Items with Subject: project delivery

Number of items: 4155.

Abad, F and Naeni, L M (2020) A hybrid framework to assess the risk of change in construction projects using fuzzy fault tree and fuzzy event tree analysis. International Journal of Construction Management, 22(12), pp. 2385-2397. ISSN 1562-3599

Abadi, M and Sammuneh, M A (2020) Integrating circular economy and constructability research: An initial development of a lifecycle "circularity" assessment framework and indicators. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364

Abbasi, M H (2024) Phasing out fossil fuel heating in UK homes: A multi-dimensional framework for sustainability assessment of alternatives and their lifecycle implications. PhD thesis, Liverpool John Moores University, UK.

Abbasi, Mostafa (2017) Enhance the construction industry performance through lean applications. PhD thesis, Politecnico di Milano, Italy.

Abbasianjahromi, H and Aghakarimi, M (2023) Safety performance prediction and modification strategies for construction projects via machine learning techniques. Engineering, Construction and Architectural Management, 30(3), pp. 1146-1164. ISSN 0969-9988

Abd Jamil, A H and Fathi, M S (2018) Contractual challenges for BIM-based construction projects: A systematic review. Built Environment Project and Asset Management, 8(4), pp. 372-385. ISSN 2044-124X

Abdal Noor, B and Yi, S (2018) Review of BIM literature in construction industry and transportation: meta-analysis. Construction Innovation, 18(4), pp. 433-452. ISSN 1471-4175

Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City. PhD thesis, University of Newcastle upon Tyne, UK.

Abdalla, S B; Mushtaha, E; Rashid, M; Opoku, A; Hamad, R; Dweiri, F and Elmualim, A (2023) Pre-design CSFs (critical success factors) of building projects for dubai's development boom. Built Environment Project and Asset Management, 13(3), pp. 359-374. ISSN 2044-124X

Abdalla-Salem, S B (2009) Computer-aided planning and building process. PhD thesis, Technische Universitaet Berlin, Germany.

Abdallah, A; Doloi, H and Holzer, D (2025) Exploring contextual issues impacting delivery and performance of public sector construction projects in Tanzania. Built Environment Project and Asset Management, 15(2), pp. 228-246. ISSN 2044-124X

Abdeen, F N; Gunatilaka, R N; Sepasgozar, S M E and Edwards, D J (2024) The usability of a novel mobile augmented reality application for excavation process considering safety and productivity in construction. Construction Innovation, 24(4), pp. 892-911. ISSN 1471-4175

Abdel Aziz, A M (2007) A survey of the payment mechanisms for transportation DBFO projects in British columbia. Construction Management and Economics, 25(5), pp. 529-543. ISSN 1466433X

Abdel-Razek, R H (1998) Factors affecting construction quality in Egypt: Identification and relative importance. Engineering, Construction and Architectural Management, 5(3), pp. 220-227. ISSN 0969-9988

Abdel-Razek, R H (1998) Quality improvement in Egypt: Methodology and implementation. Journal of Construction Engineering and Management, 124(5), pp. 354-360. ISSN 0733-9364

Abdelghani, Mohammad (2021) Towards a generalized value stream mapping and domain ontology to support the enabling of industry 4.0 in construction. PhD thesis, University of Alberta, Canada.

Abdirad, H (2020) Developing digital project delivery routines around frequent disruptions: How do AEC organizations respond to disruptive information exchange requirements? PhD thesis, University of Washington, USA.

Abdirad, H and Nazari, A (2015) Barriers to effective implementation of quality management systems in public design projects in Iran. Architectural Engineering and Design Management, 11(6), pp. 457-474. ISSN 1745-2007

Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects. PhD thesis, Oklahoma State University, USA.

Abdou, A; Lewis, J and Radaideh, M (2003) An internet-based decision support system for healthcare project appraisal: A conceptual proposal. Construction Innovation, 3(3), pp. 145-155. ISSN 1471-4175

Abdul Ghafar, M and Ibrahim, R (2025) Quantifying AEC professionals' cross-work culture productivity: Comparison between Malaysian and UK projects during industrialized building project. Smart and Sustainable Built Environment, 14(4), pp. 921-942. ISSN 2046-6099

Abdul Nabi, M and El-Adaway, I H (2021) Risk-based approach to predict the cost performance of modularization in construction projects. Journal of Construction Engineering and Management, 147(10): 04021133, ISSN 0733-9364

Abdul Nifa, F A (2013) Development of a framework for partnering through aligning organizational cultures in the Malaysian construction industry. PhD thesis, University of Salford, UK.

Abdul-Lateef, O A (2010) Quantitative analysis of criteria in university building maintenance in Malaysia. Construction Economics and Building, 10(3), pp. 51-61. ISSN 2204-9029

Abdul-Rahman, H (1995) The cost of non-conformance during a highway project: A case study. Construction Management and Economics, 13(1), pp. 23-32. ISSN 01446193

Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193

Abdul-Rahman, H; Berawi, M A; Berawi, A R; Mohamed, O; Othman, M and Yahya, I A (2006) Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management, 132(2), pp. 125-133. ISSN 0733-9364

Abdullah, A H; Yaman, S K; Mohammad, H and Hassan, P F (2018) Construction manager's technical competencies in Malaysian construction projects. Engineering, Construction and Architectural Management, 25(2), pp. 153-177. ISSN 0969-9988

Abdullah, R Z (1988) Integrated systems for site management. PhD thesis, Loughborough University, UK.

Abdullah Habib, S N H (2017) Critical success factors and contractual risks for Private Finance 2 projects implementing building information modelling. PhD thesis, University of Salford, UK.

Abdullahi, B; Ibrahim, Y M; Ibrahim, A and Bala, K (2020) Development of e-tendering evaluation system for Nigerian public sector. Journal of Engineering, Design and Technology, 18(1), pp. 122-149. ISSN 1726-0531

Abdullahi, B; Ibrahim, Y M; Ibrahim, A D and Bala, K (2022) Development of web-based e-tendering system for Nigerian public procuring entities. International Journal of Construction Management, 22(2), pp. 278-291. ISSN 1562-3599

Abdullahi, U; Bustani, S A; Hassan, A and Rotimi, F E (2019) Assessing quality management practice in Nigerian construction industry. Journal of Construction Business and Management, 3(2), pp. 17-25. ISSN 2521-0165

Abdullahi Ahmed, U; Noor Amila Wan Abdullah, Z and Abdul-Rashid, A-A (2021) Malaysian regulators' ranking of PPP contract governance skills. Built Environment Project and Asset Management, 11(1), pp. 88-102. ISSN 2044-124X

Abdullatif, M I (1992) A system for quality-related costs for construction projects. PhD thesis, University of Kansas, USA.

Abed, A; Ali, H; Ibrahim, A and Wedyan, M (2023) Impact of setbacks on thermal comfort and visual privacy in detached houses in Jordan. Building Research & Information, 51(4), pp. 446-458. ISSN 0961-3218

Abeysekera, V and Shelke, M (2018) Construction as biological cells: An exploratory study. International Journal of Construction Management, 18(4), pp. 276-292. ISSN 1562-3599

Abideen, D; Yunusa-Kaltungo, A; Manu, P and Cheung, C (2023) Expert verification of information requirements for integrating building information modelling with operation and maintenance. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Aboagye-Nimo, E and Raidén, A B (2019) Challenging standardisation by embracing ambiguities of site safety: The case of micro construction firms. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Abolghasemi, M.; Al-Mhdawi, M. K. S.; Rahimian, F. and Qazi, A. (2026) Exploring the nexus of stakeholder management, project performance and stakeholder satisfaction in Malaysian residential building projects: A PLS-SEM approach. Engineering, Construction and Architectural Management, 33(3), pp. 2089-2117. ISSN 0969-9988

Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.

Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988

Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.

AbouMoemen, A A (2022) A BIM maturity-KPI assessment framework for a UK public sector local authority client. PhD thesis, University of Salford, UK.

Abraham, D M (1990) A state-based framework using indicators for construction monitoring and evaluation. PhD thesis, University of Maryland, College Park, USA.

Abruzzini, A and Abrishami, S (2022) Integration of BIM and advanced digital technologies to the end of life decision-making process: A paradigm of future opportunities. Journal of Engineering, Design and Technology, 20(2), pp. 388-413. ISSN 1726-0531

Abu Arqoub, Muath (2022) Measuring end-user delight: Is success in project design and delivery enough? PhD thesis, Bond University, Australia.

Abu Awwad, K (2020) The implementation of building information modelling Level 2 in the UK construction industry: the case of small and medium enterprises. PhD thesis, Coventry University, UK.

Abu Samra, S; Ahmed, M; Hammad, A and Zayed, T (2018) Multiobjective framework for managing municipal integrated infrastructure. Journal of Construction Engineering and Management, 144(1): 04017091, ISSN 0733-9364

AbulHassan, H S (2001) A framework for applying concurrent engineering principles to the construction industry. PhD thesis, Pennsylvania State University, USA.

Aburas, M (2020) Critical success factors for implementing ISO 9001 in UK construction projects. PhD thesis, University of Salford, UK.

Abusalem, O (2020) Towards last planner system implementation in Gaza Strip, Palestine. International Journal of Construction Management, 20(5), pp. 367-384. ISSN 1562-3599

Acosta, D (1986) Application of production planning methods to improve productivity: Issues from the Venezuelan construction industry. PhD thesis, University of California, Berkeley, USA.

Adabre, M A and Chan, A P C (2020) Towards a sustainability assessment model for affordable housing projects: The perspective of professionals in Ghana. Engineering, Construction and Architectural Management, 27(9), pp. 2523-2551. ISSN 0969-9988

Adam, A and Lindahl, G (2017) Applying the dynamic capabilities framework in the case of a large public construction client. Construction Management and Economics, 35(7), pp. 420-431. ISSN 01446193

Adamtey, S and Onsarigo, L (2018) Analysis of pipe-bursting construction risks using probability-impact model. Journal of Engineering, Design and Technology, 16(3), pp. 461-477. ISSN 1726-0531

Adamtey, S A (2021) A case study performance analysis of design-build and integrated project delivery methods. International Journal of Construction Education and Research, 17(1), pp. 68-84. ISSN 1557-8771

Adebisi, E O; Alao, O O and Ojo, S O (2020) Assessment of early warning signs predisposing building projects to failure in Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1403-1423. ISSN 1726-0531

Adebisi, E O; Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(2), pp. 210-231. ISSN 23984708

Adedeji, J A; Fadamiro, J A and Odeyale, T O (2020) Design toolkits for campus open spaces from post-occupancy evaluations of federal universities in South-West Nigeria. Built Environment Project and Asset Management, 10(2), pp. 296-311. ISSN 2044-124X

Adekunye, O J and Oke, A E (2023) Applicable areas of biomimicry principles for sustainable construction in Nigeria. Construction Innovation, 23(4), pp. 713-732. ISSN 1471-4175

Adenuga, O A (2008) Evaluation of maintenance management practice in public hospital, buildings in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.

Adewunmi, O A; Ibem, E and Amole, D (2014) Satisfaction of first-time residential clients with architectural services. Journal of Engineering, Design and Technology, 12(3), pp. 316-335.

Adibfar, A (2020) Bridge digital twins: Fusion of intelligent transportation systems (ITS) sensor data and bridge information modeling (BRIM) for interoperability. PhD thesis, University of Florida, USA.

Adinyira, E; Agyekum, K; Danku, J C; Addison, P and Kukah, A S (2020) Influence of subcontractor risk management on quality performance of building construction projects in Ghana. Journal of Construction in Developing Countries, 25(2), pp. 175-197. ISSN 1823-6499

Adu, E T and Opawole, A (2020) Assessment of performance of teamwork in construction projects delivery in South-Southern Nigeria. Journal of Engineering, Design and Technology, 18(1), pp. 230-250. ISSN 1726-0531

Adu Gyamfi, T; Aigbavboa, C O and Thwala, W D (2024) Risk resources management influence on public-private partnership risk management in construction industry: Confirmatory factor analysis approach. Journal of Engineering, Design and Technology, 22(5), pp. 1544-1569. ISSN 1726-0531

Adu-Amankwa, N. A. N. and Rahimian, F. (2026) Harnessing blockchain-enabled digital twins for building commissioning: Examining practitioners' perspectives. Engineering, Construction and Architectural Management, 33(3), pp. 1891-1906. ISSN 0969-9988

Afful, A E; Ayarkwa, J; Acquah, G K K; Baah, B; Adjei, E K; Oduro, S and Asiedu-Ampem, G (2026) Towards the delivery of environmentally sustainable buildings in Ghana: Drivers of capacity building. International Journal of Construction Education and Research, 22(1), pp. 27-52. ISSN 1557-8771

Afful, A E; Ayarkwa, J; Acquah, G K K and Osei-Asibey, D (2023) Enablers of incorporating indoor environmental quality (IEQ) principles into buildings. Smart and Sustainable Built Environment, 12(1), pp. 38-59. ISSN 2046-6099

Afieroho, P (2024) Project management by the people, for the people, and of the people: Context, challenges, and prospects for adoption of e-government tools to monitor execution of public infrastructure projects in Nigeria. PhD thesis, University of Alaska Fairbanks, USA.

Afzal, Muneeb (2024) Improving request for information (RFI) processing in construction projects using natural language processing (NLP) techniques. PhD thesis, University of Technology Sydney, Australia.

Agbaxode, P D K (2022) A framework to improve design documentation quality using integrated project delivery (IPD) approach. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Agbaxode, P D K; Saghatforoush, E and Dlamini, S (2020) Integrated project delivery (IPD): Projecting a common good to key participants and the project. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Agbaxode, P D K; Saghatforoush, E and Dlamini, S (2025) Capabilities required of the conventional project delivery (CPD) approach in producing quality design documentation: The Ghanaian construction industry perspective. Journal of Engineering, Design and Technology, 23(2), pp. 682-701. ISSN 1726-0531

Agbaxode, P D K; Saghatforoush, E; Dlamini, S and Korsah, J K (2024) Integrated project delivery enablers to enhance conventional project delivery toward improving design documentation quality. Built Environment Project and Asset Management, 14(6), pp. 817-834. ISSN 2044-124X

Aggor, K K (2017) Relationship between budget and project success factors in the Ghanaian building construction sector. PhD thesis, Walden University, USA.

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193

Aghimien, D; Aigbavboa, C O; Chan, D W M and Aghimien, E I (2024) Determinants of cloud computing deployment in South African construction organisations using structural equation modelling and machine learning technique. Engineering, Construction and Architectural Management, 31(3), pp. 1037-1060. ISSN 0969-9988

Aghimien, D; Ikuabe, M; Aliu, J; Aigbavboa, C; Oke, A E and Edwards, D J (2023) Empirical scrutiny of the behavioural intention of construction organisations to use unmanned aerial vehicles. Construction Innovation, 23(5), pp. 1075-1094. ISSN 1471-4175

Aghimien, D O; Aigbavboa, C O and Oke, A E (2020) Critical success factors for digital partnering of construction organisations: a Delphi study. Engineering, Construction and Architectural Management, 27(10), pp. 3171-3188. ISSN 0969-9988

Aghimien, D O; Aigbavboa, C O and Thwala, W D (2019) Microscoping the challenges of sustainable construction in developing countries. Journal of Engineering, Design and Technology, 17(6), pp. 1110-1128. ISSN 1726-0531

Aghimien, D O; Ikuabe, M; Aigbavboa, C; Oke, A and Shirinda, W (2021) Unravelling the factors influencing construction organisations' intention to adopt big data analytics in South Africa. Construction Economics and Building, 21(3), pp. 262-281. ISSN 2204-9029

Agu, C A (2020) Exploring the standards american executive leaders need to develop successful infrastructure projects in sub-saharan Africa. DM thesis, Colorado Technical University, USA.

Aguilar, A J; de la Hoz-Torres, M L; Oltra-Nieto, L; Ruiz, D P and Martínez-Aires, M D (2022) Impact of COVID-19 protocols on IEQ and students' perception within educational buildings in southern Spain. Building Research & Information, 50(7), pp. 755-770. ISSN 0961-3218

Aguocha, T (2023) Best practices for cost monitoring and control in construction projects: An exploratory case study. DBA thesis, National University, USA.

Agustí-Juan, I (2018) Sustainability assessment and development of guidelines for digital fabrication in construction. DSc thesis, ETH Zürich, Switzerland.

Agyekum, K; Akli-Nartey, E E K; Kukah, A S and Agyekum, A K (2023) Importance-performance analysis (IPA) of the indoor environmental quality (IEQ) of an edge-certified building in Ghana. International Journal of Building Pathology and Adaptation, 41(1), pp. 73-95. ISSN 23984708

Agyekum, K; Botchway, S Y; Adinyira, E and Opoku, A (2022) Environmental performance indicators for assessing sustainability of projects in the Ghanaian construction industry. Smart and Sustainable Built Environment, 11(4), pp. 918-950. ISSN 2046-6099

Agyekum, K; Hammond, S F and Salgin, B (2021) Occupants' perceived importance and satisfaction with the indoor environmental quality of a green building. Built Environment Project and Asset Management, 11(4), pp. 627-642. ISSN 2044-124X

Agyekum-Mensah, G; Knight, A and Pasquire, C (2012) Adaption of structured analysis design techniques methodology for construction project planning. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.

Ahadzie, D K; Proverbs, D G and Olomolaiye, P (2006) Development of research instrument for project managers' performance measures in mass house building projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ahadzie, D K; Proverbs, D G and Olomolaiye, P O (2008) Model for predicting the performance of project managers at the construction phase of mass house building projects. Journal of Construction Engineering and Management, 134(8), pp. 618-629. ISSN 0733-9364

Ahadzie, D K; Proverbs, D G; Olomolaiye, P O and Ankrah, N (2009) Towards developing competency-based measures for project managers in mass house building projects in developing countries. Construction Management and Economics, 27(1), pp. 89-102. ISSN 1466433X

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Ahiaga-Dagbui, D D; Tokede, O; Morrison, J and Chirnside, A (2020) Building high-performing and integrated project teams. Engineering, Construction and Architectural Management, 27(10), pp. 3341-3361. ISSN 0969-9988

Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.

Ahmad, I U and Sein, M K (1997) Construction project teams for TQM: A factor-element impact model. Construction Management and Economics, 15(5), pp. 457-467. ISSN 01446193

Ahmad, M A; Demian, P and Price, A D F (2012) Building information modelling implementation plans: A comparative analysis. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ahmad, T and Aibinu, A A (2017) Project delivery attributes influencing green building project outcomes: A review and future research directions. Built Environment Project and Asset Management, 7(5), pp. 471-489. ISSN 2044-124X

Ahmad, T; Aibinu, A A and Stephan, A (2017) Green building projects: Process innovation leading to project innovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Ahmad, Tayyab (2020) An inquiry of conditions and criteria associated with Green Building project success. PhD thesis, University of Melbourne, Australia.

Ahmed, M O; Abdul Nabi, M; El-Adaway, I H; Caranci, D; Eberle, J; Hawkins, Z and Sparrow, R (2021) Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11): 05021008, ISSN 0733-9364

Ahmed, Mohammed Ali (2020) An exploration of factors influencing quality management system implementation: The case of the Australian construction industry. PhD thesis, Queensland University of Technology, Australia.

Ahmed, S (2022) Risk management framework an analysis of risk management process in SMEs of the UK construction industry. PhD thesis, University of the West of Scotland, UK.

Ahmed, S and Arocho, I (2022) Implementing a choosing-by-advantages decision-making method to evaluate the critical success factors of mass-timber building materials in the US. Journal of Construction Engineering and Management, 148(10): 05022010, ISSN 0733-9364

Ahmed, S and El-Sayegh, S (2022) The challenges of sustainable construction projects delivery–evidence from the UAE. Architectural Engineering and Design Management, 18(3), pp. 299-312. ISSN 1745-2007

Ahmed, S and El-Sayegh, S (2024) Relevant criteria for selecting project delivery methods in sustainable construction. International Journal of Construction Management, 24(5), pp. 512-520. ISSN 1562-3599

Ahmed, S; Mahmud, A; Akoh, S and Tariq, U (2024) Exploring IPD as an antidote to fragmentation within the UK construction sector. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Ahmed, S H A and Suliman, S M A (2020) A structure equation model of indicators driving BIM adoption in the Bahraini construction industry. Construction Innovation, 20(1), pp. 61-78. ISSN 1471-4175

Ahmed, S M (1993) An integrated total quality management (TQM) model for the construction process. PhD thesis, Georgia Institute of Technology, USA.

Ahmed, S M; Sang, L P and Torbica, Ž M (2003) Use of quality function deployment in civil engineering capital project planning. Journal of Construction Engineering and Management, 129(4), pp. 358-368. ISSN 0733-9364

Ahmed, S N; Pasquire, C and Manu, E (2022) Key factors affecting commercial actors in collaborative working within the UK construction industry. Journal of Financial Management of Property and Construction, 27(3), pp. 323-347. ISSN 1366-4387

Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry. PhD thesis, Nottingham Trent University, UK.

Ahn, Y H; Holley, P and Kang, J S (2009) Risk management of exchange rates in international construction. International Journal of Construction Education and Research, 5(1), pp. 24-44. ISSN 1557-8771

Ahn, Y H; Pearce, A R and Holley, P W (2009) Project delivery system for foreign manufacturers in the United States. International Journal of Construction Education and Research, 5(3), pp. 149-166. ISSN 1557-8771

Ahuja, R; Sawhney, A and Arif, M (2018) Developing organizational capabilities to deliver lean and green project outcomes using BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1255-1276. ISSN 0969-9988

Ahuja, V; Yang, J and Shankar, R (2009) Benefits of collaborative ICT adoption for building project management. Construction Innovation, 9(3), pp. 323-340. ISSN 1471-4175

Ahuja, V; Yang, J and Shankar, R (2010) Perceptions affecting ICT adoption for building project management in the Indian construction industry. International Journal of Construction Management, 10(2), pp. 1-18. ISSN 1562-3599

Ahuja, V; Yang, J and Shankar, R (2010) IT-enhanced communication protocols for building project management. Engineering, Construction and Architectural Management, 17(2), pp. 159-179. ISSN 0969-9988

Ahuja, V; Yang, J; Skitmore, M and Shankar, R (2010) An empirical test of causal relationships of factors affecting ICT adoption for building project management: An Indian SME case study. Construction Innovation, 10(2), pp. 164-180. ISSN 1471-4175

Ahuja, Vanita (2007) It enhanced communication protocols for building project management by small and medium enterprises in the Indian construction industry. PhD thesis, Queensland University of Technology, Australia.

Aichouni, M; Messaoudene, N A; Al-Ghonamy, A and Touahmia, M (2014) An empirical study of quality management systems in the Saudi construction industry. International Journal of Construction Management, 14(3), pp. 181-190. ISSN 1562-3599

Aidane, A (2021) Applying an equity lens to project stakeholder engagement: How organizations are embedding equitable stakeholder engagement in their project management processes. PhD thesis, Canterbury Christ Church University, UK.

Aigbavboa, C and Thwala, W (2013) The role of beneficiaries' participation in South Africa low-income housing occupants' satisfaction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Aigbavboa, C and Thwala, W (2014) An assessment of critical success factors for the reduction of the cost of poor quality from construction projects in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Aigbavboa, C O; Aghimien, D O; Thwala, W D and Ngozwana, M N (2022) Unprepared industry meet pandemic: COVID-19 and the South Africa construction industry. Journal of Engineering, Design and Technology, 20(1), pp. 183-200. ISSN 1726-0531

Aiyetan, O A (2019) Influence of the management styles and quality of management on project delivery. Journal of Construction Business and Management, 3(1), pp. 38-44. ISSN 2521-0165

Ajayi, O O (2016) Maintenance management of prison facilities in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.

Ajayi, O O; Koleoso, H; Ajayi, M and Faremi, O (2019) Maintenance performance of prison facilities in Southwestern Nigeria. Journal of Construction Business and Management, 3(2), pp. 26-34. ISSN 2521-0165

Ajayi, S; Brinklow-Harris, J; Alaka, H A and Dauda, J A (2019) Managing the benefits and impediments to offsite construction in the UK construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects. PhD thesis, University of the West of England, Bristol, UK.

Ajayi, S O; Oyebiyi, F and Alaka, H A (2023) Facilitating compliance with BIM ISO 19650 naming convention through automation. Journal of Engineering, Design and Technology, 21(1), pp. 108-129. ISSN 1726-0531

Aje, I (2012) The impact of contractors' prequalification on construction project delivery in Nigeria. Engineering, Construction and Architectural Management, 19(2), pp. 159-172. ISSN 0969-9988

Akade, S A (2017) Understanding the impact of culture on project execution in a developing country: an action research study of six international oil and gas companies in Nigeria. PhD thesis, University of Liverpool, UK.

Akanmu, A; Anumba, C and Messner, J (2014) Critical review of approaches to integrating virtual models and the physical construction. International Journal of Construction Management, 14(4), pp. 267-282. ISSN 1562-3599

Akanmu, A and Anumba, C J (2015) Cyber-physical systems integration of building information models and the physical construction. Engineering, Construction and Architectural Management, 22(5), pp. 516-535. ISSN 0969-9988

Akanmu, A A (2012) Towards cyber-physical systems integration in construction. PhD thesis, Pennsylvania State University, USA.

Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.

Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599

Akinade, O O (2017) BIM-based software for construction waste analytics using artificial intelligence hybrid models. PhD thesis, University of the West of England, Bristol, UK.

Akinci, B H (2000) Automatic generation of work spaces and analysis of time-space conflicts at construction sites. PhD thesis, Stanford University, USA.

Akinnola, P (2021) Improving project performance on construction projects through stakeholder management-an action research inquiry. PhD thesis, University of Liverpool, UK.

Akinradewo, O; Aghimien, D; Aigbavboa, C and Onyia, M (2022) Factors influencing the adoption of insurance as a risk treatment tool by contractors in the construction industry. International Journal of Construction Management, 22(13), pp. 2484-2492. ISSN 1562-3599

Akinrinade, M B (2018) Managing risk in construction projects: A quantitative study. PhD thesis, Northcentral University, USA.

Akintola, A; Venkatachalam, S and Root, D (2017) New BIM roles' legitimacy and changing power dynamics on BIM-enabled projects. Journal of Construction Engineering and Management, 143(9): 04017066, ISSN 0733-9364

Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(2), pp. 105-113. ISSN 01446193

Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193

Akintoye, A; Hardcastle, C; Beck, M; Chinyio, E and Asenova, D (2003) Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5), pp. 461-470. ISSN 01446193

Akinyemi, A; Sun, M and Gray, A J G (2018) An ontology-based data integration framework for construction information management. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(3), pp. 111-125. ISSN 17514304

Akomea-Frimpong, Isaac (2023) Developing a holistic financial risk management framework to optimize financial performance of public-private partnership projects in Ghana. PhD thesis, Western Sydney University, Australia.

Akuete, E; Nduka, D O and Ogundipe, K E (2022) Maintenance feedback mechanisms and limiting factors of post-occupancy evaluation in student residents of higher education institutions in Nigeria. Journal of Construction in Developing Countries, 27(2), pp. 17-41. ISSN 1823-6499

Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.

Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.

Al Khatib, B A (2021) Determining the delay factors for reconstructed mega-project’s phases and the associated challenges. PhD thesis, University of Malaya, Malaysia.

Al Nahyan, Moza Tahnoon (2012) Management of mega infrastructure projects in the United Arab Emirates. PhD thesis, Monash University, Australia.

Al Rashdi, A (2012) A strategic framework for the further enhancement of the standard forms of construction contract in the Sultanate of Oman. PhD thesis, University of Salford, UK.

Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry. PhD thesis, Heriot-Watt University, UK.

Al Shamsi, H A A (2015) A framework for group leadership in the construction industry in Abu Dhabi. PhD thesis, University of Wolverhampton, UK.

Al Subaih, A (2016) A framework for implementation of IPD principles in oil & gas projects. PhD thesis, University of Salford, UK.

Al-Abbadi, G M and Agyekum-Mensah, G (2022) The effects of motivational factors on construction professionals productivity in Jordan. International Journal of Construction Management, 22(5), pp. 820-831. ISSN 1562-3599

Al-Adwani, M (2021) Development of a BIM and lean construction process protocol for the construction industry in Kuwait: From a client perspective. PhD thesis, University of Salford, UK.

Al-Adwani, M M H M A (2021) Development of a BIM and LEAN construction process protocol for the construction industry in Kuwait, from a client perspective. PhD thesis, University of Salford, UK.

Al-Ajam, M (2008) Integrating collaborative extranets with project integrated databases to improve the construction tender stage. PhD thesis, University of Salford, UK.

Al-Bataineh, M T (2008) Scenario-based planning for tunnelling construction. PhD thesis, University of Alberta, Canada.

Al-Dahash, H; Thayaparan, M and Kulatunga, U (2016) Understanding the terminologies: Disaster, crisis and emergency. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.

Al-Fadhali, N (2024) An amos-SEM approach to evaluating stakeholders' influence on construction project delivery performance. Engineering, Construction and Architectural Management, 31(2), pp. 638-661. ISSN 0969-9988

Al-Gahtani, K; Alsugair, A; Alsanabani, N; Alabduljabbar, A and Almutairi, B (2024) Forecasting delay-time model for Saudi construction projects using DEMATEL–sd technique. International Journal of Construction Management, 24(11), pp. 1225-1239. ISSN 1562-3599

Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman. PhD thesis, Loughborough University, UK.

Al-Hashimy, H N H; Yao, J; Pitchay, A A and Hussein, W N (2026) Leveraging computerized accounting information systems for sustainable construction: The role of digital practices, eco-innovation, and organizational sustainability culture in enhancing project performance. Journal of Construction Engineering and Management, 152(5): 04026042, ISSN 0733-9364

Al-Khatri, H; Etri, T and Gadi, M B (2022) User response to indoor thermal environment in female high school buildings in Oman. Building Research & Information, 50(1-2), pp. 192-212. ISSN 0961-3218

Al-Mansouri, O (1988) The relationship between the designer and contractor in Saudi Arabia. PhD thesis, University of Reading, UK.

Al-Musallam, A A (2002) A web-based approach for coordinating architectural drawings with other construction documents. PhD thesis, Illinois Institute of Technology, USA.

Al-Qayoudhi, S. A. S.; Kamal, E. M. and Said, I. (2026) Improving total quality management implementation at the University of Technology and Applied Sciences in the Sultanate of Oman. Journal of Construction in Developing Countries, 30(Supp.), pp. 15-37. ISSN 1823-6499

Al-Shabbani, Z; Taherpour, F and Dadi, G B (2026) Development and short-term evaluation of a pretask safety briefing tool for highway construction and maintenance crews. Journal of Construction Engineering and Management, 152(5): 04026048, ISSN 0733-9364

Al-Sharif, F and Kaka, A (2005) Private finance intiative project's financial modelling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.

Al-Sinan, F M (1986) Evaluation of construction management contracts in developing countries. PhD thesis, Purdue University, USA.

Al-Tarazi, D.; Alkhamaiseh, M.; Sara, R.; Rice, L. and Booth, C. A. (2026) Insights of residents' satisfaction and well-being associated with the architectural design of domestic buildings. Journal of Engineering, Design and Technology, 24(1), pp. 151-170. ISSN 1726-0531

Al-Turfi, S (2017) Best practice project management for the sustainable regeneration of Holy Karbala Province in Iraq. PhD thesis, University of Bolton, UK.

Al-Wareh, M (1979) Investigation of the design procedures for buildings of quality in modern architecture, with notes on the relevant contemporary situation in Syria. PhD thesis, University of Sheffield, UK.

Al-Yami, A M and Price, A D F (2006) A framework for implementing sustainable construction in building briefing project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

AlAbbadi, G (2020) Development of a framework towards enhancing workers productivity in the Jordanian construction industry. PhD thesis, Coventry University, UK.

AlHarmoodi, S M and Dulaimi, M (2022) The alignment of the open innovation process and the project lifecycle. Built Environment Project and Asset Management, 12(4), pp. 556-572. ISSN 2044-124X

AlKheder, S; Al Otaibi, H; Al Baghli, Z; Al Ajmi, S and Alkhedher, M (2025) Analytic hierarchy process (AHP) assessment of Kuwait mega construction projects' complexity. Engineering, Construction and Architectural Management, 32(3), pp. 1903-1946. ISSN 0969-9988

AlMaian, R Y; Needy, K L; Walsh, K D and Alves, T D C L (2016) A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects. Journal of Construction Engineering and Management, 142(2): 04015061, ISSN 0733-9364

AlMunifi, A A and Almutairi, S (2021) Lessons learned framework for efficient delivery of construction projects in Saudi Arabia. Construction Economics and Building, 21(4), pp. 115-141. ISSN 2204-9029

AlSehaimi, A (2011) Improving construction planning practice in Saudi Arabia by means of lean construction principles and techniques. PhD thesis, University of Salford, UK.

Alabi, A S; Adegbile, M; Alabi, O; Abisuga, O; Oyewole, K and Oshodi, O (2017) Stakeholders' role in disaster-risk-reduction of fire occurrences in Lagos metropolis. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 425-440. ISSN 1759-5916

Alade, W A (2020) Environmental and socio-economic impacts of Ojodu-Berger Road upgrade, Lagos, Nigeria. Journal of Construction Business and Management, 4(1), pp. 24-33. ISSN 2521-0165

Alameri, H (2018) A resource-based perspective of project success in public sector projects in Abu Dhabi. PhD thesis, Bournemouth University, UK.

Alaqad, M; Gidado, K; Piroozfar, P; Alkhadim, M and Dorgham, A (2020) Efficacy of value management system in building projects: A UK perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Alarcon-Cardenas, L F (1992) Project performance modeling: A methodology for evaluating project execution strategies. PhD thesis, University of California, Berkeley, USA.

Alarćon, L F and Ashley, D B (1996) Modeling project performance for decision making. Journal of Construction Engineering and Management, 122(3), pp. 265-273. ISSN 0733-9364

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.

Alazemi, T (2011) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.

Alazemi, Talal Lafi (2012) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.

Albattah, M A (2016) A critical analysis of the structural changes related to craft demographics influencing craft supply and demand in the United States across multiple dimensions. PhD thesis, University of Colorado at Boulder, USA.

Albayoudh, K A F (2003) Assessment of total quality management in the Saudi construction industry organisations. PhD thesis, Loughborough University, UK.

Albert, I (2020) A lean production approach to materials management in the Nigerian construction industry. PhD thesis, Nelson Mandela University, South Africa.

Aldhaheri, M; Bakchan, A and Sandhu, M A (2018) A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects: End-user's perspective. Engineering, Construction and Architectural Management, 25(9), pp. 1226-1252. ISSN 0969-9988

Aldhanhani, M A A (2018) Enablers and barriers to knowledge sharing in the UAE infrastructural projects. PhD thesis, British University in Dubai, UAE.

Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2021) Best practices of organizational change for adopting alternative project delivery methods in the AEC industry. Engineering, Construction and Architectural Management, 28(4), pp. 1060-1082. ISSN 0969-9988

Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2023) Employee reactions to adoption of alternative project delivery methods within the AEC industry. International Journal of Construction Education and Research, 19(1), pp. 4-21. ISSN 1557-8771

Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2023) Alternative project delivery method adoption in the AEC industry: An organizational change perspective. International Journal of Construction Education and Research, 19(2), pp. 150-165. ISSN 1557-8771

Aldossari, K M A (2020) Organizational change management for the adoption of alternative project delivery methods within the AEC industry. PhD thesis, Arizona State University, USA.

Aleithawe, I (2010) Acquisition of right of way for highway construction. PhD thesis, Mississippi State University, USA.

Aleithawe, I; Sinno, R R and McAnally, W H (2012) Right-of-way acquisition duration prediction model for highway construction projects. Journal of Construction Engineering and Management, 138(4), pp. 540-544. ISSN 0733-9364

Alencastro, J; Fuertes, A and de Wilde, P (2016) Improving the quality management systems for energy-efficient social housing projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Alghamdi, A M (2022) A systemic approach for construction contract claims settlement in the Kingdom of Saudi Arabia. PhD thesis, University of Reading, UK.

Algithami, S M (2017) The use of a system dynamics approach for modelling maturity of total quality management in Saudi construction firms. PhD thesis, University of Reading, UK.

Algraiw, I H A (2015) The engagement of expert opinions in the modeling of multi-attribute decision making for the selection of project delivery methods in building construction. PhD thesis, Missouri University of Science and Technology, USA.

Alhajeri, M A (2004) Post-construction liabilities for latent defects in building and construction contracts: the theoretical foundations and the allocation of risk, a comparative study in Kuwaiti, French, and English Law. PhD thesis, University of Essex, UK.

Alhamami, A (2021) Standardized qualification framework for achieving energy efficiency training for BIM. PhD thesis, Cardiff University, UK.

Alharbi, F (2020) Critical delay factors in housing construction projects in Saudi Arabia: Assessment and solutions. PhD thesis, Nottingham Trent University, UK.

Alharbi, Meshal Abdulaziz B (2022) Factors influencing project team effectiveness to achieve quality of building projects in the kingdom of Saudi Arabia. PhD thesis, Queensland University of Technology, Australia.

Alhosani, Y (2017) An empirical investigation of the demographics of top management team (TMT) and its influence in forecasting organizational outcome in international architecture, engineering and construction (AEC) firms: A fuzzy set approach. DEng thesis, Ecole de Technologie Superieure, Canada.

Alhusban, A A and Almshaqbeh, S N (2024) Delivering an inclusive built environment for physically disabled people in public universities (Jordan as a case study). Journal of Engineering, Design and Technology, 22(6), pp. 1980-1998. ISSN 1726-0531

Ali, J A; Al-Kharusi, S; Khwaja, M G; Razzak, M R and Bashir, S (2025) Requirement engineering and project performance: Mediating effect of communication effectiveness, change readiness, stakeholder engagement and moderating effect of team cohesion. Engineering, Construction and Architectural Management, 32(8), pp. 5484-5507. ISSN 0969-9988

Ali, A; Wang, H; Soomro, M A and Islam, T (2020) Shared leadership and team creativity: Construction industry perspective. Journal of Construction Engineering and Management, 146(10): 04020122, ISSN 0733-9364

Ali, A H; Kineber, A F; Elyamany, A; Hussein Ibrahim, A and Daoud, A O (2025) Exploring stationary and major modular construction challenges in developing countries: A case study of Egypt. Journal of Engineering, Design and Technology, 23(2), pp. 569-598. ISSN 1726-0531

Ali, M M A (2011) A framework for enhancing the success of construction projects undertaken in Libya. PhD thesis, Sheffield Hallam University, UK.

Alim, S and Polak, J (2016) Public-private partnerships for future urban infrastructure. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 150-158. ISSN 17514304

Aliu, J; Oke, A E and Ehiosun, L U (2025) Distributed ledger technology integration in Nigerian construction industry: Key drivers. International Journal of Building Pathology and Adaptation, 43(7), pp. 1706-1724. ISSN 2398-4708

Aliu, J and Aigbavboa, C O (2020) Employers’ perception of employability skills among built-environment graduates. Journal of Engineering, Design and Technology, 18(4), pp. 847-864. ISSN 1726-0531

Aliu, J; Agbaje, D H; Oke, A E and Ebekozien, A (2025) Driving forces behind the adoption of IEQ principles in building design: Evidence from Nigerian quantity surveying firms. International Journal of Building Pathology and Adaptation, 43(6), pp. 1541-1558. ISSN 2398-4708

Aliyu, A A (2014) Product stewardship as a novel sustainability pathway for the UK precast concrete industry. PhD thesis, Loughborough University, UK.

Aljarman, M (2016) Emerging risk from the application of building information modelling through the life cycle of projects. PhD thesis, University of Liverpool, UK.

Aljassmi, H; Han, S and Davis, S (2016) Analysis of the complex mechanisms of defect generation in construction projects. Journal of Construction Engineering and Management, 142(2): 04015063, ISSN 0733-9364

Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.

Alkhathami, M M (2004) Examination of the correlation of critical success and delay factors in construction projects in the kingdom of Saudi Arabia. PhD thesis, University of Pittsburgh, USA.

Alkilani, S and Loosemore, M (2022) Project performance measurement for small-and-medium sized construction contractors in the Jordanian construction industry. Construction Management and Economics, 40(10), pp. 743-769. ISSN 01446193

Alleem, R (2012) A usability based model for suggestion system evaluation of infrastructure organisations in the UAE. PhD thesis, University of Salford, UK.

Allport, R J (2015) Pre-implementation planning: The weak link in rail projects 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 205-212. ISSN 17514304

Allport, R J and Ward, S (2010) Operational risk: The focus for major infrastructure? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 121-127. ISSN 17514312

Almalki, T S (2015) A study of the influence of trust on the relationships between team members in engineering projects. PhD thesis, University of Dundee, UK.

Almarri, K and Boussabaine, H (2017) Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Built Environment Project and Asset Management, 7(5), pp. 546-556. ISSN 2044-124X

Almazroa, D A (2003) Project delivery system decision framework using the weighting factors and analytic hierarchy process methods. PhD thesis, University of Pittsburgh, USA.

Almeida, Laura (2019) Energy-related occupant behaviour in green and non-rated buildings. PhD thesis, Western Sydney University, Australia.

Almutairi, S (2017) Assessment and develop the Saudi's contractors classification system. PhD thesis, Arizona State University, USA.

Alnaggar, Ahmed Mohamed Mohamed Moustafa (2022) Digital transformation in asset management organisations: towards a data driven approach for life cycle asset management. PhD thesis, University College London, UK.

Alnusairat, S and Abu Qadourah, J (2025) Moving to green technologies: Acceptance and perception of architectural solar photovoltaic technology for residential buildings. Architectural Engineering and Design Management, 21(2), pp. 338-355. ISSN 1745-2007

Alothman, A and Vilventhan, A (2025) Development of building information model-enabled facility management for metro rail stations. Journal of Construction Engineering and Management, 151(3): 05024018, ISSN 0733-9364

Alqahtani, A (2019) An appraisal of the role of project management offices in promoting knowledge management within KSA construction companies. PhD thesis, University of Salford, UK.

Alqahtani, A (2019) An appraisal of the role of project management offices (PMO) in promoting knowledge management (km) within KSA construction companies. PhD thesis, University of Salford, UK.

Alqahtani, B M A (2022) Influence of work-related stressors on safety performance on construction sites in the Kingdom of Saudi Arabia. PhD thesis, Western Michigan University, USA.

Alqahtani, F (2017) The relationship between the values of Abu-Dhabi Police and the competencies of their project managers. PhD thesis, University of Wolverhampton, UK.

Alqahtani, F K; Alkhaldi, M; Alsaqer, T; Abotaleb, I S; Mohamed, A G and Dirar, S (2022) A comparative assessment of advanced construction systems incorporating green concrete. Journal of Construction Engineering and Management, 148(9): 04022083, ISSN 0733-9364

Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry. PhD thesis, Brunel University, UK.

Alrashidi, M (2021) Multiple perspective of public-private partnership project success: the case of Kuwaiti public housing initiative. PhD thesis, University of Salford, UK.

Alreshidi, E (2015) Towards facilitating team collaboration during construction project via the development of cloud-based BIM governance solution. PhD thesis, Cardiff University, UK.

Alsafouri, S (2017) Information technology and human factors to enhance design and constructability review processes in construction. PhD thesis, Arizona State University, USA.

Alsamadani, R; Hallowell, M and Javernick-Will, A N (2013) Measuring and modelling safety communication in small work crews in the US using social network analysis. Construction Management and Economics, 31(6), pp. 568-579. ISSN 1466433X

Alsamarraie, M M; Yousif, O S and Ghazali, F E M (2025) Procurement integrity: Best practices for PPP projects in Iraq and Malaysia. Construction Economics and Building, 25(3-4), pp. 289-310. ISSN 2204-9029

Alsamarraie, M M and Ghazali, F (2023) Evaluation of organizational procurement performance for public construction projects: Systematic review. International Journal of Construction Management, 23(14), pp. 2499-2508. ISSN 1562-3599

Alshamsi, O S (2019) Multiple criteria decision making for supplier selection and cross-cultural considerations: Case study of the United Kingdom / United Arab Emirates construction industry. PhD thesis, University of Exeter, UK.

Alsharef, A F A (2022) Leveraging data analytics to improve construction operations and occupational safety. PhD thesis, North Carolina State University, USA.

Alsharqawi, M; Abu Dabous, S; Zayed, T and Hamdan, S (2021) Budget optimization of concrete bridge decks under performance-based contract settings. Journal of Construction Engineering and Management, 147(6): 04021040, ISSN 0733-9364

Alshawi, M and Faraj, I (2002) Integrated construction environments: Technology and implementation. Construction Innovation, 2(1), pp. 33-51. ISSN 1471-4175

Alshboul, O; Shehadeh, A and Saleh, E (2025) Advancing construction quality management: An integrated evidential reasoning and belief functions framework. Journal of Construction Engineering and Management, 151(8): 04025093, ISSN 0733-9364

Alshehri, A R (2016) Quality management system for building maintenance. PhD thesis, Heriot-Watt University, UK.

Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.

Alshihre, F (2018) Development of a framework for client satisfaction in the Saudi construction industry. PhD thesis, University of Wolverhampton, UK.

Alshihre, F; Chinyio, E; Nzekwe-Excel, C and Daniel, E I (2020) Improving clients' satisfaction in construction projects: The case of Saudi Arabia. Built Environment Project and Asset Management, 10(5), pp. 709-723. ISSN 2044-124X

Alshihre, F; Chinyio, E; Nzekwe-Excel, C and Daniel, E I (2023) Pursuing alignment of clients' and contractors' perceptions of client satisfaction in Saudi Arabian projects. Built Environment Project and Asset Management, 13(3), pp. 341-358. ISSN 2044-124X

Alsubaey, M H (2017) A hybrid machine learning and text-mining approach for the automated generation of early warnings in construction project management. PhD thesis, Cranfield University, UK.

Alsulamy, S (2015) Developing a performance measurement framework for municipal construction projects in Saudi Arabia. PhD thesis, Edinburgh Napier University, UK.

Alsulamy, S; Wamuziri, S and Taylor, M (2012) Evaluation of key metrics for measurement of project performance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Althaqafi, Torky (2015) Using stakeholder theory to explain the development and operation of safety culture and systems to improve safety performance in the construction industry in Saudi Arabia. PhD thesis, University of Adelaide, Australia.

Altomonte, S; Schiavon, S; Kent, M G and Brager, G (2019) Indoor environmental quality and occupant satisfaction in green-certified buildings. Building Research & Information, 47(3), pp. 255-274. ISSN 0961-3218

Altoryman, A (2014) Identification and assessment of risk factors affecting construction projects in the gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.

Altoryman, A S (2014) Identification and assessment of risk factors affecting construction projects in the Gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.

Aluko, O R; Godwin Iroroakpo, I and Mewomo, M C (2021) Relationship between perceived service quality and client satisfaction indicators of engineering consultancy services in building projects. Journal of Engineering, Design and Technology, 19(2), pp. 557-577. ISSN 1726-0531

Alutaibi, A (2018) The impact of facility management practices on tenant satisfaction forresidential complexes in the Kingdom of Saudi Arabiaresidential complexes in the Kingdom of Saudi Arabia. PhD thesis, Loughborough University, UK.

Alzaed, A (2012) User centered passive building design. PhD thesis, University of Liverpool, UK.

Alzahrani, A (2015) Uncovering the emerging risks from climate change scenarios and related climate change risk management in the building sector in the UK. PhD thesis, University of Liverpool, UK.

Alzanati, A (2021) Complex building construction projects: reducing rework through facilitation of craftspeople's motivation in United Arab Emirates. PhD thesis, Bournemouth University, UK.

Alzayd, Rana (2016) A constructability methodology to integrate planning and design for workers' safety in construction management. DrIng thesis, University of Braunschweig & University of Florence, Germany.

Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599

Alzubi, K M; Alkhateeb, A M and Hiyassat, M A (2023) Factors affecting the job satisfaction of construction engineers: Evidence from Jordan. International Journal of Construction Management, 23(2), pp. 319-328. ISSN 1562-3599

Amarkhil, Q and Elwakil, E (2021) Constraints and opportunities facing construction organization in post-conflict condition in Afghanistan. Journal of Financial Management of Property and Construction, 26(3), pp. 301-318. ISSN 1366-4387

Amarkhil, Q and Elwakil, E (2022) Construction organization success strategy in post-conflict environment. International Journal of Construction Management, 22(4), pp. 701-710. ISSN 1562-3599

Ambrose, M D and Tucker, S N (2000) Procurement system evaluation for the construction industry. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Ameyaw, E E; Edwards, D J; Kumar, B; Thurairajah, N; Owusu-Manu, D G and Oppong, G D (2023) Critical factors influencing adoption of blockchain-enabled smart contracts in construction projects. Journal of Construction Engineering and Management, 149(3): 04023003, ISSN 0733-9364

Amies, P; Jin, X and Senaratne, S (2025) Identification of success criteria over life cycle of dam industry projects: A Delphi study. Construction Innovation, 25(3), pp. 689-709. ISSN 1471-4175

Amin, S H (2024) Predictive relationship in time and cost between planning and construction phases in capital projects. DBA thesis, Grand Canyon University, USA.

Ammar, Ashtarout (2023) Digital twins for ancillary transportation asset data management. PhD thesis, University of Kentucky, USA.

Ammar, T; Abdel-Monem, M and El-Dash, K (2025) Regression-based model predicting cost contingencies for road network projects. International Journal of Construction Management, 25(11), pp. 1273-1287. ISSN 1562-3599

Amoah, A; Berbegal-Mirabent, J and Marimon, F (2023) National cultural dimensions and their impact on construction project management in developing countries: The case of Ghana. Journal of Construction in Developing Countries, 28(2), pp. 163-187. ISSN 1823-6499

Amoah, C; Kajimo-Shakantu, K and Van Shalkwyk, T (2022) The level of participation of the end-users in the construction of the rdp houses: The case study of manguang municipality. International Journal of Construction Management, 22(5), pp. 949-960. ISSN 1562-3599

Amoah, C and Pretorius, L (2020) Evaluation of the impact of risk management on project performance in small construction firms in South Africa: The case study of construction systems. Journal of Engineering, Design and Technology, 18(3), pp. 611-634. ISSN 1726-0531

Amos, D; Au-Yong, C P and Musa, Z N (2020) Developing key performance indicators for hospital facilities management services: A developing country perspective. Engineering, Construction and Architectural Management, 27(9), pp. 2715-2735. ISSN 0969-9988

Amponsah, C T (2010) Public-private partnerships: Critical success factors for procurements of capital projects. PhD thesis, Capella University, USA.

Amponsah, C T and Forbes, J L (2012) Public-private partnerships: Critical factors for procurement of capital projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 211-221. ISSN 17514312

An, X; Zheng, F; Wang, Z; Li, Z; Jiao, Y and An, H (2025) Dynamic risk assessment approach for deep foundation pit construction based on the integration of multisource data using D-S evidence theory. Journal of Construction Engineering and Management, 151(10): 04025155, ISSN 0733-9364

Anagnostou, E (2005) Investigation of risk management and uncertainty in Athens 2004 Olympic games: The Equestrian Centre case study. PhD thesis, University College London, UK.

Anagnostou, G (2008) Quality in the apartment building industry a case study in Greece. PhD thesis, University College London, UK.

Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.

Anastassakou, M (2008) Organisational benefits using explicit project management tools, techniques and knowledge. PhD thesis, University College London, UK.

Anbar, D R; Chang, T; Ullah, S; Alqershy, M T; Mousa, K and Deng, X (2026) The role of interpersonal distrust as a mediator of the relationship between ethnic minorities and knowledge hiding in international construction projects. Engineering, Construction and Architectural Management, 33(1), pp. 832-855. ISSN 0969-9988

Anbar, D. R.; Deng, X.; Taha Alqershy, M. and Ullah, S. (2026) Unveiling interpersonal distrust as a mediator between contingent employees and knowledge hiding in international construction projects in the gulf region. International Journal of Construction Management, 26(7), pp. 1390-1405. ISSN 1562-3599

Anbar, D R; Chang, T; Deng, X and Mahmoud, M R I (2024) Implementing effective knowledge management in international construction projects by eliminating knowledge hiding. Journal of Construction Engineering and Management, 150(8): 04024082, ISSN 0733-9364

Ancell, D J (2007) Performance-based contracting in construction: innovation for the brave? PhD thesis, University of Reading, UK.

Andary, E G; Abi Shdid, C; Chowdhury, A and Ahmad, I (2020) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(3), pp. 609-633. ISSN 0969-9988

Andersen, Janthea (2010) An empirical study of design management practices in collaborative design and construction projects: The roles, activities and conceptions of design management across project stages and within the building, civil and process sectors of a construction company. PhD thesis, University of Queensland, Australia.

Anderson, S D; Fisher, D J and Rahman, S P (2000) Integrating constructability into project development: A process approach. Journal of Construction Engineering and Management, 126(2), pp. 81-88. ISSN 0733-9364

Anderson, S d (1989) Potential for construction industry improvement. PhD thesis, University of Texas at Austin, USA.

Andrade, J B (2017) Early stage design methodology to ensure life cycle sustainability of residential buildings. PhD thesis, Universidade do Minho, Portugal.

Andrews, F; Sal Moslehian, A; Johnston, N and Tucker, R (2024) Impacts of building defects on the health and wellbeing of apartment residents: A scoping review. Building Research & Information, 52(4), pp. 446-462. ISSN 0961-3218

André, J P C G (2014) Determination of the main parameters affecting the performance of bridge falsework systems. PhD thesis, Oxford Brookes University, UK.

Angelides, D and Xenidis, Y (2005) A methodology for the development of a european approach concerning performance and risks of built systems. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Anjomshoa, E (2024) Key performance indicators of construction companies in branding products and construction projects for success in a competitive environment in Iran. Engineering, Construction and Architectural Management, 31(5), pp. 2151-2175. ISSN 0969-9988

Ankrah, N A (2007) An investigation into the impact of culture on construction project performance. PhD thesis, University of Wolverhampton, UK.

Ankrah, N A; Proverbs, D and Debrah, Y (2009) Factors influencing the culture of a construction project organisation: An empirical investigation. Engineering, Construction and Architectural Management, 16(1), pp. 26-47. ISSN 0969-9988

Annor, John (2025) Building pathways to the future: Leveraging collaborative instruction platforms to address global and regional challenges in construction workforce education. PhD thesis, University of Wyoming, USA.

Annunen, P and Haapasalo, H (2022) Production capability creation (PCC) for collaborative construction projects: A qualitative study from Finland. Construction Economics and Building, 22(3), pp. 1-20. ISSN 2204-9029

Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(1), pp. 62-76. ISSN 0969-9988

Ansell, M; Evans, R; Holmes, M; Price, A and Pasquire, C (2009) Collaborative working in highways major maintenance projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 59-67. ISSN 17514312

Anthony Jnr, B (2025) Sustainable mobility governance in smart cities for urban policy development: A scoping review and conceptual model. Smart and Sustainable Built Environment, 14(3), pp. 649-671. ISSN 2046-6099

Antillon, E I (2016) An exploration of the influence of public-private-partnerships on the life cycle design decision-making process of highway projects. PhD thesis, University of Colorado at Boulder, USA.

Antillon, E I; Molenaar, K R and Javernick-Will, A (2017) Evaluating the effect of contract timing on lifecycle-design innovation in public-private partnerships: Comparative case study of highway projects. Journal of Construction Engineering and Management, 143(4): 05016023, ISSN 0733-9364

Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Antoniadis, D (2009) Managing complexity in project teams. PhD thesis, Loughborough University, UK.

Antoniadis, D N; Edum-Fotwe, F T and Thorpe, A (2006) Project reporting and complexity. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Antoniadis, D N; Edum-Fotwe, F T; Thorpe, A and McCaffer, R (2009) Complexity effect of project team member selection practices in construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Antunes, R; González, V A; Walsh, K; Rojas, O; O'Sullivan, M and Odeh, I (2018) Benchmarking project-driven production in construction using productivity function: Capacity and cycle time. Journal of Construction Engineering and Management, 144(3): 04017118, ISSN 0733-9364

Anugwo, I C (2017) The sustainability of South African construction small, medium and micro enterprises. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

Anugwo, I C; Appau, W M; Simpeh, F and Attakora-Amaniampong, E (2024) Exploring the challenges of hydraform blocks as a sustainable building material: The experts' view. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Anugwo, Iruka Chijindu; Appau, Williams Miller; Attakora-Amaniampong, Elvis and Simpeh, Frederick (2026) Smart, but not spontaneous? Exploring the satisfaction gap and drivers in smart lighting in student housing in Ghana. Journal of Construction Business and Management, 8(S1), pp. 88-98. ISSN 2521-0165

Anumba, C J and Evbuomwan, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), pp. 271-281. ISSN 01446193

Anumba, C J; Pan, J; Issa, R R A and Mutis, I (2008) Collaborative project information management in a semantic web environment. Engineering, Construction and Architectural Management, 15(1), pp. 78-94. ISSN 0969-9988

Anund Vogel, J (2020) Incentivising Innovation in the Swedish Construction Industry. PhD thesis, KTH Royal Institute of Technology, Sweden.

Aoieong, Raymond Taiman (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM). PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Arabi, S; Eshtehardian, E and Shafiei, I (2022) Using Bayesian networks for selecting risk-response strategies in construction projects. Journal of Construction Engineering and Management, 148(8): 04022067, ISSN 0733-9364

Arabiat, A (2013) Modelling construction client risk performance using organisation behaviour parameters. PhD thesis, Loughborough University, UK.

Arafa, E A B (2015) The impact of knowledge management on project success. PhD thesis, University of Portsmouth, UK.

Arain, F M and Pheng, L S (2007) Modeling for management of variations in building projects. Engineering, Construction and Architectural Management, 14(5), pp. 420-433. ISSN 0969-9988

Arambula, E and Gharaibeh, N (2014) Methods for accumulating construction and material quality test results and their effect on acceptance decisions. Journal of Construction Engineering and Management, 140(8): 06014006, ISSN 0733-9364

Aranda-Mena, G; Sher, W; Gameson, R and Ward, P (2005) Evolving trends in nD modelling: The 'construction planning workbench'. Architectural Engineering and Design Management, 1(2), pp. 111-126. ISSN 1745-2007

Arantes, A and Ferreira, L M D F (2020) Underlying causes and mitigation measures of delays in construction projects: An empirical study. Journal of Financial Management of Property and Construction, 25(2), pp. 165-181. ISSN 1366-4387

Arar, A J; Poirier, E and Staub-French, S (2025) A research and development framework for integrated project delivery. Construction Management and Economics, 43(2), pp. 85-112. ISSN 0144-6193

Arashpour, M; Wakefield, R; Blismas, N and Abbasi, B (2016) Quantitative analysis of rate-driven and due date-driven construction: Production efficiency, supervision, and controllability in residential projects. Journal of Construction Engineering and Management, 142(1): 05015012, ISSN 0733-9364

Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2014) Analysis of disruptions caused by construction field rework on productivity in residential projects. Journal of Construction Engineering and Management, 140(2): 04013053, ISSN 0733-9364

Araujo, Adolpho Guido de (2021) Methodology for evaluation of environmental aspects in urban subdivision works in the pre-construction phase. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Arayamparambil, S. R.; Jha, K. N. and Singh, A. (2026) Development of a quality assessment scoring framework for residential buildings. International Journal of Building Pathology and Adaptation, 44(4), pp. 833-848. ISSN 2398-4708

Arayici, Y (2004) Requirements engineering in innovative systems developments for the construction industry. PhD thesis, University of Salford, UK.

Arayici, Y and Aouad, G (2005) Computer integrated construction: An approach to requirements engineering. Engineering, Construction and Architectural Management, 12(2), pp. 194-215. ISSN 0969-9988

Araújo, C S; Ferreira, E A M and Costa, D B (2025) System for tracking and managing metallic formworks adopted in cast-in-place concrete wall systems by integrating IoT and BIM. Construction Innovation, 25(4), pp. 1315-1341. ISSN 1471-4175

Arbon, P; Steenkamp, M; Cornell, V; Cusack, L and Gebbie, K (2016) Measuring disaster resilience in communities and households: Pragmatic tools developed in Australia. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 201-215. ISSN 1759-5916

Arbulu, R J; Tommelein, I D; Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(2), pp. 161-171. ISSN 0961-3218

Arditi, D and Gunaydin, H M (1998) Factors that affect process quality in the life cycle of building projects. Journal of Construction Engineering and Management, 124(3), pp. 194-203. ISSN 0733-9364

Arditi, D and Lee, D E (2003) Assessing the corporate service quality performance of design-build contractors using quality function deployment. Construction Management and Economics, 21(2), pp. 175-185. ISSN 01446193

Arditi, D and Lee, D E (2004) Service quality performance of design/build contractors using quality function deployment. Construction Management and Economics, 22(2), pp. 123-127. ISSN 01446193

Arditi, D and Mochtar, K (1996) Productivity improvement in the Indonesian construction industry. Construction Management and Economics, 14(1), pp. 13-24. ISSN 01446193

Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193

Arditi, D and Ongkasuwan, D (2009) Duties and responsibilities of construction managers: Perceptions of parties involved in construction. Journal of Construction Engineering and Management, 135(12), pp. 1370-1374. ISSN 0733-9364

Arif, F; Lodi, S H and Azhar, N (2015) Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality. International Journal of Construction Management, 15(1), pp. 59-70. ISSN 1562-3599

Arif, M; Egbu, C; Haleem, A; Kulonda, D and Khalfan, M (2009) State of green construction in India: Drivers and challenges. Journal of Engineering, Design and Technology, 7(2), pp. 223-234. ISSN 1726-0531

Arif, M; Syal, M and Hightower, R (2013) Investigating the green leadership in energy and environmental design (LEED) servicescape scale in Brazil. Construction Innovation, 13(3), pp. 242-265. ISSN 1471-4175

Arijeloye, B T (2025) Impact of project risk allocation on PPP housing project delivery in Nigeria: Partial least square structural equation modeling approach. Journal of Engineering, Design and Technology, 23(3), pp. 812-829. ISSN 1726-0531

Arja, M; Sauce, G and Souyri, B (2009) External uncertainty factors and LCC: A case study. Building Research & Information, 37(3), pp. 325-334. ISSN 0961-3218

Arnold, P and Javernick-Will, A (2013) Projectwide access: Key to effective implementation of construction project management software systems. Journal of Construction Engineering and Management, 139(5), pp. 510-518. ISSN 0733-9364

Arnold, Stuart (2008) Transforming systems engineering principles into integrated project team practice. PhD thesis, Cranfield University, UK.

Arroteia, Aline Valverde (2022) Critical success factors of BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.

Arrotéia, Aline Valverde (2022) Critical success factors for BIM in the design and construction interface. PhD thesis, Universidade de São Paulo, Brazil.

Arslan, M A O; Thiruchelvam, S and Hayder, G (2024) Measuring the availability of the requirements of the quality management system (ISO 9001:2015) clause leadership, performance, and planning: A case study. International Journal of Construction Management, 24(8), pp. 867-874. ISSN 1562-3599

Arthur, A C (2016) The impact of systems differentiation and affect heuristics in intuitive construction risk management decision making systems. PhD thesis, University College London, UK.

Arviso, B (2022) Development of the project definition rating index (PDRI) for tribal building projects. PhD thesis, Arizona State University, USA.

Asgary, A and Azimi, N (2019) Choice of emergency shelter: Valuing key attributes of emergency shelters. International Journal of Disaster Resilience in the Built Environment, 10(2-3), pp. 130-150. ISSN 1759-5916

Ashuri, B; Kashani, H; Molenaar, K R; Lee, S and Lu, J (2012) Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management, 138(4), pp. 545-557. ISSN 0733-9364

Asiedu, R. O.; Amoakwa, A. B.; Ameyaw, C.; Owusu-Manu, D. G.; Daniels, P. A. and Gyimah, S. (2026) Environmental, social, and governance considerations in sustainable construction project delivery. Construction Economics and Building, 26(2), ISSN 2204-9029

Asiedu, R and Iddris, F (2022) Value co-creation approach to management of construction project stakeholders. Journal of Construction in Developing Countries, 27(1), pp. 1-23. ISSN 1823-6499

Asiedu, R O and Ameyaw, C (2021) A system dynamics approach to conceptualise causes of cost overrun of construction projects in developing countries. International Journal of Building Pathology and Adaptation, 39(5), pp. 831-851. ISSN 23984708

Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364

Asok, A (2017) Work-life balance of migrant labourers in Kerala with special reference to civil construction sector. PhD thesis, University of Kerala, India.

Assaad, R H; Jezzini, Y and Assaf, G (2026) Proposing and exploring integrated trade delivery as a new project delivery method: Assessing the drivers and barriers to its implementation in construction projects. Journal of Construction Engineering and Management, 152(1): 04025215, ISSN 0733-9364

Assad, M; Hosny, O; Elhakeem, A and El Haggar, S (2015) Green building design in Egypt from cost and energy perspectives. Architectural Engineering and Design Management, 11(1), pp. 21-40. ISSN 1745-2007

Assaf, G and Assaad, R H (2025) A decision-support system for choosing between traditional and alternative project delivery methods for bundled projects. Engineering, Construction and Architectural Management, 32(11), pp. 7181-7216. ISSN 0969-9988

Assaf, G and Assaad, R H (2024) A data-driven decision-support tool for selecting the optimal project delivery method for bundled projects: Integrating machine learning and expert domain knowledge. Journal of Construction Engineering and Management, 150(12): 04024181, ISSN 0733-9364

Astaneh Asl, B (2019) Effects of using virtual reality on AEC team collaboration. PhD thesis, University of Washington, USA.

Atanasov, V; Greenwood, D J; Madebwe, T M and Cox, R (2023) Building time, cost and quality performance of modern methods of construction in a live research project. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Atapattu, C N; Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(3), pp. 388-404. ISSN 1366-4387

Atasoy, G (2013) Visualizing and interacting with construction project performance information. PhD thesis, Carnegie Mellon University, USA.

Atin, A (2016) Project risk propagation modeling of engineering, procurement and construction. PhD thesis, Wayne State University, USA.

Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599

Atkins, J and Wild, A (2000) Automotive facilities procurement and the new construction paradigm. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Atkinson, E; Spillane, J; Bradley, J and Brooks, T (2022) Challenges in the adoption of mobile information communication technology (m-ICT) in the construction phase of infrastructure projects in the UK. International Journal of Building Pathology and Adaptation, 40(3), pp. 327-344. ISSN 23984708

Atmaca, N (2017) Life-cycle assessment of post-disaster temporary housing. Building Research & Information, 45(5), pp. 524-538. ISSN 0961-3218

Atmodiwirjo, P; Ghaziani, R; Wungpatcharapon, S; Djuwita, R and Yatmo, Y A (2025) Nature-related features and children's well-being in post-disaster school design. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 143-156. ISSN 1759-5908

Attalla, M M A M (2000) Reconstruction of operating facilities: A model for project management. PhD thesis, University of Waterloo, Canada.

Au-Yong, C P; Ali, A S and Pavaraj, A (2023) Prioritising the maintenance of university hostels to improve students' satisfaction. Journal of Construction in Developing Countries, 28(1), pp. 151-169. ISSN 1823-6499

Aurellado, E A (2010) ISO 9001.2000 as change strategy for a growing construction company. PhD thesis, Southeast Asia Interdisciplinary Development Institute, Philippines.

Awad, R (2018) Investigation into the effectiveness of construction interventions on the performance of emergency departments within NSW and QLD Health. PhD thesis, University of Newcastle, Australia.

Awodele, I A; Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 19-36. ISSN 1823-6499

Awolusi, I G (2017) Active construction safety leading indicator data collection and evaluation. PhD thesis, University of Alabama, USA.

Awuzie, B and McDermott, P (2016) A systems approach to assessing organisational viability in project-based organisations. Built Environment Project and Asset Management, 6(3), pp. 268-283. ISSN 2044-124X

Ayda Montaser, K and Heidari, S (2021) Optimizing window size by integrating energy and lighting analyses considering occupants' visual satisfaction. Built Environment Project and Asset Management, 11(4), pp. 673-686. ISSN 2044-124X

Aydın, D and Mıhlayanlar, E (2024) Determination of the significance of project delivery attributes (PDAs) on sustainable projects in Turkey. Journal of Engineering, Design and Technology, 22(5), pp. 1682-1703. ISSN 1726-0531

Ayegba, C (2018) Duties and required competencies of a management contractor. Journal of Construction Business and Management, 2(1), pp. 1-9. ISSN 2521-0165

Ayodeji, F J (2014) Evaluation of site managers' hindrances towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(3), pp. 348-363.

Ayodele, O A; Chang-Richards, Y and González, V A (2022) A framework for addressing construction labour turnover in New Zealand. Engineering, Construction and Architectural Management, 29(2), pp. 601-618. ISSN 0969-9988

Ayodele, T O and Olaleye, A (2022) Fundamental sources of uncertainty in real estate development: Perspectives from an emerging market. International Journal of Construction Management, 22(14), pp. 2775-2787. ISSN 1562-3599

Azeez, M; Gambatese, J and Hernandez, S (2019) What do construction workers really want? A study about representation, importance, and perception of US construction occupational rewards. Journal of Construction Engineering and Management, 145(7): 04019040, ISSN 0733-9364

Azhar, N (2014) Integrated construction project delivery system in the U.S. Public sector: An information modeling framework. PhD thesis, Florida International University, USA.

Azhar, S; Lukkad, M Y and Ahmad, I (2013) An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique. International Journal of Construction Education and Research, 9(3), pp. 203-225. ISSN 1557-8771

Azharuddin, M (2019) Integrated carbon emission management for the United Arab Emirates construction industry. PhD thesis, Heriot-Watt University, UK.

Aziz, Hayder (2007) A methodology for the distributed and collaborative management of engineering knowledge. PhD thesis, Cranfield University, UK.

Aziz, Z; Alzaabi, E and Syazli Fathi, M (2023) Prioritisation of resilience criteria and performance indicators for road emergencies crisis response: An analytic hierarchy process (AHP) approach. Journal of Financial Management of Property and Construction, 28(2), pp. 178-205. ISSN 1366-4387

Azizibabani, M (2026) Investigating the interactions of the components affecting the social performance of open spaces in affordable housing projects. International Journal of Construction Management, 26(5), pp. 735-750. ISSN 1562-3599

Azmi, A M (2000) The extent of utilization of geographic information systems in California water utilities for task and decision-making support. DPA thesis, University of La Verne, USA.

Azmy, N (2012) The role of team effectiveness in construction project teams and project performance. PhD thesis, Iowa State University, USA.

Babaeian Jelodar, M; Yiu, T W and Wilkinson, S (2022) Empirical modeling for conflict causes and contractual relationships in construction projects. Journal of Construction Engineering and Management, 148(5): 04022017, ISSN 0733-9364

Babalola, H I and Aliu, J O (2026) Lean construction practices for enhancing project delivery in the construction industry: Examining the beneficial outcomes. International Journal of Construction Management, 26(6), pp. 1097-1111. ISSN 1562-3599

Babar, S; Thaheem, M J and Ayub, B (2017) Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3): 04016104, ISSN 0733-9364

Babatunde, O K (2013) Cross cultural management of quality performance of Chinese construction firms in Nigeria. PhD thesis, National University of Singapore, Singapore.

Babatunde, S O; Perera, S; Ekundayo, D and Adeleye, T E (2020) An investigation into BIM-based detailed cost estimating and drivers to the adoption of BIM in quantity surveying practices. Journal of Financial Management of Property and Construction, 25(1), pp. 61-81. ISSN 1366-4387

Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099

Babu, A.; Krishnan, K.; Dutta, P. and Khan, T. (2026) Multistakeholder SEM-based evaluation of safety factors in road construction projects. Journal of Construction Engineering and Management, 152(7): 04026084, ISSN 0733-9364

Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029

Baden-Hellard, R (1996) The partnering philosophy: A procurement strategy for satisfaction through a teamwork solution to project quality. Journal of Construction Procurement, 2(1), pp. 41-55. ISSN 1358-9180

Badi, S. and Oyedokun, T. (2026) Antecedents and consequences of psychological ownership in tokenised real estate markets. Built Environment Project and Asset Management, 8, pp. 1-20. ISSN 2044-124X

Badi, S (2024) The role of blockchain in enabling inter-organisational supply chain alignment for value co-creation in the construction industry. Construction Management and Economics, 42(3), pp. 266-288. ISSN 01446193

Badi, S and Diamantidou, D (2017) A social network perspective of building information modelling in Greek construction projects. Architectural Engineering and Design Management, 13(6), pp. 406-422. ISSN 1745-2007

Badi, Sulafa M (2012) Sustainable energy innovation (SEI) within private finance initiative (PFI) projects. PhD thesis, University College London, UK.

Badran, S S and Abdallah, A B (2025) Lean vs agile project management in construction: Impacts on project performance outcomes. Engineering, Construction and Architectural Management, 32(5), pp. 2844-2869. ISSN 0969-9988

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Badu, E; Owusu-Manu, D G; Edwards, D J and Holt, G D (2013) Analysis of strategic issues underpinning the innovative financing of infrastructure within developing countries. Journal of Construction Engineering and Management, 139(6), pp. 726-737. ISSN 0733-9364

Bae, J (2025) Supervised learning to covering cost risk through post-construction evaluation of transportation projects by project delivery methods. Engineering, Construction and Architectural Management, 32(9), pp. 5863-5884. ISSN 0969-9988

Bae, S; Asojo, A O and Martin, C S (2020) Impact of occupants' demographics on indoor environmental quality satisfaction in the workplace. Building Research & Information, 48(3), pp. 301-315. ISSN 0961-3218

Bae, S; Martin, C S and Asojo, A O (2021) Higher education students' indoor environmental quality satisfaction benchmark. Building Research & Information, 49(6), pp. 679-694. ISSN 0961-3218

Bae, S; Martin, C S and Asojo, A O (2021) Indoor environmental quality factors that matter to workplace occupants: An 11-year-benchmark study. Building Research & Information, 49(4), pp. 445-459. ISSN 0961-3218

Baghaei, M (2024) Developing a framework and understanding the key influencing factors for the implementation of the internet of things (IoT) in the UK construction sector. PhD thesis, University of Salford, UK.

Bagheri-Zadeh, S H; Kim, H; Hounsell, S; Wood, C R; Soleymani, H and King, M (2007) Field study of concrete maturity methodology in cold weather. Journal of Construction Engineering and Management, 133(11), pp. 827-835. ISSN 0733-9364

Bai, Y (2007) Intelligent painting process planner for robotic bridge painting. Journal of Construction Engineering and Management, 133(4), pp. 335-342. ISSN 0733-9364

Bai, Y and Amirkhanian, S N (1994) Knowledge-based expert system for concrete mix design. Journal of Construction Engineering and Management, 120(2), pp. 357-373. ISSN 0733-9364

Bai, Y and Bernold, L E (2001) Quality control parameters for robotic bridge painting. Journal of Construction Engineering and Management, 127(2), pp. 142-148. ISSN 0733-9364

Baiden, B K (2006) Framework for the integration of the project delivery team. PhD thesis, Loughborough University, UK.

Baiden, B K; Price, A D F and Dainty, A R J (2003) Looking beyond processes: Human factors in team integration. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Baienat, S. and Iordanova, I. (2026) Quantifying building adaptability and circular performance through BIM: The adaptation intensity index (AII), circular adaptability performance (CAP), and digital adaptability passport (DAP). Smart and Sustainable Built Environment, pp. 1-22. ISSN 2046-6099

Bajjou, M S and Chafi, A (2022) Exploring the critical waste factors affecting construction projects. Engineering, Construction and Architectural Management, 29(6), pp. 2268-2299. ISSN 0969-9988

Bakar, F A; Cheung, C M; Kaltungo, A Y; Mohandes, S R and Lou, E (2024) Key organisational attributes for developing a maturity model: Adopting immersive technologies in construction safety training. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Baker, H (2021) A multimethod approach to learning from text-based construction failure data. PhD thesis, University of Edinburgh, UK.

Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ball, M and Chambers, M (2009) An incentivisation scheme for a major transportation infrastructure project in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Ballard, G (2002) Managing work flow on design projects: A case study. Engineering, Construction and Architectural Management, 9(3), pp. 284-291. ISSN 0969-9988

Ballard, G; Harper, N and Zabelle, T (2003) Learning to see work flow: An application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), pp. 6-14. ISSN 0969-9988

Ballard, G and Howell, G (1998) Shielding production: Essential step in production control. Journal of Construction Engineering and Management, 124(1), pp. 11-17. ISSN 0733-9364

Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.

Bamana, F; Lehoux, N and Cloutier, C (2019) Simulation of a construction project: Assessing impact of just-in-time and lean principles. Journal of Construction Engineering and Management, 145(5): 05019005, ISSN 0733-9364

Bambrick, B (1994) Construction of an island. Journal of Construction Engineering and Management, 120(1), pp. 223-227. ISSN 0733-9364

Bamford, N; Charters, W; Lacey, R; Mills, A; Radovic, D; Robinson, J; Williams, P and Yencken, D (1998) Environment and sustainability in commercial office buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bamgbade, J A; Nawi, M N M; Kamaruddeen, A M; Adeleke, A Q and Salimon, M G (2022) Building sustainability in the construction industry through firm capabilities, technology and business innovativeness: Empirical evidence from Malaysia. International Journal of Construction Management, 22(3), pp. 473-488. ISSN 1562-3599

Bamisile, A (1991) A communication system approach to the management of quality in construction. PhD thesis, Open University, UK.

Banawi, A A (2013) Improving construction processes by integrating lean, green, and six-sigma. PhD thesis, University of Pittsburgh, USA.

Bandara, S G D K; Abdeen, F N; Disaratna, V and Perera, B A K S (2022) Employee welfare and job satisfaction in the Sri Lankan hotel industry. International Journal of Construction Management, 22(15), pp. 3045-3054. ISSN 1562-3599

Banham, G P (2009) Improving knowledge retention and use in construction project team environments: a soft systems methodology approach. PhD thesis, University of Surrey, UK.

Bani Hashemi Chaharom, Seyed Yaser (2014) The choice and effects of governance mechanisms for regulating client-contractor relationships in large construction projects. PhD thesis, University of Sydney, Australia.

Banihashemi, S; Assadimoghadam, A; Hajirasouli, A; LeNguyen, K and Mohandes, S R (2025) Parametric design in construction: A new paradigm for quality management and defect reduction. International Journal of Construction Management, 25(13), pp. 1534-1551. ISSN 1562-3599

Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(1), pp. 1-18. ISSN 1562-3599

Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice. PhD thesis, Coventry University, UK.

Bapat, H; Sarkar, D and Gujar, R (2023) Application of multi-criteria decision making for evaluation of key performance indicators of integrated project delivery and BIM model for an infrastructure transportation project in Western India. International Journal of Construction Management, 23(12), pp. 2077-2086. ISSN 1562-3599

Barajei, C; Appiah-Kubi, E; Kheni, N A; Yalley, P P K and Iddrisu, W (2024) Success factors of pre-construction stages of Ghanaian public road construction project life cycle. International Journal of Construction Management, 24(13), pp. 1444-1453. ISSN 1562-3599

Barbarosoglu, B V (2018) Early detection of maintainability issues in MEP systems using BIM. PhD thesis, Illinois Institute of Technology, USA.

Barbosa, Adriano Aurelio Ribeiro (2014) Implementing a sound power method for testing noise on masonry saw. PhD thesis, Universidade Estadual de Campinas, Brazil.

Barbosa, Ava Santana (2010) Use of performance indicators in Brazilian construction firms: Diagnoses and orientations for utilization. PhD thesis, Universidade de São Paulo, Brazil.

Barbosa, Elisabeti de Fátima Teixeira (2024) Influence of user's behavior on thermoenergetic performance in higher education buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.

Barcia, R M (1985) Construction production planning and optimal control. PhD thesis, University of Waterloo, Canada.

Barlow, P L (2015) Assessment of subcontractor quality on California hospital construction projects through third-party inspections. PhD thesis, University of Florida, USA.

Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal. PhD thesis, University of Southampton, UK.

Barrett, J; Goulding, J and Qualter, P (2013) The social life of the novel idea: What did social psychologists ever do for us? Engineering, Construction and Architectural Management, 20(3), pp. 250-266. ISSN 0969-9988

Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(2), pp. 201-215. ISSN 0969-9988

Barth, Karina Bertotto (2023) Performance measurement systems to support the implementation of the lean philosophy in production management in construction. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Bartley, T; McMahon, C and Denton, S (2016) Information flows in highway project delivery. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Barutha, P J (2018) Integrated project delivery for industrial projects. PhD thesis, Iowa State University, USA.

Bascoul, A M (2017) Managing project structural complexity by integrating facility management in planning, designing, and execution of high-end facility upgrades. PhD thesis, University of California, Berkeley, USA.

Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364

Basma Ben, M; Lehoux, N and Blanchet, P (2024) Integration mechanisms for material suppliers in the construction supply chain: A systematic literature review. Construction Management and Economics, 42(1), pp. 70-107. ISSN 01446193

Bassanino, M; Fernando, T and Wu, K C (2014) Can virtual workspaces enhance team communication and collaboration in design review meetings? Architectural Engineering and Design Management, 10(3-4), pp. 200-217. ISSN 1745-2007

Bassioni, H A (2004) A framework for measuring business performance in construction contracting organisations. PhD thesis, Loughborough University, UK.

Bataglin, Fernanda Saidelles (2023) Prescriptive conceptual framework for planning and controlling engineer-to-order industrialized building systems. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Batarseh, Sana (2025) An approach to adjusting design build for the modern construction industry. PhD thesis, Arizona State University, USA.

Batarseh, Shadi (2024) Digital twin for digital asset management: Asset information model characteristics and digital capabilities for smart functions, sydney metro case study. PhD thesis, University of New South Wales, Australia.

Battikha, M (2000) A computer-based system for construction quality management with application to highway pavements. PhD thesis, University of British Columbia, Canada.

Battikha, M G (2002) Qualicon: Computer-based system for construction quality management. Journal of Construction Engineering and Management, 128(2), pp. 164-173. ISSN 0733-9364

Battikha, M G (2008) Reasoning mechanism for construction nonconformance root-cause analysis. Journal of Construction Engineering and Management, 134(4), pp. 280-288. ISSN 0733-9364

Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.

Bavafa, M (2015) Enhancing information quality through building information modelling implementation within UK structural engineering organisations. PhD thesis, University of Salford, UK.

Baweshkha, Monair Ali (2021) Integrating project management office and organisational change management processes for better implementation and adoption of e-health strategy in Saudi Arabia. PhD thesis, RMIT University, Australia.

Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.

Bayar, M S (2019) BIM-enabled recommendations for digital handover process in the highways sector. PhD thesis, University of Salford, UK.

Bayhan, H G (2025) Transaction costs in construction project team communications: Language model and network science applications. PhD thesis, Michigan State University, USA.

Bayraktar, M E (2006) A decision model to determine the optimal time-cost trade off in highway work zone projects. PhD thesis, Purdue University, USA.

Bayraktar, M E and Hastak, M (2009) Bayesian belief network model for decision making in highway maintenance: Case studies. Journal of Construction Engineering and Management, 135(12), pp. 1357-1369. ISSN 0733-9364

Bayraktar, M E; Hastak, M; Gokhale, S and Safi, B (2011) Decision tool for selecting the optimal techniques for cost and schedule reduction in capital projects. Journal of Construction Engineering and Management, 137(9), pp. 645-655. ISSN 0733-9364

Bazzan, J; Echeveste, M; Formoso, C T and Kowalski, J D S (2024) A data-driven customer complaint management model for residential building companies. Architectural Engineering and Design Management, 20(6), pp. 1381-1402. ISSN 1745-2007

Beach, T; Yeung, J; Ghoroghi, A and Rezgui, Y (2025) Moving automated compliance checking to the operational phase of the building life-cycle: analysis and feasibility study in the UK. International Journal of Construction Management, 25(7), pp. 840-849. ISSN 1562-3599

Beadle, K (2008) Analysis of the design process for low-energy housing. PhD thesis, De Montfort University, UK.

Beadle, K; Gibb, A; Austin, S; Fuster, A and Madden, P (2008) Adaptable futures: Sustainable aspects of adaptable buildings. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Beainy, F; Commuri, S and Zaman, M (2012) Quality assurance of hot mix asphalt pavements using the intelligent asphalt compaction analyzer. Journal of Construction Engineering and Management, 138(2), pp. 178-187. ISSN 0733-9364

Bechem, E E (2023) A human touch to public-private partnerships for sustainable infrastructure development in the central African sub-region. PhD thesis, University of Manchester, UK.

Becker, T C (2012) Improving the predictability of construction project outcomes through project level indirect construction cost practices. PhD thesis, North Carolina State University, USA.

Bekele, A A and Mahesh, G (2025) Impact of contractor development programs on the competency of small and medium contractors in Ethiopia. International Journal of Construction Education and Research, 21(1), pp. 94-116. ISSN 1557-8771

Belayutham, S; Ibrahim, K I and Hussain, A (2019) Shaping the future of prevention through design (PTD) practice in the Malaysian construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Bellizzi, J A (1978) A multivariate analysis of buying in the commercial construction industry. PhD thesis, University of Nebraska - Lincoln, USA.

Bello, A O; Abdulraheem, A A; Afolabi, O P; Aka, A and Gbenga, P O (2024) Assessing the underlying factors affecting trust and transparency in the construction industry: A mixed method approach. Construction Economics and Building, 24(1-2), pp. 3-28. ISSN 2204-9029

Bello, A O and Ayegba, C (2025) Drivers for the adoption of building information modelling (BIM) for post-construction management in the Nigerian aeco industry. Journal of Financial Management of Property and Construction, 30(1), pp. 137-153. ISSN 1366-4387

Bello, A O and Ayegba, C (2025) Adoption of building information modelling for post-construction in Nigeria: Examination of barriers and strategies development. International Journal of Building Pathology and Adaptation, 43(6), pp. 1501-1521. ISSN 2398-4708

Bello, M A (2012) Minimizing impediments to design for construction safety (DFCS) implementation on capital projects. PhD thesis, Carnegie Mellon University, USA.

Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bello W A, O K T (2013) Weak management of the predictability of contingency allowance in construction projects in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ben Mahmoud, B; Lehoux, N; Blanchet, P and Jobidon, G (2026) Towards a resilient project delivery system selection: Evaluating the impact of external environment criteria for public infrastructure in quebec. Construction Management and Economics, 44(3), pp. 159-182. ISSN 0144-6193

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.

Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193

Benn, M and Stoy, C (2024) Challenges impairing the data quality of information deliverables in BIM during the planning phase of office buildings in Germany. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Berry, S; Sharp, A; Hamilton, J and Killip, G (2014) Inspiring low-energy retrofits: The influence of open home events. Building Research & Information, 42(4), pp. 422-433. ISSN 0961-3218

Besklubova, S; Zhong, R Y and Tan, B Q (2025) An integrated model of a prefabrication hub feasibility assessment: A Hong Kong case. International Journal of Construction Management, 25(11), pp. 1300-1312. ISSN 1562-3599

Besser, D (2006) The experience of women in construction management: A hermeneutic phenomenological study. PhD thesis, University of Minnesota, USA.

Beyh, S (2004) Computer and communication engineering: internet protocol telephony in construction. PhD thesis, University of Salford, UK.

Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.

Bhavsar, V; Thomas Alex, S; Vaishnav, P K; Jose, A; Koshy, N G and Atiwadkar, S (2022) Investigation of critical factors influencing construction of airports: The case of India. International Journal of Construction Management, 22(15), pp. 2905-2913. ISSN 1562-3599

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Bibby, L (2003) Improving design management techniques in construction. EngD thesis, Loughborough University, UK.

