Items with Subject: prediction and forecasting
A. Mohy, A.; Bassioni, H. A.; Elgendi, E. O. and Hassan, T. M. (2026) Modeling spatiotemporal hazard dynamics for construction safety using graph attention networks. Journal of Engineering, Design and Technology, ISSN 1726-0531
Abbasnejad, B; Nasirian, A; Duan, S; Diro, A; Prasad Nepal, M and Song, Y (2024) Measuring BIM implementation: A mathematical modeling and artificial neural network approach. Journal of Construction Engineering and Management, 150(5): 04024032, ISSN 0733-9364
Abdallah, A M (2021) A study on bridge inspections: Identifying barriers to new practices and providing strategies for change. PhD thesis, Colorado State University, USA.
Abdelazeem, A S and Ibrahim, A H (2022) Evaluation of project cost and schedule performance using fuzzy theory-based polynomial function. International Journal of Construction Management, 22(13), pp. 2564-2576. ISSN 1562-3599
Abdelshafy, A and Walther, G (2023) Using dynamic-locational material flow analysis to model the development of urban stock. Building Research & Information, 51(1), pp. 5-20. ISSN 0961-3218
Abdolrezaei, H; Siahkali, H and Olamaei, J (2021) Coordination of similar days and multi-objective posterior process to predict energy of transmission substation. Journal of Engineering, Design and Technology, 19(6), pp. 1556-1585. ISSN 1726-0531
Abdou, A; Lewis, J and Alzarooni, S (2004) Modelling risk for construction cost estimating and forecasting: A review. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193
Abdullah, R Z (1988) Integrated systems for site management. PhD thesis, Loughborough University, UK.
Abdulmajid, S A D (1967) Resource forecasting models for private housing projects. PhD thesis, University of Manchester, UK.
Abotaleb, I S and El-Adaway, I H (2018) First attempt toward a holistic understanding of the interdependent rippled impacts associated with out-of-sequence work in construction projects: System dynamics modeling approach. Journal of Construction Engineering and Management, 144(9): 04018084, ISSN 0733-9364
Abounia Omran, B (2016) Application of data mining and big data analytics in the construction industry. PhD thesis, Ohio State University, USA.
Abu Dabous, S; Alzghoul, A and Ibrahim, F (2025) Intelligent condition prediction model for bridge infrastructure based on evaluating machine learning algorithms. Smart and Sustainable Built Environment, 14(2), pp. 557-576. ISSN 2046-6099
Abu-Mahfouz, E; Al-Dahidi, S; Gharaibeh, E and Alahmer, A (2025) A novel feature engineering-based hybrid approach for precise construction cost estimation using fuzzy-AHP and artificial neural networks. International Journal of Construction Management, 25(15), pp. 1800-1810. ISSN 1562-3599
Abudu, H. D.; Mewomo, M. C.; Adjei, K. O. and Bondinuba, F. K. (2026) An emergency response framework for improving crisis management in facilities: PLS-SEM approach. International Journal of Disaster Resilience in the Built Environment, ISSN 1759-5908
Abutabenjeh, S A (2014) The impacts of in-state procurement preference policies on the economy of South Carolina. PhD thesis, Old Dominion University, USA.
Adafin, J; Rotimi, J O B; Wilkinson, S and Mbachu, J (2019) An assessment of risk factors impacting budget variability in New Zealand commercial construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Adams, B J (1977) A study of the feasibility of using forecasting models to characterize the supply of contract construction labor. PhD thesis, Texas A&M University, USA.
Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2025) An analytical approach to understanding construction cost overruns during COVID-19. Smart and Sustainable Built Environment, 14(6), pp. 1780-1794. ISSN 2046-6099
Adul-Hamid, R (1996) Construction duration prediction using neural network methodology. PhD thesis, University of Manchester, UK.
Agapiou, A (1996) Forecasting the supply of construction labour. PhD thesis, Loughborough University, UK.
Agapiou, A; Price, A and McCaffer, R (1995) Forecasting the supply of construction skills in the UK. Construction Management and Economics, 13(4), pp. 353-364. ISSN 01446193
Agbo, E A; Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), pp. 109-125. ISSN 1823-6499
Agdas, D (2008) Corporate-level management system for critical strategic resources for large construction program managers. PhD thesis, University of Florida, USA.
Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364
Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193
Agyekum, B; Kissi, E; Yamoah Agyemang, D and Badu, E (2018) Examining barriers for the utilization of non-traditional cost estimating models in developing countries: Ghanaian quantity surveyors' perspectives. Journal of Engineering, Design and Technology, 16(6), pp. 814-827. ISSN 1726-0531
Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.
Ahiaga-Dagbui, D and Smith, S D (2012) Neural networks for modelling the final target cost of water projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193
Ahmed, A L (2019) Development of conceptual constructs for organisational BIM adoption and their systematic application within the UK architecture sector. PhD thesis, University of Sheffield, UK.
Akbari, S; Khanzadi, M and Gholamian, M R (2018) Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index. Engineering, Construction and Architectural Management, 25(4), pp. 534-558. ISSN 0969-9988
Akbari, S; Pour Rahimian, F; Sheikhkhoshkar, M; Banihashemi, S and Khanzadi, M (2020) Dynamic sustainable success prediction model for infrastructure projects: a rough set based fuzzy inference system. Construction Innovation, 20(4), pp. 545-567. ISSN 1471-4175
Akintoye, A; Bowen, P and Hardcastle, C (1998) Macro-economic leading indicators of construction contract prices. Construction Management and Economics, 16(2), pp. 159-175. ISSN 01446193
Akintoye, A and Skitmore, M (1994) Models of UK private sector quarterly construction demand. Construction Management and Economics, 12(1), pp. 3-13. ISSN 01446193
Akintoye, S A (1991) Construction tender price index: modelling and forecasting trends. PhD thesis, University of Salford, UK.
Akintoye, S A and Skitmore, R M (1994) A comparative analysis of three macro price forecasting models. Construction Management and Economics, 12(3), pp. 257-270. ISSN 01446193
Al-Amin, Md (2023) Pavement maintenance and rehabilitation programming and budget allocation from strategic perspectives: Multiobjective optimization models. PhD thesis, University of Texas at Austin, USA.
Al-Aomar, R; AlTal, M and Abel, J (2024) A data-driven predictive maintenance model for hospital HVAC system with machine learning. Building Research & Information, 52(1-2), pp. 207-224. ISSN 0961-3218
Al-Gahtani, K; Alsugair, A; Alsanabani, N; Alabduljabbar, A and Almutairi, B (2024) Forecasting delay-time model for Saudi construction projects using DEMATEL–sd technique. International Journal of Construction Management, 24(11), pp. 1225-1239. ISSN 1562-3599
Al-Jibouri, S and Mawdesley, M J (2001) Development and application of a stochastic based cost prediction model for construction. Journal of Financial Management of Property and Construction, 6(1), pp. 61-69. ISSN 1366-4387
Al-Smadi, H; Al-Sakkaf, A; Zayed, T and Nasiri, F (2023) An integrated space-based building maintenance management model using multi-objective optimization. Smart and Sustainable Built Environment, 12(2), pp. 277-297. ISSN 2046-6099
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics, 23(4), pp. 423-430. ISSN 01446193
Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(4), pp. 1136-1157. ISSN 1726-0531
Al-Tabtabai, H (1992) Judgemental forecasting in construction projects. Construction Management and Economics, 10(1), pp. 19-30. ISSN 01446193
Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988
Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.
AlBughdadi, A J M (2022) Advanced decision support tools for bridge asset management. PhD thesis, Iowa State University, USA.
Alaka, H; Oyedele, L; Toriola-Coker, O; Owolabi, H; Akinade, O; Bilal, M and Ajayi, S (2015) Methodological approach of construction businesses failure prediction studies: A review. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Alaka, H A (2017) 'Big data analytics' for construction firms insolvency prediction models. PhD thesis, University of the West of England, Bristol, UK.
Alaka, H A; Oyedele, L O; Owolabi, H A; Ajayi, S O; Bilal, M and Akinade, O O (2016) Methodological approach of construction business failure prediction studies: A review. Construction Management and Economics, 34(11), pp. 808-842. ISSN 01446193
Alaka, H A; Oyedele, L O; Owolabi, H A; Oyedele, A A; Akinade, O O; Bilal, M and Ajayi, S O (2017) Critical factors for insolvency prediction: Towards a theoretical model for the construction industry. International Journal of Construction Management, 17(1), pp. 25-49. ISSN 1562-3599
Alasad, R; Motawa, I and Ogunlana, S (2012) A system dynamics-based method for demand forecasting in infrastructure projects: A case of PPP projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Aleithawe, I (2010) Acquisition of right of way for highway construction. PhD thesis, Mississippi State University, USA.
Aleithawe, I; Sinno, R R and McAnally, W H (2012) Right-of-way acquisition duration prediction model for highway construction projects. Journal of Construction Engineering and Management, 138(4), pp. 540-544. ISSN 0733-9364
Alemu, S K (2022) Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(5), pp. 2183-2206. ISSN 0969-9988
Alexander, D; Hallowell, M and Gambatese, J (2017) Precursors of construction fatalities. II: Predictive modeling and empirical validation. Journal of Construction Engineering and Management, 143(7): 04017024, ISSN 0733-9364
Alharbi, E A and Alsehaimi, A (2025) Machine learning model to predict the cooling load of mosque buildings during the design stage. International Journal of Construction Management, 25(8), pp. 965-979. ISSN 1562-3599
Alhosani, Y (2017) An empirical investigation of the demographics of top management team (TMT) and its influence in forecasting organizational outcome in international architecture, engineering and construction (AEC) firms: A fuzzy set approach. DEng thesis, Ecole de Technologie Superieure, Canada.
Ali, A S and Au-Yong, C P (2022) Risk factors in the refurbishment design process: The case of Malaysia. International Journal of Building Pathology and Adaptation, 40(4), pp. 622-635. ISSN 23984708
Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364
Allahaim, Fahad Saud Abdulaziz (2015) Improving cost contingency estimation for infrastructure projects based on the impact of cost overrun causes of similar projects – illustration using Saudi Arabia survey data. PhD thesis, University of Sydney, Australia.
Almohssen, Abdulaziz (2018) A new methodology for tracking the performance of subcontractors in the construction industry. PhD thesis, University of New South Wales, Australia.
Alqershy, M T and Kishore, R (2023) Construction claims prediction using ann models: A case study of the Indian construction industry. International Journal of Construction Management, 23(6), pp. 1097-1108. ISSN 1562-3599
Alshboul, O; Shehadeh, A; Al-Kasasbeh, M; Al Mamlook, R E; Halalsheh, N and Alkasasbeh, M (2022) Deep and machine learning approaches for forecasting the residual value of heavy construction equipment: A management decision support model. Engineering, Construction and Architectural Management, 29(10), pp. 4153-4176. ISSN 0969-9988
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Altalhoni, A; Liu, H; Abudayyeh, O; Kwigizile, V; Huang, W C and Kirkpatrick, K (2025) Robust forecasting models for highway construction cost indices during pandemic-era inflation. Journal of Construction Engineering and Management, 151(8): 04025101, ISSN 0733-9364
Alves, J. L.; Almeida Filho, A. T. D.; Bradaschia, F. and Palha, R. P. (2026) Solarisbim.AI: Smart sustainable building planning with BIM-based solar-production estimation using machine-learning radiation forecasts. Journal of Construction Engineering and Management, 152(6): 04026076, ISSN 0733-9364
Alzubi, Y; Aljaafreh, A and Khatatbeh, A (2024) Application of machine learning techniques in estimating the construction cost of residential buildings in the middle East region. International Journal of Construction Management, 24(9), pp. 946-958. ISSN 1562-3599
Amadi, A I (2021) A back-end view to climatic adaptation: Partitioning weather-induced cement demand variance in wet humid environment. International Journal of Building Pathology and Adaptation, 39(2), pp. 153-174. ISSN 23984708
Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.
Amuda Yusuf, G and Mohamed, S F (2014) Perceived benefits of adopting standard: based pricing mechanism for mechanical and electrical services installations. Construction Economics and Building, 14(2), pp. 104-119. ISSN 2204-9029
Amuda-Yusuf, G (2018) Critical success factors for building information modelling implementation. Construction Economics and Building, 18(3), pp. 55-73. ISSN 2204-9029
Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364
Andalib, M (2026) Predictive modelling for contract selection in construction through data mining and machine learning: Insights from agency theory. International Journal of Construction Education and Research, 22(1), pp. 138-163. ISSN 1557-8771
Andalib, R; Hoseini, A and Gatmiri, B (2018) A stochastic model of cash flow forecasting considering delays in owners' payments. Construction Management and Economics, 36(10), pp. 545-564. ISSN 01446193
Annamalaisami, C D and Kuppuswamy, A (2022) Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6), pp. 1079-1089. ISSN 1562-3599
Anumba, C; Dainty, A R J; Ison, S G and Sergeant, A (2005) The application of GIS to construction labour market planning. Construction Innovation, 5(4), pp. 219-230. ISSN 1471-4175
Arida, M A (2024) Enhancing thermal comfort in commercial buildings: Contributions of machine learning algorithms for optimizing predictive thermal comfort indices. PhD thesis, North Carolina Agricultural and Technical State University, USA.
Ashrafi, R M (1981) Risk analysis in management planning and project control: probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty. PhD thesis, University of Bradford, UK.
Ashuri, B and Lu, J (2010) Time series analysis of ENR construction cost index. Journal of Construction Engineering and Management, 136(11), pp. 1227-1237. ISSN 0733-9364
Ashuri, B; Shahandashti, S M and Lu, J (2012) Empirical tests for identifying leading indicators of ENR construction cost index. Construction Management and Economics, 30(11), pp. 917-927. ISSN 1466433X
Asiedu, R O; Frempong, N K and Alfen, H W (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(1), pp. 21-39. ISSN 0969-9988
Asiedu, R O; Frempong, N K and Nani, G (2016) Parametric time overrun estimation of building projects. Journal of Financial Management of Property and Construction, 21(3), pp. 253-268. ISSN 1366-4387
Assaf, S A-E (1982) A systematic approach to the selection of a risk retention level for construction insurance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Atapattu, C N; Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(3), pp. 388-404. ISSN 1366-4387
Awad, A and Fayek, A R (2013) Adaptive learning of contractor default prediction model for surety bonding. Journal of Construction Engineering and Management, 139(6), pp. 694-704. ISSN 0733-9364
Awad, A L S (2012) Intelligent contractor default prediction model for surety bonding in the construction industry. PhD thesis, University of Alberta, Canada.
Awe, O O; Atofarati, E O; Adeyinka, M O; Musa, A P and Onasanya, E O (2024) Assessing the factors affecting building construction collapse casualty using machine learning techniques: A case of Lagos, Nigeria. International Journal of Construction Management, 24(3), pp. 261-269. ISSN 1562-3599
Aydinli, S (2024) Impact of unexpected conditions on construction cost forecasting performance: evidence from Europe. Construction Management and Economics, 42(9), pp. 787-801. ISSN 01446193
Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.
Ayhan, M (2019) Development of dispute prediction and resolution method selection models for construction disputes. PhD thesis, Middle East Technical University, Turkey.
