Items where Year is 1988

Group by: Author(s) | Item Type | No Grouping
Number of items: 128.

Abdullah, R Z (1988) Integrated systems for site management. PhD thesis, Loughborough University, UK.

Ahmad, I U (1988) Bidding strategy: Multicriteria decision-making approach. PhD thesis, University of Cincinnati, USA.

Al-Bahar, J F (1988) Risk management in construction projects: A systematic analytical approach for contractors. PhD thesis, University of California, Berkeley, USA.

Al-Mansouri, O (1988) The relationship between the designer and contractor in Saudi Arabia. PhD thesis, University of Reading, UK.

Alkass, S and Harris, F (1988) Expert system for earthmoving equipment selection in road construction. Journal of Construction Engineering and Management, 114(3), pp. 426-440. ISSN 0733-9364

Alkass, S T (1988) An expert system applied to earthmoving operations and equipment selection. PhD thesis, Loughborough University, UK.

Allam, S I G (1988) Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(2), pp. 93-115. ISSN 01446193

Andersson, L (1988) The theory of possibility and fuzzy sets: New ideas for risk analysis and decision-making. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Aniekwu, A N and Okpala, C D (1988) The effect of systemic factors on contract services in Nigeria. Construction Management and Economics, 6(2), pp. 171-182. ISSN 01446193

Aniekwu, A N and Okpala, D C (1988) Contractual arrangements and the performance of the Nigerian construction industry (the structural component). Construction Management and Economics, 6(1), pp. 3-11. ISSN 01446193

Arlani, A G and Rakhra, A S (1988) Building code assessment framework. Construction Management and Economics, 6(2), pp. 117-131. ISSN 01446193

Asif, M (1988) Simple generic models for cost-significant estimating of construction project costs. PhD thesis, University of Dundee, UK.

Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.

Baggett, B L (1988) Analysis of the role of financial engineering in the marketing of major international construction projects. DBA thesis, George Washington University, USA.

Barton, D A (1988) The effects of step changes on the construction industry: A study of the reaction of construction industries to change. PhD thesis, University of Reading, UK.

Bell, L C and McCullouch, B G (1988) Bar code applications in construction. Journal of Construction Engineering and Management, 114(2), pp. 263-278. ISSN 0733-9364

Berny, J (1988) Forecasting and risk analysis applied to management planning and control. PhD thesis, Aston University, UK.

Bon, R (1988) Replacement simulation model: A framework for building portfolio decisions. Construction Management and Economics, 6(2), pp. 149-159. ISSN 01446193

Branche, C M (1988) An assessment of conditional risks for severe occupational traumatic injury during falls from elevations at work among North Carolina construction workers. PhD thesis, University of North Carolina at Chapel Hill, USA.

Chang, L M; Hancher, D E; Napier, T R and Kapolnek, R G (1988) Methods to identify and assess new building technology. Journal of Construction Engineering and Management, 114(3), pp. 408-425. ISSN 0733-9364

Chau, K W and Walker, A (1988) The measurement of total factor productivity of the Hong Kong construction industry. Construction Management and Economics, 6(3), pp. 209-224. ISSN 01446193

Clarke, R N (1988) A managerial approach to forecasting for the construction industry. PhD thesis, Queen's University Belfast, UK.

De La Garza-Rodriguez, J M (1988) A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Deshpande, S D (1988) Some facility planning techniques for construction site layouts. PhD thesis, Indian Institute of Technology Delhi, India.

Diekmann, J E and Kraiem, Z (1988) Explanation of construction engineering knowledge in expert systems. Journal of Construction Engineering and Management, 114(3), pp. 364-389. ISSN 0733-9364

Easa, S M (1988) Earthwork allocations with linear unit costs. Journal of Construction Engineering and Management, 114(4), pp. 641-655. ISSN 0733-9364

Echeverry, D; Ibbs, C W and Burati, J (1988) Graduated unit price payment schedules. Journal of Construction Engineering and Management, 114(1), pp. 1-18. ISSN 0733-9364

Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364

Eldukair, Z A R (1988) Safety assessment and optimization of construction operations based on fuzzy sets. PhD thesis, University of Maryland, College Park, USA.

Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193

Felix, R (1988) The use of domestic building products by the owner-builder. PhD thesis, University of Leeds, UK.

Felllows, R F (1988) Escalation management. PhD thesis, University of Reading, UK.

Firman, Tommy (1988) Labor flows and the construction industry: The case of housing development in Bandung, Indonesia. PhD thesis, University of Hawaii at Manoa, USA.

Glavan, J R (1988) Analysis of design-related problems from an industrial project. PhD thesis, University of Texas at Austin, USA.

