Items with Topic: Supply Chain Management

Number of items: 1533.

Abadi, M; Huang, J; Yeow, J; Mohandes, S R and Zhang, L (2025) Towards a complex push-to-pull dynamics in circular construction supply chains: A systematic literature review. Engineering, Construction and Architectural Management, 32(2), pp. 912-938. ISSN 0969-9988

Abas, M; Khattak, S B; Habib, T and Nadir, U (2022) Assessment of critical risk and success factors in construction supply chain: A case of Pakistan. International Journal of Construction Management, 22(12), pp. 2258-2266. ISSN 1562-3599

Abbasi, S; Taghizade, K and Noorzai, E (2020) BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints. Journal of Construction Engineering and Management, 146(12): 04020143, ISSN 0733-9364

Abdelghani, Mohammad (2021) Towards a generalized value stream mapping and domain ontology to support the enabling of industry 4.0 in construction. PhD thesis, University of Alberta, Canada.

Abdelshafy, A and Walther, G (2023) Using dynamic-locational material flow analysis to model the development of urban stock. Building Research & Information, 51(1), pp. 5-20. ISSN 0961-3218

Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029

Abdul-Aziz, A R (2001) Foreign workers and labour segmentation in Malaysia's construction industry. Construction Management and Economics, 19(8), pp. 789-798. ISSN 01446193

Abhulimen, P E (2024) The influence of information-sharing and trust on competitiveness and organizational performance in construction supply chain management. DBA thesis, Keiser University, USA.

Abiodun, O; Abadi, M; Ejohwomu, O and Manu, P (2024) Dimensions of maturity model for institutionalising smart circular construction: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Abreu, M M and Lordsleem, A C (2019) Aluminum formwork system: Loss and productivity. Built Environment Project and Asset Management, 9(5), pp. 616-627. ISSN 2044-124X

Abu Dabous, S; Alzghoul, A and Ibrahim, F (2025) Intelligent condition prediction model for bridge infrastructure based on evaluating machine learning algorithms. Smart and Sustainable Built Environment, 14(2), pp. 557-576. ISSN 2046-6099

Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364

Abuzeinab, A; Arif, M; Kulonda, D J and Awuzie, B O (2016) Green business models transformation: Evidence from the UK construction sector. Built Environment Project and Asset Management, 6(5), pp. 478-490. ISSN 2044-124X

Adabre, M A; Chan, A P C; Darko, A and Hosseini, M R (2023) Facilitating a transition to a circular economy in construction projects: Intermediate theoretical models based on the theory of planned behaviour. Building Research & Information, 51(1), pp. 85-104. ISSN 0961-3218

Adah, C A and Ekweani, C P (2025) Career choice of graduating students in built environment courses in Nigeria: A mixed-method study. International Journal of Construction Education and Research, 21(1), pp. 117-138. ISSN 1557-8771

Addy, M N; Akunyumu, S and Simons, B (2019) Key risk factors affecting renewable energy independent power producer (IPP) set-up projects in developing countries: The case of Ghana. Journal of Engineering, Design and Technology, 17(6), pp. 1340-1355. ISSN 1726-0531

Adediran, A (2018) Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa. PhD thesis, University of Cape Town, South Africa.

Adekunle, O O (2019) A linear programming-based optimization model to address skilled labor shortages through strategic investments in the construction industry. DEng thesis, Morgan State University, USA.

Adekunle, S A; Aigbavboa, C O and Ejohwomu, O A (2022) Understanding the BIM actor role: A study of employer and employee preference and availability in the construction industry. Engineering, Construction and Architectural Management, 31(13), pp. 160-180. ISSN 0969-9988

Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2025) An analytical approach to understanding construction cost overruns during COVID-19. Smart and Sustainable Built Environment, 14(6), pp. 1780-1794. ISSN 2046-6099

Adepu, N (2023) Analysis of the impact of COVID-19 on construction cost and schedule overruns. PhD thesis, University of Texas at Arlington, USA.

Adham, A (2018) The political economy of work in Saudi Arabia: a comparative labour process analysis in two firms. PhD thesis, De Montfort University, UK.

Adinyira, E; Agyekum, K; Danku, J C; Addison, P and Kukah, A S (2020) Influence of subcontractor risk management on quality performance of building construction projects in Ghana. Journal of Construction in Developing Countries, 25(2), pp. 175-197. ISSN 1823-6499

Aduwo, E B; Ibem, E O; Afolabi, A O; Oluwnmi, A O; Tunji-Olayeni, P F; Ayo-Vaughan, E A; Uwakonye, U O and Oni, A A (2020) Exploring anti-corruption capabilities of e-procurement in construction project delivery in Nigeria. Construction Economics and Building, 20(1), pp. 56-76. ISSN 2204-9029

Afful, A E; Wang, C C; Sunindijo, R Y; Frimpong, S; Boadu, E and Baah, B (2025) Evolving job roles of women in the construction industry. Journal of Construction Engineering and Management, 151(3): 03125001, ISSN 0733-9364

Agapiou, A (1996) Forecasting the supply of construction labour. PhD thesis, Loughborough University, UK.

Agapiou, A and Dainty, A R J (2003) Client-led approaches to increasing participation of women, ethnic minorities and disabled people in the construction workforce: A framework for change. Journal of Construction Procurement, 9(2), pp. 4-16. ISSN 1358-9180

Agapiou, A; Flanagan, R; Norman, G and Notman, D (1998) The changing role of builders merchants in the construction supply chain. Construction Management and Economics, 16(3), pp. 351-361. ISSN 01446193

Agdas, D (2008) Corporate-level management system for critical strategic resources for large construction program managers. PhD thesis, University of Florida, USA.

Agyekum-Mensah, G and Knight, A D (2017) The professionals' perspective on the causes of project delay in the construction industry. Engineering, Construction and Architectural Management, 24(5), pp. 828-841. ISSN 0969-9988

Ahlstrand, R (2022) Structures of subcontracting: Work organisation, control, and labour in the Swedish building sector. PhD thesis, Lund University, Sweden.

Ahmad, S; Soetanto, R and Goodier, C (2019) Lean approach in precast concrete component production. Built Environment Project and Asset Management, 9(3), pp. 457-470. ISSN 2044-124X

Ahmadi, Ehsan (2025) Memory-augmented llm agent for predicting locomotion modes in construction activities. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.

Ahmed, W; Najmi, A; Arif, M and Younus, M (2019) Exploring firm performance by institutional pressures driven green supply chain management practices. Smart and Sustainable Built Environment, 8(5), pp. 415-437. ISSN 2046-6099

Ahn, Sang Jun (2019) Transportation framework in panelized construction for residential building. PhD thesis, University of Alberta, Canada.

Aitken, A and Paton, R A (2016) The 'transaction X-ray': Understanding construction Procurement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 115-123. ISSN 17514304

Ajayi, S; Brinklow-Harris, J; Alaka, H A and Dauda, J A (2019) Managing the benefits and impediments to offsite construction in the UK construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.

Akindele, M A (2024) Development and evaluation of portable reduced-complexity air quality models for policy assessment in Africa. PhD thesis, Carnegie Mellon University, USA.

Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(2), pp. 105-113. ISSN 01446193

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2000) Management of risks within the PFI project environment. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Akintoye, A and Chinyio, E (2005) Private finance initiative in the healthcare sector: Trends and risk assessment. Engineering, Construction and Architectural Management, 12(6), pp. 601-616. ISSN 0969-9988

Akinwale, A A and Olusanya, O A (2020) Influence of subcontracting processes on wages and workloads in the building construction industry in Nigeria. Journal of Construction Business and Management, 4(2), pp. 1-10. ISSN 2521-0165

Akmam Syed Zakaria, S and Amtered El-Abidi, K M (2021) Economic effects of migrant labor on industrialized building system (IBS) adoption in the Malaysian construction industry. Architectural Engineering and Design Management, 17(1-2), pp. 50-66. ISSN 1745-2007

Al Yami, H M A (2017) Decision making analysis for an integrated risk management framework of maritime container port infrastructure and transportation systems. PhD thesis, Liverpool John Moores University, UK.

Al-Ajam, M (2008) Integrating collaborative extranets with project integrated databases to improve the construction tender stage. PhD thesis, University of Salford, UK.

Al-Bayati, A J and Al-Zubaidi, H A (2018) Inventory of nanomaterials in construction products for safety and health. Journal of Construction Engineering and Management, 144(9): 06018004, ISSN 0733-9364

Al-Bizri, S and Gray, C (2010) Management framework for technology clusters implementation. Construction Management and Economics, 28(7), pp. 771-782. ISSN 1466433X

Al-Hajj, A and Hamani, K (2011) Material waste in the UAE construction industry: Main causes and minimization practices. Architectural Engineering and Design Management, 7(4), pp. 221-235. ISSN 1745-2007

Al-Hinai, A (2024) A hermeneutical approach to social value: A case study of national infrastructure planning in Oman. PhD thesis, University of Manchester, UK.

Al-Jarallah, M I (1983) Construction industry in Saudi Arabia. Journal of Construction Engineering and Management, 109(4), pp. 355-368. ISSN 0733-9364

Al-Kayed, A. A.; Rotimi, F. E.; Purushothaman, M. B.; Pawley, M. and Ghaffarian Hoseini, A. (2026) Modelling the enablers of effective digital technology implementation for competitiveness enhancement among subcontracting organisations in new zealand's residential construction industry. Journal of Engineering, Design and Technology, 24(4), pp. 894-919. ISSN 1726-0531

Al-Saeed, Y; Edwards, D J and Scaysbrook, S (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK. Construction Innovation, 20(3), pp. 345-377. ISSN 1471-4175

Al-Saeed, Y; Parn, E; Edwards, D J and Scaysbrook, S (2019) A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production: A case study. Journal of Engineering, Design and Technology, 17(5), pp. 960-984. ISSN 1726-0531

Al-Wazeer, A A-R (2007) Risk-based bridge maintenance strategies. PhD thesis, University of Maryland, College Park, USA.

Al-Werikat, G K E (2017) The impact of supply chain management on construction projects performance in Jordan. PhD thesis, Coventry University, UK.

AlMaian, R Y; Needy, K L; Walsh, K D and Alves, T D C L (2016) A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects. Journal of Construction Engineering and Management, 142(2): 04015061, ISSN 0733-9364

AlTalhoni, A; Alwashah, Z; Liu, H; Abudayyeh, O; Kwigizile, V and Kirkpatrick, K (2026) Data-driven identification of key pricing factors in highway construction cost estimation during economic volatility. International Journal of Construction Management, 26(1), pp. 152-167. ISSN 1562-3599

Alajmi, A M R F (2009) The delivery of value for money in public sector projects in Qatar. PhD thesis, University of Leeds, UK.

Alanjari, P; Razavialavi, S and AbouRizk, S (2015) Hybrid genetic algorithm-simulation optimization method for proactively planning layout of material yard laydown. Journal of Construction Engineering and Management, 141(10): 06015001, ISSN 0733-9364

Alazzaz, F and Whyte, A (2015) Linking employee empowerment with productivity in off-site construction. Engineering, Construction and Architectural Management, 22(1), pp. 21-37. ISSN 0969-9988

Albalawi, R K (2023) Comprehensive analysis of the multiskilling strategy among craft professionals in the construction industry. PhD thesis, University of Colorado at Boulder, USA.

Aldridge, G; Pasquire, C; Gibb, A and Blismas, N G (2001) Methods for measuring the "unmeasurable": Evaluating the benefits of pre-assembly and standardization in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Alhabashi, M H (1991) Material management in the United States construction industry. DSc thesis, George Washington University, USA.

Alhawamdeh, M and Lee, A (2025) A systematic review and meta-synthesis of the barriers of offsite construction projects. International Journal of Construction Management, 25(9), pp. 1087-1099. ISSN 1562-3599

Aliu, J; Aghimien, D; Aigbavboa, C; Oke, A; Ebekozien, A and Temidayo, O (2023) Empirical investigation of discipline-specific skills required for the employability of built environment graduates. International Journal of Construction Education and Research, 19(4), pp. 460-479. ISSN 1557-8771

Aliu, J and Aigbavboa, C (2023) Key generic skills for employability of built environment graduates. International Journal of Construction Management, 23(3), pp. 542-552. ISSN 1562-3599

Aliyu, A A (2014) Product stewardship as a novel sustainability pathway for the UK precast concrete industry. PhD thesis, Loughborough University, UK.

Alkass, S; Arouian, A and Moselhi, O (1993) Computer-aided equipment selection for transporting and placing concrete. Journal of Construction Engineering and Management, 119(3), pp. 445-465. ISSN 0733-9364

Alkass, S and Harris, F (1988) Expert system for earthmoving equipment selection in road construction. Journal of Construction Engineering and Management, 114(3), pp. 426-440. ISSN 0733-9364

Alkass, S T (1988) An expert system applied to earthmoving operations and equipment selection. PhD thesis, Loughborough University, UK.

Alkilani, S and Loosemore, M (2024) An investigation of how stakeholders influence construction project performance: A small and medium sized contractor's perspective in the Jordanian construction industry. Engineering, Construction and Architectural Management, 31(3), pp. 1272-1297. ISSN 0969-9988

Almazkoor, F B (2014) Two-stage methodology for managing and controlling material flow between multiple construction projects. PhD thesis, Clemson University, USA.

Almeida, Rafael Goffinet de (2023) Spatialities of participation: Agencies between culture, politics and neoliberal subjectvation. PhD thesis, Universidade de São Paulo, Brazil.

Almughrabi, F M; Samarasinghe, D A S and Rotimi, F E (2021) Analysis of skill shortages in prefabricated residential construction: A case for New Zealand. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Almutairi, A M S (2017) Protecting the rights of temporary foreign 'low-skilled' workers in the Saudi construction industry: a case for legal reform. PhD thesis, Brunel University, UK.

Aloini, D; Dulmin, R; Mininno, V and Ponticelli, S (2012) A conceptual model for construction supply chain management implementation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Alqasmi, Khalaf (2019) An investigation of unethical practices in the Saudi Arabian construction industry. PhD thesis, RMIT University, Australia.

Alshahrani, A Y (2020) Interpretive investigation into the implementation of sustainable business models within Saudi housing construction industry. PhD thesis, University of Salford, UK.

Alshboul, O.; Al-Shboul, K.; Shehadeh, A. and Tatari, O. (2026) Advancing equipment management for construction: Introducing a new model for cost, time and quality optimization. Construction Innovation, 26(4), pp. 1191-1217. ISSN 1471-4175

Alshboul, O (2019) Multi-objective optimization for heavy earthmoving construction equipment management based on time, cost, and pollutant emissions. PhD thesis, University of Central Florida, USA.

Alumbugu, P O (2019) Construction material logistics management: the case of north-central Nigeria. PhD thesis, Nelson Mandela University, South Africa.

Alyousif, A T (2010) The influence of national culture on the management practices of construction companies in the United Arab Emirates. PhD thesis, London South Bank University, UK.

Alzoubi, Y; Locatelli, G and Sainati, T (2024) Turning a blind eye: Ignoring modern slavery in the race to construction project completion. Journal of Construction Engineering and Management, 150(10): 04024136, ISSN 0733-9364

Amade, B; Ogbonna, A C and Nkeleme, E I (2022) An investigation of the factors affecting successful enterprise resource planning (ERP) implementation in Nigeria. Journal of Construction in Developing Countries, 27(1), pp. 41-63. ISSN 1823-6499

Ambekar, S; Roy, D; Hiray, A; Prakash, A and Patyal, V S (2022) Barriers to adoption of reverse logistics: A case of construction, real estate, infrastructure and project (crip) sectors. Engineering, Construction and Architectural Management, 29(7), pp. 2878-2902. ISSN 0969-9988

Amewornu, E M and Nwulu, N I (2021) A framework for the techno-economic and reliability analysis of grid connected microgrids. Journal of Engineering, Design and Technology, 19(3), pp. 659-685. ISSN 1726-0531

Amirkhanian, S N and Baker, N J (1992) Expert system for equipment selection for earth-moving operations. Journal of Construction Engineering and Management, 118(2), pp. 318-331. ISSN 0733-9364

Amunzu, I C (2020) A qualitative case study of construction managers’ understanding of lean thinking. PhD thesis, Grand Canyon University, USA.

An, T and Watanabe, T (2011) Towards the sustainable improvement in construction labour's employment in China: Cultivating subcontractor's role. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Anderson, B and James, P (2021) Covid-19 lockdown: Impacts on gb electricity demand and CO2 emissions. Buildings & Cities, 2(1), pp. 134-149. ISSN 2632-6655

Anikeeff, M A and Sriram, V (2008) Construction management strategy and developer performance. Engineering, Construction and Architectural Management, 15(6), pp. 504-513. ISSN 0969-9988

Annor, John (2025) Building pathways to the future: Leveraging collaborative instruction platforms to address global and regional challenges in construction workforce education. PhD thesis, University of Wyoming, USA.

Anson, M; Ying, K C T and Siu, M F F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(8), pp. 1672-1695. ISSN 0969-9988

Antai, I; Lenka, S and Achtenhagen, L (2025) Digital platforms and the construction supply chain: Trends and emerging themes in extant AEC research. Construction Management and Economics, 43(2), pp. 113-129. ISSN 0144-6193

Anumba, C (2006) Application of GIS to labour market planning in construction. EngD thesis, Loughborough University, UK.

Anumba, C; Dainty, A R J; Ison, S G and Sergeant, A (2005) The application of GIS to construction labour market planning. Construction Innovation, 5(4), pp. 219-230. ISSN 1471-4175

Anumba, C E H; Dainty, A; Ison, S and Sergeant, A (2006) Understanding structural and cultural impediments to ICT system integration: A GIS-based case study. Engineering, Construction and Architectural Management, 13(6), pp. 616-633. ISSN 0969-9988

Anwar, Waqas (2019) Development of multiple linear regression model and rule based decision support system to improve supply chain management of road construction projects in disaster regions. PhD thesis, University of Bradford, UK.

Anwer, S; Li, H; Antwi-Afari, M F; Umer, W; Mehmood, I and Wong, A Y L (2022) Effects of load carrying techniques on gait parameters, dynamic balance, and physiological parameters during a manual material handling task. Engineering, Construction and Architectural Management, 29(9), pp. 3415-3438. ISSN 0969-9988

Arai, K and Morimoto, E (2020) Renovation of the Japanese construction industry: Evaluation of i-Construction from the perspective of construction management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Aramvareekul, P (2003) An analysis of labor productivity in the United States construction industry. PhD thesis, State University of New York at Buffalo, USA.

Arashpour, M; Wakefield, R; Abbasi, B; Arashpour, M and Hosseini, R (2018) Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. Architectural Engineering and Design Management, 14(1-2), pp. 46-59. ISSN 1745-2007

Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2013) A new approach for modelling variability in residential construction projects. Construction Economics and Building, 13(2), pp. 83-92. ISSN 2204-9029

Araujo, Bruno César Pino Oliveira de (2016) Occupational trajectories of young engineers in Brazil. PhD thesis, Universidade de São Paulo, Brazil.

Arbulu, R J; Tommelein, I D; Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(2), pp. 161-171. ISSN 0961-3218

Ardeshiri, A; Vij, A and Arthur, N (2026) Attracting young women to construction careers: A preference study to inform workforce strategies. Construction Management and Economics, 44(3), pp. 214-239. ISSN 0144-6193

Arditi, D and Chotibhongs, R (2005) Issues in subcontracting practice. Journal of Construction Engineering and Management, 131(8), pp. 866-876. ISSN 0733-9364

Arkani, S (1999) Contractual interfaces: the implications of building production process management and interorganisational relations for productivity in building project coalitions. PhD thesis, University of Greenwich, UK.

Arneson, E (2018) Construction capacity: How regional construction supply chains respond to disruptions. PhD thesis, University of Colorado at Boulder, USA.

Asadollahfardi, G; Katebi, A; Taherian, P and Panahandeh, A (2021) Environmental life cycle assessment of concrete with different mixed designs. International Journal of Construction Management, 21(7), pp. 665-676. ISSN 1562-3599

Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.

Ashkanani, S (2023) Project management of large and complex-projects: The case of “lng megaprojects in the state of Qatar”. PhD thesis, Hamad Bin Khalifa University, Qatar.

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran. PhD thesis, Nottingham Trent University, UK.

Assaad, R A (1991) Structured labor markets: The case of the construction sector in Egypt. PhD thesis, Cornell University, USA.

Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599

Atiq Ur Rehman, M.; Khan, S. A. and Chaabane, A. (2026) An integrated decision support model for early planning in off-site construction projects. Journal of Construction Engineering and Management, 152(9): 04026142, ISSN 0733-9364

Attarzadeh, M (2014) Negotiation-based risk management for PPP-BOT infrastructure projects. PhD thesis, National University of Singapore, Singapore.

Attarzadeh, M; Nath, T and Tiong, R L K (2015) Identifying key factors for building information modelling adoption in Singapore. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 220-231. ISSN 17514304

Atuahene, B T; Kanjanabootra, S and Gajendran, T (2022) Preliminary benefits of big data in the construction industry: a case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(2), pp. 67-77. ISSN 17514304

Aulich, H T (2013) The role of effective communication in the construction industry: A guide for education and health clients. Construction Economics and Building, 13(4), pp. 92-101. ISSN 2204-9029

Austrin, T B (1978) Industrial relations in the construction industry: Some sociological considerations on wage contracts and trade unionism (1919-1973). PhD thesis, University of Bristol, UK.

Avila, J; Rapp, R; Dunbar, S and Jackson, A T (2021) Burnout and worklife in disaster restoration: Maslach burnout inventory and areas of worklife survey. Journal of Construction Engineering and Management, 147(2): 04020171, ISSN 0733-9364

Awe, E M; Stephenson, P and Griffith, A (2009) An assessment of education and training needs of skilled operatives within the Nigerian construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Azambuja, M M; Ponticelli, S and O'Brien, W J (2014) Strategic procurement practices for the industrial supply chain. Journal of Construction Engineering and Management, 140(7): 06014005, ISSN 0733-9364

Azeez, M; Gambatese, J and Hernandez, S (2019) What do construction workers really want? A study about representation, importance, and perception of US construction occupational rewards. Journal of Construction Engineering and Management, 145(7): 04019040, ISSN 0733-9364

Badi, S (2024) The role of blockchain in enabling inter-organisational supply chain alignment for value co-creation in the construction industry. Construction Management and Economics, 42(3), pp. 266-288. ISSN 01446193

Badra, N; Hegazy, H; Zhang, J; Yahia, M; Fathy, M and AboulHaggag, S (2025) Application of fuzzy multi-objective model for crashing the construction of steel structure projects post-pandemic (Covid-19). International Journal of Construction Management, 25(3), pp. 363-374. ISSN 1562-3599

Baiden, B K; Price, A D F and Dainty, A R J (2003) Looking beyond processes: Human factors in team integration. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Baienat, S. and Iordanova, I. (2026) Quantifying building adaptability and circular performance through BIM: The adaptation intensity index (AII), circular adaptability performance (CAP), and digital adaptability passport (DAP). Smart and Sustainable Built Environment, pp. 1-22. ISSN 2046-6099

Bajar, K; Kamat, A; Shanker, S and Barve, A (2024) Blockchain technology: A catalyst for reverse logistics of the automobile industry. Smart and Sustainable Built Environment, 13(1), pp. 133-178. ISSN 2046-6099

Bajjou, M S and Chafi, A (2020) Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management, 20(7), pp. 783-800. ISSN 1562-3599

Baker, L M (1984) A labor market model to manage costs risk in construction project management. PhD thesis, Colorado School of Mines, USA.

Balasubramanian, S (2017) Green supply chain management: an investigation on the construction sector. PhD thesis, Middlesex University, UK.

Balasubramanian, V and Prasad, G S (2007) Manual bar bending-an occupational hazard for construction workers in developing nations. Journal of Construction Engineering and Management, 133(10), pp. 791-797. ISSN 0733-9364

Balderston, F E (1953) Scale, vertical integration and costs in residential construction firms. PhD thesis, Princeton University, USA.

Ballard, G; Harper, N and Zabelle, T (2003) Learning to see work flow: An application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), pp. 6-14. ISSN 0969-9988

Balogun, T B (2014) Towards a life cycle framework for bridge management systems in the UK: Insights from a critical review of international approaches and models. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Balouktsi, M (2020) Carbon metrics for cities: Production and consumption implications for policies. Buildings & Cities, 1(1), pp. 233-259. ISSN 2632-6655

Bamana, F; Lehoux, N and Cloutier, C (2019) Simulation of a construction project: Assessing impact of just-in-time and lean principles. Journal of Construction Engineering and Management, 145(5): 05019005, ISSN 0733-9364

Bamgbade, J A; Hosany, M M; Ajibike, W A and Chai, C S (2024) Green supply chain nuances in East Malaysian construction industry. International Journal of Construction Management, 24(5), pp. 477-485. ISSN 1562-3599

Barontini, A (2021) Bio-inspired algorithms for structural health monitoring of civil engineering systems. PhD thesis, Universidade do Minho, Portugal.

Barros, Natalia Nakamura (2024) Integrative model of life cycle assessment with internet of things, BIM and machine learning. PhD thesis, Universidade Estadual de Campinas, Brazil.

Barroso-Aguilar, L F (1973) An integrated modeling methodology for project-site management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Basha, M (2021) Intra-sector firm performance and its determinants in the UK construction industry. PhD thesis, University of Westminster, UK.

Basma Ben, M; Lehoux, N and Blanchet, P (2024) Integration mechanisms for material suppliers in the construction supply chain: A systematic literature review. Construction Management and Economics, 42(1), pp. 70-107. ISSN 01446193

Bastos, R. A.; Pierott, R. M. R.; Navarro, L. L. L.; Tam, V. W. Y.; Najjar, M. K. and Haddad, A. N. (2026) Comparative analysis of communication in project management approaches: Waterfall, agile, and hybrid. International Journal of Construction Management, 26(10), pp. 2176-2204. ISSN 1562-3599

Bataglin, Fernanda Saidelles (2023) Prescriptive conceptual framework for planning and controlling engineer-to-order industrialized building systems. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Bayat, M; Khanzadi, M and Nasirzadeh, F (2020) Bargaining game model to determine concessionary items in build-operate-transfer contracts. Journal of Construction Engineering and Management, 146(2): 04019109, ISSN 0733-9364

Bayat, M; Khanzadi, M; Nasirzadeh, F and Chavoshian, A (2020) Financial conflict resolution model in BOT contracts using bargaining game theory. Construction Innovation, 20(1), pp. 18-42. ISSN 1471-4175

Beaney, W D (2006) An examination of sectoral mobility in the UK labour force. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Beaney, W D (2007) A principal components analysis of labour sectoral transfers. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Beard, J L (2011) Theoretical framework for determinants of A/E/C firm value, strategy and continuity: An analysis incorporating corporeal, volitional and knowledge assets. PhD thesis, Georgia Institute of Technology, USA.

Behrens, M (2002) Learning from the enemy? Internal union restructuring and the imitation of management strategies. PhD thesis, Cornell University, USA.

Beliveau, Y; Dixit, S and Dal, T (1993) Dynamic damping of payload motion for cranes. Journal of Construction Engineering and Management, 119(3), pp. 631-644. ISSN 0733-9364

Beliveau, Y J; Dixit, S S; Dal, T and Morad, A A (1993) Multitask motion planning for material handling in construction. Journal of Construction Engineering and Management, 119(1), pp. 180-191. ISSN 0733-9364

Bell, L C and McCullouch, B G (1988) Bar code applications in construction. Journal of Construction Engineering and Management, 114(2), pp. 263-278. ISSN 0733-9364

Bengtsson, S H (2017) Innovation in the construction industry: Factors, actors and the client's role. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193

Bennett, J (1993) Japan's building industry: The new model. Construction Management and Economics, 11(1), pp. 3-17. ISSN 01446193

Berg, J B; Thuesen, C; Ernstsen, S K and Jensen, P A (2021) Reconfiguring the construction value chain: Analysing key sources of friction in the business model archetypes of AEC companies in strategic partnerships. Construction Management and Economics, 39(6), pp. 533-548. ISSN 01446193

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings. PhD thesis, George Washington University, USA.

Besklubova, S; Zhong, R Y and Tan, B Q (2025) An integrated model of a prefabrication hub feasibility assessment: A Hong Kong case. International Journal of Construction Management, 25(11), pp. 1300-1312. ISSN 1562-3599

Bhattacharya, S and Momaya, K S (2021) Actionable strategy framework for digital transformation in AECO industry. Engineering, Construction and Architectural Management, 28(5), pp. 1397-1422. ISSN 0969-9988

Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364

Bilec, M M (2007) A hybrid life cycle assessment model for construction processes. PhD thesis, University of Pittsburgh, USA.

Bilec, Melissa M (2007) A hybrid life cycle assessment model for construction processess. PhD thesis, University of Pittsburgh, USA.

Bing, L and Tiong, R L K (1999) Risk management model for international construction joint ventures. Journal of Construction Engineering and Management, 125(5), pp. 377-384. ISSN 0733-9364

Bingol, B N; Arditi, D and Polat, G (2024) A performance-based subcontractor selection model. Journal of Construction Engineering and Management, 150(8): 04024079, ISSN 0733-9364

Bingol, B N and Polat, G (2015) Time-cost-quality trade-off model for subcontractor selection using discrete particle swarm optimization algorithm. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Bingol, B N and Polat, G (2020) Framework for evaluating quality performances of subcontractors: Case of Turkish contractors. Journal of Construction in Developing Countries, 25(1), pp. 163-179. ISSN 1823-6499

Bingol, B N; Arditi, D and Polat, G (2025) Subcontractor selection for a construction project: Optimal plan. Journal of Construction Engineering and Management, 151(12): 04025205, ISSN 0733-9364

Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.

Birgonul, M T and Ozdogan, I D (2001) Risks borne by foreign contractors doing business in Turkey. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Blakey, L H (1990) Bar codes: Prescription for precision, performance, and productivity. Journal of Construction Engineering and Management, 116(3), pp. 468-479. ISSN 0733-9364

Blanchard, F L (1992) Construction industry organization, labor relations and productivity. PhD thesis, Massachusetts Institute of Technology, USA.

Bloechle, Robert A (1969) Equal employment opportunity in the construction industry. PhD thesis, Creighton University, UK.

Booth, Peter Charles (2023) Digitally integrated material practice: Computational methods of engaging non-standardised plantation hardwood in architecture. PhD thesis, University of Technology Sydney, Australia.

Borg, M (2001) Environmental assessment of materials, components and buildings: Building-specific considerations, open-loop recycling, variations in assessment results and the usage phase of buildings. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Borges, Maria Luiza Abath Escorel (2025) Decision-making optimization method for construction site layout planning based on slp and BIM. PhD thesis, Universidade Estadual de Campinas, Brazil.

Bos-de Vos, M; Lieftink, B; Volker, L and Wamelink, H (2014) International collaboration and partnering in the supply chain as business opportunities for architectural firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Bosch-Rekveldt, M G C (2011) Managing project complexity: A study into adapting early project phases to improve project performance in large engineering projects. PhD thesis, Delft University of Technology, Netherlands.

Bowen, P A; Edwards, P J and Cattell, K (2012) Corruption in the South African construction industry: A thematic analysis of verbatim comments from survey participants. Construction Management and Economics, 30(10), pp. 885-901. ISSN 1466433X

Boyal-Seth, H (2011) Assessing the business case for supplier diversity in the construction housing sector. PhD thesis, Nottingham Trent University, UK.

Boyd, D and Danks, S (2000) An analysis of 'the architectural practice' in the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Bradley, P E and Kohler, N (2007) Methodology for the survival analysis of urban building stocks. Building Research & Information, 35(5), pp. 529-542. ISSN 0961-3218

Brand, M C and Uher, T (2010) Follow-up empirical study of the performance of the New South Wales construction industry security of payment legislation. International Journal of Law in the Built Environment, 2(1), pp. 7-25. ISSN 1756-1450

Brandli, L L; Jüngles, A E and Heineck, L F (1999) Sub-contracting policies: The case of the construction firms in brazil. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Brandão, R; Hosseini, M R; Macêdo, A N; Melo, A C and Martek, I (2022) Public administration strategies that stimulate reverse logistics within the construction industry: A conceptual typology. Engineering, Construction and Architectural Management, 29(8), pp. 2924-2949. ISSN 0969-9988

Brandín, R and Abrishami, S (2021) Information traceability platforms for asset data lifecycle: Blockchain-based technologies. Smart and Sustainable Built Environment, 10(3), pp. 364-386. ISSN 2046-6099

Brett, R; Dainty, A R J and Fernie, S (2024) Direct employment of construction workers: Skill and productivity in site practice. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Bridge, A J and Tisdell, C (2004) The determinants of the vertical boundaries of the construction firm. Construction Management and Economics, 22(8), pp. 807-825. ISSN 01446193

Bridge, A J and Tisdell, C (2006) The determinants of the vertical boundaries of the construction firm: Response. Construction Management and Economics, 24(3), pp. 233-236. ISSN 01446193

Brilakis, I (2005) Content based integration of construction site images in AEC/FM model based systems. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Briscoe, G (2006) How useful and reliable are construction statistics? Building Research & Information, 34(3), pp. 220-229. ISSN 0961-3218

Briscoe, G (2008) Studies of the UK labour market with special reference to the construction sector. PhD thesis, Coventry University, UK.

