Items where Year is 1997

Group by: Author(s) | Item Type | No Grouping
Number of items: 370.

Article

Abdel-Razek, R H (1997) How construction managers would like their performance to be evaluated. Journal of Construction Engineering and Management, 123(3), pp. 208-213. ISSN 0733-9364

Abejide, O S (1997) Solid soilcrete blocks for low-cost buildings: A Nigerian case study. Building Research & Information, 25(2), pp. 115-119. ISSN 0961-3218

AbouRizk, S M and Wales, R J (1997) Combined discrete-event/continuous simulation for project planning. Journal of Construction Engineering and Management, 123(1), pp. 11-20. ISSN 0733-9364

Adams, O (1997) Contractor development in Nigeria: Perceptions of contractors and professionals. Construction Management and Economics, 15(1), pp. 95-108. ISSN 01446193

Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364

Ahmad, I U and Sein, M K (1997) Construction project teams for TQM: A factor-element impact model. Construction Management and Economics, 15(5), pp. 457-467. ISSN 01446193

Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988

Alkoc, E and Erbatur, F (1997) Productivity improvement in concreting operations through simulation models. Building Research & Information, 25(2), pp. 82-91. ISSN 0961-3218

Anumba, C J and Evbuomwan, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), pp. 271-281. ISSN 01446193

Arditi, D; Kale, S and Tangkar, M (1997) Innovation in construction equipment and its flow into the construction industry. Journal of Construction Engineering and Management, 123(4), pp. 371-378. ISSN 0733-9364

Arditi, D; Khisty, C J and Yasamis, F (1997) Incentive/disincentive provisions in highway contracts. Journal of Construction Engineering and Management, 123(3), pp. 302-307. ISSN 0733-9364

Bajaj, D; Oluwoye, J and Lenard, D (1997) An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management and Economics, 15(4), pp. 363-369. ISSN 01446193

Bakens, W (1997) International trends in building and construction research. Journal of Construction Engineering and Management, 123(2), pp. 102-112. ISSN 0733-9364

Barkham, R (1997) The financial structure and ethos of property companies: An empirical analysis. Construction Management and Economics, 15(5), pp. 441-456. ISSN 01446193

Bernold, L E; Lorenc, S J and Luces, E (1997) Intelligent technology for truck crane accident prevention. Journal of Construction Engineering and Management, 123(3), pp. 276-284. ISSN 0733-9364

Bick, P (1997) Statutory reform of aspects of construction law in Australia. Construction Management and Economics, 15(6), pp. 549-558. ISSN 01446193

Blackwood, D J; Sarkar, S and Price, A D F (1997) A research methodology for modelling construction design service costs. Journal of Construction Procurement, 3(3), pp. 47-67. ISSN 1358-9180

Bon, R (1997) The future of international construction: Some survey results 1993-96. Building Research & Information, 25(3), pp. 137-141. ISSN 0961-3218

Bordass, W and Leaman, A (1997) Design for manageability. Building Research & Information, 25(3), pp. 148-157. ISSN 0961-3218

Bordass, W and Leaman, A (1997) Future buildings and their services: Strategic considerations for designers and clients. Building Research & Information, 25(4), pp. 190-195. ISSN 0961-3218

Boutfskis, V and Fellows, R F (1997) Appraising the performance of long span sportshalls and swimming pools in Greece. Journal of Financial Management of Property and Construction, 2(2), pp. 39-58. ISSN 1366-4387

Bowles, G; Dagpunar, J S and Gow, H (1997) Financial management of planned maintenance for housing associations. Construction Management and Economics, 15(4), pp. 315-326. ISSN 01446193

Brandon, P S and Loforte Ribeiro, F (1997) The assessment of applications for the house renovation grant system (hrgs): A multistrategy knowledge-based framework. Engineering, Construction and Architectural Management, 4(1), pp. 41-57. ISSN 0969-9988

Brooker, P and Lavers, A (1997) Perceptions of alternative dispute resolution as constraints upon its use in the UK construction industry. Construction Management and Economics, 15(6), pp. 519-526. ISSN 01446193

Bubshait, A A and Tahir, B (1997) Effect of silica fume on the concrete-steel bond. Building Research & Information, 25(6), pp. 365-369. ISSN 0961-3218

Carr, R I (1997) Engineering and construction management: Leadership and opportunity. Journal of Construction Engineering and Management, 123(3), pp. 292-296. ISSN 0733-9364

Chan, E H W (1997) Amicable dispute resolution in the people's republic of China and its implications for foreign-related construction disputes. Construction Management and Economics, 15(6), pp. 539-548. ISSN 01446193

Cheetham, D W; Kaka, A P and Humphreys, G (1997) Development and implementation of a system of financial planning and control for a medium sized building contractor. Journal of Financial Management of Property and Construction, 2(1), pp. 5-34. ISSN 1366-4387

Chen, J J (1997) China's construction industry and foreign investment. Building Research & Information, 25(1), pp. 5-10. ISSN 0961-3218

Chen, J J (1997) The impact of Chinese economic reforms upon the construction industry. Building Research & Information, 25(4), pp. 239-245. ISSN 0961-3218

Chen, J J and Wills, D (1997) Development of urban housing policies in China. Construction Management and Economics, 15(3), pp. 283-290. ISSN 01446193

Cheung, S-O (1997) Risk allocation: an essential tool for construction project management. Journal of Construction Procurement, 3(1), pp. 16-27. ISSN 1358-9180

Chua, D K H; Kog, Y C; Loh, P K and Jaselskis, E J (1997) Model for construction budget performance: neural network approach. Journal of Construction Engineering and Management, 123(3), pp. 214-222. ISSN 0733-9364

Cooper, I (1997) The UK's changing research base for construction. Building Research & Information, 25(5), pp. 268-300. ISSN 0961-3218

Cox, A and Townsend, M (1997) Latham as half-way house: A relational competence approach to better practice in construction procurement. Engineering, Construction and Architectural Management, 4(2), pp. 143-158. ISSN 0969-9988

Crook, D (1997) Empirical enquiry or metaphysics? Re-specifying the methodological debate. Journal of Construction Procurement, 3(2), pp. 56-71. ISSN 1358-9180

Crowley, L G (1997) Robust statistical estimators for use within competitive bid data. Journal of Construction Engineering and Management, 123(1), pp. 53-63. ISSN 0733-9364

Crowley, L G; Lutz, J D and Burleson, R C (1997) Functional illiteracy in construction industry. Journal of Construction Engineering and Management, 123(2), pp. 162-170. ISSN 0733-9364

Dalgliesh, C D; Bowen, P A and Hill, R C (1997) Environmental sustainability in the delivery of affordable housing in South Africa. Engineering, Construction and Architectural Management, 4(1), pp. 23-39. ISSN 0969-9988