Gould, C H (1988) Rolling fours: Novel work schedule. Journal of Construction Engineering and Management, 114(4), pp. 577-593. ISSN 0733-9364

Griffis, F H and Butler, M (1988) Case for cost-plus contracting. Journal of Construction Engineering and Management, 114(1), pp. 83-94. ISSN 0733-9364

Grobler, F (1988) Object-oriented data representation for unified construction project information. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Habib, M R (1988) The relative effectiveness of large-scale public and private construction contractors: The case of Egypt. DSc thesis, George Washington University, USA.

Hagerty, D J; Schmitt, N G and Vandevelde, G T (1988) Shot-rock fill construction: Case history. Journal of Construction Engineering and Management, 114(3), pp. 489-502. ISSN 0733-9364

Hall, N L (1988) The history and potential of thatching. PhD thesis, Open University, UK.

Hanna, B A (1988) Role expectations of superintendents and architects in the state of Kansas relative to experience in school construction. EdD thesis, University of Kansas, USA.

Hanna Jr., H M (1988) The use of construction management in school building construction. EdD thesis, University of Missouri - Columbia, USA.

Herzog, H W and Schlottmann, A M (1988) Local business cycle severity and induced labour mobility: The case of the construction workforce. Construction Management and Economics, 6(3), pp. 247-258. ISSN 01446193

Hinze, J and Parker, R (1988) Productivity study on extruded concrete curbing operations. Journal of Construction Engineering and Management, 114(2), pp. 256-262. ISSN 0733-9364

Hinze, J and Raboud, P (1988) Safety on large building construction projects. Journal of Construction Engineering and Management, 114(2), pp. 286-293. ISSN 0733-9364

Huang, P-D (1988) Impact of CADD technology on the architectural community. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ioannou, P G (1988) Bidding models: symmetry and state of information. Journal of Construction Engineering and Management, 114(2), pp. 214-232. ISSN 0733-9364

Ioannou, P G (1988) Geologic exploration and risk reduction in underground construction. Journal of Construction Engineering and Management, 114(4), pp. 532-547. ISSN 0733-9364

Ioannou, P G (1988) Pilot tunnels: Contractor's position. Journal of Construction Engineering and Management, 114(4), pp. 594-613. ISSN 0733-9364

Ioannou, P G and Carr, R I (1988) Advanced building technology matrix system. Journal of Construction Engineering and Management, 114(4), pp. 517-531. ISSN 0733-9364

Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.

Jaselskis, E J (1988) Achieving construction project success through predictive discrete choice models. PhD thesis, University of Texas at Austin, USA.

Jesson, J K (1988) Ethnic minority builders: a comparative study of Britain and the United States of America on affirmative action in the building industry. PhD thesis, Aston University, UK.

Kangari, R (1988) Business failure in construction industry. Journal of Construction Engineering and Management, 114(2), pp. 172-190. ISSN 0733-9364

Kangari, R; Pruitt, J D and Cheema, T S (1988) Slipforming IBM tower. Journal of Construction Engineering and Management, 114(3), pp. 472-488. ISSN 0733-9364

Kangari, R and Riggs, L S (1988) Portfolio management in construction. Construction Management and Economics, 6(2), pp. 161-169. ISSN 01446193

Karafiath, L L (1988) Rolling resistance of off-road vehicles. Journal of Construction Engineering and Management, 114(3), pp. 458-471. ISSN 0733-9364

Kashiwagi, K; Rubin, R A and Harris, M R (1988) Construction law and practice in Japan. Journal of Construction Engineering and Management, 114(1), pp. 104-113. ISSN 0733-9364

Keirouz, W T (1988) Domain modeling of constructed facilities for robotic applications. PhD thesis, Carnegie Mellon University, USA.

Kirby, J G; Furry, D A and Hicks, D K (1988) Improvements in design review management. Journal of Construction Engineering and Management, 114(1), pp. 69-82. ISSN 0733-9364

Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.

Kuprenas, J A (1988) Use of influence diagrams to assess the cost and schedule impact of construction changes. DEng thesis, University of California, Berkeley, USA.

Laufer, A and Tucker, R L (1988) Competence and timing dilemma in construction planning. Construction Management and Economics, 6(4), pp. 339-355. ISSN 01446193

Levitt, R E; Kartam, N A and Kunz, J C (1988) Artificial intelligence techniques for generating construction project plans. Journal of Construction Engineering and Management, 114(3), pp. 329-343. ISSN 0733-9364

Loper, J H; Marquis, E L and Rhomberg, E J (1988) Precast prestressed long-span bridges. Journal of Construction Engineering and Management, 114(1), pp. 95-103. ISSN 0733-9364

Maloney, W F (1988) Substance abuse in construction. Journal of Construction Engineering and Management, 114(4), pp. 614-630. ISSN 0733-9364

Markus, A M (1988) A research discrepancy model for building trades training programs. PhD thesis, University of Florida, USA.

