Items with Subject: research organizations
Abdulhadi, N H (1997) Simulation as a tool for re-engineering construction processes. PhD thesis, University of Colorado at Boulder, USA.
Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988
Adebayo, S O (1991) A study of the maintenance management of public buildings in Nigeria. PhD thesis, University of Lagos, Nigeria.
Alroomi, A; Jeong, D H S and Oberlender, G D (2012) Analysis of cost-estimating competencies using criticality matrix and factor analysis. Journal of Construction Engineering and Management, 138(11), pp. 1270-1280. ISSN 0733-9364
Anderson, S D; Patil, S S; Gibson Jr, G E and Sullivan, G R (2004) Owner-contractor work structures: Process approach. Journal of Construction Engineering and Management, 130(5), pp. 680-690. ISSN 0733-9364
Anderson, S d (1989) Potential for construction industry improvement. PhD thesis, University of Texas at Austin, USA.
Badger, W W and Mulligan, D E (1995) Rationale and benefits associated with international alliances. Journal of Construction Engineering and Management, 121(1), pp. 100-111. ISSN 0733-9364
Bakens, W (1997) International trends in building and construction research. Journal of Construction Engineering and Management, 123(2), pp. 102-112. ISSN 0733-9364
Barry, W; Leite, F and O'Brien, W J (2015) Late deliverable risk catalog: Evaluating the impacts and risks of late deliverables to construction sites. Journal of Construction Engineering and Management, 141(4): 04014087, ISSN 0733-9364
Becker, T C (2012) Improving the predictability of construction project outcomes through project level indirect construction cost practices. PhD thesis, North Carolina State University, USA.
Bell, L C and McCullouch, B G (1988) Bar code applications in construction. Journal of Construction Engineering and Management, 114(2), pp. 263-278. ISSN 0733-9364
Bello, M A (2012) Minimizing impediments to design for construction safety (DFCS) implementation on capital projects. PhD thesis, Carnegie Mellon University, USA.
Bennett, J (1993) Japan's building industry: The new model. Construction Management and Economics, 11(1), pp. 3-17. ISSN 01446193
Bosfield, R (2014) Feasibility of an open source repository for increasing the usage of best practices in the architecture-engineering-construction industry. PhD thesis, Arizona State University, USA.
Brandenburg, S G (2004) The Tier I workforce management strategy: Concept and application. PhD thesis, University of Texas at Austin, USA.
Bröchner, J and Sjöström, C (2003) Quality and coordination: Internationalizing Swedish building research. Building Research & Information, 31(6), pp. 479-484. ISSN 0961-3218
Cha, H S (2003) Selecting value management processes for implementation on capital facility projects. PhD thesis, University of Texas at Austin, USA.
Chang, T; Deng, X; Hwang, B G and Zhao, X (2019) Improving quantitative assessment of political risk in international construction projects: The case of Chinese construction companies. Journal of Construction Engineering and Management, 145(12): 04019083, ISSN 0733-9364
Collins, Wesley A (2015) Development of the project definition rating index (PDRI) for small industrial projects. PhD thesis, Arizona State University, USA.
Cozens, P; Waters, J and Neale, R (2002) A virtual reality approach to personal safety and the design of built environment facilities. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Deshpande, A S; Salem, O M and Miller, R A (2012) Analysis of the higher-order partial correlation between CII best practices and performance of the design phase in fast-track industrial projects. Journal of Construction Engineering and Management, 138(6), pp. 716-724. ISSN 0733-9364
ElZomor, M A (2017) Development of the project definition rating index (PDRI) for small infrastructure projects. PhD thesis, Arizona State University, USA.
Farrington, J J (1987) A methodology to identify and categorize costs of quality deviations in design and construction. PhD thesis, Clemson University, USA.
Garsden, B R (1995) Postconstruction evaluation. Journal of Construction Engineering and Management, 121(1), pp. 37-42. ISSN 0733-9364
Georgy, M E; Chang, L M and Zhang, L (2005) Utility-function model for engineering performance assessment. Journal of Construction Engineering and Management, 131(5), pp. 558-568. ISSN 0733-9364
Gibson, G E (1990) Data integration and transfer methodologies in industrial construction. PhD thesis, Auburn University, USA.