Azadeh, A; Kalantari, M; Ahmadi, G and Eslami, H (2019) A flexible genetic algorithm-fuzzy regression approach for forecasting: The case of bitumen consumption. Construction Innovation, 19(1), pp. 71-88. ISSN 1471-4175
Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099
Bai, S; Li, M; Lu, Q; Tian, H and Qin, L (2022) Global time optimization method for dredging construction cycles of trailing suction hopper dredger based on grey system model. Journal of Construction Engineering and Management, 148(2): 04021198, ISSN 0733-9364
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Cerezo-Narváez, A; Lucko, G; Pastor-Fernández, A; Otero-Mateo, M and Contreras-Samper, J P (2020) Forecasting accuracy of in-progress activity duration and cost estimates. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364
Ballesteros-Pérez, P and Skitmore, M (2016) Estimating the number of new and repeated bidders in construction auctions. Construction Management and Economics, 34(12), pp. 919-934. ISSN 01446193
Ballesteros-Pérez, P and Skitmore, M (2017) On the distribution of bids for construction contract auctions. Construction Management and Economics, 35(3), pp. 106-121. ISSN 01446193
Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; González-Cruz, M C; Pastor-Fernández, A and Otero-Mateo, M (2021) Standard deviation of bids for construction contract auctions. Journal of Construction Engineering and Management, 147(8): 04021096, ISSN 0733-9364
Ballesteros-Pérez, P; Skitmore, M; Sanz-Ablanedo, E and Verhoeven, P (2019) Forecasting the number and distribution of new bidders for an upcoming construction auction. Journal of Construction Engineering and Management, 145(10): 040190561, ISSN 0733-9364
Bambrah, G K (1989) A systematic approach to appraisal/evaluation of civil engineering projects, with special emphasis on technology. PhD thesis, Loughborough University, UK.
Baqerin, M H; Shafahi, Y and Kashani, H (2016) Application of Weibull analysis to evaluate and forecast schedule performance in repetitive projects. Journal of Construction Engineering and Management, 142(2): 04015058, ISSN 0733-9364
Barnes, N M L (1971) The design and use of experimental bills of quantities for civil engineering contracts. PhD thesis, University of Manchester, UK.
Barraza, G A; Back, W E and Mata, F (2004) Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25-32. ISSN 0733-9364
Barraza, G A and Bueno, R A (2007) Probabilistic control of project performance using control limit curves. Journal of Construction Engineering and Management, 133(12), pp. 957-965. ISSN 0733-9364
Barrientos-Orellana, A; Ballesteros-Pérez, P; Mora-Melia, D; González-Cruz, M C and Vanhoucke, M (2022) Stability and accuracy of deterministic project duration forecasting methods in earned value management. Engineering, Construction and Architectural Management, 29(3), pp. 1449-1469. ISSN 0969-9988
Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.
Batselier, J and Vanhoucke, M (2015) Empirical evaluation of earned value management forecasting accuracy for time and cost. Journal of Construction Engineering and Management, 141(11): 05015010, ISSN 0733-9364
Bayram, S and Al-Jibouri, S (2016) Efficacy of estimation methods in forecasting building projects' costs. Journal of Construction Engineering and Management, 142(11): 05016012, ISSN 0733-9364
Bayram, S and Al-Jibouri, S (2018) Cost forecasting using RCF: A case study for planning public building projects costs in Turkey. International Journal of Construction Management, 18(5), pp. 405-417. ISSN 1562-3599
Bee-Hua, G (1999) An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore. Construction Management and Economics, 17(2), pp. 231-241. ISSN 01446193
Bee-Hua, G (2000) Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: The case of the Singapore residential sector. Construction Management and Economics, 18(2), pp. 209-217. ISSN 01446193
Bender, W J (2000) A risk-based cost control methodology for constructing complex structures with the mobile offshore base as a case study. PhD thesis, University of Maryland, College Park, USA.
Bentil, K K (1990) A model approach for predicting commercial construction site accidents. PhD thesis, University of Florida, USA.
Bernie, J and Howes, R (1983) Project management control using real-time budgeting and forecasting models. Construction Papers, 2(1), pp. 19-40. ISSN 0144-8587
Berny, J (1988) Forecasting and risk analysis applied to management planning and control. PhD thesis, Aston University, UK.
Bhargava, A; Anastasopoulos, P C; Labi, S; Sinha, K C and Mannering, F L (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), pp. 1207-1218. ISSN 0733-9364
Bhaumik, P K (2016) Developing and using a new family of project S-curves using early and late shape parameters. Journal of Construction Engineering and Management, 142(12): 04016076, ISSN 0733-9364
Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364
Blyth, K and Kaka, A (2006) A novel multiple linear regression model for forecasting S-curves. Engineering, Construction and Architectural Management, 13(1), pp. 82-95. ISSN 0969-9988
Blyth, K; Lewis, J and Kaka, A (2004) Predicting project and activity duration for buildings in the UK. Journal of Construction Research, 5(2), pp. 329-347. ISSN 1609-9451
Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.
Boo, J H S (2001) Improving the accuracy of approximate estimates of building projects. Building Research & Information, 29(4), pp. 312-318. ISSN 0961-3218
Bortey, L; Edwards, D J; Roberts, C and Rillie, I (2025) Unravelling incipient accidents: A machine learning prediction of incident risks in highway operations. Smart and Sustainable Built Environment, 14(6), pp. 1991-2022. ISSN 2046-6099
Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The batalha monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708
Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The Batalha Monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708
Boussabaine, A H (2001) Neurofuzzy modelling of construction projects' duration I: Principles. Engineering, Construction and Architectural Management, 8(2), pp. 104-113. ISSN 0969-9988
Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218
Boussabaine, A H and Kaka, A P (1998) A neural networks approach for cost flow forecasting. Construction Management and Economics, 16(4), pp. 471-479. ISSN 01446193
Boussabaine, A H and Kirkham, R J (2004) Simulation of maintenance costs in UK local authority sport centres. Construction Management and Economics, 22(10), pp. 1011-1020. ISSN 01446193
Boussabaine, A H; Thomas, R and Elhag, T M S (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management, 6(3), pp. 213-224. ISSN 0969-9988
Bowen, P.; Govender, R.; Edwards, P. and Cattell, K. (2015) Tested or not? A categorical examination of HIV/AIDS testing among workers in the South African construction industry. Journal of Construction Engineering and Management, 141(12): 04015040, ISSN 0733-9364
Bowen, P; Edwards, P; Lingard, H and Cattell, K (2014) Predictive modeling of workplace stress among construction professionals. Journal of Construction Engineering and Management, 140(3): 4013055, ISSN 0733-9364
Bowen, P; Govender, R; Edwards, P and Cattell, K (2014) Workplace stress in the construction industry: An explanatory model. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Bowen, P; Govender, R; Edwards, P and Cattell, K (2015) Tested or not? a categorical examination of HIV/AIDS testing among workers in the South African construction industry. Journal of Construction Engineering and Management, 141(12): 04015040, ISSN 0733-9364
Bowen, P; Govender, R; Edwards, P and Cattell, K (2016) An explanatory model of attitudinal fear of HIV/AIDS testing in the construction industry. Engineering, Construction and Architectural Management, 23(1), pp. 92-112. ISSN 0969-9988
Bowen, P; Govender, R; Edwards, P; Cattell, K and Street, A (2015) Factors determining South African construction workers' prejudice towards and discrimination against HIV+ persons. Journal of Construction Engineering and Management, 141(7): 4015014, ISSN 0733-9364
Bowen, P; Yakubu, K and Govender, R (2022) Predictors of moderate to high risk of alcohol harm among site-based South African construction workers. Construction Management and Economics, 40(6), pp. 442-458. ISSN 01446193
Bowen, P A (1993) A communication-based approach to price modelling and price forecasting in the design phase of the traditional building procurement process in South Africa. Unpublished PhD thesis, University of Port Elizabeth, South Africa.
Bowen, P A and Edwards, P J (1985) Cost modelling and price forecasting: Practice and theory in perspective. Construction Management and Economics, 3(3), pp. 199-215. ISSN 01446193
Bowen, P A; Govender, R; Edwards, P J and Cattell, K (2014) An integrated model of HIV/AIDS testing behaviour in the construction industry. Construction Management and Economics, 32(11), pp. 1106-1129. ISSN 01446193
Briscoe, G (2008) Studies of the UK labour market with special reference to the construction sector. PhD thesis, Coventry University, UK.
Brown, B H J (1974) An econometric forecasting model for a segment of the construction market. PhD thesis, Oklahoma State University, USA.
Calvert, G S (2021) A multiple defect approach to bridge life cycle modelling. PhD thesis, University of Nottingham, UK.
Cantarelli, C C (2011) Cost overruns in large-scale transport infrastructure projects: A theoretical and empirical exploration for the Netherlands and worldwide. PhD thesis, Delft University of Technology, Netherlands.
Cao, M T; Cheng, M Y and Wu, Y W (2015) Hybrid computational model for forecasting Taiwan construction cost index. Journal of Construction Engineering and Management, 141(4): 04014089, ISSN 0733-9364
Capano, C D (2007) Construction operations analysis for development of historical cost databases. PhD thesis, Marquette University, USA.
Carmo, Cristiano Saad Travassos do (2023) A hybrid solution using stochastic and neural networks modeling for the consideration of safety uncertainties in construction planning methods. PhD thesis, Pontifícia Universidade Católica do Rio de Janeiro, Brazil.
Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.
Chan, A P C; Chiang, Y H; Mak, S W K; Choy, L H T and James, M W W (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(1), pp. 3-19. ISSN 1471-4175
Chan, A P C; Wong, J M W and Chiang, Y H (2003) Modelling labour demand at project level: An empirical study in Hong Kong. Journal of Engineering, Design and Technology, 1(2), pp. 135-150. ISSN 1726-0531
Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.
Chang, C J and Yu, S W (2018) Three-variance approach for updating earned value management. Journal of Construction Engineering and Management, 144(6): 04018045, ISSN 0733-9364
Chang, S; Castro-Lacouture, D and Yamagata, Y (2020) Estimating building electricity performance gaps with internet of things data using Bayesian multilevel additive modeling. Journal of Construction Engineering and Management, 146(12): 05020017, ISSN 0733-9364
Charkhakan, M H and Heravi, G (2023) Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(5), pp. 1932-1950. ISSN 0969-9988
Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988
Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988
Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364
Chen, H L (2009) Model for predicting financial performance of development and construction corporations. Journal of Construction Engineering and Management, 135(11), pp. 1190-1200. ISSN 0733-9364
Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364
Chen, H-L (2002) Development of a systematic integration approach for multi-level cost flow prediction and management. PhD thesis, University of Florida, USA.
Chen, J-H (2003) Litigation prediction model for construction disputes caused by change orders. PhD thesis, University of Wisconsin - Madison, USA.
Chen, N; Zhang, Z and Chen, A (2025) Comprehensive evaluation of classification: an empirical study on consequence prediction of construction accidents in China. Construction Innovation, 25(4), pp. 1210-1230. ISSN 1471-4175
Chen, X; Zhang, Y; Zhao, B and Yang, S (2021) Investment probabilistic interval estimation for construction project using the hybrid model of SVR and GWO. Journal of Construction Engineering and Management, 147(5): 04021031, ISSN 0733-9364
Cheng, M. Y.; Khitam, A. F. K.; Vu, Q. T. and Widjaja, D. D. (2026) Satellite-inspired time-frequency deep learning for predicting and assessing financial health in general contractors. Journal of Construction Engineering and Management, 152(8): 04026120, ISSN 0733-9364
Cheng, M. Y.; Sholeh, M. N. and Poetra, B. A. (2026) Predicting the construction cost-time tradeoff using optimized hybrid deep learning for risk preference decision making. International Journal of Construction Management, 26(10), pp. 2018-2044. ISSN 1562-3599
Cheng, M. Y. and Vu, Q. T. (2026) Bidirectional revolving gate Fourier transform: A newly spectrum deep machine learning for enhancing construction worker safety classification. Engineering, Construction and Architectural Management, pp. 1-28. ISSN 0969-9988
Cheng, M. Y. and Vu, Q. T. (2026) Bidirectional revolving gate Fourier transform: A newly spectrum deep machine learning for enhancing construction worker safety classification. Engineering, Construction and Architectural Management, pp. 1-28. ISSN 0969-9988
Cheng, M Y; Vu, Q T; Dessalegn, M and Chen, J H (2025) Time-dependent rebar price prediction for procurement decision-making using bio-optimized deep machine learning. Engineering, Construction and Architectural Management, 32(12), pp. 7938-7971. ISSN 0969-9988
Cheng, E W L; Li, H; Shen, L Y and Fong, P S W (2002) Ranking of construction information for various functions of the general contractors: A preliminary study. Journal of Construction Research, 3(1), pp. 181-191. ISSN 1609-9451
Cheng, L and Cao, D (2024) Evolution model and quantitative assessment of risk network in housing construction accidents. Engineering, Construction and Architectural Management, 31(1), pp. 227-246. ISSN 0969-9988
Cheng, M Y; Chang, Y H and Korir, D (2019) Novel approach to estimating schedule to completion in construction projects using sequence and nonsequence learning. Journal of Construction Engineering and Management, 145(11): 04019072, ISSN 0733-9364
Cheng, Y M; Yu, C H and Wang, H T (2011) Short-interval dynamic forecasting for actual S-curve in the construction phase. Journal of Construction Engineering and Management, 137(11), pp. 933-941. ISSN 0733-9364
Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited. PhD thesis, Queensland University of Technology, Australia.
Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(4), pp. 391-405. ISSN 01446193
Cheung, S; Wong, P S P; Fung, A Y S and Coffey, W V (2008) Examining the use of bid information in predicting the contractor's performance. Journal of Financial Management of Property and Construction, 13(2), pp. 111-122. ISSN 1366-4387
Chew, M Y L and Tan, S S (2004) A multivariate approach to maintenance prediction of wet areas. Construction Management and Economics, 22(4), pp. 395-407. ISSN 01446193
Cho, Sung Eun (2025) Machine learning approaches for improving construction materials and pavement systems. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Choi, C Y; Ryu, K R and Shahandashti, M (2021) Predicting city-level construction cost index using linear forecasting models. Journal of Construction Engineering and Management, 147(2): 0001973, ISSN 0733-9364
Choi, J (2003) Strategic motives underlying M and A transactions in the United States public construction industry. PhD thesis, University of Wisconsin - Madison, USA.
Choi, S; Kim, D Y; Han, S H and Kwak, Y H (2014) Conceptual cost-prediction model for public road planning via rough set theory and case-based reasoning. Journal of Construction Engineering and Management, 140(1): 04013026, ISSN 0733-9364
Choudhury, I (2009) The effect of political unrest on construction time for food grain warehouses in Bangladesh. Construction Management and Economics, 27(7), pp. 619-624. ISSN 1466433X
Cirilovic, J; Vajdic, N; Mladenovic, G and Queiroz, C (2014) Developing cost estimation models for road rehabilitation and reconstruction: Case study of projects in Europe and Central Asia. Journal of Construction Engineering and Management, 140(3): 4013065, ISSN 0733-9364
Clarke, R N (1988) A managerial approach to forecasting for the construction industry. PhD thesis, Queen's University Belfast, UK.
Cromie, S I (1992) Forecasting the demand for aggregates in England and Wales, the role of forecasts of demand in the aggregate planning system. PhD thesis, University of Dundee, UK.