Daoud, O E K (1997) The architect/engineer's role in rehabilitation work. Journal of Construction Engineering and Management, 123(1), pp. 1-5. ISSN 0733-9364

Davenport, D M (1997) Client satisfaction with construction cost: A comparative study of French and UK performance. Journal of Financial Management of Property and Construction, 2(3), pp. 77-94. ISSN 1366-4387

Davidson, C H (1997) The building centres: CIB's information allies: A strategy for improving information flow: upstream and downstream. Building Research & Information, 25(5), pp. 313-317. ISSN 0961-3218

Deakin, M (1997) The development of computer-based information systems for local authority property management 2: The application. Journal of Financial Management of Property and Construction, 2(2), pp. 59-84. ISSN 1366-4387

Deakin, M (1997) The development of computer-based information systems for local authority property management: The underlying issues. Journal of Financial Management of Property and Construction, 2(1), pp. 59-82. ISSN 1366-4387

Deddis, W G; McCluskey, W J; Mamis, A and McBumey, R D (1997) The potential for market research, property market analysis, & property valuation using (GIS) geographic information system technology. Journal of Financial Management of Property and Construction, 2(3), pp. 45-62. ISSN 1366-4387

Dorée, A G (1997) Construction procurement by Dutch municipalities. Journal of Construction Procurement, 3(3), pp. 78-88. ISSN 1358-9180

Drew, D and Skitmore, M (1997) The effect of contract type and size on competitiveness in bidding. Construction Management and Economics, 15(5), pp. 469-489. ISSN 01446193

Dzeng, R J and Tommelein, I D (1997) Boiler erection scheduling using product models and case-based reasoning. Journal of Construction Engineering and Management, 123(3), pp. 338-347. ISSN 0733-9364

El-Bibany, H (1997) Parametric constraint management in planning and scheduling: Computational basis. Journal of Construction Engineering and Management, 123(3), pp. 348-353. ISSN 0733-9364

Elazouni, A M (1997) Constructability improvement of steel silos during field operations. Journal of Construction Engineering and Management, 123(1), pp. 21-25. ISSN 0733-9364

Eldin, N N (1997) Concurrent engineering: A schedule reduction tool. Journal of Construction Engineering and Management, 123(3), pp. 354-362. ISSN 0733-9364

Enshassi, A (1997) Construction projects and the environment in Palestine. Building Research & Information, 25(2), pp. 111-114. ISSN 0961-3218

Enshassi, A (1997) Construction safety issues in Gaza Strip. Building Research & Information, 25(6), pp. 370-373. ISSN 0961-3218

Everett, J G and Farghal, S H (1997) Data representation for predicting performance with learning curves. Journal of Construction Engineering and Management, 123(1), pp. 46-52. ISSN 0733-9364

Everett, J G and Yang, I T (1997) Workers' comp. Premiums: Disparities in penalties for identical losses. Journal of Construction Engineering and Management, 123(3), pp. 312-317. ISSN 0733-9364

Ezulike, E I; Perry, J G and Hawwash, K (1997) The barriers to entry into the PFI market. Engineering, Construction and Architectural Management, 4(3), pp. 179-193. ISSN 0969-9988

Fan, Y and Kokko, E (1997) Three-dimensional gaseous transfer within cellular plastic insulation and its consequences. Building Research & Information, 25(1), pp. 25-35. ISSN 0961-3218

Farghal, S H and Everett, J G (1997) Learning curves: Accuracy in predicting future performance. Journal of Construction Engineering and Management, 123(1), pp. 41-45. ISSN 0733-9364

Farrell, M L (1997) Illiquidity, uncertainty and the impact of the term structure of interest rates on the valuation of real estate in a context of Knight-Keynes uncertainty. Journal of Financial Management of Property and Construction, 2(3), pp. 5-30. ISSN 1366-4387

Faruqi, S and Smith, N J (1997) Karachi light rail transit: A private finance proposal. Engineering, Construction and Architectural Management, 4(3), pp. 233-246. ISSN 0969-9988

Fenn, P; Lowe, D and Speck, C (1997) Conflict and dispute in construction. Construction Management and Economics, 15(6), pp. 513-518. ISSN 01446193

Fischer, M A and Tatum, C B (1997) Characteristics of design-relevant constructability knowledge. Journal of Construction Engineering and Management, 123(3), pp. 253-260. ISSN 0733-9364

Friedman, A and Cammalleri, V (1997) Selection criteria for energy-efficient windows. Building Research & Information, 25(4), pp. 234-238. ISSN 0961-3218

Galbraith, G H; McLean, R C and Kelly, D (1997) Moisture permeability measurements under varying barometric pressure. Building Research & Information, 25(6), pp. 348-353. ISSN 0961-3218

Gann, D (1997) Should governments fund construction research? Building Research & Information, 25(5), pp. 257-267. ISSN 0961-3218

Gavieta, R C (1997) Socio-economic and spatial indicators for household energy for a tropical urban community in urban Manila. Building Research & Information, 25(2), pp. 124-128. ISSN 0961-3218

Gavieta, R C and Onate, C E (1997) Building regulations and disaster mitigation: The Philippines. Building Research & Information, 25(2), pp. 120-123. ISSN 0961-3218

Goodhew, S; Bird, P and Paterson, I (1997) The financial implications of using natural ventilation to reduce the levels of radon gas within an existing 'period' dwelling. Journal of Financial Management of Property and Construction, 2(2), pp. 85-104. ISSN 1366-4387

Gooding, D and Thomas, T (1997) Soilcrete blocks. Building Research & Information, 25(4), pp. 202-209. ISSN 0961-3218

Griffith, A and Headley, J D (1997) Using a weighted score model as an aid to selecting procurement methods for small building works. Construction Management and Economics, 15(4), pp. 341-348. ISSN 01446193

Griffith, A and Sidwell, A C (1997) Development of constructability concepts, principles and practices. Engineering, Construction and Architectural Management, 4(4), pp. 295-310. ISSN 0969-9988

Grimsey, D and Graham, R (1997) PFI in the NHS (Private finance initiative in the UK national health service). Engineering, Construction and Architectural Management, 4(3), pp. 215-231. ISSN 0969-9988

Gunning, J G (1997) The costs and benefits of achieving business excellence in construction organisations. Journal of Financial Management of Property and Construction, 2(1), pp. 45-58. ISSN 1366-4387

Hagan, E B (1997) The use of stabilized soil to enhance rural housing. Building Research & Information, 25(4), pp. 210-217. ISSN 0961-3218

Hampson, K and Fischer, M (1997) Structural designs and construction technologies for California highway bridges. Journal of Construction Engineering and Management, 123(3), pp. 269-275. ISSN 0733-9364

Hampson, K and Kwok, T (1997) Strategic alliances in building construction: a tender evaluation tool for the public sector. Journal of Construction Procurement, 3(1), pp. 28-41. ISSN 1358-9180

