Items with Subject: quantity surveying
Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193
Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599
Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects. PhD thesis, University of the West of England, Bristol, UK.
Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599
Akintoye, A; Bowen, P and Hardcastle, C (1998) Macro-economic leading indicators of construction contract prices. Construction Management and Economics, 16(2), pp. 159-175. ISSN 01446193
Akintoye, S A (1991) Construction tender price index: modelling and forecasting trends. PhD thesis, University of Salford, UK.
Akintoye, S A and Skitmore, R M (1994) A comparative analysis of three macro price forecasting models. Construction Management and Economics, 12(3), pp. 257-270. ISSN 01446193
Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.
Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.
Aminbakhsh, A and Sonmez, R (2015) Pareto oriented optimization of discrete time-cost trade-off problem using particle swarm optimization. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Aminbakhsh, S (2018) Heuristic and exact methods for the large-scale discrete time-cost trade-off problems. PhD thesis, Middle East Technical University, Turkey.
Ammar, M A (2011) Optimization of project time-cost trade-off problem with discounted cash flows. Journal of Construction Engineering and Management, 137(1), pp. 65-71. ISSN 0733-9364
Ammar, M A (2020) Efficient modeling of time-cost trade-off problem by eliminating redundant paths. International Journal of Construction Management, 20(7), pp. 812-821. ISSN 1562-3599
An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988
Anugwo, I C; Shakantu, W; Saidu, I and Adamu, A (2018) Potentiality of the South African construction smme contractors globalising within and beyond the SADC construction markets. Journal of Construction Business and Management, 2(1), pp. 41-49. ISSN 2521-0165
Arditi, D and Suh, K (1991) Estimating system selection expert. Construction Management and Economics, 9(4), pp. 369-381. ISSN 01446193
Besiktepe, D; Sparkling, A; Debs, L and Manuel, R (2024) Digital technology applications in construction education: A systematic review of methodological pluralism. International Journal of Construction Education and Research, 20(4), pp. 421-443. ISSN 1557-8771
Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.
Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193
Buser, M and Carlsson, V (2015) Renewing renovation: Looking at renovation of owners occupied houses with socio-materiality lenses. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Buser, M and Carlsson, V (2017) What you see is not what you get: Single-family house renovation and energy retrofit seen through the lens of sociomateriality. Construction Management and Economics, 35(5), pp. 276-287. ISSN 01446193
Bynum, P; Issa, R R A and Olbina, S (2013) Building information modeling in support of sustainable design and construction. Journal of Construction Engineering and Management, 139(1), pp. 24-34. ISSN 0733-9364
Chau, K W (1998) The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong. Engineering, Construction and Architectural Management, 5(1), pp. 38-50. ISSN 0969-9988
Chau, K W and Walker, A (1988) The measurement of total factor productivity of the Hong Kong construction industry. Construction Management and Economics, 6(3), pp. 209-224. ISSN 01446193
Chen, L; Zhang, J and Peng, W (2022) Research on the hierarchical discrete time-cost trade-off problem for program. Journal of Construction Engineering and Management, 148(7): 04022039, ISSN 0733-9364
Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.
Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.
Choi, K; Lee, H W; Bae, J and Bilbo, D (2016) Time-cost performance effect of change orders from accelerated contract provisions. Journal of Construction Engineering and Management, 142(3): 04015085, ISSN 0733-9364
Cruywagen, J H H (2015) Towards the establishment of a relevant tender price index for the South African building industry. PhD thesis, University of Pretoria, South Africa.
Cusack, M M (1981) Time cost models: their use in decision making in the construction industry, with particular reference to the use of the microcomputer. PhD thesis, University of Bath, UK.
Dakhil, A J (2017) Building information modelling (BIM) maturity-benefits assessment relationship framework for UK construction clients. PhD thesis, University of Salford, UK.