Bibby, L; Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(1), pp. 7-26. ISSN 0969-9988

Bijleveld, Frank (2015) Professionalising the asphalt construction process: Aligning information technologies, operators' knowledge and laboratory practices. PhD thesis, University of Twente, Netherlands.

Bijleveld F R, D e A G (2013) Method-based learning: A case in the asphalt construction industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Bilbo, D; Bigelow, B; Escamilla, E and Lockwood, C (2015) Comparison of construction manager at risk and integrated project delivery performance on healthcare projects: A comparative case study. International Journal of Construction Education and Research, 11(1), pp. 40-53. ISSN 1557-8771

Bildsten, L (2016) Purchasing in construction companies. PhD thesis, Lund University, Sweden.

Bilec, M M (2007) A hybrid life cycle assessment model for construction processes. PhD thesis, University of Pittsburgh, USA.

Bilec, Melissa M (2007) A hybrid life cycle assessment model for construction processess. PhD thesis, University of Pittsburgh, USA.

Bilge, E C and Yaman, H (2021) Information management roles in real estate development lifecycle: Literature review on BIM and IPD framework. Construction Innovation, 21(4), pp. 723-742. ISSN 1471-4175

Bingham, E (2014) Analysis of the state of practice and best practices for alternative project delivery methods in the transportation design and construction industry. PhD thesis, Arizona State University, USA.

Bingham, E; Edward Gibson, G and El Asmar, M (2019) Identifying team selection and alignment factors by delivery method for transportation projects. Journal of Construction Engineering and Management, 145(10): 04019061, ISSN 0733-9364

Bingham, E; Gibson, G E and Asmar, M E (2018) Measuring user perceptions of popular transportation project delivery methods using least significant difference intervals and multiple range tests. Journal of Construction Engineering and Management, 144(6): 04018033, ISSN 0733-9364

Bingol, B N; Arditi, D and Polat, G (2024) A performance-based subcontractor selection model. Journal of Construction Engineering and Management, 150(8): 04024079, ISSN 0733-9364

Bingol, B N and Polat, G (2020) Framework for evaluating quality performances of subcontractors: Case of Turkish contractors. Journal of Construction in Developing Countries, 25(1), pp. 163-179. ISSN 1823-6499

Bingol, B N; Arditi, D and Polat, G (2025) Subcontractor selection for a construction project: Optimal plan. Journal of Construction Engineering and Management, 151(12): 04025205, ISSN 0733-9364

Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.

Birchall, S J (2011) An appraisal of the performance of a 'green' office building. PhD thesis, University of Leeds, UK.

Birrell, George Selbie (1978) The criteria by which construction prime and subcontractors evaluate the management performance of each other. DArch thesis, University of Michigan, USA.

Black, Warren (2023) Investigating a complex systems theory approach to controlling risk within complex projects. PhD thesis, Queensland University of Technology, Australia.

Blacud, N A; Bogus, S M; Diekmann, J E and Molenaar, K R (2009) Sensitivity of construction activities under design uncertainty. Journal of Construction Engineering and Management, 135(3), pp. 199-206. ISSN 0733-9364

Blanchard, F L (1992) Construction industry organization, labor relations and productivity. PhD thesis, Massachusetts Institute of Technology, USA.

Blismas, N; Sher, W; Thorpe, A and Baldwin, A (2004) A typology for clients' multi-project environments. Construction Management and Economics, 22(4), pp. 357-371. ISSN 01446193

Blismas, N G (2001) Multi project environments of construction clients. PhD thesis, Loughborough University, UK.

Blismas, N G; Sher, W D; Thorpe, A and Baldwin, A N (2004) Factors influencing project delivery within construction clients' multi-project environments. Engineering, Construction and Architectural Management, 11(2), pp. 113-125. ISSN 0969-9988

Blyth, K; Lewis, J and Kaka, A (2004) Developing a framework for a standardized works programme for building projects. Construction Innovation, 4(4), pp. 193-210. ISSN 1471-4175

Boateng, A; Ameyaw, C and Mensah, S (2022) Assessment of systematic risk management practices on building construction projects in Ghana. International Journal of Construction Management, 22(16), pp. 3128-3136. ISSN 1562-3599

Boateng, P; Omotayo, T; Osunsanmi, T and Ekundayo, D (2025) Socio-ecological risks management dynamic simulation in megaproject development of the edinburgh tram network. International Journal of Building Pathology and Adaptation, 43(1), pp. 75-92. ISSN 2398-4708

Boerkoel, S; Gledson, B; Littlemore, M and Ponton, H (2022) Challenges of organisational learning in a Netherlands project-based organisation. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Bogus, S M (2004) Concurrent engineering strategies for reducing design delivery time. PhD thesis, University of Colorado at Boulder, USA.

Bogus, S M; Diekmann, J E; Molenaar, K R; Harper, C; Patil, S and Lee, J S (2011) Simulation of overlapping design activities in concurrent engineering. Journal of Construction Engineering and Management, 137(11), pp. 950-957. ISSN 0733-9364

Bogus, S M; Molenaar, K R and Diekmann, J E (2005) Concurrent engineering approach to reducing design delivery time. Journal of Construction Engineering and Management, 131(11), pp. 1179-1185. ISSN 0733-9364

Bogus, S M; Molenaar, K R and Diekmann, J E (2006) Strategies for overlapping dependent design activities. Construction Management and Economics, 24(8), pp. 829-837. ISSN 1466433X

Bonilla, M; Castelblanco, G and Rasdorf, W (2026) The paradox of project performance: The role of procurement, contextual, and contractor-related factors. Journal of Construction Engineering and Management, 152(6): 04026062, ISSN 0733-9364

Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective. PhD thesis, University of Wisconsin - Madison, USA.

Boonyanan, A; Robinson, H; Fong, D and Naoum, S (2008) Relationship and knowledge management among construction development project members in Thailand: The clients' perspective. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Bordalo Faustino, P (2017) Public procurement award criteria in the EU member states: a comparative study of the discretionary powers of contracting authorities. PhD thesis, University of Nottingham, UK.

Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques. Building Research & Information, 33(4), pp. 347-352. ISSN 0961-3218

Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 3: Case studies of the use of techniques in the feedback portfolio. Building Research & Information, 33(4), pp. 361-375. ISSN 0961-3218

Borges, D B; Soares, C A P; Najjar, M; Costa, B B F D; Tam, V W Y and Haddad, A N (2025) Project success and critical success factors of construction projects from the perspective of a multicultural team: A case study in Guyana. International Journal of Construction Management, 25(10), pp. 1115-1129. ISSN 1562-3599

Borhani, A; Borhani, A; Dossick, C S and Jupp, J (2024) An ontological analysis for comparison of the concepts of sustainable building and intelligent building. Journal of Construction Engineering and Management, 150(4): 04024014, ISSN 0733-9364

Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.

Bortolini, R and Forcada, N (2020) Analysis of building maintenance requests using a text mining approach: Building services evaluation. Building Research & Information, 48(2), pp. 207-217. ISSN 0961-3218

Bosch, A; Volker, L and Koutamanis, A (2015) BIM in the operations stage: Bottlenecks and implications for owners. Built Environment Project and Asset Management, 5(3), pp. 331-343. ISSN 2044-124X

Bosch-Sijtsema, P and Buser, M (2017) Construction and demolition waste management on the building site: A literature review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Bosche, F N (2008) Automated recognition of three-dimensional CAD model objects in dense laser range point clouds. PhD thesis, University of Waterloo, Canada.

Bostan, B. B.; Çavka, H. B.; Citipitioglu, A. M. and Pehlivan, D. Z. (2026) Retrospective BIM performance analysis based on construction big data. Engineering, Construction and Architectural Management, 33(7), pp. 5991-6013. ISSN 0969-9988

Botha, P S; van der Walt, J D; Scheepbouwer, E and Barutha, P J (2024) A tool for reporting the optimal timing of preconstruction services in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 240-252. ISSN 17514304

Bouazza, T (2019) The design of healthcare facilities: knowledge, methods and effectiveness. PhD thesis, Northumbria University, UK.

Bouazza, T and Greenwood, D (2020) An investigation of performance gaps in the design of UK healthcare facilities. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Bouchlaghem, D; Shang, H; Anumba, C J; Cen, M; Miles, J and Taylor, M (2005) ICT-enabled collaborative working environment for concurrent conceptual design. Architectural Engineering and Design Management, 1(4), pp. 261-280. ISSN 1745-2007

Boudeau, C (2013) Design team meetings and the coordination of expertise: The roof garden of a hospital. Construction Management and Economics, 31(1), pp. 78-89. ISSN 1466433X

Boudlal, Youssef Ait (2014) Project management and its relation to long-term project success: An empirically based theoretical framework. PhD thesis, University of Louisville, USA.

Bouhmoud, H; Loudyi, D and Azhar, S (2024) Building information modeling (BIM) for lifecycle carbon emission: Scientometric and scoping literature reviews. Smart and Sustainable Built Environment, 13(6), pp. 1349-1369. ISSN 2046-6099

Bouraoui, D and Lizarralde, G (2013) Centralized decision making, users' participation and satisfaction in post-disaster reconstruction: The case of Tunisia. International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 145-167. ISSN 1759-5916

Bourdakis, V (1994) Performance appraisal of sportshall and swimming pool buildings in Greece. PhD thesis, University of Bath, UK.

Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.

Boutfskis, V and Fellows, R F (1997) Appraising the performance of long span sportshalls and swimming pools in Greece. Journal of Financial Management of Property and Construction, 2(2), pp. 39-58. ISSN 1366-4387

Bowen, P and Cattell, K (2008) Job satisfaction of South African quantity surveyors. Engineering, Construction and Architectural Management, 15(3), pp. 260-269. ISSN 0969-9988

Bowen, P; Cattell, K; Distiller, G and Edwards, P J (2008) Job satisfaction of South African quantity surveyors: An empirical study. Construction Management and Economics, 26(7), pp. 765-780. ISSN 1466433X

Bowen, P; Cattell, K; Michell, K and Edwards, P (2008) Job satisfaction of South Africa quantity surveyors: Are employers happier than employees? Journal of Engineering, Design and Technology, 6(2), pp. 124-144. ISSN 1726-0531

Bowen, P; Jay, I; Cattell, K and Edwards, P (2010) Value management awareness and practice by South African architects: An empirical study. Construction Innovation, 10(2), pp. 203-222. ISSN 1471-4175

Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(1), pp. 60-74. ISSN 0969-9988

Boyd, D and Foss, P (1997) Developing intimacy in construction industry groups. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Boyd, P; Larsen, G D and Schweber, L (2014) Perspectives on the specification of building integrated photovoltaic (BIPV) technology in construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Boyes, Mark (2019) Embedding divergent thinking into project team decision making. PhD thesis, RMIT University, Australia.

Brady, D A (2014) Using visual management to improve transparency in planning and control in construction. PhD thesis, University of Salford, UK.

Brady, D A; Tzortzopoulos, P; Rooke, J; Formoso, C T and Tezel, A (2018) Improving transparency in construction management: A visual planning and control model. Engineering, Construction and Architectural Management, 25(10), pp. 1277-1297. ISSN 0969-9988

Brand, M C and Uher, T (2010) Follow-up empirical study of the performance of the New South Wales construction industry security of payment legislation. International Journal of Law in the Built Environment, 2(1), pp. 7-25. ISSN 1756-1450

Brandín, R and Abrishami, S (2021) Information traceability platforms for asset data lifecycle: Blockchain-based technologies. Smart and Sustainable Built Environment, 10(3), pp. 364-386. ISSN 2046-6099

Bray Jr., H G (1994) Domestic construction contractors and ISO 9000 registration. DE thesis, Louisiana Tech University, USA.

Brennan, M D (2011) Integrated project delivery: A normative model for value creation in complex military medical projects. PhD thesis, University of Illinois, USA.

Bresnen, M and Marshall, N (1998) Partnering strategies and organizational cultures in the construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Brewer, G (2008) Innovation and attitude: mapping the profile of ICT decision-makers in architectural, engineering and construction firms. PhD thesis, University of Newcastle, Australia.

Brewer, G and Gajendran, T (2012) Attitudes, behaviours and the transmission of cultural traits: Impacts on ICT/BIM use in a project team. Construction Innovation, 12(2), pp. 198-215. ISSN 1471-4175

Brewer, G; Gajendran, T and Runeson, G (2013) ICT & innovation: A case of integration in a regional construction firm. Construction Economics and Building, 13(3), pp. 24-36. ISSN 2204-9029

Briggs, B (2021) An improved earned value management method integrating quality and safety. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Brncich, A; Shane, J S; Strong, K C and Passe, U (2011) Using integrated student teams to advance education in sustainable design and construction. International Journal of Construction Education and Research, 7(1), pp. 22-40. ISSN 1557-8771

Brodetskaia, I; Sacks, R and Shapira, A (2013) Stabilizing production flow of interior and finishing works with reentrant flow in building construction. Journal of Construction Engineering and Management, 139(6), pp. 665-674. ISSN 0733-9364

Brooks, T (2020) Implementation and effectiveness of the ISO 9001 quality management system in the construction sector in the UK and Ireland. PhD thesis, Queen's University Belfast, UK.

Brooks, T; Gunning, J G; Spillane, J P and Cole, J (2021) Regulatory decoupling and the effectiveness of the ISO 9001 quality management system in the construction sector in the UK–a case study analysis. Construction Management and Economics, 39(12), pp. 988-1005. ISSN 01446193

Brooks, T and McIlwaine, S (2021) Why does anyone want to work in the UK construction industry? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Brooks, T and Spillane, J (2016) Does inappropriate quality control demotivate workers? A critical review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Brooks, T and Spillane, J (2017) Lies, damned lies and quality management systems: A pilot case study. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Brosque, C; Skeie, G and Fischer, M (2021) Comparative analysis of manual and robotic concrete drilling for installation hangers. Journal of Construction Engineering and Management, 147(3): 05021001, ISSN 0733-9364

Brown, C and Gorgolewski, M (2015) Understanding the role of inhabitants in innovative mechanical ventilation strategies. Building Research & Information, 43(2), pp. 210-221. ISSN 0961-3218

Brown, D C (2003) A methodology for selecting the construction team. PhD thesis, University of Southampton, UK.

Brunet, M; Motamedi, A; Guénette, L M and Forgues, D (2019) Analysis of BIM use for asset management in three public organizations in Québec, Canada. Built Environment Project and Asset Management, 9(1), pp. 153-167. ISSN 2044-124X

Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.

Brunso, T P and Siddiqi, K M (2003) Using benchmarks and metrics to evaluate project delivery of environmental restoration programs. Journal of Construction Engineering and Management, 129(2), pp. 119-130. ISSN 0733-9364

Bryde, D J (2000) Project management: uses, structures, systems and influences. PhD thesis, Liverpool John Moores University, UK.

Bråthen, K and Moum, A (2016) Bridging the gap: Bringing BIM to construction workers. Engineering, Construction and Architectural Management, 23(6), pp. 751-764. ISSN 0969-9988

Bu, Z; Liu, J and Lu, Z (2025) Research on dynamic profit distribution mechanism and options in PPP project value creation. Journal of Construction Engineering and Management, 151(12): 04025190, ISSN 0733-9364

Bu Jawdeh, H M (2013) Improving the integration of building design and facilities management. PhD thesis, University of Salford, UK.

Bu-Qammaz, A S A S (2015) Risk management model for international public construction joint venture projects in Kuwait. PhD thesis, Ohio State University, USA.

Budawara, N (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University, Canada.

Bula-Diaz, C; Dainty, A and Burns, N (2005) The employment relationship of site and office-based managers in SME construction firms. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Bulut, M; Wilkinson, S; Khan, A; Jin, X H and Lee, C L (2021) Perceived benefits of retrofitted residential secondary glazing: An exploratory Australian study. International Journal of Building Pathology and Adaptation, 39(5), pp. 720-733. ISSN 23984708

Burati, J L; Farrington, J J and Ledbetter, W B (1992) Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), pp. 34-49. ISSN 0733-9364

Burke, R D (2018) Early design decisions in building materials for higher performing buildings. PhD thesis, Arizona State University, USA.

Buser, M and Koch, C (2012) Women at top level management at contractors in Denmark and Norway. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Butcher, D C A and Sheehan, M J (2010) Excellent contractor performance in the UK construction industry. Engineering, Construction and Architectural Management, 17(1), pp. 35-45. ISSN 0969-9988

Butkovic, B (2019) A framework for developing 4D level-of-detail on construction projects. PhD thesis, University of Wolverhampton, UK.

Butler, C J (2005) The relationship between emotional intelligence and transformational leadership behavior in construction industry leaders. PhD thesis, University of Colorado at Boulder, USA.

Bweupe, A S and Mwiya, B (2024) Quality management in ready-mix concrete production in Zambia. Journal of Construction Business and Management, 7(1), pp. 1-15. ISSN 2521-0165

Bynum, P; Issa, R R A and Olbina, S (2013) Building information modeling in support of sustainable design and construction. Journal of Construction Engineering and Management, 139(1), pp. 24-34. ISSN 0733-9364

Bypaneni, S P K (2017) A Bayesian network-based decision framework for selecting project delivery methods in highway construction. PhD thesis, University of Kansas, USA.

Böhme, T; Escribano, A; Heffernan, E E and Beazley, S (2018) Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector. Built Environment Project and Asset Management, 8(3), pp. 253-266. ISSN 2044-124X

Cabahug, Ruel R (2003) A profile for classifying plant operator maintenance proficiency. PhD thesis, Loughborough University, UK.

Caetano, I.; Pinto, D.; Amândio, M.; Silva, J.; Sanhudo, L.; Azenha, M.; El Sibaii, M.; Granja, J.; Patrício, H.; Ganhão, F. and Poças Martins, J. (2026) Algorithmic workflow for digitising inspection data in railway tunnel maintenance. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Cai, H; Kuczek, T; Dunston, P S and Li, S (2017) Correlating intelligent compaction data to in situ soil compaction quality measurements. Journal of Construction Engineering and Management, 143(8): 04017038, ISSN 0733-9364

Cai, J; Li, Z; Dou, Y; Teng, Y and Yuan, M (2023) Contractor selection for green buildings based on the fuzzy kano model and TOPSIS: A developer satisfaction perspective. Engineering, Construction and Architectural Management, 30(10), pp. 5073-5108. ISSN 0969-9988

Calahorra Jiménez, M I (2020) Advancing knowledge of design-build and best-value in highway projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Caldas, C and Gupta, A (2017) Critical factors impacting the performance of mega-projects. Engineering, Construction and Architectural Management, 24(6), pp. 920-934. ISSN 0969-9988

Cameron, I and Hare, B (2008) Planning tools for integrating health and safety in construction. Construction Management and Economics, 26(9), pp. 899-909. ISSN 1466433X

Campbell, J M (2008) Safety hazard and risk identification and management in infrastructure management. PhD thesis, University of Edinburgh, UK.

Campion, N A (2015) Advancing life cycle assessment: Perspectives from the building and healthcare industries. PhD thesis, University of Pittsburgh, USA.

Camrass, K (2022) Urban regenerative thinking and practice: A systematic literature review. Building Research & Information, 50(3), pp. 339-350. ISSN 0961-3218

Candido, C; Kim, J; de Dear, R and Thomas, L (2016) BOSSA: A multidimensional post-occupancy evaluation tool. Building Research & Information, 44(2), pp. 214-228. ISSN 0961-3218

Candido, C; Thomas, L; Haddad, S; Zhang, F; Mackey, M and Ye, W (2019) Designing activity-based workspaces: Satisfaction, productivity and physical activity. Building Research & Information, 47(3), pp. 275-289. ISSN 0961-3218

Cao, D (2025) Coupling risk assessment method of accident causative factors in building construction. Journal of Construction Engineering and Management, 151(11): 04025184, ISSN 0733-9364

Cardin, M-A (2011) Quantitative performance-based evaluation of a procedure for flexible design concept generation. PhD thesis, Massachusetts Institute of Technology, USA.

Cargnelutti, Dejan (2025) 4IR technologies within germany’s construction sector to meet fire protection standards and international climate objectives: A multiple-case study. PhD thesis, European Institute of Management, Malta.

Carmo, Cristiano Saad Travassos do (2023) A hybrid solution using stochastic and neural networks modeling for the consideration of safety uncertainties in construction planning methods. PhD thesis, Pontifícia Universidade Católica do Rio de Janeiro, Brazil.

Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.

Carpenter, N and Bausman, D C (2016) Project delivery method performance for public school construction: Design-bid-build versus CM at risk. Journal of Construction Engineering and Management, 142(10): 05016009, ISSN 0733-9364

Carrasco, S; Ochiai, C and Okazaki, K (2017) Residential satisfaction and housing modifications: A study in disaster-induced resettlement sites in Cagayan de Oro, Philippines. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 175-189. ISSN 1759-5916

Carrick, D (2022) How factors of collaboration affect delivery of construction projects with a high degree of reliance on building services: an action research and cross-case study analysis of Edinburgh primary schools. DProf thesis, University of Salford, UK.

Carrillo, P (2004) Managing knowledge: Lessons from the oil and gas sector. Construction Management and Economics, 22(6), pp. 631-642. ISSN 01446193

Carroll, L C (2024) Framework to develop a credible final accounts system for South African construction projects. PhD thesis, University of Pretoria, South Africa.

Carter, K and Fortune, C (2003) Procuring sustainable projects: A grounded approach. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Carvajal-Figueroa, A (2006) The identification and measurement of the benefits of visualization technologies during the briefing process. PhD thesis, University of Reading, UK.

Carvalho, R; Zhang, F; Liu, T; Yu, R; Chen, E and Oh, E (2026) Amenity preferences and design evaluation in Australian build-to-rent compact apartments: A VR/EEG study. Building Research & Information, 54(2), pp. 158-178. ISSN 0961-3218

Casady, C B (2019) Assessing public-private partnership (PPP) governance, institutionalization, and market maturity in the United States and abroad. PhD thesis, Stanford University, USA.

Cass, D and Mukherjee, A (2011) Calculation of greenhouse gas emissions for highway construction operations by using a hybrid life-cycle assessment approach: Case study for pavement operations. Journal of Construction Engineering and Management, 137(11), pp. 1015-1025. ISSN 0733-9364

Castañeda, J A; Tucker, R L and Haas, C T (2005) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Journal of Construction Engineering and Management, 131(7), pp. 799-807. ISSN 0733-9364

Castillo, T; Alarcón, L F and Salvatierra, J L (2018) Effects of last planner system practices on social networks and the performance of construction projects. Journal of Construction Engineering and Management, 144(3): 04017120, ISSN 0733-9364

Castillo, T; Herrera, R F and Alarcón, L F (2023) The quality of small social networks and their performance in architecture design offices. Journal of Construction Engineering and Management, 149(2): 04022162, ISSN 0733-9364

Castillo Campoverde, T O (2018) Multidimensional analysis of the interaction between the organization, management pratices and performance in construction. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Castro, L; De Vecchi, R and Lamberts, R (2025) Design process for an occupant survey system to assess satisfaction with indoor environmental quality. Building Research & Information, 53(1-2), pp. 242-260. ISSN 0961-3218

Castro-Lacouture, D (2003) B2b e-work intranet solution design for rebar supply interactions. PhD thesis, Purdue University, USA.

Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.

Cattaneo, S and Mola, F (2012) Assessing the quality control of self-consolidating concrete properties. Journal of Construction Engineering and Management, 138(2), pp. 197-205. ISSN 0733-9364

Cattell, K; Bowen, P and Edwards, P (2016) Stress among South African construction professionals: A job demand-control-support survey. Construction Management and Economics, 34(10), pp. 700-723. ISSN 01446193

Caven, V and Diop, M (2012) Architecture: A 'rewarding' career? An Anglo-French comparative study of intrinsic rewards in the architecture profession. Construction Management and Economics, 30(7), pp. 513-523. ISSN 1466433X

Caven, V and Raidén, A B (2010) Work-life balance among architects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Cecilia, M M (2016) Requirements for the effective statutory adjudication practice in the South African construction industry. PhD thesis, University of Pretoria, South Africa.

Cedstrand, E (2023) Evaluating occupational health interventions: Design, implementation, and effects. PhD thesis, Karolinska Institutet, Sweden.

Celoza, A and Alazzam, M (2026) Managing risk, innovation, and collaboration through supplier qualification. Journal of Construction Engineering and Management, 152(1): 04025223, ISSN 0733-9364

Celoza, Amelia McLean (2022) The impact of contractual and legal factors on information management in AEC project delivery. PhD thesis, University of Texas at Austin, USA.

Cemesova, A (2013) Enhancing BIM-based data transfer to support the design of low energy buildings. PhD thesis, Cardiff University, UK.

Cepeda, D M; Sohail, M and Ogunlowo, O O (2018) Understanding the critical success factors for delivery of megaprojects in Colombia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 45-57. ISSN 17514304

Cerić, A and Ivić, I (2025) Communication challenges and blockchain in building energy efficiency retrofits: Croatia case. Engineering, Construction and Architectural Management, 32(1), pp. 1-15. ISSN 0969-9988

Cevallos, O A; Jaramillo, D; Ávila, C and Aldaz, X (2017) Production and quality levels of construction materials in Andean regions: A case study of Chimborazo, Ecuador. Journal of Construction in Developing Countries, 22(1), pp. 115-136. ISSN 1823-6499

Cevikbas, M; Okudan, O and Işık, Z (2024) Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering, Construction and Architectural Management, 31(1), pp. 1-27. ISSN 0969-9988

Cha, H S (2003) Selecting value management processes for implementation on capital facility projects. PhD thesis, University of Texas at Austin, USA.

Chalhoub, J (2019) Benefits of using augmented reality in planning, construction and post-construction phases in specialty contracting. PhD thesis, Arizona State University, USA.

Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364

Chan, A P C and Oppong, G D (2017) Managing the expectations of external stakeholders in construction projects. Engineering, Construction and Architectural Management, 24(5), pp. 736-756. ISSN 0969-9988

Chan, A P C; Scott, D and Chan, A P L (2004) Factors affecting the success of a construction project. Journal of Construction Engineering and Management, 130(1), pp. 153-155. ISSN 0733-9364

Chan, A T S and Chan, E H W (2005) Impact of perceived leadership styles on work outcomes: Case of building professionals. Journal of Construction Engineering and Management, 131(4), pp. 413-422. ISSN 0733-9364

Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.

Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193

Chan, D W M; Olawumi, T O and Ho, A M L (2019) Critical success factors for building information modelling (BIM) implementation in Hong Kong. Engineering, Construction and Architectural Management, 26(9), pp. 1838-1854. ISSN 0969-9988

Chan, P L (2004) Critical success factors for delivering healthcare projects in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, P W; Fishman, T; Gruis, V; Hu, M; Schruijer, S; van Marrewijk, A and Vrijhoef, R (2023) Questioning collaboration in the circular built environment: Multi-cycle, multi-scalar and multi-level perspectives in the renovation sector. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Chan, S L and Park, M (2005) Project cost estimation using principal component regression. Construction Management and Economics, 23(3), pp. 295-304. ISSN 01446193

Chan, T S A (2005) The impact of subordinates' professionalism on leadership effectiveness in the construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, W T; Chen, C; Messner, J I and Chua, D K H (2005) Interface management for China's build-operate-transfer projects. Journal of Construction Engineering and Management, 131(6), pp. 645-655. ISSN 0733-9364

Chang, C Y and Ko, J W (2017) New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks. Journal of Construction Engineering and Management, 143(1): 06016006, ISSN 0733-9364

Chang, C Y and Qian, Y (2015) An econometric analysis of holdup problems in construction projects. Journal of Construction Engineering and Management, 141(6): 04015004, ISSN 0733-9364

Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy. PhD thesis, Columbia University, USA.

Chang, H-P (2010) Relationships among supply chain management, strategic alliances, and organizational performance with implications for the construction industry. PhD thesis, Lynn University, USA.

Chang, J; Jaskula, K; Papadonikolaki, E; Rovas, D and Parlikad, A K (2024) Can blockchain prevent the deterioration of building handover information quality for higher education institutions? Built Environment Project and Asset Management, 14(4), pp. 509-528. ISSN 2044-124X

Chang, K (2004) Multiattribute weighting models for best-value selection in public sector design-build projects. PhD thesis, University of Colorado at Boulder, USA.

Chang, R and Antwi-Afari, M F (2025) Critical success factors for implementing 3D printing technology in construction projects: Academics and construction practitioners' perspectives. Construction Innovation, 25(3), pp. 843-866. ISSN 1471-4175

Chang, T; Chi, S and Im, S B (2022) Understanding user experience and satisfaction with urban infrastructure through text mining of civil complaint data. Journal of Construction Engineering and Management, 148(8): 04022061, ISSN 0733-9364

Chao, C-H (2001) Formulation of an e -business inter-enterprise collaboration for the construction industry. PhD thesis, Northwestern University, USA.

Charef, R (2019) A BIM-based framework to integrate a sustainable end-of-life into the asset lifecycle: towards the circular economy. PhD thesis, Coventry University, UK.

Charkhakan, M H and Heravi, G (2018) Risk manageability assessment to improve risk response plan: Case study of construction projects in Iran. Journal of Construction Engineering and Management, 144(11): 05018012, ISSN 0733-9364

Charles, Robert Douglas (2025) An investigation into the performance and implementation of the early contractor involvement procurement model within the Australian infrastructure sector. PhD thesis, Queensland University of Technology, Australia.

Charles, S H; Chang-Richards, A and Yiu, T W (2022) What do post-disaster reconstruction project success indicators look like? End-user's perspectives. International Journal of Disaster Resilience in the Built Environment, 13(1), pp. 31-50. ISSN 1759-5916

Charles, S H; Chang-Richards, A and Yiu, T W (2023) Providing a framework for post-disaster resilience factors in buildings and infrastructure from end-users' perspectives: Case study in caribbean island states. International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 366-386. ISSN 1759-5916

Charles, S P R; Wanigarathna, N and Sherratt, F (2015) Construction project change: Investigating cost and benefits. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Charoenngam, C; Coquinco, S T and Hadikusumo, B H W (2003) Web-based application for managing change orders in construction projects. Construction Innovation, 3(4), pp. 197-215. ISSN 1471-4175

Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction. PhD thesis, George Washington University, USA.

Charousaei, M; Faizi, M and Khakzand, M (2025) The impact of the visual layout of university open space on students' behavior and satisfaction level: The case of Iran University of Science and Technology. Smart and Sustainable Built Environment, 14(4), pp. 992-1016. ISSN 2046-6099

Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364

Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2013) Development of a conceptual team integration performance index for alliance projects. Construction Management and Economics, 31(11), pp. 1128-1143. ISSN 1466433X

Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2015) A fuzzy approach to developing scales for performance levels of alliance team integration assessment. Journal of Construction Engineering and Management, 141(5): 04014094, ISSN 0733-9364

Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2017) Validation of a team integration assessment tool in road infrastructure alliance projects. International Journal of Construction Management, 17(2), pp. 151-164. ISSN 1562-3599

Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2018) Making sense of team integration practice through the "lived experience" of alliance project teams. Engineering, Construction and Architectural Management, 25(5), pp. 598-622. ISSN 0969-9988

Che Ibrahim, C K I; Manu, P; Belayutham, S; Cheung, C; Mohamad, M Z and Yunusa-Kaltungo, A (2022) Design for safety organisational capability in Malaysia: A multi-stakeholder perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Che Ibrahim, C K I; Mohamad Sabri, N A; Belayutham, S and Mahamadu, A (2019) Exploring behavioural factors for information sharing in BIM projects in the Malaysian construction industry. Built Environment Project and Asset Management, 9(1), pp. 15-28. ISSN 2044-124X

Cheetham, D W (1997) The search for quality: Improving the audit. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Chelson, D E (2010) The effects of building information modeling on construction site productivity. PhD thesis, University of Maryland, College Park, USA.

Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.

Chen, G (2023) Enhance collaboration reliability at task level for construction projects using blockchain technology. PhD thesis, North Carolina State University, USA.

Chen, G; Chen, J; Tang, Y; Ning, Y and Li, Q (2022) Collaboration strategy selection in BIM-enabled construction projects: A perspective through typical collaboration profiles. Engineering, Construction and Architectural Management, 29(7), pp. 2689-2713. ISSN 0969-9988

Chen, H and Chan, I Y S (2024) Effects of automation and transparency on human psychophysiological states and perceived system performance in construction safety automation: An electroencephalography experiment. Journal of Construction Engineering and Management, 150(7): 04024055, ISSN 0733-9364

Chen, H; Lei, Y; Wu, X and Liu, Y (2025) Evaluation of fuzzy uncertainty risk identification for waste-to-energy public-private partnership projects on the basis of the cloud model and fuzzy cognitive map. Journal of Construction Engineering and Management, 151(12): 04025191, ISSN 0733-9364

Chen, Kaiwen (2020) Analysis and management of UAV-captured images towards automation of building facade inspections. PhD thesis, Virginia Tech, USA.

Chen, L and Manley, K (2014) Validation of an instrument to measure governance and performance on collaborative infrastructure projects. Journal of Construction Engineering and Management, 140(5): 04014006, ISSN 0733-9364

Chen, L; Manley, K; Lewis, J; Helfer, F and Widen, K (2018) Procurement and governance choices for collaborative infrastructure projects. Journal of Construction Engineering and Management, 144(8): 04018071, ISSN 0733-9364

Chen, P (2005) An interpretive comparison of Chinese and western conceptions of project management work. PhD thesis, Cranfield University, UK.

Chen, P; Qiang, M and Wang, J N (2009) Project management in the Chinese construction industry: Six-case study. Journal of Construction Engineering and Management, 135(10), pp. 1016-1026. ISSN 0733-9364

Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.

Chen, W; Yang, Z; Yan, H and Zhao, Y (2025) How to reduce construction risks in rural areas: an evolutionary game analysis. Engineering, Construction and Architectural Management, 32(7), pp. 4495-4521. ISSN 0969-9988

Chen, Wenxin (2022) Establishing balance in project governance: Exploring yin-yang and mindfulness. PhD thesis, University of New South Wales, Australia.

Chen, X (2019) Big data in construction project management: prospects and challenges. PhD thesis, University of Hong Kong, Hong Kong.

Chen, X B and Kim, T W (2017) Automated mapping of user activities onto flexible space in space-use analysis. Journal of Construction Engineering and Management, 143(8): 04017034, ISSN 0733-9364

Chen, Y; Wang, W; Zhang, S and You, J (2018) Understanding the multiple functions of construction contracts: The anatomy of FIDIC model contracts. Construction Management and Economics, 36(8), pp. 472-485. ISSN 01446193

Chen, Y E; Ahiaga-Dagbui, D; Thaheem, M and Shrestha, A (2022) Optimism bias in transport project cost appraisal: A review of the current body of knowledge. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Chen, Y Q; Lu, H; Lu, W and Zhang, N (2010) Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA). Engineering, Construction and Architectural Management, 17(6), pp. 598-614. ISSN 0969-9988

Chen, Z (2003) An integrated analytical approach to environmental management in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chen, Z; li, H; Kong, S C W and xu, Q (2005) A knowledge-driven management approach to environmental-conscious construction. Construction Innovation, 5(1), pp. 27-39. ISSN 1471-4175

Chenchu, M. K.; Ruikar, K. and Jha, K. N. (2026) Strategic social network analysis for overcoming knowledge management challenges in construction: An in-depth review. Engineering, Construction and Architectural Management, 33(7), pp. 5495-5521. ISSN 0969-9988

Cheng, M Y; Vu, Q T and Wu, T C (2026) Highway bridge crack inspection verification and training using an automated augmented reality system. Journal of Construction Engineering and Management, 152(3): 04025279, ISSN 0733-9364

Cheng, Y H and Hong, W T (2025) An analytical research tool for monitoring stakeholder conflicts in public-private partnership project delivery. Construction Management and Economics, 43(12), pp. 1060-1079. ISSN 0144-6193

Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework. PhD thesis, University of Wolverhampton, UK.

Cheng, J and Proverbs, D G (2004) The impact of strategic decisions on construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Cheng, J; Proverbs, D G; Oduoza, C and Fleming, C (2005) A conceptual model towards the measurement of construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Cheng, J; Proverbs, D G and Oduoza, C F (2006) The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(6), pp. 567-583. ISSN 0969-9988

Cheng, J C P and Venkataraman, V (2016) Analyzing relationships between project team compositions and green building certification in green building projects. Built Environment Project and Asset Management, 6(5), pp. 449-461. ISSN 2044-124X

Cheng, M Y; Su, C W and You, H Y (2003) Optimal project organizational structure for construction management. Journal of Construction Engineering and Management, 129(1), pp. 70-79. ISSN 0733-9364

Cheng, Y M; Yu, C H and Wang, H T (2011) Short-interval dynamic forecasting for actual S-curve in the construction phase. Journal of Construction Engineering and Management, 137(11), pp. 933-941. ISSN 0733-9364

Chennarapu, H; Garala, T K; Chennareddy, R; Balunaini, U and Venkata Narasimha Reddy, G (2018) Compaction quality control of earth fills using dynamic cone penetrometer. Journal of Construction Engineering and Management, 144(9): 04018086, ISSN 0733-9364

Cherns, A B and Bryant, D T (1984) Studying the client's role in construction management. Construction Management and Economics, 2(2), pp. 177-184. ISSN 01446193

Chesworth, B (2015) Is the concept of zero harm an achievable goal? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Cheung, C K (2005) CH2 energy harvesting systems: Economic use and efficiency. Construction Economics and Building, 5(2), pp. 20-31. ISSN 2204-9029

Cheung, S O; Tam, C M; Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(3), pp. 281-294. ISSN 01446193

Cheung, S O and Tsang, K F (1997) Professional liabilities in construction: Exposures and responses. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cheung, S O; Yiu, T W and Chan, H W (2010) Exploring the potential for predicting project dispute resolution satisfaction using logistic regression. Journal of Construction Engineering and Management, 136(5), pp. 508-517. ISSN 0733-9364

Cheung, S O; Yiu, T W; Leung, A Y T and Chiu, O K (2008) Catastrophic transitions of construction contracting behavior. Journal of Construction Engineering and Management, 134(12), pp. 942-952. ISSN 0733-9364

Cheung, S-O (1997) Risk allocation: an essential tool for construction project management. Journal of Construction Procurement, 3(1), pp. 16-27. ISSN 1358-9180

Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.

Cheung, S-O; Lam, K-C; Wong, S-S and Wong, S-H (2001) The fee sensitive risk exposures of project authorized person in Hong Kong. Construction Economics and Building, 1(2), pp. 65-72. ISSN 2204-9029

Chew, M Y L; Conejos, S and Azril, F H B (2019) Design for maintainability of high-rise vertical green facades. Building Research & Information, 47(4), pp. 453-467. ISSN 0961-3218

Chew, M Y L and De Silva, N (2004) Factorial method for performance assessment of building facades. Journal of Construction Engineering and Management, 130(4), pp. 525-533. ISSN 0733-9364

Chi, C S-F (2010) How host country and transnational institutions interact on international infrastructure projects in less developed countries: Case studies of high-speed rail projects in China and Taiwan. PhD thesis, Stanford University, USA.

Chi, Sae (2018) Developing a methodology for evaluating privately operated toll road projects using stochastic cost-benefit analysis. PhD thesis, Queensland University of Technology, Australia.

Chiang, Lee-Yun (2023) Affordable housing as an infrastructure asset: A public-private partnerships approach. PhD thesis, Griffith University, Australia.

Chiang, Y H; Li, V J; Zhou, L; Wong, F and Lam, P (2016) Evaluating sustainable building-maintenance projects: Balancing economic, social, and environmental impacts in the case of Hong Kong. Journal of Construction Engineering and Management, 142(2): 06015003, ISSN 0733-9364

Chidiobi, C (2022) Development of frameworks for the management of materials procurement and construction waste for Nigerian contractors. PhD thesis, University of the West of England, Bristol, UK.

Chih, Y-Y (2010) A decision-support framework for choosing a project delivery system in a multi-project environment. PhD thesis, University of California, Berkeley, USA.

Chih, Ying-Yi (2010) A decision-support framework for choosing a project delivery system (PDS) in a multi-project environment. PhD thesis, University of California, USA.

Chileshe, N; Boadua, A and Yirenkyi, F (2011) Perceptions of threat risk frequency and impact on construction projects in Ghana: Opinion survey findings. Journal of Construction in Developing Countries, 16(2), pp. 115-149. ISSN 1823-6499

Chileshe, N and Boadua Yirenkyi-Fianko, A (2012) An evaluation of risk factors impacting construction projects in Ghana. Journal of Engineering, Design and Technology, 10(3), pp. 306-329. ISSN 1726-0531

Chileshe, N and Haupt, T C (2007) Age influences on the job satisfaction of construction workers: Evidence from South Africa. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Chileshe, N and Haupt, T C (2010) The effect of age on the job satisfaction of construction workers. Journal of Engineering, Design and Technology, 8(1), pp. 107-118. ISSN 1726-0531

Chileshe, N and Sim, Y L (2007) Desirable management practices and cultural values for construction quality assessment systems (CONQUAS): Methodology for deployment. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Chin, C S and Russell, J S (2008) Predicting the expected service level and the realistic lead time of rfi process using binary logistic regression. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.

Chin, K S and Choi, T W (2003) Construction in Hong Kong: Success factors for iso9000 implementation. Journal of Construction Engineering and Management, 129(6), pp. 599-609. ISSN 0733-9364

Chinda, T and Mohamed, S (2008) Structural equation model of construction safety culture. Engineering, Construction and Architectural Management, 15(2), pp. 114-131. ISSN 0969-9988

Chinowsky, P S; Diekmann, J and O'Brien, J (2010) Project organizations as social networks. Journal of Construction Engineering and Management, 136(4), pp. 452-458. ISSN 0733-9364

Chinyio, E (1999) An evaluation of construction clients' needs and preferences. PhD thesis, University of Wolverhampton, UK.

Chinyio, E; Suresh, S and Salisu, J B (2018) The impacts of monetary rewards on public sector employees in construction: A case of Jigawa State in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 125-142.

Chiponde, D; Gledson, B and Greenwood, D (2024) The institutional field of learning from project-related failures: opportunities and challenges. Construction Economics and Building, 24(1-2), pp. 163-181. ISSN 2204-9029

Cho, J G (2008) Open source project managment: From the integrated control perspective. PhD thesis, Claremont Graduate University, USA.

Cho, N (2020) Using industry data to make an impact on construction practices over the project lifecycle. PhD thesis, Arizona State University, USA.

Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.

Cho, Y; Wang, C and Zhuang, Z (2013) Framework for empirical process to improve nonnuclear gauge performance in hot-mix asphalt pavement construction. Journal of Construction Engineering and Management, 139(6), pp. 601-610. ISSN 0733-9364

Chohan, A H; Che-Ani, A I; Bhai Khan, S; Awad, J; Jawaid, A and Mohd Tawil, N (2015) A model of housing quality determinants for affordable housing. Journal of Construction in Developing Countries, 20(1), pp. 117-136. ISSN 1823-6499

Chong, H Y; Zhang, Y; Lee, C Y; Wang, F and Zhang, Y (2025) Synchronizing BIM cost models and bills of quantities for lifecycle audit trail cost management. Engineering, Construction and Architectural Management, 32(10), pp. 6566-6592. ISSN 0969-9988

Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.

Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364

Choudhry, R M; Hinze, J W; Arshad, M and Gabriel, H F (2012) Subcontracting practices in the construction industry of Pakistan. Journal of Construction Engineering and Management, 138(12), pp. 1353-1359. ISSN 0733-9364

Choudhury, N-U-S (1989) An evaluation of factors to improve performance of American engineering and construction managers overseas. PhD thesis, Texas A&M University, USA.

Chow, V W and Leiringer, R (2014) The translation of power: A study of boundary objects in public engagement processes. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Christensen, A N (2019) Identifying private construction project owner inefficiencies that affect project goals. PhD thesis, Iowa State University, USA.

Christian, J (2002) An overview of systems utilizing information and communication technologies: Five research case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Christiansen, T R (1994) Modeling efficiency and effectiveness of coordination in engineering design teams. PhD thesis, Stanford University, USA.

Chu, L (2017) Incorporation of functional considerations in highway pavement design and operations. PhD thesis, National University of Singapore, Singapore.

Chua, D K H; Kog, Y C and Loh, P K (1999) Critical success factors for different project objectives. Journal of Construction Engineering and Management, 125(3), pp. 142-150. ISSN 0733-9364

Chua, D K H; Kog, Y C; Loh, P K and Jaselskis, E J (1997) Model for construction budget performance: neural network approach. Journal of Construction Engineering and Management, 123(3), pp. 214-222. ISSN 0733-9364

Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364

Chui, K W (2010) Comparison of construction labor productivity between U.S. and China: Using on-site productivity measurement methods. PhD thesis, University of Kansas, USA.

Chunduri, S (2014) Development of planning and design phases of an integrative building lifecycle process model for advanced energy retrofit projects. PhD thesis, Pennsylvania State University, USA.

Chung, J H (2015) Optimizing financial structure of transportation public-private partnership infrastructure projects based on traffic revenue risks: Case study of US DBFOM project. PhD thesis, University of Florida, USA.

Chung, K-H J (2010) Development of a collaborative briefing approach for infrastructure projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Cicmil, S and Marshall, D (2005) Insights into collaboration at the project level: Complexity, social interaction and procurement mechanisms. Building Research & Information, 33(6), pp. 523-535. ISSN 0961-3218

Clarke, J L (2013) Sustainable buildings: sustainable behaviour? To what extent do sustainable buildings encourage sustainable behaviour through their design, construction, operation and use? PhD thesis, Kingston University, UK.

Cleary, J (2024) Data driven insights into building project performance and outcomes through advanced data analytics. PhD thesis, Arizona State University, USA.

Clement, D; Aliabadi, A A; MacKey, J; Thé, J and Gharabaghi, B (2021) Dust emissions management model for construction sites. Journal of Construction Engineering and Management, 147(8): 04021092, ISSN 0733-9364

Cleveland, T G and Fashokun, A (2006) Construction-associated solids loads with a temporary sediment control bmp. Journal of Construction Engineering and Management, 132(10), pp. 1122-1125. ISSN 0733-9364

Close R, L M (2013) Community consultation during construction: Attitudes, experiences and skills. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Cockerill, J E (1993) The construction industry in belfast 1800-1914. PhD thesis, Queen's University Belfast, UK.

Codarin, Sara (2020) Innovative construction systems within building processes: An approach to large-scale robotic additive layer manufacturing for the conservation of cultural heritage. PhD thesis, University of Ferrara, Italy.

Col Debella, D and Ries, R (2006) Construction delivery systems: A comparative analysis of their performance within school districts. Journal of Construction Engineering and Management, 132(11), pp. 1131-1138. ISSN 0733-9364

Cole, B K (2012) Building social infrastructure through public-private partnerships: The case of student housing in public higher education. PhD thesis, Clemson University, USA.

Collins, Wesley A (2015) Development of the project definition rating index (PDRI) for small industrial projects. PhD thesis, Arizona State University, USA.

Comassetto Hamerski, D; Saurin, T A; Formoso, C T and Isatto, E L (2024) The Last Planner system as an emergent production planning and control method: The role of multiple representations. Journal of Construction Engineering and Management, 150(11): 04024155, ISSN 0733-9364

Commuri, S; Mai, A T and Zaman, M (2011) Neural network-based intelligent compaction analyzer for estimating compaction quality of hot asphalt mixes. Journal of Construction Engineering and Management, 137(9), pp. 634-644. ISSN 0733-9364

Conejos, S; Chew, M Y L; Tay, K; Tay, S and Safiena, S (2023) Green maintainability assessment of building-integrated photovoltaic (BIPV) applications: Lessons learnt. International Journal of Building Pathology and Adaptation, 41(2), pp. 320-346. ISSN 23984708

Conejos, S; Ubando, A and Lin Chew, M Y (2022) Design for maintainability tool for nano-façade coating applications on high-rise façades in the tropics. Built Environment Project and Asset Management, 12(1), pp. 70-95. ISSN 2044-124X

Conzatti, A; Fosas De Pando, D; Chater, B and Coley, D (2025) Are simple models for natural ventilation suitable for shelter design? Buildings & Cities, 6(1), pp. 158-181. ISSN 2632-6655

Cook, E L (1997) Integration of total quality management with a project management approach for capital projects. PhD thesis, Texas A&M University, USA.

Cooper, J; Lee, A and Jones, K (2020) Sustainable built asset management performance indicators and attributes: A UK social housing case study example. International Journal of Building Pathology and Adaptation, 38(3), pp. 508-522. ISSN 23984708

Cooper, L P (2008) How project teams conceive of and manage pre-quantitative risk. PhD thesis, University of Southern California, USA.

Coopman, J T (1998) Superintendent motivation and satisfaction related to the use of construction management for school facility projects. EdD thesis, Ball State University, USA.

Corbett, D I (1997) Quantifying quality in industrial construction. PhD thesis, Pennsylvania State University, USA.

Costa, A C B (2014) The effects of organizational justice and exercise on the relationship between job stressors and employee health. PhD thesis, Portland State University, USA.

Cottrell, D S (1995) Enhancing construction productivity through continuous process improvements. PhD thesis, Texas A&M University, USA.

Cottrell, D S (2006) Contractor process improvement for enhancing construction productivity. Journal of Construction Engineering and Management, 132(2), pp. 189-196. ISSN 0733-9364

Coutts, A W (1997) Change management in the construction industry: a client's mechanism for control. PhD thesis, Heriot-Watt University, UK.

Cox, R F; Issa, R R A and Ahrens, D (2003) Management's perception of key performance indicators for construction. Journal of Construction Engineering and Management, 129(2), pp. 142-151. ISSN 0733-9364

Craighill, A L (2002) Lifecycle assessment and evaluation of construction and demolition waste management. PhD thesis, University of East Anglia, UK.

Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.

Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.

Creedy, G D; Skitmore, M and Wong, J K W (2010) Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), pp. 528-537. ISSN 0733-9364

Cripps, A (2004) Cardboard as a construction material: A case study. Building Research & Information, 32(3), pp. 207-219. ISSN 0961-3218

Crolla, Kristof (2018) Building simplexity: The 'more or less' of post-digital architecture practice. PhD thesis, RMIT University, Australia.

Crompton, L (2016) A standardised incorporated partnering model for the UK construction industry. PhD thesis, University of Central Lancashire, UK.

Cruz-Roveda, S (2022) A qualitative open-ended interview study using a comparative multiple case study approach of bus rapid transit (BRT) construction projects within the United States. DPA thesis, California Baptist University, USA.

Cui, Q; Davis, J S and Huang, H (2016) How happy are project managers in their jobs. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Curlee, W (2002) Modern virtual project management: The effects of a centralized and decentralized project management office. DM thesis, University of Phoenix, USA.

Curwell, S; Yates, A; Howard, N; Bordass, B and Doggart, J (1999) The green building challenge in the UK. Building Research & Information, 27(4-5), pp. 286-293. ISSN 0961-3218

Cusack, M M (1981) Time cost models: their use in decision making in the construction industry, with particular reference to the use of the microcomputer. PhD thesis, University of Bath, UK.

Cushman, N S; Nam, C H and Tatum, C B (1992) Technology transfer in building construction: case of seismic design. Journal of Construction Engineering and Management, 118(1), pp. 129-141. ISSN 0733-9364

Cusumano, L; Farmakis, O; Granath, M; Olsson, N; Jockwer, R and Rempling, R (2025) Current benefits and future possibilities with digital field reporting. International Journal of Construction Management, 25(5), pp. 572-583. ISSN 1562-3599

Czarnocki, V and Murray, M (2004) The new scottish parliament project: A content analysis of two broadsheet newspapers. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Da Rocha, C G and Kemmer, S L (2013) Method to implement delayed product differentiation in construction of high-rise apartment building projects. Journal of Construction Engineering and Management, 139(10): 05013001, ISSN 0733-9364

Dabke, S; Salem, O; Genaidy, A and Daraiseh, N (2008) Job satisfaction of women in construction trades. Journal of Construction Engineering and Management, 134(3), pp. 205-216. ISSN 0733-9364

Dabous, S A and Alkass, S (2010) A multi-attribute ranking method for bridge management. Engineering, Construction and Architectural Management, 17(3), pp. 282-291. ISSN 0969-9988

Dada, J O and Jagboro, G O (2007) An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(1), pp. 37-44. ISSN 1366-4387

Dada, M O (2012) Predictors of procurement selection: An investigation of traditional and integrated methods in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 71-85. ISSN 1823-6499

Dada, M O (2014) The influence of project team relationships on cost growth. Journal of Financial Management of Property and Construction, 19(1), pp. 76-94. ISSN 1366-4387

Daddow, T and Skitmore, M (2004) Value management in practice: An interview survey. Construction Economics and Building, 4(2), pp. 11-18. ISSN 2204-9029

Dahalan, N H; Rahman, R A; Ahmad, S W and Che Ibrahim, C K I (2025) Public monitoring of environmental management plan implementation in road construction projects: Key performance indicators. Journal of Engineering, Design and Technology, 23(3), pp. 766-791. ISSN 1726-0531

Dahalan, N H; Rahman, R A; Hassan, S H and Ahmad, S W (2024) Public assessment for environmental management plan implementation: Comparative study of performance indicators of road and highway construction projects. Journal of Construction Engineering and Management, 150(7): 05024006, ISSN 0733-9364

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Dai, F and Lu, M (2013) Three-dimensional modeling of site elements by analytically processing image data contained in site photos. Journal of Construction Engineering and Management, 139(7), pp. 881-894. ISSN 0733-9364

Dai, F; Rashidi, A; Brilakis, I and Vela, P (2013) Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure. Journal of Construction Engineering and Management, 139(1), pp. 69-79. ISSN 0733-9364

Dainty, A R J; Briscoe, G H and Millett, S J (2001) Subcontractor perspectives on supply chain alliances. Construction Management and Economics, 19(8), pp. 841-848. ISSN 01446193

Dainty, A R J; Cheng, M I and Moore, D R (2003) Redefining performance measures for construction project managers: An empirical evaluation. Construction Management and Economics, 21(2), pp. 209-218. ISSN 01446193

Dainty, A R J; Harty, T E and Neale, R H (2000) Improving employee resourcing within large construction organizations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Dainty, A R J and Moore, D R (2000) The performance of integrated D&B project teams in unexpected change event management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Dal Borgo, Eleonora (2017) Sustainable production planning optimisation for project-based enterprises. PhD thesis, Università degli Studi di Udine, Italy.

Dalton, M (2008) A risk breakdown structure for public sector construction projects. PhD thesis, University of Manchester, UK.

Damci, A; Arditi, D and Polat, G (2017) Civil engineers' personal values/demographics linkage in project team building. Engineering, Construction and Architectural Management, 24(6), pp. 1337-1349. ISSN 0969-9988

Damoah, I S (2015) An investigation into the causes and effects of project failure in government projects in developing countries: Ghana as a case study. PhD thesis, Liverpool John Moores University, UK.

Damoah, I S; Ayakwah, A; Aryee, K J and Twum, P (2020) The rise of PPPs in public sector affordable housing project delivery in Ghana: Challenges and policy direction. International Journal of Construction Management, 20(6), pp. 690-703. ISSN 1562-3599

Dandan, T H; Sweis, G; Sukkari, L S and Sweis, R J (2020) Factors affecting the accuracy of cost estimate during various design stages. Journal of Engineering, Design and Technology, 18(4), pp. 787-819. ISSN 1726-0531

Dang, C N and Le-Hoai, L (2016) Critical success factors for implementation process of design-build projects in Vietnam. Journal of Engineering, Design and Technology, 14(1), pp. 17-32.

Dang, M E (2020) An investigation into the policies and initiatives for work-life balance within selected construction companies in Nigeria. PhD thesis, University of Northumbria at Newcastle, UK.

Daniel, E I; Pasquire, C and Dickens, G (2014) Social perspective of planning in construction: The UK experience. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Daniel, E I; Pasquire, C; Dickens, G and Ballard, H G (2017) The relationship between the last planner® system and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(3), pp. 407-425. ISSN 0969-9988

Dansoh, A; Frimpong, S and Oppong, G D (2020) Exploring the dimensions of traditional authority influencing stakeholder management at the pre-construction stage of infrastructure projects. Construction Management and Economics, 38(2), pp. 189-206. ISSN 01446193

Dao, B P (2016) Exploring and measuring project complexity. PhD thesis, Texas A&M University, USA.

Daoud, A O; KhairEldin, M; Ibrahim, A H and Toma, H M (2026) Adaptive neuro-fuzzy inference system for Egyptian residential construction waste prediction. International Journal of Construction Management, 26(6), pp. 1059-1077. ISSN 1562-3599

DarConte, F X (2017) Best value alignment process for public works construction in New York state. PhD thesis, Polytechnic Institute of New York University, USA.

Das, M (2015) Social BIMCloud: a distributed cloud-based BIM framework for object-based lifecycle information exchange and supply chain integration. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Datta, A; Ninan, J and Sankaran, S (2020) 4D visualization to bridge the knowing-doing gap in megaprojects: An Australian case study. Construction Economics and Building, 20(4), pp. 25-41. ISSN 2204-9029

Dave, B A (2013) Developing a construction management system based on lean construction and building information modelling. PhD thesis, University of Salford, UK.

Davenport, D M (1998) A comparative study of the effectiveness of the UK and French construction industries in the achievement of satisfaction with performance as perceived by the construction client. PhD thesis, University of Central Lancashire, UK.

Davenport, D M and Smith, R (1995) International procurement systems: Assessment of required levels of client participation in construction projects. Journal of Construction Procurement, 1(1), pp. 38-49. ISSN 1358-9180

Davey, C L; McDonald, J; Lowe, D; Duff, R; Powell, J A and Powell, J E (2006) Defects liability management by design. Building Research & Information, 34(2), pp. 145-153. ISSN 0961-3218

Davies, K; McMeel, D J and Wilkinson, S (2017) Making friends with Frankenstein: Hybrid practice in BIM. Engineering, Construction and Architectural Management, 24(1), pp. 78-93. ISSN 0969-9988

Davies, P J (2015) Assessing initial embodied energy in UK non-domestic construction projects. EngD thesis, Loughborough University, UK.

Davies, P J; Emmitt, S and Firth, S K (2014) Challenges for capturing and assessing initial embodied energy: A contractor's perspective. Construction Management and Economics, 32(3), pp. 290-308. ISSN 01446193

Davies, R (2013) Healthcare built environment impacts, construction projects and organisational change. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Davila Delgado, J M; Oyedele, L; Beach, T and Demian, P (2020) Augmented and virtual reality in construction: Drivers and limitations for industry adoption. Journal of Construction Engineering and Management, 146(7): 04020079, ISSN 0733-9364

Davis, C (2020) The influence of national culture on conflict in project management: How organizations manage conflict. PhD thesis, Northcentral University, USA.

Davis, K; Ledbetter, W B and Burati, J L (1989) Measuring design and construction quality costs. Journal of Construction Engineering and Management, 115(3), pp. 385-400. ISSN 0733-9364

Davis, P and Love, P (2011) Alliance contracting: Adding value through relationship development. Engineering, Construction and Architectural Management, 18(5), pp. 444-461. ISSN 0969-9988

Davis, P R (2004) Relationship marketing techniques in construction projects: A case study approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Davis, Peter Rex (2005) Application of relationship marketing to construction. PhD thesis, RMIT University, Australia.

Davis, S; Davis, T; Howell, D and Leitzke, D (2020) Building engineers and construction managers: The impact of international service projects on the development of undergraduate students. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(2), pp. 210-230. ISSN 0969-9988

Dawood, N and Sikka, S (2007) Measuring the effectiveness of 4D planning as a valuable communication tool. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988

Dawood, N; Sikka, S; Marasini, R and Dean, J (2006) Development of key performance indicators to establish the benefits of 4D planning. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193

Dawood, N N (1995) An integrated bidding management expert system for the make-to-order precast industry. Construction Management and Economics, 13(2), pp. 115-125. ISSN 01446193

Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: An application to the pre-cast industry. Construction Management and Economics, 13(1), pp. 53-64. ISSN 01446193

Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Dawood, N N; Hobbs, B and Fanning, A (2001) Standardization of brickwork construction: Identification and measurement of standard processes. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Dawood, N N and Neale, R H (1990) A survey of current production planning practices in the precast concrete industry. Construction Management and Economics, 8(4), pp. 365-383. ISSN 01446193

Day, K (2024) Emulating the past, envisioning the future: A study of CAD file preservation in Australian architectural practices. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

De Athayde Prata, B; Pitombeira-Neto, A R and De Moraes Sales, C J (2015) An integer linear programming model for the multiperiod production planning of precast concrete beams. Journal of Construction Engineering and Management, 141(10): 04015029, ISSN 0733-9364

De Filippi, Giancarlo Azevedo (2017) Method for production planning and management of time in real estate projects. PhD thesis, Universidade de São Paulo, Brazil.

De Marco, A; Rafele, C and Thaheem, M J (2016) Dynamic management of risk contingency in complex design-build projects. Journal of Construction Engineering and Management, 142(2): 04015080, ISSN 0733-9364

De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Debrah, C and Owusu-Manu, D G (2022) An apposite framework for green cities development in developing countries: The case of Ghana. Construction Innovation, 22(4), pp. 789-808. ISSN 1471-4175

Debs, L and Hubbard, B (2023) Gathering and disseminating lessons learned in construction companies to support knowledge management. Construction Economics and Building, 23(1-2), pp. 56-76. ISSN 2204-9029

Deep, A; Nayyer, M I and Annamalai, T R (2025) When sauce for the goose is not sauce for the gander—the divergent impact of transparency law in infrastructure procurement: Evidence from EPC and PPP road projects in India. Construction Management and Economics, 43(11), pp. 922-937. ISSN 0144-6193

Deep, S (2021) Influence of ‘power’ and ‘dependence’ attributes on main contractor and sub-contractor collaboration in construction projects. PhD thesis, University of Newcastle, Australia.

Deep, S; Bhoola, V; Vidhani, J and Hampannaver, P R (2022) Evaluating the impact of constraints on project success: Empirical study of highway projects. Built Environment Project and Asset Management, 12(4), pp. 684-700. ISSN 2044-124X

Deep, S; Joshi, R and Patil, S (2023) Identifying the contractor's core competencies in post-COVID-19 scenario: Developing a survey instrument. Engineering, Construction and Architectural Management, 30(9), pp. 3781-3797. ISSN 0969-9988

Deepak, D and Mahesh, G (2023) A framework for enhancing construction safety through knowledge-based safety culture indicators. International Journal of Construction Management, 23(12), pp. 2039-2047. ISSN 1562-3599

Dejahang, F (2004) Determinants of productivity on construction sites. PhD thesis, London South Bank University, UK.

Del Ceno, J S (2012) Selective licensing and resident satisfaction in social housing: A UK case study. International Journal of Law in the Built Environment, 4(2), pp. 126-139. ISSN 1756-1450

Del Solar, P; Del Río, M; Villoria, P and Nadal, A (2016) Analysis of recurrent defects in the execution of ceramic-coatings cladding in building construction. Journal of Construction Engineering and Management, 142(4): 04015093, ISSN 0733-9364

Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.

Delatte, G (2014) The effects of three dimensional modeling on labor productivity through enhancing visualization of craft workers in the industrial construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Delatte, N J (2017) Challenges of civil engineering megaprojects in North America. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 161-166. ISSN 17514304

Delgado-Hernandez, D J and Aspinwall, E M (2005) Improvement tools in the UK construction industry. Construction Management and Economics, 23(9), pp. 965-977. ISSN 01446193

Delgado-Hernandez, D J; Cruz-Cruz, C C and Vences-García, P Y (2017) Improvement management tools in the construction industry: Case study of Mexico. Journal of Construction Engineering and Management, 143(4): 05016024, ISSN 0733-9364

Delgado-Hernández, D J (2005) A framework for building quality into construction projects. PhD thesis, University of Birmingham, UK.

Demetracopoulou, V; O'Brien, W J; Khwaja, N; Feghaly, J and El Asmar, M (2024) A critical review and analysis of decision-support processes and tools for project delivery method selection. Engineering, Construction and Architectural Management, 31(1), pp. 487-505. ISSN 0969-9988

Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.

Demian, P and Walters, D (2014) The advantages of information management through building information modelling. Construction Management and Economics, 32(12), pp. 1153-1165. ISSN 01446193

Den Otter, A and Emmitt, S (2007) Exploring effectiveness of team communication: Balancing synchronous and asynchronous communication in design teams. Engineering, Construction and Architectural Management, 14(5), pp. 408-419. ISSN 0969-9988

Deng, F (2015) Performance measurement system: attributes, effects and context in UK construction firms. PhD thesis, University College London, UK.

Denicol, Juliano (2019) Designing client organisations and supply chain strategies to deliver megaprojects. PhD thesis, University College London, UK.

Denny, J (2025) Organizing change: A single case study exploring the perceptions of self-determination in high school employees during a building renovation. EdD thesis, Baylor University, USA.

Derrington, P A (1981) Controlling the quality of professional performance in architectural practice. PhD thesis, University of California, Berkeley, USA.

Deshpande, A S (2009) Best practices for the management of design in fast track industrial projects. PhD thesis, University of Cincinnati, USA.

Deshpande, A S; Salem, O M and Miller, R A (2012) Analysis of the higher-order partial correlation between CII best practices and performance of the design phase in fast-track industrial projects. Journal of Construction Engineering and Management, 138(6), pp. 716-724. ISSN 0733-9364

Dettwiler, P (2006) Facilities management of the offices of growth firms: Phases and locations. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Devine, R D; Barbachyn, S M; Thrall, A P and Kurama, Y C (2018) Effect of tripping prefabricated rebar assemblies on bar spacing. Journal of Construction Engineering and Management, 144(11): 04018099, ISSN 0733-9364

Devkar, G A and Kalidindi, S N (2013) External agencies for supplementing competencies in Indian urban PPP projects. Built Environment Project and Asset Management, 3(1), pp. 58-73. ISSN 2044-124X

Dewlaney, K S and Hallowell, M (2012) Prevention through design and construction safety management strategies for high performance sustainable building construction. Construction Management and Economics, 30(2), pp. 165-177. ISSN 1466433X

Dhaenens, A; Zheng, W; Sanders, K and Sumelius, J (2026) Mind the gap: Employee work arrangements, work-family balance satisfaction, and turnover in international property development. Journal of Construction Engineering and Management, 152(1): 04025231, ISSN 0733-9364

Dhakal, S; Mrawira, D and Rankin, J (2009) Effect of specifications type on the quality of paving contracts in New Brunswick. Journal of Construction Engineering and Management, 135(9), pp. 801-811. ISSN 0733-9364

Dhanasekar, Y and Anandh, K S (2025) Deciphering the role of age and gender in perceiving organizational politics in construction. Built Environment Project and Asset Management, 15(2), pp. 354-370. ISSN 2044-124X

Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.

Dhungel, H (1996) Macroeconomic adjustments to large energy investments in a small controlled open economy: A policy analysis of hydropower development in Paraguay. PhD thesis, University of Pennsylvania, USA.

Dias Jr, A and Ioannou, P G (1996) Company and project evaluation model for privately promoted infrastructure projects. Journal of Construction Engineering and Management, 122(1), pp. 71-82. ISSN 0733-9364

Diaz-Murillo, M (1993) A strategy for the implementation of quality function deployment in the design-construction industry. PhD thesis, Texas A&M University, USA.

Dib, H; Adamo-Villani, N and Issa, R R A (2013) A GIS-based visual information model for buildng construction project management. International Journal of Construction Management, 13(1), pp. 1-18. ISSN 1562-3599

Dib, H Y (2006) Visual information access and management for life cycle project management. PhD thesis, University of Florida, USA.

Dickens, G (2002) Teamworking, perceptions and communication within construction projects. PhD thesis, University of Nottingham, UK.

Dicks, E P (2023) Analysis of risk identification and relationships for major engineering and construction transportation projects. PhD thesis, University of Colorado at Boulder, USA.

Didla, N R (2018) Evaluation of the impact of quality risk management on quality performance in the UAE construction projects. PhD thesis, Heriot-Watt University, UK.

Diekmann, J; Ashley, D; Bauman, R; Carroll, J and Finlayson, F (2000) Viability of privatised transportation projects: An evaluation tool for design/build teams. Journal of Construction Procurement, 6(1), pp. 33-43. ISSN 1358-9180

Diekmann, J E (2007) Past perfect: Historical antecedents of modern construction practices. Journal of Construction Engineering and Management, 133(9), pp. 652-660. ISSN 0733-9364

Diker, F and Erkan, İ (2022) Fuzzy logic method in the design of elementary school classrooms. Architectural Engineering and Design Management, 18(5), pp. 739-758. ISSN 1745-2007

Dikmen, I; Birgonul, M T; Ozorhon, B and Eren, K (2008) Critical success factors for partnering in the Turkish construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Dimitrov, D S (2024) The new work of building operations in the digital age: The impact of IoT and digital twins on facility management and operational practices. PhD thesis, University of Washington, USA.

Ding, G K C (2005) Developing a multicriteria approach for the measurement of sustainable performance. Building Research & Information, 33(1), pp. 3-16. ISSN 0961-3218

Ding, Grace K C (2004) The development of a multi-criteria approach for the measurement of sustainable performance for built projects and facilities. PhD thesis, University of Technology Sydney, Australia.

Ding, Z; Ng, F and Wang, J (2014) Testing trust scale measurement invariance in project teams. Journal of Engineering, Design and Technology, 12(2), pp. 209-222. ISSN 1726-0531

Ding, Z; Ng, F; Wang, J and Zou, L (2012) Distinction between team-based self-esteem and company-based self-esteem in the construction industry. Journal of Construction Engineering and Management, 138(10), pp. 1212-1219. ISSN 0733-9364

Ding, Z; Ng, F F and Wang, J (2013) The mediation role of trust in knowledge sharing a cognitive perspective in Chinese architectural design teams. Engineering, Construction and Architectural Management, 20(6), pp. 604-619. ISSN 0969-9988

Ding, Z; Zuo, J; Wang, J and Zillante, G (2016) Searching for niche market for engineering consultants: Case of regional supervision systems in China. Engineering, Construction and Architectural Management, 23(5), pp. 622-637. ISSN 0969-9988

Dinis, F A M (2023) Development and validation of BIM-based natural user interfaces for non-geometrical information management. PhD thesis, Universidade do Porto, Portugal.

Dithebe, K; Thwala, W D D; Aigbavboa, C O; Edwards, D J; Hayhow, S and Talebi, S (2023) Stakeholder management in the alleviation of legal and regulatory disputes in public-private partnership projects in South Africa. Journal of Engineering, Design and Technology, 21(2), pp. 325-342. ISSN 1726-0531

Dixit, V (2022) Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(8), pp. 1537-1549. ISSN 1562-3599

Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599

Dixon, T J (1994) An analysis of IT skills training and education in the surveying profession. PhD thesis, University of Reading, UK.

Djafri, R; Mohamed Osman, M; Suzilawati Rabe, N and Shuid, S (2020) Investigating quality of life by residents of social housing in eastern Algeria: a structural equation modelling. Journal of Engineering, Design and Technology, 18(6), pp. 1907-1926. ISSN 1726-0531

Dmaidi, N (1995) Simplified estimating and control procedures for the offshore oil construction industry. PhD thesis, University of Dundee, UK.

Dodanwala, T C and Santoso, D S (2022) The mediating role of job stress on the relationship between job satisfaction facets and turnover intention of the construction professionals. Engineering, Construction and Architectural Management, 29(4), pp. 1777-1796. ISSN 0969-9988

Dodd, J and Langford, D A (1990) Construction management on one large project in London: A case study. Construction Management and Economics, 8(4), pp. 385-398. ISSN 01446193

Dodd, J R (2021) Maximizing benchmarking initiatives in the built environment for sustained continuous improvement. PhD thesis, University of North Carolina at Charlotte, USA.

Doherty, M M (2022) Exploring the expansion of planners' engagement capabilities via accessing the data from a building information model for public consultation. PhD thesis, Northumbria University, UK.

Doloi, H (2009) Relational partnerships: The importance of communication, trust and confidence and joint risk management in achieving project success. Construction Management and Economics, 27(11), pp. 1099-1109. ISSN 1466433X

Doloi, H (2010) Benchmarking a new design management system using process simulation approach. Construction Innovation, 10(1), pp. 42-59. ISSN 1471-4175

Doloi, H (2013) Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3), pp. 267-279. ISSN 0733-9364

Doloi, H (2014) Rationalizing the implementation of web-based project management systems in construction projects using PLS-SEM. Journal of Construction Engineering and Management, 140(7): 04014026, ISSN 0733-9364

Doloi, H (2018) Community-centric model for evaluating social value in projects. Journal of Construction Engineering and Management, 144(5): 04018019, ISSN 0733-9364

Domingo, N (2011) Reducing construction waste in healthcare projects: a project lifecycle approach. PhD thesis, Loughborough University, UK.

Domingo, N; Osmani, M and Price, A D F (2008) Reducing construction waste in healthcare facilities: A project lifecycle approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Domingo, N; Osmani, M and Price, A D F (2009) Construction waste minimisation in the UK healthcare industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Donato, V; Lo Turco, M and Bocconcino, M M (2018) BIM-QA/QC in the architectural design process. Architectural Engineering and Design Management, 14(3), pp. 239-254. ISSN 1745-2007

Donyavi, S and Flanagan, R (2009) The impact of effective material management on construction site performance for small and medium sized construction enterprises. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Dossick, C; Osburn, L and Neff, G (2025) Innovation through practice: The messy work of making technology useful for architecture, engineering and construction teams. Engineering, Construction and Architectural Management, 32(7), pp. 4887-4899. ISSN 0969-9988

Dosumu, O (2018) Assessment of the likelihood of risk occurrence on tendering and procurement of construction projects. Journal of Construction Business and Management, 2(1), pp. 20-32. ISSN 2521-0165

Doukari, O; Kassem, M; Scoditti, E; Aguejdad, R and Greenwood, D (2024) A BIM based tool for evaluating building renovation strategies: The case of three demonstration sites in different European countries. Construction Innovation, 24(1), pp. 365-383. ISSN 1471-4175

Dowsett, R and Harty, C (2015) Moving from static to dynamic measures of BIM success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Dowsett, R; Harty, C and Davies, R (2017) Epistemological differences and new technology in construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Dreschler, M (2009) Fair competition: How to apply the 'economically most advantageous tender' award mechanism in the Dutch construction industry. PhD thesis, Delft University of Technology, Netherlands.

Driza, P J N and Park, N K (2014) Occupant satisfaction in LEED-certified higher education buildings. Smart and Sustainable Built Environment, 3(3), pp. 223-236. ISSN 2046-6099

Du, J (2012) Investigation of interpersonal cooperation in construction project teams: An agent-based modeling approach. PhD thesis, Michigan State University, USA.

Du, J; Kim, B C and Zhao, D (2016) Cost performance as a stochastic process: EAC projection by Markov chain simulation. Journal of Construction Engineering and Management, 142(6): 04016009, ISSN 0733-9364

Du, J; Xue, Y; Sugumaran, V; Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(4), pp. 1601-1635. ISSN 0969-9988

Dubey, K K (2001) A framework for analysing quality in the US homebuilding industry. PhD thesis, Swansea University, UK.

Dubler, C R (2011) Evaluating waste associated with building information exchange using lean theory. PhD thesis, Pennsylvania State University, USA.

Dudhee, V and Vukovic, V (2023) Building information model visualisation in augmented reality. Smart and Sustainable Built Environment, 12(4), pp. 919-934. ISSN 2046-6099

Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.

Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364

Duke, A K (2001) A telepresence environment for concurrent life-cycle design and construction. PhD thesis, Loughborough University, UK.

Dulaimi, M F (1991) Job behaviour of site managers: Its determinants and assessment. PhD thesis, University of Bath, UK.

Dulaimi, M F; Nepal, M P and Park, M (2005) A hierarchical structural model of assessing innovation and project performance. Construction Management and Economics, 23(6), pp. 565-577. ISSN 01446193

Duncheva, T and Bradley, F F (2019) Multifaceted productivity comparison of off-site timber manufacturing strategies in mainland Europe and the United Kingdom. Journal of Construction Engineering and Management, 145(8): 04019043, ISSN 0733-9364

Dunne, K O (2006) Effective leadership in the multi-faceted client organisation: A case study on the Olympic client coalition. PhD thesis, University College London, UK.

Durdyev, S and Mbachu, J (2011) On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures. Construction Economics and Building, 11(3), pp. 18-33. ISSN 2204-9029

Durdyev, S and Mbachu, J (2018) Key constraints to labour productivity in residential building projects: Evidence from Cambodia. International Journal of Construction Management, 18(5), pp. 385-393. ISSN 1562-3599

Duren, J V; Dorée, A and Voordijk, H (2015) Perceptions of success in performance-based procurement: Differences between clients and contractors. Construction Innovation, 15(1), pp. 107-128. ISSN 1471-4175

Durnall, T (2010) Attitudes to externalization and reform in local authority projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Durnall, T J and Proverbs, D (2009) An alternative model of motivation for steeplejacks within the petrochemical and power generation industries. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Duva, M (2022) A multi-level and in-depth analysis of AEC project networks: Topology, social influence, and intervention. PhD thesis, Michigan State University, USA.

Duva, M; Mollaoglu, S; Zhao, D and Frank, K A (2024) A framework for social network interventions in AEC teams: Strategies and implications. Journal of Construction Engineering and Management, 150(2): 05023016, ISSN 0733-9364

Duyshart, B; Walker, D; Mohamed, S and Hampson, K (2003) An example of developing a business model for information and communication technologies (ICT) adoption on construction projects: the national museum of Australia project. Engineering, Construction and Architectural Management, 10(3), pp. 179-192. ISSN 0969-9988

Dwairi, S (2018) Development of an Ontology-based framework and tool for Employer Information Requirements (OntEIR). PhD thesis, University of the West of England, Bristol, UK.

Dyson, K; Matthews, J and Love, P E D (2016) Critical success factors of adapting heritage buildings: An exploratory study. Built Environment Project and Asset Management, 6(1), pp. 44-57. ISSN 2044-124X

Dzitouo, M (2024) Project performance of relational contracting: A critical success factors perspective. PhD thesis, Capella University, USA.

Dzokoto, F K (2016) Information behaviour of construction project actors. PhD thesis, Loughborough University, UK.

Dzokoto, F K; Edum-Fotwe, F and Demian, P (2014) Conceptualising actors' information behaviour: An investigation into project information dynamics. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Eadie, R; Millar, P and Grant, R (2013) PFI/PPP, private sector perspectives of UK transport and healthcare. Built Environment Project and Asset Management, 3(1), pp. 89-104. ISSN 2044-124X

East, E W and Kim, S (1993) Standardizing scheduling data exchange. Journal of Construction Engineering and Management, 119(2), pp. 215-225. ISSN 0733-9364

Eaton, D (2000) A phenomenologically based contingent anatomy of competitive advantage within the construction industry. PhD thesis, University of Salford, UK.

Eaton, D; Akbiyikli, R; de Lemos, T; Gunnigan, L; Ozen Kutanis, R; Casensky, M; Ladra, J and el Sawalhi, N (2007) An examination of the suitability of a UK PFI model within the Czech Republic, the Republic of Ireland, Palestine (Gaza-West bank), Portugal and Turkey. Construction Innovation, 7(1), pp. 122-142. ISSN 1471-4175

Ebekozien, A (2022) Construction companies' compliance to personal protective equipment on junior staff in Nigeria: Issues and solutions. International Journal of Building Pathology and Adaptation, 40(4), pp. 481-498. ISSN 23984708

Ebekozien, A; Aigbavboa, C; Samsurijan, M S and Thwala, W D (2025) Developing a framework for mitigating pilfering: a case study of selected Nigeria's construction sites via soft system methodology. International Journal of Construction Management, 25(6), pp. 672-681. ISSN 1562-3599

Ebekozien, A; Aigbavboa, C O; Aigbedion, M; Ogbaini, I F and Aginah, I L (2023) Integrated project delivery in the Nigerian construction sector: An unexplored approach from the stakeholders' perspective. Engineering, Construction and Architectural Management, 30(4), pp. 1519-1535. ISSN 0969-9988

Ebrahimi, G and Dowlatabadi, H (2019) Perceived challenges in implementing integrated project delivery (IPD): Insights from stakeholders in the U.S. And Canada for a path forward. International Journal of Construction Education and Research, 15(4), pp. 291-314. ISSN 1557-8771

Ebrahimy, Y; AbouRizk, S M; Fernando, S and Mohamed, Y (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(5), pp. 462-480. ISSN 0969-9988

Eccles, S; O'Reilly, M and Stovin, V (1997) Numerical modelling of contract strategy evaluation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Echezona, O N (2011) Client perception of engineering and construction services management in present-day Iraq: An exploratory study and assessment. PhD thesis, Walden University, USA.

Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Edwards, D J; Shaw, T and Holt, G D (1996) Electronic document management systems and the management of UK construction projects. Building Research & Information, 24(5), pp. 287-292. ISSN 0961-3218

Egbu, C O; Gaskell, C and Howes, J (2001) The role of organizational culture and motivation in the effective utilization of information technology for teamworking in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Egwim, C N; Alaka, H; Toriola-Coker, L O; Balogun, H; Ajayi, S and Oseghale, R (2023) Extraction of underlying factors causing construction projects delay in Nigeria. Journal of Engineering, Design and Technology, 21(5), pp. 1323-1342. ISSN 1726-0531

Egwunatum, S I; Anumudu, A C; Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(1), pp. 354-382. ISSN 0969-9988

Eilers, H I (2015) Impact of sustainable business practices on strategic performance for commercial building contractors. PhD thesis, University of Kansas, USA.

Eissa, R; Eid, M S and Elbeltagi, E (2021) Current applications of game theory in construction engineering and management research: A social network analysis approach. Journal of Construction Engineering and Management, 147(7): 0002085, ISSN 0733-9364

Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects. PhD thesis, Aston University, UK.

Ekström, D (2019) Integrated structural and construction engineering: a study of project team performance in Swedish bridge design. PhD thesis, Chalmers University of Technology, Sweden.

Ekström, D; Rempling, R and Plos, M (2019) Integrated project team performance in early design stages: performance indicators influencing effectiveness in bridge design. Architectural Engineering and Design Management, 15(4), pp. 249-266. ISSN 1745-2007

Ekundayo, D O (2020) Quantity surveying education and the benchmarking of future needs. PhD thesis, University of Salford, UK.

Ekung, S; Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: A multivariate analysis. African Journal of Built Environment Research, 5(1), pp. 19-40. ISSN 2414-0236

Ekyalimpa, Ronald (2015) A distributed simulation approach for contractor company performance management in the construction industry. PhD thesis, University of Alberta, Canada.

El Asmar, M (2012) Modeling and benchmarking performance for the integrated project delivery (IPD) system. PhD thesis, University of Wisconsin - Madison, USA.

El Asmar, M; Hanna, A S and Chang, C K (2009) Monte Carlo simulation approach to support alliance team selection. Journal of Construction Engineering and Management, 135(10), pp. 1087-1095. ISSN 0733-9364

El Asmar, M; Hanna, A S and Loh, W Y (2016) Evaluating integrated project delivery using the project quarterback rating. Journal of Construction Engineering and Management, 142(1): 04015046, ISSN 0733-9364

El Asmar, M; Lotfallah, W; Whited, G and Hanna, A S (2010) Quantitative methods for design-build team selection. Journal of Construction Engineering and Management, 136(8), pp. 904-912. ISSN 0733-9364

El Ghazali, Y (2013) Implications of RFID in a supply chain: Process, knowledge management and performance. PhD thesis, Ecole Polytechnique, Montreal, Canada.

El Reifi, M H (2016) A novel lean briefing process for effective design management. PhD thesis, Loughborough University, UK.

El Sawalhi, N I and El Agha, O (2017) Multi-attribute utility theory for selecting an appropriate procurement method in the construction projects. Journal of Construction in Developing Countries, 22(1), pp. 75-96. ISSN 1823-6499

El Tayeh, A (2008) Social web-based systems for supporting geographically dispersed project teams in the architecture-engineering-construction industry. PhD thesis, University of Manchester, UK.

El Wardani, M A; Messner, J I and Horman, M J (2006) Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132(3), pp. 230-238. ISSN 0733-9364

El-Diraby, T A and Gill, S M (2006) A taxonomy for construction terms in privatized-infrastructure finance: Supporting semantic exchange of project risk information. Construction Management and Economics, 24(3), pp. 271-285. ISSN 01446193

El-Gohary, N M and El-Diraby, T E (2010) Domain ontology for processes in infrastructure and construction. Journal of Construction Engineering and Management, 136(7), pp. 730-744. ISSN 0733-9364

El-Hamrawy, S A K; El-Maaty, A E A and Akal, A Y (2017) Proposed models to measure the quality of highway projects regression analysis vs statistical: fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Hamrawy, S A-K; Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.

El-Sabek, L M (2017) Framework for managing integration challenges of production planning and control in international construction mega-projects. PhD thesis, University of Toronto, Canada.

El-Sabek, L M and McCabe, B Y (2018) Framework for managing integration challenges of last planner system in IMPs. Journal of Construction Engineering and Management, 144(5): 04018022, ISSN 0733-9364

El-Sabek, L M and McCabe, B Y (2018) Coordination challenges of production planning in the construction of international mega-projects in the middle East. International Journal of Construction Education and Research, 14(2), pp. 118-40. ISSN 1557-8771

El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(5), pp. 639-653. ISSN 0969-9988

El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.

El-Tayeh, A and Gil, N (2007) Using digital socialization to support geographically dispersed AEC project teams. Journal of Construction Engineering and Management, 133(6), pp. 462-473. ISSN 0733-9364

El. Reifi, M H and Emmitt, S (2013) Perceptions of lean design management. Architectural Engineering and Design Management, 9(3), pp. 195-208. ISSN 1745-2007

ElNimr, A A (2011) Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework. PhD thesis, University of Alberta, Canada.

ElZomor, M A (2017) Development of the project definition rating index (PDRI) for small infrastructure projects. PhD thesis, Arizona State University, USA.

Elazhary, M and El-adaway, I H (2025) Enhancing management of transportation projects: Integration factors for using smart contracts. Journal of Construction Engineering and Management, 151(12): 04025201, ISSN 0733-9364

Elbarkouky, M M G (2010) A fuzzy consensus building framework for early alignment of construction project teams on the extent of their roles and responsibilities. PhD thesis, University of Alberta, Canada.

Elbarkouky, M M G and Fayek, A R (2011) Fuzzy similarity consensus model for early alignment of construction project teams on the extent of their roles and responsibilities. Journal of Construction Engineering and Management, 137(6), pp. 432-440. ISSN 0733-9364

Elbarkouky, M M G and Robinson Fayek, A (2011) Fuzzy preference relations consensus approach to reduce conflicts on shared responsibilities in the owner managing contractor delivery system. Journal of Construction Engineering and Management, 137(8), pp. 609-618. ISSN 0733-9364

Eldin, N and Hikle, V (2003) Pilot study of quality function deployment in construction projects. Journal of Construction Engineering and Management, 129(3), pp. 314-329. ISSN 0733-9364

Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364

Eldin, N N (1997) Concurrent engineering: A schedule reduction tool. Journal of Construction Engineering and Management, 123(3), pp. 354-362. ISSN 0733-9364

Eldin, N N (1999) Impact of employee, management, and process issues on constructability implementation. Construction Management and Economics, 17(6), pp. 711-720. ISSN 01446193

Eleftheriadis, E (2018) Decision-based and BIM-embedded optimisation framework for material, cost and carbon efficiency of RC building structures. PhD thesis, University College London, UK.

