Items where Year is 2006

Group by: Author(s) | Item Type | No Grouping
Number of items: 681.

Article

Abbott, C; Jeong, K and Allen, S (2006) The economic motivation for innovation in small construction companies. Construction Innovation, 6(3), pp. 187-196. ISSN 1471-4175

Abdul-Rahman, H; Berawi, M A; Berawi, A R; Mohamed, O; Othman, M and Yahya, I A (2006) Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management, 132(2), pp. 125-133. ISSN 0733-9364

Acharya, N K; Dai Lee, Y and Man im, H (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(6), pp. 543-566. ISSN 0969-9988

Acharya, N K; Lee, Y D and Im, H M (2006) Design errors: Tragic for the clients. Journal of Construction Research, 7(1), pp. 177-190. ISSN 1609-9451

Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: An investigation. Construction Management and Economics, 24(1), pp. 81-96. ISSN 01446193

Agbulos, A; Mohamed, Y; Al-Hussein, M; Abourizk, S and Roesch, J (2006) Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews. Journal of Construction Engineering and Management, 132(3), pp. 291-299. ISSN 0733-9364

Ahmed, V; Shaik, A and Aouad, G (2006) An ontology of construction education for e-learning via the semantic web. Architectural Engineering and Design Management, 2(1-2), pp. 87-99. ISSN 1745-2007

Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(1), pp. 45-54. ISSN 01446193

Aibinu, A A and Odeyinka, H A (2006) Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667-677. ISSN 0733-9364

Akinci, B; Kiziltas, S; Ergen, E; Karaesmen, I Z and Keceli, F (2006) Modeling and analyzing the impact of technology on data capture and transfer processes at construction sites: A case study. Journal of Construction Engineering and Management, 132(11), pp. 1148-1157. ISSN 0733-9364

Al-Ghassani, A M; Kamara, J M; Anumba, C J and Carrillo, P M (2006) Prototype system for knowledge problem definition. Journal of Construction Engineering and Management, 132(5), pp. 516-524. ISSN 0733-9364

Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 0969-9988

Allan, S; Jones, K and Walker, S (2006) Retrofitting e-learning to an existing distance learning course: A case study. Architectural Engineering and Design Management, 2(1-2), pp. 137-147. ISSN 1745-2007

Andi (2006) The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(1), pp. 69-80. ISSN 01446193

Anumba, C E H; Dainty, A; Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(6), pp. 616-633. ISSN 0969-9988

Appleton, B J A; Niaz, M A; Abourizk, S M; Al-Hussein, M and Mohamed, Y (2006) Priority rating logic simulation model for tower crane operations management. Journal of Construction Research, 7(1), pp. 133-147. ISSN 1609-9451

Arboleda, C A and Abraham, D M (2006) Evaluation of flexibility in capital investments of infrastructure systems. Engineering, Construction and Architectural Management, 13(3), pp. 254-274. ISSN 0969-9988

Asfour, O S and Gadi, M B (2006) Effect of integrating wind catchers with curved roofs on natural ventilation performance in buildings. Architectural Engineering and Design Management, 2(4), pp. 289-304. ISSN 1745-2007

Bai, Y and Burkett, W R (2006) Rapid bridge replacement: Processes, techniques, and needs for improvements. Journal of Construction Engineering and Management, 132(11), pp. 1139-1147. ISSN 0733-9364

Bai, Y; Burkett, W R and Nash, P T (2006) Lessons learned from an emergency bridge replacement project. Journal of Construction Engineering and Management, 132(4), pp. 338-344. ISSN 0733-9364

Baradan, S and Usmen, M A (2006) Comparative injury and fatality risk analysis of building trades. Journal of Construction Engineering and Management, 132(5), pp. 533-539. ISSN 0733-9364

Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(2), pp. 201-215. ISSN 0969-9988

Bayraktar, M E; Cui, Q; Hastak, M and Minkarah, I (2006) Warranty bonds from the perspective of surety companies. Journal of Construction Engineering and Management, 132(4), pp. 333-337. ISSN 0733-9364

Beavers, J E; Moore, J R; Rinehart, R and Schriver, W R (2006) Crane-related fatalities in the construction industry. Journal of Construction Engineering and Management, 132(9), pp. 901-910. ISSN 0733-9364

Beheiry, S M A; Chong, W K and Haas, C T (2006) Examining the business impact of owner commitment to sustainability. Journal of Construction Engineering and Management, 132(4), pp. 384-392. ISSN 0733-9364

Berryman, C W; Jensen, W G and Zhu, J (2006) Maximization of fly ash in the manufacture of reinforced concrete pipe. International Journal of Construction Education and Research, 2(3), pp. 209-216. ISSN 1557-8771

Best, R and Langston, C (2006) Evaluation of construction contractor performance: A critical analysis of some recent research. Construction Management and Economics, 24(4), pp. 439-445. ISSN 01446193

Bibby, L; Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(1), pp. 7-26. ISSN 0969-9988

Blismas, N; Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(2), pp. 121-130. ISSN 01446193

Blyth, K and Kaka, A (2006) A novel multiple linear regression model for forecasting S-curves. Engineering, Construction and Architectural Management, 13(1), pp. 82-95. ISSN 0969-9988

Bogus, S M; Molenaar, K R and Diekmann, J E (2006) Strategies for overlapping dependent design activities. Construction Management and Economics, 24(8), pp. 829-837. ISSN 1466433X

Boyd, David (2006) Developing a knowledge centric approach to construction education. Architectural Engineering and Design Management, 2(1-2), pp. 149-159. ISSN 1745-2007

Bridge, A J and Tisdell, C (2006) The determinants of the vertical boundaries of the construction firm: Response. Construction Management and Economics, 24(3), pp. 233-236. ISSN 01446193

Brilakis, I and Soibelman, L (2006) Multimodal image retrieval from construction databases and model-based systems. Journal of Construction Engineering and Management, 132(7), pp. 777-785. ISSN 0733-9364

Briscoe, G (2006) How useful and reliable are construction statistics? Building Research & Information, 34(3), pp. 220-229. ISSN 0961-3218

Burroughs, S (2006) Strength of compacted earth: Linking soil properties to stabilizers. Building Research & Information, 34(1), pp. 55-65. ISSN 0961-3218

Buys, F and Nkado, R (2006) A survey of maintenance management systems in South African tertiary educational institutions. Construction Management and Economics, 24(10), pp. 997-1005. ISSN 1466433X

Caldas, C H; Torrent, D G and Haas, C T (2006) Using global positioning system to improve materials-locating processes on industrial projects. Journal of Construction Engineering and Management, 132(7), pp. 741-749. ISSN 0733-9364

Carmichael, S and Murray, M (2006) Record keeping for contemporaneous delay analysis: A model for effective event management. Construction Management and Economics, 24(10), pp. 1007-1018. ISSN 1466433X

Carrillo, P M; Robinson, H S; Anumba, C J and Bouchlaghem, N M (2006) A knowledge transfer framework: The PFI context. Construction Management and Economics, 24(10), pp. 1045-1056. ISSN 1466433X

Carter, G and Smith, S D (2006) Safety hazard identification on construction projects. Journal of Construction Engineering and Management, 132(2), pp. 197-205. ISSN 0733-9364

Caven, V (2006) Career building: Women and non-standard employment in architecture. Construction Management and Economics, 24(5), pp. 457-464. ISSN 1466433X

Chan, A P C; Chiang, Y H; Mak, S W K; Choy, L H T and James, M W W (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(1), pp. 3-19. ISSN 1471-4175

Chan, E H W; Suen, H C H and Chan, C K L (2006) Maut-based dispute resolution selection model prototype for international construction projects. Journal of Construction Engineering and Management, 132(5), pp. 444-451. ISSN 0733-9364

Chang, A S and Tien, C C (2006) Quantifying uncertainty and equivocality in engineering projects. Construction Management and Economics, 24(2), pp. 171-184. ISSN 01446193

Chang, C Y (2006) The determinants of the vertical boundaries of the construction firm: Comment. Construction Management and Economics, 24(3), pp. 229-232. ISSN 01446193

Chang, C Y; Chou, H Y and Wang, M T (2006) Characterizing the corporate governance of UK listed construction companies. Construction Management and Economics, 24(6), pp. 647-656. ISSN 1466433X

Cheah, C Y J; Chew, D A S and Huang, J (2006) Marketing foreign interior design services in China. Building Research & Information, 34(6), pp. 584-595. ISSN 0961-3218

Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(5), pp. 545-554. ISSN 1466433X

Chen, W T and Huang, Y H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Construction Management and Economics, 24(12), pp. 1231-1239. ISSN 1466433X

Cheng, E W L and Li, H (2006) Job performance evaluation for construction companies: An analytic network process approach. Journal of Construction Engineering and Management, 132(8), pp. 827-835. ISSN 0733-9364

Cheng, J; Proverbs, D G and Oduoza, C F (2006) The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(6), pp. 567-583. ISSN 0969-9988

Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(4), pp. 391-405. ISSN 01446193

Cheung, S O; Yiu, T W Y and Yeung, S F (2006) A study of styles and outcomes in construction dispute negotiation. Journal of Construction Engineering and Management, 132(8), pp. 805-814. ISSN 0733-9364

Chinyio, E and Morton, N (2006) The effectiveness of e-learning. Architectural Engineering and Design Management, 2(1-2), pp. 73-86. ISSN 1745-2007

Choi, S D; Griinke, D and Lederer, M (2006) Fall protection equipment effects on productivity and safety in residential roofing construction. Journal of Construction Research, 7(1), pp. 149-157. ISSN 1609-9451

Christofferson, J P; Wynn, K and Newitt, J S (2006) Assessing construction management higher education strategies: Increasing demand, limited resources, and over-enrollment. International Journal of Construction Education and Research, 2(3), pp. 181-192. ISSN 1557-8771

Chua, D K H and Godinot, M (2006) Use of a WBS matrix to improve interface management in projects. Journal of Construction Engineering and Management, 132(1), pp. 67-79. ISSN 0733-9364

Chung, T H; Mohamed, Y and Abourizk, S (2006) Bayesian updating application into simulation in the North Edmonton sanitary trunk tunnel project. Journal of Construction Engineering and Management, 132(8), pp. 882-894. ISSN 0733-9364

Clarke, L (2006) Valuing labour. Building Research & Information, 34(3), pp. 246-256. ISSN 0961-3218

Cleveland, T G and Fashokun, A (2006) Construction-associated solids loads with a temporary sediment control bmp. Journal of Construction Engineering and Management, 132(10), pp. 1122-1125. ISSN 0733-9364

Col Debella, D and Ries, R (2006) Construction delivery systems: A comparative analysis of their performance within school districts. Journal of Construction Engineering and Management, 132(11), pp. 1131-1138. ISSN 0733-9364

Cole, R (2006) Shared markets: Coexisting building environmental assessment methods. Building Research & Information, 34(4), pp. 357-371. ISSN 0961-3218

Consoli, G (2006) The architect's dilemma: A self reflection in understanding prison design and construction in private prison projects. Construction Economics and Building, 6(2), pp. 1-10. ISSN 2204-9029

Consoli, G G S (2006) Correctional management attitudes to private prison design and construction briefs in Australia. Journal of Construction Research, 7(1), pp. 99-109. ISSN 1609-9451

Costantino, N (2006) The contribution of Ranko Bon to the debate on sustainable construction. Construction Management and Economics, 24(7), pp. 705-709. ISSN 1466433X

Cottrell, D S (2006) Contractor process improvement for enhancing construction productivity. Journal of Construction Engineering and Management, 132(2), pp. 189-196. ISSN 0733-9364

Cox, R F; Issa, R R A and Frey, A (2006) Proposed subcontractor-based employee motivational model. Journal of Construction Engineering and Management, 132(2), pp. 152-163. ISSN 0733-9364

Crawford, P and Vogl, B (2006) Measuring productivity in the construction industry. Building Research & Information, 34(3), pp. 208-219. ISSN 0961-3218

Dai, H; Cao, G and Su, H (2006) Management and construction of the three gorges project. Journal of Construction Engineering and Management, 132(6), pp. 615-619. ISSN 0733-9364

Dammann, S and Elle, M (2006) Environmental indicators: Establishing a common language for green building. Building Research & Information, 34(4), pp. 387-404. ISSN 0961-3218

Damodaran, L and Shelbourn, M (2006) Collaborative working: the elusive vision. Architectural Engineering and Design Management, 2(4), pp. 227-243. ISSN 1745-2007

Dann, N; Hills, S and Worthing, D (2006) Assessing how organizations approach the maintenance management of listed buildings. Construction Management and Economics, 24(1), pp. 97-104. ISSN 01446193

Davey, C L; McDonald, J; Lowe, D; Duff, R; Powell, J A and Powell, J E (2006) Defects liability management by design. Building Research & Information, 34(2), pp. 145-153. ISSN 0961-3218

Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193

De La Cruz, M P; Del Caño, A and De La Cruz, E (2006) Downside risks in construction projects developed by the civil service: The case of Spain. Journal of Construction Engineering and Management, 132(8), pp. 844-852. ISSN 0733-9364

Desta, S; Root, D and Diederichs, C J (2006) The practice of project management office (PMO) concept within the German architect, engineer, contractor (AEC) sector. Journal of Engineering, Design and Technology, 4(1), pp. 46-59. ISSN 1726-0531