Dehghan, R and Ruwnapura, J Y (2014) Model of trade-off between overlapping and rework of design activities. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364
Dursun, O and Stoy, C (2011) Time-cost relationship of building projects: Statistical adequacy of categorization with respect to project location. Construction Management and Economics, 29(1), pp. 97-106. ISSN 1466433X
El-Sayegh, S M and Al-Haj, R (2017) A new framework for time-cost trade-off considering float loss impact. Journal of Financial Management of Property and Construction, 22(1), pp. 20-36. ISSN 1366-4387
Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364
Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2007) Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), pp. 86-90. ISSN 0733-9364
Ernest, K; Theophilus, A K; Amoah, P and Emmanuel, B B (2019) Identifying key economic indicators influencing tender price index prediction in the building industry: A case study of Ghana. International Journal of Construction Management, 19(2), pp. 106-112. ISSN 1562-3599
Eshtehardian, E; Afshar, A and Abbasnia, R (2008) Time-cost optimization: Using GA and fuzzy sets theory for uncertainties in cost. Construction Management and Economics, 26(7), pp. 679-691. ISSN 1466433X
Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364
Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364
Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988
Fazeli, A; Dashti, M S; Jalaei, F and Khanzadi, M (2021) An integrated BIM-based approach for cost estimation in construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2828-2854. ISSN 0969-9988
Fitzgerald, E and Akintoye, A (1995) The accuracy and optimal linear correction of UK construction tender price index forecasts. Construction Management and Economics, 13(6), pp. 493-500. ISSN 01446193
Geem, Z W (2010) Multiobjective optimization of time-cost trade-off using harmony search. Journal of Construction Engineering and Management, 136(6), pp. 711-716. ISSN 0733-9364
Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.
Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364
Goh, B H (1997) Construction demand modelling: a systematic approach to using economic indicators and a comparative study of alternative forecasting approaches. PhD thesis, University College London, UK.
Goh, B H (2016) Designing a whole-life building cost index in Singapore. Built Environment Project and Asset Management, 6(2), pp. 159-173. ISSN 2044-124X
Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X
Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.
H M, C S (2018) Impact of construction practices on sustainable environment: a study at Bangalore. PhD thesis, Shri Jagdishprasad Jhabarmal Tibarewala University, India.
Han, T; Zhou, G; Xie, Y; Qiao, F; Feng, J; Liu, P and Wang, S (2026) Time-cost trade-off optimization in ultralong tunnel construction based on working face planning. Journal of Construction Engineering and Management, 152(3): 04026007, ISSN 0733-9364
Haron, A T (2013) Organisational readiness to implement building information modelling: a framework for design consultants in Malysia. PhD thesis, University of Salford, UK.
Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193
Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364
Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364
Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364
Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X
Jafary, P.; Shojaei, D.; Rajabifard, A. and Ngo, T. (2026) AI-augmented construction cost estimation: An ensemble natural language processing (NLP) model to align quantity take-offs with cost indexes. International Journal of Construction Management, 26(8), pp. 1508-1526. ISSN 1562-3599
Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599
Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193
Kenley, R (2001) The predictive ability of bromilow's time-cost model: A comment. Construction Management and Economics, 19(8), pp. 759-764. ISSN 01446193
Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.
