Items where Year is 2005

Group by: Author(s) | Item Type | No Grouping
Number of items: 697.

Article

Abdul-Hadi, N H; Al-Sudairi, A and Alqahtani, S (2005) Prioritizing barriers to successful business process re-engineering (BPR) efforts in Saudi Arabian construction industry. Construction Management and Economics, 23(3), pp. 305-315. ISSN 01446193

Acar, E; Koçak, I; Sey, Y and Arditi, D (2005) Use of information and communication technologies by small and medium-sized enterprises (SMEs) in building construction. Construction Management and Economics, 23(7), pp. 713-722. ISSN 01446193

Adriaanse, A and Voordijk, H (2005) Interorganizational communication and ICT in construction projects: A review using metatriangulation. Construction Innovation, 5(3), pp. 159-177. ISSN 1471-4175

Akintoye, A and Chinyio, E (2005) Private finance initiative in the healthcare sector: Trends and risk assessment. Engineering, Construction and Architectural Management, 12(6), pp. 601-616. ISSN 0969-9988

Al-Hussein, M; Alkass, S and Moselhi, O (2005) Optimization algorithm for selection and on site location of mobile cranes. Journal of Construction Engineering and Management, 131(5), pp. 579-590. ISSN 0733-9364

Al-Kaisy, A and Nassar, K (2005) Nighttime construction issues revisited. Journal of Construction Research, 6(1), pp. 139-156. ISSN 1609-9451

Al-Muyeed, A and Afrin, R (2005) Effect of masonry infill for reducing the sway of RC frame using finite element modeling. Journal of Construction Research, 6(2), pp. 293-306. ISSN 1609-9451

Al-Sobiei, O S; Arditi, D and Polat, G (2005) Managing owner's risk of contractor default. Journal of Construction Engineering and Management, 131(9), pp. 973-978. ISSN 0733-9364

Al-Sobiei, O S; Arditi, D and Polat, G (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics, 23(4), pp. 423-430. ISSN 01446193

Altomonte, S (2005) CH2: lighting and physiology. Construction Economics and Building, 5(2), pp. 40-46. ISSN 2204-9029

Ang, G; Groosman, M and Scholten, N P M (2005) Dutch performance-based approach to building regulations and public procurement. Building Research & Information, 33(2), pp. 107-119. ISSN 0961-3218

Ankrah, N A and Langford, D A (2005) Architects and contractors: A comparative study of organizational cultures. Construction Management and Economics, 23(6), pp. 595-607. ISSN 01446193

Anumba, C; Dainty, A R J; Ison, S G and Sergeant, A (2005) The application of GIS to construction labour market planning. Construction Innovation, 5(4), pp. 219-230. ISSN 1471-4175

Aouad, G F; Lee, A and Wu, S (2005) ND modelling for collaborative working in construction. Architectural Engineering and Design Management, 1(1), pp. 33-44. ISSN 1745-2007

Arain, F M and Pheng, L S (2005) How design consultants perceive potential causes of variation orders for institutional buildings in Singapore. Architectural Engineering and Design Management, 1(3), pp. 181-196. ISSN 1745-2007

Aranda-Mena, G; Sher, W; Gameson, R and Ward, P (2005) Evolving trends in nD modelling: The 'construction planning workbench'. Architectural Engineering and Design Management, 1(2), pp. 111-126. ISSN 1745-2007

Arayici, Y and Aouad, G (2005) Computer integrated construction: An approach to requirements engineering. Engineering, Construction and Architectural Management, 12(2), pp. 194-215. ISSN 0969-9988

Arayici, Y; Aouad, G and Ahmed, V (2005) Requirements engineering for innovative integrated ICT systems for the construction industry. Construction Innovation, 5(3), pp. 179-200. ISSN 1471-4175

Arditi, D; Ayrancioglu, M and Shi, J J (2005) Worker safety issues in night-time highway construction. Engineering, Construction and Architectural Management, 12(5), pp. 487-501. ISSN 0969-9988

Arditi, D and Chotibhongs, R (2005) Issues in subcontracting practice. Journal of Construction Engineering and Management, 131(8), pp. 866-876. ISSN 0733-9364

Arif, A A and Karam, A H (2005) Architectural practices and IT: Local vs international. Journal of Engineering, Design and Technology, 3(2), pp. 155-163. ISSN 1726-0531

Asad, S and Dainty, A R J (2005) Job motivational factors for disparate occupational groups within the UK construction sector: A comparative analysis. Journal of Construction Research, 6(2), pp. 223-236. ISSN 1609-9451

Augenbroe, G and Park, C S (2005) Quantification methods of technical building performance. Building Research & Information, 33(2), pp. 159-172. ISSN 0961-3218

Aye, L and Fuller, R J (2005) An evaluation of a proposed ventilation system for melbourne's CH2 building. Construction Economics and Building, 5(2), pp. 47-57. ISSN 2204-9029

Aye, L and Fuller, R J (2005) The proposed heating and cooling system in the CH2 building and its impact on occupant productivity. Construction Economics and Building, 5(2), pp. 32-39. ISSN 2204-9029

Bakens, W; Foliente, G and Jasuja, M (2005) Engaging stakeholders in performance-based building: Lessons from the performance-based building (PeBBu) network. Building Research & Information, 33(2), pp. 149-158. ISSN 0961-3218

Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364

Bassioni, H A; Price, A D F and Hassan, T M (2005) Building a conceptual framework for measuring business performance in construction: An empirical evaluation. Construction Management and Economics, 23(5), pp. 495-507. ISSN 01446193

Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193

Berg, R and Hinze, J (2005) Theft and vandalism on construction sites. Journal of Construction Engineering and Management, 131(7), pp. 826-833. ISSN 0733-9364

Bergström, M and Stehn, L (2005) Benefits and disadvantages of ERP in industrialised timber frame housing in Sweden. Construction Management and Economics, 23(8), pp. 831-838. ISSN 01446193

Bernold, L E (2005) Automatic as-built generation with utility trenchers. Journal of Construction Engineering and Management, 131(6), pp. 740-747. ISSN 0733-9364

Bernold, L E (2005) Paradigm shift in construction education is vital for the future of our profession. Journal of Construction Engineering and Management, 131(5), pp. 533-539. ISSN 0733-9364

Blismas, N; Gibb, A and Pasquire, C (2005) Assessing project suitability for off-site production. Construction Economics and Building, 5(1), pp. 9-15. ISSN 2204-9029

Blismas, N G; Pendlebury, M; Gibb, A and Pasquire, C (2005) Constraints to the use of off-site production on construction projects. Architectural Engineering and Design Management, 1(3), pp. 153-162. ISSN 1745-2007

Bogus, S M; Molenaar, K R and Diekmann, J E (2005) Concurrent engineering approach to reducing design delivery time. Journal of Construction Engineering and Management, 131(11), pp. 1179-1185. ISSN 0733-9364

Bonnal, P; Gourc, D; Hameri, A P and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(8), pp. 797-814. ISSN 01446193

Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques. Building Research & Information, 33(4), pp. 347-352. ISSN 0961-3218

Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 3: Case studies of the use of techniques in the feedback portfolio. Building Research & Information, 33(4), pp. 361-375. ISSN 0961-3218

Bouchlaghem, D; Shang, H; Anumba, C J; Cen, M; Miles, J and Taylor, M (2005) ICT-enabled collaborative working environment for concurrent conceptual design. Architectural Engineering and Design Management, 1(4), pp. 261-280. ISSN 1745-2007

Brady, T; Davies, A and Gann, D (2005) Can integrated solutions business models work in construction? Building Research & Information, 33(6), pp. 571-579. ISSN 0961-3218

Bresnen, M; Edelman, L; Newell, S; Scarbrough, H and Swan, J (2005) Exploring social capital in the construction firm. Building Research & Information, 33(3), pp. 235-244. ISSN 0961-3218

Bresnen, M; Goussevskaia, A and Swan, J (2005) Implementing change in construction project organizations: Exploring the interplay between structure and agency. Building Research & Information, 33(6), pp. 547-560. ISSN 0961-3218

Briscoe, G (2005) Women and minority groups in UK construction: Recent trends. Construction Management and Economics, 23(10), pp. 1001-1005. ISSN 01446193

Bröchner, J; Josephson, P E and Alte, J (2005) Identifying management research priorities. Construction Management and Economics, 23(8), pp. 793-796. ISSN 01446193

Byrne, J; Clarke, L and Van Der Meer, M (2005) Gender and ethnic minority exclusion from skilled occupations in construction: A Western European comparison. Construction Management and Economics, 23(10), pp. 1025-1034. ISSN 01446193

Caplan, A S and Gilham, J (2005) Included against the odds: Failure and success among minority ethnic built-environment professionals in Britain. Construction Management and Economics, 23(10), pp. 1007-1015. ISSN 01446193

Carr, P G (2005) Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders. Journal of Construction Engineering and Management, 131(11), pp. 1165-1172. ISSN 0733-9364

Carrillo, P (2005) Lessons learned practices in the engineering, procurement and construction sector. Engineering, Construction and Architectural Management, 12(3), pp. 236-250. ISSN 0969-9988

Castañeda, J A; Tucker, R L and Haas, C T (2005) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Journal of Construction Engineering and Management, 131(7), pp. 799-807. ISSN 0733-9364

Cha, H S and O'Connor, J T (2005) Optimizing implementation of value management processes for capital projects. Journal of Construction Engineering and Management, 131(2), pp. 239-251. ISSN 0733-9364

Chan, A T S and Chan, E H W (2005) Impact of perceived leadership styles on work outcomes: Case of building professionals. Journal of Construction Engineering and Management, 131(4), pp. 413-422. ISSN 0733-9364

Chan, E H W; Suen, H C H and Chan, S L (2005) An integrated project extranet design prototype: E-AEC for architects, engineers and contractors in Hong Kong and Mainland China. Journal of Construction Research, 6(2), pp. 253-271. ISSN 1609-9451

Chan, J K W; Tam, C M and Cheung, R (2005) Monitoring financial health of contractors at the aftermath of the Asian economic turmoil: A case study in Hong Kong. Construction Management and Economics, 23(5), pp. 451-458. ISSN 01446193

Chan, J K W; Tam, C M and Cheung, R K C (2005) Construction firms at the crossroads in Hong Kong: Going insolvency or seeking opportunity. Engineering, Construction and Architectural Management, 12(2), pp. 111-124. ISSN 0969-9988

Chan, P; Cooper, R and Tzortzopoulos, P (2005) Organizational learning: Conceptual challenges from a project perspective. Construction Management and Economics, 23(7), pp. 747-756. ISSN 01446193

Chan, S L and Park, M (2005) Project cost estimation using principal component regression. Construction Management and Economics, 23(3), pp. 295-304. ISSN 01446193

Chan, W T; Chen, C; Messner, J I and Chua, D K H (2005) Interface management for China's build-operate-transfer projects. Journal of Construction Engineering and Management, 131(6), pp. 645-655. ISSN 0733-9364

Chang, Y H and Tang, B (2005) Trust, partnership and power in construction: Theory and applications in Hong Kong. Journal of Construction Procurement, 11(2), pp. 94-111.

