Items with Topic: Time Control
Aalami, F B (1998) Using construction method models to generate four-dimensional production models. PhD thesis, Stanford University, USA.
Abadi, Ayda (2014) A study of innovation perception within the construction industry. PhD thesis, University of Manchester, UK.
Abadou, Y; Kettab, R and Ghreib, A (2018) Experimental investigation on the carbonation properties of dune sand ceramic waste mortar. Journal of Engineering, Design and Technology, 16(3), pp. 501-516. ISSN 1726-0531
Abanomi, W M (2005) Environmental design of prototype school buildings in hot, arid regions with special reference to Riyadh, Saudi Arabia. PhD thesis, Cardiff University, UK.
Abarinda, J; Kibwami, N and Tutesigensi, A (2019) Towards improving schedule performance of construction projects in Uganda with lean construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Abbas, M A; Ajayi, S O; Oyegoke, A S and Alaka, H (2024) A cloud-based collaborative ecosystem for the automation of BIM execution plan (BEP). Journal of Engineering, Design and Technology, 22(4), pp. 1306-1324. ISSN 1726-0531
Abbasi, Mostafa (2017) Enhance the construction industry performance through lean applications. PhD thesis, Politecnico di Milano, Italy.
Abbasi, S; Taghizade, K and Noorzai, E (2020) BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints. Journal of Construction Engineering and Management, 146(12): 04020143, ISSN 0733-9364
Abd Al-Jalil, Y Q (1998) Analysis of performance of tunnel boring machine-based systems. PhD thesis, University of Texas at Austin, USA.
Abd El-Razek, M E; Bassioni, H A and Mobarak, A M (2008) Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management, 134(11), pp. 831-841. ISSN 0733-9364
AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.
Abdalall, S (2017) Concurrent delay analysis in public works construction disputes: a cross-jurisdictional study of Egypt, Scotland and England. PhD thesis, University of Strathclyde, UK.
Abdallah, A M (2021) A study on bridge inspections: Identifying barriers to new practices and providing strategies for change. PhD thesis, Colorado State University, USA.
Abdel-Hamid, M and Abdelhaleem, H M (2023) Project cost control using five dimensions building information modelling. International Journal of Construction Management, 23(3), pp. 405-409. ISSN 1562-3599
Abdel-Monem, M and Hegazy, T (2013) Enhancing construction as-built documentation using interactive voice response. Journal of Construction Engineering and Management, 139(7), pp. 895-898. ISSN 0733-9364
Abdelalim, A M; Salem, M; Al-Sabah, R; Said, S O; ElShafei, H M and Galal Badawy, M (2025) Optimizing claim management process groups to enhance construction project success. International Journal of Construction Management, 25(13), pp. 1583-1595. ISSN 1562-3599
Abdelazeem, A S and Ibrahim, A H (2022) Evaluation of project cost and schedule performance using fuzzy theory-based polynomial function. International Journal of Construction Management, 22(13), pp. 2564-2576. ISSN 1562-3599
Abdelghafar, A (2024) Identifying challenges, best practices, and potential solutions to NYCSCA project delays. DBA thesis, Touro University Worldwide, USA.
Abdelghani, Mohammad (2021) Towards a generalized value stream mapping and domain ontology to support the enabling of industry 4.0 in construction. PhD thesis, University of Alberta, Canada.
Abdelhadi, Y; Dulaimi, M F and Bajracharya, A (2019) Factors influencing the selection of delay analysis methods in construction projects in UAE. International Journal of Construction Management, 19(4), pp. 329-340. ISSN 1562-3599
Abdelhamid, T S and Everett, J G (1999) Time series analysis for construction productivity experiments. Journal of Construction Engineering and Management, 125(2), pp. 87-95. ISSN 0733-9364
Abdelkhalek, S; Zayed, T and Eltoukhy, A E E (2025) Multifaceted optimization for bridge inspection process. Journal of Construction Engineering and Management, 151(5): 04025034, ISSN 0733-9364
Abdelkhalek, Sherif Ibrahim Farag Mohamed (2022) Managing the inspection process of concrete bridge decks. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599
Abdelmohsen, S M A (2011) An ethnographically informed analysis of design intent communication in BIM-enabled architectural practice. PhD thesis, Georgia Institute of Technology, USA.
Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues. PhD thesis, KTH Royal Institute of Technology, Sweden.
Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects. PhD thesis, Oklahoma State University, USA.
Abduh, M; Sukardi, S N; Wirahadikusumah, R D; Oktaviani, C Z and Bahagia, S N (2023) Maturity of procurement units for public construction projects in Indonesia. International Journal of Construction Management, 23(13), pp. 2171-2184. ISSN 1562-3599
Abdul Majid, M Z (1997) Non-excusable delays in construction. PhD thesis, Loughborough University, UK.
Abdul Nabi, M (2023) Promoting enhanced decision-making and proactive management for modularization in the construction industry using risk-based approach, analytical hierarchy process, and graph theory. PhD thesis, Missouri University of Science and Technology, USA.
Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193
Abdul-Rahman, H; Berawi, M A; Berawi, A R; Mohamed, O; Othman, M and Yahya, I A (2006) Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management, 132(2), pp. 125-133. ISSN 0733-9364
Abdul-Rahman, H; Yahya, I A; Berawi, M A and Wah, L W (2008) Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, 26(1), pp. 15-27. ISSN 1466433X
Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.
Abdulhadi, M A M E (2012) IT adoption in the construction sector in Libya. PhD thesis, University of Glamorgan, UK.
Abdulla, H S (2016) An investigation on the causes and remedial measures on the delays in the construction industry in the Kingdom of Bahrain. PhD thesis, Glasgow Caledonian University, UK.
Abdullah, A M and Vickridge, I G (2000) The extent of multi-project management implementation in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Abdullah Habib, S N H (2017) Critical success factors and contractual risks for Private Finance 2 projects implementing building information modelling. PhD thesis, University of Salford, UK.
Abdul‐Aziz, A R (2003) Construction entrepreneurship in Terengganu, Malaysia: An exploration of the influential forces. Journal of Engineering, Design and Technology, 1(1), pp. 15-41. ISSN 1726-0531
Abeid, J and Arditi, D (2003) Photo-net: An integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(3), pp. 162-171. ISSN 0969-9988
Abeid, J N (2000) Photo-net: An integrated system for controlling the progress of construction activities. PhD thesis, Illinois Institute of Technology, USA.
Abeydeera, W P P (2003) The role of social capital in collaborative governmental and non-governmental programmes on poverty reduction in Sri Lanka. PhD thesis, University of Guelph, Canada.
Abid, M S (1995) Reconstruction for low-income communities in earthquake zones: an investigation for the implementation of community-managed housing reconstruction programmes in low-income countries located in earthquakes zones. PhD thesis, Loughborough University, UK.
Abidin, N Z; Yusof, N and Othman, A A E (2013) Enablers and challenges of a sustainable housing industry in Malaysia. Construction Innovation, 13(1), pp. 10-25. ISSN 1471-4175
Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.
Aboagye, J N; Kissi, E; Acheampong, A and Badu, E (2024) Assessment of competencies to promote best project management practices for road infrastructure projects in Ghana. Journal of Engineering, Design and Technology, 22(2), pp. 438-455. ISSN 1726-0531
Aboagye-Nimo, E; Painting, N and Piroozfar, P (2024) Picking up where we left off: A 'temporary' safety culture. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.
Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988
Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.
Abotaleb, I S and El-Adaway, I H (2018) First attempt toward a holistic understanding of the interdependent rippled impacts associated with out-of-sequence work in construction projects: System dynamics modeling approach. Journal of Construction Engineering and Management, 144(9): 04018084, ISSN 0733-9364
Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity. PhD thesis, University of Wisconsin - Madison, USA.
AbouRizk, S M and Wales, R J (1997) Combined discrete-event/continuous simulation for project planning. Journal of Construction Engineering and Management, 123(1), pp. 11-20. ISSN 0733-9364
Abourizk, S M and Halpin, D W (1992) Statistical properties of construction duration data. Journal of Construction Engineering and Management, 118(3), pp. 525-544. ISSN 0733-9364
Abraham, D M (1990) A state-based framework using indicators for construction monitoring and evaluation. PhD thesis, University of Maryland, College Park, USA.
Abraham, D M and Joanne Yeh, M H (1999) Breakwater construction: An effective method for industrial waste utilization. Engineering, Construction and Architectural Management, 6(2), pp. 145-154. ISSN 0969-9988
Abu Bakar, A H B (2004) Factors affecting technology transfer to indigenous construction companies in developing countries: a Malaysian experience. PhD thesis, University College London, UK.
Abu El-Maaty, A E; El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(5), pp. 809-827. ISSN 0969-9988
Abu Hammad, A A (2003) A decision support system for manufactured housing production process planning and facility layout. PhD thesis, University of Cincinnati, USA.
Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria. PhD thesis, University of California, Berkeley, USA.
Abu-Hijleh, S F and Ibbs, C W (1989) Schedule-based construction incentives. Journal of Construction Engineering and Management, 115(3), pp. 430-443. ISSN 0733-9364
Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.
Abubakar, A (1992) A quantitative approach to cost monitoring and control of construction projects. PhD thesis, Loughborough University, UK.
Abubakar, M; Zailani, B M; Abdullahi, M and Dodo, M (2021) Skills and competencies for survival in the modern construction industry: Students' perspective in Nigeria. African Journal of Built Environment Research, 5(1), pp. 61-76. ISSN 2414-0236
Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364
Abubaker, A E (2010) Improvement of project planning in Libya. PhD thesis, University of Newcastle upon Tyne, UK.
Abubaker, A E; Greenwood, D and Osborne, A (2008) A study of project planning on Libyan construction projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Abubakri, S; Mangat, P S; Grigoriadis, K and Starinieri, V (2025) Pore properties and moisture loss of repair mortars under low-impact microwave curing. International Journal of Building Pathology and Adaptation, 43(4), pp. 749-765. ISSN 2398-4708
Abudayyeh, O; Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of trends in construction research: 1985-2002. Journal of Construction Engineering and Management, 130(3), pp. 433-439. ISSN 0733-9364
Abudayyeh, O Y (1991) An automated data acquisition and data storage model for improving cost and schedule control. PhD thesis, North Carolina State University, USA.
Abudayyeh, O Y and Rasdorf, W J (1991) Design of construction industry information management systems. Journal of Construction Engineering and Management, 117(4), pp. 698-715. ISSN 0733-9364
Abujnah, M S (2010) Towards a risk management framework for Libyan house-building projects. PhD thesis, University of Salford, UK.
Abukhder, J S A (2004) A study of the management process on construction projects, and the development of a new notation system. PhD thesis, University of Dundee, UK.
Abusalem, O (2020) Towards last planner system implementation in Gaza Strip, Palestine. International Journal of Construction Management, 20(5), pp. 367-384. ISSN 1562-3599
Abuwarda, Z and Hegazy, T (2016) Flexible activity relations to support optimum schedule acceleration. Journal of Construction Engineering and Management, 142(11): 06016004, ISSN 0733-9364
Acheng, P O; Kibwami, N; Mukasa, T J; Odongkara, B B; Birungi, R; Semanda, J and Manga, M (2023) Building information modelling adoption in uganda's construction industry. International Journal of Construction Management, 23(13), pp. 2185-2208. ISSN 1562-3599
Acre, F and Wyckmans, A (2015) The impact of dwelling renovation on spatial quality: The case of the Arlequin neighbourhood in Grenoble, France. Smart and Sustainable Built Environment, 4(3), pp. 268-309. ISSN 2046-6099
Adafin, J; Wilkinson, S; Rotimi, J O B; MacGregor, C; Tookey, J and Potangaroa, R (2022) Creating a case for innovation acceleration in the New Zealand building industry. Construction Innovation, 22(1), pp. 185-204. ISSN 1471-4175
Adah, C A; Daniel, E I and Tunji-Olayeni, P (2025) The experience of women in construction craftspeople apprenticeship programmes in Nigeria. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 83-93. ISSN 17514304
Adam, A (2019) Exploring construction challenges of the public client: A dynamic capabilities approach. PhD thesis, Chalmers University of Technology, Sweden.
Adam, A; Josephson, P-E B and Lindahl, G (2017) Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction and Architectural Management, 24(3), pp. 393-406. ISSN 0969-9988
Adams, F K (2004) The management of risks in international infrastructural projects. PhD thesis, University of Edinburgh, UK.
Adams, O (1997) Contractor development in Nigeria: Perceptions of contractors and professionals. Construction Management and Economics, 15(1), pp. 95-108. ISSN 01446193
Adams, Olugboyega A (1993) Management training needs of Nigerian indigenous contractors and their preferred training delivery systems. PhD thesis, University College London, UK.
Adamtey, S (2021) Cost and time performance analysis of progressive design-build projects. Journal of Engineering, Design and Technology, 19(3), pp. 686-697. ISSN 1726-0531
Adamtey, S and Kereri, J O (2023) Risk management in residential projects in the United States: Implementation status, evaluation techniques and barriers. Journal of Engineering, Design and Technology, 21(5), pp. 1481-1500. ISSN 1726-0531
Adamtey, S A (2021) A case study performance analysis of design-build and integrated project delivery methods. International Journal of Construction Education and Research, 17(1), pp. 68-84. ISSN 1557-8771
Adamtey, S A (2022) An empirical study to assist owners in selecting the right procurement method for design-build projects. International Journal of Construction Education and Research, 18(1), pp. 67-84. ISSN 1557-8771
Addy, M. N.; Addo, E. T.; Abdulai, S. F.; Kwofie, T. E.; Aigbavboa, C. O. and Adade-Boateng, A. O. (2026) E-procurement acceptance in the Ghanaian public sector: An application of an extended technology acceptance model (TAM) in the construction industry. Journal of Engineering, Design and Technology, 24(2), pp. 494-515. ISSN 1726-0531
Addy, M N; Addo, E T; Kwofie, T E and Yartey, J E (2023) Predicting the adoption of e-procurement in construction project delivery in Sub-Saharan Africa: An application of utaut2. Construction Innovation, 23(5), pp. 1038-1053. ISSN 1471-4175
Adebayo, A K; Price, A D F and Gibb, A G F (2006) Impact of modern methods of construction on healthcare infrastructure. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Adebayo, S O (1991) A study of the maintenance management of public buildings in Nigeria. PhD thesis, University of Lagos, Nigeria.
Adebisi, E O; Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(2), pp. 210-231. ISSN 23984708
Adediran, A (2018) Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa. PhD thesis, University of Cape Town, South Africa.
Adegoke, A.; Akanmu, A. and Terreno, S. (2026) Aligning visual data practices with construction decision making: Delphi-based investigation. Journal of Construction Engineering and Management, 152(8): 04026119, ISSN 0733-9364
Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364
Adenuga, O A (2008) Evaluation of maintenance management practice in public hospital, buildings in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.
Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2025) An analytical approach to understanding construction cost overruns during COVID-19. Smart and Sustainable Built Environment, 14(6), pp. 1780-1794. ISSN 2046-6099
Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2026) Predicting construction schedule overruns during COVID-19 using ordinal logistic regression. International Journal of Building Pathology and Adaptation, 44(1), pp. 110-125. ISSN 2398-4708
Adepu, N (2023) Analysis of the impact of COVID-19 on construction cost and schedule overruns. PhD thesis, University of Texas at Arlington, USA.
Adesi, M; Murphy, R and Kehily, D (2018) The role of digitisation in the strategic planning process of Irish quantity surveying practices. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Adesi, M; Owusu-Manu, D G and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(3), pp. 458-474. ISSN 0969-9988
Adesina, Adebola (2025) Examining influential factors on the success of project management in education: A content analysis. EdD thesis, University of Nevada, Reno, USA.
Adibfar, A and Costin, A M (2022) Creation of a mock-up bridge digital twin by fusing intelligent transportation systems (ITS) data into bridge information model (brim). Journal of Construction Engineering and Management, 148(9): 04022094, ISSN 0733-9364
Adigbo, F A (2020) Stakeholder engagement and construction project performance in Ghana. PhD thesis, Northcentral University, USA.
Adio, Obafemi Adekunle (2022) An automated knowledge-based decision support system for managing non-conformances on australia's large infrastructure projects. PhD thesis, University of Melbourne, Australia.
Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects. PhD thesis, University of Strathclyde, UK.
Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects. PhD thesis, George Washington University, USA.
Adu, E T and Opawole, A (2020) Assessment of performance of teamwork in construction projects delivery in South-Southern Nigeria. Journal of Engineering, Design and Technology, 18(1), pp. 230-250. ISSN 1726-0531
Adukpo, S E and Leiringer, R (2016) Client project governance capabilities: Unpacking the concept and governance mechanisms in practice. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Adul-Hamid, R (1996) Construction duration prediction using neural network methodology. PhD thesis, University of Manchester, UK.
Aduwo, E B; Ibem, E O; Afolabi, A O; Oluwnmi, A O; Tunji-Olayeni, P F; Ayo-Vaughan, E A; Uwakonye, U O and Oni, A A (2020) Exploring anti-corruption capabilities of e-procurement in construction project delivery in Nigeria. Construction Economics and Building, 20(1), pp. 56-76. ISSN 2204-9029
Afetornu, C and Edum-Fotwe, F T (2005) Characterising project contingency budget in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Afetornu, C; Edum-Fotwe, F T and McCaffer, R (2006) Estimating budget variability for road projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Afolabi, A; Oyeyipo, O; Ojelabi, R and Patience, T O (2019) Balancing the female identity in the construction industry. Journal of Construction in Developing Countries, 24(2), pp. 83-104. ISSN 1823-6499
Afolabi, A O; Oluwatayo, A; Oyeyipo, O; Ojelabi, R and Fagbenle, O (2018) Assessment of designers' perception of post conflict housing schemes for internally displaced persons. Construction Economics and Building, 18(1), pp. 27-47. ISSN 2204-9029
Afshar, M R; Shahhosseini, V and Sebt, M H (2022) A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(3), pp. 357-365. ISSN 1562-3599
Aftab, U; Hassan, M U; Ullah, F; Nasir, A R and Thaheem, M J (2026) BIM-based search and selection of construction material suppliers: A dedicated framework and prototype. Construction Innovation, 26(3), pp. 892-915. ISSN 1471-4175
Afzal, Muneeb (2024) Improving request for information (RFI) processing in construction projects using natural language processing (NLP) techniques. PhD thesis, University of Technology Sydney, Australia.
Agapiou, A (1996) Forecasting the supply of construction labour. PhD thesis, Loughborough University, UK.
Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193
Agapiou, A; Price, A D F and McCaffer, R (1995) Planning future construction skill requirements: Understanding labour resource issues. Construction Management and Economics, 13(2), pp. 149-161. ISSN 01446193
Agbaxode, P D K (2022) A framework to improve design documentation quality using integrated project delivery (IPD) approach. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Agbaxode, P D K; Saghatforoush, E and Dlamini, S (2020) Integrated project delivery (IPD): Projecting a common good to key participants and the project. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Agbo, E A; Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), pp. 109-125. ISSN 1823-6499
Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects. PhD thesis, Northumbria University, UK.
Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364
Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193
Aghimien, D O; Ikuabe, M; Aigbavboa, C; Oke, A and Shirinda, W (2021) Unravelling the factors influencing construction organisations' intention to adopt big data analytics in South Africa. Construction Economics and Building, 21(3), pp. 262-281. ISSN 2204-9029
Agri, M. E.; Le, A. and Phung, Q. (2026) AI integration in architectural design and management: Professionals' perspectives. Architectural Engineering and Design Management, 22(1), pp. 67-82. ISSN 1745-2007
Aguocha, T (2023) Best practices for cost monitoring and control in construction projects: An exploratory case study. DBA thesis, National University, USA.
Agyekum, K; Botchway, S Y; Adinyira, E and Opoku, A (2022) Environmental performance indicators for assessing sustainability of projects in the Ghanaian construction industry. Smart and Sustainable Built Environment, 11(4), pp. 918-950. ISSN 2046-6099
Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects. PhD thesis, Nottingham Trent University, UK.
Agyekum-Mensah, G and Knight, A D (2017) The professionals' perspective on the causes of project delay in the construction industry. Engineering, Construction and Architectural Management, 24(5), pp. 828-841. ISSN 0969-9988
Ahadzi, M and Bowles, G (2004) Public-private partnerships and contract negotiations: An empirical study. Construction Management and Economics, 22(9), pp. 967-978. ISSN 01446193
Ahadzi, M K (2004) Public private partnerships in infrastructure procurement: A generic multi-attribute hierarchical model for minimising pre-contract time and cost overruns (GMAHM). PhD thesis, Heriot-Watt University, UK.
Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.
Ahadzie, D K; Proverbs, D G and Olomolaiye, P (2006) Development of research instrument for project managers' performance measures in mass house building projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Ahadzie, D K; Proverbs, D G and Olomolaiye, P O (2008) Model for predicting the performance of project managers at the construction phase of mass house building projects. Journal of Construction Engineering and Management, 134(8), pp. 618-629. ISSN 0733-9364
Ahaotu, S M (2018) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.
Ahaotu, Sylvia M (2019) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.
Ahiaga-Dagbui, D and Smith, S D (2012) Neural networks for modelling the final target cost of water projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ahiaga-Dagbui, D; Smith, S D; Love, P E D and Ackermann, F (2015) Spotlight on construction cost overrun research: Superficial, replicative and stagnated. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.
Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193
Ahiaga-Dagbui, D D and Smith, S D (2014) Exploring escalation of commitment in construction project management: Case study of the scottish parliament project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ahiaga-Dagbui, D D; Tokede, O; Morrison, J and Chirnside, A (2020) Building high-performing and integrated project teams. Engineering, Construction and Architectural Management, 27(10), pp. 3341-3361. ISSN 0969-9988
Ahiaga-Dagbui D D, S S D (2013) My cost runneth over: Data mining to reduce construction cost overruns. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.
Ahluwalia, S S (2009) A framework for efficient condition assessment of the building infrastructure. PhD thesis, University of Waterloo, Canada.
Ahmad, H S; Ayoush, M D and Al-Alwan, M S (2020) Causes of delay to public infrastructure projects according to engineers representing different contract parties. Built Environment Project and Asset Management, 10(1), pp. 153-179. ISSN 2044-124X
Ahmadian, F F A; Akbarnezhad, A; Rashidi, T H and Waller, S T (2016) Accounting for transport times in planning off-site shipment of construction materials. Journal of Construction Engineering and Management, 142(1): 04015050, ISSN 0733-9364
Ahmadian Fard Fini, A; Rashidi, T H; Akbarnezhad, A and Travis Waller, S (2016) Incorporating multiskilling and learning in the optimization of crew composition. Journal of Construction Engineering and Management, 142(5): 04015106, ISSN 0733-9364
Ahmadian Fard Fini, Alireza (2017) Optimizing crew performance through integration of human resource strategies into planning of construction activities. PhD thesis, University of New South Wales, Australia.
Ahmadu, H A; Ibrahim, A D; Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(9), pp. 2199-2219. ISSN 0969-9988
Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387
Ahmed, I and McEvoy, D (2014) Post-tsunami resettlement in Sri Lanka and India: Site planning, infrastructure and services. International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 53-65. ISSN 1759-5916
Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects. PhD thesis, University of Florida, USA.
Ahmed, S; Haq, I and Anam, S M A (2024) Impacts of COVID-19 on the construction sector in the least developed countries. International Journal of Building Pathology and Adaptation, 42(6), pp. 1085-1105. ISSN 2398-4708
Ahmed, S; Mahmud, A; Akoh, S and Tariq, U (2024) Exploring IPD as an antidote to fragmentation within the UK construction sector. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Ahmed, S M; Sang, L P and Torbica, Ž M (2003) Use of quality function deployment in civil engineering capital project planning. Journal of Construction Engineering and Management, 129(4), pp. 358-368. ISSN 0733-9364
Ahmed, S M; Yaris, C; Farooqui, R U and Saqib, M (2014) Key attributes and skills for curriculum improvement for undergraduate construction management programs. International Journal of Construction Education and Research, 10(4), pp. 240-254. ISSN 1557-8771
Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.
Ahmed, T; Hossain, S M and Hossain, M A (2021) Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling. International Journal of Construction Management, 21(4), pp. 404-415. ISSN 1562-3599
Ahmed, V; Pathmeswaran, R; Baldry, D; Worrall, L and Abouen, S (2008) An investigation into the barriers facing black and minority ethnics within the UK construction industry. Journal of Construction in Developing Countries, 13(2), pp. 83-99. ISSN 1823-6499
Ahmed, Y (2009) The impact of work placements on the development of transferable skills in engineering. PhD thesis, Loughborough University, UK.
Ahmed Memon, Z; Zaimi, M A M and Mustaffar, M (2007) A systematic procedure for developing the 3D model to evaluate the construction project progress. Construction Innovation, 7(2), pp. 187-199. ISSN 1471-4175
Ahn, C R and Lee, S (2013) Importance of operational efficiency to achieve energy efficiency and exhaust emission reduction of construction operations. Journal of Construction Engineering and Management, 139(4), pp. 404-413. ISSN 0733-9364
Ahn, Sang Jun (2019) Transportation framework in panelized construction for residential building. PhD thesis, University of Alberta, Canada.
Ahrari, A (2012) A decision support system for dynamic integrated project scheduling and equipment operation planning. PhD thesis, University of Maryland, College Park, USA.
Ahuja, H N and Arunachalam, V (1984) Risk evaluation in resource allocation. Journal of Construction Engineering and Management, 110(3), pp. 324-336. ISSN 0733-9364
Ahuja, H N and Nandakumar, V (1985) Simulation model to forecast project completion time. Journal of Construction Engineering and Management, 111(4), pp. 325-342. ISSN 0733-9364
Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: Current research status. Construction Innovation, 4(1), pp. 19-31. ISSN 1471-4175
Ahuja, V; Yang, J and Shankar, R (2010) IT-enhanced communication protocols for building project management. Engineering, Construction and Architectural Management, 17(2), pp. 159-179. ISSN 0969-9988
Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(1), pp. 45-54. ISSN 01446193
Aibinu, A A; Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors' perspectives. Construction Management and Economics, 29(5), pp. 463-481. ISSN 1466433X
Aibinu, A A and Odeyinka, H A (2006) Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667-677. ISSN 0733-9364
Aidoo, I; Fugar, F; Adinyira, E and Ansah, N B (2023) Assessing the level of resilience in construction safety management systems in the Ghanaian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 217-242. ISSN 1823-6499
Aigbavboa, C and Thwala, W (2014) An assessment of critical success factors for the reduction of the cost of poor quality from construction projects in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Aiyetan, O A (2019) Influence of the management styles and quality of management on project delivery. Journal of Construction Business and Management, 3(1), pp. 38-44. ISSN 2521-0165
Aiyetan, O A and Dillip, D (2018) System dynamics approach to mitigating skilled labour shortages in the construction industry: A South Africa context. Construction Economics and Building, 18(4), pp. 45-63. ISSN 2204-9029
Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599
Ajayi, S O; Jones, W and Unuigbe, M (2019) Occupational stress management for UK construction professionals: Understanding the causes and strategies for improvement. Journal of Engineering, Design and Technology, 17(4), pp. 819-832. ISSN 1726-0531
Ajayi, S O; Oyebiyi, F and Alaka, H A (2023) Facilitating compliance with BIM ISO 19650 naming convention through automation. Journal of Engineering, Design and Technology, 21(1), pp. 108-129. ISSN 1726-0531
Aje, I (2012) The impact of contractors' prequalification on construction project delivery in Nigeria. Engineering, Construction and Architectural Management, 19(2), pp. 159-172. ISSN 0969-9988
Aje, O I; Ogunsemi, D R and Odusami, K T (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(2), pp. 171-187. ISSN 1366-4387
Aje, O I; Olatunji, O A and Olalusi, O A (2017) Overrun causations under advance payment regimes. Built Environment Project and Asset Management, 7(1), pp. 86-98. ISSN 2044-124X
Ajelabi, I K (2013) Product based project portfolio and information sharing. PhD thesis, University of Reading, UK.
Ajibike, W A; Adeleke, A Q; Mohamad, F; Bamgbade, J A and Moshood, T D (2023) The impacts of social responsibility on the environmental sustainability performance of the Malaysian construction industry. International Journal of Construction Management, 23(5), pp. 780-789. ISSN 1562-3599
Akanmu, A; Anumba, C and Messner, J (2014) Critical review of approaches to integrating virtual models and the physical construction. International Journal of Construction Management, 14(4), pp. 267-282. ISSN 1562-3599
Akanmu, A and Anumba, C J (2015) Cyber-physical systems integration of building information models and the physical construction. Engineering, Construction and Architectural Management, 22(5), pp. 516-535. ISSN 0969-9988
Akar, G (2009) Analysis of activity choice: The role of activity attributes and individual schedules. PhD thesis, University of Maryland, College Park, USA.
Akbiyikli, R and Eaton, D (2004) Risk management in PFI procurement: A holistic approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.
Akhavian, R and Behzadan, A H (2013) Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining. Journal of Construction Engineering and Management, 139(11): 4013021, ISSN 0733-9364
Akhavian, Reza (2015) Data-driven simulation modeling of construction and infrastructure operations using process knowledge discovery. PhD thesis, University of Central Florida, USA.
Akin, F D; Damci, A and Arditi, D (2024) Optimum finance-based scheduling. Journal of Construction Engineering and Management, 150(9): 04024104, ISSN 0733-9364
Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599
Akinci, B; Fischer, M and Kunz, J (2002) Automated generation of work spaces required by construction activities. Journal of Construction Engineering and Management, 128(4), pp. 306-315. ISSN 0733-9364
Akinci, B; Fischer, M; Kunz, J and Levitt, R (2002) Representing work spaces generically in construction method models. Journal of Construction Engineering and Management, 128(4), pp. 296-305. ISSN 0733-9364
Akinci, B H (2000) Automatic generation of work spaces and analysis of time-space conflicts at construction sites. PhD thesis, Stanford University, USA.
Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193
Akintoye, A; Renukappa, S and Lal, H (2012) The abolition of the contracts in writing rule in the 2009 Construction Act: Potential implications for UK adjudication. International Journal of Law in the Built Environment, 4(2), pp. 140-156. ISSN 1756-1450
Akpan, E O P and Igwe, O (2001) Methodology for determining price variation in project execution. Journal of Construction Engineering and Management, 127(5), pp. 367-373. ISSN 0733-9364
Aksenova, G (2020) The dark side of ecosystem orchestration: an empirical investigation of building information management in the digital built environment sector. PhD thesis, University of Liverpool, UK.
Aksorn, T and Hadikusumo, B H W (2008) Measuring effectiveness of safety programmes in the Thai construction industry. Construction Management and Economics, 26(4), pp. 409-421. ISSN 1466433X
Aksözen, M; Hassler, U; Rivallain, M and Kohler, N (2017) Mortality analysis of an urban building stock. Building Research & Information, 45(3), pp. 259-277. ISSN 0961-3218
Akuhe, G; Tutesigensi, A and Kayondo, M (2023) Consequences of poor management of acculturation on large infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Al Asali, M W (2020) Craft-inclusive construction: design strategies for thin-tile vaulting. PhD thesis, University of Cambridge, UK.
Al Awad, O S (2015) The uptake of advanced IT with specific emphasis on BIM by SMEs in the Jordanian construction industry. PhD thesis, University of Salford, UK.
Al Dinah, M (2022) Coordination issues and unethical practices in comparison with other determinants of delays and cost overruns in the construction industry: how do the participants respond? PhD thesis, University of Portsmouth, UK.
Al Haj, R A and El-Sayegh, S M (2015) Time-cost optimization model considering float-consumption impact. Journal of Construction Engineering and Management, 141(5): 04015001, ISSN 0733-9364
Al Hattab, M; Zankoul, E; Barakat, M and Hamzeh, F (2018) Crane overlap and operational flexibility: Balancing utilization, duration, and safety. Construction Innovation, 18(1), pp. 43-63. ISSN 1471-4175
Al Hawsah, M O (2020) The impact of project sponsors' decisions on the success of projects: An action research study. PhD thesis, University of Liverpool, UK.
Al Jashaami, Mohammed Ahmed Mohammed (2021) Improving delay management of construction projects by creating a systematic scoring scale to minimise/avoid delays. PhD thesis, Queensland University of Technology, Australia.
Al Khatib, B A (2021) Determining the delay factors for reconstructed mega-project’s phases and the associated challenges. PhD thesis, University of Malaya, Malaysia.
Al Nahyan, Moza Tahnoon (2012) Management of mega infrastructure projects in the United Arab Emirates. PhD thesis, Monash University, Australia.
Al Nasseri, H and Aulin, R (2016) Enablers and barriers to project planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(2), pp. 1-20. ISSN 1823-6499
Al Nasseri, H and Aulin, R (2016) Understanding management roles and organisational behaviours in planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(1), pp. 1-18. ISSN 1823-6499
Al Nasseri, H A; Widen, K and Aulin, R (2016) A taxonomy of planning and scheduling methods to support their more efficient use in construction project management. Journal of Engineering, Design and Technology, 14(3), pp. 580-601.
Al Sabah, R (2014) Evaluating the impact of construction risks on project success in the Arabian Gulf region (AGR) construction industry from the perspective of multinational firms. PhD thesis, University of Wisconsin - Madison, USA.
Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry. PhD thesis, Heriot-Watt University, UK.
Al Shaiba Khamis Abdulla Al Sheryani, Y (2015) Project management leadership progression: a conceptual framework for Abu Dhabi. PhD thesis, University of Salford, UK.
Al Shamsi, H A A (2015) A framework for group leadership in the construction industry in Abu Dhabi. PhD thesis, University of Wolverhampton, UK.
Al Sheryani, Y A S K A (2015) Project management leadership progression: A conceptual framework for Abu Dhabi. PhD thesis, University of Salford, UK.
Al Subaih, A (2016) A framework for implementation of IPD principles in oil & gas projects. PhD thesis, University of Salford, UK.
Al Taie, Mohsin Shareef (2022) Applications of lean in construction: Benefits from using the Last Planner system. PhD thesis, Liberty University, USA.
Al-Amin, Md (2023) Pavement maintenance and rehabilitation programming and budget allocation from strategic perspectives: Multiobjective optimization models. PhD thesis, University of Texas at Austin, USA.
Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction. PhD thesis, University of Alberta, Canada.
Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.
Al-Fadhali, N; Zainal, R; Kasim, N; Dodo, M; Kim Soon, N and Hasaballah, A H A (2019) The desirability of integrated influential factors (IIFS) model of internal stakeholder as a panacea to project completion delay in Yemen. International Journal of Construction Management, 19(2), pp. 128-136. ISSN 1562-3599
Al-Gahtani, K; Alsugair, A; Alsanabani, N; Alabduljabbar, A and Almutairi, B (2024) Forecasting delay-time model for Saudi construction projects using DEMATEL–sd technique. International Journal of Construction Management, 24(11), pp. 1225-1239. ISSN 1562-3599
Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. PhD thesis, State University of New York at Buffalo, USA.
Al-Gahtani, K S (2009) Float allocation using the total risk approach. Journal of Construction Engineering and Management, 135(2), pp. 88-95. ISSN 0733-9364
Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.
Al-Ghzawi, M and El-Rayes, K (2023) Optimizing the planning of airport airside expansion projects to minimize air traffic disruptions and construction cost. Journal of Construction Engineering and Management, 149(4): 04023013, ISSN 0733-9364
Al-Haddad, S (2020) State transportation agencies: A quantitative study on the use of construction engineering and inspection consultants and their impact on project performance. PhD thesis, University of Colorado at Boulder, USA.
Al-Hammad, I A (1991) A knowledge-based framework for construction methods selection. PhD thesis, University of British Columbia, Canada.
Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman. PhD thesis, Loughborough University, UK.
Al-Hashimy, H. N. H. and Yao, J. (2026) The moderating role of electronic accounting information systems in enhancing efficiency in construction project management. Engineering, Construction and Architectural Management, 33(4), pp. 3308-3331. ISSN 0969-9988
Al-Hashimy, H. N. H.; Yao, J.; Pitchay, A. A. and Hussein, W. N. (2026) Linking computerised accounting information systems to innovation, resilience and performance in construction projects. Engineering, Construction and Architectural Management, pp. 1-21. ISSN 0969-9988
Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.
Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 0969-9988
Al-Joma, M and Mangin, J C (2004) A scheduling model for repetitive activities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Al-Kaisy, A and Nassar, K (2009) Developing a decision support tool for nighttime construction in highway projects. Journal of Construction Engineering and Management, 135(2), pp. 119-125. ISSN 0733-9364
Al-Keim, A (2017) Strategies to reduce cost overruns and schedule delays in construction projects. PhD thesis, Walden University, USA.
Al-Khalil, M I and Al-Ghafly, M A (1999) Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17(5), pp. 647-655. ISSN 01446193
Al-Kharashi, A and Skitmore, M (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(1), pp. 3-23. ISSN 1466433X
Al-Momani, A H (2000) Structuring information on residential building: A model of preference. Engineering, Construction and Architectural Management, 7(2), pp. 179-190. ISSN 0969-9988
Al-Nasser, A A (2001) Optimisation of construction implemented as a manufacturing process. PhD thesis, University of Sussex, UK.
Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.
Al-Rabady, R. (2026) Decolonising time: Vernacular villages and the politics of heritage temporality. Buildings & Cities, 7(1), pp. 740-756. ISSN 2632-6655
Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization. PhD thesis, University of Colorado at Boulder, USA.
Al-Rqaibat, Sana'A Mohammad (2019) A framework for the implementation of digital technologies in the concept stage of the architectural design process. PhD thesis, Virginia Tech, USA.
Al-Saeed, Y; Parn, E; Edwards, D J and Scaysbrook, S (2019) A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production: A case study. Journal of Engineering, Design and Technology, 17(5), pp. 960-984. ISSN 1726-0531
Al-Saggaf, A; Hegazy, T; Nasir, H and Taha, M (2022) Computerized DSS for evaluating design performance of residential buildings using additive weighting approach. Architectural Engineering and Design Management, 18(5), pp. 631-651. ISSN 1745-2007
Al-Sasi, B O (2007) A lean approach to capacity management in construction. PhD thesis, University of Southampton, UK.
Al-Sedairy, S (1984) Large scale projects: management, design and execution. PhD thesis, University of Sheffield, UK.
Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(4), pp. 1136-1157. ISSN 1726-0531
Al-Tabbaa, O and Rustom, R (2011) General framework for designing multi-use simulation modules for estimating project durations. Construction Innovation, 11(3), pp. 321-337. ISSN 1471-4175
Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988
Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.
Al-Werikat, G K E (2017) The impact of supply chain management on construction projects performance in Jordan. PhD thesis, Coventry University, UK.
Al-Yami, A M H (2008) An integrated approach to value management and sustainable construction during strategic briefing in Saudi construction projects. PhD thesis, Loughborough University, UK.
Al-Zahrani, J I (2013) The impact of contractors' attributes on construction project success. PhD thesis, University of Manchester, UK.
Al-Zarooni, S (1997) Developing the construction industry in the United Arab Emirates with special reference to Abu Dhabi. PhD thesis, University of London, University College London, UK.
Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.
AlHamouri, K; Caldas, C H; Hwang, B G; Krishnankutty, P and de Oliveira, D P (2021) Utilization of workface planning for the execution of maintenance activities, shutdowns and turnarounds in petrochemical facilities: A case study. International Journal of Construction Management, 21(11), pp. 1115-1129. ISSN 1562-3599
AlNasseri, H A (2015) Understanding applications of project planning and scheduling in construction projects. PhD thesis, Lund University, Sweden.
AlSaggaf, A and Jrade, A (2023) Arcspat: An integrated building information modeling (BIM) and geographic information system (GIS) model for site layout planning. International Journal of Construction Management, 23(3), pp. 505-527. ISSN 1562-3599
AlSehaimi, A (2011) Improving construction planning practice in Saudi Arabia by means of lean construction principles and techniques. PhD thesis, University of Salford, UK.
Alade, K and Windapo, A O (2021) Developing effective 4IR leadership framework for construction organisations. Engineering, Construction and Architectural Management, 28(5), pp. 1377-1396. ISSN 0969-9988
Alaghbari, W; Al-Sakkaf, A A and Sultan, B (2019) Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1), pp. 79-91. ISSN 1562-3599
Alaghbari, W; Kadir, M R A and Salim, A (2007) The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), pp. 192-206. ISSN 0969-9988
Alajmani, H; Ahmed, S and El-Sayegh, S M (2024) Factors causing delays in the UAE construction industry amid the covid-19 pandemic. Journal of Financial Management of Property and Construction, 29(1), pp. 135-151. ISSN 1366-4387
Alam, M (2009) Investigating the effectiveness of continuing professional development in project management. PhD thesis, University of Manchester, UK.
Alamil, H M (2022) Knowledge sharing within the Kingdom of Saudi Arabia large construction organisations. PhD thesis, University of Wolverhampton, UK.
Alananga, S; Lucian, C and Kusiluka, M M (2015) Significant cost-push factors in owner-built incremental housing construction in Tanzania. Construction Management and Economics, 33(8), pp. 671-688. ISSN 01446193
Alao, O O; Jagboro, G O and Opawole, A (2018) Cost and time implications of abandoned project resuscitation: A case study of educational institutional buildings in Nigeria. Journal of Financial Management of Property and Construction, 23(2), pp. 185-201. ISSN 1366-4387
Alaqad, M (2021) Critical success factors for integration of value, financial risk, and environmental management systems in medium sized design and build projects. PhD thesis, University of Brighton, UK.
Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364
Alarcón-Ramirez, D; Oliveros-Romero, J and Mahn, D (2026) Performance comparison of public–private partnerships and traditionally procured hospitals. Construction Management and Economics, 44(2), pp. 79-97. ISSN 0144-6193
Alashari, M; El-Rayes, K and Alotaibi, M (2023) Optimizing the planning of maintenance activities in education buildings. Journal of Construction Engineering and Management, 149(10): 04023094, ISSN 0733-9364
Alashwal, N and Alashwal, A (2023) Rural access programs in Yemen: Delay of international funded road projects. Engineering, Construction and Architectural Management, 30(4), pp. 1746-1767. ISSN 0969-9988
Alavipour, S M (2017) Project scheduling using optimized financing. PhD thesis, Illinois Institute of Technology, USA.
Alavipour, S M R and Arditi, D (2018) Optimizing financing cost in construction projects with fixed project duration. Journal of Construction Engineering and Management, 144(4): 04018012, ISSN 0733-9364
Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988
Albert, A; Hallowell, M R and Kleiner, B M (2014) Experimental field testing of a real-time construction hazard identification and transmission technique. Construction Management and Economics, 32(10), pp. 1000-1016. ISSN 01446193
Albert, A; Jeelani, I and Han, K (2020) Developing hazard recognition skill among the next-generation of construction professionals. Construction Management and Economics, 38(11), pp. 1024-1039. ISSN 01446193
Albert, I (2020) A lean production approach to materials management in the Nigerian construction industry. PhD thesis, Nelson Mandela University, South Africa.
Albogamy, A and Dawood, N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA. Engineering, Construction and Architectural Management, 22(5), pp. 493-515. ISSN 0969-9988
Albouwarthan, M A (2020) Prolonged heat exposure and health outcomes among construction workers in Saudi Arabia. DSc thesis, University of Massachusetts Lowell, USA.
Aleithawe, I (2010) Acquisition of right of way for highway construction. PhD thesis, Mississippi State University, USA.
Aleithawe, I; Sinno, R R and McAnally, W H (2012) Right-of-way acquisition duration prediction model for highway construction projects. Journal of Construction Engineering and Management, 138(4), pp. 540-544. ISSN 0733-9364
Alemu, S K (2022) Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(5), pp. 2183-2206. ISSN 0969-9988
Alenazi, E O N (2018) Using BIM for delay management in public sector construction projects in KSA. PhD thesis, Loughborough University, UK.
Alfeld, L E (1990) Construction delays: A simulation analysis. DSc thesis, Washington University in St. Louis, USA.
Alghamdi, A M (2022) A systemic approach for construction contract claims settlement in the Kingdom of Saudi Arabia. PhD thesis, University of Reading, UK.
Alhabashi, M H (1991) Material management in the United States construction industry. DSc thesis, George Washington University, USA.
Alhadidi, Suleiman (2023) Real-time architecture: Quantifying the spatial performance of workplaces. DDes thesis, Harvard University, USA.
Alhalafi, M (2021) Develop a lean project management framework for the construction companies in order to improve the time and cost efficiencies of their construction operations. PhD thesis, De Montfort University, UK.
Alharbi, F (2020) Critical delay factors in housing construction projects in Saudi Arabia: Assessment and solutions. PhD thesis, Nottingham Trent University, UK.
Alhawamdeh, M (2020) An interpretivist approach for the development of a behavioural framework to support the adoption of waste minimisation behaviour of contractors: the case study of Jordan. PhD thesis, University of Salford, UK.
Ali, A H; Kineber, A F; Elyamany, A; Hussein Ibrahim, A and Daoud, A O (2025) Exploring stationary and major modular construction challenges in developing countries: A case study of Egypt. Journal of Engineering, Design and Technology, 23(2), pp. 569-598. ISSN 1726-0531
Ali, A H; Kineber, A F; Elyamany, A; Ibrahim, A H and Daoud, A O (2025) Application of Ginni's mean analysis for identifying the stationary driver enhancing modular construction adoption in the building industry. International Journal of Construction Management, 25(3), pp. 322-333. ISSN 1562-3599
Ali, B; Aibinu, A A and Paton-Cole, V (2024) Closing the information gaps: A systematic review of research on delay and disruption claims. Construction Innovation, 24(3), pp. 790-810. ISSN 1471-4175
Ali, F; Chowdary, B V and Gonzales, L (2013) An integrated design approach for rapid product development: A case study through application of reverse engineering, re-engineering and fast prototyping tools. Journal of Engineering, Design and Technology, 11(2), pp. 178-189. ISSN 1726-0531
Ali, G M; Bouferguene, A and Al-Hussein, M (2023) Crane mat layout optimization based on agent-based greedy and reinforcement-learning approach. Journal of Construction Engineering and Management, 149(8): 04023067, ISSN 0733-9364
Ali, M M and Elazouni, A (2009) Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Construction Management and Economics, 27(9), pp. 839-856. ISSN 1466433X
Ali, M M A (2011) A framework for enhancing the success of construction projects undertaken in Libya. PhD thesis, Sheffield Hallam University, UK.
Ali, S A A; Arun, C and Krishnamurthy, K (2021) Re-defining flow in construction process for facilitating the identification and quantification of generic overruns existing in construction industry today. International Journal of Construction Management, 21(2), pp. 113-130. ISSN 1562-3599
Ali Amjad, A (2003) A causal path model to measure the effects of professional training upon time overruns in Saudi construction industry. PhD thesis, Heriot-Watt University, UK.
Aligamhe, V I; Mustapa, M; Ogbu, C P and Misnan, M S (2024) Modelling cost-risk impact on Nigerian highway projects using multiple linear regression and artificial neural networks. Journal of Construction in Developing Countries, 29(2), pp. 107-128. ISSN 1823-6499
Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364
Alinaitwe, H; Apolot, R and Tindiwensi, D (2013) Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), pp. 33-47. ISSN 1823-6499
Alinaitwe, H and Ayesiga, R (2013) Success factors for the implementation of public-private partnerships in the construction industry in Uganda. Journal of Construction in Developing Countries, 18(2), pp. 1-14. ISSN 1823-6499
Alinaitwe, H; Nyamutale, W and Tindiwensi, D (2014) Design phase constructability improvement strategies for highway projects in Uganda. Journal of Construction in Developing Countries, 19(1), pp. 127-140. ISSN 1823-6499
Aliu, J; Aigbavboa, C and Wellington Didibhuku, T (2021) Driving the fourth industrial revolution initiative through university and industry collaborations. Journal of Construction in Developing Countries, 26(2), pp. 211-230. ISSN 1823-6499
Aliu, J; Oke, A E; Abayomi, T; Aigbavboa, C and Makanjuola, S (2024) Exploring the critical success factors for adopting gamification in the Nigerian construction sector. Built Environment Project and Asset Management, 14(2), pp. 184-200. ISSN 2044-124X
Alizadehsalehi, S and Yitmen, I (2023) Digital twin-based progress monitoring management model through reality capture to extended reality technologies (drx). Smart and Sustainable Built Environment, 12(1), pp. 200-236. ISSN 2046-6099
Alkalbani, S; Rezgui, Y; Vorakulpipat, C and Wilson, I E (2013) ICT adoption and diffusion in the construction industry of a developing economy: The case of the Sultanate of Oman. Architectural Engineering and Design Management, 9(1), pp. 62-75. ISSN 1745-2007
Alkass, S; Mazerolle, M and Harris, F (1996) Construction delay analysis techniques. Construction Management and Economics, 14(5), pp. 375-394. ISSN 01446193
Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193
Alkass, S T (1988) An expert system applied to earthmoving operations and equipment selection. PhD thesis, Loughborough University, UK.
Alkayyali, O J (1993) A computerized multi-dimensional support system (CM-DSS) for planning, scheduling and controlling construction projects. PhD thesis, University of Cincinnati, USA.
Alketbi, S R (2020) Effective implementation of value engineering in the housing construction programmes of the UAE. PhD thesis, University of Wolverhampton, UK.
Alkharmany, A (2017) Project management: The effect of saudi national culture on the attitudes of key stakeholders towards delay in construction projects in Saudi Arabia. PhD thesis, University of Brighton, UK.
Alkhathami, M M (2004) Examination of the correlation of critical success and delay factors in construction projects in the kingdom of Saudi Arabia. PhD thesis, University of Pittsburgh, USA.
Alkinani, H (2014) Models of training needs assessment for the Iraqi construction industry. PhD thesis, University of Salford, UK.
Alkriz, K and Mangin, J C (2005) A new model for optimizing the location of cranes and construction facilities using genetic algorithms. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Allahi, Fahimeh (2020) Development of simulation based approaches for cost estimation and effect analysis in industrial and humanitarian projects, including system dynamic model and Monte Carlo simulation. PhD thesis, Università degli Studi di Genova, Italy.
Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects. PhD thesis, Brunel University, UK.
Allam, S I G (1988) Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(2), pp. 93-115. ISSN 01446193
Allan, C; Sommerville, J; Kennedy, P and Robertson, H (2000) A business unit approach to construction process re-engineering. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Allan, S; Jones, K and Walker, S (2006) Retrofitting e-learning to an existing distance learning course: A case study. Architectural Engineering and Design Management, 2(1-2), pp. 137-147. ISSN 1745-2007
Alleman, D and Lee, E B (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), pp. 2859-2891. ISSN 0969-9988
Allen, C and Smallwood, J (2008) Improving construction planning through 4D planning. Journal of Engineering, Design and Technology, 6(1), pp. 7-20. ISSN 1726-0531
Allouche, E N; Ariaratnam, S T and Lueke, J S (2000) Horizontal directional drilling: Profile of an emerging industry. Journal of Construction Engineering and Management, 126(1), pp. 68-76. ISSN 0733-9364
Allport, R J and Ward, S (2010) Operational risk: The focus for major infrastructure? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 121-127. ISSN 17514312
Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.
Almami, A (2014) Investigating the antecedents and consequences of Saudization in the construction sector. PhD thesis, University of Plymouth, UK.
Almarri, K and Boussabaine, H (2017) Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Built Environment Project and Asset Management, 7(5), pp. 546-556. ISSN 2044-124X
Almarri, K; Boussabaine, H and Al Nauimi, H (2023) The influence of risks on the outturn cost of ICT infrastructure network projects. Construction Innovation, 23(1), pp. 85-104. ISSN 1471-4175
Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.
Almatroushi, H; Hariga, M; As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: An integrated approach. Engineering, Construction and Architectural Management, 27(9), pp. 2135-2161. ISSN 0969-9988
Almeida, Y. and Calejo, R. (2026) Innovation in public works management: Proposal for a performance evaluation model based on cost and deadline indicators. Construction Management and Economics, 44(9), pp. 721-740. ISSN 0144-6193
Almutiri, Y R (2016) Empirical investigation into development of a curricular framework to embed building information modelling with undergraduate architectural programmes within Saudi Arabia. PhD thesis, University of Salford, UK.
Alnahari, Mohammed Saeed (2023) Exploring the potential of blockchain technology for improved management and safety of underground utilities. PhD thesis, Arizona State University, USA.
Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.
Alnuaimi, A S; Taha, R A; Al Mohsin, M and Al-Harthi, A S (2010) Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615-622. ISSN 0733-9364
Alosaimi, H (2019) Embedding knowledge management strategies in the Kingdom of Saudi Arabia construction industry. PhD thesis, University of Wolverhampton, UK.
Alotaibi, M; El-Rayes, K and Altuwaim, A (2021) Optimizing the renovation scheduling of leased residential buildings to minimize total project cost. Journal of Construction Engineering and Management, 147(7): 2063, ISSN 0733-9364
Alqahtani, F (2017) The relationship between the values of Abu-Dhabi Police and the competencies of their project managers. PhD thesis, University of Wolverhampton, UK.
Alqahtani, F K; Alkhaldi, M; Alsaqer, T; Abotaleb, I S; Mohamed, A G and Dirar, S (2022) A comparative assessment of advanced construction systems incorporating green concrete. Journal of Construction Engineering and Management, 148(9): 04022083, ISSN 0733-9364
Alqarni, M (2017) Developing a framework to improve the implementation of geospatial technology in the planning and delivery of infrastructure for residential areas in Saudi Arabia: a case study of Riyadh city. PhD thesis, Northumbria University, UK.
Alqubaisi, S (2019) Developing a framework to assess the portfolio governance, risk and compliance of Abu Dhabi Government entities in the UAE. PhD thesis, Aston University, UK.
Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry. PhD thesis, Brunel University, UK.
Alsamarraie, M M and Ghazali, F (2023) Evaluation of organizational procurement performance for public construction projects: Systematic review. International Journal of Construction Management, 23(14), pp. 2499-2508. ISSN 1562-3599
Alsehaimi, A O; Fazenda, P T and Koskela, L (2014) Improving construction management practice with the last planner system: A case study. Engineering, Construction and Architectural Management, 21(1), pp. 51-64. ISSN 0969-9988
Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique. PhD thesis, Brunel University, UK.
Alsharif, M A (2017) Improving sustainability on university campuses in Saudi Arabia: An assessment of organisational and decision-related opportunities and barriers. PhD thesis, University of Reading, UK.
Alshboul, O.; Al-Shboul, K.; Shehadeh, A. and Tatari, O. (2026) Advancing equipment management for construction: Introducing a new model for cost, time and quality optimization. Construction Innovation, 26(4), pp. 1191-1217. ISSN 1471-4175
Alshboul, O. and Shehadeh, A. (2026) Enhancing infrastructure project outcomes through optimized contractual structures and long-term warranties. Engineering, Construction and Architectural Management, 33(3), pp. 2220-2242. ISSN 0969-9988
Alshboul, O. and Shehadeh, A. (2026) Conflict resolution and negotiation in construction projects using game theory: Achieving win-win outcomes. International Journal of Construction Management, 26(7), pp. 1341-1364. ISSN 1562-3599
Alshboul, O (2019) Multi-objective optimization for heavy earthmoving construction equipment management based on time, cost, and pollutant emissions. PhD thesis, University of Central Florida, USA.
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Alshibani, A; El Ghazzawi, Y A; Mohammed, A; Ghaithan, A M and Hassanain, M A (2024) A multi-criteria decision-making model for heavy construction equipment replacement in Saudi Arabia. Journal of Financial Management of Property and Construction, 29(3), pp. 485-511. ISSN 1366-4387
Alshihre, F; Chinyio, E; Nzekwe-Excel, C and Daniel, E I (2020) Improving clients' satisfaction in construction projects: The case of Saudi Arabia. Built Environment Project and Asset Management, 10(5), pp. 709-723. ISSN 2044-124X
Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.
Alsohiman, N K (2017) Modelling variation for improving the management of construction engineering project outcomes in the Kingdom of Saudi Arabia. PhD thesis, University of Liverpool, UK.
Altawil, Shadi N A (2017) Multi-level knowledge extraction and modeling to support job hazard analysis process for oil and gas pipeline projects. PhD thesis, University of Alberta, Canada.
Altuwaim, A and El-Rayes, K (2018) Optimizing the scheduling of repetitive construction to minimize interruption cost. Journal of Construction Engineering and Management, 144(7): 4018051, ISSN 0733-9364
Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364
Altuwaim, A A (2018) Optimal scheduling and resource utilization for repetitive construction projects. PhD thesis, University of Illinois, USA.
Aluko, R O; Adenuga, O A; Kukoyi, P O; Soyingbe, A A and Oyedeji, J O (2016) Predicting the academic success of architecture students by pre-enrolment requirement: Using machine-learning techniques. Construction Economics and Building, 16(4), pp. 86-98. ISSN 2204-9029
Alumbugu, P O (2019) Construction material logistics management: the case of north-central Nigeria. PhD thesis, Nelson Mandela University, South Africa.
Alyatama, M (2021) Application of agile project management in Kuwait oil and gas capital projects. PhD thesis, University of Northampton, UK.
Alzanati, A (2021) Complex building construction projects: reducing rework through facilitation of craftspeople's motivation in United Arab Emirates. PhD thesis, Bournemouth University, UK.
Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.
Alzayd, Rana (2016) A constructability methodology to integrate planning and design for workers' safety in construction management. DrIng thesis, University of Braunschweig & University of Florence, Germany.
Alzeraa, A (2018) Impact of project communications effectiveness on construction disputes. PhD thesis, Wayne State University, USA.
Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599
Amadi, A I (2021) A back-end view to climatic adaptation: Partitioning weather-induced cement demand variance in wet humid environment. International Journal of Building Pathology and Adaptation, 39(2), pp. 153-174. ISSN 23984708
Amadi, A I (2024) Investigating ground-related design deficiencies as potential triggers to cost overruns in highway projects. Journal of Financial Management of Property and Construction, 29(3), pp. 349-371. ISSN 1366-4387
Amany, A; Taghizade, K and Noorzai, E (2020) Investigating conflicts of expert contractors using the last planner system in building information modeling process. Journal of Engineering, Design and Technology, 18(6), pp. 1381-1402. ISSN 1726-0531
Amarasinghe, A A S R; Agdas, D and Dawes, L (2025) Evaluating labour productivity and profitability in precast concrete manufacturing. Engineering, Construction and Architectural Management, 32(13), pp. 148-173. ISSN 0969-9988
Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988
Amarkhil, Q; Elwakil, E; Hubbard, B and Byrd, V L (2023) A framework to standardize causes of construction delay. International Journal of Construction Management, 23(11), pp. 1791-1804. ISSN 1562-3599
Ambekar, S.; Dhaigude, A. S.; Chatterjee, D. and Tapar, A. V. (2025) Identifying and ranking critical success factors for contractor value addition in the construction sector using the ISM-IRP technique. Construction Innovation, 26(5), pp. 1582-1613. ISSN 1471-4175
Amer, F; Koh, H Y and Golparvar-Fard, M (2021) Automated methods and systems for construction planning and scheduling: Critical review of three decades of research. Journal of Construction Engineering and Management, 147(7): 0002093, ISSN 0733-9364
Amin, S H (2024) Predictive relationship in time and cost between planning and construction phases in capital projects. DBA thesis, Grand Canyon University, USA.
Aminbakhsh, A and Sonmez, R (2015) Pareto oriented optimization of discrete time-cost trade-off problem using particle swarm optimization. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.
Aminorlah, A I; Rahim, N A; Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 57-79. ISSN 1823-6499
Amirbeiki Tafti, F.; Han, J.; Katharina Wekenborg, M.; Vande Moere, A.; Schierz, J. H.; Heylighen, A. and Marquardt, G. (2026) Designing healthcare settings with sky and water: Insights from a virtual reality study. Building Research & Information, 54(4), pp. 447-468. ISSN 0961-3218
Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599
Ammar, M A (2003) Float analysis of non-serial repetitive activities. Construction Management and Economics, 21(5), pp. 535-542. ISSN 01446193
Ammar, M A (2011) Optimization of project time-cost trade-off problem with discounted cash flows. Journal of Construction Engineering and Management, 137(1), pp. 65-71. ISSN 0733-9364
Ammar, M A (2013) LOB and CPM integrated method for scheduling repetitive projects. Journal of Construction Engineering and Management, 139(1), pp. 44-50. ISSN 0733-9364
Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193
Ammar, M A (2020) Efficient modeling of time-cost trade-off problem by eliminating redundant paths. International Journal of Construction Management, 20(7), pp. 812-821. ISSN 1562-3599
Ammar, M A (2022) Optimization of line of balance scheduling considering work interruption. International Journal of Construction Management, 22(2), pp. 305-316. ISSN 1562-3599
Ammar, M A and Abd-ElKhalek, S I (2022) Criticality measurement in fuzzy project scheduling. International Journal of Construction Management, 22(2), pp. 252-261. ISSN 1562-3599
Ammar, M A and Abdel-Maged, A F (2018) Modeling of LOB scheduling with learning development effect. International Journal of Construction Management, 18(6), pp. 517-526. ISSN 1562-3599
Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193
Ammar, T; Abdel-Monem, M and El-Dash, K (2025) Regression-based model predicting cost contingencies for road network projects. International Journal of Construction Management, 25(11), pp. 1273-1287. ISSN 1562-3599
Amoah, C; Bamfo-Agyei, E and Simpeh, F (2022) The COVID-19 pandemic: The woes of small construction firms in Ghana. Smart and Sustainable Built Environment, 11(4), pp. 1099-1115. ISSN 2046-6099
Amoah, C; Kajimo-Shakantu, K and Schalkwyk, T (2021) Meeting the expectations of the social housing recipients in South Africa: A myth or reality? International Journal of Building Pathology and Adaptation, 39(2), pp. 218-234. ISSN 23984708
Amoah, C; Kajimo-Shakantu, K and Van Shalkwyk, T (2022) The level of participation of the end-users in the construction of the rdp houses: The case study of manguang municipality. International Journal of Construction Management, 22(5), pp. 949-960. ISSN 1562-3599
Amunzu, I C (2020) A qualitative case study of construction managers’ understanding of lean thinking. PhD thesis, Grand Canyon University, USA.
An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988
Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(2), pp. 163-175. ISSN 1466433X
Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.
Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364
Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364
Anastasopoulos, P C; Labi, S; Bhargava, A and Mannering, F L (2012) Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), pp. 390-398. ISSN 0733-9364
Andary, E G; Abi Shdid, C; Chowdhury, A and Ahmad, I (2020) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(3), pp. 609-633. ISSN 0969-9988
Andersen, M T and Findsen, A L (2019) Exploring the benefits of structured information with the use of virtual design and construction principles in a BIM life-cycle approach. Architectural Engineering and Design Management, 15(2), pp. 83-100. ISSN 1745-2007
Anderson, A K (2015) Visualization, communication, and copresence: Using building information models in virtual worlds. PhD thesis, University of Washington, USA.
Anderson, S; Shane, J S and Schexnayder, C (2011) Strategies for planned project acceleration. Journal of Construction Engineering and Management, 137(5), pp. 372-381. ISSN 0733-9364
Ang, G; Groosman, M and Scholten, N P M (2005) Dutch performance-based approach to building regulations and public procurement. Building Research & Information, 33(2), pp. 107-119. ISSN 0961-3218
Angelidi, A (2007) Delays in construction projects in Greece: Causes, effects and project management tools. PhD thesis, University College London, UK.
Annamalaisami, C D and Kuppuswamy, A (2022) Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6), pp. 1079-1089. ISSN 1562-3599
Anondho, B; Soeleiman, L; Latief, Y and Mochtar, K (2023) The influence of external factors on construction project performance based on estimated duration in Jakarta. International Journal of Construction Management, 23(13), pp. 2270-2278. ISSN 1562-3599
Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(1), pp. 62-76. ISSN 0969-9988
Ansah, S K (2018) An integrated total quality management model for the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.
Anson, M and Siu, M F F (2020) Augmented balance point diagrams for matching site and concrete-supply resources. Journal of Construction Engineering and Management, 146(4): 04020021, ISSN 0733-9364
Anson, M; Tang, S L and Ying, K C (2002) Measurement of the performance of ready mixed concreting resources as data for system simulation. Construction Management and Economics, 20(3), pp. 237-250. ISSN 01446193
Anson, M; Ying, K C T and Siu, M F F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(8), pp. 1672-1695. ISSN 0969-9988
Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Antwi, A and Deakin, M (1996) Discounting, obsolescence, depreciation and their effects on the environment of cities. Journal of Financial Management of Property and Construction, 1(2), pp. 39-56. ISSN 1366-4387
Antwi-Afari, M F; Li, H; Umer, W; Yu, Y and Xing, X (2020) Construction activity recognition and ergonomic risk assessment using a wearable insole pressure system. Journal of Construction Engineering and Management, 146(7): 04020077, ISSN 0733-9364
Anumba, C (2006) Application of GIS to labour market planning in construction. EngD thesis, Loughborough University, UK.
Anumba, C; Dainty, A R J; Ison, S G and Sergeant, A (2005) The application of GIS to construction labour market planning. Construction Innovation, 5(4), pp. 219-230. ISSN 1471-4175
Anumba, C E H; Dainty, A; Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(6), pp. 616-633. ISSN 0969-9988
Anumba, C J and Evbuomwan, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), pp. 271-281. ISSN 01446193
Anumba, C J; Issa, R R A; Pan, J and Mutis, I (2008) Ontology-based information and knowledge management in construction. Construction Innovation, 8(3), pp. 218-239. ISSN 1471-4175
Anwar, Waqas (2019) Development of multiple linear regression model and rule based decision support system to improve supply chain management of road construction projects in disaster regions. PhD thesis, University of Bradford, UK.
Anwer, S; Li, H; Antwi-Afari, M F; Mirza, A M; Rahman, M A; Mehmood, I; Guo, R and Wong, A Y L (2024) Evaluation of data processing and artifact removal approaches used for physiological signals captured using wearable sensing devices during construction tasks. Journal of Construction Engineering and Management, 150(1): 03123008, ISSN 0733-9364
Anzagira, L F; Duah, D; Badu, E; Simpeh, E K and Marful, A B (2024) Stimulation strategies to promote green building uptake in developing countries: The case of Ghana. Journal of Engineering, Design and Technology, 22(3), pp. 1012-1029. ISSN 1726-0531
Aoieong, R T; Tang, S L and Ahmed, S M (2002) A process approach in measuring quality costs of construction projects: Model development. Construction Management and Economics, 20(2), pp. 179-192. ISSN 01446193
Aoieong, Raymond Taiman (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM). PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.
Aouad, G F and Barrett, P S (1998) The feasibility of using hybrid concrete structures within the context of cost and time. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Aouad, G F; Kawooya, A A O and Price, A D F (1996) Construction planning models: A review of history, capabilities and limitations. Journal of Construction Procurement, 2(2), pp. 19-37. ISSN 1358-9180
Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.
Apipattanavis, S (2007) Stochastic nonparametric methods for multi-site weather generation and flood frequency estimation: Applications to construction delay, hydrology and agricultural modeling. PhD thesis, University of Colorado at Boulder, USA.
Apipattanavis, S; Sabol, K; Molenaar, K R; Rajagopalan, B; Xi, Y; Blackard, B and Patil, S (2010) Integrated framework for quantifying and predicting weather-related highway construction delays. Journal of Construction Engineering and Management, 136(11), pp. 1160-1168. ISSN 0733-9364
Appau, K A (1994) An integrated model of computer-aided cost estimating/scheduling in construction management. PhD thesis, Georgia Institute of Technology, USA.
Appireddy, K and George, G (2026) Lean tools for enhancing construction project performance: Integration of LPS and LBMS in utility power distribution projects. International Journal of Construction Management, 26(5), pp. 789-804. ISSN 1562-3599
Apu, N and Sinha, R (2020) Seismic fragility assessment of ductile reinforced concrete building frames. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 425-442. ISSN 1759-5916
Arabiat, A; Edum-Fotwe, F T and McCaffer, R (2007) Does client behaviour actively induce risk in construction projects? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Arabpour Roghabadi, M and Moselhi, O (2021) Optimized crew selection for scheduling of repetitive projects. Engineering, Construction and Architectural Management, 28(6), pp. 1517-1540. ISSN 0969-9988
Arai, K and Morimoto, E (2020) Renovation of the Japanese construction industry: Evaluation of i-Construction from the perspective of construction management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Arain, F M (2006) Knowledge-based decision support system (kbdss) for management of variation orders for school building projects in Singapore. PhD thesis, National University of Singapore, Singapore.
Arantes, A and Ferreira, L M D F (2020) Underlying causes and mitigation measures of delays in construction projects: An empirical study. Journal of Financial Management of Property and Construction, 25(2), pp. 165-181. ISSN 1366-4387
Arashpour, M; Wakefield, R; Blismas, N and Abbasi, B (2016) Quantitative analysis of rate-driven and due date-driven construction: Production efficiency, supervision, and controllability in residential projects. Journal of Construction Engineering and Management, 142(1): 05015012, ISSN 0733-9364
Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2014) Analysis of disruptions caused by construction field rework on productivity in residential projects. Journal of Construction Engineering and Management, 140(2): 04013053, ISSN 0733-9364
Araujo, Adolpho Guido de (2021) Methodology for evaluation of environmental aspects in urban subdivision works in the pre-construction phase. PhD thesis, Universidade Federal de Pernambuco, Brazil.
Araujo, Luís Otávio Cocito de (2005) Method to propose directions improving labor productivity in the steel reinforcement activities. PhD thesis, Universidade de São Paulo, Brazil.
Araújo, C S; Ferreira, E A M and Costa, D B (2025) System for tracking and managing metallic formworks adopted in cast-in-place concrete wall systems by integrating IoT and BIM. Construction Innovation, 25(4), pp. 1315-1341. ISSN 1471-4175
Araújo, L G and Lucko, G (2016) Slip chart-inspired project schedule diagramming: Links, extension to network schedules, and unification. Journal of Construction Engineering and Management, 142(7): 4016011, ISSN 0733-9364
Arbon, P; Steenkamp, M; Cornell, V; Cusack, L and Gebbie, K (2016) Measuring disaster resilience in communities and households: Pragmatic tools developed in Australia. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 201-215. ISSN 1759-5916
Arbulu, R J; Tommelein, I D; Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(2), pp. 161-171. ISSN 0961-3218
Arditi, D (1984) Graduate education in construction management. Construction Management and Economics, 2(3), pp. 193-199. ISSN 01446193
Arditi, D (1985) Construction productivity improvement. Journal of Construction Engineering and Management, 111(1), pp. 1-14. ISSN 0733-9364
Arditi, D; Akan, G T and Gurdamar, S (1985) Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(2), pp. 171-181. ISSN 01446193
Arditi, D and Albulak, M Z (1986) Line-of-balance scheduling in pavement construction. Journal of Construction Engineering and Management, 112(3), pp. 411-424. ISSN 0733-9364
Arditi, D; Elhassan, A and Toklu, Y C (2002) Constructability analysis in the design firm. Journal of Construction Engineering and Management, 128(2), pp. 117-126. ISSN 0733-9364
Arditi, D; Khisty, C J and Yasamis, F (1997) Incentive/disincentive provisions in highway contracts. Journal of Construction Engineering and Management, 123(3), pp. 302-307. ISSN 0733-9364
Arditi, D and Koseoglu, H (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics, 1(1), pp. 3-16. ISSN 01446193
Arditi, D and Mochtar, K (1996) Productivity improvement in the Indonesian construction industry. Construction Management and Economics, 14(1), pp. 13-24. ISSN 01446193
Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193
Arditi, D and Patel, B K (1989) Impact analysis of owner-directed acceleration. Journal of Construction Engineering and Management, 115(1), pp. 144-157. ISSN 0733-9364
Arditi, D and Pattanakitchamroon, T (2008) Analysis methods in time-based claims. Journal of Construction Engineering and Management, 134(4), pp. 242-252. ISSN 0733-9364
Arditi, D; Sikangwan, P and Tokdemir, O B (2002) Scheduling system for high rise building construction. Construction Management and Economics, 20(4), pp. 353-364. ISSN 01446193
Arditi, D; Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), pp. 90-103. ISSN 0969-9988
Arditi, D; Tokdemir, O B and Suh, K (2002) Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management, 128(6), pp. 545-556. ISSN 0733-9364
Arditi, D A (1973) An investigation into the behavioural and technical factors affecting success in the use of network analysis in the construction industry of Great Britain. PhD thesis, Loughborough University, UK.
Ardron, T G and Allwood, J M (2025) Exploring time and cost optimization in energy retrofit programmes of traditionally constructed, owner-occupied UK dwellings. Building Research & Information, 53(3), pp. 397-415. ISSN 0961-3218
Arhinful, R; Attabra, F K; Mensah, L and Obeng, H A (2026) The mediating role of talent management in the relationship between project manager competencies and sustainable competitive advantage in the Ghanaian construction industry. Construction Management and Economics, 44(2), pp. 119-142. ISSN 0144-6193
Aritua, B; Male, S and Bower, D (2009) Defining the intelligent public sector construction client. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 75-82. ISSN 17514312
Aritua, B; Smith, N J and Athiyo, R (2008) Private finance for the delivery of school projects in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 141-146. ISSN 17514312
Ariyachandra, M F (2021) Automating the generation of geometric information models to support digital twinning of existing rail infrastructure. PhD thesis, University of Cambridge, UK.
Arneson, E (2018) Construction capacity: How regional construction supply chains respond to disruptions. PhD thesis, University of Colorado at Boulder, USA.
Arora, J; Kar, S and Jha, K N (2023) Assessment of the significance of identified attributes affecting the rebar-fixing productivity using multiple regression. Journal of Construction Engineering and Management, 149(6): 04023039, ISSN 0733-9364
Arowoiya, V A and Oyefusi, O N (2023) An analysis of the benefits of adopting modular construction: A Nigerian construction industry context. Journal of Construction in Developing Countries, 28(1), pp. 243-265. ISSN 1823-6499
Arthur, A C (2016) The impact of systems differentiation and affect heuristics in intuitive construction risk management decision making systems. PhD thesis, University College London, UK.
Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.
Arvanitis, L.; Al-Tarazi, D.; Agyekum, K.; Kissi, E.; Manu, P.; Mahamadu, A. M.; Booth, C.; Prabhakaran, A. and Pittri, H. (2025) BIM maturity and its influence on BIM implementation challenges: The perspectives of UK contractors. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(4), pp. 231-243. ISSN 1751-4304
Asadi, E (2020) Risk-informed multi-criteria decision framework for resilience and sustainability assessment of building structures. PhD thesis, Case Western Reserve University, USA.
Asadi, S; Sharghi, A; Mottaki, Z and Salehsedghpour, B (2025) Housing reconstruction after traumatic events: A POE study of Bam housing after the 2003 earthquake, Iran. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 57-71. ISSN 1759-5908
Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.
Asgari, S; Afshar, A and Madani, K (2014) Cooperative game theoretic framework for joint resource management in construction. Journal of Construction Engineering and Management, 140(3): 04013066, ISSN 0733-9364
Ashrafi, R M (1981) Risk analysis in management planning and project control: probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty. PhD thesis, University of Bradford, UK.
Ashton, P and Gidado, K (2001) Risk associated with inadequate site investigation procedures under design and build procurement systems. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364
Asiedu, R O; Adaku, E and Owusu-Manu, D-G (2017) Beyond the causes: Rethinking mitigating measures to avert cost and time overruns in construction projects. Construction Innovation, 17(3), pp. 363-380. ISSN 1471-4175
Asiedu, R O; Frempong, N K and Alfen, H W (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(1), pp. 21-39. ISSN 0969-9988
Asiedu, R O; Frempong, N K and Nani, G (2016) Parametric time overrun estimation of building projects. Journal of Financial Management of Property and Construction, 21(3), pp. 253-268. ISSN 1366-4387
Asiedu, R O and Gyadu-Asiedu, W (2020) Assessing the predictability of construction time overruns using multiple linear regression and Markov chain Monte Carlo. Journal of Engineering, Design and Technology, 18(3), pp. 583-600. ISSN 1726-0531
Asiedu, R O; Manu, P; Mahamadu, A M; Booth, C A; Olomolaiye, P; Agyekum, K and Abadi, M (2023) Critical skills for infrastructure procurement: Insights from developing country contexts. Journal of Engineering, Design and Technology, 21(6), pp. 1948-1974. ISSN 1726-0531
Aslam, M (2021) Optimizing selection and implementation protocols of lean construction tools and techniques for rapid initial successes. PhD thesis, North Dakota State University, USA.
Aslani, P (2007) Dynamic resource -constrained scheduling. PhD thesis, Polytechnic University, USA.
Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364
Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran. PhD thesis, Nottingham Trent University, UK.
Asnaashari, E; Knight, A; Hurst, A and Farahani, S S (2009) Causes of construction delays in Iran: Project management, logistics, technology and environment. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Assaad, R; El-Adaway, I H and Abotaleb, I S (2020) Predicting project performance in the construction industry. Journal of Construction Engineering and Management, 146(5): 04020030, ISSN 0733-9364
Assaad, R A (1991) Structured labor markets: The case of the construction sector in Egypt. PhD thesis, Cornell University, USA.
Assaad, R H; Omran, A; Soliman, N and Assaf, G (2024) Prediction of the lateral pressure of self-consolidating concrete on construction formwork systems using machine-learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024110, ISSN 0733-9364
Assadi, S O A (1997) An investigation of the records kept by supervisors on construction sites. PhD thesis, University of Newcastle upon Tyne, UK.
Assaf, S (1987) Feasibility assessment of large-scale housing development in Saudi Arabia: A case study. Construction Management and Economics, 5(2), pp. 157-168. ISSN 01446193
Assaf, S A and Barhamain, S Y (1996) Factors affecting construction practices in Makkah Al-Mukkaramah, Saudi Arabia. Building Research & Information, 24(1), pp. 27-30. ISSN 0961-3218
Astaneh Asl, B (2019) Effects of using virtual reality on AEC team collaboration. PhD thesis, University of Washington, USA.
Atanasov, V; Greenwood, D; Thurairajah, N and Hatcher, C (2021) Forensic delay analysis: An investigation of the reasons for disagreements in time-related disputes. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Atapattu, C N; Domingo, N and Sutrisna, M (2023) Significant factors affecting the New Zealand transportation infrastructure project cost: quantity surveyors' perception. Built Environment Project and Asset Management, 13(5), pp. 756-777. ISSN 2044-124X
Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.
Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599
Atiq Ur Rehman, M.; Khan, S. A. and Chaabane, A. (2026) An integrated decision support model for early planning in off-site construction projects. Journal of Construction Engineering and Management, 152(9): 04026142, ISSN 0733-9364
Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.
Atkinson, B (2000) Inca: A retrospective performance tool for project management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Atout, M M M (2008) Causes of delays in construction projects & how the project manager can act to avoid delays. PhD thesis, University of South Wales, UK.
Attalla, M M A M (2000) Reconstruction of operating facilities: A model for project management. PhD thesis, University of Waterloo, Canada.
Attar, A; Boudjakdji, M A; Bhuiyan, N; Grine, K; Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(4), pp. 376-391. ISSN 0969-9988
Attara, M G (2015) Predicting cost overrun of railroad bridge construction. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Atwal, P; Morton, P and Watts, N (2007) Mentoring in built environment higher education courses. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Austigard, M S and Mattsson, J (2020) Monitoring climate change related biodeterioration of protected historic buildings. International Journal of Building Pathology and Adaptation, 38(4), pp. 529-538. ISSN 23984708
Austin, R B; Pishdad-Bozorgi, P and De La Garza, J M (2016) Identifying and prioritizing best practices to achieve flash track projects. Journal of Construction Engineering and Management, 142(2): 04015077, ISSN 0733-9364
Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193
Austin, S; Baldwin, A and Waskett, P (1997) Development of a prototype building design management tool. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Avetisyan, H G; Miller-Hooks, E and Melanta, S (2012) Decision models to support greenhouse gas emissions reduction from transportation construction projects. Journal of Construction Engineering and Management, 138(5), pp. 631-641. ISSN 0733-9364
Awagah, Nicholas K (2024) An integrated framework for mentoring artisans in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Awe, E M; Stephenson, P and Griffith, A (2009) An assessment of education and training needs of skilled operatives within the Nigerian construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Awwad, R E (2010) Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics. PhD thesis, University of Michigan, USA.
Ayat, M; Rehman, H; Qureshi, S M and Kang, C W (2023) Assessing the causes of project overruns in tunnel construction projects in Pakistan. International Journal of Construction Management, 23(11), pp. 1856-1866. ISSN 1562-3599
Aydın, M (2025) Evaluation of master's degree programmes in project and construction management: an agglomerative hierarchical clustering study. International Journal of Construction Management, 25(1), pp. 18-31. ISSN 1562-3599
Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.
Ayinla, K (2021) Development of a semantic knowledge modelling approach for evaluating offsite manufacturing production processes. PhD thesis, Birmingham City University, UK.
Ayinla, K; Cheung, F and Towe, B (2025) Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding. Construction Management and Economics, 43(8), pp. 637-656. ISSN 0144-6193
Ayodele, E O (2017) Development of a framework in minimising errors in construction documents in Nigeria. PhD thesis, University of Salford, UK.
Ayodele, T R (2025) Cost of selected smart building elements and its level of implementation in Abuja. Journal of Financial Management of Property and Construction, 30(2), pp. 335-355. ISSN 1366-4387
Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.
Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364
Azambuja, M M B (2009) A decision support system for rapid evaluation and selection of engineered equipment suppliers. PhD thesis, University of Texas at Austin, USA.
Azhar, N (2014) Integrated construction project delivery system in the U.S. Public sector: An information modeling framework. PhD thesis, Florida International University, USA.
Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects. PhD thesis, University of Alberta, Canada.
Aziz, A M A (2008) Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects. Construction Management and Economics, 26(5), pp. 507-529. ISSN 1466433X
Aziz, Z (2005) Context-aware information delivery for mobile construction workers. PhD thesis, Loughborough University, UK.
Ağar, M (2024) A rule based expert system for delay analysis in construction projects. PhD thesis, Middle East Technical University, Turkey.
Babangida, I; Olubodun, F and Kangwa, J (2012) Building refurbishment: Holistic evaluation of barriers and opportunities. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Babatunde, S O; Adeniyi, O and Awodele, O A (2017) Investigation into the causes of delay in land acquisition for PPP projects in developing countries. Journal of Engineering, Design and Technology, 15(4), pp. 552-570.
Babatunde, S O and Ekundayo, D (2019) Barriers to the incorporation of BIM into quantity surveying undergraduate curriculum in the Nigerian universities. Journal of Engineering, Design and Technology, 17(3), pp. 629-648. ISSN 1726-0531
Babatunde, S O; Ekundayo, D; Adekunle, A O and Bello, W (2020) Comparative analysis of drivers to BIM adoption among AEC firms in developing countries: A case of Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1425-1447. ISSN 1726-0531
Babatunde, S O; Ekundayo, D; Babalola, O and Jimoh, J A (2018) Analysis of the drivers and benefits of BIM incorporation into quantity surveying profession: Academia and students' perspectives. Journal of Engineering, Design and Technology, 16(5), pp. 750-766. ISSN 1726-0531
Babatunde, S O; Perera, S; Ekundayo, D and Adeleye, T E (2020) An investigation into BIM-based detailed cost estimating and drivers to the adoption of BIM in quantity surveying practices. Journal of Financial Management of Property and Construction, 25(1), pp. 61-81. ISSN 1366-4387
Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099
Back, W E (1994) Quantifying benefits of electronic technology applied to bulk materials management. PhD thesis, Clemson University, USA.
Back, W E; Boles, W W and Fry, G T (2000) Defining triangular probability distributions from historical cost data. Journal of Construction Engineering and Management, 126(1), pp. 29-37. ISSN 0733-9364
Back, W E; Grau, D and Mejia-Aguilar, G (2013) Effectiveness evaluation of contract incentives on project performance. International Journal of Construction Education and Research, 9(4), pp. 288-306. ISSN 1557-8771
Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029
Badi, Sulafa M (2012) Sustainable energy innovation (SEI) within private finance initiative (PFI) projects. PhD thesis, University College London, UK.
Badra, N; Hegazy, H; Zhang, J; Yahia, M; Fathy, M and AboulHaggag, S (2025) Application of fuzzy multi-objective model for crashing the construction of steel structure projects post-pandemic (Covid-19). International Journal of Construction Management, 25(3), pp. 363-374. ISSN 1562-3599
Badran, S S and Abdallah, A B (2025) Lean vs agile project management in construction: Impacts on project performance outcomes. Engineering, Construction and Architectural Management, 32(5), pp. 2844-2869. ISSN 0969-9988
Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.
Bahadir, M (2025) Predicting construction project durations in Europe using regression analysis methodology. DEngr thesis, George Washington University, USA.
Baiden, B K (2006) Framework for the integration of the project delivery team. PhD thesis, Loughborough University, UK.
Bajjou, M S and Chafi, A (2026) Enhancing environmental sustainability through lean construction principles: An industry-based SEM analysis. Engineering, Construction and Architectural Management, 33(1), pp. 171-206. ISSN 0969-9988
Bajjou, M S and Chafi, A (2020) Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management, 20(7), pp. 783-800. ISSN 1562-3599
Bajjou, M S and Chafi, A (2025) Developing and validating a new conceptual model for successful implementation of lean construction: SEM analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1581-1620. ISSN 0969-9988
Bakens, W; Foliente, G and Jasuja, M (2005) Engaging stakeholders in performance-based building: Lessons from the performance-based building (PeBBu) network. Building Research & Information, 33(2), pp. 149-158. ISSN 0961-3218
Baker, H (2021) A multimethod approach to learning from text-based construction failure data. PhD thesis, University of Edinburgh, UK.
Baker, H; Velikova, M; Smith, S D; Masterton, G and Hewlett, B (2024) Understanding and learning from failure. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(1), pp. 3-14. ISSN 17514304
Baker, T O (2021) An investigation into pricing anomalies and the influence of information processing constraints on forecasts derived from sports betting markets. PhD thesis, University of Southampton, UK.
Bakhshi Khayani, P (2011) A Bayesian model for controlling cost overrun in a portfolio of construction projects. PhD thesis, Northeastern University, USA.
Bakhtiyari, S; Kalali, A; Taghi Akbari, L and Farahbod, F (2017) The experimental behavior of CFRP-strengthened reinforced concrete slabs with fire protection systems subjected to standard fire exposure. International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 238-250. ISSN 1759-5916
Bakry, I; Moselhi, O and Zayed, T (2016) Optimized scheduling and buffering of repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 23(6), pp. 782-800. ISSN 0969-9988
Bala, K; Bustani, S A and Waziri, B S (2014) A computer-based cost prediction model for institutional building projects in Nigeria: An artificial neural network approach. Journal of Engineering, Design and Technology, 12(4), pp. 519-530.
Balali, V; Zalavadia, A and Heydarian, A (2020) Real-time interaction and cost estimating within immersive virtual environments. Journal of Construction Engineering and Management, 146(2): 04019098, ISSN 0733-9364
Baldwin, A N (1982) Computer aided estimating for civil engineering contractors. PhD thesis, Loughborough University, UK.
Baldwin, A N; Austin, S A and Pendlebury, M C (1997) Interface of early design and cost advice in the building design process. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Ballal, T M A (1999) The use of artificial neural networks for modelling buildability in preliminary structural design. PhD thesis, Loughborough University, UK.
Ballard, G; Harper, N and Zabelle, T (2003) Learning to see work flow: An application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), pp. 6-14. ISSN 0969-9988
Ballard, G and Howell, G (1998) Shielding production: Essential step in production control. Journal of Construction Engineering and Management, 124(1), pp. 11-17. ISSN 0733-9364
Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.
Ballesteros-Pérez, P (2017) M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063, ISSN 0733-9364
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Cerezo-Narváez, A; Lucko, G; Pastor-Fernández, A; Otero-Mateo, M and Contreras-Samper, J P (2020) Forecasting accuracy of in-progress activity duration and cost estimates. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364
Ballesteros-Pérez, P; Smith, S T; Lloyd-Papworth, J G and Cooke, P (2018) Incorporating the effect of weather in construction scheduling and management with sine wave curves: Application in the United Kingdom. Construction Management and Economics, 36(12), pp. 666-682. ISSN 01446193
Ballesteros-Pérez, P; del Campo-Hitschfeld, M L; González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621. ISSN 0969-9988
Balloffet, A F (1992) Applications of decision support systems in water resources planning: The goal-setting stage. PhD thesis, Colorado State University, USA.
Balogun, T B; Awonuga, O O and Abowen-Dake, R (2023) Investigating digital technological competencies amongst black Asian minority ethnic construction students in the UK. Journal of Engineering, Design and Technology, 21(6), pp. 1857-1882. ISSN 1726-0531
Bamana, F; Lehoux, N and Cloutier, C (2019) Simulation of a construction project: Assessing impact of just-in-time and lean principles. Journal of Construction Engineering and Management, 145(5): 05019005, ISSN 0733-9364
Banerjee, S (2022) Developing an organization-wide knowledge repository with intelligent knowledge transference to enhance construction project outcomes. PhD thesis, North Carolina State University, USA.
Bani Ismail, L (2012) An evaluation of the implementation of total quality management within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.
Bani Ismail, Loiy (2012) An evaluation of the implementation of total quality management (TQM) within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.
Banihashemi, S A and Khalilzadeh, M (2021) Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach. Engineering, Construction and Architectural Management, 28(7), pp. 1979-2004. ISSN 0969-9988
Banik, G C (2001) Construction productivity improvement: Current US perspective. Journal of Construction Procurement, 7(2), pp. 60-71. ISSN 1358-9180
Banks, C; Kotecha, R; Curtis, J; Dee, C; Pitt, N and Papworth, R (2018) Enhancing high-rise residential construction through design for manufacture and assembly: A UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 164-174. ISSN 17514304
Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(1), pp. 1-18. ISSN 1562-3599
Baqerin, M H; Shafahi, Y and Kashani, H (2016) Application of Weibull analysis to evaluate and forecast schedule performance in repetitive projects. Journal of Construction Engineering and Management, 142(2): 04015058, ISSN 0733-9364
Barati, M K and Bankaru-Swamy, S (2026) A living lab approach to co-designing climate adaptation strategies. Buildings & Cities, 7(1), pp. 39-57. ISSN 2632-6655
Barati, K; Shen, X; Li, N and Carmichael, D G (2022) Automatic mass estimation of construction vehicles by modeling operational and engine data. Journal of Construction Engineering and Management, 148(3): 4021208, ISSN 0733-9364
Barcia, R M (1985) Construction production planning and optimal control. PhD thesis, University of Waterloo, Canada.
Barima, O and Rowlinson, S M (2010) Critical, manifest variables in virtual construction project value delivery. Engineering, Construction and Architectural Management, 17(2), pp. 197-209. ISSN 0969-9988
Barker, R; Childerhouse, P; Naim, M; Masat, J and Wilson, D (2004) Potential of total cycle time compression in construction: Focus on program development and design. Journal of Construction Engineering and Management, 130(2), pp. 177-187. ISSN 0733-9364
Barkokebas, B; Al-Hussein, M and Hamzeh, F (2023) Assessment of digital twins to reassign multiskilled workers in offsite construction based on lean thinking. Journal of Construction Engineering and Management, 149(1): 04022143, ISSN 0733-9364
Barnes, C J (1999) A methodology for the concurrent design of products and their assembly sequence. PhD thesis, Cranfield University, UK.
Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal. PhD thesis, University of Southampton, UK.
Barraza, G A (2011) Probabilistic estimation and allocation of project time contingency. Journal of Construction Engineering and Management, 137(4), pp. 259-265. ISSN 0733-9364
Barraza, G A; Back, W E and Mata, F (2000) Probabilistic monitoring of project performance using ss-curves. Journal of Construction Engineering and Management, 126(2), pp. 142-148. ISSN 0733-9364
Barraza, G A; Back, W E and Mata, F (2004) Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25-32. ISSN 0733-9364
Barraza, G A and Bueno, R A (2007) Probabilistic control of project performance using control limit curves. Journal of Construction Engineering and Management, 133(12), pp. 957-965. ISSN 0733-9364
Barrientos-Orellana, A; Ballesteros-Pérez, P; Mora-Melia, D; González-Cruz, M C and Vanhoucke, M (2022) Stability and accuracy of deterministic project duration forecasting methods in earned value management. Engineering, Construction and Architectural Management, 29(3), pp. 1449-1469. ISSN 0969-9988
Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.
