Items with Subject: stakeholder

Number of items: 121.

Adefila, A; Abuzeinab, A; Whitehead, T and Oyinlola, M (2020) Bottle house: Utilising appreciative inquiry to develop a user acceptance model. Built Environment Project and Asset Management, 10(4), pp. 567-583. ISSN 2044-124X

Adetooto, J; Windapo, A and Pomponi, F (2024) The use of alternative building technologies as a sustainable affordable housing solution: Perspectives from South Africa. Journal of Engineering, Design and Technology, 22(5), pp. 1447-1463. ISSN 1726-0531

Agapiou, A and Clark, B (2014) Construction mediation in Scotland: A comparison of the views and experiences of lawyers and end-users. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Agyefi-Mensah, S; Post, J; van Egmond, E; Badu, E and Mohammadi, M (2015) The need for post-occupancy evaluation of public apartment buildings in Ghana. Journal of Engineering, Design and Technology, 13(2), pp. 315-333.

Ahmed, V; Saboor, S; Almarzooqi, F A; Alshamsi, H A; Alketbi, M A and Al Marei, F A (2021) A comparative study of energy performance in educational buildings in the UAE. Construction Economics and Building, 21(3), pp. 33-57. ISSN 2204-9029

Akeel, N F (1989) A database tool for statistically based construction cost estimate. PhD thesis, University of Colorado at Boulder, USA.

Al Bunni, A (2020) Refurbishment of UK state school buildings: a strategy and framework for BIM-based digital twinning. PhD thesis, De Montfort University, UK.

Al Ghazal, H (2018) Post occupancy evaluation involving end users in Saudi Arabian office buildings through the use of a shortened quality function deployment method. PhD thesis, University of Manchester, UK.

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.

Alasad, R and Motawa, I (2015) Dynamic demand risk assessment for toll road projects. Construction Management and Economics, 33(10), pp. 799-817. ISSN 01446193

Alketbi, S R (2020) Effective implementation of value engineering in the housing construction programmes of the UAE. PhD thesis, University of Wolverhampton, UK.

Alzaed, A (2012) User centered passive building design. PhD thesis, University of Liverpool, UK.

Alzaed, A and Boussabaine, A H (2012) A conceptual model for user-centred passive building design. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Amadi, C; Carrillo, P and Tuuli, M (2014) Stakeholder management in public private partnership projects in Nigeria: Towards a research agenda. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Aritua, B; Smith, N J and Athiyo, R (2008) Private finance for the delivery of school projects in England. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 141-146. ISSN 17514312

Assaf, S; Hassanain, M A and Abdallah, A (2018) Review and assessment of the causes of deficiencies in design documents for large construction projects. International Journal of Building Pathology and Adaptation, 36(3), pp. 300-317. ISSN 23984708

Attia, D A; Maarouf, I; Taha, D and Nassar, D (2020) Detecting failures in conservation practice in relation to cultural significance: The case of heritage buildings in Khartoum. Building Research & Information, 48(2), pp. 124-139. ISSN 0961-3218

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Banks, C; Kotecha, R; Curtis, J; Dee, C; Pitt, N and Papworth, R (2018) Enhancing high-rise residential construction through design for manufacture and assembly: A UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 164-174. ISSN 17514304

Barthel, P-A (2016) Morocco in the era of eco-urbanism: Building a critical and operational research on an emerging practice in Africa. Smart and Sustainable Built Environment, 5(3), pp. 272-288. ISSN 2046-6099

Baweshkha, Monair Ali (2021) Integrating project management office and organisational change management processes for better implementation and adoption of e-health strategy in Saudi Arabia. PhD thesis, RMIT University, Australia.

Bortolini, R and Forcada, N (2020) Analysis of building maintenance requests using a text mining approach: Building services evaluation. Building Research & Information, 48(2), pp. 207-217. ISSN 0961-3218

Bortolini, R and Forcada, N (2020) A probabilistic performance evaluation for buildings and constructed assets. Building Research & Information, 48(8), pp. 838-855. ISSN 0961-3218

Caldwell, Scott A (2024) Empirical decision-making tools as applied to seaports in the industry 4.0 paradigm. PhD thesis, Liverpool John Moores University, UK.