Chantawit, D; Hadikusumo, B H W; Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: Visualizing project scheduling and safety planning. Construction Innovation, 5(2), pp. 99-114. ISSN 1471-4175

Chappells, H and Shove, E (2005) Debating the future of comfort: Environmental sustainability, energy consumption and the indoor environment. Building Research & Information, 33(1), pp. 32-40. ISSN 0961-3218

Chassiakos, A P and Sakellaropoulos, S P (2005) Time-cost optimization of construction projects with generalized activity constraints. Journal of Construction Engineering and Management, 131(10), pp. 1115-1124. ISSN 0733-9364

Chau, K W; Poon, S W; Wang, Y S and Lu, L L (2005) Technological progress and the productive efficiency of construction firms in Hong Kong, 1981-2001. Journal of Construction Research, 6(2), pp. 195-207. ISSN 1609-9451

Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387

Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: A comparative perspective. Construction Management and Economics, 23(9), pp. 913-925. ISSN 01446193

Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364

Chen, Z; Li, H and Wong, C T C (2005) Environalplanning: Analytic network process model for environmentally conscious construction planning. Journal of Construction Engineering and Management, 131(1), pp. 92-101. ISSN 0733-9364

Chen, Z; li, H; Kong, S C W and xu, Q (2005) A knowledge-driven management approach to environmental-conscious construction. Construction Innovation, 5(1), pp. 27-39. ISSN 1471-4175

Cheng, E W L and Li, H (2005) Analytic network process applied to project selection. Journal of Construction Engineering and Management, 131(4), pp. 459-466. ISSN 0733-9364

Cheng, E W L; li, H and yu, L (2005) The analytic network process (ANP) approach to location selection: A shopping mall illustration. Construction Innovation, 5(2), pp. 83-97. ISSN 1471-4175

Cheng, L and Tiong, R L K (2005) Minimum feasible tariff model for BOT water supply projects in Malaysia. Construction Management and Economics, 23(3), pp. 255-263. ISSN 01446193

Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364

Cheung, C K (2005) CH2 energy harvesting systems: Economic use and efficiency. Construction Economics and Building, 5(2), pp. 20-31. ISSN 2204-9029

Cheung, F Y K; Rowlinson, S; Jefferies, M and Lau, E (2005) Relationship contracting in Australia. Journal of Construction Procurement, 11(2),

Chileshe, N and Haupt, T C (2005) Modelling critical success factors of construction project management (CPM). Journal of Engineering, Design and Technology, 3(2), pp. 140-154. ISSN 1726-0531

Choudhary, R; Papalambros, P Y and Malkawi, A (2005) A hierarchical design optimization approach for meeting building performance targets. Architectural Engineering and Design Management, 1(1), pp. 57-76. ISSN 1745-2007

Chow, L J; Then, D and Skitmore, R M (2005) Characteristics of teamwork in Singapore construction projects. Journal of Construction Research, 6(1), pp. 15-46. ISSN 1609-9451

Chua, D K H and Goh, Y M (2005) Poisson model of construction incident occurrence. Journal of Construction Engineering and Management, 131(6), pp. 715-722. ISSN 0733-9364

Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364

Chung, J K H; Shen, G Q P; Leung, B Y P; Hao, J J L; Hills, M J; Fox, P W and Zou, P X W (2005) Using e-learning to deliver construction technology for undergraduate students. A case study in Hong Kong. Architectural Engineering and Design Management, 1(4), pp. 295-308. ISSN 1745-2007

Cicmil, S and Marshall, D (2005) Insights into collaboration at the project level: Complexity, social interaction and procurement mechanisms. Building Research & Information, 33(6), pp. 523-535. ISSN 0961-3218

Clements-Croome, D (2005) Designing the indoor environment for people. Architectural Engineering and Design Management, 1(1), pp. 45-55. ISSN 1745-2007

Cole, R J (2005) Building environmental assessment methods: Redefining intentions and roles. Building Research & Information, 33(5), pp. 455-467. ISSN 0961-3218

Cotton, A P; Sohail, M and Scott, R E (2005) Towards improved labour standards for construction of minor works in low income countries. Engineering, Construction and Architectural Management, 12(6), pp. 617-632. ISSN 0969-9988

Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(4), pp. 355-364. ISSN 01446193

Cox, R F; Issa, R R A and Koblegard, K (2005) Management's perception of key behavioral indicators for construction. Journal of Construction Engineering and Management, 131(3), pp. 368-376. ISSN 0733-9364

Crawford, R H (2005) Validation of the use of input-output data for embodied energy analysis of the Australian construction industry. Journal of Construction Research, 6(1), pp. 71-90. ISSN 1609-9451

Cuervo, J C and Pheng, L S (2005) Significance of internalization factors for Singapore transnational construction corporations. Construction Management and Economics, 23(2), pp. 147-162. ISSN 01446193

Curwell, S; Deakin, M; Cooper, I; Paskaleva-Shapira, K; Ravetz, J and Babicki, D (2005) Citizens' expectations of information cities: Implications for urban planning and design. Building Research & Information, 33(1), pp. 55-66. ISSN 0961-3218

Dainty, A R J; Bryman, A; Price, A D F; Greasley, K; Soetanto, R and King, N (2005) Project affinity: The role of emotional attachment in construction projects. Construction Management and Economics, 23(3), pp. 241-244. ISSN 01446193

Dainty, A R J; Ison, S G and Briscoe, G H (2005) The construction labour market skills crisis: The perspective of small-medium-sized firms. Construction Management and Economics, 23(4), pp. 387-398. ISSN 01446193

Dansoh, A (2005) Strategic planning practice of construction firms in Ghana. Construction Management and Economics, 23(2), pp. 163-168. ISSN 01446193

De Saram, D D and Tang, S L (2005) Pain and suffering costs of persons in construction accidents: Hong Kong experience. Construction Management and Economics, 23(6), pp. 645-658. ISSN 01446193

Delgado-Hernandez, D J and Aspinwall, E M (2005) Improvement tools in the UK construction industry. Construction Management and Economics, 23(9), pp. 965-977. ISSN 01446193

Dikmen, I; Birgonul, M T and Kiziltas, S (2005) Prediction of organizational effectiveness in construction companies. Journal of Construction Engineering and Management, 131(2), pp. 252-261. ISSN 0733-9364

Ding, G K C (2005) Developing a multicriteria approach for the measurement of sustainable performance. Building Research & Information, 33(1), pp. 3-16. ISSN 0961-3218

Du Plessis, C (2005) Action for sustainability: Preparing an African plan for sustainable building and construction. Building Research & Information, 33(5), pp. 405-415. ISSN 0961-3218

Dulaimi, M F (2005) The influence of academic education and formal training on the project manager's behavior. Journal of Construction Research, 6(1), pp. 179-193. ISSN 1609-9451

Dulaimi, M F; Nepal, M P and Park, M (2005) A hierarchical structural model of assessing innovation and project performance. Construction Management and Economics, 23(6), pp. 565-577. ISSN 01446193

Duncan, J (2005) Performance-based building: Lessons from implementation in New Zealand. Building Research & Information, 33(2), pp. 120-127. ISSN 0961-3218

Dunston, P S; Gambatese, J A and McManus, J F (2005) Assessing state transportation agency constructability implementation. Journal of Construction Engineering and Management, 131(5), pp. 569-578. ISSN 0733-9364

Dunston, P S and Wang, X (2005) Mixed reality-based visualization interfaces for architecture, engineering, and construction industry. Journal of Construction Engineering and Management, 131(12), pp. 1301-1309. ISSN 0733-9364

Dzeng, R J; Tserng, H P and Wang, W C (2005) Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. ISSN 0733-9364

Edwards, D J and Holt, G D (2005) Exposure to hand-arm vibration: Implications of new statutory requirements. Building Research & Information, 33(3), pp. 257-266. ISSN 0961-3218

Edwards, D J; Yang, J; Cabahug, R and Love, P E D (2005) Intelligence and maintenance proficiency: An examination of plant operators. Construction Innovation, 5(4), pp. 243-254. ISSN 1471-4175

Ekström, M A and Björnsson, H C (2005) Valuing flexibility in architecture, engineering, and construction information technology investments. Journal of Construction Engineering and Management, 131(4), pp. 431-438. ISSN 0733-9364

El-Diraby, T E and Kashif, K F (2005) Distributed ontology architecture for knowledge management in highway construction. Journal of Construction Engineering and Management, 131(5), pp. 591-603. ISSN 0733-9364

El-Diraby, T E and Wang, B (2005) Society portal: Integrating urban highway construction projects into the knowledge city. Journal of Construction Engineering and Management, 131(11), pp. 1196-1211. ISSN 0733-9364

El-Rayes, K and Hyari, K (2005) Conlight: Lighting design model for nighttime highway construction. Journal of Construction Engineering and Management, 131(4), pp. 467-476. ISSN 0733-9364

El-Rayes, K and Hyari, K (2005) Optimal lighting arrangements for nighttime highway construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1292-1300. ISSN 0733-9364

El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364

El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364

Elazouni, A M; Ali, A E and Abdel-Razek, R H (2005) Estimating the acceptability of new formwork systems using neural networks. Journal of Construction Engineering and Management, 131(1), pp. 33-41. ISSN 0733-9364

Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364

Eldin, N N and Mayfield, J (2005) Determination of most economical scrapers fleet. Journal of Construction Engineering and Management, 131(10), pp. 1109-1114. ISSN 0733-9364

Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364

Ellis, R C T; Wood, G D and Keel, D A (2005) Value management practices of leading UK cost consultants. Construction Management and Economics, 23(5), pp. 483-493. ISSN 01446193

Emmitt, S (2005) Integrating teaching and research in an architectural technology undergraduate model. Journal of Engineering, Design and Technology, 3(2), pp. 164-179. ISSN 1726-0531

Emsley, M (2005) A benefits analysis of partnering: A case study of a community primary school. Journal of Financial Management of Property and Construction, 10(1), pp. 69-79. ISSN 1366-4387

Enshassi, A; Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), pp. 115-125. ISSN 1366-4387

Fadhil Dulaimi, M (2005) The challenge of customer orientation in the construction industry. Construction Innovation, 5(1), pp. 3-12. ISSN 1471-4175

Fayek, A R and Oduba, A (2005) Predicting industrial construction labor productivity using fuzzy expert systems. Journal of Construction Engineering and Management, 131(8), pp. 938-941. ISSN 0733-9364

Ferreira Bastos, M; Loforte Ribeiro, F and Cardoso Teixeira, J (2005) Estimating of capital cost of underground car parking project. Journal of Financial Management of Property and Construction, 10(2), pp. 126-132. ISSN 1366-4387

Fisher, D J; Schluter, L and Toleti, P K (2005) Project management education and training process for career development. Journal of Construction Engineering and Management, 131(8), pp. 903-910. ISSN 0733-9364

Fortune, C and Cox, O (2005) Current practices in building project contract price forecasting in the UK. Engineering, Construction and Architectural Management, 12(5), pp. 446-457. ISSN 0969-9988

Francis, A and Skitmore, M (2005) Risk management within the electrical distribution supply industry in South East Queensland. Journal of Financial Management of Property and Construction, 10(1), pp. 45-54. ISSN 1366-4387

Fredericks, T K; Abudayyeh, O; Choi, S D; Wiersma, M and Charles, M (2005) Occupational injuries and fatalities in the roofing contracting industry. Journal of Construction Engineering and Management, 131(11), pp. 1233-1240. ISSN 0733-9364

Gambatese, J A; Behm, M and Hinze, J W (2005) Viability of designing for construction worker safety. Journal of Construction Engineering and Management, 131(9), pp. 1029-1036. ISSN 0733-9364

Gangwar, M and Goodrum, P M (2005) The effect of time on safety incentive programs in the US construction industry. Construction Management and Economics, 23(8), pp. 851-859. ISSN 01446193

Georgy, M E; Chang, L M and Zhang, L (2005) Prediction of engineering performance: A neurofuzzy approach. Journal of Construction Engineering and Management, 131(5), pp. 548-557. ISSN 0733-9364

Georgy, M E; Chang, L M and Zhang, L (2005) Utility-function model for engineering performance assessment. Journal of Construction Engineering and Management, 131(5), pp. 558-568. ISSN 0733-9364

Gibb, A; Hide, S; Haslam, R; Gyi, D; Pavitt, T; Atkinson, S and Duff, R (2005) Construction tools and equipment: their influence on accident causality. Journal of Engineering, Design and Technology, 3(1), pp. 12-23. ISSN 1726-0531

Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364

Glass, J (2005) A best practice process model for hybrid concrete construction. Construction Management and Economics, 23(2), pp. 169-184. ISSN 01446193

Glass, J and Pepper, C (2005) Perceptions of precast concrete cladding in the UK market. Architectural Engineering and Design Management, 1(4), pp. 233-246. ISSN 1745-2007

Gomes, V and Da Silva, M G (2005) Exploring sustainable construction: Implications from Latin America. Building Research & Information, 33(5), pp. 428-440. ISSN 0961-3218

Goodrum, P M and Dai, J (2005) Differences in occupational injuries, illnesses, and fatalities among Hispanic and non-Hispanic construction workers. Journal of Construction Engineering and Management, 131(9), pp. 1021-1028. ISSN 0733-9364

Graham, L D; Smith, S D and Dunlop, P (2005) Lognormal distribution provides an optimum representation of the concrete delivery and placement process. Journal of Construction Engineering and Management, 131(2), pp. 230-238. ISSN 0733-9364

Greed, C and Reeves, D (2005) Mainstreaming equality into strategic spatial policy making: Are town planners losing sight of gender? Construction Management and Economics, 23(10), pp. 1059-1070. ISSN 01446193

Green, S D; Fernie, S and Weller, S (2005) Making sense of supply chain management: A comparative study of aerospace and construction. Construction Management and Economics, 23(6), pp. 579-593. ISSN 01446193

Green, S D and May, S C (2005) Lean construction: Arenas of enactment, models of diffusion and the meaning of 'leanness'. Building Research & Information, 33(6), pp. 498-511. ISSN 0961-3218

Greenwood, D; Hogg, K and Kan, S (2005) Subcontractors' liability for project delay. Journal of Financial Management of Property and Construction, 10(2), pp. 107-114. ISSN 1366-4387

Gruneberg, S and Hughes, W P (2005) UK construction orders and output: A comparison of government and commercially available data 1995-2001. Journal of Financial Management of Property and Construction, 10(2), pp. 83-94. ISSN 1366-4387

Gunhan, S and Arditi, D (2005) Factors affecting international construction. Journal of Construction Engineering and Management, 131(3), pp. 273-282. ISSN 0733-9364