Bascoul, A M (2017) Managing project structural complexity by integrating facility management in planning, designing, and execution of high-end facility upgrades. PhD thesis, University of California, Berkeley, USA.
Bashford, H H; Sawhney, A; Walsh, K D and Kot, K (2003) Implications of even flow production methodology for U.S. Housing industry. Journal of Construction Engineering and Management, 129(3), pp. 330-332. ISSN 0733-9364
Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364
Bashir, A M; Suresh, S; Proverbs, D and Gameson, R (2011) A critical, theoretical, review of the impacts of lean construction tools in reducing accidents on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Bassanino, M; Fernando, T and Wu, K C (2014) Can virtual workspaces enhance team communication and collaboration in design review meetings? Architectural Engineering and Design Management, 10(3-4), pp. 200-217. ISSN 1745-2007
Bassioni, H; Emasry, M I; Ragheb, A M and Youssef, A A (2012) Time series analysis for the prediction of RC material components prices in Egypt. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Bataglin, Fernanda Saidelles (2023) Prescriptive conceptual framework for planning and controlling engineer-to-order industrialized building systems. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.
Bataw, A (2016) On the integration of building information modelling in undergraduate civil engineering programmes in the United Kingdom. PhD thesis, University of Manchester, UK.
Bates, M; Sturges, J; McGowan, K and Sommerville, J (1999) Material supply in house construction: The potential to enhance performance by improving communication. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Batselier, J and Vanhoucke, M (2015) Empirical evaluation of earned value management forecasting accuracy for time and cost. Journal of Construction Engineering and Management, 141(11): 05015010, ISSN 0733-9364
Battikha, M G and Davidson, C H (1996) Cause and effect 3-D model for measuring performance in construction acceleration: A decision support system. Building Research & Information, 24(6), pp. 351-357. ISSN 0961-3218
Baumann, L (2013) The impact of national culture on project management in the Middle East. PhD thesis, Loughborough University, UK.
Bausman, D C (2002) An empirical investigation of the relationship between strategic planning and performance of large construction firms. PhD thesis, Heriot-Watt University, UK.
Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.
Bayandor, S; Kalatehjari, R; Akherati, R and Kasebzadeh, J (2025) Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects. Built Environment Project and Asset Management, 15(2), pp. 309-336. ISSN 2044-124X
Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.
Bayrak, T (2008) Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge. PhD thesis, Heriot-Watt University, UK.
Bayrak, T and Kaka, A (2004) Evaluation of digital photogrammetry and 3D CAD modelling applications in construction management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Bayraktar, M E and Hastak, M (2009) Bayesian belief network model for decision making in highway maintenance: Case studies. Journal of Construction Engineering and Management, 135(12), pp. 1357-1369. ISSN 0733-9364
Beainy, F; Commuri, S and Zaman, M (2012) Quality assurance of hot mix asphalt pavements using the intelligent asphalt compaction analyzer. Journal of Construction Engineering and Management, 138(2), pp. 178-187. ISSN 0733-9364
Beardmore, D C and Molenaar, K R (2023) Roadway design and construction in infrastructure limited contexts: A risk breakdown structure. International Journal of Construction Management, 23(10), pp. 1675-1683. ISSN 1562-3599
Bearup, W K (1995) An environment to support computer-assisted design review. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Bebelaar, N; Braggaar, R C; Kleijwegt, C M; Meulmeester, R W E; Michailidou, G; Salheb, N; van der Spek, S; Vaissier, N and Verbree, E (2018) Monitoring urban environmental phenomena through a wireless distributed sensor network. Smart and Sustainable Built Environment, 7(1), pp. 68-79. ISSN 2046-6099
Beh, H J; Rashidi, A; Talei, A and Lee, Y S (2022) Developing engineering students' capabilities through game-based virtual reality technology for building utility inspection. Engineering, Construction and Architectural Management, 29(7), pp. 2854-2877. ISSN 0969-9988
Beheiry, S M A (2005) Examining the impact of corporate commitment to sustainability. PhD thesis, University of Texas at Austin, USA.
Beheiry, S M A; Chong, W K and Haas, C T (2006) Examining the business impact of owner commitment to sustainability. Journal of Construction Engineering and Management, 132(4), pp. 384-392. ISSN 0733-9364
Bekdik, B; Pörzgen, J; Bull, S S and Thuesen, C (2018) Modularising design processes of façades in Denmark: Re-exploring the use of design structure matrix. Architectural Engineering and Design Management, 14(1-2), pp. 95-108. ISSN 1745-2007
Belias, E and Licina, D (2022) Outdoor pm2.5 air filtration: Optimising indoor air quality and energy. Buildings & Cities, 3(1), pp. 186-203. ISSN 2632-6655
Beliveau, Y; Dixit, S and Dal, T (1993) Dynamic damping of payload motion for cranes. Journal of Construction Engineering and Management, 119(3), pp. 631-644. ISSN 0733-9364
Bell, L C and Stukhart, G (1987) Costs and benefits of materials management systems. Journal of Construction Engineering and Management, 113(2), pp. 222-234. ISSN 0733-9364
Bello, A. O. (2026) Towards achieving circular economy in the Nigerian construction industry: Policymakers perspectives and conceptual framework development. Smart and Sustainable Built Environment, 15(3), pp. 1391-1411. ISSN 2046-6099
Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.
Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.
Ben-Haim, Y and Laufer, A (1998) Robust reliability of projects with activity-duration uncertainty. Journal of Construction Engineering and Management, 124(2), pp. 125-131. ISSN 0733-9364
Bendi, D (2017) Developing an offsite readiness framework for Indian construction organisations. PhD thesis, University of Salford, UK.
Bendi, D; Rana, M Q; Arif, M; Goulding, J S and Kaushik, A K (2021) Understanding off-site readiness in Indian construction organisations. Construction Innovation, 21(1), pp. 105-122. ISSN 1471-4175
Benjaoran, V and Bhokha, S (2009) Enhancing visualization of 4D CAD model compared to conventional methods. Engineering, Construction and Architectural Management, 16(4), pp. 392-408. ISSN 0969-9988
Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193
Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193
Bennett, Brian Kevin (2023) Increasing knowledge of scheduling activity sequencing in construction management education using interactive 3D gaming models. PhD thesis, University of Florida, USA.
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193
Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099
Bentley, D (2000) Control and emergence: The paradox of construction management. PhD thesis, University of Hertfordshire, UK.
Bentley, D and Stacey, R (1998) The potential for applying complex adaptive systems theory to the process of estimating in the construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Beran, V and Dlask, P (2007) Nonlinear optimisation and rational cash flow. Engineering, Construction and Architectural Management, 14(3), pp. 277-292. ISSN 0969-9988
Beran, V; Dlask, P; Eaton, D; Hromada, E and Zindulka, O (2011) Mapping of synchronous activities through virtual management momentum simulation. Construction Innovation, 11(2), pp. 190-211. ISSN 1471-4175
Berawi, M A; Miraj, P; Arifuddin, R; Aulia, D and Rahma, S H (2022) Investigating current practice on disincentive programmes in the Indonesian construction industry. Journal of Construction in Developing Countries, 27(2), pp. 87-107. ISSN 1823-6499
Bernold, L E (1985) Productivity transients in construction processes. PhD thesis, Georgia Institute of Technology, USA.
Bernold, L E and Treseler, J F (1991) Vendor analysis for best buy in construction. Journal of Construction Engineering and Management, 117(4), pp. 645-658. ISSN 0733-9364
Berny, J (1988) Forecasting and risk analysis applied to management planning and control. PhD thesis, Aston University, UK.
Besiktepe, D; Sparkling, A; Debs, L and Manuel, R (2024) Digital technology applications in construction education: A systematic review of methodological pluralism. International Journal of Construction Education and Research, 20(4), pp. 421-443. ISSN 1557-8771
Bettemir, Ö H and Birgonul, M T (2025) Solution of discrete time–cost trade-off problem with adaptive search domain. Engineering, Construction and Architectural Management, 32(2), pp. 1032-1052. ISSN 0969-9988
Betts, M P (1987) Coordinated information retrieval for building contractors' tendering. PhD thesis, Polytechnic of the South Bank, UK.
Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.
Bhargava, A; Anastasopoulos, P C; Labi, S; Sinha, K C and Mannering, F L (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), pp. 1207-1218. ISSN 0733-9364
Bhat, V S; Indiran, T; Selvanathan, S P and Bhat, S (2025) Designing multivariable pi controller with multi-response optimization for a pilot plant binary distillation column: A robust design approach. Journal of Engineering, Design and Technology, 23(1), pp. 207-227. ISSN 1726-0531
Bhatia, A; Moselhi, O and Han, S (2025) Hybrid optimization approach for scheduling in panelized construction manufacturing. Journal of Construction Engineering and Management, 151(8): 04025107, ISSN 0733-9364
Bhaumik, P K (2016) Developing and using a new family of project S-curves using early and late shape parameters. Journal of Construction Engineering and Management, 142(12): 04016076, ISSN 0733-9364
Bhavsar, V; Thomas Alex, S; Vaishnav, P K; Jose, A; Koshy, N G and Atiwadkar, S (2022) Investigation of critical factors influencing construction of airports: The case of India. International Journal of Construction Management, 22(15), pp. 2905-2913. ISSN 1562-3599
Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.
Bhih, M and Hegazy, T (2021) Enhanced but-for method to apportion net delays and accelerations. Journal of Construction Engineering and Management, 147(7): 06021003, ISSN 0733-9364
Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(4), pp. 686-696. ISSN 1562-3599
Bhokha, S and Ogunlana, S O (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering, Construction and Architectural Management, 6(2), pp. 133-144. ISSN 0969-9988
Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364
Bigelow, B F (2012) Perceived positive and negative effects of participation in student construction management competitions: A qualitative priority mixed methods study. PhD thesis, Colorado State University, USA.
Bigelow, B F; Glick, S and Aragon, A (2013) Participation in construction management student competitions: Perceived positive and negative effects. International Journal of Construction Education and Research, 9(4), pp. 272-287. ISSN 1557-8771
Bigolin, M; Bussular, C Z and Silva Filho, L C P (2021) Evolutionary resilience in the housing sector: Requirements proposal. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 1-12. ISSN 1759-5916
Bilge, E Ç and Yaman, H (2022) Research trends analysis using text mining in construction management: 2000–2020. Engineering, Construction and Architectural Management, 29(8), pp. 3210-3233. ISSN 0969-9988
Bingham, E (2014) Analysis of the state of practice and best practices for alternative project delivery methods in the transportation design and construction industry. PhD thesis, Arizona State University, USA.
Bingham, E; Gibson, G E and Asmar, M E (2018) Measuring user perceptions of popular transportation project delivery methods using least significant difference intervals and multiple range tests. Journal of Construction Engineering and Management, 144(6): 04018033, ISSN 0733-9364
Bingol, B N; Arditi, D and Polat, G (2024) A performance-based subcontractor selection model. Journal of Construction Engineering and Management, 150(8): 04024079, ISSN 0733-9364
Bingol, B N; Arditi, D and Polat, G (2025) Subcontractor selection for a construction project: Optimal plan. Journal of Construction Engineering and Management, 151(12): 04025205, ISSN 0733-9364
Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.
Bird, R and Wearne, S (2017) Contract structure for nuclear power projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 131-137. ISSN 17514304
Birgonul, M T; Dikmen, I and Bektas, S (2015) Integrated approach to overcome shortcomings in current delay analysis practices. Journal of Construction Engineering and Management, 141(4): 04014088, ISSN 0733-9364
Birrell, G S (1985) General contractors' management: How subs evaluate it. Journal of Construction Engineering and Management, 111(3), pp. 244-259. ISSN 0733-9364
Birrell, George Selbie (1978) The criteria by which construction prime and subcontractors evaluate the management performance of each other. DArch thesis, University of Michigan, USA.
Biswas, A (2019) Exploring Indian post-disaster temporary housing strategy through a comparative review. International Journal of Disaster Resilience in the Built Environment, 10(1), pp. 14-35. ISSN 1759-5916
Biswas, P K; Khan, S M; Piratla, K and Chowdhury, M (2023) Development and evaluation of statistical and machine-learning models for queue-length estimation for lane closures in freeway work zones. Journal of Construction Engineering and Management, 149(5): 04023023, ISSN 0733-9364
Biziorek, S; De Marco, A and Castelblanco, G (2023) Public-private partnership national programs through the portfolio perspective: A system dynamics model of the UK PFI/PF2 programs. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(2), pp. 200-211. ISSN 1471-4175
Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. PhD thesis, Abertay University, UK.
Blackwood, D J; Sarkar, S and Price, A D F (1997) A research methodology for modelling construction design service costs. Journal of Construction Procurement, 3(3), pp. 47-67. ISSN 1358-9180
Blackwood, D J; Sarkar, S and Price, A D F (1998) Modelling levels of accuracy in design cost estimation. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Blacud, N A; Bogus, S M; Diekmann, J E and Molenaar, K R (2009) Sensitivity of construction activities under design uncertainty. Journal of Construction Engineering and Management, 135(3), pp. 199-206. ISSN 0733-9364
Blakey, L H (1990) Bar codes: Prescription for precision, performance, and productivity. Journal of Construction Engineering and Management, 116(3), pp. 468-479. ISSN 0733-9364
Blismas, N; Sher, W; Thorpe, A and Baldwin, A (2004) A typology for clients' multi-project environments. Construction Management and Economics, 22(4), pp. 357-371. ISSN 01446193
Blismas, N G (2001) Multi project environments of construction clients. PhD thesis, Loughborough University, UK.
Blismas, N G; Sher, W and Thorpe, A (1998) National and global multi-site projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Blismas, N G; Sher, W and Thorpe, A (1999) The nature and characteristics of multi-site construction projects and programmes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Blomberg, D; Cotellesso, P; Sitzabee, W and Thal, A E (2014) Discovery of internal and external factors causing military construction cost premiums. Journal of Construction Engineering and Management, 140(3): 4013060, ISSN 0733-9364
Blomgren, S (2003) Changes to building research funding in Sweden. Building Research & Information, 31(6), pp. 474-478. ISSN 0961-3218
Bloore, R D S (1991) The ascertainment of claims for delay and disruption. PhD thesis, University of Surrey, UK.
Blyth, K and Kaka, A (2006) A novel multiple linear regression model for forecasting S-curves. Engineering, Construction and Architectural Management, 13(1), pp. 82-95. ISSN 0969-9988
Blyth, K; Lewis, J and Kaka, A (2004) Developing a framework for a standardized works programme for building projects. Construction Innovation, 4(4), pp. 193-210. ISSN 1471-4175
Blyth, K; Lewis, J and Kaka, A (2004) Predicting project and activity duration for buildings in the UK. Journal of Construction Research, 5(2), pp. 329-347. ISSN 1609-9451
Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.
Boakye Danquah, C; Acheampong, A and Adjei-Kumi, T (2022) Level of awareness of formwork design in the Ghanaian construction industry; enabling future technology application. Journal of Engineering, Design and Technology, 20(4), pp. 1015-1039. ISSN 1726-0531
Boateng, P (2014) A dynamic systems approach to risk assessment in megaprojects. PhD thesis, Heriot-Watt University, UK.
Boateng, P; Ahiaga-Dagbui, D; Chen, Z and Ogunlana, S (2015) Modelling economic risks in megaproject construction: A systemic approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Boateng, P; Omotayo, T; Osunsanmi, T and Ekundayo, D (2025) Socio-ecological risks management dynamic simulation in megaproject development of the edinburgh tram network. International Journal of Building Pathology and Adaptation, 43(1), pp. 75-92. ISSN 2398-4708
Boes, H and Dorée, A (2008) Public procurement of local authorities in the Netherlands: A case of breaking tradition for a more strategic approach? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Bogus, S M (2004) Concurrent engineering strategies for reducing design delivery time. PhD thesis, University of Colorado at Boulder, USA.
Bogus, S M; Diekmann, J E; Molenaar, K R; Harper, C; Patil, S and Lee, J S (2011) Simulation of overlapping design activities in concurrent engineering. Journal of Construction Engineering and Management, 137(11), pp. 950-957. ISSN 0733-9364
Bogus, S M; Molenaar, K R and Diekmann, J E (2005) Concurrent engineering approach to reducing design delivery time. Journal of Construction Engineering and Management, 131(11), pp. 1179-1185. ISSN 0733-9364
Boissonneault, A and Peters, T (2024) An exploration of post-occupancy evaluation in Canada: Origins, milestones and next steps. Building Research & Information, 52(3), pp. 332-357. ISSN 0961-3218
Bologna, R and Del Nord, R (2000) Effects of the law reforming public works contracts on the Italian building process. Building Research & Information, 28(2), pp. 109-118. ISSN 0961-3218
Bon, R (1988) Replacement simulation model: A framework for building portfolio decisions. Construction Management and Economics, 6(2), pp. 149-159. ISSN 01446193
Bondin, I (2022) Inter-organisational relationships in construction projects: an analysis of inter-organisational relationships over time through the theoretical lens of trust and power. PhD thesis, Loughborough University, UK.
Bonev, M; Wörösch, M and Hvam, L (2015) Utilizing platforms in industrialized construction: A case study of a precast manufacturer. Construction Innovation, 15(1), pp. 84-106. ISSN 1471-4175
Bonham, M B (2013) Leading by example: New professionalism and the government client. Building Research & Information, 41(1), pp. 77-94. ISSN 0961-3218
Bonnal, P; Gourc, D; Hameri, A P and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(8), pp. 797-814. ISSN 01446193
Bonnal, P; Gourc, D and Lacoste, G (2004) Where do we stand with fuzzy project scheduling? Journal of Construction Engineering and Management, 130(1), pp. 114-123. ISSN 0733-9364
Bonnar, I D (2007) Not as cool as fighter pilots: an exploration of identity and learning for full-time quantity surveying students. EdD thesis, University of Stirling, UK.
Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective. PhD thesis, University of Wisconsin - Madison, USA.
Boothman, J C; Higham, A and Horsfall, B (2012) Attaining zero defects within building schools for the future: A realistic target or a sisyphean task? In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Boothman C, H A (2013) Attaining zero defects within the UK's building schools for the future programme: Stakeholders' perceptions. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Bordoli, D W and Baldwin, A N (1998) A methodology for assessing construction project delays. Construction Management and Economics, 16(3), pp. 327-337. ISSN 01446193
Borg, R P; Borg Axisa, G; Ophiyandri, T and Hakam, A (2020) The development of inter-regional and intra-regional cooperation frameworks for multi-hazard early warning systems in South and South-East Asia. International Journal of Disaster Resilience in the Built Environment, 12(3), pp. 265-279. ISSN 1759-5916
Borges, W F and Mário, P D C (2017) Five project-duration control methods in time units: Case study of a linearly distributed planned value. Journal of Construction Engineering and Management, 143(6): 05017002, ISSN 0733-9364
Boroujeni, K A (2023) Visual data analytic and robotics for automated construction performance monitoring. PhD thesis, North Carolina State University, USA.
Bosche, F N (2008) Automated recognition of three-dimensional CAD model objects in dense laser range point clouds. PhD thesis, University of Waterloo, Canada.
Bosché, F; Turkan, Y; Haas, C T and Haas, R (2010) Fusing 4D modelling and laser scanning for construction schedule control. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Bosher, L; Dainty, A; Carrillo, P; Glass, J and Price, A (2007) Towards a protocol for built-in resilience to disasters. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Botha, P S and Scheepbouwer, E (2015) Christchurch rebuild, New Zealand: Alliancing with a difference. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 121-129. ISSN 17514304
Bouchlaghem, D; Shang, H; Anumba, C J; Cen, M; Miles, J and Taylor, M (2005) ICT-enabled collaborative working environment for concurrent conceptual design. Architectural Engineering and Design Management, 1(4), pp. 261-280. ISSN 1745-2007
Boukendour, S and Bah, R (2001) The guaranteed maximum price contract as call option. Construction Management and Economics, 19(6), pp. 563-567. ISSN 01446193
Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.
Boussabaine, A H (2001) Neurofuzzy modelling of construction projects' duration I: Principles. Engineering, Construction and Architectural Management, 8(2), pp. 104-113. ISSN 0969-9988
Boussabaine, A H (2001) Neurofuzzy modelling of construction projects' duration ii: Application. Engineering, Construction and Architectural Management, 8(2), pp. 114-129. ISSN 0969-9988
Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218
Bowden, S L (2005) Application of mobile IT in construction. EngD thesis, Loughborough University, UK.
Bowen, P; Allen, Y; Edwards, P; Cattell, K and Simbayi, L (2014) Guidelines for effective workplace HIV/AIDS intervention management by construction firms. Construction Management and Economics, 32(4), pp. 362-381. ISSN 01446193
Bowen, P; Dorrington, R; Distiller, G; Lake, H and Besesar, S (2008) HIV/AIDS in the South African construction industry: An empirical study. Construction Management and Economics, 26(8), pp. 827-839. ISSN 01446193
Bowen, P; Edwards, P and Lingard, H (2013) Workplace stress among construction professionals in South Africa the role of harassment and discrimination. Engineering, Construction and Architectural Management, 20(6), pp. 620-635. ISSN 0969-9988
Bowen, P; Edwards, P; Simbayi, L and Cattell, K (2013) HIV/AIDS interventions by construction firms in the Western cape, South Africa: A thematic analysis of qualitative survey data. International Journal of Construction Management, 13(4), pp. 11-33. ISSN 1562-3599
Bowen, P; Govender, R and Edwards, P (2014) Structural equation modeling of occupational stress in the construction industry. Journal of Construction Engineering and Management, 140(9): 04014042, ISSN 0733-9364
Bowen, P; Jay, I; Cattell, K and Edwards, P (2010) Value management awareness and practice by South African architects: An empirical study. Construction Innovation, 10(2), pp. 203-222. ISSN 1471-4175
Bowen, P and Zhang, R P (2020) Cross-boundary contact, work-family conflict, antecedents, and consequences: Testing an integrated model for construction professionals. Journal of Construction Engineering and Management, 146(3): 04020005, ISSN 0733-9364
Bowen, R M (1978) Valuation of capitalized interest on construction expenditures in the electric utility industry. PhD thesis, Stanford University, USA.
Bower, D A (1995) The creation of a proactive link between time and money. PhD thesis, University of Manchester, UK.
Bowes, D and Arnold, S (2009) The engineering and construction contract and its implications for project programming procedures. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(1), pp. 60-74. ISSN 0969-9988
Bowron, J (2002) Re-engineering the project procurement process through concurrent engineering. PhD thesis, Loughborough University, UK.
Boyacioglu, S E; Greenwood, D; Rogage, K; Gledson, B; Parry, A and Hinds, M (2022) Developing an improved process model for forensic analysis of construction project delays. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Boyal-Seth, H (2011) Assessing the business case for supplier diversity in the construction housing sector. PhD thesis, Nottingham Trent University, UK.
Boyd, D and Fellowes, J (2018) The problem of evaluating 'value for money' of school building programmes. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Boyd, D and Foss, P (1997) Developing intimacy in construction industry groups. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Boylan, A (2020) A study of the transfer of tacit knowledge by a monitored tutelage programme for quantity surveyors. PhD thesis, University of Salford, UK.
Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems. PhD thesis, University of California, Berkeley, USA.
Boznos, D (1998) The use of computerised maintenance management systems to support team-based maintenance. PhD thesis, Cranfield University, UK.
Br chner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(2), pp. 91-101. ISSN 0969-9988
Brady, D A (2014) Using visual management to improve transparency in planning and control in construction. PhD thesis, University of Salford, UK.
Brady, D A; Tzortzopoulos, P; Rooke, J; Formoso, C T and Tezel, A (2018) Improving transparency in construction management: A visual planning and control model. Engineering, Construction and Architectural Management, 25(10), pp. 1277-1297. ISSN 0969-9988
Brady, L (2019) An investigation into the management of energy performance for building services systems: design to operation. PhD thesis, Liverpool John Moores University, UK.
Brady, M (1991) Growing a housebuilder: Investigating a context for learning and modeling principles of transpersonal psychology. PhD thesis, Institute of Transpersonal Psychology, USA.
Bragadin, M A and Kähkönen, K (2016) Schedule health assessment of construction projects. Construction Management and Economics, 34(12), pp. 875-897. ISSN 01446193
Braimah, N (2008) An investigation into the use of construction delay and disruption analysis methodologies. PhD thesis, University of Wolverhampton, UK.
Braimah, N and Ndekugri, I (2009) Consultants' perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. ISSN 0733-9364
Brambilla, A; Candido, C; Sangiorgio, M F; Gocer, O and Gocer, K (2021) Can commercial buildings cope with Australian bushfires? An IAQ analysis. Buildings & Cities, 2(1), pp. 583-598. ISSN 2632-6655
Brandon, P S (1990) The development of an expert system for the strategic planning of construction projectss. Construction Management and Economics, 8(3), pp. 285-300. ISSN 01446193
Bresnen, M; Lennie, S J and Marshall, N (2025) Partnering in construction re-visited: Gauging progress in industry practice and prospects for advances in academic research. Construction Management and Economics, 43(1), pp. 59-77. ISSN 0144-6193
Brett, R; Thomson, D and Dainty, A (2022) Exploring craft in construction with short-term ethnography: Reflections on a researcher's prior insight. Construction Management and Economics, 40(5), pp. 359-373. ISSN 01446193
Bridgeman, J (2024) Can panoptic school infrastructure lead to disruptive and dangerous student behaviour which makes schools unsafe. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Bridgeman, J and Loosemore, M (2021) Designing theoretically and evidence-based social procurement programmes in construction: A capability empowerment approach. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Bridgeman, J; Maple, P; Murdock, A; Hardy, S and Townley, C (2016) Demonstrating the social value of a schools engagement programme: Introducing young people to the construction professions. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Brilakis, I and Soibelman, L (2006) Multimodal image retrieval from construction databases and model-based systems. Journal of Construction Engineering and Management, 132(7), pp. 777-785. ISSN 0733-9364
Broadhurst, S J (2000) Non-man-entry sewer renovation robot characteristics. PhD thesis, Sheffield Hallam University, UK.
Brodetskaia, I; Sacks, R and Shapira, A (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics, 29(12), pp. 1209-1227. ISSN 1466433X
Brown, S and Walker, G (2008) Understanding heat wave vulnerability in nursing and residential homes. Building Research & Information, 36(4), pp. 363-372. ISSN 0961-3218
Browne, M (2007) Towards a thematic approach to research within a taught postgraduate programme in construction and project management: A Northern Ireland context. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Browning, F R (1994) Planning system for hazardous waste site characterization. PhD thesis, University of Missouri - Rolla, USA.
Bruce-Konuah, A; Jones, R V and Fuertes, A (2023) A method for estimating scheduled and manual override heating behaviour and settings from measurements in low energy UK homes. International Journal of Building Pathology and Adaptation, 41(1), pp. 25-44. ISSN 23984708
Bryde, D J (2008) Is construction different? A comparison of perceptions of project management performance and practices by business sector and project type. Construction Management and Economics, 26(3), pp. 315-327. ISSN 1466433X
Bryde, D J and Schulmeister, R (2012) Applying lean principles to a building refurbishment project: Experiences of key stakeholders. Construction Management and Economics, 30(9), pp. 777-794. ISSN 1466433X
Bröchner, J and Lagerqvist, O (2016) From ideas to construction innovations: Firms and universities collaborating. Construction Economics and Building, 16(1), pp. 76-89. ISSN 2204-9029
Bröchner, J and Sjöström, C (2003) Quality and coordination: Internationalizing Swedish building research. Building Research & Information, 31(6), pp. 479-484. ISSN 0961-3218
Bu-Bushait, K A (1984) A descriptive examination of the relationships between the application of project management techniques and project characteristics. PhD thesis, Georgia State University, USA.
Bubshait, A A and Cunningham, M J (1998) Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), pp. 315-322. ISSN 0733-9364
Bubshait, A A and Tahir, B M (1996) Planning and scheduling concrete repair work: a case study. Building Research & Information, 24(6), pp. 363-368. ISSN 0961-3218
Buckingham, H (2010) Accommodating change? An investigation of the impacts of government contracting processes on third sector providers of homelessness services in South East England. PhD thesis, University of Southampton, UK.
Budayan, C; Koc, K; Erk, E Y and Tokdemir, O B (2025) Uncovering value creation factors for healthcare public-private partnership (PPP) projects. Engineering, Construction and Architectural Management, 32(8), pp. 5456-5483. ISSN 0969-9988
Buertey, J T; Dadadzogbor, E and Atsrim, F (2021) Procurement path influencing factors in Ghana: Managing the challenge of cultural shift. International Journal of Construction Management, 21(1), pp. 78-92. ISSN 1562-3599
Bugg, R A and Redden, L W (2020) Assessment and improvement of a required construction management service-learning course. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Buhamizo, I; Muhwezi, L and Sengonzi, R (2023) A regression model to enhance the profitability of local construction contractors in Uganda. Journal of Construction in Developing Countries, 28(1), pp. 221-241. ISSN 1823-6499
Bukari, C; Kheni, N A; Boateng, I; Owusu-Ansah, C M and Simpson, K B (2026) Integrating knowledge management with total quality management to enhance construction project delivery in Ghana. Construction Economics and Building, 26(1), ISSN 2204-9029
Burfoot, M; GhaffarianHoseini, A; Ghaffarianhoseini, A and Naismith, N (2024) Passive variable acoustic technology for classroom reverberation time: A case study. Smart and Sustainable Built Environment, 13(6), pp. 1450-1472. ISSN 2046-6099
Burford, N K and Smith, F W (1999) Developing a new military shelter system: A case study in innovation. Building Research & Information, 27(1), pp. 35-55. ISSN 0961-3218
Burgett, J M and Chini, A R (2013) Effective energy efficiency measures for existing residential homes in the Florida market. International Journal of Construction Education and Research, 9(1), pp. 61-80. ISSN 1557-8771
Burleson, R C (1997) An analysis of multiskilled labor strategies in construction. PhD thesis, University of Texas at Austin, USA.
Burleson, R C; Haas, C T; Tucker, R L and Stanley, A (1998) Multiskilled labor utilization strategies in construction. Journal of Construction Engineering and Management, 124(6), pp. 480-489. ISSN 0733-9364
Burman, E (2016) Assessing the operational performance of educational buildings against design expectations: a case study approach. PhD thesis, University College London, UK.
Burnard, M D and Kutnar, A (2020) Human stress responses in office-like environments with wood furniture. Building Research & Information, 48(3), pp. 316-330. ISSN 0961-3218
Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193
Burns, T M (2007) The effect of selected request for information variables on steel fabrication outcomes. PhD thesis, Indiana State University, USA.
Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences. PhD thesis, University of South Wales, UK.
Butcher, D C A and Sheehan, M J (2010) Excellent contractor performance in the UK construction industry. Engineering, Construction and Architectural Management, 17(1), pp. 35-45. ISSN 0969-9988
Bynum, P; Issa, R R A and Olbina, S (2013) Building information modeling in support of sustainable design and construction. Journal of Construction Engineering and Management, 139(1), pp. 24-34. ISSN 0733-9364
Büchmann-Slorup, R (2014) Applying critical chain buffer management theory in location-based management. Construction Management and Economics, 32(6), pp. 506-519. ISSN 01446193
Büsch, M P (2013) The role of procurement professionals in industrial projects: organisation, roles, and tasks for professional project procurement. PhD thesis, University of Gloucestershire, UK.
C.R, A; Murali, S; Haq, M A; Bysani, T N and Narahari, N S (2023) Exoskeleton for lower extremities based on Indian anthropomorphism with gait allowance: Design and development. Journal of Engineering, Design and Technology, 21(5), pp. 1343-1372. ISSN 1726-0531
Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.
Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988
Caldas, C H; Chou, C C and O'Connor, J (2008) Negotiation-based decision support model for utility relocations in transportation infrastructure projects. Construction Management and Economics, 26(10), pp. 1079-1090. ISSN 1466433X
Caldas, C H; Torrent, D G and Haas, C T (2006) Using global positioning system to improve materials-locating processes on industrial projects. Journal of Construction Engineering and Management, 132(7), pp. 741-749. ISSN 0733-9364
Caldwell, Scott A (2024) Empirical decision-making tools as applied to seaports in the industry 4.0 paradigm. PhD thesis, Liverpool John Moores University, UK.
Callaghan, N and Marcano-Salcedo, M (2020) A study of the housing needs of residents in informal settlements in the Dominican Republic. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Calvert, J; Price, V; Winch, C; Clarke, L; Sahin-Dikmen, M; Bilodeau, P L and Dionne, E (2026) Climate literacy and labour agency in vocational education and training. Buildings & Cities, 7(1), pp. 378-395. ISSN 2632-6655
Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.
Calzadilla, E; Awinda, K and Parkin, A (2012) An examination of the risk management process in Venezuelan construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Cameron, I and Hare, B (2008) Planning tools for integrating health and safety in construction. Construction Management and Economics, 26(9), pp. 899-909. ISSN 1466433X
Campbell, M A and Gunning, J G (2020) Strategies to improve mental health and well-being within the UK construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(2), pp. 64-74. ISSN 17514304
Cancian, Glen A (2016) Heuristic based optimisation of pavement management scheduling. PhD thesis, Griffith University, Australia.
Candel, M; Karrbom Gustavsson, T and Eriksson, P E (2021) Front-end value co-creation in housing development projects. Construction Management and Economics, 39(3), pp. 245-260. ISSN 01446193
Cantarelli, C C (2011) Cost overruns in large-scale transport infrastructure projects: A theoretical and empirical exploration for the Netherlands and worldwide. PhD thesis, Delft University of Technology, Netherlands.
Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364
Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364
Cao, W (2019) Data interpretation for infrastructure system diagnosis and prognosis based on model falsification. PhD thesis, National University of Singapore, Singapore.
Caprario, Rick (2025) Interpersonal communication, relationships, and collaboration among construction specialty contractor project management professionals: A single case study. EdD thesis, Baylor University, USA.
Cardellino, P; Leiringer, R and Clements-Croome, D (2009) Exploring the role of design quality in the Building Schools for the Future programme. Architectural Engineering and Design Management, 5(4), pp. 249-262. ISSN 1745-2007
Carmichael, S and Murray, M (2006) Record keeping for contemporaneous delay analysis: A model for effective event management. Construction Management and Economics, 24(10), pp. 1007-1018. ISSN 1466433X
Carmo, Cristiano Saad Travassos do (2023) A hybrid solution using stochastic and neural networks modeling for the consideration of safety uncertainties in construction planning methods. PhD thesis, Pontifícia Universidade Católica do Rio de Janeiro, Brazil.
Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.
Carpenter, W J (2004) Design and construction in architectural education: 1963-2003. PhD thesis, Birmingham City University, UK.
Carr, R I (1993) Cost, schedule, and time variances and integration. Journal of Construction Engineering and Management, 119(2), pp. 245-265. ISSN 0733-9364
Carroll, L C (2024) Framework to develop a credible final accounts system for South African construction projects. PhD thesis, University of Pretoria, South Africa.
Carter, K and Fortune, C (2007) Sustainable development policy perceptions and practice in the UK social housing sector. Construction Management and Economics, 25(4), pp. 399-408. ISSN 1466433X
Castillo, T; Alarcón, L F and Salvatierra, J L (2018) Effects of last planner system practices on social networks and the performance of construction projects. Journal of Construction Engineering and Management, 144(3): 04017120, ISSN 0733-9364
Castillo Campoverde, T O (2018) Multidimensional analysis of the interaction between the organization, management pratices and performance in construction. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.
Castro, I; Galán, J L and Casanueva, C (2009) Antecedents of construction project coalitions: A study of the Spanish construction industry. Construction Management and Economics, 27(9), pp. 809-822. ISSN 1466433X
Castro-Lacouture, D; Süer, G A; Gonzalez-Joaqui, J and Yates, J K (2009) Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method. Journal of Construction Engineering and Management, 135(10), pp. 1096-1104. ISSN 0733-9364
Cates, G R (2004) Improving project management with simulation and completion distribution functions. PhD thesis, University of Central Florida, USA.
Caven, V and Raidén, A B (2010) Work-life balance among architects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Celoza, A; De Oliveira, D P and Leite, F (2023) Qualitative analysis of the impact of contracts on information management in AEC projects. Journal of Construction Engineering and Management, 149(3): 04022185, ISSN 0733-9364
Celoza, Amelia McLean (2022) The impact of contractual and legal factors on information management in AEC project delivery. PhD thesis, University of Texas at Austin, USA.
Cepeda, D M; Sohail, M and Ogunlowo, O O (2018) Understanding the critical success factors for delivery of megaprojects in Colombia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 45-57. ISSN 17514304
Ceric, A (2003) A framework for process-driven risk management in construction projects. PhD thesis, University of Salford, UK.
Cevikbas, M and Işık, Z (2023) Detecting the most appropriate delay analysis methods for mega airport projects. Engineering, Construction and Architectural Management, 30(6), pp. 2463-2480. ISSN 0969-9988
Chai, C S; Yusof, A M and Habil, H (2015) Delay mitigation in the Malaysian housing industry: A structural equation modelling approach. Journal of Construction in Developing Countries, 20(1), pp. 65-83. ISSN 1823-6499
Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Champion, R (2005) Acceleration in construction and engineering contracts. PhD thesis, University of London, UK.
Chan, A P C; Chan, M W; Oppong, G D; Adabre, M A; Darko, A and Liu, W (2025) Developing a project surveillance system to monitor and control building projects: The case of Hong Kong. International Journal of Construction Management, 25(16), pp. 1952-1967. ISSN 1562-3599
Chan, A P; Ho, D C K and Tam, C M (2001) Design and build: Views from some major public clients in Hong Kong. Construction Economics and Building, 1(1), pp. 22-31. ISSN 2204-9029
Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(2), pp. 189-196. ISSN 01446193
Chan, A P C; Chiang, Y H; Mak, S W K; Choy, L H T and James, M W W (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(1), pp. 3-19. ISSN 1471-4175
Chan, A P C; Chiang, Y H; Wong, F K W; Liang, S and Abidoye, F A (2020) Work-life balance for construction manual workers. Journal of Construction Engineering and Management, 146(5): 04020031, ISSN 0733-9364
Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364
Chan, A P L; Chan, A P C and Chan, D W M (2003) A study of managing healthcare projects in Hong Kong. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.
Chan, C T W and Sher, W (2014) Exploring AEC education through collaborative learning. Engineering, Construction and Architectural Management, 21(5), pp. 532-550. ISSN 0969-9988
Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.
Chan, D W M and Kumaraswamy, M M (1995) A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics, 13(4), pp. 319-333. ISSN 01446193
Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), pp. 351-362. ISSN 01446193
Chan, E H W and Au, M C Y (2008) Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations. Journal of Construction Engineering and Management, 134(9), pp. 673-680. ISSN 0733-9364
Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chan, P (2012) Constructing a sense of time in projects: Implications of a bergsonian view of time. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Chan, P L (2004) Critical success factors for delivering healthcare projects in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chan, P W (2005) An interpretivistic approach to understand the factors that affect construction labour productivity. PhD thesis, Heriot-Watt University, UK.
Chan, P W (2016) Expert knowledge in the making: Using a processual lens to examine expertise in construction. Construction Management and Economics, 34(7-8), pp. 471-483. ISSN 01446193
Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364
Chan, W T; Chua, D K H and Kannan, G (1996) Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, 122(2), pp. 125-132. ISSN 0733-9364
Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364
Chan, W T P (2009) Construction industry development and government policy. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chand, Shelvin (2018) Automated design of heuristics for the resource constrained project scheduling problem. PhD thesis, University of New South Wales, Australia.
Chanda, E K and Gardiner, S (2010) A comparative study of truck cycle time prediction methods in open-pit mining. Engineering, Construction and Architectural Management, 17(5), pp. 446-460. ISSN 0969-9988
Chang, A S T and Tsai, Y W (2003) Engineering information classification system. Journal of Construction Engineering and Management, 129(4), pp. 454-460. ISSN 0733-9364
Chang, C J and Yu, S W (2018) Three-variance approach for updating earned value management. Journal of Construction Engineering and Management, 144(6): 04018045, ISSN 0733-9364
Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364
Chang, C K and Sullivan, K T (2006) Workload ratio as an indicator of schedule acceleration and its relationship with labour efficiency. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Chang, T C; William, C and Crandall, K C (1990) Network resource allocation with support of a fuzzy expert system. Journal of Construction Engineering and Management, 116(2), pp. 239-260. ISSN 0733-9364
Chang, T-C (1987) Network resource allocation using an expert system with fuzzy logic reasoning. PhD thesis, University of California, Berkeley, USA.
Chang, Y; Wilkinson, S; Potangaroa, R and Seville, E (2011) Identifying factors affecting resource availability for post-disaster reconstruction: A case study in China. Construction Management and Economics, 29(1), pp. 37-48. ISSN 1466433X
Chang, Y; Wilkinson, S; Seville, E and Potangaroa, R (2010) Resourcing for a resilient post-disaster reconstruction environment. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 65-83. ISSN 1759-5916
Chang, Y P (2020) Construction worker safety and accident prevention in Taiwan. PhD thesis, University of Bristol, UK.
Changwang, S; Shaowei, H; Haifen, Z; Fuqu, P; Changxi, S and Hao, Q (2024) Automatic detection of water supply pipe defects based on underwater image enhancement and improved yolox. Journal of Construction Engineering and Management, 150(10): 04024134, ISSN 0733-9364
Chantawit, D; Hadikusumo, B H W; Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: Visualizing project scheduling and safety planning. Construction Innovation, 5(2), pp. 99-114. ISSN 1471-4175
Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X
Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364
Chao, Q; Rotimi, F E and Rotimi, J O B (2021) International construction joint ventures as a resourcing model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 28-37. ISSN 17514304
Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts. PhD thesis, Indian Institute of Technology Delhi, India.
Chapman, R J (1998) An investigation of the risk of changes to key project personnel during the design stage. PhD thesis, University of Reading, UK.
Chapman, R J (1999) The likelihood and impact of changes of key project personnel on the design process. Construction Management and Economics, 17(1), pp. 99-106. ISSN 01446193
Charles, S P R; Wanigarathna, N and Sherratt, F (2015) Construction project change: Investigating cost and benefits. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Charlesraj, V P C; Maheswari, J U; Kalidindi, S N and Varghese, K (2004) Knowledge management for planning construction projects using dependency structure matrix. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Charlson, J (2014) Law for engineering undergraduates on accredited courses 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), pp. 201-206. ISSN 17514304
Charoenngam, C; Coquinco, S T and Hadikusumo, B H W (2003) Web-based application for managing change orders in construction projects. Construction Innovation, 3(4), pp. 197-215. ISSN 1471-4175
Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction. PhD thesis, George Washington University, USA.
Chasey, A D and Merchant, S (2000) Issues for construction of 300-mm fab. Journal of Construction Engineering and Management, 126(6), pp. 451-457. ISSN 0733-9364
Chassiakos, A P and Sakellaropoulos, S P (2005) Time-cost optimization of construction projects with generalized activity constraints. Journal of Construction Engineering and Management, 131(10), pp. 1115-1124. ISSN 0733-9364
Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364
Chaudhari, R; Goodrum, P; Brady, N; Jones, M; Hallowell, M; Yeh, T and Bhandari, S (2025) Exploring the impact of augmented reality on work performance in a full-scale MEP assembly task: Study of industry and novice populations. Journal of Construction Engineering and Management, 151(12): 04025189, ISSN 0733-9364
Che Haron, R (2017) Systems thinking paradigm in construction cost estimating reliability. PhD thesis, University of Reading, UK.
Cheetham, D W and Banfill, P F G (1980) An unusual case of delayed sulphate attack to concrete floor slabs. Construction Papers, 1(1), pp. 7-16. ISSN 0144-8587
Chehayeb, N N (1996) Simulation-based project control. PhD thesis, University of Alberta, Canada.
Chehayeb, N N and AbouRizk, S M (1998) Simulation-based scheduling with continuous activity relationships. Journal of Construction Engineering and Management, 124(2), pp. 107-115. ISSN 0733-9364
Chellappa, V and Ginda, G (2023) Application of multiple-criteria decision making methods for construction safety research. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 127-136. ISSN 17514304
Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988
Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988
Chen, B; Yu, X; Dong, F; Zheng, C; Ding, G and Wu, W (2021) Compaction quality evaluation of asphalt pavement based on intelligent compaction technology. Journal of Construction Engineering and Management, 147(9): 04021099, ISSN 0733-9364
Chen, C (2015) A proactive approach for change management and control on construction projects. PhD thesis, University of California, Berkeley, USA.
Chen, C (2016) Crane planning optimization for construction. PhD thesis, National University of Singapore, Singapore.
Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.
Chen, C and Messner, J I (2010) A recommended practices system for a global virtual engineering team. Architectural Engineering and Design Management, 6(3), pp. 207-221. ISSN 1745-2007
Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988
Chen, G (2023) Enhance collaboration reliability at task level for construction projects using blockchain technology. PhD thesis, North Carolina State University, USA.
Chen, G X; Shan, M; Chan, A P C; Liu, X and Zhao, Y Q (2019) Investigating the causes of delay in grain bin construction projects: The case of China. International Journal of Construction Management, 19(1), pp. 1-14. ISSN 1562-3599
Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364
Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364
Chen, J H; Hayati, D W; Su, Y M; Wijatmiko, I and Purnamasari, R (2019) Improving preliminary cost estimation in Indonesia using support vector regression. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 25-33. ISSN 17514304
Chen, J H; Su, M C and Huang, D Y (2010) Application of a SOM-based optimization algorithm in minimizing construction time for secant pile wall. Journal of Construction Engineering and Management, 136(11), pp. 1189-1195. ISSN 0733-9364
Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193
Chen, J J and Wills, D (1997) Development of urban housing policies in China. Construction Management and Economics, 15(3), pp. 283-290. ISSN 01446193
Chen, Jamie (2025) Improving construction supply chain material management resilience through mathematical optimisation. PhD thesis, University of New South Wales, Australia.
Chen, L (2019) An integrated construction schedule risk analysis approach for infrastructure projects under uncertainty. PhD thesis, University of Hong Kong, Hong Kong.
Chen, L; Zhang, J and Peng, W (2022) Research on the hierarchical discrete time-cost trade-off problem for program. Journal of Construction Engineering and Management, 148(7): 04022039, ISSN 0733-9364
Chen, Q; Adey, B T; Haas, C and Hall, D M (2020) Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies. Construction Innovation, 20(3), pp. 471-508. ISSN 1471-4175
Chen, Q; Adey, B T; Haas, C T and Hall, D M (2022) Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation, 22(1), pp. 76-100. ISSN 1471-4175
Chen, Q; Hall, D M; Adey, B T and Haas, C T (2021) Identifying enablers for coordination across construction supply chain processes: A systematic literature review. Engineering, Construction and Architectural Management, 28(4), pp. 1083-1113. ISSN 0969-9988
Chen, Q; Jin, R and Soboyejo, A (2013) Understanding a contractor's regional variations in safety performance. Journal of Construction Engineering and Management, 139(6), pp. 641-653. ISSN 0733-9364
Chen, Q; Jin, Z; Xia, B; Wu, P and Skitmore, M (2016) Time and cost performance of design-build projects. Journal of Construction Engineering and Management, 142(2): 04015074, ISSN 0733-9364
Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.
Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains. PhD thesis, Stanford University, USA.
Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.
Chen, W (2019) Integration of building information modeling and internet of things for facility maintenance management. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Chen, W T and Huang, Y H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Construction Management and Economics, 24(12), pp. 1231-1239. ISSN 1466433X
Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.
Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technologies in the AEC sector: A comparative study of digital competence among industry practitioners. International Journal of Construction Management, 25(1), pp. 63-76. ISSN 1562-3599
Chen, Z; Boateng, P and Ogunlana, S O (2019) A dynamic system approach to risk analysis for megaproject delivery. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 232-252. ISSN 17514304
Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.
Cheng, J C P; Chen, K; Wong, P K Y; Chen, W and Li, C T (2021) Graph-based network generation and CCTV processing techniques for fire evacuation. Building Research & Information, 49(2), pp. 179-196. ISSN 0961-3218
Cheng, M Y; Chang, Y H and Korir, D (2019) Novel approach to estimating schedule to completion in construction projects using sequence and nonsequence learning. Journal of Construction Engineering and Management, 145(11): 04019072, ISSN 0733-9364
Cheng, M Y; Huang, K Y and Hutomo, M (2018) Multiobjective dynamic-guiding PSO for optimizing work shift schedules. Journal of Construction Engineering and Management, 144(9): 04018089, ISSN 0733-9364
Cheng, Y M; Yu, C H and Wang, H T (2011) Short-interval dynamic forecasting for actual S-curve in the construction phase. Journal of Construction Engineering and Management, 137(11), pp. 933-941. ISSN 0733-9364
Cheraghi, E; Zohrehvandi, S; Vanhoucke, M and Mohamadpour Tosarkani, B (2023) A multiproject scheduling and resource management model in projects construction. Engineering, Construction and Architectural Management, 30(4), pp. 1578-1600. ISSN 0969-9988
Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364
Cheung, C M; Bowen, P; Cattell, K and Davis, J (2019) Measuring what counts: Workplace well-being of project professionals. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Cheung, F K T; Kurul, E and Oti, A H (2016) A case study of hybrid strategies to create value for a contracting business in the education sector in England and Wales. Construction Management and Economics, 34(4-5), pp. 335-352. ISSN 01446193
Cheung, S O; Lyeung, D K; Cheung, F K T and Suen, H C H (2002) A planning framework for conditions of contract for use in partnering projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chevallier, N J and Russell, A D (2001) Developing a draft schedule using templates and rules. Journal of Construction Engineering and Management, 127(5), pp. 391-398. ISSN 0733-9364
Chia, F C; Skitmore, M; Gray, J and Bridge, A (2018) International comparisons of nominal and real construction labour productivity. Engineering, Construction and Architectural Management, 25(7), pp. 896-915. ISSN 0969-9988
Chien, H-J (2003) Developing a digital nervous system for enhancing effectiveness of construction management and increasing commercial benefit in the UK construction industry. PhD thesis, University of Glamorgan, UK.
Chileshe, N and Dzisi, E (2012) Benefits and barriers of construction health and safety management (HSM): Perceptions of practitioners within design organisations. Journal of Engineering, Design and Technology, 10(2), pp. 276-298. ISSN 1726-0531
Chileshe, N; Reza Hosseini, M and Jepson, J (2016) Critical barriers to implementing risk assessment and management practices in the Iranian construction sector. Journal of Construction in Developing Countries, 21(2), pp. 81-112. ISSN 1823-6499
Chin, C S and Russell, J S (2008) Predicting the expected service level and the realistic lead time of rfi process using binary logistic regression. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.
Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.
Chinazzo, G. and Wang, N. (2026) How buildings shape occupant movement: A systematic review and framework. Buildings & Cities, 7(1), pp. 504-522. ISSN 2632-6655
Ching, W C; Mohd-Rahim, F A and Chuing, L S (2021) Enterprise risk management and risk culture in construction public listed companies. Journal of Construction in Developing Countries, 26(2), pp. 17-36. ISSN 1823-6499
Chinyio, E and Morton, N (2006) The effectiveness of e-learning. Architectural Engineering and Design Management, 2(1-2), pp. 73-86. ISSN 1745-2007
Chiponde, D B; Gledson, B and Greenwood, D (2020) An integrated approach to learning from project-related failures. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Chiu, L F; Lowe, R; Raslan, R; Altamirano-Medina, H and Wingfield, J (2014) A socio-technical approach to post-occupancy evaluation: Interactive adaptability in domestic retrofit. Building Research & Information, 42(5), pp. 574-590. ISSN 0961-3218
Chiu, W Y B and Lai, J H K (2020) Building information modelling for building services engineering: Benefits, barriers and conducive measures. Engineering, Construction and Architectural Management, 27(9), pp. 2221-2252. ISSN 0969-9988
Chiu, W Y B and Ng, F F (2015) Enhancement of organizational commitment through propensity to trust. Engineering, Construction and Architectural Management, 22(3), pp. 272-294. ISSN 0969-9988
Chiu H.N, T D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(1), pp. 55-66. ISSN 01446193
Cho, K and Hastak, M (2013) Time and cost-optimized decision support model for fast-track projects. Journal of Construction Engineering and Management, 139(1), pp. 90-101. ISSN 0733-9364
Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.
Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.
Cho, Y K; Haas, C T; Sreenivasan, S V and Liapi, K (2004) Position error modeling for automated construction manipulators. Journal of Construction Engineering and Management, 130(1), pp. 50-58. ISSN 0733-9364
Cho, Y-K (2000) Human-assisted rapid workspace modeling for construction equipment operations. PhD thesis, University of Texas at Austin, USA.
Choe, Sooyoung (2015) 4-dimensional process-aware site-specific construction safety planning. PhD thesis, University of Texas at Austin, USA.
Choi, B; Lee, H S; Park, M; Cho, Y K and Kim, H (2014) Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management, 140(9): 04014041, ISSN 0733-9364
Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.
Choi, J and Song, H (2014) Evaluation of the modular method for industrial plant construction projects. International Journal of Construction Management, 14(3), pp. 171-180. ISSN 1562-3599
Choi, J O; O'Connor, J T and Kim, T W (2016) Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis. Journal of Construction Engineering and Management, 142(10): 04016055, ISSN 0733-9364
Choi, K (2008) A new decision-support model for innovative contracting strategies through a quantitative analysis on aspects of project performance. PhD thesis, University of California, Berkeley, USA.
Choi, K; Kwak, Y H; Pyeon, J H and Son, K (2012) Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects. Journal of Construction Engineering and Management, 138(3), pp. 323-330. ISSN 0733-9364
Choi, K; Lee, E B; Ibbs, C W and Kim, Y W (2009) Multifaceted public outreach and cost-benefit analysis for its effectiveness validation. Construction Management and Economics, 27(8), pp. 771-782. ISSN 1466433X
Choi, K; Lee, H W; Bae, J and Bilbo, D (2016) Time-cost performance effect of change orders from accelerated contract provisions. Journal of Construction Engineering and Management, 142(3): 04015085, ISSN 0733-9364
Choi, K C (1992) An object-oriented historical cost information base to support concurrent engineering. PhD thesis, University of California, Berkeley, USA.
Choi, S D (2008) Postural balance and adaptations in transitioning sloped surfaces. International Journal of Construction Education and Research, 4(3), pp. 189-199. ISSN 1557-8771
Choi, Seogjae (2024) Addressing material-related issues in industrial construction projects: The state of supplier involvement in project planning and the barriers to information sharing. PhD thesis, University of Texas at Austin, USA.
Chong, W K O (2005) Construction production rate information system for highway projects. PhD thesis, University of Texas at Austin, USA.
Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.
Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364
Choudhry, R M; Aslam, M A and Arain, F M (2014) Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7): 04014020, ISSN 0733-9364
Choudhury, I (2009) The effect of political unrest on construction time for food grain warehouses in Bangladesh. Construction Management and Economics, 27(7), pp. 619-624. ISSN 1466433X
Chow, D H C (2005) Effects of future climate change and near-extreme weather on office building in the UK. PhD thesis, University of Manchester, UK.
Christodoulou, S (2005) Construction scheduling with artificial agents and the ant colony optimization metaheuristic. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Christodoulou, S E; Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5), pp. 518-527. ISSN 0733-9364
Christodoulou, S E; Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(3), pp. 229-240. ISSN 1466433X
Chritamara, S; Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(4), pp. 269-295. ISSN 1471-4175
Chrzanowski, E N and Johnston, D W (1986) Application of linear scheduling. Journal of Construction Engineering and Management, 112(4), pp. 476-491. ISSN 0733-9364
Chua, D K H and Goh, Y M (2004) Incident causation model for improving feedback of safety knowledge. Journal of Construction Engineering and Management, 130(4), pp. 542-551. ISSN 0733-9364
Chua, D K H; Kog, Y C and Loh, P K (1999) Critical success factors for different project objectives. Journal of Construction Engineering and Management, 125(3), pp. 142-150. ISSN 0733-9364
Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364
Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364
Chua, D K H; Tyagi, A; Ling, S and Bok, S H (2003) Process-parameter-interface model for design management. Journal of Construction Engineering and Management, 129(6), pp. 653-663. ISSN 0733-9364
Chua, D K H and Yeoh, K W (2011) PDM++: Planning framework from a construction requirements perspective. Journal of Construction Engineering and Management, 137(4), pp. 266-274. ISSN 0733-9364
Chung, J K H; Shen, G Q P; Leung, B Y P; Hao, J J L; Hills, M J; Fox, P W and Zou, P X W (2005) Using e-learning to deliver construction technology for undergraduate students. A case study in Hong Kong. Architectural Engineering and Design Management, 1(4), pp. 295-308. ISSN 1745-2007
Cirelli Jr., L R (2017) Impact of design fees and duration of design process on construction quality: Implications for quality management. PhD thesis, Baker College (Michigan), USA.
Ciribizni, A and Galimberti, G (2005) H&S planning and 4D project scheduling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Clarke, B G (2011) Educating engineers in the workplace. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(2), pp. 89-98. ISSN 17514312
Clawson, Bobie Sue Anna (2024) The influence of walking surface types on gait parameters, kinematics and worker perceptions in relation to slips, trips, and fall incidents in the construction industry. PhD thesis, Indiana University of Pennsylvania, USA.
Clegg, D R (1999) A construction-specific simulation-based framework for earthworks. PhD thesis, Sheffield Hallam University, UK.
Clement, D; Aliabadi, A A; MacKey, J; Thé, J and Gharabaghi, B (2021) Dust emissions management model for construction sites. Journal of Construction Engineering and Management, 147(8): 04021092, ISSN 0733-9364
Cleveland Jr, A B (2011) Emerging tools to enable construction engineering. Journal of Construction Engineering and Management, 137(10), pp. 836-842. ISSN 0733-9364
Coaffee, J; Clarke, J and Davis, P T (2016) A harmonise'd approach to building security-driven urban resilience: A call to arms. Journal of Financial Management of Property and Construction, 21(1), pp. 73-80. ISSN 1366-4387
Coble, R J and Haupt, T C (2000) Effecting safety in affordable housing projects using automation. Journal of Construction Research, 1(1), pp. 1-8. ISSN 1609-9451
Cohenca-Zall, D; Laufer, A; Shapira, A and Howell, G A (1994) Process of planning during construction. Journal of Construction Engineering and Management, 120(3), pp. 561-578. ISSN 0733-9364
Cole, B K (2012) Building social infrastructure through public-private partnerships: The case of student housing in public higher education. PhD thesis, Clemson University, USA.
Cole, L J R (1991) Construction scheduling: Principles, practices, and six case studies. Journal of Construction Engineering and Management, 117(4), pp. 579-588. ISSN 0733-9364
Colin, J and Vanhoucke, M (2016) Empirical perspective on activity durations for project-management simulation studies. Journal of Construction Engineering and Management, 142(1): 04015047, ISSN 0733-9364
Collins, Wesley A (2015) Development of the project definition rating index (PDRI) for small industrial projects. PhD thesis, Arizona State University, USA.
Comassetto Hamerski, D; Saurin, T A; Formoso, C T and Isatto, E L (2024) The Last Planner system as an emergent production planning and control method: The role of multiple representations. Journal of Construction Engineering and Management, 150(11): 04024155, ISSN 0733-9364
Comelli, T; Pelling, M; Hope, M; Ensor, J; Filippi, M E; Menteşe, E Y and McCloskey, J (2024) Normative future visioning: A critical pedagogy for transformative adaptation. Buildings & Cities, 5(1), pp. 83-100. ISSN 2632-6655
Commuri, S; Mai, A T and Zaman, M (2011) Neural network-based intelligent compaction analyzer for estimating compaction quality of hot asphalt mixes. Journal of Construction Engineering and Management, 137(9), pp. 634-644. ISSN 0733-9364
Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.
Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants. EngD thesis, Brunel University, UK.
Cooke-Davies, T J (2000) Towards improved project management practice: uncovering the evidence for effective practices through empirical research. PhD thesis, Leeds Beckett University, UK.
Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance. PhD thesis, University of Alberta, Canada.
Cosma, C (2003) Development of a systematic approach for uncertainty assessment in scheduling multiple repetitive construction processes by using fuzzy set theory. PhD thesis, University of Florida, USA.
Cothern, E J (2021) Exposure to respirable crystalline silica during five OSHA Table 1 tasks and the effectiveness of dust controls, the contribution of background silica dust to personal exposures, and the use of a photometric instrument to assess silica dust exposure in real time. PhD thesis, Colorado State University, USA.
Cottrell, W D (1999) Simplified program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 125(1), pp. 16-22. ISSN 0733-9364
Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(4), pp. 355-364. ISSN 01446193
Coutts, A W (1997) Change management in the construction industry: a client's mechanism for control. PhD thesis, Heriot-Watt University, UK.
Cowie, G F (1987) Enough scope yields better estimates. Journal of Construction Engineering and Management, 113(2), pp. 315-320. ISSN 0733-9364
Coşkunoḡlu, O (1984) Optimal probabilistic compression of PERT networks. Journal of Construction Engineering and Management, 110(4), pp. 437-446. ISSN 0733-9364
Crabtree, P J (2014) The optimisation of construction management higher education to promote professional competencies and professional capability. PhD thesis, Anglia Ruskin University, UK.
Craig, D (2002) A model for customer-focused culture change in the speculative house-building industry: Executive summary. EngD thesis, University of Warwick, UK.
Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(1), pp. 91-100. ISSN 01446193
Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.
Crascall, L M (2021) Re-imagining built environment education: investigating the pracademic through autoethnography. DProf thesis, Anglia Ruskin University, UK.
Crawford, L (2001) Project management competence: the value of standards. PhD thesis, Henley Business School, UK.
Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.
Creedy, G D; Skitmore, M and Wong, J K W (2010) Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), pp. 528-537. ISSN 0733-9364
Crook, D (1997) Empirical enquiry or metaphysics? Re-specifying the methodological debate. Journal of Construction Procurement, 3(2), pp. 56-71. ISSN 1358-9180
Crowley, L G (2000) Friedman and gates: another look. Journal of Construction Engineering and Management, 126(4), pp. 306-312. ISSN 0733-9364
Cruz, C O and Marques, R C (2013) Exogenous determinants for renegotiating public infrastructure concessions: Evidence from Portugal. Journal of Construction Engineering and Management, 139(9), pp. 1082-1090. ISSN 0733-9364
Cruz, C O; Marques, R C and Pereira, I (2015) Alternative contractual arrangements for urban light rail systems: Lessons from two case studies. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Cruz Ortiz, M R P (2019) Expanding modular design: All-rise mass timber residences in Hawaii. DArch thesis, University of Hawai'i at Manoa, USA.
Cunha, L R M; Bastos, C D; Meijon, M N H and Araújo, D F (2016) Gamification technique for supporting transparency on construction sites: A case study. Engineering, Construction and Architectural Management, 23(6), pp. 801-822. ISSN 0969-9988
Curtis, B (1994) Roles, responsibilities and risks in management contracts. PhD thesis, University of Southampton, UK.
Cusack, M M (1985) The use of integer linear programming for modelling project control information. Construction Management and Economics, 3(2), pp. 91-104. ISSN 01446193
Cusack, M M (1985) A simplified approach to the planning and control of cost and project duration. Construction Management and Economics, 3(3), pp. 183-198. ISSN 01446193
Cusumano, L; Farmakis, O; Granath, M; Olsson, N; Jockwer, R and Rempling, R (2025) Current benefits and future possibilities with digital field reporting. International Journal of Construction Management, 25(5), pp. 572-583. ISSN 1562-3599
Cutrim, Sérgio Sampaio (2017) Port planning and governance in Brazil. PhD thesis, Universidade de São Paulo, Brazil.
Czarnocki, V and Murray, M (2004) The new scottish parliament project: A content analysis of two broadsheet newspapers. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Cândido, L F; Lima, S H D O and Machado Oliveira, F M (2026) Determinants of delay in small construction projects: Evidence from Brazil. International Journal of Construction Management, 26(1), pp. 168-184. ISSN 1562-3599
D'Onofrio, R M (2017) CPM scheduling: A 60-year history. Journal of Construction Engineering and Management, 143(10): 02517010, ISSN 0733-9364
D'Orazio, M; Bernardini, G and Di Giuseppe, E (2024) Improving sustainable management of university buildings based on occupancy data. Journal of Construction Engineering and Management, 150(1): 04023154, ISSN 0733-9364
Da Rocha, C G and Kemmer, S L (2013) Method to implement delayed product differentiation in construction of high-rise apartment building projects. Journal of Construction Engineering and Management, 139(10): 05013001, ISSN 0733-9364
Da Rocha, C G; Wijayaratna, K; Jong, K and Haller, D (2023) Examining off-site construction from a flow viewpoint. Journal of Construction Engineering and Management, 149(3): 05023001, ISSN 0733-9364
Da Silva, N A F (2015) Building certification schemes and the quality of indoor environment. PhD thesis, National University of Singapore, Singapore.
Dabbas, M A A (1981) Computerized decision making in construction. PhD thesis, Georgia Institute of Technology, USA.
Dabirian, S; Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(3), pp. 1201-1221. ISSN 0969-9988
Dabke, S; Salem, O; Genaidy, A and Daraiseh, N (2008) Job satisfaction of women in construction trades. Journal of Construction Engineering and Management, 134(3), pp. 205-216. ISSN 0733-9364
Dada, J O and Jagboro, G O (2007) An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(1), pp. 37-44. ISSN 1366-4387
Dai, F; Rashidi, A; Brilakis, I and Vela, P (2013) Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure. Journal of Construction Engineering and Management, 139(1), pp. 69-79. ISSN 0733-9364
Dainty, A R J; Cheng, M I and Moore, D R (2003) Redefining performance measures for construction project managers: An empirical evaluation. Construction Management and Economics, 21(2), pp. 209-218. ISSN 01446193
Dainty, A R J and Edwards, D J (2003) The UK building education recruitment crisis: A call for action. Construction Management and Economics, 21(7), pp. 767-775. ISSN 01446193
Dainty, A R J; Harty, T E and Neale, R H (2000) Improving employee resourcing within large construction organizations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Dallasega, P; Schulze, F and Revolti, A (2023) Augmented reality to overcome visual management implementation barriers in construction: A mep case study. Construction Management and Economics, 41(3), pp. 232-255. ISSN 01446193
Damci, A (2022) Revisiting the concept of natural rhythm of production in line of balance scheduling. International Journal of Construction Management, 22(12), pp. 2335-2344. ISSN 1562-3599
Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364
Damnjanovic, I and Zhou, X (2009) Impact of crude oil market behaviour on unit bid prices: The evidence from the highway construction sector. Construction Management and Economics, 27(9), pp. 881-890. ISSN 1466433X
Damrianant, Jirawat (1999) Petri net-based systems for construction-process modelling and simulation. PhD thesis, University of New South Wales, Australia.
Dan, Y and Liu, G (2024) Integrated scheduling optimization of production and transportation for precast component with delivery time window. Engineering, Construction and Architectural Management, 31(8), pp. 3335-3355. ISSN 0969-9988
Dandago, A A; Yamusa, M A; Lawal, H S; Abubakar, M; Abdullahi, M and Zailani, B M (2025) Impact of uncertainty factors on the performance of building renovation projects. Journal of Engineering, Design and Technology, 23(6), pp. 1875-1897. ISSN 1726-0531
Danel, T; Lafhaj, Z; Puppala, A; BuHamdan, S; Lienard, S and Richard, P (2024) Identifying tower crane activities with data: The case of the concrete pouring. Engineering, Construction and Architectural Management, 31(2), pp. 939-956. ISSN 0969-9988
Dang, T and Bargstädt, H J (2016) 4D relationships: The missing link in 4D scheduling. Journal of Construction Engineering and Management, 142(2): 04015072, ISSN 0733-9364
Dang-Trinh, N; Duc-Thang, P; Nguyen-Ngoc Cuong, T and Duc-Hoc, T (2023) Machine learning models for estimating preliminary factory construction cost: Case study in southern Vietnam. International Journal of Construction Management, 23(16), pp. 2879-2887. ISSN 1562-3599
Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement. PhD thesis, Nottingham Trent University, UK.
Daniel, E I and Oshodi, O (2023) Lean-offsite-simulation nexus for housing construction: A state-of-the-art review of the existing knowledge. Construction Innovation, 23(5), pp. 994-1017. ISSN 1471-4175
Daniel, E I; Oshodi, O S and Marte Gomez, J (2025) Developing future skills for the engineering sector: evidence from the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 65-75. ISSN 17514304
Daniel, E I; Oshodi, O S and Odediran, S (2024) An exploration of construction craftspeople apprentice training: Evidence from the UK. International Journal of Construction Education and Research, 20(2), pp. 218-240. ISSN 15578771
Daniel, E I; Pasquire, C and Dickens, G (2014) Social perspective of planning in construction: The UK experience. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Daniel, E I; Pasquire, C; Dickens, G and Ballard, H G (2017) The relationship between the last planner® system and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(3), pp. 407-425. ISSN 0969-9988
Danso-Amoako, M O (2006) Developing a framework to support data exchange from heterogeneous data sources via industry foundation classes (IFC) and web services. PhD thesis, University of Florida, USA.
Dardouri, S; BuHamdan, S; Al Balkhy, W; Dakhli, Z; Danel, T and Lafhaj, Z (2023) RFID platform for construction materials management. International Journal of Construction Management, 23(14), pp. 2509-2519. ISSN 1562-3599
Darko, A; Glushakova, I; Boateng, E B and Chan, A P C (2023) Using machine learning to improve cost and duration prediction accuracy in green building projects. Journal of Construction Engineering and Management, 149(8): 04023061, ISSN 0733-9364
Darlow, M J (1968) Investigations into line of balance scheduling house building. PhD thesis, Loughborough University, UK.
Darragh, A J R (2001) Patterns of injury among residential construction workers before and after a safety intervention program, 1994-1998. PhD thesis, Colorado State University, USA.
Das, D K and Emuze, F (2017) A dynamic model of contractor-induced delays in India. Journal of Construction in Developing Countries, 22(1), pp. 21-39. ISSN 1823-6499
Das, D K (2025) Mitigating construction delays in Indian real estate projects through effective organizational and project management. International Journal of Building Pathology and Adaptation, 43(6), pp. 1423-1438. ISSN 2398-4708
Das, P K (2006) A sustainability impact-assessment tool for selected building technologies in rural India: the case of the Andhra Pradesh primary education project. PhD thesis, University of Newcastle upon Tyne, UK.
Davenport, P (1993) Extensions of time: time for change. Construction Management and Economics, 11(4), pp. 305-307. ISSN 01446193
Davey, C L; Lowe, D J and Duff, A R (2001) Generating opportunities for SMEs to develop partnerships and improve performance. Building Research & Information, 29(1), pp. 1-11. ISSN 0961-3218
Davey, C L; Powell, J A; Cooper, I and Powell, J E (2004) Innovation, construction SMEs and action learning. Engineering, Construction and Architectural Management, 11(4), pp. 230-237. ISSN 0969-9988
David, D D (2007) Numerical platform to validate resistivity testing for NDE of civil engineering structures. PhD thesis, Wayne State University, USA.
Davidson, R (2021) Innovation within private finance initiative projects: the influence of governance throughout the first stage of post-contract implementation. PhD thesis, University of Brighton, UK.
Davis, C and Cochrane, S R (1987) Optimization of future manpower requirements in a multi-discipline consultancy. Construction Management and Economics, 5(1), pp. 45-56. ISSN 01446193
Davis, M C (2011) Psychological and organisational issues in the design of buildings and workplaces. PhD thesis, University of Leeds, UK.
Dawood, I (2010) Decision support system (DSS) model to facilitate strategic planning of the housing industry in the developing world. PhD thesis, University of Salford, UK.
Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193
Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(2), pp. 210-230. ISSN 0969-9988
Dawood, N and Sikka, S (2007) Measuring the effectiveness of 4D planning as a valuable communication tool. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988
Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193
Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193
Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: An application to the pre-cast industry. Construction Management and Economics, 13(1), pp. 53-64. ISSN 01446193
Dawood, N N (1996) A strategy for a computer-based materials management system for the building industry. Journal of Financial Management of Property and Construction, 1(2), pp. 17-28. ISSN 1366-4387
Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Dawson, S and Osborne, A (2020) Re-shaping built environment higher education: The impact of degree apprenticeships in England. International Journal of Construction Education and Research, 16(2), pp. 102-116. ISSN 1557-8771
Day, K D (1989) The administration of the 'botched' FIDIC contract: the problems arising out of the administration of a wrongly 'slanted' contract for turnkey projects. PhD thesis, University of Southampton, UK.
Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.
De Athayde Prata, B; Pitombeira-Neto, A R and De Moraes Sales, C J (2015) An integer linear programming model for the multiperiod production planning of precast concrete beams. Journal of Construction Engineering and Management, 141(10): 04015029, ISSN 0733-9364
De Filippi, Giancarlo Azevedo (2017) Method for production planning and management of time in real estate projects. PhD thesis, Universidade de São Paulo, Brazil.
De La Garza, J M and Pishdad-Bozorgi, P (2018) Workflow process model for flash track projects. Journal of Construction Engineering and Management, 144(6): 06018001, ISSN 0733-9364
De La Garza, J M; Prateapusanond, A and Ambani, N (2007) Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11), pp. 836-845. ISSN 0733-9364
De La Garza-Rodriguez, J M (1988) A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
De Marco, A; Briccarello, D and Rafele, C (2009) Cost and schedule monitoring of industrial building projects: Case study. Journal of Construction Engineering and Management, 135(9), pp. 853-862. ISSN 0733-9364
De Marco, A and Mangano, G (2013) Risk and value in privately financed health care projects. Journal of Construction Engineering and Management, 139(8), pp. 918-926. ISSN 0733-9364
De Marco, A; Mangano, G; Cagliano, A C and Grimaldi, S (2012) Public financing into build-operate-transfer hospital projects in Italy. Journal of Construction Engineering and Management, 138(11), pp. 1294-1302. ISSN 0733-9364
De Ridder, H A J (1994) Design and construct of complex civil engineering systems: A new approach to organization and contracts. PhD thesis, Delft University of Technology, Netherlands.
Debela, G Y (2022) Critical success factors (CSFs) of public-private partnership (PPP) road projects in Ethiopia. International Journal of Construction Management, 22(3), pp. 489-500. ISSN 1562-3599
Deep, A; Nayyer, M I and Annamalai, T R (2025) When sauce for the goose is not sauce for the gander—the divergent impact of transparency law in infrastructure procurement: Evidence from EPC and PPP road projects in India. Construction Management and Economics, 43(11), pp. 922-937. ISSN 0144-6193
Dehghan, R (2012) A new model, algorithm and computer tool to optimize overlapping of design activities in construction projects. PhD thesis, University of Calgary, Canada.
Dehghan, R and Ruwnapura, J Y (2014) Model of trade-off between overlapping and rework of design activities. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364
Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.
Delatte, N J (2017) Challenges of civil engineering megaprojects in North America. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 161-166. ISSN 17514304
Delgado-Arvelo, Y (2012) An investigation into the data collection process for the development of cost models. PhD thesis, De Montfort University, UK.
Delgado-Hernández, D J and Palacios-Navarro, U J (2024) A Bayesian network for selecting improvement management tools to increase customer satisfaction in the construction industry: Case study of Mexico. Engineering, Construction and Architectural Management, 31(7), pp. 2900-2915. ISSN 0969-9988
Deloly, C; Gall, A R; Moore, G; Bretelle, L; Milner, J; Mohajeri, N; Osrin, D; Salvia, G; Symonds, P; Tsoulou, I; Zimmermann, N; Wilkinson, P and Davies, M (2021) Relationship-building around a policy decision-support tool for urban health. Buildings & Cities, 2(1), pp. 717-733. ISSN 2632-6655
Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.
Demirel, H Ç; Volker, L; Leendertse, W and Hertogh, M (2019) Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects. Journal of Construction Engineering and Management, 145(11): 04019073, ISSN 0733-9364
Demirkesen, S (2024) Prediction of number of insured having work accident in Turkish construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 193-206. ISSN 17514304
Deng, F (2015) Performance measurement system: attributes, effects and context in UK construction firms. PhD thesis, University College London, UK.
Deng, H; Hong, H; Luo, D; Deng, Y and Su, C (2020) Automatic indoor construction process monitoring for tiles based on BIM and computer vision. Journal of Construction Engineering and Management, 146(1): 04019095, ISSN 0733-9364
Deng, Y and Poon, S W (2014) Mega-event flagships in transformation: Learning from Expo 2010 Shanghai China. Journal of Engineering, Design and Technology, 12(4), pp. 440-460.
Deng, Zhong Ming (1995) Extended state space modelling and influence diagrams for construction processes and aids. PhD thesis, University of New South Wales, Australia.
Denicol, Juliano (2019) Designing client organisations and supply chain strategies to deliver megaprojects. PhD thesis, University College London, UK.
Dent, S and Smallwood, J J (2014) Building economics pre-course student perceptions. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Derakhshanfar, H; Ochoa, J J; Kirytopoulos, K; Mayer, W and Langston, C (2021) A cartography of delay risks in the Australian construction industry: Impact, correlations and timing. Engineering, Construction and Architectural Management, 28(7), pp. 1952-1978. ISSN 0969-9988
Derakhshanfar, Hossein (2021) A delay risk management framework for construction projects: Learning from past experiences. PhD thesis, University of South Australia, Australia.
Desgagné-Lebeuf, A; Lehoux, N and Beauregard, R (2022) Scheduling tools for the construction industry: Overview and decision support system for tool selection. International Journal of Construction Management, 22(14), pp. 2687-2698. ISSN 1562-3599
Deshpande, A S (2009) Best practices for the management of design in fast track industrial projects. PhD thesis, University of Cincinnati, USA.
Deshpande, A S; Salem, O M and Miller, R A (2012) Analysis of the higher-order partial correlation between CII best practices and performance of the design phase in fast-track industrial projects. Journal of Construction Engineering and Management, 138(6), pp. 716-724. ISSN 0733-9364
Devaney, S and Roberts, D (2012) Who gets the jobs? Factors influencing the employability of property and construction graduates in the UK. Construction Management and Economics, 30(3), pp. 233-246. ISSN 1466433X
Dhanasekar, M (2000) Identification of optimal size resources for a repetitive housing construction. Engineering, Construction and Architectural Management, 7(4), pp. 347-361. ISSN 0969-9988
Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.
Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.
Diab, M F (2011) Analyses of highway project construction risks, performance, and contingency. PhD thesis, North Dakota State University, USA.
Dias Barkokebas, R and Li, X (2023) VR-ret: A virtual reality-based approach for real-time ergonomics training on industrialized construction tasks. Journal of Construction Engineering and Management, 149(10): 04023098, ISSN 0733-9364
Dikmen, I; Birgonul, M T; Tah, J H M and Ozer, A H (2012) Web-based risk assessment tool using integrated duration-cost influence network model. Journal of Construction Engineering and Management, 138(9), pp. 1023-1034. ISSN 0733-9364
Dilger, W H; Tadros, G S and Giannelia, P (1992) Method proposed for construction of multispan cable-stayed bridges. Journal of Construction Engineering and Management, 118(2), pp. 273-282. ISSN 0733-9364
Dixit, V (2022) Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(8), pp. 1537-1549. ISSN 1562-3599
Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599
Djebarni, R (1993) Leadership patterns in the construction industry in Algeria. PhD thesis, University of Reading, UK.
Dlakwa, M M (1990) Analysis of some problems in the management and cost control of public sector construction projects in Nigeria. PhD thesis, University of Stirling, UK.
Do, S T; Nguyen, V T; Tran, C N N and Aung, Z M (2023) Identifying and evaluating the key claim causes leading to construction delays. International Journal of Construction Management, 23(12), pp. 1999-2011. ISSN 1562-3599
Dodanwala, T C and Santoso, D S (2025) Critical factors influencing the bid/no-bid decisions of small and medium-sized contractors in Sri Lanka. International Journal of Construction Education and Research, 21(1), pp. 24-49. ISSN 1557-8771
Dodd, M; Madabhushi, N and Lees, R (2025) Placemaking living lab: Creating resilient social and spatial infrastructures. Buildings & Cities, 6(1), pp. 1027-1045. ISSN 2632-6655
Doerstling, K W (2003) Building inspectors: Bureaucrats, professionals or heroes? PhD thesis, University of Southern California, USA.
Dolidze, G and Spillane, J P (2020) Smart city approach to educational campuses: Case study at University of Limerick, Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(3), pp. 95-103. ISSN 17514304
Dolla, T and Laishram, B (2022) Strategies to promote collaborative governance regime in Indian rural road maintenance. Built Environment Project and Asset Management, 12(3), pp. 365-381. ISSN 2044-124X
Doloi, H (2013) Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3), pp. 267-279. ISSN 0733-9364
Doloi, H; Sawhney, A and Iyer, K C (2012) Structural equation model for investigating factors affecting delay in Indian construction projects. Construction Management and Economics, 30(10), pp. 869-884. ISSN 1466433X
Domingo, N; Osmani, M and Price, A D F (2008) Reducing construction waste in healthcare facilities: A project lifecycle approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Domínguez-Hernández, J; Pérez-Bella, J M; Alonso-Martínez, M; Cano-Suñén, E and del Coz-Díaz, J J (2017) Assessment of water penetration risk in building facades throughout Brazil. Building Research & Information, 45(5), pp. 492-507. ISSN 0961-3218
Dong, S.; Xu, S. and Zhang, Y. (2026) Understanding the factors influencing work-life conflict in construction practitioners: A meta-analysis study. International Journal of Building Pathology and Adaptation, 44(3), pp. 567-582. ISSN 2398-4708
Dong, Z.; Lu, W.; Wu, L.; Jiang, C. and Fu, Y. (2026) Efficiency-enhanced machine learning on blockchain (MLOB) framework for real-time construction activities recognition. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988
Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects. PhD thesis, Stanford University, USA.
Dong, Z; Qin, R; Zou, P; Yao, X; Cui, P; Zhang, F and Yang, Y (2025) Occupational health risk assessment of PC production-caused pollution based on damage assessment and cyclic mitigation model. Engineering, Construction and Architectural Management, 32(6), pp. 3679-3699. ISSN 0969-9988
Doorsamy, W and Padayachee, K (2019) Conceptualising the knower for a new engineering technology curriculum. Journal of Engineering, Design and Technology, 17(4), pp. 808-818. ISSN 1726-0531
Dorward, D R (2006) The effect of selected output modifications on facilitating the assessment of PDM schedules. PhD thesis, Indiana State University, USA.
Dosumu, O; Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), pp. 11-23. ISSN 2521-0165
Dosumu, O S; Mahame, C; Niyitegeka, S and Hahiirwuwambaza, J A (2023) Applications and challenges of adopting the internet of things (IoT) in the Rwandan construction industry. Journal of Construction in Developing Countries, 28(2), pp. 81-100. ISSN 1823-6499
Dou, Y; Zhong, L and Luo, L (2025) Supply chain resilience of prefabricated construction: Perspectives of stakeholder capabilities and vulnerabilities. Journal of Construction Engineering and Management, 151(4): 04025013, ISSN 0733-9364
Doukari, O; Kassem, M; Scoditti, E; Aguejdad, R and Greenwood, D (2024) A BIM based tool for evaluating building renovation strategies: The case of three demonstration sites in different European countries. Construction Innovation, 24(1), pp. 365-383. ISSN 1471-4175
Doulabi, S H H; Seifi, A and Shariat, S Y (2011) Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. ISSN 0733-9364
Dowdle, D L (2006) Engaging learners: The development of effective e-learning applications for students of the built environment. Architectural Engineering and Design Management, 2(1-2), pp. 31-48. ISSN 1745-2007
Dowsett, R; Green, M; Sexton, M and Harty, C (2019) Projecting at the project level: MMC supply chain integration roadmap for small housebuilders. Construction Innovation, 19(2), pp. 193-211. ISSN 1471-4175
Driessen, M (2014) Asphalt encounters: Chinese road building in Ethiopia. PhD thesis, University of Oxford, UK.
Drèze, J (1983) On the choice of shadow prices for project evaluation. PhD thesis, Indian Statistical Institute - Kolkata, India.
Du, H (2012) Modelling of building performance under the UK climate change projections and the prediction of future heating and cooling design loads in building spaces. PhD thesis, University of Northumbria at Newcastle, UK.
Du, J (2012) Investigation of interpersonal cooperation in construction project teams: An agent-based modeling approach. PhD thesis, Michigan State University, USA.
Du, J; El-Gafy, M and Zhao, D (2016) Optimization of change order management process with object-oriented discrete event simulation: Case study. Journal of Construction Engineering and Management, 142(4): 05015018, ISSN 0733-9364
Du, J; Xue, Y; Sugumaran, V; Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(4), pp. 1601-1635. ISSN 0969-9988
Du Plessis, C and Sherratt, F (2020) Construction 4.0 and built assets in-use: Creating an e-topia or dystopia? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 182-189. ISSN 17514304
Du Toit, G J (1997) The potential of labour-intensive construction methods in the provision of urban infrastructure. PhD thesis, University of Pretoria, South Africa.
DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.
Duan, P; Zhou, J and Tao, S (2023) Risk events recognition using smartphone and machine learning in construction workers' material handling tasks. Engineering, Construction and Architectural Management, 30(8), pp. 3562-3582. ISSN 0969-9988
Duanshun, Li (2018) Towards fully integrated and automated construction planning on earthworks projects. PhD thesis, University of Alberta, Canada.
Duarte, J P and Correia, R (2006) Implementing a description grammar: Generating housing programs online. Construction Innovation, 6(4), pp. 203-216. ISSN 1471-4175
Duff, A R (1980) A stochastic analysis of activity duration. Construction Papers, 1(1), pp. 63-69. ISSN 0144-8587
Duff, A R (1987) Interference in stochastic flow-line models. Journal of Construction Engineering and Management, 113(3), pp. 385-398. ISSN 0733-9364
Duff, A R; Emsley, M; Gregory, M; Lowe, D and Masterman, J (1998) Development of a model of total building procurement costs for construction clients. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.
Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364
Dulaimi, M F (2005) The influence of academic education and formal training on the project manager's behavior. Journal of Construction Research, 6(1), pp. 179-193. ISSN 1609-9451
Duncan, J (2005) Performance-based building: Lessons from implementation in New Zealand. Building Research & Information, 33(2), pp. 120-127. ISSN 0961-3218
Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.
Dunn, P J; Oyegoke, A S; Ajayi, S; Palliyaguru, R and Devkar, G (2023) Challenges and benefits of led retrofit projects: A case of salix financed secondary school in the UK. Journal of Engineering, Design and Technology, 21(6), pp. 1883-1900. ISSN 1726-0531
Dunston, P S and Reed, A G (2000) Benefits of small projects team initiative. Journal of Construction Engineering and Management, 126(1), pp. 22-28. ISSN 0733-9364
Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects. PhD thesis, Nottingham Trent University, UK.
Durdyev, S (2021) Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(4), pp. 1241-1260. ISSN 0969-9988
Durnall, T J and Proverbs, D (2009) An alternative model of motivation for steeplejacks within the petrochemical and power generation industries. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Dursun, O and Stoy, C (2011) Time-cost relationship of building projects: Statistical adequacy of categorization with respect to project location. Construction Management and Economics, 29(1), pp. 97-106. ISSN 1466433X
Dursun, O and Stoy, C (2012) Determinants of construction duration for building projects in Germany. Engineering, Construction and Architectural Management, 19(4), pp. 444-468. ISSN 0969-9988
Duryan, M and Smyth, H (2019) Service design and knowledge management in the construction supply chain for an infrastructure programme. Built Environment Project and Asset Management, 9(1), pp. 118-137. ISSN 2044-124X
Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.
Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: I. Conceptual framework and qualitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016049, ISSN 0733-9364
Dwairi, S (2018) Development of an Ontology-based framework and tool for Employer Information Requirements (OntEIR). PhD thesis, University of the West of England, Bristol, UK.
Dzeng, R J and Tommelein, I D (1997) Boiler erection scheduling using product models and case-based reasoning. Journal of Construction Engineering and Management, 123(3), pp. 338-347. ISSN 0733-9364
Dzeng, R J; Tserng, H P and Wang, W C (2005) Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. ISSN 0733-9364
Dzeng, R J; Wang, W C and Tserng, H P (2004) Module-based construction schedule administration for public infrastructure agencies. Journal of Construction Engineering and Management, 130(1), pp. 5-14. ISSN 0733-9364
Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.
Dzokoto, F K (2016) Information behaviour of construction project actors. PhD thesis, Loughborough University, UK.
Eadie, R; Perera, S; Heaney, G and Carlisle, J (2007) Construction contractor's perspective on web-based advertising of public sector construction contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364
Easa, S M and Hossain, K M A (2008) New mathematical optimization model for construction site layout. Journal of Construction Engineering and Management, 134(8), pp. 653-662. ISSN 0733-9364
East, E W and Kim, S (1993) Standardizing scheduling data exchange. Journal of Construction Engineering and Management, 119(2), pp. 215-225. ISSN 0733-9364
East, E W and Liu, L Y (2006) Multiproject planning and resource controls for facility management. Journal of Construction Engineering and Management, 132(12), pp. 1294-1305. ISSN 0733-9364
Ebekozien, A.; Thwala, W. D. and Samsurijan, M. S. (2026) Appraising circular economy business model adoption in construction projects to achieving Sustainable Development Goal 11. International Journal of Building Pathology and Adaptation, 44(3), pp. 685-703. ISSN 2398-4708
Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2021) Low-cost housing policies and squatters struggles in Nigeria: The Nigerian perspective on possible solutions. International Journal of Construction Management, 21(11), pp. 1088-1098. ISSN 1562-3599
Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2022) Low-cost housing demand-supply gap: Government housing planners perspective on possible solutions. International Journal of Construction Management, 22(9), pp. 1736-1745. ISSN 1562-3599
Ebekozien, A and Aigbavboa, C (2022) Evaluation of built environment programmes accreditation in the 21st century education system in Nigeria: Stakeholders' perspective. International Journal of Building Pathology and Adaptation, 41(6), pp. 102-118. ISSN 23984708
Ebekozien, A and Aigbavboa, C O (2024) Improving quantity surveying education through continually updating curriculum digitalisation to meet industry requirements. Journal of Engineering, Design and Technology, 22(5), pp. 1523-1543. ISSN 1726-0531
Ebekozien, A; Aigbavboa, C O; Adekunle, S A; Aliu, J and Thwala, W D (2024) Training needs of built environment professionals: The role of fourth industrial revolution. Engineering, Construction and Architectural Management, 31(11), pp. 4353-4371. ISSN 0969-9988
Ebekozien, A; Aigbavboa, C O; Aliu, J and Thwala, W D (2024) Generic skills of future built environment practitioners in South Africa: Unexplored mechanism via students' perception. Journal of Engineering, Design and Technology, 22(2), pp. 561-577. ISSN 1726-0531
Ebekozien, A; Aigbavboa, C O; Samsurijan, M S; Aliu, J and Nwaole, A N C (2024) Mentorship as a tool for improving construction artisan's skills to achieve sustainable development Goal 8 via qualitative approach. Engineering, Construction and Architectural Management, 31(13), pp. 303-322. ISSN 0969-9988
Ebekozien, A; Aigbavboa, C O; Samsurijan, M S; Muhammad, A K and Akinradewo, O (2024) Developing a framework for housing financing: A case study of nigeria's sustainable low-cost housing via soft system methodology. Engineering, Construction and Architectural Management, 32(13), pp. 27-48. ISSN 0969-9988
Ebekozien, A; Aigbavboa, C O; Samsurijan, M S; Thwala, W D and Ahmed, M A H (2024) The role of apprenticeship in skills development of construction artisans to achieving Sustainable Development Goal 8: stakeholders' unexplored approach. Engineering, Construction and Architectural Management, 31(13), pp. 411-429. ISSN 0969-9988
Ebekozien, A; Aigbavboa, C O; Thwala, W D; Hafez, M A and Samsurijan, M S (2024) Sustainable development goals under threat: the impact of inflation on construction projects. Engineering, Construction and Architectural Management, 31(13), pp. 323-341. ISSN 0969-9988
Ebekozien, A; Aigbavboa, C O; Thwala, W D D; Aigbedion, M I and Ogbaini, I F (2023) An appraisal of generic skills for Nigerian built environment professionals in workplace: The unexplored approach. Journal of Engineering, Design and Technology, 21(6), pp. 1841-1856. ISSN 1726-0531
Ebrahimy, Y; AbouRizk, S M; Fernando, S and Mohamed, Y (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(5), pp. 462-480. ISSN 0969-9988
Eccles, S; O'Reilly, M and Stovin, V (1997) Numerical modelling of contract strategy evaluation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Echeverria-Valiente, E; Garcia-Alvarado, R; Celis-D’Amico, F and Saelzer-Fuica, G (2019) Integrated design experiences for energy-efficient housing in Chile. Construction Innovation, 19(2), pp. 236-255. ISSN 1471-4175
Echeverry, D (1991) Factors for generating initial construction schedules. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Echeverry, D; Ibbs, C W and Kim, S (1991) Sequencing knowledge for construction scheduling. Journal of Construction Engineering and Management, 117(1), pp. 118-130. ISSN 0733-9364
Edike, U E (2023) Material management practices and factors influencing material conservation on construction sites in Nigeria. Journal of Engineering, Design and Technology, 21(4), pp. 1197-1211. ISSN 1726-0531
Edirisinghe, R and Jadhav, A (2017) Is the smart safety vest a brutal innovation? Evaluation of microclimate performance using a thermal manikin. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Edward Back, W and Bell, L C (1995) Quantifying process benefits of electronic data management technologies. Journal of Construction Engineering and Management, 121(4), pp. 415-421. ISSN 0733-9364
Edwards, D; Parn, E A; Sing, M C P and Thwala, W D (2019) Risk of excavators overturning: Determining horizontal centrifugal force when slewing freely suspended loads. Engineering, Construction and Architectural Management, 26(3), pp. 479-498. ISSN 0969-9988
Edwards, D J; Cabahug, R R and Nicholas, J (2003) The impact of training and education characteristics upon plant operator maintenance proficiency. Journal of Engineering, Design and Technology, 1(2), pp. 119-134. ISSN 1726-0531
Edwards, D J and Holt, G D (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(6), pp. 417-427. ISSN 0961-3218
Edwards, D J; Owusu-Manu, D-G; Baiden, B; Badu, E and Love, P E (2017) Financial distress and highway infrastructure delays. Journal of Engineering, Design and Technology, 15(1), pp. 118-132.
