PhD thesis, Aston University, UK.
Bon, R (1988) Replacement simulation model: A framework for building portfolio decisions. Construction Management and Economics, 6(2), pp. 149-159. ISSN 01446193
Branche, C M (1988) An assessment of conditional risks for severe occupational traumatic injury during falls from elevations at work among North Carolina construction workers. PhD thesis, University of North Carolina at Chapel Hill, USA.
C
Chang, L M; Hancher, D E; Napier, T R and Kapolnek, R G (1988) Methods to identify and assess new building technology. Journal of Construction Engineering and Management, 114(3), pp. 408-425. ISSN 0733-9364
Chau, K W and Walker, A (1988) The measurement of total factor productivity of the Hong Kong construction industry. Construction Management and Economics, 6(3), pp. 209-224. ISSN 01446193
Clarke, R N (1988) A managerial approach to forecasting for the construction industry. PhD thesis, Queen's University Belfast, UK.
D
De La Garza-Rodriguez, J M (1988) A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Deshpande, S D (1988) Some facility planning techniques for construction site layouts. PhD thesis, Indian Institute of Technology Delhi, India.
Diekmann, J E and Kraiem, Z (1988) Explanation of construction engineering knowledge in expert systems. Journal of Construction Engineering and Management, 114(3), pp. 364-389. ISSN 0733-9364
de Leeuw, C P (1988) The pre-estimation of compensation payable in accordance with the contract price adjustment provisions of the building industry advisory council. DSc thesis, University of Pretoria, South Africa.
de Villiers, A J (1988) Procurement of rural primary schools in southern Africa: An approach to resource optimization. PhD thesis, University of Pretoria, South Africa.
E
Easa, S M (1988) Earthwork allocations with linear unit costs. Journal of Construction Engineering and Management, 114(4), pp. 641-655. ISSN 0733-9364
Echeverry, D; Ibbs, C W and Burati, J (1988) Graduated unit price payment schedules. Journal of Construction Engineering and Management, 114(1), pp. 1-18. ISSN 0733-9364
Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364
Eldukair, Z A R (1988) Safety assessment and optimization of construction operations based on fuzzy sets. PhD thesis, University of Maryland, College Park, USA.
F
Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193
Felix, R (1988) The use of domestic building products by the owner-builder. PhD thesis, University of Leeds, UK.
Felllows, R F (1988) Escalation management. PhD thesis, University of Reading, UK.
Firman, Tommy (1988) Labor flows and the construction industry: The case of housing development in Bandung, Indonesia. PhD thesis, University of Hawaii at Manoa, USA.
G
Glavan, J R (1988) Analysis of design-related problems from an industrial project. PhD thesis, University of Texas at Austin, USA.
Gould, C H (1988) Rolling fours: Novel work schedule. Journal of Construction Engineering and Management, 114(4), pp. 577-593. ISSN 0733-9364
Griffis, F H and Butler, M (1988) Case for cost-plus contracting. Journal of Construction Engineering and Management, 114(1), pp. 83-94. ISSN 0733-9364
Grobler, F (1988) Object-oriented data representation for unified construction project information. PhD thesis, University of Illinois at Urbana-Champaign, USA.
H
Habib, M R (1988) The relative effectiveness of large-scale public and private construction contractors: The case of Egypt. DSc thesis, George Washington University, USA.
Hagerty, D J; Schmitt, N G and Vandevelde, G T (1988) Shot-rock fill construction: Case history. Journal of Construction Engineering and Management, 114(3), pp. 489-502. ISSN 0733-9364
Hall, N L (1988) The history and potential of thatching. PhD thesis, Open University, UK.
Hanna, B A (1988) Role expectations of superintendents and architects in the state of Kansas relative to experience in school construction. EdD thesis, University of Kansas, USA.
Hanna Jr., H M (1988) The use of construction management in school building construction. EdD thesis, University of Missouri - Columbia, USA.