Dietzenbacher, E and Hoen, A (2006) Coefficient stability and predictability in input-output models: A comparative analysis for the Netherlands. Construction Management and Economics, 24(7), pp. 671-680. ISSN 1466433X

Dorji, K and Hadikusumo, B H W (2006) Safety management practices in the Bhutanese construction industry. Journal of Construction in Developing Countries, 11(2), pp. 53-75. ISSN 1823-6499

Dowdle, D L (2006) Engaging learners: The development of effective e-learning applications for students of the built environment. Architectural Engineering and Design Management, 2(1-2), pp. 31-48. ISSN 1745-2007

Doǧan, S Z; Arditi, D and Murat Günaydin, H (2006) Determining attribute weights in a CBR model for early cost prediction of structural systems. Journal of Construction Engineering and Management, 132(10), pp. 1092-1098. ISSN 0733-9364

Drejer, I and Vinding, A L (2006) Organisation, 'anchoring' of knowledge, and innovative activity in construction. Construction Management and Economics, 24(9), pp. 921-931. ISSN 1466433X

Drew, D S and Skitmore, M (2006) Testing Vickery's revenue equivalence theory in construction auctions. Journal of Construction Engineering and Management, 132(4), pp. 425-428. ISSN 0733-9364

Du, J J; Zhou, J; Liu, C and Picken, D (2006) Exploring turnover intention of construction managers in China. Journal of Construction Research, 7(1), pp. 191-205. ISSN 1609-9451

Duarte, J P and Correia, R (2006) Implementing a description grammar: Generating housing programs online. Construction Innovation, 6(4), pp. 203-216. ISSN 1471-4175

Dulaimi, M and Hartmann, A (2006) The role of organizational culture in motivating innovative behaviour in construction firms. Construction Innovation, 6(3), pp. 159-172. ISSN 1471-4175

Dulaimi, M; Khalfan, M M A and McDermott, P (2006) Innovating for supply chain integration within construction. Construction Innovation, 6(3), pp. 143-157. ISSN 1471-4175

Dulaimi, M; Stewart, I and Fenn, P (2006) Strategy: The motivation for innovation. Construction Innovation, 6(3), pp. 173-185. ISSN 1471-4175

Duncan, K; Philips, P and Prus, M (2006) Prevailing wage legislation and public school construction efficiency: A stochastic frontier approach. Construction Management and Economics, 24(6), pp. 625-634. ISSN 1466433X

Dzeng, R J (2006) Identifying a design management package to support concurrent design in building wafer fabrication facilities. Journal of Construction Engineering and Management, 132(6), pp. 606-614. ISSN 0733-9364

East, E W and Liu, L Y (2006) Multiproject planning and resource controls for facility management. Journal of Construction Engineering and Management, 132(12), pp. 1294-1305. ISSN 0733-9364

Eaton, D; Akbiyikli, R and Dickinson, M (2006) An evaluation of the stimulants and impediments to innovation within PFI/PPP projects. Construction Innovation, 6(2), pp. 63-67. ISSN 1471-4175

Edkins, A J and Smyth, H J (2006) The imperative of trust in PPPs: Evaluations from the provision of 'full service' contracts. Journal of Construction Procurement, 12(1),

Edwards, D J and Holt, G D (2006) Hand-arm vibration controls: A perspective based on performance and cost dimensions. Journal of Financial Management of Property and Construction, 11(1), pp. 21-32. ISSN 1366-4387

Edwards, D J and Holt, G D (2006) Hand-arm vibration exposure from construction tools: Results of a field study. Construction Management and Economics, 24(2), pp. 209-217. ISSN 01446193

Eeing, B T and Kruse, J B (2006) Valuing self-protection: Income and certification effects for safe rooms. Construction Management and Economics, 24(10), pp. 1057-1068. ISSN 1466433X

El Wardani, M A; Messner, J I and Horman, M J (2006) Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132(3), pp. 230-238. ISSN 0733-9364

El-Diraby, T A and Gill, S M (2006) A taxonomy for construction terms in privatized-infrastructure finance: Supporting semantic exchange of project risk information. Construction Management and Economics, 24(3), pp. 271-285. ISSN 01446193

El-Diraby, T E (2006) Web-services environment for collaborative management of product life-cycle costs. Journal of Construction Engineering and Management, 132(3), pp. 300-313. ISSN 0733-9364

El-Mashaleh, M; O'Brien, W J and Minchin Jr, R E (2006) Firm performance and information technology utilization in the construction industry. Journal of Construction Engineering and Management, 132(5), pp. 499-507. ISSN 0733-9364

Elazouni, A M (2006) Classifying construction contractors using unsupervised-learning neural networks. Journal of Construction Engineering and Management, 132(12), pp. 1242-1253. ISSN 0733-9364

Ellis Jr, R D and Lee, S H (2006) Measuring project level productivity on transportation projects. Journal of Construction Engineering and Management, 132(3), pp. 314-320. ISSN 0733-9364

Elmisalami, T; Walters, R and Jaselskis, E J (2006) Construction IT decision making using multiattribute utility theory for use in a laboratory information management system. Journal of Construction Engineering and Management, 132(12), pp. 1275-1283. ISSN 0733-9364

Emmitt, S (2006) Investigating the synergy between teaching and research in a teaching-led university: The case of an architectural technology undergraduate programme. Architectural Engineering and Design Management, 2(1-2), pp. 61-72. ISSN 1745-2007

Emmitt, S (2006) Selection and specification of building products: Implications for design managers. Architectural Engineering and Design Management, 2(3), pp. 176-186. ISSN 1745-2007

English, J; Haupt, T C and Smallwood, J J (2006) Women, construction and health and safety (H&S): South African and Tanzanian perspectives. Journal of Engineering, Design and Technology, 4(1), pp. 18-28. ISSN 1726-0531

Enshassi, A; Al-Hallaq, K and Mohamed, S (2006) Causes of contractor's business failure in developing countries: The case of Palestine. Journal of Construction in Developing Countries, 11(2), pp. 1-14. ISSN 1823-6499

Ezeldin, A S and Sharara, L M (2006) Neural networks for estimating the productivity of voncreting activities. Journal of Construction Engineering and Management, 132(6), pp. 650-656. ISSN 0733-9364

Fan, S L and Tserng, H P (2006) Object-oriented scheduling for repetitive projects with soft logics. Journal of Construction Engineering and Management, 132(1), pp. 35-48. ISSN 0733-9364

Fang, D; Chen, Y and Wong, L (2006) Safety climate in construction industry: A case study in Hong Kong. Journal of Construction Engineering and Management, 132(6), pp. 573-584. ISSN 0733-9364

Faridi, A S and El-Sayegh, S M (2006) Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24(11), pp. 1167-1176. ISSN 1466433X

Fergusson, H and Langford, D A (2006) Strategies for managing environmental issues in construction organizations. Engineering, Construction and Architectural Management, 13(2), pp. 171-185. ISSN 0969-9988

Fernie, S; Leiringer, R and Thorpe, T (2006) Change in construction: A critical perspective. Building Research & Information, 34(2), pp. 91-103. ISSN 0961-3218

Fikri Mohamed, S and Anumba, C J (2006) Potential for improving site management practices through knowledge management. Construction Innovation, 6(4), pp. 232-249. ISSN 1471-4175

Finne, C (2006) Publishing building product information: A value net perspective. Construction Innovation, 6(2), pp. 79-96. ISSN 1471-4175

Fong, P S W and Chu, L (2006) Exploratory study of knowledge sharing in contracting companies: A sociotechnical perspective. Journal of Construction Engineering and Management, 132(9), pp. 928-939. ISSN 0733-9364

Ford, D N and Bhargav, S (2006) Project management quality and the value of flexible strategies. Engineering, Construction and Architectural Management, 13(3), pp. 275-289. ISSN 0969-9988

Formoso, C T and Jobim, M S S (2006) Challenges in improving customer focus in small-sized house-building companies in Brazil. Journal of Construction in Developing Countries, 11(2), pp. 77-101. ISSN 1823-6499

Forsythe, P (2006) Consumer-perceived appearance tolerances in construction quality management. Engineering, Construction and Architectural Management, 13(3), pp. 307-318. ISSN 0969-9988

Fu, W K; Lo, H P and Drew, D S (2006) Collective learning, collective knowledge and learning networks in construction. Construction Management and Economics, 24(10), pp. 1019-1028. ISSN 1466433X

Galloway, P D (2006) Comparative study of university courses on critical-path method scheduling. Journal of Construction Engineering and Management, 132(7), pp. 712-722. ISSN 0733-9364

Galloway, P D (2006) Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of Construction Engineering and Management, 132(7), pp. 697-711. ISSN 0733-9364

Ganesan, S and Kelsey, J (2006) Technology transfer: International collaboration in Sri Lanka. Construction Management and Economics, 24(7), pp. 743-753. ISSN 1466433X

Gao, Z; Walters, R C; Jaselskis, E J and Wipf, T J (2006) Approaches to improving the quality of construction drawings from owner's perspective. Journal of Construction Engineering and Management, 132(11), pp. 1187-1192. ISSN 0733-9364

Garcia, C; Huebschman, R; Abraham, D M and Bullock, D M (2006) Using GPS to measure the impact of construction activities on rural interstates. Journal of Construction Engineering and Management, 132(5), pp. 508-515. ISSN 0733-9364

Gething, B and Bordass, B (2006) Rapid assessment checklist for sustainable buildings. Building Research & Information, 34(4), pp. 416-426. ISSN 0961-3218

Gillott, M; Holland, R; Riffat, S and Fitchett, J A (2006) Post-occupancy evaluation of space use in a dwelling using RFID tracking. Architectural Engineering and Design Management, 2(4), pp. 273-288. ISSN 1745-2007

Givoni, B; Khedari, J; Wong, N H; Feriadi, H and Noguchi, M (2006) Thermal sensation responses in hot, humid climates: Effects of humidity. Building Research & Information, 34(5), pp. 496-506. ISSN 0961-3218

Gluch, P and Stenberg, A C (2006) How do trade media influence green building practice? Building Research & Information, 34(2), pp. 104-117. ISSN 0961-3218

Gormley, M and Campbell, D P (2006) Modelling water reduction effects: Method and implications for horizontal drainage. Building Research & Information, 34(2), pp. 131-144. ISSN 0961-3218

Greenwood, D J and Yates, D J (2006) The determinants of successful partnering: A transaction cost perspective. Journal of Construction Procurement, 12(1),

Gribble, S J; Scott, D; Mawdesley, M and Al-Jibouri, S (2006) Learning to be real engineers: The dam game simulation. Architectural Engineering and Design Management, 2(1-2), pp. 101-114. ISSN 1745-2007

Grimsrud, D; Bridges, B and Schulte, R (2006) Continuous measurements of air quality parameters in schools. Building Research & Information, 34(5), pp. 447-458. ISSN 0961-3218

Grisham, T and Walker, D H T (2006) Nurturing a knowledge environment for international construction organizations through communities of practice. Construction Innovation, 6(4), pp. 217-231. ISSN 1471-4175

Grosskopf, K R and Kibert, C J (2006) Economic incentive framework for sustainable energy use in us residential construction. Construction Management and Economics, 24(8), pp. 839-846. ISSN 1466433X

Gunderson, D E and Gloeckner, G W (2006) Needs assessment: Construction management doctoral programs in the United States. International Journal of Construction Education and Research, 2(3), pp. 169-180. ISSN 1557-8771

Habisreutinger, P and Gunderson, D E (2006) Real estate reuse opportunities within the regenesis project area: A case study. International Journal of Construction Education and Research, 2(1), pp. 53-63. ISSN 1557-8771

Haldenwang, R; Slatter, P and Pearce, C (2006) Integration of project management skills to manage a fourth year research project. Journal of Engineering, Design and Technology, 4(1), pp. 60-70. ISSN 1726-0531

Hardie, M; Miller, G; Manley, K and McFallan, S (2006) Innovation performance and its impact on profitability among different sectors in the Australian construction industry. Construction Economics and Building, 6(1), pp. 1-11. ISSN 2204-9029

Hare, B; Cameron, I and Roy Duff, A (2006) Exploring the integration of health and safety with pre-construction planning. Engineering, Construction and Architectural Management, 13(5), pp. 438-450. ISSN 0969-9988

Hartmann, A (2006) The context of innovation management in construction firms. Construction Management and Economics, 24(6), pp. 567-578. ISSN 1466433X

Hassanein, A A G and Afify, H M F (2006) Contractors' risk identification behaviour: A case study. Journal of Construction Procurement, 12(1),

Hassanein, A A G and Khalil, B N L (2006) Building Egypt 1: a general indicator cost index for the Egyptian construction industry. Engineering, Construction and Architectural Management, 13(5), pp. 463-480. ISSN 0969-9988

Hassanein, A A G and Khalil, B N L (2006) Developing general indicator cost indices for the Egyptian construction industry. Journal of Financial Management of Property and Construction, 11(3), pp. 181-194. ISSN 1366-4387

Hawk, D (2006) Conditions of success: A platform for international construction development. Construction Management and Economics, 24(7), pp. 735-742. ISSN 1466433X

Hegab, M; Smith, G R and Salem, O M (2006) Soil penetration modeling in microtunneling projects. Journal of Construction Engineering and Management, 132(6), pp. 598-605. ISSN 0733-9364