Edwards, D J; Thorpe, T and Love, P (2004) Financial implications of poorly utilised construction plant and equipment. Journal of Financial Management of Property and Construction, 9(1), pp. 3-12. ISSN 1366-4387
Edwards, D J; Yang, J; Cabahug, R and Love, P E D (2005) Intelligence and maintenance proficiency: An examination of plant operators. Construction Innovation, 5(4), pp. 243-254. ISSN 1471-4175
Edwards, D J and Yisa, S (2001) Modelling the magnitude of plant downtime: A tool for improving plant operations management. Engineering, Construction and Architectural Management, 8(3), pp. 225-232. ISSN 0969-9988
Edwards, P and Bowen, P (2019) Language and communication issues in HIV/AIDS intervention management in the South African construction industry: Interview survey findings. Engineering, Construction and Architectural Management, 26(6), pp. 962-988. ISSN 0969-9988
Efebeli, T V (2021) Strategies for reducing project cost overruns in the oil and gas construction industry. PhD thesis, Walden University, USA.
Egbelakin, T; Wilkinson, S; Potangaroa, R and Ingham, J (2013) Improving regulatory frameworks for earthquake risk mitigation. Building Research & Information, 41(6), pp. 677-689. ISSN 0961-3218
Egbu, C; Hari, S and Kumar, B (2003) Knowledge management practices in small and medium enterprises in the construction industry. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Egbu, C O (1994) Management education and training for refurbishment work within the construction industry. PhD thesis, University of Salford, UK.
Egbu, C O (2004) Managing knowledge and intellectual capital for improved organizational innovations in the construction industry: An examination of critical success factors. Engineering, Construction and Architectural Management, 11(5), pp. 301-315. ISSN 0969-9988
Egbu, C O; Young, B A and Torrance, V B (1998) Planning and control processes and techniques for refurbishment management. Construction Management and Economics, 16(3), pp. 315-325. ISSN 01446193
Egbu, J U; Wood, G and Egbu, C O (2010) Critical success factors associated with effective knowledge sharing in the provision of floating support services in sheltered housing for the elderly. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Egebjerg, C (2013) Learning from movie-sets coordination. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Egger, C S (2015) Sewer rehabilitation planning under uncertainty. PhD thesis, ETH Zürich, Switzerland.
Egger, H S (1986) Business techniques and skills utilized by small residential contractors with one to four employees in six high growth areas of Texas. EdD thesis, Texas A&M University, USA.
Egwim, C N; Alaka, H; Toriola-Coker, L O; Balogun, H; Ajayi, S and Oseghale, R (2023) Extraction of underlying factors causing construction projects delay in Nigeria. Journal of Engineering, Design and Technology, 21(5), pp. 1323-1342. ISSN 1726-0531
Eid, M S; Elbeltagi, E E and El-Adaway, I H (2021) Simultaneous multi-criteria optimization for scheduling linear infrastructure projects. International Journal of Construction Management, 21(1), pp. 41-55. ISSN 1562-3599
Eikelenboom, M; van Uden, M; Coenen, T B J and Vosman, L (2025) Strategic programmes for circular construction: Lessons from three public clients. Construction Management and Economics, 43(11), pp. 901-921. ISSN 0144-6193
Eizak Shiri, F (2015) Planning intentionality and its implications for project planned time. PhD thesis, University of Manchester, UK.
Eizakshiri, F; Chan, P W and Emsley, M (2011) Delays, what delays? A critical review of the literature on delays in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ejohwomu, O A (2007) Modelling the supply and demand for construction and building services skills in the Black Country. PhD thesis, University of Wolverhampton, UK.
Ekambaram, P; Love, P E D; Kumaraswamy, M M and Ng, T S T (2014) Causal ascription of rework in building and civil engineering projects: A multivariate exploration. Engineering, Construction and Architectural Management, 21(1), pp. 111-126. ISSN 0969-9988
Ekanayake, B; Ahmadian Fard Fini, A; Wong, J K W and Smith, P (2024) A deep learning-based approach to facilitate the as-built state recognition of indoor construction works. Construction Innovation, 24(4), pp. 933-949. ISSN 1471-4175
Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Ekanayake, E M K and Perera, B A K S (2016) Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka. Built Environment Project and Asset Management, 6(5), pp. 521-534. ISSN 2044-124X
Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects. PhD thesis, Aston University, UK.
Ekemode, B G (2020) Impact of urban regeneration on commercial property values in Osogbo, Osun State, Nigeria. Smart and Sustainable Built Environment, 9(4), pp. 557-571. ISSN 2046-6099
Eksteen, B (1999) Construction management education for the 21st century: A South African perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Ekundayo, D O (2020) Quantity surveying education and the benchmarking of future needs. PhD thesis, University of Salford, UK.
El Anwar, O H E D (2009) Multi-objective optimization for temporary housing arrangements after natural disasters. PhD thesis, University of Illinois at Urbana-Champaign, USA.
El Asmar, M (2012) Modeling and benchmarking performance for the integrated project delivery (IPD) system. PhD thesis, University of Wisconsin - Madison, USA.
El Asmar, M; Hanna, A S and Loh, W Y (2013) Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11): 4013012, ISSN 0733-9364
El Kholy, S M (1991) Time and architecture: Problems of duration and sequence in architectural design. PhD thesis, University of Pennsylvania, USA.
El Sawalhi, N I H (2007) Developing a model for construction contractors pre-qualification in the Gaza Strip and West Bank. PhD thesis, University of Salford, UK.
El Tayeh, A (2008) Social web-based systems for supporting geographically dispersed project teams in the architecture-engineering-construction industry. PhD thesis, University of Manchester, UK.
El-Anwar, O and Aziz, T A (2014) Integrated urban-construction planning framework for slum upgrading projects. Journal of Construction Engineering and Management, 140(4): B4014003, ISSN 0733-9364
El-Bibany, H (1997) Parametric constraint management in planning and scheduling: Computational basis. Journal of Construction Engineering and Management, 123(3), pp. 348-353. ISSN 0733-9364
El-Choum, M K (1994) Identification and modelling of construction cost overruns parameters for public infrastructure projects using multivariate statistical methods. PhD thesis, Stevens Institute of Technology, USA.
El-Deeb, K (2024) Energy performance assessment of venetian blinds in south-oriented residential spaces in hot arid desert climates. Construction Innovation, 24(6), pp. 1460-1482. ISSN 1471-4175
El-Diraby, T E and O'Connor, J T (2001) Model for evaluating bridge construction plans. Journal of Construction Engineering and Management, 127(5), pp. 399-405. ISSN 0733-9364
El-Gafy, M and Abdelhamid, T S (2015) Impact of I/D contracts used for expediting Michigan's road construction. Journal of Construction Engineering and Management, 141(7): 5015005, ISSN 0733-9364
El-Gohary, K M; Aziz, R F and Abdel-Khalek, H A (2017) Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8): 04017045, ISSN 0733-9364
El-Kholy, A M and Akal, A Y (2021) Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects. Engineering, Construction and Architectural Management, 28(10), pp. 3014-3040. ISSN 0969-9988
El-Mashaleh, M; O'Brien, W J and Minchin Jr, R E (2006) Firm performance and information technology utilization in the construction industry. Journal of Construction Engineering and Management, 132(5), pp. 499-507. ISSN 0733-9364
El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.
El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction, 25(2), pp. 225-246. ISSN 1366-4387
El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364
El-Rayes, K (2001) Optimum planning of highway construction under A+B bidding method. Journal of Construction Engineering and Management, 127(4), pp. 261-269. ISSN 0733-9364
El-Rayes, K and Jun, D H (2009) Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), pp. 1172-1180. ISSN 0733-9364
El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364
El-Rayes, K and Moselhi, O (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(4), pp. 433-446. ISSN 01446193
El-Rayes, K and Moselhi, O (2001) Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, 127(2), pp. 125-131. ISSN 0733-9364
El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364
El-Rayes, K; Ramanathan, R and Moselhi, O (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), pp. 201-210. ISSN 01446193
El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.
El-Sabek, L M (2017) Framework for managing integration challenges of production planning and control in international construction mega-projects. PhD thesis, University of Toronto, Canada.
El-Sabek, L M and McCabe, B Y (2018) Framework for managing integration challenges of last planner system in IMPs. Journal of Construction Engineering and Management, 144(5): 04018022, ISSN 0733-9364
El-Sabek, L M and McCabe, B Y (2018) Coordination challenges of production planning in the construction of international mega-projects in the middle East. International Journal of Construction Education and Research, 14(2), pp. 118-40. ISSN 1557-8771
El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175
El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(5), pp. 639-653. ISSN 0969-9988
El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.
El-Sayegh, S M and Al-Haj, R (2017) A new framework for time-cost trade-off considering float loss impact. Journal of Financial Management of Property and Construction, 22(1), pp. 20-36. ISSN 1366-4387
El-Sayegh, S M and Rabie, M M (2016) Modified price plus time bi-parameter bidding model incorporating float loss impact. International Journal of Construction Management, 16(4), pp. 267-280. ISSN 1562-3599
El-Sersy, A H E (1992) An intelligent data model for schedule updating. PhD thesis, University of California, Berkeley, USA.
ElAlem, M A; Mahdi, I M; Mohamadien, H A and Hosny, S (2025) Forecasting scope creep in Egyptian construction projects: An evaluation using artificial neural network (ANN) and random forest models. International Journal of Construction Management, 25(16), pp. 2082-2101. ISSN 1562-3599
ElMenshawy, M and Marzouk, M (2021) Automated BIM schedule generation approach for solving time–cost trade-off problems. Engineering, Construction and Architectural Management, 28(10), pp. 3346-3367. ISSN 0969-9988
ElZomor, M A (2017) Development of the project definition rating index (PDRI) for small infrastructure projects. PhD thesis, Arizona State University, USA.
Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(2), pp. 199-211. ISSN 1466433X
Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364
Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387
Elazouni, A and Salem, O A (2011) Progress monitoring of construction projects using pattern recognition techniques. Construction Management and Economics, 29(4), pp. 355-370. ISSN 1466433X
Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2007) Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), pp. 86-90. ISSN 0733-9364
Elbashbishy, T and El-Adaway, I H (2026) Assessing the criticality of construction trades: Skilled labor shortages and their cost and schedule impacts. Journal of Construction Engineering and Management, 152(1): 04025230, ISSN 0733-9364
Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988
Elbeltagi, E; Hegazy, T and Eldosouky, A (2004) Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130(4), pp. 534-541. ISSN 0733-9364
Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193
Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364
Eldin, N N (1991) Management of engineering/design phase. Journal of Construction Engineering and Management, 117(1), pp. 163-175. ISSN 0733-9364
Eldin, N N (1999) Impact of employee, management, and process issues on constructability implementation. Construction Management and Economics, 17(6), pp. 711-720. ISSN 01446193
Eldosoky, A I (1987) Dealing with uncertainty in construction projects with particular reference to Egypt. PhD thesis, University of Manchester, UK.
Elfving, J A (2003) Exploration of opportunities to reduce lead times for engineered-to-order products. PhD thesis, University of California, Berkeley, USA.
Elfving, J A (2022) A decade of lessons learned: Deployment of lean at a large general contractor. Construction Management and Economics, 40(7-8), pp. 548-561. ISSN 01446193
Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175
Elghaish, F; Matarneh, S T and Alhusban, M (2022) The application of "deep learning" in construction site management: Scientometric, thematic and critical analysis. Construction Innovation, 22(3), pp. 580-603. ISSN 1471-4175
Elgrari, O (2011) The role of technology transfer in improving manpower capability in private house building companies in Libya. PhD thesis, University of Salford, UK.
Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.
Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364
Elias, A M (1998) Development of a systematic approach for the inclusion of accident risk factors in the calculation of road user costs for construction zones. PhD thesis, University of Florida, USA.
Elinwa, A U and Joshua, M (2001) Time-overrun factors in Nigerian construction industry. Journal of Construction Engineering and Management, 127(5), pp. 419-425. ISSN 0733-9364
Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(5), pp. 2106-2129. ISSN 0969-9988
Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.
Elliott, B R (2000) Investigation of the construction scheduling communication process: Problems, foreman's role, means of improvement and use of information technology. PhD thesis, University of Florida, USA.
Ellis, L; Martin, H and Ramcharitar, S (2019) Factors influencing triple constraints in public sector projects in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 157-169. ISSN 17514304
Ellis, R C T; Wood, G D and Thorpe, T (2004) Technology-based learning and the project manager. Engineering, Construction and Architectural Management, 11(5), pp. 358-365. ISSN 0969-9988
Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.
Elmasry, M; Zayed, T and Hawari, A (2019) Multi-objective optimization model for inspection scheduling of sewer pipelines. Journal of Construction Engineering and Management, 145(2): 04018129, ISSN 0733-9364
Elnaas, E (2014) The decision to use off-site manufacturing systems for house-building projects in the UK. PhD thesis, University of Brighton, UK.
Elsayed, M A A; Lastovets, N; Pistore, L and Pelsmakers, S (2024) Summer-time performance of Finnish housing: Poe of five apartments. International Journal of Building Pathology and Adaptation, 43(8), pp. 1-25. ISSN 2398-4708
Elsayegh, A (2021) Collaborative planning in the construction industry: A holistic framework for assessing collaborative planning practices and predicting project performance. PhD thesis, Missouri University of Science and Technology, USA.
Elzarka, H M and Bell, L C (1995) Object-oriented methodology for materials-management systems. Journal of Construction Engineering and Management, 121(4), pp. 438-445. ISSN 0733-9364
Emam, H (2021) Optimising project controls for construction using BIM and Big Data Analytics. PhD thesis, University of Bolton, UK.
Emam, H; Farrell, P and Ahmed, S (2016) Formulating a linear scheduling development index. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 188-198. ISSN 17514304
Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.
Emmitt, S (2005) Integrating teaching and research in an architectural technology undergraduate model. Journal of Engineering, Design and Technology, 3(2), pp. 164-179. ISSN 1726-0531
Emmitt, S (2006) Investigating the synergy between teaching and research in a teaching-led university: The case of an architectural technology undergraduate programme. Architectural Engineering and Design Management, 2(1-2), pp. 61-72. ISSN 1745-2007
Emmitt, S (2016) The construction design manager – a rapidly evolving innovation. Architectural Engineering and Design Management, 12(2), pp. 138-148. ISSN 1745-2007
Emsley, M W (2001) A model to optimize single tower crane location within a construction site. PhD thesis, Loughborough University, UK.
Emsoff, J E (1994) An object-oriented environment for the visual integration of project scheduling data. PhD thesis, Texas A&M University, USA.
Emuze, F; Norgbey, W S and Smallwood, J (2015) Provincial roads capex programme in South Africa: Planning and management inadequacies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Emuze, F and Ravu, P (2014) Optimism bias, pathogens and cost overrun: The case of an RTS project in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Emuze, F; Smallwood, J and Han, S (2014) Factors contributing to non-value adding activities in South African construction. Journal of Engineering, Design and Technology, 12(2), pp. 223-243. ISSN 1726-0531
Emuze, F and Smallwood, J J (2012) Bridging public works project performance gaps in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 111-118. ISSN 17514312
Emuze, F A (2011) Performance improvement in South African construction. PhD thesis, Nelson Mandela Metropolitan University, South Africa.
Emuze F, S J (2013) Construction motor vehicle accidents in South Africa: Causes and impact. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Endut, I R (2008) Framework for minimising time overruns of Malaysian construction projects. PhD thesis, Glasgow Caledonian University, UK.
English, J (2002) Managing cultural differences to improve industrial efficiency. Building Research & Information, 30(3), pp. 196-204. ISSN 0961-3218
English, J and Hay, P (2015) Black South African women in construction: Cues for success. Journal of Engineering, Design and Technology, 13(1), pp. 144-164.
Ensafi, Mahnaz (2022) Work order prioritization using neural networks to improve building operation. PhD thesis, Virginia Tech, USA.
Ensar, A and Selin, G (2021) Individual and organisational level drivers and barriers to building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 89-109. ISSN 1823-6499
Enshassi, A (1996) Materials control and waste on building sites. Building Research & Information, 24(1), pp. 31-34. ISSN 0961-3218
Enshassi, A (1997) Construction safety issues in Gaza Strip. Building Research & Information, 25(6), pp. 370-373. ISSN 0961-3218
Enshassi, A; Abdul-Aziz, A R and Abushaban, S (2012) Analysis of contractors performance in Gaza Strip construction projects. International Journal of Construction Management, 12(2), pp. 65-79. ISSN 1562-3599
Enshassi, A; Al-Najjar, J and Kumaraswamy, M (2009) Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), pp. 126-151. ISSN 1366-4387
Enshassi, A; Ayash, A and Mohamed, S (2018) Factors driving contractors to implement energy management strategies in construction projects. Journal of Financial Management of Property and Construction, 23(3), pp. 295-311. ISSN 1366-4387
Enshassi, A; Ayash, A and Mohamed, S (2018) Key barriers to the implementation of energy-management strategies in building construction projects. International Journal of Building Pathology and Adaptation, 36(1), pp. 15-40. ISSN 23984708
Enshassi, A; Kumaraswamy, M and Jomah, A N (2010) Significant factors causing time and cost overruns in construction projects in the Gaza Strip: Contractors' perspective. International Journal of Construction Management, 10(1), pp. 35-60. ISSN 1562-3599
Enshassi, A; Saleh, N and Mohamed, S (2019) Application level of lean construction techniques in reducing accidents in construction projects. Journal of Financial Management of Property and Construction, 24(3), pp. 274-293. ISSN 1366-4387
Enshassi, A and Shaath, K (2007) Training assessment of palestinian contractors. Journal of Construction in Developing Countries, 12(1), pp. 39-58. ISSN 1823-6499
Enshassi, M S A; Walbridge, S; West, J S and Haas, C T (2020) Dynamic and proactive risk-based methodology for managing excessive geometric variability issues in modular construction projects using Bayesian theory. Journal of Construction Engineering and Management, 146(2): 04019096, ISSN 0733-9364
Era, B E; Satyanarayana Reddy, C N V and Mohan, V K (2024) Construction companies development programme: The case of URRAP in south regional state, Ethiopia. International Journal of Construction Management, 24(12), pp. 1326-1338. ISSN 1562-3599
Ergen, E (2005) Formalization of life-cycle data management of engineered-to-order components using advanced tracking technologies. PhD thesis, Carnegie Mellon University, USA.
Eriksson, P E and Laan, A (2007) Procurement effects on trust and control in client-contractor relationships. Engineering, Construction and Architectural Management, 14(4), pp. 387-399. ISSN 0969-9988
Eriksson, P E; Volker, L; Kadefors, A; Lingegård, S; Larsson, J and Rosander, L (2019) Collaborative procurement strategies for infrastructure projects: A multiple-case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(5), pp. 197-205. ISSN 17514304
Eriksson, T (2015) Developing routines in large inter-organisational projects: A case study of an infrastructure megaproject. Construction Economics and Building, 15(3), pp. 4-18. ISSN 2204-9029
Erlita, A; Amin, M and Bintoro, B P K (2023) Multiphase project risk management on food factory building construction: Consultant perspective. Journal of Construction in Developing Countries, 28(1), pp. 1-17. ISSN 1823-6499
Esa, M (2015) The influence of project manager’s cognitive styles on project success in the Malaysian construction industry. PhD thesis, University of Malaya, Malaysia.
Eshtehardian, E; Afshar, A and Abbasnia, R (2008) Time-cost optimization: Using GA and fuzzy sets theory for uncertainties in cost. Construction Management and Economics, 26(7), pp. 679-691. ISSN 1466433X
Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.
Esmaeili, B and Hallowell, M (2013) Integration of safety risk data with highway construction schedules. Construction Management and Economics, 31(6), pp. 528-541. ISSN 1466433X
Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. II: Predicting safety outcomes using generalized linear models. Journal of Construction Engineering and Management, 141(8): 04015022, ISSN 0733-9364
Esmalian, A (2022) Understanding social equity in infrastructure systems resilience. PhD thesis, Texas A&M University, USA.
Esteves, I C A; Medeiros-Junior, R A and Medeiros, M H F (2018) NDT for bridges durability assessment on urban-industrial environment in Brazil. International Journal of Building Pathology and Adaptation, 36(5), pp. 500-515. ISSN 23984708
Etemadinia, H and Tavakolan, M (2021) Using a hybrid system dynamics and interpretive structural modeling for risk analysis of design phase of the construction projects. International Journal of Construction Management, 21(1), pp. 93-112. ISSN 1562-3599
Etmektzoglou, Apostolos (2013) The impact of the financial crisis on industrial relations in Greek industry. DBA thesis, Nottingham Trent University, UK.
Evans, R C; Kaka, A P and Lewis, J (1997) Adopting a semi-ideographic approach to cash flow forecasting. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Evans, S; Liddiard, R and Steadman, P (2019) Modelling a whole building stock: Domestic, non-domestic and mixed use. Building Research & Information, 47(2), pp. 156-172. ISSN 0961-3218
Ewin, N A; Oxley, R and Poole, F (1990) Advanced applications software for speculative housing companies. Construction Management and Economics, 8(2), pp. 109-133. ISSN 01446193
Ewuga, D; Opiyo, N and Oyegoke, A S (2025) An evaluation of the delivery of quantity surveying degree apprenticeship in UK universities. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(3), pp. 180-187. ISSN 17514304
Eybpoosh, M; Dikmen, I and Birgonul, M T (2011) Identification of risk paths in international construction projects using structural equation modeling. Journal of Construction Engineering and Management, 137(12), pp. 1164-1175. ISSN 0733-9364
Eyiah, A K (2003) Construction bank in a developing country: The way forward. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Eyiah, A K (2004) Financing small and medium scale construction firms in Ghana: A framework for improvement. PhD thesis, University of Manchester, UK.
Eyiah, A K and Cook, P (2003) Financing small and medium-scale contractors in developing countries: A Ghana case study. Construction Management and Economics, 21(4), pp. 357-367. ISSN 01446193
Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364
Ezeoke, G C (2021) Duration, control, and success factors of Nigerian public infrastructure projects. PhD thesis, Walden University, USA.
Ezzeddine, A; Shehab, L; Lucko, G and Hamzeh, F (2022) Forecasting construction project performance with momentum using singularity functions in LPS. Journal of Construction Engineering and Management, 148(8): 04022063, ISSN 0733-9364
Fadiya, O O (2012) Development of an integrated decision analysis framework for selecting ICT-based logistics systems in the construction industry. PhD thesis, University of Wolverhampton, UK.
Fagbenro, R. K.; Sunindijo, R. Y. and Illankoon, C. (2026) Prefabrication in construction: A pathway to improved mental health and well-being for workers. Engineering, Construction and Architectural Management, 33(15), pp. 249-275. ISSN 0969-9988
Fahmie, M M (1994) A knowledge-based expert system approach to analyze and evaluate highway construction schedules. PhD thesis, Florida University, USA.
Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.
Fahmy, A; Hassan, T; Bassioni, H and McCaffer, R (2020) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 313-330. ISSN 2044-124X
Faircloth, Adam D (2022) Development of a non-destructive evaluation system for mass timber panels. MPhil thesis, Griffith University, Australia.
Famiyeh, S; Amoatey, C T; Adaku, E and Agbenohevi, C S (2017) Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana. Journal of Engineering, Design and Technology, 15(2), pp. 181-198.
Fan, C; Binchao, D and Yin, Y (2023) Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: An integrated ISM–MICMAC approach. Engineering, Construction and Architectural Management, 30(7), pp. 2991-3013. ISSN 0969-9988
Fan, C and Li, X (2025) Exploring effective incentive policies for sustainable development of green buildings in China: Based on evolutionary game theory and numerical simulation analysis. Engineering, Construction and Architectural Management, 32(5), pp. 3326-3348. ISSN 0969-9988
Fan, L C N (2001) Strategic quality management for construction organisations. DBA thesis, Brunel University, UK.
Fan, S (2009) The effect of using group decision support systems on the processes and outcomes of value management studies. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Fan, S L (2012) Modified time impact analysis method. Journal of Construction Engineering and Management, 138(2), pp. 227-233. ISSN 0733-9364
Fan, S L and Tserng, H P (2006) Object-oriented scheduling for repetitive projects with soft logics. Journal of Construction Engineering and Management, 132(1), pp. 35-48. ISSN 0733-9364
Fan, S L; Yeh, I C and Chi, W S (2021) Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis. Journal of Construction Engineering and Management, 147(7): 04021050, ISSN 0733-9364
Fang, X; Yang, L; Zhang, C; Yang, J and Zhou, W (2025) Large diameter shafts in fractured strata: Equipment and construction procedures. Journal of Construction Engineering and Management, 151(9): 06025001, ISSN 0733-9364
Farag, F; McDermott, P and Huelin, C A (2016) The development of an activity zone conceptual framework to improve social value implementation in construction projects using human activity systems. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Farahani, A; Wallbaum, H and Dalenbäck, J O (2019) Optimized maintenance and renovation scheduling in multifamily buildings: a systematic approach based on condition state and life cycle cost of building components. Construction Management and Economics, 37(3), pp. 139-155. ISSN 01446193
Farahani, A; Wallbaum, H and Dalenbäck, J O (2020) Cost-optimal maintenance and renovation planning in multifamily buildings with annual budget constraints. Journal of Construction Engineering and Management, 146(3): 04020009, ISSN 0733-9364
Faraji, A; Homayoon Arya, S; Ghasemi, E; Rashidi, M; Perera, S; Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(1), pp. 384-406. ISSN 1471-4175
Farbarik, J J (1994) Evaluation of the efficacy of using bid data to predict construction cost overruns. PhD thesis, University of Washington, USA.
Faridi, A S and El-Sayegh, S M (2006) Significant factors causing delay in the UAE construction industry. Construction Management and Economics, 24(11), pp. 1167-1176. ISSN 1466433X
Farnsworth, C B; Beveridge, S; Miller, K R and Christofferson, J P (2015) Application, advantages, and methods associated with using BIM in commercial construction. International Journal of Construction Education and Research, 11(3), pp. 218-236. ISSN 1557-8771
Farooq, M. and Paracha, A. T. (2026) Cost prediction of road construction projects in Pakistan using machine learning. International Journal of Construction Management, 26(8), pp. 1442-1470. ISSN 1562-3599
Farrell, P and Middlemass, R (2005) Barriers to disabled students in built environment degree programmes. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Farshchian, M M and Heravi, G (2018) Probabilistic assessment of cost, time, and revenue in a portfolio of projects using stochastic agent-based simulation. Journal of Construction Engineering and Management, 144(5): 4018028, ISSN 0733-9364
Farshchian, M M; Heravi, G and Abourizk, S (2017) Optimizing the owner's scenarios for budget allocation in a portfolio of projects using agent-based simulation. Journal of Construction Engineering and Management, 143(7): 04017022, ISSN 0733-9364
Fateh, M A M; Supian, A N and Goh, C S (2024) Managing emotional intelligence of construction players during COVID-19 in Malaysia. Journal of Construction in Developing Countries, 29(1), pp. 191-210. ISSN 1823-6499
Fathi, M (2020) Public-private partnership contract framework development and project performance analysis compared to design-build in the US highway projects. PhD thesis, University of Nevada, Las Vegas, USA.
Fathi, M and Shrestha, P P (2022) Public-private partnership project performance analysis compared to design-build in highway projects. Journal of Construction Engineering and Management, 148(11): 04022118, ISSN 0733-9364
Fathi, M S (2009) Micro- and macro-level context-aware information delivery for construction programme managers. PhD thesis, Loughborough University, UK.
Faubel, C.; Mowen, D.; Miri, M.; Demarquet Alban, U.; Martinez-Molina, A. and Alamaniotis, M. (2026) Multimodal transformer models for real-time estimation of indoor environmental quality in educational settings. Smart and Sustainable Built Environment, pp. 1-37. ISSN 2046-6099
Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system. PhD thesis, Eindhoven University of Technology, Netherlands.
Fazeli, A; Banihashemi, S; Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: The resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(5), pp. 1896-1922. ISSN 0969-9988
Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193
Fazlipour, M and Samadzad, M (2026) Engineering and economic feasibility of a new prefabrication ecosystem for steel construction in diverse low-rise residential buildings. Journal of Construction Engineering and Management, 152(2): 04025238, ISSN 0733-9364
Federico, D A; Berta, M; Bottero, M; Mallia, G and Morgese, V (2024) Multicriteria-decision support for master plan scheduling: Urban regeneration of an industrial area in Northern Italy. Construction Management and Economics, 42(5), pp. 476-501. ISSN 01446193
Feghali, M and Raidén, A B (2016) Project management practice within the Lebanese real estate industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Feldbauer, R R (2019) Mindful project management: a framework to enhance underperformance managing large hospital builds by incorporating principles adapted from High Reliability Organizations. PhD thesis, University of Liverpool, UK.
Feldmann, F G (2022) Novel perspectives on sustainable value creation: Challenging the status quo by implementing advanced technologies into supply chain processes. PhD thesis, Friedrich-Alexander-Universitaet Erlangen-Nuernberg, Germany.
Fellows, R and Liu, A M M (2012) Managing organizational interfaces in engineering construction projects: Addressing fragmentation and boundary issues across multiple interfaces. Construction Management and Economics, 30(8), pp. 653-671. ISSN 1466433X
Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Fente, J; Schexnayder, C and Knutson, K (2000) Defining a probability distribution function for construction simulation. Journal of Construction Engineering and Management, 126(3), pp. 234-241. ISSN 0733-9364
Ferguson, D W (1993) Public works program management using owner-consultant partnerships: Organizational factors influencing effectiveness. PhD thesis, Claremont Graduate University, USA.
Fernandez-Solis, J L (2013) Building construction: A deterministic non-periodic flow-a case study of chaos theories in tracking production flow. Architectural Engineering and Design Management, 9(1), pp. 21-48. ISSN 1745-2007
Fernandez-Solis, J L; Porwal, V; Lavy, S; Shafaat, A; Rybkowski, Z K; Son, K and Lagoo, N (2013) Survey of motivations, benefits, and implementation challenges of last planner system users. Journal of Construction Engineering and Management, 139(4), pp. 354-360. ISSN 0733-9364
Fernández, A I; Jarufe, J; Segarra, P and Cavieres, P (2025) Management of construction planning process in massive underground mining by integrating LPS and cit through action research. Journal of Construction Engineering and Management, 151(5): 04025024, ISSN 0733-9364
Fernández-Solís, J L; Rybkowski, Z K; Xiao, C; Lü, X and Chae, L S (2015) General contractor's project of projects: a meta-project: Understanding the new paradigm and its implications through the lens of entropy. Architectural Engineering and Design Management, 11(3), pp. 213-242. ISSN 1745-2007
Ferreira Bastos, M; Loforte Ribeiro, F and Cardoso Teixeira, J (2005) Estimating of capital cost of underground car parking project. Journal of Financial Management of Property and Construction, 10(2), pp. 126-132. ISSN 1366-4387
Filippi, Giancarlo Azevedo de (2017) Method for production planning and deadline management of real estate ventures. PhD thesis, Universidade de São Paulo, Brazil.
Fini, A A F; Akbarnezhad, A; Rashidi, T H and Waller, S T (2018) Dynamic programming approach toward optimization of workforce planning decisions. Journal of Construction Engineering and Management, 144(2): 04017113, ISSN 0733-9364
Finnie, D (2012) Contract delay what is it and how are we performing? Construction Economics and Building, 12(1), pp. 83-91. ISSN 2204-9029
Finnimore, B (1986) The industrialisation of building: building systems and social housing in postwar Britain 1942 to 1975. PhD thesis, University College London, UK.
Fireman, M C T; Saurin, T A; Formoso, C T; Koskela, L and Tommelein, I D (2023) Slack in production planning and control: A study in the construction industry. Construction Management and Economics, 41(3), pp. 256-276. ISSN 01446193
Firouzi, A and Khayyati, M (2020) Bayesian updating of Copula-based probabilistic project-duration model. Journal of Construction Engineering and Management, 146(5): 04020046, ISSN 0733-9364
Firouzi, A and Vahdatmanesh, M (2019) Applicability of financial derivatives for hedging material price risk in highway construction. Journal of Construction Engineering and Management, 145(5): 04019023, ISSN 0733-9364
Firouzi, A; Yang, W and Li, C Q (2016) Prediction of total cost of construction project with dependent cost items. Journal of Construction Engineering and Management, 142(12): 04016072, ISSN 0733-9364
Fischer, M A and Aalami, F B (1996) Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management, 122(4), pp. 337-347. ISSN 0733-9364
Fisher, D J and Rajan, N (1996) Automated constructibility analysis of work-zone traffic-control planning. Journal of Construction Engineering and Management, 122(1), pp. 36-43. ISSN 0733-9364
Fisher, W H (2017) The use of arbitration in the construction industry in England and Wales: an evaluation of its continuing role following the Arbitration Act 1996. PhD thesis, University of Wolverhampton, UK.
Fitch, T; Keki, I and Smyth, H (2010) Power and perceptions in business development: The case of a major contractor and design consultancies in civil engineering influencer and referral markets. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Fitzpatrick, T and Molloy, J (2014) The role of NGOs in building sustainable community resilience. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 292-304. ISSN 1759-5916
Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.
Flores, M and Mourgues, C (2024) Impact of using a formalized methodology for conflict detection based on 4D-BIM. Journal of Construction Engineering and Management, 150(7): 04024059, ISSN 0733-9364
Flores Salas, A (2016) Evaluation of the use of lightweight concrete panels for post disaster house reconstruction using Building Information Modelling. PhD thesis, University of Manchester, UK.
Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771
Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.
Folorunso, C O (2021) Analysis of effectiveness of wooden floor finishes in some residential buildings in Lagos, Nigeria. International Journal of Building Pathology and Adaptation, 39(5), pp. 756-765. ISSN 23984708
Fondahl, J W (1991) The development of the construction engineer: Past progress and future problems. Journal of Construction Engineering and Management, 117(3), pp. 380-392. ISSN 0733-9364
Forbes, D; El-Haram, M; Horner, M; Hatton, D and Evans, A (2009) Estimating the labour demand for housing construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Forcada, N; Gangolells, M; Casals, M and Macarulla, M (2017) Factors affecting rework costs in construction. Journal of Construction Engineering and Management, 143(8): 04017032, ISSN 0733-9364
Forcada, N; MacArulla, M; Gangolells, M and Casals, M (2014) Assessment of construction defects in residential buildings in Spain. Building Research & Information, 42(5), pp. 629-640. ISSN 0961-3218
Ford, D N (2002) Achieving multiple project objectives through contingency management. Journal of Construction Engineering and Management, 128(1), pp. 30-39. ISSN 0733-9364
Ford, D N; Anderson, S D; Damron, A J; De Las Casas, R; Gokmen, N and Kuennen, S T (2004) Managing constructibility reviews to reduce highway project durations. Journal of Construction Engineering and Management, 130(1), pp. 33-42. ISSN 0733-9364
Ford, D N and Bhargav, S (2006) Project management quality and the value of flexible strategies. Engineering, Construction and Architectural Management, 13(3), pp. 275-289. ISSN 0969-9988
Forgues, Daniel (2008) Using boundary objects to generate better value in the construction industry: Interpreting cases from an activity theory perspective. PhD thesis, University of Salford, UK.
Forman, M (2013) Inertia and change: Lean construction and health and safety work on construction sites. Construction Management and Economics, 31(6), pp. 647-660. ISSN 1466433X
Forman, T and Tweed, C (2014) Solid wall insulation retrofit in UK dwellings: Critical factors affecting management and quality. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Formoso, C T; Tzortzopoulos, P and Liedtke, R (2002) A model for managing the product development process in house building. Engineering, Construction and Architectural Management, 9(5-6), pp. 419-432. ISSN 0969-9988
Foster, S R (2020) Management strategies for improving construction industry ethics. PhD thesis, Walden University, USA.
France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects. PhD thesis, University of Texas at Austin, USA.
Francis, A (2013) The chronographical approach for construction project modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 188-204. ISSN 17514312
Francis, A (2016) A chronographic protocol for modelling construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 168-177. ISSN 17514304
Francis, A (2017) Simulating uncertainties in construction projects with chronographical scheduling logic. Journal of Construction Engineering and Management, 143(1): 04016085, ISSN 0733-9364
Francis, A; Bibai, J and Miresco, E (2013) Simulation of scheduling logic using dynamic functions. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 145-158. ISSN 17514312
Francis, M; Ramachandra, T and Rotimi, J O B (2016) Strategies to minimise the effects of delayed payments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 199-207. ISSN 17514304
Franco-Duran, D M and De La Garza, J M (2020) Performance of resource-constrained scheduling heuristics. Journal of Construction Engineering and Management, 146(4): 04020026, ISSN 0733-9364
Franco-Duran, D M and Garza, J M D L (2019) Review of resource-constrained scheduling algorithms. Journal of Construction Engineering and Management, 145(11): 03119006, ISSN 0733-9364
Francom, T C (2015) Performance of the construction manager at risk (CMAR) delivery method applied to pipeline construction projects. PhD thesis, Arizona State University, USA.
Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.
Franz, B; Leicht, R; El Asmar, M and Molenaar, K (2022) Methodological consistency for quantitative analysis and reporting in project delivery system performance research. Journal of Construction Engineering and Management, 148(9): 04022080, ISSN 0733-9364
Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364
Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364
Franz, B and Roberts, B A M (2022) Thematic analysis of successful and unsuccessful project delivery teams in the building construction industry. Journal of Construction Engineering and Management, 148(3): 05022001, ISSN 0733-9364
Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.
Franz, B W; Leicht, R M and Riley, D R (2013) Project impacts of specialty mechanical contractor design involvement in the health care industry: Comparative case study. Journal of Construction Engineering and Management, 139(9), pp. 1091-1097. ISSN 0733-9364
França, A J G L and Ornstein, S W (2022) The role of the built environment in updating design requirements in the post-pandemic scenario: A case study of selected diagnostic facilities in Brazil. Architectural Engineering and Design Management, 18(5), pp. 671-689. ISSN 1745-2007
Frederiksen, N and Gottlieb, S C (2020) From partnership to firm: Hybridity as source of routine change. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Freitas, Andrey Pimentel Aleluia (2018) Risk management methodology in the civil construction industry: Application in micro and small enterprises. PhD thesis, Universidade Federal Fluminense, Brazil.
Frey, Shane (2024) Department of defense project management team leaders: Team dynamics and teamwork strategies during complex construction projects. EdD thesis, University of Massachusetts Global, USA.
Frimpong, Y and Oluwoye, J (2003) Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. Journal of Construction Research, 4(2), pp. 175-187. ISSN 1609-9451
Froese, T M (1992) Integrated computer-aided project management through standard object-oriented models. PhD thesis, Stanford University, USA.
Fu, Y (2019) Organizational governance and value creation: An empirical study in megaproject contexts. PhD thesis, University of Manchester, UK.
Fuentes-Del-burgo, J; Fernández, J P R and Navarro-Astor, E (2024) Kanban applied to construction: A literature review. Construction Economics and Building, 24(4-5), pp. 43-57. ISSN 2204-9029
Fugar, F D K and Agyakwah-Baah, A B (2010) Delays in building construction projects in Ghana. Construction Economics and Building, 10(1-2), pp. 103-116. ISSN 2204-9029
Funches Allen, Dawn (2025) Analyzing factors that contribute to cost overruns on department of defense (dod) contractor programs. DEngr thesis, George Washington University, USA.
Gabai, D S; Haronian, E; Sacks, R; Kennard, N S; Wong, N; Miera, M K and Cloyd, T D (2026) Doubling throughput and halving project durations: Lessons from intel's ocf strategy for project portfolio management. Journal of Construction Engineering and Management, 152(2): 04025256, ISSN 0733-9364
Gaisie, Eric (2021) Social capital and disaster resilience: A case of flooding in informal settlements in Accra, Ghana. PhD thesis, University of Melbourne, Australia.
Gajpal, Y and Elazouni, A (2015) Enhanced heuristic for finance-based scheduling of construction projects. Construction Management and Economics, 33(7), pp. 531-553. ISSN 01446193
Galbraith, G H; Guo, J S and McLean, R C (2000) The effect of temperature on the moisture permeability of building materials. Building Research & Information, 28(4), pp. 245-259. ISSN 0961-3218
Galbraith, P J (1995) The development of a classification system for construction industry clients. PhD thesis, University of Reading, UK.
Galloway, P D (2006) Comparative study of university courses on critical-path method scheduling. Journal of Construction Engineering and Management, 132(7), pp. 712-722. ISSN 0733-9364
Galloway, P D (2006) Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of Construction Engineering and Management, 132(7), pp. 697-711. ISSN 0733-9364
Gama, E C M and Sloan, S C W B (2010) Environmental sustainability in the construction industry in developing countries: A study of embodied energy of low-cost housing. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Gambatese, J A; Pestana, C and Lee, H W (2017) Alignment between lean principles and practices and worker safety behavior. Journal of Construction Engineering and Management, 143(1): 04016083, ISSN 0733-9364
Gambatese, J A and Rajendran, S (2012) Flagger illumination during nighttime construction and maintenance operations. Journal of Construction Engineering and Management, 138(2), pp. 250-257. ISSN 0733-9364
Ganah, A A M (2003) Computer visualisation support for buildability. PhD thesis, Loughborough University, UK.
Gann, D and Senker, P (1998) Construction skills training for the next millennium. Construction Management and Economics, 16(5), pp. 569-580. ISSN 01446193
Gao, H; Zhang, L and Gu, S (2026) Carbon emission efficiency measurement of construction enterprises based on the three-stage DEA-sbm model. Journal of Construction Engineering and Management, 152(4): 04026028, ISSN 0733-9364
Gao, J; Ren, H and Cai, W (2019) Risk assessment of construction projects in China under traditional and industrial production modes. Engineering, Construction and Architectural Management, 26(9), pp. 2147-2168. ISSN 0969-9988
Gao, M Y; Han, J; Yang, Y; Tiong, R L K; Zhao, C and Han, C (2024) BIM-based and IoT-driven smart tracking for precast construction dynamic scheduling. Journal of Construction Engineering and Management, 150(9): 04024117, ISSN 0733-9364
Gao, N and Touran, A (2020) Cost overruns and formal risk assessment program in US rail transit projects. Journal of Construction Engineering and Management, 146(5): 05020004, ISSN 0733-9364
Gao, S; Chan, T K and Hendy, P (2025) Adoption of the digitalised last planner system in infrastructure projects: An Australian case study. Construction Innovation, 25(3), pp. 994-1013. ISSN 1471-4175
Gao, S; Low, S P and Nair, K (2018) Design for manufacturing and assembly (DFMA): A preliminary study of factors influencing its adoption in Singapore. Architectural Engineering and Design Management, 14(6), pp. 440-456. ISSN 1745-2007
Gao, W; Yan, X and Li, T (2024) Influencing factors and critical paths of virtual reality adoption by AEC enterprises based on TOE-SNA. Journal of Construction Engineering and Management, 150(2): 04023162, ISSN 0733-9364
Garcia, G; Golparvar-Fard, M; De La Garza, J M and Fischer, M (2021) Measuring progress and productivity in model-driven engineering for capital project delivery. Journal of Construction Engineering and Management, 147(4): 04021009, ISSN 0733-9364
Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.
Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364
Garrido Martins, C (2019) Assessment of project risks in fast-track construction projects. PhD thesis, University of New Mexico, USA.
Garriss, S (2008) Efficient, usable proof-construction strategies for distributed access-control systems. PhD thesis, Carnegie Mellon University, USA.
Garthwaite, P M and Eckert, C M (2012) Glitches, snags and crises: A study of change in two hospital adaptation projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Gasparin, M (2014) Management of design as a translation process. PhD thesis, University of Leicester, UK.
Gaur, S and Tawalare, A (2024) Assessing the implications of BIM on sustainability of construction projects through design risk management. Built Environment Project and Asset Management, 14(3), pp. 470-489. ISSN 2044-124X
Gauthier, S and Shipworth, D (2015) Behavioural responses to cold thermal discomfort. Building Research & Information, 43(3), pp. 355-370. ISSN 0961-3218
Gavieta, R C and Onate, C E (1997) Building regulations and disaster mitigation: The Philippines. Building Research & Information, 25(2), pp. 120-123. ISSN 0961-3218
Geem, Z W (2010) Multiobjective optimization of time-cost trade-off using harmony search. Journal of Construction Engineering and Management, 136(6), pp. 711-716. ISSN 0733-9364
Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.
Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364
George, T. and Ganesan, V. (2026) Advanced cuttlefish optimizer-random decision forest (acordf) based design of fractional order pid controller for higher-order time-delay system. Journal of Engineering, Design and Technology, 24(4), pp. 1-34. ISSN 1726-0531
George, R (2007) Information flow to support front end planning. PhD thesis, Clemson University, USA.
Georgekutty, C K (2014) Optimization of construction cost in construction materials. Unpublished PhD thesis, Cochin University of Science and Technology, India.
Georgiadou, M C; Greenwood, D; Schiano-Phan, R and Russo, F (2024) Assessing retrofit policies for fuel-poor homes in London. Buildings & Cities, 5(1), pp. 133-149. ISSN 2632-6655
Georgy, M and Basily, S Y (2008) Using genetic algorithms in optimizing construction material delivery schedules. Construction Innovation, 8(1), pp. 23-45. ISSN 1471-4175
Gessford, G N (1966) An investigation of the utility of critical path time and cost analysis as an aid to budgeting and administrative control by construction firms. PhD thesis, University of California, Los Angeles, USA.
Ghadar, K O (2017) An examination of PERT implementation in the Libyan construction industry. PhD thesis, Cardiff Metropolitan University, UK.
Ghaffari, M (2017) The impact of multitasking on critical chain portfolios. PhD thesis, University of Manchester, UK.
Ghafoori, M and Abdallah, M (2025) Multi-criteria decision support model for material and supplier selection in the construction industry. International Journal of Construction Management, 25(4), pp. 409-418. ISSN 1562-3599
Ghanbaripour, A N; Langston, C; Tumpa, R J and Skulmoski, G (2024) Validating and testing a project delivery success model in construction: A mixed-method approach in Australia. Smart and Sustainable Built Environment, 13(3), pp. 532-559. ISSN 2046-6099
Ghanem, A (2007) Real-time construction project progress tracking: A hybrid model for wireless technologies selection, assessment, and implementation. PhD thesis, Florida State University, USA.
Gharaie, E; Wakefield, R and Blismas, N (2010) Explaining the increase in the Australian average house completion time: Activity-based versus workflow-based approach. Construction Economics and Building, 10(4), pp. 34-49. ISSN 2204-9029
Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.
Ghasemi, M; Chakrabortty, R K; Shahabi-Shahmiri, R and Mirnezami, S A (2024) A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem. International Journal of Construction Management, 24(10), pp. 1090-1106. ISSN 1562-3599
Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.
Ghazal, M M and Hammad, A (2022) Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects. International Journal of Construction Management, 22(9), pp. 1632-1646. ISSN 1562-3599
Ghazi Wakili, K; Bundi, R and Binder, B (2004) Effective thermal conductivity of vacuum insulation panels. Building Research & Information, 32(4), pp. 293-299. ISSN 0961-3218
Gherbal, N E M (2015) The influence and evaluation of the project manager's performance in the Libyan construction industry. PhD thesis, Coventry University, UK.
Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.
Gholami Bavil Olyai, Farshid (2018) A framework for enhancing engineering deliverables to improve construction performance in oil and gas projects. PhD thesis, University of Calgary, Canada.
Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts. PhD thesis, Syracuse University, USA.
Ghosh, S; Dickerson, D E and Mills, T (2019) Effect of the Last Planner system® on social interactions among project participants. International Journal of Construction Education and Research, 15(2), pp. 100-117. ISSN 1557-8771
Ghulman, B A (2000) Predicting construction cost growth in ODOT's paving projects using information available at the bidding time. PhD thesis, Oklahoma State University, USA.
Giarchi, G G (1981) Between McAlpine and Polaris: A social inscape study. PhD thesis, University of Glasgow, UK.
Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: Client expectations and drivers. Building Research & Information, 31(2), pp. 146-160. ISSN 0961-3218
Gibbs, D-J (2017) Development of building information models (BIM) to support innovative time management and delay analysis. EngD thesis, Loughborough University, UK.
Gibney, A (1998) Studies in eighteenth-century building history. PhD thesis, Trinity College Dublin, Ireland.
Gibson, G E (1990) Data integration and transfer methodologies in industrial construction. PhD thesis, Auburn University, USA.
Gibson, G E; Kaczmarowski, J H and Lore, H E (1995) Preproject-planning process for capital facilities. Journal of Construction Engineering and Management, 121(3), pp. 312-318. ISSN 0733-9364
Gibson Jr, G E and Gebken Ii, R J (2003) Design quality in pre-project planning: Applications of the project definition rating index. Building Research & Information, 31(5), pp. 346-356. ISSN 0961-3218
Gil, N; Beckman, S and Tommelein, I (2008) Problem-solving base building under uncertainty and ambiguity: Multiple-case study on an airport expansion program. Journal of Construction Engineering and Management, 134(12), pp. 991-1001. ISSN 0733-9364
Gil, N and Tommelein, I D (2003) Using product and process flexibility to cope with project delivery uncertainty. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193
Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.
Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364
Gillich, A (2025) Market transformations: Gas conversion as a blueprint for net zero retrofit. Buildings & Cities, 6(1), pp. 359-377. ISSN 2632-6655
Gillich, A; Sunikka-Blank, M and Ford, A (2017) Lessons for the UK green deal from the US BBNP. Building Research & Information, 45(4), pp. 384-395. ISSN 0961-3218
Gillich, A; Sunikka-Blank, M and Ford, A (2018) Designing an 'optimal' domestic retrofit programme. Building Research & Information, 46(7), pp. 767-778. ISSN 0961-3218
Gilmour, D; Blackwood, D; Falconer, R; Isaacs, J and Simpson, E (2015) The role of sustainability assessment in sustainability management for urban redevelopment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Gkritza, K and Labi, S (2008) Estimating cost discrepancies in highway contracts: Multistep econometric approach. Journal of Construction Engineering and Management, 134(12), pp. 953-962. ISSN 0733-9364
Glass, A (2011) Analysis of building-integrated renewable energy systems in modern UK homes. EngD thesis, University of Manchester, UK.
Glass, J and Pepper, C (2005) Perceptions of precast concrete cladding in the UK market. Architectural Engineering and Design Management, 1(4), pp. 233-246. ISSN 1745-2007
Gledson, B (2015) Investigating the diffusion of 4D BIM innovation. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Gledson, B (2022) Enhanced model of the innovation-decision process, for modular-technological-process innovations in construction. Construction Innovation, 22(4), pp. 1085-1103. ISSN 1471-4175
Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Gledson, B J (2016) Hybrid project delivery processes observed in constructor BIM innovation adoption. Construction Innovation, 16(2), pp. 229-246. ISSN 1471-4175
Gledson, B J (2017) Innovation diffusion within the UK construction sector: a study of the adoption of 4D BIM. PhD thesis, Northumbria University, UK.
Gledson, B J and Greenwood, D (2014) The implementation and use of 4D BIM and virtual construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Godawatte, G A G R (2021) Understanding the cost overrun causation in construction megaprojects: a grounded systems thinking approach. PhD thesis, Heriot-Watt University, UK.
Goedert, J D and Rokooei, S (2016) Project-based construction education with simulations in a gaming environment. International Journal of Construction Education and Research, 12(3), pp. 208-223. ISSN 1557-8771
Goedert, J D and Sekpe, V D (2013) Decision support system-enhanced scheduling in matrix organizations using the analytic hierarchy process. Journal of Construction Engineering and Management, 139(11): 5013003, ISSN 0733-9364
Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175
Golizadeh, H; Banihashemi, S; Sadeghifam, A N and Preece, C (2017) Automated estimation of completion time for dam projects. International Journal of Construction Management, 17(3), pp. 197-209. ISSN 1562-3599
Gomes, Helton Cristiano (2013) Multi-objective optimization algorithms for the activity sequencing problem in steel construction projects. PhD thesis, Universidade Federal de Ouro Preto, Brazil.
Gondia, A; Siam, A; El-Dakhakhni, W and Nassar, A H (2020) Machine learning algorithms for construction projects delay risk prediction. Journal of Construction Engineering and Management, 146(1): 04019085, ISSN 0733-9364
Gonzales, S (2022) Corporate and project governance requiring certification for meeting planned. DBA thesis, Northcentral University, USA.
Gonzalez-Quevedo, A A (1991) Sensitivity analysis of construction simulation. PhD thesis, Purdue University, USA.
González, P; González, V; Molenaar, K and Orozco, F (2014) Analysis of causes of delay and time performance in construction projects. Journal of Construction Engineering and Management, 140(1): 04013027, ISSN 0733-9364
González, V; Alarcón, L F; Maturana, S; Mundaca, F and Bustamante, J (2010) Improving planning reliability and project performance using the reliable commitment model. Journal of Construction Engineering and Management, 136(10), pp. 1129-1139. ISSN 0733-9364
González-Cruz, M C; Ballesteros-Pérez, P; Lucko, G and Zhang, J X (2022) Critical duration index: Anticipating project delays from deterministic schedule information. Journal of Construction Engineering and Management, 148(11): 04022121, ISSN 0733-9364
Gordon, C M (1994) Choosing appropriate construction contracting method. Journal of Construction Engineering and Management, 120(1), pp. 196-210. ISSN 0733-9364
Gorgolewski, M (2008) Designing with reused building components: Some challenges. Building Research & Information, 36(2), pp. 175-188. ISSN 0961-3218
Gormley-Gallagher, A.; Amezaga, J.; Shucksmith, J.; Savic, D.; Templeton, M.; McAdam, E. and Jeffrey, P. (2015) Briefing: Negotiating value at the research-practice interface in the water sector. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(1), pp. 8-11. ISSN 1751-4304
Gorse, C A (2004) Monitoring, planning and tracking: Delay, disruption and legal risk management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Gorse, C A; Ellis, R and Hudson-Tyreman, A (2005) Prospective delay analysis and adjudication. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Gosling, J; Towill, D and Naim, M (2012) Learning how to eat an elephant: Implementing supply chain management principles. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Gouda Mohamed, A; Helmy Ammar, M and Nabawy, M (2023) Risks assessment using structural equation modeling: Mega housing projects construction in Egypt. International Journal of Construction Management, 23(16), pp. 2717-2728. ISSN 1562-3599
Gould, C H (1988) Rolling fours: Novel work schedule. Journal of Construction Engineering and Management, 114(4), pp. 577-593. ISSN 0733-9364
Gould, N and King, C (2010) The mediation of construction disputes: Recent research. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(1), pp. 29-39. ISSN 17514312
Gounden, S (1996) Reconstruction and development in South Africa: The construction industry and related procurement reform. Journal of Construction Procurement, 2(1), pp. 3-10. ISSN 1358-9180
Govender, N; Laryea, S and Watermeyer, R (2025) Blueprint to success: Project managers' perspectives on key factors influencing construction document quality in South Africa. Journal of Construction Engineering and Management, 151(11): 05025015, ISSN 0733-9364
Gowthaman, M; Gamage, I and Karunaratne, T (2025) Framework for managing deficiencies and inefficiencies in quantity surveying-related software implementation. Construction Economics and Building, 25(2), pp. 192-214. ISSN 2204-9029
Grady, K (1980) The provision of public buildings in the West Riding of Yorkshire, c.1600-1840. PhD thesis, University of Leeds, UK.
Graham, B and Thomas, K (2006) Knowledge management in Irish construction: The role of CPD accreditation. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.
Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.
Grassie, D; Schwartz, Y; Symonds, P; Korolija, I; Mavrogianni, A and Mumovic, D (2022) Energy retrofit and passive cooling: Overheating and air quality in primary schools. Buildings & Cities, 3(1), pp. 204-225. ISSN 2632-6655
Grau, D and Back, W E (2015) Predictability index: Novel metric to assess cost and schedule performance. Journal of Construction Engineering and Management, 141(12): 04015043, ISSN 0733-9364
Grau, D; Cruz Rios, F and Sherman, R (2021) Project validation: A set-based and concurrent design approach to inform owner's authorization decision on complex projects. Journal of Construction Engineering and Management, 147(10): 04021132, ISSN 0733-9364
Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193
Gray, C and Flanagan, R (1984) US productivity and fast tracking starts on the drawing board. Construction Management and Economics, 2(2), pp. 133-144. ISSN 01446193
Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X
Greenwood, D; Hogg, K and Kan, S (2005) Subcontractors' liability for project delay. Journal of Financial Management of Property and Construction, 10(2), pp. 107-114. ISSN 1366-4387
Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Greenwood, D J; Osborne, A N and Aggiag, M A (2001) A comparative analysis of administrative delays in hospital buildings. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Greenwood, D J and Shaglouf, A A (1997) Comparison between planned and actual durations in medium sized building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Grenzfurtner, W and Gronalt, M (2021) Continuous improvement of the industrialised housebuilding order fulfilment process. Construction Innovation, 21(1), pp. 22-39. ISSN 1471-4175
Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.
Gribble, S J; Scott, D; Mawdesley, M and Al-Jibouri, S (2006) Learning to be real engineers: The dam game simulation. Architectural Engineering and Design Management, 2(1-2), pp. 101-114. ISSN 1745-2007
Griffin, G S (1996) Complexity theory in construction management. PhD thesis, Colorado State University, USA.
Griffith, A (1984) A critical investigation of factors influencing buildability and productivity. PhD thesis, Heriot-Watt University, UK.
Griffith, A (2011) Delivering best value in the small works portfolio of public sector organizations when using preferred contractors. Construction Management and Economics, 29(9), pp. 891-900. ISSN 1466433X
Grisham, T and Walker, D H T (2006) Nurturing a knowledge environment for international construction organizations through communities of practice. Construction Innovation, 6(4), pp. 217-231. ISSN 1471-4175
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.
Grobler, L J and Singh, V (1999) Research information: The green buildings for Africa programme. Building Research & Information, 27(3), pp. 183-193. ISSN 0961-3218
Grosskopf, K R (2010) Post-disaster recovery and reconstruction safety training. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 322-333. ISSN 1759-5916
Grosskopf, K R and Kibert, C J (2006) Economic incentive framework for sustainable energy use in us residential construction. Construction Management and Economics, 24(8), pp. 839-846. ISSN 1466433X
Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193
Guenther, P (2020) A case study of perceptions of asset tracking and inventory management technology in a small construction company. PhD thesis, Wilmington University (Delaware), USA.
Gugssa, M; Li, L; Pu, L; Gurbuz, A; Luo, Y and Wang, J (2025) Enabling near-real-time safety glove detection through edge computing and transfer learning: comparative analysis of edge and cloud computing-based methods. Engineering, Construction and Architectural Management, 32(7), pp. 4700-4717. ISSN 0969-9988
Gunarathna, C; Yang, R; Wijeratne Mudiyanselage, P; Amarasinghe, G; Samarasinghalage, T; Weerasinghe, R P N; Zhao, H; Zhang, C; Liu, C; Wang, K and Dev Sureshkumar Jayakumari, S (2024) Project-based learning for proactive skills development of postgraduate students in solar energy building design digitalisation. Smart and Sustainable Built Environment, 13(4), pp. 828-855. ISSN 2046-6099
Gunasagaran, S; Mari, T; Mohamed, R; Ng, V and Srirangam, S (2024) Students’ perception of virtual reality applications to analyse daylighting and spatial functions in architecture and environment. Journal of Construction in Developing Countries, 29(2), pp. 147-165. ISSN 1823-6499
Gunay, H B; O'Brien, W; Beausoleil-Morrison, I and Huchuk, B (2014) On adaptive occupant-learning window blind and lighting controls. Building Research & Information, 42(6), pp. 739-756. ISSN 0961-3218
Gunaydin, H M (1999) Impact of information technologies on project management functions. PhD thesis, Illinois Institute of Technology, USA.
Gunduz, M (2002) Change orders impact assessment for labor intensive construction. PhD thesis, University of Wisconsin - Madison, USA.
Gunduz, M and Al-Naimi, N H (2022) Construction projects delay mitigation using integrated balanced scorecard and quality function deployment. Engineering, Construction and Architectural Management, 29(5), pp. 2073-2105. ISSN 0969-9988
Gunning, J G (1997) The costs and benefits of achieving business excellence in construction organisations. Journal of Financial Management of Property and Construction, 2(1), pp. 45-58. ISSN 1366-4387
Gunning, J G and Keaveney, M (1998) A transverse examination of occupational stress among a cross-disciplinary population of Irish construction professionals. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Gunning, J G and Moss, J (2002) Public private partnership procurement of educational facilities in the UK. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Guo, H; Yu, Y; Ding, Q and Skitmore, M (2018) Image-and-skeleton-based parameterized approach to real-time identification of construction workers' unsafe behaviors. Journal of Construction Engineering and Management, 144(6): 04018042, ISSN 0733-9364
Guo, Q; Amin, S; Wang, H and Yan, H (2024) Coupling simulation of human-environmental safety risk factors in metro construction: A case study of Rongjiazhai Station at xi’an Metro Line 5 in China. International Journal of Construction Education and Research, 20(1), pp. 26-42. ISSN 15578771
Guo, Q L (2001) Development of risk analysis models for decision-making in project management. PhD thesis, Edinburgh Napier University, UK.
Guo, S J (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4), pp. 287-295. ISSN 0733-9364
Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.
Gupta, R and Chandiwala, S (2010) Understanding occupants: Feedback techniques for large-scale low-carbon domestic refurbishments. Building Research & Information, 38(5), pp. 530-548. ISSN 0961-3218
Gupta, R and Gregg, M (2012) Appraisal of UK funding frameworks for energy research in housing. Building Research & Information, 40(4), pp. 446-460. ISSN 0961-3218
Gupta, R and Gregg, M (2013) Preventing the overheating of English suburban homes in a warming climate. Building Research & Information, 41(3), pp. 281-300. ISSN 0961-3218
Gupta, R; Gregg, M and Cherian, R (2020) Developing a new framework to bring consistency and flexibility in evaluating actual building performance. International Journal of Building Pathology and Adaptation, 38(1), pp. 228-255. ISSN 23984708
Gupta, R; Gregg, M; Passmore, S and Stevens, G (2015) Intent and outcomes from the retrofit for the future programme: Key lessons. Building Research & Information, 43(4), pp. 435-451. ISSN 0961-3218
Gurgun, A P; Koc, K and Kunkcu, H (2024) Exploring the adoption of technology against delays in construction projects. Engineering, Construction and Architectural Management, 31(3), pp. 1222-1253. ISSN 0969-9988
Gurjao, S (2010) Inclusivity: understanding the careers of women in the construction industry. PhD thesis, University of Reading, UK.
Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029
Gurmu, A T and Ongkowijoyo, C S (2020) Predicting construction labor productivity based on implementation levels of human resource management practices. Journal of Construction Engineering and Management, 146(3): 04019115, ISSN 0733-9364
Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.
Guven, G and Ergen, E (2021) Tracking major resources for automated progress monitoring of construction activities: Masonry work case. Construction Innovation, 21(4), pp. 648-667. ISSN 1471-4175
Guyer, R C and Laman, J A (2012) Short-line railroad management system for bridge prioritization. Built Environment Project and Asset Management, 2(1), pp. 25-40. ISSN 2044-124X
Guzel, Z. T. (2026) Institutionalizing the disaster-space nexus in landscape architecture education: A curriculum analysis across Türkiye. International Journal of Disaster Resilience in the Built Environment, 17(4), pp. 527-550. ISSN 1759-5908
Gwak, H S; Son, S H; Park, Y J and Lee, D E (2016) Exact time-cost tradeoff analysis in concurrency-based scheduling. Journal of Construction Engineering and Management, 142(10): 04016054, ISSN 0733-9364
Gyadu-Asiedu, W; Danso, H and Asubonteng, J A (2013) Assessment of the performance of local and foreign road construction firms in Ghana. International Journal of Construction Management, 13(4), pp. 53-73. ISSN 1562-3599
Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.
Gómez-Cabrera, A; Gutierrez-Bucheli, L and Muñoz, S (2024) Causes of time and cost overruns in construction projects: A scoping review. International Journal of Construction Management, 24(10), pp. 1107-1125. ISSN 1562-3599
Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Unlocking productivity: Revealing waste and hidden disturbances impacting mep workers. Journal of Construction Engineering and Management, 150(9): 04024108, ISSN 0733-9364
Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364
Haas, T C; Rodriguez, A M; Glover, R and Goodrum, P M (2001) Implementing a multiskilled workforce. Construction Management and Economics, 19(6), pp. 633-641. ISSN 01446193
Habib, M and Spang, K (2014) Alternative project delivery systems for transport infrastructure in Germany. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Habib, S N H A (2017) Critical success factors and contractual risks for Private Finance 2 (PF2) projects implementing building information modelling (BIM). PhD thesis, University of Salford, UK.
Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.
Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance. PhD thesis, Nottingham Trent University, UK.
Hadipriono, F C; Lim, C L and Wong, K H (1986) Event tree analysis to prevent failures in temporary structures. Journal of Construction Engineering and Management, 112(4), pp. 500-513. ISSN 0733-9364
Hadjri, K (1992) The viability of 'no-fines' for the production of appropriate housing in Algeria. PhD thesis, CNAA, Oxford Polytechnic, UK.
Hagan, G; Bower, D and Smith, N (2011) Managing complex projects in multi-project environments. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Haidar, A (2011) Analysis and optimization of megaproject performance. PhD thesis, University of Florida, USA.
Hairstans, R (2007) Optimisation of timber platform frame construction. PhD thesis, Edinburgh Napier University, UK.
Hajarolasvadi, H and Shahhosseini, V (2022) A system-dynamic model for evaluating the effect of person-team fit on project performance. Journal of Construction Engineering and Management, 148(11): 04022126, ISSN 0733-9364
Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.
Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hajibabai, L; Aziz, Z and Peña-Mora, F (2011) Visualizing greenhouse gas emissions from construction activities. Construction Innovation, 11(3), pp. 356-370. ISSN 1471-4175
Hajifathalian, K; Wambeke, B W; Liu, M and Hsiang, S M (2012) Effects of production control strategy and duration variance on productivity and work in process: Simulation-based investigation. Journal of Construction Engineering and Management, 138(9), pp. 1035-1043. ISSN 0733-9364
Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175
Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099
Halabya, A and El-Rayes, K (2020) Optimizing the planning of pedestrian facilities upgrade projects to maximize accessibility for people with disabilities. Journal of Construction Engineering and Management, 146(1): 04019088, ISSN 0733-9364
Halder, S; Afsari, K and Akanmu, A (2026) Factors affecting the adoption of a robotic cyber-physical system in construction progress monitoring. Journal of Construction Engineering and Management, 152(3): 04026005, ISSN 0733-9364
Hale, D R; Shrestha, P P; Gibson, G E and Migliaccio, G C (2009) Empirical comparison of design/build and design/bid/build project delivery methods. Journal of Construction Engineering and Management, 135(7), pp. 579-587. ISSN 0733-9364
Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007
Hallowell, M (2010) Cost-effectiveness of construction safety programme elements. Construction Management and Economics, 28(1), pp. 25-34. ISSN 1466433X
Ham, N; Moon, S; Kim, J H and Kim, J J (2018) Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project. Journal of Construction Engineering and Management, 144(6): 05018006, ISSN 0733-9364
Hamerski, D C; Formoso, C T and Isatto, E L (2025) Integrating lean production and agile project management: A planning and control model for multi-project environments in construction. International Journal of Construction Management, 25(12), pp. 1432-1441. ISSN 1562-3599
Hamerski, D C; Tarcisio Abreu, S; Carlos Torres, F and Isatto, E L (2024) The contributions of the last planner system to resilient performance in construction projects. Construction Management and Economics, 42(4), pp. 328-345. ISSN 01446193
Hamiani, A (1987) Consite: A knowledge-based expert system framework for construction site layout. PhD thesis, University of Texas at Austin, USA.
Hamid, Z A and Anuar Mohamad Kamar, K (2012) Aspects of off-site manufacturing application towards sustainable construction in Malaysia. Construction Innovation, 12(1), pp. 4-10. ISSN 1471-4175
Hamide, M (2017) Schedule and cost performance analysis and prediction in Louisiana DOTD. PhD thesis, University of New Orleans, USA.
Hamideh, Z (2013) The under-reporting of injuries for Hispanic workers in construction. PhD thesis, University of Utah, USA.
Hamilton, I G; Shipworth, D; Summerfield, A J; Steadman, P; Oreszczyn, T and Lowe, R (2014) Uptake of energy efficiency interventions in English dwellings. Building Research & Information, 42(3), pp. 255-275. ISSN 0961-3218
Hamilton, I G; Summerfield, A J; Lowe, R; Ruyssevelt, P; Elwell, C A and Oreszczyn, T (2013) Energy epidemiology: A new approach to end-use energy demand research. Building Research & Information, 41(4), pp. 482-497. ISSN 0961-3218
Hammad, A W; Grzybowska, H; Sutrisna, M; Akbarnezhad, A and Haddad, A (2020) A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Construction Management and Economics, 38(6), pp. 534-551. ISSN 01446193
Hammad, M W; Abbasi, A and Ryan, M J (2018) Developing a novel framework to manage schedule contingency using theory of constraints and earned schedule method. Journal of Construction Engineering and Management, 144(4): 04018011, ISSN 0733-9364
Hammad, Mohammed (2018) Estimating, allocating and managing schedule and cost contingency in construction projects. PhD thesis, University of New South Wales, Australia.
Hamour, O A A R (1978) Project selection and planning in developing countries. PhD thesis, Swansea University, UK.
Hampton, G; Baldwin, A N and Holt, G D (2012) Project delays and cost: Stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), pp. 73-91. ISSN 1366-4387
Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.
Hamzeh, F R; El Samad, G and Emdanat, S (2019) Advanced metrics for construction planning. Journal of Construction Engineering and Management, 145(11): 04019063, ISSN 0733-9364
Hamzeh, F R; Faek, F and AlHussein, H (2019) Understanding improvisation in construction through antecedents, behaviours and consequences. Construction Management and Economics, 37(2), pp. 61-71. ISSN 01446193
Hamzeh, F R; Zankoul, E and Rouhana, C (2015) How can 'tasks made ready' during lookahead planning impact reliable workflow and project duration? Construction Management and Economics, 33(4), pp. 243-258. ISSN 01446193
Han, T; Zhou, G; Xie, Y; Qiao, F; Feng, J; Liu, P and Wang, S (2026) Time-cost trade-off optimization in ultralong tunnel construction based on working face planning. Journal of Construction Engineering and Management, 152(3): 04026007, ISSN 0733-9364
Han, Bing (2022) Implementing virtual reality-based design review in the construction industry. PhD thesis, University of Texas at Austin, USA.
Han, J; Chen, C; Tiong, R L K; Wu, K and Chew, D K H (2024) Strategic workforce planning for production of prefabricated bathroom units: An advanced markovian approach. Journal of Construction Engineering and Management, 150(8): 04024097, ISSN 0733-9364
Han, K; Degol, J and Golparvar-Fard, M (2018) Geometry- and appearance-based reasoning of construction progress monitoring. Journal of Construction Engineering and Management, 144(2): 04017110, ISSN 0733-9364
Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364
Han, S S and Ofori, G (2001) Construction industry in China's regional economy, 1990-1998. Construction Management and Economics, 19(2), pp. 189-205. ISSN 01446193
Han, Sang Hyeok (2014) BIM-based motion planning of mobile crane operation in modular-based heavy construction sites. PhD thesis, University of Alberta, Canada.
Han, W; Xu, L; Mouri, M M; Loh, W Y; Dai, F and Zhu, Z (2025) Drone flights and worker visual attention: A quantitative study of distraction and hazard awareness. Journal of Construction Engineering and Management, 151(11): 04025173, ISSN 0733-9364
Han, Y; Yin, Z; Zhang, J; Jin, R and Yang, T (2020) Eye-tracking experimental study investigating the influence factors of construction safety hazard recognition. Journal of Construction Engineering and Management, 146(8): 04020091, ISSN 0733-9364
Handa, V K and Barcia, R M (1986) Linear scheduling using optimal control theory. Journal of Construction Engineering and Management, 112(3), pp. 387-393. ISSN 0733-9364
Handa, V K and Rivers, D (1983) Downgrading construction incidents. Journal of Construction Engineering and Management, 109(2), pp. 190-205. ISSN 0733-9364
Hanif, H; Khurshid, M B; Lindhard, S M and Aslam, Z (2016) Impact of variation orders on time and cost in mega hydropower projects of Pakistan. Journal of Construction in Developing Countries, 21(2), pp. 37-53. ISSN 1823-6499
Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions. PhD thesis, Illinois Institute of Technology, USA.
Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364
Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364
Hanna, A S; Chang, C K; Lackney, J A and Sullivan, K T (2007) Impact of overmanning on mechanical and sheet metal labor productivity. Journal of Construction Engineering and Management, 133(1), pp. 22-28. ISSN 0733-9364
Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364
Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364
Hanna, A S; Peterson, P and Lee, M J (2002) Benchmarking productivity indicators for electrical/mechanical projects. Journal of Construction Engineering and Management, 128(4), pp. 331-337. ISSN 0733-9364
Hanna, A S and Skiffington, M A (2010) Effect of preconstruction planning effort on sheet metal project performance. Journal of Construction Engineering and Management, 136(2), pp. 235-241. ISSN 0733-9364
Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364
Hao, J L J (2002) Better use of information: A simulation model for international construction joint ventures in China. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Harding, A M (1999) A global approach to project optimisation. PhD thesis, University of Edinburgh, UK.
Hare, B and Cameron, I (2011) Site manager safety training. Engineering, Construction and Architectural Management, 18(6), pp. 568-578. ISSN 0969-9988
Hariga, M and El-Sayegh, S M (2011) Cost optimization model for the multiresource leveling problem with allowed activity splitting. Journal of Construction Engineering and Management, 137(1), pp. 56-64. ISSN 0733-9364
Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control. PhD thesis, Iowa State University, USA.
Harmelink, D J (2001) Linear scheduling model: Float characteristics. Journal of Construction Engineering and Management, 127(4), pp. 255-260. ISSN 0733-9364
Harmelink, D J and Rowings, J E (1998) Linear scheduling model: Development of controlling activity path. Journal of Construction Engineering and Management, 124(4), pp. 263-268. ISSN 0733-9364
Haroglu, H (2010) Investigating the structural frame decision making process. EngD thesis, Loughborough University, UK.
Haroglu, H; Glass, J and Thorpe, T (2009) A study of professional perspectives on structural frame selection. Construction Management and Economics, 27(12), pp. 1209-1217. ISSN 1466433X
Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364
Harran, M and Theunissen, H W (2019) Navigating the engineering literacy divide: design report collaboration practice realities. Journal of Engineering, Design and Technology, 17(1), pp. 77-101. ISSN 1726-0531
Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.
Harris, P T and Holt, G D (1999) The management of sustainable social housing refurbishment strategies in the West Midlands region of the UK. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Harris, R A; Bowlby, W and Cohn, L F (1987) Method for analyzing construction haul noise impacts. Journal of Construction Engineering and Management, 113(1), pp. 6-16. ISSN 0733-9364
Harris, R A and Scott, S (2001) UK practice in dealing with claims for delay. Engineering, Construction and Architectural Management, 8(5-6), pp. 317-324. ISSN 0969-9988
Harris, R B (1990) Packing method for resource leveling (PACK). Journal of Construction Engineering and Management, 116(2), pp. 331-350. ISSN 0733-9364
Harris, R B and Ioannou, P G (1998) Scheduling projects with repeating activities. Journal of Construction Engineering and Management, 124(4), pp. 269-278. ISSN 0733-9364
Hartmann, A D A M L (2008) A role-play approach for teaching research methodology in construction management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Hartmann, T and Fischer, M (2007) Supporting the constructability review with 3D/4D models. Building Research & Information, 35(1), pp. 70-80. ISSN 0961-3218
Harty, C; Themsen, T N and Tryggestad, K (2014) Risk management and uncertainty in infrastructure projects: What role(s) for knowledge and construction management? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Harty, C; Tryggestad, K and Jacobsen, P H (2015) Visualisations and calculations of spaces: Negotiating hospital design during on-boarding. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Harty, J (2012) The impact of digitalisation on the management role of architectural technology. PhD thesis, Robert Gordon University, UK.
Harun, A N (2015) The application of mobile web and devices for environmental surveillance on construction sites in Malaysia. PhD thesis, University of Salford, UK.
Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988
Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364
Hasan, M and Lu, M (2024) Mitigating project schedule risks by identifying subcritical paths and variance-critical activities. Journal of Construction Engineering and Management, 150(8): 04024096, ISSN 0733-9364
Hasan, S and Sacks, R (2023) Integrating BIM and multiple construction monitoring technologies for acquisition of project status information. Journal of Construction Engineering and Management, 149(7): 04023051, ISSN 0733-9364
Hasanzadeh, S; Esmaeili, B and Dodd, M D (2017) Impact of construction workers' hazard identification skills on their visual attention. Journal of Construction Engineering and Management, 143(10): 04017070, ISSN 0733-9364
Hashemi, R and Shahbandarzadeh, H (2024) A fuzzy goal programming model for time, cost, and quality trade-off problem in metro construction projects considering sustainable development. International Journal of Construction Management, 24(3), pp. 323-330. ISSN 1562-3599
Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(6), pp. 515-533. ISSN 01446193
Hassan, A; El-Rayes, K and Attalla, M (2021) Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 28(6), pp. 1615-1634. ISSN 0969-9988
Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599
Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175
Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364
Hassan, Z (1997) CONPLAN: Construction planning and buildability evaluation in an integrated and intelligent construction environment. PhD thesis, University of Salford, UK.
Hassanein, A (2003) Planning and scheduling highway construction using GIS and dynamic programming. PhD thesis, Concordia University, Canada.
Hassanein, A and Moselhi, O (2004) Planning and scheduling highway construction. Journal of Construction Engineering and Management, 130(5), pp. 638-646. ISSN 0733-9364
Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193
Hassanein, A A G and Melin, J W (1996) Time constraints set by prime contractors for their sub-contractors. Building Research & Information, 24(5), pp. 293-301. ISSN 0961-3218
Hassler, U and Kohler, N (2014) The ideal of resilient systems and questions of continuity. Building Research & Information, 42(2), pp. 158-167. ISSN 0961-3218
Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2007) Project manager's decision aid for a radical project cycle reduction. Journal of Construction Engineering and Management, 133(6), pp. 437-446. ISSN 0733-9364
Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2008) Analysis of techniques leading to radical reduction in project cycle time. Journal of Construction Engineering and Management, 134(12), pp. 915-927. ISSN 0733-9364
Hatem, W A H (2012) Comparing the effectiveness of face to face and computer mediated collaboration in design. PhD thesis, Cardiff University, UK.
Hatipkarasulu, Y (2020) A conceptual approach to graphically compare construction schedules. Construction Innovation, 20(1), pp. 43-60. ISSN 1471-4175
Hatmoko, J U D (2008) The impact of supply chain management practice on construction project performance. PhD thesis, University of Newcastle upon Tyne, UK.
Hatmoko, J U D and Scott, S (2010) Simulating the impact of supply chain management practice on the performance of medium-sized building projects. Construction Management and Economics, 28(1), pp. 35-49. ISSN 1466433X
Hatush, Z; Saleh, S and Shiki, A (2005) Effect of critical delay factors on cost: Overrun during the design stage. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Hauer, M (2012) A game-based learning approach to building conservation education in UK undergraduate built environment degrees. PhD thesis, University of Portsmouth, UK.
Hauptfleisch, A C and Verster, J J P (2007) Mentoring: A key intervention in small construction contractor capacity building in South Africa. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Hayden, I (2019) An evaluation of the design and use of applied visual interactive resources for teaching building regulations in higher education built environment programmes. Architectural Engineering and Design Management, 15(3), pp. 159-180. ISSN 1745-2007
Hayes, J; McDermott, V and Lingard, H (2015) What is risk? Construction activity near hazardous infrastructure. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Hayne, G; Kumar, B and Hare, B (2017) Design hazard identification and the link to site experience. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 85-94. ISSN 17514304
He, S; Li, J; Li, M and Antwi-Afari, M F (2026) Modeling and analyzing workers' hazard perception in construction equipment operations: A hierarchical Bayesian cognitive modeling approach integrating multisource data. Journal of Construction Engineering and Management, 152(5): 04026054, ISSN 0733-9364
He, C (2022) Integrate human and engineering aspects to facilitate construction scheduling under uncertainty. PhD thesis, North Carolina State University, USA.
He, C; Liu, M; Alves, T D C L; Scala, N M and Hsiang, S M (2022) Prioritizing collaborative scheduling practices based on their impact on project performance. Construction Management and Economics, 40(7-8), pp. 618-637. ISSN 01446193
He, W; Shi, Y and Kong, D (2019) Construction of a 5D duration and cost optimisation model based on genetic algorithm and BIM. Journal of Engineering, Design and Technology, 17(5), pp. 929-942. ISSN 1726-0531
Healy, J; Ryan, W; Stewart, S and Stewart, R (2002) Training needs analysis in an SME in the Irish construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Heard, I; Love, P E D; Sing, M C P and Goerke, V (2017) Learning to build relationships for a better Australia: Indigenous reconciliation in action in the construction and resource sectors. Construction Innovation, 17(1), pp. 4-24. ISSN 1471-4175
Heaton, R; Martin, H; Chadee, A; Milling, A; Dunne, S and Borthwick, F (2022) The construction materials conundrum: Practical solutions to address integrated supply chain complexities. Journal of Construction Engineering and Management, 148(8): 04022071, ISSN 0733-9364
Hedborg, S (2022) ”It’s in the between”: Inter-project organising in project ecologies. PhD thesis, KTH Royal Institute of Technology, Sweden.
Heesom, D (2004) An analytical system for space planning on construction sites. PhD thesis, University of Wolverhampton, UK.
Heesom, D; Boden, P; Hatfield, A; Rooble, S; Andrews, K and Berwari, H (2021) Developing a collaborative HBIM to integrate tangible and intangible cultural heritage. International Journal of Building Pathology and Adaptation, 39(1), pp. 72-95. ISSN 23984708
Hegab, M and Smith, G R (2009) Labor performance analysis for microtunneling projects. Journal of Construction Engineering and Management, 135(5), pp. 432-435. ISSN 0733-9364
Hegab, M Y and Smith, G R (2007) Delay time analysis in microtunneling projects. Journal of Construction Engineering and Management, 133(2), pp. 191-195. ISSN 0733-9364
Hegazy, T (1999) Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), pp. 167-175. ISSN 0733-9364
Hegazy, T (2006) Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132(1), pp. 26-34. ISSN 0733-9364
Hegazy, T; Abdel-Monem, M and Saad, D A (2014) Framework for enhanced progress tracking and control of linear projects. Engineering, Construction and Architectural Management, 21(1), pp. 94-110. ISSN 0969-9988
Hegazy, T; Abdel-Monem, M; Saad, D A and Rashedi, R (2013) Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139(9), pp. 1135-1143. ISSN 0733-9364
Hegazy, T; Elbeltagi, E and Zhang, K (2005) Keeping better site records using intelligent bar charts. Journal of Construction Engineering and Management, 131(5), pp. 513-521. ISSN 0733-9364
Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364
Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364
Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364
Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364
Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364
Hegazy, T and Menesi, W (2010) Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136(10), pp. 1078-1085. ISSN 0733-9364
Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364
Hegazy, T and Petzold, K (2003) Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129(4), pp. 396-404. ISSN 0733-9364
Hegazy, T; Saad, D A and Mostafa, K (2020) Enhanced repetitive-scheduling computation and visualization. Journal of Construction Engineering and Management, 146(10): 04020118, ISSN 0733-9364
Hegazy, T; Shabeeb, A K; Elbeltagi, E and Cheema, T (2000) Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126(6), pp. 414-421. ISSN 0733-9364
Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364
Hegazy, T and Zhang, K (2005) Daily windows delay analysis. Journal of Construction Engineering and Management, 131(5), pp. 505-512. ISSN 0733-9364
Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.
Heineck, L F (1983) On the analyses of activity durations on three house building sites. PhD thesis, University of Leeds, UK.
Hejducki, Z and Mrozowicz, J (2001) Stream methods of construction work organization: An introduction to the problem. Engineering, Construction and Architectural Management, 8(2), pp. 80-89. ISSN 0969-9988
Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364
Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364
Hendrickson, C; Martinelli, D and Rehak, D (1987) Hierarchical rule-based activity duration estimation. Journal of Construction Engineering and Management, 113(2), pp. 288-301. ISSN 0733-9364
Hendrickson, Thomas Peter (2013) Carbon and water resource management for water distribution systems. PhD thesis, University of California, USA.
Hendy, A O A (2007) An approach to sustainable construction in post-disaster contexts: with specific reference to the Marmara region of Turkey. PhD thesis, Coventry University, UK.
Henneberry, J and Rowley, S (2002) Property market processes and development outcomes in cities and regions. Journal of Financial Management of Property and Construction, 7(1), pp. 3-15. ISSN 1366-4387
Henry Duncan John, M; Amoah, C and Ayesu-Koranteng, E (2022) Causes of road projects' delays: A case of blantyre, Malawi. Built Environment Project and Asset Management, 12(2), pp. 293-308. ISSN 2044-124X
Heravi, G; Kebria, M F and Rostami, M (2021) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(1), pp. 174-195. ISSN 0969-9988
Heravi, G and Mohammadian, M (2021) Investigating cost overruns and delay in urban construction projects in Iran. International Journal of Construction Management, 21(9), pp. 958-968. ISSN 1562-3599
Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X
Heravi Torbati, Amir Hossein (2014) Improving construction management: An investigation into the influences of effective stakeholder involvement on project quality outcomes. PhD thesis, Queensland University of Technology, Australia.
Herbsman, Z (1986) SERC: A model for estimating construction inputs. Journal of Construction Engineering and Management, 112(3), pp. 425-439. ISSN 0733-9364
Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193
Herbsman, Z J (1995) A+B bidding method: hidden success story for highway construction. Journal of Construction Engineering and Management, 121(4), pp. 430-437. ISSN 0733-9364
Herbsman, Z J; Chen, W T and Epstein, W C (1995) Time is money: Innovative contracting methods in highway construction. Journal of Construction Engineering and Management, 121(3), pp. 273-281. ISSN 0733-9364
Heredia-Rojas, B; Liu, L and Taborda, L (2015) Relational approach of value creation for construction project delivery: A conceptual framework. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Heshmati, K; Shahabpoor, E; Walker, I; Ghanbari, S and Darby, A (2025) The effect of wind-induced vibrations in tall buildings on occupants' work performance. Building Research & Information, 53(8), pp. 949-964. ISSN 0961-3218
Heydari, M; Heravi, G; Raeisinafchi, R and Karimi, H (2024) A dynamic model to assess the role of site supervision systems in the safety performance of construction projects. Journal of Construction Engineering and Management, 150(3): 04024001, ISSN 0733-9364
Hide, G (2010) Managing a programme under the NEC3 ECC contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 111-119. ISSN 17514312
Hide, G (2010) Producing a programme under the NEC form of contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(2), pp. 59-64. ISSN 17514312
Hiete, M; Merz, M and Schultmann, F (2011) Scenario-based impact analysis of a power outage on healthcare facilities in Germany. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 222-244. ISSN 1759-5916
Higham, A and Fortune, C (2010) The early stage benefit planning of housing rengeneration projects: The gap between theory and practice. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Higham, A and Fortune, C (2011) Sustainable asset management (SAM) decision making: An exploration of current practice. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Higham, A and Fortune, C J (2012) Investment appraisal tools and sustainability evaluation in social housing. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Higham, A P (2014) Conceptual framework for the sustainable benefit evaluation of UK social housing projects. PhD thesis, Sheffield Hallam University, UK.
Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.
Hildreth, J; Vorster, M and Martinez, J (2005) Reduction of short-interval GPS data for construction operations analysis. Journal of Construction Engineering and Management, 131(8), pp. 920-927. ISSN 0733-9364
Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(2), pp. 139-151. ISSN 1557-8771
Hill, C (2000) Professionally accredited industrial experience: A proposal. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hill, C (2001) Work based learning for construction management courses. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Hill, C and Rodgers, J (2000) Project partnering arrangement for delivery of a tight scheduled project. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hillebrandt, P M and Meikle, J L (1985) Resource planning for construction. Construction Management and Economics, 3(3), pp. 249-263. ISSN 01446193
Hindle, R D and Muller, M H (1997) The role of education as an agent of change: a two-fold effect. Journal of Construction Procurement, 3(1), pp. 56-69. ISSN 1358-9180
Hindman, D P; Bamberg, C R and Nussbaum, M A (2014) Bracing of wood composite I-joists to resist lateral buckling from walking loads. Journal of Construction Engineering and Management, 140(9): 04014037, ISSN 0733-9364
Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.
Hinze, J and Raboud, P (1988) Safety on large building construction projects. Journal of Construction Engineering and Management, 114(2), pp. 286-293. ISSN 0733-9364
Hitt, S J; Hairstans, R; Oloke, D; Bertasso, S; Tamagnone, G and Shirley, B (2024) Developing modern construction professionals with a focus on timber – a UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 32-40. ISSN 17514304
Hiyassat, M A; Alkasagi, F; El-Mashaleh, M and Sweis, G J (2022) Risk allocation in public construction projects: The case of Jordan. International Journal of Construction Management, 22(8), pp. 1478-1488. ISSN 1562-3599
Hiyassat, M A S (2000) Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4), pp. 278-284. ISSN 0733-9364
Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains. PhD thesis, University of Washington, USA.
