Items where Year is 1993
Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity. PhD thesis, University of Wisconsin - Madison, USA.
Abourizk, S M and Dozzi, S P (1993) Application of computer simulation in resolving construction disputes. Journal of Construction Engineering and Management, 119(2), pp. 355-373. ISSN 0733-9364
Abu-Hijleh, S F and Ibbs, C W (1993) Systematic automated management exception reporting. Journal of Construction Engineering and Management, 119(1), pp. 87-104. ISSN 0733-9364
Adams, Olugboyega A (1993) Management training needs of Nigerian indigenous contractors and their preferred training delivery systems. PhD thesis, University College London, UK.
Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects. PhD thesis, University of Florida, USA.
Ahmed, S M (1993) An integrated total quality management (TQM) model for the construction process. PhD thesis, Georgia Institute of Technology, USA.
Alkass, S; Arouian, A and Moselhi, O (1993) Computer-aided equipment selection for transporting and placing concrete. Journal of Construction Engineering and Management, 119(3), pp. 445-465. ISSN 0733-9364
Alkayyali, O J (1993) A computerized multi-dimensional support system (CM-DSS) for planning, scheduling and controlling construction projects. PhD thesis, University of Cincinnati, USA.
Alzubaidi, H J (1993) Maintenance modelling of a major hospital complex. PhD thesis, University of Salford, UK.
Aouad, G F; Kirkham, J A; Cooper, G S; Ford, S; Sarshar, M; Brandon, P S; Brown, F E; Oxman, R E and Young, B (1993) Information modelling in the construction industry: The information engineering approach. Construction Management and Economics, 11(5), pp. 384-397. ISSN 01446193
Arslan, M (1993) Public investment and infrastructure planning: A policy modelling approach for the Turkish investment sector. PhD thesis, Colorado State University, USA.
Atkin, B (1993) Stereotypes and themes in building designs: Insights for model builders. Construction Management and Economics, 11(2), pp. 119-130. ISSN 01446193
Barnes, W C (1993) Microcomputers in management of construction operations. Journal of Construction Engineering and Management, 119(2), pp. 403-412. ISSN 0733-9364
Beliveau, Y; Dixit, S and Dal, T (1993) Dynamic damping of payload motion for cranes. Journal of Construction Engineering and Management, 119(3), pp. 631-644. ISSN 0733-9364
Beliveau, Y J; Dixit, S S; Dal, T and Morad, A A (1993) Multitask motion planning for material handling in construction. Journal of Construction Engineering and Management, 119(1), pp. 180-191. ISSN 0733-9364
Bennett, J (1993) Japan's building industry: The new model. Construction Management and Economics, 11(1), pp. 3-17. ISSN 01446193
Bernold, L E and Guler, N (1993) Analysis of back injuries in construction. Journal of Construction Engineering and Management, 119(3), pp. 607-621. ISSN 0733-9364
Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364
Betts, M and Lansley, P (1993) Construction management and economics: A review of the first ten years. Construction Management and Economics, 11(4), pp. 221-245. ISSN 01446193
Betts, M and Liow, S R (1993) The relationship between teaching methods and educational objectives in building education. Construction Management and Economics, 11(2), pp. 131-141. ISSN 01446193
Birnie, J W (1993) A behavioural study using decision analysis of building cost prediction by chartered quantity surveyors. PhD thesis, Ulster University, UK.
Bon, R and Pietroforte, R (1993) New construction versus maintenance and repair construction technology in the US since World War II. Construction Management and Economics, 11(2), pp. 151-162. ISSN 01446193
Bowen, P A (1993) A communication-based approach to price modelling and price forecasting in the design phase of the traditional building procurement process in South Africa. Unpublished PhD thesis, University of Port Elizabeth, South Africa.