Hegazy, T (2006) Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132(1), pp. 26-34. ISSN 0733-9364

Hepner, C M and Boser, R A (2006) Architects' perceptions of LEED indoor environmental quality checklist items on employee productivity. International Journal of Construction Education and Research, 2(3), pp. 193-208. ISSN 1557-8771

Hinze, J; Devenport, J N and Giang, G (2006) Analysis of construction worker injuries that do not result in lost time. Journal of Construction Engineering and Management, 132(3), pp. 321-326. ISSN 0733-9364

Ho, S P (2006) Model for financial renegotiation in public-private partnership projects and its policy implications: Game theoretic view. Journal of Construction Engineering and Management, 132(7), pp. 678-688. ISSN 0733-9364

Holley, P W (2006) Effectiveness of it-based course material: A case study in publishing and using a digital textbook for construction surveying. International Journal of Construction Education and Research, 2(1), pp. 29-41. ISSN 1557-8771

Horman, M J; Orosz, M P and Riley, D R (2006) Sequence planning for electrical construction. Journal of Construction Engineering and Management, 132(4), pp. 363-372. ISSN 0733-9364

Hoxley, M and Rowsell, R (2006) Using video in the construction technology classroom: Encouraging active learning. Architectural Engineering and Design Management, 2(1-2), pp. 115-122. ISSN 1745-2007

Hsieh, H Y and Forster, J (2006) Residential construction quality and production levels in Taiwan. Engineering, Construction and Architectural Management, 13(5), pp. 502-520. ISSN 0969-9988

Huang, R Y (2006) A performance-based bridge LCCA model using visual inspection inventory data. Construction Management and Economics, 24(10), pp. 1069-1081. ISSN 1466433X

Huang, R Y and Sun, K S (2006) Non-unit-based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6), pp. 585-597. ISSN 0733-9364

Huang, X and Hinze, J (2006) Owner's role in construction safety. Journal of Construction Engineering and Management, 132(2), pp. 164-173. ISSN 0733-9364

Huang, X and Hinze, J (2006) Owner's role in construction safety: Guidance model. Journal of Construction Engineering and Management, 132(2), pp. 174-181. ISSN 0733-9364

Huang, Y C (2006) Graphical-based multistage scheduling method for RC buildings. Construction Management and Economics, 24(1), pp. 5-18. ISSN 01446193

Huang, Y L and Chou, S P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(4), pp. 379-389. ISSN 01446193

Hui, E C M (2006) Intra-urban residential mobility and property markets: Theory and evidence. Journal of Financial Management of Property and Construction, 11(2), pp. 117-130. ISSN 1366-4387

Hutchings, D M and Eggett, D L (2006) Management practices as predictors of success for small-volume home builders in the United States. International Journal of Construction Education and Research, 2(3), pp. 217-230. ISSN 1557-8771

Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(6), pp. 591-601. ISSN 1466433X

Hyari, K and El-Rayes, K (2006) Lighting requirements for nighttime highway construction. Journal of Construction Engineering and Management, 132(5), pp. 435-443. ISSN 0733-9364

Ibrahim, A D; Price, A D F and Dainty, A R J (2006) The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria. Journal of Financial Management of Property and Construction, 11(3), pp. 149-164. ISSN 1366-4387

Ibrahim, A D; Price, A D F and Dainty, A R J (2006) An analysis of success factors for public private partnerships in infrastructure projects in Nigeria. Journal of Construction Procurement, 12(1),

Igo, T and Skitmore, M (2006) Diagnosing the organizational culture of an Australian engineering consultancy using the competing values framework. Construction Innovation, 6(2), pp. 121-139. ISSN 1471-4175

Ilozor, B D and Ilozor, D B (2006) Open-planning concepts and effective facilities management of commercial buildings. Engineering, Construction and Architectural Management, 13(4), pp. 396-412. ISSN 0969-9988

Ingirige, B and Sexton, M (2006) Alliances in construction: Investigating initiatives and barriers for long-term collaboration. Engineering, Construction and Architectural Management, 13(5), pp. 521-535. ISSN 0969-9988

Irizarry, J and Abraham, D M (2006) Assessment of risk perception of ironworkers. Journal of Construction Research, 7(1), pp. 111-132. ISSN 1609-9451

Ive, G (2006) Re-examining the costs and value ratios of owning and occupying buildings. Building Research & Information, 34(3), pp. 230-245. ISSN 0961-3218

Iyer, K C and Jha, K N (2006) Critical factors affecting schedule performance: Evidence from Indian construction projects. Journal of Construction Engineering and Management, 132(8), pp. 871-881. ISSN 0733-9364

Jaśkowski, P and Sobotka, A (2006) Scheduling construction projects using evolutionary algorithm. Journal of Construction Engineering and Management, 132(8), pp. 861-870. ISSN 0733-9364

Jefferies, M (2006) Critical success factors of public private sector partnerships: A case study of the sydney superdome. Engineering, Construction and Architectural Management, 13(5), pp. 451-462. ISSN 0969-9988

Jeong, K S; Kagioglou, M; Haigh, R; Amaratunga, D and Siriwardena, M L (2006) Embedding good practice sharing within process improvement. Engineering, Construction and Architectural Management, 13(1), pp. 62-81. ISSN 0969-9988

Jha, K N and Iyer, C K (2006) What attributes should a project coordinator possess? Construction Management and Economics, 24(9), pp. 977-988. ISSN 1466433X

Ji, X L; Lou, W Z; Dai, Z Z; Wang, B G and Liu, S Y (2006) Predicting thermal comfort in Shanghai's non-air-conditioned buildings. Building Research & Information, 34(5), pp. 507-514. ISSN 0961-3218

Johansen, E and Wilson, B (2006) Investigating first planning in construction. Construction Management and Economics, 24(12), pp. 1305-1314. ISSN 1466433X

Johnson, C; Lizarralde, G and Davidson, C H (2006) A systems view of temporary housing projects in post-disaster reconstruction. Construction Management and Economics, 24(4), pp. 367-378. ISSN 01446193

Johnsson, H; Janols, H and Stehn, L (2006) 3D computer visualization in timber construction: some important parameters. Architectural Engineering and Design Management, 2(3), pp. 161-175. ISSN 1745-2007

Kaatz, E; Root, D S; Bowen, P A and Hill, R C (2006) Advancing key outcomes of sustainability building assessment. Building Research & Information, 34(4), pp. 308-320. ISSN 0961-3218

Kaiser, M J (2006) Offshore decommissioning cost estimation in the gulf of Mexico. Journal of Construction Engineering and Management, 132(3), pp. 249-258. ISSN 0733-9364

Kaiser, M J and Lledare, W O (2006) The gulf of Mexico decommissioning market. Journal of Construction Engineering and Management, 132(8), pp. 815-826. ISSN 0733-9364

Kale, S and Arditi, D (2006) Diffusion of ISO 9000 certification in the precast concrete industry. Construction Management and Economics, 24(5), pp. 485-495. ISSN 1466433X

Kandil, A and El-Rayes, K (2006) Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. Journal of Construction Engineering and Management, 132(5), pp. 491-498. ISSN 0733-9364

Karim, K; Marosszeky, M and Davis, S (2006) Managing subcontractor supply chain for quality in construction. Engineering, Construction and Architectural Management, 13(1), pp. 27-42. ISSN 0969-9988

Kassab, M; Hipel, K and Hegazy, T (2006) Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132(10), pp. 1043-1052. ISSN 0733-9364

Kehinde, J O and Mosaku, T O (2006) An empirical study of assets structure of building construction contractors in Nigeria. Engineering, Construction and Architectural Management, 13(6), pp. 634-644. ISSN 0969-9988

Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction. Journal of Financial Management of Property and Construction, 11(2), pp. 75-90. ISSN 1366-4387

Khalafallah, A and El-Rayes, K (2006) Minimizing construction-related hazards in airport expansion projects. Journal of Construction Engineering and Management, 132(6), pp. 562-572. ISSN 0733-9364

Khalfan, M M A and McDermott, P (2006) Once unthought, now the best practice within the construction sector. Journal of Construction Procurement, 12(1),

Kim, H J and Reinschmidt, K F (2006) A dynamic competition model for construction contractors. Construction Management and Economics, 24(9), pp. 955-965. ISSN 1466433X

Kohler, N (2006) A European perspective on the Pearce report; policy and research. Building Research & Information, 34(3), pp. 287-294. ISSN 0961-3218

Kolera, B T and Bernold, L E (2006) Intelligent utility locating tool for excavators. Journal of Construction Engineering and Management, 132(9), pp. 919-927. ISSN 0733-9364

Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029

Koskela, L and Ballard, G (2006) Should project management be based on theories of economics or production? Building Research & Information, 34(2), pp. 154-163. ISSN 0961-3218

Kumaraswamy, M M (2006) Accelerating construction industry development. Journal of Construction in Developing Countries, 11(1), pp. 73-94. ISSN 1823-6499

Kumaraswamy, M M; Miller, C J; Rahman, M M; Pickernell, D G; Ng, S T and Wong, I P Y (2006) Developing web-based tools for teaching, training, learning and development: The role of academic institutions. Architectural Engineering and Design Management, 2(1-2), pp. 123-135. ISSN 1745-2007

Lai, C M and Chiang, C M (2006) How phase change materials affect thermal performance: Hollow bricks. Building Research & Information, 34(2), pp. 118-130. ISSN 0961-3218

Lam, E W M; Chan, A P C and Chan, D M W (2006) Drivers for design-build applications in the public sector of Hong Kong. Journal of Construction Procurement, 12(1),

Lapinski, A R; Horman, M J and Riley, D R (2006) Lean processes for sustainable project delivery. Journal of Construction Engineering and Management, 132(10), pp. 1083-1091. ISSN 0733-9364

Larsson, B; Sundqvist, J and Emmitt, S (2006) Component manufacturers' perceptions of managing innovation. Building Research & Information, 34(6), pp. 552-564. ISSN 0961-3218

Lee, D E and Arditi, D (2006) Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), pp. 268-277. ISSN 0733-9364

Lee, D E and Arditi, D (2006) Total quality performance of design/build firms using quality function deployment. Journal of Construction Engineering and Management, 132(1), pp. 49-57. ISSN 0733-9364

Lee, D E and Shi, J J (2006) Construction business automation system. Journal of Construction Engineering and Management, 132(1), pp. 88-96. ISSN 0733-9364

Lee, E B; Lee, H and Harvey, J T (2006) Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study. Journal of Construction Engineering and Management, 132(5), pp. 465-472. ISSN 0733-9364

Lee, S; Peña-Mora, F and Park, M (2006) Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects. Journal of Construction Engineering and Management, 132(5), pp. 452-464. ISSN 0733-9364

Leiringer, R (2006) Technological innovation in PPPs: Incentives, opportunities and actions. Construction Management and Economics, 24(3), pp. 301-308. ISSN 01446193

Leishman, C and Warren, F (2006) Private housing design customization through house type substitution. Construction Management and Economics, 24(2), pp. 149-158. ISSN 01446193

Leung, M Y; Liu, A M M and Wong, M M K (2006) Impact of stress-coping behaviour on estimation performance. Construction Management and Economics, 24(1), pp. 55-67. ISSN 01446193

Lewis, T M and Hosein, R (2006) An estimation of the size of the hidden labour force in construction in Trinidad and Tobago. Construction Management and Economics, 24(8), pp. 805-815. ISSN 1466433X

Li, J; Moselhi, O and Alkass, S (2006) Forecasting project status by using fuzzy logic. Journal of Construction Engineering and Management, 132(11), pp. 1193-1202. ISSN 0733-9364

Li, J; Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(3), pp. 242-253. ISSN 0969-9988

Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X

Ling, F Y Y; Ibbs, C W and Hoo, W Y (2006) Determinants of international architectural, engineering, and construction firms' project success in China. Journal of Construction Engineering and Management, 132(2), pp. 206-214. ISSN 0733-9364

Lingard, H and Francis, V (2006) Does a supportive work environment moderate the relationship between work-family conflict and burnout among construction professionals? Construction Management and Economics, 24(2), pp. 185-196. ISSN 01446193

Lisø, K R (2006) Integrated approach to risk management of future climate change impacts. Building Research & Information, 34(1), pp. 1-10. ISSN 0961-3218

Lisø, K R; Hygen, H O; Kvande, T and Thue, J V (2006) Decay potential in wood structures using climate data. Building Research & Information, 34(6), pp. 546-551. ISSN 0961-3218

Liu, A M M and Fang, Z (2006) A power-based leadership approach to project management. Construction Management and Economics, 24(5), pp. 497-507. ISSN 1466433X

Liu, A M M; Shuibo, Z and Meiyung, L (2006) A framework for assessing organisational culture of Chinese construction enterprises. Engineering, Construction and Architectural Management, 13(4), pp. 327-342. ISSN 0969-9988

Liu, Y; Prasad, D; Li, J; Fu, Y and Liu, J (2006) Developing regionally specific environmental building tools for China. Building Research & Information, 34(4), pp. 372-386. ISSN 0961-3218

Lo, T Y; Fung, I W H and Tung, K C F (2006) Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management, 132(6), pp. 636-649. ISSN 0733-9364

Lobo, Y and Wilkinson, S (2006) The effects of occupational licensing on skills needs in the building industry: Evidence from New Zealand. Construction Economics and Building, 6(2), pp. 55-63. ISSN 2204-9029

