Items where Year is 1994
Article
Abdul-Aziz, A R (1994) Global strategies: A comparison between Japanese and American construction firms. Construction Management and Economics, 12(6), pp. 473-484. ISSN 01446193
Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193
Abourizk, S and Shi, J (1994) Automated construction-simulation optimization. Journal of Construction Engineering and Management, 120(2), pp. 374-385. ISSN 0733-9364
Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364
Akintoye, A and Skitmore, M (1994) Models of UK private sector quarterly construction demand. Construction Management and Economics, 12(1), pp. 3-13. ISSN 01446193
Akintoye, S A and Skitmore, R M (1994) A comparative analysis of three macro price forecasting models. Construction Management and Economics, 12(3), pp. 257-270. ISSN 01446193
Al-Harbi, K M; Johnston, D W and Fayadh, H (1994) Building construction detailed estimating practices in saudi arabia. Journal of Construction Engineering and Management, 120(4), pp. 774-784. ISSN 0733-9364
Amirkhanian, S N; Burati, J L and Mirchandani, H C (1994) Effect of testing variability on contractor payment for asphalt pavements. Journal of Construction Engineering and Management, 120(3), pp. 579-592. ISSN 0733-9364
Aouad, G F; Ford, S R; Kirkham, J A; Child, T; Cooper, G S; Brandon, P S; Brown, F E; Oxman, R E and Young, B (1994) Knowledge elicitation using protocol analysis in a workshop environment. Construction Management and Economics, 12(3), pp. 271-278. ISSN 01446193
Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193
Bai, Y and Amirkhanian, S N (1994) Knowledge-based expert system for concrete mix design. Journal of Construction Engineering and Management, 120(2), pp. 357-373. ISSN 0733-9364
Bambrick, B (1994) Construction of an island. Journal of Construction Engineering and Management, 120(1), pp. 223-227. ISSN 0733-9364
Betts, M and Ofori, G (1994) Strategic planning for competitive advantage in construction: The institutions. Construction Management and Economics, 12(3), pp. 203-217. ISSN 01446193
Betts, M and Wood-Harper, T (1994) Re-engineering construction: A new management research agenda. Construction Management and Economics, 12(6), pp. 551-556. ISSN 01446193
Bishop, D (1994) The professionals' view of the Health and Safety Commission's draft Construction (Design and Management) Regulations. Construction Management and Economics, 12(4), pp. 365-372. ISSN 01446193
Br chner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(2), pp. 91-101. ISSN 0969-9988
Cannon, J (1994) Lies and construction statistics. Construction Management and Economics, 12(4), pp. 307-313. ISSN 01446193
Carrillo, P (1994) Technology transfer: A survey of international construction companies. Construction Management and Economics, 12(1), pp. 45-51. ISSN 01446193
Cohenca-Zall, D; Laufer, A; Shapira, A and Howell, G A (1994) Process of planning during construction. Journal of Construction Engineering and Management, 120(3), pp. 561-578. ISSN 0733-9364
Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193
Dowding, C H (1994) Ground motions and air-blast effects of explosive demolition of structures. Journal of Construction Engineering and Management, 120(4), pp. 838-856. ISSN 0733-9364
Duff, A R; Robertson, I T; Phillips, R A and Cooper, M D (1994) Improving safety by the modification of behaviour. Construction Management and Economics, 12(1), pp. 67-78. ISSN 01446193
El-Itr, Z and Kangari, R (1994) Minority contractors: Framework for new policy development. Journal of Construction Engineering and Management, 120(3), pp. 632-648. ISSN 0733-9364
Everett, J G and Farghal, S (1994) Learning curve predictors for construction field operations. Journal of Construction Engineering and Management, 120(3), pp. 603-616. ISSN 0733-9364
Everett, J G and Slocum, A H (1994) Automation and robotics opportunities: Construction versus manufacturing. Journal of Construction Engineering and Management, 120(2), pp. 443-452. ISSN 0733-9364
Faniran, O O; Oluwoye, J O and Lenard, D (1994) Effective construction planning. Construction Management and Economics, 12(6), pp. 485-499. ISSN 01446193
Farid, F and Koning, T L (1994) Simulation verifies queuing program for selecting loader-truck fleets. Journal of Construction Engineering and Management, 120(2), pp. 386-404. ISSN 0733-9364
Fortune, C and Skitmore, M (1994) Quantification skills in the construction industry. Construction Management and Economics, 12(1), pp. 79-88. ISSN 01446193
