Items with Subject: transportation engineering

Number of items: 455.

Ababutain, A Y (2002) A multi-criteria decision-making model for selection of BOT toll road proposals within the public sector. PhD thesis, University of Pittsburgh, USA.

Abdel Aziz, A M (2007) A survey of the payment mechanisms for transportation DBFO projects in British columbia. Construction Management and Economics, 25(5), pp. 529-543. ISSN 1466433X

Abdel Aziz, A M (2021) The practice of roadway safety management in public-private partnerships. Journal of Construction Engineering and Management, 147(12): 04021173, ISSN 0733-9364

Abdelaty, A; Jeong, H D; Dannen, B and Todey, F (2016) Enhancing life cycle cost analysis with a novel cost classification framework for pavement rehabilitation projects. Construction Management and Economics, 34(10), pp. 724-736. ISSN 0144-6193

Abdelkader, E M; Moselhi, O; Marzouk, M and Zayed, T (2021) Integrative evolutionary-based method for modeling and optimizing budget assignment of bridge maintenance priorities. Journal of Construction Engineering and Management, 147(9): 04021100, ISSN 0733-9364

Abdelkhalek, Sherif Ibrahim Farag Mohamed (2022) Managing the inspection process of concrete bridge decks. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Abdelmohsen, A Z (2016) Optimizing the construction planning of highway work zones. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Abdelmohsen, A Z and El-Rayes, K (2016) Optimal trade-offs between construction cost and traffic delay for highway work zones. Journal of Construction Engineering and Management, 142(7): 5016004, ISSN 0733-9364

Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029

Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects. PhD thesis, Oklahoma State University, USA.

Abu Dabous, S (2008) A decision support methodology for rehabilitation management of concrete bridges. PhD thesis, Concordia University, Canada.

Abu Dabous, S; Alzghoul, A and Ibrahim, F (2025) Intelligent condition prediction model for bridge infrastructure based on evaluating machine learning algorithms. Smart and Sustainable Built Environment, 14(2), pp. 557-576. ISSN 2046-6099

Acheng, P O; Kibwami, N; Mukasa, T J; Odongkara, B B; Birungi, R; Semanda, J and Manga, M (2023) Building information modelling adoption in uganda's construction industry. International Journal of Construction Management, 23(13), pp. 2185-2208. ISSN 1562-3599

Aggarwal, A; Rani, A and Kumar, M (2020) A robust method to authenticate car license plates using segmentation and ROI based approach. Smart and Sustainable Built Environment, 9(4), pp. 737-747. ISSN 2046-6099

Ahmed, A; Mohammed, H A; Gambatese, J and Hurwitz, D (2021) Effects of flashing blue lights mounted on paving equipment on vehicle speed behavior in work zones. Journal of Construction Engineering and Management, 147(9): 04021101, ISSN 0733-9364

Ahmed, Q A (1993) A knowledge-based system approach to work shift selection for multilane highway reconstruction and maintenance projects. PhD thesis, University of Florida, USA.

Ahn, Sang Jun (2019) Transportation framework in panelized construction for residential building. PhD thesis, University of Alberta, Canada.

Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK. PhD thesis, University of Salford, UK.

Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2003) Outsourcing the Risk Analysis Function in 'Private Finance Initiative' Projects. Journal of Construction Procurement, 9(1), ISSN 1358-9180

Al-Haddad, S (2020) State transportation agencies: A quantitative study on the use of construction engineering and inspection consultants and their impact on project performance. PhD thesis, University of Colorado at Boulder, USA.

Alameri, R and Esmaeili, B (2023) Progressive design-build delivery method: Assessment of project performance. International Journal of Construction Education and Research, 19(1), pp. 22-41. ISSN 1557-8771

Alankarage, S; Chileshe, N; Samaraweera, A; Rameezdeen, R and Edwards, D J (2022) Organisational culture in building information modelling maturity research: A bibliometric analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.

Alasad, R and Motawa, I (2015) Dynamic demand risk assessment for toll road projects. Construction Management and Economics, 33(10), pp. 799-817. ISSN 01446193

Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials. PhD thesis, Brunel University, UK.

Alhemoud, A M (1996) The development and testing of a comprehensive tool for assessing the effectiveness of occupational safety and health programs. PhD thesis, University of Cincinnati, USA.

Alleman, D and Lee, E B (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), pp. 2859-2891. ISSN 0969-9988

Alli, N; van Niekerk, A and Wilson, S (2012) Benefits of freeway investment through innovative procurement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 13-18. ISSN 17514304

Amorim, Aldo Siervo de (2016) Critical analysis of the economic and environmental feasibility of the civil construction waste recycling process at the municipal level. PhD thesis, Universidade de São Paulo, Brazil.

Amponsah, I (2008) Emerging civil infrastructure and environmental sustainability: Life-cycle assessment and multiobjective optimization. PhD thesis, University of South Carolina, USA.

Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.

Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364

Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364

Andrew, C and Thoms, I M (2012) Design and construction of the Gautrain rapid rail link. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 41-54. ISSN 17514312

Anthony, R; K. S, A; Prasanna, K and Sawhney, A (2025) An exploratory study on the application of digital twins in the Indian construction industry. International Journal of Construction Management, 25(9), pp. 996-1007. ISSN 1562-3599

Anthony Jnr, B (2025) A decentralized prototype framework for peer-to-peer based electric car sharing services towards sustainable road transportation. Smart and Sustainable Built Environment, 14(4), pp. 1172-1193. ISSN 2046-6099

Araujo, Adolpho Guido de (2021) Methodology for evaluation of environmental aspects in urban subdivision works in the pre-construction phase. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Artis, S (2007) The effects of perceived organizational support on training and safety in Latino and non-Latino construction workers. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Asao, K; Miyamoto, T; Kato, H and Diaz, C E D (2013) Comparison of revenue guarantee programs in build-operation-transfer projects. Built Environment Project and Asset Management, 3(2), pp. 214-227. ISSN 2044-124X

Ashuri, B; Kashani, H; Molenaar, K R; Lee, S and Lu, J (2012) Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management, 138(4), pp. 545-557. ISSN 0733-9364

Ashuri, B; Lu, J and Kashani, H (2011) A real options framework to evaluate investments in toll road projects delivered under the two-phase development strategy. Built Environment Project and Asset Management, 1(1), pp. 14-31. ISSN 2044-124X

Awuku, B; Asa, E and Baffoe-Twum, E (2024) Conceptual cost estimation of highway bid unit prices using ordinary kriging. International Journal of Construction Management, 24(3), pp. 351-360. ISSN 1562-3599

Awuku, B; Asa, E; Baffoe-Twum, E and Essegbey, A (2024) Conceptual cost estimation of highway bid items: a systematic literature review. Engineering, Construction and Architectural Management, 31(3), pp. 1187-1221. ISSN 0969-9988

Ayodele, O A; Chang-Richards, Y and González, V A (2022) A framework for addressing construction labour turnover in New Zealand. Engineering, Construction and Architectural Management, 29(2), pp. 601-618. ISSN 0969-9988

Aziz, Z; Qasim, R M and Wajdi, S (2017) Improving productivity of road surfacing operations using value stream mapping and discrete event simulation. Construction Innovation, 17(3), pp. 294-323. ISSN 1471-4175

Baek, M and Ashuri, B (2019) Analysis of the variability of submitted unit price bids for asphalt line items in highway projects. Journal of Construction Engineering and Management, 145(4): 04019020, ISSN 0733-9364

Bahadur, A V (2014) Policy climates and climate policies: analysing the politics of building resilience to climate change. PhD thesis, University of Sussex, UK.

Baharuddin, H E A; Ibrahim, C K I C; Costello, S B and Wilkinson, S (2017) Managing stakeholders through alliances: A case study of a megaproject in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 151-160. ISSN 17514304

Bajar, K; Kamat, A; Shanker, S and Barve, A (2024) Blockchain technology: A catalyst for reverse logistics of the automobile industry. Smart and Sustainable Built Environment, 13(1), pp. 133-178. ISSN 2046-6099

Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099

Besklubova, S; Zhong, R Y and Tan, B Q (2025) An integrated model of a prefabrication hub feasibility assessment: A Hong Kong case. International Journal of Construction Management, 25(11), pp. 1300-1312. ISSN 1562-3599

Bhanu, A C (2024) Integrating artificial intelligence and augmented reality for enhanced task performance in the construction industry. PhD thesis, Clemson University, USA.

Bhardwaj, A and Sharma, R K (2020) Effect of industrial wastes and lime on strength characteristics of clayey soil. Journal of Engineering, Design and Technology, 18(6), pp. 1749-1772. ISSN 1726-0531

Bhattacharya, A; Metcalf, A R; Nafchi, A M and Mousavi, E S (2021) Particle dispersion in a cleanroom–effects of pressurization, door opening and traffic flow. Building Research & Information, 49(3), pp. 294-307. ISSN 0961-3218

Bhattacharya, K; Sarkar, D and Chaturvedi, S (2025) A comprehensive study incorporating structural equation modeling and factor analysis study on the evaluation of performance criteria for infrastructure development projects. International Journal of Construction Management, 25(5), pp. 594-603. ISSN 1562-3599

Biswas, P K; Khan, S M; Piratla, K and Chowdhury, M (2023) Development and evaluation of statistical and machine-learning models for queue-length estimation for lane closures in freeway work zones. Journal of Construction Engineering and Management, 149(5): 04023023, ISSN 0733-9364

Bouhmoud, H; Loudyi, D and Azhar, S (2024) Building information modeling (BIM) for lifecycle carbon emission: Scientometric and scoping literature reviews. Smart and Sustainable Built Environment, 13(6), pp. 1349-1369. ISSN 2046-6099

Boyd, D and Taft, A (2016) Identifying the complex information requirements of sustainable drainage systems. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Boyer, E J (2012) Building capacity for cross-sector collaboration: How transportation agencies develop skills and systems to manage public-private partnerships. PhD thesis, George Washington University, USA.

