Items where Year is 2008
A
Abanda, F H and Tah, J H M (2008) Towards developing a sustainable building technology ontology. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Abd El-Razek, M E; Bassioni, H A and Mobarak, A M (2008) Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management, 134(11), pp. 831-841. ISSN 0733-9364
Abdel-Wahab, M S (2008) An examination of the relationship between skills development and productivity in the construction industry. PhD thesis, Loughborough University, UK.
Abdel-Wahab, M S; Dainty, A R J and Ison, S G (2008) Insights into the overlap between constructionskills' footprint and other sector skills councils. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Abdel-Wahab, M S; Dainty, A R J; Ison, S G; Bowen, P and Hazlehurst, G (2008) Trends of skills and productivity in the UK construction industry. Engineering, Construction and Architectural Management, 15(4), pp. 372-382. ISSN 0969-9988
Abdelrahman, M; Zayed, T and Elyamany, A (2008) Best-value model based on project specific characteristics. Journal of Construction Engineering and Management, 134(3), pp. 179-188. ISSN 0733-9364
Abdul-Aziz, A R; Jaafar, M; Enshassi, A and Mohamed-Salleh, M N (2008) Does vocational training meet the construction industry needs in Malaysia? Feedback from ex-trainees of the basic electrical wiring course from one training institution. Journal of Engineering, Design and Technology, 6(3), pp. 258-268. ISSN 1726-0531
Abdul-Rahman, H; Yahya, I A; Berawi, M A and Wah, L W (2008) Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, 26(1), pp. 15-27. ISSN 1466433X
Abu Dabous, S (2008) A decision support methodology for rehabilitation management of concrete bridges. PhD thesis, Concordia University, Canada.
Abu Dabous, S and Alkass, S (2008) Decision support method for multi-criteria selection of bridge rehabilitation strategy. Construction Management and Economics, 26(8), pp. 883-893. ISSN 01446193
Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.
Abubaker, A E; Greenwood, D and Osborne, A (2008) A study of project planning on Libyan construction projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Acar, E; Wall, J; McNamee, F; Carney, M and Öney-Yazici, E (2008) Innovative safety management training through e-learning. Architectural Engineering and Design Management, 4(3-4), pp. 239-250. ISSN 1745-2007
Adenuga, O A (2008) Evaluation of maintenance management practice in public hospital, buildings in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.
Agdas, D (2008) Corporate-level management system for critical strategic resources for large construction program managers. PhD thesis, University of Florida, USA.
Ahadzie, D K; Proverbs, D G and Olomolaiye, P O (2008) Model for predicting the performance of project managers at the construction phase of mass house building projects. Journal of Construction Engineering and Management, 134(8), pp. 618-629. ISSN 0733-9364
Ahmad, A H (2008) Private housing development: refining rational choice. PhD thesis, University College London, UK.
Ahmad, H; An, M and Gaterell, M (2008) Km model to embed knowledge management activities into work activities in construction organisations. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ahmed, A and Gidado, K (2008) Evaluating the potential of renewable energy technologies for buildings in Nigeria. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ahmed, V; Pathmeswaran, R; Baldry, D; Worrall, L and Abouen, S (2008) An investigation into the barriers facing black and minority ethnics within the UK construction industry. Journal of Construction in Developing Countries, 13(2), pp. 83-99. ISSN 1823-6499
Aibinu, A A; Ofori, G and Ling, F Y Y (2008) Explaining cooperative behavior in building and civil engineering projects' claims process: Interactive effects of outcome favorability and procedural fairness. Journal of Construction Engineering and Management, 134(9), pp. 681-691. ISSN 0733-9364
Aibinu, A A and Pasco, T (2008) The accuracy of pre-tender building cost estimates in Australia. Construction Management and Economics, 26(12), pp. 1257-1269. ISSN 1466433X
Akkoyun, I and Dikbas, A (2008) Performance in construction: A literature review of research in construction management journals. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Aksorn, T and Hadikusumo, B H W (2008) Measuring effectiveness of safety programmes in the Thai construction industry. Construction Management and Economics, 26(4), pp. 409-421. ISSN 1466433X
Al-Ajam, M (2008) Integrating collaborative extranets with project integrated databases to improve the construction tender stage. PhD thesis, University of Salford, UK.
Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction. PhD thesis, University of Alberta, Canada.
Al-Yami, A M H (2008) An integrated approach to value management and sustainable construction during strategic briefing in Saudi construction projects. PhD thesis, Loughborough University, UK.
Allen, C and Smallwood, J (2008) Improving construction planning through 4D planning. Journal of Engineering, Design and Technology, 6(1), pp. 7-20. ISSN 1726-0531
Allen, P M (2008) The importance of complexity for the research agenda in the built environment. Architectural Engineering and Design Management, 4(1), pp. 5-14. ISSN 1745-2007
Allport, R J (2008) Improving decision-making for major urban rail projects. PhD thesis, Imperial College London, UK.
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Amponsah, I (2008) Emerging civil infrastructure and environmental sustainability: Life-cycle assessment and multiobjective optimization. PhD thesis, University of South Carolina, USA.
Anagnostou, G (2008) Quality in the apartment building industry a case study in Greece. PhD thesis, University College London, UK.
Anastassakou, M (2008) Organisational benefits using explicit project management tools, techniques and knowledge. PhD thesis, University College London, UK.
Andersen, M; Kleindienst, S; Yi, L; Lee, J; Bodart, M and Cutler, B (2008) An intuitive daylighting performance analysis and optimization approach. Building Research & Information, 36(6), pp. 593-607. ISSN 0961-3218
Andrew, A; Murning, I; Pitt, M and Tucker, M (2008) Investment in the Scottish further education estate 19992006. Journal of Financial Management of Property and Construction, 13(3), pp. 209-216. ISSN 1366-4387
Anikeeff, M A and Sriram, V (2008) Construction management strategy and developer performance. Engineering, Construction and Architectural Management, 15(6), pp. 504-513. ISSN 0969-9988
Ankrah, N A; Proverbs, D G and Ahadzie, D K (2008) Exploring the behaviours of construction project participants through social cognitive theory. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Annette, B (2008) A study on gender discrimination among construction workers and the means of empowering women construction workers with special reference to Tiruchirappalli. PhD thesis, Bharathidasan University, India.
Anumba, C J; Abdullah, A and Ruikar, K (2008) An integrated system for demolition techniques selection. Architectural Engineering and Design Management, 4(2), pp. 130-148. ISSN 1745-2007
Anumba, C J; Issa, R R A; Pan, J and Mutis, I (2008) Ontology-based information and knowledge management in construction. Construction Innovation, 8(3), pp. 218-239. ISSN 1471-4175
Anumba, C J; Pan, J; Issa, R R A and Mutis, I (2008) Collaborative project information management in a semantic web environment. Engineering, Construction and Architectural Management, 15(1), pp. 78-94. ISSN 0969-9988
Arditi, D and Pattanakitchamroon, T (2008) Analysis methods in time-based claims. Journal of Construction Engineering and Management, 134(4), pp. 242-252. ISSN 0733-9364
Ariffin, M H and Torrance, J V (2008) Social group related entry participation motivations for continuing professional development activities among malaysian registered quantity surveyors. Journal of Construction in Developing Countries, 13(2), pp. 1-19. ISSN 1823-6499
Aritua, B; Bower, D and Turner, M (2008) Managing the delivery of iconic football stadiums in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 55-60. ISSN 17514312
Aritua, B; Smith, N J and Athiyo, R (2008) Private finance for the delivery of school projects in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 141-146. ISSN 17514312
Arnold, Stuart (2008) Transforming systems engineering principles into integrated project team practice. PhD thesis, Cranfield University, UK.
Artmann, N; Gyalistras, D; Manz, H and Heiselberg, P (2008) Impact of climate warming on passive night cooling potential. Building Research & Information, 36(2), pp. 111-128. ISSN 0961-3218
Aslan, Zaki M (2008) The design of protective structures for the conservation and presentation of archaeological sites. PhD thesis, University College London, UK.
Atalah, A (2008) Effect of rock trenching vibrations on nearby structures. Journal of Construction Engineering and Management, 134(4), pp. 234-241. ISSN 0733-9364
Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.
Atkinson, G (2008) Sustainability, the capital approach and the built environment. Building Research & Information, 36(3), pp. 241-247. ISSN 0961-3218
Atkinson, J G B (2008) Market influences on low carbon energy designs in buildings. EngD thesis, University of Surrey, UK.
Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays. PhD thesis, University of South Wales, UK.
Ayodeji, A A (2008) Managing building and civil engineering project claims to reduce conflict intensity and contractors' potential to dispute. PhD thesis, National University of Singapore, Singapore.
Aziz, A M A (2008) Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects. Construction Management and Economics, 26(5), pp. 507-529. ISSN 1466433X
B
Baatz, N (2008) Problem management/dispute resolution in partnering contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 115-120. ISSN 17514312
Bachman, L R (2008) Architecture and the four encounters with complexity. Architectural Engineering and Design Management, 4(1), pp. 15-30. ISSN 1745-2007
Badenfelt, U (2008) The selection of sharing ratios in target cost contracts. Engineering, Construction and Architectural Management, 15(1), pp. 54-65. ISSN 0969-9988
Bageis, A S O (2008) Contractors' decision to bid: development of a bid/no bid strategic decision model. PhD thesis, Heriot-Watt University, UK.
Bailey, O C (2008) Least-cost energy system design for commercial buildings: The relationship between end-use energy efficiency, distributed generation, and utility energy supply. PhD thesis, Cornell University, USA.
Barr, B (2008) UK civil engineering education in the twenty-first century. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(1), pp. 17-23. ISSN 17514312
Bassioni, H A; Hassan, T M and Price, A D F (2008) Evaluation and analysis of criteria and sub-criteria of a construction excellence model. Engineering, Construction and Architectural Management, 15(1), pp. 21-41. ISSN 0969-9988
Bates, A J (2008) The owner's role in project success. PhD thesis, Polytechnic University, USA.
Battikha, M G (2008) Reasoning mechanism for construction nonconformance root-cause analysis. Journal of Construction Engineering and Management, 134(4), pp. 280-288. ISSN 0733-9364
Baxter, R J (2008) Middle range theorizing about information technology impact: A study of 3D CAD impact on construction work practices. PhD thesis, Case Western Reserve University, USA.
Bayrak, T (2008) Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge. PhD thesis, Heriot-Watt University, UK.
Beadle, K (2008) Analysis of the design process for low-energy housing. PhD thesis, De Montfort University, UK.
Beadle, K; Gibb, A; Austin, S; Fuster, A and Madden, P (2008) Adaptable futures: Sustainable aspects of adaptable buildings. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Behzadan, A H (2008) Arviscope: Georeferenced visualization of dynamic construction processes in three-dimensional outdoor augmented reality. PhD thesis, University of Michigan, USA.
Best, Eric A (2008) The development and testing of a purchasing power parity method for comparing construction costs internationally. PhD thesis, University of Technology Sydney, Australia.
Bishop, J; Bouchlaghem, D; Glass, J and Matsumoto, I (2008) Identifying and implementing management best practice for communities of practice. Architectural Engineering and Design Management, 4(3-4), pp. 160-175. ISSN 1745-2007
Bispham, J (2008) Historic imported softwood in eastern England: past knowledge, current perceptions and conservation. PhD thesis, Anglia Ruskin University, UK.
Boes, H and Dorée, A (2008) Public procurement of local authorities in the Netherlands: A case of breaking tradition for a more strategic approach? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Boonyanan, A; Robinson, H; Fong, D and Naoum, S (2008) Relationship and knowledge management among construction development project members in Thailand: The clients' perspective. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Bosche, F N (2008) Automated recognition of three-dimensional CAD model objects in dense laser range point clouds. PhD thesis, University of Waterloo, Canada.
Bourgeois, D; Reinhart, C F and Ward, G (2008) Standard daylight coefficient model for dynamic daylighting simulations. Building Research & Information, 36(1), pp. 68-82. ISSN 0961-3218
Bowden, S; Brayshaw, J; Jackson, P; Jolley, S and Richards, M (2008) Knowledge and information management for major projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(1), pp. 9-16. ISSN 17514312
Bowen, P and Cattell, K (2008) Job satisfaction of South African quantity surveyors. Engineering, Construction and Architectural Management, 15(3), pp. 260-269. ISSN 0969-9988
Bowen, P; Cattell, K; Distiller, G and Edwards, P J (2008) Job satisfaction of South African quantity surveyors: An empirical study. Construction Management and Economics, 26(7), pp. 765-780. ISSN 1466433X
Bowen, P; Cattell, K; Michell, K and Edwards, P (2008) Job satisfaction of South Africa quantity surveyors: Are employers happier than employees? Journal of Engineering, Design and Technology, 6(2), pp. 124-144. ISSN 1726-0531
Bowen, P; Dorrington, R; Distiller, G; Lake, H and Besesar, S (2008) HIV/AIDS in the South African construction industry: An empirical study. Construction Management and Economics, 26(8), pp. 827-839. ISSN 01446193
Bowes, D (2008) Identifying barriers to the establishment of dispute boards in UK construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Braimah, N (2008) An investigation into the use of construction delay and disruption analysis methodologies. PhD thesis, University of Wolverhampton, UK.
Brandao, L E T and Saraiva, E (2008) The option value of government guarantees in infrastructure projects. Construction Management and Economics, 26(11), pp. 1171-1180. ISSN 1466433X
Brewer, G (2008) Innovation and attitude: mapping the profile of ICT decision-makers in architectural, engineering and construction firms. PhD thesis, University of Newcastle, Australia.
Bridge, A J (2008) Market structures in air conditioning maintenance activity. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Briscoe, G (2008) Studies of the UK labour market with special reference to the construction sector. PhD thesis, Coventry University, UK.