Gunhan, S and Arditi, D (2005) International expansion decision for construction companies. Journal of Construction Engineering and Management, 131(8), pp. 928-937. ISSN 0733-9364

Guo, K; Minchin, E and Ferragut, T (2005) The shift to warranties and performance specifications: What of method specifications? Construction Management and Economics, 23(9), pp. 953-963. ISSN 01446193

Hammond, D; Dempsey, J J; Szigeti, F and Davis, G (2005) Integrating a performance-based approach into practice: A case study. Building Research & Information, 33(2), pp. 128-141. ISSN 0961-3218

Han, S H; Diekmann, J E and Ock, J H (2005) Contractor's risk attitudes in the selection of international construction projects. Journal of Construction Engineering and Management, 131(3), pp. 283-292. ISSN 0733-9364

Hanna, A S; Menches, C L; Sullivan, K T and Sargent, J R (2005) Factors affecting absenteeism in electrical construction. Journal of Construction Engineering and Management, 131(11), pp. 1212-1218. ISSN 0733-9364

Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364

Hari, S; Egbu, C and Kumar, B (2005) A knowledge capture awareness tool: An empirical study on small and medium enterprises in the construction industry. Engineering, Construction and Architectural Management, 12(6), pp. 533-567. ISSN 0969-9988

Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364

Harty, C (2005) Innovation in construction: A sociology of technology approach. Building Research & Information, 33(6), pp. 512-522. ISSN 0961-3218

Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193

Haupt, T C; Munshi, M and Smallwood, J (2005) HIV and AIDS in South African construction: Is age nothing but a number? Construction Management and Economics, 23(1), pp. 107-119. ISSN 01446193

Hegazy, T; Elbeltagi, E and Zhang, K (2005) Keeping better site records using intelligent bar charts. Journal of Construction Engineering and Management, 131(5), pp. 513-521. ISSN 0733-9364

Hegazy, T and Zhang, K (2005) Daily windows delay analysis. Journal of Construction Engineering and Management, 131(5), pp. 505-512. ISSN 0733-9364

Heron, E; Bowen, P and Lincoln, D (2005) Vandalism: A product of environmental design? Journal of Financial Management of Property and Construction, 10(3), pp. 181-191. ISSN 1366-4387

Hes, D; Morrison, A W and Bates, M (2005) Assessment and selection of materials for Melbourne city Council House 2. Construction Economics and Building, 5(2), pp. 8-19. ISSN 2204-9029

Hildreth, J; Vorster, M and Martinez, J (2005) Reduction of short-interval GPS data for construction operations analysis. Journal of Construction Engineering and Management, 131(8), pp. 920-927. ISSN 0733-9364

Hinze, J (2005) Use of trench boxes for worker protection. Journal of Construction Engineering and Management, 131(4), pp. 494-500. ISSN 0733-9364

Hinze, J; Huang, X and Terry, L (2005) The nature of struck-by accidents. Journal of Construction Engineering and Management, 131(2), pp. 262-268. ISSN 0733-9364

Ho, S P (2005) Bid compensation decision model for projects with costly bid preparation. Journal of Construction Engineering and Management, 131(2), pp. 151-159. ISSN 0733-9364

Holt, G D and Edwards, D J (2005) Domestic builder selection in the uk housing repair and maintenance sector: a critique. Journal of Construction Research, 6(1), pp. 123-137. ISSN 1609-9451

Horman, M J and Kenley, R (2005) Quantifying levels of wasted time in construction with meta-analysis. Journal of Construction Engineering and Management, 131(1), pp. 52-61. ISSN 0733-9364

Horman, M J and Thomas, H R (2005) Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management, 131(7), pp. 834-843. ISSN 0733-9364

Hosein, R and Lewis, T M (2005) Quantifying the relationship between aggregate GDP and construction value added in a small petroleum rich economy: a case study of Trinidad and Tobago. Construction Management and Economics, 23(2), pp. 185-197. ISSN 01446193

Hossain, J B and Kusakabe, K (2005) Sex segregation in construction organizations in Bangladesh and Thailand. Construction Management and Economics, 23(6), pp. 609-619. ISSN 01446193

Hsieh, H H Y (2005) The 1990s Taiwan residential construction boom: A supply side interpretation. Construction Management and Economics, 23(3), pp. 265-284. ISSN 01446193

Humphreys, M A (2005) Quantifying occupant comfort: Are combined indices of the indoor environment practicable? Building Research & Information, 33(4), pp. 317-325. ISSN 0961-3218

Hutchings, M and Christofferson, J (2005) Factors leading to construction company success: Perceptions of small-volume residential contractors. International Journal of Construction Education and Research, 1(2), pp. 102-111. ISSN 1557-8771

Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364

Ibbs, W and Liu, M (2005) Improved measured mile analysis technique. Journal of Construction Engineering and Management, 131(12), pp. 1249-1256. ISSN 0733-9364

Ilozor, B D and Ilozor, D B (2005) Open-plan attributes and effective facilities management. Journal of Engineering, Design and Technology, 3(1), pp. 1-11. ISSN 1726-0531

Ilozor, B D and Ilozor, D B (2005) Openplan attributes and effective facilities management. Journal of Engineering, Design and Technology, 3(1), pp. 1-11. ISSN 1726-0531

Irizarry, J; Simonsen, K L and Abraham, D M (2005) Effect of safety and environmental variables on task durations in steel erection. Journal of Construction Engineering and Management, 131(12), pp. 1310-1319. ISSN 0733-9364

Islam, M D M and Faniran, O O (2005) Structural equation model of project planning effectiveness. Construction Management and Economics, 23(2), pp. 215-223. ISSN 01446193

Ivory, C (2005) The cult of customer responsiveness: Is design innovation the price of a client-focused construction industry? Construction Management and Economics, 23(8), pp. 861-870. ISSN 01446193

Jackson, B (2005) The perceptions of experienced construction practitioners regarding ethical transgressions in the construction industry. International Journal of Construction Education and Research, 1(2), pp. 112-128. ISSN 1557-8771

Jackson, B J (2005) Design-build education at associated schools of construction undergraduate programs. International Journal of Construction Education and Research, 1(2), pp. 75-88. ISSN 1557-8771

Jaselskis, E J; Gao, Z and Walters, R C (2005) Improving transportation projects using laser scanning. Journal of Construction Engineering and Management, 131(3), pp. 377-384. ISSN 0733-9364

Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364

Jin, X H and Ling, F Y Y (2005) Constructing a framework for building relationships and trust in project organizations: Two case studies of building projects in China. Construction Management and Economics, 23(7), pp. 685-696. ISSN 01446193

Jin, X H and Ling, F Y Y (2005) Model for fostering trust and building relationships in China's construction industry. Journal of Construction Engineering and Management, 131(11), pp. 1224-1232. ISSN 0733-9364

John, G A; Clements-Croome, D J; Fairey, V and Loy, H M (2005) Contextual prerequisites for the application of ILS principles to the building services industry. Engineering, Construction and Architectural Management, 12(4), pp. 307-328. ISSN 0969-9988

Kaatz, E; Root, D and Bowen, P (2005) Broadening project participation through a modified building sustainability assessment. Building Research & Information, 33(5), pp. 441-454. ISSN 0961-3218

Kadefors, A (2005) Fairness in interorganizational project relations: Norms and strategies. Construction Management and Economics, 23(8), pp. 871-878. ISSN 01446193

Kadefors, A (2005) Trust in construction: Cognitive traps as obstacles to collaborative contracting strategies. Journal of Construction Procurement, 11(2),

Kaiser, M J; Pulsipher, A G and Byrd, R C (2005) Cost of abrasive cutting in decommissioning operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 137-148. ISSN 0733-9364

Kaiser, M J; Pulsipher, A G and Martin, J (2005) Cost of site clearance and verification operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 117-126. ISSN 0733-9364

Kajewski, S L (2005) Multilevel formwork load distribution with posttensioned slabs. Journal of Construction Engineering and Management, 131(2), pp. 203-210. ISSN 0733-9364

Kale, S and Arditi, D (2005) Diffusion of computer aided design technology in architectural design practice. Journal of Construction Engineering and Management, 131(10), pp. 1135-1141. ISSN 0733-9364

Kampschroer, K and Heerwagen, J H (2005) The strategic workplace: Development and evaluation. Building Research & Information, 33(4), pp. 326-337. ISSN 0961-3218

Kashiwagi, D T and Massner, S (2005) Solving the construction craftperson skill shortage problem through construction undergraduate and graduate education. International Journal of Construction Education and Research, 1(2), pp. 89-101. ISSN 1557-8771

Kazaz, A and Birgonul, M T (2005) Determination of quality level in mass housing projects in Turkey. Journal of Construction Engineering and Management, 131(2), pp. 195-202. ISSN 0733-9364

Khalfan, M and Raja, N (2005) Improving construction process through integration and concurrent engineering. Construction Economics and Building, 5(1), pp. 58-66. ISSN 2204-9029

Khalfan, M M A; Anumba, C J and Carrillo, P M (2005) Concurrent engineering readiness assessment tool for construction. Architectural Engineering and Design Management, 1(3), pp. 163-179. ISSN 1745-2007

Kilian, J J and Gibson, G E (2005) Construction litigation for the U.S. Naval facilities engineering command, 1982-2002. Journal of Construction Engineering and Management, 131(9), pp. 945-952. ISSN 0733-9364

Kim, K and De La Garza, J M (2005) Critical path method with multiple calendars. Journal of Construction Engineering and Management, 131(3), pp. 330-342. ISSN 0733-9364

Kim, K and De La Garza, J M (2005) Evaluation of the resource-constrained critical path method algorithms. Journal of Construction Engineering and Management, 131(5), pp. 522-532. ISSN 0733-9364

Kim, W S; Minh Tam, N and Jung, D H (2005) Experimental study on strength of cement stabilized clay. Journal of Engineering, Design and Technology, 3(2), pp. 116-126. ISSN 1726-0531

Kim, Y; Kim, K and Shin, D (2005) Delay analysis method using delay section. Journal of Construction Engineering and Management, 131(11), pp. 1155-1164. ISSN 0733-9364

Kirkham, R J (2005) Re-engineering the whole life cycle costing process. Construction Management and Economics, 23(1), pp. 9-14. ISSN 01446193

Kirkham, R J and Boussabaine, A H (2005) Forecasting the residual service life of nhs hospital buildings: A stochastic approach. Construction Management and Economics, 23(5), pp. 521-529. ISSN 01446193

Kishk, M; Pollock, R; Atta, J and Power, L (2005) A structured model for performance assessment in property management. Journal of Financial Management of Property and Construction, 10(3), pp. 159-170. ISSN 1366-4387

Koch, C and Bendixen, M (2005) Multiple perspectives on organizing: Projects between tyranny and perforation. Building Research & Information, 33(6), pp. 536-546. ISSN 0961-3218

Koushki, P A; Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294. ISSN 01446193

Kristiansen, K; Emmitt, S and Bonke, S (2005) Changes in the Danish construction sector: The need for a new focus. Engineering, Construction and Architectural Management, 12(5), pp. 502-511. ISSN 0969-9988

Kululanga, G K and Price, A D F (2005) Measuring quality of writing of construction specifications. Journal of Construction Engineering and Management, 131(8), pp. 859-865. ISSN 0733-9364

Kumaraswamy, M M; Ling, F Y Y; Rahman, M M and Phng, S T (2005) Constructing relationally integrated teams. Journal of Construction Engineering and Management, 131(10), pp. 1076-1086. ISSN 0733-9364

Kumaraswamy, M M; Rahman, M M; Ling, F Y Y and Phng, S T (2005) Reconstructing cultures for relational contracting. Journal of Construction Engineering and Management, 131(10), pp. 1065-1075. ISSN 0733-9364

Lam, K C; Hu, T S and Ng, S T (2005) Using the principal component analysis method as a tool in contractor pre-qualification. Construction Management and Economics, 23(7), pp. 673-684. ISSN 01446193

Lam, K C; Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(2), pp. 127-145. ISSN 01446193

Larsen, G D (2005) Horses for courses: Relating innovation diffusion concepts to the stages of the diffusion process. Construction Management and Economics, 23(8), pp. 787-792. ISSN 01446193

Larsen, G D and Ballal, T M A (2005) The diffusion on innovations within a UKCI context: An explanatory framework. Construction Management and Economics, 23(1), pp. 81-91. ISSN 01446193

Larsson, N (2005) Regionalism and sustainable development: Genesis of SB04. Building Research & Information, 33(5), pp. 397-404. ISSN 0961-3218

Lau, E and Rowlinson, S (2005) The value base of trust for the construction industry. Journal of Construction Procurement, 11(1),

Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364

Lee, E B; Harvey, J T and Thomas, D (2005) Integrated design/construction/operations analysis for fast-track urban freeway reconstruction. Journal of Construction Engineering and Management, 131(12), pp. 1283-1291. ISSN 0733-9364