Gibson, G E and Bell, L C (1990) Electronic data interchange in construction. Journal of Construction Engineering and Management, 116(4), pp. 727-737. ISSN 0733-9364
Gibson Jr, G E and Gebken Ii, R J (2003) Design quality in pre-project planning: Applications of the project definition rating index. Building Research & Information, 31(5), pp. 346-356. ISSN 0961-3218
Hall, M A and Jaggar, D M (1997) Should construction enterprises, working internationally, take account of cultural differences in culture? In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Hamilton, M R (1994) The relationship between pre-project planning effort and success for capital construction projects. PhD thesis, University of Texas at Austin, USA.
Hancher, D E; De La Garza, J M and Eckert, G K (1997) Improving workers' compensation management in construction. Journal of Construction Engineering and Management, 123(3), pp. 285-291. ISSN 0733-9364
Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2008) Analysis of techniques leading to radical reduction in project cycle time. Journal of Construction Engineering and Management, 134(12), pp. 915-927. ISSN 0733-9364
Hewa Welege, N M; Pan, W and Kumaraswamy, M M (2023) Engaging stakeholders to overcome the common constraints for delivering low carbon buildings in high-rise high-density cities. Journal of Construction Engineering and Management, 149(1): 04022157, ISSN 0733-9364
Hinze, J and Wilson, G (2000) Moving toward a zero injury objective. Journal of Construction Engineering and Management, 126(5), pp. 399-403. ISSN 0733-9364
Hofstetter, M (2024) Community, markets, and conviviality : A political ecology of rural water supply. PhD thesis, Wageningen University and Research, Netherlands.
Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors. PhD thesis, Clemson University, USA.
Hsieh, T-Y (1993) Functional requirements for large-scale manipulators in industrial construction. PhD thesis, University of Texas at Austin, USA.
Hwang, B G; Thomas, S R; Haas, C T and Caldas, C H (2009) Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), pp. 187-198. ISSN 0733-9364
Ibbs, C W; Kwak, Y H; Ng, T and Murat Odabasi, A (2003) Project delivery systems and project change: Quantitative analysis. Journal of Construction Engineering and Management, 129(4), pp. 382-387. ISSN 0733-9364
Ioannou, P. G. and Liu, L. Y. (1993) Advanced construction technology system: Acts. Journal of Construction Engineering and Management, 119(2), pp. 288-306. ISSN 0733-9364
Ioannou, P G and Liu, L Y (1993) Advanced construction technology system: acts. Journal of Construction Engineering and Management, 119(2), pp. 288-306. ISSN 0733-9364
Jergeas, G and Der Put, J V (2001) Benefits of constructability on construction projects. Journal of Construction Engineering and Management, 127(4), pp. 281-290. ISSN 0733-9364
Kang, Y; O'Brien, W J; Dai, J; Mulva, S P; Thomas, S P; Chapman, R E and Butry, D (2013) Interaction effects of information technologies and best practices on construction project performance. Journal of Construction Engineering and Management, 139(4), pp. 361-371. ISSN 0733-9364
Karimi, H; Taylor, T R B; Goodrum, P M and Srinivasan, C (2016) Quantitative analysis of the impact of craft worker availability on construction project safety performance. Construction Innovation, 16(3), pp. 307-322. ISSN 1471-4175
Kim, S B (2002) Assessment of CII knowledge implementation at the organizational level. PhD thesis, University of Texas at Austin, USA.
Kim, T-y (2001) Trends of selected construction industry practices. PhD thesis, University of Texas at Austin, USA.
King, C J (2012) Project management skills of the future. PhD thesis, Arizona State University, USA.