Herzog, H W and Schlottmann, A M (1988) Local business cycle severity and induced labour mobility: The case of the construction workforce. Construction Management and Economics, 6(3), pp. 247-258. ISSN 01446193
Hinze, J and Parker, R (1988) Productivity study on extruded concrete curbing operations. Journal of Construction Engineering and Management, 114(2), pp. 256-262. ISSN 0733-9364
Hinze, J and Raboud, P (1988) Safety on large building construction projects. Journal of Construction Engineering and Management, 114(2), pp. 286-293. ISSN 0733-9364
Huang, P-D (1988) Impact of CADD technology on the architectural community. PhD thesis, University of Illinois at Urbana-Champaign, USA.
I
Ioannou, P G (1988) Bidding models: symmetry and state of information. Journal of Construction Engineering and Management, 114(2), pp. 214-232. ISSN 0733-9364
Ioannou, P G (1988) Geologic exploration and risk reduction in underground construction. Journal of Construction Engineering and Management, 114(4), pp. 532-547. ISSN 0733-9364
Ioannou, P G (1988) Pilot tunnels: Contractor's position. Journal of Construction Engineering and Management, 114(4), pp. 594-613. ISSN 0733-9364
Ioannou, P G and Carr, R I (1988) Advanced building technology matrix system. Journal of Construction Engineering and Management, 114(4), pp. 517-531. ISSN 0733-9364
Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.
J
Jaselskis, E J (1988) Achieving construction project success through predictive discrete choice models. PhD thesis, University of Texas at Austin, USA.
Jesson, J K (1988) Ethnic minority builders: a comparative study of Britain and the United States of America on affirmative action in the building industry. PhD thesis, Aston University, UK.
K
Kangari, R (1988) Business failure in construction industry. Journal of Construction Engineering and Management, 114(2), pp. 172-190. ISSN 0733-9364
Kangari, R; Pruitt, J D and Cheema, T S (1988) Slipforming IBM tower. Journal of Construction Engineering and Management, 114(3), pp. 472-488. ISSN 0733-9364
Kangari, R and Riggs, L S (1988) Portfolio management in construction. Construction Management and Economics, 6(2), pp. 161-169. ISSN 01446193
Karafiath, L L (1988) Rolling resistance of off-road vehicles. Journal of Construction Engineering and Management, 114(3), pp. 458-471. ISSN 0733-9364
Kashiwagi, K; Rubin, R A and Harris, M R (1988) Construction law and practice in Japan. Journal of Construction Engineering and Management, 114(1), pp. 104-113. ISSN 0733-9364
Keirouz, W T (1988) Domain modeling of constructed facilities for robotic applications. PhD thesis, Carnegie Mellon University, USA.
Kirby, J G; Furry, D A and Hicks, D K (1988) Improvements in design review management. Journal of Construction Engineering and Management, 114(1), pp. 69-82. ISSN 0733-9364
Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.
Kuprenas, J A (1988) Use of influence diagrams to assess the cost and schedule impact of construction changes. DEng thesis, University of California, Berkeley, USA.
L
Laufer, A and Tucker, R L (1988) Competence and timing dilemma in construction planning. Construction Management and Economics, 6(4), pp. 339-355. ISSN 01446193
Levitt, R E; Kartam, N A and Kunz, J C (1988) Artificial intelligence techniques for generating construction project plans. Journal of Construction Engineering and Management, 114(3), pp. 329-343. ISSN 0733-9364
Loper, J H; Marquis, E L and Rhomberg, E J (1988) Precast prestressed long-span bridges. Journal of Construction Engineering and Management, 114(1), pp. 95-103. ISSN 0733-9364
M
Maloney, W F (1988) Substance abuse in construction. Journal of Construction Engineering and Management, 114(4), pp. 614-630. ISSN 0733-9364
Markus, A M (1988) A research discrepancy model for building trades training programs. PhD thesis, University of Florida, USA.
Martin, G L (1988) Training programs for engineering consulting firms. Journal of Construction Engineering and Management, 114(1), pp. 121-132. ISSN 0733-9364
McCullouch, B G (1988) Automatic identification technology applications in industrial construction. PhD thesis, Auburn University, USA.