Brockman, T M (2008) Personality factors influencing Bemidji State University industrial technology majors making heavy industrial construction career choices. PhD thesis, University of North Dakota, USA.
Brown, S and Walker, G (2008) Understanding heat wave vulnerability in nursing and residential homes. Building Research & Information, 36(4), pp. 363-372. ISSN 0961-3218
Bruce, R D (2008) A study of craft worker length of employment at select Missouri construction companies. PhD thesis, Indiana State University, USA.
Bryde, D J (2008) Is construction different? A comparison of perceptions of project management performance and practices by business sector and project type. Construction Management and Economics, 26(3), pp. 315-327. ISSN 1466433X
Bröchner, J and Björk, B C (2008) Where to submit? Journal choice by construction management authors. Construction Management and Economics, 26(7), pp. 739-749. ISSN 1466433X
Budayan, C (2008) Strategic group analysis: Strategic perspective, differentiation and performance in construction. PhD thesis, Middle East Technical University, Turkey.
C
Caerteling, Jasper (2008) Technology development in road construction: How government roles affect project performance. PhD thesis, University of Twente, Netherlands.
Cairns, G (2008) Advocating an ambivalent approach to theorizing the built environment. Building Research & Information, 36(3), pp. 280-289. ISSN 0961-3218
Caldas, C H; Chou, C C and O'Connor, J (2008) Negotiation-based decision support model for utility relocations in transportation infrastructure projects. Construction Management and Economics, 26(10), pp. 1079-1090. ISSN 1466433X
Cameron, I and Hare, B (2008) Planning tools for integrating health and safety in construction. Construction Management and Economics, 26(9), pp. 899-909. ISSN 1466433X
Campbell, J M (2008) Safety hazard and risk identification and management in infrastructure management. PhD thesis, University of Edinburgh, UK.
Cano-Lopez, P; Copping, A and Bullock, K (2008) Introducing an innovative approach to supporting work-based learning for specialist trade operatives. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Canter, D (2008) Do we need a metatheory of the built environment? Building Research & Information, 36(6), pp. 663-667. ISSN 0961-3218
Carmichael, D G and Balatbat, M C A (2008) The influence of extra projects on overall investment feasibility. Journal of Financial Management of Property and Construction, 13(3), pp. 161-175. ISSN 1366-4387
Carney, M; Wall, J; McNamee, F; Madden, D; Hurst, A; Vrasidas, C; Chanquoy, L; Baccino, T; Acar, E and Önwy-Yazici, E (2008) Challenges to delivering safety training through virtual classes. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Carter, D J (2008) Tubular guidance systems for daylight: UK case studies. Building Research & Information, 36(5), pp. 520-535. ISSN 0961-3218
Carthey, J; Chandra, V and Loosemore, M (2008) Assessing the adaptive capacity of hospital facilities to cope with climate-related extreme weather events: A risk management approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Cattell, D W; Bowen, P A and Kaka, A R (2008) A simplified unbalanced bidding model. Construction Management and Economics, 26(12), pp. 1283-1290. ISSN 1466433X
Caven, V (2008) Architecture: A good career for girls? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Chan, A P C; Wong, F K W; Chan, D W M; Yam, M C H; Kwok, A W K; Lam, E W M and Cheung, E (2008) Work at height fatalities in the repair, maintenance, alteration, and addition works. Journal of Construction Engineering and Management, 134(7), pp. 527-535. ISSN 0733-9364
Chan, E H W and Au, M C Y (2008) Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations. Journal of Construction Engineering and Management, 134(9), pp. 673-680. ISSN 0733-9364
Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364
Chan, Y M T (2008) The role of finance in competitiveness of indigenous contractors in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chandra, V and Loosemore, M (2008) Cultural learning during briefing: A facilities management perspective. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Chang, C H; Lin, Y C and Tserng, H P (2008) Distilling and managing engineers' experience in construction projects using a pattern approach. Construction Management and Economics, 26(3), pp. 209-223. ISSN 1466433X
Chapman, C and Ward, S (2008) Developing and implementing a balanced incentive and risk sharing contract. Construction Management and Economics, 26(6), pp. 659-669. ISSN 1466433X
Chen, C (2008) Entry mode selection for international construction markets: The influence of host country related factors. Construction Management and Economics, 26(3), pp. 303-314. ISSN 1466433X
Chen, C (2008) Risks in PPP: Process and institutional analyses. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193
Chen, L and Mohamed, S (2008) Contribution of knowledge management activities to organisational business performance. Journal of Engineering, Design and Technology, 6(3), pp. 269-285. ISSN 1726-0531
Chen, L and Mohamed, S (2008) Impact of the internal business environment on knowledge management within construction organisations. Construction Innovation, 8(1), pp. 61-81. ISSN 1471-4175
Chen, Q; Reichard, G and Beliveau, Y (2008) Multiperspective approach to exploring comprehensive cause factors for interface issues. Journal of Construction Engineering and Management, 134(6), pp. 432-441. ISSN 0733-9364
Chen, S and Jiang, Y (2008) Pavement reflective cracking control with coarse-aggregate asphalt mix interlayer. International Journal of Construction Education and Research, 4(3), pp. 200-209. ISSN 1557-8771
Chen, Y (2008) Implementing uncertainty management in Chinese construction industry. PhD thesis, University of Bristol, UK.
Chen, Y (2008) Using mobile computing for construction site information management. PhD thesis, University of Newcastle upon Tyne, UK.
Chen, Y (2008) A highway work zone design and traffic management decision system. PhD thesis, University of Wisconsin - Madison, USA.
Chen, Y and Kamara, J M (2008) Using mobile computing for construction site information management. Engineering, Construction and Architectural Management, 15(1), pp. 7-20. ISSN 0969-9988
Chen, Y; Ruikar, K and Carrillo, P M (2008) Electronic procurement benchmarking exercise in the AEC industry sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Chen, Y-T (2008) Automated on-site productivity evaluation using RFID and GPS. PhD thesis, Purdue University, USA.
Chen, Z; Li, H; Ross, A; Khalfan, M M A and Kong, S C W (2008) Knowledge-driven ANP approach to vendors evaluation for sustainable construction. Journal of Construction Engineering and Management, 134(12), pp. 928-941. ISSN 0733-9364
Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework. PhD thesis, University of Wolverhampton, UK.
Cheng, J; Proverbs, D; Oduoza, C and Potts, K (2008) Investigating the interrelationship of strategic decisions and client satisfaction: A conceptual framework. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Cheung, F K T; Wong, M W L and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(4), pp. 349-362. ISSN 1466433X
Cheung, S; Wong, P S P; Fung, A Y S and Coffey, W V (2008) Examining the use of bid information in predicting the contractor's performance. Journal of Financial Management of Property and Construction, 13(2), pp. 111-122. ISSN 1366-4387
Cheung, S O; Yiu, T W; Leung, A Y T and Chiu, O K (2008) Catastrophic transitions of construction contracting behavior. Journal of Construction Engineering and Management, 134(12), pp. 942-952. ISSN 0733-9364
Chiang, Y H; Tang, B S and Wong, F (2008) Volume building as competitive strategy. Construction Management and Economics, 26(2), pp. 161-176. ISSN 1466433X
Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X
Chin, C S and Russell, J S (2008) Predicting the expected service level and the realistic lead time of rfi process using binary logistic regression. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.
Chinda, T and Mohamed, S (2008) Structural equation model of construction safety culture. Engineering, Construction and Architectural Management, 15(2), pp. 114-131. ISSN 0969-9988
Chinda, Thanwadee (2008) A system dynamics approach to construction safety culture. PhD thesis, Griffith University, Australia.
Chinowsky, P; Diekmann, J and Galotti, V (2008) Social network model of construction. Journal of Construction Engineering and Management, 134(10), pp. 804-812. ISSN 0733-9364
Chinyio, E A and Akintoye, A (2008) Practical approaches for engaging stakeholders: Findings from the UK. Construction Management and Economics, 26(6), pp. 591-599. ISSN 1466433X
Cho, J G (2008) Open source project managment: From the integrated control perspective. PhD thesis, Claremont Graduate University, USA.
Choi, H H and Mahadevan, S (2008) Construction project risk assessment using existing database and project-specific information. Journal of Construction Engineering and Management, 134(11), pp. 894-903. ISSN 0733-9364
Choi, K (2008) Applications of ITS archived data for improved highway planning and design. PhD thesis, University of Wisconsin - Madison, USA.
Choi, K (2008) A new decision-support model for innovative contracting strategies through a quantitative analysis on aspects of project performance. PhD thesis, University of California, Berkeley, USA.
Choi, S D (2008) Postural balance and adaptations in transitioning sloped surfaces. International Journal of Construction Education and Research, 4(3), pp. 189-199. ISSN 1557-8771
Christodoulou, S E (2008) A bid-unbalancing method for lowering a contractor's financial risk. Construction Management and Economics, 26(12), pp. 1291-1302. ISSN 1466433X
Clarke, L and Gribling, M (2008) Obstacles to diversity in construction: The example of Heathrow Terminal 5. Construction Management and Economics, 26(10), pp. 1055-1065. ISSN 1466433X
Clarke, L and Janssen, J (2008) A historical context for theories underpinning the production of the built environment. Building Research & Information, 36(6), pp. 659-662. ISSN 0961-3218
Clifford-Lindkvist, C and Elmualim, A (2008) The socio-technical shaping of innovation in facilities management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Cline, R C (2008) Teaching key competencies of effective construction project managers to adults in higher education. PhD thesis, University of Idaho, USA.
Coffelt Jr., D P (2008) Roof management improvement: Improving infrastructure management decision making through a consideration of total life cycle cost and deterioration. PhD thesis, Carnegie Mellon University, USA.
Coggins, J and O’Leary, T (2008) The validity of adjudicators' determinations containing errors of law: The NSW judicial approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Cole, R J; Robinson, J; Brown, Z and O'Shea, M (2008) Re-contextualizing the notion of comfort. Building Research & Information, 36(4), pp. 323-336. ISSN 0961-3218
Cooke, T; Lingard, H; Blismas, N and Stranieri, A (2008) ToolSHeD™: The development and evaluation of a decision support tool for health and safety in construction design. Engineering, Construction and Architectural Management, 15(4), pp. 336-351. ISSN 0969-9988
Cooper, G (2008) Escaping the house: Comfort and the California garden. Building Research & Information, 36(4), pp. 373-380. ISSN 0961-3218
Cooper, L P (2008) How project teams conceive of and manage pre-quantitative risk. PhD thesis, University of Southern California, USA.
Cotgrave, A J (2008) Achieving literacy in sustainability: shifting the paradigm for construction management education. PhD thesis, Liverpool John Moores University, UK.
Cui, Q; Johnson, P; Quick, A and Hastak, M (2008) Valuing the warranty ceiling clause on New Mexico Highway 44 using a binomial lattice model. Journal of Construction Engineering and Management, 134(1), pp. 10-17. ISSN 0733-9364
D
Dabke, S; Salem, O; Genaidy, A and Daraiseh, N (2008) Job satisfaction of women in construction trades. Journal of Construction Engineering and Management, 134(3), pp. 205-216. ISSN 0733-9364
Dalton, M (2008) A risk breakdown structure for public sector construction projects. PhD thesis, University of Manchester, UK.
Damnjanovic, I; Duthie, J and Waller, S T (2008) Valuation of strategic network flexibility in development of toll road projects. Construction Management and Economics, 26(9), pp. 979-990. ISSN 1466433X
Damnjanovic, I and Zhang, Z (2008) Risk-based model for valuation of performance-specified pavement maintenance contracts. Journal of Construction Engineering and Management, 134(7), pp. 492-500. ISSN 0733-9364
Dao, M A (2008) Determinants of firm compliance with environmental laws : A case study of Vietnam. PhD thesis, National University of Singapore, Singapore.
Darby, S (2008) Energy feedback in buildings: Improving the infrastructure for demand reduction. Building Research & Information, 36(5), pp. 499-508. ISSN 0961-3218
Dawson, R; Ojiako, U and Hughes, L (2008) Assessing the impact of amended building regulations on the operations of UK construction companies. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Delmon, J J (2008) Increasing the efficiency of risk allocation in project financed infrastructure transactions by reducing the impact of risk noise. PhD thesis, King's College London, UK.
Deng, X (2008) Research on agent construction management mode and principal-agent relationship. PhD thesis, Wuhan University, China.
Dikmen, I; Birgonul, M T; Ozorhon, B and Eren, K (2008) Critical success factors for partnering in the Turkish construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ding, Z and Ng, F (2008) A new way of developing semantic differential scales with personal construct theory. Construction Management and Economics, 26(11), pp. 1213-1226. ISSN 1466433X
Doloi, H (2008) Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives. Construction Management and Economics, 26(11), pp. 1181-1196. ISSN 1466433X
Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(8), pp. 841-854. ISSN 01446193
Domingo, N; Osmani, M and Price, A D F (2008) Reducing construction waste in healthcare facilities: A project lifecycle approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Dominguez, D (2008) Handling future uncertainty: Strategic planning for the infrastructure sector. DSc thesis, ETH Zürich, Switzerland.
Donohoe, S W (2008) Can surveying and construction management undergraduate sudents' attitudes to construction law be changed by changes in teaching? DEd thesis, University of Sheffield, UK.
Dorée, A and Miller, S (2008) Is technology a new challenge for the field of construction management? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Dossick, C S and Sakagami, M (2008) Implementing web-based project management systems in the United States and Japan. Journal of Construction Engineering and Management, 134(3), pp. 189-196. ISSN 0733-9364
Doǧan, S Z; Arditi, D and Murat Günaydin, H (2008) Using decision trees for determining attribute weights in a case-based model of early cost prediction. Journal of Construction Engineering and Management, 134(2), pp. 146-152. ISSN 0733-9364
Duffy, F (2008) Linking theory back to practice. Building Research & Information, 36(6), pp. 655-658. ISSN 0961-3218
Dyas, V (2008) Constituents of performance: investigating relational contracting in a construction industry setting to establish a framework for drivers of performance. PhD thesis, Kingston University, UK.