Dabirian, S; Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(3), pp. 1201-1221. ISSN 0969-9988
Daniel, C and Neufville, E K (2025) An autogluon-enabled robust machine learning model for concrete tensile and compressive strength forecast. International Journal of Construction Management, 25(13), pp. 1636-1647. ISSN 1562-3599
Daoud, A O; KhairEldin, M; Ibrahim, A H and Toma, H M (2026) Adaptive neuro-fuzzy inference system for Egyptian residential construction waste prediction. International Journal of Construction Management, 26(6), pp. 1059-1077. ISSN 1562-3599
Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193
Dawood, N N (1996) A strategy for a computer-based materials management system for the building industry. Journal of Financial Management of Property and Construction, 1(2), pp. 17-28. ISSN 1366-4387
Dawood, N N (2000) Forecasting of cost indices in the Greek construction industry: A joint methodology approach. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Dawood, N N (2001) Development of a forecasting methodology for cost indices: An application to the Greek construction industry. Journal of Construction Procurement, 7(1), pp. 42-50. ISSN 1358-9180
Dawood, N N and Bates, W (1998) Forecasting indices for construction activities in the heavy civil engineering industry: A joint approach methodology. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Dawood, N N and Bates, W (2000) A decision support system specification for out-turn cost and cost escalation in the heavy engineering industry. Engineering, Construction and Architectural Management, 7(4), pp. 330-346. ISSN 0969-9988
Dawood, N N and Neale, R H (1990) A survey of current production planning practices in the precast concrete industry. Construction Management and Economics, 8(4), pp. 365-383. ISSN 01446193
Dawood, N N and Neale, R H (1993) Forecasting the sales of precast concrete building products. Construction Management and Economics, 11(2), pp. 81-98. ISSN 01446193
De Marco, A; Narbaev, T; Ottaviani, F M and Vanhoucke, M (2024) Influence of cost contingency management on project estimates at completion. International Journal of Construction Management, 24(9), pp. 935-945. ISSN 1562-3599
Delaney, F T (2003) Effectiveness of mergers and acquisitions and corporate financial performance in construction. PhD thesis, Edinburgh Napier University, UK.
Demirkesen, S (2024) Prediction of number of insured having work accident in Turkish construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 193-206. ISSN 17514304
Dietzenbacher, E and Hoen, A (2006) Coefficient stability and predictability in input-output models: A comparative analysis for the Netherlands. Construction Management and Economics, 24(7), pp. 671-680. ISSN 1466433X
Dikmen, I and Birgonul, M T (2004) Neural network model to support international market entry decisions. Journal of Construction Engineering and Management, 130(1), pp. 59-66. ISSN 0733-9364
Dikmen, I; Birgonul, M T and Kiziltas, S (2005) Prediction of organizational effectiveness in construction companies. Journal of Construction Engineering and Management, 131(2), pp. 252-261. ISSN 0733-9364
Do, Q; Moriyani, M A; Le, T; Le, C and Piratla, K (2025) Enhanced highway project clustering framework to support project cost estimation. Journal of Construction Engineering and Management, 151(1): 04024191, ISSN 0733-9364
Doğan, S Z (2005) Using machine learning techniques for early cost prediction of structural systems of buildings. PhD thesis, Izmir Institute of Technology, Turkey.
Dowse, G (2003) Qualitative residential market forecasts: The Auckland experience. Journal of Financial Management of Property and Construction, 8(3), pp. 193-201. ISSN 1366-4387
Doǧan, S Z; Arditi, D and Murat Günaydin, H (2006) Determining attribute weights in a CBR model for early cost prediction of structural systems. Journal of Construction Engineering and Management, 132(10), pp. 1092-1098. ISSN 0733-9364
Doǧan, S Z; Arditi, D and Murat Günaydin, H (2008) Using decision trees for determining attribute weights in a case-based model of early cost prediction. Journal of Construction Engineering and Management, 134(2), pp. 146-152. ISSN 0733-9364
Du, J J; Zhou, J; Liu, C and Picken, D (2006) Exploring turnover intention of construction managers in China. Journal of Construction Research, 7(1), pp. 191-205. ISSN 1609-9451
Dursun, O and Stoy, C (2016) Conceptual estimation of construction costs using the multistep ahead approach. Journal of Construction Engineering and Management, 142(9): 04016038, ISSN 0733-9364
Ebiloma, D O (2024) A digital twin maintenance management model for public hospital buildings in Nigeria. PhD thesis, University of Johannesburg, South Africa.
Economou, G S (1973) Sales forecasting in a sector of the construction industry: A statistical and econometric approach. PhD thesis, University of Manchester, UK.
Edwards, D J and Nicholas, J (2001) Telescopic handler machine park prediction using sales trends. Journal of Financial Management of Property and Construction, 6(2), pp. 109-118. ISSN 1366-4387
Edwards, D J; Nicholas, J and Sharp, R (2001) Forecasting UK construction plant sales. Engineering, Construction and Architectural Management, 8(3), pp. 171-176. ISSN 0969-9988
Egbu, C O (1999) Skills, knowledge and competencies for managing construction refurbishment works. Construction Management and Economics, 17(1), pp. 29-43. ISSN 01446193
Egwim, C N; Alaka, H; Egunjobi, O O; Gomes, A and Mporas, I (2024) Comparison of machine learning algorithms for evaluating building energy efficiency using big data analytics. Journal of Engineering, Design and Technology, 22(4), pp. 1325-1350. ISSN 1726-0531
Egwim, C N; Alaka, H; Pan, Y; Balogun, H; Ajayi, S; Hye, A and Egunjobi, O O (2025) Ensemble of ensembles for fine particulate matter pollution prediction using big data analytics and IoT emission sensors. Journal of Engineering, Design and Technology, 23(2), pp. 640-665. ISSN 1726-0531
Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2005) A conceptual demand led model founded on theories of labour market mismatch for the construction and building services industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
El-Abbasy, M S; Senouci, A; Zayed, T; Mirahadi, F and Parvizsedghy, L (2014) Condition prediction models for oil and gas pipelines using regression analysis. Journal of Construction Engineering and Management, 140(6): 4014013, ISSN 0733-9364
El-Adaway, I H; Ali, G G; Abotaleb, I S and Barber, H M (2020) Studying the relationship between stock prices of publicly traded US construction companies and gross domestic product: Preliminary step toward construction-economy nexus. Journal of Construction Engineering and Management, 146(1): 04019087, ISSN 0733-9364
El-Gafy, M; Abdelhamid, T and Abdelrazig, Y (2010) Environmental impact analysis using hybrid decision support framework: A transportation project case study. International Journal of Construction Education and Research, 6(3), pp. 219-237. ISSN 1557-8771
El-Kholy, A M and Akal, A Y (2021) Determining the stationary financial cause of contracting firms failure. International Journal of Construction Management, 21(8), pp. 818-833. ISSN 1562-3599
El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175
ElAlem, M A; Mahdi, I M; Mohamadien, H A and Hosny, S (2025) Forecasting scope creep in Egyptian construction projects: An evaluation using artificial neural network (ANN) and random forest models. International Journal of Construction Management, 25(16), pp. 2082-2101. ISSN 1562-3599
Elkholosy, H; Ead, R; Hammad, A and AbouRizk, S (2024) Data mining for forecasting labor resource requirements: A case study of project management staffing requirements. International Journal of Construction Management, 24(5), pp. 561-572. ISSN 1562-3599
Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.
Elsayegh, A (2021) Collaborative planning in the construction industry: A holistic framework for assessing collaborative planning practices and predicting project performance. PhD thesis, Missouri University of Science and Technology, USA.
Elshaboury, N; Mohammed Abdelkader, E and Al-Sakkaf, A (2025) Convolutional neural network-based deep learning model for air quality prediction in october city of Egypt. Construction Innovation, 25(2), pp. 620-640. ISSN 1471-4175
Elshaboury, N; Zayed, T and Mohammed Abdelkader, E (2025) A hybrid spherical fuzzy AHP-marcos model for evaluating the condition of saltwater pipes in Hong Kong. Engineering, Construction and Architectural Management, 32(5), pp. 3285-3325. ISSN 0969-9988
Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects. PhD thesis, Heriot-Watt University, UK.
Erişen, S (2021) Incremental transformation of spatial intelligence from smart systems to sensorial infrastructures. Building Research & Information, 49(1), pp. 113-126. ISSN 0961-3218
Esmaeili, B (2012) Identifying and quantifying construction safety risks at the attribute level. PhD thesis, University of Colorado at Boulder, USA.
Essa, R and Fortune, C (2006) Project price forecasting processes and pre-construction evaluation of sustainable housing association projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Essa, R and Fortune, C (2008) Pre-construction evaluation practices of sustainable housing projects in the UK. Engineering, Construction and Architectural Management, 15(6), pp. 514-526. ISSN 0969-9988
Essa, R A (2008) A framework for the pre-construction evaluation of sustainable housing projects in the UK. PhD thesis, Heriot-Watt University, UK.
Evans, R C (2002) Dynamic cash flow forecasting model for construction contractors. PhD thesis, University of Liverpool, UK.
Everett, J G and Farghal, S H (1997) Data representation for predicting performance with learning curves. Journal of Construction Engineering and Management, 123(1), pp. 46-52. ISSN 0733-9364
Ezzeddine, A; Shehab, L; Lucko, G and Hamzeh, F (2022) Forecasting construction project performance with momentum using singularity functions in LPS. Journal of Construction Engineering and Management, 148(8): 04022063, ISSN 0733-9364
Faghih, S A M and Kashani, H (2018) Forecasting construction material prices using vector error correction model. Journal of Construction Engineering and Management, 144(8): 04018075, ISSN 0733-9364
Fan, R Y C; Ng, S T and Wong, J M W (2010) Reliability of the Box-Jenkins model for forecasting construction demand covering times of economic austerity. Construction Management and Economics, 28(3), pp. 241-254. ISSN 1466433X
Faraji, A (2021) Neuro-fuzzy system based model for prediction of project performance in downstream sector of petroleum industry in Iran. Journal of Engineering, Design and Technology, 19(6), pp. 1268-1290. ISSN 1726-0531
Farghal, S H and Everett, J G (1997) Learning curves: Accuracy in predicting future performance. Journal of Construction Engineering and Management, 123(1), pp. 41-45. ISSN 0733-9364
Farooq, M. and Paracha, A. T. (2026) Cost prediction of road construction projects in Pakistan using machine learning. International Journal of Construction Management, 26(8), pp. 1442-1470. ISSN 1562-3599
Fathy, A E A E R; Abdel-Hamid, M and Abdelhaleem, H M (2025) Developing a predictive maintenance model for the rehabilitation of roads' assets. International Journal of Construction Management, 25(4), pp. 398-408. ISSN 1562-3599
Faubel, C.; Mowen, D.; Miri, M.; Demarquet Alban, U.; Martinez-Molina, A. and Alamaniotis, M. (2026) Multimodal transformer models for real-time estimation of indoor environmental quality in educational settings. Smart and Sustainable Built Environment, pp. 1-37. ISSN 2046-6099
Felllows, R F (1988) Escalation management. PhD thesis, University of Reading, UK.
Fellows, R F (1991) Escalation management: Forecasting the effects of inflation on building projects. Construction Management and Economics, 9(2), pp. 187-204. ISSN 01446193
Feng, K (2022) Infrastructure resilience and management under changing tropical cyclone risk. PhD thesis, Princeton University, USA.
Fernandez-Solis, J L (2013) Building construction: A deterministic non-periodic flow-a case study of chaos theories in tracking production flow. Architectural Engineering and Design Management, 9(1), pp. 21-48. ISSN 1745-2007
Fetterhoff III, O G (2004) Comparative evaluation of strategic construction-market forecasting methodologies. PhD thesis, University of Florida, USA.
Fieldson, R (2017) The afterlife clause; towards a strategy for improved adaptation in retail property. International Journal of Building Pathology and Adaptation, 35(4), pp. 364-379.
Finch, E F (1989) A requisite decision model for the selection of mechanical and electrical services in buildings. PhD thesis, University of Reading, UK.
Fitzgerald, E and Akintoye, A (1995) The accuracy and optimal linear correction of UK construction tender price index forecasts. Construction Management and Economics, 13(6), pp. 493-500. ISSN 01446193
Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.
Flanagan, R and Norman, G (1983) The accuracy and monitoring of quantity surveyors' price forecasting for building work. Construction Management and Economics, 1(2), pp. 157-180. ISSN 01446193
Forbes, D; El-Haram, M; Horner, M and Lilley, S (2012) Forecasting the number of jobs created through construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Forcada, N; Gangolells, M; Casals, M and Macarulla, M (2017) Factors affecting rework costs in construction. Journal of Construction Engineering and Management, 143(8): 04017032, ISSN 0733-9364
Fortune, C (2001) Exploring the model selection process in the formulation of building project advice. Journal of Financial Management of Property and Construction, 6(3), pp. 167-177. ISSN 1366-4387
Fortune, C and Cox, O (2005) Current practices in building project contract price forecasting in the UK. Engineering, Construction and Architectural Management, 12(5), pp. 446-457. ISSN 0969-9988
Fortune, C and Hinks, J (1999) Quality issues in building project price forecasting: factors affecting model selection. Journal of Construction Procurement, 5(2), pp. 129-140. ISSN 1358-9180
Fortune, C J (1999) Factors affecting the selection of building project price forecasting tools. PhD thesis, Heriot-Watt University, UK.
Fosas, D; Moran, F; Natarajan, S; Orr, J and Coley, D (2020) The importance of thermal modelling and prototyping in shelter design. Building Research & Information, 48(4), pp. 379-400. ISSN 0961-3218
Francis, A and Thomas, A (2022) A machine learning-based life cycle assessment prediction model for the environmental impacts of buildings. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Fu, J; Tian, H; Song, L; Li, M; Bai, S and Ren, Q (2021) Productivity estimation of cutter suction dredger operation through data mining and learning from real-time big data. Engineering, Construction and Architectural Management, 28(7), pp. 2023-2041. ISSN 0969-9988
Ganesan, S; Lau, S S Y; Wong, K C and Chau, K W (2004) Growth of finance, insurance and real estate (FIRE) and office space absorption in Hong Kong. Journal of Financial Management of Property and Construction, 9(2), pp. 103-117. ISSN 1366-4387
Gannon, M J and Smith, N J (2011) An effective outline business case to facilitate successful decision-making. Construction Management and Economics, 29(2), pp. 185-197. ISSN 1466433X
Gao, X and Pishdad-Bozorgi, P (2020) A framework of developing machine learning models for facility life-cycle cost analysis. Building Research & Information, 48(5), pp. 501-525. ISSN 0961-3218
Gautam, K P (2009) Life-cycle cost analysis of home-ownership. PhD thesis, University of Hawai'i at Manoa, USA.
Ge, X J and Lam, K-C (2002) Building a house prices forecasting model in Hong Kong. Construction Economics and Building, 2(2), pp. 57-70. ISSN 2204-9029
Geekiyanage, D; Ramachandra, T and Rotimi, J O B (2017) A morphology-based model for forecasting cooling energy demand of condominium buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Gerstenberger, A J (2021) Modeling the likelihood of construction incidents using public data. EdD thesis, Teachers College, Columbia University, USA.
Ghanbari, M; Rusch, R and Skitmore, M (2024) BIM-based environmental assessment of residential renovation projects during the operational phase. Architectural Engineering and Design Management, 20(3), pp. 624-635. ISSN 1745-2007
Ghosh, S; Krishna, S R; Billton, J V; Srikanth, S A; Mohandas, S; Ashwin Ganesh, M and Shiv Kulin, C (2021) Countering tropical cyclonic storm impacts on low-rise houses. Smart and Sustainable Built Environment, 10(4), pp. 631-652. ISSN 2046-6099
Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Thomson, R (2023) Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(10), pp. 820-839. ISSN 01446193
Ginigaddara, Buddhini (2022) Developing a skill profile prediction model for typologies of offsite construction. PhD thesis, Western Sydney University, Australia.
Glavan, J R (1988) Analysis of design-related problems from an industrial project. PhD thesis, University of Texas at Austin, USA.
Glavan, J R and Tucker, R L (1991) Forecasting design-related problems-case study. Journal of Construction Engineering and Management, 117(1), pp. 47-65. ISSN 0733-9364
Goh, B H (1997) Construction demand modelling: a systematic approach to using economic indicators and a comparative study of alternative forecasting approaches. PhD thesis, University College London, UK.