Briscoe, G H; Dainty, A R J and Millett, S J (1999) The likely impact of the tax system on self-employment in the british construction industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Briscoe, G H; Dainty, A R J; Millett, S J and Neale, R H (2004) Client-led strategies for construction supply chain improvement. Construction Management and Economics, 22(2), pp. 193-201. ISSN 01446193

Brodetskaia, I; Sacks, R and Shapira, A (2013) Stabilizing production flow of interior and finishing works with reentrant flow in building construction. Journal of Construction Engineering and Management, 139(6), pp. 665-674. ISSN 0733-9364

Broft, Rafaella; Badi, Sulafa M and Pryke, Stephen David (2016) Towards supply chain maturity in construction. Built Environment Project and Asset Management, 6(2), pp. 187-204. ISSN 2044-124X

Brown, M M (1995) The architecture of steel: Site planning and building type in the nineteenth-century American Bessemer steel industry. PhD thesis, University of Pittsburgh, USA.

Bruni, M (1981) Business cycles and seasonality in the Italian construction sector. PhD thesis, University of California, Berkeley, USA.

Bröchner, J (1990) Impacts of information technology on the structure of construction. Construction Management and Economics, 8(2), pp. 205-218. ISSN 01446193

Bui, T T P; MacGregor, C; Wilkinson, S and Domingo, N (2023) Towards zero carbon buildings: Issues and challenges in the New Zealand construction sector. International Journal of Construction Management, 23(15), pp. 2709-2716. ISSN 1562-3599

Bula-Diaz, C; Dainty, A and Burns, N (2005) The employment relationship of site and office-based managers in SME construction firms. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Bullen, P A and Davis, P R (2003) Explorations in sustainable construction and procurement in western Australia. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Buyukyoran, F and Gundes, S (2018) Optimized real options-based approach for government guarantees in PPP toll road projects. Construction Management and Economics, 36(4), pp. 203-216. ISSN 01446193

Buzzelli, M D (2001) The Canadian urban housebuilding industry: Firm size structure and production methods in Ontario, 1945–2000. PhD thesis, McMaster University, Canada.

Byrne, J; Clarke, L and Van Der Meer, M (2005) Gender and ethnic minority exclusion from skilled occupations in construction: A Western European comparison. Construction Management and Economics, 23(10), pp. 1025-1034. ISSN 01446193

Cabral, I F (2015) A systematic methodology to analyse the performance and design configurations of business interoperability in cooperative industrial networks. PhD thesis, Universidade NOVA de Lisboa, Portugal.

Cades, A-P (2018) Influence of psychological capital and thinking perspectives on construction safety climate and performance. PhD thesis, Walden University, USA.

Calderon, C and Keirstead, J (2012) Modelling frameworks for delivering low-carbon cities: Advocating a normalized practice. Building Research & Information, 40(4), pp. 504-517. ISSN 0961-3218

Caldwell, Scott A (2024) Empirical decision-making tools as applied to seaports in the industry 4.0 paradigm. PhD thesis, Liverpool John Moores University, UK.

Cameron, I; Gillan, G and Duff, A R (2007) Issues in the selection of fall prevention and arrest equipment. Engineering, Construction and Architectural Management, 14(4), pp. 363-374. ISSN 0969-9988

Canales, A R; Arbelaez, M; Vasquez, E; Aveiga, F; Strong, K; Walters, R; Jaselskis, E J and Jahren, C T (2009) Exploring training needs and development of construction language courses for American supervisors and Hispanic craft workers. Journal of Construction Engineering and Management, 135(5), pp. 387-396. ISSN 0733-9364

Canales Fernandez, A R (2004) Developing effective integration between American supervisors and hispanic craft workers in construction. PhD thesis, Iowa State University, USA.

Cao, D and Wang, G (2014) Contractor-subcontractor relationships with the implementation of emerging interorganizational technologies: Roles of cross-project learning and pre-contractual opportunism. International Journal of Construction Education and Research, 10(4), pp. 268-284. ISSN 1557-8771

Cardoso, A F S P and Torkkeli, M (2014) Innovation in footwear companies: does it pay off? Journal of Engineering, Design and Technology, 12(1), pp. 128-154. ISSN 1726-0531

Carollo, Federica Carla (2023) Circularity in the construction and demolition waste management chain. PhD thesis, Politecnico di Milano, Italy.

Carr, P G (2005) Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders. Journal of Construction Engineering and Management, 131(11), pp. 1165-1172. ISSN 0733-9364

Carrillo, S K C A P (2010) Findings from preliminary case studies on knowledge flow in aerospace and construction supply chains. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Carter, A (2022) Perceptions of construction trade careers amid a growing labor shortage: An exploratory study. PhD thesis, Wilmington University (Delaware), USA.

Carter, K and Fortune, C (2004) Issues with data collection methods in construction management research. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Carty, G J (1995) Construction. Journal of Construction Engineering and Management, 121(3), pp. 319-328. ISSN 0733-9364

Cass, D and Mukherjee, A (2011) Calculation of greenhouse gas emissions for highway construction operations by using a hybrid life-cycle assessment approach: Case study for pavement operations. Journal of Construction Engineering and Management, 137(11), pp. 1015-1025. ISSN 0733-9364

Cass, Yael (2020) The challenges and opportunities faced by women in the construction industry when progressing their careers in trades and professional roles. PhD thesis, RMIT University, Australia.

Cavalcante, Gustavo Henrique Ferreira (2022) Seismic risk analysis of typical bridges located in the northeastern Brazil. PhD thesis, Universidade Estadual de Campinas, Brazil.

Chakravarty, S (2002) Essays on contracting in the construction industry. PhD thesis, University of Southern California, USA.

Chalker, M and Loosemore, M (2016) Trust and productivity in Australian construction projects: A subcontractor perspective. Engineering, Construction and Architectural Management, 23(2), pp. 192-210. ISSN 0969-9988

Champion, R (2005) Acceleration in construction and engineering contracts. PhD thesis, University of London, UK.

Chan, A P C; Chiang, Y H; Wong, F K W; Liang, S and Abidoye, F A (2020) Work-life balance for construction manual workers. Journal of Construction Engineering and Management, 146(5): 04020031, ISSN 0733-9364

Chan, C H F (2010) To talk or to fight? Collective effects of strategic, cultural, and institutional factors on investors' renegotiation approach in public-private concessions. PhD thesis, Stanford University, USA.

Chan, C M R and Harris, F C (1989) A database/spreadsheet application for equipment selection. Construction Management and Economics, 7(3), pp. 235-247. ISSN 01446193

Chan, K-W (2010) The transaction costs and the choice of contractual arrangements in the construction industry in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Chan, P W and McCabe, S (2010) Emerging disparities: Exploring the impacts of the financial crisis on the UK construction labour market. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Chan, T K (2017) Global supply chains: A preliminary analysis of the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364

Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364

Chang, C Y (2006) The determinants of the vertical boundaries of the construction firm: Comment. Construction Management and Economics, 24(3), pp. 229-232. ISSN 01446193

Chang, C Y and Ive, G (2007) Reversal of bargaining power in construction projects: Meaning, existence and implications. Construction Management and Economics, 25(8), pp. 845-855. ISSN 1466433X

Chang, C Y and Qian, Y (2015) An econometric analysis of holdup problems in construction projects. Journal of Construction Engineering and Management, 141(6): 04015004, ISSN 0733-9364

Chang, M (2016) Investigating and improving bridge management system methodologies under uncertainty. PhD thesis, Utah State University, USA.

Chang, Y H and Tang, B (2005) Trust, partnership and power in construction: Theory and applications in Hong Kong. Journal of Construction Procurement, 11(2), pp. 94-111.

Chang-Richards, Y; Wilkinson, S; Seville, E and Brunsdon, D (2017) Effects of a major disaster on skills shortages in the construction industry: Lessons learned from New Zealand. Engineering, Construction and Architectural Management, 24(1), pp. 2-20. ISSN 0969-9988

Chao, C-H (2001) Formulation of an e -business inter-enterprise collaboration for the construction industry. PhD thesis, Northwestern University, USA.

Chasey, A D and Merchant, S (2000) Issues for construction of 300-mm fab. Journal of Construction Engineering and Management, 126(6), pp. 451-457. ISSN 0733-9364

Chau, K W; Poon, S W; Wang, Y S and Lu, L L (2005) Technological progress and the productive efficiency of construction firms in Hong Kong, 1981-2001. Journal of Construction Research, 6(2), pp. 195-207. ISSN 1609-9451

Cheah, C Y J (2007) Construction safety and health factors at the industry level: The case of Singapore. Journal of Construction in Developing Countries, 12(2), pp. 81-99. ISSN 1823-6499

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, S.; Guan, Z.; Zhang, Z.; Guo, H. and Han, Y. (2026) Impact of construction workers' physical fatigue on unsafe behavior: An ecg-based field experiment study. Journal of Construction Engineering and Management, 152(8): 04026128, ISSN 0733-9364

Chen, C; Lv, L; Wang, Z and Qiao, R (2023) Bargaining optimization model for risk renegotiation with fairness concerns in infrastructure PPP projects. Engineering, Construction and Architectural Management, 30(9), pp. 3876-3894. ISSN 0969-9988

Chen, Jamie (2025) Improving construction supply chain material management resilience through mathematical optimisation. PhD thesis, University of New South Wales, Australia.

Chen, N; Zhang, Z and Chen, A (2025) Comprehensive evaluation of classification: an empirical study on consequence prediction of construction accidents in China. Construction Innovation, 25(4), pp. 1210-1230. ISSN 1471-4175

Chen, Q; Adey, B T; Haas, C and Hall, D M (2020) Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies. Construction Innovation, 20(3), pp. 471-508. ISSN 1471-4175

Chen, Q; Adey, B T; Haas, C T and Hall, D M (2022) Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation, 22(1), pp. 76-100. ISSN 1471-4175

Chen, Q; Garcia de Soto, B and Adey, B (2022) Transshipment approach to coordinate materials for a contractor's project portfolio. International Journal of Construction Management, 22(16), pp. 3065-3076. ISSN 1562-3599

Chen, Q; Hall, D M; Adey, B T and Haas, C T (2021) Identifying enablers for coordination across construction supply chain processes: A systematic literature review. Engineering, Construction and Architectural Management, 28(4), pp. 1083-1113. ISSN 0969-9988

Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.

Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains. PhD thesis, Stanford University, USA.

Chen, X (2019) Big data in construction project management: prospects and challenges. PhD thesis, University of Hong Kong, Hong Kong.

Chen, X; Ding, Y; Cory, C A; Hu, Y; Wu, K J and Feng, X (2021) A decision support model for subcontractor selection using a hybrid approach of QFD and AHP-improved grey correlation analysis. Engineering, Construction and Architectural Management, 28(6), pp. 1780-1806. ISSN 0969-9988

Chen, Y; Chen, S; Hu, C; Jin, L and Zheng, X (2020) Novel probabilistic cost estimation model integrating risk allocation and claim in hydropower project. Journal of Construction Engineering and Management, 146(8): 04020092, ISSN 0733-9364

Chen, Yu (2024) Improving information requirements management in complex rail transport projects. PhD thesis, University of Technology Sydney, Australia.

Chen, Z; Li, T; Qin, L and Jiang, Y (2025) Vision-guided autonomous block loading in a dual-robot collaborative handling framework. Journal of Construction Engineering and Management, 151(5): 04025035, ISSN 0733-9364

Cheng, M Y; Vu, Q T; Dessalegn, M and Chen, J H (2025) Time-dependent rebar price prediction for procurement decision-making using bio-optimized deep machine learning. Engineering, Construction and Architectural Management, 32(12), pp. 7938-7971. ISSN 0969-9988

Cheng, E W L and li, H (2003) Utility of consistency measure in the analytic hierarchy process. Construction Innovation, 3(4), pp. 231-247. ISSN 1471-4175

Cheung, F K T; Kurul, E and Oti, A H (2016) A case study of hybrid strategies to create value for a contracting business in the education sector in England and Wales. Construction Management and Economics, 34(4-5), pp. 335-352. ISSN 01446193

Cheung, S O; Yiu, T W Y and Yeung, S F (2006) A study of styles and outcomes in construction dispute negotiation. Journal of Construction Engineering and Management, 132(8), pp. 805-814. ISSN 0733-9364

Chi, Sae (2018) Developing a methodology for evaluating privately operated toll road projects using stochastic cost-benefit analysis. PhD thesis, Queensland University of Technology, Australia.

Chiang, Y H and Cheng, E W L (2010) Construction loans and industry development: The case of Hong Kong. Construction Management and Economics, 28(9), pp. 959-969. ISSN 1466433X

Chiang, Y H; Tang, B S and Wong, F (2008) Volume building as competitive strategy. Construction Management and Economics, 26(2), pp. 161-176. ISSN 1466433X

Chiang, Y H; Wong, F K W and Liang, S (2018) Fatal construction accidents in Hong Kong. Journal of Construction Engineering and Management, 144(3): 04017121, ISSN 0733-9364

Chih, Y Y; Kiazad, K; Cheng, D; Emamirad, E and Restubog, S L (2018) Interactive effects of supportive leadership and top management team's charismatic vision in predicting worker retention in the Philippines. Journal of Construction Engineering and Management, 144(10): 04018095, ISSN 0733-9364

Chileshe, N; Rameezdeen, R and Hosseini, M R (2016) Drivers for adopting reverse logistics in the construction industry: A qualitative study. Engineering, Construction and Architectural Management, 23(2), pp. 134-157. ISSN 0969-9988

Chileshe, N; Rameezdeen, R; Lehmann, S and Hosseini, M r (2014) Reverse logistics (RL) implementation among contractors in Australia: Practices and barriers. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Chin, S (1997) An integrated life-cycle information framework for construction project management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Choi, Seogjae (2024) Addressing material-related issues in industrial construction projects: The state of supplier involvement in project planning and the barriers to information sharing. PhD thesis, University of Texas at Austin, USA.

Chong, W-h B (2016) A process-data supported input-output framework for delineating the embodied emissions of Hong Kong construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Choudhry, R M; Hinze, J W; Arshad, M and Gabriel, H F (2012) Subcontracting practices in the construction industry of Pakistan. Journal of Construction Engineering and Management, 138(12), pp. 1353-1359. ISSN 0733-9364

Choudhury, T (2013) Experiences of women as workers: A study of construction workers in Bangladesh. Construction Management and Economics, 31(8), pp. 883-898. ISSN 1466433X

Choudhury, T (2014) Masculinities, feminities and gender relations in contemporary Bangladesh: an analysis of the construction sector in Sylhet. PhD thesis, University of Hull, UK.

Chua Ying Kit, J (1996) The human-machine interface (HMI) and re-bar detection aspects of a non-destructive testing (NDT) robot. PhD thesis, City, University of London, UK.

Chuang, J (2014) The changing foundations of Chinese development: From low-cost labor to land dispossession. PhD thesis, University of California, Berkeley, USA.

Chuing, L S (2015) Modelling capability-based risk assessment for international construction project ventures. PhD thesis, University of Malaya, Malaysia.

Clarke, L; Gleeson, C and Winch, C (2016) What kind of expertise is needed for low energy construction? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Clarke, L and Gribling, M (2008) Obstacles to diversity in construction: The example of Heathrow Terminal 5. Construction Management and Economics, 26(10), pp. 1055-1065. ISSN 1466433X

Clarke, L and Herrmann, G (2004) Cost vs. Production: Labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), pp. 1057-1066. ISSN 01446193

Clarke, L and Herrmann, G (2004) Cost vs. Production: Disparities in social housing construction in Britain and Germany. Construction Management and Economics, 22(5), pp. 521-532. ISSN 01446193

Clarke, L and Wall, C (2000) Craft versus industry: The division of labour in European housing construction. Construction Management and Economics, 18(6), pp. 689-698. ISSN 01446193

Clarke, L; van der Meer, M; Bingham, C; Michielsens, E and Miller, S (2009) Enabling and disabling: Disability in the British and Dutch construction sectors. Construction Management and Economics, 27(6), pp. 555-566. ISSN 1466433X

Clemens, R J (1982) A history of the United Brotherhood of Carpenters and Joiners in Missouri, 1881-1981. PhD thesis, University of Missouri - Columbia, USA.

Cockerill, J E (1993) The construction industry in belfast 1800-1914. PhD thesis, Queen's University Belfast, UK.

Coolican, Alice Maeve (1989) A history of industrial relations in the Sydney building trades, 1870-1914. PhD thesis, University of New South Wales, Australia.

Correia, J M F; De Oliveira Neto, G C; Leite, R R and Da Silva, D (2021) Plan to overcome barriers to reverse logistics in construction and demolition waste: Survey of the construction industry. Journal of Construction Engineering and Management, 147(2): 04020172, ISSN 0733-9364

Costa, S; Carvalho, M S; Pimentel, C and Duarte, C (2023) A systematic literature review and conceptual framework of construction industrialization. Journal of Construction Engineering and Management, 149(2): 3122013, ISSN 0733-9364

Costantino, N and Pietroforte, R (2004) Production arrangements by us building and non-building contractors: An update. Construction Management and Economics, 22(3), pp. 231-235. ISSN 01446193

Costantino, N; Pietroforte, R and Hamill, P (2001) Subcontracting in commercial and residential construction: An empirical investigation. Construction Management and Economics, 19(4), pp. 439-447. ISSN 01446193

Costanzo, V; Fabbri, K; Schito, E; Pretelli, M and Marletta, L (2021) Microclimate monitoring and conservation issues of a baroque church in Italy: A risk assessment analysis. Building Research & Information, 49(7), pp. 729-747. ISSN 0961-3218

Cox, A and Ireland, P (2002) Managing construction supply chains: The common sense approach. Engineering, Construction and Architectural Management, 9(5-6), pp. 409-418. ISSN 0969-9988

Cox, A and Townsend, M (1997) Latham as half-way house: A relational competence approach to better practice in construction procurement. Engineering, Construction and Architectural Management, 4(2), pp. 143-158. ISSN 0969-9988

Cox, R F; Issa, R R A and Frey, A (2006) Proposed subcontractor-based employee motivational model. Journal of Construction Engineering and Management, 132(2), pp. 152-163. ISSN 0733-9364

Cubas Norando, G (2010) Essays on infrastructure, female labor force participation and economic development. PhD thesis, University of Iowa, USA.

Dabke, S; Salem, O; Genaidy, A and Daraiseh, N (2008) Job satisfaction of women in construction trades. Journal of Construction Engineering and Management, 134(3), pp. 205-216. ISSN 0733-9364

Dadzoe, F; Addy, M; Duah, D Y A and Adesi, M (2024) Towards a circular economy: A knowledge-attitude gap between demand and supply-side operators on green building construction in Ghana. Smart and Sustainable Built Environment, 13(4), pp. 763-779. ISSN 2046-6099

Dainty, A R J; Bagilhole, B M; Ansari, K H and Jackson, J (2004) Creating equality in the construction industry: an agenda for change for women and ethnic minorities. Journal of Construction Research, 5(1), pp. 75-86. ISSN 1609-9451

Dainty, A R J; Briscoe, G H and Millett, S J (2001) Subcontractor perspectives on supply chain alliances. Construction Management and Economics, 19(8), pp. 841-848. ISSN 01446193

Dainty, A R J; Ison, S G and Briscoe, G H (2005) The construction labour market skills crisis: The perspective of small-medium-sized firms. Construction Management and Economics, 23(4), pp. 387-398. ISSN 01446193

Daniel, E I; Oshodi, O S and Marte Gomez, J (2025) Developing future skills for the engineering sector: evidence from the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 65-75. ISSN 17514304

Das, M (2015) Social BIMCloud: a distributed cloud-based BIM framework for object-based lifecycle information exchange and supply chain integration. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Das, M; Cheng, J C P and Law, K H (2015) An ontology-based web service framework for construction supply chain collaboration and management. Engineering, Construction and Architectural Management, 22(5), pp. 551-572. ISSN 0969-9988

Dave, B (2017) Business process management: A construction case study. Construction Innovation, 17(1), pp. 50-67. ISSN 1471-4175

David, D D (2007) Numerical platform to validate resistivity testing for NDE of civil engineering structures. PhD thesis, Wayne State University, USA.

Davis, C (2020) The influence of national culture on conflict in project management: How organizations manage conflict. PhD thesis, Northcentral University, USA.

Davis, P R and Walker, D H T (2004) Relationship based procurement. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.

De Souza, D V S (2015) A conceptual framework and best practices for designing and improving construction supply chains. PhD thesis, University of Salford, UK.

Deep, S (2021) Influence of ‘power’ and ‘dependence’ attributes on main contractor and sub-contractor collaboration in construction projects. PhD thesis, University of Newcastle, Australia.

Deep, S; Gajendran, T and Jefferies, M (2023) Antecedents of "power" and "dependence" in the context of collaborations in construction projects: A systematic literature review. Construction Innovation, 23(5), pp. 1279-1299. ISSN 1471-4175

Deep, S; Gajendran, T; Jefferies, M; Uggina, V S and Patil, S (2024) Influence of subcontractors' "strategic capabilities" on "power", "dependence" and "collaboration": An empirical analysis in the context of procurement decisions. Engineering, Construction and Architectural Management, 31(2), pp. 571-592. ISSN 0969-9988

Deng, B; Lv, X; Du, Y; Li, X and Yin, Y (2025) Critical risk factors for construction supply chain in China: A fuzzy synthetic evaluation analysis. Engineering, Construction and Architectural Management, 32(1), pp. 483-506. ISSN 0969-9988

Deng, Y (2015) Mapping of BIM and GIS for interoperable geospatial data management and analysis for the built environment. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Deng, Y; Gan, V J L; Das, M; Cheng, J C P and Anumba, C (2019) Integrating 4D BIM and GIS for construction supply chain management. Journal of Construction Engineering and Management, 145(4): 04019016, ISSN 0733-9364

Denicol, Juliano (2019) Designing client organisations and supply chain strategies to deliver megaprojects. PhD thesis, University College London, UK.

Devaney, S and Roberts, D (2012) Who gets the jobs? Factors influencing the employability of property and construction graduates in the UK. Construction Management and Economics, 30(3), pp. 233-246. ISSN 1466433X

Devapriya, K A K and Ganesan, S (2002) Technology transfer through subcontracting in developing countries. Building Research & Information, 30(3), pp. 171-182. ISSN 0961-3218

Dhal, M (2020) Labor stand: Face of precarious migrant construction workers in India. Journal of Construction Engineering and Management, 146(6): 04020048, ISSN 0733-9364

Dharmapalan, V; O'Brien, W J; Morrice, D and Jung, M (2021) Assessment of visibility in industrial construction projects: A viewpoint from supply chain stakeholders. Construction Innovation, 21(4), pp. 782-799. ISSN 1471-4175

Dharmapalan, Vineeth (2021) Supply chain visibility for industrial construction projects: Assessment of benefits, current status, definitions, barriers, and enablers. PhD thesis, University of Texas at Austin, USA.

Dhawan, K; Tookey, J; Fredriksson, A and Tetik, M (2026) Decarbonising construction logistics: The role of supplier-led distribution and integrated warehousing. Construction Innovation, 26(9), pp. 21-48. ISSN 1471-4175

Dhawan, K (2023) Supply chain management driven logistics efficiency in the New Zealand construction sector. PhD thesis, Auckland University of Technology, New Zealand.

Dike, I (2017) A critical exploration of the impact of building information modelling on the culture and performance of UK construction supply chains. PhD thesis, Coventry University, UK.

Dike, I U and Kapogiannis, G (2014) A conceptual model for improving construction supply chain performance. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Dikmen, I; Birgonul, M T and Arikan, A E (2004) A critical review of risk management support tools. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Dikmen, I; Birgonul, M T; Ozorhon, B and Sapci, N E (2010) Using analytic network process to assess business failure risks of construction firms. Engineering, Construction and Architectural Management, 17(4), pp. 369-386. ISSN 0969-9988

Dioguardi, G (1983) Macrofirms: Construction firms for the computer age. Journal of Construction Engineering and Management, 109(1), pp. 13-24. ISSN 0733-9364

Dithebe, K; Aigbavboa, C O; Thwala, W D and Oke, A E (2019) Analysis on the perceived occurrence of challenges delaying the delivery of water infrastructure assets in South Africa. Journal of Engineering, Design and Technology, 17(3), pp. 554-571. ISSN 1726-0531

Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599

Dobrovnik, M.; Herold, D. M. and Kummer, S. (2026) Perception differences in dynamic capabilities for digital supply chain transformation across managerial hierarchies: A DEMATEL-based analysis in the construction industry. Construction Innovation, 26(9), pp. 204-232. ISSN 1471-4175

Domdouzis, K (2007) Applications of wireless sensor technologies in construction. PhD thesis, Loughborough University, UK.

Donato, Matteo (2016) The influence of resource dependency on collaboration in the construction supply chain. PhD thesis, Victoria University, Australia.

Dong, H (2024) Impact of sensing and occupancy parameters to achieve comfort and demand side management in buildings. PhD thesis, Michigan State University, USA.

Dong, Y; Hu, Y; Cai, J; Xu, X and Li, S (2025) Improving construction workforce entry by examining construction equipment operators' employment practices. Journal of Construction Engineering and Management, 151(10): 04025138, ISSN 0733-9364

Dou, Y; Zhong, L and Luo, L (2025) Supply chain resilience of prefabricated construction: Perspectives of stakeholder capabilities and vulnerabilities. Journal of Construction Engineering and Management, 151(4): 04025013, ISSN 0733-9364

Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387

Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387

Dowsett, R; Green, M; Sexton, M and Harty, C (2019) Projecting at the project level: MMC supply chain integration roadmap for small housebuilders. Construction Innovation, 19(2), pp. 193-211. ISSN 1471-4175

Drews, F (2018) Designing meta-organisations: an empirical study of boundary setting in large infrastructure projects. PhD thesis, University of Manchester, UK.

Druker, J and Croucher, R (1999) Human resource management in European construction companies. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Druker, J and Croucher, R (2000) National collective bargaining and employment flexibility in the European building and civil engineering industries. Construction Management and Economics, 18(6), pp. 699-709. ISSN 01446193

Du, J; Xue, Y; Sugumaran, V; Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(4), pp. 1601-1635. ISSN 0969-9988

Duan, P; Zhou, J and Tao, S (2023) Risk events recognition using smartphone and machine learning in construction workers' material handling tasks. Engineering, Construction and Architectural Management, 30(8), pp. 3562-3582. ISSN 0969-9988

Dulaimi, M; Khalfan, M M A and McDermott, P (2006) Innovating for supply chain integration within construction. Construction Innovation, 6(3), pp. 143-157. ISSN 1471-4175

Dulaimi, M; Stewart, I and Fenn, P (2006) Strategy: The motivation for innovation. Construction Innovation, 6(3), pp. 173-185. ISSN 1471-4175

Dulung, A Z A (2007) Computer aided decision support system for the selection of subcontractors in building refurbishment works. PhD thesis, National University of Singapore, Singapore.

Duman, D U; Löwstedt, M and Sundquist, V (2022) Moving beyond business as usual? Exploring digital transformation in the Swedish construction sector. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Duodo, B (2017) Intellectual capital and innovation in construction firms: the role of learning capability. PhD thesis, University of Hong Kong, Hong Kong.

Duong, A. T. B.; Ta, T. D.; Truong, D. Q.; Hoang, T. G.; Pham, H.; Hoang, T. H. and Truong Quang, H. (2026) Direct and indirect effect of risk on construction supply chain in disruption era: A service-oriented view. Engineering, Construction and Architectural Management, 33(4), pp. 2995-3024. ISSN 0969-9988

Duong, T B A; Pham, T; Truong, Q H; Nguyen, K; Pham, C H; Hoang, T H and Pham, T H (2023) Risk in sustainable construction supply chains: Construct development and measurement validation. Construction Management and Economics, 41(8), pp. 634-650. ISSN 01446193

Duryan, M and Smyth, H (2019) Service design and knowledge management in the construction supply chain for an infrastructure programme. Built Environment Project and Asset Management, 9(1), pp. 118-137. ISSN 2044-124X

Dzeng, R J and Wu, J S (2013) Efficiency measurement of the construction industry in Taiwan: A stochastic frontier cost function approach. Construction Management and Economics, 31(4), pp. 335-344. ISSN 1466433X

Dzokoto, F K; Edum-Fotwe, F and Demian, P (2014) Conceptualising actors' information behaviour: An investigation into project information dynamics. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Eccles, R G J (1979) Organization and market structure in the construction industry: A study of subcontracting. PhD thesis, Harvard University, USA.

Edema, E U (2020) Risk mitigation strategies to prevent the failure of civil engineering projects in Nigeria. PhD thesis, Northcentral University, USA.

Edwards, D J; Holt, G D and Harris, F C (1998) Financial management of construction plant: Conceptualising cost prediction. Journal of Financial Management of Property and Construction, 3(2), pp. 59-74. ISSN 1366-4387

Egbu, C O (1994) Management education and training for refurbishment work within the construction industry. PhD thesis, University of Salford, UK.

Egbu, C O (1999) Skills, knowledge and competencies for managing construction refurbishment works. Construction Management and Economics, 17(1), pp. 29-43. ISSN 01446193

Eissa, R; Eid, M S and Elbeltagi, E (2021) Current applications of game theory in construction engineering and management research: A social network analysis approach. Journal of Construction Engineering and Management, 147(7): 0002085, ISSN 0733-9364

Eissa, R and El-Adaway, I H (2024) Accelerating the circular economy transition: A construction value chain-structured portfolio of strategies and implementation insights. Journal of Construction Engineering and Management, 150(8): 04024077, ISSN 0733-9364

Ejohwomu, O A (2007) Modelling the supply and demand for construction and building services skills in the Black Country. PhD thesis, University of Wolverhampton, UK.

Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2005) A conceptual demand led model founded on theories of labour market mismatch for the construction and building services industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2006) Multiskilling: A UK construction and building services perspective. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2008) The impact of multiskilling on UK's construction manpower. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(1), pp. 25-30. ISSN 17514312

Ekanayake, E; Shen, G Q and Kumaraswamy, M (2021) Supply chain resilience: Mapping the knowledge domains through a bibliometric approach. Built Environment Project and Asset Management, 11(4), pp. 705-721. ISSN 2044-124X

Ekanayake, E M A C; Shen, G; Kumaraswamy, M and Owusu, E K (2022) A fuzzy synthetic evaluation of vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 29(6), pp. 2358-2381. ISSN 0969-9988

Ekanayake, E M A C; Shen, G; Kumaraswamy, M; Owusu, E K and Xue, J (2022) Capabilities to withstand vulnerabilities and boost resilience in industrialized construction supply chains: A Hong Kong study. Engineering, Construction and Architectural Management, 29(10), pp. 3809-3829. ISSN 0969-9988

Ekanayake, E M A C; Shen, G and Kumaraswamy, M M (2021) Critical capabilities of improving supply chain resilience in industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 28(10), pp. 3236-3260. ISSN 0969-9988

Ekanayake, E M A C; Shen, G Q; Kumaraswamy, M and Owusu, E K (2021) Critical supply chain vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 28(10), pp. 3041-3059. ISSN 0969-9988

Ekanayake, E M A C; Shen, G Q P; Kumaraswamy, M M and Owusu, E K (2022) Identifying supply chain vulnerabilities in industrialized construction: An overview. International Journal of Construction Management, 22(8), pp. 1464-1477. ISSN 1562-3599

Ekanayake, E M A C; Shen, G Q P; Kumaraswamy, M M; Owusu, E K and Saka, A B (2021) Modeling supply chain resilience in industrialized construction: A Hong Kong case. Journal of Construction Engineering and Management, 147(11): 05021009, ISSN 0733-9364

Ekanayake, E M A C; Xue, J; Shen, G Q and Kumaraswamy, M M (2021) Dynamic supply chain vulnerability analysis of Hong Kong-Zhuhai-Macao Bridge construction: A topic modelling approach. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Ekeskär, A; Havenvid, M I and Gustavsson, T K (2019) Horizontal inter-organizational collaboration: The case of third-party logistics. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ekeskär, A; Havenvid, M I; Karrbom Gustavsson, T and Eriksson, P E (2022) Construction logistics in a multi-project context: Coopetition among main contractors and the role of third-party logistics providers. Construction Management and Economics, 40(1), pp. 25-40. ISSN 01446193

Ekeskär, A and Rudberg, M (2016) Third-party logistics in construction: The case of a large hospital project. Construction Management and Economics, 34(3), pp. 174-191. ISSN 01446193

El-Anwar, O and Aziz, T A (2014) Integrated urban-construction planning framework for slum upgrading projects. Journal of Construction Engineering and Management, 140(4): B4014003, ISSN 0733-9364

El-Kholy, A M (2022) A new technique for subcontractor selection by adopting choosing by advantages. International Journal of Construction Management, 22(7), pp. 1171-1193. ISSN 1562-3599

El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175

Elazouni, A M and Metwally, F G (2000) D-sub: Decision support system for subcontracting construction works. Journal of Construction Engineering and Management, 126(3), pp. 191-199. ISSN 0733-9364

Elbashbishy, T and El-Adaway, I H (2026) Assessing the criticality of construction trades: Skilled labor shortages and their cost and schedule impacts. Journal of Construction Engineering and Management, 152(1): 04025230, ISSN 0733-9364

Elghaish, F; Matarneh, S T; Edwards, D J; Pour Rahimian, F; El-Gohary, H and Ejohwomu, O (2022) Applications of industry 4.0 digital technologies towards a construction circular economy: Gap analysis and conceptual framework. Construction Innovation, 22(3), pp. 647-670. ISSN 1471-4175

Elhakeem, A A M (2006) An asset management framework for educational buildings with life-cycle cost analysis. PhD thesis, University of Waterloo, Canada.

