Items with Subject: scope management
Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364
Abdelghafar, A (2024) Identifying challenges, best practices, and potential solutions to NYCSCA project delays. DBA thesis, Touro University Worldwide, USA.
Aboushiwa, M A A (2000) Promoter briefing on the procurement and selection of contract strategy offering the best value for money. PhD thesis, University of Manchester, UK.
Agapiou, A (2022) Briefing: The role of the technology and construction court in alternative dispute resolution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 61-64. ISSN 1751-4304
Ahiaga-Dagbui, D and Smith, S D (2012) Neural networks for modelling the final target cost of water projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ahiaga-Dagbui, D; Smith, S D; Love, P E D and Ackermann, F (2015) Spotlight on construction cost overrun research: Superficial, replicative and stagnated. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ahiaga-Dagbui D D, T O and Smith S D, W S (2013) A neuro-fuzzy hybrid model for predicting final cost of water infrastructure projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387
Ahmed, I (2020) Considerations and principles for conducting a participatory capacity and vulnerability analysis (PCVA) for disaster risk reduction and climate change adaptation. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 371-386. ISSN 1759-5916
Ajmal, M M; Khan, M; Gunasekaran, A and Helo, P T (2022) Managing project scope creep in construction industry. Engineering, Construction and Architectural Management, 29(7), pp. 2786-2809. ISSN 0969-9988
Al Juboori, A A (2021) Exploring project costs estimator practices that increase the budget estimate’s accuracy during the initial phase of construction project’s life cycle. DM thesis, Colorado Technical University, USA.
Al Zarooni, S; Abdou, A and Lewis, J (2011) Improving the client briefing for UAE public healthcare projects: Space programming guidelines. Architectural Engineering and Design Management, 7(4), pp. 251-265. ISSN 1745-2007
Al-Bizri, S and Gray, C (2014) A decision support framework for hcai risk assessment and design briefing of healthcare facilities. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599
Al-Shabbani, Z; Taherpour, F and Dadi, G B (2026) Development and short-term evaluation of a pretask safety briefing tool for highway construction and maintenance crews. Journal of Construction Engineering and Management, 152(5): 04026048, ISSN 0733-9364
Al-Shabbani, Z (2019) Improving safety performance of highway maintenance crews through pre-task safety toolbox talks. PhD thesis, University of Kentucky, USA.
Al-Yami, A M and Price, A D F (2006) A framework for implementing sustainable construction in building briefing project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Al-Yami, A M H (2008) An integrated approach to value management and sustainable construction during strategic briefing in Saudi construction projects. PhD thesis, Loughborough University, UK.
Alemu, S K (2022) Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(5), pp. 2183-2206. ISSN 0969-9988
Allahaim, Fahad Saud Abdulaziz (2015) Improving cost contingency estimation for infrastructure projects based on the impact of cost overrun causes of similar projects – illustration using Saudi Arabia survey data. PhD thesis, University of Sydney, Australia.
Alsahly, F F M (2016) Improving the management of change requests in construction of large building projects in Saudi Arabia. PhD thesis, University of Hull, UK.
Altaf, A (2022) Integrating safety, security and human factors engineering in rail infrastructure design and evaluation. PhD thesis, Bournemouth University, UK.
Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988
Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.
Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects. PhD thesis, Heriot-Watt University, UK.
Arayici, Y (2004) Requirements engineering in innovative systems developments for the construction industry. PhD thesis, University of Salford, UK.
Arayici, Y and Aouad, G (2004) Industry driven innovative systems development for the construction industry: The DIVERCITY project. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Arayici, Y and Aouad, G (2005) Computer integrated construction: An approach to requirements engineering. Engineering, Construction and Architectural Management, 12(2), pp. 194-215. ISSN 0969-9988
Arayici, Y; Aouad, G and Ahmed, V (2005) Requirements engineering for innovative integrated ICT systems for the construction industry. Construction Innovation, 5(3), pp. 179-200. ISSN 1471-4175
Bahram, D. (2025) Briefing: Importance of trust when adopting an intelligent environment. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 3-6. ISSN 1751-4304
Baldwin, A N (1982) Computer aided estimating for civil engineering contractors. PhD thesis, Loughborough University, UK.
Baldwin, A N and McCaffer, R (2000) Identifying research requirements for collaborative design. Journal of Construction Procurement, 6(1), pp. 56-66. ISSN 1358-9180
Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(2), pp. 201-215. ISSN 0969-9988
Barrie, H; McDougall, K; Miller, K and Faulkner, D (2023) The social value of public spaces in mixed-use high-rise buildings. Buildings & Cities, 4(1), pp. 669-689. ISSN 2632-6655
Belhadj, T A (1989) Computer aided architectural evaluation and design: a cost modelling experiment. PhD thesis, University of Sheffield, UK.
Bendixen, M and Koch, C (2007) Negotiating visualizations in briefing and design. Building Research & Information, 35(1), pp. 42-53. ISSN 0961-3218
Berawi, M A; Miraj, P; Arifuddin, R; Aulia, D and Rahma, S H (2022) Investigating current practice on disincentive programmes in the Indonesian construction industry. Journal of Construction in Developing Countries, 27(2), pp. 87-107. ISSN 1823-6499
Beset, D a A (2007) A model for assesing project management maturity level of architectural design offices (Arch-Pmm). PhD thesis, Izmir Institute of Technology (Turkey), Turkey.
Bishop, E (2014) The use of Department of Health standards and guidance: effects on, and benefits to, healthcare accommodation. PhD thesis, Loughborough University, UK.