Lee, E B and Ibbs, C W (2005) Computer simulation model: Construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering and Management, 131(4), pp. 449-458. ISSN 0733-9364

Lee, H S; Ryu, H G; Yu, J H and Kim, J J (2005) Method for calculating schedule delay considering lost productivity. Journal of Construction Engineering and Management, 131(11), pp. 1147-1154. ISSN 0733-9364

Lee, S; Peña-Mora, F and Park, M (2005) Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, 131(8), pp. 890-902. ISSN 0733-9364

Lee, S H; Thomas, S R and Tucker, R L (2005) Web-based benchmarking system for the construction industry. Journal of Construction Engineering and Management, 131(7), pp. 790-798. ISSN 0733-9364

Lee, S H; Thomas, S R and Tucker, R L (2005) The relative impacts of selected practices on project cost and schedule. Construction Management and Economics, 23(5), pp. 545-553. ISSN 01446193

Leung, M Y; Ng, S T; Skitmore, M and Cheung, S O (2005) Critical stressors influencing construction estimators in Hong Kong. Construction Management and Economics, 23(1), pp. 33-44. ISSN 01446193

Leung, M Y; Olomolaiye, P; Chong, A and Lam, C C Y (2005) Impacts of stress on estimation performance in Hong Kong. Construction Management and Economics, 23(9), pp. 891-903. ISSN 01446193

Lewis, T M (2005) Public procurement and corruption in Trinidad and Tobago. Journal of Construction Procurement, 11(1),

Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2005) Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(5), pp. 459-471. ISSN 01446193

Lin, E T A and Wen, K P T (2005) Singapore's contractors' attitudes towards safety culture. Journal of Construction Research, 6(1), pp. 157-178. ISSN 1609-9451

Ling, F Y Y (2005) Global factors affecting margin-size of construction projects. Journal of Construction Research, 6(1), pp. 91-106. ISSN 1609-9451

Ling, F Y Y; Ibbs, C W and Cuervo, J C (2005) Entry and business strategies used by international architectural, engineering and construction firms in China. Construction Management and Economics, 23(5), pp. 509-520. ISSN 01446193

Ling, F Y Y and Kumaraswamy, M M (2005) The role of trust in team integration: A survey of contractors, consultants and clients in Singapore. Journal of Construction Procurement, 11(1),

Lingard, H (2005) Balancing study and paid work: The experiences of construction undergraduates in an Australian university. Construction Economics and Building, 5(1), pp. 41-47. ISSN 2204-9029

Lingard, H and Francis, V (2005) Does work-family conflict mediate the relationship between job schedule demands and burnout in male construction professionals and managers? Construction Management and Economics, 23(7), pp. 733-745. ISSN 01446193

Lingard, H and Francis, V (2005) The decline of the 'traditional' family: Work-life benefits as a means of promoting a diverse workforce in the construction industry of Australia. Construction Management and Economics, 23(10), pp. 1045-1057. ISSN 01446193

Lisø, K R; Kvande, T and Thue, J V (2005) High-performance weather-protective flashings. Building Research & Information, 33(1), pp. 41-54. ISSN 0961-3218

Liu, C and Song, Y (2005) Multifactor productivity measures of construction sectors using oecd input-output database. Journal of Construction Research, 6(2), pp. 209-222. ISSN 1609-9451

Liu, M and Ling, Y Y (2005) Modeling a contractor's markup estimation. Journal of Construction Engineering and Management, 131(4), pp. 391-399. ISSN 0733-9364

Liu, S L; Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(4), pp. 347-353. ISSN 01446193

Lorenz, D; Lützkendorf, T and Panek, A (2005) Sustainable construction in central/eastern Europe: Implications from SB04 in warsaw. Building Research & Information, 33(5), pp. 416-427. ISSN 0961-3218

Love, P E D and Edwards, D J (2005) Taking the pulse of UK construction project managers' health: Influence of job demands, job control and social support on psychological wellbeing. Engineering, Construction and Architectural Management, 12(1), pp. 88-101. ISSN 0969-9988

Love, P E D; Edwards, D J and Smith, J (2005) Contract documentation and the incidence of rework in projects. Architectural Engineering and Design Management, 1(4), pp. 247-259. ISSN 1745-2007

Love, P E D; Tse, R Y C and Edwards, D J (2005) Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management, 131(2), pp. 187-194. ISSN 0733-9364

Low, S P and Wu, M (2005) Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore. Construction Management and Economics, 23(8), pp. 815-829. ISSN 01446193

Lowe, D J and Leiringer, R (2005) Commercial management in project-based organisations. Journal of Financial Management of Property and Construction, 10(1), pp. 3-18. ISSN 1366-4387

Lueke, J S and Ariaratnam, S T (2005) Surface heave mechanisms in horizontal directional drilling. Journal of Construction Engineering and Management, 131(5), pp. 540-547. ISSN 0733-9364

Lützkendorf, T and Lorenz, D (2005) Sustainable property investment: Valuing sustainable buildings through property performance assessment. Building Research & Information, 33(3), pp. 212-234. ISSN 0961-3218

Lützkendorf, T and Speer, T M (2005) Alleviating asymmetric information in property markets: Building performance and product quality as signals for consumers. Building Research & Information, 33(2), pp. 182-195. ISSN 0961-3218

Macintosh, A and Steemers, K (2005) Ventilation strategies for urban housing: Lessons from a PoE case study. Building Research & Information, 33(1), pp. 17-31. ISSN 0961-3218

Malekzadeh, H; Edwards, D J and Harris, F C (2005) Simulating the ground freezing process: a decision support model. Journal of Construction Research, 6(1), pp. 107-121. ISSN 1609-9451

Matsumoto, I; Stapleton, J; Glass, J and Thorpe, T (2005) Developing a framework to measure organizational and employee skills development in a professional engineering design consultancy. Construction Innovation, 5(1), pp. 53-66. ISSN 1471-4175

Matsumoto, I T; Stapleton, J; Glass, J and Thorpe, T (2005) Use of process maps to develop a management briefing sheet for a design consultancy. Engineering, Construction and Architectural Management, 12(5), pp. 458-469. ISSN 0969-9988

Mawdesley, M; Hernandez, O and Al-Jibouri, S (2005) A decision making model for infrastructure projects selection in developing countries. Journal of Financial Management of Property and Construction, 10(3), pp. 135-146. ISSN 1366-4387

Mbabazi, A; Hegazy, T and Saccomanno, F (2005) Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131(10), pp. 1142-1144. ISSN 0733-9364

McDermott, P; Khalfan, M and Swan, W (2005) Trust in construction projects. Journal of Financial Management of Property and Construction, 10(1), pp. 19-32. ISSN 1366-4387

Meacham, B; Bowen, R; Traw, J and Moore, A (2005) Performance-based building regulation: Current situation and future needs. Building Research & Information, 33(2), pp. 91-106. ISSN 0961-3218

Miller, S; Haupt, T C and Chileshe, N (2005) Student perceptions of the first year civil engineering course content. Journal of Engineering, Design and Technology, 3(2), pp. 180-189. ISSN 1726-0531

Min, W and Pheng, L S (2005) EOQ with a price discount versus JIT purchasing: an alternative analysis in the ready-mixed concrete industry. Journal of Construction Research, 6(1), pp. 47-69. ISSN 1609-9451

Min, W and Pheng, L S (2005) Economic order quantity (EOQ) versus just-in-time (JIT) purchasing: An alternative analysis in the ready-mixed concrete industry. Construction Management and Economics, 23(4), pp. 409-422. ISSN 01446193

Mitropoulos, P; Abdelhamid, T S and Howell, G A (2005) Systems model of construction accident causation. Journal of Construction Engineering and Management, 131(7), pp. 816-825. ISSN 0733-9364

Mohamed, Y and AbouRizk, S (2005) Application of the theory of inventive problem solving in tunnel construction. Journal of Construction Engineering and Management, 131(10), pp. 1099-1108. ISSN 0733-9364

Mohamed, Y and AbouRizk, S (2005) Technical knowledge consolidation using theory of inventive problem solving. Journal of Construction Engineering and Management, 131(9), pp. 993-1001. ISSN 0733-9364

Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364

Moore, D R and Abadi, M (2005) Virtual team working and associated technologies within the UK construction industry. Architectural Engineering and Design Management, 1(1), pp. 21-32. ISSN 1745-2007

Morledge, R and Adnan, H (2005) The importance of trust to the success of joint venture projects. Journal of Construction Procurement, 11(2),

Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364

Motawa, I A (2005) A systematic approach to modelling change processes in construction projects. Construction Economics and Building, 5(1), pp. 23-31. ISSN 2204-9029

Naismith, N; Price, A D F; Dainty, A R J; Bryman, A; Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(2),

Naji, K K (2005) Virtual environments for improving construction site safety. Architectural Engineering and Design Management, 1(2), pp. 93-102. ISSN 1745-2007

Nassar, K M; Gunnarsson, H G and Hegab, M Y (2005) Using weibull analysis for evaluation of cost and schedule performance. Journal of Construction Engineering and Management, 131(12), pp. 1257-1262. ISSN 0733-9364

Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364

Navon, R and Berkovich, O (2005) Development and on-site evaluation of an automated materials management and control model. Journal of Construction Engineering and Management, 131(12), pp. 1328-1336. ISSN 0733-9364

Navon, R and Shpatnitsky, Y (2005) Field experiments in automated monitoring of road construction. Journal of Construction Engineering and Management, 131(4), pp. 487-493. ISSN 0733-9364

Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193

Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(4), pp. 399-408. ISSN 01446193

Nesan, L J (2005) Factors influencing tacit knowledge in construction. Construction Economics and Building, 5(1), pp. 48-57. ISSN 2204-9029

Newton, R and Ormerod, M (2005) Do disabled people have a place in the UK construction industry? Construction Management and Economics, 23(10), pp. 1071-1081. ISSN 01446193

Ng, S T; Kong, H and Luu, C D T (2005) Capitalising experiential knowledge for guiding construction procurement selection. Construction Economics and Building, 5(1), pp. 32-40. ISSN 2204-9029

Ng, S T; Skitmore, R M and Leung, T K C (2005) Manageability of stress among construction project participants. Engineering, Construction and Architectural Management, 12(3), pp. 264-282. ISSN 0969-9988

Ngowi, A B and Pienaar, E (2005) Trust factor in construction alliances. Building Research & Information, 33(3), pp. 267-278. ISSN 0961-3218

Nicol, F and Roaf, S (2005) Post-occupancy evaluation and field studies of thermal comfort. Building Research & Information, 33(4), pp. 338-346. ISSN 0961-3218

Nyström, J (2005) The definition of partnering as a wittgenstein family-resemblance concept. Construction Management and Economics, 23(5), pp. 473-481. ISSN 01446193

O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364

Obonyo, E; Anumba, C and Thorpe, T (2005) Apron: An agent-based specification and procurement system for construction products. Engineering, Construction and Architectural Management, 12(4), pp. 329-350. ISSN 0969-9988

Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387

Odubiyi, A O and Davidson, I E (2005) England and Wales electricity industry: experiences in deregulation. Journal of Engineering, Design and Technology, 3(1), pp. 24-29. ISSN 1726-0531

Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364

Omar, I and Mncwango, S (2005) Sanitary landfill energy harnessing and applications. Journal of Engineering, Design and Technology, 3(2), pp. 127-139. ISSN 1726-0531

Ormerod, M G and Newton, R A (2005) Moving beyond accessibility: The principles of universal (inclusive) design as a dimension in nD modelling of the built environment. Architectural Engineering and Design Management, 1(2), pp. 103-110. ISSN 1745-2007

Ozorhon, B; Dikmen, I and Talat Birgonul, M (2005) Organizational memory formation and its use in construction. Building Research & Information, 33(1), pp. 67-79. ISSN 0961-3218

Packham, G; Miller, C J; Thomas, B C and Brooksbank, D (2005) An examination of the management challenges faced by growing SCEs in South Wales. Construction Innovation, 5(1), pp. 13-25. ISSN 1471-4175

Park, H S; Thomas, S R and Tucker, R L (2005) Benchmarking of construction productivity. Journal of Construction Engineering and Management, 131(7), pp. 772-778. ISSN 0733-9364

Peansupap, V and Walker, D (2005) Exploratory factors influencing information and communication technology diffusion and adoption within Australian construction organizations: A micro analysis. Construction Innovation, 5(3), pp. 135-157. ISSN 1471-4175

Pheng, L S and Tan, J H K (2005) Integrating ISO 9001 quality management system and ISO 14001 environmental management system for contractors. Journal of Construction Engineering and Management, 131(11), pp. 1241-1244. ISSN 0733-9364

Phua, F T T (2005) Determining the relationship between fee structure and project performance between firms: An empirical study based on institutional and task environment perspectives. Construction Management and Economics, 23(1), pp. 45-56. ISSN 01446193