Elkliny, A.; Mahmoudi, A.; Deng, X. and Gaber, M. M. (2026) Data-driven identification of critical skills for international construction supply chain management practitioners. Engineering, Construction and Architectural Management, pp. 1-31. ISSN 0969-9988

Elkliny, A.; Mahmoudi, A.; Deng, X. and Gaber, M. M. (2026) Data-driven identification of critical skills for international construction supply chain management practitioners. Engineering, Construction and Architectural Management, pp. 1-31. ISSN 0969-9988

Elliman, T and Orange, G (2003) Developing distributed design capabilities in the construction supply chain. Construction Innovation, 3(1), pp. 15-26. ISSN 1471-4175

Elmisalami, T; Walters, R and Jaselskis, E J (2006) Construction IT decision making using multiattribute utility theory for use in a laboratory information management system. Journal of Construction Engineering and Management, 132(12), pp. 1275-1283. ISSN 0733-9364

Emuze, F A (2011) Performance improvement in South African construction. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

Enshassi, A; Arain, F and Tayeh, B (2012) Major causes of problems between contractors and subcontractors in the Gaza Strip. Journal of Financial Management of Property and Construction, 17(1), pp. 92-112. ISSN 1366-4387

Eom, C S J; Yun, S H and Paek, J H (2008) Subcontractor evaluation and management framework for strategic partnering. Journal of Construction Engineering and Management, 134(11), pp. 842-851. ISSN 0733-9364

Ergen, E (2005) Formalization of life-cycle data management of engineered-to-order components using advanced tracking technologies. PhD thesis, Carnegie Mellon University, USA.

Eriksson, V; Hulthén, K; Sundquist, V; Fredriksson, A and Janné, M (2021) The role of public actors in construction logistics: Effects on and of relational interfaces. Construction Management and Economics, 39(10), pp. 791-806. ISSN 01446193

Ertekin, A O (2013) Probabilistic life cycle cost optimization of bridges. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.

Escamilla, E; Ostadalimakhmalbaf, M and Bigelow, B F (2016) Factors impacting Hispanic high school students and how to best reach them for the careers in the construction industry. International Journal of Construction Education and Research, 12(2), pp. 82-98. ISSN 1557-8771

Esmaeili, B and Hallowell, M R (2012) Diffusion of safety innovations in the construction industry. Journal of Construction Engineering and Management, 138(8), pp. 955-963. ISSN 0733-9364

Essaghouri, L.; Xu, F.; Zhu, C.; Aletoum, E. and Li, X. (2026) Two decades of embodied carbon in MENA's construction sector: Regional insights and policy implications. Journal of Construction Engineering and Management, 152(10): 04026171, ISSN 0733-9364

Evarist, C; Luvara, V G M and Chileshe, N (2023) Perception on constraining factors impacting recruitment and selection practices of building contractors in Dar es Salaam, Tanzania. International Journal of Construction Management, 23(12), pp. 2012-2023. ISSN 1562-3599

Evdorides, H and Shoji, M (2013) Public-private partnerships for road infrastructure services in Zambia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 277-286. ISSN 17514312

Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2010) Development of an ICT-based logistics framework for the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2015) Decision-making framework for selecting ICT-based construction logistics systems. Journal of Engineering, Design and Technology, 13(2), pp. 260-281.

Fadiya, O O (2012) Development of an integrated decision analysis framework for selecting ICT-based logistics systems in the construction industry. PhD thesis, University of Wolverhampton, UK.

Fahy, P (2007) Cross cultural training and the effective integration of the construction supply chain. PhD thesis, University College London, UK.

Faisol, N; Dainty, A R J and Price, A D F (2005) The concept of 'relational contracting' as a tool for understanding inter- organizational relationships in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Fang, Y and Ng, S T (2011) Applying activity-based costing approach for construction logistics cost analysis. Construction Innovation, 11(3), pp. 259-281. ISSN 1471-4175

Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988

Farid, F and Koning, T L (1994) Simulation verifies queuing program for selecting loader-truck fleets. Journal of Construction Engineering and Management, 120(2), pp. 386-404. ISSN 0733-9364

Feldmann, F G (2022) Novel perspectives on sustainable value creation: Challenging the status quo by implementing advanced technologies into supply chain processes. PhD thesis, Friedrich-Alexander-Universitaet Erlangen-Nuernberg, Germany.

Feng, H; Song, Q; Yin, C and Cao, D (2022) Adaptive impedance control method for dynamic contact force tracking of robotic excavators. Journal of Construction Engineering and Management, 148(11): 04022124, ISSN 0733-9364

Feng, K (2022) Infrastructure resilience and management under changing tropical cyclone risk. PhD thesis, Princeton University, USA.

Feng, Z; Chao, Q; Tan, C and Yang, Y (2023) Using bargaining model with loss aversion and a risk of breakdown to determine compensation for buyback of early terminating BOT highway projects. Journal of Construction Engineering and Management, 149(5): 04023024, ISSN 0733-9364

Fernandez-Solis, J L; Porwal, V; Lavy, S; Shafaat, A; Rybkowski, Z K; Son, K and Lagoo, N (2013) Survey of motivations, benefits, and implementation challenges of last planner system users. Journal of Construction Engineering and Management, 139(4), pp. 354-360. ISSN 0733-9364

Fernando, S; Hansen, E; Kozak, R and Sinha, A (2018) Organizational cultural compatibility of engineered wood products manufacturers and building specifiers in the Pacific Northwest. Architectural Engineering and Design Management, 14(5), pp. 398-410. ISSN 1745-2007

Finne, C (2006) Publishing building product information: A value net perspective. Construction Innovation, 6(2), pp. 79-96. ISSN 1471-4175

Fireman, M C T; Saurin, T A; Formoso, C T; Koskela, L and Tommelein, I D (2023) Slack in production planning and control: A study in the construction industry. Construction Management and Economics, 41(3), pp. 256-276. ISSN 01446193

Firman, Tommy (1988) Labor flows and the construction industry: The case of housing development in Bandung, Indonesia. PhD thesis, University of Hawaii at Manoa, USA.

Fisher, D J (1989) Piping erection constructability issues in a semiautomated environment. PhD thesis, University of Texas at Austin, USA.

Fisher, D J and O’Connor, J T (1991) Constructability for piping automation: Field operations. Journal of Construction Engineering and Management, 117(3), pp. 468-485. ISSN 0733-9364

Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771

Fordjour, G A; Chan, A P C and Tuffour-Kwarteng, L (2021) Exploring construction employees’ perspectives on the potential causes of psychological health conditions in the construction industry: A study in Ghana. International Journal of Construction Education and Research, 17(4), pp. 373-393. ISSN 1557-8771

Forsman, S; Björngrim, N; Bystedt, A; Laitila, L; Bomark, P and Öhman, M (2012) Need for innovation in supplying engineer-to-order joinery products to construction: A case study in Sweden. Construction Innovation, 12(4), pp. 464-491. ISSN 1471-4175

Francis, M; Ramachandra, T and Rotimi, J O B (2016) Strategies to minimise the effects of delayed payments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 199-207. ISSN 17514304

Franz, B; Wang, T and Issa, R R (2023) Exploration of burnout in early-career construction management professionals in the USA. Engineering, Construction and Architectural Management, 30(3), pp. 1061-1079. ISSN 0969-9988

Franzè, A P; Belek Fialho Teixeira, M; Caldwell, G; Rafizadeh, H R; Schork, T; Gainey, L and Zahra, T (2025) Bricklayers' perspectives on human-robot collaboration (HRC) in on-site masonry construction: Opportunities, challenges, and considerations. Construction Innovation, 25(7), pp. 384-408. ISSN 1471-4175

Fredriksson, A; Janné, M and Peltokorpi, A (2024) Making logistics a central core in complex construction projects: a power-dependency analysis. Construction Management and Economics, 42(11-12), pp. 963-976. ISSN 01446193

Fredriksson, A; Kjellsdotter Ivert, L and Naz, F (2025) Creating logistics service value in construction: A quest of coordinating modules in a loosely coupled system. Construction Management and Economics, 43(6), pp. 428-445. ISSN 0144-6193

Fredriksson, A; Sezer, A A and Sundquist, V (2024) Construction logistics status and actors’ opinions: An industry wide survey in Sweden. Construction Innovation, 24(7), pp. 319-340. ISSN 1471-4175

Fredslund, L M and Gottlieb, S C (2018) Engaging the construction supply chain: A pluralistic perspective. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Fredslund, L M; Gottlieb, S C and Leiringer, R (2019) Understanding supply chain integration as recoupling. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Frimpong, S; Sunindijo, R Y; Wang, C C; Hon, C K H; Boadu, E F and Dansoh, A (2025) Developing and validating a positive mental health scale for the global south construction industry: The construction industry positive mental health inventory (CI-pmhi). Construction Innovation, 25(1), pp. 78-103. ISSN 1471-4175

Fuentes-Del-burgo, J; Fernández, J P R and Navarro-Astor, E (2024) Kanban applied to construction: A literature review. Construction Economics and Building, 24(4-5), pp. 43-57. ISSN 2204-9029

Fuentes-del-Burgo J, N-A E (2013) Do educational mismatches influence job satisfaction? In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Galanis, P (2014) Probabilistic methods to identify seismically hazardous older-type concrete frame buildings. PhD thesis, University of California, Berkeley, USA.

Gall, G (2012) Industrial conflict in the engineering construction industry in Britain. Construction Management and Economics, 30(7), pp. 535-544. ISSN 1466433X

Gama, E C M and Sloan, S C W B (2010) Environmental sustainability in the construction industry in developing countries: A study of embodied energy of low-cost housing. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Gandy, C A (2024) Social equity in transportation infrastructure management: Quantitative methods for assessing and improving the distribution of public investments. PhD thesis, Carnegie Mellon University, USA.

Ganguly, K K; Padhy, R K and Rai, S S (2017) Managing the humanitarian supply chain: A fuzzy logic approach. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 521-536. ISSN 1759-5916

Ganiyu, S (2021) Developing a Bim-Knowledge (Bim-K) framework for improved decision-making in building construction projects. PhD thesis, London South Bank University, UK.

Gao, Q; Liu, B; Sun, J; Liu, C and Xu, Y (2022) Trade decomposition of CO2 emissions of global construction industries. Engineering, Construction and Architectural Management, 29(1), pp. 502-522. ISSN 0969-9988

Gao, Y; Casasayas, O; Wang, J and Xu, X (2023) Factors affecting the blockchain application in construction management in China: An ANP-SWOT hybrid approach. Architectural Engineering and Design Management, 19(6), pp. 665-680. ISSN 1745-2007

George, M and Loosemore, M (2019) Site operatives' attitudes towards traditional masculinity ideology in the Australian construction industry. Construction Management and Economics, 37(8), pp. 419-432. ISSN 01446193

Georgekutty, C K (2014) Optimization of construction cost in construction materials. Unpublished PhD thesis, Cochin University of Science and Technology, India.

Georgy, M and Basily, S Y (2008) Using genetic algorithms in optimizing construction material delivery schedules. Construction Innovation, 8(1), pp. 23-45. ISSN 1471-4175

Gerber, A and Crafford, G (2025) Shocking shortage: the electrical trade crisis in the Eastern Cape, South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 94-102. ISSN 17514304

Ghansah, F A and Lu, W (2025) Evaluating the critical resultant impacts of the COVID-19 pandemic on quality assurance of cross-border construction logistics and supply chain. Engineering, Construction and Architectural Management, 32(10), pp. 6665-6689. ISSN 0969-9988

Ghansah, F A and Lu, W (2025) Managerial framework for quality assurance of cross-border construction logistics and supply chain during pandemic and post-pandemic: Lessons from COVID-19 in the world’s factory. Engineering, Construction and Architectural Management, 32(5), pp. 3007-3056. ISSN 0969-9988

Ghansah, F A; Lu, W and Ababio, B K (2024) Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic. Engineering, Construction and Architectural Management, 31(5), pp. 2128-2150. ISSN 0969-9988

Gharaibeh, L.; Lantz, B. and Eriksson, K. M. (2026) Bridging the gap: A framework for monetizing BIM by integrating industry insights for informed decision-making. Smart and Sustainable Built Environment, 15(2), pp. 710-728. ISSN 2046-6099

Gharaibeh, L; Eriksson, K M; Lantz, B; Matarneh, S and Elghaish, F (2024) Toward digital construction supply chain-based industry 4.0 solutions: Scientometric-thematic analysis. Smart and Sustainable Built Environment, 13(1), pp. 42-62. ISSN 2046-6099

Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalized document management system to update highway operation and management systems using building information modeling. Journal of Construction Engineering and Management, 152(7): 04026090, ISSN 0733-9364

Ghosh, A (2015) Analyzing the impact of building information modeling (BIM) on labor productivity in retrofit construction: Case study at a semiconductor manufacturing facility. PhD thesis, Arizona State University, USA.

Ghosh, A; Parrish, K and Chasey, A D (2015) Implementing a vertically-integrated BIM curriculum in an undergraduate construction management program. International Journal of Construction Education and Research, 11(2), pp. 121-139. ISSN 1557-8771

Ghosh, B and Karmakar, S (2025) Development and application of a digitalized construction quality document management system for advanced construction using building information modeling. Journal of Construction Engineering and Management, 151(6): 04025053, ISSN 0733-9364

Gibson, G E (1990) Data integration and transfer methodologies in industrial construction. PhD thesis, Auburn University, USA.

Gil, N and Kahn, H (2004) Intelligent construction components for integrating product design, delivery process, and life-cycle performance. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gilham, A (2023) The relationship between customers’ satisfaction and trust in the global supply chain and profitability. DBA thesis, Walden University, USA.

Giorgi, Serena (2020) Circular economy and regeneration of building stock: Policy improvements, strategic partnerships and life cycle decision-making tools. PhD thesis, Politecnico di Milano, Italy.

Giritli, H; Sozen, Z; Flanagan, R and Lansley, P (1990) International contracting: A Turkish perspective. Construction Management and Economics, 8(4), pp. 415-430. ISSN 01446193

Goh, E and Loosemore, M (2017) The impacts of industrialization on construction subcontractors: A resource-based view. Construction Management and Economics, 35(5), pp. 288-304. ISSN 0144-6193

Goh, Y L (2004) The effect of higher workers' compensation premium rates on construction worker wages and the reporting of injuries. PhD thesis, University of Utah, USA.

Golden, S K (2008) Immigration and construction: An analysis of the impact of immigration on construction project costs. PhD thesis, University of Maryland, College Park, USA.

Goldenberg, M and Shapira, A (2007) Systematic evaluation of construction equipment alternatives: Case study. Journal of Construction Engineering and Management, 133(1), pp. 72-85. ISSN 0733-9364

Gong, X (2019) Vertical integration and reputation: the case of real estate companies. PhD thesis, University of Hong Kong, Hong Kong.

Gosling, J (2011) Flexibility strategies for engineer-to-order construction supply chains. PhD thesis, Cardiff University, UK.

Gosling, J; Naim, M and Towill, D (2013) Identifying and categorizing the sources of uncertainty in construction supply chains. Journal of Construction Engineering and Management, 139(1), pp. 102-110. ISSN 0733-9364

Gosling, J; Naim, M; Towill, D; Abouarghoub, W and Moone, B (2015) Supplier development initiatives and their impact on the consistency of project performance. Construction Management and Economics, 33(5-6), pp. 390-403. ISSN 01446193

Gosling, J and Naim, M M (2009) Coping with project uncertainty in construction supply chains. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Goswami, M; Singh, J and Kumar, V (2016) An enterprise based decision support system for engineering aggregate selection: A case study. Journal of Engineering, Design and Technology, 14(4), pp. 851-873.

Goto, Y (2012) Sustainable wooden building concept for central Japan. DSc thesis, ETH Zürich, Switzerland.

Grabham, S and Manu, E (2022) Diffusion of platform thinking as an innovation in the construction supply chain. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(3), pp. 119-130. ISSN 17514304

Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, G (2016) Factors influencing and risk associated with the use of drones by specialty construction companies in the United States of America. PhD thesis, Indiana State University, USA.

Graham, L D; Smith, S D and Dunlop, P (2005) Lognormal distribution provides an optimum representation of the concrete delivery and placement process. Journal of Construction Engineering and Management, 131(2), pp. 230-238. ISSN 0733-9364

Grahn, Karin (2023) Occupational exposure to particles in relation to chronic obstructive pulmonary disease and cardiovascular disease. PhD thesis, Karolinska Institutet, Sweden.

Greed, C (1997) Cultural change in construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Green, S D; Fernie, S and Weller, S (2005) Making sense of supply chain management: A comparative study of aerospace and construction. Construction Management and Economics, 23(6), pp. 579-593. ISSN 01446193

Green, S D and May, S C (2003) Re-engineering construction: Going against the grain. Building Research & Information, 31(2), pp. 97-106. ISSN 0961-3218

Greenwood, D (2001) Subcontract procurement: are relationships changing? Construction Management and Economics, 19(1), pp. 5-7. ISSN 01446193

Greenwood, D; Hogg, K and Kan, S (2005) Subcontractors' liability for project delay. Journal of Financial Management of Property and Construction, 10(2), pp. 107-114. ISSN 1366-4387

Gremyr, I; Bäckstrand, J; Fredriksson, A; Gatenholm, G and Halldórsson, Á (2023) Blueprinting construction logistics services for quality improvement. Construction Management and Economics, 41(1), pp. 60-78. ISSN 01446193

Griffey, T (2011) Black power's labor politics: The united construction workers association and Title VII law in the 1970s. PhD thesis, University of Washington, USA.

Griffis, F H and Butler, M (1988) Case for cost-plus contracting. Journal of Construction Engineering and Management, 114(1), pp. 83-94. ISSN 0733-9364

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.

Grover, R; Walacik, M; Buzu, O; Gunes, T; Raskovic, M and Yildiz, U (2019) Barriers to the use of property taxation in municipal finance. Journal of Financial Management of Property and Construction, 24(2), pp. 166-183. ISSN 1366-4387

Gruneberg, S and Ive, G (2002) The relationship between the aggregate annual wage bills of heating and ventilation contractors, heating and ventilation industry output and construction industry output. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Gruneberg, Stephen Louis (2001) The growth and survival of firms in the heating and ventilating industry. PhD thesis, University College London, UK.

Guan, Z; Samarasinghe, D A S; Yiu, T W; Reddy, R and Laird, I (2026) Examining the risk factors influencing safety outcomes for Chinese migrant construction workers in New Zealand. Engineering, Construction and Architectural Management, 33(15), pp. 182-202. ISSN 0969-9988

Guenther, P (2020) A case study of perceptions of asset tracking and inventory management technology in a small construction company. PhD thesis, Wilmington University (Delaware), USA.

Guevara, M; Guevara, J; Vargas, H and Ozuna, A (2011) Promoting good design management practices in colombian construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gultekin, P (2015) An integrated process model and decision support system for energy efficient retrofits. PhD thesis, Pennsylvania State University, USA.

Gunarathna, C; Yang, R J; Jayasuriya, S; Yi, X; Arashpour, M; Ning, X and Heng, X (2026) Design and development of blockchain-enabled information management system for building integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(15), pp. 72-114. ISSN 0969-9988

Gunasekera, S (2013) The development of a framework for assessing the integration of construction supply chains. PhD thesis, Ulster University, UK.

Gunning, J G (2000) Models of customer satisfaction and service quality as research instruments in construction management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Gupta, J P (1966) Building site activity: An input/output model. PhD thesis, University of Manchester, UK.

Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.

Gupta, P and Elhag, T (2025) Applicability of lean techniques and processes on improving sustainability in construction projects. Built Environment Project and Asset Management, 15(2), pp. 247-270. ISSN 2044-124X

Gurjao, S (2010) Inclusivity: understanding the careers of women in the construction industry. PhD thesis, University of Reading, UK.

Gutierrez-Bucheli, L.; Muñoz, S.; Couper, R. and Maxwell, D. W. (2026) Mapping the landscape of productivity in construction research: An umbrella review of trends, gaps and future directions. Engineering, Construction and Architectural Management, 33(15), pp. 516-539. ISSN 0969-9988

Guven, G and Ergen, E (2021) Tracking major resources for automated progress monitoring of construction activities: Masonry work case. Construction Innovation, 21(4), pp. 648-667. ISSN 1471-4175

Gyadu-Asiedu, Nana Akua Asabea; Aigbavboa, Clinton and Stephen, Seyi (2026) Nature-based solutions and materials promoting net-zero construction in South Africa: Trends and insights from a bibliometric review. Journal of Construction Business and Management, 8(2), pp. 28-42. ISSN 2521-0165

Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Unlocking productivity: Revealing waste and hidden disturbances impacting mep workers. Journal of Construction Engineering and Management, 150(9): 04024108, ISSN 0733-9364

Haas, T C; Rodriguez, A M; Glover, R and Goodrum, P M (2001) Implementing a multiskilled workforce. Construction Management and Economics, 19(6), pp. 633-641. ISSN 01446193

Haglund, P; Rudberg, M and Sezer, A A (2022) Organizing logistics to achieve strategic fit in building contractors: A configurations approach. Construction Management and Economics, 40(9), pp. 711-726. ISSN 01446193

Haidar, A; Naoum, S; Howes, R and Tah, J (1999) Genetic algorithms application and testing for equipment selection. Journal of Construction Engineering and Management, 125(1), pp. 32-38. ISSN 0733-9364

Hailu, H and Tshehla, M (2025) A conceptual framework for enhancing subcontracting performance in the construction industry of developing countries. Journal of Construction Business and Management, 7(2), pp. 1-15.

Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.

Hall, D M (2017) The early stages of integrated project delivery: Institutionalization and impact on adoption of systemic innovations. PhD thesis, Stanford University, USA.

Hall, D M; Whyte, J K and Lessing, J (2020) Mirror-breaking strategies to enable digital manufacturing in Silicon Valley construction firms: A comparative case study. Construction Management and Economics, 38(4), pp. 322-339. ISSN 01446193

Hall, M A (2001) 'Root' cause analysis: A tool for closer supply chain integration in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hallowell, M (2010) Cost-effectiveness of construction safety programme elements. Construction Management and Economics, 28(1), pp. 25-34. ISSN 1466433X

Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.

Hallowell, M R and Gambatese, J A (2009) Construction safety risk mitigation. Journal of Construction Engineering and Management, 135(12), pp. 1316-1323. ISSN 0733-9364

Halman, J I M and Voordijk, J T (2012) Balanced framework for measuring performance of supply chains in house building. Journal of Construction Engineering and Management, 138(12), pp. 1444-1450. ISSN 0733-9364

Hamdan, Azreen Sharina (2025) Developing a tailored framework for digital transformation in UK small, micro and medium construction enterprises: Evidence from greater manchester. PhD thesis, University of Salford, UK.

Hamida, A; Alsudairi, A; Alshaibani, K and Alshamrani, O (2022) Parametric study of the impact of building envelope systems on embodied and operational carbon of residential buildings. International Journal of Building Pathology and Adaptation, 40(5), pp. 753-774. ISSN 23984708

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(8), pp. 756-772. ISSN 01446193

Hammad, A W A; Akbarnezhad, A; Rey, D and Waller, S T (2016) A computational method for estimating travel frequencies in site layout planning. Journal of Construction Engineering and Management, 142(5): 04015102, ISSN 0733-9364

Hammad, A W A; Chen, Z; Alkilani, S and Loosemore, M (2023) Looking for meaningful work in the architecture, engineering, and construction industry: A structural equation modelling analysis of refugee and migrant work-seeking experiences. Journal of Construction Engineering and Management, 149(7): 04023043, ISSN 0733-9364

Hammond, D; Dempsey, J J; Szigeti, F and Davis, G (2005) Integrating a performance-based approach into practice: A case study. Building Research & Information, 33(2), pp. 128-141. ISSN 0961-3218

Hampson, K and Kwok, T (1997) Strategic alliances in building construction: a tender evaluation tool for the public sector. Journal of Construction Procurement, 3(1), pp. 28-41. ISSN 1358-9180

Han, W; Xu, L; Mouri, M M; Loh, W Y; Dai, F and Zhu, Z (2025) Drone flights and worker visual attention: A quantitative study of distraction and hazard awareness. Journal of Construction Engineering and Management, 151(11): 04025173, ISSN 0733-9364

Han, Y; Yan, X and Piroozfar, P (2023) An overall review of research on prefabricated construction supply chain management. Engineering, Construction and Architectural Management, 30(10), pp. 5160-5195. ISSN 0969-9988

Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364

Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(5), pp. 379-386. ISSN 0961-3218

Hare, B; Cameron, I; Real, K J and Maloney, W F (2013) Exploratory case study of pictorial aids for communicating health and safety for migrant construction workers. Journal of Construction Engineering and Management, 139(7), pp. 818-825. ISSN 0733-9364

Harison, J C (1993) Laboring class, dangerous class, insurgent class: The Paris building trades, 1830-1871. PhD thesis, University of Iowa, USA.

Hartenberger, U; Lorenz, D and Lützkendorf, T (2013) A shared built environment professional identity through education and training. Building Research & Information, 41(1), pp. 60-76. ISSN 0961-3218

Hartmann, A; Ling, F Y Y and Tan, J S H (2009) Relative importance of subcontractor selection criteria: Evidence from Singapore. Journal of Construction Engineering and Management, 135(9), pp. 826-832. ISSN 0733-9364

Hasheminasab, S and Kashi, E (2021) Finite element analysis of ports pavement under container loading. Journal of Engineering, Design and Technology, 19(2), pp. 497-508. ISSN 1726-0531

Hassan, A; Purnomo, M R A and Anugerah, A R (2020) Fuzzy-analytical-hierarchy process in failure mode and effect analysis (FMEA) to identify process failure in the warehouse of a cement industry. Journal of Engineering, Design and Technology, 18(2), pp. 378-388. ISSN 1726-0531

Hassan, M (2010) Evaluation of the environmental and economic impacts of warm-mix asphalt using life-cycle assessment. International Journal of Construction Education and Research, 6(3), pp. 238-250. ISSN 1557-8771

Hassanein, A and Melin, J (1997) Crew design methodology for construction contractors. Journal of Construction Engineering and Management, 123(3), pp. 203-207. ISSN 0733-9364

Hassler, U (2009) Long-term building stock survival and intergenerational management: The role of institutional regimes. Building Research & Information, 37(5-6), pp. 552-568. ISSN 0961-3218

Hatmoko, J U D (2008) The impact of supply chain management practice on construction project performance. PhD thesis, University of Newcastle upon Tyne, UK.

Hatmoko, J U D and Scott, S (2010) Simulating the impact of supply chain management practice on the performance of medium-sized building projects. Construction Management and Economics, 28(1), pp. 35-49. ISSN 1466433X

Heaton, R; Martin, H; Chadee, A; Milling, A; Dunne, S and Borthwick, F (2022) The construction materials conundrum: Practical solutions to address integrated supply chain complexities. Journal of Construction Engineering and Management, 148(8): 04022071, ISSN 0733-9364

Hedayati, M; Iyer-Raniga, U and Crossin, E (2014) A greenhouse gas assessment of a stadium in Australia. Building Research & Information, 42(5), pp. 602-615. ISSN 0961-3218

Hedborg Bengtsson, S (2019) Coordinated construction logistics: An innovation perspective. Construction Management and Economics, 37(5), pp. 294-307. ISSN 01446193

Herabat, P (1997) A functional specification for a decision support system to select bridge analysis tools. PhD thesis, Carnegie Mellon University, USA.

Heravi, G; Kebria, M F and Rostami, M (2021) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(1), pp. 174-195. ISSN 0969-9988

Hernandez, B J (2012) Erosion of German industrial relations? Evidence from the metalworking, chemicals and construction sectors. PhD thesis, City University of New York, USA.

Herzog, H W and Schlottmann, A M (1988) Local business cycle severity and induced labour mobility: The case of the construction workforce. Construction Management and Economics, 6(3), pp. 247-258. ISSN 01446193

Hewage, K N (2007) Construction productivity improvement by worker motivation and it based communication. PhD thesis, University of Calgary, Canada.

Hewavitharana, S; Perera, A; Perera, S; Perera, P and Nanayakkara, S (2025) Framework for systematic adoption of ERP systems in the Sri Lankan construction industry. Built Environment Project and Asset Management, 15(3), pp. 629-646. ISSN 2044-124X

Hijazi, A A; Das, P; Li, Y; Moehler, R C and Maxwell, D W (2026) A contingency approach to platform implementation: Platform types, attributes, and value chain integration. Building Research & Information, 54(1), pp. 4-23. ISSN 0961-3218

Hijazi, A A; Perera, S; Calheiros, R N and Alashwal, A (2021) Rationale for the integration of BIM and blockchain for the construction supply chain data delivery: A systematic literature review and validation through focus group. Journal of Construction Engineering and Management, 147(10): 03121005, ISSN 0733-9364

Hijazi, A A; Perera, S; Calheiros, R N and Alashwal, A (2023) A data model for integrating BIM and blockchain to enable a single source of truth for the construction supply chain data delivery. Engineering, Construction and Architectural Management, 30(10), pp. 4645-4664. ISSN 0969-9988

Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(2), pp. 139-151. ISSN 1557-8771

Hill, C and Ainsworth, A (2001) Health and safety: Academic research and practical application. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hinkel, M P (2022) Three essays on labor market regulation in the American construction industry. PhD thesis, Michigan State University, USA.

Hinze, J and Tracey, A (1994) The contractor-subcontractor relationship: The subcontractor's view. Journal of Construction Engineering and Management, 120(2), pp. 274-287. ISSN 0733-9364

Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains. PhD thesis, University of Washington, USA.

Ho, P H K (2016) Labour and skill shortages in Hong Kong's construction industry. Engineering, Construction and Architectural Management, 23(4), pp. 533-550. ISSN 0969-9988

Holmen, E; Veen, B v d and Dorée, A G (2002) Inter-organizational relationships in construction: Present lack of consensus and inspiration for further research. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Holmes, Matthew Ian (2013) The application of structural contingency theory to supply chain management: Developing a strategic model for prefabricated timber systems. PhD thesis, University of Technology Sydney, Australia.

Hong Loh, W and Ofori, G (2000) Effect of registration on performance of construction subcontractors in Singapore. Engineering, Construction and Architectural Management, 7(1), pp. 29-40. ISSN 0969-9988

Hong-minh, S M T (2002) Re-engineering the UK private house building supply chain. PhD thesis, University of Wales College of Cardiff, UK.

Horgan, I (2014) The influence of an online collaboration tool on relationships in inter-organisational networks. PhD thesis, Victoria University, Australia.

Horman, M J and Thomas, H R (2005) Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management, 131(7), pp. 834-843. ISSN 0733-9364

Horman, Michael J (2000) Process dynamics: Buffer management in building project operations. PhD thesis, University of Melbourne, Australia.

Hosseini, M R; Banihashemi, S; Chileshe, N; Namzadi, M O; Udaeja, C; Rameezdeen, R and McCuen, T (2016) BIM adoption within Australian small and medium-sized enterprises (SMEs): An innovation diffusion model. Construction Economics and Building, 16(3), pp. 71-86. ISSN 2204-9029

Hosseinian, S M and Jaberi, A (2024) Optimal sharing of construction project outcomes with downstream contracting parties: Principal-agent analysis. Journal of Construction Engineering and Management, 150(2): 04023156, ISSN 0733-9364

Hosseinian, S M and Jaberi, A (2025) Optimizing the distribution of outcomes across multiple levels of subcontracting in construction projects. Engineering, Construction and Architectural Management, 32(2), pp. 1278-1302. ISSN 0969-9988

Hou, K; Guan, X; Wang, H; Hu, S; Lu, M and Liu, N (2024) Influence of functional boundary for corridor spaces in elderly facilities in China. Building Research & Information, 52(6), pp. 658-679. ISSN 0961-3218

Hsieh, T Y (1998) Impact of subcontracting on site productivity: Lessons learned in Taiwan. Journal of Construction Engineering and Management, 124(2), pp. 91-100. ISSN 0733-9364

Hsieh, T-Y (1993) Functional requirements for large-scale manipulators in industrial construction. PhD thesis, University of Texas at Austin, USA.

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.

Hu, Chengdi (2023) Essays on labor market and college education in China. PhD thesis, University of Rochester, USA.

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.