Eley, J (2001) How do post-occupancy evaluation and the facilities manager meet? Building Research & Information, 29(2), pp. 164-167. ISSN 0961-3218

Elf, M; Svedbo Engström, M and Wijk, H (2012) An assessment of briefs used for designing healthcare environments: A survey in Sweden. Construction Management and Economics, 30(10), pp. 835-844. ISSN 1466433X

Elgendi, E M O (2016) An automated dynamic site layout planning system: a case study of Egypt. PhD thesis, University of Salford, UK.

Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175

Elghaish, F; Abrishami, S; Hosseini, M R and Abu-Samra, S (2020) Revolutionising cost structure for integrated project delivery: A BIM-based solution. Engineering, Construction and Architectural Management, 28(4), pp. 1214-1240. ISSN 0969-9988

Elhegazy, H; Ebid, A; Mahdi, I; Haggag, S and Abdul-Rashied, I (2021) Implementing QFD in decision making for selecting the optimal structural system for buildings. Construction Innovation, 21(2), pp. 345-360. ISSN 1471-4175

Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.

Elliot, C and Palmer, A (1996) Life cycle energy analysis of the building resource. Journal of Financial Management of Property and Construction, 1(2), pp. 5-16. ISSN 1366-4387

Elmualim, A; Czwakiel, A; Valle, R; Ludlow, G and Shah, S (2009) The practice of sustainable facilities management: Design sentiments and the knowledge chasm. Architectural Engineering and Design Management, 5(1-2), pp. 91-102. ISSN 1745-2007

Elmualim, A A (2008) Moral leadership education in construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Elmualim, A A and Govender, K (2008) Communities of practice in UK large contracting firms: Contrasting application and non-utilized merits. Architectural Engineering and Design Management, 4(3-4), pp. 149-159. ISSN 1745-2007

Elnaas H, A P G K (2013) A decision evaluation model to choose between manufacturing off-site or on-site methods for construction of house building projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Elsayed, M A A; Lastovets, N; Pistore, L and Pelsmakers, S (2024) Summer-time performance of Finnish housing: Poe of five apartments. International Journal of Building Pathology and Adaptation, 43(8), pp. 1-25. ISSN 2398-4708

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.

Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects. PhD thesis, Heriot-Watt University, UK.

Eltigani, Hadi Mohammed Ahmed (1995) An investigation into the impact of quality management systems upon construction productivity at the site level. PhD thesis, University of Strathclyde, UK.

Elyamany, A and Abdelrahman, M (2010) Contractor performance evaluation for the best value of Superpave projects. Journal of Construction Engineering and Management, 136(5), pp. 606-614. ISSN 0733-9364

Emam, H (2021) Optimising project controls for construction using BIM and Big Data Analytics. PhD thesis, University of Bolton, UK.

Emere, C E; Clinton, C; Thwala, W D and Akinradewo, O I (2025) A principal component analysis of sustainable building construction features for project delivery in South Africa. Journal of Engineering, Design and Technology, 23(5), pp. 1463-1482. ISSN 1726-0531

Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.

Emsley, M (2005) A benefits analysis of partnering: A case study of a community primary school. Journal of Financial Management of Property and Construction, 10(1), pp. 69-79. ISSN 1366-4387

Emuze, F A (2011) Performance improvement in South African construction. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

Emuze, F A and Smallwood, J J (2011) Improving project delivery in South African construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Enache-Pommer, E (2010) A synergistic approach to green building delivery, lean principles and building information modeling in the design of healthcare facilities. PhD thesis, Pennsylvania State University, USA.

Engebø, A; Klakegg, O J; Lohne, J; Bohne, R A; Fyhn, H and Lædre, O (2022) High-performance building projects: How to build trust in the team. Architectural Engineering and Design Management, 18(6), pp. 774-790. ISSN 1745-2007

Engelen, L; Chau, J; Young, S; Mackey, M; Jeyapalan, D and Bauman, A (2019) Is activity-based working impacting health, work performance and perceptions? A systematic review. Building Research & Information, 47(4), pp. 468-479. ISSN 0961-3218

Engström, S; Stehn, L and Sardén, Y (2009) Competitive impact of industrialised building: In search for explanations to the current state. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Enoma, A (2005) The role of facilities management at the design stage. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Enshassi, A; Ayash, A and Mohamed, S (2018) Key barriers to the implementation of energy-management strategies in building construction projects. International Journal of Building Pathology and Adaptation, 36(1), pp. 15-40. ISSN 23984708

Enshassi, A; Mohamed, S and Abdel-Hadi, M (2013) Factors affecting the accuracy of pre-tender cost estimates in the Gaza Strip. Journal of Construction in Developing Countries, 18(1), pp. 73-94. ISSN 1823-6499

Enshassi, A A; Arain, F and El-Rayyes, Y (2014) Post-evaluation system in construction projects in Gaza Strip-Palestine. Journal of Construction in Developing Countries, 19(2), pp. 51-73. ISSN 1823-6499

Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model. PhD thesis, Iowa State University, USA.

Erbas, I (2013) Construction management project delivery system as a form of project implementation in Turkish public procurement. PhD thesis, Istanbul Technical University, Turkey.

Erbil, Y; Akincitürk, N and Acar, E (2013) Inter-organizational context of the innovation process and the role of architectural designers as system integrators: Case evidence from Turkey. Architectural Engineering and Design Management, 9(2), pp. 77-94. ISSN 1745-2007

Erfani, A (2023) Data-driven risk modeling for infrastructure projects using artificial intelligence techniques. PhD thesis, University of Maryland, College Park, USA.

Erfani, A; Cui, Q and Cavanaugh, I (2021) An empirical analysis of risk similarity among major transportation projects using natural language processing. Journal of Construction Engineering and Management, 147(12): 04021175, ISSN 0733-9364

Erfani, A; Ma, Z; Cui, Q and Baecher, G B (2023) Ex post project risk assessment: Method and empirical study. Journal of Construction Engineering and Management, 149(2): 04022174, ISSN 0733-9364

Erkoreka, A; Flores-Abascal, I; Escudero, C; Martin, K; Millan, J A and Sala, J M (2020) Flat roof hygrothermal performance testing and evaluation. International Journal of Building Pathology and Adaptation, 38(1), pp. 148-175. ISSN 23984708

Erlita, A; Amin, M and Bintoro, B P K (2023) Multiphase project risk management on food factory building construction: Consultant perspective. Journal of Construction in Developing Countries, 28(1), pp. 1-17. ISSN 1823-6499

Ershadi, Mahmoud (2021) Analysing and modelling the critical success factors of project management offices in the construction industry. PhD thesis, University of Newcastle, Australia.

Esa, M (2015) The influence of project manager’s cognitive styles on project success in the Malaysian construction industry. PhD thesis, University of Malaya, Malaysia.

Escamilla, E (2011) Investigation of project management planning practices for renovation of historical buildings in urban contexts located in Texas. PhD thesis, Texas A&M University, USA.

Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.

Essa, R and Fortune, C (2006) Project price forecasting processes and pre-construction evaluation of sustainable housing association projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Essa, R and Fortune, C (2008) Pre-construction evaluation practices of sustainable housing projects in the UK. Engineering, Construction and Architectural Management, 15(6), pp. 514-526. ISSN 0969-9988

Essa, R A (2008) A framework for the pre-construction evaluation of sustainable housing projects in the UK. PhD thesis, Heriot-Watt University, UK.

Essien, I O (2021) Modelling project complexity for leadership decision making and success in the building construction industry in Lagos, Nigeria. PhD thesis, Oxford Brookes University, UK.

Evans, M (2013) An investigation into occupants' satisfaction in UK sustainable social housing. PhD thesis, University of the West of England, Bristol, UK.

Evans, M (2022) Strategic frameworks for managing lean construction on megaprojects: towards global integrated delivery and corporate governance. PhD thesis, University of Bolton, UK.

Evans, M and Farrell, P (2023) A strategic framework managing challenges of integrating lean construction and integrated project delivery on construction megaprojects, towards global integrated delivery transformative initiatives in multinational organisations. Journal of Engineering, Design and Technology, 21(2), pp. 376-416. ISSN 1726-0531

Evarist, C; Luvara, V G M and Chileshe, N (2023) Perception on constraining factors impacting recruitment and selection practices of building contractors in Dar es Salaam, Tanzania. International Journal of Construction Management, 23(12), pp. 2012-2023. ISSN 1562-3599

Evdorides, H and Shoji, M (2013) Public-private partnerships for road infrastructure services in Zambia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 277-286. ISSN 17514312

Everett, J G and Slocum, A H (1994) Automation and robotics opportunities: Construction versus manufacturing. Journal of Construction Engineering and Management, 120(2), pp. 443-452. ISSN 0733-9364

Ewuga, D and Adesi, M (2023) Integrating sustainability practices into the Irish construction supply chain: Main contractors' perspective. Built Environment Project and Asset Management, 13(1), pp. 105-122. ISSN 2044-124X

Ewuga, D; Opiyo, N and Oyegoke, A S (2025) An evaluation of the delivery of quantity surveying degree apprenticeship in UK universities. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(3), pp. 180-187. ISSN 17514304

Ey, W; Zuo, J and Han, S (2014) Barriers and challenges of collaborative procurements: An exploratory study. International Journal of Construction Management, 14(3), pp. 148-155. ISSN 1562-3599

Eyiah-Botwe, E (2017) Development of a sustainable stakeholder management framework for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.

Fadnavis, Aishwarya Sunil (2026) An integrated coordination framework for construction procurement: Examining early supplier involvement through agent-based modeling. PhD thesis, University of Washington, USA.

Fageha, Mohammed Kamal (2014) Managing stakeholders' participation to improve project scope definition completeness and enhance project outcome. PhD thesis, University of Melbourne, Australia.

Fahmy, Sami W (2005) Comparative analysis of expected and actual performance of public design-build projects. PhD thesis, University of Calgary, Canada.

Fahy, P (2007) Cross cultural training and the effective integration of the construction supply chain. PhD thesis, University College London, UK.

Fallah-Aliabadi, S; Ostadtaghizadeh, A; Fatemi, F; Ardalan, A; Rezaei, E; Raadabadi, M and Heydari, A (2022) Hospital disaster resilience: Development of an assessment tool using expert panel and fuzzy analytical network process. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 554-567. ISSN 1759-5916

Falqi, I I A (2011) Knowledge capture and retrieval in construction projects. PhD thesis, Heriot-Watt University, UK.

Fan, C L (2020) Defect risk assessment using a hybrid machine learning method. Journal of Construction Engineering and Management, 146(9): 04020102, ISSN 0733-9364

Fan, L C N (2001) Strategic quality management for construction organisations. DBA thesis, Brunel University, UK.

Fang, D P; Huang, X Y and Hinze, J (2004) Benchmarking studies on construction safety management in China. Journal of Construction Engineering and Management, 130(3), pp. 424-432. ISSN 0733-9364

Fang, Z (2002) Behavioral analysis of project team performance in China. PhD thesis, University of Hong Kong, Hong Kong.

Fang, Z (2022) Machine learning integrated portfolio-based strategic building asset management. PhD thesis, University College London, UK.

Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(2), pp. 182-188. ISSN 0969-9988

Fapohunda, J A and Chileshe, N (2014) Essential factors towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(4), pp. 461-474.

Farag, F (2018) Understanding social value creation in public construction projects using systems thinking. PhD thesis, University of Salford, UK.

Farahani, A; Wallbaum, H and Dalenbäck, J O (2019) Optimized maintenance and renovation scheduling in multifamily buildings: a systematic approach based on condition state and life cycle cost of building components. Construction Management and Economics, 37(3), pp. 139-155. ISSN 01446193

Farghaly, K (2020) Building information modelling and asset management: Semantic and syntactic interoperability. PhD thesis, Oxford Brookes University, UK.

Farghaly, K; Abanda, F H; Vidalakis, C and Wood, G (2019) BIM-linked data integration for asset management. Built Environment Project and Asset Management, 9(4), pp. 489-502. ISSN 2044-124X

Farias, F (2013) Contemporary strategies for sustainable design. PhD thesis, Texas A&M University, USA.

Faris, H M A (2020) Improving project collaboration to minimise the energy performance gap in residential construction: case study of Kurdistan. PhD thesis, University of Portsmouth, UK.

Farnsworth, C B; Warr, R O; Weidman, J E and Mark Hutchings, D (2016) Effects of CM/GC project delivery on managing process risk in transportation construction. Journal of Construction Engineering and Management, 142(3): 04015091, ISSN 0733-9364

Farran, H H (1993) A study of the implementation and impact of turn-key management contracts in hospitals in the kingdom of Saudi Arabia. PhD thesis, Swansea University, UK.

Farrell, L M (2001) Financial agency issues in mortgage underwriting and real estate valuation. Journal of Financial Management of Property and Construction, 6(2), pp. 119-137. ISSN 1366-4387

Farrokhshad, M; Chan, P W and Blackwell, P (2016) Opening up risk management through goffman's dramaturgical approach. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Farrow, C B (2016) Problem-solving styles in the Southeast construction industry. EdD thesis, Auburn University, USA.

Fateminia, Seyed Hamed (2023) Determining and managing contingency reserve throughout the lifecycle of construction projects. PhD thesis, University of Alberta, Canada.

Fathi, M (2020) Public-private partnership contract framework development and project performance analysis compared to design-build in the US highway projects. PhD thesis, University of Nevada, Las Vegas, USA.

Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.

Faubel, C.; Mowen, D.; Miri, M.; Demarquet Alban, U.; Martinez-Molina, A. and Alamaniotis, M. (2026) Multimodal transformer models for real-time estimation of indoor environmental quality in educational settings. Smart and Sustainable Built Environment, pp. 1-37. ISSN 2046-6099

Faulkenberry, L M (1993) Impact of emerging contract employment patterns on training, competitiveness, and company operation in the electrical construction industry. EdD thesis, Texas A&M University, USA.

Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system. PhD thesis, Eindhoven University of Technology, Netherlands.

Fayazi, M (2011) Reconstruction projects by using core housing method in Iran: Case study: Gilan province experience. International Journal of Disaster Resilience in the Built Environment, 2(1), pp. 74-85. ISSN 1759-5916

Fayek, A R and Golabchi, A (2022) Framework for identification of performance metrics for research and development collaborations: Construction innovation centre. Built Environment Project and Asset Management, 12(5), pp. 837-852. ISSN 2044-124X

Fazeli, A; Jalaei, F; Khanzadi, M and Banihashemi, S (2022) BIM-integrated TOPSIS-fuzzy framework to optimize selection of sustainable building components. International Journal of Construction Management, 22(7), pp. 1240-1259. ISSN 1562-3599

Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193

Federle, M O (1990) Substitutes for leadership in the environment of unionized construction carpenters. PhD thesis, University of Michigan, USA.

Federle, M O and Maloney, W F (1992) Substitutes for leadership and unionized construction carpenters. Journal of Construction Engineering and Management, 118(2), pp. 332-348. ISSN 0733-9364

Feghaly, J (2020) Innovative delivery of water infrastructure projects. PhD thesis, Arizona State University, USA.

Feghaly, J; El Asmar, M; Ariaratnam, S and Bearup, W (2020) Selecting project delivery methods for water treatment plants. Engineering, Construction and Architectural Management, 27(4), pp. 936-951. ISSN 0969-9988

Feldman, G; Shah, H; Chapman, C; Pärn, E A and Edwards, D J (2017) A systematic approach for enterprise systems upgrade decision-making: Outlining the decision processes. Journal of Engineering, Design and Technology, 15(6), pp. 778-802.

Fellows, R and Liu, A (2010) Conflict on multi-national construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 101-109. ISSN 17514312

Feng, C-W (1998) Applications of genetic algorithms for multi-objective resource allocation of construction projects under certainty. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Feng, Y and Trinh, M T (2019) Developing resilient safety culture for construction projects. Journal of Construction Engineering and Management, 145(11), ISSN 0733-9364

Ferdosi, H; Abbasianjahromi, H; Banihashemi, S and Ravanshadnia, M (2023) BIM applications in sustainable construction: Scientometric and state-of-the-art review. International Journal of Construction Management, 23(12), pp. 1969-1981. ISSN 1562-3599

Fereshtehnejad, S (2018) Multi-hazard lifecycle methods for aging structures and infrastructure systems. PhD thesis, Ohio State University, USA.

Fergusson, K J (1993) Impact of integration on industrial facility quality. PhD thesis, Stanford University, USA.

Fernandes, D A; Costa, A A and Lahdenperä, P (2018) Key features of a project alliance and their impact on the success of an apartment renovation: A case study. International Journal of Construction Management, 18(6), pp. 482-496. ISSN 1562-3599

Fernandez-Solis, J L; Porwal, V; Lavy, S; Shafaat, A; Rybkowski, Z K; Son, K and Lagoo, N (2013) Survey of motivations, benefits, and implementation challenges of last planner system users. Journal of Construction Engineering and Management, 139(4), pp. 354-360. ISSN 0733-9364

Fernando, M H V; Costa, D D; Malsha Nadeetharu, B K and Kulatunga, U (2024) Application of lean principles for building refurbishment projects in Sri Lanka. Built Environment Project and Asset Management, 14(2), pp. 244-259. ISSN 2044-124X

Fernando, P G; Kulatunga, U; Thayaparan, M and Hadiwattege, C (2025) Reforming legal and regulatory structure of public–private partnerships in Sri Lanka. Built Environment Project and Asset Management, 15(2), pp. 211-227. ISSN 2044-124X

Fernando, S; Panuwatwanich, K and Thorpe, D (2021) Introducing an innovation promotion model for construction projects. Engineering, Construction and Architectural Management, 28(3), pp. 728-746. ISSN 0969-9988

Fernie, S; Leiringer, R and Thorpe, T (2006) Change in construction: A critical perspective. Building Research & Information, 34(2), pp. 91-103. ISSN 0961-3218

Fernández-Solís, J L; Rybkowski, Z K; Xiao, C; Lü, X and Chae, L S (2015) General contractor's project of projects: a meta-project: Understanding the new paradigm and its implications through the lens of entropy. Architectural Engineering and Design Management, 11(3), pp. 213-242. ISSN 1745-2007

Ferreira, Sérgio Leal (2005) Proposal of IFC model extension with ies LM-63 contribution: Luminaire in building lifecycle. PhD thesis, Universidade de São Paulo, Brazil.

Ferreira, Tiago de Vasconcelos Gonçalves (2025) High-resolution dynamic model integrated with BIM for performance evaluation in building water distribution systems. PhD thesis, Universidade de São Paulo, Brazil.

Fetterhoff III, O G (2004) Comparative evaluation of strategic construction-market forecasting methodologies. PhD thesis, University of Florida, USA.

Fialho, Beatriz Campos (2021) Design for smart maintenance enabled by BIM and IoT. PhD thesis, Universidade de São Paulo, Brazil.

Filippi, Giancarlo Azevedo de (2017) Method for production planning and deadline management of real estate ventures. PhD thesis, Universidade de São Paulo, Brazil.

Fillingham, V L (2018) Assessing information management as a tool for the ongoing maintenance of built assets. EngD thesis, University of Reading, UK.

Finnie, D; Ali, N A and Park, K (2018) Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 176-185. ISSN 17514304

Finnie, D; Ameer Ali, N and Park, K (2021) Early contractor involvement: a review of pre-construction service agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 143-150. ISSN 17514304

Fireman, M C T; Saurin, T A; Formoso, C T; Koskela, L and Tommelein, I D (2023) Slack in production planning and control: A study in the construction industry. Construction Management and Economics, 41(3), pp. 256-276. ISSN 01446193

Firouzi, A and Vahdatmanesh, M (2019) Applicability of financial derivatives for hedging material price risk in highway construction. Journal of Construction Engineering and Management, 145(5): 04019023, ISSN 0733-9364

Firth, S K; Lomas, K J and Wright, A J (2010) Targeting household energy-efficiency measures using sensitivity analysis. Building Research & Information, 38(1), pp. 25-41. ISSN 0961-3218

Fischer, M A (1991) Using construction knowledge during preliminary design of reinforced concrete structures. PhD thesis, Stanford University, USA.

Fischer, M A and Adams, H (2011) Engineering-based decisions in construction. Journal of Construction Engineering and Management, 137(10), pp. 751-754. ISSN 0733-9364

Fisher, A D and Robitaille, A M (2011) Replacement of the movable span of the Thames River Bridge: How 19th century technology impacted 21st century construction. Journal of Construction Engineering and Management, 137, pp. 895-900. ISSN 0733-9364

Fisher, N (1990) The use of structured data analysis as a construction management research tool: 1. The technique. Construction Management and Economics, 8(4), pp. 341-362. ISSN 01446193

Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments. PhD thesis, Columbia University, USA.

Fitch, G J; Odeh, I and William Ibbs, C (2015) Economic sustainability of dbo water based on wastewater projects in the U.S.: Three case studies. Journal of Construction Engineering and Management, 141(5): 05015001, ISSN 0733-9364

Fletcher, S L (2001) Developing disassembly strategies for buildings to reduce the lifetime environmental impacts by applying a systems approach. PhD thesis, University of Sheffield, UK.

Flett, P (2001) The role of quality in the management of projects. PhD thesis, University of Stirling, UK.

Fobiri, G; Musonda, I and Muleya, F (2025) Unlocking the full potential of reality capture for construction project cost monitoring: A mixed review. Journal of Engineering, Design and Technology, 23(3), pp. 830-853. ISSN 1726-0531

Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.

Foju, B A (1993) The role of facilities management (maintenance) on office worker performance in Yaounde, Cameroon. ArchDr thesis, University of Michigan, USA.

Fong, P S W and Lung, B W C (2007) Interorganizational teamwork in the construction industry. Journal of Construction Engineering and Management, 133(2), pp. 157-168. ISSN 0733-9364

Fong, Patrick Sik-wah (2001) Understanding knowledge creation: A study of the processes, interrelationships and contributory factors within multidisciplinary project teams. PhD thesis, University of Warwick, UK.

Forbes, Lincoln Harding (1999) An engineering management-based investigation of owner satisfaction, quality and performance variables in health care facilities construction. PhD thesis, University of Miami, USA.

Forcada, N; MacArulla, M; Gangolells, M and Casals, M (2014) Assessment of construction defects in residential buildings in Spain. Building Research & Information, 42(5), pp. 629-640. ISSN 0961-3218

Forcada, N; Macarulla, M; Gangolells, M and Casals, M (2016) Handover defects: Comparison of construction and post-handover housing defects. Building Research & Information, 44(3), pp. 279-288. ISSN 0961-3218

Forcada, N; Macarulla, M and Love, P E D (2013) Assessment of residential defects at post-handover. Journal of Construction Engineering and Management, 139(4), pp. 372-378. ISSN 0733-9364

Ford, D N; Anderson, S D; Damron, A J; De Las Casas, R; Gokmen, N and Kuennen, S T (2004) Managing constructibility reviews to reduce highway project durations. Journal of Construction Engineering and Management, 130(1), pp. 33-42. ISSN 0733-9364

Forman, M (2013) Inertia and change: Lean construction and health and safety work on construction sites. Construction Management and Economics, 31(6), pp. 647-660. ISSN 1466433X

Formoso, C T and Jobim, M S S (2006) Challenges in improving customer focus in small-sized house-building companies in Brazil. Journal of Construction in Developing Countries, 11(2), pp. 77-101. ISSN 1823-6499

Formoso, C T; Santos, A D and Powell, J A (2002) An exploratory study on the applicability of process transparency in construction sites. Journal of Construction Research, 3(1), pp. 35-54. ISSN 1609-9451

Forooraghi, M; Miedema, E; Ryd, N; Wallbaum, H and Babapour Chafi, M (2023) Relationship between the design characteristics of activity-based flexible offices and users' perceptions of privacy and social interactions. Building Research & Information, 51(5), pp. 588-604. ISSN 0961-3218

Forsythe, A E (2008) The lack of a clearly defined retention strategy and the impact of the retention of civil engineers. PhD thesis, Capella University, USA.

Forsythe, P (2015) Monitoring customer perceived service quality and satisfaction during the construction process. Construction Economics and Building, 15(1), pp. 19-42. ISSN 2204-9029

Forsythe, P J (2016) Construction service quality and satisfaction for a targeted housing customer. Engineering, Construction and Architectural Management, 23(3), pp. 323-348. ISSN 0969-9988

Forsythe, Perry (2003) The role of service quality as a determinant of customer satisfaction in residential construction. PhD thesis, University of New South Wales, Australia.

Fortune, C and Cox, O (2005) Current practices in building project contract price forecasting in the UK. Engineering, Construction and Architectural Management, 12(5), pp. 446-457. ISSN 0969-9988

Foster, J A and Poston, A (2024) Occupant experience of domestic kitchen environments in low-energy social and affordable housing in Scotland. Building Research & Information, 52(7), pp. 799-816. ISSN 0961-3218

Francis, A; Padmanabhan, V and Thomas, A (2025) A life cycle assessment-based case study analysis of the sustainability of "vernacular" versus contemporary construction techniques. Engineering, Construction and Architectural Management, 32(9), pp. 6187-6212. ISSN 0969-9988

Francis, A (2017) Simulating uncertainties in construction projects with chronographical scheduling logic. Journal of Construction Engineering and Management, 143(1): 04016085, ISSN 0733-9364

Franco, L A (2005) Problem structuring methods for collaboration: A conceptual development, with an application to a construction partnership in the UK. PhD thesis, London School of Economics and Political Science, UK.

Franco, Luiz Sergio (1992) Application of constructive rationalization guidelines for the technological development of constructive processes in unreinforced structural masonry. PhD thesis, Universidade de São Paulo, Brazil.

Franco, M and Rodrigues, M (2022) Indicators to measure the performance of sustainable urban entrepreneurship: An empirical case study applied to Portuguese cities and towns. Smart and Sustainable Built Environment, 11(1), pp. 19-38. ISSN 2046-6099

Francom, T C (2015) Performance of the construction manager at risk (CMAR) delivery method applied to pipeline construction projects. PhD thesis, Arizona State University, USA.

Francom, T C and El Asmar, M (2015) Project quality and change performance differences associated with the use of building information modeling in design and construction projects: Univariate and multivariate analyses. Journal of Construction Engineering and Management, 141(9): 4015028, ISSN 0733-9364

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Franke, M and Nadler, C (2021) Towards a holistic approach for assessing the impact of IEQ on satisfaction, health, and productivity. Building Research & Information, 49(4), pp. 417-444. ISSN 0961-3218

Franz, B; Leicht, R; El Asmar, M and Molenaar, K (2022) Methodological consistency for quantitative analysis and reporting in project delivery system performance research. Journal of Construction Engineering and Management, 148(9): 04022080, ISSN 0733-9364

Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364

Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364

Franz, B and Roberts, B A M (2022) Thematic analysis of successful and unsuccessful project delivery teams in the building construction industry. Journal of Construction Engineering and Management, 148(3): 05022001, ISSN 0733-9364

Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.

Franz, B W and Leicht, R M (2016) An alternative classification of project delivery methods used in the United States building construction industry. Construction Management and Economics, 34(3), pp. 160-173. ISSN 01446193

Franz, B W; Leicht, R M and Riley, D R (2013) Project impacts of specialty mechanical contractor design involvement in the health care industry: Comparative case study. Journal of Construction Engineering and Management, 139(9), pp. 1091-1097. ISSN 0733-9364

Franz, B W and Olopade, J (2024) Exploring pathways to project success through project delivery team integration: A qualitative comparative analysis. Construction Management and Economics, 42(6), pp. 564-581. ISSN 01446193

Frommweiler, C and Poirier, E (2025) Facilitating the building commissioning process using building information modeling: An action-research project. Engineering, Construction and Architectural Management, 32(1), pp. 601-620. ISSN 0969-9988

Frödell, M (2014) Organisation of purchasing and buyer-supplier relationships in large construction companies. PhD thesis, Chalmers University of Technology, Sweden.

Fu, C (2006) Integration and interoperability of IT applications and information in construction - a study in nD modelling. PhD thesis, University of Salford, UK.

Fu, X (2010) Refinancing and restructuring projects utilising project finance in developing countries. PhD thesis, University of Manchester, UK.

Fuentes-Del-Burgo, J and Navarro-Astor, E (2016) What is engineering education for? Listening to the voices of some Spanish building engineers. Journal of Engineering, Design and Technology, 14(4), pp. 897-919.

Fuller, P A (2011) Improving lessons learnt outcomes in multi-phase project environments. PhD thesis, Loughborough University, UK.

Fung, C K A (1996) Development of a TQM model for improving business performance based on surveys conducted in Hong Kong, Japan and the UK. PhD thesis, De Montfort University, UK.

Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.

Gaddala, K and Raju, P S (2020) Optimal location of UPQC for power quality improvement: Novel hybrid approach. Journal of Engineering, Design and Technology, 18(6), pp. 1519-1541. ISSN 1726-0531

Gade, A N; Jensen, R L; Larsen, T S; Nissen, S B and Andresen, I (2021) Value-based decision making in the pre-design stage of sustainable building renovation projects–exploring two methods for weighting criteria. International Journal of Construction Management, 21(6), pp. 648-663. ISSN 1562-3599

Gajendran, T and Brewer, G (2012) Cultural consciousness and the effective implementation of information and communication technology. Construction Innovation, 12(2), pp. 179-197. ISSN 1471-4175

Gajendran, T; Brewer, G; Runeson, G and Dainty, A (2011) Investigating informality in construction: Philosophy, paradigm and practice. Construction Economics and Building, 11(2), pp. 84-98. ISSN 2204-9029

Gajjar, D; Lucas, J and Davis, D (2023) Understanding employee perception to promote management level workforce development for roofing contractors. International Journal of Construction Education and Research, 19(2), pp. 221-238. ISSN 1557-8771

Gallardo, Amarilis Lucia Casteli Figueiredo (2004) Evaluation of the environmental management practices in the construction of the descending roadway of imigrantes highway. PhD thesis, Universidade de São Paulo, Brazil.

Galotti, V (2025) An exploration of design-build risk and project profitability in the architecture, engineering and construction sector. PhD thesis, University of Colorado at Boulder, USA.

Gambatese, J A (1996) Addressing construction worker safety in the project design. PhD thesis, University of Washington, USA.

Gambatese, J A and Hallowell, M (2011) Enabling and measuring innovation in the construction industry. Construction Management and Economics, 29(6), pp. 553-567. ISSN 1466433X

Gambatese, J A; Michael Toole, T and Abowitz, D A (2017) Owner perceptions of barriers to prevention through design diffusion. Journal of Construction Engineering and Management, 143(7): 04017016, ISSN 0733-9364

Gameson, R and Sher, W (2002) An investigation into project team dynamics and the utilization of virtual environments. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Gameson, R; Suresh, S and Chinyio, E (2008) Project debriefing: A multi-domain review of practices and procedures. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Gan, C E (1998) Organizational interactions in the management of development projects. PhD thesis, National University of Singapore, Singapore.

Gan, X; Jia, J; Le, Y and Hu, Y (2024) Transforming vertical leadership into shared leadership in infrastructure project teams: A dual-pathway perspective. Engineering, Construction and Architectural Management, 31(8), pp. 3097-3123. ISSN 0969-9988

Ganah, A A M (2003) The use of computer visualisation in communicating constructability information in UK. Journal of Engineering, Design and Technology, 1(2), pp. 151-167. ISSN 1726-0531

Ganah, A A M (2003) Computer visualisation support for buildability. PhD thesis, Loughborough University, UK.

Ganah, A A M; Anumba, C J and Bouchlaghem, N M (2000) The use of visualization to communicate design information to construction sites. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Gangatheepan, S (2023) Workplace-based learning: a study in BIM-enabled construction projects. PhD thesis, Birmingham City University, UK.

Ganiyu, S (2021) Developing a Bim-Knowledge (Bim-K) framework for improved decision-making in building construction projects. PhD thesis, London South Bank University, UK.

Gann, D M; Salter, A J and Whyte, J K (2003) Design quality indicator as a tool for thinking. Building Research & Information, 31(5), pp. 318-333. ISSN 0961-3218

Gao, M Y; Han, J; Yang, Y; Tiong, R L K; Zhao, C and Han, C (2024) BIM-based and IoT-driven smart tracking for precast construction dynamic scheduling. Journal of Construction Engineering and Management, 150(9): 04024117, ISSN 0733-9364

Gao, S; Chan, T K and Hendy, P (2025) Adoption of the digitalised last planner system in infrastructure projects: An Australian case study. Construction Innovation, 25(3), pp. 994-1013. ISSN 1471-4175

Gao, Y; Gan, Y; Chen, Y and Chen, Y (2025) Application of large language models to intelligently analyze long construction contract texts. Construction Management and Economics, 43(3), pp. 226-242. ISSN 0144-6193

Gao, Z (2004) Investigation of technologies to improve the visualization of design documents and construction process. PhD thesis, Iowa State University, USA.

Gao, Z; Walters, R C; Jaselskis, E J and Wipf, T J (2006) Approaches to improving the quality of construction drawings from owner's perspective. Journal of Construction Engineering and Management, 132(11), pp. 1187-1192. ISSN 0733-9364

Garcia, A J and Mollaoglu, S (2020) Measuring key knowledge-related factors for individuals in AEC project teams. Journal of Construction Engineering and Management, 146(7): 04020063, ISSN 0733-9364

Garcia, G; Golparvar-Fard, M; De La Garza, J M and Fischer, M (2021) Measuring progress and productivity in model-driven engineering for capital project delivery. Journal of Construction Engineering and Management, 147(4): 04021009, ISSN 0733-9364

Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364

Garciacortes, A (2017) Knowledge transfer and application in integrated project delivery teams. PhD thesis, Michigan State University, USA.

García de Soto, B; Agustí-Juan, I; Joss, S and Hunhevicz, J (2022) Implications of construction 4.0 to the workforce and organizational structures. International Journal of Construction Management, 22(2), pp. 205-217. ISSN 1562-3599

Garnett, N A (2001) Changing construction performance using lean construction: An action research approach. PhD thesis, University of Reading, UK.

Garrido Martins, C (2019) Assessment of project risks in fast-track construction projects. PhD thesis, University of New Mexico, USA.

Garsden, B R (1995) Postconstruction evaluation. Journal of Construction Engineering and Management, 121(1), pp. 37-42. ISSN 0733-9364

Garvin, M J (2010) Enabling development of the transportation public-private partnership market in the United States. Journal of Construction Engineering and Management, 136(4), pp. 402-411. ISSN 0733-9364

Gasu, M B (2020) Residents' satisfaction with the use of green infrastructure in Osogbo, Osun State, Nigeria. African Journal of Built Environment Research, 4(1), pp. 1-19. ISSN 2414-0236

Gbiengu, P.; Khan, M.; Nnaji, C. and Karakhan, A. A. (2026) Enhancing employee retention in construction: Role of workforce sustainability attributes. International Journal of Construction Management, 26(9), pp. 1815-1835. ISSN 1562-3599

Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X

Gehrig, G B (2002) A decision support system framework to improve design-construction integration and project performance on public sector underground utility projects. PhD thesis, Colorado State University, USA.

Geng, L; Herath, N; Hui, F K P; Liu, X; Duffield, C and Zhang, L (2023) Evaluating uncertainties to deliver enhanced service performance in education PPPs: A hierarchical reliability framework. Engineering, Construction and Architectural Management, 30(9), pp. 4464-4485. ISSN 0969-9988

George, K M (2019) Key performance indicators' effects on public sector infrastructure project efficiency in Grenada. DPA thesis, Walden University, USA.

Georgiadou, M C (2019) An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects. Construction Innovation, 19(3), pp. 298-320. ISSN 1471-4175

Georgiou, J; Smith, J and Love, P (2003) Building registration: Training and housing quality. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya. PhD thesis, Brunel University, UK.

Ghadiri, S T; Pazhouhanfar, M and Saberi, M (2026) Impact of architectural design characteristics of railway stations on travellers' preferences: A digital design method. Building Research & Information, 54(2), pp. 179-197. ISSN 0961-3218

Ghaffari, A (2013) Developing a mathematical model for profit sharing amongst partners in consulting engineering companies of construction projects. PhD thesis, Savitribai Phule Pune University, India, India.

Ghaffari, F; Shabak, M; Norouzi, N and Nayyeri Fallah, S (2023) Hospital salutogenic public spaces: A conceptual framework of effective perceptional environment quality components on patients' satisfaction. International Journal of Building Pathology and Adaptation, 41(5), pp. 965-987. ISSN 23984708

Ghaffari, M (2014) A detailed analysis of existing project success factors. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ghafoori, M (2023) Developing building maintenance and upgrade system (BMUS) to minimize operational cost of existing buildings within available budgets. PhD thesis, University of Colorado at Denver, USA.

Ghanbaripour, A. N.; Sher, W. and Yousefi, A. (2020) Critical success factors for subway construction projects–main contractors' perspectives. International Journal of Construction Management, 20(3), pp. 177-195. ISSN 1562-3599

Ghanbaripour, A N; Golmoradi, M; Langston, C; Skulmoski, G and Arqoub, M A (2022) The effect of project manager's management style on project delivery success in construction projects. International Journal of Construction Management, 22(15), pp. 2941-2950. ISSN 1562-3599

Ghanbaripour, A N; Langston, C; Tumpa, R J and Skulmoski, G (2024) Validating and testing a project delivery success model in construction: A mixed-method approach in Australia. Smart and Sustainable Built Environment, 13(3), pp. 532-559. ISSN 2046-6099

Ghanbaripour, A N; Langston, C and Yousefi, A (2017) Implementation of 3D integration model for project delivery success: Case study. Journal of Construction Engineering and Management, 143(8): 05017012, ISSN 0733-9364

Ghanbaripour, A N; Sher, W and Yousefi, A (2020) Critical success factors for subway construction projects: main contractors' perspectives. International Journal of Construction Management, 20(3), pp. 177-195. ISSN 1562-3599

Ghanbaripour, Amir (2020) Improving the project delivery success of Australian construction project management practice. PhD thesis, Bond University, Australia.

Ghansah, F A and Lu, W (2025) Cyber-physical systems and digital twins for "cognitive building" in the construction industry. Construction Innovation, 25(3), pp. 787-818. ISSN 1471-4175

Ghansah, F A; Owusu-Manu, D G; Edwards, D J; Thwala, W D; Yamoah Agyemang, D and Ababio, B K (2024) A framework for smart building technologies implementation in the Ghanaian construction industry: A PLS-SEM approach. Building Research & Information, 52(1-2), pp. 148-163. ISSN 0961-3218

Gharaibeh, L; Eriksson, K and Lantz, B (2025) Quantifying BIM investment value: A systematic review. Journal of Engineering, Design and Technology, 23(5), pp. 1384-1403. ISSN 1726-0531

Gharaibeh, L.; Lantz, B. and Eriksson, K. M. (2026) Bridging the gap: A framework for monetizing BIM by integrating industry insights for informed decision-making. Smart and Sustainable Built Environment, 15(2), pp. 710-728. ISSN 2046-6099

Gharaibeh, H M (2013) Managing the cost of power transmission projects: Lessons learned. Journal of Construction Engineering and Management, 139(8), pp. 1063-1067. ISSN 0733-9364

Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.

Gharouni Jafari, K and Noorzai, E (2021) Selecting the most appropriate project manager to improve the performance of the occupational groups in road construction projects in warm regions. Journal of Construction Engineering and Management, 147(10): 04021131, ISSN 0733-9364

Gharouni Jafari, K; Noorzai, E and Hosseini, M R (2021) Assessing the capabilities of computing features in addressing the most common issues in the AEC industry. Construction Innovation, 21(4), pp. 875-898. ISSN 1471-4175

Ghasemi Poor Sabet, Pejman (2020) A hybrid OSM–BIM framework for construction management system. PhD thesis, Curtin University, Australia.

Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.

Ghodoosi, F; Abu-Samra, S; Zeynalian, M and Zayed, T (2018) Maintenance cost optimization for bridge structures using system reliability analysis and genetic algorithms. Journal of Construction Engineering and Management, 144(2): 04017116, ISSN 0733-9364

Ghorbany, S; Yousefi, S and Noorzai, E (2024) Evaluating and optimizing performance of public-private partnership projects using copula Bayesian network. Engineering, Construction and Architectural Management, 31(1), pp. 290-323. ISSN 0969-9988

Ghosh, A (2015) Analyzing the impact of building information modeling (BIM) on labor productivity in retrofit construction: Case study at a semiconductor manufacturing facility. PhD thesis, Arizona State University, USA.

Ghosh, A; Abawajy, J and Chowdhury, M (2024) Redefining the construction managerial landscape to facilitate Industry 4.0 implementation: Scientometric mapping of research frontiers. Construction Innovation, 24(3), pp. 657-683. ISSN 1471-4175

Ghosh, B and Karmakar, S (2025) Development and application of a digitalized construction quality document management system for advanced construction using building information modeling. Journal of Construction Engineering and Management, 151(6): 04025053, ISSN 0733-9364

Ghosh, S; Dickerson, D E and Mills, T (2019) Effect of the Last Planner system® on social interactions among project participants. International Journal of Construction Education and Research, 15(2), pp. 100-117. ISSN 1557-8771

Ghosh, S and Robson, K F (2015) Analyzing the empire state building project from the perspective of lean delivery system: A descriptive case study. International Journal of Construction Education and Research, 11(4), pp. 257-267. ISSN 1557-8771

Gibbs, D. J.; Lord, W.; Emmitt, S. B. A. and Ruikar, K. (2015) BIM and construction contracts: Cpc 2013's approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 285-293. ISSN 1751-4304

Gibbs, D J; Lord, W; Emmitt, S B A and Ruikar, K (2015) BIM and construction contracts: CPC 2013’s approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 285-293. ISSN 17514304

Gidado, K (2000) Flowcharted model for information flow in design and build projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Gidado, K (2004) Enhancing the prime contractor's pre-construction planning. Journal of Construction Research, 5(1), pp. 87-106. ISSN 1609-9451

Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(2), pp. 52-68. ISSN 1358-9180

Giel, B K (2013) Framework for evaluating the BIM competencies of building owners. PhD thesis, University of Florida, USA.

Gielingh, W F (2005) Improving the performance of construction by the acquisition, organization and use of knowledge: A theory and method for cognitive engineering, construction and lifecycle management. PhD thesis, Delft University of Technology, Netherlands.

Gil, N and Tommelein, I D (2003) Using product and process flexibility to cope with project delivery uncertainty. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193

Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.

Gilani, G; Pons, O and De La Fuente, A (2022) Sustainability-oriented approach to assist decision makers in building facade management. Journal of Construction Engineering and Management, 148(1): 04021182, ISSN 0733-9364

Gilbert, Guinevere (2011) A sequential exploratory mixed methods evaluation of graduate training and development in the construction industry. PhD thesis, RMIT University, Australia.

Gilham, A (2010) A governance framework for sustainable development in the built environment. PhD thesis, De Montfort University, UK.

Gilham, A (2023) The relationship between customers’ satisfaction and trust in the global supply chain and profitability. DBA thesis, Walden University, USA.

Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364

Gill, Z M; Tierney, M J; Pegg, I M and Allan, N (2010) Low-energy dwellings: The contribution of behaviours to actual performance. Building Research & Information, 38(5), pp. 491-508. ISSN 0961-3218

Gillespie, D and McIlwaine, S (2021) Reducing embodied carbon in the construction sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Gilly, B A; Touran, A and Asai, T (1987) Quality control circles in construction. Journal of Construction Engineering and Management, 113(3), pp. 427-439. ISSN 0733-9364

Gilmour D, B D F R I J T A (2013) A knowledge map of sustainability for urban redevelopment projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ginigaddara, B; Gajendran, T and Beard, C (2025) A critical review of quantity surveying education in an offsite construction perspective: strategies for up-skilling. Construction Innovation, 25(4), pp. 1058-1084. ISSN 1471-4175

Giron Matute, W A (2018) Sustainability analysis for construction companies under the LEED code. PhD thesis, University of Alabama, USA.

Giustozzi, F (2012) Life cycle assessment of sustainable road pavements: Carbon footprinting and multi-attribute analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Givoni, B; Khedari, J; Wong, N H; Feriadi, H and Noguchi, M (2006) Thermal sensation responses in hot, humid climates: Effects of humidity. Building Research & Information, 34(5), pp. 496-506. ISSN 0961-3218

Gkritza, K (2006) Economic development effects of highway investment. PhD thesis, Purdue University, USA.

Glagola, C R (1993) A model of current quality performance measurements for industrial construction. PhD thesis, Clemson University, USA.

Glagola, C R and Sheedy, W M (2002) Partnering on defense contracts. Journal of Construction Engineering and Management, 128(2), pp. 127-138. ISSN 0733-9364

Glass, J (2005) A best practice process model for hybrid concrete construction. Construction Management and Economics, 23(2), pp. 169-184. ISSN 01446193

Glavan, J R (1988) Analysis of design-related problems from an industrial project. PhD thesis, University of Texas at Austin, USA.

Glavan, J R and Tucker, R L (1991) Forecasting design-related problems-case study. Journal of Construction Engineering and Management, 117(1), pp. 47-65. ISSN 0733-9364

Gledson, B (2015) Investigating the diffusion of 4D BIM innovation. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Gledson, B J (2016) Hybrid project delivery processes observed in constructor BIM innovation adoption. Construction Innovation, 16(2), pp. 229-246. ISSN 1471-4175

Gledson, B J and Greenwood, D (2014) The implementation and use of 4D BIM and virtual construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Gledson, B J and Greenwood, D (2017) The adoption of 4D BIM in the UK construction industry: An innovation diffusion approach. Engineering, Construction and Architectural Management, 24(6), pp. 950-967. ISSN 0969-9988

Godfrey Ochieng, E and Price, A D (2009) Framework for managing multicultural project teams. Engineering, Construction and Architectural Management, 16(6), pp. 527-543. ISSN 0969-9988

Goedert, J D and Meadati, P (2008) Integrating construction process documentation into building information modeling. Journal of Construction Engineering and Management, 134(7), pp. 509-516. ISSN 0733-9364

Goel, A; Ganesh, L S and Kaur, A (2020) Social sustainability considerations in construction project feasibility study: A stakeholder salience perspective. Engineering, Construction and Architectural Management, 27(7), pp. 1429-1459. ISSN 0969-9988

Goh, C S (2014) Development of a capability maturity model for sustainable construction. PhD thesis, University of Hong Kong, Hong Kong.

Goh, Kai Chen (2011) Developing financial decision support for highway infrastructure sustainability. PhD thesis, Queensland University of Technology, Australia.

Golparvar-Fard, M; Peña-Mora, F and Savarese, S (2011) Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. Journal of Construction Engineering and Management, 137(12), pp. 1099-1116. ISSN 0733-9364

Gomez Villanueva, Sulyn Cossett (2023) Behavior-based quality system (bbqs). PhD thesis, University of California, USA.

González, V; Alarcón, L F; Maturana, S; Mundaca, F and Bustamante, J (2010) Improving planning reliability and project performance using the reliable commitment model. Journal of Construction Engineering and Management, 136(10), pp. 1129-1139. ISSN 0733-9364

Good, Tammy L (2023) Manager performance on public construction projects: A descriptive analysis study. DBA thesis, Keiser University (Florida), USA.

Goodarzi, M (2021) A post-construction evaluation of long-term success in LEED-certified residential communities. PhD thesis, Michigan State University, USA.

Goonetillake, J F (2019) A framework for the integration of information requirements within infrastructure digital construction. PhD thesis, Cardiff University, UK.

Gordo-Gregorio, P; Alavi, H; Edwards, D J; Forcada, N and Guéna, F (2026) An occupant-centric approach on digital twins for building management. Building Research & Information, 54(1), pp. 59-78. ISSN 0961-3218

Gorse, C; Glew, D; Miles-Shenton, D and Farmer, D (2015) Addressing the thermal performance gap: Possible performance control tools for the construction manager. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Gorse, C; Stafford, A; Shenton, D M; Johnston, D; Sutton, R and Farmer, D (2012) Thermal performance of buildings and the management process. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Gorse, C A and Emmitt, S (2007) Communication behaviour during management and design team meetings: A comparison of group interaction. Construction Management and Economics, 25(11), pp. 1197-1213. ISSN 01446193

Gorse, C A; Emmitt, S and Lowis, M (1999) Problem solving and appropriate communication medium. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2002) Interaction characteristics of successful contractors' representatives. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Gosling, J; Naim, M; Towill, D; Abouarghoub, W and Moone, B (2015) Supplier development initiatives and their impact on the consistency of project performance. Construction Management and Economics, 33(5-6), pp. 390-403. ISSN 01446193

Gosling, J; Naim, M; Towill, D and Moone, B (2014) The impact of supplier development initiatives on key performance indicators. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Gotthelf, H; Ozbek, M E and Guggemos, A (2013) Potential efficiency gains from early involvement of steel fabricators and erectors: Lessons learned from the nrel research support facility project. International Journal of Construction Education and Research, 9(2), pp. 147-160. ISSN 1557-8771

Gottsche, J; Kelly, M and Taggart, M (2016) Assessing the impact of energy management initiatives on the energy usage during the construction phase of an educational building project in Ireland. Construction Management and Economics, 34(1), pp. 46-60. ISSN 01446193

Gould, C H (1988) Rolling fours: Novel work schedule. Journal of Construction Engineering and Management, 114(4), pp. 577-593. ISSN 0733-9364

Govender, N; Laryea, S and Watermeyer, R (2022) A framework for assessing quality of tender documents. Built Environment Project and Asset Management, 12(4), pp. 573-589. ISSN 2044-124X

Gowthami, N R; Sridhar, C N V and Venkata Ramana, N (2022) An empirical implementation model of total quality management in construction: Southern India. International Journal of Construction Management, 22(15), pp. 3023-3033. ISSN 1562-3599

Graham, D; Smith, S D and Tommelein, I D (2005) Cost of concrete placement for contractors. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, L T; Parkinson, T and Schiavon, S (2021) Lessons learned from 20 years of CBE's occupant surveys. Buildings & Cities, 2(1), pp. 166-184. ISSN 2632-6655

Graig, N (2007) The prevailing trends of defects and snagging in new homes in the UK. PhD thesis, Glasgow Caledonian University, UK.

Gransberg, D D; Karaca, I and Senadheera, S (2004) Calculating roller requirements for chip seal projects. Journal of Construction Engineering and Management, 130(3), pp. 378-384. ISSN 0733-9364

Gransberg, D D and Molenaar, K (2003) A synthesis of design-builder selection methods for public infrastructure projects. Journal of Construction Procurement, 9(2), pp. 40-51. ISSN 1358-9180

Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.

Grasso, B; Rasdorf, W and Bridgers, M (2008) Nature and extent of domestic construction program outsourcing. Journal of Construction Engineering and Management, 134(12), pp. 1002-1010. ISSN 0733-9364

Grau, D and Back, W E (2015) Predictability index: Novel metric to assess cost and schedule performance. Journal of Construction Engineering and Management, 141(12): 04015043, ISSN 0733-9364

Graves, C J (2020) Project managers positively influence knowledge sharing processes among team members within organizations. DBA thesis, Capella University, USA.

Gravina da Rocha, C; Korb, S and Sacks, R (2022) Work structuring and product design for customized repetitive projects. Construction Management and Economics, 40(7-8), pp. 526-547. ISSN 01446193

Gravitt, D D (2004) The development and validation of a bar code based residential construction quality inspection procedure. PhD thesis, Indiana State University, USA.

Greasley, K; Bryman, N K A; Dainty, A R J and Price, A D F (2003) Perceptions of empowerment by construction senior management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Green, S D and Sergeeva, N (2020) The contested privileging of zero carbon: Plausibility, persuasiveness and professionalism. Buildings & Cities, 1(1), pp. 491-503. ISSN 2632-6655

Greenwood, J P (2007) An examination of the performance based building code on the design of a commercial building. Construction Economics and Building, 7(1), pp. 37-44. ISSN 2204-9029

Gremyr, I; Bäckstrand, J; Fredriksson, A; Gatenholm, G and Halldórsson, Á (2023) Blueprinting construction logistics services for quality improvement. Construction Management and Economics, 41(1), pp. 60-78. ISSN 01446193

Griffin, G S (1996) Complexity theory in construction management. PhD thesis, Colorado State University, USA.

Griffith, A (1984) A critical investigation of factors influencing buildability and productivity. PhD thesis, Heriot-Watt University, UK.

Griffith, A (2000) Integrated management systems: A single management system solution for project control? Engineering, Construction and Architectural Management, 7(3), pp. 232-240. ISSN 0969-9988

Griffith, A and Bhutto, K (2008) Contractors' experiences of integrated management systems. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 93-98. ISSN 17514312

Griffith, A F (1997) Team alignment during pre-project planning of capital facilities. PhD thesis, University of Texas at Austin, USA.

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.

Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Grosse, H (2018) Conflicts and alternative solutions: How hostilities obstruct alternative solutions. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Grosse, H (2021) Developing teamwork skills: AEC students writing reflective journals and using action research. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Grosse, H (2023) Thrown into a construction dispute: The personal toll of aggressive claims management. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Grove, E; Dainty, A; Thomson, D and Thorpe, T (2018) Becoming collaborative: A study of intra-organisational relational dynamics. Journal of Financial Management of Property and Construction, 23(1), pp. 6-23. ISSN 1366-4387

Gruneberg, S (2013) Strategy framework for post-construction contractor services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Gruneberg, S and Murdoch, I (2011) Specialist contractors' views: Testing the NSCC State of Trade Quarterly Report results against market conditions. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gu, T; Hao, E; Dirks, K; Kieu, M and Zhang, R (2026) Enhancing residents' satisfaction in old community renewal: Application and validation of an extended expectation-disconfirmation theory model. Journal of Construction Engineering and Management, 152(4): 04026023, ISSN 0733-9364

Guerra, B C; Koo, H J; Caldas, C and Leite, F (2024) Prediction of waste diversion and identification of trends in construction and demolition waste data using data mining. International Journal of Construction Management, 24(4), pp. 374-383. ISSN 1562-3599

Guerra, Beatriz Chinelato (2021) BIM-based construction waste management and circular economy for resource recovery. PhD thesis, University of Texas at Austin, USA.

Guggemos, A A (2003) Environmental impacts of on-site construction processes: Focus on structural frames. PhD thesis, University of California, Berkeley, USA.

Guha, P; Kar, S and Jha, K N (2025) Exploring leadership styles and their effect on the safety and quality performances in construction projects. Journal of Construction Engineering and Management, 151(9): 04025120, ISSN 0733-9364

Guha, P; Kar, S and Jha, K N (2025) Impact of construction leaders' emotional quotient on project safety and quality. Journal of Construction Engineering and Management, 151(10): 04025157, ISSN 0733-9364

Gulati, Richa (2021) Necessity of soft skills for project managers and the contribution to project success. PhD thesis, University of Adelaide, Australia.

Gultekin-Bicer, P; Anumba, C J and Leicht, R M (2018) Advanced energy retrofit projects: Cross-case analysis of integrated system design. International Journal of Construction Management, 18(6), pp. 453-466. ISSN 1562-3599

Gumusburun Ayalp, G and Ay, I (2021) Model validation of factors limiting the use of prefabricated construction systems in Turkey. Engineering, Construction and Architectural Management, 28(9), pp. 2610-2636. ISSN 0969-9988

Gunarathna, C; Yang, R J; Jayasuriya, S; Yi, X; Arashpour, M; Ning, X and Heng, X (2026) Design and development of blockchain-enabled information management system for building integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(15), pp. 72-114. ISSN 0969-9988

Gunathilaka, S (2025) Enabling team resilience against calamities through sensemaking in global construction engineering projects. Construction Economics and Building, 25(3-4), pp. 163-185. ISSN 2204-9029

Gunathilaka, S; Wijesekara, D and Kwok, S F (2025) Project high-performance work system for enabling high-performing teams in construction. Construction Economics and Building, 25(3-4), pp. 43-64. ISSN 2204-9029

Gunatilake, S (2013) The uptake and implementation of sustainable construction: transforming policy into practice. PhD thesis, University of Central Lancashire, UK.

Gunduz, M; Abumoza, A M and Aly, A A (2023) A structural equation model to assess the effects of strategic and project related potential risks on project delivery in qatar. Engineering, Construction and Architectural Management, 30(10), pp. 4782-4820. ISSN 0969-9988

Gunduz, M and Al-Naimi, N H (2022) Construction projects delay mitigation using integrated balanced scorecard and quality function deployment. Engineering, Construction and Architectural Management, 29(5), pp. 2073-2105. ISSN 0969-9988

Gunduz, M and Elsherbeny, H A (2020) Critical assessment of construction contract administration using fuzzy structural equation modeling. Engineering, Construction and Architectural Management, 27(6), pp. 1233-1255. ISSN 0969-9988

Gunduz, M and Elsherbeny, H A (2021) Critical assessment of contract administration using multidimensional fuzzy logic approach. Journal of Construction Engineering and Management, 147(2): 04020162, ISSN 0733-9364

Gunduz, M; Naji, K and Maki, O (2025) A framework for evaluating campus facility management performance in light of project critical success factors using a multidimensional fuzzy logic approach. Engineering, Construction and Architectural Management, 32(3), pp. 1715-1738. ISSN 0969-9988

Gunduz, M; Sirin, O and Al Nawaiseh, H M (2024) Assessment of critical project success factors for management of pavement construction using the Delphi approach. Journal of Construction Engineering and Management, 150(4): 04024020, ISSN 0733-9364

Gunning, J G (2000) Models of customer satisfaction and service quality as research instruments in construction management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Gunning, J G (2003) The enhancement of quality in construction project management. PhD thesis, Ulster University, UK.

Gunning, J G (2004) An analysis of the impact of the revised: Bs en ISO 9001:2000 upon the ready mixed concrete industry of the United Kingdom. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gunning, J G (2008) Towards a more playful approach to construction management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Gunning, J G and Cooke, E (1996) The influence of occupational stress on construction professionals. Building Research & Information, 24(4), pp. 213-221. ISSN 0961-3218

Guo, Z.; Wang, Q.; Jing, H. and Gao, Q. (2026) How to promote the technological innovation cooperation in mega construction projects at the project level? Engineering, Construction and Architectural Management, 33(5), pp. 3657-3681. ISSN 0969-9988

Guo, F; Jahren, C T; Hao, J and Zhang, C (2020) Implementation of CIM-related technologies within transportation projects. International Journal of Construction Management, 20(5), pp. 510-519. ISSN 1562-3599

Guo, F; Jahren, C T and Turkan, Y (2021) Electronic document management systems for the transportation construction industry. International Journal of Construction Education and Research, 17(1), pp. 52-67. ISSN 1557-8771

Guo, S (2025) Optimizing profit distribution in IPD projects: A fuzzy cooperative game approach to address resource-based input uncertainty. Journal of Construction Engineering and Management, 151(9): 04025118, ISSN 0733-9364

Guo, X; Wu, H; Chen, Y; Chang, Y and Ao, Y (2023) Gauging the impact of personal lifestyle, indoor environmental quality and work-related factors on occupant productivity when working from home. Engineering, Construction and Architectural Management, 30(8), pp. 3713-3730. ISSN 0969-9988

Guo, Z; Xu, X; Gao, X; Xu, Y; Liu, J; Zhang, M and Li, F (2025) Enhanced risk-based quality control for hydraulic engineering construction projects considering the risk-influencing mechanism. Journal of Construction Engineering and Management, 151(2): 04024204, ISSN 0733-9364

Gupta, A (2013) Developing a BIM-based methodology to support renewable energy assessment of buildings. PhD thesis, Cardiff University, UK.

Gupta, P and Elhag, T (2025) Applicability of lean techniques and processes on improving sustainability in construction projects. Built Environment Project and Asset Management, 15(2), pp. 247-270. ISSN 2044-124X

Gupta, R and Chandiwala, S (2010) Understanding occupants: Feedback techniques for large-scale low-carbon domestic refurbishments. Building Research & Information, 38(5), pp. 530-548. ISSN 0961-3218

Gupta, R; Gregg, M and Cherian, R (2020) Developing a new framework to bring consistency and flexibility in evaluating actual building performance. International Journal of Building Pathology and Adaptation, 38(1), pp. 228-255. ISSN 23984708

Guribie, F L; Owusu-Manu, D G; Badu, E and Edwards, D J (2023) Fuzzy synthetic evaluation of the systemic obstacles to personalizing knowledge flows within and across projects. Construction Innovation, 23(3), pp. 546-566. ISSN 1471-4175

Gurmu, A.; Galluzzo, A. and Kite, J. (2021) Modelling customers' perception of the quality of services provided by builders: A case of Victoria, Australia. Construction Economics and Building, 21(1), pp. 100-124. ISSN 2204-9029

Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.

Guthrie, J L (2000) Group-level reengineering process. EngD thesis, University of Kansas, USA.

Gutierres, Henrique Elias Pessoa (2019) Methodological proposal for the evaluation of geomorphological impacts based on the environmental impact studies of the Serro Azul and Igarapeba dams in the state of Pernambuco. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Gutierrez-Bucheli, L.; Muñoz, S.; Couper, R. and Maxwell, D. W. (2026) Mapping the landscape of productivity in construction research: An umbrella review of trends, gaps and future directions. Engineering, Construction and Architectural Management, 33(15), pp. 516-539. ISSN 0969-9988

Gyadu-Asiedu, W (2009) Assessing construction project performance in Ghana: modelling practitioners' and clients perspectives. PhD thesis, Eindhoven University of Technology, Netherlands.

Görsch, C; Seppänen, O; Peltokorpi, A and Lavikka, R (2024) Task planning and control in construction: Revealing workers as early and late planners. Construction Management and Economics, 42(5), pp. 431-450. ISSN 01446193

Görsch, Christopher (2024) Learning to see flow: A worker-centric exploration towards task planning and control in construction. DSc thesis, Aalto University, Finland.

Götz, C S; Karlsson, P and Yitmen, I (2022) Exploring applicability, interoperability and integrability of blockchain-based digital twins for asset life cycle management. Smart and Sustainable Built Environment, 11(3), pp. 532-558. ISSN 2046-6099

Ha, S K; Jang, J G; Park, S H and Lee, H K (2015) Advanced spray multiple layup process for quality control of sprayed FRP composites used to retrofit concrete structures. Journal of Construction Engineering and Management, 141(1): 04014060, ISSN 0733-9364

Haass, Omid (2018) Resilience and emergence in contemporary project evaluation: An epic battle between professional and political logics. PhD thesis, Griffith University, Brazil.

Habib, M and Spang, K (2014) Alternative project delivery systems for transport infrastructure in Germany. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Habib, S N H A (2017) Critical success factors and contractual risks for Private Finance 2 (PF2) projects implementing building information modelling (BIM). PhD thesis, University of Salford, UK.

Hackett, V (2017) The impact of a collaborative planning approach on engineering construction performance. PhD thesis, Nottingham Trent University, UK.

Haddad, A N; Silva, A B; Hammad, A W A; Najjar, M K; Vazquez, E G and Tam, V W Y (2023) An integrated approach of building information modelling and life cycle assessment (BIM-LCA) for gas and solar water heating systems. International Journal of Construction Management, 23(14), pp. 2452-2468. ISSN 1562-3599

Hadidi, L; Assaf, S; Aluwfi, K and Akrawi, H (2017) The effect of ISO 9001 implementation on the customer satisfaction of the engineering design services. International Journal of Building Pathology and Adaptation, 35(2), pp. 176-190.

Hadidi, L A (2016) Using quality function deployment to conduct assessment for engineering designs' contractors. Architectural Engineering and Design Management, 12(3), pp. 205-230. ISSN 1745-2007

Hadipriono, F C; Lim, C L and Wong, K H (1986) Event tree analysis to prevent failures in temporary structures. Journal of Construction Engineering and Management, 112(4), pp. 500-513. ISSN 0733-9364

Hadipriono, F C and Wang, H K (1986) Analysis of causes of falsework failures in concrete structures. Journal of Construction Engineering and Management, 112(1), pp. 112-121. ISSN 0733-9364

Hadizade, S. (2026) Components of children's hospital architecture from the perspective of staff: A mixed-method case study from Iran. Architectural Engineering and Design Management, 22(2), pp. 295-307. ISSN 1745-2007

Hagan, G; Bower, D and Smith, N (2011) Managing complex projects in multi-project environments. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Hagan, G N (2013) Managing complex construction projects in it multiproject environment by the contractor. PhD thesis, University of Leeds, UK.

Hague, D J (1985) Incentives and motivation in the construction industry: A critique. Construction Management and Economics, 3(2), pp. 163-170. ISSN 01446193

Haidar, A (2011) Analysis and optimization of megaproject performance. PhD thesis, University of Florida, USA.

Hailemarkos, H T (2020) Ethiopian construction project management maturity model determination and correlational prediction of project success. PhD thesis, Walden University, USA.

Hajarolasvadi, H and Shahhosseini, V (2022) Assignment of engineers to constructions project teams based on person-team fit. International Journal of Construction Management, 22(15), pp. 2895-2904. ISSN 1562-3599

Haji Karimian, S; Mbachu, J; Egbelakin, T and Shahzad, W (2019) Improving efficiency in roading projects: A New Zealand study. Engineering, Construction and Architectural Management, 26(5), pp. 827-849. ISSN 0969-9988

Haji-Metussin, Haji-Abdul Manaf (2000) Organisational changes related to the adoption of ISO 9000 and their significance for the pursuit of total quality management: A study of the process of ISO 9000 adoption in Brunei darussalam construction related industry. PhD thesis, University of Kent, UK.

Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.

Hajifathalian, K; Wambeke, B W; Liu, M and Hsiang, S M (2012) Effects of production control strategy and duration variance on productivity and work in process: Simulation-based investigation. Journal of Construction Engineering and Management, 138(9), pp. 1035-1043. ISSN 0733-9364

Hajikazemi, S.; Duryan, M.; Smyth, H.; Yuan, F. and Liu, C. (2026) Exploring mindfulness as a tool for recognition and prevention of burnout in construction and engineering. Engineering, Construction and Architectural Management, 33(7), pp. 5675-5694. ISSN 0969-9988

Hakkarainen, T E (2002) Studies on fire safety assessment of construction products. DSc(Tech) thesis, Tampereen Teknillinen Korkeakoulu, Finland.

Halaweh, M M (2012) System management of construction projects based on industrial engineering prespective with impact on net profit. PhD thesis, State University of New York at Binghamton, USA.

Hale, D R; Shrestha, P P; Gibson, G E and Migliaccio, G C (2009) Empirical comparison of design/build and design/bid/build project delivery methods. Journal of Construction Engineering and Management, 135(7), pp. 579-587. ISSN 0733-9364

Halfawy, M M R (1998) A multi-agent collaborative framework for concurrent design of constructed facilities. PhD thesis, Ohio State University, USA.

Hall, D M (2017) The early stages of integrated project delivery: Institutionalization and impact on adoption of systemic innovations. PhD thesis, Stanford University, USA.

Hallowell, M and Toole, T M (2009) Contemporary design-bid-build model. Journal of Construction Engineering and Management, 135(6), pp. 540-549. ISSN 0733-9364

Hallowell, M R; Hinze, J W; Baud, K C and Wehle, A (2013) Proactive construction safety control: Measuring, monitoring, and responding to safety leading indicators. Journal of Construction Engineering and Management, 139(10): 04013010, ISSN 0733-9364

Haltenhoff, C E (1987) Construction management performance under dual services agreements. Journal of Construction Engineering and Management, 113(4), pp. 640-647. ISSN 0733-9364

Hamani, K (2019) Developing a corporate sustainability performance evaluation model of the UAE construction contractors. PhD thesis, Heriot-Watt University, UK.

Hamdi, I M (1996) Multimedia applications in construction project management: An owner's perspective. PhD thesis, University of Kentucky, USA.

Hamerski, D C; Formoso, C T and Isatto, E L (2025) Integrating lean production and agile project management: A planning and control model for multi-project environments in construction. International Journal of Construction Management, 25(12), pp. 1432-1441. ISSN 1562-3599

Hamerski, D C; Tarcisio Abreu, S; Carlos Torres, F and Isatto, E L (2024) The contributions of the last planner system to resilient performance in construction projects. Construction Management and Economics, 42(4), pp. 328-345. ISSN 01446193

Hamida, M B and Hassanain, M A (2022) A framework model for AEC/FM knowledge in adaptive reuse projects. Journal of Engineering, Design and Technology, 20(3), pp. 624-648. ISSN 1726-0531

Hamilton-MacLaren, F; Loveday, D and Mourshed, M (2009) The calculation of embodied energy in new build UK housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Hamma-Adama, M (2020) Framework for macro building information modelling (BIM) adoption in Nigeria. PhD thesis, Robert Gordon University, UK.

Hampson, K; Peters, R; Walker, D and Tucker, S (2000) Project alliancing and information technology in building construction: The national museum of Australia. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hamzeh, F; Rached, F; Hraoui, Y; Karam, A J; Malaeb, Z; El Asmar, M and Abbas, Y (2019) Integrated project delivery as an enabler for collaboration: A middle East perspective. Built Environment Project and Asset Management, 9(3), pp. 334-347. ISSN 2044-124X

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Hamzeh, F R; El Samad, G and Emdanat, S (2019) Advanced metrics for construction planning. Journal of Construction Engineering and Management, 145(11): 04019063, ISSN 0733-9364

Han, F (2021) Measurement of resilience performance for infrastructure construction project delivery. PhD thesis, University of New Mexico, USA.

Han, F and Bogus, S M (2021) Resilience criteria for project delivery processes: An exploratory analysis for highway project development. Journal of Construction Engineering and Management, 147(11): 04021140, ISSN 0733-9364

Han, J; Gu, F and Wu, G (2023) Managing cooperation in multipartner project teams with heterogeneous team members. Journal of Construction Engineering and Management, 149(10): 04023101, ISSN 0733-9364

Han, J; Rapoport, A and Fong, P S W (2020) Incentive structures in multi-partner project teams. Engineering, Construction and Architectural Management, 27(1), pp. 49-65. ISSN 0969-9988

Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364

Han, S-H (2004) A working prototype of distributed collaborative architectural design system. PhD thesis, University of Michigan, USA.

Han, Y; Li, Y; Taylor, J E and Zhong, J (2018) Characteristics and evolution of innovative collaboration networks in architecture, engineering, and construction: Study of national prize-winning projects in China. Journal of Construction Engineering and Management, 144(6): 04018038, ISSN 0733-9364

Hanc, M; McAndrew, C and Ucci, M (2019) Conceptual approaches to wellbeing in buildings: A scoping review. Building Research & Information, 47(6), pp. 767-783. ISSN 0961-3218

Haniff, A P and Kaka, A P (2001) A framework for development of a knowledge database for use within the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hanioglu, M N and Arditi, D (2013) Teaming/timing sequences in hotel development projects. Construction Management and Economics, 31(4), pp. 369-385. ISSN 1466433X

Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364

Hanna, A S (2016) Benchmark performance metrics for integrated project delivery. Journal of Construction Engineering and Management, 142(9): 04016040, ISSN 0733-9364

Hanna, A S; Mikhail, G and Iskandar, K A (2017) State of prefab practice in the electrical construction industry: Qualitative assessment. Journal of Construction Engineering and Management, 143(2): 04016097, ISSN 0733-9364

Hanna, A S; Tadt, E J and Whited, G C (2012) Request for information: Benchmarks and metrics for major highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1347-1352. ISSN 0733-9364

Hanna Jr., H M (1988) The use of construction management in school building construction. EdD thesis, University of Missouri - Columbia, USA.

Haponava, T and Al-Jibouri, S (2010) Influence of process performance during the construction stage on achieving end-project goals. Construction Management and Economics, 28(8), pp. 853-869. ISSN 1466433X

Hardison, D C (2018) Hazard recognition in design: Evaluating the effects of design information on hazard recognition performance. PhD thesis, University of Colorado at Boulder, USA.

Hare, B and Cameron, I (2012) Health and safety gateways for construction project planning. Engineering, Construction and Architectural Management, 19(2), pp. 192-204. ISSN 0969-9988

Hare, B; Cameron, I and Roy Duff, A (2006) Exploring the integration of health and safety with pre-construction planning. Engineering, Construction and Architectural Management, 13(5), pp. 438-450. ISSN 0969-9988

Haroglu, H (2010) Investigating the structural frame decision making process. EngD thesis, Loughborough University, UK.

Haronian, E and Sacks, R (2021) Production control in earthworks: Concepts and metrics. Journal of Construction Engineering and Management, 147(10): 04021127, ISSN 0733-9364

Harper, C M (2014) Measuring project integration using relational contract theory. PhD thesis, University of Colorado at Boulder, USA.

Harper, C M; Molenaar, K R and Cannon, J P (2016) Measuring constructs of relational contracting in construction projects: The owner's perspective. Journal of Construction Engineering and Management, 142(10): 04016053, ISSN 0733-9364

Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364

Harrison, B W (1982) Socially responsive professional behavior of architectural firms: A social psychological perspective. PhD thesis, University of Michigan, USA.

Harrop, J N (2018) Sustainability, awareness and the built environment. PhD thesis, Cranfield University, UK.

Hartman, F T (1993) Construction dispute reduction through an improved contracting process in the Canadian context. PhD thesis, Loughborough University, UK.

Hartmann, A and Hietbrink, M (2013) An exploratory study on the relationship between stakeholder expectations, experiences and satisfaction in road maintenance. Construction Management and Economics, 31(4), pp. 345-358. ISSN 1466433X

Hartmann, T (2008) A grassroots model of decision support system implementations by construction project teams. PhD thesis, Stanford University, USA.

Hartmann, T (2011) Goal and process alignment during the implementation of decision support systems by project teams. Journal of Construction Engineering and Management, 137(12), pp. 1134-1141. ISSN 0733-9364

Hartmann, T and Fischer, M (2007) Supporting the constructability review with 3D/4D models. Building Research & Information, 35(1), pp. 70-80. ISSN 0961-3218

Hartmann, T; Gao, J and Fischer, M (2008) Areas of application for 3D and 4D models on construction projects. Journal of Construction Engineering and Management, 134(10), pp. 776-785. ISSN 0733-9364

Hartmann, T and Levitt, R E (2010) Understanding and managing three-dimensional/four-dimensional model implementations at the project team level. Journal of Construction Engineering and Management, 136(7), pp. 757-767. ISSN 0733-9364

Hartog, L; Weijs-Perrée, M and Appel-Meulenbroek, R (2018) The influence of personality on user satisfaction: Multi-tenant offices. Building Research & Information, 46(4), pp. 402-416. ISSN 0961-3218

Hartwell, J C; Upadhyay, Y and Sourani, A (2019) Influential factors of life cycle management in education PFI projects. Built Environment Project and Asset Management, 9(2), pp. 302-314. ISSN 2044-124X

Harun, Z B (1993) Computer simulation in decision support systems for management of construction projects. PhD thesis, University of Leeds, UK.

Harvey, E (2019) Rethinking construction safety. PhD thesis, Loughborough University, UK.

Hasan, S and Sacks, R (2023) Integrating BIM and multiple construction monitoring technologies for acquisition of project status information. Journal of Construction Engineering and Management, 149(7): 04023051, ISSN 0733-9364

Hasanain, F A (2022) A BIM-Mostadam plug-in design and evaluation model. PhD thesis, University of Florida, USA.

Hasanzade, M P; van Oel, C J and Pazhouhanfar, M (2023) Passengers' preferences for architectural design characteristics in the design of airport terminals. Architectural Engineering and Design Management, 19(6), pp. 586-601. ISSN 1745-2007

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.

Hassan, M (2010) Evaluation of the environmental and economic impacts of warm-mix asphalt using life-cycle assessment. International Journal of Construction Education and Research, 6(3), pp. 238-250. ISSN 1557-8771

Hassan, M E (2013) Assessing the impact of lean/integrated project delivery system on final project success. PhD thesis, George Mason University, USA.

Hassanain, M A (2007) Post-occupancy indoor environmental quality evaluation of student housing facilities. Architectural Engineering and Design Management, 3(4), pp. 249-256. ISSN 1745-2007

Hassanain, M A; Al-Zahrani, M; Abdallah, A and Sayed, A M Z (2019) Assessment of factors affecting maintenance cost of public school facilities. International Journal of Building Pathology and Adaptation, 37(5), pp. 528-546. ISSN 23984708

Hassanain, M A; Mathar, H and Aker, A (2016) Post-occupancy evaluation of a university student cafeteria. Architectural Engineering and Design Management, 12(1), pp. 67-77. ISSN 1745-2007

Hassanain, M A; Sanni-Anibire, M O and Mahmoud, A S (2023) Design quality assessment of campus facilities through post occupancy evaluation. International Journal of Building Pathology and Adaptation, 41(4), pp. 693-712. ISSN 23984708

Hassanain, M A; Sanni-Anibire, M O and Mahmoud, A S (2024) An assessment of users' satisfaction with a smart building on university campus through post-occupancy evaluation. Journal of Engineering, Design and Technology, 22(4), pp. 1119-1135. ISSN 1726-0531

Hassanain, M A; Sanni-Anibire, M O; Mahmoud, A S and Ahmed, W (2020) Post-occupancy evaluation of research and academic laboratory facilities. International Journal of Building Pathology and Adaptation, 38(5), pp. 797-810. ISSN 23984708

Hassanain, M A; Sanni-Anibire, M O; Mahmoud, A S and Hamida, M B (2020) Design guidelines for the functional efficiency of laboratory facilities. Architectural Engineering and Design Management, 16(2), pp. 115-130. ISSN 1745-2007

Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2007) Project manager's decision aid for a radical project cycle reduction. Journal of Construction Engineering and Management, 133(6), pp. 437-446. ISSN 0733-9364

Hauck, A J; Walker, D H T; Hampson, K D and Peters, R J (2004) Project alliancing at national museum of Australia: collaborative process. Journal of Construction Engineering and Management, 130(1), pp. 143-152. ISSN 0733-9364

Hawkey, Barry (2024) Qualitative comparative analysis of software development practices translated from scene to screen using the real-to-real method for inter-industry learning. PhD thesis, Colorado State University, USA.

He, C; Liu, M; Alves, T D C L; Scala, N M and Hsiang, S M (2022) Prioritizing collaborative scheduling practices based on their impact on project performance. Construction Management and Economics, 40(7-8), pp. 618-637. ISSN 01446193

He, Q; Wang, T; Chan, A P C and Xu, J (2021) Developing a list of key performance indictors for benchmarking the success of construction megaprojects. Journal of Construction Engineering and Management, 147(2): 04020164, ISSN 0733-9364

He, W; Tang, W; Wei, Y; Duffield, C F and Lei, Z (2016) Evaluation of cooperation during project delivery: Empirical study on the hydropower industry in southwest China. Journal of Construction Engineering and Management, 142(2): 04015068, ISSN 0733-9364

Heaton, J (2020) Development of asset information requirements to support asset management. PhD thesis, University of Cambridge, UK.

Heaton, R; Martin, H; Chadee, A; Milling, A; Dunne, S and Borthwick, F (2022) The construction materials conundrum: Practical solutions to address integrated supply chain complexities. Journal of Construction Engineering and Management, 148(8): 04022071, ISSN 0733-9364

Hecht, H R (2001) Development of major transportation projects in California. PhD thesis, University of California, Davis, USA.

Heesom, D; Boden, P; Hatfield, A; Rooble, S; Andrews, K and Berwari, H (2021) Developing a collaborative HBIM to integrate tangible and intangible cultural heritage. International Journal of Building Pathology and Adaptation, 39(1), pp. 72-95. ISSN 23984708

Hefer, A L R (2019) Optimising construction project role-player performance. PhD thesis, Nelson Mandela University, South Africa.

Heidemann, A and Gehbauer, F (2011) The way towards cooperative project delivery. Journal of Financial Management of Property and Construction, 16(1), pp. 19-30. ISSN 1366-4387

Heidrich, O; Kamara, J; Maltese, S; Re Cecconi, F and Dejaco, M C (2017) A critical review of the developments in building adaptability. International Journal of Building Pathology and Adaptation, 35(4), pp. 284-303.

Hein, M F and Houck, K D (2008) Construction challenges of adaptive reuse of historical buildings in Europe. International Journal of Construction Education and Research, 4(2), pp. 115-131. ISSN 1557-8771

Helen, C L; Francis, V and Turner, M (2010) The rhythms of project life: A longitudinal analysis of work hours and work-life experiences in construction. Construction Management and Economics, 28(10), pp. 1085-1098. ISSN 1466433X

Hellwig, R T (2015) Perceived control in indoor environments: A conceptual approach. Building Research & Information, 43(3), pp. 302-315. ISSN 0961-3218

Hemphill, L M (2009) Building bridges: A study of coordination in projects. PhD thesis, University of Michigan, USA.

Henderson, J R (2013) Enhancing buildability through improving design-construction feedback loops within complex projects. PhD thesis, Loughborough University, UK.

Henderson, J R; Ruikar, K and Dainty, A R J (2010) The need for embedding 'learning' in healthcare projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects. PhD thesis, University of the West of England, Bristol, UK.

Henjewele, C; Sun, M and Fewings, P (2011) Value for money optimisation and sustainability in PFI projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Henrich, G (2010) Development of a tool for diagnosing production management efficiency on construction sites. PhD thesis, University of Salford, UK.

Heravi Torbati, Amir Hossein (2014) Improving construction management: An investigation into the influences of effective stakeholder involvement on project quality outcomes. PhD thesis, Queensland University of Technology, Australia.

Herbert, M (2000) Performance and the virtual team. PhD thesis, Loughborough University, UK.

Heredia Rojas, Boris Fabrizio (2017) The contingent effects of value creation processes on project value: An empirical analysis from project managers' perspective. PhD thesis, University of Sydney, Australia.

Heredia-Rojas, B; Liu, L and Taborda, L (2015) Relational approach of value creation for construction project delivery: A conceptual framework. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Herman, S S (2016) The motivation of quantity surveyors in the Malaysian construction industry for improved job performance. PhD thesis, University of Salford, UK.

Hernandez, W (2017) Development of a sustainable quality assurance program for transporation infrastructure. PhD thesis, University of Rhode Island, USA.

Herrera, R F; Mourgues, C; Alarcón, L F and Pellicer, E (2020) Understanding interactions between design team members of construction projects using social network analysis. Journal of Construction Engineering and Management, 146(6): 04020053, ISSN 0733-9364

Herrera, R F; Mourgues, C; Alarcón, L F and Pellicer, E (2021) Analyzing the association between lean design management practices and BIM uses in the design of construction projects. Journal of Construction Engineering and Management, 147(4): 04021010, ISSN 0733-9364

Hidayat, B (2013) The role of knowledge communication in the effective management of post-disaster reconstruction projects in Indonesia. PhD thesis, University of Salford, UK.

Higham, A and Fortune, C (2011) Sustainable asset management (SAM) decision making: An exploration of current practice. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Higham, A and Stephenson, P (2014) Identifying project success criteria for UK social housing asset management schemes. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Higuera-Trujillo, J L; Llinares Millán, C; Montañana i Aviñó, A and Rojas, J C (2020) Multisensory stress reduction: A neuro-architecture study of paediatric waiting rooms. Building Research & Information, 48(3), pp. 269-285. ISSN 0961-3218

Hijazi, A A; Perera, S; Calheiros, R N and Alashwal, A (2023) A data model for integrating BIM and blockchain to enable a single source of truth for the construction supply chain data delivery. Engineering, Construction and Architectural Management, 30(10), pp. 4645-4664. ISSN 0969-9988

Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Hiley, A and Gopsill, G (2000) The implementation of value management as a design management tool in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hiley, A and Yagci, O (2001) The implementation of constructability: A prerequisite in raising the quality of project outcome. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Hillestad, D (2022) Building owners and managers organizational maturity self-assessment for a facility condition assessment program. PhD thesis, Arizona State University, USA.

Hilu, K A and Hiyassat, M A (2024) Qualitative assessment of resilience in construction projects. Construction Innovation, 24(5), pp. 1297-1319. ISSN 1471-4175

Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.

Hirbod, S (2018) The application of EnerPHit standard to residential tower blocks in the UK. PhD thesis, University of Kent, UK.

Hiyasat, R; Sosa, M and Ahmad, L (2023) Use of work-space at home under COVID-19 conditions in the UAE. Engineering, Construction and Architectural Management, 30(8), pp. 3142-3159. ISSN 0969-9988

Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains. PhD thesis, University of Washington, USA.

Ho, M F; Drew, D; McGeorge, D and Loosemore, M (2004) Implementing corporate ethics management and its comparison with the safety management system: A case study in Hong Kong. Construction Management and Economics, 22(6), pp. 595-606. ISSN 01446193

Ho, Man Fong Christabel (2003) Ethics management in a construction organisation: Employees' attitudes to corporate codes of ethics. PhD thesis, University of New South Wales, Australia.

Hochscheid, E; Falardeau, M; Lapalme, J; Boton, C and Rivest, L (2023) Practitioners' concerns about their liability toward BIM collaborative digital mockups: Case study in civil engineering. Journal of Construction Engineering and Management, 149(9): 05023010, ISSN 0733-9364

Hochstatter, Kirk (2025) Collaborative project delivery governance and shared leadership in AEC building virtual teams. PhD thesis, University of Washington, USA.

Hofsteede, Iraina (2019) The influence of leadership competencies on the outcome of tendering projects. PhD thesis, RMIT University, Australia.

Hojem, T S M; Sørensen, K H and Lagesen, V A (2014) Designing a green building: Expanding ambitions through social learning. Building Research & Information, 42(5), pp. 591-601. ISSN 0961-3218

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.

Holley, P W (2016) Learning styles and preferences of field managers in U.S. non-residential construction. PhD thesis, Auburn University, USA.

Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.

Homayouni, H (2015) Aligning contractual, technological, and organizational elements to achieve higher performance buildings: A qualitative comparative analysis approach. PhD thesis, University of Washington, USA.

Hong, J (2006) A study on analytic approaches to intelligent buildings assessment. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364

Hong, Y; Xie, H; Agapaki, E and Brilakis, I (2023) Graph-based automated construction scheduling without the use of BIM. Journal of Construction Engineering and Management, 149(2): 05022020, ISSN 0733-9364

Hong, Z; Hong, Y; Cai, H; Abraham, D M; Zhang, J and Dunston, P S (2025) BIM-based framework for in-plant quality control of precast concrete manufacturing. Journal of Construction Engineering and Management, 151(12): 05025017, ISSN 0733-9364

Hoque, M I; Safayet, M A; Rana, M J; Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(2), pp. 401-421. ISSN 23984708

Horii, T (2005) Impact of multiple normative systems on the organizational performance of international joint ventures. PhD thesis, Stanford University, USA.

Horner, M and Zakieh, R (1996) Characteristic items: a new approach to pricing and controlling construction projects. Construction Management and Economics, 14(3), pp. 241-252. ISSN 01446193

Horta, I M; Camanho, A S and Da Costa, J M (2010) Performance assessment of construction companies integrating key performance indicators and data envelopment analysis. Journal of Construction Engineering and Management, 136(5), pp. 581-594. ISSN 0733-9364

Horta, I M; Camanho, A S and Lima, A F (2013) Design of performance assessment system for selection of contractors in construction industry e-marketplaces. Journal of Construction Engineering and Management, 139(8), pp. 910-917. ISSN 0733-9364

Hossain, M K (2015) Investigating the relationship between the culture of construction project-based organisations and the implementation of building information modelling. PhD thesis, University of Dundee, UK.