Furuya, N; Yamaoka, R and Paulson, B C (1994) Construction of Akashi-Kaikyo bridge west anchorage. Journal of Construction Engineering and Management, 120(2), pp. 337-356. ISSN 0733-9364
Ganesan, S (1994) Employment maximization in construction in developing countries. Construction Management and Economics, 12(4), pp. 323-335. ISSN 01446193
Gavilan, R M and Bernold, L E (1994) Source evaluation of solid waste in building construction. Journal of Construction Engineering and Management, 120(3), pp. 536-552. ISSN 0733-9364
Gordon, C M (1994) Choosing appropriate construction contracting method. Journal of Construction Engineering and Management, 120(1), pp. 196-210. ISSN 0733-9364
Grimm, C T (1994) Void mortar joints: Bane of brick masonry. Journal of Construction Engineering and Management, 120(1), pp. 152-161. ISSN 0733-9364
Groák, S (1994) Is construction an industry? Notes towards a greater analytic emphasis on external linkages. Construction Management and Economics, 12(4), pp. 287-293. ISSN 01446193
Gugel, J G and Russell, J S (1994) Model for constructability approach selection. Journal of Construction Engineering and Management, 120(3), pp. 509-521. ISSN 0733-9364
Halligan, D W; Demsetz, L A; Brown, J D and Pace, C B (1994) Action-response model and loss of productivity in construction. Journal of Construction Engineering and Management, 120(1), pp. 47-64. ISSN 0733-9364
Heath, T; Scott, D and Boyland, M (1994) A prototype computer-based design management tool. Construction Management and Economics, 12(6), pp. 543-549. ISSN 01446193
Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988
Hinze, J and Brown, J (1994) Properties of soundless chemical demolition agents. Journal of Construction Engineering and Management, 120(4), pp. 816-827. ISSN 0733-9364
Hinze, J and Tracey, A (1994) The contractor-subcontractor relationship: The subcontractor's view. Journal of Construction Engineering and Management, 120(2), pp. 274-287. ISSN 0733-9364
Holt, G D; Olomolaiye, P O and Harris, F C (1994) Evaluating performance potential in the selection of construction contractors. Engineering, Construction and Architectural Management, 1(1), pp. 29-50. ISSN 0969-9988
Ive, G (1994) A theory of ownership types applied to the construction majors. Construction Management and Economics, 12(4), pp. 349-364. ISSN 01446193
Jaselskis, E J and Suazo, G A R (1994) A survey of construction site safety in Honduras. Construction Management and Economics, 12(3), pp. 245-255. ISSN 01446193
Jergeas, G F and Hartman, F T (1994) Contractors' construction-claims avoidance. Journal of Construction Engineering and Management, 120(3), pp. 553-560. ISSN 0733-9364
Kaka, A P and Price, A D (1994) A survey of contractors' corporate planning and financial budgeting: Contractors lack effective and accurate methods of corporate planning, financial budgeting and cashflow forecasting identified in survey of 15 british construction companies. Building Research & Information, 22(3), pp. 174-182. ISSN 0961-3218
Khalid, G (1994) Obsolescence in hedonic price estimation of the financial impact of commercial office buildings: The case of Kuala Lumpur. Construction Management and Economics, 12(1), pp. 37-44. ISSN 01446193
Kometa, S T; Olomolaiye, P O and Harris, F C (1994) Attributes of UK construction clients influencing project consultants' performance. Construction Management and Economics, 12(5), pp. 433-443. ISSN 01446193
Laborde, M and Sanvido, V (1994) Introducing new process technologies into construction companies. Journal of Construction Engineering and Management, 120(3), pp. 488-508. ISSN 0733-9364
Lansley, P (1994) Analysing construction organizations. Construction Management and Economics, 12(4), pp. 337-348. ISSN 01446193
Laufer, A; Tucker, R L; Shapira, A and Shenhar, A J (1994) The multiplicity concept in construction project planning. Construction Management and Economics, 12(1), pp. 53-65. ISSN 01446193
Ledbetter, W B (1994) Quality performance on successful project. Journal of Construction Engineering and Management, 120(1), pp. 34-46. ISSN 0733-9364
Lingard, H and Rowlinson, S (1994) Construction site safety in Hong Kong. Construction Management and Economics, 12(6), pp. 501-510. ISSN 01446193
Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(2), pp. 115-137. ISSN 0969-9988
Loosemore, M (1994) Problem behaviour. Construction Management and Economics, 12(6), pp. 511-520. ISSN 01446193
