Items with Subject: resource management

Number of items: 351.

A. Mohy, A.; Bassioni, H. A.; Elgendi, E. O. and Hassan, T. M. (2026) Modeling spatiotemporal hazard dynamics for construction safety using graph attention networks. Journal of Engineering, Design and Technology, ISSN 1726-0531

Aalami, F B (1998) Using construction method models to generate four-dimensional production models. PhD thesis, Stanford University, USA.

Abdelkader, E M; Moselhi, O; Marzouk, M and Zayed, T (2021) Integrative evolutionary-based method for modeling and optimizing budget assignment of bridge maintenance priorities. Journal of Construction Engineering and Management, 147(9): 04021100, ISSN 0733-9364

Abdelmohsen, S M A (2011) An ethnographically informed analysis of design intent communication in BIM-enabled architectural practice. PhD thesis, Georgia Institute of Technology, USA.

Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.

Abdullah Sani, H. A. and Jaafar, N. I. (2026) Exploring the impact of IoT on governance and public service transformation: Evidence from malaysia's public sector. Smart and Sustainable Built Environment, 15(5), pp. 1991-2014. ISSN 2046-6099

Abu Dabous, S; Alzghoul, A and Ibrahim, F (2025) Intelligent condition prediction model for bridge infrastructure based on evaluating machine learning algorithms. Smart and Sustainable Built Environment, 14(2), pp. 557-576. ISSN 2046-6099

Abudu, H. D.; Mewomo, M. C.; Adjei, K. O. and Bondinuba, F. K. (2026) An emergency response framework for improving crisis management in facilities: PLS-SEM approach. International Journal of Disaster Resilience in the Built Environment, ISSN 1759-5908

Adabre, M A and Chan, A P C (2020) Towards a sustainability assessment model for affordable housing projects: The perspective of professionals in Ghana. Engineering, Construction and Architectural Management, 27(9), pp. 2523-2551. ISSN 0969-9988

Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193

Ahrari, A (2012) A decision support system for dynamic integrated project scheduling and equipment operation planning. PhD thesis, University of Maryland, College Park, USA.

Ahuja, H N and Arunachalam, V (1984) Risk evaluation in resource allocation. Journal of Construction Engineering and Management, 110(3), pp. 324-336. ISSN 0733-9364

Aiyetan, Ayodeji; Das, Kumar Dillip and Ayodabo, Blessing (2026) Factors influencing procurement in construction: The role of clients and construction machinery in KwaZulu-Natal. Journal of Construction Business and Management, 8(S1), pp. 72-87. ISSN 2521-0165

Akhavian, Reza (2015) Data-driven simulation modeling of construction and infrastructure operations using process knowledge discovery. PhD thesis, University of Central Florida, USA.

Aksorn, T and Hadikusumo, B H W (2007) Gap analysis approach for construction safety program improvement. Journal of Construction in Developing Countries, 12(1), pp. 77-97. ISSN 1823-6499

Al-Hashimy, H. N. H. and Yao, J. (2026) The moderating role of electronic accounting information systems in enhancing efficiency in construction project management. Engineering, Construction and Architectural Management, 33(4), pp. 3308-3331. ISSN 0969-9988

Al-Nasser, A A (2001) Optimisation of construction implemented as a manufacturing process. PhD thesis, University of Sussex, UK.

Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988

Almatroushi, H; Hariga, M; As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: An integrated approach. Engineering, Construction and Architectural Management, 27(9), pp. 2135-2161. ISSN 0969-9988

Almeraikhi, A M (2010) An integrated framework for multi-project planning and control. PhD thesis, Sheffield Hallam University, UK.

Alqudah, H E (2022) The Interaction Between the Main Determinants of Construction Organisational Performance in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Alsugair, A M (1992) An intelligent resource allocation system. PhD thesis, Texas A&M University, USA.

Amaechi, C V; Ullah, S; Deng, X; Beddu, S B; Ja'e, I A; Mohamed, D B and Syamsir, A (2026) Utilising factor analysis on political risks including strategies of managing firm-specific risk factors for multinational construction projects in Pakistan. Engineering, Construction and Architectural Management, 33(1), pp. 1-27. ISSN 0969-9988

Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193

Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193

An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988

Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(2), pp. 163-175. ISSN 1466433X

Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.

Ansari, R (2019) Dynamic simulation model for project change-management policies: Engineering project case. Journal of Construction Engineering and Management, 145(7): 05019008, ISSN 0733-9364

Anspach, J A; Sharma, V and Madathil, K C (2024) Hospital design planning: unscheduled trauma ER visits impacting inpatient space allocation. Building Research & Information, 52(7), pp. 836-850. ISSN 0961-3218

Appireddy, K and George, G (2026) Lean tools for enhancing construction project performance: Integration of LPS and LBMS in utility power distribution projects. International Journal of Construction Management, 26(5), pp. 789-804. ISSN 1562-3599

Arditi, D; Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), pp. 90-103. ISSN 0969-9988

Asare, S O; Fobiri, G and Bondinuba, F K (2025) Enhancing fairness, transparency and accountability during tendering under Ghana's procurement system: A systematic review. Built Environment Project and Asset Management, 15(1), pp. 33-50. ISSN 2044-124X

Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364

Aslani, P (2007) Dynamic resource -constrained scheduling. PhD thesis, Polytechnic University, USA.

Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599

Azman, Mohd Azrai (2020) Diversification, institutions, and productivity performance of large construction firms in Malaysia. PhD thesis, Queensland University of Technology, Australia.

Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099

Bahadir, M (2025) Predicting construction project durations in Europe using regression analysis methodology. DEngr thesis, George Washington University, USA.

Barroso-Aguilar, L F (1973) An integrated modeling methodology for project-site management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.

Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193

Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.

Bettemir, O H (2025) Analysis of existing resource distribution metrics and suggestion of new metrics. Journal of Construction Engineering and Management, 151(2): 04024195, ISSN 0733-9364

Bidhendi, A.; Poshdar, M.; Babaeian Jelodar, M.; Rahimian, F. and González, V. A. (2026) Human-centric integrated change management framework for digital transformation in construction. Engineering, Construction and Architectural Management, 33(3), pp. 2048-2070. ISSN 0969-9988

Biltonen, E F (2001) Cost-benefit analysis of a flood protection project incorporating poverty alleviation concerns: Case study Vietnam. PhD thesis, Colorado State University, USA.

Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems. PhD thesis, University of California, Berkeley, USA.

Calvert, G S (2021) A multiple defect approach to bridge life cycle modelling. PhD thesis, University of Nottingham, UK.