Ho, P (2012) Comparison of the grey model and the box jenkins model in forecasting manpower in the UK construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Hochstatter, Kirk (2025) Collaborative project delivery governance and shared leadership in AEC building virtual teams. PhD thesis, University of Washington, USA.
Hofman, P; Wade, F; Webb, J and Groenleer, M (2021) Retrofitting at scale: Comparing transition experiments in Scotland and the Netherlands. Buildings & Cities, 2(1), pp. 637-654. ISSN 2632-6655
Hollister, K C (1992) An extended structured query language incorporating object data types for the construction industry. PhD thesis, University of Florida, USA.
Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.
Holt, L (1983) A case study of the construction of a terephthalic acid plant for Imperial Chemicals Limited at the Davies Works, Wilton, Cleveland, UK. Construction Management and Economics, 1(1), pp. 57-74. ISSN 01446193
Holton, I R (2009) Developing a sector sustainability strategy for the UK precast concrete industry. EngD thesis, Loughborough University, UK.
Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364
Hong, X (2002) A comparative study of contractor performance based on Japanese, UK and US construction practice. PhD thesis, University of Wolverhampton, UK.
Hong, Y; Xie, H; Agapaki, E and Brilakis, I (2023) Graph-based automated construction scheduling without the use of BIM. Journal of Construction Engineering and Management, 149(2): 05022020, ISSN 0733-9364
Hong-minh, S M T (2002) Re-engineering the UK private house building supply chain. PhD thesis, University of Wales College of Cardiff, UK.
Hooper, M (2015) BIM anatomy II: Standardisation needs & support systems. PhD thesis, Lund University, Sweden.
Hooper, M (2015) Automated model progression scheduling using level of development. Construction Innovation, 15(4), pp. 428-448. ISSN 1471-4175
Hooshangi, N; Mahdizadeh Gharakhanlou, N and Ghaffari-Razin, S R (2024) Urban search and rescue (USAR) simulation in earthquake environments using queuing theory: estimating the appropriate number of rescue teams. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 1-18. ISSN 1759-5916
Hopkin, D J (2011) The fire performance of engineered timber products and systems. EngD thesis, Loughborough University, UK.
Hopkin, T; Lu, S L; Rogers, P and Sexton, M G (2014) Placing defects at the heart of high quality new homes: The learning perspective. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Hoque, M I; Safayet, M A; Rana, M J; Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(2), pp. 401-421. ISSN 23984708
Horii, T (2005) Impact of multiple normative systems on the organizational performance of international joint ventures. PhD thesis, Stanford University, USA.
Horman, Michael J (2000) Process dynamics: Buffer management in building project operations. PhD thesis, University of Melbourne, Australia.
Hornaday, W C; Haas, C T; O’Connor, J T and Wen, J (1993) Computer-aided planning for heavy lifts. Journal of Construction Engineering and Management, 119(3), pp. 498-515. ISSN 0733-9364
Horne, R; Maller, C and Dalton, T (2014) Low carbon, water-efficient house retrofits: An emergent niche? Building Research & Information, 42(4), pp. 539-548. ISSN 0961-3218
Horner, M and Zakieh, R (1996) Characteristic items: a new approach to pricing and controlling construction projects. Construction Management and Economics, 14(3), pp. 241-252. ISSN 01446193
Horney, J; Simon, M C; Ricchetti-Masterson, K and Berke, P (2016) Resident perception of disaster recovery planning priorities. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 330-343. ISSN 1759-5916
Horsthuis, C (2016) The importance of organisational slack as an unexplored determinant of firm level innovation and performance in the construction context. PhD thesis, Loughborough University, UK.
Horsthuis, C; Thomson, D S and Fernie, S (2012) The case for slack to promote innovative behaviour in construction firms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Hosny, F.; El-Damaty, M.; Mantha, B. R. K. and Abu Dabous, S. (2026) Analysis and modeling of delays during construction handover stage for building projects: A case study of United Arab Emirates. International Journal of Building Pathology and Adaptation, 44(3), pp. 658-684. ISSN 2398-4708
Hosny, O A (1991) An intelligent decision support system for construction planning and scheduling. PhD thesis, University of Missouri - Rolla, USA.
Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction. PhD thesis, University of Calgary, Canada.
Hossain, M A; Raiymbekov, D; Nadeem, A and Kim, J R (2022) Delay causes in Kazakhstan's construction projects and remedial measures. International Journal of Construction Management, 22(5), pp. 801-819. ISSN 1562-3599
Hossain, M K (2015) Investigating the relationship between the culture of construction project-based organisations and the implementation of building information modelling. PhD thesis, University of Dundee, UK.
Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.
Hosseinian, A H and Baradaran, V (2023) A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: A case study in construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 321-363. ISSN 0969-9988
Hosseinian, S M (2016) An optimal time incentive/disincentive -based compensation in contracts with multiple agents. Construction Economics and Building, 16(4), pp. 35-53. ISSN 2204-9029
Hosseinian, Seyedmahdi (2013) Optimal outcome sharing arrangements in construction target contracts. PhD thesis, University of New South Wales, Australia.
Hou, W and Ran, W (2025) Unveiling the effects of influencing factors on PPP project capital structure in China using machine learning. Engineering, Construction and Architectural Management, 32(12), pp. 8621-8641. ISSN 0969-9988
Hou, Shan (2014) An investigation into the development of low/zero carbon design training programmes for the purpose of disseminating the knowledge and skills of low/zero carbon design to architects in practice in England and Wales. PhD thesis, Cardiff University, UK.
Hou, X; Zeng, Y and Xue, J (2020) Detecting structural components of building engineering based on deep-learning method. Journal of Construction Engineering and Management, 146(2): 04019097, ISSN 0733-9364
Householder, J L and Rutland, H E (1990) Who owns float? Journal of Construction Engineering and Management, 116(1), pp. 130-133. ISSN 0733-9364
Howell, G A; Ballard, G and Tommelein, I (2011) Construction engineering-reinvigorating the discipline. Journal of Construction Engineering and Management, 137, pp. 740-744. ISSN 0733-9364
Howes, R (2000) Improving the performance of earned value analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(4), pp. 399-411. ISSN 0969-9988
Hsu, P Y; Aurisicchio, M; Angeloudis, P and Whyte, J (2020) Understanding and visualizing schedule deviations in construction projects using fault tree analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2501-2522. ISSN 0969-9988
Hu, C and Liu, D (2018) Improved critical path method with trapezoidal fuzzy activity durations. Journal of Construction Engineering and Management, 144(9): 04018090, ISSN 0733-9364
Hu, D and Mohamed, Y (2014) Simulation-model-structuring methodology for industrial construction fabrication shops. Journal of Construction Engineering and Management, 140(5): 04014002, ISSN 0733-9364
Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193
Hu, F; Liao, R and Chen, J (2023) Calculation methods to optimize the number of pedestals and evaluate production plans for precast yards fabricating prestressed bridge beams and precast segments for poststressed segmental erection. Journal of Construction Engineering and Management, 149(1): 04022146, ISSN 0733-9364
Hu, W and Panthi, K (2020) Project status reporting system (PSRS) for pipeline relocation programs. Built Environment Project and Asset Management, 10(5), pp. 693-708. ISSN 2044-124X
Hu, X and Liu, C (2017) Slacks-based data envelopment analysis for eco-efficiency assessment in the Australian construction industry. Construction Management and Economics, 35(11-12), pp. 693-706. ISSN 01446193
Hu, Xiancun (2015) Construction industry performance measurement with carbon reduction. PhD thesis, Deakin University, Australia.
Huang, J; Ji, A; Xiao, Z and Zhang, L (2025) Schedule-cost optimization in high-rise buildings considering uncertainty. Engineering, Construction and Architectural Management, 32(9), pp. 5657-5681. ISSN 0969-9988
Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.
Huang, R Y and Halpin, D W (2000) Graphically based lp modelling for linear scheduling analysis: The polo system. Engineering, Construction and Architectural Management, 7(1), pp. 41-51. ISSN 0969-9988
Huang, R Y and Sun, K S (2006) Non-unit-based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6), pp. 585-597. ISSN 0733-9364
Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175
Huang, Y C (2006) Graphical-based multistage scheduling method for RC buildings. Construction Management and Economics, 24(1), pp. 5-18. ISSN 01446193
Hubbard, B and Hubbard, S (2023) Utilization of uas data by transportation agencies: Building on the experience of construction contractors. International Journal of Construction Management, 23(4), pp. 679-685. ISSN 1562-3599
Hudak, D and Maxwell, M (2007) A macro approach to estimating correlated random variables in engineering production projects. Construction Management and Economics, 25(8), pp. 883-892. ISSN 1466433X
Huebner, G M; Watson, N E; Direk, K; McKenna, E; Webborn, E; Hollick, F; Elam, S and Oreszczyn, T (2021) Survey study on energy use in UK homes during COVID-19. Buildings & Cities, 2(1), pp. 952-969. ISSN 2632-6655
Hughes, M L (2020) Evaluating the impact of knowledge transfer on project delays for construction project delivery: A qualitative case study. PhD thesis, Northcentral University, USA.
Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.
Hulathdoowage, N D and Hadiwattage, C (2022) Applicability of drywall technologies for disaster-induced housing reconstruction. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 498-515. ISSN 1759-5916
Hulathdoowage, N D; Karunasena, G; Udawatta, N and Liu, C (2024) Essential parameters in stepwise retrofitting for long-term emission reduction in residential buildings. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Hulls, P M (2022) The epidemiology of health and wellbeing in the workplace: managing and measuring occupational stress and behavioural factors in a male-dominated industry. PhD thesis, University of Bristol, UK.
Hummer, J E; Arocho, I and Rasdorf, W (2017) Approach to assessing tradeoffs between construction equipment fleet emissions and cost. Journal of Construction Engineering and Management, 143(5): 04016122, ISSN 0733-9364
Hunter, K and Kelly, J (2004) Value management workshops and partnering conundrums. Journal of Construction Procurement, 10(1),
Huong, H T L and Dzung, L H (2020) Criteria for flood warning levels in Vietnam. International Journal of Disaster Resilience in the Built Environment, 11(5), pp. 645-658. ISSN 1759-5916
Hurtado, K (2018) An andragogically-centered schema for a heuristic approach to post-collegiate development in the built environment. PhD thesis, Arizona State University, USA.
Hussain, M B (1993) Constraint-based construction project scheduling. PhD thesis, Carnegie Mellon University, USA.
Hussain, R S (2017) Investigating the business process implications of managing road works and street works. PhD thesis, Loughborough University, UK.
Hussein, M; Darko, A; Eltoukhy, A E E and Zayed, T (2022) Sustainable logistics planning in modular integrated construction using multimethod simulation and taguchi approach. Journal of Construction Engineering and Management, 148(6): 04022022, ISSN 0733-9364
Hussein, M K; Yusof, M J M and Jaafar, N S (2020) An observational study on forest landscape conservation in Malaysia via the establishment of forestry educational centres. Journal of Construction in Developing Countries, 25(2), pp. 153-173. ISSN 1823-6499
Hutchings, D M and Christofferson, J P (2004) Management practices of residential construction companies producing 25 or fewer units annually. International Journal of Construction Education and Research, 1(1), pp. 34-44. ISSN 1557-8771
Huynh, H T (2021) Game theory applications in construction project management. PhD thesis, Catholic University of America, USA.
Huynh, H T; Lucko, G and Eid, M S (2023) Game theory approach for concurrent delay analysis. Journal of Construction Engineering and Management, 149(3): 04023002, ISSN 0733-9364
Hwang, B G and Lim, E S J (2013) Critical success factors for key project players and objectives: Case study of Singapore. Journal of Construction Engineering and Management, 139(2), pp. 204-215. ISSN 0733-9364
Hwang, B G; Thomas, S R; Haas, C T and Caldas, C H (2009) Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), pp. 187-198. ISSN 0733-9364
Hwang, B G and Yang, S (2014) Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(2), pp. 190-205. ISSN 0969-9988
Hwang, B G and Zhao, X (2015) Review of global performance measurement and benchmarking initiatives. International Journal of Construction Management, 15(4), pp. 265-275. ISSN 1562-3599
Hwang, B G; Zhao, X and Yang, K W (2019) Effect of BIM on rework in construction projects in Singapore: Status quo, magnitude, impact, and strategies. Journal of Construction Engineering and Management, 145(2): 04018125, ISSN 0733-9364
Hwang, B-G; Zhao, X and Tan, L L G (2015) Green building projects: Schedule performance, influential factors and solutions. Engineering, Construction and Architectural Management, 22(3), pp. 327-346. ISSN 0969-9988
Hwang, S; Park, M; Lee, H S and Lee, S (2016) Hybrid simulation framework for immediate facility restoration planning after a catastrophic disaster. Journal of Construction Engineering and Management, 142(8): 4016026, ISSN 0733-9364
Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X
Hyari, K H; Shatarat, N and Khalafallah, A (2017) Handling risks of quantity variations in unit-price contracts. Journal of Construction Engineering and Management, 143(10): 04017079, ISSN 0733-9364
Hymes, S J (2010) Front end specifications and the propagation of construction claims. DSc thesis, Washington University in St. Louis, USA.
Hymes, S J (2011) Front-end specifications and construction claims. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 139-146. ISSN 17514312
Hyun, C; Cho, K; Koo, K; Hong, T and Moon, H (2008) Effect of delivery methods on design performance in multifamily housing projects. Journal of Construction Engineering and Management, 134(7), pp. 468-482. ISSN 0733-9364
Håkansson, H; Jacobsson, M and Linderoth, H (2021) The role of key actors in the emergence of a strategic innovation programme: A translation process perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Hübner, F; Volk, R; Kühlen, A and Schultmann, F (2017) Review of project planning methods for deconstruction projects of buildings. Built Environment Project and Asset Management, 7(2), pp. 212-226. ISSN 2044-124X
Ibbotson, K and Farrell, P (2019) The challenges of prioritising low carbon in public sector flood and coastal erosion risk management (FCERM) construction. International Journal of Building Pathology and Adaptation, 37(5), pp. 615-628. ISSN 23984708
Ibbs, C W (1985) Product specification practices and problems. Journal of Construction Engineering and Management, 111(2), pp. 157-172. ISSN 0733-9364
Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364
Ibbs, W and Nguyen, L D (2007) Alternative for quantifying field-overhead damages. Journal of Construction Engineering and Management, 133(10), pp. 736-742. ISSN 0733-9364
Ibbs, W and Nguyen, L D (2007) Schedule analysis under the effect of resource allocation. Journal of Construction Engineering and Management, 133(2), pp. 131-138. ISSN 0733-9364
Ibironke, O T; Oladinrin, T O; Adeniyi, O and Eboreime, I V (2013) Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria. Journal of Construction in Developing Countries, 18(1), pp. 53-72. ISSN 1823-6499
Ibn Majdoub Hassani, Z; El Barkany, A; Jabri, A; El Abbassi, I and Darcherif, A M (2020) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology, 18(1), pp. 172-189. ISSN 1726-0531
Ibrahim, K; Adebowale, O J; Dodo, M; Zailani, B M; Lukman, O and Kajimo-Shakantu, K (2024) Challenges and coping strategies of built environment students during students industrial work experience scheme (siwes): Perspective from Nigeria. International Journal of Construction Education and Research, 20(2), pp. 157-176. ISSN 15578771
Ibrahim, K; Oshodi, O S; Osuizugbo, I C; Owusu, E K; Ibrahim, A and Shakantu, K K (2024) The usage of social media for learning and teaching in the built environment: A perspective from students. International Journal of Construction Management, 24(8), pp. 902-910. ISSN 1562-3599
Ibrahim, M (2016) Analyzing decision making in alternative contracting for highway pavement rehabilitation projects. PhD thesis, Florida International University, USA.
Ibrahim, M N (2022) Risk management in construction of megahousing projects in Egypt. PhD thesis, London South Bank University, UK.
Ibrahim, M W; Hanna, A S; Russell, J S; Abotaleb, I S and El-Adaway, I H (2020) Quantitative analysis of the impacts of out-of-sequence work on project performance. Journal of Construction Engineering and Management, 146(8): 04020090, ISSN 0733-9364
Ibrahim, Y M (2008) Developing a model for vision-based progress measurement and visualisation of as-built construction operations. PhD thesis, Heriot-Watt University, UK.
Ibrahim Khil, Mohammad Hashim (2025) Automated construction progress monitoring of buildings through mobile mapping and as-built modeling. PhD thesis, University of New South Wales, Australia.
Idoro, G (2012) Comparing levels of use of project plans and performance of traditional contract and design-build construction projects in Nigeria. Journal of Engineering, Design and Technology, 10(1), pp. 7-33. ISSN 1726-0531
Idoro, G I (2012) The influence of project documents on the outcome of construction projects procured by traditional contracts in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 1-19. ISSN 1823-6499
Idoro, G I and Okun, B O (2009) Evaluating the contribution of project team members to time-overrun in Nigerian federal government projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Idris, M M (1998) Assessment of the factors influencing the maintenance programme of a large university building in Riyadh. Construction Management and Economics, 16(6), pp. 673-679. ISSN 01446193
Idrus, A and Newman, J (2003) Ifess: A computer tool to aid structural engineers at the conceptual design stage. Construction Innovation, 3(3), pp. 127-143. ISSN 1471-4175
Igwe, C; Nasiri, F and Hammad, A (2022) Construction workspace management: Critical review and roadmap. International Journal of Construction Management, 22(10), pp. 1960-1973. ISSN 1562-3599
Igwe, C; Nasiri, F and Hammad, A (2022) An empirical study on non-physical waste factors in the construction industry. Engineering, Construction and Architectural Management, 29(10), pp. 4088-4106. ISSN 0969-9988
Igwe, U S; Mohamed, S F; Dzahir, M A M; Yusof, Z M and Khiyon, N A (2022) Towards a framework of automated resource model for post contract cost control of construction projects. International Journal of Construction Management, 22(16), pp. 3088-3097. ISSN 1562-3599
Ijaola, I A (2017) Training practices and task performance of professionals in construction firms in Lagos and Abuja, Nigeria. PhD thesis, University of Lagos, Nigeria.
Ikuabe, M; Clinton, C; Ebekozien, A and Mambane, S (2025) Contextualising the challenges of the built environment programme accreditation in HEIs in South Africa. International Journal of Building Pathology and Adaptation, 43(8), pp. 108-123. ISSN 2398-4708
Ikuabe, M; Aigbavboa, C and Kissi, E (2023) Potential applications and benefits of humanoids in the construction industry: A south African perspective. International Journal of Building Pathology and Adaptation, 41(6), pp. 254-268. ISSN 23984708
Ikuabe, M; Aigbavboa, C; Thwala, W; Chiyangwa, D and Oke, A (2023) Risks of joint venture formation in the South African construction industry. International Journal of Construction Management, 23(14), pp. 2391-2399. ISSN 1562-3599
Ikudayisi, A E and Adegun, O B (2025) Pathways for green building acceleration in fast-growing countries: A case study on Nigeria. Built Environment Project and Asset Management, 15(3), pp. 450-466. ISSN 2044-124X
Ilbeigi, M; Ashuri, B and Shayegh, S (2016) Price adjustment clauses and submitted bid prices for major asphalt line items in highway projects. Journal of Construction Engineering and Management, 142(5): 04015103, ISSN 0733-9364
Ilozor, B D and Ilozor, D B (2006) Open-planning concepts and effective facilities management of commercial buildings. Engineering, Construction and Architectural Management, 13(4), pp. 396-412. ISSN 0969-9988
Ilter, D (2012) Identification of the relations between dispute factors and dispute categories in construction projects. International Journal of Law in the Built Environment, 4(1), pp. 45-59. ISSN 1756-1450
Ilyas, M; Shaojun, C; Li, Y; Ahmad, S and Hamza, A (2024) Cause analysis of delay in development induced displacement and resettlement (didr) project. A case study of diamer basha dam project in Pakistan. International Journal of Construction Management, 24(5), pp. 551-560. ISSN 1562-3599
Imam, H (2021) Roles of shared leadership, autonomy, and knowledge sharing in construction project success. Journal of Construction Engineering and Management, 147(7): 04021067, ISSN 0733-9364
Imriyas, K; Pheng, L S and Teo, E A L (2007) A fuzzy knowledge-based system for premium rating of workers' compensation insurance for building projects. Construction Management and Economics, 25(11), pp. 1177-1195. ISSN 01446193
Indrastuti (2014) Unit cost modelling of public building project in Kepulauan Riau, Indonesia. PhD thesis, University of Malaya, Malaysia.
Ingirige, B and Sexton, M (2006) Alliances in construction: Investigating initiatives and barriers for long-term collaboration. Engineering, Construction and Architectural Management, 13(5), pp. 521-535. ISSN 0969-9988
Innella, Filomena (2020) Performance of building modules production and transportation. PhD thesis, Monash University, Australia.
Innocent Jr., M J F (2018) Predicting military construction project time outcomes using data analytics. PhD thesis, George Washington University, USA.
Invernizzi, D C (2019) Benchmarking nuclear decommissioning. PhD thesis, University of Leeds, UK.
Invernizzi, D C; Locatelli, G and Brookes, N J (2020) Characterising nuclear decommissioning projects: An investigation of the project characteristics that affect the project performance. Construction Management and Economics, 38(10), pp. 947-963. ISSN 01446193
Inácio, M F M (1999) The building deconstruction process and the debris trail: towards a dynamic model. PhD thesis, University of Salford, UK.
Ioannou, P G and Awwad, R E (2010) Below-average bidding method. Journal of Construction Engineering and Management, 136(9), pp. 936-946. ISSN 0733-9364
Ioannou, P G and Leu, S S (1993) Average-bid method: competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147. ISSN 0733-9364
Ioannou, P G and Yang, I T (2016) Repetitive scheduling method: Requirements, modeling, and implementation. Journal of Construction Engineering and Management, 142(5): 04016002, ISSN 0733-9364
Ip, K; Miller, A and Ellis, J (2003) Criteria and measurement of indoor air quality in sustainable buildings. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Ipsilandis, P G (2007) Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management, 133(6), pp. 417-424. ISSN 0733-9364
Iranagh, M A and Sonmez, R (2012) A genetic algorithm for resource levelling of construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(1), pp. 59-87. ISSN 01446193
Irewolede Aina, I; Godwin Iroroakpo, I and Michael Gbolagade, O (2021) Key training practice indicators for optimal site supervisors' utilisation in construction firms. Journal of Engineering, Design and Technology, 19(1), pp. 149-163. ISSN 1726-0531
Irfan, M; Khalid, R A; Kaka Khel, S S U H; Maqsoom, A and Sherani, I K (2023) Impact of work–life balance with the role of organizational support and job burnout on project performance. Engineering, Construction and Architectural Management, 30(1), pp. 154-171. ISSN 0969-9988
Irfan, M; Malik, M S A and Kaka Khel, S S U H (2020) Effect of factors of organizational structure influencing nonphysical waste in road projects of developing countries. Engineering, Construction and Architectural Management, 27(10), pp. 3135-3153. ISSN 0969-9988
Irizarry, J (2005) Safety issues in steel erection: Impact on task durations and risk perception of ironworkers. PhD thesis, Purdue University, USA.
Irizarry, J (2011) Application of methods analysis to steel erection tasks: Identification of factors affecting labor performance. International Journal of Construction Management, 11(4), pp. 31-47. ISSN 1562-3599
Irizarry, J; Simonsen, K L and Abraham, D M (2005) Effect of safety and environmental variables on task durations in steel erection. Journal of Construction Engineering and Management, 131(12), pp. 1310-1319. ISSN 0733-9364
Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD thesis, University of Lagos, Nigeria.
Irving, P A (2016) Explicating excessive financial resource allocation by building control in achieving regulatory conformity in domestic extensions. PhD thesis, University of Salford, UK.
Isaac, S and Navon, R (2014) Can project monitoring and control be fully automated? Construction Management and Economics, 32(6), pp. 495-505. ISSN 01446193
Isaacs, J; Falconer, R; Gilmour, D and Blackwood, D (2010) Modelling and visualizing sustainability assessment in urbanenvironments. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Isah, M A and Kim, B S (2025) Question-answering system powered by knowledge graph and generative pretrained transformer to support risk identification in tunnel projects. Journal of Construction Engineering and Management, 151(1): 04024193, ISSN 0733-9364
Isaksson, T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.
Ishak, N and Abdul-Aziz, A R (2014) Malaysian construction professionals: Why are they leaving? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ishdorj, S; Ahn, C R and Park, M (2024) Major factors influencing safety knowledge-sharing behaviors of construction field workers: Worker-to-worker level safety communication. Journal of Construction Engineering and Management, 150(4): 04024021, ISSN 0733-9364
Isiadianso, C (2007) Integrating deconstruction into the project delivery process. PhD thesis, Loughborough University, UK.
Isidore, L J (1999) Integrated range estimating and probabilistic scheduling of construction projects. PhD thesis, Texas A&M University, USA.
Isidore, L J and Back, W E (2001) Probabilistic optimal-cost scheduling. Journal of Construction Engineering and Management, 127(6), pp. 431-437. ISSN 0733-9364
Isidore, L J and Back, W E (2002) Multiple simulation analysis for probabilistic cost and schedule integration. Journal of Construction Engineering and Management, 128(3), pp. 211-219. ISSN 0733-9364
Isidore, L J; Back, W E and Fry, G T (2001) Integrated probabilistic schedules and estimates from project simulated data. Construction Management and Economics, 19(4), pp. 417-426. ISSN 01446193
Isiofia, L A; Ibem, E O; Uzuegbunam, F O and Iloeje, A F (2024) Causes of time overrun in fixed price contracts of tertiary education trust fund (TETFund) building projects in Enugu State, Southeast Nigeria. International Journal of Construction Management, 24(11), pp. 1201-1214. ISSN 1562-3599
Iskandar, K A; Hanna, A S and Lotfallah, W (2019) Modeling the performance of healthcare construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 2023-2039. ISSN 0969-9988
Iskandarani, H; Proverbs, D G and Xiao, H (2023) Towards improving the design and planning of post-conflict housing reconstruction projects: A conceptual framework. Built Environment Project and Asset Management, 13(2), pp. 253-269. ISSN 2044-124X
Islam, M A; Shetu, M M and Hakim, S S (2022) Possibilities of a gender-responsive infrastructure for livelihood-vulnerable women's resilience in rural-coastal Bangladesh. Built Environment Project and Asset Management, 12(3), pp. 447-466. ISSN 2044-124X
Islam, M S (2024) Identification of seasonal drought and its impacts on cropping season in Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 516-529. ISSN 1759-5916
Ismaeel, W S E; Alamoudy, F O and Sameh, R (2023) How renovation activities may jeopardise indoor air quality: Accounting for short and long-term symptoms of sick building syndrome in educational buildings. Architectural Engineering and Design Management, 19(4), pp. 360-377. ISSN 1745-2007
Ismail, F; Ruikar, K D; Carrillo, P and Anumba, C J (2009) Technology transfer in construction: Learning from the manufacturing industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Ismail, I A (2014) Financial cash flow determinants of company failure in the construction industry. PhD thesis, University of Michigan, USA.
Ismail, Noor Akmal Adillah Binti (2017) Construction cost estimating incorporating building information modelling in the Malaysian construction industry. PhD thesis, Queensland University of Technology, Australia.
Ismail, S (2013) Analyzing coordination function within a governance structure: Evidence from case studies of selected housing projects in Malaysia. PhD thesis, University of Malaya, Malaysia.
Ismail, S; Mohamad, R and Mohd Said, J (2022) Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia. Built Environment Project and Asset Management, 12(5), pp. 704-718. ISSN 2044-124X
Ismail, Z A (2023) Improving failure risk by better planning and safety for precast beam-to-column connection elements using physical internet-enabled building information modeling technology: A Malaysian case study. International Journal of Building Pathology and Adaptation, 41(3), pp. 517-532. ISSN 23984708
Israel, B (2023) The impact of clients' procurement challenges on the substance goals of roads construction projects in songwe, Tanzania. International Journal of Construction Management, 23(12), pp. 2144-2150. ISSN 1562-3599
Isuri Anuradha, A; Soorige, D and Geekiyanage, D (2021) Comparative study on life cycle assessment of buildings in developed countries and Sri Lanka. Built Environment Project and Asset Management, 11(2), pp. 304-329. ISSN 2044-124X
Ivanoff, D J and Diekmann, J E (1989) Project-labor agreements in construction industry. Journal of Construction Engineering and Management, 115(4), pp. 567-584. ISSN 0733-9364
Ive, G (2006) Re-examining the costs and value ratios of owning and occupying buildings. Building Research & Information, 34(3), pp. 230-245. ISSN 0961-3218
Iyer, K C and Jha, K N (2003) Analysis of critical coordination activities of Indian construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Iyer, K C and Jha, K N (2006) Critical factors affecting schedule performance: Evidence from Indian construction projects. Journal of Construction Engineering and Management, 132(8), pp. 871-881. ISSN 0733-9364
Iyer, K C and Sagheer, M (2010) Hierarchical structuring of PPP risks using interpretative structural modeling. Journal of Construction Engineering and Management, 136(2), pp. 151-159. ISSN 0733-9364
Iyer-Raniga, U and Wingrove, D (2012) Curriculum innovation in transnational teaching: A pilot study. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Jaafar, K and El-Halawani, L I (2022) Simulation-based multi-objective optimization model for machinery allocation in shallow foundation. International Journal of Construction Management, 22(15), pp. 2845-2854. ISSN 1562-3599
Jaafar, M; Salim, N A A; Salleh, N M; Sulieman, M Z; Ulang, N M and Ebekozien, A (2023) Developing a framework for fire safety management plan: The case of Malaysia's public hospital buildings. International Journal of Building Pathology and Adaptation, 41(4), pp. 713-733. ISSN 23984708
Jaafar, T (1992) A unified methodology for project planning risk. PhD thesis, Nottingham Trent University, UK.
Jaafari, A (1984) Criticism of CPM for project planning analysis. Journal of Construction Engineering and Management, 110(2), pp. 222-233. ISSN 0733-9364
Jaafari, A; Manivong, K K and Chaaya, M (2001) Vircon: Interactive system for teaching construction management. Journal of Construction Engineering and Management, 127(1), pp. 66-75. ISSN 0733-9364
Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.
Jackson, S (2002) Project cost overruns and risk management. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Jacobs, C and Jacobs, K (2003) An integrated approach to curriculum at foundation level. Journal of Engineering, Design and Technology, 1(1), pp. 89-101. ISSN 1726-0531
Jacobs, C and Miller, S (2003) An integrated approach to project work: An exploration of assessment practices from lecturer perspectives. Journal of Engineering, Design and Technology, 1(1), pp. 75-87. ISSN 1726-0531
Jacobsson, M and Linderoth, H C J (2010) The influence of contextual elements, actors' frames of reference, and technology on the adoption and use of ICT in construction projects: A Swedish case study. Construction Management and Economics, 28(1), pp. 13-23. ISSN 1466433X
Jadhav, Ajay (2023) Development of scope of services for procurement of professional consultant services on transportation projects: A study of South carolina department of transportation. PhD thesis, Clemson University, USA.
Jafari, K G; Nozhat Sadat Ghazi, S and Noorzai, E (2021) BIM-based integrated solution for analysis and management of mismatches during construction. Journal of Engineering, Design and Technology, 19(1), pp. 81-102. ISSN 1726-0531
Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.
Jagannathan, M and Delhi, V S K (2023) Paths leading contractual disputes to litigation. Built Environment Project and Asset Management, 13(6), pp. 846-861. ISSN 2044-124X
Jaggar, D and Ross, A (2003) A survey into the effectiveness of web-based teaching of building design cost management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Jain, N R; Rawal, R; Vardhan, V and Dey, S (2021) Performance metrics for room air-conditioners: Energy, comfort and environmental impacts. Buildings & Cities, 2(1), pp. 666-687. ISSN 2632-6655
Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.
Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599
Jaiswal, S and Kar, S (2025) A decision support system for optimizing labor acquisition in construction. Journal of Construction Engineering and Management, 151(12): 04025211, ISSN 0733-9364
Jambol, D D; Molwus, J J and Daniel, M M (2013) Re-thinking the approaches to mass housing delivery in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
James, M; Moyo, T and Moyo, C (2025) Climate change literacy objectives for construction professionals in Zimbabwe. Built Environment Project and Asset Management, 15(1), pp. 85-105. ISSN 2044-124X
Jang, J (2008) Improving the make-ready process and forecasting project performance using performance of the make-ready process. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Jannadi, M O (1997) An effective safety programme for a concrete product manufacturing plant. Building Research & Information, 25(2), pp. 92-100. ISSN 0961-3218
Jansma, G L (1987) A methodology for making construction productivity comparisons. PhD thesis, University of Texas at Austin, USA.
Jaradat, S; Whyte, J and Luck, R (2013) Professionalism in digitally mediated project work. Building Research & Information, 41(1), pp. 51-59. ISSN 0961-3218
Jaraiedi, M; Plummer, R W and Aber, M S (1995) Incentive/disincentive guidelines for highway construction contracts. Journal of Construction Engineering and Management, 121(1), pp. 112-120. ISSN 0733-9364
Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction. PhD thesis, University of Dundee, UK.
Jarkas, A M (2013) Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(1), pp. 53-75. ISSN 1366-4387
Jaselskis, E J (1988) Achieving construction project success through predictive discrete choice models. PhD thesis, University of Texas at Austin, USA.
Jaselskis, E J and Ashley, D B (1991) Optimal allocation of project management resources for achieving success. Journal of Construction Engineering and Management, 117(2), pp. 321-340. ISSN 0733-9364
Jaselskis, E J; Han, H C; Grigas, J; Tan, L and Fahrion, D (2001) Status of roller mountable microwave asphalt pavement density sensor. Journal of Construction Engineering and Management, 127(1), pp. 46-52. ISSN 0733-9364
Jaselskis, E J and Suazo, G A R (1994) A survey of construction site safety in Honduras. Construction Management and Economics, 12(3), pp. 245-255. ISSN 01446193
Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations. PhD thesis, Luleå University of Technology, Sweden.
Javanmardi, A (2019) Strategies and predictive models for reducing workflow variability in construction production systems. PhD thesis, North Carolina State University, USA.
Javed, N; Thaheem, M J; Bakhtawar, B; Nasir, A R; Khan, K I A and Gabriel, H F (2020) Managing risk in green building projects: Toward a dedicated framework. Smart and Sustainable Built Environment, 9(2), pp. 156-173. ISSN 2046-6099
Jayakody, C; Malalgoda, C I; Amaratunga, D; Haigh, R; Liyanage, C; Hamza, M; Witt, E and Fernando, N (2022) Addressing housing needs of the displaced people promoting resilient and sustainable communities. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 368-385. ISSN 1759-5916
Jayaraj, S; Doerfel, M L and Williams, T (2022) Clique to win: Impact of cliques, competition, and resources on team performance. Journal of Construction Engineering and Management, 148(7): 04022047, ISSN 0733-9364
Jayawardane, A K W and Harris, F C (1990) Further development of integer programming in earthwork optimization. Journal of Construction Engineering and Management, 116(1), pp. 18-34. ISSN 0733-9364
Jaśkowski, P and Sobotka, A (2006) Scheduling construction projects using evolutionary algorithm. Journal of Construction Engineering and Management, 132(8), pp. 861-870. ISSN 0733-9364
Jeelani, I; Albert, A; Han, K and Azevedo, R (2018) Are visual search patterns predictive of hazard recognition performance? Empirical investigation using eye-tracking technology. Journal of Construction Engineering and Management, 145(1): 04018115, ISSN 0733-9364
Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988
Jefferies, M; Chen, S E and Conway, J (2002) Assessment of professional competence in a construction management problem-based learning setting. Construction Economics and Building, 2(1), pp. 47-56. ISSN 2204-9029
Jennings, W (2012) Why costs overrun: Risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(6), pp. 455-462. ISSN 1466433X
Jens, K and Gregg, J S (2021) The impact on human behaviour in shared building spaces as a result of COVID-19 restrictions. Building Research & Information, 49(8), pp. 827-841. ISSN 0961-3218
Jeong, J G (2006) A framework for supply chain modeling and optimization for the manufactured housing industry. PhD thesis, Purdue University, USA.
Jeong, K S; Lu, S L and Sexton, M G (2010) Good practice transfer within small construction specialist trade contractors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Jepson, A S (2009) Investigating cultural relationships within the festival planning and construction process in a local community festival context. PhD thesis, University of Derby, UK.
Jergeas, G F (1989) Detailed design and constructability. PhD thesis, Loughborough University, UK.
Jesson, J K (1988) Ethnic minority builders: a comparative study of Britain and the United States of America on affirmative action in the building industry. PhD thesis, Aston University, UK.
Jewell, C A (2011) A typology of construction professional service firms: A consulting engineering perspective. PhD thesis, University of Reading, UK.
Jeyakumar, R (2013) The implementation and effectiveness of value engineering in the United Arab Emirates. PhD thesis, University of Glamorgan, UK.
Jha, K N and Chockalingam, C T (2011) Prediction of schedule performance of Indian construction projects using an artificial neural network. Construction Management and Economics, 29(9), pp. 901-911. ISSN 1466433X
Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(4), pp. 409-421. ISSN 1466433X
Jia, A. Y. and Luk, C. W. (2026) From techno-optimism to value co-creation: A circular value system analysis on the modular transitional housing programme in Hong Kong. Construction Management and Economics, 44(7), pp. 537-563. ISSN 0144-6193
Jia, A Y; Loosemore, M; Gilbert, D and Rowlinson, S (2016) Shielding workers from heat stress: Reconciling the paradoxes of protection and production logics. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Jia, Y A; Rowlinson, S; Kvan, T; Lingard, H C and Yip, B (2009) Burnout among Hong Kong Chinese architecture students: The paradoxical effect of Confucian conformity values. Construction Management and Economics, 27(3), pp. 287-298. ISSN 1466433X
Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364
Jiang, L; Zhong, H; Chen, J; Cheng, J; Chen, S; Gong, Z; Lun, Z; Zhang, J and Su, Z (2023) Study on the construction workforce management based on lean construction in the context of COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3310-3329. ISSN 0969-9988
Jiang, Y and Wu, H (2007) A method for highway agency to estimate highway construction durations and set contract times. International Journal of Construction Education and Research, 3(3), pp. 199-216. ISSN 1557-8771
Jiang, Ziang (2025) Advancing scan-vs-BIM in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.
Jiang, Ziang (2025) Advancing scan-vs-bim in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.
Jijingi, A T (2019) A BIM-enabled procurement framework in new buildings for the Nigerian architecture, engineering and construction industry. PhD thesis, University of Portsmouth, UK.
Jin, F; Xiang, W; Ji, Z and Zhang, B (2023) Quantifying the evolutionary mechanism of COVID-19 impact on international construction multi-projects: A risk driver perspective. Engineering, Construction and Architectural Management, 30(8), pp. 3602-3619. ISSN 0969-9988
Jin, R; Guo, B; Adamu, Z; Kangwa, J and Navpreet, C (2021) A critical analysis of collaborative and disruptive digital-driven built environment education. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Jin, R; Han, S; Hyun, C and Cha, Y (2016) Application of case-based reasoning for estimating preliminary duration of building projects. Journal of Construction Engineering and Management, 142(2): 04015082, ISSN 0733-9364
Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988
Jin, R; Zuo, J and Hong, J (2019) Scientometric review of articles published in ASCE's journal of construction engineering and management from 2000 to 2018. Journal of Construction Engineering and Management, 145(8): 06019001, ISSN 0733-9364
Jin, X H and Ling, F Y Y (2005) Model for fostering trust and building relationships in China's construction industry. Journal of Construction Engineering and Management, 131(11), pp. 1224-1232. ISSN 0733-9364
Jin, Y (2018) Supervised learning for back analysis of excavations in the observational method. PhD thesis, University of Cambridge, UK.
Joannides, M M; Olbina, S and Issa, R R A (2012) Implementation of building information modeling into accredited programs in architecture and construction education. International Journal of Construction Education and Research, 8(2), pp. 83-100. ISSN 1557-8771
Johansen, A; Collins, D; Temeljotov-Salaj, A and Hagehaugen, G (2022) By the fjord: Successful public and private collaboration in a neighbourhood redevelopment project in Norway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(4), pp. 156-165. ISSN 17514304
Johansen, E (2002) The application of a pilot pull planning system to construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Johansen, E and Wilson, B (2006) Investigating first planning in construction. Construction Management and Economics, 24(12), pp. 1305-1314. ISSN 1466433X
Johansen, K W; Hong, K; Schultz, C and Teizer, J (2024) Automated quantification of construction workers’ exposure to falling object hazards. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 207-222. ISSN 17514304
Johansson, B O H (2011) The post-war destruction of Swedish cities. Building Research & Information, 39(4), pp. 412-429. ISSN 0961-3218
Johar, N (2017) Community participation: A cementing process, theorizing various dimensions and approaches. Journal of Construction in Developing Countries, 22(S1), pp. 47-61. ISSN 1823-6499
Johari, S and Jha, K N (2020) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(2), pp. 321-340. ISSN 0969-9988
John, G (2007) Assessment of the use of resource scheduling facilities in project management software packages for large contractors. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Johnson, B T (2007) Exploring the use of virtual construction to capture knowledge and reduce waste for residential projects. PhD thesis, Colorado State University, USA.
Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402-411. ISSN 1562-3599
Jones, K; Desai, A; Brosnan, N; Cooper, J and Ali, F (2017) Built asset management climate change adaptation model. International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 263-274. ISSN 1759-5916
Jones, P; Lannon, S and Patterson, J (2013) Retrofitting existing housing: How far, how much? Building Research & Information, 41(5), pp. 532-550. ISSN 0961-3218
Jones, W; Gibb, A G F and Chow, V (2022) Adapting to COVID-19 on construction sites: What are the lessons for long-term improvements in safety and worker effectiveness? Journal of Engineering, Design and Technology, 20(1), pp. 66-85. ISSN 1726-0531
Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.
Jonsson, H (2018) Production strategy in project based production within a house-building context. PhD thesis, Linköping University, Sweden.
Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.
Jordan Srour, F; Kiomjian, D and Srour, I M (2018) Automating the use of learning curve models in construction task duration estimates. Journal of Construction Engineering and Management, 144(7): 04018055, ISSN 0733-9364
Jordanour, F; Kiomjian, D and Srour, I M (2016) Learning curves in construction: A critical review and new model. Journal of Construction Engineering and Management, 142(4): 06015004, ISSN 0733-9364
Josephson, P E and Chao, M (2014) Use and non-use of time in construction of new multi-dwelling buildings in Sweden. International Journal of Construction Management, 14(1), pp. 28-35. ISSN 1562-3599
Joubert, F J (2015) Risk simulation in a portfolio of port and rail capital projects. PhD thesis, University of Pretoria, South Africa.
Joukar, A (2016) Analysis and management of the price volatility in the construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Joutsiniemi, A; Vaattovaara, M and Airaksinen, J (2021) Empowered by planning law: Unintended outcomes in the Helsinki region. Buildings & Cities, 2(1), pp. 837-855. ISSN 2632-6655
Joy Vasantha Rani, S P and Aruna Prabha, K (2010) Stochastic logic computation based rbfnn with adaptive hidden layer structure. Journal of Engineering, Design and Technology, 8(2), pp. 206-220. ISSN 1726-0531
Joyce, S (2016) Performance driven design systems in practice. EngD thesis, University of Bath, UK.
Ju, Q; Dai, Y; Liu, H and Shen, Z (2026) Interface management of complex capital projects from the perspective of interface clusters: Using complex networks and spectral clustering methods. Journal of Construction Engineering and Management, 152(2): 04025257, ISSN 0733-9364
Ju, C (2015) A study of institutional complexity and contractors' safety management strategies. PhD thesis, University of Hong Kong, Hong Kong.
Judson, E P and Maller, C (2014) Housing renovations and energy efficiency: Insights from homeowners practices. Building Research & Information, 42(4), pp. 501-511. ISSN 0961-3218
Jukic, D and Carmichael, D G (2016) Emission and cost effects of training for construction equipment operators: A field study. Smart and Sustainable Built Environment, 5(2), pp. 96-110. ISSN 2046-6099
Juliana, A; Oladimeji, O; Abiodun, A O; Haddad, A N and Tam, V W Y (2024) Influence of rework on construction project performance in Nigeria. International Journal of Construction Management, 24(8), pp. 888-893. ISSN 1562-3599
Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364
Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364
Jung, S (2010) Facility siting and layout optimization based on process safety. PhD thesis, Texas A&M University, USA.
Jung, Y (1997) Information systems planning methodology for the construction industry. PhD thesis, University of Texas at Austin, USA.
Jung, Y and Kang, S (2007) Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management, 133(1), pp. 10-21. ISSN 0733-9364
Jung, Y and Woo, S (2004) Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management, 130(5), pp. 616-625. ISSN 0733-9364
Jung, Y J (2007) Subsurface utility engineering for highway projects: A study of utility impact rating and benefit-cost analysis. PhD thesis, Pennsylvania State University, USA.
Junga, W J (1981) The building cycle, shorter cycles of residential construction and federal housing programs: An empirical and theoretical analysis. PhD thesis, University of Connecticut, USA.
Kadry, M; Osman, H and Georgy, M (2017) Causes of construction delays in countries with high geopolitical risks. Journal of Construction Engineering and Management, 143(2): 04016095, ISSN 0733-9364
Kaewmoracharoen, M (2009) Feasibility of visualization and simulation applications to improve work zone safety and mobility. PhD thesis, Iowa State University, USA.
Kaggiah, G M B (2022) Strategies for improving the sustainability of SMEs in the construction industry in Malawi. PhD thesis, University of Bolton, UK.
Kaka, A and Price, A D F (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), pp. 383-400. ISSN 01446193
Kaka, A P (1996) Towards more flexible and accurate cash flow forecasting. Construction Management and Economics, 14(1), pp. 35-44. ISSN 01446193
Kaka, A P (1999) The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(3), pp. 256-266. ISSN 0969-9988
Kaka, A P and Cheetham, D W (1997) The effect of some tendering and payment strategies on contractors' financial performance. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Kaka, A P and Fortune, C (2002) Net cash flow models: Towards the black box approach. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(1), pp. 48-60. ISSN 0969-9988
Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988
Kakitahi, J M (2014) Causality, magnitude and impact mitigation of rework in Uganda. PhD thesis, Lund University, Sweden.
Kalach, M; Abdul-Malak, M A and Srour, I (2021) Design information release under alternative design-construction modes. Engineering, Construction and Architectural Management, 28(4), pp. 969-993. ISSN 0969-9988
Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.
Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(3), pp. 211-222. ISSN 0969-9988
Kallantzis, A; Soldatos, J and Lambropoulos, S (2007) Linear versus network scheduling: A critical path comparison. Journal of Construction Engineering and Management, 133(7), pp. 483-491. ISSN 0733-9364
Kaluarachchi, Y (2013) The awareness of two stakeholders and the resilience of their built assets to extreme weather events in England. International Journal of Disaster Resilience in the Built Environment, 4(3), pp. 297-316. ISSN 1759-5916
Kalz, D E; Pfafferott, J; Herkel, S and Wagner, A (2009) Building signatures correlating thermal comfort and low-energy cooling: In-use performance. Building Research & Information, 37(4), pp. 413-432. ISSN 0961-3218
Kamal, A; Abas, M; Khan, D and Azfar, R W (2022) Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. International Journal of Construction Management, 22(6), pp. 1141-1157. ISSN 1562-3599
Kamar, K A M (2011) Critical success factors to industrialised building system (IBS) contractor. PhD thesis, University of Salford, UK.
Kamari, M and Ham, Y (2025) Advancing 3D object detection and segmentation in construction jobsites using an open vocabulary approach. Journal of Construction Engineering and Management, 151(10): 04025141, ISSN 0733-9364
Kamat, V R; Martinez, J C; Fischer, M; Golparvar-Fard, M; Pea-Mora, F and Savarese, S (2011) Research in visualization techniques for field construction. Journal of Construction Engineering and Management, 137, pp. 853-862. ISSN 0733-9364
Kaming, P F; Olomolaiye, P O; Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94. ISSN 01446193
Kammouh, O; Nogal, M; Binnekamp, R and Wolfert, A R M (2021) Mitigation controller: Adaptive simulation approach for planning control measures in large construction projects. Journal of Construction Engineering and Management, 147(8): 04021093, ISSN 0733-9364
Kampschroer, K and Heerwagen, J H (2005) The strategic workplace: Development and evaluation. Building Research & Information, 33(4), pp. 326-337. ISSN 0961-3218
Kan, C; Fang, Y; Anumba, C J and Messner, J I (2018) A cyber-physical system (CPS) for planning and monitoring mobile cranes on construction sites. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(6), pp. 240-250. ISSN 17514304
Kanagasabapathi, B and Ananthanarayanan, K (2005) A simulation model for resource constrained scheduling of multiple projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kanai, Júlia (2025) Systematic management model based on lean construction through a mobile app for industrialized buildings in the frame system. PhD thesis, Universidade Estadual de Campinas, Brazil.
Kandil, A and El-Rayes, K (2006) Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. Journal of Construction Engineering and Management, 132(5), pp. 491-498. ISSN 0733-9364
Kandil, A; El-Rayes, K and El-Anwar, O (2010) Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction Engineering and Management, 136(1), pp. 17-25. ISSN 0733-9364
Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kanellopoulos, G (2022) External fire spread from timber lined compartments. PhD thesis, University of Edinburgh, UK.
Kang, H-Y (2001) Web-based four-dimensional visualization for constuction scheduling. PhD thesis, Texas A&M University, USA.
Kang, J H; Anderson, S D and Clayton, M J (2007) Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling. Journal of Construction Engineering and Management, 133(6), pp. 447-461. ISSN 0733-9364
Kang, L S; Park, I C and Lee, B H (2001) Optimal schedule planning for multiple, repetitive construction process. Journal of Construction Engineering and Management, 127(5), pp. 382-390. ISSN 0733-9364
Kang, L S and Paulson, B C (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management, 124(5), pp. 381-389. ISSN 0733-9364
Kang, Y; O'Brien, W J; Thomas, S and Chapman, R E (2008) Impact of information technologies on performance: Cross study comparison. Journal of Construction Engineering and Management, 134(11), pp. 852-863. ISSN 0733-9364
Kangari, R; Pruitt, J D and Cheema, T S (1988) Slipforming IBM tower. Journal of Construction Engineering and Management, 114(3), pp. 472-488. ISSN 0733-9364
Kanit, R; Gunduz, M and Ozkan, O (2009) Investigating the effectiveness of certain priority rules on resource scheduling of housing estate projects. Journal of Construction Engineering and Management, 135(7), pp. 609-613. ISSN 0733-9364
Kannan, G and Vorster, M (2000) Development of an experience database for truck loading operations. Journal of Construction Engineering and Management, 126(3), pp. 201-209. ISSN 0733-9364
Kannimuthu, M; Raphael, B; Ekambaram, P and Kuppuswamy, A (2020) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(4), pp. 893-916. ISSN 0969-9988
Kannimuthu, M; Raphael, B; Palaneeswaran, E and Kuppuswamy, A (2019) Optimizing time, cost and quality in multi-mode resource-constrained project scheduling. Built Environment Project and Asset Management, 9(1), pp. 44-63. ISSN 2044-124X
Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(4), pp. 272-282. ISSN 0969-9988
Kanoglu, A and Arditi, D (2001) A computer-based information system for architectural design offices. Construction Innovation, 1(1), pp. 15-29. ISSN 1471-4175
Kapote, M M and Pimplikar, S S (2025) Identification of challenges and shortcomings in the selection of bidders on road projects in India: a study. International Journal of Construction Management, 25(7), pp. 760-769. ISSN 1562-3599
Kappia, J G (2006) Career dynamics within the construction industry: a trade and craft perspective. PhD thesis, Loughborough University, UK.
Kappia, J G; Dainty, A R J and Price, A D F (2006) Using qualitative methods to explore career development for construction operatives. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.
Kar, S and Jha, K N (2019) Assessment of criticality of materials in a construction project. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Kar, S and Jha, K N (2020) Examining the effect of material management issues on the schedule and cost performance of construction projects based on a structural equation model: Survey of Indian experiences. Journal of Construction Engineering and Management, 146(9): 05020011, ISSN 0733-9364
Kar, S and Jha, K N (2021) Investigation into lead time of construction materials and influencing factors. Journal of Construction Engineering and Management, 147(3): 01998, ISSN 0733-9364
Kar, S and Jha, K N (2022) Assessing criticality of construction materials for prioritizing their procurement using ANP-TOPSIS. International Journal of Construction Management, 22(10), pp. 1852-1862. ISSN 1562-3599
Karaa, F A and Nasr, A Y (1986) Resource management in construction. Journal of Construction Engineering and Management, 112(3), pp. 346-357. ISSN 0733-9364
Karami, H and Olatunji, O A (2019) Key value engineering protocols in marine projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 21-31. ISSN 17514304
Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(7), pp. 1579-1594. ISSN 0969-9988
Karami, S (2008) Using by-product industrial materials to replace all cement in construction products. PhD thesis, Coventry University, UK.
Karaz, Mahmoud Abdel Fattah Abdel Athim (2024) Construction waste management model for contractors using lean and BIM tools. PhD thesis, Universidade do Minho, Portugal.
Karhu, V (2001) A generic construction process modelling method. PhD thesis, KTH Royal Institute of Technology, Sweden.
Karim, A and Adeli, H (1999) A new generation software for construction scheduling and management. Engineering, Construction and Architectural Management, 6(4), pp. 380-390. ISSN 0969-9988
Karim, A and Adeli, H (1999) CONSCOM: An OO construction scheduling and change management system. Journal of Construction Engineering and Management, 125(5), pp. 368-376. ISSN 0733-9364
Karim, A and Adeli, H (1999) OO information model for construction project management. Journal of Construction Engineering and Management, 125(5), pp. 361-367. ISSN 0733-9364
Karim, K; Marosszeky, M and Davis, S (2006) Managing subcontractor supply chain for quality in construction. Engineering, Construction and Architectural Management, 13(1), pp. 27-42. ISSN 0969-9988
Karimi, H (2017) Quantitative analysis of the impact of craft labor availability on construction project performance. PhD thesis, University of Kentucky, USA.
Karimi, H; Taylor, T R B and Goodrum, P M (2017) Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. Construction Management and Economics, 35(6), pp. 368-380. ISSN 01446193
Karki, S and Hadikusumo, B (2023) Machine learning for the identification of competent project managers for construction projects in Nepal. Construction Innovation, 23(1), pp. 1-18. ISSN 1471-4175
Karni, R (1987) A systematic approach to stochastic scheduling. Construction Management and Economics, 5(3), pp. 187-198. ISSN 01446193
Karpen, S (2013) The role of task openness in forming completion time estimates. PhD thesis, Indiana University, USA.
Karshenas, S (1981) Probabilistic evaluation of safety of buildings during construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193
Kartam, N A (1997) Integrating safety and health performance into construction CPM. Journal of Construction Engineering and Management, 123(2), pp. 121-126. ISSN 0733-9364
Kartam, N A-F (1989) Investigating the utility of artificial intelligence techniques for automatic generation of construction project plans. PhD thesis, Stanford University, USA.
Kartman, S A (1995) Reengineering construction planning systems. PhD thesis, University of California, Berkeley, USA.
Karumanasseri, G and Abourizk, S (2002) Decision support system for scheduling steel fabrication projects. Journal of Construction Engineering and Management, 128(5), pp. 392-399. ISSN 0733-9364
Karunarathna, D C; Perera, H A H P; Perera, B A K S and Disaratna, P A P V D S (2025) Influence of delay in utility shifting for extension of time claims in road construction projects in Sri Lanka. Smart and Sustainable Built Environment, 14(2), pp. 489-510. ISSN 2046-6099
Karunasena, G and Rameezdeen, R (2010) Post-disaster housing reconstruction: Comparative study of donor vs owner-driven approaches. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 173-191. ISSN 1759-5916
Karvonen, A (2013) Towards systemic domestic retrofit: A social practices approach. Building Research & Information, 41(5), pp. 563-574. ISSN 0961-3218
Karvonen, A and Hargreaves, T (2023) Data politics in the built environment. Buildings & Cities, 4(1), pp. 920-926. ISSN 2632-6655
Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175
Kashiwagi, D and Savicky, J (2003) A case study of the transaction cost and value of the delivering of construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Kasim, N B (2008) Improving materials management on construction projects. PhD thesis, Loughborough University, UK.
Kassem, M; Dawood, N and Mitchell, D (2012) A decision support system for the selection of curtain wall systems at the design development stage. Construction Management and Economics, 30(12), pp. 1039-1053. ISSN 1466433X
Kataoka, M (2008) Automated generation of construction plans from primitive geometries. Journal of Construction Engineering and Management, 134(8), pp. 592-600. ISSN 0733-9364
Katavic, M; Matic, S and Ceric, A (2005) The engineer's education in business and construction management. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Katsimpalis, E; Adey, B T and Haas, C T (2026) Automatically transforming virtual realitysimulations into project schedules. Journal of Construction Engineering and Management, 152(6): 04026059, ISSN 0733-9364
Katsuragawa, C M; Lucko, G; Isaac, S and Su, Y (2021) Fuzzy linear and repetitive scheduling for construction projects. Journal of Construction Engineering and Management, 147(3): 04021002, ISSN 0733-9364
Kauffold, P V (1977) Critical resource allocation in stochastic project networks. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kavanagh, D P (1985) SIREN: A repetitive construction simulation model. Journal of Construction Engineering and Management, 111(3), pp. 308-323. ISSN 0733-9364
Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.
Kaya, S; Hinks, J and Alexander, K (2005) Innovation in facilities supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kazar, G; Doǧan, N B; Ayhan, B U and Tokdemir, O B (2022) Quality failures-based critical cost impact factors: Logistic regression analysis. Journal of Construction Engineering and Management, 148(12): 04022138, ISSN 0733-9364
Ke, Y (2020) Impact of trust on the performance of construction enterprises: analysis of the cooperative process mechanism in the context of Chaoshan culture. DProf thesis, Fordham University, USA.
Keane, C (2012) Essays in social policy and labour economics. PhD thesis, University College Dublin, Ireland.
Keane, P J (1994) A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects. PhD thesis, Loughborough University, UK.
Keath, M (1983) The development of school construction systems in Hertfordshire 1946-64. PhD thesis, University of Greenwich, UK.
Kebriyaii, O; Heidari, A; Khalilzadeh, M and Pamucar, D (2025) A green project scheduling with material ordering problem considering cost constraints and quality of materials. Engineering, Construction and Architectural Management, 32(8), pp. 4991-5018. ISSN 0969-9988
Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.
Keeter, E H (1985) The development of a task inventory for baccalaureate programs in construction management (education, curriculum). PhD thesis, Texas A&M University, USA.
Kelley, M N (1991) Ft. Drum estimating and bidding from contractor's point of view. Journal of Construction Engineering and Management, 117(3), pp. 565-571. ISSN 0733-9364
Kelly, D and Ilozor, B (2019) A quantitative study of the relationship between project performance and BIM use on commercial construction projects in the USA. International Journal of Construction Education and Research, 15(1), pp. 3-18. ISSN 1557-8771
Kelly, D and Ilozor, B (2022) Performance outcome assessment of the integrated project delivery (IPD) method for commercial construction projects in USA. International Journal of Construction Management, 22(14), pp. 2808-2816. ISSN 1562-3599
Kelly, D J (2015) Investigating the relationships of project performance measures with the use of building information modeling (BIM) and integrated project delivery (IPD). PhD thesis, Eastern Michigan University, USA.
Kelly, J; Male, S and Gronqvist, M (2000) Characteristics of refurbishing retailers as clients of the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Kelly, S (2004) Making it work and making do: A study of best practice, computing and routine work in building firms. PhD thesis, Lancaster University, UK.
Kempton, J (2009) Modern methods of construction: Maintenance issues in the registered social landlord sector. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Kenley, R (2001) The predictive ability of bromilow's time-cost model: A comment. Construction Management and Economics, 19(8), pp. 759-764. ISSN 01446193
Kenley, R (2001) In-project end-date forecasting: An idiographic, deterministic approach, using cash-flow modelling. Journal of Financial Management of Property and Construction, 6(3), pp. 209-216. ISSN 1366-4387
Kenny, J; Curran, M; Spillane, J P and Brooks, T (2021) Do you want some sauce on that? Factors influencing dietary habits among the Irish construction workforce: A case study review. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Kerali, A G and Thomas, T H (2004) Simple durability test for cement stabilized blocks. Building Research & Information, 32(2), pp. 140-145. ISSN 0961-3218
Keraminiyage, K and Piyatadsananon, P (2013) Achieving success in post-disaster resettlement programmes through better coordination between spatial and socio-economic/cultural factors. International Journal of Disaster Resilience in the Built Environment, 4(3), pp. 352-372. ISSN 1759-5916
Kermanshachi, S (2016) Decision making and uncertainty analysis in success of construction projects. PhD thesis, Texas A&M University, USA.
Keswani, K (1997) The contribution of building centres to low-cost housing in India. Building Research & Information, 25(1), pp. 50-64. ISSN 0961-3218
Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.
Khalafallah, A and Shalaby, Y (2019) Change orders: Automating comparative data analysis and controlling impacts in public projects. Journal of Construction Engineering and Management, 145(11): 04019064, ISSN 0733-9364
Khalef, R and El-Adaway, I H (2024) Performance of project delivery methods for us airport projects: A holistic quantitative risk-based assessment through perceptions of associated industry experts. Journal of Construction Engineering and Management, 150(10): 04024141, ISSN 0733-9364
Khalfan, M M A (2001) Benchmarking and readiness assessment for concurrent engineering in construction (BEACON). PhD thesis, Loughborough University, UK.
Khalfan, M M A; Anumba, C J and Carrillo, P M (2001) Concurrent engineering readiness assessment of sub-contractors within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Khalfan, M M A; Anumba, C J and Carrillo, P M (2005) Concurrent engineering readiness assessment tool for construction. Architectural Engineering and Design Management, 1(3), pp. 163-179. ISSN 1745-2007
Khalifa, R I (2019) Evaluating project assessment techniques for high-profile transportation projects development and delivery: Case of state departments of transportation (DOTS) in the United States. PhD thesis, Portland State University, USA.
Khalili, A (2013) An IFC-based framework for optimizing level of prefabrication in industrialized building systems. PhD thesis, National University of Singapore, Singapore.
Khallaf, R (2016) Interactional risks associated with parties to a PPP project. PhD thesis, Purdue University, USA.
Khallaf, Z; Alshibani, A; Alsawafy, O; Mohammed, A and Bubshait, A (2024) Dynamic fleet configuration model for optimizing earthmoving operations using mixed integer linear programming. Journal of Construction Engineering and Management, 150(11): 04024152, ISSN 0733-9364
Khamaksorn, A; Nimmolrat, A; Mahat, N and Thinnukool, O (2023) An IDEF0 functional planning model for the development of an asset management framework: A case study of chiang mai university. Journal of Construction in Developing Countries, 28(1), pp. 133-150. ISSN 1823-6499
Khamooshi, H and Cioffi, D F (2013) Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling. Journal of Construction Engineering and Management, 139(5), pp. 488-497. ISSN 0733-9364
Khan, K I A; Flanagan, R and Lu, S L (2015) Managing the complexity of information flow for construction small and medium-sized enterprises (csmes) using system dynamics and collaborative technologies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Khan, K I A; Flanagan, R and Lu, S-L (2016) Managing information complexity using system dynamics on construction projects. Construction Management and Economics, 34(3), pp. 192-204. ISSN 0144-6193
Khan, S (2017) Using the last planner system and lean principles to improve workflow in BIM-based building design projects. PhD thesis, University of Huddersfield, UK.
Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.
Khawaja, E U R and Mustapha, A (2021) Mitigating disputes and managing legal issues in the era of building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 111-130. ISSN 1823-6499
Khazaeni, G and Khazaeni, A (2026) Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm. International Journal of Building Pathology and Adaptation, 44(1), pp. 208-222. ISSN 2398-4708
Khesal, T; Saghaei, A; Khalilzadeh, M; Rahiminezhad Galankashi, M and Soltani, R (2019) Integrated cost, quality, risk and schedule control through earned value management (EVM). Journal of Engineering, Design and Technology, 17(1), pp. 183-203. ISSN 1726-0531
Khodabocus, S and Seyis, S (2024) Multi-criteria decision-making model for risk management in modular construction projects. International Journal of Construction Management, 24(2), pp. 240-250. ISSN 1562-3599
Khodakarami, V (2009) Applying Bayesian networks to model uncertainty in project scheduling. PhD thesis, Queen Mary University of London, UK.
Khoshgoftar, M; Bakar, A H A and Osman, O (2010) Causes of delays in Iranian construction projects. International Journal of Construction Management, 10(2), pp. 53-69. ISSN 1562-3599
Khosrowshahi, F (1997) The optimum project duration and cost curve for Hong Kong public housing projects. Engineering, Construction and Architectural Management, 4(4), pp. 249-269. ISSN 0969-9988
Khosrowshahi, F (2002) Project cost-time optimal solutions. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Khosrowshahi, F and Alani, M (2003) Event and effect model of building maintenance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Kian Manesh Rad, E (2016) Development of a project complexity assessment method for energy megaprojects. PhD thesis, Heriot-Watt University, UK.
Kiani Mavi, N; Brown, K; Fulford, R G and Goh, M (2025) An MCDM analysis of critical success criteria for medium and large construction projects in Australia and New Zealand. Engineering, Construction and Architectural Management, 32(8), pp. 5160-5193. ISSN 0969-9988
Kidd, A; Appelbe, S and Morgan, A (2015) The use and abuse of programmes in construction contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 294-301. ISSN 17514304
Kifokeris, D and Tezel, A (2025) Blockchain and lean construction: An exploration of bidirectional synergies and interactions. Architectural Engineering and Design Management, 21(1), pp. 171-189. ISSN 1745-2007
Kikwasi, G (2016) Risk handling options: Is insurance a fair option to transfer construction risks in Tanzanian construction industry? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Kim, B C (2007) Forecasting project progress and early warning of project overruns with probabilistic methods. PhD thesis, Texas A&M University, USA.
Kim, B C and Kim, H J (2014) Sensitivity of earned value schedule forecasting to S-curve patterns. Journal of Construction Engineering and Management, 140(7): 04014023, ISSN 0733-9364
Kim, B C and Kim, S J (2015) Credibility evaluation of project duration forecast using forecast sensitivity and forecast-risk compatibility. Journal of Construction Engineering and Management, 141(8): 04015023, ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2009) Probabilistic forecasting of project duration using bayesian inference and the beta distribution. Journal of Construction Engineering and Management, 135(3), pp. 178-186. ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2010) Probabilistic forecasting of project duration using Kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), pp. 834-843. ISSN 0733-9364
Kim, C; Kim, H; Ryu, J and Kim, C (2011) Ubiquitous sensor network for construction material monitoring. Journal of Construction Engineering and Management, 137(2), pp. 158-165. ISSN 0733-9364
Kim, H (2002) Knowledge discovery and machine learning in construction project databases. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, H; Lee, H S; Park, M; Ahn, C R and Hwang, S (2015) Productivity forecasting of newly added workers based on time-series analysis and site learning. Journal of Construction Engineering and Management, 141(9): 5015008, ISSN 0733-9364
Kim, H; Orr, K; Shen, Z; Moon, H; Ju, K and Choi, W (2014) Highway alignment construction comparison using object-oriented 3D visualization modeling. Journal of Construction Engineering and Management, 140(10): 05014008, ISSN 0733-9364
Kim, I (2007) Development and implementation of an engineering productivity measurement system (EPMS) for benchmarking. PhD thesis, University of Texas at Austin, USA.
Kim, J (2004) Delay forecasting using a vulnerability index. PhD thesis, Purdue University, USA.
Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Kim, J (2007) Temporary structure planning ontology. PhD thesis, Stanford University, USA.
Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.
Kim, J J; Miller, J A and Kim, S (2020) Cost impacts of change orders due to unforeseen existing conditions in building renovation projects. Journal of Construction Engineering and Management, 146(8): 04020094, ISSN 0733-9364
Kim, J L (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics, 31(1), pp. 3-19. ISSN 1466433X
Kim, J L and Ellis, R D (2010) Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm. Journal of Construction Engineering and Management, 136(2), pp. 160-169. ISSN 0733-9364
Kim, J L and Ellis Jr, R D (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling. Journal of Construction Engineering and Management, 134(11), pp. 904-913. ISSN 0733-9364
Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.
Kim, K (2002) Distributed coordination of project schedule changes: An agent-based compensatory negotiation approach. PhD thesis, Stanford University, USA.
Kim, K (2003) A resource-constrained CPM (RCPM) scheduling and control technique with multiple calendars. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Kim, K; Cho, Y and Kim, K (2018) BIM-driven automated decision support system for safety planning of temporary structures. Journal of Construction Engineering and Management, 144(8): 04018072, ISSN 0733-9364
Kim, K and De La Garza, J M (2003) Phantom float. Journal of Construction Engineering and Management, 129(5), pp. 507-517. ISSN 0733-9364
Kim, K and De La Garza, J M (2005) Critical path method with multiple calendars. Journal of Construction Engineering and Management, 131(3), pp. 330-342. ISSN 0733-9364
Kim, K and De La Garza, J M (2005) Evaluation of the resource-constrained critical path method algorithms. Journal of Construction Engineering and Management, 131(5), pp. 522-532. ISSN 0733-9364
Kim, S (2008) Development of a wireless real-time productivity measurement system for rapid construction operations. PhD thesis, University of Kansas, USA.
Kim, S Y; Nguyen, M V and Dao, T T N (2021) Prioritizing complexity using fuzzy DANP: Case study of international development projects. Engineering, Construction and Architectural Management, 28(4), pp. 1114-1133. ISSN 0969-9988
Kim, T; Lim, H; Cho, H and Kang, K I (2014) Automated lifting system integrated with construction hoists for table formwork in tall buildings. Journal of Construction Engineering and Management, 140(10): 04014049, ISSN 0733-9364
Kim, Y; Kim, K and Shin, D (2005) Delay analysis method using delay section. Journal of Construction Engineering and Management, 131(11), pp. 1155-1164. ISSN 0733-9364
Kiomjian, D; Srour, I and Srour, F J (2020) Knowledge sharing and productivity improvement: An agent-based modeling approach. Journal of Construction Engineering and Management, 146(7): 04020076, ISSN 0733-9364
Kipling, J; Newton, R and Ormerod, M (2011) Accessing emergency rest centres in the UK: Lessons learnt. International Journal of Disaster Resilience in the Built Environment, 2(1), pp. 47-58. ISSN 1759-5916
Kirby, A M; Dietz, J E; Matson, E T; Pekny, J F and Wojtalewicz, C (2015) Major city evacuation planning using simulation modeling. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 397-408. ISSN 1759-5916
Kishk, M a U C (2008) The impact of effective risk management on project success. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Kittinaraporn, W; Tuprakay, S and Prasittisopin, L (2022) Effective modeling for construction activities of recycled aggregate concrete using artificial neural network. Journal of Construction Engineering and Management, 148(3): 04021206, ISSN 0733-9364
Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.
Klanšek, U (2016) Mixed-integer nonlinear programming model for nonlinear discrete optimization of project schedules under restricted costs. Journal of Construction Engineering and Management, 142(3): 04015088, ISSN 0733-9364
Knight, A and Watson, P (1999) The role of self and peer appraisal in construction education and its contribution to the concept of life long learning. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Knight, K and Fayek, A R (2002) Use of fuzzy logic for predicting design cost overruns on building projects. Journal of Construction Engineering and Management, 128(6), pp. 503-512. ISSN 0733-9364
Ko, C H and Cheng, M Y (2007) Dynamic prediction of project success using artificial intelligence. Journal of Construction Engineering and Management, 133(4), pp. 316-324. ISSN 0733-9364
Koch, C (2012) Contested overruns and performance of offshore wind power plants. Construction Management and Economics, 30(8), pp. 609-622. ISSN 1466433X
Koch, C and Bendixen, M (2005) Multiple perspectives on organizing: Projects between tyranny and perforation. Building Research & Information, 33(6), pp. 536-546. ISSN 0961-3218
Koch, C and Haugen, T I (2004) An it R&D-programme without new code?! State driven it development in Denmark. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Koch, C and Jensen, J S (2007) Systemic innovation in construction: The case of a Danish state development program. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Koch, C; Pedersen, T A and Fredslund, L (2024) Platforms of second-hand building material: A hub in the circular economy or fantasies of entrepreneurs? In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Kodikara, G W; Thorpe, A and McCaffer, R (1993) The use of bills of quantities in building contractor organizations. Construction Management and Economics, 11(4), pp. 261-269. ISSN 01446193
Koehn, E (1975) Probabilistic system for project management. PhD thesis, Wayne State University, USA.
Koehn, E and Caplan, S B (1987) Work improvement data for small and medium size contractors. Journal of Construction Engineering and Management, 113(2), pp. 327-339. ISSN 0733-9364
Koekemoer, V and Smallwood, J (2007) Information technology (it) in the construction process. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Kokkaew, N (2010) Risk flexibility analysis in infrastructure project finance. PhD thesis, Columbia University, USA.
Kokkaew, N and Chiara, N (2010) Modelling completion risk using stochastic critical path-envelope method: A BOT highway project application. Construction Management and Economics, 28(12), pp. 1239-1254. ISSN 1466433X
Kokkonen, A and Alin, P (2015) Practice-based learning in construction projects: A literature review. Construction Management and Economics, 33(7), pp. 513-530. ISSN 01446193
Kolar, Duro (2017) Improving the link between project management and strategy to optimise project success. PhD thesis, RMIT University, Australia.
Kometa, S T; Olomolaiye, P O and Harris, F C (1994) Attributes of UK construction clients influencing project consultants' performance. Construction Management and Economics, 12(5), pp. 433-443. ISSN 01446193
Kometa, S T; Olomolaiye, P O and Harris, F C (1995) An evaluation of clients' needs and responsibilities in the construction process. Engineering, Construction and Architectural Management, 2(1), pp. 57-76. ISSN 0969-9988
Kone, V. and Mahesh, G. (2026) The iprok ontology: A unified approach to managing construction project information. International Journal of Construction Management, 26(8), pp. 1599-1628. ISSN 1562-3599
Kong, F and Dou, D (2020) RCPSP with combined precedence relations and resource calendars. Journal of Construction Engineering and Management, 146(12): 04020133, ISSN 0733-9364
Kong, F and Dou, D (2021) Resource-constrained project scheduling problem under multiple time constraints. Journal of Construction Engineering and Management, 147(2): 04020170, ISSN 0733-9364
Kong, F; Guo, J and Lv, X (2021) Project resource input optimization problem with combined time constraints based on node network diagram and constraint programming. Journal of Construction Engineering and Management, 147(12): 2192, ISSN 0733-9364
Konior, J and Szóstak, M (2023) Course of planned, actual and earned cost curves of diverse construction investments. International Journal of Construction Management, 23(5), pp. 865-876. ISSN 1562-3599
Koo, B (2004) Formalizing construction sequence constraints for the rapid generation of scheduling alternatives. PhD thesis, Stanford University, USA.
Koo, B and Fischer, M (2000) Feasibility study of 4D CAD in commercial construction. Journal of Construction Engineering and Management, 126(4), pp. 251-260. ISSN 0733-9364
Koo, D H and Ariaratnam, S T (2008) Application of a sustainability model for assessing water main replacement options. Journal of Construction Engineering and Management, 134(8), pp. 563-574. ISSN 0733-9364
Koo, H J; O’Connor, J and Sprouse, R (2024) Analyzing the characteristics of design defect leading indicators on building construction projects. International Journal of Construction Management, 24(8), pp. 834-842. ISSN 1562-3599
Koo, K-J (2000) Organizational program management for multiple maintenance projects under multi-trade capacity constraints. PhD thesis, University of Wisconsin - Madison, USA.
Koolwijk, J; van Oel, C; Vrijhoef, R and Wamelink, J W F (2015) Partnering in construction: A field study to further develop the framework of supply chain integration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Korczynski, M (1993) Capital, labour and economic performance in the engineering construction industry: 1960-1990. PhD thesis, University of Warwick, UK.
Koseoglu, O; Sakin, M and Arayici, Y (2018) Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project. Engineering, Construction and Architectural Management, 25(10), pp. 1339-1354. ISSN 0969-9988
Kotey, S and T, S (2026) Exploring apprentice selection by skilled trade artisans in the Ghanaian construction industry. Construction Innovation, 26(2), pp. 579-606. ISSN 1471-4175
Kothapally, P R; Gbadamosi, A Q; Delgado, J M D and Mahamadu, A M (2023) An implementation strategy for the application of digital twin for construction progress monitoring using wearable technologies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Koulinas, G K and Anagnostopoulos, K P (2012) Construction resource allocation and leveling using a threshold accepting-based hyperheuristic algorithm. Journal of Construction Engineering and Management, 138(7), pp. 854-863. ISSN 0733-9364
Koushki, P A; Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294. ISSN 01446193
Koushki, P A and Kartam, N (2004) Impact of construction materials on project time and cost in Kuwait. Engineering, Construction and Architectural Management, 11(2), pp. 126-132. ISSN 0969-9988
Kowaltowski, D C C K; Muianga, E A D; Granja, A D; Moreira, D D C; Bernardini, S P and Castro, M R (2019) A critical analysis of research of a mass-housing programme. Building Research & Information, 47(6), pp. 716-733. ISSN 0961-3218
Kraatz, J A and Hampson, K D (2013) Brokering innovation to better leverage R&D investment. Building Research & Information, 41(2), pp. 187-197. ISSN 0961-3218
Kraidi, Layth (2020) Development of an integrated risk management framework for oil and gas pipeline projects. PhD thesis, Liverpool John Moores University, UK.
Kraiem, Z M and Diekmann, J E (1987) Concurrent delays in construction projects. Journal of Construction Engineering and Management, 113(4), pp. 591-602. ISSN 0733-9364
Kreitl, G and Oberndorfer, W J (2004) Motives for acquisitions among engineering consulting firms. Construction Management and Economics, 22(7), pp. 691-700. ISSN 01446193
Krima, N (2009) Assessing the effectiveness of Libyan supervisors in dealing with construction delays. PhD thesis, University of Salford, UK.
Krone, S J (1991) Decreasing the impact of changes. DSc thesis, George Washington University, USA.
Kuitert, L; Volker, L and Hermans, M H (2017) Public commissioning in a new era: Public value interests of construction clients. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kuittinen, M (2016) Does the use of recycled concrete lower the carbon footprint in humanitarian construction? International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 472-488. ISSN 1759-5916
Kukoyi, P O and Smallwood, J J (2017) A qualitative study of health and safety construction practices in Lagos. Journal of Construction Business and Management, 1(1), pp. 1-7. ISSN 2521-0165
Kulshrestha, M (1997) Total Value Control in Construction through Multiple Criteria Decision Making (MCDM). PhD thesis, Indian Institute of Technology Delhi, India.
Kumar, R; Chandrashekhar, I K and Singh, S P (2017) Quantification of construction project risks by analysis of past dispute cases. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kumar, S; Dhingra, A and Singh, B (2018) Lean-kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), pp. 143-160.
Kumar, V S S (1993) Application of fuzzy set theory in construction management. PhD thesis, Indian Institute of Technology Delhi, India.
Kumaraswamy, M M (1998) Industry development through creative project packaging and integrated management. Engineering, Construction and Architectural Management, 5(3), pp. 228-237. ISSN 0969-9988
Kumaraswamy, M M and Chan, D W M (1995) Determinants of construction duration. Construction Management and Economics, 13(3), pp. 209-217. ISSN 01446193
Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(1), pp. 17-29. ISSN 01446193
Kumaraswamy, M M and Chan, D W M (1999) Factors facilitating faster construction. Journal of Construction Procurement, 5(2), pp. 88-98. ISSN 1358-9180
Kumaraswamy, M M; Chan, D W M; Dissanayaka, S M and Yogeswaran, K (1997) Mapping methodologies and mixing methods in construction management research. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Kuo, S-F (1995) Decision support for irrigated project planning using a genetic algorithm. PhD thesis, Utah State University, USA.
Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.
Kuoribo, E; Yomoah, R; Owusu-Manu, D G; Acheampong, A; John Edwards, D and Debrah, C (2023) Assessing the interactive effects of the ethics of construction professionals on project performance in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 30(10), pp. 5233-5252. ISSN 0969-9988
Kurul, E (2003) Re-using listed buildings through conversion: A process mapping approach. PhD thesis, University College London, UK.
Kus, R H and Nygren, K (2002) Microenvironmental characterization of rendered autoclaved aerated concrete. Building Research & Information, 30(1), pp. 25-34. ISSN 0961-3218
Kuttantharappel Soman, R (2020) Automated look-ahead schedule generation using linked-data based constraint checking for construction projects. PhD thesis, Imperial College London, UK.
Kwafo, D G (2021) Strategies for improving performance of project managers in Ghana to reduce delays. PhD thesis, Walden University, USA.
Kwofie, T E; Adinyira, E and Botchway, E A (2015) Identification of the critical project management competencies of architects in the Ghanaian construction industry. International Journal of Construction Management, 15(4), pp. 288-298. ISSN 1562-3599
Kwofie, T E; Aigbavboa, C and Baiden-Amissah, A (2020) Ontology of the communication performance prospects of building information modelling adoption among project teams in construction project delivery. Journal of Construction in Developing Countries, 25(1), pp. 21-43. ISSN 1823-6499
Kwofie, T E; Aigbavboa, C O and Machethe, S O (2019) Nature of communication performance in non-traditional procurements in South Africa. Engineering, Construction and Architectural Management, 26(10), pp. 2264-2288. ISSN 0969-9988
Kwofie, T E; Amos-Abanyie, S and Afram, S O (2016) Principal component analysis of professional competencies of architects in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 23(5), pp. 571-587. ISSN 0969-9988
Kwofie, T E; Botchway, E A and Amos-Abanyie, S (2018) Examining the performance level of project management competencies of architects in Ghana using gap analysis approach. Journal of Construction in Developing Countries, 23(1), pp. 125-147. ISSN 1823-6499
Kwofie, T E; Ohis Aigbavboa, C and Thwala, W D (2019) Communication performance challenges in PPP projects: Cases of Ghana and South Africa. Built Environment Project and Asset Management, 9(5), pp. 628-641. ISSN 2044-124X
Kwok, T W; Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for hong kong's high-rise residential buildings: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(2), pp. 526-543. ISSN 0969-9988
Kwok, T W; Chang, S and Li, H (2025) Understanding client satisfaction of prefabricated curtain wall in Hong Kong using xgboost and Pearson correlation. Engineering, Construction and Architectural Management, 32(2), pp. 1254-1277. ISSN 0969-9988
Kwon, N; Park, M; Lee, H S; Ahn, J and Kim, S (2017) Construction noise prediction model based on case-based reasoning in the preconstruction phase. Journal of Construction Engineering and Management, 143(6): 04017008, ISSN 0733-9364
Kähkönen, K E E (1993) Modelling activity dependencies for building construction project scheduling. PhD thesis, University of Reading, UK.
Känsälä, K; Rantala, S; Kauppila, O and Leviäkangas, P (2018) Acceleration sensor technology for rail track asset condition monitoring. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 32-40. ISSN 17514304
Lagerkvist, Johan (2025) A design approach for cost effective, climate smart and buildable bridges. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Lagos, C I; Herrera, R F and Alarcón, L F (2019) Assessing the impacts of an IT LPS support system on schedule accomplishment in construction projects. Journal of Construction Engineering and Management, 145(10): 04019055, ISSN 0733-9364
Lahdenperä, P (1999) Restructuring the building industry for improved performance. Journal of Construction Procurement, 5(2), pp. 118-128. ISSN 1358-9180
Lahdenperä, P (2017) Towards a coherent theory of project alliancing: Discovering the system's complex mechanisms yielding value for money. Construction Economics and Building, 17(2), pp. 41-61. ISSN 2204-9029
Lahouti, A (2017) Cue-based decision-making in construction work crews: An agent-based modeling approach. PhD thesis, Michigan State University, USA.
Laishram, B and Sood, R (2024) Challenges in implementation of 7D-BIM for infrastructure asset management: A systematic review. Construction Economics and Building, 24(3), pp. 95-117. ISSN 2204-9029
Laishram, B S and Kalidindi, S N (2009) Desirability rating analysis for debt financing of public-private partnership road projects. Construction Management and Economics, 27(9), pp. 823-837. ISSN 1466433X
Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.
Lal, H (2013) Nuclear decommissioning contracts: The legal and commercial issues. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 94-102. ISSN 17514304
Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193
Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(2), pp. 84-95. ISSN 0961-3218
Lam, P T I and Wong, F W H (2009) Improving building project performance: How buildability benchmarking can help. Construction Management and Economics, 27(1), pp. 41-52. ISSN 1466433X
Lam, S-W (2001) Construction safety education in Hong Kong. PhD thesis, International University of Fundamental Studies, Russia.
Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387
Lam, Y T (1995) A knowledge-based system for planning and scheduling ready-mixed concrete. PhD thesis, Loughborough University, UK.
Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.
Lamb, S and Kwok, K C S (2017) Sopite syndrome in wind-excited buildings: Productivity and wellbeing impacts. Building Research & Information, 45(3), pp. 347-358. ISSN 0961-3218
Lambers, R; Lamari, F; Skitmore, M and Rajendra, D (2024) Key residential construction defects: A framework for their identification and correlated causes. Construction Innovation, 24(6), pp. 1425-1459. ISSN 1471-4175
Lan, R; Adenuga, O and Awolusi, I (2025) Impact of construction project failure on key project stakeholders: Assessing the perspectives of professionals in Lagos metropolis. Construction Economics and Building, 25(3-4), pp. 90-120. ISSN 2204-9029
Lang, R; Goodier, C and Glass, J (2016) Are housebuilders' production strategies a barrier to offsite construction uptake in the UK? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Langston, C and Crowley, C (2021) Evaluation of transportation infrastructure: A case study of Gold Coast Light Rail stage 1&2. Construction Economics and Building, 21(4), pp. 1-20. ISSN 2204-9029
Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.
Larkin, K; Odeyinka, H and Eadie, R (2012) An exploration of theoretical concepts and methods for assessing risk impacts on the variability between contract sum and final account in design and build projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Laroza, F A R (2025) Investigating construction delays in cold storage projects in the Philippines. International Journal of Construction Management, 25(6), pp. 661-671. ISSN 1562-3599
Larsson, J; Eriksson, P E; Olofsson, T and Simonsson, P (2014) Industrialized construction in the Swedish infrastructure sector: Core elements and barriers. Construction Management and Economics, 32(1-2), pp. 83-96. ISSN 01446193
Larsson, N and Clark, J (2000) Incremental costs within the design process for energy efficient buildings. Building Research & Information, 28(5-6), pp. 413-418. ISSN 0961-3218
Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.
Larsson, R and Rudberg, M (2019) Impact of weather conditions on in situ concrete wall operations using a simulation-based approach. Journal of Construction Engineering and Management, 145(7): 05019009, ISSN 0733-9364
Laryea, S (2009) Subcontract and supply enquiries in the tender process of contractors. Construction Management and Economics, 27(12), pp. 1219-1230. ISSN 1466433X
Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(9), pp. 2060-2083. ISSN 0969-9988
Laryea, S and Hughes, W (2009) How contractors in Ghana include risk in their bid prices. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Laryea, S and Watermeyer, R B (2018) Comparison of two infrastructure project implementation models in a developing country. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 3-17. ISSN 17514304
Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193
Lather, J I (2019) A hybrid modeling approach using discrete event simulation and layout optimization for healthcare layout planning problems. PhD thesis, Pennsylvania State University, USA.
Lau, C H; Mesthrige, J W; Lam, P T I and Javed, A A (2019) The challenges of adopting new engineering contract: A Hong Kong study. Engineering, Construction and Architectural Management, 26(10), pp. 2389-2409. ISSN 0969-9988
Laufer, A (1992) A micro view of the project planning process. Construction Management and Economics, 10(1), pp. 31-43. ISSN 01446193
Laufer, A; Shapira, A; Cohenca-Zall, D and Howell, G A (1993) Prebid and preconstruction planning process. Journal of Construction Engineering and Management, 119(3), pp. 426-444. ISSN 0733-9364
Laufer, A; Shapira, A and Goren, I (1998) Implementing an integrative approach to project schedule compression. Engineering, Construction and Architectural Management, 5(1), pp. 82-92. ISSN 0969-9988
Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599
Laurell-Stenlund, K (2010) Value creation in development and construction of public buildings: The case of houses of culture. PhD thesis, Luleå University of Technology, Sweden.
Lawal, H S; Ahmadu, H A; Abdullahi, M; Yamusa, M A and Abdulrazaq, M (2023) Modeling duration of building renovation projects. Journal of Financial Management of Property and Construction, 28(3), pp. 423-438. ISSN 1366-4387
Lawani, K; Hare, B; Tong, M and Cameron, I (2025) Exploring mental health challenges and implications for construction safety. Journal of Engineering, Design and Technology, 23(4), pp. 1062-1086. ISSN 1726-0531
Lawani, K; Sadeghineko, F; Tong, M and Bayraktar, M (2025) Methodology for retrospectively developing a BIM model from point cloud scans using ongoing building project as case study. Journal of Engineering, Design and Technology, 23(4), pp. 1243-1261. ISSN 1726-0531
Le, A T H; Domingo, N; Rasheed, E and Park, K (2022) Maturity model of building maintenance management for New Zealand's state schools. Building Research & Information, 50(4), pp. 438-451. ISSN 0961-3218
Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364
Le, T (2009) Improving right-of-way acquisition in highway projects through scope definition and management of inherent factors. PhD thesis, University of Texas at Austin, USA.
Le Roux, G and Nkado, R N (2001) Legislation governing continuing professional development in the built environment professions in South Africa. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Leandro, R; O'Connor, J T and Khwaja, N (2018) Development and application of a production-rate resource for contract time determination. Journal of Construction Engineering and Management, 144(12): 06018005, ISSN 0733-9364
Leathem, T and Burt, R (2024) Leveraging qualitative analysis software to complement traditional qualitative research approaches for curriculum design: Results of a needs assessment study. International Journal of Construction Education and Research, 20(4), pp. 544-561. ISSN 1557-8771
Leather, P and Rolfe, S J (1997) Fit for the task: The future of the small scale domestic repair and maintenance industry in the UK. Construction Management and Economics, 15(2), pp. 201-212. ISSN 01446193
Leblanc, H; Thomson, C; Cameron, I and Nitithamyong, P (2013) Developing a planned work process model for housing associations. Engineering, Construction and Architectural Management, 20(3), pp. 232-249. ISSN 0969-9988
Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304
Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(4), pp. 1679-1696. ISSN 0969-9988
Lee, D; Nie, G Y and Han, K (2024) Automatic and real-time joint tracking and three-dimensional scanning for a construction welding robot. Journal of Construction Engineering and Management, 150(3): 04023165, ISSN 0733-9364
Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364
Lee, D E and Arditi, D (2006) Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), pp. 268-277. ISSN 0733-9364
Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364
Lee, E B (2000) Constructability and productivity analysis for long life pavement rehabilitation strategies (LLPRS). PhD thesis, University of California, Berkeley, USA.
Lee, E B; Harvey, J T and Thomas, D (2005) Integrated design/construction/operations analysis for fast-track urban freeway reconstruction. Journal of Construction Engineering and Management, 131(12), pp. 1283-1291. ISSN 0733-9364
Lee, E B and Ibbs, C W (2005) Computer simulation model: Construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering and Management, 131(4), pp. 449-458. ISSN 0733-9364
Lee, E B; Lee, H and Harvey, J T (2006) Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study. Journal of Construction Engineering and Management, 132(5), pp. 465-472. ISSN 0733-9364
Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364
Lee, H S; Ryu, H G; Yu, J H and Kim, J J (2005) Method for calculating schedule delay considering lost productivity. Journal of Construction Engineering and Management, 131(11), pp. 1147-1154. ISSN 0733-9364
Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364
Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364
Lee, J (2008) Dynamic project management methodology: Managing schedule compression. PhD thesis, University of Florida, USA.