Martin, G L (1988) Training programs for engineering consulting firms. Journal of Construction Engineering and Management, 114(1), pp. 121-132. ISSN 0733-9364

McCullouch, B G (1988) Automatic identification technology applications in industrial construction. PhD thesis, Auburn University, USA.

McFillen, J M and Maloney, W F (1988) New answers and new questions in construction worker motivation. Construction Management and Economics, 6(1), pp. 35-48. ISSN 01446193

McLoud, M (1988) Craftsmen and entrepreneurs: Builders in late nineteenth-century Washington, D.C. PhD thesis, George Washington University, USA.

Miller, K S (1988) The causes of decentralization of the bargaining structure in the construction industry in the state of Ohio. PhD thesis, Ohio State University, USA.

Muehlhausen, F B (1988) Development of the materials management model for construction management curriculum development and a method to translate model information into instruction. PhD thesis, Purdue University, USA.

Musgrave, E C (1988) The building industries of eastern brittany, 1600-1790. PhD thesis, University of Oxford, UK.

Nam, C H and Tatum, C B (1988) Major characteristics of constructed products and resulting limitations of construction technology. Construction Management and Economics, 6(2), pp. 133-147. ISSN 01446193

Ndekugri, I E and McCaffer, R (1988) Management information flow in construction companies. Construction Management and Economics, 6(4), pp. 273-294. ISSN 01446193

Ofori, G (1988) Construction industry and economic growth in Singapore. Construction Management and Economics, 6(1), pp. 57-70. ISSN 01446193

Okpala, D C and Aniekwu, A N (1988) Causes of high costs of construction in Nigeria. Journal of Construction Engineering and Management, 114(2), pp. 233-244. ISSN 0733-9364

Olomolaiye, P O (1988) An evaluation of bricklayers' motivation and productivity. PhD thesis, Loughborough University, UK.

Oloufa, A A (1988) A framework for the operational simulation of construction projects. PhD thesis, University of California, Berkeley, USA.

Oussadou, A (1988) Residential satisfaction in the new urban housing projects in Algeria: a case study of Ain-Allah, Algiers. PhD thesis, University of Nottingham, UK.

O’Connor, J T and Davis, V S (1988) Constructability improvement during field operations. Journal of Construction Engineering and Management, 114(4), pp. 548-564. ISSN 0733-9364

Pain, J (1988) Design-build and the traditional approach: A comparative study with particular reference to the JCT 'with contractor's design' 1981 form of contract. PhD thesis, University of Reading, UK.

Pain, J and Bennett, J (1988) JCT with contractor's design form of contract: A study in use. Construction Management and Economics, 6(4), pp. 307-337. ISSN 01446193

Perkowski, J C (1988) Technical trends in the e and c business: The next 10 years. Journal of Construction Engineering and Management, 114(4), pp. 565-576. ISSN 0733-9364

Perng, Y-H (1988) An intelligent system approach for construction risk identification. PhD thesis, University of Texas at Austin, USA.

Pienaar, E J A (1988) A study to identify and evaluate the level of strategic management in the construction industry. DBA thesis, University of Pretoria, South Africa.

Potts, K F (1988) An alternative payment system for major 'fast track' construction projects. Construction Management and Economics, 6(1), pp. 25-33. ISSN 01446193

Prince, M W (1988) Strategic planning in construction firms: Perceptions and personal characteristics of the manager, strategic planning behaviour, and subjective performance in a large scale survey of the canadian construction industry. PhD thesis, University of Bradford, UK.

Quah, L K (1988) An evaluation of the risks in estimating and tendering for refurbishment work. PhD thesis, Heriot-Watt University, UK.

Rajagopalan, K S (1988) Supports for traveling cranes: Case history. Journal of Construction Engineering and Management, 114(1), pp. 114-120. ISSN 0733-9364

Riggs, L S (1988) Educating construction managers. Journal of Construction Engineering and Management, 114(2), pp. 279-285. ISSN 0733-9364

Ringwald, R C (1988) Applications of centrifugal pumps. Journal of Construction Engineering and Management, 114(4), pp. 659-663. ISSN 0733-9364

Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts. PhD thesis, Brunel University, UK.

Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(4), pp. 357-370. ISSN 01446193

Runeson, K G (1988) Methodology and method for price-level forecasting in the building industry. Construction Management and Economics, 6(1), pp. 49-55. ISSN 01446193

Russell, A D and Caselton, W F (1988) Extensions to linear scheduling optimization. Journal of Construction Engineering and Management, 114(1), pp. 36-52. ISSN 0733-9364

Russell, J S (1988) A knowledge-based system approach to the contractor prequalification process. PhD thesis, Purdue University, USA.

Sani, H (1988) An investigation into the influences upon and determinants of perceived quality achievement in the management of construction projects by multivariate analysis. PhD thesis, Heriot-Watt University, UK.

Sanvido, V E (1988) Conceptual construction process model. Journal of Construction Engineering and Management, 114(2), pp. 294-310. ISSN 0733-9364

Shamma, E M (1988) A dynamic model for the growth of construction firms. DSc thesis, George Washington University, USA.

Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.

Sherif, A H (1988) The choice of construction technology in developing countries: A socially conscious economic assessment approach. DArch thesis, University of Michigan, USA.

Sherman, P J (1988) Japanese construction R&D: Entrèe into U.S. Market. Journal of Construction Engineering and Management, 114(1), pp. 133-143. ISSN 0733-9364

Shtub, A (1988) The integration of CPM and material management in project management. Construction Management and Economics, 6(4), pp. 261-272. ISSN 01446193

Skibniewski, M and Hendrickson, C (1988) Analysis of robotic surface finishing work on construction site. Journal of Construction Engineering and Management, 114(1), pp. 53-68. ISSN 0733-9364

Skitmore, R M and Marsden, D E (1988) Which procurement system? Towards a universal procurement selection technique. Construction Management and Economics, 6(1), pp. 71-89. ISSN 01446193

Steiger, T L (1988) Working construction: Organization and control of the labor process. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.

Stewart, W S and Tatum, C B (1988) Segmental placement of Renton outfall: Construction innovation. Journal of Construction Engineering and Management, 114(3), pp. 390-407. ISSN 0733-9364

Sweis, R K (1988) Construction insurance in the Arab Gulf area: an analysis of cover and contracts. PhD thesis, City, University of London, UK.

Tan, W (1988) GNP, interest rate and construction investment: Empirical evidence from U.S. data. Construction Management and Economics, 6(3), pp. 185-193. ISSN 01446193

Tatum, C B (1988) Classification system for construction technology. Journal of Construction Engineering and Management, 114(3), pp. 344-363. ISSN 0733-9364

Tatum, C B and Funke, A T (1988) Partially automated grading: Construction process innovation. Journal of Construction Engineering and Management, 114(1), pp. 19-35. ISSN 0733-9364

Thomas, H R and Willenbrock, J H (1988) Managing construction research at universities. Journal of Construction Engineering and Management, 114(2), pp. 245-255. ISSN 0733-9364

Thuse, D G (1988) Road transport investment model using dynamic programming. PhD thesis, Indian Institute of Technology, Bombay, India.

Tomlinson, D P and Rhomberg, E J (1988) Contract officer in military service contracts. Journal of Construction Engineering and Management, 114(3), pp. 441-457. ISSN 0733-9364

Touran, A and Taher, K A H (1988) Optimum fleet size determination by queuing and simulation. Construction Management and Economics, 6(4), pp. 295-306. ISSN 01446193

Tucker, R L (1988) Perfection of the buggy whip. Journal of Construction Engineering and Management, 114(2), pp. 157-171. ISSN 0733-9364

Tucker, S N (1988) A single alternative formula for department of health and social security S-curves. Construction Management and Economics, 6(1), pp. 13-23. ISSN 01446193

Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.

Whiteman, W E and Irwig, H G (1988) Disturbance scheduling technique for managing renovation work. Journal of Construction Engineering and Management, 114(2), pp. 191-213. ISSN 0733-9364

Willmer, G (1988) Development of risk models for engineering construction projects. PhD thesis, University of Manchester, UK.

Wilson, O D and Sharpe, K (1988) Tenders and estimates: A probabilistic model. Construction Management and Economics, 6(3), pp. 225-245. ISSN 01446193

Young, B A (1988) Career development in construction management. PhD thesis, University of Manchester, UK.

Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.

de Leeuw, C P (1988) The pre-estimation of compensation payable in accordance with the contract price adjustment provisions of the building industry advisory council. DSc thesis, University of Pretoria, South Africa.

de Villiers, A J (1988) Procurement of rural primary schools in southern Africa: An approach to resource optimization. PhD thesis, University of Pretoria, South Africa.

This list was generated on Sat Aug 22 01:00:40 2026 UTC.