Kissi, E; Adjei-Kumi, T; Amoah, P and Gyimah, J (2018) Forecasting construction tender price index in Ghana using autoregressive integrated moving average with exogenous variables model. Construction Economics and Building, 18(1), pp. 70-82. ISSN 2204-9029
Kissi, E; Adjei-Kumi, T; Badu, E and Boateng, E B (2017) Factors affecting tender price in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 22(3), pp. 252-268. ISSN 1366-4387
Kumaraswamy, M M and Chan, D W M (1995) Determinants of construction duration. Construction Management and Economics, 13(3), pp. 209-217. ISSN 01446193
Li, H; Cao, J N and Love, P E D (1999) Using machine learning and GA to solve time-cost trade-off problems. Journal of Construction Engineering and Management, 125(5), pp. 347-353. ISSN 0733-9364
Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364
Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X
Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Liu, J and Rahbar, F (2004) Project time-cost trade-off optimization by maximal flow theory. Journal of Construction Engineering and Management, 130(4), pp. 607-609. ISSN 0733-9364
Lohne, J; Kjesbu, N E; Engebø, A; Young, B and Lædre, O (2019) Scoping literature review of crime in the AEC industry. Journal of Construction Engineering and Management, 145(6): 03119002, ISSN 0733-9364
Mak, M Y; Ng, S T; Chen, S E and Varnam, M (2000) The relationship between economic indicators and Bromilow's time-cost model: A pilot study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Marzouk, M; Said, H and El-Said, M (2009) Framework for multiobjective optimization of launching girder bridges. Journal of Construction Engineering and Management, 135(8), pp. 791-800. ISSN 0733-9364
Meléndez, W; Saavedra, R; Garcés, G and Herrera, R (2026) Comparative analysis of quantity take-off in reinforcing steel bars in apartment buildings based on CAD and BIM method: A case study. International Journal of Construction Management, 26(5), pp. 751-771. ISSN 1562-3599
Moselhi, O and Ei-Rayes, K (1993) Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, 119(4), pp. 681-697. ISSN 0733-9364
Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175
Moussavi Nadoushani, Zahra Sadat (2018) A computational approach for estimating and minimizing construction-related and end-of-life carbon footprint of concrete structures. PhD thesis, University of New South Wales, Australia.
Moussourakis, J and Haksever, C (2010) Project compression with nonlinear cost functions. Journal of Construction Engineering and Management, 136(2), pp. 251-259. ISSN 0733-9364
Naji, K K; Gunduz, M and Hamaidi, M F (2022) Major factors affecting construction waste management in infrastructure projects using structural equation model. Journal of Construction Engineering and Management, 148(10): 04022101, ISSN 0733-9364
Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193
Ng, S T; Mak, M M Y; Skitmore, R M; Lam, K C and Varnam, M (2001) The predictive ability of bromilow's time-cost model. Construction Management and Economics, 19(2), pp. 165-173. ISSN 01446193
Nguyen, T Q; Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(4), pp. 704-728. ISSN 23984708
O'Brien, W J and Fischer, M A (2000) Importance of capacity constraints to construction cost and schedule. Journal of Construction Engineering and Management, 126(5), pp. 366-373. ISSN 0733-9364
Ogunseiju, O; Odeyinka, H A and Yusuf, A O (2023) Usage of building information modelling in quantity surveying firms in Nigeria. Journal of Construction Business and Management, 6(2), pp. 27-37. ISSN 2521-0165
Ogunsemi, D R and Jagboro, G O (2006) Time-cost model for building projects in Nigeria. Construction Management and Economics, 24(3), pp. 253-258. ISSN 01446193
Olomolaiye, A and Egbu, C (2004) The significance of human resource issues in knowledge management within the construction industry: People, problems and possibilities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.
Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364
Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.
Pham, V H S; Nguyen Dang, N T and Nam, N V (2025) Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning. Engineering, Construction and Architectural Management, 32(7), pp. 4852-4886. ISSN 0969-9988
Rathnayake, A P (2021) A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates. PhD thesis, University of Salford, UK.
Reda, R and Carr, R I (1989) Time-cost trade-off among related activities. Journal of Construction Engineering and Management, 115(3), pp. 475-486. ISSN 0733-9364
Ren, S; Qiang, G; Tang, S; Zhang, C; Hyung-Joon, S and Wu, K (2024) An automatic design-feedback process for structural prefabricated components quantity take-off calculation using BIM. Architectural Engineering and Design Management, 20(2), pp. 287-302. ISSN 1745-2007
Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988
Sayed, Ahmed Yehia Abdel Aziz El (2025) Design of novel formwork system and development of numerical model for comparison between formwork systems. PhD thesis, The American University in Cairo, Egypt.
Selinger, S and Stamler, H (1983) Computerized method for quantity surveying. Construction Management and Economics, 1(1), pp. 75-87. ISSN 01446193
Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364
Shakantu, W; Tookey, J E and Bowen, P A (2003) The hidden cost of transportation of construction materials: An overview. Journal of Engineering, Design and Technology, 1(1), pp. 103-118. ISSN 1726-0531
Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.