Dzeng, R J and Wang, S S (2008) An analysis of infrastructure development based on national competitiveness perspectives. Construction Management and Economics, 26(1), pp. 47-61. ISSN 1466433X
de Blois, M and De Coninck, P (2008) The dynamics of actors' and stakeholders' participation: An approach of management by design. Architectural Engineering and Design Management, 4(3-4), pp. 176-188. ISSN 1745-2007
de Quiros, A C B; Lopez, R; Aranda-Mena, G and Edwards, P (2008) Human reliability as a source of error in research. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
de Ridder, H and Vrijhoef, R (2008) Developing a strategy for 'living buildings': Beyond cradle to cradle with living building concept. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
den Otter, A and Emmitt, S (2008) Design team communication and design task complexity: The preference for dialogues. Architectural Engineering and Design Management, 4(2), pp. 121-129. ISSN 1745-2007
E
Easa, S M and Hossain, K M A (2008) New mathematical optimization model for construction site layout. Journal of Construction Engineering and Management, 134(8), pp. 653-662. ISSN 0733-9364
Eastman, C M and Sacks, R (2008) Relative productivity in the AEC industries in the United States for on-site and off-site activities. Journal of Construction Engineering and Management, 134(7), pp. 517-526. ISSN 0733-9364
Eaton, D and Morton, P (2008) A minority report: Engaging girls in quantity surveying. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Edwards, D J and Holt, G D (2008) Construction workers' health and safety knowledge: Initial observations on some test-result data. Journal of Engineering, Design and Technology, 6(1), pp. 65-80. ISSN 1726-0531
Edwards, D J and Holt, G D (2008) Health and safety issues relating to construction excavators and their attachments. Engineering, Construction and Architectural Management, 15(4), pp. 321-335. ISSN 0969-9988
Edwards, D J and Holt, G D (2008) Protecting capital investment in plant and equipment: Case study observations of post-theft recovery. Journal of Financial Management of Property and Construction, 13(2), pp. 96-110. ISSN 1366-4387
Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2008) The impact of multiskilling on UK's construction manpower. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(1), pp. 25-30. ISSN 17514312
El Tayeh, A (2008) Social web-based systems for supporting geographically dispersed project teams in the architecture-engineering-construction industry. PhD thesis, University of Manchester, UK.
El-Gohary, N (2008) Semantic process modelling and integration for collaborative construction and infrastructure development. PhD thesis, University of Toronto, Canada.
El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.
El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175
El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling. PhD thesis, Iowa State University, USA.
Elmarsafi, G M (2008) Interorganizational collaboration: Transformation strategies to reduce construction disputes in the construction industry. PhD thesis, Capella University, USA.
Elmualim, A A (2008) Moral leadership education in construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Elmualim, A A and Govender, K (2008) Communities of practice in UK large contracting firms: Contrasting application and non-utilized merits. Architectural Engineering and Design Management, 4(3-4), pp. 149-159. ISSN 1745-2007
Endut, I R (2008) Framework for minimising time overruns of Malaysian construction projects. PhD thesis, Glasgow Caledonian University, UK.
Enshassi, A; Choudhry, R M; Mayer, P E and Shoman, Y (2008) Safety performance of subcontractors in the palestinian construction industry. Journal of Construction in Developing Countries, 13(1), pp. 51-62. ISSN 1823-6499
Enshassi, A; Rashid Abdul Aziz, A and Karriri, A (2008) Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13(1), pp. 35-47. ISSN 1366-4387
Eom, C S J; Yun, S H and Paek, J H (2008) Subcontractor evaluation and management framework for strategic partnering. Journal of Construction Engineering and Management, 134(11), pp. 842-851. ISSN 0733-9364
Erdogan, B (2008) Organisational change management for the implementation of collaboration environments. PhD thesis, Loughborough University, UK.
Ergen, E and Akinci, B (2008) Formalization of the flow of component-related information in precast concrete supply chains. Journal of Construction Engineering and Management, 134(2), pp. 112-121. ISSN 0733-9364
Eriksson, P E (2008) Procurement effects on coopetition in client-contractor relationships. Journal of Construction Engineering and Management, 134(2), pp. 103-111. ISSN 0733-9364
Eriksson, P E; Nilsson, T and Atkin, B (2008) Client perceptions of barriers to partnering. Engineering, Construction and Architectural Management, 15(6), pp. 527-539. ISSN 0969-9988
Erten, S (2008) Spatial analysis of mega-event hosting: Olympic host and Olympic bid cities. PhD thesis, Middle East Technical University, Turkey.
Eshtehardian, E; Afshar, A and Abbasnia, R (2008) Time-cost optimization: Using GA and fuzzy sets theory for uncertainties in cost. Construction Management and Economics, 26(7), pp. 679-691. ISSN 1466433X
Essa, R and Fortune, C (2008) Pre-construction evaluation practices of sustainable housing projects in the UK. Engineering, Construction and Architectural Management, 15(6), pp. 514-526. ISSN 0969-9988
Essa, R A (2008) A framework for the pre-construction evaluation of sustainable housing projects in the UK. PhD thesis, Heriot-Watt University, UK.
F
Fahdah, I (2008) Distributed IT for integration and communication of engineering information for collaborative building design. PhD thesis, University of Nottingham, UK.
Feng, L and Moodley, K (2008) Determinants of local responsiveness of fmncs in mainland China. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Fenn, J E; Hutchings, D M and Burr, K L (2008) The purposes for state residential general contractor licensing in the United States. International Journal of Construction Education and Research, 4(2), pp. 67-81. ISSN 1557-8771
Fernández-Solís, J L (2008) The systemic nature of the construction industry. Architectural Engineering and Design Management, 4(1), pp. 31-46. ISSN 1745-2007
Forbes, D; Smith, S and Horner, M (2008) Tools for selecting appropriate risk management techniques in the built environment. Construction Management and Economics, 26(11), pp. 1241-1250. ISSN 1466433X
Forbes, D R (2008) Identification and analysis of risks in the sustainability assessment of housing. PhD thesis, University of Dundee, UK.
Forbes, D R; Smith, S D and Horner, R M W (2008) A comparison of techniques for identifying risks in sustainability assessment of housing. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Forgues, D (2008) Using boundary objects to generate better value in the construction industry. PhD thesis, University of Salford, UK.
Forgues, Daniel (2008) Using boundary objects to generate better value in the construction industry: Interpreting cases from an activity theory perspective. PhD thesis, University of Salford, UK.
Forsythe, A E (2008) The lack of a clearly defined retention strategy and the impact of the retention of civil engineers. PhD thesis, Capella University, USA.
Forsythe, P (2008) Modelling customer perceived service quality in housing construction. Engineering, Construction and Architectural Management, 15(5), pp. 485-496. ISSN 0969-9988
Fraser, C and Zhu, C (2008) Stakeholder perception of construction site managers' effectiveness. Construction Management and Economics, 26(6), pp. 579-590. ISSN 1466433X
Freitas, Márcia Regina de (2008) Computacional tool for support planning and elaboration of construction site layout. PhD thesis, Universidade de São Paulo, Brazil.
Frödell, M; Josephson, P E and Lindahl, G (2008) Swedish construction clients' views on project success and measuring performance. Journal of Engineering, Design and Technology, 6(1), pp. 21-32. ISSN 1726-0531
G
Galadari, A I (2008) Evaluation of road construction alternatives: A regretful approach. PhD thesis, University of Colorado at Denver, USA.
Galasiu, A D and Reinhart, C F (2008) Current daylighting design practice: A survey. Building Research & Information, 36(2), pp. 159-174. ISSN 0961-3218
Gameson, R; Suresh, S and Chinyio, E (2008) Project debriefing: A multi-domain review of practices and procedures. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ganah, A A M; Pye, A and Hall, G (2008) The role of knowledge transfer in sustainability research in the built environment discipline. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ganguly, I (2008) Modeling alternatives and visualization of product adoption and usage in the residential construction industry. PhD thesis, University of Washington, USA.
Garcera, F C (2008) The rationale behind a small school district's decision to hire a facilities manager. EdD thesis, University of Pacific, USA.
Garriss, S (2008) Efficient, usable proof-construction strategies for distributed access-control systems. PhD thesis, Carnegie Mellon University, USA.
Gaspar, P L and De Brito, J (2008) Service life estimation of cement-rendered facades. Building Research & Information, 36(1), pp. 44-55. ISSN 0961-3218
Geminiani, F L; Smallwood, J J and van Wyk, J J (2008) The effectiveness of the occupational health and safety (OH&S) inspectorate in South African construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Georgy, M and Basily, S Y (2008) Using genetic algorithms in optimizing construction material delivery schedules. Construction Innovation, 8(1), pp. 23-45. ISSN 1471-4175
Gil, N; Beckman, S and Tommelein, I (2008) Problem-solving base building under uncertainty and ambiguity: Multiple-case study on an airport expansion program. Journal of Construction Engineering and Management, 134(12), pp. 991-1001. ISSN 0733-9364
Giritli, H and Civan, I (2008) Personality study of construction professionals in the Turkish construction industry. Journal of Construction Engineering and Management, 134(8), pp. 630-634. ISSN 0733-9364
Gkritza, K and Labi, S (2008) Estimating cost discrepancies in highway contracts: Multistep econometric approach. Journal of Construction Engineering and Management, 134(12), pp. 953-962. ISSN 0733-9364
Goedert, J D and Meadati, P (2008) Integrating construction process documentation into building information modeling. Journal of Construction Engineering and Management, 134(7), pp. 509-516. ISSN 0733-9364
Golden, S K (2008) Immigration and construction: An analysis of the impact of immigration on construction project costs. PhD thesis, University of Maryland, College Park, USA.
Gorgolewski, M (2008) Designing with reused building components: Some challenges. Building Research & Information, 36(2), pp. 175-188. ISSN 0961-3218
Gorse, C; Dickinson, I; Bown, A and Shepherd, T (2008) Developing maths skills in a virtual construction context: Benefits and challenges. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Gosling, J; Naim, M; Sassi, P; Iosif, L and Lark, R (2008) Flexible buildings for an adaptable and sustainable future. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Graham, B; Gahan, D and Thomas, K (2008) An action research approach to sharing specialist construction knowledge. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Graham, B and Thomas, K (2008) Learning from experience: Aligning continuing professional development with knowledge management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Grasso, B; Rasdorf, W and Bridgers, M (2008) Nature and extent of domestic construction program outsourcing. Journal of Construction Engineering and Management, 134(12), pp. 1002-1010. ISSN 0733-9364
Grau Torrent, D (2008) Development of a methodology for automating the identification and localization of engineered components and assessment of its impact on construction craft productivity. PhD thesis, University of Texas at Austin, USA.
Green, S D; Harty, C; Elmualim, A A; Larsen, G D and Kao, C C (2008) On the discourse of construction competitiveness. Building Research & Information, 36(5), pp. 426-435. ISSN 0961-3218
Green, S D; Larsen, G D and Kao, C C (2008) Competitive strategy revisited: Contested concepts and dynamic capabilities. Construction Management and Economics, 26(1), pp. 63-78. ISSN 1466433X
Green, S D and Schweber, L (2008) Theorizing in the context of professional practice: The case for middle-range theories. Building Research & Information, 36(6), pp. 649-654. ISSN 0961-3218
Greenwood, D; Horne, M; Thompson, E M; Allwood, C M; Wernemyr, C and Westerdahl, B (2008) Strategic perspectives on the use of virtual reality within the building industries of four countries. Architectural Engineering and Design Management, 4(2), pp. 85-98. ISSN 1745-2007
Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Griffin, M G (2008) The lived experience of first line managers during planned organizational change: A phenomenological study of one firm in the residential construction industry. EdD thesis, George Washington University, USA.
Griffith, A and Bhutto, K (2008) Contractors' experiences of integrated management systems. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 93-98. ISSN 17514312
Gruneberg, S (2008) Modelling the UK built infrastructure market using gross fixed capital formation. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Guan, Z; Millard, S and Yang, Z (2008) CDIO and the Liverpool Constructionarium. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 77-83. ISSN 17514312
Gunderson, D E and Moore, J D (2008) Group learning pedagogy and group selection. International Journal of Construction Education and Research, 4(1), pp. 34-45. ISSN 1557-8771
Gunning, J G (2008) Towards a more playful approach to construction management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Guo, X (2008) Pricing and financing roads in transportation networks. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
H
Haga, Heitor Cesar Riogi (2008) Production and sales sectors of materials in the house construction production chain: Diagnosis for the development of technological foresight studies. PhD thesis, Universidade de São Paulo, Brazil.
Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.
Hamoda, M F (2008) Modeling of construction noise for environmental impact assessment. Journal of Construction in Developing Countries, 13(1), pp. 79-89. ISSN 1823-6499
Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364
Harris, H J (2008) Conquering winter: US consumers and the cast-iron stove. Building Research & Information, 36(4), pp. 337-350. ISSN 0961-3218
Harrison, S and Farrell, P (2008) Measuring post-merger success: Integration processes and human factors. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Harryson, P (2008) Industrial bridge engineering: structural developments for more efficient bridge construction. PhD thesis, Chalmers University of Technology, Sweden.
Hartmann, A; Reymen, I M M J and Van Oosterom, G (2008) Factors constituting the innovation adoption environment of public clients. Building Research & Information, 36(5), pp. 436-449. ISSN 0961-3218
Hartmann, A D A M L (2008) A role-play approach for teaching research methodology in construction management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Hartmann, T (2008) A grassroots model of decision support system implementations by construction project teams. PhD thesis, Stanford University, USA.