Huang, J; Abadi, M and Yeow, J (2022) Exploring dynamics in construction circular supply chains using a systematic literature review: New supply-push and demand-pull perspectives. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Huang, J; Abadi, M and Yeow, J (2023) Policies for the transition to circular construction: A systematic literature review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Huang, J; Abadi, M and Yeow, J (2024) Policy implications for factors of steel reuse in circular construction supply chains: A system thinking perspective. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Huang, P-D (1988) Impact of CADD technology on the architectural community. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Huang, R Y (2006) A performance-based bridge LCCA model using visual inspection inventory data. Construction Management and Economics, 24(10), pp. 1069-1081. ISSN 1466433X

Hui, K J (2008) Court decisions on building contract disputes: a Coasian empirical analysis. PhD thesis, University of Hong Kong, Hong Kong.

Huni, Tendai (2025) Social power configurations influencing relationship strength and supplier performance in the construction industry. PhD thesis, Vaal University of Technology, South Africa.

Hussain, R S (2017) Investigating the business process implications of managing road works and street works. PhD thesis, Loughborough University, UK.

Hussein, M; Darko, A; Eltoukhy, A E E and Zayed, T (2022) Sustainable logistics planning in modular integrated construction using multimethod simulation and taguchi approach. Journal of Construction Engineering and Management, 148(6): 04022022, ISSN 0733-9364

Huynh, H T (2021) Game theory applications in construction project management. PhD thesis, Catholic University of America, USA.

Höök, M and Stehn, L (2014) Exploring the management of multiple business models in one company. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ibbotson, K and Farrell, P (2019) The challenges of prioritising low carbon in public sector flood and coastal erosion risk management (FCERM) construction. International Journal of Building Pathology and Adaptation, 37(5), pp. 615-628. ISSN 23984708

Ibbs, C W and Terveer, K R (1984) Integrated construction preventive maintenance system. Journal of Construction Engineering and Management, 110(1), pp. 43-59. ISSN 0733-9364

Infante-Perea, M; Román-Onsalo, M and Navarro-Astor, E (2025) Occupational alternatives in Spanish building engineering: A gender perspective. Journal of Engineering, Design and Technology, 23(6), pp. 2005-2022. ISSN 1726-0531

Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks. PhD thesis, University of Alberta, Canada.

Isaac, S and Navon, R (2008) Feasibility study of an automated tool for identifying the implications of changes in construction projects. Journal of Construction Engineering and Management, 134(2), pp. 139-145. ISSN 0733-9364

Ismail, F; Ruikar, K D; Carrillo, P and Anumba, C J (2009) Technology transfer in construction: Learning from the manufacturing industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Isuri Anuradha, A; Soorige, D and Geekiyanage, D (2021) Comparative study on life cycle assessment of buildings in developed countries and Sri Lanka. Built Environment Project and Asset Management, 11(2), pp. 304-329. ISSN 2044-124X

Itoya, E (2012) Carbon emissions evaluation for highway management and maintenance. EngD thesis, Loughborough University, UK.

Ivanoff, D J and Diekmann, J E (1989) Project-labor agreements in construction industry. Journal of Construction Engineering and Management, 115(4), pp. 567-584. ISSN 0733-9364

Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.

Jackson, R M (1981) "A right to a job": A sociological history of carpentry and printing craft labor markets in the United States. PhD thesis, University of California, Berkeley, USA.

Jaenglom, Kamonmarn (2014) Exploring construction supply chain management: A systematic perspective for creating sustainable performance. PhD thesis, Università degli Studi di Bergamo, Italy.

Jafari, A (2018) A decision-making framework for the selection of sustainable alternatives for energy-retrofits. PhD thesis, University of New Mexico, USA.

Jain, M and Rawal, R (2022) Emissions from a net-zero building in India: Life cycle assessment. Buildings & Cities, 3(1), pp. 398-416. ISSN 2632-6655

Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.

Jallow, A K; Demian, P; Baldwin, A and Anumba, C (2008) Life cycle approach to requirements information management in construction projects: State-of-the-art and future trends. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning. PhD thesis, University of Wisconsin - Madison, USA.

Jang, W; Yu, G; Jung, W; Kim, D and Han, S H (2018) Financial conflict resolution for public-private partnership projects using a three-phase game framework. Journal of Construction Engineering and Management, 144(3): 05017022, ISSN 0733-9364

Janné, M (2020) Construction logistics in a city development setting. PhD thesis, Linköping University, Sweden.

Janné, M and Fredriksson, A (2019) Construction logistics governing guidelines in urban development projects. Construction Innovation, 19(1), pp. 89-109. ISSN 1471-4175

Jansson, G; Lundkvist, R and Olofsson, T (2015) The role of experience feedback channels in the continuous development of house-building platforms. Construction Innovation, 15(2), pp. 236-255. ISSN 1471-4175

Jarkas, A M (2012) Factors influencing power-trowelling productivity of concrete surface floors. Journal of Engineering, Design and Technology, 10(1), pp. 34-51. ISSN 1726-0531

Jarkas, A M and Bitar, C G (2014) Factors affecting construction labor productivity in Kuwait. Journal of Construction Engineering and Management, 138(7), pp. 811-820. ISSN 0733-9364

Jarkas, A M and Horner, R M W (2015) Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. Construction Management and Economics, 33(8), pp. 625-639. ISSN 01446193

Jaskula, K; Kifokeris, D; Papadonikolaki, E and Rovas, D (2025) Blockchain-based decentralized common data environment: User requirements and conceptual framework. Journal of Construction Engineering and Management, 151(9): 04025112, ISSN 0733-9364

Jaskula, Klaudia (2024) Blockchain-enabled CBIM for lifecycle data provenance. PhD thesis, University College London, UK.

Javed, A A; Lam, P T I and Chan, A P C (2014) Change negotiation in public-private partnership projects through output specifications: An experimental approach based on game theory. Construction Management and Economics, 32(4), pp. 323-348. ISSN 01446193

Jayarathna, H S N M; Perera, B A K S; Atapattu, D and Rodrigo, N (2025) Circular economy and blockchain-integrated road map to improve construction waste management. Construction Innovation, 25(7), pp. 23-49. ISSN 1471-4175

Jayasinghe, R S; Rameezdeen, R and Chileshe, N (2023) Modelling the cause and effect relationship risks in reverse logistics supply chains for demolition waste. Engineering, Construction and Architectural Management, 30(9), pp. 4018-4044. ISSN 0969-9988

Jayawardane, A K W and Gunawardena, N B (1998) Construction workers in developing countries: A case study of Sri Lanka. Construction Management and Economics, 16(5), pp. 521-530. ISSN 01446193

Jayesh, M P (2020) Inter-state migration for employment in India: a study on construction workers in Kerala. PhD thesis, Indian Institute of Technology Delhi, India.

Jenkins, A W (1984) Social policy and construction wage formation: The Alberta experience. Construction Management and Economics, 2(1), pp. 25-36. ISSN 01446193

Jens, K and Gregg, J S (2022) Building performances in open and enclosed spaces: A method for balancing operational costs and space utilization with a focus on user needs and satisfaction. Architectural Engineering and Design Management, 18(2), pp. 149-164. ISSN 1745-2007

Jeong, J G (2006) A framework for supply chain modeling and optimization for the manufactured housing industry. PhD thesis, Purdue University, USA.

Jervis, E K (2015) Lowering CO2 emissions: a framework for overcoming institutional pressures and diffusing low carbon strategy throughout the construction supply chain. PhD thesis, University of Liverpool, UK.

Jesson, J K (1988) Ethnic minority builders: a comparative study of Britain and the United States of America on affirmative action in the building industry. PhD thesis, Aston University, UK.

Jewell, C (2006) Informal employment: A threat or an opportunity for the UK construction sector? In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Risk allocation model for price escalations in construction projects: Integrating bargaining game theory and probabilistic Bayesian modeling. Journal of Construction Engineering and Management, 151(9): 04025134, ISSN 0733-9364

Jia, A. Y. and Luk, C. W. (2026) From techno-optimism to value co-creation: A circular value system analysis on the modular transitional housing programme in Hong Kong. Construction Management and Economics, 44(7), pp. 537-563. ISSN 0144-6193

Jia, A Y; Gao, S S and Kvan, T (2017) Markets, professions and firms of the construction industry: The changing roles of architects in response to vertical integration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Jia, Y A; Rowlinson, S; Kvan, T; Lingard, H C and Yip, B (2009) Burnout among Hong Kong Chinese architecture students: The paradoxical effect of Confucian conformity values. Construction Management and Economics, 27(3), pp. 287-298. ISSN 1466433X

Jiang, W.; Wang, A.; Tao, M.; Ni, F. and Zhang, L. (2026) Collaborative emission reduction behavior in the construction supply chain with incentive mechanism: A tripartite evolutionary game analysis. Engineering, Construction and Architectural Management, pp. 1-33. ISSN 0969-9988

Jiang, A (2005) A decision support model for cost and activity-based performance measurement in steel construction. PhD thesis, University of Florida, USA.

Jin, F; Xiang, W; Ji, Z and Zhang, B (2023) Quantifying the evolutionary mechanism of COVID-19 impact on international construction multi-projects: A risk driver perspective. Engineering, Construction and Architectural Management, 30(8), pp. 3602-3619. ISSN 0969-9988

Jin, H; Liu, S; Li, J and Liu, C (2020) A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs. International Journal of Construction Management, 20(6), pp. 642-652. ISSN 1562-3599

Jin, H; Liu, S; Li, J and Liu, C (2023) Determination of government guarantee and revenue cap in public-private partnership contracts. Engineering, Construction and Architectural Management, 30(2), pp. 393-414. ISSN 0969-9988

Johannes, K; Voordijk, H and Aranda-Mena, G (2023) The role of purchasing in raising the maturity of smart maintenance management. Built Environment Project and Asset Management, 13(2), pp. 324-340. ISSN 2044-124X

Johnson, P (2002) A quantitative assessment of knowledge and perceptions of civil engineering. PhD thesis, Purdue University, USA.

Jones, J W (2008) Wayfinding: A grounded theory study of the information-seeking behavior of constructors. DEd thesis, Ball State University, USA.

Jones, S M; Ross, A and Sertyesilisik, B (2010) Testing the unfolding model of voluntary turnover on construction professionals. Construction Management and Economics, 28(3), pp. 271-285. ISSN 1466433X

Jonker-Hoffrén, P (2023) Policy tensions in demolition: Dutch social housing and circularity. Buildings & Cities, 4(1), pp. 405-421. ISSN 2632-6655

Jonnalagadda, S (2016) Artificial neural networks, non linear auto regression networks (NARX) and causal loop diagram approaches for modelling bridge infrastructure conditions. PhD thesis, Clemson University, USA.

Josephson, P E and Chao, M (2014) Use and non-use of time in construction of new multi-dwelling buildings in Sweden. International Journal of Construction Management, 14(1), pp. 28-35. ISSN 1562-3599

Jouma, H; Mansor, M; Abd Rahman, M S; Yong, Y and Mokhlis, H (2025) Influence of the demand side management on the daily performance of microgrids in smart environments using grey wolf optimizer. Smart and Sustainable Built Environment, 14(6), pp. 1795-1823. ISSN 2046-6099

Jung, S-K (1993) A study of single-family residential construction activity: Simultaneous transfer function (STF) analysis. PhD thesis, Georgia State University, USA.

Junnila, S (2004) The environmental impact of an office building throughout its life cycle. PhD thesis, Helsinki University of Technology, Finland.

Junussova, T. and Nadeem, A. (2026) Modelling sustainable construction material management implementation strategy indicators in developed economies. International Journal of Construction Management, 26(9), pp. 1925-1943. ISSN 1562-3599

Kaatz, E; Root, D and Bowen, P (2005) Broadening project participation through a modified building sustainability assessment. Building Research & Information, 33(5), pp. 441-454. ISSN 0961-3218

Kaboli, A S and Carmichael, D G (2014) Truck dispatching and minimum emissions earthmoving. Smart and Sustainable Built Environment, 3(2), pp. 170-186. ISSN 2046-6099

Kaboli, Alireza (2014) Cost and emissions analysis of earthmoving operations. PhD thesis, University of New South Wales, Australia.

Kadan, R; Omotayo, T S; Boateng, P; Nani, G and Wilson, M (2024) The application of Bayesian network analysis in demystifying construction project subcontracting complexities for developing countries. Journal of Financial Management of Property and Construction, 29(3), pp. 444-469. ISSN 1366-4387

Kadan, R and Wium, J (2025) Fuzzy synthesis analysis of social network risk factors in supply chains of African megaprojects. Built Environment Project and Asset Management, 15(1), pp. 125-148. ISSN 2044-124X

Kamara, J M; Anumba, C J and Evbuomwan, N F O (2000) Establishing and processing client requirements: A key aspect of concurrent engineering in construction. Engineering, Construction and Architectural Management, 7(1), pp. 15-28. ISSN 0969-9988

Kanai, Júlia (2025) Systematic management model based on lean construction through a mobile app for industrialized buildings in the frame system. PhD thesis, Universidade Estadual de Campinas, Brazil.

Kangari, R and Halpin, D W (1989) Potential robotics utilization in construction. Journal of Construction Engineering and Management, 115(1), pp. 126-143. ISSN 0733-9364

Kangari, R and Halpin, D W (1990) Identification of factors influencing implementation of construction robotics. Construction Management and Economics, 8(1), pp. 89-104. ISSN 01446193

Kappia, J G; Dainty, A R J and Price, A D F (2006) Using qualitative methods to explore career development for construction operatives. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.

Kar, S and Jha, K N (2021) Investigation into lead time of construction materials and influencing factors. Journal of Construction Engineering and Management, 147(3): 01998, ISSN 0733-9364

Karaa, F A and Nasr, A Y (1986) Resource management in construction. Journal of Construction Engineering and Management, 112(3), pp. 346-357. ISSN 0733-9364

Karambakuwa, N (2024) The performance of small construction firms in South Africa under the cost leadership strategy. PhD thesis, Nelson Mandela University, South Africa.

Karim, J A; Demian, P; Baldwin, A and Anumba, C (2014) An empirical study of the complexity of requirements management in construction projects. Engineering, Construction and Architectural Management, 21(5), pp. 505-531. ISSN 0969-9988

Karim, K; Marosszeky, M and Davis, S (2006) Managing subcontractor supply chain for quality in construction. Engineering, Construction and Architectural Management, 13(1), pp. 27-42. ISSN 0969-9988

Karimi, H (2017) Quantitative analysis of the impact of craft labor availability on construction project performance. PhD thesis, University of Kentucky, USA.

Karimi, H; Taylor, T R B and Goodrum, P M (2017) Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. Construction Management and Economics, 35(6), pp. 368-380. ISSN 01446193

Karimidorabati, S; Haas, C T and Gray, J (2016) Evaluation of automation levels for construction change management. Engineering, Construction and Architectural Management, 23(5), pp. 554-570. ISSN 0969-9988

Kashiwagi, D T (1991) Development of a performance based design/procurement system for nonstructural facility systems. PhD thesis, Arizona State University, USA.

Kashiwagi, D T; Slater, C and Kashiwagi, M (2002) 'Just in time' information for performance based systems. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kasim, N B (2008) Improving materials management on construction projects. PhD thesis, Loughborough University, UK.

Kasprzak, C and Dubler, C (2012) Aligning BIM with FM: Streamlining the process for future projects. Construction Economics and Building, 12(4), pp. 68-77. ISSN 2204-9029

Kassa, R; Ogundare, I; Lines, B; Smithwick, J B; Kepple, N J and Sullivan, K T (2025) Developing a construct to measure contractor project manager performance competencies. Engineering, Construction and Architectural Management, 32(3), pp. 2003-2021. ISSN 0969-9988

Kassim, Y H (2012) Information technology business value model for engineering and construction industry. PhD thesis, University of Salford, UK.

Kašpar, H M P (2022) Robert Adam and networks for building in eighteenth-century Britain. PhD thesis, University of Leeds, UK.

Kavaarpuo, Godwin (2022) Transaction costs and entrepreneurial discovery in house building innovations: A study of developers' behaviour in Ghana. PhD thesis, University of Melbourne, Australia.

Keane, C (2012) Essays in social policy and labour economics. PhD thesis, University College Dublin, Ireland.

Kedir, F; Hall, D M; Brantvall, S; Lessing, J; Hollberg, A and Soman, R K (2024) Circular information flows in industrialized housing construction: The case of a multi-family housing product platform in Sweden. Construction Innovation, 24(5), pp. 1354-1379. ISSN 1471-4175

Kedir, F N (2022) The performance and potential of industrialized construction for resource-efficient housing construction: A multi-scalar approach across product, system, and context. DSc thesis, ETH Zürich, Switzerland.

Keeter, E H (1985) The development of a task inventory for baccalaureate programs in construction management (education, curriculum). PhD thesis, Texas A&M University, USA.

Keskin, F S (2021) Integration of lifecycle assessment into structural intervention scenarios for assessing environmental impacts of vulnerable buildings. PhD thesis, University of Birmingham, UK.

Keskiniva, K; Saari, A and Junnonen, J M (2023) Suggestions for takt production subcontract clauses: A conceptual study. Construction Innovation, 23(2), pp. 425-442. ISSN 1471-4175

Khalfan, M; McDermott, P and Cooper, R (2004) Integrating the supply chain within construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Khalfan, M M A; Anumba, C J and Carrillo, P M (2001) Concurrent engineering readiness assessment of sub-contractors within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Khalfan, M M A and McDermott, P (2006) Once unthought, now the best practice within the construction sector. Journal of Construction Procurement, 12(1),

Khalfan, M M A; McDermott, P and Maqsood, T (2005) Achieving supply chain integration through demand and supply management. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Khodabocus, S and Seyis, S (2024) Multi-criteria decision-making model for risk management in modular construction projects. International Journal of Construction Management, 24(2), pp. 240-250. ISSN 1562-3599

Kifokeris, D and Tezel, A (2025) Blockchain and lean construction: An exploration of bidirectional synergies and interactions. Architectural Engineering and Design Management, 21(1), pp. 171-189. ISSN 1745-2007

Killingsworth, J; Mehany, M H and Ladhari, H (2021) General contractors’ experience using off-site structural framing systems. Construction Innovation, 21(1), pp. 40-63. ISSN 1471-4175

Killip, G (2020) A reform agenda for UK construction education and practice. Buildings & Cities, 1(1), pp. 525-537. ISSN 2632-6655

Kim, J (2007) Health insurance and workers' retention in the construction industry. PhD thesis, University of Utah, USA.

Kim, J and Philips, P (2014) Remuneration and absenteeism on a large construction site. Construction Management and Economics, 32(10), pp. 983-999. ISSN 01446193

Kim, M (2017) Noncontact quality assessment of precast concrete elements using 3D laser scanning and building information modeling. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Kim, S Y and Nguyen, V T (2022) Supply chain management in construction: Critical study of barriers to implementation. International Journal of Construction Management, 22(16), pp. 3148-3157. ISSN 1562-3599

Kim, Y W and Ballard, G (2002) Earned value method and customer earned value. Journal of Construction Research, 3(1), pp. 55-66. ISSN 1609-9451

Kiziltas, S; Dikmen, I and Birgonul, M T (2003) Organizational effectiveness in construction: A conceptual framework. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Koc, K; Durdyev, S; Tleuken, A; Ekmekcioglu, O; Mbachu, J and Karaca, F (2024) Critical success factors for construction industry transition to circular economy: Developing countries' perspectives. Engineering, Construction and Architectural Management, 31(12), pp. 4955-4974. ISSN 0969-9988

Koch, C and Bertelsen, N H (2014) Changing institutions of knowing: Climate mitigation, craft competences and vocational training in Denmark. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Koch, C and Larsen, C S (2006) Quality in construction: A supply chain perspective. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kohler, N (2002) The relevance of bequest: An observer's perspective. Building Research & Information, 30(2), pp. 130-138. ISSN 0961-3218

Kolawole, O M (2023) A model for improving ethics in construction materials and products supply chain using blockchain. PhD thesis, London South Bank University, UK.

Konukcu, S (2011) A knowledge chain framework for construction supply chains. PhD thesis, Loughborough University, UK.

Koolwijk, J; van Oel, C; Vrijhoef, R and Wamelink, J W F (2015) Partnering in construction: A field study to further develop the framework of supply chain integration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Koolwijk, J S J (2022) Rules, power and trust: Interplay between inter-organizational structures and interpersonal relationships in project-based organizations in the construction industry. PhD thesis, Delft University of Technology, Netherlands.

Koops, L S W (2017) Creating public value: Optimizing cooperation between public and private partners in infrastructure projects. PhD thesis, Delft University of Technology, Netherlands.

Kotula, M (2013) Development of a risk-oriented strategic sourcing (ROSS) framework for the construction and electronics manufacturing industries. PhD thesis, Aston University, UK.

Kraemer, K W (1982) An econometric analysis of residential construction in the U.S., 1964-1980. PhD thesis, State University of New York at Binghamton, USA.

Krainer, Christiane Wagner Mainardes (2021) Model of social capital accumulation in civil construction companies. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.

Krishnan, R (1987) Knowledge-based aids for model construction. PhD thesis, University of Texas at Austin, USA.

Kua, H W (2006) The design of effective policies for the promotion of sustainable construction materials. PhD thesis, Massachusetts Institute of Technology, USA.

Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.

Kuitert, L; Volker, L and Hermans, M H (2017) Public commissioning in a new era: Public value interests of construction clients. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kumar, S; Dhingra, A and Singh, B (2018) Lean-kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), pp. 143-160.

Kumaraswamy, M M; Ling, F Y Y; Rahman, M M and Phng, S T (2005) Constructing relationally integrated teams. Journal of Construction Engineering and Management, 131(10), pp. 1076-1086. ISSN 0733-9364

Kuo, Y. C. (2026) Interactive relationships among factors influencing skilled labor shortages in the construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 2625-2648. ISSN 0969-9988

Laan, A; Voordijk, H and Kolkman, S (2003) Measuring the added value of it in construction firms. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Labib, Y A M (2017) Lean framework for assessing construction logistics in Jordan. PhD thesis, University of Salford, UK.

Labik, O; Nahmens, I; Ikuma, L and Harvey, C (2023) On-site versus in-factory installation of solar-plus-storage in modular construction. Journal of Construction Engineering and Management, 149(5): 05023003, ISSN 0733-9364

Lai, L W C (2000) The Coasian market-firm dichotomy and subcontracting in the construction industry. Construction Management and Economics, 18(3), pp. 355-362. ISSN 01446193

Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.

Lam, H-C R (2003) An investigation into the implementation of safety management systems by Hong Kong construction contractors. PhD thesis, University of Hong Kong, Hong Kong.

Landes, Drew (2024) Trade, global value chains and power the role of oligopsony, 1995-2020. PhD thesis, The New School, USA.

Langford, D; Martinez, V and Bititci, U (2003) Best value in construction: Towards an interpretation of value from client and constructor perspectives. Journal of Construction Procurement, 9(1), ISSN 1358-9180

Lavelle, D; Hendry, J and Steel, G (2007) The selection of subcontractors: Is price the major factor. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Lawani, K; Arias Abad, L A; Craig, N; Hare, B and Cameron, I (2024) Exploring emotional intelligence and conflict management styles in Dominican Republic construction industry. Journal of Engineering, Design and Technology, 22(1), pp. 89-119. ISSN 1726-0531

Le, P L; Nguyen, M Q and Pham, H T (2025) The roles of supply chain integration, eco-design and digital transformation in improving sustainable construction performance. Engineering, Construction and Architectural Management, 32(12), pp. 8219-8238. ISSN 0969-9988

Le, A T H; Domingo, N; Rasheed, E and Park, K S (2018) Building maintenance cost planning and estimating: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Le, K T (2017) Material inventory control and management system in construction using GIS applications and a "hybrid" tracking system. PhD thesis, Illinois Institute of Technology, USA.

Le, P L; Chaabane, A and Dao, T M (2022) BIM contributions to construction supply chain management trends: An exploratory study in Canada. International Journal of Construction Management, 22(1), pp. 66-84. ISSN 1562-3599

Le, P L; Elmughrabi, W; Dao, T M and Chaabane, A (2020) Present focuses and future directions of decision-making in construction supply chain management: A systematic review. International Journal of Construction Management, 20(5), pp. 490-509. ISSN 1562-3599

Le, P L; Jarroudi, I; Dao, T M and Chaabane, A (2021) Integrated construction supply chain: An optimal decision-making model with third-party logistics partnership. Construction Management and Economics, 39(2), pp. 133-155. ISSN 01446193

Le, P L; Nguyen, T Q L and Nguyen, T T (2025) Exploring the roles of lean design and operations in improving construction logistics collaboration and supply chain performance. Architectural Engineering and Design Management, 21(3), pp. 553-570. ISSN 1745-2007

Le, P T; Kirytopoulos, K; Chileshe, N and Rameezdeen, R (2022) Taxonomy of risks in PPP transportation projects: A systematic literature review. International Journal of Construction Management, 22(2), pp. 166-181. ISSN 1562-3599

Lee, C K and Foo, M Y (2020) Risk attitudes and the big five personality traits: A study on construction project practitioners in Malaysia. International Journal of Construction Management, 22(13), pp. 2435-2445. ISSN 1562-3599

Lee, D; Nie, G Y and Han, K (2024) Automatic and real-time joint tracking and three-dimensional scanning for a construction welding robot. Journal of Construction Engineering and Management, 150(3): 04023165, ISSN 0733-9364

Lee, E B (2000) Constructability and productivity analysis for long life pavement rehabilitation strategies (LLPRS). PhD thesis, University of California, Berkeley, USA.

Lee, E B; Lee, H and Ibbs, C W (2007) Productivity aspects of urban freeway rehabilitation with accelerated construction. Journal of Construction Engineering and Management, 133(10), pp. 798-806. ISSN 0733-9364

Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Lee, H S; Seo, J O; Park, M; Ryu, H G and Kwon, S S (2009) Transaction-cost-based selection of appropriate general contractor-subcontractor relationship type. Journal of Construction Engineering and Management, 135(11), pp. 1232-1240. ISSN 0733-9364

Lee, K H (2004) Site-specific load models and hazards for probability-based design. PhD thesis, Oregon State University, USA.

Lee, K J (2013) A formal and ontological approach to embed commissioning test protocol into building information model. PhD thesis, Carnegie Mellon University, USA.

Lee, W (2018) Use of wearable sensors to unveil roles of task demands-personal resources and burnout on performance of construction workers. PhD thesis, University of Washington, USA.

Lee, W; Lin, K Y; Johnson, P W and Seto, E Y W (2022) Selection of wearable sensor measurements for monitoring and managing entry-level construction worker fatigue: A logistic regression approach. Engineering, Construction and Architectural Management, 29(8), pp. 2905-2923. ISSN 0969-9988

Leghissa, G (2019) Collaboration between construction firms and the supply chain for the implementation of innovation strategies. PhD thesis, Loughborough University, UK.

Leite Júnior, José Agnaldo Pereira (2016) Analysis of the quality of work life applications in the construction industry. PhD thesis, Universidade Estadual de Campinas, Brazil.

Lew, Y L; Hassim, S; Muniandy, R and Hua, L T (2018) Structural equation modelling for subcontracting practice: Malaysia chapter. Engineering, Construction and Architectural Management, 25(7), pp. 835-860. ISSN 0969-9988

Lewis, T M and Hosein, R (2006) An estimation of the size of the hidden labour force in construction in Trinidad and Tobago. Construction Management and Economics, 24(8), pp. 805-815. ISSN 1466433X

Ley, J D (2004) An environmental and material flow analysis of the UK steel construction sector. EngD thesis, Cardiff University, UK.

Li, X.; Chen, W.; Lu, J. and Jim, C. Y. (2026) Financing model for prefabricated building supply chain under the blockchain environment. Journal of Financial Management of Property and Construction, 31(2), pp. 297-324. ISSN 1366-4387

Li, Y and Zhong, R Y (2026) Spatial-temporal traceability and coordination in modular integrated construction: A future framework with hybrid digital twin and reinforcement learning. International Journal of Construction Management, 26(5), pp. 875-904. ISSN 1562-3599

Li, Z and Mok Paik, S (2025) Resource cost optimization strategies in off-site manufacturing for modern construction methods: A lean theory perspective case study in Ireland. International Journal of Construction Management, 25(16), pp. 1892-1900. ISSN 1562-3599

Li, C Z; Wen, S; Yi, W; Wu, H and Tam, V W Y (2024) Offsite construction supply chain challenges: An integrated overview. Journal of Construction Engineering and Management, 150(7): 03124003, ISSN 0733-9364

Li, H; Yuan, W and Xu, J (2025) How to predict the entry mode of international construction contractor: A case-based reasoning approach. Engineering, Construction and Architectural Management, 32(4), pp. 2299-2319. ISSN 0969-9988

Li, J; Zuo, J; Jiang, W; Zhong, X; Li, J and Pan, Y (2020) Policy instrument choice for construction and demolition waste management: The case study of Shenzhen, China. Engineering, Construction and Architectural Management, 27(6), pp. 1283-1297. ISSN 0969-9988

Li, J; Mao, L and Cao, J (2025) Process model for claim and payment management in a construction supply chain based on smart contracts. Journal of Construction Engineering and Management, 151(11): 04025172, ISSN 0733-9364

Li, L; Wang, S; Zeng, S; Ma, H and Zheng, R (2025) Unveiling the social responsibility factors in new infrastructure construction. Engineering, Construction and Architectural Management, 32(4), pp. 2272-2298. ISSN 0969-9988

Li, Liancheng (2025) Towards sustainable recovery of waste plastics with the Australian construction industry: Transition scenarios and environmental impact evaluation. PhD thesis, University of Adelaide, Australia.

Li, M; Lin, Q and Jin, H (2023) Research on near-miss incidents monitoring and early warning system for building construction sites based on blockchain technology. Journal of Construction Engineering and Management, 149(12): 04023124, ISSN 0733-9364

Li, Mei (2012) A waste management system for small and medium enterprises engaged in office building retrofit projects. PhD thesis, Queensland University of Technology, Australia.

Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.

Li, X; Lu, W; Xue, F; Wu, L; Zhao, R; Lou, J and Xu, J (2022) Blockchain-enabled IoT-BIM platform for supply chain management in modular construction. Journal of Construction Engineering and Management, 148(2): 0002229, ISSN 0733-9364

Li, Y and Chen, J (2022) Computer vision-based counting model for dense steel pipe on construction sites. Journal of Construction Engineering and Management, 148(1): 04021178, ISSN 0733-9364

Li, Y; Wang, X and Wang, Y (2017) Using bargaining game theory for risk allocation of public-private partnership projects: Insights from different alternating offer sequences of participants. Journal of Construction Engineering and Management, 143(3): 04016102, ISSN 0733-9364

Li, Y; Maxwell, D W and Moehler, R (2025) Facilitating platform-based business model innovation in construction start-ups: A dynamic capability perspective. Construction Management and Economics, 43(10), pp. 864-881. ISSN 0144-6193

Li-Hua, R (2001) Technology transfer in international joint venture projects in China. PhD thesis, University of Northumbria at Newcastle, UK.

Liang, R and Chong, H Y (2019) A hybrid group decision model for green supplier selection: A case study of megaprojects. Engineering, Construction and Architectural Management, 26(8), pp. 1712-1734. ISSN 0969-9988

Liao, L; Ye, Y; Wei, N; Li, H and Fan, C (2024) Exploring blockchain technology acceptance among non-managerial construction practitioners in Shenzhen, China. Engineering, Construction and Architectural Management, 31(5), pp. 2053-2076. ISSN 0969-9988

Lin, G (2011) Decision model for determination of adaptation potential and renewal action for public housing in Singapore. PhD thesis, National University of Singapore, Singapore.