Castro-Lacouture, D; Süer, G A; Gonzalez-Joaqui, J and Yates, J K (2009) Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method. Journal of Construction Engineering and Management, 135(10), pp. 1096-1104. ISSN 0733-9364

Chan, P W (2005) An interpretivistic approach to understand the factors that affect construction labour productivity. PhD thesis, Heriot-Watt University, UK.

Chan, W T; Chua, D K H and Kannan, G (1996) Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, 122(2), pp. 125-132. ISSN 0733-9364

Chang, D Y-M (1986) RESQUE: A resource based simulation system for construction process planning. PhD thesis, University of Michigan, USA.

Chang, R D; Zuo, J; Soebarto, V; Zhao, Z Y; Zillante, G and Gan, X L (2017) Discovering the transition pathways toward sustainability for construction enterprises: Importance-performance analysis. Journal of Construction Engineering and Management, 143(6): 04017013, ISSN 0733-9364

Chang, T C; William, C and Crandall, K C (1990) Network resource allocation with support of a fuzzy expert system. Journal of Construction Engineering and Management, 116(2), pp. 239-260. ISSN 0733-9364

Chang, T-C (1987) Network resource allocation using an expert system with fuzzy logic reasoning. PhD thesis, University of California, Berkeley, USA.

Chatterjee, S (2010) Development of an analytic basis for performing all-hazards risk management. PhD thesis, Vanderbilt University, USA.

Chen, B.; Luo, M.; Yu, H. and Zhang, N. (2026) Analyzing the critical factors of digital readiness for construction enterprises. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988

Chen, B.; Luo, M.; Yu, H. and Zhang, N. (2026) Analyzing the critical factors of digital readiness for construction enterprises. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, Jamie (2025) Improving construction supply chain material management resilience through mathematical optimisation. PhD thesis, University of New South Wales, Australia.

Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.

Chileshe, N; Njau, C W; Kibichii, B K; Macharia, L N and Kavishe, N (2022) Critical success factors for public-private partnership (PPP) infrastructure and housing projects in Kenya. International Journal of Construction Management, 22(9), pp. 1606-1617. ISSN 1562-3599

Christodoulou, S E; Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5), pp. 518-527. ISSN 0733-9364

Christodoulou, S E; Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(3), pp. 229-240. ISSN 1466433X

Chua, D K H and Li, G M (2002) RISim: Resource-interacted simulation modeling in construction. Journal of Construction Engineering and Management, 128(3), pp. 195-202. ISSN 0733-9364

Cole, R J; Busby, P; Guenther, R; Briney, L; Blaviesciunaite, A and Alencar, T (2012) A regenerative design framework: Setting new aspirations and initiating new discussions. Building Research & Information, 40(1), pp. 95-111. ISSN 0961-3218

Connaughton, J N (1993) Making and implementing industrial building investment decisions. PhD thesis, University of Greenwich, UK.

Da Silva, W O P; Farias, B A; Monteiro, I B; Pegorini, V; Casanova, D and Bisconsini, D R (2024) Development of global quality index of unpaved roads. Journal of Construction Engineering and Management, 150(1): 04023147, ISSN 0733-9364

Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364

Damrianant, Jirawat (1999) Petri net-based systems for construction-process modelling and simulation. PhD thesis, University of New South Wales, Australia.

Demirkesen, S (2024) Prediction of number of insured having work accident in Turkish construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 193-206. ISSN 17514304

Desgagné-Lebeuf, A; Lehoux, N and Beauregard, R (2022) Scheduling tools for the construction industry: Overview and decision support system for tool selection. International Journal of Construction Management, 22(14), pp. 2687-2698. ISSN 1562-3599

Dina Koutsikouri, D A A S (2006) Critical success factors for multidisciplinary engineering projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Do, Q; Moriyani, M A; Le, T; Le, C and Piratla, K (2025) Enhanced highway project clustering framework to support project cost estimation. Journal of Construction Engineering and Management, 151(1): 04024191, ISSN 0733-9364

Doulabi, S H H; Seifi, A and Shariat, S Y (2011) Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. ISSN 0733-9364

Dowsett, R M and Harty, C F (2014) The wider implementation issues of BIM within a multifaceted property and real estate consultancy. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Doyle, A and Hughes, W P (2000) The influence of project complexity on estimating accuracy. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Du, J; Liu, B; Hu, Y and Castro-Lacouture, D (2024) Analyzing Prefabricated Components Supply Chain Cooperation Patterns with Multiparty Dynamics Using Evolutionary Game Theory. Journal of Construction Engineering and Management, 150(12): 04024175, ISSN 0733-9364

Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364

Ebrahimi, G and Dowlatabadi, H (2019) Perceived challenges in implementing integrated project delivery (IPD): Insights from stakeholders in the U.S. And Canada for a path forward. International Journal of Construction Education and Research, 15(4), pp. 291-314. ISSN 1557-8771

El-Rayes, K and Jun, D H (2009) Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), pp. 1172-1180. ISSN 0733-9364

El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(5), pp. 639-653. ISSN 0969-9988

Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364

Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(5), pp. 2106-2129. ISSN 0969-9988

Elkholosy, H; Ead, R; Hammad, A and AbouRizk, S (2024) Data mining for forecasting labor resource requirements: A case study of project management staffing requirements. International Journal of Construction Management, 24(5), pp. 561-572. ISSN 1562-3599

Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.

Faniran, O O; Love, P E D and Li, H (1999) Optimal allocation of construction planning resources. Journal of Construction Engineering and Management, 125(5), pp. 311-319. ISSN 0733-9364

Farshchian, M M; Heravi, G and Abourizk, S (2017) Optimizing the owner's scenarios for budget allocation in a portfolio of projects using agent-based simulation. Journal of Construction Engineering and Management, 143(7): 04017022, ISSN 0733-9364

Fathalizadeh, A; Hosseini, M R; Vaezzadeh, S S; Edwards, D J; Martek, I and Shooshtarian, S (2022) Barriers to sustainable construction project management: The case of Iran. Smart and Sustainable Built Environment, 11(3), pp. 717-739. ISSN 2046-6099

Feige, A; McAllister, P and Wallbaum, H (2013) Rental price and sustainability ratings: Which sustainability criteria are really paying back? Construction Management and Economics, 31(4), pp. 322-334. ISSN 1466433X

Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Fondahl, J W (1991) The development of the construction engineer: Past progress and future problems. Journal of Construction Engineering and Management, 117(3), pp. 380-392. ISSN 0733-9364

France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects. PhD thesis, University of Texas at Austin, USA.