Cao, D; Shao, S; Huang, B and Wang, G (2022) Multidimensional behavioral responses to the implementation of BIM in construction projects: An empirical study in China. Engineering, Construction and Architectural Management, 29(2), pp. 819-841. ISSN 0969-9988

Chan, K H (2010) Critica factors in adopting cooling media for central air-conditioning systems in Hong Kong. Architectural Engineering and Design Management, 6(1), pp. 31-47. ISSN 1745-2007

Clark, P I (2011) CDM regulations: safety targeted assessment through gateway evaluation (stage) approach. PhD thesis, University of the West of England, Bristol, UK.

Dadi, G B; Goodrum, P M; Taylor, T R B and Carswell, C M (2014) Cognitive workload demands using 2D and 3D spatial engineering information formats. Journal of Construction Engineering and Management, 140(5): 04014001, ISSN 0733-9364

Daniel, E I; Pasquire, C and Dickens, G (2014) Social perspective of planning in construction: The UK experience. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

De La Garza, J M and Mitropoulos, P (1992) Flavors and mixins of expert systems technology transfer model for AEC industry. Journal of Construction Engineering and Management, 118(3), pp. 435-453. ISSN 0733-9364

Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.

Elgendi, E M O (2016) An automated dynamic site layout planning system: a case study of Egypt. PhD thesis, University of Salford, UK.

Elshaboury, N; Mohammed Abdelkader, E; Al-Sakkaf, A and Bagchi, A (2025) A deep convolutional neural network for predicting electricity consumption at grey nuns building in Canada. Construction Innovation, 25(2), pp. 270-289. ISSN 1471-4175

Faris, E; Matarneh, S; Talebi, S; Kagioglou, M; Hosseini, M R and Abrishami, S (2021) Toward digitalization in the construction industry with immersive and drones technologies: A critical literature review. Smart and Sustainable Built Environment, 10(3), pp. 345-363. ISSN 2046-6099

Fieldson, R (2017) The afterlife clause; towards a strategy for improved adaptation in retail property. International Journal of Building Pathology and Adaptation, 35(4), pp. 364-379.

Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Forcada, N; Macarulla, M; Gangolells, M and Casals, M (2016) Handover defects: Comparison of construction and post-handover housing defects. Building Research & Information, 44(3), pp. 279-288. ISSN 0961-3218

Gana, V F G; Giridharan, R and Watkins, R (2018) Application of soft landings in the design management process of a non-residential building. Architectural Engineering and Design Management, 14(3), pp. 178-193. ISSN 1745-2007

Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.

Griffis, F H and Butler, M (1988) Case for cost-plus contracting. Journal of Construction Engineering and Management, 114(1), pp. 83-94. ISSN 0733-9364

Hardie, M; Allen, J and Newell, G (2013) Environmentally driven technical innovation by Australian construction SMEs. Smart and Sustainable Built Environment, 2(2), pp. 179-191. ISSN 2046-6099

Hay, R; Samuel, F; Watson, K J and Bradbury, S (2018) Post-occupancy evaluation in architecture: Experiences and perspectives from UK practice. Building Research & Information, 46(6), pp. 698-710. ISSN 0961-3218

Hesselink, L; Vahdatikhaki, F; Harmsen, Y and Voordijk, H (2024) Usability analysis of virtual-reality-enabled digital twin for the inspection of sewage pumping stations. International Journal of Construction Management, 24(13), pp. 1419-1430. ISSN 1562-3599

Hewa Welege, N M; Pan, W and Kumaraswamy, M M (2023) Engaging stakeholders to overcome the common constraints for delivering low carbon buildings in high-rise high-density cities. Journal of Construction Engineering and Management, 149(1): 04022157, ISSN 0733-9364

Hidayat, B (2013) The role of knowledge communication in the effective management of post-disaster reconstruction projects in Indonesia. PhD thesis, University of Salford, UK.

Holmes, Matthew Ian (2013) The application of structural contingency theory to supply chain management: Developing a strategic model for prefabricated timber systems. PhD thesis, University of Technology Sydney, Australia.

Huang, X (2003) The owner's role in construction safety. PhD thesis, University of Florida, USA.

