Items with Subject: project completion
Abadi, M and Sammuneh, M A (2020) Integrating circular economy and constructability research: An initial development of a lifecycle "circularity" assessment framework and indicators. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Abdelalim, A M; Salem, M; Al-Sabah, R; Said, S O; ElShafei, H M and Galal Badawy, M (2025) Optimizing claim management process groups to enhance construction project success. International Journal of Construction Management, 25(13), pp. 1583-1595. ISSN 1562-3599
Abdul Nabi, M and El-Adaway, I H (2021) Risk-based approach to predict the cost performance of modularization in construction projects. Journal of Construction Engineering and Management, 147(10): 04021133, ISSN 0733-9364
Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.
Abolghasemi, M.; Al-Mhdawi, M. K. S.; Rahimian, F. and Qazi, A. (2026) Exploring the nexus of stakeholder management, project performance and stakeholder satisfaction in Malaysian residential building projects: A PLS-SEM approach. Engineering, Construction and Architectural Management, 33(3), pp. 2089-2117. ISSN 0969-9988
Abu Arqoub, Muath (2022) Measuring end-user delight: Is success in project design and delivery enough? PhD thesis, Bond University, Australia.
Aburas, M (2020) Critical success factors for implementing ISO 9001 in UK construction projects. PhD thesis, University of Salford, UK.
Acheamfour, V K; Kissi, E and Adjei-Kumi, T (2019) Ascertaining the impact of contractors pre-qualification criteria on project success criteria. Engineering, Construction and Architectural Management, 26(4), pp. 618-632. ISSN 0969-9988
Adebisi, E O; Alao, O O and Ojo, S O (2020) Assessment of early warning signs predisposing building projects to failure in Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1403-1423. ISSN 1726-0531
Adebisi, E O; Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(2), pp. 210-231. ISSN 23984708
Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2025) An analytical approach to understanding construction cost overruns during COVID-19. Smart and Sustainable Built Environment, 14(6), pp. 1780-1794. ISSN 2046-6099
Adia, I (2019) Strategies to secure sustainable funding for the successful conclusion of infrastructure projects. PhD thesis, Walden University, USA.
Adukpo, S E and Leiringer, R (2016) Client project governance capabilities: Unpacking the concept and governance mechanisms in practice. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Afzal, F; Yunfei, S; Sajid, M and Afzal, F (2020) Integrated priority decision index for risk assessment in chaos: Cost overruns in transport projects. Engineering, Construction and Architectural Management, 27(4), pp. 825-849. ISSN 0969-9988
Afzal, Muneeb (2024) Improving request for information (RFI) processing in construction projects using natural language processing (NLP) techniques. PhD thesis, University of Technology Sydney, Australia.
Agbaxode, P D K; Saghatforoush, E; Dlamini, S and Korsah, J K (2024) Integrated project delivery enablers to enhance conventional project delivery toward improving design documentation quality. Built Environment Project and Asset Management, 14(6), pp. 817-834. ISSN 2044-124X
Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects. PhD thesis, Northumbria University, UK.
Aggor, K K (2017) Relationship between budget and project success factors in the Ghanaian building construction sector. PhD thesis, Walden University, USA.
Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.
Ahmad, T and Aibinu, A A (2017) Project delivery attributes influencing green building project outcomes: A review and future research directions. Built Environment Project and Asset Management, 7(5), pp. 471-489. ISSN 2044-124X
Ahmad, Tayyab (2020) An inquiry of conditions and criteria associated with Green Building project success. PhD thesis, University of Melbourne, Australia.
Ahmed, K; Leung, M Y and Ojo, L D (2022) An exploratory study to identify key stressors of ethnic minority workers in the construction industry. Journal of Construction Engineering and Management, 148(5): 04022014, ISSN 0733-9364
Ahmed, S (2022) Risk management framework an analysis of risk management process in SMEs of the UK construction industry. PhD thesis, University of the West of Scotland, UK.
Ahuja, R; Sawhney, A and Arif, M (2018) Developing organizational capabilities to deliver lean and green project outcomes using BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1255-1276. ISSN 0969-9988
Ahuja, S; Nikolova, N and Clegg, S (2020) Professional identity and anxiety in architect-client interactions. Construction Management and Economics, 38(7), pp. 589-602. ISSN 01446193
Ainoo, F N Y (2025) Leveraging big data in AEC decision-making: A governance framework. PhD thesis, Capella University, USA.
Ajelabi, I K (2013) Product based project portfolio and information sharing. PhD thesis, University of Reading, UK.
Akade, S A (2017) Understanding the impact of culture on project execution in a developing country: an action research study of six international oil and gas companies in Nigeria. PhD thesis, University of Liverpool, UK.
Akinladenu, Kafilat (2025) Exploring the relationship between project managers' technical competence and project success. DBA thesis, Wilmington University (Delaware), USA.
Akter, J; Datta, S D; Islam, M; Tayeh, B A; Sraboni, S A and Das, N (2025) Assessment and analysis of the effects of implementing building information modelling as a lean management tool in construction management. International Journal of Building Pathology and Adaptation, 43(4), pp. 877-894. ISSN 2398-4708
Al Nahyan, M T; Sohal, A S; Fildes, B N and Hawas, Y E (2012) Transportation infrastructure development in the UAE: Stakeholder perspectives on management practice. Construction Innovation, 12(4), pp. 492-514. ISSN 1471-4175
Al Nahyan, Moza Tahnoon (2012) Management of mega infrastructure projects in the United Arab Emirates. PhD thesis, Monash University, Australia.
Al-Adwani, M (2021) Development of a BIM and lean construction process protocol for the construction industry in Kuwait: From a client perspective. PhD thesis, University of Salford, UK.
Al-Adwani, M M H M A (2021) Development of a BIM and LEAN construction process protocol for the construction industry in Kuwait, from a client perspective. PhD thesis, University of Salford, UK.
Al-Balushi, R A; Fortune, C and Kaka, A (2005) The implementation of corporate strategies through the use of an enterprise project management model (epmm): The case of telecommunication operator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Al-Balushi, R A; Kaka, A and Fortune, C (2004) Project management processes and the achievement of organizational strategies: The case of telecomm. Operator. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.
Al-Hinai, A (2024) A hermeneutical approach to social value: A case study of national infrastructure planning in Oman. PhD thesis, University of Manchester, UK.
Al-Keim, A (2017) Strategies to reduce cost overruns and schedule delays in construction projects. PhD thesis, Walden University, USA.
Al-Turfi, S (2017) Best practice project management for the sustainable regeneration of Holy Karbala Province in Iraq. PhD thesis, University of Bolton, UK.
AlHarmoodi, S M and Dulaimi, M (2022) The alignment of the open innovation process and the project lifecycle. Built Environment Project and Asset Management, 12(4), pp. 556-572. ISSN 2044-124X
Alameri, H (2018) A resource-based perspective of project success in public sector projects in Abu Dhabi. PhD thesis, Bournemouth University, UK.
Alaqad, M (2021) Critical success factors for integration of value, financial risk, and environmental management systems in medium sized design and build projects. PhD thesis, University of Brighton, UK.
Alaqad, M; Gidado, K and Piroozfar, P (2015) Integrating value, risk and environmental management at the strategic definition stage. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Aldhanhani, M A A (2018) Enablers and barriers to knowledge sharing in the UAE infrastructural projects. PhD thesis, British University in Dubai, UAE.
Algraiw, I H A (2015) The engagement of expert opinions in the modeling of multi-attribute decision making for the selection of project delivery methods in building construction. PhD thesis, Missouri University of Science and Technology, USA.
Alhamami, A (2021) Standardized qualification framework for achieving energy efficiency training for BIM. PhD thesis, Cardiff University, UK.
Ali, A H and Kineber, A F (2025) Unveiling and modelling the impact of safety drivers on the overall success of construction projects in developing countries. International Journal of Construction Management, 25(11), pp. 1357-1379. ISSN 1562-3599
Aliu, J; Oke, A E and Oni, S B (2024) Evaluating strategies to promote mechatronics deployment in AECO projects: A Nigerian construction practitioners' perspectives. International Journal of Construction Management, 24(14), pp. 1540-1549. ISSN 1562-3599
Aliu, J; Agbaje, D H; Oke, A E and Ebekozien, A (2025) Driving forces behind the adoption of IEQ principles in building design: Evidence from Nigerian quantity surveying firms. International Journal of Building Pathology and Adaptation, 43(6), pp. 1541-1558. ISSN 2398-4708
Alkilani, S and Loosemore, M (2022) Project performance measurement for small-and-medium sized construction contractors in the Jordanian construction industry. Construction Management and Economics, 40(10), pp. 743-769. ISSN 01446193
Almalki, T S (2015) A study of the influence of trust on the relationships between team members in engineering projects. PhD thesis, University of Dundee, UK.
Alotaibi, A B (2019) Project management: the implication of project management practices on project success in Saudi Arabia. PhD thesis, University of Portsmouth, UK.
Alsabban, A (2019) A study on analysing mega-project failures in Saudi Arabia by using agency theory. PhD thesis, University of Birmingham, UK.
Alshboul, O. and Shehadeh, A. (2026) Enhancing infrastructure project outcomes through optimized contractual structures and long-term warranties. Engineering, Construction and Architectural Management, 33(3), pp. 2220-2242. ISSN 0969-9988
Alshihre, F; Chinyio, E; Nzekwe-Excel, C and Daniel, E I (2020) Improving clients' satisfaction in construction projects: The case of Saudi Arabia. Built Environment Project and Asset Management, 10(5), pp. 709-723. ISSN 2044-124X
Alsohiman, N K (2017) Modelling variation for improving the management of construction engineering project outcomes in the Kingdom of Saudi Arabia. PhD thesis, University of Liverpool, UK.
Alsubaey, M H (2017) A hybrid machine learning and text-mining approach for the automated generation of early warnings in construction project management. PhD thesis, Cranfield University, UK.
Alsuliman, J; Bowles, G and Chen, Z (2012) Current practice of variation order management in the Saudi construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Alvand, A; Mirhosseini, S M; Ehsanifar, M; Zeighami, E and Mohammadi, A (2023) Identification and assessment of risk in construction projects using the integrated FMEA-swara-waspas model under fuzzy environment: A case study of a construction project in Iran. International Journal of Construction Management, 23(3), pp. 392-404. ISSN 1562-3599
Alzahrani, Sami Salem (2015) Developing a project management maturity model to initiate sustainable project performance and modernisation in the Kingdom of Saudi Arabia. PhD thesis, University of Adelaide, Australia.
Alzeraa, A (2018) Impact of project communications effectiveness on construction disputes. PhD thesis, Wayne State University, USA.
Amies, P; Jin, X and Senaratne, S (2025) Identification of success criteria over life cycle of dam industry projects: A Delphi study. Construction Innovation, 25(3), pp. 689-709. ISSN 1471-4175
Amies, P; Jin, X and Senaratne, S (2025) Success in construction management of dams: An empirical study. International Journal of Construction Management, 25(10), pp. 1207-1217. ISSN 1562-3599
Amin, K F and Abanda, F H (2019) Building information modelling plan of work for managing construction projects in Egypt. Journal of Construction in Developing Countries, 24(2), pp. 23-61. ISSN 1823-6499
Amoah, C and Nkosazana, H (2022) Effective management strategies for construction contract disputes. International Journal of Building Pathology and Adaptation, 41(6), pp. 70-84. ISSN 23984708
Amoah, C and Pretorius, L (2020) Evaluation of the impact of risk management on project performance in small construction firms in South Africa: The case study of construction systems. Journal of Engineering, Design and Technology, 18(3), pp. 611-634. ISSN 1726-0531
Amponsah, Richard (2011) Improving project management practice in Ghana with focus on agriculture, banking and construction sectors of the Ghanaian economy. PhD thesis, RMIT University, Australia.
Anakor, C A; Harper, C M and Taylor, T R B (2026) Training and job search preferences among male and female craft workers in US construction. Journal of Construction Engineering and Management, 152(3): 04025267, ISSN 0733-9364
Anbar, D R; Chang, T; Ullah, S; Alqershy, M T; Mousa, K and Deng, X (2026) The role of interpersonal distrust as a mediator of the relationship between ethnic minorities and knowledge hiding in international construction projects. Engineering, Construction and Architectural Management, 33(1), pp. 832-855. ISSN 0969-9988
Anbar, D. R.; Deng, X.; Taha Alqershy, M. and Ullah, S. (2026) Unveiling interpersonal distrust as a mediator between contingent employees and knowledge hiding in international construction projects in the gulf region. International Journal of Construction Management, 26(7), pp. 1390-1405. ISSN 1562-3599
Anbar, D R; Chang, T; Deng, X and Mahmoud, M R I (2024) Implementing effective knowledge management in international construction projects by eliminating knowledge hiding. Journal of Construction Engineering and Management, 150(8): 04024082, ISSN 0733-9364
Ankrah, N A (2007) An investigation into the impact of culture on construction project performance. PhD thesis, University of Wolverhampton, UK.
Ankrah, N A; Proverbs, D G and Ahadzie, D K (2008) Exploring the behaviours of construction project participants through social cognitive theory. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Anthony, R; K. S, A; Prasanna, K and Sawhney, A (2025) An exploratory study on the application of digital twins in the Indian construction industry. International Journal of Construction Management, 25(9), pp. 996-1007. ISSN 1562-3599
Antoniadis, D (2009) Managing complexity in project teams. PhD thesis, Loughborough University, UK.
Apostolopoulos, C (2015) Risk assessment for change management within project management: a hierarchical model process approach. PhD thesis, City, University of London, UK.
