Items with Subject: payment
Abbas, N M A (1998) The impact of construction contract models on construction claims in Saudi Arabia. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Abbas, N M A (2007) Construction claims in Saudi Arabia: a study of sources and associations of claims. PhD thesis, University of Strathclyde, UK.
Abdallah, A; Doloi, H and Holzer, D (2025) Exploring contextual issues impacting delivery and performance of public sector construction projects in Tanzania. Built Environment Project and Asset Management, 15(2), pp. 228-246. ISSN 2044-124X
Ahmed, M O; Abdul Nabi, M; El-Adaway, I H; Caranci, D; Eberle, J; Hawkins, Z and Sparrow, R (2021) Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11): 05021008, ISSN 0733-9364
Aibinu, A A; Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors' perspectives. Construction Management and Economics, 29(5), pp. 463-481. ISSN 1466433X
Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.
Al-Gahtani, A S Z (1991) Construction claims for public and private projects in Saudi Arabia. DSc thesis, George Washington University, USA.
Alghamdi, A M (2022) A systemic approach for construction contract claims settlement in the Kingdom of Saudi Arabia. PhD thesis, University of Reading, UK.
Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193
Alqershy, M T and Kishore, R (2023) Construction claims prediction using ann models: A case study of the Indian construction industry. International Journal of Construction Management, 23(6), pp. 1097-1108. ISSN 1562-3599
Amadi, A and Higham, A (2016) Geotechnical characterization of cost overrun drivers in highway projects: Predicated on heterogeneous ground conditions in the Niger delta region of Nigeria. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.
Amoo, O; Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in eastern cape South Africa: A case study. Journal of Construction Business and Management, 5(2), pp. 54-67. ISSN 2521-0165
Arewa, A O; Olubodun, F and Peter Swai, L (2024) Exploring nuanced approach to criminalization of late payers in the construction sector. International Journal of Construction Management, 24(10), pp. 1136-1144. ISSN 1562-3599
Asare, E; Owusu-Manu, D G; Ayarkwa, J; Martek, I and Edwards, D J (2026) Empirical perspective of working capital management practices among large building construction firms in Ghana. Construction Innovation, 26(3), pp. 768-785. ISSN 1471-4175
Assaf, G and Assaad, R H (2024) A data-driven decision-support tool for selecting the optimal project delivery method for bundled projects: Integrating machine learning and expert domain knowledge. Journal of Construction Engineering and Management, 150(12): 04024181, ISSN 0733-9364
Ayus, A M B N (1992) Building contract claims: a comparative study (Scotland, England and Malaysia). PhD thesis, University of Aberdeen, UK.
Ball, M and Chambers, M (2009) An incentivisation scheme for a major transportation infrastructure project in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice. PhD thesis, Coventry University, UK.
Bayraktar, M E; Cui, Q; Hastak, M and Minkarah, I (2006) Warranty bonds from the perspective of surety companies. Journal of Construction Engineering and Management, 132(4), pp. 333-337. ISSN 0733-9364
Bloore, R D S (1991) The ascertainment of claims for delay and disruption. PhD thesis, University of Surrey, UK.
Br chner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(2), pp. 91-101. ISSN 0969-9988
Brand, M C and Uher, T (2010) Follow-up empirical study of the performance of the New South Wales construction industry security of payment legislation. International Journal of Law in the Built Environment, 2(1), pp. 7-25. ISSN 1756-1450
Campbell, A J (2012) The politics of canal construction: the Ashby Canal, 1781-1804. PhD thesis, University of Leicester, UK.
Carroll, L C (2024) Framework to develop a credible final accounts system for South African construction projects. PhD thesis, University of Pretoria, South Africa.
Chan, A P C and Yeong, C M (1995) A comparison of strategies for reducing variations. Construction Management and Economics, 13(6), pp. 467-473. ISSN 01446193
Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364
Christian, J (2002) An overview of systems utilizing information and communication technologies: Five research case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Cooper, T E (1994) A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document. PhD thesis, Auburn University, USA.