Hampson, K and Tatum, C B (1997) Technology strategy and competitive performance in bridge construction. Journal of Construction Engineering and Management, 123(2), pp. 153-161. ISSN 0733-9364

Hancher, D E; De La Garza, J M and Eckert, G K (1997) Improving workers' compensation management in construction. Journal of Construction Engineering and Management, 123(3), pp. 285-291. ISSN 0733-9364

Harris, D J and Dudek, S J M (1997) Heat losses from suspended timber floors. Building Research & Information, 25(4), pp. 226-233. ISSN 0961-3218

Hartman, F; Snelgrove, P and Ashrafi, R (1997) Effective wording to improve risk allocation in lump sum contracts. Journal of Construction Engineering and Management, 123(4), pp. 379-387. ISSN 0733-9364

Hassanein, A and Melin, J (1997) Crew design methodology for construction contractors. Journal of Construction Engineering and Management, 123(3), pp. 203-207. ISSN 0733-9364

Hatush, Z and Skitmore, M (1997) Assessment and evaluation of contractor data against client goals using PERT approach. Construction Management and Economics, 15(4), pp. 327-340. ISSN 01446193

Hatush, Z and Skitmore, M (1997) Criteria for contractor selection. Construction Management and Economics, 15(1), pp. 19-38. ISSN 01446193

Hawwash, K and Barnes, M (1997) The potential for adopting the NEC's family of contracts on PFI projects. Engineering, Construction and Architectural Management, 4(3), pp. 203-214. ISSN 0969-9988

Hill, R C and Bowen, P A (1997) Sustainable construction: Principles and a framework for attainment. Construction Management and Economics, 15(3), pp. 223-239. ISSN 01446193

Hindle, R D and Muller, M H (1997) The role of education as an agent of change: a two-fold effect. Journal of Construction Procurement, 3(1), pp. 56-69. ISSN 1358-9180

Holt, G D (1997) Classifying construction contractors: A case study using cluster analysis. Building Research & Information, 25(6), pp. 374-382. ISSN 0961-3218

Holt, G D (1997) Construction research questionnaires and attitude measurement: Relative index or mean? Journal of Construction Procurement, 3(2), pp. 88-96. ISSN 1358-9180

Huang, X and Bernold, L E (1997) CAD-integrated excavation and pipe laying. Journal of Construction Engineering and Management, 123(3), pp. 318-323. ISSN 0733-9364

Hughes, W P (1997) Construction management contracts: Law and practice. Engineering, Construction and Architectural Management, 4(1), pp. 59-79. ISSN 0969-9988

Hui, C M; Chiang, Y H and Tang, B S (1997) Asian real estate markets: Boom and oversupply? Journal of Financial Management of Property and Construction, 2(3), pp. 63-76. ISSN 1366-4387

Ibbs, C W (1997) Quantitative impacts of project change: Size issues. Journal of Construction Engineering and Management, 123(3), pp. 308-311. ISSN 0733-9364

Jaafari, A (1997) Concurrent construction and life cycle project management. Journal of Construction Engineering and Management, 123(4), pp. 427-436. ISSN 0733-9364

Jannadi, M O (1997) An effective safety programme for a concrete product manufacturing plant. Building Research & Information, 25(2), pp. 92-100. ISSN 0961-3218

Kaming, P F; Olomolaiye, P O; Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94. ISSN 01446193

Kang, L S and Paulson, B C (1997) Adaptability of information classification systems for civil works. Journal of Construction Engineering and Management, 123(4), pp. 419-426. ISSN 0733-9364

Kangari, R and Miyatake, Y (1997) Developing and managing innovative construction technologies in Japan. Journal of Construction Engineering and Management, 123(1), pp. 72-84. ISSN 0733-9364

Karshenas, S (1997) Strength variability of conventional slab formwork systems. Journal of Construction Engineering and Management, 123(3), pp. 324-330. ISSN 0733-9364

Kartam, N A (1997) Integrating safety and health performance into construction CPM. Journal of Construction Engineering and Management, 123(2), pp. 121-126. ISSN 0733-9364

Kartarn, S; Ballard, G and Ibbs, C W (1997) Introducing a new concept and approach to modeling construction. Journal of Construction Engineering and Management, 123(1), pp. 89-97. ISSN 0733-9364

Kennedy, P; Morrison, A and Milne, D O (1997) Resolution of disputes arising from set-off clauses between main contractors and subcontractors. Construction Management and Economics, 15(6), pp. 527-537. ISSN 01446193

Keswani, K (1997) The contribution of building centres to low-cost housing in India. Building Research & Information, 25(1), pp. 50-64. ISSN 0961-3218

Khosrowshahi, F (1997) The optimum project duration and cost curve for Hong Kong public housing projects. Engineering, Construction and Architectural Management, 4(4), pp. 249-269. ISSN 0969-9988

Kim, S (1997) Organization and managerial environment of the Korean construction industry. Construction Management and Economics, 15(5), pp. 409-419. ISSN 01446193

Kindangen, J I (1997) Window and roof configurations for comfort ventilation. Building Research & Information, 25(4), pp. 218-225. ISSN 0961-3218

Kumaraswamy, M M (1997) Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 4(2), pp. 95-111. ISSN 0969-9988

Leather, P and Rolfe, S J (1997) Fit for the task: The future of the small scale domestic repair and maintenance industry in the UK. Construction Management and Economics, 15(2), pp. 201-212. ISSN 01446193

Lenard, D; Raftery, J and McGeorge, D (1997) Designing a research methodology. Journal of Construction Procurement, 3(2), pp. 19-33. ISSN 1358-9180

Li, C Q (1997) Deterioration of concrete building structures. Building Research & Information, 25(4), pp. 196-201. ISSN 0961-3218

Li, H (1997) Determinants of knowledge-based expert system success in construction engineering. Building Research & Information, 25(2), pp. 101-106. ISSN 0961-3218

Li, H and Love, P (1997) Using improved genetic algorithms to facilitate time-cost optimization. Journal of Construction Engineering and Management, 123(3), pp. 233-237. ISSN 0733-9364

Li, H and Love, P E D (1997) Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17(2), pp. 169-176. ISSN 01446193

Lombardi, P (1997) Decision making in urban regeneration plans. Engineering, Construction and Architectural Management, 4(2), pp. 127-142. ISSN 0969-9988

Lowe, J G (1997) Insolvency in the UK construction industry. Journal of Financial Management of Property and Construction, 2(1), pp. 83-112. ISSN 1366-4387

Luiten, G T and Tolman, F P (1997) Automating communication in civil engineering. Journal of Construction Engineering and Management, 123(2), pp. 113-120. ISSN 0733-9364