Lin, J J and Golparvar-Fard, M (2021) Visual and virtual production management system for proactive project controls. Journal of Construction Engineering and Management, 147(7): 2045, ISSN 0733-9364

Linares-Garcia, D A and Roofigari-Esfahan, N (2024) Practical deployment of BIM-interoperable voice-based intelligent virtual agent support construction worker productivity. Journal of Construction Engineering and Management, 150(11): 04024153, ISSN 0733-9364

Lindfors, C T (2001) Towards a taxonomy of management in construction: Exploring the structure of management. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ling, F Y Y and Li, S (2016) Business models for foreign firms offering construction-related consultancy services in China. Construction Management and Economics, 34(4-5), pp. 218-235. ISSN 01446193

Lingard, H; Cooke, T and Blismas, N (2012) Do perceptions of supervisors' safety responses mediate the relationship between perceptions of the organizational safety climate and incident rates in the construction supply chain? Journal of Construction Engineering and Management, 138(2), pp. 234-241. ISSN 0733-9364

Lingard, H; Pirzadeh, P and Oswald, D (2019) Talking safety: Health and safety communication and safety climate in subcontracted construction workgroups. Journal of Construction Engineering and Management, 145(5): 04019029, ISSN 0733-9364

Lingard, H and Rowlinson, S (1994) Construction site safety in Hong Kong. Construction Management and Economics, 12(6), pp. 501-510. ISSN 01446193

Lingard, H C; Cooke, T and Blismas, N (2010) Safety climate in conditions of construction subcontracting: A multi-level analysis. Construction Management and Economics, 28(8), pp. 813-825. ISSN 1466433X

Lingard, H C; Townsend, K; Bradley, L and Brown, K (2008) Alternative work schedule interventions in the Australian construction industry: A comparative case study analysis. Construction Management and Economics, 26(10), pp. 1101-1112. ISSN 1466433X

Lingard, H C; Yip, B; Rowlinson, S and Kvan, T (2007) The experience of burnout among future construction professionals: A cross-national study. Construction Management and Economics, 25(4), pp. 345-357. ISSN 1466433X

Liu, J; Jin, T; Pan, Y and Li, Y (2026) Data sharing mechanism among intelligent transportation infrastructure stakeholders: Based on the data value chain perspective. Journal of Construction Engineering and Management, 152(2): 04025240, ISSN 0733-9364

Liu, L. and Liu, Y. (2026) From engagement to endurance: Modeling the long-term sustainability of VR training in construction through an ecological systems perspective. Journal of Construction Engineering and Management, 152(8): 04026130, ISSN 0733-9364

Liu, X; Zhu, T; Xue, Y; Huang, Z and Le, Y (2025) Analyzing the drivers of the low-carbon construction supply chain based on an integrated DEMATEL-ANP approach. Engineering, Construction and Architectural Management, 32(8), pp. 5132-5159. ISSN 0969-9988

Liu, J; Chan, T K; Ndukwe, C V and Liang, Y (2021) Building resilient supply chains for construction small and medium sized enterprises. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X

Liu, J; Love, P E D; Sing, M C P; Carey, B and Matthews, J (2015) Modeling Australia's construction workforce demand: Empirical study with a global economic perspective. Journal of Construction Engineering and Management, 141(4): 05014019, ISSN 0733-9364

Liu, J; Yang, P; Xia, B and Skitmore, M (2017) Effect of perceived justice on subcontractor willingness to cooperate: The mediating role of relationship value. Journal of Construction Engineering and Management, 143(9): 04017062, ISSN 0733-9364

Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988

Liu, R (2021) Impact of enhanced context-awareness for construction field crews on task cycle time. PhD thesis, Stanford University, USA.

Liu, X; Meng, J; Wang, J and Ji, Y (2025) Influencing factors and improvement strategies of supply chain resilience of prefabricated construction from the perspective of dynamic capabilities: The case of China. Engineering, Construction and Architectural Management, 32(5), pp. 3465-3494. ISSN 0969-9988

Liu, Y (2023) Worker-centric human-robot co-adaptation in construction. PhD thesis, Pennsylvania State University, USA.

Liu, Y; Yao, F; Ji, Y; Tong, W; Liu, G; Li, H X and Hu, X (2022) Quality control for offsite construction: Review and future directions. Journal of Construction Engineering and Management, 148(8): 03122003, ISSN 0733-9364

Lohne, J; Klakegg, O J and Lædre, O (2023) Understanding the potential for criminal activity in the Norwegian AEC industry: A building process perspective. Journal of Construction Engineering and Management, 149(1): 05022015, ISSN 0733-9364

Lombardi Filho, Pedro (2022) Management of small volumes of asbestos-cement materials in Brazil: From use to waste. PhD thesis, Universidade de São Paulo, Brazil.

London, K and Singh, V (2013) Integrated construction supply chain design and delivery solutions. Architectural Engineering and Design Management, 9(3), pp. 135-157. ISSN 1745-2007

London, K A and Kenley, R (2001) An industrial organization economic supply chain approach for the construction industry: A review. Construction Management and Economics, 19(8), pp. 777-788. ISSN 01446193

London, Kerry (2004) Construction supply chain procurement modelling. PhD thesis, University of Melbourne, Australia.

Loo, S C; Wang, C; Yap, J B H; Abdul-Rahman, H and Wood, L C (2020) Globalisation entry decision-supporting tool for international construction risks. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 151-166. ISSN 17514304

Loosemore, M (2014) Rebalancing the construction productivity debate. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Loosemore, M; Alkilani, S Z and Hammad, A W A (2021) The job-seeking experiences of migrants and refugees in the Australian construction industry. Building Research & Information, 49(8), pp. 912-929. ISSN 0961-3218

Loosemore, M; Alkilani, S Z and Luperdi, S (2021) Productivity and industrial relations in the Australian construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 167-176. ISSN 17514304

Loosemore, M; Alkilani, S Z and Mathenge, R (2019) Barriers to employment faced by disadvantaged groups targeted by new social procurement policies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Loosemore, M; Keast, R and Barraket, J (2022) A typology of social procurement champions in the construction and engineering industry. Construction Management and Economics, 40(5), pp. 391-405. ISSN 01446193

Loosemore, M and Lim, B (2015) Inter-organizational unfairness in the construction industry. Construction Management and Economics, 33(4), pp. 310-326. ISSN 01446193

Loosemore, M and Lim, B T H (2017) Linking corporate social responsibility and organizational performance in the construction industry. Construction Management and Economics, 35(3), pp. 90-105. ISSN 01446193

Loosemore, M and Lim, B T-H (2016) Intra-organisational injustice in the construction industry. Engineering, Construction and Architectural Management, 23(4), pp. 428-447. ISSN 0969-9988

Loosemore, M and Phua, F (2010) Untangling rhetoric and reality in the CSR debate: The role of corporate social responsibility in effective business strategy. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lopes, Carmen Silvia Gonçalves (2016) Active learning in training engineer: The influence of the use of learning strategies for skills based on a systemic view. PhD thesis, Universidade de São Paulo, Brazil.

Lopes, J P; Oliveira, R A and Abreu, M I (2019) Estimating the built environment stock in Cape Verde. Engineering, Construction and Architectural Management, 26(5), pp. 814-826. ISSN 0969-9988

Lordsleem Junior, Alberto Casado (2002) Methodology for subcontractor companies management capacitation. PhD thesis, Universidade de São Paulo, Brazil.

Loudoun, R J (2010) Injuries sustained by young males in construction during day and night work. Construction Management and Economics, 28(12), pp. 1313-1320. ISSN 1466433X

Love, P E D; Smith, J; Treloar, G J and Li, H (2000) Some empirical observations of service quality in construction. Engineering, Construction and Architectural Management, 7(2), pp. 191-201. ISSN 0969-9988

Low, S P and Gao, S (2011) The application of the just-in-time philosophy in the Chinese construction industry. Journal of Construction in Developing Countries, 16(1), pp. 91-111. ISSN 1823-6499

Low, S P and Wu, M (2005) Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore. Construction Management and Economics, 23(8), pp. 815-829. ISSN 01446193

Lowe, J (1997) Labour productivity trends for the UK construction sector. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Lowe, J (2023) Technical and organisational change in UK construction. Journal of Construction Business and Management, 6(2), pp. 50-61. ISSN 2521-0165

Lu, M and Anson, M (2004) Establish concrete placing rates using quality control records from Hong Kong building construction projects. Journal of Construction Engineering and Management, 130(2), pp. 216-224. ISSN 0733-9364

Lu, W; Olofsson, T and Stehn, L (2011) A lean-agile model of homebuilders' production systems. Construction Management and Economics, 29(1), pp. 25-35. ISSN 1466433X

Lu, W; Wu, L; Zhao, R; Li, X and Xue, F (2021) Blockchain technology for governmental supervision of construction work: Learning from digital currency electronic payment systems. Journal of Construction Engineering and Management, 147(10): 02148, ISSN 0733-9364

Lu, W; Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(4), pp. 448-463. ISSN 0969-9988

Luambano, C; Kavishe, N; Zulu, S and Chileshe, N (2023) Drivers and challenges of vertical integration in the Tanzanian construction industry. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Lundberg, E J and Beliveau, Y J (1989) Automated lay-down yard control system: ALYC. Journal of Construction Engineering and Management, 115(4), pp. 535-544. ISSN 0733-9364

Lundgren, R (2023) Social life cycle assessment of adaptive reuse. Buildings & Cities, 4(1), pp. 334-351. ISSN 2632-6655

Lundula, N (2024) Influence of leaders’ conflict management skills on multicultural team management. PhD thesis, Walden University, USA.

Luo, Q.; Sun, C.; Li, G.; Li, Y.; Xue, J. and Zhang, G. (2026) Hierarchical schedule risk structures and mitigation strategies in prefabricated building projects: An integrated SNA-ISM approach. Engineering, Construction and Architectural Management, 33(7), pp. 5737-5759. ISSN 0969-9988

Luu, D and Sher, W (2006) Construction tender subcontract selection using case-based reasoning. Construction Economics and Building, 6(2), pp. 32-43. ISSN 2204-9029

Lynch, Peter (2003) Growth-survival tradeoffs of Queensland licensed homebuilders 1986-1996: An event history study. PhD thesis, University of Queensland, Australia.

Madanayake, U (2021) Digitalisation to improve organisational competitive advantage: a study on BBI exploitation. PhD thesis, London South Bank University, UK.

Madhavika, N; Bandara, M; Manchanayake, M; Perera, C; Bandara, W; Jayasinghe, P and Ehalapitiya, S (2025) Navigating economic crisis: Factors shaping resilience in Sri Lankan construction SME supply chains. International Journal of Construction Management, 25(11), pp. 1324-1336. ISSN 1562-3599

Maghiar, M; Sturges, D; Maurer, T and Jackson, M (2015) Exploration of student perceptions, behaviors and academic performance in construction management classes. International Journal of Construction Education and Research, 11(4), pp. 241-256. ISSN 1557-8771

Magill, L J; Jafarifar, N; Watson, A and Omotayo, T (2022) 4D BIM integrated construction supply chain logistics to optimise on-site production. International Journal of Construction Management, 22(12), pp. 2325-2334. ISSN 1562-3599

Maguire, K J P (2008) Risk, culture, and organization: a study of injury among construction workers. PhD thesis, University of Salford, UK.

Mahamadu, A M; Mahdjoubi, L; Booth, C; Manu, P and Manu, E (2019) Building information modelling (BIM) capability and delivery success on construction projects. Construction Innovation, 19(2), pp. 170-192. ISSN 1471-4175

Mahamadu, A-M (2017) Development of a decision support framework to aid selection of construction supply chain organisations for BIM-enabled projects. PhD thesis, University of the West of England, Bristol, UK.

Mahamadu, A-M; Mahdjoubi, L and Booth, C A (2017) Critical BIM qualification criteria for construction pre-qualification and selection. Architectural Engineering and Design Management, 13(5), pp. 326-343. ISSN 1745-2007

Mahjoubpour, B; Nasirzadeh, F; Mohammad Hosein Zadeh Golabchi, M; Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers' learning behavior in construction projects using agent-based approach: The case study of a steel structure project. Engineering, Construction and Architectural Management, 25(4), pp. 559-573. ISSN 0969-9988

Mai, T P A; Doan, D T and Ghaffarianhoseini, A (2025) Utilizing multiskilled resources in addressing labor shortage issues in off-site construction: Benefits, challenges, and best practices. Journal of Construction Engineering and Management, 151(4): 04025014, ISSN 0733-9364

Maisarah, F; Abduh, M; Wirahadikusumah, R and Cakravastia, A (2025) Development of the conceptual business model of a third-party logistics provider for Indonesian small contractors. International Journal of Construction Management, 25(2), pp. 194-203. ISSN 1562-3599

Maiti, S and Choi, J H (2021) Investigation and implementation of conflict management strategies to minimize conflicts in the construction industry. International Journal of Construction Management, 21(4), pp. 337-352. ISSN 1562-3599

Makore, S (2015) The role of knowledge management in organisational performance. PhD thesis, University of Pretoria, South Africa.

Male, S (1990) Professional authority, power and emerging forms of 'profession' in quantity surveying. Construction Management and Economics, 8(2), pp. 191-204. ISSN 01446193

Mallawaarachchi, V T; Senanayake, S M A H; Disaratna, V and Perera, B A K S (2024) Application of subcontracting as a quality improvement tool for building constructions in Sri Lanka. International Journal of Construction Management, 24(1), pp. 44-56. ISSN 1562-3599

Maloney, W F (2003) Labor-management cooperation and customer satisfaction. Journal of Construction Engineering and Management, 129(2), pp. 165-172. ISSN 0733-9364

Maloney, W F and McFillen, J M (1995) Job characteristics: Union-nonunion differences. Journal of Construction Engineering and Management, 121(1), pp. 43-54. ISSN 0733-9364

Mambwe, M; Mwanaumo, E M; Phiri, F and Chabota, K (2020) The construction subcontracting policy framework for developing local contractors capacities in Zambia. Journal of Construction Business and Management, 4(1), pp. 60-70. ISSN 2521-0165

Mandal, S (2014) Supply chain resilience: A state-of-the-art review and research directions. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 427-453. ISSN 1759-5916

Mandal, S (2017) An empirical competence-capability model of supply chain resilience. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 190-208. ISSN 1759-5916

Mandal, S; Bhattacharya, S; Korasiga, V R and Sarathy, R (2017) The dominant influence of logistics capabilities on integration: Empirical evidence from supply chain resilience. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 357-374. ISSN 1759-5916

Mandal, S; Sarathy, R; Korasiga, V R; Bhattacharya, S and Dastidar, S G (2016) Achieving supply chain resilience: The contribution of logistics and supply chain capabilities. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 544-562. ISSN 1759-5916

Mangezi, W (2019) Red tape in upgrading of informal settlements in Nelson Mandela Bay. PhD thesis, Nelson Mandela University, South Africa.

Manley, K (2008) Implementation of innovation by manufacturers subcontracting to construction projects. Engineering, Construction and Architectural Management, 15(3), pp. 230-245. ISSN 0969-9988

Manninen, D L (1981) Labor force migration associated with nuclear power plant construction. PhD thesis, University of Washington, USA.

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A constructive system to assess the performance-based grading of construction labour through work-based training components and applications. Construction Economics and Building, 23(3-4), pp. 107-124. ISSN 2204-9029

Mansell, P R (2021) Measuring infrastructure projects sustainable development goals impact (MISI). PhD thesis, London South Bank University, UK.

Manu, E (2014) Supply chain management practices in construction and inter-organisational trust dynamics. PhD thesis, University of Wolverhampton, UK.

Manu, E; Ankrah, N; Chinyio, E A and Proverbs, D (2016) Functional consequences of trust in the construction supply chain: A multi-dimensional view. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Manu, E; Ankrah, N A; Chinyio, E and Proverbs, D G (2012) Influence of the macro-economy on trust in construction supply chain chains. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Manu, P A (2012) An investigation into the accident causal influence of construction project features. PhD thesis, University of Wolverhampton, UK.

Manzoni, B; Morris, P and Smyth, H (2009) Equipping project teams to win tenders: An insight into Italian architecture projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Mao, W; Ran, K; Wang, T K; Yu, A; Lv, H and Chen, J H (2025) An optimization model for just-in-time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time. Engineering, Construction and Architectural Management, 32(5), pp. 3259-3284. ISSN 0969-9988

Marandi Alamdari, A; Jabarzadeh, Y; Samson, D and Sanoubar, N (2023) Supply chain risk factors in green construction of residential mega projects: interactions and categorization. Engineering, Construction and Architectural Management, 30(2), pp. 568-597. ISSN 0969-9988

Marciano, E J (2003) Sustainable development and the cement and concrete industries. PhD thesis, Universite de Sherbrooke, Canada.

Marin Ramirez, L S (2014) Safety climate, safety hazards and organizational practices in the construction industry in Colombia. ScD thesis, University of Massachusetts Lowell, USA.

Marsh, L (1998) Portable datafiles in the construction supply chain. PhD thesis, University of Reading, UK.

Marsh, L and Finch, E (1998) Attitudes towards auto-ID technologies within the UK construction industry. Construction Management and Economics, 16(4), pp. 383-388. ISSN 01446193

Marsh, L E and Finch, E F (1999) Using portable datafiles in the construction supply chain. Building Research & Information, 27(3), pp. 127-139. ISSN 0961-3218

Martek, I and Chen, C (2013) Localization typologies evident among foreign enterprises active in the Chinese construction market. Journal of Construction Engineering and Management, 139(10): 04013001, ISSN 0733-9364

Martek, Igor (2012) Localization patterns amongst foreign enterprises active in the Chinese construction industry. PhD thesis, University of Melbourne, Australia.

Martin, J W (1999) Adult education philosophies and teaching styles of construction management faculty of the associated schools of construction. EdD thesis, Oklahoma State University, USA.

Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175

Marzouk, M (2008) A superiority and inferiority ranking model for contractor selection. Construction Innovation, 8(4), pp. 250-268. ISSN 1471-4175

Marzouk, M and Moselhi, O (2002) Simulation optimization for earthmoving operations using genetic algorithms. Construction Management and Economics, 20(6), pp. 535-543. ISSN 01446193

Mashamba, M S (1997) The construction industry in Zambia: opportunities and constraints under the structural adjustment programme and the enabling shelter strategy. PhD thesis, University of Newcastle upon Tyne, UK.

Masood, R; Roy, K; Gonzalez, V A and Lim, J B P (2024) Ameliorating supply chains of prefabricated housebuilding: An integrated performance framework. Journal of Construction Engineering and Management, 150(6): 04024044, ISSN 0733-9364

Matsane, Z S-s (2023) An integrated SCM model for collaborative working in construction in South Africa. PhD thesis, University of Johannesburg, South Africa.

Matsuzaki, Hajime (1995) Construction industry unionism in Japan. PhD thesis, University of New South Wales, Australia.

Matthews, J; Tyler, A and Thorpe, A (1996) Pre-construction project partnering: Developing the process. Engineering, Construction and Architectural Management, 3(1-2), pp. 117-131. ISSN 0969-9988

Matthewson, C (1992) The relationship between tactical management and contract procurement in the North American competitive lump sum bidding process. PhD thesis, Heriot-Watt University, UK.

Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(4), pp. 629-638. ISSN 1562-3599

Maxwell, D and Couper, R (2023) Construction tracking: Implications of logistics data. Construction Innovation, 23(2), pp. 322-339. ISSN 1471-4175

Mayara Regina, M and Tavares, S F (2021) Materials passport's review: Challenges and opportunities toward a circular economy building sector. Built Environment Project and Asset Management, 11(4), pp. 767-782. ISSN 2044-124X

Mbachu, J (2008) Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26(5), pp. 471-484. ISSN 1466433X

Mbae, A M and Nwulu, N I (2020) Day-ahead load forecasting using improved grey Verhulst model. Journal of Engineering, Design and Technology, 18(5), pp. 1335-1348. ISSN 1726-0531

McBride, M L (2003) Bunkhouses, black flies, and seasonal unemployment: The industrial construction industry in Newfoundland, 1960s–1990s. PhD thesis, Memorial University of Newfoundland, Canada.

McConnell, C W (2004) Predictors of work injuries: A quantitative exploration of level of English proficiency as a predictor of work injuries in the construction industry. PhD thesis, Colorado State University, USA.

McConnell, C W; Gloeckner, G and Gilley, J (2006) Predictors of work injuries: A quantitative exploration of level of english proficiency as a predictor of work injuries in the construction industry. International Journal of Construction Education and Research, 2(1), pp. 3-28. ISSN 1557-8771

McCord, K (2022) Augmented reality for hands-on construction education. PhD thesis, Arizona State University, USA.

McCord, P J and Gunderson, D E (2014) Factors that most affect relationships with general contractors on commercial construction projects: Pacific Northwest subcontractor perspectives. International Journal of Construction Education and Research, 10(2), pp. 126-139. ISSN 1557-8771

McCullouch, B G (1988) Automatic identification technology applications in industrial construction. PhD thesis, Auburn University, USA.

McDermott, P; Khalfan, M and Swan, W (2005) Trust in construction projects. Journal of Financial Management of Property and Construction, 10(1), pp. 19-32. ISSN 1366-4387

McDermott, P and Khalfan, M M A (2006) Achieving supply chain integration within construction industry. Construction Economics and Building, 6(2), pp. 44-54. ISSN 2204-9029

McGartland, M R and Hendrickson, C T (1985) Expert systems for construction project monitoring. Journal of Construction Engineering and Management, 111(3), pp. 293-307. ISSN 0733-9364

McGrath-Champ, S and Rosewarne, S (2009) Organizational change in Australian building and construction: Rethinking a unilinear 'leaning' discourse. Construction Management and Economics, 27(11), pp. 1111-1128. ISSN 1466433X

McWilliam, Sarah (2022) Global value chain governance dynamics: A co-evolutionary perspective on the transition from relational to modular governance in construction. PhD thesis, University of Sydney, Australia.

Mega, T (2008) Implications of quality management in the Greek construction industry. PhD thesis, University College London, UK.

Meglin, R (2022) Economic and environmental assessment of a regional construction and building materials industry in Switzerland: An applied combination of material-flow analysis, life-cycle assessment and input-output analysis. DSc thesis, ETH Zürich, Switzerland.

Melia, K (2005) Exploring and modelling the process of change management in construction organisations. PhD thesis, University of Dundee, UK.

Meng, S (2023) Development of a regional wind risk assessment framework for wood-frame single-family residential building stock. PhD thesis, University of California, Los Angeles, USA.

Meng, X (2008) Development of assessment framework for construction supply chain relationships. PhD thesis, University of the West of England, Bristol, UK.

Mer'Eb, M M (2008) GREENOMETER-7: A tool to assess the sustainability of a building's life cycle at the conceptual design phase. DEng thesis, Cleveland State University, USA.

Metham, M and Benjaoran, V (2015) The assessment of greenhouse gas emissions for evaluating actual road construction operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Mewomo, M C (2019) The construction industry stakeholders preliminary views on the proposed South African prompt payment and statutory adjudication regulations. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451

Miller, C; Packham, G and Thomas, B (2003) Inter-organisational relationships and their effect upon small construction enterprises in South Wales: Co-operation at a cost. Journal of Construction Procurement, 9(2), pp. 17-28. ISSN 1358-9180

Miller, C J M; Packham, G A and Thomas, B C (2002) Harmonization between main contractors and subcontractors: a prerequisite for lean construction? Journal of Construction Research, 3(01), 67–82. Journal of Construction Research, ISSN 1609-9451

Miller, C J M; Packham, G A and Williams, T (1999) Re-defining sub-contracting: Reducing transaction costs? In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Miller, D P (2009) Essays on subcontracting, competitive bidding, and dynamic housing demand. PhD thesis, University of Minnesota, USA.

Miller, J (2024) Leadership traits among site leaders in the construction industry. DBA thesis, California Baptist University, USA.

Miller, K S (1988) The causes of decentralization of the bargaining structure in the construction industry in the state of Ohio. PhD thesis, Ohio State University, USA.

Millett, S J; Dainty, A R J; Briscoe, G H and Neale, R H (2000) Towards an integrated construction supply network: Sub-contractors perspectives. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.

Min, J U (2004) Supply chain visualization through web services integration. PhD thesis, Stanford University, USA.

Min, W and Pheng, L S (2005) Economic order quantity (EOQ) versus just-in-time (JIT) purchasing: An alternative analysis in the ready-mixed concrete industry. Construction Management and Economics, 23(4), pp. 409-422. ISSN 01446193

Min, W and Pheng, L S (2005) EOQ with a price discount versus JIT purchasing: an alternative analysis in the ready-mixed concrete industry. Journal of Construction Research, 6(1), pp. 47-69. ISSN 1609-9451

Minchin, R E; Cui, S; Walters, R C; Issa, R and Pan, J (2013) Sino-American opinions and perceptions of counterfeiting in the construction supply chain. Journal of Construction Engineering and Management, 139(1), pp. 1-8. ISSN 0733-9364

Minchin, R E and Thomas, H R (2003) Validation of vibration-based onboard asphalt density measuring system. Journal of Construction Engineering and Management, 129(1), pp. 1-7. ISSN 0733-9364

Mirabella, N and Allacker, K (2021) Urban GHG accounting: Discrepancies, constraints and opportunities. Buildings & Cities, 2(1), pp. 21-35. ISSN 2632-6655

Mirzaei, Z (2015) An investigation of methodologies to determine the most sustainable bridge work programs. DSc thesis, ETH Zürich, Switzerland.

Moghayedi, A. and Awuzie, B. (2026) Unlocking sustainability futures: A framework for digital product passports and material banks in a circular built environment. Construction Innovation, 26(9), pp. 135-166. ISSN 1471-4175

Mohamed Sultan, A A B (2019) Decision tools for recycling with a focus on fibre reinforced composites. PhD thesis, University of Manchester, UK.

Mohammadi, P; Asgari, S; Rashidi, A and Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6): 04025052, ISSN 0733-9364

Mohammadrezaytayebi, S; Sebt, M H and Afshar, M R (2023) Introducing a system dynamic–based model of quality estimation for construction industry subcontractors' works. International Journal of Construction Management, 23(4), pp. 586-595. ISSN 1562-3599

Mohlasedi, K M and Nkado, R N (1997) The role of stakeholders in the delivery of affordable housing schemes in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Mojahed, S (2005) A project improvement system for effective management of construction projects. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Monteiro, Nathalie Barbosa Reis (2021) Life cycle management: Foundations for the application of circular economy in concrete industries of civil construction. PhD thesis, Universidade Federal do Piauí, Brazil.

Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599

Moon, S; Xu, S; Hou, L; Wu, C; Wang, X and Tam, V W Y (2018) RFID-aided tracking system to improve work efficiency of scaffold supplier: Stock management in Australasian supply chain. Journal of Construction Engineering and Management, 144(2): 04017115, ISSN 0733-9364

Moon, S; Zekavat, P R and Bernold, L E (2015) Dynamic control of construction supply chain to improve labor performance. Journal of Construction Engineering and Management, 141(6): 05015002, ISSN 0733-9364

Moon, S; Zekavat, P R and Bernold, L E (2017) Dynamic quality control of process resource to improve concrete supply chain. Journal of Construction Engineering and Management, 143(5): 04016130, ISSN 0733-9364

Moore, P and Loosemore, M (2014) Burnout of undergraduate construction management students in Australia. Construction Management and Economics, 32(11), pp. 1066-1077. ISSN 01446193

Moore, S (2020) RICS professional education and training for quantity surveyors and the extent to which it is relevant in the current UK built environment market. DProf thesis, University of Salford, UK.

Morrey N, D A and Thomson D, P C (2013) Problematisation of the shift from products to services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Morton, C N (1979) Collective bargaining in building and civil engineering: a case study of three major re-development protects in the City of London. PhD thesis, London School of Economics and Political Science, UK.

Mossman, A and Sarhan, S (2021) Synchronising off-site fabrication with on-site production in construction. Construction Economics and Building, 21(3), pp. 122-141. ISSN 2204-9029

Mostafa, S; Chileshe, N and Zuo, J (2014) A synergistic supply chain enhancing offsite manufacturing uptake in Australian house building. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Mpakati-Gama, E C; Brown, A and Sloan, B (2016) Embodied energy and carbon analysis of urban residential buildings in Malawi. International Journal of Construction Management, 16(1), pp. 1-12. ISSN 1562-3599

Mudiyanselage, A C E E; Shen, G Q P and Kumaraswamy, M M (2019) Managing vulnerabilities and capabilities for supply chain resilience in industrialised construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Mujalli, R O; Marie, I and Al-Kasasbeh, M (2024) Consequences of COVID-19 on jordan's construction sector using data mining techniques. International Journal of Construction Management, 24(12), pp. 1339-1348. ISSN 1562-3599

Mukopfa, C (2021) Strategies to sustain small construction businesses beyond the first 5 years of operation. DBA thesis, Walden University, USA.

Mulholland, S M; Boffy-Ramirez, E and Clevenger, C M (2026) Incentives and effort elicitation in construction contracting: Modeling strategic behavior under DBB and CMR/GMP contracts. Construction Management and Economics, 44(2), pp. 143-158. ISSN 0144-6193

Mulville, M; Jones, K; Huebner, G and Powell-Greig, J (2017) Energy-saving occupant behaviours in offices: Change strategies. Building Research & Information, 45(8), pp. 861-874. ISSN 0961-3218

Munaro, M R; Freitas, M D C D; Tavares, S F and Bragança, L (2021) Circular business models: Current state and framework to achieve sustainable buildings. Journal of Construction Engineering and Management, 147(12): 04021164, ISSN 0733-9364

Murguia, D; Demian, P and Soetanto, R (2017) A systemic BIM innovation model in the construction supply chain. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Murphy, M and Ren, Z (2010) Engaging female employees at technical and professional status in the South Wales construction sector. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Murray, B and Smyth, H (2009) Barriers to franchise initiation for general contractors in US remodeling industry: A non-franchisor perspective. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Murray, B and Smyth, H (2011) Franchising in the US remodelling market: Growth opportunities and barriers faced by general contractors. Construction Management and Economics, 29(6), pp. 623-634. ISSN 1466433X

Mustaffa, N K and Carmichael, D G (2019) Concreting operations: the relationship between unit costs and unit emissions. International Journal of Construction Management, 19(5), pp. 427-435. ISSN 1562-3599

Muya, M (1999) A systematic approach for improving construction materials logistics. PhD thesis, Loughborough University, UK.

Muya, M; Price, A D F and Thorpe, A (1998) Supplier evaluation of logistics factors and their contribution to improved customer service. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Myers, H; Wade, F and Webb, J (2019) Mapping emerging subcontracting networks for the energy efficiency retrofit of hard-to-treat buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Naismith, N; Price, A D F; Dainty, A R J; Bryman, A; Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(2),

Nana-Addy, E; Musonda, I and Okoro, C (2022) Assessing causative characteristics of abandoned completed urban market projects in Ghana. Journal of Construction in Developing Countries, 27(2), pp. 147-161. ISSN 1823-6499

Naoum, S and Haidar, A L I (2000) A hybrid knowledge base system and genetic algorithms for equipment selection. Engineering, Construction and Architectural Management, 7(1), pp. 3-14. ISSN 0969-9988

Narayana, N S S (1976) Engineering production function and choice of technique. PhD thesis, Indian Statistical Institute - Kolkata, India.

Narayana Naidelage, Chamari Pushpamali (2021) The role of reverse logistics on supply chain performance. PhD thesis, Queensland University of Technology, Australia.

Naresh, A L and Jahren, C T (1997) Communications and tracking for construction vehicles. Journal of Construction Engineering and Management, 123(3), pp. 261-268. ISSN 0733-9364

Nassar, Y.; Albeaino, G.; Jeelani, I.; Gheisari, M. and Issa, R. R. A. (2026) Human-robot collaboration levels in construction with mobile ground robots: Cognitive workload, safety perception, and attitudes. Journal of Construction Engineering and Management, 152(9): 04026155, ISSN 0733-9364

Navendren, D; Manu, P; Shelbourn, M and Mahamadu, A M (2014) Challenges to building information modelling implementation in UK: Designers' perspectives. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Navon, R (1995) Economic benefits of lightweight versus conventional construction methods. Journal of Construction Engineering and Management, 121(1), pp. 27-36. ISSN 0733-9364

Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X

Nawarathna, A.; Alwan, Z.; Gledson, B. and Fernando, N. G. (2026) An early-stage embodied carbon assessment method for the Global South: Sri Lankan case study. Built Environment Project and Asset Management, pp. 1-16. ISSN 2044-124X

Nazem, S M (1969) A study into the technical and managerial manpower in the construction industry. PhD thesis, University of Manchester, UK.

Ndukwe, C V; Chan, T K; Gao, G and Liu, J (2021) Development of economic nationalism in Australia and implication for the construction supply chain. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Ndukwe, Chigozie Victor (2023) Impact of globalisation on the construction supply chain: Challenges and responses in Victoria. PhD thesis, University of Melbourne, Australia.

Nee, T S; Xing, A C and Yong, L Y (2024) Assessing the post-disaster effects of COVID-19 pandemic towards Malaysian construction industry. Journal of Construction in Developing Countries, 29(2), pp. 59-75. ISSN 1823-6499

Neshat, N (2013) Conceptualization, measurement and empirical exploration of selected supply chain risk constructs. DSc thesis, ETH Zürich, Switzerland.

Ness, K (2010) The discourse of 'respect for people' in UK construction. Construction Management and Economics, 28(5), pp. 481-493. ISSN 1466433X

Ness, K and Green, S (2008) Respect for people in the enterprise culture? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Ng, Y. Y.; Ma, Q. and Yam, M. C. H. (2026) Optimizing subcontractor selection: A dual-model AHP framework for aligning client and contractor priorities in construction. Journal of Engineering, Design and Technology, 24(4), pp. 869-893. ISSN 1726-0531

Ng, F P (2003) Quantity and pricing decisions in the presence of advance contracts. PhD thesis, Stanford University, USA.

Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.

Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ng, S T; Shi, J and Fang, Y (2009) Enhancing the logistics of construction materials through activity-based simulation approach. Engineering, Construction and Architectural Management, 16(3), pp. 224-237. ISSN 0969-9988

Ng, S T and Tang, Z (2008) Delineating the predominant criteria for subcontractor appraisal and their latent relationships. Construction Management and Economics, 26(3), pp. 249-259. ISSN 1466433X

Nguyen, V. T. and Khuc, T. Q. (2026) How structural modelling of R-principles reveals their interactions and guides circular economy implementation in Vietnam. Engineering, Construction and Architectural Management, pp. 1-30. ISSN 0969-9988

Nguyen, D T and Le, P L (2022) Twenty-year application of logistics and supply chain management in the construction industry. Construction Management and Economics, 40(10), pp. 796-834. ISSN 01446193

Nguyen, D T; Rameezdeen, R; Chileshe, N and Coggins, J (2022) Effect of customer cooperative behavior on reverse logistics outsourcing performance in the construction industry: a partial least squares structural equation modeling approach. Engineering, Construction and Architectural Management, 29(9), pp. 3345-3362. ISSN 0969-9988

Nicolini, D; Holti, R and Smalley, M (2001) Integrating project activities: the theory and practice of managing the supply chain through clusters. Construction Management and Economics, 19(1), pp. 37-47. ISSN 01446193

Nielsen, L-H K; Akanmu, A and Anumba, C J (2015) Comparative analysis of back-to-back subcontracts in the construction and telecommunications industries. Built Environment Project and Asset Management, 5(4), pp. 446-460. ISSN 2044-124X

Nijhof, A; Graafland, J and de Kuijer, O (2009) Exploration of an agenda for transparency in the construction industry. Construction Innovation, 9(3), pp. 250-267. ISSN 1471-4175

Nikkhah Manesh, S (2020) Temporal and spatial analysis of the wage gap for women and underrepresented minorities in the architecture, engineering, and construction (AEC) workforce. PhD thesis, University of Nevada, Las Vegas, USA.

Nikolov, A (2022) Exploring pathways for improving the supply chain integration of infrastructure projects. PhD thesis, University of Warwick, UK.

Nimbarte, A D (2009) Modeling the risk factors associated with the neck disorders during manual material handling tasks. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Ninan, J; Mantha, B R K and Kesavan, B (2025) Human-centred cybersecurity for critical infrastructure: The case of the Florida water plant hack. Engineering, Construction and Architectural Management, 32(13), pp. 547-569. ISSN 0969-9988

Nisbet, P (1995) Dualism, flexibility and self-employment in the UK construction industry. PhD thesis, University of Bath, UK.

Niu, Y; Lu, W; Liu, D; Chen, K C; Anumba, C A and Huang, G G (2017) An sco-enabled logistics and supply chain-management system in construction. Journal of Construction Engineering and Management, 143(3): 04016103, ISSN 0733-9364

Niu, Y; Nwagboso, C; Proverbs, D and Olomolaiye, P (2004) Developing supply chain integration in building technologies cluster. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Noorizadeh, A; Peltokorpi, A and Avkiran, N K (2019) Supplier performance evaluation in construction projects: Challenges and possible solutions. Journal of Construction Engineering and Management, 145(4): 04019007, ISSN 0733-9364

Nordin, F; Christina, O; Kollberg, B and Nord, T (2010) Building a new supply chain position: An exploratory study of companies in the timber housing industry. Construction Management and Economics, 28(10), pp. 1071-1083. ISSN 1466433X

Noyce, D A and Hanna, A S (1997) Planned schedule compression concept file for electrical contractors. Journal of Construction Engineering and Management, 123(2), pp. 189-197. ISSN 0733-9364

Nuesse, G (2013) Development of an integrated management model for effective applications of cooperative construction research. PhD thesis, Kingston University, UK.

Nwankwo, D C (2023) Improving approaches to material inventory management in construction industry in the UK. DBA thesis, University of Wales Trinity Saint David, UK.

Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165

O'Connor, M G (2016) Labour market institutions in the Brazilian variety of capitalism since 2003: Evidence from the construction industry. PhD thesis, University of York, UK.

Ochoa Franco, L A (2004) Life cycle assessment of residential buildings. PhD thesis, Carnegie Mellon University, USA.

Odiba, E; Demian, P and Ruikar, K (2021) Development of a conceptual framework for effective quality management practices in construction organisations. Journal of Construction Business and Management, 5(1), pp. 1-16. ISSN 2521-0165

Odoemena, A T and Horita, M (2018) A strategic analysis of contract termination in public-private partnerships: Implications from cases in Sub-Saharan Africa. Construction Management and Economics, 36(2), pp. 96-108. ISSN 0144-6193

Ofori, G and Debrah, Y A (1998) Flexible management of workers: Review of employment practices in the construction industry in Singapore. Construction Management and Economics, 16(4), pp. 397-408. ISSN 01446193

Ogunbiyi, O; Goulding, J S and Oladapo, A (2014) An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Construction Innovation, 14(1), pp. 88-107. ISSN 1471-4175

Ogundare, I.; Kassa, R.; Maali, O.; Lines, B.; Smithwick, J. and Sullivan, K. (2026) Skillsets differences among field leaders in the US sheet metal and air conditioning trades. Built Environment Project and Asset Management, 16(3), pp. 561-577. ISSN 2044-124X

Ogunseiju, O; Olayiwola, J; Akanmu, A and Olatunji, O A (2022) Evaluation of postural-assist exoskeleton for manual material handling. Engineering, Construction and Architectural Management, 29(3), pp. 1358-1375. ISSN 0969-9988

Ogwueleka, A C (2025) Supply chain integration in public sector construction projects: Adoption and barriers. Construction Economics and Building, 25(3-4), pp. 272-288. ISSN 2204-9029

Okafor, C C; Ani, U S and Ugwu, O (2022) Evaluation of supply chain management lapses in nigeria’s construction industry. International Journal of Construction Education and Research, 18(2), pp. 103-122. ISSN 1557-8771

Okafor, C C; Sydney Ani, U and Ugwu, O (2024) Critical solutions to the lapses of supply chain management in Nigeria's construction industry. International Journal of Building Pathology and Adaptation, 42(4), pp. 768-787. ISSN 23984708

Okanlawon, T T; Oyewobi, L O and Jimoh, R A (2023) Evaluation of the drivers to the implementation of blockchain technology in the construction supply chain management in Nigeria. Journal of Financial Management of Property and Construction, 28(3), pp. 459-476. ISSN 1366-4387

Okika, M C; Vermeulen, A and Pretorius, J H C (2025) A systematic approach to identify and manage supply chain risks in construction projects. Journal of Financial Management of Property and Construction, 30(1), pp. 42-66. ISSN 1366-4387

Okika, Michael Chuba (2023) Risk analysis framework to minimise risks in construction projects. PhD thesis, University of Johannesburg, South Africa.

Okoli, J. (2020) Expert knowledge elicitation in the firefighting domain and the implications for training novices. International Journal of Disaster Resilience in the Built Environment, 11(4), pp. 577-578. ISSN 1759-5908

Okonkwo, P N and Wium, J (2020) Health and safety management systems within construction contractor organizations: Case study of South Africa. Journal of Construction Engineering and Management, 146(5): 05020003, ISSN 0733-9364

Okoroh, M I (2000) An evaluation of residential speculative developers' subcontractors perceived risks. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Okoroh, M I and Torrance, V B (1999) A model for subcontractor selection in refurbishment projects. Construction Management and Economics, 17(3), pp. 315-327. ISSN 01446193

Olatunji, O A; Aje, O I and Makanjuola, S (2017) Bid or no-bid decision factors of indigenous contractors in Nigeria. Engineering, Construction and Architectural Management, 24(3), pp. 378-392. ISSN 0969-9988

Oloke, D (2003) Development of a web-based off-highway plant information system. PhD thesis, University of Wolverhampton, UK.

Oloke, D A; Edwards, D J and Li, B (2001) Intelligent construction plant information management. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Olusanya, O A (2018) Subcontracting systems and social protection in the informal building construction industry in Lagos, Nigeria. Journal of Construction Business and Management, 2(1), pp. 10-19. ISSN 2521-0165

Omar, B (2012) Context-aware services delivery in the construction supply chain. PhD thesis, University of Reading, UK.

Omoraka, A E (2022) A principal component analysis of supply chain management skills for the Nigerian construction industry. International Journal of Construction Management, 22(12), pp. 2413-2421. ISSN 1562-3599

Omoregbe, A O (2020) Immigration policy and the U.S. shortage of construction workers in the skilled trades. PhD thesis, Northcentral University, USA.

Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.

Oral, E L and Mstkolu, G (2000) Current state of Turkish prefabrication companies with respect to the applicability of just in time. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Ortiz, S S (2025) Strengthening construction supply chains: An exploration of decision-making frameworks for resilience in the face of black swan event. PhD thesis, Purdue University, Indiana, USA.

Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure. PhD thesis, University of California, Davis, USA.

Osuizugbo, I C; Kukoyi, P O; Abisuga, A O and Ibrahim, K (2023) Choosing to be a craftsperson: Factors influencing career decision-making among apprentices. Engineering, Construction and Architectural Management, 30(5), pp. 2026-2047. ISSN 0969-9988

Osunsanmi, T O; Aigbavboa, C O; Thwala, W D D and Molusiwa, R (2022) Modelling construction 4.0 as a vaccine for ensuring construction supply chain resilience amid COVID-19 pandemic. Journal of Engineering, Design and Technology, 20(1), pp. 132-158. ISSN 1726-0531

Oswald, D (2016) Investigating unsafe acts on a large multinational construction project. PhD thesis, University of Edinburgh, UK.

Otegbulu, A C (2011) A contingent valuation model for assessing electricity demand. Journal of Financial Management of Property and Construction, 16(2), pp. 126-146. ISSN 1366-4387

Otto, H T (1985) The economics of the construction sector of the ussr. PhD thesis, University of Houston, USA.

Ovbiagbonhia, A R (2021) Learning to innovate: How to foster innovation competence in students of built environment at universities of applied sciences. PhD thesis, Wageningen University and Research, Netherlands.

Oviedo Haito, Ricardo Juan José (2015) Strategies to develop specialist trade contractors. PhD thesis, Universidade de São Paulo, Brazil.

Oviedo-Haito, R J; Jiménez, J; Cardoso, F F and Pellicer, E (2014) Survival factors for subcontractors in economic downturns. Journal of Construction Engineering and Management, 140(3): 4013056, ISSN 0733-9364

Owusu-Manu, D G; Badu, E; Holt, G D and Edwards, D (2015) Determinants of management innovation in the Ghanaian construction consulting sector. Construction Economics and Building, 15(1), pp. 75-88. ISSN 2204-9029

Owusu-Manu, D G; Ghansah, F A; Darko, A; Asiedu, R O and Edwards, D J (2020) Insurable and non-insurable risks in complex project deals: Case of the Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(6), pp. 1971-1995. ISSN 1726-0531

Oyefusi, O N; Enegbuma, W I and Brown, A (2025) From systematic literature review to performance criteria evaluation: advancing green supply chain management in construction. International Journal of Construction Management, 25(3), pp. 249-264. ISSN 1562-3599

Oyegoke, A S; Fisher, B W; Ajayi, S; Omotayo, T S and Ewuga, D (2024) The disruptive factors and longevity effects of covid-19 and brexit on the SMEs construction supply chain in the UK. Journal of Financial Management of Property and Construction, 29(1), pp. 115-134. ISSN 1366-4387

Oyenuga, A (2016) Economic and environmental impact assessment of construction and demolition waste recycling and reuse using LCA and MCDA management tools. PhD thesis, London South Bank University, UK.

Ozdemir, B and Kumral, M (2017) Stochastic assessment of the material haulage efficiency in the earthmoving industry. Journal of Construction Engineering and Management, 143(8): 05017013, ISSN 0733-9364

O’Connell, S; Reynders, G; Seri, F; Sterling, R and Keane, M M (2020) A standardised flexibility assessment methodology for demand response. International Journal of Building Pathology and Adaptation, 38(1), pp. 20-37. ISSN 23984708

Pablo, Z; London, K and Wong, P (2017) Adapting novel research techniques to analyse collaboration in offsite manufacturing housing construction innovations. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Pablo, Z; London, K; Wong, P S P and Khalfan, M (2021) Actor-network theory and the evolution of complex adaptive supply networks. Construction Innovation, 21(4), pp. 668-684. ISSN 1471-4175

Pablo, Z and London, K A (2020) Stable relationality and dynamic innovation: Two models of collaboration in SME-driven offsite manufacturing supply chains in housing construction. Engineering, Construction and Architectural Management, 27(7), pp. 1553-1577. ISSN 0969-9988

Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.

Pala, M (2018) Implementing inter-organisational information systems for the integration of construction supply chains. PhD thesis, Loughborough University, UK.

Pala, M; Edum-Fotwe, F; Ruikar, K; Peters, C and Doughty, N (2016) Implementing commercial information exchange: A construction supply chain case study. Construction Management and Economics, 34(12), pp. 898-918. ISSN 01446193

Palaneeswaran, E; Kumaraswamy, M and Ng, T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor selection. Engineering, Construction and Architectural Management, 10(6), pp. 418-431. ISSN 0969-9988

Palaneeswaran, E; Kumaraswamy, M M and Ng, S T (2003) Formulating a framework for relationally integrated construction supply chains. Journal of Construction Research, 4(2), pp. 189-205. ISSN 1609-9451

Palaniappan, S; Bashford, H; Li, K; Fafitis, A and Stecker, L (2009) Carbon emissions based on transportation for post-tensioned slab foundation construction: A production home building study in the greater phoenix arizona area. International Journal of Construction Education and Research, 5(4), pp. 236-260. ISSN 1557-8771

Palit, N (2017) Analysis of the project supply chains: coordination and fair allocation. PhD thesis, University of Sheffield, UK.

Pan, W; Chen, L and Zhan, W (2021) Positioning construction workers' vocational training of guangdong in the global political-economic spectrum of skill formation. Engineering, Construction and Architectural Management, 28(9), pp. 2489-2515. ISSN 0969-9988

Papadonikolaki, E; Verbraeck, A and Wamelink, H (2017) Formal and informal relations within BIM-enabled supply chain partnerships. Construction Management and Economics, 35(8-9), pp. 531-552. ISSN 01446193

Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2015) BIM adoption in integrated supply chains: A multiple case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2016) The interdependences of BIM and supply chain partnering: Empirical explorations. Architectural Engineering and Design Management, 12(6), pp. 476-494. ISSN 1745-2007

Papadonikolaki, E and Wamelink, H (2017) Inter- and intra-organizational conditions for supply chain integration with BIM. Building Research & Information, 45(6), pp. 649-664. ISSN 0961-3218

Parisi, L. and Donyavi, S. (2026) Advancing materials procurement processes in construction: A framework for optimising technology integration in SMEs' construction supply chains. International Journal of Construction Management, 26(7), pp. 1365-1389. ISSN 1562-3599

Park, A (2022) Essays on the theory of bargaining and economics of matching platforms. PhD thesis, University of California, Los Angeles, USA.

Pasqual, I R and Ekanayake, L (2025) Win–win approach to subcontracting in building construction: Sri Lankan perspective. Construction Economics and Building, 25(3-4), pp. 339-357. ISSN 2204-9029

Patcharachavalit, N; Limsawasd, C and Athigakunagorn, N (2023) Multiobjective optimization for improving sustainable equipment options in road construction projects. Journal of Construction Engineering and Management, 149(1): 04022160, ISSN 0733-9364

Patel, T; Bapat, H and Patel, D (2026) Assessing barriers of automation and robotics adoption in the Indian construction industry: A fuzzy DEMATEL approach. Construction Innovation, 26(3), pp. 935-957. ISSN 1471-4175

Pauli, L C (2023) Utilising the principles of blockchain technology for managing road infrastructure projects. PhD thesis, Liverpool John Moores University, UK.

Pellicer, T M; Pellicer, E and Eaton, D (2009) A macroeconomic regression analysis of the European construction industry. Engineering, Construction and Architectural Management, 16(6), pp. 573-597. ISSN 0969-9988

Peltokorpi, A; Olivieri, H; Granja, A D and Seppänen, O (2018) Categorizing modularization strategies to achieve various objectives of building investments. Construction Management and Economics, 36(1), pp. 32-48. ISSN 01446193

Peng, Z; Deng, W and Hong, Y (2019) Materials consumption, indoor thermal comfort and associated energy flows of urban residential buildings: Case studies from the cold climate zone of China. International Journal of Building Pathology and Adaptation, 37(5), pp. 579-596. ISSN 23984708

Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.

Perera, C S R and Gunatilake, S (2022) Value chain management in Sri Lankan construction industry: Contractor's perspective. International Journal of Construction Management, 22(16), pp. 3137-3147. ISSN 1562-3599

Perez Jimenez, P A (2019) An investigation into health and safety management by SMEs and the risk of corporate manslaughter prosecution. PhD thesis, University of Wolverhampton, UK.

Perkins, J A (1992) Institutionalizing transportation infrastructure investments and economic development: The role of state departments of transportation in multi-state economic development activities. PhD thesis, Georgia Institute of Technology, USA.

Perrucci, D V (2021) Methods for scenario modeling of post-disaster temporary housing. PhD thesis, Vanderbilt University, USA.

Petroutsatou, K and Giannoulis, P (2022) Analysis of construction machinery market: The case of Greece. International Journal of Construction Management, 22(9), pp. 1667-1674. ISSN 1562-3599

Pham, H T; Pham, T; Truong Quang, H and Dang, C N (2023) Impact of transformational leadership on green learning and green innovation in construction supply chains. Engineering, Construction and Architectural Management, 30(5), pp. 1883-1901. ISSN 0969-9988

Pham, H T; Pham, T; Truong Quang, H and Dang, C N (2023) Supply chain risk management research in construction: A systematic review. International Journal of Construction Management, 23(11), pp. 1945-1955. ISSN 1562-3599

Pheng, L S; Arain, F M and Fang, J W Y (2011) Applying just-in-time principles in the delivery and management of airport terminal buildings. Built Environment Project and Asset Management, 1(1), pp. 104-121. ISSN 2044-124X

Pheng, L S and Chuan, C J (2001) Just-in-time management of precast concrete components. Journal of Construction Engineering and Management, 127(6), pp. 494-501. ISSN 0733-9364

Pheng, L S and Hui, M S (1999) The application of JIT philosophy to construction: A case study in site layout. Construction Management and Economics, 17(5), pp. 657-668. ISSN 01446193

Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(2), pp. 67-81. ISSN 0961-3218

Pheng, L S and Tan, S K L (1998) How 'just-in-time' wastages can be quantified: Case study of a private condominium project. Construction Management and Economics, 16(6), pp. 621-635. ISSN 01446193

Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.

Pinfold, L (2018) Coupling innovative technology, space management and BIM processes with smart city management: Congested construction sites in urban centres in Cape Town South Africa. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Pinto Varela Alberte, E and de Oliveira Novelli, G (2026) Potential use of blockchain technology in construction supply chain management of Brazil. Construction Innovation, 26(1), pp. 97-122. ISSN 1471-4175

Piroozfar, P; Pomponi, F and Farr, E R P (2016) Life cycle assessment of domestic hot water systems: A comparative analysis. International Journal of Construction Management, 16(2), pp. 109-125. ISSN 1562-3599

Polat, G and Arditi, D (2005) The JIT materials management system in developing countries. Construction Management and Economics, 23(7), pp. 697-712. ISSN 01446193

Polat, G; Arditi, D; Ballard, G and Mungen, U (2006) Economics of on-site vs off-site fabrication of rebar. Construction Management and Economics, 24(11), pp. 1185-1198. ISSN 1466433X

Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364

Powell, A; Hassan, T; Dainty, A and Carter, C (2008) The under-representation of women in European construction research. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Pradhananga, P; Elzomor, M and Santi Kasabdji, G (2021) Identifying the challenges to adopting robotics in the US construction industry. Journal of Construction Engineering and Management, 147(5): 0733, ISSN 0733-9364

Proverbs, D G; Holt, G D and Olomolaiye, P O (1997) Factors influencing the choice of concrete supply methods. Building Research & Information, 25(3), pp. 176-184. ISSN 0961-3218

Purnomo, M R A; Anugerah, A R; Aulia, S F and Azzam, A (2021) A novel optimisation model in the collaborative supply chain with production time capacity consideration. Journal of Engineering, Design and Technology, 19(3), pp. 647-658. ISSN 1726-0531

Qian, L Z; Chen, T H; Anumba, C and Choy, C F (2017) Development of a web-based system for managing suppliers' performance and knowledge sharing in construction projects. Built Environment Project and Asset Management, 7(2), pp. 117-129. ISSN 2044-124X

Qian, X and Papadonikolaki, E (2021) Shifting trust in construction supply chains through blockchain technology. Engineering, Construction and Architectural Management, 28(2), pp. 584-602. ISSN 0969-9988

Qiao, S; Wang, Q; Guo, Z and Guo, J (2021) Collaborative innovation activities and BIM application on innovation capability in construction supply chain: Mediating role of explicit and tacit knowledge sharing. Journal of Construction Engineering and Management, 147(12): 04021168, ISSN 0733-9364

Quagraine, V K (2007) New strategies to improve the management capacity of contractors for labor-based methods in road rehabilitation in Ghana. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Rad, Mahyar Habibi (2022) Impact of lean construction on contractor performance and organisational resilience in post-disaster infrastructure projects. PhD thesis, University of New South Wales, Australia.

Rafi, M M; Lodi, S H; Ahmed, M; Kumar, A and Verjee, F (2016) Development of building inventory for Northern Pakistan for seismic risk reduction. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 501-520. ISSN 1759-5916

Raftery, J; Pasadilla, B; Chiang, Y H; Hui, E C M and Tang, B S (1998) Globalization and construction industry development: Implications of recent developments in the construction sector in Asia. Construction Management and Economics, 16(6), pp. 729-737. ISSN 01446193

Rahman, M M (2003) Revitalising construction project procurement through joint risk management. PhD thesis, University of Hong Kong, Hong Kong.

Rahman, S (2021) Supply chain integration and the impacts of information technology capabilities, organizational culture (i.e., customer orientation, buyer dependence), and environmental uncertainties (i.e., supply, demand, technology) on supply chain performance. PhD thesis, University of Wisconsin - Whitewater, USA.

Rainer, R K (1968) Predicting productivity of one or two elevators for construction of high-rise buildings. PhD thesis, Oklahoma State University, USA.

Ramachandra, T (2013) Exploring feasible solutions to payment problems in the construction industry in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Rameezdeen, R; Chileshe, N; Hosseini, M R and Lehmann, S (2016) A qualitative examination of major barriers in implementation of reverse logistics within the South Australian construction sector. International Journal of Construction Management, 16(3), pp. 185-196. ISSN 1562-3599

Rana, V.; Singh, V.; Singh, A. R.; Rao, M. S. and Kashyap, K. (2026) Promoting real estate sensitivity among AEC students: A board game-based approach to applied learning. Architectural Engineering and Design Management, 22(1), pp. 149-167. ISSN 1745-2007

Rana, Ansar Rehman (2024) A proposal to reduce the complexity of the Australian law of contract. PhD thesis, University of Adelaide, Australia.

Rasch, S B (1985) An examination of the wage contour hypothesis: Wage leadership in the united states construction industry. PhD thesis, University of Kansas, USA.

Rasdorf, W; Lewis, P; Arocho, I and Hummer, J (2015) Characterizing air pollutant emissions for highway construction projects. Smart and Sustainable Built Environment, 4(3), pp. 315-328. ISSN 2046-6099

Rasdorf, W J and Herbert, M J (1990) Bar coding in construction engineering. Journal of Construction Engineering and Management, 116(2), pp. 261-280. ISSN 0733-9364

Rasmussen, F N; Ganassali, S; Zimmermann, R K; Lavagna, M; Campioli, A and Birgisdóttir, H (2019) LCA benchmarks for residential buildings in Northern Italy and Denmark: Learnings from comparing two different contexts. Building Research & Information, 47(7), pp. 833-849. ISSN 0961-3218

Razak, D S A; Mills, G and Roberts, A (2016) External failure cost in construction supply chains. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Reeves, K (2002) Construction business systems in Japan: General contractors and subcontractors. Building Research & Information, 30(6), pp. 413-424. ISSN 0961-3218

Reis, Daniel da Costa (2020) Material flow and resource efficiency in the construction industry. PhD thesis, Universidade de São Paulo, Brazil.

Rempelos, G (2023) A whole life carbon model for railway track system interventions. PhD thesis, University of Southampton, UK.

Riaz, Z; Edwards, D J; Mackenzie, J and Thorpe, T (2006) Emerging information, communication and technology systems applied to construction vehicle safety. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ribeiro, F L and Lopes, J (2001) Construction supply chain integration over the internet and web technology. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ribeiro, F L and Lopes, J (2002) An approach to e-business in construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Rich, Jeffrey R (1993) Victorian building workers and unions 1856-90. PhD thesis, Australian National University, Australia.

Riggs, L S and Hills, J W (1991) Implications for U.S. Construction companies in 1992 european community. Journal of Construction Engineering and Management, 117(4), pp. 773-790. ISSN 0733-9364

Rizzi, Dario (2025) Tools for sustainable design strategies: Optimization of integrated BIM-blockchain technologies and protocols for the application of minimum environmental criteria. PhD thesis, Università degli Studi di Ferrara, Italy.

Robertson, Aaron D (2026) Towards a new housebuilding paradigm: A systems theory approach to supply chain reconfiguration. PhD thesis, University of Salford, UK.

Robinson, P and McIlwaine, S (2020) Losing ground: Adapting construction management approaches to permafrost retreat. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Robinson, W G (2019) Servitization as an ongoing process of changing: the case of ConstructCo. PhD thesis, University of Manchester, UK.

Robinson, W G; Chan, P W and Lau, T (2016) Sensors and sensibility: Examining the role of technological features in servitizing construction towards greater sustainability. Construction Management and Economics, 34(1), pp. 4-20. ISSN 01446193

Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.

Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193

Rockow, Z R and Ross, B E (2020) An areal openness model (AOM) for quantifying the "openness" of floor plans. International Journal of Building Pathology and Adaptation, 39(3), pp. 470-489. ISSN 23984708

Rodrigo, N; Perera, S; Senaratne, S and Jin, X (2024) Development of a blockchain-based embodied carbon estimator. Built Environment Project and Asset Management, 14(6), pp. 914-936. ISSN 2044-124X

Roehrich, J K and Lewis, M A (2010) Towards a model of governance in complex (product-service) inter-organizational systems. Construction Management and Economics, 28(11), pp. 1155-1164. ISSN 1466433X

Root, D and Thorpe, A (2001) Refocusing collaboration technologies in the construction supply chain: Looking beyond the organization. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Ross, A (2011) Supply chain management in an uncertain economic climate: A UK perspective. Construction Innovation, 11(1), pp. 5-13. ISSN 1471-4175

Rossi, Mônica Therezinha Bartie (2012) Social housing and associative management, evaluation of the programs promoted by the state government of São Paulo in the period of 1990 to 2008. PhD thesis, Universidade de São Paulo, Brazil.

Ruikar, K (2006) Business process implications of e-commerce in construction organisations. EngD thesis, Loughborough University, UK.

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Russell, M M; Howell, G; Hsiang, S M and Liu, M (2013) Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10): 04013008, ISSN 0733-9364

Rutten, M E J; Dorée, A G and Halman, J I M (2008) How companies without the benefit of authority create innovation through collaboration. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Rutten, Maarten (2016) Collaboration for innovation in the construction sector: Key actors and resource allocation decisions. PhD thesis, University of Twente, Netherlands.

Rwamamara, R; Norberg, H; Olofsson, T and Lagerqvist, O (2010) Using visualization technologies for design and planning of a healthy construction workplace. Construction Innovation, 10(3), pp. 248-266. ISSN 1471-4175

Rwamamara, R A (2007) Planning the healthy construction workplace through risk assessment and design methods. PhD thesis, Luleå University of Technology, Sweden.

Ryan, E C (2001) An economic analysis of the standard construction contract. PhD thesis, King's College London, UK.

Ryu, J; Diraneyya, M M; Haas, C T and Abdel-Rahman, E M (2021) Analysis of the limits of automated rule-based ergonomic assessment in bricklaying. Journal of Construction Engineering and Management, 147(2): 04020163, ISSN 0733-9364

Rönnberg, N; Ringdahl, R and Fredriksson, A (2023) Measurement and sonification of construction site noise and particle pollution data. Smart and Sustainable Built Environment, 12(4), pp. 742-764. ISSN 2046-6099

Saad, S; Alaloul, W S; Ammad, S and Qureshi, A H (2022) A qualitative conceptual framework to tackle skill shortages in offsite construction industry: A scientometric approach. Engineering, Construction and Architectural Management, 29(10), pp. 3917-3947. ISSN 0969-9988

Saade, M R M; da Silva, M G; Gomes, V; Franco, H G; Schwamback, D and Lavor, B (2014) Material eco-efficiency indicators for Brazilian buildings. Smart and Sustainable Built Environment, 3(1), pp. 54-71. ISSN 2046-6099

Sabharwal, A; Syal, M and Hastak, M (2009) Impact of manufactured housing component assembly redesign on facility layout and production process. Construction Innovation, 9(1), pp. 58-71. ISSN 1471-4175

Sacks, R and Harel, M (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management and Economics, 24(8), pp. 869-881. ISSN 1466433X

Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.

Sadiq, M and Khalfan, M M A (2025) Transitioning to a circular economy in the construction demolition industry: A bibliometric analysis. Built Environment Project and Asset Management, 15(3), pp. 518-534. ISSN 2044-124X

Sadoughi, A; Kouhirostami, M; Kouhirostamkolaei, M; Qi, B and Costin, A (2024) Autonomous building design for manufacturing and assembly: A systematic review of design application, challenges, and opportunities. Journal of Construction Engineering and Management, 150(9): 03124006, ISSN 0733-9364

Safa, M; Shahi, A; Haas, C T and Hipel, K W (2017) Construction contract management using value packaging systems. International Journal of Construction Management, 17(1), pp. 50-64. ISSN 1562-3599

Saffar, N (2020) The development of an offsite construction adoption strategic guideline for the Iraqi construction industry. PhD thesis, University of Salford, UK.

Sahin, O; Miller, D and Mohamed, S (2018) Value-based modelling: An Australian case of off-site manufactured buildings. International Journal of Construction Management, 18(1), pp. 34-52. ISSN 1562-3599

Said, H (2016) Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms. Journal of Construction Engineering and Management, 142(2): 04015071, ISSN 0733-9364

Said, H and El-Rayes, K (2011) Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6), pp. 421-431. ISSN 0733-9364

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175

Saini, M (2015) A framework for transferring and sharing tacit knowledge in construction supply chains within lean and agile processes. PhD thesis, University of Salford, UK.

Saini, M; Arif, M and Kulonda, D J (2018) Critical factors for transferring and sharing tacit knowledge within lean and agile construction processes. Construction Innovation, 18(1), pp. 64-89. ISSN 1471-4175

Saini, M; Arif, M and Kulonda, D J (2019) Challenges to transferring and sharing of tacit knowledge within a construction supply chain. Construction Innovation, 19(1), pp. 15-33. ISSN 1471-4175

Sajid, Z W; Khan, S A; Hussain, F; Ullah, F; Khushnood, R A and Soliman, N (2026) Assessing economic and environmental performance of infill materials through BIM: A life cycle approach. Smart and Sustainable Built Environment, 15(1), pp. 9-39. ISSN 2046-6099

Saka, A B; Olaore, F O and Olawumi, T O (2019) Post-contract material management and waste minimization: An analysis of the roles of quantity surveyors. Journal of Engineering, Design and Technology, 17(4), pp. 793-807. ISSN 1726-0531

Saka, N and Mudi, A (2007) Practices and challenges of supply chain management by building contracting firms in the Lagos metropolitan area. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.

Salem, O M (1999) Infrastructure construction and rehabilitation: Risk-based life cycle cost analysis. PhD thesis, University of Alberta, Canada.

Salman, A; Moselhi, O and Zayed, T (2013) Scheduling model for rehabilitation of distribution networks using MINLP. Journal of Construction Engineering and Management, 139(5), pp. 498-509. ISSN 0733-9364

Salminen, S (1995) Serious occupational accidents in the construction industry. Construction Management and Economics, 13(4), pp. 299-306. ISSN 01446193

Samarasinghe, D A S (2014) Building materials supply chains: An evaluative study of the New Zealand residential construction. PhD thesis, Auckland University of Technology, New Zealand.

Sandanayake, M; Kumanayake, R and Peiris, A (2022) Environmental impact assessments during construction stage at different geographic levels: a cradle-to-gate analysis of using sustainable concrete materials. Engineering, Construction and Architectural Management, 29(4), pp. 1731-1752. ISSN 0969-9988

Sandanayake, M; Zhang, G and Setunge, S (2022) Impediments affecting a comprehensive emission assessment at the construction stage of a building. International Journal of Construction Management, 22(3), pp. 453-463. ISSN 1562-3599

Santoso, D S (2009) The construction site as a multicultural workplace: A perspective of minority migrant workers in Brunei. Construction Management and Economics, 27(6), pp. 529-537. ISSN 1466433X

Sarhan, S; Pretlove, S; Elghaish, F; Matarneh, S and Mossman, A (2025) Sources of occupational stress in UK construction projects: An empirical investigation and agenda for future research. Smart and Sustainable Built Environment, 14(6), pp. 1701-1728. ISSN 2046-6099

Sarkar, D; Patel, H and Dave, B (2022) Development of integrated cloud-based internet of things (IoT) platform for asset management of elevated metro rail projects. International Journal of Construction Management, 22(10), pp. 1993-2002. ISSN 1562-3599

Saunders, L W (2013) Measuring safety attitude differences in the construction supply chain. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Sawant, R J (2008) The economics of large scale infrastructure project finance: An empirical examination of the propensity to project finance. PhD thesis, Tufts University, USA.