Brandao, L E T and Saraiva, E (2008) The option value of government guarantees in infrastructure projects. Construction Management and Economics, 26(11), pp. 1171-1180. ISSN 1466433X

Burke, R (2014) Risk management in Republic of Ireland PPP toll roads. PhD thesis, Queen's University Belfast, UK.

Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level. PhD thesis, KTH Royal Institute of Technology, Sweden.

Buyukyoran, F and Gundes, S (2018) Optimized real options-based approach for government guarantees in PPP toll road projects. Construction Management and Economics, 36(4), pp. 203-216. ISSN 01446193

Bypaneni, S P K (2017) A Bayesian network-based decision framework for selecting project delivery methods in highway construction. PhD thesis, University of Kansas, USA.

Cable, J K; Jaselskis, E J; Walters, R C; Li, L and Bauer, C R (2009) Stringless Portland cement concrete paving. Journal of Construction Engineering and Management, 135(11), pp. 1253-1260. ISSN 0733-9364

Cai, H; Kuczek, T; Dunston, P S and Li, S (2017) Correlating intelligent compaction data to in situ soil compaction quality measurements. Journal of Construction Engineering and Management, 143(8): 04017038, ISSN 0733-9364

Callaghan, N; Avery, T and Mulville, M (2017) Smart motorway' innovation for achieving greater safety and hard shoulder management. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Calvert, G S (2021) A multiple defect approach to bridge life cycle modelling. PhD thesis, University of Nottingham, UK.

Cao, W (2019) Data interpretation for infrastructure system diagnosis and prognosis based on model falsification. PhD thesis, National University of Singapore, Singapore.

Capace, Brunella (2019) NDT application in transport asset management: Qa/qc performance specifications in pavement construction and maintenance. PhD thesis, Università degli Studi di Catania, Italy.

Carbonara, N; Costantino, N and Pellegrino, R (2014) Revenue guarantee in public-private partnerships: A fair risk allocation model. Construction Management and Economics, 32(4), pp. 403-415. ISSN 01446193

Carmichael, D G; Nguyen, T A and Shen, X (2019) Single treatment of PPP road project options. Journal of Construction Engineering and Management, 145(2): 04018122, ISSN 0733-9364

Carr, R I (2000) Construction congestion cost (CO3) basic model. Journal of Construction Engineering and Management, 126(2), pp. 105-113. ISSN 0733-9364

Carr, R I (2000) Construction congestion cost (CO3) traffic impact and construction cost. Journal of Construction Engineering and Management, 126(2), pp. 114-121. ISSN 0733-9364

Carrière, S; Weigend Rodríguez, R; Pey, P; Pomponi, F and Ramakrishna, S (2020) Circular cities: The case of Singapore. Built Environment Project and Asset Management, 10(4), pp. 491-507. ISSN 2044-124X

Carter, A (2022) Perceptions of construction trade careers amid a growing labor shortage: An exploratory study. PhD thesis, Wilmington University (Delaware), USA.

Cass, D and Mukherjee, A (2011) Calculation of greenhouse gas emissions for highway construction operations by using a hybrid life-cycle assessment approach: Case study for pavement operations. Journal of Construction Engineering and Management, 137(11), pp. 1015-1025. ISSN 0733-9364

Castelblanco, G and Guevara, J (2024) Stakeholder dynamics: Rethinking roles and responsibilities in user-pay transport PPP projects. Journal of Construction Engineering and Management, 150(8): 05024009, ISSN 0733-9364

Castelblanco, G; Guevara, J; Mangano, G and Rafele, C (2024) Financial system dynamics model for multidimensional flexibility in toll road PPPs: a life-cycle analysis. Construction Management and Economics, 42(9), pp. 802-821. ISSN 01446193

Castelblanco, G; Mangano, G; Zenezini, G and De Marco, A (2025) Once concessioned, twice shy? Asymmetries of "reconcession" in national PPP programs. Construction Management and Economics, 43(6), pp. 405-427. ISSN 0144-6193

Cevallos, O A; Jaramillo, D; Ávila, C and Aldaz, X (2017) Production and quality levels of construction materials in Andean regions: A case study of Chimborazo, Ecuador. Journal of Construction in Developing Countries, 22(1), pp. 115-136. ISSN 1823-6499

Chau, A D; Hoang, H T and Nguyen, L D (2025) Web-based decision support system for automated pavement design and life-cycle cost analysis. Journal of Construction Engineering and Management, 151(8): 05025004, ISSN 0733-9364

Chen, C (2007) Institutional barriers to private participation in infrastructure: The case of electronic toll collection in Taiwan. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Chen, C (2008) Risks in PPP: Process and institutional analyses. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Chen, C and Messner, J (2011) Characterizing entry modes for international construction markets: Paving the way to a selection model. Engineering, Construction and Architectural Management, 18(6), pp. 547-567. ISSN 0969-9988

Chen, C-H (2003) Integrated management of highway maintenance and traffic. PhD thesis, University of Maryland, College Park, USA.

Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.

Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, Y (2008) A highway work zone design and traffic management decision system. PhD thesis, University of Wisconsin - Madison, USA.

Cherkos, F D and Jha, K N (2021) Drivers of road sector public-private partnership adoption in new and inexperienced markets. Journal of Construction Engineering and Management, 147(3): 04020186, ISSN 0733-9364

Chi, Sae (2018) Developing a methodology for evaluating privately operated toll road projects using stochastic cost-benefit analysis. PhD thesis, Queensland University of Technology, Australia.

Cho, Y; Kabassi, K; Pyeon, J H; Choi, K; Wang, C and Norton, T (2013) Effectiveness study of methods for removing temporary pavement markings in roadway construction zones. Journal of Construction Engineering and Management, 139(3), pp. 257-266. ISSN 0733-9364

Cho, Y; Wang, C and Zhuang, Z (2013) Framework for empirical process to improve nonnuclear gauge performance in hot-mix asphalt pavement construction. Journal of Construction Engineering and Management, 139(6), pp. 601-610. ISSN 0733-9364

Cho, Y K; Bode, T; Song, J and Jeong, J H (2012) Thermography-driven distress prediction from hot mix asphalt road paving construction. Journal of Construction Engineering and Management, 138(2), pp. 206-214. ISSN 0733-9364

Choi, K (2008) Applications of ITS archived data for improved highway planning and design. PhD thesis, University of Wisconsin - Madison, USA.

Choi, K; Lee, H W; Bae, J and Bilbo, D (2016) Time-cost performance effect of change orders from accelerated contract provisions. Journal of Construction Engineering and Management, 142(3): 04015085, ISSN 0733-9364

Chong, H Y; Fan, S L; Sutrisna, M; Hsieh, S H and Tsai, C M (2017) Preliminary contractual framework for BIM-enabled projects. Journal of Construction Engineering and Management, 143(7): 04017025, ISSN 0733-9364

Chritamara, S (2017) An application of the real option framework to large infrastructure projects: evidence for Thailand's transportation system. PhD thesis, University of Newcastle upon Tyne, UK.

Chu, L (2017) Incorporation of functional considerations in highway pavement design and operations. PhD thesis, National University of Singapore, Singapore.

Chung, Demi (2012) Contractual approach to optimising risk sharing: A quantitative study of the multidimensional nature of risk in private provision of road infrastructure. PhD thesis, University of Sydney, Australia.

Chung, J H (2015) Optimizing financial structure of transportation public-private partnership infrastructure projects based on traffic revenue risks: Case study of US DBFOM project. PhD thesis, University of Florida, USA.

Conteh, Augustine (2023) Values of real assets: Focus on infrastructure and housing in Australia. PhD thesis, Griffith University, Australia.

Cruz Rios, F; Grau, D and Bilec, M (2021) Barriers and enablers to circular building design in the US: An empirical study. Journal of Construction Engineering and Management, 147(10): 04021117, ISSN 0733-9364

Damnjanovic, I; Duthie, J and Waller, S T (2008) Valuation of strategic network flexibility in development of toll road projects. Construction Management and Economics, 26(9), pp. 979-990. ISSN 1466433X

Damnjanovic, I and Zhang, Z (2008) Risk-based model for valuation of performance-specified pavement maintenance contracts. Journal of Construction Engineering and Management, 134(7), pp. 492-500. ISSN 0733-9364

Das, P; Perera, S; Senaratne, S and Osei-Kyei, R (2023) Paving the way for industry 4.0 maturity of construction enterprises: A state of the art review. Engineering, Construction and Architectural Management, 30(10), pp. 4665-4694. ISSN 0969-9988

Dash, A (2021) Determinants of evs adoption: A study on green behavior of consumers. Smart and Sustainable Built Environment, 10(1), pp. 125-137. ISSN 2046-6099

De Jarnette, V; McCarthy, L M; Bennert, T and Guercio, M C (2013) Use of mechanistic-empirical pavement design principles to assign asphalt pavement pay factor adjustments. Journal of Construction Engineering and Management, 139(11): 4013024, ISSN 0733-9364

De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364

De Oliveira, A L and Prudêncio, L R (2015) Evaluation of the superficial texture of concrete pavers using digital image processing. Journal of Construction Engineering and Management, 141(10): 04015034, ISSN 0733-9364

Dhakal, S; Mrawira, D and Rankin, J (2009) Effect of specifications type on the quality of paving contracts in New Brunswick. Journal of Construction Engineering and Management, 135(9), pp. 801-811. ISSN 0733-9364

Dicks, E P (2023) Analysis of risk identification and relationships for major engineering and construction transportation projects. PhD thesis, University of Colorado at Boulder, USA.