Löffler, M (1997) Foamglass as spacer in multiple-glazing. Building Research & Information, 25(2), pp. 107-110. ISSN 0961-3218

Mansfield, J R (1997) Authorised property unit trusts: Opportunities and threats. Journal of Financial Management of Property and Construction, 2(1), pp. 35-44. ISSN 1366-4387

McCabe, S (1997) Using suitable tools for researching what quality managers in construction organizations actually do. Journal of Construction Procurement, 3(2), pp. 72-87. ISSN 1358-9180

Modak, J P; Sohoni, V V and Aware, H V (1997) Manually powered manufacture of keyed bricks. Building Research & Information, 25(6), pp. 354-364. ISSN 0961-3218

Mok, C K; Rao Tummala, V M and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(2), pp. 161-175. ISSN 01446193

Mondorf, P E; Kuprenas, J A and Kordahi, E N (1997) Segmental cantilever bridge construction case study. Journal of Construction Engineering and Management, 123(1), pp. 79-84. ISSN 0733-9364

Nam, C H and Tatum, C B (1997) Leaders and champions for construction innovation. Construction Management and Economics, 15(3), pp. 259-270. ISSN 01446193

Naresh, A L and Jahren, C T (1997) Communications and tracking for construction vehicles. Journal of Construction Engineering and Management, 123(3), pp. 261-268. ISSN 0733-9364

Navon, R; Arkin, H and Burg, I (1997) Economic evaluation of HVAC systems with ice storage designed using an optimization technique. Construction Management and Economics, 15(5), pp. 429-439. ISSN 01446193

Ngowi, A B (1997) Impact of culture on construction procurement. Journal of Construction Procurement, 3(1), pp. 3-15. ISSN 1358-9180

Ngowi, A B (1997) A hybrid approach to house construction: a case study in Botswana. Building Research & Information, 25(3), pp. 142-147. ISSN 0961-3218

Noyce, D A and Hanna, A S (1997) Planned schedule compression concept file for electrical contractors. Journal of Construction Engineering and Management, 123(2), pp. 189-197. ISSN 0733-9364

Obeng, K; Ocran, K A G and Anaba, D (1997) Palm kernel shell as fuel for burning bricks. Building Research & Information, 25(3), pp. 131-136. ISSN 0961-3218

Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387

Owen, G and Merna, A (1997) The private finance initiative. Engineering, Construction and Architectural Management, 4(3), pp. 163-177. ISSN 0969-9988

Owers, R and Weber, S L (1997) Strategic plan for southwest Indian community's construction business. Journal of Construction Engineering and Management, 123(3), pp. 331-337. ISSN 0733-9364

Payne, H (1997) Key legal issues in projects procured under the private finance initiative. Engineering, Construction and Architectural Management, 4(3), pp. 195-202. ISSN 0969-9988

Peng, C L; Scorpio, D E and Kibert, C J (1997) Strategies for successful construction and demolition waste recycling operations. Construction Management and Economics, 15(1), pp. 49-58. ISSN 01446193

Peng, J L; Yen, T; Lin, Y; Wu, K L and Chen, W F (1997) Performance of scaffold frame shoring under pattern loads and load paths. Journal of Construction Engineering and Management, 123(2), pp. 138-145. ISSN 0733-9364

Pheng, L S and May, C F (1997) Quality management systems: A study of authority and empowerment. Building Research & Information, 25(3), pp. 158-169. ISSN 0961-3218

Pheng, L S and Omar, H F (1997) Integration, segmentalism and the maintenance of quality management systems in the construction industry. Building Research & Information, 25(1), pp. 36-49. ISSN 0961-3218

Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(2), pp. 67-81. ISSN 0961-3218

Pietroforte, R (1997) Communication and governance in the building process. Construction Management and Economics, 15(1), pp. 71-82. ISSN 01446193

Pocock, J B; Liu, L Y and Kim, M K (1997) Impact of management approach on project interaction and performance. Journal of Construction Engineering and Management, 123(4), pp. 411-418. ISSN 0733-9364

Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364

Preece, C and Male, S (1997) Promotional literature for competitive advantage in UK construction firms. Construction Management and Economics, 15(1), pp. 59-69. ISSN 01446193

Price, A D F and Shawa, H (1997) Survey of project related finance in United Arab Emirates. Journal of Construction Engineering and Management, 123(3), pp. 223-232. ISSN 0733-9364

Price, A D F and Shawa, H H (1997) Risk and risk management in project related finance. Journal of Construction Procurement, 3(3), pp. 27-46. ISSN 1358-9180

Proverbs, D G; Holt, G D and Olomolaiye, P O (1997) Factors influencing the choice of concrete supply methods. Building Research & Information, 25(3), pp. 176-184. ISSN 0961-3218

Puddicombe, M S (1997) Designers and contractors: Impediments to integration. Journal of Construction Engineering and Management, 123(3), pp. 245-252. ISSN 0733-9364

Punwani, A (1997) A study of the growth-investment-financing nexus of the major UK construction groups. Construction Management and Economics, 15(4), pp. 349-361. ISSN 01446193

Rawlinson, S and Raftery, J (1997) Price stability and the business cycle: UK construction bidding patterns 1970-91. Construction Management and Economics, 15(1), pp. 5-18. ISSN 01446193

Reszka, M and Edwards, P J (1997) Joint ventures: A construction project case study. Journal of Financial Management of Property and Construction, 2(2), pp. 5-20. ISSN 1366-4387

Riley, D R and Sanvido, V E (1997) Space planning method for multistory building construction. Journal of Construction Engineering and Management, 123(2), pp. 171-180. ISSN 0733-9364

Rooke, J; Seymour, D and Crook, D (1997) Preserving methodological consistency: A reply to raftery, mcgeorge and walters. Construction Management and Economics, 15(5), pp. 491-494. ISSN 01446193

Rooke, J D (1997) Developing a more empirical approach to culture, attitude and motivation in construction management research: a critique and a proposal. Journal of Construction Procurement, 3(2), pp. 45-55. ISSN 1358-9180

Root, D; Fellows, R F and Hancock, M (1997) Quantitative versus qualitative or positivism and interactionism: a reflection of ideology in the current methodological debate? Journal of Construction Procurement, 3(2), pp. 34-44. ISSN 1358-9180

Runeson, G (1997) Ignorantes Procedite: a critical evaluation of the movement for methodological renewal. Journal of Construction Procurement, 3(3), pp. 68-77. ISSN 1358-9180

Runeson, G (1997) The methodology of building economics research. Journal of Construction Procurement, 3(2), pp. 3-18. ISSN 1358-9180

Runeson, G (1997) The role of theory in construction management research: Comment. Construction Management and Economics, 15(3), pp. 299-302. ISSN 01446193

Russell, J S; Jaselskis, E J and Lawrence, S P (1997) Continuous assessment of project performance. Journal of Construction Engineering and Management, 123(1), pp. 64-71. ISSN 0733-9364