Goh, B H (1998) Forecasting residential construction demand in Singapore: A comparative study of the accuracy of time series, regression and artificial neural network techniques. Engineering, Construction and Architectural Management, 5(3), pp. 261-275. ISSN 0969-9988
Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175
González, V; Alarcón, L F; Maturana, S; Mundaca, F and Bustamante, J (2010) Improving planning reliability and project performance using the reliable commitment model. Journal of Construction Engineering and Management, 136(10), pp. 1129-1139. ISSN 0733-9364
González-Cruz, M C; Ballesteros-Pérez, P; Lucko, G and Zhang, J X (2022) Critical duration index: Anticipating project delays from deterministic schedule information. Journal of Construction Engineering and Management, 148(11): 04022121, ISSN 0733-9364
Goto, Y (2012) Sustainable wooden building concept for central Japan. DSc thesis, ETH Zürich, Switzerland.
Grau, D and Back, W E (2015) Predictability index: Novel metric to assess cost and schedule performance. Journal of Construction Engineering and Management, 141(12): 04015043, ISSN 0733-9364
Greenwood, D J and Shaglouf, A A (1997) Comparison between planned and actual durations in medium sized building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.
Gunaydin, H M (1999) Impact of information technologies on project management functions. PhD thesis, Illinois Institute of Technology, USA.
Gunner, J and Skitmore, M (1999) Comparative analysis of pre-bid forecasting of building prices based on Singapore data. Construction Management and Economics, 17(5), pp. 635-646. ISSN 01446193
Gunner, J and Skitmore, M (1999) Pre-bid building price forecasting accuracy: Price intensity theory. Engineering, Construction and Architectural Management, 6(3), pp. 267-275. ISSN 0969-9988
Gunner, J C (1997) A model of building price forecasting accuracy. PhD thesis, University of Salford, UK.
Guo, K (2006) Risk of pavement warranties to contractors. PhD thesis, University of Florida, USA.
Guo, Q L (2001) Development of risk analysis models for decision-making in project management. PhD thesis, Edinburgh Napier University, UK.
Gurmu, A. (2026) Forecasting building cost index with vecm: Integrating output-based indexes and macroeconomic indicators. Journal of Engineering, Design and Technology, 24(4), pp. 1012-1036. ISSN 1726-0531
Gurmu, A T (2026) Econometric analysis of macroeconomic factors influencing construction labour productivity at industry level: Evidence from Australia. Construction Management and Economics, 44(1), pp. 23-40. ISSN 0144-6193
Gurmu, A T and Ongkowijoyo, C S (2020) Predicting construction labor productivity based on implementation levels of human resource management practices. Journal of Construction Engineering and Management, 146(3): 04019115, ISSN 0733-9364
Guszcza, George K (2023) Bayesian cost-to-complete forecasting for architecture and engineering design. DEngr thesis, George Washington University, USA.
Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.
Hamayat, F.; Ahmad, R. F.; Ghaban, W.; Saeed, F.; Ahmad, J.; Anwar, S. M. and Zubair, S. (2026) Data-driven stnet and stprophet models for secure edge-based indoor air temperature prediction in smart buildings. Building Research & Information, 54(4), pp. 492-509. ISSN 0961-3218
Hamida, A; Alsudairi, A; Alshaibani, K and Alshamrani, O (2021) Environmental impacts cost assessment model of residential building using an artificial neural network. Engineering, Construction and Architectural Management, 28(10), pp. 3190-3215. ISSN 0969-9988
Hamide, M (2017) Schedule and cost performance analysis and prediction in Louisiana DOTD. PhD thesis, University of New Orleans, USA.
Hamoda, M F (2008) Modeling of construction noise for environmental impact assessment. Journal of Construction in Developing Countries, 13(1), pp. 79-89. ISSN 1823-6499
Hamour, O A A R (1978) Project selection and planning in developing countries. PhD thesis, Swansea University, UK.
Han, S H; Kim, D Y and Kim, H (2007) Predicting profit performance for selecting candidate international construction projects. Journal of Construction Engineering and Management, 133(6), pp. 425-436. ISSN 0733-9364
Handa, V K and Abdalla, O (1989) Forecasting productivity by work sampling. Construction Management and Economics, 7(1), pp. 19-28. ISSN 01446193
Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364
Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.
Harun, Z B (1993) Computer simulation in decision support systems for management of construction projects. PhD thesis, University of Leeds, UK.
Hassim, S; Kadir, M R A; Lew, Y L and Sim, Y C (2003) Estimation of minimum working capital for construction projects in Malaysia. Journal of Construction Engineering and Management, 129(4), pp. 369-374. ISSN 0733-9364
Hatayama, H and Tahara, K (2016) Using decomposition analysis to forecast metal usage in the building stock. Building Research & Information, 44(1), pp. 63-72. ISSN 0961-3218
He, R (2023) Modeling of sustainable materials management systems: Hybrid science-based, data-driven approaches. PhD thesis, Carnegie Mellon University, USA.
Herbsman, Z (1983) Long-range forecasting highway construction costs. Journal of Construction Engineering and Management, 109(4), pp. 423-434. ISSN 0733-9364
Higgins, D M (2013) The black swan effect and the impact on Australian property forecasting. Journal of Financial Management of Property and Construction, 18(1), pp. 76-89. ISSN 1366-4387
Higham, A and Fortune, C (2010) The early stage benefit planning of housing rengeneration projects: The gap between theory and practice. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Hildreth, J C (2020) Effect of period length on forecasting maintenance and repair costs for heavy equipment by the period cost based methodology. International Journal of Construction Education and Research, 16(3), pp. 167-179. ISSN 1557-8771
Ho, P (2012) Comparison of the grey model and the box jenkins model in forecasting manpower in the UK construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ho, P H K (2010) Forecasting construction manpower demand by gray model. Journal of Construction Engineering and Management, 136(12), pp. 1299-1305. ISSN 0733-9364
Ho, P H K (2013) Forecasting the manpower demand for quantity surveyors in Hong Kong. Construction Economics and Building, 13(3), pp. 1-12. ISSN 2204-9029
Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.
Hollar, D A; Rasdorf, W; Liu, M; Hummer, J E; Arocho, I and Hsiang, S M (2013) Preliminary engineering cost estimation model for bridge projects. Journal of Construction Engineering and Management, 139(9), pp. 1259-1267. ISSN 0733-9364
Holumyong, C (2007) The differential impact of unemployment and the receipt of unemployment benefits between native and foreign born workers in the United States construction industry. PhD thesis, University of Utah, USA.
Hong, Y; Tian, Z and Sun, X (2020) Dynamic evaluation for compaction quality of roller compacted concrete based on reliability metrics. Journal of Construction Engineering and Management, 146(10): 04020123, ISSN 0733-9364
Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction. PhD thesis, University of Calgary, Canada.
Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.
Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases. PhD thesis, Brunel University, UK.
Hsiao, W T; Yu, W D and Shih, C C (2026) Proactive construction hazard prevention model using machine learning. Journal of Construction Engineering and Management, 152(2): 04025261, ISSN 0733-9364
Hua, G B (1996) Residential construction demand forecasting using economic indicators: A comparative study of artificial neural networks and multiple regression. Construction Management and Economics, 14(1), pp. 25-34. ISSN 01446193
Hua, G B and Pin, T H O (2000) Forecasting construction industry demand, price and productivity in Singapore: The Box-Jenkins approach. Construction Management and Economics, 18(5), pp. 607-618. ISSN 01446193
Hwang, B G; Shan, M; Zhu, L and Lim, W C (2020) Cost control in megaprojects: Efficacy, tools and techniques, key knowledge areas and project comparisons. International Journal of Construction Management, 20(5), pp. 437-449. ISSN 1562-3599
Hwang, S (2009) Dynamic regression models for prediction of construction costs. Journal of Construction Engineering and Management, 135(5), pp. 360-367. ISSN 0733-9364
Hwang, S (2010) Cross-validation of short-term productivity forecasting methodologies. Journal of Construction Engineering and Management, 136(9), pp. 1037-1046. ISSN 0733-9364
Hwang, S (2011) Time series models for forecasting construction costs using time series indexes. Journal of Construction Engineering and Management, 137(9), pp. 656-662. ISSN 0733-9364
Hwang, S and Liu, L Y (2010) Contemporaneous time series and forecasting methodologies for predicting short-term productivity. Journal of Construction Engineering and Management, 136(9), pp. 1047-1055. ISSN 0733-9364
Hwang, S; Park, M; Lee, H S and Kim, H (2012) Automated time-series cost forecasting system for construction materials. Journal of Construction Engineering and Management, 138(11), pp. 1259-1269. ISSN 0733-9364
Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Innocent Jr., M J F (2018) Predicting military construction project time outcomes using data analytics. PhD thesis, George Washington University, USA.
Ioannou, P G (1987) Geologic prediction model for tunneling. Journal of Construction Engineering and Management, 113(4), pp. 569-590. ISSN 0733-9364
Ioannou, P G (1989) Evaluation of subsurface exploration programs. Journal of Construction Engineering and Management, 115(3), pp. 339-356. ISSN 0733-9364
Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD thesis, University of Lagos, Nigeria.
Isied, M M (2023) Critical assessment of asphalt mixture design procedures and asphalt mixture classification systems. PhD thesis, North Carolina State University, USA.
Jacques de Sousa, L; Poças Martins, J and Sanhudo, L (2024) Predicting construction project compliance with machine learning model: case study using Portuguese procurement data. Engineering, Construction and Architectural Management, 31(13), pp. 285-302. ISSN 0969-9988
Jafari, A and Akhavian, R (2019) Driving forces for the US residential housing price: A predictive analysis. Built Environment Project and Asset Management, 9(4), pp. 515-529. ISSN 2044-124X
Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.
Jagafa, K (2016) A framework for construction business recovery in small and medium sized privately owned companies. PhD thesis, University of Salford, UK.
Jagger, N S B (2017) Skill requirements of the low carbon transition. PhD thesis, University of Sussex, UK.
Jang, J (2008) Improving the make-ready process and forecasting project performance using performance of the make-ready process. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Jang, Y; Jeong, I and Cho, Y K (2021) Identifying impact of variables in deep learning models on bankruptcy prediction of construction contractors. Engineering, Construction and Architectural Management, 28(10), pp. 3282-3298. ISSN 0969-9988
Jang, Y; Jeong, I B; Cho, Y K and Ahn, Y (2019) Predicting business failure of construction contractors using long short-term memory recurrent neural network. Journal of Construction Engineering and Management, 145(11): 04019067, ISSN 0733-9364
Jawad, S and Ledwith, A (2022) A measurement model of project control systems success for engineering and construction projects case study: Contractor companies in saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 29(3), pp. 1218-1240. ISSN 0969-9988
Jeong, E; Jang, J; Kim, T W and Lee, S (2025) Divide-and-conquer-based stratified models for predicting precast concrete installation times. Journal of Construction Engineering and Management, 151(9): 05025011, ISSN 0733-9364
Jeong, J and Jeong, J (2024) Sustainability in prefabricated construction: Enhancing multicriteria analysis and prediction using machine learning. Journal of Construction Engineering and Management, 150(8): 04024081, ISSN 0733-9364
Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Modeling framework to quantify and gauge project cost risks due to construction material price volatilities using predictive probabilistic deep-learning algorithms and stochastic risk modeling. Journal of Construction Engineering and Management, 151(7): 04025071, ISSN 0733-9364
Jha, K N and Chockalingam, C T (2011) Prediction of schedule performance of Indian construction projects using an artificial neural network. Construction Management and Economics, 29(9), pp. 901-911. ISSN 1466433X
Jiang, H and Liu, C (2011) Forecasting construction demand: A vector error correction model with dummy variables. Construction Management and Economics, 29(9), pp. 969-979. ISSN 1466433X
Jiang, H and Liu, C (2014) A panel vector error correction approach to forecasting demand in regional construction markets. Construction Management and Economics, 32(12), pp. 1205-1221. ISSN 01446193
Jiang, H; Xu, Y and Liu, C (2013) Construction price prediction using vector error correction models. Journal of Construction Engineering and Management, 139(11): 4013022, ISSN 0733-9364
Jiang, H; Xu, Y and Liu, C (2014) Market effects on forecasting construction prices using vector error correction models. International Journal of Construction Management, 14(2), pp. 101-112. ISSN 1562-3599
Jiang, Heng (2013) Econometric techniques for estimating construction demand in Australia. PhD thesis, Deakin University, Australia.
Jiang, L; Zhao, T; Feng, C and Zhang, W (2023) Improvement of random forest by multiple imputation applied to tower crane accident prediction with missing data. Engineering, Construction and Architectural Management, 30(3), pp. 1222-1242. ISSN 0969-9988
Jin, X H (2011) Model for efficient risk allocation in privately financed public infrastructure projects using neuro-fuzzy techniques. Journal of Construction Engineering and Management, 137(11), pp. 1003-1014. ISSN 0733-9364
Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531
Jolly Cyril, E (2026) Mediating effect of innovation on the relationship between project financing and construction cost efficiency: Innovation integrated cost efficiency perspective. Journal of Construction Engineering and Management, 152(1): 04025226, ISSN 0733-9364
Jones, P; Lannon, S and Patterson, J (2013) Retrofitting existing housing: How far, how much? Building Research & Information, 41(5), pp. 532-550. ISSN 0961-3218
Jonnalagadda, S (2016) Artificial neural networks, non linear auto regression networks (NARX) and causal loop diagram approaches for modelling bridge infrastructure conditions. PhD thesis, Clemson University, USA.
Joukar, A (2016) Analysis and management of the price volatility in the construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects. PhD thesis, Concordia University, Canada.
Jupp, B C (2003) Forecasting value in building projects. PhD thesis, Loughborough University, UK.
Kaiser, M J and Lledare, W O (2006) The gulf of Mexico decommissioning market. Journal of Construction Engineering and Management, 132(8), pp. 815-826. ISSN 0733-9364
Kaka, A P (2001) Turnover forecasting for contracting companies based on published information. Journal of Financial Management of Property and Construction, 6(3), pp. 217-229. ISSN 1366-4387
Kaka, A P and Boussabaine, A H (1999) Updating techniques for cumulative cost forecasting on construction projects. Journal of Construction Procurement, 5(2), pp. 141-158. ISSN 1358-9180
Kaka, A P and Fortune, C (2002) Net cash flow models: Towards the black box approach. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kaka, A P and Price, A D (1994) A survey of contractors' corporate planning and financial budgeting: Contractors lack effective and accurate methods of corporate planning, financial budgeting and cashflow forecasting identified in survey of 15 british construction companies. Building Research & Information, 22(3), pp. 174-182. ISSN 0961-3218
Kaka, A P and Price, A D F (1991) Net cashflow models: Are they reliable? Construction Management and Economics, 9(3), pp. 291-308. ISSN 01446193
Kamal, P and Ahuja, S (2019) An ensemble-based model for prediction of academic performance of students in undergrad professional course. Journal of Engineering, Design and Technology, 17(4), pp. 769-781. ISSN 1726-0531
Kangari, R (1988) Business failure in construction industry. Journal of Construction Engineering and Management, 114(2), pp. 172-190. ISSN 0733-9364
Kangari, R; Farid, F and Elgharib, H M (1992) Financial performance analysis for construction industry. Journal of Construction Engineering and Management, 118(2), pp. 349-361. ISSN 0733-9364
Kangari, R and Miyatake, Y (1997) Developing and managing innovative construction technologies in Japan. Journal of Construction Engineering and Management, 123(1), pp. 72-84. ISSN 0733-9364
Kantianis, D D (2022) Design morphology complexity and conceptual building project cost forecasting. Journal of Financial Management of Property and Construction, 27(3), pp. 387-414. ISSN 1366-4387
Karaiskos, P; Munian, Y; Martinez-Molina, A and Alamaniotis, M (2026) Indoor air quality prediction modeling for a naturally ventilated fitness building using rnn-LSTM artificial neural networks. Smart and Sustainable Built Environment, 15(1), pp. 384-406. ISSN 2046-6099
Karami, S (2008) Using by-product industrial materials to replace all cement in construction products. PhD thesis, Coventry University, UK.
