Theses from USA - Illinois Institute of Technology
Abeid, J N (2000) Photo-net: An integrated system for controlling the progress of construction activities. PhD thesis, Illinois Institute of Technology, USA.
Al-Musallam, A A (2002) A web-based approach for coordinating architectural drawings with other construction documents. PhD thesis, Illinois Institute of Technology, USA.
Al-Sobiei, O S (2001) Assessment of risk allocation in construction projects. PhD thesis, Illinois Institute of Technology, USA.
Alavipour, S M (2017) Project scheduling using optimized financing. PhD thesis, Illinois Institute of Technology, USA.
Alkoud, A (2023) Investigating the impact of tall building ordinances (TBOs) on the evolution of ultra-tall buildings typology: Case studies in Chicago and Dubai. PhD thesis, Illinois Institute of Technology, USA.
Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.
Alothaimeen, I (2018) Multi-objective optimization for LEED: New construction using genetic algorithms. PhD thesis, Illinois Institute of Technology, USA.
Barbarosoglu, B V (2018) Early detection of maintainability issues in MEP systems using BIM. PhD thesis, Illinois Institute of Technology, USA.
Chotibhongs, R (2011) Managing the bidding process for the construction owner-detection and prevention of unbalanced bids and collusive bids. PhD thesis, Illinois Institute of Technology, USA.
Gunaydin, H M (1999) Impact of information technologies on project management functions. PhD thesis, Illinois Institute of Technology, USA.
Gunhan, S M (2003) Foreign market entry decision model for construction companies. PhD thesis, Illinois Institute of Technology, USA.
Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions. PhD thesis, Illinois Institute of Technology, USA.
Ibrahim Mahmoud, M M (2005) An xml initiative of transferring architectural information to the construction site based on the BIM object concept. PhD thesis, Illinois Institute of Technology, USA.
Kale, Serdar (1999) Competitive advantage in the construction industry: Firm-specific resources and strategy. PhD thesis, Illinois Institute of Technology, USA.
Kaplanoglu, S B (2007) Impact of pre-project peer review on project success. PhD thesis, Illinois Institute of Technology, USA.
Kleps, S M (2013) Impact of workflow disruptions, project characteristics and foremen characteristics on improvisational decisions and actions on construction sites. PhD thesis, Illinois Institute of Technology, USA.
Koksal, A (2002) Predicting the development of decline in construction companies. PhD thesis, Illinois Institute of Technology, USA.
Le, K T (2017) Material inventory control and management system in construction using GIS applications and a "hybrid" tracking system. PhD thesis, Illinois Institute of Technology, USA.
Lee, D-E (2004) Construction business automation system (CBAS). PhD thesis, Illinois Institute of Technology, USA.
Lee, S H (2010) Optimal highway investment decision-making under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.
Ma, L (2022) A BIM-based life cycle assessment tool of embodied energy and environmental impacts of reinforced concrete tall buildings. PhD thesis, Illinois Institute of Technology, USA.
Mochtar, K (2000) Market-based pricing in construction. PhD thesis, Illinois Institute of Technology, USA.
Pandey, A R (2016) Heuristic decision-making model for electrical foremen when workflow is disrupted. PhD thesis, Illinois Institute of Technology, USA.
Pulket, T (2008) Universal prediction model for construction litigation. PhD thesis, Illinois Institute of Technology, USA.
Rashed, A (2022) Influence of internal factors in construction organizations on the implementation of integrated project delivery viewed from the organizational change theory. PhD thesis, Illinois Institute of Technology, USA.
Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration. PhD thesis, Illinois Institute of Technology, USA.
Rujirayanyong, T (2004) Data warehousing for construction. PhD thesis, Illinois Institute of Technology, USA.
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Satti, H M (2006) Integrating building code analysis within the architectural design process into the building information model. PhD thesis, Illinois Institute of Technology, USA.
Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.
Tokdemir, O B (2003) ALISS: Advanced linear scheduling system. PhD thesis, Illinois Institute of Technology, USA.
Yang, J (2022) Integrated decision support system for the selection and implementation of delay analysis in construction projects. PhD thesis, Illinois Institute of Technology, USA.
Yasamis, F (1999) Contractor quality performance (CQP) evaluation model in pavement projects. PhD thesis, Illinois Institute of Technology, USA.
Zhang, C (2013) Automated progress control using laser scanning technology. PhD thesis, Illinois Institute of Technology, USA.
Zhou, B (2012) Optimal decision-making of interdependent transportation investment alternatives under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.
Zhou, Q (2002) From CAD to IAD: An internet application of steel construction consulting for architects. PhD thesis, Illinois Institute of Technology, USA.
Up a level