Hartmann, T; Gao, J and Fischer, M (2008) Areas of application for 3D and 4D models on construction projects. Journal of Construction Engineering and Management, 134(10), pp. 776-785. ISSN 0733-9364
Harty, C (2008) Implementing innovation in construction: Contexts, relative boundedness and actor-network theory. Construction Management and Economics, 26(10), pp. 1029-1041. ISSN 1466433X
Harty, C (2008) Sociology and construction management research: Issues, approaches and implications. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175
Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364
Hassanein, A A G and El Nemr, W (2008) Claims management in the Egyptian industrial construction sector: A contractor's perspective. Engineering, Construction and Architectural Management, 15(3), pp. 246-259. ISSN 0969-9988
Hassanein, A A G and Hanna, R S (2008) Safety performance in the Egyptian construction industry. Journal of Construction Engineering and Management, 134(6), pp. 451-455. ISSN 0733-9364
Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2008) Analysis of techniques leading to radical reduction in project cycle time. Journal of Construction Engineering and Management, 134(12), pp. 915-927. ISSN 0733-9364
Hatmoko, J U D (2008) The impact of supply chain management practice on construction project performance. PhD thesis, University of Newcastle upon Tyne, UK.
Healy, S (2008) Air-conditioning and the 'homogenization' of people and built environments. Building Research & Information, 36(4), pp. 312-322. ISSN 0961-3218
Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364
Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364
Hein, M F and Houck, K D (2008) Construction challenges of adaptive reuse of historical buildings in Europe. International Journal of Construction Education and Research, 4(2), pp. 115-131. ISSN 1557-8771
Henjewele, C; Sun, M and Fewings, P (2008) Uncertainties and the challenge of long-term value for money in the delivery of PFI projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Hill, C (2008) The use of computer mediated communication in construction project communication. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Hillier, B (2008) Space and spatiality: What the built environment needs from social theory. Building Research & Information, 36(3), pp. 216-230. ISSN 0961-3218
Hlaing, N N; Singh, D; Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(2), pp. 85-95. ISSN 1366-4387
Ho, D C W; Chau, K W and Yau, Y (2008) Evaluating unauthorized appendages in private apartment buildings. Building Research & Information, 36(6), pp. 568-579. ISSN 0961-3218
Hoezen, M and Doree, A (2008) First Dutch competitive dialogue projects: A procurement route caught between competition and collaboration. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Hu, J; Ren, Z and Shen, L Y (2008) Impacts of overseas management structures on project buyout management: Case studies of Chinese international contractors. Journal of Construction Engineering and Management, 134(11), pp. 864-875. ISSN 0733-9364
Hua, G B (2008) The state of applications of quantitative analysis techniques to construction economics and management (1983 to 2006). Construction Management and Economics, 26(5), pp. 485-497. ISSN 1466433X
Huang, Y (2008) Analysis of the supply chain design and planning issues: Models and algorithms. PhD thesis, National University of Singapore, Singapore.
Huang, Y L (2008) The pricing of conditional performance guarantees with risky collateral. Construction Management and Economics, 26(9), pp. 967-978. ISSN 1466433X
Hui, E C M and Ivan, I M H (2008) A risk-based option pricing strategy for property valuation: An empirical study in Hong Kong. Journal of Financial Management of Property and Construction, 13(1), pp. 48-59. ISSN 1366-4387
Hui, K J (2008) Court decisions on building contract disputes: a Coasian empirical analysis. PhD thesis, University of Hong Kong, Hong Kong.
Hwang, B G; Thomas, S R; Degezelle, D and Caldas, C H (2008) Development of a benchmarking framework for pharmaceutical capital projects. Construction Management and Economics, 26(2), pp. 177-195. ISSN 1466433X
Hyun, C; Cho, K; Koo, K; Hong, T and Moon, H (2008) Effect of delivery methods on design performance in multifamily housing projects. Journal of Construction Engineering and Management, 134(7), pp. 468-482. ISSN 0733-9364
Höök, M and Stehn, L (2008) Applicability of lean principles and practices in industrialized housing production. Construction Management and Economics, 26(10), pp. 1091-1100. ISSN 1466433X
I
Ibrahim, A D; Price, A D F and Dainty, A R J (2008) Is the local improvement finance trust (LIFT) procurement initiative delivering the expected economies of scale? Results from three case studies. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ibrahim, Y M (2008) Developing a model for vision-based progress measurement and visualisation of as-built construction operations. PhD thesis, Heriot-Watt University, UK.
Ibrahim, Y M; Kaka, A P; Aouad, G and Kagioglou, M (2008) As-built documentation of construction sequence by integrating virtual reality with time-lapse movies. Architectural Engineering and Design Management, 4(2), pp. 73-84. ISSN 1745-2007
Ikpe, E; Hammond, F and Proverbs, D (2008) Cost-benefit analysis (CBA) of construction health and safety management: A theoretical discussion. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ilozor, B B (2008) Architectural and building features disparity and preservation of structural and fabrics integrity. Journal of Engineering, Design and Technology, 6(1), pp. 33-47. ISSN 1726-0531
Ilter, D and Dikbas, A (2008) The use of key attrıbutes ın alternatıve dıspute resolutıon (ADR) process desıgn. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Imriyas, K; Low, S P; Teo, A L and Chan, S L (2008) Premium-rating model for workers' compensation insurance in construction. Journal of Construction Engineering and Management, 134(8), pp. 601-617. ISSN 0733-9364
Ingirige, B; Haigh, R; Malalgoda, C and Palliyaguru, R (2008) Exploring good practice knowledge transfer related to post-tsunami housing (re-)construction in Sri Lanka. Journal of Construction in Developing Countries, 13(2), pp. 21-42. ISSN 1823-6499
Isaac, S and Navon, R (2008) Feasibility study of an automated tool for identifying the implications of changes in construction projects. Journal of Construction Engineering and Management, 134(2), pp. 139-145. ISSN 0733-9364
Issa, R R A and Haddad, J (2008) Perceptions of the impacts of organizational culture and information technology on knowledge sharing in construction. Construction Innovation, 8(3), pp. 182-201. ISSN 1471-4175
J
Jaillon, L and Poon, C S (2008) Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study. Construction Management and Economics, 26(9), pp. 953-966. ISSN 1466433X
Jallow, A K; Demian, P; Baldwin, A and Anumba, C (2008) Life cycle approach to requirements information management in construction projects: State-of-the-art and future trends. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Jang, J (2008) Improving the make-ready process and forecasting project performance using performance of the make-ready process. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Jansson, G; Söderholm, E and Johnsson, H (2008) Design process organisation at industrial house builders: A case study of two timber housing companies in Sweden. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Jensen, J O and Gram-Hanssen, K (2008) Ecological modernization of sustainable buildings: A Danish perspective. Building Research & Information, 36(2), pp. 146-158. ISSN 0961-3218
Jha, K N and Devaya, M N (2008) Modelling the risks faced by Indian construction companies assessing international projects. Construction Management and Economics, 26(4), pp. 337-348. ISSN 1466433X
Jin, X H and Doloi, H (2008) Interpreting risk allocation mechanism in public-private partnership projects: An empirical study in a transaction cost economics perspective. Construction Management and Economics, 26(7), pp. 707-721. ISSN 1466433X
Johnsson, H and Sardén, Y (2008) Industrialised timber housing: From trial to production. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Jones, J W (2008) Wayfinding: A grounded theory study of the information-seeking behavior of constructors. DEd thesis, Ball State University, USA.
Joseph, A and Hamilton, D K (2008) The Pebble Projects: Coordinated evidence-based case studies. Building Research & Information, 36(2), pp. 129-145. ISSN 0961-3218
Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.
Jørgensen, B and Emmitt, S (2008) Lost in transition: The transfer of lean manufacturing to construction. Engineering, Construction and Architectural Management, 15(4), pp. 383-398. ISSN 0969-9988
Jørgensen, T H; Forman, M; Storgaard, K and Laustsen, S (2008) New concepts of collaboration in construction: Could they lead to health and safety improvements? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
K
Kaka, A; Wong, C; Fortune, C and Langford, D (2008) Culture change through the use of appropriate pricing systems. Engineering, Construction and Architectural Management, 15(1), pp. 66-77. ISSN 0969-9988
Kalowski, J (2008) Community consultation: Lessons from Sydney. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 65-69. ISSN 17514312
Kang, Y; O'Brien, W J; Thomas, S and Chapman, R E (2008) Impact of information technologies on performance: Cross study comparison. Journal of Construction Engineering and Management, 134(11), pp. 852-863. ISSN 0733-9364
Karami, S (2008) Using by-product industrial materials to replace all cement in construction products. PhD thesis, Coventry University, UK.
Karlsson, M; Lakka, A; Sulankivi, K; Hanna, A S and Thompson, B P (2008) Best practices for integrating the concurrent engineering environment into multipartner project management. Journal of Construction Engineering and Management, 134(4), pp. 289-299. ISSN 0733-9364
Karvekar, S P (2008) Private sector participation in roads development: Planning and management issues. PhD thesis, Maharaja Sayajirao University of Baroda, India.
Kasim, N B (2008) Improving materials management on construction projects. PhD thesis, Loughborough University, UK.
Kataoka, M (2008) Automated generation of construction plans from primitive geometries. Journal of Construction Engineering and Management, 134(8), pp. 592-600. ISSN 0733-9364
Kayaga, S (2008) Public-private delivery of urban water services in Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 147-155. ISSN 17514312
Kestle, L; Storey, B and Potangaroa, R (2008) Towards the validation of a conceptual design management model for remote site projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ketter, Jeremy Kevin (2008) The utilization of consultant construction management and construction inspection services by state departments of transportation. PhD thesis, University of Pittsburgh, USA.
Khadour, L and Darkwa, J (2008) Tqem in the UK construction industry: Some key findings from a survey. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Khalafallah, A and El-Rayes, K (2008) Minimizing construction-related security risks during airport expansion projects. Journal of Construction Engineering and Management, 134(1), pp. 40-48. ISSN 0733-9364
Kheni, N A (2008) Impact of health and safety management on safety performance of small and medium-sized construction businesses in Ghana. PhD thesis, Loughborough University, UK.
Kheni, N A; Dainty, A R J and Gibb, A (2008) Health and safety management in developing countries: A study of construction SMEs in Ghana. Construction Management and Economics, 26(11), pp. 1159-1169. ISSN 1466433X
Kilby, A and McCabe, S (2008) Human resource management (HRM) in construction: An exploration of issues and practice. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364
Kim, J L and Ellis Jr, R D (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling. Journal of Construction Engineering and Management, 134(11), pp. 904-913. ISSN 0733-9364
Kim, S (2008) Development of a wireless real-time productivity measurement system for rapid construction operations. PhD thesis, University of Kansas, USA.
King, A P (2008) Enhancing the effectiveness of design and build tendering. PhD thesis, Sheffield Hallam University, UK.
Kishk, M a U C (2008) The impact of effective risk management on project success. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates. PhD thesis, Carnegie Mellon University, USA.
Kleiner, B M; Smith-Jackson, T L; Mills, T H; O'Brien, M and Haro, E (2008) Design, development, and deployment of a rapid universal safety and health system for construction. Journal of Construction Engineering and Management, 134(4), pp. 273-279. ISSN 0733-9364
Klotz, L (2008) Process transparency for sustainable building delivery. PhD thesis, Pennsylvania State University, USA.
Knight, T and Boyd, D (2008) An investigation into how property developers use their social networks to drive development. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Kofoworola, O F and Gheewala, S (2008) An input-output analysis of Thailand's construction sector. Construction Management and Economics, 26(11), pp. 1227-1240. ISSN 1466433X
Kong, D; Tiong, R L K; Cheah, C Y J; Permana, A and Ehrlich, M (2008) Assessment of credit risk in project finance. Journal of Construction Engineering and Management, 134(11), pp. 876-884. ISSN 0733-9364
Koo, D H and Ariaratnam, S T (2008) Application of a sustainability model for assessing water main replacement options. Journal of Construction Engineering and Management, 134(8), pp. 563-574. ISSN 0733-9364
Koutsikouri, D; Austin, S and Dainty, A (2008) Critical success factors in collaborative multi-disciplinary design projects. Journal of Engineering, Design and Technology, 6(3), pp. 198-226. ISSN 1726-0531
Koutsikouri, D; Austin, S and Dainty, A (2008) Critical success factors in collaborative multidisciplinary design projects. Journal of Engineering, Design and Technology, 6(3), pp. 198-226. ISSN 1726-0531
Kramer, S W (2008) Does prior project management work experience have an effect on the academic achievement of university students in the classroom? International Journal of Construction Education and Research, 4(1), pp. 18-33. ISSN 1557-8771
Kulatunga, K J (2008) Construction client and innovation: effect of client characteristics. PhD thesis, University of Salford, UK.
Kulatunga, U (2008) Influence of performance measurement towards construction research and development. PhD thesis, University of Salford, UK.
