Items where Author is "Huang, R Y"
Huang, R Y and Sun, K S (2006) Non-unit-based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6), pp. 585-597. ISSN 0733-9364
Huang, R Y (2006) A performance-based bridge LCCA model using visual inspection inventory data. Construction Management and Economics, 24(10), pp. 1069-1081. ISSN 1466433X
Huang, R Y and Halpin, D W (2000) Graphically based lp modelling for linear scheduling analysis: The polo system. Engineering, Construction and Architectural Management, 7(1), pp. 41-51. ISSN 0969-9988
Huang, R Y and Halpin, D W (1995) Graphical-based method for transient evaluation of construction operations. Journal of Construction Engineering and Management, 121(2), pp. 222-229. ISSN 0733-9364
Up a level