Items with Subject: site logistics

Number of items: 244.

Abdel-Fattah, A (2013) Dynamic site layout planning model. PhD thesis, University of Calgary, Canada.

Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599

Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects. DEng thesis, George Washington University, USA.

Abdul-Aziz, A-R (1998) Adapting procurement practices to suit a host country as a probable localization tactic. Journal of Construction Procurement, 4(1), pp. 45-58. ISSN 1358-9180

Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193

Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193

Aghajamali, K; Nekouvaght Tak, A; Taghaddos, H; Mousaei, A; Behzadipour, S and Hermann, U (2023) Planning of mobile crane walking operations in congested industrial construction sites. Journal of Construction Engineering and Management, 149(7): 04023047, ISSN 0733-9364

Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.

Ahadzie, D K; Proverbs, D G and Olomolaiye, P O (2008) Model for predicting the performance of project managers at the construction phase of mass house building projects. Journal of Construction Engineering and Management, 134(8), pp. 618-629. ISSN 0733-9364

Al-Jibouri, S and Mawdesley, M J (2001) Development and application of a stochastic based cost prediction model for construction. Journal of Financial Management of Property and Construction, 6(1), pp. 61-69. ISSN 1366-4387

Al-Sudairi, A A (2000) Evaluation of construction processes: Traditional practices versus lean principles. PhD thesis, University of Colorado at Boulder, USA.

AlSaggaf, A and Jrade, A (2023) Arcspat: An integrated building information modeling (BIM) and geographic information system (GIS) model for site layout planning. International Journal of Construction Management, 23(3), pp. 505-527. ISSN 1562-3599

Alkoc, E and Erbatur, F (1998) Site expert: A prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(3), pp. 238-251. ISSN 0969-9988

Altuwaim, A A (2018) Optimal scheduling and resource utilization for repetitive construction projects. PhD thesis, University of Illinois, USA.

Amadi, A I (2021) A back-end view to climatic adaptation: Partitioning weather-induced cement demand variance in wet humid environment. International Journal of Building Pathology and Adaptation, 39(2), pp. 153-174. ISSN 23984708

Amarasinghe, Sam (2025) Performance optimizing for precast concrete construction. PhD thesis, Queensland University of Technology, Australia.

Amaratunga, C A (2014) Building community disaster resilience through a virtual community of practice (VCOP). International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 66-78. ISSN 1759-5916

Amiri, R; Majrouhi Sardroud, J and Momenaei Kermani, V (2023) Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model. Engineering, Construction and Architectural Management, 30(4), pp. 1444-1462. ISSN 0969-9988

An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988

Arashpour, M; Wakefield, R; Blismas, N and Abbasi, B (2016) Quantitative analysis of rate-driven and due date-driven construction: Production efficiency, supervision, and controllability in residential projects. Journal of Construction Engineering and Management, 142(1): 05015012, ISSN 0733-9364

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran. PhD thesis, Nottingham Trent University, UK.

Auradkar, P K; Raykar, A; Agarwal, I; Sitaram, D and Manavalan R (2022) Accuracy assessment and performance analysis of raster to vector conversions on lulc data: India. Journal of Engineering, Design and Technology, 20(6), pp. 1787-1809. ISSN 1726-0531

Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.

Beliveau, Y J (1984) A cost control model for on-site work activities for construction (estimating, cost-codes, forms). PhD thesis, Purdue University, USA.

Benjaoran, V and Peansupap, V (2020) Grid-based construction site layout planning with particle swarm optimisation and travel path distance. Construction Management and Economics, 38(8), pp. 673-688. ISSN 01446193

Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193

Bernold, L E (1985) Productivity transients in construction processes. PhD thesis, Georgia Institute of Technology, USA.

Borges, Maria Luiza Abath Escorel (2025) Decision-making optimization method for construction site layout planning based on slp and BIM. PhD thesis, Universidade Estadual de Campinas, Brazil.

Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems. PhD thesis, University of California, Berkeley, USA.

Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364

Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364

Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364

Chen, R (2025) Investigation of mechanical and thermal performances and masonry quality for new raw soil-based insulating hollow bricks. Architectural Engineering and Design Management, 21(3), pp. 533-552. ISSN 1745-2007

Chen, S; Tian, Y; Jin, L and Xiang, L (2021) Estimating the frequency of exposure to uncertain hazards: Impact of wind conditions on concrete dam construction. Journal of Construction Engineering and Management, 147(2): 04020167, ISSN 0733-9364

Cheng, M Y and O'Connor, J T (1996) Arcsite: Enhanced GIS for construction site layout. Journal of Construction Engineering and Management, 122(4), pp. 329-336. ISSN 0733-9364

Cheng, M Y and Yang, S C (2001) GIS-based cost estimates integrating with material layout planning. Journal of Construction Engineering and Management, 127(4), pp. 291-299. ISSN 0733-9364

Cheng, M-Y (1992) Automated site layout of temporary construction facilities using geographic information systems (GIS). PhD thesis, University of Texas at Austin, USA.

Cheung, S-O (1997) Risk allocation: an essential tool for construction project management. Journal of Construction Procurement, 3(1), pp. 16-27. ISSN 1358-9180

Christodoulou, S E; Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5), pp. 518-527. ISSN 0733-9364

Chua, D K H; Yeoh, K W and Song, Y (2010) Quantification of spatial temporal congestion in four-dimensional computer-aided design. Journal of Construction Engineering and Management, 136(6), pp. 641-649. ISSN 0733-9364

Cribbs, J (2016) Workflow management using building information modeling (BIM) for prefabrication in a construction retrofit environment. PhD thesis, Arizona State University, USA.

Curran, M and Spillane, J P (2020) External stakeholder management and engagement on urban construction projects in Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(2), pp. 59-68. ISSN 17514304

Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364

Dania, A A (2017) Sustainable construction at the firm level: case studies from Nigeria. PhD thesis, University of Reading, UK.

Das, M (2015) Social BIMCloud: a distributed cloud-based BIM framework for object-based lifecycle information exchange and supply chain integration. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193

Deshpande, S D (1988) Some facility planning techniques for construction site layouts. PhD thesis, Indian Institute of Technology Delhi, India.

Dewlaney, K S and Hallowell, M (2012) Prevention through design and construction safety management strategies for high performance sustainable building construction. Construction Management and Economics, 30(2), pp. 165-177. ISSN 1466433X

Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects. PhD thesis, Nottingham Trent University, UK.

Easa, S M and Hossain, K M A (2008) New mathematical optimization model for construction site layout. Journal of Construction Engineering and Management, 134(8), pp. 653-662. ISSN 0733-9364

East, E W and Liu, L Y (2006) Multiproject planning and resource controls for facility management. Journal of Construction Engineering and Management, 132(12), pp. 1294-1305. ISSN 0733-9364

El Meouche, R; Abunemeh, M; Hijaze, I; Mebarki, A and Shahrour, I (2018) Developing optimal paths for evacuating risky construction sites. Journal of Construction Engineering and Management, 144(2): 04017099, ISSN 0733-9364

El-Rayes, K (2001) Optimum planning of highway construction under A+B bidding method. Journal of Construction Engineering and Management, 127(4), pp. 261-269. ISSN 0733-9364

El-Rayes, K and Jun, D H (2009) Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), pp. 1172-1180. ISSN 0733-9364

El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364

El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364

El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364

El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(5), pp. 639-653. ISSN 0969-9988

ElNimr, A A (2011) Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework. PhD thesis, University of Alberta, Canada.

Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364

Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988

Elbeltagi, E; Hegazy, T and Eldosouky, A (2004) Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130(4), pp. 534-541. ISSN 0733-9364

Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193

Elgendi, E M O (2016) An automated dynamic site layout planning system: a case study of Egypt. PhD thesis, University of Salford, UK.

Elnaas, H; Ashton, P and Gidado, K (2009) Decision making process for using off-site manufacturing systems for housing projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Emuze, F (2017) The human contribution to unsafe construction acts and conditions in the central region of South Africa. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Emuze, F (2018) Foreseeing countermeasures for construction safety violations in South Africa. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Emuze, F (2019) Conceptual argument about drift into failure masked by work pressures on construction sites in South Africa. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Emuze, F (2020) Factors causing fatigue and safety-related errors on construction sites in bloemfontein. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Emuze, F (2021) Fortifying management control of health, safety and productivity loss in South African construction. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Emuze, F (2022) Examining exploitation and its influence on construction sites in South Africa. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Escamilla, E (2011) Investigation of project management planning practices for renovation of historical buildings in urban contexts located in Texas. PhD thesis, Texas A&M University, USA.