Hossain, M M and Ahmed, S (2022) Developing an automated safety checking system using BIM: A case study in the Bangladeshi construction industry. International Journal of Construction Management, 22(7), pp. 1206-1224. ISSN 1562-3599

Hosseini, A.; Niknam, M.; Shafaat, A. and Fathi, A. (2026) A unified ontology framework for cross-domain integration of BIM, IoT, and maintenance services in smart facility management. Engineering, Construction and Architectural Management, 33(3), pp. 1784-1812. ISSN 0969-9988

Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.

Hosseini, M R; Bosch-Sijtsema, P; Arashpour, M; Chileshe, N and Merschbrock, C (2018) A qualitative investigation of perceived impacts of virtuality on effectiveness of hybrid construction project teams. Construction Innovation, 18(1), pp. 109-131. ISSN 1471-4175

Hosseini, M R; Chileshe, N; Baroudi, B; Zuo, J and Mills, A (2016) Factors affecting perceived level of virtuality in hybrid construction project teams: A qualitative study. Construction Innovation, 16(4), pp. 460-482. ISSN 1471-4175

Hosseini, M R; Edwards, D J; Singh, T; Martek, I and Amos, D (2021) Engineering project networks: Providing "sustainable work systems" for construction knowledge workers. Journal of Engineering, Design and Technology, 19(1), pp. 21-40. ISSN 1726-0531

Hosseini, M R; Martek, I; Chileshe, N; Zavadskas, E K and Arashpour, M (2018) Assessing the influence of virtuality on the effectiveness of engineering project networks: "Big five theory" perspective. Journal of Construction Engineering and Management, 144(7): 04018059, ISSN 0733-9364

Hosseini, M R; Roelvink, R; Papadonikolaki, E; Edwards, D J and Pärn, E (2018) Integrating BIM into facility management: Typology matrix of information handover requirements. International Journal of Building Pathology and Adaptation, 36(1), pp. 2-14. ISSN 23984708

Hosseini, S M A; De La Fuente, A and Pons, O (2016) Multicriteria decision-making method for sustainable site location of post-disaster temporary housing in urban areas. Journal of Construction Engineering and Management, 142(9): 04016036, ISSN 0733-9364

Hosseinian, S M and Jaberi, A (2024) Optimal sharing of construction project outcomes with downstream contracting parties: Principal-agent analysis. Journal of Construction Engineering and Management, 150(2): 04023156, ISSN 0733-9364

Hosseinian, S M and Tavakoli, M (2023) Markets, hierarchies, or hybrids as alternative governance structures in construction contracts: Transaction cost economics analysis. Journal of Construction Engineering and Management, 149(1): 04022149, ISSN 0733-9364

Hosseinian, Seyedmahdi (2013) Optimal outcome sharing arrangements in construction target contracts. PhD thesis, University of New South Wales, Australia.

Hou, Y and Wang, H (2026) Collusion prevention under different forms of performance-based subsidies during the operational period in PPP highway projects. Construction Management and Economics, 44(2), pp. 98-118. ISSN 0144-6193

Hou, K; Guan, X; Wang, H; Hu, S; Lu, M and Liu, N (2024) Influence of functional boundary for corridor spaces in elderly facilities in China. Building Research & Information, 52(6), pp. 658-679. ISSN 0961-3218

Hou, L; Tan, Y; Luo, W; Xu, S; Mao, C and Moon, S (2022) Towards a more extensive application of off-site construction: A technological review. International Journal of Construction Management, 22(11), pp. 2154-2165. ISSN 1562-3599

Howard, Robert W (2021) Of incentive, bias, and behaviour: an empirical economic investigation into project delivery constructs influencing the adoption of building information modelling. PhD thesis, University College London, UK.

Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors. PhD thesis, Clemson University, USA.

Howell, G A; Ballard, G and Tommelein, I (2011) Construction engineering-reinvigorating the discipline. Journal of Construction Engineering and Management, 137, pp. 740-744. ISSN 0733-9364

Howsawi, Eskander Mohammed Adam (2014) Effective strategies for successful engineering project delivery during national crises. PhD thesis, University of Technology Sydney, Australia.

Hoxie, C; Berkebile, R and Todd, J A (2012) Stimulating regenerative development through community dialogue. Building Research & Information, 40(1), pp. 65-80. ISSN 0961-3218

Hsu, C L; Wang, J T and Hou, H Y (2023) A blockchain-based parametric model library for knowledge sharing in building information modeling collaboration. Journal of Construction Engineering and Management, 149(11): 04023107, ISSN 0733-9364

Hsu, S-C (2013) A complexity-based approach to intra-organizational team selection. PhD thesis, University of Maryland, College Park, USA.

Hu, F; Liao, R and Chen, J (2023) Calculation methods to optimize the number of pedestals and evaluate production plans for precast yards fabricating prestressed bridge beams and precast segments for poststressed segmental erection. Journal of Construction Engineering and Management, 149(1): 04022146, ISSN 0733-9364

Hu, H (2014) Development of interoperable data protocol for integrated bridge project delivery. PhD thesis, State University of New York at Buffalo, USA.

Hu, J; Ren, Z and Shen, L Y (2008) Impacts of overseas management structures on project buyout management: Case studies of Chinese international contractors. Journal of Construction Engineering and Management, 134(11), pp. 864-875. ISSN 0733-9364

Hu, M and Skibniewski, M (2022) The impact of the design team characteristics on the sustainable building construction cost: Structural equation model analysis. Architectural Engineering and Design Management, 18(5), pp. 614-630. ISSN 1745-2007

Hu, Y and Dossick, C S (2024) Decoding the dynamics of BIM use practice in construction projects. Construction Management and Economics, 42(5), pp. 451-475. ISSN 01446193

Hua, Y.; Hou, F.; Ma, P.; Liu, S. and Guo, W. (2026) Exploring the impact of project team's digital capability on innovation performance: An integrated analysis using PLS-SEM and fsqca. Engineering, Construction and Architectural Management, 33(7), pp. 5695-5714. ISSN 0969-9988

Hua, Y.; Kang, M.; Guo, W. and Zhang, S. (2026) Effect of BIM application maturity on relational norms in construction projects: Mediating role of transaction characteristics. Engineering, Construction and Architectural Management, pp. 1-20. ISSN 0969-9988

Hua, Y.; Liu, S.; Zhang, S.; Ma, P. and Guo, W. (2026) Effects of BIM application maturity on cooperative behavior in construction projects: The mediating role of relational governance. Journal of Construction Engineering and Management, 152(6): 04026078, ISSN 0733-9364

Hua, Y; Zhang, Y and Ma, P (2024) The mediating effect of BIM application on the link between organizational support and BIM user satisfaction. Architectural Engineering and Design Management, 20(3), pp. 636-655. ISSN 1745-2007

Huang, J; Han, D; Zhang, H and Cui, W (2024) Framework and case study for the assembly accuracy prediction of prefabricated buildings using BIM and tls. Architectural Engineering and Design Management, 20(6), pp. 1427-1453. ISSN 1745-2007

Huang, L and Cao, Y (2025) A study on factors influencing the spatial oppressiveness in small courtyard spaces within university residential areas. Architectural Engineering and Design Management, 21(4), pp. 589-602. ISSN 1745-2007

Huang, Mengqi (2022) BIM for underground stations: Supporting decision making on lifecycle stages. PhD thesis, Monash University, Australia.

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175

Huang, Y L and Chou, S P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(4), pp. 379-389. ISSN 01446193

Hudson, F S; Sutrisna, M and Chawynski, G (2021) A certification framework for managing the risks of non-compliance and non-conformance building products: A Western Australian perspective. International Journal of Building Pathology and Adaptation, 39(2), pp. 312-343. ISSN 23984708

Hugill, D (2000) Management as an accomplishment of project team meetings in construction. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Humphreys, M A (2005) Quantifying occupant comfort: Are combined indices of the indoor environment practicable? Building Research & Information, 33(4), pp. 317-325. ISSN 0961-3218

Hung, C-C (1999) A study of factors affecting the implementation of ISO 9000 in Taiwan's construction industry. DIT thesis, University of Northern Iowa, USA.

Hung, Yu-Hsiu (2010) How technology diffuses through construction user culture: An innovation design to improve safety technology adoption. PhD thesis, Virginia Tech, USA.

Hunhevicz, J J (2022) Exploring the potential of blockchain and cryptoeconomics for the construction industry. DSc thesis, ETH Zürich, Switzerland.

Huni, Tendai (2025) Social power configurations influencing relationship strength and supplier performance in the construction industry. PhD thesis, Vaal University of Technology, South Africa.

Hunter, K and Kelly, J (2004) The case for value management in the UK public service sector. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Hurtado, K (2018) An andragogically-centered schema for a heuristic approach to post-collegiate development in the built environment. PhD thesis, Arizona State University, USA.

Hussain, M B (1993) Constraint-based construction project scheduling. PhD thesis, Carnegie Mellon University, USA.

Hussein, M; Darko, A; Eltoukhy, A E E and Zayed, T (2022) Sustainable logistics planning in modular integrated construction using multimethod simulation and taguchi approach. Journal of Construction Engineering and Management, 148(6): 04022022, ISSN 0733-9364

Huynh, N M; Le-Hoai, L; Chuong Nguyen, V H and Tran, C (2025) An assessment framework for underground construction methods in the pre-construction stage: a technical perspective. International Journal of Construction Management, 25(3), pp. 265-277. ISSN 1562-3599

Huynh, T T M; Dang, C N; Le-Hoai, L; Pham, A D and Nguyen, T D (2020) Proposing a strategy map for coastal urban project success using the balanced scorecard method. Engineering, Construction and Architectural Management, 27(10), pp. 2993-3030. ISSN 0969-9988

Hwang, B G and Lim, E S J (2013) Critical success factors for key project players and objectives: Case study of Singapore. Journal of Construction Engineering and Management, 139(2), pp. 204-215. ISSN 0733-9364

Hwang, B G; Thomas, S R; Degezelle, D and Caldas, C H (2008) Development of a benchmarking framework for pharmaceutical capital projects. Construction Management and Economics, 26(2), pp. 177-195. ISSN 1466433X

Hwang, B G and Yang, S (2014) Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(2), pp. 190-205. ISSN 0969-9988

Hwang, B G; Zhao, X and Yang, K W (2019) Effect of BIM on rework in construction projects in Singapore: Status quo, magnitude, impact, and strategies. Journal of Construction Engineering and Management, 145(2): 04018125, ISSN 0733-9364

Hwee Lim, E N G and Yean Yng Ling, F (2002) Model for predicting clients' contribution to project success. Engineering, Construction and Architectural Management, 9(5-6), pp. 388-395. ISSN 0969-9988

Hällström, A A F (2023) Collaborative project delivery models in infrastructure construction. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Ibbs, C W (1997) Quantitative impacts of project change: Size issues. Journal of Construction Engineering and Management, 123(3), pp. 308-311. ISSN 0733-9364

Ibbs, C W and Ashley, D B (1987) Impact of various construction contract clauses. Journal of Construction Engineering and Management, 113(3), pp. 501-521. ISSN 0733-9364

Ibbs, C W; Kwak, Y H; Ng, T and Murat Odabasi, A (2003) Project delivery systems and project change: Quantitative analysis. Journal of Construction Engineering and Management, 129(4), pp. 382-387. ISSN 0733-9364

Ibem, E O; Aduwo, E B; Tunji-Olayeni, P; Ayo-Vaughan, E A and Uwakonye, U O (2016) Factors influencing e-procurement adoption in the Nigerian building industry. Construction Economics and Building, 16(4), pp. 54-67. ISSN 2204-9029

Ibem, E O; Anosike, M N; Azuh, D E and Mosaku, T O (2011) Work stress among professionals in the building construction industry in Nigeria. Construction Economics and Building, 11(3), pp. 46-57. ISSN 2204-9029

Ibn Majdoub Hassani, Z; El Barkany, A; Jabri, A; El Abbassi, I and Darcherif, A M (2020) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology, 18(1), pp. 172-189. ISSN 1726-0531

Ibrahim, A; Ali, H; Abuhendi, F and Jaradat, S (2020) Thermal seasonal variation and occupants' spatial behaviour in domestic spaces. Building Research & Information, 48(4), pp. 364-378. ISSN 0961-3218

Ibrahim, F S; Esa, M and Kamal, E M (2022) Strategies to minimise the impact of COVID-19 on the construction industry: A case study of construction site clusters in Malaysia. Construction Economics and Building, 22(3), pp. 21-42. ISSN 2204-9029

Ibrahim, K I; Costello, S B and Wilkinson, S (2015) Validation of a model for assessing alliance team integration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ibrahim, K I; Costello, S B; Wilkinson, S and Walker, D (2016) Project alliancing: The case of road infrastructure projects in New Zealand. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Ibrahim, M N (2022) Risk management in construction of megahousing projects in Egypt. PhD thesis, London South Bank University, UK.

Ibrahim, M W; Hanna, A S; Russell, J S; Abotaleb, I S and El-Adaway, I H (2020) Quantitative analysis of the impacts of out-of-sequence work on project performance. Journal of Construction Engineering and Management, 146(8): 04020090, ISSN 0733-9364

Ibrahim, M W W (2018) Improving project performance by mitigating out-of-sequence work and assessing construction readiness. PhD thesis, University of Wisconsin - Madison, USA.

Ibrahim Khil, Mohammad Hashim (2025) Automated construction progress monitoring of buildings through mobile mapping and as-built modeling. PhD thesis, University of New South Wales, Australia.

Idoro, G (2009) Evaluating levels of project planning and their effects on performance in the Nigerian construction industry. Construction Economics and Building, 9(2), pp. 39-50. ISSN 2204-9029

Idoro, G I (2009) Clients' perception of construction project leaders in the Nigerian banking industry. Journal of Engineering, Design and Technology, 7(3), pp. 264-281. ISSN 1726-0531

Idoro, G I (2011) Influence of in-sourcing and outsourcing of consultants on construction project performance in Nigeria. Construction Economics and Building, 11(4), pp. 45-58. ISSN 2204-9029

Idoro, G I (2012) The influence of project documents on the outcome of construction projects procured by traditional contracts in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 1-19. ISSN 1823-6499

Idoro, G I and Okun, B O (2009) Evaluating the contribution of project team members to time-overrun in Nigerian federal government projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Idrissi Gartoumi, K; Aboussaleh, M and Zaki, S (2024) Implementing lean construction to improve quality and megaproject construction: A case study. Journal of Financial Management of Property and Construction, 29(1), pp. 1-22. ISSN 1366-4387

Igwe, C; Nasiri, F and Hammad, A (2022) An empirical study on non-physical waste factors in the construction industry. Engineering, Construction and Architectural Management, 29(10), pp. 4088-4106. ISSN 0969-9988

Ihsanallah, K O (1987) The management of superprojects. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Ijaola, I A; Idoro, G I and Oladokun, M G (2023) Developing key indicators for site supervisors' task performance in construction firms. International Journal of Construction Management, 23(2), pp. 349-357. ISSN 1562-3599

Ikediashi, D I (2024) Facilities management strategic roles and services quality performance in Nigeria’s banking sector. Journal of Engineering, Design and Technology, 22(5), pp. 1591-1615. ISSN 1726-0531

Ikediashi, D I; Ogunlana, S O and Alotaibi, A (2014) Analysis of project failure factors for infrastructure projects in Saudi Arabia: A multivariate approach. Journal of Construction in Developing Countries, 19(1), pp. 35-52. ISSN 1823-6499

Ikediashi, D I; Ogunlana, S O and Odesola, I A (2015) Service quality and user satisfaction of outsourced facilities management services in Nigeria's public hospitals. Built Environment Project and Asset Management, 5(4), pp. 363-379. ISSN 2044-124X

Ikediashi, D I and Ogwueleka, A C (2016) Assessing the use of ICT systems and their impact on construction project performance in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(2), pp. 252-276.

Ikediashi, D I and Okolie, K C (2022) An assessment of risks associated with contractor's cash flow projections in South-South, Nigeria. International Journal of Construction Management, 22(11), pp. 2051-2058. ISSN 1562-3599

Ikuabe, M O; Aigbavboa, C O; Thwala, W D; Chiyangwa, D and Oke, A E (2024) Critical factors influencing the failure of joint ventures in the South African construction industry: A confirmatory factor analysis approach. Engineering, Construction and Architectural Management, 31(4), pp. 1678-1695. ISSN 0969-9988

Ikudayisi, A E and Adegun, O B (2025) Pathways for green building acceleration in fast-growing countries: A case study on Nigeria. Built Environment Project and Asset Management, 15(3), pp. 450-466. ISSN 2044-124X

Imam, H (2021) Roles of shared leadership, autonomy, and knowledge sharing in construction project success. Journal of Construction Engineering and Management, 147(7): 04021067, ISSN 0733-9364

Imoudu, E W; Godwin, A U and Nita, A K (2014) Preliminary building information modelling adoption model in Malaysia: A strategic information technology perspective. Construction Innovation, 14(4), pp. 408-432. ISSN 1471-4175

Inançoğlu, S and Uzunoglu, S S (2022) Transformation of social housing kitchens over time: Nicosia göçmenköy social houses as a case study. International Journal of Building Pathology and Adaptation, 40(1), pp. 40-59. ISSN 23984708

Inayat, A; Melhem, H and Esmaeily, A (2015) Critical success factors in an agency construction management environment. Journal of Construction Engineering and Management, 141(1): 06014010, ISSN 0733-9364

Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management. PhD thesis, University of Manchester, UK.

Inyim, P (2015) Time, cost, and environmental impact analysis for sustainable design at multiple building levels. PhD thesis, Florida International University, USA.

Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(1), pp. 59-87. ISSN 01446193

Irfan, M; Jalil, A; Khan, M and Khan, S (2024) Effects of welfare facilities (amenities for well-being) on the satisfaction of civil engineers in construction industry. International Journal of Construction Education and Research, 20(2), pp. 197-217. ISSN 15578771

Iromuanya, C (2013) A qualitative study on construction project success factors in dynamic project environments: A Delphi approach. PhD thesis, Capella University, USA.

Ishtiaque, T A and Klakegg, O J (2025) Effects of early contractor involvement in small construction projects: Lessons from Norway. Built Environment Project and Asset Management, 15(4), pp. 879-893. ISSN 2044-124X

Isiadianso, C (2007) Integrating deconstruction into the project delivery process. PhD thesis, Loughborough University, UK.

Iskandar, K A S (2018) A new comprehensive mathematical assessment methodology for team collaboration and integration and project performance in healthcare construction. PhD thesis, University of Wisconsin - Madison, USA.

Islam, M S; Mohandes, S R; Mahdiyar, A; Fallahpour, A and Olanipekun, A O (2022) A coupled genetic programming Monte Carlo simulation-based model for cost overrun prediction of thermal power plant projects. Journal of Construction Engineering and Management, 148(8): 04022073, ISSN 0733-9364

Islam, M Z (2018) Resourcing for post-disaster housing reconstruction: the case of Cyclones Sidr and Aila in Bangladesh. PhD thesis, London South Bank University, UK.

Islam, Muhammad Saiful (2019) Modelling cost overrun risks in power plant projects. PhD thesis, Queensland University of Technology, Australia.

Ismaeel, W S E (2020) An integrated model for energy-efficient building opening design. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Ismael, D and Shealy, T (2024) Reframing sustainability rating systems to emphasize interconnected benefits increases sustainable design practices among engineers. Journal of Construction Engineering and Management, 150(8): 04024086, ISSN 0733-9364

Ismail, F Z; Halog, A and Smith, C (2017) How sustainable is disaster resilience? An overview of sustainable construction approach in post-disaster housing reconstruction. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 555-572. ISSN 1759-5916

Ismail, S (2013) Factors attracting the use of public private partnership in Malaysia. Journal of Construction in Developing Countries, 18(1), pp. 95-108. ISSN 1823-6499

Ismail, S; Mohamad, R and Mohd Said, J (2022) Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia. Built Environment Project and Asset Management, 12(5), pp. 704-718. ISSN 2044-124X

Issa, D (2016) Understanding performance measurement in private prisons: A complexity perspective approach. PhD thesis, University of Manchester, UK.

Ivory, C (2017) The prospects for a production management body of knowledge in business schools: Response to Koskela (2017) "why is management research irrelevant?". Construction Management and Economics, 35(7), pp. 385-391. ISSN 01446193

Işıklar Bengi, S and Toprakli, A Y (2025) Assessing experiential performance in basketball halls: a comparative measure through post-occupancy evaluation. Architectural Engineering and Design Management, 21(4), pp. 621-641. ISSN 1745-2007

Jaafar, M and Radzi, N M (2013) Level of satisfaction and issues with procurement systems used in the Malaysian public sector. Construction Economics and Building, 13(1), pp. 50-65. ISSN 2204-9029

Jaafari, A (1997) Concurrent construction and life cycle project management. Journal of Construction Engineering and Management, 123(4), pp. 427-436. ISSN 0733-9364

Jaafari, A L I and Manivong, K (1999) The need for life-cycle integration of project processes. Engineering, Construction and Architectural Management, 6(3), pp. 235-255. ISSN 0969-9988

Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.

Jackson, E N and Shanmuga Priya, T (2025) Identifying critical risk management performance indicators for construction projects in Ghana using confirmatory factor analysis. Construction Economics and Building, 25(3-4), pp. 22-42. ISSN 2204-9029

Jackson, B (2005) The perceptions of experienced construction practitioners regarding ethical transgressions in the construction industry. International Journal of Construction Education and Research, 1(2), pp. 112-128. ISSN 1557-8771

Jackson, B J (2000) The perceptions of experienced construction practitioners regarding ethical transgressions in the construction industry. PhD thesis, Colorado State University, USA.

Jackson, B J (2005) Design-build education at associated schools of construction undergraduate programs. International Journal of Construction Education and Research, 1(2), pp. 75-88. ISSN 1557-8771

Jadidoleslami, S. and Saghatforoush, E. (2026) Interdependencies unveiled: MICMAC analysis of BIM-AI synergies in construction. Journal of Construction Engineering and Management, 152(7): 04026086, ISSN 0733-9364

Jadidoleslami, S; Saghatforoush, E; Heravi, A and Preece, C (2022) A practical framework to facilitate constructability implementation using the integrated project delivery approach: A case study. International Journal of Construction Management, 22(7), pp. 1225-1239. ISSN 1562-3599

Jaenglom, Kamonmarn (2014) Exploring construction supply chain management: A systematic perspective for creating sustainable performance. PhD thesis, Università degli Studi di Bergamo, Italy.

Jafari, A and Love, P E D (2013) Quality costs in construction: Case of Qom monorail project in iran. Journal of Construction Engineering and Management, 139(9), pp. 1244-1249. ISSN 0733-9364

Jafari, A; Valentin, V and Bogus, S M (2019) Identification of social sustainability criteria in building energy retrofit projects. Journal of Construction Engineering and Management, 145(2): 04018136, ISSN 0733-9364

Jafary, P; Shojaei, D; Rajabifard, A and Ngo, T (2024) BIM and real estate valuation: Challenges, potentials and lessons for future directions. Engineering, Construction and Architectural Management, 31(4), pp. 1642-1677. ISSN 0969-9988

Jahan, Israt (2024) Life-cycle sustainability analysis of construction and demolition wood waste to achieve circular economy. PhD thesis, RMIT University, Australia.

Jaiswal, S and Kar, S (2025) A decision support system for optimizing labor acquisition in construction. Journal of Construction Engineering and Management, 151(12): 04025211, ISSN 0733-9364

Jalaei, F; Zoghi, M and Khoshand, A (2021) Life cycle environmental impact assessment to manage and optimize construction waste using building information modeling (BIM). International Journal of Construction Management, 21(8), pp. 784-801. ISSN 1562-3599

Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.

Jallow, A K; Demian, P; Baldwin, A and Anumba, C (2008) Life cycle approach to requirements information management in construction projects: State-of-the-art and future trends. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Jallow, H; Renukappa, S and Subashini, S (2021) The impact of COVID-19 outbreak on United Kingdom infrastructure sector. Smart and Sustainable Built Environment, 10(4), pp. 581-593. ISSN 2046-6099

Jamali, Mohammad Hossein Khoshchehreh (2019) Special interpersonal relationships in project-based organizations. PhD thesis, Arizona State University, USA.

Jamieson, I A (1997) Development of a concurrent engineering construction process protocol. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Jamieson, I A (1998) The development of a concurrently engineered procurement process. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning. PhD thesis, University of Wisconsin - Madison, USA.

Jang, J (2008) Improving the make-ready process and forecasting project performance using performance of the make-ready process. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.

Jaradat, S; Whyte, J and Luck, R (2013) Professionalism in digitally mediated project work. Building Research & Information, 41(1), pp. 51-59. ISSN 0961-3218

Jaselskis, E J (1988) Achieving construction project success through predictive discrete choice models. PhD thesis, University of Texas at Austin, USA.

Jaselskis, E J and Ashley, D B (1991) Optimal allocation of project management resources for achieving success. Journal of Construction Engineering and Management, 117(2), pp. 321-340. ISSN 0733-9364

Jaskula, K; Kifokeris, D; Papadonikolaki, E and Rovas, D (2025) Blockchain-based decentralized common data environment: User requirements and conceptual framework. Journal of Construction Engineering and Management, 151(9): 04025112, ISSN 0733-9364

Jaskula, Klaudia (2024) Blockchain-enabled CBIM for lifecycle data provenance. PhD thesis, University College London, UK.

Javed, N; Thaheem, M J; Bakhtawar, B; Nasir, A R; Khan, K I A and Gabriel, H F (2020) Managing risk in green building projects: Toward a dedicated framework. Smart and Sustainable Built Environment, 9(2), pp. 156-173. ISSN 2046-6099

Jawad, S; Ledwith, A and Khan, R (2022) Project control system (PCS) implementation in engineering and construction projects: An empirical study in Saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 31(13), pp. 181-207. ISSN 0969-9988

Jayakody, C; Malalgoda, C I; Amaratunga, D; Haigh, R; Liyanage, C; Hamza, M; Witt, E and Fernando, N (2022) Addressing housing needs of the displaced people promoting resilient and sustainable communities. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 368-385. ISSN 1759-5916

Jayaraj, S; Doerfel, M L and Williams, T (2022) Clique to win: Impact of cliques, competition, and resources on team performance. Journal of Construction Engineering and Management, 148(7): 04022047, ISSN 0733-9364

Jayasinghe, H M; Sandanayake, Y G and Jayasinghe, R (2026) Managing conflicts in joint venture contracts in infrastructure construction projects in Sri Lanka. Built Environment Project and Asset Management, 16(2), pp. 415-436. ISSN 2044-124X

Jayasuriya, S; Zhang, G and Jing Yang, R (2019) Challenges in public private partnerships in construction industry: A review and further research directions. Built Environment Project and Asset Management, 9(2), pp. 172-185. ISSN 2044-124X

Jayasuriya, Sajani (2018) A systematic stakeholder management framework for managing public private partnership projects in Australia. PhD thesis, RMIT University, Australia.

Jayawardana, Jayawardanage Janappriya (2024) Investigating the sustainability of modern construction practices focusing on prefabricated construction. PhD thesis, RMIT University, Australia.

Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988

Jelodar, M B; Yiu, T W and Wilkinson, S (2016) Relationship-quality judgment model for construction project procurement: A conjoint measurement. Journal of Construction Engineering and Management, 142(7): 4016012, ISSN 0733-9364

Jenner, M S (1997) Designing high performance teams for projects: a study of 49 project teams in the UK construction industry. PhD thesis, Open University, UK.

Jens, K and Gregg, J S (2022) Building performances in open and enclosed spaces: A method for balancing operational costs and space utilization with a focus on user needs and satisfaction. Architectural Engineering and Design Management, 18(2), pp. 149-164. ISSN 1745-2007

Jeong, J S; Ramírez-Gómez, Á and González-Gómez, D (2017) A web-based scaffolding-learning tool for design students' sustainable spatial planning. Architectural Engineering and Design Management, 13(4), pp. 262-277. ISSN 1745-2007

Jesumoroti, C; Olanrewaju, A and Khor, S C (2024) Defects in Malaysian hospital buildings. International Journal of Building Pathology and Adaptation, 42(5), pp. 835-856. ISSN 2398-4708

Jeyakumar, R (2013) The implementation and effectiveness of value engineering in the United Arab Emirates. PhD thesis, University of Glamorgan, UK.

Jha, K N and Chockalingam, C T (2011) Prediction of schedule performance of Indian construction projects using an artificial neural network. Construction Management and Economics, 29(9), pp. 901-911. ISSN 1466433X

Ji, W; Abourizk, S M; Zaïane, O R and Li, Y (2018) Complexity analysis approach for prefabricated construction products using uncertain data clustering. Journal of Construction Engineering and Management, 144(8): 04018063, ISSN 0733-9364

Ji, Wenying (2018) Simulation-based analytics for fabrication quality-associated decision support. PhD thesis, University of Alberta, Canada.

Jia, A. Y. and Luk, C. W. (2026) From techno-optimism to value co-creation: A circular value system analysis on the modular transitional housing programme in Hong Kong. Construction Management and Economics, 44(7), pp. 537-563. ISSN 0144-6193

Jia, J; Jiang, S; Xiao, L and Lu, F (2025) Transforming digital resources into project management performance: A knowledge-based view. Engineering, Construction and Architectural Management, 32(8), pp. 5638-5656. ISSN 0969-9988

Jia, J and Wu, M (2025) Examining the effectiveness of knowledge governance mechanisms in mobile messaging groups within construction project teams. Engineering, Construction and Architectural Management, 32(8), pp. 5019-5039. ISSN 0969-9988

Jia, J; Wu, M and Hwang, B G (2025) Exploring factors influencing knowledge sharing in mobile social media groups within construction project teams. Engineering, Construction and Architectural Management, 32(2), pp. 1330-1347. ISSN 0969-9988

Jiang, W.; Jiang, J.; Martek, I. and Jiang, W. (2025) Critical risk management strategies for the operation of public–private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988

Jiang, A (2005) A decision support model for cost and activity-based performance measurement in steel construction. PhD thesis, University of Florida, USA.

Jiang, W; Jiang, J; Martek, I and Jiang, W (2025) Critical risk management strategies for the operation of public-private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988

Jiang, W and Lu, Y (2017) Influence of initial trust on control from client perspective: Construction industry in China. Engineering, Construction and Architectural Management, 24(2), pp. 326-345. ISSN 0969-9988

Jiang, W and Martek, I (2024) Strategies for managing the political risk of investing in infrastructure projects, in developing countries. Engineering, Construction and Architectural Management, 31(10), pp. 4079-4098. ISSN 0969-9988

Jiang, W; Jiang, J; Martek, I and Jiang, W (2025) Critical risk management strategies for the operation of public-private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988

Jiang, Y; Yang, G; Li, H; Zhang, T and Khudhair, A (2024) Physics-informed knowledge-driven decision-making framework for holistic bridge maintenance. Journal of Construction Engineering and Management, 150(9): 04024105, ISSN 0733-9364

Jiang, Z (2010) Exploring the roles of trust, reliance and commitment in business relationships. PhD thesis, University of Manchester, UK.

Jibrin, I M and Aminu, S M (2023) Information technology as catalyst for value re-engineering implementation in the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 189-216. ISSN 1823-6499

Jijingi, A T (2019) A BIM-enabled procurement framework in new buildings for the Nigerian architecture, engineering and construction industry. PhD thesis, University of Portsmouth, UK.

Jiménez-Moreno, P (2020) Mass customisation for zero energy housing: the potential of Japanese manufacturing practices in the context of sustainable housebuilding in the United Kingdom. PhD thesis, University of Edinburgh, UK.

Jin, H; Chan, M; Morda, R; Lou, C X and Vrcelj, Z (2023) A scientometric review of sustainable infrastructure research: Visualization and analysis. International Journal of Construction Management, 23(11), pp. 1847-1855. ISSN 1562-3599

Jin, R; Zuo, J and Hong, J (2019) Scientometric review of articles published in ASCE's journal of construction engineering and management from 2000 to 2018. Journal of Construction Engineering and Management, 145(8): 06019001, ISSN 0733-9364

Jin, X; Ekanayake, E M A C and Shen, G Q P (2022) Critical policy drivers for modular integrated construction projects in Hong Kong. Building Research & Information, 50(4), pp. 467-484. ISSN 0961-3218

Johansen, K W; Hong, K; Schultz, C and Teizer, J (2024) Automated quantification of construction workers’ exposure to falling object hazards. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 207-222. ISSN 17514304

John, S. T.; Roy, B. K.; Sarkar, P. and Davis, R. (2020) IoT enabled real-time monitoring system for early-age compressive strength of concrete. Journal of Construction Engineering and Management, 146(2): 05019020, ISSN 0733-9364

John, S T; Sarkar, P and Davis, R (2023) A long-range wide-area network system for monitoring early-age concrete compressive strength. Journal of Construction Engineering and Management, 149(1): 04022148, ISSN 0733-9364

Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531

Johnson, C; Lizarralde, G and Davidson, C H (2006) A systems view of temporary housing projects in post-disaster reconstruction. Construction Management and Economics, 24(4), pp. 367-378. ISSN 01446193

Johnson, R D (2016) Integrated project delivery in architecture, engineering, and construction: An interpretative phenomenological analysis of practice. DM thesis, Colorado Technical University, USA.

Johnsson, H; Janols, H and Stehn, L (2006) 3D computer visualization in timber construction: some important parameters. Architectural Engineering and Design Management, 2(3), pp. 161-175. ISSN 1745-2007

Johnsson, H and Meiling, J H (2009) Defects in offsite construction: Timber module prefabrication. Construction Management and Economics, 27(7), pp. 667-681. ISSN 1466433X

Johnston, D; Farmer, D; Brooke-Peat, M and Miles-Shenton, D (2016) Bridging the domestic building fabric performance gap. Building Research & Information, 44(2), pp. 147-159. ISSN 0961-3218

Jones, B K (1998) A model for collaborative engineering the construction industry. PhD thesis, University of Southampton, UK.

Jones, Barry Kenneth (1998) A model for collaborative engineering in the construction industry. PhD thesis, University of Southampton, UK.

Jones, K and Kaluarachchi, Y (2007) Operational factors affecting strategic partnering in UK social housing. Engineering, Construction and Architectural Management, 14(4), pp. 334-345. ISSN 0969-9988

Jones, K; Mosca, L; Whyte, J; Davies, A and Glass, J (2022) Addressing specialization and fragmentation: Product platform development in construction consultancy firms. Construction Management and Economics, 40(11-12), pp. 918-933. ISSN 01446193

Jones, L (2023) The golden thread of information and fire safety in construction: Making our buildings safer through the development of a robust design specification strategy and BIM framework integration. PhD thesis, University of Derby, UK.

Jones, W; Gibb, A; Goodier, C and Bust, P (2015) Managing the unknown: The health risks of nanomaterials in the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Jonsson, A Z and Muyingo, H (2019) Building inspection in multi-dwelling housing and the perception of building quality. Construction Economics and Building, 19(2), pp. 144-159. ISSN 2204-9029

Jonsson, H (2018) Production strategy in project based production within a house-building context. PhD thesis, Linköping University, Sweden.

Jonsson, H and Rudberg, M (2017) KPIs for measuring performance of production systems for residential building: A production strategy perspective. Construction Innovation, 17(3), pp. 381-403. ISSN 1471-4175

Joseph, A and Hamilton, D K (2008) The Pebble Projects: Coordinated evidence-based case studies. Building Research & Information, 36(2), pp. 129-145. ISSN 0961-3218

Joseph, V R and Mustaffa, N K (2023) Carbon emissions management in construction operations: A systematic review. Engineering, Construction and Architectural Management, 30(3), pp. 1271-1299. ISSN 0969-9988

Joseph Garcia, A and Mollaoglu, S (2020) Individuals' capacities to apply transferred knowledge in AEC project teams. Journal of Construction Engineering and Management, 146(4): 04020016, ISSN 0733-9364

Joubert, F J (2015) Risk simulation in a portfolio of port and rail capital projects. PhD thesis, University of Pretoria, South Africa.

Joukar, A (2016) Analysis and management of the price volatility in the construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Ju, C; Ning, Y and Shen, Y (2025) How do different management control configurations influence construction safety professionals' work attitudes. Engineering, Construction and Architectural Management, 32(5), pp. 2870-2889. ISSN 0969-9988

Järvenpää, A T; Eriksson, P E and Larsson, J (2022) Exploring a public client's control systems in infrastructure projects from a relationship history perspective. Construction Management and Economics, 40(1), pp. 56-71. ISSN 01446193

J⊘rgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a "lean" perspective. Construction Innovation, 9(2), pp. 225-240. ISSN 1471-4175

Kaatz, E; Root, D and Bowen, P (2005) Broadening project participation through a modified building sustainability assessment. Building Research & Information, 33(5), pp. 441-454. ISSN 0961-3218

Kabiri, S (2014) Role conflict and role ambiguity in construction projects. PhD thesis, University of Reading, UK.

Kabiri, S and Hughes, W P (2018) The interplay between formal and informal elements in analysing situations of role conflict among construction participants. Construction Management and Economics, 36(12), pp. 651-665. ISSN 01446193

Kabiri, S; Hughes, W P and Schweber, L (2012) Role conflict and role ambiguity in construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Kabiri, S; Hughes, W P and Schweber, L (2014) Role conflict in project team dynamics. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Kadir, M R b A (1996) Conceptual phase best practices. PhD thesis, Loughborough University, UK.

Kaewmoracharoen, M (2009) Feasibility of visualization and simulation applications to improve work zone safety and mobility. PhD thesis, Iowa State University, USA.

Kagan, H A; Leary, D J and Pratter, G E K (1986) Design engineers' responsibilities during construction. Journal of Construction Engineering and Management, 112(3), pp. 394-402. ISSN 0733-9364

Kagioglou, M; Cooper, R; Aouad, G and Sexton, M (2000) Rethinking construction: The generic design and construction process protocol. Engineering, Construction and Architectural Management, 7(2), pp. 141-153. ISSN 0969-9988

Kahvandi, Z; Melhado, S and Viana, M L (2023) Solutions to overcome integrated project delivery implementation barriers: A meta-synthesis approach. Journal of Construction in Developing Countries, 28(1), pp. 63-89. ISSN 1823-6499

Kahvandi, Z; Saghatforoush, E; Ravasan, A Z and Viana, M L (2020) A review and classification of integrated project delivery implementation enablers. Journal of Construction in Developing Countries, 25(2), pp. 219-236. ISSN 1823-6499

Kaka, A; Wong, C; Fortune, C and Langford, D (2008) Culture change through the use of appropriate pricing systems. Engineering, Construction and Architectural Management, 15(1), pp. 66-77. ISSN 0969-9988

Kakar, A S; Hasan, A; Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1570-1590. ISSN 1726-0531

Kakitahi, J M; Alinaitwe, H M; Landin, A and Mudaaki, S P (2015) A study of non-compliance with quality requirements in Uganda. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(1), pp. 22-42. ISSN 17514304

Kalach, M; Abdul-Malak, M A and Srour, I (2021) Design information release under alternative design-construction modes. Engineering, Construction and Architectural Management, 28(4), pp. 969-993. ISSN 0969-9988

Kalasapudi, V S (2017) Automatic change-based diagnosis of structures using spatiotemporal data and as-designed model. PhD thesis, Arizona State University, USA.

Kale, S and Arditi, D (2006) Diffusion of ISO 9000 certification in the precast concrete industry. Construction Management and Economics, 24(5), pp. 485-495. ISSN 1466433X

Kale, S and Arditi, D (2010) Innovation diffusion modeling in the construction industry. Journal of Construction Engineering and Management, 136(3), pp. 329-340. ISSN 0733-9364

Kaluarachchi, Y and Jones, K (2004) Improving the delivery of social housing in UK- using the Amphion initiative as a case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kaluarachchi, Y D and Jones, K (2007) Monitoring of a strategic partnering process: The Amphion experience. Construction Management and Economics, 25(10), pp. 1053-1061. ISSN 1466433X

Kam, C W (2000) Quality assurance of construction works in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Kamal, E M (2011) Absorptive capacity and implementation of new technology in Malaysian small and medium sized construction companies. PhD thesis, University of Reading, UK.

Kamal, E M and Flanagan, R (2012) Understanding absorptive capacity in Malaysian small and medium sized (SME) construction companies. Journal of Engineering, Design and Technology, 10(2), pp. 180-198. ISSN 1726-0531

Kamara, J M (2012) Integration in the project development process of a private finance initiative (PFI) project. Architectural Engineering and Design Management, 8(4), pp. 228-245. ISSN 1745-2007

Kamari, M and Ham, Y (2025) Advancing 3D object detection and segmentation in construction jobsites using an open vocabulary approach. Journal of Construction Engineering and Management, 151(10): 04025141, ISSN 0733-9364

Kamel, M; Khallaf, R and Nosaier, I (2023) Net present value-time curve behaviour of public private partnership projects. International Journal of Construction Management, 23(11), pp. 1924-1931. ISSN 1562-3599

Kamel Hedayat Abad, M E (2017) Integration and interoperability of building envelope information and energy modeling. PhD thesis, Pennsylvania State University, USA.

Kampschroer, K and Heerwagen, J H (2005) The strategic workplace: Development and evaluation. Building Research & Information, 33(4), pp. 326-337. ISSN 0961-3218

Kamunda, A; Renukappa, S; Suresh, S and Jallow, H (2021) BIM in the water industry: Addressing challenges to improve the project delivery process. Engineering, Construction and Architectural Management, 28(2), pp. 510-529. ISSN 0969-9988

Kang, L S and Paulson, B C (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management, 124(5), pp. 381-389. ISSN 0733-9364

Kangari, R and Halpin, D W (1989) Potential robotics utilization in construction. Journal of Construction Engineering and Management, 115(1), pp. 126-143. ISSN 0733-9364

Kaplanoglu, S B (2007) Impact of pre-project peer review on project success. PhD thesis, Illinois Institute of Technology, USA.

Kappia, J G; Dainty, A R J and Price, A D F (2006) Using qualitative methods to explore career development for construction operatives. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Karim, J A; Demian, P; Baldwin, A and Anumba, C (2014) An empirical study of the complexity of requirements management in construction projects. Engineering, Construction and Architectural Management, 21(5), pp. 505-531. ISSN 0969-9988

Karim, K; Marosszeky, M and Davis, S (2006) Managing subcontractor supply chain for quality in construction. Engineering, Construction and Architectural Management, 13(1), pp. 27-42. ISSN 0969-9988

Karimi, H and Taghaddos, H (2020) Impact of age on the strength of experience and education role in fatal injuries prevention in Iranian construction craft workers. Journal of Construction Engineering and Management, 146(7): 04020070, ISSN 0733-9364

Karimi, S (2021) A systematic methodology for evaluating and balancing acceptance risks with pay factors for highway construction materials. PhD thesis, University of Maryland, College Park, USA.

Karlovsek, J; Meath, C; Miles-Mwangangi, L; MacDonald, C and Brockmann, A (2024) Implementing circular economy principles in infrastructure procurement to support circular supply chains. Engineering, Construction and Architectural Management, 31(11), pp. 4645-4658. ISSN 0969-9988

Karmakar, S (2025) Third-party quality control concept, methodology, and implementation in the building and housing construction industry in India. International Journal of Construction Management, 25(9), pp. 1021-1031. ISSN 1562-3599

Karnasuta, P (2004) An examination of the effects of web-based virtual working environments on team effectiveness within construction projects. PhD thesis, University of Reading, UK.

Kartam, N A (1996) Making effective use of construction lessons learned in project life cycle. Journal of Construction Engineering and Management, 122(1), pp. 14-21. ISSN 0733-9364

Karunasena, G and Rameezdeen, R (2010) Post-disaster housing reconstruction: Comparative study of donor vs owner-driven approaches. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 173-191. ISSN 1759-5916

Kasabreh, N S S and Tarawneh, S A (2021) Investigating the impact of contractor's performance on the success of Jordanian residential construction projects. International Journal of Construction Management, 21(5), pp. 468-475. ISSN 1562-3599

Kashiwagi, D; Parmar, D and Savicky, J (2003) Case study of the impact of specifications, construction management and inspection on construction performance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kashiwagi, D T; Halmrast, C T and Tisthammer, T (1996) Intelligent procurement of construction systems. Journal of Construction Procurement, 2(1), pp. 56-65. ISSN 1358-9180

Kashwani, G A (2017) Enhancing the implementation of safety engineering systems in oil and gas construction projects in the UAE. PhD thesis, Heriot-Watt University, UK.

Kasozi, P and Tutesigensi, A (2007) A framework for appraising construction projects using carbon footprint. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Kassem, M; Kelly, G; Dawood, N; Serginson, M and Lockley, S (2015) BIM in facilities management applications: A case study of a large university complex. Built Environment Project and Asset Management, 5(3), pp. 261-277. ISSN 2044-124X

Kassim, Y H (2012) Information technology business value model for engineering and construction industry. PhD thesis, University of Salford, UK.

Kaunda, R T (2020) Project Delivery Methods impact on efficient delivery of road construction projects in Malawi. PhD thesis, University of Bolton, UK.

Kavishe, N and Chileshe, N (2017) Joint venture housing projects in dar es salaam city: An analysis of challenges and effectiveness. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kazar, G; Doǧan, N B; Ayhan, B U and Tokdemir, O B (2022) Quality failures-based critical cost impact factors: Logistic regression analysis. Journal of Construction Engineering and Management, 148(12): 04022138, ISSN 0733-9364

Kazaz, A and Birgonul, M T (2005) Determination of quality level in mass housing projects in Turkey. Journal of Construction Engineering and Management, 131(2), pp. 195-202. ISSN 0733-9364

Ke, Y; Davis, P and Jefferies, M (2016) A conceptual model of psychological contracts in construction projects. Construction Economics and Building, 16(3), pp. 20-37. ISSN 2204-9029

Kedir, F; Hall, D M; Brantvall, S; Lessing, J; Hollberg, A and Soman, R K (2024) Circular information flows in industrialized housing construction: The case of a multi-family housing product platform in Sweden. Construction Innovation, 24(5), pp. 1354-1379. ISSN 1471-4175

Keenan, M and Rostami, A (2021) The impact of quality management systems on construction performance in the North West of England. International Journal of Construction Management, 21(9), pp. 871-883. ISSN 1562-3599

Kehily, D (2016) Leveraging building information modelling to address the barriers that prevent the widespread adoption of life cycle costing by quantity surveyors. PhD thesis, University of Salford, UK.

Keirouz, W T (1988) Domain modeling of constructed facilities for robotic applications. PhD thesis, Carnegie Mellon University, USA.

Kelly, D and Koo, H J (2024) Challenges managing large historic building renovations: Lessons learned from detroit, Michigan. Journal of Construction Engineering and Management, 150(2): 05023015, ISSN 0733-9364

Kelly, D J (2015) Investigating the relationships of project performance measures with the use of building information modeling (BIM) and integrated project delivery (IPD). PhD thesis, Eastern Michigan University, USA.

Kelly, J (2007) Making client values explicit in value management workshops. Construction Management and Economics, 25(4), pp. 435-442. ISSN 1466433X

Kemmer, S (2018) Development of a method for construction management in refurbishment projects. PhD thesis, University of Huddersfield, UK.

Kennedy, P; Morrison, A and Milne, D O (1997) Resolution of disputes arising from set-off clauses between main contractors and subcontractors. Construction Management and Economics, 15(6), pp. 527-537. ISSN 01446193

Kennedy, R and Sidwell, A C (2001) Re-engineering the construction delivery process: The museum of tropical Queensland, townsville: a case study. Construction Innovation, 1(2), pp. 77-89. ISSN 1471-4175

Kent, D C and Becerik-Gerber, B (2010) Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management, 136(8), pp. 815-825. ISSN 0733-9364

Kereri, J O (2020) The effects of relational and social behaviors exhibited by construction project team members on relationship quality and project outcomes. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Kereri, J O and Harper, C M (2019) Social networks and construction teams: Literature review. Journal of Construction Engineering and Management, 145(4): 03119001, ISSN 0733-9364

Kermanshachi, S (2016) Decision making and uncertainty analysis in success of construction projects. PhD thesis, Texas A&M University, USA.

Kermanshachi, S; Dao, B; Rouhanizadeh, B; Shane, J and Anderson, S (2020) Development of the project complexity assessment and management framework for heavy industrial projects. International Journal of Construction Education and Research, 16(1), pp. 24-42. ISSN 1557-8771

Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction. Journal of Financial Management of Property and Construction, 11(2), pp. 75-90. ISSN 1366-4387

Keskin, B; Salman, B and Koseoglu, O (2022) Architecting a BIM-based digital twin platform for airport asset management: A model-based system engineering with sysml approach. Journal of Construction Engineering and Management, 148(5): 04022020, ISSN 0733-9364

Keskin, B; Salman, B and Ozorhon, B (2021) Airport project delivery within BIM-centric construction technology ecosystems. Engineering, Construction and Architectural Management, 28(2), pp. 530-548. ISSN 0969-9988

Keskin, F S (2021) Integration of lifecycle assessment into structural intervention scenarios for assessing environmental impacts of vulnerable buildings. PhD thesis, University of Birmingham, UK.

Kestle, L; Potangaroa, R and Storey, B (2011) Integration of lean design and design management and its influence on the development of a multidisciplinary design management model for remote site projects. Architectural Engineering and Design Management, 7(2), pp. 139-153. ISSN 1745-2007

Keusters, G; Bakker, H and Houwing, E J (2024) Improving the performance of civil engineering projects through the integrated design process. Journal of Engineering, Design and Technology, 22(2), pp. 344-364. ISSN 1726-0531

Keusters, G; Batelaan, F; SleeswijkVisser, F; Houwing, E J and Bakker, H (2025) The potential of the empathic ability for the performance of civil engineering projects. Journal of Engineering, Design and Technology, 23(1), pp. 184-206. ISSN 1726-0531

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khadour, L and Darkwa, J (2008) Tqem in the UK construction industry: Some key findings from a survey. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Khadour, L; Ramsay-Dawber, P and Morledge, R (2009) Case studies on the implementation of TQEM in the UK building contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Khadour, Lina (2010) Total quality environmental management (tqem) framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.

Khalef, R and El-Adaway, I H (2023) Identifying design-build decision-making factors and providing future research guidelines: Social network and association rule analysis. Journal of Construction Engineering and Management, 149(1): 04022151, ISSN 0733-9364

Khalef, R and El-Adaway, I H (2024) Performance of project delivery methods for us airport projects: A holistic quantitative risk-based assessment through perceptions of associated industry experts. Journal of Construction Engineering and Management, 150(10): 04024141, ISSN 0733-9364

Khalfan, M and Raja, N (2005) Improving construction process through integration and concurrent engineering. Construction Economics and Building, 5(1), pp. 58-66. ISSN 2204-9029

Khalfan, M M A; Anumba, C J and Carrillo, P M (2001) Concurrent engineering readiness assessment of sub-contractors within the UK construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Khalifa, M; Farrell, P and Emam, H (2015) The concept of partnering in public–private partnership projects in the United Arab Emirates. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 277-284. ISSN 17514304

Khalifa, R I (2019) Evaluating project assessment techniques for high-profile transportation projects development and delivery: Case of state departments of transportation (DOTS) in the United States. PhD thesis, Portland State University, USA.

Khalife, S; Pourrahimian, E; Didluck, T and Hamzeh, F (2024) Demystifying the dynamic link between project value and design team networks: A socio-technical lean management framework. Architectural Engineering and Design Management, 20(6), pp. 1357-1380. ISSN 1745-2007

Khalili, A and Chua, D K (2014) Integrated prefabrication configuration and component grouping for resource optimization of precast production. Journal of Construction Engineering and Management, 140(2): 04013052, ISSN 0733-9364

Khallaf, R (2016) Interactional risks associated with parties to a PPP project. PhD thesis, Purdue University, USA.

Khallaf, Z; Alshibani, A; Alsawafy, O; Mohammed, A and Bubshait, A (2024) Dynamic fleet configuration model for optimizing earthmoving operations using mixed integer linear programming. Journal of Construction Engineering and Management, 150(11): 04024152, ISSN 0733-9364

Khamkanya, T (2011) A holistic approach to workplace environments, management systems and new technologies in meeting corporate end-user requirements. PhD thesis, University of Ulster, UK.

Khan, S (2017) Using the last planner system and lean principles to improve workflow in BIM-based building design projects. PhD thesis, University of Huddersfield, UK.

Khanyile, N S M; Musonda, I and Agumba, J N (2019) Evaluating the relationship between communication management practices and project outcomes: A case study of Eswatini (Swaziland) construction industry. Construction Economics and Building, 19(2), pp. 197-219. ISSN 2204-9029

Khanzadi, M; Sheikhkhoshkar, M and Banihashemi, S (2020) BIM applications toward key performance indicators of construction projects in Iran. International Journal of Construction Management, 20(4), pp. 305-320. ISSN 1562-3599

Khanzode, A R (2011) An integrated virtual design and construction and lean (IVL) method for coordination of mechanical, electrical and plumbing (MEP) systems. PhD thesis, Stanford University, USA.

Khatatbeh, A A (2023) Quantifying the impact of ISO 9001 standard on the project and engineering management and success factors; a case of construction industry. Engineering, Construction and Architectural Management, 30(6), pp. 2564-2581. ISSN 0969-9988

Kheel, M (2024) The impact of risk and uncertainty on healthcare project delivery and its effect on intra-group conflict in the context of Saudi Arabia. PhD thesis, University of Manchester, UK.

Khesal, T; Saghaei, A; Khalilzadeh, M; Rahiminezhad Galankashi, M and Soltani, R (2019) Integrated cost, quality, risk and schedule control through earned value management (EVM). Journal of Engineering, Design and Technology, 17(1), pp. 183-203. ISSN 1726-0531

Khodabakhshian, Ania (2023) Machine learning for risk management in construction projects. PhD thesis, Politecnico di Milano, Italy.

Khoshbakht Iradmoosa, Maryam (2019) Building performance studies for higher education campus buildings: Energy use, occupant satisfaction and thermal comfort. PhD thesis, Griffith University, Australia.

Khoshgoftar, M; Bakar, A H A and Osman, O (2010) Causes of delays in Iranian construction projects. International Journal of Construction Management, 10(2), pp. 53-69. ISSN 1562-3599

Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988

Khosrowshahi, F and Alani, M (2003) Event and effect model of building maintenance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kian Manesh Rad, E (2016) Development of a project complexity assessment method for energy megaprojects. PhD thesis, Heriot-Watt University, UK.

Kiani, H (1998) A model for measuring effectiveness of building construction organisations: Owner's perspective. PhD thesis, University of Waterloo, USA.

Kiani Mavi, N; Brown, K; Fulford, R G and Goh, M (2025) An MCDM analysis of critical success criteria for medium and large construction projects in Australia and New Zealand. Engineering, Construction and Architectural Management, 32(8), pp. 5160-5193. ISSN 0969-9988

Kibwami, N (2016) Enhancing sustainable construction in the building sector of Uganda using embodied carbon accounting. PhD thesis, University of Leeds, UK.

Kibwami, N and Tutesigensi, A (2015) Exploring the potential of accounting for embodied carbon emissions in building projects in Uganda. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Kifokeris, D and Tezel, A (2025) Blockchain and lean construction: An exploration of bidirectional synergies and interactions. Architectural Engineering and Design Management, 21(1), pp. 171-189. ISSN 1745-2007

Kikuchi, S; Kronprasert, N and Easa, S M (2012) Aggregate blending using fuzzy optimization. Journal of Construction Engineering and Management, 138(12), pp. 1411-1420. ISSN 0733-9364

Kikwasi, G J; Sospeter, N G and Rwelamila, P D (2023) Critical success factors for adopting supply chain management in Tanzanian construction projects. Journal of Construction in Developing Countries, 28(1), pp. 43-61. ISSN 1823-6499

Killingsworth, J; Mehany, M H and Kim, J (2021) Using accounting ratios to measure construction industry lag. Journal of Financial Management of Property and Construction, 26(2), pp. 181-200. ISSN 1366-4387

Kim, B; Lee, H; Park, H and Kim, H (2012) Greenhouse gas emissions from onsite equipment usage in road construction. Journal of Construction Engineering and Management, 138(8), pp. 982-990. ISSN 0733-9364

Kim, D Y (2011) Construction planning and execution strategies for enhancing project success on electrical construction subcontracts. PhD thesis, University of Texas at Austin, USA.

Kim, J and Irizarry, J (2021) Evaluating the use of augmented reality technology to improve construction management student’s spatial skills. International Journal of Construction Education and Research, 17(2), pp. 99-116. ISSN 1557-8771

Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.

Kim, Jungsoo (2014) Impact of indoor environmental quality (IEQ) factors on occupant evaluation of workspaces. PhD thesis, University of Sydney, Australia.

Kim, Y W and Kim, S C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(2), pp. 163-172. ISSN 1466433X

Kim Wan Siu, G; Bridge, A and Skitmore, M (2001) Assessing the service quality of building maintenance providers: Mechanical and engineering services. Construction Management and Economics, 19(7), pp. 719-726. ISSN 01446193

Kimmance, A G (2002) An integrated product and process information modelling system for on-site construction. PhD thesis, Loughborough University, UK.

Kinawy, S N (2017) Customizing information delivery for citizens in transportation infrastructure projects: Towards active community participation in decision-making. PhD thesis, University of Toronto, Canada.

Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building. PhD thesis, University of Liverpool, UK.

Kirkham, R J and Boussabaine, A H (2000) Developing a framework for whole of life costing in the national health service estate. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Kishk, M a U C (2008) The impact of effective risk management on project success. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Kismet, B and Colakoglu, M B (2026) Developing a building-scale circularity indicator through fuzzy analytical hierarchy process and gini index-based circularity calculation methods. International Journal of Construction Management, 26(6), pp. 994-1016. ISSN 1562-3599

Kissi, E; Agyekum, K; Baiden, B K; Tannor, R A; Asamoah, G E and Andam, E T (2019) Impact of project monitoring and evaluation practices on construction project success criteria in Ghana. Built Environment Project and Asset Management, 9(3), pp. 364-382. ISSN 2044-124X

Kissi, E; Eluerkeh, K; Aigbavboa, C; Addy, M and Babon-Ayeng, P (2025) Project managers' competencies in the era of digitalization: The case of the construction industry. Built Environment Project and Asset Management, 15(1), pp. 165-189. ISSN 2044-124X

Kissi, J (2012) Improving innovation and project performance in construction professional services firms: the leadership role of middle managers. PhD thesis, Loughborough University, UK.

Kistler, L (2024) Engineering team success: Evaluating perceptions of teamwork processes and emergent states effects on team outcomes. PhD thesis, Clemson University, USA.

Kjeldsen, L and Stender, M (2022) Bringing social sustainability into the mix: Framing planning dilemmas in mixed-tenure regeneration. Building Research & Information, 50(7), pp. 709-721. ISSN 0961-3218

Klapa, P. and Mitka, B. (2026) UAV data for BIM-based building assessment across construction stages: Sensor utility evaluation. Building Research & Information, 54(5), pp. 552-572. ISSN 0961-3218

Klitgaard, A; Beck, F and Buhl, H (2018) Facilitation of interorganizational teams: An exploratory literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Klotz, L (2008) Process transparency for sustainable building delivery. PhD thesis, Pennsylvania State University, USA.

Klotz, L and Horman, M (2010) Counterfactual analysis of sustainable project delivery processes. Journal of Construction Engineering and Management, 136(5), pp. 595-605. ISSN 0733-9364

Klous, Jason D (2026) Investigating the role of the language action perspective in improving communication and collaboration in lean construction teams. PhD thesis, Nottingham Trent University, UK.

Knost, Benjamin (2022) Incorporating resilience in infrastructure investment decisions: Developed framework, specifications, estimations, and evaluation. PhD thesis, Ohio State University, USA.

Ko, C H and Cheng, M Y (2007) Dynamic prediction of project success using artificial intelligence. Journal of Construction Engineering and Management, 133(4), pp. 316-324. ISSN 0733-9364

Ko, W H (2021) View and environmental quality in buildings. PhD thesis, University of California, Berkeley, USA.

Koch, C and Buser, M (2020) Good enough quality: Multiple quality cultures in a Swedish region. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Koch, C and Haugen, T I (2004) An it R&D-programme without new code?! State driven it development in Denmark. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Koch, C and Urup, L (2017) Project performance: An emerging constellation of multiple institutions. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Koch, M; Emilsson, K; Lee, J and Johansson, H (2024) Structural barriers to sufficiency: the contribution of research on elites. Buildings & Cities, 5(1), pp. 268-282. ISSN 2632-6655

Koehn, E and Datta, N K (2003) Quality, environmental, and health and safety management systems for construction engineering. Journal of Construction Engineering and Management, 129(5), pp. 562-569. ISSN 0733-9364

Kog, F and Yaman, H (2016) A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(6), pp. 709-726. ISSN 0969-9988

Kog, Y C and Loh, P K (2012) Critical success factors for different components of construction projects. Journal of Construction Engineering and Management, 138(4), pp. 520-528. ISSN 0733-9364

Koh, T Y (2010) The effects of social capital on construction project success: exploring the mediating role of projectlearning. PhD thesis, University of Hong Kong, Hong Kong.

Koh T Y, T M M R S (2013) A relational approach to high reliability organising for construction project safety: A conceptual framework. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Kokkaew, N (2010) Risk flexibility analysis in infrastructure project finance. PhD thesis, Columbia University, USA.

Kokkonen, A (2017) Integrated project emerging within the daily project life through active participation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Konchar, M and Sanvido, V (1998) Comparison of U.S. Project delivery systems. Journal of Construction Engineering and Management, 124(6), pp. 435-444. ISSN 0733-9364

Konchar, M D (1997) A comparison of United States project delivery systems. PhD thesis, Pennsylvania State University, USA.

Kong, M.; Son, Y. J.; Snyder, E.; Byun, K.; C. Pope, Z. and Hogan, C. J. (2026) Indoor environmental quality in the era of hybrid work: Comparing home and healthy office environments. Building Research & Information, 54(6), pp. 693-713. ISSN 0961-3218

Kono, J (2018) Improving the sustainability performance of building materials: An approach from life cycle thinking. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Konukcu, S (2011) A knowledge chain framework for construction supply chains. PhD thesis, Loughborough University, UK.

Koo, H J and O'Connor, J T (2022) A strategy for building design quality improvement through BIM capability analysis. Journal of Construction Engineering and Management, 148(8): 04022066, ISSN 0733-9364

Koolwijk, J S J (2022) Rules, power and trust: Interplay between inter-organizational structures and interpersonal relationships in project-based organizations in the construction industry. PhD thesis, Delft University of Technology, Netherlands.

Koranteng, C; Simons, B and Essel, C (2019) Climate responsive buildings: A comfort assessment of buildings on KNUST campus, Kumasi. Journal of Engineering, Design and Technology, 17(5), pp. 862-877. ISSN 1726-0531

Korb, S and Sacks, R (2021) Agent-based simulation of general contractor-subcontractor interactions in a multiproject environment. Journal of Construction Engineering and Management, 147(1): 1944, ISSN 0733-9364

Kordestani Ghalenoei, N; Babaeian Jelodar, M; Paes, D and Sutrisna, M (2024) Challenges of offsite construction and BIM implementation: Providing a framework for integration in New Zealand. Smart and Sustainable Built Environment, 13(4), pp. 780-808. ISSN 2046-6099

Kordi, N E; Belayutham, S and Che Ibrahim, C K I (2025) Development and demonstration of a social sustainability assessment tool for the construction project life cycle. Construction Innovation, 25(1), pp. 161-186. ISSN 1471-4175

Kordi, N E; Belayutham, S; Ibrahim, C K I C and Zulkifli, A R (2019) The attributes of social sustainability in construction: A theoretical exploration. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Korkmaz, S (2007) Piloting evaluation metrics for high performance green building project delivery. PhD thesis, Pennsylvania State University, USA.

Korkmaz, S; Riley, D and Horman, M (2010) Piloting evaluation metrics for sustainable high-performance building project delivery. Journal of Construction Engineering and Management, 136(8), pp. 877-885. ISSN 0733-9364

Korkmaz, S; Riley, D and Horman, M (2011) Assessing project delivery for sustainable, high-performance buildings through mixed methods. Architectural Engineering and Design Management, 7(4), pp. 266-274. ISSN 1745-2007

Kornakova, M and March, A (2017) The role of citizens in DRR planning exercises: When to inform or consult. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 209-222. ISSN 1759-5916

Koseoglu, O and Nurtan-Gunes, E T (2018) Mobile BIM implementation and lean interaction on construction site: A case study of a complex airport project. Engineering, Construction and Architectural Management, 25(10), pp. 1298-1321. ISSN 0969-9988

Koseoglu, O; Sakin, M and Arayici, Y (2018) Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project. Engineering, Construction and Architectural Management, 25(10), pp. 1339-1354. ISSN 0969-9988

Koskela, L and Ballard, G (2006) Should project management be based on theories of economics or production? Building Research & Information, 34(2), pp. 154-163. ISSN 0961-3218

Kosonen, H K and Kim, A A (2018) Mental model approach to wastewater treatment plant project delivery during emergency response. Journal of Construction Engineering and Management, 144(6): 05018005, ISSN 0733-9364

Kothapally, P R; Gbadamosi, A Q; Delgado, J M D and Mahamadu, A M (2023) An implementation strategy for the application of digital twin for construction progress monitoring using wearable technologies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Koushki, P A; Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294. ISSN 01446193

Kraft, E R (2013) Alternative quality assurance organizations for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Kraidi, Layth (2020) Development of an integrated risk management framework for oil and gas pipeline projects. PhD thesis, Liverpool John Moores University, UK.

Krishnan, R (1987) Knowledge-based aids for model construction. PhD thesis, University of Texas at Austin, USA.

Krystallis, I (2016) A study of the concept of future-proofing in healthcare building asset management and the role of BIM in its delivery. PhD thesis, Loughborough University, UK.

Kucukvar, M (2013) Life cycle sustainability assessment framework for the U.S. Built environment. PhD thesis, University of Central Florida, USA.

Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.

Kuiper, I and Holzer, D (2013) Rethinking the contractual context for building information modelling (BIM) in the Australian built environment industry. Construction Economics and Building, 13(4), pp. 1-17. ISSN 2204-9029

Kukah, A S K; Owusu-Manu, D G; Badu, E and Edwards, D J (2024) Reasons for entering into Ghanaian public-private partnership (PPP) power projects. Journal of Engineering, Design and Technology, 22(3), pp. 854-878. ISSN 1726-0531

Kula, B and Ergen, E (2021) Implementation of a BIM-FM platform at an international airport project: Case study. Journal of Construction Engineering and Management, 147(4): 05021002, ISSN 0733-9364

Kulaksiz, T (2019) Analysis of factors influencing return on investment (ROI) for building information modeling (BIM) implementation. PhD thesis, Wayne State University, USA.

Kulatunga, U; Amaratunga, D and Haigh, R (2009) Critical success factors of construction research and development. Construction Management and Economics, 27(9), pp. 891-900. ISSN 1466433X

Kumamoto, T; Kameda, H; Hoshiya, M and Ishii, K (1990) Construction of difficult dry dock in yokohama, Japan. Journal of Construction Engineering and Management, 116(2), pp. 201-220. ISSN 0733-9364

Kumar, D and Zhang, C (2025) Carbon emission reduction in construction industry: Qualitative insights on procurement, policies and artificial intelligence. Built Environment Project and Asset Management, 15(3), pp. 399-414. ISSN 2044-124X

Kumar, V and Lin, E T A (2020) Conceptualizing "COBieEvaluator": A rule based system for tracking asset changes using COBie datasheets. Engineering, Construction and Architectural Management, 27(5), pp. 1093-1118. ISSN 0969-9988

Kumaraswamy, M; Mahesh, G; Mahalingam, A; Loganathan, S and Kalidindi, S N (2017) Developing a clients' charter and construction project KPIs to direct and drive industry improvements. Built Environment Project and Asset Management, 7(3), pp. 253-270. ISSN 2044-124X

Kumaraswamy, M M (1991) Evaluating the management of construction projects. PhD thesis, Loughborough University, UK.

Kumaraswamy, M M (1996) The pursuit of quality in Hong Kong construction. Engineering, Construction and Architectural Management, 3(4), pp. 289-306. ISSN 0969-9988

Kumaraswamy, M M (2006) Accelerating construction industry development. Journal of Construction in Developing Countries, 11(1), pp. 73-94. ISSN 1823-6499

Kumaraswamy, M M and Chan, D W M (1999) Factors facilitating faster construction. Journal of Construction Procurement, 5(2), pp. 88-98. ISSN 1358-9180

Kumaraswamy, M M; Ling, F Y Y; Anvuur, A M and Rahman, M M (2007) Targeting relationally integrated teams for sustainable PPPs. Engineering, Construction and Architectural Management, 14(6), pp. 581-596. ISSN 0969-9988

Kumaraswamy, M M; Ling, F Y Y; Rahman, M M and Phng, S T (2005) Constructing relationally integrated teams. Journal of Construction Engineering and Management, 131(10), pp. 1076-1086. ISSN 0733-9364

Kumaraswamy Associate Professor, M; Kong, H and Xue Qing Doctoral, Z (2004) Focusing on best value from a source selection perspective. Construction Economics and Building, 4(1), pp. 21-34. ISSN 2204-9029

Kunkcu, H.; Koc, K. and Gurgun, A. P. (2026) Uncovering communication methods, forms, and dynamics in construction projects: A comparative analysis. International Journal of Construction Education and Research, 22(2), pp. 233-253. ISSN 1557-8771

Kunkcu, H; Koc, K and Gurgun, A P (2026) Unveiling communication quality in the construction industry: A multilevel evaluation of project, group, and individual outcomes. Journal of Construction Engineering and Management, 152(2): 04025259, ISSN 0733-9364

Kunkcu, H; Koc, K and Gurgun, A P (2025) Work-family conflict and high-quality relationships in construction project management: The effect of job and life satisfaction. Engineering, Construction and Architectural Management, 32(6), pp. 3937-3962. ISSN 0969-9988

Kuo, Vincent (2019) Latent semantic analysis for knowledge management in construction. DSc(Tech) thesis, Aalto University, Finland.

Kuoribo, E; Amoah, P; Kissi, E; Edwards, D J; Gyampo, J A and Thwala, W D (2024) Analysing the effect of multicultural workforce/teams on construction productivity. Journal of Engineering, Design and Technology, 22(3), pp. 969-990. ISSN 1726-0531

Kuoribo, E; Yomoah, R; Owusu-Manu, D G; Acheampong, A; John Edwards, D and Debrah, C (2023) Assessing the interactive effects of the ethics of construction professionals on project performance in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 30(10), pp. 5233-5252. ISSN 0969-9988

Kurokawa, M (2015) Tracing client interests in the course of a project: Why are some client interests incorporated whereas others are not? PhD thesis, University of Reading, UK.

Kussl, S; Wald, A and Flak, L S (2025) Change must come from within: Study of digital transformation in construction client organizations. Journal of Construction Engineering and Management, 151(3): 05024017, ISSN 0733-9364

Kusuma, I C (2016) The evolution of culture-climate interplay in temporary multi-organisations: the case of construction alliancing projects. PhD thesis, University College London, UK.

Kwofie, T E; Adinyira, E and Botchway, E A (2015) Identification of the critical project management competencies of architects in the Ghanaian construction industry. International Journal of Construction Management, 15(4), pp. 288-298. ISSN 1562-3599

Kwofie, T E; Adinyira, E and Fugar, F (2016) Modelling the effect of housing design unit contract packaging on mass housing project team communication performance. Journal of Construction in Developing Countries, 21(1), pp. 35-50. ISSN 1823-6499

Kwofie, T E; Adinyira, E and Fugar, F (2017) Theoretical and practical implications for engendering project team communication effectiveness in mass housing project delivery in Ghana. Journal of Engineering, Design and Technology, 15(6), pp. 826-844.

Kwofie, T E; Aigbavboa, C and Baiden-Amissah, A (2020) Ontology of the communication performance prospects of building information modelling adoption among project teams in construction project delivery. Journal of Construction in Developing Countries, 25(1), pp. 21-43. ISSN 1823-6499

Kwofie, T E; Aigbavboa, C O and Machethe, S O (2019) Nature of communication performance in non-traditional procurements in South Africa. Engineering, Construction and Architectural Management, 26(10), pp. 2264-2288. ISSN 0969-9988

Kwofie, T E; Alhassan, A; Botchway, E and Afranie, I (2015) Factors contributing towards the effectiveness of construction project teams. International Journal of Construction Management, 15(2), pp. 170-178. ISSN 1562-3599

Kwofie, T E; Amos-Abanyie, S; Fugar, F; Afram, S O; Aigbavboa, C O and Olympio, G F (2023) Nature of communication performance among multi-teams in mass housing project delivery: A fuzzy set theory approach. International Journal of Construction Management, 23(9), pp. 1506-1517. ISSN 1562-3599

Kwofie, T E; Botchway, E A and Amos-Abanyie, S (2018) Examining the performance level of project management competencies of architects in Ghana using gap analysis approach. Journal of Construction in Developing Countries, 23(1), pp. 125-147. ISSN 1823-6499

Kwofie, T E; Ohis Aigbavboa, C and Thwala, W D (2019) Communication performance challenges in PPP projects: Cases of Ghana and South Africa. Built Environment Project and Asset Management, 9(5), pp. 628-641. ISSN 2044-124X

Kwok, T W; Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for hong kong's high-rise residential buildings: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(2), pp. 526-543. ISSN 0969-9988

Kwon, N; Park, M; Lee, H S; Ahn, J and Shin, M (2016) Construction noise management using active noise control techniques. Journal of Construction Engineering and Management, 142(7): 4016014, ISSN 0733-9364

Kylili, A; Georgali, P Z; Christou, P and Fokaides, P (2024) An integrated building information modeling (BIM)-based lifecycle-oriented framework for sustainable building design. Construction Innovation, 24(2), pp. 492-514. ISSN 1471-4175

Kyrö, R; Peltokorpi, A and Luoma-Halkola, L (2019) Connecting adaptability strategies to building system lifecycles in hospital retrofits. Engineering, Construction and Architectural Management, 26(4), pp. 633-647. ISSN 0969-9988

Kärnä, S (2009) Concepts and attributes of customer satisfaction in construction. PhD thesis, Aalto University, Finland.

Kärnä, S and Junnonen, J-M (2017) Designers' performance evaluation in construction projects. Engineering, Construction and Architectural Management, 24(1), pp. 154-169. ISSN 0969-9988

Labik, O; Nahmens, I; Ikuma, L and Harvey, C (2023) On-site versus in-factory installation of solar-plus-storage in modular construction. Journal of Construction Engineering and Management, 149(5): 05023003, ISSN 0733-9364

Ladzani, M W (2009) Evaluation of small and medium-sized enterprises' performance in the built environment. DPhil thesis, University of Johannesburg, South Africa.

Laganakou, G (2020) What feasible macro-scale interventions could stimulate a sustainable growth in the UK housing retrofit industry? An examination of the potential impact from supply-chain innovations on low energy retrofit of pre-1919 housing. PhD thesis, University of Northampton, UK.

Lahdenperä, P (2026) Design-build with a development phase: The underlying theory. Journal of Construction Engineering and Management, 152(4): 04026025, ISSN 0733-9364

Lahdenperä, P (2001) An analysis of the statistics on project procurement methods in Finland, 1989-1998. Journal of Construction Procurement, 7(1), pp. 27-41. ISSN 1358-9180

Lahdenperä, P (2012) How to proportion capability and fee percentage for team comparison in competitive early involvement. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Lahdenperä, P (2012) Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(1), pp. 57-79. ISSN 1466433X

Lahdenperä, P (2024) Design–build with a development phase: An initiation and the first trials. Construction Economics and Building, 24(4-5), pp. 18-42. ISSN 2204-9029

Lahdenperä, P and Koppinen, T (2009) Financial analysis of road project delivery systems. Journal of Financial Management of Property and Construction, 14(1), pp. 61-78. ISSN 1366-4387

Lahouti, A (2017) Cue-based decision-making in construction work crews: An agent-based modeling approach. PhD thesis, Michigan State University, USA.

Lai, A W Y and Lai, W M (2013) Users' satisfaction survey on building maintenance in public housing. Engineering, Construction and Architectural Management, 20(4), pp. 420-440. ISSN 0969-9988

Laitinen, J (1998) Model based construction process management. PhD thesis, KTH Royal Institute of Technology, Sweden.

Laitinen, K; Luhtala, M; Örmä, M and Vaismaa, K (2024) Productivity development enablers in the infrastructure sector: Capability maturity model integration approach. Built Environment Project and Asset Management, 14(2), pp. 201-227. ISSN 2044-124X

Lam, T Y M and Gale, K S (2026) Construction framework process: A qualitative investigation of behaviour change drivers and project outcomes. Construction Innovation, 26(1), pp. 83-96. ISSN 1471-4175

Lam, E W M; Chan, A P C and Chan, D M W (2006) Drivers for design-build applications in the public sector of Hong Kong. Journal of Construction Procurement, 12(1),

Lam, E W M; Chan, A P C; Olawumi, T O; Wong, I and Kazeem, K O (2024) Sustainability concepts in global high-rise residential buildings: A scientometric and systematic review. Smart and Sustainable Built Environment, 13(2), pp. 425-443. ISSN 2046-6099

Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(2), pp. 84-95. ISSN 0961-3218

Lam, K C; Hu, T S and Ng, S T (2005) Using the principal component analysis method as a tool in contractor pre-qualification. Construction Management and Economics, 23(7), pp. 673-684. ISSN 01446193

Lam, K C; Lam, M C K and Wang, D (2008) MBNQA-oriented self-assessment quality management system for contractors: Fuzzy AHP approach. Construction Management and Economics, 26(5), pp. 447-461. ISSN 1466433X

Lam, K C; Runeson, G; Ng, S T; Hu, T S; Cheung, S O and Deng, Z M (2001) Capital budget planning practices of building contractors in Hong Kong. Construction Management and Economics, 19(6), pp. 569-576. ISSN 01446193

Lam, K Y (2017) The role of tacit knowledge in knowledge intensive project management. PhD thesis, Heriot-Watt University, UK.

Lam, P T I; Kumaraswamy, M M and Ng, S T (2004) The use of construction specifications in Singapore. Construction Management and Economics, 22(10), pp. 1067-1079. ISSN 01446193

Lam, P T I and Wong, F W H (2009) Improving building project performance: How buildability benchmarking can help. Construction Management and Economics, 27(1), pp. 41-52. ISSN 1466433X

Lam, T (2017) A web-based Decision Support System to assist SMEs to broker risks and rewards for BIM adoption. PhD thesis, University of the West of England, Bristol, UK.

Lam, T Y M (2022) Driving sustainable construction development through post-contract key performance indicators and drivers. Smart and Sustainable Built Environment, 11(3), pp. 483-499. ISSN 2046-6099

Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387

Lam, T Y M; Brock, T and Gale, K S (2025) Is "design and build" suitable for social housing projects in the UK housing crisis? Built Environment Project and Asset Management, 15(4), pp. 863-878. ISSN 2044-124X

Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lam, Y T (1995) A knowledge-based system for planning and scheduling ready-mixed concrete. PhD thesis, Loughborough University, UK.

Lama, Supreet (2023) Improving design briefing with BIM-based concept generation aiming to enhance building project performance. PhD thesis, University of West London, UK.

Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.

Lamb, D J and Merna, T (2004) Reappraisal of public private partnerships: An overview of refinancing, restructuring and termination. Journal of Financial Management of Property and Construction, 9(3), pp. 155-162. ISSN 1366-4387

Lambers, R; Lamari, F; Skitmore, M and Rajendra, D (2024) Key residential construction defects: A framework for their identification and correlated causes. Construction Innovation, 24(6), pp. 1425-1459. ISSN 1471-4175

Lamirande, M (2023) Exploring practices and understandings of designing inclusively. PhD thesis, Open University, UK.

Lan, R; Adenuga, O and Awolusi, I (2026) Professionals' perspectives on the factors causing construction project failures in developing countries: A case study of Lagos metropolis. International Journal of Construction Management, 26(3), pp. 511-535. ISSN 1562-3599

Landin, A M and Persson, M H (1998) Evaluation of quality systems for specialist contractors. Engineering, Construction and Architectural Management, 5(3), pp. 210-219. ISSN 0969-9988

Lang, R; Goodier, C and Glass, J (2016) Are housebuilders' production strategies a barrier to offsite construction uptake in the UK? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Langston, C (2013) Development of generic key performance indicators for PMBOK® using a 3D project integration model. Construction Economics and Building, 13(4), pp. 78-91. ISSN 2204-9029

Langston, C (2013) The application of data envelopment analysis to the benchmarking of construction performance in Australian and American high-rise buildings. International Journal of Construction Management, 13(3), pp. 55-75. ISSN 1562-3599

Langston, C (2013) The role of coordinate-based decision-making in the evaluation of sustainable built environments. Construction Management and Economics, 31(1), pp. 62-77. ISSN 1466433X

Langston, C (2014) Construction efficiency: A tale of two developed countries. Engineering, Construction and Architectural Management, 21(3), pp. 320-335. ISSN 0969-9988

Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(6), pp. 2231-2254. ISSN 0969-9988

Laovisutthichai, V.; Viryasiri, T.; Low, S. P.; Sangnin, K.; Kramomtong, W. and Panjapiyakul, N. (2026) Collaborative architecture, engineering, construction, and operations (aeco) practice model for healthcare facilities in Thailand. International Journal of Construction Management, 26(7), pp. 1170-1190. ISSN 1562-3599

Lapinski, A R; Horman, M J and Riley, D R (2006) Lean processes for sustainable project delivery. Journal of Construction Engineering and Management, 132(10), pp. 1083-1091. ISSN 0733-9364

Larsen, J K; Lindhard, S M; Brunoe, T D and Jensen, K N (2018) The relation between pre-planning, commissioning and enhanced project performance. Construction Economics and Building, 18(2), pp. 1-14. ISSN 2204-9029

Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.

Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(9), pp. 2060-2083. ISSN 0969-9988

Laryea, S and Watermeyer, R (2014) Innovative construction procurement at Wits University. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 220-231. ISSN 17514304

Latiff, A M A; Jaapar, A and Isa, C M M (2020) Project governance practices in urban public housing projects: A case study of public housing in Malaysia. Construction Economics and Building, 20(4), pp. 120-136. ISSN 2204-9029

Latorre, V (2009) Construction manager's influence on project success. PhD thesis, University of Plymouth, UK.

Latorre, V and Riley, M (2010) Utilizing analytical hierarchy process to prioritize critical success factors in construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lau, E and Rowlinson, S (2009) The expectations, needs, risks and constraints for project performance. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599

Laurent, J and Leicht, R M (2019) Practices for designing cross-functional teams for integrated project delivery. Journal of Construction Engineering and Management, 145(3): 05019001, ISSN 0733-9364

Lavy, S; Garcia, J A; Scinto, P and Dixit, M K (2014) Key performance indicators for facility performance assessment: Simulation of core indicators. Construction Management and Economics, 32(12), pp. 1183-1204. ISSN 01446193

Lavy, S and Shohet, I M (2004) Integrated maintenance management of hospital buildings: A case study. Construction Management and Economics, 22(1), pp. 25-34. ISSN 01446193

Lawani, K; Billy, H and Cameron, I (2021) Conceptualising self-determination theory as an indicator for improving construction worker motivation. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Lawson, W D (2004) Trust and trustworthiness in professional-client relationships: Procurement of architect /engineer services by Texas municipalities. PhD thesis, Texas Tech University, USA.

Lazo, A G; Çidik, M S; Addyman, S and Rillie, I (2024) Perspectives on project management and asset management integration: A systematic review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Le, A T H; Domingo, N; Rasheed, E and Park, K S (2018) Building maintenance cost planning and estimating: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Le, M A T and Brønn, C (2007) Linking experience and learning: Application to multi-project building environments. Engineering, Construction and Architectural Management, 14(2), pp. 150-163. ISSN 0969-9988

Le, T (2009) Improving right-of-way acquisition in highway projects through scope definition and management of inherent factors. PhD thesis, University of Texas at Austin, USA.

Le, T; Caldas, C H; Gibson, G E and Thole, M (2009) Assessing scope and managing risk in the highway project development process. Journal of Construction Engineering and Management, 135(9), pp. 900-910. ISSN 0733-9364

Le, T; Hassan, F; Le, C and Jeong, H D (2022) Understanding dynamic data interaction between civil integrated management technologies: A review of use cases and enabling techniques. International Journal of Construction Management, 22(6), pp. 1011-1032. ISSN 1562-3599

Le Masurier, J W (2001) Developing the observational method as a systematic approach to uncertainty management. PhD thesis, University of Bristol, UK.

Leaman, A and Bordass, B (1999) Productivity in buildings: The 'killer' variables. Building Research & Information, 27(1), pp. 4-19. ISSN 0961-3218

Leaman, A and Bordass, B (2001) Assessing building performance in use 4: The probe occupant surveys and their implications. Building Research & Information, 29(2), pp. 129-143. ISSN 0961-3218

Lebea, M J; Agumba, J N and Adebowale, O J (2024) Critical success factors in the maintenance strategies of public healthcare facilities. International Journal of Building Pathology and Adaptation, 42(7), pp. 55-75. ISSN 23984708

Leblanc, H; Thomson, C and Nitithamyong, P (2011) Mapping sustainability related knowledge of construction planned works: A social housing case study. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Ledbetter, W B (1994) Quality performance on successful project. Journal of Construction Engineering and Management, 120(1), pp. 34-46. ISSN 0733-9364

Leder, S; Newsham, G R; Veitch, J A; Mancini, S and Charles, K E (2016) Effects of office environment on employee satisfaction: A new analysis. Building Research & Information, 44(1), pp. 34-50. ISSN 0961-3218

Lee, B; Lee, H S; Park, M and Kim, H (2015) Influence factors of learning-curve effect in high-rise building constructions. Journal of Construction Engineering and Management, 141(8): 04015019, ISSN 0733-9364

Lee, C C (2007) Developing an appropriate methodology for matching project team's knowledge with client's project requirements in refurbishment projects. PhD thesis, Glasgow Caledonian University, UK.

Lee, C Y; Chong, H Y; Tanko, B L and Klufallah, M (2022) Effect between trust in communication technology and interorganizational trust in BIM-enabled projects. Journal of Construction Engineering and Management, 148(8): 04022059, ISSN 0733-9364

Lee, D E and Arditi, D (2006) Total quality performance of design/build firms using quality function deployment. Journal of Construction Engineering and Management, 132(1), pp. 49-57. ISSN 0733-9364

Lee, F K S (2016) Construction contractor selection criteria: the effects of relational norms, price and prequalification. PhD thesis, University of Reading, UK.

Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Lee, G and Kim, S (2012) Case study of mass customization of double-curved metal façade panels using a new hybrid sheet metal processing technique. Journal of Construction Engineering and Management, 138(11), pp. 1322-1330. ISSN 0733-9364

Lee, G; Lee, G; Chi, S and Oh, S (2023) Automatic classification of construction work codes in bill of quantities of national roadway based on text analysis. Journal of Construction Engineering and Management, 149(2): 04022163, ISSN 0733-9364

Lee, H W (2012) Application of target value design to energy efficiency investments. PhD thesis, University of California, Berkeley, USA.

Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988

Lee, K J (2013) A formal and ontological approach to embed commissioning test protocol into building information model. PhD thesis, Carnegie Mellon University, USA.

Lee, K R and Fenn, P (2007) Investigation of critical factors affecting successful mediation: Korean mediation users perspectives. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Lee, K T; Im, J B; Park, S J and Kim, J H (2025) Identifying improvements priorities in daycare centre space performance from teachers' perspectives: Application of importance–performance analysis and structural equation modelling. Engineering, Construction and Architectural Management, 32(1), pp. 639-672. ISSN 0969-9988

Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.

