Items with Subject: partnership management
Abadi, A A; Poerbo, H W; Yuwono, T and Isnandya, A R (2024) Balancing Act: Promoting Affordable Housing in Jakarta's Transit-Oriented Development through Public-Private Partnership. Journal of Construction in Developing Countries, 29(S1), pp. 287-314. ISSN 1823-6499
Abdel Aziz, A M (2007) Successful delivery of public-private partnerships for infrastructure development. Journal of Construction Engineering and Management, 133(12), pp. 918-931. ISSN 0733-9364
Abdel Aziz, A M (2007) A survey of the payment mechanisms for transportation DBFO projects in British columbia. Construction Management and Economics, 25(5), pp. 529-543. ISSN 1466433X
Abdel Aziz, A M (2021) The practice of roadway safety management in public-private partnerships. Journal of Construction Engineering and Management, 147(12): 04021173, ISSN 0733-9364
Abdelshafy, A and Walther, G (2023) Using dynamic-locational material flow analysis to model the development of urban stock. Building Research & Information, 51(1), pp. 5-20. ISSN 0961-3218
Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues. PhD thesis, KTH Royal Institute of Technology, Sweden.
Abdul Karim, Mahmoud (2022) Postwar infrastructure reconstruction in Syria: How public-private partnership impacts economic growth. ArtD thesis, University of Florence, Italy.
Abdul Nifa, F A (2013) Development of a framework for partnering through aligning organizational cultures in the Malaysian construction industry. PhD thesis, University of Salford, UK.
Abdul-Aziz, A R (2012) Control mechanisms exercised in Malaysian housing public-private partnerships. Construction Management and Economics, 30(1), pp. 37-55. ISSN 1466433X
Abdullah, A K and Alshibani, A (2022) Multi-criteria decision-making framework for selecting sustainable private partners for housing projects. Journal of Financial Management of Property and Construction, 27(1), pp. 112-140. ISSN 1366-4387
Abdullahi, D; Renukappa, S; Suresh, S and Oloke, D (2022) Barriers for implementing solar energy initiatives in Nigeria: An empirical study. Smart and Sustainable Built Environment, 11(3), pp. 647-660. ISSN 2046-6099
Abdullahi Ahmed, U; Noor Amila Wan Abdullah, Z and Abdul-Rashid, A-A (2021) Malaysian regulators' ranking of PPP contract governance skills. Built Environment Project and Asset Management, 11(1), pp. 88-102. ISSN 2044-124X
Abeydeera, W P P (2003) The role of social capital in collaborative governmental and non-governmental programmes on poverty reduction in Sri Lanka. PhD thesis, University of Guelph, Canada.
Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.
Abrishami, S; Goulding, J; Pour, R F and Ganah, A (2015) Virtual generative BIM workspace for maximising AEC conceptual design innovation: A paradigm of future opportunities. Construction Innovation, 15(1), pp. 24-41. ISSN 1471-4175
Adams, D and Hastings, E M (2000) Making urban renewal pay: The Hong Kong experience. Journal of Financial Management of Property and Construction, 5(1-2), pp. 79-84. ISSN 1366-4387
Adan, H and Fuerst, F (2015) Modelling energy retrofit investments in the UK housing market: A microeconomic approach. Smart and Sustainable Built Environment, 4(3), pp. 251-267. ISSN 2046-6099
Adelekan, S; Wamuziri, S and Binsardi, B (2013) Evaluation of islamic financing products for housing and infrastructure development. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Adighibe, Charles Nnason (2015) Public private partnership infrastructure delivery: Benefits and costs for society. PhD thesis, Queensland University of Technology, Australia.
Adnan, H (2004) Joint venture projects in Malaysian construction industry: Factors critical to success. PhD thesis, Nottingham Trent University, UK.
Adnan, H B (2004) Joint venture projects in Malaysian Construction Industry Factors Critical to success. PhD thesis, Nottingham Trent University, UK.
Adu Gyamfi, B and Shaw, R (2022) The impact of COVID-19 pandemic on public engagement approaches to disaster preparedness for foreign residents: Case of Tokyo metropolitan area, Japan. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 269-285. ISSN 1759-5916
Adu Gyamfi, T; Aigbavboa, C O and Thwala, W D (2024) Risk resources management influence on public-private partnership risk management in construction industry: Confirmatory factor analysis approach. Journal of Engineering, Design and Technology, 22(5), pp. 1544-1569. ISSN 1726-0531
Afxentiadis, D E (2010) Interpreting a major event organization's efforts to reliably manage information security risks: the case of the Athens 2004 Olympics. PhD thesis, London School of Economics and Political Science, UK.
Aggarwal, T and Solomon, P (2020) Quantitative analysis of the development of smart cities in India. Smart and Sustainable Built Environment, 9(4), pp. 711-726. ISSN 2046-6099
Aghimien, D; Aigbavboa, C; Oke, A; Thwala, W and Moripe, P (2022) Digitalization of construction organisations: A case for digital partnering. International Journal of Construction Management, 22(10), pp. 1950-1959. ISSN 1562-3599
Aghimien, D O; Aigbavboa, C O and Oke, A E (2020) Critical success factors for digital partnering of construction organisations: a Delphi study. Engineering, Construction and Architectural Management, 27(10), pp. 3171-3188. ISSN 0969-9988
Ahadzi, M and Bowles, G (2001) Public-private partnerships in UK infrastructure development: The macroeconomic perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Ahadzi, M and Bowles, G (2001) The private finance initiative: The procurement process in perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Ahadzi, M and Bowles, G (2004) Public-private partnerships and contract negotiations: An empirical study. Construction Management and Economics, 22(9), pp. 967-978. ISSN 01446193
Ahadzi, M K (2004) Public private partnerships in infrastructure procurement: A generic multi-attribute hierarchical model for minimising pre-contract time and cost overruns (GMAHM). PhD thesis, Heriot-Watt University, UK.
Ahmed, A B; Musonda, I and Pretorius, J H C (2023) Dynamics of PPP investment in energy and country governance: Evidence from Sub-Saharan Africa. Built Environment Project and Asset Management, 13(1), pp. 172-184. ISSN 2044-124X
Ahmed Ezzat Othman, A and Sirbadhoo, N (2009) An innovative partnership framework for sustainable development of rural areas in South Africa: The role of project management firms. Journal of Engineering, Design and Technology, 7(3), pp. 243-263. ISSN 1726-0531
Aiolova, Maria (2026) Building AI fluency in the built environment: Developing organizational learning cultures to drive AI adoption and innovation in the architecture, engineering, and construction industry. EdD thesis, Northeastern University, USA.
Akbil, E and Butterworth, C (2025) Urban rooms and the expanded ecology of urban living labs. Buildings & Cities, 6(1), pp. 544-560. ISSN 2632-6655
Akbiyikli, R and Eaton, D (2004) Risk management in PFI procurement: A holistic approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Akerele, D and Gidado, K (2003) The risks and constraints in the implementation of PFI/PPP in Nigeria. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Akinbo, T F; Fagbenle, O I and Amusan, L M (2024) Assessment of knowledge management barriers and improvement strategies on public-private partnership projects in Nigeria. International Journal of Construction Management, 24(9), pp. 1018-1028. ISSN 1562-3599
Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2001) The financial structure of private finance initiative projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Akintoye, A and Main, J (2007) Collaborative relationships in construction: The UK contractors' perception. Engineering, Construction and Architectural Management, 14(6), pp. 597-617. ISSN 0969-9988
Akomea-Frimpong, I; Dzagli, J R A D; Eluerkeh, K; Bonsu, F B; Opoku-Brafi, S; Gyimah, S; Asuming, N A S; Atibila, D W and Kukah, A S (2025) A systematic review of artificial intelligence in managing climate risks of PPP infrastructure projects. Engineering, Construction and Architectural Management, 32(4), pp. 2430-2454. ISSN 0969-9988
Akomea-Frimpong, I; Jin, X; Osei Kyei, R; Tetteh, P A; Tumpa, R J; Ofori, J N A and Pariafsai, F (2024) A review of circular economy models and success factors on public-private partnership infrastructure development. Built Environment Project and Asset Management, 14(1), pp. 109-126. ISSN 2044-124X
Akomea-Frimpong, I; Jin, X and Osei-Kyei, R (2021) Developing a financial risk maturity model for public-private partnership projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Akomea-Frimpong, I; Jin, X; Osei-Kyei, R and Kukah, A S (2023) Public-private partnerships for sustainable infrastructure development in Ghana: A systematic review and recommendations. Smart and Sustainable Built Environment, 12(2), pp. 237-257. ISSN 2046-6099
Akomea-Frimpong, Isaac (2023) Developing a holistic financial risk management framework to optimize financial performance of public-private partnership projects in Ghana. PhD thesis, Western Sydney University, Australia.
Akunyumu, S; Fugar, F D K and Adinyira, E (2023) An assessment of the readiness of construction firms for international construction joint ventures (icjvs) using the verdict model. Journal of Engineering, Design and Technology, 21(5), pp. 1253-1279. ISSN 1726-0531
Al Bunni, A (2020) Refurbishment of UK state school buildings: a strategy and framework for BIM-based digital twinning. PhD thesis, De Montfort University, UK.
Al-Haddad, S (2020) State transportation agencies: A quantitative study on the use of construction engineering and inspection consultants and their impact on project performance. PhD thesis, University of Colorado at Boulder, USA.
Al-Hashimy, H. N. H. and Yao, J. (2026) The moderating effect of internet of things and wearable technologies on enhancing safety management in construction sites. Construction Innovation, 26(5), pp. 1384-1412. ISSN 1471-4175
Al-Saadi, R and Abdou, A (2016) Factors critical for the success of public‒private partnerships in UAE infrastructure projects: Experts' perception. International Journal of Construction Management, 16(3), pp. 234-248. ISSN 1562-3599
Al-Saeed, Y; Edwards, D J and Scaysbrook, S (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK. Construction Innovation, 20(3), pp. 345-377. ISSN 1471-4175
Alaqad, M; Gidado, K; Piroozfar, P; Alkhadim, M and Dorgham, A (2020) Efficacy of value management system in building projects: A UK perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Alarcón-Ramirez, D; Oliveros-Romero, J and Mahn, D (2026) Performance comparison of public–private partnerships and traditionally procured hospitals. Construction Management and Economics, 44(2), pp. 79-97. ISSN 0144-6193
Alasad, R and Motawa, I (2015) Dynamic demand risk assessment for toll road projects. Construction Management and Economics, 33(10), pp. 799-817. ISSN 01446193
Alashwal, A M and Alduais, H S (2019) Performance strategies of Malaysian international contractors during boom and recession periods. International Journal of Construction Management, 19(5), pp. 453-461. ISSN 1562-3599
Alashwal, A M and Ann, T S (2021) Application of home-country joint venture (HJV) for international construction contractors. International Journal of Construction Management, 21(12), pp. 1278-1286. ISSN 1562-3599
Alcaraz Carrillo de Albornoz, V; Ke, Y and Molina Millán, J (2024) Public-private partnerships: Pro-cyclical or counter-cyclical? An empirical study. International Journal of Construction Management, 24(1), pp. 97-107. ISSN 1562-3599
Algithami, S M (2017) The use of a system dynamics approach for modelling maturity of total quality management in Saudi construction firms. PhD thesis, University of Reading, UK.
Alim, S and Polak, J (2016) Public-private partnerships for future urban infrastructure. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 150-158. ISSN 17514304
Alinaitwe, H and Ayesiga, R (2013) Success factors for the implementation of public-private partnerships in the construction industry in Uganda. Journal of Construction in Developing Countries, 18(2), pp. 1-14. ISSN 1823-6499
Aljarbou, M H (2022) A new sustainable public-private partnership (PPP) procurement system for infrastructure projects in the Kingdom of Saudi Arabia. PhD thesis, University of Bristol, UK.
Almarri, K (2019) Perceptions of the attractive factors for adopting public-private partnerships in the UAE. International Journal of Construction Management, 19(1), pp. 57-64. ISSN 1562-3599
Almarri, K (2023) The value for money factors and their interrelationships for smart city public-private partnerships projects. Construction Innovation, 23(4), pp. 815-832. ISSN 1471-4175
Almarri, K and Boussabaine, H (2021) Re-evaluating the risk costing agenda in PPP projects. Built Environment Project and Asset Management, 11(1), pp. 22-37. ISSN 2044-124X
Almarri, K and Boussabaine, H (2025) Critical success factors for public–private partnerships in smart city infrastructure projects. Construction Innovation, 25(2), pp. 224-247. ISSN 1471-4175
Almeile, A M (2021) The role of political and economic stability on the success of public-private partnership (PPP) construction projects from a project management perspective. PhD thesis, University of Southampton, UK.
Alotaibi, S S (2016) The international contractor's decision to invest: a strategic risk management decision model for public private partnership projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.
Alqahtani, D (2022) A sustainability assessment framework for public-private partnerships (PPPs) in highway projects. PhD thesis, Syracuse University, USA.
Alrashidi, M (2021) Multiple perspective of public-private partnership project success: the case of Kuwaiti public housing initiative. PhD thesis, University of Salford, UK.
Alsamarraie, M M; Yousif, O S and Ghazali, F E M (2025) Procurement integrity: Best practices for PPP projects in Iraq and Malaysia. Construction Economics and Building, 25(3-4), pp. 289-310. ISSN 2204-9029
Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships. PhD thesis, George Washington University, USA.
Alves, T d C L; Milberg, C and Walsh, K D (2012) Exploring lean construction practice, research, and education. Engineering, Construction and Architectural Management, 19(5), pp. 512-525. ISSN 0969-9988
Alwan, Z and Gledson, B J (2015) Towards green building performance evaluation using asset information modelling. Built Environment Project and Asset Management, 5(3), pp. 290-303. ISSN 2044-124X
Alzahrani, A (2017) The social value of urban design in mixed use developments in London. PhD thesis, University of Nottingham, UK.
Alzahrani, S (2015) Dynamic simulation of the impact of risk events and risk cost in KSA PPP projects. PhD thesis, University of Liverpool, UK.
Amadi, C; Carrillo, P and Tuuli, M (2018) Stakeholder management in PPP projects: External stakeholders' perspective. Built Environment Project and Asset Management, 8(4), pp. 403-414. ISSN 2044-124X
Amadi, C; Carrillo, P and Tuuli, M (2020) PPP projects: Improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(2), pp. 544-560. ISSN 0969-9988
Amaechi, C V; Ullah, S; Deng, X; Beddu, S B; Ja'e, I A; Mohamed, D B and Syamsir, A (2026) Utilising factor analysis on political risks including strategies of managing firm-specific risk factors for multinational construction projects in Pakistan. Engineering, Construction and Architectural Management, 33(1), pp. 1-27. ISSN 0969-9988
Ambekar, S.; Dhaigude, A. S.; Chatterjee, D. and Tapar, A. V. (2025) Identifying and ranking critical success factors for contractor value addition in the construction sector using the ISM-IRP technique. Construction Innovation, 26(5), pp. 1582-1613. ISSN 1471-4175
Ambituuni, A. (2026) Infrastructure transparency initiative and anticorruption in public infrastructure projects: A principal-agent perspective to the antecedents that enable (or hinder) the effectiveness of transparency. Engineering, Construction and Architectural Management, 33(7), pp. 5934-5957. ISSN 0969-9988
Ameyaw, C; Adjei-Kumi, T and Owusu-Manu, D-G (2015) Exploring value for money (VfM) assessment methods of public-private partnership projects in Ghana: A theoretical framework. Journal of Financial Management of Property and Construction, 20(3), pp. 268-285. ISSN 1366-4387
Ameyaw, E E and Chan, A P C (2015) Risk allocation in public-private partnership water supply projects in Ghana. Construction Management and Economics, 33(3), pp. 187-208. ISSN 01446193
Amiri, O; Ayazi, A; Rahimi, M and Khazaeni, G (2022) Risks of water and wastewater PPP projects: An investors' perspective. Construction Innovation, 22(4), pp. 1104-1121. ISSN 1471-4175
Amoah, C and Bikitsha, L (2022) Emerging contractor's management and planning skills to overcome business risk factors. International Journal of Building Pathology and Adaptation, 40(4), pp. 670-689. ISSN 23984708
Amponsah, C T (2010) Public-private partnerships: Critical success factors for procurements of capital projects. PhD thesis, Capella University, USA.
Amponsah, C T and Forbes, J L (2012) Public-private partnerships: Critical factors for procurement of capital projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 211-221. ISSN 17514312
Ampratwum, G.; Osei-Kyei, R. and Tam, V. W. Y. (2026) Development of a risk assessment model for adopting public-private partnership in building ghana's critical infrastructure resilience against unexpected events. Smart and Sustainable Built Environment, 15(3), pp. 1200-1224. ISSN 2046-6099
Ampratwum, G; Tam, V W Y and Osei-Kyei, R (2023) Critical analysis of risks factors in using public-private partnership in building critical infrastructure resilience: A systematic review. Construction Innovation, 23(2), pp. 360-382. ISSN 1471-4175
Amruthapuri, R S G R (2021) Partnership between diverse stakeholders: A potential solution to issues migrant construction workers face in Bengaluru, India. PhD thesis, University of Pittsburgh, USA.
Amuda-Yusuf, G (2018) Critical success factors for building information modelling implementation. Construction Economics and Building, 18(3), pp. 55-73. ISSN 2204-9029
Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364
Ancapi, F B (2023) Ex ante analysis of circular built environment policy coherence. Buildings & Cities, 4(1), pp. 575-593. ISSN 2632-6655
Andrade de Alencar Loiola, F (2014) The formulation of Public-Private Partnership projects for infrastructure development in Brazil: an institutional analysis of the Municipality of Fortaleza. PhD thesis, University of Sheffield, UK.
Andrew, C and Thoms, I M (2012) Design and construction of the Gautrain rapid rail link. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 41-54. ISSN 17514312
Ankrah, N A and Langford, D A (2005) Architects and contractors: A comparative study of organizational cultures. Construction Management and Economics, 23(6), pp. 595-607. ISSN 01446193
Annor, John (2025) Building pathways to the future: Leveraging collaborative instruction platforms to address global and regional challenges in construction workforce education. PhD thesis, University of Wyoming, USA.
Ansell, M; Evans, R; Holmes, M; Price, A and Pasquire, C (2009) Collaborative working in highways major maintenance projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 59-67. ISSN 17514312
Ansell, M; Evans, R; Holmes, M; Price, A and Pasquire, C (2009) An application of the construction management framework in highways major maintenance. Engineering, Construction and Architectural Management, 16(2), pp. 162-174. ISSN 0969-9988
Ansell, M; Holmes, M; Evans, R; Pasquire, C and Price, A (2009) Delivering best value in highways major maintenance schemes: Case study. Journal of Construction Engineering and Management, 135(4), pp. 235-245. ISSN 0733-9364
Antillon, E I (2016) An exploration of the influence of public-private-partnerships on the life cycle design decision-making process of highway projects. PhD thesis, University of Colorado at Boulder, USA.
Antillon, E I; Molenaar, K R and Javernick-Will, A (2017) Evaluating the effect of contract timing on lifecycle-design innovation in public-private partnerships: Comparative case study of highway projects. Journal of Construction Engineering and Management, 143(4): 05016023, ISSN 0733-9364
Anvuur, A M and Kumaraswamy, M M (2007) Conceptual model of partnering and alliancing. Journal of Construction Engineering and Management, 133(3), pp. 225-234. ISSN 0733-9364
Apostu, A and Drăghici, M (2026) A public theatre as a living lab to create resilience. Buildings & Cities, 7(1), pp. 232-253. ISSN 2632-6655
Arai, K and Morimoto, E (2020) Renovation of the Japanese construction industry: Evaluation of i-Construction from the perspective of construction management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Arai, K and Morimoto, E (2021) What is required for recovering from disaster: Theoretical and empirical verification. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Araujo, L G; Piña, A B S; Aidar, L A G; Coelho, G O and Carvalho, M T M (2019) Recommendations and guidelines for implementing PPP projects: Case of the electricity sector in Brazil. Built Environment Project and Asset Management, 9(2), pp. 262-276. ISSN 2044-124X
Arayici, Y (2004) Requirements engineering in innovative systems developments for the construction industry. PhD thesis, University of Salford, UK.
Arayici, Y and Aouad, G (2004) Industry driven innovative systems development for the construction industry: The DIVERCITY project. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Arayici, Y and Aouad, G (2005) Computer integrated construction: An approach to requirements engineering. Engineering, Construction and Architectural Management, 12(2), pp. 194-215. ISSN 0969-9988
Arditi, D and Chotibhongs, R (2005) Issues in subcontracting practice. Journal of Construction Engineering and Management, 131(8), pp. 866-876. ISSN 0733-9364
Arditi, D and Yasamis, F (1998) Incentive/disincentive contracts: Perceptions of owners and contractors. Journal of Construction Engineering and Management, 124(5), pp. 361-373. ISSN 0733-9364
Arijeloye, B T (2025) Impact of project risk allocation on PPP housing project delivery in Nigeria: Partial least square structural equation modeling approach. Journal of Engineering, Design and Technology, 23(3), pp. 812-829. ISSN 1726-0531
Arijeloye, B T; Aje, I O and Oke, A E (2024) Evaluating the key risk factors in PPP-procured mass housing projects in Nigeria: A Delphi study of industry experts. Journal of Engineering, Design and Technology, 22(1), pp. 60-76. ISSN 1726-0531
Arimoro, A E (2018) Ensuring a healthy legal and regulatory environment for public-private partnership in Nigeria. PhD thesis, Kingston University, UK.
Arowosafe, O I (2018) Contractors’ selection criteria for sustainable infrastructure delivery in Nigeria. PhD thesis, University of Derby, UK.
Arviso, B (2022) Development of the project definition rating index (PDRI) for tribal building projects. PhD thesis, Arizona State University, USA.
Asao, K; Miyamoto, T; Kato, H and Diaz, C E D (2013) Comparison of revenue guarantee programs in build-operation-transfer projects. Built Environment Project and Asset Management, 3(2), pp. 214-227. ISSN 2044-124X
Asare, O; Obi, L and Thurairajah, N (2024) Leveraging circular economy applications in the offsite construction sector through artificial intelligence: A scientometric review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Asgari, S; Afshar, A and Madani, K (2014) Cooperative game theoretic framework for joint resource management in construction. Journal of Construction Engineering and Management, 140(3): 04013066, ISSN 0733-9364
Ashuri, B; Kashani, H; Molenaar, K R; Lee, S and Lu, J (2012) Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management, 138(4), pp. 545-557. ISSN 0733-9364
Ateloye, A; Bowles, G and Oyegoke, A (2016) Private sector participation in Nigeria higher education infrastructure development. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Athamlebbe, R.; Rahman, R. A.; Haron, A. T. and Papadonikolaki, E. (2026) Evaluating competency development strategies to enhance digital leadership in the construction industry: The case of entry-level professionals. Journal of Construction Engineering and Management, 152(9): 04026140, ISSN 0733-9364
Attarzadeh, M; Chua, D K H; Beer, M and Abbott, E L S (2017) Options-based negotiation management of PPP-BOT infrastructure projects. Construction Management and Economics, 35(11-12), pp. 676-692. ISSN 0144-6193
Auchterlounie, T (2006) An example of partnering between a North American speculative housebuilder and their subcontractors. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Awodele, O A (2012) Framework for managing risk in privately financed market projects in Nigeria. PhD thesis, Heriot-Watt University, UK.
Awuah, E (2020) A conceptual risk management framework for public private partnership in developing countries: A Ghanaian and South African perspective. PhD thesis, University of South Africa, South Africa.
Aziz, N M and Zainon, N (2023) Driving factors for lean-BIM implementation in Malaysia's construction industry: Qualitative interview-based study. Smart and Sustainable Built Environment, 12(4), pp. 872-891. ISSN 2046-6099
Baatz, N (2008) Problem management/dispute resolution in partnering contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 115-120. ISSN 17514312
Babalola, A (2023) The role of the private sector in the development of Sub-Sahara Africa: why governance matters. DBA thesis, University of Manchester, UK.
Babatunde, S (2015) Developing public private partnership strategy for infrastructure delivery in Nigeria. PhD thesis, Northumbria University, UK.
Babatunde, S O; Adeniyi, O and Awodele, O A (2017) Investigation into the causes of delay in land acquisition for PPP projects in developing countries. Journal of Engineering, Design and Technology, 15(4), pp. 552-570.
Babatunde, S O; Ekundayo, D; Udeaja, C and Abubakar, U O (2022) An investigation into the sustainability practices in PPP infrastructure projects: A case of Nigeria. Smart and Sustainable Built Environment, 11(1), pp. 110-125. ISSN 2046-6099
Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(6), pp. 875-900. ISSN 0969-9988
Babatunde, S O and Perera, S (2017) Barriers to bond financing for public-private partnership infrastructure projects in emerging markets: A case of Nigeria. Journal of Financial Management of Property and Construction, 22(1), pp. 2-19. ISSN 1366-4387
Babatunde, S O; Perera, S and Zhou, L (2016) Methodology for developing capability maturity levels for PPP stakeholder organisations using critical success factors. Construction Innovation, 16(1), pp. 81-110. ISSN 1471-4175
Babatunde, S O; Perera, S; Zhou, L and Udeaja, C (2016) Stakeholder perceptions on critical success factors for public-private partnership projects in Nigeria. Built Environment Project and Asset Management, 6(1), pp. 74-91. ISSN 2044-124X
Back, W E (1994) Quantifying benefits of electronic technology applied to bulk materials management. PhD thesis, Clemson University, USA.
Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029
Baden-Hellard, R (1996) The partnering philosophy: A procurement strategy for satisfaction through a teamwork solution to project quality. Journal of Construction Procurement, 2(1), pp. 41-55. ISSN 1358-9180
Badenfelt, U (2010) I trust you, I trust you not: A longitudinal study of control mechanisms in incentive contracts. Construction Management and Economics, 28(3), pp. 301-310. ISSN 1466433X
Badger, W W and Mulligan, D E (1995) An implementation model of an alliance. Journal of Construction Procurement, 1(1), pp. 21-37. ISSN 1358-9180
Bai, L; Qu, X; Liu, J and Han, X (2023) Analysis of factors influencing project portfolio benefits with synergy considerations. Engineering, Construction and Architectural Management, 30(7), pp. 2691-2715. ISSN 0969-9988
Bailey, O C (2008) Least-cost energy system design for commercial buildings: The relationship between end-use energy efficiency, distributed generation, and utility energy supply. PhD thesis, Cornell University, USA.
Bakens, W (1997) International trends in building and construction research. Journal of Construction Engineering and Management, 123(2), pp. 102-112. ISSN 0733-9364
Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Bakis, N (2009) Product data sharing in architecture, engineering and construction: Assessment of middleware support and business benefits. PhD thesis, University of Salford, UK.
Ball, D and Fortune, C (2000) Building project procurement processes and the development of environmentally friendly housing schemes. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Ball, M and Chambers, M (2009) An incentivisation scheme for a major transportation infrastructure project in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Balogun, T B; Awonuga, O O and Abowen-Dake, R (2023) Investigating digital technological competencies amongst black Asian minority ethnic construction students in the UK. Journal of Engineering, Design and Technology, 21(6), pp. 1857-1882. ISSN 1726-0531
Bani Hashemi Chaharom, Seyed Yaser (2014) The choice and effects of governance mechanisms for regulating client-contractor relationships in large construction projects. PhD thesis, University of Sydney, Australia.
Bani Ismail, L (2012) An evaluation of the implementation of total quality management within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.
Bani Ismail, Loiy (2012) An evaluation of the implementation of total quality management (TQM) within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.
Bao, F; Chen, C; Chan, A P C; Martek, I and Shrestha, A (2019) Dynamic framework transfer model for public-private partnerships: Lessons from a China water sector case study. Engineering, Construction and Architectural Management, 26(7), pp. 1218-1239. ISSN 0969-9988
Bao, Z; Laovisutthichai, V; Tan, T; Wang, Q and Lu, W (2022) Design for manufacture and assembly (dfma) enablers for offsite interior design and construction. Building Research & Information, 50(3), pp. 325-338. ISSN 0961-3218
Barima, Oliver K B (2007) An examination of the critical variables in the use of the virtual concept in construction value delivery. PhD thesis, University of Hong Kong, Hong Kong.
Barrett, P S and Barrett, L C (2003) Research as a kaleidoscope on practice. Construction Management and Economics, 21(7), pp. 755-766. ISSN 01446193
Basílio, M d S B (2011) Infrastructure public-private partnerships risk factors and agents' participation. PhD thesis, Universidade Tecnica de Lisboa, Portugal.
Bataglin, Fernanda Saidelles (2023) Prescriptive conceptual framework for planning and controlling engineer-to-order industrialized building systems. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.
Bayat, F.; Noorzai, E. and Golabchi, M. (2019) Identifying the most important public–private partnership risks in afghanistan's infrastructure projects. Journal of Financial Management of Property and Construction, 24(3), pp. 309-337. ISSN 1366-4387
Bayat, F; Noorzai, E and Golabchi, M (2019) Identifying the most important public-private partnership risks in Afghanistan's infrastructure projects. Journal of Financial Management of Property and Construction, 24(3), pp. 309-337. ISSN 1366-4387
Beadle, K (2008) Analysis of the design process for low-energy housing. PhD thesis, De Montfort University, UK.
Becerik-Gerber, B; Jazizadeh, F; Li, N and Calis, G (2012) Application areas and data requirements for BIM-enabled facilities management. Journal of Construction Engineering and Management, 138(3), pp. 431-442. ISSN 0733-9364
Bechem, E E (2023) A human touch to public-private partnerships for sustainable infrastructure development in the central African sub-region. PhD thesis, University of Manchester, UK.
Bee-Hua, G (2000) Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: The case of the Singapore residential sector. Construction Management and Economics, 18(2), pp. 209-217. ISSN 01446193
Beliveau, Y J; Michael Williams, J; Gerald King, M and Niles, A R (1995) Real-time position measurement integrated with CAD: Technologies and their protocols. Journal of Construction Engineering and Management, 121(4), pp. 346-354. ISSN 0733-9364
Benachio, G L F; Freitas, M D C D and Tavares, S F (2021) Interactions between lean construction principles and circular economy practices for the construction industry. Journal of Construction Engineering and Management, 147(7): 04021068, ISSN 0733-9364
Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.
Benhaim, M and Birchall, D W (1998) Interfirm relationships within the construction industry: A comparative study between France and the UK. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099
Berente, N; Baxter, R and Lyytinen, K (2010) Dynamics of inter-organizational knowledge creation and information technology use across object worlds: The case of an innovative construction project. Construction Management and Economics, 28(6), pp. 569-588. ISSN 1466433X
Berg, J B; Thuesen, C; Ernstsen, S K and Jensen, P A (2021) Reconfiguring the construction value chain: Analysing key sources of friction in the business model archetypes of AEC companies in strategic partnerships. Construction Management and Economics, 39(6), pp. 533-548. ISSN 01446193
Berg, J B; Thuesen, C and Jensen, P A (2023) Procurement innovation as a vehicle for sustainable change: a case study of the Danish model of strategic partnerships. Construction Innovation, 23(3), pp. 665-682. ISSN 1471-4175
Bing, L and Tiong, R L K (1999) Risk management model for international construction joint ventures. Journal of Construction Engineering and Management, 125(5), pp. 377-384. ISSN 0733-9364
Bird, R and Wearne, S (2017) Contract structure for nuclear power projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 131-137. ISSN 17514304
Birgonul, M T and Ozdogan, I D (2000) Competitiveness of Turkish contractors in international markets. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Birnie, J (1999) Private Finance Initiative (PFI): UK construction industry response. Journal of Construction Procurement, 5(1), pp. 5-14. ISSN 1358-9180
Bisola, T (2024) Business modelling for cloud-based building information modelling (cbim). DE thesis, Technische Universitaet Berlin, Germany.