Lee, J; Blumenstein, M; Guan, H and Loo, Y C (2013) Minimising uncertainty in long-term prediction of bridge element. Engineering, Construction and Architectural Management, 20(2), pp. 127-142. ISSN 0969-9988
Lee, J and Hyun, H (2019) Multiple modular building construction project scheduling using genetic algorithms. Journal of Construction Engineering and Management, 145(1): 04018116, ISSN 0733-9364
Lee, J; Park, M; Lee, H S and Hyun, H (2019) Classification of modular building construction projects based on schedule-driven approach. Journal of Construction Engineering and Management, 145(5): 04019031, ISSN 0733-9364
Lee, S (2000) Spatial model and decentralized path planning for construction automation. PhD thesis, University of Wisconsin - Madison, USA.
Lee, S; Peña-Mora, F and Park, M (2005) Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, 131(8), pp. 890-902. ISSN 0733-9364
Lee, S; Peña-Mora, F and Park, M (2006) Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects. Journal of Construction Engineering and Management, 132(5), pp. 452-464. ISSN 0733-9364
Lee, S H (2009) Computational fieldwork support for efficient operation and maintenance of mechanical, electrical and plumbing systems. PhD thesis, Carnegie Mellon University, USA.
Lee, S H; Thomas, S R and Tucker, R L (2004) Effective practice utilization using performance prediction software. Journal of Construction Engineering and Management, 130(4), pp. 576-585. ISSN 0733-9364
Lee, S H; Thomas, S R and Tucker, R L (2005) The relative impacts of selected practices on project cost and schedule. Construction Management and Economics, 23(5), pp. 545-553. ISSN 01446193
Lee, S-H (2001) Discriminant function analysis for categorization of best practices. PhD thesis, University of Texas at Austin, USA.
Lee, S-H (2012) Management of building energy consumption and energy supply network on campus scale. PhD thesis, Georgia Institute of Technology, USA.
Lee, W V and Steemers, K (2017) Exposure duration in overheating assessments: A retrofit modelling study. Building Research & Information, 45(1-2), pp. 60-82. ISSN 0961-3218
Lee, Y (2020) A methodology to align the logistical requirements of prefabricated wall panels. PhD thesis, Stanford University, USA.
Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.
Legard, D A (1983) Probabilistic analysis of an idealized model of construction projects. Construction Management and Economics, 1(1), pp. 31-45. ISSN 01446193
Legeby, A and Pech, C (2023) Social values and social infrastructures: A multi-perspective approach to place. Buildings & Cities, 4(1), pp. 801-816. ISSN 2632-6655
Legesse, A; Nejat, A and Ghebrab, T (2025) The coupling of project delivery methods and contract strategies for public building projects in Ethiopia. Construction Innovation, 25(2), pp. 400-418. ISSN 1471-4175
Lei, Z; Han, S; Bouferguène, A; Taghaddos, H; Hermann, U and Al-Hussein, M (2015) Algorithm for mobile crane walking path planning in congested industrial plants. Journal of Construction Engineering and Management, 141(2): 05014016, ISSN 0733-9364
Lei, Zhen (2015) Automated simulation model for crane motion planning in heavy industrial projects. PhD thesis, University of Alberta, Canada.
Leistner, S; Honold, C; Maierhofer, M; Haase, W; Blandini, L; Sobek, W; Roth, D; Binz, H and Menges, A (2022) Research on integral design and planning processes for adaptive buildings. Architectural Engineering and Design Management, 18(3), pp. 241-260. ISSN 1745-2007
Lekan, A; Aigbavboa, C and Emetere, M (2023) Managing quality control systems in intelligence production and manufacturing in contemporary time. International Journal of Construction Management, 23(8), pp. 1436-1446. ISSN 1562-3599
Lema, N M (1996) Construction labour productivity analysis and benchmarking: the case of Tanzania. PhD thesis, Loughborough University, UK.
Leo-Olagbaye, F and Odeyinka, H A (2020) An assessment of risk impact on road projects in Osun State, Nigeria. Built Environment Project and Asset Management, 10(5), pp. 673-691. ISSN 2044-124X
Leontaris, G (2021) Decision making under uncertainty for construction management of offshore wind assets. PhD thesis, Delft University of Technology, Netherlands.
Lerche, J; Enevoldsen, P and Seppänen, O (2022) Application of takt and kanban to modular wind turbine construction. Journal of Construction Engineering and Management, 148(2), ISSN 0733-9364
Lerche, J; Neve, H H; Ballard, G; Teizer, J; Wandahl, S and Gross, A (2020) Application of last planner system to modular offshore wind construction. Journal of Construction Engineering and Management, 146(11): 05020015, ISSN 0733-9364
Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.
Lester, D and Torero, J (2019) Using megaproject performance outcomes to enhance decision-making behaviors in civil engineering graduates. Construction Economics and Building, 19(1), pp. 96-110. ISSN 2204-9029
Lester, E (2022) An exploration of mentorship as a resource for knowledge sharing in the built environment. PhD thesis, University of Salford, UK.
Leu, S S; Huang, K J; Hung, C C W and Wu, P L (2024) Revolutionizing steel building project cost overrun risk assessment by Bayesian network. Engineering, Construction and Architectural Management, 31(12), pp. 4975-4987. ISSN 0969-9988
Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193
Leu, S S and Hwang, S T (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, 127(4), pp. 270-280. ISSN 0733-9364
Leu, S S and Lin, Y C (2008) Project performance evaluation based on statistical process control techniques. Journal of Construction Engineering and Management, 134(10), pp. 813-819. ISSN 0733-9364
Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364
Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193
Levitt, R E; Kartam, N A and Kunz, J C (1988) Artificial intelligence techniques for generating construction project plans. Journal of Construction Engineering and Management, 114(3), pp. 329-343. ISSN 0733-9364
Lewis, T M (1984) A review of the causes of recent problems in the construction industry of Trinidad and Tobago. Construction Management and Economics, 2(1), pp. 37-48. ISSN 01446193
Lewis, T M (2004) The construction industry in the economy of Trinidad and Tobago. Construction Management and Economics, 22(5), pp. 541-549. ISSN 01446193
Li, F.; Chi, H. L.; Li, R.; Zou, Z. and Wang, R. D. (2026) Two-stage optimization design framework for tower crane layout planning in modular integrated construction considering transportation efficiency, operator visibility, and lifting safety. Journal of Construction Engineering and Management, 152(6): 04026080, ISSN 0733-9364
Li, J.; Chen, Z.; Li, Z.; Kong, L. and Zhang, H. (2026) Integrating computer vision and audio signals for concrete vibration activity recognition and assessment. Journal of Construction Engineering and Management, 152(7): 04026099, ISSN 0733-9364
Li, T.; Ling, F. Y. Y.; Li, Z.; Dou, Y. and Guo, Z. (2026) Portfolio optimization of prefabricated interior building component systems: A multistakeholder perspective. Journal of Construction Engineering and Management, 152(9): 04026154, ISSN 0733-9364
Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364
Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.
Li, B; Akintoye, A and Hardcastle, C (2000) Conceptual framework for construction public private partnerships. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Li, D; Li, X; Feng, H; Wang, Y and Fan, S (2022) ISM-based relationship among critical factors that affect the choice of prefabricated concrete buildings in China. International Journal of Construction Management, 22(6), pp. 977-992. ISSN 1562-3599
Li, D and Lu, M (2017) Automated generation of work breakdown structure and project network model for earthworks project planning: A flow network-based optimization approach. Journal of Construction Engineering and Management, 143(1): 04016086, ISSN 0733-9364
Li, H; Chan, G and Skitmore, M (2013) Integrating real time positioning systems to improve blind lifting and loading crane operations. Construction Management and Economics, 31(6), pp. 596-605. ISSN 1466433X
Li, H; Chan, G; Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(5), pp. 536-550. ISSN 0969-9988
Li, H; Guo, H L; Skitmore, M; Huang, T; Chan, K Y N and Chan, G (2011) Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong. Construction Management and Economics, 29(3), pp. 233-245. ISSN 01446193
Li, H and Love, P (1997) Using improved genetic algorithms to facilitate time-cost optimization. Journal of Construction Engineering and Management, 123(3), pp. 233-237. ISSN 0733-9364
Li, H; Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(3), pp. 211-220. ISSN 0969-9988
Li, H; Wang, M and Dong, X (2019) Resource leveling in projects with stochastic minimum time lags. Journal of Construction Engineering and Management, 145(4): 04019015, ISSN 0733-9364
Li, H; Xu, Z and Demeulemeester, E (2015) Scheduling policies for the stochastic resource leveling problem. Journal of Construction Engineering and Management, 141(2): 04014072, ISSN 0733-9364
Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.
Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364
Li, J; Moselhi, O and Alkass, S (2006) Forecasting project status by using fuzzy logic. Journal of Construction Engineering and Management, 132(11), pp. 1193-1202. ISSN 0733-9364
Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364
Li, M G; Chen, J J; Xu, A J; Xia, X H and Wang, J H (2014) Case study of innovative top-down construction method with channel-type excavation. Journal of Construction Engineering and Management, 140(5): 05014003, ISSN 0733-9364
Li, Q (2012) Inter-organizational relationships in the programme management lifecycle. PhD thesis, University of Leeds, UK.
Li, Q; Jiang, M; Tao, S; Hao, J and Chong, H Y (2023) The integrated problem of construction project scheduling and multiskilled staff assignment with learning effect. Journal of Construction Engineering and Management, 149(8): 04023064, ISSN 0733-9364
Li, Q; Sun, Q; Tao, S and Gao, X (2020) Multi-skill project scheduling with skill evolution and cooperation effectiveness. Engineering, Construction and Architectural Management, 27(8), pp. 2023-2045. ISSN 0969-9988
Li, R and Roberti, R (2017) Optimal scheduling of railway track possessions in large-scale projects with multiple construction works. Journal of Construction Engineering and Management, 143(6): 04017007, ISSN 0733-9364
Li, S (1998) An investigation of the build operate transfer approach for infrastucture works in the People's Republic of China. PhD thesis, University of Reading, UK.
Li, S (2018) Knowledge domains and skills that facilitate knowledge sharing in project management: a case study in the Chinese construction industry. PhD thesis, University of Sheffield, UK.
Li, W (1995) Benefit and cost analysis: Three-dimensional computer models with integrated databases in the management of construction. PhD thesis, Columbia University, USA.
Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.
Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X
Li, Y (2023) Integrated multi-stage decision-support for enhanced infrastructure restoration under uncertainty. PhD thesis, George Mason University, USA.
Li, Y; Lu, Y; Li, D and Ma, L (2015) Metanetwork analysis for project task assignment. Journal of Construction Engineering and Management, 141(12): 04015044, ISSN 0733-9364
Li, Y and Taylor, T R B (2014) Modeling the impact of design rework on transportation infrastructure construction project performance. Journal of Construction Engineering and Management, 140(9): 04014044, ISSN 0733-9364
Li, Y; Zhang, L; Liu, X and Li, X (2025) A project scheduling optimization model for reducing construction dust emissions based on variability in meteorological conditions. Journal of Construction Engineering and Management, 151(11): 04025171, ISSN 0733-9364
Li, Z; Zhang, Q; Fan, F and Shen, S (2020) Analysis of dynamic properties and vibration comfort of large-scale stands. Building Research & Information, 48(7), pp. 802-816. ISSN 0961-3218
Lian, J K M; Foo, Z Y and Ling, F Y Y (2018) Value of internships for professional careers in the built environment sector in Singapore. Engineering, Construction and Architectural Management, 25(1), pp. 77-89. ISSN 0969-9988
Liang, D; Song, L and Branham, T (2011) A task-based safety model for construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 29-40. ISSN 17514312
Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364
Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364
Liao, L; Gan, C; Yang, J and Liang, Y (2025) Impacts of safety capacity and personalized safety training on construction workers' hazard recognition using eye-tracking technology. Journal of Construction Engineering and Management, 151(6): 04025050, ISSN 0733-9364
Liao, L; Teo, E A L and Low, S P (2017) A project management framework for enhanced productivity performance using building information modelling. Construction Economics and Building, 17(3), pp. 1-26. ISSN 2204-9029
Liberatore, M J; Pollack-Johnson, B and Smith, C A (2001) Project management in construction: Software use and research directions. Journal of Construction Engineering and Management, 127(2), pp. 101-107. ISSN 0733-9364
Lim, E C (1996) The analysis of productivity in building construction. PhD thesis, Loughborough University, UK.
Lim, J N; Schultmann, F and Ofori, G (2010) Tailoring competitive advantages derived from innovation to the needs of construction firms. Journal of Construction Engineering and Management, 136(5), pp. 568-580. ISSN 0733-9364
Lim, T K; Park, S M; Lee, H C and Lee, D E (2016) Artificial neural network-based slip-trip classifier using smart sensor for construction workplace. Journal of Construction Engineering and Management, 142(2): 04015065, ISSN 0733-9364
Lin, J J and Golparvar-Fard, M (2021) Visual and virtual production management system for proactive project controls. Journal of Construction Engineering and Management, 147(7): 2045, ISSN 0733-9364
Lin, K L and Haas, C T (1996) An interactive planning environment for critical operations. Journal of Construction Engineering and Management, 122(3), pp. 212-230. ISSN 0733-9364
Lin, K L and Haas, C T (1996) Multiple heavy lifts optimization. Journal of Construction Engineering and Management, 122(4), pp. 354-362. ISSN 0733-9364
Lin, K-L (1995) Planning for critical construction operations involving large semi-stationary equipment. PhD thesis, University of Texas at Austin, USA.
Lin, S and Cheung, S O (2022) Intention to settle as an indispensable element of negotiated construction dispute settlement. Journal of Construction Engineering and Management, 148(10): 04022113, ISSN 0733-9364
Lin, S L (2021) Environmental risk and delay analysis: Lessons learned from the california high speed rail project. DEnv thesis, University of California, Los Angeles, USA.
Lin, Solomon Tung Kit (2021) Brim-based structural life cycle assessment of bridges: Incorporating finite element analysis and real-time sensor measurements. PhD thesis, Monash University, Australia.
Lindhard, S (2014) Understanding the effect of variation in a production system. Journal of Construction Engineering and Management, 140(11): 4014051, ISSN 0733-9364
Lindhard, S and Wandahl, S (2014) Exploration of the reasons for delays in construction. International Journal of Construction Management, 14(1), pp. 36-44. ISSN 1562-3599
Lindhard, S M; Hamzeh, F; Gonzalez, V A; Wandahl, S and Ussing, L F (2019) Impact of activity sequencing on reducing variability. Journal of Construction Engineering and Management, 145(3): 04019001, ISSN 0733-9364
Lindhard, S M; Neve, H; Terje Kalsaas, B; Møller, D E and Wandahl, S (2022) Ranking and comparing key factors causing time-overruns in on-site construction. International Journal of Construction Management, 22(14), pp. 2724-2730. ISSN 1562-3599
Lindén, S and Josephson, P E (2013) In-housing or out-sourcing on-site materials handling in housing? Journal of Engineering, Design and Technology, 11(1), pp. 90-106. ISSN 1726-0531
Lines, B (2014) Action research approach to implementation of APDMS within owner organizations strategic management and overcoming resistance to change in the AEC industry. PhD thesis, Arizona State University, USA.
Lines, B C; Kakarapalli, R and Nguyen, P H D (2022) Does best value procurement cost more than low-bid? A total project cost perspective. International Journal of Construction Education and Research, 18(1), pp. 85-100. ISSN 1557-8771
Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771
Ling, F Y Y (2018) International comparison of performance of public projects. Built Environment Project and Asset Management, 8(3), pp. 281-292. ISSN 2044-124X
Ling, F Y Y and Hien, M B T (2014) Boosting project outcomes through goal alignment: A case study of Vietnam. Construction Economics and Building, 14(2), pp. 73-86. ISSN 2204-9029
Ling, F Y Y; Ke, Y; Kumaraswamy, M M and Wang, S (2014) Key relational contracting practices affecting performance of public construction projects in China. Journal of Construction Engineering and Management, 140(1): 04013034, ISSN 0733-9364
Ling, F Y Y and Tran, P Q (2012) Effects of interpersonal relations on public sector construction contracts in Vietnam. Construction Management and Economics, 30(12), pp. 1087-1101. ISSN 1466433X
Lingard, H (2005) Balancing study and paid work: The experiences of construction undergraduates in an Australian university. Construction Economics and Building, 5(1), pp. 41-47. ISSN 2204-9029
Lingard, H; Brown, K; Bradley, L; Bailey, C and Townsend, K (2007) Improving employees' work-life balance in the construction industry: Project alliance case study. Journal of Construction Engineering and Management, 133(10), pp. 807-815. ISSN 0733-9364
Lingard, H; Francis, V and Turner, M (2012) Work time demands, work time control and supervisor support in the Australian construction industry: An analysis of work-family interaction. Engineering, Construction and Architectural Management, 19(6), pp. 647-665. ISSN 0969-9988
Lingard, H and Saunders, A (2004) Occupational rehabilitation in the construction industry of Victoria. Construction Management and Economics, 22(10), pp. 1091-1101. ISSN 01446193
Lingard, H and Turner, M (2015) Improving the health of male, blue collar construction workers: A social ecological perspective. Construction Management and Economics, 33(1), pp. 18-34. ISSN 01446193
Lingard, H and Turner, M (2017) Promoting construction workers' health: A multi-level system perspective. Construction Management and Economics, 35(5), pp. 239-253. ISSN 01446193
Lingard, H; Wakefield, R and Walker, D (2020) The client's role in promoting work health and safety in construction projects: Balancing contracts and relationships to effect change. Construction Management and Economics, 38(11), pp. 993-1008. ISSN 01446193
Lingard, H; Zhang, R P and Oswald, D (2019) Effect of leadership and communication practices on the safety climate and behaviour of construction workgroups. Engineering, Construction and Architectural Management, 26(6), pp. 886-906. ISSN 0969-9988
Lishner, I and Shtub, A (2023) The compounding effect of multiple disruptions on construction projects. International Journal of Construction Management, 23(6), pp. 1061-1068. ISSN 1562-3599
Lisk, D R (2014) Equal opportunities for women in construction trades: Issues of education, training and employment in northern Ireland. PhD thesis, Queen's University Belfast, UK.
Liu, J.; Chen, J.; Li, Y. and Zhao, K. (2026) Optimizing constrained construction crew-task assignment with grey wolf optimizer. Journal of Construction Engineering and Management, 152(8): 04026118, ISSN 0733-9364
Liu, A; Hodgson, G and Lord, W (2010) Innovation in construction education: The role of culture in e-learning. Architectural Engineering and Design Management, 6(2), pp. 91-102. ISSN 1745-2007
Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G and Zou, Y (2024) Understanding social interaction and physiological patterns in nonlean and Last Planner system-based project teams: A comparative study using immersive virtual reality. Journal of Construction Engineering and Management, 150(10): 04024131, ISSN 0733-9364
Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G; Zou, Y and Davies, R (2024) Integrating the last planner system and immersive virtual reality: Exploring the social mechanisms produced by using LPS in projects. Journal of Construction Engineering and Management, 150(7): 04024070, ISSN 0733-9364
Liu, C; González, V A; Lee, G; Davies, R; Cabrera-Guerrero, G and Zou, Y (2025) Assessing an immersive virtual reality-based simulation game capability to study the social mechanisms enabled by the Last Planner system in projects. Journal of Construction Engineering and Management, 151(9): 04025111, ISSN 0733-9364
Liu, D; Hu, C; Guo, S and Yu, J (2022) Z -number-based quantitative expression of activity information in uncertain project scheduling. Journal of Construction Engineering and Management, 148(9): 04022098, ISSN 0733-9364
Liu, D; Sun, J; Zhong, D and Song, L (2012) Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9), pp. 1085-1094. ISSN 0733-9364
Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X
Liu, J; Love, P E D; Smith, J; Regan, M and Palaneeswaran, E (2015) Review of performance measurement: Implications for public-private partnerships. Built Environment Project and Asset Management, 5(1), pp. 35-51. ISSN 2044-124X
Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364
Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364
Liu, J and Rahbar, F (2004) Project time-cost trade-off optimization by maximal flow theory. Journal of Construction Engineering and Management, 130(4), pp. 607-609. ISSN 0733-9364
Liu, J; Chen, J; Tian, J and Li, Y (2025) An efficient random key-based genetic algorithm for solving multimode resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 151(12): 04025193, ISSN 0733-9364
Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.
Liu, L; Burns, S A and Feng, C W (1995) Construction time-cost trade-off analysis using LP/IP hybrid method. Journal of Construction Engineering and Management, 121(4), pp. 446-454. ISSN 0733-9364
Liu, L-Y (1991) Coops: Construction object-oriented process simulation system. PhD thesis, University of Michigan, USA.
Liu, M (2007) Work flow variability and labor productivity loss for construction projects. PhD thesis, University of California, Berkeley, USA.
Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.
Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment. PhD thesis, University of Michigan, USA.
Liu, R (2021) Impact of enhanced context-awareness for construction field crews on task cycle time. PhD thesis, Stanford University, USA.
Liu, S S and Wang, C J (2009) Two-stage profit optimization model for linear scheduling problems considering cash flow. Construction Management and Economics, 27(11), pp. 1023-1037. ISSN 1466433X
Liu, S S and Wang, C J (2010) Profit optimization for multiproject scheduling problems considering cash flow. Journal of Construction Engineering and Management, 136(12), pp. 1268-1278. ISSN 0733-9364
Liu, T and Wilkinson, S (2011) Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation, 11(4), pp. 452-469. ISSN 1471-4175
Liu, W (2008) Systems theory based method for construction project planning. PhD thesis, University of Florida, USA.
Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364
Liu, W; Zhang, J; Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(6): 04024047, ISSN 0733-9364
Liu, Y; Jarvamardi, A; Zhang, Y; Liu, M; Hsiang, S M; Yang, S; Yu, X and Jiang, Z (2021) Comparative study on perception of causes for construction task delay in China and the United States. Journal of Construction Engineering and Management, 147(3): 04020176, ISSN 0733-9364
Liu, Y and Mohamed, Y (2012) Modelling industrial construction operations using a multi-agent resource allocation framework. Engineering, Construction and Architectural Management, 19(4), pp. 406-427. ISSN 0969-9988
Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y and Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4): 04025019, ISSN 0733-9364
Liu, Z; Wang, H and Li, H (2018) Model of equipment sharing between contractors on construction projects. Journal of Construction Engineering and Management, 144(6): 04018039, ISSN 0733-9364
Livingstone, N; Fiorentino, S and Short, M (2021) Planning for residential 'value'? London's densification policies and impacts. Buildings & Cities, 2(1), pp. 203-219. ISSN 2632-6655
Liyanage, C; Dias, N; Amaratunga, D and Haigh, R (2017) Current context of transport sector in south Asia: Recommendations towards a sustainable transportation system. Built Environment Project and Asset Management, 7(5), pp. 490-505. ISSN 2044-124X
Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(2), pp. 103-113. ISSN 1466433X
Lluch, J F (1981) Analysis of construction operations using microcomputers. PhD thesis, Georgia Institute of Technology, USA.
Lo, T Y; Fung, I W H and Tung, K C F (2006) Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management, 132(6), pp. 636-649. ISSN 0733-9364
Lo, Y; Zhang, C; Ye, Z and Cui, C (2023) Monitoring road base course construction progress by photogrammetry-based 3D reconstruction. International Journal of Construction Management, 23(12), pp. 2087-2101. ISSN 1562-3599
Loehlein, G (2000) Role of the reichsforschungsgesellschaft fuer wirtschaftlichkeit im bau - und wohnungswesen e.v in supporting non-traditional construction methods in German public housing in the late 1920s. PhD thesis, Cardiff University, UK.
Lombardi Filho, Pedro (2022) Management of small volumes of asbestos-cement materials in Brazil: From use to waste. PhD thesis, Universidade de São Paulo, Brazil.
London, K A and Cadman, K (2009) Impact of a fragmented regulatory environment on sustainable urban development design management. Architectural Engineering and Design Management, 5(1-2), pp. 5-23. ISSN 1745-2007
Long, G (2010) A detailed investigation of the applicability and utility of simulation and gaming in the teaching of civil engineering students. PhD thesis, University of Nottingham, UK.
Lonsdale, J H (2011) Falls from height: risk perception of ladder users within the UK construction industry. PhD thesis, Heriot-Watt University, UK.
Loosemore, M and Bridgeman, J (2017) Corporate volunteering in the construction industry: Motivations, costs and benefits. Construction Management and Economics, 35(10), pp. 641-653. ISSN 01446193
Loosemore, M and Bridgeman, J (2018) The social impact of construction industry schools-based corporate volunteering. Construction Management and Economics, 36(5), pp. 243-258. ISSN 01446193
Loosemore, M; Daniele, F and Lim, B T H (2020) Integrating ex-offenders into the Australian construction industry. Construction Management and Economics, 38(10), pp. 877-893. ISSN 01446193
Loosemore, M; Higgon, D and Osborne, J (2020) Managing new social procurement imperatives in the Australian construction industry. Engineering, Construction and Architectural Management, 27(10), pp. 3075-3093. ISSN 0969-9988
Loosemore, M and Richard, J (2015) Valuing innovation in construction and infrastructure: Getting clients past a lowest price mentality. Engineering, Construction and Architectural Management, 22(1), pp. 38-53. ISSN 0969-9988
Lopes, J (2002) Characteristics of the main institutional actors in the Portuguese construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Lopez, R; Chong, H Y; Wang, X and Graham, J (2016) Technical review: Analysis and appraisal of four-dimensional building information modeling usability in construction and engineering projects. Journal of Construction Engineering and Management, 142(5): 06015005, ISSN 0733-9364
Lordsleem Junior, Alberto Casado (2002) Methodology for subcontractor companies management capacitation. PhD thesis, Universidade de São Paulo, Brazil.
Lorterapong, P and Moselhi, O (1996) Project-network analysis using fuzzy sets theory. Journal of Construction Engineering and Management, 122(4), pp. 308-317. ISSN 0733-9364
Lorterapong, P and Ussavadilokrit, M (2013) Construction scheduling using the constraint satisfaction problem method. Journal of Construction Engineering and Management, 139(4), pp. 414-422. ISSN 0733-9364
Louis, J (2016) Simulation analysis, monitoring, and control of operations. PhD thesis, Purdue University, USA.
Love, P; Smith, J and Han, S (2011) Systemic rework risk classification for offshore projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.
Love, P E D (2002) Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 18-29. ISSN 0733-9364
Love, P E D; Davis, P; Kerry London, K and Jasper, T (2008) Causal modelling of construction disputes. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Love, P E D; Davis, P R; Lopez, R and Jasper, T (2008) It’s not just about bricks and mortar: Procedural failures in construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Love, P E D; Edwards, D J; Watson, H and Davis, P (2010) Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), pp. 275-282. ISSN 0733-9364
Love, P E D and Li, H (2000) Overcoming the problems associated with quality certification. Construction Management and Economics, 18(2), pp. 139-149. ISSN 01446193
Love, P E D; Manual, P and Li, H (1999) Determining the causal structure of rework influences in construction. Construction Management and Economics, 17(4), pp. 505-517. ISSN 01446193
Love, P E D; Tse, R Y C and Edwards, D J (2005) Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management, 131(2), pp. 187-194. ISSN 0733-9364
Love, P E D; Wang, X; Sing, C P and Tiong, R L K (2013) Determining the probability of project cost overruns. Journal of Construction Engineering and Management, 139(3), pp. 321-330. ISSN 0733-9364
Low, W W and Wong, K S (2023) The status quo of facebook usage among young generations in civil engineering education. International Journal of Construction Management, 23(9), pp. 1471-1483. ISSN 1562-3599
Lowe, D J (2006) Supervised work experience: The learning climate of construction companies and the factors that influence student experience. Architectural Engineering and Design Management, 2(1-2), pp. 49-60. ISSN 1745-2007
Lowe, D J; Emsley, M W and Harding, A (2006) Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7), pp. 750-758. ISSN 0733-9364
Lowe, R; Chiu, L F and Oreszczyn, T (2018) Socio-technical case study method in building performance evaluation. Building Research & Information, 46(5), pp. 469-484. ISSN 0961-3218
Lozon, J P (2008) Evaluating value improving practices for large scale projects. PhD thesis, University of Calgary, Canada.
Lu, H; Wang, H; Yu, D and Ye, J (2023) Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: A case study of huoshengshan and leishenshan hospital projects in wuhan. Engineering, Construction and Architectural Management, 30(8), pp. 3696-3712. ISSN 0969-9988
Lu, M (2002) Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling. Journal of Construction Engineering and Management, 128(5), pp. 438-445. ISSN 0733-9364
Lu, M (2003) Simplified discrete-event simulation approach for construction simulation. Journal of Construction Engineering and Management, 129(5), pp. 537-546. ISSN 0733-9364
Lu, M and AbouRizk, S M (2000) Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management, 126(3), pp. 219-226. ISSN 0733-9364
Lu, M and Lam, H C (2008) Critical path scheduling under resource calendar constraints. Journal of Construction Engineering and Management, 134(1), pp. 25-31. ISSN 0733-9364
Lu, M and Lam, H C (2009) Transform schemes applied on non-finish-to-start logical relationships in project network diagrams. Journal of Construction Engineering and Management, 135(9), pp. 863-873. ISSN 0733-9364
Lu, M; Lau, S C and Poon, C S (2009) Simulation approach to evaluating cost efficiency of selective demolition practices: Case of Hong Kong's Kai Tak Airport demolition. Journal of Construction Engineering and Management, 135(6), pp. 448-457. ISSN 0733-9364
Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364
Lu, M; Poon, C S and Wong, L C (2006) Application framework for mapping and simulation of waste handling processes in construction. Journal of Construction Engineering and Management, 132(11), pp. 1212-1221. ISSN 0733-9364
Lu, N and Liska, R W (2008) Designers' and general contractors' perceptions of offsite construction techniques in the united state construction industry. International Journal of Construction Education and Research, 4(3), pp. 177-188. ISSN 1557-8771
Lu, S and Sexton, M G (2009) The establishment and growth of a high technology firm: Interim results from an exploratory longitudinal case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Lu, W (2015) Collaboration in BIM-enabled projects: a socio-technical perspective. PhD thesis, University of Hong Kong, Hong Kong.
Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.
Lu, Z; Rodiek, S; Shepley, M M and Tassinary, L G (2015) Environmental influences on indoor walking behaviours of assisted living residents. Building Research & Information, 43(5), pp. 602-615. ISSN 0961-3218
Lucenti Jr., M J (1999) Flexible computer support for collaboration in civil infrastructure management. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Lucko, G; Helinski, P O and Ballesteros-Pérez, P (2026) Universal model for performance and delay tracking of linear construction schedules. Journal of Construction Engineering and Management, 152(5): 04026035, ISSN 0733-9364
Lucko, G (2008) Productivity scheduling method compared to linear and repetitive project scheduling methods. Journal of Construction Engineering and Management, 134(9), pp. 711-720. ISSN 0733-9364
Lucko, G (2009) Productivity scheduling method: Linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(4), pp. 246-253. ISSN 0733-9364
Lucko, G (2011) Integrating efficient resource optimization and linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 137(1), pp. 45-55. ISSN 0733-9364
Lucko, G (2011) Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), pp. 523-535. ISSN 0733-9364
Lucko, G (2013) Supporting financial decision-making based on time value of money with singularity functions in cash flow models. Construction Management and Economics, 31(3), pp. 238-253. ISSN 1466433X
Lucko, G; Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(6), pp. 575-594. ISSN 01446193
Lucko, G and Gattei, G (2016) Line-of-balance against linear scheduling: Critical comparison. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 26-44. ISSN 17514304
Lucko, G and Pea Orozco, A A (2009) Float types in linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(5), pp. 368-377. ISSN 0733-9364
Luiten, G T (1994) Computer-aided design for construction in the building industry. Dr thesis, Delft University of Technology, Netherlands.
Lummen, N S; Shirozu, H; Okada, N and Yamada, F (2016) Flood risk management an illustrative approach. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 388-405. ISSN 1759-5916
Lundberg, M and Lidelöw, H (2016) Testing a proposition for a knowledge management method for refurbishment. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work. PhD thesis, University of Michigan, USA.
Luo, H (2021) Automated construction machine pose monitoring using computer vision and deep learning for construction site safety. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Luo, S; Liu, Z; Yang, X; Lu, Q and Yin, J (2019) Construction technology of warm and hot mix epoxy asphalt paving for long-span steel bridge. Journal of Construction Engineering and Management, 145(12): 04019074, ISSN 0733-9364
Luo, X; Li, H; Huang, T and Skitmore, M (2016) Quantifying hazard exposure using real-time location data of construction workforce and equipment. Journal of Construction Engineering and Management, 142(8): 4016031, ISSN 0733-9364
Luong, D L; Tran, D H and Nguyen, P T (2021) Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. International Journal of Construction Management, 21(3), pp. 271-283. ISSN 1562-3599
Lutz, J D; Halpin, D W and Wilson, J R (1994) Simulation of learning development in repetitive construction. Journal of Construction Engineering and Management, 120(4), pp. 753-773. ISSN 0733-9364
Lutz, J D and Hijazi, A (1993) Planning repetitive construction: Current practice. Construction Management and Economics, 11(2), pp. 99-110. ISSN 01446193
Luvara, V G M and Benjamin, M (2025) Unveiling factors influencing the duration of arbitration practice in the Tanzania construction industry. International Journal of Building Pathology and Adaptation, 43(6), pp. 1612-1633. ISSN 2398-4708
Lv, X and El-Gohary, N M (2016) Discovering context-specific integration practices for integrating NEPA into statewide and metropolitan project planning processes. Journal of Construction Engineering and Management, 142(11): 04016056, ISSN 0733-9364
Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364
Ma, G; Wang, A; Li, N; Gu, L and Ai, Q (2014) Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12): 04014055, ISSN 0733-9364
Ma, H; Zhang, H and Chang, P (2020) 4D-based workspace conflict detection in prefabricated building constructions. Journal of Construction Engineering and Management, 146(9): 04020112, ISSN 0733-9364
Ma, L and Fu, H (2020) Exploring the influence of project complexity on the mega construction project success: A qualitative comparative analysis (QCA) method. Engineering, Construction and Architectural Management, 27(9), pp. 2429-2449. ISSN 0969-9988
Ma, S; Li, Z and Shen, Y (2025) Decision-making framework for selecting sustainable prefabricated residential building technology schemes under minimum assembly rate constraints. Journal of Construction Engineering and Management, 151(8): 04025100, ISSN 0733-9364
Maaith, N. and Sharmin, T. (2026) Socio-technical drivers of energy use in low-income housing in Jordan: Insights from a regression-based study. Building Research & Information, 54(4), pp. 510-533. ISSN 0961-3218
MacAskill, K and Guthrie, P (2014) Application of sustainability principles in post-disaster reconstruction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Machika, P (2007) Access to success: The value of bridging programmes in engineering at the University of Johannesburg. Journal of Engineering, Design and Technology, 5(2), pp. 120-128. ISSN 1726-0531
Machline, E; Pearlmutter, D; Cohen, C and Schwartz, M (2023) COVID-19: A catalyst for revitalizing mixed-use urban centers? The case of Paris. Building Research & Information, 51(1), pp. 39-55. ISSN 0961-3218
Machline, E; Pearlmutter, D and Schwartz, M (2018) Parisian eco-districts: Low energy and affordable housing? Building Research & Information, 46(6), pp. 636-652. ISSN 0961-3218
Maci, M (2010) Bid rigging in the EU public procurement markets. PhD thesis, Queen Mary University of London, UK.
Mackenzie, D I (2010) A review of project controls in the UK and methodologies to improve the processes. DProf thesis, Teesside University, UK.
Madanayake, U H; Ayinla, K O and Saka, A B (2026) An investigation of learner types and their unique preferences on the work-based learning (wbl) model: A case of quantity surveying apprenticeship. Construction Management and Economics, 44(1), pp. 1-22. ISSN 0144-6193
Maddah, R (2019) An analysis of risks faced by foreign construction firms in India and their effect on project performance. PhD thesis, Indian Institute of Technology Delhi, India.
Maddocks, A and Sher, W (1999) Introducing professional development at undergraduate level. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Madhubhashana, H S A; Perera, B A K S and Perera, C S R (2019) Post-tensioned concreting: its suitability for and acceptability in Sri Lanka. Journal of Engineering, Design and Technology, 17(4), pp. 719-735. ISSN 1726-0531
Maemura, Y; Kim, E and Ozawa, K (2018) Root causes of recurring contractual conflicts in international construction projects: Five case studies from Vietnam. Journal of Construction Engineering and Management, 144(8): 05018008, ISSN 0733-9364
Magdy, M; Abdel-Monem, M and El Dash, K (2022) Float loss impact on project cost. International Journal of Construction Management, 22(9), pp. 1647-1656. ISSN 1562-3599
Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.
Maghrebi, M; Shamsoddini, A and Waller, S T (2016) Fusion-based learning approach for predicting concrete pouring productivity based on construction and supply parameters. Construction Innovation, 16(2), pp. 185-202. ISSN 1471-4175
Mahalingam, A and Levitt, R E (2007) Safety issues on global projects. Journal of Construction Engineering and Management, 133(7), pp. 506-516. ISSN 0733-9364
Mahalingam, A; Yadav, A K and Varaprasad, J (2015) Investigating the role of lean practices in enabling BIM adoption: Evidence from two Indian cases. Journal of Construction Engineering and Management, 141(7): 5015006, ISSN 0733-9364
Mahamadu, A-M; Manu, P; Booth, C; Olomolaiye, P; Coker, A; Ibrahim, A and Lamond, J (2018) Infrastructure procurement skills gap amongst procurement personnel in Nigeria's public sector. Journal of Engineering, Design and Technology, 16(1), pp. 2-24.
Mahami, H; Nasirzadeh, F; Hosseininaveh Ahmadabadian, A; Esmaeili, F and Nahavandi, S (2019) Imaging network design to improve the automated construction progress monitoring process. Construction Innovation, 19(3), pp. 386-404. ISSN 1471-4175
Mahamid, I (2013) Common risks affecting time overrun in road construction projects in Palestine: Contractors' perspective. Construction Economics and Building, 13(2), pp. 45-53. ISSN 2204-9029
Mahamid, I (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction, 22(2), pp. 192-210. ISSN 1366-4387
Mahamid, I and Bruland, A (2012) Cost deviation in road construction projects: The case of Palestine. Construction Economics and Building, 12(1), pp. 58-71. ISSN 2204-9029
Mahamivanan, H; Ghassemi, N; Tayarani Darbandy, M; Shoeibi, A; Hussain, S; Nasirzadeh, F; Alizadehsani, R; Nahavandi, D; Khosravi, A and Nahavandi, S (2025) Material recognition for construction quality monitoring using deep learning methods. Construction Innovation, 25(3), pp. 732-760. ISSN 1471-4175
Mahammedi, C.; Mahdjoubi, L.; Booth, C.; Butt, T. E. and Al-mhdawi, M. K. S. (2026) The design and validation of a decision support system (DSS) for the preliminary risk assessment of brownfield sites (prabs). Smart and Sustainable Built Environment, 15(3), pp. 1255-1276. ISSN 2046-6099
Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.
Maharjan, S; Shrestha, P P and Srirangam, D (2023) Impact of mobilization costs on schedule performance of highway projects. Engineering, Construction and Architectural Management, 30(5), pp. 2008-2025. ISSN 0969-9988
Mahazir, M.; Zainudin, N. M. and Rahman, R. A. (2026) Modeling causes and strategies in BIM execution plan development: A PLS-SEM approach. Construction Innovation, pp. 1-31. ISSN 1471-4175
Mahdavian, A and Shojaei, A (2020) Hybrid genetic algorithm and constraint-based simulation framework for building construction project planning and control. Journal of Construction Engineering and Management, 146(12): 04020140, ISSN 0733-9364
Mahdavian, S; Lu, M and Pereira, E (2023) Application framework for safety-centric construction acceleration planning. Engineering, Construction and Architectural Management, 30(4), pp. 1401-1422. ISSN 0969-9988
Mahdi, I and Soliman, E (2021) Significant and top ranked delay factors in Arabic Gulf Countries. International Journal of Construction Management, 21(2), pp. 167-180. ISSN 1562-3599
Mahdi Hosseinian, S; Arjomand, A; Li, C Q and Zhang, G (2022) Developing a model for assessing project completion time reliability during construction using time-dependent reliability theory. Journal of Construction Engineering and Management, 148(4): 04022006, ISSN 0733-9364
Mahdi Hosseinian, S; Farahpour, E and Carmichael, D G (2020) Optimum outcome-sharing construction contracts with multiagent and multioutcome arrangements. Journal of Construction Engineering and Management, 146(7): 04020067, ISSN 0733-9364
Maheswari, J U; Mujumdar, P; Padala, S P S and Gwaskoti, A (2022) BDM–MDM integrated solution concept for scheduling information-driven projects. Engineering, Construction and Architectural Management, 29(2), pp. 1016-1037. ISSN 0969-9988
Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.
Mahjoubpour, B; Nasirzadeh, F; Mohammad Hosein Zadeh Golabchi, M; Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers' learning behavior in construction projects using agent-based approach: The case study of a steel structure project. Engineering, Construction and Architectural Management, 25(4), pp. 559-573. ISSN 0969-9988
Mahmood, A and Abrishami, S (2020) BIM for lean building surveying services. Construction Innovation, 20(3), pp. 447-470. ISSN 1471-4175
Mahmood, A F and Rafaa, M M (2022) Designing a collection of two IoT-systems for real time health telemonitoring. Journal of Engineering, Design and Technology, 20(1), pp. 86-98. ISSN 1726-0531
Mahmoodi, A. and Easa, S. M. (2026) A multi-objective matheuristic framework for sustainable truck-UAV last-mile delivery in smart urban built environments. Smart and Sustainable Built Environment, pp. 1-48. ISSN 2046-6099
Mahmoodzadeh, A; Nejati, H R; Flaih, L R; Ibrahim, H H; Alenizi, F A and Alassaf, Y (2024) A rigorous examination of twelve cutting-edge machine-learning techniques for predicting time and cost in tunneling projects. Journal of Construction Engineering and Management, 150(12): 04024176, ISSN 0733-9364
Majrouhi Sardroud, J (2011) Assessment and development of radio frequency identification applications for effective management of construction activities. PhD thesis, Kingston University, UK.
Majumdar, T (2024) Pmc: A classification of production metrics found useful by AEC professionals. PhD thesis, Stanford University, USA.
Mak, M Y; Ng, S T; Chen, S E and Varnam, M (2000) The relationship between economic indicators and Bromilow's time-cost model: A pilot study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Makwiranzou, C (2019) Building trust and managing risk between the client, consultant, and contractor in traditional and relational construction projects. PhD thesis, University of Liverpool, UK.
Malalgoda, C and Amaratunga, D (2015) A disaster resilient built environment in urban cities: The need to empower local governments. International Journal of Disaster Resilience in the Built Environment, 6(1), pp. 102-116. ISSN 1759-5916
Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.
Malekaee Ashtiyani, F; Karimi Gavareshki, M H and Gheidar-Kheljani, J (2026) AI-based multi-layer framework for monitoring productivity and coordinating subcontractors in construction projects. International Journal of Construction Management, 26(5), pp. 905-924. ISSN 1562-3599
Malekaee Ashtiyani, F.; Karimi Gavareshki, M. h and Gheidar-Kheljani, J. (2026) Real-time prediction of project duration deviation using CNN-LSTM-FIS. Built Environment Project and Asset Management, 16(2), pp. 304-320. ISSN 2044-124X
Malekzadeh, H; Edwards, D J and Harris, F C (2005) Simulating the ground freezing process: a decision support model. Journal of Construction Research, 6(1), pp. 107-121. ISSN 1609-9451
Mandala, R S K and Nayaka, R R (2025) A state of art review on time, cost and sustainable benefits of modern construction techniques for affordable housing. Construction Innovation, 25(2), pp. 363-380. ISSN 1471-4175
Manege, S L and Kennedy, C J (2022) Investigating whole life costing awareness in Tanzania building construction industry. International Journal of Construction Management, 22(15), pp. 2914-2921. ISSN 1562-3599
Manfield, P; Ashmore, J and Corsellis, T (2004) Design of humanitarian tents for use in cold climates. Building Research & Information, 32(5), pp. 368-378. ISSN 0961-3218
Mangano, G; Castelblanco, G; De Marco, A and Ottaviani, F M (2025) Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), pp. 193-210. ISSN 2044-124X
Mangezi, W (2019) Red tape in upgrading of informal settlements in Nelson Mandela Bay. PhD thesis, Nelson Mandela University, South Africa.
Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance. PhD thesis, University of Manchester, UK.
Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.
Mani, N; Kisi, K P; Rojas, E M and Foster, E T (2017) Estimating construction labor productivity frontier: Pilot study. Journal of Construction Engineering and Management, 143(10): 04017077, ISSN 0733-9364
Mannakkara, S and Wilkinson, S (2015) Supporting post-disaster social recovery to build back better. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 126-139. ISSN 1759-5916
Manninen, D L (1981) Labor force migration associated with nuclear power plant construction. PhD thesis, University of Washington, USA.
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) Assessment of critical factors influencing the performance of labour in Sri Lankan construction industry. International Journal of Construction Management, 23(1), pp. 144-155. ISSN 1562-3599
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A constructive system to assess the performance-based grading of construction labour through work-based training components and applications. Construction Economics and Building, 23(3-4), pp. 107-124. ISSN 2204-9029
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A guiding model for developing construction training programmes focusing on productivity and performance improvement for different qualification levels. Construction Innovation, 23(4), pp. 733-756. ISSN 1471-4175
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Assessing the performance and productivity of labour in building construction projects through the application of work-based training practices. Construction Innovation, 24(2), pp. 558-583. ISSN 1471-4175
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) A systematic evaluation on the competencies of construction supervisors in productivity and performance improvement practices: Sri Lankan perspective. Smart and Sustainable Built Environment, 13(4), pp. 960-988. ISSN 2046-6099
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, M M D R and Silva, R (2024) Assessing the competencies of construction supervisors in providing work-based training components for construction labour: Sri Lankan perspective. Journal of Engineering, Design and Technology, 22(5), pp. 1655-1681. ISSN 1726-0531
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, M M D R and Silva, R (2024) Assessing the competencies of construction supervisors in providing work-based training components for construction labour – Sri Lankan perspective. Journal of Engineering, Design and Technology, 22(5), pp. 1655-1681. ISSN 1726-0531
Manoharan, K; Dissanayake, P B G; Pathirana, C; Deegahawature, D and Silva, K D R R (2022) A curriculum guide model to the next normal in developing construction supervisory training programmes. Built Environment Project and Asset Management, 12(5), pp. 792-822. ISSN 2044-124X
Manoharan, K; Dissanayake, P B G; Pathirana, C; Deegahawature, D and Silva, K D R R (2023) A labour performance score and grading system to the next normal practices in construction. Built Environment Project and Asset Management, 13(1), pp. 36-55. ISSN 2044-124X
Manoj, G and Shivaji, C Y (2010) Design interface management of airport projects. International Journal of Construction Management, 10(3), pp. 29-44. ISSN 1562-3599
Mansell, P R (2021) Measuring infrastructure projects sustainable development goals impact (MISI). PhD thesis, London South Bank University, UK.
Mansoor, A; Liu, S; Ali, G M; Bouferguene, A and Al-Hussein, M (2023) A deep-learning classification framework for reducing communication errors in dynamic hand signaling for crane operation. Journal of Construction Engineering and Management, 149(2): 4022167, ISSN 0733-9364
Mansouri, S; Castronovo, F and Akhavian, R (2020) Analysis of the synergistic effect of data analytics and technology trends in the AEC/FM industry. Journal of Construction Engineering and Management, 146(3): 04019113, ISSN 0733-9364
Mantha, B R K and Garcia De Soto, B (2022) Investigating the fiducial marker network characteristics for autonomous mobile indoor robot navigation using ros and gazebo. Journal of Construction Engineering and Management, 148(10): 04022115, ISSN 0733-9364
Manthe, M and Smallwood, J (2007) The appropriateness of built environment tertiary education: Perspectives of academics and postgraduate students. Journal of Engineering, Design and Technology, 5(2), pp. 102-119. ISSN 1726-0531
Mantle, E J (2007) An evaluation of 3d building modelling and visualisation packages for enhancing public participation within the planning process. PhD thesis, University of Glamorgan, UK.
Manu, E; Ankrah, N A; Chinyio, E and Proverbs, D G (2011) Control influence on trust and relational governance in the client-contractor dyad. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Manu, P; Ankrah, N; Proverbs, D and Suresh, S (2014) The health and safety impact of construction project features. Engineering, Construction and Architectural Management, 21(1), pp. 65-93. ISSN 0969-9988
Manu, P; Mahamadu, A M; Booth, C; Olomolaiye, P O; Coker, A; Ibrahim, A and Lamond, J (2019) Infrastructure procurement capacity gaps in Nigeria public sector institutions. Engineering, Construction and Architectural Management, 26(9), pp. 1962-1985. ISSN 0969-9988
Manu, P A (2012) An investigation into the accident causal influence of construction project features. PhD thesis, University of Wolverhampton, UK.
Maqsoom, A; Choudhry, R M; Umer, M and Mehmood, T (2021) Influencing factors indicating time delay in construction projects: Impact of firm size and experience. International Journal of Construction Management, 21(12), pp. 1251-1262. ISSN 1562-3599
Maradza, E N (2015) Adaptation of industry BIM process standards in a large construction firm. PhD thesis, University of Reading, UK.
Maraqa, M J; Sacks, R and Spatari, S (2021) Quantitative assessment of the impacts of BIM and lean on process and operations flow in construction projects. Engineering, Construction and Architectural Management, 28(8), pp. 2176-2198. ISSN 0969-9988
Maravas, A and Pantouvakis, J P (2011) Fuzzy repetitive scheduling method for projects with repeating activities. Journal of Construction Engineering and Management, 137(7), pp. 561-564. ISSN 0733-9364
Marchant, T (2013) Keep going: Career perspectives on ageing and masculinity of self-employed tradesmen in Australia. Construction Management and Economics, 31(8), pp. 845-860. ISSN 1466433X
Mardikoraem, M (2021) Essays on decision problems under uncertainty. PhD thesis, University of Wisconsin - Milwaukee, USA.
Maria, C and Hollander, J B (2025) Urban façades and human stress: Evaluating façades' texture and layout. Building Research & Information, 53(8), pp. 1039-1057. ISSN 0961-3218
Mariaca Clavel, Israel Simon (2025) Dynamic construction scheduling: Utilizing AI data automation in a BIM-integrated serious game framework. PhD thesis, University College London, UK.
Marinelli, M (2019) Evaluation of PPP road projects in Greece. Built Environment Project and Asset Management, 9(2), pp. 186-198. ISSN 2044-124X
Marinelli, M D L F N L S (2015) Non-parametric bill-of-quantities estimation of concrete road bridge superstructure: An artificial neural networks approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Marion, G L C; Saurin, T A and Viana, D D (2025) The cost-benefit of slack in production planning and control in construction projects. Construction Management and Economics, 43(11), pp. 883-900. ISSN 0144-6193
Maritz, M J and Hattingh, V (2015) Electronic communication in the construction industry. Journal of Engineering, Design and Technology, 13(1), pp. 74-93.
Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599
Marnewick, C (2008) Ensuring succesful erp implementations using the vision-to-project framework. PhD thesis, University of Johannesburg, South Africa.
Marques, M; Monteiro, R and Delgado, R (2018) An improved model for seismic risk assessment in Portugal. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 70-83. ISSN 1759-5916
Marshall, J J (2008) City Inn v. Shepherd: A matter of judgement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 71-75. ISSN 17514312
Marteinsson, B (2005) Service life estimation in building design: A development of the factor method. PhD thesis, KTH Royal Institute of Technology, Sweden.
Martin, H; Lewis, T; Peters, E and Petersen, A (2017) Construction project delivery cloud decisionsupport model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 6-26. ISSN 17514304
Martin, H; Lewis, T M and Petersen, A (2016) Factors affecting the choice of construction project delivery in developing oil and gas economies. Architectural Engineering and Design Management, 12(3), pp. 170-188. ISSN 1745-2007
Martinez, E; Reid, C K and Tommelein, I D (2019) Lean construction for affordable housing: a case study in Latin America. Construction Innovation, 19(4), pp. 570-593. ISSN 1471-4175
Martinez-Avila, C and Olander, S (2024) Stakeholder participation in the implementation of urban property development projects. Construction Management and Economics, 42(10), pp. 926-941. ISSN 01446193
Martins, S S; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Evaluation of 4D BIM tools applicability in construction planning efficiency. International Journal of Construction Management, 22(15), pp. 2987-3000. ISSN 1562-3599
Marwah, H (2011) Investing in ghosts: Building and construction in Nigeria's oil boom and bust c1960-2000. PhD thesis, University of Oxford, UK.
Marx, H (2010) Employers' and agents' perspectives of the condition of the construction industry in South Africa. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Marzouk, M (2002) Optimizing earthmoving operations using computer simulation. PhD thesis, Concordia University, Canada.
Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175
Marzouk, M; Abdallah, M and El-Said, M (2010) Modeling microtunneling projects using computer simulation. Journal of Construction Engineering and Management, 136(6), pp. 670-682. ISSN 0733-9364
Marzouk, M and Amin, A (2013) Predicting construction materials prices using fuzzy logic and neural networks. Journal of Construction Engineering and Management, 139(9), pp. 1190-1198. ISSN 0733-9364
Marzouk, M and Ashmawy, M M (2021) Assessment of highways concrete and asphalt pavements using superiority inferiority ranking technique. Construction Innovation, 21(2), pp. 259-278. ISSN 1471-4175
Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
Marzouk, M and Moselhi, O (2003) Object-oriented simulation model for earthmoving operations. Journal of Construction Engineering and Management, 129(2), pp. 173-181. ISSN 0733-9364
Marzouk, M and Moselhi, O (2004) Fuzzy clustering model for estimating haulers' travel time. Journal of Construction Engineering and Management, 130(6), pp. 878-886. ISSN 0733-9364
Marzuki, P; Oktavianus, A; Regina, A and Hasiholan, B (2019) Interface problems in change order-challenged projects. Journal of Construction in Developing Countries, 24(2), pp. 1-22. ISSN 1823-6499
Masera, M (1999) An innovative planning technique in quality management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Mashamba, M S (1997) The construction industry in Zambia: opportunities and constraints under the structural adjustment programme and the enabling shelter strategy. PhD thesis, University of Newcastle upon Tyne, UK.
Mashamba, T (2024) A system dynamics model to enhance on-time delivery of infrastructure projects within a power utility in South Africa. PhD thesis, University of South Africa, South Africa.
Maslova, S and Burgess, G (2023) Delivering human-centred housing: Understanding the role of post-occupancy evaluation and customer feedback in traditional and innovative social housebuilding in England. Construction Management and Economics, 41(4), pp. 277-292. ISSN 01446193
Mason, B (2023) Advancing autonomous green stormwater infrastructure. PhD thesis, University of Michigan, USA.
Masood, R; Roy, K; González, V A; Lim, J B P and Nasir, A R (2024) A supply chain perspective of prefabricated housebuilding diffusion in New Zealand. Engineering, Construction and Architectural Management, 31(7), pp. 2697-2720. ISSN 0969-9988
Massoudi, A R (1995) Utilization of plant condition monitoring with reference to the Iranian construction industry. PhD thesis, Swansea University, UK.
Massyn, M and Jeune, K L (2010) Health and safety practices of contractors working on the expanded public works programme (epwp): A South African perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Masurier, J L; Rotimi, J O B and Wilkinson, S (2006) A comparison between routine construction and post-disaster reconstruction with case studies from New Zealand. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Mat Zin, R (2006) A case study of management control. A construction project: Issues of transaction costs and trust. PhD thesis, University of Manchester, UK.
Matipa, W M; Bain, I A and Naik, B (2010) Cost optimization techniques for sustainable buildings: Analysis beyond energy performance certificates. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Matthews, J D (1996) A project partnering approach to the main contractor - sub contractor relationship. PhD thesis, Loughborough University, UK.
Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.
Mattila, K G and Abraham, D M (1998) Linear scheduling: Past research efforts and future directions. Engineering, Construction and Architectural Management, 5(3), pp. 294-303. ISSN 0969-9988
Mattila, K G and Abraham, D M (1998) Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), pp. 232-243. ISSN 0733-9364
Mattila, K G and Bowman, M R (2004) Accuracy of highway contractor's schedules. Journal of Construction Engineering and Management, 130(5), pp. 647-655. ISSN 0733-9364
Mattila, K G and Park, A (2003) Comparison of linear scheduling model and repetitive scheduling method. Journal of Construction Engineering and Management, 129(1), pp. 56-64. ISSN 0733-9364
Maurya, K K and Biswas, A (2021) Performance assessment of governance in Indian smart city development. Smart and Sustainable Built Environment, 10(4), pp. 653-680. ISSN 2046-6099
Maver, T W (2020) The architectural and engineering design of buildings aided by computer: A personal memoir with selected publications. DSc thesis, University of Glasgow, UK.
Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(4), pp. 629-638. ISSN 1562-3599
Mayer, M (2020) Material recovery certification for construction workers. Buildings & Cities, 1(1), pp. 550-564. ISSN 2632-6655
Mazen, A M (2023) The extent to which the national and organisational culture contributes to delays of Libyan construction projects. PhD thesis, Bournemouth University, UK.
Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.
Mbabazi, A; Hegazy, T and Saccomanno, F (2005) Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131(10), pp. 1142-1144. ISSN 0733-9364
McAleenan, P (2016) A novel approach to health and safety in construction: culture, ethics reasoning and leadership. PhD thesis, University of South Wales, UK.
McArdle, K; Gunning, J G and Spillane, J P (2012) Effectiveness of the construction management courses. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
McCabe, B Y (1997) An automated modeling approach for construction performance improvement using simulation and belief networks. PhD thesis, University of Alberta, Canada.
McCabe, S; Crook, D; Rooke, J and Seymour, D (1997) Construction's experiences of attempting to become world class: The role of academics in assisting practitioners. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.
McCahill, D F and Bernold, L E (1993) Resource-oriented modeling and simulation in construction. Journal of Construction Engineering and Management, 119(3), pp. 590-606. ISSN 0733-9364
McCann, M (1986) An application of convex programming to construction scheduling. PhD thesis, Iowa State University, USA.
McCulloueh, B G and Gunn, P (1993) Construction field data acquisition with pen-based computers. Journal of Construction Engineering and Management, 119(2), pp. 374-384. ISSN 0733-9364
McCutcheon, R T (2001) Employment generation in public works: Recent South Africa experience. Construction Management and Economics, 19(3), pp. 275-284. ISSN 01446193
McDonald, B and Smithers, M (1998) Implementing a waste management plan during the construction phase of a project: A case study. Construction Management and Economics, 16(1), pp. 71-78. ISSN 01446193
McDonald, P R (1984) Construction claims costing for owners and contractors. Construction Management and Economics, 2(1), pp. 1-12. ISSN 01446193
McDougall, J A and Swaffield, J A (2007) Transport of deformable solids within building drainage networks. Building Research & Information, 35(2), pp. 220-232. ISSN 0961-3218
McElroy, D J and Rosenow, J (2019) Policy implications for the performance gap of low-carbon building technologies. Building Research & Information, 47(5), pp. 611-623. ISSN 0961-3218
McEvoy, M and Southall, R (2010) A programme of testing to evaluate a passive approach to whole-house ventilation. Construction Innovation, 10(4), pp. 395-407. ISSN 1471-4175
McGartland, M R and Hendrickson, C T (1985) Expert systems for construction project monitoring. Journal of Construction Engineering and Management, 111(3), pp. 293-307. ISSN 0733-9364
McGilligan, C; Wilde, P and Goodhew, S (2008) An assessment of the potential returns of energy certificates for the UK household sector. Journal of Financial Management of Property and Construction, 13(3), pp. 187-199. ISSN 1366-4387
McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.
McGuffin, A A and Obonyo, E (2010) Enhancing performance: A case study of the effects of employee coaching in construction practice. Construction Management and Economics, 28(2), pp. 141-149. ISSN 1466433X
McGuire, M. (2026) Impact of competition-based learning on student engagement and performance. International Journal of Construction Education and Research, 22(2), pp. 360-389. ISSN 1557-8771
McKillop, R; Hare, B and Lawani, K (2022) Evaluating the health and safety practices of construction small and medium-sized enterprise leaders. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
McLarnon, C; Spillane, J P; Bradley, J; McCartan, N and Nelson, M (2020) Open innovation within loughview timber: How knowledge transfer is opening doors to new markets. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
McLellan, R (1994) The use of project management procedures by construction contractors. PhD thesis, University of Strathclyde, UK.
McLeod, J S (2000) Planning for startup: An evaluation of factors affecting the startup of process industry facilities. PhD thesis, University of Texas at Austin, USA.
McMahon, E; Spillane, J P and Bradley, J G (2022) Factors influencing built environment apprenticeship completion rates: A systematic literature review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
McMahon, E; Spillane, J P and Bradley, J G (2024) Insights into apprenticeship completion: Perspectives from apprentice experiences. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
McNamara, E T; Howarth, T A P; Hill, C J and Stoneman, G R W (1997) Mentoring construction graduates: Bridging the gap between academia and industry. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Md-Ulang, N (2012) Communication of construction health and safety information in design. PhD thesis, Loughborough University, UK.
Meacham, B J (2022) Fire performance and regulatory considerations with modern methods of construction. Buildings & Cities, 3(1), pp. 464-487. ISSN 2632-6655
Meadati, P K (2007) Integration of construction process documents into building information modeling. PhD thesis, University of Nebraska - Lincoln, USA.
Meeampol, S and Ogunlan, S O (2006) Factors affecting cost and time performance on highway construction projects: Evidence from Thailand. Journal of Financial Management of Property and Construction, 11(1), pp. 3-20. ISSN 1366-4387
Meese, N (2012) Knowledge sharing for sustainable development: a mixed-method study of an international civil engineering consultancy. EngD thesis, University of Bath, UK.
Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.
Mehdi Riazi, Salman Riazi (2014) The use of supply chain management to reduce delays as result of pre-construction deficiencies in Malaysian public sector construction projects. PhD thesis, Queensland University of Technology, Australia.
Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364
Mehmood, U.; Ujang, U. and Azri, S. (2026) Spatiotemporal 3D GIS-integrated rule-based scheduling for high-rise maintenance optimisation: A Malaysian case study. Built Environment Project and Asset Management, 16(2), pp. 321-337. ISSN 2044-124X
Meintjes, I; Bowen, P and Root, D (2007) HIV/AIDS in the South African construction industry: Understanding the HIV/AIDS discourse for a sector-specific response. Construction Management and Economics, 25(3), pp. 255-266. ISSN 1466433X
Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.
Mejia Aguilar, G (2013) Improving accuracy of project outcome predictions. PhD thesis, University of Alabama, USA.
Mejlænder-Larsen, Ø (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(4), pp. 648-667. ISSN 0969-9988
Mejía, G and Franco-Duran, D M (2017) Evidence-based improvement policies in public management: A case study of public projects in Barrancabermeja City, Colombia. Journal of Construction in Developing Countries, 22(2), pp. 55-66. ISSN 1823-6499
Meldrum, A (2009) Measuring worker engagement as an aspect of health and safety performance in the construction industry: towards a best practice tool. PhD thesis, Glasgow Caledonian University, UK.
Meldrum, A; Hare, B and Cameron, I (2009) Road testing a health and safety worker engagement tool-kit in the construction industry. Engineering, Construction and Architectural Management, 16(6), pp. 612-632. ISSN 0969-9988
Melete, Refiloe (2024) An analysis of the effectiveness of the infrastructure delivery management system in the South African government. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Melson, S and Kronstam, T (1999) An approach to infrastructure client projects. Engineering, Construction and Architectural Management, 6(1), pp. 71-77. ISSN 0969-9988
Melzner, J; Zhang, S; Teizer, J and Bargstädt, H J (2013) A case study on automated safety compliance checking to assist fall protection design and planning in building information models. Construction Management and Economics, 31(6), pp. 661-674. ISSN 1466433X
Memarian, B and Mitropoulos, P (2014) Production system design for speed and reliability: A case study in concrete construction. International Journal of Construction Education and Research, 10(3), pp. 181-200. ISSN 1557-8771
Memon, F A (2023) Stakeholder engagement in managing scope change during the execution phase of UK construction projects. PhD thesis, University of Bedfordshire, UK.
Menches, C L (2006) Effect of pre-construction planning on electrical project performance. PhD thesis, University of Wisconsin - Madison, USA.
Menches, C L and Chen, J (2013) Using ecological momentary assessment to understand a construction worker's daily disruptions and decisions. Construction Management and Economics, 31(2), pp. 180-194. ISSN 1466433X
Menches, C L and Hanna, A S (2006) Conceptual planning process for electrical construction. Journal of Construction Engineering and Management, 132(12), pp. 1306-1313. ISSN 0733-9364
Menches, C L and Hanna, A S (2006) Quantitative measurement of successful performance from the project manager's perspective. Journal of Construction Engineering and Management, 132(12), pp. 1284-1293. ISSN 0733-9364
Menches, C L; Hanna, A S; Nordheim, E V and Russell, J S (2008) Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(8), pp. 855-869. ISSN 01446193
Mendes, J R; Fernando, L; Heineck, M and Vaca, O L (1998) New applications of line of balance on scheduling of multi-storey buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364
Mengistu, D G; Ashene, D A and Halabo, H A (2024) Technology and innovation development in Ethiopian construction industry: the challenges and improvement mechanisms. Journal of Engineering, Design and Technology, 22(6), pp. 1936-1957. ISSN 1726-0531
Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988
Merna, T (2004) Assessing methods to analyse portfolios of projects and their risks procured by project finance. PhD thesis, University of Manchester, UK.
Merryweather Powell, J. and Shibeika, A. (2025) Brexit and beyond: Addressing skills shortage in the UK construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 50-57. ISSN 1751-4304
Messi, Leonardo (2022) Development of a BIM-based simulator for workspace management in construction. PhD thesis, Università Politecnica delle Marche, Italy.
Metawa, K O (1987) The transfer of construction management technology to developing countries - Libya as a case study. PhD thesis, University of Manchester, UK.
Meyer, M A; Hendricks, M; Newman, G D; Masterson, J H; Cooper, J T; Sansom, G; Gharaibeh, N; Horney, J; Berke, P; van Zandt, S and Cousins, T (2018) Participatory action research: Tools for disaster resilience education. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 402-419. ISSN 1759-5916
Mezher, T M and Tawil, W (1998) Causes of delay in the construction industry in Lebanon. Engineering, Construction and Architectural Management, 5(3), pp. 252-260. ISSN 0969-9988
Miao, K; Lou, W; Schonfeld, P and Xiao, Z (2024) Optimal earthmoving-equipment combination considering carbon emissions with an indicator-based multiobjective optimizer. Journal of Construction Engineering and Management, 150(1): 04023152, ISSN 0733-9364
Miceli, A; Bevill, G and Simsiriwong, J (2025) Effect of additively manufactured polymeric inserts on impact response of construction safety helmets. Journal of Engineering, Design and Technology, 23(5), pp. 1653-1665. ISSN 1726-0531
Miers, R J (2001) Critical needs in current construction management education practices: The problem solving process as related to the curriculum. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Mihara, H; Yoshida, T; Suzuki, K and Hojo, T (2012) A study on new construction techniques and skills training with focus on the plastering subcontractor in Japan. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Mikulić, D; Lovrinčević, Ž and Keček, D (2021) Valorization of economic effects from the programme of energy renovation of public buildings in Croatia. Building Research & Information, 49(5), pp. 561-573. ISSN 0961-3218
Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451
Miller, S and Dorée, A (2008) Improving logistics in the asphalt paving process: What can we learn from the planner's logic? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Miller, S; Haupt, T C and Chileshe, N (2005) Student perceptions of the first year civil engineering course content. Journal of Engineering, Design and Technology, 3(2), pp. 180-189. ISSN 1726-0531
Mills, A; Wingrove, D and McLaughlin, P (2010) Exploring the development and assessment of work-readiness using reflective practice in construction education. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Mills, G R W and Razmdoost, K (2016) Managing value co-creation/destruction: A longitudinal education capital programme/project case study. Construction Management and Economics, 34(4-5), pp. 286-301. ISSN 01446193
Minchin, R E; Li, X; Issa, R R and Vargas, G G (2013) Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida. Journal of Construction Engineering and Management, 139(10): 04013007, ISSN 0733-9364
Minchin, R E and Thomas, H R (2003) Validation of vibration-based onboard asphalt density measuring system. Journal of Construction Engineering and Management, 129(1), pp. 1-7. ISSN 0733-9364
Minchin Jr, R E; Henriquez, N R; King, A M and Lewis, D W (2010) Owners respond: Preferences for task performance, delivery systems, and quality management. Journal of Construction Engineering and Management, 136(3), pp. 283-293. ISSN 0733-9364
Minchin Jr, R E; Lewis, D W and McLeod, L (2011) Improving productivity on a troubled bridge project. Journal of Construction Engineering and Management, 137(5), pp. 364-371. ISSN 0733-9364
Mirzaei, A; Nasirzadeh, F; Parchami Jalal, M and Zamani, Y (2018) 4D-BIM dynamic time-space conflict detection and quantification system for building construction projects. Journal of Construction Engineering and Management, 144(7): 04018056, ISSN 0733-9364
Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), pp. 26-33. ISSN 1562-3599
Miskawi, Z (1993) A numerical analysis method for computing schedule and resource forecasting for industrial projects. Construction Management and Economics, 11(6), pp. 411-420. ISSN 01446193
Missa, P (2013) An investigation of the underrepresentation of BMEs in the UK construction industry. PhD thesis, University of Salford, UK.
Mlybari, E A A (2011) Managing value, requirements and risk in the appraisal stage of UK construction projects. PhD thesis, University of Leeds, UK.
Mo, Y; Dainty, A and Price, A (2007) An assessment of the emotional intelligence of construction students: An empirical investigation. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Mo, Y Y (2010) Measuring and enhancing the emotional intelligence of built environment students. PhD thesis, Loughborough University, UK.
Mogaji, I J; Mewomo, M C and Bondinuba, F K (2024) Assessment of barriers to the adoption of innovative building materials (IBM) for sustainable construction in the Nigerian construction industry. Engineering, Construction and Architectural Management, 32(13), pp. 1-26. ISSN 0969-9988
Mogaji, L (2019) Examining the impact of earned value management on construction project outcomes in Nigeria. PhD thesis, Capella University, USA.
Mogge Jr., J W (2004) Breaking through the first cost barriers of sustainable planning, design, and construction. PhD thesis, Georgia Institute of Technology, USA.
Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.
Mohamad Kamar, K A (2011) Critical success factors to industrialised building system contractor. PhD thesis, University of Salford, UK.
Mohamed, M; Abdelaty, A; Khresat, G and Abu El Rub, M (2026) Mapping the patterns of cost and time overruns in the U.S. Highway construction projects: A regional risk analysis. International Journal of Construction Management, 26(3), pp. 470-481. ISSN 1562-3599
Mohamed, A H (2016) Lean construction as an innovative approach for minimising risks in mega-Construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.
Mohamed, Emad (2021) Decision-support system for construction risk management in onshore wind projects. PhD thesis, University of Alberta, Canada.
Mohamed, I F; Edwards, D J; Mateo-Garcia, M; Costin, G and Thwala, W D D (2020) An investigation into the construction industry's view on fire prevention in high-rise buildings post Grenfell. International Journal of Building Pathology and Adaptation, 38(3), pp. 451-471. ISSN 23984708
Mohamed, M and Tran, D Q (2023) Content analysis of e-inspection implementation for highway infrastructure construction projects. Engineering, Construction and Architectural Management, 30(7), pp. 2621-2644. ISSN 0969-9988
Mohamed, M A; Hamzah, M J A; Pauzi, N N; Shahrudin, N S N and Sheffie, S I M (2023) The effect of COVID-19 on construction site personnel: Psychological and physiological perspectives. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Mohamed, O and Egbu, C (2010) Measuring the impact of knowledge sharing on the planning permission process in Malaysian local authorities. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Mohamed, S Y (2020) Stochastic performance and maintenance optimization models for pavement infrastructure management. PhD thesis, Purdue University, USA.
Mohamed, T (2023) Modelling interaction between schedule performance and schedule determinants of construction projects. PhD thesis, Loughborough University, UK.
Mohamed, Y; Borrego, D; Francisco, L; Al-Hussein, M; Abourizk, S and Hermann, U (2007) Simulation-based scheduling of module assembly yards: Case study. Engineering, Construction and Architectural Management, 14(3), pp. 293-311. ISSN 0969-9988
Mohammad Al-Naghi, A; Alaghbari, W and Barakat, T (2025) Impact of leadership skills on the success of large and medium construction projects management in Yemen. International Journal of Construction Management, 25(11), pp. 1346-1356. ISSN 1562-3599
Mohammadi, A; Amador-Jimenez, L and Nasiri, F (2020) Reliable, effective, and sustainable urban railways: A model for optimal planning and asset management. Journal of Construction Engineering and Management, 146(6): 04020057, ISSN 0733-9364
Mohammadi, A; Igwe, C; Amador-Jimenez, L and Nasiri, F (2020) Applying lean construction principles in road maintenance planning and scheduling. International Journal of Construction Management, 22(12), pp. 2364-2374. ISSN 1562-3599
Mohammed, A; Bahatheq, A; Ghaithan, A; Alshibani, A; Mazher, K M and Alrashidi, A (2026) Predicting schedule delays of construction projects in the oil and gas industry: Comparative study. Built Environment Project and Asset Management, 16(2), pp. 286-303. ISSN 2044-124X
Mohammed, A W (2016) Agent-based modeling of abc methods for decisionmaking in highway bridge projects including uncertainty and several stakeholders. PhD thesis, Western Michigan University, USA.
Mohareb, E; Gillich, A and Bristow, D (2022) Participation in domestic energy retrofit programmes: Key spatio-temporal drivers. Buildings & Cities, 3(1), pp. 356-375. ISSN 2632-6655
Mohd Nor, M F I (2019) The development of a pedagogical framework for the integration of building information modelling in the architecture degree programme in Malaysia. PhD thesis, University of Strathclyde, UK.
Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations. PhD thesis, University of Maryland, College Park, USA.
Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364
Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.
Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.
Mokhtar, A H M (1998) An information model for managing design changes in a collaborative multidisciplinary design environment. PhD thesis, Concordia University, Canada.
Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364
Mollo, L G; Emuze, F and Smallwood, J (2019) Improving occupational health and safety (OHS) in construction using training-within-industry method. Journal of Financial Management of Property and Construction, 24(3), pp. 655-671. ISSN 1366-4387
Mollo, L G; Emuze, F and Smallwood, J (2023) A proposed training-within-industry-informed human failure reduction framework for South African construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(3), pp. 104-112. ISSN 17514304
Momennia Rankohi, S (2022) Investigating the concept of integration in construction projects: Cases of integrated project delivery and design for manufacturing and assembly. PhD thesis, Ecole Polytechnique, Montreal, Canada.
Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology. DEng thesis, George Washington University, USA.
Moncaster, A (2012) Constructing sustainability: connecting the social and the technical in a case study of school building projects. PhD thesis, University of East Anglia, UK.
Moncaster, A M and Simmons, P (2015) Policies and outcomes for UK sustainable schools. Building Research & Information, 43(4), pp. 452-464. ISSN 0961-3218
Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599
Monyane, T G (2019) "A lean-led-evaluation" of infrastructure development improvement programme in South Africa. PhD thesis, Nelson Mandela University, South Africa.
Moore, D R; Paterson, G and Martinez, R S (2004) Sustainable communities: A proposal linking the management of forestation and agricultural waste with the development of recyclable housing. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Moore, N (2013) A model based system for contextual on-site construction planning in augmented reality. PhD thesis, University of Wolverhampton, UK.
Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.
Morad, A A (1990) Geometric-based reasoning system for project planning utilizing AI and CAD technologies. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Morad, A A and Beliveau, Y J (1991) Knowledge-based planning system. Journal of Construction Engineering and Management, 117(1), pp. 1-12. ISSN 0733-9364
Moradi, S and Kähkönen, K (2022) Success in collaborative construction through the lens of project delivery elements. Built Environment Project and Asset Management, 12(6), pp. 973-991. ISSN 2044-124X
Moradi, S; Kähkönen, K; Klakegg, O J and Aaltonen, K (2021) Profile of project managers' competencies for collaborative construction projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Moradipour, P; Noorzaei, J; Jaafar, M S and Aziz, F N A A (2013) An improved computational method in structural dynamics. Journal of Engineering, Design and Technology, 11(3), pp. 288-315. ISSN 1726-0531
Moragane, H P M N L B; Perera, B A K S; Palihakkara, A D and Ekanayake, B (2024) Application of computer vision for construction progress monitoring: A qualitative investigation. Construction Innovation, 24(2), pp. 446-469. ISSN 1471-4175
Moreno, M; Ortiz, R and Ortiz, P (2024) Remote sensing to assess the risk for cultural heritage: Forecasting potential collapses due to rainfall in historic fortifications. International Journal of Building Pathology and Adaptation, 42(1), pp. 92-113. ISSN 23984708
Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.
Moret, Y and Einstein, H H (2012) Modeling correlations in rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1075-1084. ISSN 0733-9364
Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364
Morgado, J and Neves, J (2014) Work zone planning in pavement rehabilitation: Integrating cost, duration, and user effects. Journal of Construction Engineering and Management, 140(11): 4014050, ISSN 0733-9364
Morkos, R (2014) Operational efficiency frontier: Visualizing, manipulating, and navigating the construction scheduling state space with precedence, discrete, and disjunctive constraints. PhD thesis, Stanford University, USA.
Morris, J (1999) Improving construction design: the lean thinking paradigm. PhD thesis, Cranfield University, UK.
Morris, P W G (1972) A study of selected building projects in the context of theories of organization. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Morrison, S and Trushell, I (2016) Payment for offsite goods and materials: The Scottish perspective. Construction Management and Economics, 34(10), pp. 679-687. ISSN 0144-6193
Morrissey, D; Goodier, C and Demian, P (2024) Offsite construction in ireland’s hospitals: Unveiling the complexities of OSC adoption. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Morua Padilla, E (1986) Resource strategies for dynamic construction project management. PhD thesis, University of Michigan, USA.
Moscati, A and Engström, S (2019) Digitalization and industrialization: Exploration of the current and future challenges in the Swedish built environment sector. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Moselhi, O and Deb, B (1993) Project selection considering risk. Construction Management and Economics, 11(1), pp. 45-52. ISSN 01446193
Moselhi, O and Ei-Rayes, K (1993) Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, 119(4), pp. 681-697. ISSN 0733-9364
Moselhi, O; Fazio, P and Hason, S (1992) Automation of concrete slab-on-grade construction. Journal of Construction Engineering and Management, 118(4), pp. 731-748. ISSN 0733-9364
Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364
Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175
Moselhi, O and Lorterapong, P (1993) Near optimal solution for resource-constrained scheduling problems. Construction Management and Economics, 11(4), pp. 293-303. ISSN 01446193
Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364
Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175
Moses, S (2008) Improving interoperability of AEC collaborative software through the creation of data exchange standards. PhD thesis, Loughborough University, UK.
Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988
Mostafa, K and Hegazy, T (2025) Smart rehabilitation-planning framework for sustainable infrastructure: Roofing application. Journal of Construction Engineering and Management, 151(2): 04024203, ISSN 0733-9364
Mostafa, S and Chileshe, N (2015) Discrete-event simulation model for offsite manufacturing in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Mostafa, S and Chileshe, N (2018) Application of discrete-event simulation to investigate effects of client order behaviour on off-site manufacturing performance in Australia. Architectural Engineering and Design Management, 14(1-2), pp. 139-157. ISSN 1745-2007
Mostafa, S; Tam, V W; Dumrak, J and Mohamed, S (2020) Leagile strategies for optimizing the delivery of prefabricated house building projects. International Journal of Construction Management, 20(8), pp. 867-881. ISSN 1562-3599
Motaleb, O and Kishk, M (2010) An investigation into causes and effects of construction delays in UAE. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Motaleb, O H (2014) Development of a risk response model to handle delays of construction projects in the United Arab Emirates. PhD thesis, Robert Gordon University, UK.
Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.
Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Motil, M M (2015) Project duration, budget, individual role, and burnout among construction managers. PhD thesis, Walden University, USA.
Moura, A C M; Morais, C F and Gonçalves Mello, T A (2024) Geodesign and sustainable development goals in the environmental parameterization of the iron quadrangle region, Brazil: An academic experience. International Journal of Building Pathology and Adaptation, 42(2), pp. 294-317. ISSN 23984708
Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.
Moussa, M; Ruwanpura, J and Jergeas, G (2007) CTAN for risk assessments using multilevel stochastic networks. Journal of Construction Engineering and Management, 133(1), pp. 96-101. ISSN 0733-9364
Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988
Moussavi Nadoushani, Z S; Hammad, A W A and Akbarnezhad, A (2017) Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs. Journal of Construction Engineering and Management, 143(1): 04016089, ISSN 0733-9364
Moussourakis, J and Haksever, C (2004) Flexible model for time/cost tradeoff problem. Journal of Construction Engineering and Management, 130(3), pp. 307-314. ISSN 0733-9364
Moussourakis, J and Haksever, C (2007) Models for accurate computation of earliest and latest start times and optimal compression in project networks. Journal of Construction Engineering and Management, 133(8), pp. 600-608. ISSN 0733-9364
Moussourakis, J and Haksever, C (2010) Project compression with nonlinear cost functions. Journal of Construction Engineering and Management, 136(2), pp. 251-259. ISSN 0733-9364
Moyo, T and Chigara, B (2023) Expected competencies of construction project managers in Zimbabwe. Journal of Engineering, Design and Technology, 21(3), pp. 711-732. ISSN 1726-0531
Moyo, T; Mukawa, M; Moyo, C and Chigara, B (2023) Expected competencies of quantity surveyors in Zimbabwe. Journal of Construction in Developing Countries, 28(1), pp. 19-42. ISSN 1823-6499
Mpofu, B; Ochieng, E G; Moobela, C and Pretorius, A (2017) Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management, 24(2), pp. 346-376. ISSN 0969-9988
Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.
Muir Jr., R W (2015) Application of lean construction principles to highway projects: Analysis of barriers to timely delivery of service. PhD thesis, Drexel University, USA.
Mullens, M A and Arif, M (2006) Structural insulated panels: Impact on the residential construction process. Journal of Construction Engineering and Management, 132(7), pp. 786-794. ISSN 0733-9364
Mun, H; Jeong, J; Jeong, J and Kumi, L (2025) Statistical hypothesis test approach considering workers' thermal comfort to determine nonworking days in different climate zones. Journal of Construction Engineering and Management, 151(9): 04025116, ISSN 0733-9364
Muneeswaran, G; Manoharan, P; Awoyera, P O and Adesina, A (2020) A statistical approach to assess the schedule delays and risks in Indian construction industry. International Journal of Construction Management, 20(5), pp. 450-461. ISSN 1562-3599
Muniandy, Meenachi (2016) Assessing the economic impact of public investment in Malaysia: A case study on myrapid transit project using a dynamic computable general equilibrium model. PhD thesis, Monash University, Australia.
Murphy, M; Dainty, A and Ren, Z (2011) Understanding women's experiences of construction education: A need for longitudinal research? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Murray, M. (2024) Civil engineering employers' engagement in work-integrated learning. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 58-70. ISSN 1751-4304
Murray, Alex (2018) Returns on public capital investment: Procurement, whole life cost and value in English schools and hospitals, from 1997-2012. PhD thesis, University College London, UK.
Murray, M D; Tookey, J E and Chan, A P (2001) Respect for people: Looking at KPIs through 'younger eyes'! In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Murtaza, M B (1993) A decision support model integrating neural networks and an expert system for construction modularization. PhD thesis, University of Houston, USA.
Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry. PhD thesis, Nottingham Trent University, UK.
Musa, M M; Amirudin, R B; Sofield, T and Musa, M A (2015) Influence of external environmental factors on the success of public housing projects in developing countries. Construction Economics and Building, 15(4), pp. 30-44. ISSN 2204-9029
Musa, M M; Saleh, I M; Ibrahim, Y and Dandajeh, M A (2023) Assessment of awareness and barriers to the application of lean construction techniques in kano state, Nigeria. Journal of Construction Business and Management, 6(1), pp. 33-42. ISSN 2521-0165
Musenero, L; Baroudi, B and Gunawan, I (2023) Critical issues affecting dispute resolution practice in infrastructure public-private partnerships. Journal of Construction Engineering and Management, 149(3): 04023001, ISSN 0733-9364
Musselwhite, D; Gledson, B and Greenwood, D (2021) Matters affecting construction project-level planning effectiveness: A literature review. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Musselwhite D, G B (2024) An analysis of activity-level predictability from UK construction projects. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Mustapha, F; Al-Abed, A and Wild, S (1995) A model for assessing the effectiveness of public housing in Sana'a (Republic of Yemen). Construction Management and Economics, 13(6), pp. 457-465. ISSN 01446193
Mustapha, Z (2017) An integrated health and safety compliance model for the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Muya, M; Mulenga, M N; Bwalya, D C; Edum-Fotwe, F T and Price, A D F (2003) Construction skills requirement issues in Zambia. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Muya, M; Price, A D F and Edum-Fotwe, F T (2006) Overview of funding for construction craft skills training in Sub-Saharan Africa: A case study of Zambia. Construction Management and Economics, 24(2), pp. 197-208. ISSN 01446193
Muya, M; Price, A D F; Thorpe, A and Edum-Fotwe, F (1999) Application of analytic hierarchy process to the evaluation of logistics factors and their contribution to improvements in construction materials supply. Journal of Construction Procurement, 5(2), pp. 99-117. ISSN 1358-9180
Muzondo, F T (2020) The limitations of the South African procurement policies and practices in relation to contractor selection criteria: The importance of technical qualifications and experience of established construction companies. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.
Mwelu, N (2020) Compliance and regulatory framework in public procurement of public road construction projects in Uganda. PhD thesis, University of Newcastle, Australia.
Mwelu, N; Watundu, S and Moya, M (2024) Demand side perception on success factors for implementing public road construction projects. Journal of Construction in Developing Countries, 29(1), pp. 1-22. ISSN 1823-6499
Myers, H; Wade, F and Webb, J (2019) Mapping emerging subcontracting networks for the energy efficiency retrofit of hard-to-treat buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
N, H. K. and Padala, S. P. S. (2026) A bibliometric review of digital twin-enabled technologies for construction project monitoring and control. Built Environment Project and Asset Management, 16(3), pp. 441-460. ISSN 2044-124X
Naas, J D (1990) Identifying and predicting present and future occupational competencies for commercial construction superintendents in Illinois. PhD thesis, Southern Illinois University at Carbondale, USA.
Nadafi, S; Moosavirad, S H and Ariafar, S (2019) Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management, 26(9), pp. 2107-2119. ISSN 0969-9988
Nafe Assafi, M; Hoque, M I and Hossain, M M (2024) Investigating the causes of construction delay on the perspective of organization-sectors involved in the construction industry of Bangladesh. International Journal of Building Pathology and Adaptation, 42(4), pp. 788-817. ISSN 23984708
Nafe Assafi, M; Hossain, M M; Chileshe, N and Datta, S D (2023) Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in bangladeshi construction sector. Construction Innovation, 23(5), pp. 1255-1278. ISSN 1471-4175
Nageeb, M (2012) The effectiveness of the hybrid graphical representation method in visually combining and communicating logical and spatial relationships between scheduled activities. PhD thesis, Texas A&M University, USA.
Naim, A A A A (2018) An investigation of building information modelling implementation in KSA. PhD thesis, University of Wolverhampton, UK.
Naismith, N; Price, A D F; Dainty, A R J; Bryman, A; Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(2),
Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364
Naji, K K; Gunduz, M and Naser, A F (2022) The effect of change-order management factors on construction project success: A structural equation modeling approach. Journal of Construction Engineering and Management, 148(9): 04022085, ISSN 0733-9364
Nakajima, T (1972) Modeling and optimization of the building process for systems building. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Nallaperuma-Arachchige, W; Hadiwattege, C and Hulathdoowage, N D (2023) Conflicts with external stakeholders in irrigation construction projects in Sri Lanka: A narrative analysis. International Journal of Construction Management, 23(15), pp. 2570-2582. ISSN 1562-3599
Nam, C H and Tatum, C B (1997) Leaders and champions for construction innovation. Construction Management and Economics, 15(3), pp. 259-270. ISSN 01446193
Nanayakkara, L (1999) An interpretive research methodology for assessing the appicability of western productivity techniques in Sri Lanka. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Nani, G; Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(6), pp. 754-777.
Naoum, S and Hackman, J O N (1996) Do site managers and the head office perceive productivity factors differently? Engineering, Construction and Architectural Management, 3(1-2), pp. 147-160. ISSN 0969-9988
Naoum, S G (1994) Critical analysis of time and cost of management and traditional contracts. Journal of Construction Engineering and Management, 120(4), pp. 687-705. ISSN 0733-9364
Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(1), pp. 50-63. ISSN 1358-9180
Nasir, D; McCabe, B and Hartono, L (2003) Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model. Journal of Construction Engineering and Management, 129(5), pp. 518-527. ISSN 0733-9364
Nasirian, A; Abbasi, B; Cheng, T C E and Arashpour, M (2022) Multiskilled workforce planning: A case from the construction industry. Journal of Construction Engineering and Management, 148(5): 04022021, ISSN 0733-9364
Nasirian, A; Arashpour, M; Abbasi, B; Zavadskas, E K and Akbarnezhad, A (2019) Skill set configuration in prefabricated construction: Hybrid optimization and multicriteria decision-making approach. Journal of Construction Engineering and Management, 145(9): 04019050, ISSN 0733-9364
Nasirzadeh, F; Khanzadi, M and Mir, M (2018) A hybrid simulation framework for modelling construction projects using agent-based modelling and system dynamics: An application to model construction workers' safety behavior. International Journal of Construction Management, 18(2), pp. 132-143. ISSN 1562-3599
Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.
Nassar, K M; Gunnarsson, H G and Hegab, M Y (2005) Using weibull analysis for evaluation of cost and schedule performance. Journal of Construction Engineering and Management, 131(12), pp. 1257-1262. ISSN 0733-9364
Nassar, K M and Hegab, M Y (2006) Developing a complexity measure for project schedules. Journal of Construction Engineering and Management, 132(6), pp. 554-561. ISSN 0733-9364
Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364
Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364
Navab-Kashani, R; Gay, L F and Bayat, A (2015) Productivity improvement of sewer CCTV inspection through time study and route optimization. Journal of Construction Engineering and Management, 141(6): 04015009, ISSN 0733-9364
Navon, R (1995) Economic benefits of lightweight versus conventional construction methods. Journal of Construction Engineering and Management, 121(1), pp. 27-36. ISSN 0733-9364
Navon, R and Berkovich, O (2005) Development and on-site evaluation of an automated materials management and control model. Journal of Construction Engineering and Management, 131(12), pp. 1328-1336. ISSN 0733-9364
Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X
Navon, R and Goldschmidt, E (2003) Can labor inputs be measured and controlled automatically? Journal of Construction Engineering and Management, 129(4), pp. 437-445. ISSN 0733-9364
Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), pp. 1225-1229. ISSN 1466433X
Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193
Nawaz Khan, A; Khan, N A and Soomro, M A (2020) Influence of ethical leadership in managing human resources in construction companies. Journal of Construction Engineering and Management, 146(11): 04020125, ISSN 0733-9364
Nawfal, S and Ali, F (2018) The acceleration of 3D graphics transformations based on cuda. Journal of Engineering, Design and Technology, 16(6), pp. 925-937. ISSN 1726-0531
Nawi, M N M (2012) Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects. PhD thesis, University of Salford, UK.
