Items where Author is "Huang, R Y"

Group by: Item Type | No Grouping
Jump to: Article
Number of items: 4.

Article

Huang, R Y and Sun, K S (2006) Non-unit-based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6), pp. 585-597. ISSN 0733-9364

Huang, R Y (2006) A performance-based bridge LCCA model using visual inspection inventory data. Construction Management and Economics, 24(10), pp. 1069-1081. ISSN 1466433X

Huang, R Y and Halpin, D W (2000) Graphically based lp modelling for linear scheduling analysis: The polo system. Engineering, Construction and Architectural Management, 7(1), pp. 41-51. ISSN 0969-9988

Huang, R Y and Halpin, D W (1995) Graphical-based method for transient evaluation of construction operations. Journal of Construction Engineering and Management, 121(2), pp. 222-229. ISSN 0733-9364

This list was generated on Sat Aug 22 01:10:32 2026 UTC.