Polat, G and Arditi, D (2005) The JIT materials management system in developing countries. Construction Management and Economics, 23(7), pp. 697-712. ISSN 01446193

Powl, A and Skitmore, M (2005) Factors hindering the performance of construction project managers. Construction Innovation, 5(1), pp. 41-51. ISSN 1471-4175

Pretorius, F; so, W M and Chau, K W (2005) An analysis of variable rate residential mortgage prepayment in Hong Kong using aggregate data. Journal of Financial Management of Property and Construction, 10(3), pp. 147-158. ISSN 1366-4387

Pries, F and Dorée, A (2005) A century of innovation in the Dutch construction industry. Construction Management and Economics, 23(6), pp. 561-564. ISSN 01446193

Pryke, S D (2005) Towards a social network theory of project governance. Construction Management and Economics, 23(9), pp. 927-939. ISSN 01446193

Pulaski, M H and Horman, M J (2005) Continuous value enhancement process. Journal of Construction Engineering and Management, 131(12), pp. 1274-1282. ISSN 0733-9364

Pulaski, M H and Horman, M J (2005) Organizing constructability knowledge for design. Journal of Construction Engineering and Management, 131(8), pp. 911-919. ISSN 0733-9364

Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(4), pp. 365-375. ISSN 01446193

Rahman, M M and Kumaraswamy, M M (2005) Relational selection for collaborative working arrangements. Journal of Construction Engineering and Management, 131(10), pp. 1087-1098. ISSN 0733-9364

Reichstein, T; Salter, A J and Gann, D M (2005) Last among equals: A comparison of innovation in construction, services and manufacturing in the UK. Construction Management and Economics, 23(6), pp. 631-644. ISSN 01446193

Ren, Z; Carter, C D; Hassan, T M and Anumba, C J (2005) Trust building for SMEs through an e-engineering hub. Journal of Construction Procurement, 11(1),

Riley, D R; Diller, B E and Kerr, D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), pp. 953-962. ISSN 0733-9364

Riley, D R; Varadan, P; James, J S and Thomas, H R (2005) Benefit-cost metrics for design coordination of mechanical, electrical, and plumbing systems in multistory buildings. Journal of Construction Engineering and Management, 131(8), pp. 877-889. ISSN 0733-9364

Robinson, H S; Carrillo, P M; Anumba, C J and A-Ghassani, A M (2005) Review and implementation of performance management models in construction engineering organizations. Construction Innovation, 5(4), pp. 203-217. ISSN 1471-4175

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2005) Knowledge management practices in large construction organisations. Engineering, Construction and Architectural Management, 12(5), pp. 431-445. ISSN 0969-9988

Rojas, E M and Mukherjee, A (2005) General-purpose situational simulation environment for construction education. Journal of Construction Engineering and Management, 131(3), pp. 319-329. ISSN 0733-9364

Rooke, J and Clark, L (2005) Learning, knowledge and authority on site: A case study of safety practice. Building Research & Information, 33(6), pp. 561-570. ISSN 0961-3218

Roy, R; Low, M and Waller, J (2005) Documentation, standardization and improvement of the construction process in house building. Construction Management and Economics, 23(1), pp. 57-67. ISSN 01446193

Ruikar, K; Anumba, C J and Carrillo, P M (2005) End-user perspectives on use of project extranets in construction organisations. Engineering, Construction and Architectural Management, 12(3), pp. 222-235. ISSN 0969-9988

Sacks, R; Navon, R; Brodetskaia, I and Shapira, A (2005) Feasibility of automated monitoring of lifting equipment in support of project control. Journal of Construction Engineering and Management, 131(5), pp. 604-614. ISSN 0733-9364

Saurin, T A; Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(3), pp. 283-298. ISSN 0969-9988

Sawalhi, N and Enshassi, A (2005) Application of project time management tools and techniques to the construction industry in the Gaza Strip. Construction Economics and Building, 5(1), pp. 1-8. ISSN 2204-9029

Schexnayder, C; Knutson, K and Fente, J (2005) Describing a beta probability distribution function for construction simulation. Journal of Construction Engineering and Management, 131(2), pp. 221-229. ISSN 0733-9364

Senaratne, S; Kagioglou, M; Amaratunga, D; Baldry, D; Aouad, G and Bowden, A (2005) Research knowledge transfer into teaching in the built environment. Engineering, Construction and Architectural Management, 12(6), pp. 587-600. ISSN 0969-9988

Sexton, M and Barrett, P (2005) Performance-based building and innovation: Balancing client and industry needs. Building Research & Information, 33(2), pp. 142-148. ISSN 0961-3218

Sexton, M; Goulding, J; Zhang, X; Kagioglou, M; Aouad, G; Cooper, R and Barrett, P (2005) The role of the hycon design-support tool in elevating hybrid concrete as a design option for structural frames. Engineering, Construction and Architectural Management, 12(6), pp. 568-586. ISSN 0969-9988

Shang, H; Anumba, C J; Bouchlaghem, D M; Miles, J C; Cen, M and Taylor, M (2005) An intelligent risk assessment system for distributed construction teams. Engineering, Construction and Architectural Management, 12(4), pp. 391-409. ISSN 0969-9988

Shapira, A and Goldenberg, M (2005) AHP-based equipment selection model for construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1263-1273. ISSN 0733-9364

Shapira, A and Raz, Y (2005) Comparative analysis of shoring towers for high-clearance construction. Journal of Construction Engineering and Management, 131(3), pp. 293-301. ISSN 0733-9364

Shash, A A (2005) Financial analysis for replacement of construction equipment in Saudi Arabia. Construction Economics and Building, 5(1), pp. 16-22. ISSN 2204-9029

Shash, A A and Ahcom, J (2005) Organizational aspects of safety management subsystem. Journal of Construction Research, 6(2), pp. 237-252. ISSN 1609-9451

Shen, L Y and Wu, Y Z (2005) Risk concession model for build/operate/transfer contract projects. Journal of Construction Engineering and Management, 131(2), pp. 211-220. ISSN 0733-9364

Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364

Smith, J (2005) An approach to developing a performance brief at the project inception stage. Architectural Engineering and Design Management, 1(1), pp. 3-20. ISSN 1745-2007

Smyth, H (2005) Procurement push and marketing pull in supply chain management: The conceptual contribution of relationship marketing as a driver in project financial performance. Journal of Financial Management of Property and Construction, 10(1), pp. 33-44. ISSN 1366-4387

Smyth, H (2005) Trust in the design team. Architectural Engineering and Design Management, 1(3), pp. 211-223. ISSN 1745-2007

Smyth, H J and Thompson, N J (2005) Developing conditions of trust within a framework of trust. Journal of Construction Procurement, 11(2),

Son, J; Mattila, K G and Myers, D S (2005) Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), pp. 302-309. ISSN 0733-9364

Song, J; Fagerlund, W R; Haas, C T; Tatum, C B and Vanegas, J A (2005) Considering prework on industrial projects. Journal of Construction Engineering and Management, 131(6), pp. 723-733. ISSN 0733-9364

Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364

Spangenberg, S; Hannerz, H and Tüchsen, F (2005) Hospitalized injuries among bridge and tunnel construction workers. Construction Management and Economics, 23(3), pp. 237-240. ISSN 01446193

Spaulding, W M; Bridge, A and Skitmore, M (2005) The use of function analysis as the basis of value management in the Australian construction industry. Construction Management and Economics, 23(7), pp. 723-731. ISSN 01446193

Steele, A and Todd, S (2005) The future of the black and minority ethnic (BME) construction sector in England. Construction Management and Economics, 23(10), pp. 1017-1023. ISSN 01446193

Stewart, P; Robinson, J and Low, S (2005) The business case for sustainable design: the city of Melbourne CH2 project. Construction Economics and Building, 5(2), pp. 58-70. ISSN 2204-9029

Sturts, C S and Griffis, F H (2005) Addressing pricing: Value bidding for engineers and consultants. Journal of Construction Engineering and Management, 131(6), pp. 621-630. ISSN 0733-9364

Swaffield, J A (2005) Transient identification of defective trap seals. Building Research & Information, 33(3), pp. 245-256. ISSN 0961-3218

Swaffield, L M and Johnson, G A (2005) The financial benefits of implementing ISO 14001 within construction contracting organizations. Architectural Engineering and Design Management, 1(3), pp. 197-210. ISSN 1745-2007

Swan, W; McDermott, P; Khalfan, M M A; Cooper, R; Rees, C and Wood, G (2005) The Development of Trust Inventory. Journal of Construction Procurement, 11(1),

Tam, C M and Tong, T K L (2005) Multiple gmdh models for estimating resource requirements. Construction Innovation, 5(2), pp. 115-131. ISSN 1471-4175

Tam, C M; Tong, T K L; Lau, T C T and Chan, K K (2005) Selection of vertical formwork system by probabilistic neural networks models. Construction Management and Economics, 23(3), pp. 245-254. ISSN 01446193

Tamate, S; Suemasa, N and Katada, T (2005) Analyses of instability in mobile cranes due to ground penetration by outriggers. Journal of Construction Engineering and Management, 131(6), pp. 689-704. ISSN 0733-9364

Tang, S L; Ying, K C; Anson, M and Lu, M (2005) Rmcsim: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(1), pp. 15-31. ISSN 01446193

Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(3), pp. 251-263. ISSN 0969-9988

Tatum, C B (2005) Building better: Technical support for construction. Journal of Construction Engineering and Management, 131(1), pp. 23-32. ISSN 0733-9364

Teo, E A L; Ling, F Y Y and Ong, D S Y (2005) Fostering safe work behaviour in workers at construction sites. Engineering, Construction and Architectural Management, 12(4), pp. 410-422. ISSN 0969-9988

Thomas, H R; Riley, D R and Messner, J I (2005) Fundamental principles of site material management. Journal of Construction Engineering and Management, 131(7), pp. 808-815. ISSN 0733-9364

Titus, S and Bröchner, J (2005) Managing information flow in construction supply chains. Construction Innovation, 5(2), pp. 71-82. ISSN 1471-4175

Tookey, J E; Bowen, P A and Hardcastle, C (2005) Concurrent engineering: A comparison between the aerospace and construction industries. Journal of Engineering, Design and Technology, 3(1), pp. 44-55. ISSN 1726-0531

Trethewy, R W (2005) The effect of feedback on risk taking in the Australian construction industry. Journal of Engineering, Design and Technology, 3(2), pp. 109-115. ISSN 1726-0531

Trinius, W and Sjöström, C (2005) Service life planning and performance requirements. Building Research & Information, 33(2), pp. 173-181. ISSN 0961-3218

Tse, R Y C and Choy, L (2005) Is it training in construction industry useful? Journal of Construction Research, 6(1), pp. 1-13. ISSN 1609-9451

Tzortzopoulos, P; Sexton, M and Cooper, R (2005) Process models implementation in the construction industry: A literature synthesis. Engineering, Construction and Architectural Management, 12(5), pp. 470-486. ISSN 0969-9988

Ugwu, O O and Haupt, T C (2005) Key performance indicators for infrastructure sustainability: a comparative study between Hong Kong and South Africa. Journal of Engineering, Design and Technology, 3(1), pp. 30-43. ISSN 1726-0531

Uwakweh, B O (2005) Effect of foremen on construction apprentice. Journal of Construction Engineering and Management, 131(12), pp. 1320-1327. ISSN 0733-9364

Walsh, K D; Sawhney, A and Brown Iv, A (2005) International comparison of cost for the construction sector: Purchasing power parity. Journal of Construction Engineering and Management, 131(2), pp. 160-167. ISSN 0733-9364

Way, M and Bordass, B (2005) Making feedback and post-occupancy evaluation routine 2: Soft landings: involving design and building teams in improving performance. Building Research & Information, 33(4), pp. 353-360. ISSN 0961-3218

Weinstein, M; Gambatese, J and Hecker, S (2005) Can design improve construction safety? Assessing the impact of a collaborative safety-in-design process. Journal of Construction Engineering and Management, 131(10), pp. 1125-1134. ISSN 0733-9364

Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193

Wibowo, A and Kochendörfer, B (2005) Financial risk analysis of project finance in Indonesian toll roads. Journal of Construction Engineering and Management, 131(9), pp. 963-972. ISSN 0733-9364

Williams, T P (2005) Bidding ratios to predict highway project costs. Engineering, Construction and Architectural Management, 12(1), pp. 38-51. ISSN 0969-9988

Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364

Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193

Wong, J T Y; Hui, E C M; Seabrooke, W and Raftery, J (2005) A study of the Hong Kong property market: Housing price expectations. Construction Management and Economics, 23(7), pp. 757-765. ISSN 01446193

Wong, P S P; Cheung, S O and Ho, P K M (2005) Contractor as trust initiator in construction partnering: prisoner's dilemma perspective. Journal of Construction Engineering and Management, 131(10), pp. 1045-1053. ISSN 0733-9364