Fore, S and Mbohwa, C T (2010) Cleaner production for environmental conscious manufacturing in the foundry industry. Journal of Engineering, Design and Technology, 8(3), pp. 314-333. ISSN 1726-0531

Foroughi Sabzevar, M (2022) An AR-QR code approach to improve access of crews to design and construction information on construction sites. PhD thesis, Drexel University, USA.

Forsman, S; Björngrim, N; Bystedt, A; Laitila, L; Bomark, P and Öhman, M (2012) Need for innovation in supplying engineer-to-order joinery products to construction: A case study in Sweden. Construction Innovation, 12(4), pp. 464-491. ISSN 1471-4175

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Freitas, Márcia Regina de (2008) Computacional tool for support planning and elaboration of construction site layout. PhD thesis, Universidade de São Paulo, Brazil.

Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.

Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.

Ginige, K N; Amaratunga, R D G and Haigh, R (2007) Improving construction industry image to enhance women representation in the industry workforce. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Golparvar-Fard, M; Peña-Mora, F and Savarese, S (2011) Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. Journal of Construction Engineering and Management, 137(12), pp. 1099-1116. ISSN 0733-9364

Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029

Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.

Guven, G and Ergen, E (2021) Tracking major resources for automated progress monitoring of construction activities: Masonry work case. Construction Innovation, 21(4), pp. 648-667. ISSN 1471-4175

Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Task planning and control in construction: Revealing workers as early and late planners. Construction Management and Economics, 42(5), pp. 431-450. ISSN 01446193

Hamiani, A (1987) Consite: A knowledge-based expert system framework for construction site layout. PhD thesis, University of Texas at Austin, USA.

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(8), pp. 756-772. ISSN 01446193

Han, S; Bouferguene, A; Al-Hussein, M and Hermann, U R (2017) 3D-based crane evaluation system for mobile crane operation selection on modular-based heavy construction sites. Journal of Construction Engineering and Management, 143(9): 04017060, ISSN 0733-9364

Han, Sang Hyeok (2014) BIM-based motion planning of mobile crane operation in modular-based heavy construction sites. PhD thesis, University of Alberta, Canada.

Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassan, N M; Al Maazmi, T; Al Hadhrami, A and Al Hosani, M (2016) Discrete event simulation: A vital tool for a concurrent life cycle design. Construction Innovation, 16(1), pp. 67-80. ISSN 1471-4175

Hebiba, A M; Bouferguene, A; Moon, S and Han, S (2022) Wind-wise automated stability analysis for selection of tower crane and location. Journal of Construction Engineering and Management, 148(11): 04022127, ISSN 0733-9364

Heesom, D (2004) An analytical system for space planning on construction sites. PhD thesis, University of Wolverhampton, UK.

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.

Hillebrandt, P M and Meikle, J L (1985) Resource planning for construction. Construction Management and Economics, 3(3), pp. 249-263. ISSN 01446193

Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction. PhD thesis, University of Calgary, Canada.

Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193

Huang, C and Wong, C K (2017) Discretized cell modeling for optimal facility layout plans of unequal and irregular facilities. Journal of Construction Engineering and Management, 143(1): 04016082, ISSN 0733-9364

Hussein, M; Darko, A; Eltoukhy, A E E and Zayed, T (2022) Sustainable logistics planning in modular integrated construction using multimethod simulation and taguchi approach. Journal of Construction Engineering and Management, 148(6): 04022022, ISSN 0733-9364

Hyari, K; El-Mashaleh, M and Kandil, A (2010) Optimal assignment of multiskilled labor in building construction projects. International Journal of Construction Education and Research, 6(1), pp. 70-80. ISSN 1557-8771

Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X

Ibañez-Guzmán, J (1995) Modelling of on-site work cells for the simulation of automated and semi-automated construction. Construction Management and Economics, 13(5), pp. 427-434. ISSN 01446193

Igwe, C; Nasiri, F and Hammad, A (2022) Construction workspace management: Critical review and roadmap. International Journal of Construction Management, 22(10), pp. 1960-1973. ISSN 1562-3599

Ji, Y and Leite, F (2020) Optimized planning approach for multiple tower cranes and material supply points using mixed-integer programming. Journal of Construction Engineering and Management, 146(3): 04020007, ISSN 0733-9364

John, G A (2000) A virtual environment for safety-integrated site layout design and organisation. PhD thesis, Teesside University, UK.

Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364

Kamar, K A M (2011) Critical success factors to industrialised building system (IBS) contractor. PhD thesis, University of Salford, UK.

Kamardeen, I (2010) 8d BIM modelling tool for accident prevention through design. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kamaruddin S S, M M F and Mahbub R, Y R M (2013) Perception towards cost implication of mechanisation and automation approach in IBS projects in Malaysia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Kandil, A and El-Rayes, K (2006) Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. Journal of Construction Engineering and Management, 132(5), pp. 491-498. ISSN 0733-9364

Kandil, A; El-Rayes, K and El-Anwar, O (2010) Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction Engineering and Management, 136(1), pp. 17-25. ISSN 0733-9364

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kauffold, P V (1977) Critical resource allocation in stochastic project networks. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Khalafallah, A and El-Rayes, K (2006) Minimizing construction-related hazards in airport expansion projects. Journal of Construction Engineering and Management, 132(6), pp. 562-572. ISSN 0733-9364

Khalafallah, A and El-Rayes, K (2008) Minimizing construction-related security risks during airport expansion projects. Journal of Construction Engineering and Management, 134(1), pp. 40-48. ISSN 0733-9364

Khalafallah, A M (2006) Optimal construction site layout planning for airport expansion projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Khalili, A (2013) An IFC-based framework for optimizing level of prefabrication in industrialized building systems. PhD thesis, National University of Singapore, Singapore.

Kumar Dhar, T; Sk. Maruf Hossain, M and Rubayet Rahaman, K (2013) How does flexible design promote resource efficiency for housing? A study of Khulna, Bangladesh. Smart and Sustainable Built Environment, 2(2), pp. 140-157. ISSN 2046-6099

Lam, K C; Hu, T; Cheung, S O; Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(2), pp. 130-144. ISSN 0969-9988

Lam, K C; Ning, X and Lam, M C K (2009) Conjoining MMAS to GA to solve construction site layout planning problem. Journal of Construction Engineering and Management, 135(10), pp. 1049-1057. ISSN 0733-9364

Lam, K C; Ning, X and Ng, T (2007) The application of the ant colony optimization algorithm to the construction site layout planning problem. Construction Management and Economics, 25(4), pp. 359-374. ISSN 1466433X

Lam, K C; Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(2), pp. 127-145. ISSN 01446193

Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.

Le, P L; Dao, T M and Chaabane, A (2019) BIM-based framework for temporary facility layout planning in construction site: A hybrid approach. Construction Innovation, 19(3), pp. 424-464. ISSN 1471-4175

Lei, Z; Taghaddos, H; Olearczyk, J; Al-Hussein, M and Hermann, U (2013) Automated method for checking crane paths for heavy lifts in industrial projects. Journal of Construction Engineering and Management, 139(10): 04013011, ISSN 0733-9364

Lei, Zhen (2015) Automated simulation model for crane motion planning in heavy industrial projects. PhD thesis, University of Alberta, Canada.

Li, Y.; Tai, S. and Tai, Z. (2024) Development of ANP-based greenness evaluation model of construction technologies in China. Journal of Engineering, Design and Technology, 24(2), pp. 602-630. ISSN 1726-0531

Li, H; Chan, G; Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(5), pp. 536-550. ISSN 0969-9988

Li, Mei (2012) A waste management system for small and medium enterprises engaged in office building retrofit projects. PhD thesis, Queensland University of Technology, Australia.

