Items with Subject: time analysis
Aftab, U; Hassan, M U; Ullah, F; Nasir, A R and Thaheem, M J (2026) BIM-based search and selection of construction material suppliers: A dedicated framework and prototype. Construction Innovation, 26(3), pp. 892-915. ISSN 1471-4175
Agri, M. E.; Le, A. and Phung, Q. (2026) AI integration in architectural design and management: Professionals' perspectives. Architectural Engineering and Design Management, 22(1), pp. 67-82. ISSN 1745-2007
Aiyetan, O A (2019) Influence of the management styles and quality of management on project delivery. Journal of Construction Business and Management, 3(1), pp. 38-44. ISSN 2521-0165
Aksözen, M; Hassler, U; Rivallain, M and Kohler, N (2017) Mortality analysis of an urban building stock. Building Research & Information, 45(3), pp. 259-277. ISSN 0961-3218
Al Haj, R A and El-Sayegh, S M (2015) Time-cost optimization model considering float-consumption impact. Journal of Construction Engineering and Management, 141(5): 04015001, ISSN 0733-9364
Al-Rabady, R. (2026) Decolonising time: Vernacular villages and the politics of heritage temporality. Buildings & Cities, 7(1), pp. 740-756. ISSN 2632-6655
Ali, G M; Bouferguene, A and Al-Hussein, M (2023) Crane mat layout optimization based on agent-based greedy and reinforcement-learning approach. Journal of Construction Engineering and Management, 149(8): 04023067, ISSN 0733-9364
Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry. PhD thesis, Brunel University, UK.
Alshibani, A; El Ghazzawi, Y A; Mohammed, A; Ghaithan, A M and Hassanain, M A (2024) A multi-criteria decision-making model for heavy construction equipment replacement in Saudi Arabia. Journal of Financial Management of Property and Construction, 29(3), pp. 485-511. ISSN 1366-4387
Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Ariyachandra, M F (2021) Automating the generation of geometric information models to support digital twinning of existing rail infrastructure. PhD thesis, University of Cambridge, UK.
Babatunde, S O; Ekundayo, D; Adekunle, A O and Bello, W (2020) Comparative analysis of drivers to BIM adoption among AEC firms in developing countries: A case of Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1425-1447. ISSN 1726-0531
Babatunde, S O; Perera, S; Ekundayo, D and Adeleye, T E (2020) An investigation into BIM-based detailed cost estimating and drivers to the adoption of BIM in quantity surveying practices. Journal of Financial Management of Property and Construction, 25(1), pp. 61-81. ISSN 1366-4387
Baiden, B K (2006) Framework for the integration of the project delivery team. PhD thesis, Loughborough University, UK.
Bassanino, M; Fernando, T and Wu, K C (2014) Can virtual workspaces enhance team communication and collaboration in design review meetings? Architectural Engineering and Design Management, 10(3-4), pp. 200-217. ISSN 1745-2007
Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099
Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(4), pp. 686-696. ISSN 1562-3599
Blacud, N A; Bogus, S M; Diekmann, J E and Molenaar, K R (2009) Sensitivity of construction activities under design uncertainty. Journal of Construction Engineering and Management, 135(3), pp. 199-206. ISSN 0733-9364
Bogus, S M (2004) Concurrent engineering strategies for reducing design delivery time. PhD thesis, University of Colorado at Boulder, USA.