Biziorek, S; De Marco, A and Castelblanco, G (2023) Public-private partnership national programs through the portfolio perspective: A system dynamics model of the UK PFI/PF2 programs. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Boadi, R (2020) A best practice framework for public-private partnerships (PPPs) in road projects: the case of Ghana. PhD thesis, University of Salford, UK.
Boeing Singh, L and Kalidindi, S N (2009) Criteria influencing debt financing of Indian PPP road projects: A case study. Journal of Financial Management of Property and Construction, 14(1), pp. 34-60. ISSN 1366-4387
Boes H, D A (2013) Public procurement at local level in the Netherlands: Towards a better client-contractor cooperation in a competitive environment. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Bolier, I (2025) From tinkering to transitioning: Cultivating innovation within public agencies operating in the construction industry. PhD thesis, Delft University of Technology, Netherlands.
Bolomope, M T; Baffour Awuah, K G; Amidu, A R and Filippova, O (2020) The challenges of access to local finance for PPP infrastructure project delivery in Nigeria. Journal of Financial Management of Property and Construction, 26(1), pp. 63-86. ISSN 1366-4387
Boothman, C and Craig, N (2016) Five star status in the UK house building sector: A realistic indication of customer satisfaction or pure fantasy. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Bos-de Vos, M; Lieftink, B; Volker, L and Wamelink, H (2014) International collaboration and partnering in the supply chain as business opportunities for architectural firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Botha, P S and Scheepbouwer, E (2015) Christchurch rebuild, New Zealand: Alliancing with a difference. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 121-129. ISSN 17514304
Boudet, H S; Jayasundera, D C and Davis, J (2011) Drivers of conflict in developing country infrastructure projects: Experience from the water and pipeline sectors. Journal of Construction Engineering and Management, 137(7), pp. 498-511. ISSN 0733-9364
Bougrain, F (2012) Energy performance and public private partnership. Built Environment Project and Asset Management, 2(1), pp. 41-55. ISSN 2044-124X
Boukendour, S and Hughes, W P (2014) Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), pp. 279-289. ISSN 01446193
Bowen, P; Allen, Y; Edwards, P; Cattell, K and Simbayi, L (2014) Guidelines for effective workplace HIV/AIDS intervention management by construction firms. Construction Management and Economics, 32(4), pp. 362-381. ISSN 01446193
Bowen, P; Yakubu, K and Govender, R (2022) Predictors of moderate to high risk of alcohol harm among site-based South African construction workers. Construction Management and Economics, 40(6), pp. 442-458. ISSN 01446193
Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(1), pp. 60-74. ISSN 0969-9988
Bowron, J (2002) Re-engineering the project procurement process through concurrent engineering. PhD thesis, Loughborough University, UK.
Boyd, D and Foss, P (1997) Developing intimacy in construction industry groups. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Boyd, D; Xiao, H and Chinyio, E (2005) Can knowledge-event approach work in construction SMEs? In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Boyer, E J (2012) Building capacity for cross-sector collaboration: How transportation agencies develop skills and systems to manage public-private partnerships. PhD thesis, George Washington University, USA.
Brandao, L E T and Saraiva, E (2008) The option value of government guarantees in infrastructure projects. Construction Management and Economics, 26(11), pp. 1171-1180. ISSN 1466433X
Brandli, L L; Jüngles, A E and Heineck, L F (1999) Sub-contracting policies: The case of the construction firms in brazil. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Brandín, R and Abrishami, S (2021) Information traceability platforms for asset data lifecycle: Blockchain-based technologies. Smart and Sustainable Built Environment, 10(3), pp. 364-386. ISSN 2046-6099
Bresnen, M (2009) Living the dream? Understanding partnering as emergent practice. Construction Management and Economics, 27(10), pp. 923-933. ISSN 1466433X
Bresnen, M (2010) Keeping it real? Constituting partnering through boundary objects. Construction Management and Economics, 28(6), pp. 615-628. ISSN 1466433X
Bresnen, M; Lennie, S J and Marshall, N (2025) Partnering in construction re-visited: Gauging progress in industry practice and prospects for advances in academic research. Construction Management and Economics, 43(1), pp. 59-77. ISSN 0144-6193
Bresnen, M and Marshall, N (1998) Partnering strategies and organizational cultures in the construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bresnen, M and Marshall, N (2000) Learning to co-operate and co-operating to learn: Capturing knowledge of partnering in construction. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Bresnen, M and Marshall, N (2000) Partnering in construction: A critical review of issues, problems and dilemmas. Construction Management and Economics, 18(2), pp. 229-237. ISSN 01446193
Bresnen, M and Marshall, N (2000) Building partnerships: Case studies of client-contractor collaboration in the UK construction industry. Construction Management and Economics, 18(7), pp. 819-832. ISSN 01446193
Bresnen, M and Marshall, N (2000) Motivation, commitment and the use of incentives in partnerships and alliances. Construction Management and Economics, 18(5), pp. 587-598. ISSN 01446193
Bresnen, M and Marshall, N (2001) Understanding the diffusion and application of new management ideas in construction. Engineering, Construction and Architectural Management, 8(5-6), pp. 335-345. ISSN 0969-9988
Brewer, G; Gajendran, T; Jefferies, M; McGeorge, D; Rowlinson, S and Dainty, A (2013) Value through innovation in long-term service delivery: Facility management in an Australian PPP. Built Environment Project and Asset Management, 3(1), pp. 74-88. ISSN 2044-124X
Bridgeman, J; Murdock, A; Maple, P; Townley, C and Graham, J (2015) Putting a value on young people's journey into construction: Introducing SROI at construction youth trust. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Bright, S and Dixie, H (2014) Evidence of green leases in England and Wales. International Journal of Law in the Built Environment, 6(1-2), pp. 6-20. ISSN 1756-1450
Brocklehurst, F; Morgan, E; Greer, K; Wade, J and Killip, G (2021) Domestic retrofit supply chain initiatives and business innovations: An international review. Buildings & Cities, 2(1), pp. 533-549. ISSN 2632-6655
Brown, D C (2003) A methodology for selecting the construction team. PhD thesis, University of Southampton, UK.
Bu, Z; Liu, J and Liu, J (2025) Impact of emotions on the behavioral strategies of PPP project stakeholders: An rdeu evolutionary game analysis. Engineering, Construction and Architectural Management, 32(4), pp. 2242-2271. ISSN 0969-9988
Bu, Z; Liu, J and Lu, Z (2025) Research on dynamic profit distribution mechanism and options in PPP project value creation. Journal of Construction Engineering and Management, 151(12): 04025190, ISSN 0733-9364
Budayan, C; Koc, K; Erk, E Y and Tokdemir, O B (2025) Uncovering value creation factors for healthcare public-private partnership (PPP) projects. Engineering, Construction and Architectural Management, 32(8), pp. 5456-5483. ISSN 0969-9988
Bull, R and Janda, K B (2018) Beyond feedback: Introducing the 'engagement gap' in organizational energy management. Building Research & Information, 46(3), pp. 300-315. ISSN 0961-3218
Burke, R (2014) Risk management in Republic of Ireland PPP toll roads. PhD thesis, Queen's University Belfast, UK.
Burl, David Graham (2010) Do joint ventures out perform sole ventures in business and financial terms: The case of the construction and property development sectors. PhD thesis, University of the West of Scotland, UK.
Burtonshaw-Gunn, S A (2001) Strategic supply chain management: Critical success factors for partnering relationships within the UK construction industry. PhD thesis, Manchester Metropolitan University, UK.
Butcher, T and Gentchev, V (2009) Public-private partnerships in central and eastern Europe. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(3), pp. 97-105. ISSN 17514312
Buyukyoran, F and Gundes, S (2018) Optimized real options-based approach for government guarantees in PPP toll road projects. Construction Management and Economics, 36(4), pp. 203-216. ISSN 01446193
Cai, J; Li, S and Cai, H (2019) Empirical analysis of capital structure determinants in infrastructure projects under public-private partnerships. Journal of Construction Engineering and Management, 145(5): 04019032, ISSN 0733-9364
Campbell, J M and Smith, S D (2006) Improving industrial value and longevity of safety management research. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Campo, S (2002) Asymmetry and risk aversion in first -price sealed bid auctions: Identification, estimation, and applications. PhD thesis, University of Southern California, USA.
Cao, D and Wang, G (2014) Contractor-subcontractor relationships with the implementation of emerging interorganizational technologies: Roles of cross-project learning and pre-contractual opportunism. International Journal of Construction Education and Research, 10(4), pp. 268-284. ISSN 1557-8771
Caprario, Rick (2025) Interpersonal communication, relationships, and collaboration among construction specialty contractor project management professionals: A single case study. EdD thesis, Baylor University, USA.
Carbonara, N; Costantino, N and Pellegrino, R (2014) Revenue guarantee in public-private partnerships: A fair risk allocation model. Construction Management and Economics, 32(4), pp. 403-415. ISSN 01446193
Carbonara, N; Costantino, N and Pellegrino, R (2015) A model for designing the tendering process in public-private partnerships. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 146-156. ISSN 17514304
Carbonara, N and Pellegrino, R (2018) Revenue guarantee in public-private partnerships: A win–win model. Construction Management and Economics, 36(10), pp. 584-598. ISSN 01446193
Carmichael, D G; Nguyen, T A and Shen, X (2019) Single treatment of PPP road project options. Journal of Construction Engineering and Management, 145(2): 04018122, ISSN 0733-9364
Carmichael, S (2002) The development of implementation processes for partnering in construction. PhD thesis, University of Salford, UK.
Carmo, Lie Uema do (2012) Construction contracts of large projects. PhD thesis, Universidade de São Paulo, Brazil.
Carty, G J (1995) Construction. Journal of Construction Engineering and Management, 121(3), pp. 319-328. ISSN 0733-9364
Casady, C B (2019) Assessing public-private partnership (PPP) governance, institutionalization, and market maturity in the United States and abroad. PhD thesis, Stanford University, USA.
Casady, C B and Baxter, D (2020) Pandemics, public-private partnerships (PPPs), and force majeure: COVID-19 expectations and implications. Construction Management and Economics, 38(12), pp. 1077-1085. ISSN 01446193
Castelblanco, G; Fenoaltea, E M; De Marco, A and Chiaia, B (2025) Influence of macroeconomic factors on construction costs: An analysis of project cases. Construction Management and Economics, 43(3), pp. 196-212. ISSN 0144-6193
Castelblanco, G; Fenoaltea, E M; De Marco, A; Demagistris, P; Petruzzi, S and Zeppegno, D (2024) Combining stakeholder and risk management: Multilayer network analysis for complex megaprojects. Journal of Construction Engineering and Management, 150(2): 04023161, ISSN 0733-9364
Castelblanco, G and Guevara, J (2024) Stakeholder dynamics: Rethinking roles and responsibilities in user-pay transport PPP projects. Journal of Construction Engineering and Management, 150(8): 05024009, ISSN 0733-9364
Castelblanco, G; Guevara, J and De Marco, A (2024) Crisis management in public–private partnerships: Lessons from the global crises in the xxi century. Built Environment Project and Asset Management, 14(1), pp. 56-73. ISSN 2044-124X
Castelblanco, G; Guevara, J; Mangano, G and Rafele, C (2024) Financial system dynamics model for multidimensional flexibility in toll road PPPs: a life-cycle analysis. Construction Management and Economics, 42(9), pp. 802-821. ISSN 01446193
Castelblanco, G; Guevara, J; Mesa, H and Sanchez, A (2021) Semantic network analysis of literature on public-private partnerships. Journal of Construction Engineering and Management, 147(5): 02041, ISSN 0733-9364
Castelblanco, G; Mangano, G; Zenezini, G and De Marco, A (2025) Once concessioned, twice shy? Asymmetries of "reconcession" in national PPP programs. Construction Management and Economics, 43(6), pp. 405-427. ISSN 0144-6193
Castelblanco, G; Narbaev, T; Osei-Kyei, R; Serikbay, D; Mukashev, Y and Guevara, J (2025) Pandemic risks in PPPs: comparative analysis within developing countries. International Journal of Construction Management, 25(4), pp. 456-468. ISSN 1562-3599
Castro, I; Galán, J L and Casanueva, C (2009) Antecedents of construction project coalitions: A study of the Spanish construction industry. Construction Management and Economics, 27(9), pp. 809-822. ISSN 1466433X
Cayer, A F (2018) Design and profit: Architectural practice in the age of accumulation. PhD thesis, University of California, Los Angeles, USA.
Cerulli, C (2004) Supporting the knowledge management of design decision making in architecture. PhD thesis, University of Sheffield, UK.
Challender, J (2017) Trust in collaborative construction procurement strategies. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 115-124. ISSN 17514304
Challender, J; Farrell, P and Sherratt, F (2014) Partnering in practice: An analysis of collaboration and trust. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(6), pp. 255-264. ISSN 17514304
Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Challender, J; Farrell, P and Sherratt, F (2015) Exploration of factors which affect trust within the context of construction partnering. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Challender, J; Farrell, P and Sherratt, F (2016) Collaborative trust in UK further education (FE) procurement strategies. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Challender, J; Farrell, P and Sherratt, F (2016) Effects of an economic downturn on construction partnering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 159-167. ISSN 17514304
Challender J, F P S F (2013) Collaborative procurement: An exploration of practice and trust in times of austerity. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Chamikara, K L; Perera, B A K S; Raigama Acharige, D P and Ekanayake, B (2026) Adaptability of BIM technology to mitigate the cost overruns in design and build projects. Construction Innovation, 26(2), pp. 464-490. ISSN 1471-4175
Chammout, B and El-Adaway, I H (2025) Circular economy in construction: Decision-making factors and future research avenues. Journal of Construction Engineering and Management, 151(6): 04025059, ISSN 0733-9364
Chan, A P C; Chan, D W M; Chiang, Y H; Tang, B S; Chan, E H W and Ho, K S K (2004) Exploring critical success factors for partnering in construction projects. Journal of Construction Engineering and Management, 130(2), pp. 188-198. ISSN 0733-9364
Chan, A P C; Chan, D W M and Ho, K S K (2003) An empirical study of the benefits of construction partnering in Hong Kong. Construction Management and Economics, 21(5), pp. 523-533. ISSN 01446193
Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364
Chan, A P C; Lam, P T I; Chan, D W M; Cheung, E and Ke, Y (2009) Drivers for adopting public private partnerships-empirical comparison between China and Hong Kong Special Administrative Region. Journal of Construction Engineering and Management, 135(11), pp. 1115-1124. ISSN 0733-9364
Chan, A P C; Lam, P T I; Chan, D W M; Cheung, E and Ke, Y (2010) Critical success factors for PPPs in infrastructure developments: Chinese perspective. Journal of Construction Engineering and Management, 136(5), pp. 484-494. ISSN 0733-9364
Chan, A P L; Chan, A P C and Chan, D W M (2003) A study of managing healthcare projects in Hong Kong. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Chan, C H F (2010) To talk or to fight? Collective effects of strategic, cultural, and institutional factors on investors' renegotiation approach in public-private concessions. PhD thesis, Stanford University, USA.
Chan, M-W (1997) The relationship between project funding and construction systems. PhD thesis, University of Hong Kong, Hong Kong.
Chan, P; Cooper, R and Tzortzopoulos, P (2005) Organizational learning: Conceptual challenges from a project perspective. Construction Management and Economics, 23(7), pp. 747-756. ISSN 01446193
Chandra, V and Loosemore, M (2008) Cultural learning during briefing: A facilities management perspective. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Chandra, V and Loosemore, M (2010) Mapping stakeholders' cultural learning in the hospital briefing process. Construction Management and Economics, 28(7), pp. 761-769. ISSN 1466433X
Chandra, Venny (2007) An investigation of cultural learning during the hospital process from a facilities management perspective. PhD thesis, University of New South Wales, Australia.
Chang, C Y (2013) When might a project company break up? The perspective of risk-bearing capacity. Construction Management and Economics, 31(12), pp. 1186-1198. ISSN 1466433X
Chang, C Y (2013) A critical review of the application of tce in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(2), pp. 99-103. ISSN 1466433X
Chang, C Y (2014) Principal-agent model of risk allocation in construction contracts and its critique. Journal of Construction Engineering and Management, 140(1): 04013032, ISSN 0733-9364
Chang, C Y and Chen, S (2016) Transitional public-private partnership model in China: Contracting with little recourse to contracts. Journal of Construction Engineering and Management, 142(10): 05016011, ISSN 0733-9364
Chang, C Y and Chou, H Y (2014) Transaction-cost approach to the comparative analysis of user-pay and government-pay public-private partnership systems. Journal of Construction Engineering and Management, 140(9): 04014039, ISSN 0733-9364
Chang, C Y and Ko, J W (2017) New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks. Journal of Construction Engineering and Management, 143(1): 06016006, ISSN 0733-9364
Chang, Chen-Yu (2002) An economic interpretation of construction procurement behaviour for the commercial and industrial buildings. PhD thesis, University College London, UK.
Chang, D-W (1987) Performance of the Korea-based construction firms in the Middle East. PhD thesis, New York University, Graduate School of Business Administration, USA.
Chang, H-P (2010) Relationships among supply chain management, strategic alliances, and organizational performance with implications for the construction industry. PhD thesis, Lynn University, USA.
Chang, Y H and Tang, B (2005) Trust, partnership and power in construction: Theory and applications in Hong Kong. Journal of Construction Procurement, 11(2), pp. 94-111.
Chao, C-H (2001) Formulation of an e -business inter-enterprise collaboration for the construction industry. PhD thesis, Northwestern University, USA.
Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387
Checherita, C D (2009) A macroeconomic analysis of investment under public-private partnerships and its policy implications—the case of developing countries. PhD thesis, George Mason University, USA.
Chen, B; Mao, C K and Hu, J L (2015) The optimal debt ratio of public-private partnership projects. International Journal of Construction Management, 15(3), pp. 239-253. ISSN 1562-3599
Chen, C (2005) Entry strategies for international construction markets. PhD thesis, Pennsylvania State University, USA.
Chen, C; Lv, L; Wang, Z and Qiao, R (2023) Bargaining optimization model for risk renegotiation with fairness concerns in infrastructure PPP projects. Engineering, Construction and Architectural Management, 30(9), pp. 3876-3894. ISSN 0969-9988
Chen, G; Zhang, G; Xie, Y M and Jin, X H (2012) Overview of alliancing research and practice in the construction industry. Architectural Engineering and Design Management, 8(2), pp. 103-119. ISSN 1745-2007
Chen, H-L (2002) Development of a systematic integration approach for multi-level cost flow prediction and management. PhD thesis, University of Florida, USA.
Chen, H; Lei, Y; Wu, X and Liu, Y (2025) Evaluation of fuzzy uncertainty risk identification for waste-to-energy public-private partnership projects on the basis of the cloud model and fuzzy cognitive map. Journal of Construction Engineering and Management, 151(12): 04025191, ISSN 0733-9364
Chen, J J and Chambers, D (1999) Sustainability and the impact of Chinese policy initiatives upon construction. Construction Management and Economics, 17(5), pp. 679-687. ISSN 01446193
Chen, L; Manley, K; Lewis, J; Helfer, F and Widen, K (2018) Procurement and governance choices for collaborative infrastructure projects. Journal of Construction Engineering and Management, 144(8): 04018071, ISSN 0733-9364
Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Chen, X (2019) Developing a third party investment partnership framework to encourage low carbon building projects in China. PhD thesis, Northumbria University, UK.
Cheng, M; Chong, H Y; Liu, G and Li, Q (2025) Strategies of perceived justice for added value in public-private partnership (PPP) projects. Engineering, Construction and Architectural Management, 32(12), pp. 8548-8570. ISSN 0969-9988
Cheng, Y H and Hong, W T (2025) An analytical research tool for monitoring stakeholder conflicts in public-private partnership project delivery. Construction Management and Economics, 43(12), pp. 1060-1079. ISSN 0144-6193
Cheng, E W L (2016) Intentions to form project partnering in Hong Kong: Application of the theory of planned behavior. Journal of Construction Engineering and Management, 142(12): 04016075, ISSN 0733-9364
Cheng, E W L and Li, H (2001) Development of a conceptual model of construction partnering. Engineering, Construction and Architectural Management, 8(4), pp. 292-303. ISSN 0969-9988
Cheng, E W L and Li, H (2004) Development of a practical model of partnering for construction projects. Journal of Construction Engineering and Management, 130(6), pp. 790-798. ISSN 0733-9364
Cheng, E W L; li, H; Love, P and Irani, Z (2004) A learning culture for strategic partnering in construction. Construction Innovation, 4(1), pp. 53-65. ISSN 1471-4175
Cheng, M; Liu, G and Xu, Y (2021) Can joint-contract functions promote PPP project sustainability performance? A moderated mediation model. Engineering, Construction and Architectural Management, 28(9), pp. 2667-2689. ISSN 0969-9988
Cheng, M; Liu, L; Cheng, X and Tao, L (2024) Risk analysis of public-private partnership waste-to-energy incineration projects in China: A hybrid fuzzy DEMATEL-ISM approach. Engineering, Construction and Architectural Management, 31(11), pp. 4255-4280. ISSN 0969-9988
Cheng, T; Soo, G; Kumaraswamy, M and Jin, W (2010) Security of payment for Hong Kong construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(1), pp. 17-28. ISSN 17514312
Cheng, Z; Ke, Y; Yang, Z; Cai, J and Wang, H (2020) Diversification or convergence: An international comparison of PPP policy and management between the UK, India, and China. Engineering, Construction and Architectural Management, 27(6), pp. 1315-1335. ISSN 0969-9988
Cherkos, F D and Jha, K N (2021) Drivers of road sector public-private partnership adoption in new and inexperienced markets. Journal of Construction Engineering and Management, 147(3): 04020186, ISSN 0733-9364
Cheung, E; Chan, A P C and Kajewski, S (2009) Enhancing value for money in public private partnership projects: Findings from a survey conducted in Hong Kong and Australia compared to findings from previous research in the UK. Journal of Financial Management of Property and Construction, 14(1), pp. 7-20. ISSN 1366-4387
Cheung, E; Chan, A P C and Kajewski, S (2010) Suitability of procuring large public works by PPP in Hong Kong. Engineering, Construction and Architectural Management, 17(3), pp. 292-308. ISSN 0969-9988
Cheung, F Y K; Rowlinson, S; Jefferies, M and Lau, E (2005) Relationship contracting in Australia. Journal of Construction Procurement, 11(2),
Cheung, S O; Lyeung, D K; Cheung, F K T and Suen, H C H (2002) A planning framework for conditions of contract for use in partnering projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Cheung, Yan Ki Fiona (2011) Relationship management as a strategy for supply chain engagement in the civil engineering construction industry. PhD thesis, Queensland University of Technology, Australia.
Chi, Sae (2018) Developing a methodology for evaluating privately operated toll road projects using stochastic cost-benefit analysis. PhD thesis, Queensland University of Technology, Australia.
Chiang, Lee-Yun (2023) Affordable housing as an infrastructure asset: A public-private partnerships approach. PhD thesis, Griffith University, Australia.
Chiang, Y H and Cheng, E W L (2009) Perception of financial institutions toward financing PFI projects in Hong Kong. Journal of Construction Engineering and Management, 135(9), pp. 833-840. ISSN 0733-9364
Chidiobi, C (2022) Development of frameworks for the management of materials procurement and construction waste for Nigerian contractors. PhD thesis, University of the West of England, Bristol, UK.
Chileshe, N and Kavishe, N (2020) Capacity building for Tanzanian public-private partnerships (PPPs) projects: Challenges and advocated solutions. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Chileshe, N and Kavishe, N (2021) Readiness assessment of public-private partnerships adoption in developing countries: The case of Tanzania. Built Environment Project and Asset Management, 11(1), pp. 71-87. ISSN 2044-124X
Chileshe, N and Kavishe, N (2022) Human capacity building strategies for improving PPP implementation in Tanzanian construction projects. Built Environment Project and Asset Management, 12(6), pp. 906-923. ISSN 2044-124X
Chileshe, N; Kavishe, N and Edwards, D J (2023) Identification of critical capacity building challenges in public-private partnerships (PPPs) projects: The case of Tanzania. International Journal of Construction Management, 23(3), pp. 495-504. ISSN 1562-3599
Chileshe, N; Njau, C W; Kibichii, B K; Macharia, L N and Kavishe, N (2022) Critical success factors for public-private partnership (PPP) infrastructure and housing projects in Kenya. International Journal of Construction Management, 22(9), pp. 1606-1617. ISSN 1562-3599
Chinda, T and Mohamed, S (2008) Structural equation model of construction safety culture. Engineering, Construction and Architectural Management, 15(2), pp. 114-131. ISSN 0969-9988
Chitengi, H S (2015) Deriving lessons for urban planning and housing delivery from the resilience of informal housing systems in Zambia. PhD thesis, University of Dundee, UK.
Chotia, V and Rao, N V M (2018) Infrastructure financing and economic growth in India: An empirical investigation. Journal of Financial Management of Property and Construction, 23(3), pp. 258-273. ISSN 1366-4387
Chowdhury, A N; Chen, P H and Tiong, R L K (2011) Analysing the structure of public-private partnership projects using network theory. Construction Management and Economics, 29(3), pp. 247-260. ISSN 1466433X
Christudason, A; Kenna, P; Amann, W and Mundt, A (2010) Designing a new rental housing law for Romania. International Journal of Law in the Built Environment, 2(2), pp. 157-177. ISSN 1756-1450
Chung, Demi (2012) Contractual approach to optimising risk sharing: A quantitative study of the multidimensional nature of risk in private provision of road infrastructure. PhD thesis, University of Sydney, Australia.
Chung, J H (2015) Optimizing financial structure of transportation public-private partnership infrastructure projects based on traffic revenue risks: Case study of US DBFOM project. PhD thesis, University of Florida, USA.
Clark, R D (2002) Components of selected public -private partnerships to build new schools in California. EdD thesis, University of La Verne, USA.
Clarke, L; Sahin-Dikmen, M and Winch, C (2020) Transforming vocational education and training for nearly zero-energy building. Buildings & Cities, 1(1), pp. 650-661. ISSN 2632-6655
Clarke, L and Wall, C (1998) UK construction skills in the context of European developments. Construction Management and Economics, 16(5), pp. 553-567. ISSN 01446193
Clevenger, C M; Ozbek, M E; Fanning, B and Vonfeldt, S (2015) Case study of work-based learning involving BIM for infrastructure in support of graduate construction research. International Journal of Construction Education and Research, 11(3), pp. 163-178. ISSN 1557-8771
Coates, S P (2013) BIM implementation strategy framework for small architectural practices. PhD thesis, University of Salford, UK.
Cole, B K (2012) Building social infrastructure through public-private partnerships: The case of student housing in public higher education. PhD thesis, Clemson University, USA.
Conley, M A and Gregory, R A (1999) Partnering on small construction projects. Journal of Construction Engineering and Management, 125(5), pp. 320-324. ISSN 0733-9364
Consoli, G (2006) The architect's dilemma: A self reflection in understanding prison design and construction in private prison projects. Construction Economics and Building, 6(2), pp. 1-10. ISSN 2204-9029
Coombe-Davies, M (1985) The laws on contract liability as they specifically relate to architectural practice. PhD thesis, University College Cardiff, UK.
Copray, D and Smith, J (2011) Capstone projects: Industry partnering. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Corley, J; Rowe, A; Tranfield, D; Smart, P; Levene, R; Rogerson, J and Deasley, P (2001) Customer-centred construction: Bringing a service approach through cultural change and team-working. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Correa, J. G. A.; Alves, J. L.; Homrich, A. S. and Carvalho, M. M. d (2026) Evolving skillsets of architecture, engineering and construction sector: Unveiling the interplay between project management, BIM, strategic and operational skills. Engineering, Construction and Architectural Management, 33(3), pp. 2422-2447. ISSN 0969-9988
Costantino, N and Pellegrino, R (2015) Public-private partnership implementation: Cross-case analysis. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(4), pp. 164-176. ISSN 17514304
Costin, G; Nakai Kidd, A; Simon, T and Edwards, D J (2019) Collaborative procurement and private-sector housebuilding and refurbishment works: A pilot study investigation of the UK. International Journal of Building Pathology and Adaptation, 37(5), pp. 699-717. ISSN 23984708
Crespin-Mazet, F (2007) Co-Development as an alternative to competitive bidding in project business. PhD thesis, University of Manchester, UK.
Cripps, A (2004) Cardboard as a construction material: A case study. Building Research & Information, 32(3), pp. 207-219. ISSN 0961-3218
Crompton, L (2016) A standardised incorporated partnering model for the UK construction industry. PhD thesis, University of Central Lancashire, UK.
Crossley, B J (2015) Inter-organisational relationship trust repair: A ranked Delphi study with UK professionals. International Journal of Law in the Built Environment, 7(3), pp. 195-213. ISSN 1756-1450
Crosthwaite, D (2001) The internationalisation of construction professional services: Consulting engineers overseas. PhD thesis, University of Reading, UK.
Cruz, C O and Marques, R C (2013) Exogenous determinants for renegotiating public infrastructure concessions: Evidence from Portugal. Journal of Construction Engineering and Management, 139(9), pp. 1082-1090. ISSN 0733-9364
Cruz, C O; Marques, R C and Pereira, I (2015) Alternative contractual arrangements for urban light rail systems: Lessons from two case studies. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Cruz, N F D and Marques, R C (2012) Delivering local infrastructure through PPPs: Evidence from the school sector. Journal of Construction Engineering and Management, 138(12), pp. 1433-1443. ISSN 0733-9364
Dabarera, G K M; Perera, B A K S and Rodrigo, M N N (2019) Suitability of public-private-partnership procurement method for road projects in Sri Lanka. Built Environment Project and Asset Management, 9(2), pp. 199-213. ISSN 2044-124X
Dado, E (2002) ICT-enabled communication and co-operation in large-scale on -site construction projects. PhD thesis, Delft University of Technology, Netherlands.