Li, Z; Anson, M and Li, G (2001) A procedure for quantitatively evaluating site layout alternatives. Construction Management and Economics, 19(5), pp. 459-467. ISSN 01446193

Lim, Soon Kam (2009) Framework and processes for enhancing sustainability deliverables in Australian road infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Lingard, H; Cooke, T and Gharaie, E (2013) The how and why of plant-related fatalities in the Australian construction industry. Engineering, Construction and Architectural Management, 20(4), pp. 365-380. ISSN 0969-9988

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, L-Y (1991) Coops: Construction object-oriented process simulation system. PhD thesis, University of Michigan, USA.

Lu, M; Shen, X and Chen, W (2009) Automated collection of mixer truck operations data in highly dense urban areas. Journal of Construction Engineering and Management, 135(1), pp. 17-23. ISSN 0733-9364

Lu, Xueqing (2021) Examining safety behaviour on construction sites using virtual reality. PhD thesis, University of New South Wales, Australia.

Luo, Z; Jiang, Y; Li, X; Wu, R and Pan, H (2026) Financing mode selection and key success factors in area comprehensive development projects based on if-multimoora. Journal of Construction Engineering and Management, 152(4): 04026032, ISSN 0733-9364

Mawdesley, M J; Al-jibouri, S H and Yang, H (2002) Genetic algorithms for construction site layout in project planning. Journal of Construction Engineering and Management, 128(5), pp. 418-426. ISSN 0733-9364

Mawdesley, M J; Askew, W H and Al-Jibouri, S H (2004) Site layout for earthworks in road projects. Engineering, Construction and Architectural Management, 11(2), pp. 83-89. ISSN 0969-9988

Min, J U (2004) Supply chain visualization through web services integration. PhD thesis, Stanford University, USA.

Mohamad Kamar, K A (2011) Critical success factors to industrialised building system contractor. PhD thesis, University of Salford, UK.

Mohammadi, P; Asgari, S; Rashidi, A and Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6): 04025052, ISSN 0733-9364

Morgan, D C (1986) Site layout and construction planning. PhD thesis, University of Nottingham, UK.

Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364

Mwelu, N; Davis, P; Ke, Y and Watundu, S (2018) Compliance within a regulatory framework in implementing public road construction projects. Construction Economics and Building, 18(4), pp. 1-23. ISSN 2204-9029

Na, L J (2014) The government as marketer of innovation. Engineering, Construction and Architectural Management, 21(5), pp. 551-570. ISSN 0969-9988

Nanayakkara, L (2012) Site layout: how it is perceived to affect productivity in public sector construction projects in Sri Lanka. PhD thesis, Oxford Brookes University, UK.

Ng, A K W and Price, A D F (2005) Assessing the impact of main contractor's site co-ordination on sub-contractors' performance in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ng, S T; Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(1), pp. 77-97. ISSN 1471-4175

Niskanen, T and Lauttalammi, J (1989) Accident risks during handling of materials at building construction sites. Construction Management and Economics, 7(4), pp. 283-301. ISSN 01446193

Ojode, L A (2000) A resource -based view of strategic alliances: Organizational capabilities, governance, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Olatunde, N A; Fidelis, I M; Awodele, I A and Adebayo, B O (2024) Stakeholders prioritization of key performance indicators on public and private tertiary educational projects in Osun State, Nigeria. International Journal of Building Pathology and Adaptation, 42(5), pp. 881-892. ISSN 2398-4708

Olimat, H.; Abudayyeh, O.; Liu, H. and Alwashah, Z. (2026) Safety performance evaluation model for off-site construction through the integration of key leading and lagging factors. Journal of Construction Engineering and Management, 152(6): 04026077, ISSN 0733-9364

Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Oyediran, H (2025) Robot-integrated 4D building information modeling (4D BIM): Framework for planning safe autonomous construction operations in dynamic environments. PhD thesis, University of Nebraska - Lincoln, USA.