Kumaraswamy, M; Mahesh, G; Mahalingam, A; Loganathan, S and Kalidindi, S N (2017) Developing a clients' charter and construction project KPIs to direct and drive industry improvements. Built Environment Project and Asset Management, 7(3), pp. 253-270. ISSN 2044-124X
Lee, S H; Thomas, S R and Tucker, R L (2005) Web-based benchmarking system for the construction industry. Journal of Construction Engineering and Management, 131(7), pp. 790-798. ISSN 0733-9364
Lee, S-H (2001) Discriminant function analysis for categorization of best practices. PhD thesis, University of Texas at Austin, USA.
Liang, L (2005) Small project benchmarking. PhD thesis, University of Texas at Austin, USA.
Liao, P-C (2008) Influence factors of engineering productivity and their impact on project performance. PhD thesis, University of Texas at Austin, USA.
Liaros, S (2022) A network of circular economy villages: Design guidelines for 21st century garden cities. Built Environment Project and Asset Management, 12(3), pp. 349-364. ISSN 2044-124X
Matipa, W M; Kelliher, D and Keane, M (2008) How a quantity surveyor can ease cost management at the design stage using a building product model. Construction Innovation, 8(3), pp. 164-181. ISSN 1471-4175
McLeod, J S (2000) Planning for startup: An evaluation of factors affecting the startup of process industry facilities. PhD thesis, University of Texas at Austin, USA.
Meier, J R and Russell, J S (2000) Model process for implementing maintainability. Journal of Construction Engineering and Management, 126(6), pp. 440-450. ISSN 0733-9364
Morrow, T K (1998) Effects of selected practices on project cost performance. PhD thesis, University of Texas at Austin, USA.
Moua, B and Russell, J S (2001) Comparison of two maintainability programs. Journal of Construction Engineering and Management, 127(3), pp. 239-244. ISSN 0733-9364
Murray, M D; Tookey, J E; Langford, D A and Hardcastle, C (2000) Project communication variables: A comparative study of us and UK construction industry perceptions. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Naji, K K (1997) The development of a virtual environment for simulating equipment-based construction operations in real-time object-oriented systems. PhD thesis, University of Florida, USA.
Neuman, Y; Alves, T D C L; Walsh, K D and Needy, K L (2015) Quantitative analysis of supplier quality surveillance practices in EPC projects. Journal of Construction Engineering and Management, 141(11): 04015039, ISSN 0733-9364
O'Connor, J T; Torres, N and Woo, J (2016) Sustainability actions during the construction phase. Journal of Construction Engineering and Management, 142(7): 4016016, ISSN 0733-9364
O'Sullivan, D T J (2005) Improving building performance by tracking performance metrics using an IFC data model. PhD thesis, University College Cork, Ireland.
Okoye, P U; Okolie, K C and Odesola, I A (2022) Risks of implementing sustainable construction practices in the Nigerian building industry. Construction Economics and Building, 22(1), pp. 21-46. ISSN 2204-9029
Oyetunji, A A and Anderson, S D (2006) Relative effectiveness of project delivery and contract strategies. Journal of Construction Engineering and Management, 132(1), pp. 3-13. ISSN 0733-9364
Patil, S S (2000) Optimal owner contractor relationships based on capital project competencies. PhD thesis, Texas A&M University, USA.
Perrenoud, A J (2020) Delphi approach to identifying best practices for succession planning within construction firms. International Journal of Construction Education and Research, 16(3), pp. 197-210. ISSN 1557-8771
Pishdad-Bozorgi, P; De La Garza, J M and Austin, R B (2016) Readiness assessment for flash tracking. Journal of Construction Engineering and Management, 142(12): 06016005, ISSN 0733-9364
Radtke, M W and Russell, J S (1993) Project-level model process for implementing constructability. Journal of Construction Engineering and Management, 119(4), pp. 813-831. ISSN 0733-9364
Raheem, A A; Falola, O O and Adeyeye, K J (2012) Production and testing of lateritic interlocking blocks. Journal of Construction in Developing Countries, 17(1), pp. 35-50. ISSN 1823-6499
Shan, Y; Goodrum, P M; Zhai, D; Haas, C and Caldas, C H (2011) The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), pp. 305-316. ISSN 1466433X
Shokri, S; Ahn, S; Lee, S; Haas, C T and Haas, R C G (2016) Current status of interface management in construction: Drivers and effects of systematic interface management. Journal of Construction Engineering and Management, 142(2): 04015070, ISSN 0733-9364
Shrestha, B K (2021) Relationship between standardization critical success factors (CSFs) and project performance. PhD thesis, University of Nevada, Las Vegas, USA.