Naylor, G; Raidén, A B and Morgan, A (2009) Constructing apprenticeships; transforming through sharing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Nayyer, M I and Annamalai, T R (2024) Procuring authorities and project performance: A case study of PPP highway projects in India. Built Environment Project and Asset Management, 14(1), pp. 38-55. ISSN 2044-124X
Nayyer, M I; Aravindan, M R and Annamalai, T R (2024) Impact of transparency law on the post-award development phase of toll and annuity PPPs. Built Environment Project and Asset Management, 14(1), pp. 22-37. ISSN 2044-124X
Ndekugri, I; Braimah, N and Gameson, R (2008) Delay analysis within construction contracting organizations. Journal of Construction Engineering and Management, 134(9), pp. 692-700. ISSN 0733-9364
Nee, T S; Xing, A C and Yong, L Y (2024) Assessing the post-disaster effects of COVID-19 pandemic towards Malaysian construction industry. Journal of Construction in Developing Countries, 29(2), pp. 59-75. ISSN 1823-6499
Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation. PhD thesis, University of Maryland, College Park, USA.
Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.
Nemati, Saeed (2019) Foam-filled structural panels using pneumatic fabric formwork for rapidly assembled buildings. PhD thesis, Western Sydney University, Australia.
Nepal, M P; Park, M and Son, B (2006) Effects of schedule pressure on construction performance. Journal of Construction Engineering and Management, 132(2), pp. 182-188. ISSN 0733-9364
Nevett Fernández, G (2020) Duration estimators and productivity metrics for highway construction. PhD thesis, University of Colorado at Boulder, USA.
Newton, A J (1995) The planning and management of detailed building design. PhD thesis, Loughborough University, UK.
Ng, Y. Y.; Ma, Q. and Yam, M. C. H. (2026) Optimizing subcontractor selection: A dual-model AHP framework for aligning client and contractor priorities in construction. Journal of Engineering, Design and Technology, 24(4), pp. 869-893. ISSN 1726-0531
Ng, A K W and Price, A D F (2010) Optimizing the time performance of subcontractors in building projects. Construction Economics and Building, 10(1-2), pp. 90-102. ISSN 2204-9029
Ng, S T; Fan, R Y C and Wong, J M W (2011) An econometric model for forecasting private construction investment in Hong Kong. Construction Management and Economics, 29(5), pp. 519-534. ISSN 1466433X
Ng, S T; Mak, M M Y; Skitmore, R M; Lam, K C and Varnam, M (2001) The predictive ability of bromilow's time-cost model. Construction Management and Economics, 19(2), pp. 165-173. ISSN 01446193
Ng, S T and Zhang, Y (2008) Optimizing construction time and cost using ant colony optimization approach. Journal of Construction Engineering and Management, 134(9), pp. 721-728. ISSN 0733-9364
Ng, S T; Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(1), pp. 77-97. ISSN 1471-4175
Ngozwana, M N (2018) Career aspirations of construction TVET learners in South Africa. PhD thesis, University of Pretoria, South Africa.
Nguyen, M. V. and Do, X. S. (2026) Investigating key sources of work stress at Vietnamese architectural design firms. Journal of Engineering, Design and Technology, 24(6), pp. 1412-1434. ISSN 1726-0531
Nguyen, T; Elelu, K; Le, T and Le, C (2026) Enhancing auditory safety warnings in highway construction zones with loud noise using generative artificial intelligence. Journal of Construction Engineering and Management, 152(3): 04025283, ISSN 0733-9364
Nguyen, Anh Chi (2023) Risk allocation, decision rights, and adaptive lifecycle project management practices in public-private partnership highway contracts in Australia, the Philippines, and India. PhD thesis, Virginia Tech, USA.
Nguyen, D T; Doan, D T V; Tran, N N C and Tran, D H (2023) A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects. International Journal of Construction Management, 23(5), pp. 843-854. ISSN 1562-3599
Nguyen, Dinh Manh (2017) Maintenance practices: Improving sustainability performance of existing office buildings: An Australian case study. PhD thesis, University of Technology Sydney, Australia.
Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.
Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.
Nguyen, L D and Ibbs, W (2008) Flora: New forensic schedule analysis technique. Journal of Construction Engineering and Management, 134(7), pp. 483-491. ISSN 0733-9364
Nguyen, L D; Kneppers, J; García De Soto, B and Ibbs, W (2010) Analysis of adverse weather for excusable delays. Journal of Construction Engineering and Management, 136(12), pp. 1258-1267. ISSN 0733-9364
Nguyen, L D; Le-Hoai, L; Tran, D Q; Dang, C N and Nguyen, C V (2019) Effect of project complexity on cost and schedule performance in transportation projects. Construction Management and Economics, 37(7), pp. 384-399. ISSN 01446193
Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity a case of structural work. Engineering, Construction and Architectural Management, 20(6), pp. 563-575. ISSN 0969-9988
Nguyen, L D; Phan, D H and Tang, L C M (2013) Simulating construction duration for multistory buildings with controlling activities. Journal of Construction Engineering and Management, 139(8), pp. 951-959. ISSN 0733-9364
Nguyen, L d (2007) The dynamics of float, logic, resource allocation, and delay timing in forensic schedule analysis and construction delay claims. PhD thesis, University of California, Berkeley, USA.
Nguyen, P H D; Tran, D Q and Bypaneni, S P K (2021) Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways. Construction Management and Economics, 39(11), pp. 879-893. ISSN 01446193
Nguyen, T H D; Chileshe, N; Rameezdeen, R and Wood, A (2019) Stakeholder influence pathways in construction projects: Multicase study. Journal of Construction Engineering and Management, 145(9): 05019011, ISSN 0733-9364
Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364
Nguyen, Thinh Tan (2025) Accident data analytics and AI-based auditory enhancement for highway construction safety. PhD thesis, Clemson University, USA.
Nguyen, V T; Do, S T; Tran, C N N and Aung, Z M (2025) Developing a Bayesian belief network model for quantifying and predicting claim causes-related schedule delays. International Journal of Construction Management, 25(1), pp. 32-45. ISSN 1562-3599
Nicholls, C (2014) Energy use in non-domestic buildings: The UK government's new evidence base. Building Research & Information, 42(1), pp. 109-117. ISSN 0961-3218
Nickdoost, N; Choi, J; Abdelrazig, Y A and Sobanjo, J (2022) A project life-cycle approach to managing procrastination in construction projects: State-of-the-art review. Journal of Construction Engineering and Management, 148(5): 03122001, ISSN 0733-9364
Nidhin, B K S N; Domingo, N; Bui, T T P and Wilkinson, S (2025) Construction stakeholders' knowledge on zero carbon initiatives in New Zealand. International Journal of Building Pathology and Adaptation, 43(3), pp. 512-527. ISSN 2398-4708
Nielsen, S B; Hoffmann, B; Quitzau, M B and Elle, M (2009) Mobilizing the courage to implement sustainable design solutions: Danish experiences. Architectural Engineering and Design Management, 5(1-2), pp. 53-61. ISSN 1745-2007
Nieto-Morote, A and Ruz-Vila, F (2012) Last planner control system applied to a chemical plant construction. Journal of Construction Engineering and Management, 138(2), pp. 287-293. ISSN 0733-9364
Nikkhoo, P (2022) A systematic method to reduce the duration impact of change events on construction projects. PhD thesis, Stanford University, USA.
Nikolić, D (2011) Evaluating a simulation game in construction engineering education: The virtual construction simulator 3. PhD thesis, Pennsylvania State University, USA.
Ning, Y and Ling, F Y Y (2014) Boosting public construction project outcomes through relational transactions. Journal of Construction Engineering and Management, 140(1): 04013037, ISSN 0733-9364
Nishida, Y and Hua, Y (2011) Motivating stakeholders to deliver change: Tokyo's cap-and-trade program. Building Research & Information, 39(5), pp. 518-533. ISSN 0961-3218
Nishida, Y; Hua, Y and Okamoto, N (2016) Alternative building emission-reduction measure: Outcomes from the Tokyo cap-and-trade program. Building Research & Information, 44(5-6), pp. 644-659. ISSN 0961-3218
Niskanen, T and Lauttalammi, J (1989) Accident prevention in materials handling at building construction sites. Construction Management and Economics, 7(3), pp. 263-279. ISSN 01446193
Nkado, R N (1991) A construction time information system for the building industry. PhD thesis, University of Reading, UK.
Nkado, R N (1995) Construction time-influencing factors: The contractor's perspective. Construction Management and Economics, 13(1), pp. 81-89. ISSN 01446193
Nkado, R N (1992) Construction time information system for the building industry. Construction Management and Economics, 10(6), pp. 489-509. ISSN 01446193
Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Nnaji, C; Lee, H W; Karakhan, A and Gambatese, J (2018) Developing a decision-making framework to select safety technologies for highway construction. Journal of Construction Engineering and Management, 144(4): 04018016, ISSN 0733-9364
Nnedinma, U (2016) Approaches, drivers and motivators of health and safety self-regulation in the Nigerian construction industry: A scoping study. Architectural Engineering and Design Management, 12(6), pp. 460-475. ISSN 1745-2007
Noganta, A (2019) Key challenges faced by main contractors in coordinating the works of their subcontractors: A case study of kusile power station project. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Noor, I (1992) A study of the variability of labour productivity in building trades. PhD thesis, University of Dundee, UK.
Noor, R N H R M; Ibrahim, C K I C and Belayutham, S (2021) Making sense of multi-actor social collaboration in building information modelling Level 2 projects: A case in Malaysia. Construction Economics and Building, 21(4), pp. 89-114. ISSN 2204-9029
Noorian Talouki, R; Hosseini Shirvani, M and Motameni, H (2022) A hybrid meta-heuristic scheduler algorithm for optimization of workflow scheduling in cloud heterogeneous computing environment. Journal of Engineering, Design and Technology, 20(6), pp. 1581-1605. ISSN 1726-0531
Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.
Noruwa, B I; Arewa, A O and Merschbrock, C (2022) Effects of emerging technologies in minimising variations in construction projects in the UK. International Journal of Construction Management, 22(11), pp. 2199-2206. ISSN 1562-3599
Nosair, I A R (1987) The relevance of computerised modelling techniques to construction management problems and training in Egypt. PhD thesis, University of Manchester, UK.
Nosheen, A (2022) Development of an effective claim management framework for the UK construction industry. PhD thesis, Coventry University, UK.
Nouh, A; Elkasaby, E and Hussein, K (2023) Establishment of prediction system for cost of defect liability phase in construction project. Construction Innovation, 23(2), pp. 467-486. ISSN 1471-4175
Novak, V M; Fernandez-Anez, N and Shiraishi, K (2017) Rethinking resilience planning: From problems to potential. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 412-424. ISSN 1759-5916
Noyce, D A and Hanna, A S (1997) Planned schedule compression concept file for electrical contractors. Journal of Construction Engineering and Management, 123(2), pp. 189-197. ISSN 0733-9364
Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: The impact on labour. Construction Management and Economics, 16(1), pp. 79-90. ISSN 01446193
Noynaert, J M and Potangaroa, R (2018) Psychometric evaluation of disaster impact. International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 230-238. ISSN 1759-5916
Nuntasunti, S (2004) The effects of visual-based information logistics in construction. PhD thesis, North Carolina State University, USA.
Nuntasunti, S and Bernold, L E (2006) Experimental assessment of wireless construction technologies. Journal of Construction Engineering and Management, 132(9), pp. 1009-1018. ISSN 0733-9364
Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.
Nwadigo, O; Naismith, N N; Ghaffarianhoseini, A; Ghaffarian Hoseini, A and Tookey, J (2021) Dynamic Bayesian network modelling for predicting adaptability of time performance during time influencing factors disruptions in construction enterprise. Engineering, Construction and Architectural Management, 28(10), pp. 2994-3013. ISSN 0969-9988
Nwadigo, O B K; Naismith, N; GhaffarianHoseini, A; GhaffarianHoseini, A and Tookey, J (2022) Construction project planning and scheduling as a dynamic system: A content analysis of the current status, technologies and forward action. Smart and Sustainable Built Environment, 11(4), pp. 972-995. ISSN 2046-6099
Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165
Nyamagere Gladys, S; Rwelamila, P D and Gimbi, J J (2022) A conceptual framework for managing post-disaster reconstruction projects in emerging economies: The case of Angola. Built Environment Project and Asset Management, 12(2), pp. 205-222. ISSN 2044-124X
Nyando, C K and van Breda Strasheim, J A (2012) Assessing labour-based construction works management processes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 239-251. ISSN 17514312
Nyateka, N; Dainty, A R J; Gibb, A G and Phil Bust, P D (2012) Evaluating the role and effectiveness of training interventions in improving the occupational health and safety of younger construction workers: A literature review. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Nyqvist, Roope (2025) Data-driven transformation in construction management: From artificial intelligence to network modeling. PhD thesis, Aalto University, Finland.
Nyström, J (2008) A quasi-experimental evaluation of partnering. Construction Management and Economics, 26(5), pp. 531-541. ISSN 1466433X
O'Brien, P J (2007) Timely completion of school construction projects in Ohio as a function of compliance with contractual schedule development timelines. PhD thesis, Walden University, USA.
O'Connor, J T and El-Diraby, T E (2000) Urban freeway bridge reconstruction planning: Case of mockingbird bridge. Journal of Construction Engineering and Management, 126(1), pp. 61-67. ISSN 0733-9364
O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364
O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364
O'Shaughnessy, R D (1992) Criteria civil engineers use in deciding whether or not to participate in non-credit continuing engineering education programs. EdD thesis, University of Illinois at Urbana-Champaign, USA.
Obeng-Ahenkora, N. K.; Danso, H. and Kheni, N. A. (2026) Principal component analysis of factors influencing the choice of procurement methods for the procurement of construction materials in Ghana. Engineering, Construction and Architectural Management, 33(7), pp. 5300-5317. ISSN 0969-9988
Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.
Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Odeh, A M (1992) CIPROS: Knowledge-based construction integrated project and process planning simulation system. PhD thesis, University of Michigan, USA.
Odeh, I; El-Rayes, K and Liu, L (2009) Field experiments to evaluate and control light tower glare in nighttime work zones. Journal of Construction Engineering and Management, 135(9), pp. 911-919. ISSN 0733-9364
Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387
Odiba, E (2018) A model for effective quality management practices in construction organisations: The case of Nigeria. PhD thesis, Loughborough University, UK.
Odimabo, O (2016) Risk management system to guide building construction projects in developing countries: a case study of Nigeria. PhD thesis, University of Wolverhampton, UK.
Odubiyi, A O and Davidson, I E (2005) England and Wales electricity industry: experiences in deregulation. Journal of Engineering, Design and Technology, 3(1), pp. 24-29. ISSN 1726-0531
Oduori, M F; Mutuli, S M and Munyasi, D M (2015) Analysis of the single toggle jaw crusher kinematics. Journal of Engineering, Design and Technology, 13(2), pp. 213-239.
Ofori, G (1980) The construction industries of developing countries: the applicability of existing theories and strategies for their improvement and lessons for the future: the case of Ghana. PhD thesis, University College London, UK.
Ofori, G (1989) Housing in Singapore: Determinants of success and lessons for the developing countries. Construction Management and Economics, 7(2), pp. 137-153. ISSN 01446193
Ofori, G (1991) Programmes for improving the performance of contracting firms in developing countries: A review of approaches and appropriate options. Construction Management and Economics, 9(1), pp. 19-38. ISSN 01446193
Ofori, G (1996) International contractors and structural changes in host country construction industries: Case of Singapore. Engineering, Construction and Architectural Management, 3(4), pp. 271-288. ISSN 0969-9988
Ofori, G (2001) Indicators for measuring construction industry development in developing countries. Building Research & Information, 29(1), pp. 40-50. ISSN 0961-3218
Ofori, G (2007) Clients' role in attainment of sustainability in housing: The case of Singapore and lessons for developing countries. Journal of Construction in Developing Countries, 12(2), pp. 1-20. ISSN 1823-6499
Ofori, G (2015) Nature of the construction industry, its needs and its development: A review of four decades of research. Journal of Construction in Developing Countries, 20(2), pp. 115-135. ISSN 1823-6499
Ofori, G and Gang, G U (2001) ISO 9000 certification of Singapore construction enterprises: Its costs and benefits and its role in the development of the industry. Engineering, Construction and Architectural Management, 8(2), pp. 145-157. ISSN 0969-9988
Ofori-Boadu, A N; Bryant, D; Bock-Hyeng, C; Assefa, Z; Aryeetey, F; Munkaila, S and Fini, E (2022) Physiochemical characterization of agricultural waste biochars for partial cement replacement. International Journal of Building Pathology and Adaptation, 40(4), pp. 569-586. ISSN 23984708
Ofori-Boadu, A N; Shofoluwe, M A and Pyle, R (2017) Development of a housing eligibility assessment scoring method for low-income urgent repair programs. International Journal of Building Pathology and Adaptation, 35(3), pp. 194-217.
Ogbeifun, E; Mbohwa, C and Pretorius, J H C (2018) Developing an effective renovation plan: The influence of data collection tools. International Journal of Building Pathology and Adaptation, 36(1), pp. 63-76. ISSN 23984708
Ogbu, C P and Asuquo, C F (2019) Taxonomy of indigenous construction firms in South-South Nigeria. Journal of Construction in Developing Countries, 24(2), pp. 189-206. ISSN 1823-6499
Ogbu, C P and Olatunde, N (2019) Relationship between organisational effectiveness and project performance of SME contractors: A developing country perspective. Journal of Construction Business and Management, 3(2), pp. 1-16. ISSN 2521-0165
Ogunseiju, O; Olayiwola, J; Akanmu, A and Olatunji, O A (2022) Evaluation of postural-assist exoskeleton for manual material handling. Engineering, Construction and Architectural Management, 29(3), pp. 1358-1375. ISSN 0969-9988
Ogunseiju, O R; Olayiwola, J; Akanmu, A A and Nnaji, C (2022) Recognition of workers' actions from time-series signal images using deep convolutional neural network. Smart and Sustainable Built Environment, 11(4), pp. 812-831. ISSN 2046-6099
Ogunsemi, D R and Aje, I O (2006) A model for contractors' selection in Nigeria. Journal of Financial Management of Property and Construction, 11(1), pp. 33-44. ISSN 1366-4387
Ogunsemi, D R and Jagboro, G O (2006) Time-cost model for building projects in Nigeria. Construction Management and Economics, 24(3), pp. 253-258. ISSN 01446193
Ogwueleka, A C (2015) Evaluation of incentive mechanisms on performance-based contracting systems in South Africa and Nigeria. PhD thesis, University of Pretoria, South Africa.
Ohrn, G (2009) The influence of job-order-contracting as a construction project delivery method on owner satisfaction. PhD thesis, Indiana State University, USA.
Ojghaz, A S and Heravi, G (2026) An integrated BIM-GIS framework for building quality assessment based on price estimation: Evaluating design and location factors. Journal of Construction Engineering and Management, 152(4): 04026020, ISSN 0733-9364
Ojiako, G U (2005) Project failures: A comparative study of information and communication technologies (ICT) and construction projects. PhD thesis, University of Northumbria at Newcastle, UK.
Ojo, E O (2019) Project managers’ capacity-planning practices for infrastructure projects in qatar. PhD thesis, Walden University, USA.
Ojo, L D and Ogunsemi, D R (2019) Critical drivers (CDs) of value management adoption in the Nigerian construction industry: A Delphi study. Journal of Engineering, Design and Technology, 17(1), pp. 250-264. ISSN 1726-0531
Ojo, S O; Adeyemi, O Y and Ikpo, I J (2000) Effects of procurement methods on clients objectives of time and cost in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 5(1-2), pp. 105-108. ISSN 1366-4387
Okakpu, A I (2019) Investigating the effectiveness of adopting building information modelling for refurbishment of complex buildings: Case study of auckland. PhD thesis, Auckland University of Technology, New Zealand.
Oke, A. E.; Adekunye, O. J.; Adeosun, F. E.; Aliu, J.; Akanni, P. O.; Aghimien, D. and Aigbavboa, C. O. (2026) Assessment of the challenges of integrating cyber-physical systems in Nigerian construction. Engineering, Construction and Architectural Management, 33(4), pp. 3146-3163. ISSN 0969-9988
Oke, A; Omoraka, A and Olatunbode, A (2020) Appraisal of factors affecting bidding decisions in Nigeria. International Journal of Construction Management, 20(2), pp. 169-175. ISSN 1562-3599
Oke, A E; Ogunsemi, D R and Adeyelu, M F (2018) Quantity surveyors and skills required for procurement management. International Journal of Construction Management, 18(6), pp. 507-516. ISSN 1562-3599
Okeke, R.; Garuba, B. and Orji, F. (2025) The role of team temporal leadership in driving construction project success: A meta-analytical review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 82-107. ISSN 1751-4304
Okonkwo, C; Evans, U F and Ekung, S (2023) Unearthing direct and indirect material waste-related factors underpinning cost overruns in construction projects. International Journal of Construction Management, 23(13), pp. 2298-2304. ISSN 1562-3599
Okonta, U; Hosseinian-Far, A and Sarwar, D (2025) A systemic approach to sustainable railway infrastructure planning: The case study of milton keynes. Smart and Sustainable Built Environment, 14(2), pp. 407-428. ISSN 2046-6099
Okoroh, M I (2000) An evaluation of residential speculative developers' subcontractors perceived risks. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Okpala, D C and Aniekwu, A N (1988) Causes of high costs of construction in Nigeria. Journal of Construction Engineering and Management, 114(2), pp. 233-244. ISSN 0733-9364
Oladapo, A A (2007) A quantitative assessment of the cost and time impact of variation orders on construction projects. Journal of Engineering, Design and Technology, 5(1), pp. 35-48. ISSN 1726-0531
Oladimeji, O and Haddad, A N (2025) A systematic review of construction skills acquisition in higher education institutions. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(3), pp. 160-169. ISSN 17514304
Olaniran, O J (2015) The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction, 20(3), pp. 235-251. ISSN 1366-4387
Olanrewaju, A; Tan, Y Y and Soh, S N (2022) Defect characterisations in the Malaysian affordable housing. International Journal of Building Pathology and Adaptation, 40(4), pp. 539-568. ISSN 23984708
Olatokun, E O (2017) Requirement elicitation using knowledge capturing (kc) techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.
Olatokun, E O (2017) Requirement elicitation using knowledge capturing techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.
Olatunde, N. A.; Gento, A. M.; Awodele, I. A.; Adebayo, B. O.; Makanjuola, S. S. and Oyewo, O. W. (2026) Extent of specialized software usage in the delivery of quantity surveying services in South West Nigeria. International Journal of Building Pathology and Adaptation, 44(3), pp. 740-756. ISSN 2398-4708
Olatunde, N A and Alao, O O (2017) Quantitative appraisal of cost and time performance of construction projects in public and private universities in Osun State, Nigeria. Journal of Engineering, Design and Technology, 15(5), pp. 619-634.
Olatunde, N A; Awodele, I A and Adebayo, B O (2022) Impact of COVID-19 pandemic on indigenous contractors in a developing economy. Journal of Engineering, Design and Technology, 20(1), pp. 267-280. ISSN 1726-0531
Olatunde, N A; Ogunsemi, D R and Oke, A E (2017) Impact of team members' composition on construction projects delivery in selected higher institutions in Nigeria. Journal of Engineering, Design and Technology, 15(3), pp. 355-377.
Olatunji, O A; Rotimi, J O B; Rotimi, F E and Silva, C C W (2025) Causal relationship between project financing and overruns in major dam projects in Africa. Engineering, Construction and Architectural Management, 32(10), pp. 6480-6508. ISSN 0969-9988
Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), pp. 60-79. ISSN 1366-4387
Olatunji, O A; Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project's outturn costs. Built Environment Project and Asset Management, 8(4), pp. 358-371. ISSN 2044-124X
Olawale, Y (2015) The employability skills provision within a construction project management degree programme. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Olawale, Y A and Sun, M (2010) Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), pp. 509-526. ISSN 1466433X
Olayinka Agboola, A; Ayodele, T O and Olofa, A (2018) Tax increment financing in the UK and USA: Its prospects for urban regeneration in Nigeria. Smart and Sustainable Built Environment, 7(3-4), pp. 277-292. ISSN 2046-6099
Olbina, S (2008) Improving the delivery system for teaching the project planning and feasibility/site development course to building construction undergraduate students and real estate graduate students. International Journal of Construction Education and Research, 4(1), pp. 46-64. ISSN 1557-8771
Olbina, S; Hinze, J and Arduengo, C (2011) Drug testing practices in the US construction industry in 2008. Construction Management and Economics, 29(10), pp. 1043-1057. ISSN 01446193
Oleinik, P (2018) Method for creating a work management plan of a construction company. International Journal of Construction Management, 18(5), pp. 446-451. ISSN 1562-3599
Oliveira, Iberê Pinheiro de (2023) Criteria for building certification and assessment: An integrated approach to degradation and performance. PhD thesis, Universidade de Brasília, Brazil.
Oliveira, L A and Melhado, S B (2011) Conceptual model for the integrated design of building façades. Architectural Engineering and Design Management, 7(3), pp. 190-204. ISSN 1745-2007
Oliver, A and Pearl, D S (2018) Rethinking sustainability frameworks in neighbourhood projects: A process-based approach. Building Research & Information, 46(5), pp. 513-527. ISSN 0961-3218
Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364
Olivieri, H; Seppänen, O; Alves, T D C L; Scala, N M; Schiavone, V; Liu, M and Granja, A D (2019) Survey comparing critical path method, last planner system, and location-based techniques. Journal of Construction Engineering and Management, 145(12): 04019077, ISSN 0733-9364
Olivieri, H; Seppänen, O and Denis Granja, A (2018) Improving workflow and resource usage in construction schedules through location-based management system (LBMS). Construction Management and Economics, 36(2), pp. 109-124. ISSN 01446193
Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.
Oloke, D; Manase, D and Olomolaiye, P (2005) Construction health and safety (H&S) performance: A conceptual framework for enhancing information and communication technology (ICT) impacts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Oloke, D A; Edwards, D J and Thorpe, T A (2003) Predicting construction plant breakdown time using time series modelling. Journal of Engineering, Design and Technology, 1(2), pp. 202-221. ISSN 1726-0531
Olomolaiye, A and Egbu, C (2004) The significance of human resource issues in knowledge management within the construction industry: People, problems and possibilities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Olomolaiye, P O (1988) An evaluation of bricklayers' motivation and productivity. PhD thesis, Loughborough University, UK.
Olomolaiye, P O and Ogunlana, S O (1989) An evaluation of production outputs in key building trades in Nigeria. Construction Management and Economics, 7(1), pp. 75-86. ISSN 01446193
Olotuah, A O and Aiyetan, A O (2006) Sustainable low-cost housing provision in Nigeria: A bottom-up participatory approach. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Oloufa, A A; Eltahan, A A and Papacostas, C S (1994) Integrated GIS for construction site investigation. Journal of Construction Engineering and Management, 120(1), pp. 211-222. ISSN 0733-9364
Olowoake, M A O (2015) A theoretical framework to support facilities maintenance management of higher education institutions buildings in Nigeria. PhD thesis, University of Salford, UK.
Olugboyega, O (2019) Specific roles of builders in building information modelling processes. Journal of Construction in Developing Countries, 23(2), pp. 27-42. ISSN 1823-6499
Olugboyega, O; Ilesanmi, K E; Oseghale, G E and Aigbavboa, C (2024) The link between construction apps’ acceptance and digital attributes of construction professionals: Perspectives from digital competence model. Construction Innovation, 24(4), pp. 912-932. ISSN 1471-4175
Olugboyega, O and Windapo, A (2022) Investigating the strategic planning of BIM adoption on construction projects in a developing country. Journal of Construction in Developing Countries, 27(2), pp. 183-204. ISSN 1823-6499
Oluikpe, P (2007) Knowledge management in development projects. PhD thesis, Loughborough University, UK.
Oluleye, I B; Ogunleye, M B and Oyetunji, A K (2021) Evaluation of the critical success factors for sustainable housing delivery: Analytic hierarchy process approach. Journal of Engineering, Design and Technology, 19(5), pp. 1044-1062. ISSN 1726-0531
Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities. PhD thesis, University of the West of England, Bristol, UK.
Omar, H and Mahdjoubi, L (2023) Practical solutions for improving the suboptimal performance of construction projects using Dubai construction projects as an example. Engineering, Construction and Architectural Management, 30(6), pp. 2185-2205. ISSN 0969-9988
Omar, M R; Ayob, A; Zakaria, M H; Rahim, N S A; Mokhtar, H; Rani, H A and Rahman, F A (2023) Perspective of construction building professionals on low-carbon materials in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 139-162. ISSN 1823-6499
Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.
Ombwayo, J; Kidombo, H and Gakuu, C (2026) Moderating influence of stakeholder involvement on the relationship between project management lifecycle and performance of slum upgrading projects: A case of Nairobi city county, Kenya. International Journal of Construction Management, 26(1), pp. 1-11. ISSN 1562-3599
Omobhude, O C (2019) Inclusive policy making process for sustainable development: Empirical cases of oil and infrastructure sectors in Nigeria. PhD thesis, National Yang Ming Chiao Tung University, Taiwan R.O.C..
Omopariola, E D; Olugboyega, O; Windapo, A O and Albert, I (2022) Establishing the cost and time performances of projects executed by South African construction companies using different payment systems. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Omopariola, E D; Windapo, A; Edwards, D J and Thwala, W D (2020) Contractors’ perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology, 18(2), pp. 308-325. ISSN 1726-0531
Omopariola, E D and Windapo, A O (2019) Domino effect of timely payment of contractors on project and organisation performance. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Omotayo, T S; Danvers-Watson, O and Oyegoke, A S (2023) Subcontractor trust issues on payment and valuation practices in UK private projects. Journal of Financial Management of Property and Construction, 28(1), pp. 64-90. ISSN 1366-4387
Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.
Ong, H C (2003) A new model of public private partnerships for affordable housing in Malaysia. PhD thesis, University of Salford, UK.
Ong, H Y; Wang, C and Zainon, N (2018) Developing a quality-embedded EVM tool to facilitate the iron triangle in architectural, construction, and engineering practices. Journal of Construction Engineering and Management, 144(9): 04018079, ISSN 0733-9364
Onubi, H O; Yusof, N; Hassan, A S and Bahdad, A A S (2023) Forecasting the schedule performance resulting from the adoption of social distancing in construction projects. Engineering, Construction and Architectural Management, 30(8), pp. 3731-3748. ISSN 0969-9988
Onukwube, H N (2012) Leader influences on training effectiveness of construction professionals: The case of Nigeria. Journal of Construction in Developing Countries, 17(2), pp. 67-79. ISSN 1823-6499
Onukwugha, V C (1991) Optimising the constructional and technological aspects of management for mass housing schemes in Nigeria. PhD thesis, University of Lagos, Nigeria.
Onyia, U (2019) Improving the supervisory and managerial skills and competences required in construction management in Nigeria. PhD thesis, London South Bank University, UK.
Onyido, T B C; Boyd, D and Thurairajah, N (2016) Developing SMEs as environmental businesses. Construction Innovation, 16(1), pp. 30-45. ISSN 1471-4175
Oo, B L; Lim, T H B and Zhang, Y (2021) Women workforce in construction during the COVID-19 pandemic: Challenges and strategies. Construction Economics and Building, 21(4), pp. 38-59. ISSN 2204-9029
Opdyke, A.; Latiph, A. A.; Shrief, M. C. and Yape, E. (2026) Displacement, infrastructure deficits and public health risks in post-conflict marawi during the COVID-19 pandemic. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 297-313. ISSN 1759-5908
Ophiyandri, T (2013) Project risk management for community-based post-disaster housing reconstruction. PhD thesis, University of Salford, UK.
Ophiyandri, T; Amaratunga, D; Pathirage, C and Keraminiyage, K (2013) Critical success factors for community-based post-disaster housing reconstruction projects in the pre-construction stage in Indonesia. International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 236-249. ISSN 1759-5916
Opoku, R A (2026) Antecedents of construction project time overrun in ghana's public sector: The moderating role of political connection. International Journal of Construction Management, 26(4), pp. 537-560. ISSN 1562-3599
Opoku, A and Ahmed, V (2014) Embracing sustainability practices in UK construction organizations: Challenges facing intra-organizational leadership. Built Environment Project and Asset Management, 4(1), pp. 90-107. ISSN 2044-124X
Opoku, A; Tallon, A; Lok, K L; Chen, C X L and Umar, T (2020) Realising project benefits in the public sector: Project sponsor's perspective. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(1), pp. 7-13. ISSN 17514304
Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Oraee, M; Hosseini, M R; Edwards, D and Papadonikolaki, E (2022) Collaboration in BIM-based construction networks: A qualitative model of influential factors. Engineering, Construction and Architectural Management, 29(3), pp. 1194-1217. ISSN 0969-9988
Orczyk, J J (1989) Parametric construction scheduling. PhD thesis, Purdue University, USA.
Ordonez Arizaga, J F (2007) A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment. PhD thesis, University of Maryland, College Park, USA.
Orero, E (2019) Exploring options in infrastructure financing in Africa: steering of public private partnerships (PPPs) in Kenya. PhD thesis, Royal Holloway, University of London, UK.
Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry. PhD thesis, North Carolina State University, USA.
Orgut, R E; Zhu, J; Batouli, M; Mostafavi, A and Jaselskis, E J (2018) Metrics that matter: Core predictive and diagnostic metrics for improved project controls and analytics. Journal of Construction Engineering and Management, 144(11): 04018100, ISSN 0733-9364
Ormeño Zender, Y and García de Soto, B (2021) Use of scrum in the rehabilitation of a commercial building in Peru. Construction Innovation, 21(2), pp. 145-163. ISSN 1471-4175
Osadare, A F (2022) Relationship between cost, schedule overruns, and project success in the nuclear construction industry in the United Kingdom. PhD thesis, Walden University, USA.
Osama, M; Sherif, A and Badawy, M (2023) Risk analysis of construction of administration projects using Bayesian networks. Journal of Engineering, Design and Technology, 21(1), pp. 281-298. ISSN 1726-0531
Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387
Oshin-Martin, M (2014) Managing beyond the contract: Communicating and connecting to build sustainable collaborative relationships in international public-private partnerships. DM thesis, University of Maryland University College, USA.
Osman, H M and El-Diraby, T E (2011) Knowledge-enabled decision support system for routing urban utilities. Journal of Construction Engineering and Management, 137(3), pp. 198-213. ISSN 0733-9364
Osman, I A (2022) Impacts of global pandemics on construction projects and dispute resolution provisions. PhD thesis, University of Illinois at Chicago, USA.
Osman, K K; Claveria, J B; Faust, K M and Hernandez, S (2019) Temporal dynamics of willingness to pay for alternatives that increase the reliability of water and wastewater service. Journal of Construction Engineering and Management, 145(7): 04019041, ISSN 0733-9364
Osmani, M (2015) Integration of waste minimisation strategies into the design process of buildings. PhD thesis, Loughborough University, UK.
Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure. PhD thesis, University of California, Davis, USA.
Osuizugbo, I. C.; Oyeyipo, O. O.; Ojelabi, R. A. and Oshodi, O. S. (2021) Factors inhibiting corporate social responsibility initiatives among construction companies. Construction Economics and Building, 21(1), pp. 83-99. ISSN 2204-9029
Osuizugbo, I C (2021) The need for and benefits of buildability analysis: Nigeria as a case study. Journal of Engineering, Design and Technology, 19(5), pp. 1207-1230. ISSN 1726-0531
Osuizugbo, I C and Adenuga, O A (2024) Decisive factors for decision-making to achieving sustainable procurement in construction projects. International Journal of Building Pathology and Adaptation, 42(6), pp. 1185-1202. ISSN 2398-4708
Osuizugbo, I C; Fauzi, M A; Omer, M M; Njogo, B O and Orekan, A A (2024) Research trends on early contractor involvement in construction projects: A bibliometric analysis. Construction Economics and Building, 24(4-5), pp. 160-178. ISSN 2204-9029
Osuizugbo, I C; Kukoyi, P O; Abisuga, A O and Ibrahim, K (2023) Choosing to be a craftsperson: Factors influencing career decision-making among apprentices. Engineering, Construction and Architectural Management, 30(5), pp. 2026-2047. ISSN 0969-9988
Osuizugbo, I C; Kukoyi, P O; Aluko, R O and Akindele, N A (2022) Determinants of successful completion of construction craft apprenticeship in Lagos state, Nigeria: A qualitative study. Journal of Construction in Developing Countries, 27(2), pp. 163-182. ISSN 1823-6499
Osuizugbo, I C; Okolie, K C and Oshodi, O S (2024) Factors supporting the implementation of buildability assessment as a tool for buildability improvement. Journal of Engineering, Design and Technology, 22(3), pp. 879-900. ISSN 1726-0531
Osuizugbo, I C; Okolie, K C and Oyeyipo, O O (2023) Factors influencing buildability assessment implementation in the Nigerian construction industry. Construction Innovation, 23(5), pp. 917-938. ISSN 1471-4175
Oswald, D; Sherratt, F and Smith, S (2019) Managing production pressures through dangerous informality: A case study. Engineering, Construction and Architectural Management, 26(11), pp. 2581-2596. ISSN 0969-9988
Oswald, T H (1995) A model for using quality function deployment in engineering project development. PhD thesis, Clemson University, USA.
Othman, A A; Torrance, J V and Hamid, M A (2006) Factors influencing the construction time of civil engineering projects in Malaysia. Engineering, Construction and Architectural Management, 13(5), pp. 481-501. ISSN 0969-9988
Othman, A A E (2013) Investigating the competency of property development graduates towards satisfying the requirements of the construction industry in South Africa: The case of the University of KwaZulu-Natal. International Journal of Construction Management, 13(4), pp. 75-102. ISSN 1562-3599
Othman, A A E (2014) A study of the competency requirements of property development graduates to meet the qualifications of the South African construction industry. Journal of Engineering, Design and Technology, 12(1), pp. 2-28. ISSN 1726-0531
Oti-Sarpong, K (2019) Examining international technology transfer on construction projects in developing countries through a social construction of technology lens. PhD thesis, University of Hong Kong, Hong Kong.
Oti-Sarpong, K and Burgess, G (2020) Offsite manufacturing and construction industry transformation: A multi-level sociotechnical transitions perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599
Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.
Otto, H T (1985) The economics of the construction sector of the ussr. PhD thesis, University of Houston, USA.
Ouga, A D; Alinaitwe, H M and Mwesige, G (2020) Modelling block laying productivity on building sites in Kampala. Journal of Construction in Developing Countries, 25(1), pp. 109-128. ISSN 1823-6499
Oussadou, A (1988) Residential satisfaction in the new urban housing projects in Algeria: a case study of Ain-Allah, Algiers. PhD thesis, University of Nottingham, UK.
Outhred, G (2007) Learning for undergraduate built environment students: Project based activities, problem solving and role: Playing for a complete experiential education. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Ovararin, N (2001) Quantifying productivity loss due to field disruptions in masonry construction. PhD thesis, University of Texas at Austin, USA.
Ovbiagbonhia, A R (2021) Learning to innovate: How to foster innovation competence in students of built environment at universities of applied sciences. PhD thesis, Wageningen University and Research, Netherlands.
Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study. PhD thesis, University of Maryland, College Park, USA.
Oyediran, H (2025) Robot-integrated 4D building information modeling (4D BIM): Framework for planning safe autonomous construction operations in dynamic environments. PhD thesis, University of Nebraska - Lincoln, USA.
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988
Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2024) Development of Adapt-ABLE smart system: An end-to-end system for speeding up disabled housing adaptation process. International Journal of Building Pathology and Adaptation, 42(4), pp. 531-552. ISSN 23984708
Oyegoke, A S and Al Kiyumi, N (2017) The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction, 22(3), pp. 286-302. ISSN 1366-4387
Oyemomi, B; Hare, B and Tong, M (2016) Exploring human resource incentivisation for public sector construction project delivery in Scotland. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Oyemomi, B; Hare, B and Tong, M (2018) Exploring public-private partnership challenges and the effects on the construction workforce: A Scotland study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Oyewobi, L; Okanlawon, T T; Ibrahim, K and Jimoh, R A (2025) Influence of blockchain adoption barriers and drivers on potential application areas in the construction lifecycle: Partial least squares structural equation modelling (PLS-SEM) approach. Engineering, Construction and Architectural Management, 32(3), pp. 1798-1815. ISSN 0969-9988
Oyewole, E O and Dada, J O (2019) Training gaps in the adoption of building information modelling by Nigerian construction professionals. Built Environment Project and Asset Management, 9(3), pp. 399-411. ISSN 2044-124X
Ozols, R and Fortune, C (2012) Towards the identification of factors affecting the development of small sized construction contacting organisations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ozols, R S (2015) A strategic framework to aid the success of small and micro sized UK construction contractors. DProf thesis, University of Salford, UK.
Oztas, A (1995) The mitigation of the effects of delays in construction projects: A knowledge based system approach. PhD thesis, University of Manchester, UK.
O’Brien, J J; Kreitzberg, F C and Mikes, W F (1985) Network scheduling variations for repetitive work. Journal of Construction Engineering and Management, 111(2), pp. 105-116. ISSN 0733-9364
O’Connor, J T (1985) Impacts of constructability improvement. Journal of Construction Engineering and Management, 111(4), pp. 404-410. ISSN 0733-9364
Pace, C B (1999) A factor-based three dimensional model of the process of new technology development in the construction engineering industry. PhD thesis, University of California, Berkeley, USA.
Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387
Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Padilla, E M and Carr, R I (1991) Resource strategies for dynamic project management. Journal of Construction Engineering and Management, 117(2), pp. 279-293. ISSN 0733-9364
Paek, J H and Ock, J H (1996) Innovative building construction technique: Modified up/down method. Journal of Construction Engineering and Management, 122(2), pp. 141-146. ISSN 0733-9364
Pagdadis, S (1990) An advanced technologies assessment strategy for construction automation. PhD thesis, University of Texas at Austin, USA.
Pahwa, J S (2009) MDSSF: a federated architecture for product procurement. PhD thesis, Cardiff University, UK.
Painting, N; Ashton, P and Gidado, K (2004) PFI in south aast England secondary schools: A school manager's perspective. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.
Pakkala, T A; Köliö, A; Lahdensivu, J and Pentti, M (2019) Predicted corrosion rate on outdoor exposed concrete structures. International Journal of Building Pathology and Adaptation, 37(5), pp. 679-698. ISSN 23984708
Pal, A.; Lin, J. J.; Amer, F.; Hsieh, S. H. and Golparvar Fard, M. (2026) Automatic mapping of schedule activities and reality models for tracking construction progress. Engineering, Construction and Architectural Management, 33(3), pp. 1932-1958. ISSN 0969-9988
Palaneeswaran, E; Love, P E D; Kumaraswamy, M M and Ng, T S T (2008) Mapping rework causes and effects using artificial neural networks. Building Research & Information, 36(5), pp. 450-465. ISSN 0961-3218
Palit, N (2017) Analysis of the project supply chains: coordination and fair allocation. PhD thesis, University of Sheffield, UK.
Pall, G K; Bridge, A J; Washington, S; Gray, J and Skitmore, M (2022) Critical delay factors in power transmission projects: A structural equation modeling approach. International Journal of Construction Management, 22(6), pp. 1158-1170. ISSN 1562-3599
Palliyaguru, R; Amaratunga, D and Haigh, R (2010) Integration of "disaster risk reduction" into infrastructure reconstruction sector: Policy vs practise gaps. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 277-296. ISSN 1759-5916
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. PhD thesis, Loughborough University, UK.
Pan, W; Gibb, A F and Dainty, A R J (2007) Perspective of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), pp. 183-194. ISSN 1466433X
Pan, W; Gibb, A G F and Dainty, A R J (2008) Leading UK housebuilders' utilization of offsite construction methods. Building Research & Information, 36(1), pp. 56-67. ISSN 0961-3218
Pan, W; Sidwell, R and Soetanto, R (2009) A longitudinal investigation into utilising crosswall construction for multi-storey residential buildings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Pan, W; Yang, Y and Pan, M (2023) Implementing modular integrated construction in high-rise high-density cities: Perspectives in Hong Kong. Building Research & Information, 51(3), pp. 354-368. ISSN 0961-3218
Panas, A; Pantouvakis, J P and Edum-Fotwe, F T (2005) Potential for using process approach to manage construction projects in Greece. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Pancholi, J and Devkar, D G (2023) Analyzing the influence of organizational culture in projects using Last Planner System. Construction Economics and Building, 23(3-4), pp. 143-169. ISSN 2204-9029
Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.
Pandithawatta, T P W S I; Zainudeen, N and Perera, C S R (2020) An integrated approach of lean-green construction: Sri Lankan perspective. Built Environment Project and Asset Management, 10(2), pp. 200-214. ISSN 2044-124X
Pantzartzis, E; Price, A D F and Pascale, F (2016) A built environment response to the rising costs of dementia. Journal of Financial Management of Property and Construction, 21(2), pp. 160-187. ISSN 1366-4387
Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Panwar, A and Jha, K N (2019) A many-objective optimization model for construction scheduling. Construction Management and Economics, 37(12), pp. 727-739. ISSN 01446193
Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364
Panwar, A; Tripathi, K K and Jha, K N (2019) A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 1924-1945. ISSN 0969-9988
Panzeter, A A (1993) A methodology for modeling the cost and duration of concrete highway bridges. PhD thesis, Purdue University, USA.
Papadonikolaki, E and van Oel, C (2016) The actors' perceptions and expectations of their roles in BIM-based collaboration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Paquin, J P; Morin, P P; Lambert, A and Koplyay, T (2022) Assessing project contingency reserves with the expected cost overrun risk measure. Journal of Construction Engineering and Management, 148(10): 04022102, ISSN 0733-9364
Pararajasingam, R; Waidyasekara, A S and Victar, H C (2026) Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka. Construction Innovation, 26(1), pp. 22-43. ISSN 1471-4175
Parchami, J M and Shoar, S (2017) A hybrid SD-DEMATEL approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management, 24(4), pp. 629-651. ISSN 0969-9988
Parchami Jalal, M and Shoar, S (2019) A hybrid framework to model factors affecting construction labour productivity: Case study of Iran. Journal of Financial Management of Property and Construction, 24(3), pp. 630-654. ISSN 1366-4387
Pareek, P; Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(1), pp. 54-66. ISSN 1562-3599
Park, H-K (2001) Cash flow forecasting model using moving weights of cost categories for general contractor on jobsite. PhD thesis, University of Wisconsin - Madison, USA.
Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.
Park, J; Cai, H; Dunston, P S and Ghasemkhani, H (2017) Database-supported and web-based visualization for daily 4D BIM. Journal of Construction Engineering and Management, 143(10): 04017078, ISSN 0733-9364
Park, J; Kim, K and Cho, Y K (2017) Framework of automated construction-safety monitoring using cloud-enabled BIM and BLE mobile tracking sensors. Journal of Construction Engineering and Management, 143(2): 05016019, ISSN 0733-9364
Park, J; Marks, E; Cho, Y K and Suryanto, W (2016) Performance test of wireless technologies for personnel and equipment proximity sensing in work zones. Journal of Construction Engineering and Management, 142(1): 04015049, ISSN 0733-9364
Park, M (2001) Dynamic planning and control methodology for large-scale concurrent construction projects. PhD thesis, Massachusetts Institute of Technology, USA.
Park, M; Ji, S H; Lee, H S and Kim, W (2009) Strategies for design-build in Korea using system dynamics modeling. Journal of Construction Engineering and Management, 135(11), pp. 1125-1137. ISSN 0733-9364
Park, M and Peña-Mora, F (2004) Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5), pp. 626-637. ISSN 0733-9364
Park, M-W (2012) Automated 3D vision-based tracking of construction entities. PhD thesis, Georgia Institute of Technology, USA.
Parry, A (2015) The improvement of delay analysis in the UK construction industry. PhD thesis, Northumbria University, UK.
Parsi, M; Baradaran, V and Hosseinian, A H (2025) Integrating the stochastic multiproject scheduling and material ordering problems for offshore projects: Multiagent optimization methodology. Engineering, Construction and Architectural Management, 32(4), pp. 2614-2645. ISSN 0969-9988
Parvan, K (2012) Estimating the impact of building information modeling (BIM) utilization on building project performance. PhD thesis, University of Maryland, College Park, USA.
Pascale, F; Pantzartzis, E; Krystallis, I and Price, A D F (2020) Rationales and practices for dynamic stakeholder engagement and disengagement. Evidence from dementia-friendly health and social care environments. Construction Management and Economics, 38(7), pp. 623-639. ISSN 01446193
Pasiphol, S (1994) New concepts for total float distribution in CPM project scheduling. PhD thesis, University of Texas at Austin, USA.
Pasquire, C L and Gibb, A G F (2002) Considerations for assessing the benefits of standardisation and pre-assembly in construction. Journal of Financial Management of Property and Construction, 7(3), pp. 151-162. ISSN 1366-4387
Patel, T.; Guo, B. H. W.; van der Walt, J. D. and Bapat, H. (2026) Vision-based automated road construction progress monitoring: Improved u-net segmentation approach. International Journal of Construction Management, 26(10), pp. 2154-2175. ISSN 1562-3599
Patel, T; Guo, B H W; van der Walt, J D and Zou, Y (2025) Unmanned ground vehicle (ugv) based automated construction progress measurement of road using LSTM. Engineering, Construction and Architectural Management, 32(9), pp. 5764-5791. ISSN 0969-9988
Patel, M; Sherratt, F and Farrell, P (2012) Exploring human error through the safety talk of utilities distribution operatives. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531
Paterson, Ian (1981) Contractors' risk and insurance in the Australian building industry. PhD thesis, University of New South Wales, Australia.
Pathirage, C; Seneviratne, K; Amaratunga, D and Haigh, R (2012) Managing disaster knowledge: Identification of knowledge factors and challenges. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 237-252. ISSN 1759-5916
Patil, N A and Laishram, B S (2016) Sustainability of Indian PPP procurement process: Development of strategies for enhancement. Built Environment Project and Asset Management, 6(5), pp. 491-507. ISSN 2044-124X
Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.
Patsiatzis, Dimitrios I (2003) Optimal process plant layout using mathematical programming. PhD thesis, University College London, UK.
Patterson, D A; Farnsworth, C B; Hutchings, D M; Eggett, D L and Weidman, J E (2023) Comparing cost, schedule, and quality of CM/GC and DBB project delivery for repetitive commercial construction. International Journal of Construction Education and Research, 19(2), pp. 166-186. ISSN 1557-8771
Patterson, M R (2017) Skin fit and retrofit: Challenging the sustainability of curtainwall practice in tall buildings. PhD thesis, University of Southern California, USA.
Paul, B; Cattell, K; Edwards, P J and Marks, J (2010) Perceptions of HIV/AIDS policies and treatment programmes by Western Cape construction firms. Construction Management and Economics, 28(9), pp. 997-1006. ISSN 1466433X
Paul, C A; Aghimien, D O; Ibrahim, A D and Ibrahim, Y M (2021) Measures for curbing unethical practices among construction industry professionals: Quantity surveyors' perspective. Construction Economics and Building, 21(2), pp. 1-17. ISSN 2204-9029
Paulson, B C; Beisman, G H; Bell, L C; Bjornsson, H C; Bowerman, M D; Carr, R I; Coppi, D F; Crandall, K C; DeLong, C E; Halpin, D W; Hogg, P; Levin, P; Lluch, J F; Logcher, R D; Melin, J W; Moore, W C; Mueller, F W; Nowak, J A; O'Connor, M J; Pinnell, S S; Sears, G A; Stark, R M; Stevens, J D; Tarkoy, P J and Youngs, J R (1985) Application of small computers in construction. Journal of Construction Engineering and Management, 111(3), pp. 173-189. ISSN 0733-9364
Paulson, B C; Chan, W T and Koo, C C (1987) Construction operations simulation by microcomputer. Journal of Construction Engineering and Management, 113(2), pp. 302-314. ISSN 0733-9364
Pavitt, T C (2002) Managing construction interfaces within the building facade. PhD thesis, Loughborough University, UK.
Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364
Payne, B (1998) Project risk analysis. PhD thesis, Nottingham Trent University, UK.
Paz, J C; Rozenboim, D; Cuadros, Á; Cano, S and Escobar, J W (2018) A simulation-based scheduling methodology for construction projects considering the potential impacts of delay risks. Construction Economics and Building, 18(2), pp. 41-69. ISSN 2204-9029
Peansupap, V and Walker, D H T (2009) Exploratory factors influencing design practice learning within a Thai context. Engineering, Construction and Architectural Management, 16(3), pp. 238-253. ISSN 0969-9988
Pearson, J (2014) Effective employer engagement in full time construction-related foundation degrees, with particular emphasis on workplace learning. PhD thesis, Northumbria University, UK.
Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988
Pekkonen, M; Turunen, M and Haverinen-Shaughnessy, U (2018) Housing quality perceptions in Finland: The elderly population. Building Research & Information, 46(4), pp. 417-429. ISSN 0961-3218
Peltokorpi, A; Olivieri, H; Granja, A D and Seppänen, O (2018) Categorizing modularization strategies to achieve various objectives of building investments. Construction Management and Economics, 36(1), pp. 32-48. ISSN 01446193
Pena-Mora, F and Park, M (2001) Dynamic planning for fast-tracking building construction projects. Journal of Construction Engineering and Management, 127(6), pp. 445-456. ISSN 0733-9364
Pendlebury, M C (2000) Techniques and strategies to improve conceptual and schematic design. PhD thesis, Loughborough University, UK.
Peng, L.; Yang, H.; Ju, A.; Li, X. and Jiang, Z. (2026) Data-driven real-time digital twin framework for tunnel boring machine monitoring. Journal of Construction Engineering and Management, 152(9): 04026134, ISSN 0733-9364
Peng, J and Liu, X J (2024) Labor resource allocation under extremely short construction period based on the inverse optimization method. Engineering, Construction and Architectural Management, 31(3), pp. 1254-1271. ISSN 0969-9988
Peng, M (2012) Dam risk analysis and dynamic decision making. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Pepper, C; Dainty, A R J; Bagilhole, B M and Gibb, A G F (2002) Diversity: A driver of business improvement within the UK construction sector? In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.
Pereira, Ana Paula Carvalho (2017) Building information modeling in the project phase: A proposal for a BIM execution plan for SUMAI / UFBA. PhD thesis, Universidade Federal da Bahia, Brazil.
Pereira, E; Hermann, U; Han, S and Abourizk, S (2018) Case-based reasoning approach for assessing safety performance using safety-related measures. Journal of Construction Engineering and Management, 144(9): 04018088, ISSN 0733-9364
Perera, C. S. R.; Francis, V. and Gao, S. (2026) Uptake of industry 4.0 technologies in Australian construction firms. Engineering, Construction and Architectural Management, 33(3), pp. 2071-2088. ISSN 0969-9988
Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS accesstm and MS projecttm. Construction Management and Economics, 22(2), pp. 203-211. ISSN 01446193
Perera, B A K S; Ekanayake, B J; Jayalath, C and Jayathilaka, G R H (2021) A study on variation-specific disputes that arise in road projects in Sri Lanka: A qualitative approach. International Journal of Construction Management, 21(6), pp. 571-581. ISSN 1562-3599
Perera, B A K S; Sirimewan, D C and Senadeera, A D (2021) Management of variations in the public-sector building construction projects in Sri Lanka. Journal of Engineering, Design and Technology, 19(6), pp. 1601-1619. ISSN 1726-0531
Perera, B A K S; Wijewickrama, M K C S; Goonawardana, P J A and Jayalath, C (2021) Improving the efficacy of delay notification process of construction projects in Sri Lanka. International Journal of Construction Management, 21(7), pp. 755-768. ISSN 1562-3599
Perera, B A K S; Wijewickrama, M K C S; Ranaweera, W R S C and Gamage, I S W (2021) Significant factors influencing the bid mark-up decision of infrastructure projects in Sri Lanka. International Journal of Construction Management, 21(8), pp. 769-783. ISSN 1562-3599
Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of last planner system®: A case study. Engineering, Construction and Architectural Management, 25(9), pp. 1110-1126. ISSN 0969-9988
Perkinson, G M; Sanvido, V E and Grobler, F (1994) A facility programming information framework. Engineering, Construction and Architectural Management, 1(1), pp. 69-84. ISSN 0969-9988
Perovic, Miljenka (2015) Overcoming the challenges of building heritage projects: Improvements to time, scope and cost performance. PhD thesis, Queensland University of Technology, Australia.
Perrenoud, A J and Sullivan, K T (2017) Analysis of executive succession planning in 12 construction companies. International Journal of Construction Education and Research, 13(1), pp. 64-80. ISSN 1557-8771
Perrin, R and Price, A D F (2004) Developing teams and the allocation of rewards within a team environment. Journal of Construction Procurement, 10(2),
Perry, M J (1997) Distributed cognition and computer supported collaborative design: The organisation of work in construction engineering. PhD thesis, Brunel University, UK.
Persad, K R (1989) Management of the preconstruction process for highway projects using manpower demand prediction models. PhD thesis, University of Texas at Austin, USA.
Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599
Pettit, J H (2000) Clients: their role in the procurement of infrastructure projects. PhD thesis, Loughborough University, UK.
Pewdum, W; Rujirayanyong, T and Sooksatra, V (2009) Forecasting final budget and duration of highway construction projects. Engineering, Construction and Architectural Management, 16(6), pp. 544-557. ISSN 0969-9988
Peña-Mora, F; Han, S; Lee, S and Park, M (2008) Strategic-operational construction management: Hybrid system dynamics and discrete event approach. Journal of Construction Engineering and Management, 134(9), pp. 701-710. ISSN 0733-9364
Peña-Mora, F and Li, M (2001) Dynamic planning and control methodology for design/build fast-track construction projects. Journal of Construction Engineering and Management, 127(1), pp. 1-17. ISSN 0733-9364
Pheng, L S; Arain, F M and Fang, J W Y (2011) Applying just-in-time principles in the delivery and management of airport terminal buildings. Built Environment Project and Asset Management, 1(1), pp. 104-121. ISSN 2044-124X
Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(2), pp. 67-81. ISSN 0961-3218
Phillips, H C (2009) A proposed method to determine confidence in a construction schedule. PhD thesis, University of New Mexico, USA.
Phua, F (2006) Examining the effects of senior executives' perceived environmental uncertainty on the strategic functions of construction firms. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Pieterse, B; Agyekum, K; Manu, P; Mohandes, S R; Cheung, C and Yunusa-Kaltungo, A (2024) Examining critical project management skills for successful delivery of major maintenance projects: Insights from the United Kingdom energy sector. Engineering, Construction and Architectural Management, 31(4), pp. 1556-1584. ISSN 0969-9988
Pim-Wusu, M.; Gyamfi, T. A.; Thwala, W. D. and Aigbavboa, C. O. (2026) Influence of education and training on sustainable construction adaptive capacity in the construction industry. Construction Economics and Building, 26(2), ISSN 2204-9029
Pinheiro Catalão, F; Cruz, C O and Miranda Sarmento, J (2019) Exogenous determinants of cost deviations and overruns in local infrastructure projects. Construction Management and Economics, 37(12), pp. 697-711. ISSN 01446193
Pinto Langoni, C R (1987) A decomposition approach for the project scheduling problem (network analysis). PhD thesis, Texas A&M University, USA.
Pishdad-Bozorgi, P; De La Garza, J M and Austin, R B (2016) Readiness assessment for flash tracking. Journal of Construction Engineering and Management, 142(12): 06016005, ISSN 0733-9364
Platt, R T (1998) Development of a ready-to-assemble construction system. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Plotnick, F L (2008) Rdm: Relationship diagramming method. PhD thesis, Drexel University, USA.
Plugge, P W (2007) An evidence-based comparison of construction project delivery. PhD thesis, Colorado State University, USA.
Pocock, J B (1996) The relationship between alternative project approaches, integration, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Pocock, J B; Hyun, C T; Liu, L Y and Kim, M K (1996) Relationship between project interaction and performance indicators. Journal of Construction Engineering and Management, 122(2), pp. 165-176. ISSN 0733-9364
Pocock, J B; Liu, L Y and Kim, M K (1997) Impact of management approach on project interaction and performance. Journal of Construction Engineering and Management, 123(4), pp. 411-418. ISSN 0733-9364
Poh, Y P (2005) Knowledge-based integrated project duration-cost risk simulation model. PhD thesis, London South Bank University, UK.
Poh, Y P and Tah, J H M (2006) Integrated duration-cost influence network for modelling risk impacts on construction tasks. Construction Management and Economics, 24(8), pp. 861-868. ISSN 1466433X
Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364
Poleacovschi, C; Javernick-Will, A and Tong, T (2017) The link between knowledge sharing connections and employee time savings: A social network analysis. Construction Management and Economics, 35(8-9), pp. 455-467. ISSN 01446193
Pomares, J C; Irles, R; Segovia, E and Ferrer, B (2014) Acceleration and deflection analysis for class C edge protection systems in construction work. Journal of Construction Engineering and Management, 140(8): 04014031, ISSN 0733-9364
Pooladvand, S; Taghaddos, H; Eslami, A; Nekouvaght Tak, A and Hermann, U (2021) Evaluating mobile crane lift operations using an interactive virtual reality system. Journal of Construction Engineering and Management, 147(11): 04021154, ISSN 0733-9364
Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.
Porter, K A (2000) Assembly-based vulnerability of buildings and its uses in seismic performance evaluation and risk-management decision-making. PhD thesis, Stanford University, USA.
Poshdar, M; González, V A; Raftery, G M and Orozco, F (2014) Characterization of process variability in construction. Journal of Construction Engineering and Management, 140(11): 5014009, ISSN 0733-9364
Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364
Posillico, J J (2023) Development of an interpersonally grounded construction management curriculum foundation model. PhD thesis, Birmingham City University, UK.
Posillico, J J; Edwards, D J; Roberts, C and Shelbourn, M (2023) A conceptual construction management curriculum model grounded in scientometric analysis. Engineering, Construction and Architectural Management, 30(9), pp. 4143-4170. ISSN 0969-9988
Potts, K (2009) Construction during World War II: Management and financial administration. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Potts, K F (1988) An alternative payment system for major 'fast track' construction projects. Construction Management and Economics, 6(1), pp. 25-33. ISSN 01446193
Potts, M; McDermott, P and Stephenson, A (2016) A systems approach to strategic infrastructure delivery. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 95-105. ISSN 17514304
Pour Aghajan, Marjan (2025) Supporting early decision-making between precast and in-situ concrete in construction industry. PhD thesis, Queensland University of Technology, Australia.
Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.
Pourrahimian, E; Salhab, D; Hamzeh, F and Abourizk, S (2024) The need for a multidimensional project control perspective. Journal of Construction Engineering and Management, 150(12): 04024169, ISSN 0733-9364
Pouyandeh, F; Golabchi, M and Taghizadeh, K (2022) Providing a model to choose the most appropriate agile method in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 14-27. ISSN 17514304
Powell, A; Bagilhole, B M; Dainty, A R J and Neale, R H (2004) An investigation of women's career choice in construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Powell, A; Dainty, A R J; Bagilhole, B M and Neale, R H (2005) Coping in construction: Female students' perspectives. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Powell, A; Hassan, T; Dainty, A and Carter, C (2007) Strengthening women’s participation in construction research in Europe. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Powell, A; Hassan, T; Dainty, A and Carter, C (2008) The under-representation of women in European construction research. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Powell, R (2012) Evaluating cognitive screening as a possible solution to reducing accidents and improving workplace productivity through early preventive detection of fatigue-impairment in the construction industry. PhD thesis, University of Bath, UK.
Powell, R I and Copping, A G (2016) Measuring fatigue-related impairment in the workplace. Journal of Engineering, Design and Technology, 14(3), pp. 507-525.
Power, W; Sinnott, D and Lynch, P (2021) Evaluating the efficacy of a dedicated last planner® system facilitator to enhance construction productivity. Construction Economics and Building, 21(3), pp. 142-158. ISSN 2204-9029
Power, W; Sinnott, D and Lynch, P (2022) Accelerating construction project delivery using agile's integrated system of principles and methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029
Prasad, K V; Vasugi, V; Venkatesan, R and Bhat, N S (2019) Critical causes of time overrun in Indian construction projects and mitigation measures. International Journal of Construction Education and Research, 15(3), pp. 216-238. ISSN 1557-8771
Prasad K V; Vasugi V; Venkatesan R and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(1), pp. 58-78. ISSN 1366-4387
Prasertrungruang, T and Hadikusumo, B H W (2007) Heavy equipment management practices and problems in Thai highway contractors. Engineering, Construction and Architectural Management, 14(3), pp. 228-241. ISSN 0969-9988
Pratama, L A (2023) Immersive visualization intervention on pull planning. PhD thesis, University of Washington, USA.
Pratas, J D G (2000) Comparison of the use and success of budgetary and schedule-based management information systems (MIS) in construction. PhD thesis, University of Manchester, UK.
Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.
Preece, C N and Shafiei, M (1998) Development of client care initiatives in construction contracting organizations. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Pregenzer, L J; Seppanen, P J; Kunz, J C and Paulson, B C (1999) Value-added assessment of construction plans. Journal of Construction Engineering and Management, 125(4), pp. 242-248. ISSN 0733-9364
Premraj, P (2017) Assessment of project controls for shutdowns/turnarounds/outages. PhD thesis, University of Alabama, USA.
Prieto, A J (2021) Fuzzy systems in the digital management of heritage timber buildings in South Chile. Building Research & Information, 49(8), pp. 878-892. ISSN 0961-3218
Prieto, A J and Alarcón, L F (2023) Using fuzzy inference systems for lean management strategies in construction project delivery. Journal of Construction Engineering and Management, 149(9): 04023083, ISSN 0733-9364
Prieto, A J; Vásquez, V; Silva, A; Horn, A; Alejandre, F J and Macías-Bernal, J M (2019) Protection value and functional service life of heritage timber buildings. Building Research & Information, 47(5), pp. 567-584. ISSN 0961-3218
Priven, V and Sacks, R (2015) Effects of the last planner system on social networks among construction trade crews. Journal of Construction Engineering and Management, 141(6): 04015006, ISSN 0733-9364
Priven, V and Sacks, R (2016) Impacts of the social subcontract and last planner system interventions on the trade-crew workflows of multistory residential construction projects. Journal of Construction Engineering and Management, 142(7): 4016013, ISSN 0733-9364
Proverbs, D G (1998) A best practice for high-rise insitu concrete construction based on French, German and UK contractor performance measures. PhD thesis, University of Wolverhampton, UK.
Proverbs, D G; Olomolaiye, P O and Harris, F C (1996) Planned construction times and labour utilization: a comparison of UK and French contractors. Engineering, Construction and Architectural Management, 3(3), pp. 219-232. ISSN 0969-9988
Pryke, S D (2004) Analytical methods in construction procurement and management: A critical review. Journal of Construction Procurement, 10(1),
Pu, W; Xu, F; Chen, R and Marques, R C (2020) PPP project procurement model selection in China: Does it matter? Construction Management and Economics, 38(2), pp. 126-139. ISSN 01446193
Puddicombe, M S (2006) The limitations of planning: The importance of learning. Journal of Construction Engineering and Management, 132(9), pp. 949-955. ISSN 0733-9364
Pugh, T E (1994) Design-construction interface performance on traditional capital improvement projects. PhD thesis, University of Texas at Austin, USA.
Pultar, M (1990) Progress-based construction scheduling. Journal of Construction Engineering and Management, 116(4), pp. 670-688. ISSN 0733-9364
Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099
Pyeon, J-H (2005) Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance. PhD thesis, University of Florida, USA.
Pérez, D; Lagos, C and Fernando Alarcón, L (2022) Key last planner system metrics to assess project performance in high-rise building and industrial construction projects. Journal of Construction Engineering and Management, 148(1): 04021179, ISSN 0733-9364
Qi, K. and Lu, M. (2026) A data-driven framework for quantifying physical workload in construction using posture-hour metrics. Journal of Construction Engineering and Management, 152(7): 04026100, ISSN 0733-9364
Qi, Liang (2022) Towards understanding the diffusion and adoption of innovation in the Australian construction industry. PhD thesis, RMIT University, Australia.
Qian, Q K; Fan, K and Chan, E H W (2016) Regulatory incentives for green buildings: Gross floor area concessions. Building Research & Information, 44(5-6), pp. 675-693. ISSN 0961-3218
Qin, Y and Bulbul, T (2023) An EEG-based mental workload evaluation for ar head-mounted display use in construction assembly tasks. Journal of Construction Engineering and Management, 149(9): 04023088, ISSN 0733-9364
Qu, T (2006) The usability of graphical user interfaces of mobile computing devices designed for construction foremen: Icons and pre-defined text lists compared. PhD thesis, University of Florida, USA.
Que, B C (2002) Incorporating practicability into genetic algorithm-based time-cost optimization. Journal of Construction Engineering and Management, 128(2), pp. 139-143. ISSN 0733-9364
Qui, N T (2013) Automated schedule generation and analysis from a construction requirement perspective. PhD thesis, National University of Singapore, Singapore.
Quirke, P and Wall, J (2007) The use of public private partnerships in the delivery of capital projects in higher education in Ireland. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Qureshi, A H; Alaloul, W S; Murtiyoso, A; Hussain, S J; Saad, S and Musarat, M A (2024) Automated scaling of point cloud rebar model via aruco-supported controlled markers. Journal of Construction Engineering and Management, 150(3): 04023170, ISSN 0733-9364
Qureshi, A H; Alaloul, W S; Wing, W K; Saad, S; Alzubi, K M and Musarat, M A (2024) Factors affecting the implementation of automated progress monitoring of rebar using vision-based technologies. Construction Innovation, 24(3), pp. 770-789. ISSN 1471-4175
Rachid, Z; Toufik, B and Mohammed, B (2019) Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), pp. 371-381. ISSN 1562-3599
Rachmawati, F; Mudjahidin, M and Dewi Widowati, E (2024) Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance. International Journal of Construction Management, 24(2), pp. 213-225. ISSN 1562-3599
Rad, H N and Khosrowshahi, F (1999) Visualization of the impact of time on internal flooring. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Radosavljevic, M (2003) Chaos in construction: labour productivity and its impact on planning and organisation of firms. PhD thesis, University of Dundee, UK.
Radu, A C (2015) Life-cycle estimates of structures subjected to seismic loads. PhD thesis, Cornell University, USA.
Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364
Rahat, R; Pradhananga, P and ElZomor, M (2024) Evaluation of safe-to-fail flood solution alternatives and integration of safe-to-fail concept in AEC education to develop resilient coastal cities. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 244-258. ISSN 1759-5916
Rahbar, F (1997) Computer-aided parametric planning (CAPP). PhD thesis, Iowa State University, USA.
Rahman, M M and Alhassan, A (2012) A contractor's perception on early contractor involvement. Built Environment Project and Asset Management, 2(2), pp. 217-233. ISSN 2044-124X
Rahmani, F (2021) Challenges and opportunities in adopting early contractor involvement (ECI): Client's perception. Architectural Engineering and Design Management, 17(1-2), pp. 67-76. ISSN 1745-2007
Rai, Sanish (2016) Building occupancy simulation and data assimilation using a graph based agent oriented model. PhD thesis, Georgia State University, USA.
Raisbeck, P (2013) Time keeps on slippin', slippin', slippin' into the future: BIM, imaging and time on construction sights. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Raisbeck, P (2017) Tribes, warlords and transformers: An institutional logics model of the architectural profession. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Raja, J (2016) Reducing the environmental impact of construction through use of geosynthetics. EngD thesis, Loughborough University, UK.
Rajak, S. and Vimal, K. E. K. (2026) Blockchain-based time impact analysis method for sustainable delay management in EPC projects. Journal of Construction Engineering and Management, 152(6): 04026074, ISSN 0733-9364
Rajan, T A; Gopinath, G and Behera, M (2014) PPPs and project overruns: Evidence from road projects in India. Journal of Construction Engineering and Management, 140(5): 04013070, ISSN 0733-9364
Rajput, B; Kore, S and Agarwal, A (2024) Competencies of civil engineering graduates: Indian construction professionals' perspective. International Journal of Construction Management, 24(11), pp. 1240-1248. ISSN 1562-3599
Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ramadan, R; Ghanem, H; Khatib, J M and ElKordi, A M (2025) Effect of plant-based natural fibers on the mechanical properties and volume change of cement paste. International Journal of Building Pathology and Adaptation, 43(4), pp. 693-711. ISSN 2398-4708
Raman, P G (1977) Information and architectural design: A study of certain theoretical aspects. PhD thesis, University of Edinburgh, UK.
Ramanathan, C; Narayanan, S P and Idrus, A B (2012) Construction delays causing risks on time and cost: a critical review. Construction Economics and Building, 12(1), pp. 37-57. ISSN 2204-9029
Ramanayaka, C and Rotimi, J (2011) Strategy: Towards its applicability for successful project delivery. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ramanayaka, C D D (2013) Developing a strategy-led approach as a suitable methodology for construction project planning and implementation. PhD thesis, Auckland University of Technology, New Zealand.
Ramanayaka, C D E; Olatunji, O A and Rotimi, J O (2023) Critical success factors of strategy-led planning of high-profile projects. International Journal of Construction Management, 23(1), pp. 75-88. ISSN 1562-3599
Ramani, P V and Ksd, L K L (2021) Application of lean in construction using value stream mapping. Engineering, Construction and Architectural Management, 28(1), pp. 216-228. ISSN 0969-9988
Ramani, P V; Selvaraj, P; T., S and Gupta, A (2022) Application of linear scheduling in water canal construction with a comparison of critical path method. Journal of Construction in Developing Countries, 27(1), pp. 189-212. ISSN 1823-6499
Ramsey, D; El Asmar, M and Gibson, G E (2016) Quantitative performance assessment of single-step versus two-step design-build procurement. Journal of Construction Engineering and Management, 142(9): 04016033, ISSN 0733-9364
Rana, V.; Singh, V.; Singh, A. R.; Rao, M. S. and Kashyap, K. (2026) Promoting real estate sensitivity among AEC students: A board game-based approach to applied learning. Architectural Engineering and Design Management, 22(1), pp. 149-167. ISSN 1745-2007
Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.
Ranasinghe, M (1994) Quantification and management of uncertainty in activity duration networks. Construction Management and Economics, 12(1), pp. 15-29. ISSN 01446193
Ranasinghe, M (1998) Risk management in the insurance industry: Insights for the engineering construction industry. Construction Management and Economics, 16(1), pp. 31-39. ISSN 01446193
Raouf, A M and Al-Ghamdi, S G (2019) Effectiveness of project delivery systems in executing green buildings. Journal of Construction Engineering and Management, 145(10): 03119005, ISSN 0733-9364
Rapaport, C and Ashkenazi, I (2019) Drop down or flee out? New official earthquake recommended instructions for schools and kindergartens in Israel. International Journal of Disaster Resilience in the Built Environment, 10(1), pp. 52-64. ISSN 1759-5916
Rasanjali, W A; Mendis, A P K D; Perera, B A K S and Disaratna, V (2024) Implementing enterprise resource planning for lean waste minimisation: Challenges and proposed strategies. Smart and Sustainable Built Environment, 13(2), pp. 330-353. ISSN 2046-6099
Rasdorf, W; Lewis, P; Arocho, I and Hummer, J (2015) Characterizing air pollutant emissions for highway construction projects. Smart and Sustainable Built Environment, 4(3), pp. 315-328. ISSN 2046-6099
Rasdorf, W J and Abudayyeh, O Y (1991) Cost-and schedule-control integration: Issues and needs. Journal of Construction Engineering and Management, 117(3), pp. 486-502. ISSN 0733-9364
Rasdorf, W J and Herbert, M J (1990) Bar coding in construction engineering. Journal of Construction Engineering and Management, 116(2), pp. 261-280. ISSN 0733-9364
Rashed, A (2022) Influence of internal factors in construction organizations on the implementation of integrated project delivery viewed from the organizational change theory. PhD thesis, Illinois Institute of Technology, USA.
Rasheed, E O; Yu, J; Hale, S and Booth, N (2022) The impact of external and internal sources of motivation on young women’s interest in construction-related careers: An exploratory study. International Journal of Construction Education and Research, 18(2), pp. 159-178. ISSN 1557-8771
Rashid, R A (1998) A model for an effective implementation of the government technology transfer policy in the Malaysian construction industry. PhD thesis, University of Reading, UK.
Rasul, N; Malik, M S A; Bakhtawar, B and Thaheem, M J (2021) Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, 21(11), pp. 1099-1114. ISSN 1562-3599
Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708
Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708
Rathnayake, A P (2021) A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates. PhD thesis, University of Salford, UK.
Rawlins, J and Marasini, R (2011) Are the construction graduates on ciob accredited degree courses meeting the skills required by the industry? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Rawlinson, F and Farrell, P (2009) The vision of zero risk tolerance in craft workers and operatives: An unattainable goal? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Rawlinson, F and Farrell, P (2010) UK construction industry site health and safety management: An examination of promotional web material as an indicator of current direction. Construction Innovation, 10(4), pp. 435-446. ISSN 1471-4175
Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364
Raynsford, N (1999) The UK's approach to sustainable development in construction. Building Research & Information, 27(6), pp. 419-423. ISSN 0961-3218
Razak, N A (2024) Development of safety leading and lagging indicators framework for contractor selection in construction projects. PhD thesis, University of Manchester, UK.
Reaney, M; Griffith, A; Watson, P A and Ellis, C (2001) Construction cost control implications for the planning application process. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Reda, R and Carr, R I (1989) Time-cost trade-off among related activities. Journal of Construction Engineering and Management, 115(3), pp. 475-486. ISSN 0733-9364
Reda, R M (1990) RPM: Repetitive project modeling. Journal of Construction Engineering and Management, 116(2), pp. 316-330. ISSN 0733-9364
Redden, L and Bugg, R A (2022) Efficacy and benefits of a required service-learning course in construction management education. International Journal of Construction Education and Research, 18(4), pp. 315-332. ISSN 1557-8771
Rehman, A; GhaffarianHoseini, A; Naismith, N; Almhafdy, A; Ghaffarianhoseini, A; Tookey, J and Urrehman, S (2025) Development of trust-based autonomous driving framework in New Zealand. Smart and Sustainable Built Environment, 14(2), pp. 429-470. ISSN 2046-6099
Reinhardt, J (2003) Navigational models for effective and efficient interaction with integrated product and process models on construction sites. PhD thesis, Carnegie Mellon University, USA.
Reinschmidt, K and Trejo, D (2006) Economic value of building faster. Journal of Construction Engineering and Management, 132(7), pp. 759-766. ISSN 0733-9364
Reis, J S and Lucko, G (2016) Productivity scheduling method with maximum constraints. International Journal of Construction Management, 16(1), pp. 77-93. ISSN 1562-3599
Ren, S (1997) GIS-based tools for earthquake risk assessment of point and spatially distributed lifeline systems. PhD thesis, State University of New York at Buffalo, USA.
Ren, Z (2002) A multi-agent systems approach to construction claims negotiation. PhD thesis, Loughborough University, UK.
Ren, Z; Atout, M and Jones, J (2008) Root causes of construction project delays in Dubai. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099
Renukappa, S; Egbu, C; Akintoye, A and Goulding, J (2012) A critical reflection on sustainability within the UK industrial sectors. Construction Innovation, 12(3), pp. 317-334. ISSN 1471-4175
Renukappa, S; Egbu, C; Suresh, S and Mushatat, S (2015) Drivers for managing sustainability-related knowledge. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 66-75. ISSN 17514304
Renukappa, S; Suresh, S and Alosaimi, H (2021) Knowledge management-related training strategies in Kingdom of Saudi Arabia construction industry: An empirical study. International Journal of Construction Management, 21(7), pp. 713-723. ISSN 1562-3599
Retamal, F; Salazar, L A and Alarcón, L F (2022) Online monitoring and implementation of commitment management performance and its impact on project planning in four construction projects. Journal of Construction Engineering and Management, 148(10): 05022011, ISSN 0733-9364
Revadigar, S P (1996) Automated analysis of building seismic records. PhD thesis, University of Houston, USA.
Reyes Veras, P; Renukappa, S and Suresh, S (2022) Awareness of big data concept in the Dominican Republic construction industry: An empirical study. Construction Innovation, 22(3), pp. 465-486. ISSN 1471-4175
Reynolds, M F (1990) Facilities planning and construction internship. DEng thesis, Texas A&M University, USA.
Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.
Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), pp. 2864-2876. ISSN 1562-3599
Rezakhani, P (2022) Project scheduling and performance prediction: A fuzzy-Bayesian network approach. Engineering, Construction and Architectural Management, 29(6), pp. 2233-2244. ISSN 0969-9988
Rezakhani, P (2023) Empirical study of housing recovery and property abandonment following valley fire in California: Insights from neighborhood characteristics and building attributes. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 628-639. ISSN 1759-5916
Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration. PhD thesis, Illinois Institute of Technology, USA.
Riad, N I; Arditi, D and Mohammadi, J (1994) Integrated system for managing owner-directed project acceleration. Journal of Construction Engineering and Management, 120(1), pp. 77-95. ISSN 0733-9364
Rich, D (2014) On-site application of self-compacting concrete. EngD thesis, Loughborough University, UK.
Rich, K (2011) Design and construction process of two LEED certified university buildings: A collective case study. PhD thesis, University of Missouri - Columbia, USA.
Richards, J L (1973) An integrated approach to construction management. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Riley, D R (1994) Modeling the space behavior of construction activities. PhD thesis, Pennsylvania State University, USA.
Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364
Robert Thomas, R (2020) Examining the relationship of bid difference and disadvantaged business enterprise participation goals in highway construction projects. PhD thesis, Purdue University, USA.
Robinson, H S (2000) A critical systems approach to infrastructure investment and resource management in developing countries. PhD thesis, London South Bank University, UK.
Robles, J (2023) Fast-track projects with cost and schedule overruns: A supply chain management perspective. DBA thesis, Capella University, USA.
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Robson, A; Boyd, D and Thurairajah, N (2015) Are contractors' cost accounting practices up to the job of establishing improvement in site operations? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Rocha, C G D; Anzanello, M J and Gerchman, M (2018) Method to assess the match between clients' input and decoupling points in customized building projects. Journal of Construction Engineering and Management, 144(5): 04018018, ISSN 0733-9364
Rochell, K; Bulkeley, H and Runhaar, H (2024) Nature for resilience reconfigured: Global-to-local translation of frames in Africa. Buildings & Cities, 5(1), pp. 1-15. ISSN 2632-6655
Rodger, R G (1976) Scottish urban housebuilding, 1870-1914. PhD thesis, University of Edinburgh, UK.
Roggema, R and Van Den Dobbelsteen, A (2012) Swarm planning for climate change: An alternative pathway for resilience. Building Research & Information, 40(5), pp. 606-624. ISSN 0961-3218
Roghabadi, M A and Moselhi, O (2022) Forecasting project duration using risk-based earned duration management. International Journal of Construction Management, 22(16), pp. 3077-3087. ISSN 1562-3599
Roghanian, E; Alipour, M and Rezaei, M (2018) An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management, 18(1), pp. 1-13. ISSN 1562-3599
Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988
Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan. PhD thesis, University of Michigan, USA.
Rokooei, S (2016) Project management education research excellence within cyber-infrastructure environment. PhD thesis, University of Nebraska - Lincoln, USA.
Romanello, G (2018) Stability analysis of mobile cranes and determination of outriggers loading. Journal of Engineering, Design and Technology, 16(6), pp. 938-958. ISSN 1726-0531
Roofigari-Esfahan, N; Paez, A and N.razavi, S (2015) Location-aware scheduling and control of linear projects: Introducing space-time float prisms. Journal of Construction Engineering and Management, 141(1): 06014008, ISSN 0733-9364
Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-aware linear schedule optimization: A space-time constraint-satisfaction approach. Journal of Construction Engineering and Management, 143(5): 04016132, ISSN 0733-9364
Rooney P, A R (2013) A case study of changing procurement practices on delivery of highways projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Rosenfeld, Y (2014) Root-cause analysis of construction-cost overruns. Journal of Construction Engineering and Management, 140(1): 04013039, ISSN 0733-9364
Rosenfeld, Y and Geltner, D (1991) Cost-plus and incentive contracting: Some false benefits and inherent drawbacks. Construction Management and Economics, 9(5), pp. 481-490. ISSN 01446193
Rosenfeld, Y; Navon, R and Cohen, L (1998) Methodology for prioritizing cost-effective construction technologies. Journal of Construction Engineering and Management, 124(3), pp. 176-184. ISSN 0733-9364
Roshani, D (2005) Integrated collaborative building design using internet technology. PhD thesis, University of Nottingham, UK.
Rosli, M F; Muhammad Tamyez, P F and Zahari, A R (2023) The effects of suitability and acceptability of lean principles in the flow of waste management on construction project performance. International Journal of Construction Management, 23(1), pp. 114-125. ISSN 1562-3599
Rosner, J W; Thal Jr, A E and West, C J (2009) Analysis of the design-build delivery method in Air Force construction projects. Journal of Construction Engineering and Management, 135(8), pp. 710-717. ISSN 0733-9364
Rostami, A; Khodadadyan, A; Sommerville, J and Wong, I L (2015) Training provisions for risk management in SMEs in the UK construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Rotimi, J O B and Ramanayaka, C D D (2015) Analysis of the influence of a strategy-led planning approach on successful construction project implementation. Construction Economics and Building, 15(2), pp. 13-30. ISSN 2204-9029
Rotimi, J O B and Wilkinson, S (2014) Improving environmental management legislation to facilitate post-disaster reconstruction. International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 23-37. ISSN 1759-5916
Rousseau, D and Chen, Y (2001) Sustainability options for China's residential building sector. Building Research & Information, 29(4), pp. 293-301. ISSN 0961-3218
Roy, R; Brown, J and Gaze, C (2003) Re-engineering the construction process in the speculative house-building sector. Construction Management and Economics, 21(2), pp. 137-146. ISSN 01446193
Royer, K (1986) The federal government and the critical path. Journal of Construction Engineering and Management, 112(2), pp. 220-225. ISSN 0733-9364
Rubio, F J (2018) Maintaining and widening the M25 motorway, UK: A private finance case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 197-206. ISSN 17514304
Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193
Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.
Rupasinghe, C S and De Silva Weliange, S (2024) Climate change adaptation and mitigation at individual level: Knowledge and attitudes among school teachers in Kalutara district. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 395-408. ISSN 1759-5916
Russell, A D (1993) Computerized daily site reporting. Journal of Construction Engineering and Management, 119(2), pp. 385-402. ISSN 0733-9364
Russell, A D and Caselton, W F (1988) Extensions to linear scheduling optimization. Journal of Construction Engineering and Management, 114(1), pp. 36-52. ISSN 0733-9364
Russell, A D and Ranasinghe, M (1991) Decision framework for fast-track construction: A deterministic analysis. Construction Management and Economics, 9(5), pp. 467-479. ISSN 01446193
Russell, A D and Ranasinghe, M (1992) Analytical approach for economic risk quantification of large engineering projects. Construction Management and Economics, 10(4), pp. 277-301. ISSN 01446193
Russell, A D and Wong, W C M (1993) New generation of planning structures. Journal of Construction Engineering and Management, 119(2), pp. 196-214. ISSN 0733-9364
Russell, J S and Jaselskis, E J (1992) Quantitative study of contractor evaluation programs and their impact. Journal of Construction Engineering and Management, 118(3), pp. 612-624. ISSN 0733-9364
Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.
Russell, M M; Howell, G; Hsiang, S M and Liu, M (2013) Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10): 04013008, ISSN 0733-9364
Russell, M M; Hsiang, S M; Liu, M and Wambeke, B (2014) Causes of time buffer and duration variation in construction project tasks: Comparison of perception to reality. Journal of Construction Engineering and Management, 140(6): 4014016, ISSN 0733-9364
Russell, M M; Liu, M; Howell, G and Hsiang, S M (2015) Case studies of the allocation and reduction of time buffer through use of the last planner system. Journal of Construction Engineering and Management, 141(2): 04014068, ISSN 0733-9364
Russell, M M; Liu, M and Hsiang, S M (2015) Planning for uncertainty: Use of structural equation modelling to determine the causal structure of time buffer allocation. Construction Management and Economics, 33(10), pp. 783-798. ISSN 01446193
Russell, R C (2016) The development of a design and construction process protocol to support occupational therapists in delivering effective home modifications. PhD thesis, University of Salford, UK.
Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175
Rusydiana, A. S.; Uula, M. M. and Riani, R. (2026) Measuring the performance of climate action of OIC countries. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 277-296. ISSN 1759-5908
Rutherford, N N S and Daniel, E I (2025) A systematic review of the barriers and attraction strategies for females in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(3), pp. 140-150. ISSN 17514304
Rutter, D and Potter, B (2003) The role of multi-criterion decision methods (MCDM) in securing best value from buildings procured through PPP/PFI. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Rwelamila, P D (2002) Creating an effective construction industry strategy in South Africa. Building Research & Information, 30(6), pp. 435-445. ISSN 0961-3218
Rwelamila, P D and Machete, S M (1997) Marketing development in civil engineering consultancy firms in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Rwelamila, P M D (2007) Project management competence in public sector infrastructure organisations. Construction Management and Economics, 25(1), pp. 55-66. ISSN 1466433X
Rwelamila, P M D and Purushottam, N (2016) Strategic project management as an innovative approach for sustainable green campus buildings in Africa: The need for a paradigm shift. Smart and Sustainable Built Environment, 5(3), pp. 261-271. ISSN 2046-6099
Rybkowski, Z K; Arroyo, P and Parrish, K (2022) Assessment of current target value design practices: Consistencies and inconsistencies of application. Construction Management and Economics, 40(7-8), pp. 598-617. ISSN 01446193
Rylander, D (2021) Productivity improvements in construction transport operation through lean thinking and systems of systems. PhD thesis, Malardalen University, Sweden.
Ryor, M M (2013) Utilization of risk management practices by construction project managers in the United States. PhD thesis, Capella University, USA.
Ryu, H G; Lee, H S and Yu, J H (2003) A method for analysing delay duration considering lost productivity through construction productivity data model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Ryu, J; Seo, J; Jebelli, H and Lee, S (2019) Automated action recognition using an accelerometer-embedded wristband-type activity tracker. Journal of Construction Engineering and Management, 145(1): 04018114, ISSN 0733-9364
S. Hayles, C; Dean, M; A. Lappin, S and E. McCullough, J (2013) Climate change adaptation : A decision support framework to encourage environmentally responsible behaviour. Smart and Sustainable Built Environment, 2(2), pp. 192-214. ISSN 2046-6099
Saad, A; Ajayi, S O and Alaka, H A (2023) Trends in BIM-based plugins development for construction activities: A systematic review. International Journal of Construction Management, 23(16), pp. 2756-2768. ISSN 1562-3599
Sackey, E and Akotia, J (2017) Spanning the multilevel boundaries of construction organisations: Towards the delivery of BIM-compliant projects. Construction Innovation, 17(3), pp. 273-293. ISSN 1471-4175
Sacks, R; Esquenazi, A and Goldin, M (2007) LEAPCON: Simulation of lean construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(7), pp. 529-539. ISSN 0733-9364
Sacks, R and Goldin, M (2007) Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(5), pp. 374-384. ISSN 0733-9364
Sacks, R; Seppänen, O; Priven, V and Savosnick, J (2017) Construction flow index: A metric of production flow quality in construction. Construction Management and Economics, 35(1-2), pp. 45-63. ISSN 01446193
Sadat, H and Thomas, N (2025) An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects. International Journal of Construction Management, 25(6), pp. 624-634. ISSN 1562-3599
Sadeghi, S.; Niu, C.; Marjani, T. and Lotfi, R. (2026) Machine learning-enabled construction project management: Systematic review, comparative performance synthesis and implementation framework. Built Environment Project and Asset Management, 16(3), pp. 461-483. ISSN 2044-124X
Sadeghi, N; Dehghani, M S and Ingolfsson, A (2024) Choice of probability distributions for activity durations in project networks with limited sample size. Journal of Construction Engineering and Management, 150(3): 04024002, ISSN 0733-9364
Sadeghi, N; Fayek, A R and Seresht, N G (2016) A fuzzy discrete event simulation framework for construction applications: Improving the simulation time advancement. Journal of Construction Engineering and Management, 142(12): 04016071, ISSN 0733-9364
Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.