Arabi, S; Eshtehardian, E and Shafiei, I (2022) Using Bayesian networks for selecting risk-response strategies in construction projects. Journal of Construction Engineering and Management, 148(8): 04022067, ISSN 0733-9364
Arar, A J; Papineau, C and Poirier, E (2024) An empirical evaluation of the causes leading to binding dispute resolution mechanisms in the quebec construction industry. International Journal of Construction Management, 24(7), pp. 761-770. ISSN 1562-3599
Arimoro, A E (2018) Ensuring a healthy legal and regulatory environment for public-private partnership in Nigeria. PhD thesis, Kingston University, UK.
Aslam, M (2021) Optimizing selection and implementation protocols of lean construction tools and techniques for rapid initial successes. PhD thesis, North Dakota State University, USA.
Atmo, G and Duffield, C (2014) Improving investment sustainability for PPP power projects in emerging economies: Value for money framework. Built Environment Project and Asset Management, 4(4), pp. 335-351. ISSN 2044-124X
Awodele, I A; Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 19-36. ISSN 1823-6499
Awuzie, B O; McWari, Z P; Chigangacha, P S; Aigbavboa, C O; Haupt, T C and Obi, L (2024) Analysing outsourced and insourced public infrastructure projects' performance in a provincial department of public works: A grounded theory approach. Journal of Engineering, Design and Technology, 22(2), pp. 456-479. ISSN 1726-0531
Azari Najafabadi, R (2013) An evaluation framework for the integrated design process of sustainable high-performance buildings. PhD thesis, University of Washington, USA.
Azmy, N (2012) The role of team effectiveness in construction project teams and project performance. PhD thesis, Iowa State University, USA.
Babalola, H I and Aliu, J O (2026) Lean construction practices for enhancing project delivery in the construction industry: Examining the beneficial outcomes. International Journal of Construction Management, 26(6), pp. 1097-1111. ISSN 1562-3599
Bagheri-Lotfabad, K.; Faghihi, S. V. and Hosseini Nourzad, S. H. (2026) Optimizing resilience in hospital networks: Site selection criteria for enhancing health-care infrastructure. International Journal of Disaster Resilience in the Built Environment, 17(3), pp. 342-374. ISSN 1759-5908
Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Banawi, A A (2013) Improving construction processes by integrating lean, green, and six-sigma. PhD thesis, University of Pittsburgh, USA.
Banerjee, S (2022) Developing an organization-wide knowledge repository with intelligent knowledge transference to enhance construction project outcomes. PhD thesis, North Carolina State University, USA.
Baroudi, B and R. Rapp, R (2014) Stakeholder management in disaster restoration projects. International Journal of Disaster Resilience in the Built Environment, 5(2), pp. 182-193. ISSN 1759-5916
Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.
Baumann, L (2013) The impact of national culture on project management in the Middle East. PhD thesis, Loughborough University, UK.
Bayhan, H G (2025) Transaction costs in construction project team communications: Language model and network science applications. PhD thesis, Michigan State University, USA.
Becker, T C; Jaselskis, E J and El-Gafy, M (2014) Improving predictability of construction project outcomes through intentional management of indirect construction costs. Journal of Construction Engineering and Management, 140(6): 4014014, ISSN 0733-9364
Ben Mahmoud, B; Lehoux, N; Blanchet, P and Jobidon, G (2026) Towards a resilient project delivery system selection: Evaluating the impact of external environment criteria for public infrastructure in quebec. Construction Management and Economics, 44(3), pp. 159-182. ISSN 0144-6193
Beyh, S (2004) Computer and communication engineering: internet protocol telephony in construction. PhD thesis, University of Salford, UK.
Bhattacharya, K; Sarkar, D and Chaturvedi, S (2025) A comprehensive study incorporating structural equation modeling and factor analysis study on the evaluation of performance criteria for infrastructure development projects. International Journal of Construction Management, 25(5), pp. 594-603. ISSN 1562-3599
Bilge, E C and Yaman, H (2021) Information management roles in real estate development lifecycle: Literature review on BIM and IPD framework. Construction Innovation, 21(4), pp. 723-742. ISSN 1471-4175
Bin Asad, S.; Purushothaman, M. B. and Poshdar, M. (2026) Interactions of factors affecting the implementation of integrated project delivery in the New Zealand construction industry: A system dynamics and network analysis approach. Construction Management and Economics, 44(6), pp. 453-479. ISSN 0144-6193
Bingham, E (2014) Analysis of the state of practice and best practices for alternative project delivery methods in the transportation design and construction industry. PhD thesis, Arizona State University, USA.
Bingol, B N; Arditi, D and Polat, G (2025) Subcontractor selection for a construction project: Optimal plan. Journal of Construction Engineering and Management, 151(12): 04025205, ISSN 0733-9364
Blismas, N G (2001) Multi project environments of construction clients. PhD thesis, Loughborough University, UK.
Bondinuba, F K; Bondinuba, N; Mewomo, C M; Camynta-Baezie, G and Abudu, H D (2025) Building collaborative advantage: Exploring innovative stakeholder engagement models for construction project success. International Journal of Construction Management, 25(16), pp. 1879-1891. ISSN 1562-3599
Bosfield, R; Gibson, G E and Din, Z U (2026) Open repository development framework for knowledge sharing: Best practices in the architecture, engineering, and construction industry. International Journal of Construction Management, 26(1), pp. 12-28. ISSN 1562-3599
Bou Hatoum, Makram Bou (2023) Value propositions, adoption factors, and implementation considerations: Building a path towards construction innovation. PhD thesis, University of Kentucky, USA.
Boudlal, Youssef Ait (2014) Project management and its relation to long-term project success: An empirically based theoretical framework. PhD thesis, University of Louisville, USA.
Boyes, Mark (2019) Embedding divergent thinking into project team decision making. PhD thesis, RMIT University, Australia.
Branch, H K (2018) Strategies construction project managers use to create environmental sustainability in construction projects. PhD thesis, Walden University, USA.
Branco Pedro, J; Meijer, F and Visscher, H (2010) Building control systems of European Union countries: A comparison of tasks and responsibilities. International Journal of Law in the Built Environment, 2(1), pp. 45-59. ISSN 1756-1450
Bresnen, M J (1991) Construction contracting in theory and practice: A case study. Construction Management and Economics, 9(3), pp. 247-262. ISSN 01446193
Brewer, G and Gajendran, T (2012) Attitudes, behaviours and the transmission of cultural traits: Impacts on ICT/BIM use in a project team. Construction Innovation, 12(2), pp. 198-215. ISSN 1471-4175
Brosque, C; Skeie, G and Fischer, M (2021) Comparative analysis of manual and robotic concrete drilling for installation hangers. Journal of Construction Engineering and Management, 147(3): 05021001, ISSN 0733-9364
Cai, Q Y; Ng, F F; Chen, H and Ding, Z K (2004) A framework for intelligent change management in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Carney, M; Wall, J; McNamee, F; Madden, D; Hurst, A; Vrasidas, C; Chanquoy, L; Baccino, T; Acar, E and Önwy-Yazici, E (2008) Challenges to delivering safety training through virtual classes. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Carpenter, N and Bausman, D C (2016) Project delivery method performance for public school construction: Design-bid-build versus CM at risk. Journal of Construction Engineering and Management, 142(10): 05016009, ISSN 0733-9364
Carrillo, S K C A P (2010) Findings from preliminary case studies on knowledge flow in aerospace and construction supply chains. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Casady, C B (2019) Assessing public-private partnership (PPP) governance, institutionalization, and market maturity in the United States and abroad. PhD thesis, Stanford University, USA.
Casady, C B and Baxter, D (2020) Pandemics, public-private partnerships (PPPs), and force majeure: COVID-19 expectations and implications. Construction Management and Economics, 38(12), pp. 1077-1085. ISSN 01446193
Cassandro, J; Mirarchi, C and Pavan, A (2025) A comprehensive literature review of 5D building information modelling using latent dirichlet allocation analysis. Construction Innovation, 25(7), pp. 331-357. ISSN 1471-4175
Castelblanco, G; Fenoaltea, E M; De Marco, A; Demagistris, P; Petruzzi, S and Zeppegno, D (2024) Combining stakeholder and risk management: Multilayer network analysis for complex megaprojects. Journal of Construction Engineering and Management, 150(2): 04023161, ISSN 0733-9364
Castelblanco, G and Guevara, J (2024) Stakeholder dynamics: Rethinking roles and responsibilities in user-pay transport PPP projects. Journal of Construction Engineering and Management, 150(8): 05024009, ISSN 0733-9364
Celentano, G (2021) The regenerative development potential of the construction sector in the informal city: The cases of Bangkok, Nairobi and Cape Town. DSc thesis, ETH Zürich, Switzerland.
Challender, J (2017) Trust in collaborative construction procurement strategies. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 115-124. ISSN 17514304
Challender, J; Farrell, P and Sherratt, F (2016) Collaborative trust in UK further education (FE) procurement strategies. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Chammout, B and El-Adaway, I H (2025) Circular economy in construction: Decision-making factors and future research avenues. Journal of Construction Engineering and Management, 151(6): 04025059, ISSN 0733-9364
Chan, A P C; Chan, D W M and Ho, K S K (2003) An empirical study of the benefits of construction partnering in Hong Kong. Construction Management and Economics, 21(5), pp. 523-533. ISSN 01446193
Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364
Chan, D M; Chan, A P C; Lam, P T I; Lam, E W M and Wong, J M W (2007) Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industry. Journal of Financial Management of Property and Construction, 12(3), pp. 139-150. ISSN 1366-4387
Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chang, R and Antwi-Afari, M F (2025) Critical success factors for implementing 3D printing technology in construction projects: Academics and construction practitioners' perspectives. Construction Innovation, 25(3), pp. 843-866. ISSN 1471-4175
Chao, C-H (2001) Formulation of an e -business inter-enterprise collaboration for the construction industry. PhD thesis, Northwestern University, USA.
Charles, S H; Chang-Richards, A and Yiu, T W (2022) What do post-disaster reconstruction project success indicators look like? End-user's perspectives. International Journal of Disaster Resilience in the Built Environment, 13(1), pp. 31-50. ISSN 1759-5916
Chen, G; Feng, Q; Ding, L; Li, Q and Yuan, M (2026) Revealing the impact of digital technology integration on prefabricated construction project performance. Journal of Construction Engineering and Management, 152(3): 04025271, ISSN 0733-9364
Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.
Chen, G (2023) Enhance collaboration reliability at task level for construction projects using blockchain technology. PhD thesis, North Carolina State University, USA.
Chen, K (2015) A strategic decision making framework for organisational BIM implementation. PhD thesis, Cardiff University, UK.
Chen, K; Lu, W; Wang, H; Niu, Y and Huang, G G (2017) Naming objects in BIM: A convention and a semiautomatic approach. Journal of Construction Engineering and Management, 143(7): 06017001, ISSN 0733-9364
Chen, L; Manley, K; Lewis, J; Helfer, F and Widen, K (2018) Procurement and governance choices for collaborative infrastructure projects. Journal of Construction Engineering and Management, 144(8): 04018071, ISSN 0733-9364
Chen, Y; Dib, H; Cox, R F; Shaurette, M and Vorvoreanu, M (2016) Structural equation model of building information modeling maturity. Journal of Construction Engineering and Management, 142(9): 04016032, ISSN 0733-9364
Chen, Y Q; Zhang, Y B and Zhang, S J (2014) Impacts of different types of owner-contractor conflict on cost performance in construction projects. Journal of Construction Engineering and Management, 140(6): 4014017, ISSN 0733-9364
Chenchu, M. K.; Ruikar, K. and Jha, K. N. (2026) Strategic social network analysis for overcoming knowledge management challenges in construction: An in-depth review. Engineering, Construction and Architectural Management, 33(7), pp. 5495-5521. ISSN 0969-9988
Cheng, M Y; Vu, Q T; Dessalegn, M and Chen, J H (2025) Time-dependent rebar price prediction for procurement decision-making using bio-optimized deep machine learning. Engineering, Construction and Architectural Management, 32(12), pp. 7938-7971. ISSN 0969-9988
Cheng, E W L; Li, H and Fox, P (2007) Job performance dimensions for improving final project outcomes. Journal of Construction Engineering and Management, 133(8), pp. 592-599. ISSN 0733-9364
Cheng, J C P and Venkataraman, V (2016) Analyzing relationships between project team compositions and green building certification in green building projects. Built Environment Project and Asset Management, 6(5), pp. 449-461. ISSN 2044-124X
Cherkos, F. D. and Kifle, K. T. (2026) Importance and interrelationship of stakeholder management critical success factors in Ethiopia mega construction projects. Built Environment Project and Asset Management, 16(2), pp. 242-262. ISSN 2044-124X
Cherkos, F. D. and Shuka, J. K. (2026) Human resource management practices for successful performance of construction companies: Unveiling hierarchical importance and interplay. International Journal of Construction Management, 26(7), pp. 1113-1133. ISSN 1562-3599
Chih, Y Y; Kiazad, K; Li, M; Capezio, A; Zhou, L and Restubog, S L D (2017) Broken promises: Implications for the job insecurity and job performance of Chinese construction workers. Journal of Construction Engineering and Management, 143(4): 04016114, ISSN 0733-9364
Chileshe, N; Kavishe, N and Edwards, D J (2023) Identification of critical capacity building challenges in public-private partnerships (PPPs) projects: The case of Tanzania. International Journal of Construction Management, 23(3), pp. 495-504. ISSN 1562-3599
Chinyio, E (1999) An evaluation of construction clients' needs and preferences. PhD thesis, University of Wolverhampton, UK.