Carr, R I (1993) Cost, schedule, and time variances and integration. Journal of Construction Engineering and Management, 119(2), pp. 245-265. ISSN 0733-9364
Charoenngam, C (1993) A knowledge-base representation for a construction measurement control information system (CMCIS). PhD thesis, University of Texas at Austin, USA.
Chau, K W (1993) Estimating industry-level productivity trends in the building industry from building cost and price data. Construction Management and Economics, 11(5), pp. 370-383. ISSN 01446193
Clark, G G (1993) Rule-based integrated building management systems. PhD thesis, Brunel University, UK.
Cockerill, J E (1993) The construction industry in belfast 1800-1914. PhD thesis, Queen's University Belfast, UK.
Connaughton, J N (1993) Making and implementing industrial building investment decisions. PhD thesis, University of Greenwich, UK.
Davenport, P (1993) Extensions of time: time for change. Construction Management and Economics, 11(4), pp. 305-307. ISSN 01446193
Dawood, N N and Neale, R H (1993) Forecasting the sales of precast concrete building products. Construction Management and Economics, 11(2), pp. 81-98. ISSN 01446193
Diaz, C F and Hadipriono, F C (1993) Nondeterministic networking methods. Journal of Construction Engineering and Management, 119(1), pp. 40-57. ISSN 0733-9364
Diaz-Murillo, M (1993) A strategy for the implementation of quality function deployment in the design-construction industry. PhD thesis, Texas A&M University, USA.
Djebarni, R (1993) Leadership patterns in the construction industry in Algeria. PhD thesis, University of Reading, UK.
Dong, W (1993) A mortality study of workers in the British construction industry, 1975-1987. PhD thesis, University of London, London School of Hygiene and Tropical Medicine, UK.
Dreicer, G K (1993) The long span. Intercultural exchange in building technology: Development and industrialization of the framed beam in Western Europe and the United States, 1820-1870. PhD thesis, Cornell University, USA.
Eaglestone, F N (1993) An improved method of requesting insurance under UK construction contracts. PhD thesis, City, University of London, UK.
East, E W and Kim, S (1993) Standardizing scheduling data exchange. Journal of Construction Engineering and Management, 119(2), pp. 215-225. ISSN 0733-9364
Egan, T P (1993) Home restoration cooperative: A case study of a small construction craft skill worker participative cooperative. PhD thesis, University of Kentucky, USA.
El-Shahhat, A M (1993) Safety of concrete high-rise buildings during construction. PhD thesis, Purdue University, USA.
El-Sharkawy, A R (1993) Pricing construction contracts under inflation. PhD thesis, North Carolina State University, USA.
Elinwa, A U and Buba, S A (1993) Construction cost factors in Nigeria. Journal of Construction Engineering and Management, 119(4), pp. 698-713. ISSN 0733-9364
Everett, J G and Slocum, A H (1993) Cranium: Device for improving crane productivity and safety. Journal of Construction Engineering and Management, 119(1), pp. 23-39. ISSN 0733-9364
Farran, H H (1993) A study of the implementation and impact of turn-key management contracts in hospitals in the kingdom of Saudi Arabia. PhD thesis, Swansea University, UK.
Faulkenberry, L M (1993) Impact of emerging contract employment patterns on training, competitiveness, and company operation in the electrical construction industry. EdD thesis, Texas A&M University, USA.
Federle, M O; Rowings, J E and Devany, T S (1993) Model of career choice for craftworkers. Journal of Construction Engineering and Management, 119(1), pp. 105-114. ISSN 0733-9364
Ferguson, D W (1993) Public works program management using owner-consultant partnerships: Organizational factors influencing effectiveness. PhD thesis, Claremont Graduate University, USA.
Fergusson, K J (1993) Impact of integration on industrial facility quality. PhD thesis, Stanford University, USA.
Foju, B A (1993) The role of facilities management (maintenance) on office worker performance in Yaounde, Cameroon. ArchDr thesis, University of Michigan, USA.
