Items with Subject: procurement capability

Number of items: 27.

Alkass, S; Arouian, A and Moselhi, O (1993) Computer-aided equipment selection for transporting and placing concrete. Journal of Construction Engineering and Management, 119(3), pp. 445-465. ISSN 0733-9364

Alkass, S and Harris, F (1988) Expert system for earthmoving equipment selection in road construction. Journal of Construction Engineering and Management, 114(3), pp. 426-440. ISSN 0733-9364

Alkass, S T (1988) An expert system applied to earthmoving operations and equipment selection. PhD thesis, Loughborough University, UK.

Alshboul, O.; Al-Shboul, K.; Shehadeh, A. and Tatari, O. (2026) Advancing equipment management for construction: Introducing a new model for cost, time and quality optimization. Construction Innovation, 26(4), pp. 1191-1217. ISSN 1471-4175

Alshboul, O (2019) Multi-objective optimization for heavy earthmoving construction equipment management based on time, cost, and pollutant emissions. PhD thesis, University of Central Florida, USA.

Amirkhanian, S N and Baker, N J (1992) Expert system for equipment selection for earth-moving operations. Journal of Construction Engineering and Management, 118(2), pp. 318-331. ISSN 0733-9364

Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364

Cameron, I; Gillan, G and Duff, A R (2007) Issues in the selection of fall prevention and arrest equipment. Engineering, Construction and Architectural Management, 14(4), pp. 363-374. ISSN 0969-9988

Chan, C M R and Harris, F C (1989) A database/spreadsheet application for equipment selection. Construction Management and Economics, 7(3), pp. 235-247. ISSN 01446193

Edwards, D J; Holt, G D and Harris, F C (1998) Financial management of construction plant: Conceptualising cost prediction. Journal of Financial Management of Property and Construction, 3(2), pp. 59-74. ISSN 1366-4387

Elmisalami, T; Walters, R and Jaselskis, E J (2006) Construction IT decision making using multiattribute utility theory for use in a laboratory information management system. Journal of Construction Engineering and Management, 132(12), pp. 1275-1283. ISSN 0733-9364

Farid, F and Koning, T L (1994) Simulation verifies queuing program for selecting loader-truck fleets. Journal of Construction Engineering and Management, 120(2), pp. 386-404. ISSN 0733-9364

Goldenberg, M and Shapira, A (2007) Systematic evaluation of construction equipment alternatives: Case study. Journal of Construction Engineering and Management, 133(1), pp. 72-85. ISSN 0733-9364

Haidar, A; Naoum, S; Howes, R and Tah, J (1999) Genetic algorithms application and testing for equipment selection. Journal of Construction Engineering and Management, 125(1), pp. 32-38. ISSN 0733-9364

Luo, Q.; Sun, C.; Li, G.; Li, Y.; Xue, J. and Zhang, G. (2026) Hierarchical schedule risk structures and mitigation strategies in prefabricated building projects: An integrated SNA-ISM approach. Engineering, Construction and Architectural Management, 33(7), pp. 5737-5759. ISSN 0969-9988

Mahamadu, A-M; Mahdjoubi, L and Booth, C A (2017) Critical BIM qualification criteria for construction pre-qualification and selection. Architectural Engineering and Design Management, 13(5), pp. 326-343. ISSN 1745-2007

Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175

Marzouk, M and Moselhi, O (2002) Simulation optimization for earthmoving operations using genetic algorithms. Construction Management and Economics, 20(6), pp. 535-543. ISSN 01446193

Naoum, S and Haidar, A L I (2000) A hybrid knowledge base system and genetic algorithms for equipment selection. Engineering, Construction and Architectural Management, 7(1), pp. 3-14. ISSN 0969-9988

Patcharachavalit, N; Limsawasd, C and Athigakunagorn, N (2023) Multiobjective optimization for improving sustainable equipment options in road construction projects. Journal of Construction Engineering and Management, 149(1): 04022160, ISSN 0733-9364

Shapira, A and Glascock, J D (1996) Culture of using mobile cranes for building construction. Journal of Construction Engineering and Management, 122(4), pp. 298-307. ISSN 0733-9364

Shapira, A and Goldenberg, M (2005) AHP-based equipment selection model for construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1263-1273. ISSN 0733-9364

Shapira, A and Goldenberg, M (2007) "Soft" considerations in equipment selection for building construction projects. Journal of Construction Engineering and Management, 133(10), pp. 749-760. ISSN 0733-9364

Shaurette, M (2007) Assessment of webcam technology on teaching and learning in construction management education. PhD thesis, Purdue University, USA.

Szamocki, N; Kim, M K; Ahn, C R and Brilakis, I (2019) Reducing greenhouse gas emission of construction equipment at construction sites: Field study approach. Journal of Construction Engineering and Management, 145(9): 05019012, ISSN 0733-9364

Touran, A; Sheahan, T C and Ozcan, E (1997) Rational equipment selection method based on soil conditions. Journal of Construction Engineering and Management, 123(1), pp. 85-88. ISSN 0733-9364

Wuni, I Y; Shen, G Q and Saka, A B (2023) Computing the severities of critical onsite assembly risk factors for modular integrated construction projects. Engineering, Construction and Architectural Management, 30(5), pp. 1864-1882. ISSN 0969-9988

This list was generated on Sat Aug 22 02:37:10 2026 UTC.