Chiponde, D; Gledson, B and Greenwood, D (2019) Examining construction and project management perspectives of project-based failure. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Chiponde, D; Gledson, B and Greenwood, D (2024) The institutional field of learning from project-related failures: opportunities and challenges. Construction Economics and Building, 24(1-2), pp. 163-181. ISSN 2204-9029
Chiponde, D B; Gledson, B and Greenwood, D (2020) An integrated approach to learning from project-related failures. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Chivatá Cárdenas, Ibsen (2012) Integrating knowledge for managing risk in infrastructure projects: The case of tunnel works. PhD thesis, University of Twente, Netherlands.
Cho, N (2020) Using industry data to make an impact on construction practices over the project lifecycle. PhD thesis, Arizona State University, USA.
Chong, H Y; Zhang, Y; Lee, C Y; Wang, F and Zhang, Y (2025) Synchronizing BIM cost models and bills of quantities for lifecycle audit trail cost management. Engineering, Construction and Architectural Management, 32(10), pp. 6566-6592. ISSN 0969-9988
Christiansen, T R (1994) Modeling efficiency and effectiveness of coordination in engineering design teams. PhD thesis, Stanford University, USA.
Chung, J H (2015) Optimizing financial structure of transportation public-private partnership infrastructure projects based on traffic revenue risks: Case study of US DBFOM project. PhD thesis, University of Florida, USA.
Cleary, J (2024) Data driven insights into building project performance and outcomes through advanced data analytics. PhD thesis, Arizona State University, USA.
Coleman, C E; Mwanaumo, E M; Muya, M and Rahman, R A (2025) Financial challenges leading to premature contract termination in Ghanaian construction industry: Causes and mitigation strategies. Journal of Construction Business and Management, 7(2), pp. 45-66.
Conroy, G (1997) CONSERV: A methodology for the management of capital projects and concurrent engineering design using knowledge based technology. PhD thesis, Cranfield University, UK.
Corbett, D I (1997) Quantifying quality in industrial construction. PhD thesis, Pennsylvania State University, USA.
Correa, J. G. A.; Alves, J. L.; Homrich, A. S. and Carvalho, M. M. d (2026) Evolving skillsets of architecture, engineering and construction sector: Unveiling the interplay between project management, BIM, strategic and operational skills. Engineering, Construction and Architectural Management, 33(3), pp. 2422-2447. ISSN 0969-9988
Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.
Cui, Q; Davis, J S and Huang, H (2016) How happy are project managers in their jobs. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Dainty, A R J; Cheng, M I and Moore, D R (2003) Redefining performance measures for construction project managers: An empirical evaluation. Construction Management and Economics, 21(2), pp. 209-218. ISSN 01446193
Damoah, I S (2015) An investigation into the causes and effects of project failure in government projects in developing countries: Ghana as a case study. PhD thesis, Liverpool John Moores University, UK.
Dao, B P (2016) Exploring and measuring project complexity. PhD thesis, Texas A&M University, USA.
DarConte, F X (2017) Best value alignment process for public works construction in New York state. PhD thesis, Polytechnic Institute of New York University, USA.
Davies, K; McMeel, D J and Wilkinson, S (2017) Making friends with Frankenstein: Hybrid practice in BIM. Engineering, Construction and Architectural Management, 24(1), pp. 78-93. ISSN 0969-9988
De-Graft, O-M; Kukah, A S; Boateng, F; Asumadu, G and Edwards, D J (2021) Exploring strategies to reduce moral hazard and adverse selection of Ghanaian public-private partnership (PPP) construction projects. Journal of Engineering, Design and Technology, 19(2), pp. 358-372. ISSN 1726-0531
Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.
Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.
Deng, F and Smyth, H (2013) Contingency-based approach to firm performance in construction: Critical review of empirical research. Journal of Construction Engineering and Management, 139(10): 04013004, ISSN 0733-9364
Devkar, G; Palliyaguru, R and Oyegoke, A S (2020) The effects of institutional frameworks on implementation of PPP projects: A comparative perspective in Australia and India. International Journal of Construction Management, 20(6), pp. 720-736. ISSN 1562-3599
Diaz Schery, C. A.; Caiado, R. G. G.; Ivson, P.; Santos, R. S. and Thadeu Corseuil, E. (2026) An integrative framework for BIM, digital twin and generative AI convergence in construction: A multi-dimensional analysis of synergies and enabling factors. Smart and Sustainable Built Environment, pp. 1-39. ISSN 2046-6099
Dikmen, I; Birgonul, M T; Tah, J H M and Ozer, A H (2012) Web-based risk assessment tool using integrated duration-cost influence network model. Journal of Construction Engineering and Management, 138(9), pp. 1023-1034. ISSN 0733-9364
Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(3), pp. 287-298. ISSN 0969-9988
Dissanayake, N; Xia, B; Skitmore, M; Trigunarsyah, B and Menadue, V (2026) Developing a generic fuzzy multi-attribute analysis model for EPC contractor selection. Built Environment Project and Asset Management, 16(1), pp. 1-19. ISSN 2044-124X
Doan, D T; GhaffarianHoseini, A; Naismith, N; GhaffarianHoseini, A; Zhang, T and Tookey, J (2025) Structural equation modelling of building information modelling (BIM) adoption framework in New Zealand. Engineering, Construction and Architectural Management, 32(13), pp. 426-444. ISSN 0969-9988
Dobrucali, E; Demirkesen, S; Sadikoglu, E; Zhang, C and Damci, A (2024) Investigating the impact of emerging technologies on construction safety performance. Engineering, Construction and Architectural Management, 31(3), pp. 1322-1347. ISSN 0969-9988
Domingo, N (2011) Reducing construction waste in healthcare projects: a project lifecycle approach. PhD thesis, Loughborough University, UK.
Domingo, N; Osmani, M and Price, A D F (2008) Reducing construction waste in healthcare facilities: A project lifecycle approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Dubler, C R (2011) Evaluating waste associated with building information exchange using lean theory. PhD thesis, Pennsylvania State University, USA.
Duffield, Colin F (2001) An evaluation framework for privately funded infrastructure projects in Australia. PhD thesis, University of Melbourne, Australia.
Duva, M (2022) A multi-level and in-depth analysis of AEC project networks: Topology, social influence, and intervention. PhD thesis, Michigan State University, USA.
Dyas, V (2008) Constituents of performance: investigating relational contracting in a construction industry setting to establish a framework for drivers of performance. PhD thesis, Kingston University, UK.
Dzitouo, M (2024) Project performance of relational contracting: A critical success factors perspective. PhD thesis, Capella University, USA.
Dzokoto, F K (2016) Information behaviour of construction project actors. PhD thesis, Loughborough University, UK.
Ebrahimi, G and Dowlatabadi, H (2019) Perceived challenges in implementing integrated project delivery (IPD): Insights from stakeholders in the U.S. And Canada for a path forward. International Journal of Construction Education and Research, 15(4), pp. 291-314. ISSN 1557-8771
Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Eke, G; Elgy, J and Wedawatta, G (2019) Establishing a link between contractor selection strategy and project outcomes: Simulation study. Journal of Construction Engineering and Management, 145(10): 04019062, ISSN 0733-9364
Ekung, S; Odesola, I A and Adewuyi, T (2022) Green cost premium for attaining energy-efficiency rating in Nigeria's hot-humid residential buildings. International Journal of Building Pathology and Adaptation, 40(2), pp. 248-268. ISSN 23984708
ElAlem, M A; Mahdi, I M; Mohamadien, H A and Hosny, S (2025) Forecasting scope creep in Egyptian construction projects: An evaluation using artificial neural network (ANN) and random forest models. International Journal of Construction Management, 25(16), pp. 2082-2101. ISSN 1562-3599
Elbashbishy, T and El-Adaway, I H (2026) Assessing the criticality of construction trades: Skilled labor shortages and their cost and schedule impacts. Journal of Construction Engineering and Management, 152(1): 04025230, ISSN 0733-9364
Elbing, C and Devapriya, K A K (2004) Structured risk management process to achieve value for money in Public Private Partnerships. Journal of Financial Management of Property and Construction, 9(3), pp. 121-128. ISSN 1366-4387
Elghaish, F; Abrishami, S; Abu Samra, S; Gaterell, M; Hosseini, M R and Wise, R (2021) Cash flow system development framework within integrated project delivery (IPD) using BIM tools. International Journal of Construction Management, 21(6), pp. 555-570. ISSN 1562-3599
Ellis, R C T; Wood, G D and Thorpe, T (2004) Technology-based learning and the project manager. Engineering, Construction and Architectural Management, 11(5), pp. 358-365. ISSN 0969-9988
Engström, S; Sardén, Y and Stehn, L (2009) Towards improving client-contractor communication in industrialised building. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model. PhD thesis, Iowa State University, USA.
Esa, M (2015) The influence of project manager’s cognitive styles on project success in the Malaysian construction industry. PhD thesis, University of Malaya, Malaysia.
Essien, I O (2021) Modelling project complexity for leadership decision making and success in the building construction industry in Lagos, Nigeria. PhD thesis, Oxford Brookes University, UK.
Eyiah-Botwe, E (2017) Development of a sustainable stakeholder management framework for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.
Fadnavis, Aishwarya Sunil (2026) An integrated coordination framework for construction procurement: Examining early supplier involvement through agent-based modeling. PhD thesis, University of Washington, USA.
Fageha, Mohammed Kamal (2014) Managing stakeholders' participation to improve project scope definition completeness and enhance project outcome. PhD thesis, University of Melbourne, Australia.
Fakilede, J (2020) Strategies utility business organizations use to deliver construction projects on-budget and on-schedule. PhD thesis, Walden University, USA.
Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988
Faraji, A (2021) Neuro-fuzzy system based model for prediction of project performance in downstream sector of petroleum industry in Iran. Journal of Engineering, Design and Technology, 19(6), pp. 1268-1290. ISSN 1726-0531
Faris, H; Gaterell, M and Hutchinson, D (2024) Developing a collaborative framework for construction projects in emerging economies. Smart and Sustainable Built Environment, 13(1), pp. 199-216. ISSN 2046-6099
Faris, H M A (2020) Improving project collaboration to minimise the energy performance gap in residential construction: case study of Kurdistan. PhD thesis, University of Portsmouth, UK.
Fernando, S; Panuwatwanich, K and Thorpe, D (2021) Introducing an innovation promotion model for construction projects. Engineering, Construction and Architectural Management, 28(3), pp. 728-746. ISSN 0969-9988
Fewings, P and Hodgson, P (2005) Collaboration and learning: A business integration model. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Flett, P (2001) The role of quality in the management of projects. PhD thesis, University of Stirling, UK.
Fobiri, G; Musonda, I and Muleya, F (2025) Unlocking the full potential of reality capture for construction project cost monitoring: A mixed review. Journal of Engineering, Design and Technology, 23(3), pp. 830-853. ISSN 1726-0531
Franks, M S (2024) Managing complexity and uncertainty in megaprojects: A case study of Fort Friendly’s transformational megaprogram. DBA thesis, National University, USA.
Franz, B W and Olopade, J (2024) Exploring pathways to project success through project delivery team integration: A qualitative comparative analysis. Construction Management and Economics, 42(6), pp. 564-581. ISSN 01446193
Fu, Y; Chen, Y; Zhang, S and Wang, W (2015) Promoting cooperation in construction projects: An integrated approach of contractual incentive and trust. Construction Management and Economics, 33(8), pp. 653-670. ISSN 01446193
Fuentes, M E G (2019) Co-creation and co-destruction of experiential value: A service perspective in projects. Built Environment Project and Asset Management, 9(1), pp. 100-117. ISSN 2044-124X
Fuller, P A; Dainty, A R J; Thorpe, T and MacDonald, R (2009) Event-based measurement of learning in projects: A methodology. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.
Gale, K (2013) An evaluation of performance improvement within public sector construction framework agreements. PhD thesis, Anglia Ruskin University, UK.
Galotti, V (2025) An exploration of design-build risk and project profitability in the architecture, engineering and construction sector. PhD thesis, University of Colorado at Boulder, USA.
Gameson, R and Sher, W (2002) An investigation into project team dynamics and the utilization of virtual environments. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Gao, T (2014) Dynamic approach to stakeholder theory for temporary organizations. PhD thesis, Stevens Institute of Technology, USA.
Garciacortes, A (2017) Knowledge transfer and application in integrated project delivery teams. PhD thesis, Michigan State University, USA.
Gardner, Stephen T (2024) Technical and interpersonal skills and characteristics of successful construction project managers. PhD thesis, Griffith University, Australia.
Gasparro, K E (2019) Crowdfunding our cities: Three perspectives on stakeholder dynamics during innovative infrastructure delivery. PhD thesis, Stanford University, USA.
Georgekutty, C K (2014) Optimization of construction cost in construction materials. Unpublished PhD thesis, Cochin University of Science and Technology, India.
Georgiadou, M C (2019) An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects. Construction Innovation, 19(3), pp. 298-320. ISSN 1471-4175
Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya. PhD thesis, Brunel University, UK.
Gharaibeh, L.; Lantz, B. and Eriksson, K. M. (2026) Bridging the gap: A framework for monetizing BIM by integrating industry insights for informed decision-making. Smart and Sustainable Built Environment, 15(2), pp. 710-728. ISSN 2046-6099
Gilbert, Daryl (2024) Effective project management strategies for identifying and addressing projects' complexities and improving projects' success rates. DBA thesis, Walden University, USA.