Fuyama, H (1993) Computer assisted conceptual structural design of steel buildings. PhD thesis, Stanford University, USA.
Gann, D M (1993) Innovation in the built environment: The rise of digital buildings. DPhil thesis, University of Sussex, UK.
Gardiner, P D (1993) Conflict analysis in construction project management. PhD thesis, Durham University, UK.
Gidado, K (1993) Numerical index of complexity in building construction with particular consideration to its effect on production time. PhD thesis, University of Brighton, UK.
Glagola, C R (1993) A model of current quality performance measurements for industrial construction. PhD thesis, Clemson University, USA.
Gonzalez-Quevedo, A A; Abourizk, S M; Iseley, D T and Halpin, D W (1993) Comparison of two simulation methodologies in construction. Journal of Construction Engineering and Management, 119(3), pp. 573-589. ISSN 0733-9364
Hadavi, A and Krizek, R J (1993) Short-term goal setting for construction. Journal of Construction Engineering and Management, 119(3), pp. 622-630. ISSN 0733-9364
Halpin, D W (1993) Process-based research to meet the international challenge. Journal of Construction Engineering and Management, 119(3), pp. 417-425. ISSN 0733-9364
Hansen, K L (1993) How strategies happen: An investigation of the decision to upgrade CAD/CIE in architectural, engineering, and construction firms. PhD thesis, Stanford University, USA.
Harison, J C (1993) Laboring class, dangerous class, insurgent class: The Paris building trades, 1830-1871. PhD thesis, University of Iowa, USA.
Hartman, F T (1993) Construction dispute reduction through an improved contracting process in the Canadian context. PhD thesis, Loughborough University, UK.
Harun, Z B (1993) Computer simulation in decision support systems for management of construction projects. PhD thesis, University of Leeds, UK.
Hastak, M; Vanegas, J A and Puyana-Camargo, M (1993) Time-based competition: Competitive advantage tool for A/E/C firms. Journal of Construction Engineering and Management, 119(4), pp. 785-800. ISSN 0733-9364
Hicks, J C (1993) Haul-unit performance. Journal of Construction Engineering and Management, 119(3), pp. 646-653. ISSN 0733-9364
Hoffman, S J (1993) Behind the facade: The constraining influence of race, class and power on elites in the city-building process, Richmond, Virginia, 1870-1920. PhD thesis, Carnegie Mellon University, USA.
Hornaday, W C; Haas, C T; O’Connor, J T and Wen, J (1993) Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management, 119(3), pp. 498-515. ISSN 0733-9364
Howell, G; Laufer, A and Ballard, G (1993) Interaction between subcycles: One key to improved methods. Journal of Construction Engineering and Management, 119(4), pp. 714-728. ISSN 0733-9364
Hsieh, T-Y (1993) Functional requirements for large-scale manipulators in industrial construction. PhD thesis, University of Texas at Austin, USA.
Hussain, M B (1993) Constraint-based construction project scheduling. PhD thesis, Carnegie Mellon University, USA.
Ioannou, P. G. and Liu, L. Y. (1993) Advanced construction technology system: Acts. Journal of Construction Engineering and Management, 119(2), pp. 288-306. ISSN 0733-9364
Ioannou, P G and Leu, S S (1993) Average-bid method: competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147. ISSN 0733-9364
Ioannou, P G and Liu, L Y (1993) Advanced construction technology system: acts. Journal of Construction Engineering and Management, 119(2), pp. 288-306. ISSN 0733-9364
Jaskot, P B (1993) The architectural policy of the SS, 1936-1945. PhD thesis, Northwestern University, USA.
Jeljeli, M N; Russell, J S; Guy Meyer, H W and Vonderohe, A P (1993) Potential applications of geographic information systems to construction industry. Journal of Construction Engineering and Management, 119(1), pp. 72-86. ISSN 0733-9364
Jensen Jr., D A (1993) Liquidated damages clauses in construction contracts: A study of the application preference of the three-prong test by the appellate court system. PhD thesis, Texas A&M University, USA.