Lee, S and Yu, J (2016) Comparative study of BIM acceptance between Korea and the United States. Journal of Construction Engineering and Management, 142(3): 05015016, ISSN 0733-9364

Lee, S H (2009) Computational fieldwork support for efficient operation and maintenance of mechanical, electrical and plumbing systems. PhD thesis, Carnegie Mellon University, USA.

Lee, S M and Olson, D L (1983) Chance constrained aggregate blending. Journal of Construction Engineering and Management, 109(1), pp. 39-47. ISSN 0733-9364

Lee, Z P; Rahman, R A and Doh, S I (2021) Key drivers for adopting design-build in public construction projects: Malaysian perspective. Journal of Construction in Developing Countries, 26(1), pp. 131-160. ISSN 1823-6499

Lee, Z P; Rahman, R A and Doh, S I (2022) Application of decision support tool in design-build projects: A quasi-experiment with novice decision makers. Built Environment Project and Asset Management, 12(4), pp. 537-555. ISSN 2044-124X

Lees, M A (2009) Measuring the value of engagement between higher education and industry and practice in the built environment. PhD thesis, University of Salford, UK.

Lefebvre, G (2009) The influence of the psychological characteristics of the team members on construction project performance. PhD thesis, University of Salford, UK.

Legesse, A; Nejat, A and Ghebrab, T (2025) The coupling of project delivery methods and contract strategies for public building projects in Ethiopia. Construction Innovation, 25(2), pp. 400-418. ISSN 1471-4175

Lehtiranta, L and Junnonen, J M (2014) Stretching risk management standards: Multi-organizational perspectives. Built Environment Project and Asset Management, 4(2), pp. 128-145. ISSN 2044-124X

Lehtiranta, L; Kärnä, S; Junnonen, J M and Julin, P (2012) The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(6), pp. 463-475. ISSN 1466433X

Lehtovaara, J; Seppänen, O and Peltokorpi, A (2022) Improving construction management with decentralised production planning and control: Exploring the production crew and manager perspectives through a multi-method approach. Construction Management and Economics, 40(4), pp. 254-277. ISSN 01446193

Lehtovaara, J; Seppänen, O; Peltokorpi, A; Kujansuu, P and Grönvall, M (2021) How Takt production contributes to construction production flow: A theoretical model. Construction Management and Economics, 39(1), pp. 73-95. ISSN 01446193

Lehtovaara, Joonas (2023) Takt production and decentralized decision-making: Improving construction production flow with novel planning & control approaches. DScTech thesis, Aalto University, Finland.

Leiringer, R (2003) Technological innovations in the context of public-private partnership projects. PhD thesis, KTH Royal Institute of Technology, Sweden.

Leite, Regina Maria Cunha (2022) Gamification strategies and visual management: A model for disseminating production information and feedback to civil construction workers. PhD thesis, Universidade Senai Cimatec, Brazil.

Leite Júnior, José Agnaldo Pereira (2016) Analysis of the quality of work life applications in the construction industry. PhD thesis, Universidade Estadual de Campinas, Brazil.

Lekan, A; Aigbavboa, C and Emetere, M (2023) Managing quality control systems in intelligence production and manufacturing in contemporary time. International Journal of Construction Management, 23(8), pp. 1436-1446. ISSN 1562-3599

Lemma, M; Tarsi, M and Carbonari, A (2025) Development of a framework to track life safety levels of occupants in the event of a fire in buildings. Architectural Engineering and Design Management, 21(4), pp. 681-704. ISSN 1745-2007

Lennartsson, M; André, S and Elgh, F (2023) Plm support for design platforms in industrialized house-building. Construction Innovation, 23(2), pp. 265-286. ISSN 1471-4175

Leon, M and Laing, R (2022) A concept design stages protocol to support collaborative processes in architecture, engineering and construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 777-799. ISSN 1726-0531

Leslie-Carter, R; Zou, P X W and Tan, E X (2009) Managing international projects: A case study of the water cube aquatic centre for Beijing 2008 olympic games. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Leung, M Y; Chen, D and Yu, J (2008) Demystifying moderate variables of the interrelationships among affective commitment, job performance, and job satisfaction of construction professionals. Journal of Construction Engineering and Management, 134(12), pp. 963-971. ISSN 0733-9364

Leung, M Y; Chong, A; Ng, S T and Cheung, M C K (2004) Demystifying stakeholders' commitment and its impacts on construction projects. Construction Management and Economics, 22(7), pp. 701-715. ISSN 01446193

Leung, M Y and Liu, A M M (1998) Developing a value management model by value-goal system approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Leung, M Y and Liu, A M M (2003) Analysis of value and project goal specificity in value management. Construction Management and Economics, 21(1), pp. 11-19. ISSN 01446193

Leung, M Y; Ng, S T and Cheung, S O (2004) Measuring construction project participant satisfaction. Construction Management and Economics, 22(3), pp. 319-331. ISSN 01446193

Leung, M Y; Wei, X and Ojo, L D (2024) Developing a value-risk management model for construction projects. Journal of Construction Engineering and Management, 150(1): 04023148, ISSN 0733-9364

Leung, M Y; Yu, J and Liang, Q (2013) Improving public engagement in construction development projects from a stakeholder's perspective. Journal of Construction Engineering and Management, 139(11): 4013019, ISSN 0733-9364

Leung, M-Y (2000) Value Management in construction projects. Unpublished PhD thesis, City University of Hong Kong, Hong Kong.

Leung, M-y and Yu, R K T (2003) An investigation of conflict resolution in the construction industry. Journal of Construction Procurement, 9(1), ISSN 1358-9180

Levitt, R E (2007) CEM research for the next 50 years: Maximizing economic, environmental, and societal value of the built environment. Journal of Construction Engineering and Management, 133(9), pp. 619-628. ISSN 0733-9364

Li, B; Huang, Y; Lim, H W; Wang, L and Fang, D (2026) How foreman safety leadership influences worker safety behavior: An empirical study from a developmental psychology perspective. Journal of Construction Engineering and Management, 152(2): 04025254, ISSN 0733-9364

Li, J. and Li, Y. (2026) A mini review of greenhouse gas emissions and mitigation strategies in the building sector. International Journal of Building Pathology and Adaptation, 44(5), pp. 1302-1328. ISSN 2398-4708

Li, J.; Sun, J.; Cao, J. and Mao, L. (2026) Evolutionary dynamics of multiagent on-chain adoption strategies in blockchain-enabled smart construction. Journal of Construction Engineering and Management, 152(8): 04026113, ISSN 0733-9364

Li, X.; Lin, M.; Chen, J. and Jim, C. Y. (2026) A lifecycle-based risk assessment framework for prefabricated building supply chains using G1-entropy weight and cloud matter-element models. Engineering, Construction and Architectural Management, 33(7), pp. 5645-5674. ISSN 0969-9988

Li, Y and Zhong, R Y (2026) Spatial-temporal traceability and coordination in modular integrated construction: A future framework with hybrid digital twin and reinforcement learning. International Journal of Construction Management, 26(5), pp. 875-904. ISSN 1562-3599

Li, B (2008) Domestic private finance project development in China. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Li, C; Zhao, Y and Chen, W F (2024) Effects of commitment-based governance on the relationship between formal control and PPP projects performance: Mediating and moderating. Engineering, Construction and Architectural Management, 31(2), pp. 696-715. ISSN 0969-9988

Li, H; Arditi, D and Wang, Z (2012) Transaction-related issues and construction project performance. Construction Management and Economics, 30(2), pp. 151-164. ISSN 1466433X

Li, H; Arditi, D and Wang, Z (2014) Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(4), pp. 444-458. ISSN 0969-9988

Li, H; Chan, G; Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(5), pp. 536-550. ISSN 0969-9988

Li, H; Chen, Y; Zheng, J; Fang, Y; Yang, Y; Skitmore, M; Rusch, R and Jiang, T (2024) The influence of the psychological contract on the safety of performance of construction workers in China. Engineering, Construction and Architectural Management, 31(5), pp. 1879-1895. ISSN 0969-9988

Li, H; Li, W; Wang, L and Lv, L (2021) Public satisfaction evaluation of urban water environment treatment public-private partnership project: A case study from China. International Journal of Building Pathology and Adaptation, 39(2), pp. 407-432. ISSN 23984708

Li, H T (2013) Modeling and evaluating multi-stakeholder multi-objective decisions during public participation in major infrastructure and constructionprojects. PhD thesis, University of Hong Kong, Hong Kong.

Li, H X; Ma, Z; Liu, H; Wang, J; Al-Hussein, M and Mills, A (2020) Exploring and verifying BIM-based energy simulation for building operations. Engineering, Construction and Architectural Management, 27(8), pp. 1679-1702. ISSN 0969-9988

Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.

Li, J; Moselhi, O and Alkass, S (2006) Forecasting project status by using fuzzy logic. Journal of Construction Engineering and Management, 132(11), pp. 1193-1202. ISSN 0733-9364

Li, J; Wang, H; Xie, Y and Zeng, W (2020) Human error identification and analysis for shield machine operation using an adapted tracer method. Journal of Construction Engineering and Management, 146(8): 04020095, ISSN 0733-9364

Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364

Li, Mei (2012) A waste management system for small and medium enterprises engaged in office building retrofit projects. PhD thesis, Queensland University of Technology, Australia.

Li, Q (2012) Inter-organizational relationships in the programme management lifecycle. PhD thesis, University of Leeds, UK.

Li, Q; Syal, M; Turner, N and Arif, M (2013) Constructors and innovation credits in green building projects. Construction Innovation, 13(3), pp. 320-338. ISSN 1471-4175

Li, Q; Yang, Y; Yao, G; Wei, F; Xue, G and Qin, H (2024) Multiobject real-time automatic detection method for production quality control of prefabricated laminated slabs. Journal of Construction Engineering and Management, 150(3): 05023017, ISSN 0733-9364

Li, S; Wang, J and Xu, Z (2025) Automated compliance checking for BIM models based on Chinese-NLP and knowledge graph: An integrative conceptual framework. Engineering, Construction and Architectural Management, 32(6), pp. 3832-3856. ISSN 0969-9988

Li, W X (2015) A performance management methodology for collaborative design and construction project teams. PhD thesis, Stanford University, USA.

Li, Y; Cao, L; Han, Y and Wei, J (2020) Development of a conceptual benchmarking framework for healthcare facilities management: Case study of Shanghai municipal hospitals. Journal of Construction Engineering and Management, 146(1): 05019016, ISSN 0733-9364

Li, Y; He, N; Li, H; Liu, Z and Qi, J (2021) Influencing factors on inter-organizational trust asymmetry behavior in construction projects: Evidence from China. Engineering, Construction and Architectural Management, 28(1), pp. 308-331. ISSN 0969-9988

Li, Y; Lu, Y; Li, D and Ma, L (2015) Metanetwork analysis for project task assignment. Journal of Construction Engineering and Management, 141(12): 04015044, ISSN 0733-9364

Li, Y and Ning, Y (2022) Mitigating opportunistic behaviors in consulting projects: Evidence from the outsourced architectural and engineering design. Journal of Construction Engineering and Management, 148(7): 04022044, ISSN 0733-9364

Li, Y and Taylor, T R B (2014) Modeling the impact of design rework on transportation infrastructure construction project performance. Journal of Construction Engineering and Management, 140(9): 04014044, ISSN 0733-9364

Li, Y Y; Chen, P H; Chew, D A S; Teo, C C and Ding, R G (2011) Critical project management factors of AEC firms for delivering green building projects in Singapore. Journal of Construction Engineering and Management, 137(12), pp. 1153-1163. ISSN 0733-9364

Liang, C J; Wang, X; Kamat, V R and Menassa, C C (2021) Human-robot collaboration in construction: Classification and research trends. Journal of Construction Engineering and Management, 147(10): 03121006, ISSN 0733-9364

Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.

Liang, Q and Li, Q (2021) Investigating the influence of facilities management factors in community area on quality of life of the elderly. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Liang, R; Xue, Z and Chong, H Y (2023) Risk evaluation of logistics park projects' lifecycle during the COVID-19 pandemic: Failure mode and effects analysis. Journal of Construction Engineering and Management, 149(1): 04022153, ISSN 0733-9364

Liang, Y (2006) Integrated IT systems for construction site management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liang, Y and Ashuri, B (2022) Challenges and enabling features of small and medium infrastructure public-private partnerships (p3s): A case study of the US P3 infrastructure market. Engineering, Construction and Architectural Management, 29(1), pp. 49-71. ISSN 0969-9988

Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364

Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364

Liang, Y and Xu, Z (2025) Intelligent inspection of appearance quality for precast concrete components based on improved YOLO model and multi-source data. Engineering, Construction and Architectural Management, 32(3), pp. 1691-1714. ISSN 0969-9988

Liao, L (2018) Building information modeling-based process transformation to improve productivity in the Singapore construction industry. PhD thesis, National University of Singapore, Singapore.

Liao, L; Teo, E A L and Low, S P (2017) A project management framework for enhanced productivity performance using building information modelling. Construction Economics and Building, 17(3), pp. 1-26. ISSN 2204-9029

Liao, L; Teo Ai Lin, E and Low, S P (2020) Assessing building information modeling implementation readiness in building projects in Singapore: A fuzzy synthetic evaluation approach. Engineering, Construction and Architectural Management, 27(3), pp. 700-724. ISSN 0969-9988

Liao, P C; Shi, H; Su, Y and Luo, X (2018) Development of data-driven influence model to relate the workplace environment to human error. Journal of Construction Engineering and Management, 144(3): 04018003, ISSN 0733-9364

Lim, J N (2007) Stimulating construction innovation in Singapore by developing the national system of innovation. PhD thesis, National University of Singapore, Singapore.

Lim, J N; Schultmann, F and Ofori, G (2010) Tailoring competitive advantages derived from innovation to the needs of construction firms. Journal of Construction Engineering and Management, 136(5), pp. 568-580. ISSN 0733-9364

Lim, L J W and Ling, F Y Y (2012) Human resource practices of contractors that lead to job satisfaction of professional staff. Engineering, Construction and Architectural Management, 19(1), pp. 101-118. ISSN 0969-9988

Lim, M S H (2022) The practice of DFS review in Singapore: Industry and organisational level interventions. PhD thesis, National University of Singapore, Singapore.

Lim, Soon Kam (2009) Framework and processes for enhancing sustainability deliverables in Australian road infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Lim, T (2009) Essence of time in construction contracts. Construction Economics and Building, 9(2), pp. 1-6. ISSN 2204-9029

Lin, C L; Chiang, W H; Weng, Y S and Wu, H P (2023) Assessing the anthropogenic carbon emission of wooden construction: An LCA study. Building Research & Information, 51(2), pp. 138-157. ISSN 0961-3218

Lin, G (2009) Measuring the performance of value management studies in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lin, G; Shen, G Q; Sun, M and Kelly, J (2011) Identification of key performance indicators for measuring the performance of value management studies in construction. Journal of Construction Engineering and Management, 137(9), pp. 698-706. ISSN 0733-9364

Lin, J J and Golparvar-Fard, M (2021) Visual and virtual production management system for proactive project controls. Journal of Construction Engineering and Management, 147(7): 2045, ISSN 0733-9364

Lin, L Y (2015) Modelling of organizational capabilities, innovation activities and performance of small and medium sized construction firms. PhD thesis, University of Malaya, Malaysia.

Lin, S L (2021) Environmental risk and delay analysis: Lessons learned from the california high speed rail project. DEnv thesis, University of California, Los Angeles, USA.

Lind, H and Borg, L (2010) Service-led construction: Is it really the future? Construction Management and Economics, 28(11), pp. 1145-1153. ISSN 1466433X

Lindhard, S and Larsen, J K (2016) Identifying the key process factors affecting project performance. Engineering, Construction and Architectural Management, 23(5), pp. 657-673. ISSN 0969-9988

Lindhard, S and Wandahl, S (2014) Exploration of the reasons for delays in construction. International Journal of Construction Management, 14(1), pp. 36-44. ISSN 1562-3599

Lines, B (2014) Action research approach to implementation of APDMS within owner organizations strategic management and overcoming resistance to change in the AEC industry. PhD thesis, Arizona State University, USA.

Lines, B C; Perrenoud, A; Sullivan, K T and Smithwick, J (2015) Implementing new project delivery strategies: Development of a web-based multimedia tool to support owner project team training. International Journal of Construction Education and Research, 11(2), pp. 140-160. ISSN 1557-8771

Lines, B C and Ravi Kumar, G G (2018) Developing more competitive proposals: Relationship between contractor qualifications-based proposal content and owner evaluation scores. Journal of Construction Engineering and Management, 144(5): 04018030, ISSN 0733-9364

Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771

Lines, B C; Sullivan, K T and Wiezel, A (2016) Support for organizational change: Change-readiness outcomes among AEC project teams. Journal of Construction Engineering and Management, 142(2): 04015062, ISSN 0733-9364

Ling, F Y Y (2003) Managing the implementation of construction innovations. Construction Management and Economics, 21(6), pp. 635-649. ISSN 01446193

Ling, F Y Y (2004) Key determinants of performance of design-bid-build projects in Singapore. Building Research & Information, 32(2), pp. 128-139. ISSN 0961-3218

Ling, F Y Y (2018) International comparison of performance of public projects. Built Environment Project and Asset Management, 8(3), pp. 281-292. ISSN 2044-124X

Ling, F Y Y; Chan, S L; Chong, E and Ee, L P (2004) Predicting performance of design-build and design-bid-build projects. Journal of Construction Engineering and Management, 130(1), pp. 75-83. ISSN 0733-9364

Ling, F Y Y and Hien, M B T (2014) Boosting project outcomes through goal alignment: A case study of Vietnam. Construction Economics and Building, 14(2), pp. 73-86. ISSN 2204-9029

Ling, F Y Y; Ibbs, C W and Hoo, W Y (2006) Determinants of international architectural, engineering, and construction firms' project success in China. Journal of Construction Engineering and Management, 132(2), pp. 206-214. ISSN 0733-9364

Ling, F Y Y; Ke, Y; Kumaraswamy, M M and Wang, S (2014) Key relational contracting practices affecting performance of public construction projects in China. Journal of Construction Engineering and Management, 140(1): 04013034, ISSN 0733-9364

Ling, F Y Y and Khoo, W W (2016) Improving relationships in project teams in Malaysia. Built Environment Project and Asset Management, 6(3), pp. 284-301. ISSN 2044-124X

Ling, F Y Y and Kumaraswamy, M M (2005) The role of trust in team integration: A survey of contractors, consultants and clients in Singapore. Journal of Construction Procurement, 11(1),

Ling, F Y Y; Low, S P; Wang, S and Egbelakin, T (2008) Models for predicting project performance in China using project management practices adopted by foreign AEC firms. Journal of Construction Engineering and Management, 134(12), pp. 983-990. ISSN 0733-9364

Ling, F Y Y and Ng, W T (2011) Boosting performance of road infrastructure: A case study based on motorist satisfaction in Singapore. Built Environment Project and Asset Management, 1(2), pp. 211-225. ISSN 2044-124X

Ling, F Y Y and Sim, W X L (2025) Mediating role of vocational interest in the relationship between personality and job satisfaction: Insights from cost engineers. Journal of Construction Engineering and Management, 151(6): 04025057, ISSN 0733-9364

Ling, F Y Y and Teh, K K L (2025) Effective leadership styles to boost employees' work outcomes during COVID-19 pandemic: Perspective of facilities management professionals. Engineering, Construction and Architectural Management, 32(6), pp. 3857-3882. ISSN 0969-9988

Ling, F Y Y and Tran, H B T (2012) Ingredients to engender trust in construction project teams in Vietnam. Construction Innovation, 12(1), pp. 43-61. ISSN 1471-4175

Ling, F Y Y and Tran, P Q (2012) Effects of interpersonal relations on public sector construction contracts in Vietnam. Construction Management and Economics, 30(12), pp. 1087-1101. ISSN 1466433X

Lingard, H (2000) The relationship between 'family friendly' employment practices and the well-being and satisfaction of white collar employees in the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Lingard, H; Cooke, T; Blismas, N and Wakefield, R (2013) Prevention through design: Trade-offs in reducing occupational health and safety risk for the construction and operation of a facility. Built Environment Project and Asset Management, 3(1), pp. 7-23. ISSN 2044-124X

Lingard, H; Francis, V and Turner, M (2010) It’s about time: The impact of fluctating work hours on the work-life balance of project-based construction workers. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Lingard, H and Lin, J (2004) Career, family and work environment determinants of organizational commitment among women in the Australian construction industry. Construction Management and Economics, 22(4), pp. 409-420. ISSN 01446193

Lingard, H; Pirzadeh, P; Blismas, N; Wakefield, R and Kleiner, B (2014) Exploring the link between early constructor involvement in project decision-making and the efficacy of health and safety risk control. Construction Management and Economics, 32(9), pp. 918-931. ISSN 01446193

Lingard, H; Saunders, L; Pirzadeh, P; Blismas, N; Kleiner, B and Wakefield, R (2015) The relationship between pre-construction decision-making and the effectiveness of risk control: Testing the time-safety influence curve. Engineering, Construction and Architectural Management, 22(1), pp. 108-124. ISSN 0969-9988

Lingard, H and Sublet, A (2002) The impact of job and organizational demands on marital or relationship satisfaction and conflict among Australian civil engineers. Construction Management and Economics, 20(6), pp. 507-521. ISSN 01446193

Lingard, H; Zhang, R P; Blismas, N; Wakefield, R and Kleiner, B (2015) Are we on the same page? Exploring construction professionals' mental models of occupational health and safety. Construction Management and Economics, 33(1), pp. 73-84. ISSN 01446193

Liston, K M (2009) A mediated interaction approach to study the role of media use in team interaction. PhD thesis, Stanford University, USA.

Litchfield, K I (2014) Characterizing and understanding the growing population of socially engaged engineers through engineers without borders-USA. PhD thesis, University of Colorado at Boulder, USA.

Liu, W; Chan, A P C; Debrah, C and Darko, A (2026) Evaluating project success for emergency healthcare infrastructure based on the cloud matter-element model. Journal of Construction Engineering and Management, 152(5): 04026038, ISSN 0733-9364

Liu, W; Feng, Z and Luo, X (2026) Study of a risk-sharing mechanism in a prefabricated building project supply chain. Journal of Construction Engineering and Management, 152(6): 04026063, ISSN 0733-9364

Liu, A M M and Fang, Z (2006) A power-based leadership approach to project management. Construction Management and Economics, 24(5), pp. 497-507. ISSN 1466433X

Liu, Anita Mei-mai (1995) Evaluation of the outcome of construction projects. PhD thesis, University of Hong Kong, Hong Kong.

Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G and Zou, Y (2024) Understanding social interaction and physiological patterns in nonlean and Last Planner system-based project teams: A comparative study using immersive virtual reality. Journal of Construction Engineering and Management, 150(10): 04024131, ISSN 0733-9364

Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G; Zou, Y and Davies, R (2024) Integrating the last planner system and immersive virtual reality: Exploring the social mechanisms produced by using LPS in projects. Journal of Construction Engineering and Management, 150(7): 04024070, ISSN 0733-9364

Liu, C; González, V A; Lee, G; Davies, R; Cabrera-Guerrero, G and Zou, Y (2025) Assessing an immersive virtual reality-based simulation game capability to study the social mechanisms enabled by the Last Planner system in projects. Journal of Construction Engineering and Management, 151(9): 04025111, ISSN 0733-9364

Liu, D; Lu, W and Niu, Y (2023) Isomorphic pressures to catalyze innovation diffusion in construction project-based organizations: Identification of source factors. Journal of Construction Engineering and Management, 149(2): 4022170, ISSN 0733-9364

Liu, D; Sun, J; Zhong, D and Song, L (2012) Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9), pp. 1085-1094. ISSN 0733-9364

Liu, G; Ma, Z; Li, J; Li, S; Zhou, X and Song, Y (2024) Framework of digital lean construction and implementation of its management platform for the construction phase. Journal of Construction Engineering and Management, 150(6): 04024051, ISSN 0733-9364

Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liu, H; Han, S and Zhu, Z (2023) Blockchain technology toward smart construction: Review and future directions. Journal of Construction Engineering and Management, 149(3): 03123002, ISSN 0733-9364

Liu, H; Song, J and Wang, G (2020) Development of a tool for measuring building information modeling (BIM) user satisfaction: method selection, scale development and case study. Engineering, Construction and Architectural Management, 27(9), pp. 2409-2427. ISSN 0969-9988

Liu, J (2024) Value co-creation for public–private partnership (PPP) projects in China: A holistic framework from antecedents to outcomes of interaction. PhD thesis, University of Technology Sydney, Australia.

Liu, J; Gao, R; Cheah, C Y J and Luo, J (2017) Evolutionary game of investors' opportunistic behaviour during the operational period in PPP projects. Construction Management and Economics, 35(3), pp. 137-153. ISSN 01446193

Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364

Liu, Jiani (2014) Developing a life cycle assessment model for measuring sustainable performance of buildings in China. PhD thesis, University of Technology Sydney, Australia.

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, K; Hwang, B G; Jia, J; Man, Q and Zhang, S (2025) Shaping online and offline informal learning networks in off-site construction projects: A proximity perspective. Engineering, Construction and Architectural Management, 32(2), pp. 939-966. ISSN 0969-9988

Liu, K; Liu, Y and Kou, Y (2025) External drivers of inter-organizational collaboration in megaproject: A perspective based on project governance. Engineering, Construction and Architectural Management, 32(5), pp. 2920-2941. ISSN 0969-9988

Liu, L; Wang, X and Sheng, Z (2012) Achieving ambidexterity in large, complex engineering projects: A case study of the sutong bridge project. Construction Management and Economics, 30(5), pp. 399-409. ISSN 1466433X

Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.

Liu, S (2016) An investigation of how information processing impacts boundary spanning activities in managing construction design changes from the perspective of contractors. PhD thesis, University of Hong Kong, Hong Kong.

Liu, T and Wilkinson, S (2011) Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation, 11(4), pp. 452-469. ISSN 1471-4175

Liu, W; Chan, A P C; Chan, M W; Darko, A and Oppong, G D (2025) Key performance indicators for hospital planning and construction: A systematic review and meta-analysis. Engineering, Construction and Architectural Management, 32(5), pp. 3375-3406. ISSN 0969-9988

Liu, Xiaoyan (2023) The effects of public-private partnership on innovation and project performance. PhD thesis, University of Sydney, Australia.

Liu, Y (2009) Critical factors for managing project communication among participants at the construction stage. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Liu, Y; Yao, F; Ji, Y; Tong, W; Liu, G; Li, H X and Hu, X (2022) Quality control for offsite construction: Review and future directions. Journal of Construction Engineering and Management, 148(8): 03122003, ISSN 0733-9364

Liu, Z; Lu, Y; Nath, T; Wang, Q; Tiong, R L K and Peh, L L C (2022) Critical success factors for BIM adoption during construction phase: A Singapore case study. Engineering, Construction and Architectural Management, 29(9), pp. 3267-3287. ISSN 0969-9988

Livesey, P V (2020) Further insights by project managers into the problems in project management. Construction Economics and Building, 20(4), pp. 137-153. ISSN 2204-9029

Lo, T Y J (2021) Innovation management in the construction industry: Innovation performance indicators for AECOO organizations. PhD thesis, Stanford University, USA.

Lo Prete, Matteo (2013) Synergies between management and valorization of cultural heritage through models based on BIM technologies. PhD thesis, Politecnico di Milano, Italy.

Lomas, K J; Cook, M J and Short, C A (2009) Commissioning hybrid advanced naturally ventilated buildings: A US case study. Building Research & Information, 37(4), pp. 397-412. ISSN 0961-3218

London, K and Singh, V (2013) Integrated construction supply chain design and delivery solutions. Architectural Engineering and Design Management, 9(3), pp. 135-157. ISSN 1745-2007

London, K A and Cadman, K (2009) Impact of a fragmented regulatory environment on sustainable urban development design management. Architectural Engineering and Design Management, 5(1-2), pp. 5-23. ISSN 1745-2007

Long, P W (2021) A conceptual framework for sharing knowledge and information between facility management/operations and building design teams. PhD thesis, University of Salford, UK.

Longstaff, D and Johansen, E (2009) Mobile phones in project management: The pendulum of professionalism. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Lonsdale, J and Lucas, C (2019) The influence of key performance indicators on relationship and performance of joint venture construction projects in the UK. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Loosemore, M and Bridgeman, J (2017) Corporate volunteering in the construction industry: Motivations, costs and benefits. Construction Management and Economics, 35(10), pp. 641-653. ISSN 01446193

Loosemore, M; Higgon, D and Osborne, J (2020) Managing new social procurement imperatives in the Australian construction industry. Engineering, Construction and Architectural Management, 27(10), pp. 3075-3093. ISSN 0969-9988

Lopes, Carmen Silvia Gonçalves (2016) Active learning in training engineer: The influence of the use of learning strategies for skills based on a systemic view. PhD thesis, Universidade de São Paulo, Brazil.

Lopez Del Puerto, C and Shane, J S (2014) Keys to success in megaproject management in Mexico and the United States: Case study. Journal of Construction Engineering and Management, 140(4): B5013001, ISSN 0733-9364

Lord, A M (1989) An investigation into the role of the project manager: A comparative study of project leadership, organisation and culture in UK defence contractors and engineering constructors. PhD thesis, Henley Business School, UK.

Lorterapong, P and Ussavadilokrit, M (2013) Construction scheduling using the constraint satisfaction problem method. Journal of Construction Engineering and Management, 139(4), pp. 414-422. ISSN 0733-9364

Lou, E C W (2012) E-readiness in construction: readiness of UK construction organisations. PhD thesis, University of Salford, UK.

Lou, E C W; Lee, A and Mathison, G (2011) Recapitulation of corporate social responsibility (CSR) for construction SMEs in the UK. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Louis, J and Dunston, P S (2017) Methodology for real-time monitoring of construction operations using finite state machines and discrete-event operation models. Journal of Construction Engineering and Management, 143(3): 04016106, ISSN 0733-9364

Love, P; Edwards, D and Wood, E (2011) Loosening the Gordian knot: The role of emotional intelligence in construction. Engineering, Construction and Architectural Management, 18(1), pp. 50-65. ISSN 0969-9988

Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.

Love, P E D; Davis, P R; Chevis, R and Edwards, D J (2011) Risk/reward compensation model for civil engineering infrastructure alliance projects. Journal of Construction Engineering and Management, 137(2), pp. 127-136. ISSN 0733-9364

Love, P E D; Leonard, D; Matthews, J; Ford, G and Fang, W (2024) Setting a course to validate and operationalize quality II in construction. Journal of Construction Engineering and Management, 150(12): 06024002, ISSN 0733-9364

Love, P E D; Matthews, J and Fang, W (2020) Rework in construction: A focus on error and violation. Journal of Construction Engineering and Management, 146(9): 06020001, ISSN 0733-9364

Love, P E D and Smith, J (2016) Toward error management in construction: Moving beyond a zero vision. Journal of Construction Engineering and Management, 142(11): 04016058, ISSN 0733-9364

Love, P E D and Smith, J (2016) Error management: Implications for construction. Construction Innovation, 16(4), pp. 418-424. ISSN 1471-4175

Love, P E D and Teo, P (2017) Statistical analysis of injury and nonconformance frequencies in construction: Negative binomial regression model. Journal of Construction Engineering and Management, 143(8): 05017011, ISSN 0733-9364

Love, P E D; Teo, P and Morrison, J (2018) Revisiting quality failure costs in construction. Journal of Construction Engineering and Management, 144(2): 05017020, ISSN 0733-9364

Love, P E D; Teo, P; Morrison, J and Grove, M (2016) Quality and safety in construction: Creating a no-harm environment. Journal of Construction Engineering and Management, 142(8): 5016006, ISSN 0733-9364

Love, P E D; Zhou, J; Matthews, J; Sing, C-P and Carey, B (2015) A systems information model for managing electrical, control, and instrumentation assets. Built Environment Project and Asset Management, 5(3), pp. 278-289. ISSN 2044-124X

Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida. PhD thesis, University of Florida, USA.

Low, S P (2012) Strategic development of the built environment through international construction, quality and productivity management. DSc thesis, University of Birmingham, UK.

Low, W W; Wong, K S and Lee, J L (2022) Cost-influencing risk factors in infrastructure projects on soft soils. International Journal of Construction Management, 22(2), pp. 229-241. ISSN 1562-3599

Loy, W. W.; Belek Fialho Teixeira, M. and Franzè, A. P. (2026) Ar-guided modular robotic bricklaying: A proof-of-concept system for human-in-the-loop construction workflows. Construction Innovation, ISSN 1471-4175

Lu, Z.; Jin, X.; Osei-Kyei, R. and Senaratne, S. (2026) A conceptual framework for realising ESG-centred project value in modern methods of construction. Construction Innovation, pp. 1-19. ISSN 1471-4175

Lu, H and Juan, Y K (2023) Applying the DQI-based kano model and QFD to develop design strategies for visitor centers in national parks. Architectural Engineering and Design Management, 19(3), pp. 215-232. ISSN 1745-2007

Lu, M and Anson, M (2004) Establish concrete placing rates using quality control records from Hong Kong building construction projects. Journal of Construction Engineering and Management, 130(2), pp. 216-224. ISSN 0733-9364

Lu, M; Anson, M; Tang, S L and Ying, Y C (2003) Hkconsim: A practical simulation solution to planning concrete plant operations in Hong Kong. Journal of Construction Engineering and Management, 129(5), pp. 547-554. ISSN 0733-9364

Lu, N and Liska, R W (2008) Designers' and general contractors' perceptions of offsite construction techniques in the united state construction industry. International Journal of Construction Education and Research, 4(3), pp. 177-188. ISSN 1557-8771

Lu, S and Sexton, M G (2009) The establishment and growth of a high technology firm: Interim results from an exploratory longitudinal case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Lu, W (2015) Collaboration in BIM-enabled projects: a socio-technical perspective. PhD thesis, University of Hong Kong, Hong Kong.

Lu, W; Peng, Y; Shen, Q and Li, H (2013) Generic model for measuring benefits of BIM as a learning tool in construction tasks. Journal of Construction Engineering and Management, 139(2), pp. 195-203. ISSN 0733-9364

Lu, W; Wu, L; Zhao, R; Li, X and Xue, F (2021) Blockchain technology for governmental supervision of construction work: Learning from digital currency electronic payment systems. Journal of Construction Engineering and Management, 147(10): 02148, ISSN 0733-9364

Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.

Lu W, Z D R S (2013) BIM collaboration: A conceptual model and its characteristics. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Luambano, C; Kavishe, N; Zulu, S and Chileshe, N (2023) Drivers and challenges of vertical integration in the Tanzanian construction industry. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Lucas, J; Gajjar, D; Loadholt, G and Davis, D (2023) Roofing distributor employee perception: Workforce attraction/retention and need. Construction Economics and Building, 23(3-4), pp. 3-24. ISSN 2204-9029

Lucas, J D (2012) An integrated BIM framework to support facility management in healthcare environments. PhD thesis, Virginia Tech, USA.

Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(2), pp. 127-136. ISSN 0969-9988

Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work. PhD thesis, University of Michigan, USA.

Lundgren, R; Kyrö, R and Olander, S (2024) The lifecycle impact and value capture of circular business models in the built environment. Construction Management and Economics, 42(6), pp. 527-544. ISSN 01446193

Luo, J (1998) The transitional construction industry and sino-foreign construction joint ventures in the P.R. Of China. PhD thesis, University of Manchester, UK.

Luo, J; Zadeh, P and Staub-French, S (2024) Ontology-based design features for representing constructability in architectural design: Toward BIM in off-site construction. Journal of Construction Engineering and Management, 150(10): 05024010, ISSN 0733-9364

Luo, Y (2008) Decision support for prefabrication strategy selection on building systems. PhD thesis, Pennsylvania State University, USA.

Lv, X and El-Gohary, N M (2016) Discovering context-specific integration practices for integrating NEPA into statewide and metropolitan project planning processes. Journal of Construction Engineering and Management, 142(11): 04016056, ISSN 0733-9364

Lynch, T D (1996) A transaction cost framework for evaluating construction project organizations. PhD thesis, Pennsylvania State University, USA.

Lützkendorf, T and Lorenz, D (2005) Sustainable property investment: Valuing sustainable buildings through property performance assessment. Building Research & Information, 33(3), pp. 212-234. ISSN 0961-3218

Ma, S; Li, Z and Zhang, J (2025) A multi-attribute group decision-making framework for site selection of waste-to-energy project considering public participation. Engineering, Construction and Architectural Management, 32(12), pp. 8326-8359. ISSN 0969-9988

Ma, C (2015) Stakeholder risk attitudes in safety risk management : exploring the relationship between risk attitude and safety risk management performance. PhD thesis, University of Hong Kong, Hong Kong.

Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364

Ma, G; Jia, J; Ding, J; Wu, M and Wang, D (2021) Examining the impact of social media use on project management performance: Evidence from construction projects in China. Journal of Construction Engineering and Management, 147(3): 04021004, ISSN 0733-9364

Ma, G; Jiang, S and Jia, J (2022) Investigating the adoption of social media in the construction industry: Empirical evidence from project teams in China. Engineering, Construction and Architectural Management, 29(10), pp. 3948-3969. ISSN 0969-9988

Ma, L and Fu, H (2020) Exploring the influence of project complexity on the mega construction project success: A qualitative comparative analysis (QCA) method. Engineering, Construction and Architectural Management, 27(9), pp. 2429-2449. ISSN 0969-9988

Ma, P (2023) A sociomateriality view of boundary spanning in BIM-enabled early facilities management involvement. PhD thesis, University of Hong Kong, Hong Kong.

Ma, Q; Cheung, S O and Li, S (2023) Optimum risk/reward sharing framework to incentivize integrated project delivery adoption. Construction Management and Economics, 41(6), pp. 519-535. ISSN 01446193

Ma, Y (2011) A semiotic framework for buildings performance assessment. PhD thesis, University of Reading, UK.

Ma, Z; Gu, J; Zhao, Q; Yang, M; Qian, C; He, M and Hei, X (2025) Intelligent optimization of blasting parameters in railroad tunnels based on blasting quality control. Journal of Construction Engineering and Management, 151(8): 04025094, ISSN 0733-9364

Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions. PhD thesis, University of Bath, UK.

Mace, B K (2001) A production control model for commercial construction. PhD thesis, Pennsylvania State University, USA.

Madson, K M; Franz, B; Molenaar, K R and Okudan Kremer, G (2020) Strategic development of flexible manufacturing facilities. Engineering, Construction and Architectural Management, 27(6), pp. 1299-1314. ISSN 0969-9988

Maduka, N S (2017) The role of knowledge management in assisting key stakeholders in making informed decisions in delivering sustainable retrofitted building projects. PhD thesis, Northumbria University, UK.

Madunic, M (2008) Choosing a project team: The effects of interdependence and prior transacting in engineering, procurement and construction (EPC) projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Madushika, W H S; Perera, B A K S; Ekanayake, B J and Shen, G Q P (2020) Key performance indicators of value management in the Sri Lankan construction industry. International Journal of Construction Management, 20(2), pp. 157-168. ISSN 1562-3599

Magent, C S (2005) A process and competency-based approach to high performance building design. PhD thesis, Pennsylvania State University, USA.

Magent, C S; Korkmaz, S; Klotz, L E and Riley, D R (2009) A design process evaluation method for sustainable buildings. Architectural Engineering and Design Management, 5(1-2), pp. 62-74. ISSN 1745-2007

Magub, A T (2006) Experiences of the phenomenon of internet use for information sharing on construction projects and skills set identification for effective project participation. PhD thesis, Queensland University of Technology, Australia.

Mah, D; Manrique, J D; Yu, H; Al-Hussein, M and Nasseri, R (2011) House construction CODN2/DN footprint quantification: A BIM approach. Construction Innovation, 11(2), pp. 161-178. ISSN 1471-4175

Mah, D E (2011) Framework for rating the sustainability of the residential construction practice. PhD thesis, University of Alberta, Canada.

Mahalingam, A; Yadav, A K and Varaprasad, J (2015) Investigating the role of lean practices in enabling BIM adoption: Evidence from two Indian cases. Journal of Construction Engineering and Management, 141(7): 5015006, ISSN 0733-9364

Mahamadu, A M; Mahdjoubi, L and Booth, C A (2014) Determinants of building information modelling (BIM) acceptance for supplier integration: A conceptual model. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Mahamadu, A-M; Mahdjoubi, L and Booth, C A (2017) Critical BIM qualification criteria for construction pre-qualification and selection. Architectural Engineering and Design Management, 13(5), pp. 326-343. ISSN 1745-2007

Mahamid, I (2013) Common risks affecting time overrun in road construction projects in Palestine: Contractors' perspective. Construction Economics and Building, 13(2), pp. 45-53. ISSN 2204-9029

Mahamivanan, H; Ghassemi, N; Tayarani Darbandy, M; Shoeibi, A; Hussain, S; Nasirzadeh, F; Alizadehsani, R; Nahavandi, D; Khosravi, A and Nahavandi, S (2025) Material recognition for construction quality monitoring using deep learning methods. Construction Innovation, 25(3), pp. 732-760. ISSN 1471-4175

Mahato, B K and Ogunlana, S O (2011) Conflict dynamics in a dam construction project: A case study. Built Environment Project and Asset Management, 1(2), pp. 176-194. ISSN 2044-124X

Mahdavian, A and Shojaei, A (2020) Hybrid genetic algorithm and constraint-based simulation framework for building construction project planning and control. Journal of Construction Engineering and Management, 146(12): 04020140, ISSN 0733-9364

Mahdi, I M; Al-Reshaid, K and Fereig, S M (2006) Optimum house delivery decision model from the government's and recipients' point-of-view. Engineering, Construction and Architectural Management, 13(4), pp. 413-430. ISSN 0969-9988

Mahdiputra, S; Giddings, B; Hogg, K and Daws, M (2005) Investigating learning in construction organizations. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms. PhD thesis, Heriot-Watt University, UK.

Mahmoud, A S; Sanni-Anibire, M O; Hassanain, M A and Ahmed, W (2019) Key performance indicators for the evaluation of academic and research laboratory facilities. International Journal of Building Pathology and Adaptation, 37(2), pp. 208-230. ISSN 23984708

Mahmoud, S Y and Scott, S (2002) The development and use of key performance indicators by the UK construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Mahmud, Bello Zailani (2025) Equity-driven workforce development initiatives through long-term strategic partnerships for the construction and maintenance of green stormwater infrastructure. DEng thesis, Morgan State University (Maryland), USA.

Majumdar, T (2024) Pmc: A classification of production metrics found useful by AEC professionals. PhD thesis, Stanford University, USA.

Mak, Wae Hoa Jonathan (2019) The design of resilient engineering infrastructure systems. PhD thesis, University of Cambridge, UK.

Makabate, C T (2021) Investigating the adoption of building information modelling (BIM) within the small medium enterprises (SMEs) in contracting and consulting organisatios in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Makahaube, J S (2020) Performance measure methodology of project management practices in local government agencies. PhD thesis, University of Texas at El Paso, USA.

Makarfi, U and Udeaja, C (2019) To formulate a conceptual model for innovation: Reframing theoretical constructs of BIM adoption within SME organisations. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Malla, V and Delhi, V S K (2022) Determining interconnectedness of barriers to interface management in large construction projects. Construction Economics and Building, 22(2), pp. 69-101. ISSN 2204-9029

Mallawaarachchi, V T; Senanayake, S M A H; Disaratna, V and Perera, B A K S (2024) Application of subcontracting as a quality improvement tool for building constructions in Sri Lanka. International Journal of Construction Management, 24(1), pp. 44-56. ISSN 1562-3599

Mallon, J C and Mulligan, D E (1993) Quality function deployment: a system for meeting customers' needs. Journal of Construction Engineering and Management, 119(3), pp. 516-531. ISSN 0733-9364

Malmberg, F (2007) Introduction of a new form of quote evaluation: A case study in southern Sweden. Construction Management and Economics, 25(6), pp. 661-669. ISSN 1466433X

Malone, E K (2010) Work-life balance and organizational commitment of women in construction in the United States. PhD thesis, University of Florida, USA.

Malone, E K and Issa, R R A (2014) Predictive models for work-life balance and organizational commitment of women in the U.S. Construction industry. Journal of Construction Engineering and Management, 140(3): 4013064, ISSN 0733-9364

Maloney, W F (2002) Construction product/service and customer satisfaction. Journal of Construction Engineering and Management, 128(6), pp. 522-529. ISSN 0733-9364

Maloney, W F (2003) Labor-management cooperation and customer satisfaction. Journal of Construction Engineering and Management, 129(2), pp. 165-172. ISSN 0733-9364

Maloney, W F and McFillen, J M (1985) Valence of and satisfaction with job outcomes. Journal of Construction Engineering and Management, 111(1), pp. 53-73. ISSN 0733-9364

Maloney, W F and McFillen, J M (1987) Influence of foremen on performance. Journal of Construction Engineering and Management, 113(3), pp. 399-415. ISSN 0733-9364

Maloney, W F and McFillen, J M (1987) Motivational impact of work crews. Journal of Construction Engineering and Management, 113(2), pp. 208-221. ISSN 0733-9364

Maloney, W F and McFillen, J M (1987) Worker perceptions of contractor behavior. Journal of Construction Engineering and Management, 113(3), pp. 416-426. ISSN 0733-9364

Mandujano Rodríguez, M G (2016) A method to identify virtual design and construction implementation strategies from a lean construction perspective. DEng thesis, Pontificia Universidad Catolica de Chile, Chile.

Manewa, R M A S (2012) Economic considerations for adaptability in buildings. PhD thesis, Loughborough University, UK.

Mangezi, W (2019) Red tape in upgrading of informal settlements in Nelson Mandela Bay. PhD thesis, Nelson Mandela University, South Africa.

Mani, S.; Karunasena, G.; Hosseini, M. R. and Hasan, A. (2026) Building circularity performance model: A weighted multi-level assessment framework aligned with ISO standards. Smart and Sustainable Built Environment, ISSN 2046-6099

Mannarino, J A (2001) Evaluation of the construction management delivery system and establishing a model for selection: A qualitative approach. PhD thesis, State University of New York at Buffalo, USA.

Manoliadis, O G; Pantouvakis, J P and Christodoulou, S (2009) Improving qualifications-based selection by use of the fuzzy Delphi method. Construction Management and Economics, 27(4), pp. 373-384. ISSN 1466433X

Manowong, E and Ogunlana, S O (2006) Public hearings in Thailand's infrastructure projects: Effective participations? Engineering, Construction and Architectural Management, 13(4), pp. 343-363. ISSN 0969-9988

Mansell, P R (2021) Measuring infrastructure projects sustainable development goals impact (MISI). PhD thesis, London South Bank University, UK.

Mansour, H; Aminudin, E; Omar, B and Al-Sarayreh, A (2022) Development of an impact-on-performance index (ipi) for construction projects in Malaysia: A Delphi study. International Journal of Construction Management, 22(11), pp. 2003-2012. ISSN 1562-3599

Mansouri, S; Castronovo, F and Akhavian, R (2020) Analysis of the synergistic effect of data analytics and technology trends in the AEC/FM industry. Journal of Construction Engineering and Management, 146(3): 04019113, ISSN 0733-9364

Mante, J (2014) Resolution of construction disputes arising from major infrastructure projects in developing countries: case study of Ghana. PhD thesis, University of Wolverhampton, UK.

Mante, J (2015) Resolving infrastructure-related construction disputes in developing countries: The Ghana experience. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Manu, P; Ankrah, N; Proverbs, D and Suresh, S (2014) The health and safety impact of construction project features. Engineering, Construction and Architectural Management, 21(1), pp. 65-93. ISSN 0969-9988

Manu, P A (2012) An investigation into the accident causal influence of construction project features. PhD thesis, University of Wolverhampton, UK.

Manzoni, B; Morris, P and Smyth, H (2009) Equipping project teams to win tenders: An insight into Italian architecture projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Manzoor, B; Antwi-Afari, M F; Alotaibi, K S; Edwards, D J and Posillico, J J (2025) Critical success factors for implementing digital twin technology in construction projects: A systematic and bibliometric approach. Journal of Construction Engineering and Management, 151(12): 03125008, ISSN 0733-9364

Maqbool, R and Shaji, A (2026) Quantifying the social loafing led productivity issues in architecture, engineering and construction project teams. Engineering, Construction and Architectural Management, 33(1), pp. 620-640. ISSN 0969-9988

Maqsoom, A; Hamad, M; Ashraf, H; Thaheem, M J and Umer, M (2020) Managerial control mechanisms and their influence on project performance: An investigation of the moderating role of complexity risk. Engineering, Construction and Architectural Management, 27(9), pp. 2451-2475. ISSN 0969-9988

Maradza, E N (2015) Adaptation of industry BIM process standards in a large construction firm. PhD thesis, University of Reading, UK.

Marasini, R (2002) An integrated simulation approach for realising efficient stockyard layouts: An application in the precast concrete products industry. PhD thesis, University of Teesside, UK.

Marasini, R and Dawood, N (2006) Innovative managerial control system (IMCS): An application in precast concrete building products industry. Construction Innovation, 6(2), pp. 97-120. ISSN 1471-4175

Marasini, R and Quinnell, P (2010) Investigation of quality management practices in building construction sites in the UK. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Marcos, Micheline Helen Cot (2015) Method of obtaining environmental impact data, during the design development process through use of BIM tool. PhD thesis, Universidade de São Paulo, Brazil.

Mardikoraem, M (2021) Essays on decision problems under uncertainty. PhD thesis, University of Wisconsin - Milwaukee, USA.

Marion, G L C; Saurin, T A and Viana, D D (2025) The cost-benefit of slack in production planning and control in construction projects. Construction Management and Economics, 43(11), pp. 883-900. ISSN 0144-6193

Marisa, A and Yusof, N A (2020) Factors influencing the performance of architects in construction projects. Construction Economics and Building, 20(3), pp. 20-36. ISSN 2204-9029

Mariz, Renato Nunes (2024) Method for applying the work design in construction based on lean thinking. PhD thesis, Universidade Estadual de Campinas, Brazil.

Markkanen, P and Herneoja, A (2024) Constructing a theory-informed workplace design framework: co-design case study for knowledge work environment satisfaction improvement. Building Research & Information, 52(8), pp. 870-886. ISSN 0961-3218

Markovic, P B (2015) Factors that influence project team members to use BIM and IDDs in the construction industry. DM thesis, University of Phoenix, USA.

Marmanillo, O Z (2021) Study of lean and complex adaptive mechanism to regulate the function of production planning and control in construction projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Marocco, M; Cacciaguerra, E and Garofolo, I (2024) An operational framework for implementing digital systems in public administrations' processes in the design phase. Architectural Engineering and Design Management, 20(3), pp. 411-430. ISSN 1745-2007

Marques, Vania de Lourdes (2015) A model for stakeholder management in construction companies. PhD thesis, Universidade Federal Fluminense, Brazil.

Marrana, T C; Silvestre, J D; De Brito, J and Gomes, R (2017) Lifecycle cost analysis of flat roofs of buildings. Journal of Construction Engineering and Management, 143(6): 04017014, ISSN 0733-9364

Marsh, R (2017) Building lifespan: Effect on the environmental impact of building components in a Danish perspective. Architectural Engineering and Design Management, 13(2), pp. 80-100. ISSN 1745-2007

Marshall-Ponting, A J (2006) nD modelling as an enabler of inter-disciplinary thinking among construction industry stakeholders. PhD thesis, University of Salford, UK.

Martin, H; Garner, M; Manewa, A and Chadee, A (2025) Validating the relative importance of technology diffusion barriers– exploring modular construction design-build practices in the UK. International Journal of Construction Education and Research, 21(1), pp. 3-23. ISSN 1557-8771

Martin, H; Lewis, T; Peters, E and Petersen, A (2017) Construction project delivery cloud decisionsupport model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 6-26. ISSN 17514304

Martin, H; Lewis, T M and Petersen, A (2016) Factors affecting the choice of construction project delivery in developing oil and gas economies. Architectural Engineering and Design Management, 12(3), pp. 170-188. ISSN 1745-2007

Martinez, J G; Yeung, T; Sacks, R; Shahaf, Y and Sharoni, L O (2023) Situational awareness in construction using a serious game. Journal of Construction Engineering and Management, 149(3): 04022183, ISSN 0733-9364

Martinez-Miranzo, D.; Rizo-Maestre, C.; Gomez-Donoso, F. and Cazorla, M. (2026) Mixed reality for construction house evaluation and quality assessing. Journal of Construction Engineering and Management, 152(10): 04026173, ISSN 0733-9364

Martins, S S; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Evaluation of 4D BIM tools applicability in construction planning efficiency. International Journal of Construction Management, 22(15), pp. 2987-3000. ISSN 1562-3599

Marwan, A E (2019) Integrating building information modeling to project management consultants' role and practice in UAE. PhD thesis, Heriot-Watt University, UK.

Marx, H J (2011) Key performance indicators measuring contractor satisfaction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175

Marzouk, M and Ashmawy, M M (2021) Assessment of highways concrete and asphalt pavements using superiority inferiority ranking technique. Construction Innovation, 21(2), pp. 259-278. ISSN 1471-4175

Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988

Marzuki, P; Oktavianus, A; Regina, A and Hasiholan, B (2019) Interface problems in change order-challenged projects. Journal of Construction in Developing Countries, 24(2), pp. 1-22. ISSN 1823-6499

Maseko, L and Root, D (2021) Collaborative risk management within the design phase of green buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Masera, M (1999) An innovative planning technique in quality management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Mashamba, T (2024) A system dynamics model to enhance on-time delivery of infrastructure projects within a power utility in South Africa. PhD thesis, University of South Africa, South Africa.

Maslova, S and Burgess, G (2023) Delivering human-centred housing: Understanding the role of post-occupancy evaluation and customer feedback in traditional and innovative social housebuilding in England. Construction Management and Economics, 41(4), pp. 277-292. ISSN 01446193

Masood, R; Roy, K; Gonzalez, V A and Lim, J B P (2024) Ameliorating supply chains of prefabricated housebuilding: An integrated performance framework. Journal of Construction Engineering and Management, 150(6): 04024044, ISSN 0733-9364

Masrom, M D A; Skitmore, M and Bridge, A (2013) Determinants of contractor satisfaction. Construction Management and Economics, 31(7), pp. 761-779. ISSN 1466433X

Mat Noor, Noorsidi Aizuddin (2014) Framework of whole life cycle costing for Malaysian high rise residential property development. PhD thesis, Queensland University of Technology, Australia.

Matarneh, S (2024) Construction disputes causes and resolution methods: A case study from a developing country. Journal of Construction in Developing Countries, 29(1), pp. 139-161. ISSN 1823-6499

Mathew, S A; Tran, D Q and Nguyen, P H D (2021) Evaluation of cost growth factors in design-build highway projects using structural equation modeling. Journal of Construction Engineering and Management, 147(7): 04021070, ISSN 0733-9364

Matipa, W M; Kelliher, D and Keane, M (2004) Contending with the challenges of deploying building product models in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Matipa, W M; Kelliher, D and Keane, M (2009) A strategic view of ICT supported cost management for green buildings in the quantity surveying practice. Journal of Financial Management of Property and Construction, 14(1), pp. 79-89. ISSN 1366-4387

Matoseiro Dinis, F; Rodrigues, R and Pedro da Silva Poças Martins, J (2024) Development and validation of natural user interfaces for semantic enrichment of BIM models using open formats. Construction Innovation, 24(1), pp. 196-220. ISSN 1471-4175

Matsane, Z S-s (2023) An integrated SCM model for collaborative working in construction in South Africa. PhD thesis, University of Johannesburg, South Africa.

Matsumoto, I T; Stapleton, J; Glass, J and Thorpe, T (2005) Use of process maps to develop a management briefing sheet for a design consultancy. Engineering, Construction and Architectural Management, 12(5), pp. 458-469. ISSN 0969-9988

Matthews, J; Tyler, A and Thorpe, A (1996) Pre-construction project partnering: Developing the process. Engineering, Construction and Architectural Management, 3(1-2), pp. 117-131. ISSN 0969-9988

Maveza, Posani (2022) The quality excellence framework: Driving effective quality management practices in infrastructure construction projects. PhD thesis, Queensland University of Technology, Australia.

Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(4), pp. 629-638. ISSN 1562-3599

Mawdesley, M; Hernandez, O and Al-Jibouri, S (2005) A decision making model for infrastructure projects selection in developing countries. Journal of Financial Management of Property and Construction, 10(3), pp. 135-146. ISSN 1366-4387

Maxwell, D and Couper, R (2023) Construction tracking: Implications of logistics data. Construction Innovation, 23(2), pp. 322-339. ISSN 1471-4175

Mayer, Z and Kazakidis, V (2007) Decision making in flexible mine production system design using real options. Journal of Construction Engineering and Management, 133(2), pp. 169-180. ISSN 0733-9364

Mayouf, M and Gilligan, C (2024) Synthesis towards unveiling the complexity underlying underpayment for subcontractors in construction. Journal of Financial Management of Property and Construction, 29(1), pp. 168-192. ISSN 1366-4387

Mazari, M (2014) Studying the parameters involved with modulus-based construction quality control for compaction of unbound pavement layers. PhD thesis, University of Texas at El Paso, USA.

Mazza, M; Pino, M C; Peretti, S; Scolta, K and Mazzarelli, E (2014) Satisfaction level on quality of life post-earthquake rebuilding. International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 6-22. ISSN 1759-5916

Mañelele, I and Muya, M (2008) Risk identification on community-based construction projects in Zambia. Journal of Engineering, Design and Technology, 6(2), pp. 145-161. ISSN 1726-0531

Mbachu, J (2008) Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26(5), pp. 471-484. ISSN 1466433X

Mbachu, J (2011) Sources of contractor's payment risks and cash flow problems in the New Zealand construction industry: Project team's perceptions of the risks and mitigation measures. Construction Management and Economics, 29(10), pp. 1027-1041. ISSN 01446193

Mbachu, J; Egbelakin, T; Rasheed, E O and Shahzad, W M (2017) Influence of key role players on productivity outcomes in the residential building lifecycle. Journal of Engineering, Design and Technology, 15(4), pp. 528-551.

Mbachu, J and Nkado, R (2006) Conceptual framework for assessment of client needs and satisfaction in the building development process. Construction Management and Economics, 24(1), pp. 31-44. ISSN 01446193

Mbachu, J and Nkado, R (2007) Factors constraining successful building project implementation in South Africa. Construction Management and Economics, 25(1), pp. 39-54. ISSN 1466433X

Mbugua, L M (2000) A methodology for evaluating the business performance of UK construction companies. PhD thesis, University of Wolverhampton, UK.

Mbugua, L M; Holt, G D and Olomolaiye, P O (2000) An evaluation of international frameworks for business self-assessment and their application in UK construction. Journal of Financial Management of Property and Construction, 5(3), pp. 135-147. ISSN 1366-4387

McAndrew, S T (2009) Collaborative technologies for mobile workers and virtual project teams. EngD thesis, Loughborough University, UK.

McBride, S M (2022) Toward the microfoundations of interorganizational coordination: The experience of artifacts as a coordination mechanism amid pervasive conflict. PhD thesis, Case Western Reserve University, USA.

McCabe, B; AbouRizk, S and Gavin, J (2002) Time of sampling strategies for asphalt pavement quality assurance. Journal of Construction Engineering and Management, 128(1), pp. 85-89. ISSN 0733-9364

McCandless, D W; Bruce, R D and Gebken, R J (2010) Retention of construction teachers in secondary education. International Journal of Construction Education and Research, 6(2), pp. 104-121. ISSN 1557-8771

McCormack, M; Treloar, G J; Palmowski, L and Crawford, R (2007) Modelling direct and indirect water requirements of construction. Building Research & Information, 35(2), pp. 156-162. ISSN 0961-3218

McDermot, E; Agdas, D; Rodríguez Díaz, C R; Rose, T and Forcael, E (2022) Improving performance of infrastructure projects in developing countries: An ecuadorian case study. International Journal of Construction Management, 22(13), pp. 2469-2483. ISSN 1562-3599

McDermott, P; Khalfan, M and Swan, W (2005) Trust in construction projects. Journal of Financial Management of Property and Construction, 10(1), pp. 19-32. ISSN 1366-4387

McDonald, B and Smithers, M (1998) Implementing a waste management plan during the construction phase of a project: A case study. Construction Management and Economics, 16(1), pp. 71-78. ISSN 01446193

McKeever, T M (2018) How do the perceptions of wages, benefits, and working conditions differ among unionized mechanical construction workers in right-to-work and non-right-to-work states. PhD thesis, Indiana University of Pennsylvania, USA.

McLean, M (2014) A longitudinal analysis of a partial mediation model of employee engagement in a knowledge-intensive firm. PhD thesis, Nottingham Trent University, UK.

McLellan, R (1994) The use of project management procedures by construction contractors. PhD thesis, University of Strathclyde, UK.

McMahon, E; Spillane, J P and Bradley, J G (2023) When enough is not enough! Evaluating the minimum entry requirements for apprenticeships in Ireland. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

McMahon, P; Dawood, N N and Hobbs, B (1998) The utilization of it for managing ground information and optimizing earthworks. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

McMahon, P; Dawood, N N and Hobbs, B (1999) Development of an integrated ground modelling system. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

McWilliam, R C (2002) The evolution of British standards. PhD thesis, University of Reading, UK.

Meacham, B J (2022) Fire performance and regulatory considerations with modern methods of construction. Buildings & Cities, 3(1), pp. 464-487. ISSN 2632-6655

Mead, S P (1999) Communication effectiveness in intranet based construction projects. PhD thesis, Loughborough University, UK.

Meadati, P K (2007) Integration of construction process documents into building information modeling. PhD thesis, University of Nebraska - Lincoln, USA.

Mecca, S and Masera, M (1999) Technical risk analysis in construction by means of fmea methodology. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Medimagh, S and Triki, A (2019) The PPP performance based on the co-creation with customers. Built Environment Project and Asset Management, 9(5), pp. 642-654. ISSN 2044-124X

Medjdoub, B and Chenini, M B (2015) A constraint-based parametric model to support building services design exploration. Architectural Engineering and Design Management, 11(2), pp. 123-136. ISSN 1745-2007

Mega, T (2008) Implications of quality management in the Greek construction industry. PhD thesis, University College London, UK.

Megahed, N (2018) Reflections on studio-based learning: Assessment and critique. Journal of Engineering, Design and Technology, 16(1), pp. 63-80.

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Mehdi Riazi, Salman Riazi (2014) The use of supply chain management to reduce delays as result of pre-construction deficiencies in Malaysian public sector construction projects. PhD thesis, Queensland University of Technology, Australia.

Meier, J R and Russell, J S (2000) Model process for implementing maintainability. Journal of Construction Engineering and Management, 126(6), pp. 440-450. ISSN 0733-9364

Meijer, F and Visscher, H (2017) Quality control of constructions: European trends and developments. International Journal of Law in the Built Environment, 9(2), pp. 143-161. ISSN 1756-1450

Meiling, J (2010) Continuous improvement and experience feedback in off-site construction timber-framed module prefabrication. PhD thesis, Luleå University of Technology, Sweden.

Meiling, J and Sandberg, M (2009) Towards a feedback model for offsite construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Meir, I A; Schwartz, M; Davara, Y and Garb, Y (2019) A window of one's own: A public office post-occupancy evaluation. Building Research & Information, 47(4), pp. 437-452. ISSN 0961-3218

Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Mejlænder-Larsen, Ø (2017) Using a change control system and building information modelling to manage change in design. Architectural Engineering and Design Management, 13(1), pp. 39-51. ISSN 1745-2007

Mejlænder-Larsen, Ø (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(4), pp. 648-667. ISSN 0969-9988

Meldrum, A (2009) Measuring worker engagement as an aspect of health and safety performance in the construction industry: towards a best practice tool. PhD thesis, Glasgow Caledonian University, UK.

Melhem, N N; Maher, R A and Sundermeier, M (2021) Waste-based management of steel reinforcement cutting in construction projects. Journal of Construction Engineering and Management, 147(7): 04021056, ISSN 0733-9364

Mellado, F; Lou, E C W and Becerra, C L C (2020) Synthesising performance in the construction industry: An analysis of performance indicators to promote project improvement. Engineering, Construction and Architectural Management, 27(2), pp. 579-608. ISSN 0969-9988

Memari, S; Kocaturk, T; Lozanovska, M; Andrews, F and Tucker, R (2023) Future proofing for hospital building design: From research to practice. Architectural Engineering and Design Management, 19(6), pp. 681-700. ISSN 1745-2007

Memarian, B (2012) Development of high reliability construction work systems: Lessons from production practices of high performance work crews. PhD thesis, Arizona State University, USA.

Memić, N; Tadayon, A; Ishtiaque, T A; Klakegg, O J; Wondimu, P A and Lædre, O (2025) How to find the optimal time for contractor involvement in infrastructure projects? Engineering, Construction and Architectural Management, 32(11), pp. 7651-7677. ISSN 0969-9988

Memon, F A (2023) Stakeholder engagement in managing scope change during the execution phase of UK construction projects. PhD thesis, University of Bedfordshire, UK.

Memon, S A (2017) Hong Kong relational contracting : an investigation into the attitudes and behaviours of contractors' project teams. PhD thesis, University of Hong Kong, Hong Kong.

Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364

Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Menches, C L (2006) Effect of pre-construction planning on electrical project performance. PhD thesis, University of Wisconsin - Madison, USA.

Menches, C L; Hanna, A S; Nordheim, E V and Russell, J S (2008) Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(8), pp. 855-869. ISSN 01446193

Mendes, J R; Fernando, L; Heineck, M and Vaca, O L (1998) New applications of line of balance on scheduling of multi-storey buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Meng, X (2008) Development of assessment framework for construction supply chain relationships. PhD thesis, University of the West of England, Bristol, UK.

Mengistu, D G and Mahesh, G (2020) Dimensions for improvement of construction management practice in Ethiopian construction industry. Journal of Engineering, Design and Technology, 18(1), pp. 21-39. ISSN 1726-0531

Merchant, A and Bajaj, D (2002) An analysis of the use of the "design-build" project delivery system by interior design firms, and its effectiveness in delivering fit-out projects. Journal of Construction Procurement, 8(1), pp. 17-34. ISSN 1358-9180

Merna, A and Smith, N J (1994) Concession contracts for power generation. Engineering, Construction and Architectural Management, 1(1), pp. 17-27. ISSN 0969-9988

Merna, T (2004) Assessing methods to analyse portfolios of projects and their risks procured by project finance. PhD thesis, University of Manchester, UK.

Mesa, H A (2016) Modeling performance of integrated project delivery systems in design and construction. PhD thesis, University of Colorado at Boulder, USA.

Metham, M and Benjaoran, V (2015) The assessment of greenhouse gas emissions for evaluating actual road construction operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Mhady, A A; Gürgün, A P; Budayan, C and Koc, K (2025) New hybrid models integrating the firefly optimization algorithm with the artificial neural networks and adaptive neuro-fuzzy inference systems to improve estimation at completion. Journal of Construction Engineering and Management, 151(11): 04025160, ISSN 0733-9364

Mhlanga, J; Haupt, T C and Loggia, C (2024) Shaping circular economy in the built environment in Africa. A bibliometric analysis. Journal of Engineering, Design and Technology, 22(2), pp. 613-642. ISSN 1726-0531

Miao, J.; Shen, G. Q.; Fan, H. and Wang, G. (2026) Governing cross-regional collaborative innovation in construction: Evolutionary game insights from complex adaptive systems. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988

Michael Gbolagade, O; Inimbom Walter, I and Emuze, F (2021) Towards sustainability practices deployment in building construction projects in Nigeria. Smart and Sustainable Built Environment, 10(4), pp. 759-780. ISSN 2046-6099

Miers, R J (2001) Critical needs in current construction management education practices: The problem solving process as related to the curriculum. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.

Migliaccio, G C (2007) Planning for strategic change in the project delivery strategy. PhD thesis, University of Texas at Austin, USA.

Migliaccio, G C; Bogus, S M and Cordova-Alvidrez, A A (2014) Continuous quality improvement techniques for data collection in asset management systems. Journal of Construction Engineering and Management, 140(4): B4013008, ISSN 0733-9364

Mikhailova, A (2017) Spatial evolution of a museum building: a case of the State Historical Museum in Moscow. PhD thesis, University of Leicester, UK.

Milberg, C T and Tommelein, I D (2020) Methods for managing tolerance compatibility: Windows in cast-in-place concrete. Journal of Construction Engineering and Management, 146(2), ISSN 0733-9364

Milion, Raphael Negri (2019) Method for managing defects in residential buildings. PhD thesis, Universidade Federal de São Carlos, Brazil.

Miller, J B and Evje, R H (1999) The practical application of delivery methods to project portfolios. Construction Management and Economics, 17(5), pp. 669-677. ISSN 01446193

Miller, S; Haupt, T C and Chileshe, N (2005) Student perceptions of the first year civil engineering course content. Journal of Engineering, Design and Technology, 3(2), pp. 180-189. ISSN 1726-0531

Mills, F T and Glass, J (2009) The construction design manager's role in delivering sustainable buildings. Architectural Engineering and Design Management, 5(1-2), pp. 75-90. ISSN 1745-2007

Mills, G R W; Phiri, M; Erskine, J and Price, A D F (2015) Rethinking healthcare building design quality: An evidence-based strategy. Building Research & Information, 43(4), pp. 499-515. ISSN 0961-3218

Mills, K M (2025) A qualitative descriptive study on job crafting. EdD thesis, Grand Canyon University, USA.

Minchin, R E; Hammons, M I and Ahn, J (2008) A construction quality index for highway construction. Construction Management and Economics, 26(12), pp. 1313-1324. ISSN 1466433X

Minchin, R E and Thomas, H R (2003) Validation of vibration-based onboard asphalt density measuring system. Journal of Construction Engineering and Management, 129(1), pp. 1-7. ISSN 0733-9364

Minchin Jr, R E; Henriquez, N R; King, A M and Lewis, D W (2010) Owners respond: Preferences for task performance, delivery systems, and quality management. Journal of Construction Engineering and Management, 136(3), pp. 283-293. ISSN 0733-9364

Mincks, W R (2016) Career success for construction project managers: A qualitative study of construction project managers coping with stress to complete successful projects. PhD thesis, University of Idaho, USA.

Ming Tam, C and Harris, F (1996) Model for assessing building contractors' project performance. Engineering, Construction and Architectural Management, 3(3), pp. 187-203. ISSN 0969-9988

Miocevic, D; Maricic, M; Arslanagic-Kalajdzic, M and Dedic, G (2025) Emotional intelligence and relational energy in cooperative arrangements in construction projects: Complements or substitutes? Construction Management and Economics, 43(8), pp. 583-598. ISSN 0144-6193

Miraj, P; Wang, T; Koutamanis, A and Chan, P (2025) Organising digital twin in the built environment: A systematic review and research directions on the missing links of use and user perspectives of digital twin in architecture, engineering and construction (AEC) sector. Construction Management and Economics, 43(6), pp. 465-481. ISSN 0144-6193

Mirshekarlou, B R (2018) An investigation of material waste management in prefabricated construction industry and developing an integrated waste management tool. PhD thesis, Middle East Technical University, Turkey.

Mirza, M B; Malik, S; Afzal, N and Ali Kazmi, S J (2025) Examining the impact of conflict resolution, emotional intelligence on project team performance: A study in the construction industry of Pakistan. International Journal of Construction Management, 25(16), pp. 2030-2040. ISSN 1562-3599

Mirzaee, A M and Martek, I (2025) Improving project management "closeout" phase outcomes: Evidence from a large general contractor in Iran using "x-inefficiency theory". Engineering, Construction and Architectural Management, 32(8), pp. 5253-5271. ISSN 0969-9988

Mirzaee, A M; Pourrostam, T; Majrouhi Sardroud, J; Hosseini, M R; Rahnamayiezekavat, P and Edwards, D (2024) Dispute root causes and prevention in Iranian public-private partnership projects: A causal-predictive model. Engineering, Construction and Architectural Management, 31(1), pp. 405-431. ISSN 0969-9988

Mirzaei, M (2018) Cost-effectiveness of outsourcing public architectural/engineering projects in government agencies. PhD thesis, New York University Tandon School of Engineering, USA.

Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings. PhD thesis, Heriot-Watt University, UK.

Mistry, D and Davis, P R (2009) A client's perspective of critical success factors in project alliances. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Mitchell, A; Frame, I; Coday, A and Hoxley, M (2011) A conceptual framework of the interface between the design and construction processes. Engineering, Construction and Architectural Management, 18(3), pp. 297-311. ISSN 0969-9988

Mitropoulos, P; Abdelhamid, T S and Howell, G A (2005) Systems model of construction accident causation. Journal of Construction Engineering and Management, 131(7), pp. 816-825. ISSN 0733-9364

Mitropoulos, P; Cupido, G and Namboodiri, M (2009) Cognitive approach to construction safety: Task demand-capability model. Journal of Construction Engineering and Management, 135(9), pp. 881-889. ISSN 0733-9364

Mitropoulos, P and Memarian, B (2012) Team processes and safety of workers: Cognitive, affective, and behavioral processes of construction crews. Journal of Construction Engineering and Management, 138(10), pp. 1181-1191. ISSN 0733-9364

Mladenovic, G; Vajdic, N; Wündsch, B and Temeljotov-Salaj, A (2013) Use of key performance indicators for PPP transport projects to meet stakeholders' performance objectives. Built Environment Project and Asset Management, 3(2), pp. 228-249. ISSN 2044-124X

Moatazed-Keivani, R; Ghanbari-Parsa, A R and Kagaya, S (1999) ISO 9000 standards: Perceptions and experiences in the UK construction industry. Construction Management and Economics, 17(1), pp. 107-119. ISSN 01446193

Moezzi, M and Goins, J (2011) Text mining for occupant perspectives on the physical workplace. Building Research & Information, 39(2), pp. 169-182. ISSN 0961-3218

Moghaddam, S.; Dashti, M. S.; Alvanchi, A. and Khanzadi, M. (2026) An integrated BIM-based augmented reality framework for improving facility maintenance management. Engineering, Construction and Architectural Management, 33(3), pp. 2007-2047. ISSN 0969-9988

Moghayedi, A. and Awuzie, B. (2026) Unlocking sustainability futures: A framework for digital product passports and material banks in a circular built environment. Construction Innovation, 26(9), pp. 135-166. ISSN 1471-4175

Mohamad, M I (1999) The application of concurrent engineering philosophy to the construction industry. PhD thesis, Loughborough University, UK.

Mohamad, M I; Nekooie, M A and Al-Harthy, A B S (2012) Design changes in residential reinforced concrete buildings: The causes, sources, impacts and preventive measures. Journal of Construction in Developing Countries, 17(2), pp. 23-44. ISSN 1823-6499

Mohamad, Saifulnizam Suhaimi (2014) Value management in design planning: A systems-based framework for multi-disciplinary team involvement. PhD thesis, Queensland University of Technology, Australia.

Mohamad Bohari, Asmah Alia B (2017) Exploring the potential for green-oriented procurement in building projects: A case of the Malaysian construction industry. PhD thesis, Queensland University of Technology, Australia.

Mohamed, Emad (2021) Decision-support system for construction risk management in onshore wind projects. PhD thesis, University of Alberta, Canada.

Mohamed, M A; Hamzah, M J A; Pauzi, N N; Shahrudin, N S N and Sheffie, S I M (2023) The effect of COVID-19 on construction site personnel: Psychological and physiological perspectives. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Mohamed Sultan, A A B (2019) Decision tools for recycling with a focus on fibre reinforced composites. PhD thesis, University of Manchester, UK.

Mohammad Ahmad, A; Rodriguez Trejo, S; Hafeez, M A; Dawood, N; Kassem, M and Naji, K K (2023) Drivers for energy analysis towards a BIM-enabled information flow. Smart and Sustainable Built Environment, 12(3), pp. 507-533. ISSN 2046-6099

Mohammad Al-Naghi, A; Alaghbari, W and Barakat, T (2025) Impact of leadership skills on the success of large and medium construction projects management in Yemen. International Journal of Construction Management, 25(11), pp. 1346-1356. ISSN 1562-3599

Mohammad Shamsudin, N A (2021) Perceptions of critical success factors in the management of dilapidated schools' reconstruction projects using Industrialised Building System method in rural areas in Sarawak. PhD thesis, University of Nottingham, UK.

Mohammadpour, A (2014) Retrofitting healthcare facilities to enhance patient safety and energy efficiency. PhD thesis, Pennsylvania State University, USA.

Mohammed, A; Zayed, T; Nasiri, F and Bagchi, A (2024) Asset management-based resilience index formulation for pavements via principal components analysis. Construction Innovation, 24(3), pp. 830-845. ISSN 1471-4175

Mohd Ishak, S S; Esa, M and Ismail, M H (2017) Social capital, social network and diffusion of BIM practices. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.

Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.

Mokhtar Azizi, Z; Cochrane, J; Thurairajah, N and Mokhtar Azizi, N S (2023) Remote working in construction: Assessing the affordance of digitisation. Built Environment Project and Asset Management, 13(1), pp. 5-19. ISSN 2044-124X

Mokhtari, M and Hosseinian, S M (2025) Optimal outcome sharing among clients, builders, and designers in collaborative construction contracts: Comparing design–bid–build and design–build methods using principal–agent theory. Journal of Construction Engineering and Management, 151(3): 04024212, ISSN 0733-9364

Molaei, P; Hashempour, P and Tang, L M (2022) Semi-open spaces of apartments considering COVID-19 pandemic: General expectations of balcony design in the post-pandemic world. Architectural Engineering and Design Management, 18(5), pp. 705-722. ISSN 1745-2007

Momaya, K S (1996) International competitiveness of the Canadian construction industry: A comparison with Japan and the United States. PhD thesis, University of Toronto, Canada.

Momennia Rankohi, S (2022) Investigating the concept of integration in construction projects: Cases of integrated project delivery and design for manufacturing and assembly. PhD thesis, Ecole Polytechnique, Montreal, Canada.

Monahan, J; Coates, R and Clarke-Hagan, D (2014) Overcoming the barriers of green innovation in construction projects through its successful management. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Montalbán-Domingo, L; Torres-Machi, C; Sanz-Benlloch, A; Pellicer, E and Molenaar, K R (2023) Green public procurement in civil infrastructure construction: Current performance and main project characteristics. Journal of Construction Engineering and Management, 149(9): 04023089, ISSN 0733-9364

Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599

Monyane, T G (2019) "A lean-led-evaluation" of infrastructure development improvement programme in South Africa. PhD thesis, Nelson Mandela University, South Africa.

Moon, H; Kim, K; Lee, H S; Park, M; Williams, T P; Son, B and Chun, J Y (2020) Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis. Journal of Construction Engineering and Management, 146(9): 04020113, ISSN 0733-9364

Moon, S; Zekavat, P R and Bernold, L E (2015) Dynamic control of construction supply chain to improve labor performance. Journal of Construction Engineering and Management, 141(6): 05015002, ISSN 0733-9364

Moon, S; Zekavat, P R and Bernold, L E (2017) Dynamic quality control of process resource to improve concrete supply chain. Journal of Construction Engineering and Management, 143(5): 04016130, ISSN 0733-9364

Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.

Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180

Moore, J D (2006) Women in construction management: Creating a theory of career choice and development. PhD thesis, Colorado State University, USA.

Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.

Moore, P and Loosemore, M (2014) Burnout of undergraduate construction management students in Australia. Construction Management and Economics, 32(11), pp. 1066-1077. ISSN 01446193

Moore, W B (1989) Modeling the impact of large construction projects on surrounding communities. PhD thesis, University of Maryland, College Park, USA.

Moradi, S; Hirvonen, J and Sormunen, P (2026) Collaborative and life cycle-based project delivery for environmentally sustainable building construction: Views of Finnish project professionals and building operation and maintenance experts. Smart and Sustainable Built Environment, 15(1), pp. 407-430. ISSN 2046-6099

Moradi, S and Kähkönen, K (2022) Success in collaborative construction through the lens of project delivery elements. Built Environment Project and Asset Management, 12(6), pp. 973-991. ISSN 2044-124X

Moradi, S and Sormunen, P (2023) Revisiting the concept of waste and its causes in construction from analytical and conceptual perspectives. Construction Management and Economics, 41(8), pp. 621-633. ISSN 01446193

Morgado, J; Flores-Colen, I; De Brito, J and Silva, A (2017) Maintenance planning of pitched roofs in current buildings. Journal of Construction Engineering and Management, 143(7): 05017010, ISSN 0733-9364

Morgan Tuuli, M and Rowlinson, S (2010) What empowers individuals and teams in project settings? A critical incident analysis. Engineering, Construction and Architectural Management, 17(1), pp. 9-20. ISSN 0969-9988

Morkos, R (2014) Operational efficiency frontier: Visualizing, manipulating, and navigating the construction scheduling state space with precedence, discrete, and disjunctive constraints. PhD thesis, Stanford University, USA.

Morrey N, D A and Thomson D, P C (2013) Problematisation of the shift from products to services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Morrison, S; Callaghan, N; Tong, M and Thomson, C (2022) Quantity surveyors incorporating circularity at early project design stage: A literature review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Moselhi, O; Li, J and Alkass, S (2004) Web-based integrated project control system. Construction Management and Economics, 22(1), pp. 35-46. ISSN 01446193

Moses, S (2008) Improving interoperability of AEC collaborative software through the creation of data exchange standards. PhD thesis, Loughborough University, UK.

Moshood, T D; Ling, Y V; Chai, C and Lee, C K (2025) Intention to engage in inter-contractor cooperation: A belief elicitation study in the construction industry. Engineering, Construction and Architectural Management, 32(12), pp. 8592-8620. ISSN 0969-9988

Mostafavi, A and Karamouz, M (2010) Selecting appropriate project delivery system: Fuzzy approach with risk analysis. Journal of Construction Engineering and Management, 136(8), pp. 923-930. ISSN 0733-9364

Mostavi, E (2018) Development of multiple criteria decision making instrument in designing of high performance commercial buildings. PhD thesis, Pennsylvania State University, USA.

Mostofi, F; Tokdemir, O B and Toǧan, V (2023) Comprehensive root cause analysis of construction defects using semisupervised graph representation learning. Journal of Construction Engineering and Management, 149(9): 04023079, ISSN 0733-9364

Motaleb, O and Kishk, M (2010) An investigation into causes and effects of construction delays in UAE. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Motaleb, O H (2014) Development of a risk response model to handle delays of construction projects in the United Arab Emirates. PhD thesis, Robert Gordon University, UK.

Motawa, I; Kaka, A and Hong Wong, C (2008) Development of transparent payment systems. Journal of Financial Management of Property and Construction, 13(2), pp. 143-156. ISSN 1366-4387

Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.

Motil, M M (2015) Project duration, budget, individual role, and burnout among construction managers. PhD thesis, Walden University, USA.

Moua, B and Russell, J S (2001) Comparison of two maintainability programs. Journal of Construction Engineering and Management, 127(3), pp. 239-244. ISSN 0733-9364

Mourshed, M (2006) Interoperability-based optimisation of architectural design. PhD thesis, Loughborough University, UK.

Mousapour, B (2024) Assessment of biophilic design’s impact on citizens' residential satisfaction to enhance pro-environmental behavior. Architectural Engineering and Design Management, 20(4), pp. 761-775. ISSN 1745-2007

Moussa, A; Ezzeldin, M and El-Dakhakhni, W (2025) Machine learning and optimization strategies for infrastructure projects risk management. Construction Management and Economics, 43(8), pp. 557-582. ISSN 0144-6193

Moussa, M (2022) Truck tolling for bridges in USA: A new approach for determining a fair toll policy. PhD thesis, New York University Tandon School of Engineering, USA.

Moynat, O and Sahakian, M (2024) Imagining sufficiency through collective changes as satisfiers. Buildings & Cities, 5(1), pp. 418-433. ISSN 2632-6655

Mpakati-Gama, E C; Brown, A and Sloan, B (2016) Embodied energy and carbon analysis of urban residential buildings in Malawi. International Journal of Construction Management, 16(1), pp. 1-12. ISSN 1562-3599

Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.

Muhammed-Yakubu, N (2023) A BIM-based information management schema for construction activities data-flow across the project life cycle. PhD thesis, University of the West of England, Bristol, UK.

Muianga, Elisa Atália Daniel (2018) Evolutionary model for IPD implementation in construction projects with little diffusion of collaborative practices. PhD thesis, Universidade Estadual de Campinas, Brazil.

Muir Jr., R W (2015) Application of lean construction principles to highway projects: Analysis of barriers to timely delivery of service. PhD thesis, Drexel University, USA.

Mukherjee, A (2005) A multi-agent framework for general purpose situational simulations in construction management. PhD thesis, University of Washington, USA.

Mukwanason, D E; Tutesigensi, A; Kayondo, M and Mutikanga, H E (2023) Impact of project quality culture on defects in infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Mulenga, C Z (2020) Construction project performance in Zambia: A case study of public high schools. PhD thesis, University of Bolton, UK.

Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams. PhD thesis, University of Colorado at Denver, USA.

Mulhorn, W L (1987) Sources of conflict as perceived by architects and New Jersey public school officials when involved in a building project. EdD thesis, Temple University, USA.

Mun, H.; Jeong, J.; Jeong, J. and Kumi, L. (2026) Unsupervised learning approach for benchmark models to identify construction projects with high accident risk levels. Engineering, Construction and Architectural Management, 33(5), pp. 3777-3798. ISSN 0969-9988

Mund, A T (2002) An evaluation framework for exterior envelope wall systems for the homebuilding industry. PhD thesis, Arizona State University, USA.

Muniandy, Meenachi (2016) Assessing the economic impact of public investment in Malaysia: A case study on myrapid transit project using a dynamic computable general equilibrium model. PhD thesis, Monash University, Australia.

Munir, M (2020) Development of a building information modelling asset value realisation model. PhD thesis, University of Liverpool, UK.

Munir, Mustapha (2020) Development of a building information modelling asset (bimasset) value realisation model. PhD thesis, University of Liverpool, UK.

Muriro, A (2015) Design and build procurement method in practice: key challenges and practice based enablers. PhD thesis, University of Salford, UK.

Murray, M D; Tookey, J E; Langford, D A and Hardcastle, C (2000) Project communication variables: A comparative study of us and UK construction industry perceptions. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Murtagh, N; Achkar, L and Roberts, A (2016) “The people that no-one notices”: The power of building control inspectors in sustainable construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Murtagh, N; Achkar, L and Roberts, A (2018) The role of building control surveyors and their power in promoting sustainable construction. Construction Management and Economics, 36(7), pp. 363-374. ISSN 01446193

Murtagh, N; Owen, A M and Simpson, K (2023) Engaging UK repair–maintain–improve practitioners in improved building performance. International Journal of Building Pathology and Adaptation, 41(1), pp. 11-24. ISSN 23984708

Murtaza, I; Rashid, M U and Asad, M (2024) Construction safety challenges and opportunities at design stage for building industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 3-15. ISSN 17514304

Musallami, A A and Assaf, S (1996) Public owners' satisfaction with consultancy practices in Saudi Arabia. Building Research & Information, 24(3), pp. 148-151. ISSN 0961-3218

Musenero, Leah (2023) Development of an integrated framework for constructive dispute resolution in infrastructure public-private partnership projects. PhD thesis, University of Adelaide, Australia.