Bogenstätter, U (2000) Prediction and optimization of life-cycle costs in early design. Building Research & Information, 28(5-6), pp. 376-386. ISSN 0961-3218
Bordass, B; Leaman, A and Ruyssevelt, P (2001) Assessing building performance in use 5: Conclusions and implications. Building Research & Information, 29(2), pp. 144-157. ISSN 0961-3218
Bordass, W and Leaman, A (1997) Design for manageability. Building Research & Information, 25(3), pp. 148-157. ISSN 0961-3218
Bordass, W and Leaman, A (1997) Future buildings and their services: Strategic considerations for designers and clients. Building Research & Information, 25(4), pp. 190-195. ISSN 0961-3218
Bowen, P A; Edwards, P J and Cattell, K (2009) Value management practice in South Africa: The built environment professions compared. Construction Management and Economics, 27(11), pp. 1039-1057. ISSN 1466433X
Bowen, P A; Pearl, R G and Edwards, P J (1999) Client briefing processes and procurement method selection: A South African study. Engineering, Construction and Architectural Management, 6(2), pp. 91-104. ISSN 0969-9988
Bowron, J (2002) Re-engineering the project procurement process through concurrent engineering. PhD thesis, Loughborough University, UK.
Brandon, P S and Loforte Ribeiro, F (1997) The assessment of applications for the house renovation grant system (hrgs): A multistrategy knowledge-based framework. Engineering, Construction and Architectural Management, 4(1), pp. 41-57. ISSN 0969-9988
Bresnen, M J and Haslam, C O (1991) Construction industry clients: A survey of their attributes and project management practices. Construction Management and Economics, 9(4), pp. 327-342. ISSN 01446193
Campbell, M A and Gunning, J G (2020) Strategies to improve mental health and well-being within the UK construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(2), pp. 64-74. ISSN 17514304
Carvajal-Figueroa, A (2006) The identification and measurement of the benefits of visualization technologies during the briefing process. PhD thesis, University of Reading, UK.
Castell, L (2005) Empowering the client in the briefing process. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.
Chandra, V and Loosemore, M (2008) Cultural learning during briefing: A facilities management perspective. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Chandra, V and Loosemore, M (2010) Mapping stakeholders' cultural learning in the hospital briefing process. Construction Management and Economics, 28(7), pp. 761-769. ISSN 1466433X
Chandra, V and Loosemore, M (2011) Sowing the seeds of misunderstanding in the briefing process: A case study of a new hospital project. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Chandra, V and Loosemore, M (2011) Communicating about organizational culture in the briefing process: Case study of a hospital project. Construction Management and Economics, 29(3), pp. 223-231. ISSN 1466433X
Chandra, V; Loosemore, M and McGeorge, D (2004) Cultural learning in the hospital sector: An investigation of the briefing process in strategic facilities management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Chandra, Venny (2007) An investigation of cultural learning during the hospital process from a facilities management perspective. PhD thesis, University of New South Wales, Australia.
Charkhakan, M H and Heravi, G (2023) Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(5), pp. 1932-1950. ISSN 0969-9988
Cheong, S P (2004) Functional briefing for whole life performance. PhD thesis, Loughborough University, UK.
Chinyio, E (1999) An evaluation of construction clients' needs and preferences. PhD thesis, University of Wolverhampton, UK.
Chinyio, E A; Olomolaiye, P O; Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(1), pp. 91-98. ISSN 01446193
Christensen, A N (2019) Identifying private construction project owner inefficiencies that affect project goals. PhD thesis, Iowa State University, USA.
Chung, K-H J (2010) Development of a collaborative briefing approach for infrastructure projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Collinge, W H (2011) Understanding stakeholder requirements on an NHS hospital project: Application of semiotics-rooted theories. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Collinge, W H (2014) Briefing as meaning making practice through signs: client requirement representations and transformations in construction project design. PhD thesis, University of Reading, UK.
Collinge, W H and Harty, C F (2014) Stakeholder interpretations of design: Semiotic insights into the briefing process. Construction Management and Economics, 32(7-8), pp. 760-772. ISSN 01446193
Collinge W H, H C F (2013) Evolving designs and stakeholder contributions to the briefing process. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Conradie, D C U (2001) The use of software systems to implement case-based reasoning enabled intelligent components for architectural briefing and design. SkoglDr thesis, University of Pretoria, South Africa.
Creagh, R; McGann, S; Jancey, J; Blackford, K; Tye, M; Tindall, R and Sal Moslehian, A (2025) Workplace circulation design and movement: a case study of three Australian campus buildings. Architectural Engineering and Design Management, 21(4), pp. 665-680. ISSN 1745-2007
Damoah, I S (2015) An investigation into the causes and effects of project failure in government projects in developing countries: Ghana as a case study. PhD thesis, Liverpool John Moores University, UK.
Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.
Demirel, H Ç; Leendertse, W; Volker, L and Hertogh, M (2017) Flexibility in PPP contracts: Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), pp. 196-206. ISSN 0144-6193
Distefano, M J and O'Brien, W J (2009) Comparative analysis of infrastructure assessment methodologies at the small unit level. Journal of Construction Engineering and Management, 135(2), pp. 96-107. ISSN 0733-9364
Diyagama, D; Victar, H C; Waidyasekara, A S and Rameezdeen, R (2024) Managing external stakeholders influences in mega construction projects. International Journal of Construction Management, 24(8), pp. 809-819. ISSN 1562-3599
Do, Q; Le, T; Trinh, M T and Le, C (2025) Multiobjective project clustering optimization for enhancing highway contract bundling decisions. Journal of Construction Engineering and Management, 151(11): 04025166, ISSN 0733-9364
Doloi, H (2010) Benchmarking a new design management system using process simulation approach. Construction Innovation, 10(1), pp. 42-59. ISSN 1471-4175
Domingo, N; Osmani, M and Price, A D F (2009) Construction waste minimisation in the UK healthcare industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Eaton, J R (1998) Architectural project briefing: A study of discovery, innovation and architectural problem statement. PhD thesis, University of Nottingham, UK.
El Reifi, M H (2016) A novel lean briefing process for effective design management. PhD thesis, Loughborough University, UK.