Kululanga, G K and Kuotcha, W S (2008) Measuring organisational learning through project reviews. Engineering, Construction and Architectural Management, 15(6), pp. 580-595. ISSN 0969-9988
Kwawu, W E K and Hughes, W P (2008) Strategies for aligning organizational incentive systems through contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
L
Laefer, D F and Manke, J P (2008) Building reuse assessment for sustainable urban reconstruction. Journal of Construction Engineering and Management, 134(3), pp. 217-227. ISSN 0733-9364
Lai, L W C; Ng, F W N and Yung, P (2008) The Coase theorem and a Coasian construction economics and management research agenda. Construction Management and Economics, 26(1), pp. 29-46. ISSN 1466433X
Lam, E W M; Chan, A P C and Chan, D W M (2008) Determinants of successful design-build projects. Journal of Construction Engineering and Management, 134(5), pp. 333-341. ISSN 0733-9364
Lam, K C; Lam, M C K and Wang, D (2008) MBNQA-oriented self-assessment quality management system for contractors: Fuzzy AHP approach. Construction Management and Economics, 26(5), pp. 447-461. ISSN 1466433X
Lam, K C; Wang, D and Lam, M C K (2008) Practices of Hong Kong building contractors in strategic asset allocation process: Longitudinal approach. Journal of Financial Management of Property and Construction, 13(3), pp. 176-186. ISSN 1366-4387
Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: An analysis of 30 Melbourne case studies. Construction Management and Economics, 26(2), pp. 147-160. ISSN 1466433X
Laryea, S and Hughes, W (2008) How contractors price risk in bids: Theory and practice. Construction Management and Economics, 26(9), pp. 911-924. ISSN 1466433X
Laryea, S A (2008) How contractors take account of risk in the tender process: Theory and practice. PhD thesis, University of Reading, UK.
Lee, C and Moudon, A V (2008) Neighbourhood design and physical activity. Building Research & Information, 36(5), pp. 395-411. ISSN 0961-3218
Lee, J (2008) Dynamic project management methodology: Managing schedule compression. PhD thesis, University of Florida, USA.
Leino, J L (2008) Community and private sector approaches to development in Kenya. PhD thesis, University of California, Berkeley, USA.
Leiringer, R and Cardellino, P (2008) Tales of the expected: Investigating the rhetorical strategies of innovation champions. Construction Management and Economics, 26(10), pp. 1043-1054. ISSN 1466433X
Leu, S S and Lin, Y C (2008) Project performance evaluation based on statistical process control techniques. Journal of Construction Engineering and Management, 134(10), pp. 813-819. ISSN 0733-9364
Leung, M Y; Chan, Y S; Chong, A and Sham, J F C (2008) Developing structural integrated stressor-stress models for clients' and contractors' cost engineers. Journal of Construction Engineering and Management, 134(8), pp. 635-643. ISSN 0733-9364
Leung, M Y; Chan, Y S and Olomolaiye, P (2008) Impact of stress on the performance of construction project managers. Journal of Construction Engineering and Management, 134(8), pp. 644-652. ISSN 0733-9364
Leung, M Y; Chen, D and Yu, J (2008) Demystifying moderate variables of the interrelationships among affective commitment, job performance, and job satisfaction of construction professionals. Journal of Construction Engineering and Management, 134(12), pp. 963-971. ISSN 0733-9364
Leung, M Y; Zhang, H and Skitmore, M (2008) Effects of organizational supports on the stress of construction estimation participants. Journal of Construction Engineering and Management, 134(2), pp. 84-93. ISSN 0733-9364
Li, B (2008) Domestic private finance project development in China. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.
Li, H; Guo, H; Skibniewski, M J and Skitmore, M (2008) Using the IKEA model and virtual prototyping technology to improve construction process management. Construction Management and Economics, 26(9), pp. 991-1000. ISSN 1466433X
Li, J and Zou, P X W (2008) Risk identification and assessment in PPP infrastructure projects using fuzzy analytical hierarchy process and life-cycle methodology. Construction Economics and Building, 8(1), pp. 34-48. ISSN 2204-9029
Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.
Li, Y I H; Fellows, R F and Liu, A M M (2008) Directional interaction of organizational culture and structure through information processing theory. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Li Hao, J; Hill, M J and Yin Shen, L (2008) Managing construction waste on-site through system dynamics modelling: The case of Hong Kong. Engineering, Construction and Architectural Management, 15(2), pp. 103-113. ISSN 0969-9988
Liao, P-C (2008) Influence factors of engineering productivity and their impact on project performance. PhD thesis, University of Texas at Austin, USA.
Limsila, K and Ogunlana, S O (2008) Linking personal competencies with transformational leadership style evidence from the construction industry in Thailand. Journal of Construction in Developing Countries, 13(1), pp. 27-50. ISSN 1823-6499
Lin, Y H; Lee, P C and Chang, T P (2008) Integrating grey number and minkowski distance function into grey relational analysis technique to improve the decision quality under uncertain information. Construction Management and Economics, 26(2), pp. 115-123. ISSN 1466433X
Lindebaum, D (2008) Trait emotional intelligence, transformational leadership and performance in the UK construction industry. PhD thesis, University of Manchester, UK.
Lindelöf, D and Morel, N (2008) Bayesian estimation of visual discomfort. Building Research & Information, 36(1), pp. 83-96. ISSN 0961-3218
Ling, F Y Y and Chan, A H M (2008) Internationalizing quantity surveying services. Engineering, Construction and Architectural Management, 15(5), pp. 440-455. ISSN 0969-9988
Ling, F Y Y and Leow, L (2008) Enabling knowledge flow: Retaining graduate women in the Singapore construction industry. Journal of Construction in Developing Countries, 13(2), pp. 65-82. ISSN 1823-6499
Ling, F Y Y; Low, S P; Wang, S and Egbelakin, T (2008) Models for predicting project performance in China using project management practices adopted by foreign AEC firms. Journal of Construction Engineering and Management, 134(12), pp. 983-990. ISSN 0733-9364
Lingard, H and Francis, V (2008) An exploration of the adaptive strategies of working families in the Australian construction industry. Engineering, Construction and Architectural Management, 15(6), pp. 562-579. ISSN 0969-9988
Lingard, H C; Townsend, K; Bradley, L and Brown, K (2008) Alternative work schedule interventions in the Australian construction industry: A comparative case study analysis. Construction Management and Economics, 26(10), pp. 1101-1112. ISSN 1466433X
Liou, F M and Huang, C P (2008) Automated approach to negotiations of BOT contracts with the consideration of project risk. Journal of Construction Engineering and Management, 134(1), pp. 18-24. ISSN 0733-9364
Liu, A M M and Fellows, R (2008) Behaviour of quantity surveyors as organizational citizens. Construction Management and Economics, 26(12), pp. 1271-1282. ISSN 1466433X
Liu, W (2008) Systems theory based method for construction project planning. PhD thesis, University of Florida, USA.
Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(2), pp. 103-113. ISSN 1466433X
Lobo, Y B and Wilkinson, S (2008) New approaches to solving the skills shortages in the New Zealand construction industry. Engineering, Construction and Architectural Management, 15(1), pp. 42-53. ISSN 0969-9988
Lockwood, T A (2008) A new market risk model for cogeneration project financing—combined heat and power development without a power purchase agreement. PhD thesis, Walden University, USA.
London, K; Singh, V; Taylor, C; Gu, N and Brankovic, L (2008) Building information modelling project decision support framework. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Loosemore, M and Galea, N (2008) Genderlect and conflict in the Australian construction industry. Construction Management and Economics, 26(2), pp. 125-135. ISSN 1466433X
Lou, E C W and Goulding, J S (2008) Building and construction classification systems. Architectural Engineering and Design Management, 4(3-4), pp. 206-220. ISSN 1745-2007
Love, P E D; Davis, P; Kerry London, K and Jasper, T (2008) Causal modelling of construction disputes. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Love, P E D; Davis, P R; Lopez, R and Jasper, T (2008) It’s not just about bricks and mortar: Procedural failures in construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Lowry, M B (2008) An online analytic-deliberative approach to public participation for transportation investment decisions. PhD thesis, University of Washington, USA.
Lozon, J P (2008) Evaluating value improving practices for large scale projects. PhD thesis, University of Calgary, Canada.
Lu, M and Lam, H C (2008) Critical path scheduling under resource calendar constraints. Journal of Construction Engineering and Management, 134(1), pp. 25-31. ISSN 0733-9364
Lu, N and Liska, R W (2008) Designers' and general contractors' perceptions of offsite construction techniques in the united state construction industry. International Journal of Construction Education and Research, 4(3), pp. 177-188. ISSN 1557-8771
Lu, S L; Sexton, M G; Abbott, C and Jones, V (2008) Senior female managers in small construction firms within the North West of England: An update. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Lu, W; Shen, L and Yam, M C H (2008) Critical success factors for competitiveness of contractors: China study. Journal of Construction Engineering and Management, 134(12), pp. 972-982. ISSN 0733-9364
Lucko, G (2008) Productivity scheduling method compared to linear and repetitive project scheduling methods. Journal of Construction Engineering and Management, 134(9), pp. 711-720. ISSN 0733-9364
Lueth, P L O (2008) The architectural design studio as a learning environment: A qualitative exploration of architecture design student learning experiences in design studios from first- through fourth-year. PhD thesis, Iowa State University, USA.
Luo, Y (2008) Decision support for prefabrication strategy selection on building systems. PhD thesis, Pennsylvania State University, USA.
Luo, Y (2008) Radical architecture, collective mindfulness, and information technology: A dialectical analysis of risk control in complex socio-technical systems. PhD thesis, Case Western Reserve University, USA.
Lurie, J (2008) On-demand performance bonds: Reducing the risk of abuse. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 121-125. ISSN 17514312
Luu, T V; Kim, S Y; Cao, H L and Park, Y M (2008) Performance measurement of construction firms in developing countries. Construction Management and Economics, 26(4), pp. 373-386. ISSN 1466433X
Löfgren, A (2008) Making mobile meaning: Expectations and experiences of mobile computing usefulness in construction site management practice. PhD thesis, KTH Royal Institute of Technology, Sweden.
M
Madunic, M (2008) Choosing a project team: The effects of interdependence and prior transacting in engineering, procurement and construction (EPC) projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Maguire, K J P (2008) Risk, culture, and organization: a study of injury among construction workers. PhD thesis, University of Salford, UK.
Mahapatra, K and Gustavsson, L (2008) Multi-storey timber buildings: Breaking industry path dependency. Building Research & Information, 36(6), pp. 638-648. ISSN 0961-3218
Mahmood, W Y W and Mohammed, A H (2008) A conceptual framework for the development of quality culture in the construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Mak, M Y and Ng, S T (2008) Feng shui: An alternative framework for complexity in design. Architectural Engineering and Design Management, 4(1), pp. 58-72. ISSN 1745-2007
Mak, S W K; Choy, L H T and ho, W K O (2008) Hedonic models, internet-based technologies, and the provision of online property appraisal. Construction Innovation, 8(2), pp. 92-105. ISSN 1471-4175
Malmqvist, T (2008) Environmental rating methods: Selecting indoor environmental quality (IEQ) aspects and indicators. Building Research & Information, 36(5), pp. 466-485. ISSN 0961-3218
Manase, D (2008) An exploratory study of GIS based analysis of health and safety related information. PhD thesis, University of Wolverhampton, UK.
Manley, K (2008) Implementation of innovation by manufacturers subcontracting to construction projects. Engineering, Construction and Architectural Management, 15(3), pp. 230-245. ISSN 0969-9988
Manley, S and de Graft-Johnson, A (2008) Women in architecture: Five years on. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Mann, P; Aczel, J; Scanlon, E and Cooper, M (2008) Supporting computer-supported collaborative work (CSCW) in conceptual design. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Mansfield, J R (2008) The ethics of conservation: Some dilemmas in cultural built heritage projects in England. Engineering, Construction and Architectural Management, 15(3), pp. 270-281. ISSN 0969-9988
Manthe, M F and Smallwood, J J (2008) An overview of the appropriateness of tertiary built environment education in South Africa. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Mao, X (2008) The framework of TRIZ-enhanced-value engineering analysis and its knowledge management. PhD thesis, University of Alberta, Canada.
Mao, X and Zhang, X (2008) Construction process reengineering by integrating lean principles and computer simulation techniques. Journal of Construction Engineering and Management, 134(5), pp. 371-381. ISSN 0733-9364
Marnewick, C (2008) Ensuring succesful erp implementations using the vision-to-project framework. PhD thesis, University of Johannesburg, South Africa.
Marshall, J J (2008) City Inn v. Shepherd: A matter of judgement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 71-75. ISSN 17514312
Martin, L and Root, D (2008) Empowerment in South Africa and the educational aspect of the basho. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Marzouk, M (2008) A superiority and inferiority ranking model for contractor selection. Construction Innovation, 8(4), pp. 250-268. ISSN 1471-4175
Masterson, J (2008) Employer perspective of the new Irish public works contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 99-105. ISSN 17514312
Matar, M M; Georgy, M E and Ibrahim, M E (2008) Sustainable construction management: Introduction of the operational context space (OCS). Construction Management and Economics, 26(3), pp. 261-275. ISSN 1466433X
Mathur, V N; Price, A D F and Austin, S (2008) Conceptualizing stakeholder engagement in the context of sustainability and its assessment. Construction Management and Economics, 26(6), pp. 601-609. ISSN 1466433X
Matipa, W M (2008) Total cost management at the design stage using a building product model. PhD thesis, University College Cork, Ireland.
Matipa, W M; Kelliher, D and Keane, M (2008) How a quantity surveyor can ease cost management at the design stage using a building product model. Construction Innovation, 8(3), pp. 164-181. ISSN 1471-4175
Mañelele, I and Muya, M (2008) Risk identification on community-based construction projects in Zambia. Journal of Engineering, Design and Technology, 6(2), pp. 145-161. ISSN 1726-0531
Mbachu, J (2008) Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26(5), pp. 471-484. ISSN 1466433X
Mbiti, Titus (2008) System dynamics model of construction output in Kenya. PhD thesis, RMIT University, Australia.
McCoy, A P (2008) Commercialization for innovative products in the residential construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.