Sierra, F and Rodboonpha, C (2023) Building information modelling implementation models in Thailand: Drivers, benefits, barriers and lessons learned. Journal of Construction in Developing Countries, 28(2), pp. 37-55. ISSN 1823-6499
Sing, M C P; Luk, S Y Y; Chan, K H C; Liu, H J and Humphrey, R (2024) Scan-to-BIM technique in building maintenance projects: Practicing quantity take-off. International Journal of Building Pathology and Adaptation, 42(6), pp. 1250-1262. ISSN 2398-4708
Sonmez, R; Aminbakhsh, S and Atan, T (2020) Activity uncrashing heuristic with noncritical activity rescheduling method for the discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 146(8): 1870, ISSN 0733-9364
Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364
Stanley, R and Thurnell, D (2014) The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Construction Economics and Building, 14(1), pp. 105-117. ISSN 2204-9029
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Tanko, B L; Zakka, W P and Heng, W N (2024) BIM in the Malaysian construction industry: A scientometric review and case study. Engineering, Construction and Architectural Management, 31(3), pp. 1165-1186. ISSN 0969-9988
Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599
Toh, S C L; Wong, S Y and Ding, C S (2026) The impact of artificial intelligence on the quantity surveying profession in sarawak, Malaysia. Journal of Engineering, Design and Technology, 24(1), pp. 171-192. ISSN 1726-0531
Toǧan, V; Sulub, A S; Eirgash, M A and Mostofi, F (2026) Project scheduling to minimize the time and cost in large-scale construction projects with repulsion-based improved arithmetic optimization. Journal of Construction Engineering and Management, 152(3): 04025277, ISSN 0733-9364
Turkoglu, H; Arditi, D and Polat, G (2023) Mathematical multiobjective optimization model for trade-offs in small-scale construction projects. Journal of Construction Engineering and Management, 149(7): 04023056, ISSN 0733-9364
Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364
Turkoglu, H; Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(4), pp. 619-628. ISSN 1562-3599
Victoria, M F; Perera, S; Davies, A and Fernando, N (2017) Carbon and cost critical elements: A comparative analysis of two office buildings. Built Environment Project and Asset Management, 7(5), pp. 460-470. ISSN 2044-124X
Wang, J; Huang, W and Chen, Y (2025) Solving stochastic time-cost trade-off problems via modified double-loop procedure with adaptive domain decomposition method. Journal of Construction Engineering and Management, 151(2): 04024199, ISSN 0733-9364
Wang, P; Wang, K; Huang, Y and Fenn, P (2024) A contingency approach for time-cost trade-off in construction projects based on machine learning techniques. Engineering, Construction and Architectural Management, 31(11), pp. 4677-4695. ISSN 0969-9988
Wang, Z; Jia, L; Lv, J and Huang, J (2024) Minimization of rebar cutting waste using BIM and cutting pattern-oriented multiobjective optimization. Journal of Construction Engineering and Management, 150(11): 04024166, ISSN 0733-9364
Wong, J M W and Ng, S T (2010) Forecasting construction tender price index inm Hong Kong using vector error correction model. Construction Management and Economics, 28(12), pp. 1255-1268. ISSN 1466433X
Xiong, Y and Kuang, Y (2008) Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off. Journal of Construction Engineering and Management, 134(2), pp. 153-156. ISSN 0733-9364
Yang, C (2004) Knowledge-based understanding and interpretation of construction engineering drawings. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Yang, I T (2007) Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis. Journal of Construction Engineering and Management, 133(7), pp. 498-505. ISSN 0733-9364
Yang, I T; Lin, Y C and Lee, H Y (2014) Use of support vector regression to improve computational efficiency of stochastic time-cost trade-off. Journal of Construction Engineering and Management, 140(1): 04013036, ISSN 0733-9364
Yap, J B H; Abdul-Rahman, H and Wang, C (2018) Preventive mitigation of overruns with project communication management and continuous learning: PLS-SEM approach. Journal of Construction Engineering and Management, 144(5): 4018025, ISSN 0733-9364
Yap, J B H and Skitmore, M (2018) Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), pp. 218-238. ISSN 1745-2007
Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599
Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.