Dainty, A R J; Briscoe, G H and Millett, S J (2001) Subcontractor perspectives on supply chain alliances. Construction Management and Economics, 19(8), pp. 841-848. ISSN 01446193
Dainty, A R J and Edwards, D J (2003) Excoriating the truth behind the student recruitment crisis: A comparison between civil engineering and building construction courses. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Damoah, I S; Ayakwah, A; Aryee, K J and Twum, P (2020) The rise of PPPs in public sector affordable housing project delivery in Ghana: Challenges and policy direction. International Journal of Construction Management, 20(6), pp. 690-703. ISSN 1562-3599
Dang, P.; Zhang, T.; Niu, Z.; Gao, S.; Zhao, J. and Geng, L. (2026) Lean-digital transformation in prefabricated construction: A dynamic three-stage pathway configuration. Engineering, Construction and Architectural Management, 33(15), pp. 362-385. ISSN 0969-9988
Dang, P.; Zhang, T.; Niu, Z.; Gao, S.; Zhao, J. and Geng, L. (2026) Lean-digital transformation in prefabricated construction: A dynamic three-stage pathway configuration. Engineering, Construction and Architectural Management, 33(15), pp. 362-385. ISSN 0969-9988
Dansoh, A; Frimpong, S; Ampratwum, G; Dennis Oppong, G and Osei-Kyei, R (2020) Exploring the role of traditional authorities in managing the public as stakeholders on PPP projects: A case study. International Journal of Construction Management, 20(6), pp. 628-641. ISSN 1562-3599
Das, P; Perera, S; Senaratne, S and Osei-Kyei, R (2020) Developing a construction business model transformation canvas. Engineering, Construction and Architectural Management, 28(5), pp. 1423-1439. ISSN 0969-9988
Dave, B A (2013) Developing a construction management system based on lean construction and building information modelling. PhD thesis, University of Salford, UK.
Davey, C L; Lowe, D J and Duff, A R (2001) Generating opportunities for SMEs to develop partnerships and improve performance. Building Research & Information, 29(1), pp. 1-11. ISSN 0961-3218
Davey, C L; McDonald, J; Lowe, D; Duff, R; Powell, J A and Powell, J E (2006) Defects liability management by design. Building Research & Information, 34(2), pp. 145-153. ISSN 0961-3218
Davey, C L; Powell, J A; Cooper, I and Powell, J E (2004) Innovation, construction SMEs and action learning. Engineering, Construction and Architectural Management, 11(4), pp. 230-237. ISSN 0969-9988
Davis, P and Love, P (2011) Alliance contracting: Adding value through relationship development. Engineering, Construction and Architectural Management, 18(5), pp. 444-461. ISSN 0969-9988
Davis, P R and Walker, D H T (2009) Building capability in construction projects: A relationship-based approach. Engineering, Construction and Architectural Management, 16(5), pp. 475-489. ISSN 0969-9988
Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system. PhD thesis, University of Southern California, USA.
Dawood, I (2010) Decision support system (DSS) model to facilitate strategic planning of the housing industry in the developing world. PhD thesis, University of Salford, UK.
Dawood, N N; Hobbs, B and Fanning, A (1999) Standardization of brickwork construction: Process identification. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Dawood, N N; Hobbs, B and Fanning, A (2001) Standardization of brickwork construction: Identification and measurement of standard processes. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
De Araujo, V (2023) Timber construction as a multiple valuable sustainable alternative: Main characteristics, challenge remarks and affirmative actions. International Journal of Construction Management, 23(8), pp. 1334-1343. ISSN 1562-3599
De Biasio, A and Murray, A (2017) The social network of the UK PPP secondary equity market: Returns and competition in an emerging market. Construction Management and Economics, 35(8-9), pp. 468-481. ISSN 0144-6193
De Castro E Silva Neto, D; Cruz, C O; Rodrigues, F and Silva, P (2016) Bibliometric analysis of PPP and PFI literature: Overview of 25 years of research. Journal of Construction Engineering and Management, 142(10): 06016002, ISSN 0733-9364
De Marco, A and Mangano, G (2013) Risk and value in privately financed health care projects. Journal of Construction Engineering and Management, 139(8), pp. 918-926. ISSN 0733-9364
De Silva, D G (2002) Asymmetries in procurement auctions. PhD thesis, University of Oklahoma, USA.
De-Graft, O-M; Kukah, A S; Boateng, F; Asumadu, G and Edwards, D J (2021) Exploring strategies to reduce moral hazard and adverse selection of Ghanaian public-private partnership (PPP) construction projects. Journal of Engineering, Design and Technology, 19(2), pp. 358-372. ISSN 1726-0531
Debela, G Y (2021) Assessment of government policies and regulations in the process of adopting Public-Private Partnership for infrastructure development in Ethiopia. PhD thesis, University of Birmingham, UK.
Debela, G Y (2022) Critical success factors (CSFs) of public-private partnership (PPP) road projects in Ethiopia. International Journal of Construction Management, 22(3), pp. 489-500. ISSN 1562-3599
Deep, A; Nayyer, M I and Annamalai, T R (2025) When sauce for the goose is not sauce for the gander—the divergent impact of transparency law in infrastructure procurement: Evidence from EPC and PPP road projects in India. Construction Management and Economics, 43(11), pp. 922-937. ISSN 0144-6193
Deep, S; Gajendran, T; Jefferies, M and Jha, K N (2025) Defining the attributes of power and dependence in general contractor and subcontractor project-based relationships: Understanding the subcontractor's perspective. Journal of Construction Engineering and Management, 151(10): 04025149, ISSN 0733-9364
Deep, S; Gajendran, T; Jefferies, M; Uggina, V S and Patil, S (2024) Influence of subcontractors' "strategic capabilities" on "power", "dependence" and "collaboration": An empirical analysis in the context of procurement decisions. Engineering, Construction and Architectural Management, 31(2), pp. 571-592. ISSN 0969-9988
Delaney, F T and Wamuziri, S C (2001) Mergers and acquisitions in the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Delaney, F T and Wamuziri, S C (2002) Efficiency and performance effects of mergers and acquisitions in the construction industry. Journal of Financial Management of Property and Construction, 7(3), pp. 141-150. ISSN 1366-4387
Delhi, V S K; Mahalingam, A and Palukuri, S (2012) Governance issues in BOT based PPP infrastructure projects in India. Built Environment Project and Asset Management, 2(2), pp. 234-249. ISSN 2044-124X
Deloly, C; Gall, A R; Moore, G; Bretelle, L; Milner, J; Mohajeri, N; Osrin, D; Salvia, G; Symonds, P; Tsoulou, I; Zimmermann, N; Wilkinson, P and Davies, M (2021) Relationship-building around a policy decision-support tool for urban health. Buildings & Cities, 2(1), pp. 717-733. ISSN 2632-6655
Demirel, H C (2022) Dealing with uncertainty in infrastructure public-private partnership projects. PhD thesis, Delft University of Technology, Netherlands.
Demirel, H Ç; Leendertse, W; Volker, L and Hertogh, M (2017) Flexibility in PPP contracts: Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), pp. 196-206. ISSN 0144-6193
Demirel, H Ç; Volker, L; Leendertse, W and Hertogh, M (2019) Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects. Journal of Construction Engineering and Management, 145(11): 04019073, ISSN 0733-9364
Deng, F (2004) Expert and decision-support system approaches for construction project financing and cash flow management for large infrastructure projects. PhD thesis, State University of New York at Buffalo, USA.
Denny-Smith, G and Loosemore, M (2018) Cultural counterfactuals: Assessing the impact of indigenous social procurement in Australia. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Denny-Smith, G; Loosemore, M; Barwick, D; Sunindijo, R and Piggott, L (2019) Decolonising indigenous social impact research using community-based methods. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Denny-Smith, G; Williams, M; Loosemore, M; Riza Yosia, S and Piggott, L (2024) What social value do indigenous contractors create? Construction Management and Economics, 42(1), pp. 16-34. ISSN 01446193
Denny-Smith, George (2022) The social value of indigenous procurement policies in the Australian construction industry. PhD thesis, University of New South Wales, Australia.
Deshpande, A S (2009) Best practices for the management of design in fast track industrial projects. PhD thesis, University of Cincinnati, USA.
Devkar, G; Palliyaguru, R and Oyegoke, A S (2020) The effects of institutional frameworks on implementation of PPP projects: A comparative perspective in Australia and India. International Journal of Construction Management, 20(6), pp. 720-736. ISSN 1562-3599
Devkar, G A and Kalidindi, S N (2013) Modeling and assessment of competencies in urban local bodies for implementing PPP projects. Built Environment Project and Asset Management, 3(1), pp. 42-57. ISSN 2044-124X
Dewulf, G and Garvin, M J (2020) Responsive governance in PPP projects to manage uncertainty. Construction Management and Economics, 38(4), pp. 383-397. ISSN 01446193
Dey, A; Islam, S T; Paul, B; Bandyopadhyay, S; Sengupta, P; Sanyal, N; Mondal, K P; Jubaer, A and Mitra, R (2022) Waterlogging mitigation and safe water supply: Lessons learnt from low-lying areas of basirhat municipality, India. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 386-403. ISSN 1759-5916
Dhanshyam, M and Srivastava, S K (2021) Governance structures for public infrastructure projects: Public-private management regimes, contractual forms and innovation. Construction Management and Economics, 39(8), pp. 652-668. ISSN 01446193
Diaz Schery, C. A.; Caiado, R. G. G.; Ivson, P.; Santos, R. S. and Thadeu Corseuil, E. (2026) An integrative framework for BIM, digital twin and generative AI convergence in construction: A multi-dimensional analysis of synergies and enabling factors. Smart and Sustainable Built Environment, pp. 1-39. ISSN 2046-6099
Dikmen, I; Birgonul, M T and Arikan, A E (2006) Application of an integrated risk management system (IRMS) to an international construction project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Dikmen, I; Birgonul, M T; Ozorhon, B and Eren, K (2008) Critical success factors for partnering in the Turkish construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Dithebe, K; Aigbavboa, C O; Thwala, W D and Oke, A E (2019) Factor analysis of critical success factors for water infrastructure projects delivered under public-private partnerships. Journal of Financial Management of Property and Construction, 24(3), pp. 338-357. ISSN 1366-4387
Dithebe, K; Thwala, W D D; Aigbavboa, C O; Edwards, D J; Hayhow, S and Talebi, S (2023) Stakeholder management in the alleviation of legal and regulatory disputes in public-private partnership projects in South Africa. Journal of Engineering, Design and Technology, 21(2), pp. 325-342. ISSN 1726-0531
Dixit, V (2022) Risk assessment of different sourcing contract scenarios in project procurement. International Journal of Construction Management, 22(8), pp. 1537-1549. ISSN 1562-3599
Doan, D. T.; Albsoul, H.; Shobha, A. R.; GhaffarianHoseini, A. and Ghaffarianhoseini, A. (2026) An integrated challenge-strategy framework for construction waste management in New Zealand: Behavioural and organisational challenges and strategies. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988
Dodd, M; Madabhushi, N and Lees, R (2025) Placemaking living lab: Creating resilient social and spatial infrastructures. Buildings & Cities, 6(1), pp. 1027-1045. ISSN 2632-6655
Doe, Robert (2017) Integration of computational design tools in the design and production of prefabricated homes. PhD thesis, University of Sydney, Australia.
Dolidze, G and Spillane, J P (2020) Smart city approach to educational campuses: Case study at University of Limerick, Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(3), pp. 95-103. ISSN 17514304
Dolla, T and Laishram, B (2019) Prequalification in municipal solid waste management public-private partnerships of India. Construction Economics and Building, 19(1), pp. 40-56. ISSN 2204-9029
Dolla, T and Laishram, B (2020) Factors affecting public-private partnership preference in Indian municipal waste sector. International Journal of Construction Management, 20(6), pp. 567-584. ISSN 1562-3599
Dolla, T and Laishram, B S (2018) Procurement of low carbon municipal solid waste infrastructure in India through public-private partnerships. Built Environment Project and Asset Management, 8(5), pp. 449-460. ISSN 2044-124X
Doloi, H (2009) Relational partnerships: The importance of communication, trust and confidence and joint risk management in achieving project success. Construction Management and Economics, 27(11), pp. 1099-1109. ISSN 1466433X
Dong, F (2010) Essays in advanced risk management and quantitative strategies in infrastructure finance. PhD thesis, Columbia University, USA.
Dou, Y; Yan, X; Dong, B; Zhong, L and Lin, H (2026) Predicting the interorganizational diffusion of prefabricated construction technology: Agent-based modeling and simulation. Journal of Construction Engineering and Management, 152(3): 04025266, ISSN 0733-9364
Dou, Y.; Zhong, L.; Luo, L. and Lou, H. (2026) Investigating the causes and their interactions leading to supply chain risks in prefabricated construction: Configuration perspective. Journal of Construction Engineering and Management, 152(6): 04026069, ISSN 0733-9364
Dou, Y; Li, T; Li, L; Zhang, Y and Li, Z (2023) Tracking the research on ten emerging digital technologies in the AECO industry. Journal of Construction Engineering and Management, 149(3): 03123003, ISSN 0733-9364
Dou, Y; Xue, X; Wu, C; Luo, X and Wang, Y (2020) Interorganizational diffusion of prefabricated construction technology: Two-stage evolution framework. Journal of Construction Engineering and Management, 146(9): 04020114, ISSN 0733-9364
Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387
Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387
Drejer, I and Vinding, A L (2006) Organisation, 'anchoring' of knowledge, and innovative activity in construction. Construction Management and Economics, 24(9), pp. 921-931. ISSN 1466433X
Drexler Jr, J A and Larson, E W (2000) Partnering: Why project owner-contractor relationships change. Journal of Construction Engineering and Management, 126(4), pp. 293-297. ISSN 0733-9364
Du, Y; Yuan, J; Wang, S; Liu, Y and Zeng, N (2025) Leveraging blockchain to anchor information for supervision in PPP projects: A conceptual framework. Engineering, Construction and Architectural Management, 32(4), pp. 2745-2770. ISSN 0969-9988
Du Plessis, C (1999) Sustainable development demands dialogue between developed and developing worlds. Building Research & Information, 27(6), pp. 379-389. ISSN 0961-3218
Du Plessis, C (2012) Towards a regenerative paradigm for the built environment. Building Research & Information, 40(1), pp. 7-22. ISSN 0961-3218
Duffield, C F and Regan, M (2004) Public private partnership arrangement for the Spencer Street station upgrade in Victoria, Australia. Journal of Financial Management of Property and Construction, 9(3), pp. 163-178. ISSN 1366-4387
Dulaimi, M; Stewart, I and Fenn, P (2006) Strategy: The motivation for innovation. Construction Innovation, 6(3), pp. 173-185. ISSN 1471-4175
Dulaimi, M F (2007) Case studies on knowledge sharing across cultural boundaries. Engineering, Construction and Architectural Management, 14(6), pp. 550-567. ISSN 0969-9988
Dulaimi, M F; Alhashemi, M; Ling, F Y Y and Kumaraswamy, M (2010) The execution of public-private partnership projects in the UAE. Construction Management and Economics, 28(4), pp. 393-402. ISSN 1466433X
Duong, L N K; Wang, J X; Wood, L C; Reiners, T and Koushan, M (2021) The value of incremental environmental sustainability innovation in the construction industry: An event study. Construction Management and Economics, 39(5), pp. 398-418. ISSN 01446193
Eadie, R; Millar, P and Grant, R (2013) PFI/PPP, private sector perspectives of UK transport and healthcare. Built Environment Project and Asset Management, 3(1), pp. 89-104. ISSN 2044-124X
Eadie, R and Potts, S (2016) Innovation partnership procurement: EU directive impact. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 238-247. ISSN 17514304
Eaton, D; Akbiyikli, R; de Lemos, T; Gunnigan, L; Ozen Kutanis, R; Casensky, M; Ladra, J and el Sawalhi, N (2007) An examination of the suitability of a UK PFI model within the Czech Republic, the Republic of Ireland, Palestine (Gaza-West bank), Portugal and Turkey. Construction Innovation, 7(1), pp. 122-142. ISSN 1471-4175
Eaton, D and Morton, P (2008) A minority report: Engaging girls in quantity surveying. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2021) Low-cost housing policies and squatters struggles in Nigeria: The Nigerian perspective on possible solutions. International Journal of Construction Management, 21(11), pp. 1088-1098. ISSN 1562-3599
Ebrahimi, G and Dowlatabadi, H (2019) Perceived challenges in implementing integrated project delivery (IPD): Insights from stakeholders in the U.S. And Canada for a path forward. International Journal of Construction Education and Research, 15(4), pp. 291-314. ISSN 1557-8771
Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Edkins, A J and Smyth, H J (2006) The imperative of trust in PPPs: Evaluations from the provision of 'full service' contracts. Journal of Construction Procurement, 12(1),
Egbu, C O and Bernard, P (2000) Organizational core competencies and their influence on strategic partnering in registered social landlords (rsls). In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Eissa, R; Eid, M S and Elbeltagi, E (2021) Current applications of game theory in construction engineering and management research: A social network analysis approach. Journal of Construction Engineering and Management, 147(7): 0002085, ISSN 0733-9364
Ejohwomu, O A (2007) Modelling the supply and demand for construction and building services skills in the Black Country. PhD thesis, University of Wolverhampton, UK.
Ekanayake, E M A C and Sandanayake, Y G (2017) Live approach: Lean integrated value engineering for construction industry. Built Environment Project and Asset Management, 7(5), pp. 518-533. ISSN 2044-124X
Ekeskär, A; Havenvid, M I and Gustavsson, T K (2019) Horizontal inter-organizational collaboration: The case of third-party logistics. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
El Asmar, M; Hanna, A S and Chang, C K (2009) Monte Carlo simulation approach to support alliance team selection. Journal of Construction Engineering and Management, 135(10), pp. 1087-1095. ISSN 0733-9364
El-Kholy, A M and Akal, A Y (2021) Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects. Engineering, Construction and Architectural Management, 28(10), pp. 3014-3040. ISSN 0969-9988
El-Sheikh, A and Pryke, S D (2010) Network gaps and project success. Construction Management and Economics, 28(12), pp. 1205-1217. ISSN 1466433X
Elbing, C and Devapriya, K A K (2004) Structured risk management process to achieve value for money in Public Private Partnerships. Journal of Financial Management of Property and Construction, 9(3), pp. 121-128. ISSN 1366-4387
Elghaish, F; Abrishami, S; Hosseini, M R and Abu-Samra, S (2020) Revolutionising cost structure for integrated project delivery: A BIM-based solution. Engineering, Construction and Architectural Management, 28(4), pp. 1214-1240. ISSN 0969-9988
Elhag, T; Eapen, S and Ballal, T (2020) Moderating claims and disputes through collaborative procurement. Construction Innovation, 20(1), pp. 79-95. ISSN 1471-4175
Elkhidir, E; Mannakkara, S and Wilkinson, S (2020) Criteria for selecting partner cities in a national-level resilience network. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 443-454. ISSN 1759-5916
Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.
Emmitt, S (2006) Investigating the synergy between teaching and research in a teaching-led university: The case of an architectural technology undergraduate programme. Architectural Engineering and Design Management, 2(1-2), pp. 61-72. ISSN 1745-2007
Emmitt, S; Christoffersen, A K and Sander, D (2004) Design management: A value based approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Emsley, M (2005) A benefits analysis of partnering: A case study of a community primary school. Journal of Financial Management of Property and Construction, 10(1), pp. 69-79. ISSN 1366-4387
Enache-Pommer, E (2010) A synergistic approach to green building delivery, lean principles and building information modeling in the design of healthcare facilities. PhD thesis, Pennsylvania State University, USA.
Enoma, A (2005) The role of facilities management at the design stage. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Eom, C S J; Yun, S H and Paek, J H (2008) Subcontractor evaluation and management framework for strategic partnering. Journal of Construction Engineering and Management, 134(11), pp. 842-851. ISSN 0733-9364
Erfani, A; Cui, Q and Cavanaugh, I (2021) An empirical analysis of risk similarity among major transportation projects using natural language processing. Journal of Construction Engineering and Management, 147(12): 04021175, ISSN 0733-9364
Eriksson, P E (2008) Procurement effects on coopetition in client-contractor relationships. Journal of Construction Engineering and Management, 134(2), pp. 103-111. ISSN 0733-9364
Eriksson, P E (2010) Partnering: What is it, when should it be used, and how should it be implemented? Construction Management and Economics, 28(9), pp. 905-917. ISSN 1466433X
Eriksson, P E (2017) Procurement strategies for enhancing exploration and exploitation in construction projects. Journal of Financial Management of Property and Construction, 22(2), pp. 211-230. ISSN 1366-4387
Eriksson, P E; Atkin, B and Nilsson, T (2009) Overcoming barriers to partnering through cooperative procurement procedures. Engineering, Construction and Architectural Management, 16(6), pp. 598-611. ISSN 0969-9988
Eriksson, P E and Laan, A (2007) Procurement effects on trust and control in client-contractor relationships. Engineering, Construction and Architectural Management, 14(4), pp. 387-399. ISSN 0969-9988
Eriksson, P E; Nilsson, T and Atkin, B (2008) Client perceptions of barriers to partnering. Engineering, Construction and Architectural Management, 15(6), pp. 527-539. ISSN 0969-9988
Eriksson, P E and Pesämaa, O (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(8), pp. 893-901. ISSN 1466433X
Eriksson, P E; Volker, L; Kadefors, A; Lingegård, S; Larsson, J and Rosander, L (2019) Collaborative procurement strategies for infrastructure projects: A multiple-case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(5), pp. 197-205. ISSN 17514304
Erk, E Y; Budayan, C; Koc, K and Tokdemir, O B (2023) Value creation in PPP projects undertaken in the Turkish healthcare industry. Journal of Construction Engineering and Management, 149(11): 04023108, ISSN 0733-9364
Evans, M (2022) Strategic frameworks for managing lean construction on megaprojects: towards global integrated delivery and corporate governance. PhD thesis, University of Bolton, UK.
Evans, M and Farrell, P (2023) A strategic framework managing challenges of integrating lean construction and integrated project delivery on construction megaprojects, towards global integrated delivery transformative initiatives in multinational organisations. Journal of Engineering, Design and Technology, 21(2), pp. 376-416. ISSN 1726-0531
Evans, M; Farrell, P; Mashali, A and Zewein, W (2021) Critical success factors for adopting building information modelling (BIM) and lean construction practices on construction mega-projects: A Delphi survey. Journal of Engineering, Design and Technology, 19(2), pp. 537-556. ISSN 1726-0531
Evans, M; Farrell, P; Zewein, W and Mashali, A (2021) Analysis framework for the interactions between building information modelling (BIM) and lean construction on construction mega-projects. Journal of Engineering, Design and Technology, 19(6), pp. 1451-1471. ISSN 1726-0531
Evdorides, H and Shoji, M (2013) Public-private partnerships for road infrastructure services in Zambia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 277-286. ISSN 17514312
Eyiah-Botwe, E; Aigbavboa, C O and Thwala, W D (2020) Curbing PPP construction projects' failure using enhanced stakeholder management success in developing countries. Built Environment Project and Asset Management, 10(1), pp. 50-63. ISSN 2044-124X
Fabianski, C J C (2017) Complex partnership for the delivery of Urban Rail Infrastructure Project: how culture matters for the treatment of risk and uncertainty. PhD thesis, University College London, UK.
Fahy, P (2007) Cross cultural training and the effective integration of the construction supply chain. PhD thesis, University College London, UK.
Faisal, Fahim (2016) The role of government and development partner certification in public-private partnership infrastructure project financing. PhD thesis, Queensland University of Technology, Australia.
Faisol, N (2010) An investigation of relational contracting norms in construction projects in Malaysia. PhD thesis, Loughborough University, UK.
Faisol, N; Dainty, A R J and Price, A D F (2005) The concept of 'relational contracting' as a tool for understanding inter- organizational relationships in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Famakin, I O; Aje, I O and Ogunsemi, D R (2012) Assessment of success factors for joint venture construction projects in Nigeria. Journal of Financial Management of Property and Construction, 17(2), pp. 153-165. ISSN 1366-4387
Fan, L C N (2001) Strategic quality management for construction organisations. DBA thesis, Brunel University, UK.
Faraziera, M R; Emma, M N and Jamaluddin, Y (2010) Legal issues of partnering in construction industry: Malaysia contract law system. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Fatemi, M N; Okyere, S A; Diko, S K; Abunyewah, M; Kita, M and Rahman, T (2021) Flooding in mega-cities: Using structural equation modeling to assess flood impact in Dhaka. International Journal of Disaster Resilience in the Built Environment, 12(5), pp. 500-514. ISSN 1759-5916
Fathi, M (2020) Public-private partnership contract framework development and project performance analysis compared to design-build in the US highway projects. PhD thesis, University of Nevada, Las Vegas, USA.
Fathi, M and Shrestha, P P (2022) Public-private partnership project performance analysis compared to design-build in highway projects. Journal of Construction Engineering and Management, 148(11): 04022118, ISSN 0733-9364
Fatokun, A; Akintoye, A and Liyanage, C (2015) Renegotiation of public private partnership road contracts: Issues and outcomes. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.
Fauzi, F Z and Kusumasari, B (2020) Public-private partnership in Western and non-Western countries: A search for relevance. Journal of Financial Management of Property and Construction, 26(1), pp. 87-102. ISSN 1366-4387
Fayek, A R and Golabchi, A (2022) Framework for identification of performance metrics for research and development collaborations: Construction innovation centre. Built Environment Project and Asset Management, 12(5), pp. 837-852. ISSN 2044-124X
Fellows, R; Liu, A and Storey, C (2009) Values, power and performance on construction projects: A preliminary investigation. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Feng, K; Xiong, W; Wang, S; Wu, C and Xue, Y (2017) Optimizing an equity capital structure model for public-private partnership projects involved with public funds. Journal of Construction Engineering and Management, 143(9): 04017067, ISSN 0733-9364
Feng, L and Moodley, K (2008) Determinants of local responsiveness of fmncs in mainland China. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ferguson, D W (1993) Public works program management using owner-consultant partnerships: Organizational factors influencing effectiveness. PhD thesis, Claremont Graduate University, USA.
Fernando, P G; Kulatunga, U; Thayaparan, M and Hadiwattege, C (2025) Reforming legal and regulatory structure of public–private partnerships in Sri Lanka. Built Environment Project and Asset Management, 15(2), pp. 211-227. ISSN 2044-124X
Fernie, S and Thorpe, A (2007) Exploring change in construction: Supply chain management. Engineering, Construction and Architectural Management, 14(4), pp. 319-333. ISSN 0969-9988
Ferreira, A C F; Carmo, C S T; Cruz, A S and Faisca, R G (2025) A case study to explore the synergy between HBIM and BEM for maintenance of historical buildings. International Journal of Building Pathology and Adaptation, 43(3), pp. 302-320. ISSN 2398-4708
Ferreira, F; Briga, P; Ramos Teixeira, S and Almeida, F (2025) A platform sandbox for the assessment of municipal sustainable development goals. Journal of Engineering, Design and Technology, 23(2), pp. 599-617. ISSN 1726-0531
Fewings, P and Hodgson, P (2005) Collaboration and learning: A business integration model. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Field, C and Davenport, D (1999) PFI policy since 1996 and the implications for small and medium sized enterprises in the UK construction industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Fischer, K; Leidel, K; Riemann, A and Alfen, H W (2010) An integrated risk management system (IRMS) for PPP projects. Journal of Financial Management of Property and Construction, 15(3), pp. 260-282. ISSN 1366-4387
Fisher, R B (2004) Partnering public sector construction contracts: A conflict avoidance process. PhD thesis, Virginia Commonwealth University, USA.
Fisher, T F and Ranasinghe, M (2001) Culture and foreign companies' choice of entry mode: The case of the Singapore building and construction industry. Construction Management and Economics, 19(4), pp. 343-353. ISSN 01446193
Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments. PhD thesis, Columbia University, USA.
Fitzpatrick, T and Molloy, J (2014) The role of NGOs in building sustainable community resilience. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 292-304. ISSN 1759-5916
Flynn, C (2020) Risk transfer in operational public private partnerships in the education sector. PhD thesis, Queen's University Belfast, UK.
Forbes, D R; Smith, S D and Horner, R M W (2008) A comparison of techniques for identifying risks in sustainability assessment of housing. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Forino, G; von Meding, J K and Brewer, G J (2018) Challenges and opportunities for Australian local governments in governing climate change adaptation and disaster risk reduction integration. International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 258-272. ISSN 1759-5916
Forman, M and Haugbølle, K (2009) Arbitration and expert appraisals of defects in construction: What do companies learn? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Foulds, C; Royston, S; Aggeli, A; Crowther, A and Robison, R (2026) Sharing energy renovations know-how through citizen–professional knowledge networks. Buildings & Cities, 7(1), pp. 341-359. ISSN 2632-6655
Franco, L A (2005) Problem structuring methods for collaboration: A conceptual development, with an application to a construction partnership in the UK. PhD thesis, London School of Economics and Political Science, UK.
Fraser, C and Zarkada-Fraser, A (2001) The philosophy, structure and objectives of research and development in Japan. Construction Management and Economics, 19(8), pp. 831-840. ISSN 01446193
Frederiksen, N and Gottlieb, S C (2020) From partnership to firm: Hybridity as source of routine change. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Fredslund, L; Søder, P H; Hansen, E J d P and Koch, C (2022) An institutional analysis of how the construction industry's complexity affects waste: An alternative response to future market demands for sustainability. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Fu, Y and Zhu, J (2021) Trusted data infrastructure for smart cities: A blockchain perspective. Building Research & Information, 49(1), pp. 21-37. ISSN 0961-3218
Fuller, J; Brown, C J and Crowley, R (2018) Performance-based maintenance contracting in Florida: Evaluation by surveys, statistics, and content analysis. Journal of Construction Engineering and Management, 144(2): 05017021, ISSN 0733-9364
Gade, A N and Opoku, A (2020) Challenges for implementing the Sustainable Development Goals in the Danish construction industry: Building owners' perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Galotti, V (2025) An exploration of design-build risk and project profitability in the architecture, engineering and construction sector. PhD thesis, University of Colorado at Boulder, USA.
Gambatese, J A; Pestana, C and Lee, H W (2017) Alignment between lean principles and practices and worker safety behavior. Journal of Construction Engineering and Management, 143(1): 04016083, ISSN 0733-9364
Gannon, M J and Smith, N J (2011) An effective outline business case to facilitate successful decision-making. Construction Management and Economics, 29(2), pp. 185-197. ISSN 1466433X
Gannon M, M S A J (2013) Tied supply chains in construction projects: Lessons from London underground's public-private-partnership. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Gao, R and Liu, J (2019) Selection of government supervision mode of PPP projects during the operation stage. Construction Management and Economics, 37(10), pp. 584-603. ISSN 01446193
Garnett, J (2002) Work based learning partnerships and structural capital: The case of Middlesex University. DProf thesis, Middlesex University, UK.
Garvin, M J (2010) Enabling development of the transportation public-private partnership market in the United States. Journal of Construction Engineering and Management, 136(4), pp. 402-411. ISSN 0733-9364
Gasparro, K E (2019) Crowdfunding our cities: Three perspectives on stakeholder dynamics during innovative infrastructure delivery. PhD thesis, Stanford University, USA.