Schiller, G; Blum, A; Hecht, R; Oertel, H; Ferber, U and Meinel, G (2021) Urban infill development potential in Germany: Comparing survey and GIS data. Buildings & Cities, 2(1), pp. 36-54. ISSN 2632-6655

Schneider, K (2023) Three essays on investment-based asset pricing. PhD thesis, University of Manchester, UK.

Schoenwitz, M (2014) Aligning product and processes to customer needs in prefabricated house building. PhD thesis, Cardiff University, UK.

Schulte Jr., W D (1999) The effect of international corporate strategies and information and communication technologies on competitive advantage and firm performance: An exploratory study of the international engineering, procurement and construction (IEPC) industry. PhD thesis, George Washington University, USA.

Sciulli, G; Rizzo, P; Kurlander, J and Brozik, B (2025) A comparative analysis of three methodological frameworks for bridge asset management. Journal of Construction Engineering and Management, 151(5): 04025029, ISSN 0733-9364

Scott, Denis James (2025) A proof of concept of a project bank account (PBA) blockchain payment application for the construction industry. PhD thesis, University College London, UK.

Scullion, J (2002) Are deep approaches to learning possible in vocational degree courses in construction? A phenomenological inquiry. EdD thesis, Open University, UK.

Senaratne, S and Gunawardane, S (2015) Application of team role theory to construction design teams. Architectural Engineering and Design Management, 11(1), pp. 1-20. ISSN 1745-2007

Senaratne, S and Samaraweera, A (2015) Construction project leadership across the team development process. Built Environment Project and Asset Management, 5(1), pp. 69-88. ISSN 2044-124X

Seo, J; Lee, S and Seo, J (2016) Simulation-based assessment of workers' muscle fatigue and its impact on construction operations. Journal of Construction Engineering and Management, 142(11): 04016063, ISSN 0733-9364

Sergeeva, N and Radosavljevic, M (2009) The influence of individual characteristics on employee creative participation. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Sergeeva, N and Radosavljevic, M (2012) Idea contribution in construction: In search for evidence of the interface between idea generation and its implementation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Settembre Blundo, D; García-Muiña, F E; Pini, M; Volpi, L; Siligardi, C and Ferrari, A M (2019) Sustainability as source of competitive advantages in mature sectors: The case of ceramic district of Sassuolo (Italy). Smart and Sustainable Built Environment, 8(1), pp. 53-79. ISSN 2046-6099

Sewalk, S and Nietfeld, K (2013) Barriers preventing women from enrolling in construction management programs. International Journal of Construction Education and Research, 9(4), pp. 239-255. ISSN 1557-8771

Sha, K and Jiang, Z (2003) Improving rural labourers'status in China's construction industry. Building Research & Information, 31(6), pp. 464-473. ISSN 0961-3218

Shafiee, S; Piroozfar, P; Forberg, L F; Hansen, H N and Farr, E (2025) Enhancing efficiency and sustainability in construction: a product configurator for customizable off-site building solutions. Architectural Engineering and Design Management, 21(3), pp. 450-466. ISSN 1745-2007

Shahid, M. U.; Thaheem, M. J. and Arshad, H. (2023) Quantification and benchmarking of construction waste and its impact on cost: A case of Pakistan. Engineering, Construction and Architectural Management, 30(6), pp. 2304-2333. ISSN 0969-9988

Shahid, M U; Thaheem, M J and Arshad, H (2023) Quantification and benchmarking of construction waste and its impact on cost: a case of Pakistan. Engineering, Construction and Architectural Management, 30(6), pp. 2304-2333. ISSN 0969-9988

Shakantu, M W (2004) An investigation into building material and waste logistics: The case of Cape Town. PhD thesis, Glasgow Caledonian University, UK.

Shakantu, W; Muya, M; Tookey, J and Bowen, P (2008) Flow modelling of construction site materials and waste logistics: A case study from Cape Town, South Africa. Engineering, Construction and Architectural Management, 15(5), pp. 423-439. ISSN 0969-9988

Shakantu, W; Muya, M; Tookey, J and Bown, P (2008) Evaluating truck empty running in construction: A case study from Cape Town, South Africa. Construction Economics and Building, 8(2), pp. 41-49. ISSN 2204-9029

Shakantu, W; Tookey, J E and Bowen, P A (2003) The hidden cost of transportation of construction materials: An overview. Journal of Engineering, Design and Technology, 1(1), pp. 103-118. ISSN 1726-0531

Shammas-Toma, M; Seymour, D and Clark, L (1998) Obstacles to implementing total quality management in the UK construction industry. Construction Management and Economics, 16(2), pp. 177-192. ISSN 01446193

Shapira, A and Glascock, J D (1996) Culture of using mobile cranes for building construction. Journal of Construction Engineering and Management, 122(4), pp. 298-307. ISSN 0733-9364

Shapira, A and Goldenberg, M (2005) AHP-based equipment selection model for construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1263-1273. ISSN 0733-9364

Shapira, A and Goldenberg, M (2007) "Soft" considerations in equipment selection for building construction projects. Journal of Construction Engineering and Management, 133(10), pp. 749-760. ISSN 0733-9364

Sharafi, A; Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(2), pp. 87-103. ISSN 01446193

Sharma, S K and Singh, A P (2023) Urban logistics stakeholder priority assessment to improve urban planning policy. International Journal of Construction Management, 23(16), pp. 2869-2878. ISSN 1562-3599

Shaurette, M (2007) Assessment of webcam technology on teaching and learning in construction management education. PhD thesis, Purdue University, USA.

Sheffer, D A (2011) Innovation in modular industries: Implementing energy-efficient innovations in us buildings. PhD thesis, Stanford University, USA.

Shehadeh, A and Alshboul, O (2025) Game theory integration in construction management: A comprehensive approach to cost, risk, and coordination under uncertainty. Journal of Construction Engineering and Management, 151(5): 04025039, ISSN 0733-9364

Shen, L Y; Bao, H J; Wu, Y Z and Lu, W S (2007) Using bargaining-game theory for negotiating concession period for BOT-type contract. Journal of Construction Engineering and Management, 133(5), pp. 385-392. ISSN 0733-9364

Sherratt, F and Sherratt, S (2017) The road to hell: Worker health, safety and wellbeing within UK corporate social responsibility practices. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Shewchuk, J P and Guo, C (2012) Panel stacking, panel sequencing, and stack locating in residential construction: Lean approach. Journal of Construction Engineering and Management, 138(9), pp. 1006-1016. ISSN 0733-9364

Shi, C; Chen, Y; Hua, Y and Tang, Y (2023) Understanding subcontracting organizational arrangements for construction projects in China: Integrating capabilities and uncertainty. Engineering, Construction and Architectural Management, 30(6), pp. 2381-2399. ISSN 0969-9988

Shi, J; Hu, J; Ma, M and Wang, H (2021) An environmental impact analysis method of machine-tool cutting units based on LCA. Journal of Engineering, Design and Technology, 19(5), pp. 1192-1206. ISSN 1726-0531

Shi, L; He, Y and Onishi, M (2023) Effect of the internal agency problem on risk-sharing incentive contracts in public-private partnership projects. Journal of Construction Engineering and Management, 149(12): 04023126, ISSN 0733-9364

Shi, Q; Wang, Q and Guo, Z (2022) Knowledge sharing in the construction supply chain: Collaborative innovation activities and BIM application on innovation performance. Engineering, Construction and Architectural Management, 29(9), pp. 3439-3459. ISSN 0969-9988

Shields, R and West, K (2003) Innovation in clean-room construction: A case study of co-operation between firms. Construction Management and Economics, 21(4), pp. 337-344. ISSN 01446193

Shiha, A and El-Adaway, I H (2026) From ports to projects: Estimating the impact of supply chain volatility and trade policy changes on construction material prices. Journal of Construction Engineering and Management, 152(6): 04026064, ISSN 0733-9364

Shiha, A and El-Adaway, I H (2025) Localized multivariate statistical assessment of United States construction labor shortages. Journal of Construction Engineering and Management, 151(8): 04025097, ISSN 0733-9364

Shiha, A and El-adaway, I H (2025) Identifying early warning signs of construction labor shortages. Construction Management and Economics, 43(10), pp. 765-793. ISSN 0144-6193

Shiha, A and El-adaway, I H (2025) Forecasting state-level construction labor earnings for enhanced project cost control: An econometric and deep-learning analysis of the leading economic indicators. Journal of Construction Engineering and Management, 151(12): 04025198, ISSN 0733-9364

Shikweni, S (2018) Talent management in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Shirley, C L M (2000) Firm inventory behavior and the returns from infrastructure investment. PhD thesis, University of California, Berkeley, USA.

Shirzad Talatappeh, S and Lakzi, A (2020) Developing a model for investigating the impact of cloud-based systems on green supply chain management. Journal of Engineering, Design and Technology, 18(4), pp. 741-760. ISSN 1726-0531

Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities. PhD thesis, University of Nevada, Las Vegas, USA.

Shtub, A (1988) The integration of CPM and material management in project management. Construction Management and Economics, 6(4), pp. 261-272. ISSN 01446193

Shukor, A S A; Mohammad, M F; Mahbub, R and Ismail, F (2011) Supply chain integration challenges in project procurement in Malaysia: The perspective of IBS manufacturers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Siebelink, S; Voordijk, J T and Adriaanse, A (2018) Developing and testing a tool to evaluate BIM maturity: Sectoral analysis in the Dutch construction industry. Journal of Construction Engineering and Management, 144(8): 05018007, ISSN 0733-9364

Silva, Rodrigo Rogerio Cerqueira da (2025) 'Was it worth it in the end'? A study of civil engineering graduates engineering graduates from three private universities in São Paulo. PhD thesis, Universidade Estadual de Campinas, Brazil.

Silver, M L (1981) Craft production: Work and alienation in the construction industry. PhD thesis, Columbia University, USA.

Simatupang, T M and Sridharan, R (2016) A critical analysis of supply chain issues in construction heavy equipment. International Journal of Construction Management, 16(4), pp. 326-338. ISSN 1562-3599

Simu, K (2009) The construction site manager's impact on risk management performance. PhD thesis, Luleå University of Technology, Sweden.

Sing, C P; Love, P E D and Tam, C M (2012) Stock-flow model for forecasting labor supply. Journal of Construction Engineering and Management, 138(6), pp. 707-715. ISSN 0733-9364

Sing, M C P; Fung, I W H; Edwards, D J and Liu, H (2022) Dynamic construction site layout planning: An application of branch and bond algorithm. International Journal of Building Pathology and Adaptation, 40(4), pp. 523-538. ISSN 23984708

Singh, N; Dixit, A and Ashish, D K (2025) Modelling of critical success factors to improve the supply chain resilience for sustainable construction sector. Smart and Sustainable Built Environment, 14(6), pp. 1846-1878. ISSN 2046-6099

Singh, A (2011) Bayesian analysis for causes of failure at a water utility. Built Environment Project and Asset Management, 1(2), pp. 195-210. ISSN 2044-124X

Singh, A; Kumar, V; Mittal, A and Verma, P (2024) Identifying critical challenges to lean construction adoption. Construction Innovation, 24(1), pp. 67-105. ISSN 1471-4175

Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 0969-9988

Sjökvist, S; Francart, N; Balouktsi, M and Birgisdottir, H (2025) Embodied climate impacts in urban development: a neighbourhood case study. Buildings & Cities, 6(1), pp. 25-49. ISSN 2632-6655

Skrzypczak, I; Oleniacz, G; Leśniak, A; Zima, K; Mrówczyńska, M and Kazak, J K (2022) Scan-to-BIM method in construction: Assessment of the 3D buildings model accuracy in terms inventory measurements. Building Research & Information, 50(8), pp. 859-880. ISSN 0961-3218

Slattery, D K and Sumner, M R (2011) Leadership characteristics of rising stars in construction project management. International Journal of Construction Education and Research, 7(3), pp. 159-174. ISSN 1557-8771

Smadi, O G (2000) Knowledge-based expert system pavement management optimization. PhD thesis, Iowa State University, USA.

Small, E P (1999) Development of a methodology for the integration of seismic risk mitigation activities in project and network level bridge management systems. PhD thesis, State University of New York at Buffalo, USA.

Smith, J P; Burgett, J M and Ghosh, S (2025) Work values and related construction industry perceptions of US undergraduate construction management students. International Journal of Construction Education and Research, 21(4), pp. 444-460. ISSN 1557-8771

Smith, D J (2003) Ecological effects of roads: Theory, analysis, management, and planning considerations. PhD thesis, University of Florida, USA.

Smyth, H J and Thompson, N J (2005) Developing conditions of trust within a framework of trust. Journal of Construction Procurement, 11(2),

Soares, R (1999) User cost customization for a Florida bridge management system. PhD thesis, University of Florida, USA.

Sobotka, S P (1952) The influence of unions on wages and earnings of labor in the construction industry. PhD thesis, University of Chicago, USA.

Soe, Y (2017) Construction supply chain risk management framework for construction projects: case studies in Myanmar. PhD thesis, University of Birmingham, UK.

Soleimani, M and Shahandashti, M (2017) Comparative process-based life-cycle assessment of bioconcrete and conventional concrete. Journal of Engineering, Design and Technology, 15(5), pp. 667-688.

Son, P V H and Hieu, H T (2023) Logistics model for precast concrete components using novel hybrid ant lion optimizer (ALO) algorithm. International Journal of Construction Management, 23(9), pp. 1560-1570. ISSN 1562-3599

Songer, A D and Walker, B (2004) General contractor emotional intelligence in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sospeter, N. G.; Awuzie, B. O. and Ngowi, A. (2026) Restoring labour dignity: Analysing decent work improvement strategies in tanzania's circular construction supply chains. Built Environment Project and Asset Management, 16(3), pp. 578-596. ISSN 2044-124X

Soto Ortiz, S.; Kang, K.; Hubbard, B. and Besiktepe, D. (2026) Supply chain disruption risks in U.S. Construction industry: Post-pandemic perspectives. Construction Management and Economics, 44(9), pp. 703-720. ISSN 0144-6193

Squicciarini, M and Asikainen, A L (2011) A value chain statistical definition of construction and the performance of the sector. Construction Management and Economics, 29(7), pp. 671-693. ISSN 1466433X

Staal, A A G (2019) Managing innovative suppliers: Exploring company, procurement, and performance variables in New Zealand construction supply chains. PhD thesis, Auckland University of Technology, New Zealand.

Stamatiou, D R I; Kirytopoulos, K A; Ponis, S T; Gayialis, S and Tatsiopoulos, I (2019) A process reference model for claims management in construction supply chains: The contractors' perspective. International Journal of Construction Management, 19(5), pp. 382-400. ISSN 1562-3599

Standing, Barry (2025) The link between internal integration and financial performance in engineering and construction companies. PhD thesis, Queensland University of Technology, Australia.

Standing, N A (1999) Value engineering and the contractor. PhD thesis, University of Leeds, UK.

Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175

Steadman, P; Evans, S; Liddiard, R; Godoy-Shimizu, D; Ruyssevelt, P and Humphrey, D (2020) Building stock energy modelling in the UK: The 3DStock method and the London building stock model. Buildings & Cities, 1(1), pp. 100-119. ISSN 2632-6655

Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry. PhD thesis, Brunel University, UK.

Steele, K (2003) A methodology to facilitate the environmental comparison of bridge management strategies. PhD thesis, University of Surrey, UK.

Steiger, T L (1988) Working construction: Organization and control of the labor process. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Stevens, J D and Murray, A L (1994) Modified roof erection system. Journal of Construction Engineering and Management, 120(4), pp. 828-837. ISSN 0733-9364

Stewart, I C (2011) Profession and innovation in the experience of historical and contemporary commercial managers. PhD thesis, University of Manchester, UK.

Stewart, L (2022) Business strategies for reducing professional labor shortages within the u.S. Construction industry. DBA thesis, Walden University, USA.

Stewart, R A (2003) Lifecycle management of information technology (IT) projects in construction. PhD thesis, Griffith University, Australia.

Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses. PhD thesis, University of Alabama, USA.

Stubbs, D A (1975) Trunk stresses in construction workers. PhD thesis, University of Surrey, UK.

Sturges, J and Bates, M (2000) Thriving on chaos: The result of poor planning: Some views from the housebuilding sector. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Styhre, A; Wikmalm, L; Ollila, S and Roth, J (2012) Sociomaterial practices in engineering work: The backtalk of materials and the tinkering of resources. Journal of Engineering, Design and Technology, 10(2), pp. 151-167. ISSN 1726-0531

Styre, A (2017) Thinking about materiality: The value of a construction management and engineering view. Construction Management and Economics, 35(1-2), pp. 35-44. ISSN 0144-6193

Sugrue, D P (2021) Alternative financing for harbor infrastructure using big data analytics in the great lakes waterway. PhD thesis, University of Michigan, USA.

Sun, K (2020) Three essays on the construction labor market: Getting to work; safety at work; regulation work. PhD thesis, University of Utah, USA.

Sundquist, V; Gadde, L-E and Hulthén, K (2018) Reorganizing construction logistics for improved performance. Construction Management and Economics, 36(1), pp. 49-65. ISSN 0144-6193

Suriyanon, N; Sutheerawatthana, P; Rinchumphu, D and Suksawat, R (2025) Carbon footprint assessment of a precast concrete yard: A case study from Thailand. Construction Economics and Building, 25(2), pp. 43-68. ISSN 2204-9029

Sutterby, P; Wang, X; Li, H X and Ji, Y (2023) The impact of COVID-19 on construction supply chain management: An Australian case study. Engineering, Construction and Architectural Management, 30(8), pp. 3098-3122. ISSN 0969-9988

Suárez, J L; Gosselin, L and Lehoux, N (2023) Analysing value creation in social housing construction in remote communities: application to nunavik (Canada). Built Environment Project and Asset Management, 13(4), pp. 493-508. ISSN 2044-124X

Swai, L (2022) Development of a conceptual framework for enhancing payment practices in the UK construction industry. PhD thesis, Coventry University, UK.

Swallow, M and Zulu, S (2024) Enhancing collaboration and engagement using virtual reality within site safety planning. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 223-231. ISSN 17514304

Swan, W; Cooper, R; McDermott, P and Wood, G (2001) A review of social network analysis for the IMI Trust in Construction Project. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Swan, W; McDermott, P; Khalfan, M M A; Cooper, R; Rees, C and Wood, G (2005) The Development of Trust Inventory. Journal of Construction Procurement, 11(1),

Swider, S C (2008) Behind great walls: Modes of employment among migrant construction workers in China's informal labor market. PhD thesis, University of Wisconsin - Madison, USA.

Syben, G (1998) A qualifications trap in the German construction industry: Changing the production model and the consequences for the training system in the German construction industry. Construction Management and Economics, 16(5), pp. 593-601. ISSN 01446193

Szamocki, N; Kim, M K; Ahn, C R and Brilakis, I (2019) Reducing greenhouse gas emission of construction equipment at construction sites: Field study approach. Journal of Construction Engineering and Management, 145(9): 05019012, ISSN 0733-9364

Sözen, Z and Kucediluk, M A (1999) Secondary subcontracting in the Turkish construction industry. Construction Management and Economics, 17(2), pp. 215-220. ISSN 01446193

Taggart, M; Koskela, L and Rooke, J (2012) Collaborative supply chain practices during severe economic downturn in the republic of Ireland. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Tajani, F; Anelli, D; Di Liddo, F and Morano, P (2024) An innovative methodology for the assessment of the social discount rate: An application to the European states for ensuring the goals of equitable growth. Smart and Sustainable Built Environment, 13(5), pp. 1281-1309. ISSN 2046-6099

Tam, C M and Fung, I W H (1998) Effectiveness of safety management strategies on safety performance in Hong Kong. Construction Management and Economics, 16(1), pp. 49-55. ISSN 01446193

Tam, C M; Tong, T K L; Cheung, S O and Chan, A P C (2001) Genetic algorithm model in optimizing the use of labour. Construction Management and Economics, 19(2), pp. 207-215. ISSN 01446193

Tan, Q and Ye, M (2024) Allocation of environmental responsibilities in the prefabricated construction supply chain: Exploring the influence of government subsidies. Journal of Construction Engineering and Management, 150(11): 04024167, ISSN 0733-9364

Tan, W (2011) Managing lean projects: Understanding the structures of lean production. International Journal of Construction Management, 11(3), pp. 67-78. ISSN 1562-3599

Tan, Y; Xue, B and Cheung, Y T (2017) Relationships between main contractors and subcontractors and their impacts on main contractor competitiveness: An empirical study in Hong Kong. Journal of Construction Engineering and Management, 143(7): 05017007, ISSN 0733-9364

Tang, Y and Yao, H (2023) Watch out for the hidden costs of subcontracting in construction projects: The impacts of subcontractor dispersion. Journal of Construction Engineering and Management, 149(11): 04023113, ISSN 0733-9364

Tao, S; Yu, J; Zhu, J; Chen, S and Li, X (2026) Precast component production scheduling considering outsourcing and multiskilled resources. Journal of Construction Engineering and Management, 152(5): 04026040, ISSN 0733-9364

Tao, L; Wu, C; Chiang, Y H; Wong, F K W and Liang, S (2017) Generational perceptions of freedom-related work values: Hong Kong's implementation of a no-saturday-site-work policy in construction. Journal of Construction Engineering and Management, 143(7): 06017002, ISSN 0733-9364

Tao, X (2023) Distributed common data environment for secure BIM-based collaborative design using blockchain technology. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Tasselli, Nicola (2023) BIM digital integration for existing buildings: Processes and tools to foster technological innovation of added-value building systems applied to the 20th century built asset in emilia-romagna. PhD thesis, Università degli Studi di Ferrara, Italy.

Tatum, M C and Terrell, F (2012) Hurricane reconstruction in the United States Gulf Coast. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 199-219. ISSN 1759-5916

Tavares, V M M (2022) Life cycle assessment of prefabricated buildings towards a building stock approach. PhD thesis, Universidade de Coimbra, Portugal.

Taylor, M D (2022) A definition and valuation of the UK offsite construction sector: Ten years on. International Journal of Construction Management, 22(15), pp. 2877-2885. ISSN 1562-3599

Taylor, M S (2021) Strategic management accounting practices in medium sized UK construction companies: a mixed-methods approach. PhD thesis, Nottingham Trent University, UK.

Teizer, J (2016) Right-time vs real-time pro-active construction safety and health system architecture. Construction Innovation, 16(3), pp. 253-280. ISSN 1471-4175

Tennakoon, T M M P; Chileshe, N; Rameezdeen, R; Ochoa, J J and Samaraweera, A (2026) Enhancing supply chain resilience in offsite construction through the procurement strategy: A systematic literature review. Construction Innovation, 26(1), pp. 63-82. ISSN 1471-4175

Tennakoon, G A; Rameezdeen, R and Chileshe, N (2024) Walking the talk towards sustainable consumption: Interventions to promote the uptake of reprocessed construction materials. Engineering, Construction and Architectural Management, 31(7), pp. 2878-2899. ISSN 0969-9988

Tennakoon, T M M P; Chileshe, N; Rameezdeen, R; Ochoa, J J and Samaraweera, A (2025) Modelling the effect of transaction cost determinants and governance on Australian offsite construction supply chain resilience. Engineering, Construction and Architectural Management, 32(13), pp. 104-132. ISSN 0969-9988

Tennakoon, T M M P; Chileshe, N; Rameezdeen, R; Ochoa Paniagua, J; Samaraweera, A and Statsenko, L (2025) Uncertainties affecting the offsite construction supply chain resilience: A systematic literature review. Construction Innovation, 25(3), pp. 912-930. ISSN 1471-4175

Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Tennant, S and Fernie, S (2011) An alternative form of supply chain governance: Construction clans. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Tennant, S and Fernie, S (2013) Organizational learning in construction supply chains. Engineering, Construction and Architectural Management, 20(1), pp. 83-98. ISSN 0969-9988

Tennant, S and Fernie, S (2014) Theory to practice: A typology of supply chain management in construction. International Journal of Construction Management, 14(1), pp. 56-66. ISSN 1562-3599

Tennant, S; Fernie, S and Murray, M (2014) The myth of best practice through the lens of construction supply chain management. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Tennant, S; McCarney, M and Tong, M K L (2012) Re-engineering the construction supply chain: Transferring on-site activity off-site. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Teriö, O; Sorri, J; Kähkönen, K and Hämäläinen, J (2014) Environmental index for Finnish construction sites. Construction Innovation, 14(2), pp. 245-262. ISSN 1471-4175

Tetik, M; Peltokorpi, A; Seppänen, O; Leväniemi, M and Holmström, J (2021) Kitting logistics solution for improving on-site work performance in construction projects. Journal of Construction Engineering and Management, 147(1): 05020020, ISSN 0733-9364

Thangaraj, R K and Chan, T K (2012) The effects of the global financial crisis on the Australian building construction supply chain. Construction Economics and Building, 12(3), pp. 16-30. ISSN 2204-9029

Thi Binh, A D; Asif, M S; Fan, Y; Thi Cam, H L and Quang, H T (2026) The domino effect of risks on supply chain performance in disruptive times. International Journal of Construction Management, 26(4), pp. 583-603. ISSN 1562-3599

Thomas, A; Davis, B; Dadi, G B and Goodrum, P M (2013) Case study on the effect of 690 mpa (100 ksi) steel reinforcement on concrete productivity in buildings. Journal of Construction Engineering and Management, 139(11): 4013025, ISSN 0733-9364

Thomas, H R (2002) 2000 Peurifoy lecture: Construction practices in developing countries. Journal of Construction Engineering and Management, 128(1), pp. 1-7. ISSN 0733-9364

Thomas, H R; Heuer, D W and Filippelli, R L (1984) Settlement of construction jurisdictional disputes. Journal of Construction Engineering and Management, 110(2), pp. 165-177. ISSN 0733-9364

Thompson, D.; Chileshe, N.; Coggins, J. and Stevels, A. (2025) COVID-19 challenges on construction-related SMEs and response strategies: A scoping review. International Journal of Construction Management, 25(14), pp. 1649-1659. ISSN 1562-3599

Thompson, N J (2003) Relationship marketing and client trust towards contractors within the large private building sector of the UK construction industry. PhD thesis, Oxford Brookes University, UK.

Thomson, D S; Austin, S A; Root, D S; Thorpe, A and Hammond, J W (2006) A problem-solving approach to value-adding decision making in construction design. Engineering, Construction and Architectural Management, 13(1), pp. 43-61. ISSN 0969-9988

Thorpe, A; Dainty, A R J and Hatfield, H (2003) The realities of being preferred: Specialist subcontractor perspectives on restricted tender list membership. Journal of Construction Procurement, 9(1), pp. 47-55. ISSN 1358-9180

Thrassou, A (2002) Strategic marketing management of the small consultancy firm: The case of small Cypriot architectural and/or civil engineering firms. PhD thesis, University of Leeds, UK.

Thunberg, M (2016) Developing a framework for supply chain planning in construction. PhD thesis, Linköping University, Sweden.

Thunberg, M and Fredriksson, A (2018) Bringing planning back into the picture: how can supply chain planning aid in dealing with supply chain-related problems in construction? Construction Management and Economics, 36(8), pp. 425-442. ISSN 01446193

Thunberg, M and Fredriksson, A (2023) A model for visualizing cost shifts when introducing construction logistics setups. Construction Innovation, 23(4), pp. 757-774. ISSN 1471-4175

Thunberg, M; Rudberg, M and Gustavsson, T K (2014) Identifying and positioning construction supply chain planning problems. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Thunberg, M; Rudberg, M and Karrbom Gustavsson, T (2017) Categorising on-site problems: A supply chain management perspective on construction projects. Construction Innovation, 17(1), pp. 90-111. ISSN 1471-4175

Thunberg M, P F (2013) A logistics framework for improving construction supply chain performance. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Thurnell, D and Lee, I (2009) Subcontractors perceptions regarding bid shopping in auckland, New Zealand. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Thörnqvist, C and Woolfson, C (2012) When tender turns tough: Posted workers and the tendering regime in the Swedish construction industry. Construction Management and Economics, 30(7), pp. 525-533. ISSN 1466433X

Tibon, N R and Suiza, R M (2018) Quantification of seismic exposure and vulnerability of historic buildings in Metro Manila. International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 249-257. ISSN 1759-5916

Tiew, S Y; Aman Hashim, H and Zolkafli @ Zulkifly, U K (2025) Factors influencing the effectiveness of graduate architects as construction contract administrators (cca). Engineering, Construction and Architectural Management, 32(1), pp. 332-348. ISSN 0969-9988

Titus, S and Bröchner, J (2005) Managing information flow in construction supply chains. Construction Innovation, 5(2), pp. 71-82. ISSN 1471-4175

Toews, C D (1981) The regional economic and labor market impact of large-scale, rural, public works construction: A case study of the McClellan-Kerr Arkansas River Navigation System. PhD thesis, University of Texas at Austin, USA.

Tomkins, C D (2008) Allocation and pricing of water resources. PhD thesis, Stanford University, USA.

Tonetto, L M; Brust-Renck, P G; Ruecker, S; Fogliatto, F S and Pacheco, D A D J (2021) Differences in thinking styles across professionals with different academic backgrounds when developing a product. Architectural Engineering and Design Management, 17(1-2), pp. 3-16. ISSN 1745-2007

Tong, M K L; Akintoye, A; Kelly, J and Tookey, J (2003) Understanding construction supply chain relationships: An aetiological approach. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Tong, T K L and Tam, C M (2003) Fuzzy optimisation of labour allocation by genetic algorithms. Engineering, Construction and Architectural Management, 10(2), pp. 146-155. ISSN 0969-9988

Toor, S U R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), pp. 395-408. ISSN 1466433X

Touran, A and Asai, T (1987) Simulation of tunneling operations. Journal of Construction Engineering and Management, 113(4), pp. 554-568. ISSN 0733-9364

Touran, A; Sheahan, T C and Ozcan, E (1997) Rational equipment selection method based on soil conditions. Journal of Construction Engineering and Management, 123(1), pp. 85-88. ISSN 0733-9364

Tran, H and Carmichael, D G (2012) The likelihood of subcontractor payment: Downstream progression via the owner and contractor. Journal of Financial Management of Property and Construction, 17(2), pp. 135-152. ISSN 1366-4387

Treloar, G J; Love, P E D and Crawford, R H (2004) Hybrid life-cycle inventory for road construction and use. Journal of Construction Engineering and Management, 130(1), pp. 43-49. ISSN 0733-9364

Trinh Nguyen, C; Thi Thu Tra, P; Thi Cam Van, H and Nguyen, D (2024) Corruption, market structure, and industry competition in the Vietnamese construction sector. Construction Management and Economics, 42(1), pp. 54-69. ISSN 01446193

Trinius, W and Sjöström, C (2005) Service life planning and performance requirements. Building Research & Information, 33(2), pp. 173-181. ISSN 0961-3218

Troje, D and Gluch, P (2019) Social procurement in the real world: How employment requirements unfold in construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Trompf, Peggy (2012) Another brick in the wall: Responses of the state to workplace fatalities in the New South Wales construction industry. PhD thesis, University of Sydney, Australia.

Tsang, W-C (2021) Safety violations of the construction workers in Hong Kong: quantitative and qualitative analysis of the dynamics. PhD thesis, University of Hong Kong, Hong Kong.

Tserng, H P; Yin, S Y L and Li, S (2006) Developing a resource supply chain planning system for construction projects. Journal of Construction Engineering and Management, 132(4), pp. 393-407. ISSN 0733-9364

Tsimopoulou, V (2015) Economic optimisation of flood risk management projects. PhD thesis, Delft University of Technology, Netherlands.

Turner, M; Scott-Young, C and Holdsworth, S (2021) Resilience and well-being: A multi-country exploration of construction management students. International Journal of Construction Management, 21(8), pp. 858-869. ISSN 1562-3599

Tutt, D; Pink, S; Dainty, A R J and Gibb, A (2013) Building networks to work: An ethnographic study of informal routes into the UK construction industry and pathways for migrant up-skilling. Construction Management and Economics, 31(10), pp. 1025-1037. ISSN 1466433X

Tuuli, M M and Rowlinson, S (2007) Towards a conceptual framework of empowerment and job performance in project teams. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Tzortzatou, E P (2008) Culture impact in construction supply chain management. PhD thesis, University College London, UK.

Ucbenli, C (2010) A bargaining mechanism with incomplete information and its application in trilateral BOT negotiations. PhD thesis, Columbia University, USA.

Udeaja, Chika Emmanuel (2002) A decision support framework for construction material supply chain management using multi-agent systems. PhD thesis, London South Bank University, UK.

Uher, T E (1991) Risks in subcontracting: Subcontract conditions. Construction Management and Economics, 9(6), pp. 495-508. ISSN 01446193

Uher, T E and Runeson, G (1984) Pre-tender and post-tender negotiations in Australia. Construction Management and Economics, 2(3), pp. 185-192. ISSN 01446193

Uher, Thomas Edward (1990) The effect of risks and uncertainties on subcontract bid prices. Unpublished PhD thesis, University of New South Wales, Australia.