Gorse, C A and Emmitt, S (2009) Informal interaction in construction progress meetings. Construction Management and Economics, 27(10), pp. 983-993. ISSN 1466433X
Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2001) Project performance and management and design team communication. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Gosling, J; Pero, M; Schoenwitz, M; Towill, D and Cigolini, R (2016) Defining and categorizing modules in building projects: An international perspective. Journal of Construction Engineering and Management, 142(11): 04016062, ISSN 0733-9364
Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: Partnering in-between systems of production, values and interests. Construction Management and Economics, 31(2), pp. 119-134. ISSN 1466433X
Grau, D and Back, W E (2015) Predictability index: Novel metric to assess cost and schedule performance. Journal of Construction Engineering and Management, 141(12): 04015043, ISSN 0733-9364
Greenwood, D J and Yates, D J (2006) The determinants of successful partnering: A transaction cost perspective. Journal of Construction Procurement, 12(1),
Guha, P; Kar, S and Jha, K N (2025) A framework to assess leadership quality of construction leaders. Journal of Construction Engineering and Management, 151(6): 04025047, ISSN 0733-9364
Gul, S (2012) The role of conflict & negotiation in the complexity of projects. PhD thesis, University of Southampton, UK.
Gunarathna, C; Yang, R J; Jayasuriya, S; Yi, X; Arashpour, M; Ning, X and Heng, X (2026) Design and development of blockchain-enabled information management system for building integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(15), pp. 72-114. ISSN 0969-9988
Gunnigan, L (2007) Increasing effectiveness of public private partnerships in the Irish construction industry. PhD thesis, University of Salford, UK.
Guo, Y; Liu, J; Chen, C; Luo, X and Martek, I (2024) PPP project price mode typologies: A China-based comparative case study. Engineering, Construction and Architectural Management, 31(5), pp. 2034-2052. ISSN 0969-9988
Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.
Gupta, T; Kothari, C and Misra, S (2025) Integrating 'difficulty in management' as a decision-making criterion in the risk assessment of PPP infrastructure projects. Construction Management and Economics, 43(7), pp. 502-517. ISSN 0144-6193
Gurevich, U; Sacks, R and Shrestha, P (2017) BIM adoption by public facility agencies: Impacts on occupant value. Building Research & Information, 45(6), pp. 610-630. ISSN 0961-3218
Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.
Halder, A. (2026) Modeling critical driving factors of stakeholder integration and their influences on construction megaproject performance: A regression-based analysis. Journal of Engineering, Design and Technology, 24(1), pp. 213-241. ISSN 1726-0531
Han, F and Bogus, S M (2021) Resilience criteria for project delivery processes: An exploratory analysis for highway project development. Journal of Construction Engineering and Management, 147(11): 04021140, ISSN 0733-9364
Han, J; Rapoport, A and Fong, P S W (2020) Incentive structures in multi-partner project teams. Engineering, Construction and Architectural Management, 27(1), pp. 49-65. ISSN 0969-9988
Han, S H (1999) Risk-based go/no-go decision making model for international construction projects: The cross-impact analysis approach. PhD thesis, University of Colorado at Boulder, USA.
Han, Y; Li, Y; Taylor, J E and Zhong, J (2018) Characteristics and evolution of innovative collaboration networks in architecture, engineering, and construction: Study of national prize-winning projects in China. Journal of Construction Engineering and Management, 144(6): 04018038, ISSN 0733-9364
Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364
Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(5), pp. 379-386. ISSN 0961-3218
Hardie, M and Saha, S (2009) Builders' perceptions of lowest cost procurement and its impact on quality. Construction Economics and Building, 9(1), pp. 1-8. ISSN 2204-9029
Harper, C M (2014) Measuring project integration using relational contract theory. PhD thesis, University of Colorado at Boulder, USA.
Harper, C M; Molenaar, K R and Cannon, J P (2016) Measuring constructs of relational contracting in construction projects: The owner's perspective. Journal of Construction Engineering and Management, 142(10): 04016053, ISSN 0733-9364
Harris, James Egerson (2025) Relationship between time assessment, cost projection, and project performance in the U.S. Government. DBA thesis, Walden University, USA.
Hawkey, Barry (2024) Qualitative comparative analysis of software development practices translated from scene to screen using the real-to-real method for inter-industry learning. PhD thesis, Colorado State University, USA.
Hermawan, F (2015) A strategic approach to enhancing sustainable practices in public building projects: a case study of Indonesian local authorities. PhD thesis, Coventry University, UK.
Hide, S (2003) Exploring accident causation in the construction industry. PhD thesis, Loughborough University, UK.
Hietajärvi, A-M; Aaltonen, K and Haapasalo, H (2017) Opportunity management in large projects: A case study of an infrastructure alliance project. Construction Innovation, 17(3), pp. 340-362. ISSN 1471-4175
Hiley, A and Gopsill, G (2000) The implementation of value management as a design management tool in the UK construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hiley, A and Yagci, O (2001) The implementation of constructability: A prerequisite in raising the quality of project outcome. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Hillestad, D (2022) Building owners and managers organizational maturity self-assessment for a facility condition assessment program. PhD thesis, Arizona State University, USA.
Holt, G D (2018) Let's change tack, not wind direction: A response to Kog and Yaman (2016). Engineering, Construction and Architectural Management, 25(3), pp. 335-341. ISSN 0969-9988
Hong, Z; Hong, Y; Cai, H; Abraham, D M; Zhang, J and Dunston, P S (2025) BIM-based framework for in-plant quality control of precast concrete manufacturing. Journal of Construction Engineering and Management, 151(12): 05025017, ISSN 0733-9364
Hossain, M K (2015) Investigating the relationship between the culture of construction project-based organisations and the implementation of building information modelling. PhD thesis, University of Dundee, UK.
Hosseinian, S M and Carmichael, D G (2013) Optimal incentive contract with risk-neutral contractor. Journal of Construction Engineering and Management, 139(8), pp. 899-909. ISSN 0733-9364
Hosseinian, S M and Jaberi, A (2025) Optimizing the distribution of outcomes across multiple levels of subcontracting in construction projects. Engineering, Construction and Architectural Management, 32(2), pp. 1278-1302. ISSN 0969-9988
Hosseinian, Seyedmahdi (2013) Optimal outcome sharing arrangements in construction target contracts. PhD thesis, University of New South Wales, Australia.
Huang, K-S (2003) Development-related BOT: A lesson of under-utilized and over-utilized development synergy in Taiwan. DDes thesis, Harvard University, USA.
Hurst, B E (2014) The effect of organizational commitment on project outcomes under common agency. PhD thesis, Capella University, USA.
Hussain, A; Ibrahim, C K I C; Belayutham, S; Manu, P and Nazruddin, M A (2023) Oshcim: A study on Malaysian occupational safety and health regulatory capabilities readiness in the design phase. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Huynh, N M; Le-Hoai, L and Do, C D (2025) Assessing and improving labor productivity management in construction: A practical framework and measurement tool. Construction Economics and Building, 25(1), pp. 69-96. ISSN 2204-9029
Hwang, B G and Ho, J W (2012) Front-end planning implementation in Singapore: Status, importance, and impact. Journal of Construction Engineering and Management, 138(4), pp. 567-573. ISSN 0733-9364
Hwee Lim, E N G and Yean Yng Ling, F (2002) Model for predicting clients' contribution to project success. Engineering, Construction and Architectural Management, 9(5-6), pp. 388-395. ISSN 0969-9988
Ibrahim, C K I C; Manu, P; Belayutham, S; Cheung, C; Mohamad, M Z; Yunusa-Kaltungo, A; Ismail, S and Hussain, A (2023) Factors influencing dfs adoption: The case of Malaysian construction organisations. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Idoro, G (2012) Comparing levels of use of project plans and performance of traditional contract and design-build construction projects in Nigeria. Journal of Engineering, Design and Technology, 10(1), pp. 7-33. ISSN 1726-0531
Idoro, G I (2011) Influence of in-sourcing and outsourcing of consultants on construction project performance in Nigeria. Construction Economics and Building, 11(4), pp. 45-58. ISSN 2204-9029
Idoro, G I (2012) Influence of project plans on the outcome of construction projects procured by design-build in Nigeria. Journal of Construction in Developing Countries, 17(2), pp. 81-103. ISSN 1823-6499
Idoro, G I (2012) Influence of the monitoring and control strategies of indigenous and expatriate Nigerian contractors on project outcome. Journal of Construction in Developing Countries, 17(1), pp. 51-69. ISSN 1823-6499
Idoro, G I (2012) The influence of project documents on the outcome of construction projects procured by traditional contracts in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 1-19. ISSN 1823-6499
Ikediashi, D I; Ogunlana, S O and Alotaibi, A (2014) Analysis of project failure factors for infrastructure projects in Saudi Arabia: A multivariate approach. Journal of Construction in Developing Countries, 19(1), pp. 35-52. ISSN 1823-6499
Ishtiaque, T A; Wondimu, P A and Klakegg, O J (2025) Likelihood of early contractor involvement (ECI) benefits in infrastructure versus building projects: The client's perception. International Journal of Construction Management, 25(10), pp. 1227-1238. ISSN 1562-3599
Ismail, S; Mohamad, R and Mohd Said, J (2022) Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia. Built Environment Project and Asset Management, 12(5), pp. 704-718. ISSN 2044-124X
Ismail, Z A B (2021) Towards a BIM-based approach for improving maintenance performance in IBS building projects. Engineering, Construction and Architectural Management, 28(5), pp. 1468-1490. ISSN 0969-9988
Iyer, K C; Kumar, R and Singh, S P (2020) Understanding the role of contractor capability in risk management: A comparative case study of two similar projects. Construction Management and Economics, 38(3), pp. 223-238. ISSN 01446193
Jabour Al Hazmi, H S (2011) National culture and knowledge sharing practices: Empirical study in the context of the procurement of educational building projects in Saudi Arabia. PhD thesis, Griffith University, Australia.
James, M; Moyo, T and Moyo, C (2025) Climate change literacy objectives for construction professionals in Zimbabwe. Built Environment Project and Asset Management, 15(1), pp. 85-105. ISSN 2044-124X
Jaselskis, E J and Ashley, D B (1991) Optimal allocation of project management resources for achieving success. Journal of Construction Engineering and Management, 117(2), pp. 321-340. ISSN 0733-9364
Jaselskis, E J and Russell, J S (1992) Risk analysis approach to selection of contractor evaluation method. Journal of Construction Engineering and Management, 118(4), pp. 814-821. ISSN 0733-9364
Jawad, S; Ledwith, A and Khan, R (2022) Project control system (PCS) implementation in engineering and construction projects: An empirical study in Saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 31(13), pp. 181-207. ISSN 0969-9988
Jimoh, I (2021) What explains the efficiency of major public project delivery in Nigeria? PhD thesis, University of Cambridge, UK.
Jin, S. (2026) Dynamics and influences analysis of public concerns in mega construction projects: An integrated topic and sentiment modeling approach. Journal of Construction Engineering and Management, 152(8): 04026104, ISSN 0733-9364
Jin, H; Liu, S; Li, J and Liu, C (2020) A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs. International Journal of Construction Management, 20(6), pp. 642-652. ISSN 1562-3599
Jin, H; Qu, X; Liu, B and Liu, C (2024) Examining the success drivers and barriers of modular building projects using qualitative comparative analysis. International Journal of Construction Management, 24(6), pp. 601-609. ISSN 1562-3599
Joseph Garcia, A and Mollaoglu, S (2020) Individuals' capacities to apply transferred knowledge in AEC project teams. Journal of Construction Engineering and Management, 146(4): 04020016, ISSN 0733-9364
Kamara, J M (2017) Maintaining focus on clients' requirements using the DQI tool: Towards a requirements-oriented project process. Built Environment Project and Asset Management, 7(3), pp. 271-283. ISSN 2044-124X
Kaminsky, J (2019) The global influence of national cultural values on construction permitting. Construction Management and Economics, 37(2), pp. 89-100. ISSN 01446193
Karamoozian, A and Wu, D (2020) A hybrid risk prioritization approach in construction projects using failure mode and effective analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2661-2686. ISSN 0969-9988
Karaz, Mahmoud Abdel Fattah Abdel Athim (2024) Construction waste management model for contractors using lean and BIM tools. PhD thesis, Universidade do Minho, Portugal.
Karimi, Rozi (2026) The impact of social media use on team feedback and team performance in construction site management practices. PhD thesis, Monash University, Australia.
Karlovsek, J; Meath, C; Miles-Mwangangi, L; MacDonald, C and Brockmann, A (2024) Implementing circular economy principles in infrastructure procurement to support circular supply chains. Engineering, Construction and Architectural Management, 31(11), pp. 4645-4658. ISSN 0969-9988
Ke, Y (2014) Is public-private partnership a panacea for infrastructure development? The case of Beijing national stadium. International Journal of Construction Management, 14(2), pp. 90-100. ISSN 1562-3599
Kelly, D and Ilozor, B (2022) Performance outcome assessment of the integrated project delivery (IPD) method for commercial construction projects in USA. International Journal of Construction Management, 22(14), pp. 2808-2816. ISSN 1562-3599
Kelly, D J (2015) Investigating the relationships of project performance measures with the use of building information modeling (BIM) and integrated project delivery (IPD). PhD thesis, Eastern Michigan University, USA.
Kent, D C and Becerik-Gerber, B (2010) Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management, 136(8), pp. 815-825. ISSN 0733-9364
Kereri, J O (2020) The effects of relational and social behaviors exhibited by construction project team members on relationship quality and project outcomes. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Khalifa, R I (2019) Evaluating project assessment techniques for high-profile transportation projects development and delivery: Case of state departments of transportation (DOTS) in the United States. PhD thesis, Portland State University, USA.