O’Connor, J T (1985) Impacts of constructability improvement. Journal of Construction Engineering and Management, 111(4), pp. 404-410. ISSN 0733-9364

O’connor, J T and Caraway, P H (1993) Need for specification format that accommodates engineered projects. Journal of Construction Engineering and Management, 119(4), pp. 757-768. ISSN 0733-9364

Pellegrino, R and Costantino, N (2018) An empirical investigation of the learning effect in concrete operations. Engineering, Construction and Architectural Management, 25(3), pp. 342-357. ISSN 0969-9988

Perera, S (1983) Resource sharing in linear construction. Journal of Construction Engineering and Management, 109(1), pp. 102-111. ISSN 0733-9364

Perera, S; Senaratne, S; Rodrigo, M N N and Brady, L (2021) Analysis of embodied carbon and cost profiles of school buildings in Australia. Built Environment Project and Asset Management, 11(4), pp. 660-672. ISSN 2044-124X

Pheng, L S and Hui, M S (1999) The application of JIT philosophy to construction: A case study in site layout. Construction Management and Economics, 17(5), pp. 657-668. ISSN 01446193

Phua, F T T (2017) Does the built-environment industry attract risk-taking individuals? Construction Management and Economics, 35(4), pp. 207-217. ISSN 01446193

Pourrahimian, E; Salhab, D; Hamzeh, F and Abourizk, S (2024) The need for a multidimensional project control perspective. Journal of Construction Engineering and Management, 150(12): 04024169, ISSN 0733-9364

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193

Purushothaman, M B and Seadon, J (2024) System-wide construction waste and their connectivity to construction phases, impacting 5m factors and effects: A systematic review. Smart and Sustainable Built Environment, 13(2), pp. 354-369. ISSN 2046-6099

Rathnayake, I; Ochoa, J J; Gu, N; Rameezdeen, R; Statsenko, L and Sandhu, S (2024) Building the future: Fostering circularity through the new dawn of sharing economy practices in the construction industry. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Ratnasabapathy, S; Alashwal, A and Perera, S (2021) Exploring the barriers for implementing waste trading practices in the construction industry in Australia. Built Environment Project and Asset Management, 11(4), pp. 559-576. ISSN 2044-124X

Rawlinson, F and Farrell, P (2009) The vision of zero risk tolerance in craft workers and operatives: An unattainable goal? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

RazaviAlavi, S and AbouRizk, S (2022) A simulation-based decision support tool for integrating site layout and construction planning of tunneling projects. Journal of Engineering, Design and Technology, 20(4), pp. 866-886. ISSN 1726-0531

Riley, D R and Sanvido, V E (1997) Space planning method for multistory building construction. Journal of Construction Engineering and Management, 123(2), pp. 171-180. ISSN 0733-9364

Rodriguez-Ramos, W E (1982) Quantitative techniques for construction site layout planning. PhD thesis, University of Florida, USA.

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Rustom, R N and Amer, M I (2006) Modeling the factors affecting quality in building construction projects in Gaza Strip. Journal of Construction Research, 7(1), pp. 33-47. ISSN 1609-9451

Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.

Sadeghpour, F; Moselhi, O and Alkass, S T (2006) Computer-aided site layout planning. Journal of Construction Engineering and Management, 132(2), pp. 143-151. ISSN 0733-9364

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364

Salari, M; Ghanbari, M; Skitmore, M and Alipour, M (2026) Developing a framework for selecting alternative materials for construction projects using BIM and the particle swarm optimization algorithm. Construction Innovation, 26(3), pp. 745-767. ISSN 1471-4175

Samuels, A F and Bruder, M J (1996) Construction representative: Scheduling and cost management. Journal of Construction Engineering and Management, 122(3), pp. 281-290. ISSN 0733-9364

San Cristóbal, J R (2009) Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), pp. 1271-1274. ISSN 0733-9364

Sanad, H M; Ammar, M A and Ibrahim, M E (2008) Optimal construction site layout considering safety and environmental aspects. Journal of Construction Engineering and Management, 134(7), pp. 536-544. ISSN 0733-9364

Schuldt, S and El-Rayes, K (2018) Optimizing the planning of remote construction sites to minimize facility destruction from explosive attacks. Journal of Construction Engineering and Management, 144(5): 04018020, ISSN 0733-9364

Scott, J R (2004) Optimising the relationship between passive solar design of new housing and the economics of construction and land value. PhD thesis, Robert Gordon University, UK.

Scott, J R; Edge, M; Laing, R and Martin, P (2004) Optimising the relationship between passive solar design of new housing and the economics of construction and land value. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Senior, B A (1995) Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 397-403. ISSN 0733-9364

Senior, B A and Halpin, D W (1998) Simplified simulation system for construction projects. Journal of Construction Engineering and Management, 124(1), pp. 72-81. ISSN 0733-9364

Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.