Mushtaha, E; Alsyouf, I; Hamad, R; Elmualim, A; Maksoud, A and Yahia, M W (2022) Developing design guidelines for university campus in hot climate using quality function deployment (QFD): The case of the University of sharjah, UAE. Architectural Engineering and Design Management, 18(5), pp. 593-613. ISSN 1745-2007

Mustaffa, N E and Bowles, G (2004) Dispute avoidance mechanism in partnering arrangements. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Mutti, C d N and Hughes, W P (2001) Contemporary organizational theory in the management of construction projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Muya, M; Price, A D F and Thorpe, A (1997) Construction materials supply logistics. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Muya, M; Price, A D F; Thorpe, A and Edum-Fotwe, F (1999) Application of analytic hierarchy process to the evaluation of logistics factors and their contribution to improvements in construction materials supply. Journal of Construction Procurement, 5(2), pp. 99-117. ISSN 1358-9180

Muzir, A K K (2017) School buildings maintenance in Malaysia: Current practices, key challenges and implications. PhD thesis, University of Newcastle upon Tyne, UK.

Myint, K. Z. and Hadikusumo, B. H. W. (2026) Key factors influencing governance in transport infrastructure public-private partnership projects in Myanmar: Case study approach. International Journal of Construction Management, 26(10), pp. 2258-2278. ISSN 1562-3599

Mzyece, D (2015) An investigation into the implementation of the Construction (Design and Management) Regulations in the construction industry. PhD thesis, University of Wolverhampton, UK.

Mzyece, D; Ndekugri, I E; Ankrah, N and Hammond, F (2012) The principal contractor’s role under construction (design and management) regulations 2007: Areas for further research based on a qualitative inquiry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Mzyece, D; Ndekugri, I E and Ankrah, N A (2019) Building information modelling (BIM) and the CDM regulations interoperability framework. Engineering, Construction and Architectural Management, 26(11), pp. 2682-2704. ISSN 0969-9988

Müller, C C and Elzomor, M (2025) Fostering a sustainable built environment by preparing a construction engineering workforce with sustainability key performance indicators. Journal of Construction Engineering and Management, 151(6): 04025056, ISSN 0733-9364

Naanaa, H.; Bril El Haouzi, H.; Derigent, W. and Lezoche, M. (2026) A semantic search system for efficient information retrieval in the construction domain. Smart and Sustainable Built Environment, 15(5), pp. 1781-1807. ISSN 2046-6099

Naar, L; Nikolova, N and Forsythe, P (2016) Innovative construction and the role of boundary objects: A Gehry case study. Construction Management and Economics, 34(10), pp. 688-699. ISSN 01446193

Naas, J D (1990) Identifying and predicting present and future occupational competencies for commercial construction superintendents in Illinois. PhD thesis, Southern Illinois University at Carbondale, USA.

Nabi, M A; El-Adaway, I H and Assaad, R H (2024) Modeling inflation transmission among different construction materials. Journal of Construction Engineering and Management, 150(5): 04024024, ISSN 0733-9364

Nabil, A (2016) P.A.L.M. - physical asset lifecycle modelling in the healthcare sector. PhD thesis, University College London, UK.

Nada, D (2013) Project approval decisions: Exploring success factors. PhD thesis, University of Calgary, Canada.

Naderpajouh, N and Afshar, A (2008) A case-based reasoning approach to application of value engineering methodology in the construction industry. Construction Management and Economics, 26(4), pp. 363-372. ISSN 1466433X

Naderpajouh, N; Hastak, M; Gokhale, S; Bayraktar, M E; Iyer, A and Arif, F (2015) Counterfeiting risk governance in the capital projects supply chain. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Nahmens, I and Bindroo, V (2011) Is customization fruitful in industrialized homebuilding industry? Journal of Construction Engineering and Management, 137(12), pp. 1027-1035. ISSN 0733-9364

Naji, K; Gunduz, M and Salat, F (2021) Assessment of preconstruction factors in sustainable project management performance. Engineering, Construction and Architectural Management, 28(10), pp. 3060-3077. ISSN 0969-9988

Naji, K K; Gunduz, M and Hamaidi, M F (2022) Major factors affecting construction waste management in infrastructure projects using structural equation model. Journal of Construction Engineering and Management, 148(10): 04022101, ISSN 0733-9364

Naji, K K; Gunduz, M and Maki, O (2023) Development of a campus facility management operational framework using a modified Delphi method. Journal of Construction Engineering and Management, 149(7): 04023052, ISSN 0733-9364

Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364

Naji, K K; Gunduz, M and Naser, A F (2022) The effect of change-order management factors on construction project success: A structural equation modeling approach. Journal of Construction Engineering and Management, 148(9): 04022085, ISSN 0733-9364

Nam, C H and Tatum, C B (1992) Government-industry cooperation: Fast-track concrete innovation. Journal of Construction Engineering and Management, 118(3), pp. 454-471. ISSN 0733-9364

Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(1), pp. 50-63. ISSN 1358-9180

Nascimento, C R S M S; Almeida-Filho, A T and Perez Palha, R (2025) A TOPSIS-based framework for construction projects' portfolio selection in the public sector. Engineering, Construction and Architectural Management, 32(4), pp. 2553-2570. ISSN 0969-9988

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.

Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364

Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. PhD thesis, University of Alberta, Canada.

Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Nauman, S; Zheng, C and Ahmad, R (2021) Employee career outlook and turnover: Unleashing the roles of career adaptability and career satisfaction in international construction projects. Journal of Construction Engineering and Management, 147(11): 04021150, ISSN 0733-9364

Navarro-Astor, E (2010) Job perception of Spanish qualified construction professionals. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Naveed, F and Khan, K I A (2022) Investigating the influence of information complexity on construction quality: A systems thinking approach. Engineering, Construction and Architectural Management, 29(3), pp. 1427-1448. ISSN 0969-9988

Naveed, M H; Thaheem, M J; Khurshid, M B and Farooqui, R U H (2017) Performance assessment of construction engineering and management degree program in developing countries: Case of Pakistan. International Journal of Construction Education and Research, 13(1), pp. 3-23. ISSN 1557-8771

Navendren, D; Manu, P; Shelbourn, M and Mahamadu, A M (2014) Challenges to building information modelling implementation in UK: Designers' perspectives. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X

Navon, R; Shapira, A and Shechori, Y (2000) Automated rebar constructability diagnosis. Journal of Construction Engineering and Management, 126(5), pp. 389-397. ISSN 0733-9364

Nayyer, M I and Annamalai, T R (2024) Procuring authorities and project performance: A case study of PPP highway projects in India. Built Environment Project and Asset Management, 14(1), pp. 38-55. ISSN 2044-124X

Nayyer, M I; Aravindan, M R and Annamalai, T R (2024) Impact of transparency law on the post-award development phase of toll and annuity PPPs. Built Environment Project and Asset Management, 14(1), pp. 22-37. ISSN 2044-124X

Nazeer, F S; Kamardeen, I and Hasan, A (2024) Research needs for enhancing pre-occupancy evaluation of buildings. Built Environment Project and Asset Management, 14(4), pp. 529-546. ISSN 2044-124X

Nazeer, F S; Kamardeen, I and Hasan, A (2025) Establishment of an end-user engaged building design framework. Built Environment Project and Asset Management, 15(1), pp. 106-124. ISSN 2044-124X

Ndekugri, I; Ankrah, N A and Adaku, E (2022) The design coordination role at the pre-construction stage of construction projects. Building Research & Information, 50(4), pp. 452-466. ISSN 0961-3218

Nemati, M A and Rastaghi, Z (2024) Quality assessment of on-campus student housing facilities through a holistic post-occupancy evaluation (A case study of Iran). Architectural Engineering and Design Management, 20(4), pp. 719-740. ISSN 1745-2007

Nepal, M P; Park, M and Son, B (2006) Effects of schedule pressure on construction performance. Journal of Construction Engineering and Management, 132(2), pp. 182-188. ISSN 0733-9364

Neufville, R D and Smith, J T (1994) Improving contractors' bids using preference reversal phenomenon. Journal of Construction Engineering and Management, 120(4), pp. 706-719. ISSN 0733-9364

Neuman, Y; Alves, T D C L; Walsh, K D and Needy, K L (2015) Quantitative analysis of supplier quality surveillance practices in EPC projects. Journal of Construction Engineering and Management, 141(11): 04015039, ISSN 0733-9364

Newsham, G; Brand, J; Donnelly, C; Veitch, J; Aries, M and Charles, K (2009) Linking indoor environment conditions to job satisfaction: A field study. Building Research & Information, 37(2), pp. 129-147. ISSN 0961-3218

Newsham, G R; Birt, B J; Arsenault, C; Thompson, A J L; Veitch, J A; Mancini, S; Galasiu, A D; Gover, B N; MacDonald, I A and Burns, G J (2013) Do green buildings have better indoor environments? New evidence. Building Research & Information, 41(4), pp. 415-434. ISSN 0961-3218

Ng, C-W V (2007) Managing power, conflict and change: an analytical model for construction contract procurement. PhD thesis, University of Hong Kong, Hong Kong.

Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.

Ng, S T; Xie, J and Kumaraswamy, M M (2010) Simulating the effect of risks on equity return for concession-based public-private partnership projects. Engineering, Construction and Architectural Management, 17(4), pp. 352-368. ISSN 0969-9988

Ng, T; Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO 9000-based quality management systems to construction contractors. Construction Economics and Building, 8(2), pp. 23-29. ISSN 2204-9029

Ngacho, C (2013) An assessment of the performance of public sector construction projects: An empirical study of projects funded under constituency development fund (CDF) in Western Province Kenya. PhD thesis, University of Delhi, India.

Ngoma, S; Mundia, M and Kaliba, C (2014) Benefits, constraints and risks in infrastructure development via public-private partnerships in Zambia. Journal of Construction in Developing Countries, 19(1), pp. 15-33. ISSN 1823-6499

Ngowi, A B (1997) Impact of culture on construction procurement. Journal of Construction Procurement, 3(1), pp. 3-15. ISSN 1358-9180

Nguyen, T D H N; Park, S; Jeong, J and Ahn, Y (2026) Post occupancy evaluation of the relocatable modular construction method for temporary educational facilities. Engineering, Construction and Architectural Management, 33(1), pp. 785-809. ISSN 0969-9988

Nguyen, V N; Peansupap, V and Tongthong, T (2025) Complexity measurement framework for change orders in construction projects: Case study of Vietnam. Journal of Engineering, Design and Technology, 23(6), pp. 2082-2104. ISSN 1726-0531

Nguyen, Anh Chi (2023) Risk allocation, decision rights, and adaptive lifecycle project management practices in public-private partnership highway contracts in Australia, the Philippines, and India. PhD thesis, Virginia Tech, USA.

Nguyen, D M; Ding, G and Runeson, G (2020) Energy and economic analysis of environmental upgrading of existing office buildings. Construction Economics and Building, 20(4), pp. 82-102. ISSN 2204-9029

Nguyen, Duy Hung (2022) Evaluating risk factors in green building: The case of sustainable construction in Vietnam. PhD thesis, Università degli Studi di Padova, Italy.

Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.

Nguyen, H D; Dang, C N; Le-Hoai, L and Luu, Q T (2023) Exploratory analysis of legal risk causes in tourism real estate projects in emerging economies: Empirical study from Vietnam. International Journal of Construction Management, 23(5), pp. 830-842. ISSN 1562-3599

Nguyen, H T and Hadikusumo, B (2017) Impacts of human resource development on engineering, procurement, and construction project success. Built Environment Project and Asset Management, 7(1), pp. 73-85. ISSN 2044-124X

Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.

Nguyen, P H D (2020) Development of fuzzy hybrid approaches to project delivery method selection in highway construction. PhD thesis, University of Kansas, USA.

Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364

Nguyen, P H D; Tran, D and Lines, B C (2020) Fuzzy set theory approach to classify highway project characteristics for delivery selection. Journal of Construction Engineering and Management, 146(5): 04020044, ISSN 0733-9364

Nguyen, P H D; Tran, D Q and Bypaneni, S P K (2021) Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways. Construction Management and Economics, 39(11), pp. 879-893. ISSN 01446193

Nguyen, P H D; Tran, D Q and Lines, B C (2020) Empirical inference system for highway project delivery selection using fuzzy pattern recognition. Journal of Construction Engineering and Management, 146(12): 04020141, ISSN 0733-9364

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public–private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public-private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, T A; Do, S T; Le-Hoai, L; Nguyen, V T and Pham, T A (2023) Practical workflow for cultural heritage digitalization and management: A case study in Vietnam. International Journal of Construction Management, 23(13), pp. 2305-2319. ISSN 1562-3599

Nguyen, T H; Berstein, S; McIntyre, C and Smith, G R (2008) Customer service management practices in the homebuilding industry. International Journal of Construction Education and Research, 4(1), pp. 3-17. ISSN 1557-8771

Nguyen, T Q; Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(4), pp. 704-728. ISSN 23984708

Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364

Nguyen, T T N; Nguyen, T A; Do, S T and Nguyen, V T (2024) Developing a structural model of stakeholders' behavior toward BIM adoption in construction enterprises. International Journal of Construction Management, 24(10), pp. 1038-1053. ISSN 1562-3599

Nguyen Van, D; Le Dinh, T and Tran, H-B (2022) Assessing stakeholder satisfaction in PPP transport projects in developing countries: Evidence from Vietnam. Built Environment Project and Asset Management, 12(2), pp. 309-324. ISSN 2044-124X

Nibbelink, J-G; Sutrisna, M and Zaman, A U (2017) Unlocking the potential of early contractor involvement in reducing design risks in commercial building refurbishment projects: a Western Australian perspective. Architectural Engineering and Design Management, 13(6), pp. 439-456. ISSN 1745-2007

Nicol, F and Roaf, S (2005) Post-occupancy evaluation and field studies of thermal comfort. Building Research & Information, 33(4), pp. 338-346. ISSN 0961-3218

Nie, P; Dahanayake, K C and Sumanarathna, N (2024) Exploring uae's transition towards circular economy through construction and demolition waste management in the pre-construction stage–a case study approach. Smart and Sustainable Built Environment, 13(2), pp. 246-266. ISSN 2046-6099

Nieto-Morote, A and Ruz-Vila, F (2012) Last planner control system applied to a chemical plant construction. Journal of Construction Engineering and Management, 138(2), pp. 287-293. ISSN 0733-9364

Nigaglioni, R (2016) The relationship between the emotional intelligence of managers and the success of construction projects. DBA thesis, Northcentral University, USA.

Nikolov, A (2022) Exploring pathways for improving the supply chain integration of infrastructure projects. PhD thesis, University of Warwick, UK.

Nilsson Vestola, E and Eriksson, P E (2023) Engineered and emerged collaboration: Vicious and virtuous cycles. Construction Management and Economics, 41(1), pp. 79-96. ISSN 01446193

Nimlyat, P S; Salihu, B and Wang, G P (2024) The impact of indoor environmental quality (IEQ) on patients' health and comfort in Nigeria. International Journal of Building Pathology and Adaptation, 42(4), pp. 510-530. ISSN 23984708

Ninan, Johan (2019) External stakeholder management strategies in infrastructure megaprojects: An organizational power perspective. PhD thesis, University of Technology Sydney, Australia.

Ning, Y and Ling, F Y Y (2014) Boosting public construction project outcomes through relational transactions. Journal of Construction Engineering and Management, 140(1): 04013037, ISSN 0733-9364

Ning, Y and Ling, F Y Y (2023) Selecting control strategies in projects of intangible outputs: Empirical evidence from architectural and engineering design projects. Engineering, Construction and Architectural Management, 30(10), pp. 4695-4714. ISSN 0969-9988

Nitithamyong, P (2003) Analysis of success and failure factors in application of web-based project management systems in construction. PhD thesis, Purdue University, USA.

Nitithamyong, P and Skibniewski, M J (2006) Success/failure factors and performance measures of web-based construction project management systems: Professionals' viewpoint. Journal of Construction Engineering and Management, 132(1), pp. 80-87. ISSN 0733-9364

Nitithamyong, P and Skibniewski, M J (2011) Success factors for the implementation of web-based construction project management systems: A cross-case analysis. Construction Innovation, 11(1), pp. 14-42. ISSN 1471-4175

Niu, Y; Nwagboso, C; Proverbs, D and Olomolaiye, P (2004) Developing supply chain integration in building technologies cluster. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Nixon, A M (2002) The selection of architectural firms in Indiana school construction projects. EdD thesis, Ball State University, USA.

Nizam Shaikh, R (2019) BIM-based investigation of total energy consumption in delivering buildings as a product. PhD thesis, University of Liverpool, UK.

Nkado, R N and Mbachu, J I (2001) Modelling client needs and satisfaction in the built environment. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Nobe, M C and Greenwell, C (2016) Moving operations and maintenance practices of existing buildings beyond sustainability: A case study of the lenses framework during post occupancy. International Journal of Construction Education and Research, 12(2), pp. 122-141. ISSN 1557-8771

Noktehdan, M; Shahbazpour, M; Zare, M R and Wilkinson, S (2019) Innovation management and construction phases in infrastructure projects. Journal of Construction Engineering and Management, 145(2): 04018135, ISSN 0733-9364

Noorzai, E (2023) Evaluating lean techniques to improve success factors in the construction phase. Construction Innovation, 23(3), pp. 622-639. ISSN 1471-4175

North, Steve (2003) Clients' 3D visualisation of construction performance: from s-curves to data surfaces. PhD thesis, University College London, UK.

Noruwa, B; Merschbrock, C; Arewa, A O and Agyekum-Mensah, G (2018) Institutional foundations of construction ICT: A view from the West midlands of England. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Noruwa, B I; Arewa, A O and Merschbrock, C (2022) Effects of emerging technologies in minimising variations in construction projects in the UK. International Journal of Construction Management, 22(11), pp. 2199-2206. ISSN 1562-3599

Noshadravan, A; Miller, T R and Gregory, J G (2017) A lifecycle cost analysis of residential buildings including natural hazard risk. Journal of Construction Engineering and Management, 143(7): 04017017, ISSN 0733-9364

Nouh, A; Elkasaby, E and Wageh, O (2024) Dynamic approach for investigating delivery system effects on infrastructure project performance. Engineering, Construction and Architectural Management, 31(12), pp. 4791-4808. ISSN 0969-9988

Nouh Meshref, A; Elkasaby, E and Wageh, O (2026) Innovative strategic multicriteria decision-making selection model of infrastructures projects delivery systems using multiobjective optimization, case of Egypt. Construction Innovation, 26(2), pp. 353-368. ISSN 1471-4175

Noyce, D A and Hanna, A S (1997) Planned schedule compression concept file for electrical contractors. Journal of Construction Engineering and Management, 123(2), pp. 189-197. ISSN 0733-9364

Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Nwadigo, O; Naismith, N N; Ghaffarianhoseini, A; Ghaffarian Hoseini, A and Tookey, J (2021) Dynamic Bayesian network modelling for predicting adaptability of time performance during time influencing factors disruptions in construction enterprise. Engineering, Construction and Architectural Management, 28(10), pp. 2994-3013. ISSN 0969-9988

Nyakala, S; Pretorius, J and Vermeulen, A (2020) Construction quality process implementation as a source of competitive advantage in small and medium-sized construction projects. Journal of Construction Business and Management, 4(2), pp. 46-54. ISSN 2521-0165

Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165

Nyamagere Gladys, S; Rwelamila, P D and Gimbi, J J (2022) A conceptual framework for managing post-disaster reconstruction projects in emerging economies: The case of Angola. Built Environment Project and Asset Management, 12(2), pp. 205-222. ISSN 2044-124X

Nzekwe-Excel, C (2010) Development of an integrated framework for satisfaction assessment of construction project teams. PhD thesis, University of Wolverhampton, UK.

Nzekwe-Excel, C (2012) Satisfaction assessment in construction projects: A conceptual framework. Built Environment Project and Asset Management, 2(1), pp. 86-102. ISSN 2044-124X

Nzekwe-Excel, C; Nwagboso, C; Georgakis, P and Proverbs, D (2010) Integrated framework for satisfaction assessment in construction sector. Journal of Engineering, Design and Technology, 8(2), pp. 168-188. ISSN 1726-0531

Nzekwe-Excel, C; Nwagboso, C; Proverbs, D and Georgakis, P (2008) An approach for evaluating the satisfaction of a construction project team. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

O'Connor, J T and Koo, H J (2021) Proactive design quality assessment tool for building projects. Journal of Construction Engineering and Management, 147(2): 04020174, ISSN 0733-9364

O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175

O'Connor, J T and Mock, B (2020) Responsibilities and accountabilities for industrial facility commissioning and startup activities. Construction Innovation, 20(4), pp. 625-645. ISSN 1471-4175

O'Connor, J T; O'Brien, W J and Choi, J O (2014) Critical success factors and enablers for optimum and maximum industrial modularization. Journal of Construction Engineering and Management, 140(6): 4014012, ISSN 0733-9364

O'Connor, J T; Shrestha, B K; Winkler, M and Ouk Choi, J (2021) Relationship between commissioning and start-up success factors achievement and performance in capital projects. Journal of Construction Engineering and Management, 147(3): 04021001, ISSN 0733-9364

O'Connor, J T; Torres, N and Woo, J (2016) Sustainability actions during the construction phase. Journal of Construction Engineering and Management, 142(7): 4016016, ISSN 0733-9364

O'Grady, W (2013) A knowledge management system to optimise comfort throughout the building life-cycle. PhD thesis, University College Cork, Ireland.

O'Sullivan, D T J (2005) Improving building performance by tracking performance metrics using an IFC data model. PhD thesis, University College Cork, Ireland.

Obeidat, B and Zahrawi, R (2024) Exploring the impact of built environment design on oncology inpatient rooms: A single-based study of King Abdullah University Hospital. Architectural Engineering and Design Management, 20(4), pp. 972-995. ISSN 1745-2007

Obi, L; Arif, M and Goulding, J (2020) Low-cost housing: A cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(6), pp. 411-425. ISSN 1745-2007

Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.

Obi, L I; Arif, M; Awuzie, B; Islam, R; Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), pp. 625-647. ISSN 1471-4175

Obi, L I; Arif, M and Kulonda, D J (2017) Prioritizing cost management system considerations for Nigerian housing projects. Journal of Financial Management of Property and Construction, 22(2), pp. 135-153. ISSN 1366-4387

Obi, L I; Arif, M; Lamb, S M and Ashayeri, I (2025) Establishing interrelationships and dependencies of critical success factors for implementing offsite construction in the UK. Smart and Sustainable Built Environment, 14(3), pp. 810-834. ISSN 2046-6099

Obunwo, C; Chinyio, E and Suresh, S (2015) Relative contributions of project quality to customer satisfaction in Nigerian road construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Obunwo, C U C (2016) A framework for enhancing project quality and customer satisfaction in government road construction projects in Rivers State, Nigeria. PhD thesis, University of Wolverhampton, UK.

Ochieng, E G (2008) Framework for managing multi-cultural project teams. PhD thesis, Loughborough University, UK.

Ochieng, E G and Price, A D F (2009) Addressing cultural issues when managing multicultural construction project teams. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Ochieng, E G and Price, A D F (2010) Factors influencing effective performance of multi-cultural construction project teams. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ochieng, E G; Price, A D F; Ruan, X; Egbu, C O and Moore, D (2013) The effect of cross-cultural uncertainty and complexity within multicultural construction teams. Engineering, Construction and Architectural Management, 20(3), pp. 307-324. ISSN 0969-9988

Ochoa Franco, L A (2004) Life cycle assessment of residential buildings. PhD thesis, Carnegie Mellon University, USA.

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387

Odiba, E (2018) A model for effective quality management practices in construction organisations: The case of Nigeria. PhD thesis, Loughborough University, UK.

Odiba, E; Demian, P and Ruikar, K (2021) Development of a conceptual framework for effective quality management practices in construction organisations. Journal of Construction Business and Management, 5(1), pp. 1-16. ISSN 2521-0165

Odimabo, O (2016) Risk management system to guide building construction projects in developing countries: a case study of Nigeria. PhD thesis, University of Wolverhampton, UK.

Odusami, K T (2003) Criteria for measuring project performance by construction professionals in Nigerian construction industry. Journal of Financial Management of Property and Construction, 8(1), pp. 39-48. ISSN 1366-4387

Oechler, E; Molenaar, K R; Hallowell, M and Scott, S (2018) State-of-practice for risk-based quality assurance in state departments of transportation. Engineering, Construction and Architectural Management, 25(7), pp. 958-970. ISSN 0969-9988

Oei, F J and Ogunlana, S O (2006) Assessment of the development role of a statutory body from a customer perspective: A relationship marketing approach. Journal of Construction in Developing Countries, 11(2), pp. 31-52. ISSN 1823-6499

Ofori, G (2001) Indicators for measuring construction industry development in developing countries. Building Research & Information, 29(1), pp. 40-50. ISSN 0961-3218

Ofori, G and Gang, G U (2001) ISO 9000 certification of Singapore construction enterprises: Its costs and benefits and its role in the development of the industry. Engineering, Construction and Architectural Management, 8(2), pp. 145-157. ISSN 0969-9988

Ofori, G and Toor, S R (2012) Leadership and construction industry development in developing countries. Journal of Construction in Developing Countries, 17(S1), pp. 1-21. ISSN 1823-6499

Ogbu, C P and Imafidon, M O (2022) Influence of selection criteria on clients' satisfaction with construction consultancy services in Nigeria. Journal of Engineering, Design and Technology, 20(6), pp. 1519-1537. ISSN 1726-0531

Ogbu, C P and Olatunde, N (2019) Relationship between organisational effectiveness and project performance of SME contractors: A developing country perspective. Journal of Construction Business and Management, 3(2), pp. 1-16. ISSN 2521-0165

Ogunba, O A; Dabara, D I and Gbadegesin, J T (2023) Sustainable real estate management practice: Exploring the priority of operational stage for actualizing sustainable built environment goal in Sub-Saharan Africa. International Journal of Construction Management, 23(10), pp. 1746-1755. ISSN 1562-3599

Ogunbayo, O T (2019) Respondents' perception of risk factors on residential property development in Abuja, Nigeria. Journal of Construction Business and Management, 3(1), pp. 18-26. ISSN 2521-0165

Ogundare, I.; Kassa, R.; Maali, O.; Lines, B.; Smithwick, J. and Sullivan, K. (2026) Skillsets differences among field leaders in the US sheet metal and air conditioning trades. Built Environment Project and Asset Management, 16(3), pp. 561-577. ISSN 2044-124X

Ogunlana, S O (1999) Procurement lessons from Solomon's temple project. Journal of Construction Procurement, 5(2), pp. 187-196. ISSN 1358-9180

Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.

Ogunrinde, O (2020) Enhancing quality management in highway construction using emerging methods. PhD thesis, University of Alabama, USA.

Ogunsanya, O A (2018) Integrated sustainable procurement model for the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.

Ogunseiju, O; Odeyinka, H A and Yusuf, A O (2023) Usage of building information modelling in quantity surveying firms in Nigeria. Journal of Construction Business and Management, 6(2), pp. 27-37. ISSN 2521-0165

Ogwueleka, A C and Maritz, M J (2016) Modeling for incentive payoffs in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(3), pp. 543-562.

Ogwueleka, A C and Udoudoh, F P (2018) The impact of risk and reward dynamics in incentive compensation plans in the Nigerian construction industry. International Journal of Construction Management, 18(3), pp. 247-259. ISSN 1562-3599

Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364

Ohrn, G (2009) The influence of job-order-contracting as a construction project delivery method on owner satisfaction. PhD thesis, Indiana State University, USA.

Ojebode, A J (2016) Public-private partnership (PPP) as a mechanism for the provision of affordable housing delivery in Nigeria. PhD thesis, University of Brighton, UK.

Ojghaz, A S and Heravi, G (2026) An integrated BIM-GIS framework for building quality assessment based on price estimation: Evaluating design and location factors. Journal of Construction Engineering and Management, 152(4): 04026020, ISSN 0733-9364

Ojiako, G U (2005) Project failures: A comparative study of information and communication technologies (ICT) and construction projects. PhD thesis, University of Northumbria at Newcastle, UK.

Ojiako, U; Papadopoulos, T; Stamati, T; Anagnostopoulos, D and Marshall, A (2015) Collaborative governance in Greek infrastructure projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 135-145. ISSN 17514304

Ojo, L. D.; Chan, A. P. C.; Sing, M. C. P. and Kazeem, K. O. (2026) Impact of integrity-based approach to ethics management on project performance. Journal of Engineering, Design and Technology, ISSN 1726-0531

Okakpu, A I (2019) Investigating the effectiveness of adopting building information modelling for refurbishment of complex buildings: Case study of auckland. PhD thesis, Auckland University of Technology, New Zealand.

Okanlawon, T. T.; Oyewobi, L. O.; Kabir, I.; Badamasi, A.; Dodo, M. and Jimoh, R. A. (2026) Enhancing the integration of digital twin in construction phases: Key drivers for adoption in Nigeria. Journal of Engineering, Design and Technology, 24(1), pp. 124-150. ISSN 1726-0531

Oke, A E; Aliu, J; Ehiosun, L U; Kineber, A F and Stephen, S S (2025) Adoption of distributed ledger technology for construction projects: A study of the challenges in a developing country. Journal of Engineering, Design and Technology, 23(5), pp. 1364-1383. ISSN 1726-0531

Oke, A. E.; Aliu, J. O.; Timothy Jesudaju, O.; Thomas Fagbe, A.; Aghimien, D. and Aigbavboa, C. O. (2025) Building a sustainable future: The role of digitalization in Nigerian heavy engineering projects. Engineering, Construction and Architectural Management, 33(5), pp. 3957-3974. ISSN 0969-9988

Oke, A E; Aigbavboa, C O and Raphiri, M M (2017) Students' satisfaction with hostel accommodations in higher education institutions. Journal of Engineering, Design and Technology, 15(5), pp. 652-666.

Oke, A E; Aliu, J; Ehiosun, L U; Ebekozien, A and Rotimi, A A (2024) From hurdles to heights: Blueprint for tackling distributed ledger technology challenges in the construction sector of a developing economy. Journal of Financial Management of Property and Construction, 29(3), pp. 405-424. ISSN 1366-4387

Oke, A E; Arowoiya, V A; Chan, M and Oyediran, A (2025) Digital twin technology (DTT) in a developing construction industry: Evaluation of the awareness and usage among professionals in Nigeria. International Journal of Construction Management, 25(11), pp. 1313-1323. ISSN 1562-3599

Okeke, R.; Garuba, B. and Orji, F. (2025) The role of team temporal leadership in driving construction project success: A meta-analytical review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 82-107. ISSN 1751-4304

Okello, J F; Bowa, O and Migosi, J (2025) The role of project delivery methods on the execution of construction projects in the Kenyan judiciary. Construction Economics and Building, 25(1), pp. 49-68. ISSN 2204-9029

Okika, Michael Chuba (2023) Risk analysis framework to minimise risks in construction projects. PhD thesis, University of Johannesburg, South Africa.

Okonkwo, C; Evans, U F and Ekung, S (2023) Unearthing direct and indirect material waste-related factors underpinning cost overruns in construction projects. International Journal of Construction Management, 23(13), pp. 2298-2304. ISSN 1562-3599

Okoroh, M I; Goulding, J S and Walker, S (2006) Outsourcing local authorities housing stocks. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Okudan, O; Budayan, C and Dikmen, I (2020) Development of a conceptual life cycle performance measurement system for build-operate-transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988

Okudan, O; Budayan, C and Dikmen, I (2021) Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988

Oladiran, O J (2009) Innovative waste management through the use of waste management plans on construction projects in Nigeria. Architectural Engineering and Design Management, 5(3), pp. 165-176. ISSN 1745-2007

Olaniyan, R (2019) Barriers to technology adoption among construction project managers in Nigeria. PhD thesis, Walden University, USA.

Olanrewaju, A and Tan, S Y (2018) An exploration into design criteria for affordable housing in Malaysia. Journal of Engineering, Design and Technology, 16(3), pp. 360-384. ISSN 1726-0531

Olanrewaju, A; Tan, Y Y and Soh, S N (2022) Defect characterisations in the Malaysian affordable housing. International Journal of Building Pathology and Adaptation, 40(4), pp. 539-568. ISSN 23984708

Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(3), pp. 281-295. ISSN 2044-124X

Olanrewaju, A A L (2012) Quantitative analysis of defects in university buildings: User perspective. Built Environment Project and Asset Management, 2(2), pp. 167-181. ISSN 2044-124X

Olasunkanmi, F. F. O. (2026) Structural equation modelling for the impacts of transactional leadership styles on project performance. Construction Economics and Building, 26(2), ISSN 2204-9029

Olasunkanmi, F F O; Ikediashi, D I and Ajiero, I R (2024) Assessing the factors of transactional leadership style for construction projects: A case of Nigerian construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1637-1654. ISSN 1726-0531

Olatunbosun, S; Odediran, S; Ekundayo, D and Aigbavboa, C (2024) Factors inhibiting energy access in the delivery of construction projects in Lagos metropolis, Nigeria. International Journal of Construction Management, 24(11), pp. 1215-1224. ISSN 1562-3599

Olatunde, N A; Awodele, I A and Ramabodu, M S (2026) Delivery strategies of private building projects amid hyper-inflationary trends in Southwest Nigeria. International Journal of Construction Management, 26(3), pp. 482-495. ISSN 1562-3599

Olatunde, N A; Fidelis, I M; Awodele, I A and Adebayo, B O (2024) Stakeholders prioritization of key performance indicators on public and private tertiary educational projects in Osun State, Nigeria. International Journal of Building Pathology and Adaptation, 42(5), pp. 881-892. ISSN 2398-4708

Olatunde, N A; Ogunsemi, D R and Oke, A E (2017) Impact of team members' composition on construction projects delivery in selected higher institutions in Nigeria. Journal of Engineering, Design and Technology, 15(3), pp. 355-377.

Olatunji, O A (2019) Promoting student commitment to BIM in construction education. Engineering, Construction and Architectural Management, 26(7), pp. 1240-1260. ISSN 0969-9988

Olatunji, O A and Akanmu, A (2015) BIM-FM and consequential loss: How consequential can design models be? Built Environment Project and Asset Management, 5(3), pp. 304-317. ISSN 2044-124X

Olatunji, S O; Olawumi, T O and Aje, I O (2017) Rethinking partnering among quantity-surveying firms in Nigeria. Journal of Construction Engineering and Management, 143(11): 05017018, ISSN 0733-9364

Olawale, O A; Oyedele, L O and Owolabi, H A (2020) Construction practitioners’ perception of key drivers of reputation in mega-construction projects. Journal of Engineering, Design and Technology, 18(6), pp. 1571-1592. ISSN 1726-0531

Olawumi, T O and Chan, D W M (2022) Developing project evaluation models for smart sustainable practices implementation in construction projects: A comparative study between Nigeria and Hong Kong. Engineering, Construction and Architectural Management, 29(3), pp. 1522-1552. ISSN 0969-9988

Olayinka, R; Suresh, S and Chinyio, E (2015) Impact of knowledge management on the cost of poor quality. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(4), pp. 177-188. ISSN 17514304

Olayinka, R A (2015) A knowledge management framework for reducing the cost of poor quality on construction projects. PhD thesis, University of Wolverhampton, UK.

Oliomogbe G O, S N J (2013) Does the deployment of project management itself provide benefits? Both tangible and intangible. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Olivieri, H; Seppänen, O; Alves, T D C L; Scala, N M; Schiavone, V; Liu, M and Granja, A D (2019) Survey comparing critical path method, last planner system, and location-based techniques. Journal of Construction Engineering and Management, 145(12): 04019077, ISSN 0733-9364

Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.

Olojede, B O; Opawole, A; Jagboro, G O and Alao, O O (2023) Examination of roles performed by public sector organizations in the procurement of public-private partnership projects. International Journal of Building Pathology and Adaptation, 41(2), pp. 495-511. ISSN 23984708

Olopade, J O (2020) Qualitative comparative analysis of causal pathways to successful construction cross-functional teams. PhD thesis, University of Florida, USA.

Oloufa, A A (1988) A framework for the operational simulation of construction projects. PhD thesis, University of California, Berkeley, USA.

Olowoake, M A O (2015) A theoretical framework to support facilities maintenance management of higher education institutions buildings in Nigeria. PhD thesis, University of Salford, UK.

Olugboyega, O (2019) Specific roles of builders in building information modelling processes. Journal of Construction in Developing Countries, 23(2), pp. 27-42. ISSN 1823-6499

Olugboyega, O and Aina, O O (2018) Examination of the levels of development of building information models in the Nigerian construction industry. Journal of Construction Business and Management, 2(2), pp. 1-14. ISSN 2521-0165

Olugboyega, O; Ejohwomu, O A and Omopariola, E D (2025) Examining the mediating roles of social malaise and religious manipulations in corruption manifestations: The case of the construction sector. Engineering, Construction and Architectural Management, 32(3), pp. 1457-1477. ISSN 0969-9988

Oluwatayo, A A (2015) Employee architect's perception of human resource practices and their job satisfaction. Built Environment Project and Asset Management, 5(1), pp. 89-102. ISSN 2044-124X

Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.

Ombwayo, J; Kidombo, H and Gakuu, C (2026) Moderating influence of stakeholder involvement on the relationship between project management lifecycle and performance of slum upgrading projects: A case of Nairobi city county, Kenya. International Journal of Construction Management, 26(1), pp. 1-11. ISSN 1562-3599

Omotayo, T; Olanipekun, A; Obi, L and Boateng, P (2020) A systems thinking approach for incremental reduction of non-physical waste. Built Environment Project and Asset Management, 10(4), pp. 509-528. ISSN 2044-124X

Omotayo, T S (2017) Strategic realignment of the post-contract cost control process in the Nigerian construction industry using kaizen. PhD thesis, University of Salford, UK.

Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.

Ong, Eric Mei Siang (2008) Trust, commitment, satisfaction and learning in construction project teams. PhD thesis, University of New South Wales, Australia.

Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.

Ono, Eikichi (2025) Occupant-centric design for functional and thermal zoning at activity-based workspaces. PhD thesis, National University of Singapore, Singapore.

Onubi, H O; Yusof, N A and Hassan, A S (2019) Green site practices and environmental performance: How project complexity moderates the relationship. Construction Economics and Building, 19(1), pp. 75-95. ISSN 2204-9029

Onyia, U (2019) Improving the supervisory and managerial skills and competences required in construction management in Nigeria. PhD thesis, London South Bank University, UK.

Oo, B L and Lim, B T H (2025) Working from home during the COVID-19 pandemic and gender differences: A case of construction workforce in Australia. Engineering, Construction and Architectural Management, 32(7), pp. 4439-4457. ISSN 0969-9988

Oo, B L and Lim, B T-H (2016) Game-based learning in construction management courses: A case of bidding game. Engineering, Construction and Architectural Management, 23(1), pp. 4-19. ISSN 0969-9988

Opawole, A (2018) Penalty mechanisms for enforcing concessionaire performance in public-private partnership contracts in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 161-191.

Opawole, A; Alao, O O; Yusuf, A O; Adu, E T and Ofoetan, M A (2022) Evaluation of compliance of concreting materials to standards in building projects in Lagos state, Nigeria. Journal of Construction Business and Management, 5(2), pp. 1-19. ISSN 2521-0165

Opdyke, A (2017) Resilient and sustainable infrastructure systems: A comparative analysis of post-disaster shelter coordination, stakeholder participation, and training. PhD thesis, University of Colorado at Boulder, USA.

Ophiyandri, T (2013) Project risk management for community-based post-disaster housing reconstruction. PhD thesis, University of Salford, UK.

Ophiyandri, T; Amaratunga, D and Keraminiyage, K (2016) Advantages and limitations of community-based post-disaster housing reconstruction projects. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 420-431. ISSN 1759-5916

Ophiyandri, T; Amaratunga, D; Pathirage, C and Keraminiyage, K (2013) Critical success factors for community-based post-disaster housing reconstruction projects in the pre-construction stage in Indonesia. International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 236-249. ISSN 1759-5916

Opoku, A and Egbu, C (2018) Students' perspectives on the relevance of sustainability literacy in a postgraduate built environment program. International Journal of Construction Education and Research, 14(1), pp. 46-58. ISSN 1557-8771

Opoku, A and Fortune, C (2010) Promoting organizational learning and project sustainability in the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Opoku, A and Ibrahim-Adam, R (2018) Early contractor involvement in government construction projects in Ghana. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Oral, E L and Mstkolu, G (2000) Current state of Turkish prefabrication companies with respect to the applicability of just in time. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Organ, S (2020) The opportunities and challenges of improving the condition and sustainability of a historic building at an international tourist attraction in the UK. International Journal of Building Pathology and Adaptation, 38(2), pp. 329-355. ISSN 23984708

Orhan, E; Kahraman, Z E and Güngördü, N (2020) Building a framework for analysing the quality of life at neighbourhood level: An empirical case from Ankara. Journal of Construction in Developing Countries, 25(1), pp. 63-82. ISSN 1823-6499

Ormeño Zender, Y and García de Soto, B (2021) Use of scrum in the rehabilitation of a commercial building in Peru. Construction Innovation, 21(2), pp. 145-163. ISSN 1471-4175

Orstavik, F (2018) Negotiating and knowing built quality. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Osaghae, E and Olatunji, O A (2024) Key drivers of value amongst multicultural teams in construction projects. International Journal of Construction Management, 24(14), pp. 1581-1588. ISSN 1562-3599

Osaily, Y (2021) Guidance for advancing demolition project management in the UK. PhD thesis, University of Bath, UK.

Osei-Appiah, V K; Kissi, E; Karikari, V A; Ayeng, P; Danquah-Smith, E and Adesi, M (2024) Assessing the impact of early supplier involvement on public works procurement. Journal of Financial Management of Property and Construction, 29(2), pp. 229-249. ISSN 1366-4387

Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387

Oshin-Martin, M (2014) Managing beyond the contract: Communicating and connecting to build sustainable collaborative relationships in international public-private partnerships. DM thesis, University of Maryland University College, USA.

Oshinubi, O O (2007) The influence of project managers' leadership styles on project team performance in the construction industry. DM thesis, University of Phoenix, USA.

Osipova, E (2013) On enhancing joint risk management throughout a project's lifecycle: Empirical studies of Swedish construction projects. PhD thesis, Luleå University of Technology, Sweden.

Osipova, E and Eriksson, P E (2011) How procurement options influence risk management in construction projects. Construction Management and Economics, 29(11), pp. 1149-1158. ISSN 1466433X

Osman, H and Nikbakht, M (2014) A game-theoretic model for roadway performance management: A socio-technical approach. Built Environment Project and Asset Management, 4(1), pp. 40-54. ISSN 2044-124X

Osman, H M and El-Diraby, T E (2011) Knowledge-enabled decision support system for routing urban utilities. Journal of Construction Engineering and Management, 137(3), pp. 198-213. ISSN 0733-9364

Ospina Alvarado, A M (2011) Unified framework for construction project integration and its potential association with project performance. PhD thesis, Georgia Institute of Technology, USA.

Ospina-Alvarado, A; Castro-Lacouture, D and Roberts, J S (2016) Unified framework for construction project integration. Journal of Construction Engineering and Management, 142(7): 4016019, ISSN 0733-9364

Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure. PhD thesis, University of California, Davis, USA.

Ostrovsky, Y (2003) Four studies of lifecycle patterns of housing arrangements in Canada. PhD thesis, York University, Canada.

Osuizugbo, I C (2021) The need for and benefits of buildability analysis: Nigeria as a case study. Journal of Engineering, Design and Technology, 19(5), pp. 1207-1230. ISSN 1726-0531

Osuizugbo, I C (2024) Factors impeding the implementation of buildability assessment in building construction industry. Journal of Engineering, Design and Technology, 22(6), pp. 1825-1846. ISSN 1726-0531

Osuizugbo, I C and Adenuga, O A (2024) Decisive factors for decision-making to achieving sustainable procurement in construction projects. International Journal of Building Pathology and Adaptation, 42(6), pp. 1185-1202. ISSN 2398-4708

Osuizugbo, I C; Fauzi, M A; Omer, M M; Njogo, B O and Orekan, A A (2024) Research trends on early contractor involvement in construction projects: A bibliometric analysis. Construction Economics and Building, 24(4-5), pp. 160-178. ISSN 2204-9029

Osuizugbo, I C; Omer, M M; Rahman, R A and Oshodi, O S (2024) A systematic search and review of early contractor involvement in construction project development. Built Environment Project and Asset Management, 14(6), pp. 835-857. ISSN 2044-124X

Osunsanmi, T O; Aigbavboa, C O; Oke, A and Onyia, M E (2022) Making a case for smart buildings in preventing corona-virus: Focus on maintenance management challenges. International Journal of Construction Management, 22(16), pp. 3109-3118. ISSN 1562-3599

Oswald, T H (1995) A model for using quality function deployment in engineering project development. PhD thesis, Clemson University, USA.

Othman, A A; Torrance, J V and Hamid, M A (2006) Factors influencing the construction time of civil engineering projects in Malaysia. Engineering, Construction and Architectural Management, 13(5), pp. 481-501. ISSN 0969-9988

Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.

Othman, A A E and Hussein, R M (2024) Innovation management framework for achieving sustainability through managing risks of innovative solutions during the design process. Journal of Engineering, Design and Technology, 22(6), pp. 1870-1893. ISSN 1726-0531

Othman, Z M Z (2007) Classifying the aptitude of Civil Engineering Project Managers using Multivariate Discriminant Analysis. PhD thesis, Loughborough University, UK.

Otim, M A; Kyalisiima, C; Tutesigensi, A; Mutikanga, H E and Kayondo, M (2023) Avoiding disputes through effective procurement in large construction projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Oussadou, A (1988) Residential satisfaction in the new urban housing projects in Algeria: a case study of Ain-Allah, Algiers. PhD thesis, University of Nottingham, UK.

Outcault, S; Alston-Stepnitz, E; Sanguinetti, A; DePew, A N and Magaña, C (2022) Building lower-carbon affordable housing: Case studies from California. Building Research & Information, 50(6), pp. 646-661. ISSN 0961-3218

Ovbagbedia, O O and Ochieng, E G (2015) Impact of organisational culture on knowledge transfer in Nigerian heavy engineering projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 241-247. ISSN 17514304

Oviedo-Haito, R J; Jiménez, J; Cardoso, F F and Pellicer, E (2014) Survival factors for subcontractors in economic downturns. Journal of Construction Engineering and Management, 140(3): 4013056, ISSN 0733-9364

Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study. PhD thesis, University of Maryland, College Park, USA.

Oyedele, L; Jaiyeoba, B and Fadeyi, M (2003) Design factors influencing quality of building projects in Nigeria: Consultants' perception. Construction Economics and Building, 3(2), pp. 25-32. ISSN 2204-9029

Oyefusi, O N; Enegbuma, W I and Brown, A (2025) From systematic literature review to performance criteria evaluation: advancing green supply chain management in construction. International Journal of Construction Management, 25(3), pp. 249-264. ISSN 1562-3599

Oyegoke, A S; Fisher, B W; Ajayi, S; Omotayo, T S and Ewuga, D (2024) The disruptive factors and longevity effects of covid-19 and brexit on the SMEs construction supply chain in the UK. Journal of Financial Management of Property and Construction, 29(1), pp. 115-134. ISSN 1366-4387

Oyegoke, A S and Kiiras, J (2004) Two generic perspectives of CM contracting systems: A case of the US, the UK and Finland. Journal of Construction Procurement, 10(2),

Oyemomi, B; Hare, B and Tong, M (2016) Exploring human resource incentivisation for public sector construction project delivery in Scotland. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Oyetunji, A A (2001) Methodology for selecting project delivery and contract strategies for capital projects. PhD thesis, Texas A&M University, USA.

Oyetunji, A A and Anderson, S D (2006) Relative effectiveness of project delivery and contract strategies. Journal of Construction Engineering and Management, 132(1), pp. 3-13. ISSN 0733-9364

Oyewobi, L; Okanlawon, T T; Ibrahim, K and Jimoh, R A (2025) Influence of blockchain adoption barriers and drivers on potential application areas in the construction lifecycle: Partial least squares structural equation modelling (PLS-SEM) approach. Engineering, Construction and Architectural Management, 32(3), pp. 1798-1815. ISSN 0969-9988

Oyewobi, L O; Abiola-Falemu, O and Ibironke, O T (2016) The impact of rework and organisational culture on project delivery. Journal of Engineering, Design and Technology, 14(2), pp. 214-237.

Oyewobi, L O; Windapo, A O; Rotimi, J O B and Jimoh, R A (2019) Determining strategic clusters and performance of construction organizations in South Africa. International Journal of Construction Management, 19(1), pp. 46-56. ISSN 1562-3599

Oyewole, E O and Dada, J O (2019) Training gaps in the adoption of building information modelling by Nigerian construction professionals. Built Environment Project and Asset Management, 9(3), pp. 399-411. ISSN 2044-124X

Oyeyipo, O; Adeyemi, B; Osuizugbo, I and Ojelabi, R (2022) Service quality of building services consultants in building project delivery; clients' perspectives. International Journal of Construction Management, 22(15), pp. 2886-2894. ISSN 1562-3599

Oyeyipo, O O; Odusami, K T; Ojelabi, R A and Afolabi, A O (2016) Factors affecting contractors' bidding decisions for construction projects in Nigeria. Journal of Construction in Developing Countries, 21(2), pp. 21-35. ISSN 1823-6499

Ozcan-Deniz, G (2011) An integrated multi-agent framework for optimizing time, cost and environmental impact of construction processes. PhD thesis, Florida International University, USA.

Ozdemir, B and Kumral, M (2017) Stochastic assessment of the material haulage efficiency in the earthmoving industry. Journal of Construction Engineering and Management, 143(8): 05017013, ISSN 0733-9364

Ozener, O O (2009) Studio education for integrated practice using building information modeling. PhD thesis, Texas A&M University, USA.

Ozorhon, B. and Karakurt, C. (2026) Navigating retail construction projects in Türkiye: Critical enablers and barriers. Engineering, Construction and Architectural Management, pp. 1-20. ISSN 0969-9988

Ozorhon, B. and Karakurt, C. (2026) Navigating retail construction projects in Türkiye: Critical enablers and barriers. Engineering, Construction and Architectural Management, pp. 1-20. ISSN 0969-9988

Ozorhon, B; Arditi, D; Dikmen, I and Birgonul, M T (2011) Toward a multidimensional performance measure for international joint ventures in construction. Journal of Construction Engineering and Management, 137(6), pp. 403-411. ISSN 0733-9364

O’Connell, S; Reynders, G; Seri, F; Sterling, R and Keane, M M (2020) A standardised flexibility assessment methodology for demand response. International Journal of Building Pathology and Adaptation, 38(1), pp. 20-37. ISSN 23984708

Padala, S P S and M Skanda, P (2025) BIM-based multi-objective optimization framework for volumetric analysis of building projects. Journal of Engineering, Design and Technology, 23(5), pp. 1326-1347. ISSN 1726-0531

Padala, S P S; Maheswari, J U and Hirani, H (2022) Identification and classification of change causes and effects in construction projects. International Journal of Construction Management, 22(14), pp. 2788-2807. ISSN 1562-3599

Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.

Palaneeswaran, E and Kumaraswamy, M M (2003) Knowledge mining of information sources for research in construction management. Journal of Construction Engineering and Management, 129(2), pp. 182-191. ISSN 0733-9364

Palaneeswaran, E; Kumaraswamy, M M and Ng, S T (2003) Formulating a framework for relationally integrated construction supply chains. Journal of Construction Research, 4(2), pp. 189-205. ISSN 1609-9451

Pan, H; Huang, H; Luo, Z; Wu, C and Yang, S (2025) Research on safety risk factors of metro shield tunnel construction in China based on social network analysis. Engineering, Construction and Architectural Management, 32(12), pp. 8114-8144. ISSN 0969-9988

Pan, J (2006) Construction project information management in a semantic web environment. PhD thesis, Loughborough University, UK.

Pan, P; Wang, Y; Yang, Y and Zhang, S (2025) Conceptualization and measurement of owner BIM capabilities: From a project owner organization perspective. Engineering, Construction and Architectural Management, 32(6), pp. 3963-3997. ISSN 0969-9988

Pan, W (2010) Strategies for managing innovation in UK housebuilding. Engineering, Construction and Architectural Management, 17(1), pp. 78-88. ISSN 0969-9988

Pan, W and Gibb, A G F (2009) Maintenance performance evaluation of offsite and in situ bathrooms. Construction Innovation, 9(1), pp. 7-21. ISSN 1471-4175

Pan, W; Yang, Y and Pan, M (2023) Implementing modular integrated construction in high-rise high-density cities: Perspectives in Hong Kong. Building Research & Information, 51(3), pp. 354-368. ISSN 0961-3218

Panadés, K.; Olbina, S. and Kohlman Rabbani, E. R. (2026) Social sustainability in building retrofit projects: A systematic literature review. International Journal of Building Pathology and Adaptation, 44(4), pp. 1098-1120. ISSN 2398-4708

Panayamkandi, R (2007) Development of a design process map for improving the efficiency of small and medium sized building consulting practices. PhD thesis, Heriot-Watt University, UK.

Pancholi, J and Devkar, D G (2023) Analyzing the influence of organizational culture in projects using Last Planner System. Construction Economics and Building, 23(3-4), pp. 143-169. ISSN 2204-9029

Paneru, S; Suh, S; Seo, W and Rausch, C (2024) Evaluating the decarbonization potential of industrialized construction: A review of the current state, opportunities, and challenges. Journal of Construction Engineering and Management, 150(9): 03124005, ISSN 0733-9364

Panwar, A and Jha, K N (2017) Trade-off between life cycle cost and greenhouse gas emission in construction projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Panwar, A and Jha, K N (2019) A many-objective optimization model for construction scheduling. Construction Management and Economics, 37(12), pp. 727-739. ISSN 01446193

Papachristos, G; Jain, N; Burman, E; Zimmermann, N; Wu, X; Liu, P; Mumovic, D; Lin, B; Davies, M and Edkins, A (2020) Low carbon building performance in the construction industry: A multi-method approach of system dynamics and building performance modelling. Construction Management and Economics, 38(9), pp. 856-876. ISSN 01446193

Papadonikolaki, E and van Oel, C (2016) The actors' perceptions and expectations of their roles in BIM-based collaboration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Papajohn, D (2019) Contract administration functions and tools for design-build and construction manager/general contractor project delivery in U.S. Highway construction. PhD thesis, Arizona State University, USA.

Parami Dewi, Anak Agung Diah (2013) Framework for implementing design build project delivery system in road infrastructure in Indonesia. PhD thesis, Queensland University of Technology, Australia.

Pararajasingam, R; Waidyasekara, A S and Victar, H C (2026) Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka. Construction Innovation, 26(1), pp. 22-43. ISSN 1471-4175

Parisi, Fabio (2023) Automation and information approaches to support maintenance and production management in the construction industry. PhD thesis, Politecnico di Bari, Italy.

Park, A and Chang, C Y (2013) Impacts of construction events on the project equity value of the Channel Tunnel project. Construction Management and Economics, 31(3), pp. 223-237. ISSN 1466433X

Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.

Park, J (2017) Dynamic multi-dimensional BIM for total construction as-built documentation. PhD thesis, Purdue University, USA.

Park, M; Ji, S H; Lee, H S and Kim, W (2009) Strategies for design-build in Korea using system dynamics modeling. Journal of Construction Engineering and Management, 135(11), pp. 1125-1137. ISSN 0733-9364

Parker, M A (2022) Developing a performance index to measure soft skills on construction projects: a Delphi study. PhD thesis, Aston University, UK.

Parkhurst, G and Parnaby, R (2008) Growth in mobile air-conditioning: A socio-technical research agenda. Building Research & Information, 36(4), pp. 351-362. ISSN 0961-3218

Parkinson, T; Schiavon, S; Kim, J and Betti, G (2023) Common sources of occupant dissatisfaction with workspace environments in 600 office buildings. Buildings & Cities, 4(1), pp. 17-35. ISSN 2632-6655

Parrish, K D (2009) Applying a set-based design approach to reinforcing steel design. PhD thesis, University of California, Berkeley, USA.

Pasqual, I R and Ekanayake, L (2025) Win–win approach to subcontracting in building construction: Sri Lankan perspective. Construction Economics and Building, 25(3-4), pp. 339-357. ISSN 2204-9029

Pasquire, C (1999) The implications of environmental issues on UK construction management. Engineering, Construction and Architectural Management, 6(3), pp. 276-286. ISSN 0969-9988

Pasquire, C; Ballard, G; Zimina, D and Pasquire, C L (2011) Applying lean thinking in commercial management. Journal of Financial Management of Property and Construction, 16(1), pp. 64-72. ISSN 1366-4387

Pasquire, C L and King, J H J (2000) Project team performance within the Scottish water market based private finance initiative. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Patacas, J (2019) A framework and common data environment for the development and management of asset information models. PhD thesis, Teesside University, UK.

Patel, A J (1996) Development of fatigue based pay adjustment factors in performance-related specifications for full-depth asphalt concrete pavements. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Patel, M and Robinson, H (2010) Impact of governance on project delivery of complex NHS PFI/PPP schemes. Journal of Financial Management of Property and Construction, 15(3), pp. 216-234. ISSN 1366-4387

Patterson, D A; Farnsworth, C B; Hutchings, D M; Eggett, D L and Weidman, J E (2023) Comparing cost, schedule, and quality of CM/GC and DBB project delivery for repetitive commercial construction. International Journal of Construction Education and Research, 19(2), pp. 166-186. ISSN 1557-8771

Patterson, M R (2017) Skin fit and retrofit: Challenging the sustainability of curtainwall practice in tall buildings. PhD thesis, University of Southern California, USA.

Patton, J R (2013) Task diminishment: Construction value loss due to sub-optimal task execution. PhD thesis, Indiana State University, USA.

Payne, A S (2021) Impact of personality traits and team criteria on construction team performance. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Pearson, A L; Barnard, L T; Pearce, J; Kingham, S and Howden-Chapman, P (2014) Housing quality and resilience in New Zealand. Building Research & Information, 42(2), pp. 182-190. ISSN 0961-3218

Pearson, J (2014) Effective employer engagement in full time construction-related foundation degrees, with particular emphasis on workplace learning. PhD thesis, Northumbria University, UK.

Peckham, G E (1971) The systems approach to school construction: the potential benefits, the necessary conditions, and the implications for Michigan schools. PhD thesis, Michigan State University, USA.

Peer, S (1987) Principles of an integrated construction company mis with emphasis on its quantity-based sub-system. Construction Management and Economics, 5(3), pp. 199-209. ISSN 01446193

Pekeriçli, M K (2010) A lifecycle information management solution for built environment facilities. PhD thesis, University of Reading, UK.

Pekkonen, M; Turunen, M and Haverinen-Shaughnessy, U (2018) Housing quality perceptions in Finland: The elderly population. Building Research & Information, 46(4), pp. 417-429. ISSN 0961-3218

Pekuri, A; Pekuri, L and Haapasalo, H (2013) The role of business models in Finnish construction companies. Construction Economics and Building, 13(3), pp. 13-23. ISSN 2204-9029

Pellegrino, R (2021) Effects of public supports for mitigating revenue risk in public-private partnership projects: Model to choose among support alternatives. Journal of Construction Engineering and Management, 147(12), ISSN 0733-9364

Pemsel, S and Widén, K (2011) Bridging boundaries between organizations in construction. Construction Management and Economics, 29(5), pp. 495-506. ISSN 1466433X

Pena-Mora, F and Park, M (2001) Dynamic planning for fast-tracking building construction projects. Journal of Construction Engineering and Management, 127(6), pp. 445-456. ISSN 0733-9364

Pennington, D E (1977) A cost analysis of the construction management method of school facility construction. EdD thesis, Indiana University, USA.

Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.

Pereira, Ana Paula Carvalho (2017) Building information modeling in the project phase: A proposal for a BIM execution plan for SUMAI / UFBA. PhD thesis, Universidade Federal da Bahia, Brazil.

Perera, B A K S; Perera, C S R and Jayalath, C (2022) Contractor’s perspective on key performance indicators of cost control in Asian, middle eastern, and European construction projects. International Journal of Construction Education and Research, 18(3), pp. 217-233. ISSN 1557-8771

Perera, H P; Perera, B A K S and Palihakkara, A D (2023) Financial and economic risk management in coastal land reclamation projects. Construction Innovation, 23(4), pp. 878-897. ISSN 1471-4175

Perera, S; Davis, S and Marosszeky, M (2011) Head contractor role in construction value-based management: Australian building industry experience. Journal of Financial Management of Property and Construction, 16(1), pp. 31-41. ISSN 1366-4387

Perera, Weebadda Arachchilage Salinda (2018) An investigation into developing productive construction environments to improve quality performance in Australian building construction. PhD thesis, University of New South Wales, Australia.

Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of last planner system®: A case study. Engineering, Construction and Architectural Management, 25(9), pp. 1110-1126. ISSN 0969-9988

Perkins, R A (2009) Sources of changes in design: build contracts for a governmental owner. Journal of Construction Engineering and Management, 135(7), pp. 588-593. ISSN 0733-9364

Perovic, Miljenka (2015) Overcoming the challenges of building heritage projects: Improvements to time, scope and cost performance. PhD thesis, Queensland University of Technology, Australia.

Perrenoud, A J and Sullivan, K T (2017) Analysis of executive succession planning in 12 construction companies. International Journal of Construction Education and Research, 13(1), pp. 64-80. ISSN 1557-8771

Persad, K R (1989) Management of the preconstruction process for highway projects using manpower demand prediction models. PhD thesis, University of Texas at Austin, USA.

Persson, M (2010) Impact assessment and project appraisal in cases of coastal erosion. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 297-309. ISSN 1759-5916

Persson, M H (2006) Lessons learned in knowledge management: The case of construction. PhD thesis, Lund University, Sweden.

Peters, R; Whitman, P and Hampson, K (2001) Skill development for innovative procurement environments in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Petkov, I (2022) Optimal decarbonization conditions for buildings & districts: A model-based techno-economic perspective. DSc thesis, ETH Zürich, Switzerland.

Pham Van, B and Peansupap, V (2024) Confirmatory analysis on factors influencing the material management effectiveness in construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2536-2562. ISSN 0969-9988

Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects. PhD thesis, University of Texas at Austin, USA.

Phelps, A F (2008) Lean information flow in complex healthcare projects and the role of the “integrator” as information flow manager. PhD thesis, Pennsylvania State University, USA.

Pheng, L S; Arain, F M and Fang, J W Y (2011) Applying just-in-time principles in the delivery and management of airport terminal buildings. Built Environment Project and Asset Management, 1(1), pp. 104-121. ISSN 2044-124X

Pheng, L S and Fong, E T W (2002) Preparations for ISO 9001:2000: a study of ISO 9000:1994 certified construction firms. Construction Management and Economics, 20(5), pp. 403-413. ISSN 01446193

Pheng, L S and Hou, C W (2008) Middle management's influence on the effectiveness of ISO 9000 quality management systems in architectural firms. Architectural Engineering and Design Management, 4(3-4), pp. 189-205. ISSN 1745-2007

Pheng, L S and Hui, M S (2004) Implementing and applying six sigma in construction. Journal of Construction Engineering and Management, 130(4), pp. 482-489. ISSN 0733-9364

Pheng, L S and Lim, R B L (2000) Quality system QS 9000 for construction: Is the industry in Singapore ready? Journal of Construction Research, 1(1), pp. 19-31. ISSN 1609-9451

Pheng, L S and May, C F (1997) Quality management systems: A study of authority and empowerment. Building Research & Information, 25(3), pp. 158-169. ISSN 0961-3218

Pheng, L S and Omar, H F (1997) Integration, segmentalism and the maintenance of quality management systems in the construction industry. Building Research & Information, 25(1), pp. 36-49. ISSN 0961-3218

Pheng, L S and Tan, J H K (2005) Integrating ISO 9001 quality management system and ISO 14001 environmental management system for contractors. Journal of Construction Engineering and Management, 131(11), pp. 1241-1244. ISSN 0733-9364

Phillips, S; Dainty, A and Price, A (2007) The development of a tender analysis support tool for use in social housing best value procurement. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Phillips, S; Martin, J; Dainty, A and Price, A (2007) Uncertainty in best value decision making. Journal of Financial Management of Property and Construction, 12(2), pp. 63-72. ISSN 1366-4387

Phillips, S; Martin, J; Dainty, A and Price, A (2008) Analysis of the quality attributes used in establishing best value tenders in the UK social housing sector. Engineering, Construction and Architectural Management, 15(4), pp. 307-320. ISSN 0969-9988

Phua, F T T (2004) The antecedents of co-operative behaviour among project team members: An alternative perspective on an old issue. Construction Management and Economics, 22(10), pp. 1033-1045. ISSN 01446193

Phua, F T-T (2002) Toward a critical assessment of social identity: the nature of organisational identification and its implicationsfor inter-organisational cooperation in the context of the Hong Kongconstruction industry. PhD thesis, University of Hong Kong, Hong Kong.

Phung, Q; Erdogan, B and Nielsen, Y (2026) Influence of sustainability adoption on the success of construction projects. Building Research & Information, 54(3), pp. 345-358. ISSN 0961-3218

Phung, Q.; Erdogan, B. and Nielsen, Y. (2026) An integrated framework for managing sustainability in construction projects. Built Environment Project and Asset Management, pp. 1-21. ISSN 2044-124X

Phung, Q; Erdogan, B and Nielsen, Y (2023) Project management for sustainable buildings: A comprehensive insight into the relationship to project success. Engineering, Construction and Architectural Management, 30(7), pp. 2862-2878. ISSN 0969-9988

Phung, Q A (2020) Project management for sustainable project success. PhD thesis, Heriot-Watt University, UK.

Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.

Pichura, A C (2004) The phenomenon of innovation and its influence on changing project delivery models in construction in Japan. PhD thesis, University of Tokyo, Japan.

Pidgeon, A and Dawood, N (2023) Verification and validation of a framework for collaborative BIM implementation, measurement and management (cimm). Smart and Sustainable Built Environment, 12(4), pp. 847-871. ISSN 2046-6099

Pidomson, G B (2016) Unexpected events in Nigerian construction projects: A case of four construction companies. PhD thesis, Walden University, USA.

Pietroforte, R and Miller, J B (2002) Procurement methods for us infrastructure: Historical perspectives and recent trends. Building Research & Information, 30(6), pp. 425-434. ISSN 0961-3218

Pietroforte, R and Stefani, T P (2004) Asce journal of construction engineering and management: Review of the years 1983-2000. Journal of Construction Engineering and Management, 130(3), pp. 440-448. ISSN 0733-9364

Ping, T; Pan, W and Zhang, Z (2025) Developing a systematic performance measurement framework for benchmarking steel modular building construction. Engineering, Construction and Architectural Management, 32(3), pp. 1837-1856. ISSN 0969-9988

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.

Pipattanapiwong, J and Watanabe, T (2000) Multi-party risk management process (MRMP) for a construction project financed by an international lender. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Pirzadeh, P; Lingard, H and Blismas, N (2021) Design decisions and interactions: A sociotechnical network perspective. Journal of Construction Engineering and Management, 147(10): 04021110, ISSN 0733-9364

Pishdad-Bozorgi, P (2012) Case-based study and analysis of integrated project delivery (IPD) approach and trust-building attributes. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Pishdad-Bozorgi, P and Beliveau, Y J (2016) Symbiotic relationships between integrated project delivery and trust. International Journal of Construction Education and Research, 12(3), pp. 179-192. ISSN 1557-8771

Pishdad-Bozorgi, P and Beliveau, Y J (2016) Symbiotic relationships between integrated project delivery (IPD) and trust. International Journal of Construction Education and Research, 12(3), pp. 179-192. ISSN 1557-8771

Plaut, J M; Dunbar, B; Wackerman, A and Hodgin, S (2012) Regenerative design: The lenses framework for buildings and communities. Building Research & Information, 40(1), pp. 112-122. ISSN 0961-3218

Plugge, P W (2007) An evidence-based comparison of construction project delivery. PhD thesis, Colorado State University, USA.

Poirier, E; Forgues, D and Staub-French, S (2016) Collaboration through innovation: Implications for expertise in the AEC sector. Construction Management and Economics, 34(11), pp. 769-789. ISSN 01446193

Poirier, E; Staub-French, S; Pilon, A; Fallahi, A; Teshnizi, Z; Tannert, T and Froese, T (2022) Design process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 23-40. ISSN 1471-4175

Poirier, E A; Forgues, D and Staub-French, S (2017) Understanding the impact of BIM on collaboration: A Canadian case study. Building Research & Information, 45(6), pp. 681-695. ISSN 0961-3218

Pokharel, H K (2023) Improving quality: Exploring ceramic water filters in developing communities. PhD thesis, University of Rhode Island, USA.

Pongpeng, J (2002) Multicriteria and multidecision-makers in tender evaluation. PhD thesis, Queensland University of Technology, Australia.

Pongpeng, J and Liston, J (2003) Constractor ability criteria: A view from the Thai construction industry. Construction Management and Economics, 21(3), pp. 267-282. ISSN 01446193

Pons, O; Casanovas-Rubio, M M; Armengou, J and De La Fuente, A (2021) Sustainability-driven decision-making model: Case study of fiber-reinforced concrete foundation piles. Journal of Construction Engineering and Management, 147(10): 04021116, ISSN 0733-9364

Ponton, H (2021) Social interactions in construction design team meetings. PhD thesis, Northumbria University, UK.

Ponton, H; Osborne, A; Greenwood, D and Thompson, N (2019) Exploring the designer-constructor teamwork interface to improve collaboration: A review of current literature. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ponton, H; Osbourne, A; Greenwood, G and Thompson, N (2018) Understanding the dynamics of construction design team meetings through joint laughter. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Poon, J (2004) Development of an expert system modelling the construction process. Journal of Construction Research, 5(1), pp. 125-138. ISSN 1609-9451

Poon, J; Potts, K and Cooper, P (1999) Development of a new best practice model for building projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Porwal, A and Hewage, K N (2012) Building information modeling-based analysis to minimize waste rate of structural reinforcement. Journal of Construction Engineering and Management, 138(8), pp. 943-954. ISSN 0733-9364

Postnikova, O; Bamgbade, J A and Wong, N H (2022) Performance index for public housing in East Malaysia. Architectural Engineering and Design Management, 18(5), pp. 652-670. ISSN 1745-2007

Potemans, A; Volker, L and Hermans, M (2018) From agents to stewards? Experiences from a Dutch infrastructure case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Potseluyko Amobi, L (2021) Improving business and technical operations within timber frame self-build housing sector by applying integrated VR/AR and BIM technologies. PhD thesis, Teesside University, UK.

Powell, A; Galea, N; Salignac, F; Loosemore, M and Chappell, L (2018) Masculinity and workplace wellbeing in the Australian construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Power, W; Sinnott, D and Lynch, P (2022) Accelerating construction project delivery using agile's integrated system of principles and methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Power, W; Sinnott, D and Lynch, P (2024) Takt complementing Last Planner® system on residential construction projects. Construction Economics and Building, 24(4-5), pp. 58-80. ISSN 2204-9029

Powmya, A; Nazirah, Z A and Nurul Sakina, M A (2023) Determination of contractor strategies in delivering construction projects in Oman. Journal of Construction in Developing Countries, 28(1), pp. 293-316. ISSN 1823-6499

Pozzer, A E; Rausch, C and Leite, F (2025) Methodology for evaluating the uncertainty of embodied carbon assessments in construction projects across project phases. Journal of Construction Engineering and Management, 151(10): 04025158, ISSN 0733-9364

Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector. PhD thesis, University of the West of England, Bristol, UK.

Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Manu, P; Che Ibrahim, C K I and Aigbavboa, C O (2021) The effectiveness of interactive virtual reality for furniture, fixture and equipment design communication: An empirical study. Engineering, Construction and Architectural Management, 28(5), pp. 1440-1467. ISSN 0969-9988

Praharaj, S and Han, H (2019) Building a typology of the 100 smart cities in India. Smart and Sustainable Built Environment, 8(5), pp. 400-414. ISSN 2046-6099

Prasad K V; Vasugi V; Venkatesan R and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(1), pp. 58-78. ISSN 1366-4387

Pratas, J D G (2000) Comparison of the use and success of budgetary and schedule-based management information systems (MIS) in construction. PhD thesis, University of Manchester, UK.

Praticò, F G; Antonio, C and Domenico, T (2012) Influence of dispersion and location on pay adjustment in construction engineering. Journal of Construction Engineering and Management, 138(10), pp. 1125-1130. ISSN 0733-9364

Praticò, F G; Casciano, A and Tramontana, D (2011) Pavement life-cycle cost and asphalt binder quality: Theoretical and experimental investigation. Journal of Construction Engineering and Management, 137(2), pp. 99-107. ISSN 0733-9364

Praticò, F G and Giunta, M (2018) Proposal of a key performance indicator for railway track based on LCC and rams analyses. Journal of Construction Engineering and Management, 144(2): 04017104, ISSN 0733-9364

Prego, F J; Solla, M; Núñez-Nieto, X and Arias, P (2016) Assessing the applicability of ground-penetrating radar to quality control in tunneling construction. Journal of Construction Engineering and Management, 142(5): 06015006, ISSN 0733-9364

Presland, A J (2023) "Picturing construction, constructing identities: the photographic archive of John Laing & Son Ltd". PhD thesis, University College London, UK.

Price, T (2010) Site waste management plans, the designer and the CDM principal contractor. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Price, T; Wamuziri, S and Gupta, N (2009) Magnet safety in magnetic resonance imaging suite construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Prieto, A J and Alarcón, L F (2023) Using fuzzy inference systems for lean management strategies in construction project delivery. Journal of Construction Engineering and Management, 149(9): 04023083, ISSN 0733-9364

Prigge, D V (2013) Experimentation of managerial techniques for the optimization of a voluntary construction workforce. PhD thesis, Arizona State University, USA.

Priven, V and Sacks, R (2015) Effects of the last planner system on social networks among construction trade crews. Journal of Construction Engineering and Management, 141(6): 04015006, ISSN 0733-9364

Priven, V and Sacks, R (2016) Impacts of the social subcontract and last planner system interventions on the trade-crew workflows of multistory residential construction projects. Journal of Construction Engineering and Management, 142(7): 4016013, ISSN 0733-9364

Prochorskaite, A (2016) An investigation of the 'soft' features of sustainable and healthy housing design: exploring stakeholder preferences and their provision in new housing developments. PhD thesis, Liverpool John Moores University, UK.

Pryke, S; Lunic, D and Badi, S (2015) The effect of leader emotional intelligence on leader–follower chemistry: A study of construction project managers. Construction Management and Economics, 33(8), pp. 603-624. ISSN 01446193

Pryke, Stephen David (2002) UK construction in transition: developing a social network approach to the evaluation of new procurement and management strategies. PhD thesis, University College London, UK.

Pugh, T E (1994) Design-construction interface performance on traditional capital improvement projects. PhD thesis, University of Texas at Austin, USA.

Pulaski, M H and Horman, M J (2005) Continuous value enhancement process. Journal of Construction Engineering and Management, 131(12), pp. 1274-1282. ISSN 0733-9364

Pulaski, M H and Horman, M J (2005) Organizing constructability knowledge for design. Journal of Construction Engineering and Management, 131(8), pp. 911-919. ISSN 0733-9364

Pun, S K; Liu, C and Langston, C (2006) Case study of demolition costs of residential buildings. Construction Management and Economics, 24(9), pp. 967-976. ISSN 1466433X

Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099

Purushothaman, M B and Seadon, J (2024) System-wide construction waste and their connectivity to construction phases, impacting 5m factors and effects: A systematic review. Smart and Sustainable Built Environment, 13(2), pp. 354-369. ISSN 2046-6099

Pyles, E J (2022) Impact of psychological safety on organizational safety climate and safety culture in the heavy industrial construction industry: An embedded case study. DELead thesis, University of Charleston - Beckley, USA.

Qu, T (2006) The usability of graphical user interfaces of mobile computing devices designed for construction foremen: Icons and pre-defined text lists compared. PhD thesis, University of Florida, USA.

Quaigrain, R A and Issa, M H (2018) Development and validation of disability management indicators for the construction industry. Journal of Engineering, Design and Technology, 16(1), pp. 81-100.

Radzi, A R; Azmi, N F; Kamaruzzaman, S N and Rahman, R A (2025) Modeling the critical assessment criteria for construction readiness of BIM-based projects: PLS-SEM approach. Journal of Construction Engineering and Management, 151(6): 04025063, ISSN 0733-9364

Radzi, A R; Rahman, R A; Doh, S I and Esa, M (2022) Construction readiness for highway projects: Key decision criteria. Journal of Construction Engineering and Management, 148(2): 04021196, ISSN 0733-9364

Rafaat, R; Osman, H; Georgy, M and Elsaid, M (2020) Preferred risk allocation in egypt's water sector PPPs. International Journal of Construction Management, 20(6), pp. 585-597. ISSN 1562-3599

Rahat, R; Ferrer, V; Pradhananga, P and ElZomor, M (2023) Developing an effective front-end planning framework for sustainable infrastructure projects. International Journal of Construction Management, 23(16), pp. 2841-2858. ISSN 1562-3599

Rahat, R; Ferrer, V; Pradhananga, P and ElZomor, M (2023) A pedagogical paradigm to support infrastructure projects through coupling front-end planning techniques with sustainability practices. International Journal of Construction Education and Research, 19(3), pp. 276-298. ISSN 1557-8771

Rahman, M. L.; Ayentimi, D. T.; Wickham, M. and Mbiro, J. E. (2026) A contemporary framework for sustainable entrepreneurial project management. Engineering, Construction and Architectural Management, 33(15), ISSN 0969-9988

Rahman, H A (1993) The management and cost of quality for civil engineering projects. PhD thesis, University of Manchester, UK.

Rahman, M M (2002) Joint risk management through transactionally efficient relational contracting. Construction Management and Economics, 20(1), pp. 45-54. ISSN 01446193

Rahman, M M (2003) Revitalising construction project procurement through joint risk management. PhD thesis, University of Hong Kong, Hong Kong.

Rahman, M M and Kumaraswamy, M M (2001) Appraising the potential for joint risk management. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Rahman, M M and Kumaraswamy, M M (2005) Relational selection for collaborative working arrangements. Journal of Construction Engineering and Management, 131(10), pp. 1087-1098. ISSN 0733-9364

Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(4), pp. 365-375. ISSN 01446193

Rahman, M M and Kumaraswamy, M M (2012) Multicountry perspectives of relational contracting and integrated project teams. Journal of Construction Engineering and Management, 138(4), pp. 469-480. ISSN 0733-9364

Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988

Rahmani, F (2021) Challenges and opportunities in adopting early contractor involvement (ECI): Client's perception. Architectural Engineering and Design Management, 17(1-2), pp. 67-76. ISSN 1745-2007

Rahmani, F; Scott-Young, C; Tadayon, A and van der Walt, J D (2022) Team composition in relational contracting (RC) in large infrastructure projects: A belbin's team roles model approach. Engineering, Construction and Architectural Management, 29(5), pp. 2027-2046. ISSN 0969-9988

Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.

Rahmat, I B (1997) The planning and control process of refurbishment projects. PhD thesis, University College London, UK.

Raidén, A B (2004) The development of a strategic employee resourcing framework (SERF) for construction organisations. PhD thesis, Loughborough University, UK.

Raidén, A B; Dainty, A R J and Neale, R H (2003) A strategic employee resourcing framework (serf) for construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Raidén, A B; Dainty, A R J and Neale, R H (2008) Understanding employee resourcing in construction organizations. Construction Management and Economics, 26(11), pp. 1133-1143. ISSN 1466433X

Raidén, A B; Williams, H and Dainty, A (2008) Human resource information systems in construction: A review seven years on. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Raimi, T (2017) Achieving customer satisfaction in a private housing organisation in Nigeria. PhD thesis, University of Liverpool, UK.

Rainer, R K (1968) Predicting productivity of one or two elevators for construction of high-rise buildings. PhD thesis, Oklahoma State University, USA.

Raisbeck, P (2010) Investigating design as research: Understanding R&D activities in Australian architectural practices. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Raisbeck, P; Millie, R and Maher, A (2010) Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Raisbeck, P and Tang, L C M (2013) Identifying design development factors in Australian PPP projects using an AHP framework. Construction Management and Economics, 31(1), pp. 20-39. ISSN 1466433X

Rajan, A T; Bansal, B and Gemson, J (2014) Private equity investment and real estate development: Evidence from residential projects in India. Journal of Financial Management of Property and Construction, 19(3), pp. 202-225. ISSN 1366-4387

Rajan Annamalai, T and Jain, N (2013) Project finance and investments in risky environments: Evidence from the infrastructure sector. Journal of Financial Management of Property and Construction, 18(3), pp. 251-267. ISSN 1366-4387

Rajendran, S (2007) Sustainable construction safety and health rating system. PhD thesis, Oregon State University, USA.

Ramaji, I J and Memari, A M (2016) Product architecture model for multistory modular buildings. Journal of Construction Engineering and Management, 142(10): 04016047, ISSN 0733-9364

Ramanayaka, C and Rotimi, J (2011) Strategy: Towards its applicability for successful project delivery. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Ramanayaka, C D D (2013) Developing a strategy-led approach as a suitable methodology for construction project planning and implementation. PhD thesis, Auckland University of Technology, New Zealand.

Ramaswamy, S D and Pertusier, E M (1986) Construction of barrettes for high-rise foundations. Journal of Construction Engineering and Management, 112(4), pp. 455-462. ISSN 0733-9364

Rampini, Luca (2023) Artificial intelligence enhances digital asset management. PhD thesis, Politecnico di Milano, Italy.

Ramsey, D; El Asmar, M and Gibson, G E (2016) Quantitative performance assessment of single-step versus two-step design-build procurement. Journal of Construction Engineering and Management, 142(9): 04016033, ISSN 0733-9364

Randeree, K and Chaudhry, A G (2012) Leadership: style, satisfaction and commitment: An exploration in the United Arab Emirates' construction sector. Engineering, Construction and Architectural Management, 19(1), pp. 61-85. ISSN 0969-9988

Raouf, A M and Al-Ghamdi, S G (2019) Effectiveness of project delivery systems in executing green buildings. Journal of Construction Engineering and Management, 145(10): 03119005, ISSN 0733-9364

Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(2), pp. 253-267. ISSN 1562-3599

Rasdorf, W J and Herbert, M J (1990) Bar coding in construction engineering. Journal of Construction Engineering and Management, 116(2), pp. 261-280. ISSN 0733-9364

Rashdan, W. and Ashour, A. F. (2026) A conceptual framework linking biophilic interior design to sustainability criteria. Building Research & Information, 54(6), pp. 775-800. ISSN 0961-3218

Rashed, A (2022) Influence of internal factors in construction organizations on the implementation of integrated project delivery viewed from the organizational change theory. PhD thesis, Illinois Institute of Technology, USA.

Rashed, A and Mutis, I (2023) Trends of integrated project delivery implementations viewed from an emerging innovation framework. Engineering, Construction and Architectural Management, 30(3), pp. 989-1014. ISSN 0969-9988

Rasheed, E. O. and Wang, K. (2026) Do overall findings correlate with granular findings? An analysis of factors influencing office workers' thermal comfort and indoor air quality. International Journal of Building Pathology and Adaptation, 44(5), pp. 1211-1231. ISSN 2398-4708

Rashid, R A (1998) A model for an effective implementation of the government technology transfer policy in the Malaysian construction industry. PhD thesis, University of Reading, UK.

Rashidi, A.; Sarvari, H.; Chan, D. W. M.; Olawumi, T. O. and Edwards, D. J. (2026) A systematic taxonomic review of the application of BIM and digital twins technologies in the construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 1813-1835. ISSN 0969-9988

Rashidi, A; Yong, W Y; Maxwell, D and Fang, Y (2023) Construction planning through 4D BIM-based virtual reality for light steel framing building projects. Smart and Sustainable Built Environment, 12(5), pp. 1153-1173. ISSN 2046-6099

Rasoulimanesh, M.; Rahai, A. and Shahhosseini, V. (2025) An integrated decision support system for strategic budget/resource allocation in bridge infrastructure management based on digital technologies. Smart and Sustainable Built Environment, 15(5), pp. 1939-1966. ISSN 2046-6099

Rathnayake, A and Middleton, C (2023) Systematic review of the literature on construction productivity. Journal of Construction Engineering and Management, 149(6): 03123005, ISSN 0733-9364

Ratnasabapathy, S; Alashwal, A and Perera, S (2021) Investigation of waste diversion rates in the construction and demolition sector in Australia. Built Environment Project and Asset Management, 11(3), pp. 427-439. ISSN 2044-124X

Rausch, C; Lu, R; Talebi, S and Haas, C (2023) Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 23(3), pp. 565-578. ISSN 1562-3599

Rauscher, Kimberly (2024) Successful strategies government executive stakeholders use to mitigate higher project costs and user adoption failure rates. DBA thesis, Walden University, USA.

Raval, P; Sarkar, D and Solanki, A (2026) A comparative analysis of the application of fuzzy ANP and fuzzy TOPSIS methods for integrated building information modelling (BIM) and blockchain adoption in the construction sector. International Journal of Construction Management, 26(4), pp. 694-717. ISSN 1562-3599

Raval, P and Sarkar, D (2025) Evaluation and optimization of key performance indicators affecting adoption of the building information modeling and blockchain technology in Indian construction sector through fuzzy TOPSIS and genetic algorithm. International Journal of Construction Management, 25(9), pp. 981-995. ISSN 1562-3599

Raviv, G; Shapira, A and Sacks, R (2022) Empirical investigation of the applicability of constructability methods to prevent design errors. Built Environment Project and Asset Management, 12(1), pp. 53-69. ISSN 2044-124X

Razkenari, M A (2019) Framework for measuring industrialized construction maturity. PhD thesis, University of Florida, USA.

Reddrick, L A (2023) Leadership strategies for modeling ethical behavior in the real estate industry. DBA thesis, Walden University, USA.

Reid, J S (2019) Evaluating the impact of using agile methodologies in heavy-civil construction. DEng thesis, George Washington University, USA.

Reinschmidt, K and Trejo, D (2006) Economic value of building faster. Journal of Construction Engineering and Management, 132(7), pp. 759-766. ISSN 0733-9364

Reis, Sonia (2023) Career optimism of civil engineers in Australia. PhD thesis, Queensland University of Technology, Australia.

Reisi, R. and Ghoddousi, P. (2025) The influence of emotional intelligence on job satisfaction and organizational commitment in tehran's construction industry: A structural equation modeling approach. Engineering, Construction and Architectural Management, 33(5), pp. 3718-3736. ISSN 0969-9988

Ren, Z (2002) A multi-agent systems approach to construction claims negotiation. PhD thesis, Loughborough University, UK.

Ren, Z; Anumba, G J and Ugwu, O O (2001) Construction claims management: Towards an agent-based approach. Engineering, Construction and Architectural Management, 8(3), pp. 185-197. ISSN 0969-9988

Reynolds, M F (1990) Facilities planning and construction internship. DEng thesis, Texas A&M University, USA.

Rezgui, Y and Zarli, A (2006) Paving the way to the vision of digital construction: A strategic roadmap. Journal of Construction Engineering and Management, 132(7), pp. 767-776. ISSN 0733-9364

Rezvani, A; Ashkanasy, N and Khosravi, P (2020) Key attitudes: Unlocking the relationships between emotional intelligence and performance in construction projects. Journal of Construction Engineering and Management, 146(4): 04020025, ISSN 0733-9364

Ribeiro, F L (1998) Project delivery methods for large scale building projects: A case study. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Ribeiro, F L (1998) Delivering large scale building projects: a case study. Journal of Construction Procurement, 4(2), pp. 77-88. ISSN 1358-9180

Ribeiro, F L (2001) BOT model: The Portuguese case. Journal of Construction Procurement, 7(2), pp. 72-86. ISSN 1358-9180

Riel, Paul E (2015) Campus planners' preferences for residence hall project delivery methods. EdD thesis, University of North Florida, USA.