Schexnayder, C and Ohrn, L G (1997) Highway specifications: quality versus pay. Journal of Construction Engineering and Management, 123(4), pp. 437-443. ISSN 0733-9364

Scott, S (1997) Delay claims in UK contracts. Journal of Construction Engineering and Management, 123(3), pp. 238-244. ISSN 0733-9364

Seymour, D; Crook, D and Rooke, J (1997) The role of theory in construction management: A call for debate. Construction Management and Economics, 15(1), pp. 117-119. ISSN 01446193

Seymour, D; Shammas-Toma, M and Clark, L (1997) Limitations of the use of tolerances for communicating design requirements to site. Engineering, Construction and Architectural Management, 4(1), pp. 3-22. ISSN 0969-9988

Sha, K; Deng, X; Chen, Q and Xie, B (1997) Evolution of cost estimating system in China: Intelligent estimator for Shandong Province (IES) to general intelligent estimator (GIE). Building Research & Information, 25(1), pp. 11-14. ISSN 0961-3218

Shash, A A and Al-Amir, M (1997) Information technology in contractors' firms in Saudi Arabia. Construction Management and Economics, 15(2), pp. 187-200. ISSN 01446193

Shi, J and AbouRizk, S M (1997) Resource-based modeling for construction simulation. Journal of Construction Engineering and Management, 123(1), pp. 26-33. ISSN 0733-9364

Shih, N J and Lan, W J (1997) Incorporating a 3D urban environmental model (3DUEM) into government and architectural firms. Building Research & Information, 25(1), pp. 18-24. ISSN 0961-3218

Sillars, D N and Kangari, R (1997) Japanese construction alliances. Journal of Construction Engineering and Management, 123(2), pp. 146-152. ISSN 0733-9364

Simister, S J and Green, S D (1997) Recurring themes in value management practice. Engineering, Construction and Architectural Management, 4(2), pp. 113-125. ISSN 0969-9988

Songer, A D; Diekmann, J and Pecsok, R S (1997) Risk analysis for revenue dependent infrastructure projects. Construction Management and Economics, 15(4), pp. 377-382. ISSN 01446193

Songer, A D and Molenaar, K R (1997) Project characteristics for successful public-sector design-build. Journal of Construction Engineering and Management, 123(1), pp. 34-40. ISSN 0733-9364

Stipanowich, T J (1997) At the cutting edge: Conflict avoidance and resolution in the US construction industry. Construction Management and Economics, 15(6), pp. 505-512. ISSN 01446193

Tang, S L; Lee, H K and Wong, K (1997) Safety cost optimization of building projects in Hong Kong. Construction Management and Economics, 15(2), pp. 177-186. ISSN 01446193

Thomas, H R and Raynar, K A (1997) Scheduled overtime and labor productivity: Quantitative analysis. Journal of Construction Engineering and Management, 123(2), pp. 181-188. ISSN 0733-9364

Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(2), pp. 83-94. ISSN 0969-9988

Tiong, R L K and Alum, J (1997) Final negotiation in competitive BOT tender. Journal of Construction Engineering and Management, 123(1), pp. 6-10. ISSN 0733-9364

Touran, A (1997) Probabilistic model for tunneling project using Markov chain. Journal of Construction Engineering and Management, 123(4), pp. 444-449. ISSN 0733-9364

Touran, A; Sheahan, T C and Ozcan, E (1997) Rational equipment selection method based on soil conditions. Journal of Construction Engineering and Management, 123(1), pp. 85-88. ISSN 0733-9364

Touran, A and Suphot, L (1997) Rank correlations in simulating construction costs. Journal of Construction Engineering and Management, 123(3), pp. 297-301. ISSN 0733-9364

Tse, R Y C and Ganesan, S (1997) Causal relationship between construction flows and GDP: Evidence from Hong Kong. Construction Management and Economics, 15(4), pp. 371-376. ISSN 01446193

Venegas C, P and Alarcón C, L F (1997) Selecting long-term strategies for construction firms. Journal of Construction Engineering and Management, 123(4), pp. 388-398. ISSN 0733-9364

Wakefield, R R and Sears, G A (1997) Petri nets for simulation and modeling of construction systems. Journal of Construction Engineering and Management, 123(2), pp. 105-112. ISSN 0733-9364

Walker, D H T (1997) Choosing an appropriate research methodology. Construction Management and Economics, 15(2), pp. 149-159. ISSN 01446193

Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(1), pp. 42-55. ISSN 1358-9180

Wall, D M (1997) Distributions and correlations in Monte Carlo simulation. Construction Management and Economics, 15(3), pp. 241-258. ISSN 01446193

Walsh, K D; Houston, W N and Houston, S L (1997) Field implications of current compaction specification design practices. Journal of Construction Engineering and Management, 123(4), pp. 363-370. ISSN 0733-9364

Wei, H and Xu, X (1997) Composite masonry buildings in China. Building Research & Information, 25(1), pp. 15-17. ISSN 0961-3218

Wild, S; Gailius, A; Hansen, H; Pederson, L and Szwabowski, J (1997) Pozzolanic properties of a variety of European clay bricks. Building Research & Information, 25(3), pp. 170-175. ISSN 0961-3218

Wing, C K (1997) Monte Carlo simulation of construction costs using subjective data: Response. Construction Management and Economics, 15(1), pp. 109-115. ISSN 01446193

Wing, C K (1997) The ranking of construction management journals. Construction Management and Economics, 15(4), pp. 387-398. ISSN 01446193

Woodhead, R (1997) Exploring the hurdle rate in preparation for a value management workshop planning session. Journal of Financial Management of Property and Construction, 2(2), pp. 21-38. ISSN 1366-4387

Yates, J K and Aniftos, S (1997) International standards and construction. Journal of Construction Engineering and Management, 123(2), pp. 127-137. ISSN 0733-9364

Yogeswaran, K; Kumaraswamy, M M and Miller, D R A (1997) Perceived sources and causes of construction claims. Journal of Construction Procurement, 3(3), pp. 3-26. ISSN 1358-9180

Thesis

Abdul Majid, M Z (1997) Non-excusable delays in construction. PhD thesis, Loughborough University, UK.

Abdulhadi, N H (1997) Simulation as a tool for re-engineering construction processes. PhD thesis, University of Colorado at Boulder, USA.

Abeysekera, W V K M (1997) A strategy for managing brickwork in Sri Lanka. PhD thesis, Loughborough University, UK.

Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects. PhD thesis, University of Strathclyde, UK.

Akinsola, A O (1997) An intelligent model of variations' contingency on constructions projects. PhD thesis, University of Wolverhampton, UK.

Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization. PhD thesis, University of Colorado at Boulder, USA.