Deacon, H A and Kajimo-Shakantu, K (2024) The prevalence of claims under the JBCC principal building agreement in South Africa. International Journal of Construction Management, 24(3), pp. 331-338. ISSN 1562-3599
Diekmann, J E and Nelson, M C (1985) Construction claims: Frequency and severity. Journal of Construction Engineering and Management, 111(1), pp. 74-81. ISSN 0733-9364
Dosumu, B A (2022) Development of a construction project risk management framework: A case study of major Nigerian cities. PhD thesis, University of Manchester, UK.
Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387
Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387
Ekung, S; Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: A multivariate analysis. African Journal of Built Environment Research, 5(1), pp. 19-40. ISSN 2414-0236
El Nemr, W (2017) The enforceability of time bar clauses in construction contracts: a comparative analysis between the Egyptian civil code and the English and Welsh common law jurisdictions. PhD thesis, University of Salford, UK.
El-Adaway, I H and Kandil, A A (2009) Contractors' claims insurance: A risk retention approach. Journal of Construction Engineering and Management, 135(9), pp. 819-825. ISSN 0733-9364
El-Adaway, I H and Kandil, A A (2010) Multiagent system for construction dispute resolution (MAS-COR). Journal of Construction Engineering and Management, 136(3), pp. 303-315. ISSN 0733-9364
El-Razek, M E A; Bassioni, H and El-Salam, W A (2007) Investigation into the causes of claims in Egyptian building construction. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling. PhD thesis, Iowa State University, USA.
Emsley, M W; Lowe, D J; Duff, A R; Harding, A and Hickson, A (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20(6), pp. 465-472. ISSN 01446193
Faraji, A; Homayoon Arya, S; Ghasemi, E; Rashidi, M; Perera, S; Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(1), pp. 384-406. ISSN 1471-4175
Foster, R D (1982) Does pictorial documentation improve construction cost control? PhD thesis, Texas A&M University, USA.
Griffiths, R; Lord, W and Coggins, J (2017) Project bank accounts: The second wave of security of payment? Journal of Financial Management of Property and Construction, 22(3), pp. 322-338. ISSN 1366-4387
Hadikusumo, B H W and Tobgay, S (2015) Construction claim types and causes for a large-scale hydropower project in Bhutan. Journal of Construction in Developing Countries, 20(1), pp. 49-63. ISSN 1823-6499
Hajikazemi, S; Aaltonen, K; Ahola, T; Aarseth, W and Andersen, B (2020) Normalising deviance in construction project organizations: A case study on the collapse of Carillion. Construction Management and Economics, 38(12), pp. 1122-1138. ISSN 01446193
Hernández, J M A (2024) Essays on public policy evaluation: The case of spain's supplier payment plan. PhD thesis, University of Exeter, UK.
Hetherton, T and Charlson, J (2015) When statutes collide: Potential recovery of own party adjudication costs. International Journal of Law in the Built Environment, 7(3), pp. 214-230. ISSN 1756-1450
Ho, S P and Liu, L Y (2004) Analytical model for analyzing construction claims and opportunistic bidding. Journal of Construction Engineering and Management, 130(1), pp. 94-104. ISSN 0733-9364
Huang, Y; Chen, R; Guo, P and Duan, Z (2025) Research on contractor claim strategy based on the principle of maximizing profits by using evolutionary game model. Engineering, Construction and Architectural Management, 32(12), pp. 8423-8444. ISSN 0969-9988
Huang, Y L and Pi, C C (2014) Real-option valuation of build-operate-transfer infrastructure projects under performance bonding. Journal of Construction Engineering and Management, 140(5): 04013068, ISSN 0733-9364
Hussey, H J (2023) Establishing criteria for descriptions of building work which include practicality and intricacy. PhD thesis, University of Northumbria at Newcastle, UK.
Hymes, S J (2010) Front end specifications and the propagation of construction claims. DSc thesis, Washington University in St. Louis, USA.