Loraine, R K (1994) Project specific partnering. Engineering, Construction and Architectural Management, 1(1), pp. 5-16. ISSN 0969-9988
Lowe, D and Skitmore, M (1994) Experiential learning in cost estimating. Construction Management and Economics, 12(5), pp. 423-431. ISSN 01446193
Lutz, J D; Halpin, D W and Wilson, J R (1994) Simulation of learning development in repetitive construction. Journal of Construction Engineering and Management, 120(4), pp. 753-773. ISSN 0733-9364
Mahoney, J J and Tatum, C B (1994) Construction site applications of CAD. Journal of Construction Engineering and Management, 120(3), pp. 617-631. ISSN 0733-9364
McCullouch, B G and Lueprasert, K (1994) 2D bar-code applications in construction. Journal of Construction Engineering and Management, 120(4), pp. 739-752. ISSN 0733-9364
Meikle, J L and Connaughton, J N (1994) How long should housing last? Some implications of the age and probable life of housing in England. Construction Management and Economics, 12(4), pp. 315-321. ISSN 01446193
Merna, A and Smith, N J (1994) Concession contracts for power generation. Engineering, Construction and Architectural Management, 1(1), pp. 17-27. ISSN 0969-9988
Naoum, S G (1994) Critical analysis of time and cost of management and traditional contracts. Journal of Construction Engineering and Management, 120(4), pp. 687-705. ISSN 0733-9364
Ndekugri, I and Turner, A (1994) Building procurement by design and build approach. Journal of Construction Engineering and Management, 120(2), pp. 243-256. ISSN 0733-9364
Neufville, R D and Smith, J T (1994) Improving contractors' bids using preference reversal phenomenon. Journal of Construction Engineering and Management, 120(4), pp. 706-719. ISSN 0733-9364
Nishigaki, S; Vavrin, J; Kano, N; Haga, T; Kunz, J C and Law, K (1994) Humanware, human error, and hiyari-hat: A template of unsafe symptoms. Journal of Construction Engineering and Management, 120(2), pp. 421-442. ISSN 0733-9364
O'Brien, M and Al-Soufi, A (1994) A survey of data communications in the UK construction industry. Construction Management and Economics, 12(5), pp. 457-465. ISSN 01446193
O'Reilly, M P and Mawdesley, M J (1994) The evaluation of construction disputes: A risk approach. Engineering, Construction and Architectural Management, 1(2), pp. 103-114. ISSN 0969-9988
Ofori, G (1994) Construction industry development: Role of technology transfer. Construction Management and Economics, 12(5), pp. 379-392. ISSN 01446193
Ofori, G (1994) Establishing construction economics as an academic discipline. Construction Management and Economics, 12(4), pp. 295-306. ISSN 01446193
Ofori, G (1994) Formulating a long-term strategy for developing the construction industry of Singapore. Construction Management and Economics, 12(3), pp. 219-231. ISSN 01446193
Oloufa, A A; Eltahan, A A and Papacostas, C S (1994) Integrated GIS for construction site investigation. Journal of Construction Engineering and Management, 120(1), pp. 211-222. ISSN 0733-9364
Perkinson, G M; Sanvido, V E and Grobler, F (1994) A facility programming information framework. Engineering, Construction and Architectural Management, 1(1), pp. 69-84. ISSN 0969-9988
Pin, T H and Scott, W F (1994) Bidding model for refurbishment work. Journal of Construction Engineering and Management, 120(2), pp. 257-273. ISSN 0733-9364
Poortman, E R and Norbert M. Bons, H (1994) Information for the management of the building? Materials flow. Engineering, Construction and Architectural Management, 1(2), pp. 139-146. ISSN 0969-9988
Ranasinghe, M (1994) Contingency allocation and management for building projects. Construction Management and Economics, 12(3), pp. 233-243. ISSN 01446193
Ranasinghe, M (1994) Quantification and management of uncertainty in activity duration networks. Construction Management and Economics, 12(1), pp. 15-29. ISSN 01446193
Reyna, S M; Vanegas, J A and Khan, A H (1994) Construction technologies for sewer rehabilitation. Journal of Construction Engineering and Management, 120(3), pp. 467-487. ISSN 0733-9364
Riad, N I; Arditi, D and Mohammadi, J (1994) Integrated system for managing owner-directed project acceleration. Journal of Construction Engineering and Management, 120(1), pp. 77-95. ISSN 0733-9364
Rosenfeld, Y (1994) Innovative construction methods. Construction Management and Economics, 12(6), pp. 521-541. ISSN 01446193
Russell, A D and Fayek, A (1994) Automated corrective action selection assistant. Journal of Construction Engineering and Management, 120(1), pp. 11-33. ISSN 0733-9364