Doan, P and Menyah, K (2013) Impact of irreversibility and uncertainty on the timing of infrastructure projects. Journal of Construction Engineering and Management, 139(3), pp. 331-338. ISSN 0733-9364

Dorée, A and Miller, S (2008) Is technology a new challenge for the field of construction management? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Du, J; Liu, B; Hu, Y and Castro-Lacouture, D (2024) Analyzing Prefabricated Components Supply Chain Cooperation Patterns with Multiparty Dynamics Using Evolutionary Game Theory. Journal of Construction Engineering and Management, 150(12): 04024175, ISSN 0733-9364

Dunston, P S; Gambatese, J A and McManus, J F (2005) Assessing state transportation agency constructability implementation. Journal of Construction Engineering and Management, 131(5), pp. 569-578. ISSN 0733-9364

Dunston, P S; Savage, B M and Mannering, F L (2000) Weekend closure for construction of asphalt overlay on urban highway. Journal of Construction Engineering and Management, 126(4), pp. 313-315. ISSN 0733-9364

Easson, Michael Bernard (2016) The application of a theory of real options (tro) to the decision-making of mega urban transport projects (mutps). PhD thesis, University of Melbourne, Australia.

El Asmar, M; Lotfallah, W; Whited, G and Hanna, A S (2010) Quantitative methods for design-build team selection. Journal of Construction Engineering and Management, 136(8), pp. 904-912. ISSN 0733-9364

El Said, S F (2022) A modeling approach to indexing the cost of highway construction and maintenance projects to a responsive highway user fee using bid items data. PhD thesis, Vanderbilt University, USA.

El-Diraby, T E and O'Connor, J T (2001) Model for evaluating bridge construction plans. Journal of Construction Engineering and Management, 127(5), pp. 399-405. ISSN 0733-9364

El-Rayes, K (2001) Optimum planning of highway construction under A+B bidding method. Journal of Construction Engineering and Management, 127(4), pp. 261-269. ISSN 0733-9364

El-Rayes, K and Moselhi, O (2001) Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, 127(2), pp. 125-131. ISSN 0733-9364

Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model. PhD thesis, Iowa State University, USA.

Espinoza, D; Rojo, J; Cifuentes, A and Morris, J (2020) DNPV: A valuation methodology for infrastructure and capital investments consistent with prospect theory. Construction Management and Economics, 38(3), pp. 259-274. ISSN 01446193

Farnes, K; Hurst, N; Wong, W W and Wilkinson, S (2025) An exploratory study on the benefits of transit orientated development (tod) to rail infrastructure projects. Smart and Sustainable Built Environment, 14(2), pp. 310-325. ISSN 2046-6099

Feng, K (2022) Infrastructure resilience and management under changing tropical cyclone risk. PhD thesis, Princeton University, USA.

Fitzpatrick, C (1992) Constructing lines-of-conduct: Theoretical explanations with empirical evidence. PhD thesis, Colorado State University, USA.

Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771

Ford, D N; Lander, D M and Voyer, J J (2002) A real options approach to valuing strategic flexibility in uncertain construction projects. Construction Management and Economics, 20(4), pp. 343-351. ISSN 01446193

Forsythe, P (2006) Consumer-perceived appearance tolerances in construction quality management. Engineering, Construction and Architectural Management, 13(3), pp. 307-318. ISSN 0969-9988

Galadari, A I (2008) Evaluation of road construction alternatives: A regretful approach. PhD thesis, University of Colorado at Denver, USA.

García-León, R A; Quintero-Quintero, W and Rodriguez-Castilla, M (2020) Thermal analysis of three motorcycle disc brakes. Smart and Sustainable Built Environment, 9(2), pp. 208-226. ISSN 2046-6099

Garvin, M J and Cheah, C Y J (2004) Valuation techniques for infrastructive investment decisions. Construction Management and Economics, 22(4), pp. 373-383. ISSN 01446193

Gharehbaghi, K; McManus, K and Myers, M (2022) Utilization of adaptive methodology to underpin rail transportation systems: Sydney metro's methodical formulation. Journal of Engineering, Design and Technology, 20(5), pp. 1132-1153. ISSN 1726-0531

Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts. PhD thesis, Syracuse University, USA.

Ghulman, B A (2000) Predicting construction cost growth in ODOT's paving projects using information available at the bidding time. PhD thesis, Oklahoma State University, USA.

Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.

Goodrum, P M; Wan, Y and Fenouil, P C (2009) A decision-making system for accelerating roadway construction. Engineering, Construction and Architectural Management, 16(2), pp. 116-135. ISSN 0969-9988

Gowda, R K; Singh, A and Connolly, M (1998) Holistic enhancement of the production analysis of bituminous paving operations. Construction Management and Economics, 16(4), pp. 417-432. ISSN 01446193

Gransberg, D D (2004) Life cycle evaluation criteria for design-build highway pavement projects. PhD thesis, University of Colorado at Boulder, USA.

Gransberg, D D; Karaca, I and Senadheera, S (2004) Calculating roller requirements for chip seal projects. Journal of Construction Engineering and Management, 130(3), pp. 378-384. ISSN 0733-9364

Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Grosse, H (2023) Thrown into a construction dispute: The personal toll of aggressive claims management. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Guo, F; Jahren, C T; Hao, J and Zhang, C (2020) Implementation of CIM-related technologies within transportation projects. International Journal of Construction Management, 20(5), pp. 510-519. ISSN 1562-3599

Guo, F; Jahren, C T and Turkan, Y (2021) Electronic document management systems for the transportation construction industry. International Journal of Construction Education and Research, 17(1), pp. 52-67. ISSN 1557-8771

Guo, X (2008) Pricing and financing roads in transportation networks. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Guyer, R C and Laman, J A (2012) Short-line railroad management system for bridge prioritization. Built Environment Project and Asset Management, 2(1), pp. 25-40. ISSN 2044-124X

Haar, B W (1983) Collusion in the highway construction industry: Economic evidence as an investigative tool. PhD thesis, University of Nebraska - Lincoln, USA.

Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Handojo, T (2001) The framework of a statistical acceptance plan based on the permanent deformation potential of asphalt concrete. PhD thesis, Pennsylvania State University, USA.

Hasheminasab, S and Kashi, E (2021) Finite element analysis of ports pavement under container loading. Journal of Engineering, Design and Technology, 19(2), pp. 497-508. ISSN 1726-0531

Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175

Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364

Hassan, M M; Odeh, I and El-Rayes, K (2011) New approach to compare glare and light characteristics of conventional and balloon lighting systems. Journal of Construction Engineering and Management, 137(1), pp. 39-44. ISSN 0733-9364

He, W (1997) Pavement project optimization and analysis. PhD thesis, Arizona State University, USA.

Hein, M F; Dougherty, M and Hobbs, T (2013) Cleaning methods for pervious concrete pavements. International Journal of Construction Education and Research, 9(2), pp. 102-116. ISSN 1557-8771

Hijazi, A A; Perera, S; Calheiros, R N and Alashwal, A (2021) Rationale for the integration of BIM and blockchain for the construction supply chain data delivery: A systematic literature review and validation through focus group. Journal of Construction Engineering and Management, 147(10): 03121005, ISSN 0733-9364

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.

Holt, G D and Edwards, D J (2014) Machinery transportation management: Case study of "plant-trailer" H&S incidents. Built Environment Project and Asset Management, 4(3), pp. 264-280. ISSN 2044-124X

Hongsheng, T; Changwen, H and Chenye, G (2021) Development of a rotatable similar simulation experimental system for steep coal seam mining. Journal of Engineering, Design and Technology, 19(6), pp. 1373-1386. ISSN 1726-0531

Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.

Hu, Xiaoqiang (2023) New approaches to improving highway design, safety, and visual presentation. PhD thesis, Purdue University, USA.

Huang, K-S (2003) Development-related BOT: A lesson of under-utilized and over-utilized development synergy in Taiwan. DDes thesis, Harvard University, USA.

Huang, R-Y (1994) A graphical-based method for transient evaluation of construction operations. PhD thesis, Purdue University, USA.

Hubbard, B and Hubbard, S (2023) Utilization of uas data by transportation agencies: Building on the experience of construction contractors. International Journal of Construction Management, 23(4), pp. 679-685. ISSN 1562-3599

Huynh, N M; Le-Hoai, L and Do, C D (2025) Assessing and improving labor productivity management in construction: A practical framework and measurement tool. Construction Economics and Building, 25(1), pp. 69-96. ISSN 2204-9029

Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(6), pp. 591-601. ISSN 1466433X

Hyari, K H; El-Mashaleh, M S and Rababeh, S M (2015) Framework for managing the traffic impacts of building construction projects. Journal of Construction in Developing Countries, 20(2), pp. 97-113. ISSN 1823-6499

Ilbeigi, M; Ashuri, B and Shayegh, S (2016) Price adjustment clauses and submitted bid prices for major asphalt line items in highway projects. Journal of Construction Engineering and Management, 142(5): 04015103, ISSN 0733-9364

Inti, S (2016) A decision making approach for selection of sustainable pavements in Texas by integrating life cycle cost analysis (LCCA), life cycle assessment (LCA) of environmental and social impacts. PhD thesis, University of Texas at El Paso, USA.

Islam, Md Mainul M (2009) Optimizing concessionary items' values for procuring privately financed infrastructure projects. PhD thesis, Griffith University, Australia.

Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.

Iyer, K C and Sagheer, M (2010) Hierarchical structuring of PPP risks using interpretative structural modeling. Journal of Construction Engineering and Management, 136(2), pp. 151-159. ISSN 0733-9364

Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X

Jaselskis, E J; Anderson, M R; Jahren, C T; Rodriguez, Y and Njos, S (1995) Radio-frequency identification applications in construction industry. Journal of Construction Engineering and Management, 121(2), pp. 189-196. ISSN 0733-9364

Jen, H (2005) Web-based construction process simulation framework. PhD thesis, Purdue University, USA.