Khalife, Salam (2023) Developing advanced approaches to deliver value on construction projects: Integrating social dynamics, digital modelling techniques, and lean concepts. PhD thesis, University of Alberta, Canada.
Khan, Mona (2025) System of systems framework for structured risk analysis in complex engineering projects involving alliance. PhD thesis, RMIT University, Australia.
Khanh, K D; Minh, N V and Dinh Thuc, L (2025) Enhancing the accuracy of construction project completion estimates by incorporating updated timing-based error margins (utems). International Journal of Construction Management, 25(15), pp. 1859-1868. ISSN 1562-3599
Khanyile, N S M; Musonda, I and Agumba, J N (2019) Evaluating the relationship between communication management practices and project outcomes: A case study of Eswatini (Swaziland) construction industry. Construction Economics and Building, 19(2), pp. 197-219. ISSN 2204-9029
Khlaifat, D M; Alyagoub, R E; Sweis, R J and Sweis, G J (2019) Factors leading to construction projects' failure in Jordan. International Journal of Construction Management, 19(1), pp. 65-78. ISSN 1562-3599
Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988
Kim, D Y (2011) Construction planning and execution strategies for enhancing project success on electrical construction subcontracts. PhD thesis, University of Texas at Austin, USA.
Kirby, M; Rotimi, F E and Naismith, N (2025) Factors for improving productivity in the New Zealand residential construction sector. Journal of Engineering, Design and Technology, 23(5), pp. 1712-1728. ISSN 1726-0531
Kishk, M a U C (2008) The impact of effective risk management on project success. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Kivrak, S; Ross, A; Arslan, G and Tuncan, M (2009) Impacts of cultural d1 fferences on project success 1 n construct1 on. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Ko, J H; Park, S H and Kim, D C (2015) Efficiency analysis of project management offices for large-scale information system projects: Insights for construction megaprojects. Construction Economics and Building, 15(3), pp. 34-47. ISSN 2204-9029
Kohn, M J (1970) The stock of unfinished construction in the USSR, 1950-1965: An efficiency problem in a centrally planned economy. PhD thesis, Yale University, USA.
Kometa, S T (1995) An evaluation of client-generated risks in construction consultancies. PhD thesis, University of Wolverhampton, UK.
Koo, H J and O’Connor, J T (2022) Building information modeling as a tool for prevention ofdesign defects. Construction Innovation, 22(4), pp. 870-890. ISSN 1471-4175
Koops, L S W (2017) Creating public value: Optimizing cooperation between public and private partners in infrastructure projects. PhD thesis, Delft University of Technology, Netherlands.
Kor, M; Yitmen, I and Alizadehsalehi, S (2023) An investigation for integration of deep learning and digital twins towards construction 4.0. Smart and Sustainable Built Environment, 12(3), pp. 461-487. ISSN 2046-6099
Koseoglu, O; Sakin, M and Arayici, Y (2018) Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project. Engineering, Construction and Architectural Management, 25(10), pp. 1339-1354. ISSN 0969-9988
Koutsikouri, D (2010) Individual and collective success: the social dynamics of multidisciplinary design teamwork. EngD thesis, Loughborough University, UK.
Koutsikouri, D; Austin, S and Dainty, A (2008) Critical success factors in collaborative multidisciplinary design projects. Journal of Engineering, Design and Technology, 6(3), pp. 198-226. ISSN 1726-0531
Koutsikouri, D; Austin, S and Dainty, A (2008) Critical success factors in collaborative multi-disciplinary design projects. Journal of Engineering, Design and Technology, 6(3), pp. 198-226. ISSN 1726-0531
Kuitert, L; Volker, L and Hermans, M (2016) Safeguarding public values by project-based construction clients: Leads for future research. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Kuitert, L; Volker, L and Hermans, M H (2017) Public commissioning in a new era: Public value interests of construction clients. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kurul, E (2003) Re-using listed buildings through conversion: A process mapping approach. PhD thesis, University College London, UK.
Kusuma, I C (2016) The evolution of culture-climate interplay in temporary multi-organisations: the case of construction alliancing projects. PhD thesis, University College London, UK.
Kwafo, D G (2021) Strategies for improving performance of project managers in Ghana to reduce delays. PhD thesis, Walden University, USA.
Lam, T Y M and Gale, K S (2026) Construction framework process: A qualitative investigation of behaviour change drivers and project outcomes. Construction Innovation, 26(1), pp. 83-96. ISSN 1471-4175
Lam, T Y M (2022) Driving sustainable construction development through post-contract key performance indicators and drivers. Smart and Sustainable Built Environment, 11(3), pp. 483-499. ISSN 2046-6099
Lam, T Y M and Gale, K S (2023) A performance-driving model for public-sector construction framework procurement in England. Built Environment Project and Asset Management, 13(6), pp. 781-798. ISSN 2044-124X
Lambert, E L (2015) Complex factors related to capital construction project success: A case study. PhD thesis, Capella University, USA.
Lan, R; Adenuga, O and Awolusi, I (2025) Impact of construction project failure on key project stakeholders: Assessing the perspectives of professionals in Lagos metropolis. Construction Economics and Building, 25(3-4), pp. 90-120. ISSN 2204-9029
Lan, R; Adenuga, O and Awolusi, I (2026) Professionals' perspectives on the factors causing construction project failures in developing countries: A case study of Lagos metropolis. International Journal of Construction Management, 26(3), pp. 511-535. ISSN 1562-3599
Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(9), pp. 2060-2083. ISSN 0969-9988
Laryea, S and Lubbock, A (2014) Tender pricing environment of subcontractors in the United Kingdom. Journal of Construction Engineering and Management, 140(1): 04013029, ISSN 0733-9364
Latorre, V and Riley, M (2010) Utilizing analytical hierarchy process to prioritize critical success factors in construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Lau, E and Rowlinson, S (2009) The expectations, needs, risks and constraints for project performance. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Lavikka, R H; Kyrö, R; Peltokorpi, A and Särkilahti, A (2019) Revealing change dynamics in hospital construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 1946-1961. ISSN 0969-9988
Lawson, B; Statsenko, L and Shokri-Ghasabeh, M (2022) Value co-creation in asset integrity and improvement portfolio: Evidence from the Australian mining industry. Journal of Engineering, Design and Technology, 20(2), pp. 516-542. ISSN 1726-0531
Le, T; Caldas, C H; Gibson, G E and Thole, M (2009) Assessing scope and managing risk in the highway project development process. Journal of Construction Engineering and Management, 135(9), pp. 900-910. ISSN 0733-9364
Lee, N H (2009) A framework for developing new visualization schemes for construction project performance monitoring. PhD thesis, University of Washington, USA.
Lefebvre, G (2009) The influence of the psychological characteristics of the team members on construction project performance. PhD thesis, University of Salford, UK.
Leicht, R and Harty, C (2017) Influence of multiparty IPD contracts on construction innovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Lester, D and Torero, J (2019) Using megaproject performance outcomes to enhance decision-making behaviors in civil engineering graduates. Construction Economics and Building, 19(1), pp. 96-110. ISSN 2204-9029
Leung, M Y and Liu, A M M (1998) Developing a value management model by value-goal system approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Leung, M Y and Liu, A M M (2003) Analysis of value and project goal specificity in value management. Construction Management and Economics, 21(1), pp. 11-19. ISSN 01446193
Leung, M Y; Wei, X and Wang, C (2023) Demystifying critical success factors for applying value management in construction projects along the belt and road regions: Focus group study. Journal of Construction Engineering and Management, 149(8): 04023066, ISSN 0733-9364
Li, H T (2013) Modeling and evaluating multi-stakeholder multi-objective decisions during public participation in major infrastructure and constructionprojects. PhD thesis, University of Hong Kong, Hong Kong.
Li, T H Y; Thomas Ng, S and Skitmore, M (2016) Modeling multi-stakeholder multi-objective decisions during public participation in major infrastructure and construction projects: A decision rule approach. Journal of Construction Engineering and Management, 142(3): 04015087, ISSN 0733-9364
Liao, L; Teo, E A L and Low, S P (2017) A project management framework for enhanced productivity performance using building information modelling. Construction Economics and Building, 17(3), pp. 1-26. ISSN 2204-9029
Lidelow, S and Engstrom, S (2015) Furthering sustainable building or not? Discussing contractors' reflections on a sustainable building pilot project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ling, F Y Y and Hien, M B T (2014) Boosting project outcomes through goal alignment: A case study of Vietnam. Construction Economics and Building, 14(2), pp. 73-86. ISSN 2204-9029
Ling, F Y Y and Khoo, W W (2016) Improving relationships in project teams in Malaysia. Built Environment Project and Asset Management, 6(3), pp. 284-301. ISSN 2044-124X
Ling, F Y Y; Low, S P; Wang, S and Egbelakin, T (2008) Models for predicting project performance in China using project management practices adopted by foreign AEC firms. Journal of Construction Engineering and Management, 134(12), pp. 983-990. ISSN 0733-9364
Ling, F Y Y and Tran, H B T (2012) Ingredients to engender trust in construction project teams in Vietnam. Construction Innovation, 12(1), pp. 43-61. ISSN 1471-4175
Ling, F Y Y and Tran, P Q (2012) Effects of interpersonal relations on public sector construction contracts in Vietnam. Construction Management and Economics, 30(12), pp. 1087-1101. ISSN 1466433X
Liu, A M M (1997) Developing a research model for project outcome evaluation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Liu, A M M (1999) A research model of project complexity and goal commitment effects on project outcome. Engineering, Construction and Architectural Management, 6(2), pp. 105-111. ISSN 0969-9988
Liu, A M M (2003) The quest for quality in public housing projects: A behaviour-to-outcome paradigm. Construction Management and Economics, 21(2), pp. 147-158. ISSN 01446193
Liu, A M M; Fellows, R and Ng, J (2004) Surveyors' perspectives on ethics in organisational culture. Engineering, Construction and Architectural Management, 11(6), pp. 438-449. ISSN 0969-9988
Liu, A M M; Lau, W S W and Fellows, R (2012) The contributions of environmental management systems towards project outcome: Case studies in Hong Kong. Architectural Engineering and Design Management, 8(3), pp. 160-169. ISSN 1745-2007
Liu, J (2024) Value co-creation for public–private partnership (PPP) projects in China: A holistic framework from antecedents to outcomes of interaction. PhD thesis, University of Technology Sydney, Australia.
Liu, Y; Wang, X; Zhang, J and Guo, S (2025) How risk factors lead to the early termination of public–private partnership projects in China: A multi-case study based on social network analysis and interpretive-structure modeling. Engineering, Construction and Architectural Management, 32(2), pp. 824-846. ISSN 0969-9988
Loh, Chang-Yuan (2014) Factors influencing the decision-making of third party consultants in the context of evaluating escalation of commitment. PhD thesis, University of Sydney, Australia.
Loosemore, M; Braham, R; Yiming, Y and Bronkhorst, C (2020) Relational determinants of construction project outcomes: A social network perspective. Construction Management and Economics, 38(11), pp. 1061-1076. ISSN 01446193
Love, P E D; Davis, P R; Chevis, R and Edwards, D J (2011) Risk/reward compensation model for civil engineering infrastructure alliance projects. Journal of Construction Engineering and Management, 137(2), pp. 127-136. ISSN 0733-9364
Love, P E D; Leonard, D; Matthews, J; Ford, G and Fang, W (2024) Setting a course to validate and operationalize quality II in construction. Journal of Construction Engineering and Management, 150(12): 06024002, ISSN 0733-9364
Lu W, Z D R S (2013) BIM collaboration: A conceptual model and its characteristics. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Luo, Z; Jiang, Y; Li, X; Wu, R and Pan, H (2026) Financing mode selection and key success factors in area comprehensive development projects based on if-multimoora. Journal of Construction Engineering and Management, 152(4): 04026032, ISSN 0733-9364
Luo, L; He, Q; Jaselskis, E J and Xie, J (2017) Construction project complexity: Research trends and implications. Journal of Construction Engineering and Management, 143(7): 04017019, ISSN 0733-9364
Luu, D T; Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - An empirical survey. Engineering, Construction and Architectural Management, 10(3), pp. 209-218. ISSN 0969-9988
Ma, Q; Li, S and Cheung, S O (2022) Unveiling embedded risks in integrated project delivery. Journal of Construction Engineering and Management, 148(1): 04021180, ISSN 0733-9364
Mahdi, H S and Carmichael, D G (2014) Optimal sharing arrangement for multiple project outcomes. Journal of Financial Management of Property and Construction, 19(3), pp. 264-280. ISSN 1366-4387
Majumdar, T (2024) Pmc: A classification of production metrics found useful by AEC professionals. PhD thesis, Stanford University, USA.
Mamun, M T (2021) Development of a governance framework for delivery of collaborative and security-minded BIM projects. PhD thesis, University of Salford, UK.
Mandujano Rodríguez, M G (2016) A method to identify virtual design and construction implementation strategies from a lean construction perspective. DEng thesis, Pontificia Universidad Catolica de Chile, Chile.
Mangano, G; Castelblanco, G; De Marco, A and Ottaviani, F M (2025) Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), pp. 193-210. ISSN 2044-124X
Manley, K and Chen, L (2015) Collaborative learning model of infrastructure construction: A capability perspective. Construction Innovation, 15(3), pp. 355-377. ISSN 1471-4175
Mannarino, J A (2001) Evaluation of the construction management delivery system and establishing a model for selection: A qualitative approach. PhD thesis, State University of New York at Buffalo, USA.