Russell, J S; Gugel, J G and Radtke, M W (1994) Comparative analysis of three constructability approaches. Journal of Construction Engineering and Management, 120(1), pp. 180-195. ISSN 0733-9364
Rwelamila, P D (1994) Group dynamics and construction project manager. Journal of Construction Engineering and Management, 120(1), pp. 3-10. ISSN 0733-9364
Salim, M D and Bernold, L E (1994) Effects of design-integrated process planning on productivity in rebar placement. Journal of Construction Engineering and Management, 120(4), pp. 720-738. ISSN 0733-9364
Semple, C; Hartman, F T and Jergeas, G (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), pp. 785-795. ISSN 0733-9364
Severson, G D; Russell, J S and Jaselskis, E J (1994) Predicting contract surety bond claims using contractor financial data. Journal of Construction Engineering and Management, 120(2), pp. 405-420. ISSN 0733-9364
Songer, A D; Ibbs, C W and Napier, T R (1994) Process model for public sector design-build planning. Journal of Construction Engineering and Management, 120(4), pp. 857-874. ISSN 0733-9364
Stevens, J D and Murray, A L (1994) Modified roof erection system. Journal of Construction Engineering and Management, 120(4), pp. 828-837. ISSN 0733-9364
Suhail, S A and Neale, R H (1994) CPM/LOB: New methodology to integrate CPM and line of balance. Journal of Construction Engineering and Management, 120(3), pp. 667-684. ISSN 0733-9364
Swiggum, K E; Anderson, S D and Russell, J S (1994) Case study of burlington cable-stayed bridge. Journal of Construction Engineering and Management, 120(3), pp. 649-666. ISSN 0733-9364
Tah, J H M; Thorpe, A and McCaffer, R (1994) A survey of indirect cost estimating in practice. Construction Management and Economics, 12(1), pp. 31-36. ISSN 01446193
Tanwani, R and Iseley, D T (1994) Tracking and steering systems in trenchless construction. Journal of Construction Engineering and Management, 120(1), pp. 65-76. ISSN 0733-9364
Teicholz, P and Fischer, M (1994) Strategy for computer integrated construction technology. Journal of Construction Engineering and Management, 120(1), pp. 117-131. ISSN 0733-9364
Thabet, W Y and Beliveau, Y J (1994) HVLS: Horizontal and vertical logic scheduling for multistory projects. Journal of Construction Engineering and Management, 120(4), pp. 875-892. ISSN 0733-9364
Thabet, W Y and Beliveau, Y J (1994) Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management, 120(1), pp. 96-116. ISSN 0733-9364
Thomas, H R and Sakarcan, A S (1994) Forecasting labor productivity using factor model. Journal of Construction Engineering and Management, 120(1), pp. 228-239. ISSN 0733-9364
Thomas, H R; Smith, G R and Mellott, R E (1994) Interpretation of construction contracts. Journal of Construction Engineering and Management, 120(2), pp. 321-336. ISSN 0733-9364
Tommelein, I D; Carr, R I and Odeh, A M (1994) Assembly of simulation networks using designs, plans, and methods. Journal of Construction Engineering and Management, 120(4), pp. 796-815. ISSN 0733-9364
Tsimberdonis, A I and Murphree, E L (1994) Equipment management through operational failure costs. Journal of Construction Engineering and Management, 120(3), pp. 522-535. ISSN 0733-9364
Walker, A. and Kalinowski, M. (1994) An anatomy of a Hong Kong project - organization, environment and leadership. Construction Management and Economics, 12(3), pp. 191-202. ISSN 0144-6193
Walker, A and Kalinowski, M (1994) An anatomy of a Hong Kong project: organization, environment and leadership. Construction Management and Economics, 12(3), pp. 191-202. ISSN 01446193
Warszawski, A and Rosenfeld, Y (1994) Robot for interior-finishing works in building: Feasibility analysis. Journal of Construction Engineering and Management, 120(1), pp. 132-151. ISSN 0733-9364
Williams, T P (1994) Predicting changes in construction cost indexes using neural networks. Journal of Construction Engineering and Management, 120(2), pp. 306-320. ISSN 0733-9364
Woolery, J C (1994) Developing specifications for cellular-telephone base stations. Journal of Construction Engineering and Management, 120(3), pp. 593-602. ISSN 0733-9364
Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364
Thesis
Abouel-Enin, M A (1994) An empirical study of factors influencing the success of Egypt-United States of America joint ventures engaging in businesses in Egypt. PhD thesis, United States International University, USA.