Senouci, A and El-Rayes, K (2009) Time-profit trade-off analysis for construction projects. Journal of Construction Engineering and Management, 135(8), pp. 718-725. ISSN 0733-9364

Shahtaheri, M; Nasir, H and Haas, C T (2015) Setting baseline rates for on-site work categories in the construction industry. Journal of Construction Engineering and Management, 141(5): 04014097, ISSN 0733-9364

Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.

Sing, M C P; Fung, I W H; Edwards, D J and Liu, H (2022) Dynamic construction site layout planning: An application of branch and bond algorithm. International Journal of Building Pathology and Adaptation, 40(4), pp. 523-538. ISSN 23984708

Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.

Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.

Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364

Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193

Soltani, A R (2004) A multi-objective intelligent transportation system in construction sites. PhD thesis, University of Salford, UK.

Soltani, A R (2005) An intelligent transportation system in construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Soltanmohammadlou, N.; Hon, C. K. H.; Drogemuller, R.; Sheikhkhoshkar, M. and Rahimian, F. (2026) An advanced exploration of technological functionalities addressing risk factors in earthmoving equipment operation on construction sites: A systematic literature review. Smart and Sustainable Built Environment, 15(5), pp. 1846-1876. ISSN 2046-6099

Spillane, J and Oyedele, L (2013) Strategies for effective management of health and safety in confined site construction. Construction Economics and Building, 13(4), pp. 50-64. ISSN 2204-9029

Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations. PhD thesis, University of Michigan, USA.

Stukhart, G (1987) Construction management responsibilities during design. Journal of Construction Engineering and Management, 113(1), pp. 90-98. ISSN 0733-9364

Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.

Su, Y-Y (2010) Construction crew productivity monitoring supported by location awareness technologies. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Sulaiman, M J (1997) Intesite: Intelligent site layout planning within an object-oriented integrated construction environment. PhD thesis, University of Salford, UK.

Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(2), pp. 267-284. ISSN 0969-9988

Taghaddos, H; Heydari, M H and Asgari, A H (2021) A hybrid simulation approach for site layout planning in construction projects. Construction Innovation, 21(3), pp. 417-440. ISSN 1471-4175

Tam, C M and Tong, T K L (2003) GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction. Construction Management and Economics, 21(3), pp. 257-266. ISSN 01446193

Tam, C M; Tong, T K L and Chan, W K W (2001) Genetic algorithm for optimizing supply locations around tower crane. Journal of Construction Engineering and Management, 127(4), pp. 315-320. ISSN 0733-9364

Tatari, A (2023) Simulating cost risks for prefabricated construction in developing countries using Bayesian networks. Journal of Construction Engineering and Management, 149(6): 04023037, ISSN 0733-9364

Teerajetgul, W and Charoenngam, C (2006) Factors inducing knowledge creation: Empirical evidence from Thai construction projects. Engineering, Construction and Architectural Management, 13(6), pp. 584-599. ISSN 0969-9988

Teng, Y; Li, Z; Cai, J and Ju, M (2023) Sustainability evaluation of the prefabricated medical emergency buildings' renovation scheme after the COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3390-3415. ISSN 0969-9988

Tetik, M; Peltokorpi, A; Seppänen, O; Leväniemi, M and Holmström, J (2021) Kitting logistics solution for improving on-site work performance in construction projects. Journal of Construction Engineering and Management, 147(1): 05020020, ISSN 0733-9364

Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364

Thunberg, M (2016) Developing a framework for supply chain planning in construction. PhD thesis, Linköping University, Sweden.

Thunberg, M; Fredriksson, A; Danielsson, J; Hyll, H; Sandberg, E and Westin, A (2017) Planning in construction: How are the different planning processes linked? In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364

Tommelein, I D (1989) SightPlan: an expert system that models and augments human decision making for designing construction site layouts. PhD thesis, Stanford University, USA.

