Theses from USA - George Washington University

Number of items: 45.

Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects. DEng thesis, George Washington University, USA.

Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects. PhD thesis, George Washington University, USA.

Al-Gahtani, A S Z (1991) Construction claims for public and private projects in Saudi Arabia. DSc thesis, George Washington University, USA.

Alhabashi, M H (1991) Material management in the United States construction industry. DSc thesis, George Washington University, USA.

Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships. PhD thesis, George Washington University, USA.

Baggett, B L (1988) Analysis of the role of financial engineering in the marketing of major international construction projects. DBA thesis, George Washington University, USA.

Bahadir, M (2025) Predicting construction project durations in Europe using regression analysis methodology. DEngr thesis, George Washington University, USA.

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings. PhD thesis, George Washington University, USA.

Boyer, E J (2012) Building capacity for cross-sector collaboration: How transportation agencies develop skills and systems to manage public-private partnerships. PhD thesis, George Washington University, USA.

Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction. PhD thesis, George Washington University, USA.

Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.

Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.

Farmer, C M (2018) Constructing program management offices for major defense acquisition programs: Factors to consider. DEng thesis, George Washington University, USA.

Funches Allen, Dawn (2025) Analyzing factors that contribute to cost overruns on department of defense (dod) contractor programs. DEngr thesis, George Washington University, USA.

Griffin, M G (2008) The lived experience of first line managers during planned organizational change: A phenomenological study of one firm in the residential construction industry. EdD thesis, George Washington University, USA.

Guszcza, George K (2023) Bayesian cost-to-complete forecasting for architecture and engineering design. DEngr thesis, George Washington University, USA.

Habib, M R (1988) The relative effectiveness of large-scale public and private construction contractors: The case of Egypt. DSc thesis, George Washington University, USA.

Hanus, V P (2025) Predicting critical management-controlled factors to increase productivity within the construction industry. DEngr thesis, George Washington University, USA.

Hernandez Mendez, A (2018) Improving project performance through implementation of agile methodologies in the renewable energy construction industry. DEngr thesis, George Washington University, USA.

Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.

Innocent Jr., M J F (2018) Predicting military construction project time outcomes using data analytics. PhD thesis, George Washington University, USA.

Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola. PhD thesis, George Washington University, USA.

Kim, E (2000) A study on the effective implementation of earned value management methodology. DSc thesis, George Washington University, USA.

Krone, S J (1991) Decreasing the impact of changes. DSc thesis, George Washington University, USA.

Lee, S (2014) Re-examination of the enterprise resource planning success model in cross industry sectors: New statistical findings. PhD thesis, George Washington University, USA.

Lounsbury, C R (1983) From craft to industry: The building process in North Carolina in the nineteenth century. PhD thesis, George Washington University, USA.

McDavid, H A (1996) Construction and economic development: A stimulus or constraint in developing countries. DSc thesis, George Washington University, USA.

McLoud, M (1988) Craftsmen and entrepreneurs: Builders in late nineteenth-century Washington, D.C. PhD thesis, George Washington University, USA.

Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology. DEng thesis, George Washington University, USA.

Ngamthampunpol, D (2008) An assessment of safety management in the Thai construction industry. DSc thesis, George Washington University, USA.

Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.

Reid, J S (2019) Evaluating the impact of using agile methodologies in heavy-civil construction. DEng thesis, George Washington University, USA.

Schulte Jr., W D (1999) The effect of international corporate strategies and information and communication technologies on competitive advantage and firm performance: An exploratory study of the international engineering, procurement and construction (IEPC) industry. PhD thesis, George Washington University, USA.

Shamma, E M (1988) A dynamic model for the growth of construction firms. DSc thesis, George Washington University, USA.

Stout, Timothy J (2023) Schedule forecast optimization for the construction and commissioning of nuclear power plants. DEngr thesis, George Washington University, USA.

Stuban, S M F (2011) Employing risk management to control military construction costs. PhD thesis, George Washington University, USA.

Taku, A M (2021) Predicting modular efficiency in oil and gas capital projects using multi-criteria decision analysis. DEng thesis, George Washington University, USA.

Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea. DEng thesis, George Washington University, USA.

Tonimoghadam, F (2021) A predictive model for reducing cost and time for the detection of clashes in residential and commercial constructions projects. DEng thesis, George Washington University, USA.

Tudor, L G (1987) Modeling OSHA's inspection decision and the compliance decision of the firm. PhD thesis, George Washington University, USA.

Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri). DSc thesis, George Washington University, USA.

Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.

Yumul, John (2025) Evaluation of machine learning models to predict cost overruns for New York city capital projects. DEngr thesis, George Washington University, USA.

Zhou, G (2021) Machine learning-based cost predictive model for better operating expenditure estimations of U.S. light rail transit projects. EngD thesis, George Washington University, USA.

This list was generated on Sat Aug 22 01:24:04 2026 UTC.