Ahmad, A G B (1994) Conservation of British colonial buildings built between 1800 and 1930 in Malaysia. PhD thesis, University of Sheffield, UK.
Aliero, B A (1994) Utilisation of environmental impact assessment technique in the assessment of impact of human interference on natural ecology of estuaries: a case study of Mersey Estuary. PhD thesis, University of Salford, UK.
Alkaabi, J A (1994) Improved materials management using automatic identification techniques. PhD thesis, Loughborough University, UK.
Appau, K A (1994) An integrated model of computer-aided cost estimating/scheduling in construction management. PhD thesis, Georgia Institute of Technology, USA.
Back, W E (1994) Quantifying benefits of electronic technology applied to bulk materials management. PhD thesis, Clemson University, USA.
Basri, H (1994) An expert system for preliminary landfill design in developing countries. PhD thesis, University of Leeds, UK.
Bell, K L (1994) The strategic management of projects to enhance value for money for BAA plc. PhD thesis, Heriot-Watt University, UK.
Bourdakis, V (1994) Performance appraisal of sportshall and swimming pool buildings in Greece. PhD thesis, University of Bath, UK.
Bray Jr., H G (1994) Domestic construction contractors and ISO 9000 registration. DE thesis, Louisiana Tech University, USA.
Browning, F R (1994) Planning system for hazardous waste site characterization. PhD thesis, University of Missouri - Rolla, USA.
Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.
Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.
Cho, M (1994) Productivity analysis in construction using an expert system approach. PhD thesis, University of Manchester, UK.
Chowdhury, A A (1994) An object-oriented finite element formulation for construction simulation. PhD thesis, Lehigh University, USA.
Christiansen, T R (1994) Modeling efficiency and effectiveness of coordination in engineering design teams. PhD thesis, Stanford University, USA.
Cooper, T E (1994) A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document. PhD thesis, Auburn University, USA.
Cox, R F (1994) Case studies of employee participation programs in construction and their effects on absenteeism. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Curtis, B (1994) Roles, responsibilities and risks in management contracts. PhD thesis, University of Southampton, UK.
De Ridder, H A J (1994) Design and construct of complex civil engineering systems: A new approach to organization and contracts. PhD thesis, Delft University of Technology, Netherlands.
Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.
Dias Jr., A (1994) A managerial and financial study on the involvement of private sector companies in the development, construction, operation, and ownership of infrastructure projects. PhD thesis, University of Michigan, USA.
Dixon, T J (1994) An analysis of IT skills training and education in the surveying profession. PhD thesis, University of Reading, UK.
Douglas, J C (1994) Aesthetic-based conflict in highway planning: Federal highway administration putting planners at risk. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Doyle, M G (1994) Postgraduate education for European construction management. PhD thesis, Trinity College Dublin, Ireland.
Drew, D S (1994) The effect of contract type and size on competitiveness in construction contract bidding. PhD thesis, University of Salford, UK.
Egbu, C O (1994) Management education and training for refurbishment work within the construction industry. PhD thesis, University of Salford, UK.
El-Choum, M K (1994) Identification and modelling of construction cost overruns parameters for public infrastructure projects using multivariate statistical methods. PhD thesis, Stevens Institute of Technology, USA.
Emsoff, J E (1994) An object-oriented environment for the visual integration of project scheduling data. PhD thesis, Texas A&M University, USA.
Fahmie, M M (1994) A knowledge-based expert system approach to analyze and evaluate highway construction schedules. PhD thesis, Florida University, USA.
Farbarik, J J (1994) Evaluation of the efficacy of using bid data to predict construction cost overruns. PhD thesis, University of Washington, USA.
Fatani, A A (1994) Factors influencing the success and failure of British construction companies working in joint ventures with Saudi partners. PhD thesis, Loughborough University, UK.