Louzolo-Kimbembé, P and Pettang, C (2006) A new approach for construction planning in the developing countries: the sub-structure chaining diagram (SSCD). Journal of Construction Research, 7(1), pp. 159-176. ISSN 1609-9451

Lowe, D J (2006) Supervised work experience: The learning climate of construction companies and the factors that influence student experience. Architectural Engineering and Design Management, 2(1-2), pp. 49-60. ISSN 1745-2007

Lowe, D J; Emsley, M W and Harding, A (2006) Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7), pp. 750-758. ISSN 0733-9364

Lowe, D J; Emsley, M W and Harding, A (2006) Relationships between total construction cost and project strategic, site related and building definition variable. Journal of Financial Management of Property and Construction, 11(3), pp. 165-180. ISSN 1366-4387

Lowe, R (2006) Defining absolute environmental limits for the built environment. Building Research & Information, 34(4), pp. 405-415. ISSN 0961-3218

Lu, M; Poon, C S and Wong, L C (2006) Application framework for mapping and simulation of waste handling processes in construction. Journal of Construction Engineering and Management, 132(11), pp. 1212-1221. ISSN 0733-9364

Lu, S L and Sexton, M (2006) Innovation in small construction knowledge-intensive professional service firms: A case study of an architectural practice. Construction Management and Economics, 24(12), pp. 1269-1282. ISSN 1466433X

Lucko, G; Anderson-Cook, C M and Vorster, M C (2006) Statistical considerations for predicting residual value of heavy equipment. Journal of Construction Engineering and Management, 132(7), pp. 723-732. ISSN 0733-9364

Luu, D and Sher, W (2006) Construction tender subcontract selection using case-based reasoning. Construction Economics and Building, 6(2), pp. 32-43. ISSN 2204-9029

Lützkendorf, T and Lorenz, D (2006) Using an integrated performance approach in building assessment tools. Building Research & Information, 34(4), pp. 334-356. ISSN 0961-3218

Lœdre, O; Austeng, K; Haugen, T I and Klakegg, O J (2006) Procurement routes in public building and construction projects. Journal of Construction Engineering and Management, 132(7), pp. 689-696. ISSN 0733-9364

Macmillan, S (2006) Added value of good design. Building Research & Information, 34(3), pp. 257-271. ISSN 0961-3218

Mahdi, I M; Al-Reshaid, K and Fereig, S M (2006) Optimum house delivery decision model from the government's and recipients' point-of-view. Engineering, Construction and Architectural Management, 13(4), pp. 413-430. ISSN 0969-9988

Maheswari, J U; Varghese, K and Sridharan, T (2006) Application of dependency structure matrix for activity sequencing in concurrent engineering projects. Journal of Construction Engineering and Management, 132(5), pp. 482-490. ISSN 0733-9364

Majdalani, Z; Ajam, M and Mezher, T (2006) Sustainability in the construction industry: A Lebanese case study. Construction Innovation, 6(1), pp. 33-46. ISSN 1471-4175

Malmqvist, T and Glaumann, M (2006) Selecting problem-related environmental indicators for housing management. Building Research & Information, 34(4), pp. 321-333. ISSN 0961-3218

Manley, K (2006) The innovation competence of repeat public sector clients in the Australian construction industry. Construction Management and Economics, 24(12), pp. 1295-1304. ISSN 1466433X

Manley, K and McFallan, S (2006) Exploring the drivers of firm-level innovation in the construction industry. Construction Management and Economics, 24(9), pp. 911-920. ISSN 1466433X

Manoliadis, O; Tsolas, I and Nakou, A (2006) Sustainable construction and drivers of change in Greece: A Delphi study. Construction Management and Economics, 24(2), pp. 113-120. ISSN 01446193

Manowong, E and Ogunlana, S O (2006) Public hearings in Thailand's infrastructure projects: Effective participations? Engineering, Construction and Architectural Management, 13(4), pp. 343-363. ISSN 0969-9988

Marasini, R and Dawood, N (2006) Innovative managerial control system (IMCS): An application in precast concrete building products industry. Construction Innovation, 6(2), pp. 97-120. ISSN 1471-4175

Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175

Mattar, M H and Cheah, C Y J (2006) Valuing large engineering projects under uncertainty: Private risk effects and real options. Construction Management and Economics, 24(8), pp. 847-860. ISSN 1466433X

Mbachu, J and Nkado, R (2006) Conceptual framework for assessment of client needs and satisfaction in the building development process. Construction Management and Economics, 24(1), pp. 31-44. ISSN 01446193

McCann, P (2006) On the supply-side determinants of regional growth. Construction Management and Economics, 24(7), pp. 681-693. ISSN 1466433X

McConnell, C W; Gloeckner, G and Gilley, J (2006) Predictors of work injuries: A quantitative exploration of level of english proficiency as a predictor of work injuries in the construction industry. International Journal of Construction Education and Research, 2(1), pp. 3-28. ISSN 1557-8771

McDermott, P and Khalfan, M M A (2006) Achieving supply chain integration within construction industry. Construction Economics and Building, 6(2), pp. 44-54. ISSN 2204-9029

Meeampol, S and Ogunlan, S O (2006) Factors affecting cost and time performance on highway construction projects: Evidence from Thailand. Journal of Financial Management of Property and Construction, 11(1), pp. 3-20. ISSN 1366-4387

Menches, C L and Hanna, A S (2006) Conceptual planning process for electrical construction. Journal of Construction Engineering and Management, 132(12), pp. 1306-1313. ISSN 0733-9364

Menches, C L and Hanna, A S (2006) Quantitative measurement of successful performance from the project manager's perspective. Journal of Construction Engineering and Management, 132(12), pp. 1284-1293. ISSN 0733-9364

Morledge, R and Adnan, H (2006) Critical success factors in construction joint venture projects in Malaysia. Journal of Construction Procurement, 12(1),

Moschandreas, D J; Yoon, S H and Demirev, D (2006) Validation of the indoor environmental quality conceptual model. Building Research & Information, 34(5), pp. 483-495. ISSN 0961-3218

Moussa, M; Ruwanpura, J and Jergeas, G (2006) Decision tree modeling using integrated multilevel stochastic networks. Journal of Construction Engineering and Management, 132(12), pp. 1254-1266. ISSN 0733-9364

Mullens, M A and Arif, M (2006) Structural insulated panels: Impact on the residential construction process. Journal of Construction Engineering and Management, 132(7), pp. 786-794. ISSN 0733-9364

Muya, M; Price, A D F and Edum-Fotwe, F T (2006) Overview of funding for construction craft skills training in Sub-Saharan Africa: A case study of Zambia. Construction Management and Economics, 24(2), pp. 197-208. ISSN 01446193

Na, L J; Ofori, G and Park, M (2006) Stimulating construction innovation in Singapore through the national system of innovation. Journal of Construction Engineering and Management, 132(10), pp. 1069-1082. ISSN 0733-9364

Nassar, K M and Hegab, M Y (2006) Developing a complexity measure for project schedules. Journal of Construction Engineering and Management, 132(6), pp. 554-561. ISSN 0733-9364

Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X

Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), pp. 1225-1229. ISSN 1466433X

Navon, R and Kolton, O (2006) Model for automated monitoring of fall hazards in building construction. Journal of Construction Engineering and Management, 132(7), pp. 733-740. ISSN 0733-9364

Ndekugri, I and Russell, V (2006) Disputing the existence of a dispute as a strategy for avoiding construction adjudication. Engineering, Construction and Architectural Management, 13(4), pp. 380-395. ISSN 0969-9988

Nepal, M P; Park, M and Son, B (2006) Effects of schedule pressure on construction performance. Journal of Construction Engineering and Management, 132(2), pp. 182-188. ISSN 0733-9364

Nesan, L J (2006) Project finance model for small contractors in USA. Construction Economics and Building, 6(1), pp. 25-41. ISSN 2204-9029

Ng, S T and Wong, Y M W (2006) Adopting non-privately funded public-private partnerships in maintenance projects: A case study in Hong Kong. Engineering, Construction and Architectural Management, 13(2), pp. 186-200. ISSN 0969-9988

Nielsen, Y; Bouchlaghem, D; Koseoglu, O O; Erdogan, B and Anumba, C J (2006) Integration of visualisation & mobile technologies in construction. Journal of Construction Research, 7(1), pp. 227-246. ISSN 1609-9451

Nitithamyong, P and Skibniewski, M J (2006) Success/failure factors and performance measures of web-based construction project management systems: Professionals' viewpoint. Journal of Construction Engineering and Management, 132(1), pp. 80-87. ISSN 0733-9364

Nuntasunti, S and Bernold, L E (2006) Experimental assessment of wireless construction technologies. Journal of Construction Engineering and Management, 132(9), pp. 1009-1018. ISSN 0733-9364

O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364

Oei, F J and Ogunlana, S O (2006) Assessment of the development role of a statutory body from a customer perspective: A relationship marketing approach. Journal of Construction in Developing Countries, 11(2), pp. 31-52. ISSN 1823-6499

Ofori, G (2006) Revaluing construction in developing countries: A research agenda. Journal of Construction in Developing Countries, 11(1), pp. 1-16. ISSN 1823-6499

Ogunsemi, D R and Aje, I O (2006) A model for contractors' selection in Nigeria. Journal of Financial Management of Property and Construction, 11(1), pp. 33-44. ISSN 1366-4387

Ogunsemi, D R and Jagboro, G O (2006) Time-cost model for building projects in Nigeria. Construction Management and Economics, 24(3), pp. 253-258. ISSN 01446193

Ok, S C and Sinha, S K (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), pp. 1029-1044. ISSN 1466433X

Oloke, D; Edwards, D J; Wright, B and Love, P E D (2006) A web-based information management system for predicting the breakdown of off-highway plant. Journal of Engineering, Design and Technology, 4(1), pp. 29-45. ISSN 1726-0531

Othman, A A; Torrance, J V and Hamid, M A (2006) Factors influencing the construction time of civil engineering projects in Malaysia. Engineering, Construction and Architectural Management, 13(5), pp. 481-501. ISSN 0969-9988

Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988

Oyegoke, A S (2006) Construction industry overview in the UK, US, Japan and Finland: a comparative analysis. Journal of Construction Research, 7(1), pp. 13-31. ISSN 1609-9451

Oyetunji, A A and Anderson, S D (2006) Relative effectiveness of project delivery and contract strategies. Journal of Construction Engineering and Management, 132(1), pp. 3-13. ISSN 0733-9364

Ozorhon, B; Dikmen, I and Birgonul, M T (2006) Case-based reasoning model for international market selection. Journal of Construction Engineering and Management, 132(9), pp. 940-948. ISSN 0733-9364

Pan, N F (2006) Evaluation of building performance using fuzzy FTA. Construction Management and Economics, 24(12), pp. 1241-1252. ISSN 1466433X

Peansupap, V and Walker, D H T (2006) Innovation diffusion at the implementation stage of a construction project: A case study of information communication technology. Construction Management and Economics, 24(3), pp. 321-332. ISSN 01446193

Pearce, D (2006) Is the construction sector sustainable? Definitions and reflections. Building Research & Information, 34(3), pp. 201-207. ISSN 0961-3218

Perng, Y H; Juan, Y K and Chien, S F (2006) Exploring the bidding situation for economically most advantageous tender projects using a bidding game. Journal of Construction Engineering and Management, 132(10), pp. 1037-1042. ISSN 0733-9364

Perry, L J (2006) Industrial disputes in the construction sector. Construction Economics and Building, 6(1), pp. 42-50. ISSN 2204-9029

Persily, A K; Gorfain, J and Brunner, G (2006) Survey of ventilation rates in office buildings. Building Research & Information, 34(5), pp. 459-466. ISSN 0961-3218

Perttula, P; Korhonen, P; Lehtelä, J; Rasa, P L; Kitinoja, J P; Mäkimattila, S and Leskinen, T (2006) Improving the safety and efficiency of materials transfer at a construction site by using an elevator. Journal of Construction Engineering and Management, 132(8), pp. 836-843. ISSN 0733-9364

Pheng, L S and Hongbin, J (2006) Analysing ownership, locational and internalization advantages of Chinese construction mncs using rough sets analysis. Construction Management and Economics, 24(11), pp. 1149-1165. ISSN 1466433X

Phua, F T T (2006) Predicting construction firm performance: An empirical assessment of the differential impact between industry- and firm-specific factors. Construction Management and Economics, 24(3), pp. 309-320. ISSN 01446193

Phua, F T T (2006) When is construction partnering likely to happen? An empirical examination of the role of institutional norms. Construction Management and Economics, 24(6), pp. 615-624. ISSN 1466433X

Pietroforte, R and Gregori, T (2006) Does volume follow share? The case of the Danish construction industry. Construction Management and Economics, 24(7), pp. 711-715. ISSN 1466433X

Pocock, J B; Kuennen, S T; Gambatese, J and Rauschkolb, J (2006) Constructability state of practice report. Journal of Construction Engineering and Management, 132(4), pp. 373-383. ISSN 0733-9364

Poh, Y P and Tah, J H M (2006) Integrated duration-cost influence network for modelling risk impacts on construction tasks. Construction Management and Economics, 24(8), pp. 861-868. ISSN 1466433X