Bogus, S M; Diekmann, J E; Molenaar, K R; Harper, C; Patil, S and Lee, J S (2011) Simulation of overlapping design activities in concurrent engineering. Journal of Construction Engineering and Management, 137(11), pp. 950-957. ISSN 0733-9364
Bogus, S M; Molenaar, K R and Diekmann, J E (2005) Concurrent engineering approach to reducing design delivery time. Journal of Construction Engineering and Management, 131(11), pp. 1179-1185. ISSN 0733-9364
Caldas, C H; Torrent, D G and Haas, C T (2006) Using global positioning system to improve materials-locating processes on industrial projects. Journal of Construction Engineering and Management, 132(7), pp. 741-749. ISSN 0733-9364
Changwang, S; Shaowei, H; Haifen, Z; Fuqu, P; Changxi, S and Hao, Q (2024) Automatic detection of water supply pipe defects based on underwater image enhancement and improved yolox. Journal of Construction Engineering and Management, 150(10): 04024134, ISSN 0733-9364
Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988
Chen, J H; Hayati, D W; Su, Y M; Wijatmiko, I and Purnamasari, R (2019) Improving preliminary cost estimation in Indonesia using support vector regression. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 25-33. ISSN 17514304
Choi, K (2008) A new decision-support model for innovative contracting strategies through a quantitative analysis on aspects of project performance. PhD thesis, University of California, Berkeley, USA.
Crowley, L G (2000) Friedman and gates: another look. Journal of Construction Engineering and Management, 126(4), pp. 306-312. ISSN 0733-9364
Cusumano, L; Farmakis, O; Granath, M; Olsson, N; Jockwer, R and Rempling, R (2025) Current benefits and future possibilities with digital field reporting. International Journal of Construction Management, 25(5), pp. 572-583. ISSN 1562-3599
Dallasega, P; Schulze, F and Revolti, A (2023) Augmented reality to overcome visual management implementation barriers in construction: A mep case study. Construction Management and Economics, 41(3), pp. 232-255. ISSN 01446193
Dan, Y and Liu, G (2024) Integrated scheduling optimization of production and transportation for precast component with delivery time window. Engineering, Construction and Architectural Management, 31(8), pp. 3335-3355. ISSN 0969-9988
Dardouri, S; BuHamdan, S; Al Balkhy, W; Dakhli, Z; Danel, T and Lafhaj, Z (2023) RFID platform for construction materials management. International Journal of Construction Management, 23(14), pp. 2509-2519. ISSN 1562-3599
Delgado-Hernández, D J and Palacios-Navarro, U J (2024) A Bayesian network for selecting improvement management tools to increase customer satisfaction in the construction industry: Case study of Mexico. Engineering, Construction and Architectural Management, 31(7), pp. 2900-2915. ISSN 0969-9988
Dunn, P J; Oyegoke, A S; Ajayi, S; Palliyaguru, R and Devkar, G (2023) Challenges and benefits of led retrofit projects: A case of salix financed secondary school in the UK. Journal of Engineering, Design and Technology, 21(6), pp. 1883-1900. ISSN 1726-0531
Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: I. Conceptual framework and qualitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016049, ISSN 0733-9364
Dzeng, R J; Wang, W C and Tserng, H P (2004) Module-based construction schedule administration for public infrastructure agencies. Journal of Construction Engineering and Management, 130(1), pp. 5-14. ISSN 0733-9364
Eadie, R; Perera, S; Heaney, G and Carlisle, J (2007) Construction contractor's perspective on web-based advertising of public sector construction contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
El Anwar, O H E D (2009) Multi-objective optimization for temporary housing arrangements after natural disasters. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364
Emsley, M W (2001) A model to optimize single tower crane location within a construction site. PhD thesis, Loughborough University, UK.
Faircloth, Adam D (2022) Development of a non-destructive evaluation system for mass timber panels. MPhil thesis, Griffith University, Australia.
Fan, L C N (2001) Strategic quality management for construction organisations. DBA thesis, Brunel University, UK.
Ghafoori, M and Abdallah, M (2025) Multi-criteria decision support model for material and supplier selection in the construction industry. International Journal of Construction Management, 25(4), pp. 409-418. ISSN 1562-3599
Glass, A (2011) Analysis of building-integrated renewable energy systems in modern UK homes. EngD thesis, University of Manchester, UK.
Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Gledson, B J and Greenwood, D (2014) The implementation and use of 4D BIM and virtual construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Hamiani, A (1987) Consite: A knowledge-based expert system framework for construction site layout. PhD thesis, University of Texas at Austin, USA.