Wood, G D and Ellis, R C T (2005) Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(3), pp. 317-325. ISSN 01446193

Wu, X and Zhang, Z (2005) Input-output analysis of the Chinese construction sector. Construction Management and Economics, 23(9), pp. 905-912. ISSN 01446193

Xenidis, Y and Angelides, D (2005) The financial risks in build-operate-transfer projects. Construction Management and Economics, 23(4), pp. 431-441. ISSN 01446193

Xenidis, Y and Angelides, D (2005) The legal risks in build-operate-transfer projects. Journal of Construction Research, 6(2), pp. 273-292. ISSN 1609-9451

Xu, T; Tiong, R L K; Chew, D A S and Smith, N J (2005) Development model for competitive construction industry in the people's republic of China. Journal of Construction Engineering and Management, 131(7), pp. 844-853. ISSN 0733-9364

Yang, I T (2005) Chance-constrained time-cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), pp. 1002-1012. ISSN 0733-9364

Yean Yng Ling, F (2005) Models for predicting quality of building projects. Engineering, Construction and Architectural Management, 12(1), pp. 6-20. ISSN 0969-9988

Yilmaz, N and Donaldson, A B (2005) Consideration of wind barriers for an inner courtyard. Architectural Engineering and Design Management, 1(4), pp. 281-293. ISSN 1745-2007

Yiu, C Y; Ho, H K; Lo, S M and Hu, B Q (2005) Performance evaluation for cost estimators by reliability interval method. Journal of Construction Engineering and Management, 131(1), pp. 108-116. ISSN 0733-9364

Yu, W D and Lo, S S (2005) Time-dependent construction social costs model. Construction Management and Economics, 23(3), pp. 327-337. ISSN 01446193

Zayed, T M (2005) Productivity and cost assessment for continuous flight auger piles. Journal of Construction Engineering and Management, 131(6), pp. 677-688. ISSN 0733-9364

Zayed, T M and Halpin, D W (2005) Deterministic models for assessing productivity and cost of bored piles. Construction Management and Economics, 23(5), pp. 531-543. ISSN 01446193

Zayed, T M and Halpin, D W (2005) Pile construction productivity assessment. Journal of Construction Engineering and Management, 131(6), pp. 705-714. ISSN 0733-9364

Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364

Zayed, T M; Halpin, D W and Basha, I M (2005) Productivity and delays assessment for concrete batch plant-truck mixer operations. Construction Management and Economics, 23(8), pp. 839-850. ISSN 01446193

Zhang, H and Tam, C M (2005) Consideration of break in modeling of construction processes. Engineering, Construction and Architectural Management, 12(4), pp. 373-390. ISSN 0969-9988

Zhang, J; Eastham, D L and Bernold, L E (2005) Waste-based management in residential construction. Journal of Construction Engineering and Management, 131(4), pp. 423-430. ISSN 0733-9364

Zhang, X (2005) Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects. Journal of Construction Engineering and Management, 131(10), pp. 1054-1064. ISSN 0733-9364

Zhang, X (2005) Criteria for selecting the private-sector partner in public-private partnerships. Journal of Construction Engineering and Management, 131(6), pp. 631-644. ISSN 0733-9364

Zhang, X (2005) Critical success factors for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 3-14. ISSN 0733-9364

Zhang, X (2005) Financial viability analysis and capital structure optimization in privatized public infrastructure projects. Journal of Construction Engineering and Management, 131(6), pp. 656-668. ISSN 0733-9364

Zhang, X (2005) Paving the way for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 71-80. ISSN 0733-9364

Zhang, X; Sexton, M G; Goulding, J S; Aouad, G and Kagioglou, M (2005) Performance modelling for the design of a hybrid concrete structural frame. Architectural Engineering and Design Management, 1(2), pp. 83-91. ISSN 1745-2007

Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(1), pp. 81-91. ISSN 0733-9364

Zou, P X W and Roslan, B A (2005) Different perspectives towards using web-based project management systems in construction: Large enterprises versus small- and medium-sized enterprises. Architectural Engineering and Design Management, 1(2), pp. 127-143. ISSN 1745-2007

li, H; yu, L and Cheng, E W L (2005) A GIS-based site selection system for real estate projects. Construction Innovation, 5(4), pp. 231-241. ISSN 1471-4175

ng, S T (2005) Performance of engineering consultants in ISO 9000-based quality management systems implementation. Engineering, Construction and Architectural Management, 12(6), pp. 519-532. ISSN 0969-9988

Thesis

Abadi, M (2005) Issues and challenges in communication within design teams in the construction industry: Investigation the use of virtual teams and information and communication technologies in the UK construction industry. PhD thesis, University of Manchester, UK.

Abanomi, W M (2005) Environmental design of prototype school buildings in hot, arid regions with special reference to Riyadh, Saudi Arabia. PhD thesis, Cardiff University, UK.

Abidin, N Z (2005) Using value management to improve the consideration of sustainability within construction. PhD thesis, Loughborough University, UK.

Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects. PhD thesis, Northumbria University, UK.

Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK. PhD thesis, University of Salford, UK.

Al-Atawi, S (2005) An ICT framework to improve the tendering process in the governmental construction sector in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.

Al-Qalyuby, H A (2005) Inductive learning methodology using OSHA construction accident and citation data. PhD thesis, Wayne State University, USA.

Altuglu, V (2005) Essays on infrastructure development subsidization by product firms. PhD thesis, Columbia University, USA.

Alves, T d C L (2005) Buffering practices in HVAC ductwork supply chains. PhD thesis, University of California, Berkeley, USA.

Anagnostou, E (2005) Investigation of risk management and uncertainty in Athens 2004 Olympic games: The Equestrian Centre case study. PhD thesis, University College London, UK.

Andres, L A (2005) The impact of privatization on firms in the infrastructure sector in latin American countries. PhD thesis, University of Chicago, USA.

Araujo, Luís Otávio Cocito de (2005) Method to propose directions improving labor productivity in the steel reinforcement activities. PhD thesis, Universidade de São Paulo, Brazil.

Awad, A M (2005) The interaction between project finance of a large-scale construction project and macroeconomic indicators and policies. PhD thesis, University of Nottingham, UK.

Aziz, Z (2005) Context-aware information delivery for mobile construction workers. PhD thesis, Loughborough University, UK.

Bakogiannis, A (2005) Managing stakeholders: A case study in Athens, Greece. PhD thesis, University College London, UK.

Bavi, R (2005) The development of a model design-build specification document for educational facilities construction projects. EdD thesis, Wilmington College (Delaware), USA.

Beheiry, S M A (2005) Examining the impact of corporate commitment to sustainability. PhD thesis, University of Texas at Austin, USA.

Benne, B C (2005) Managing AEC project organizations at the edge of chaos: An analysis of AEC projects' adaptive capacity from a living systems perspective. PhD thesis, University of California, Berkeley, USA.

Bennett, W J (2005) Experiences of women in the nontraditional skilled construction trades. PhD thesis, Walden University, USA.

Beynon, K S (2005) Dispute resolution and access to justice, with particular reference to the construction industry in the United Kingdom. PhD thesis, Swansea University, UK.

Bohne, R A (2005) Eco-efficiency and performance strategies in construction and demolition waste recycling systems. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Bowden, S L (2005) Application of mobile IT in construction. EngD thesis, Loughborough University, UK.

Brilakis, I (2005) Content based integration of construction site images in AEC/FM model based systems. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Butler, C J (2005) The relationship between emotional intelligence and transformational leadership behavior in construction industry leaders. PhD thesis, University of Colorado at Boulder, USA.

Carroll, Steven Paige (2005) Risk-based approach to on-site wastewater treatment system siting design and management. PhD thesis, Queensland University of Technology, Australia.

Carter, K (2005) ConSus: a decision support tool for the procurement of sustainable social housing. PhD thesis, Heriot-Watt University, UK.

Champion, R (2005) Acceleration in construction and engineering contracts. PhD thesis, University of London, UK.

Chan, P W (2005) An interpretivistic approach to understand the factors that affect construction labour productivity. PhD thesis, Heriot-Watt University, UK.

Chan, T S A (2005) The impact of subordinates' professionalism on leadership effectiveness in the construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chen, C (2005) Entry strategies for international construction markets. PhD thesis, Pennsylvania State University, USA.

Chen, P (2005) An interpretive comparison of Chinese and western conceptions of project management work. PhD thesis, Cranfield University, UK.

Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.

Cheng, Y (2005) Development of bridge management systems using fuzzy case-based reasoning. PhD thesis, Kansas State University, USA.

Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited. PhD thesis, Queensland University of Technology, Australia.

Chong, W K O (2005) Construction production rate information system for highway projects. PhD thesis, University of Texas at Austin, USA.

Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.

Chow, D H C (2005) Effects of future climate change and near-extreme weather on office building in the UK. PhD thesis, University of Manchester, UK.

Cui, Q (2005) A dynamic model for profitability analysis of construction firms: Towards complexity, learning, and uncertainty. PhD thesis, Purdue University, USA.

Davis, Peter Rex (2005) Application of relationship marketing to construction. PhD thesis, RMIT University, Australia.

Delgado-Hernández, D J (2005) A framework for building quality into construction projects. PhD thesis, University of Birmingham, UK.

Doğan, S Z (2005) Using machine learning techniques for early cost prediction of structural systems of buildings. PhD thesis, Izmir Institute of Technology, Turkey.

Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.

El-Hasia, A M (2005) The effects of state's construction procurement policy implementation on the outcome of local construction projects: the Libyan case. PhD thesis, University of Salford, UK.

Eliufoo, H K (2005) Knowledge creation and transfer in construction organisations in Tanzania. PhD thesis, KTH Royal Institute of Technology, Sweden.

Emhemed, A E (2005) Comprehensive approach to housing legislation: with reference to housing in Libya. PhD thesis, Heriot-Watt University, UK.

Ergen, E (2005) Formalization of life-cycle data management of engineered-to-order components using advanced tracking technologies. PhD thesis, Carnegie Mellon University, USA.

Fahmy, Sami W (2005) Comparative analysis of expected and actual performance of public design-build projects. PhD thesis, University of Calgary, Canada.

Faith-Ell, C (2005) The application of environmental requirements in procurement of road maintenance in Sweden. PhD thesis, KTH Royal Institute of Technology, Sweden.

Fee, S T (2005) Sustainable construction practices: Contractors' perceptions of awareness and participation. PhD thesis, Indiana State University, USA.

Fergusson, Hugh (2005) The strategic management of environmental issues in construction. PhD thesis, University of Strathclyde, UK.

Fernie, S (2005) Making sense of supply chain management in UK construction organisations: theory versus practice. PhD thesis, Loughborough University, UK.

Ferreira, Sérgio Leal (2005) Proposal of IFC model extension with ies LM-63 contribution: Luminaire in building lifecycle. PhD thesis, Universidade de São Paulo, Brazil.

Franco, L A (2005) Problem structuring methods for collaboration: A conceptual development, with an application to a construction partnership in the UK. PhD thesis, London School of Economics and Political Science, UK.

Gielingh, W F (2005) Improving the performance of construction by the acquisition, organization and use of knowledge: A theory and method for cognitive engineering, construction and lifecycle management. PhD thesis, Delft University of Technology, Netherlands.

Gluch, P (2005) Building green: perspectives on environmental mangagement in construction. PhD thesis, Chalmers University of Technology, Sweden.

Goh, Y M (2005) A case-based reasoning approach to construction safety risk assessment. PhD thesis, National University of Singapore, Singapore.

Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.

Gunderson, D E (2005) Needs assessment: Construction management doctoral programs in the United States. PhD thesis, Colorado State University, USA.

Hager, C J (2005) Developing standards for undergraduate university construction education internship programs. PhD thesis, Texas A&M University, USA.

Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. PhD thesis, Purdue University, USA.

Harmansah, O (2005) Spatial narratives, commemorative practices and the building project: New urban foundations in upper syro-mesopotamia during the early iron age. PhD thesis, University of Pennsylvania, USA.

Hassan, P F (2005) A best practice framework for training UK construction site managers. PhD thesis, Sheffield Hallam University, UK.

Herzog, Florian (2005) Strategic portfolio management for long-term investments: An optimal control approach. PhD thesis, ETH Zürich, Switzerland.

Hong, T (2005) Life-cycle cost assessment model of composite materials in construction. PhD thesis, Purdue University, USA.

Horii, T (2005) Impact of multiple normative systems on the organizational performance of international joint ventures. PhD thesis, Stanford University, USA.

Huang, C (2005) The development of an integrated paradigm and a decision support framework for IT innovation adoption. Unpublished PhD thesis, University of Reading, UK.

Humphrey, S D (2005) Construction procurement and profit: an analysis of the relationship from a contractor's perspective. PhD thesis, Loughborough University, UK.

Ibrahim Mahmoud, M M (2005) An xml initiative of transferring architectural information to the construction site based on the BIM object concept. PhD thesis, Illinois Institute of Technology, USA.