Hymes, S J (2011) Front-end specifications and construction claims. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 139-146. ISSN 17514312
Jensen, D A (2010) A longitudinal study of a Type I differing conditions claim: Investigating the contractor's failure to meet the reasonable prudent standard. Construction Management and Economics, 28(1), pp. 63-74. ISSN 1466433X
Jergeas, G F and Hartman, F T (1994) Contractors' construction-claims avoidance. Journal of Construction Engineering and Management, 120(3), pp. 553-560. ISSN 0733-9364
Jergeas, G F and Revay, S O (1993) Quantifying construction claims using the differential cost method. Construction Management and Economics, 11(2), pp. 163-166. ISSN 01446193
Kikwasi, G (2016) Risk handling options: Is insurance a fair option to transfer construction risks in Tanzanian construction industry? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Kikwasi, G J (2023) Claims in construction projects: How causes are linked to effects? Journal of Engineering, Design and Technology, 21(6), pp. 1710-1724. ISSN 1726-0531
Kilian, J J and Gibson, G E (2005) Construction litigation for the U.S. Naval facilities engineering command, 1982-2002. Journal of Construction Engineering and Management, 131(9), pp. 945-952. ISSN 0733-9364
Kim, Y; Kim, K and Shin, D (2005) Delay analysis method using delay section. Journal of Construction Engineering and Management, 131(11), pp. 1155-1164. ISSN 0733-9364
Kululanga, G K; Kuotcha, W; McCaffer, R and Edum-Fotwe, F (2001) Construction contractors' claim process framework. Journal of Construction Engineering and Management, 127(4), pp. 309-314. ISSN 0733-9364
Kumaraswamy, M M (1997) Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 4(2), pp. 95-111. ISSN 0969-9988
Kumaraswamy, M M; Chan, D W M; Dissanayaka, S M and Yogeswaran, K (1997) Mapping methodologies and mixing methods in construction management research. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Kumaraswamy, M M; Nadarajah, R; Palaneeswaran, E and Rahman, M M (2001) Dealing with delays in evaluating extensions of time. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Larkin, K; Odeyinka, H and Eadie, R (2012) An exploration of theoretical concepts and methods for assessing risk impacts on the variability between contract sum and final account in design and build projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Laryea, S (2016) Compensation events in NEC3 contracts: Case studies from South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 49-64. ISSN 17514304
Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304
Lessani, A (2016) Decision analysis in construction claims. PhD thesis, University of Maryland, College Park, USA.
Loke, M K; Lee, W P and Yap, J B H (2025) Effective practical strategies for statutory adjudication in construction disputes: Perspectives from adjudicators. International Journal of Construction Management, 25(12), pp. 1488-1499. ISSN 1562-3599
Lu, W; Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(4), pp. 448-463. ISSN 0969-9988
Lu, W; Zhang, L and Li, Z (2015) Influence of negotiation risk attitude and power on behaviors and outcomes when negotiating construction claims. Journal of Construction Engineering and Management, 141(2): 04014069, ISSN 0733-9364
Lurie, J (2008) On-demand performance bonds: Reducing the risk of abuse. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 121-125. ISSN 17514312
Luvara, V G M and Benjamin, M (2025) Unveiling factors influencing the duration of arbitration practice in the Tanzania construction industry. International Journal of Building Pathology and Adaptation, 43(6), pp. 1612-1633. ISSN 2398-4708
Manu, E (2014) Supply chain management practices in construction and inter-organisational trust dynamics. PhD thesis, University of Wolverhampton, UK.
Maqsoom, A; Wazir, S J; Choudhry, R M; Thaheem, M J and Zahoor, H (2020) Influence of perceived fairness on contractors' potential to dispute: Moderating effect of engineering ethics. Journal of Construction Engineering and Management, 146(1): 4019090, ISSN 0733-9364
Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.
McDonald, P R (1984) Construction claims costing for owners and contractors. Construction Management and Economics, 2(1), pp. 1-12. ISSN 01446193
Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988
Mewomo, M C (2019) The construction industry stakeholders preliminary views on the proposed South African prompt payment and statutory adjudication regulations. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364
Moura, H and Teixeira, J C (2007) Types of construction claims: A Portuguese survey. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.
Nasirzadeh, F; Carmichael, D G; Jarban, M J and Rostamnezhad, M (2019) Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims. Engineering, Construction and Architectural Management, 26(7), pp. 1261-1276. ISSN 0969-9988
Ndekugri, I (1999) Performance bonds and guarantees: Construction owners and professionals beware. Journal of Construction Engineering and Management, 125(6), pp. 428-436. ISSN 0733-9364
Nguyen, V T; Do, S T; Tran, C N N and Aung, Z M (2025) Developing a Bayesian belief network model for quantifying and predicting claim causes-related schedule delays. International Journal of Construction Management, 25(1), pp. 32-45. ISSN 1562-3599
Niu, J (2014) Ontology-based semantic interpretation framework for legal analysis of construction claims. PhD thesis, University of Florida, USA.
Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(3), pp. 281-295. ISSN 2044-124X
Olatunde, N A; Awodele, I A and Ramabodu, M S (2026) Delivery strategies of private building projects amid hyper-inflationary trends in Southwest Nigeria. International Journal of Construction Management, 26(3), pp. 482-495. ISSN 1562-3599
Omopariola, E D and Windapo, A O (2019) Domino effect of timely payment of contractors on project and organisation performance. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Ovararin, N (2001) Quantifying productivity loss due to field disruptions in masonry construction. PhD thesis, University of Texas at Austin, USA.
Parchami Jalal, M; Yavari Roushan, T; Noorzai, E and Alizadeh, M (2020) A BIM-based construction claim management model for early identification and visualization of claims. Smart and Sustainable Built Environment, 10(2), pp. 227-257. ISSN 2046-6099
Perera, B A K S; Perera, C S R and Jayalath, C (2022) Contractor’s perspective on key performance indicators of cost control in Asian, middle eastern, and European construction projects. International Journal of Construction Education and Research, 18(3), pp. 217-233. ISSN 1557-8771
Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.
Prasad, K V; Vasugi, V; Venkatesan, R and Bhat, N S (2019) Critical causes of time overrun in Indian construction projects and mitigation measures. International Journal of Construction Education and Research, 15(3), pp. 216-238. ISSN 1557-8771
Prasad K V; Vasugi V; Venkatesan R and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(1), pp. 58-78. ISSN 1366-4387
Prinsloo, H F (2016) Toward a decision framework for the analysis of construction claims. PhD thesis, University of Pretoria, South Africa.
Proverbs, D G; Holt, G D and Cheok, H Y (2000) Construction industry problems: The views of UK construction directors. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Rai, H; Jagannathan, M and Venkata Santosh Kumar, D (2021) Claim tenability assessment in Indian real estate projects using ann and decision tree models. Built Environment Project and Asset Management, 11(3), pp. 468-487. ISSN 2044-124X
Randolph Thomas, H and Napolitan, C L (1995) Quantitative effects of construction changes on labor productivity. Journal of Construction Engineering and Management, 121(3), pp. 290-296. ISSN 0733-9364
Ren, Z (2002) A multi-agent systems approach to construction claims negotiation. PhD thesis, Loughborough University, UK.
Ren, Z; Anumba, C J and Ugwu, O (2000) Towards a multi-agent system for construction claims negotiation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Ren, Z; Anumba, G J and Ugwu, O O (2001) Construction claims management: Towards an agent-based approach. Engineering, Construction and Architectural Management, 8(3), pp. 185-197. ISSN 0969-9988
Rosenfeld, Y (2014) Root-cause analysis of construction-cost overruns. Journal of Construction Engineering and Management, 140(1): 04013039, ISSN 0733-9364
Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193
Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques. PhD thesis, Iowa State University, USA.
Rustom, R N (2006) Formulation of generic simulation models for analyzing construction claims. Construction Economics and Building, 6(2), pp. 11-19. ISSN 2204-9029
Scott, Denis James (2025) A proof of concept of a project bank account (PBA) blockchain payment application for the construction industry. PhD thesis, University College London, UK.
Scott, S and Harris, R A (2004) United Kingdom construction claims: Views of professionals. Journal of Construction Engineering and Management, 130(5), pp. 734-741. ISSN 0733-9364
Semple, C; Hartman, F T and Jergeas, G (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), pp. 785-795. ISSN 0733-9364
Shahhosseini, V and Hajarolasvadi, H (2021) A conceptual framework for developing a BIM-enabled claim management system. International Journal of Construction Management, 21(2), pp. 208-222. ISSN 1562-3599
Shawa, H H (1995) Project related finance for construction contractors operating in the United Arab Emirates. PhD thesis, Loughborough University, UK.