Rigby, E T; McCoy, A P and Garvin, M J (2012) Toward aligning academic and industry understanding of innovation in the construction industry. International Journal of Construction Education and Research, 8(4), pp. 243-259. ISSN 1557-8771

Rihani, R A (2006) An investigation of critical success factors for robotic masonry. PhD thesis, North Carolina State University, USA.

Riley, F G (2018) Information behaviour in construction project management teams: contradictions, motivations and influencing factors. PhD thesis, University of Leeds, UK.

Riley, M J (2001) Re-engineering the construction procurement process. PhD thesis, University of Southampton, UK.

Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.

Rivera, A O (2017) Shifting from management to leadership: A procurement model adaptation to project management. PhD thesis, Arizona State University, USA.

Riverso, M E (1984) A life cycle cost system for value engineering in building design and construction (economic, cost-codes, database). PhD thesis, Purdue University, USA.

Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364

Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. PhD thesis, Texas A&M University, USA.

Roberts, W E (1985) An analysis of conflict arising between architects and school personnel when planning, designing, and constructing school facilities. EdD thesis, Northern Arizona University, USA.

Robinson, A C (2017) ISBU modular construction and building design prototypes. EngD thesis, Loughborough University, UK.

Robinson, Benjamin Tyrell (2021) Identifying and pricing risk in residential development. PhD thesis, RMIT University, Australia.

Robinson, H S; Carrillo, P M; Anumba, C J and Al-Ghassani, A M (2001) Linking knowledge management strategy to business performance in construction organizations. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Robles, J (2023) Fast-track projects with cost and schedule overruns: A supply chain management perspective. DBA thesis, Capella University, USA.

Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.

Rodrigo, M N N; Perera, S; Senaratne, S and Jin, X (2022) Systematic development of a data model for the blockchain-based embodied carbon (bec) estimator for construction. Engineering, Construction and Architectural Management, 29(9), pp. 3311-3330. ISSN 0969-9988

Rodrigues, F; Antunes, F and Matos, R (2021) Safety plugins for risks prevention through design resourcing BIM. Construction Innovation, 21(2), pp. 244-258. ISSN 1471-4175

Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175

Rodrigues Aragao, R (2018) Using network theory to manage knowledge from unstructured data in construction projects: Application to a collaborative analysis of the energy consumption in the construction of oil and gas facilities. PhD thesis, University of Toronto, Canada.

Rodriguez, C M; Medina, J M and Pinzón, A (2019) Thermal comfort and satisfaction in the context of social housing: Case study in Bogotá, Colombia. Journal of Construction in Developing Countries, 24(1), pp. 101-124. ISSN 1823-6499

Rodriguez Bernal, C M (2017) Student-centred strategies to integrate theoretical knowledge into project development within architectural technology lecture-based modules. Architectural Engineering and Design Management, 13(3), pp. 223-242. ISSN 1745-2007

Rodriguez-Labajos, L; Thomson, C and O'Brien, G (2016) Exploring the attributes and KPIs adopted by international healthcare providers to measure the performance of their estates at the strategic level. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Rogers, M (2000) Using ELECTRE to aid the choice of housing construction process within structural engineering. Construction Management and Economics, 18(3), pp. 333-342. ISSN 01446193

Roghanian, E; Alipour, M and Rezaei, M (2018) An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management, 18(1), pp. 1-13. ISSN 1562-3599

Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988

Rohman, M A; Doloi, H and Heywood, C A (2017) Success criteria of toll road projects from a community societal perspective. Built Environment Project and Asset Management, 7(1), pp. 32-44. ISSN 2044-124X

Rohman, Mohammad Arif (2017) Stakeholders' perspective on achieving project social benefit from Indonesian toll roads. PhD thesis, University of Melbourne, Australia.

Rojas, E M and Kell, I (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387-397. ISSN 0733-9364

Ronzani, M (2019) Designing for complexity: Data visualizations in megaproject management. PhD thesis, University of Edinburgh, UK.

Roofigari-Esfahan, N; Paez, A and N.razavi, S (2015) Location-aware scheduling and control of linear projects: Introducing space-time float prisms. Journal of Construction Engineering and Management, 141(1): 06014008, ISSN 0733-9364

Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-aware linear schedule optimization: A space-time constraint-satisfaction approach. Journal of Construction Engineering and Management, 143(5): 04016132, ISSN 0733-9364

Rooke, C N; Rooke, J A; Koskela, L and Tzortzopoulos, P (2010) Using the physical properties of artefacts to manage through-life knowledge flows in the built environment: An initial exploration. Construction Management and Economics, 28(6), pp. 601-613. ISSN 1466433X

Rooke, J A; Koskela, L and Seymour, D (2007) Producing things or production flows? Ontological assumptions in the thinking of managers and professionals in construction. Construction Management and Economics, 25(10), pp. 1077-1085. ISSN 1466433X

Rooney P, A R (2013) A case study of changing procurement practices on delivery of highways projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Rose, T M and Manley, K (2014) Revisiting the adoption of innovative products on Australian road infrastructure projects. Construction Management and Economics, 32(9), pp. 904-917. ISSN 01446193

Roshani, D (2005) Integrated collaborative building design using internet technology. PhD thesis, University of Nottingham, UK.

Ross, A and Goulding, J (2007) Supply chain transactional barriers to design cost management. Construction Innovation, 7(3), pp. 274-287. ISSN 1471-4175

Rotimi, E O O; Rotimi, F E; Silva, C W C and Aigwi, I E (2024) BIM knowledge transfer in construction industry: A partial least square analysis. Journal of Engineering, Design and Technology, 22(4), pp. 1393-1411. ISSN 1726-0531

Rotimi, F E (2013) An evaluative framework for defects in new residential buildings: The New Zealand case. PhD thesis, Auckland University of Technology, New Zealand.

Rotimi, F E; Rotimi, J O B; Silva, C W C; Olatunji, O A and Ramanayaka, C E D (2023) The determinants of job satisfaction amongst specific migrant construction workers. Built Environment Project and Asset Management, 13(5), pp. 738-755. ISSN 2044-124X

Rotimi, F E; Tookey, J; Craig, N and Rotimi, J O B (2011) Opportunities for defect reporting in new residential buildings: A case for New Zealand. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Rotimi, J O B; Ramanayaka, C D E; Olatunji, O A and Rotimi, F E (2023) Migrant construction workers' demography and job satisfaction: A new zealand study. Engineering, Construction and Architectural Management, 30(3), pp. 1122-1145. ISSN 0969-9988

Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.

Roulet, C A; Flourentzou, F; Foradini, F; Bluyssen, P; Cox, C and Aizlewood, C (2006) Multicriteria analysis of health, comfort and energy efficiency in buildings. Building Research & Information, 34(5), pp. 475-482. ISSN 0961-3218

Roulet, C A; Johner, N; Foradini, F; Bluyssen, P; Cox, C; De Oliveira Fernandes, E; Müller, B and Aizlewood, C (2006) Perceived health and comfort in relation to energy use and building characteristics. Building Research & Information, 34(5), pp. 467-474. ISSN 0961-3218

Roumboutsos, A and Macário, R M R (2013) Public private partnerships in transport: Theory and practice. Built Environment Project and Asset Management, 3(2), pp. 160-164. ISSN 2044-124X

Roumboutsos, A; Suárez Alemán, A and Ågren, R (2017) Construction firms in public-private partnerships: A place to grow. Construction Management and Economics, 35(10), pp. 627-640. ISSN 0144-6193

Rounds, J L and Chi, N Y (1985) Total quality management for construction. Journal of Construction Engineering and Management, 111(2), pp. 117-128. ISSN 0733-9364

Rovers, R (2014) New energy retrofit concept: 'Renovation trains' for mass housing. Building Research & Information, 42(6), pp. 757-767. ISSN 0961-3218

Rowings, J E; Federle, M O and Birkland, S A (1996) Characteristics of the craft workforce. Journal of Construction Engineering and Management, 122(1), pp. 83-90. ISSN 0733-9364

Rowlinson, S (2007) The temporal nature of forces acting on innovative IT in major construction projects. Construction Management and Economics, 25(3), pp. 227-238. ISSN 1466433X

Roy, N C and Roy, N G (2022) Sustainable hydroelectric power project planning under socio-economic and environmental concerns using index based approach. Built Environment Project and Asset Management, 12(3), pp. 401-432. ISSN 2044-124X

Ruan, X; Ochieng, E G; Price, A D and Egbu, C (2013) Time for a real shift to relations: Appraisal of social network analysis applications in the UK construction industry. Construction Economics and Building, 13(1), pp. 92-105. ISSN 2204-9029

Ruan, X; Ochieng, E G and Price, A D F (2011) The evaluation of social network analysis application s in the UK construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Ruddock, S (2009) Assessment of the built environment for healthcare: A case study in the development of an evaluation framework. PhD thesis, University of Salford, UK.

Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193

Ruikar, K; Anumba, C J and Carrillo, P M (2005) End-user perspectives on use of project extranets in construction organisations. Engineering, Construction and Architectural Management, 12(3), pp. 222-235. ISSN 0969-9988

Ruiz, J A; Granja, A D and Kowaltowski, D C C K (2014) Cost reallocation in social housing projects considering the desired values of end-users. Built Environment Project and Asset Management, 4(4), pp. 352-367. ISSN 2044-124X

Runeson, G and de Valence, G (2015) A critique of the methodology of building economics: Trust the theories. Construction Management and Economics, 33(2), pp. 117-125. ISSN 01446193

Russell, E F (2020) Leading role or bit player? Main contractors, supply chain and sustainable construction. PhD thesis, University of Surrey, UK.

Ruthankoon, R and Ogunlana, S O (2003) Testing herzberg's two-factor theory in the Thai construction industry. Engineering, Construction and Architectural Management, 10(5), pp. 333-341. ISSN 0969-9988

Ruwanpura, U D R E and Perera, B A K S (2023) Management of external stakeholders' influences in donor-funded irrigation infrastructure projects in sri lanka. Smart and Sustainable Built Environment, 12(4), pp. 820-846. ISSN 2046-6099

Rwelamila, P D (1994) Group dynamics and construction project manager. Journal of Construction Engineering and Management, 120(1), pp. 3-10. ISSN 0733-9364

Rwelamila P D, H C M S (2013) Capacity building in emerging economies through international construction ventures: Case study of the nmpp project. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ryall, P (2012) Implementation and the effectiveness of quality management systems within the construction industry and organisational change management in this process. PhD thesis, University of South Wales, UK.

Ryan, E C (1998) Devising contract terms in construction contracts to produce efficient performance. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Ryan, Peter William Joseph (2017) Unlocking the key to mega project delivery. PhD thesis, University of Melbourne, Australia.

Ryd, N V (2003) Exploring construction briefing: From document to process. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Saad, A; Ajayi, S O and Alaka, H A (2023) Trends in BIM-based plugins development for construction activities: A systematic review. International Journal of Construction Management, 23(16), pp. 2756-2768. ISSN 1562-3599

Saad, A; Zahid, S M and Muhammad, U B (2022) Role of awareness in strengthening the relationship between stakeholder management and project success in the construction industry of Pakistan. International Journal of Construction Management, 22(10), pp. 1884-1893. ISSN 1562-3599

Saad, I M H and Hancher, D E (1998) Multimedia for construction project management: Project navigator. Journal of Construction Engineering and Management, 124(1), pp. 82-89. ISSN 0733-9364

Saade, M R M; da Silva, M G; Gomes, V; Franco, H G; Schwamback, D and Lavor, B (2014) Material eco-efficiency indicators for Brazilian buildings. Smart and Sustainable Built Environment, 3(1), pp. 54-71. ISSN 2046-6099

Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218

Sabitu Oyegoke, A (2001) UK and US construction management contracting procedures and practices: A comparative study. Engineering, Construction and Architectural Management, 8(5-6), pp. 403-417. ISSN 0969-9988

Sabow, H (2011) The impact of organisational culture on the dimensions of pay satisfaction in private and public construction firms in Libya. PhD thesis, University of Salford, UK.

Sacks, R; Eastman, C M and Lee, G (2004) Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry. Journal of Construction Engineering and Management, 130(2), pp. 206-215. ISSN 0733-9364

Sacks, R and Goldin, M (2007) Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(5), pp. 374-384. ISSN 0733-9364

Sacks, R and Partouche, R (2010) Empire State Building project: Archetype of "mass construction". Journal of Construction Engineering and Management, 136(6), pp. 702-710. ISSN 0733-9364

Sacks, R; Treckmann, M and Rozenfeld, O (2009) Visualization of work flow to support lean construction. Journal of Construction Engineering and Management, 135(12), pp. 1307-1315. ISSN 0733-9364

Sadeghi, B (2024) Selecting Industry 4.0 technologies for construction activities using clustering analysis and text mining. PhD thesis, University of Wisconsin - Milwaukee, USA.

Sadeghi, H; Cheung, C M; Yunusa-Kaltungo, A and Manu, P (2024) Occupational safety and health in modular integrated construction: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Sadeh, H; Mirarchi, C and Pavan, A (2021) Integrated approach to construction risk management: Cost implications. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364

Safa, M; Shahi, A; Haas, C T and Hipel, K W (2017) Construction contract management using value packaging systems. International Journal of Construction Management, 17(1), pp. 50-64. ISSN 1562-3599

Safari, M (2019) A regenerative approach to development and construction of building energy retrofit projects. PhD thesis, Pennsylvania State University, USA.

Sagar, S K (2017) Model for assessment of trust within virtual project teams of construction sector in the Middle East. PhD thesis, University of Salford, UK.

Sagar, S K; Arif, M; Oladinrin, O T and Rana, M Q (2022) Challenges negating virtual construction project team performance in the middle East. Built Environment Project and Asset Management, 12(4), pp. 613-629. ISSN 2044-124X

Sagar, S K; Oladinrin, O T; Arif, M and Rana, M Q (2023) Interpretive structural model of trust factors in construction virtual project teams. Construction Innovation, 23(1), pp. 248-264. ISSN 1471-4175

Saha, S; Greville, C J and Mullins, T A (2001) Optimisation of construction process inspection rates using a learning approach. Construction Economics and Building, 1(2), pp. 1-13. ISSN 2204-9029

Sahebzamani, E and Forcada, N (2026) Enhancing sustainable construction decisions: Integrating BIM and VR for circular economy assessment. Building Research & Information, 54(1), pp. 79-99. ISSN 0961-3218

Said, H. and Cao, J. (2026) Optimizing building prefabrication strategies by balancing modularity and complicatedness. Journal of Construction Engineering and Management, 152(7): 04026097, ISSN 0733-9364

Sajuyigbe, Ademola Samuel; Ogundare, Olusegun Samuel; Sanusi, Bolanle Mistura; Akinbobola, Abiola Olubunmi; Tella, Adeniran Rahman and Obi, Nwoye James (2026) Assessing the mediating role of project management training on the nexus between job satisfaction and project performance in the Nigerian construction industry. Journal of Construction Business and Management, 8(2), pp. 1-14. ISSN 2521-0165

Salam, M; Killen, C and Forsythe, P (2025) Assessing interdisciplinary collaboration in the detailed design phase of construction projects: applying practice-based inter-organisational theories. International Journal of Construction Management, 25(2), pp. 238-247. ISSN 1562-3599

Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175

Salama M, H A R (2013) UAE green building strategic model. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Salameh, M; Touqan, B and Suliman, A (2024) Enhancing student satisfaction and academic performance through school courtyard design: A quantitative analysis. Architectural Engineering and Design Management, 20(4), pp. 911-927. ISSN 1745-2007

Salcedo Rahola, T B (2015) Integrated project delivery methods for energy renovation of social housing. PhD thesis, Delft University of Technology, Netherlands.

Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.

Saleh, Iraj (1997) The shadow pricing of labour in cost benefit analysis of infrastructure projects: Theory and application to sydney's second airport project. PhD thesis, University of Western Sydney, Australia.

Saleh, Nour M M (2025) Post-disaster management in housing reconstruction. DEng thesis, Technische Universitaet Berlin, Germany.

Salem, M A (1985) Motivation of national and expatriate construction workers in Jordan. PhD thesis, University of Michigan, USA.

Salhab, D; Pourrahimian, E and Hamzeh, F (2026) Integrating ontologies and AI for enhanced workspace planning and knowledge management. Journal of Construction Engineering and Management, 152(4): 04026031, ISSN 0733-9364

Salih, F; Eissa, R and El-Adaway, I H (2024) Data-driven analysis of progressive design build in water and wastewater infrastructure projects. Journal of Construction Engineering and Management, 150(1): 04023149, ISSN 0733-9364

Salleh, A G and Badarulzaman, N (2012) Quality of life of residents in urban neighbourhoods of Pulau Pinang, Malaysia. Journal of Construction in Developing Countries, 17(2), pp. 117-123. ISSN 1823-6499

Salminen, J (2005) Measuring performance and determining success factors of construction sites. PhD thesis, Helsinki University of Technology, Finland.

Salvado, F; de Almeida, N M and Azevedo, Á V E (2019) Historical analysis of the economic life-cycle performance of public school buildings. Building Research & Information, 47(7), pp. 813-832. ISSN 0961-3218

Salvatierra, J L; Gálvez, M Á; Bastías, F; Castillo, T; Herrera, R F and Alarcón, L F (2019) Developing a benchmarking system for architecture design firms. Engineering, Construction and Architectural Management, 26(1), pp. 139-152. ISSN 0969-9988

Samaraweera, A; Senaratne, S and Sandanayake, Y G (2018) Methodology to extract underlying basic assumptions of a public sector construction project culture: An exploratory case study. International Journal of Construction Management, 18(6), pp. 467-481. ISSN 1562-3599

Sami Kashkooli, A M (2013) A critical building lifecycle assessment framework for building designers and decision makers. PhD thesis, University of Sheffield, UK.

Samman, R A and Graham, I (2007) The six sigma project management strategy. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Samsami, R (2022) A framework for active construction inspection and visualization using uas. PhD thesis, Michigan Technological University, USA.

Samwinga, V and Proverbs, D (2003) The repair of flood damaged property: A critical review of the needs of homeowners. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

San Cristóbal, J R (2009) Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), pp. 1271-1274. ISSN 0733-9364

Sanboskani, H (2024) The implementation of integrated delivery and management in large government-owned engineering construction projects. PhD thesis, Arizona State University, USA.

Sanchez X, A; Lehtiranta, L; Hampson, K D and Kenley, R (2014) Evaluation framework for green procurement in road construction. Smart and Sustainable Built Environment, 3(2), pp. 153-169. ISSN 2046-6099

Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364

Sandanayake, M; Yang, W; Chhibba, N and Vrcelj, Z (2022) Residential building defects investigation and mitigation: a comparative review in Victoria, Australia, for understanding the way forward. Engineering, Construction and Architectural Management, 29(9), pp. 3689-3711. ISSN 0969-9988

Sandhyavitri, A (2022) Stochastic analyses for managing risk of delay in duri oil construction projects, Indonesia. International Journal of Construction Management, 22(4), pp. 711-731. ISSN 1562-3599

Sands, K S and Suh, M J (2026) Roofers' perceptions on topics of heat safety. International Journal of Construction Education and Research, 22(1), pp. 53-71. ISSN 1557-8771

Sandy, G C (1981) An evaluative comparison of the satisfaction with the utility of new buildings versus library additions and addition/renovations. PhD thesis, Florida State University, USA.

Sang, L; Yu, M; Lin, H; Zhang, Z and Jin, R (2021) Big data, technology capability and construction project quality: A cross-level investigation. Engineering, Construction and Architectural Management, 28(3), pp. 706-727. ISSN 0969-9988

Sani, H (1988) An investigation into the influences upon and determinants of perceived quality achievement in the management of construction projects by multivariate analysis. PhD thesis, Heriot-Watt University, UK.

Sankaran, B and O'Brien, W J (2018) Bayesian second-order factor model for maturity assessment of CIM technologies and practices at highway agencies. Journal of Construction Engineering and Management, 144(4): 04018015, ISSN 0733-9364

Sankaran, B and O'Brien, W J (2018) Impact of CIM technologies and agency policies on performance for highway infrastructure projects. Journal of Construction Engineering and Management, 144(7): 04018052, ISSN 0733-9364

Sankaran, Bharathwaj (2017) Civil integrated management for highway infrastructure projects: Analyses of trends, specifications, impact, and maturity. PhD thesis, University of Texas at Austin, USA.

Sanni, A A and Windapo, A O (2008) Evaluation of contractor’s quality control practices on construction sites in Nigeria. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Sanni-Anibire, M O and Adenle, Y A (2024) Residential satisfaction of vertical urban settlements in Hong Kong. Journal of Engineering, Design and Technology, 22(6), pp. 1705-1722. ISSN 1726-0531

Santamaria Carrera, J L (2017) Quantifying the effect of construction site factors on concrete quality, costs and production rates. PhD thesis, University of New Mexico, USA.

Sapountzis, S (2013) An investigation into the development of an effective benefits realisation process for healthcare infrastructure projects. PhD thesis, University of Salford, UK.

Sapri, M (2008) Using the repertory grid technique for the appraisal of facilities performance within higher education institutions: Library case study. PhD thesis, Heriot-Watt University, UK.

Saradara, S M; Lara, J C F; Swarnakar, V; Rauf, A; Qureshi, R; Fadel, M E and Khalfan, M M A (2024) Construction and demolition waste management in the United Arab Emirates through the 3R principle. Engineering, Construction and Architectural Management, 31(13), pp. 430-454. ISSN 0969-9988

Sardén, Y and Engström, S (2010) Modern methods of construction: A solution for an industry characterized by uncertainty? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Sardén, Y and Stehn, L (2005) Managing transformation, flow and value generation: A solid timber frame housing case. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sarhan, S; Pretlove, S; Elghaish, F; Matarneh, S and Mossman, A (2025) Sources of occupational stress in UK construction projects: An empirical investigation and agenda for future research. Smart and Sustainable Built Environment, 14(6), pp. 1701-1728. ISSN 2046-6099

Sarhan, Jamil Ghazi I (2018) Development of a lean construction framework for the Saudi Arabian construction industry. PhD thesis, Queensland University of Technology, Australia.

Sarhan, S and Fox, A (2013) Performance measurement in the UK construction industry and its role in supporting the application of lean construction concepts. Construction Economics and Building, 13(1), pp. 23-35. ISSN 2204-9029

Sari, R. and Pekeriçli, M. K. (2026) Possibility of personalization and customization of the workplace by knowledge workers. Building Research & Information, 54(4), pp. 410-428. ISSN 0961-3218

Sari, K (2019) A framework for lean implementation in infrastructure construction in the UK. PhD thesis, University of Salford, UK.

Sarigul, F. H. and Gunaydin, H. M. (2026) Integrated BIM, GIS and interoperable digital technologies in lifecycle management of building construction projects: Systematic literature review. Smart and Sustainable Built Environment, 15(5), pp. 1808-1845. ISSN 2046-6099

Sarkar, D and Solanki, A (2024) Application of Internet of Things and Cloud Computing for Evaluation of Key Performance Indicators for Indian Construction Projects through Consistent Fuzzy Preference Relations Approach. Journal of Construction in Developing Countries, 29(2), pp. 83-115. ISSN 1823-6499

Sarshar, M; Haigh, R and Amaratunga, D (2004) Improving project processes: Best practice case study. Construction Innovation, 4(2), pp. 69-82. ISSN 1471-4175

Sattary, S and Thorpe, D (2012) Optimizing embodied energy of building construction through bioclimatic principles. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Saunders, L W (2013) Measuring safety attitude differences in the construction supply chain. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Saurin, T A; Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(3), pp. 283-298. ISSN 0969-9988

Saurin, T A; Formoso, C T and Guimaraes, L B M (2004) Safety and production: An integrated planning and control model. Construction Management and Economics, 22(2), pp. 159-169. ISSN 01446193

Savaş, S; Acar, E and Acar, D (2024) A project management model for architectural restoration projects. International Journal of Construction Management, 24(15), pp. 1698-1707. ISSN 1562-3599

Savicky, J (2023) Exploration of solicitation optimization within the built environment. PhD thesis, Arizona State University, USA.

Savolainen, J M; Saari, A; Männistö, A and Kähkonen, K (2018) Indicators of collaborative design management in construction projects. Journal of Engineering, Design and Technology, 16(4), pp. 674-691. ISSN 1726-0531

Sawhney, A; Walsh, K D; Bashford, H H and Palaniappan, S (2009) Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management, 135(4), pp. 319-329. ISSN 0733-9364

Sayed Suleiman, R (2019) Understanding site offices challenges to communicate and exchange information using technology in UK: main contractor perspective. PhD thesis, University of Salford, UK.

Schiavi, B; Havard, V; Beddiar, K and Baudry, D (2023) A VR training scenario editor for operation in construction based on bim 4D and domain expert authoring. Smart and Sustainable Built Environment, 12(5), pp. 1074-1089. ISSN 2046-6099

Schmitt, R L (1998) Development of statistically based methods to determine QC/QA testing levels for hot-mix asphalt construction. PhD thesis, University of Wisconsin - Madison, USA.

Schröpfer, V (2013) Social network analysis of knowledge transfer in sustainable office building projects in the UK and Germany. PhD thesis, Oxford Brookes University, UK.

Schultz, C S; Jørgensen, K; Bonke, S and Rasmussen, G M G (2015) Building defects in Danish construction: Project characteristics influencing the occurrence of defects at handover. Architectural Engineering and Design Management, 11(6), pp. 423-439. ISSN 1745-2007

Schweber, L. and Green, M. (2026) Negotiating net-zero carbon: An ant analysis of two buildings. Buildings & Cities, 7(1), pp. 791-807. ISSN 2632-6655

Schweber, L and Haroglu, H (2014) Comparing the fit between BREEAM assessment and design processes. Building Research & Information, 42(3), pp. 300-317. ISSN 0961-3218

Scott, D and Yang, J (1991) Setting the pace with paces: A new concept of using an expert system for project analysis and control. Construction Management and Economics, 9(6), pp. 529-541. ISSN 01446193

Scott, L and Kanjanabootra, S (2019) The productivity, performance and quality paradox: An alternative perspective. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(6), pp. 945-961. ISSN 0969-9988

Sebastian, R (2010) Integrated design and engineering using building information modelling: A pilot project of small-scale housing development in the Netherlands. Architectural Engineering and Design Management, 6(2), pp. 103-110. ISSN 1745-2007

Sebastian, R; Claeson-Jonsson, C and Di Giulio, R (2013) Performance-based procurement for low-disturbance bridge construction projects. Construction Innovation, 13(4), pp. 394-409. ISSN 1471-4175

Seethapathy, S and Henderson, J H (2017) Management of construction waste in nuclear and thermal power plant projects in India. Journal of Construction in Developing Countries, 22(S1), pp. 19-46. ISSN 1823-6499

Selcuk, O; Turkoglu, H; Polat, G and Hajdu, M (2024) An integrative literature review on the causes of delays in construction projects: Evidence from developing countries. International Journal of Construction Management, 24(6), pp. 610-622. ISSN 1562-3599

Selĺs, M E S; Rubio, J A C and Mullor, J R (2008) Development of a quantification proposal for hidden quality costs: Applied to the construction sector. Journal of Construction Engineering and Management, 134(10), pp. 749-757. ISSN 0733-9364

Senanayake, S M A H; Gunawardana, P A M; Perera, B A K S and Rajaratnam, D (2024) Examining the potential use of augmented reality in construction cost management tools and techniques. Journal of Engineering, Design and Technology, 22(6), pp. 1847-1869. ISSN 1726-0531

Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. PhD thesis, University of Salford, UK.

Senaratne, S and Hapuarachchi, A (2009) Construction project teams and their development: Case studies in Sri Lanka. Architectural Engineering and Design Management, 5(4), pp. 215-224. ISSN 1745-2007

Senaratne, S and Hewamanage, P R (2015) The role of team leadership in achieving LEED certification in a green building project. Built Environment Project and Asset Management, 5(2), pp. 170-183. ISSN 2044-124X

Senaratne, S and Jayarathna, T (2012) Quality planning process of construction contractors: Case studies in Sri Lanka. Journal of Construction in Developing Countries, 17(1), pp. 103-115. ISSN 1823-6499

Senaratne, S; Kc, A and Rai, S (2024) Stakeholder management challenges and strategies for sustainability issues in megaprojects: Case studies from Australia. Built Environment Project and Asset Management, 14(3), pp. 414-431. ISSN 2044-124X

Senaratne, S and Malewana, C (2011) Linking individual, team and organizational learning in construction project team settings. Architectural Engineering and Design Management, 7(1), pp. 50-63. ISSN 1745-2007

Senaratne, S and Mayuran, J (2015) Documentation management based on ISO for construction industries in developing countries. Journal of Construction in Developing Countries, 20(2), pp. 81-95. ISSN 1823-6499

Senaratne, S and Ruwanpura, M (2016) Communication in construction: A management perspective through case studies in Sri Lanka. Architectural Engineering and Design Management, 12(1), pp. 3-18. ISSN 1745-2007

Senaratne, S and Samaraweera, A (2015) Construction project leadership across the team development process. Built Environment Project and Asset Management, 5(1), pp. 69-88. ISSN 2044-124X

Senaratne, S and Sexton, M (2008) Managing construction project change: A knowledge management perspective. Construction Management and Economics, 26(12), pp. 1303-1311. ISSN 1466433X

Senaratne, S and Sexton, M G (2004) Managing construction project change in the knowledge age: A case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(2), pp. 186-200. ISSN 0969-9988

Senaratne, S and Udawatta, N (2013) Managing intragroup conflicts in construction project teams: Case studies in Sri Lanka. Architectural Engineering and Design Management, 9(3), pp. 158-175. ISSN 1745-2007

Senescu, R R (2011) Design process communication methodology. PhD thesis, Stanford University, USA.

Senghore, O; Hastak, M; Abdelhamid, T S; AbuHammad, A and Syal, M G (2004) Production process for manufactured housing. Journal of Construction Engineering and Management, 130(5), pp. 708-718. ISSN 0733-9364

Sepp nen, O (2009) Empirical research on the success of production control in building construction projects. PhD thesis, Helsinki University of Technology, Finland.

Seppänen, O; Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(6), pp. 608-624. ISSN 01446193

Seraphim, D l (2006) Implementing TQM principles in a construction company in the UAE. PhD thesis, University of South Wales, UK.

Serugga, J (2020) A decision support system for benefits realisation in front end design of construction projects in dynamic contexts. PhD thesis, University of Huddersfield, UK.

Serugga, J; Kagioglou, M; Edwards, D; Talebi, S and Johns, N (2024) Key influences to cost modelling and analysis in off-site construction: Research trends and gap analysis. Architectural Engineering and Design Management, 20(6), pp. 1335-1356. ISSN 1745-2007

Seyed-Alangi, F; Parchami-Jalal, M and Noorzai, E (2026) The challenges of risk and reward sharing in the implementation of integrated project delivery contracts in the Iranian construction industry. International Journal of Construction Education and Research, 22(1), pp. 72-95. ISSN 1557-8771

Seyis, S; Ergen, E and Pizzi, E (2016) Identification of waste types and their root causes in green-building project delivery process. Journal of Construction Engineering and Management, 142(2): 04015059, ISSN 0733-9364

Seyis, S and Ozkan, S (2024) Benefits and challenges of implementing the common data environments in the construction phase of BIM-based projects. Journal of Construction Engineering and Management, 150(8): 04024091, ISSN 0733-9364

Seymour, D and Low, S P (1990) The quality debate. Construction Management and Economics, 8(1), pp. 13-29. ISSN 01446193

Seymour, D; Shammas-Toma, M and Clark, L (1997) Limitations of the use of tolerances for communicating design requirements to site. Engineering, Construction and Architectural Management, 4(1), pp. 3-22. ISSN 0969-9988

Sezer, A A (2013) Indicators of environmental and productivity performance for building refurbishment projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(2), pp. 141-153. ISSN 2044-124X

Sezer, A A (2016) Construction performance measurement: Site managers in refurbishment projects. PhD thesis, Chalmers University of Technology, Sweden.

Shabani Ardakani, S and Nik-Bakht, M (2021) Functional evaluation of change order and invoice management processes under different procurement strategies: Social network analysis approach. Journal of Construction Engineering and Management, 147(1): 1974, ISSN 0733-9364

Shafique, F (2020) Transformational leadership for sustainability in architecture engineering and construction project teams. PhD thesis, Michigan State University, USA.

Shafique, F and Mollaoglu, S (2022) Shared transformational leadership for green architecture engineering and construction project teams: A study of LEED projects. Journal of Construction Engineering and Management, 148(12): 04022137, ISSN 0733-9364

Shah, M N; Dixit, S; Kumar, R; Jain, R and Anand, K (2021) Causes of delays in slum reconstruction projects in India. International Journal of Construction Management, 21(5), pp. 452-467. ISSN 1562-3599

Shah R, W S R A (2013) Challenges and solutions for management of FRP usage in the UK rail sector. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Shahandashti, M; Ashuri, B and Mostaan, K (2018) Automatic fault detection for building integrated photovoltaic (BIPV) systems using time series methods. Built Environment Project and Asset Management, 8(2), pp. 160-170. ISSN 2044-124X

Shahrin, F and Udeaja, C (2019) Evaluation of the challenges in using building information modelling to improve client’s requirements delivery. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Shahruddin, S; Zairul, M and Haron, A T (2021) Redefining the territory and competency of architectural practitioners within a BIM-based environment: A systematic review. Architectural Engineering and Design Management, 17(5-6), pp. 376-410. ISSN 1745-2007

Shahtaheri, M; Nasir, H and Haas, C T (2015) Setting baseline rates for on-site work categories in the construction industry. Journal of Construction Engineering and Management, 141(5): 04014097, ISSN 0733-9364

Shaker, R A; Elbeltagi, E; Motawa, I; Elmasoudi, I and Elnabwy, M T (2024) Social network analysis for identifying the significant drivers of off-site construction adoption in Egypt. Built Environment Project and Asset Management, 14(4), pp. 607-625. ISSN 2044-124X

Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.

Shalwani, A and Lines, B (2022) Using issue logs to improve construction project performance. Engineering, Construction and Architectural Management, 29(2), pp. 896-915. ISSN 0969-9988

Shalwani, A and Lines, B C (2021) An empirical analysis of the causes of cost and schedule growth for small healthcare and educational construction projects. International Journal of Construction Education and Research, 17(3), pp. 277-296. ISSN 1557-8771

Shalwani, A and Lines, B C (2021) An empirical analysis of issue management in small building construction projects. International Journal of Construction Education and Research, 17(4), pp. 352-372. ISSN 1557-8771

Shammas-Toma, M; Seymour, D E and Clark, L (1996) The effectiveness of formal quality management systems in achieving the required cover in reinforced concrete. Construction Management and Economics, 14(4), pp. 353-364. ISSN 01446193

Shamp, P (2017) Scheduling strategies for construction project managers toward on time delivery. PhD thesis, Walden University, USA.

Shams, D S and Alkhalifa, F (2025) Sustainability assessment of new building designs: A review for a region and occupancy-specific accessible tool. Architectural Engineering and Design Management, 21(2), pp. 191-210. ISSN 1745-2007

Shane, J; del Puerto, C L; Strong, K; Mauro, K and Wiley-Jones, R (2012) Retaining women students in a construction engineering undergraduate program by balancing integration and identity in student communities. International Journal of Construction Education and Research, 8(3), pp. 171-185. ISSN 1557-8771

Shane, J S (2006) A fundamental study of scope definition in early highway project development. PhD thesis, University of Colorado at Boulder, USA.

Shang, H; Anumba, C J; Bouchlaghem, D M; Miles, J C; Cen, M and Taylor, M (2005) An intelligent risk assessment system for distributed construction teams. Engineering, Construction and Architectural Management, 12(4), pp. 391-409. ISSN 0969-9988

Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms. PhD thesis, University of Washington, USA.

Shanmugapriya, S (2016) Structural equation modelling to investigate the factors influencing quality safety and productivity in construction projects. PhD thesis, Anna University, Chennai, India.

Sharafi, A; Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(2), pp. 87-103. ISSN 01446193

Sharafi, A; Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of financial conflicts in the operation phase of public-private partnership contracts. Journal of Construction Engineering and Management, 147(6): 78622011, ISSN 0733-9364

Sharif, A A (2025) A framework for social sustainability on the building level: A contextual approach. Construction Innovation, 25(3), pp. 710-731. ISSN 1471-4175

Sharif, M M; Chuo, S and Haas, C T (2022) Rapid 3D quality control in prefabrication using a 3D digital-templates framework. Journal of Construction Engineering and Management, 148(11): 04022117, ISSN 0733-9364

Sharifi, S; Saman, W; Alemu, A and Boland, J (2021) A proposed long-term thermal comfort scale. Building Research & Information, 49(6), pp. 661-678. ISSN 0961-3218

Sharma, N and Laishram, B (2025) Understanding the relevance and impact of the cost of quality in the construction industry: A systematic literature review using prisma. Construction Innovation, 25(6), pp. 1707-1726. ISSN 1471-4175

Sharma, M (2014) Architectural design quality in local authority private finance initiative sheltered housing projects: the development of an evaluation tool. PhD thesis, Northumbria University, UK.

Sharma, N; Sood, R and Laishram, B (2025) A hybrid PLS-SEM-ANN approach to COQ optimization. Construction Management and Economics, 43(11), pp. 938-960. ISSN 0144-6193

Sharmin, T and Khalid, R (2022) Post occupancy and participatory design evaluation of a marginalized low-income settlement in ahmedabad, India. Building Research & Information, 50(5), pp. 574-594. ISSN 0961-3218

Sharp, M and Jones, K (2012) Perceived inefficiency in social housing maintenance. Construction Innovation, 12(4), pp. 414-428. ISSN 1471-4175

Shaw, N (2010) Improving innovation management in construction. EngD thesis, Loughborough University, UK.

Shayboun, M; Kifokeris, D and Koch, C (2019) Construction planning with machine learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Sheamar, S; Wedawatta, G; Tennakoon, M; Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: An exploratory study from a contractors' perspective. Journal of Financial Management of Property and Construction, 29(2), pp. 211-228. ISSN 1366-4387

Shebob, A; Dawood, N; Shah, R K and Xu, Q (2012) Comparative study of delay factors in Libyan and the UK construction industry. Engineering, Construction and Architectural Management, 19(6), pp. 688-712. ISSN 0969-9988

Shehab, T; Blampied, N; Nasr, E and Sindhu, L (2024) Ann-based estimation model for the preconstruction cost of pavement rehabilitation projects. International Journal of Construction Management, 24(8), pp. 894-901. ISSN 1562-3599

Shehadeh, A and Alshboul, O (2025) Game theory integration in construction management: A comprehensive approach to cost, risk, and coordination under uncertainty. Journal of Construction Engineering and Management, 151(5): 04025039, ISSN 0733-9364

Sheikhkhoshkar, M; Bril El Haouzi, H; Aubry, A and Hamzeh, F (2024) An advanced exploration of functionalities as the underlying principles of construction control metrics. Smart and Sustainable Built Environment, 13(3), pp. 644-676. ISSN 2046-6099

Shelbourn, M; Bouchlaghem, N M; Anumba, C and Carrillo, P (2007) Planning and implementation of effective collaboration in construction projects. Construction Innovation, 7(4), pp. 357-377. ISSN 1471-4175

Shell, J F (2006) Decision-making strategies used by California school districts' chief business officials in the selection of construction management services as a project delivery system for construction projects over five million dollars. EdD thesis, University of La Verne, USA.

Shen, Q; Li, H; Chung, J and Hui, P Y (2004) A framework for identification and representation of client requirements in the briefing process. Construction Management and Economics, 22(2), pp. 213-221. ISSN 01446193

Shen, W; Tang, W; Wang, S; Duffield, C F; Hui, F K P and You, R (2017) Enhancing trust-based interface management in international engineering-procurement-construction projects. Journal of Construction Engineering and Management, 143(9): 04017061, ISSN 0733-9364

Shen, Y; Koh, T Y; Rowlinson, S and Bridge, A J (2015) Empirical investigation of factors contributing to the psychological safety climate on construction sites. Journal of Construction Engineering and Management, 141(11): 04015038, ISSN 0733-9364

Shepherd, S and Woskie, S R (2010) Case study to identify barriers and incentives to implementing an engineering control for concrete grinding dust. Journal of Construction Engineering and Management, 136(11), pp. 1238-1248. ISSN 0733-9364

Sherif, E and Kaka, A (2003) Factors influencing the selection of payment systems in construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Sherif, M A (2002) A framework for improving pre-project planning. PhD thesis, Loughborough University, UK.

Sherif, M A and Price, A D F (1999) A framework for pre-project planning. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Sheriff, A; Bouchlaghem, D; El-Hamalawi, A and Yeomans, S (2013) Seven lessons for effective information management. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 205-211. ISSN 17514312

Sherratt, F and Sherratt, S (2018) PPP problems: Challenging academic compliance with economic opportunism and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Sherratt, F; Sherratt, S and Ivory, C (2020) Challenging complacency in construction management research: The case of PPPs. Construction Management and Economics, 38(12), pp. 1086-1100. ISSN 01446193

Sheth, A and Sarkar, D (2020) Socio-economic feasibility analysis for sustainable mass rapid transit project in Western India. Journal of Construction in Developing Countries, 25(2), pp. 129-151. ISSN 1823-6499

Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.

Shi, X.; Ke, Y.; Wu, X.; Gong, X. and Zhang, J. (2026) How performance-based are China's public-private partnership road projects? A KPI framework and scoring method. Built Environment Project and Asset Management, 14, pp. 1-21. ISSN 2044-124X

Shi, Q; Zuo, J and Zillante, G (2012) Exploring the management of sustainable construction at the programme level: A Chinese case study. Construction Management and Economics, 30(6), pp. 425-440. ISSN 1466433X

Shin, D H (2007) Strategic development of AR systems for industrial construction. PhD thesis, Purdue University, USA.

Shipton, C (2013) Making changes: an ethnography of client changes on a construction project. PhD thesis, University of Reading, UK.

Shipton C, H W P (2013) Making changes in practice: An ethnographic study of a hospital project. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Shirani, F; O’sullivan, K; Henwood, K; Hale, R and Pidgeon, N (2022) Living in an active home: Household dynamics and unintended consequences. Buildings & Cities, 3(1), pp. 589-604. ISSN 2632-6655

Shirazi, A and Hampson, K (1998) Project manager competencies in a knowledge-based society. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Shiue, I (2016) Future urban design strategies for health and wellbeing: Proposal of DIDID action plan and design mapping. Journal of Engineering, Design and Technology, 14(1), pp. 104-114.

Shohet, I M (2003) Building evaluation methodology for setting maintenance priorities in hospital buildings. Construction Management and Economics, 21(7), pp. 681-692. ISSN 01446193

Shohet, I M (2006) Key performance indicators for strategic healthcare facilities maintenance. Journal of Construction Engineering and Management, 132(4), pp. 345-352. ISSN 0733-9364

Shohet, I M; Lavy-Leibovich, S and Bar-On, D (2003) Integrated maintenance monitoring of hospital buildings. Construction Management and Economics, 21(2), pp. 219-228. ISSN 01446193

Shohet, I M; Wei, H H; Skibniewski, M J; Tak, B and Revivi, M (2019) Integrated communication, control, and command of construction safety and quality. Journal of Construction Engineering and Management, 145(9): 04019051, ISSN 0733-9364

Shoniwa, Kuda John (2024) The use of integrated project delivery (IPD) to reduce construction claims in South African mining capital projects. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Short, C A; Cook, M and Lomas, K J (2009) Delivery and performance of a low-energy ventilation and cooling strategy. Building Research & Information, 37(1), pp. 1-30. ISSN 0961-3218

Shrahily, R; Medjdoub, B; Klalib, H; Chalal, M and Alwetaishi, M (2022) Managing construction site communication using the responsibility assignment matrix (RAM) system. International Journal of Construction Management, 22(15), pp. 2966-2986. ISSN 1562-3599

Shrestha, Asheem (2015) Risk allocation in public private partnerships: A principal agent approach. PhD thesis, University of Melbourne, Australia.

Shrestha, B (2024) Assessment of success factors and comparative analysis of public private partnership (P3) project performances against design-build and design-bid-build project delivery. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364

Shrestha, P P (2007) Performance benchmarking of large highway projects. PhD thesis, University of Texas at Austin, USA.

Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: Executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(7), pp. 2665-2688. ISSN 0969-9988

Shrestha, P P and Fernane, J D (2017) Performance of design-build and design-bid-build projects for public universities. Journal of Construction Engineering and Management, 143(3): 04016101, ISSN 0733-9364

Shrestha, P P; O'Connor, J T and Gibson Jr, G E (2012) Performance comparison of large design-build and design-bid-build highway projects. Journal of Construction Engineering and Management, 138(1), pp. 1-13. ISSN 0733-9364

Shrestha, P P; Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(6), pp. 1087-1104. ISSN 0969-9988

Shrestha, S; Shan, Y and Goodrum, P M (2024) Identification of best practices in project bundling for state dots using semistructured interviews. Journal of Construction Engineering and Management, 150(7): 04024056, ISSN 0733-9364

Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.

Shuaib, Salem Mohammed S (2016) Project management performance in Saudi Arabia: An exploratory study into the constructs that most influence project success. PhD thesis, University of Adelaide, Australia.

Shukor, A S A; Mohammad, M F; Mahbub, R and Ismail, F (2011) Supply chain integration challenges in project procurement in Malaysia: The perspective of IBS manufacturers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Shurrab, J and Hussain, M (2018) An empirical study of the impact of lean on the performance of the construction industry in UAE. Journal of Engineering, Design and Technology, 16(5), pp. 694-710. ISSN 1726-0531

Shwarka, M and Anigbogu, N A (2012) Impact of the public procurement reform on public building project delivery in Nigeria. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Siddiqi, K M (1997) Framework for analyzing construction alternatives with respect to environmental laws. PhD thesis, Georgia Institute of Technology, USA.

Siddiquei, A N; Ahmad, S; Badar, K and Asmi, F (2024) How and when creativity thrives in construction projects: A study of leader's humor. Engineering, Construction and Architectural Management, 31(8), pp. 3377-3397. ISSN 0969-9988

Siddiquei, Ahmad (2019) An extended model of temporal leadership, team processes, and project team performance. PhD thesis, Bond University, Australia.

Siddiqui, A A (2019) An investigation into data sharing between building information modelling and fire safety engineering, with potential applications to smart buildings. PhD thesis, University of Greenwich, UK.

Sidney, E E (2019) Evaluating the adoption of project management tools and techniques in private construction companies in Nigeria. PhD thesis, University of Bedfordshire, UK.

Sidwell, A C (1982) A critical study of project team organisational forms within the building process. PhD thesis, Aston University, UK.

Sidwell, A C (1990) Project management: Dynamics and performance. Construction Management and Economics, 8(2), pp. 159-178. ISSN 01446193

Sidwell, T and Kennedy, R (2004) Re-valuing construction through project delivery. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sierra, L A; Pellicer, E and Yepes, V (2016) Social sustainability in the lifecycle of Chilean public infrastructure. Journal of Construction Engineering and Management, 142(5): 05015020, ISSN 0733-9364

Siew, R Y J (2015) Health and safety communication strategy in a Malaysian construction company: A case study. International Journal of Construction Management, 15(4), pp. 310-320. ISSN 1562-3599

Siew, Yung (2014) Evaluating and enhancing the impact of sustainability reporting tools (SRTs). PhD thesis, University of New South Wales, Australia.

Sigonda, G G G (2000) The impact of infrastructural projects on the environment in Tanzania: The case of mindu dam. PhD thesis, University of Manchester, UK.

Silva, A S; de Melo, R R S; de Melo, R S S and Costa, D B (2026) Method for quality inspection during the execution of facades based on uas images and machine learning algorithms. International Journal of Construction Management, 26(2), pp. 277-294. ISSN 1562-3599

Silva, P M; Domingo, N and Ameer Ali, N A N (2024) Causes of disputes in the construction industry: a systematic literature review. Journal of Financial Management of Property and Construction, 29(2), pp. 193-210. ISSN 1366-4387

Silveira, B F and Costa, D B (2024) Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System. Construction Innovation, 24(4), pp. 1005-1025. ISSN 1471-4175

Silver, M L (1981) Craft production: Work and alienation in the construction industry. PhD thesis, Columbia University, USA.

Simister, S J (1994) An investigation into the influences on construction professionals' working practices. PhD thesis, University of Reading, UK.

Simkoko, E E (1989) Analysis of factors impacting technology transfer in construction projects: Case studies from developing countries. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Simon, M (2010) The commitment to corporate social responsibility of construction companies in the United Kingdom and Germany. PhD thesis, University of Dundee, UK.

Simpson, E; Gilmour, D; Blackwood, D; Falconer, R and Isaacs, J (2015) Major project team learning: Examining building information modelling. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Simpson, K B and Sam, A (2020) Strategies for health and safety management in Ghana. Journal of Engineering, Design and Technology, 18(2), pp. 431-450. ISSN 1726-0531

Simu, K (2009) The construction site manager's impact on risk management performance. PhD thesis, Luleå University of Technology, Sweden.

Simu, K and Lidelöw, H (2019) Middle managers' perceptions of operations strategies at construction contractors. Construction Management and Economics, 37(6), pp. 351-366. ISSN 01446193

Simushi, S and Wium, J (2020) Time and cost overruns on large projects: Understanding the root cause. Journal of Construction in Developing Countries, 25(1), pp. 129-146. ISSN 1823-6499

Sindhu, J; Choi, K; Lavy, S; Rybkowski, Z K; Bigelow, B F and Li, W (2018) Effects of front-end planning under fast-tracked project delivery systems for industrial projects. International Journal of Construction Education and Research, 14(3), pp. 163-178. ISSN 1557-8771

Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.

Sing, M C P; Edwards, D J; Leung, A W T; Liu, H and Roberts, C J (2022) A theoretical framework for classifying project complexity at the preconstruction stage using cluster analysis techniques. Engineering, Construction and Architectural Management, 29(9), pp. 3754-3774. ISSN 0969-9988

Singh, A (2002) Lean engineering for mass housing: Design, manufacture and site erection. Journal of Construction Research, 3(1), pp. 97-122. ISSN 1609-9451

Singh, A; Adachi, S and Inouye, M (2011) Quality control analysis of downtime and time to repair for water supply pipes. Built Environment Project and Asset Management, 1(1), pp. 75-90. ISSN 2044-124X

Singh, J and Anumba, C J (2024) Building commissioning process and documentation: A literature review and directions for future research. International Journal of Construction Management, 24(1), pp. 75-85. ISSN 1562-3599

Singh, S (2021) Stakeholder management within BIM implemented projects in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Singh, S; Chinyio, E and Suresh, S (2018) The implementation of stakeholder management and building information modelling (BIM) in UK construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.

Singhaputtangkul, N and Zhao, X (2016) Applying a fuzzy consensus scheme to enhance the group decision making of a building envelope design team. Journal of Construction Engineering and Management, 142(8): 4016025, ISSN 0733-9364

Singla, H. K. and Phadtare, M. (2026) Measuring construction contractor satisfaction from the lens of client performance: Empirical investigation in India. Journal of Construction Engineering and Management, 152(9): 04026133, ISSN 0733-9364

Singla, H K and Chammanam, S S (2024) Development of a financial performance measurement model for real estate business: An exploratory study in India. Journal of Financial Management of Property and Construction, 29(2), pp. 295-313. ISSN 1366-4387

Siva, J and Gajendran, T (2023) The hidden barriers to social value delivery in megaprojects: Investigating the decision-making environment. Built Environment Project and Asset Management, 13(4), pp. 610-628. ISSN 2044-124X

Skibniewski, M J and Ghosh, S (2009) Determination of key performance indicators with enterprise resource planning systems in engineering construction firms. Journal of Construction Engineering and Management, 135(10), pp. 965-978. ISSN 0733-9364

Skinnarland, S (2013) Use of progression planning tools in developing collaborative main contractor-subcontractor relationships in Norway. PhD thesis, Heriot-Watt University, UK.

Skinner, D W H (1974) An investigation of the contractor's use of bills of quantities. PhD thesis, Aston University, UK.

Skinner, D W H (1979) An analysis of the utility of bills of quantities in the process of building contracting. PhD thesis, Aston University, UK.

Skitmore, M; Xiong, B; Xia, B; Masrom, A and Newton, S (2020) Relationship between contractor satisfaction and project management performance. Construction Economics and Building, 20(4), pp. 1-24. ISSN 2204-9029

Slattery, K T and Slattery, D K (2013) Modeling earth surfaces for highway earthwork computation using terrestrial laser scanning. International Journal of Construction Education and Research, 9(2), pp. 132-146. ISSN 1557-8771

Slaughter, E S (1998) Models of construction innovation. Journal of Construction Engineering and Management, 124(3), pp. 226-231. ISSN 0733-9364

Sloan Wood, O; Lupenza, E; Agnello, D M; Knudsen, J B; Msellem, M; Schiøler, K L and Saleh, F (2025) Co-creating interventions to prevent mosquito-borne disease transmission in hospitals. Buildings & Cities, 6(1), pp. 819-840. ISSN 2632-6655

Small, E P; Bakry, I and Ayyash, L (2021) Evaluating the effect of TQM on mep construction productivity and project delivery in Dubai. International Journal of Construction Management, 21(10), pp. 1061-1075. ISSN 1562-3599

Small-Warner, K (2022) Adopting sustainable business models in small island developing states (SIDS): buildings and construction sector. PhD thesis, De Montfort University, UK.

Smith, C R (2001) Procuring the urban house in paradise. PhD thesis, Liverpool John Moores University, UK.

Smith, J; Edwards, D J; Martek, I; Chileshe, N; Hayhow, S and Roberts, C J (2023) The antecedents of construction project change: An analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3), pp. 655-689. ISSN 1726-0531

Smith, J; Georgiou, J; O’Keeffe, N and Love, P (2003) Design management in a design-construct organization. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Smith, R E; Griffin, G; Rice, T and Hagehofer-Daniell, B (2018) Mass timber: Evaluating construction performance. Architectural Engineering and Design Management, 14(1-2), pp. 127-138. ISSN 1745-2007

Smith, V R R (2008) Impact to alternative contracting methods using multivariate analysis in the regulatory environment. PhD thesis, Georgia Institute of Technology, USA.

Smitha, J S and Thomas, A (2021) Integrated model and index for circular economy in the built-environment in the Indian context. Construction Economics and Building, 21(3), pp. 198-220. ISSN 2204-9029

Smithers, G L (2000) The effect of the site environment on motivation and demotivation of construction professionals. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Smits, W; van Buiten, M and Hartmann, T (2017) Yield-to-BIM: Impacts of BIM maturity on project performance. Building Research & Information, 45(3), pp. 336-346. ISSN 0961-3218

Snippert, T; Witteveen, W; Boes, H and Voordijk, H (2015) Barriers to realizing a stewardship relation between client and vendor: The best value approach. Construction Management and Economics, 33(7), pp. 569-586. ISSN 01446193

Snyder, J R; Stephenson, L C; Mackie, J E and Smith, S D (2016) Agent-based modelling and the byzantine: Understanding the construction of antiquity's largest infrastructure project. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Sodangi, M and Salman, A (2023) AHP-DEMATEL modelling of consultant related delay factors affecting sustainable housing construction in Saudi Arabia. International Journal of Construction Management, 23(16), pp. 2859-2868. ISSN 1562-3599

Soemardi, B W (1993) Fuzzy neural network models for design/construction processes. PhD thesis, University of Kentucky, USA.

Soetanto, R (2002) Modelling satisfaction for main participants of the construction project coalition: a study of mutual performance assessment. PhD thesis, University of Wolverhampton, UK.

Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Towards an explicit design decision process: The case of the structural frame. Construction Management and Economics, 24(6), pp. 603-614. ISSN 1466433X

Soetanto, R; Poh, P; Austin, S; Hao, J and Katsanis, C (2012) Communication modes and performance of virtual design teams in an undergraduate building project. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Soetanto, R and Proverbs, D G (2001) Modelling client satisfaction levels: A comparison of multiple regression and artificial neural network techniques. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Soetanto, R and Proverbs, D G (2002) Modelling client satisfaction levels: The impact of contractor performance. Construction Economics and Building, 2(1), pp. 13-27. ISSN 2204-9029

Soetanto, R and Proverbs, D G (2002) Modelling the satisfaction of contractors: The impact of client performance. Engineering, Construction and Architectural Management, 9(5-6), pp. 453-465. ISSN 0969-9988

Soetanto, R and Proverbs, D G (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research, 5(2), pp. 233-253. ISSN 1609-9451

Soetanto, R; Proverbs, D G and Cooper, P (1999) A conceptual model of performance and satisfaction for main participants of construction project coalitions. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Sohal, K; Renukappa, S; Suresh, S; Georgakis, P and Stride, N (2025) The uptake of digital twins in delivering infrastructure sector projects. Smart and Sustainable Built Environment, 14(3), pp. 794-809. ISSN 2046-6099

Sohn, T (2009) Determining durations for right-of-way acquisition and utility adjustment on highway projects. PhD thesis, University of Texas at Austin, USA.

Sohoni, P; Ghaffar, A and Jha, K N (2017) Cost optimisation for high-rise buildings considering number of levels of shores and reshores. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Solanki, A; Sarkar, D and Kapdi, P (2024) Evaluation of key performance indicators of internet of things and cloud computing for infrastructure projects in Gujarat, India through consistent fuzzy preference relations approach. International Journal of Construction Management, 24(7), pp. 707-721. ISSN 1562-3599

Soliman, E; Al-Tabtabai, H; Almusalam, A and Hussein, M (2023) Impact of COVID-19 on labor's motivational factors and construction productivity. International Journal of Construction Management, 23(15), pp. 2699-2708. ISSN 1562-3599

Solis, F; Sinfield, J V and Abraham, D M (2013) Hybrid approach to the study of inter-organization high performance teams. Journal of Construction Engineering and Management, 139(4), pp. 379-392. ISSN 0733-9364

Sommerville, J and Campbell, C (2000) Project management: The role paradigm shift. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Sommerville, J; Craig, N and Callaghan, N (2012) House building service quality and buyer expectations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Son, J (2011) An integrated model of evolution of project teams in large-scale construction projects. PhD thesis, University of Washington, USA.

Son, J and Rojas, E M (2011) Evolution of collaboration in temporary project teams: An agent-based modeling and simulation approach. Journal of Construction Engineering and Management, 137(8), pp. 619-628. ISSN 0733-9364

Sonet, U N and Klufallah, M (2024) Evaluation of indicators for participatory and collaborative design process for public parks in Malaysia: Analytical hierarchy process. Journal of Construction in Developing Countries, 29(2), pp. 1-18. ISSN 1823-6499

Song, J; Fagerlund, W R; Haas, C T; Tatum, C B and Vanegas, J A (2005) Considering prework on industrial projects. Journal of Construction Engineering and Management, 131(6), pp. 723-733. ISSN 0733-9364

Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.

Song, Y and Chua, D K H (2006) Modeling of functional construction requirements for constructability analysis. Journal of Construction Engineering and Management, 132(12), pp. 1314-1326. ISSN 0733-9364

Songer, A D; Diekmann, J E; Rasheed, K A and Hays, B (2001) Construction scheduling using 3-D CAD and walk-thru. Construction Innovation, 1(3), pp. 191-207. ISSN 1471-4175

Songer, A D and Walker, B (2004) General contractor emotional intelligence in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Sonkor, Muammer Semih (2026) A cybersecurity decision-support framework for technology integration in the built environment. PhD thesis, New York University Tandon School of Engineering, USA.

Sonkor, M S and García De Soto, B (2021) Operational technology on construction sites: A review from the cybersecurity perspective. Journal of Construction Engineering and Management, 147(12): 04021172, ISSN 0733-9364

Soon, C D (2009) Managing risk and uncertainty in transportation megaprojects. PhD thesis, University of Hawai'i at Manoa, USA.

Sospeter, N G (2025) A categorization of factors affecting quality of design documentation in Tanzanian construction projects. Journal of Engineering, Design and Technology, 23(1), pp. 228-248. ISSN 1726-0531

Sospeter, N G; Chang'ah, A and Rwelamila, P D (2024) Re-imagining the factors influencing the choice of project management tools and techniques in Tanzanian infrastructure projects: Elicitation of practitioners' perspectives. Journal of Construction Business and Management, 7(1), pp. 34-45. ISSN 2521-0165

Sousa, Rita dos Santos (2019) Production planning and control methodology for soil bioengineering works. PhD thesis, Universidade Federal de Santa Maria, Brazil.

South, A J (2019) Stakeholder network dynamics and the governance of public-private partnerships. PhD thesis, Stanford University, USA.

Souza, Douglas Lopes de (2024) Natural language processing of technical standard for the construction sector the study of the nbr 15.575. PhD thesis, Universidade Estadual de Campinas, Brazil.

Souza, Roberto de (1997) Methodology for development and implementation of quality management systems in small and medium size building companies. PhD thesis, Universidade de São Paulo, Brazil.

Sowder, Anne Marie (2023) Framework for recovery: The 1935 hurricane houses of islamorada as a case of successful post-disaster rebuilding. PhD thesis, University of Florida, USA.

Sparkling, A E (2018) Collaborative project delivery practices, goal alignment, and performance in architecture, engineering, and construction project teams. PhD thesis, Michigan State University, USA.

Spencer, Carolyn (2004) Cognitive schemata and project manager regulation of unplanned change: Categorical analysis of structured interview reports. PhD thesis, Griffith University, Australia.

Sporrong, J (2011) Criteria in consultant selection: Public procurement of architectural and engineering services. Construction Economics and Building, 11(4), pp. 59-76. ISSN 2204-9029

Spottiswoode, B H and MacKellar, D C R (2013) The role and effect of technical review panels. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 103-108. ISSN 17514312

Sprau Coulter, T L (2014) Improving energy audit process and report outcomes through planning initiatives. PhD thesis, Pennsylvania State University, USA.

Srijaroen, C; Hoy, M; Horpibulsuk, S; Rachan, R and Arulrajah, A (2021) Soil-cement screw pile: Alternative pile for low- and medium-rise buildings in soft bangkok clay. Journal of Construction Engineering and Management, 147(2): 1988, ISSN 0733-9364

Srivastava, A; Srivastava, D K and Misra, A K (2019) Spatial variability modeling and reliability analysis of flexible pavement through mechanistic–empirical model. Journal of Engineering, Design and Technology, 17(6), pp. 1129-1145. ISSN 1726-0531

Ssengooba, F P (2010) Performance-based contracting: a case study of non-profit hospitals in Uganda. PhD thesis, University of London, UK.

Ssimbwa, Edward (2023) Streamlining the management of building construction regulatory framework in Sub-Sahara africa's public service - a case for Uganda. DM thesis, Colorado Technical University, USA.

Staal, A A G (2019) Managing innovative suppliers: Exploring company, procurement, and performance variables in New Zealand construction supply chains. PhD thesis, Auckland University of Technology, New Zealand.

Stamatiadis, N; Goodrum, P; Shocklee, E and Wang, C (2014) Quantitative analysis of state transportation agency's experience with constructability reviews. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364

Staples, C and Spillane, J (2019) Exploring the potential improvement of quality control in the construction industry with the use of digital technology. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Starzyk, G F (2014) Alliance contracting: Enforceability of the consensusdocs 300 mutual waiver of liability in us courts. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Staub-French, S; Pilon, A; Poirier, E; Fallahi, A; Kasbar, M; Calderon, F; Teshnizi, Z and Froese, T (2022) Construction process innovation on brock commons tallwood house. Construction Innovation, 22(1), pp. 1-22. ISSN 1471-4175

Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.

Staykova, G and Underwood, J (2017) Assessing collaborative performance on construction projects through knowledge exchange: A UK rail strategic alliance case study. Engineering, Construction and Architectural Management, 24(6), pp. 968-987. ISSN 0969-9988

Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications. PhD thesis, KTH Royal Institute of Technology, Sweden.

Stenbeck, T (2008) Quantifying effects of incentives in a rail maintenance performance-based contract. Journal of Construction Engineering and Management, 134(4), pp. 265-272. ISSN 0733-9364

Stephenson, P; Morrey, I; Vacher, P and Ahmed, Z (2002) Acquisition and structuring of knowledge for defect prediction in brickwork mortar. Engineering, Construction and Architectural Management, 9(5-6), pp. 396-408. ISSN 0969-9988

Stewart, R A (2003) Lifecycle management of information technology (IT) projects in construction. PhD thesis, Griffith University, Australia.

Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: A case study. Construction Management and Economics, 24(4), pp. 339-348. ISSN 01446193

Stiles, S (2019) Investigation of safety leadership within infrastructure engineering construction projects. PhD thesis, University of Nottingham, UK.

Stino, R M (1999) Effect of spatial variables on bricklaying productivity and ergonomics. PhD thesis, University of Michigan, USA.

Stojanovic, V; Trapp, M; Richter, R; Hagedorn, B and Döllner, J (2018) Towards the generation of digital twins for facility management based on 3D point clouds. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Stouffs, R (2001) Visualizing information structures and its impact on project teams: An information architecture for the virtual AEC company. Building Research & Information, 29(3), pp. 218-232. ISSN 0961-3218

Stoy, C and Kytzia, S (2006) Benchmarking electricity consumption. Construction Management and Economics, 24(10), pp. 1083-1089. ISSN 1466433X

Strahorn, S; Gajendran, T and Brewer, G (2014) Experiences of trust in construction project management: The influence of procurement mechanisms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Strahorn, S; Gajendran, T and Brewer, G (2015) The influence of trust in traditional contracting: Investigating the "lived experience" of stakeholders. Construction Economics and Building, 15(2), pp. 81-101. ISSN 2204-9029

Straub, A D (2010) Competences of maintenance service suppliers servicing end-customers. Construction Management and Economics, 28(11), pp. 1187-1195. ISSN 1466433X

Stride, M; Hon, C K H; Liu, R and Xia, B (2020) The use of building information modelling by quantity surveyors in facilities management roles. Engineering, Construction and Architectural Management, 27(8), pp. 1795-1812. ISSN 0969-9988

Sturgill Jr., Roy E (2018) Risk management and practice alignment for utility coordination on transportation projects. PhD thesis, University of Kentucky, USA.

Su, Y.; Gao, X. and Zheng, Z. (2026) Unsupervised deep learning and Bayesian network-based identification of key risk factors in construction quality defects. Journal of Construction Engineering and Management, 152(7): 04026083, ISSN 0733-9364

Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.

Su, X; Li, S; Yuan, C; Cai, H and Kamat, V R (2014) Enhanced boundary condition-based approach for construction location sensing using RFID and RTK GPS. Journal of Construction Engineering and Management, 140(10): 04014048, ISSN 0733-9364

Subbiah, A (2012) An investigation of the factors influencing the success of construction planning for the 2012 olympic stadium: An ethnographic study. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Subramaniyan, A S (2020) Engineering procurement and construction companies in India: Which factors drive their willingness to pay. PhD thesis, Chitkara University, Punjab, India.

Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP). PhD thesis, Columbia University, USA.

Suermann, P C (2009) Evaluating the impact of building information modeling (BIM) on construction. PhD thesis, University of Florida, USA.

Sufianto, Heru (2013) A fire safety improvement framework for residential buildings: A socio-ecological behaviour modification approach. PhD thesis, University of New South Wales, Australia.

Sulaiman, K (2008) A study of building procurement process as a potential tool to enhance safety practice in the construction industry. PhD thesis, University of Salford, UK.

Sullivan, J; Asmar, M E; Chalhoub, J and Obeid, H (2017) Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6): 04017009, ISSN 0733-9364

Sullivan, K T; Kashiwagi, D; Savicky, J; Kashiwagi, M; Egbu, C and Chang, C K (2006) Increasing performance by minimizing the passing of information. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sultan, Mohamed (2025) PPP contracts for healthcare facilities in Canada: Qualitative study to identify lessons learned. PhD thesis, Arizona State University, USA.

Sumanohar, Symon (2022) Statistical approach towards complexities resolution for design, building, and operation of data centers. DBA thesis, American Business Management and Technology College, Switzerland.

Sumner, M and Slattery, D (2010) The impact of leadership effectiveness and team processes on team performance in construction. International Journal of Construction Education and Research, 6(3), pp. 179-201. ISSN 1557-8771

Sumner, S and Farrell, P (2003) The influence of clients on health and safety standards in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Sun, Jing (2020) Green infrastructure design and evaluation model for resilient sponge city program transitional construction. PhD thesis, University of Nottingham, UK.

Sun, M; Fleming, A; Senaratne, S; Motawa, I and Yeoh, M L (2006) A change management toolkit for construction projects. Architectural Engineering and Design Management, 2(4), pp. 261-271. ISSN 1745-2007

Sun, M; Vidalakis, C and Oza, T (2009) A change management maturity model for construction projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Sun, M; Zhu, F and Sun, X (2020) Influencing factors of construction professionals' burnout in China: A sequential mixed-method approach. Engineering, Construction and Architectural Management, 27(10), pp. 3215-3233. ISSN 0969-9988

Sun, M; Liu, M; Guan, J; Zhu, F and Zhang, Z (2025) Influence of the fit between the receiving and giving of helping behavior on construction professionals' workplace well-being: Self-determination perspective. Journal of Construction Engineering and Management, 151(12): 04025192, ISSN 0733-9364

Sundararajan, S K (2004) Project performance-based optimal capital structure for privately financed infrastructure projects. PhD thesis, University of Maryland, College Park, USA.

Sundling, R; Blomsterberg, Å and Landin, A (2019) Enabling energy-efficient renovation: the case of vertical extension to buildings. Construction Innovation, 19(1), pp. 2-14. ISSN 1471-4175

Sundling, R; Olander, S; Wallentén, P; Burke, S; Bernardo, R and Blomsterberg, Å (2019) Lifecycle profit analysis of prefabricated multi-active façades. International Journal of Building Pathology and Adaptation, 37(5), pp. 565-578. ISSN 23984708

Surahyo, M and El-Diraby, T E (2009) Schema for interoperable representation of environmental and social costs in highway construction. Journal of Construction Engineering and Management, 135(4), pp. 254-266. ISSN 0733-9364

Suraji, A (2001) Development and validation of a theory of construction accident causation. PhD thesis, University of Manchester, UK.

Suraji, A and Duff, A R (2000) Construction management actions: A stimulant of construction accident causation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Suresh, M and Arun Ram Nathan, R B (2020) Readiness for lean procurement in construction projects. Construction Innovation, 20(4), pp. 587-608. ISSN 1471-4175

Suresh, S (2006) Knowledge capture in small and medium enterprises in the UK construction industry. PhD thesis, Glasgow Caledonian University, UK.

Suresh, S; Olayinka, R; Chinyio, E and Renukappa, S (2017) Impact of knowledge management on construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 27-43. ISSN 17514304

Suresh, S; Renukappa, S; Alghanmi, I; Mushatat, S and Olayinka, R (2017) Examining the satisfaction level of construction workers regarding safety management in the kingdom of Saudi Arabia. Journal of Construction in Developing Countries, 22(1), pp. 97-113. ISSN 1823-6499

Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(2), pp. 267-284. ISSN 0969-9988

Sutrisna, M and Potts, K (2002) Analysing typical factors for the early prediction of variations. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Swallow, M and Zulu, S (2024) Enhancing collaboration and engagement using virtual reality within site safety planning. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 223-231. ISSN 17514304

Swallow, M and Zulu, S L (2025) Investigating the implementation of immersive technologies within on-site construction safety processes. Journal of Engineering, Design and Technology, 23(1), pp. 323-343. ISSN 1726-0531

Swan, W; Cooper, R; McDermott, P and Wood, G (2001) A review of social network analysis for the IMI Trust in Construction Project. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Swan, W and Khalfan, M M A (2007) Mutual objective setting for partnering projects in the public sector. Engineering, Construction and Architectural Management, 14(2), pp. 119-130. ISSN 0969-9988

Swan, W; McDermott, P; Khalfan, M M A; Cooper, R; Rees, C and Wood, G (2005) The Development of Trust Inventory. Journal of Construction Procurement, 11(1),

Swarts, K M; Lehman, K and Lewis, G K (2016) The use of social customer relationship management by building contractors: Evidence from Tasmania. Construction Management and Economics, 34(4-5), pp. 302-316. ISSN 01446193

Swarup, L; Korkmaz, S and Riley, D (2011) Project delivery metrics for sustainable, high-performance buildings. Journal of Construction Engineering and Management, 137(12), pp. 1043-1051. ISSN 0733-9364

Sweis, R J; Al Sharef, R; Jandali, D; Obeidat, B Y and Andrawes, N (2018) The relationship between project team members' effectiveness and acknowledgment of talent: Team members' perspective. International Journal of Construction Education and Research, 14(2), pp. 141-60. ISSN 1557-8771

Syal, M G (1992) Construction process knowledge model to assist method selection in project planning. PhD thesis, Pennsylvania State University, USA.

Syal, M G; Grobler, F; Willenbrock, J H and Parfitt, M K (1992) Construction project planning process model for small-medium builders. Journal of Construction Engineering and Management, 118(4), pp. 651-666. ISSN 0733-9364

Sylvester, K E (1999) An analysis of the benefits of photovoltaic-coated glazing on owning and operating costs of high rise commercial buildings. PhD thesis, Texas A&M University, USA.

Sylvie, J R (2005) Developing best practices for industrial project life cycle security and a methodology for measuring implementation. PhD thesis, University of Texas at Austin, USA.

Symons, Anne Wood (2021) Integrated design, design management and the delivery of major hospitals. PhD thesis, University College London, UK.

Sze, E; Kumaraswamy, M; Fung, A; Palaneeswaran, E and Wong, S (2004) Partnering with the tenants- Hong Kong experience. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Tabarroki, S; Nazari, A and Banihashemi, S (2024) Risk stages and factors in architectural design- a structural equation modelling. Architectural Engineering and Design Management, 20(1), pp. 79-101. ISSN 1745-2007

Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Taheri, Ali (2024) The framework of an infrastructure performance model based on the concepts of civil integrated management (CIM). PhD thesis, Florida State University, USA.

Tai, S; Wang, Y and Anumba, C J (2009) A survey on communications in large-scale construction projects in China. Engineering, Construction and Architectural Management, 16(2), pp. 136-149. ISSN 0969-9988

Taiebat, M (2011) Tuning up BIM for safety analysis proposing modeling logics for application of BIM in DfS. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Taimu, M (2020) A contractor-driven stakeholder relationship management framework for botswana's construction industry. DBL thesis, University of South Africa, South Africa.

Takim, R (2005) A framework for successful construction project performance. PhD thesis, Glasgow Caledonian University, UK.

Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Takim, R; Akintoye, A and Kelly, J (2004) Analysis of measures of construction project success in Malaysia. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Talabi, B O (2016) Achieving safer behaviours of frontline construction workers: The role of supervisors. PhD thesis, Loughborough University, UK.

Tam, C M (1992) Discriminant analysis model for predicting contractor performance in Hong Kong. PhD thesis, Loughborough University, UK.

Tam, C M; Deng, Z M; Zeng, S X and Ho, C S (2000) Quest for continuous quality improvement for public housing construction in Hong Kong. Construction Management and Economics, 18(4), pp. 437-446. ISSN 01446193

Tam, C M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(2), pp. 120-136. ISSN 1471-4175

Tam, V W Y and Le, K N (2008) On using the Gaussian and hyperbolic distributions to improve quality in construction. Journal of Engineering, Design and Technology, 6(2), pp. 112-123. ISSN 1726-0531

Tam, V W Y; Le, K N and Le, H N (2008) Using Gaussian and hyperbolic distributions for quality improvement in construction: Case study approach. Journal of Construction Engineering and Management, 134(7), pp. 555-561. ISSN 0733-9364

Tambwe, O T; Aigbavboa, C O and Akinradewo, O (2025) Benefits of construction data risks management in the construction industry. Journal of Engineering, Design and Technology, 23(2), pp. 458-476. ISSN 1726-0531

Tan, S Y and Zainon, N (2023) Impact of COVID-19 pandemic on the quantity surveying practices in Malaysia. Engineering, Construction and Architectural Management, 30(8), pp. 3480-3508. ISSN 0969-9988

Tang, S L; Aoieong, R T and Ahmed, S M (2004) The use of process cost model (PCM) for measuring quality costs of construction projects: Model testing. Construction Management and Economics, 22(3), pp. 263-275. ISSN 01446193

Tang, W; Duffield, C F and Young, D M (2006) Partnering mechanism in construction: An empirical study on the Chinese construction industry. Journal of Construction Engineering and Management, 132(3), pp. 217-229. ISSN 0733-9364

Tang, W; Qiang, M; Duffield, C F; Young, D M and Lu, Y (2008) Incentives in the Chinese construction industry. Journal of Construction Engineering and Management, 134(7), pp. 457-467. ISSN 0733-9364

Tang, Y (2006) Evolutionary and customer-oriented building design process. PhD thesis, Loughborough University, UK.

Tang, Y; Liu, R and Sun, Q (2014) Two-stage scheduling model for resource leveling of linear projects. Journal of Construction Engineering and Management, 140(7): 04014022, ISSN 0733-9364

Tangkitsiri, W (2016) Modelling user satisfaction with transportation public-private partnership projects. PhD thesis, Heriot-Watt University, UK.

Tanko, B L; Zakka, W P and Heng, W N (2024) BIM in the Malaysian construction industry: A scientometric review and case study. Engineering, Construction and Architectural Management, 31(3), pp. 1165-1186. ISSN 0969-9988

Tao, X (2023) Distributed common data environment for secure BIM-based collaborative design using blockchain technology. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Tarawneh, S A (1999) Service quality and its relationship with client satisfaction and behavioural intentions in UK construction: The case of design and build contracting services. PhD thesis, University of Leeds, UK.

Tas, E; Yaman, H and Tanacan, L (2008) A building material evaluation and selection model for the Turkish construction sector. Engineering, Construction and Architectural Management, 15(2), pp. 149-163. ISSN 0969-9988

Tatum, C B (1983) Innovations in nuclear concrete construction. Journal of Construction Engineering and Management, 109(2), pp. 131-145. ISSN 0733-9364

Tatum, C B (1983) Issues in professional construction management. Journal of Construction Engineering and Management, 109(1), pp. 112-119. ISSN 0733-9364

Tatum, C B (2011) Core elements of construction engineering knowledge for project and career success. Journal of Construction Engineering and Management, 137, pp. 745-750. ISSN 0733-9364

Tatum, C B; Bauer, M F and Meade, A W (1989) Process of innovation for up/down construction at Rowes Wharf. Journal of Construction Engineering and Management, 115(2), pp. 179-195. ISSN 0733-9364

Tavakolan, M and Etemadinia, H (2017) Fuzzy weighted interpretive structural modeling: Improved method for identification of risk interactions in construction projects. Journal of Construction Engineering and Management, 143(11): 04017084, ISSN 0733-9364

Tawalare, A; Laishram, B and Thottathil, F (2020) Relational partnership in public construction organizations: Front-line employee perspective. Journal of Construction Engineering and Management, 146(1): 04019086, ISSN 0733-9364

Taylor, M S (2021) Strategic management accounting practices in medium sized UK construction companies: a mixed-methods approach. PhD thesis, Nottingham Trent University, UK.

Telem, D; Shapira, A; Goren, Y D and Schexnayder, C J (2006) Moving a reinforced-concrete building: Case study. Journal of Construction Engineering and Management, 132(2), pp. 115-124. ISSN 0733-9364

Tembo, C K (2018) Risk allocation on building projects in the Zambian construction industry. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Teng, Y; Li, X; Wu, P and Wang, X (2019) Using cooperative game theory to determine profit distribution in IPD projects. International Journal of Construction Management, 19(1), pp. 32-45. ISSN 1562-3599

Tengan, C and Aigbavboa, C (2021) Validating factors influencing monitoring and evaluation in the Ghanaian construction industry: A Delphi study approach. International Journal of Construction Management, 21(3), pp. 223-234. ISSN 1562-3599

Tengan, C; Aigbavboa, C O; Guribie, F and Annor-Asubonteng, J (2019) Analysis of the outcome features of effective monitoring and evaluation in construction project delivery. Journal of Engineering, Design and Technology, 17(6), pp. 1192-1201. ISSN 1726-0531

Tengberg, C S (2022) A design-build contractor risk assessment framework for new technical solutions in the construction industry. PhD thesis, Chalmers University of Technology, Sweden.

Tennakoon, T M M P; Chileshe, N; Rameezdeen, R; Ochoa, J J and Samaraweera, A (2026) Enhancing supply chain resilience in offsite construction through the procurement strategy: A systematic literature review. Construction Innovation, 26(1), pp. 63-82. ISSN 1471-4175

Tennant, S (2007) Site management teams and project performance in the UK construction industry. PhD thesis, University of Strathclyde, UK.

Tennant, S and Langford, D (2005) Construction management teams & project performance: A diagnostic toolkit. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Tennant, S and Langford, D (2006) Team performance measurement: Let's reward teamwork. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Tennant, S and Langford, D (2008) The construction project balanced scorecard. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Tennant, S; McCarney, M and Tong, M K L (2012) Re-engineering the construction supply chain: Transferring on-site activity off-site. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Teo, R A (2006) Continuous improvement to the construction industry: Enhancing quality through learning. PhD thesis, Heriot-Watt University, UK.

Teriö, O and Kähkönen, K (2011) Developing and implementing environmental management systems for small and medium-sized construction enterprises. Construction Management and Economics, 29(12), pp. 1183-1195. ISSN 1466433X

Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364

Teräväinen, V; Junnonen, J M and Ali-Löytty, S (2018) Organizational culture: Case of the Finnish construction industry. Construction Economics and Building, 18(1), pp. 48-69. ISSN 2204-9029

Tesfagaber, G (2004) Application of PSL to construction process information specification and exchange. PhD thesis, Loughborough University, UK.

Tetik, M; Peltokorpi, A; Seppänen, O; Leväniemi, M and Holmström, J (2021) Kitting logistics solution for improving on-site work performance in construction projects. Journal of Construction Engineering and Management, 147(1): 05020020, ISSN 0733-9364

Tetteh, M O; Chan, A P C; Darko, A; Özorhon, B and Adinyira, E (2024) Developing a multidimensional performance measurement framework for international construction joint ventures (icjvs): The perspective of Ghana-hosted icjvs' practitioners. Engineering, Construction and Architectural Management, 31(12), pp. 4754-4790. ISSN 0969-9988

Thakhtravachi, M (2017) Tacit knowledge integration within the traditional construction procurement system. PhD thesis, University of Salford, UK.

Thakur, N; Awasthi, Y K; Hooda, M and Siddiqui, A S (2019) Adaptive whale optimization for intelligent multi-constraints power quality improvement under deregulated environment. Journal of Engineering, Design and Technology, 17(3), pp. 490-514. ISSN 1726-0531

Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems. PhD thesis, Aston University, UK.

Thekinen, J D; Pandey, N; Mollaoglu, S; Duva, M; Frank, K and Zhao, D (2023) Detecting information bottlenecks in architecture engineering construction projects for integrative project management. Journal of Construction Engineering and Management, 149(12): 04023135, ISSN 0733-9364

Thomas, Douglas N (2015) The increase of timber use in residential construction in Australia: Towards a sustainable residential development model. PhD thesis, University of Technology Sydney, Australia.

Thomas, J; Giddings, B and Little, L (2006) An holistic evaluation of the workplace environment. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Thomas, L E (2010) Evaluating design strategies, performance and occupant satisfaction: A low carbon office refurbishment. Building Research & Information, 38(6), pp. 610-624. ISSN 0961-3218

Thomas, S R (1996) An assessment tool for improving project team communications. PhD thesis, University of Texas at Austin, USA.

Thomas, W K (2013) The impact of RFP phase project scope development on the successful outcome of construction projects using the design build project delivery method. PhD thesis, University of Alabama in Huntsville, USA.

Thompson, M J (2023) Environmental sustainability of small wastewater treatment systems and pathways for improvement. PhD thesis, University of Nebraska - Lincoln, USA.

Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Thomson, C and El-Haram, M (2014) Potential and implications of sustainability action plans: Lessons from the Greater Middlehaven Regeneration Project. Built Environment Project and Asset Management, 4(1), pp. 108-122. ISSN 2044-124X

Thomson, C P H (2016) From point cloud to building information model: capturing and processing survey data towards automation for high quality 3D models to aid a BIM process. PhD thesis, University College London, UK.

Thomson, C S and El-Haram, M (2011) Exploring the potential of sustainability action plans within construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Thomson, C S; El-Haram, M A and Emmanuel, R (2009) Mapping knowledge during sustainability assessment within a PPP school project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Thomson, C S; El-Haram, M A; Hardcastle, C and Horner, R M W (2008) Developing an urban sustainability assessment protocol reflecting the project lifecycle. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Thomson, C S and Munns, A K (2010) Managing the implementation of component innovation within construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Thomson, D S; Austin, S A; Root, D S; Thorpe, A and Hammond, J W (2006) A problem-solving approach to value-adding decision making in construction design. Engineering, Construction and Architectural Management, 13(1), pp. 43-61. ISSN 0969-9988

Thomson, D S; Carter, K and Grant, F (2017) Unpacking cohort social ties: The appropriateness of perceived social capital to graduate early career performance in construction project teams. International Journal of Construction Education and Research, 13(4), pp. 299-316. ISSN 1557-8771

Thomson, Esmeralda (2017) Adoptive governance in distributed agile development projects. PhD thesis, University of New South Wales, Australia.

Thoradeniya, D; Jayasinghe, C; Ariyaratne, I E and Basnayake, G B M A (2026) Construction quality framework for school buildings: Damage detection and rectification prioritization. International Journal of Construction Management, 26(4), pp. 660-678. ISSN 1562-3599

Thorpe, D (2003) Online remote construction management trials in Queensland department of main roads: A participant's perspective. Construction Innovation, 3(2), pp. 65-79. ISSN 1471-4175

Thorpe, T and Mead, S (2001) Project-specific web sites: Friend or foe? Journal of Construction Engineering and Management, 127(5), pp. 406-413. ISSN 0733-9364

Thunberg, M (2016) Developing a framework for supply chain planning in construction. PhD thesis, Linköping University, Sweden.

Thunberg, M and Fredriksson, A (2018) Bringing planning back into the picture: how can supply chain planning aid in dealing with supply chain-related problems in construction? Construction Management and Economics, 36(8), pp. 425-442. ISSN 01446193

Tian, D; Liu, H; Chen, S; Li, M and Liu, C (2022) Human error analysis for hydraulic engineering: Comprehensive system to reveal accident evolution process with text knowledge. Journal of Construction Engineering and Management, 148(9): 04022093, ISSN 0733-9364

Tian, L; Wright, A; Painter, B and Pazhoohesh, M (2023) Factors influencing BIM use in green building construction project management in the UK and China. Building Research & Information, 51(7), pp. 853-870. ISSN 0961-3218

Tian, Y (2022) Financing infrastructure through blockchain tokenization. PhD thesis, University of Florida, USA.