Friend, R M; Thinphanga, P; Macclune, K; Henceroth, J; van Gai Tran, P and Nghiem, T P (2015) Urban transformations and changing patterns of local risk: Lessons from the Mekong region. International Journal of Disaster Resilience in the Built Environment, 6(1), pp. 30-43. ISSN 1759-5916

Frimpong, S; Sunindijo, R Y; Wang, C C; Boadu, E F; Dansoh, A and Fagbenro, R K (2025) A scoping review of research on mental health conditions among young construction workers. Construction Innovation, 25(1), pp. 5-34. ISSN 1471-4175

Gao, T (2014) Dynamic approach to stakeholder theory for temporary organizations. PhD thesis, Stevens Institute of Technology, USA.

Garcia, R (2018) California energy policy alternatives for commercial buildings to create energy resiliency, reduce carbon emissions, and lessen dependency on electrical utilities for the future California economy. EdD thesis, Brandman University, USA.

Garvin, M J (2001) Strategic indicators for characterization of water system infrastructure and management. PhD thesis, Massachusetts Institute of Technology, USA.

Georgy, M and Basily, S Y (2008) Using genetic algorithms in optimizing construction material delivery schedules. Construction Innovation, 8(1), pp. 23-45. ISSN 1471-4175

Ghavidel, A (2025) AI-informed multi-threat decision-support methodology for long-term bridge asset management. PhD thesis, University of Texas at San Antonio, USA.

Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175

Govender, N.; Laryea, S. and Watermeyer, R. (2026) Through the client's lens: Factors impacting project document quality in the South African construction industry. Engineering, Construction and Architectural Management, 33(15), pp. 345-361. ISSN 0969-9988

Guikema, S D (2003) Optimal resource allocation in an engineering design team with asymmetric information. PhD thesis, Stanford University, USA.

Guven, G and Ergen, E (2021) Tracking major resources for automated progress monitoring of construction activities: Masonry work case. Construction Innovation, 21(4), pp. 648-667. ISSN 1471-4175

Guyer, R C and Laman, J A (2012) Short-line railroad management system for bridge prioritization. Built Environment Project and Asset Management, 2(1), pp. 25-40. ISSN 2044-124X

Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364

Hadizadeh-Bazaz, M.; Navarro, I. J. and Yepes, V. (2026) Smart integration of non-destructive damage detection and life-cycle assessment for sustainable maintenance of coastal bridges. Smart and Sustainable Built Environment, pp. 1-27. ISSN 2046-6099

Hague, D J (1985) Incentives and motivation in the construction industry: A critique. Construction Management and Economics, 3(2), pp. 163-170. ISSN 01446193

Hallowell, M R and Gambatese, J A (2009) Construction safety risk mitigation. Journal of Construction Engineering and Management, 135(12), pp. 1316-1323. ISSN 0733-9364

Halpin, D W (1973) An investigation of the use of simulation networks for modeling construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hammad, A W; Grzybowska, H; Sutrisna, M; Akbarnezhad, A and Haddad, A (2020) A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Construction Management and Economics, 38(6), pp. 534-551. ISSN 01446193

Han, J; Chen, C; Tiong, R L K; Wu, K and Chew, D K H (2024) Strategic workforce planning for production of prefabricated bathroom units: An advanced markovian approach. Journal of Construction Engineering and Management, 150(8): 04024097, ISSN 0733-9364

Hanna, A S; Peterson, P and Lee, M J (2002) Benchmarking productivity indicators for electrical/mechanical projects. Journal of Construction Engineering and Management, 128(4), pp. 331-337. ISSN 0733-9364

Harding, A M (1999) A global approach to project optimisation. PhD thesis, University of Edinburgh, UK.

Hariga, M and El-Sayegh, S M (2011) Cost optimization model for the multiresource leveling problem with allowed activity splitting. Journal of Construction Engineering and Management, 137(1), pp. 56-64. ISSN 0733-9364

Harris, R B (1990) Packing method for resource leveling (PACK). Journal of Construction Engineering and Management, 116(2), pp. 331-350. ISSN 0733-9364

Harun, Z B (1993) Computer simulation in decision support systems for management of construction projects. PhD thesis, University of Leeds, UK.

Hassanein, A and Moselhi, O (2004) Planning and scheduling highway construction. Journal of Construction Engineering and Management, 130(5), pp. 638-646. ISSN 0733-9364

Hassanein, A A G and Melin, J W (1996) Time constraints set by prime contractors for their sub-contractors. Building Research & Information, 24(5), pp. 293-301. ISSN 0961-3218

Hatayama, H and Tahara, K (2016) Using decomposition analysis to forecast metal usage in the building stock. Building Research & Information, 44(1), pp. 63-72. ISSN 0961-3218

Hedborg, S (2022) ”It’s in the between”: Inter-project organising in project ecologies. PhD thesis, KTH Royal Institute of Technology, Sweden.

Hegazy, T (1999) Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), pp. 167-175. ISSN 0733-9364

Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364

Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364

Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364

Hepworth, A (2021) Decision-making in immature projects organisational environment: A mental model approach that influences conscientious critical thinking. PhD thesis, University of Liverpool, UK.

Hillebrandt, P M and Meikle, J L (1985) Resource planning for construction. Construction Management and Economics, 3(3), pp. 249-263. ISSN 01446193

Hiyassat, M A S (2000) Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4), pp. 278-284. ISSN 0733-9364

Hiyassat, M A S (2001) Applying modified minimum moment method to multiple resource leveling. Journal of Construction Engineering and Management, 127(3), pp. 192-198. ISSN 0733-9364

Holmes, R and Droop, C S S (1983) Maintenance of local authority housing: 2. Work done, characteristics and resource planning. Construction Papers, 2(2), pp. 83-90. ISSN 0144-8587

Hong, Z; Tam, C M and Shi, J J (2001) Resource allocation heuristic in construction simulation. Construction Management and Economics, 19(6), pp. 643-651. ISSN 01446193

Horsthuis, C; Thomson, D S and Fernie, S (2012) The case for slack to promote innovative behaviour in construction firms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193

Huang, Y (2010) Sustainable infrastructure system modeling under uncertainties and dynamics. PhD thesis, University of California, Davis, USA.

Hussain, A.; Che Ibrahim, C. K. I.; Belayutham, S.; Manu, P. and Cheung, C. (2026) Exploring regulatory capabilities for design for safety in construction: The case of Malaysia. Built Environment Project and Asset Management, 16(2), pp. 221-241. ISSN 2044-124X

Hwang, Hyemi (2011) Rational irrationality: The making of property decisions in firms as a part of resource allocation processes - a Korean example. PhD thesis, University of New South Wales, Australia.