Karamujic, H (2012) Modelling seasonality in Australian building approvals. Construction Economics and Building, 12(1), pp. 26-36. ISSN 2204-9029
Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988
Karki, S and Hadikusumo, B (2023) Machine learning for the identification of competent project managers for construction projects in Nepal. Construction Innovation, 23(1), pp. 1-18. ISSN 1471-4175
Kenley, R (2001) In-project end-date forecasting: An idiographic, deterministic approach, using cash-flow modelling. Journal of Financial Management of Property and Construction, 6(3), pp. 209-216. ISSN 1366-4387
Kenley, R (2001) The predictive ability of bromilow's time-cost model: A comment. Construction Management and Economics, 19(8), pp. 759-764. ISSN 01446193
Kere, K J (2023) Probabilistic model development and risk management strategies for pipelines with anomalies. PhD thesis, Marquette University, USA.
Kereri, J O (2020) The effects of relational and social behaviors exhibited by construction project team members on relationship quality and project outcomes. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Khalid, A G (1992) Hedonic price estimation of the financial impact of obsolescence on commercial property buildings. PhD thesis, University of Reading, UK.
Khoshbakht Iradmoosa, Maryam (2019) Building performance studies for higher education campus buildings: Energy use, occupant satisfaction and thermal comfort. PhD thesis, Griffith University, Australia.
Khosrowshahi, F (1989) A new mathematically based model for forecasting construction project expenditure pattern. PhD thesis, South Bank Polytechnic, UK.
Khosrowshahi, F (1991) Simulation of expenditure patterns of construction projects. Construction Management and Economics, 9(2), pp. 113-132. ISSN 01446193
Khosrowshahi, F (1996) Value profile analysis of contruction projects. Journal of Financial Management of Property and Construction, 1(1), pp. 55-76. ISSN 1366-4387
Khosrowshahi, F (2000) A radical approach to risk in project financial management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Khosrowshahi, F (2001) Project cash flow forecasting: A mathematical approach. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Khosrowshahi, F and Alani, A M (2003) A model for smoothing time-series data in construction. Construction Management and Economics, 21(5), pp. 483-494. ISSN 01446193
Kiani Mavi, N; Brown, K; Fulford, R and Goh, M (2024) Forecasting project success in the construction industry using adaptive neuro-fuzzy inference system. International Journal of Construction Management, 24(14), pp. 1550-1568. ISSN 1562-3599
Kim, D. H. and Jeong, J. H. (2026) Development of a decision-making framework to prioritize expressway pavement sections for large-scale repairs. Journal of Construction Engineering and Management, 152(8): 04026106, ISSN 0733-9364
Kim, S. and Liang, Y. (2026) Dissecting highway construction cost inflation: A two-decade analysis of inflation types using the national highway construction cost index. Journal of Construction Engineering and Management, 152(7): 04026087, ISSN 0733-9364
Kim, S; Makhmalbaf, A and Shahandashti, M (2025) Forecasting the architecture billings index (abi) using machine learning predictive models. Engineering, Construction and Architectural Management, 32(8), pp. 5371-5393. ISSN 0969-9988
Kim, B C (2007) Forecasting project progress and early warning of project overruns with probabilistic methods. PhD thesis, Texas A&M University, USA.
Kim, B C and Kim, H J (2014) Sensitivity of earned value schedule forecasting to S-curve patterns. Journal of Construction Engineering and Management, 140(7): 04014023, ISSN 0733-9364
Kim, B C and Kim, S J (2015) Credibility evaluation of project duration forecast using forecast sensitivity and forecast-risk compatibility. Journal of Construction Engineering and Management, 141(8): 04015023, ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2009) Probabilistic forecasting of project duration using bayesian inference and the beta distribution. Journal of Construction Engineering and Management, 135(3), pp. 178-186. ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2010) Probabilistic forecasting of project duration using Kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), pp. 834-843. ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2011) Combination of project cost forecasts in earned value management. Journal of Construction Engineering and Management, 137(11), pp. 958-966. ISSN 0733-9364
Kim, B S and Hong, T (2012) Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction. Journal of Construction Engineering and Management, 138(1), pp. 154-162. ISSN 0733-9364
Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364
Kim, H; Lee, H S; Park, M; Ahn, C R and Hwang, S (2015) Productivity forecasting of newly added workers based on time-series analysis and site learning. Journal of Construction Engineering and Management, 141(9): 5015008, ISSN 0733-9364
Kim, J (2004) Delay forecasting using a vulnerability index. PhD thesis, Purdue University, USA.
Kim, J C; Kim, D H; Kim, J J; Ye, J S and Lee, H S (2000) Segmenting the Korean housing market using multiple discriminant analysis. Construction Management and Economics, 18(1), pp. 45-54. ISSN 01446193
Kim, J M; Yum, S G; Adhikari, M D and Bae, J (2024) A LSTM algorithm-driven deep learning approach to estimating repair and maintenance costs of apartment buildings. Engineering, Construction and Architectural Management, 31(13), pp. 369-389. ISSN 0969-9988
Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building. PhD thesis, University of Liverpool, UK.
Kirkham, R J and Boussabaine, A H (2005) Forecasting the residual service life of nhs hospital buildings: A stochastic approach. Construction Management and Economics, 23(5), pp. 521-529. ISSN 01446193
Kirkham, R J; Halim Boussabaine, A and Kirkham, M P (2002) Stochastic time series forecasting of electricity costs in an nhs acute care hospital building, for use in whole life cycle costing. Engineering, Construction and Architectural Management, 9(1), pp. 38-52. ISSN 0969-9988
Kissi, E; Adjei-Kumi, T; Amoah, P and Gyimah, J (2018) Forecasting construction tender price index in Ghana using autoregressive integrated moving average with exogenous variables model. Construction Economics and Building, 18(1), pp. 70-82. ISSN 2204-9029
Ko, C H and Cheng, M Y (2007) Dynamic prediction of project success using artificial intelligence. Journal of Construction Engineering and Management, 133(4), pp. 316-324. ISSN 0733-9364
Koch, C (2012) Contested overruns and performance of offshore wind power plants. Construction Management and Economics, 30(8), pp. 609-622. ISSN 1466433X
Koksal, A (2002) Predicting the development of decline in construction companies. PhD thesis, Illinois Institute of Technology, USA.
Kostourou, F (2021) Housing growth: Impacts on density, space consumption and urban morphology. Buildings & Cities, 2(1), pp. 55-78. ISSN 2632-6655
Kuipers, E J (1976) A method of forecasting the efficiency of construction labor in any climatological conditions. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kulevich, A E (2025) Effective strategies for mitigating bidding corruption for U.S. Infrastructure contracts. DBA thesis, Walden University, USA.
Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(1), pp. 17-29. ISSN 01446193
Kwon, N; Park, M; Lee, H S; Ahn, J and Kim, S (2017) Construction noise prediction model based on case-based reasoning in the preconstruction phase. Journal of Construction Engineering and Management, 143(6): 04017008, ISSN 0733-9364
Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.
Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193
Lam, K C; Hu, T; Cheung, S O; Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(2), pp. 130-144. ISSN 0969-9988
Lam, K C and Oshodi, O S (2016) Forecasting construction output: A comparison of artificial neural network and Box-Jenkins model. Engineering, Construction and Architectural Management, 23(3), pp. 302-322. ISSN 0969-9988
Lam, Ka-Chi (1997) The optimisation of financial decisions in a contracting firm. PhD thesis, University of New South Wales, Australia.
Lataniotis, C (2019) Data-driven uncertainty quantification for high-dimensional engineering problems. DSc thesis, ETH Zürich, Switzerland.
Laufer, A and Tucker, R L (1988) Competence and timing dilemma in construction planning. Construction Management and Economics, 6(4), pp. 339-355. ISSN 01446193
Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599
Lawal, H S; Ahmadu, H A; Abdullahi, M; Yamusa, M A and Abdulrazaq, M (2023) Modeling duration of building renovation projects. Journal of Financial Management of Property and Construction, 28(3), pp. 423-438. ISSN 1366-4387
Lazo, A G; Çidik, M S; Addyman, S and Rillie, I (2024) Perspectives on project management and asset management integration: A systematic review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Le, A T H; Domingo, N; Rasheed, E and Park, K S (2018) Building maintenance cost planning and estimating: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.
Lee, C and Park, K K H (2022) Forecasting trading volume in local housing markets through a time-series model and a deep learning algorithm. Engineering, Construction and Architectural Management, 29(1), pp. 165-178. ISSN 0969-9988
Lee, C Y-H (2010) A probabilistic approach to the life-cycle cost assessment of preventive maintenance strategies on flexible pavements. PhD thesis, University of California, Davis, USA.
Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364
Lee, J; Blumenstein, M; Guan, H and Loo, Y C (2013) Minimising uncertainty in long-term prediction of bridge element. Engineering, Construction and Architectural Management, 20(2), pp. 127-142. ISSN 0969-9988
Lee, Jaeho (2007) A methodology for developing bridge condition rating models based on limited inspection records. PhD thesis, Griffith University, Australia.
Lee, W; Lin, K Y; Johnson, P W and Seto, E Y W (2022) Selection of wearable sensor measurements for monitoring and managing entry-level construction worker fatigue: A logistic regression approach. Engineering, Construction and Architectural Management, 29(8), pp. 2905-2923. ISSN 0969-9988
Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.
Leung, A W T and Tam, C M (1999) Models for assessing hoisting times of tower cranes. Journal of Construction Engineering and Management, 125(6), pp. 385-391. ISSN 0733-9364
Leung, M Y; Chan, Y S and Yu, J (2009) Integrated model for the stressors and stresses of construction project managers in Hong Kong. Journal of Construction Engineering and Management, 135(2), pp. 126-134. ISSN 0733-9364
Leung, M Y; Zhang, H and Skitmore, M (2008) Effects of organizational supports on the stress of construction estimation participants. Journal of Construction Engineering and Management, 134(2), pp. 84-93. ISSN 0733-9364
Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.
Li, J; Moselhi, O and Alkass, S (2006) Forecasting project status by using fuzzy logic. Journal of Construction Engineering and Management, 132(11), pp. 1193-1202. ISSN 0733-9364
Li, M; Baek, M and Ashuri, B (2021) Forecasting ratio of low bid to owner's estimate for highway construction. Journal of Construction Engineering and Management, 147(1): 04020157, ISSN 0733-9364
Li, Y (2023) Integrated multi-stage decision-support for enhanced infrastructure restoration under uncertainty. PhD thesis, George Mason University, USA.
Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364
Liu, D; Sun, J; Zhong, D and Song, L (2012) Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9), pp. 1085-1094. ISSN 0733-9364
Liu, L and Napier, Z (2010) The accuracy of risk-based cost estimation for water infrastructure projects: Preliminary evidence from Australian projects. Construction Management and Economics, 28(1), pp. 89-100. ISSN 1466433X
Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.
Loganathan, M K and Gandhi, O P (2015) Reliability evaluation and analysis of CNC cam shaft grinding machine. Journal of Engineering, Design and Technology, 13(1), pp. 37-73.
Lombard, P C (1991) The relationship between highway infrastructure and regional economic development. PhD thesis, Purdue University, USA.
Loo, S C; Wang, C; Yap, J B H; Abdul-Rahman, H and Wood, L C (2020) Globalisation entry decision-supporting tool for international construction risks. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 151-166. ISSN 17514304
Lopez de Ortigosa, D A (1993) Forecasting construction costs in hyper-inflated economies. PhD thesis, University of Texas at Austin, USA.
Love, N E (2009) Leading indicators of failure: a study of SMEs in the construction sector in Wales and Scotland. PhD thesis, University of the West of England, Bristol, UK.
Love, P E D; Tse, R Y C and Edwards, D J (2005) Time-cost relationships in Australian building construction projects. Journal of Construction Engineering and Management, 131(2), pp. 187-194. ISSN 0733-9364
Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida. PhD thesis, University of Florida, USA.
Lowe, D (2003) The development of early stage design cost estimating expertise: Effective feedback and systematic reflection for quantity surveyors. Journal of Financial Management of Property and Construction, 8(2), pp. 79-88. ISSN 1366-4387
Lowe, D J (1998) Effective feedback and systematic reflection in design cost estimating. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Lowe, D J and Skitmore, M (2007) The learning climate of an organisation and practitioner competence. Journal of Financial Management of Property and Construction, 12(3), pp. 151-164. ISSN 1366-4387
Lowe, D J and Skitmore, R M (2001) Human effects in construction contract price forecasting: Experience and experiential learning styles. Journal of Construction Engineering and Management, 127(6), pp. 485-493. ISSN 0733-9364
Lu, Y; Girling, C; Martino, N; Kim, J; Kellett, R and Salter, J (2023) Climate action at the neighbourhood scale: Comparing municipal future scenarios. Buildings & Cities, 4(1), pp. 83-102. ISSN 2632-6655
Lu, Y; Pang, D and Li, Y (2016) Evolutionary collaboration network and organizational competitiveness in megaprojects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Lucko, G (2011) Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), pp. 523-535. ISSN 0733-9364
Ma, M; Tam, V W Y; Le, K N and Osei-Kyei, R (2024) A systematic literature review on price forecasting models in construction industry. International Journal of Construction Management, 24(11), pp. 1191-1200. ISSN 1562-3599
Maaz, Z. N.; Jamaludin, A. F.; Mohd Rahim, F. A.; Rashidi, A. and Darmansah, N. F. (2026) Artificial intelligence capabilities in project cost management in the Malaysian construction industry: An exploratory study. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988
Mahdavian, A; Shojaei, A; Salem, M; Yuan, J S and Oloufa, A A (2021) Data-driven predictive modeling of highway construction cost items. Journal of Construction Engineering and Management, 147(3): 04020180, ISSN 0733-9364
Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.
Mahmoudi, E; Stepien, M and König, M (2021) Optimisation of geotechnical surveys using a BIM-based geostatistical analysis. Smart and Sustainable Built Environment, 10(3), pp. 420-437. ISSN 2046-6099
Mak, M Y; Ng, S T; Chen, S E and Varnam, M (2000) The relationship between economic indicators and Bromilow's time-cost model: A pilot study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Mak, S and Raftery, J (1992) Risk attitude and systematic bias in estimating and forecasting. Construction Management and Economics, 10(4), pp. 303-320. ISSN 01446193
Malekaee Ashtiyani, F; Karimi Gavareshki, M H and Gheidar-Kheljani, J (2026) AI-based multi-layer framework for monitoring productivity and coordinating subcontractors in construction projects. International Journal of Construction Management, 26(5), pp. 905-924. ISSN 1562-3599
Malekaee Ashtiyani, F.; Karimi Gavareshki, M. h and Gheidar-Kheljani, J. (2026) Real-time prediction of project duration deviation using CNN-LSTM-FIS. Built Environment Project and Asset Management, 16(2), pp. 304-320. ISSN 2044-124X
Manavazhi, M R and Xunshi, Z (2001) Productivity oriented analysis of design revisions. Construction Management and Economics, 19(4), pp. 379-391. ISSN 01446193
Maniar, H (2020) Contingency management in Indian construction projects. Journal of Construction Business and Management, 4(2), pp. 11-24. ISSN 2521-0165
Manjia, M; Pettang, C and Abanda, F H (2011) Urban self-building labour cost modelling in Cameroon. Journal of Construction in Developing Countries, 16(2), pp. 69-90. ISSN 1823-6499
Mao, Z (2003) Forecasting total factor productivity growth in the construction industry using neural network modelling. PhD thesis, National University of Singapore, Singapore.