El. Reifi, M H and Emmitt, S (2013) Perceptions of lean design management. Architectural Engineering and Design Management, 9(3), pp. 195-208. ISSN 1745-2007
ElAlem, M A; Mahdi, I M; Mohamadien, H A and Hosny, S (2025) Forecasting scope creep in Egyptian construction projects: An evaluation using artificial neural network (ANN) and random forest models. International Journal of Construction Management, 25(16), pp. 2082-2101. ISSN 1562-3599
Eldin, N and Hikle, V (2003) Pilot study of quality function deployment in construction projects. Journal of Construction Engineering and Management, 129(3), pp. 314-329. ISSN 0733-9364
Elf, M; Svedbo Engström, M and Wijk, H (2012) An assessment of briefs used for designing healthcare environments: A survey in Sweden. Construction Management and Economics, 30(10), pp. 835-844. ISSN 1466433X
Elhag, T; Eapen, S and Ballal, T (2020) Moderating claims and disputes through collaborative procurement. Construction Innovation, 20(1), pp. 79-95. ISSN 1471-4175
Emmanuel, R (2021) Urban microclimate in temperate climates: A summary for practitioners. Buildings & Cities, 2(1), pp. 402-410. ISSN 2632-6655
Emmitt, S; Christoffersen, A K and Sander, D (2004) Design management: A value based approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Enshassi, A (1996) Materials control and waste on building sites. Building Research & Information, 24(1), pp. 31-34. ISSN 0961-3218
Fageha, M K and Aibinu, A A (2014) Prioritising project scope definition elements in public building projects. Construction Economics and Building, 14(3), pp. 18-33. ISSN 2204-9029
Fageha, M K and Aibinu, A A (2016) Identifying stakeholders' involvement that enhances project scope definition completeness in Saudi Arabian public building projects. Built Environment Project and Asset Management, 6(1), pp. 6-29. ISSN 2044-124X
Fageha, Mohammed Kamal (2014) Managing stakeholders' participation to improve project scope definition completeness and enhance project outcome. PhD thesis, University of Melbourne, Australia.
Fakilede, J (2020) Strategies utility business organizations use to deliver construction projects on-budget and on-schedule. PhD thesis, Walden University, USA.
Fawcett, W and Song, J Y (2009) Modelling the use of space and time in the knowledge economy. Building Research & Information, 37(3), pp. 312-324. ISSN 0961-3218
Fu, Y (2019) Organizational governance and value creation: An empirical study in megaproject contexts. PhD thesis, University of Manchester, UK.
Gameson, R; Suresh, S and Chinyio, E (2008) Project debriefing: A multi-domain review of practices and procedures. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Garrett, C C (1991) Roadway infrastructure management and investment behavior studies for developing countries: A multicriteria approach to road improvement decision-making. PhD thesis, Ohio State University, USA.
Gashaw, T and Jilcha, K (2023) Design risk modeling and analysis for railway construction projects. International Journal of Construction Management, 23(14), pp. 2488-2498. ISSN 1562-3599
Gheisari, M; Irizarry, J and Horn, D B (2010) Situation awareness approach to construction safety management improvement. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Ghosh, A (2017) Briefing: Recent developments in construction and engineering insurance law. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 3-5. ISSN 1751-4304
Gibson Jr, G E and Gebken Ii, R J (2003) Design quality in pre-project planning: Applications of the project definition rating index. Building Research & Information, 31(5), pp. 346-356. ISSN 0961-3218
Gil, N (2022) Megaprojects: A meandering journey towards a theory of purpose, value creation and value distribution. Construction Management and Economics, 40(7-8), pp. 562-584. ISSN 01446193
Godawatte, G A G R (2021) Understanding the cost overrun causation in construction megaprojects: a grounded systems thinking approach. PhD thesis, Heriot-Watt University, UK.
Gormley-Gallagher, A.; Amezaga, J.; Shucksmith, J.; Savic, D.; Templeton, M.; McAdam, E. and Jeffrey, P. (2015) Briefing: Negotiating value at the research-practice interface in the water sector. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(1), pp. 8-11. ISSN 1751-4304
Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.
Green, S D (1996) A metaphorical analysis of client organizations and the briefing process. Construction Management and Economics, 14(2), pp. 155-164. ISSN 01446193
Green, S D (1996) SMART value management: a group decision support methodology for building design. PhD thesis, University of Reading, UK.
Green, S D (1999) A participative research strategy for propagating soft methodologies in value management practice. Construction Management and Economics, 17(3), pp. 329-340. ISSN 01446193
Green, S D and Simister, S J (1999) Modelling client business processes as an aid to strategic briefing. Construction Management and Economics, 17(1), pp. 63-76. ISSN 01446193
Gruneberg, S L; Hughes, W P and Ancell, D J (2007) Risk under performance-based contracting in the UK construction sector. Construction Management and Economics, 25(7), pp. 691-699. ISSN 1466433X
Günhan, S and Arditi, D (2007) Budgeting owner's construction contingency. Journal of Construction Engineering and Management, 133(7), pp. 492-497. ISSN 0733-9364
Habib, M and Spang, K (2014) Alternative project delivery systems for transport infrastructure in Germany. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Hairstans, R and Smith, R E (2018) Offsite hub (Scotland): Establishing a collaborative regional framework for knowledge exchange in the UK. Architectural Engineering and Design Management, 14(1-2), pp. 60-77. ISSN 1745-2007
Hallowell, M (2010) Cost-effectiveness of construction safety programme elements. Construction Management and Economics, 28(1), pp. 25-34. ISSN 1466433X
Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(5), pp. 379-386. ISSN 0961-3218
Hardwicke, J and King, A (2014) The use of evidence based design in NHS construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.
Hassanain, M A; Bin-Mohanna, A; Al-Hammad, A-M and Sanni-Anibire, M O (2017) Challenges to the implementation of building management systems in Saudi Arabia. Built Environment Project and Asset Management, 7(2), pp. 130-142. ISSN 2044-124X
Henry Duncan John, M; Amoah, C and Ayesu-Koranteng, E (2022) Causes of road projects' delays: A case of blantyre, Malawi. Built Environment Project and Asset Management, 12(2), pp. 293-308. ISSN 2044-124X
Hewage, K N (2007) Construction productivity improvement by worker motivation and it based communication. PhD thesis, University of Calgary, Canada.