McCoy, A P; Thabet, W and Badinelli, R (2008) Towards establishing a domain specific commercialization model for innovation in residential construction. Construction Innovation, 8(2), pp. 137-155. ISSN 1471-4175
McGilligan, C; Wilde, P and Goodhew, S (2008) An assessment of the potential returns of energy certificates for the UK household sector. Journal of Financial Management of Property and Construction, 13(3), pp. 187-199. ISSN 1366-4387
Mega, T (2008) Implications of quality management in the Greek construction industry. PhD thesis, University College London, UK.
Mehmet, O and Yorucu, V (2008) Explosive construction in a micro-state: Environmental limit and the Bon curve: Evidence from North Cyprus. Construction Management and Economics, 26(1), pp. 79-88. ISSN 1466433X
Meiling, J and Johnsson, H (2008) Feedback in industrialised housing: Why does it not happen? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Menches, C L; Hanna, A S; Nordheim, E V and Russell, J S (2008) Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(8), pp. 855-869. ISSN 01446193
Meng, X (2008) Development of assessment framework for construction supply chain relationships. PhD thesis, University of the West of England, Bristol, UK.
Mer'Eb, M M (2008) GREENOMETER-7: A tool to assess the sustainability of a building's life cycle at the conceptual design phase. DEng thesis, Cleveland State University, USA.
Mihindu, S; Khosrowshahi, F and Egbu, C (2008) Knowledge collaboration environment for supporting scientific communities: Implications to the construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Mikhailitchenko, Serguei (2008) The Australian housing market: Price dynamics and capital stock growth. PhD thesis, Griffith University, Australia.
Miller, S and Dorée, A (2008) Improving logistics in the asphalt paving process: What can we learn from the planner's logic? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Mills, G; Austin, S and Price, A (2008) Values driven policy in designing environments for children and young people’s education, health and wellbeing. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Minchin, R E; Hammons, M I and Ahn, J (2008) A construction quality index for highway construction. Construction Management and Economics, 26(12), pp. 1313-1324. ISSN 1466433X
Moehler, R C; Chan, P W and Greenwood, D (2008) The interorganisational influences on construction skills development in the UK. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Moffatt, S and Kohler, N (2008) Conceptualizing the built environment as a social-ecological system. Building Research & Information, 36(3), pp. 248-268. ISSN 0961-3218
Moodley, K; Smith, N and Preece, C N (2008) Stakeholder matrix for ethical relationships in the construction industry. Construction Management and Economics, 26(6), pp. 625-632. ISSN 1466433X
Moon, H J and Augenbroe, G (2008) Empowerment of decision-makers in mould remediation. Building Research & Information, 36(5), pp. 486-498. ISSN 0961-3218
Moore, J D and Plugge, P W (2008) Perceptions and expectations: Implications for construction management internships. International Journal of Construction Education and Research, 4(2), pp. 82-96. ISSN 1557-8771
Morgan, A; Finniear, J; Raidén, A B and Murphy, M (2008) Developing trust among migrant workers: Methodological concerns of establishing trust among research participants. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Moses, S (2008) Improving interoperability of AEC collaborative software through the creation of data exchange standards. PhD thesis, Loughborough University, UK.
Motawa, I and Kaka, A (2008) Payment mechanisms for integrated teams in construction. Construction Economics and Building, 8(2), pp. 1-10. ISSN 2204-9029
Motawa, I; Kaka, A and Hong Wong, C (2008) Development of transparent payment systems. Journal of Financial Management of Property and Construction, 13(2), pp. 143-156. ISSN 1366-4387
Mugabi, J and Marin, P (2008) PPP in urban water: Lessons from Yerevan, Armenia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 171-178. ISSN 17514312
Mulu, T and Smith, N J (2008) Innovative road infrastructure financing in Jamaica and the developing countries. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Murphy, M E; Perera, R S and Heaney, S G (2008) Building design innovation: Expansion of classification linkages through case study analysis. Journal of Engineering, Design and Technology, 6(2), pp. 99-111. ISSN 1726-0531
Musonda, I and Smallwood, J (2008) Health and safety (H&S) awareness and implementation in botswana's construction industry. Journal of Engineering, Design and Technology, 6(1), pp. 81-90. ISSN 1726-0531
Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.
N
Naderpajouh, N and Afshar, A (2008) A case-based reasoning approach to application of value engineering methodology in the construction industry. Construction Management and Economics, 26(4), pp. 363-372. ISSN 1466433X
Nakano, V M (2008) A design assessment system to protect buildings from internal chemical and biological threats. PhD thesis, Purdue University, USA.
Nani, G; Edwards, P J; Adjei-Kumi, T; Badu, E and Amoah, P (2008) Customisation and desirable characteristics of a standard method of measurement for building works in Ghana. Construction Economics and Building, 8(2), pp. 30-40. ISSN 2204-9029
Nasirzadeh, F; Afshar, A; Khanzadi, M and Howick, S (2008) Integrating system dynamics and fuzzy logic modelling for construction risk management. Construction Management and Economics, 26(11), pp. 1197-1212. ISSN 1466433X
Nasrallah, W F and Bou-Matar, R (2008) Exponential, gamma, and power law distributions in information flow on a construction site. Journal of Construction Engineering and Management, 134(6), pp. 442-450. ISSN 0733-9364
Naylor, G; Morgan, A and Raidén, A B (2008) Does construction skills policy reflect local needs for skills investment? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ndekugri, I; Braimah, N and Gameson, R (2008) Delay analysis within construction contracting organizations. Journal of Construction Engineering and Management, 134(9), pp. 692-700. ISSN 0733-9364
Negahban, S (2008) Utilization of enterprise resource planning tools by small to medium size construction organizations: A decision-making model. PhD thesis, University of Maryland, College Park, USA.
Ness, K and Green, S (2008) Respect for people in the enterprise culture? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Neves, J C and Bugalho, A (2008) Coordination and control in emerging international construction firms. Construction Management and Economics, 26(1), pp. 3-13. ISSN 1466433X
Newton, S (2008) Changing the framework for leadership in the construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ng, S T and Tang, Z (2008) Delineating the predominant criteria for subcontractor appraisal and their latent relationships. Construction Management and Economics, 26(3), pp. 249-259. ISSN 1466433X
Ng, S T and Xie, J (2008) A simulation model for evaluating the tariff stability of concession-based PPP proposals. Construction Innovation, 8(2), pp. 106-119. ISSN 1471-4175
Ng, S T and Zhang, Y (2008) Optimizing construction time and cost using ant colony optimization approach. Journal of Construction Engineering and Management, 134(9), pp. 721-728. ISSN 0733-9364
Ng, T; Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO 9000-based quality management systems to construction contractors. Construction Economics and Building, 8(2), pp. 23-29. ISSN 2204-9029
Ngamthampunpol, D (2008) An assessment of safety management in the Thai construction industry. DSc thesis, George Washington University, USA.
Nguyen, L D and Ibbs, W (2008) Flora: New forensic schedule analysis technique. Journal of Construction Engineering and Management, 134(7), pp. 483-491. ISSN 0733-9364
Nguyen, T H; Berstein, S; McIntyre, C and Smith, G R (2008) Customer service management practices in the homebuilding industry. International Journal of Construction Education and Research, 4(1), pp. 3-17. ISSN 1557-8771
Nguyen, T H; Shehab, T and Gao, Z (2008) Selecting an architecture-engineering team by using fuzzy set theory. Engineering, Construction and Architectural Management, 15(3), pp. 282-298. ISSN 0969-9988
Nyström, J (2008) A quasi-experimental evaluation of partnering. Construction Management and Economics, 26(5), pp. 531-541. ISSN 1466433X
Nzekwe-Excel, C; Nwagboso, C; Proverbs, D and Georgakis, P (2008) An approach for evaluating the satisfaction of a construction project team. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
ng, S T; Fang, Y and Skitmore, R M (2008) Negotiation of on-site buffer stocks: A fuzzy non-structural fuzzy decision support system approach. Construction Innovation, 8(3), pp. 202-217. ISSN 1471-4175
ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175
O
Ochieng, E G (2008) Framework for managing multi-cultural project teams. PhD thesis, Loughborough University, UK.
Odeyinka, H A; Lowe, J and Kaka, A (2008) An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 13(1), pp. 5-17. ISSN 1366-4387
Oko, J A (2008) Ethical behaviour of Nigerian building industry professionals in the procurement of building projects. PhD thesis, University of Lagos, Nigeria.
Olander, S and Landin, A (2008) A comparative study of factors affecting the external stakeholder management process. Construction Management and Economics, 26(6), pp. 553-561. ISSN 1466433X
Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), pp. 60-79. ISSN 1366-4387
Olbina, S (2008) Improving the delivery system for teaching the project planning and feasibility/site development course to building construction undergraduate students and real estate graduate students. International Journal of Construction Education and Research, 4(1), pp. 46-64. ISSN 1557-8771
Olbina, S; Grosskopf, K; Johns, T and Scicchitano, M (2008) Perceptions of scholarly standards in technical publication. International Journal of Construction Education and Research, 4(3), pp. 210-226. ISSN 1557-8771
Ong, Eric Mei Siang (2008) Trust, commitment, satisfaction and learning in construction project teams. PhD thesis, University of New South Wales, Australia.
Onukwube, H N (2008) Construction professionals motivation and job performance: A comparison of indigenous and expatriate construction contractors in Nigeria. PhD thesis, University of Lagos, Nigeria.
Oo, B L; Drew, D S and Lo, H P (2008) Heterogeneous approach to modeling contractors' decision-to-bid strategies. Journal of Construction Engineering and Management, 134(10), pp. 766-775. ISSN 0733-9364
Oo, B-L; Drew, D and Lo, H-P (2008) Comparing contractors' decision to bid in different market environments. Construction Economics and Building, 8(1), pp. 1-10. ISSN 2204-9029
Oo, B-L and Drew, D S (2008) Adapting building design to access by individuals with intellectual disability. Construction Economics and Building, 8(1), pp. 11-22. ISSN 2204-9029
Othman, A E E and Mia, B (2008) Corporate social responsibility for solving the housing problem for the poor in South Africa. Journal of Engineering, Design and Technology, 6(3), pp. 237-257. ISSN 1726-0531
Ozorhon, B; Arditi, D; Dikmen, I and Birgonul, M T (2008) Implications of culture in the performance of international construction joint ventures. Journal of Construction Engineering and Management, 134(5), pp. 361-370. ISSN 0733-9364
P
Palaneeswaran, E; Love, P E D; Kumaraswamy, M M and Ng, T S T (2008) Mapping rework causes and effects using artificial neural networks. Building Research & Information, 36(5), pp. 450-465. ISSN 0961-3218
Paliari, José Carlos (2008) Method for the prognosis of productivity and the unitary consumption of materials: Hydraulic building systems. PhD thesis, Universidade de São Paulo, Brazil.
Pan, W; Gibb, A G F and Dainty, A R J (2008) Leading UK housebuilders' utilization of offsite construction methods. Building Research & Information, 36(1), pp. 56-67. ISSN 0961-3218
Pan, W; Gibb, A G F and Sellars, A B (2008) Maintenance cost implications of utilizing bathroom modules manufactured offsite. Construction Management and Economics, 26(10), pp. 1067-1077. ISSN 1466433X
Pantouvakis, J P and Manoliadis, O G (2008) A compromise programming model for site selection of borrow pits. Construction Management and Economics, 26(5), pp. 433-446. ISSN 1466433X
Panuwatwanich, K; Stewart, R A and Mohamed, S (2008) The role of climate for innovation in enhancing business performance: The case of design firms. Engineering, Construction and Architectural Management, 15(5), pp. 407-422. ISSN 0969-9988
Panuwatwanich, Kriengsak (2008) Modelling the innovation diffusion process in Australian architectural and engineering design organisations. PhD thesis, Griffith University, Australia.
Parkhurst, G and Parnaby, R (2008) Growth in mobile air-conditioning: A socio-technical research agenda. Building Research & Information, 36(4), pp. 351-362. ISSN 0961-3218
Patsiadas, P and Angelides, D C (2008) Legislative frameworks for port concessions in Greece. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 157-162. ISSN 17514312
Perkinson, C L (2008) The use of computing technology in highway construction contractor companies as a total jobsite management tool (TJMT). PhD thesis, Florida International University, USA.
Petrovic-Lazarevic, S (2008) The development of corporate social responsibility in the Australian construction industry. Construction Management and Economics, 26(2), pp. 93-101. ISSN 1466433X
Peña-Mora, F; Han, S; Lee, S and Park, M (2008) Strategic-operational construction management: Hybrid system dynamics and discrete event approach. Journal of Construction Engineering and Management, 134(9), pp. 701-710. ISSN 0733-9364
Phelps, A F (2008) Lean information flow in complex healthcare projects and the role of the “integrator” as information flow manager. PhD thesis, Pennsylvania State University, USA.
Pheng, L S and Hou, C W (2008) Middle management's influence on the effectiveness of ISO 9000 quality management systems in architectural firms. Architectural Engineering and Design Management, 4(3-4), pp. 189-205. ISSN 1745-2007
Pheng, L S; Raphael, B and Ping, L S (2008) Analysing construction trends in the European Union using geographic information systems. Journal of Construction in Developing Countries, 13(1), pp. 1-26. ISSN 1823-6499
Phillips, S; Martin, J; Dainty, A and Price, A (2008) Analysis of the quality attributes used in establishing best value tenders in the UK social housing sector. Engineering, Construction and Architectural Management, 15(4), pp. 307-320. ISSN 0969-9988
Pirooz Far Poorang, A E (2008) Mass-constomisation: The application on design, fabrication and implementation (DFI) processes of building envelopes. PhD thesis, University of Sheffield, UK.
Pivo, G (2008) Responsible property investment criteria developed using the Delphi method. Building Research & Information, 36(1), pp. 20-36. ISSN 0961-3218
Plotnick, F L (2008) Rdm: Relationship diagramming method. PhD thesis, Drexel University, USA.