Mansell, P R (2021) Measuring infrastructure projects sustainable development goals impact (MISI). PhD thesis, London South Bank University, UK.
Manu, E (2014) Supply chain management practices in construction and inter-organisational trust dynamics. PhD thesis, University of Wolverhampton, UK.
Manu, E; Ankrah, N; Chinyio, E A and Proverbs, D (2016) Functional consequences of trust in the construction supply chain: A multi-dimensional view. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Marisa, A and Yusof, N A (2020) Factors influencing the performance of architects in construction projects. Construction Economics and Building, 20(3), pp. 20-36. ISSN 2204-9029
Martin, H; Koylass, J and Welch, F (2018) An exploration of the consistency limits of the analytical hierarchy process and its impact on contractor selection. International Journal of Construction Management, 18(1), pp. 14-25. ISSN 1562-3599
Martin, H; Lewis, T M and Petersen, A (2016) Factors affecting the choice of construction project delivery in developing oil and gas economies. Architectural Engineering and Design Management, 12(3), pp. 170-188. ISSN 1745-2007
Martin, H and Ramjarrie, K (2021) Cloud contractor selection model for design-build open tender. Journal of Construction Engineering and Management, 147(4): 04021020, ISSN 0733-9364
Matsane, Z S-s (2023) An integrated SCM model for collaborative working in construction in South Africa. PhD thesis, University of Johannesburg, South Africa.
Maurya, T; Kalita, J D and Kar, S (2026) Assessing safety scores of multimodal activities to integrate safety into construction planning. Journal of Construction Engineering and Management, 152(5): 04026039, ISSN 0733-9364
Mazen, A M (2023) The extent to which the national and organisational culture contributes to delays of Libyan construction projects. PhD thesis, Bournemouth University, UK.
Meifrinaldi, S R C P (2024) Stakeholder readiness for integrated project delivery in public sector construction: The role of maturity models. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Mejia Aguilar, G (2013) Improving accuracy of project outcome predictions. PhD thesis, University of Alabama, USA.
Mellado, F; Wong, P F; Amano, K; Johnson, C and Lou, E C W (2020) Digitisation of existing buildings to support building assessment schemes: Viability of automated sustainability-led design scan-to-BIM process. Architectural Engineering and Design Management, 16(2), pp. 84-99. ISSN 1745-2007
Memon, F A (2023) Stakeholder engagement in managing scope change during the execution phase of UK construction projects. PhD thesis, University of Bedfordshire, UK.
Menches, C L (2006) Effect of pre-construction planning on electrical project performance. PhD thesis, University of Wisconsin - Madison, USA.
Menches, C L and Hanna, A S (2006) Conceptual planning process for electrical construction. Journal of Construction Engineering and Management, 132(12), pp. 1306-1313. ISSN 0733-9364
Mock, B and O’Connor, J T (2019) Owner and contractor solution strategies for industrial commissioning. Construction Innovation, 19(2), pp. 256-279. ISSN 1471-4175
Mohammad Shamsudin, N A (2021) Perceptions of critical success factors in the management of dilapidated schools' reconstruction projects using Industrialised Building System method in rural areas in Sarawak. PhD thesis, University of Nottingham, UK.
Mohammed, A; Bahatheq, A; Ghaithan, A; Alshibani, A; Mazher, K M and Alrashidi, A (2026) Predicting schedule delays of construction projects in the oil and gas industry: Comparative study. Built Environment Project and Asset Management, 16(2), pp. 286-303. ISSN 2044-124X
Mohammed, S (2022) Effect of political corruption on project failure. A multilevel inquiry on the effects of corruption on public sector construction project failure in emerging and advanced market economies. DBA thesis, Northcentral University, USA.
Mojela, T. W.; Laryea, S.; Zungu, Z. and Kwasafo, O. K. (2026) Client and contractor experiences in framework construction agreements in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 154-168. ISSN 1751-4304
Mols, Rex W (2021) Examination of the relationship between external environmental conditions and construction project failures in countries of Northern Africa. DBA thesis, Liberty University, USA.
Moorhead, Matthew (2019) Feasibility analysis in the pre-commitment stages of the property development process: An examination of uncertainty, risk and heuristic bias in management decision making Processes During the Pre‐commitment Stages of the Property Development Process in Australia. PhD thesis, Bond University, Australia.
Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams. PhD thesis, University of Colorado at Denver, USA.
Murphy, M (2016) Exploration of the synergies between activity theory and the dmaic method in evaluating construction processes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Musselwhite D, G B (2024) An analysis of activity-level predictability from UK construction projects. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Myint, K. Z. and Hadikusumo, B. H. W. (2026) Key factors influencing governance in transport infrastructure public-private partnership projects in Myanmar: Case study approach. International Journal of Construction Management, 26(10), pp. 2258-2278. ISSN 1562-3599
Naanaa, H.; Bril El Haouzi, H.; Derigent, W. and Lezoche, M. (2026) A semantic search system for efficient information retrieval in the construction domain. Smart and Sustainable Built Environment, 15(5), pp. 1781-1807. ISSN 2046-6099
Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099
Newton, K L and Chileshe, N (2012) Awareness, usage and benefits of building information modelling (BIM) adoption-the case of South Australian construction organizations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ng, S T and Hon, W C W (2011) Concerns of the society on new mega infrastructure and construction projects in Hong Kong. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Ng, S T; Xie, J and Kumaraswamy, M M (2010) Simulating the effect of risks on equity return for concession-based public-private partnership projects. Engineering, Construction and Architectural Management, 17(4), pp. 352-368. ISSN 0969-9988
Nguyen, T H; Shehab, T and Gao, Z (2008) Selecting an architecture-engineering team by using fuzzy set theory. Engineering, Construction and Architectural Management, 15(3), pp. 282-298. ISSN 0969-9988
Nguyen, T P and Chileshe, N (2015) Revisiting the construction project failure factors in Vietnam. Built Environment Project and Asset Management, 5(4), pp. 398-416. ISSN 2044-124X
Nguyen, T Q; Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(4), pp. 704-728. ISSN 23984708
Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364
Nguyen, T S; Mohamed, S and Mostafa, S (2024) Optimising project outcomes in complex environments: Empirical insights on agile practices and stakeholder dynamics. Built Environment Project and Asset Management, 14(4), pp. 590-606. ISSN 2044-124X
Nguyen T P, C N (2013) Revisiting the critical factors causing failure of construction projects in Vietnam. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Nguyen Van, D; Le Dinh, T and Tran, H-B (2022) Assessing stakeholder satisfaction in PPP transport projects in developing countries: Evidence from Vietnam. Built Environment Project and Asset Management, 12(2), pp. 309-324. ISSN 2044-124X
Ning, Y (2013) Boosting public construction project outcomes through relational transactions in Singapore. PhD thesis, National University of Singapore, Singapore.
Ning, Y and Ling, F Y Y (2014) Boosting public construction project outcomes through relational transactions. Journal of Construction Engineering and Management, 140(1): 04013037, ISSN 0733-9364
Noor, Muhammad Ali (2012) Investigating the role of procurement practices in effective implementation of infrastructure projects in a developing country: A case of Pakistan. PhD thesis, RMIT University, Australia.
Noorizadeh, A; Peltokorpi, A and Avkiran, N K (2019) Supplier performance evaluation in construction projects: Challenges and possible solutions. Journal of Construction Engineering and Management, 145(4): 04019007, ISSN 0733-9364
Norell, M and Stehn, L (2025) Architects coping with continuous fragmentation. Architectural Engineering and Design Management, 21(1), pp. 1-16. ISSN 1745-2007
Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175
Nwajei, U O K (2021) How relational contract theory influence management strategies and project outcomes: A systematic literature review. Construction Management and Economics, 39(5), pp. 432-457. ISSN 01446193
Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165
Obeng-Ahenkora, N. K.; Danso, H. and Kheni, N. A. (2026) Principal component analysis of factors influencing the choice of procurement methods for the procurement of construction materials in Ghana. Engineering, Construction and Architectural Management, 33(7), pp. 5300-5317. ISSN 0969-9988
Obi, L I; Arif, M; Lamb, S M and Ashayeri, I (2025) Establishing interrelationships and dependencies of critical success factors for implementing offsite construction in the UK. Smart and Sustainable Built Environment, 14(3), pp. 810-834. ISSN 2046-6099
Ochieng, E and Price, A D F (2005) Integration and cultural engineering on projects in developing countries (Kenya). In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364
Ojiako, G U (2005) Project failures: A comparative study of information and communication technologies (ICT) and construction projects. PhD thesis, University of Northumbria at Newcastle, UK.
Ojo, L D; Ogunsemi, D R; Elyamany, A and Oke, A E (2025) Profound barriers to value management adoption on construction projects in a developing nation. Journal of Engineering, Design and Technology, 23(1), pp. 264-286. ISSN 1726-0531
Okakpu, A I (2019) Investigating the effectiveness of adopting building information modelling for refurbishment of complex buildings: Case study of auckland. PhD thesis, Auckland University of Technology, New Zealand.
Oke, A E; Aliu, J; Mwanaumo, E M M; Abayomi, T and Kahanji, C (2023) Leveraging gamification to enhance productivity and employee engagement in the Nigerian construction industry. Built Environment Project and Asset Management, 13(6), pp. 813-829. ISSN 2044-124X
Okeke, R.; Garuba, B. and Orji, F. (2025) The role of team temporal leadership in driving construction project success: A meta-analytical review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 82-107. ISSN 1751-4304
Olasunkanmi, F. F. O. (2026) Structural equation modelling for the impacts of transactional leadership styles on project performance. Construction Economics and Building, 26(2), ISSN 2204-9029
Olatunji, O A; Rotimi, J O B; Rotimi, F E and Silva, C C W (2025) Causal relationship between project financing and overruns in major dam projects in Africa. Engineering, Construction and Architectural Management, 32(10), pp. 6480-6508. ISSN 0969-9988
Olatunji, O A (2014) Views on building information modelling, procurement and contract management. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 117-126. ISSN 17514304
Olatunji, O A; Ramanayaka, C D E; Rotimi, F E and Rotimi, J O B (2023) Analysis of contractors' administrative characteristics in bid decision factors. Engineering, Construction and Architectural Management, 30(6), pp. 2420-2435. ISSN 0969-9988
Oliomogbe G O, S N J (2013) Does the deployment of project management itself provide benefits? Both tangible and intangible. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.
Ombwayo, J; Kidombo, H and Gakuu, C (2026) Moderating influence of stakeholder involvement on the relationship between project management lifecycle and performance of slum upgrading projects: A case of Nairobi city county, Kenya. International Journal of Construction Management, 26(1), pp. 1-11. ISSN 1562-3599
Omoregie, I. I. and Aigbavboa, C. O. (2026) Exploring strategies for strengthening stakeholder communication to advance sustainable construction practices in the Nigerian built environment. Engineering, Construction and Architectural Management, 33(15), pp. 414-431. ISSN 0969-9988
Onyia, U (2019) Improving the supervisory and managerial skills and competences required in construction management in Nigeria. PhD thesis, London South Bank University, UK.
Opdyke, A (2017) Resilient and sustainable infrastructure systems: A comparative analysis of post-disaster shelter coordination, stakeholder participation, and training. PhD thesis, University of Colorado at Boulder, USA.
Osaghae, E and Olatunji, O A (2024) Key drivers of value amongst multicultural teams in construction projects. International Journal of Construction Management, 24(14), pp. 1581-1588. ISSN 1562-3599
Otto, H T (1985) The economics of the construction sector of the ussr. PhD thesis, University of Houston, USA.
Ouma, L A; Castronovo, F; Rupinder, K and Leicht, R (2026) Assessment instrument for lean journeys in integrated project delivery: Lean learning health assessment (llha). Engineering, Construction and Architectural Management, 33(15), pp. 47-71. ISSN 0969-9988
Owusu-Manu, D G; Kukah, A S; Boateng, F; Asumadu, G and Edwards, D J (2021) Exploring strategies to reduce moral hazard and adverse selection of Ghanaian public–private partnership (PPP) construction projects. Journal of Engineering, Design and Technology, 19(2), pp. 358-372. ISSN 1726-0531
Oyediran, A; Oke, A E; Ikuabe, M; Aliu, J; Adeosun, F E and Aigbavboa, C O (2025) Exploring application areas of cyber-physical systems in the construction industry: A case of Nigeria. International Journal of Construction Management, 25(15), pp. 1811-1823. ISSN 1562-3599
Oyenubi, A. and Oyeyipo, O. O. (2026) Cost-carbon trade-offs in green infrastructure: A case of Nigeria. Journal of Engineering, Design and Technology, 24(3), pp. 805-830. ISSN 1726-0531
Oyenubi, A. and Oyeyipo, O. O. (2026) Overcoming GenAI adoption barriers in construction cost management: Evidence from Nigeria. Construction Innovation, pp. 1-26. ISSN 1471-4175
Oyeyipo, O; Adeyemi, B; Osuizugbo, I and Ojelabi, R (2022) Service quality of building services consultants in building project delivery; clients' perspectives. International Journal of Construction Management, 22(15), pp. 2886-2894. ISSN 1562-3599
Parkin, Debbie (2021) Projects initiated in response to major emergencies: A pathway to future public value. PhD thesis, RMIT University, Australia.
Parvan, K (2012) Estimating the impact of building information modeling (BIM) utilization on building project performance. PhD thesis, University of Maryland, College Park, USA.