Tiew, S Y (2024) Factors affecting performance of graduate architects in contract implementation management: A case study on housing projects in Malaysia. Engineering, Construction and Architectural Management, 31(5), pp. 1789-1806. ISSN 0969-9988

Tiew, S Y; Hashim, H A and Zolkafli, U K B (2022) Performance barriers in relation with professional development of graduate architects in construction industry: A systematic literature review. Journal of Construction Business and Management, 5(2), pp. 29-43. ISSN 2521-0165

Tinarwo, B; Rahimian, F and Abi Ghanem, D (2025) Towards a trajectory for sustainable policies and market strategies governing building lifecycle energy performance. Smart and Sustainable Built Environment, 14(1), pp. 140-162. ISSN 2046-6099

Tiong, R L K (1996) CSFs in competitive tendering and negotiation model for BOT projects. Journal of Construction Engineering and Management, 122(3), pp. 205-211. ISSN 0733-9364

Tiwari, R (2015) A decision-support framework for design of non-residential net-zero energy buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Tjandra, K D; Irawan, F G; Nugraha, P and Sunindijo, R Y (2022) Drone readiness in the Indonesian construction industry. Construction Economics and Building, 22(4), pp. 36-58. ISSN 2204-9029

Toakley, A R and Marosszeky, M (2003) Towards total project quality - A review of research needs. Engineering, Construction and Architectural Management, 10(3), pp. 219-228. ISSN 0969-9988

Toke, L K and Kalpande, S D (2022) Strategic planning to investigate the decision index of organization for effective total quality management implementation: in context of Indian small and medium enterprises. Journal of Engineering, Design and Technology, 20(3), pp. 749-776. ISSN 1726-0531

Tokede, O; Ahiaga-Dagbui, D and Morrison, J (2022) Attenuating disruptions in knowledge flows in construction projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Toladun, Olawale (2025) Sustainable procurement of infrastructure projects in the Australian construction industry: The perceptions of consultants. PhD thesis, University of New South Wales, Australia.

Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea. DEng thesis, George Washington University, USA.

Tombesi, P (1997) Travels from flatland: The Walt Disney concert hall and the specialization of design knowledge in the building sector. PhD thesis, University of California, Los Angeles, USA.

Tommelein, I D (2020) Design science research in construction management: Multi-disciplinary collaboration on the SightPlan system. Construction Management and Economics, 38(4), pp. 340-354. ISSN 01446193

Tommelein, I D; Levitt, R E and Hayes-Roth, B (1992) Sightplan model for site layout. Journal of Construction Engineering and Management, 118(4), pp. 749-766. ISSN 0733-9364

Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364

Tonetto, M S; Formoso, C T; Saurin, T A; Bonesi De Luca, F; Lora, F P and Lantelme, E (2024) Resilient performance on construction projects in the post-pandemic era: An organizational perspective. Engineering, Construction and Architectural Management, 31(12), pp. 5007-5028. ISSN 0969-9988

Tong, M K L (2011) The management of inter-organisational relationships and project based learning. PhD thesis, Glasgow Caledonian University, UK.

Tonna, Ren P (2021) How stakeholders experience and value the sustainable design elements of a residential high-rise building. PhD thesis, Griffith University, Australia.

Toor, S U R and Ofori, G (2010) Positive psychological capital as a source of sustainable competitive advantage for organizations. Journal of Construction Engineering and Management, 136(3), pp. 341-352. ISSN 0733-9364

Toosi, H; Ghaaderi, M A and Shokrani, Z (2022) Comparative study of academic research on project management in Iran and the world with text mining approach and tf–idf method. Engineering, Construction and Architectural Management, 29(3), pp. 1553-1583. ISSN 0969-9988

Torbica, Z M (1997) Total quality management and customer satisfaction in homebuilding. PhD thesis, University of Florida, USA.

Torbica, Z M and Stroh, R C (1999) Impact of total quality management on home-buyer satisfaction. Journal of Construction Engineering and Management, 125(3), pp. 198-203. ISSN 0733-9364

Torbica, Ž M and Stroh, R C (2001) Customer satisfaction in home building. Journal of Construction Engineering and Management, 127(1), pp. 82-86. ISSN 0733-9364

Torkanfar, Navid (2025) Blockchain-enabled digitalized trust in construction industry: Reforming trust and collaboration through technology. PhD thesis, University of Toronto, Canada.

Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Torrington, J (2007) Evaluating quality of life in residential care buildings. Building Research & Information, 35(5), pp. 514-528. ISSN 0961-3218

Towles, C (2017) Maximizing economic returns for large, publicly funded road infrastructure investments through improved economic, engineering and construction information management. DEng thesis, Ecole de Technologie Superieure, Canada.

Townsend, R and Gershon, M (2020) Attaining successful construction project execution through personnel and communication. Journal of Construction Engineering and Management, 146(9): 04020101, ISSN 0733-9364

Townsend, R S (2019) Successful infrastructure construction project execution. DBA thesis, Temple University, USA.

Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Tran, D H; Tran, K N and Nguyen, N H (2025) A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management. International Journal of Construction Management, 25(10), pp. 1141-1153. ISSN 1562-3599

Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364

Tran, D Q; Harper, C M; Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(9), pp. 2163-2178. ISSN 0969-9988

Tran, D Q and Molenaar, K R (2014) Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management, 21(6), pp. 631-647. ISSN 0969-9988

Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364

Tran, D Q; Molenaar, K R and Kolli, B (2017) Implementation of best-value procurement for highway design and construction in the USA. Engineering, Construction and Architectural Management, 24(5), pp. 774-787. ISSN 0969-9988

Tran, D Q; Nguyen, L D and Faught, A (2017) Examination of communication processes in design-build project delivery in building construction. Engineering, Construction and Architectural Management, 24(6), pp. 1319-1336. ISSN 0969-9988

Trethewy, R W and Atkinson, M (2003) Enhanced safety, health and environment outcomes through improved design. Journal of Engineering, Design and Technology, 1(2), pp. 187-201. ISSN 1726-0531

Tribelsky, E and Sacks, R (2011) An empirical study of information flows in multidisciplinary civil engineering design teams using lean measures. Architectural Engineering and Design Management, 7(2), pp. 85-101. ISSN 1745-2007

Trigunarsyah, B (2004) A review of current practice in constructability improvement: Case studies on construction projects in Indonesia. Construction Management and Economics, 22(6), pp. 567-580. ISSN 01446193

Trigunarsyah, B (2004) Project owners' role in improving constructability of construction projects: An example analysis for Indonesia. Construction Management and Economics, 22(8), pp. 861-876. ISSN 01446193

Trigunarsyah, B (2017) Organizational culture influence on client involvement. Engineering, Construction and Architectural Management, 24(6), pp. 1155-1169. ISSN 0969-9988

Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.

Trinder, L (2018) Design for manufacture and assembly: Its benefits and risks in the UK water industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 152-163. ISSN 17514304

Trinh, M T (2018) Developing resilient safety culture for construction projects in Vietnam. PhD thesis, Western Sydney University, Australia.

Tripathi, K K (2018) Critical success factors for construction organizations in India. PhD thesis, Indian Institute of Technology Delhi, India.

Tripathi, K K; Hasan, A and Neeraj Jha, K (2021) Evaluating performance of construction organizations using fuzzy preference relation technique. International Journal of Construction Management, 21(12), pp. 1287-1300. ISSN 1562-3599

Trost, S M (1998) A quantitative model for predicting the accuracy of early cost estimates for construction projects in the process industry. PhD thesis, Oklahoma State University, USA.

Trost, S M and Oberlender, G D (2003) Predicting accuracy of early cost estimates using factor analysis and multivariate regression. Journal of Construction Engineering and Management, 129(2), pp. 198-204. ISSN 0733-9364

Tsao, C C Y; Tommelein, I D; Swanlund, E S and Howell, G A (2004) Work structuring to achieve integrated product-process design. Journal of Construction Engineering and Management, 130(6), pp. 780-789. ISSN 0733-9364

Tu, B; Zuo, J; Chang, R D; Webber, R J; Xiong, F and Dong, N (2023) A system dynamic model for assessing the level of BIM implementation in construction phase: A China case study. Engineering, Construction and Architectural Management, 30(4), pp. 1321-1343. ISSN 0969-9988

Tuan Son, N; Sherif, M and Mostafa, S (2021) Project stakeholder's engagement and performance: A comparison between complex and non-complex projects using SEM. Built Environment Project and Asset Management, 11(5), pp. 804-818. ISSN 2044-124X

Tucker, R and Abbasi, N (2015) The architecture of teamwork: Examining relationships between teaching, assessment, student learning and satisfaction with creative design outcomes. Architectural Engineering and Design Management, 11(6), pp. 405-422. ISSN 1745-2007

Tucker, R R (2014) Influence of individual perceptions on engineering team performance within design-build infrastructure projects. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Tucker, S N and Ambrose, M D (1998) Innovation and evaluation in process improvement. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Tuffaha, F M; Assaf, S; Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), pp. 195-213. ISSN 2044-124X

Tuholski, S J; Gursel, A P; Tommelein, I D and Bomba, G (2009) Lean comparison using process charts of complex seismic retrofit projects. Journal of Construction Engineering and Management, 135(4), pp. 330-339. ISSN 0733-9364

Tummalapudi, M (2022) Strategic factors for implementing a multiple career path construction doctoral program: A mixed methods study. PhD thesis, Colorado State University, USA.

Turksezer, Z I; Iacovino, C; Giordano, P F and Limongelli, M P (2021) Development and implementation of indicators to assess bridge inspection practices. Journal of Construction Engineering and Management, 147(12): 04021165, ISSN 0733-9364

Turner, Aidan (2022) Detecting the early essence of 'modern' project management: An historic case study approach (hms barham, 1912-1915). PhD thesis, University of the West of England, Bristol, UK.

Turner, J P (1992) Constructability for drilled shafts. Journal of Construction Engineering and Management, 118(1), pp. 77-93. ISSN 0733-9364

Tutesigensi, A; Kibwami, N and Matege, S B (2021) The status of value management practice on construction projects in Uganda and strategies for improvement. Journal of Construction in Developing Countries, 26(2), pp. 251-267. ISSN 1823-6499

Tuuli, M and Acquah, S (2012) Do you feel what i feel? Empowerment contagion in project teams. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Tuuli, M M (2009) Empowerment and control dynamics in project teams: a multilevel examination of the antecedents and jobperformance consequences. PhD thesis, University of Hong Kong, Hong Kong.

Tuuli, M M and Koh, S R T Y (2009) Portfolio of control modes in project teams: A Hong Kong case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Tuuli, M M and Rowlinson, S (2007) Towards a conceptual framework of empowerment and job performance in project teams. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Tuuli, M M and Rowlinson, S (2009) Empowerment in project teams: A multilevel examination of the job performance implications. Construction Management and Economics, 27(5), pp. 473-498. ISSN 1466433X

Tuuli, M M and Rowlinson, S (2010) Impact of leadership style and team context on psychological empowerment in construction project teams. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Tuuli, M M; Rowlinson, S and Koh, T Y (2010) Dynamics of control in construction project teams. Construction Management and Economics, 28(2), pp. 189-202. ISSN 1466433X

Tuuli, M M; Rowlinson, S and Koh, Y T (2010) Control modes and mechanisms in construction project teams: Drivers and consequences. Construction Management and Economics, 28(5), pp. 451-465. ISSN 1466433X

Twum, B A; Kabiri, S and Tutt, D (2023) Managing onsite production pressure and its impact on safety performance in construction: An activity theory analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Tymvios, N and Gambatese, J A (2016) Perceptions about design for construction worker safety: Viewpoints from contractors, designers, and university facility owners. Journal of Construction Engineering and Management, 142(2): 04015078, ISSN 0733-9364

Uddin, M; Mahboub, K C and Goodrum, P M (2011) Effects of nonnormal distributions on highway construction acceptance pay factor calculation. Journal of Construction Engineering and Management, 137(2), pp. 108-118. ISSN 0733-9364

Ugulu, R A; Arewa, A and Allen, S (2020) Project-specific constraints influencing productivity of tradespeople in the Nigerian construction industry. Built Environment Project and Asset Management, 10(1), pp. 94-109. ISSN 2044-124X

Ugwu, M C (1982) Absenteeism in the construction industry: A diagnostic study. PhD thesis, University of Missouri - Columbia, USA.

Ugwu, O O and Haupt, T C (2005) Key performance indicators for infrastructure sustainability: a comparative study between Hong Kong and South Africa. Journal of Engineering, Design and Technology, 3(1), pp. 30-43. ISSN 1726-0531

Ugwuoke, A A (2018) Innovation persistence during economic crisis by Nigeria's construction contracting firms: an investigation of the critical success factors. PhD thesis, University of Salford, UK.

Ulrich de Alencastro, J P (2019) The impact of quality management on the thermal performance of social housing in the United Kingdom. PhD thesis, University of Plymouth, UK.

Umar, T and Egbu, C (2018) Perceptions on safety climate: A case study in the Omani construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(6), pp. 251-263. ISSN 17514304

Umeokafor, N; Windapo, A O; Manu, P; Diugwu, I and Haroglu, H (2023) Critical barriers to prevention through design in construction in developing countries: A qualitative inquiry. Engineering, Construction and Architectural Management, 30(7), pp. 3014-3042. ISSN 0969-9988

Umuhoza, E and An, S H (2024) Ann model predicting quality performance for building construction projects in Rwanda. International Journal of Construction Management, 24(15), pp. 1679-1688. ISSN 1562-3599

Umuhoza, E; Bitamba, B F and An, S H (2023) Causes and preventive strategies of scope creep for building construction projects in democratic republic of Congo and Rwanda. International Journal of Construction Management, 23(7), pp. 1264-1275. ISSN 1562-3599

Underwood, J and Isikdag, U (2011) Emerging technologies for BIM 2.0. Construction Innovation, 11(3), pp. 252-258. ISSN 1471-4175

Ungureanu, L C; Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules' quality. Engineering, Construction and Architectural Management, 26(2), pp. 224-244. ISSN 0969-9988

Upadhyay, A K and Jain, K (2016) Modularity in nuclear power plants: A review. Journal of Engineering, Design and Technology, 14(3), pp. 526-542.

Urup, L (2016) Integrated design-build management: studying institutional processes to understand project coordination & performance. PhD thesis, Chalmers University of Technology, Sweden.

Uusitalo, P; Seppänen, O; Peltokorpi, A and Olivieri, H (2019) Solving design management problems using lean design management: The role of trust. Engineering, Construction and Architectural Management, 26(7), pp. 1387-1405. ISSN 0969-9988

V E, S; Shin, C and Cho, Y (2021) Efficient energy consumption prediction model for a data analytic-enabled industry building in a smart city. Building Research & Information, 49(1), pp. 127-143. ISSN 0961-3218

Vahabi, A; Nasirzadeh, F and Mills, A (2022) Impact of project briefing clarity on construction project performance. International Journal of Construction Management, 22(13), pp. 2504-2516. ISSN 1562-3599

Vahabi, A; Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: A fuzzy hybrid simulation approach. Construction Management and Economics, 40(4), pp. 278-295. ISSN 01446193

Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988

Vahabi, Ali (2018) Investigating the impact of project scope definition on design-build project performance: A system dynamics approach. PhD thesis, Queensland University of Technology, Australia.

Vahanvati, M; McEvoy, D and Iyer-Raniga, U (2023) Inclusive and resilient shelter guide: Accounting for the needs of informal settlements in Solomon Islands. International Journal of Disaster Resilience in the Built Environment, 14(4), pp. 577-590. ISSN 1759-5916

Vahidi, A (2025) Towards circular concrete: The implementation of circular concrete in the construction industry. PhD thesis, Delft University of Technology, Netherlands.

Vakeva-Baird, S; Tahmasebi, F; Williams, J J and Mumovic, D (2025) Effective interdisciplinary stakeholder engagement in net zero building design. Buildings & Cities, 6(1), pp. 654-673. ISSN 2632-6655

Vakili-Ardebili, A and Boussabaine, A H (2007) Creating value through sustainable building design. Architectural Engineering and Design Management, 3(2), pp. 83-92. ISSN 1745-2007

Valentin, V (2011) Impact assessment of inter-organizational dynamics on the performance metrics of capital-intensive projects. PhD thesis, Purdue University, USA.

Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364

Valkonen, T; Lindberg, A; Alhava, O; Talebi, S; Koskela, L and Seppänen, O (2026) Tolerance management in prefabrication of mechanical, electrical, and plumbing installations. Construction Management and Economics, 44(4), pp. 279-299. ISSN 0144-6193

Valverde-Gascueña, N; Navarro-Astor, E; Fuentes-del-Burgo, J and Ruiz-Fernandez, J P (2011) Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Van Den Bossche, N; Blommaert, A and Daniotti, B (2023) The impact of demographical, geographical and climatological factors on building defects in Belgium. International Journal of Building Pathology and Adaptation, 41(3), pp. 549-573. ISSN 23984708

Van Hove, M Y C; Deurinck, M; Lameire, W; Laverge, J; Janssens, A and Delghust, M (2023) Large-scale statistical analysis and modelling of real and regulatory total energy use in existing single-family houses in flanders. Building Research & Information, 51(2), pp. 203-222. ISSN 0961-3218

Van de Ruitenbeek, H K M (2012) Evolutionary, unconscious design support for the architectural, engineering and construction industry. PhD thesis, Delft University of Technology, Netherlands.

Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.

Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.

Vashani, H; Sullivan, J and El Asmar, M (2016) DB 2020: Analyzing and forecasting design-build market trends. Journal of Construction Engineering and Management, 142(6): 04016008, ISSN 0733-9364

Vaughan, J L; Leming, M L; Liu, M and Jaselskis, E (2013) Cost-benefit analysis of construction information management system implementation: Case study. Journal of Construction Engineering and Management, 139(4), pp. 445-455. ISSN 0733-9364

Vaz-Serra, P; Edwards, P and Aranda-Mena, G (2022) An early-stage project complexity assessment tool for the AEC industry. Construction Innovation, 22(2), pp. 242-262. ISSN 1471-4175

Venkataraman, V (2017) Investigating the impact of project management factors on green building project delivery using link analysis and system dynamics techniques. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Venu Jaya, S.; Swarnakar, V.; Acquaye, A.; Khalfan, M. and El Fadel, M. (2026) Unlocking 3r-driven value engineering potential in sustainable construction: An empirical analysis of drivers, challenges, benefits, tools and techniques. Journal of Engineering, Design and Technology, 24(6), ISSN 1726-0531

Verheij, J M (2005) Process-mediated planning of AEC projects through structured dialogues. PhD thesis, Georgia Institute of Technology, USA.

Vermeer, D M M (2019) Collective learning in strategic public private partnership procurement systems for social infrastructure. PhD thesis, University of London, University College London, UK.

Vermeer, Daniel Marinus Maria (2019) Collective learning in strategic public private partnership (PPP) procurement systems for social infrastructure. PhD thesis, University College London, UK.

Vernikos, V K (2016) Realising offsite construction in the civil engineering and infrastructure sector. PhD thesis, Loughborough University, UK.

Vesali Mahmoud, N (2016) A comprehensive decision support framework in the front-end phase of major transportation projects. PhD thesis, Florida International University, USA.

Viana, D D; Formoso, C T and Bataglin, F S (2022) Requirements for developing production planning and control systems for engineer-to-order industrialized building systems. Construction Management and Economics, 40(7-8), pp. 638-652. ISSN 01446193

Vidogah, W (1997) Claims on construction contracts: a new management framework. PhD thesis, University of Wolverhampton, UK.

Viklund Tallgren, M; Roupe, M and Johansson, M (2015) An empowered collaborative planning method in a Swedish construction company: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Vilasini, N (2014) Generating value in alliance contracts through the lean concept. PhD thesis, Auckland University of Technology, New Zealand.

Vilasini, N and Neitzert, T (2012) Improving project performance through worker participation in alliance projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Villa, J and Ariaratnam, S T (2013) Project management functions for the light industrial sector in Mexico. International Journal of Construction Education and Research, 9(3), pp. 163-182. ISSN 1557-8771

Vilventhan, A and Rajadurai, R (2020) 4D bridge information modelling for management of bridge projects: A case study from India. Built Environment Project and Asset Management, 10(3), pp. 423-435. ISSN 2044-124X

Vinodh, S; Selvaraj, T; Chintha, S K and K. E. K., V (2015) Development of value stream map for an Indian automotive components manufacturing organization. Journal of Engineering, Design and Technology, 13(3), pp. 380-399.

Vinodh, S; Somanaathan, M and Arvind, K R (2013) Development of value stream map for achieving leanness in a manufacturing organization. Journal of Engineering, Design and Technology, 11(2), pp. 129-141. ISSN 1726-0531

Viswalekshmi, B R and Bendi, D (2026) Construction waste reduction measures for high-rise buildings in India – a stakeholder's perspective. Construction Innovation, 26(2), pp. 491-530. ISSN 1471-4175

Vives, A; Benavides, J and Paris, A M (2010) Selecting infrastructure delivery modalities: No time for ideology or semantics. Journal of Construction Engineering and Management, 136(4), pp. 412-418. ISSN 0733-9364

Vora, C; Aryal, A; Willoughby, S and Wang, C (2024) Investigating stakeholder perception and developing a decision framework for robot adoption in construction. Journal of Construction Engineering and Management, 150(4): 04024012, ISSN 0733-9364

Wafa, M A (1986) An investigation into the factors influencing the success of decision support systems in the construction industry. PhD thesis, Clemson University, USA.

Wagner, H; Kim, A J and Gordon, L (2013) Relationship between personal protective equipment, self-efficacy, and job satisfaction of women in the building trades. Journal of Construction Engineering and Management, 139(10): 04013005, ISSN 0733-9364

Wahab, A (2024) Integrating building information modeling (BIM) and blockchain technology in the pre-construction planning processes. PhD thesis, Mississippi State University, USA.

Wahedi, H (2016) Site practice: The role of design drawings within social communities. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Wai, S H; Aminah, M Y and Syuhaida, I (2013) Social infrastructure project success criteria: an exploratory study. International Journal of Construction Management, 13(3), pp. 95-104. ISSN 1562-3599

Walker, A and Hughes, W P (1984) Private industrial project management: A systems-based case study. Construction Management and Economics, 2(2), pp. 93-110. ISSN 01446193

Walker, A and Hughes, W P (1987) A project managed by a multi-disciplinary practice: A systems-based case study. Construction Management and Economics, 5(2), pp. 123-140. ISSN 01446193

Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(6), pp. 648-673. ISSN 0969-9988

Walker, D and Lloyd-Walker, B (2012) Understanding early contractor involvement (ECI) procurement forms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Walker, D H T (1994) An investigation into factors that determine building construction time performance. PhD thesis, Royal Melbourne Institute of Technology, Australia.

Walker, D H T (1995) An investigation into construction time performance. Construction Management and Economics, 13(3), pp. 263-274. ISSN 01446193

Walker, D H T (1995) The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(1), pp. 4-20. ISSN 1358-9180

Walker, D H T (1996) The contribution of the construction management team to good construction time performance: An Australian experience. Journal of Construction Procurement, 2(2), pp. 4-18. ISSN 1358-9180

Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(1), pp. 42-55. ISSN 1358-9180

Walker, D H T (1998) The contribution of the client representative to the creation and maintenance of good project inter-team relationships. Engineering, Construction and Architectural Management, 5(1), pp. 51-57. ISSN 0969-9988

Walker, D H T (2002) Enthusiasm, commitment and project alliancing: An Australian experience. Construction Innovation, 2(1), pp. 15-31. ISSN 1471-4175

Walker, D H T; Peters, R J; Hampson, K D and Thompson, M J (2001) Achieving a responsive industrial relations environment for construction industry workers: A project alliancing case study. Construction Innovation, 1(4), pp. 211-225. ISSN 1471-4175

Walker, D H T and Vines, M W (1997) Construction time performance in multi-unit residential construction: Insight into the role of procurement methods. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Walker, D H T and Vines, M W (2000) Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(3), pp. 278-284. ISSN 0969-9988

Walker D.H.T, S Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies. Construction Management and Economics, 20(1), pp. 31-44. ISSN 01446193

Wall, R; Ankrah, N and Charlson, J (2016) An investigation into the different styles of the lawyer and construction specialist when mediating construction disputes. International Journal of Law in the Built Environment, 8(2), pp. 137-160. ISSN 1756-1450

Wallace Jr., J T (2016) Risk system interrelationships over a construction project's life cycle: A correlational study. PhD thesis, Capella University, USA.

Walters, R; Jaselskis, E; Zhang, J; Mueller, K and Kaewmoracharoen, M (2008) Using scanning lasers to determine the thickness of concrete pavement. Journal of Construction Engineering and Management, 134(8), pp. 583-591. ISSN 0733-9364

Wan, M.; Li, L.; Yuan, M. and Yin, X. (2026) Modeling stakeholder-associated risk networks in the life cycle of building-integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(7), pp. 5469-5494. ISSN 0969-9988

Wanaguru, K; Mallawaarachchi, H and Vijerathne, D (2025) Prisma-based review and development of a circularity assessment framework for building construction material selection. Built Environment Project and Asset Management, 15(3), pp. 557-573. ISSN 2044-124X

Wanberg, J; Harper, C; Hallowell, M R and Rajendran, S (2013) Relationship between construction safety and quality performance. Journal of Construction Engineering and Management, 139(10): 04013004, ISSN 0733-9364

Wandahl, S; Pérez, C T; Salling, S; Neve, H H; Lerche, J and Petersen, S (2021) The impact of construction labour productivity on the renovation wave. Construction Economics and Building, 21(3), pp. 11-32. ISSN 2204-9029

Wang, Y.; He, Q.; Xie, J. and Wang, Z. (2026) Formalization or improvisation: The influence of team mindfulness on team resilience. Engineering, Construction and Architectural Management, 33(5), pp. 3516-3541. ISSN 0969-9988

Wang, Z.; Hu, X.; Wei, A.; Yang, W. and Dong, Z. (2026) A blockchain-based system for just-in-time in construction supply chains. Built Environment Project and Asset Management, 16(2), pp. 377-395. ISSN 2044-124X

Wang, C; Gao, F; Cui, B; Huang, M M; Wu, M; Mao, L and Zheng, A (2024) Geometric quality assessment of precast concrete (PC) elements based on 3D structural light scanning. Architectural Engineering and Design Management, 20(2), pp. 303-319. ISSN 1745-2007

Wang, C; Li, B; Li, B and Baldwin, A (2017) Case study of "project controlling" on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(6), pp. 862-874. ISSN 0969-9988

Wang, C; Liu, H; Sing, M C P and Wu, J (2024) Pre-construction duration of public-private partnership projects: Evidence from China. Engineering, Construction and Architectural Management, 31(4), pp. 1715-1729. ISSN 0969-9988

Wang, C H; Tsai, C H and Cheng, Y Y (2007) Knowledge-based diagnosis model for PCM executing problems in public construction. Construction Management and Economics, 25(2), pp. 129-142. ISSN 1466433X

Wang, D; Huang, R; Qiao, Y; Sheng, Z; Li, K and Zhao, L (2023) How perceived leader-member exchange differentiation affects construction workers' safety citizenship behavior: Organizational identity and felt safety responsibility as mediators. Journal of Construction Engineering and Management, 149(11): 04023110, ISSN 0733-9364

Wang, D; Jia, J; Jiang, S; Liu, T and Ma, G (2024) Differential effects of contextual factors on promotive and prohibitive voice in construction projects: A multiteam system perspective. Engineering, Construction and Architectural Management, 31(3), pp. 1061-1080. ISSN 0969-9988

Wang, D; Wang, X; Liu, M; Liu, H and Liu, B (2021) Managing public-private partnerships: A transmission pattern of underlying dynamics determining project performance. Engineering, Construction and Architectural Management, 28(4), pp. 1038-1059. ISSN 0969-9988

Wang, H; Chen, X; Wang, J; Guan, W and Wei, S (2025) Multiobjective trade-off optimization of time, cost, quality, and carbon emission in the building construction stage. Journal of Construction Engineering and Management, 151(4): 04025009, ISSN 0733-9364

Wang, H and Meng, X (2016) Improving information/knowledge management through the use of BIM: A literature review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Wang, H; Meng, X and McGetrick, P J (2018) Incorporating knowledge of construction and facility management into the design in the BIM environment. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Wang, J (2022) BIM and construction dispute management. PhD thesis, University of Manchester, UK.

Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y and Ashuri, B (2023) Data-driven assessment on the corporate credit scoring mechanism for Chinese construction supervision companies. Construction Management and Economics, 41(11-12), pp. 961-975. ISSN 01446193

Wang, J; Luo, H; Pena-Mora, F; Zhou, W and Fang, W (2024) An integrated BIM-IoT framework for real-time quality monitoring in construction site. Journal of Construction Engineering and Management, 150(11): 05024013, ISSN 0733-9364

Wang, L (2020) Home intelligent lighting control system based on wireless sensor. Journal of Engineering, Design and Technology, 18(5), pp. 1231-1240. ISSN 1726-0531

Wang, L; Lee, J; Nimawat, J; Han, K and Gupta, A (2024) Integrated 4D design change management model for construction projects. Journal of Construction Engineering and Management, 150(5): 04024023, ISSN 0733-9364

Wang, L; Zhang, P; Zhang, P; Li, R; Zhang, Y and Wu, Y (2018) A systematic approach for public-private partnership projects CSFs evaluation. Engineering, Construction and Architectural Management, 25(9), pp. 1127-1145. ISSN 0969-9988

Wang, Liannian (2025) Advancing construction requirements management through 4D BIM and generative AI. PhD thesis, North Carolina State University, USA.

Wang, M; Yao, G; Yang, Y; Li, R and Deng, R (2025) A decision support tool for dust prevention and control in construction. Journal of Construction Engineering and Management, 151(5): 04025037, ISSN 0733-9364

Wang, P (2006) Production-based large scale construction simulation modeling. PhD thesis, University of Alberta, Canada.

Wang, P; Mohamed, Y; Abourizk, S M and Rawa, A R T (2009) Flow production of pipe spool fabrication: Simulation to support implementation of lean technique. Journal of Construction Engineering and Management, 135(10), pp. 1027-1038. ISSN 0733-9364

Wang, R C and Liang, T F (2004) Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22(10), pp. 1047-1056. ISSN 01446193

Wang, S; Tang, W and Li, Y (2013) Relationship between owners' capabilities and project performance on development of hydropower projects in China. Journal of Construction Engineering and Management, 139(9), pp. 1168-1178. ISSN 0733-9364

Wang, T (2022) Motivating management: evidence from construction project teams. PhD thesis, University of Hong Kong, Hong Kong.

Wang, T and Feng, J (2023) Optimal review strategy for concurrent execution of design-construction tasks in DB mode. Journal of Construction Engineering and Management, 149(1): 04022139, ISSN 0733-9364

Wang, T K; Ford, D N; Chong, H Y and Zhang, W (2018) Causes of delays in the construction phase of Chinese building projects. Engineering, Construction and Architectural Management, 25(11), pp. 1534-1551. ISSN 0969-9988

Wang, X and Chong, H-Y (2015) Setting new trends of integrated building information modelling for construction industry. Construction Innovation, 15(1), pp. 2-6. ISSN 1471-4175

Wang, Y (2009) Measuring competitiveness of chinese professional design firms. PhD thesis, University of Reading, UK.

Wang, Y (2022) Monitoring, modelling and analysis of occupants' operation of windows, use of air purifiers and smart air quality control in low-energy residential buildings. PhD thesis, University College London, UK.

Wang, Y and Jin, X (2019) Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example. Engineering, Construction and Architectural Management, 26(7), pp. 1348-1366. ISSN 0969-9988

Wang, Y; Liu, J; Zuo, J and Rameezdeen, R (2020) Ways to improve the project management efficiency in a centralized public procurement system: A structural equation modeling approach. Engineering, Construction and Architectural Management, 27(1), pp. 168-185. ISSN 0969-9988

Wang, Y-P (2021) How level of detail of activity duration data influences look-ahead schedule performance in prefabricated construction. PhD thesis, Stanford University, USA.

Wang, Y-R (2002) Applying the PDRI in project risk management. PhD thesis, University of Texas at Austin, USA.

Wang, Z; Jia, L; Lv, J and Huang, J (2024) Minimization of rebar cutting waste using BIM and cutting pattern-oriented multiobjective optimization. Journal of Construction Engineering and Management, 150(11): 04024166, ISSN 0733-9364

Wang, Z; Shen, Y and Li, K (2025) Resilience strengthening paths for precast production management in prefabricated construction. Journal of Construction Engineering and Management, 151(8): 04025095, ISSN 0733-9364

Waqar, A. and Shafiq, N. (2026) Impact of digital twin technology implementation on the lifecycle management of structural assets. Engineering, Construction and Architectural Management, 33(7), pp. 5715-5736. ISSN 0969-9988

Ward, B (2015) Integrated asset management systems for water infrastructure. EngD thesis, University of Exeter, UK.

Warrier, G A and Palaniappan, S (2025) Uncertainty in the embodied energy assessment of buildings: a case of EWS type low-cost house in India. International Journal of Construction Management, 25(8), pp. 911-922. ISSN 1562-3599

Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement. PhD thesis, KTH Royal Institute of Technology, Sweden.

Warsame, A; Song, H S and Lind, H (2014) Quality of road construction projects in sweden between 1990 and 2010. Construction Economics and Building, 14(1), pp. 78-87. ISSN 2204-9029

Waters, J and Raidén, A B (2008) Consideration of personal safety in project deployment. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Watton, J; Unterhitzenberger, C; Locatelli, G and Invernizzi, D C (2023) The cost drivers of infrastructure projects: Definition, classification, and conceptualization. Journal of Construction Engineering and Management, 149(11): 03123006, ISSN 0733-9364

Way, M and Bordass, B (2005) Making feedback and post-occupancy evaluation routine 2: Soft landings: involving design and building teams in improving performance. Building Research & Information, 33(4), pp. 353-360. ISSN 0961-3218

Webb, E (2014) Management of multi-cultural teams on international joint venture megaprojects in Asia. PhD thesis, Loughborough University, UK.

Weber, P A (2000) Requisite skill differences of baccalaureate graduates among three building disciplines. PhD thesis, Colorado State University, USA.

Weddikkara, C (2003) The impact of professional culture on dispute resolution in the building industries of Australia and Sri-Lanka. PhD thesis, Murdoch University, Australia.

Weddikkara, C and Devapriya, K (2001) Demand and supply trends and construction industry development: A case study in the Sri Lankan construction industry. Construction Economics and Building, 1(1), pp. 91-105. ISSN 2204-9029

Weerasinghe, A S; Ramachandra, T and Nawarathna, A (2019) Effects of green retrofits: A case of industrial manufacturing buildings in Sri Lanka. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Weerasinghe, A S; Rasheed, E O and Rotimi, J O B (2021) A dilemma between building indoor environment preferences and occupant energy behaviours. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Weerasinghe, U G D (2012) Development of a framework to assess sustainability of building projects. PhD thesis, University of Calgary, Canada.

Wei, F; Hwang, B G; Zainal, N S B and Zhu, H (2024) Trust, team effectiveness, and strategies: A comparative study between virtual and face-to-face teams. Journal of Construction Engineering and Management, 150(7): 04024065, ISSN 0733-9364

Weinert, R A (1989) A study of the agency construction management method of project delivery as a viable alternative when building new schools. DPA thesis, University of La Verne, USA.

Weiss, A P W (2006) Value for money: defining and measuring 'value' in MoD's acquisition policy of obtaining best value for money. PhD thesis, University College London, UK.

Welch, J A (2024) Ancient Maya labor relations: Constructing a palace at Ucanha, Yucatán, Mexico. PhD thesis, Yale University, USA.

Weldu, Y W (2016) Automated generation and visualization of initial construction schedules from building information models. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Wells, J (1993) Appropriate building technologies: An appraisal based on case studies of building projects in Senegal and Kenya. Construction Management and Economics, 11(3), pp. 203-216. ISSN 01446193

Wen, H; AbouRizk, S and Mohamed, Y (2025) Gap analysis of digitalization levels in construction and manufacturing: A comparative study of construction 4.0 and industry 4.0. Journal of Construction Engineering and Management, 151(3): 04025001, ISSN 0733-9364

Weshah, N A (2015) Developing an interface management (im) model for construction projects. PhD thesis, University of Calgary, Canada.

Wesonga, R; Tutesigensi, A and Moodley, K (2024) A comparative review of energy aggregation policies for prosumerisation of green energy in the construction phase in UK and Uganda. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Westling, H (1991) Technology procurement for innovation in Swedish construction. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Whaley, A (2020) Conflict and claims culture in construction. PhD thesis, University of Salford, UK.

Whang, S W; Flanagan, R; Kim, S and Kim, S (2017) Contractor-led critical design management factors in high-rise building projects involving multinational design teams. Journal of Construction Engineering and Management, 143(5): 06016009, ISSN 0733-9364

Whang, S W; Park, K S and Kim, S (2019) Critical success factors for implementing integrated construction project delivery. Engineering, Construction and Architectural Management, 26(10), pp. 2432-2446. ISSN 0969-9988

Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.

Wheeler, Doug (2025) The influence of project type and project manager capability on project governance. PhD thesis, Queensland University of Technology, Australia.

Whitaker, R (2022) The influence of end user requirements to inform built asset design. PhD thesis, Leeds Beckett University, UK.

Whyte, J; Lindkvist, C and Ibrahim, N H (2013) From projects into operations: Lessons for data handover. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 86-93. ISSN 17514312

Whyte, J and Lobo, S (2010) Coordination and control in project-based work: Digital objects and infrastructures for delivery. Construction Management and Economics, 28(6), pp. 557-567. ISSN 1466433X

Wijeratne, P U; Gunarathna, C; Yang, R J; Wu, P; Hampson, K and Shemery, A (2024) BIM enabler for facilities management: A review of 33 cases. International Journal of Construction Management, 24(3), pp. 251-260. ISSN 1562-3599

Wijewansha, A S; Tennakoon, G A; Waidyasekara, K and Ekanayake, B J (2021) Implementation of circular economy principles during pre-construction stage: The case of Sri Lanka. Built Environment Project and Asset Management, 11(4), pp. 750-766. ISSN 2044-124X

Wijewickrama, M K C S; Chileshe, N; Rameezdeen, R and Ochoa, J J (2020) Best practices for diverting demolition waste from landfill: A systematic literature review. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Wilkinson, R; Sherratt, F and Farrell, P (2015) Knowledge management on site: A case study project. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 99-109. ISSN 17514304

Wilkinson, S (2001) An analysis of the problems faced by project management companies managing construction projects. Engineering, Construction and Architectural Management, 8(3), pp. 160-170. ISSN 0969-9988

Wilkinson, S J and Reed, R (2011) Examining and quantifying the drivers behind alterations and extensions to commercial buildings in a central business district. Construction Management and Economics, 29(7), pp. 725-735. ISSN 1466433X

Willan, C M (2019) Life in the gap: how does a construction company respond to the challenge of targets for energy and carbon in-use? PhD thesis, University College London, UK.

Willan, Catherine M (2019) Life in the gap: How does a construction company respond to the challenge of targets for energy and carbon in-use? PhD thesis, University College London, UK.

Willar, D; Trigunarsyah, B and Coffey, V (2016) Organisational culture and quality management system implementation in Indonesian construction companies. Engineering, Construction and Architectural Management, 23(2), pp. 114-133. ISSN 0969-9988

Willems, S; Saelens, D and Heylighen, A (2022) Discrepancies between predicted and actual indoor environmental (dis)comfort: The role of hospitalized patients' adaptation strategies. Building Research & Information, 50(7), pp. 792-809. ISSN 0961-3218

Willenbrock, J H and Thomas, H R (2007) History of construction, engineering, and management in the department of civil and environmental engineering at penn state. Journal of Construction Engineering and Management, 133(9), pp. 644-651. ISSN 0733-9364

Williams, T (2013) The management of renewable energy technologies implementations within a contracting organisation's processes. EngD thesis, Loughborough University, UK.

Williams T, W M R P (2013) Target cost contracts: Adopting innovative incentive mechanisms to improve the project delivery process. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Willmer, G (1988) Development of risk models for engineering construction projects. PhD thesis, University of Manchester, UK.

Willoughby, K A (1999) Modelling assistance for project procurement and disposal decisions. PhD thesis, University of Calgary, Canada.

Winch, G M and Carr, B (2001) Processes, maps and protocols: Understanding the shape of the construction process. Construction Management and Economics, 19(5), pp. 519-531. ISSN 01446193

Windapo, A O and Goulding, J (2013) Value-based perspectives of stakeholders' building requirements in low cost and government subsidised housing projects in South Africa. Construction Innovation, 13(4), pp. 424-444. ISSN 1471-4175

Winter, M and Norman, T (2011) OHSAS 18001 in a UK county highways and transportation department. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 49-54. ISSN 17514312

Wofford, T D (2003) A study of worker demographics and workplace job satisfaction for employees in a global engineering and construction organization. PhD thesis, Nova Southeastern University, USA.

Woldesenbet, A K (2014) Highway infrastructure data and information integration & assessment framework: A data-driven decision-making approach. PhD thesis, Iowa State University, USA.

Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.

Wong, K. K. W.; Chan, J. H. L. and Ng, T. S. T. (2025) KPIs for engineering and construction contract of new engineering contract in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 29-40. ISSN 1751-4304

Wong, C H (2007) ICT implementation and evolution: Case studies of intranets and extranets in UK construction enterprises. Construction Innovation, 7(3), pp. 254-273. ISSN 1471-4175

Wong, F W H; Lam, P T I and Shen, L Y (2004) A dynamic design management system for improving buildability of construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wong, J K W; Oladinrin, O T; Ho, C M F; Guilbert, E and Kam, R (2022) Assessment of video-based e-learning in a construction measurement course. International Journal of Construction Management, 22(1), pp. 1-7. ISSN 1562-3599

Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193

Wong, M K (2006) A study of capacity predictions for driven piles by dynamic pile testing. PhD thesis, University of Hong Kong, Hong Kong.

Wong, P S P; Cheung, S O and Ho, P K M (2005) Contractor as trust initiator in construction partnering: prisoner's dilemma perspective. Journal of Construction Engineering and Management, 131(10), pp. 1045-1053. ISSN 0733-9364

Wong, P S P; Holdsworth, S; Crameri, L and Lindsay, A (2019) Does carbon accounting have an impact on decision-making in building design? International Journal of Construction Management, 19(2), pp. 149-161. ISSN 1562-3599

Wong Chong, Oscar (2022) IFC-based system and methods to support analysis of robot-assisted offsite construction. PhD thesis, Purdue University, USA.

Wongbumru, T and Dewancker, B (2016) Post-occupancy evaluation of user satisfaction: A case study of "old" and "new" public housing schemes in Bangkok. Architectural Engineering and Design Management, 12(2), pp. 107-124. ISSN 1745-2007

Woo, J; Rajagopalan, P; Francis, M and Garnawat, P (2021) An indoor environmental quality assessment of office spaces at an urban Australian university. Building Research & Information, 49(8), pp. 842-858. ISSN 0961-3218

Woo, Jeyoung (2024) Engineering design quality defects: Causal factors, interactions between causal factors, and mitigation strategies. PhD thesis, University of Texas at Austin, USA.

Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.

Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(2), pp. 291-309. ISSN 1609-9451

Wood, G; Davis, P; Eadie, R; Perera, S and Heaney, G (2011) Key process area mapping in the production of an e-capability maturity model for UK construction organisations. Journal of Financial Management of Property and Construction, 16(3), pp. 197-210. ISSN 1366-4387

Wood, G and Ellis, R (2001) An exploration of approaches to risk management applications within UK construction projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Wood, H and Ashton, P (2009) Factors of complexity in construction projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Wood, H L (2010) Modelling project complexity at the pre construction stage. PhD thesis, University of Brighton, UK.

Wood, H L and Ashton, P (2007) An investigation to identify the role of pre-construction site investigative information used by small medium sized enterprises (SME). In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Wood, H L and Ashton, P (2010) Modelling project complexity. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Wood, H L and Gidado, K (2008) An overview of complexity theory and its application to the construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Wood, X; Ghimire, P; Kim, S; Barutha, P and Jeong, H D (2024) Framework for evaluating the success of integrated project delivery in the industrial construction sector: A mixed methods approach & machine learning application. Construction Economics and Building, 24(1-2), pp. 94-118. ISSN 2204-9029

Wood H L, P P F E R P (2013) Understanding complexity in the AEC industry. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Woodhead, R (1997) Exploring the hurdle rate in preparation for a value management workshop planning session. Journal of Financial Management of Property and Construction, 2(2), pp. 21-38. ISSN 1366-4387

Woodhead, R M and Male, S P (2000) The conditioning effect of objective decision-making on the client's capital proposal. Engineering, Construction and Architectural Management, 7(3), pp. 300-306. ISSN 0969-9988

Wu, C; Wu, P; Jiang, R; Wang, J; Wang, X and Wan, M (2022) Evaluating the economic and social benefits of multiutility tunnels with an agent-based simulation approach. Engineering, Construction and Architectural Management, 29(1), pp. 1-25. ISSN 0969-9988

Wu, Chee Shien Jeremy (2008) A comparative study of three international construction firms: Knowledge management infrastructures for optimising organisations' learning. PhD thesis, University of Sydney, Australia.

Wu, G; Liu, C; Zhao, X; Zuo, J and Zheng, J (2022) Effects of fairness perceptions on conflicts and project performance in Chinese megaprojects. International Journal of Construction Management, 22(5), pp. 832-848. ISSN 1562-3599

Wu, G; Zhao, X; Zuo, J and Zillante, G (2019) Effects of team diversity on project performance in construction projects. Engineering, Construction and Architectural Management, 26(3), pp. 408-423. ISSN 0969-9988

Wu, H; Zhang, P; Li, H; Zhong, B; Fung, I W H and Lee, Y Y R (2022) Blockchain technology in the construction industry: Current status, challenges, and future directions. Journal of Construction Engineering and Management, 148(10): 03122007, ISSN 0733-9364

Wu, J (2008) A behavioral analysis of learning processes amongst construction project team members in China. PhD thesis, University of Hong Kong, Hong Kong.

Wu, J; Liu, H J; Sing, M C P; Humphrey, R and Zhao, J (2020) Public-private partnerships: Implications from policy changes for practice in managing risks. Engineering, Construction and Architectural Management, 27(9), pp. 2253-2269. ISSN 0969-9988

Wu, P (2011) Application of the lean philosophy to reduce carbon emissions in the precast concrete industry of Singapore. PhD thesis, National University of Singapore, Singapore.

Wu, S; Yu, L; Cao, T; Yuan, C and Du, Y (2023) How dependence asymmetry and explicit contract shape contractor-subcontractor collaboration: A psychological perspective of fairness. Journal of Construction Engineering and Management, 149(11): 04023103, ISSN 0733-9364

Wu, Z; Wang, Y and Liu, M (2024) Job stress and burnout among construction professionals: The moderating role of online emotions. Engineering, Construction and Architectural Management, 31(12), pp. 4831-4851. ISSN 0969-9988

Wuni, I. Y. and Eshun, B. T. B. (2026) A state-of-the-art review of the application of interpretive structural modelling in construction management studies. International Journal of Construction Management, 26(10), pp. 2116-2136. ISSN 1562-3599

Wuni, I Y (2025) Developing a multidimensional risk assessment model for sustainable construction projects. Engineering, Construction and Architectural Management, 32(6), pp. 4155-4173. ISSN 0969-9988

Wuni, I Y and Shen, G Q (2020) Stakeholder management in prefabricated prefinished volumetric construction projects: Benchmarking the key result areas. Built Environment Project and Asset Management, 10(3), pp. 407-421. ISSN 2044-124X

Wuni, I Y; Shen, G Q and Antwi-Afari, M F (2023) Exploring the design risk factors for modular integrated construction projects. Construction Innovation, 23(1), pp. 213-228. ISSN 1471-4175

Wuni, I Y; Shen, G Q and Darko, A (2022) Best practices for implementing industrialized construction projects: Lessons from nine case studies. Construction Innovation, 22(4), pp. 915-938. ISSN 1471-4175

Wuni, I Y; Shen, G Q; Ogungbile, A J and Ayitey, J Z (2022) Four-pronged decision support framework for implementing industrialized construction projects. Construction Innovation, 22(2), pp. 263-283. ISSN 1471-4175

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387

Wyke, S; Lindhard, S M and Larsen, J K (2024) Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2415-2436. ISSN 0969-9988

Xenidis, Y and Angelides, D (2005) The financial risks in build-operate-transfer projects. Construction Management and Economics, 23(4), pp. 431-441. ISSN 01446193

Xenidis, Y and Angelides, D (2005) The legal risks in build-operate-transfer projects. Journal of Construction Research, 6(2), pp. 273-292. ISSN 1609-9451

Xia, B; Wu, T; Skitmore, M; Chen, Q; Li, M and Zuo, J (2016) Delivering sustainable communities: A case study in China. Built Environment Project and Asset Management, 6(3), pp. 253-267. ISSN 2044-124X

Xia, N; Wang, X; Wang, Y; Yang, Q and Liu, X (2017) Lifecycle cost risk analysis for infrastructure projects with modified Bayesian networks. Journal of Engineering, Design and Technology, 15(1), pp. 79-103.

Xiang, Y; Bu, J; Zhu, K; Ma, K; Opoku, A; Florez-Perez, L; Zhang, H and Wu, Y (2023) Reconsidering adaptive industrialized construction in Chinese rural areas: Responding to the challenge of COVID-19. Building Research & Information, 51(3), pp. 316-332. ISSN 0961-3218

Xiao, L.; Fan, P.; Shen, G. Q.; Ma, G.; Jia, J. and Zheng, X. (2026) Leveraging deep reinforcement learning to facilitate the transition from knowledge diversity to knowledge creation in construction project teams. Journal of Construction Engineering and Management, 152(10): 04026175, ISSN 0733-9364

Xiao, H and Noble, T (2014) Bim's impact on the project manager. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Xie, L.; Yu, Z. and Zhao, X. (2025) Assessing construction safety risks in large urban complex projects: An interval ordinal priority approach. Engineering, Construction and Architectural Management, 33(5), pp. 3996-4018. ISSN 0969-9988

Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.

Xie, H; Hong, Y; Xin, M; Brilakis, I and Shi, O (2025) Identification and analysis of communication barriers for construction projects with time uncertainties. Engineering, Construction and Architectural Management, 32(1), pp. 305-331. ISSN 0969-9988

Xie, J and Thomas Ng, S (2013) Multiobjective Bayesian network model for public-private partnership decision support. Journal of Construction Engineering and Management, 139(9), pp. 1069-1081. ISSN 0733-9364

Xie, W; Zhao, T; Tang, J and Zhang, Y (2017) Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge. Journal of Construction Engineering and Management, 143(8): 04017059, ISSN 0733-9364

Xie, X (2002) Communications in construction design. PhD thesis, Loughborough University, UK.

Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Xiong, Yunjie (2020) A BIM-based interoperability platform in support of building operation and energy management. PhD thesis, Virginia Tech, USA.

Xu, J (2019) In the shadow of a negative past: Repairing and developing trust in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 5-13. ISSN 17514304

Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364

Xu, Ming (2010) The value of critical project decisions: measurement and modelling. PhD thesis, University of Melbourne, Australia.

Xu, S; Zhou, L and Zou, P X W (2024) What influences stakeholders' decision in adopting blockchain-based quality tracking systems in prefabricated construction. Engineering, Construction and Architectural Management, 31(6), pp. 2224-2247. ISSN 0969-9988

Xue, H; Sun, T and Zheng, J (2022) Organizational elements and collaborative organizational citizenship behavior in off-site construction projects: Configurational approach. Journal of Construction Engineering and Management, 148(10): 04022108, ISSN 0733-9364

Yakın, Ö and Güncü, A. (2026) Post-disaster housing recovery models in Turkey: A case study of the 2020 İzmir seferihisar earthquake. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 239-257. ISSN 1759-5908

Yalçınkaya Çalışkan, F and Acar, E (2016) An exploratory analysis of continuing professional development perspectives of Turkish architects according to career stages. Architectural Engineering and Design Management, 12(5), pp. 381-406. ISSN 1745-2007

Yamaura, J T (2018) The value of cloud computing technology in public transportation construction. PhD thesis, University of Washington, USA.

Yan, L.; Wen, S. and Li, Q. (2026) How the two-tier cross-domain control influence contractor's design behavior: A configurational analysis. Engineering, Construction and Architectural Management, 33(3), pp. 2243-2267. ISSN 0969-9988

Yang, Z.; Lu, W.; Wu, L. and Xu, J. (2026) Analysis of workflow variability in modular integrated construction manufacturing using cooperative game theory. Journal of Construction Engineering and Management, 152(8): 04026115, ISSN 0733-9364

Yang, F and Yang, M (2015) Efficiency of public goods provision in wenchuan earthquake-stricken rural areas, Sichuan, China a fuzzy comprehensive evaluation. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 193-205. ISSN 1759-5916

Yang, H (2001) A web-based collaborative decision making system for construction project teams using fuzzy logic. PhD thesis, Loughborough University, UK.

Yang, M L; Chen, S J and Chen, S T (2006) Innovative central opening strut system for foundation excavation. Journal of Construction Engineering and Management, 132(1), pp. 58-66. ISSN 0733-9364

Yang, R J; Jayasuriya, S; Gunarathna, C; Arashpour, M; Xue, X and Zhang, G (2018) The evolution of stakeholder management practices in Australian mega construction projects. Engineering, Construction and Architectural Management, 25(6), pp. 690-706. ISSN 0969-9988

Yang, S; Cui, G; Abdal Noor, B and Lu, S (2022) Balance between affect and outcome control or face and behaviour control for better learning: Evidence from Chinese engineering project team. International Journal of Construction Management, 22(8), pp. 1432-1442. ISSN 1562-3599

Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364

Yang, X L (2010) Research on general contracter and subcontractor cooperative management in construction. PhD thesis, Harbin Institute of Technology, China.

Yang, Y (2004) Modeling a decision support system for buildable designs. PhD thesis, National University of Singapore, Singapore.

Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(6): 04024048, ISSN 0733-9364

Yao, D (2024) Enhancing cyber risk management in the construction industry. PhD thesis, New York University Tandon School of Engineering, USA.

Yao, H (2009) A dynamic approach for evaluating the sustainability performance of infrastructure projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yao, Y P; Ruan, Y Z; Chen, J; Geng, Y; Zhang, X; Liu, B Y; Zong, X P and Yu, G Z (2018) Research on a real-time monitoring platform for compaction of high embankment in airport engineering. Journal of Construction Engineering and Management, 144(1): 04017096, ISSN 0733-9364

Yao, Z; Zhang, L; Hua, Z and Luo, C (2025) Low-carbon multiobjective optimization for repetitive projects based on crew-based scheduling strategy. Journal of Construction Engineering and Management, 151(1): 04024183, ISSN 0733-9364

Yap, J B H and Cheah, S Y (2020) Key challenges faced by Chinese contractors in Malaysian construction industry: Empirical study. Journal of Engineering, Design and Technology, 18(3), pp. 705-726. ISSN 1726-0531

Yap, J B H and Chow, I N (2020) Investigating the managerial "nuts and bolts" for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 331-348. ISSN 2044-124X

Yap, J B H; Lee, K Y and Skitmore, M (2020) Analysing the causes of corruption in the Malaysian construction industry. Journal of Engineering, Design and Technology, 18(6), pp. 1823-1847. ISSN 1726-0531

Yap, J B H; Leong, W J and Skitmore, M (2020) Capitalising teamwork for enhancing project delivery and management in construction: Empirical study in Malaysia. Engineering, Construction and Architectural Management, 27(7), pp. 1479-1503. ISSN 0969-9988

Yap, J B H; Rou Chong, J; Skitmore, M and Lee, W P (2020) Rework causation that undermines safety performance during production in construction. Journal of Construction Engineering and Management, 146(9): 04020106, ISSN 0733-9364

Yap, J B H and Shavarebi, K (2022) Enhancing project delivery performances in construction through experiential learning and personal constructs: Competency development. International Journal of Construction Management, 22(3), pp. 436-452. ISSN 1562-3599

Yasamis, F (1999) Contractor quality performance (CQP) evaluation model in pavement projects. PhD thesis, Illinois Institute of Technology, USA.

Yasamis, F; Arditi, D and Mohammadi, J (2002) Assessing contractor quality performance. Construction Management and Economics, 20(3), pp. 211-223. ISSN 01446193

Yasamis-Speroni, F; Lee, D E and Arditi, D (2012) Evaluating the quality performance of pavement contractors. Journal of Construction Engineering and Management, 138(10), pp. 1114-1124. ISSN 0733-9364

Yasin, F and Egbu, C (2010) Exploitation of knowledge mapping benefits in the facilities performance evaluation process: A conceptual framework. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Yates, J K and Battersby, L C (2003) Master builder project delivery system and designer construction knowledge. Journal of Construction Engineering and Management, 129(6), pp. 635-644. ISSN 0733-9364

Yates, M E B (2017) An extended PMBOK project management model for companies delivering large multidiscipline mining projects. PhD thesis, University of Johannesburg, South Africa.

Yaworsky, R A (1994) Risk planning for large and BOT projects: A holistic framework. PhD thesis, University of British Columbia, Canada.

Yazdani Mehr, S and Wilkinson, S (2018) Technical issues and energy efficient adaptive reuse of heritage listed city halls in Queensland Australia. International Journal of Building Pathology and Adaptation, 36(5), pp. 529-542. ISSN 23984708

Ye, S and Tiong, R L K (2000) NPV-at-risk method in infrastructure project investment evaluation. Journal of Construction Engineering and Management, 126(3), pp. 227-233. ISSN 0733-9364

Ye, S and Tiong, R L K (2004) Public-private partnership for power projects: A case study of Hub power project. Journal of Financial Management of Property and Construction, 9(3), pp. 129-140. ISSN 1366-4387

Ye, Z; Kapogiannis, G; Tang, S; Zhang, Z; Jimenez-Bescos, C and Yang, T (2025) Influence of an integrated value-based asset condition assessment in built asset management. Construction Innovation, 25(2), pp. 248-269. ISSN 1471-4175

Yean, F; Ling, Y and Ang, W T (2013) Using control systems to improve construction project outcomes. Engineering, Construction and Architectural Management, 20(6), pp. 576-588. ISSN 0969-9988

Yean Yng Ling, F (2005) Models for predicting quality of building projects. Engineering, Construction and Architectural Management, 12(1), pp. 6-20. ISSN 0969-9988

Yearsley, W S (2007) How differences in heavy civil project set-up practices impact performance. PhD thesis, Colorado State University, USA.

Yeoh, J K W and Chua, D K H (2017) Optimizing crane selection and location for multistage construction using a four-dimensional set cover approach. Journal of Construction Engineering and Management, 143(8): 04017029, ISSN 0733-9364

Yeomans, S G (2005) ICT-enabled collaborative working methodologies in construction. EngD thesis, Loughborough University, UK.

Yeung, F Y (2007) Developing a partnering performance index (PPI) for construction projects: A fuzzy set theory approach. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yeung, J F Y; Chan, A P C and Chan, D W M (2008) Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(3), pp. 277-301. ISSN 1466433X

Yeung, J F Y; Chan, A P C; Chan, D W M; Chiang, Y H and Yang, H (2013) Developing a benchmarking model for construction projects in Hong Kong. Journal of Construction Engineering and Management, 139(6), pp. 705-716. ISSN 0733-9364

Yeung, J F Y; Chan, A P C; Chan, D W M and Li, L K (2007) Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study. Construction Management and Economics, 25(12), pp. 1219-1237. ISSN 1466433X

Yeung, J F Y; Chan, D W M; Chan, J H L and Lok, K L (2023) Development of a composite project performance index for the New Engineering Contract (necppi) of construction projects in Hong Kong: A Delphi study. International Journal of Construction Management, 23(16), pp. 2804-2817. ISSN 1562-3599

Yin, H (2026) Construction project information system management framework strategy based on version control and collaboration. International Journal of Construction Management, 26(6), pp. 1033-1058. ISSN 1562-3599

Ying, J F; Tookey, J and Roberti, J (2015) SCM competencies in construction: Issues and challenges in New Zealand. Journal of Engineering, Design and Technology, 13(4), pp. 522-538.

Ying, W; Dai, X and Shen, W (2025) Rapid project delivery through bricolage and planning: A case study of the huoshenshan hospital project. Journal of Construction Engineering and Management, 151(8): 05025003, ISSN 0733-9364

Yip, R C P (2009) The cultural shift of the construction industry of Hong Kong under the influence of sustainable development. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yobouet, Nguessan Thostao (2025) Exploring transformational leadership's role in shaping project teams' motivation and success: A systematic review. PhD thesis, Capitol Technology University, USA.

Yokouchi, N; Ambe, T; Fujisaki-Sueda-Sakai, M and Ozawa, K (2024) Workplace bullying and harassment in the Japanese construction industry: prevalence and associations with subjective health and work attractiveness. Construction Management and Economics, 42(8), pp. 741-757. ISSN 01446193

Yoo, W; Ozer, H and Ham, Y (2019) System-level approach for identifying main uncertainty sources in pavement construction life-cycle assessment for quantifying environmental impacts. Journal of Construction Engineering and Management, 145(2): 04018137, ISSN 0733-9364

Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.

Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.

Yoon, S; Hastak, M and Lee, J (2018) Suitability of intelligent compaction for asphalt pavement quality control and quality assurance. Journal of Construction Engineering and Management, 144(4): 04018006, ISSN 0733-9364

Young, D D (2024) A qualitative investigation into adverse safety behaviors by non-English speaking construction employees. DBA thesis, National University, USA.

Yousefi, S (2009) Attitude-based strategic and tactical negotiations for conflict resolution in construction. PhD thesis, University of Waterloo, USA.

Youssef, M; Mohamed, M S E and Balah, A A S (2024) Fuzzy model for Libyan construction projects delivery system selection. International Journal of Construction Management, 24(6), pp. 643-650. ISSN 1562-3599

Yu, A T W; Shen, Q; Kelly, J and Hunter, K (2006) Investigation of critical success factors in construction project briefing by way of content analysis. Journal of Construction Engineering and Management, 132(11), pp. 1178-1186. ISSN 0733-9364

Yu, H (2009) A knowledge based system for construction health and safety competence assessment. PhD thesis, University of Wolverhampton, UK.

Yu, H; Peng, Z; He, Z and Huang, C (2024) Application maturity evaluation of building steel structure welding robotic technology based on multi-level gray theory. Engineering, Construction and Architectural Management, 31(11), pp. 4372-4397. ISSN 0969-9988

Yu, H; Tweed, T; Al-Hussein, M and Nasseri, R (2009) Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management, 135(8), pp. 782-790. ISSN 0733-9364

Yu, J and Leung, M Y (2018) Structural stakeholder model in public engagement for construction development projects. Journal of Construction Engineering and Management, 144(6): 04018046, ISSN 0733-9364

Yu, J; Ma, G and Cai, S (2019) Disparities in the provision of aging-friendly communities in old and new urban neighborhoods in China. Engineering, Construction and Architectural Management, 26(7), pp. 1277-1293. ISSN 0969-9988

Yu, K Q (2002) Computer integrated construction based on total project systems framework. PhD thesis, University of British Columbia, Canada.

Yu, R K T and Leung, M Y (2001) Investigation of construction conflict resolution in Hong Kong. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Yu, T W (2007) A value management framework for systematic identification and precise representation of client requirements in the briefing process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yu, W-d (1996) A neuro-fuzzy knowledge-based multi-criterion decision model for constructability analysis and improvement of construction technologies. PhD thesis, Purdue University, USA.

Yuan, C; McClure, T; Cai, H and Dunston, P S (2017) Life-cycle approach to collecting, managing, and sharing transportation infrastructure asset data. Journal of Construction Engineering and Management, 143(6): 04017001, ISSN 0733-9364

Yuan, J; Li, X; Ke, Y; Xu, W; Xu, Z and Skibniewski, M (2020) Developing a building information modeling-based performance management system for public-private partnerships. Engineering, Construction and Architectural Management, 27(8), pp. 1727-1762. ISSN 0969-9988

Yuan, J; Zeng, A Y; Skibniewski, M J and Li, Q (2009) Selection of performance objectives and key performance indicators in public-private partnership projects to achieve value for money. Construction Management and Economics, 27(3), pp. 253-270. ISSN 1466433X

Yuan, Mei (2011) An integrated knowledge management framework for managing sustainability knowledge in the Australian infrastructure sector. PhD thesis, Queensland University of Technology, Australia.

Yun, G Y; Steemers, K and Baker, N (2008) Natural ventilation in practice: Linking facade design, thermal performance, occupant perception and control. Building Research & Information, 36(6), pp. 608-624. ISSN 0961-3218

Yunpeng, G and Zaman, U (2024) Exploring mega-construction project success in China's vaunted belt and road initiative: The role of paternalistic leadership, team members' voice and team resilience. Engineering, Construction and Architectural Management, 31(9), pp. 3801-3825. ISSN 0969-9988

Yunus, R and Yang, J (2014) Improving ecological performance of industrialized building systems in Malaysia. Construction Management and Economics, 32(1-2), pp. 183-195. ISSN 01446193

Yusof, N A; Ishak, S S M and Doheim, R (2018) Identifying factors for incorporating spatial data into BIM using the Delphi method. Construction Economics and Building, 18(3), pp. 1-17. ISSN 2204-9029

Yusuf, A O; Opawole, A; Musa, N A; Kadiri, D S and Ebunoluwa, E I (2024) Factors influencing the organisational capabilities of the public sector for implementation of building information modelling in construction projects. International Journal of Building Pathology and Adaptation, 42(5), pp. 1058-1083. ISSN 2398-4708

Yılmaz, M B and Rızvanoğlu, K (2022) Understanding users' behavioral intention to use voice assistants on smartphones through the integrated model of user satisfaction and technology acceptance: A survey approach. Journal of Engineering, Design and Technology, 20(6), pp. 1738-1764. ISSN 1726-0531

Zaalouk, A; Altaf, M S and Han, S (2025) Operations-oriented supply chain master planning in panelized construction using hybrid multiagent simulation. Journal of Construction Engineering and Management, 151(10): 04025206, ISSN 0733-9364

Zaayman, L (2017) Optimisation of mechanised maintenance management of railway track infrastructure. PhD thesis, University of Johannesburg, South Africa.

Zadok, Y (2020) Project-based learning in robotics meets junior high school. Journal of Engineering, Design and Technology, 18(5), pp. 941-958. ISSN 1726-0531

Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Zafar, J and Chileshe, N (2018) Analysis of health and well-being practices among older construction site-based workers in South Australia. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Zaher, M; Greenwood, D and Marzouk, M (2018) Mobile augmented reality applications for construction projects. Construction Innovation, 18(2), pp. 152-166. ISSN 1471-4175

Zaid Alkilani, Suhair (2018) Performance measurement and improvement model for small and medium contractors in developing countries. PhD thesis, University of New South Wales, Australia.

Zailani, B M; Ibrahim, Y M; Abdullahi, M; Dania, A and Abubakar, M (2023) Constructing the team: A personality-based perspective to team absorptive capacity. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Zainal Abidin, N A (2018) Resilience of Malaysian public sector construction industry to supply chain disruptions. PhD thesis, University of Huddersfield, UK.

Zainul Abidin, N and Powmya, A (2025) Identifying barriers in constructing green buildings in Oman: A study on project contractors' experience. Built Environment Project and Asset Management, 15(1), pp. 67-84. ISSN 2044-124X

Zamalik, M N and Nawi, M N M (2024) Managing soil and geotechnical aspects in housing developments: Analysis of case studies. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Zaman, U (2020) Examining the effect of xenophobia on "transnational" mega construction project (MCP) success: Moderating role of transformational leadership and high-performance work (HPW) practices. Engineering, Construction and Architectural Management, 27(5), pp. 1119-1143. ISSN 0969-9988

Zaman, U; Florez-Perez, L; Anjam, M; Ghani Khwaja, M and Ul-Huda, N (2023) At the end of the world, turn left: Examining toxic leadership, team silence and success in mega construction projects. Engineering, Construction and Architectural Management, 30(6), pp. 2436-2462. ISSN 0969-9988

Zangeneh, P (2021) Knowledge representation and artificial intelligence for management of socio-technical risks in megaprojects. PhD thesis, University of Toronto, Canada.

Zarghami, S A (2024) Measuring sensitivity to change orders in construction projects using eigenvector centrality and radius of gyration. Engineering, Construction and Architectural Management, 31(6), pp. 2478-2495. ISSN 0969-9988

Zarghami, S A and Zwikael, O (2024) Buffer allocation in construction projects: a disruption mitigation approach. Engineering, Construction and Architectural Management, 31(10), pp. 3946-3972. ISSN 0969-9988

Zarkada, A (1998) Tendering ethics: A study of collusive tendering from a marketing perspective. PhD thesis, Queensland University of Technology, Australia.

Zemke, D M V and Pullman, M (2008) Assessing the value of good design in hotels. Building Research & Information, 36(6), pp. 543-556. ISSN 0961-3218

Zeng, N; Liu, Y and König, M (2023) 4D BIM-enabled look-ahead scheduling for early warning of off-site supply chain disruptions. Journal of Construction Engineering and Management, 149(1): 04022154, ISSN 0733-9364

Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X

Zeni, K S and Kikwasi, G J (2023) Factors affecting maintenance cost of public buildings: Case study of Tanzania buildings agency and national housing corporation. International Journal of Building Pathology and Adaptation, 41(5), pp. 926-941. ISSN 23984708

Zhan, W; Pan, W and Chen, L (2021) Construction project productivity evaluation framework with expanded system boundaries. Engineering, Construction and Architectural Management, 28(4), pp. 863-885. ISSN 0969-9988

Zhan, W; Pan, W and Hao, G (2022) Productivity measurement and improvement for public construction projects. Journal of Construction Engineering and Management, 148(6): 04022035, ISSN 0733-9364

Zhang, S; Zhang, S; Zhao, Z; Liu, H; Wang, C; Wang, X and Yan, L (2026) BIM and semantic web-based circular design system for sustainable construction management of hydropower engineering. Journal of Construction Engineering and Management, 152(3): 04026002, ISSN 0733-9364

Zhang, D (2015) An analysis of building information modelling (BIM) implementation from a planned behavior perspective. PhD thesis, University of Hong Kong, Hong Kong.

Zhang, F; Liu, H; Chen, Z; Wang, L; Zhang, Q and Guo, L (2024) Collision risk warning model for construction vehicles based on YOLO and DeepSORT algorithms. Journal of Construction Engineering and Management, 150(6): 04024053, ISSN 0733-9364

Zhang, Guomin (2005) Factors influencing the implementation of raised floor system for the fitout of office buildings in the Australian context. PhD thesis, Queensland University of Technology, Australia.

Zhang, H M; Chong, H Y; Zeng, Y and Zhang, W (2023) The effective mediating role of stakeholder management in the relationship between BIM implementation and project performance. Engineering, Construction and Architectural Management, 30(6), pp. 2503-2522. ISSN 0969-9988

Zhang, H and Alhashedi, E (2025) Propagation analysis and assessment for the risks in EPC projects. Journal of Construction Engineering and Management, 151(12): 04025209, ISSN 0733-9364

Zhang, J; Chen, F and Yuan, X X (2020) Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: A Canadian study. Construction Management and Economics, 38(8), pp. 739-755. ISSN 01446193

Zhang, J; Li, H; Golizadeh, H; Zhao, C; Lyu, S and Jin, R (2020) Reliability evaluation index for the integrated supply chain utilising BIM and lean approaches. Engineering, Construction and Architectural Management, 27(5), pp. 997-1038. ISSN 0969-9988

Zhang, J; Xie, H and Li, H (2019) Improvement of students problem-solving skills through project execution planning in civil engineering and construction management education. Engineering, Construction and Architectural Management, 26(7), pp. 1437-1454. ISSN 0969-9988

Zhang, J and Yuan, X X (2021) Stochastic modelling of maintenance flexibility in value for money assessment of PPP road projects. Construction Management and Economics, 39(2), pp. 173-191. ISSN 01446193

Zhang, L; Dai, G; Zou, X and Qi, J (2020) Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Engineering, Construction and Architectural Management, 27(10), pp. 3095-3113. ISSN 0969-9988

Zhang, L; Fu, Y and Lu, W (2021) Contract enforcement for claimants' satisfaction with construction dispute resolution: Moderating role of shadow of the future, fairness perception, and trust. Journal of Construction Engineering and Management, 147(2): 04020168, ISSN 0733-9364

Zhang, L; He, J and Zhou, S (2013) Sharing tacit knowledge for integrated project team flexibility: Case study of integrated project delivery. Journal of Construction Engineering and Management, 139(7), pp. 795-804. ISSN 0733-9364

Zhang, N (2001) A computer-based environment for preliminary structural design, design collaboration and design automation of tall buildings. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Zhang, P (2011) Analysis of factors affecting individual knowledge sharing behavior inconstruction teams in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Zhang, P and Ng, F F (2012) Analysis of knowledge sharing behaviour in construction teams in Hong Kong. Construction Management and Economics, 30(7), pp. 557-574. ISSN 1466433X

Zhang, P and Ng, F F (2013) Explaining knowledge-sharing intention in construction teams in Hong Kong. Journal of Construction Engineering and Management, 139(3), pp. 280-293. ISSN 0733-9364

Zhang, P; Sing, M C P; Guo, S; Chan, I Y S and Fung, I W H (2025) Causal factors of near misses and accidents in urban railway construction: A complex network approach. Journal of Construction Engineering and Management, 151(7): 04025081, ISSN 0733-9364

Zhang, Q W; Chong, H Y; Liao, P C and Wan, Y L (2020) Logistic regression modeling of implementation of corporate safety policy in international infrastructures. Engineering, Construction and Architectural Management, 27(10), pp. 3031-3050. ISSN 0969-9988

Zhang, S (2019) Developing commercial capabilities for infrastructure delivery: A dynamic capabilities view. PhD thesis, University of Hong Kong, Hong Kong.

Zhang, S; Jiang, P; Zhang, Z and Wang, C (2021) Webgis-based collaborative construction quality control of rcc gravity dam using sensing devices. Journal of Construction Engineering and Management, 147(3): 06020004, ISSN 0733-9364

Zhang, T (2019) Investigating the effectiveness of BIM-bms integration on managing existing building facilities: A New Zealand educational building case. PhD thesis, Auckland University of Technology, New Zealand.

Zhang, X (2006) Factor analysis of public clients' best-value objective in public-privately partnered infrastructure projects. Journal of Construction Engineering and Management, 132(9), pp. 956-965. ISSN 0733-9364

Zhang, X (2019) Integrating lean construction, BIM and quality: a new paradigm for the improvement of Chinese construction quality. PhD thesis, University of Bath, UK.

Zhang, X; Azhar, S; Nadeem, A and Khalfan, M (2018) Using building information modelling to achieve lean principles by improving efficiency of work teams. International Journal of Construction Management, 18(4), pp. 293-300. ISSN 1562-3599

Zhang, X; Sexton, M G; Goulding, J S; Aouad, G and Kagioglou, M (2005) Performance modelling for the design of a hybrid concrete structural frame. Architectural Engineering and Design Management, 1(2), pp. 83-91. ISSN 1745-2007

Zhang, X; Shen, L; Xia, B and Skitmore, M (2010) Key competitiveness indicators for new real estate developers. Journal of Financial Management of Property and Construction, 15(2), pp. 143-157. ISSN 1366-4387

Zhang, X; Zhang, Z; Sun, W; Hu, J; Zhang, L and Zhu, W (2025) The mechanical deformation characteristics of the internal structure of large diameter shield tunnel in different construction stages. Engineering, Construction and Architectural Management, 32(4), pp. 2190-2209. ISSN 0969-9988

Zhang, X Q and Kumaraswamy, M M (2001) Hong Kong experience in managing BOT projects. Journal of Construction Engineering and Management, 127(2), pp. 154-162. ISSN 0733-9364

Zhang, Y; Chang, R; Mao, W; Zuo, J; Zhang, W E and Liu, L (2025) Low-cost ios-based automated detection of under-construction interior drywalls: An exploratory study. Journal of Construction Engineering and Management, 151(10): 05025012, ISSN 0733-9364

Zhang, Y; Lei, Z; Han, S; Bouferguene, A and Al-Hussein, M (2020) Process-oriented framework to improve modular and offsite construction manufacturing performance. Journal of Construction Engineering and Management, 146(9): 04020116, ISSN 0733-9364

Zhang, Z (2021) Participatory ergonomics in construction: Enabling practice-to-research-to-practice via the 2safemodel. PhD thesis, University of Washington, USA.

Zhao, G; Wang, M and Zhang, J (2025) Research on the decision-making of neighborhood renewal projects based on low-carbon technology. Engineering, Construction and Architectural Management, 32(12), pp. 8171-8195. ISSN 0969-9988

Zhao, D; Duva, M; Mollaoglu, S; Frank, K; Garcia, A and Tait, J (2021) Integrative collaboration in fragmented project organizations: Network perspective. Journal of Construction Engineering and Management, 147(10): 04021115, ISSN 0733-9364

Zhao, J; Lam, K P; Biswas, T and Wang, H (2015) An online platform to automate LEED energy performance evaluation and submission process. Construction Innovation, 15(3), pp. 313-332. ISSN 1471-4175

Zhao, Y; Jing, H; Yu, M and Li, J (2025) Efficient project management of historical building groups: a BIM-based approach with critical chain method and 5D simulation. International Journal of Construction Management, 25(7), pp. 826-839. ISSN 1562-3599

Zhao, Y; Mourshed, M and Wright, J (2009) Factors influencing the design of spatial layouts in healthcare buildings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Zhao, Z; Wang, X; Ji, Y; Liu, H; Liu, X and Yao, F (2025) Analysis of quality-influencing factors of adopting prefabricated steel structure housings: Based on the ISM-MICMAC model. Journal of Construction Engineering and Management, 151(8): 04025098, ISSN 0733-9364

Zheng, X; Qin, Y; Xue, H; Hu, X and Skitmore, M (2026) How formal control fosters relational behavior for innovation performance in infrastructure megaprojects. Journal of Construction Engineering and Management, 152(3): 04025269, ISSN 0733-9364

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2004) Applying a genetic algorithm-based multiobjective approach for time-cost optimization. Journal of Construction Engineering and Management, 130(2), pp. 168-176. ISSN 0733-9364

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(1), pp. 81-91. ISSN 0733-9364

Zhikun, D; Fungfai, N G and Jiayuan, W (2010) Personal construct based factors affecting willingness to share knowledge between architects in a project design team. International Journal of Construction Management, 10(3), pp. 1-11. ISSN 1562-3599

Zhong, Z and Gou, Z (2023) High-rise apartment quality evaluation and related demographic factors: Lesson from rentsafeto programme. Building Research & Information, 51(4), pp. 430-445. ISSN 0961-3218

Zhou, L; Wang, C; Niu, P; Zhang, H; Zhang, N; Xie, Q; Wang, J; Zhang, X and Liu, J (2025) A morphology-euclidean-linear recognition method for rebar point clouds of highway tunnel linings during the construction phase. Engineering, Construction and Architectural Management, 32(10), pp. 6509-6535. ISSN 0969-9988

Zhou, L (2009) Achieving sustainable development through the private finance initiative procurement process. PhD thesis, Oxford Brookes University, UK.

Zhou, L; Keivani, R and Kurul, E (2013) Sustainability performance measurement framework for PFI projects in the UK. Journal of Financial Management of Property and Construction, 18(3), pp. 232-250. ISSN 1366-4387

Zhou, Q and Deng, X (2025) A configuration analysis on knowledge transfer between projects: From horizontal and vertical perspectives. Engineering, Construction and Architectural Management, 32(5), pp. 3349-3374. ISSN 0969-9988

Zhou, Q; Deng, X; Hwang, B G; Mahmoudi, A and Liu, Y (2023) Integrating the factors affecting knowledge transfer within international construction projects: Individual and team perspectives. Journal of Construction Engineering and Management, 149(11): 04023117, ISSN 0733-9364

Zhou, S; Mosca, L and Whyte, J (2023) How the reliability of external competences shapes the modularization strategies of industrialized construction firms. Construction Management and Economics, 41(7), pp. 608-619. ISSN 01446193

Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.

Zhou, Y; Wang, X; Gosling, J and Naim, M M (2023) The system dynamics of engineer-to-order construction projects: Past, present, and future. Journal of Construction Engineering and Management, 149(5): 03123004, ISSN 0733-9364

Zhu, L; Cheung, S O; Gao, X; Li, Q and Liu, G (2020) Success DNA of a record-breaking megaproject. Journal of Construction Engineering and Management, 146(8): 05020009, ISSN 0733-9364

Zhu, L; Zhu, Q and Zhao, X (2024) Identifying determinants of student learning effects in intensive online environments: An empirical investigation in civil engineering education. International Journal of Construction Management, 24(11), pp. 1249-1258. ISSN 1562-3599

Zhu, X (2023) Machine learning supported multiple criteria decision making for project delivery system selection. PhD thesis, Queen's University Belfast, UK.

Zighan, S and Abualqumboz, M (2021) A project life-cycle readiness approach to manage construction waste in Jordan. Construction Economics and Building, 21(3), pp. 58-79. ISSN 2204-9029

Zimina, D; Ballard, G and Pasquire, C (2012) Target value design: Using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(5), pp. 383-398. ISSN 1466433X

Zoleykani, M. J. and Abbasianjahromi, H. (2026) Integrating ar and 4D-BIM for dynamic hazard management in construction projects. International Journal of Construction Management, 26(7), pp. 1239-1263. ISSN 1562-3599

Zoleykani, M J; Abbasianjahromi, H; Banihashemi, S; Tabadkani, S A and Hajirasouli, A (2024) Extended reality (XR) technologies in the construction safety: Systematic review and analysis. Construction Innovation, 24(4), pp. 1137-1164. ISSN 1471-4175

Zou, J and Zillante, G (2006) Relationship contracting: The South Australian experience: a case study. Construction Economics and Building, 6(2), pp. 20-31. ISSN 2204-9029

Zou, J; Zillante, G and Coffey, V (2009) Project culture in the Chinese construction industry: Perceptions of contractors. Construction Economics and Building, 9(2), pp. 17-28. ISSN 2204-9029

Zou, P X W; Redman, S and Windon, S (2008) Case studies on risk and opportunity at design stage of building projects in australia: Focus on safety. Architectural Engineering and Design Management, 4(3-4), pp. 221-238. ISSN 1745-2007

Zou, Y (2017) BIM and knowledge based risk management system. PhD thesis, University of Liverpool, UK.

Zou, Y (2017) Building information modelling and knowledge-based risk management system. PhD thesis, University of Liverpool, UK.

Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.

Zouein, P P and Tommelein, I D (1999) Dynamic layout planning using a hybrid incremental solution method. Journal of Construction Engineering and Management, 125(6), pp. 400-408. ISSN 0733-9364

Zubair, M U; Zhang, X and Hassan, M U (2024) Aligning expectations and perceptions of elevator maintenance stakeholders: An application of expectation confirmation theory. Building Research & Information, 52(4), pp. 418-430. ISSN 0961-3218

Zughaibi, A M (1987) Construction productivity in Saudi Arabia: The influence of multinational labor force. PhD thesis, University of Texas at Austin, USA.

Zuniga-Garcia, N; Machemehl, R B; Khwaja, N A; Pruner, K D and Fu, M (2021) Estimation of road user costs for work zones in data-limited or time-constrained environments. Journal of Construction Engineering and Management, 147(3): 04020182, ISSN 0733-9364

Zuppa, D (2009) Model for developing trust in construction management. PhD thesis, University of Florida, USA.

Zwick, D C and Miller, K R (2004) Project buyout. Journal of Construction Engineering and Management, 130(2), pp. 245-248. ISSN 0733-9364

af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

af Hällström, A; Bosch-Sijtsema, P and Poblete, L (2025) Challenges with collaboration: The interaction of formal and informal ties in infrastructure construction. Construction Management and Economics, 43(1), pp. 7-25. ISSN 0144-6193

af Hällström, A; Bosch-Sijtsema, P; Poblete, L; Rempling, R and Karlsson, M (2021) The role of social ties in collaborative project networks: A tale of two construction cases. Construction Management and Economics, 39(9), pp. 723-738. ISSN 01446193

al-Attar, H; Sweis, G; Tarawneh, B; Abu-Khader, W; Haddad, L and Sweis, R (2025) Enhanced construction project duration estimation using artificial neural networks: Initial design and planning stages. Construction Economics and Building, 25(2), pp. 168-191. ISSN 2204-9029

da Silva, M B C; Moschen, S D A; Cecatto, B and Larentis, F (2022) Perceived attributes and dimensions of accessibility in adapted bathrooms. Building Research & Information, 50(1-2), pp. 60-73. ISSN 0961-3218

de Blois, M and De Coninck, P (2008) The dynamics of actors' and stakeholders' participation: An approach of management by design. Architectural Engineering and Design Management, 4(3-4), pp. 176-188. ISSN 1745-2007

de Laat, P (2019) Resource depletion: Where is an intervention most effective? Smart and Sustainable Built Environment, 8(4), pp. 307-321. ISSN 2046-6099

de Melo, R S S; Do, D; Tillmann, P; Ballard, G and Granja, A D (2016) Target value design in the public sector: Evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp. 125-137. ISSN 1745-2007

de Pinho Matos, Raquel Valente (2024) Building condition assessment applied to public buildings. PhD thesis, Universidade de Aveiro, Portugal.

dos Santos, A (1999) Application of flow principles in the production management of construction sites. PhD thesis, University of Salford, UK.

e Silva, H B G (2024) Mitigating information asymmetry in the 5g era: Unveiling practices that restrict users' internet access. PhD thesis, Universidade do Porto, Portugal.

fu, C; Kaya, S and Aouad, M K G (2007) The development of an IFC-based lifecycle costing prototype tool for building construction and maintenance: Integrating lifecycle costing to nD modelling. Construction Innovation, 7(1), pp. 85-98. ISSN 1471-4175

ke, Y; Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(1), pp. 6-25. ISSN 1366-4387

ng, S T (2005) Performance of engineering consultants in ISO 9000-based quality management systems implementation. Engineering, Construction and Architectural Management, 12(6), pp. 519-532. ISSN 0969-9988

olde Scholtenhuis, L L; Dorée, A G and Hartmann, T (2011) Challenges for construction it adoption on project level. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

van Heerden, A.; Flemmer, C.; Boulic, M. and McDonald, B. W. (2026) The effect of job status on stressors and stress coping strategies in the New Zealand construction sector. International Journal of Construction Education and Research, 22(2), pp. 211-232. ISSN 1557-8771

van Niekerk, J; Wium, J and de Koker, N (2022) The value of data from construction project site meeting minutes in predicting project duration. Built Environment Project and Asset Management, 12(5), pp. 738-753. ISSN 2044-124X

van Uden, M; Wamelink, H; van Bueren, E and Heurkens, E (2025) Aligning practices towards a circular economy in the architecture, engineering, and construction sector: Seven transitions in different stages of reconfiguration. Construction Management and Economics, 43(2), pp. 153-174. ISSN 0144-6193

van der Ham, M and Opdenakker, R (2023) Overcoming process-related barriers in modular high-rise building projects. International Journal of Construction Management, 23(10), pp. 1779-1789. ISSN 1562-3599

Çankaya Topak, S (2024) Conforming to future changes in buildings: A component-oriented detailing strategy. PhD thesis, Middle East Technical University, Turkey.

Özer, S and Jacoby, S (2024) Space standards in affordable housing in England. Building Research & Information, 52(6), pp. 611-626. ISSN 0961-3218

Şentop Dümen, A and Tamer Bayazıt, N (2020) Enforcement of acoustic performance assessment in residential buildings and occupant satisfaction. Building Research & Information, 48(8), pp. 866-885. ISSN 0961-3218

This list was generated on Sat Aug 22 02:37:38 2026 UTC.