Sheamar, S; Wedawatta, G; Tennakoon, M; Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: An exploratory study from a contractors' perspective. Journal of Financial Management of Property and Construction, 29(2), pp. 211-228. ISSN 1366-4387
Shoniwa, Kuda John (2024) The use of integrated project delivery (IPD) to reduce construction claims in South African mining capital projects. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Shrestha, R B and Ogunlan, S (2006) Comparative study of power purchase agreements in the Nepalese environment. Journal of Financial Management of Property and Construction, 11(3), pp. 133-148. ISSN 1366-4387
Shrestha, R B and Ogunlana, S (2007) Direct stakeholder's perception of PPA clauses in the Nepalese environment. Journal of Construction in Developing Countries, 12(2), pp. 21-41. ISSN 1823-6499
Ssegawa, J K; Rwelamila, P D and Mogome, M G (2020) The challenges of closing construction projects final accounts in Botswana local authorities. Journal of Construction Business and Management, 4(1), pp. 13-23. ISSN 2521-0165
Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction. PhD thesis, University of Colorado at Boulder, USA.
Stanford, M S and Molenaar, K R (2018) Influence of simplified procurement methods on competition for public sector construction. Journal of Construction Engineering and Management, 144(2): 04017105, ISSN 0733-9364
Stevens, J D (1981) A study of the relationship between perturbations in construction time schedules and potential construction claims. PhD thesis, University of Washington, USA.
Stewardson, A; Edwards, D J; Asamoah, E; Aigbavboa, C O; Lai, J H K and El-Gohary, H (2023) The late payment epidemic in UK construction. Journal of Financial Management of Property and Construction, 28(3), pp. 374-397. ISSN 1366-4387
Swai, L L P and Arewa, A O (2018) Potentiality of emerging technologies to minimise late-payments quandary in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Taggart, M; Koskela, L and Rooke, J (2012) Collaborative supply chain practices during severe economic downturn in the republic of Ireland. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Taher, N A b A (2009) Understanding and preventing construction conflict, claims and disputes: a critical in-depth study into their causes and recommendations to control in the United Arab Emirates. PhD thesis, University of South Wales, UK.
Tsai, I T (2007) Default and renegotiation: Financial structure and incentive in public-private partnership contracts. PhD thesis, Massachusetts Institute of Technology, USA.
Uher, T and Brand, M (2007) A comparative analysis of the operation of 'compulsory rapid adjudication' in New South Wales and New Zealand. Construction Management and Economics, 25(7), pp. 765-775. ISSN 1466433X
White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193
Ye, Y X; Shan, M; Gao, X; Li, Q and Zhang, H (2024) Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques. International Journal of Construction Management, 24(15), pp. 1617-1629. ISSN 1562-3599
Yirenkyi-Fianko, A B and Chileshe, N (2015) An analysis of risk management in practice: The case of Ghana's construction industry. Journal of Engineering, Design and Technology, 13(2), pp. 240-259.
Yiu, T W; Liu, T and Kwok, L C (2018) Explicating the role of relationship in construction claim negotiations. Journal of Construction Engineering and Management, 144(2): 04017114, ISSN 0733-9364
Yogeswaran, K (1998) Sources, causes and minimisation of contractual claims in civil engineering projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Yogeswaran, K and Kumaraswamy, M M (1999) To instruct or not? The engineer's dilemma. Construction Management and Economics, 17(6), pp. 731-743. ISSN 01446193
Yogeswaran, K; Kumaraswamy, M M and Miller, D R A (1997) Perceived sources and causes of construction claims. Journal of Construction Procurement, 3(3), pp. 3-26. ISSN 1358-9180
Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.
Zaneldin, E (2005) Construction claims in the united arab emirates: Types, causes, and frequency. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Zaneldin, E K (2020) Investigating the types, causes and severity of claims in construction projects in the UAE. International Journal of Construction Management, 20(5), pp. 385-401. ISSN 1562-3599
Zhang, L (2019) To insist or to concede? Chinese contractors' behavioural strategies when handling disputed construction claims. PhD thesis, University of Manchester, UK.
Zhang, Y (2018) An investigation of trust between parties in construction claims using reciprocity theory of social exchange. PhD thesis, University of Hong Kong, Hong Kong.