Jergeas, G F and Revay, S O (1993) Quantifying construction claims using the differential cost method. Construction Management and Economics, 11(2), pp. 163-166. ISSN 01446193
Johnson, K D and Tatum, C B (1993) Technology in marine construction firms. Journal of Construction Engineering and Management, 119(1), pp. 148-162. ISSN 0733-9364
Jung, S-K (1993) A study of single-family residential construction activity: Simultaneous transfer function (STF) analysis. PhD thesis, Georgia State University, USA.
Kabbani, I A (1993) Decision support life cycle analysis system in building design. PhD thesis, University of Colorado at Boulder, USA.
Kaka, A P and Price, A D F (1993) Modelling standard cost commitment curves for contractors' cash flow forecasting. Construction Management and Economics, 11(4), pp. 271-283. ISSN 01446193
Kaplinski, O (1993) Diminishing non-uniformity of construction processes. Construction Management and Economics, 11(1), pp. 53-61. ISSN 01446193
Kennington, J (1993) Development of an integrated HVAC design environment. PhD thesis, University College, Galway, Ireland.
Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kodikara, G W and McCaffer, R (1993) Flow of estimating data in Sri Lankan building contractor organizations. Construction Management and Economics, 11(5), pp. 341-346. ISSN 01446193
Kodikara, G W; Thorpe, A and McCaffer, R (1993) The use of bills of quantities in building contractor organizations. Construction Management and Economics, 11(4), pp. 261-269. ISSN 01446193
Koo, T K and Tiong, R (1993) An expert system for assessing the performance of RC beams and slabs. Construction Management and Economics, 11(5), pp. 347-357. ISSN 01446193
Korczynski, M (1993) Capital, labour and economic performance in the engineering construction industry: 1960-1990. PhD thesis, University of Warwick, UK.
Kumar, V S S (1993) Application of fuzzy set theory in construction management. PhD thesis, Indian Institute of Technology Delhi, India.
Kähkönen, K E E (1993) Modelling activity dependencies for building construction project scheduling. PhD thesis, University of Reading, UK.
Langford, D; Iyagba, R and Komba, D M (1993) Prediction of solvency in construction companies. Construction Management and Economics, 11(5), pp. 317-325. ISSN 01446193
Laufer, A; Shapira, A; Cohenca-Zall, D and Howell, G A (1993) Prebid and preconstruction planning process. Journal of Construction Engineering and Management, 119(3), pp. 426-444. ISSN 0733-9364
Lopez de Ortigosa, D A (1993) Forecasting construction costs in hyper-inflated economies. PhD thesis, University of Texas at Austin, USA.
Lowe, J (1993) Construction productivity: an input-output approach. PhD thesis, Glasgow Caledonian University, UK.
Lutz, J D and Hijazi, A (1993) Planning repetitive construction: Current practice. Construction Management and Economics, 11(2), pp. 99-110. ISSN 01446193
Macpherson, S J; Kelly, J R and Webb, R S (1993) How designs develop: Insights from case studies in building engineering services. Construction Management and Economics, 11(6), pp. 475-485. ISSN 01446193
Mallon, J C and Mulligan, D E (1993) Quality function deployment: a system for meeting customers' needs. Journal of Construction Engineering and Management, 119(3), pp. 516-531. ISSN 0733-9364
McCahan, R D (1993) School superintendents' perceptions of the planning and construction of a school facility. DEd thesis, Pennsylvania State University, USA.