Gebremeskel, M N; Kim, S Y; Thuc, L D and Nguyen, M V (2021) Forming a driving index for implementing public-private partnership projects in emerging economy: Ethiopian perception. Engineering, Construction and Architectural Management, 28(10), pp. 2925-2947. ISSN 0969-9988
Geng, L; Herath, N; Hui, F K P; Liu, X; Duffield, C and Zhang, L (2023) Evaluating uncertainties to deliver enhanced service performance in education PPPs: A hierarchical reliability framework. Engineering, Construction and Architectural Management, 30(9), pp. 4464-4485. ISSN 0969-9988
Ghaffari, A (2013) Developing a mathematical model for profit sharing amongst partners in consulting engineering companies of construction projects. PhD thesis, Savitribai Phule Pune University, India, India.
Ghanbaripour, A N; Langston, C; Tumpa, R J and Skulmoski, G (2024) Validating and testing a project delivery success model in construction: A mixed-method approach in Australia. Smart and Sustainable Built Environment, 13(3), pp. 532-559. ISSN 2046-6099
Ghazali, F E M; Rashid, S A and Sadullah, A F M (2018) Disparity between the procurement process best practices for PPP projects in the UK and Malaysia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(6), pp. 264-270. ISSN 17514304
Ghorbany, S; Yousefi, S and Noorzai, E (2024) Evaluating and optimizing performance of public-private partnership projects using copula Bayesian network. Engineering, Construction and Architectural Management, 31(1), pp. 290-323. ISSN 0969-9988
Gidado, K and Smilas, M (2004) Development of a model for implementation of PFI/PPP in Cyprus. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Gil, N; Tommelein, I D; Kirkendall, R L and Ballard, G (2001) Leveraging specialty-contractor knowledge in design-build organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 355-367. ISSN 0969-9988
Gilmour, D; Blackwood, D; Falconer, R; Isaacs, J and Simpson, E (2015) The role of sustainability assessment in sustainability management for urban redevelopment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Gilmour, T; Wiesel, I; Pinnegar, S and Loosemore, M (2010) Social infrastructure partnerships: A firm rock in a storm? Journal of Financial Management of Property and Construction, 15(3), pp. 247-259. ISSN 1366-4387
Gilmour, Tony (2009) Network power: An international study of strengthening housing association capacity. PhD thesis, University of Sydney, Australia.
Giorgi, Serena (2020) Circular economy and regeneration of building stock: Policy improvements, strategic partnerships and life cycle decision-making tools. PhD thesis, Politecnico di Milano, Italy.
Girmscheid, G (2009) NPV model for evaluating the economic efficiency of municipal street maintenance by private providers. Journal of Construction Engineering and Management, 135(8), pp. 701-709. ISSN 0733-9364
Gjerde, M (2017) A change of scene: How the canterbury earthquake sequence led to a departure from concrete technologies. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Glagola, C R and Sheedy, W M (2002) Partnering on defense contracts. Journal of Construction Engineering and Management, 128(2), pp. 127-138. ISSN 0733-9364
Gomez, C; Castiblanco, D; Lozano, J M and Daza, C (2020) An exact optimization approach to the principal-agent problem in infrastructure projects via PPPs. International Journal of Construction Management, 20(6), pp. 679-689. ISSN 1562-3599
Gomez, C and Gambo, M (2016) Evaluation of special purpose vehicle organisation skill sets taxonomy for effective public-private partnership infrastructure project delivery. Journal of Construction in Developing Countries, 21(1), pp. 147-165. ISSN 1823-6499
Goncalves, Gustavo Henrique Vital (2022) Scenarios and support system for consortium management of construction waste applied to water resources management unit 12. PhD thesis, Universidade Federal de São Carlos, Brazil.
Gong, Z; Ejohwomu, O; Aminian, E and Abadi, M (2024) Risk analysis of building energy performance gap: Considering project complexity. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Gonzalez-Ruiz, J D; Arboleda, A; Botero, S and Rojo, J (2019) Investment valuation model for sustainable infrastructure systems: Mezzanine debt for water projects. Engineering, Construction and Architectural Management, 26(5), pp. 850-884. ISSN 0969-9988
Gosling, J; Naim, M; Towill, D; Abouarghoub, W and Moone, B (2015) Supplier development initiatives and their impact on the consistency of project performance. Construction Management and Economics, 33(5-6), pp. 390-403. ISSN 01446193
Gosling, J; Naim, M; Towill, D and Moone, B (2014) The impact of supplier development initiatives on key performance indicators. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Gottlieb, S C; Frederiksen, N; Koch, C and Thuesen, C (2018) Institutional logics and hybrid organizing in public-private partnerships. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Gottlieb, S C; Frederiksen, N; Koch, C and Thuesen, C (2020) Hybrid organisations as trading zones: Responses to institutional complexity in the shaping of strategic partnerships. Construction Management and Economics, 38(7), pp. 603-622. ISSN 01446193
Gottlieb, S C and Haugbølle, K (2013) Contradictions and collaboration: Partnering in-between systems of production, values and interests. Construction Management and Economics, 31(2), pp. 119-134. ISSN 1466433X
Gottlieb, S C and Storgaard, K (2006) Flexible strategic partnerships in Danish construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Gransberg, D D; Dillon, W D; Reynolds, L and Boyd, J (1999) Quantitative analysis of partnered project performance. Journal of Construction Engineering and Management, 125(3), pp. 161-166. ISSN 0733-9364
Green, S D (1999) Partnering: the propaganda of corporatism? Journal of Construction Procurement, 5(2), pp. 177-186. ISSN 1358-9180
Green, S D and May, S C (2003) Re-engineering construction: Going against the grain. Building Research & Information, 31(2), pp. 97-106. ISSN 0961-3218
Greenberg, D G (1978) Fixing things: A phenomenological study of ten persons. PhD thesis, Union Institute and University, USA.
Greenwood, D and Wu, S (2012) Establishing the association between collaborative working and construction project performance based on client and contractor perceptions. Construction Management and Economics, 30(4), pp. 299-308. ISSN 1466433X
Greenwood, D J (2001) Power and proximity: A study of subcontract formation in the UK building industry. PhD thesis, University of Reading, UK.
Greenwood, D J and Yates, D J (2006) The determinants of successful partnering: A transaction cost perspective. Journal of Construction Procurement, 12(1),
Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.
Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli. PhD thesis, University of Newcastle upon Tyne, UK.
Griffith, A (2011) Delivering best value in the small works portfolio of public sector organizations when using preferred contractors. Construction Management and Economics, 29(9), pp. 891-900. ISSN 1466433X
Grinnell, R C (2017) Recipes for low carbon, adaptable design. PhD thesis, Loughborough University, UK.
Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Grosse, H (2015) Trust and construction projects: An auto-ethnographic exploration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Gruneberg, S and Hughes, W P (2004) Construction consortia: Do they serve any real purpose? In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Gruneberg, S and Murdoch, I (2011) Specialist contractors' views: Testing the NSCC State of Trade Quarterly Report results against market conditions. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Guevara, J; Herrera, L and Salazar, J (2022) Interorganizational sponsor networks in road and social infrastructure PPP equity markets. Journal of Construction Engineering and Management, 148(4): 04022009, ISSN 0733-9364
Gultekin, P (2015) An integrated process model and decision support system for energy efficient retrofits. PhD thesis, Pennsylvania State University, USA.
Gunnigan, L (2007) Increasing effectiveness of public private partnerships in the Irish construction industry. PhD thesis, University of Salford, UK.
Guo, J and Kato, H (2024) Role of government equity investment in capital structure of project finance: Global evidence from PPP projects in developing countries. Journal of Construction Engineering and Management, 150(3): 04024003, ISSN 0733-9364
Guo, K; Zhang, L and Wang, T (2021) Concession period optimisation in complex projects under uncertainty: A public-private partnership perspective. Construction Management and Economics, 39(2), pp. 156-172. ISSN 01446193
Guo, Y; Liu, J; Chen, C; Luo, X and Martek, I (2024) PPP project price mode typologies: A China-based comparative case study. Engineering, Construction and Architectural Management, 31(5), pp. 2034-2052. ISSN 0969-9988
Guo, Y; Su, Y; Chen, C and Martek, I (2024) Inclusion of "managing flexibility" valuations in the pricing of PPP projects: A multi-objective decision-making method. Engineering, Construction and Architectural Management, 31(11), pp. 4562-4584. ISSN 0969-9988
Gupta, P K and Verma, H (2020) Risk perception in PPP infrastructure project financing in India. Journal of Financial Management of Property and Construction, 25(3), pp. 347-369. ISSN 1366-4387
Gupta, T; Kothari, C and Misra, S (2025) Integrating 'difficulty in management' as a decision-making criterion in the risk assessment of PPP infrastructure projects. Construction Management and Economics, 43(7), pp. 502-517. ISSN 0144-6193
Gusmao Brissi, S and Debs, L (2024) Principles for adopting offsite construction in design and construction companies focused on multifamily projects in the USA. Engineering, Construction and Architectural Management, 31(11), pp. 4308-4329. ISSN 0969-9988
Gustavsson, T K (2018) Liminal roles in construction project practice: Exploring change through the roles of partnering manager, building logistic specialist and BIM coordinator. Construction Management and Economics, 36(11), pp. 599-610. ISSN 01446193
Gutub, S (2019) Framework for the implementation process of public-private partnerships (P3s) in highway projects. PhD thesis, University of Washington, USA.
Göswein, V; Arehart, J; Phan-Huy, C; Pomponi, F and Habert, G (2022) Barriers and opportunities of fast-growing biobased material use in buildings. Buildings & Cities, 3(1), pp. 745-755. ISSN 2632-6655
Götz, C S; Karlsson, P and Yitmen, I (2022) Exploring applicability, interoperability and integrability of blockchain-based digital twins for asset life cycle management. Smart and Sustainable Built Environment, 11(3), pp. 532-558. ISSN 2046-6099
Habisreutinger, P and Gunderson, D E (2006) Real estate reuse opportunities within the regenesis project area: A case study. International Journal of Construction Education and Research, 2(1), pp. 53-63. ISSN 1557-8771
Haigh, R and Sutton, R (2012) Strategies for the effective engagement of multi-national construction enterprises in post-disaster building and infrastructure projects. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 270-282. ISSN 1759-5916
Haj Kazem Kashani, H (2012) A real options model for the financial valuation of infrastructure systems under uncertainty. PhD thesis, Georgia Institute of Technology, USA.
Hajjah Dayang Suzana, B H A A (2006) An exploration of the business environment of the construction industry of Negara Brunei Darussalam: in the context of public-private partnerships, privatisation and private finance initiatives. PhD thesis, University of Strathclyde, UK.
Halliday, J (1995) Use of the New Engineering Contract in Hong Kong. Engineering, Construction and Architectural Management, 2(4), pp. 307-315. ISSN 0969-9988
Hallowell, M R; Bhandari, S and Alruqi, W (2020) Methods of safety prediction: Analysis and integration of risk assessment, leading indicators, precursor analysis, and safety climate. Construction Management and Economics, 38(4), pp. 308-321. ISSN 01446193
Hampson, K and Kwok, T (1997) Strategic alliances in building construction: a tender evaluation tool for the public sector. Journal of Construction Procurement, 3(1), pp. 28-41. ISSN 1358-9180
Hampton, G; Baldwin, A N and Holt, G D (2012) Project delays and cost: Stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), pp. 73-91. ISSN 1366-4387
Hamza, A (2002) Partnering in the construction industry: an empirical investigation into the critical success factors. PhD thesis, Nottingham Trent University, UK.
Han, J and Huang, H (2023) Cooperative behavior, supervision, and contract choice in PPP projects: An evolutionary game theory approach incorporating an other-regarding preference. Journal of Construction Engineering and Management, 149(12): 04023140, ISSN 0733-9364
Haque, S M M (2004) Success factors in collaborative relationships (alliancing and partnering) in the UK upstream oil and gas industry, and perception of trust. PhD thesis, Robert Gordon University, UK.
Harajli, H A (2009) Cost-benefit analysis of microgenerators: An integrated appraisal perspective. PhD thesis, University of Bath, UK.
Haran, M; McCord, M; Hutchison, N; McGreal, S; Adair, A; Berry, J and Kashyap, A (2013) Financial structure of PPPs deals post-GFC: An international perspective. Journal of Financial Management of Property and Construction, 18(2), pp. 184-203. ISSN 1366-4387
Harper, C M; Molenaar, K R and Cannon, J P (2016) Measuring constructs of relational contracting in construction projects: The owner's perspective. Journal of Construction Engineering and Management, 142(10): 04016053, ISSN 0733-9364
Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364
Harper, G S (1997) Local government contract management: Decreasing cost overages in contracted out services. DPA thesis, University of La Verne, USA.
Harris Sr., C E (2023) Public private partnerships in infrastructure: A study on performance and equity improvement. DBA thesis, National University, USA.
Hassanein, A A G and Afify, H M F (2007) Risk management practices of contractors: A case study of power station projects in Egypt. Journal of Financial Management of Property and Construction, 12(3), pp. 164-179. ISSN 1366-4387
Hauck, A J; Walker, D H T; Hampson, K D and Peters, R J (2004) Project alliancing at national museum of Australia: collaborative process. Journal of Construction Engineering and Management, 130(1), pp. 143-152. ISSN 0733-9364
Haupt, T C and Smallwood, J (2003) HIV/AIDS in construction: Are older workers aware? Journal of Engineering, Design and Technology, 1(1), pp. 43-54. ISSN 1726-0531
He, W; Tang, W; Wei, Y; Duffield, C F and Lei, Z (2016) Evaluation of cooperation during project delivery: Empirical study on the hydropower industry in southwest China. Journal of Construction Engineering and Management, 142(2): 04015068, ISSN 0733-9364
He, Y; Shi, L and Li, Z (2021) The combined effect of marginal social and private benefit on the socially optimal equity structure of PPP projects. Construction Management and Economics, 39(10), pp. 807-823. ISSN 01446193
Hedborg, S and Gustavsson, T K (2019) Developing a neighbourhood: Horizontal interdependencies in an innovative multi-project context. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Heesom, D; Boden, P; Hatfield, A; De Los Santos Melo, A and Czarska-Chukwurah, F (2021) Implementing a HBIM approach to manage the translocation of heritage buildings. Engineering, Construction and Architectural Management, 28(10), pp. 2948-2966. ISSN 0969-9988
Heger, P; Bieber, C; Hendawy, M and Shooshtari, A (2025) Co-creating urban transformation: A stakeholder analysis for germany's heat transition. Buildings & Cities, 6(1), pp. 1046-1060. ISSN 2632-6655
Heidemann, A and Gehbauer, F (2011) The way towards cooperative project delivery. Journal of Financial Management of Property and Construction, 16(1), pp. 19-30. ISSN 1366-4387
Hellowell, M S (2012) Fair return for risk? An examination of structure, competition and profitability in the market for private finance in the National Health Service. PhD thesis, University of Edinburgh, UK.
Henjewele, C; Fewings, P and Pantaleo, D R (2013) De-marginalising the public in PPP projects through multi-stakeholders management. Journal of Financial Management of Property and Construction, 18(3), pp. 210-231. ISSN 1366-4387
Herbert, M (2000) Performance and the virtual team. PhD thesis, Loughborough University, UK.
Herbert, Y; Dale, A and Stashok, C (2022) Canadian cities: Climate change action and plans. Buildings & Cities, 3(1), pp. 854-873. ISSN 2632-6655
Herrera, R F; Mourgues, C; Alarcón, L F and Pellicer, E (2021) Analyzing the association between lean design management practices and BIM uses in the design of construction projects. Journal of Construction Engineering and Management, 147(4): 04021010, ISSN 0733-9364
Heurkens, E W T M (2012) Private sector-led urban development projects: Management, partnerships and effects in the Netherlands and the UK. PhD thesis, Delft University of Technology, Netherlands.
Hijazi, A A; Das, P; Li, Y; Moehler, R C and Maxwell, D W (2026) A contingency approach to platform implementation: Platform types, attributes, and value chain integration. Building Research & Information, 54(1), pp. 4-23. ISSN 0961-3218
Hill, C and Rodgers, J (2000) Project partnering arrangement for delivery of a tight scheduled project. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Hitt, S J; Hairstans, R; Oloke, D; Bertasso, S; Tamagnone, G and Shirley, B (2024) Developing modern construction professionals with a focus on timber – a UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 32-40. ISSN 17514304
Ho, S P (2006) Model for financial renegotiation in public-private partnership projects and its policy implications: Game theoretic view. Journal of Construction Engineering and Management, 132(7), pp. 678-688. ISSN 0733-9364
Hong, X and Proverbs, D (2003) Contractor relationships: A comparison in Japan, the UK and the US. Journal of Construction Procurement, 9(2), pp. 52-64. ISSN 1358-9180
Honsa, J; Versele, A; van de Kerckhove, T and Piccardo, C (2025) Circularity at the neighbourhood scale: Co-creative living lab lessons. Buildings & Cities, 6(1), pp. 800-818. ISSN 2632-6655
Hope, A (2011) Greener homes for the future?: sustainability in PFI local authority social housing. PhD thesis, Northumbria University, UK.
Horsley, A; France, C and Quatermass, B (2003) Delivering energy efficient buildings: A design procedure to demonstrate environmental and economic benefits. Construction Management and Economics, 21(4), pp. 345-356. ISSN 01446193
Hosseinian, Seyedmahdi (2013) Optimal outcome sharing arrangements in construction target contracts. PhD thesis, University of New South Wales, Australia.
Hou, W and Ran, W (2025) Unveiling the effects of influencing factors on PPP project capital structure in China using machine learning. Engineering, Construction and Architectural Management, 32(12), pp. 8621-8641. ISSN 0969-9988
Hou, Y and Wang, H (2026) Collusion prevention under different forms of performance-based subsidies during the operational period in PPP highway projects. Construction Management and Economics, 44(2), pp. 98-118. ISSN 0144-6193
Hou, W and Wang, L (2022) Research on the refinancing capital structure of highway PPP projects based on dynamic capital demand. Engineering, Construction and Architectural Management, 29(5), pp. 2047-2072. ISSN 0969-9988
Howard, M A (2022) Integration strategies for mergers and acquisitions in the United Kingdom housing sector. DBA thesis, Walden University, USA.
Howarth, T and Griffith, A (1998) Promoting continuous improvement in construction education: Developing curricula through graduate- practitioner reflection. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Hu, L and Wu, H (2016) Exploratory study on risk management of state-owned construction enterprises in China. Engineering, Construction and Architectural Management, 23(5), pp. 674-691. ISSN 0969-9988
Hu, Z; Chen, S and Zhang, X (2014) Value for money and its influential factors: An empirical study of PPP projects in Japan. Built Environment Project and Asset Management, 4(2), pp. 166-179. ISSN 2044-124X
Hu, Z; Li, Q; Liu, T; Wang, L and Cheng, Z (2021) Government equity investment, effective communication and public private partnership (PPP) performance: Evidence from China. Engineering, Construction and Architectural Management, 28(9), pp. 2811-2827. ISSN 0969-9988
Huang, K-S (2003) Development-related BOT: A lesson of under-utilized and over-utilized development synergy in Taiwan. DDes thesis, Harvard University, USA.
Huang, N; Du, Q; Zou, P X W and Huang, Y (2023) Analysis of key factors influencing green highway project development focusing on network interaction and project success: Evidence from China. Engineering, Construction and Architectural Management, 30(8), pp. 3203-3223. ISSN 0969-9988
Huang, Y-L (1995) Project and policy analysis of build-operate-transfer infrastructure development. PhD thesis, University of California, Berkeley, USA.
Hughes, D; Williams, T and Ren, Z (2012) Differing perspectives on collaboration in construction. Construction Innovation, 12(3), pp. 355-368. ISSN 1471-4175
Hunter, K and Kelly, J (2004) Value management workshops and partnering conundrums. Journal of Construction Procurement, 10(1),
Hymes, S J (2010) Front end specifications and the propagation of construction claims. DSc thesis, Washington University in St. Louis, USA.
Håkansson, H and Jahre, M (2005) Economic logics in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ibbotson, K (2020) Prioritising carbon reduction in UK public sector flood and coastal risk management. PhD thesis, University of Bolton, UK.
Ibem, E O (2010) An assessment of the role of government agencies in public-private partnerships in housing delivery in Nigeria. Journal of Construction in Developing Countries, 15(2), pp. 23-48. ISSN 1823-6499
Ibem, E O; Onyemaechi, P C and Ayo-Vaughan, E A (2018) Project selection and transparency factors in housing public-private partnerships in Nigeria. Construction Economics and Building, 18(2), pp. 15-40. ISSN 2204-9029
Ibrahim, A D (2007) The development of a procurement strategy for primary health care facilities in Nigeria. PhD thesis, Loughborough University, UK.
Ibrahim, A D; Price, A D F and Dainty, A R J (2006) The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria. Journal of Financial Management of Property and Construction, 11(3), pp. 149-164. ISSN 1366-4387
Ibrahim, A D; Price, A D F and Dainty, A R J (2006) An analysis of success factors for public private partnerships in infrastructure projects in Nigeria. Journal of Construction Procurement, 12(1),
Ibrahim, A D; Price, A D F and Dainty, A R J (2008) Is the local improvement finance trust (LIFT) procurement initiative delivering the expected economies of scale? Results from three case studies. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ibrahim, K I; Costello, S B; Wilkinson, S and Walker, D (2016) Project alliancing: The case of road infrastructure projects in New Zealand. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Imriyas, K; Low, S P; Teo, A L and Chan, S L (2008) Premium-rating model for workers' compensation insurance in construction. Journal of Construction Engineering and Management, 134(8), pp. 601-617. ISSN 0733-9364
Ingirige, B and Sexton, M (2006) Alliances in construction: Investigating initiatives and barriers for long-term collaboration. Engineering, Construction and Architectural Management, 13(5), pp. 521-535. ISSN 0969-9988
Ingirige, M J B (2004) A study of knowledge sharing in multinational construction alliances. PhD thesis, University of Salford, UK.
Inuwa, I I (2018) Unethical professional practices in tendering of public building procurement in Bauchi Metropolis, Nigeria. African Journal of Built Environment Research, 2(1), pp. 55-73. ISSN 2414-0236
Isa, C M M; Saman, H M; Preece, C N and Ibrahim, C K C (2016) Factors influencing Malaysian construction firm's entry mode decisions into international markets. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Isik, Z; Arditi, D; Dilmen, I and Talat Birgonul, M (2010) The role of exogenous factors in the strategic performance of construction companies. Engineering, Construction and Architectural Management, 17(2), pp. 119-134. ISSN 0969-9988
Ismaeel, W S E (2019) Systems thinking and modeling for buildings' sustainable site selection. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Ismail, S and Haris, F A (2014) Constraints in implementing public private partnership (PPP) in Malaysia. Built Environment Project and Asset Management, 4(3), pp. 238-250. ISSN 2044-124X
Iyer, K C and Sagheer, M (2010) Hierarchical structuring of PPP risks using interpretative structural modeling. Journal of Construction Engineering and Management, 136(2), pp. 151-159. ISSN 0733-9364
Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X
Iyer-Raniga, U and Wingrove, D (2012) Curriculum innovation in transnational teaching: A pilot study. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Jackson, J I (2009) Collaboration in planning sustainable developments. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 69-74. ISSN 17514312
Jacob, D; Kochendörfer, B; Von Drygalski, M and Hilbig, C (2014) Ten years of PPP in Germany: Experiences and perspectives. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), pp. 180-188. ISSN 17514304
Jacobsson, M and Roth, P (2014) Towards a shift in mindset: Partnering projects as engagement platforms. Construction Management and Economics, 32(5), pp. 419-432. ISSN 01446193
Jadidoleslami, S. and Saghatforoush, E. (2026) Interdependencies unveiled: MICMAC analysis of BIM-AI synergies in construction. Journal of Construction Engineering and Management, 152(7): 04026086, ISSN 0733-9364
Jafari Ramiani, A; Sarvari, H; Chan, D W M; Nassereddine, H and Lotfata, A (2024) Critical success factors for private sector participation in accomplishing abandoned public sports facilities projects in Iran. International Journal of Construction Management, 24(6), pp. 586-600. ISSN 1562-3599
Jambol, D D; Molwus, J J and Daniel, M M (2013) Re-thinking the approaches to mass housing delivery in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.
Jang, W; Yu, G; Jung, W; Kim, D and Han, S H (2018) Financial conflict resolution for public-private partnership projects using a three-phase game framework. Journal of Construction Engineering and Management, 144(3): 05017022, ISSN 0733-9364
Jaraskumjonkul, T (2020) A digital prototype for collaborative conceptual design in the Thai AEC sector. PhD thesis, University of Salford, UK.
Jaselskis, E J; Kurtenbach, J M and Forrest, J (2002) Enhancing financial success among electrical contractors. Journal of Construction Engineering and Management, 128(1), pp. 65-75. ISSN 0733-9364
Javanmardi, A (2019) Strategies and predictive models for reducing workflow variability in construction production systems. PhD thesis, North Carolina State University, USA.
Javed, A A; Lam, P T I and Chan, A P C (2014) Change negotiation in public-private partnership projects through output specifications: An experimental approach based on game theory. Construction Management and Economics, 32(4), pp. 323-348. ISSN 01446193
Jayamaha, B H V H; Perera, B A K S; Gimhani, K D M and Rodrigo, M N N (2024) Adaptability of enterprise resource planning (ERP) systems for cost management of building construction projects in Sri Lanka. Construction Innovation, 24(5), pp. 1255-1279. ISSN 1471-4175
Jayarathna, H S N M; Perera, B A K S; Atapattu, D and Rodrigo, N (2025) Circular economy and blockchain-integrated road map to improve construction waste management. Construction Innovation, 25(7), pp. 23-49. ISSN 1471-4175
Jayasena, N S; Chan, D W M and Kumaraswamy, M (2024) Benefits, enablers and barriers in deploying PPP when developing smart infrastructure in non-urban areas. Built Environment Project and Asset Management, 14(1), pp. 92-108. ISSN 2044-124X
Jayasena, N S; Chan, D W M; Kumaraswamy, M M and Saka, A B (2023) Applicability of public-private partnerships in smart infrastructure development: The case of Hong Kong. International Journal of Construction Management, 23(11), pp. 1932-1944. ISSN 1562-3599
Jayasuriya, Sajani (2018) A systematic stakeholder management framework for managing public private partnership projects in Australia. PhD thesis, RMIT University, Australia.
Jefferies, M (2006) Critical success factors of public private sector partnerships: A case study of the sydney superdome. Engineering, Construction and Architectural Management, 13(5), pp. 451-462. ISSN 0969-9988
Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988
Jefferies, M and Chen, S E (2004) Identifying risk factors of boot procurement: A case study of stadium Australia. Construction Economics and Building, 4(1), pp. 11-20. ISSN 2204-9029
Jefferies, M; Gameson, R O D and Rowlinson, S (2002) Critical success factors of the BOOT procurement system: Reflections from the stadium Australia case study. Engineering, Construction and Architectural Management, 9(4), pp. 352-361. ISSN 0969-9988
Jefferies M, G T B G (2013) Public private partnerships: The provision of healthcare infrastructure in Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Jennings, Iain C (1997) Systemic integration in construction project organisations. PhD thesis, University of Melbourne, Australia.
Jiang, W.; Jiang, J.; Martek, I. and Jiang, W. (2025) Critical risk management strategies for the operation of public–private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988
Jiang, F; Lyu, Y; Zhang, Y and Guo, Y (2023) Research on the differences between risk-factor attention and risk losses in PPP projects. Journal of Construction Engineering and Management, 149(9): 04023090, ISSN 0733-9364
Jiang, W; Jiang, J; Martek, I and Jiang, W (2025) Critical risk management strategies for the operation of public-private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988
Jiang, W; Jiang, J; Martek, I and Jiang, W (2025) Critical risk management strategies for the operation of public-private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988
Jiang, X; Wang, S; Liu, Y; Xia, B; Skitmore, M; Nepal, M and Ghanbaripour, A N (2023) A method for the ontology-based risk management of PPP construction projects. Construction Innovation, 23(5), pp. 1095-1129. ISSN 1471-4175
Jimoh, I (2021) What explains the efficiency of major public project delivery in Nigeria? PhD thesis, University of Cambridge, UK.
Jin, H; Chan, M and Bai, Y (2025) Joint optimization of critical concession parameters for sustainable PPP contracts. Journal of Construction Engineering and Management, 151(6): 04025051, ISSN 0733-9364
Jin, H; Liu, S; Li, J and Liu, C (2020) A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs. International Journal of Construction Management, 20(6), pp. 642-652. ISSN 1562-3599
Jin, H; Liu, S; Li, J and Liu, C (2023) Determination of government guarantee and revenue cap in public-private partnership contracts. Engineering, Construction and Architectural Management, 30(2), pp. 393-414. ISSN 0969-9988
Jin, H; Liu, S; Liu, C and Udawatta, N (2019) Optimizing the concession period of PPP projects for fair allocation of financial risk. Engineering, Construction and Architectural Management, 26(10), pp. 2347-2363. ISSN 0969-9988
Jin, X H (2010) Determinants of efficient risk allocation in privately financed public infrastructure projects in Australia. Journal of Construction Engineering and Management, 136(2), pp. 138-150. ISSN 0733-9364
Jin, X H (2011) Model for efficient risk allocation in privately financed public infrastructure projects using neuro-fuzzy techniques. Journal of Construction Engineering and Management, 137(11), pp. 1003-1014. ISSN 0733-9364
Jin, X H and Doloi, H (2008) Interpreting risk allocation mechanism in public-private partnership projects: An empirical study in a transaction cost economics perspective. Construction Management and Economics, 26(7), pp. 707-721. ISSN 1466433X
Jin, X H; Zhang, G and Yang, R J (2012) Factor analysis of partners' commitment to risk management in public-private partnership projects. Construction Innovation, 12(3), pp. 297-316. ISSN 1471-4175
Jin, X H and Zuo, J (2011) Critical uncertainty factors for efficient risk allocation in privately financed public infrastructure projects in Australia. International Journal of Construction Management, 11(3), pp. 19-34. ISSN 1562-3599
Jin, X-H (2009) Allocating risks in public-private partnerships using a transaction cost economic approach: A case study. Construction Economics and Building, 9(1), pp. 19-26. ISSN 2204-9029
Jintamanaskoon, S and Chan, P W (2014) Boundary making in public-private-partnerships (PPP): A historical account of the British railway industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
John, G A; Clements-Croome, D J; Fairey, V and Loy, H M (2005) Contextual prerequisites for the application of ILS principles to the building services industry. Engineering, Construction and Architectural Management, 12(4), pp. 307-328. ISSN 0969-9988
Johnson, T R; Feng, P; Sitzabee, W and Jernigan, M (2013) Federal acquisition regulation applied to alliancing contract practices. Journal of Construction Engineering and Management, 139(5), pp. 480-487. ISSN 0733-9364
Jones, K and Kaluarachchi, Y (2007) Operational factors affecting strategic partnering in UK social housing. Engineering, Construction and Architectural Management, 14(4), pp. 334-345. ISSN 0969-9988
Jooste, S F (2010) Exploring the networks of organizations that enable and govern infrastructure public-private partnerships: An organizational field-level perspective. PhD thesis, Stanford University, USA.
Jordan, M R C (2005) The design, use and implementation of maintenance management systems and pavement management systems for whole life costing. Unpublished PhD thesis, Curtin University of Technology, Australia.