Ireland, P N (2005) Supply chain management in construction: an analysis of the appropriateness of proactive supply chain management thinking for the construction industry. PhD thesis, University of Birmingham, UK.

Irizarry, J (2005) Safety issues in steel erection: Impact on task durations and risk perception of ironworkers. PhD thesis, Purdue University, USA.

James, Ian E (2005) A study of ethical responses to contemporary cultural influences in the workplace: In particular the construction industry in Queensland with implications for vocational education and training. PhD thesis, Griffith University, Australia.

Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction. PhD thesis, University of Dundee, UK.

Jen, H (2005) Web-based construction process simulation framework. PhD thesis, Purdue University, USA.

Jeong, K S (2005) Good practice transfer within small construction specialist trade contractors. PhD thesis, University of Salford, UK.

Jiang, A (2005) A decision support model for cost and activity-based performance measurement in steel construction. PhD thesis, University of Florida, USA.

Jordan, M R C (2005) The design, use and implementation of maintenance management systems and pavement management systems for whole life costing. Unpublished PhD thesis, Curtin University of Technology, Australia.

Kam, C K H (2005) Dynamic decision breakdown structure: Ontology, methodology, and framework for information management in support of decision-enabling tasks in the building industry. PhD thesis, Stanford University, USA.

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kaya, S (2005) Development of a classification system for client FM organisations in the United Kingdom. PhD thesis, University of Salford, UK.

Kelly, J R (2005) Managing client value at the strategic briefing stage of construction projects. PhD thesis, Heriot-Watt University, UK.

Kennedy, N F (2005) The ethos of architects towards an analysis of architectural practice in Turkey. PhD thesis, Middle East Technical University, Turkey.

Kim, Jong Jin (2005) A study of the externalities of reconstruction projects in neighbourhood residential markets. PhD thesis, University of New South Wales, Australia.

Kiviniemi, A (2005) Requirements management interface to building product models. PhD thesis, Stanford University, USA.

Koskelo, T M (2005) A method for strategic technical life cycle management of real estates. DSc(Tech) thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Laepple, E S (2005) Exploring project collaboration systems in the building industry. PhD thesis, Texas A&M University, USA.

Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. PhD thesis, Cardiff University, UK.

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Larsen, G D (2005) A polymorphic framework for understanding the diffusion of innovations. Unpublished PhD thesis, University of Reading, UK.

Lau, H-l (2005) Trust relations in the construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Law, M D (2005) An investigation into the utilization of cost variance along with information technology by Pennsylvania home building firms. PhD thesis, Pennsylvania State University, USA.

Lee, J (2005) Value analysis of Wi-Fi agent functions in construction. PhD thesis, North Carolina State University, USA.

Lee, J S (2005) Developing spatio-temporal models for retrofit and reconstruction strategy under unscheduled events. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Liang, L (2005) Small project benchmarking. PhD thesis, University of Texas at Austin, USA.

Lin, K-Y (2005) Knowledge-assisted retrieval of online product information in A/E/C (architecture/engineering/construction). PhD thesis, University of Illinois at Urbana-Champaign, USA.

Liu, J (2005) Organisational learning of risk management for Chinese contractors. PhD thesis, University of Reading, UK.

Liu, Yu Ming (2005) A holistic approach to developing generic vs. regionally specific frameworks for sustainable building tools. PhD thesis, University of New South Wales, Australia.

Lu, S L (2005) A theory of innovation in small knowledge-intensive professional service firms. PhD thesis, University of Salford, UK.

Lundin, J A (2005) Safety in case of fire: The effect of changing regulations. PhD thesis, Lund University, Sweden.

Magent, C S (2005) A process and competency-based approach to high performance building design. PhD thesis, Pennsylvania State University, USA.

Mamantzis, Dimitrios E (2005) Successful project leadership: An analysis of the Greek construction market. PhD thesis, University College London, UK.

Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance. PhD thesis, University of Manchester, UK.

Marteinsson, B (2005) Service life estimation in building design: A development of the factor method. PhD thesis, KTH Royal Institute of Technology, Sweden.

Melia, K (2005) Exploring and modelling the process of change management in construction organisations. PhD thesis, University of Dundee, UK.

Meniru, K C U (2005) Computer-aided conceptual building design. PhD thesis, Concordia University, Canada.

Milani, B (2005) Building materials in a green economy: Community-based strategies for dematerialization. PhD thesis, University of Toronto, Canada.

Mohundro, W R (2005) Lease purchase financing: The processes and impact on new school construction in Texas. EdD thesis, University of North Texas, USA.

Mojahed, S (2005) A project improvement system for effective management of construction projects. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Mora, R (2005) Representation and reasoning for integrated conceptual design of building structures. PhD thesis, Concordia University, Canada.

Moylan, W A (2005) Building ethics in construction partnerships: An analysis of values-based leadership. PhD thesis, Capella University, USA.

Mukherjee, A (2005) A multi-agent framework for general purpose situational simulations in construction management. PhD thesis, University of Washington, USA.

Munifi, A (2005) An analysis of construction demand in Saudi Arabia. PhD thesis, University College London, UK.

Mutti, C d N (2005) The drivers of Brazilian contractors' competitiveness in the international market. PhD thesis, University of Reading, UK.

Najib, T (2005) Investigation of success factors for smaller engineering firms. PhD thesis, Wayne State University, USA.

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.

Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. PhD thesis, University of Alberta, Canada.

Noakes, J D (2005) Under the radar: Defence Construction (1951) Limited and military infrastructure in Canada, 1950–1965. PhD thesis, Carleton University, Canada.

O'Sullivan, D T J (2005) Improving building performance by tracking performance metrics using an IFC data model. PhD thesis, University College Cork, Ireland.

Ojiako, G U (2005) Project failures: A comparative study of information and communication technologies (ICT) and construction projects. PhD thesis, University of Northumbria at Newcastle, UK.

Oliveira, Otávio José de (2005) Management model for small building design firms. PhD thesis, Universidade de São Paulo, Brazil.

Orr, R J (2005) Unforeseen conditions and costs on global projects: Learning to cope with unfamiliar institutions, embeddedness and emergent uncertainty. PhD thesis, Stanford University, USA.

Osborne, A N (2005) Social conflict in construction-related inter-organizational collectives: A comparative analysis and structural equation model. PhD thesis, Northumbria University, UK.

Panagiotakopoulos, P D (2005) A systems and cybernetics approach to corporate sustainability in construction. PhD thesis, Heriot-Watt University, UK.

Panthaworn, P (2005) An exploratory study of motivation of management personnel in the heavy construction industry. PhD thesis, University of Texas at Austin, USA.

Pepper, C (2005) A critical evaluation of diversity and equality in the UK construction sector. PhD thesis, Loughborough University, UK.

Petersen, A K (2005) Integrating risk management into the undergraduate construction management curriculum: An investigation into the effect of zero tolerance, 360-degree feedback and competition within a world wide web assisted construction project-based learning environmen. PhD thesis, University of Portsmouth, UK.

Poh, Y P (2005) Knowledge-based integrated project duration-cost risk simulation model. PhD thesis, London South Bank University, UK.

Price, M (2005) State prevailing wage laws and construction labor markets. PhD thesis, University of Utah, USA.

Pritchard, C (2005) Skin cancer prevention in the house building industry. PhD thesis, Nottingham Trent University, UK.

Pulaski, M H (2005) The alignment of sustainability and constructability: A continuous value enhancement process. PhD thesis, Pennsylvania State University, USA.

Pyeon, J-H (2005) Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance. PhD thesis, University of Florida, USA.

Pérez, Z G (2005) Appropriate designs and appropriating irrigation systems : Irrigation infrastructure development and users' management capability in Bolivia. PhD thesis, Wageningen University and Research, Netherlands.

Rechenthin, D E (2005) Project management and safety: Attribution theory as it applies to project safety. DBA thesis, Nova Southeastern University, USA.

Reichert, J (2005) Will change management master the challenge of introducing the Eurocodes to the UK? PhD thesis, University of London, University College London, UK.

Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. PhD thesis, Texas A&M University, USA.

Roshani, D (2005) Integrated collaborative building design using internet technology. PhD thesis, University of Nottingham, UK.

Ross, A D (2005) A model of contingency factors affecting contractors' economic organisation of projects. PhD thesis, University of Salford, UK.

Salgado, C A (2005) Construction project organizational structuring. PhD thesis, University of Maryland, College Park, USA.

Salminen, J (2005) Measuring performance and determining success factors of construction sites. PhD thesis, Helsinki University of Technology, Finland.

Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. PhD thesis, University of Salford, UK.

Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering. PhD thesis, University of Alberta, Canada.

Soliman, E M (2005) Delay hierarchy propagation model. PhD thesis, University of Plymouth, UK.

Song, J (2005) Tracking the location of materials on construction projects. PhD thesis, University of Texas at Austin, USA.

Srour, I M (2005) A linear programming approach to optimize strategic investment in the construction workforce. PhD thesis, University of Texas at Austin, USA.

Stenis, J (2005) Industrial management models with emphasis on construction waste. PhD thesis, Lund University, Sweden.

Sultan, Basel M (2005) The construction industry in Yemen: Towards economic sustainability. PhD thesis, Queensland University of Technology, Australia.

Sylvie, J R (2005) Developing best practices for industrial project life cycle security and a methodology for measuring implementation. PhD thesis, University of Texas at Austin, USA.

Takim, R (2005) A framework for successful construction project performance. PhD thesis, Glasgow Caledonian University, UK.

Tan, J Y (2005) Coordinated budget allocation in multi-district highway agencies. PhD thesis, National University of Singapore, Singapore.

Tang, Z (2005) Developing complete conditional probability tables from fractional data for Bayesian belief networks in engineering decision making. PhD thesis, University of Toronto, Canada.

Tantele, E A (2005) Optimisation of preventative maintenance strategies for reinforced concrete bridges. PhD thesis, University of Surrey, UK.

Thaesler-Garibaldi, M P (2005) A methodology to develop an integrated engineering system to estimate quantities for bridge repairs at the pre-design stage. PhD thesis, Georgia Institute of Technology, USA.

Thiel, D J (2005) Builders: the social organisation of a construction site. PhD thesis, London School of Economics and Political Science, UK.

Thompson, N E (2005) Business excellence: lessons for the construction industry. PhD thesis, Loughborough University, UK.

Tsao, C C Y (2005) Use of work structuring to increase performance of project-based production systems. PhD thesis, University of California, Berkeley, USA.

Tuomela, A (2005) Network service organisation: interaction in workplace networks. PhD thesis, Helsinki University of Technology, Finland.

Van Tol, A A (2005) Agent embedded simulation modeling framework for construction engineering and management applications. PhD thesis, University of Alberta, Canada.

Verheij, J M (2005) Process-mediated planning of AEC projects through structured dialogues. PhD thesis, Georgia Institute of Technology, USA.

Vidalis, S M (2005) Relation between cost, quality, and risk in portland cement concrete pavement construction. PhD thesis, University of Florida, USA.

Wafai, M H M H (2005) Developing a methodology for technology transfer of advanced IT solutions in the construction sector. PhD thesis, University of Salford, UK.

Walewski, J A (2005) International project risk assessment. PhD thesis, University of Texas at Austin, USA.

Wang, L-H (2005) Vertical process integration in design and manufacturing of hardwood products. PhD thesis, University of Missouri - Columbia, USA.

Wang, S-Y (2005) Computer experiment for improving construction processes. PhD thesis, Purdue University, USA.

Wellings, F (2005) The rise of the national housebuilder: A history of British housebuilders through the twentieth century. PhD thesis, University of Liverpool, UK.

Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.

Woo, J-H (2005) Sharing tacit design knowledge in a distributed design environment. PhD thesis, Texas A&M University, USA.

Wright, J A (2005) An assessment of competitive advantage and market opportunities of UK construction companies operating in Europe. PhD thesis, University of Leeds, UK.

Wu, M (2005) Modelling just-in-time purchasing in the ready mixed concrete industry. PhD thesis, National University of Singapore, Singapore.

Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.

Yasin, M F (2005) A taxonomy and analysis of the relationship between changes in material technology and construction productivity. PhD thesis, University of Kentucky, USA.

Yeomans, S G (2005) ICT-enabled collaborative working methodologies in construction. EngD thesis, Loughborough University, UK.

Zaghloul, R S (2005) Risk allocation in contracts: How to improve the process. PhD thesis, University of Calgary, Canada.

Zhang, Guomin (2005) Factors influencing the implementation of raised floor system for the fitout of office buildings in the Australian context. PhD thesis, Queensland University of Technology, Australia.