Ilter, D and Dikbas, A (2008) The use of key attrıbutes ın alternatıve dıspute resolutıon (ADR) process desıgn. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Jacobs, Y L (2024) Barriers to the implementation of lean construction in South Africa. PhD thesis, University of Pretoria, South Africa.

Jaiswal, S and Kar, S (2025) A decision support system for optimizing labor acquisition in construction. Journal of Construction Engineering and Management, 151(12): 04025211, ISSN 0733-9364

Jensen, P A (2011) Inclusive briefing and user involvement: Case study of a media centre in Denmark. Architectural Engineering and Design Management, 7(1), pp. 38-49. ISSN 1745-2007

Juliana, A; Oladimeji, O; Abiodun, A O; Haddad, A N and Tam, V W Y (2024) Influence of rework on construction project performance in Nigeria. International Journal of Construction Management, 24(8), pp. 888-893. ISSN 1562-3599

Kamardeen, I (2010) Knowledge-based occupational health and safety planning for construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kamari, A; Kotula, B M and Schultz, C P L (2022) A BIM-based LCA tool for sustainable building design during the early design stage. Smart and Sustainable Built Environment, 11(2), pp. 217-244. ISSN 2046-6099

Kasprzak, C and Dubler, C (2012) Aligning BIM with FM: Streamlining the process for future projects. Construction Economics and Building, 12(4), pp. 68-77. ISSN 2204-9029

Kim, C; Kim, H; Ryu, J and Kim, C (2011) Ubiquitous sensor network for construction material monitoring. Journal of Construction Engineering and Management, 137(2), pp. 158-165. ISSN 0733-9364

Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach. PhD thesis, Nottingham Trent University, UK.

Kumar, S (2013) Experience-based design review of healthcare facilities using interactive virtual prototypes. PhD thesis, Pennsylvania State University, USA.

Kumaraswamy, M M and Morris, D A (2002) Build-operate-transfer-type procurement in Asian megaprojects. Journal of Construction Engineering and Management, 128(2), pp. 93-102. ISSN 0733-9364

Latorre, V (2009) Construction manager's influence on project success. PhD thesis, University of Plymouth, UK.

Lee, J K (2011) Building environment rule and analysis (BERA) language and its application for evaluating building circulation and spatial program. PhD thesis, Georgia Institute of Technology, USA.

Lees, T and Sexton, M (2012) The domestication and use of low and zero carbon technologies in new homes. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Loria Arcila, J H (2002) Major issues impacting affordable housing developments in Mexico. PhD thesis, Georgia Institute of Technology, USA.

Löfgren, A (2005) Socio-technical management of collaborative mobile computing in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

McElroy, D J and Rosenow, J (2019) Policy implications for the performance gap of low-carbon building technologies. Building Research & Information, 47(5), pp. 611-623. ISSN 0961-3218

McFarland, A E (2010) An end user approach to teaching specifications. International Journal of Construction Education and Research, 6(2), pp. 83-103. ISSN 1557-8771

Mlecnik, E (2013) Innovation development for highly energy-efficient housing: Opportunities and challenges related to the adoption of passive houses. PhD thesis, Delft University of Technology, Netherlands.

Mohlasedi, K M and Nkado, R N (1997) The role of stakeholders in the delivery of affordable housing schemes in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Montes Victorio, Shani A (2024) A comprehensive framework for stakeholder management in utility coordination on highway projects. PhD thesis, Iowa State University, USA.

Moyo, Cynthia; Moyo, Tirivavi and Mudombo, Mabel Vongai (2026) Integrating sustainable materials into construction: A review of Zimbabwe’s model building by-laws. Journal of Construction Business and Management, 8(S1), pp. 99-110. ISSN 2521-0165

Muzir, A K K (2017) School buildings maintenance in Malaysia: Current practices, key challenges and implications. PhD thesis, University of Newcastle upon Tyne, UK.

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.

Ninan, J; Mantha, B R K and Kesavan, B (2025) Human-centred cybersecurity for critical infrastructure: The case of the Florida water plant hack. Engineering, Construction and Architectural Management, 32(13), pp. 547-569. ISSN 0969-9988

Nour, H A (2003) An information approach for enhancing the health and safety file. PhD thesis, University of Manchester, UK.