Ibbs, W and Nguyen, L D (2007) Schedule analysis under the effect of resource allocation. Journal of Construction Engineering and Management, 133(2), pp. 131-138. ISSN 0733-9364

Ibrahim, A A R (1995) An empirical analysis of the strategic group concept within the UK construction industry. PhD thesis, Heriot-Watt University, UK.

Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364

Iranagh, M A and Sonmez, R (2012) A genetic algorithm for resource levelling of construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Irving, P A (2016) Explicating excessive financial resource allocation by building control in achieving regulatory conformity in domestic extensions. PhD thesis, University of Salford, UK.

Ismail, F; Ruikar, K D; Carrillo, P and Anumba, C J (2009) Technology transfer in construction: Learning from the manufacturing industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Jablonowski, C J (2015) Quantitative method to model the underreporting of safety incidents. Journal of Construction Engineering and Management, 141(5): 06014012, ISSN 0733-9364

Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.

Jeon, J; Zhang, Y; Yang, L; Xu, X; Cai, H and Tran, D (2023) Risk breakdown matrix for risk-based inspection of transportation infrastructure projects. Journal of Construction Engineering and Management, 149(4): 04023007, ISSN 0733-9364

Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364

Johar, N (2017) Community participation: A cementing process, theorizing various dimensions and approaches. Journal of Construction in Developing Countries, 22(S1), pp. 47-61. ISSN 1823-6499

John, G (2007) Assessment of the use of resource scheduling facilities in project management software packages for large contractors. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364

Kaplan, Z. and Abrishami, S. (2026) Integrating HBIM and big data analytics for disaster risk management in cultural heritage conservation. Smart and Sustainable Built Environment, 15(5), pp. 2038-2064. ISSN 2046-6099

Karaa, F A and Nasr, A Y (1986) Resource management in construction. Journal of Construction Engineering and Management, 112(3), pp. 346-357. ISSN 0733-9364

Karami, H and Olatunji, O A (2019) Key value engineering protocols in marine projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 21-31. ISSN 17514304

Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193

Karunarathna, D C; Perera, H A H P; Perera, B A K S and Disaratna, P A P V D S (2025) Influence of delay in utility shifting for extension of time claims in road construction projects in Sri Lanka. Smart and Sustainable Built Environment, 14(2), pp. 489-510. ISSN 2046-6099

Kauffold, P V (1977) Critical resource allocation in stochastic project networks. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Khalili, A (2013) An IFC-based framework for optimizing level of prefabrication in industrialized building systems. PhD thesis, National University of Singapore, Singapore.

Khan, A. A.; Yu, R.; Liu, T.; Gu, N.; Walsh, J. and Mohandes, S. R. (2026) Nudge or mandate: An exploration into the constraints of volumetric modular construction in Australia. Smart and Sustainable Built Environment, 15(3), pp. 1115-1148. ISSN 2046-6099

Kim, J L (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics, 31(1), pp. 3-19. ISSN 1466433X

Kim, K and De La Garza, J M (2003) Phantom float. Journal of Construction Engineering and Management, 129(5), pp. 507-517. ISSN 0733-9364

Kim, K and De La Garza, J M (2005) Evaluation of the resource-constrained critical path method algorithms. Journal of Construction Engineering and Management, 131(5), pp. 522-532. ISSN 0733-9364

Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies). PhD thesis, University of Wisconsin - Madison, USA.

Koulinas, G K and Anagnostopoulos, K P (2012) Construction resource allocation and leveling using a threshold accepting-based hyperheuristic algorithm. Journal of Construction Engineering and Management, 138(7), pp. 854-863. ISSN 0733-9364

Kwok, T W and Chang, S (2025) Comprehensive evaluation of digital technology's effects on the supply chain of prefabricated construction. Engineering, Construction and Architectural Management, 32(8), pp. 5350-5370. ISSN 0969-9988

Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.

Lau, S C; Lu, M and Poon, C S (2014) Formalized approach to discretize a continuous plant in construction simulations. Journal of Construction Engineering and Management, 140(8): 04014032, ISSN 0733-9364

Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599

Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193

Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193

Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364

Li, X.; Lin, M.; Chen, J. and Jim, C. Y. (2026) A lifecycle-based risk assessment framework for prefabricated building supply chains using G1-entropy weight and cloud matter-element models. Engineering, Construction and Architectural Management, 33(7), pp. 5645-5674. ISSN 0969-9988

Li, H; Chan, G; Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(5), pp. 536-550. ISSN 0969-9988

Li, H; Wang, M and Dong, X (2019) Resource leveling in projects with stochastic minimum time lags. Journal of Construction Engineering and Management, 145(4): 04019015, ISSN 0733-9364

Li, H; Xu, Z and Demeulemeester, E (2015) Scheduling policies for the stochastic resource leveling problem. Journal of Construction Engineering and Management, 141(2): 04014072, ISSN 0733-9364

Li, Liancheng (2025) Towards sustainable recovery of waste plastics with the Australian construction industry: Transition scenarios and environmental impact evaluation. PhD thesis, University of Adelaide, Australia.

Li, Y (2023) Integrated multi-stage decision-support for enhanced infrastructure restoration under uncertainty. PhD thesis, George Mason University, USA.

Liang, X (2012) Development of a framework for real-time 3D positioning and visualization of construction resources. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liao, C W (2015) Optimal inspection strategies for labor inspection in the construction industry. Journal of Construction Engineering and Management, 141(2): 04014073, ISSN 0733-9364

Lim, T; Porras-Alvarado, J D and Zhang, Z (2019) Pricing of highway infrastructure for transportation asset management. Built Environment Project and Asset Management, 9(1), pp. 64-79. ISSN 2044-124X

Liu, W; Feng, Z and Luo, X (2026) Study of a risk-sharing mechanism in a prefabricated building project supply chain. Journal of Construction Engineering and Management, 152(6): 04026063, ISSN 0733-9364

Liu, C; Ji, W; Abourizk, S M and Siu, M F F (2019) Equipment logistics performance measurement using data-driven social network analysis. Journal of Construction Engineering and Management, 145(5): 04019033, ISSN 0733-9364

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, L-Y (1991) Coops: Construction object-oriented process simulation system. PhD thesis, University of Michigan, USA.

Liu, P (2024) Trustworthy civil infrastructure inspection through human-machine intelligence integration. PhD thesis, Carnegie Mellon University, USA.

Liu, Y and Mohamed, Y (2012) Modelling industrial construction operations using a multi-agent resource allocation framework. Engineering, Construction and Architectural Management, 19(4), pp. 406-427. ISSN 0969-9988

Lopane, F D (2022) Spatial optimisation for resilient infrastructure services. PhD thesis, University of Newcastle upon Tyne, UK.