Tommelein, I D (2020) Design science research in construction management: Multi-disciplinary collaboration on the SightPlan system. Construction Management and Economics, 38(4), pp. 340-354. ISSN 01446193

Tommelein, I D; Levitt, R E and Hayes-Roth, B (1992) Sightplan model for site layout. Journal of Construction Engineering and Management, 118(4), pp. 749-766. ISSN 0733-9364

Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Tran, D H; Tran, K N and Nguyen, N H (2025) A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management. International Journal of Construction Management, 25(10), pp. 1141-1153. ISSN 1562-3599

Tseladikae, T.; Agumba, J.; Ochieng, G.; Adebowale, O. J. and Edwards, D. (2026) Correlation analysis of project management practices and performance outcomes in social housing projects. International Journal of Construction Management, 26(10), pp. 2085-2100. ISSN 1562-3599

Varghese, K (1992) Automated route planning for large vehicles on industrial construction sites. PhD thesis, University of Texas at Austin, USA.

Victar, H C and Waidyasekara, A S (2025) Optimising construction waste management in Sri Lanka through Circular economy strategies: A focus on construction and renovation and use and operate stages. Engineering, Construction and Architectural Management, 32(7), pp. 4275-4309. ISSN 0969-9988

Wefki, H; Salah, M; Elbeltagi, E; Elsheikh, A and Khallaf, R (2025) A generative design-based optimization model for multi-objective construction site layout planning. Engineering, Construction and Architectural Management, 32(8), pp. 5429-5455. ISSN 0969-9988

White, T G (1975) Ergonomic analysis of human factors affecting optimum performance of mobile crane drivers. PhD thesis, University of Surrey, UK.

Wong, S S Y (2018) A review on the execution method for building information modelling projects in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(3), pp. 100-110. ISSN 17514304

Woolery, J C (1994) Developing specifications for cellular-telephone base stations. Journal of Construction Engineering and Management, 120(3), pp. 593-602. ISSN 0733-9364

Wu, P (2011) Application of the lean philosophy to reduce carbon emissions in the precast concrete industry of Singapore. PhD thesis, National University of Singapore, Singapore.

Wu, P; Feng, Y and Zhong, Y (2012) Identification and reduction of non-value adding activities in the precast concrete construction projects in Singapore. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Xiao, Bo (2021) Deep learning-based framework of summarizing construction videos for vision-based monitoring of construction sites. PhD thesis, University of Alberta, Canada.

Xie, H; Abourizk, S and Zou, J (2012) Quantitative method for updating cost contingency throughout project execution. Journal of Construction Engineering and Management, 138(6), pp. 759-766. ISSN 0733-9364

Yang, J (2001) A decision support system for material routing in construction sites. PhD thesis, University of Wolverhampton, UK.

Yao, Z; Zhang, L; Hua, Z and Luo, C (2025) Low-carbon multiobjective optimization for repetitive projects based on crew-based scheduling strategy. Journal of Construction Engineering and Management, 151(1): 04024183, ISSN 0733-9364

Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364

Zhang, L (2012) Ontology-based web services framework for building information modeling. PhD thesis, University of Florida, USA.

Zhang, L; Zou, X and Kan, Z (2014) Improved strategy for resource allocation in repetitive projects considering the learning effect. Journal of Construction Engineering and Management, 140(11): 4014053, ISSN 0733-9364

Zhao, Y; Jing, H; Yu, M and Li, J (2025) Efficient project management of historical building groups: a BIM-based approach with critical chain method and 5D simulation. International Journal of Construction Management, 25(7), pp. 826-839. ISSN 1562-3599

Zouein, P P and Tommelein, I D (2001) Improvement algorithm for limited space scheduling. Journal of Construction Engineering and Management, 127(2), pp. 116-124. ISSN 0733-9364

Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology. PhD thesis, North Carolina State University, USA.

Zuo, F; Zio, E and Yuan, Y (2022) Risk-response strategy optimization considering limited risk-related resource allocation and scheduling. Journal of Construction Engineering and Management, 148(11): 04022123, ISSN 0733-9364

Zuofa, T; Ochieng, E G and Ode-Ichakpa, I (2023) An evaluation of determinants influencing the adoption of circular economy principles in Nigerian construction SMEs. Building Research & Information, 51(1), pp. 69-84. ISSN 0961-3218

This list was generated on Sat Aug 22 02:33:44 2026 UTC.