Jeon, J; Zhang, Y; Yang, L; Xu, X; Cai, H and Tran, D (2023) Risk breakdown matrix for risk-based inspection of transportation infrastructure projects. Journal of Construction Engineering and Management, 149(4): 04023007, ISSN 0733-9364

Johnson, L R (1969) A competitive strategy model for highway construction proposals. PhD thesis, Oklahoma State University, USA.

Jones, S H and Armanios, D E (2020) Methodological framework and feasibility study to assess social equity impacts of the built environment. Journal of Construction Engineering and Management, 146(11): 05020016, ISSN 0733-9364

Jordan, E; Gross, M E; Javernick-Will, A N and Garvin, M J (2011) Use and misuse of qualitative comparative analysis. Construction Management and Economics, 29(11), pp. 1159-1173. ISSN 1466433X

Jorge, J (1990) Model of uniform cost policies and procedures for the establishment of construction equipment rates. PhD thesis, University of Florida, USA.

Kaboli, A S and Carmichael, D G (2014) Truck dispatching and minimum emissions earthmoving. Smart and Sustainable Built Environment, 3(2), pp. 170-186. ISSN 2046-6099

Kaboli, Alireza (2014) Cost and emissions analysis of earthmoving operations. PhD thesis, University of New South Wales, Australia.

Kamal Mohammad Attia, M (2013) LEED as a tool for enhancing affordable housing sustainability in Saudi Arabia:The case of Al-Ghala project. Smart and Sustainable Built Environment, 2(3), pp. 224-250. ISSN 2046-6099

Kaminsky, J A (2018) National culture shapes private investment in transportation infrastructure projects around the globe. Journal of Construction Engineering and Management, 144(2): 04017098, ISSN 0733-9364

Kamunda, A; Renukappa, S; Suresh, S and Jallow, H (2021) BIM in the water industry: Addressing challenges to improve the project delivery process. Engineering, Construction and Architectural Management, 28(2), pp. 510-529. ISSN 0969-9988

Karimi, S (2021) A systematic methodology for evaluating and balancing acceptance risks with pay factors for highway construction materials. PhD thesis, University of Maryland, College Park, USA.

Kasai, S; Li, N and Fang, D (2015) A system-of-systems approach to understanding urbanization: state of the art and prospect. Smart and Sustainable Built Environment, 4(2), pp. 154-171. ISSN 2046-6099

Kesuma, P A; Rohman, M A and Arif Prastyanto, C (2022) Analysing the root cause of the damage risk in heavy vehicles to reduce traffic congestion. International Journal of Construction Management, 22(10), pp. 1872-1883. ISSN 1562-3599

Khalid, M A; Hassan, M U; Ullah, F and Ahmed, K (2025) Integrated building information modeling and blockchain system for decentralized progress payments in construction projects. Journal of Engineering, Design and Technology, 23(5), pp. 1770-1796. ISSN 1726-0531

Khan, Mona (2025) System of systems framework for structured risk analysis in complex engineering projects involving alliance. PhD thesis, RMIT University, Australia.

Kim, S (1990) Development of risk assessment decision support system for hazardous materials movement. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kim, Y A; Ryoo, B Y; Kim, Y S and Huh, W C (2013) Major accident factors for effective safety management of highway construction projects. Journal of Construction Engineering and Management, 139(6), pp. 628-640. ISSN 0733-9364

King Lewis, A and Shan, Y (2024) Persistence of women in the construction industry. Journal of Construction Engineering and Management, 150(7): 04024061, ISSN 0733-9364

Koc, K; Durdyev, S; Tleuken, A; Ekmekcioglu, O; Mbachu, J and Karaca, F (2024) Critical success factors for construction industry transition to circular economy: Developing countries' perspectives. Engineering, Construction and Architectural Management, 31(12), pp. 4955-4974. ISSN 0969-9988

Kokkaew, N (2010) Risk flexibility analysis in infrastructure project finance. PhD thesis, Columbia University, USA.

Kone, V. and Mahesh, G. (2026) The iprok ontology: A unified approach to managing construction project information. International Journal of Construction Management, 26(8), pp. 1599-1628. ISSN 1562-3599

Korstanje, M E (2011) Reconnecting with poverty: New challenges of disaster management. International Journal of Disaster Resilience in the Built Environment, 2(2), pp. 165-177. ISSN 1759-5916

Ku, S; Jo, H; Sim, J and Moon, W S (2024) Competitive performance of public–private partnerships: unsolicited proposal projects and tendering rules in South Korea. Construction Management and Economics, 42(8), pp. 714-740. ISSN 01446193

Kumar, S (2023) Optimization of sustainability and resilience for transportation projects. PhD thesis, Colorado State University, USA.

Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.

Lan, R; Adenuga, O and Awolusi, I (2025) Impact of construction project failure on key project stakeholders: Assessing the perspectives of professionals in Lagos metropolis. Construction Economics and Building, 25(3-4), pp. 90-120. ISSN 2204-9029

Le, C; Jeong, H D; Damnjanovic, I and Bukkapatnam, S (2022) Pareto principle in scoping-phase cost estimating: A multiobjective optimization approach for selecting and applying optimal major work items. Journal of Construction Engineering and Management, 148(8): 04022076, ISSN 0733-9364

Le, P T; Chileshe, N; Kirytopoulos, K and Rameezdeen, R (2020) Investigating the significance of risks in BOT transportation projects in Vietnam. Engineering, Construction and Architectural Management, 27(6), pp. 1401-1425. ISSN 0969-9988

Lee, C Y-H (2010) A probabilistic approach to the life-cycle cost assessment of preventive maintenance strategies on flexible pavements. PhD thesis, University of California, Davis, USA.

Lee, E B (2000) Constructability and productivity analysis for long life pavement rehabilitation strategies (LLPRS). PhD thesis, University of California, Berkeley, USA.

Lee, E B; Harvey, J T and Thomas, D (2005) Integrated design/construction/operations analysis for fast-track urban freeway reconstruction. Journal of Construction Engineering and Management, 131(12), pp. 1283-1291. ISSN 0733-9364

Lee, E B; Lee, H and Harvey, J T (2006) Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study. Journal of Construction Engineering and Management, 132(5), pp. 465-472. ISSN 0733-9364

Lee, E B; Lee, H and Ibbs, C W (2007) Productivity aspects of urban freeway rehabilitation with accelerated construction. Journal of Construction Engineering and Management, 133(10), pp. 798-806. ISSN 0733-9364

Lee, E B; Roesler, J; Harvey, J T and Ibbs, C W (2002) Case study of urban concrete pavement reconstruction on Interstate 10. Journal of Construction Engineering and Management, 128(1), pp. 49-56. ISSN 0733-9364

Lee, J S (2005) Developing spatio-temporal models for retrofit and reconstruction strategy under unscheduled events. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Lee, J-R (1997) The object-oriented project system for pavement construction management and visualization. PhD thesis, Ohio State University, USA.

Lee, Jinwoo (2015) Joint optimization of pavement management and reconstruction policies for segment and system problems. PhD thesis, University of California, USA.

Lee, S H (2010) Optimal highway investment decision-making under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.

Lehtinen, J and Aaltonen, K (2024) Community stakeholders' online engagement in infrastructure projects: a theory-testing single-case study. Construction Management and Economics, 42(8), pp. 758-786. ISSN 01446193

Levinson, D M (1998) On whom the toll falls: A model of network financing. PhD thesis, University of California, Berkeley, USA.

Leviäkangas, P; Wigan, M and Haapasalo, H (2013) Financial anatomy of E4 Helsinki-Lahti shadow toll PPP project. Built Environment Project and Asset Management, 3(2), pp. 165-180. ISSN 2044-124X

Li, B; Huang, Y; Lim, H W; Wang, L and Fang, D (2026) How foreman safety leadership influences worker safety behavior: An empirical study from a developmental psychology perspective. Journal of Construction Engineering and Management, 152(2): 04025254, ISSN 0733-9364

Li, B (2008) Domestic private finance project development in China. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Li, K; Griffin, M A and Xia, M (2025) How do workforce adaptability and reskilling initiatives drive innovations: The case of western Australian construction industry. Construction Management and Economics, 43(9), pp. 746-763. ISSN 0144-6193

Li, Liancheng (2025) Towards sustainable recovery of waste plastics with the Australian construction industry: Transition scenarios and environmental impact evaluation. PhD thesis, University of Adelaide, Australia.

Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364

Li, M; Baek, M and Ashuri, B (2021) Forecasting ratio of low bid to owner's estimate for highway construction. Journal of Construction Engineering and Management, 147(1): 04020157, ISSN 0733-9364

Li, P; Tang, Y; Zheng, Z; Wang, Z and Zhuang, Y (2024) Semiautomated railway line information modeling based on asset management data. Journal of Construction Engineering and Management, 150(10): 04024130, ISSN 0733-9364

Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364

Liaros, S (2020) Implementing a new human settlement theory: Strategic planning for a network of regenerative villages. Smart and Sustainable Built Environment, 9(3), pp. 258-271. ISSN 2046-6099

Lin, L-k (1994) Improving the productivity of roadway construction job sites with a portable expert system. PhD thesis, University of Utah, USA.