Polat, G; Arditi, D; Ballard, G and Mungen, U (2006) Economics of on-site vs off-site fabrication of rebar. Construction Management and Economics, 24(11), pp. 1185-1198. ISSN 1466433X

Price, A D F and Chahal, K (2006) A strategic framework for change management. Construction Management and Economics, 24(3), pp. 237-251. ISSN 01446193

Pryke, S and Pearson, S (2006) Project governance: Case studies on financial incentives. Building Research & Information, 34(6), pp. 534-545. ISSN 0961-3218

Puddicombe, M S (2006) The limitations of planning: The importance of learning. Journal of Construction Engineering and Management, 132(9), pp. 949-955. ISSN 0733-9364

Pun, S K; Liu, C and Langston, C (2006) Case study of demolition costs of residential buildings. Construction Management and Economics, 24(9), pp. 967-976. ISSN 1466433X

Raidén, A B; Dainty, A R J and Neale, R H (2006) Balancing employee needs, project requirements and organisational priorities in team deployment. Construction Management and Economics, 24(8), pp. 883-895. ISSN 1466433X

Ramsaran, R and Hosein, R (2006) Growth, employment and the construction industry in Trinidad and Tobago. Construction Management and Economics, 24(5), pp. 465-474. ISSN 1466433X

Rashid Abdul Aziz, A; Shiew yi, H and Jaafar, M (2006) Competitive resources of private housing developers: The Malaysian perspective. Journal of Engineering, Design and Technology, 4(1), pp. 71-80. ISSN 1726-0531

Rees, S W; Zhou, Z and Thomas, H R (2006) Multidimensional simulation of earth-contact heat transfer. Building Research & Information, 34(6), pp. 565-572. ISSN 0961-3218

Reinschmidt, K and Trejo, D (2006) Economic value of building faster. Journal of Construction Engineering and Management, 132(7), pp. 759-766. ISSN 0733-9364

Rezgui, Y and Zarli, A (2006) Paving the way to the vision of digital construction: A strategic roadmap. Journal of Construction Engineering and Management, 132(7), pp. 767-776. ISSN 0733-9364

Robert, J; Moulet, L; Lizarralde, G; Davidson, C H; Nie, J and da Sylva, L (2006) Finding out: A system for providing rapid and reliable answers to questions in the construction sector. Construction Innovation, 6(4), pp. 250-261. ISSN 1471-4175

Ross, A D and Goulding, J S (2006) The construction estimator's approach to the collection and assessment of supply chain price information. Journal of Construction Procurement, 12(1),

Roulet, C A; Flourentzou, F; Foradini, F; Bluyssen, P; Cox, C and Aizlewood, C (2006) Multicriteria analysis of health, comfort and energy efficiency in buildings. Building Research & Information, 34(5), pp. 475-482. ISSN 0961-3218

Roulet, C A; Johner, N; Foradini, F; Bluyssen, P; Cox, C; De Oliveira Fernandes, E; Müller, B and Aizlewood, C (2006) Perceived health and comfort in relation to energy use and building characteristics. Building Research & Information, 34(5), pp. 467-474. ISSN 0961-3218

Rowlinson, S and Croker, N (2006) IT sophistication, performance and progress towards formal electronic communication in the Hong Kong construction industry. Engineering, Construction and Architectural Management, 13(2), pp. 154-170. ISSN 0969-9988

Ruddock, L and Lopes, J (2006) The construction sector and economic development: The 'Bon curve'. Construction Management and Economics, 24(7), pp. 717-723. ISSN 1466433X

Rustom, R N (2006) Formulation of generic simulation models for analyzing construction claims. Construction Economics and Building, 6(2), pp. 11-19. ISSN 2204-9029

Rustom, R N and Amer, M I (2006) Modeling the factors affecting quality in building construction projects in Gaza Strip. Journal of Construction Research, 7(1), pp. 33-47. ISSN 1609-9451

Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218

Sacks, R and Harel, M (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management and Economics, 24(8), pp. 869-881. ISSN 1466433X

Sadeghpour, F; Moselhi, O and Alkass, S T (2006) Computer-aided site layout planning. Journal of Construction Engineering and Management, 132(2), pp. 143-151. ISSN 0733-9364

Sandhu, M and Helo, P (2006) A network approach to project business analysis. Engineering, Construction and Architectural Management, 13(6), pp. 600-615. ISSN 0969-9988

Sebastian, R (2006) Evaluating a proposed approach for managing collaborative design in the conceptual design phase. Architectural Engineering and Design Management, 2(3), pp. 216-224. ISSN 1745-2007

Sexton, M; Barrett, P and Aouad, G (2006) Motivating small construction companies to adopt new technology. Building Research & Information, 34(1), pp. 11-22. ISSN 0961-3218

Sha, K; Song, T; Qi, X and Luo, N (2006) Rethinking China's urbanization: An institutional innovation perspective. Building Research & Information, 34(6), pp. 573-583. ISSN 0961-3218

Sharma, V; Al-Hussein, M and Abourizk, S M (2006) Residential construction lot grading approval process optimization: Case study of city of Edmonton. Journal of Construction Engineering and Management, 132(12), pp. 1225-1233. ISSN 0733-9364

Shash, A A and Ahcom, J (2006) Organizational aspects of planning and scheduling subsystem. Journal of Construction Research, 7(1), pp. 247-265. ISSN 1609-9451

Shen, L Y; Lu, W S and Yam, M C H (2006) Contractor key competitiveness indicators: A China study. Journal of Construction Engineering and Management, 132(4), pp. 416-424. ISSN 0733-9364

Shen, L Y; Zhao, Z Y and Drew, D S (2006) Strengths, weaknesses, opportunities, and threats for foreign-invested construction enterprises: A China study. Journal of Construction Engineering and Management, 132(9), pp. 966-975. ISSN 0733-9364

Shiers, D; Rapson, D; Roberts, C and Keeping, M (2006) Sustainable construction: The development and evaluation of an environmental profiling system for construction products. Construction Management and Economics, 24(11), pp. 1177-1184. ISSN 1466433X

Shih, N J and Huang, S T (2006) 3D scan information management system for construction management. Journal of Construction Engineering and Management, 132(2), pp. 134-142. ISSN 0733-9364

Shipworth, D (2006) Qualitative modelling of sustainable energy scenarios: An extension of the bon qualitative input-output model. Construction Management and Economics, 24(7), pp. 695-703. ISSN 1466433X

Shohet, I M (2006) Key performance indicators for strategic healthcare facilities maintenance. Journal of Construction Engineering and Management, 132(4), pp. 345-352. ISSN 0733-9364

Shohet, I M and Paciuk, M (2006) Service life prediction of exterior cladding components under failure conditions. Construction Management and Economics, 24(2), pp. 131-148. ISSN 01446193

Short, C A; Whittle, G E and Owarish, M (2006) Fire and smoke control in naturally ventilated buildings. Building Research & Information, 34(1), pp. 23-54. ISSN 0961-3218

Shrestha, R B and Ogunlan, S (2006) Comparative study of power purchase agreements in the Nepalese environment. Journal of Financial Management of Property and Construction, 11(3), pp. 133-148. ISSN 1366-4387

Singh, D and Tiong, R L K (2006) Contractor selection criteria: Investigation of opinions of Singapore construction practitioners. Journal of Construction Engineering and Management, 132(9), pp. 998-1008. ISSN 0733-9364

Sinha, S; Kumar, B and Thomson, A (2006) Measuring project complexity: A project manager's tool. Architectural Engineering and Design Management, 2(3), pp. 187-202. ISSN 1745-2007

Skitmore, M and Runeson, G (2006) Bidding models: Testing the stationarity assumption. Construction Management and Economics, 24(8), pp. 791-803. ISSN 1466433X

Skitmore, M; Runeson, G and Chang, X (2006) Construction price formation: Full-cost pricing or neoclassical microeconomic theory? Construction Management and Economics, 24(7), pp. 773-783. ISSN 1466433X

Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Empirical evaluation of structural frame performance criteria: Realizing the potential of hybrid concrete construction. Journal of Construction Engineering and Management, 132(3), pp. 278-290. ISSN 0733-9364

Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Towards an explicit design decision process: The case of the structural frame. Construction Management and Economics, 24(6), pp. 603-614. ISSN 1466433X

Song, J; Haas, C T and Caldas, C H (2006) Tracking the location of materials on construction job sites. Journal of Construction Engineering and Management, 132(9), pp. 911-918. ISSN 0733-9364

Song, Y and Chua, D K H (2006) Modeling of functional construction requirements for constructability analysis. Journal of Construction Engineering and Management, 132(12), pp. 1314-1326. ISSN 0733-9364

Song, Y; Liu, C and Langston, C (2006) Extending construction linkage measures by the consideration of the impact of capital. Construction Management and Economics, 24(11), pp. 1207-1216. ISSN 1466433X

Song, Y; Liu, C and Langston, C (2006) Linkage measures of the construction sector using the hypothetical extraction method. Construction Management and Economics, 24(6), pp. 579-589. ISSN 1466433X

Spielholz, P; Davis, G and Griffith, J (2006) Physical risk factors and controls for musculoskeletal disorders in construction trades. Journal of Construction Engineering and Management, 132(10), pp. 1059-1068. ISSN 0733-9364

Srour, I M; Haas, C T and Borcherding, J D (2006) What does the construction industry value in its workers? Journal of Construction Engineering and Management, 132(10), pp. 1053-1058. ISSN 0733-9364

Srour, I M; Haas, C T and Morton, D P (2006) Linear programming approach to optimize strategic investment in the construction workforce. Journal of Construction Engineering and Management, 132(11), pp. 1158-1166. ISSN 0733-9364

Steadman, P (2006) Allometry and built form: Revisiting Ranko Bon's work with the harvard philomorphs. Construction Management and Economics, 24(7), pp. 755-765. ISSN 1466433X

Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: A case study. Construction Management and Economics, 24(4), pp. 339-348. ISSN 01446193

Stoy, C and Kalusche, W (2006) The determination of occupancy costs during early project phases. Construction Management and Economics, 24(9), pp. 933-944. ISSN 1466433X

Stoy, C and Kytzia, S (2006) Benchmarking electricity consumption. Construction Management and Economics, 24(10), pp. 1083-1089. ISSN 1466433X

Styhre, A and Josephson, P E (2006) Revisiting site manager work: Stuck in the middle? Construction Management and Economics, 24(5), pp. 521-528. ISSN 1466433X

Su, Y Y; Hashash, Y M A and Liu, L Y (2006) Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management, 132(12), pp. 1234-1241. ISSN 0733-9364

Sun, M; Fleming, A; Senaratne, S; Motawa, I and Yeoh, M L (2006) A change management toolkit for construction projects. Architectural Engineering and Design Management, 2(4), pp. 261-271. ISSN 1745-2007

Sunikka, M (2006) Energy efficiency and low-carbon technologies in urban renewal. Building Research & Information, 34(6), pp. 521-533. ISSN 0961-3218

Suraji, A; Sulaiman, K; Mahyuddin, N and Mohamed, O (2006) Rethinking construction safety: An introduction to total safety management. Journal of Construction Research, 7(1), pp. 49-63. ISSN 1609-9451

Tam, C M; Tong, T K L and Chan, K K (2006) Rough set theory for distilling construction safety measures. Construction Management and Economics, 24(11), pp. 1199-1206. ISSN 1466433X

Tam, V W Y; Tam, C M; Shen, L Y; Zeng, S X and Ho, C M (2006) Environmental performance assessment: Perceptions of project managers on the relationship between operational and environmental performance indicators. Construction Management and Economics, 24(3), pp. 287-299. ISSN 01446193

Tam, V W Y; Tam, C M; Yiu, K T W and Cheung, S O (2006) Critical factors for environmental performance assessment (EPA) in the Hong Kong construction industry. Construction Management and Economics, 24(11), pp. 1113-1123. ISSN 1466433X

Tang, C M; Leung, A Y T and Lam, K C (2006) Entropy application to improve construction finance decisions. Journal of Construction Engineering and Management, 132(10), pp. 1099-1113. ISSN 0733-9364

Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: A Hong Kong case study. Construction Management and Economics, 24(4), pp. 349-365. ISSN 01446193

Tang, W; Duffield, C F and Young, D M (2006) Partnering mechanism in construction: An empirical study on the Chinese construction industry. Journal of Construction Engineering and Management, 132(3), pp. 217-229. ISSN 0733-9364

Tatum, C B; Vorster, M and Klingler, M (2006) Innovations in earthmoving equipment: New forms and their evolution. Journal of Construction Engineering and Management, 132(9), pp. 987-997. ISSN 0733-9364

Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364

Teerajetgul, W and Charoenngam, C (2006) Factors inducing knowledge creation: Empirical evidence from Thai construction projects. Engineering, Construction and Architectural Management, 13(6), pp. 584-599. ISSN 0969-9988

Telem, D; Laufer, A and Shapira, A (2006) Only dynamics can absorb dynamics. Journal of Construction Engineering and Management, 132(11), pp. 1167-1177. ISSN 0733-9364

Telem, D; Shapira, A; Goren, Y D and Schexnayder, C J (2006) Moving a reinforced-concrete building: Case study. Journal of Construction Engineering and Management, 132(2), pp. 115-124. ISSN 0733-9364

Teo, E A L and Harikrishna, N (2006) A quantitative model for efficient maintenance of plastered and painted façades. Construction Management and Economics, 24(12), pp. 1283-1293. ISSN 1466433X