Al-Zarooni, S (1997) Developing the construction industry in the United Arab Emirates with special reference to Abu Dhabi. PhD thesis, University of London, University College London, UK.

Allen, B M (1997) Alabama tree ordinances, protection and preservation on construction sites. PhD thesis, Auburn University, USA.

Allen, S (1997) Information management for housing maintenance: a systemic view. PhD thesis, University of Salford, UK.

Arora, R (1997) Role and influence of emerging social dynamics in decisions on investment opportunities in construction industry. PhD thesis, Indian Institute of Technology Delhi, India.

Assadi, S O A (1997) An investigation of the records kept by supervisors on construction sites. PhD thesis, University of Newcastle upon Tyne, UK.

Baker, Scott William (1997) Risk management in major projects. PhD thesis, University of Edinburgh, UK.

Bakkeren, W J C (1997) Computer-integrated structural engineering: Supporting the structural engineer's participation in a computer-integrated construction process. PhD thesis, Delft University of Technology, Netherlands.

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.

Bishop, E A (1997) Talking shop: Egyptian engineers and Soviet specialists at the Aswan High Dam. PhD thesis, University of Chicago, USA.

Brizendine, A L (1997) Risk based analysis of levees. PhD thesis, West Virginia University, USA.

Brooker, P (1997) Factors which impact on the choice of alternative dispute resolution in the construction industry. PhD thesis, Oxford Brookes University, UK.

Burleson, R C (1997) An analysis of multiskilled labor strategies in construction. PhD thesis, University of Texas at Austin, USA.

Chan, M-W (1997) The relationship between project funding and construction systems. PhD thesis, University of Hong Kong, Hong Kong.

Chin, S (1997) An integrated life-cycle information framework for construction project management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Conroy, G (1997) CONSERV: A methodology for the management of capital projects and concurrent engineering design using knowledge based technology. PhD thesis, Cranfield University, UK.

Cook, E L (1997) Integration of total quality management with a project management approach for capital projects. PhD thesis, Texas A&M University, USA.

Coram, W R (1997) The privatisaton of the property services agency. PhD thesis, University of Manchester, UK.

Corbett, D I (1997) Quantifying quality in industrial construction. PhD thesis, Pennsylvania State University, USA.

Coutts, A W (1997) Change management in the construction industry: a client's mechanism for control. PhD thesis, Heriot-Watt University, UK.

Davies, R (1997) Intrinsic job satisfaction: An examination of United Kingdom construction trades operatives. PhD thesis, University of Manchester, UK.

Davis, W J (1997) An evaluation of life cycle factors for urban arterial roadways. PhD thesis, Georgia Institute of Technology, USA.

Dawson, P J (1997) A hierarchical approach to the management of construction project risk. PhD thesis, University of Nottingham, UK.

Du Toit, G J (1997) The potential of labour-intensive construction methods in the provision of urban infrastructure. PhD thesis, University of Pretoria, South Africa.

El-Assaly, A E E-D (1997) Development of a statistical/mechanistic model to predict the consumption of nonrenewable materials in highway construction programs. PhD thesis, University of Florida, USA.

El-Diraby, T E-S (1997) System for evaluating bridge construction plans. PhD thesis, University of Texas at Austin, USA.

El-khawas, I N (1997) The optimal design of buildings: A life-cycle approach to energy efficiency. PhD thesis, Ohio State University, USA.

Embi, M R (1997) An intelligent assistant for designing to fire regulations in Malaysia. PhD thesis, University of Sheffield, UK.

Emmitt, S (1997) The diffusion of innovations in the building industry. PhD thesis, University of Manchester, UK.

Foster, M E (1997) Energy conservation in the United Kingdom housing sector: An exploration of technical and social issues. PhD thesis, Open University, UK.

Gaafar, H K (1997) Risk allocations in standard forms of engineering and construction contract. PhD thesis, University of Birmingham, UK.

Goh, B H (1997) Construction demand modelling: a systematic approach to using economic indicators and a comparative study of alternative forecasting approaches. PhD thesis, University College London, UK.

Griffith, A F (1997) Team alignment during pre-project planning of capital facilities. PhD thesis, University of Texas at Austin, USA.

Gunner, J C (1997) A model of building price forecasting accuracy. PhD thesis, University of Salford, UK.

Harper, G S (1997) Local government contract management: Decreasing cost overages in contracted out services. DPA thesis, University of La Verne, USA.

Hassan, Z (1997) CONPLAN: Construction planning and buildability evaluation in an integrated and intelligent construction environment. PhD thesis, University of Salford, UK.

He, W (1997) Pavement project optimization and analysis. PhD thesis, Arizona State University, USA.

Herabat, P (1997) A functional specification for a decision support system to select bridge analysis tools. PhD thesis, Carnegie Mellon University, USA.

Hill, S (1997) The complex effects of obstructions on horizontal illuminance in interior lighting design. PhD thesis, University of Reading, UK.

Horstmann, R (1997) Behavioral and financial impact of customer satisfaction and service quality: An empirical assessment in the facilities management industry. DBA thesis, Nova Southeastern University, USA.

Horvath, A (1997) Estimation of environmental implications of construction materials and designs using life cycle assessment techniques. PhD thesis, Carnegie Mellon University, USA.

Hudson, D N (1997) Benchmarking construction project execution. PhD thesis, University of Texas at Austin, USA.

Iyer-Raniga, Usha (1997) Participative techniques for urban environmental improvement. PhD thesis, University of Melbourne, Australia.

Jenner, M S (1997) Designing high performance teams for projects: a study of 49 project teams in the UK construction industry. PhD thesis, Open University, UK.

Jennings, Iain C (1997) Systemic integration in construction project organisations. PhD thesis, University of Melbourne, Australia.

Jung, Y (1997) Information systems planning methodology for the construction industry. PhD thesis, University of Texas at Austin, USA.

Kadefors, A (1997) Beställar-entreprenörrelationer i byggandet: Samarbete, konflikt och social påverkan (Client-contractor relationships in building projects: Co-operation, conflict and social influence). PhD thesis, Chalmers University of Technology, Sweden.

Kader, A S A (1997) Cost modelling for inland waterway transport systems. PhD thesis, Liverpool John Moores University, UK.

Kiliccote, H (1997) A standards processing framework. PhD thesis, Carnegie Mellon University, USA.

Kim, K J (1997) Simplified discrete event simulation for heavy construction operations. PhD thesis, University of Texas at Austin, USA.

Kim, S (1997) Version management in computer-aided architectural design. DDes thesis, Harvard University, USA.

Konchar, M D (1997) A comparison of United States project delivery systems. PhD thesis, Pennsylvania State University, USA.

Koskisto, O (1997) Reliability-based optimization of plant precast concrete building systems. PhD thesis, Johns Hopkins University, USA.