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X

Liu, T; Bennon, M; Garvin, M J and Wang, S (2017) Sharing the big risk: Assessment framework for revenue risk sharing mechanisms in transportation public-private partnerships. Journal of Construction Engineering and Management, 143(12): 04017086, ISSN 0733-9364

Liu, Y; Habibnezhad, M; Shayesteh, S; Jebelli, H and Lee, S (2021) Paving the way for future EEG studies in construction: Dependent component analysis for automatic ocular artifact removal from brainwave signals. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364

Llale J, C-M O (2023) Potential benefits of close proximity of taxi ranks to retail developments. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Lopez, J; Bhandari, S; Perry, L; Ayer, S K; Hallowell, M R and Jones, M (2025) Analyzing the impact of virtual reality and haptic feedback on the safety skills of construction workers. Journal of Construction Engineering and Management, 151(8): 04025110, ISSN 0733-9364

Love, P E D and Smith, J (2016) Toward error management in construction: Moving beyond a zero vision. Journal of Construction Engineering and Management, 142(11): 04016058, ISSN 0733-9364

Love, P E D; Zhou, J; Matthews, J; Sing, C-P and Carey, B (2015) A systems information model for managing electrical, control, and instrumentation assets. Built Environment Project and Asset Management, 5(3), pp. 278-289. ISSN 2044-124X

Lu, M (2003) Simplified discrete-event simulation approach for construction simulation. Journal of Construction Engineering and Management, 129(5), pp. 537-546. ISSN 0733-9364

Lucas-Healey, K; Ransan-Cooper, H; Temby, H and Russell, A W (2022) Who cares? How care practices uphold the decentralised energy order. Buildings & Cities, 3(1), pp. 448-463. ISSN 2632-6655

Lucke, T and Beecham, S (2011) Field investigation of clogging in a permeable pavement system. Building Research & Information, 39(6), pp. 603-615. ISSN 0961-3218

Luo, S; Liu, Z; Yang, X; Lu, Q and Yin, J (2019) Construction technology of warm and hot mix epoxy asphalt paving for long-span steel bridge. Journal of Construction Engineering and Management, 145(12): 04019074, ISSN 0733-9364

Ma, J; Zhao, Y; Zheng, D; Liao, X and Lu, J (2025) CSADnet: Attention-based semantic segmentation method for spraying scene images of building gables. Journal of Construction Engineering and Management, 151(8): 04025109, ISSN 0733-9364

Maaz, Z N; Adediran, A O; Mohamad Ramly, Z and Darmansah, N F (2026) Artificial intelligence monetization model preference: Supply and demand insights from the built environment sector. Built Environment Project and Asset Management, 16(2), pp. 396-414. ISSN 2044-124X

Mahalingam, A; Yadav, A K and Varaprasad, J (2015) Investigating the role of lean practices in enabling BIM adoption: Evidence from two Indian cases. Journal of Construction Engineering and Management, 141(7): 5015006, ISSN 0733-9364

Makrigeorgis, C N (1991) Development of an optimal durability-based highway cost allocation model. PhD thesis, Texas A&M University, USA.

Mangu, S; Thillai Rajan, A and Deep, A (2021) Comparison of toll and annuity PPPs: A case study of highway projects in India. Built Environment Project and Asset Management, 11(1), pp. 103-120. ISSN 2044-124X

Mansouri, S; Castronovo, F and Akhavian, R (2020) Analysis of the synergistic effect of data analytics and technology trends in the AEC/FM industry. Journal of Construction Engineering and Management, 146(3): 04019113, ISSN 0733-9364

Marciano, E J (2003) Sustainable development and the cement and concrete industries. PhD thesis, Universite de Sherbrooke, Canada.

Marinelli, M (2019) Evaluation of PPP road projects in Greece. Built Environment Project and Asset Management, 9(2), pp. 186-198. ISSN 2044-124X

Marques, N L; Bastian-Pinto, C D L and Brandão, L E T (2021) Crossing the Brownian Bridge: Valuing infrastructure capacity expansion policies as real options. Construction Management and Economics, 39(3), pp. 261-276. ISSN 01446193

Mashhadi, A H; Azad, A R G and Tavakolan, M (2023) Life cycle cost comparison of strengthening a steel bridge using post-installed shear connectors with bridge reconstruction. International Journal of Construction Management, 23(8), pp. 1311-1322. ISSN 1562-3599

Mason, B (2023) Advancing autonomous green stormwater infrastructure. PhD thesis, University of Michigan, USA.

Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.

Mazari, M (2014) Studying the parameters involved with modulus-based construction quality control for compaction of unbound pavement layers. PhD thesis, University of Texas at El Paso, USA.

McCabe, B; AbouRizk, S and Gavin, J (2002) Time of sampling strategies for asphalt pavement quality assurance. Journal of Construction Engineering and Management, 128(1), pp. 85-89. ISSN 0733-9364

Miller, L; Mannering, F and Abraham, D M (2009) Effectiveness of speed control measures on nighttime construction and maintenance projects. Journal of Construction Engineering and Management, 135(7), pp. 614-619. ISSN 0733-9364

Miller, S and Dorée, A (2008) Improving logistics in the asphalt paving process: What can we learn from the planner's logic? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Min, Y and Lee, H W (2024) Adoption inequalities and causal relationship between residential electric vehicle chargers and heat pumps. Journal of Construction Engineering and Management, 150(5): 04024025, ISSN 0733-9364

Minchin, R E and Thomas, H R (2003) Validation of vibration-based onboard asphalt density measuring system. Journal of Construction Engineering and Management, 129(1), pp. 1-7. ISSN 0733-9364

Mirzadeh, I (2014) More roads for the money. PhD thesis, KTH Royal Institute of Technology, Sweden.

Mirzaei, Z (2015) An investigation of methodologies to determine the most sustainable bridge work programs. DSc thesis, ETH Zürich, Switzerland.

Mitropoulos, P and Namboodiri, M (2011) New method for measuring the safety risk of construction activities: Task demand assessment. Journal of Construction Engineering and Management, 137(1), pp. 30-38. ISSN 0733-9364

Mitropoulos, P and Namboodiri, M (2011) The task demands assessment methodology. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 9-17. ISSN 17514312

Mohamad, M and Tran, D Q (2021) Risk-based prioritization approach to construction inspections for transportation projects. Journal of Construction Engineering and Management, 147(1): 04020150, ISSN 0733-9364

Mohamed, M; Abdelaty, A; Khresat, G and Abu El Rub, M (2026) Mapping the patterns of cost and time overruns in the U.S. Highway construction projects: A regional risk analysis. International Journal of Construction Management, 26(3), pp. 470-481. ISSN 1562-3599

Mohamed, M (2022) A risk-based model for construction inspection in highways. PhD thesis, University of Kansas, USA.

Mohamed, M and Tran, D Q (2021) Risk-based inspection model for hot mix asphalt pavement construction projects. Journal of Construction Engineering and Management, 147(6): 78622053, ISSN 0733-9364

Mohamed, S Y (2020) Stochastic performance and maintenance optimization models for pavement infrastructure management. PhD thesis, Purdue University, USA.

Mohammadinia, M R (1997) Development of rational and defensible pay schedules for a performance specification using performance prediction and user and agency costs. PhD thesis, Polytechnic University, USA.

Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364

Morcous, G S L (2000) Case -based reasoning for modeling bridge deterioration. PhD thesis, Concordia University, Canada.

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.

Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364

Mostafavi, A and Inman, A (2016) Exploratory analysis of the pathway towards operationalizing resilience in transportation infrastructure management. Built Environment Project and Asset Management, 6(1), pp. 106-118. ISSN 2044-124X

Mostafavi, A; Valentin, V; Abraham, D M and Louis, J (2012) Assessment of the productivity of nighttime asphalt paving operations. Journal of Construction Engineering and Management, 138(12), pp. 1421-1432. ISSN 0733-9364

Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.

Moussa, M (2022) Truck tolling for bridges in USA: A new approach for determining a fair toll policy. PhD thesis, New York University Tandon School of Engineering, USA.

Nakanishi, H; Black, J and Matsuo, K (2014) Disaster resilience in transportation: Japan earthquake and tsunami 2011. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 341-361. ISSN 1759-5916

Nam, C H and Tatum, C B (1992) Government-industry cooperation: Fast-track concrete innovation. Journal of Construction Engineering and Management, 118(3), pp. 454-471. ISSN 0733-9364

Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364

Nayyer, M I; Aravindan, M R and Annamalai, T R (2024) Impact of transparency law on the post-award development phase of toll and annuity PPPs. Built Environment Project and Asset Management, 14(1), pp. 22-37. ISSN 2044-124X

Ng, F P and Björnsson, H C (2004) Using real option and decision analysis to evaluate investments in the architecture, construction and engineering industry. Construction Management and Economics, 22(5), pp. 471-482. ISSN 01446193

Ng, M F; Tummala, V M R and Yam, R C M (2003) A risk-based maintenance management model for toll road/tunnel operations. Construction Management and Economics, 21(5), pp. 495-510. ISSN 01446193

Nguyen, A; Mollik, A and Chih, Y Y (2018) Managing critical risks affecting the financial viability of public-private partnership projects: Case study of toll road projects in Vietnam. Journal of Construction Engineering and Management, 144(12): 05018014, ISSN 0733-9364

Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.

Nguyen, L D; Nguyen, T K N; Tran, D Q and Villiers, C (2014) Productivity in daytime and nighttime construction of urban sewer systems. Journal of Construction Engineering and Management, 140(7): 04014021, ISSN 0733-9364

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public–private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public-private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.

Nunes, M C M (1997) Enabling the use of alternative materials in road construction. PhD thesis, University of Nottingham, UK.

O'Connor, J T and El-Diraby, T E (2000) Urban freeway bridge reconstruction planning: Case of mockingbird bridge. Journal of Construction Engineering and Management, 126(1), pp. 61-67. ISSN 0733-9364

Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.

Odeh, I; El-Rayes, K and Liu, L (2009) Field experiments to evaluate and control light tower glare in nighttime work zones. Journal of Construction Engineering and Management, 135(9), pp. 911-919. ISSN 0733-9364

Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.

Ogunmakinde, O E (2025) Achieving zero waste: Circular economy strategies in Australian higher education. Construction Economics and Building, 25(2), pp. 1-23. ISSN 2204-9029

Ogunrinde, O (2020) Enhancing quality management in highway construction using emerging methods. PhD thesis, University of Alabama, USA.