McFillen, J M and Maloney, W F (1988) New answers and new questions in construction worker motivation. Construction Management and Economics, 6(1), pp. 35-48. ISSN 01446193
McLoud, M (1988) Craftsmen and entrepreneurs: Builders in late nineteenth-century Washington, D.C. PhD thesis, George Washington University, USA.
Miller, K S (1988) The causes of decentralization of the bargaining structure in the construction industry in the state of Ohio. PhD thesis, Ohio State University, USA.
Muehlhausen, F B (1988) Development of the materials management model for construction management curriculum development and a method to translate model information into instruction. PhD thesis, Purdue University, USA.
Musgrave, E C (1988) The building industries of eastern brittany, 1600-1790. PhD thesis, University of Oxford, UK.
N
Nam, C H and Tatum, C B (1988) Major characteristics of constructed products and resulting limitations of construction technology. Construction Management and Economics, 6(2), pp. 133-147. ISSN 01446193
Ndekugri, I E and McCaffer, R (1988) Management information flow in construction companies. Construction Management and Economics, 6(4), pp. 273-294. ISSN 01446193
O
Ofori, G (1988) Construction industry and economic growth in Singapore. Construction Management and Economics, 6(1), pp. 57-70. ISSN 01446193
Okpala, D C and Aniekwu, A N (1988) Causes of high costs of construction in Nigeria. Journal of Construction Engineering and Management, 114(2), pp. 233-244. ISSN 0733-9364
Olomolaiye, P O (1988) An evaluation of bricklayers' motivation and productivity. PhD thesis, Loughborough University, UK.
Oloufa, A A (1988) A framework for the operational simulation of construction projects. PhD thesis, University of California, Berkeley, USA.
Oussadou, A (1988) Residential satisfaction in the new urban housing projects in Algeria: a case study of Ain-Allah, Algiers. PhD thesis, University of Nottingham, UK.
O’Connor, J T and Davis, V S (1988) Constructability improvement during field operations. Journal of Construction Engineering and Management, 114(4), pp. 548-564. ISSN 0733-9364
P
Pain, J (1988) Design-build and the traditional approach: A comparative study with particular reference to the JCT 'with contractor's design' 1981 form of contract. PhD thesis, University of Reading, UK.
Pain, J and Bennett, J (1988) JCT with contractor's design form of contract: A study in use. Construction Management and Economics, 6(4), pp. 307-337. ISSN 01446193
Perkowski, J C (1988) Technical trends in the e and c business: The next 10 years. Journal of Construction Engineering and Management, 114(4), pp. 565-576. ISSN 0733-9364
Perng, Y-H (1988) An intelligent system approach for construction risk identification. PhD thesis, University of Texas at Austin, USA.
Pienaar, E J A (1988) A study to identify and evaluate the level of strategic management in the construction industry. DBA thesis, University of Pretoria, South Africa.
Potts, K F (1988) An alternative payment system for major 'fast track' construction projects. Construction Management and Economics, 6(1), pp. 25-33. ISSN 01446193
Prince, M W (1988) Strategic planning in construction firms: Perceptions and personal characteristics of the manager, strategic planning behaviour, and subjective performance in a large scale survey of the canadian construction industry. PhD thesis, University of Bradford, UK.
Q
Quah, L K (1988) An evaluation of the risks in estimating and tendering for refurbishment work. PhD thesis, Heriot-Watt University, UK.
R
Rajagopalan, K S (1988) Supports for traveling cranes: Case history. Journal of Construction Engineering and Management, 114(1), pp. 114-120. ISSN 0733-9364
Riggs, L S (1988) Educating construction managers. Journal of Construction Engineering and Management, 114(2), pp. 279-285. ISSN 0733-9364
Ringwald, R C (1988) Applications of centrifugal pumps. Journal of Construction Engineering and Management, 114(4), pp. 659-663. ISSN 0733-9364
Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts. PhD thesis, Brunel University, UK.
Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(4), pp. 357-370. ISSN 01446193
Runeson, K G (1988) Methodology and method for price-level forecasting in the building industry. Construction Management and Economics, 6(1), pp. 49-55. ISSN 01446193
Russell, A D and Caselton, W F (1988) Extensions to linear scheduling optimization. Journal of Construction Engineering and Management, 114(1), pp. 36-52. ISSN 0733-9364
Russell, J S (1988) A knowledge-based system approach to the contractor prequalification process. PhD thesis, Purdue University, USA.
S
Sani, H (1988) An investigation into the influences upon and determinants of perceived quality achievement in the management of construction projects by multivariate analysis. PhD thesis, Heriot-Watt University, UK.
Sanvido, V E (1988) Conceptual construction process model. Journal of Construction Engineering and Management, 114(2), pp. 294-310. ISSN 0733-9364
Shamma, E M (1988) A dynamic model for the growth of construction firms. DSc thesis, George Washington University, USA.
Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.
Sherif, A H (1988) The choice of construction technology in developing countries: A socially conscious economic assessment approach. DArch thesis, University of Michigan, USA.
Sherman, P J (1988) Japanese construction R&D: Entrèe into U.S. Market. Journal of Construction Engineering and Management, 114(1), pp. 133-143. ISSN 0733-9364
Shtub, A (1988) The integration of CPM and material management in project management. Construction Management and Economics, 6(4), pp. 261-272. ISSN 01446193
Skibniewski, M and Hendrickson, C (1988) Analysis of robotic surface finishing work on construction site. Journal of Construction Engineering and Management, 114(1), pp. 53-68. ISSN 0733-9364
Skitmore, R M and Marsden, D E (1988) Which procurement system? Towards a universal procurement selection technique. Construction Management and Economics, 6(1), pp. 71-89. ISSN 01446193
Steiger, T L (1988) Working construction: Organization and control of the labor process. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.
Stewart, W S and Tatum, C B (1988) Segmental placement of Renton outfall: Construction innovation. Journal of Construction Engineering and Management, 114(3), pp. 390-407. ISSN 0733-9364
Sweis, R K (1988) Construction insurance in the Arab Gulf area: an analysis of cover and contracts. PhD thesis, City, University of London, UK.
T
Tan, W (1988) GNP, interest rate and construction investment: Empirical evidence from U.S. data. Construction Management and Economics, 6(3), pp. 185-193. ISSN 01446193
Tatum, C B (1988) Classification system for construction technology. Journal of Construction Engineering and Management, 114(3), pp. 344-363. ISSN 0733-9364
Tatum, C B and Funke, A T (1988) Partially automated grading: Construction process innovation. Journal of Construction Engineering and Management, 114(1), pp. 19-35. ISSN 0733-9364
Thomas, H R and Willenbrock, J H (1988) Managing construction research at universities. Journal of Construction Engineering and Management, 114(2), pp. 245-255. ISSN 0733-9364
Thuse, D G (1988) Road transport investment model using dynamic programming. PhD thesis, Indian Institute of Technology, Bombay, India.
Tomlinson, D P and Rhomberg, E J (1988) Contract officer in military service contracts. Journal of Construction Engineering and Management, 114(3), pp. 441-457. ISSN 0733-9364
Touran, A and Taher, K A H (1988) Optimum fleet size determination by queuing and simulation. Construction Management and Economics, 6(4), pp. 295-306. ISSN 01446193
Tucker, R L (1988) Perfection of the buggy whip. Journal of Construction Engineering and Management, 114(2), pp. 157-171. ISSN 0733-9364
Tucker, S N (1988) A single alternative formula for department of health and social security S-curves. Construction Management and Economics, 6(1), pp. 13-23. ISSN 01446193
V
Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.
W
Whiteman, W E and Irwig, H G (1988) Disturbance scheduling technique for managing renovation work. Journal of Construction Engineering and Management, 114(2), pp. 191-213. ISSN 0733-9364
Willmer, G (1988) Development of risk models for engineering construction projects. PhD thesis, University of Manchester, UK.
Wilson, O D and Sharpe, K (1988) Tenders and estimates: A probabilistic model. Construction Management and Economics, 6(3), pp. 225-245. ISSN 01446193
Y
Young, B A (1988) Career development in construction management. PhD thesis, University of Manchester, UK.
Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.
Up a level