Thomas, A V; Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(4), pp. 407-424. ISSN 01446193

Thomas, H R and Horman, M J (2006) Fundamental principles of workforce management. Journal of Construction Engineering and Management, 132(1), pp. 97-104. ISSN 0733-9364

Thomson, D S; Austin, S A; Root, D S; Thorpe, A and Hammond, J W (2006) A problem-solving approach to value-adding decision making in construction design. Engineering, Construction and Architectural Management, 13(1), pp. 43-61. ISSN 0969-9988

Tokdemir, O B; Arditi, D and Balcik, C (2006) ALISS: Advanced linear scheduling system. Construction Management and Economics, 24(12), pp. 1253-1267. ISSN 1466433X

Tombesi, P (2006) Good thinking and poor value: On the socialization of knowledge in construction. Building Research & Information, 34(3), pp. 272-286. ISSN 0961-3218

Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364

Tse, R Y C and Webb, J R (2006) An economic analysis of housing construction evidence from Hong Kong. Journal of Construction Research, 7(1), pp. 1-12. ISSN 1609-9451

Tserng, H P; Yin, S Y L and Li, S (2006) Developing a resource supply chain planning system for construction projects. Journal of Construction Engineering and Management, 132(4), pp. 393-407. ISSN 0733-9364

Tucker, R and Rollo, J (2006) Teaching and learning in collaborative group design projects. Architectural Engineering and Design Management, 2(1-2), pp. 19-30. ISSN 1745-2007

Turner, R K (2006) Sustainability auditing and assessment challenges. Building Research & Information, 34(3), pp. 197-200. ISSN 0961-3218

Uwakweh, B O (2006) Motivational climate of construction apprentice. Journal of Construction Engineering and Management, 132(5), pp. 525-532. ISSN 0733-9364

Van Dijken, F; Van Bronswijk, J E M H and Sundell, J (2006) Indoor environment and pupils' health in primary schools. Building Research & Information, 34(5), pp. 437-446. ISSN 0961-3218

Vanhoucke, M (2006) Work continuity constraints in project scheduling. Journal of Construction Engineering and Management, 132(1), pp. 14-25. ISSN 0733-9364

Waara, F and Bröchner, J (2006) Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management, 132(8), pp. 797-804. ISSN 0733-9364

Walsh, K D; Sawhney, A and Vachris, M A (2006) Improving inter-spatial comparison of construction costs. Engineering, Construction and Architectural Management, 13(2), pp. 123-135. ISSN 0969-9988

Wang, D; Hadavi, A and Krizek, R J (2006) Chinese construction firms in reform. Construction Management and Economics, 24(5), pp. 509-519. ISSN 1466433X

Wells, J (2006) Labour subcontracting in the construction industries of developing countries: An assessment from two perspectives. Journal of Construction in Developing Countries, 11(1), pp. 17-36. ISSN 1823-6499

Werna, E (2006) The construction action programme of the international labour office: A view of on-going implementation and implications for research. Journal of Construction in Developing Countries, 11(1), pp. 53-72. ISSN 1823-6499

West, T and Worthington, A C (2006) Macroeconomic risk factors in Australian commercial real estate, listed property trust and property sector stock returns. Journal of Financial Management of Property and Construction, 11(2), pp. 105-116. ISSN 1366-4387

White, N J (2006) Destruction of the contract through material changes. International Journal of Construction Education and Research, 2(1), pp. 43-51. ISSN 1557-8771

Whitla, P; Walters, P and Davies, H (2006) The use of global strategies by British construction firms. Construction Management and Economics, 24(9), pp. 945-954. ISSN 1466433X

Wibowo, A (2006) CAPM-based valuation of financial government supports to infeasible and risky private infrastructure projects. Journal of Construction Engineering and Management, 132(3), pp. 239-248. ISSN 0733-9364

Wiguna, I P A and Scott, S (2006) Relating risk to project performance in Indonesian building contracts. Construction Management and Economics, 24(11), pp. 1125-1135. ISSN 1466433X

Winch, G M (2006) Towards a theory of construction as production by projects. Building Research & Information, 34(2), pp. 164-174. ISSN 0961-3218

Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364

Wong, C H and Sloan, B (2006) An empirical survey of the UK construction SME e-procurement readiness from the e-legal aspects. Journal of Construction Research, 7(1), pp. 81-97. ISSN 1609-9451

Wong, J M W; Chan, A P C and Chiangn, Y H (2006) The changing construction labour market: A case of Hong Kong. Journal of Engineering, Design and Technology, 4(1), pp. 1-17. ISSN 1726-0531

Wong, J T Y and Hui, E C M (2006) Construction project risks: Further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(4), pp. 425-438. ISSN 01446193

Wood, A (2006) Demystifying construction: Technology in architectural education. Architectural Engineering and Design Management, 2(1-2), pp. 5-18. ISSN 1745-2007

Wu, S; Clements-Croome, D; Fairey, V; Albany, B; Sidhu, J; Desmond, D and Neale, K (2006) Reliability in the whole life cycle of building systems. Engineering, Construction and Architectural Management, 13(2), pp. 136-153. ISSN 0969-9988

Yang, C P (2006) Factors affecting the performance of public projects in Taiwan. Journal of Construction Research, 7(1), pp. 207-225. ISSN 1609-9451

Yang, I T (2006) Using Gaussian copula to simulate repetitive projects. Construction Management and Economics, 24(9), pp. 901-909. ISSN 1466433X

Yang, M L; Chen, S J and Chen, S T (2006) Innovative central opening strut system for foundation excavation. Journal of Construction Engineering and Management, 132(1), pp. 58-66. ISSN 0733-9364

Yean, F and Ling, Y (2006) Design-build: How to increase its usage and its impact on architects and contractors in Singapore. Construction Economics and Building, 6(1), pp. 12-24. ISSN 2204-9029

Yi, K J and Langford, D (2006) Scheduling-based risk estimation and safety planning for construction projects. Journal of Construction Engineering and Management, 132(6), pp. 626-635. ISSN 0733-9364

Yiu, T W; Cheung, S O and Mok, F M (2006) Logistic likelihood analysis of mediation outcomes. Journal of Construction Engineering and Management, 132(10), pp. 1026-1036. ISSN 0733-9364

Yu, A T W; Shen, Q; Kelly, J and Hunter, K (2006) Investigation of critical success factors in construction project briefing by way of content analysis. Journal of Construction Engineering and Management, 132(11), pp. 1178-1186. ISSN 0733-9364

Yu, A T W; Shen, Q; Kelly, J and Lin, G (2006) A value management approach to strategic briefing: An exploratory study. Architectural Engineering and Design Management, 2(4), pp. 245-259. ISSN 1745-2007

Yu, J H; Lee, H S and Kim, W (2006) Evaluation model for information systems benefits in construction management processes. Journal of Construction Engineering and Management, 132(10), pp. 1114-1121. ISSN 0733-9364

Yu, W D (2006) PIREM: A new model for conceptual cost estimation. Construction Management and Economics, 24(3), pp. 259-270. ISSN 01446193

Zhang, G and Yang, J (2006) Factors influencing the implementation of the raised floor system in Australian office buildings. Construction Management and Economics, 24(5), pp. 529-543. ISSN 1466433X

Zhang, H; Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(2), pp. 159-169. ISSN 01446193

Zhang, H; Li, H and Tam, C M (2006) Particle swarm optimization for preemptive scheduling under break and resource-constraints. Journal of Construction Engineering and Management, 132(3), pp. 259-267. ISSN 0733-9364

Zhang, H; Tam, C M; Li, H and Shi, J J (2006) Particle swarm optimization-supported simulation for construction operations. Journal of Construction Engineering and Management, 132(12), pp. 1267-1274. ISSN 0733-9364

Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364

Zhang, S B and Liu, A M M (2006) Organisational culture profiles of construction enterprises in China. Construction Management and Economics, 24(8), pp. 817-828. ISSN 1466433X

Zhang, X (2006) Factor analysis of public clients' best-value objective in public-privately partnered infrastructure projects. Journal of Construction Engineering and Management, 132(9), pp. 956-965. ISSN 0733-9364

Zhang, X (2006) Markov-based optimization model for building facilities management. Journal of Construction Engineering and Management, 132(11), pp. 1203-1211. ISSN 0733-9364

Zhang, X (2006) Public clients' best value perspectives of public private partnerships in infrastructure development. Journal of Construction Engineering and Management, 132(2), pp. 107-114. ISSN 0733-9364

Zhang, X; Goulding, J S; Sexton, M G; Aouad, G and Kagioglou, M (2006) HyCon: Virtual prototyping in hybrid concrete construction frame design. Construction Innovation, 6(1), pp. 47-60. ISSN 1471-4175

Zhao, T and Fu, C C (2006) Infrastructure development and expansion under uncertainty: A risk-preference-based lattice approach. Journal of Construction Engineering and Management, 132(6), pp. 620-625. ISSN 0733-9364

Zou, J and Zillante, G (2006) Relationship contracting: The South Australian experience: a case study. Construction Economics and Building, 6(2), pp. 20-31. ISSN 2204-9029

Zou, P X W (2006) Strategies for minimizing corruption in the construction industry in China. Journal of Construction in Developing Countries, 11(2), pp. 15-29. ISSN 1823-6499

Zou, P X W and Darvish, H (2006) Group assignments and teamwork skills development in postgraduate construction management studies. Architectural Engineering and Design Management, 2(3), pp. 203-215. ISSN 1745-2007

Thesis

Adetunji, I O (2006) Sustainable construction: a web-based performance assessment tool. EngD thesis, Loughborough University, UK.

Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. PhD thesis, State University of New York at Buffalo, USA.

Al-Husseini, A-M (2006) The impact of transformational leadership and empowerment on project management. DM thesis, University of Phoenix, USA.

Al-Ibrahim, A (2006) Optimizing roof maintenance and replacement decisions. PhD thesis, North Carolina State University, USA.

Al-Kaabi, N S (2006) A fuzzy-based construction safety advisor (CSA) for construction safety in the United Arab Emirates. PhD thesis, Ohio State University, USA.

Alhudaithy, I M (2006) Rights of tenderers and contractors under Saudi public procurement contract regulations: a comparative study with England and Wales. PhD thesis, Durham University, UK.

Ali, K S (2006) Construction project planning: Improving effectiveness of resources allocation. PhD thesis, University College London, UK.

Ali, Tauha H (2006) Influence of national culture on construction safety climate in Pakistan. PhD thesis, Griffith University, Pakistan.

Aljammaz, K M A (2006) An approach for the assessment of sustainability of construction materials. PhD thesis, University of Newcastle upon Tyne, UK.

Alnsour, J A M (2006) Planning and managing the built environment in the context of compliance with residential standards in Jordan. PhD thesis, University of Huddersfield, UK.

Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships. PhD thesis, George Washington University, USA.

Anderson, P M (2006) Construction collaboration: a QFD approach. PhD thesis, Loughborough University, UK.

Anumba, C (2006) Application of GIS to labour market planning in construction. EngD thesis, Loughborough University, UK.

Arain, F M (2006) Knowledge-based decision support system (kbdss) for management of variation orders for school building projects in Singapore. PhD thesis, National University of Singapore, Singapore.

Avitts, E (2006) Live the dream: The rhetoric of the furnished model home at the turn of the twenty-first century. PhD thesis, University of Delaware, USA.

Baiden, B K (2006) Framework for the integration of the project delivery team. PhD thesis, Loughborough University, UK.

Banks, N A (2006) “The last bastion of discrimination”: The New York city building trades and the struggle over affirmative action, 1961–1976. PhD thesis, Columbia University, USA.

Barker, R (2006) Waste assessment and application of improvement techniques in UK private housebuilding supply chains. PhD thesis, Cardiff University, UK.

Bartlett, H V (2006) Understanding the implementation of sustainability principles in UK educational building projects. PhD thesis, University of Cambridge, UK.

Bastias, A (2006) Towards the application of learning systems for decision support in construction engineering and management. PhD thesis, University of Colorado at Boulder, USA.

Bayraktar, M E (2006) A decision model to determine the optimal time-cost trade off in highway work zone projects. PhD thesis, Purdue University, USA.

Becerik, B (2006) Implementation and value of online collaboration and project management systems in design and construction. DDes thesis, Harvard University, USA.

Besser, D (2006) The experience of women in construction management: A hermeneutic phenomenological study. PhD thesis, University of Minnesota, USA.

Boukamp, F (2006) Modeling of and reasoning about construction specifications to support automated defect detection. PhD thesis, Carnegie Mellon University, USA.

Brito, Luiz Antonio Perrone Ferreira de (2006) Corrections in the determination of the sound power level obtained through intensimetry technique. PhD thesis, Universidade Estadual de Campinas, Brazil.

Carvajal-Figueroa, A (2006) The identification and measurement of the benefits of visualization technologies during the briefing process. PhD thesis, University of Reading, UK.

Chandra, Shailja (2006) Investigating green building assessment tools: a risk-analysis based approach. PhD thesis, University of New South Wales, Australia.

Chen, H (2006) Exploring the relationships between influencing factors and performance for construction joint ventures. PhD thesis, University of Hong Kong, Hong Kong.

Chen, K G (2006) Culture on trust within organizations between China and the UK. PhD thesis, University College London, UK.

Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance. PhD thesis, Columbia University, USA.

Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.

Choong, Yi (2006) A mapping approach to investigating information and communication technology implementation during the building design process. PhD thesis, RMIT University, Australia.

Cochran, K M (2006) Construction and demolition debris recycling: Methods, markets, and policy. PhD thesis, University of Florida, USA.

Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.

Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants. EngD thesis, Brunel University, UK.

Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.

Cunningham, K R (2006) An investigation of vocational choice among community college construction education students in the state of Pennsylvania. PhD thesis, Pennsylvania State University, USA.

Dai, J (2006) A latent analysis and prototype system to manage jobsite factors impacting construction labor productivity. PhD thesis, University of Kentucky, USA.

Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.

Danso-Amoako, M O (2006) Developing a framework to support data exchange from heterogeneous data sources via industry foundation classes (IFC) and web services. PhD thesis, University of Florida, USA.

Das, P K (2006) A sustainability impact-assessment tool for selected building technologies in rural India: the case of the Andhra Pradesh primary education project. PhD thesis, University of Newcastle upon Tyne, UK.

De Zoysa, G N S (2006) Application and re-use of information and knowledge in managing risks of infrastructure projects. PhD thesis, University of British Columbia, Canada.

Dettwiler, P (2006) Facilities management of the offices of growth firms: Phases and locations. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Dib, H Y (2006) Visual information access and management for life cycle project management. PhD thesis, University of Florida, USA.

Dissanayake, G M (2006) An integrated computational intelligence framework for construction performance diagnosis. PhD thesis, University of Alberta, Canada.

Dobossy, M E (2006) Simulation-based seismic reliability assessment of complex structural systems. PhD thesis, Princeton University, USA.

Dobraszczyk, P A (2006) Into the belly of the beast: Exploring London's main drainage system, c.1848-1868. PhD thesis, University of Reading, UK.

Dorward, D R (2006) The effect of selected output modifications on facilitating the assessment of PDM schedules. PhD thesis, Indiana State University, USA.

Dunne, K O (2006) Effective leadership in the multi-faceted client organisation: A case study on the Olympic client coalition. PhD thesis, University College London, UK.

Ekanayake, L L (2006) Interface conflicts and regulatory decision making process on power projects in Sri Lanka. PhD thesis, National University of Singapore, Singapore.

Eleyan, D (2006) Project review solution-directed model using system dynamics modelling. PhD thesis, University of Manchester, UK.

Elhakeem, A A M (2006) An asset management framework for educational buildings with life-cycle cost analysis. PhD thesis, University of Waterloo, Canada.

Fenech, N (2006) Managing risks within international hotel construction projects. PhD thesis, University College London, UK.

Fu, C (2006) Integration and interoperability of IT applications and information in construction - a study in nD modelling. PhD thesis, University of Salford, UK.

Gebken, Richard John (2006) Quantification of transactional dispute resolution costs for the U.S. Construction industry. PhD thesis, University of Texas at Austin, USA.

Gebken II, R J (2006) Quantification of transactional dispute resolution costs for the United States construction industry. PhD thesis, University of Texas at Austin, USA.

Ghanbari, A (2006) Model-based integrated total project management systems, with an emphasis on materials management. PhD thesis, University of British Columbia, Canada.

Gkritza, K (2006) Economic development effects of highway investment. PhD thesis, Purdue University, USA.

Gordon, C (2006) A formalism and a framework for planning of sensor-based construction inspections. PhD thesis, Carnegie Mellon University, USA.

Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli. PhD thesis, University of Newcastle upon Tyne, UK.

Griffith, A (2006) Expanding knowledge and practice of construction management systems and procedures. DSc thesis, Sheffield Hallam University, UK.

Guo, K (2006) Risk of pavement warranties to contractors. PhD thesis, University of Florida, USA.

Hajjah Dayang Suzana, B H A A (2006) An exploration of the business environment of the construction industry of Negara Brunei Darussalam: in the context of public-private partnerships, privatisation and private finance initiatives. PhD thesis, University of Strathclyde, UK.

Hare, W J (2006) Integration of health and safety planning in construction project management through the development of a best practice gateway model. PhD thesis, Glasgow Caledonian University, UK.

Hasan, N (2006) Developing a balanced scorecard model for evaluation of project management and performance. PhD thesis, University of Birmingham, UK.

He, Y (2006) Earthquake loss and risk estimation of buildings by Monte Carlo simulation. PhD thesis, Columbia University, USA.

Hefferan, Michael (2006) An examination of the interface between commercial property assets and contemporary knowledge-intensive firms: Demands, responses and priorities. PhD thesis, Queensland University of Technology, Australia.

Hesse, K A (2006) Development of information communication technologies in construction project management: The relationship between theory and technology and its application to the construction industry, including a retrospective on the development of technology that demonstrates how theory was altered and how practice was influenced. PhD thesis, University College London, UK.

Hong, J (2006) A study on analytic approaches to intelligent buildings assessment. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Hou, J-H (2006) Object modeling and proper abstractions: The case of stair design. DDes thesis, Harvard University, USA.

Hwang, B G (2006) Development of a performance measurement system for the delivery of pharmaceutical capital facility projects. PhD thesis, University of Texas at Austin, USA.

Isikdag, U (2006) Towards the implementation of building information models in geospatial context. PhD thesis, University of Salford, UK.

Jackson, F (2006) Biodegradable hydraulic fluids: Reducing oil-related pollution in the construction industry. PhD thesis, Nottingham Trent University, UK.

Jeong, J G (2006) A framework for supply chain modeling and optimization for the manufactured housing industry. PhD thesis, Purdue University, USA.

Jiang, H (2006) Chinese multinational construction firms in international and domestic markets: A re-examination of the eclectic paradigm. PhD thesis, National University of Singapore, Singapore.

Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.

Kabo, F W (2006) Low-cost housing design and provision: A case study of Kenya. PhD thesis, University of Michigan, USA.

Kang, S-C (2006) Computer planning and simulation of construction erection processes using single or multiple cranes. PhD thesis, Stanford University, USA.

Kappia, J G (2006) Career dynamics within the construction industry: a trade and craft perspective. PhD thesis, Loughborough University, UK.

Kassim, S M (2006) Sustainability of private sector in solid waste collection: a case of Dar es Salaam Tanzania. PhD thesis, Loughborough University, UK.

Khadaroo, M I (2006) Exploring perceptions of accountability and value for money in school PPP/PFI contracts. PhD thesis, Queen's University Belfast, UK.

Khalafallah, A M (2006) Optimal construction site layout planning for airport expansion projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kiamos, K (2006) Comparing the major project management bodies of knowledge with Greek practice in the construction industry. PhD thesis, University College London, UK.

Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.

Knebel, V (2006) Preserve and rebuild: the built environment, status transformations and identity construction in eastern Germany after reunification. PhD thesis, University of Edinburgh, UK.

Koch, D C (2006) Factors that influence students' choice of careers in construction management. PhD thesis, Purdue University, USA.

Krook, J (2006) Concentrate or dilute contaminants? Strategies for Swedish wood waste. PhD thesis, Linköping University, Sweden.

Kua, H W (2006) The design of effective policies for the promotion of sustainable construction materials. PhD thesis, Massachusetts Institute of Technology, USA.

Kübler, O (2006) Applied decision-making in civil engineering. DSc thesis, ETH Zürich, Switzerland.

Langevine, R (2006) A decision support system for the maintenance management of buildings. PhD thesis, University of Alberta, Canada.

Le Gallais, Tricia Anne (2006) Building identities in FE: A case study of construction lecturers. PhD thesis, Birmingham City University, UK.

Lee, S (2006) Dynamic planning and control methodology: Understanding and managing iterative error and change cycles in large-scale concurrent design and construction projects. PhD thesis, Massachusetts Institute of Technology, USA.

Lehtonen, T J T (2006) Partnering relations: Justification and success factors from facilities management services perspective. DScTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Li, S (2006) Three essays on bidding in the construction industry. PhD thesis, University of Utah, USA.

Liang, Y (2006) Integrated IT systems for construction site management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lim, K H (2006) Causal model for management of subcontractors in waste minimization. PhD thesis, National University of Singapore, Singapore.

Lippard, C D (2006) Building inequality: A case study of white, black, and latino contractors in the Atlanta construction industry. PhD thesis, Georgia State University, USA.

Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida. PhD thesis, University of Florida, USA.

Lu, W (2006) A system for assessing and communicating contractors' competitiveness. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Magdub, R H (2006) Application of the lump sum turnkey contracts in Libyan civil law with reference to English law and international practice. PhD thesis, Glasgow Caledonian University, UK.

Magub, A T (2006) Experiences of the phenomenon of internet use for information sharing on construction projects and skills set identification for effective project participation. PhD thesis, Queensland University of Technology, Australia.

Mahalingam, A (2006) Understanding and mitigating institutional costs on global projects. PhD thesis, Stanford University, USA.

Maqsood, Tayyab (2006) Role of knowledge management in supporting innovation and learning in construction. PhD thesis, RMIT University, Australia.

Marshall-Ponting, A J (2006) nD modelling as an enabler of inter-disciplinary thinking among construction industry stakeholders. PhD thesis, University of Salford, UK.

Mat Zin, R (2006) A case study of management control. A construction project: Issues of transaction costs and trust. PhD thesis, University of Manchester, UK.

Menches, C L (2006) Effect of pre-construction planning on electrical project performance. PhD thesis, University of Wisconsin - Madison, USA.

Milberg, C T (2006) Application of tolerance management to civil systems. PhD thesis, University of California, Berkeley, USA.

Mohamed, S F (2006) Improving construction site management practices through knowledge management. PhD thesis, Loughborough University, UK.

Moore, J D (2006) Women in construction management: Creating a theory of career choice and development. PhD thesis, Colorado State University, USA.

Mourshed, M (2006) Interoperability-based optimisation of architectural design. PhD thesis, Loughborough University, UK.

Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Olander, S (2006) External stakeholder analysis in construction project management. PhD thesis, Lund University, Sweden.

Omoregie, A (2006) Blueprints for infrastructure and service delivery in Sub-Saharan Africa. PhD thesis, De Montfort University, UK.

Osman, A E (2006) Life cycle optimization model for integrated cogeneration and energy systems applications in buildings. PhD thesis, University of Pittsburgh, USA.

Pan, J (2006) Construction project information management in a semantic web environment. PhD thesis, Loughborough University, UK.

Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. PhD thesis, Loughborough University, UK.

Pavlovas, V (2006) Energy savings in existing Swedish apartment buildings: Some aspects on demand controlled ventilation and individual metering. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Peng, M (2006) Item-level quantity-based preliminary cost estimating system for highway structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Peng, Min (2006) Item-level quantity-based preliminary cost estimating system for highways structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Persson, M H (2006) Lessons learned in knowledge management: The case of construction. PhD thesis, Lund University, Sweden.

Pickhaver, J A (2006) Numerical modelling of building response to tunnelling. PhD thesis, University of Oxford, UK.

Pryce, M (2006) An exploration of the benefits, drivers and barriers that affect the adoption of green roofs in urban Britain. PhD thesis, University of Salford, UK.

Qu, T (2006) The usability of graphical user interfaces of mobile computing devices designed for construction foremen: Icons and pre-defined text lists compared. PhD thesis, University of Florida, USA.

Rihani, R A (2006) An investigation of critical success factors for robotic masonry. PhD thesis, North Carolina State University, USA.

Roza, C (2006) Environmental assessment: The Eden project. PhD thesis, University College London, UK.

Ruikar, K (2006) Business process implications of e-commerce in construction organisations. EngD thesis, Loughborough University, UK.

Salonen, A (2006) Relational risk and relationship management in facilities management partnerships. PhD thesis, Helsinki University of Technology, Finland.

Samuelsson, P (2006) Integrated measurement and assessment of performance in large organizations: The case of a Swedish construction company. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Satti, H M (2006) Integrating building code analysis within the architectural design process into the building information model. PhD thesis, Illinois Institute of Technology, USA.

Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.

Seraphim, D l (2006) Implementing TQM principles in a construction company in the UAE. PhD thesis, University of South Wales, UK.

Shakoorian, A (2006) Performance assessment of building commissioning process as a quality assurance system. PhD thesis, Georgia Institute of Technology, USA.

Shane, J S (2006) A fundamental study of scope definition in early highway project development. PhD thesis, University of Colorado at Boulder, USA.

Shell, J F (2006) Decision-making strategies used by California school districts' chief business officials in the selection of construction management services as a project delivery system for construction projects over five million dollars. EdD thesis, University of La Verne, USA.

Shepherd, S (2006) Evaluation of an engineering intervention to prevent silica exposures in construction. ScD thesis, University of Massachusetts Lowell, USA.

Sinha, S (2006) Skill based framework for measuring complexity of construction projects. PhD thesis, University of Strathclyde, UK.

Sleymann, A A (2006) A study on perceptions of civil engineers regarding mandatory continuing education. PhD thesis, Western Michigan University, USA.

Sobeih, T M (2006) Work compatibility and musculoskeletal disorders among construction workers. PhD thesis, University of Cincinnati, USA.

Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. PhD thesis, University of Manchester, UK.

Srithongrung, A (2006) The impact of state capital budget and management programs on state capital budget decisions and economic performance. DPA thesis, University of Illinois at Springfield, USA.