Ogunrinde, O; Amirkhanian, A; Corley, M and Nnaji, C (2020) Effect of nighttime construction on quality of asphalt paving. Journal of Construction Engineering and Management, 146(9): 04020111, ISSN 0733-9364

Oke, A E; Aliu, J; Fadamiro, P; Leo-Olagbaye, F; Jamir Singh, P S and Samsurijan, M S (2023) Evaluating the drivers for the implementation of automation techniques in the Nigerian construction sector. Built Environment Project and Asset Management, 13(6), pp. 913-928. ISSN 2044-124X

Okpala, I U (2022) Robotics and automation in construction: Developing foundational insight and tools to support safe implementation. PhD thesis, University of Alabama, USA.

Oliveros-Romero, J and Aibinu, A A (2023) Ex-post impact evaluation of PPP projects from multiple stakeholder perspectives: A toll road case. Built Environment Project and Asset Management, 13(4), pp. 574-589. ISSN 2044-124X

Owojori, O M; Okoro, C and Chileshe, N (2024) Actualising social sustainability through adaptive reuse innovations within the context of sustainable development. International Journal of Construction Management, 24(4), pp. 411-421. ISSN 1562-3599

Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study. PhD thesis, University of Maryland, College Park, USA.

Oyediran, A; Oke, A E; Ikuabe, M; Aliu, J; Adeosun, F E and Aigbavboa, C O (2025) Exploring application areas of cyber-physical systems in the construction industry: A case of Nigeria. International Journal of Construction Management, 25(15), pp. 1811-1823. ISSN 1562-3599

Ozbek, M E; de la Garza, J M and Triantis, K (2012) Efficiency measurement of the maintenance of paved lanes using data envelopment analysis. Construction Management and Economics, 30(11), pp. 995-1009. ISSN 1466433X

Pakalapati, K; Khalafalla, M and Rueda-Benavides, J (2022) Using moving-window cross-validation algorithm to optimize bid-based cost estimating data usage. International Journal of Construction Management, 22(15), pp. 2855-2863. ISSN 1562-3599

Pantelias, A (2009) A methodological framework for probabilistic evaluation of financial viability of transportation infrastructure under public private partnerships. PhD thesis, University of Texas at Austin, USA.

Papadonikolaki, E and Wamelink, H (2017) Inter- and intra-organizational conditions for supply chain integration with BIM. Building Research & Information, 45(6), pp. 649-664. ISSN 0961-3218

Papajohn, D (2019) Contract administration functions and tools for design-build and construction manager/general contractor project delivery in U.S. Highway construction. PhD thesis, Arizona State University, USA.

Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531

Pathak, C (2021) Electric vehicle infrastructure decision support system. PhD thesis, University of Washington, USA.

Pau, S H; Chau, K W and Wong, W G (1993) Prospects for no-dig technology in Hong Kong construction industry. Journal of Construction Engineering and Management, 119(3), pp. 550-559. ISSN 0733-9364

Pellegrino, R; Carbonara, N and Costantino, N (2019) Public guarantees for mitigating interest rate risk in PPP projects. Built Environment Project and Asset Management, 9(2), pp. 248-261. ISSN 2044-124X

Perkins, J A (1992) Institutionalizing transportation infrastructure investments and economic development: The role of state departments of transportation in multi-state economic development activities. PhD thesis, Georgia Institute of Technology, USA.

Pheng, L S and Chuan, C J (2001) Just-in-time management of precast concrete components. Journal of Construction Engineering and Management, 127(6), pp. 494-501. ISSN 0733-9364

Pinero, J C (2003) A framework for monitoring performance-based road maintenance. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.

Pramudya, A A and Wibowo, A (2022) Ranking risks of BOT toll road investment projects in Indonesia using fuzzy interpretive structural modelling. Construction Economics and Building, 22(4), pp. 59-80. ISSN 2204-9029

Praticò, F G (2007) Quality and timeliness in highway construction contracts: A new acceptance model based on both mechanical and surface performance of flexible pavements. Construction Management and Economics, 25(3), pp. 305-313. ISSN 1466433X

Praticò, F G; Casciano, A and Tramontana, D (2011) Pavement life-cycle cost and asphalt binder quality: Theoretical and experimental investigation. Journal of Construction Engineering and Management, 137(2), pp. 99-107. ISSN 0733-9364

Puri, V and Martinez, J C (2013) Modeling of simultaneously continuous and stochastic construction activities for simulation. Journal of Construction Engineering and Management, 139(8), pp. 1037-1045. ISSN 0733-9364

Qi, T.; Liu, D.; Guo, Y.; Zhou, X.; Zhao, X.; Huang, X.; Wang, Y.; Jiang, Y.; Lu, L. and Wang, Z. (2025) Toward efficient and agent-scalable indoor pathfinding: Intelligent navigation-ability-driven indoor map generation using building information model. Architectural Engineering and Design Management, 21(5), pp. 1000-1021. ISSN 1745-2007

Raihan, M A (2018) Improved methods for network screening and countermeasure selection for highway improvements. PhD thesis, Florida International University, USA.

Ramirez Flores, R A (2015) A stochastic approach for pavement condition projections and budget needs for the MTC pavement management system. PhD thesis, University of Texas at El Paso, USA.

Rautela, P; Chandra Joshi, G and Bhaisora, B (2011) Seismic vulnerability of the health infrastructure in the Himalayan township of Mussoorie, Uttarakhand, India. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 200-209. ISSN 1759-5916

Reeves, K (2003) The evolution of the Japanese construction business system and its major players. PhD thesis, University of London, University College London, UK.

Reigle, J A (2000) Development of an integrated project-level pavement management model using risk analysis. PhD thesis, West Virginia University, USA.

Rezaei Nasab, S S; Tayefi Nasrabadi, A; Asadi, S and Haj Seiyed Taghia, S A (2022) Investigating the probability of designing net-zero energy buildings with consideration of electric vehicles and renewable energy. Engineering, Construction and Architectural Management, 29(10), pp. 4061-4087. ISSN 0969-9988

Rezgui, Y and Zarli, A (2006) Paving the way to the vision of digital construction: A strategic roadmap. Journal of Construction Engineering and Management, 132(7), pp. 767-776. ISSN 0733-9364

Rilett, L R (1998) Effect of variability on end product specifications. Journal of Construction Engineering and Management, 124(2), pp. 139-145. ISSN 0733-9364

Rohman, M A (2022) Assessment of the government's role performance in public-private partnership (PPP) toll road projects in Indonesia. Journal of Financial Management of Property and Construction, 27(2), pp. 239-258. ISSN 1366-4387

Rohman, M A; Doloi, H and Heywood, C A (2017) Success criteria of toll road projects from a community societal perspective. Built Environment Project and Asset Management, 7(1), pp. 32-44. ISSN 2044-124X

Rohman, M A and Wiguna, I P A (2021) Evaluation of road design performance in delivering community project social benefits in Indonesian PPP. International Journal of Construction Management, 21(11), pp. 1130-1142. ISSN 1562-3599

Rohman, Mohammad Arif (2017) Stakeholders' perspective on achieving project social benefit from Indonesian toll roads. PhD thesis, University of Melbourne, Australia.

Ronny, R and Ptak, J S (2012) Localised solutions developed to suit South African challenges. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 5-11. ISSN 17514312

Rueda-Benavides, J; Khalafalla, M; Miller, M and Gransberg, D (2023) Cross-asset prioritization model for transportation projects using multi-attribute utility theory: A case study. International Journal of Construction Management, 23(16), pp. 2746-2755. ISSN 1562-3599

Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques. PhD thesis, Iowa State University, USA.

Ruiz, A; Vinke-De Kruijf, J; Santos, J; Keijzer, E; Volker, L and Dorée, A (2024) The slow implementation of sustainable innovations in the asphalt paving sector: the role of actors and their interactions. Construction Management and Economics, 42(10), pp. 902-925. ISSN 01446193

Ruiz, A; Vinke-de Kruijf, J; Santos, J; Volker, L and Dorée, A (2023) Sustainable innovation processes in the asphalt paving sector: A system innovation approach. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Ruiz, A; Vinke-De Kruijf, J; Santos, J; Volker, L and Dorée, A (2025) Sustainability transitions in infrastructure: Understanding causal dynamics in the Dutch asphalt paving sector. Construction Management and Economics, 43(10), pp. 794-822. ISSN 0144-6193

Ruiz, Phelipe Viana (2023) Game-based learning in the teaching of civil construction techniques. PhD thesis, Universidade Estadual de Campinas, Brazil.

Saad, A M; Dulaimi, M; Zulu, S L and Gorse, C (2025) Are the characteristics of public clients influencing their uptake of the modern methods of construction? A thematic analysis. Smart and Sustainable Built Environment, 14(1), pp. 190-209. ISSN 2046-6099

Safour, A and Egbu, C (2010) City centre road user charging; real schemes and field-based experimental studies: State of art. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Sankaran, B and O'Brien, W J (2018) Bayesian second-order factor model for maturity assessment of CIM technologies and practices at highway agencies. Journal of Construction Engineering and Management, 144(4): 04018015, ISSN 0733-9364

Santero, N J (2009) Pavements and the environment: A life-cycle assessment approach. PhD thesis, University of California, Berkeley, USA.

Schexnayder, C and Ohrn, L G (1997) Highway specifications: quality versus pay. Journal of Construction Engineering and Management, 123(4), pp. 437-443. ISSN 0733-9364

Schexnayder, C J; Weber, S L and David, S A (2004) Transportation agency use of owner-controlled insurance programs. Journal of Construction Engineering and Management, 130(4), pp. 517-524. ISSN 0733-9364

Sciulli, G; Rizzo, P; Kurlander, J and Brozik, B (2025) A comparative analysis of three methodological frameworks for bridge asset management. Journal of Construction Engineering and Management, 151(5): 04025029, ISSN 0733-9364

Shafabakhsh, G; Kashi, E and Tahani, M (2018) Analysis of runway pavement response under aircraft moving load by FEM. Journal of Engineering, Design and Technology, 16(2), pp. 233-243. ISSN 1726-0531

Shafabakhsh, G A; Kashi, E and Akbari, A (2016) A comparison effect of aircraft main gear configuration on runway damages by led and fe method. Journal of Engineering, Design and Technology, 14(2), pp. 362-372.