Kulshrestha, M (1997) Total Value Control in Construction through Multiple Criteria Decision Making (MCDM). PhD thesis, Indian Institute of Technology Delhi, India.

Lam, Ka-Chi (1997) The optimisation of financial decisions in a contracting firm. PhD thesis, University of New South Wales, Australia.

Lee, J-R (1997) The object-oriented project system for pavement construction management and visualization. PhD thesis, Ohio State University, USA.

Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.

Lopes, J P (1997) Interdependence between the construction sector and the national economy in developing countries: a special focus on Angola and Mozambique. PhD thesis, University of Salford, UK.

Mashamba, M S (1997) The construction industry in Zambia: opportunities and constraints under the structural adjustment programme and the enabling shelter strategy. PhD thesis, University of Newcastle upon Tyne, UK.

Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.

McCabe, B Y (1997) An automated modeling approach for construction performance improvement using simulation and belief networks. PhD thesis, University of Alberta, Canada.

Meraghni, Leila (1997) An integrated information model for construction materials management. PhD thesis, Liverpool John Moores University, UK.

Miles, D W J (1997) The development of intermediate construction enterprises. PhD thesis, Loughborough University, UK.

Mohammadinia, M R (1997) Development of rational and defensible pay schedules for a performance specification using performance prediction and user and agency costs. PhD thesis, Polytechnic University, USA.

Molenaar, K R (1997) Public sector design-build: A model for project selection. PhD thesis, University of Colorado at Boulder, USA.

Naji, K K (1997) The development of a virtual environment for simulating equipment-based construction operations in real-time object-oriented systems. PhD thesis, University of Florida, USA.

Nesan, L J (1997) A generic model for effective implementation of empowerment in construction contractor organisations. PhD thesis, University of Wolverhampton, UK.

Nunes, M C M (1997) Enabling the use of alternative materials in road construction. PhD thesis, University of Nottingham, UK.

Pasley, G P (1997) Steelteam: Creating a collaborative design environment for the steel building industry. PhD thesis, University of Kansas, USA.

Patterson, D E (1997) Earthworks planning for linear construction projects. PhD thesis, University of Nottingham, UK.

Perry, M J (1997) Distributed cognition and computer supported collaborative design: The organisation of work in construction engineering. PhD thesis, Brunel University, UK.

Rahbar, F (1997) Computer-aided parametric planning (CAPP). PhD thesis, Iowa State University, USA.

Rahmat, I B (1997) The planning and control process of refurbishment projects. PhD thesis, University College London, UK.

Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ren, S (1997) GIS-based tools for earthquake risk assessment of point and spatially distributed lifeline systems. PhD thesis, State University of New York at Buffalo, USA.

Rivard, H (1997) A building design representation for conceptual design and case-based reasoning. PhD thesis, Carnegie Mellon University, USA.

Rojas Molina, E M (1997) Developing a web-centric process to support inspection. PhD thesis, University of Colorado at Boulder, USA.

Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.

Sacks, R (1997) Computer integrated construction: project data model representation and use. Unpublished PhD thesis, Technion Israel Institute of Technology, Israel.

Saleh, Iraj (1997) The shadow pricing of labour in cost benefit analysis of infrastructure projects: Theory and application to sydney's second airport project. PhD thesis, University of Western Sydney, Australia.

Schmidt, J R (1997) Quantifying the impact of construction accidents using predictive models. PhD thesis, State University of New York at Buffalo, USA.

Scott, D (1997) An intelligent approach to the engineering management of housing subsidence cases. PhD thesis, Teesside University, UK.

Seemann, Kurt Walter (1997) The socio-technical sustainability of shelter systems and hardware in remote indigenous Australian communities. PhD thesis, University of New South Wales, Australia.

Shook, S R (1997) Innovation and the United States residential construction industry: An integrated model of determinants of firm innovativeness for engineered wood products. PhD thesis, University of Washington, USA.

Siddiqi, K M (1997) Framework for analyzing construction alternatives with respect to environmental laws. PhD thesis, Georgia Institute of Technology, USA.

Slicher, A W R (1997) A strategic decision support system for a consulting engineering firm using a hybrid neural network-expert system approach. PhD thesis, University of Leeds, UK.

Sohail, M (1997) An investigation into the procurement of urban infrastructure in developing countries. PhD thesis, Loughborough University, UK.

Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model. PhD thesis, Purdue University, USA.

Souza, Roberto de (1997) Methodology for development and implementation of quality management systems in small and medium size building companies. PhD thesis, Universidade de São Paulo, Brazil.

Staneff, S T (1997) A decision support system for infrastructure management. PhD thesis, University of California, Berkeley, USA.

Sulaiman, M J (1997) Intesite: Intelligent site layout planning within an object-oriented integrated construction environment. PhD thesis, University of Salford, UK.

Tapper, H (1997) Welfare assessment of public investment in a CGE model. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Teo, Ai Lin Evelyn (1997) Strategic market positioning in the construction industry: Models for evaluating mobility and diversification. PhD thesis, University of New South Wales, Australia.

Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.

Thompson, E T (1997) A rational approach to computer integration in construction. PhD thesis, London South Bank University, UK.

Tombesi, P (1997) Travels from flatland: The Walt Disney concert hall and the specialization of design knowledge in the building sector. PhD thesis, University of California, Los Angeles, USA.

Torbica, Z M (1997) Total quality management and customer satisfaction in homebuilding. PhD thesis, University of Florida, USA.

Vidogah, W (1997) Claims on construction contracts: a new management framework. PhD thesis, University of Wolverhampton, UK.

Wani, D (1997) Strategies to increase the degree of participation of local companies in construction projects in developing countries. PhD thesis, University of Leeds, UK.

Yamakawa, S (1997) The development of a framework for inter-diciplinary building design working, and the application of intelligent knowledge-base system techniques. PhD thesis, Cranfield University, UK.

Yang, Z R (1997) UK construction company failure prediction: Robust heteroscedastic parzen window classifier. PhD thesis, University of Portsmouth, UK.

Yodites, R A (1997) Essential skills needed and training provided for chief school business officials in Los Angeles county to manage new and modernization construction projects. EdD thesis, University of La Verne, USA.

Yusuf, F (1997) Information and process modelling for IT implementation at the briefing stage. PhD thesis, University of Salford, UK.