Juan, C and Olmos, F (2019) Public-private equity joint ventures and risk transfers in motorways of the sea. Built Environment Project and Asset Management, 9(5), pp. 669-682. ISSN 2044-124X
Kadefors, A (2005) Trust in construction: Cognitive traps as obstacles to collaborative contracting strategies. Journal of Construction Procurement, 11(2),
Kalantari, S; Shepley, M M; Rybkowski, Z K and Bryant, J (2017) Designing for operational efficiency: Facility managers' perspectives on how their knowledge can be better incorporated during design. Architectural Engineering and Design Management, 13(6), pp. 457-478. ISSN 1745-2007
Kalowski, J (2008) Community consultation: Lessons from Sydney. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 65-69. ISSN 17514312
Kaluarachchi, Y and Jones, K (2004) Improving the delivery of social housing in UK- using the Amphion initiative as a case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kaluarachchi, Y D and Jones, K (2007) Monitoring of a strategic partnering process: The Amphion experience. Construction Management and Economics, 25(10), pp. 1053-1061. ISSN 1466433X
Kamali, S (2025) Conceptual framework to evaluate and enhance resilience of public-private partnership projects. PhD thesis, Middle East Technical University, Turkey.
Kamar, K A M (2011) Critical success factors to industrialised building system (IBS) contractor. PhD thesis, University of Salford, UK.
Kamat, K J (2003) Decision making and negotiation: Establishing social order on a construction site. PhD thesis, University of Birmingham, UK.
Kamel, M; Khallaf, R and Nosaier, I (2023) Net present value-time curve behaviour of public private partnership projects. International Journal of Construction Management, 23(11), pp. 1924-1931. ISSN 1562-3599
Kaminsky, J A (2018) National culture shapes private investment in transportation infrastructure projects around the globe. Journal of Construction Engineering and Management, 144(2): 04017098, ISSN 0733-9364
Kaminsky, J A (2022) Improving public-private partnerships for renewable electricity infrastructure in lower- and middle-income countries. Journal of Construction Engineering and Management, 148(5): 04022012, ISSN 0733-9364
Kangari, R and Miyatake, Y (1997) Developing and managing innovative construction technologies in Japan. Journal of Construction Engineering and Management, 123(1), pp. 72-84. ISSN 0733-9364
Kapambwe, F C (2003) An evaluation of the implications of equity foreign direct investment risks in BOT infrastructure projects for overseas contractors in sub-Saharan Africa. PhD thesis, University of Reading, UK.
Karnasuta, P (2004) An examination of the effects of web-based virtual working environments on team effectiveness within construction projects. PhD thesis, University of Reading, UK.
Karrbom Gustavsson, T (2016) Liminality roles in construction project practice: Opportunities and challenges. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Karvekar, S P (2008) Private sector participation in roads development: Planning and management issues. PhD thesis, Maharaja Sayajirao University of Baroda, India.
Karvonen, A (2013) Towards systemic domestic retrofit: A social practices approach. Building Research & Information, 41(5), pp. 563-574. ISSN 0961-3218
Kashiwagi, D T; Halmrast, C T and Tisthammer, T (1996) Intelligent procurement of construction systems. Journal of Construction Procurement, 2(1), pp. 56-65. ISSN 1358-9180
Kaushik, A (2019) Gating and syntactical analysis of spatial configuration of sectors of Gurgaon (Gurugram), India. Journal of Construction in Developing Countries, 23(2), pp. 87-106. ISSN 1823-6499
Kavishe, N and Chileshe, N (2017) Joint venture housing projects in dar es salaam city: An analysis of challenges and effectiveness. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kavishe, N and Chileshe, N (2018) Motivational factors for adoption of public-private partnerships (PPPs) in housing projects in Tanzania: A qualitative study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Kavishe, N and Chileshe, N (2019) Readiness assessment of public-private partnerships implementation within Tanzanian housing projects: Challenges, strategies and approaches. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Kavishe, N and Chileshe, N (2020) Driving forces for adopting public-private partnerships in Tanzanian housing projects. International Journal of Construction Management, 20(8), pp. 912-927. ISSN 1562-3599
Kavishe, N and Chileshe, N (2022) Development and validation of public-private partnerships framework for delivering housing projects in developing countries: A case of Tanzania. International Journal of Construction Management, 22(5), pp. 873-890. ISSN 1562-3599
Kavishe, N; Chileshe, N and Jefferson, I (2019) Public-private partnerships in Tanzanian affordable housing schemes: Policy and regulatory issues, pitfalls and solutions. Built Environment Project and Asset Management, 9(2), pp. 233-247. ISSN 2044-124X
Kavishe, N; Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects: The case of Tanzania. Engineering, Construction and Architectural Management, 25(2), pp. 202-240. ISSN 0969-9988
Kavishe, N; Jefferson, I and Chileshe, N (2019) Evaluating issues and outcomes associated with public-private partnership housing project delivery: Tanzanian practitioners' preliminary observations. International Journal of Construction Management, 19(4), pp. 354-369. ISSN 1562-3599
Kavishe, N W (2018) Improving the delivery of PPP housing projects in developing countries. PhD thesis, University of Birmingham, UK.
Kavuri, A S; Soetanto, R; Goodier, C; Murguia, D and Szczygiel, M (2020) Scenarios for the digitalisation of the construction industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Kayaga, S (2008) Public-private delivery of urban water services in Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 147-155. ISSN 17514312
Ke, Y (2014) Is public-private partnership a panacea for infrastructure development? The case of Beijing national stadium. International Journal of Construction Management, 14(2), pp. 90-100. ISSN 1562-3599
Ke, Y; Cheng, Z; Zhang, J and Liu, Y (2024) Making sense of the definition of public-private partnerships. Built Environment Project and Asset Management, 14(1), pp. 4-21. ISSN 2044-124X
Ke, Y; Hao, W; Ding, H and Wang, Y (2017) Factors influencing the private involvement in urban rail public-private partnership projects in China. Construction Economics and Building, 17(1), pp. 90-106. ISSN 2204-9029
Ke, Y; Wang, S; Chan, A P C and Cheung, E (2009) Research trend of public-private partnership in construction journals. Journal of Construction Engineering and Management, 135(10), pp. 1076-1086. ISSN 0733-9364
Ke, Y; Wang, S; Chan, A P C and Cheung, E (2011) Understanding the risks in China's PPP projects: Ranking of their probability and consequence. Engineering, Construction and Architectural Management, 18(5), pp. 481-496. ISSN 0969-9988
Ke, Y; Zhao, X; Wang, Y and Wang, S (2009) SWOT analysis of domestic private enterprises in developing infrastructure projects in China. Journal of Financial Management of Property and Construction, 14(2), pp. 152-170. ISSN 1366-4387
Keath, M (1983) The development of school construction systems in Hertfordshire 1946-64. PhD thesis, University of Greenwich, UK.
Kedir, F; Hall, D M; Brantvall, S; Lessing, J; Hollberg, A and Soman, R K (2024) Circular information flows in industrialized housing construction: The case of a multi-family housing product platform in Sweden. Construction Innovation, 24(5), pp. 1354-1379. ISSN 1471-4175
Kedir, F N (2022) The performance and potential of industrialized construction for resource-efficient housing construction: A multi-scalar approach across product, system, and context. DSc thesis, ETH Zürich, Switzerland.
Kelly, J and Hunter, K (2002) Using value management techniques to set up partnering agreements. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Khalfan, M; McDermott, P and Cooper, R (2004) Integrating the supply chain within construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Khalfan, M M A and McDermott, P (2006) Once unthought, now the best practice within the construction sector. Journal of Construction Procurement, 12(1),
Khalifa, M; Farrell, P and Emam, H (2015) The concept of partnering in public–private partnership projects in the United Arab Emirates. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 277-284. ISSN 17514304
Khallaf, R (2016) Interactional risks associated with parties to a PPP project. PhD thesis, Purdue University, USA.
Khamaksorn, A (2019) Knowledge transfer processes in international construction joint venture projects in Thailand. PhD thesis, Oxford Brookes University, UK.
Khamaksorn, A; Tah, J H M and Kurul, E (2022) Social networks and knowledge transfer in international construction joint venture projects: A case study in Thailand. Journal of Construction in Developing Countries, 27(1), pp. 111-137. ISSN 1823-6499
Khan, S (2017) Using the last planner system and lean principles to improve workflow in BIM-based building design projects. PhD thesis, University of Huddersfield, UK.
Khazaeni, G and Khazaeni, A (2026) Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm. International Journal of Building Pathology and Adaptation, 44(1), pp. 208-222. ISSN 2398-4708
Khoza, R B M (2021) Performance measurements on concession periods to forecast water infrastructure investment returns. PhD thesis, Walden University, USA.
Khurana, M; Garvin, M J and Mahalingam, A (2022) Synthesis of relational practices for PPP contracts and their linkage with governance mechanisms. Journal of Construction Engineering and Management, 148(12): 04022131, ISSN 0733-9364
Khurana, Mayank (2021) Investigation of contractual specification and implementation of relational approaches in public private partnership (PPP) projects. PhD thesis, Virginia Tech, USA.
Kibert, C J and Fard, M M (2012) Differentiating among low-energy, low-carbon and net-zero-energy building strategies for policy formulation. Building Research & Information, 40(5), pp. 625-637. ISSN 0961-3218
Kifokeris, D (2021) Variants of Swedish lean construction practices reported in research: Systematic literature review and critical analysis. Journal of Construction Engineering and Management, 147(7), ISSN 0733-9364
Kifokeris, D and Koch, C (2020) Swedish lean construction practices identified in the last decade of research. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Kifokeris, D and Tezel, A (2025) Blockchain and lean construction: An exploration of bidirectional synergies and interactions. Architectural Engineering and Design Management, 21(1), pp. 171-189. ISSN 1745-2007
Kinawy, S N (2017) Customizing information delivery for citizens in transportation infrastructure projects: Towards active community participation in decision-making. PhD thesis, University of Toronto, Canada.
Kivrak, S; Ross, A; Arslan, G and Tuncan, M (2009) Impacts of cultural d1 fferences on project success 1 n construct1 on. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Kivrak, S; Ross, A; Arslan, G and Tuncan, M (2010) Construction professionals' perspectives on cross-cultural training for international construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Kiziltas, S; Dikmen, I and Birgonul, M T (2003) Organizational effectiveness in construction: A conceptual framework. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Koch, C (2004) Can knowledge management become global? Consulting engineering companies in the knowledge economy. Journal of Construction Research, 5(1), pp. 107-124. ISSN 1609-9451
Koch, C and Buser, M (2003) Innovating mature public private partnerships: Danish municipalities and construction firms in networked public services. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Koch, C and Buser, M (2015) Sitting between two chairs: Introducing social sustainability in three large Swedish contractor companies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Koch, C and Gottlieb, S (2003) Consulting engineering under Europeanization: Denmark-based professional service firms in turbulence. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Koch, C and Haugen, T I (2004) An it R&D-programme without new code?! State driven it development in Denmark. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Koch, C and Larsen, C S (2006) Quality in construction: A supply chain perspective. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kohler, N and Hassler, U (2002) The building stock as a research object. Building Research & Information, 30(4), pp. 226-236. ISSN 0961-3218
Koirala, M P; Thapa, N; Giri, O P and Sha, R K (2025) Evaluation of variation orders on road construction projects in rural Nepal. Construction Economics and Building, 25(3-4), pp. 311-338. ISSN 2204-9029
Kometa, S T (1995) An evaluation of client-generated risks in construction consultancies. PhD thesis, University of Wolverhampton, UK.
Kong, Z; Ma, H; Lv, K and Shi, J J (2023) Liability of foreignness in public-private partnership projects. Journal of Construction Engineering and Management, 149(9): 04023085, ISSN 0733-9364
Konukcu, S (2011) A knowledge chain framework for construction supply chains. PhD thesis, Loughborough University, UK.
Koolwijk, J; van Oel, C and Bel, M (2022) The interplay between financial rules, trust and power in strategic partnerships in the construction industry. Engineering, Construction and Architectural Management, 29(3), pp. 1089-1108. ISSN 0969-9988
Koolwijk, J; van Oel, C; Vrijhoef, R and Wamelink, J W F (2015) Partnering in construction: A field study to further develop the framework of supply chain integration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Koolwijk, J S J (2022) Rules, power and trust: Interplay between inter-organizational structures and interpersonal relationships in project-based organizations in the construction industry. PhD thesis, Delft University of Technology, Netherlands.
Koops, L S W (2017) Creating public value: Optimizing cooperation between public and private partners in infrastructure projects. PhD thesis, Delft University of Technology, Netherlands.
Koraltan, S B and Dikbas, A (2002) An assessment of the applicability of partnering in the Turkish construction sector. Construction Management and Economics, 20(4), pp. 315-321. ISSN 01446193
Koseoglu, O; Sakin, M and Arayici, Y (2018) Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project. Engineering, Construction and Architectural Management, 25(10), pp. 1339-1354. ISSN 0969-9988
Koskela, L (2003) Is structural change the primary solution to the problems of construction? Building Research & Information, 31(2), pp. 85-96. ISSN 0961-3218
Koukkari, H (2010) Transformation of a research centre toward an innovation partner in the construction sector. Engineering, Construction and Architectural Management, 17(1), pp. 89-98. ISSN 0969-9988
Krainer, Christiane Wagner Mainardes (2021) Model of social capital accumulation in civil construction companies. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.
Krystallis, I (2016) A study of the concept of future-proofing in healthcare building asset management and the role of BIM in its delivery. PhD thesis, Loughborough University, UK.
Krystallis, I; Demian, P and Price, A D F (2015) Using BIM to integrate and achieve holistic future-proofing objectives in healthcare projects. Construction Management and Economics, 33(11-12), pp. 890-906. ISSN 01446193
Ku, S; Jo, H; Sim, J and Moon, W S (2024) Competitive performance of public–private partnerships: unsolicited proposal projects and tendering rules in South Korea. Construction Management and Economics, 42(8), pp. 714-740. ISSN 01446193
Kukah, A S K; Owusu-Manu, D G; Badu, E and Asamoah, E (2024) Structural equation model (SEM) for evaluating interrelationships among risks inherent in Ghanaian public-private partnership (PPP) power projects. Engineering, Construction and Architectural Management, 31(6), pp. 2327-2352. ISSN 0969-9988
Kukah, A S K; Owusu-Manu, D G; Badu, E and Edwards, D J (2024) Reasons for entering into Ghanaian public-private partnership (PPP) power projects. Journal of Engineering, Design and Technology, 22(3), pp. 854-878. ISSN 1726-0531
Kukah, A S K; Owusu-Manu, D G; Badu, E; Edwards, D J and Asamoah, E (2024) Fuzzy quantitative risk allocation model (fqram) to guide decision-making on risk allocation in Ghanaian public-private partnership (PPP) power projects. Journal of Financial Management of Property and Construction, 29(1), pp. 83-114. ISSN 1366-4387
Kulasekara, L B; Perera, B A K S and Perera, H A H P (2025) Impact of smart city system on the construction industry in Sri Lanka. Journal of Engineering, Design and Technology, 23(2), pp. 546-568. ISSN 1726-0531
Kululanga, G K; Kuotcha, W; McCaffer, R and Edum-Fotwe, F (2001) Construction contractors' claim process framework. Journal of Construction Engineering and Management, 127(4), pp. 309-314. ISSN 0733-9364
Kumaraswamy, M M (1997) Productivity matters. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Kumaraswamy, M M; Ling, F Y Y; Anvuur, A M and Rahman, M M (2007) Targeting relationally integrated teams for sustainable PPPs. Engineering, Construction and Architectural Management, 14(6), pp. 581-596. ISSN 0969-9988
Kumaraswamy, M M; Ling, F Y Y; Rahman, M M and Phng, S T (2005) Constructing relationally integrated teams. Journal of Construction Engineering and Management, 131(10), pp. 1076-1086. ISSN 0733-9364
Kumaraswamy, M M and Morris, D A (2002) Build-operate-transfer-type procurement in Asian megaprojects. Journal of Construction Engineering and Management, 128(2), pp. 93-102. ISSN 0733-9364
Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects. PhD thesis, Heriot-Watt University, UK.
Kurniawan, F; Ogunlana, S and Motawa, I (2014) Stakeholders' expectations in utilising financial models for public-private partnership projects. Built Environment Project and Asset Management, 4(1), pp. 4-21. ISSN 2044-124X
Kuru, K and Artan, D (2020) A canvas model for risk assessment and performance estimation in public-private partnerships. International Journal of Construction Management, 20(6), pp. 704-719. ISSN 1562-3599
Kusljic, D and Marenjak, S (2012) Evaluating political aspects of success for PPP/PFI sports hall in Croatia. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Kwan, A Y and Ofori, G (2001) Chinese culture and successful implementation of partnering in Singapore's construction industry. Construction Management and Economics, 19(6), pp. 619-632. ISSN 01446193
Kwawu, W and Hughes, W P (2005) The impact of relational contracting on the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kwawu, W and Laryea, S (2014) Governance structures in collaborative working practices. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Kwofie, T E; Ohis Aigbavboa, C and Thwala, W D (2019) Communication performance challenges in PPP projects: Cases of Ghana and South Africa. Built Environment Project and Asset Management, 9(5), pp. 628-641. ISSN 2044-124X
Kwok, T L (1998) Strategic alliances in construction: A study of contracting relationships and competitive advantage in public sector building works. PhD thesis, Queensland University of Technology, Australia.
La, Anh Tuan (2016) Principal factors for public-private partnership (ppp) implementation in Vietnam: A mixed methods study. PhD thesis, University of Technology Sydney, Australia.
Laborde, M and Sanvido, V (1994) Introducing new process technologies into construction companies. Journal of Construction Engineering and Management, 120(3), pp. 488-508. ISSN 0733-9364
Ladzani, M W (2009) Evaluation of small and medium-sized enterprises' performance in the built environment. DPhil thesis, University of Johannesburg, South Africa.
Lahdenperä, P (2012) Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(1), pp. 57-79. ISSN 1466433X
Lahdenperä, P (2012) How to proportion capability and fee percentage for team comparison in competitive early involvement. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Laishram, B S and Kalidindi, S N (2009) Desirability rating analysis for debt financing of public-private partnership road projects. Construction Management and Economics, 27(9), pp. 823-837. ISSN 1466433X
Lam, T and Gale, K (2014) Highway maintenance: Impact of framework agreements upon project financial performance. Construction Management and Economics, 32(5), pp. 460-472. ISSN 01446193
Langford, D A; Abukhder, J; Murray, M; Hardcastle, C and Vernea, E (2004) Rethinking construction: What about the SMEs? Journal of Construction Procurement, 10(1),
Lau, C H; Mesthrige, J W; Lam, P T I and Javed, A A (2019) The challenges of adopting new engineering contract: A Hong Kong study. Engineering, Construction and Architectural Management, 26(10), pp. 2389-2409. ISSN 0969-9988
Lau, E and Rowlinson, S (2005) The value base of trust for the construction industry. Journal of Construction Procurement, 11(1),
Lau, E and Rowlinson, S (2009) Interpersonal trust and inter-firm trust in construction projects. Construction Management and Economics, 27(6), pp. 539-554. ISSN 1466433X
Lau, H-l (2005) Trust relations in the construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Lavikka, R; Seppänen, O; Peltokorpi, A and Lehtovaara, J (2020) Fostering process innovations in construction through industry–university consortium. Construction Innovation, 20(4), pp. 569-586. ISSN 1471-4175
Lazo, A G; Çidik, M S; Addyman, S and Rillie, I (2024) Perspectives on project management and asset management integration: A systematic review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Le, P L; Elmughrabi, W; Dao, T M and Chaabane, A (2020) Present focuses and future directions of decision-making in construction supply chain management: A systematic review. International Journal of Construction Management, 20(5), pp. 490-509. ISSN 1562-3599
Le, P L; Jarroudi, I; Dao, T M and Chaabane, A (2021) Integrated construction supply chain: An optimal decision-making model with third-party logistics partnership. Construction Management and Economics, 39(2), pp. 133-155. ISSN 01446193
Le, P T; Chileshe, N; Kirytopoulos, K and Rameezdeen, R (2020) Investigating the significance of risks in BOT transportation projects in Vietnam. Engineering, Construction and Architectural Management, 27(6), pp. 1401-1425. ISSN 0969-9988
Le, P T; Chileshe, N; Kirytopoulos, K and Rameezdeen, R (2020) Exploring the underlying relationship among risks in BOT transportation projects in developing countries: The case of Vietnam. Journal of Financial Management of Property and Construction, 26(1), pp. 103-125. ISSN 1366-4387
Le Masurier, J W (2001) Developing the observational method as a systematic approach to uncertainty management. PhD thesis, University of Bristol, UK.
Lee, H S; Seo, J O; Park, M; Ryu, H G and Kwon, S S (2009) Transaction-cost-based selection of appropriate general contractor-subcontractor relationship type. Journal of Construction Engineering and Management, 135(11), pp. 1232-1240. ISSN 0733-9364
Lee, N; Lee, L W and Kovel, J (2016) An experimental study of instructional pedagogies to teach math-related content knowledge in construction management education. International Journal of Construction Education and Research, 12(4), pp. 255-269. ISSN 1557-8771
Lehtiranta, L and Junnonen, J M (2014) Stretching risk management standards: Multi-organizational perspectives. Built Environment Project and Asset Management, 4(2), pp. 128-145. ISSN 2044-124X
Lehtonen, T J T (2006) Partnering relations: Justification and success factors from facilities management services perspective. DScTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Leiringer, R (2001) Developing an effective model to support construction companies entering the public-private partnership projects' market. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Leiringer, R (2003) Technological innovations in the context of public-private partnership projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Leiringer, R (2006) Technological innovation in PPPs: Incentives, opportunities and actions. Construction Management and Economics, 24(3), pp. 301-308. ISSN 01446193
Leung, M Y; Chong, A; Ng, S T and Cheung, M C K (2004) Demystifying stakeholders' commitment and its impacts on construction projects. Construction Management and Economics, 22(7), pp. 701-715. ISSN 01446193
Li, B (2003) Risk management of construction public private partnership projects. PhD thesis, Glasgow Caledonian University, UK.
Li, B; Akintoye, A; Edwards, P and Hardcastle, C (2004) Risk treatment preferences for PPP/PFI construction projects in the UK. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2005) Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(5), pp. 459-471. ISSN 01446193
Li, B; Akintoye, A and Hardcastle, C (2000) Conceptual framework for construction public private partnerships. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Li, C; Zhao, Y and Chen, W F (2024) Effects of commitment-based governance on the relationship between formal control and PPP projects performance: Mediating and moderating. Engineering, Construction and Architectural Management, 31(2), pp. 696-715. ISSN 0969-9988
Li, H; Cheng, E W L and Love, P E D (2000) Partnering research in construction. Engineering, Construction and Architectural Management, 7(1), pp. 76-92. ISSN 0969-9988
Li, H; Li, W; Wang, L and Lv, L (2021) Public satisfaction evaluation of urban water environment treatment public-private partnership project: A case study from China. International Journal of Building Pathology and Adaptation, 39(2), pp. 407-432. ISSN 23984708
Li, H; Lv, L; Zuo, J; Su, L; Wang, L and Yuan, C (2020) Dynamic reputation incentive mechanism for urban water environment treatment PPP projects. Journal of Construction Engineering and Management, 146(8): 0001879, ISSN 0733-9364
Li, H; Xia, Q; Wang, L and Ma, Y (2020) Sustainability assessment of urban water environment treatment public-private partnership projects using fuzzy logic. Journal of Engineering, Design and Technology, 18(5), pp. 1251-1267. ISSN 1726-0531
Li, H; Xu, C; Cao, Y and Zhang, C (2024) What are the influencing factors of government's trust decision-making on private sector in PPP projects: Evidence from China? Journal of Engineering, Design and Technology, 22(3), pp. 813-835. ISSN 1726-0531
Li, Q (2012) Inter-organizational relationships in the programme management lifecycle. PhD thesis, University of Leeds, UK.
Li, S (1998) An investigation of the build operate transfer approach for infrastucture works in the People's Republic of China. PhD thesis, University of Reading, UK.
Li, S and Ling, F Y Y (2012) Critical strategies for Chinese architectural, engineering and construction firms to achieve profitability. Engineering, Construction and Architectural Management, 19(5), pp. 495-511. ISSN 0969-9988
Li, X; Liu, Y; Wilkinson, S and Liu, T (2019) Driving forces influencing the uptake of sustainable housing in New Zealand. Engineering, Construction and Architectural Management, 26(1), pp. 46-65. ISSN 0969-9988
Li, X; Yuan, J; Liu, X; Wang, G and Wang, Q C (2024) The effects of joint-contract functions on PPP project value creation: A mediation model. Engineering, Construction and Architectural Management, 31(10), pp. 4162-4183. ISSN 0969-9988
Li, Y; He, N; Zhang, Y; Li, H and Zhang, C (2023) Optimization of capital structure for urban water PPP projects using mezzanine financing: Sustainable perspective. Journal of Construction Engineering and Management, 149(8): 04023059, ISSN 0733-9364
Li, Y; Wang, X and Wang, Y (2017) Using bargaining game theory for risk allocation of public-private partnership projects: Insights from different alternating offer sequences of participants. Journal of Construction Engineering and Management, 143(3): 04016102, ISSN 0733-9364
Li, Y C; Luk, W H and Cheng, E (2016) Hong Kong's first public sector NEC contract: Lessons learnt. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 231-237. ISSN 17514304
Li, Z; Zhang, Q; Fan, F and Shen, S (2020) Analysis of dynamic properties and vibration comfort of large-scale stands. Building Research & Information, 48(7), pp. 802-816. ISSN 0961-3218
Liang, Y and Ashuri, B (2022) Challenges and enabling features of small and medium infrastructure public-private partnerships (p3s): A case study of the US P3 infrastructure market. Engineering, Construction and Architectural Management, 29(1), pp. 49-71. ISSN 0969-9988
Liaros, S (2022) A network of circular economy villages: Design guidelines for 21st century garden cities. Built Environment Project and Asset Management, 12(3), pp. 349-364. ISSN 2044-124X
Liguori, D; Sommerville, J and Manase, D (2012) Housing association preferred form of partnering. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Liguori, D; Sommerville, J and Manase, D (2012) Probabilistic pre-requisites contributing to successful housing association partnering. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Lima, Luanda Regina Reis (2022) A systematic approach for developing sustainability guidelines for stakeholders in public project management. PhD thesis, Universidade Federal de Pernambuco, Brazil.
Lindblad, H and Karrbom Gustavsson, T (2017) Receptiveness for change: The case of a public client. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Ling, F Y Y; Kumaraswamy, M M; Dulaimi, M F and Khalfan, M (2011) Public private partnerships: Overcoming pre-contract problems faced by public clients and private providers in infrastructure projects in Singapore. International Journal of Construction Management, 11(1), pp. 63-77. ISSN 1562-3599
Liou, F M; Yang, C H; Chen, B and Chen, W (2011) Identifying the Pareto-front approximation for negotiations of BOT contracts with a multi-objective genetic algorithm. Construction Management and Economics, 29(5), pp. 535-548. ISSN 1466433X
Liston, K M (2009) A mediated interaction approach to study the role of media use in team interaction. PhD thesis, Stanford University, USA.
Liu, A M M and Fellows, R (2001) An eastern perspective on partnering. Engineering, Construction and Architectural Management, 8(1), pp. 1-19. ISSN 0969-9988
Liu, B; Li, J; Wang, D; Liu, H; Wu, G and Yuan, J (2024) Public-private partnerships: A collaborative framework for ensuring project sustainable operations. Engineering, Construction and Architectural Management, 31(1), pp. 264-289. ISSN 0969-9988
Liu, J (2024) Value co-creation for public–private partnership (PPP) projects in China: A holistic framework from antecedents to outcomes of interaction. PhD thesis, University of Technology Sydney, Australia.
Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X
Liu, J; Gao, R; Cheah, C Y J and Luo, J (2017) Evolutionary game of investors' opportunistic behaviour during the operational period in PPP projects. Construction Management and Economics, 35(3), pp. 137-153. ISSN 01446193
Liu, J; Guo, Y; Martek, I; Chen, C and Tian, J (2022) A phase-oriented evaluation framework for China's PPP projects. Engineering, Construction and Architectural Management, 29(9), pp. 3737-3753. ISSN 0969-9988
Liu, J and Liu, J (2024) The demand hierarchy of the government and investors in PPP projects. Engineering, Construction and Architectural Management, 31(4), pp. 1539-1555. ISSN 0969-9988
Liu, J; Liu, J and Bu, Z (2022) Effects of different face-saving concerns on the escalation of commitment between state-owned and private investors in PPP projects. Journal of Construction Engineering and Management, 148(9): 04022092, ISSN 0733-9364
Liu, J; Love, P E D; Smith, J; Regan, M and Palaneeswaran, E (2015) Review of performance measurement: Implications for public-private partnerships. Built Environment Project and Asset Management, 5(1), pp. 35-51. ISSN 2044-124X
Liu, Q (2025) The impact of funnel sales management on sales performance in engineering construction companies: An empirical study based on CE company data. DBA thesis, Arizona State University, USA.
Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Investment apportionments among participants of PPP rental retirement villages. Built Environment Project and Asset Management, 10(1), pp. 64-77. ISSN 2044-124X
Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(1), pp. 128-149. ISSN 0969-9988
Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2022) Development and testing of a rent determination framework for PPP rental villages. International Journal of Construction Management, 22(2), pp. 192-204. ISSN 1562-3599
Liu, T; Bennon, M; Garvin, M J and Wang, S (2017) Sharing the big risk: Assessment framework for revenue risk sharing mechanisms in transportation public-private partnerships. Journal of Construction Engineering and Management, 143(12): 04017086, ISSN 0733-9364
Liu, T; Mostafa, S; Sherif, M and Tuan Son, N (2021) Emerging themes of public-private partnership application in developing smart city projects: A conceptual framework. Built Environment Project and Asset Management, 11(1), pp. 138-156. ISSN 2044-124X
Liu, T and Wilkinson, S (2011) Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation, 11(4), pp. 452-469. ISSN 1471-4175
Liu, T and Wilkinson, S (2013) Can the pilot public-private partnerships project be applied in future urban rail development? A case study of Beijing Metro Line 4 project. Built Environment Project and Asset Management, 3(2), pp. 250-263. ISSN 2044-124X
Liu, T and Wilkinson, S (2014) Using public-private partnerships for the building and management of school assets and services. Engineering, Construction and Architectural Management, 21(2), pp. 206-223. ISSN 0969-9988
Liu, W; Chan, A P C; Chan, M W; Darko, A and Oppong, G D (2025) Key performance indicators for hospital planning and construction: A systematic review and meta-analysis. Engineering, Construction and Architectural Management, 32(5), pp. 3375-3406. ISSN 0969-9988
Liu, Xiaoyan (2023) The effects of public-private partnership on innovation and project performance. PhD thesis, University of Sydney, Australia.