Han, J; Chen, C; Tiong, R L K; Wu, K and Chew, D K H (2024) Strategic workforce planning for production of prefabricated bathroom units: An advanced markovian approach. Journal of Construction Engineering and Management, 150(8): 04024097, ISSN 0733-9364
Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364
Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains. PhD thesis, University of Washington, USA.
Hosseinian, S M (2016) An optimal time incentive/disincentive -based compensation in contracts with multiple agents. Construction Economics and Building, 16(4), pp. 35-53. ISSN 2204-9029
Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175
Hulathdoowage, N D and Hadiwattage, C (2022) Applicability of drywall technologies for disaster-induced housing reconstruction. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 498-515. ISSN 1759-5916
Idoro, G (2012) Comparing levels of use of project plans and performance of traditional contract and design-build construction projects in Nigeria. Journal of Engineering, Design and Technology, 10(1), pp. 7-33. ISSN 1726-0531
Idoro, G I (2012) The influence of project documents on the outcome of construction projects procured by traditional contracts in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 1-19. ISSN 1823-6499
Ikuabe, M; Aigbavboa, C and Kissi, E (2023) Potential applications and benefits of humanoids in the construction industry: A south African perspective. International Journal of Building Pathology and Adaptation, 41(6), pp. 254-268. ISSN 23984708
Ipsilandis, P G (2007) Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management, 133(6), pp. 417-424. ISSN 0733-9364
Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.
Jonsson, H (2018) Production strategy in project based production within a house-building context. PhD thesis, Linköping University, Sweden.
Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.
Kandil, A and El-Rayes, K (2006) Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. Journal of Construction Engineering and Management, 132(5), pp. 491-498. ISSN 0733-9364
Laryea, S and Hughes, W (2009) How contractors in Ghana include risk in their bid prices. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Lerche, J; Enevoldsen, P and Seppänen, O (2022) Application of takt and kanban to modular wind turbine construction. Journal of Construction Engineering and Management, 148(2), ISSN 0733-9364
Liao, L; Teo, E A L and Low, S P (2017) A project management framework for enhanced productivity performance using building information modelling. Construction Economics and Building, 17(3), pp. 1-26. ISSN 2204-9029
Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364
Mandala, R S K and Nayaka, R R (2025) A state of art review on time, cost and sustainable benefits of modern construction techniques for affordable housing. Construction Innovation, 25(2), pp. 363-380. ISSN 1471-4175
Martinez, E; Reid, C K and Tommelein, I D (2019) Lean construction for affordable housing: a case study in Latin America. Construction Innovation, 19(4), pp. 570-593. ISSN 1471-4175
Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988
McCulloueh, B G and Gunn, P (1993) Construction field data acquisition with pen-based computers. Journal of Construction Engineering and Management, 119(2), pp. 374-384. ISSN 0733-9364
Meacham, B J (2022) Fire performance and regulatory considerations with modern methods of construction. Buildings & Cities, 3(1), pp. 464-487. ISSN 2632-6655
Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.
Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364
Mullens, M A and Arif, M (2006) Structural insulated panels: Impact on the residential construction process. Journal of Construction Engineering and Management, 132(7), pp. 786-794. ISSN 0733-9364
Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry. PhD thesis, Nottingham Trent University, UK.
Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X
Nuntasunti, S (2004) The effects of visual-based information logistics in construction. PhD thesis, North Carolina State University, USA.
Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities. PhD thesis, University of the West of England, Bristol, UK.