Hilali, A; Charoenngam, C and Barman, A (2019) Barriers in contractual scope management of international development projects in Afghanistan. Engineering, Construction and Architectural Management, 26(8), pp. 1574-1592. ISSN 0969-9988
Hill, C (2009) Re-evaluating the placement experience of built environment undergraduates. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Hogg, K (2000) The impact of information sequence in the construction domain. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hunter, K and Kelly, J (2004) Value management workshops and partnering conundrums. Journal of Construction Procurement, 10(1),
Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364
Ilter, D (2012) Identification of the relations between dispute factors and dispute categories in construction projects. International Journal of Law in the Built Environment, 4(1), pp. 45-59. ISSN 1756-1450
Irizarry, J and Gheisari, M (2013) Situation awareness (SA), a qualitative user-centered information needs assessment approach. International Journal of Construction Management, 13(3), pp. 35-53. ISSN 1562-3599
Iromuanya, C (2013) A qualitative study on construction project success factors in dynamic project environments: A Delphi approach. PhD thesis, Capella University, USA.
Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.
Jadhav, Ajay (2023) Development of scope of services for procurement of professional consultant services on transportation projects: A study of South carolina department of transportation. PhD thesis, Clemson University, USA.
Jawad, S; Ledwith, A and Khan, R (2022) Project control system (PCS) implementation in engineering and construction projects: An empirical study in Saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 31(13), pp. 181-207. ISSN 0969-9988
Jeffrey, J H (2010) Recurrent problems in the construction process: an action research study of the design and construction quality of hospital en-suites. PhD thesis, University of Salford, UK.
Jensen, P A (2011) Inclusive briefing and user involvement: Case study of a media centre in Denmark. Architectural Engineering and Design Management, 7(1), pp. 38-49. ISSN 1745-2007
Jensen, P A (2012) Knowledge transfer from facilities management to building projects: A typology of transfer mechanisms. Architectural Engineering and Design Management, 8(3), pp. 170-179. ISSN 1745-2007
Ji, S H; Park, M and Lee, H S (2010) Data preprocessing-based parametric cost model for building projects: Case studies of Korean construction projects. Journal of Construction Engineering and Management, 136(8), pp. 844-853. ISSN 0733-9364
Johannes, K; Voordijk, H and Aranda-Mena, G (2023) The role of purchasing in raising the maturity of smart maintenance management. Built Environment Project and Asset Management, 13(2), pp. 324-340. ISSN 2044-124X
Johansen, E and Carson, J (2003) Improving the effectiveness of the building design management process in the UK. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Josephson, P E and Chao, M (2014) Use and non-use of time in construction of new multi-dwelling buildings in Sweden. International Journal of Construction Management, 14(1), pp. 28-35. ISSN 1562-3599
Kalasapudi, V S (2017) Automatic change-based diagnosis of structures using spatiotemporal data and as-designed model. PhD thesis, Arizona State University, USA.
Kamara, J M (2017) Maintaining focus on clients' requirements using the DQI tool: Towards a requirements-oriented project process. Built Environment Project and Asset Management, 7(3), pp. 271-283. ISSN 2044-124X
Kamara, J M; Anumba, C J and Hobbs, B (1999) From briefing to client requirements processing. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Kao, C-C (2004) The briefing process: an organizational knowledge-creation perspective. PhD thesis, University of Reading, UK.
Karimidorabati, S; Haas, C T and Gray, J (2016) Evaluation of automation levels for construction change management. Engineering, Construction and Architectural Management, 23(5), pp. 554-570. ISSN 0969-9988
Kartam, N A (1999) Design/construction integration: Issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(3), pp. 299-314. ISSN 0969-9988
Keeter, E H (1985) The development of a task inventory for baccalaureate programs in construction management (education, curriculum). PhD thesis, Texas A&M University, USA.
Kelly, J; Male, S and Gronqvist, M (2000) Characteristics of refurbishing retailers as clients of the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Kelly, J R (2005) Managing client value at the strategic briefing stage of construction projects. PhD thesis, Heriot-Watt University, UK.
Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988
Kissi, E; Agyekum, K; Baiden, B K; Tannor, R A; Asamoah, G E and Andam, E T (2019) Impact of project monitoring and evaluation practices on construction project success criteria in Ghana. Built Environment Project and Asset Management, 9(3), pp. 364-382. ISSN 2044-124X
Kiziltas, S and Akinci, B (2009) Contextual information requirements of cost estimators from past construction projects. Journal of Construction Engineering and Management, 135(9), pp. 841-852. ISSN 0733-9364
Knight, K and Fayek, A R (2002) Use of fuzzy logic for predicting design cost overruns on building projects. Journal of Construction Engineering and Management, 128(6), pp. 503-512. ISSN 0733-9364
Koc, K and Gurgun, A P (2022) Ambiguity factors in construction contracts entailing conflicts. Engineering, Construction and Architectural Management, 29(5), pp. 1946-1964. ISSN 0969-9988
Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029
Kulczak-Dawkins, R P (2021) Managing sustainability through architectural design decision processes: influences of values and frames. PhD thesis, University of Brighton, UK.
Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(1), pp. 17-29. ISSN 01446193
Lahdenperä, P (2010) Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), pp. 783-796. ISSN 1466433X
Lam, P T I; Kumaraswamy, M M and Ng, S T (2004) The use of construction specifications in Singapore. Construction Management and Economics, 22(10), pp. 1067-1079. ISSN 01446193
Lama, Supreet (2023) Improving design briefing with BIM-based concept generation aiming to enhance building project performance. PhD thesis, University of West London, UK.
Laryea, S and Watermeyer, R (2020) Managing uncertainty in fast-track construction projects: Case study from South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(2), pp. 49-63. ISSN 17514304
Laurell-Stenlund, K (2010) Value creation in development and construction of public buildings: The case of houses of culture. PhD thesis, Luleå University of Technology, Sweden.