Sadeghi, Neda (2024) Quantifying the impact of time-space conflict on construction project schedules: A task-centric approach. PhD thesis, Texas A&M University, USA.
Sadeghpour, F; Moselhi, O and Alkass, S T (2006) Computer-aided site layout planning. Journal of Construction Engineering and Management, 132(2), pp. 143-151. ISSN 0733-9364
Sadeh, H; Zhang, R; Gaedicke, C; Shahbodaghlou, F; Lee, M J and Todorov, D (2026) Embracing generative AI in construction through a quantitative analysis and weighted score ranking of perceptions, applications, and complexities. Journal of Construction Engineering and Management, 152(5): 04026041, ISSN 0733-9364
Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.
Safapour, E; Kermanshachi, S and Rouhanizadeh, B (2022) Key components of successful post–hurricane reconstruction of transportation infrastructures. Built Environment Project and Asset Management, 12(5), pp. 775-791. ISSN 2044-124X
Saffar, N (2020) The development of an offsite construction adoption strategic guideline for the Iraqi construction industry. PhD thesis, University of Salford, UK.
Safikhani, S.; Shafaat, A. and Sartipipour, M. (2026) Automated project rescheduling with preemptive activity splitting for baseline restoration. Journal of Construction Engineering and Management, 152(6): 04026065, ISSN 0733-9364
Saha, Swapan Kumar (2002) Predicting realistic performance rate and optimum inspection rate in construction. PhD thesis, University of Western Sydney, Australia.
Said, H and El-Rayes, K (2011) Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6), pp. 421-431. ISSN 0733-9364
Said, H M and Kandimalla, P (2018) Performance measurement of building sheet-metal ductwork prefabrication under batch production settings. Journal of Construction Engineering and Management, 144(2): 4017107, ISSN 0733-9364
Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364
Saidu, I; Shakantu, W; Adamu, A and Anugwo, I (2017) A bespoke approach for relating material waste to cost overrun in the construction indsutry. Journal of Construction Business and Management, 1(1), pp. 39-52. ISSN 2521-0165
Sailer, K; Utley, M; Pachilova, R; Fouad, A T Z; Li, X; Jayaram, H and Foster, P J (2025) Lanes, clusters, sightlines: Modelling patient flow in medical clinics. Buildings & Cities, 6(1), pp. 201-218. ISSN 2632-6655
Saka, A B and Chan, D W M (2019) A global taxonomic review and analysis of the development of BIM research between 2006 and 2017. Construction Innovation, 19(3), pp. 465-490. ISSN 1471-4175
Saka, N (2013) The impact of foreign direct investment on the construction sectors of Africa. PhD thesis, Glasgow Caledonian University, UK.
Saka, N and Ajayi, O M (2010) A comparative assessment of incentive scheme between indigenous and multinational construction contractors in Nigeria. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Saka, N and Mudi, A (2007) Practices and challenges of supply chain management by building contracting firms in the Lagos metropolitan area. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Saka, N and Olanipekun, A O (2021) Impact of the banking sector reform in the construction sector. Journal of Financial Management of Property and Construction, 26(3), pp. 387-407. ISSN 1366-4387
Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.
Sakhakarmi, S; Park, J and Cho, C (2019) Enhanced machine learning classification accuracy for scaffolding safety using increased features. Journal of Construction Engineering and Management, 145(2): 04018133, ISSN 0733-9364
Sakib, M N; Chaspari, T and Behzadan, A H (2022) A feedforward neural network for drone accident prediction from physiological signals. Smart and Sustainable Built Environment, 11(4), pp. 1017-1041. ISSN 2046-6099
Sakka, Z I and El-Sayegh, S M (2007) Float consumption impact on cost and schedule in the construction industry. Journal of Construction Engineering and Management, 133(2), pp. 124-130. ISSN 0733-9364
Salam, M A; Sarkar, S; Blackwood, D J and Staines, H J (1999) High-rise building construction in Bangladesh: Experience of questionnaire development and on-site data collection. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Salam, M A; Staines, H J; Blackwood, D J and Sarkar, S (2001) Analysis of the relationships between causes of delay in construction projects in Bangladesh. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Salam, Md Abdus (2007) Time and cost overruns on high-rise building construction in Bangladesh. PhD thesis, Abertay University, UK.
Salama, M; El Hamid, M A and Keogh, B (2008) Investigating the causes of delay within oil and gas projects in the UAE. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Salama, T and Moselhi, O (2019) Multi-objective optimization for repetitive scheduling under uncertainty. Engineering, Construction and Architectural Management, 26(7), pp. 1294-1320. ISSN 0969-9988
Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175
Salamati, A A (2001) Urban housing design in Iran in response to socio-cultural and environmental conditions. PhD thesis, University of Strathclyde, UK.
Salas-Morera, L; Arauzo-Azofra, A; García-Hernández, L; Palomo-Romero, J M and Ayuso-Muñoz, J L (2018) New approach to the distribution of project completion time in PERT networks. Journal of Construction Engineering and Management, 144(10): 04018094, ISSN 0733-9364
Salazar, L A; Ballard, G; Arroyo, P and Alarcón, L F (2022) Development of a commitment management system for construction projects. Journal of Construction Engineering and Management, 148(12): 05022012, ISSN 0733-9364
Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Salem, O and Mohanty, S (2008) Project management practices and information technology research. Journal of Construction Engineering and Management, 134(7), pp. 501-508. ISSN 0733-9364
Salhab, D; Lindhard, S M and Hamzeh, F (2024) Schedule compression and emerging waste in construction: An assessment of overlapping activities. Engineering, Construction and Architectural Management, 31(12), pp. 4920-4941. ISSN 0969-9988
Salhab, D; Lindhard, S M and Hamzeh, F (2024) Simulation-based approximation of the gain from applying overlapping activities. Journal of Construction Engineering and Management, 150(4): 04024019, ISSN 0733-9364
Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364
Salleh, Rohaniyati (2009) Critical success factors of project management for Brunei construction projects: Improving project performance. PhD thesis, Queensland University of Technology, Australia.
Salman, A and Ahmad, W (2025) Implementation of augmented reality and mixed reality applications for smart facilities management: A systematic review. Smart and Sustainable Built Environment, 14(1), pp. 254-275. ISSN 2046-6099
Salman, A; Moselhi, O and Zayed, T (2013) Scheduling model for rehabilitation of distribution networks using MINLP. Journal of Construction Engineering and Management, 139(5), pp. 498-509. ISSN 0733-9364
Salmi, A; Jussila, J and Hämäläinen, M (2022) The role of municipalities in transformation towards more sustainable construction: The case of wood construction in Finland. Construction Management and Economics, 40(11-12), pp. 934-954. ISSN 01446193
Salter, M (1989) Planning systems for small firms. PhD thesis, Sheffield Hallam University, UK.
Salvado, F; Almeida, N M and Vale e Azevedo, A (2018) Toward improved LCC-informed decisions in building management. Built Environment Project and Asset Management, 8(2), pp. 114-133. ISSN 2044-124X
Sam, M; Franz, B W and Alwisy, A (2026) Comparing vulnerability to adverse events in construction processes performed by human-robot collaboration and traditional crews: A case study in drywall finishing. Journal of Construction Engineering and Management, 152(6): 05026005, ISSN 0733-9364
Sam, A (2023) A framework for leadership development in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Samarakkody, A L; Perera, B A K S and Palliyaguru, R (2022) Appropriateness of soft landings concept for avoiding malpractices in Sri Lankan building projects. International Journal of Construction Management, 22(14), pp. 2817-2829. ISSN 1562-3599
Samarasingha, D.; Ranadewa, K. A. T. O. and Parameswaran, A. (2026) Extended reality-integrated construction progress monitoring in the construction industry. Journal of Engineering, Design and Technology, 24(5), pp. 1135-1155. ISSN 1726-0531
Samarghandi, H; Tabatabaei, S M M; Taabayan, P; Hashemi, A M and Willoughby, K (2016) Studying the reasons for delay and cost overrun in construction projects: The case of Iran. Journal of Construction in Developing Countries, 21(1), pp. 51-84. ISSN 1823-6499
Samasoni, J C (2017) Evaluating the feasibility of implementing a risk-based inspection scheme by building consent authorities in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Sami Kashkooli, A M (2013) A critical building lifecycle assessment framework for building designers and decision makers. PhD thesis, University of Sheffield, UK.
Sami Ur Rehman, M; Shafiq, M T and Afzal, M (2022) Impact of COVID-19 on project performance in the UAE construction industry. Journal of Engineering, Design and Technology, 20(1), pp. 245-266. ISSN 1726-0531
Sami Ur Rehman, M; Shafiq, M T; Ullah, F and Galal Ahmed, K (2023) A critical appraisal of traditional methods of construction progress monitoring. Built Environment Project and Asset Management, 13(6), pp. 830-845. ISSN 2044-124X
Sami Ur Rehman, M; Thaheem, M J; Nasir, A R and Khan, K I A (2022) Project schedule risk management through building information modelling. International Journal of Construction Management, 22(8), pp. 1489-1499. ISSN 1562-3599
Samman, R A and Graham, I (2007) The six sigma project management strategy. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Sampath, D; De Silva, N and Withanage, K T (2020) Entrepreneurial potentials in Sri Lankan quantity surveyors. International Journal of Construction Management, 23(1), pp. 48-57. ISSN 1562-3599
Samsami, R (2022) A framework for active construction inspection and visualization using uas. PhD thesis, Michigan Technological University, USA.
Samsurijan, M S; Radin Firdaus, R B; Rohayati, M I; Ebekozien, A and Aigbavboa, C (2025) Moderating effect of government policy on the relationship between low-cost housing demand-supply gap and COVID-19 impact. Smart and Sustainable Built Environment, 14(1), pp. 72-92. ISSN 2046-6099
Samuel, D (2014) Predicting significant contract risks at the tender evaluation stage. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 100-107. ISSN 17514304
Samuel, D (2018) Risk-based tender evaluation using multicriteria decision analysis in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 58-69. ISSN 17514304
Samuels, A F and Bruder, M J (1996) Construction representative: Scheduling and cost management. Journal of Construction Engineering and Management, 122(3), pp. 281-290. ISSN 0733-9364
San Cristóbal, J R (2009) Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), pp. 1271-1274. ISSN 0733-9364
Sanad, H M; Ammar, M A and Ibrahim, M E (2008) Optimal construction site layout considering safety and environmental aspects. Journal of Construction Engineering and Management, 134(7), pp. 536-544. ISSN 0733-9364
Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364
Sandberg, R; Löwstedt, M and Räisänen, C (2021) Working in a loosely coupled system: Exploring practices and implications of coupling work on construction sites. Construction Management and Economics, 39(3), pp. 212-226. ISSN 01446193
Sanderford, A R; McCoy, A P and Keefe, M J (2018) Adoption of energy star certifications: Theory and evidence compared. Building Research & Information, 46(2), pp. 207-13. ISSN 0961-3218
Sanders, C H and Phillipson, M C (2003) UK adaptation strategy and technical measures: The impacts of climate change on buildings. Building Research & Information, 31(3-4), pp. 210-221. ISSN 0961-3218
Sandhyavitri, A (2022) Stochastic analyses for managing risk of delay in duri oil construction projects, Indonesia. International Journal of Construction Management, 22(4), pp. 711-731. ISSN 1562-3599
Sanga, S A and Lucian, C (2016) Cost shares and factor-cost ratios in owner-built incremental housing in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 21(1), pp. 113-130. ISSN 1823-6499
Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599
Sanyal, A P and Bhattacharya, S P (2024) A comparative analysis between CBR based prediction models and mra models for high-rise construction delay prediction. International Journal of Construction Management, 24(2), pp. 124-136. ISSN 1562-3599
Saoud, E A B (1996) Expert systems for management training in the construction industry. PhD thesis, University of Edinburgh, UK.
Sapountzis, S (2013) An investigation into the development of an effective benefits realisation process for healthcare infrastructure projects. PhD thesis, University of Salford, UK.
Sarah Slaughter, E and Shimizu, H (2000) 'Clusters' of innovations in recent long span and multi-segmental bridges. Construction Management and Economics, 18(3), pp. 269-280. ISSN 01446193
Sarhan, S; Pretlove, S; Elghaish, F; Matarneh, S and Mossman, A (2025) Sources of occupational stress in UK construction projects: An empirical investigation and agenda for future research. Smart and Sustainable Built Environment, 14(6), pp. 1701-1728. ISSN 2046-6099
Sarhan, J G; Xia, B; Fawzia, S and Karim, A (2017) Lean construction implementation in the Saudi Arabian construction industry. Construction Economics and Building, 17(1), pp. 46-69. ISSN 2204-9029
Sarhan, Jamil Ghazi I (2018) Development of a lean construction framework for the Saudi Arabian construction industry. PhD thesis, Queensland University of Technology, Australia.
Sarhan, S and Fox, A (2013) Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts. Construction Economics and Building, 13(1), pp. 23-35. ISSN 2204-9029
Sarihi, M; Shahhosseini, V and Banki, M T (2020) Multiskilled project management workforce assignment across multiple projects regarding competency. Journal of Construction Engineering and Management, 146(12): 04020134, ISSN 0733-9364
Sarisley, E F (1990) Construction methods and costs of stress-laminated timber bridges. Journal of Construction Engineering and Management, 116(3), pp. 432-447. ISSN 0733-9364
Sarkar, D; Gohel, J and Dabasia, K (2021) Optimization of ready mixed concrete delivery for commercial batching plants of Ahmedabad, India. International Journal of Construction Management, 21(10), pp. 1024-1043. ISSN 1562-3599
Sarkar, D; Jha, K N and Patel, S (2021) Critical chain project management for a highway construction project with a focus on theory of constraints. International Journal of Construction Management, 21(2), pp. 194-207. ISSN 1562-3599
Sarkar, D; Patel, H and Dave, B (2022) Development of integrated cloud-based internet of things (IoT) platform for asset management of elevated metro rail projects. International Journal of Construction Management, 22(10), pp. 1993-2002. ISSN 1562-3599
Sarraj, Z M A (1990) Formal development of line-of-balance technique. Journal of Construction Engineering and Management, 116(4), pp. 689-704. ISSN 0733-9364
Sassano, G (2022) Optimism bias and cost overruns: experimenting on the internal and external views in resources and time estimation. PhD thesis, University College London, UK.
Sastry, M K S and Seekumar, L (2012) Automation of real time monitoring and controlling of a marine loading arm. Journal of Engineering, Design and Technology, 10(2), pp. 217-227. ISSN 1726-0531
Satish, S. and Umar, T. (2026) Bridging innovation and practice: Assessing the readiness for 3D printing in construction. Engineering, Construction and Architectural Management, 33(7), pp. 6014-6038. ISSN 0969-9988
Satterfield, J H (2020) Strategies for improving the performance of multigenerational cohorts in the construction industry. PhD thesis, Walden University, USA.
Saurin, T A; Formoso, C T; Reck, R; Beck Da Silva Etges, B M and Ribeiro, J L D (2015) Findings from the analysis of incident-reporting systems of construction companies. Journal of Construction Engineering and Management, 141(9): 501500, ISSN 0733-9364
Savicky, J (2023) Exploration of solicitation optimization within the built environment. PhD thesis, Arizona State University, USA.
Savoie, É; Sapinski, J P and Laroche, A M (2025) Key factors for revitalising heritage buildings through adaptive reuse. Buildings & Cities, 6(1), pp. 103-120. ISSN 2632-6655
Savva, C (2023) Lessons that can be learnt using action research strategies within TfL. PhD thesis, University of Liverpool, UK.
Sawalhi, N and Enshassi, A (2005) Application of project time management tools and techniques to the construction industry in the Gaza Strip. Construction Economics and Building, 5(1), pp. 1-8. ISSN 2204-9029
Sawhney, A (1994) Simulation-based planning for construction. PhD thesis, University of Alberta, Canada.
Sawhney, A and AbouRizk, S M (1995) HSM-simulation-based planning method for construction projects. Journal of Construction Engineering and Management, 121(3), pp. 297-303. ISSN 0733-9364
Sawhney, A; Walsh, K D; Bashford, H H and Palaniappan, S (2009) Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management, 135(4), pp. 319-329. ISSN 0733-9364
Scala, N M; Alves, T d C L; Hawkins, D; Schiavone, V and Liu, M (2025) Application of the maturity model for collaborative scheduling for construction projects. Engineering, Construction and Architectural Management, 32(11), pp. 7399-7425. ISSN 0969-9988
Scala, N M; Liu, M; Alves, T C L; Schiavone, V and Hawkins, D (2023) The gold standard: Developing a maturity model to assess collaborative scheduling. Engineering, Construction and Architectural Management, 30(4), pp. 1636-1656. ISSN 0969-9988
Scales, Jeffrey G (2021) Including generative mechanisms in project scheduling using hybrid simulation. PhD thesis, University of Technology Sydney, Australia.
Schatteman, D; Herroelen, W; Van De Vonder, S and Boone, A (2008) Methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134(11), pp. 885-893. ISSN 0733-9364
Scheublin, F J M (2001) Project alliance contract in the Netherlands. Building Research & Information, 29(6), pp. 451-455. ISSN 0961-3218
Schexnayder, C; Knutson, K and Fente, J (2005) Describing a beta probability distribution function for construction simulation. Journal of Construction Engineering and Management, 131(2), pp. 221-229. ISSN 0733-9364
Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.
Schneider, R H (1981) Local construction regulatory process innovation: A comparative analysis of Florida building inspection departments. PhD thesis, University of Florida, USA.
Scholtenhuis, L L O; Hartmann, T and Dorée, A G (2016) Testing the value of 4D visualizations for enhancing mindfulness in utility reconstruction works. Journal of Construction Engineering and Management, 142(7): 4016015, ISSN 0733-9364
Schrapers, M (2018) Applying standards, guidelines and methods in construction project management. PhD thesis, Edinburgh Napier University, UK.
Schroeder, H P (1991) Dycam 1.0: Dynamic construction activity model, a decision support tool for construction planning. PhD thesis, University of Colorado at Boulder, USA.
Schubert, F N (1991) U.S. Army corps of engineers and Afghanistan's highways 1960–1967. Journal of Construction Engineering and Management, 117(3), pp. 445-459. ISSN 0733-9364
Schubert, J (2024) Maintaining a city against nature: Climate adaptation in Beira. Buildings & Cities, 5(1), pp. 35-49. ISSN 2632-6655
Schultmann, F and Rentz, O (2002) Scheduling of deconstruction projects under resource constraints. Construction Management and Economics, 20(5), pp. 391-401. ISSN 01446193
Schultmann, F and Sunke, N (2007) Energy-oriented deconstruction and recovery planning. Building Research & Information, 35(6), pp. 602-615. ISSN 0961-3218
Schweber, L (2015) Putting theory to work: The use of theory in construction research. Construction Management and Economics, 33(10), pp. 840-860. ISSN 01446193
Schönbeck, P (2022) Data based configuration decisions in hospital construction projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Scott, D and Kagiri, M (1992) Choosing the most appropriate method of construction with computer assistance. Construction Management and Economics, 10(2), pp. 153-177. ISSN 01446193
Scott, D and Krishnan, V (1983) Appropriate technology for Fiji. Construction Papers, 2(1), pp. 51-61. ISSN 0144-8587
Scott, J; Deveci, G; Edge, M and Martin, P (2004) Towards zero-heating: Affordable models for environmentally friendly housing in Scotland. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Scott, L (2012) A framework for formative assessment led learning strategies for built environment higher education. PhD thesis, University of Salford, UK.
Scott, L and Fortune, C (2009) A grounded approach to the investigation of assessment practices in built environment undergraduate programmes. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Scott, L and Fortune, C (2010) Reshaping assessment practices in built environment undergraduate programmes: What heads of department report. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Scott, L and Fortune, C (2011) Formative assessment practices in built environment higher education programmes and the enhancement of the student learning experience. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Scott, L and Fortune, C J (2012) Framework for formative assessment learning strategies in built environment higher education programmes. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Scott, L and Shaurette, M (2012) Developing an understanding of research principles to support post-graduate education in the built environment. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Scott, S (1991) Project plans and record-keeping on construction sites in the United Kingdom. PhD thesis, University of Newcastle upon Tyne, UK.
Scott, S (1993) The nature and effects of construction delays. Construction Management and Economics, 11(5), pp. 358-369. ISSN 01446193
Scott, S (1995) Checking the project plan. Construction Management and Economics, 13(2), pp. 127-136. ISSN 01446193
Scott, S (1997) Delay claims in UK contracts. Journal of Construction Engineering and Management, 123(3), pp. 238-244. ISSN 0733-9364
Scullion, J (2002) Are deep approaches to learning possible in vocational degree courses in construction? A phenomenological inquiry. EdD thesis, Open University, UK.
Seaden, G and Manseau, A (2001) Public policy and construction innovation. Building Research & Information, 29(3), pp. 182-196. ISSN 0961-3218
Sear, E A; Hartland, T G; Abdel-Wahab, M S and Miller, C G (2008) Implementing customer relationship management at constructionskills. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.
Selcuk, O; Turkoglu, H; Polat, G and Hajdu, M (2024) An integrative literature review on the causes of delays in construction projects: Evidence from developing countries. International Journal of Construction Management, 24(6), pp. 610-622. ISSN 1562-3599
Selinger, S (1983) Payment timing as a factor in bid evaluation. Journal of Construction Engineering and Management, 109(3), pp. 335-341. ISSN 0733-9364
Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988
Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599
Selvam, G and Tadepalli, T C M (2022) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management, 22(4), pp. 659-668. ISSN 1562-3599
Semasinghe, K.; Perera, S.; Nanayakkara, S.; Jin, X. and Samaratunga, M. (2026) Artificial intelligence-based strategies for indoor environmental quality optimisation. Smart and Sustainable Built Environment, pp. 1-31. ISSN 2046-6099
Semple, C; Hartman, F T and Jergeas, G (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), pp. 785-795. ISSN 0733-9364
Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. PhD thesis, University of Salford, UK.
Senaratne, S and Jayarathna, T (2012) Quality planning process of construction contractors: Case studies in Sri Lanka. Journal of Construction in Developing Countries, 17(1), pp. 103-115. ISSN 1823-6499
Senaratne, S and Pasqual, Y S (2011) Learning, teaching and research for construction undergraduate programmes: An exploratory case study in Sri Lanka. International Journal of Construction Management, 11(3), pp. 35-48. ISSN 1562-3599
Senaratne, S and Sexton, M G (2004) Managing construction project change in the knowledge age: A case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(2), pp. 186-200. ISSN 0969-9988
Senevirathne, M; Priyankara, H A C; Amaratunga, D; Haigh, R; Weerasinghe, N; Nawaratne, C and Kaklauskas, A (2021) A capacity needs assessment to integrate mooc-based climate change education with the higher education institutions in Europe and developing countries in Asia: Findings of the focused group survey in pchei under the beck project. International Journal of Disaster Resilience in the Built Environment, 12(5), pp. 515-527. ISSN 1759-5916
Senior, B A (1995) Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 397-403. ISSN 0733-9364
Senior, B A (1996) Electrical construction foreman task scheduling. Journal of Construction Engineering and Management, 122(4), pp. 363-369. ISSN 0733-9364
Senior, B A and Halpin, D W (1998) Simplified simulation system for construction projects. Journal of Construction Engineering and Management, 124(1), pp. 72-81. ISSN 0733-9364
Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.
Senouci, A and El-Rayes, K (2009) Time-profit trade-off analysis for construction projects. Journal of Construction Engineering and Management, 135(8), pp. 718-725. ISSN 0733-9364
Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364
Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364
Seppänen, O; Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(6), pp. 608-624. ISSN 01446193
Seppänen, O (2025) Integrated forecasting approach for takt and location-based scheduling. Journal of Construction Engineering and Management, 151(12): 04025199, ISSN 0733-9364
Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.
Sha, K; Song, T; Qi, X and Luo, N (2006) Rethinking China's urbanization: An institutional innovation perspective. Building Research & Information, 34(6), pp. 573-583. ISSN 0961-3218
Shabani Ardakani, S and Nik-Bakht, M (2021) Functional evaluation of change order and invoice management processes under different procurement strategies: Social network analysis approach. Journal of Construction Engineering and Management, 147(1): 1974, ISSN 0733-9364
Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.
Shafaat, A; Marbouti, F and Mahfouz, T (2023) Early warning system for highway construction projects using GA-SVM. International Journal of Construction Management, 23(14), pp. 2348-2357. ISSN 1562-3599
Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization. PhD thesis, University of Maryland, College Park, USA.
Shafiee, S; Piroozfar, P; Forberg, L F; Hansen, H N and Farr, E (2025) Enhancing efficiency and sustainability in construction: a product configurator for customizable off-site building solutions. Architectural Engineering and Design Management, 21(3), pp. 450-466. ISSN 1745-2007
Shah, M N; Dixit, S; Kumar, R; Jain, R and Anand, K (2021) Causes of delays in slum reconstruction projects in India. International Journal of Construction Management, 21(5), pp. 452-467. ISSN 1562-3599
Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.
Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X
Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction. PhD thesis, Purdue University, USA.
Shahedi, F. and Abrishami, S. (2026) Adaptive construction scheduling with AI in 4D/5D BIM: Integrating weather data and activity-based costing. Smart and Sustainable Built Environment, pp. 1-15. ISSN 2046-6099
Shahedi, F; Etemadfard, H; Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024114, ISSN 0733-9364
Shahrin, F; Mahmood, K and Hassan, F (2021) Project cost overruns and risk allocation in public funded projects in Malaysia. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Shahsavand, P; Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(4), pp. 497-533. ISSN 0969-9988
Shahtaheri, M; Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(1), pp. 40-60. ISSN 0969-9988
Shaked, O and Warszawski, A (1992) Consched: Expert system for scheduling of modular construction projects. Journal of Construction Engineering and Management, 118(3), pp. 488-506. ISSN 0733-9364
Shaker, R A; Elbeltagi, E; Motawa, I; Elmasoudi, I and Elnabwy, M T (2024) Social network analysis for identifying the significant drivers of off-site construction adoption in Egypt. Built Environment Project and Asset Management, 14(4), pp. 607-625. ISSN 2044-124X
Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(6), pp. 1004-1023. ISSN 0969-9988
Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.
Shalwani, A and Lines, B (2022) Using issue logs to improve construction project performance. Engineering, Construction and Architectural Management, 29(2), pp. 896-915. ISSN 0969-9988
Shalwani, A and Lines, B C (2021) An empirical analysis of the causes of cost and schedule growth for small healthcare and educational construction projects. International Journal of Construction Education and Research, 17(3), pp. 277-296. ISSN 1557-8771
Shalwani, A and Lines, B C (2021) An empirical analysis of issue management in small building construction projects. International Journal of Construction Education and Research, 17(4), pp. 352-372. ISSN 1557-8771
Shamp, P (2017) Scheduling strategies for construction project managers toward on time delivery. PhD thesis, Walden University, USA.
Shams, A. and Marzouk, M. (2026) Integrated time-cost-safety trade-off analysis and visual safety heat maps for enhanced construction performance. Journal of Construction Engineering and Management, 152(8): 04026114, ISSN 0733-9364
Shamsai, M; Whitlatch, E and Sezen, H (2007) Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management, 133(11), pp. 864-870. ISSN 0733-9364
Shamsollahi, D; Moselhi, O and Khorasani, K (2024) Automated detection and segmentation of mechanical, electrical, and plumbing components in indoor environments by using the yolact++ architecture. Journal of Construction Engineering and Management, 150(8): 04024100, ISSN 0733-9364
Shan, Y (2014) Integrated information modeling of construction project productivity. PhD thesis, University of Colorado at Boulder, USA.
Shan, Y; Goodrum, P M; Zhai, D; Haas, C and Caldas, C H (2011) The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), pp. 305-316. ISSN 1466433X
Shanbari, H; Blinn, N and Issa, R R A (2016) Using augmented reality video in enhancing masonry and roof component comprehension for construction management students. Engineering, Construction and Architectural Management, 23(6), pp. 765-781. ISSN 0969-9988
Shanmuganayagam, V (1989) Current float techniques for resources scheduling. Journal of Construction Engineering and Management, 115(3), pp. 401-411. ISSN 0733-9364
Shapira, A and Elbaz, A (2014) Tower crane cycle times: Case study of remote-control versus cab-control operation. Journal of Construction Engineering and Management, 140(12): 05014010, ISSN 0733-9364
Shapira, A; Filin, S and Wicnudel, A (2014) Quantitative analysis of blind tower-crane lifts using laser-scanning information. Construction Innovation, 14(3), pp. 383-403. ISSN 1471-4175
Shapira, A and Glascock, J D (1996) Culture of using mobile cranes for building construction. Journal of Construction Engineering and Management, 122(4), pp. 298-307. ISSN 0733-9364
Shapira, A; Rosenfeld, Y and Mizrahi, I (2008) Vision system for tower cranes. Journal of Construction Engineering and Management, 134(5), pp. 320-332. ISSN 0733-9364
Sharma, A K and Vohra, E (2009) Critical evaluation of road infrastructure in India: A cross-country view. Engineering, Construction and Architectural Management, 16(1), pp. 73-91. ISSN 0969-9988
Sharma, H; McIntyre, C; Gao, Z and Nguyen, T H (2009) Developing a traffic closure integrated linear schedule for highway rehabilitation projects. Journal of Construction Engineering and Management, 135(3), pp. 146-155. ISSN 0733-9364
Sharma, K K; Israel, D and Bhalla, B (2021) Does previous work experience matter in students' learning in higher project management education? Engineering, Construction and Architectural Management, 28(1), pp. 424-450. ISSN 0969-9988
Sharma, N and Laishram, B (2025) Decoding the emergent patterns of cost of quality through the lens of sociotechnical systems: A bibliometric analysis. Journal of Construction Engineering and Management, 151(4): 03125002, ISSN 0733-9364
Sharma, S; Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(4), pp. 299-314. ISSN 1562-3599
Sharma, V; Zaki, M; Jha, K N and Krishnan, N M A (2022) Machine learning-aided cost prediction and optimization in construction operations. Engineering, Construction and Architectural Management, 29(3), pp. 1241-1257. ISSN 0969-9988
Sharp, M and Jones, K (2012) Perceived inefficiency in social housing maintenance. Construction Innovation, 12(4), pp. 414-428. ISSN 1471-4175
Shash, A A and AbuAlnaja, F M (2023) Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management, 23(7), pp. 1109-1117. ISSN 1562-3599
Shash, A A and Ahcom, J (2006) Organizational aspects of planning and scheduling subsystem. Journal of Construction Research, 7(1), pp. 247-265. ISSN 1609-9451
Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.
Shawa, H H (1995) Project related finance for construction contractors operating in the United Arab Emirates. PhD thesis, Loughborough University, UK.
Shayboun, M; Kifokeris, D and Koch, C (2019) Construction planning with machine learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Shebob, A (2012) Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya. PhD thesis, Teesside University, UK.
Shebob, A; Dawood, N; Shah, R K and Xu, Q (2012) Comparative study of delay factors in Libyan and the UK construction industry. Engineering, Construction and Architectural Management, 19(6), pp. 688-712. ISSN 0969-9988
Shebob, A; Dawood, N and Xu, Q (2011) Analysing construction delay factors: A case study of building construction project in Libya. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Shehab, T (2009) Automated measurement of earthwork volume in construction projects. Construction Innovation, 9(3), pp. 341-358. ISSN 1471-4175
Shehab, T and Farooq, M (2013) Neural network cost estimating model for utility rehabilitation projects. Engineering, Construction and Architectural Management, 20(2), pp. 118-126. ISSN 0969-9988
Shehu, Z (2008) The framework for effective adoption and implementation of programme management within the UK construction industry. PhD thesis, Glasgow Caledonian University, UK.
Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X
Sheikhkhoshkar, M; Bril El-Haouzi, H; Aubry, A and Hamzeh, F (2023) Functionality as a key concept for integrated project planning and scheduling methods. Journal of Construction Engineering and Management, 149(7): 04023053, ISSN 0733-9364
Shelake, A G and Gogate, N G (2026) An integrated risk prioritization and determination of activity-wise delay (irpad) framework for enhancing schedule management in tunnel projects. Engineering, Construction and Architectural Management, 33(1), pp. 763-784. ISSN 0969-9988
Shen, L and Cheung, S O (2018) How forming joint ventures may affect market concentration in construction industry? International Journal of Construction Management, 18(2), pp. 151-162. ISSN 1562-3599
Shen, L; Drew, D and Zhang, Z (1999) Optimal bid model for price-time biparameter construction contracts. Journal of Construction Engineering and Management, 125(3), pp. 204-209. ISSN 0733-9364
Shen, L Y (1990) Application of risk management to the Chinese construction industry. PhD thesis, University of Reading, UK.
Shen, Q; Lo, K K and Wang, Q (1998) Priority setting in maintenance management: A modified multi-attribute approach using analytic hierarchy process. Construction Management and Economics, 16(6), pp. 693-702. ISSN 01446193
Shen, W; Tang, W; Wang, Y; Duffield, C F; Hui, F K P and Zhang, L (2021) Managing interfaces in large-scale projects: The roles of formal governance and partnering. Journal of Construction Engineering and Management, 147(7): 04021064, ISSN 0733-9364
Shen, X; Lu, M and Chen, W (2011) Tunnel-boring machine positioning during microtunneling operations through integrating automated data collection with real-time computing. Journal of Construction Engineering and Management, 137(1), pp. 72-85. ISSN 0733-9364
Shen, Xiaohan (2025) Vision-based information management using digital construction knowledge graphs to integrate data in digital twins for prefabricated construction. PhD thesis, University of New South Wales, Australia.
Shen, Z and Wu, J (2025) Multiobjective ant colony system algorithm for component-level construction schedule optimization. Journal of Construction Engineering and Management, 151(3): 04025002, ISSN 0733-9364
Shepherd, S and Woskie, S R (2010) Case study to identify barriers and incentives to implementing an engineering control for concrete grinding dust. Journal of Construction Engineering and Management, 136(11), pp. 1238-1248. ISSN 0733-9364
Sherafat, Behnam (2022) Acoustical modeling of construction jobsites with multiple operational machines for activity recognition and productivity analysis. PhD thesis, University of Utah, USA.
Sherman, R; Gibson, G E; Merrow, E and Parrish, K (2021) Examining the impact of rate-of-return regulation on capital project planning. Journal of Construction Engineering and Management, 147(8): 04021080, ISSN 0733-9364
Sherman, Rachael Paige (2020) Assessing the impact of regulation on the performance of power and pipeline projects. PhD thesis, Arizona State University, USA.
Sherratt, F (2013) Et in arcadia ego? 'Zero target' safety programmes in the UK construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Sherratt, F (2014) Exploring 'zero target' safety programmes in the UK construction industry. Construction Management and Economics, 32(7-8), pp. 737-748. ISSN 01446193
Sherratt, F (2015) Legitimizing public health control on sites? A critical discourse analysis of the responsibility deal construction pledge. Construction Management and Economics, 33(5-6), pp. 444-452. ISSN 01446193
Sherratt, F; Dowsett, R and Sherratt, S (2020) Construction 4.0 and its potential impact on people working in the construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 145-152. ISSN 17514304
Sherratt, F; Farrell, P and Noble, R (2011) A constructionist examination of construction site culture: Review of a pilot study. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Sherratt, F; Farrell, P and Noble, R (2013) UK construction site safety: Discourses of enforcement and engagement. Construction Management and Economics, 31(6), pp. 623-635. ISSN 1466433X
Sherratt, F S (2012) Constructing safety on sites: an exploration of the social construction of safety on large UK construction sites. PhD thesis, University of Bolton, UK.
Sheth, A; Price, A D F; Glass, J and Achour, N (2008) Reviewing the sustainability of existing healthcare facilities. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Shewchuk, J P and Guo, C (2012) Panel stacking, panel sequencing, and stack locating in residential construction: Lean approach. Journal of Construction Engineering and Management, 138(9), pp. 1006-1016. ISSN 0733-9364
Shi, J J (1999) Activity-based construction (ABC) modeling and simulation method. Journal of Construction Engineering and Management, 125(5), pp. 354-360. ISSN 0733-9364
Shi, J J (2002) Three methods for verifying and validating the simulation of a construction operation. Construction Management and Economics, 20(6), pp. 483-491. ISSN 01446193
Shi, J J; Cheung, S O and Arditi, A (2001) Construction delay computation method. Journal of Construction Engineering and Management, 127(1), pp. 60-65. ISSN 0733-9364
Shi, Q; Yu, J; Zhang, L; Su, Y; Wang, J and Kong, Q (2025) An optimization model for the duration of workshop production processes for precast concrete components for highway projects. International Journal of Construction Management, 25(7), pp. 813-825. ISSN 1562-3599
Shi, Q; Zuo, J and Zillante, G (2012) Exploring the management of sustainable construction at the programme level: A Chinese case study. Construction Management and Economics, 30(6), pp. 425-440. ISSN 1466433X
Shibeika, A; Davies, R and Gray, C (2009) Care pathways and the built environment: Conceptual framework for understanding. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Shibeika, A and Harty, C (2015) Digital innovation in construction: Exploring the firm-projects interface. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Shieh, E; Habibi, K; Torabi, K and Masoumi, H E (2014) Earthquake risk in urban street network: An example from region 6 of Tehran, Iran. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 413-426. ISSN 1759-5916
Shiers, D; Rapson, D; Roberts, C and Keeping, M (2006) Sustainable construction: The development and evaluation of an environmental profiling system for construction products. Construction Management and Economics, 24(11), pp. 1177-1184. ISSN 1466433X
Shih, N J and Huang, S T (2006) 3D scan information management system for construction management. Journal of Construction Engineering and Management, 132(2), pp. 134-142. ISSN 0733-9364
Shikhrobat, M B; Kabiri, S and Flanagan, R (2019) Project planning and scheduling using system dynamics for dealing with complexity on construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Shim, E and Kim, B C (2014) Batch-size based repetitive scheduling method (BRSM). International Journal of Construction Education and Research, 10(2), pp. 140-156. ISSN 1557-8771
Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.
Shin, Y J; Farrokh, E; Jung, J and Kang, H (2025) Optimizing tunnel boring machine operations in real time within defined constraints. Journal of Construction Engineering and Management, 151(6): 04025042, ISSN 0733-9364
Shiplee, H; Peacop, D and Payne, R (2013) Delivering London 2012: Site-wide logistics. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 165-178. ISSN 17514312
Shipworth, M; Firth, S K; Gentry, M I; Wright, A J; Shipworth, D T and Lomas, K J (2010) Central heating thermostat settings and timing: Building demographics. Building Research & Information, 38(1), pp. 50-69. ISSN 0961-3218
Shirazi, D H and Toosi, H (2023) Deep multilayer perceptron neural network for the prediction of Iranian dam project delay risks. Journal of Construction Engineering and Management, 149(4): 04023011, ISSN 0733-9364
Shirong, L (1996) New approach for optimization of overall construction schedule. Journal of Construction Engineering and Management, 122(1), pp. 7-13. ISSN 0733-9364
Shiue, F J; Lee, H Y; Zheng, M C; Khitam, A F K and Assefa, S (2021) An estimation model of construction project segmentation for optimum project pricing. Engineering, Construction and Architectural Management, 28(9), pp. 2361-2380. ISSN 0969-9988
Shohet, I M and Frydman, S (2003) Communication patterns in construction at construction manager level. Journal of Construction Engineering and Management, 129(5), pp. 570-577. ISSN 0733-9364
Shohet, I M; Puterman, M and Gilboa, E (2002) Deterioration patterns of building cladding components for maintenance management. Construction Management and Economics, 20(4), pp. 305-314. ISSN 01446193
Shojaei Kol Kachi, A (2017) Extending the portfolio and strategic planning horizon by the stochastic forecasting of unknown future projects: A FDOT case study. PhD thesis, University of Florida, USA.
Shokri, S; Haas, C T; Haas, R C G and Lee, S H (2016) Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142(2): 04015069, ISSN 0733-9364
Shokri-Ghasabeh, M and Chileshe, N (2016) Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(2), pp. 127-157. ISSN 1471-4175
Short, C A (2008) What is 'architectural design research'? Building Research & Information, 36(2), pp. 195-199. ISSN 0961-3218
Short, C A and Lomas, K J (2007) Exploiting a hybrid environmental design strategy in a US continental climate. Building Research & Information, 35(2), pp. 119-143. ISSN 0961-3218
Short, K M (2013) The impact of experiential learning: Assessing the outcomes of internship experiences for students entering the construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Shourkabi, A (2016) A study of designer time utilisation in Iranian construction consultancies. PhD thesis, Loughborough University, UK.
Shr, J F and Chen, W T (2004) Setting maximum incentive for incentive/disincentive contracts for highway projects. Journal of Construction Engineering and Management, 130(1), pp. 84-93. ISSN 0733-9364
Shr, J F; Ran, B and Sung, C W (2004) Method to determine minimum contract bid for A + B+ I/D highway projects. Journal of Construction Engineering and Management, 130(4), pp. 509-516. ISSN 0733-9364
Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.
Shrahily, R; Medjdoub, B; Klalib, H; Chalal, M and Alwetaishi, M (2022) Managing construction site communication using the responsibility assignment matrix (RAM) system. International Journal of Construction Management, 22(15), pp. 2966-2986. ISSN 1562-3599
Shrestha, B (2024) Assessment of success factors and comparative analysis of public private partnership (P3) project performances against design-build and design-bid-build project delivery. PhD thesis, University of Nevada, Las Vegas, USA.
Shrestha, H D; Yatabe, R; Bhandary, N P and Subedi, J (2012) Vulnerability assessment and retrofitting of existing school buildings: A case study of Aceh. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 52-65. ISSN 1759-5916
Shrestha, K and Shrestha, P P (2022) Framework to implement performance-based contracting for chip-seal road maintenance. Journal of Construction Engineering and Management, 148(1): 04021183, ISSN 0733-9364
Shrestha, K K (2016) Causes of change orders and its impact on road maintenance contracts. PhD thesis, University of Nevada, Las Vegas, USA.
Shrestha, K P (2016) Data analytics and visualization for enhanced highway construction cost indexes and as-built schedules. PhD thesis, Iowa State University, USA.
Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364
Shrestha, P P and Fernane, J D (2017) Performance of design-build and design-bid-build projects for public universities. Journal of Construction Engineering and Management, 143(3): 04016101, ISSN 0733-9364
Shrestha, P P; Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(6), pp. 1087-1104. ISSN 0969-9988
Shrivastava, R (2020) Development of risk management model for construction of railway project in India. PhD thesis, University of Petroleum and Energy Studies, India.
Shtub, A (1988) The integration of CPM and material management in project management. Construction Management and Economics, 6(4), pp. 261-272. ISSN 01446193
Shu-Shun, L and Shih, K C (2009) A framework of critical resource chain for project schedule analysis. Construction Management and Economics, 27(9), pp. 857-869. ISSN 1466433X
Shugran, A A and Ghazali, F E M (2025) Understanding the effects of variation orders on construction project success: insights from the Jordanian context. International Journal of Construction Management, 25(5), pp. 519-529. ISSN 1562-3599
Sica, F; Tajani, F and Cerullo, G (2025) An evaluation model for an optimal decarbonisation process in the built environment. Built Environment Project and Asset Management, 15(1), pp. 51-66. ISSN 2044-124X
Sidawi, B and Deakin, M (2013) Diabetes, built environments and (un)healthy lifestyles:The potential of smart city technologies. Smart and Sustainable Built Environment, 2(3), pp. 311-323. ISSN 2046-6099
Siddika, A and Lu, M (2023) Project schedule acceleration optimization integrated with energy source-based assessment of occupational health and safety risks. Journal of Construction Engineering and Management, 149(12): 04023120, ISSN 0733-9364
Siddiqui, M K (2008) Coordination of distributed schedules in a heterogeneous environment: identification of conflicts using schedule mappings. PhD thesis, University of Texas at Austin, USA.
Silveira, B F and Costa, D B (2024) Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System. Construction Innovation, 24(4), pp. 1005-1025. ISSN 1471-4175
Simkoko, E E (1989) Analysis of factors impacting technology transfer in construction projects: Case studies from developing countries. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.
Simon, L; Jefferies, M; Davis, P and Newaz, M T (2020) Developing a theoretical success factor framework for the tendering phase of social infrastructure PPPs. International Journal of Construction Management, 20(6), pp. 613-627. ISSN 1562-3599
Simpson, K; Murtagh, N and Owen, A (2021) Domestic retrofit: Understanding capabilities of micro-enterprise building practitioners. Buildings & Cities, 2(1), pp. 449-466. ISSN 2632-6655
Simpson, Y (2014) The potential impact of the HE Educational White Paper 2011 on higher education and professional construction education: professional quantity surveying education in England. PhD thesis, University of Greenwich, UK.
Simukonda, W (2019) Occupational health and safety practices among contractors in Malawi: A generic overview. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(3), pp. 118-124. ISSN 17514304
Simushi, S and Wium, J (2020) Time and cost overruns on large projects: Understanding the root cause. Journal of Construction in Developing Countries, 25(1), pp. 129-146. ISSN 1823-6499
Sindhu, J; Choi, K; Lavy, S; Rybkowski, Z K; Bigelow, B F and Li, W (2018) Effects of front-end planning under fast-tracked project delivery systems for industrial projects. International Journal of Construction Education and Research, 14(3), pp. 163-178. ISSN 1557-8771
Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.
Sinesilassie, E G; Tabish, S Z S and Jha, K N (2017) Critical factors affecting schedule performance: A case of Ethiopian public construction projects: Engineers' perspective. Engineering, Construction and Architectural Management, 24(5), pp. 757-773. ISSN 0969-9988
Singh, A (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(5), pp. 312-321. ISSN 0969-9988
Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(6), pp. 507-530.
Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364
Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Singh, J; Cheng, J C P and Anumba, C J (2021) BIM-based approach for automatic pipe systems installation coordination and schedule optimization. Journal of Construction Engineering and Management, 147(11): 04021143, ISSN 0733-9364
Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029
Singh, S; Chinyio, E and Suresh, S (2018) The implementation of stakeholder management and building information modelling (BIM) in UK construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.
Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364
Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 0969-9988
Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.
Siriwardena, N (2012) Managing stakeholder needs and expectations in a post-disaster housing reconstruction scenario. PhD thesis, University of Salford, UK.
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364
Siu, M F F; Lu, M and Abourizk, S (2016) Resource supply-demand matching scheduling approach for construction workface planning. Journal of Construction Engineering and Management, 142(1): 04015048, ISSN 0733-9364
Skaik, Samer Hisham (2017) Introducing review mechanisms into statutory construction adjudication. PhD thesis, Deakin University, Australia.
Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193
Skibniewski, M J (1991) Information management system for new construction technologies. Construction Management and Economics, 9(1), pp. 39-49. ISSN 01446193
Skinnarland, S (2013) Use of progression planning tools in developing collaborative main contractor-subcontractor relationships in Norway. PhD thesis, Heriot-Watt University, UK.
Skinner, D W H (1974) An investigation of the contractor's use of bills of quantities. PhD thesis, Aston University, UK.
Skitmore, M (1992) Parameter prediction for cash flow forecasting models. Construction Management and Economics, 10(5), pp. 397-413. ISSN 01446193
Slaughter, E S (2001) Design strategies to increase building flexibility. Building Research & Information, 29(3), pp. 208-217. ISSN 0961-3218
Smailes, R L (2000) Building chan chan: The application of construction project management to the analysis of ancient architecture. PhD thesis, University of Florida, USA.
Smalley, L J (1987) Project management in the republic of South Africa. DCom thesis, University of South Africa, South Africa.
Smallwood, J (2005) The role of optimum health and safety (H&S) in construction marketing. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Smallwood, J and Allen, C (2020) The impact of a first-year orientation team building exercise. Construction Economics and Building, 20(3), pp. 142-159. ISSN 2204-9029
Smallwood, J and Emuze, F (2012) The integration of diplomates and graduates into the construction industry: A pilot South African study. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Smallwood, J J (2002) The influence of health and safety (H&S) culture on H&S performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Smallwood, J J (2004) The influence of clients on contractor health and safety (H&S). In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Smallwood, J J and Allen, C J (2020) The impact of a first-year orientation team building event: A longitudinal review. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Smallwood, J J; Allen, C J and Deacon, C H (2020) The role of industry 4.0 in construction occupational health (OH). In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Smallwood, J J and Cumberlege, R (2016) Construction management and quantity surveying students perceptions towards production analysis and measuring quantities for construction purposes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Smallwood, J J and Emuze, F (2016) Factors that promote zero fatalities, injuries, and disease in construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Smallwood, J J and Emuze, F A (2011) Core competencies and the practice of construction management: A pilot South African study. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Smallwood, J J and Haupt, T C (2007) Impact of the South African construction regulations on construction health and safety: Architects' perceptions. Journal of Engineering, Design and Technology, 5(1), pp. 23-34. ISSN 1726-0531
Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.
Smith, G and Ceranic, B (2008) Spatial layout planning in sub-surface rail station design for effective fire evacuation. Architectural Engineering and Design Management, 4(2), pp. 99-120. ISSN 1745-2007
Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks). PhD thesis, Purdue University, USA.
Smith, G R and Hancher, D E (1989) Estimating precipitation impacts for scheduling. Journal of Construction Engineering and Management, 115(4), pp. 552-566. ISSN 0733-9364
Smith, J P (2013) Trust-building in the construction project delivery process: A relational lookahead tool for managing trust. PhD thesis, Texas A&M University, USA.
Smith, N J (1986) The study of criticality: An investigation based on network theory into the relationship between time and cost in civil engineering bridgeworks contracts and the measurement of the effects of change. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Smith, R E; Griffin, G; Rice, T and Hagehofer-Daniell, B (2018) Mass timber: Evaluating construction performance. Architectural Engineering and Design Management, 14(1-2), pp. 127-138. ISSN 1745-2007
Smith, S D; Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(2), pp. 219-228. ISSN 01446193
Smyth, H (2010) Construction industry performance improvement programmes: The UK case of demonstration projects in the 'continuous improvement' programme. Construction Management and Economics, 28(3), pp. 255-270. ISSN 1466433X
Sodangi, M (2023) Towards attaining efficient joint ventures in international construction: The case of saudi Arabia. Engineering, Construction and Architectural Management, 30(6), pp. 2545-2563. ISSN 0969-9988
Sodeinde, G M (2021) Effect of entrepreneurial innovation on the performance of informal sector: A study of carpentry firms in Lagos State. PhD thesis, Kwara State University, Nigeria.
Soe, Y (2017) Construction supply chain risk management framework for construction projects: case studies in Myanmar. PhD thesis, University of Birmingham, UK.
Soetanto, R; Glass, J; Dainty, A R J and Price, A D F (2007) Structural frame selection: Case studies of hybrid concrete frames. Building Research & Information, 35(2), pp. 206-219. ISSN 0961-3218
Soh, I (2003) The acquisition and analysis of time management perception in the architectural domain. PhD thesis, Texas A&M University, USA.
Sohail, M and Edum-Fotwe, F T (2000) Cost-duration tool for policy decision on micro and small projects. Journal of Financial Management of Property and Construction, 5(3), pp. 111-122. ISSN 1366-4387
Sohn, T (2009) Determining durations for right-of-way acquisition and utility adjustment on highway projects. PhD thesis, University of Texas at Austin, USA.
Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(2), pp. 544-570. ISSN 0969-9988
Sohrabi, M (2025) Statistical methods for enhanced coastal flood risk assessment and adaptation planning. PhD thesis, University of Alabama, USA.
Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.
Soliman, E M (2005) Delay hierarchy propagation model. PhD thesis, University of Plymouth, UK.
Somiah, M K (2018) An integrated competitive advantage model for indigenous construction firms in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model. PhD thesis, Purdue University, USA.
Son, J (2011) An integrated model of evolution of project teams in large-scale construction projects. PhD thesis, University of Washington, USA.
Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364
Son, J and Mattila, K G (2004) Binary resource leveling model: Activity splitting allowed. Journal of Construction Engineering and Management, 130(6), pp. 887-894. ISSN 0733-9364
Son, J and Rojas, E M (2011) Impact of optimism bias regarding organizational dynamics on project planning and control. Journal of Construction Engineering and Management, 137(2), pp. 147-157. ISSN 0733-9364
Son, J and Skibniewski, M J (1999) Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1), pp. 23-31. ISSN 0733-9364
Song, J and Müller, B (2022) Integrating climate change and urban regeneration: Success stories from Seoul. Buildings & Cities, 3(1), pp. 874-894. ISSN 2632-6655
Song, L and Abourizk, S M (2008) Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134(10), pp. 786-794. ISSN 0733-9364
Song, Y and Chua, D K H (2007) Temporal logic representation schema for intermediate function. Journal of Construction Engineering and Management, 133(4), pp. 277-286. ISSN 0733-9364
Song, Y and Chua, D K H (2011) Requirement and availability time-window analysis of intermediate function. Journal of Construction Engineering and Management, 137(11), pp. 967-975. ISSN 0733-9364
Songer, A D (1992) Toward an improved understanding of public sector design-build planning. PhD thesis, University of California, Berkeley, USA.
Songer, A D; Diekmann, J E and Karet, D (2001) Animation-based construction schedule review. Construction Innovation, 1(3), pp. 181-190. ISSN 1471-4175
Songer, A D; Diekmann, J E; Rasheed, K A and Hays, B (2001) Construction scheduling using 3-D CAD and walk-thru. Construction Innovation, 1(3), pp. 191-207. ISSN 1471-4175
Songer, A D; Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(2), pp. 69-82. ISSN 1358-9180
Sonmez, R; Aminbakhsh, S and Atan, T (2020) Activity uncrashing heuristic with noncritical activity rescheduling method for the discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 146(8): 1870, ISSN 0733-9364
Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364
Soo, Alexander (2015) The effect of construction demand on inexperienced bidders' bidding behaviour. PhD thesis, University of Sydney, Australia.
Sospeter, N G; Rwelamila, P D; Nchimbi, M and Masoud, M (2014) Review of theory and practice literature on women entrepreneurship in the Tanzanian construction industry: Establishing the missing link. Journal of Construction in Developing Countries, 19(2), pp. 75-85. ISSN 1823-6499
Sossah, J Y; Osei-Poku, G and Dorhetso, S N (2026) Exploring the feasibility of adopting autonomous drones for construction progress monitoring in Ghana. International Journal of Construction Management, 26(3), pp. 412-427. ISSN 1562-3599
Soto Ortiz, S.; Kang, K.; Hubbard, B. and Besiktepe, D. (2026) Supply chain disruption risks in U.S. Construction industry: Post-pandemic perspectives. Construction Management and Economics, 44(9), pp. 703-720. ISSN 0144-6193
Sourav, M M I; Russedul Islam, M; Mohibur Rahman, S and Istiak Jahan, M (2025) Heterogeneity in stakeholder's perceptions on delays in infrastructure projects: Scenario of Bangladesh. Engineering, Construction and Architectural Management, 32(6), pp. 3883-3913. ISSN 0969-9988
Sousa, V; Almeida, N M and Dias, L A (2014) Role of statistics and engineering judgment in developing optimized time-cost relationship models. Journal of Construction Engineering and Management, 140(8): 04014034, ISSN 0733-9364
Sousa, V; Almeida, N M; Dias, L A and Branco, F A (2014) Risk-informed time-cost relationship models for sanitation projects. Journal of Construction Engineering and Management, 140(5): 06014002, ISSN 0733-9364
Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. PhD thesis, University of Manchester, UK.
Spaulding, W M; Bridge, A and Skitmore, M (2005) The use of function analysis as the basis of value management in the Australian construction industry. Construction Management and Economics, 23(7), pp. 723-731. ISSN 01446193
Spence, R (2004) Risk and regulation: Can improved government action reduce the impacts of natural disasters? Building Research & Information, 32(5), pp. 391-402. ISSN 0961-3218
Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.
Srijaroen, C; Hoy, M; Horpibulsuk, S; Rachan, R and Arulrajah, A (2021) Soil-cement screw pile: Alternative pile for low- and medium-rise buildings in soft bangkok clay. Journal of Construction Engineering and Management, 147(2): 1988, ISSN 0733-9364
Srisethanil, C (1996) Pedagogical framework for an engineering intelligent tutoring system. PhD thesis, Georgia Institute of Technology, USA.
Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations. PhD thesis, University of Michigan, USA.
Srour, I M; Haas, C T and Morton, D P (2006) Linear programming approach to optimize strategic investment in the construction workforce. Journal of Construction Engineering and Management, 132(11), pp. 1158-1166. ISSN 0733-9364
Ssegawa, J K and Rwelamila, P D (2009) Gaps in construction project management education programmes within sadc: Lessons for educators. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Ssegawa, J K; Rwelamila, P D and Mogome, M G (2020) The challenges of closing construction projects final accounts in Botswana local authorities. Journal of Construction Business and Management, 4(1), pp. 13-23. ISSN 2521-0165
Ssegawa-Kaggwa, J; Ngowi, A B and Ntshwene, K (2013) Using a situation analysis to identify the construction industry deficiencies in Botswana. Journal of Construction in Developing Countries, 18(1), pp. 1-18. ISSN 1823-6499
Stamatiadis, N; Goodrum, P; Shocklee, E and Wang, C (2014) Quantitative analysis of state transportation agency's experience with constructability reviews. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364
Standing, N A (1999) Value engineering and the contractor. PhD thesis, University of Leeds, UK.
Standinger, M L (2000) The evaluation of time claims in construction projects. PhD thesis, Loughborough University, UK.
Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction. PhD thesis, University of Colorado at Boulder, USA.
Stanley, Hannah J (2017) Airport planning and stakeholder engagement: An international comparison. PhD thesis, Queensland University of Technology, Australia.
Staples, C and Spillane, J (2019) Exploring the potential improvement of quality control in the construction industry with the use of digital technology. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.
Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications. PhD thesis, KTH Royal Institute of Technology, Sweden.
Stephenson, P; Morrey, I; Vacher, P and Ahmed, Z (2002) Acquisition and structuring of knowledge for defect prediction in brickwork mortar. Engineering, Construction and Architectural Management, 9(5-6), pp. 396-408. ISSN 0969-9988
Stevens, F J (2016) A comparative analysis of the percentage completion project methodology and the stevens earned value instrument. DBA thesis, Wilmington University (Delaware), USA.
Stevens, J D (1981) A study of the relationship between perturbations in construction time schedules and potential construction claims. PhD thesis, University of Washington, USA.
Stevenson, F (2019) Embedding building performance evaluation in UK architectural practice and beyond. Building Research & Information, 47(3), pp. 305-317. ISSN 0961-3218
Stevenson, F and Baborska-Narozny, M (2018) Housing performance evaluation: Challenges for international knowledge exchange. Building Research & Information, 46(5), pp. 501-512. ISSN 0961-3218
Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: A case study. Construction Management and Economics, 24(4), pp. 339-348. ISSN 01446193
Stickley, A; Christensen, S; Duncan, W D and Buchbach, J (2016) Predictive technology and natural hazards: Risk for Australian planning authorities? International Journal of Law in the Built Environment, 8(1), pp. 42-55. ISSN 1756-1450
Stiles, S (2019) Investigation of safety leadership within infrastructure engineering construction projects. PhD thesis, University of Nottingham, UK.
Stockings, W H (2002) The process of construction planning. PhD thesis, Eindhoven University of Technology, Netherlands.
Stoneman, G; Hill, C J; Howarth, T and McNamara, T (1999) Construction planning software selection for improving the planning process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Stoy, C; Dreier, F and Schalcher, H R (2007) Construction duration of residential building projects in Germany. Engineering, Construction and Architectural Management, 14(1), pp. 52-64. ISSN 0969-9988
Stoy, C; Pollalis, S and Schalcher, H R (2008) Drivers for cost estimating in early design: Case study of residential construction. Journal of Construction Engineering and Management, 134(1), pp. 32-39. ISSN 0733-9364
Stoy, C and Schalcher, H R (2007) Residential building projects: Building cost indicators and drivers. Journal of Construction Engineering and Management, 133(2), pp. 139-145. ISSN 0733-9364
Strasheim, B and Hugo, F (2013) A programme for continuing professional development of managers in the construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 313-322. ISSN 17514312
Strengers, Y; Dahlgren, K and Nicholls, L (2022) Emerging technologies' impacts on 'man caves' and their energy demand. Buildings & Cities, 3(1), pp. 503-517. ISSN 2632-6655
Strengers, Y and Maller, C (2011) Integrating health, housing and energy policies: Social practices of cooling. Building Research & Information, 39(2), pp. 154-168. ISSN 0961-3218
Stringer, A; Dunne, J and Boussabaine, H (2012) Schools design quality: A user perspective. Architectural Engineering and Design Management, 8(4), pp. 257-272. ISSN 1745-2007
Stukhart, G (1984) Contractual incentives. Journal of Construction Engineering and Management, 110(1), pp. 34-42. ISSN 0733-9364
Sturts Dossick, C and Schunk, T K (2007) Subcontractor schedule control method. Journal of Construction Engineering and Management, 133(3), pp. 262-265. ISSN 0733-9364
Styhre, A and Josephson, P E (2007) Coaching the site manager: Effects on learning and managerial practice. Construction Management and Economics, 25(12), pp. 1295-1304. ISSN 1466433X
Su, C T; Santoro, M C and Mendes, A B (2018) Constructive heuristics for project scheduling resource availability cost problem with tardiness. Journal of Construction Engineering and Management, 144(8): 04018074, ISSN 0733-9364
Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.
Su, X; Li, S; Yuan, C; Cai, H and Kamat, V R (2014) Enhanced boundary condition-based approach for construction location sensing using RFID and RTK GPS. Journal of Construction Engineering and Management, 140(10): 04014048, ISSN 0733-9364
Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.
Su, Y; Isaac, S and Lucko, G (2018) Integrated temporal-spatial model for construction plans with boolean logic operators. Journal of Construction Engineering and Management, 144(4): 04018009, ISSN 0733-9364
Su, Y and Lucko, G (2015) Optimum present value scheduling based on synthetic cash flow model with singularity functions. Journal of Construction Engineering and Management, 141(11): 04015036, ISSN 0733-9364
Su, Y; Lucko, G and Thompson, R C (2018) Application of voting theory to the float ownership problem. Journal of Construction Engineering and Management, 144(1): 04017094, ISSN 0733-9364
Su, Y S (2017) Rebuild, retreat or resilience: Urban flood vulnerability analysis and simulation in Taipei. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 110-122. ISSN 1759-5916
Su, Z X; Wei, H Y; Zou, X and Qi, J X (2019) Zero-one formulation for a partial resource-constrained project scheduling problem with generalized precedence relations. Journal of Construction Engineering and Management, 145(3): 04018142, ISSN 0733-9364
Subbiah, A (2012) An investigation of the factors influencing the success of construction planning for the 2012 olympic stadium: An ethnographic study. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Suchowerska, R; Loosemore, M and Barraket, J (2024) How employment-focused social procurement tackles health inequities: An investigation of Australia’s construction industry using determinants of health theory. Construction Management and Economics, 42(11-12), pp. 977-991. ISSN 01446193
Suckarieh, G (1984) Construction management control with microcomputers. Journal of Construction Engineering and Management, 110(1), pp. 72-78. ISSN 0733-9364
Sugar, K; Mose, T M; Nolden, C; Davis, M; Eyre, N; Sanchez-Graells, A and van der Horst, D (2022) Local decarbonisation opportunities and barriers: UK public procurement legislation. Buildings & Cities, 3(1), pp. 895-911. ISSN 2632-6655
Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.
Suhail, S A (1995) CPM/LOB: new methodology to integrate CPM and line of balance. PhD thesis, Loughborough University, UK.
Suhail, S A and Neale, R H (1994) CPM/LOB: New methodology to integrate CPM and line of balance. Journal of Construction Engineering and Management, 120(3), pp. 667-684. ISSN 0733-9364
Suleiman, M Z; Talib, R and Ramli, M (2013) Durability and flexibility characteristics of latex modified ferrocement in structural development applications. Journal of Engineering, Design and Technology, 11(1), pp. 59-70. ISSN 1726-0531
Sullivan, J; Asmar, M E; Chalhoub, J and Obeid, H (2017) Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6): 04017009, ISSN 0733-9364
Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Sumanohar, Symon (2022) Statistical approach towards complexities resolution for design, building, and operation of data centers. DBA thesis, American Business Management and Technology College, Switzerland.
Sun, C; MacKley, A and Edara, P (2014) Programmatic examination of missouri incentive/disincentive contracts for mitigating work zone traffic impacts. Journal of Construction Engineering and Management, 140(1): 05013004, ISSN 0733-9364
Sun, C and Xu, J (2011) Estimation of time for wenchuan earthquake reconstruction in China. Journal of Construction Engineering and Management, 137(3), pp. 179-187. ISSN 0733-9364
Sun, Jing (2020) Green infrastructure design and evaluation model for resilient sponge city program transitional construction. PhD thesis, University of Nottingham, UK.
Sun, M; Fleming, A; Senaratne, S; Motawa, I and Yeoh, M L (2006) A change management toolkit for construction projects. Architectural Engineering and Design Management, 2(4), pp. 261-271. ISSN 1745-2007
Sunarharum, T M; Sloan, M and Susilawati, C (2014) Re-framing planning decision-making: Increasing flood resilience in Jakarta. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 230-242. ISSN 1759-5916
Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing. PhD thesis, Indian Institute of Technology Delhi, India.
Sundararajan, S K (2004) Project performance-based optimal capital structure for privately financed infrastructure projects. PhD thesis, University of Maryland, College Park, USA.
Sunday, O A (2010) Impact of variation orders on public construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Sundling, R (2019) A development process for extending buildings vertically – based on a case study of four extended buildings. Construction Innovation, 19(3), pp. 367-385. ISSN 1471-4175
Sunikka-Blank, M; Purohit, R and Samuel, F (2025) Co-curation as civic practice in community engagement. Buildings & Cities, 6(1), pp. 899-916. ISSN 2632-6655
Sunindijo, R Y and Zou, P X W (2011) Influence of technical skill on safety task implementation and safety climate development in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Sunkanmi, A B (2023) An integrated conflict management model for the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.
Suresh, S (2006) Knowledge capture in small and medium enterprises in the UK construction industry. PhD thesis, Glasgow Caledonian University, UK.
Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.
Suárez, J L; Gosselin, L and Lehoux, N (2023) Analysing value creation in social housing construction in remote communities: application to nunavik (Canada). Built Environment Project and Asset Management, 13(4), pp. 493-508. ISSN 2044-124X
Swaffield, J A (2005) Transient identification of defective trap seals. Building Research & Information, 33(3), pp. 245-256. ISSN 0961-3218
Swallow, M and Zulu, S (2020) Students’ awareness and perception of the value of BIM and 4D for site health and safety management. Journal of Engineering, Design and Technology, 18(2), pp. 414-430. ISSN 1726-0531
Swei, O (2018) Long-run construction cost trends: Baumol's cost disease and a disaggregate look at building material price dynamics. Journal of Construction Engineering and Management, 144(7): 04018058, ISSN 0733-9364
Sweis, R; Moarefi, A; Hoseini-Amiri, S M and Moarefi, S (2019) Delay factors of the schedule of strategic industrial projects. International Journal of Building Pathology and Adaptation, 37(1), pp. 69-86. ISSN 23984708
Swenarton, M (2009) Research shortcomings in housing. Building Research & Information, 37(1), pp. 101-105. ISSN 0961-3218
Swiggum, K E; Anderson, S D and Russell, J S (1994) Case study of burlington cable-stayed bridge. Journal of Construction Engineering and Management, 120(3), pp. 649-666. ISSN 0733-9364
Syal, M G; Grobler, F; Willenbrock, J H and Parfitt, M K (1992) Construction project planning process model for small-medium builders. Journal of Construction Engineering and Management, 118(4), pp. 651-666. ISSN 0733-9364
Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Tafazzoli, M (2017) Dynamic risk analysis of construction delays using fuzzy-failure mode effects analysis. PhD thesis, University of Nevada, Las Vegas, USA.
Tafese, E. M. and Mengistu, D. G. (2026) Labor productivity management practice in construction companies. International Journal of Construction Management, 26(8), pp. 1527-1542. ISSN 1562-3599
Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation. PhD thesis, University of Alberta, Canada.
Taghaddos, H; Abourizk, S; Mohamed, Y and Hermann, U (2012) Simulation-based auction protocol for resource scheduling problems. Journal of Construction Engineering and Management, 138(1), pp. 31-42. ISSN 0733-9364
Taghaddos, H; Heydari, M H and Asgari, A H (2021) A hybrid simulation approach for site layout planning in construction projects. Construction Innovation, 21(3), pp. 417-440. ISSN 1471-4175
Taghaddos, M; Pereira, E; Osorio-Sandoval, C; Hermann, U and Abourizk, S (2023) A data-driven approach for deploying safety policies for schedule planning in industrial construction projects: A case study. Journal of Construction Engineering and Management, 149(12): 05023013, ISSN 0733-9364
Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.
Tahir, H A (2015) A project control framework for the Libyan construction industry. PhD thesis, Sheffield Hallam University, UK.
Tai, H W; Chen, J H; Cheng, J Y; Wei, H H; Hsu, S C and Liu, H C (2021) Determining worker training time for precast component production in construction: Empirical study in Taiwan. Journal of Construction Engineering and Management, 147(1): 0001964, ISSN 0733-9364
Takim, R (2005) A framework for successful construction project performance. PhD thesis, Glasgow Caledonian University, UK.
Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Takim, R; Akintoye, A and Kelly, J (2004) Analysis of measures of construction project success in Malaysia. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Talabi, B O (2016) Achieving safer behaviours of frontline construction workers: The role of supervisors. PhD thesis, Loughborough University, UK.
Talaq, J (2004) Antecedents and consequences of motivation: an examination of motivation as mediator to human and organisational performance. PhD thesis, University of Wolverhampton, UK.
Talbot, B (2021) A novel data-driven tool to improve construction schedule accuracy. DProf thesis, Anglia Ruskin University, UK.
Talley, K G and Torres, A S (2018) Measuring the impact of using daily objectives to provide rapid feedback in construction courses. International Journal of Construction Education and Research, 14(2), pp. 95-117. ISSN 1557-8771
Tallgren, M V (2018) Developing a collaborative planning tool for construction-a building information model-enhanced planning and scheduling tool for production. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Tam, V W Y; Fung, I W H; Jorge Evangelista, A C J and Wong, S W L (2025) Assistant robotic machine for Hong Kong construction industry. International Journal of Construction Management, 25(14), pp. 1749-1754. ISSN 1562-3599
Tam, C M and Fung, I W H (1998) Effectiveness of safety management strategies on safety performance in Hong Kong. Construction Management and Economics, 16(1), pp. 49-55. ISSN 01446193
Tam, C M; Fung, I W H and Chan, A P C (2001) Study of attitude changes in people after the implementation of a new safety management system: The supervision plan. Construction Management and Economics, 19(4), pp. 393-403. ISSN 01446193
Tam, C M and Tong, T K L (2011) Conflict analysis study for public engagement programme in infrastructure planning. Built Environment Project and Asset Management, 1(1), pp. 45-60. ISSN 2044-124X
Tam, C M; Tong, T K L and Chan, K K (2006) Rough set theory for distilling construction safety measures. Construction Management and Economics, 24(11), pp. 1199-1206. ISSN 1466433X
Tam, T H; Abdul Rahman, M Z; Harun, S; Shahid, S; Try, S; Jamal, M H; Ismail, Z; Razak, K A; Ghani, M K and Abdul Wahab, Y F (2025) Flood hazard assessment using design rainfall under climate change scenarios in the Kelantan River Basin, Malaysia. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 1-19. ISSN 1759-5908
Tam, V W Y; Kim, K and Brohier, A (2021) Life-cycle analysis by using the alternative sustainable water innovations in residential dwellings. International Journal of Construction Management, 21(11), pp. 1143-1155. ISSN 1562-3599
Tam, V W Y and Shen, L Y (2010) On applications of an optimal price-time bidding model in Hong Kong foundation projects. Construction Innovation, 10(1), pp. 14-24. ISSN 1471-4175
Tan, L; Zhang, Y; Chen, Y and Zhu, T (2023) A multiple-objective decision-support model for lighting maintenance routing considering carbon dioxide emissions and balanced workload. Journal of Construction Engineering and Management, 149(8): 04023063, ISSN 0733-9364
Taneja, S; Akinci, B; Garrett, J H; Soibelman, L; Ergen, E; Pradhan, A; Tang, P; Berges, M; Atasoy, G; Liu, X; Shahandashti, S M and Anil, E B (2011) Sensing and field data capture for construction and facility operations. Journal of Construction Engineering and Management, 137, pp. 870-881. ISSN 0733-9364
Tang, G; Zhao, Z; Cao, L; Qi, Y; Yu, X and Liu, W (2023) A simulation optimization approach to optimize dredger fleet schedule plan for dredging works in existing ports. Journal of Construction Engineering and Management, 149(2): 4022165, ISSN 0733-9364
Tang, L; Chen, C; Li, H and Mak, D Y Y (2022) Developing a BIM GIS-integrated method for urban underground piping management in China: A case study. Journal of Construction Engineering and Management, 148(9): 05022004, ISSN 0733-9364
Tang, P (2013) Assessing decision making strategies in construction management by using a schedule-based simulation framework. PhD thesis, Michigan Technological University, USA.
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Tang, S L; Ying, K C; Anson, M and Lu, M (2005) Rmcsim: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(1), pp. 15-31. ISSN 01446193
Tang, Y; Liu, R and Sun, Q (2014) Two-stage scheduling model for resource leveling of linear projects. Journal of Construction Engineering and Management, 140(7): 04014022, ISSN 0733-9364
Tangtinthai, N (2016) Extraction, use and disposal of construction materials in Great Britain and Thailand. PhD thesis, University of Newcastle upon Tyne, UK.
Tanguy, A; Breton, C; Blanchet, P and Amor, B (2020) Characterising the development trends driving sustainable neighborhoods. Buildings & Cities, 1(1), pp. 164-181. ISSN 2632-6655
Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531
Tanratanawong, S (2001) A neural network model to forecast construction output in the United Kingdom. PhD thesis, University of Newcastle upon Tyne, UK.
Tanratanawong, S and Scott, S (2000) A neural network model to forecast national construction output. Journal of Financial Management of Property and Construction, 5(1-2), pp. 65-77. ISSN 1366-4387
Tao, S; Yu, J; Zhu, J; Chen, S and Li, X (2026) Precast component production scheduling considering outsourcing and multiskilled resources. Journal of Construction Engineering and Management, 152(5): 04026040, ISSN 0733-9364
Tao, X (2023) Distributed common data environment for secure BIM-based collaborative design using blockchain technology. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Tao, Y; Hu, H; Xu, F and Zhang, Z (2023) Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory. Journal of Construction Engineering and Management, 149(6): 04023034, ISSN 0733-9364
Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364
Tao, Y; Hu, H; Xu, F and Zhang, Z (2025) Ergonomic risk mitigation through workforce planning for construction projects. Journal of Construction Engineering and Management, 151(4): 04025012, ISSN 0733-9364
Taofeeq, M D; Adeleke, A Q and Lee, C K (2020) Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies. Journal of Engineering, Design and Technology, 18(6), pp. 1543-1569. ISSN 1726-0531
Tapia, Ricardo M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. PhD thesis, Iowa State University, USA.
Tapper, H (1997) Welfare assessment of public investment in a CGE model. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.
Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema. DTech thesis, KTH Royal Institute of Technology, Sweden.
Tasantab, J C; Gajendran, T; Owi, T and Raju, E (2023) Simulation-based learning in tertiary-level disaster risk management education: A class-room experiment. International Journal of Disaster Resilience in the Built Environment, 14(1), pp. 21-39. ISSN 1759-5916
Tatangelo, Matteo (2025) Life-cycle management of new and existing construction based on a time-dependent reliability approach: Methodology, normative developments and applications on existing bridges. PhD thesis, Università degli Studi di Roma La Sapienza, Italy.
Tatari, A (2023) Simulating cost risks for prefabricated construction in developing countries using Bayesian networks. Journal of Construction Engineering and Management, 149(6): 04023037, ISSN 0733-9364
Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364
Tatum, M C and Terrell, F (2012) Hurricane reconstruction in the United States Gulf Coast. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 199-219. ISSN 1759-5916
Tavakolan, M (2011) Development of construction projects scheduling with evolutionary algorithms. PhD thesis, Columbia University, USA.
Tavakolan, M; Chokan, F and Dadashi Haji, M (2024) Simultaneous project portfolio selection and scheduling from contractor perspective. International Journal of Construction Management, 24(3), pp. 298-313. ISSN 1562-3599
Tavakolan, M and Etemadinia, H (2017) Fuzzy weighted interpretive structural modeling: Improved method for identification of risk interactions in construction projects. Journal of Construction Engineering and Management, 143(11): 04017084, ISSN 0733-9364
Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599
Tavakoli, A (1983) Productivity analysis of heavy construction operations. PhD thesis, Georgia Institute of Technology, USA.
Tavakoli, A (1985) Productivity analysis of construction operations. Journal of Construction Engineering and Management, 111(1), pp. 31-39. ISSN 0733-9364
Tavassolirizi, M; Sarvari, H; Chan, D W M and Olawumi, T O (2022) Factors affecting delays in rail transportation projects using analytic network process: The case of Iran. International Journal of Construction Management, 22(14), pp. 2712-2723. ISSN 1562-3599
Tayebi, A; Abbasianjahromi, H and Aghakarimi, M (2025) Using a hybrid method to assess the consequence of hazards on the project success factors. Engineering, Construction and Architectural Management, 32(12), pp. 8273-8303. ISSN 0969-9988
Tayeh, B A; Hallaq, K A; Zahoor, H and Al Faqawi, A H (2019) Techniques and benefits of implementing the last planner system in the Gaza Strip construction industry. Engineering, Construction and Architectural Management, 26(7), pp. 1424-1436. ISSN 0969-9988
Taylor, D D J (2018) Tools for managing intermittent water supplies. PhD thesis, Massachusetts Institute of Technology, USA.
Taylor, J M (1981) Development and evaluation of a network scheduling procedure based on utility theory. PhD thesis, Texas A&M University, USA.
Taylor, S (2015) Sourcing of public sector building surveying and engineering professional services : A framework for progression. PhD thesis, University of Salford, UK.
Taylor, T R B; Ford, D N and Reinschmidt, K F (2012) Impact of public policy and societal risk perception on US civilian nuclear power plant construction. Journal of Construction Engineering and Management, 138(8), pp. 972-981. ISSN 0733-9364
Taylor, T R B; Uddin, M; Goodrum, P M; McCoy, A and Shan, Y (2012) Change orders and lessons learned: Knowledge from statistical analyses of engineering change orders on Kentucky highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1360-1369. ISSN 0733-9364
Teixeira, J M (1993) Contractors management functions: an integrated approach for planning, estimating and control. PhD thesis, Loughborough University, UK.
Teizer, J (2016) Right-time vs real-time pro-active construction safety and health system architecture. Construction Innovation, 16(3), pp. 253-280. ISSN 1471-4175
Teizer, J; Caldas, C H and Haas, C T (2007) Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources. Journal of Construction Engineering and Management, 133(11), pp. 880-888. ISSN 0733-9364
Tembo-Silungwe, C K and Khatleli, N (2022) Development of risk misallocation causal networks using interpretive judgement in the construction industry. International Journal of Construction Management, 22(10), pp. 1935-1949. ISSN 1562-3599
Tenah, K A (1979) Construction management information control systems (CMICS). PhD thesis, Texas A&M University, USA.
Tengan, C; Aigbavboa, C O; Guribie, F and Annor-Asubonteng, J (2019) Analysis of the outcome features of effective monitoring and evaluation in construction project delivery. Journal of Engineering, Design and Technology, 17(6), pp. 1192-1201. ISSN 1726-0531
Tennant, S (2007) Site management teams and project performance in the UK construction industry. PhD thesis, University of Strathclyde, UK.
Tennant, S and Langford, D (2005) Construction management teams & project performance: A diagnostic toolkit. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Tennant, S; McCarney, M and Tong, M K L (2012) Re-engineering the construction supply chain: Transferring on-site activity off-site. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Teo, A L E; Ofori, G; Tjandra, I K and Kim, H (2016) Design for safety: Theoretical framework of the safety aspect of BIM system to determine the safety index. Construction Economics and Building, 16(4), pp. 1-18. ISSN 2204-9029
Teo, R A (2006) Continuous improvement to the construction industry: Enhancing quality through learning. PhD thesis, Heriot-Watt University, UK.
Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364
Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Thabet, W Y and Beliveau, Y J (1994) HVLS: Horizontal and vertical logic scheduling for multistory projects. Journal of Construction Engineering and Management, 120(4), pp. 875-892. ISSN 0733-9364
Thabet, W Y and Beliveau, Y J (1994) Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management, 120(1), pp. 96-116. ISSN 0733-9364
Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.
Thaesler-Garibaldi, M P (2005) A methodology to develop an integrated engineering system to estimate quantities for bridge repairs at the pre-design stage. PhD thesis, Georgia Institute of Technology, USA.
Thajudeen, S; Elgh, F and Lennartsson, M (2022) A framework supporting mixed production strategies in platform development: A case study in post and beam building system. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Thajudeen, S; Lennartsson, M and Elgh, F (2019) Challenges and critical success factors for the design phase in Swedish industrialised house building. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Thal Jr, A E; Cook, J J and White Iii, E D (2010) Estimation of cost contingency for Air Force construction projects. Journal of Construction Engineering and Management, 136(11), pp. 1181-1188. ISSN 0733-9364
Thanaraj, D P; Anand, N and Arulraj, P (2019) Experimental investigation of mechanical properties and physical characteristics of concrete under standard fire exposure. Journal of Engineering, Design and Technology, 17(5), pp. 878-903. ISSN 1726-0531
Tharachai, T (2004) Multiple project resource scheduling for construction. PhD thesis, University of Michigan, USA.
Theaker, I G and Cole, R J (2001) The role of local governments in fostering 'green' buildings: A case study. Building Research & Information, 29(5), pp. 394-408. ISSN 0961-3218
Thiele, Brett James (2024) A financial decision support tool for improved project and portfolio profit performance in project-based organisations. PhD thesis, University of New South Wales, Australia.
Thiengburanathum, P (2003) Design of construction production systems: Representation, taxonomy, and design framework. PhD thesis, University of Colorado at Boulder, USA.
Thomas, A V; Kalidindi, S N and Ananthanarayanan, K (2003) Risk perception analysis of BOT road project participants in India. Construction Management and Economics, 21(4), pp. 393-407. ISSN 01446193
Thomas, H R (2000) Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4), pp. 261-267. ISSN 0733-9364
Thomas, H R and Bluedorn, A C (1986) Case study of organizational changes. Journal of Construction Engineering and Management, 112(3), pp. 358-369. ISSN 0733-9364
Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364
Thomas, H R; Horman, M J and De Souza, U E L (2004) Symbiotic crew relationships and labor flow. Journal of Construction Engineering and Management, 130(6), pp. 908-917. ISSN 0733-9364
Thomas, S R; Lee, S H; Spencer, J D; Tucker, R L and Chapman, R E (2004) Impacts of design/information technology on project outcomes. Journal of Construction Engineering and Management, 130(4), pp. 586-597. ISSN 0733-9364
Thompson, D.; Chileshe, N.; Coggins, J. and Stevels, A. (2025) COVID-19 challenges on construction-related SMEs and response strategies: A scoping review. International Journal of Construction Management, 25(14), pp. 1649-1659. ISSN 1562-3599
Thompson Jr., R C (2012) Risk measurement, allocation, and pricing in network schedule systems. PhD thesis, Catholic University of America, USA.
Thorpe, D and Karan, E (2008) Method for calculating schedule delay considering weather conditions. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Thunberg, M (2016) Developing a framework for supply chain planning in construction. PhD thesis, Linköping University, Sweden.
Thunberg, M; Fredriksson, A; Danielsson, J; Hyll, H; Sandberg, E and Westin, A (2017) Planning in construction: How are the different planning processes linked? In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Tidakbi, Emmanuel Tinakpa (2002) Risk management in the public sector: The case of the National Health Service, United Kingdom. PhD thesis, University College London, UK.
Tilley, M (2016) What elements are required to achieve sustainable business change using health and safety as a lens? DProf thesis, Middlesex University, UK.
Tillson, A A; Oreszczyn, T and Palmer, J (2013) Assessing impacts of summertime overheating: Some adaptation strategies. Building Research & Information, 41(6), pp. 652-661. ISSN 0961-3218
Tissaveerasinghe, S P; Chathuranga, N and Siriwardana, C (2025) Compressed stabilised earth blocks as a sustainable building material: Investigation of customer purchase intentions. Built Environment Project and Asset Management, 15(4), pp. 808-826. ISSN 2044-124X
Titirla, M and Aretoulis, G (2019) Neural network models for actual duration of Greek highway projects. Journal of Engineering, Design and Technology, 17(6), pp. 1323-1339. ISSN 1726-0531
Tiwari, A; Singh, S; Routroy, S; Gopinath, A and Sahu, P K (2025) Analysing critical risk factors of Indian road construction projects: a fuzzy DEMATEL approach. International Journal of Construction Management, 25(4), pp. 469-480. ISSN 1562-3599
Todd, J A; Pyke, C and Tufts, R (2013) Implications of trends in LEED usage: Rating system design and market transformation. Building Research & Information, 41(4), pp. 384-400. ISSN 0961-3218
Tokdemir, O B (2003) ALISS: Advanced linear scheduling system. PhD thesis, Illinois Institute of Technology, USA.
Tokdemir, O B; Arditi, D and Balcik, C (2006) ALISS: Advanced linear scheduling system. Construction Management and Economics, 24(12), pp. 1253-1267. ISSN 1466433X
Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364
Tokede, O; Ahiaga-Dagbui, D and Morrison, J (2022) Attenuating disruptions in knowledge flows in construction projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.
Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea. DEng thesis, George Washington University, USA.
Toma, H. M.; Abdelazim, A. N. and Ibrahim, A. H. (2026) Assessment of estimation performance for activities' cost and time in construction projects using statistical process control. Engineering, Construction and Architectural Management, 33(4), pp. 2669-2695. ISSN 0969-9988
Tomar, A and Bansal, V K (2022) Generation, visualization, and evaluation schedule of repetitive construction projects using GIS. International Journal of Construction Management, 22(6), pp. 1104-1119. ISSN 1562-3599
Tombesi, P; Dave, B; Gardiner, B and Scriver, P (2007) Rules of engagement: Testing the attributes of distant outsourcing marriages. Architectural Engineering and Design Management, 3(1), pp. 49-64. ISSN 1745-2007
Tomczak, M and Jaśkowski, P (2020) New approach to improve general contractor crew's work continuity in repetitive construction projects. Journal of Construction Engineering and Management, 146(5): 1824, ISSN 0733-9364
Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364
Tommelein, I D (2022) Work density method for takt planning of construction processes with nonrepetitive work. Journal of Construction Engineering and Management, 148(12): 04022134, ISSN 0733-9364
Tommelein, I D; Carr, R I and Odeh, A M (1994) Assembly of simulation networks using designs, plans, and methods. Journal of Construction Engineering and Management, 120(4), pp. 796-815. ISSN 0733-9364
Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364
Tommelein, I D and Zouein, P P (1993) Interactive dynamic layout planning. Journal of Construction Engineering and Management, 119(2), pp. 266-287. ISSN 0733-9364
Tonetto, M S; Formoso, C T; Saurin, T A; Bonesi De Luca, F; Lora, F P and Lantelme, E (2024) Resilient performance on construction projects in the post-pandemic era: An organizational perspective. Engineering, Construction and Architectural Management, 31(12), pp. 5007-5028. ISSN 0969-9988
Tong, K; Mills, G and Çidik, M S (2023) Value of modularisation in healthcare buildings: An exploration of the nucleus programme. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Toor, S U R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), pp. 395-408. ISSN 1466433X
Tork, A (2013) A real-time crane service scheduling decision support system (CSS-DSS) for construction tower cranes. PhD thesis, University of Central Florida, USA.
Torres, A (2023) Using large peer-teaching groups to learn construction management software packages. International Journal of Construction Education and Research, 19(4), pp. 426-442. ISSN 1557-8771
Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Torrington, J (2007) Evaluating quality of life in residential care buildings. Building Research & Information, 35(5), pp. 514-528. ISSN 0961-3218
Touran, A (1981) Construction operations data acquisition and processing via time-lapse photography interfaced to a minicomputer. PhD thesis, Stanford University, USA.
Touran, A (1986) Computer packages for construction data acquisition and processing. Construction Management and Economics, 4(3), pp. 233-243. ISSN 01446193
Touran, A (1997) Probabilistic model for tunneling project using Markov chain. Journal of Construction Engineering and Management, 123(4), pp. 444-449. ISSN 0733-9364
Touran, A (2010) Probabilistic approach for budgeting in portfolio of projects. Journal of Construction Engineering and Management, 136(3), pp. 361-366. ISSN 0733-9364
Touran, A and Asai, T (1987) Simulation of tunneling operations. Journal of Construction Engineering and Management, 113(4), pp. 554-568. ISSN 0733-9364
Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364
Towill, D R (2003) Construction and the time compression paradigm. Construction Management and Economics, 21(6), pp. 581-591. ISSN 01446193
Towles, C (2017) Maximizing economic returns for large, publicly funded road infrastructure investments through improved economic, engineering and construction information management. DEng thesis, Ecole de Technologie Superieure, Canada.
Toǧan, V; Sulub, A S; Eirgash, M A and Mostofi, F (2026) Project scheduling to minimize the time and cost in large-scale construction projects with repulsion-based improved arithmetic optimization. Journal of Construction Engineering and Management, 152(3): 04025277, ISSN 0733-9364
Tran, D H (2020) Optimizing time-cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(9), pp. 2287-2313. ISSN 0969-9988
Tran, D H and Long, L D (2018) Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Engineering, Construction and Architectural Management, 25(5), pp. 623-638. ISSN 0969-9988
Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364
Trangkanont, S and Charoenngam, C (2014) Critical failure factors of public-private partnership low-cost housing program in Thailand. Engineering, Construction and Architectural Management, 21(4), pp. 421-443. ISSN 0969-9988
Treacy, D; Spillane, J P and Tansey, P (2016) Construction disputes in small to medium enterprise's in Ireland during recession: Identification of critical factors. International Journal of Law in the Built Environment, 8(1), pp. 21-41. ISSN 1756-1450
Triana-Granados, K V; Bernard, I R; Merlin, A; Lucko, G and Ballesteros-Pérez, P (2024) Graphical delay tracking for linear and repetitive schedules. Journal of Construction Engineering and Management, 150(8): 04024090, ISSN 0733-9364
Trigunarsyah, B (2017) Organizational culture influence on client involvement. Engineering, Construction and Architectural Management, 24(6), pp. 1155-1169. ISSN 0969-9988
Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.
Trill, J E (2003) The application of occupational performance standards in the construction industry: 'Factors influencing their use'. PhD thesis, University of Sussex, UK.