Shan, L; Garvin, M J and Kumar, R (2010) Collar options to manage revenue risks in real toll public-private partnership transportation projects. Construction Management and Economics, 28(10), pp. 1057-1069. ISSN 1466433X

Shankar, R and Tan, W (2024) Bid variability in public-private partnerships: Lessons from asset monetization through the toll-operate-transfer model in India. Journal of Construction Engineering and Management, 150(12): 05024015, ISSN 0733-9364

Sharafi, A; Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(2), pp. 87-103. ISSN 01446193

Sharafi, A; Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of financial conflicts in the operation phase of public-private partnership contracts. Journal of Construction Engineering and Management, 147(6): 78622011, ISSN 0733-9364

Sharma, H; McIntyre, C; Gao, Z and Nguyen, T H (2009) Developing a traffic closure integrated linear schedule for highway rehabilitation projects. Journal of Construction Engineering and Management, 135(3), pp. 146-155. ISSN 0733-9364

Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.

Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, K and Shrestha, P P (2022) Framework to implement performance-based contracting for chip-seal road maintenance. Journal of Construction Engineering and Management, 148(1): 04021183, ISSN 0733-9364

Shrestha, S; Shan, Y and Goodrum, P M (2024) Identification of best practices in project bundling for state dots using semistructured interviews. Journal of Construction Engineering and Management, 150(7): 04024056, ISSN 0733-9364

Silwal, A.; Rouhanizadeh, B.; Safapour, E. and Ricks, M. (2026) Sustainable transportation infrastructure: Comparative analysis and a comprehensive decision-support tool. Built Environment Project and Asset Management, 16(3), pp. 616-636. ISSN 2044-124X

Siriwardhana, S; Moehler, R and Fang, Y (2025) Navigating epistemological shifts: Management of skills development in the construction 4.0 era. International Journal of Construction Management, 25(15), pp. 1869-1878. ISSN 1562-3599

Smith, D J (2003) Ecological effects of roads: Theory, analysis, management, and planning considerations. PhD thesis, University of Florida, USA.

Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364

Songer, A D; Diekmann, J and Pecsok, R S (1997) Risk analysis for revenue dependent infrastructure projects. Construction Management and Economics, 15(4), pp. 377-382. ISSN 01446193

Souza, Fernando da Silva (2021) Reinsertion of construction and demolition waste into the production chain of civil construction in Rio Branco, Acre. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

Spillane, J P; Flood, M; Lukumon, O O; von Meding, J K and Konanahalli, A (2013) Urban high-density construction sites and their surrounding community: Issues encountered and strategies adopted by contractors. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Sreram, P K and Thomas, A (2026) A discrete event simulation-based value stream map implementation scheme for small and medium enterprises (SMEs). International Journal of Construction Management, 26(3), pp. 428-444. ISSN 1562-3599

Srivastava, A; Srivastava, D K and Misra, A K (2019) Spatial variability modeling and reliability analysis of flexible pavement through mechanistic–empirical model. Journal of Engineering, Design and Technology, 17(6), pp. 1129-1145. ISSN 1726-0531

Stamatiadis, N; Goodrum, P; Shocklee, E and Wang, C (2014) Quantitative analysis of state transportation agency's experience with constructability reviews. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364

Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses. PhD thesis, University of Alabama, USA.

Strengers, Y; Gram-Hanssen, K; Dahlgren, K and Aagaard, L K (2022) Energy, emerging technologies and gender in homes. Buildings & Cities, 3(1), pp. 842-853. ISSN 2632-6655

Su, Y Y; Hashash, Y M A and Liu, L Y (2006) Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management, 132(12), pp. 1234-1241. ISSN 0733-9364

Subin, Z M; Lombardi, J; Muralidharan, R; Korn, J; Malik, J; Pullen, T; Wei, M and Hong, T (2024) US urban land-use reform: A strategy for energy sufficiency. Buildings & Cities, 5(1), pp. 400-417. ISSN 2632-6655

Subprasom, K (2004) Multi-party and multi-objective network design analysis for the build-operate-transfer scheme. PhD thesis, Utah State University, USA.

Subprasom, K and Chen, A (2007) Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme. Journal of Construction Engineering and Management, 133(1), pp. 64-71. ISSN 0733-9364

Sun, C; MacKley, A and Edara, P (2014) Programmatic examination of missouri incentive/disincentive contracts for mitigating work zone traffic impacts. Journal of Construction Engineering and Management, 140(1): 05013004, ISSN 0733-9364

Susanti, B; Kadarsa, E; Foralisa, M and Juliantina, I (2023) Non-toll revenue potential to increase funding sources for toll road maintenance. Construction Economics and Building, 23(3-4), pp. 170-185. ISSN 2204-9029

Swei, O (2020) Forecasting infidelity: Why current methods for predicting costs miss the mark. Journal of Construction Engineering and Management, 146(2): 04019100, ISSN 0733-9364

Swei, O; Gregory, J and Kirchain, R (2017) Probabilistic approach for long-run price projections: Case study of concrete and asphalt. Journal of Construction Engineering and Management, 143(1): 05016018, ISSN 0733-9364

Taheri, Ali (2024) The framework of an infrastructure performance model based on the concepts of civil integrated management (CIM). PhD thesis, Florida State University, USA.

Tang, G; Zhao, Z; Cao, L; Qi, Y; Yu, X and Liu, W (2023) A simulation optimization approach to optimize dredger fleet schedule plan for dredging works in existing ports. Journal of Construction Engineering and Management, 149(2): 4022165, ISSN 0733-9364

Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364

Thach, H. P.; Nguyen, L. D. and Nguyen, V. T. (2026) Integrating coastal segmentation on predictive modeling for data-driven bridge asset management. International Journal of Construction Management, 26(10), pp. 2228-2244. ISSN 1562-3599

Thakur, A; Krishnan K, J and Ansari, A (2025) Powering the transition: Examining factors influencing the intention to adopt electric vehicles. Smart and Sustainable Built Environment, 14(2), pp. 471-488. ISSN 2046-6099

Thawanapong, C and Tachakitkachorn, T (2026) The sequence of activities for digital twin implementation for building operations by industrial practitioners: A multiple case study analysis in Thailand. International Journal of Construction Management, 26(5), pp. 825-839. ISSN 1562-3599

Thorpe-Jones, E; Dainty, A and Fellows, R (2010) Enacting diversity and equality as part of CSR policy: An agenda for change. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Timothy, A G; Bonney, S O and Thwala, W D (2026) Principal component analysis of smart city delivery for sustainable construction in Ghana. Construction Economics and Building, 26(1), ISSN 2204-9029

Tiong, R L K (1990) BOT projects: Risks and securities. Construction Management and Economics, 8(3), pp. 315-328. ISSN 01446193

Tiong, R L K (1995) Competitive advantage of equity in BOT tender. Journal of Construction Engineering and Management, 121(3), pp. 282-289. ISSN 0733-9364

Tiong, R L K (1995) Impact of financial package versus technical solution in a BOT tender. Journal of Construction Engineering and Management, 121(3), pp. 304-311. ISSN 0733-9364

Tiong, R L K and Alum, J (1997) Final negotiation in competitive BOT tender. Journal of Construction Engineering and Management, 123(1), pp. 6-10. ISSN 0733-9364

Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(2), pp. 83-94. ISSN 0969-9988

Toriola-Coker, L O; Alaka, H; Agbali, M; Bello, W A; Pathirage, C and Oyedele, L (2022) Marginalization of end-user stakeholder's in public private partnership road projects in Nigeria. International Journal of Construction Management, 22(11), pp. 2098-2107. ISSN 1562-3599

Towles, C (2017) Maximizing economic returns for large, publicly funded road infrastructure investments through improved economic, engineering and construction information management. DEng thesis, Ecole de Technologie Superieure, Canada.

Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Tran, D Q; Harper, C M; Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(9), pp. 2163-2178. ISSN 0969-9988

Tran, D Q; Jeon, Y; Aboah, A; Bak, J; Park, M and Park, S (2025) Leveraging semisupervised learning for domain adaptation: Enhancing safety at construction sites through long-tailed object detection. Journal of Construction Engineering and Management, 151(1): 04024190, ISSN 0733-9364

Tran, D Q and Molenaar, K R (2014) Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management, 21(6), pp. 631-647. ISSN 0969-9988

Van Tam, N (2025) Impact of self-efficacy on construction labor productivity: The mediating role of work motivation. Engineering, Construction and Architectural Management, 32(5), pp. 3407-3431. ISSN 0969-9988

Van Tam, N (2025) Mitigating digital transformation risks for circular construction in emerging economies: An empirical investigation in Vietnam. International Journal of Construction Management, 25(10), pp. 1130-1140. ISSN 1562-3599

Vazquez, F and Allen, S (2004) Private sector participation in the delivery of highway infrastructure in central America and Mexico. Construction Management and Economics, 22(7), pp. 745-754. ISSN 01446193

Victar, H C and Waidyasekara, K G A S (2026) Circular economy strategies for minimising construction waste in Sri Lanka: Focus on the preconstruction stage. Construction Innovation, 26(3), pp. 814-842. ISSN 1471-4175

Vijayenthiran, V.; Perera, B. A. K. S. and Kavirathna, A. S. (2026) Convergence of 3D printing with circular economy to improve the construction sustainability. Smart and Sustainable Built Environment, 15(3), pp. 1026-1046. ISSN 2046-6099

Viljoen, P S (1981) Incentive management techniques for pavement rehabilitation construction. PhD thesis, University of California, Berkeley, USA.