Laurell-Stenlund, K and Eriksson, P E (2010) Design factors' influence on value creation when building houses of culture. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Lawal, H S; Ahmadu, H A; Abdullahi, M; Yamusa, M A and Abdulrazaq, M (2023) Modeling duration of building renovation projects. Journal of Financial Management of Property and Construction, 28(3), pp. 423-438. ISSN 1366-4387
Le, T; Caldas, C H; Gibson, G E and Thole, M (2009) Assessing scope and managing risk in the highway project development process. Journal of Construction Engineering and Management, 135(9), pp. 900-910. ISSN 0733-9364
Lee, C C T and Egbu, C (2005) Capturing client needs in refurbishment projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Lee, Z P; Rahman, R A and Doh, S I (2022) Application of decision support tool in design-build projects: A quasi-experiment with novice decision makers. Built Environment Project and Asset Management, 12(4), pp. 537-555. ISSN 2044-124X
Lei, Z; Han, S; Bouferguène, A; Taghaddos, H; Hermann, U and Al-Hussein, M (2015) Algorithm for mobile crane walking path planning in congested industrial plants. Journal of Construction Engineering and Management, 141(2): 05014016, ISSN 0733-9364
Leo-Olagbaye, F and Odeyinka, H A (2020) An assessment of risk impact on road projects in Osun State, Nigeria. Built Environment Project and Asset Management, 10(5), pp. 673-691. ISSN 2044-124X
Leslie-Carter, R; Zou, P X W and Tan, E X (2009) Managing international projects: A case study of the water cube aquatic centre for Beijing 2008 olympic games. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Leu, S S and Lin, Y C (2008) Project performance evaluation based on statistical process control techniques. Journal of Construction Engineering and Management, 134(10), pp. 813-819. ISSN 0733-9364
Leung, M Y; Chen, D and Yu, J (2008) Demystifying moderate variables of the interrelationships among affective commitment, job performance, and job satisfaction of construction professionals. Journal of Construction Engineering and Management, 134(12), pp. 963-971. ISSN 0733-9364
Li, J; Wang, H; Xie, Y and Zeng, W (2020) Human error identification and analysis for shield machine operation using an adapted tracer method. Journal of Construction Engineering and Management, 146(8): 04020095, ISSN 0733-9364
Li, J; Yu, M and Wang, H (2018) A taxonomy of performance shaping factors for shield tunnel construction. Engineering, Construction and Architectural Management, 25(4), pp. 574-596. ISSN 0969-9988
Lines, B C; Sullivan, K T and Wiezel, A (2016) Support for organizational change: Change-readiness outcomes among AEC project teams. Journal of Construction Engineering and Management, 142(2): 04015062, ISSN 0733-9364
Ling, F Y Y; Low, S P; Wang, S and Egbelakin, T (2008) Models for predicting project performance in China using project management practices adopted by foreign AEC firms. Journal of Construction Engineering and Management, 134(12), pp. 983-990. ISSN 0733-9364
Lomas, K J (2021) Summertime overheating in dwellings in temperate climates. Buildings & Cities, 2(1), pp. 487-494. ISSN 2632-6655
Loosemore, M; Braham, R; Yiming, Y and Bronkhorst, C (2020) Relational determinants of construction project outcomes: A social network perspective. Construction Management and Economics, 38(11), pp. 1061-1076. ISSN 01446193
Loosemore, M and Chandra, V (2012) Learning through briefing: For strategic facilities management in the health sector. Built Environment Project and Asset Management, 2(1), pp. 103-117. ISSN 2044-124X
Love, P; Davis, P; Ellis, J and Cheung, S O (2010) Dispute causation: Identification of pathogenic influences in construction. Engineering, Construction and Architectural Management, 17(4), pp. 404-423. ISSN 0969-9988
Love, P E D; Davis, P; Kerry London, K and Jasper, T (2008) Causal modelling of construction disputes. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Love, P E D; Tse, R Y C and Edwards, D J (2005) Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management, 131(2), pp. 187-194. ISSN 0733-9364
Lukhele, T; Botha, B and Mbanga, S (2021) Exploring project complexity relations to scope changes in construction projects: A case study of NEC projects in South Africa. Construction Economics and Building, 21(2), pp. 18-33. ISSN 2204-9029
Luo, X (2011) A knowledge-based electronic meeting system for implementing value management in construction briefing. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Luong, D L; Tran, D H and Nguyen, P T (2021) Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. International Journal of Construction Management, 21(3), pp. 271-283. ISSN 1562-3599
Mahamid, I (2022) Impact of rework on material waste in building construction projects. International Journal of Construction Management, 22(8), pp. 1500-1507. ISSN 1562-3599
Mahmud, A T (2021) Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling. PhD thesis, Heriot-Watt University, UK.
Mahmud, A T; Ogunlana, S O and Hong, W T (2021) Key driving factors of cost overrun in highway infrastructure projects in Nigeria: A context-based perspective. Journal of Engineering, Design and Technology, 19(6), pp. 1530-1555. ISSN 1726-0531
Marchant, David (2015) Capturing and integrating the design brief in building information models. PhD thesis, University of New South Wales, Australia.
Martin, H; James, J and Chadee, A (2025) Exploring large language model AI tools in construction project risk assessment: ChatGPT limitations in risk identification, mitigation strategies, and user experience. Journal of Construction Engineering and Management, 151(9): 04025119, ISSN 0733-9364
Massyn, M and Lamont, S (2009) Applying the briefing process on the people s housing process projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Matsumoto, I T; Stapleton, J; Glass, J and Thorpe, T (2005) Use of process maps to develop a management briefing sheet for a design consultancy. Engineering, Construction and Architectural Management, 12(5), pp. 458-469. ISSN 0969-9988
Memon, F A (2023) Stakeholder engagement in managing scope change during the execution phase of UK construction projects. PhD thesis, University of Bedfordshire, UK.
Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings. PhD thesis, Heriot-Watt University, UK.