Liu, Y; Wang, X; Guo, S; Shi, X and Wang, D (2024) Analyzing the optimization of subsidies for PPP urban rail transit projects: A choice between passenger demand, vehicle kilometer, or an improved efficiency-oriented framework. Journal of Construction Engineering and Management, 150(1): 04023142, ISSN 0733-9364
Liu, Y; Wang, X; Zhang, J and Guo, S (2025) How risk factors lead to the early termination of public–private partnership projects in China: A multi-case study based on social network analysis and interpretive-structure modeling. Engineering, Construction and Architectural Management, 32(2), pp. 824-846. ISSN 0969-9988
Liu, Z; Wang, H and Li, H (2018) Model of equipment sharing between contractors on construction projects. Journal of Construction Engineering and Management, 144(6): 04018039, ISSN 0733-9364
Liyanage, C; Dias, N; Amaratunga, D and Haigh, R (2017) Current context of transport sector in south Asia: Recommendations towards a sustainable transportation system. Built Environment Project and Asset Management, 7(5), pp. 490-505. ISSN 2044-124X
Lo Prete, Matteo (2013) Synergies between management and valorization of cultural heritage through models based on BIM technologies. PhD thesis, Politecnico di Milano, Italy.
Locicero, Ryan Charles Robert (2015) Mainstreaming green infrastructure: The nexus of infrastructure and education using the green space based learning (gsbl) approach for bioretention plant selection. PhD thesis, University of South Florida, USA.
Lombardi Filho, Pedro (2022) Management of small volumes of asbestos-cement materials in Brazil: From use to waste. PhD thesis, Universidade de São Paulo, Brazil.
London, K; Kenley, R and Agapiou, A (1998) Theoretical supply chain network modelling in the building industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Lonsdale, J and Lucas, C (2019) The influence of key performance indicators on relationship and performance of joint venture construction projects in the UK. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Loosemore, M (2015) Barriers to social enterprise in the UK construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Loosemore, M and Barraket, J (2017) The co-creation of social value between social enterprises and private firms in the construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Loosemore, M; Denny-Smith, G; Barraket, J; Keast, R; Chamberlain, D; Muir, K; Powell, A; Higgon, D and Osborne, J (2021) Optimising social procurement policy outcomes through cross-sector collaboration in the Australian construction industry. Engineering, Construction and Architectural Management, 28(7), pp. 1908-1928. ISSN 0969-9988
Loosemore, M; Keast, R and Barraket, J (2023) How are social procurement actors shaping a new field of professional practice in the Australian construction industry? Engineering, Construction and Architectural Management, 30(9), pp. 4192-4209. ISSN 0969-9988
Loosemore, M; Osborne, J and Higgon, D (2021) Affective, cognitive, behavioural and situational outcomes of social procurement: A case study of social value creation in a major facilities management firm. Construction Management and Economics, 39(3), pp. 227-244. ISSN 01446193
Lopes, Manoela Gomes Reis (2016) Formative approach to accident prevention in the building construction process. PhD thesis, Universidade de São Paulo, Brazil.
Loraine, R K (1994) Project specific partnering. Engineering, Construction and Architectural Management, 1(1), pp. 5-16. ISSN 0969-9988
Love, P E D; Irani, Z; Cheng, E and Li, H (2002) A model for supporting inter-organizational relations in the supply chain. Engineering, Construction and Architectural Management, 9(1), pp. 2-15. ISSN 0969-9988
Love, P E D; Mistry, D and Davis, P R (2010) Price competitive alliance projects: Identification of success factors for public clients. Journal of Construction Engineering and Management, 136(9), pp. 947-956. ISSN 0733-9364
Love, P E D; Tse, R Y C; Holt, G D and Proverbs, D G (2002) Transaction costs, learning, and alliances. Journal of Construction Research, 3(2), pp. 193-207. ISSN 1609-9451
Low, W W; Abdul-Rahman, H and Zakaria, N (2020) Organisational culture of Malaysian international construction organisations. International Journal of Construction Management, 20(2), pp. 105-121. ISSN 1562-3599
Lowe, D J and Leiringer, R (2005) Commercial management in project-based organisations. Journal of Financial Management of Property and Construction, 10(1), pp. 3-18. ISSN 1366-4387
Lowe, J G (2010) Edinburgh trams: A case study of a complex project. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Lowe, R (2007) Technical options and strategies for decarbonizing UK housing. Building Research & Information, 35(4), pp. 412-425. ISSN 0961-3218
Lu, W; Ye, K; Flanagan, R and Jewell, C (2014) Nexus between contracting and construction professional service businesses: Empirical evidence from international market. Journal of Construction Engineering and Management, 140(2): 04013049, ISSN 0733-9364
Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.
Lu, Z; Liu, J and Bu, Z (2025) Influencing factors of the government's willingness to compensate in the early termination of PPP projects: Based on multiple cases in China. Construction Management and Economics, 43(10), pp. 823-848. ISSN 0144-6193
Luise Valencia Gluyas, J (2004) Public-private participation in water infrastructure in Mexico. PhD thesis, University of Leeds, UK.
Lumpkin, D (2022) Reimagining building efficacy: An exploratory study. PhD thesis, Purdue University, USA.
Luo, Z; Jiang, Y; Li, X; Wu, R and Pan, H (2026) Financing mode selection and key success factors in area comprehensive development projects based on if-multimoora. Journal of Construction Engineering and Management, 152(4): 04026032, ISSN 0733-9364
Lv, J; Lin, M; Zhou, W and Xu, M (2021) How PPP renegotiation behaviors evolve with traffic changes: Evolutionary game approach. Journal of Construction Engineering and Management, 147(5): 04021032, ISSN 0733-9364
Lyu, K Y (1989) Internationalisation of Korean industry: A study of the performance of the plant and construction industry. PhD thesis, University of Manchester, UK.
Löfgren, P and Eriksson, P E (2009) Effects of collaboration in projects on construction project performance. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Lühr, G J; Bosch-Rekveldt, M and Radujković, M (2023) The last-planner-system's impact on project culture. Journal of Engineering, Design and Technology, 21(5), pp. 1303-1322. ISSN 1726-0531
Lützkendorf, T and Lorenz, D (2005) Sustainable property investment: Valuing sustainable buildings through property performance assessment. Building Research & Information, 33(3), pp. 212-234. ISSN 0961-3218
Ma, H; Zeng, S; Lin, H and Zeng, R (2020) Impact of public sector on sustainability of public-private partnership projects. Journal of Construction Engineering and Management, 146(2): 04019104, ISSN 0733-9364
Ma, Q; Li, S and Cheung, S O (2022) Unveiling embedded risks in integrated project delivery. Journal of Construction Engineering and Management, 148(1): 04021180, ISSN 0733-9364
Mabuza, P V (2016) The potential role of public-private partnerships in the South African economy: An innovative conceptual public-private partnerships model for small and medium enterprise development. DLittPhil thesis, University of South Africa, South Africa.
Madanayake, U (2021) Digitalisation to improve organisational competitive advantage: a study on BBI exploitation. PhD thesis, London South Bank University, UK.
Madziva, T J (2018) The effect of partnering, infrastructure gaps and currency weakness on the cost of an infrastructure-building nonmarket strategy in emerging markets. PhD thesis, University of Pretoria, South Africa.
Mahalingam, A (2010) PPP experiences in Indian cities: Barriers, enablers, and the way forward. Journal of Construction Engineering and Management, 136(4), pp. 419-429. ISSN 0733-9364
Mahama, Habib (2000) The role of financial and non-financial information in the constitution and stabilisation of collaborative supply relationships. PhD thesis, University of New South Wales, Australia.
Mahboubi Niazmandi, M; Moussavi, P; Ahmadi Bonakdar, Z; Shakiba, A; Sedaeesoula, R; Mohammadzade Esfahani Nezhad, S and Oke, A E (2025) Synergistic effects of building information modelling and lean construction: A conceptual model for enhancing productivity in construction projects. International Journal of Construction Management, 25(13), pp. 1552-1569. ISSN 1562-3599
Mahdi, H S and Carmichael, D G (2014) Optimal sharing arrangement for multiple project outcomes. Journal of Financial Management of Property and Construction, 19(3), pp. 264-280. ISSN 1366-4387
Mahmood, A and Abrishami, S (2020) BIM for lean building surveying services. Construction Innovation, 20(3), pp. 447-470. ISSN 1471-4175
Mahmud, Bello Zailani (2025) Equity-driven workforce development initiatives through long-term strategic partnerships for the construction and maintenance of green stormwater infrastructure. DEng thesis, Morgan State University (Maryland), USA.
Maisarah, F; Abduh, M; Wirahadikusumah, R and Cakravastia, A (2025) Development of the conceptual business model of a third-party logistics provider for Indonesian small contractors. International Journal of Construction Management, 25(2), pp. 194-203. ISSN 1562-3599
Maiwada, Y B (2003) Private financing of infrastructure projects in Sub-Sahara Africa: a case study of Nigerian water infrastructure project. PhD thesis, University of Manchester, UK.
Maiwada, Yusuf Bashir (2003) Private financing of infrastructure projects in sub Sahara Africa: A case study of Nigerian water infrastructure project. PhD thesis, University of Manchester, UK.
Makwiranzou, C (2019) Building trust and managing risk between the client, consultant, and contractor in traditional and relational construction projects. PhD thesis, University of Liverpool, UK.
Malaeb, Z and Hamzeh, F R (2022) IPD-inspired framework for measuring stakeholder integration in public-private partnerships. Construction Innovation, 22(1), pp. 160-184. ISSN 1471-4175
Malek, M S and Bhatt, V (2023) Examine the comparison of CSFs for public and private sector's stakeholders: A SEM approach towards PPP in Indian road sector. International Journal of Construction Management, 23(13), pp. 2239-2248. ISSN 1562-3599
Malek, M S and Gundaliya, P J (2023) Negative factors in implementing public-private partnership in Indian road projects. International Journal of Construction Management, 23(2), pp. 234-242. ISSN 1562-3599
Mallisetti, V; Dolla, T and Laishram, B (2022) Unpacking the framework of unsolicited proposal for public private partnership projects: the Indian case. Journal of Financial Management of Property and Construction, 27(2), pp. 179-198. ISSN 1366-4387
Mandujano Rodríguez, M G (2016) A method to identify virtual design and construction implementation strategies from a lean construction perspective. DEng thesis, Pontificia Universidad Catolica de Chile, Chile.
Mangano, G; Castelblanco, G; De Marco, A and Ottaviani, F M (2025) Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), pp. 193-210. ISSN 2044-124X
Mangu, S; Thillai Rajan, A and Deep, A (2021) Comparison of toll and annuity PPPs: A case study of highway projects in India. Built Environment Project and Asset Management, 11(1), pp. 103-120. ISSN 2044-124X
Manley, K; McFallan, S and Kajewski, S (2009) Relationship between construction firm strategies and innovation outcomes. Journal of Construction Engineering and Management, 135(8), pp. 764-771. ISSN 0733-9364
Mansell, P R (2021) Measuring infrastructure projects sustainable development goals impact (MISI). PhD thesis, London South Bank University, UK.
Maqsood, T and Akintoye, A (2002) Supply chain management: More than a new name for management of relationships. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Marciano, E J (2003) Sustainable development and the cement and concrete industries. PhD thesis, Universite de Sherbrooke, Canada.
Marguet, N; Ross, A and Johnson, D (2009) Developing supply chain procurement systems in social housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Marinelli, M (2019) Evaluation of PPP road projects in Greece. Built Environment Project and Asset Management, 9(2), pp. 186-198. ISSN 2044-124X
Marique, Y (2013) Cooperation and competition in complex construction projects: Implementation of EU procurement rules in England and Belgium. International Journal of Law in the Built Environment, 5(1), pp. 53-70. ISSN 17561469
Marques, R C and Berg, S (2011) Risks, contracts, and private-sector participation in infrastructure. Journal of Construction Engineering and Management, 137(11), pp. 925-932. ISSN 0733-9364
Martin, H; Watson, C and Brooks, T (2025) Synergizing BIM and riba in architectural practice-technology workflow efficiencies, challenges, and insights. Architectural Engineering and Design Management, 21(1), pp. 35-59. ISSN 1745-2007
Martin, J C; Akande, K and Falconer, R A (2010) Innovations from the Halcrow-Cardiff university strategic collaboration. Engineering, Construction and Architectural Management, 17(1), pp. 46-64. ISSN 0969-9988
Marx, H (2010) Employers' and agents' perspectives of the condition of the construction industry in South Africa. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Mason, J R (2007) The views and experiences of specialist contractors on partnering in the UK. Construction Management and Economics, 25(5), pp. 519-527. ISSN 1466433X
Mathur, V N; Price, A D F and Austin, S (2008) Conceptualizing stakeholder engagement in the context of sustainability and its assessment. Construction Management and Economics, 26(6), pp. 601-609. ISSN 1466433X
Matsane, Z S-s (2023) An integrated SCM model for collaborative working in construction in South Africa. PhD thesis, University of Johannesburg, South Africa.
Matshidze, L B (2021) Developing a Public Private Partnerships (PPP) framework for implementing road maintenance projects in South African rural communities. PhD thesis, Heriot-Watt University, UK.
Matthews, J and Rowlinson, S (1999) Partnering: Incorporating safety management. Engineering, Construction and Architectural Management, 6(4), pp. 347-357. ISSN 0969-9988
Matthews, J; Tyler, A and Thorpe, A (1996) Pre-construction project partnering: Developing the process. Engineering, Construction and Architectural Management, 3(1-2), pp. 117-131. ISSN 0969-9988
Matthews, J D (1996) A project partnering approach to the main contractor - sub contractor relationship. PhD thesis, Loughborough University, UK.
Mazher, K M; Chan, A P C; Zahoor, H; Khan, M I and Ameyaw, E E (2018) Fuzzy integral-based risk-assessment approach for public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 144(12): 04018111, ISSN 0733-9364
McAdam, B (2010) Building information modelling: the UK legal context. International Journal of Law in the Built Environment, 2(3), pp. 246-259. ISSN 1756-1450
McDermott, P; Khalfan, M and Swan, W (2005) Trust in construction projects. Journal of Financial Management of Property and Construction, 10(1), pp. 19-32. ISSN 1366-4387
McElroy, L B (2009) Embedding integrated building performance assessment in design practice. PhD thesis, University of Strathclyde, UK.
McErlane, A; Haran, M; McClements, S and McCord, J (2018) Modelling the drivers for public-private partnerships (PPP) provision of United Kingdom (UK) social infrastructure. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
McErlane, A; Heaney, G; Haran, M and McClements, S (2016) The application of stakeholder theory to UK PPP stakeholders. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
McLarnon, C; Spillane, J P; Bradley, J; McCartan, N and Nelson, M (2020) Open innovation within loughview timber: How knowledge transfer is opening doors to new markets. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
McNamara, E T (1997) The current perspective of major United Kingdom construction companies on the private finance initiative. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Md Lasa, Y; Ahmad, N and Takim, R (2015) Critical success factors in obtaining project financing for private finance initiative projects in Malaysia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Mecca, S (1999) A model of construction planning procedure according to contingency theory. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Medimagh, S and Triki, A (2019) The PPP performance based on the co-creation with customers. Built Environment Project and Asset Management, 9(5), pp. 642-654. ISSN 2044-124X
Meduri, S S and Annamalai, T R (2013) Unit costs of public and PPP road projects: Evidence from India. Journal of Construction Engineering and Management, 139(1), pp. 35-43. ISSN 0733-9364
Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.
Mello, Simone Gueresi de (2023) Urban transformation in pieces: Financing, regulation, and implementation tricks of social interest housing in the consortium urban operations of the city of São Paulo. PhD thesis, Universidade de São Paulo, Brazil.
Men, Y (2023) Investigation into sustainable solutions for improving small and medium sized museums in China. PhD thesis, De Montfort University, UK.
Menches, C L and Abraham, D M (2007) Women in construction-tapping the untapped resource to meet future demands. Journal of Construction Engineering and Management, 133(9), pp. 701-707. ISSN 0733-9364
Meng X, H F (2013) The application of whole life costing in PFI/PPP projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Menzies, J L and Orr, S C (2014) Internationalization to China: A model for Australian architectural, engineering and construction firms. International Journal of Construction Education and Research, 10(3), pp. 201-221. ISSN 1557-8771
Merna, T (2004) Assessing methods to analyse portfolios of projects and their risks procured by project finance. PhD thesis, University of Manchester, UK.
Mestizo Reyes, Rubén D (2018) Political risk and success factors in public-private partnerships at the subnational level: The case of road infrastructure concessions. DBA thesis, Pontificia Universidad Catolica del Peru, Peru.
Meyer, M A; Hendricks, M; Newman, G D; Masterson, J H; Cooper, J T; Sansom, G; Gharaibeh, N; Horney, J; Berke, P; van Zandt, S and Cousins, T (2018) Participatory action research: Tools for disaster resilience education. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 402-419. ISSN 1759-5916
Miao, J.; Shen, G. Q.; Fan, H. and Wang, G. (2026) Governing cross-regional collaborative innovation in construction: Evolutionary game insights from complex adaptive systems. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988
Mihara, H; Kurokawa, M; Hughes, W P and Hojo, T (2014) The comparison of construction management curricula in universities between the UK and Japan. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Mihov, M (2020) Making it fit: The role of institutional work in the transplantation of the anglo-saxon public-private partnership model to Germany. PhD thesis, King's College London, UK.
Miller, C; Packham, G and Thomas, B (2003) Inter-organisational relationships and their effect upon small construction enterprises in South Wales: Co-operation at a cost. Journal of Construction Procurement, 9(2), pp. 17-28. ISSN 1358-9180
Miller, C J M; Packham, G A and Williams, T (1999) Re-defining sub-contracting: Reducing transaction costs? In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Millett, S J; Dainty, A R J; Briscoe, G H and Neale, R H (2000) Towards an integrated construction supply network: Sub-contractors perspectives. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Mills, Anthony John (2002) Client and contractor attitudes to prequalification and selection processes for construction work. PhD thesis, University of Melbourne, Australia.
Mirzadeh, I and Birgisson, B (2016) Evaluation of highway projects under government support mechanisms based on an option-pricing framework. Journal of Construction Engineering and Management, 142(4): 04015094, ISSN 0733-9364
Mirzaee, A M; Pourrostam, T; Majrouhi Sardroud, J; Hosseini, M R; Rahnamayiezekavat, P and Edwards, D (2024) Dispute root causes and prevention in Iranian public-private partnership projects: A causal-predictive model. Engineering, Construction and Architectural Management, 31(1), pp. 405-431. ISSN 0969-9988
Mladenovic, G; Vajdic, N; Wündsch, B and Temeljotov-Salaj, A (2013) Use of key performance indicators for PPP transport projects to meet stakeholders' performance objectives. Built Environment Project and Asset Management, 3(2), pp. 228-249. ISSN 2044-124X
Mlecnik, E (2014) Which factors determine the success of strategic niche developments? Reflections from the emergence of a passive house network. Construction Innovation, 14(1), pp. 36-51. ISSN 1471-4175
Mofokeng, M; Alhassan, A L and Zeka, B (2024) Public-private partnerships and economic growth: A sectoral analysis from developing countries. International Journal of Construction Management, 24(10), pp. 1029-1037. ISSN 1562-3599
Mohagheghi-Fard, M N (2019) An online collaboration framework for small and medium sized enterprises in the United Kingdom construction sector. PhD thesis, University of Salford, UK.
Mohamad Kamar, K A (2011) Critical success factors to industrialised building system contractor. PhD thesis, University of Salford, UK.
Mohamed, S (2003) Performance in international construction joint ventures: Modeling perspective. Journal of Construction Engineering and Management, 129(6), pp. 619-626. ISSN 0733-9364
Mohandes, S. R.; Singh, A. K.; Ibrahim, A.; Ma, N.; Kineber, A. F. and Shakor, P. (2026) Pioneering digital transformation: Unveiling the blockchain and digital twin technologies' synergy. Journal of Engineering, Design and Technology, 24(4), pp. 1076-1100. ISSN 1726-0531
Molad, C B (1996) Mobilizing an industry towards change: The construction industry's effort to introduce electronic commerce for the twenty-first century and beyond. PhD thesis, Union Institute, USA.
Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180
Moore, J D and Plugge, P W (2008) Perceptions and expectations: Implications for construction management internships. International Journal of Construction Education and Research, 4(2), pp. 82-96. ISSN 1557-8771
Moradi, S and Kähkönen, K (2022) Success in collaborative construction through the lens of project delivery elements. Built Environment Project and Asset Management, 12(6), pp. 973-991. ISSN 2044-124X
Moragane, H P M N L B; Perera, B A K S; Palihakkara, A D and Ekanayake, B (2024) Application of computer vision for construction progress monitoring: A qualitative investigation. Construction Innovation, 24(2), pp. 446-469. ISSN 1471-4175
Mosaner, Fabio Ferreira Lins (2021) Design and process in architectural production: João filgueiras lima (lelé) and the centro de tecnologia da rede sarah (ctrs). PhD thesis, Universidade de São Paulo, Brazil.
Moshood, T D; Ling, Y V; Chai, C and Lee, C K (2025) Intention to engage in inter-contractor cooperation: A belief elicitation study in the construction industry. Engineering, Construction and Architectural Management, 32(12), pp. 8592-8620. ISSN 0969-9988
Mousa, K; Zhang, Z and Sumarliah, E (2024) Mitigation strategies of public-private partnership (PPP) barriers in Palestinian construction projects. Engineering, Construction and Architectural Management, 31(8), pp. 3124-3147. ISSN 0969-9988
Moyanga, Dorcas Titilayo; Ojo, Lekan Damilola and Ogunsemi, Deji Rufus (2026) Prioritizing strategies for surviving economic turbulence: Case of quantity surveying consultancy organizations in Nigeria. Journal of Construction Business and Management, 8(2), pp. 15-27. ISSN 2521-0165
Moylan, W A (2005) Building ethics in construction partnerships: An analysis of values-based leadership. PhD thesis, Capella University, USA.
Mugabi, J and Marin, P (2008) PPP in urban water: Lessons from Yerevan, Armenia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 171-178. ISSN 17514312
Muhammad, Z and Johar, F (2019) Critical success factors of public-private partnership projects: A comparative analysis of the housing sector between Malaysia and Nigeria. International Journal of Construction Management, 19(3), pp. 257-269. ISSN 1562-3599
Mulowayi, E; Coffey, V; Bunker, J and Trigunarsiah, B (2015) The influence of critical infrastructure interdependencies on post-disaster reconstruction: Elements of infrastructure interdependency that impede the post-disaster recovery effort. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Mulu, T and Smith, N J (2008) Innovative road infrastructure financing in Jamaica and the developing countries. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Mundonde, J (2022) Framework model for financing sustainable water and sanitation infrastructure in Zimbabwe. PhD thesis, University of South Africa, South Africa.
Murphy, M (2016) Exploration of the synergies between activity theory and the dmaic method in evaluating construction processes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Murray, M. (2024) Civil engineering employers' engagement in work-integrated learning. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 58-70. ISSN 1751-4304
Murray, M and Langford, D (2009) Collegiality in the Scottish construction industry: Are Jock Tamson's bairns held together by surface tension? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Murray, M D and Langford, D A (1998) Construction procurement systems: A linkage with project organizational models. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Musenero, L; Baroudi, B and Gunawan, I (2021) Application of dual concern theory in elucidating conflict behavior in infrastructure public-private partnership projects. Journal of Construction Engineering and Management, 147(7): 04021061, ISSN 0733-9364
Musenero, L; Baroudi, B and Gunawan, I (2023) Critical issues affecting dispute resolution practice in infrastructure public-private partnerships. Journal of Construction Engineering and Management, 149(3): 04023001, ISSN 0733-9364
Musenero, Leah (2023) Development of an integrated framework for constructive dispute resolution in infrastructure public-private partnership projects. PhD thesis, University of Adelaide, Australia.
Musonda, I and Gambo, N (2021) Mediation effect of partnership on procurement strategy factors influencing sustainable smart housing development, Nigeria. Built Environment Project and Asset Management, 11(3), pp. 454-467. ISSN 2044-124X
Mustaffa, N E and Bowles, G (2004) Dispute avoidance mechanism in partnering arrangements. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Mustaffa, N E and Bowles, G (2005) Investigating the "hard" and "soft" issues of problem resolution in partnering: Defining the research boundaries. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Muzorewa, Maxwell (2024) Project management strategies used in hospitality construction projects to improve performance. DBA thesis, Walden University, USA.
Mwakabole, G C; Gurmu, A T and Tivendale, L (2019) Investigation of the challenges facing public-private partnership projects in Australia. Construction Economics and Building, 19(1), pp. 57-74. ISSN 2204-9029
Mwesigwa, R; Nabwami, R; Mayengo, J and Basulira, G (2020) Contractual completeness as a cornerstone to stakeholder management in public private partnership projects in Uganda. Built Environment Project and Asset Management, 10(3), pp. 469-484. ISSN 2044-124X
Myers, H; Wade, F and Webb, J (2019) Mapping emerging subcontracting networks for the energy efficiency retrofit of hard-to-treat buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Myint, K. Z. and Hadikusumo, B. H. W. (2026) Key factors influencing governance in transport infrastructure public-private partnership projects in Myanmar: Case study approach. International Journal of Construction Management, 26(10), pp. 2258-2278. ISSN 1562-3599
Nabil, A (2016) P.A.L.M. - physical asset lifecycle modelling in the healthcare sector. PhD thesis, University College London, UK.
Naderpajouh, N and Hastak, M (2014) Quantitative analysis of policies for governance of emergent dynamics in complex construction projects. Construction Management and Economics, 32(12), pp. 1222-1237. ISSN 01446193
Nagogo, U B (2022) A strategy for stakeholder engagement in public private partnership urban infrastructure provision in Nigeria. PhD thesis, University of Salford, UK.
Naimi, M (2013) Contract and claim prevention in major projects: a study on petrochemical projects in Iran. PhD thesis, University of Manchester, UK.
Naismith, N; Price, A D F; Dainty, A R J; Bryman, A; Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(2),
Naji Almassi, A (2011) Credit value adjusted real options based valuation of multiple-exercise government guarantees for infrastructure projects. PhD thesis, University of Toronto, Canada.
Nam, C H and Tatum, C B (1992) Noncontractual methods of integration on construction projects. Journal of Construction Engineering and Management, 118(2), pp. 385-398. ISSN 0733-9364
Narbaev, T; De Marco, A and Orazalin, N (2020) A multi-disciplinary meta-review of the public-private partnerships research. Construction Management and Economics, 38(2), pp. 109-125. ISSN 01446193
Nasri, E; Pegels, G; Mostofinejad, D and Chini, A (2010) International transfer of CAD/CAM construction technologies: Case study of a German-Iranian partnership. International Journal of Construction Management, 10(2), pp. 71-92. ISSN 1562-3599
Naylor, G; Raidén, A B and Morgan, A (2009) Constructing apprenticeships; transforming through sharing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Nayyer, M I and Annamalai, T R (2024) Procuring authorities and project performance: A case study of PPP highway projects in India. Built Environment Project and Asset Management, 14(1), pp. 38-55. ISSN 2044-124X
Ndlela, W H Z (2022) Dynamic challenges facing SME consulting firms in the built environment sector in Kwazulu-Natal province: The entrepreneurial approach. DBA thesis, University of Liverpool, UK.
Ndoni, D and Elhag, T M S (2012) Improving project performance of PPP/PFI project-based organisations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Newcombe, R (1999) Procurement as a learning process. Journal of Construction Procurement, 5(2), pp. 211-220. ISSN 1358-9180
Newton, L A (2004) The impact of quality on building life cycle costs. PhD thesis, University of New Brunswick, Canada.
Ng, K F (2017) Sustainable housing and railway developments over space and time. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Ng, S T and Wong, Y M W (2006) Adopting non-privately funded public-private partnerships in maintenance projects: A case study in Hong Kong. Engineering, Construction and Architectural Management, 13(2), pp. 186-200. ISSN 0969-9988
Ng, S T and Wong, Y M W (2007) Payment and audit mechanisms for non private-funded PPP-based infrastructure maintenance projects. Construction Management and Economics, 25(9), pp. 915-923. ISSN 1466433X
Ng, S T and Xie, J (2008) A simulation model for evaluating the tariff stability of concession-based PPP proposals. Construction Innovation, 8(2), pp. 106-119. ISSN 1471-4175
Ng, S T; Xie, J and Kumaraswamy, M M (2010) Simulating the effect of risks on equity return for concession-based public-private partnership projects. Engineering, Construction and Architectural Management, 17(4), pp. 352-368. ISSN 0969-9988
Ng, S T; Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(1), pp. 77-97. ISSN 1471-4175
Ngoma, S; Mundia, M and Kaliba, C (2014) Benefits, constraints and risks in infrastructure development via public-private partnerships in Zambia. Journal of Construction in Developing Countries, 19(1), pp. 15-33. ISSN 1823-6499
Ngowi, A B (1998) Is construction procurement a key to sustainable development? Building Research & Information, 26(6), pp. 340-350. ISSN 0961-3218
Ngowi, A B and Pienaar, E (2005) Trust factor in construction alliances. Building Research & Information, 33(3), pp. 267-278. ISSN 0961-3218
Ngozwana, M N (2018) Career aspirations of construction TVET learners in South Africa. PhD thesis, University of Pretoria, South Africa.
Nguyen, V T; Do, S T; Tran, C N N and van Pham, L (2025) Analysis of interrelationships among constructs of cost overrun causes in consortium projects between construction contractors. International Journal of Construction Management, 25(13), pp. 1596-1608. ISSN 1562-3599
Nguyen, A; Mollik, A and Chih, Y Y (2018) Managing critical risks affecting the financial viability of public-private partnership projects: Case study of toll road projects in Vietnam. Journal of Construction Engineering and Management, 144(12): 05018014, ISSN 0733-9364
Nguyen, Anh Chi (2023) Risk allocation, decision rights, and adaptive lifecycle project management practices in public-private partnership highway contracts in Australia, the Philippines, and India. PhD thesis, Virginia Tech, USA.
Nguyen, D A; Garvin, M J and Gonzalez, E E (2018) Risk allocation in U.S. Public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5): 04018017, ISSN 0733-9364
Nguyen, H D; Nguyen, T A; Doan, V V and Dang, C N (2025) Assessing critical barriers and success factors of PPP projects in emerging economies: A case of Vietnam. Journal of Engineering, Design and Technology, 23(3), pp. 792-811. ISSN 1726-0531
Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364
Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public-private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X
Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public–private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X
Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.
Nguyen Van, D; Le Dinh, T and Tran, H-B (2022) Assessing stakeholder satisfaction in PPP transport projects in developing countries: Evidence from Vietnam. Built Environment Project and Asset Management, 12(2), pp. 309-324. ISSN 2044-124X
Nhat, M N; Lewis, J; Beer, M and Boussabaine, A (2014) A pilot-study investigating the assessment and allocation of risks in public-private partnership transportation projects in Vietnam. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Nifa, F A A and Ahmed, V (2010) The role of organizational culture in construction partnering to produce innovation. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Nilsson Vestola, E and Eriksson, P E (2023) Engineered and emerged collaboration: Vicious and virtuous cycles. Construction Management and Economics, 41(1), pp. 79-96. ISSN 01446193
Nimesha Sahani, J; Chan, D W M and Kumaraswamy, M (2021) A systematic literature review and analysis towards developing PPP models for delivering smart infrastructure. Built Environment Project and Asset Management, 11(1), pp. 121-137. ISSN 2044-124X
Nirupama, N (2012) Risk and vulnerability assessment: A comprehensive approach. International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 103-114. ISSN 1759-5916
Niu, Y; Anumba, C and Lu, W (2019) Taxonomy and deployment framework for emerging pervasive technologies in construction projects. Journal of Construction Engineering and Management, 145(5): 04019028, ISSN 0733-9364
Noor, Muhammad Ali (2012) Investigating the role of procurement practices in effective implementation of infrastructure projects in a developing country: A case of Pakistan. PhD thesis, RMIT University, Australia.