Payne, B (1998) Project risk analysis. PhD thesis, Nottingham Trent University, UK.
Perera, S; Adeniyi, O; Babatunde, S O and Ginige, K (2018) Mapping built environment professionals' educational needs to international policy frameworks for disaster risk reduction: community stakeholder perspective. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 368-384. ISSN 1759-5916
Pham, V. H. S. and Pham, D. H. (2026) Advanced construction site layout planning for prefabricated projects: An application of the new algorithm. Engineering, Construction and Architectural Management, 33(3), pp. 2471-2511. ISSN 0969-9988
Phelps, A F (2008) Lean information flow in complex healthcare projects and the role of the “integrator” as information flow manager. PhD thesis, Pennsylvania State University, USA.
Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.
Poirier, E A; Forgues, D and Staub-French, S (2017) Understanding the impact of BIM on collaboration: A Canadian case study. Building Research & Information, 45(6), pp. 681-695. ISSN 0961-3218
Ponton, H; Osborne, A; Greenwood, D and Thompson, N (2019) Exploring the designer-constructor teamwork interface to improve collaboration: A review of current literature. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Porwal, A; Parsamehr, M; Szostopal, D; Ruparathna, R and Hewage, K (2023) The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. International Journal of Construction Management, 23(1), pp. 156-166. ISSN 1562-3599
Pour Aghajan, Marjan (2025) Supporting early decision-making between precast and in-situ concrete in construction industry. PhD thesis, Queensland University of Technology, Australia.
Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988
Powl, A and Skitmore, M (2005) Factors hindering the performance of construction project managers. Construction Innovation, 5(1), pp. 41-51. ISSN 1471-4175
Puddicombe, M S (2006) The limitations of planning: The importance of learning. Journal of Construction Engineering and Management, 132(9), pp. 949-955. ISSN 0733-9364
Quaigrain, R A; Owusu-Manu, D; Edwards, D J and Danquah, D D (2026) Investigating the relationship between organizational mindset orientation and project performance of large organizations in the Ghanaian construction industry. International Journal of Construction Education and Research, 22(1), pp. 2-26. ISSN 1557-8771
Ragab, M A and Marzouk, M (2021) BIM adoption in construction contracts: Content analysis approach. Journal of Construction Engineering and Management, 147(8): 0002123, ISSN 0733-9364
Rahat, R; Ferrer, V; Pradhananga, P and ElZomor, M (2023) Developing an effective front-end planning framework for sustainable infrastructure projects. International Journal of Construction Management, 23(16), pp. 2841-2858. ISSN 1562-3599
Rahman, M. L.; Ayentimi, D. T.; Wickham, M. and Mbiro, J. E. (2026) A contemporary framework for sustainable entrepreneurial project management. Engineering, Construction and Architectural Management, 33(15), ISSN 0969-9988
Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988
Rahmani, F (2021) Challenges and opportunities in adopting early contractor involvement (ECI): Client's perception. Architectural Engineering and Design Management, 17(1-2), pp. 67-76. ISSN 1745-2007
Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.
Rajendran, S (2007) Sustainable construction safety and health rating system. PhD thesis, Oregon State University, USA.
Ramanayaka, C and Rotimi, J (2011) Strategy: Towards its applicability for successful project delivery. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ramanayaka, C D D (2013) Developing a strategy-led approach as a suitable methodology for construction project planning and implementation. PhD thesis, Auckland University of Technology, New Zealand.
Ramanayaka, C D E; Olatunji, O A and Rotimi, J O (2023) Critical success factors of strategy-led planning of high-profile projects. International Journal of Construction Management, 23(1), pp. 75-88. ISSN 1562-3599
Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(2), pp. 253-267. ISSN 1562-3599
Rauscher, Kimberly (2024) Successful strategies government executive stakeholders use to mitigate higher project costs and user adoption failure rates. DBA thesis, Walden University, USA.
Razak, N A (2024) Development of safety leading and lagging indicators framework for contractor selection in construction projects. PhD thesis, University of Manchester, UK.
Renault, B Y; Agumba, J N and Ansary, N (2020) Establishing core factors of risk management influencing performance outcome of small and medium firm's construction projects in Gauteng. Journal of Construction in Developing Countries, 25(2), pp. 93-127. ISSN 1823-6499
Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. PhD thesis, Texas A&M University, USA.
Rose, T and Manley, K (2010) Motivational misalignment on an iconic infrastructure project. Building Research & Information, 38(2), pp. 144-156. ISSN 0961-3218
Rotimi, J O B and Ramanayaka, C D D (2015) Analysis of the influence of a strategy-led planning approach on successful construction project implementation. Construction Economics and Building, 15(2), pp. 13-30. ISSN 2204-9029
Rowings, J E and Kaspar, S L (1991) Constructability of cable-stayed bridges. Journal of Construction Engineering and Management, 117(2), pp. 259-278. ISSN 0733-9364
Ruff, C M; Dzombak, D A and Hendrickson, C T (1996) Owner-contractor relationships on contaminated site remediation projects. Journal of Construction Engineering and Management, 122(4), pp. 348-353. ISSN 0733-9364
Russell, J S and Jaselskis, E J (1992) Quantitative study of contractor evaluation programs and their impact. Journal of Construction Engineering and Management, 118(3), pp. 612-624. ISSN 0733-9364
Russell, J S; Jaselskis, E J and Lawrence, S P (1997) Continuous assessment of project performance. Journal of Construction Engineering and Management, 123(1), pp. 64-71. ISSN 0733-9364
Rwelamila, P D; Talukhaba, A A and Ngowi, A B (1999) Tracing the African project failure syndrome: The significance of 'ubuntu'. Engineering, Construction and Architectural Management, 6(4), pp. 335-346. ISSN 0969-9988
Ryan, Peter William Joseph (2017) Unlocking the key to mega project delivery. PhD thesis, University of Melbourne, Australia.
Sadeghi, B (2024) Selecting Industry 4.0 technologies for construction activities using clustering analysis and text mining. PhD thesis, University of Wisconsin - Milwaukee, USA.
Sadeghi, Neda (2024) Quantifying the impact of time-space conflict on construction project schedules: A task-centric approach. PhD thesis, Texas A&M University, USA.
Sajuyigbe, Ademola Samuel; Ogundare, Olusegun Samuel; Sanusi, Bolanle Mistura; Akinbobola, Abiola Olubunmi; Tella, Adeniran Rahman and Obi, Nwoye James (2026) Assessing the mediating role of project management training on the nexus between job satisfaction and project performance in the Nigerian construction industry. Journal of Construction Business and Management, 8(2), pp. 1-14. ISSN 2521-0165
Salama, M and Habib, A P (2009) Investigating the causes of variation within the construction projects in UAE. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Salari, M; Ghanbari, M; Skitmore, M and Alipour, M (2026) Developing a framework for selecting alternative materials for construction projects using BIM and the particle swarm optimization algorithm. Construction Innovation, 26(3), pp. 745-767. ISSN 1471-4175
Salary, S and Reyes, M (2025) Identifying the impact of preconstruction elements on project budget. Journal of Construction Engineering and Management, 151(6): 04025058, ISSN 0733-9364
Salas, R and Hallowell, M (2016) Predictive validity of safety leading indicators: Empirical assessment in the oil and gas sector. Journal of Construction Engineering and Management, 142(10): 04016052, ISSN 0733-9364
Sami Ur Rehman, M; Shafiq, M T; Ullah, F and Galal Ahmed, K (2023) A critical appraisal of traditional methods of construction progress monitoring. Built Environment Project and Asset Management, 13(6), pp. 830-845. ISSN 2044-124X
Sandhu, M and Helo, P (2006) A network approach to project business analysis. Engineering, Construction and Architectural Management, 13(6), pp. 600-615. ISSN 0969-9988
Sanei, H (2016) Discipline breakdown structure: Bridging project management and systems engineering to form an integrated management system in multidisciplinary rail projects. PhD thesis, University College London, UK.
Sarvari, H; Nassereddine, H; Chan, D W M; Amirkhani, M and Md Noor, N (2021) Determining and assessing the significant barriers of transferring unfinished construction projects from the public sector to the private sector in Iran. Construction Innovation, 21(4), pp. 592-607. ISSN 1471-4175
Saunders, L W (2013) Measuring safety attitude differences in the construction supply chain. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Savolainen, J M; Saari, A; Männistö, A and Kähkonen, K (2018) Indicators of collaborative design management in construction projects. Journal of Engineering, Design and Technology, 16(4), pp. 674-691. ISSN 1726-0531
Sayed Suleiman, R (2019) Understanding site offices challenges to communicate and exchange information using technology in UK: main contractor perspective. PhD thesis, University of Salford, UK.
Schofield, L N (2011) The role of stakeholders in building self-sustaining capacity in housing development projects in marginalised communities: case of Odi and Kaduna South communities in Nigeria. PhD thesis, University of Salford, UK.
Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988
Seng, Hansen (2020) A front end planning decision-making framework for infrastructure project selection and prioritisation in Indonesia. PhD thesis, RMIT University, Australia.
Sergeeva, N (2013) Making sense of innovation in the UK construction sector. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Serraino, P (2024) Teamwork and collaboration: Case studies in architectural practice. PhD thesis, University of California, Berkeley, USA.
Serugga, J (2020) A decision support system for benefits realisation in front end design of construction projects in dynamic contexts. PhD thesis, University of Huddersfield, UK.
Shahedi, F; Etemadfard, H; Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024114, ISSN 0733-9364
Shahtaheri, M; Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(1), pp. 40-60. ISSN 0969-9988
Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships. PhD thesis, University of Maryland, College Park, USA.
Sharma, V; Bapat, P; Garg, S; Degezelle, D and Gajjar, D (2024) Critical project impact factors for federal capital facility projects. Journal of Construction Engineering and Management, 150(10): 04024138, ISSN 0733-9364
She, Ling-Ye (2014) Understanding the conditions of trust between governance and management within project alliancing. PhD thesis, University of Melbourne, Australia.
Shen, W; Tang, W; Wang, Y; Duffield, C F; Hui, F K P and Zhang, L (2021) Managing interfaces in large-scale projects: The roles of formal governance and partnering. Journal of Construction Engineering and Management, 147(7): 04021064, ISSN 0733-9364
Shikhrobat, M B; Kabiri, S and Flanagan, R (2019) Project planning and scheduling using system dynamics for dealing with complexity on construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Shrestha, A; Chan, T K; Aibinu, A A; Chen, C and Martek, I (2018) Risk allocation inefficiencies in Chinese PPP water projects. Journal of Construction Engineering and Management, 144(4): 04018013, ISSN 0733-9364
Shuaib, Salem Mohammed S (2016) Project management performance in Saudi Arabia: An exploratory study into the constructs that most influence project success. PhD thesis, University of Adelaide, Australia.
Siddiquei, Ahmad (2019) An extended model of temporal leadership, team processes, and project team performance. PhD thesis, Bond University, Australia.
Sidney, E E (2019) Evaluating the adoption of project management tools and techniques in private construction companies in Nigeria. PhD thesis, University of Bedfordshire, UK.
Siebelink, Sander (2021) Maturities in building information modelling: A multi-level perspective. PhD thesis, University of Twente, Netherlands.
Singh, D and Tiong, R L K (2006) Contractor selection criteria: Investigation of opinions of Singapore construction practitioners. Journal of Construction Engineering and Management, 132(9), pp. 998-1008. ISSN 0733-9364
Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.
Sinha, S; Kumar, B and Thomson, A (2006) Measuring project complexity: A project manager's tool. Architectural Engineering and Design Management, 2(3), pp. 187-202. ISSN 1745-2007
Slay, Peter Gordon Ronald (2019) Development of an ontology for project management success criteria and associated technical and personal competencies in an Australian engineering context. PhD thesis, University of New South Wales, Australia.
Smyth, H (2016) The business development manager as a value creation worker. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Sowder, Anne Marie (2023) Framework for recovery: The 1935 hurricane houses of islamorada as a case of successful post-disaster rebuilding. PhD thesis, University of Florida, USA.
Stamatiou, D R I; Kirytopoulos, K A; Ponis, S T; Gayialis, S and Tatsiopoulos, I (2019) A process reference model for claims management in construction supply chains: The contractors' perspective. International Journal of Construction Management, 19(5), pp. 382-400. ISSN 1562-3599
Stewart, R A (2003) Lifecycle management of information technology (IT) projects in construction. PhD thesis, Griffith University, Australia.
Strahorn, S; Brewer, G and Gajendran, T (2017) The influence of trust on project management practice within the construction industry. Construction Economics and Building, 17(1), pp. 1-19. ISSN 2204-9029
Styhre, A and Brorström, S (2023) Syndicated leadership in urban development projects: The case of the River City Gothenburg project. Construction Management and Economics, 41(5), pp. 387-401. ISSN 01446193
Sutrisna, M and Goulding, J (2019) Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, Construction and Architectural Management, 26(2), pp. 267-284. ISSN 0969-9988
Swarup, L; Korkmaz, S and Riley, D (2011) Project delivery metrics for sustainable, high-performance buildings. Journal of Construction Engineering and Management, 137(12), pp. 1043-1051. ISSN 0733-9364
Tah, J H M and Carr, V (2000) Information modelling for a construction project risk management system. Engineering, Construction and Architectural Management, 7(2), pp. 107-119. ISSN 0969-9988
Taimu, M (2020) A contractor-driven stakeholder relationship management framework for botswana's construction industry. DBL thesis, University of South Africa, South Africa.
