Theses from UK - City, University of London
Akrawi, S G (1998) Sensing and real-time expert system for a masonry building robot. PhD thesis, City, University of London, UK.
Al-Sinan, M A (2004) TQM and the construction industry: Saudi Arabia: a case study. PhD thesis, City, University of London, UK.
Apostolopoulos, C (2015) Risk assessment for change management within project management: a hierarchical model process approach. PhD thesis, City, University of London, UK.
Arvanitis, D (2017) Collaboration and contract management in the context of offshore oil and gas contracts: an English law analysis. PhD thesis, City, University of London, UK.
Chua Ying Kit, J (1996) The human-machine interface (HMI) and re-bar detection aspects of a non-destructive testing (NDT) robot. PhD thesis, City, University of London, UK.
Eaglestone, F N (1993) An improved method of requesting insurance under UK construction contracts. PhD thesis, City, University of London, UK.
Kamanda-Kabague, B M (1981) Application of mathematical model techniques to the planning and control of overhead costs in the construction industry. PhD thesis, City, University of London, UK.
Meaker, T A (1994) The role of intervention in strategic change. PhD thesis, City, University of London, UK.
Sweis, R K (1988) Construction insurance in the Arab Gulf area: an analysis of cover and contracts. PhD thesis, City, University of London, UK.
Whittaker, J D (1970) A study of competitive bidding with particular reference to the construction industry. PhD thesis, City, University of London, UK.
Yeo, J T L (2007) Application of FBG-based sensors in built environment. PhD thesis, City, University of London, UK.
Up a level