Mitropoulos, P and Sanchez, R (2016) Criteria and considerations for project work structuring. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 124-130. ISSN 17514304
Mohammed, A; Bahatheq, A; Ghaithan, A; Alshibani, A; Mazher, K M and Alrashidi, A (2026) Predicting schedule delays of construction projects in the oil and gas industry: Comparative study. Built Environment Project and Asset Management, 16(2), pp. 286-303. ISSN 2044-124X
Mokhtar, A N S; Wilkinson, S and Fassman, E (2015) Strategies for improving energy saving behaviour in commercial buildings in Malaysia. Engineering, Construction and Architectural Management, 22(1), pp. 73-90. ISSN 0969-9988
Molenaar, K; Washington, S and Diekmann, J (2000) Structural equation model of construction contract dispute potential. Journal of Construction Engineering and Management, 126(4), pp. 268-276. ISSN 0733-9364
Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Moussa, M; Ruwanpura, J and Jergeas, G (2007) CTAN for risk assessments using multilevel stochastic networks. Journal of Construction Engineering and Management, 133(1), pp. 96-101. ISSN 0733-9364
Nanayakkara, L (1999) An interpretive research methodology for assessing the appicability of western productivity techniques in Sri Lanka. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Navendren, D.; Manu, P.; Mahamadu, A. M.; Shelbourn, M. and Wildin, K. (2014) Briefing: Towards exploring profession-specific BIM challenges in the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), pp. 163-166. ISSN 1751-4304
Nuruddin, A R; Abu Bakar, S P S and Jaafar, M (2015) Unveiling the challenges faced by Malaysian housing developers through government policy changes. Journal of Construction in Developing Countries, 20(2), pp. 37-52. ISSN 1823-6499
Ogbeifun, E; Mbohwa, C and Pretorius, J H C (2018) Developing an effective renovation plan: The influence of data collection tools. International Journal of Building Pathology and Adaptation, 36(1), pp. 63-76. ISSN 23984708
Ojelabi, R A; Oyeyipo, O O; Afolabi, A O and Omuh, I O (2022) Evaluating barriers inhibiting investors participation in public-private partnership project bidding process using structural equation model. International Journal of Construction Management, 22(16), pp. 3055-3064. ISSN 1562-3599
Okello, J F; Bowa, O and Migosi, J (2025) The role of project delivery methods on the execution of construction projects in the Kenyan judiciary. Construction Economics and Building, 25(1), pp. 49-68. ISSN 2204-9029
Okoli, J. (2020) Expert knowledge elicitation in the firefighting domain and the implications for training novices. International Journal of Disaster Resilience in the Built Environment, 11(4), pp. 577-578. ISSN 1759-5908
Olatokun, E O (2017) Requirement elicitation using knowledge capturing (kc) techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.
Olatokun, E O (2017) Requirement elicitation using knowledge capturing techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.
Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry. PhD thesis, North Carolina State University, USA.
Ortega Quintana, S A (2024) Relationship between project manager’s emotional intelligence and their performance: A quantitative correlational study. DBA thesis, University of Phoenix, USA.
Oswald, T H (1995) A model for using quality function deployment in engineering project development. PhD thesis, Clemson University, USA.
Othman, A A E and Saad, A S M (2026) A strategy for reducing construction waste generated during the design process in architectural design firms in Egypt. Construction Innovation, 26(2), pp. 395-420. ISSN 1471-4175
Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.
Palihakkara, A D and Perera, B A K S (2022) Risk management in guaranteed maximum price (gmp) contracts. Smart and Sustainable Built Environment, 11(2), pp. 368-386. ISSN 2046-6099
Park, S H (2009) Whole life performance assessment: Critical success factors. Journal of Construction Engineering and Management, 135(11), pp. 1146-1161. ISSN 0733-9364
Patel, T; Guo, B H W; van der Walt, J D and Zou, Y (2025) Unmanned ground vehicle (ugv) based automated construction progress measurement of road using LSTM. Engineering, Construction and Architectural Management, 32(9), pp. 5764-5791. ISSN 0969-9988
Perera, B A K S; Sirimewan, D C and Senadeera, A D (2021) Management of variations in the public-sector building construction projects in Sri Lanka. Journal of Engineering, Design and Technology, 19(6), pp. 1601-1619. ISSN 1726-0531
Pillajo, E; Mourgues, C and González, V A (2024) Formalizing the information requirements for decision-making of field managers during indoor construction activities. Engineering, Construction and Architectural Management, 31(10), pp. 4125-4145. ISSN 0969-9988
Platt, L S; Chen, X; Sabo-Attwood, T; Iovine, N; Brown, S and Pollitt, B (2024) Improving infection prevention briefing through predictive predesign: A computational approach to architectural programming by evaluating socioecological risk factors. Architectural Engineering and Design Management, 20(4), pp. 776-788. ISSN 1745-2007
Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029
Prince, R F A (2011) The construction briefing process: evaluating the influence of personality traits on the performance of the consultant project manager. PhD thesis, Heriot-Watt University, UK.
Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988
Rasdorf, W; Lewis, P; Arocho, I and Hummer, J (2015) Characterizing air pollutant emissions for highway construction projects. Smart and Sustainable Built Environment, 4(3), pp. 315-328. ISSN 2046-6099
Renuka, S M and Umarani, C (2019) Effect of critical risk factors causing cost deviation in medium sized construction projects. Journal of Construction in Developing Countries, 23(2), pp. 63-85. ISSN 1823-6499
Robinson, A; Gibb, A G and Austin, S A (2012) Standardisation of specification driven buildings with serial and repeat order designs. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ryd, N V (2003) Exploring construction briefing: From document to process. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.
Said, H M and Reginato, J (2018) Impact of design changes on virtual design and construction performance for electrical contractors. Journal of Construction Engineering and Management, 144(1): 04017097, ISSN 0733-9364
Sajadfar, Narges (2022) Application of machine learning to automate classification and information extraction in industrial construction documents. PhD thesis, University of Alberta, Canada.
Salama, M and Habib, A P (2009) Investigating the causes of variation within the construction projects in UAE. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Sengonzi, R (2011) A framework for achieving whole life value of healthcare facilities through briefing and optioneering. PhD thesis, Loughborough University, UK.
Shah, M N; Dixit, S; Kumar, R; Jain, R and Anand, K (2021) Causes of delays in slum reconstruction projects in India. International Journal of Construction Management, 21(5), pp. 452-467. ISSN 1562-3599
Shahrin, F and Udeaja, C (2019) Evaluation of the challenges in using building information modelling to improve client’s requirements delivery. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.