Sindhu, J; Choi, K; Lavy, S; Rybkowski, Z K; Bigelow, B F and Li, W (2018) Effects of front-end planning under fast-tracked project delivery systems for industrial projects. International Journal of Construction Education and Research, 14(3), pp. 163-178. ISSN 1557-8771
Son, J; O'Brien, W J and Thomas, S R (2022) Recommended practices for effective management of academia-industry collaborative research teams in construction management. Journal of Construction Engineering and Management, 148(8): 04022075, ISSN 0733-9364
Son, Junghye (2013) Key process attributes and success factors for collaborative academia-industry research in construction industry project management. PhD thesis, University of Texas at Austin, USA.
Srour, I M (2005) A linear programming approach to optimize strategic investment in the construction workforce. PhD thesis, University of Texas at Austin, USA.
Suk, Sung Joon (2012) Analysis of project management attributes for the successful delivery of capital facility projects. PhD thesis, University of Texas at Austin, USA.
Thomas, S R (1996) An assessment tool for improving project team communications. PhD thesis, University of Texas at Austin, USA.
Thomas, S R; Lee, S H; Spencer, J D; Tucker, R L and Chapman, R E (2004) Impacts of design/information technology on project outcomes. Journal of Construction Engineering and Management, 130(4), pp. 586-597. ISSN 0733-9364
Thomas, S R; Tucker, R L and Kelly, W R (1998) Critical communications variables. Journal of Construction Engineering and Management, 124(1), pp. 58-66. ISSN 0733-9364
Tucker, R L (2007) Construction industry institute. Journal of Construction Engineering and Management, 133(9), pp. 640-643. ISSN 0733-9364
Walker, D H T and Vines, M W (1997) Construction time performance in multi-unit residential construction: Insight into the role of procurement methods. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(3), pp. 278-284. ISSN 0969-9988
Wang, Y (2017) Zero incident safety management for continued safety improvement. PhD thesis, Polytechnic Institute of New York University, USA.
Wang, Y; Lin, M; Xu, K; Zhang, S and Ma, H (2021) Energy consumption analysis of glass house using electrochromic window in the subtropical region. Journal of Engineering, Design and Technology, 19(1), pp. 203-218. ISSN 1726-0531
Wang, Y-R (2002) Applying the PDRI in project risk management. PhD thesis, University of Texas at Austin, USA.
Waters, J; Neale, R; Hutson, S and Mears, K (2004) Personal safety on university campuses: Defining personal safety using the delphi method. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Wehle, A J (2014) Taxonometric model for using leading safety indicators in the construction industry. PhD thesis, University of Florida, USA.
Xue, X; Tan, X and Fan, H (2026) Mapping the trajectories of digital technology innovation in the construction industry: An integrated spnp and louvain approach. Engineering, Construction and Architectural Management, 33(1), pp. 477-508. ISSN 0969-9988
Yates, J K (2014) Design and construction for sustainable industrial construction. Journal of Construction Engineering and Management, 140(4): B4014005, ISSN 0733-9364
Yussef, A K (2019) Assessing the maturity and accuracy of front end engineering design (FEED) for large, complex industrial projects. PhD thesis, Arizona State University, USA.
Zhai, D; Goodrum, P M; Haas, C T and Caldas, C H (2009) Relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering and Management, 135(8), pp. 746-753. ISSN 0733-9364
Zou, Y and Lee, S H (2008) The impacts of change management practices on project change cost performance. Construction Management and Economics, 26(4), pp. 387-393. ISSN 1466433X
de La Garza, J M; Hancher, D E and Decker, L (1998) Analysis of safety indicators in construction. Journal of Construction Engineering and Management, 124(4), pp. 312-314. ISSN 0733-9364
Up a level