Omar, H and Mahdjoubi, L (2023) Practical solutions for improving the suboptimal performance of construction projects using Dubai construction projects as an example. Engineering, Construction and Architectural Management, 30(6), pp. 2185-2205. ISSN 0969-9988
Pena-Mora, F and Park, M (2001) Dynamic planning for fast-tracking building construction projects. Journal of Construction Engineering and Management, 127(6), pp. 445-456. ISSN 0733-9364
Poleacovschi, C; Javernick-Will, A and Tong, T (2017) The link between knowledge sharing connections and employee time savings: A social network analysis. Construction Management and Economics, 35(8-9), pp. 455-467. ISSN 01446193
Qian, Q K; Fan, K and Chan, E H W (2016) Regulatory incentives for green buildings: Gross floor area concessions. Building Research & Information, 44(5-6), pp. 675-693. ISSN 0961-3218
Saad, A; Ajayi, S O and Alaka, H A (2023) Trends in BIM-based plugins development for construction activities: A systematic review. International Journal of Construction Management, 23(16), pp. 2756-2768. ISSN 1562-3599
Shafiee, S; Piroozfar, P; Forberg, L F; Hansen, H N and Farr, E (2025) Enhancing efficiency and sustainability in construction: a product configurator for customizable off-site building solutions. Architectural Engineering and Design Management, 21(3), pp. 450-466. ISSN 1745-2007
Shamsai, M; Whitlatch, E and Sezen, H (2007) Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management, 133(11), pp. 864-870. ISSN 0733-9364
Shapira, A; Rosenfeld, Y and Mizrahi, I (2008) Vision system for tower cranes. Journal of Construction Engineering and Management, 134(5), pp. 320-332. ISSN 0733-9364
Shibeika, A and Harty, C (2015) Digital innovation in construction: Exploring the firm-projects interface. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Shrestha, H D; Yatabe, R; Bhandary, N P and Subedi, J (2012) Vulnerability assessment and retrofitting of existing school buildings: A case study of Aceh. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 52-65. ISSN 1759-5916
Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.
Sodeinde, G M (2021) Effect of entrepreneurial innovation on the performance of informal sector: A study of carpentry firms in Lagos State. PhD thesis, Kwara State University, Nigeria.
Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications. PhD thesis, KTH Royal Institute of Technology, Sweden.
Su, Y S (2017) Rebuild, retreat or resilience: Urban flood vulnerability analysis and simulation in Taipei. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 110-122. ISSN 1759-5916
Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364
Thomas, H R (2000) Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4), pp. 261-267. ISSN 0733-9364
Tork, A (2013) A real-time crane service scheduling decision support system (CSS-DSS) for construction tower cranes. PhD thesis, University of Central Florida, USA.
Walsh, K D; Hershauer, J C; Tommelein, I D and Walsh, T A (2004) Strategic positioning of inventory to match demand in a capital projects supply chain. Journal of Construction Engineering and Management, 130(6), pp. 818-826. ISSN 0733-9364
Wang, Zhichen (2025) Framework for automated change propagation from building information models to building energy models. PhD thesis, Carnegie Mellon University, USA.
Wernsman, M G (2008) The process of designing and constructing an accessible residence hall for people with disabilities on a public university campus. PhD thesis, Colorado State University, USA.
Whiteman, W E and Irwig, H G (1988) Disturbance scheduling technique for managing renovation work. Journal of Construction Engineering and Management, 114(2), pp. 191-213. ISSN 0733-9364
Withrow, J; Dadi, G; Nassereddine, H and Sturgill, R (2024) Asphalt material e-ticketing workflow: Qualitative and quantitative analysis. Journal of Construction Engineering and Management, 150(3): 04023164, ISSN 0733-9364
Withrow, Josh (2024) Impact of augmented documentation workflows on transportation agency asphalt paving operations: A qualitative and quantitative study. PhD thesis, University of Kentucky, USA.
Wu, H; Zhang, P; Li, H; Zhong, B; Fung, I W H and Lee, Y Y R (2022) Blockchain technology in the construction industry: Current status, challenges, and future directions. Journal of Construction Engineering and Management, 148(10): 03122007, ISSN 0733-9364
Xie, W; Zhao, T; Tang, J and Zhang, Y (2017) Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge. Journal of Construction Engineering and Management, 143(8): 04017059, ISSN 0733-9364
Xu, J; Teng, Y and Pan, W (2021) A BIM-LCA integrated method for enhancing efficiency of embodied carbon estimation of prefabricated high-rise buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Xu, Ming (2010) The value of critical project decisions: measurement and modelling. PhD thesis, University of Melbourne, Australia.
Yu, H; Tweed, T; Al-Hussein, M and Nasseri, R (2009) Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management, 135(8), pp. 782-790. ISSN 0733-9364
af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.