Takim, R; Akintoye, A and Kelly, J (2003) Performance measurement systems in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Tambwe, O T; Aigbavboa, C O and Akinradewo, O (2025) Benefits of construction data risks management in the construction industry. Journal of Engineering, Design and Technology, 23(2), pp. 458-476. ISSN 1726-0531
Tang, P (2013) Assessing decision making strategies in construction management by using a schedule-based simulation framework. PhD thesis, Michigan Technological University, USA.
Tembo, C K (2018) Risk allocation on building projects in the Zambian construction industry. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Tembo Silungwe, C K and Khatleli, N (2020) An analysis of the allocation of pertinent risks in the Zambian building sector using Pareto analysis. International Journal of Construction Management, 20(4), pp. 321-334. ISSN 1562-3599
Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364
Thaheem, Muhammad Jamaluddin (2014) Project risk management for sustainable restoration of immovable cultural heritage: Lessons from construction industry and formulation of a customized prm model. PhD thesis, Politecnico di Torino, Italy.
Thakhtravachi, M (2017) Tacit knowledge integration within the traditional construction procurement system. PhD thesis, University of Salford, UK.
Thomas, A V; Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(4), pp. 407-424. ISSN 01446193
Thomas, S R; Lee, S H; Spencer, J D; Tucker, R L and Chapman, R E (2004) Impacts of design/information technology on project outcomes. Journal of Construction Engineering and Management, 130(4), pp. 586-597. ISSN 0733-9364
Thomas, W K (2013) The impact of RFP phase project scope development on the successful outcome of construction projects using the design build project delivery method. PhD thesis, University of Alabama in Huntsville, USA.
Thomson, C S; El-Haram, M A and Emmanuel, R (2009) Mapping knowledge during sustainability assessment within a PPP school project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Thomson, C S; El-Haram, M A; Hardcastle, C and Horner, R M W (2008) Developing an urban sustainability assessment protocol reflecting the project lifecycle. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Tran, D H (2020) Optimizing time-cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(9), pp. 2287-2313. ISSN 0969-9988
Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364
Tran, Hanh Van (2013) Contractor internal profiling of owners. PhD thesis, University of New South Wales, Australia.
Tribelsky, E and Sacks, R (2011) An empirical study of information flows in multidisciplinary civil engineering design teams using lean measures. Architectural Engineering and Design Management, 7(2), pp. 85-101. ISSN 1745-2007
Udofia, W U; Hadikusumo, B H W and Santoso, D S (2015) Road project termination and rebidding strategies in Nigeria. Journal of Financial Management of Property and Construction, 20(3), pp. 208-234. ISSN 1366-4387
Ullal, A (2023) Construction conditions and practices during war in Afghanistan. Journal of Construction Engineering and Management, 149(5): 05023005, ISSN 0733-9364
Ullal, André (2018) Clear, Hold and Build: Conditions and practices characterising construction in conflict and post-conflict settings. PhD thesis, University of Melbourne, Australia.
Valentin, W S and Vorster, F S (2012) Understanding construction project failure in Southern Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 19-26. ISSN 17514312
Vernikos, V K (2016) Realising offsite construction in the civil engineering and infrastructure sector. PhD thesis, Loughborough University, UK.
Vigneshkumar, C and Salve, U R (2020) A scientometric analysis and review of fall from height research in construction. Construction Economics and Building, 20(1), pp. 17-35. ISSN 2204-9029
Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988
Vines, M P and Egbu, C O (2004) Readiness assessment process protocol for e-business initiatives in construction organisations. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(6), pp. 648-673. ISSN 0969-9988
Walker, D and Lloyd-Walker, B (2011) Knowledge, skills and attributes of project alliances managers in Australasia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Walker, D and Lloyd-Walker, B (2012) Understanding early contractor involvement (ECI) procurement forms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Walker, D H T; Bourne, L M and Shelley, A (2008) Influence, stakeholder mapping and visualization. Construction Management and Economics, 26(6), pp. 645-658. ISSN 1466433X
Wang, H (2021) BIM-based knowledge management for the use of construction and facilities management knowledge in construction projects. PhD thesis, Queen's University Belfast, UK.
Wang, H; Meng, X and McGetrick, P J (2018) Incorporating knowledge of construction and facility management into the design in the BIM environment. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Wang, N; Wang, H and Zhang, K (2022) The dynamics of changes in PPP projects: A meta-case analysis approach. Construction Management and Economics, 40(9), pp. 727-742. ISSN 01446193
Wang, P; Wang, K; Huang, Y; Fenn, P and Stewart, I (2022) Auditing construction cost from an in-process perspective based on a Bayesian predictive model. Journal of Construction Engineering and Management, 148(4): 04022003, ISSN 0733-9364
Wang, T; Tang, W; Qi, D; Shen, W and Huang, M (2016) Enhancing design management by partnering in delivery of international EPC projects: Evidence from Chinese construction companies. Journal of Construction Engineering and Management, 142(4): 04015099, ISSN 0733-9364
Wang, Y (2024) Towards automated contract analysis: Applying language models to risk identification in the context of public-private partnerships. PhD thesis, University of Maryland, College Park, USA.
Wang, Y-R (2002) Applying the PDRI in project risk management. PhD thesis, University of Texas at Austin, USA.
Wang, Zhuoyuan (2019) Effects of main contractors' service quality on subcontractors' behaviours and project outcomes in the Chinese construction industry. PhD thesis, University of New South Wales, Australia.
Waqar, A; Othman, I B and Mansoor, M S (2025) Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: Mediating role of project control. Engineering, Construction and Architectural Management, 32(9), pp. 6095-6114. ISSN 0969-9988
Watermeyer, R B (2012) A framework for developing construction procurement strategy. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 223-237. ISSN 17514312
Weshah, N A (2015) Developing an interface management (im) model for construction projects. PhD thesis, University of Calgary, Canada.
Williams, T J (2020) Relationships between cost estimates, scheduling and project success in the construction sector. PhD thesis, Walden University, USA.
Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193
Williams, T P (2005) Bidding ratios to predict highway project costs. Engineering, Construction and Architectural Management, 12(1), pp. 38-51. ISSN 0969-9988
Winch, G M (2001) Governing the project process: A conceptual framework. Construction Management and Economics, 19(8), pp. 799-808. ISSN 01446193
Windapo, A; Alade, K; Lefoka, M; Lefokotsane, K and Mundoma, T (2024) The role of construction managers' competencies in enhancing project performance. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.
Wong, A K D; Wong, F K W and Nadeem, A (2011) Government roles in implementing building information modelling systems: Comparison between Hong Kong and the United States. Construction Innovation, 11(1), pp. 61-76. ISSN 1471-4175
Wong, A K D and Zhang, R (2013) Implementation of web-based construction project management system in China projects by Hong Kong developers. Construction Innovation, 13(1), pp. 26-49. ISSN 1471-4175
Wood, G D and Ellis, R C T (2005) Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(3), pp. 317-325. ISSN 01446193
Wood, X; Ghimire, P; Kim, S; Barutha, P and Jeong, H D (2024) Framework for evaluating the success of integrated project delivery in the industrial construction sector: A mixed methods approach & machine learning application. Construction Economics and Building, 24(1-2), pp. 94-118. ISSN 2204-9029
Wuni, I Y (2025) Developing a multidimensional risk assessment model for sustainable construction projects. Engineering, Construction and Architectural Management, 32(6), pp. 4155-4173. ISSN 0969-9988
Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333. ISSN 0969-9988
Wuni, I Y; Shen, G Q and Darko, A (2022) Best practices for implementing industrialized construction projects: Lessons from nine case studies. Construction Innovation, 22(4), pp. 915-938. ISSN 1471-4175
Wuni, I Y; Shen, G Q and Osei-Kyei, R (2022) Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2108-2120. ISSN 1562-3599
Xia, N; Wang, X; Wang, Y; Yang, Q and Liu, X (2017) Lifecycle cost risk analysis for infrastructure projects with modified Bayesian networks. Journal of Engineering, Design and Technology, 15(1), pp. 79-103.
Xu, M; Duffield, C and Ma, J (2011) Performance of mid-project reviews (MPRs): Quantification based on fuzzy recognition. Built Environment Project and Asset Management, 1(2), pp. 137-155. ISSN 2044-124X
Xu, Ming (2010) The value of critical project decisions: measurement and modelling. PhD thesis, University of Melbourne, Australia.
Yang, L; Lv, X and Zhao, X (2024) Coping with abnormal organizational behaviors in complex project based on network attack theory. Engineering, Construction and Architectural Management, 31(9), pp. 3773-3800. ISSN 0969-9988
Yang, L R (2007) Exploring the links between technology usage and project outcomes. Construction Management and Economics, 25(10), pp. 1041-1051. ISSN 1466433X
Yap, J. B. H. and Yu, C. Y. (2026) Essential needs and strategies for effective contractor communications: Bridging gaps in malaysia's construction industry. International Journal of Construction Education and Research, 22(2), pp. 284-307. ISSN 1557-8771
Yap, J B H; Lee, K Y; Rose, T and Skitmore, M (2022) Corruption in the Malaysian construction industry: Investigating effects, causes, and preventive measures. International Journal of Construction Management, 22(8), pp. 1525-1536. ISSN 1562-3599
Yap, J B H; Low, P L and Wang, C (2017) Rework in Malaysian building construction: Impacts, causes and potential solutions. Journal of Engineering, Design and Technology, 15(5), pp. 591-618.
Yean, F; Ling, Y and Ang, W T (2013) Using control systems to improve construction project outcomes. Engineering, Construction and Architectural Management, 20(6), pp. 576-588. ISSN 0969-9988
Yu, J and Leung, M Y (2018) Structural stakeholder model in public engagement for construction development projects. Journal of Construction Engineering and Management, 144(6): 04018046, ISSN 0733-9364
Yu, J; Leung, M Y and Jiang, X (2020) Impact of critical factors within decision making process of public engagement and public consultation for construction projects: Case studies. International Journal of Construction Management, 22(12), pp. 2290-2299. ISSN 1562-3599
Yıldırım, A; Genç, O and Aydınlı, S (2026) An examination of the perceptions of occupational work ethics among construction professionals working in the public and private sectors: A factor analysis (fa) and hypothesis testing approach. International Journal of Construction Management, 26(4), pp. 604-620. ISSN 1562-3599
Zangeneh, P (2021) Knowledge representation and artificial intelligence for management of socio-technical risks in megaprojects. PhD thesis, University of Toronto, Canada.
Zedan, S and Miller, W (2018) Quantifying stakeholders' influence on energy efficiency of housing: Development and application of a four-step methodology. Construction Management and Economics, 36(7), pp. 375-393. ISSN 01446193
Zerihun, A; Beza, D and Idrisi, M J (2025) Factors affecting contractor and subcontractor relationship and their effects on building project performance: Case of Addis Ababa. International Journal of Construction Management, 25(14), pp. 1716-1724. ISSN 1562-3599
Zhang, Y.; Guo, Y.; Li, Y. and Wang, M. (2026) ESG practices and megaproject management performance: The roles of environmental dynamism and munificence. Engineering, Construction and Architectural Management, pp. 1-28. ISSN 0969-9988
Zhang, H and Alhashedi, E (2025) Propagation analysis and assessment for the risks in EPC projects. Journal of Construction Engineering and Management, 151(12): 04025209, ISSN 0733-9364
Zhang, L (2002) Engineering performance improvement based on the integration of genetic algorithms and artificial neural networks. PhD thesis, Purdue University, USA.
Zhang, S and Leiringer, R (2016) Owner project capabilities in infrastructure projects: Unpacking commercial capabilities. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Zhang, Xueyan (2024) Integrate blockchain to optimize the prefabrication supply chain management. PhD thesis, Griffith University, Australia.
Zhang, Y (2012) An investigation on cooperative behaviors in the Chinese construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Zhao, J; Thurairajah, N; Greenwood, D; Liu, H and Yuan, J (2023) Unpacking the context of value for money assessment in global markets: A procurement option framework for public-private partnerships. Engineering, Construction and Architectural Management, 30(8), pp. 3583-3601. ISSN 0969-9988
Zighan, S and Abualqumboz, M (2021) A project life-cycle readiness approach to manage construction waste in Jordan. Construction Economics and Building, 21(3), pp. 58-79. ISSN 2204-9029
Zimina, D; Ballard, G and Pasquire, C (2012) Target value design: Using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(5), pp. 383-398. ISSN 1466433X
Zou, J and Zillante, G (2006) Relationship contracting: The South Australian experience: a case study. Construction Economics and Building, 6(2), pp. 20-31. ISSN 2204-9029
Zou, J; Zillante, G and Coffey, V (2009) Project culture in the Chinese construction industry: Perceptions of contractors. Construction Economics and Building, 9(2), pp. 17-28. ISSN 2204-9029
Zou, Y (2017) BIM and knowledge based risk management system. PhD thesis, University of Liverpool, UK.
Zou, Y (2017) Building information modelling and knowledge-based risk management system. PhD thesis, University of Liverpool, UK.
Zuluaga, C M; Albert, A and Winkel, M A (2020) Improving safety, efficiency, and productivity: Evaluation of fall protection systems for bridge work using wearable technology and utility analysis. Journal of Construction Engineering and Management, 146(2): 04019107, ISSN 0733-9364
af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
af Hällström, A and Bosch-Sijtsema, P (2021) The dark side of collaboration: The risks of strong ties in collaborative project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
af Hällström, A; Bosch-Sijtsema, P and Poblete, L (2025) Challenges with collaboration: The interaction of formal and informal ties in infrastructure construction. Construction Management and Economics, 43(1), pp. 7-25. ISSN 0144-6193
Up a level