Trinder, L; Browne, J and Brocklebank, K (2018) A client's perspective of design for manufacture and assembly in the UK water industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 141-151. ISSN 17514304
Trushell, I and Morrison, S (2015) Ownership of materials: A Scottish/English dichotomy. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Tsai, D M and Chiu, H N (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14(4), pp. 325-340. ISSN 01446193
Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Tseng, C L; Zhao, T and Fu, C C (2009) Contingency estimation using a real options approach. Construction Management and Economics, 27(11), pp. 1073-1087. ISSN 1466433X
Tsitsirigos, C; Begg, D and Fox, D (1999) Attitudes to management and their effect on progress. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Tuan Son, N; Sherif, M and Mostafa, S (2021) Project stakeholder's engagement and performance: A comparison between complex and non-complex projects using SEM. Built Environment Project and Asset Management, 11(5), pp. 804-818. ISSN 2044-124X
Tucker, M M M R A N N M (2012) Optimising the role of facilities management in the development process: The development of FM-DP integration framework for sustainable development. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Tucker, R and Rollo, J (2006) Teaching and learning in collaborative group design projects. Architectural Engineering and Design Management, 2(1-2), pp. 19-30. ISSN 1745-2007
Tuffaha, F M; Assaf, S; Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), pp. 195-213. ISSN 2044-124X
Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects. PhD thesis, University of California, Berkeley, USA.
Tunefalk, M; Legner, M and Leijonhufvud, G (2020) Long-term effects of additional insulation of building façades in Sweden: Towards a holistic approach. International Journal of Building Pathology and Adaptation, 38(2), pp. 374-385. ISSN 23984708
Tunji-Olayeni, P F; Kajimo–Shakantu, K; Ayodele, T O and Philips, B I (2023) Students' perception of sustainable construction: Accelerating progress towards construction education for sustainable development. International Journal of Construction Management, 23(2), pp. 276-285. ISSN 1562-3599
Tunji-Olayeni, P F; Mosaku, T O; Fagbenle, O I and Amusan, L M (2016) Project management competencies of indigenous contractors in Nigeria. African Journal of Built Environment Research, 1(1), pp. 49-58. ISSN 2414-0236
Turcu, C (2017) Unequal spatial distribution of retrofits in bucharest's apartment buildings. Building Research & Information, 45(8), pp. 892-909. ISSN 0961-3218
Turkan, Y; Bosché, F; Haas, C T and Haas, R (2013) Toward automated earned value tracking using 3D imaging tools. Journal of Construction Engineering and Management, 139(4), pp. 423-433. ISSN 0733-9364
Turkoglu, H; Arditi, D and Polat, G (2023) Mathematical multiobjective optimization model for trade-offs in small-scale construction projects. Journal of Construction Engineering and Management, 149(7): 04023056, ISSN 0733-9364
Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364
Turkoglu, H; Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(4), pp. 619-628. ISSN 1562-3599
Turkoglu, H; Arditi, D and Polat, G (2025) Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects. Construction Management and Economics, 43(9), pp. 704-722. ISSN 0144-6193
Turner, T J A (2010) The practice of financial project management in the consulting engineering industry. PhD thesis, University of Phoenix, USA.
Tutesigensi, A and Parcell, K (2007) Benefits of mobile telephones for construction contractors in the United Kingdom. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Tutesigensi, A and Phung, B N (2011) Vietnamese construction workers' attitude to health and safety. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 41-47. ISSN 17514312
Tutesigensi, A and Pleim, V (2008) Why small and medium construction enterprises do not employ six sigma. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Twinn, C (2013) Professionalism, sustainability and the public interest: What next? Building Research & Information, 41(1), pp. 123-128. ISSN 0961-3218
Twum, B A; Kabiri, S and Tutt, D (2023) Managing onsite production pressure and its impact on safety performance in construction: An activity theory analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Türkakın, O H; Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), pp. 2893-2909. ISSN 0969-9988
Udeaja, C and Aziz, Z (2015) A case study of fostering multidisciplinary in built environment using BIM. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Uduwage Don, N L S; Panuwatwanich, K and Waidyasekara, K G A S (2025) Multicriteria selection practices in public tender evaluation process: The case of Sri Lanka. Built Environment Project and Asset Management, 15(3), pp. 733-751. ISSN 2044-124X
Ugulu, R; Arewa, A and Stephen, A (2019) Relationship between labour productivity and curved wall construction in high-rise building projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Ugwuoke, A A (2018) Innovation persistence during economic crisis by Nigeria's construction contracting firms: an investigation of the critical success factors. PhD thesis, University of Salford, UK.
Uher, T E and Ritchie, J A N (1998) Promoting the health of construction workers. Engineering, Construction and Architectural Management, 5(3), pp. 304-311. ISSN 0969-9988
Umar, A A; Zawawi, N A W A and Abdul-Aziz, A R (2019) Exploratory factor analysis of skills requirement for PPP contract governance. Built Environment Project and Asset Management, 9(2), pp. 277-290. ISSN 2044-124X
Umar, M; Ofem, M I; Anwar, A S and Salisu, A G (2021) Modelling of mechanical properties of Pa6 based reinforced graphite and graphite nano platelets composites using different aspect ratio. Journal of Engineering, Design and Technology, 19(4), pp. 809-827. ISSN 1726-0531
Umuhoza, E; Bitamba, B F and An, S H (2023) Causes and preventive strategies of scope creep for building construction projects in democratic republic of Congo and Rwanda. International Journal of Construction Management, 23(7), pp. 1264-1275. ISSN 1562-3599
Underwood, J (1995) Integrating design and construction to improve constructability through an effective usage of IT. PhD thesis, University of Salford, UK.
Ungureanu, L C; Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules' quality. Engineering, Construction and Architectural Management, 26(2), pp. 224-244. ISSN 0969-9988
Upadhyay, A K and Jain, K (2016) Modularity in nuclear power plants: A review. Journal of Engineering, Design and Technology, 14(3), pp. 526-542.
Upstill-Goddard, J; Glass, J; Dainty, A and Nicholson, I (2016) Implementing sustainability in small and medium-sized construction firms: The role of absorptive capacity. Engineering, Construction and Architectural Management, 23(4), pp. 407-427. ISSN 0969-9988
Urme, S A; Radia, M A; Alam, R; Chowdhury, M U; Hasan, S; Ahmed, S; Sara, H H; Islam, M S; Jerin, D T; Hema, P S; Rahman, M; Islam, A K M M; Hasan, M T and Quayyum, Z (2021) Dhaka landfill waste practices: Addressing urban pollution and health hazards. Buildings & Cities, 2(1), pp. 700-716. ISSN 2632-6655
Urquhart, S and Whyte, A (2018) Contractor tendering research: Going beyond bid/no-bid and markup models. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 255-262. ISSN 17514304
Utomo, C and Rahmawati, Y (2020) Agreement options for negotiation on material location decision of housing development. Construction Innovation, 20(2), pp. 209-222. ISSN 1471-4175
Uwakweh, B O and Maloney, W F (1991) Conceptual model for manpower planning for the construction industry in developing countries. Construction Management and Economics, 9(5), pp. 451-465. ISSN 01446193
Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.
V Nithyapriyadharshini (2017) A study on the workplace issues faced by women labours in the construction industry in Chennai city. PhD thesis, Mother Teresa Womens University, India.
Vacanas, Y and Danezis, C (2021) An overview of the risk of delay in Cyprus construction industry. International Journal of Construction Management, 21(4), pp. 369-381. ISSN 1562-3599
Vahabi, A; Nasirzadeh, F and Mills, A (2022) Impact of project briefing clarity on construction project performance. International Journal of Construction Management, 22(13), pp. 2504-2516. ISSN 1562-3599
Vahabi, A; Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: A fuzzy hybrid simulation approach. Construction Management and Economics, 40(4), pp. 278-295. ISSN 01446193
Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988
Vahabi, Ali (2018) Investigating the impact of project scope definition on design-build project performance: A system dynamics approach. PhD thesis, Queensland University of Technology, Australia.
Vakola, M (1999) Business process re-engineering and organisational change: Evaluation of implementation strategies. PhD thesis, University of Salford, UK.
Valentin, V (2011) Impact assessment of inter-organizational dynamics on the performance metrics of capital-intensive projects. PhD thesis, Purdue University, USA.
Valero-Silva, N and Jones, A (2011) An evaluation of the customer satisfaction monitoring system in a decent homes programme. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Valikoniene, L (2015) Resource buffers in critical chain project management. PhD thesis, University of Manchester, UK.
Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364
Valkonen, T; Lindberg, A; Alhava, O; Talebi, S; Koskela, L and Seppänen, O (2026) Tolerance management in prefabrication of mechanical, electrical, and plumbing installations. Construction Management and Economics, 44(4), pp. 279-299. ISSN 0144-6193
Van Bohemen, H D (2004) Ecological engineering and civil engineering works. PhD thesis, Delft University of Technology, Netherlands.
Van Buiten, M and Hartmann, A (2015) Asset management perspective on the duration of public-private partnership contracts: Cost-control trade-off? Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Van Der Heijden, J (2015) Voluntary programmes for building retrofits: Opportunities, performance and challenges. Building Research & Information, 43(2), pp. 170-184. ISSN 0961-3218
Van Roy, A F and Firdaus, A (2020) Building information modelling in Indonesia: Knowledge, implementation and barriers. Journal of Construction in Developing Countries, 25(2), pp. 199-217. ISSN 1823-6499
VanVactor, J D (2011) Cognizant healthcare logistics management: Ensuring resilience during crisis. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 245-255. ISSN 1759-5916
Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.
Vanhoucke, M (2006) Work continuity constraints in project scheduling. Journal of Construction Engineering and Management, 132(1), pp. 14-25. ISSN 0733-9364
Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.
Varghese, K (1992) Automated route planning for large vehicles on industrial construction sites. PhD thesis, University of Texas at Austin, USA.
Varghese, K and O'Connor, J T (1995) Routing large vehicles on industrial construction sites. Journal of Construction Engineering and Management, 121(1), pp. 1-12. ISSN 0733-9364
Vatterott, A G (2018) A multi-skilled approach to property maintenance considering temporal, spatial and resource constraints. PhD thesis, University of Missouri - Saint Louis, USA.
Vaux, J S and Kirk, W M (2018) Relationship conflict in construction management: Performance and productivity problem. Journal of Construction Engineering and Management, 144(6): 1478, ISSN 0733-9364
Vaux, James S (2014) Relationship conflict in construction management and how it affects performance and profit. PhD thesis, Washington State University, USA.
Vaz-Serra, P and Mitcheltree, H (2021) Understanding the key master of construction project management graduate competencies required to meet industry needs in Australia. International Journal of Construction Education and Research, 17(3), pp. 222-241. ISSN 1557-8771
Vaziri, K (2006) Program planning under uncertainty. PhD thesis, Cornell University, USA.
Vaziri, K; Carr, P G and Nozick, L K (2007) Project planning for construction under uncertainty with limited resources. Journal of Construction Engineering and Management, 133(4), pp. 268-276. ISSN 0733-9364
Venkatesan, R; Varghese, K and Ananthanarayanan, K (2009) Motivation and demotivation cause factors for engineers in construction organisations. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Venkateswaran, C B and Murugasan, R (2017) Time delay and cost overrun of road over bridge construction projects in India. Journal of Construction in Developing Countries, 22(S1), pp. 79-96. ISSN 1823-6499
Verburg, Willem Hendrik (2021) The development of a design-for-assembly method for construction and infrastructure projects. PhD thesis, University of Twente, Netherlands.
Vermeer, D M M (2019) Collective learning in strategic public private partnership procurement systems for social infrastructure. PhD thesis, University of London, University College London, UK.
Vermeer, Daniel Marinus Maria (2019) Collective learning in strategic public private partnership (PPP) procurement systems for social infrastructure. PhD thesis, University College London, UK.
Vernikos, V K (2016) Realising offsite construction in the civil engineering and infrastructure sector. PhD thesis, Loughborough University, UK.
Vernikos, V K; Goodier, C I; Gibb, A G F; Robery, P C and Broyd, T W (2011) Offsite innovation in UK infrastructure: The role of the approvals process in box jacking projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Vick, S (2018) Automated spatial progress monitoring for asphalt road construction projects. PhD thesis, University of Cambridge, UK.
Vidogah, W (1997) Claims on construction contracts: a new management framework. PhD thesis, University of Wolverhampton, UK.
Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988
Viklund Tallgren, M; Roupe, M and Johansson, M (2015) An empowered collaborative planning method in a Swedish construction company: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Viles, E; Rudeli, N C and Santilli, A (2020) Causes of delay in construction projects: A quantitative analysis. Engineering, Construction and Architectural Management, 27(4), pp. 917-935. ISSN 0969-9988
Villa, J and Ariaratnam, S T (2013) Project management functions for the light industrial sector in Mexico. International Journal of Construction Education and Research, 9(3), pp. 163-182. ISSN 1557-8771
Vilventhan, A and Kalidindi, S N (2016) Interrelationships of factors causing delays in the relocation of utilities: A cognitive mapping approach. Engineering, Construction and Architectural Management, 23(3), pp. 349-368. ISSN 0969-9988
Vilventhan, A and Kalidindi, S N (2018) Utility relocation management in highway projects. Built Environment Project and Asset Management, 8(2), pp. 171-182. ISSN 2044-124X
Vinci, F (2022) Project-based networks in the delivery of infrastructure projects and programmes. PhD thesis, University College London, UK.
Vine, R (2018) The intelligent client: learning to govern through numbers at Heathrow. PhD thesis, University of Sussex, UK.
Vines, M P and Egbu, C O (2004) Readiness assessment process protocol for e-business initiatives in construction organisations. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Visscher, H; Suddle, S and Meijer, F (2008) Quantitative risk analysis as a supporting tool for safety protocols at multi-functional urban locations. Construction Innovation, 8(4), pp. 269-279. ISSN 1471-4175
Viswanathan, S K; Tripathi, K K and Jha, K N (2020) Influence of risk mitigation measures on international construction project success criteria: A survey of Indian experiences. Construction Management and Economics, 38(3), pp. 207-222. ISSN 01446193
Vo, H M; Yang, J B and Rangasamy, V (2025) A comprehensive review of delay analysis techniques for solving concurrent delays. Engineering, Construction and Architectural Management, 32(5), pp. 3495-3521. ISSN 0969-9988
Volker, L; Eriksson, P E; Kadefors, A and Larsson, J (2018) A case-based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Volker, L; Scharpff, J C D; de Weerdt, M M and Herder, P M (2012) Designing a dynamic network-based approach for asset management activities. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Voordijk, H and Adriaanse, A (2016) Engaged scholarship in construction management research: The adoption of information and communications technology in construction projects. Construction Management and Economics, 34(7-8), pp. 536-551. ISSN 01446193
Voordijk, H and Vrijhoef, R (2003) Improving supply chain management in construction: What can be learned from the aerospace industry? In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Votto, R; Lee Ho, L and Berssaneti, F (2020) Applying and assessing performance of earned duration management control charts for EPC project duration monitoring. Journal of Construction Engineering and Management, 146(3): 04020001, ISSN 0733-9364
Votto, R; Lee Ho, L and Berssaneti, F (2021) Earned duration management control charts: Role of control limit width definition for construction project duration monitoring. Journal of Construction Engineering and Management, 147(9): 04021108, ISSN 0733-9364
Vu, H A; Cu, V H; Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(6), pp. 1018-1039. ISSN 0969-9988
Wachira, N; Root, D; Bowen, P and Olima, W (2008) Changing craft skills in the Kenyan construction sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Wade, F and Visscher, H (2021) Retrofit at scale: Accelerating capabilities for domestic building stocks. Buildings & Cities, 2(1), pp. 800-811. ISSN 2632-6655
Wahab, A (2024) Integrating building information modeling (BIM) and blockchain technology in the pre-construction planning processes. PhD thesis, Mississippi State University, USA.
Walker, A; Greenwood, D and Johansen, E (2010) User engagement and quality in the design of UK schools. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Walker, D H T (1994) An investigation into factors that determine building construction time performance. PhD thesis, Royal Melbourne Institute of Technology, Australia.
Walker, D H T (1995) An investigation into construction time performance. Construction Management and Economics, 13(3), pp. 263-274. ISSN 01446193
Walker, D H T (1995) The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(1), pp. 4-20. ISSN 1358-9180
Walker, D H T (1996) The contribution of the construction management team to good construction time performance: An Australian experience. Journal of Construction Procurement, 2(2), pp. 4-18. ISSN 1358-9180
Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(1), pp. 42-55. ISSN 1358-9180
Walker, D H T (1997) Choosing an appropriate research methodology. Construction Management and Economics, 15(2), pp. 149-159. ISSN 01446193
Walker, D H T (1998) The contribution of the client representative to the creation and maintenance of good project inter-team relationships. Engineering, Construction and Architectural Management, 5(1), pp. 51-57. ISSN 0969-9988
Walker, D H T and Steinfort, P (2013) Using an improved rich pictures approach to improve project situational analysis in complex aid reconstruction development projects. International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 182-198. ISSN 1759-5916
Walker, D H T and Vines, M W (1997) Construction time performance in multi-unit residential construction: Insight into the role of procurement methods. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(3), pp. 278-284. ISSN 0969-9988
Walker, G H; Foscarin-Kosmetatou, S; Marr, S; Gillies, S and Lindsay, P (2024) Critical essay: Sociotechnical construction. Construction Management and Economics, 42(3), pp. 251-265. ISSN 01446193
Walker D.H.T, S Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies. Construction Management and Economics, 20(1), pp. 31-44. ISSN 01446193
Wall, J (2009) The development of technology facilitated learning for continuing professional development of construction managers. PhD thesis, University of Salford, UK.
Wall, J and Ahmed, V (2005) Issues in developing a blended learning initiative to meet continuing professional development needs of construction professionals in Ireland. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wall, J and Ahmed, V (2006) Delivering continuing professional development for construction management using e-learning. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Wall, J and Ahmed, V (2007) Blended lifelong learning delivery: Lessons learned from a pilot study. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Wall, J and Ahmed, V (2008) Lessons learned from a case study in deploying blended learning continuing professional development. Engineering, Construction and Architectural Management, 15(2), pp. 185-202. ISSN 0969-9988
Walsh, K D; Hershauer, J C; Tommelein, I D and Walsh, T A (2004) Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6), pp. 818-826. ISSN 0733-9364
Wambeke, B W (2011) Identifying, prioritizing, and reducing variation of construction related tasks. PhD thesis, North Carolina State University, USA.
Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364
Wambeke, B W; Liu, M and Hsiang, S M (2012) Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks. Journal of Construction Engineering and Management, 138(4), pp. 491-498. ISSN 0733-9364
Wambeke, B W; Liu, M and Hsiang, S M (2012) Using Pajek and centrality analysis to identify a social network of construction trades. Journal of Construction Engineering and Management, 138(10), pp. 1192-1201. ISSN 0733-9364
Wamsler, C and Brink, E (2015) The role of individual adaptive practices for sustainable adaptation. International Journal of Disaster Resilience in the Built Environment, 6(1), pp. 6-29. ISSN 1759-5916
Wamsler, C and Brink, E (2016) The urban domino effect: A conceptualization of cities' interconnectedness of risk. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 80-113. ISSN 1759-5916
Wamuziri, S (2010) Alternative models for procurement of major infrastructure projects in Scotland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Wamuziri, S (2011) Evaluation of workplace drug testing in UK civil engineering construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 147-157. ISSN 17514312
Wamuziri, S and Jiang, M (2008) Role of export credit agencies in PFI/PPP projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 163-169. ISSN 17514312
Wanberg, J; Harper, C; Hallowell, M R and Rajendran, S (2013) Relationship between construction safety and quality performance. Journal of Construction Engineering and Management, 139(10): 04013004, ISSN 0733-9364
Wang, L.; Yuan, J.; Su, S.; Weng, S. and Hu, F. (2026) Vision-based progress compliance and worker health monitoring in concrete pouring and vibration. Journal of Construction Engineering and Management, 152(10): 04026162, ISSN 0733-9364
Wang, Q; Tang, R; Guo, Z and Wu, J (2026) Impacts of policy instrument combinations on the collaborative innovation of generic technology for green building: Tripartite evolutionary game analysis. Journal of Construction Engineering and Management, 152(4): 04026014, ISSN 0733-9364
Wang, S.; Hu, X.; Wei, A.; Yang, W. and Cui, Q. (2026) The non-linear impact of industrial agglomeration on green total factor productivity in construction: Moderating role of construction consulting services. Engineering, Construction and Architectural Management, 33(15), pp. 458-480. ISSN 0969-9988
Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364
Wang, Z.; Hu, X.; Wei, A.; Yang, W. and Dong, Z. (2026) A blockchain-based system for just-in-time in construction supply chains. Built Environment Project and Asset Management, 16(2), pp. 377-395. ISSN 2044-124X
Wang, Z.; Li, J.; Yan, X.; Li, H. and Li, J. (2026) Dynamic collision risk warning in construction sites for nonlinear movements: A visual-spatial fusion multimodal prediction method. Journal of Construction Engineering and Management, 152(10): 04026170, ISSN 0733-9364
Wang, Z; Yan, X; Liu, Q; Ma, X and Li, H (2026) Vision-based collision prevention on construction sites: Integrating trajectory prediction and uncertainty modeling. Journal of Construction Engineering and Management, 152(1): 04025214, ISSN 0733-9364
Wang, C; Li, B; Li, B and Baldwin, A (2017) Case study of "project controlling" on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(6), pp. 862-874. ISSN 0969-9988
Wang, C; Liu, H; Sing, M C P and Wu, J (2024) Pre-construction duration of public-private partnership projects: Evidence from China. Engineering, Construction and Architectural Management, 31(4), pp. 1715-1729. ISSN 0969-9988
Wang, C; Liu, M; Hsiang, S M and Leming, M L (2012) Causes and penalties of variation: Case study of a precast concrete slab production facility. Journal of Construction Engineering and Management, 138(6), pp. 775-785. ISSN 0733-9364
Wang, C H and Huang, Y C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(1), pp. 5-16. ISSN 01446193
Wang, H (2000) A follow-up study of workers with soft tissue injuries using the databases of the Ontario workplace safety and insurance board (WSIB). PhD thesis, University of Toronto, Canada.
Wang, H (2017) Construction project performance improvement through radio frequency identification technology application on a project supply chain. PhD thesis, Purdue University, USA.
Wang, H; Chen, X; Wang, J; Guan, W and Wei, S (2025) Multiobjective trade-off optimization of time, cost, quality, and carbon emission in the building construction stage. Journal of Construction Engineering and Management, 151(4): 04025009, ISSN 0733-9364
Wang, H; Shen, J and Gao, D (2019) Seismic damage of gravity abutment in liquefied ground. Journal of Engineering, Design and Technology, 17(1), pp. 53-76. ISSN 1726-0531
Wang, H; Yang, Q; Liu, Q; Zhao, C and Zhou, W (2024) Automatic planning for cable crane operations in concrete dam construction. Journal of Construction Engineering and Management, 150(12): 04024177, ISSN 0733-9364
Wang, J (2022) BIM and construction dispute management. PhD thesis, University of Manchester, UK.
Wang, J; Han, C and Li, X (2023) Modified streamlined optimization algorithm for time-cost tradeoff problems of complex large-scale construction projects. Journal of Construction Engineering and Management, 149(5): 04023022, ISSN 0733-9364
Wang, J; Han, J; Chen, J; Ding, G; Feng, G; Liu, T and Guo, B (2022) Experimental and numerical study on the dynamic response of a superthick backfill subgrade under high-speed railway loading: A case study of qianjiang-zhangjiajie-changde railway. Journal of Construction Engineering and Management, 148(12): 05022014, ISSN 0733-9364
Wang, J; Huang, W and Chen, Y (2025) Solving stochastic time-cost trade-off problems via modified double-loop procedure with adaptive domain decomposition method. Journal of Construction Engineering and Management, 151(2): 04024199, ISSN 0733-9364
Wang, J; Shou, W; Wang, X and Wu, P (2016) Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction. Construction Management and Economics, 34(12), pp. 859-874. ISSN 01446193
Wang, L; Lee, J; Nimawat, J; Han, K and Gupta, A (2024) Integrated 4D design change management model for construction projects. Journal of Construction Engineering and Management, 150(5): 04024023, ISSN 0733-9364
Wang, P; Fenn, P; Wang, K and Huang, Y (2022) A Bayesian belief network predictive model for construction delay avoidance in the UK. Engineering, Construction and Architectural Management, 29(5), pp. 2011-2026. ISSN 0969-9988
Wang, P; Wang, K; Huang, Y and Fenn, P (2025) Probability, formation, and prediction of large-size construction cost overruns governed by a power-law distribution. Journal of Construction Engineering and Management, 151(6): 04025062, ISSN 0733-9364
Wang, P; Wang, K; Huang, Y; Fenn, P and Stewart, I (2022) Auditing construction cost from an in-process perspective based on a Bayesian predictive model. Journal of Construction Engineering and Management, 148(4): 04022003, ISSN 0733-9364
Wang, Q (2017) Automated geometry quality assessment of precast concrete elements using 3D laser scan data. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Wang, R C and Liang, T F (2004) Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22(10), pp. 1047-1056. ISSN 01446193
Wang, R D; Zayed, T; Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(9): 04024121, ISSN 0733-9364
Wang, S; Tang, J; Zou, Y and Zhou, Q (2020) Research on production process optimization of precast concrete component factory based on value stream mapping. Engineering, Construction and Architectural Management, 27(4), pp. 850-871. ISSN 0969-9988
Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988
Wang, T and Feng, J (2023) Optimal review strategy for concurrent execution of design-construction tasks in DB mode. Journal of Construction Engineering and Management, 149(1): 04022139, ISSN 0733-9364
Wang, T K; Ford, D N; Chong, H Y and Zhang, W (2018) Causes of delays in the construction phase of Chinese building projects. Engineering, Construction and Architectural Management, 25(11), pp. 1534-1551. ISSN 0969-9988
Wang, W (2010) Multivariate stochastic copula-based deterioration models in infrastructure economic risk management. DES thesis, Columbia University, USA.
Wang, W C and Demsetz, L A (2000) Application example for evaluating networks considering correlation. Journal of Construction Engineering and Management, 126(6), pp. 467-474. ISSN 0733-9364
Wang, W C and Demsetz, L A (2000) Model for evaluating networks under correlated uncertainty: netcor. Journal of Construction Engineering and Management, 126(6), pp. 458-466. ISSN 0733-9364
Wang, X; Wang, X and Huang, Y (2019) Chinese construction worker reluctance toward vocational skill training. Journal of Engineering, Design and Technology, 17(1), pp. 155-171. ISSN 1726-0531
Wang, Y; Goodrum, P M; Haas, C; Glover, R and Vazari, S (2010) Analysis of the benefits and costs of construction craft training in the United States based on expert perceptions and industry data. Construction Management and Economics, 28(12), pp. 1269-1285. ISSN 1466433X
Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2009) Analysis of observed skill affinity patterns and motivation for multiskilling among craft workers in the U.S. Industrial construction sector. Journal of Construction Engineering and Management, 135(10), pp. 999-1008. ISSN 0733-9364
Wang, Y and Shao, L (2018) Understanding occupancy and user behaviour through Wi-Fi-based indoor positioning. Building Research & Information, 46(7), pp. 725-737. ISSN 0961-3218
Wang, Y; Zhu, S and Wong, A S T (2014) Cooling time estimation of newly placed hot-mix asphalt pavement in different weather conditions. Journal of Construction Engineering and Management, 140(5): 04014009, ISSN 0733-9364
Wang, Y-P (2021) How level of detail of activity duration data influences look-ahead schedule performance in prefabricated construction. PhD thesis, Stanford University, USA.
Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.
Wang, Z; Hu, H and Gong, J (2018) Modeling worker competence to advance precast production scheduling optimization. Journal of Construction Engineering and Management, 144(11): 04018098, ISSN 0733-9364
Wang, Z; Liu, Y; Hu, H and Dai, L (2021) Hybrid rescheduling optimization model under disruptions in precast production considering real-world environment. Journal of Construction Engineering and Management, 147(4): 04021012, ISSN 0733-9364
Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation, 19(2), pp. 280-294. ISSN 1471-4175
Wang, Zhichen (2025) Framework for automated change propagation from building information models to building energy models. PhD thesis, Carnegie Mellon University, USA.
Wanigarathna, N; Henjewele, C; Jones, K G; Pascale, F and Morga, M (2022) Modelling earthquake damage repair costs: Improving accuracy for preparedness decision making. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Wantanakorn, D (2000) Effects of management errors on construction projects. PhD thesis, University of Nottingham, UK.
Wantanakorn, D; Mawdesley, M J and Askew, W H (1999) Management errors in construction. Engineering, Construction and Architectural Management, 6(2), pp. 112-120. ISSN 0969-9988
Ward, B (2015) Integrated asset management systems for water infrastructure. EngD thesis, University of Exeter, UK.
Ward, S A (2015) Critical success factors for lean construction intervention. PhD thesis, University of Dundee, UK.
Warrner, J (2018) Transitioning from college to career: Skills needed for success for construction professionals. EdD thesis, Ball State University, USA.
Warszawski, A (2003) Parametric analysis of the financing cost in a building project. Construction Management and Economics, 21(5), pp. 447-459. ISSN 01446193
Warszawski, A; Avraham, M and Carmel, D (1984) Utilization of precast concrete elements in building. Journal of Construction Engineering and Management, 110(4), pp. 476-485. ISSN 0733-9364
Waskett, P R (1999) Management of the building design process with the analytical design planning technique. PhD thesis, Loughborough University, UK.
Waters, J and Raidén, A B (2008) Consideration of personal safety in project deployment. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Watts, C J (2002) In-service training for computer-aided design in building surveying. PhD thesis, De Montfort University, UK.
Waugh, L M (1990) A construction planner. PhD thesis, Stanford University, USA.
Waziri, B S (2018) Pareto analysis of critical risk factors of build operate and transfer projects in Nigeria. Journal of Construction Business and Management, 2(1), pp. 33-40. ISSN 2521-0165
Wearne, S H (1969) Organization of large engineering design departments. PhD thesis, University of Manchester, UK.
Weatherhead, M; Main, K and Devitt, R (2001) Leaders share knowledge. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Weber, I and Isatto, E L (2025) Performance metrics for the corrective building maintenance of hospital facilities. Building Research & Information, 53(5), pp. 582-599. ISSN 0961-3218
Weerasekara, D T; Disaratna, V; Withanage, K T and Perera, B A K S (2023) Procurement management in the foreign-funded construction projects implemented in Sri Lanka. International Journal of Construction Management, 23(7), pp. 1118-1130. ISSN 1562-3599
Weiss, A P W (2006) Value for money: defining and measuring 'value' in MoD's acquisition policy of obtaining best value for money. PhD thesis, University College London, UK.
Weiss, T (2021) Energy flexibility and shiftable heating power of building components and technologies. Smart and Sustainable Built Environment, 10(4), pp. 740-758. ISSN 2046-6099
Wells, J (2001) Construction and capital formation in less developed economies: Unravelling the informal sector in an African city. Construction Management and Economics, 19(3), pp. 267-274. ISSN 01446193
Wentzel, L; Wentzel, T and Emuze, F A (2014) The construction SMEs development debate in South Africa: Contributions from fet colleges. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri). DSc thesis, George Washington University, USA.
Werna, E (2006) The construction action programme of the international labour office: A view of on-going implementation and implications for research. Journal of Construction in Developing Countries, 11(1), pp. 53-72. ISSN 1823-6499
Wernsman, M G (2008) The process of designing and constructing an accessible residence hall for people with disabilities on a public university campus. PhD thesis, Colorado State University, USA.
Wesz, J G B; Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(2), pp. 134-152. ISSN 0969-9988
Wetherington, L E (1992) The effect of variations in management techniques on construction productivity. PhD thesis, University of Florida, USA.
Whaley, A; McAdam, B and Crowe, P (2015) The acceleration dilemma: Can English law accommodate constructive acceleration? International Journal of Law in the Built Environment, 7(3), pp. 248-267. ISSN 1756-1450
Whang, S W; Flanagan, R and Kim, K P (2025) An analysis of the optimal research and development investment level of contractor using the panel threshold regression model. International Journal of Construction Management, 25(16), pp. 2007-2019. ISSN 1562-3599
Whang, S W; Park, K S and Kim, S (2019) Critical success factors for implementing integrated construction project delivery. Engineering, Construction and Architectural Management, 26(10), pp. 2432-2446. ISSN 0969-9988
Whelton, M G (2004) The development of purpose in the project definition phase of construction projects: Implications for project management. PhD thesis, University of California, Berkeley, USA.
Whelton, M G and Ballard, G (2002) Decriptive design study: A building facility renewal planning study. Journal of Construction Research, 3(1), pp. 17-33. ISSN 1609-9451
Whelton, M G and Keane, M M (1998) The systematic development of a software environment for building appraisal in the building renovation industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
White, C; Lees, J M and MacAskill, K (2026) Bridging the information gap using targeted digital transformation: Process mapping large-scale concrete activity. Building Research & Information, 54(1), pp. 24-43. ISSN 0961-3218
White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193
White, D and Fortune, J (2012) Using systems thinking to evaluate a major project: The case of the Gateshead Millennium Bridge. Engineering, Construction and Architectural Management, 19(2), pp. 205-228. ISSN 0969-9988
White, T G (1975) Ergonomic analysis of human factors affecting optimum performance of mobile crane drivers. PhD thesis, University of Surrey, UK.
Whiteman, W E and Irwig, H G (1988) Disturbance scheduling technique for managing renovation work. Journal of Construction Engineering and Management, 114(2), pp. 191-213. ISSN 0733-9364
Whyte, J; Davies, A and Sexton, C (2022) Systems integration in infrastructure projects: seven lessons from Crossrail. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(3), pp. 103-109. ISSN 17514304
Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193
Wickramaratne, S; Wirasinghe, S C and Ruwanpura, J (2020) An update of proposed Sri Lanka warning system for East and West Coast tsunamis. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 169-186. ISSN 1759-5916
Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.
Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wiguna, I P A and Scott, S (2006) Relating risk to project performance in Indonesian building contracts. Construction Management and Economics, 24(11), pp. 1125-1135. ISSN 1466433X
Wild, S (1996) Observations on the use of ground waste clay brick as a cement replacement material. Building Research & Information, 24(1), pp. 35-40. ISSN 0961-3218
Willand, N; Moore, T; Horne, R and Robertson, S (2020) Retrofit poverty: Socioeconomic spatial disparities iretrofit subsidies uptake. Buildings & Cities, 1(1), pp. 14-35. ISSN 2632-6655
Willcock, J and Evans, S (2003) Co-development: A case study linking work from the automotive sector with the construction industry. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Williams, J.; Ibrahim, K.; Simpeh, F. and Amoah, C. (2026) Evaluating sensing technology adaptation benefits in construction: A cross-cultural view. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 124-133. ISSN 1751-4304
Williams, A (2019) Developing metadata and methodologies to support assessment of the social value of buildings and communities in future smart cities. EngD thesis, University of Hertfordshire, UK.
Williams, L M (2000) Strategic decision support for project portfolio management in the public sector. PhD thesis, University of California, Los Angeles, USA.
Williams, P and Williams, A (2014) Planning law reform and fast-tracking development in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Williams, R C; Hildreth, J C and Vorster, M C (2009) Highway construction data collection and treatment in preparation for statistical regression analysis. Journal of Construction Engineering and Management, 135(12), pp. 1299-1306. ISSN 0733-9364
Williams, T (1999) Allocation of contingency in activity duration networks. Construction Management and Economics, 17(4), pp. 441-447. ISSN 01446193
Williams, T (2013) The management of renewable energy technologies implementations within a contracting organisation's processes. EngD thesis, Loughborough University, UK.
Williams, T J (2020) Relationships between cost estimates, scheduling and project success in the construction sector. PhD thesis, Walden University, USA.
Williams, T P (1987) Knowledge-based productivity analysis of construction operations. PhD thesis, Georgia Institute of Technology, USA.
Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193
Williams, T P (2007) Application of treemaps to the analysis of competitively bid project cost overruns. Construction Innovation, 7(4), pp. 340-356. ISSN 1471-4175
Williams Jr., G H (2003) An evaluation of public construction contracting methods for the public building sector in Oregon using data envelopment analysis. PhD thesis, Portland State University, USA.
Willmer, G (1988) Development of risk models for engineering construction projects. PhD thesis, University of Manchester, UK.
Wilson, O D and Kenley, R (1987) Estimates given and tenders received: A comparison. Construction Management and Economics, 5(3), pp. 211-226. ISSN 01446193
Winarno, S; Griffith, A and Stephenson, P (2008) Earthquake risk reduction to non-engineered buildings: A study of practice in Indonesia. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Winata, L E and Gultom, Y M L (2024) The effects of governance on performance: The case of public-private partnership (PPP) toll roads in Indonesia. International Journal of Construction Management, 24(13), pp. 1398-1406. ISSN 1562-3599
Winch, G and Carr, B (2001) Benchmarking on-site productivity in France and the UK: A CALIBRE approach. Construction Management and Economics, 19(6), pp. 577-590. ISSN 01446193
Winch, G M and Carr, B (2001) Processes, maps and protocols: Understanding the shape of the construction process. Construction Management and Economics, 19(5), pp. 519-531. ISSN 01446193
Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364
Windapo, A; Matshidze, L and Alade, K (2025) Artisan development in the AEC industry: strategies for attracting, transitioning and retaining workers. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(3), pp. 151-159. ISSN 17514304
Wirahadikusumah, R and Abraham, D M (2003) Application of dynamic programming and simulation for sewer management. Engineering, Construction and Architectural Management, 10(3), pp. 193-208. ISSN 0969-9988
Wirba, E N (1996) An object-oriented knowledge-based systems approach to construction project control. PhD thesis, London South Bank University, UK.
Withrow, J; Dadi, G; Nassereddine, H and Sturgill, R (2024) Asphalt material e-ticketing workflow: Qualitative and quantitative analysis. Journal of Construction Engineering and Management, 150(3): 04023164, ISSN 0733-9364
Withrow, Josh (2024) Impact of augmented documentation workflows on transportation agency asphalt paving operations: A qualitative and quantitative study. PhD thesis, University of Kentucky, USA.
Witteveen, W and Dorée, A (2011) Quick and effective: An innovative procurement scheme for six Dutch highway projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Woksepp, S (2007) Virtual reality in construction tools, methods and processes. PhD thesis, Luleå University of Technology, Sweden.
Woldesenbet, A; Jeong, D H S and Oberlender, G D (2012) Daily work reports-based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), pp. 481-490. ISSN 0733-9364
Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.
Wong, A K D; Wong, F K W and Nadeem, A (2010) Attributes of building information modelling implementations in various countries. Architectural Engineering and Design Management, 6(4), pp. 288-302. ISSN 1745-2007
Wong, C H; Holt, G D and Harris, P T (2000) UK civil engineering practitioners' perceptions of contractor prequalification criteria. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Wong, F K W and Kong, L S P (1998) Marketization of state-owned housing in China: Comfortable housing project in Beijing. Journal of Financial Management of Property and Construction, 3(1), pp. 27-42. ISSN 1366-4387
Wong, K C; So, A T P and Yu, N H W (2001) The financial viablity of intelligent buildings: A Faustmann approach of assessment. Journal of Financial Management of Property and Construction, 6(1), pp. 41-50. ISSN 1366-4387
Wong, K-w K (2014) Integrative approach to addressing societal needs in infrastructure development projects. PhD thesis, University of Hong Kong, Hong Kong.
Wong, M O; Zhang, Z and Pan, W (2024) Multiuser virtual reality-enabled collaborative heavy lift planning in construction. Journal of Construction Engineering and Management, 150(4): 04024022, ISSN 0733-9364
Wong, T; Wei, Y; Zeng, Y; Jie, Y and Zhao, X (2025) A novel real-time torque prediction of epb shield in mixed ground using machine learning method based on geological knowledge fusion. Journal of Construction Engineering and Management, 151(3): 04025005, ISSN 0733-9364
Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.
Wood, G; Davis, P; Eadie, R; Perera, S and Heaney, G (2011) Key process area mapping in the production of an e-capability maturity model for UK construction organisations. Journal of Financial Management of Property and Construction, 16(3), pp. 197-210. ISSN 1366-4387
Wood, G D (2012) Research, practice and education in the built environment. PhD thesis, University of Salford, UK.
Wood, H L and Ashton, P (2007) An investigation to identify the role of pre-construction site investigative information used by small medium sized enterprises (SME). In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Woolery, J C and Crandall, K C (1983) Stochastic network model for planning scheduling. Journal of Construction Engineering and Management, 109(3), pp. 342-354. ISSN 0733-9364
Wu, X.; Schmidt, R.; Wilcockson, T. D.; Wang, W. and Liu, H. (2026) Eye-tracking and place attachment: Visual and emotional engagement in higher education atrium spaces. Building Research & Information, 54(5), pp. 652-669. ISSN 0961-3218
Wu, Z.; Park, A.; Awada, M. and Assaad, R. H. (2026) School building conditions and chronic absenteeism within socioeconomic contexts: A component-level statistical analysis in New York state. Engineering, Construction and Architectural Management, 33(15), pp. 432-457. ISSN 0969-9988
Wu, C; Chen, C; Jiang, R; Wu, P; Xu, B and Wang, J (2019) Understanding laborers' behavioral diversities in multinational construction projects using integrated simulation approach. Engineering, Construction and Architectural Management, 26(9), pp. 2120-2146. ISSN 0969-9988
Wu, H; Zhang, P; Li, H; Zhong, B; Fung, I W H and Lee, Y Y R (2022) Blockchain technology in the construction industry: Current status, challenges, and future directions. Journal of Construction Engineering and Management, 148(10): 03122007, ISSN 0733-9364
Wu, H-C (2007) Business failure prediction model for the construction industry using financial ratios and entropy measures with discriminant analysis. PhD thesis, University of Warwick, UK.
Wu, Hongjuan (2021) Challenges of prefabricated housing in China: Supply chain, stakeholders, and transaction costs. PhD thesis, Delft University of Technology, Netherlands.
Wu, K and García De Soto, B (2021) Lifting sequence optimization of luffing tower cranes considering motion paths with dynamic programming. Journal of Construction Engineering and Management, 147(10): 04021126, ISSN 0733-9364
Wu, M; Wing Chau, K; Shen, Q and Yin Shen, L (2012) Net asset value-based concession duration model for BOT contracts. Journal of Construction Engineering and Management, 138(2), pp. 304-308. ISSN 0733-9364
Wu, M L and Lo, H P (2009) Optimal strategy modeling for price-time biparameter construction bidding. Journal of Construction Engineering and Management, 135(4), pp. 298-306. ISSN 0733-9364
Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364
Wu, S; Clements-Croome, D; Fairey, V; Albany, B; Sidhu, J; Desmond, D and Neale, K (2006) Reliability in the whole life cycle of building systems. Engineering, Construction and Architectural Management, 13(2), pp. 136-153. ISSN 0969-9988
Wu, Shaoze (2024) Enhancing construction workforce safety through formulating an augmented reality digital twin system. PhD thesis, RMIT University, Australia.
Wu, Z and Ma, G (2023) Automatic generation of BIM-based construction schedule: Combining an ontology constraint rule and a genetic algorithm. Engineering, Construction and Architectural Management, 30(10), pp. 5253-5279. ISSN 0969-9988
Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333. ISSN 0969-9988
Wuni, I Y; Shen, G Q; Ogungbile, A J and Ayitey, J Z (2022) Four-pronged decision support framework for implementing industrialized construction projects. Construction Innovation, 22(2), pp. 263-283. ISSN 1471-4175
Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387
Wyke, S; Lindhard, S M and Larsen, J K (2024) Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2415-2436. ISSN 0969-9988
Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Xia, B; Rosly, N; Wu, P; Bridge, A and Pienaar, J (2016) Improving sustainability literacy of future quantity surveyors. Smart and Sustainable Built Environment, 5(4), pp. 325-339. ISSN 2046-6099
Xiao, H and Proverbs, D (2002) Construction time performance: An evaluation of contractors from Japan, the UK and the US. Engineering, Construction and Architectural Management, 9(2), pp. 81-89. ISSN 0969-9988
Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 0969-9988
Xie, X.; Liao, L.; Wen, Y.; Li, S. and Mo, L. (2026) Understanding safety hazard identification in construction: Role of emotion, gender, and regulatory focus. Journal of Construction Engineering and Management, 152(9): 04026136, ISSN 0733-9364
Xie, H (2012) Improving dynamic project control in tunnel construction. PhD thesis, University of Alberta, Canada.
Xie, H; Hong, Y and Brilakis, I (2022) Analysis of user needs in time-related risk management for holistic project understanding. Journal of Construction Engineering and Management, 148(4): 05022002, ISSN 0733-9364
Xie, H; Hong, Y; Xin, M; Brilakis, I and Shi, O (2025) Identification and analysis of communication barriers for construction projects with time uncertainties. Engineering, Construction and Architectural Management, 32(1), pp. 305-331. ISSN 0969-9988
Xie, L L; Chen, Y; Wu, S; Chang, R D and Han, Y (2024) Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(7), pp. 2852-2877. ISSN 0969-9988
Xie, W; Zhao, T; Tang, J and Zhang, Y (2017) Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge. Journal of Construction Engineering and Management, 143(8): 04017059, ISSN 0733-9364
Xiong, B; Ye, K; Skitmore, M; Jiang, W and Qin, B (2022) Chinese perceptions of corporate social responsibility: An analysis of annual reports in the housing sector (Chinese perceptions of corporate social responsibility). International Journal of Construction Management, 22(13), pp. 2586-2597. ISSN 1562-3599
Xiong, Y and Kuang, Y (2008) Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off. Journal of Construction Engineering and Management, 134(2), pp. 153-156. ISSN 0733-9364
Xu, T.; Song, Z.; Fan, S. and Guo, D. (2026) Improved risk assessment model using the cloud theory of the existing tunnel in foundation pit construction environment. Engineering, Construction and Architectural Management, 33(5), pp. 3737-3760. ISSN 0969-9988
Xu, J; Teng, Y and Pan, W (2021) A BIM-LCA integrated method for enhancing efficiency of embodied carbon estimation of prefabricated high-rise buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364
Xu, Ming (2010) The value of critical project decisions: measurement and modelling. PhD thesis, University of Melbourne, Australia.
Xu, W; Cong, J and Proverbs, D G (2023) Evaluation of infrastructure resilience. International Journal of Building Pathology and Adaptation, 41(2), pp. 378-400. ISSN 23984708
Xu, X (2024) A multi-agent reinforcement learning task allocation framework for navigation sequences of construction robots. PhD thesis, New York University Tandon School of Engineering, USA.
Xu, Yongzhi (2021) Automated and real-time scan-to-BIM through deep learning-based object detection. PhD thesis, University of New South Wales, Australia.
Xu, Z; Liang, Y; Lu, H; Kong, W and Wu, G (2023) An approach for monitoring prefabricated building construction based on feature extraction and point cloud segmentation. Engineering, Construction and Architectural Management, 30(10), pp. 5302-5332. ISSN 0969-9988
Xue, J; Shen, G Q; Deng, X; Ogungbile, A J and Chu, X (2023) Evolution modeling of stakeholder performance on relationship management in the dynamic and complex environments of megaprojects. Engineering, Construction and Architectural Management, 30(4), pp. 1536-1557. ISSN 0969-9988
Xue, J; Shen, G Q; Li, Y; Han, S and Chu, X (2021) Dynamic analysis on public concerns in Hong Kong-zhuhai-macao bridge: Integrated topic and sentiment modeling approach. Journal of Construction Engineering and Management, 147(6): 04021049, ISSN 0733-9364
Xue, J; Shen, G Q; Yang, R J; Zafar, I and Ekanayake, E M A C (2020) Dynamic network analysis of stakeholder conflicts in megaprojects: Sixteen-year case of Hong Kong-Zhuhai-Macao Bridge. Journal of Construction Engineering and Management, 146(9): 04020103, ISSN 0733-9364
Xue, J; Shen, G Q; Yang, R J; Zafar, I; Ekanayake, E M A C; Lin, X and Darko, A (2020) Influence of formal and informal stakeholder relationship on megaproject performance: A case of China. Engineering, Construction and Architectural Management, 27(7), pp. 1505-1531. ISSN 0969-9988
Yadav, H; Soni, U and Kumar, G (2023) Analysing challenges to smart waste management for a sustainable circular economy in developing countries: A fuzzy DEMATEL study. Smart and Sustainable Built Environment, 12(2), pp. 361-384. ISSN 2046-6099
Yadav, S and Ray, G S (2015) Supply chain management in flyover projects in India. Journal of Construction in Developing Countries, 20(1), pp. 25-47. ISSN 1823-6499
Yakubu, O A (2010) Cost and time control practice of construction projects in the UK: The pursuit of effective management control. PhD thesis, University of the West of England, Bristol, UK.
Yakubu, O A and Sun, M (2009) A survey of construction project cost and time control practices in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Yamazaki, Y (1995) An integrated construction planning system using object-oriented product and process modelling. Construction Management and Economics, 13(5), pp. 417-426. ISSN 01446193
Yamin, R A (2001) Cumulative effect of productivity rates in linear schedules. PhD thesis, Purdue University, USA.
Yamusa, M. A.; Dandago, A. A.; Lawal, H. S.; Saka, A. B.; Abubakar, M. and Abdullahi, M. (2025) Quantitative evaluation and modelling of uncertainty factors impacting duration of building renovation projects. Engineering, Construction and Architectural Management, 33(5), pp. 4181-4210. ISSN 0969-9988
Yamín, R A and Harmelink, D J (2001) Comparison of linear scheduling model (LSM) and critical path method (CPM). Journal of Construction Engineering and Management, 127(5), pp. 374-381. ISSN 0733-9364
Yan, D; Ding, Y; Sunindijo, R Y; Wang, C C and Yang, Z (2026) Key factors in women's managerial advancement in the construction industry: Insights from machine learning. International Journal of Construction Management, 26(4), pp. 679-693. ISSN 1562-3599
Yan, H.; Liu, C.; Yang, X.; Li, X. and Li, J. (2026) Digital twin-enabled 3D near-misses prediction method based on trajectories and postures for proactive construction safety management. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988
Yan, X and Kim, Y C (2018) A conceptual framework of ITSMCA for a building collapse accident. Engineering, Construction and Architectural Management, 25(6), pp. 721-737. ISSN 0969-9988
Yang, C P (2006) Factors affecting the performance of public projects in Taiwan. Journal of Construction Research, 7(1), pp. 207-225. ISSN 1609-9451
Yang, H; Chan, A P C; Yeung, J F Y and Li, Q (2012) Concentration effect on construction firms: Tests of resource partitioning theory in Jiangsu province (China) from 1989 to 2007. Journal of Construction Engineering and Management, 138(1), pp. 144-153. ISSN 0733-9364
Yang, I T (2005) Chance-constrained time-cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), pp. 1002-1012. ISSN 0733-9364
Yang, I T (2006) Using Gaussian copula to simulate repetitive projects. Construction Management and Economics, 24(9), pp. 901-909. ISSN 1466433X
Yang, I T (2007) Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis. Journal of Construction Engineering and Management, 133(7), pp. 498-505. ISSN 0733-9364
Yang, I T and Ioannou, P G (2004) Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, 22(6), pp. 619-630. ISSN 01446193
Yang, I T; Lin, Y C and Lee, H Y (2014) Use of support vector regression to improve computational efficiency of stochastic time-cost trade-off. Journal of Construction Engineering and Management, 140(1): 04013036, ISSN 0733-9364
Yang, J (2022) Integrated decision support system for the selection and implementation of delay analysis in construction projects. PhD thesis, Illinois Institute of Technology, USA.
Yang, J and Price, A D F (2006) Innovative design and construction solutions for improved therapeutic healing environments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Yang, J B and Chen, Y F (2025) S-curve adjustment approaches for a force majeure event: COVID-19 as an example. Engineering, Construction and Architectural Management, 32(3), pp. 1621-1642. ISSN 0969-9988
Yang, J B and Lai, T H (2024) Selecting EVM, esm and EDM(t) for managing construction project schedule. Engineering, Construction and Architectural Management, 31(12), pp. 4988-5006. ISSN 0969-9988
Yang, J B and Tsai, M K (2011) Computerizing ICBF method for schedule delay analysis. Journal of Construction Engineering and Management, 137(8), pp. 583-591. ISSN 0733-9364
Yang, J B and Yin, P C (2009) Isolated collapsed but-for delay analysis methodology. Journal of Construction Engineering and Management, 135(7), pp. 570-578. ISSN 0733-9364
Yang, L and Shi, J J (2010) Experimental study on the impact of rainfall on RCC construction. Journal of Construction Engineering and Management, 136(5), pp. 477-483. ISSN 0733-9364
Yang, L R (2007) Exploring the links between technology usage and project outcomes. Construction Management and Economics, 25(10), pp. 1041-1051. ISSN 1466433X
Yang, L-R (2003) Influence of technology on project success measures. PhD thesis, University of Texas at Austin, USA.
Yang, N (2010) Optimization of highway work zone decisions considering short-term and long-term impacts. PhD thesis, University of Maryland, College Park, USA.
Yang, R J; Gunarathna, C L; McDermott, V; Lingard, H; Zhao, H and Liu, C (2020) Opportunities for improving construction health and safety using real-time H&S management innovations: A socio-technical-economic perspective. International Journal of Construction Management, 20(5), pp. 534-554. ISSN 1562-3599
Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364
Yang, Y; Pan, M and Pan, W (2022) Integrated offsite logistics scheduling approach for high-rise modular building projects. Journal of Construction Engineering and Management, 148(6): 04022032, ISSN 0733-9364
Yang, Y C; Park, C J; Kim, J H and Kim, J J (2007) Management of daily progress in a construction project of multiple apartment buildings. Journal of Construction Engineering and Management, 133(3), pp. 242-253. ISSN 0733-9364
Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(6): 04024048, ISSN 0733-9364
Yang, Z; Yuan, Y; Zhang, M; Zhao, X and Tian, B (2019) Assessment of construction workers' labor intensity based on wearable smartphone system. Journal of Construction Engineering and Management, 145(7): 04019039, ISSN 0733-9364
Yao, M; Wang, F; Chen, Z and Ye, H (2020) Optimal incentive contract with asymmetric cost information. Journal of Construction Engineering and Management, 146(6): 04020054, ISSN 0733-9364
Yao, Z; Zhang, L; Hua, Z and Luo, C (2025) Low-carbon multiobjective optimization for repetitive projects based on crew-based scheduling strategy. Journal of Construction Engineering and Management, 151(1): 04024183, ISSN 0733-9364
Yap, J B H; Abdul-Rahman, H and Wang, C (2018) Preventive mitigation of overruns with project communication management and continuous learning: PLS-SEM approach. Journal of Construction Engineering and Management, 144(5): 4018025, ISSN 0733-9364
Yap, J B H and Chow, I N (2020) Investigating the managerial "nuts and bolts" for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 331-348. ISSN 2044-124X
Yap, J B H; Hew, Q L T and Skitmore, M (2022) Student learning experiences in higher education: Investigating a quantity surveying programme in Malaysia. Construction Economics and Building, 22(1), pp. 1-20. ISSN 2204-9029
Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531
Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499
Yap, J B H and Lock, A (2017) Analysing the benefits, techniques, tools and challenges of knowledge management practices in the Malaysian construction SMEs. Journal of Engineering, Design and Technology, 15(6), pp. 803-825.
Yap, J B H; Low, P L and Wang, C (2017) Rework in Malaysian building construction: Impacts, causes and potential solutions. Journal of Engineering, Design and Technology, 15(5), pp. 591-618.
Yap, J B H and Shavarebi, K (2022) Enhancing project delivery performances in construction through experiential learning and personal constructs: Competency development. International Journal of Construction Management, 22(3), pp. 436-452. ISSN 1562-3599
Yap, J B H and Skitmore, M (2018) Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), pp. 218-238. ISSN 1745-2007
Yap, J B H; Skitmore, M; Lim, Y W; Loo, S C and Gray, J (2022) Assessing the expected current and future competencies of quantity surveyors in the Malaysian built environment. Engineering, Construction and Architectural Management, 29(6), pp. 2415-2436. ISSN 0969-9988
Yasin, F and Egbu, C (2010) Exploitation of knowledge mapping benefits in the facilities performance evaluation process: A conceptual framework. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Yates, J K (1993) Construction decision support system for delay analysis. Journal of Construction Engineering and Management, 119(2), pp. 226-244. ISSN 0733-9364
Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Yaworsky, R A (1994) Risk planning for large and BOT projects: A holistic framework. PhD thesis, University of British Columbia, Canada.
Yazdi, Alireza Jalali (2022) Developing an integrated design support framework to enable mass-customisation in multi-storey timber building projects. PhD thesis, University of Technology Sydney, Australia.
Ye, K M (2013) A conceptual model to improve building commissioning in construction projects: Case studies of a public institution of higher learning in Malaysia. PhD thesis, University of Malaya, Malaysia.
Ye, S and Tiong, R L K (2003) The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics, 21(5), pp. 471-482. ISSN 01446193
Yean, F; Ling, Y and Ang, W T (2013) Using control systems to improve construction project outcomes. Engineering, Construction and Architectural Management, 20(6), pp. 576-588. ISSN 0969-9988
Yeganeh, A; McCoy, A P; Reichard, G; Schenk, T and Hankey, S (2021) Green building and policy innovation in the US low-income housing tax credit programme. Building Research & Information, 49(5), pp. 543-560. ISSN 0961-3218
Yeganeh, A A; Azizi, M and Falsafi, R (2019) Root causes of design-construction interface problems in Iranian design-build projects. Journal of Construction Engineering and Management, 145(12): 05019014, ISSN 0733-9364
Yeh, Y C; Hsu, D S and Kuo, Y H (1991) Expert system for diagnosing damage of prestressed concrete pile. Journal of Construction Engineering and Management, 117(1), pp. 13-26. ISSN 0733-9364
Yeoh, K-W (2012) Construction requirements driven planning and scheduling. PhD thesis, National University of Singapore, Singapore.
Yeung, A T; Ng, S T; Tham, L G and Lee, P K K (2010) HKU's double professional civil engineering and law programme. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(2), pp. 77-85. ISSN 17514312
Yeung, J F Y; Chan, A P C and Chan, D W M (2008) Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(3), pp. 277-301. ISSN 1466433X
Yeung, J F Y; Chan, A P C; Chan, D W M; Chiang, Y H and Yang, H (2013) Developing a benchmarking model for construction projects in Hong Kong. Journal of Construction Engineering and Management, 139(6), pp. 705-716. ISSN 0733-9364
Yeung, J F Y; Chan, A P C; Chan, D W M and Li, L K (2007) Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study. Construction Management and Economics, 25(12), pp. 1219-1237. ISSN 1466433X
Yeung, J F Y; Chan, D W M; Chan, J H L and Lok, K L (2023) Development of a composite project performance index for the New Engineering Contract (necppi) of construction projects in Hong Kong: A Delphi study. International Journal of Construction Management, 23(16), pp. 2804-2817. ISSN 1562-3599
Yi, J; Chen, H and Li, S (2010) Determination of contract time and incentive and disincentive values of highway construction projects. International Journal of Construction Education and Research, 6(4), pp. 285-302. ISSN 1557-8771
Yi, K J and Langford, D (2006) Scheduling-based risk estimation and safety planning for construction projects. Journal of Construction Engineering and Management, 132(6), pp. 626-635. ISSN 0733-9364
Yi, K J; Lee, H S and Choi, Y K (2002) Network creation and development for repetitive-unit projects. Journal of Construction Engineering and Management, 128(3), pp. 257-264. ISSN 0733-9364
Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599
Yin, J; Li, J; Yang, A and Cai, S (2024) Optimization of service scheduling problem for overlapping tower cranes with cooperative coevolutionary genetic algorithm. Engineering, Construction and Architectural Management, 31(3), pp. 1348-1369. ISSN 0969-9988
Yin, X; Bouferguene, A and Al-Hussein, M (2020) Data-driven sewer pipe data random generation and validation. Journal of Construction Engineering and Management, 146(12): 04020131, ISSN 0733-9364
Yin, X; Chen, Y; Bouferguene, A; Zaman, H; Al-Hussein, M and Russell, R (2020) Data-driven framework for modeling productivity of closed-circuit television recording process for sewer pipes. Journal of Construction Engineering and Management, 146(8): 04020093, ISSN 0733-9364
Yiğit, A Y; Gamze Hamal, S N; Ulvi, A and Yakar, M (2024) Comparative analysis of mobile laser scanning and terrestrial laser scanning for the indoor mapping. Building Research & Information, 52(4), pp. 402-417. ISSN 0961-3218
Yllmaz, M and Dede, T (2025) Optimizing multiobjective time-cost-quality problems in construction projects: Efficacy of strength Pareto-based rao algorithms. Journal of Construction Engineering and Management, 151(5): 04025036, ISSN 0733-9364
Yogeshwaran, G; Perera, B A K S and Ariyachandra, M R M F (2018) Competencies expected of graduate quantity surveyors working in developing countries. Journal of Financial Management of Property and Construction, 23(2), pp. 202-220. ISSN 1366-4387
Yogeswaran, K; Kumaraswamy, M M and Miller, D R A (1998) Claims for extensions of time in civil engineering projects. Construction Management and Economics, 16(3), pp. 283-293. ISSN 01446193
Yokouchi, N; Ambe, T; Fujisaki-Sueda-Sakai, M and Ozawa, K (2024) Workplace bullying and harassment in the Japanese construction industry: prevalence and associations with subjective health and work attractiveness. Construction Management and Economics, 42(8), pp. 741-757. ISSN 01446193
Yonat, N; Isaac, S and Shohet, I M (2025) Complex infrastructure systems analysis and management: The theory of faults. Smart and Sustainable Built Environment, 14(3), pp. 599-624. ISSN 2046-6099
Yong-Woo, K and Rhee, B-D (2024) Incentive-based coordination for scheduled delivery in prefab construction. Construction Management and Economics, 42(7), pp. 624-639. ISSN 01446193
Yoon, J; Yu, I and Jung, D (2018) Factors needed for the development of a constructability assessment model for building renovation and extension in Korea. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Yoon, Jong Han (2023) Blockchain-enabled smart contract system for creating system-based trust in subcontracting process. PhD thesis, Georgia Institute of Technology, USA.
Yoon, S; Kang, K; Yoon, Y; Hastak, M and Ji, R (2018) Systematic decision-making process for composite pavement maintenance. Journal of Construction Engineering and Management, 144(6): 04018044, ISSN 0733-9364
You, H; Xu, F and Du, J (2023) Improved boundary identification of stacked objects with sparse lidar augmentation scanning. Journal of Construction Engineering and Management, 149(11): 04023104, ISSN 0733-9364
You, X (2010) Risk analysis in tunneling with imprecise probabilities. PhD thesis, University of Texas at Austin, USA.
Younes, B; Bouferguène, A; Al-Hussein, M and Yu, H (2015) Overdue invoice management: Markov chain approach. Journal of Construction Engineering and Management, 141(1): 04014062, ISSN 0733-9364
Young, B A (1988) Career development in construction management. PhD thesis, University of Manchester, UK.
Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364
Youssef, M; Mohamed, M S E and Balah, A A S (2024) Fuzzy model for Libyan construction projects delivery system selection. International Journal of Construction Management, 24(6), pp. 643-650. ISSN 1562-3599
Yu, H.; Peng, Z. and Wu, Z. (2026) Coupled analysis and simulation of safety risks in deep foundation pit construction for subway stations based on the N-K model and system dynamics. Journal of Construction Engineering and Management, 152(7): 04026088, ISSN 0733-9364
Yu, H; Tweed, T; Al-Hussein, M and Nasseri, R (2009) Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management, 135(8), pp. 782-790. ISSN 0733-9364
Yu, M; Ruan, W; Zhou, Y and Zhao, Y (2025) Flow shop scheduling for prefabricated components production considering parallel machines and buffer constraints. Journal of Construction Engineering and Management, 151(4): 04025010, ISSN 0733-9364
Yu, M; Wang, L; Ruan, W and Zheng, W (2025) Robust optimization for precast component production scheduling considering component transfer. Journal of Construction Engineering and Management, 151(10): 04025156, ISSN 0733-9364
Yuan, Z; Chang, Y; Chen, Y; Wang, Y; Huang, W and Chen, C (2024) Simulating and optimizing precast wall lifting in prefabricated building construction. Engineering, Construction and Architectural Management, 31(6), pp. 2437-2456. ISSN 0969-9988
Yue, H; Sun, Y; Zeng, N; Chen, S; Tan, Y and Wang, Q (2025) Legged robots for construction management: Applications and challenges. Journal of Construction Engineering and Management, 151(8): 03125006, ISSN 0733-9364
Yumul, John (2025) Evaluation of machine learning models to predict cost overruns for New York city capital projects. DEngr thesis, George Washington University, USA.
Yun, G Y (2008) Occupant behaviour in buildings: Thermal performance implications of window use patterns. PhD thesis, University of Cambridge, UK.
Yun, L; Wan, J; Wang, G; Bai, J and Zhang, B (2020) Exploring the missing link between top management team characteristics and megaproject performance. Engineering, Construction and Architectural Management, 27(5), pp. 1039-1064. ISSN 0969-9988
Yun Zhen, G W; Wai Wah, L; Sui Pheng, L and Shi Yee, W (2026) Application of building information modelling (BIM) technology in risk management of high-rise building (hrb) projects in Malaysia. International Journal of Construction Management, 26(2), pp. 332-348. ISSN 1562-3599
Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.
Yusof, I H M; An, M and Barghi, M H (2015) Integration of lean construction considerations into design process of construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Yılmaz, M and Dede, T (2026) Multi-objective time-cost-safety risk trade-off optimization for the construction scheduling problem. Engineering, Construction and Architectural Management, 33(1), pp. 380-412. ISSN 0969-9988
Zaalouk, A; Altaf, M S and Han, S (2025) Operations-oriented supply chain master planning in panelized construction using hybrid multiagent simulation. Journal of Construction Engineering and Management, 151(10): 04025206, ISSN 0733-9364
Zabihi Kolaei, A; Khanzadi, M and Ghodrati Amiri, G (2026) Integration of augmented reality and blockchain technologies for visualizing and documenting change orders in a building project: Case study. Journal of Construction Engineering and Management, 152(2): 04025251, ISSN 0733-9364
Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Zaeri, F; Rotimi, J O B; Hosseini, M R and Cox, J (2017) Implementation of the LPS using an excel spreadsheet: A case study from the New Zealand construction industry. Construction Innovation, 17(3), pp. 324-339. ISSN 1471-4175
Zafar, I; Wuni, I Y; Shen, G Q P; Ahmed, S and Yousaf, T (2022) A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: The case of Pakistan. International Journal of Construction Management, 22(4), pp. 732-750. ISSN 1562-3599
Zagia, F.; Kajewski, S.; Omrani, S. and Motamedisedeh, O. (2026) Prioritizing the key causes of construction project delay in different countries: A cross-sectional analysis of different project types. International Journal of Construction Management, 26(9), pp. 1879-1904. ISSN 1562-3599
Zaheer, M I; Ajayi, S O; Sambo Lyson, Z; Oyegoke, A and Kazemi, H (2021) Understanding the key competencies of market-ready building surveying graduates from employers' perspectives. Journal of Engineering, Design and Technology, 19(1), pp. 291-314. ISSN 1726-0531
Zahoor, H; Khan, R M; Nawaz, A; Ayaz, M and Maqsoom, A (2022) Project control and forecast assessment of building projects in Pakistan using earned value management. Engineering, Construction and Architectural Management, 29(2), pp. 842-869. ISSN 0969-9988
Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364
Zainal Abidin, N A (2018) Resilience of Malaysian public sector construction industry to supply chain disruptions. PhD thesis, University of Huddersfield, UK.
Zakeri, M (1996) An evaluation of productivity and management practice in the Iranian construction industry. PhD thesis, University of Wolverhampton, UK.
Zakharova, J; Afefy, H M; Hamood, A; Hampton, P; Gowayed, M A; Ragab, M and Abouali, M G (2025) Can the degree apprenticeship become the degree of difference in Egypt? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 76-82. ISSN 17514304
Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.
Zaky, N; Ahmed, M Z; Alarjani, A and Attia, E A (2025) Lean manufacturing implementation in iron and steel industries: Effect of wastes management on the production costs. Journal of Engineering, Design and Technology, 23(2), pp. 525-545. ISSN 1726-0531
Zaman, A A U and Abdelaty, A (2025) Effects of uav imagery overlap on photogrammetric data quality for construction applications. International Journal of Construction Management, 25(16), pp. 1901-1916. ISSN 1562-3599
Zami, M S (2021) Enablers supporting acceptance of earth-based material in UK urban housing sector. Architectural Engineering and Design Management, 17(1-2), pp. 92-109. ISSN 1745-2007
Zarei, F; Arashpour, M; Mirnezami, S A; Shahabi-Shahamiri, R and Ghasemi, M (2024) Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study. International Journal of Construction Management, 24(8), pp. 820-833. ISSN 1562-3599
Zarghami, S A (2022) Forecasting project duration in the face of disruptive events: A resource-based approach. Journal of Construction Engineering and Management, 148(5): 04022016, ISSN 0733-9364
Zarghami, S A (2022) Prioritizing construction activities: Addressing the flaws of schedule-based indexes. Journal of Construction Engineering and Management, 148(8): 04022069, ISSN 0733-9364
Zarghami, S A (2024) No scheduling problem but rather a rescheduling problem: Measuring robustness of schedule network in construction projects. Journal of Construction Engineering and Management, 150(2): 04023157, ISSN 0733-9364
Zarghami, S A and Zwikael, O (2024) Buffer allocation in construction projects: a disruption mitigation approach. Engineering, Construction and Architectural Management, 31(10), pp. 3946-3972. ISSN 0969-9988
Zaryoun, M; Hosseini, M and Soleymani, K (2022) Sustainable architecture and earthquake resilience of vernacular zegalli houses in Northern Iran. Engineering, Construction and Architectural Management, 29(2), pp. 1061-1085. ISSN 0969-9988
Zawawi, M I b Z (2017) Improving competition within public private partnership (PPP) procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.
Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), pp. 170-189. ISSN 0969-9988
Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988
Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364
Zayed, T M (2001) Assessment of productivity for concrete bored pile construction. PhD thesis, Purdue University, USA.
Zayed, T M and Halpin, D (2001) Simulation of concrete batch plant production. Journal of Construction Engineering and Management, 127(2), pp. 132-141. ISSN 0733-9364
Zayed, T M and Halpin, D W (2004) Simulation as a tool for pile productivity assessment. Journal of Construction Engineering and Management, 130(3), pp. 394-404. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Deterministic models for assessing productivity and cost of bored piles. Construction Management and Economics, 23(5), pp. 531-543. ISSN 01446193
Zech, W C (2004) Enhancing work zone safety. PhD thesis, State University of New York at Buffalo, USA.
Zeiler, W and Savanovic, P (2009) Integral morphological C-K design approach for multidisciplinary building design. Architectural Engineering and Design Management, 5(4), pp. 193-214. ISSN 1745-2007
Zeitoun, A A (1992) Evaluation of cost and schedule growth trends during construction. PhD thesis, Oklahoma State University, USA.
Zeng, N; Liu, Y and König, M (2023) 4D BIM-enabled look-ahead scheduling for early warning of off-site supply chain disruptions. Journal of Construction Engineering and Management, 149(1): 04022154, ISSN 0733-9364
Zeng, R; Shi, J J S; Wang, C and Lu, T (2024) Integrating as-built BIM model from point cloud data in construction projects. Engineering, Construction and Architectural Management, 31(9), pp. 3557-3574. ISSN 0969-9988
Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X
Zeng, Y (2010) Risk management for enterprise resource planning system implementations in project-based firms. PhD thesis, University of Maryland, College Park, USA.
Zeng, Z (2007) Coordinated rescheduling of precast production. PhD thesis, National University of Singapore, Singapore.
Zerihun, A; Beza, D and Idrisi, M J (2025) Factors affecting contractor and subcontractor relationship and their effects on building project performance: Case of Addis Ababa. International Journal of Construction Management, 25(14), pp. 1716-1724. ISSN 1562-3599
Zhang, P; Sing, M C P; Chan, A P C and Liu, H J (2026) Utilizing deep learning for the extraction of cost risk factors from project risk registers: Enhancing contingency estimation. Journal of Construction Engineering and Management, 152(5): 04026049, ISSN 0733-9364
Zhang, X. (2026) Simulation study on schedule control for engineering design based on system dynamics. Journal of Construction Engineering and Management, 152(10): 04026166, ISSN 0733-9364
Zhang, Y.; Chang, R. D.; Omrany, H.; Zuo, J.; Li, L.; Bamborough, C. E. and Haeusler, H. M. (2026) Exploring professional attitudes on automated construction progress monitoring: A q methodology approach. Engineering, Construction and Architectural Management, 33(15), pp. 386-413. ISSN 0969-9988
Zhang, Z.; Wang, Y.; Liu, J.; Wang, Y.; Liu, C. and Geng, X. (2026) Transport risk assessment for China's prefabricated construction supply chain: Integrating game theory and fuzzy Bayesian network. Engineering, Construction and Architectural Management, pp. 1-24. ISSN 0969-9988
Zhang, C (2017) Human-centered automation for resilience in acquiring construction field information. PhD thesis, Arizona State University, USA.
Zhang, C; Shen, W and Ye, Z (2022) Technical feasibility analysis on applying ultra-wide band technology in construction progress monitoring. International Journal of Construction Management, 22(15), pp. 2951-2965. ISSN 1562-3599
Zhang, C; Zayed, T and Hammad, A (2008) Resource management of bridge deck rehabilitation: Jacques cartier bridge case study. Journal of Construction Engineering and Management, 134(5), pp. 311-319. ISSN 0733-9364
Zhang, C Y; Dainty, A and Thorpe, T (2009) Exploring the potential of massively multiplayer online games for informing construction design decisions. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Zhang, D and Ho, C H (2024) Distribution fitting and anova test to analyze pavement sensing patterns for condition assessments. Built Environment Project and Asset Management, 14(4), pp. 663-676. ISSN 2044-124X
Zhang, F; Liu, H; Wang, L; Chen, Z; Zhang, Q and Guo, L (2025) State awareness and collision risk assessment algorithm for tower crane based on bidirectional inverse perspective mapping and skeleton key points. Journal of Construction Engineering and Management, 151(2): 04024205, ISSN 0733-9364
Zhang, H and Li, H (2010) Multi-objective particle swarm optimization for construction time-cost tradeoff problems. Construction Management and Economics, 28(1), pp. 75-88. ISSN 1466433X
Zhang, H; Li, H and Lu, M (2008) Modeling time-constraints in construction operations through simulation. Journal of Construction Engineering and Management, 134(7), pp. 545-554. ISSN 0733-9364
Zhang, H; Li, H and Tam, C M (2004) Fuzzy discrete-event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management, 11(6), pp. 426-437. ISSN 0969-9988
Zhang, H; Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(2), pp. 159-169. ISSN 01446193
Zhang, H; Li, H and Tam, C M (2006) Particle swarm optimization for preemptive scheduling under break and resource-constraints. Journal of Construction Engineering and Management, 132(3), pp. 259-267. ISSN 0733-9364
Zhang, H; Li, L; Demeulemeester, E; Bai, S and Zhang, J (2025) Heuristic methods for dynamic multiproject scheduling problems with stochastic transfer times. Journal of Construction Engineering and Management, 151(2): 04024207, ISSN 0733-9364
Zhang, H and Tam, C M (2005) Consideration of break in modeling of construction processes. Engineering, Construction and Architectural Management, 12(4), pp. 373-390. ISSN 0969-9988
Zhang, J; Chen, F and Yuan, X X (2020) Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: A Canadian study. Construction Management and Economics, 38(8), pp. 739-755. ISSN 01446193
Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364
Zhang, J; Zhou, N; Hinge, A; Feng, W and Zhang, S (2016) Governance strategies to achieve zero-energy buildings in China. Building Research & Information, 44(5-6), pp. 604-618. ISSN 0961-3218
Zhang, K; Cui, Q and DeCorla-Souza, P (2025) Performance and efficiency diffusion of us surface transportation public-private partnerships. Journal of Construction Engineering and Management, 151(1): 04024192, ISSN 0733-9364
Zhang, L (2021) Artificial neural network intelligent technique and multiple nonlinear regression for prediction and optimization of the transmittance of lightpipes and implementation in BIM. PhD thesis, University of Nottingham, UK.
Zhang, L (2022) Risk management framework to guide off-site manufacturing process: a Chinese perspective. PhD thesis, University of Strathclyde, UK.
Zhang, L; Dai, G; Zou, X and Qi, J (2020) Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Engineering, Construction and Architectural Management, 27(10), pp. 3095-3113. ISSN 0969-9988
Zhang, L; Pan, C and Zou, X (2013) Criticality comparison between the repetitive scheduling method and the network model. Journal of Construction Engineering and Management, 139(10): 06013004, ISSN 0733-9364
Zhang, L and Qi, J (2012) Controlling path and controlling segment analysis in repetitive scheduling method. Journal of Construction Engineering and Management, 138(11), pp. 1341-1345. ISSN 0733-9364
Zhang, L; Zou, X and Kan, Z (2014) Improved strategy for resource allocation in repetitive projects considering the learning effect. Journal of Construction Engineering and Management, 140(11): 4014053, ISSN 0733-9364
Zhang, N and Tiong, R (2003) Integrated electronic commerce model for the construction industry. Journal of Construction Engineering and Management, 129(5), pp. 578-585. ISSN 0733-9364
Zhang, N; Wang, J; Al-Hussein, M and Yin, X (2023) BIM-based automated design of drainage systems for panelized residential buildings. International Journal of Construction Management, 23(15), pp. 2683-2698. ISSN 1562-3599
Zhang, S; Bogus, S M; Lippitt, C D; Kamat, V and Lee, S (2022) Implementing remote-sensing methodologies for construction research: An unoccupied airborne system perspective. Journal of Construction Engineering and Management, 148(9): 03122005, ISSN 0733-9364
Zhang, S; Du, C; Sa, W; Wang, C and Wang, G (2014) Bayesian-based hybrid simulation approach to project completion forecasting for underground construction. Journal of Construction Engineering and Management, 140(1): 04013031, ISSN 0733-9364
Zhang, S; Shang, C; Wang, C; Song, R and Wang, X (2019) Real-time safety risk identification model during metro construction adjacent to buildings. Journal of Construction Engineering and Management, 145(6): 04019034, ISSN 0733-9364
Zhang, W; Xue, N; Zhang, J and Zhang, X (2021) Identification of critical causal factors and paths of tower-crane accidents in China through system thinking and complex networks. Journal of Construction Engineering and Management, 147(12): 04021174, ISSN 0733-9364
Zhang, W; Zhang, H and Yu, L (2023) Collaborative planning for stacking and installation of prefabricated building components regarding crane-collision avoidance. Journal of Construction Engineering and Management, 149(6): 04023029, ISSN 0733-9364
Zhang, X (2005) Financial viability analysis and capital structure optimization in privatized public infrastructure projects. Journal of Construction Engineering and Management, 131(6), pp. 656-668. ISSN 0733-9364
Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364
Zhang, X (2018) Sustainable retrofitting of existing residential buildings at community scale in China. PhD thesis, Cardiff University, UK.
Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing. PhD thesis, University of Florida, USA.
Zhang, X; Azhar, S; Nadeem, A and Khalfan, M (2018) Using building information modelling to achieve lean principles by improving efficiency of work teams. International Journal of Construction Management, 18(4), pp. 293-300. ISSN 1562-3599
Zhang, X; Sexton, M G; Goulding, J S; Aouad, G and Kagioglou, M (2005) Performance modelling for the design of a hybrid concrete structural frame. Architectural Engineering and Design Management, 1(2), pp. 83-91. ISSN 1745-2007
Zhang, Y; Chang, R; Mao, W; Zuo, J; Liu, L and Han, Y (2024) Challenges of automating interior construction progress monitoring. Journal of Construction Engineering and Management, 150(9): 03124004, ISSN 0733-9364
Zhang, Y; Chang, R; Mao, W; Zuo, J; Zhang, W E and Liu, L (2025) Low-cost ios-based automated detection of under-construction interior drywalls: An exploratory study. Journal of Construction Engineering and Management, 151(10): 05025012, ISSN 0733-9364
Zhao, J. and Xu, Z. (2026) A generalizable deep reinforcement learning-based algorithm for priority rule scheduling in stochastic resource-constrained project scheduling. Journal of Construction Engineering and Management, 152(9): 04026156, ISSN 0733-9364
Zhao, J (2014) Performance modeling and optimization solutions for networking systems. PhD thesis, University of Hong Kong, Hong Kong.
Zhao, S; Lu, T F; Statsenko, L; Koch, B and Garcia, C (2022) A framework for near real-time rom stockpile modelling to improve blending efficiency. Journal of Engineering, Design and Technology, 20(2), pp. 497-515. ISSN 1726-0531
Zhao, Y; Chen, W; Arashpour, M; Yang, Z; Shao, C and Li, C (2022) Predicting delays in prefabricated projects: Sd-bp neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29(4), pp. 1753-1776. ISSN 0969-9988
Zhao, Y; Chen, W; Yang, Z; Li, Z and Wang, Y (2023) Analysis on risk factors related delay in pcps. Engineering, Construction and Architectural Management, 30(10), pp. 4609-4644. ISSN 0969-9988
Zhao, Y; Jing, H; Yu, M and Li, J (2025) Efficient project management of historical building groups: a BIM-based approach with critical chain method and 5D simulation. International Journal of Construction Management, 25(7), pp. 826-839. ISSN 1562-3599
Zhao, Y; Mourshed, M and Wright, J (2009) Factors influencing the design of spatial layouts in healthcare buildings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Zhao, Z Y; Lv, Q L; Zuo, J and Zillante, G (2010) Prediction system for change management in construction project. Journal of Construction Engineering and Management, 136(6), pp. 659-669. ISSN 0733-9364
Zhao, Z Y; You, W Y and Zuo, J (2010) Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. Journal of Construction Engineering and Management, 136(9), pp. 1056-1060. ISSN 0733-9364
Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2004) Applying a genetic algorithm-based multiobjective approach for time-cost optimization. Journal of Construction Engineering and Management, 130(2), pp. 168-176. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(1), pp. 81-91. ISSN 0733-9364
Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364
Zheng, X; Li, R; Han, Y; Xue, R and Bai, J (2023) The dilemma of operator selection in urban rail transit PPP project operations: A LASSO approach. Journal of Construction Engineering and Management, 149(7): 05023007, ISSN 0733-9364
Zhong, B; Shen, L; Pan, X; Zhong, X and He, W (2024) Dispute classification and analysis: Deep learning-based text mining for construction contract management. Journal of Construction Engineering and Management, 150(1): 04023151, ISSN 0733-9364
Zhong, D H and Zhang, J S (2003) New method for calculating path float in program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 129(5), pp. 501-506. ISSN 0733-9364
Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.
Zhong, Z and Gou, Z (2023) High-rise apartment quality evaluation and related demographic factors: Lesson from rentsafeto programme. Building Research & Information, 51(4), pp. 430-445. ISSN 0961-3218
Zhou, C; Li, R; Xiong, X; Li, J and Gao, Y (2023) Optimization of triage time and sample delivery path in health infrastructure to combat COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3620-3644. ISSN 0969-9988
Zhou, H W; Zhou, Y H and Zhao, C J (2016) Fault-response mechanism of production system in concrete-dam-construction simulation. Journal of Construction Engineering and Management, 142(11): 04016065, ISSN 0733-9364
Zhou, S and Gheisari, M (2018) Unmanned aerial system applications in construction: a systematic review. Construction Innovation, 18(4), pp. 453-468. ISSN 1471-4175
Zhou, T; Zhu, Q; Shi, Y and Du, J (2022) Construction robot teleoperation safeguard based on real-time human hand motion prediction. Journal of Construction Engineering and Management, 148(7): 04022040, ISSN 0733-9364
Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.
Zhou, W (2023) Condition state-based decision making in evolving systems: Applications in asset management and delivery. PhD thesis, George Mason University, USA.
Zhou, Xiaoyan (2023) A reinforcement learning neural network approach to online optimization of construction manufacturing processes. PhD thesis, University of Florida, USA.
Zhu, H; Hwang, B G; Ngo, J and Tan, J P S (2022) Applications of smart technologies in construction project management. Journal of Construction Engineering and Management, 148(4): 04022010, ISSN 0733-9364
Zhu, J; Zhang, C; Yuan, J; Pan, W; Xue, J and Lou, F (2025) An improved model for precast component transportation scheduling under dynamic traffic and weather conditions. Journal of Construction Engineering and Management, 151(11): 04025181, ISSN 0733-9364
Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.
Zhu, L and Cheung, S O (2021) Toward an equity-based analysis of construction incentivization. Journal of Construction Engineering and Management, 147(11): 04021148, ISSN 0733-9364
Zhu, X (2023) Machine learning supported multiple criteria decision making for project delivery system selection. PhD thesis, Queen's University Belfast, UK.
Ziadat, W (2018) A meta-analysis study of project and programme management complexity in the oil and gas sector of the Middle East and North Africa region. PhD thesis, University of Manchester, UK.
Zin Zawawi, M I (2017) Improving competition within public private partnership procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.
Zohrehvandi, S. (2026) A sustainable project scheduling algorithm in construction; an approach to using project buffer management techniques. International Journal of Construction Education and Research, 22(2), pp. 331-359. ISSN 1557-8771
Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(6), pp. 1129-1150. ISSN 0969-9988
Zohrehvandi, S; Khalilzadeh, M; Amiri, M and Shadrokh, S (2022) Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. Engineering, Construction and Architectural Management, 29(2), pp. 716-738. ISSN 0969-9988
Zohrehvandi, S; Vanhoucke, M; Khalilzadeh, M; Amiri, M and Shadrokh, S (2023) A fuzzy project buffer management algorithm: A case study in the construction of a renewable project. International Journal of Construction Management, 23(12), pp. 2134-2143. ISSN 1562-3599
Zohrehvandi, S; Vanhoucke, M; Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(2), pp. 502-524. ISSN 0969-9988
Zoleykani, M. J. and Abbasianjahromi, H. (2026) Integrating ar and 4D-BIM for dynamic hazard management in construction projects. International Journal of Construction Management, 26(7), pp. 1239-1263. ISSN 1562-3599
Zolfagharian, S; Irizarry, J; Ressang, A; Nourbakhsh, M and Gheisari, M (2014) Automated safety planning approach for residential construction sites in Malaysia. International Journal of Construction Management, 14(3), pp. 134-147. ISSN 1562-3599
Zolghadr, Ali (2023) Innovative offsite construction uptake in the housebuilding sector: A systemic approach to economic justifiability for volume builders. PhD thesis, RMIT University, Australia.
Zou, H and Zhou, G (2024) Multimode variable resource-constrained time/cost trade-off problem in repetitive projects with adjustment strategy. International Journal of Construction Management, 24(12), pp. 1271-1281. ISSN 1562-3599
Zou, P X W; Shi, V Y and Li, Z (2010) An econometric evaluation framework for investment in construction safety. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Zou, X and Rong, Z (2025) Resource-constrained repetitive project scheduling with soft logic. Engineering, Construction and Architectural Management, 32(4), pp. 2397-2429. ISSN 0969-9988
Zou, X; Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(6), pp. 1713-1738. ISSN 0969-9988
Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988
Zou, Y; Kiviniemi, A and Jones, S W (2016) Developing a tailored rbs linking to BIM for risk management of bridge projects. Engineering, Construction and Architectural Management, 23(6), pp. 727-750. ISSN 0969-9988
Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.
Zouein, P P and Tommelein, I D (1999) Dynamic layout planning using a hybrid incremental solution method. Journal of Construction Engineering and Management, 125(6), pp. 400-408. ISSN 0733-9364
Zouein, P P and Tommelein, I D (2001) Improvement algorithm for limited space scheduling. Journal of Construction Engineering and Management, 127(2), pp. 116-124. ISSN 0733-9364
Zu, L and Liao, W (2025) Reinforcement learning-based multiobjective and multiconstraint production scheduling for precast concrete. Journal of Construction Engineering and Management, 151(8): 04025089, ISSN 0733-9364
Zubairu, M (1990) Sites and services housing development: Strategies for improving the effective demand for projects by low-income families in the urban areas of Nigeria. PhD thesis, University of Strathclyde, UK.
Zubairu, S N (1998) Maintenance of government office buildings in Nigeria: A post-occupancy evaluation approach. PhD thesis, University of Lagos, Nigeria.
Zulu, S and Muleya, F (2019) A student perspective of ethics in the Zambian construction industry. Journal of Engineering, Design and Technology, 17(2), pp. 266-282. ISSN 1726-0531
Zuluaga, C M; Albert, A and Winkel, M A (2020) Improving safety, efficiency, and productivity: Evaluation of fall protection systems for bridge work using wearable technology and utility analysis. Journal of Construction Engineering and Management, 146(2): 04019107, ISSN 0733-9364
Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology. PhD thesis, North Carolina State University, USA.
Zuo, F; Zio, E and Yuan, Y (2022) Risk-response strategy optimization considering limited risk-related resource allocation and scheduling. Journal of Construction Engineering and Management, 148(11): 04022123, ISSN 0733-9364
Zwikael, O (2009) Critical planning processes in construction projects. Construction Innovation, 9(4), pp. 372-387. ISSN 1471-4175
Zwikael, O; Salmona, M; Meredith, J and Zarghami, S A (2023) Enhancing project stakeholder communication under insufficient knowledge of project management concepts. Engineering, Construction and Architectural Management, 30(10), pp. 5007-5029. ISSN 0969-9988
af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
al-Attar, H; Sweis, G; Tarawneh, B; Abu-Khader, W; Haddad, L and Sweis, R (2025) Enhanced construction project duration estimation using artificial neural networks: Initial design and planning stages. Construction Economics and Building, 25(2), pp. 168-191. ISSN 2204-9029
d'Apolito, L and Hong, H (2020) Forklift truck performance simulation and fuel consumption estimation. Journal of Engineering, Design and Technology, 18(3), pp. 689-703. ISSN 1726-0531
de Feijter, F J (2023) Trust in circular design: Active stakeholder participation in Chinese and Dutch housing retrofit projects. Building Research & Information, 51(1), pp. 105-118. ISSN 0961-3218
de Magalhães, F M R L (2010) Operational modal analysis for testing and monitoring of bridges and special structures. PhD thesis, Universidade do Porto, Portugal.
de Silva, C (2012) Health and safety: Teaching law, educating for prevention. International Journal of Law in the Built Environment, 4(3), pp. 233-246. ISSN 17561469
de Solminihac Tampier, H E (1992) System analysis for expediting urban highway construction. PhD thesis, University of Texas at Austin, USA.
ke, Y; Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(1), pp. 6-25. ISSN 1366-4387
ng, S T; Skitmore, M; Deng, M Z M and Nadeem, A (2004) Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation, 4(1), pp. 3-17. ISSN 1471-4175
olde Scholtenhuis L L, D A G (2013) Welcoming high reliability organising in construction management. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
van Heerden, H H G (2018) The road to purpose-fit selection of the construction manager. PhD thesis, University of Pretoria, South Africa.
van Niekerk, J; Wium, J and de Koker, N (2022) The value of data from construction project site meeting minutes in predicting project duration. Built Environment Project and Asset Management, 12(5), pp. 738-753. ISSN 2044-124X
van Rij, E and Altes, W K K (2014) Integrated air quality and land use planning in The Netherlands. International Journal of Law in the Built Environment, 6(1-2), pp. 194-210. ISSN 1756-1450
van der Kuil, P A v d (2023) Investorenarchitektur. The planning, organisation and control of architectural quality in commercial real estate. PhD thesis, Technische Universitaet Berlin, Germany.
van der Kuyp, D J (2018) Strategies construction managerial leaders use to counteract material cost overruns. PhD thesis, Walden University, USA.
zhao, X. and lu, R. (2025) Dynamic scheduling optimization model and algorithm for linear projects considering local rescheduling. Engineering, Construction and Architectural Management, 33(5), pp. 4019-4045. ISSN 0969-9988
Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364
Ökmen, Ö and Öztaş, A (2008) Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), pp. 49-63. ISSN 0733-9364
Ürge-Vorsatz, D; Koeppel, S and Mirasgedis, S (2007) Appraisal of policy instruments for reducing buildings' CO2 emissions. Building Research & Information, 35(4), pp. 458-477. ISSN 0961-3218
Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.