Polat, G (2008) Factors affecting the use of precast concrete systems in the United States. Journal of Construction Engineering and Management, 134(3), pp. 169-178. ISSN 0733-9364
Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.
Powell, A; Hassan, T; Dainty, A and Carter, C (2008) The under-representation of women in European construction research. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Prasertrungruang, T and Hadikusumo, B H W (2008) System dynamics modelling of machine downtime for small to medium highway contractors. Engineering, Construction and Architectural Management, 15(6), pp. 540-561. ISSN 0969-9988
Pulket, T (2008) Universal prediction model for construction litigation. PhD thesis, Illinois Institute of Technology, USA.
Puplampu, A B and Tutesigensi, A (2008) Blended learning for project management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
R
Rabeneck, A (2008) A sketch-plan for construction of built environment theory. Building Research & Information, 36(3), pp. 269-279. ISSN 0961-3218
Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2008) A conceptual knowledge-based cost model for optimizing the selection of materials and technology for building design. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Raidén, A B; Dainty, A R J and Neale, R H (2008) Understanding employee resourcing in construction organizations. Construction Management and Economics, 26(11), pp. 1133-1143. ISSN 1466433X
Raidén, A B; Williams, H and Dainty, A (2008) Human resource information systems in construction: A review seven years on. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Raisbeck, P (2008) Perceptions of architectural design and project risk: Understanding the architects' role in a PPP project. Construction Management and Economics, 26(11), pp. 1145-1157. ISSN 1466433X
Ramayah, T and Jaafar, M (2008) Technology usage among construction students the moderating role of gender. Journal of Construction in Developing Countries, 13(1), pp. 63-77. ISSN 1823-6499
Rameezdeen, R and Ramachandra, T (2008) Construction linkages in a developing economy: The case of Sri Lanka. Construction Management and Economics, 26(5), pp. 499-506. ISSN 1466433X
Rawlinson, F and Farrell, P (2008) Construction: A culture for concern? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Regeczi, David Joseph (2008) Private equity, public principle: Evaluating the legitimacy and sustainability of public-private partnerships. PhD thesis, University of Twente, Netherlands.
Ren, Z; Atout, M and Jones, J (2008) Root causes of construction project delays in Dubai. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Renier, B and Volker, L (2008) The architect as a system integrator? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Reymen, I M M J; Dewulf, G P M R and Blokpoel, S B (2008) Framework for managing uncertainty in property projects. Building Research & Information, 36(6), pp. 580-592. ISSN 0961-3218
Riaz, Z (2008) Improving construction plant safety using advanced ICT. PhD thesis, Loughborough University, UK.
Rojas, E M (2008) Single versus multiple prime contracting. Journal of Construction Engineering and Management, 134(10), pp. 758-765. ISSN 0733-9364
Rojas, E M and Kell, I (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387-397. ISSN 0733-9364
Rooke, J; Molloy, E M; Sinclair, M; Koskela, L; Siriwardena, M; Kagioglou, M and Siemieniuch, C (2008) Models and metaphors: Complexity theory and through-life management in the built environment. Architectural Engineering and Design Management, 4(1), pp. 47-57. ISSN 1745-2007
Rosas Sanchez, L (2008) Application of game modeling to good tunneling practice. PhD thesis, University of Colorado at Boulder, USA.
Roumboutsos, A and Anagnostopoulos, K P (2008) Public private partnership projects in Greece: Risk ranking and preferred risk allocation. Construction Management and Economics, 26(7), pp. 751-763. ISSN 1466433X
Rowlinson, S and Cheung, Y K F (2008) Stakeholder management through empowerment: Modelling project success. Construction Management and Economics, 26(6), pp. 611-623. ISSN 1466433X
Rutten, M E J; Dorée, A G and Halman, J I M (2008) How companies without the benefit of authority create innovation through collaboration. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ryan, M A (2008) Women who build buildings: The experiences of student affairs professionals in constructing student-focused space on university campuses. EdD thesis, University of St. Thomas, USA.
Ryan, R C (2008) Use of an e-text as a primary course resource. International Journal of Construction Education and Research, 4(2), pp. 97-114. ISSN 1557-8771
Ryu, S R; Rhee, K N; Yeo, M S and Kim, K W (2008) Strategies for flow rate balancing in radiant floor heating systems. Building Research & Information, 36(6), pp. 625-637. ISSN 0961-3218
S
Salama, M; El Hamid, M A and Keogh, B (2008) Investigating the causes of delay within oil and gas projects in the UAE. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Salem, O and Mohanty, S (2008) Project management practices and information technology research. Journal of Construction Engineering and Management, 134(7), pp. 501-508. ISSN 0733-9364
Salvatierra-Garrido, J; Pasquire, C and Thorpe, T (2008) Social housing in Chile: Opportunities to apply value concept in early stage of projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Sanad, H M; Ammar, M A and Ibrahim, M E (2008) Optimal construction site layout considering safety and environmental aspects. Journal of Construction Engineering and Management, 134(7), pp. 536-544. ISSN 0733-9364
Sang, K J C; Dainty, A R J and Ison, S G (2008) The impact of self-employment on architects' job satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Sanni, A A and Windapo, A O (2008) Evaluation of contractor’s quality control practices on construction sites in Nigeria. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Sapri, M (2008) Using the repertory grid technique for the appraisal of facilities performance within higher education institutions: Library case study. PhD thesis, Heriot-Watt University, UK.
Sarhan, M (2008) Risk-based approach in highway geometric design. PhD thesis, Carleton University, Canada.
Sartori, I; Bergsdal, H; Muller, D B and Brattebø, H (2008) Towards modelling of construction, renovation and demolition activities: Norway's dwelling stock, 1900-2100. Building Research & Information, 36(5), pp. 412-425. ISSN 0961-3218
Sassi, P (2008) Defining closed-loop material cycle construction. Building Research & Information, 36(5), pp. 509-519. ISSN 0961-3218
Sawant, R J (2008) The economics of large scale infrastructure project finance: An empirical examination of the propensity to project finance. PhD thesis, Tufts University, USA.
Schatteman, D; Herroelen, W; Van De Vonder, S and Boone, A (2008) Methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134(11), pp. 885-893. ISSN 0733-9364
Sear, E A; Hartland, T G; Abdel-Wahab, M S and Miller, C G (2008) Implementing customer relationship management at constructionskills. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Selĺs, M E S; Rubio, J A C and Mullor, J R (2008) Development of a quantification proposal for hidden quality costs: Applied to the construction sector. Journal of Construction Engineering and Management, 134(10), pp. 749-757. ISSN 0733-9364
Senaratne, S and Sexton, M (2008) Managing construction project change: A knowledge management perspective. Construction Management and Economics, 26(12), pp. 1303-1311. ISSN 1466433X
Seo, J W and Choi, H H (2008) Risk-based safety impact assessment methodology for underground construction projects in Korea. Journal of Construction Engineering and Management, 134(1), pp. 72-81. ISSN 0733-9364
Sha, K; Yang, J and Song, R (2008) Competitiveness assessment system for China's construction industry. Building Research & Information, 36(1), pp. 97-109. ISSN 0961-3218
Shakantu, W; Muya, M; Tookey, J and Bowen, P (2008) Flow modelling of construction site materials and waste logistics: A case study from Cape Town, South Africa. Engineering, Construction and Architectural Management, 15(5), pp. 423-439. ISSN 0969-9988
Shakantu, W; Muya, M; Tookey, J and Bown, P (2008) Evaluating truck empty running in construction: A case study from Cape Town, South Africa. Construction Economics and Building, 8(2), pp. 41-49. ISSN 2204-9029
Shapira, A; Rosenfeld, Y and Mizrahi, I (2008) Vision system for tower cranes. Journal of Construction Engineering and Management, 134(5), pp. 320-332. ISSN 0733-9364
Shehu, Z (2008) The framework for effective adoption and implementation of programme management within the UK construction industry. PhD thesis, Glasgow Caledonian University, UK.
Sheth, A; Price, A D F; Glass, J and Achour, N (2008) Reviewing the sustainability of existing healthcare facilities. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Shim, E (2008) The decision-making modeling for concurrent planning of construction projects. PhD thesis, Texas A&M University, USA.
Short, C A (2008) What is 'architectural design research'? Building Research & Information, 36(2), pp. 195-199. ISSN 0961-3218
Showalter, W E and Halpin, D W (2008) Dynamic programming approach to optimization of site remediation. Journal of Construction Engineering and Management, 134(10), pp. 820-827. ISSN 0733-9364
Siddiqui, M K (2008) Coordination of distributed schedules in a heterogeneous environment: identification of conflicts using schedule mappings. PhD thesis, University of Texas at Austin, USA.
Siringoringo, W S; Connor, A M; Clements, N and Alexander, N (2008) Minimum cost polygon overlay with rectangular shape stock panels. International Journal of Construction Education and Research, 4(3), pp. 153-176. ISSN 1557-8771
Sirotiak, T L (2008) The effect of problem/project-based learning on a desired skill set for construction professionals. PhD thesis, Iowa State University, USA.
Skitmore, M (2008) First and second price independent values sealed bid procurement auctions: Some scalar equilibrium results. Construction Management and Economics, 26(8), pp. 785-801. ISSN 1466433X
Slater, R and Radford, A (2008) Perceptions in the Australian building industry of deficiencies in architects' design documentation and the effects on project procurement. Construction Economics and Building, 8(1), pp. 23-33. ISSN 2204-9029
Smith, B W (2008) Temporary construction lighting of buildings: An evaluation of four techniques, both qualitative and quantitative. International Journal of Construction Education and Research, 4(2), pp. 132-149. ISSN 1557-8771
Smith, G and Ceranic, B (2008) Spatial layout planning in sub-surface rail station design for effective fire evacuation. Architectural Engineering and Design Management, 4(2), pp. 99-120. ISSN 1745-2007
Smith, N J and Gannon, M (2008) Political risk in light rail transit PPP projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 179-185. ISSN 17514312
Smith, S D; Beausang, P; Moriarty, D and Campbell, J M (2008) Subjectivity in data extraction: A study based on construction hazard identification. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Smith, V R R (2008) Impact to alternative contracting methods using multivariate analysis in the regulatory environment. PhD thesis, Georgia Institute of Technology, USA.
Smyth, H (2008) The credibility gap in stakeholder management: Ethics and evidence of relationship management. Construction Management and Economics, 26(6), pp. 633-643. ISSN 1466433X
Sohail, M and Cavill, S (2008) Accountability to prevent corruption in construction projects. Journal of Construction Engineering and Management, 134(9), pp. 729-738. ISSN 0733-9364
Solovyova, I (2008) The role of the autobiographical experiences with emotional significance of an architect in design conjecturing. PhD thesis, Texas A&M University, USA.
Song, L and Abourizk, S M (2008) Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134(10), pp. 786-794. ISSN 0733-9364
Sonmez, R (2008) Parametric range estimating of building costs using regression models and bootstrap. Journal of Construction Engineering and Management, 134(12), pp. 1011-1016. ISSN 0733-9364
Sourani, A (2008) Realising sustainable construction through procurement stratergies. PhD thesis, Loughborough University, UK.
Ssegawa-Kaggwa, J (2008) Adequacy of project based financial management systems of small and medium construction enterprises in Botswana. DBL thesis, University of South Africa, South Africa.
Stenbeck, T (2008) Quantifying effects of incentives in a rail maintenance performance-based contract. Journal of Construction Engineering and Management, 134(4), pp. 265-272. ISSN 0733-9364
Stoy, C; Pollalis, S and Schalcher, H R (2008) Drivers for cost estimating in early design: Case study of residential construction. Journal of Construction Engineering and Management, 134(1), pp. 32-39. ISSN 0733-9364
Strengers, Y (2008) Comfort expectations: The impact of demand-management strategies in Australia. Building Research & Information, 36(4), pp. 381-391. ISSN 0961-3218
Styhre, A (2008) The role of social capital in knowledge sharing: The case of a specialist rock construction company. Construction Management and Economics, 26(9), pp. 941-951. ISSN 1466433X
Sulaiman, K (2008) A study of building procurement process as a potential tool to enhance safety practice in the construction industry. PhD thesis, University of Salford, UK.
Sundqvist, J (2008) From focus on price to the pyramid of innovation, information, cooperation, value and trust: A success story of five Swedish building material manufacturers. Construction Economics and Building, 8(2), pp. 11-22. ISSN 2204-9029
Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(2), pp. 132-148. ISSN 0969-9988
Swider, S C (2008) Behind great walls: Modes of employment among migrant construction workers in China's informal labor market. PhD thesis, University of Wisconsin - Madison, USA.
Szalay, Z (2008) Modelling building stock geometry for energy, emission and mass calculations. Building Research & Information, 36(6), pp. 557-567. ISSN 0961-3218
T
Tam, C M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(2), pp. 120-136. ISSN 1471-4175
Tam, V W Y and Le, K N (2008) On using the Gaussian and hyperbolic distributions to improve quality in construction. Journal of Engineering, Design and Technology, 6(2), pp. 112-123. ISSN 1726-0531
Tam, V W Y; Le, K N and Le, H N (2008) Using Gaussian and hyperbolic distributions for quality improvement in construction: Case study approach. Journal of Construction Engineering and Management, 134(7), pp. 555-561. ISSN 0733-9364
Tam, V W Y and Tam, C M (2008) Waste reduction through incentives: A case study. Building Research & Information, 36(1), pp. 37-43. ISSN 0961-3218
Tanaka, M (2008) Essays on durability and the Japanese housing market. PhD thesis, Johns Hopkins University, USA.