Lowe, D J; Parvar, J and Emsley, M W (2004) Development of a decision support system (DSS) for the contractor's decision to bid: Regression analysis and neural networks solutions. Journal of Financial Management of Property and Construction, 9(1), pp. 27-42. ISSN 1366-4387

Lowe, J G (1987) The measurement of productivity in the construction industry. Construction Management and Economics, 5(2), pp. 101-113. ISSN 01446193

Lu, M and Lam, H C (2008) Critical path scheduling under resource calendar constraints. Journal of Construction Engineering and Management, 134(1), pp. 25-31. ISSN 0733-9364

Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364

Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.

Lyu, P (2025) Assessing the impact of weather conditions on safety in construction environments: Data-driven approaches for learning from accidents. PhD thesis, Arizona State University, USA.

Ma, G; Wang, A; Li, N; Gu, L and Ai, Q (2014) Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12): 04014055, ISSN 0733-9364

Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.

Mahdavian, A and Shojaei, A (2020) Hybrid genetic algorithm and constraint-based simulation framework for building construction project planning and control. Journal of Construction Engineering and Management, 146(12): 04020140, ISSN 0733-9364

Malekaee Ashtiyani, F; Karimi Gavareshki, M H and Gheidar-Kheljani, J (2026) AI-based multi-layer framework for monitoring productivity and coordinating subcontractors in construction projects. International Journal of Construction Management, 26(5), pp. 905-924. ISSN 1562-3599

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Assessing the performance and productivity of labour in building construction projects through the application of work-based training practices. Construction Innovation, 24(2), pp. 558-583. ISSN 1471-4175

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Evaluating the efficiency and productivity of general workers in structural work practices of building construction through work-based training applications. International Journal of Construction Management, 24(3), pp. 339-350. ISSN 1562-3599

Mansouri, S; Castronovo, F and Akhavian, R (2020) Analysis of the synergistic effect of data analytics and technology trends in the AEC/FM industry. Journal of Construction Engineering and Management, 146(3): 04019113, ISSN 0733-9364

Marion, G L C; Saurin, T A and Viana, D D (2025) The cost-benefit of slack in production planning and control in construction projects. Construction Management and Economics, 43(11), pp. 883-900. ISSN 0144-6193

Marsh, R (2017) Building lifespan: Effect on the environmental impact of building components in a Danish perspective. Architectural Engineering and Design Management, 13(2), pp. 80-100. ISSN 1745-2007

Martinez, J G; Yeung, T; Sacks, R; Shahaf, Y and Sharoni, L O (2023) Situational awareness in construction using a serious game. Journal of Construction Engineering and Management, 149(3): 04022183, ISSN 0733-9364

Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.

Mattila, K G and Abraham, D M (1998) Linear scheduling: Past research efforts and future directions. Engineering, Construction and Architectural Management, 5(3), pp. 294-303. ISSN 0969-9988

Mattila, K G and Abraham, D M (1998) Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), pp. 232-243. ISSN 0733-9364

Mehmood, U.; Ujang, U. and Azri, S. (2026) Spatiotemporal 3D GIS-integrated rule-based scheduling for high-rise maintenance optimisation: A Malaysian case study. Built Environment Project and Asset Management, 16(2), pp. 321-337. ISSN 2044-124X

Miller, S and Dorée, A (2008) Improving logistics in the asphalt paving process: What can we learn from the planner's logic? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Mitropoulos, P; Cupido, G and Namboodiri, M (2009) Cognitive approach to construction safety: Task demand-capability model. Journal of Construction Engineering and Management, 135(9), pp. 881-889. ISSN 0733-9364

Mohammadi, S; Tavakolan, M and Zahraie, B (2022) An intelligent simulation-based framework for automated planning of concrete construction works. Engineering, Construction and Architectural Management, 29(2), pp. 916-939. ISSN 0969-9988

Mohandes, S. R.; Singh, A. K.; Ibrahim, A.; Ma, N.; Kineber, A. F. and Shakor, P. (2026) Pioneering digital transformation: Unveiling the blockchain and digital twin technologies' synergy. Journal of Engineering, Design and Technology, 24(4), pp. 1076-1100. ISSN 1726-0531

Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.

Morua Padilla, E (1986) Resource strategies for dynamic construction project management. PhD thesis, University of Michigan, USA.

Moselhi, O and Lorterapong, P (1993) Near optimal solution for resource-constrained scheduling problems. Construction Management and Economics, 11(4), pp. 293-303. ISSN 01446193

Mostafavi, A; Abraham, D; Noureldin, S; Pankow, G; Novak, J; Walker, R; Hall, K and George, B (2013) Risk-based protocol for inspection of transportation construction projects undertaken by state departments of transportation. Journal of Construction Engineering and Management, 139(8), pp. 977-986. ISSN 0733-9364

Mostofi, F; Tokdemir, O B; Toǧan, V and Arditi, D (2024) Predicting the cost of rework in high-rise buildings using graph convolutional networks. Journal of Construction Engineering and Management, 150(8): 04024085, ISSN 0733-9364

Mun, H.; Jeong, J.; Jeong, J. and Kumi, L. (2026) Unsupervised learning approach for benchmark models to identify construction projects with high accident risk levels. Engineering, Construction and Architectural Management, 33(5), pp. 3777-3798. ISSN 0969-9988

Munaro, M R; Freitas, M D C D; Tavares, S F and Bragança, L (2021) Circular business models: Current state and framework to achieve sustainable buildings. Journal of Construction Engineering and Management, 147(12): 04021164, ISSN 0733-9364

Na, R (2013) Property rights analysis of building material pricing. PhD thesis, University of Hong Kong, Hong Kong.

Nakano, V M (2008) A design assessment system to protect buildings from internal chemical and biological threats. PhD thesis, Purdue University, USA.

Nasirian, A; Arashpour, M; Abbasi, B and Akbarnezhad, A (2019) Optimal work assignment to multiskilled resources in prefabricated construction. Journal of Construction Engineering and Management, 145(4): 1627, ISSN 0733-9364

Nassri, S; Talebi, S; Elghaish, F; Koohestani, K; McIlwaine, S; Hosseini, M R; Poshdar, M and Kagioglou, M (2023) Labor waste in housing construction projects: An empirical study. Smart and Sustainable Built Environment, 12(2), pp. 325-340. ISSN 2046-6099

Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ng, S T; Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(1), pp. 77-97. ISSN 1471-4175

Nguyen, B T H; Wong, P S P and Ahankoob, A (2025) Enhancing flood risk governance in Australia: Challenges, opportunities, and international insights. Construction Economics and Building, 25(3-4), pp. 254-271. ISSN 2204-9029

Nguyen, L D and Ibbs, W (2008) Flora: New forensic schedule analysis technique. Journal of Construction Engineering and Management, 134(7), pp. 483-491. ISSN 0733-9364

Nguyen, L D; Le-Hoai, L; Tran, D Q; Dang, C N and Nguyen, C V (2019) Effect of project complexity on cost and schedule performance in transportation projects. Construction Management and Economics, 37(7), pp. 384-399. ISSN 01446193

Nguyen, L d (2007) The dynamics of float, logic, resource allocation, and delay timing in forensic schedule analysis and construction delay claims. PhD thesis, University of California, Berkeley, USA.