Mater, Y; Kamel, M; Karam, A and Bakhoum, E (2023) Ann-python prediction model for the compressive strength of green concrete. Construction Innovation, 23(2), pp. 340-359. ISSN 1471-4175
Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.
Mbae, A M and Nwulu, N I (2020) Day-ahead load forecasting using improved grey Verhulst model. Journal of Engineering, Design and Technology, 18(5), pp. 1335-1348. ISSN 1726-0531
Mdibi, L; Van Zyl, R; Kosch, M and Ward, J (2021) A land-based hf transmitter for ionospheric propagation studies using superdarn radars. Journal of Engineering, Design and Technology, 19(6), pp. 1648-1659. ISSN 1726-0531
Meharie, M G; Mengesha, W J; Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(7), pp. 2836-2853. ISSN 0969-9988
Mejia Aguilar, G (2013) Improving accuracy of project outcome predictions. PhD thesis, University of Alabama, USA.
Mer'Eb, M M (2008) GREENOMETER-7: A tool to assess the sustainability of a building's life cycle at the conceptual design phase. DEng thesis, Cleveland State University, USA.
Migliaccio, G C; Guindani, M; D'Incognito, M and Zhang, L (2013) Empirical assessment of spatial prediction methods for location cost-adjustment factors. Journal of Construction Engineering and Management, 139(7), pp. 858-869. ISSN 0733-9364
Mills, A; Harris, D and Skitmore, M (2003) The accuracy of housing forecasting in Australia. Engineering, Construction and Architectural Management, 10(4), pp. 245-253. ISSN 0969-9988
Miskawi, Z (1993) A numerical analysis method for computing schedule and resource forecasting for industrial projects. Construction Management and Economics, 11(6), pp. 411-420. ISSN 01446193
Mitchell, Z; Hildreth, J and Vorster, M (2011) Using the cumulative cost model to forecast equipment repair costs: Two different methodologies. Journal of Construction Engineering and Management, 137, pp. 817-822. ISSN 0733-9364
Mitra, A and Munir, K (2019) Influence of big data in managing cyber assets. Built Environment Project and Asset Management, 9(4), pp. 503-514. ISSN 2044-124X
Moffatt, S (2014) Resilience and competing temporalities in cities. Building Research & Information, 42(2), pp. 202-220. ISSN 0961-3218
Mohammadi, P; Asgari, S; Rashidi, A and Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6): 04025052, ISSN 0733-9364
Mohammed Abdelkader, E; Zayed, T; Elshaboury, N and Taiwo, R (2025) A hybrid Bayesian optimization-based deep learning model for modeling the condition of saltwater pipes in Hong Kong. International Journal of Construction Management, 25(1), pp. 46-62. ISSN 1562-3599
Mohseni, H; Setunge, S; Zhang, G and Wakefield, R (2017) Markov process for deterioration modeling and asset management of community buildings. Journal of Construction Engineering and Management, 143(6): 04017003, ISSN 0733-9364
Molenaar, K R and Songer, A D (1998) Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6), pp. 467-479. ISSN 0733-9364
Momade, M H; Durdyev, S; Dixit, S; Shahid, S and Alkali, A K (2024) Modeling labor costs using artificial intelligence tools. International Journal of Building Pathology and Adaptation, 42(6), pp. 1263-1281. ISSN 2398-4708
Moreno, M; Ortiz, R and Ortiz, P (2024) Remote sensing to assess the risk for cultural heritage: Forecasting potential collapses due to rainfall in historic fortifications. International Journal of Building Pathology and Adaptation, 42(1), pp. 92-113. ISSN 23984708
Mostofi, F; Tokdemir, O B and Toǧan, V (2023) Comprehensive root cause analysis of construction defects using semisupervised graph representation learning. Journal of Construction Engineering and Management, 149(9): 04023079, ISSN 0733-9364
Mostofi, F; Tokdemir, O B; Toǧan, V and Arditi, D (2024) Predicting the cost of rework in high-rise buildings using graph convolutional networks. Journal of Construction Engineering and Management, 150(8): 04024085, ISSN 0733-9364
Mungodla, S G; Linganiso, L Z; Mlambo, S and Motaung, T (2019) Economic and technical feasibility studies: Technologies for second generation biofuels. Journal of Engineering, Design and Technology, 17(4), pp. 670-704. ISSN 1726-0531
Mutti, C d N and Hughes, W P (2002) Cash flow management in construction firms. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Myrvang, R and Liu, C Y A (2025) Beyond traditional methods: Enhancing cost escalation forecasting in commercial construction amid economic turbulence. Journal of Construction Engineering and Management, 151(2): 04024201, ISSN 0733-9364
N, H. K. and Padala, S. P. S. (2026) A bibliometric review of digital twin-enabled technologies for construction project monitoring and control. Built Environment Project and Asset Management, 16(3), pp. 441-460. ISSN 2044-124X
Naji, K; Gunduz, M and Salat, F (2021) Assessment of preconstruction factors in sustainable project management performance. Engineering, Construction and Architectural Management, 28(10), pp. 3060-3077. ISSN 0969-9988
Naoui, M A; Lejdel, B; Ayad, M; Amamra, A and kazar, O (2021) Using a distributed deep learning algorithm for analyzing big data in smart cities. Smart and Sustainable Built Environment, 10(1), pp. 90-105. ISSN 2046-6099
Napolitan, C L (1995) Improvement to the forecast precision of the factor model for masonry productivity. PhD thesis, Pennsylvania State University, USA.
Narbaev, T and De Marco, A (2014) Combination of growth model and earned schedule to forecast project cost at completion. Journal of Construction Engineering and Management, 140(1): 04013038, ISSN 0733-9364
Nasirzadeh, F; Kabir, H M D; Akbari, M; Khosravi, A; Nahavandi, S and Carmichael, D G (2020) ANN-based prediction intervals to forecast labour productivity. Engineering, Construction and Architectural Management, 27(9), pp. 2335-2351. ISSN 0969-9988
Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. PhD thesis, University of Alberta, Canada.
Navon, R (1995) Resource-based model for automatic cash-flow forecasting. Construction Management and Economics, 13(6), pp. 501-510. ISSN 01446193
Newell, G and Karantonis, A (2003) The predictive accuracy of investor sentiment for commercial property in Australia. Journal of Financial Management of Property and Construction, 8(3), pp. 117-128. ISSN 1366-4387
Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193
Ng, S T; Fan, R Y C and Wong, J M W (2011) An econometric model for forecasting private construction investment in Hong Kong. Construction Management and Economics, 29(5), pp. 519-534. ISSN 1466433X
Nguyen, T Q; Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(6): 04023038, ISSN 0733-9364
Nicholas, J; Holt, G D and Mihsein, M (2000) Forecasting construction materials suppliers' financial turnover. Engineering, Construction and Architectural Management, 7(3), pp. 221-231. ISSN 0969-9988
Ning, X; Shan, M; Li, Z and Nie, Z (2025) Prediction of construction material prices based on the sliding window catboost model. Journal of Construction Engineering and Management, 151(12): 04025196, ISSN 0733-9364
Odeyinka, H A; Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(5), pp. 423-439. ISSN 01446193
Odeyinka, H A and Lowe, J G (2001) An evaluation of methodological issues for assessing risk impacts on construction cash flow forecast. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.
Oguz Erkal, E D; Hallowell, M R; Ghriss, A and Bhandari, S (2024) Predicting serious injury and fatality exposure using machine learning in construction projects. Journal of Construction Engineering and Management, 150(3): 04023169, ISSN 0733-9364
Okika, M C; Vermeulen, A and Pretorius, J H C (2025) A systematic approach to identify and manage supply chain risks in construction projects. Journal of Financial Management of Property and Construction, 30(1), pp. 42-66. ISSN 1366-4387
Okoro, C S; Nnaji, C and Adediran, A (2023) Determinants of immersive technology acceptance in the construction industry: Management perspective. Engineering, Construction and Architectural Management, 30(7), pp. 2645-2668. ISSN 0969-9988
Okpala, I; Nnaji, C and Awolusi, I (2022) Wearable sensing devices acceptance behavior in construction safety and health: Assessing existing models and developing a hybrid conceptual model. Construction Innovation, 22(1), pp. 57-75. ISSN 1471-4175
Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364
Oloke, D; Edwards, D J; Wright, B and Love, P E D (2006) A web-based information management system for predicting the breakdown of off-highway plant. Journal of Engineering, Design and Technology, 4(1), pp. 29-45. ISSN 1726-0531
Omoregie, A (2006) Blueprints for infrastructure and service delivery in Sub-Saharan Africa. PhD thesis, De Montfort University, UK.
Onubi, H O; Yusof, N; Hassan, A S and Bahdad, A A S (2023) Forecasting the schedule performance resulting from the adoption of social distancing in construction projects. Engineering, Construction and Architectural Management, 30(8), pp. 3731-3748. ISSN 0969-9988
Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry. PhD thesis, North Carolina State University, USA.
Orgut, R E; Zhu, J; Batouli, M; Mostafavi, A and Jaselskis, E J (2018) Metrics that matter: Core predictive and diagnostic metrics for improved project controls and analytics. Journal of Construction Engineering and Management, 144(11): 04018100, ISSN 0733-9364
Oshidero, D. F. O. and Coley, D. A. (2026) Talking carbon: A lexical approach to predictive embodied carbon analysis via machine learning. Architectural Engineering and Design Management, 22(1), pp. 235-268. ISSN 1745-2007
Oshodi, O; Edwards, D J; lam, K C; Olanipekun, A O and Aigbavboa, C O (2020) Construction output modelling: a systematic review. Engineering, Construction and Architectural Management, 27(10), pp. 2959-2991. ISSN 0969-9988
Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599
Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387
Palaneeswaran, E; Love, P E D; Kumaraswamy, M M and Ng, T S T (2008) Mapping rework causes and effects using artificial neural networks. Building Research & Information, 36(5), pp. 450-465. ISSN 0961-3218
Pareek, P; Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(1), pp. 54-66. ISSN 1562-3599
Park, H-K (2001) Cash flow forecasting model using moving weights of cost categories for general contractor on jobsite. PhD thesis, University of Wisconsin - Madison, USA.
Park, T i (2009) A comprehensive asset management system for sewer infrastructures. PhD thesis, Pennsylvania State University, USA.
Parker, D; MacFarlane, J; Peng, V and Murray, J (2003) Forecasting property market cycles: An application of the RICS model to the Sydney CBD office market. Journal of Financial Management of Property and Construction, 8(3), pp. 178-192. ISSN 1366-4387
Paterson, Ian (1981) Contractors' risk and insurance in the Australian building industry. PhD thesis, University of New South Wales, Australia.
Patil, S; Goudar, M and Kharadkar, R (2022) Neural network-based estimation of lighting condition in indoor environment with improved brain storm algorithm. Journal of Engineering, Design and Technology, 20(6), pp. 1565-1580. ISSN 1726-0531
Patil, S V; Balakrishna Rao, K and Nayak, G (2023) Prediction of recycled coarse aggregate concrete mechanical properties using multiple linear regression and artificial neural network. Journal of Engineering, Design and Technology, 21(6), pp. 1690-1709. ISSN 1726-0531
Pearl, R G; Bowen, P A and Hall, K A (1998) The compilation of a tender submission: The role of method statements and construction planning charts. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Pearl, R G; Bowen, P A and Nkado, R N (1997) A communication-based examination of construction planning and tendering. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988
Peng, M (2006) Item-level quantity-based preliminary cost estimating system for highway structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.
Peng, Min (2006) Item-level quantity-based preliminary cost estimating system for highways structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.
Pereira, P F; Ramos, N M M and Simões, M L (2020) Data-driven occupant actions prediction to achieve an intelligent building. Building Research & Information, 48(5), pp. 485-500. ISSN 0961-3218
Persad, K R (1989) Management of the preconstruction process for highway projects using manpower demand prediction models. PhD thesis, University of Texas at Austin, USA.
Petroutsatou, K and Giannoulis, P (2022) Analysis of construction machinery market: The case of Greece. International Journal of Construction Management, 22(9), pp. 1667-1674. ISSN 1562-3599
Pewdum, W; Rujirayanyong, T and Sooksatra, V (2009) Forecasting final budget and duration of highway construction projects. Engineering, Construction and Architectural Management, 16(6), pp. 544-557. ISSN 0969-9988
Philip, B and AlJassmi, H (2024) Time-series forecasting of road distress parameters using dynamic Bayesian belief networks. Construction Innovation, 24(1), pp. 317-340. ISSN 1471-4175
Pieterse, B; Agyekum, K; Manu, P; Mohandes, S R; Cheung, C and Yunusa-Kaltungo, A (2024) Examining critical project management skills for successful delivery of major maintenance projects: Insights from the United Kingdom energy sector. Engineering, Construction and Architectural Management, 31(4), pp. 1556-1584. ISSN 0969-9988
Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988
Pulket, T (2008) Universal prediction model for construction litigation. PhD thesis, Illinois Institute of Technology, USA.
Pulket, T and Arditi, D (2009) Construction litigation prediction system using ant colony optimization. Construction Management and Economics, 27(3), pp. 241-251. ISSN 1466433X
Pulugurta, H (2007) Development of pavement condition forecasting models. PhD thesis, University of Toledo, USA.
Rafiei, M H and Adeli, H (2016) A novel machine learning model for estimation of sale prices of real estate units. Journal of Construction Engineering and Management, 142(2): 04015066, ISSN 0733-9364
Rajabi Asadabadi, M and Zwikael, O (2024) Unrealistic project goals: Detection and modification. Journal of Construction Engineering and Management, 150(3): 04023166, ISSN 0733-9364
Ramirez Flores, R A (2015) A stochastic approach for pavement condition projections and budget needs for the MTC pavement management system. PhD thesis, University of Texas at El Paso, USA.
Rampini, Luca (2023) Artificial intelligence enhances digital asset management. PhD thesis, Politecnico di Milano, Italy.
Rashid, K M and Behzadan, A H (2018) Risk behavior-based trajectory prediction for construction site safety monitoring. Journal of Construction Engineering and Management, 144(2): 04017106, ISSN 0733-9364
Rashidi, M H and Kashani, H (2023) Bayesian modeling of labor earnings in construction. Journal of Construction Engineering and Management, 149(2): 4022168, ISSN 0733-9364
Ratnasabapathy, S; Alashwal, A and Perera, S (2021) Investigation of waste diversion rates in the construction and demolition sector in Australia. Built Environment Project and Asset Management, 11(3), pp. 427-439. ISSN 2044-124X
Rener, A T (2022) Innovative methodologies to enhance productivity, supply chain, and sustainability in industrialized construction. PhD thesis, Lawrence Technological University, USA.
Reyes Veras, P; Renukappa, S and Suresh, S (2022) Awareness of big data concept in the Dominican Republic construction industry: An empirical study. Construction Innovation, 22(3), pp. 465-486. ISSN 1471-4175
Rodrigo, N; Omrany, H; Chang, R and Zuo, J (2024) Leveraging digital technologies for circular economy in construction industry: A way forward. Smart and Sustainable Built Environment, 13(1), pp. 85-116. ISSN 2046-6099
Roghabadi, M A and Moselhi, O (2022) Forecasting project duration using risk-based earned duration management. International Journal of Construction Management, 22(16), pp. 3077-3087. ISSN 1562-3599
Rosenfeld, Y and Warszawski, A (1993) Forecasting methodology of national demand for construction labour. Construction Management and Economics, 11(1), pp. 18-29. ISSN 01446193
Rozenfeld, O; Sacks, R and Rosenfeld, Y (2009) 'Chaste': Construction hazard assessment with spatial and temporal exposure. Construction Management and Economics, 27(7), pp. 625-638. ISSN 1466433X
Rudeli, N; Santilli, A; Puente, I and Viles, E (2017) Statistical model for schedule prediction: Validation in a housing-cooperative construction database. Journal of Construction Engineering and Management, 143(11): 04017083, ISSN 0733-9364
Runeson, K G (1988) Methodology and method for price-level forecasting in the building industry. Construction Management and Economics, 6(1), pp. 49-55. ISSN 01446193
Sadeghi, S.; Niu, C.; Marjani, T. and Lotfi, R. (2026) Machine learning-enabled construction project management: Systematic review, comparative performance synthesis and implementation framework. Built Environment Project and Asset Management, 16(3), pp. 461-483. ISSN 2044-124X
Sadeh, H; Mirarchi, C and Pavan, A (2021) Integrated approach to construction risk management: Cost implications. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364
Said, H (2016) Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms. Journal of Construction Engineering and Management, 142(2): 04015071, ISSN 0733-9364
Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175
Salama, M; Al-Sharif, F; Kaka, A P and Leishman, C (2006) Cost modelling for standardised design projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175
Salem, O M (1999) Infrastructure construction and rehabilitation: Risk-based life cycle cost analysis. PhD thesis, University of Alberta, Canada.