Tang, W; Qiang, M; Duffield, C F; Young, D M and Lu, Y (2008) Incentives in the Chinese construction industry. Journal of Construction Engineering and Management, 134(7), pp. 457-467. ISSN 0733-9364
Tas, E; Yaman, H and Tanacan, L (2008) A building material evaluation and selection model for the Turkish construction sector. Engineering, Construction and Architectural Management, 15(2), pp. 149-163. ISSN 0969-9988
Taylor, T R B and Ford, D N (2008) Managing tipping point dynamics in complex construction projects. Journal of Construction Engineering and Management, 134(6), pp. 421-431. ISSN 0733-9364
Tehranchi, H (2008) Stakeholders' attitudes to systematic risk management in infrastructure projects: A comparative study of projects in Iran and Sweden. PhD thesis, University of Reading, UK.
Tennant, S and Langford, D (2008) The construction project balanced scorecard. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Teoh, M C; Low, S P and Raphael, B (2008) Computer-based cartography: A marketing information system tool for the EU construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Tesfamariam, S (2008) Seismic risk assessment of reinforced concrete buildings using fuzzy based techniques. PhD thesis, University of Ottawa, Canada.
Thomson, C S; El-Haram, M A; Hardcastle, C and Horner, R M W (2008) Developing an urban sustainability assessment protocol reflecting the project lifecycle. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Thorpe, D and Karan, E (2008) Method for calculating schedule delay considering weather conditions. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Tombesi, P (2008) Out of what? Locating the underpinnings of theory. Building Research & Information, 36(6), pp. 668-673. ISSN 0961-3218
Tomkins, C D (2008) Allocation and pricing of water resources. PhD thesis, Stanford University, USA.
Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking. PhD thesis, Luleå University of Technology, Sweden.
Toor, S U R and Ofori, G (2008) Tipping points that inspire leadership: An exploratory study of emergent project leaders. Engineering, Construction and Architectural Management, 15(3), pp. 212-229. ISSN 0969-9988
Toor, S U R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), pp. 395-408. ISSN 1466433X
Towner, M and Baccarini, D (2008) Risk pricing in construction tenders: how, who, what. Construction Economics and Building, 8(1), pp. 49-60. ISSN 2204-9029
Tsai, M-T (2008) Real option-based procurement for transportation services. PhD thesis, University of California, Irvine, USA.
Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects. PhD thesis, University of California, Berkeley, USA.
Tutesigensi, A and Hj Mohammad, S A (2008) A framework for introducing the private finance initiative in the Brunei darussalam construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Tutesigensi, A and Pleim, V (2008) Why small and medium construction enterprises do not employ six sigma. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Tzortzatou, E P (2008) Culture impact in construction supply chain management. PhD thesis, University College London, UK.
U
Uddin, W (2008) Airborne laser terrain mapping for expediting highway projects: Evaluation of accuracy and cost. Journal of Construction Engineering and Management, 134(6), pp. 411-420. ISSN 0733-9364
Uher, T E and Brand, M C (2008) Claimants' view of the performance of adjudication in New South Wales. Engineering, Construction and Architectural Management, 15(5), pp. 470-484. ISSN 0969-9988
V
Vander Schaaf, R E (2008) A system-of-system (sos) approach for improved decision-making in infrastructure project selection problems. PhD thesis, Purdue University, USA.
Vaz, D; Al Bizri, S and Gray, C (2008) The management of the design of modern curtain wall cladding systems. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Vennström, A (2008) The construction client as a change agent contextual support and obstacles. PhD thesis, Luleå University of Technology, Sweden.
Vinodh, S; Sundararaj, G; Devadasan, S R and Rajanayagam, D (2008) Quantification of agility: An experimentation in an Indian electronics switches manufacturing company. Journal of Engineering, Design and Technology, 6(1), pp. 48-64. ISSN 1726-0531
Vischer, J C (2008) Towards a user-centred theory of the built environment. Building Research & Information, 36(3), pp. 231-240. ISSN 0961-3218
Visscher, H; Suddle, S and Meijer, F (2008) Quantitative risk analysis as a supporting tool for safety protocols at multi-functional urban locations. Construction Innovation, 8(4), pp. 269-279. ISSN 1471-4175
Voelker, C; Permana, A; Sachs, T and Tiong, R (2008) Political risk perception in Indonesian power projects. Journal of Financial Management of Property and Construction, 13(1), pp. 18-34. ISSN 1366-4387
Volker, L and Lauche, K (2008) Decision making during a tendering procedure: Case studies of restricted European tenders in architecture. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Vrijhoef, R and de Ridder, H (2008) Methodological challenges of knowledge production in construction management research: The case of a postgraduate research into supply chain integration. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
van Egmond-deWilde de Ligny, E and Erkelens, P (2008) Construction technology diffusion in developing countries: Limitations of prevailing innovation systems. Journal of Construction in Developing Countries, 13(2), pp. 43-63. ISSN 1823-6499
W
Waara, F (2008) Mitigating contractual hazards in public procurement: A study of Swedish local authorities. Construction Management and Economics, 26(2), pp. 137-145. ISSN 1466433X
Wachira, N; Root, D; Bowen, P and Olima, W (2008) Changing craft skills in the Kenyan construction sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Waddell, H (2008) Sustainable construction and UK legislation and policy. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 127-132. ISSN 17514312
Walker, D H T; Bourne, L M and Shelley, A (2008) Influence, stakeholder mapping and visualization. Construction Management and Economics, 26(6), pp. 645-658. ISSN 1466433X
Wall, J and Ahmed, V (2008) Lessons learned from a case study in deploying blended learning continuing professional development. Engineering, Construction and Architectural Management, 15(2), pp. 185-202. ISSN 0969-9988
Walters, R; Jaselskis, E; Zhang, J; Mueller, K and Kaewmoracharoen, M (2008) Using scanning lasers to determine the thickness of concrete pavement. Journal of Construction Engineering and Management, 134(8), pp. 583-591. ISSN 0733-9364
Wamuziri, S (2008) Improving safety performance in construction through cultural change. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Wamuziri, S and Jiang, M (2008) Role of export credit agencies in PFI/PPP projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 163-169. ISSN 17514312
Wang, J Y; Kang, X P and Tam, V W Y (2008) An investigation of construction wastes: An empirical study in Shenzhen. Journal of Engineering, Design and Technology, 6(3), pp. 227-236. ISSN 1726-0531
Wang, W (2008) The built environment through the cultural-architectural lens. Building Research & Information, 36(6), pp. 674-676. ISSN 0961-3218
Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2008) Craft training issues in American industrial and commercial construction. Journal of Construction Engineering and Management, 134(10), pp. 795-803. ISSN 0733-9364
Ward, S and Chapman, C (2008) Stakeholders and uncertainty management in projects. Construction Management and Economics, 26(6), pp. 563-577. ISSN 1466433X
Waroonkun, T and Stewart, R A (2008) Pathways to enhanced value creation from the international technology transfer process in Thai construction projects. Construction Innovation, 8(4), pp. 299-317. ISSN 1471-4175
Wasif, I; Josephson, P-E and Styhre, A (2008) Individual learning in construction projects: Professions and their approaches. Construction Economics and Building, 8(2), pp. 50-60. ISSN 2204-9029
Waters, J and Raidén, A B (2008) Consideration of personal safety in project deployment. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Wedding, G C (2008) Understanding sustainability in real estate: A focus on measuring and communicating success in green building. PhD thesis, University of North Carolina at Chapel Hill, USA.
Wernsman, M G (2008) The process of designing and constructing an accessible residence hall for people with disabilities on a public university campus. PhD thesis, Colorado State University, USA.
Wiliem, Leonard (2008) Incorporating interdependence in risk likelihood analysis to enhance diagnostics in condition monitoring. PhD thesis, Queensland University of Technology, Australia.
Wilkinson, S and Farhi, C (2008) Could the NEC be widely used in New Zealand? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 107-113. ISSN 17514312
Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Winarno, S; Griffith, A and Stephenson, P (2008) Earthquake risk reduction to non-engineered buildings: A study of practice in Indonesia. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Wong, J M W; Chan, A P C and Chiang, Y H (2008) Modeling and forecasting construction labor demand: Multivariate analysis. Journal of Construction Engineering and Management, 134(9), pp. 664-672. ISSN 0733-9364
Wong, J M W; Chiang, Y H and Ng, T S (2008) Construction and economic development: The case of Hong Kong. Construction Management and Economics, 26(8), pp. 815-826. ISSN 01446193
Wong, J-M (2008) Extending performance-based design methods by applying structural engineering design patterns. PhD thesis, University of California, Berkeley, USA.
Wood, H L and Gidado, K (2008) An overview of complexity theory and its application to the construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Wu, Chee Shien Jeremy (2008) A comparative study of three international construction firms: Knowledge management infrastructures for optimising organisations' learning. PhD thesis, University of Sydney, Australia.
Wu, J (2008) A behavioral analysis of learning processes amongst construction project team members in China. PhD thesis, University of Hong Kong, Hong Kong.
Wu, S and Udeaja, C (2008) Developing a framework for measuring collaborative working and project performance. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
X
Xiao, H and Boyd, D (2008) Analysing cultural problems in international projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Xiong, Y and Kuang, Y (2008) Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off. Journal of Construction Engineering and Management, 134(2), pp. 153-156. ISSN 0733-9364
Xue, X; Shen, Q; Wang, Y and Lu, J (2008) Measuring the productivity of the construction industry in China by using DEA-based malmquist productivity indices. Journal of Construction Engineering and Management, 134(1), pp. 64-71. ISSN 0733-9364
Y
Yang, F (2008) Collaborative optimisation in building design with a Pareto-based genetic algorithm. PhD thesis, Loughborough University, UK.
Yang, I T (2008) Distribution-free Monte Carlo simulation: Premise and refinement. Journal of Construction Engineering and Management, 134(5), pp. 352-360. ISSN 0733-9364
Yang, W and Kohler, N (2008) Simulation of the evolution of the Chinese building and infrastructure stock. Building Research & Information, 36(1), pp. 1-19. ISSN 0961-3218
Ye, K; Jiang, W and Shen, L (2008) Project competition intensity (PCI) in the construction market: A case study in China. Construction Management and Economics, 26(5), pp. 463-470. ISSN 01446193
Ye, S and Liu, Y (2008) Study on development patterns of infrastructure projects. Journal of Construction Engineering and Management, 134(2), pp. 94-102. ISSN 0733-9364
Yeung, J F Y; Chan, A P C and Chan, D W M (2008) Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(3), pp. 277-301. ISSN 1466433X
Yip, B; Rowlinson, S and Siu, O L (2008) Coping strategies as moderators in the relationship between role overload and burnout. Construction Management and Economics, 26(8), pp. 871-882. ISSN 01446193
Yong, K T and Pheng, L S (2008) Organizational culture and TQM implementation in construction firms in Singapore. Construction Management and Economics, 26(3), pp. 237-248. ISSN 1466433X
Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364
Yu, A T W; Shen, Q; Kelly, J and Hunter, K (2008) Comparative study of the variables in construction project briefing/architectural programming. Journal of Construction Engineering and Management, 134(2), pp. 122-138. ISSN 0733-9364
Yun, G C (2008) The utility of knowledge mapping as an approach to improving corporate and project performance: a case study of a large South Korean consulting firm. PhD thesis, University of Salford, UK.
Yun, G Y (2008) Occupant behaviour in buildings: Thermal performance implications of window use patterns. PhD thesis, University of Cambridge, UK.
Yun, G Y; Steemers, K and Baker, N (2008) Natural ventilation in practice: Linking facade design, thermal performance, occupant perception and control. Building Research & Information, 36(6), pp. 608-624. ISSN 0961-3218
Yung, P and Lai, L W C (2008) Supervising for quality: An empirical examination of institutional arrangements in China's construction industry. Construction Management and Economics, 26(7), pp. 723-737. ISSN 1466433X
Z
Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364
Zemke, D M V and Pullman, M (2008) Assessing the value of good design in hotels. Building Research & Information, 36(6), pp. 543-556. ISSN 0961-3218
Zhang, C; Zayed, T and Hammad, A (2008) Resource management of bridge deck rehabilitation: Jacques cartier bridge case study. Journal of Construction Engineering and Management, 134(5), pp. 311-319. ISSN 0733-9364
Zhang, H; Li, H and Lu, M (2008) Modeling time-constraints in construction operations through simulation. Journal of Construction Engineering and Management, 134(7), pp. 545-554. ISSN 0733-9364
Zhang, H and Wang, J Y (2008) Particle swarm optimization for construction site unequal-area layout. Journal of Construction Engineering and Management, 134(9), pp. 739-748. ISSN 0733-9364
Zhang, X; Austin, S; Glass, J and Mills, G (2008) Toward collective organizational values: A case study in UK construction. Construction Management and Economics, 26(10), pp. 1009-1028. ISSN 1466433X
Zhao, Z Y and Shen, L Y (2008) Are Chinese contractors competitive in international markets? Construction Management and Economics, 26(3), pp. 225-236. ISSN 1466433X
Zoiopoulos, I I; Morris, P W G and Smyth, H J (2008) Identifying organizational competencies in project oriented companies: An evolutionary approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Zou, P X W; Redman, S and Windon, S (2008) Case studies on risk and opportunity at design stage of building projects in australia: Focus on safety. Architectural Engineering and Design Management, 4(3-4), pp. 221-238. ISSN 1745-2007
Zou, P X W; Wang, S and Fang, D (2008) A life-cycle risk management framework for PPP infrastructure projects. Journal of Financial Management of Property and Construction, 13(2), pp. 123-142. ISSN 1366-4387
Zou, Y and Lee, S H (2008) The impacts of change management practices on project change cost performance. Construction Management and Economics, 26(4), pp. 387-393. ISSN 1466433X
Ö
Ökmen, Ö and Öztaş, A (2008) Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), pp. 49-63. ISSN 0733-9364
Up a level