Nosair, I A R (1987) The relevance of computerised modelling techniques to construction management problems and training in Egypt. PhD thesis, University of Manchester, UK.

Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165

O'Brien, W J (1998) Capacity costing approaches for construction supply-chain management. PhD thesis, Stanford University, USA.

Okere, G O (2012) An investigative study of contract administration practices of general contractors on federal and state DOT projects. PhD thesis, Indiana State University, USA.

Okuwoga, A A (1994) Construction cost escalation and resource planning in Nigeria: A case study of public sector housing projects 1975-90. PhD thesis, University College London, UK.

Olivieri, H; Seppänen, O and Denis Granja, A (2018) Improving workflow and resource usage in construction schedules through location-based management system (LBMS). Construction Management and Economics, 36(2), pp. 109-124. ISSN 01446193

Ollár, A (2024) Spatial design for circularity in residential buildings: Exploring the case of the kitchen. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Ombwayo, J; Kidombo, H and Gakuu, C (2026) Moderating influence of stakeholder involvement on the relationship between project management lifecycle and performance of slum upgrading projects: A case of Nairobi city county, Kenya. International Journal of Construction Management, 26(1), pp. 1-11. ISSN 1562-3599

Opdyke, A; Lepropre, F; Javernick-Will, A and Koschmann, M (2017) Inter-organizational resource coordination in post-disaster infrastructure recovery. Construction Management and Economics, 35(8-9), pp. 514-530. ISSN 01446193

Orabi, W and El-Rayes, K (2012) Optimizing the rehabilitation efforts of aging transportation networks. Journal of Construction Engineering and Management, 138(4), pp. 529-539. ISSN 0733-9364

Orabi, W; El-Rayes, K; Senouci, A B and Al-Derham, H (2009) Optimizing postdisaster reconstruction planning for damaged transportation networks. Journal of Construction Engineering and Management, 135(10), pp. 1039-1048. ISSN 0733-9364

Osorio-Sandoval, C A (2021) BIM-based construction simulation modelling. PhD thesis, University of Nottingham, UK.

Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387

Padilla, E M and Carr, R I (1991) Resource strategies for dynamic project management. Journal of Construction Engineering and Management, 117(2), pp. 279-293. ISSN 0733-9364

Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599

Petroutsatou, K and Giannoulis, P (2022) Analysis of construction machinery market: The case of Greece. International Journal of Construction Management, 22(9), pp. 1667-1674. ISSN 1562-3599

Plaut, J M; Dunbar, B; Wackerman, A and Hodgin, S (2012) Regenerative design: The lenses framework for buildings and communities. Building Research & Information, 40(1), pp. 112-122. ISSN 0961-3218

Polat, G (2010) Using ANP priorities with goal programming in optimally allocating marketing resources. Construction Innovation, 10(3), pp. 346-365. ISSN 1471-4175

Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.

Pourafshar, O; Barmayehvar, B; Esmaeilabadi, R and Asnaashari, E (2025) An integrated FAHP-SD model to assess and allocate of critical risks for public-private partnership transportation projects. International Journal of Construction Management, 25(6), pp. 605-623. ISSN 1562-3599

Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988

Prince, M W (1988) Strategic planning in construction firms: Perceptions and personal characteristics of the manager, strategic planning behaviour, and subjective performance in a large scale survey of the canadian construction industry. PhD thesis, University of Bradford, UK.

Puri, V (2012) Incorporation of continuous activities into activity cycle diagram based discrete event simulation for construction operations. PhD thesis, Purdue University, USA.

Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988

Rashidi, M H and Kashani, H (2023) Bayesian modeling of labor earnings in construction. Journal of Construction Engineering and Management, 149(2): 4022168, ISSN 0733-9364

Rasoulimanesh, M.; Rahai, A. and Shahhosseini, V. (2025) An integrated decision support system for strategic budget/resource allocation in bridge infrastructure management based on digital technologies. Smart and Sustainable Built Environment, 15(5), pp. 1939-1966. ISSN 2046-6099

Rasul, N; Malik, M S A; Bakhtawar, B and Thaheem, M J (2021) Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, 21(11), pp. 1099-1114. ISSN 1562-3599

Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.

Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364

Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: The influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(8), pp. 651-669. ISSN 01446193

Runeson, G and de Valence, G (2015) A critique of the methodology of building economics: Trust the theories. Construction Management and Economics, 33(2), pp. 117-125. ISSN 01446193

Rutten, Maarten (2016) Collaboration for innovation in the construction sector: Key actors and resource allocation decisions. PhD thesis, University of Twente, Netherlands.

Sacks, R and Harel, M (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management and Economics, 24(8), pp. 869-881. ISSN 1466433X

Salhab, D; Pourrahimian, E; Lindhard, S M and Hamzeh, F (2025) Patterns, 4D simulations, and artificial intelligence-driven insights: Redefining construction workspace management. Journal of Construction Engineering and Management, 151(8): 04025099, ISSN 0733-9364

Samarasingha, D.; Ranadewa, K. A. T. O. and Parameswaran, A. (2026) Extended reality-integrated construction progress monitoring in the construction industry. Journal of Engineering, Design and Technology, 24(5), pp. 1135-1155. ISSN 1726-0531

Samarghandi, H; Tabatabaei, S M M; Taabayan, P; Hashemi, A M and Willoughby, K (2016) Studying the reasons for delay and cost overrun in construction projects: The case of Iran. Journal of Construction in Developing Countries, 21(1), pp. 51-84. ISSN 1823-6499

Schatteman, D; Herroelen, W; Van De Vonder, S and Boone, A (2008) Methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134(11), pp. 885-893. ISSN 0733-9364

Seibert, J E and Evans, G W (1991) Time-constrained resource leveling. Journal of Construction Engineering and Management, 117(3), pp. 503-520. ISSN 0733-9364

Selvam, G and Tadepalli, T C M (2022) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management, 22(4), pp. 659-668. ISSN 1562-3599

Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364

Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364

Sepp nen, O (2009) Empirical research on the success of production control in building construction projects. PhD thesis, Helsinki University of Technology, Finland.

Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.

Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X

Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Shi, X.; Gong, X.; Ke, Y. and Wu, X. (2026) Bundling strategies for routine expressway maintenance projects with similarity thresholds. Journal of Construction Engineering and Management, 152(8): 04026125, ISSN 0733-9364

Shoghli, O (2014) A decision support system for multi-objective multi-asset roadway asset management (DSRAM). PhD thesis, Virginia Polytechnic Institute and State University, USA.

Shohet, I M and Perelstein, E (2004) Decision support model for the allocation of resources in rehabilitation projects. Journal of Construction Engineering and Management, 130(2), pp. 249-257. ISSN 0733-9364

Shokoohi, F. and Vosoughifar, H. (2026) Multi-dimensional sensitivity analysis of lean and sustainable construction: A novel modified trapezoidal DEMATEL–ANP (mtda) approach for integrated project management. International Journal of Construction Management, 26(10), pp. 1999-2017. ISSN 1562-3599

Sindhu, J; Choi, K; Lavy, S; Rybkowski, Z K; Bigelow, B F and Li, W (2018) Effects of front-end planning under fast-tracked project delivery systems for industrial projects. International Journal of Construction Education and Research, 14(3), pp. 163-178. ISSN 1557-8771

Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029

Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.

Smyth, H and Fitch, T (2009) Application of relationship marketing and management: A large contractor case study. Construction Management and Economics, 27(4), pp. 399-410. ISSN 1466433X

Sodeinde, O R (2024) Building damage assessment using remote sensing data and deep learning algorithms. PhD thesis, Tufts University, USA.

Sohrabi, M (2025) Statistical methods for enhanced coastal flood risk assessment and adaptation planning. PhD thesis, University of Alabama, USA.

Son, J; Jeong, J; Jeong, J; Kumi, L and Mun, H (2026) Data-driven approach to analyzing factors influencing construction accident severity using shap analysis. Journal of Construction Engineering and Management, 152(3): 04025282, ISSN 0733-9364

Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model. PhD thesis, Purdue University, USA.

Son, J and Mattila, K G (2004) Binary resource leveling model: Activity splitting allowed. Journal of Construction Engineering and Management, 130(6), pp. 887-894. ISSN 0733-9364

Son, J and Skibniewski, M J (1999) Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1), pp. 23-31. ISSN 0733-9364

Styhre, A and Brorström, S (2023) Syndicated leadership in urban development projects: The case of the River City Gothenburg project. Construction Management and Economics, 41(5), pp. 387-401. ISSN 01446193

Su, Y and Lucko, G (2015) Optimum present value scheduling based on synthetic cash flow model with singularity functions. Journal of Construction Engineering and Management, 141(11): 04015036, ISSN 0733-9364

Su, Y-Y (2010) Construction crew productivity monitoring supported by location awareness technologies. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Suhail, S A and Neale, R H (1994) CPM/LOB: New methodology to integrate CPM and line of balance. Journal of Construction Engineering and Management, 120(3), pp. 667-684. ISSN 0733-9364

Sun, J; Balakrishnan, S and Zhang, Z (2021) A resource allocation framework for predisaster resilience management of interdependent infrastructure networks. Built Environment Project and Asset Management, 11(2), pp. 284-303. ISSN 2044-124X

Swaris, N; Halwatura, R U and Amaratunga, D (2024) Policy coherence for resilience in Sri Lanka coherence of climate change adaptation (CCA) disaster risk reduction (DRR) and sustainable development goals (SDGs). International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 450-473. ISSN 1759-5916

Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation. PhD thesis, University of Alberta, Canada.

Taghaddos, H; Abourizk, S; Mohamed, Y and Hermann, U (2012) Simulation-based auction protocol for resource scheduling problems. Journal of Construction Engineering and Management, 138(1), pp. 31-42. ISSN 0733-9364

Tang, L C M and Leung, A Y T (2009) An entropy-based financial decision support system (E-FDSS) for project analysis in construction SMEs. Construction Management and Economics, 27(5), pp. 499-513. ISSN 1466433X

Tang, P (2013) Assessing decision making strategies in construction management by using a schedule-based simulation framework. PhD thesis, Michigan Technological University, USA.

Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.

Tang, Y; Liu, R and Sun, Q (2014) Two-stage scheduling model for resource leveling of linear projects. Journal of Construction Engineering and Management, 140(7): 04014022, ISSN 0733-9364

Tatari, O; Castro-Lacouture, D and Skibniewski, M J (2007) Current state of construction enterprise information systems: Survey research. Construction Innovation, 7(4), pp. 310-319. ISSN 1471-4175

Tembo, M; Kahanji, C and Mwanaumo, E M (2025) Socio-Political and Macro-Economic Impact of Tender Price Inflation in Zambian Public Construction Projects. Journal of Construction Business and Management, 7(2), pp. 67-97.

Tharachai, T (2004) Multiple project resource scheduling for construction. PhD thesis, University of Michigan, USA.

Thomas, A V and Sudhakumar, J (2014) Modelling masonry labour productivity using multiple regression. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Thompson, B P (2009) Investigation of system dynamics applied to building simulation for anti-terrorism resource allocation. PhD thesis, University of Wisconsin - Madison, USA.

Thompson, D; Chileshe, N; Coggins, J and Stevels, A (2023) Strategic management practices and opportunities for adapting SMEs to construction industry conditions: Towards a qualitative grounded conceptual framework. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Tran, D H; Tran, K N and Nguyen, N H (2025) A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management. International Journal of Construction Management, 25(10), pp. 1141-1153. ISSN 1562-3599

Tsai, D M and Chiu, H N (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14(4), pp. 325-340. ISSN 01446193

Tsuchiya, Y (2024) Rationality and information advantage of the Japanese government’s construction forecasts over economic development. Construction Management and Economics, 42(8), pp. 671-694. ISSN 01446193

Tufte, E A (1986) Construction project resource management system. PhD thesis, North Dakota State University, USA.

Ullah, F; Ayub, B; Siddiqui, S Q and Thaheem, M J (2016) A review of public-private partnership: Critical factors of concession period. Journal of Financial Management of Property and Construction, 21(3), pp. 269-300. ISSN 1366-4387

Ullah, F and Thaheem, M J (2018) Concession period of public private partnership projects: Industry-academia gap analysis. International Journal of Construction Management, 18(5), pp. 418-429. ISSN 1562-3599

Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364

Vatterott, A G (2018) A multi-skilled approach to property maintenance considering temporal, spatial and resource constraints. PhD thesis, University of Missouri - Saint Louis, USA.

Vaziri, K (2006) Program planning under uncertainty. PhD thesis, Cornell University, USA.