Nwazota, A (2023) Special purpose vehicle for infrastructure project financing through public private partnerships: the answer to infrastructure problems in developing countries? PhD thesis, University of Manchester, UK.
Nyagormey, J J; Baiden, B K; Nani, G and Adinyira, E (2020) Review on criteria for evaluating unsolicited public-private partnership PPP proposals from 2004 to 2018. International Journal of Construction Management, 22(12), pp. 2243-2257. ISSN 1562-3599
Nyein, T S and Hadikusumo, B H W (2021) Factors influencing the adoption of public-private partnership in low-cost housing development in Myanmar. Journal of Financial Management of Property and Construction, 26(3), pp. 337-365. ISSN 1366-4387
Nyongesa, H O; Musumba, G W and Chileshe, N (2017) Partner selection and performance evaluation framework for a construction-related virtual enterprise: A multi-agent systems approach. Architectural Engineering and Design Management, 13(5), pp. 344-364. ISSN 1745-2007
Nyqvist, R; Peltokorpi, A; Lavikka, R and Ainamo, A (2025) Artificial intelligence driven platforms in the construction industry: Implications for companies' business models. Construction Innovation, 25(7), pp. 409-443. ISSN 1471-4175
Nyqvist, Roope (2025) Data-driven transformation in construction management: From artificial intelligence to network modeling. PhD thesis, Aalto University, Finland.
Nystrom, J (2006) The naivety of partnering assessments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Nyström, J (2005) The definition of partnering as a wittgenstein family-resemblance concept. Construction Management and Economics, 23(5), pp. 473-481. ISSN 01446193
Nyström, J (2007) Partnering: Definition, theory and evaluation. PhD thesis, KTH Royal Institute of Technology, Sweden.
Nyström, J (2008) A quasi-experimental evaluation of partnering. Construction Management and Economics, 26(5), pp. 531-541. ISSN 1466433X
Obonyo, E A (2004) Apron: Agent-based specification and procurement of construction products. EngD thesis, Loughborough University, UK.
Odoemena, A T and Horita, M (2018) A strategic analysis of contract termination in public-private partnerships: Implications from cases in Sub-Saharan Africa. Construction Management and Economics, 36(2), pp. 96-108. ISSN 0144-6193
Ofori, G (2002) Singapore's construction: Moving toward a knowledge-based industry. Building Research & Information, 30(6), pp. 401-412. ISSN 0961-3218
Ogunlana, S O (1999) Procurement lessons from Solomon's temple project. Journal of Construction Procurement, 5(2), pp. 187-196. ISSN 1358-9180
Ogwueleka, A C and Maritz, M J (2016) Modeling for incentive payoffs in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(3), pp. 543-562.
Ojebode, A J (2016) Public-private partnership (PPP) as a mechanism for the provision of affordable housing delivery in Nigeria. PhD thesis, University of Brighton, UK.
Ojelabi, R A; Oyeyipo, O O; Afolabi, A O and Omuh, I O (2022) Evaluating barriers inhibiting investors participation in public-private partnership project bidding process using structural equation model. International Journal of Construction Management, 22(16), pp. 3055-3064. ISSN 1562-3599
Ojiako, U; Papadopoulos, T; Stamati, T; Anagnostopoulos, D and Marshall, A (2015) Collaborative governance in Greek infrastructure projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 135-145. ISSN 17514304
Ojode, L A (2000) A resource -based view of strategic alliances: Organizational capabilities, governance, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Ojuri, Omoleye B (2020) Prescribing social value co-creation in networks for the Nigerian water supply sector. PhD thesis, University College London, UK.
Oke, A. E.; Adekunye, O. J.; Adeosun, F. E.; Aliu, J.; Akanni, P. O.; Aghimien, D. and Aigbavboa, C. O. (2026) Assessment of the challenges of integrating cyber-physical systems in Nigerian construction. Engineering, Construction and Architectural Management, 33(4), pp. 3146-3163. ISSN 0969-9988
Oke, A E; Aliu, J; Ehiosun, L U; Ebekozien, A and Rotimi, A A (2024) From hurdles to heights: Blueprint for tackling distributed ledger technology challenges in the construction sector of a developing economy. Journal of Financial Management of Property and Construction, 29(3), pp. 405-424. ISSN 1366-4387
Okika, M C; Vermeulen, A and Pretorius, J H C (2025) A systematic approach to identify and manage supply chain risks in construction projects. Journal of Financial Management of Property and Construction, 30(1), pp. 42-66. ISSN 1366-4387
Okoro, C; Muleya, F and Musonda, I (2022) Assessing the role of planning and considerations in the sustainability of brt-PPP projects: A South African case. Journal of Construction in Developing Countries, 27(2), pp. 205-234. ISSN 1823-6499
Okoro, C; Nnaji, C; Chileshe, N and Tembo, J (2023) Perceptions of public-private partnerships transportation project success factors in developing countries: An explanatory sequential investigation. Journal of Construction in Developing Countries, 28(2), pp. 295-327. ISSN 1823-6499
Okoroh, M I; Goulding, J S and Walker, S (2006) Outsourcing local authorities housing stocks. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Okudan, O; Budayan, C and Dikmen, I (2020) Development of a conceptual life cycle performance measurement system for build-operate-transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988
Okudan, O; Budayan, C and Dikmen, I (2021) Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988
Okudan, O and Çevikbaş, M (2022) Alternative dispute resolution selection framework to settle disputes in public-private partnership projects. Journal of Construction Engineering and Management, 148(9): 04022086, ISSN 0733-9364
Okwilagwe, O (2017) Collaboration processes in partnership working: local regeneration in Nigeria. PhD thesis, Bournemouth University, UK.
Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), pp. 60-79. ISSN 1366-4387
Olatunji, S O; Olawumi, T O and Aje, I O (2017) Rethinking partnering among quantity-surveying firms in Nigeria. Journal of Construction Engineering and Management, 143(11): 05017018, ISSN 0733-9364
Olawumi, T O and Chan, D W M (2020) Key drivers for smart and sustainable practices in the built environment. Engineering, Construction and Architectural Management, 27(6), pp. 1257-1281. ISSN 0969-9988
Olcar, Ç Ö (2021) A model for exploring evolution of strategic alliances in project-based industries-the case of construction industry. PhD thesis, Izmir Institute of Technology, Turkey.
Oliveros Romero, Jose Alejandro (2019) Ex-post impact evaluation method for public-private partnership projects from the perspective of multiple stakeholders. PhD thesis, University of Melbourne, Australia.
Oliveros-Romero, J and Aibinu, A A (2019) Ex post impact evaluation of PPP projects: An exploratory research. Built Environment Project and Asset Management, 9(2), pp. 315-330. ISSN 2044-124X
Oliveros-Romero, J and Aibinu, A A (2023) Ex-post impact evaluation of PPP projects from multiple stakeholder perspectives: A toll road case. Built Environment Project and Asset Management, 13(4), pp. 574-589. ISSN 2044-124X
Oliveros-Romero, J and Paton-Cole, V P (2023) Infrastructure development: Reflections on Sierra Leone infrastructure scheme and the lungi bridge project. Journal of Financial Management of Property and Construction, 28(1), pp. 127-144. ISSN 1366-4387
Olojede, B O; Opawole, A; Jagboro, G O and Alao, O O (2023) Examination of roles performed by public sector organizations in the procurement of public-private partnership projects. International Journal of Building Pathology and Adaptation, 41(2), pp. 495-511. ISSN 23984708
Omopariola, E D; Olanrewaju, O I; Albert, I; Oke, A E and Ibiyemi, S B (2024) Sustainable construction in the Nigerian construction industry: Unsustainable practices, barriers and strategies. Journal of Engineering, Design and Technology, 22(4), pp. 1158-1184. ISSN 1726-0531
Omotayo, M (2020) Developing public-private partnership (PPP) in Nigerian railway corporation: The governance challenge. PhD thesis, University of Manchester, UK.
Omotayo, T S; Danvers-Watson, O and Oyegoke, A S (2023) Subcontractor trust issues on payment and valuation practices in UK private projects. Journal of Financial Management of Property and Construction, 28(1), pp. 64-90. ISSN 1366-4387
Ong, H C (2003) A new model of public private partnerships for affordable housing in Malaysia. PhD thesis, University of Salford, UK.
Ongel, B; Tanyer, A M and Dikmen, I (2024) A network-based model for the assessment of success in PPP healthcare projects. International Journal of Construction Management, 24(8), pp. 875-887. ISSN 1562-3599
Opawole, A (2018) Penalty mechanisms for enforcing concessionaire performance in public-private partnership contracts in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 161-191.
Opawole, A and Jagboro, G O (2018) Compensation mechanisms for minimizing private party risks in concession-based public-private partnership contracts. International Journal of Building Pathology and Adaptation, 36(1), pp. 93-120. ISSN 23984708
Opoku, A and Mills, S A (2019) Exploring the use of standardised design in addressing the shortage of primary school places in the UK. Journal of Engineering, Design and Technology, 17(2), pp. 383-401. ISSN 1726-0531
Orero, E (2019) Exploring options in infrastructure financing in Africa: steering of public private partnerships (PPPs) in Kenya. PhD thesis, Royal Holloway, University of London, UK.
Organ, S (2020) The opportunities and challenges of improving the condition and sustainability of a historic building at an international tourist attraction in the UK. International Journal of Building Pathology and Adaptation, 38(2), pp. 329-355. ISSN 23984708
Orstavik, F and Harty, C (2017) The unexplored brutality of performance recipes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387
Osei-Kyei, R. and Chan, A. P. C. (2017) Implementing public–private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications. International Journal of Construction Management, 17(2), pp. 113-123. ISSN 1562-3599
Osei-Kyei, R. and Chan, A. P. C. (2019) Model for predicting the success of public–private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007
Osei-Kyei, R and Chan, A P C (2017) Implementing public-private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications. International Journal of Construction Management, 17(2), pp. 113-123. ISSN 1562-3599
Osei-Kyei, R and Chan, A P C (2017) Risk assessment in public-private partnership infrastructure projects: Empirical comparison between Ghana and Hong Kong. Construction Innovation, 17(2), pp. 204-223. ISSN 1471-4175
Osei-Kyei, R and Chan, A P C (2017) Empirical comparison of critical success factors for public-private partnerships in developing and developed countries: A case of Ghana and Hong Kong. Engineering, Construction and Architectural Management, 24(6), pp. 1222-1245. ISSN 0969-9988
Osei-Kyei, R and Chan, A P C (2017) Factors attracting private sector investments in public-private partnerships in developing countries: A survey of international experts. Journal of Financial Management of Property and Construction, 22(1), pp. 92-111. ISSN 1366-4387
Osei-Kyei, R and Chan, A P C (2018) Evaluating the project success index of public-private partnership projects in Hong Kong: The case of the Cross Harbour Tunnel. Construction Innovation, 18(3), pp. 371-391. ISSN 1471-4175
Osei-Kyei, R and Chan, A P C (2019) Model for predicting the success of public-private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007
Osei-Kyei, R; Chan, A P C and Dansoh, A (2020) Project selection index for unsolicited public-private partnership proposals. International Journal of Construction Management, 20(6), pp. 555-566. ISSN 1562-3599
Osei-Kyei, R; Chan, A P C; Dansoh, A; Ofori-Kuragu, J K and Owusu, E K (2018) Motivations for adopting unsolicited proposals for public-private partnership project implementation: A survey of international experts. Journal of Financial Management of Property and Construction, 23(2), pp. 221-238. ISSN 1366-4387
Osei-Kyei, R; Chan, A P C; Yao, Y and Mazher, K M (2019) Conflict prevention measures for public-private partnerships in developing countries. Journal of Financial Management of Property and Construction, 24(1), pp. 39-57. ISSN 1366-4387
Osei-Kyei, R; Jin, X; Nnaji, C; Akomea-Frimpong, I and Wuni, I Y (2023) Review of risk management studies in public-private partnerships: A scientometric analysis. International Journal of Construction Management, 23(14), pp. 2419-2430. ISSN 1562-3599
Osei-Kyei, R; Narbaev, T; Atafo-Adabre, M; Chileshe, N and Ofori-Kuragu, J K (2023) Critical success criteria for retirement village public: private partnership housing. Construction Innovation, 23(5), pp. 1018-1037. ISSN 1471-4175
Oshin-Martin, M (2014) Managing beyond the contract: Communicating and connecting to build sustainable collaborative relationships in international public-private partnerships. DM thesis, University of Maryland University College, USA.
Osipova, E (2013) On enhancing joint risk management throughout a project's lifecycle: Empirical studies of Swedish construction projects. PhD thesis, Luleå University of Technology, Sweden.
Osipova, E and Eriksson, P E (2011) How procurement options influence risk management in construction projects. Construction Management and Economics, 29(11), pp. 1149-1158. ISSN 1466433X
Otegbulu, A C (2011) A contingent valuation model for assessing electricity demand. Journal of Financial Management of Property and Construction, 16(2), pp. 126-146. ISSN 1366-4387
Othman, A and Abdellatif, M (2011) Partnership for integrating the corporate social responsibility of project stakeholders towards affordable housing development: A South African perspective. Journal of Engineering, Design and Technology, 9(3), pp. 273-295. ISSN 1726-0531
Othman, A A E and Mahmoud, N A (2022) Public-private partnerships as an approach for alleviating risks associated with adaptive reuse of heritage buildings in Egypt. International Journal of Construction Management, 22(9), pp. 1713-1735. ISSN 1562-3599
Owolabi, H; Oyedele, L; Alaka, H; Ajayi, S; Bilal, M and Akinade, O (2020) Risk mitigation in PFI/PPP project finance: A framework model for financiers' bankability criteria. Built Environment Project and Asset Management, 10(1), pp. 28-49. ISSN 2044-124X
Owusu-Manu, D G; Adjei, T K; Sackey, D M; Edwards, D J and Hosseini, R M (2021) Mainstreaming sustainable development goals in Ghana’s energy sector within the framework of public–private partnerships: Challenges, opportunities and strategies. Journal of Engineering, Design and Technology, 19(3), pp. 605-624. ISSN 1726-0531
Owusu-Manu, D G; Edwards, D J; Kukah, A S; Parn, E A; El-Gohary, H and Hosseini, M R (2018) An empirical examination of moral hazards and adverse selection on PPP projects: A case study of Ghana. Journal of Engineering, Design and Technology, 16(6), pp. 910-924. ISSN 1726-0531
Owusu-Manu, D G; Kukah, A S; Boateng, F; Asumadu, G and Edwards, D J (2021) Exploring strategies to reduce moral hazard and adverse selection of Ghanaian public–private partnership (PPP) construction projects. Journal of Engineering, Design and Technology, 19(2), pp. 358-372. ISSN 1726-0531
Owusu-Manu, D G; Kukah, A S; Edwards, D J; Pärn, E A; El-Gohary, H and Aigbavboa, C (2018) Causal relationships of moral hazard and adverse selection of Ghanaian public-private-partnership (PPP) construction projects. Journal of Engineering, Design and Technology, 16(3), pp. 439-460. ISSN 1726-0531
Owusu-Manu, D G; Kukah, A S K; Edwards, D J and Ameyaw, E E (2023) Fuzzy synthetic evaluation of moral hazard and adverse selection of public private partnership projects. International Journal of Construction Management, 23(11), pp. 1805-1814. ISSN 1562-3599
Owusu-Manu, D-G; Edwards, D J; Kutin-Mensah, E K; Kilby, A; Parn, E and Love, P E (2017) The impact of socio-political and economic environments on private sector participation in energy infrastructure delivery in Ghana. Journal of Engineering, Design and Technology, 15(2), pp. 166-180.
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988
Oyemomi, B; Hare, B and Tong, M (2018) Exploring public-private partnership challenges and the effects on the construction workforce: A Scotland study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Pagani, A; Christie, D; Bourdon, V; Wall Gago, C; Joost, S; Licina, D; Lerch, M; Rozenblat, C; Guessous, I and Viganò, P (2023) Housing, street and health: A new systemic research framework. Buildings & Cities, 4(1), pp. 629-649. ISSN 2632-6655
Pahwa, J S (2009) MDSSF: a federated architecture for product procurement. PhD thesis, Cardiff University, UK.
Pal, I; Ghosh, S; Dash, I and Mukhopadhyay, A (2023) Review of tsunami early warning system and coastal resilience with a focus on Indian ocean. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 593-610. ISSN 1759-5916
Pala, M; Edum-Fotwe, F; Ruikar, K; Peters, C and Doughty, N (2012) Improving supplier relationship management within the AEC sector. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Palacios, J L; Gonzalez, V and Alarcón, L F (2014) Selection of third-party relationships in construction. Journal of Construction Engineering and Management, 140(4): B4013005, ISSN 0733-9364
Palihakkara, A D and Perera, B A K S (2022) Risk management in guaranteed maximum price (gmp) contracts. Smart and Sustainable Built Environment, 11(2), pp. 368-386. ISSN 2046-6099
Pan, H.; Yang, S.; Pan, Y.; Chu, W. and Yao, C. (2026) Research on the synergy mechanism and synergy degree of Chinese prefabricated buildings based on IAD and SEM-SNA analysis. Engineering, Construction and Architectural Management, ISSN 0969-9988
Pan, W and Pan, M (2023) Rethinking lean synergistically in practice for construction industry improvements. Engineering, Construction and Architectural Management, 30(7), pp. 2669-2690. ISSN 0969-9988
Pan, W and Sidwell, R (2011) Demystifying the cost barriers to offsite construction in the UK. Construction Management and Economics, 29(11), pp. 1081-1099. ISSN 1466433X
Pantelias, A (2009) A methodological framework for probabilistic evaluation of financial viability of transportation infrastructure under public private partnerships. PhD thesis, University of Texas at Austin, USA.
Papadonikolaki, E (2016) Alignment of partnering with construction it: Exploration and synthesis of network strategies to integrate BIM-enabled supply chains. PhD thesis, Delft University of Technology, Netherlands.
Papadonikolaki, E (2017) Grasping brutal and incremental BIM innovation through institutional logics. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Papadonikolaki, E; Verbraeck, A and Wamelink, H (2017) Formal and informal relations within BIM-enabled supply chain partnerships. Construction Management and Economics, 35(8-9), pp. 531-552. ISSN 01446193
Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2015) BIM adoption in integrated supply chains: A multiple case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2016) The interdependences of BIM and supply chain partnering: Empirical explorations. Architectural Engineering and Design Management, 12(6), pp. 476-494. ISSN 1745-2007
Papadonikolaki, E and Wamelink, H (2017) Inter- and intra-organizational conditions for supply chain integration with BIM. Building Research & Information, 45(6), pp. 649-664. ISSN 0961-3218
Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.
Pasqual, I R and Ekanayake, L (2025) Win–win approach to subcontracting in building construction: Sri Lankan perspective. Construction Economics and Building, 25(3-4), pp. 339-357. ISSN 2204-9029
Pasquire, C L and King, J H J (2000) Project team performance within the Scottish water market based private finance initiative. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531
Patil, N A and Laishram, B (2016) Public‒private partnerships from sustainability perspective: a critical analysis of the Indian case. International Journal of Construction Management, 16(2), pp. 161-174. ISSN 1562-3599
Patil, N A and Laishram, B S (2016) Sustainability of Indian PPP procurement process: Development of strategies for enhancement. Built Environment Project and Asset Management, 6(5), pp. 491-507. ISSN 2044-124X
Patil, S S (2000) Optimal owner contractor relationships based on capital project competencies. PhD thesis, Texas A&M University, USA.
Patsiadas, P and Angelides, D C (2008) Legislative frameworks for port concessions in Greece. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 157-162. ISSN 17514312
Patterson, D A; Farnsworth, C B; Hutchings, D M; Eggett, D L and Weidman, J E (2023) Comparing cost, schedule, and quality of CM/GC and DBB project delivery for repetitive commercial construction. International Journal of Construction Education and Research, 19(2), pp. 166-186. ISSN 1557-8771
Patterson, R L and Trebes, B (2015) NEC for DBFO: Taking best practice procurement into PPPs. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 213-219. ISSN 17514304
Peace, S L (1999) Partnering in the UK building industry. PhD thesis, University of Reading, UK.
Pearl, D S and Oliver, A (2015) The role of early-phase mining in reframing net-positive development. Building Research & Information, 43(1), pp. 34-48. ISSN 0961-3218
Pellegrino, R (2021) Effects of public supports for mitigating revenue risk in public-private partnership projects: Model to choose among support alternatives. Journal of Construction Engineering and Management, 147(12), ISSN 0733-9364
Pellegrino, R; Carbonara, N and Costantino, N (2019) Public guarantees for mitigating interest rate risk in PPP projects. Built Environment Project and Asset Management, 9(2), pp. 248-261. ISSN 2044-124X
Pellegrino, R; Vajdic, N and Carbonara, N (2013) Real option theory for risk mitigation in transport PPPs. Built Environment Project and Asset Management, 3(2), pp. 199-213. ISSN 2044-124X
Perera, U T G; Haigh, R and Amaratunga, D (2025) Integration of public health into road projects in Sri Lanka: Identifying barriers and enablers. Built Environment Project and Asset Management, 15(3), pp. 647-662. ISSN 2044-124X
Perrin, R and Price, A D F (2004) Developing teams and the allocation of rewards within a team environment. Journal of Construction Procurement, 10(2),
Phillips, S; Martin, J; Dainty, A and Price, A (2008) Analysis of the quality attributes used in establishing best value tenders in the UK social housing sector. Engineering, Construction and Architectural Management, 15(4), pp. 307-320. ISSN 0969-9988
Phillips-Alonge, O K (2017) The influence of partnering on the occurrence and cost of construction conflicts and disputes. PhD thesis, Northcentral University, USA.
Phillips-Alonge, O K (2019) The influence of partnering on the occurrence of construction requirement conflicts and disputes. International Journal of Construction Management, 19(4), pp. 291-306. ISSN 1562-3599
Phua, F T T (2006) When is construction partnering likely to happen? An empirical examination of the role of institutional norms. Construction Management and Economics, 24(6), pp. 615-624. ISSN 1466433X
Phua, F T T and Rowlinson, S (2003) Cultural differences as an explanatory variable for adversarial attitudes in the construction industry: The case of Hong Kong. Construction Management and Economics, 21(7), pp. 777-785. ISSN 01446193
Phua, F T T and Rowlinson, S (2004) Operationalizing culture in construction management research: A social identity perspective in the Hong Kong context. Construction Management and Economics, 22(9), pp. 913-925. ISSN 01446193
Phyu, H. T. (2026) A systematic review of transparency in public-private partnerships: Current trends and future research directions. International Journal of Construction Management, 26(9), pp. 1905-1924. ISSN 1562-3599
Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.
Picchi, P; Verzandvoort, S; Geneletti, D; Hendriks, K and Stremke, S (2022) Deploying ecosystem services to develop sustainable energy landscapes: A case study from the Netherlands. Smart and Sustainable Built Environment, 11(3), pp. 422-437. ISSN 2046-6099
Pietroforte, R and Miller, J B (2002) Procurement methods for us infrastructure: Historical perspectives and recent trends. Building Research & Information, 30(6), pp. 425-434. ISSN 0961-3218
Pinheiro, A T K and Hokugo, A (2019) Effectiveness of early warning and community cooperation for evacuation preparedness from mega-risk type coastal hazard in childcare centers. International Journal of Disaster Resilience in the Built Environment, 10(4), pp. 260-275. ISSN 1759-5916
Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.
Pishdad-Bozorgi, P and Beliveau, Y J (2016) A schema of trust building attributes and their corresponding integrated project delivery traits. International Journal of Construction Education and Research, 12(2), pp. 142-160. ISSN 1557-8771
Pocock, J B; Hyun, C T; Liu, L Y and Kim, M K (1996) Relationship between project interaction and performance indicators. Journal of Construction Engineering and Management, 122(2), pp. 165-176. ISSN 0733-9364
Polat, F and Demirkesen, S (2025) Measuring the impact of lean implementation on BIM and project success: Case of construction firms. Engineering, Construction and Architectural Management, 32(9), pp. 5839-5862. ISSN 0969-9988
Potemans, A; Volker, L and Hermans, M (2018) From agents to stewards? Experiences from a Dutch infrastructure case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Pourafshar, O; Barmayehvar, B; Esmaeilabadi, R and Asnaashari, E (2025) An integrated FAHP-SD model to assess and allocate of critical risks for public-private partnership transportation projects. International Journal of Construction Management, 25(6), pp. 605-623. ISSN 1562-3599
Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.
Proverbs, D G and Holt, G D (1999) The strive for productivity and quality: Views of UK project managers. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Pryke, S D (2004) Analysing construction project coalitions: Exploring the application of social network analysis. Construction Management and Economics, 22(8), pp. 787-797. ISSN 01446193
Pryke, S D (2005) Towards a social network theory of project governance. Construction Management and Economics, 23(9), pp. 927-939. ISSN 01446193
Pryke, Stephen David (2002) UK construction in transition: developing a social network approach to the evaluation of new procurement and management strategies. PhD thesis, University College London, UK.
Pu, W; Xu, F; Chen, R and Marques, R C (2020) PPP project procurement model selection in China: Does it matter? Construction Management and Economics, 38(2), pp. 126-139. ISSN 01446193
Pu, W; Xu, F and Marques, R C (2021) A bibliometric and meta-analysis of studies on public-private partnership in China. Construction Management and Economics, 39(9), pp. 773-789. ISSN 01446193
Puddicombe, M S (1997) Designers and contractors: Impediments to integration. Journal of Construction Engineering and Management, 123(3), pp. 245-252. ISSN 0733-9364
Pulkka, L and Junnila, S (2015) Gravitational slingshot analogy of discontinuous sustainability innovation in the construction industry. Construction Innovation, 15(4), pp. 409-427. ISSN 1471-4175
Pérez-Bou, S; Kishnani, N and Dutta, A (2024) Human factors for a successful integrated design process in zero energy buildings: Leadership, trust, and goal orientation: A case study in Singapore. Architectural Engineering and Design Management, 20(4), pp. 928-945. ISSN 1745-2007
Qi, X; Du, Q; Zou, P X W and Huang, N (2024) Developing a weighted synergy network-based model for selecting prefabricated construction services. Engineering, Construction and Architectural Management, 31(6), pp. 2306-2326. ISSN 0969-9988
Qu, Yingying (2017) An investigation of opportunistic behaviour in public-private partnerships. PhD thesis, University of New South Wales, Australia.
Qu Y, L M (2013) A meta-analysis of opportunistic behaviour in public-private partnerships: Manifestations and antecedents. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Rafaat, R; Osman, H; Georgy, M and Elsaid, M (2020) Preferred risk allocation in egypt's water sector PPPs. International Journal of Construction Management, 20(6), pp. 585-597. ISSN 1562-3599
Ragab, M A and Marzouk, M (2021) BIM adoption in construction contracts: Content analysis approach. Journal of Construction Engineering and Management, 147(8): 0002123, ISSN 0733-9364
Rahat, R; Ferrer, V; Pradhananga, P and ElZomor, M (2023) A pedagogical paradigm to support infrastructure projects through coupling front-end planning techniques with sustainability practices. International Journal of Construction Education and Research, 19(3), pp. 276-298. ISSN 1557-8771
Rahimi, Y; Tavakkoli-Moghaddam, R; Iranmanesh, S H and Vaez-Alaei, M (2018) Hybrid approach to construction project risk management with simultaneous FMEA/ISO 31000/evolutionary algorithms: Empirical optimization study. Journal of Construction Engineering and Management, 144(6): 04018043, ISSN 0733-9364
Rahman, H A (1993) The management and cost of quality for civil engineering projects. PhD thesis, University of Manchester, UK.
Rahman, M M (2002) Joint risk management through transactionally efficient relational contracting. Construction Management and Economics, 20(1), pp. 45-54. ISSN 01446193
Rahman, M M and Alhassan, A (2012) A contractor's perception on early contractor involvement. Built Environment Project and Asset Management, 2(2), pp. 217-233. ISSN 2044-124X
Rahman, M M and Kumaraswamy, M M (2005) Relational selection for collaborative working arrangements. Journal of Construction Engineering and Management, 131(10), pp. 1087-1098. ISSN 0733-9364
Rahman, M M and Kumaraswamy, M M (2012) Multicountry perspectives of relational contracting and integrated project teams. Journal of Construction Engineering and Management, 138(4), pp. 469-480. ISSN 0733-9364
Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988
Raidén, A B; Dainty, A R J and Neale, R H (2008) Understanding employee resourcing in construction organizations. Construction Management and Economics, 26(11), pp. 1133-1143. ISSN 1466433X
Raisbeck, P (2008) Perceptions of architectural design and project risk: Understanding the architects' role in a PPP project. Construction Management and Economics, 26(11), pp. 1145-1157. ISSN 1466433X
Raisbeck, P (2009) Considering design and PPP innovation: A review of design factors in PPP research. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Raisbeck, P; Duffield, C and Xu, M (2010) Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(4), pp. 345-359. ISSN 1466433X
Raisbeck, P and Tang, L C M (2013) Identifying design development factors in Australian PPP projects using an AHP framework. Construction Management and Economics, 31(1), pp. 20-39. ISSN 1466433X
Rajan, T; Siddharth, R and Mukund, S P (2010) PPPs in road renovation and maintenance: A case study of the East Coast Road project. Journal of Financial Management of Property and Construction, 15(1), pp. 21-40. ISSN 1366-4387
Ran, X (2025) Research on the relationship between core competitiveness of interior design companies and its performance under the circumstance of decline. DBA thesis, Arizona State University, USA.
Rasheed, N; Shahzad, W M and Rotimi, J O B (2024) Factor analysis of risk allocation criteria (rac) in public-private partnership (PPP) projects: A case of New Zealand. Construction Economics and Building, 24(4-5), pp. 142-159. ISSN 2204-9029
Reaney, M; Griffith, A; Watson, P A and Ellis, C (2000) Optimizing functional relationships for new residential developments. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Regan, M; Smith, J and Love, P E D (2011) Impact of the capital market collapse on public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 137(1), pp. 6-16. ISSN 0733-9364
Regeczi, David Joseph (2008) Private equity, public principle: Evaluating the legitimacy and sustainability of public-private partnerships. PhD thesis, University of Twente, Netherlands.