Flinkman, M (1994) The market for sawnwood in Germany: Analysis and forecast to the year 2000. SkoglDr thesis, Sveriges Lantbruksuniversitet, Sweden.
Fox, D S J (1994) Knowledge-based systems for the demolition industry. PhD thesis, University of Portsmouth, UK.
Fujino, T (1994) The development of a method for investigating construction site accidents using fuzzy fault tree analysis. PhD thesis, Ohio State University, USA.
Gale, A W (1994) Women in construction: An investigation into some of the aspects of image and knowledge as determinants of the under representation of women in construction management in the British construction industry. PhD thesis, University of Bath, UK.
George, T H (1994) A model of vocational, technical and apprenticeship craft training required to meet the needs of the construction industry in Florida. PhD thesis, University of Florida, USA.
Hamilton, M R (1994) The relationship between pre-project planning effort and success for capital construction projects. PhD thesis, University of Texas at Austin, USA.
Hampson, K D (1994) Technology strategy and competitive performance: A study of bridge construction. PhD thesis, Stanford University, USA.
Hastak, M (1994) Decision support system for project cost control strategy and planning. PhD thesis, Purdue University, USA.
Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.
Houlihan, T J (1994) The New York City building trades, 1890-1910. PhD thesis, State University of New York at Binghamton, USA.
Hsie, M (1994) Computer-aided acceptance planning: Generating quality acceptance parameters and stratified sampling plans through neural network learning ability and CAD modeling. PhD thesis, Purdue University, USA.
Huang, P-Y (1994) Extensible object-oriented computer-aided design system. PhD thesis, University of Colorado at Boulder, USA.
Huang, R-Y (1994) A graphical-based method for transient evaluation of construction operations. PhD thesis, Purdue University, USA.
Huber, J G (1994) Comparison of formal student outcomes assessment programs in construction education academic units of four-year colleges and universities in the United States and comparison of the attitudes of construction education unit administrators. PhD thesis, University of Kansas, USA.
Izzudin Mohd Ali, M Y (1994) Critical investigation of joint ventures by UK contractors with other European partners. PhD thesis, Loughborough University, UK.
Jeljeli, M N (1994) A risk-based methodology for estimating contractors' liability in superfund cleanup construction. PhD thesis, University of Wisconsin - Madison, USA.
Karunaratne, Banneka Mudiyanselage (1994) A new method of analysis for cyclic construction operations using systems engineering approach. PhD thesis, University of New South Wales, Australia.
Keane, P J (1994) A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects. PhD thesis, Loughborough University, UK.
Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.
Khalil, Khalili (1994) An evaluation of managerial knowledge and skills of technical professionals in the construction industry in Malaysia. PhD thesis, University of New South Wales, Australia.
Kim, I (1994) Data representations in an integrated architectural design environment: Unified data organisation and management. PhD thesis, University of Strathclyde, UK.
Kim, Yong-Su (1994) The development and application of a probabilistic model for risk analysis of life cycle cost predictions: For apartment buildings constructed by the Korea National Housing Corporation in Seoul, Korea. PhD thesis, University of New South Wales, Australia.
Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.
Kliewer, J E (1994) Development of performance based test procedures for asphalt mixtures. PhD thesis, Oregon State University, USA.
Kumar, A (1994) Development of a model for determining workzone illumination requirements during nighttime highway construction. PhD thesis, University of Florida, USA.
Kuntz, K A (1994) A construction crew evaluation model to improve craft productivity. PhD thesis, Pennsylvania State University, USA.
Langston, Craig A (1994) The determination of equivalent value in life-cost studies: An intergenerational approach. PhD thesis, University of Technology Sydney, Australia.
Lee, K (1994) Software options for support of three-dimensional CAD in the architectural design process: A critical evaluation by practitioners and educators. PhD thesis, Texas A&M University, USA.
Lee, K H (1994) Empirical analysis of selected topics in the Korean construction and land markets. PhD thesis, University of Pennsylvania, USA.
Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.
Lin, L-k (1994) Improving the productivity of roadway construction job sites with a portable expert system. PhD thesis, University of Utah, USA.
Liston, J (1994) Contractor prequalification. PhD thesis, Queensland University of Technology, Australia.
Lofqvist, P (1994) Knowledge-based systems for preliminary design of structures. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Luiten, G T (1994) Computer aided design for construction in the building industry. PhD thesis, Delft University of Technology, Netherlands.