Shalwani, A and Lines, B C (2021) An empirical analysis of the causes of cost and schedule growth for small healthcare and educational construction projects. International Journal of Construction Education and Research, 17(3), pp. 277-296. ISSN 1557-8771
Shalwani, A and Lines, B C (2021) An empirical analysis of issue management in small building construction projects. International Journal of Construction Education and Research, 17(4), pp. 352-372. ISSN 1557-8771
Sharma, V; Caldas, C H and Mulva, S P (2020) Identification and prioritization of factors affecting the overall project cost of healthcare facilities. Journal of Construction Engineering and Management, 146(2): 04019106, ISSN 0733-9364
Shen, Q; Li, H; Chung, J and Hui, P Y (2004) A framework for identification and representation of client requirements in the briefing process. Construction Management and Economics, 22(2), pp. 213-221. ISSN 01446193
Shibeika, A; Davies, R and Gray, C (2009) Care pathways and the built environment: Conceptual framework for understanding. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Silva, P M; Domingo, N and Ameer Ali, N A N (2024) Causes of disputes in the construction industry: a systematic literature review. Journal of Financial Management of Property and Construction, 29(2), pp. 193-210. ISSN 1366-4387
Simushi, S and Wium, J (2020) Time and cost overruns on large projects: Understanding the root cause. Journal of Construction in Developing Countries, 25(1), pp. 129-146. ISSN 1823-6499
Singh, H; Elghaish, F and Brooks, T (2023) Automated workflows for design coordination: Supporting MEP systems. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Skitmore, M and Mills, A (1999) A needs based methodology for classifying construction clients and selecting contractors: Comment. Construction Management and Economics, 17(1), pp. 5-7. ISSN 01446193
Slater, M B (2022) A modified e-Delphi study of project scope creep in the engineering construction industry. PhD thesis, Northcentral University, USA.
Smith, J (2005) An approach to developing a performance brief at the project inception stage. Architectural Engineering and Design Management, 1(1), pp. 3-20. ISSN 1745-2007
Smith, J and Wyatt, R (1998) Criteria for strategic decision-making at the pre-briefing stage. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Smith, J and Wyatt, R (1999) Strategic needs analysis: Preliminary results. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Smith, J M; Kenley, R and Wyatt, R (1998) Evaluating the client briefing problem: An exploratory study. Engineering, Construction and Architectural Management, 5(4), pp. 387-398. ISSN 0969-9988
Smith, Jim (2002) Strategic client briefing: A model for building project inception. PhD thesis, University of Melbourne, Australia.
Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Towards an explicit design decision process: The case of the structural frame. Construction Management and Economics, 24(6), pp. 603-614. ISSN 1466433X
Solomon, T (2021) Change blindness in the construction industry. PhD thesis, George Mason University, USA.
Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.
Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364
Stenlund, K L; Ryd, N and Vennström, A (2009) Client's decisions in strategic briefs and their impact on user values. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Sterry, P and Sutrisna, M (2007) Briefing and designing performing arts buildings: Assessing the role of secondary project stakeholders. Architectural Engineering and Design Management, 3(4), pp. 209-221. ISSN 1745-2007
Swaffield, L M (1998) Improving early cost advice for mechanical and electrical services. PhD thesis, Loughborough University, UK.
Swaffield, L M and Pasquire, C L (2000) Improving early cost advice for mechanical and electrical services by considering functions and client/design team communication. Journal of Financial Management of Property and Construction, 5(1-2), pp. 3-13. ISSN 1366-4387
Symons, Anne Wood (2021) Integrated design, design management and the delivery of major hospitals. PhD thesis, University College London, UK.
Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Thabet, W and Lucas, J (2017) Asset data handover for a large educational institution: Case-study approach. Journal of Construction Engineering and Management, 143(11): 05017017, ISSN 0733-9364
Thomas, W K (2013) The impact of RFP phase project scope development on the successful outcome of construction projects using the design build project delivery method. PhD thesis, University of Alabama in Huntsville, USA.
Thomson, D (2011) A pilot study of client complexity, emergent requirements and stakeholder perceptions of project success. Construction Management and Economics, 29(1), pp. 69-82. ISSN 1466433X
Thyssen, M H; Emmitt, S; Bonke, S and Kirk-Christoffersen, A (2010) Facilitating client value creation in the conceptual design phase of construction projects: A workshop approach. Architectural Engineering and Design Management, 6(1), pp. 18-30. ISSN 1745-2007
Tryggestad, K; Hugosson, M and Søberg, P (2018) Managing risk and uncertainty in sustainable construction innovation: The role of the partnering contract. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Umar, T; Egbu, C; Honnurvali, M S; Saidani, M and Al-Bayati, A J (2019) Briefing: Status of occupational safety and health in GCC construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 137-141. ISSN 1751-4304
Umuhoza, E; Bitamba, B F and An, S H (2023) Causes and preventive strategies of scope creep for building construction projects in democratic republic of Congo and Rwanda. International Journal of Construction Management, 23(7), pp. 1264-1275. ISSN 1562-3599
Vahabi, A; Nasirzadeh, F and Mills, A (2022) Impact of project briefing clarity on construction project performance. International Journal of Construction Management, 22(13), pp. 2504-2516. ISSN 1562-3599
Vahabi, A; Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: A fuzzy hybrid simulation approach. Construction Management and Economics, 40(4), pp. 278-295. ISSN 01446193
Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988
Vahabi, Ali (2018) Investigating the impact of project scope definition on design-build project performance: A system dynamics approach. PhD thesis, Queensland University of Technology, Australia.
Vakeva-Baird, S; Tahmasebi, F; Williams, J J and Mumovic, D (2025) Effective interdisciplinary stakeholder engagement in net zero building design. Buildings & Cities, 6(1), pp. 654-673. ISSN 2632-6655
Van Amstel, F M C; Zerjav, V; Hartmann, T; Van Der Voort, M C and Dewulf, G P M R (2015) Expanding the representation of user activities. Building Research & Information, 43(2), pp. 144-159. ISSN 0961-3218
Vasserman, S (2019) Essays on industrial organization. PhD thesis, Harvard University, USA.