Vinodh, S and Arun, M (2010) Application of creative design concept to braking system synchronization in two wheeler bikes. Journal of Engineering, Design and Technology, 8(3), pp. 354-368. ISSN 1726-0531

Vinodh, S and Sharath, K T (2016) A case study on applying creative design concepts to brake rotor design. Journal of Engineering, Design and Technology, 14(1), pp. 2-16.

Walters, R; Jaselskis, E; Zhang, J; Mueller, K and Kaewmoracharoen, M (2008) Using scanning lasers to determine the thickness of concrete pavement. Journal of Construction Engineering and Management, 134(8), pp. 583-591. ISSN 0733-9364

Wang, B; Cui, Q and Zhang, S (2021) Noncompete provision design for transportation PPP projects. Journal of Construction Engineering and Management, 147(2): 04020159, ISSN 0733-9364

Wang, K (2017) Real options models for better investment decisions in road infrastructure under demand uncertainty. PhD thesis, University of California, Irvine, USA.

Watts, G (2019) Measuring and managing the social value created by a diverse construction business. PhD thesis, Loughborough University, UK.

Watts, G; McDermott, P and Kolo, S (2023) Framing the barriers to construction industry transformation. Built Environment Project and Asset Management, 13(1), pp. 185-199. ISSN 2044-124X

Weerapperuma, U S; Rathnasinghe, A P; Jayasena, H S; Wijewickrama, C S and Thurairajah, N (2025) A knowledge framework for blockchain-enabled smart contract adoption in the construction industry. Engineering, Construction and Architectural Management, 32(1), pp. 374-408. ISSN 0969-9988

White, T G (1975) Ergonomic analysis of human factors affecting optimum performance of mobile crane drivers. PhD thesis, University of Surrey, UK.

Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193

Wibowo, A and Alfen, H W (2013) Fine-tuning the value and cost of capital of risky PPP infrastructure projects. Engineering, Construction and Architectural Management, 20(4), pp. 406-419. ISSN 0969-9988

Wibowo, A and Kochendörfer, B (2005) Financial risk analysis of project finance in Indonesian toll roads. Journal of Construction Engineering and Management, 131(9), pp. 963-972. ISSN 0733-9364

Wibowo, A; Permana, A; Kochendörfer, B; Kiong, R T L; Jacob, D and Neunzehn, D (2012) Modeling contingent liabilities arising from government guarantees in Indonesian BOT/PPP toll roads. Journal of Construction Engineering and Management, 138(12), pp. 1403-1410. ISSN 0733-9364

Wilde, W J (1998) Life cycle cost analysis of portland cement concrete pavements. PhD thesis, University of Texas at Austin, USA.

Williams, T P (1991) Hypertext data base applications in construction. Journal of Construction Engineering and Management, 117(3), pp. 460-467. ISSN 0733-9364

Winarno, S; Griffith, A and Stephenson, P (2008) Earthquake risk reduction to non-engineered buildings: A study of practice in Indonesia. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Winata, L E and Gultom, Y M L (2024) The effects of governance on performance: The case of public-private partnership (PPP) toll roads in Indonesia. International Journal of Construction Management, 24(13), pp. 1398-1406. ISSN 1562-3599

Withrow, J; Dadi, G; Nassereddine, H and Sturgill, R (2024) Asphalt material e-ticketing workflow: Qualitative and quantitative analysis. Journal of Construction Engineering and Management, 150(3): 04023164, ISSN 0733-9364

Withrow, Josh (2024) Impact of augmented documentation workflows on transportation agency asphalt paving operations: A qualitative and quantitative study. PhD thesis, University of Kentucky, USA.

Woldesenbet, A K (2014) Highway infrastructure data and information integration & assessment framework: A data-driven decision-making approach. PhD thesis, Iowa State University, USA.

Wong, P S P and Lam, K Y (2012) Facing turbulence: Driving force for construction organizations to regain unlearning and learning traction. Journal of Construction Engineering and Management, 138(10), pp. 1202-1211. ISSN 0733-9364

Wood, X; Ghimire, P; Kim, S; Barutha, P and Jeong, H D (2024) Framework for evaluating the success of integrated project delivery in the industrial construction sector: A mixed methods approach & machine learning application. Construction Economics and Building, 24(1-2), pp. 94-118. ISSN 2204-9029

Wu, C; Wu, P; Jiang, R; Wang, J; Wang, X and Wan, M (2022) Evaluating the economic and social benefits of multiutility tunnels with an agent-based simulation approach. Engineering, Construction and Architectural Management, 29(1), pp. 1-25. ISSN 0969-9988

Wuni, I Y (2023) Drivers of circular economy adoption in the construction industry: A systematic review and conceptual model. Building Research & Information, 51(7), pp. 816-833. ISSN 0961-3218

Xiao, F (2007) Game-theoretic models for competitive pricing and network design problems. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xiong, W and Zhang, X (2014) Concession renegotiation models for projects developed through public-private partnerships. Journal of Construction Engineering and Management, 140(5): 04014008, ISSN 0733-9364

Xu, S; Wang, J; Wang, X; Shou, W and Ngo, T (2025) Defect modelling and correlation mapping for bridge inspection. Engineering, Construction and Architectural Management, 32(6), pp. 4174-4196. ISSN 0969-9988

Xu, X (2024) A multi-agent reinforcement learning task allocation framework for navigation sequences of construction robots. PhD thesis, New York University Tandon School of Engineering, USA.

Yamaura, J T (2018) The value of cloud computing technology in public transportation construction. PhD thesis, University of Washington, USA.

Yang, N (2010) Optimization of highway work zone decisions considering short-term and long-term impacts. PhD thesis, University of Maryland, College Park, USA.

Yang, W; Firouzi, A and Li, C Q (2023) Risk transfer in project finance loans for toll road using credit default swaps. Journal of Financial Management of Property and Construction, 28(1), pp. 1-21. ISSN 1366-4387

Yu, B (2013) Environmental implications of pavements: A life cycle view. PhD thesis, University of South Florida, USA.

Yu, Y (2021) Road network maintenance and repair considering day-to-day traffic dynamics and transient congestion. PhD thesis, Imperial College London, UK.

Zapata Quimbayo, C A and Mejía Vega, C A (2023) Credit risk in infrastructure PPP projects under the real options approach. Construction Management and Economics, 41(4), pp. 293-306. ISSN 01446193

Zapata Quimbayo, C A; Mejía Vega, C A and Marques, N L (2019) Minimum revenue guarantees valuation in PPP projects under a mean reverting process. Construction Management and Economics, 37(3), pp. 121-138. ISSN 01446193

Zech, W C (2004) Enhancing work zone safety. PhD thesis, State University of New York at Buffalo, USA.

Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X

Zhang, K.; Shaheen, Q. H. and Cui, Q. (2026) Understanding structured project finance for US transportation public-private partnerships: What maximizes financing capacity? Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Zhang, Z.; Wang, Y.; Liu, J.; Wang, Y.; Liu, C. and Geng, X. (2026) Transport risk assessment for China's prefabricated construction supply chain: Integrating game theory and fuzzy Bayesian network. Engineering, Construction and Architectural Management, pp. 1-24. ISSN 0969-9988

Zhang, C (2017) Human-centered automation for resilience in acquiring construction field information. PhD thesis, Arizona State University, USA.

Zhang, H and Yu, L (2020) Dynamic transportation planning for prefabricated component supply chain. Engineering, Construction and Architectural Management, 27(9), pp. 2553-2576. ISSN 0969-9988

Zhang, S (2017) Pavement surface distress detection, assessment, and modeling using geospatial techniques. PhD thesis, University of New Mexico, USA.

Zhang, X (2005) Paving the way for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 71-80. ISSN 0733-9364

Zhang, X; Otto, F and Oeser, M (2021) Modeling pavement surface deflections under accelerated pavement testing using the PCA method. Journal of Construction Engineering and Management, 147(12): 04021169, ISSN 0733-9364

Zhang, X Q and Kumaraswamy, M M (2001) Procurement protocols for public-private partnered projects. Journal of Construction Engineering and Management, 127(5), pp. 351-358. ISSN 0733-9364

Zhao, Y (2023) Sustainability, acceptance risk analysis and machine learning in assessing mechanical properties and the impact of highway materials in transportation infrastructure. PhD thesis, University of Maryland, College Park, USA.

Zhou, B (2012) Optimal decision-making of interdependent transportation investment alternatives under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.

Zhu, Y; Ahmad, I and Wang, L (2009) Estimating work zone road user cost for alternative contracting methods in highway construction projects. Journal of Construction Engineering and Management, 135(7), pp. 601-608. ISSN 0733-9364

Zuluaga, C M; Albert, A and Arroyo, P (2018) Protecting bridge maintenance workers from falls: Evaluation and selection of compatible fall protection supplementary devices. Journal of Construction Engineering and Management, 144(8): 04018073, ISSN 0733-9364

Zuluaga, C M; Albert, A and Winkel, M A (2020) Improving safety, efficiency, and productivity: Evaluation of fall protection systems for bridge work using wearable technology and utility analysis. Journal of Construction Engineering and Management, 146(2): 04019107, ISSN 0733-9364

Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology. PhD thesis, North Carolina State University, USA.

de Marco, A; Mangano, G and Zou, X Y (2012) Factors influencing the equity share of build-operate-transfer projects. Built Environment Project and Asset Management, 2(1), pp. 70-85. ISSN 2044-124X

van den Boomen, M; Spaan, M T J; Schoenmaker, R and Wolfert, A R M (2019) Untangling decision tree and real options analyses: A public infrastructure case study dealing with political decisions, structural integrity and price uncertainty. Construction Management and Economics, 37(1), pp. 24-43. ISSN 01446193

This list was generated on Sat Aug 22 02:26:41 2026 UTC.