Conference Paper

Abbas, N M A and Reda, R M (1997) The engineering consultancy profession "analysis and development". In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Abeysekera, W V K M and Thorpe, A (1997) Standardisation or non-standardisation? The case of brickwork in Sri Lanka. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Alkass, S; Alhussein, M and Moselhi, O (1997) Computerized crane selection for construction projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Atkinson, A (1997) The management of construction failures and defects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Austin, S; Baldwin, A and Waskett, P (1997) Development of a prototype building design management tool. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Baldry, D (1997) The image of construction and its influence upon clients, participants, and consumers. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Baldwin, A N; Austin, S A and Pendlebury, M C (1997) Interface of early design and cost advice in the building design process. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Boudjabeur, S (1997) Design and build defined. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Boyd, D and Foss, P (1997) Developing intimacy in construction industry groups. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Brown, M (1997) Compliance with health and safety legislation: Is deterrence the answer? In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Campbell, K; Clegg, D R; Perera, T; Stephenson, P and Stevens, A (1997) Simulation in the construction industry: A case-study review. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cesare, C M D and Ruddock, L (1997) Equity in property taxation: A model for establishing a fair property tax system. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cheetham, D W (1997) The search for quality: Improving the audit. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cheung, S O and Tsang, K F (1997) Professional liabilities in construction: Exposures and responses. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Chileshe, N and Watson, P (1997) TQM: A competitive weapon for the UK construction industry? In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Clegg, D R; Campbell, K; Stephenson, P and Perera, T (1997) Planning road construction using simulation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cook, S J and English, C (1997) Overspecification of speculative UK commercial office building: An international comparison. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Dainty, A R J; Bagilhole, B M and Neale, R H (1997) Analytical strategies for dealing with qualitative data in construction management research. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Dorward, F; Akintoye, A and Hardcastle, C (1997) Towards a composite cyclical leading indicator for private construction new orders. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Eccles, S; O'Reilly, M and Stovin, V (1997) Numerical modelling of contract strategy evaluation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Edum-Fotwe, F T; Thorpe, A; McCaffer, R and Price, A D F (1997) Developing construction management research: A balance of perspectives. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Evans, R C; Kaka, A P and Lewis, J (1997) Adopting a semi-ideographic approach to cash flow forecasting. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Fortune, C and Hinks, J (1997) Model selection criteria in building project price forecast formulation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Fortune, C and Lees, M (1997) Cognitive errors of judgement, learning style characteristics and clients' early cost advisors. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Greed, C (1997) Cultural change in construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Greenwood, D J and Shaglouf, A A (1997) Comparison between planned and actual durations in medium sized building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Greenwood, M (1997) Discovering an individual's "risk behaviour profile". In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Gunning, J G and Fellows, R F (1997) Perspectives on the review of research publications in construction management. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Hall, M A and Jaggar, D M (1997) Should construction enterprises, working internationally, take account of cultural differences in culture? In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Hammuda, I M and Dulaimi, M F (1997) The effects of the situational variables on the leadership styles in construction projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Hill, C J; Howarth, T A P; McNamara, E T and Watson, P (1997) A TQM approach to construction education. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Holder, L and Coffey, M (1997) Customer feedback and contractor appraisal in construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Howarth, T A P (1997) A Gadamerian hermeneutic approach to ethnographic construction research. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Hugill, D (1997) Unconscious forces in project management teams. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Jackson, S H; Griffith, A; Stephenson, P and Smith, J (1997) Risk management tools and techniques used when estimating initial budgets for building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Jamieson, I A (1997) Development of a concurrent engineering construction process protocol. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kaka, A P and Cheetham, D W (1997) The effect of some tendering and payment strategies on contractors' financial performance. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Khosrowshahi, F (1997) Construction activity in the UK recent trends and projections. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kululanga, G K; Edum-Fotwe, F T; McCaffer, R and Price, A D F (1997) Learning techniques employed by construction contractors' organisations. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kumaraswamy, M M (1997) Productivity matters. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kumaraswamy, M M; Chan, D W M; Dissanayaka, S M and Yogeswaran, K (1997) Mapping methodologies and mixing methods in construction management research. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Lam, K C; Gibb, A G F and Sher, W D (1997) An analysis of building procurement factors affecting coordination of building services. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Li, S (1997) How are Chinese construction enterprises meeting the challenge of change. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Li, S (1997) Understanding the Chinese construction market. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Lingard, H; Graham, P and Smithers, G (1997) Waste management in the Australian construction industry: A human factors approach. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Liu, A M M (1997) Developing a research model for project outcome evaluation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Lowe, J (1997) Labour productivity trends for the UK construction sector. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Machete, S M (1997) Waste management in construction sites of emerging contractors in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Mackenzie, J and Loosemore, M (1997) The value of health and safety in construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Mak, S and Wong, L (1997) Estimating using risk analysis for construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

McCabe, S; Crook, D; Rooke, J and Seymour, D (1997) Construction's experiences of attempting to become world class: The role of academics in assisting practitioners. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

McNamara, E T (1997) The current perspective of major United Kingdom construction companies on the private finance initiative. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

McNamara, E T; Howarth, T A P; Hill, C J and Stoneman, G R W (1997) Mentoring construction graduates: Bridging the gap between academia and industry. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Mohlasedi, K M and Nkado, R N (1997) The role of stakeholders in the delivery of affordable housing schemes in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Moore, D R (1997) An analysis of experimental data to determine the validity of aspects of tolerance requirement general theory. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Moore, D R (1997) An examination of the experimental design process with regard to tolerance requirement general theory. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Moore, T A and Moore, D R (1997) Project management for the construction industry: An examination of a systems approach. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Muya, M; Price, A D F and Thorpe, A (1997) Construction materials supply logistics. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Oliveira, L; Retik, A and Watson, I (1997) Intelligent training using past experiences in virtual reality: An application for scaffold inspection. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Olubodun, F and Mole, T (1997) The impact of tenants on public housing stock maintenance expenditure in the UK. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Othman, N (1997) Management of variations in construction contracts. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Pearl, R G; Bowen, P A and Nkado, R N (1997) A communication-based examination of construction planning and tendering. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Powell, M (1997) Life-cycling around Cambridge: A quest for a 'professionalism' of building. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Preece, C and Tarawneh, S (1997) Service quality for client satisfaction on design & build projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Rwelamila, P D and Machete, S M (1997) Marketing development in civil engineering consultancy firms in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Seymour, D; Mahroof, A; Rooke, J and Crook, D (1997) Objectivity in research: Negotiating a research and development role in an urban renewal department. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Sobhiyah, M H; Seymour, D E and Perry, J G (1997) The role of project start-up in the organisational development of project management: The case in Iran. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Walker, D H T and Vines, M W (1997) Construction time performance in multi-unit residential construction: Insight into the role of procurement methods. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Walker, G; Naoum, S and Howes, R (1997) Determinants of project management success. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Wang, Y S and Chau, K W (1997) An evaluation of the efficiency of construction industry in Hong Kong using the DEA approach. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Watson, A and McInnes, S (1997) Small/medium scale construction logistics: A study into the factors affecting planning accuracy. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Wong, F (1997) Implementation of safety policy and safety system for construction companies in Hong Kong: Senior management's perspective. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

This list was generated on Sat Aug 22 01:02:53 2026 UTC.