McCahill, D F and Bernold, L E (1993) Resource-oriented modeling and simulation in construction. Journal of Construction Engineering and Management, 119(3), pp. 590-606. ISSN 0733-9364
McCulloueh, B G and Gunn, P (1993) Construction field data acquisition with pen-based computers. Journal of Construction Engineering and Management, 119(2), pp. 374-384. ISSN 0733-9364
Miskawi, Z (1993) A numerical analysis method for computing schedule and resource forecasting for industrial projects. Construction Management and Economics, 11(6), pp. 411-420. ISSN 01446193
Miyatake, Y and Kangari, R (1993) Experiencing computer integrated construction. Journal of Construction Engineering and Management, 119(2), pp. 307-322. ISSN 0733-9364
Moore, B C (1993) Modeling risk of lunar construction activities: A technology assessment approach. PhD thesis, Georgia Institute of Technology, USA.
Moselhi, O and Deb, B (1993) Project selection considering risk. Construction Management and Economics, 11(1), pp. 45-52. ISSN 01446193
Moselhi, O and Ei-Rayes, K (1993) Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, 119(4), pp. 681-697. ISSN 0733-9364
Moselhi, O; Hegazy, T and Fazio, P (1993) DBID: Analogy-based dss for bidding in construction. Journal of Construction Engineering and Management, 119(3), pp. 466-479. ISSN 0733-9364
Moselhi, O and Lorterapong, P (1993) Near optimal solution for resource-constrained scheduling problems. Construction Management and Economics, 11(4), pp. 293-303. ISSN 01446193
Murtaza, M B (1993) A decision support model integrating neural networks and an expert system for construction modularization. PhD thesis, University of Houston, USA.
Murtaza, M B; Fisher, D J and Skibniewski, M J (1993) Knowledge-based approach to modular construction decision support. Journal of Construction Engineering and Management, 119(1), pp. 115-130. ISSN 0733-9364
Najafi, M (1993) Evaluation of a new microtunneling propulsion system. DEng thesis, Louisiana Tech University, USA.
Namo, F and Fellows, R F (1993) The role of advertising in marketing civil/structural engineering consultancy firms. Construction Management and Economics, 11(6), pp. 431-441. ISSN 01446193
Navon, R and Arkin, H (1993) Economic comparison of an air-conditioner and a desert cooler for residences in arid areas. Construction Management and Economics, 11(1), pp. 62-70. ISSN 01446193
Navon, R; Kelly, P W and Johnston, D W (1993) Human factors in introducing on-site construction automation. Journal of Construction Engineering and Management, 119(4), pp. 801-812. ISSN 0733-9364
Niskanen, T (1993) Accident risks and preventive measures in materials handling at construction sites. DrTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
O'Brien, M J and Pantouvakis, J P (1993) A new approach to the development of computer- aided estimating systems for the construction industry. Construction Management and Economics, 11(1), pp. 30-44. ISSN 01446193
Ofori, G (1993) Research on construction industry development at the crossroads. Construction Management and Economics, 11(3), pp. 175-185. ISSN 01446193
Ohura, T and Kato, M (1993) Erection and field test of concrete arch bridge applying composite tube. Journal of Construction Engineering and Management, 119(4), pp. 666-680. ISSN 0733-9364
O’Brien, M J and Al-Soufi, A (1993) Electronic data interchange and the structure of the UK construction industry. Construction Management and Economics, 11(6), pp. 443-453. ISSN 01446193
O’connor, J T and Caraway, P H (1993) Need for specification format that accommodates engineered projects. Journal of Construction Engineering and Management, 119(4), pp. 757-768. ISSN 0733-9364
Paek, J H; Lee, Y W and Ock, J H (1993) Pricing construction risk: Fuzzy set application. Journal of Construction Engineering and Management, 119(4), pp. 743-756. ISSN 0733-9364
Panzeter, A A (1993) A methodology for modeling the cost and duration of concrete highway bridges. PhD thesis, Purdue University, USA.
Parfitt, M K; Syal, M G; Khalvati, M and Bhatia, S (1993) Computer-integrated design drawings and construction project plans. Journal of Construction Engineering and Management, 119(4), pp. 729-742. ISSN 0733-9364
Park, Y C (1993) Korea's overseas construction work and its impact on the Korean economy 1965-1984. PhD thesis, University of Hull, UK.