Ogbu, C P (2017) Building quality condition and maintenance cost: The case of public low income housing in Abia State, Nigeria. Journal of Construction Business and Management, 1(2), pp. 24-34. ISSN 2521-0165

Oladiran, O J; Ogunsanmi, O E and Dada, M O (2019) Frameworks for material waste minimization on Nigerian building projects. Journal of Construction Business and Management, 3(1), pp. 45-61. ISSN 2521-0165

Oliva, Carolina Asensio (2019) Target value design in the real estate market with units for sale: Model and guidelines for implementation. PhD thesis, Universidade Estadual de Campinas, Brazil.

Osaily, Y; Copping, A; McCann, S and Uddin, T (2019) Exploring the value of demolition contractor involvement at the design stage of construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Otegbulu, A C; Osagie, J U and Famuyiwa, F (2009) A value hierarchy study of building services/components in commercial and residential developments: A comparative analysis. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.

Painting, N J; Piroozfar, P A E and Farr, E R P (2014) Refurbishment of higher education premises: Stakeholder engagement in the process and product. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Panayamkandi, R (2007) Development of a design process map for improving the efficiency of small and medium sized building consulting practices. PhD thesis, Heriot-Watt University, UK.

Parvar, J; Lowe, D; Emsley, M and Duff, A R (2000) Neural networks as a decision support system for the decision to bid process. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Pasquire, C and Salvatierra-Garrido, J (2011) Introducing the concept of first and last value to aid lean design: Learning from social housing projects in Chile. Architectural Engineering and Design Management, 7(2), pp. 128-138. ISSN 1745-2007

Payne, S R; Mackrill, J; Cain, R; Strelitz, J and Gate, L (2015) Developing interior design briefs for health-care and well-being centres through public participation. Architectural Engineering and Design Management, 11(4), pp. 264-279. ISSN 1745-2007

Pim-Wusu, M; Simpeh, E K and Simberi, J N N (2025) Ascertaining adequacy of fire suppression systems: The perspective of Accra central of Ghana. Journal of Engineering, Design and Technology, 23(3), pp. 917-934. ISSN 1726-0531

Rahbar, F (1997) Computer-aided parametric planning (CAPP). PhD thesis, Iowa State University, USA.

Rana, V.; Singh, V.; Singh, A. R.; Rao, M. S. and Kashyap, K. (2026) Promoting real estate sensitivity among AEC students: A board game-based approach to applied learning. Architectural Engineering and Design Management, 22(1), pp. 149-167. ISSN 1745-2007

Reiter, Dana L (2018) Increasing the effectiveness of stakeholder engagement in the use of environmental decision support systems. PhD thesis, Queensland University of Technology, Australia.

Rodrigues, Patrick Borges (2025) A user-centered framework for designing sensory-enhanced teleoperation interfaces for construction robots. PhD thesis, University of Southern California, USA.

Rohman, Mohammad Arif (2017) Stakeholders' perspective on achieving project social benefit from Indonesian toll roads. PhD thesis, University of Melbourne, Australia.

Roza, C (2006) Environmental assessment: The Eden project. PhD thesis, University College London, UK.

Sagoo, A S (2014) A decision support system for evaluating local authority housing maintenance strategies in the United Kingdom. PhD thesis, University of Derby, UK.

Schoenefeldt, H (2019) The House of Commons: A precedent for post-occupancy evaluation. Building Research & Information, 47(6), pp. 635-665. ISSN 0961-3218

Seki, Y; Sutrisna, M and Olanipekun, A O (2021) Integrating a rich picture diagram and causal loop diagram to model stakeholder engagement in building refurbishment projects. Engineering, Construction and Architectural Management, 28(7), pp. 1929-1951. ISSN 0969-9988

Sharafi, A; Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of financial conflicts in the operation phase of public-private partnership contracts. Journal of Construction Engineering and Management, 147(6): 78622011, ISSN 0733-9364

Sharqi, R I A (2017) Developing a system for health and safety enhancement and automation in construction sites. PhD thesis, Heriot-Watt University, UK.