Vaziri, K; Carr, P G and Nozick, L K (2007) Project planning for construction under uncertainty with limited resources. Journal of Construction Engineering and Management, 133(4), pp. 268-276. ISSN 0733-9364

Victar, H C; Perera, B A K S; Palihakkara, A D and Dewagod, K G (2024) Roles and competencies of quantity surveyors in achieving a circular built environment: An investigation according to 3r principles. Smart and Sustainable Built Environment, 13(4), pp. 1015-1040. ISSN 2046-6099

Victar, H C and Waidyasekara, A S (2025) Optimising construction waste management in Sri Lanka through Circular economy strategies: A focus on construction and renovation and use and operate stages. Engineering, Construction and Architectural Management, 32(7), pp. 4275-4309. ISSN 0969-9988

Visser, A T (1981) An evaluation of unpaved road performance and maintenance. PhD thesis, University of Texas at Austin, USA.

Vyčítal, M (2019) On BIM based automatized nD modelling for construction management. PhD thesis, Czech Technical University, Czech Republic.

Walsh, K D; Sawhney, A and Bashford, H H (2007) Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), pp. 254-261. ISSN 0733-9364

Wang, J.; Qu, Z.; Lee, C. Y. and Skitmore, M. (2025) Highway construction cost index forecasting: A hybrid VMD–LSTM–GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193

Wang, J; Qu, Z and Skitmore, M (2026) Predicting construction cost index using a VMD-GRU framework with the mhsa mechanism. Journal of Construction Engineering and Management, 152(1): 04025236, ISSN 0733-9364

Wang, D; Wang, X; Wang, L; Liu, H; Sing, M and Liu, B (2023) Optimisation of government subsidies in infrastructure public-private partnerships. Journal of Engineering, Design and Technology, 21(5), pp. 1280-1302. ISSN 1726-0531

Wang, J; Qu, Z; Lee, C Y and Skitmore, M (2025) Highway construction cost index forecasting: A hybrid VMD-LSTM-GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193

Wang, P; Fenn, P; Wang, K and Huang, Y (2022) A Bayesian belief network predictive model for construction delay avoidance in the UK. Engineering, Construction and Architectural Management, 29(5), pp. 2011-2026. ISSN 0969-9988

Wang, T-K (2010) An information model for subcontractor resource allocation. PhD thesis, University of Texas at Austin, USA.

Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.

Waqar, A; Othman, I B and Mansoor, M S (2025) Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: Mediating role of project control. Engineering, Construction and Architectural Management, 32(9), pp. 6095-6114. ISSN 0969-9988

Weerasooriya, D; Perera, B A K S; Ranadewa, K A T O and Gallage, S D (2025) Scrutinizing the shift: investigating quantity surveyors' adaptability to cyber-physical systems. International Journal of Construction Management, 25(2), pp. 139-148. ISSN 1562-3599

Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Windapo, A; Moghayedi, A; Oliphant, D and Adediran, A (2018) Exploring the components of cost on construction projects. Journal of Construction Business and Management, 2(2), pp. 42-50. ISSN 2521-0165

Wu, C; Hu, X; Guo, X and Han, Y (2026) Discretionary control over safety resources: Examining workers' safety territorial behaviors in construction projects. Journal of Construction Engineering and Management, 152(3): 04025275, ISSN 0733-9364

Wu, Lingzi (2021) Enhancing data-driven applications in construction. PhD thesis, University of Alberta, Canada.

Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708

Yin, X; Chen, Y; Bouferguene, A; Zaman, H; Al-Hussein, M and Russell, R (2020) Data-driven framework for modeling productivity of closed-circuit television recording process for sewer pipes. Journal of Construction Engineering and Management, 146(8): 04020093, ISSN 0733-9364

York, J G (2009) The entrepreneurial creation of public goods: Evidence from the green building and renewable energy industries. PhD thesis, University of Virginia, USA.

Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364

Yuan, Z; Chang, Y; Chen, Y; Wang, Y; Huang, W and Chen, C (2024) Simulating and optimizing precast wall lifting in prefabricated building construction. Engineering, Construction and Architectural Management, 31(6), pp. 2437-2456. ISSN 0969-9988

Yung, P and Lai, L W C (2008) Supervising for quality: An empirical examination of institutional arrangements in China's construction industry. Construction Management and Economics, 26(7), pp. 723-737. ISSN 1466433X

Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364

Zarghami, S A and Dumrak, J (2026) Integrating cascading effects into risk assessment of metaverse implementation in the built environment. Building Research & Information, 54(2), pp. 216-236. ISSN 0961-3218

Zayed, T M and Minkarah, I (2004) Resource allocation for concrete batch plant operation: Case study. Journal of Construction Engineering and Management, 130(4), pp. 560-569. ISSN 0733-9364

Zhang, C; Zayed, T and Hammad, A (2008) Resource management of bridge deck rehabilitation: Jacques cartier bridge case study. Journal of Construction Engineering and Management, 134(5), pp. 311-319. ISSN 0733-9364

Zhang, H; Shi, J J and Tam, C M (2002) Application of simulation related techniques to construction operations. Engineering, Construction and Architectural Management, 9(5-6), pp. 433-445. ISSN 0969-9988

Zhang, H and Tam, C M (2003) Fuzzy decision-making for dynamic resource allocation. Construction Management and Economics, 21(1), pp. 31-41. ISSN 01446193

Zhang, L; Zou, X and Kan, Z (2014) Improved strategy for resource allocation in repetitive projects considering the learning effect. Journal of Construction Engineering and Management, 140(11): 4014053, ISSN 0733-9364

Zhang, Y; Liu, Y; Yu, R; Zuo, J and Dong, N (2025) Managing the high capital cost of prefabricated construction through stakeholder collaboration: A two-mode network analysis. Engineering, Construction and Architectural Management, 32(1), pp. 556-577. ISSN 0969-9988

Zhong, Yunshun (2025) Leveraging large language models for intelligent construction management systems. PhD thesis, University of Toronto, Canada.

Zou, X and Rong, Z (2025) Resource-constrained repetitive project scheduling with soft logic. Engineering, Construction and Architectural Management, 32(4), pp. 2397-2429. ISSN 0969-9988

Zuo, F; Zio, E and Yuan, Y (2022) Risk-response strategy optimization considering limited risk-related resource allocation and scheduling. Journal of Construction Engineering and Management, 148(11): 04022123, ISSN 0733-9364

li, H; Chen, Z; Wong, C T C and Love, P E D (2002) A quantitative approach to construction pollution control based on resource levelling. Construction Innovation, 2(2), pp. 71-81. ISSN 1471-4175

This list was generated on Sat Aug 22 02:30:37 2026 UTC.