Patty, R M (1993) A construction engineering platform for the integration of constructability concepts and lessons learned at the point of design. PhD thesis, Purdue University, USA.
Pau, S H; Chau, K W and Wong, W G (1993) Prospects for no-dig technology in Hong Kong construction industry. Journal of Construction Engineering and Management, 119(3), pp. 550-559. ISSN 0733-9364
Phan, D H D (1993) The primitive-composite (p-c) approach: A methodology for developing sharable object-oriented data representations for facility engineering integration. PhD thesis, Stanford University, USA.
Pheng, L S (1993) The rationalization of quality in the construction industry: Some empirical findings. Construction Management and Economics, 11(4), pp. 247-259. ISSN 01446193
Preece, C N (1993) A study of the management of promotion for competitive advantage in UK construction firms. PhD thesis, Heriot-Watt University, UK.
Radtke, M W and Russell, J S (1993) Project-level model process for implementing constructability. Journal of Construction Engineering and Management, 119(4), pp. 813-831. ISSN 0733-9364
Rahman, H A (1993) The management and cost of quality for civil engineering projects. PhD thesis, University of Manchester, UK.
Ranasinghe, M and Russell, A D (1993) Elicitation of subjective probabilities for economic risk analysis: An investigation. Construction Management and Economics, 11(5), pp. 326-340. ISSN 01446193
Rich, Jeffrey R (1993) Victorian building workers and unions 1856-90. PhD thesis, Australian National University, Australia.
Rosenfeld, Y and Warszawski, A (1993) Forecasting methodology of national demand for construction labour. Construction Management and Economics, 11(1), pp. 18-29. ISSN 01446193
Rowlinson, S; Ho, T K K and Po-Hung, Y (1993) Leadership style of construction managers in Hong Kong. Construction Management and Economics, 11(6), pp. 455-465. ISSN 01446193
Russell, A D (1993) Computerized daily site reporting. Journal of Construction Engineering and Management, 119(2), pp. 385-402. ISSN 0733-9364
Russell, A D and Wong, W C M (1993) New generation of planning structures. Journal of Construction Engineering and Management, 119(2), pp. 196-214. ISSN 0733-9364
Russell, J S and Gugel, J G (1993) Comparison of two corporate constructability programs. Journal of Construction Engineering and Management, 119(4), pp. 769-784. ISSN 0733-9364
Sadri, S L (1993) An integrated information system for building construction projects. PhD thesis, Georgia Institute of Technology, USA.
Salim, M (1993) Process-oriented planning for the placement of reinforcing bars. PhD thesis, North Carolina State University, USA.
Sanders, S R and Thomas, H R (1993) Masonry productivity forecasting model. Journal of Construction Engineering and Management, 119(1), pp. 163-179. ISSN 0733-9364
Sawacha, E O-O (1993) An investigation into safety attitudes and safety performance in the construction industry. PhD thesis, Brunel University, UK.
Scott, S (1993) The nature and effects of construction delays. Construction Management and Economics, 11(5), pp. 358-369. ISSN 01446193
Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.
Severson, G D; Jaselskis, E J and Russell, J S (1993) Trends in construction contractor financial data. Journal of Construction Engineering and Management, 119(4), pp. 854-858. ISSN 0733-9364
Shah, D D; Jain, S K and Prybella, R W (1993) Performance of remotely controlled fiberglass pipe jacking system. Journal of Construction Engineering and Management, 119(4), pp. 832-851. ISSN 0733-9364
Shash, A A (1993) Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11(2), pp. 111-118. ISSN 01446193
Shash, A A and Abdul-Hadi, N H (1993) The effect of contractor size on mark-up size decision in Saudi Arabia. Construction Management and Economics, 11(6), pp. 421-429. ISSN 01446193
Shen, Q (1993) A knowledge based structure for implementing Value Management in the design of office buildings. PhD thesis, University of Salford, UK.