Sheriff, A M; Bouchlaghem, D; El-Hamalawi, A and Yeomans, S (2011) Developing a metadata standard for multimedia content management: A case study. Architectural Engineering and Design Management, 7(3), pp. 157-176. ISSN 1745-2007

Stankos, M A (2020) The nature of evidence utilized in healthcare architectural design decisions at five Midwestern critical access hospitals. PhD thesis, University of Missouri - Columbia, USA.

Tanyer, A M (2004) Implementation barriers of computer integrated construction: A usability perspective. PhD thesis, University of Salford, UK.

Tiwari, A; Singh, S; Routroy, S; Gopinath, A and Sahu, P K (2025) Analysing critical risk factors of Indian road construction projects: a fuzzy DEMATEL approach. International Journal of Construction Management, 25(4), pp. 469-480. ISSN 1562-3599

Tonna, Ren P (2021) How stakeholders experience and value the sustainable design elements of a residential high-rise building. PhD thesis, Griffith University, Australia.

Trethewy, R W and Atkinson, M (2003) Enhanced safety, health and environment outcomes through improved design. Journal of Engineering, Design and Technology, 1(2), pp. 187-201. ISSN 1726-0531

Tutesigensi, A and Pleim, V (2008) Why small and medium construction enterprises do not employ six sigma. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Tutt D, H C (2013) Journeys through the cave: The use of 3D immersive environments for client engagement practices in hospital design. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Udawatta, N; Zuo, J; Chiveralls, K and Zillante, G (2015) Attitudinal and behavioural approaches to improving waste management on construction projects in Australia: Benefits and limitations. International Journal of Construction Management, 15(2), pp. 137-147. ISSN 1562-3599

Villacis Jr., J E (1999) The component architecture toolkit. PhD thesis, Indiana University, USA.

Wade, F; Shipworth, M and Hitchings, R (2017) How installers select and explain domestic heating controls. Building Research & Information, 45(4), pp. 371-383. ISSN 0961-3218

Wang, B (2014) End user oriented BIM enabled multi-functional virtual environment supporting building emergency planning and evacuation. PhD thesis, Cardiff University, UK.

Wanigarathna, N; Jones, K; Pascale, F; Morga, M and Meslem, A (2023) Cost–benefit analysis to appraise technical mitigation options for earthquake-induced liquefaction disaster events. Journal of Financial Management of Property and Construction, 28(2), pp. 220-241. ISSN 1366-4387

Whitaker, R (2022) The influence of end user requirements to inform built asset design. PhD thesis, Leeds Beckett University, UK.

Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(2), pp. 291-309. ISSN 1609-9451

Wusu, G; Alaka, H; Oseghale, R; Yusuf, W; Funlade, S and Saheed, A (2026) A qualitative assessment of offsite construction awareness in the United Kingdom: Construction industry experts' view. Building Research & Information, 54(3), pp. 359-377. ISSN 0961-3218

Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yang, R J and Zou, P X W (2016) Building integrated photovoltaics (BIPV): Costs, benefits, risks, barriers and improvement strategy. International Journal of Construction Management, 16(1), pp. 39-53. ISSN 1562-3599

Yeung, J F Y; Chan, A P C; Chan, D W M; Chiang, Y H and Yang, H (2013) Developing a benchmarking model for construction projects in Hong Kong. Journal of Construction Engineering and Management, 139(6), pp. 705-716. ISSN 0733-9364

Zolghadr, Ali (2023) Innovative offsite construction uptake in the housebuilding sector: A systemic approach to economic justifiability for volume builders. PhD thesis, RMIT University, Australia.

Zou, P X W; Wang, S and Fang, D (2008) A life-cycle risk management framework for PPP infrastructure projects. Journal of Financial Management of Property and Construction, 13(2), pp. 123-142. ISSN 1366-4387

Zou, Y; Wu, Y; Guo, B H W; Papadonikolaki, E; Dimyadi, J and Hung, S N (2022) Investigating the New Zealand off-site manufacturing industry's readiness for automated compliance checking. Journal of Construction Engineering and Management, 148(12): 05022013, ISSN 0733-9364

Zubair, M U; Zhang, X and Hassan, M U (2024) Aligning expectations and perceptions of elevator maintenance stakeholders: An application of expectation confirmation theory. Building Research & Information, 52(4), pp. 418-430. ISSN 0961-3218

This list was generated on Sat Aug 22 02:43:42 2026 UTC.