Salhab, D; Pourrahimian, E; Lindhard, S M and Hamzeh, F (2025) Patterns, 4D simulations, and artificial intelligence-driven insights: Redefining construction workspace management. Journal of Construction Engineering and Management, 151(8): 04025099, ISSN 0733-9364
Salman, B and Gursoy, B (2022) Markov chain pavement deterioration prediction models for local street networks. Built Environment Project and Asset Management, 12(6), pp. 853-870. ISSN 2044-124X
Sammour, F; Alkailani, H; Sweis, G J; Sweis, R J; Maaitah, W and Alashkar, A (2024) Forecasting demand in the residential construction industry using machine learning algorithms in Jordan. Construction Innovation, 24(5), pp. 1228-1254. ISSN 1471-4175
Sanders, S R (1989) An analysis of factors affecting labor productivity in masonry construction. PhD thesis, Pennsylvania State University, USA.
Sanders, S R and Thomas, H R (1993) Masonry productivity forecasting model. Journal of Construction Engineering and Management, 119(1), pp. 163-179. ISSN 0733-9364
Santos, Raphael Lucio Reis dos (2023) Development of a prediction model for generation of construction and demolition waste for proposing a management network in medium-sized municipalities. PhD thesis, Centro Federal de Educação Tecnológica de Minas Gerais, Brazil.
Sanyal, A P and Bhattacharya, S P (2024) A comparative analysis between CBR based prediction models and mra models for high-rise construction delay prediction. International Journal of Construction Management, 24(2), pp. 124-136. ISSN 1562-3599
Sartori, I; Bergsdal, H; Muller, D B and Brattebø, H (2008) Towards modelling of construction, renovation and demolition activities: Norway's dwelling stock, 1900-2100. Building Research & Information, 36(5), pp. 412-425. ISSN 0961-3218
Sassano, G (2022) Optimism bias and cost overruns: experimenting on the internal and external views in resources and time estimation. PhD thesis, University College London, UK.
Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988
Seo, W; Kim, B; Bang, S and Kang, Y (2024) Identifying key financial variables predicting the financial performance of construction companies. Journal of Construction Engineering and Management, 150(3): 04024007, ISSN 0733-9364
Sepp nen, O (2009) Empirical research on the success of production control in building construction projects. PhD thesis, Helsinki University of Technology, Finland.
Seppänen, O; Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(6), pp. 608-624. ISSN 01446193
Seppänen, O (2025) Integrated forecasting approach for takt and location-based scheduling. Journal of Construction Engineering and Management, 151(12): 04025199, ISSN 0733-9364
Seresht, N G (2022) Energy-smart buildings: A conceptual framework to improve building's energy performance. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.
Serugga, J (2020) A decision support system for benefits realisation in front end design of construction projects in dynamic contexts. PhD thesis, University of Huddersfield, UK.
Shahandashti, S M and Ashuri, B (2013) Forecasting Engineering News-Record construction cost index using multivariate time series models. Journal of Construction Engineering and Management, 139(9), pp. 1237-1243. ISSN 0733-9364
Shahedi, F. and Abrishami, S. (2026) Adaptive construction scheduling with AI in 4D/5D BIM: Integrating weather data and activity-based costing. Smart and Sustainable Built Environment, pp. 1-15. ISSN 2046-6099
Shao, B; Meng, J and Che, W (2025) Long-term energy usage prediction in public buildings using aggregated modal decomposition and gru. Journal of Construction Engineering and Management, 151(8): 04025092, ISSN 0733-9364
Sharma, N and Laishram, B (2025) Unveiling the path to the cost of quality implementation in the construction industry: Multivariate analysis. Journal of Construction Engineering and Management, 151(2): 04024202, ISSN 0733-9364
Sharma, N; Sood, R and Laishram, B (2025) A hybrid PLS-SEM-ANN approach to COQ optimization. Construction Management and Economics, 43(11), pp. 938-960. ISSN 0144-6193
Shayboun, M; Koch, C and Kifokeris, D (2021) A comparison of accident causation models (ACMS) and machine learning (ML) for applied analysis within accident reports. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Shiha, A; Elazhary, M and El-Adaway, I H (2025) Price adjustment clauses: Enhanced price volatility forecasting for construction materials. Journal of Construction Engineering and Management, 151(9): 04025121, ISSN 0733-9364
Shiha, A and El-adaway, I H (2025) Forecasting state-level construction labor earnings for enhanced project cost control: An econometric and deep-learning analysis of the leading economic indicators. Journal of Construction Engineering and Management, 151(12): 04025198, ISSN 0733-9364
Shirazi, D H and Toosi, H (2023) Deep multilayer perceptron neural network for the prediction of Iranian dam project delay risks. Journal of Construction Engineering and Management, 149(4): 04023011, ISSN 0733-9364
Shohet, I M and Paciuk, M (2004) Service life prediction of exterior cladding components under standard conditions. Construction Management and Economics, 22(10), pp. 1081-1090. ISSN 01446193
Shohet, I M and Paciuk, M (2006) Service life prediction of exterior cladding components under failure conditions. Construction Management and Economics, 24(2), pp. 131-148. ISSN 01446193
Shojaei Kol Kachi, A (2017) Extending the portfolio and strategic planning horizon by the stochastic forecasting of unknown future projects: A FDOT case study. PhD thesis, University of Florida, USA.
Shokoohi, F. and Vosoughifar, H. (2026) Multi-dimensional sensitivity analysis of lean and sustainable construction: A novel modified trapezoidal DEMATEL–ANP (mtda) approach for integrated project management. International Journal of Construction Management, 26(10), pp. 1999-2017. ISSN 1562-3599
Shorthouse, E (2015) Climate change and buildings: the impact on human health. PhD thesis, University of Exeter, UK.
Shrestha, R; Ko, T and Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4): 04025017, ISSN 0733-9364
Shrestha, Rabin (2024) Prediction of cost and schedule changes in transportation projects through historical bid and change order document analysis – using Oklahoma dot project cases. PhD thesis, University of Nevada, Las Vegas, USA.
Simpeh, E K (2018) The adoption of green building in South Africa. PhD thesis, Nelson Mandela University, South Africa.
Sing, C P; Love, P E D and Tam, C M (2012) Stock-flow model for forecasting labor supply. Journal of Construction Engineering and Management, 138(6), pp. 707-715. ISSN 0733-9364
Sing, C P; Love, P E D and Tarn, C M (2012) Multiplier model for forecasting manpower demand. Journal of Construction Engineering and Management, 138(10), pp. 1161-1168. ISSN 0733-9364
Sing, M C P; Edwards, D J; Liu, H J X and Love, P E D (2015) Forecasting private-sector construction works: VAR model using economic indicators. Journal of Construction Engineering and Management, 141(11): 04015037, ISSN 0733-9364
Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.
Skinner, D (1998) Forecasting models of activity in industrial and commercial building. PhD thesis, University of Salford, UK.
Skitmore, M and Cheung, F K T (2007) Explorations in specifying construction price forecast loss functions. Construction Management and Economics, 25(5), pp. 449-465. ISSN 1466433X
Skitmore, M and Drew, D (2003) The analysis of pre-tender building price forecasting performance: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 36-42. ISSN 0969-9988
Skitmore, R M (2002) Raftery curve construction for tender price forecasts. Construction Management and Economics, 20(1), pp. 83-89. ISSN 01446193
Smadi, O G (2000) Knowledge-based expert system pavement management optimization. PhD thesis, Iowa State University, USA.
Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks). PhD thesis, Purdue University, USA.
Smith, I G N (1995) Rainfall patterns and the acceptability of soils for earthworking. PhD thesis, Heriot-Watt University, UK.
Sohn, T (2009) Determining durations for right-of-way acquisition and utility adjustment on highway projects. PhD thesis, University of Texas at Austin, USA.
Sousa, R L (2010) Risk analysis for tunneling projects. PhD thesis, Massachusetts Institute of Technology, USA.
Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. PhD thesis, University of Manchester, UK.
Ssegawa, J K (2003) A building price index: A case for Botswana. Journal of Financial Management of Property and Construction, 8(1), pp. 17-28. ISSN 1366-4387
Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.
Stojanovic, V; Trapp, M; Richter, R; Hagedorn, B and Döllner, J (2018) Towards the generation of digital twins for facility management based on 3D point clouds. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses. PhD thesis, University of Alabama, USA.
Suarez, J J (2004) A neural network model to predict business failure in construction companies, in the United States of America. PhD thesis, University of Florida, USA.
Sulaimon, I A; Alaka, H; Olu-Ajayi, R; Ahmad, M; Ajayi, S and Hye, A (2024) Effect of traffic data set on various machine-learning algorithms when forecasting air quality. Journal of Engineering, Design and Technology, 22(3), pp. 1030-1056. ISSN 1726-0531
Swei, O (2020) Forecasting infidelity: Why current methods for predicting costs miss the mark. Journal of Construction Engineering and Management, 146(2): 04019100, ISSN 0733-9364
Swei, O; Gregory, J and Kirchain, R (2017) Probabilistic approach for long-run price projections: Case study of concrete and asphalt. Journal of Construction Engineering and Management, 143(1): 05016018, ISSN 0733-9364
Sweis, R J (1999) A model to assess alternative policies to promote the construction industry in developing countries. PhD thesis, Northwestern University, USA.
Syachrani, S (2010) Advanced sewer asset management using dynamic deterioration models. PhD thesis, Oklahoma State University, USA.
Taheri, Ali (2024) The framework of an infrastructure performance model based on the concepts of civil integrated management (CIM). PhD thesis, Florida State University, USA.
Talbot, B (2021) A novel data-driven tool to improve construction schedule accuracy. DProf thesis, Anglia Ruskin University, UK.
Tam, C M and Tong, T K L (2005) Multiple gmdh models for estimating resource requirements. Construction Innovation, 5(2), pp. 115-131. ISSN 1471-4175
Tan, Y; Langston, C; Wu, M and Ochoa, J J (2015) Grey forecasting of construction demand in Hong Kong over the next ten years. International Journal of Construction Management, 15(3), pp. 219-228. ISSN 1562-3599
Tan, Y; Smith, N J and Bower, D A (2003) Improving risk identification by utilizing hybrid intelligent reasoning. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Tang, B Q; Han, J; Guo, G F; Chen, Y and Zhang, S (2019) Building material prices forecasting based on least square support vector machine and improved particle swarm optimization. Architectural Engineering and Design Management, 15(3), pp. 196-212. ISSN 1745-2007
Tang, Y; Lim, P G and Gan, S W (2012) Forecasting capability of a construction organization model: 10 years later. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Tanratanawong, S (2001) A neural network model to forecast construction output in the United Kingdom. PhD thesis, University of Newcastle upon Tyne, UK.
Tanratanawong, S and Scott, S (2000) A neural network model to forecast national construction output. Journal of Financial Management of Property and Construction, 5(1-2), pp. 65-77. ISSN 1366-4387
Tarekegn Gurmu, A (2023) Preconstruction phase management practices enhancing labor productivity in multistory building projects. Journal of Construction Engineering and Management, 149(6): 04023032, ISSN 0733-9364
Taylor, M D (2010) A definition and valuation of the UK offsite construction sector. Construction Management and Economics, 28(8), pp. 885-896. ISSN 1466433X
Taylor, M D (2022) A definition and valuation of the UK offsite construction sector: Ten years on. International Journal of Construction Management, 22(15), pp. 2877-2885. ISSN 1562-3599
Taylor, R G and Bowen, P A (1987) Building price-level forecasting: An examination of techniques and applications. Construction Management and Economics, 5(1), pp. 21-44. ISSN 01446193
Teixeira Brasil, Jose Artur (2025) A digital twin framework for monitoring, modeling, and forecasting the performance of permeable pavement systems. PhD thesis, The University of Texas at San Antonio, USA.
Tembo, C K; Muleya, F and Kanyemba, A (2024) An appraisal of cost management techniques used in the construction industry. International Journal of Construction Management, 24(1), pp. 10-18. ISSN 1562-3599
Thach, H. P.; Nguyen, L. D. and Nguyen, V. T. (2026) Integrating coastal segmentation on predictive modeling for data-driven bridge asset management. International Journal of Construction Management, 26(10), pp. 2228-2244. ISSN 1562-3599
Thiele, Brett James (2024) A financial decision support tool for improved project and portfolio profit performance in project-based organisations. PhD thesis, University of New South Wales, Australia.
Thomas, H R and Sakarcan, A S (1994) Forecasting labor productivity using factor model. Journal of Construction Engineering and Management, 120(1), pp. 228-239. ISSN 0733-9364
Thuc, T; Thanh Thuy, T and Huong, H T L (2023) Multi-hazard risk assessment of typhoon, typhoon-rainfall and post-typhoon-rainfall in the Mid-Central coastal region of Vietnam. International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 402-419. ISSN 1759-5916
Tobolski, M J (2010) Improving the design and performance of concrete bridges in seismic regions. PhD thesis, University of California, San Diego, USA.
Toma, H M; Abdeen, A H and Ibrahim, A (2025) Predicting construction equipment resale price: Machine learning model. Engineering, Construction and Architectural Management, 32(5), pp. 3453-3464. ISSN 0969-9988
Tomlinson, J (1998) A premises occupancy cost forecasting model. PhD thesis, University of Liverpool, UK.
Tong, T K L; Tam, C M and Chan, A P C (2001) Genetic algorithm optimization in building portfolio management. Construction Management and Economics, 19(6), pp. 601-609. ISSN 01446193
Touran, A (1997) Probabilistic model for tunneling project using Markov chain. Journal of Construction Engineering and Management, 123(4), pp. 444-449. ISSN 0733-9364
Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364
Tran, H; Robert, D; Gunarathna, P and Setunge, S (2023) Stochastic prediction of road network degradation based on field monitoring data. Journal of Construction Engineering and Management, 149(10): 04023096, ISSN 0733-9364
Tsang, Y T; Fung, I W H; Tam, V W Y; Sing, C P and Lu, C T (2017) Development of an accident modelling in the Hong Kong construction industry. International Journal of Construction Management, 17(2), pp. 124-131. ISSN 1562-3599
Tse, R Y C; Ho, C W and Ganesan, S (1999) Matching housing supply and demand: An empirical study of Hong Kong's market. Construction Management and Economics, 17(5), pp. 625-633. ISSN 01446193
Tserng, H P; Liao, H H; Jaselskis, E J; Tsai, L K and Chen, P C (2012) Predicting construction contractor default with barrier option model. Journal of Construction Engineering and Management, 138(5), pp. 621-630. ISSN 0733-9364
Tserng, H P; Liao, H H; Tsai, L K and Chen, P C (2011) Predicting construction contractor default with option-based credit models-models' performance and comparison with financial ratio models. Journal of Construction Engineering and Management, 137(6), pp. 412-420. ISSN 0733-9364
Tsuchiya, Y (2024) Rationality and information advantage of the Japanese government’s construction forecasts over economic development. Construction Management and Economics, 42(8), pp. 671-694. ISSN 01446193
Umar, A A; Zawawi, N A W A and Abdul-Aziz, A R (2019) Exploratory factor analysis of skills requirement for PPP contract governance. Built Environment Project and Asset Management, 9(2), pp. 277-290. ISSN 2044-124X
Un, B; Erdiş, E; Aydınlı, S; Genç, O and Alboga, O (2025) Forecasting the outcomes of construction contract disputes using machine learning techniques. Engineering, Construction and Architectural Management, 32(10), pp. 6421-6444. ISSN 0969-9988
Uwakweh, B O (1985) A conceptual diagnostic manpower planning model for the construction industry in the developing countries. PhD thesis, University of Michigan, USA.