Vennström, A (2008) The construction client as a change agent contextual support and obstacles. PhD thesis, Luleå University of Technology, Sweden.
Vosman, L; Coenen, T B J; Volker, L and Visscher, K (2023) Collaboration and innovation beyond project boundaries: Exploring the potential of an ecosystem perspective in the infrastructure sector. Construction Management and Economics, 41(6), pp. 457-474. ISSN 01446193
Walker, D H T (1994) An investigation into factors that determine building construction time performance. PhD thesis, Royal Melbourne Institute of Technology, Australia.
Walker, D H T (1995) An investigation into construction time performance. Construction Management and Economics, 13(3), pp. 263-274. ISSN 01446193
Walker, D H T and Rahmani, F (2016) Delivering a water treatment plant project using a collaborative project procurement approach. Construction Innovation, 16(2), pp. 158-184. ISSN 1471-4175
Wanberg, J; Harper, C; Hallowell, M R and Rajendran, S (2013) Relationship between construction safety and quality performance. Journal of Construction Engineering and Management, 139(10): 04013004, ISSN 0733-9364
Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364
Wang, Y-R (2002) Applying the PDRI in project risk management. PhD thesis, University of Texas at Austin, USA.
Watson, S (2004) Improving the implementation of environmental strategies in the design of buildings: Towards a life-cycle based, front loaded, framework for building environmental assessment during design. PhD thesis, University of Queensland, Australia.
Whitaker, R (2022) The influence of end user requirements to inform built asset design. PhD thesis, Leeds Beckett University, UK.
Wilkes, J T; Nobe, M C; Clevenger, C M and Cross, J E (2015) Needs assessment: Identifying and addressing high school counselors' perceptions of construction management. International Journal of Construction Education and Research, 11(3), pp. 196-217. ISSN 1557-8771
Willis, C J (2010) Measuring the performance of the construction industry through the use of project performance benchmarking metrics in conjunction with maturity modeling. PhD thesis, University of New Brunswick, Canada.
Wilson, G and Kishk, M (2012) Key criteria of sustainable hospital refurbishment: A stakeholder review. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Windapo, A; Alade, K; Lefoka, M; Lefokotsane, K and Mundoma, T (2024) The role of construction managers' competencies in enhancing project performance. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Wu, W; Mayo, G; McCuen, T L; Issa, R R A and Smith, D K (2018) Building information modeling body of knowledge. I: Background, framework, and initial development. Journal of Construction Engineering and Management, 144(8): 04018065, ISSN 0733-9364
Xia, B; Chan, A; Molenaar, K and Skitmore, M (2012) Determining the appropriate proportion of owner-provided design in design-build contracts: Content analysis approach. Journal of Construction Engineering and Management, 138(9), pp. 1017-1022. ISSN 0733-9364
Xia, B; Molenaar, K; Chan, A; Skitmore, M and Zuo, J (2013) Determining optimal proportion of design in design-build request for proposals. Journal of Construction Engineering and Management, 139(6), pp. 620-627. ISSN 0733-9364
Xiang, L; Tan, Y; Jin, X and Shen, G (2021) Understanding stakeholders' concerns of age-friendly communities at the briefing stage: A preliminary study in urban China. Engineering, Construction and Architectural Management, 28(1), pp. 31-54. ISSN 0969-9988
Xing, J (2024) Functional reasoning support for nuclear power plant field operators. PhD thesis, Carnegie Mellon University, USA.
Yadav, S and Ray, G S (2015) Supply chain management in flyover projects in India. Journal of Construction in Developing Countries, 20(1), pp. 25-47. ISSN 1823-6499
Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708
Yu, A; Shen, Q P; Kelly, J and Hunter, K (2004) Development of a value management framework for the formation of project briefs. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Yu, A T W; Shen, Q; Kelly, J and Hunter, K (2006) Investigation of critical success factors in construction project briefing by way of content analysis. Journal of Construction Engineering and Management, 132(11), pp. 1178-1186. ISSN 0733-9364
Yu, A T W; Shen, Q; Kelly, J and Hunter, K (2008) Comparative study of the variables in construction project briefing/architectural programming. Journal of Construction Engineering and Management, 134(2), pp. 122-138. ISSN 0733-9364
Yu, A T W; Shen, Q; Kelly, J and Lin, G (2006) A value management approach to strategic briefing: An exploratory study. Architectural Engineering and Design Management, 2(4), pp. 245-259. ISSN 1745-2007
Yu, T W (2007) A value management framework for systematic identification and precise representation of client requirements in the briefing process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Yunus, R and Yang, J (2014) Improving ecological performance of industrialized building systems in Malaysia. Construction Management and Economics, 32(1-2), pp. 183-195. ISSN 01446193
Yunus, Riduan (2012) Decision making guidelines for sustainable construction of industrialised building systems. PhD thesis, Queensland University of Technology, Australia.
Yusuf, F (1997) Information and process modelling for IT implementation at the briefing stage. PhD thesis, University of Salford, UK.
Zhang, C; Zhang, W; Shi, Y; Zhao, T and Zhang, Y (2025) Digital safety navigation for tower crane climbing process from a systematic perspective: Risk identification, safety information requirements, and related intelligent platform. Journal of Construction Engineering and Management, 151(8): 04025096, ISSN 0733-9364
Zhang, S; Leiringer, R and Winch, G (2024) Procuring infrastructure public-private partnerships: Capability development and learning from an owner perspective. Construction Management and Economics, 42(1), pp. 35-53. ISSN 01446193
Zhou, W; Heesom, D; Georgakis, P and Tah, J H M (2014) User-centred design for collaborative 4D modelling. Construction Innovation, 14(4), pp. 493-517. ISSN 1471-4175
Çalışkan, E B (2022) A data-driven requirement elicitation system for pre-project stage. PhD thesis, Middle East Technical University, Turkey.