Items with Subject: quantitative and statistical methods

Number of items: 27.

Abdel-Wahab, M S (2008) An examination of the relationship between skills development and productivity in the construction industry. PhD thesis, Loughborough University, UK.

Abdel-Wahab, M S; Dainty, A R J and Ison, S G (2006) How productive is the construction industry? In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ahmad, S B S; Mazhar, M U; Bruland, A; Andersen, B S; Langlo, J A and Torp, O (2020) Labour productivity statistics: A reality check for the Norwegian construction industry. International Journal of Construction Management, 20(1), pp. 39-52. ISSN 1562-3599

Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. PhD thesis, University of California, Berkeley, USA.

Alzubi, K M; Alkhateeb, A M and Hiyassat, M A (2023) Factors affecting the job satisfaction of construction engineers: Evidence from Jordan. International Journal of Construction Management, 23(2), pp. 319-328. ISSN 1562-3599

Briscoe, G (2006) How useful and reliable are construction statistics? Building Research & Information, 34(3), pp. 220-229. ISSN 0961-3218

Cannon, J (1994) Lies and construction statistics. Construction Management and Economics, 12(4), pp. 307-313. ISSN 01446193

Chia, F C; Skitmore, M; Runeson, G and Bridge, A (2014) Economic development and construction productivity in Malaysia. Construction Management and Economics, 32(9), pp. 874-887. ISSN 01446193

Chiu, W-Y B (2011) Job satisfaction and organizational commitment amongst quantity surveyors in Hong Kong: an attitudinal perspective. PhD thesis, University of Hong Kong, Hong Kong.

Emuze, F A (2011) Performance improvement in South African construction. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

Goh, B H (2016) Designing a whole-life building cost index in Singapore. Built Environment Project and Asset Management, 6(2), pp. 159-173. ISSN 2044-124X

Gruneberg, S (2008) Modelling the UK built infrastructure market using gross fixed capital formation. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Gruneberg, S and Folwell, K (2013) The use of gross fixed capital formation as a measure of construction output. Construction Management and Economics, 31(4), pp. 359-368. ISSN 1466433X

Gruneberg, S and Hughes, W P (2005) UK construction orders and output: A comparison of government and commercially available data 1995-2001. Journal of Financial Management of Property and Construction, 10(2), pp. 83-94. ISSN 1366-4387

Haugbølle, K; Larsen, J N and Nielsen, J (2019) Construction productivity revisited: Towards measuring performance of construction output. Engineering, Construction and Architectural Management, 26(5), pp. 794-813. ISSN 0969-9988

Ho, P (2012) Comparison of the grey model and the box jenkins model in forecasting manpower in the UK construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ketabi, A B and Heravi, G (2022) Developing a framework for evaluating construction project safety levels and optimal cost allocation to safety influential factors. Engineering, Construction and Architectural Management, 29(2), pp. 643-668. ISSN 0969-9988

Masitenyane, L A (2020) Dimensions and outcomes of buyer-seller relationship intentions for concrete products in the construction environment. DTech thesis, Vaal University of Technology, South Africa.

McCluskey, W J; Zulkarnain, D D and Kamarudin, N (2014) Boosted regression trees: An application for the mass appraisal of residential property in Malaysia. Journal of Financial Management of Property and Construction, 19(2), pp. 152-167. ISSN 1366-4387

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988

Oral, E L and Mstkolu, G (2000) Current state of Turkish prefabrication companies with respect to the applicability of just in time. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Owusu-Manu, D-G; John, E D; Adesi, M; Badu, E and Love, P E D (2016) Attaining fairness in construction cost consultancy pricing services: A case study in Ghana. Journal of Engineering, Design and Technology, 14(4), pp. 699-712.

Shurrab, M; Abbasi, G and Al Khazaleh, R (2018) Evaluating the effect of motivational dimensions on the construction project managers in Jordan. Engineering, Construction and Architectural Management, 25(3), pp. 412-424. ISSN 0969-9988

Sing, C P; Love, P E D and Tarn, C M (2012) Multiplier model for forecasting manpower demand. Journal of Construction Engineering and Management, 138(10), pp. 1161-1168. ISSN 0733-9364

Walsh, K D; Sawhney, A and Vachris, M A (2006) Improving inter-spatial comparison of construction costs. Engineering, Construction and Architectural Management, 13(2), pp. 123-135. ISSN 0969-9988

Wang, C; Zhang, S; Gao, Y and Li, B (2022) Trust repair in the aftermath of conflict occurrence in construction subcontracting: An intergroup contact perspective. Construction Management and Economics, 40(10), pp. 781-795. ISSN 01446193

Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: New methodology and old problems. Construction Management and Economics, 29(7), pp. 653-658. ISSN 1466433X

This list was generated on Sat Aug 22 02:31:47 2026 UTC.