Uwakweh, B O and Maloney, W F (1991) Conceptual model for manpower planning for the construction industry in developing countries. Construction Management and Economics, 9(5), pp. 451-465. ISSN 01446193
V E, S; Shin, C and Cho, Y (2021) Efficient energy consumption prediction model for a data analytic-enabled industry building in a smart city. Building Research & Information, 49(1), pp. 127-143. ISSN 0961-3218
Van Nederveen, S; Beheshti, R and De Ridder, H (2010) Supplier-driven integrated design. Architectural Engineering and Design Management, 6(4), pp. 241-253. ISSN 1745-2007
Vashani, H; Sullivan, J and El Asmar, M (2016) DB 2020: Analyzing and forecasting design-build market trends. Journal of Construction Engineering and Management, 142(6): 04016008, ISSN 0733-9364
Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.
Victoria, M; Perera, S and Davies, A (2015) Developing an early design stage embodied carbon prediction model: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Victoria, M F (2017) Developing decision support models for early stage embodied carbon management in buildings. PhD thesis, Northumbria University, UK.
Vidalakis, C; Tookey, J E and Sommerville, J (2011) Logistics simulation modelling across construction supply chains. Construction Innovation, 11(2), pp. 212-228. ISSN 1471-4175
Vojinovic, Z and Kecman, V (2001) Modelling empirical data to support project cost estimating: Neural networks versus traditional methods. Construction Innovation, 1(4), pp. 227-243. ISSN 1471-4175
Wang, J.; Qu, Z.; Lee, C. Y. and Skitmore, M. (2025) Highway construction cost index forecasting: A hybrid VMD–LSTM–GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193
Wang, J; Qu, Z and Skitmore, M (2026) Predicting construction cost index using a VMD-GRU framework with the mhsa mechanism. Journal of Construction Engineering and Management, 152(1): 04025236, ISSN 0733-9364
Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364
Wang, Z; Yan, X; Liu, Q; Ma, X and Li, H (2026) Vision-based collision prevention on construction sites: Integrating trajectory prediction and uncertainty modeling. Journal of Construction Engineering and Management, 152(1): 04025214, ISSN 0733-9364
Wang, C; Qiao, H; Li, Q; Su, R and An, B (2024) Advances in recycled concrete research: Improving shrinkage for sustainable building applications. Architectural Engineering and Design Management, 20(6), pp. 1589-1611. ISSN 1745-2007
Wang, C H and Mei, Y H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(2), pp. 147-157. ISSN 01446193
Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), pp. 47-63. ISSN 1557-8771
Wang, J; Li, M; Moorhead, M and Skitmore, M (2025) Forecasting financial distress in listed Chinese construction firms: Leveraging ensemble learning and non-financial variables. Construction Management and Economics, 43(3), pp. 175-195. ISSN 0144-6193
Wang, J; Qu, Z; Lee, C Y and Skitmore, M (2025) Highway construction cost index forecasting: A hybrid VMD-LSTM-GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193
Wang, N; Horner, R M W and El-Haram, M (2004) Fuzzy logic approach to a generic elemental whole life costing model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Wang, Y; Shao, Z and Tiong, R L K (2021) Data-driven prediction of contract failure of public-private partnership projects. Journal of Construction Engineering and Management, 147(8): 0002124, ISSN 0733-9364
Wasilewski, S and Andersen, M (2025) Exploring interactions between shading and view using visual difference prediction. Buildings & Cities, 6(1), pp. 281-293. ISSN 2632-6655
Wauters, M and Vanhoucke, M (2015) Study of the stability of earned value management forecasting. Journal of Construction Engineering and Management, 141(4): 04014086, ISSN 0733-9364
Weerasinghe, A; Ramachandra, T and Rotimi, J O B (2016) A simplified model for predicting running cost of office buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Wei, Y (2019) Data-driven approaches for analysis of building energy consumption and indoor occupancy behavior. PhD thesis, University of Nottingham, UK.
Wilmot, C G and Cheng, G (2003) Estimating future highway construction costs. Journal of Construction Engineering and Management, 129(3), pp. 272-279. ISSN 0733-9364
Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364
Windapo, A; Odediran, S; Moghayedi, A; Adediran, A and Oliphant, D (2017) Determinants of building construction costs in South Africa. Journal of Construction Business and Management, 1(1), pp. 8-13. ISSN 2521-0165
Wirahadikusumah, R; Abraham, D M and Castello, J (1999) Markov decision process for sewer rehabilitation. Engineering, Construction and Architectural Management, 6(4), pp. 358-370. ISSN 0969-9988
Wong, C H (2004) Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach. Journal of Construction Engineering and Management, 130(5), pp. 691-698. ISSN 0733-9364
Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193
Wong, J M W; Chan, A P C and Chiang, Y H (2008) Modeling and forecasting construction labor demand: Multivariate analysis. Journal of Construction Engineering and Management, 134(9), pp. 664-672. ISSN 0733-9364
Wong, J M W; Chan, A P C and Chiang, Y H (2010) Modeling construction occupational demand: Case of Hong Kong. Journal of Construction Engineering and Management, 136(9), pp. 991-1002. ISSN 0733-9364
Wong, J M W; Chan, A P C and Chiang, Y H (2011) Construction manpower demand forecasting: A comparative study of univariate time series, multiple regression and econometric modelling techniques. Engineering, Construction and Architectural Management, 18(1), pp. 7-29. ISSN 0969-9988
Wong, J M W; Kong, H and Chiang, Y H (2004) A critical review of forecasting models to predict manpower demand. Construction Economics and Building, 4(2), pp. 43-56. ISSN 2204-9029
Wong, J M W and Ng, S T (2010) Forecasting construction tender price index inm Hong Kong using vector error correction model. Construction Management and Economics, 28(12), pp. 1255-1268. ISSN 1466433X
Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Wong, P S P; Cheung, S O and Hardcastle, C (2007) Embodying learning effect in performance prediction. Journal of Construction Engineering and Management, 133(6), pp. 474-482. ISSN 0733-9364
Wong, T; Wei, Y; Zeng, Y; Jie, Y and Zhao, X (2025) A novel real-time torque prediction of epb shield in mixed ground using machine learning method based on geological knowledge fusion. Journal of Construction Engineering and Management, 151(3): 04025005, ISSN 0733-9364
Woollett, J M (1978) A methodology for financial forecasting in the building industry. PhD thesis, University of Texas at Austin, USA.
Wu, S; Li, M and Zhang, B (2025) How compound psychological empowerment shapes project managers' citizenship behavior: A common agency framework. Construction Management and Economics, 43(12), pp. 1080-1100. ISSN 0144-6193
Wu, Z.; Liu, M.; Ma, G. and Jiang, S. (2026) A hybrid forecasting model to improve cost prediction accuracy in green building projects with machine learning. Engineering, Construction and Architectural Management, 33(4), pp. 3375-3402. ISSN 0969-9988
Wu, H-C (2007) Business failure prediction model for the construction industry using financial ratios and entropy measures with discriminant analysis. PhD thesis, University of Warwick, UK.
Wuni, I Y; Shen, G Q and Osei-Kyei, R (2022) Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2108-2120. ISSN 1562-3599
Xia, X; Xiang, P; Khanmohammadi, S; Gao, T and Arashpour, M (2024) Predicting safety accident costs in construction projects using ensemble data-driven models. Journal of Construction Engineering and Management, 150(7): 04024054, ISSN 0733-9364
Xie, H (2012) Improving dynamic project control in tunnel construction. PhD thesis, University of Alberta, Canada.
Xie, H; Abourizk, S and Zou, J (2012) Quantitative method for updating cost contingency throughout project execution. Journal of Construction Engineering and Management, 138(6), pp. 759-766. ISSN 0733-9364
Xie, L L; Chen, Y; Wu, S; Chang, R D and Han, Y (2024) Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(7), pp. 2852-2877. ISSN 0969-9988
Xu, T and Tiong, R L K (2001) Risk assessment on contractors' pricing strategies. Construction Management and Economics, 19(1), pp. 77-84. ISSN 01446193
Xu, W and Wang, T K (2023) Construction worker safety prediction and active warning based on computer vision and the gray absolute decision analysis method. Journal of Construction Engineering and Management, 149(4): 04023014, ISSN 0733-9364
Xu, X and Zhang, Y (2024) Office property price index forecasting using neural networks. Journal of Financial Management of Property and Construction, 29(1), pp. 52-82. ISSN 1366-4387
Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708
Yan, D; Ding, Y; Sunindijo, R Y; Wang, C C and Yang, Z (2026) Key factors in women's managerial advancement in the construction industry: Insights from machine learning. International Journal of Construction Management, 26(4), pp. 679-693. ISSN 1562-3599
Yan, H.; Liu, C.; Yang, X.; Li, X. and Li, J. (2026) Digital twin-enabled 3D near-misses prediction method based on trajectories and postures for proactive construction safety management. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988
Yang, I T; Hsieh, Y M and Kung, L O (2012) Parallel computing platform for multiobjective simulation optimization of bridge maintenance planning. Journal of Construction Engineering and Management, 138(2), pp. 215-226. ISSN 0733-9364
Yang, J B and Lai, T H (2024) Selecting EVM, esm and EDM(t) for managing construction project schedule. Engineering, Construction and Architectural Management, 31(12), pp. 4988-5006. ISSN 0969-9988
Yang, W and Kohler, N (2008) Simulation of the evolution of the Chinese building and infrastructure stock. Building Research & Information, 36(1), pp. 1-19. ISSN 0961-3218
Yari, N (2018) New model for bridge management system (bms): Bridge repair priority ranking system (brprs), case based reasoning for bridge deterioration, cost optimization, and preservation strategy. PhD thesis, University of New Hampshire, USA.
Yatiwella, T; Ramachandra, T and Sachchithananthan, M (2025) Forecasting embodied carbon emission: Case of two-storey residential buildings in Sri Lanka. Built Environment Project and Asset Management, 15(5), pp. 937-950. ISSN 2044-124X
Ye, S and Liu, Y (2008) Study on development patterns of infrastructure projects. Journal of Construction Engineering and Management, 134(2), pp. 94-102. ISSN 0733-9364
Yeung, D and Skitmore, M (2012) A method for systematically pooling data in very early stage construction price forecasting. Construction Management and Economics, 30(11), pp. 929-939. ISSN 1466433X
Yeung, D K L and Skitmore, M (2005) Data pooling for early-stage price forecasts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Yi, J S (2003) CAMP (CAse Matching Prediction): A dynamic forecasting model for periodic expenditures of residential building projects. PhD thesis, University of Wisconsin - Madison, USA.
Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.
Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.
Yoon, S; Kang, K; Yoon, Y; Hastak, M and Ji, R (2018) Systematic decision-making process for composite pavement maintenance. Journal of Construction Engineering and Management, 144(6): 04018044, ISSN 0733-9364
Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: New methodology and old problems. Construction Management and Economics, 29(7), pp. 653-658. ISSN 1466433X
Yue, J; Li, W; Cheng, J; Xiong, H; Xue, Y; Deng, X and Zheng, T (2023) A dynamic calculation model of the carbon footprint in the life cycle of hospital building: A case study in China. Engineering, Construction and Architectural Management, 30(10), pp. 4735-4761. ISSN 0969-9988
Yun, S and Caldas, C H (2009) Analysing decision variables that influence preliminary feasibility studies using data mining techniques. Construction Management and Economics, 27(1), pp. 73-87. ISSN 1466433X
Zahoor, H; Khan, R M; Nawaz, A; Ayaz, M and Maqsoom, A (2022) Project control and forecast assessment of building projects in Pakistan using earned value management. Engineering, Construction and Architectural Management, 29(2), pp. 842-869. ISSN 0969-9988
Zangeneh, P (2021) Knowledge representation and artificial intelligence for management of socio-technical risks in megaprojects. PhD thesis, University of Toronto, Canada.
Zarghami, S A (2022) Forecasting project duration in the face of disruptive events: A resource-based approach. Journal of Construction Engineering and Management, 148(5): 04022016, ISSN 0733-9364
Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X
Zhang, L (2021) Artificial neural network intelligent technique and multiple nonlinear regression for prediction and optimization of the transmittance of lightpipes and implementation in BIM. PhD thesis, University of Nottingham, UK.
Zhang, M and Ge, S (2022) Vision and trajectory-based dynamic collision prewarning mechanism for tower cranes. Journal of Construction Engineering and Management, 148(7): 04022057, ISSN 0733-9364
Zhang, S; Du, C; Sa, W; Wang, C and Wang, G (2014) Bayesian-based hybrid simulation approach to project completion forecasting for underground construction. Journal of Construction Engineering and Management, 140(1): 04013031, ISSN 0733-9364
Zhang, S; Migliaccio, G C; Zandbergen, P A and Guindani, M (2014) Empirical assessment of geographically based surface interpolation methods for adjusting construction cost estimates by project location. Journal of Construction Engineering and Management, 140(6): 4014015, ISSN 0733-9364
Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing. PhD thesis, University of Florida, USA.
Zhang, X; Shen, L; Xia, B and Skitmore, M (2010) Key competitiveness indicators for new real estate developers. Journal of Financial Management of Property and Construction, 15(2), pp. 143-157. ISSN 1366-4387
Zhang, Y; Liu, L; Song, Z; Zhao, Y and He, S (2024) Enhancing tunnel boring machine penetration rate predictions through particle swarm optimization and elman neural networks. Journal of Construction Engineering and Management, 150(9): 04024116, ISSN 0733-9364
Zhang, Y; Minchin, R E and Agdas, D (2017) Forecasting completed cost of highway construction projects using LASSO regularized regression. Journal of Construction Engineering and Management, 143(10): 04017071, ISSN 0733-9364
Zhao, Y; Chen, W; Arashpour, M; Yang, Z; Shao, C and Li, C (2022) Predicting delays in prefabricated projects: Sd-bp neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29(4), pp. 1753-1776. ISSN 0969-9988
Zheng, X; Chau, K W and Hui, E C M (2012) The impact of property price on construction output. Construction Management and Economics, 30(12), pp. 1025-1037. ISSN 1466433X
Zheng, Y; Tang, L and Chau, K W (2025) BIM investment decision model (BIDM): Evaluation of features and proposal of a regression model based on the LASSO method. Journal of Financial Management of Property and Construction, 30(2), pp. 232-255. ISSN 1366-4387
Zheng, Z; Li, Y and Torres, J (2024) An integrated method of automated layout design and optimization for modular construction. Engineering, Construction and Architectural Management, 31(3), pp. 1016-1036. ISSN 0969-9988
Zhou, Z; Xie, Y; Zhou, L and Zhang, Z (2026) Risk factor analysis of crane accidents based on HFACS in the construction industry. Journal of Construction Engineering and Management, 152(5): 04026036, ISSN 0733-9364
Up a level