Theses from Hong Kong - Hong Kong Polytechnic University

Number of items: 56.

Abdelkhalek, Sherif Ibrahim Farag Mohamed (2022) Managing the inspection process of concrete bridge decks. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Aoieong, Raymond Taiman (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM). PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Au, Chung Yu Maria (2013) An optimal contract strategy in managing extension of time provisions in building contracts. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Bao, Qi (2003) Effective energy management during a building's life cycle. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, K C G (2012) The use of virtual reality for visualizing construction safety management process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, P L (2004) Critical success factors for delivering healthcare projects in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, T S A (2005) The impact of subordinates' professionalism on leadership effectiveness in the construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, W T P (2009) Construction industry development and government policy. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, Y M T (2008) The role of finance in competitiveness of indigenous contractors in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chen, Z (2003) An integrated analytical approach to environmental management in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Fan, S (2009) The effect of using group decision support systems on the processes and outcomes of value management studies. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Fiona, T S C (2009) A critical study on performance-based fire safety design in Hong Kong with timber perforated ceilings as an example. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Fu, W K (2004) The effect of experience in construction contract bidding. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Hao, J L J (2002) Better use of information: A simulation model for international construction joint ventures in China. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Hon, K H (2012) Relationships between safety climate and safety performance of repair, maintenance, minor alteration and addition (RMAA) works. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Hong, J (2006) A study on analytic approaches to intelligent buildings assessment. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Kam, C W (2000) Quality assurance of construction works in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lee, L P (2012) Do construction workers accept automated monitoring? A study on the acceptance level and its antecedents. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liang, X (2012) Development of a framework for real-time 3D positioning and visualization of construction resources. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liang, Y (2006) Integrated IT systems for construction site management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lin, G (2009) Measuring the performance of value management studies in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liu, G W (2003) A framework for implementing value management in China's construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liu, Y (2009) Critical factors for managing project communication among participants at the construction stage. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lu, W (2006) A system for assessing and communicating contractors' competitiveness. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Pan, Y H (2007) Application of industrialized housing system in major cities in China: A case study of Chongqing. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Tan, Y (2009) Contractor's competitiveness and competitive strategy in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, K W J (2007) Development of selection evaluation and system intelligence analytic models for the intelligent building control systems. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, Y L P (2007) Facility management benchmarking: Measuring performances using multi-attribute decision tools. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yang, C (2004) Knowledge-based understanding and interpretation of construction engineering drawings. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yang, J (2010) A framework for stakeholder management in construction projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Ye, K (2009) Modelling competition intensity in construction market. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yeung, F Y (2007) Developing a partnering performance index (PPI) for construction projects: A fuzzy set theory approach. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yu, T W (2007) A value management framework for systematic identification and precise representation of client requirements in the briefing process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yuan, H (2011) A dynamic model for assessing the effectiveness of construction and demolition waste management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Zhang, X (2010) Competitiveness for real estate developers: a China study. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Zhou, Y (2012) Construction knowledge mining and application of generalized fuzzy network in construction decision management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

This list was generated on Sat Aug 22 01:23:30 2026 UTC.