Stenberg, A-C I (2006) The social construction of green building: Diachronic and synchronic perspectives. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Suresh, S (2006) Knowledge capture in small and medium enterprises in the UK construction industry. PhD thesis, Glasgow Caledonian University, UK.

Tan, H C (2006) A methodology for the 'live' capture and reuse of project knowledge in construction. PhD thesis, Loughborough University, UK.

Tan, Y (2006) A case-based reasoning approach to improve risk identification in construction projects. PhD thesis, University of Leeds, UK.

Tang, Y (2006) Evolutionary and customer-oriented building design process. PhD thesis, Loughborough University, UK.

Taylor, J E (2006) Three perspectives on innovation in interorganizational networks: Systemic innovation, boundary object change, and the alignment of innovations and networks. PhD thesis, Stanford University, USA.

Teizer, J (2006) Real-time spatial modeling to detect and track resources on construction sites. PhD thesis, University of Texas at Austin, USA.

Teo, R A (2006) Continuous improvement to the construction industry: Enhancing quality through learning. PhD thesis, Heriot-Watt University, UK.

Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Thomson, C S (2006) A study of the innovation process within the construction project environment. PhD thesis, University of Dundee, UK.

Tseng, C-H (2006) Safety performance analyzer for constructed environments (SPACE). PhD thesis, Ohio State University, USA.

Unger, C (2006) Industrialised house building: Fundamental change or business as usual? PhD thesis, KTH Royal Institute of Technology, Sweden.

Vaziri, K (2006) Program planning under uncertainty. PhD thesis, Cornell University, USA.

Voronov, M (2006) Investigating the relationship between power and strategic organizational learning. PhD thesis, Columbia University, USA.

Wang, P (2006) Production-based large scale construction simulation modeling. PhD thesis, University of Alberta, Canada.

Weiss, A P W (2006) Value for money: defining and measuring 'value' in MoD's acquisition policy of obtaining best value for money. PhD thesis, University College London, UK.

Widén, K (2006) Innovation diffusion in the construction sector. PhD thesis, Lund University, Sweden.

Wong, Kwok Tung Thomas (2006) Strategies for environmental sustainability in Hong Kong's construction industry. PhD thesis, University of South Australia, Australia.

Wong, M K (2006) A study of capacity predictions for driven piles by dynamic pile testing. PhD thesis, University of Hong Kong, Hong Kong.

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yan, C (2006) Risk management strategy of construction projects in China. PhD thesis, University of Bedfordshire, UK.

Yuan, L (2006) Biomechanical analysis of the physical loads on the low back and shoulder during drywall installation. ScD thesis, University of Massachusetts Lowell, USA.

Zhang, X (2006) Toward innovative and efficient infrastructure delivery. PhD thesis, University of Alberta, Canada.

Conference Paper

Abdel-Wahab, M S; Dainty, A R J and Ison, S G (2006) How productive is the construction industry? In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Adebayo, A K; Price, A D F and Gibb, A G F (2006) Impact of modern methods of construction on healthcare infrastructure. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Adeyeye, K; Pasquire, C; Bouchlaghem, D and Chandler, J (2006) Exploring the efficacy of digital tools for the design and construction of hybrid buildings. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Afetornu, C; Edum-Fotwe, F T and McCaffer, R (2006) Estimating budget variability for road projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ahadzie, D K; Proverbs, D G and Olomolaiye, P (2006) Development of research instrument for project managers' performance measures in mass house building projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Aiyetan, A O and Olotuah, A O (2006) Impact of motivation on workers' productivity in the Nigerian construction industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Akbiyikli, R and Eaton, D (2006) Operation and maintenance (O&M) management in PFI road projects in the UK. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Al-Yami, A M and Price, A D F (2006) A framework for implementing sustainable construction in building briefing project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Alsdorf, M; Koch, C and Sander, D (2006) Coaching at the building site: A feasibility study. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Antoniadis, D N; Edum-Fotwe, F T and Thorpe, A (2006) Project reporting and complexity. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Auchterlounie, T (2006) An example of partnering between a North American speculative housebuilder and their subcontractors. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Bagies, A and Fortune, C (2006) Bid/no-bid decision modelling for construction projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Beaney, W D (2006) An examination of sectoral mobility in the UK labour force. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Braimah, N; Ndekugri, I and Gameson, R (2006) A review of industry standards and publications/charts for adjusting productivity losses in construction contracts. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Campbell, J M and Smith, S D (2006) CBR research using the 'think', 'plan', 'do' classification method. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Campbell, J M and Smith, S D (2006) Improving industrial value and longevity of safety management research. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chan, P W and Connolly, M (2006) The role of schools careers advisers in encouraging new entrants into construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chan, P W; Grantham, A; Kaplinsky, R; Mynors, D; Mohamed, S; Walsh, K and Coles, R (2006) A taxonomy of knowledge leakage: Some early developments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chang, C K and Sullivan, K T (2006) Workload ratio as an indicator of schedule acceleration and its relationship with labour efficiency. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chiang, Y H and Lok, L K L (2006) Sustainable advantages and corporate strategies: The case of prefabrication in Hong Kong. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chileshe, N (2006) Investigating practitioner's understanding of TQM in small and medium construction companies. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Collier, C (2006) Researchers' perceptions of the development of qualitative approaches in construction management research. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Davies, R (2006) Talking about construction innovation. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Davison, N; Goodier, C; Gibb, A; Austin, S; Saker, J and Gregory, C (2006) Factors influencing the market for branded mass customised buildings. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Dawood, N; Sikka, S; Marasini, R and Dean, J (2006) Development of key performance indicators to establish the benefits of 4D planning. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Dikmen, I; Birgonul, M T and Arikan, A E (2006) Application of an integrated risk management system (IRMS) to an international construction project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Dina Koutsikouri, D A A S (2006) Critical success factors for multidisciplinary engineering projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2006) Multiskilling: A UK construction and building services perspective. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Essa, R and Fortune, C (2006) Project price forecasting processes and pre-construction evaluation of sustainable housing association projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Faisol, N; Dainty, A R J and Price, A D F (2006) Perceptions of construction organisations on developing successful inter-organisational relationships. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Galea, N and Loosemore, M (2006) Men and conflict in the construction industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gomez, C P (2006) Reconceptualizing the management of technology in construction: A Malaysian perspective. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gorse, C; McKinney, I; Shepherd, A; Morley, D and Ellis, R (2006) Internal support mechanisms in groups and teams. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gorse, C; McKinney, I; Shepherd, A and Whitehead, P (2006) Meetings: Factors that affect group interaction and performance. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gottlieb, S C and Storgaard, K (2006) Flexible strategic partnerships in Danish construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Graham, B and Thomas, K (2006) Knowledge management in Irish construction: The role of CPD accreditation. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Graham, D; Smith, S D and Crapper, M (2006) Refining the case-based reasoning model of construction processes. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Harty, C; Goodier, C; Soetanto, R; Austin, S; Dainty, A; Price, A and Thorpe, T (2006) Scenario development: A methodology for aligning contemporary practices with the potential futures of UK construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Hatmoko, J U D and Scott, S (2006) Simulating the impact of supply chain management practice on construction project performance. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Hurst, A G (2006) The relationship between he recruitment levels and employment levels in the construction industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ikpe, E K P P D O D (2006) The management of construction health and safety: Investigating the cost-benefit. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Isiadinso, C; Anumba, C J; El-Rimawi, J and Bhamra, T (2006) Design for deconstruction lessons from the manufacturing industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Jewell, C (2006) Informal employment: A threat or an opportunity for the UK construction sector? In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kaatz, E; Root, D S; Hilland, R C and Bowen, P A (2006) Fostering sustainability and enhancing quality in construction with building sustainability assessment. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kappia, J G; Dainty, A R J and Price, A D F (2006) Using qualitative methods to explore career development for construction operatives. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kazaz, A and Ulubeyli, S (2006) Organizational factors influencing construction manpower productivity in Turkey. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kazaz, A and Ulubeyli, S (2006) Physical factors affecting productivity of Turkish construction workers. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kempton, J (2006) The potential for lean thinking in the refurbishment and repair of dwellings in the registered social landlord sector. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kheni, N A; Gibb, A G F and Dainty, A R J (2006) The management of construction site health and safety by small and medium-sized construction businesses in developing countries: A Ghana case study. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kishk, M (2006) Handling the conservative nature of fuzzy whole-life cost simulations. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kishk, M; Laing, R and Edge, M (2006) An extended whole-life application for the selection of hospital finishes. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, C and Larsen, C S (2006) Quality in construction: A supply chain perspective. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, C and Simonsen, R (2006) Operations strategy and innovation? A contractor implementing lean. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, C and Vogelius, P (2006) Evaluation of web and pda-based quality assurance system on a building site. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kridan, A B and Goulding, J S (2006) Assessing the role of knowledge management processes in implementing a knowledge management system: An application of the capability maturity model to the Libyan banking sector. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Laryea, S A and Hughes, W P (2006) The price of risk in construction projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Masurier, J L; Rotimi, J O B and Wilkinson, S (2006) A comparison between routine construction and post-disaster reconstruction with case studies from New Zealand. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Mo, Y; Dainty, A and Price, A (2006) The relevance of eq to construction project management education and practice: An investigative framework. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Mogotlhwane, T; Khosrowshahi, F and Underwood, J (2006) Impact of ICT applications in performance: Search for evidence. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ng, A and Loosemore, M (2006) Risk allocation in public private partnership (PPP) projects: The new southern railway project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Nielsen, Y; Kumas, N and Ciftci, C (2006) ICT use in Turkish construction sector: Existing laws and regulations. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Nugraheni, F and Scott, D (2006) An approach to define construction practice from construction images. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Nystrom, J (2006) The naivety of partnering assessments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ochieng, E and Price, A D F (2006) Reforming the management of industrial projects in developing countries: The role of strategic planning. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Okoroh, M I; Goulding, J S and Walker, S (2006) Outsourcing local authorities housing stocks. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Olotuah, A O and Aiyetan, A O (2006) Sustainable low-cost housing provision in Nigeria: A bottom-up participatory approach. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Omoregie, A and Radford, D (2006) Polycentric cultural framework for infrastructure procurement in Nigeria. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Onyenobi, T; Hudson, J and Ormerod, M (2006) Impact of building geometry on fire spread rate. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Patsiadas, P (2006) Public private partnership in motorway service areas: Decision making, investment analysis and best practice tools. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Penn, A (2006) What can architectural research bring to organization theory? In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Phua, F (2006) Examining the effects of senior executives' perceived environmental uncertainty on the strategic functions of construction firms. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Riaz, Z; Edwards, D J; Mackenzie, J and Thorpe, T (2006) Emerging information, communication and technology systems applied to construction vehicle safety. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Salama, M; Al-Sharif, F; Kaka, A P and Leishman, C (2006) Cost modelling for standardised design projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Salama, M; Aziz, H A E; Sawah, H E and Samadony, A E (2006) Investigating the criteria for contractors' selection and bid evaluation in Egypt. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sarden, Y and Stehn, L (2006) Industrialisation as a tool for reducing uncertainty in construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Selih, J (2006) Selection of refurbishment actions for residential buildings by multi criteria decision method. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sertyesihsik, B (2006) The effectiveness of the five-year development plans on the development of the construction sector. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Shafik, M and Martin, P (2006) The impact of procurement methods on the Scottish housebuilding industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Shafik, M and Martin, P (2006) The many faces of property market cycles. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Smallwood, J (2006) Scaffolding health and safety: A multi-stakeholder issue. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sullivan, K T; Kashiwagi, D; Savicky, J; Kashiwagi, M; Egbu, C and Chang, C K (2006) Increasing performance by minimizing the passing of information. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sullivan, K T; Kashiwagi, M; Badger, W W; Kashiwagi, D; Egbu, C and Chang, C K (2006) Leadership, the information environment, and the performance measuring project manager. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sward, A (2006) Relations as a key resource. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Tennant, S and Langford, D (2006) Team performance measurement: Let's reward teamwork. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Teo, M and Loosemore, M (2006) Community protest groups' perceptions of environmental risks using social contagion theory. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Thomas, J; Giddings, B and Little, L (2006) An holistic evaluation of the workplace environment. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Train, A; Egbu, C O and Hinks, J (2006) Key issues in innovation and knowledge management in the finance and construction sectors. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Tsai, H; Wang, L C and Lee, J W (2006) Exploration of ranking method of group decision making. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Volker, L and Prins, M (2006) Critical reflections on measuring the effect of steering activities in architectural design. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Wall, J and Ahmed, V (2006) Delivering continuing professional development for construction management using e-learning. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Wamuziri, S and Klatt, A (2006) Expanding water supply and sanitation in Sub-Saharan Africa using microfinance. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Wilson, B; An, M and Evdorides, H (2006) The effects of building and planning regulations on construction and demolition waste management. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Wu, J and Liu, A M M (2006) A study on the relationship between organizational commitment and task performance in Chinese construction firms. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Xiao, H and Boyd, D (2006) Using personal construct theory to challenge knowledge management practice in construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Yang, J and Price, A D F (2006) Innovative design and construction solutions for improved therapeutic healing environments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Zhang, X; Austin, S A and Glass, J (2006) Linking individual and organisational values: A case study in UK construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

This list was generated on Sat Aug 22 01:02:48 2026 UTC.