Conference Paper

Abuharris, A and Ruddock, L (2005) Land-use planning and sustainable tourism development in Libya. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Afetornu, C and Edum-Fotwe, F T (2005) Characterising project contingency budget in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ahadzie, D K; Proverbs, D G and Olomolaiye, P (2005) Project managers' performance measures: A fresh perspective. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Al-Balushi, R A; Fortune, C and Kaka, A (2005) The implementation of corporate strategies through the use of an enterprise project management model (epmm): The case of telecommunication operator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Al-Sharif, F and Kaka, A (2005) Private finance intiative project's financial modelling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Al-Sinaidi, A R (2005) Selecting the unit price bid: An analytical method. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Al-Yami, A M and Price, A D F (2005) Exploring conceptual linkages between value engineering and sustainable construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Alkizim, A O and Green, S (2005) Robustness in value engineering. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Alkriz, K and Mangin, J C (2005) A new model for optimizing the location of cranes and construction facilities using genetic algorithms. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ancell, D (2005) Reducing costs: A practical application of performance-based specification and transaction cost theories. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Angelides, D and Xenidis, Y (2005) A methodology for the development of a european approach concerning performance and risks of built systems. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Anisuddin, S and Khaleeq, S (2005) Deterioration and rehabilitation of concrete structures in hot and arid regions. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ankrah, N A and Proverbs, D (2005) A framework for measuring construction project performance: Overcoming key challenges of performance measurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Aranda-Mena, G; Blismas, N and Wakefield, R (2005) Factors affecting the uptake of e-business by small building enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Asad, S; Fuller, P; Pan, W and Dainty, A R J (2005) Learning to innovate in construction: A case study. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Baccarini, D and Kraus, F (2005) Influences on risk taking behaviour of property developers in perth, western Australia. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Bellamy, T; Williams, A; Sher, W; Sherratt, S and Gameson, R (2005) Design communication: Issues confronting both co-located and virtual teams. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Bhutto, K; Thorpe, T and Stephenson, P (2005) E-commerce and the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Biggs, H C; Dingsdag, D P; Sheahan, V L and Stenson, N J (2005) The role of collaboration in defining and maintaining a safety culture: Australian perspectives in the construction sector. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Birgonul, M T; Dikmen, I and Demirel, T (2005) Decision support tool for the quantification of fault rates in construction fall accidents. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Boyd, D; Xiao, H and Chinyio, E (2005) Can knowledge-event approach work in construction SMEs? In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Bula-Diaz, C; Dainty, A and Burns, N (2005) The employment relationship of site and office-based managers in SME construction firms. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Burcar, I and Radujkovic, M (2005) Risk registers in construction in Croatia. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Castell, L (2005) Empowering the client in the briefing process. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chan, P W; Abbott, C; Cooper, R and Aouad, G (2005) Building future scenarios: A reflection for the research agenda. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chan, P W and Cooper, R (2005) Passion for learning: Consider the project mission. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chang, C Y (2005) Recent development of uk construction products sector: Evidence from microdata. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chau, K W and Wang, Y S (2005) An analyseis of productivity growth in the construction industry: A non-parametric approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chen, Y and Kamara, J M (2005) The use of mobile computing in construction information management. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Cheng, J; Proverbs, D G; Oduoza, C and Fleming, C (2005) A conceptual model towards the measurement of construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chileshe, N (2005) PhD in construction management research: What is original contribution to knowledge? The case of TQM. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chileshe, N; Watson, P; Maslow, D and Belokorovin, E (2005) The deployment of total quality management (TQM): The Russian experience. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chow, L K and Ng, S T (2005) Establishing a quantitaive performance evaluation framework through fuzzy membership functions. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Christodoulou, S (2005) Construction scheduling with artificial agents and the ant colony optimization metaheuristic. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ciribizni, A and Galimberti, G (2005) H&S planning and 4D project scheduling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Davey, L M J and London, K (2005) An ethnographic study of knowledge management practices within an Australian market leader: An organizational culture perspective. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2005) A conceptual demand led model founded on theories of labour market mismatch for the construction and building services industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ellabbar, K and Havard, T (2005) The accounting disclosure in developing countries: A comparative study of Libyan & Egyptian construction companies. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Enoma, A (2005) The role of facilities management at the design stage. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Erdogan, B; Anumba, C; Bouchlaghem, D and Nielsen, Y (2005) Change management in construction: The current context. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Faisol, N; Dainty, A R J and Price, A D F (2005) The concept of 'relational contracting' as a tool for understanding inter- organizational relationships in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Farrell, P and Middlemass, R (2005) Barriers to disabled students in built environment degree programmes. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Fewings, P and Hodgson, P (2005) Collaboration and learning: A business integration model. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Filho, A N d M; Filho, F M M; Miranda, A N d and Miranda, M I A d (2005) Improving the root pile execution process through setup time reduction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Gorse, C A; Ellis, R and Hudson-Tyreman, A (2005) Prospective delay analysis and adjudication. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Gorse, C A and Emmitt, S (2005) Group interaction research methods. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Goyal, S; Pitt, M and Sapri, M (2005) Innovation as a facilities management tool. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, B and Thomas, K (2005) An investigation into the development of knowledge management systems within the leading Irish construction companies. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, D; Smith, S D and Tommelein, I D (2005) Cost of concrete placement for contractors. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, S (2005) Sustainable building design: A systematic approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Gruneberg, S (2005) The performance of major firms in the heating and ventilating industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Hassan, P F; Griffith, A and Stephenson, P (2005) An empirical study of the training needs of site managers within the uk construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Hassouna, R (2005) Viability of applying the public private partnership (PPP) strategy to the libyan construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Hatush, Z; Saleh, S and Shiki, A (2005) Effect of critical delay factors on cost: Overrun during the design stage. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Håkansson, H and Jahre, M (2005) Economic logics in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Jha, K N (2005) Attributes of a project coordinator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kanagasabapathi, B and Ananthanarayanan, K (2005) A simulation model for resource constrained scheduling of multiple projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kang, J; Cheah, C Y J and Chew, D A S (2005) Strategic analysis of large chinese construction enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kappia, J G; Dainty, A R J and Price, A D F (2005) An assessment of construction craft trainee career priorities through the analytical hierarchy process. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kasim, N B; Anumba, C J and Dainty, A R J (2005) Improving materials management practices on fast-track construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Katavic, M; Matic, S and Ceric, A (2005) The engineer's education in business and construction management. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kaya, S; Hinks, J and Alexander, K (2005) Innovation in facilities supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Khalfan, M M A; McDermott, P and Maqsood, T (2005) Achieving supply chain integration through demand and supply management. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kheni, N A; Dainty, A R J and Gibb, A G F (2005) Health and safety management practices of small subcontractors. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kishk, M (2005) On the mathematical modelling of whole-life costs. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Koseoglu, O O and Nielsen, Y (2005) Mobile computing in construction projects; assessing feasibility. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kridan, A B and Goulding, J S (2005) Change management and human resource management as potential success areas for knowledge management implementation within the Libyan banking sector. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Krima, N; Aouad, G; Hatush, Z and Baldry, D (2005) An assessment model: The efficiency of consultants when dealing with delays in construction projects in Libya. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kwawu, W and Hughes, W P (2005) The impact of relational contracting on the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lee, C C T and Egbu, C (2005) Capturing client needs in refurbishment projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Leung, A Y T; Xu, J and Ge, J X (2005) Analysis of dynamical impacts of interest rate on expected housing price. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Leung, B Y P and Hui, E C M (2005) Pricing of pre-sale properties with construction uncertainties. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Lichtenberg, J (2005) Slimbouwen®: A strategy for innovation. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Liyanage, C; Egbu, C and Tookey, J (2005) Investigating the current state of infection control practices in domestics services in the national health service in Scotland: A case study approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ly, E; Anumba, C J and Carrillo, P M (2005) Knowledge management practices of construction project managers. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Löfgren, A (2005) Socio-technical management of collaborative mobile computing in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Mahdiputra, S; Giddings, B; Hogg, K and Daws, M (2005) Investigating learning in construction organizations. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Maqsood, T; Walker, D H T and Finegan, A D (2005) The role of knowledge management in enhancing knowledge pull in the construction organisation to deliver innovation: A case study. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Matipa, W M and Siamuzwe, V M M (2005) Information and communication technology (ICT) supported supply chain management: Benefits for construction business in landlocked developing nations. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Modeen, T; Pasquire, C and Soar, R (2005) Ubiquitous customization: Utilizing rapid manufacturing in the production of design and architecture. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Mootanah, D (2005) Researching whole life value methodologies for construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Mustaffa, N E and Bowles, G (2005) Investigating the "hard" and "soft" issues of problem resolution in partnering: Defining the research boundaries. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Myrtveit, I and Stensrud, E (2005) Identifying high performance construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Nanayakkara, L (2005) An empirically grounded framework for human resource management in the Sri Lankan construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ng, A K W and Price, A D F (2005) Assessing the impact of main contractor's site co-ordination on sub-contractors' performance in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ochieng, E and Price, A D F (2005) Integration and cultural engineering on projects in developing countries (Kenya). In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Odeyinka, H A; Davison, C and Olomolaiye, A (2005) An assessment of factors inhibiting designers from complying with health and safety regulations in their design. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Oloke, D; Manase, D and Olomolaiye, P (2005) Construction health and safety (H&S) performance: A conceptual framework for enhancing information and communication technology (ICT) impacts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Olomolaiye, A and Egbu, C (2005) The impact of human resource policies and practices on knowledge management in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Panas, A; Pantouvakis, J P and Edum-Fotwe, F T (2005) Potential for using process approach to manage construction projects in Greece. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Powell, A; Dainty, A R J; Bagilhole, B M and Neale, R H (2005) Coping in construction: Female students' perspectives. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Render, N; Greenwood, D and Edge, J (2005) The other g.M.P: Good manufacturing practice and its importance in the validation of constructed pharmaceutical facilities. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Rutter, D and Gidado, K (2005) PFI projects: Their scope for delivering vfm. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Salama, M; Kaka, A and Leishman, C (2005) The relationship between the performance of the economy and the cost of construction of educational buildings in Egypt: A preliminary study. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sapri, M and Pitt, M (2005) Performance measurement in facilities management; state of knowledge. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sardén, Y and Stehn, L (2005) Managing transformation, flow and value generation: A solid timber frame housing case. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sharp, M; Jones, K and Clarke, R (2005) An investigation into inefficiency in the condition based maintenance process. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Shearman, J; Hughes, W P; Gilchrist, R and Elwazani, S (2005) Strategies for reducing construction problems on archaeological sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sheibani, G and Havard, T (2005) The government role in housing in libya during the period 1970: 2000. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Shih, R C S; Gayley, A and Doro-on, A M (2005) Risk analysis of terrorism on U.S. Cargo transportation infrastructure. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Smallwood, J (2005) The role of optimum health and safety (H&S) in construction marketing. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Soltani, A R (2005) An intelligent transportation system in construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Suchocki, M (2005) Knowledge identification within the information infrastructure of a large multidisciplinary consultant. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Tang, C M and Leung, A Y T (2005) An impartial decision model for financial risk and decision analysis in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2005) A GA-based borrowing strategy for construction smes in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Tennant, S and Langford, D (2005) Construction management teams & project performance: A diagnostic toolkit. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Toole, T M (2005) A project management causal loop diagram. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wall, J and Ahmed, V (2005) Issues in developing a blended learning initiative to meet continuing professional development needs of construction professionals in Ireland. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wamuziri, S and Abu-Shaaban, N (2005) Potential of reverse auctions in construction procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wandahl, S (2005) Power, interest and value in building project organisations. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ward, P (2005) The socl's delay and disruption protocol and the Australian construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Waters, J; Neale, R; Hutson, S and Mears, K (2005) A perceptual assessment of personal safety in relation to university campus facilities. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

White, A S (2005) Public sector tendering: Issues and analysis. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wolbers, M; Evans, R J E; Holmes, M; Pasquire, C L and Price, A D F (2005) Construction management and lean thinking in highways maintenance. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Wong, P S P and Cheung, S O (2005) From monitoring to learning: A conceptual framework. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Xenidis, Y and Angelides, D (2005) Identification and classification of risks in a new modelling process for build-operate-transfer projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Yeung, D K L and Skitmore, M (2005) Data pooling for early-stage price forecasts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Yitmen, I and Alibaba, H Z (2005) An investigation of self-sustaining finance systems for property development in North Cyprus. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Yu, H; Oloke, D; Proverbs, D and Buckley, K (2005) Improving health and safty in construction: A knowledge-based approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Yuan, Z and Khosrowshahi, F (2005) Information system for project managers in chinese construction small and medium sized enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Zaneldin, E (2005) Construction claims in the united arab emirates: Types, causes, and frequency. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Zeng, J; An, M and Chan, A H C (2005) A fuzzy reasoning decision making approach based multi-expert judgement for construction project risk analysis. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Šelih, J (2005) Improvement of construction and demolition (C&D) waste management on construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

This list was generated on Sat Aug 22 01:02:41 2026 UTC.