Slaughter, E S (1993) Builders as sources of construction innovation. Journal of Construction Engineering and Management, 119(3), pp. 532-549. ISSN 0733-9364
Soemardi, B W (1993) Fuzzy neural network models for design/construction processes. PhD thesis, University of Kentucky, USA.
Sommerville, J (1993) Recruitment sources and employee turnover in sectors of the construction industry. PhD thesis, Heriot-Watt University, UK.
Sommerville, J; Kennedy, P and Orr, L (1993) Women in the UK construction industry. Construction Management and Economics, 11(4), pp. 285-291. ISSN 01446193
Stewart, M G (1993) Modeling human performance in reinforced concrete beam construction. Journal of Construction Engineering and Management, 119(1), pp. 6-22. ISSN 0733-9364
Suazo, G A R and Jaselskis, E J (1993) Comparison of construction safety codes in United States and Honduras. Journal of Construction Engineering and Management, 119(3), pp. 560-572. ISSN 0733-9364
Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.
Sun, M (1993) Technology transfer, architectural design and integrated building design systems. PhD thesis, University of Newcastle upon Tyne, UK.
Tallant, D J (1993) Privatization in a developing economy: Lessons from the Turkish cement industry. PhD thesis, Cornell University, USA.
Tan, R R and Chang, D S (1993) The formulation of performance indicators in evaluating the implementation of automation in the construction industry. Construction Management and Economics, 11(5), pp. 398-403. ISSN 01446193
Tavakoli, A and Kakalia, A (1993) MMS: A materials management system. Construction Management and Economics, 11(2), pp. 143-148. ISSN 01446193
Teixeira, J M (1993) Contractors management functions: an integrated approach for planning, estimating and control. PhD thesis, Loughborough University, UK.
Tipple, C (1993) An analysis of the development of the construction industry since the 18th century. PhD thesis, University of Manchester, UK.
Tommelein, I D and Zouein, P P (1993) Interactive dynamic layout planning. Journal of Construction Engineering and Management, 119(2), pp. 266-287. ISSN 0733-9364
Touran, A (1993) Probabilistic cost estimating with subjective correlations. Journal of Construction Engineering and Management, 119(1), pp. 58-71. ISSN 0733-9364
Vanegas, J A; Bravo, E B and Halpin, D W (1993) Simulation technologies for planning heavy construction processes. Journal of Construction Engineering and Management, 119(2), pp. 336-354. ISSN 0733-9364
Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.
Wall, D M (1993) Building maintenance in the context of developing countries. Construction Management and Economics, 11(3), pp. 186-193. ISSN 01446193
Wee, S (1993) A prototype of an expert system for pavement maintenance and rehabilitation strategy in the state of Ohio (espresso). PhD thesis, Ohio State University, USA.
Wells, J (1993) Appropriate building technologies: An appraisal based on case studies of building projects in Senegal and Kenya. Construction Management and Economics, 11(3), pp. 203-216. ISSN 01446193
Werna, E (1993) The concomitant evolution and stagnation of the Brazilian building industry. Construction Management and Economics, 11(3), pp. 194-202. ISSN 01446193
Wikstrom, M R (1993) Four papers on wage formation in a unionized economy. PhD thesis, Umea Universitet, Sweden.
Wilkinson, S (1993) Entry to employment: Choices made by qualified women civil engineers leaving higher education. PhD thesis, Oxford Brookes University, UK.
Winch, G and Schneider, E (1993) The strategic management of architectural practice. Construction Management and Economics, 11(6), pp. 467-473. ISSN 01446193
Wong, K D (1993) An integrated information system for Hong Kong construction contractors. PhD thesis, Loughborough University, UK.
Yates, J K (1993) Construction decision support system for delay analysis. Journal of Construction Engineering and Management, 119(2), pp. 226-244. ISSN 0733-9364
Up a level