Luiten, G T (1994) Computer-aided design for construction in the building industry. Dr thesis, Delft University of Technology, Netherlands.
Masterman, J W E (1994) A study of the bases upon which clients of the construction industry choose their building procurement systems. PhD thesis, University of Manchester, UK.
McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.
McLellan, R (1994) The use of project management procedures by construction contractors. PhD thesis, University of Strathclyde, UK.
McNerney, M T (1994) The use of geographical information systems for airport engineering and management. PhD thesis, University of Texas at Austin, USA.
McNicholas, T M (1994) Potential barriers to the adoption of new technology in the United States construction industry. DBA thesis, Golden Gate University, USA.
Meaker, T A (1994) The role of intervention in strategic change. PhD thesis, City, University of London, UK.
Messner, J I (1994) An information framework for evaluating international construction projects. PhD thesis, Pennsylvania State University, USA.
Minato, T (1994) A methodology for project risk control: A work package-based approach using historical cost control data. PhD thesis, University of California, Berkeley, USA.
Mohammed, Miswan Abdul Hakim (1994) An investigation into firms' strategies and their financial performance in the UK construction industry. PhD thesis, University College London, UK.
Morcos, M S (1994) Decision support system for reliability assessment of management systems of organisations in the construction industry. PhD thesis, University of Leeds, UK.
Nathan, K V S K (1994) Submission to ICSID in breach of the convention: disputes in international civil engineering contracts. PhD thesis, Queen Mary University of London, UK.
Okuwoga, A A (1994) Construction cost escalation and resource planning in Nigeria: A case study of public sector housing projects 1975-90. PhD thesis, University College London, UK.
Ong, A T (1994) Strategic development of firms in the dynamic business environment: a case on the construction industry in Singapore. Unpublished PhD thesis, Curtin University of Technology, Australia.
Op den Bosch, A (1994) Design/construction processes simulation in real-time object-oriented environments. PhD thesis, Georgia Institute of Technology, USA.
Pasiphol, S (1994) New concepts for total float distribution in CPM project scheduling. PhD thesis, University of Texas at Austin, USA.
Pena Mora, F A (1994) Design rationale for computer supported conflict mitigation during the design-construction process of large-scale civil engineering systems. PhD thesis, Massachusetts Institute of Technology, USA.
Pugh, T E (1994) Design-construction interface performance on traditional capital improvement projects. PhD thesis, University of Texas at Austin, USA.
Raynar, K A (1994) Integrating computer vision with computer aided design to produce construction as-built drawings. PhD thesis, Pennsylvania State University, USA.
Rho, J-J (1994) A systems engineering model for implementing automation technology into a construction process. PhD thesis, University of Houston, USA.
Riley, D R (1994) Modeling the space behavior of construction activities. PhD thesis, Pennsylvania State University, USA.
Ruddock, L (1994) Performance and efficiency measurement in local authority building organisations. PhD thesis, University of Salford, UK.
Sawhney, A (1994) Simulation-based planning for construction. PhD thesis, University of Alberta, Canada.
Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.
Simister, S J (1994) An investigation into the influences on construction professionals' working practices. PhD thesis, University of Reading, UK.
Smith, S D (1994) Production estimation of earthmoving operations using a discrete-event simulation model. PhD thesis, University of Edinburgh, UK.
Ta'i, Behnam (1994) Critical evaluation of stormwater management practices on urban construction sites in the Sydney region. PhD thesis, University of New South Wales, Australia.
Taha, M A-E (1994) Applying distributed artificial intelligence to the prequalification of construction contractors. PhD thesis, University of Wisconsin - Madison, USA.
Thomas, C S (1994) Aspects of building contracts: A comparative view of english and french law in the light of potential harmonisation. PhD thesis, King's College London, UK.
Toole, T M (1994) Task and environmental uncertainty and adoption of technological innovations by home builders. PhD thesis, Massachusetts Institute of Technology, USA.
Vanier, D J (1994) A parsimonious classification system to extract project-specific building codes. PhD thesis, Universite de Montreal, Canada.
Walker, D H T (1994) An investigation into factors that determine building construction time performance. PhD thesis, Royal Melbourne Institute of Technology, Australia.
Yaworsky, R A (1994) Risk planning for large and BOT projects: A holistic framework. PhD thesis, University of British Columbia, Canada.
de Oliveira, R (1994) A methodology for housing design. PhD thesis, University of Waterloo, Canada.
Up a level