Umer, M; Wetzel, E M and Powell, C (2026) Advancing toward automated material counting and localization using RFID, a boston dynamics spot robot, and a Bayesian filter algorithm. Journal of Construction Engineering and Management, 152(1): 04025213, ISSN 0733-9364

Umer, Muhammad (2025) Spotting inventory: Autonomous item localization on active construction sites using a boston dynamics spot® with Bayesian filtering and object detection. PhD thesis, Auburn University, USA.

Umer, W; Yu, Y and Antwi Afari, M F (2022) Quantifying the effect of mental stress on physical stress for construction tasks. Journal of Construction Engineering and Management, 148(3): 04021204, ISSN 0733-9364

Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks. PhD thesis, Columbia University, USA.

Unsal, H I and Taylor, J E (2011) Modeling interfirm dependency: Game theoretic simulation to examine the holdup problem in project networks. Journal of Construction Engineering and Management, 137(4), pp. 284-293. ISSN 0733-9364

Upstill-Goddard, J; Glass, J; Dainty, A R J and Nicholson, I (2012) Integrating responsible sourcing in the construction supply chain. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Upstill-Goddard, J D (2016) Towards a framework to enable construction small and medium-sized enterprises (SMEs) to manage sustainability. EngD thesis, Loughborough University, UK.

Usman, A M and Abdullah, K (2024) Development of comprehensive energy usage impact and carbon footprint parameters for green building life cycle assessment. Journal of Engineering, Design and Technology, 22(4), pp. 1057-1081. ISSN 1726-0531

Uusitalo, P; Peltokorpi, A; Seppänen, O and Alhava, O (2024) Towards systemic transformation in the construction industry: A complex adaptive systems perspective. Construction Innovation, 24(7), pp. 341-368. ISSN 1471-4175

Vahidi, A (2025) Towards circular concrete: The implementation of circular concrete in the construction industry. PhD thesis, Delft University of Technology, Netherlands.

Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364

Valizadeh, M.; Azizi, M.; Hosseini, M. R. and Mahoor, P. (2026) A hybrid analysis of reverse logistics barriers in Iranian construction. Smart and Sustainable Built Environment, 15(3), pp. 1225-1254. ISSN 2046-6099

Van Den Berg, M; Voordijk, H; Adriaanse, A and Hartmann, T (2017) Experiencing supply chain optimizations: A serious gaming approach. Journal of Construction Engineering and Management, 143(11): 04017082, ISSN 0733-9364

Van de Ruitenbeek, H K M (2012) Evolutionary, unconscious design support for the architectural, engineering and construction industry. PhD thesis, Delft University of Technology, Netherlands.

VanVactor, J D (2011) Cognizant healthcare logistics management: Ensuring resilience during crisis. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 245-255. ISSN 1759-5916

Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.

Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.

Verma, M. and Yadav, P. (2025) Gig economy: Workplace incivility's impact through culture, digital skills, and well-being. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 116-123. ISSN 1751-4304

Veshosky, D A (1992) An investigation of factors that influence decisions by engineering firms concerning adoption of CAD/CAE systems. PhD thesis, Lehigh University, USA.

Vidalakis, C and Sommerville, J (2013) Transportation responsiveness and efficiency within the building supply chain. Building Research & Information, 41(4), pp. 469-481. ISSN 0961-3218

Vidalakis, C; Tookey, J E and Sommerville, J (2011) Logistics simulation modelling across construction supply chains. Construction Innovation, 11(2), pp. 212-228. ISSN 1471-4175

Vieira, Luiz de Brito Prado (2020) Analysis of technologies for recycling the waste generated in concrete production in ready mixed concrete plants. PhD thesis, Universidade de São Paulo, Brazil.

Vinodh, S; Selvaraj, T; Chintha, S K and K. E. K., V (2015) Development of value stream map for an Indian automotive components manufacturing organization. Journal of Engineering, Design and Technology, 13(3), pp. 380-399.

Vitorio Junior, P C and Kripka, M (2021) Fair wage potential as a tool for social assessment in building projects. Engineering, Construction and Architectural Management, 28(4), pp. 1295-1318. ISSN 0969-9988

Voordijk, H and Vrijhoef, R (2003) Improving supply chain management in construction: What can be learned from the aerospace industry? In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Vrijhoef, R (2011) Supply chain integration in the building industry: The emergence of integrated and repetitive strategies in a fragmented and project-driven industry. PhD thesis, Delft University of Technology, Netherlands.

Vrijhoef, R (2019) Studying time presence on site as an indicator of productive time use by construction workers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Vrijhoef, R and de Ridder, H (2008) Methodological challenges of knowledge production in construction management research: The case of a postgraduate research into supply chain integration. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Vásquez-Hernández, A.; Pellicer, E.; Alarcón, L. F.; Capellaro Ferreira, T. and Martínez, P. (2026) Breaking the mirror: How conventional construction firms embrace industrialized construction. Journal of Construction Engineering and Management, 152(10): 04026163, ISSN 0733-9364

Wagner, H E and Kulwiec, A (2022) Expanding pre-apprenticeship training programs as a model to improve recruitment and retention of building construction tradeswomen. International Journal of Construction Education and Research, 18(1), pp. 3-16. ISSN 1557-8771

Walsh, K D; Hershauer, J C; Tommelein, I D and Walsh, T A (2004) Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6), pp. 818-826. ISSN 0733-9364

Walter, T and Mathew, P (2021) GHG policy impacts for seattle's buildings: Targets, timing, and scope. Buildings & Cities, 2(1), pp. 283-301. ISSN 2632-6655

Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364

Wan Omar, Sabki (2015) Analysis of embodied energy and carbon in Malaysian building construction using hybrid life cycle assessment. PhD thesis, Griffith University, Malaysia.

Wang, Z.; Hu, X.; Wei, A.; Yang, W. and Dong, Z. (2026) A blockchain-based system for just-in-time in construction supply chains. Built Environment Project and Asset Management, 16(2), pp. 377-395. ISSN 2044-124X

Wang, B; Zhang, S; Wang, X and Feng, Z (2018) The influence of quality benefit and marginal contribution on the optimal equity structure of the PPP projects: Balancing public and private benefits. Construction Management and Economics, 36(11), pp. 611-622. ISSN 01446193

Wang, C; Loo, S C; Yap, J B H and Abdul-Rahman, H (2019) Novel capability-based risk assessment calculator for construction contractors venturing overseas. Journal of Construction Engineering and Management, 145(10): 04019059, ISSN 0733-9364

Wang, C; Zhang, S; Gao, Y; Guo, Q and Zhang, L (2023) Effect of contractual complexity on conflict in construction subcontracting: Moderating roles of contractual enforcement and organizational culture distance. Journal of Construction Engineering and Management, 149(5): 04023019, ISSN 0733-9364

Wang, C; Zhang, S; Gao, Y and Li, B (2022) Trust repair in the aftermath of conflict occurrence in construction subcontracting: An intergroup contact perspective. Construction Management and Economics, 40(10), pp. 781-795. ISSN 01446193

Wang, D (2013) Exploring factors associated with workers' safety rule violations in the Chinese construction industry: a multimethod investigation. PhD thesis, University of Nottingham, UK.

Wang, D; Luo, J and Wang, Y (2024) Multifactor uncertainty analysis of prefabricated building supply chain: Qualitative comparative analysis. Engineering, Construction and Architectural Management, 31(5), pp. 1994-2010. ISSN 0969-9988

Wang, H (2017) Construction project performance improvement through radio frequency identification technology application on a project supply chain. PhD thesis, Purdue University, USA.

Wang, H; Yi, W; Zhen, L and Chan, A P C (2024) Cost-optimized transport planning for prefabricated modules with the implementation of the just-in-time strategy. Journal of Construction Engineering and Management, 150(8): 04024093, ISSN 0733-9364

Wang, Liannian (2025) Advancing construction requirements management through 4D BIM and generative AI. PhD thesis, North Carolina State University, USA.

Wang, M (2014) Sensitivity analysis and evolutionary optimization for building design. PhD thesis, Loughborough University, UK.

Wang, M; Altaf, M S; Al-Hussein, M and Ma, Y (2020) Framework for an IoT-based shop floor material management system for panelized homebuilding. International Journal of Construction Management, 20(2), pp. 130-145. ISSN 1562-3599

Wang, Rui (2015) The virtual learning experience: Learning styles, task complexity and presence in the context of emerging VR technologies. PhD thesis, University of New South Wales, Australia.

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wang, W (2010) Multivariate stochastic copula-based deterioration models in infrastructure economic risk management. DES thesis, Columbia University, USA.

Wang, W; Guo, J; Tian, Q; Peng, Y; Yu, B and Cao, Z (2024) Layout optimization for stormwater harvesting facilities in coal ports considering stochasticity of underlying surface types. Journal of Construction Engineering and Management, 150(10): 04024132, ISSN 0733-9364

Wang, X; Du, M; Li, H X; Hasan, A and Ahmadian Fard Fini, A (2025) Gender inequality and challenges of women in the construction industry: An evidenced-based analysis from China. Engineering, Construction and Architectural Management, 32(13), pp. 213-233. ISSN 0969-9988

Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.

Wang, Zhuoyuan (2019) Effects of main contractors' service quality on subcontractors' behaviours and project outcomes in the Chinese construction industry. PhD thesis, University of New South Wales, Australia.

Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(2), pp. 153-163. ISSN 1466433X

Watson, A and McInnes, S (1997) Small/medium scale construction logistics: A study into the factors affecting planning accuracy. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Watts, G (2023) No winter for social value: The continued growth of a value focused construction industry. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Wee, T P Y (2019) Product planning of manufactured construction products. PhD thesis, Imperial College London, UK.

Welch, J A (2024) Ancient Maya labor relations: Constructing a palace at Ucanha, Yucatán, Mexico. PhD thesis, Yale University, USA.

Welfare, K S (2020) Perceptions of construction and the human factors climate through mixed methods. PhD thesis, University of Colorado at Boulder, USA.

Wells, J (2006) Labour subcontracting in the construction industries of developing countries: An assessment from two perspectives. Journal of Construction in Developing Countries, 11(1), pp. 17-36. ISSN 1823-6499

Wethyavivorn, P; Charoenngam, C and Teerajetgul, W (2009) Strategic assets driving organizational capabilities of Thai construction firms. Journal of Construction Engineering and Management, 135(11), pp. 1222-1231. ISSN 0733-9364

White, C; Lees, J M and MacAskill, K (2026) Bridging the information gap using targeted digital transformation: Process mapping large-scale concrete activity. Building Research & Information, 54(1), pp. 24-43. ISSN 0961-3218

Whiteman, D E (2002) The application of total quality management in construction field operations. PhD thesis, University of Florida, USA.

Wibowo, M A (2004) Modelling labour intensive construction and its effect on a developing economy. PhD thesis, University of Nottingham, UK.

Wijesekera, S (2022) Adaptation of green value chain strategy in industry sustainability of the cement manufacturing sector of Sri Lanka. DBA thesis, University of Wales Trinity Saint David, UK.

Wijewickrama, M. K. C. S.; Chileshe, N.; Rameezdeen, R. and Ochoa, J. J. (2026) Application of a Bayesian belief network-based information processing model for quality assurance in demolition waste reverse logistics: Insights from two case studies. Engineering, Construction and Architectural Management, 33(15), ISSN 0969-9988

Wijewickrama, M K C S; Chileshe, N; Rameezdeen, R and Ochoa, J J (2020) Best practices for diverting demolition waste from landfill: A systematic literature review. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Wijewickrama, M K C S; Chileshe, N; Rameezdeen, R and Ochoa, J J (2025) Information processing model for quality assurance in reverse logistics supply chains of demolition waste. Engineering, Construction and Architectural Management, 32(13), pp. 193-212. ISSN 0969-9988

Wijewickrama, M K C S; Chileshe, N; Rameezdeen, R and Ochoa, J J (2025) Integrating quality into the reverse logistics in construction: An empirical study in South Australia. Built Environment Project and Asset Management, 15(3), pp. 483-499. ISSN 2044-124X

Wijnia, Y C (2016) Processing risk in asset management: Exploring the boundaries of risk based optimization under uncertainty for an energy infrastructure asset manager. PhD thesis, Delft University of Technology, Netherlands.

Wikstrom, M R (1993) Four papers on wage formation in a unionized economy. PhD thesis, Umea Universitet, Sweden.

Wilkinson, S (1993) Entry to employment: Choices made by qualified women civil engineers leaving higher education. PhD thesis, Oxford Brookes University, UK.

Wilkinson, S; Piri, I S and Chang-Rihcards, Y (2017) Developing resilience in subcontracting organisations during disaster recovery. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Winch, G (1998) The growth of self-employment in British construction. Construction Management and Economics, 16(5), pp. 531-542. ISSN 01446193

Windapo, A; Moghayedi, A; Oliphant, D and Adediran, A (2018) Exploring the components of cost on construction projects. Journal of Construction Business and Management, 2(2), pp. 42-50. ISSN 2521-0165

Woldesenbet, A K (2014) Highway infrastructure data and information integration & assessment framework: A data-driven decision-making approach. PhD thesis, Iowa State University, USA.

Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193

Wong, J M W; Chan, A P C and Chiang, Y H (2010) Modeling construction occupational demand: Case of Hong Kong. Journal of Construction Engineering and Management, 136(9), pp. 991-1002. ISSN 0733-9364

Wong, J M W; Chan, A P C and Chiangn, Y H (2006) The changing construction labour market: A case of Hong Kong. Journal of Engineering, Design and Technology, 4(1), pp. 1-17. ISSN 1726-0531

Wong, J M W; Kong, H and Chiang, Y H (2004) A critical review of forecasting models to predict manpower demand. Construction Economics and Building, 4(2), pp. 43-56. ISSN 2204-9029

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, P S P; Cheung, S O and Chan, L L Y (2004) Enhancing construction value chain effectiveness in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wong, T K (1985) The effects of cyclical construction demand on the performance and operation of construction firms. PhD thesis, Massachusetts Institute of Technology, USA.

Wong, T K and Logcher, R D (1986) Contractors in cyclical economic environments. Journal of Construction Engineering and Management, 112(3), pp. 310-325. ISSN 0733-9364

Wong, W F and Cheah, C Y J (2004) Issues of contractual chain and sub-contracting in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Woo, J-H (2005) Sharing tacit design knowledge in a distributed design environment. PhD thesis, Texas A&M University, USA.

Wood, G and McDermott, P (2001) Building on trust: A co-operative approach to construction procurement. Journal of Construction Procurement, 7(2), pp. 4-14. ISSN 1358-9180

Woolcott, G; Loosemore, M; Keast, R; Meltzer, A and Alkilani, S (2025) Transitioning young people into employment in the Australian construction industry: The trust-building role of project-based intermediaries. Engineering, Construction and Architectural Management, 32(4), pp. 2571-2589. ISSN 0969-9988

Wu, L; Lu, W and Chen, C (2024) Strengths and weaknesses of client-server and peer-to-peer network models in construction projects. International Journal of Construction Management, 24(12), pp. 1349-1363. ISSN 1562-3599

Wu, M (2005) Modelling just-in-time purchasing in the ready mixed concrete industry. PhD thesis, National University of Singapore, Singapore.

Wu, P (2011) Application of the lean philosophy to reduce carbon emissions in the precast concrete industry of Singapore. PhD thesis, National University of Singapore, Singapore.

Wu, P; Feng, Y and Zhong, Y (2012) Identification and reduction of non-value adding activities in the precast concrete construction projects in Singapore. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Wu, S; Yu, L; Cao, T; Yuan, C and Du, Y (2023) How dependence asymmetry and explicit contract shape contractor-subcontractor collaboration: A psychological perspective of fairness. Journal of Construction Engineering and Management, 149(11): 04023103, ISSN 0733-9364

Wu, W; Mayo, G; McCuen, T L; Issa, R R A and Smith, D K (2018) Building information modeling body of knowledge. I: Background, framework, and initial development. Journal of Construction Engineering and Management, 144(8): 04018065, ISSN 0733-9364

Wuni, I Y and Shen, G Q (2022) Towards a decision support for modular integrated construction: An integrative review of the primary decision-making actors. International Journal of Construction Management, 22(5), pp. 929-948. ISSN 1562-3599

Wuni, I Y and Shen, G Q (2023) Exploring the critical success determinants for supply chain management in modular integrated construction projects. Smart and Sustainable Built Environment, 12(2), pp. 258-276. ISSN 2046-6099

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387

Wuni, I Y; Shen, G Q and Saka, A B (2023) Computing the severities of critical onsite assembly risk factors for modular integrated construction projects. Engineering, Construction and Architectural Management, 30(5), pp. 1864-1882. ISSN 0969-9988

Wuni, I Y; Shen, G Q P and Mahmud, A T (2022) Critical risk factors in the application of modular integrated construction: A systematic review. International Journal of Construction Management, 22(2), pp. 133-147. ISSN 1562-3599

Xenidis, Y and Angelides, D (2005) Identification and classification of risks in a new modelling process for build-operate-transfer projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 0969-9988

Xiong, W and Zhang, X (2016) The real option value of renegotiation in public-private partnerships. Journal of Construction Engineering and Management, 142(8): 4016021, ISSN 0733-9364

Xu, W; Du, W and Proverbs, D G (2025) The resilience of the construction supply chain to urban flooding. International Journal of Building Pathology and Adaptation, 43(7), pp. 1762-1791. ISSN 2398-4708

Xu, J; Shi, Y and Zhao, S (2019) Reverse logistics network-based multiperiod optimization for construction and demolition waste disposal. Journal of Construction Engineering and Management, 145(2): 04018124, ISSN 0733-9364

Xu, J and Smyth, H (2015) The value of trust in construction supply chains. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Xu, J and Zhao, S (2017) Noncooperative game-based equilibrium strategy to address the conflict between a construction company and selected suppliers. Journal of Construction Engineering and Management, 143(8): 04017051, ISSN 0733-9364

Xu, Jing (2019) The value of trust in construction supply chains. PhD thesis, University College London, UK.

Xu, Lichao (2019) Geometric, semantic, and system-level scene understanding for improved construction and operation of the built environment. PhD thesis, University of Michigan, USA.

Xu, Q; Hwang, B G; Choo, R Q; Zheng, X; Kong, L; Wang, Q C and Liu, X (2023) Comparison of construction project risks before and during COVID-19 in Singapore: Criticality and management strategies. Construction Management and Economics, 41(10), pp. 875-891. ISSN 01446193

Xu, W; Zhang, Y; Proverbs, D and Zhong, Z (2024) Enhancing the resilience of road networks to flooding. International Journal of Building Pathology and Adaptation, 42(2), pp. 213-236. ISSN 23984708

Xu, Yuqing (2025) Enhancing reliability and efficiency of upfront embodied carbon assessment leveraging openbim, llm, DES, and blockchain. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Yadav, N; Sadeghi, N and Kang, J (2024) Five factors affecting the on-body placement of wearable tactile safety promotion device for construction workers-on-foot. Construction Innovation, 24(2), pp. 537-557. ISSN 1471-4175

Yang, H; Li, H; Wang, G; Cao, D and Huang, B (2026) What drives workers into the labor-intensive Chinese construction industry: Profiling motivational diversity across heterogeneous groups. Journal of Construction Engineering and Management, 152(5): 05026002, ISSN 0733-9364

Yang, C (2023) Reliability-based methodology for design and evaluation of concrete bridge decks. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.

Yang, G (2017) Problematic encounters between Chinese nationals and black South Africans in the building industry in Johannesburg South Africa: An intercultural communication analysis. PhD thesis, University of Pretoria, South Africa.

Yang, H; Li, H; Wang, G and Cao, D (2025) Interregional migration of construction workers in China: Roles of employment opportunities and environment amenities. Engineering, Construction and Architectural Management, 32(1), pp. 87-108. ISSN 0969-9988

Yang, X L (2010) Research on general contracter and subcontractor cooperative management in construction. PhD thesis, Harbin Institute of Technology, China.

Yang, Y; Wei, Z; Zhang, Z and Xie, H (2025) Modeling the enablers for blockchain technology adoption in the construction supply chain. Journal of Construction Engineering and Management, 151(9): 04025113, ISSN 0733-9364

Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499

Yari, N (2018) New model for bridge management system (bms): Bridge repair priority ranking system (brprs), case based reasoning for bridge deterioration, cost optimization, and preservation strategy. PhD thesis, University of New Hampshire, USA.

Yashiro, T (2014) Conceptual framework of the evolution and transformation of the idea of the industrialization of building in Japan. Construction Management and Economics, 32(1-2), pp. 16-39. ISSN 01446193

Yavuz, Z B (2012) Impacts of participant related factors on rebar supply chain performance in SMEs. PhD thesis, Middle East Technical University, Turkey.

Ye, Y X; Shan, M; Gao, X; Li, Q and Zhang, H (2024) Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques. International Journal of Construction Management, 24(15), pp. 1617-1629. ISSN 1562-3599

Yi, W; Wang, H; Zhen, L; Song, Y and Xiao, B (2026) Strategic planning of modular construction hubs: A bilevel framework integrating governmental and industrial perspectives. Journal of Construction Engineering and Management, 152(5): 04026034, ISSN 0733-9364

Yin, H (2026) Construction project information system management framework strategy based on version control and collaboration. International Journal of Construction Management, 26(6), pp. 1033-1058. ISSN 1562-3599

Ying, F; Tookey, J and Roberti, J (2014) Addressing effective construction logistics through the lens of vehicle movements. Engineering, Construction and Architectural Management, 21(3), pp. 261-275. ISSN 0969-9988

Ying, F J; O'Sullivan, M and Adan, I (2021) Simulation of vehicle movements for planning construction logistics centres. Construction Innovation, 21(4), pp. 608-624. ISSN 1471-4175

Ying, J F; Tookey, J and Roberti, J (2015) SCM competencies in construction: Issues and challenges in New Zealand. Journal of Engineering, Design and Technology, 13(4), pp. 522-538.

Yong, K T and Pheng, L S (2008) Organizational culture and TQM implementation in construction firms in Singapore. Construction Management and Economics, 26(3), pp. 237-248. ISSN 1466433X

Yong-Woo, K and Rhee, B-D (2024) Incentive-based coordination for scheduled delivery in prefab construction. Construction Management and Economics, 42(7), pp. 624-639. ISSN 01446193

Yoo, W; Ozer, H and Ham, Y (2019) System-level approach for identifying main uncertainty sources in pavement construction life-cycle assessment for quantifying environmental impacts. Journal of Construction Engineering and Management, 145(2): 04018137, ISSN 0733-9364

Yoon, J H and Pishdad-Bozorgi, P (2022) State-of-the-art review of blockchain-enabled construction supply chain. Journal of Construction Engineering and Management, 148(2): 03121008, ISSN 0733-9364

Yoon, Jong Han (2023) Blockchain-enabled smart contract system for creating system-based trust in subcontracting process. PhD thesis, Georgia Institute of Technology, USA.

Yoon, Y J (2012) Planning of optimal rehabilitation strategies for infrastructure using time float and multiyear prioritization approach. PhD thesis, Purdue University, USA.

Young, B A (1988) Career development in construction management. PhD thesis, University of Manchester, UK.

Young, D R (1968) The development of a construction industry interest inventory. PhD thesis, Ohio State University, USA.

Yu, J; Wang, J; Shi, Q; Xu, J and Wang, J (2026) Exploring job competency related to intelligent construction in China using a text mining method. Engineering, Construction and Architectural Management, 33(1), pp. 318-335. ISSN 0969-9988

Yu, J; Zhong, H and Bolpagni, M (2024) Integrating blockchain with building information modelling (BIM): A systematic review based on a sociotechnical system perspective. Construction Innovation, 24(1), pp. 280-316. ISSN 1471-4175

Yu, R and Ma, L (2025) Risk evaluation of mega infrastructure construction supply chain in engineering-procurement-construction projects: An integrated fuzzy AHP and fuzzy DEMATEL approach. Engineering, Construction and Architectural Management, 32(5), pp. 3217-3235. ISSN 0969-9988

Yuan, C; McClure, T; Cai, H and Dunston, P S (2017) Life-cycle approach to collecting, managing, and sharing transportation infrastructure asset data. Journal of Construction Engineering and Management, 143(6): 04017001, ISSN 0733-9364

Yuan, Z; Fang, Y; Hong, J; Zhang, Q; Zhang, Z and Ni, G (2022) Coupling relationship between capabilities and benefits of lean construction for precast buildings from a multivariable moderation perspective. Journal of Construction Engineering and Management, 148(5): 04022011, ISSN 0733-9364

Yung, P (2009) Institutional arrangements and construction safety in China: An empirical examination. Construction Management and Economics, 27(5), pp. 439-450. ISSN 1466433X

Zaalouk, A; Altaf, M S and Han, S (2025) Operations-oriented supply chain master planning in panelized construction using hybrid multiagent simulation. Journal of Construction Engineering and Management, 151(10): 04025206, ISSN 0733-9364

Zainal Abidin, N A (2018) Resilience of Malaysian public sector construction industry to supply chain disruptions. PhD thesis, University of Huddersfield, UK.

Zainal Abidin, N A and Ingirige, B (2018) The dynamics of vulnerabilities and capabilities in improving resilience within Malaysian construction supply chain. Construction Innovation, 18(4), pp. 412-432. ISSN 1471-4175

Zaky, N; Ahmed, M Z; Alarjani, A and Attia, E A (2025) Lean manufacturing implementation in iron and steel industries: Effect of wastes management on the production costs. Journal of Engineering, Design and Technology, 23(2), pp. 525-545. ISSN 1726-0531

Zampese, Ednei Rogerio de Souza (2013) Green marketing as a mediating factor between green supply chain management and organizational performance in Brazilian civil construction. PhD thesis, Universidade Presbiteriana Mackenzie, Brazil.

Zeng, N; Liu, Y and König, M (2023) 4D BIM-enabled look-ahead scheduling for early warning of off-site supply chain disruptions. Journal of Construction Engineering and Management, 149(1): 04022154, ISSN 0733-9364

Zeng, N; Ye, X; Liu, Y and König, M (2024) BIM-enabled Kanban system in construction logistics for real-time demand reporting and pull replenishment. Engineering, Construction and Architectural Management, 31(8), pp. 3069-3096. ISSN 0969-9988

Zhan, W and Pan, W (2020) Formulating systemic construction productivity enhancement strategies. Journal of Construction Engineering and Management, 146(8): 05020008, ISSN 0733-9364

Zhan, Z; Dong, Y; Doe, D M; Hu, Y; Li, S; Cao, S; Li, W and Han, Z (2025) Deep learning and blockchain-driven contract theory: Alleviate gender bias in construction. Journal of Construction Engineering and Management, 151(3): 04024216, ISSN 0733-9364

Zhang, W; Ding, N; Xue, R; Han, Y and Liu, C (2025) Building success: The impact of talent recruitment on the growth of the construction industry. Engineering, Construction and Architectural Management, 32(9), pp. 5989-6005. ISSN 0969-9988

Zhang, Z.; Wang, Y.; Liu, J.; Wang, Y.; Liu, C. and Geng, X. (2026) Transport risk assessment for China's prefabricated construction supply chain: Integrating game theory and fuzzy Bayesian network. Engineering, Construction and Architectural Management, pp. 1-24. ISSN 0969-9988

Zhang, H and Yu, L (2020) Dynamic transportation planning for prefabricated component supply chain. Engineering, Construction and Architectural Management, 27(9), pp. 2553-2576. ISSN 0969-9988

Zhang, J; Li, H; Golizadeh, H; Zhao, C; Lyu, S and Jin, R (2020) Reliability evaluation index for the integrated supply chain utilising BIM and lean approaches. Engineering, Construction and Architectural Management, 27(5), pp. 997-1038. ISSN 0969-9988

Zhang, R; Chen, L and Sun, X (2024) The impact of COVID-19 on the financial performance of the UK construction firms. Construction Management and Economics, 42(10), pp. 867-885. ISSN 01446193

Zhang, S B; Chen, J and Fu, Y (2020) Contract complexity and trust in construction project subcontracting. Engineering, Construction and Architectural Management, 27(9), pp. 2477-2500. ISSN 0969-9988

Zhang, X; Skitmore, M; Wu, Y and Ye, K (2010) A regional construction R&D evaluation system for China. Construction Management and Economics, 28(12), pp. 1287-1300. ISSN 1466433X

Zhang, Xueyan (2024) Integrate blockchain to optimize the prefabrication supply chain management. PhD thesis, Griffith University, Australia.

Zhao, B; Yu, Y; Xu, Y and Guo, H (2024) Bamboo as a sustainable construction material for residential buildings in the cold and severe cold regions of China. Architectural Engineering and Design Management, 20(6), pp. 1511-1528. ISSN 1745-2007

Zhao, W; Peng, P; Liu, H; Wang, S and Liu, W (2025) How job satisfaction affects professionalization behavior of new-generation construction workers: A model based on theory of planned behavior. Engineering, Construction and Architectural Management, 32(4), pp. 2672-2696. ISSN 0969-9988

Zhao, Y (2016) Green supply chain management drivers/pressures, practices and performance in Chinese construction industry. PhD thesis, Anglia Ruskin University, UK.

Zheng, B; Hussain, M; Yang, Y; Chan, A P C and Chi, H L (2025) Trade-offs between accuracy and efficiency in BIM-LCA integration. Engineering, Construction and Architectural Management, 32(1), pp. 237-258. ISSN 0969-9988

Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364

Zheng, Y; Debs, L; Besiktepe, D and Oh, H J (2025) Insights for key professional competencies of us entry-level construction positions: A structural topic modeling approach. Journal of Construction Engineering and Management, 151(8): 04025103, ISSN 0733-9364

Zhong, S and Elzarka, H (2022) A hybrid grey system theory-based subcontractor selection model for high-stakes construction projects. Journal of Construction Engineering and Management, 148(6): 04022037, ISSN 0733-9364

Zhong, Z and Gou, Z (2023) High-rise apartment quality evaluation and related demographic factors: Lesson from rentsafeto programme. Building Research & Information, 51(4), pp. 430-445. ISSN 0961-3218

Zhou, C; Li, R; Xiong, X; Li, J and Gao, Y (2023) Optimization of triage time and sample delivery path in health infrastructure to combat COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3620-3644. ISSN 0969-9988

Zhou, H and Rezazadeh Azar, E (2019) BIM-based energy consumption assessment of the on-site construction of building structural systems. Built Environment Project and Asset Management, 9(1), pp. 2-14. ISSN 2044-124X

Zhou, Xiaoyan (2023) A reinforcement learning neural network approach to online optimization of construction manufacturing processes. PhD thesis, University of Florida, USA.

Zhou, Y; Wang, X; Gosling, J and Naim, M M (2023) The system dynamics of engineer-to-order construction projects: Past, present, and future. Journal of Construction Engineering and Management, 149(5): 03123004, ISSN 0733-9364

Zhu, H; Hwang, B G; Ngo, J and Tan, J P S (2022) Applications of smart technologies in construction project management. Journal of Construction Engineering and Management, 148(4): 04022010, ISSN 0733-9364

Zhu, J; Zhang, C; Yuan, J; Pan, W; Xue, J and Lou, F (2025) An improved model for precast component transportation scheduling under dynamic traffic and weather conditions. Journal of Construction Engineering and Management, 151(11): 04025181, ISSN 0733-9364

Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.

Zighan, S (2016) Servitization strategies in real estate development: Evidence from Jordan. PhD thesis, University of Huddersfield, UK.

Zou, P X W and Couani, P (2012) Managing risks in green building supply chain. Architectural Engineering and Design Management, 8(2), pp. 143-158. ISSN 1745-2007

Zou, P X W and Zhang, G (2009) Comparative study on the perception of construction safety risks in China and Australia. Journal of Construction Engineering and Management, 135(7), pp. 620-627. ISSN 0733-9364

Zughaibi, A M (1987) Construction productivity in Saudi Arabia: The influence of multinational labor force. PhD thesis, University of Texas at Austin, USA.

ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175

van Oorschot, John (2020) On the adoption of innovation in the housing sector. PhD thesis, University of Twente, Netherlands.

Çelik, G and Oral, E (2021) Mediating effect of job satisfaction on the organizational commitment of civil engineers and architects. International Journal of Construction Management, 21(10), pp. 969-986. ISSN 1562-3599

Çınar, S (2020) Construction labour, subcontracting and masculinity: "Construction is a man's job". Construction Management and Economics, 38(3), pp. 275-290. ISSN 01446193

Ó Murchadha, E and Murphy, R (2016) Rethinking apprenticeship training for the construction industry in Ireland. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Özkan-Özen, Y D; Akcicek, C and Ozturkoglu, Y (2025) Machine learning applications in smart logistics: Analysing barriers for future practices. Journal of Engineering, Design and Technology, 23(6), pp. 2105-2123. ISSN 1726-0531

Ürge-Vorsatz, D; Koeppel, S and Mirasgedis, S (2007) Appraisal of policy instruments for reducing buildings' CO2 emissions. Building Research & Information, 35(4), pp. 458-477. ISSN 0961-3218

This list was generated on Sat Aug 22 02:47:15 2026 UTC.