Theses from USA - University of Illinois at Urbana-Champaign

Number of items: 73.

Abdallah, M A A (2014) Optimizing the selection of sustainability measures for existing buildings. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Abdelmohsen, A Z (2016) Optimizing the construction planning of highway work zones. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Adrian, J J (1974) Modeling construction method productivity. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ahn, C (2012) An integrated framework for sustainable construction processes: Understanding and managing the environmental performance of construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Assaf, S A-E (1982) A systematic approach to the selection of a risk retention level for construction insurance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Aurangzeb, Q (2014) Impact of reclaimed asphalt pavements on pavement sustainability. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Barroso-Aguilar, L F (1973) An integrated modeling methodology for project-site management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Bearup, W K (1995) An environment to support computer-assisted design review. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Brilakis, I (2005) Content based integration of construction site images in AEC/FM model based systems. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Caldas, C H S (2003) Integration of project documents in model-based information systems. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Chin, S (1997) An integrated life-cycle information framework for construction project management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Chovichien, V (1981) The discounted cost model and application to acquisition and utilization policies of construction equipment. PhD thesis, University of Illinois at Urbana-Champaign, USA.

De La Garza-Rodriguez, J M (1988) A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Douglas, J C (1994) Aesthetic-based conflict in highway planning: Federal highway administration putting planners at risk. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Echeverry, D (1991) Factors for generating initial construction schedules. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Edstrom, C A (1972) Occupational training patterns and characteristics of selected personnel in the construction industry in Kinshasa. EdD thesis, University of Illinois at Urbana-Champaign, USA.

El Anwar, O H E D (2009) Multi-objective optimization for temporary housing arrangements after natural disasters. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Elghamrawy, T M (2011) Optimizing work zone practices for highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Erikson, C A (1979) Risk sharing in construction contracts. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Farid, F (1981) Fair and reasonable markup (FaRM) pricing model: A present value approach to pricing of construction contracts. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Gatton, T M (1991) Designing for construction automation: Advanced automation technologies for computer integrated construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Grimes, G A (2004) Recovering capital expenditures: The railroad industry paradox. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Grobler, F (1988) Object-oriented data representation for unified construction project information. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Halpin, D W (1973) An investigation of the use of simulation networks for modeling construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ham, Y (2015) Vision-based building energy diagnostics and retrofit analysis using 3D thermography and building information modeling. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Han, S (2013) Automated monitoring and systemic analysis of workers' safety behavior in construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Harris, J R (1980) Organization of building standards: Systematic techniques for scope and arrangement. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassanein, M A A G (1990) Mechanisms for transfer of price risk of construction materials. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Huang, P-D (1988) Impact of CADD technology on the architectural community. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kang, Y-J (2000) Minimum life-cycle cost structural design against natural hazards. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kangari, R (1982) Construction project selection under risk: Market model approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Karshenas, S (1981) Probabilistic evaluation of safety of buildings during construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kauffold, P V (1977) Critical resource allocation in stochastic project networks. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Khalafallah, A M (2006) Optimal construction site layout planning for airport expansion projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kim, C-S (2002) An information model for real-time project cost integration. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kim, H (2002) Knowledge discovery and machine learning in construction project databases. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kuipers, E J (1976) A method of forecasting the efficiency of construction labor in any climatological conditions. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Lee, J S (2005) Developing spatio-temporal models for retrofit and reconstruction strategy under unscheduled events. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Lin, K-Y (2005) Knowledge-assisted retrieval of online product information in A/E/C (architecture/engineering/construction). PhD thesis, University of Illinois at Urbana-Champaign, USA.

Lucenti Jr., M J (1999) Flexible computer support for collaboration in civil infrastructure management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Madunic, M (2008) Choosing a project team: The effects of interdependence and prior transacting in engineering, procurement and construction (EPC) projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Nakajima, T (1972) Modeling and optimization of the building process for systems building. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ndulue, J C A (1985) Urban black adaptation and successful entrepreneurship in chicago: An extended case study of a black-owned and operated construction industry. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Niss, J F (1965) Custom production, theory and practice: With special emphasis on the goals and pricing procedures of the contract construction industry. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Nunlee, M P (2002) Reputation as a control mechanism for opportunistic behavior in supply chains. PhD thesis, University of Illinois at Urbana-Champaign, USA.

O'Shaughnessy, R D (1992) Criteria civil engineers use in deciding whether or not to participate in non-credit continuing engineering education programs. EdD thesis, University of Illinois at Urbana-Champaign, USA.

Odeh, I S M (2010) Evaluation of glare and lighting performance in nighttime highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ojode, L A (2000) A resource -based view of strategic alliances: Organizational capabilities, governance, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Patel, A J (1996) Development of fatigue based pay adjustment factors in performance-related specifications for full-depth asphalt concrete pavements. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Pocock, J B (1996) The relationship between alternative project approaches, integration, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Rehak, D R (1981) Computer aided engineering problems and prospects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Richards, J L (1973) An integrated approach to construction management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Sarikas, R H (1981) Regulatory and financial aspects of the utility industry rate treatment of construction work in progress. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Shulenburger, D E (1974) The determination of negotiated wage change in the building construction industry. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Steiger, T L (1988) Working construction: Organization and control of the labor process. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Su, Y-Y (2010) Construction crew productivity monitoring supported by location awareness technologies. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Wang, H-H (2010) A context-based representation and reasoning formalism to support construction safety planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Zhang, J (2015) Automated code compliance checking in the construction domain using semantic natural language processing and logic-based reasoning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

This list was generated on Sat Aug 22 01:23:49 2026 UTC.