Ren, F; Huang, Y; Xia, Z; Xu, X; Li, X; Chi, J; Li, J; Wang, Y and Song, J (2025) Do public-private partnerships (PPPs) promote the sustainable development of infrastructure (sdi)? Evidence from China. Engineering, Construction and Architectural Management, 32(11), pp. 7587-7621. ISSN 0969-9988
Renukappa, S and Akintoye, A (2011) Potential opportunities for the UK construction industry in the water sector. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Reszka, M and Edwards, P J (1997) Joint ventures: A construction project case study. Journal of Financial Management of Property and Construction, 2(2), pp. 5-20. ISSN 1366-4387
Ribeiro, F L (1998) Project delivery methods for large scale building projects: A case study. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Ribeiro, F L (1998) Delivering large scale building projects: a case study. Journal of Construction Procurement, 4(2), pp. 77-88. ISSN 1358-9180
Rizzi, Dario (2025) Tools for sustainable design strategies: Optimization of integrated BIM-blockchain technologies and protocols for the application of minimum environmental criteria. PhD thesis, Università degli Studi di Ferrara, Italy.
Robert, O K; Dansoh, A and Ofori-Kuragu, J K (2014) Reasons for adopting public-private partnership (PPP) for construction projects in Ghana. International Journal of Construction Management, 14(4), pp. 227-238. ISSN 1562-3599
Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(2), pp. 181-197. ISSN 1466433X
Rochat, Matthew James (2025) Chinese economic engagement in Africa and West African maritime ports. PhD thesis, University of California, Santa Barbara, USA.
Rodger, D; Callaghan, N and Thomson, C (2019) The integration of retrofit practice within social housing. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Rogan, A (1999) Inter-organisational relationships in the construction process. PhD thesis, University of the West of England, Bristol, UK.
Rohman, M A (2022) Assessment of the government's role performance in public-private partnership (PPP) toll road projects in Indonesia. Journal of Financial Management of Property and Construction, 27(2), pp. 239-258. ISSN 1366-4387
Rohman, M A and Wiguna, I P A (2021) Evaluation of road design performance in delivering community project social benefits in Indonesian PPP. International Journal of Construction Management, 21(11), pp. 1130-1142. ISSN 1562-3599
Rohman, Mohammad Arif (2017) Stakeholders' perspective on achieving project social benefit from Indonesian toll roads. PhD thesis, University of Melbourne, Australia.
Rosander, L (2022) Same same but different: Dynamics of a pre-procurement routine and its influence on relational contracting models. Construction Management and Economics, 40(11-12), pp. 955-972. ISSN 01446193
Rosander, L and Kadefors, A (2019) From project to policy: Implementing a collaborative procurement strategy in a public client organisation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Rossenbach, T D (2018) The development of a management accounting system for decentralised construction companies. PhD thesis, University of Gloucestershire, UK.
Rossi, Mônica Therezinha Bartie (2012) Social housing and associative management, evaluation of the programs promoted by the state government of São Paulo in the period of 1990 to 2008. PhD thesis, Universidade de São Paulo, Brazil.
Rouhparvar, M; Babaei, F and Navidi, H (2025) Cooperative game theory approach towards capital equipment procurement in construction projects: a concrete batch plant case study. International Journal of Construction Management, 25(8), pp. 899-910. ISSN 1562-3599
Roumboutsos, A and Anagnostopoulos, K P (2008) Public private partnership projects in Greece: Risk ranking and preferred risk allocation. Construction Management and Economics, 26(7), pp. 751-763. ISSN 1466433X
Roumboutsos, A and Chiara, N (2010) A strategic partnering framework analysis methodology for public-private partnerships. Journal of Financial Management of Property and Construction, 15(3), pp. 235-246. ISSN 1366-4387
Roumboutsos, A and Saussier, S (2014) Public-private partnerships and investments in innovation: The influence of the contractual arrangement. Construction Management and Economics, 32(4), pp. 349-361. ISSN 01446193
Roumboutsos, A; Suárez Alemán, A and Ågren, R (2017) Construction firms in public-private partnerships: A place to grow. Construction Management and Economics, 35(10), pp. 627-640. ISSN 0144-6193
Rovira-Beleta, E; Cuerva, E; Pires de Souza, E; Planas, C and Alavedra, P (2015) Accessibility of emergency evacuation of persons with disabilities in public swimming pools in barcelona, Spain: A review of literature and regulations. Architectural Engineering and Design Management, 11(6), pp. 475-487. ISSN 1745-2007
Rowlands, A S (2016) Effective collaboration in construction: the importance of managing power. PhD thesis, University of Birmingham, UK.
Rowlinson, S; Matthews, J; Phua, F; McDermott, P and Chapman, T (2000) Emerging issues in procurement systems. Journal of Construction Procurement, 6(2), ISSN 1358-9180
Ruan, X (2007) Inter-organizational knowledge integration on construction projects: a social network approach. PhD thesis, Northumbria University, UK.
Ruff, C M; Dzombak, D A and Hendrickson, C T (1996) Owner-contractor relationships on contaminated site remediation projects. Journal of Construction Engineering and Management, 122(4), pp. 348-353. ISSN 0733-9364
Rwelamila, P D (2002) Creating an effective construction industry strategy in South Africa. Building Research & Information, 30(6), pp. 435-445. ISSN 0961-3218
Rwelamila P D, H C M S (2013) Capacity building in emerging economies through international construction ventures: Case study of the nmpp project. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Sacks, R; Eastman, C M and Lee, G (2004) Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry. Journal of Construction Engineering and Management, 130(2), pp. 206-215. ISSN 0733-9364
Sacks, R and Harel, M (2006) An economic game theory model of subcontractor resource allocation behaviour. Construction Management and Economics, 24(8), pp. 869-881. ISSN 1466433X
Sacks, R; Koskela, L; Dave, B A and Owen, R (2010) Interaction of lean and building information modeling in construction. Journal of Construction Engineering and Management, 136(9), pp. 968-980. ISSN 0733-9364
Sacks, R; Treckmann, M and Rozenfeld, O (2009) Visualization of work flow to support lean construction. Journal of Construction Engineering and Management, 135(12), pp. 1307-1315. ISSN 0733-9364
Sadeh, H; Mirarchi, C; Shahbodaghlou, F and Pavan, A (2023) BIM feasibility for small and medium-sized contractors and subcontractors. International Journal of Construction Management, 23(6), pp. 999-1008. ISSN 1562-3599
Sadullah, M; Ghazali, M and Rashid, A (2018) Critical success factors in a public–private partnership highway project in Malaysia: Ampang–Kuala Lumpur elevated highway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 234-242. ISSN 17514304
Saeed, A M; Duffield, C and Hui, F K P (2018) An enhanced framework for assessing the operational performance of public-private partnership school projects. Built Environment Project and Asset Management, 8(2), pp. 194-214. ISSN 2044-124X
Saifi, S and Anandakumar, R M (2025) Web-based visualization and rendering of aerial lidar point cloud for urban flood simulation. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 260-274. ISSN 1759-5908
Saini, M (2015) A framework for transferring and sharing tacit knowledge in construction supply chains within lean and agile processes. PhD thesis, University of Salford, UK.
Salama, T and Said, H (2025) Agility assessment framework for modular and offsite construction. Construction Innovation, 25(2), pp. 193-223. ISSN 1471-4175
Salazar, L A; Ballard, G; Arroyo, P and Alarcón, L F (2022) Development of a commitment management system for construction projects. Journal of Construction Engineering and Management, 148(12): 05022012, ISSN 0733-9364
Salcedo, R T B and Straub, A (2016) The role of the architect using integrated contracts for social housing renovation projects. Journal of Engineering, Design and Technology, 14(4), pp. 802-817.
Salonen, A (2006) Relational risk and relationship management in facilities management partnerships. PhD thesis, Helsinki University of Technology, Finland.
Sanda, Y N; Anigbogu, N A; Izam, Y D and Nuhu, L Y (2022) Managing stakeholder opportunism in public-private partnership (PPP) housing projects. Journal of Construction in Developing Countries, 27(1), pp. 213-228. ISSN 1823-6499
Santoso, D S; Joewono, T B; Wibowo, A; Sinaga, H P A and Santosa, W (2012) Public-private partnerships for tollway construction and operation: Risk assessment and allocation from the perspective of investors. Journal of Construction in Developing Countries, 17(2), pp. 45-66. ISSN 1823-6499
Sarhan, S (2018) Institutional waste within the UK construction industry: an exploratory study. PhD thesis, Nottingham Trent University, UK.
Sarie Eldin, H S (1995) Consortia agreements in the international construction industry: With special reference to Egypt. PhD thesis, Queen Mary University of London, UK.
Sarshar, M; Haigh, R and Amaratunga, D (2004) Improving project processes: Best practice case study. Construction Innovation, 4(2), pp. 69-82. ISSN 1471-4175
Sarvari, H; Nassereddine, H; Chan, D W M; Amirkhani, M and Md Noor, N (2021) Determining and assessing the significant barriers of transferring unfinished construction projects from the public sector to the private sector in Iran. Construction Innovation, 21(4), pp. 592-607. ISSN 1471-4175
Satish, S. and Umar, T. (2026) Bridging innovation and practice: Assessing the readiness for 3D printing in construction. Engineering, Construction and Architectural Management, 33(7), pp. 6014-6038. ISSN 0969-9988
Savage, D (2010) Business networks and conflict management. PhD thesis, Queen's University Belfast, UK.
Schaefer, K K (2024) Community insurance as a flood management element in California. PhD thesis, University of California, Davis, USA.
Scheublin, F J M (2001) Project alliance contract in the Netherlands. Building Research & Information, 29(6), pp. 451-455. ISSN 0961-3218
Schipper, E L F; Thomalla, F; Vulturius, G; Davis, M and Johnson, K (2016) Linking disaster risk reduction, climate change and development. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 216-228. ISSN 1759-5916
Schulte Jr., W D (1999) The effect of international corporate strategies and information and communication technologies on competitive advantage and firm performance: An exploratory study of the international engineering, procurement and construction (IEPC) industry. PhD thesis, George Washington University, USA.
Schönbeck, P (2022) Data based configuration decisions in hospital construction projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Scott, B O B (1995) Competitive advantage through alliancing. Engineering, Construction and Architectural Management, 2(2), pp. 83-92. ISSN 0969-9988
Sebastian, R (2011) Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18(2), pp. 176-187. ISSN 0969-9988
Selberherr, J (2015) Sustainable life cycle offers through cooperation. Smart and Sustainable Built Environment, 4(1), pp. 4-24. ISSN 2046-6099
Senghore, O; Hastak, M; Abdelhamid, T S; AbuHammad, A and Syal, M G (2004) Production process for manufactured housing. Journal of Construction Engineering and Management, 130(5), pp. 708-718. ISSN 0733-9364
Sesoko, M P (2000) Gender and development in the construction industry in South Africa: A study of partnerships as alternative solution for women. PhD thesis, Brandeis University, Heller School for Social Policy and Management, USA.
Sfakianakis, E and van de Laar, M (2013) Fiscal effects and public risk in public-private partnerships. Built Environment Project and Asset Management, 3(2), pp. 181-198. ISSN 2044-124X
Shabbir, A (2015) Corruption in infrastructure procurement: a study based on procurement of infrastructure projects in Pakistan. PhD thesis, University of Manchester, UK.
Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization. PhD thesis, University of Maryland, College Park, USA.
Shah, M A; Kumar, S; Shah, M A and Rasool, A (2024) Examining the relationship among critical success factors (CSFs) for delivery of sustainable public-private partnership projects. Journal of Financial Management of Property and Construction, 29(2), pp. 250-273. ISSN 1366-4387
Shakeri, E (2002) An investigation of privately promoted infrastructure (ppi) strategy in developing countries: Public-private partnership (ppp) approach. PhD thesis, University of Manchester, UK.
Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(6), pp. 1004-1023. ISSN 0969-9988
Shan, L; Garvin, M J and Kumar, R (2010) Collar options to manage revenue risks in real toll public-private partnership transportation projects. Construction Management and Economics, 28(10), pp. 1057-1069. ISSN 1466433X
Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms. PhD thesis, University of Washington, USA.
Shang, L and Abdel Aziz, A M (2020) Stackelberg game theory-based optimization model for design of payment mechanism in performance-based PPPs. Journal of Construction Engineering and Management, 146(4): 04020029, ISSN 0733-9364
Shang, M; Zhang, Y; He, Z; Qiao, H; Liu, X; Feng, Q; Xue, C; Zhang, Y; Su, F; Wang, J; Han, Y and Meng, X (2023) Workability properties of specified density concrete with municipal solid waste incinerator tailings added as a lightweight aggregate. Journal of Construction Engineering and Management, 149(8): 04023058, ISSN 0733-9364
Shankar, R and Tan, W (2024) Bid variability in public-private partnerships: Lessons from asset monetization through the toll-operate-transfer model in India. Journal of Construction Engineering and Management, 150(12): 05024015, ISSN 0733-9364
Shanmugapriya, S (2016) Structural equation modelling to investigate the factors influencing quality safety and productivity in construction projects. PhD thesis, Anna University, Chennai, India.
Sharafi, A; Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(2), pp. 87-103. ISSN 01446193
Sharafi, A; Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of financial conflicts in the operation phase of public-private partnership contracts. Journal of Construction Engineering and Management, 147(6): 78622011, ISSN 0733-9364
Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships. PhD thesis, University of Maryland, College Park, USA.
Sharma, M (2014) Architectural design quality in local authority private finance initiative sheltered housing projects: the development of an evaluation tool. PhD thesis, Northumbria University, UK.
Shen, W; Zhai, X; Wan, L and Ren, X (2026) Unlocking internationalization success in construction: A configurational analysis of firm strategies and market dynamics. Journal of Construction Engineering and Management, 152(2): 04025249, ISSN 0733-9364
Shen, W; Liu, Y; Tang, W; Wang, S; Duffield, C F; Hui, F K P and Zhang, L (2024) Configuring success: Unveiling key configurations for enhanced design coordination in hydropower projects. Journal of Construction Engineering and Management, 150(12): 04024173, ISSN 0733-9364
Shen, W; Tang, W; Wang, Y; Duffield, C F; Hui, F K P and Zhang, L (2021) Managing interfaces in large-scale projects: The roles of formal governance and partnering. Journal of Construction Engineering and Management, 147(7): 04021064, ISSN 0733-9364
Sheng, X (2018) Public-private partnership in the development of infrastructure under the 'Belt and Road' initiative. PhD thesis, University of Oxford, UK.
Sherratt, F and Ivory, C (2019) Managing "a little bit unsafe": Complexity, construction safety and situational self-organising. Engineering, Construction and Architectural Management, 26(11), pp. 2519-2534. ISSN 0969-9988
Sherratt, F and Sherratt, S (2018) PPP problems: Challenging academic compliance with economic opportunism and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Sherratt, F; Sherratt, S and Ivory, C (2020) Challenging complacency in construction management research: The case of PPPs. Construction Management and Economics, 38(12), pp. 1086-1100. ISSN 01446193
Shi, X.; Ke, Y.; Wu, X.; Gong, X. and Zhang, J. (2026) How performance-based are China's public-private partnership road projects? A KPI framework and scoring method. Built Environment Project and Asset Management, 14, pp. 1-21. ISSN 2044-124X
Shi, L; He, Y and Onishi, M (2023) Effect of the internal agency problem on risk-sharing incentive contracts in public-private partnership projects. Journal of Construction Engineering and Management, 149(12): 04023126, ISSN 0733-9364
Shi, L; Wang, Y and Onishi, M (2024) Tie-formation mechanisms in evolving networks of sponsors in highway public-private partnerships. Journal of Construction Engineering and Management, 150(10): 04024128, ISSN 0733-9364
Shields, R and West, K (2003) Innovation in clean-room construction: A case study of co-operation between firms. Construction Management and Economics, 21(4), pp. 337-344. ISSN 01446193
Shipton, C (2012) Understanding post-contract changes in partnering projects: An ethnographic approach. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Shohet, I M; Wei, H H; Skibniewski, M J; Tak, B and Revivi, M (2019) Integrated communication, control, and command of construction safety and quality. Journal of Construction Engineering and Management, 145(9): 04019051, ISSN 0733-9364
Shrestha, A; Chan, T K; Aibinu, A A; Chen, C and Martek, I (2017) Risks in PPP water projects in China: Perspective of local governments. Journal of Construction Engineering and Management, 143(7): 05017006, ISSN 0733-9364
Shrestha, A; Chan, T K; Aibinu, A A; Chen, C and Martek, I (2018) Risk allocation inefficiencies in Chinese PPP water projects. Journal of Construction Engineering and Management, 144(4): 04018013, ISSN 0733-9364
Shrestha, B (2024) Assessment of success factors and comparative analysis of public private partnership (P3) project performances against design-build and design-bid-build project delivery. PhD thesis, University of Nevada, Las Vegas, USA.
Shuaib, Salem Mohammed S (2016) Project management performance in Saudi Arabia: An exploratory study into the constructs that most influence project success. PhD thesis, University of Adelaide, Australia.
Siew, R Y J (2015) Alternative framework for assessing sustainable building funds: Green building fund. Building Research & Information, 43(2), pp. 160-169. ISSN 0961-3218
Silva, A; Neves, L C; Gaspar, P L and de Brito, J (2016) Probabilistic transition of condition: Render facades. Building Research & Information, 44(3), pp. 301-318. ISSN 0961-3218
Simon, L; Jefferies, M; Davis, P and Newaz, M T (2020) Developing a theoretical success factor framework for the tendering phase of social infrastructure PPPs. International Journal of Construction Management, 20(6), pp. 613-627. ISSN 1562-3599
Simpson, E; Gilmour, D; Blackwood, D; Falconer, R and Isaacs, J (2015) Major project team learning: Examining building information modelling. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Sinesilassie, E G; Tripathi, K K; Tabish, S Z S and Jha, K N (2019) Modeling success factors for public construction projects with the SEM approach: Engineer's perspective. Engineering, Construction and Architectural Management, 26(10), pp. 2410-2431. ISSN 0969-9988
Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 0969-9988
Skaik, S and Oweineh, H (2014) Assessing the practice of project-based jv between local and international contractors in the UAE. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Slater, K R; Ventura, J; Robinson, J B; Fernandez, C; Dutfield, S and King, L (2022) Assessing climate action progress of the city of Toronto. Buildings & Cities, 3(1), pp. 1059-1074. ISSN 2632-6655
Slaughter, E S (1991) "Rapid" innovation and integration of components: Comparison of user and manufacturer innovations through a study of residential construction. PhD thesis, Massachusetts Institute of Technology, USA.
Smallwood, J (1998) Client influence on contractor health and safety in South Africa. Building Research & Information, 26(3), pp. 181-189. ISSN 0961-3218
Smallwood, J (2007) The influence of architectural designers on construction ergonomics. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.
Smith, N J and Gannon, M (2008) Political risk in light rail transit PPP projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 179-185. ISSN 17514312
So, K L (2021) Integrated life-cycle management of highway bridges. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Soetanto, R (2002) Modelling satisfaction for main participants of the construction project coalition: a study of mutual performance assessment. PhD thesis, University of Wolverhampton, UK.
Soh, C C and Ong, S E (1999) Motivation and risk perception in foreign and domestic real estate investments. Journal of Financial Management of Property and Construction, 4(3), pp. 47-64. ISSN 1366-4387
Sohail, M and Maslyukivska, O (2009) Learning from water sector reforms in Europe and Asia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(3), pp. 107-116. ISSN 17514312
Solheim-Kile, E and Wald, A (2019) Extending the transactional view on public-private partnership projects: Role of relational and motivational aspects in goal alignment. Journal of Construction Engineering and Management, 145(5): 04019030, ISSN 0733-9364
Son, J; O'Brien, W J and Thomas, S R (2022) Recommended practices for effective management of academia-industry collaborative research teams in construction management. Journal of Construction Engineering and Management, 148(8): 04022075, ISSN 0733-9364
Song, D; Song, J; Yuan, H and Fan, Y (2021) An evolutionary game analysis of user-pay public-private partnership projects. Engineering, Construction and Architectural Management, 28(7), pp. 2042-2062. ISSN 0969-9988
Soomro, M A (2013) Failure mechanisms in transportation public private partnerships. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Soon, C D (2009) Managing risk and uncertainty in transportation megaprojects. PhD thesis, University of Hawai'i at Manoa, USA.
South, A J (2019) Stakeholder network dynamics and the governance of public-private partnerships. PhD thesis, Stanford University, USA.
Sowder, Anne Marie (2023) Framework for recovery: The 1935 hurricane houses of islamorada as a case of successful post-disaster rebuilding. PhD thesis, University of Florida, USA.
Sparkling, A E (2018) Collaborative project delivery practices, goal alignment, and performance in architecture, engineering, and construction project teams. PhD thesis, Michigan State University, USA.
Squires, G; Hutchison, N; Adair, A; Berry, J; McGreal, S and Organ, S (2016) Innovative real estate development finance: evidence from Europe. Journal of Financial Management of Property and Construction, 21(1), pp. 54-72. ISSN 1366-4387
Sridharan, G (1995) Determinants of joint venture performance in the construction industry: Cases from the mass rapid transit project of Singapore. PhD thesis, University of London, UK.
Sridharan, G (1995) Determinants of joint venture performance in the construction industry: cases from the mass rapid transit project of Singapore. PhD thesis, University College London, UK.
Staykova, G and Underwood, J (2017) Assessing collaborative performance on construction projects through knowledge exchange: A UK rail strategic alliance case study. Engineering, Construction and Architectural Management, 24(6), pp. 968-987. ISSN 0969-9988
Stewart, P (2001) The role of e-commerce systems for the construction industry. Construction Economics and Building, 1(2), pp. 24-36. ISSN 2204-9029
Stipanowich, T J (1997) At the cutting edge: Conflict avoidance and resolution in the US construction industry. Construction Management and Economics, 15(6), pp. 505-512. ISSN 01446193
Stocks, S N and Singh, A (1999) Studies on the impact of functional analysis concept design on reduction in change orders. Construction Management and Economics, 17(3), pp. 251-267. ISSN 01446193
Straub, A D (2010) Competences of maintenance service suppliers servicing end-customers. Construction Management and Economics, 28(11), pp. 1187-1195. ISSN 1466433X
Sturup, Anna Sophie (2010) Managing mentalities of mega projects: The art of government of mega urban transport project. PhD thesis, University of Melbourne, Australia.
Sugrue, D P (2021) Alternative financing for harbor infrastructure using big data analytics in the great lakes waterway. PhD thesis, University of Michigan, USA.
Sulaiman, K (2008) A study of building procurement process as a potential tool to enhance safety practice in the construction industry. PhD thesis, University of Salford, UK.
Sultan, Mohamed (2025) PPP contracts for healthcare facilities in Canada: Qualitative study to identify lessons learned. PhD thesis, Arizona State University, USA.
Sumanarathna, N and Rowlinson, R (2019) Examining construction contractors' innovation through the lens of exploration and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Sun, Y; Wang, L; Zhao, Y and Tiong, R L K (2026) Appraising institutional quality drivers of private capital participation in public–private partnership by dynamic qualitative comparative analysis. International Journal of Construction Management, 26(6), pp. 1078-1096. ISSN 1562-3599
Sun, G; Sun, J and Li, F (2022) Influencing factors of early termination for PPP projects based on multicase grounded theory. Journal of Construction Engineering and Management, 148(11): 04022120, ISSN 0733-9364
Sundaraj, G and Eaton, D (2013) Quantifying robustness in PFIs. Journal of Financial Management of Property and Construction, 18(1), pp. 26-52. ISSN 1366-4387
Sundararajan, S K and Tseng, C L (2017) Managing project performance risks under uncertainty: Using a dynamic capital structure approach in infrastructure project financing. Journal of Construction Engineering and Management, 143(8): 04017046, ISSN 0733-9364
Sundquist, V; Hulthén, K and Gadde, L E (2018) From project partnering towards strategic supplier partnering. Engineering, Construction and Architectural Management, 25(3), pp. 358-373. ISSN 0969-9988
Suo, W.; Li, J.; Zhang, J. and Wang, L. (2026) A feature-driven risk allocation modeling methodology for transport infrastructure public-private partnership projects. Journal of Construction Engineering and Management, 152(10): 04026174, ISSN 0733-9364
Susanti, B; Kadarsa, E; Foralisa, M and Juliantina, I (2023) Non-toll revenue potential to increase funding sources for toll road maintenance. Construction Economics and Building, 23(3-4), pp. 170-185. ISSN 2204-9029
Sutrisna, M; Ramanayaka, C D D and Goulding, J S (2018) Developing work breakdown structure matrix for managing offsite construction projects. Architectural Engineering and Design Management, 14(5), pp. 381-397. ISSN 1745-2007
Sutrisna, M; Tjia, D and Wu, P (2021) Developing a predictive model of construction industry-university research collaboration. Construction Innovation, 21(4), pp. 761-781. ISSN 1471-4175
Svec, P; Berkebile, R and Todd, J A (2012) REGEN: Toward a tool for regenerative thinking. Building Research & Information, 40(1), pp. 81-94. ISSN 0961-3218
Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(2), pp. 132-148. ISSN 0969-9988
Swan, W and Khalfan, M M A (2007) Mutual objective setting for partnering projects in the public sector. Engineering, Construction and Architectural Management, 14(2), pp. 119-130. ISSN 0969-9988
Sward, A (2006) Relations as a key resource. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Sze, E; Kumaraswamy, M; Fung, A; Palaneeswaran, E and Wong, S (2004) Partnering with the tenants- Hong Kong experience. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Sözen, Z and Kayahan, O (2001) Correlates of the length of the relationship between main and specialist trade contractors in the construction industry. Construction Management and Economics, 19(2), pp. 131-133. ISSN 01446193
Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Tan, W (2009) Restructuring public-private partnership in student housing. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 83-88. ISSN 17514312
Tan, W and Dong, X (2010) Institutional innovation and financing infrastructure in Xi'an. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 143-149. ISSN 17514312
Tan, Y; Xue, B and Cheung, Y T (2017) Relationships between main contractors and subcontractors and their impacts on main contractor competitiveness: An empirical study in Hong Kong. Journal of Construction Engineering and Management, 143(7): 05017007, ISSN 0733-9364
Tanabe, S (2022) A risk allocation framework for public private partnerships (PPP) water infrastructure projects in Sri Lanka. PhD thesis, University of the West of England, Bristol, UK.
Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Tang, W; Duffield, C F and Young, D M (2006) Partnering mechanism in construction: An empirical study on the Chinese construction industry. Journal of Construction Engineering and Management, 132(3), pp. 217-229. ISSN 0733-9364
Tang, W; Qiang, M; Duffield, C F; Young, D M and Lu, Y (2007) Risk management in the Chinese construction industry. Journal of Construction Engineering and Management, 133(12), pp. 944-956. ISSN 0733-9364
Tang, W; Qiang, M; Duffield, C F; Young, D M and Lu, Y (2008) Incentives in the Chinese construction industry. Journal of Construction Engineering and Management, 134(7), pp. 457-467. ISSN 0733-9364
Tang, Y; Wang, G; Li, H and Cao, D (2018) Dynamics of collaborative networks between contractors and subcontractors in the construction industry: Evidence from national quality award projects in China. Journal of Construction Engineering and Management, 144(9): 05018009, ISSN 0733-9364
Tangkitsiri, W (2016) Modelling user satisfaction with transportation public-private partnership projects. PhD thesis, Heriot-Watt University, UK.
Tariq, S and Zhang, X (2021) Critical analysis of the private sector roles in water PPP failures. Journal of Construction Engineering and Management, 147(4): 04021015, ISSN 0733-9364
Tariq, S and Zhang, X (2022) A critical analysis of water PPP failures in Sub-Saharan Africa. Engineering, Construction and Architectural Management, 29(8), pp. 3157-3180. ISSN 0969-9988
Tariq, S; Zhang, X and Leung, R H M (2019) An analytical review of failed water public-private partnerships in developing countries. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(2), pp. 60-69. ISSN 17514304
Tasselli, Nicola (2023) BIM digital integration for existing buildings: Processes and tools to foster technological innovation of added-value building systems applied to the 20th century built asset in emilia-romagna. PhD thesis, Università degli Studi di Ferrara, Italy.
Tawalare, A and Laishram, B (2018) Relational contracting conceptual model for public sector construction organisations: An Indian context. Construction Economics and Building, 18(2), pp. 70-91. ISSN 2204-9029
Tawalare, A and Laishram, B (2020) Factors hindering effective partnering in Indian public sector construction organizations. Journal of Financial Management of Property and Construction, 25(1), pp. 83-105. ISSN 1366-4387
Tawalare, A; Laishram, B and Thottathil, F (2020) Relational partnership in public construction organizations: Front-line employee perspective. Journal of Construction Engineering and Management, 146(1): 04019086, ISSN 0733-9364
Tawfiq, O H (2007) Doing contracting differently. PhD thesis, University of Bristol, UK.
Tchorly, J T (2020) The development of a bidding and award process map for road PPP projects in Ghana. PhD thesis, University of Salford, UK.
Teale, Allan F (2022) The relationship between transparency, public private partnerships and delivery outcomes in major transport infrastructure. PhD thesis, University of Technology Sydney, Australia.
Teebken, J (2024) Disrupt and unlock? The role of actors in urban adaptation path-breaking. Buildings & Cities, 5(1), pp. 162-181. ISSN 2632-6655
Tennant, S and Fernie, S (2014) Theory to practice: A typology of supply chain management in construction. International Journal of Construction Management, 14(1), pp. 56-66. ISSN 1562-3599
Teo, E A L; Chan, S L and Tan, P H (2007) Empirical investigation into factors affecting exporting construction services in SMEs in Singapore. Journal of Construction Engineering and Management, 133(8), pp. 582-591. ISSN 0733-9364
Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.
Teo, P L; Bridge, A J; Gray, J and Jefferies, M C (2011) Developing a research method to test a new first-order decision making model for the procurement of public sector major infrastructure. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Tepeli, E; Taillandier, F and Breysse, D (2021) Multidimensional modelling of complex and strategic construction projects for a more effective risk management. International Journal of Construction Management, 21(12), pp. 1218-1239. ISSN 1562-3599
Terouhid, S A (2013) A dynamic decision support system for organizational sustainability excellence of construction firms. PhD thesis, University of Florida, USA.
Thakore, A Y; Iyer, M; Mishra, G and Doshi, S (2024) Resilient WASH development for urban poor: The case of Ahmedabad slums. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 19-44. ISSN 1759-5916
Tharun, T; Thounaojam, N; Devkar, G and Laishram, B (2025) Proactive contract theory-based resilience framework development for public-private partnerships. Construction Economics and Building, 25(2), pp. 253-275. ISSN 2204-9029
Thennakoon, P. N.; Jayasena, S.; Rathnasinghe, A. P. and Ekanayake, A. (2025) Regulatory framework for unsolicited PPPs in infrastructure developments: Barriers and strategies. Construction Innovation, 26(5), pp. 1443-1468. ISSN 1471-4175
Thneibat, M; Thneibat, M and Al-Tamimi, B (2022) Establishing the synergy between the perceptions of construction professionals and the phases of value management. Engineering, Construction and Architectural Management, 29(4), pp. 1835-1860. ISSN 0969-9988
Thomson, C S; El-Haram, M A and Emmanuel, R (2009) Mapping knowledge during sustainability assessment within a PPP school project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Thomson, C S and Munns, A K (2004) Successfully implementing system innovations within the construction project environment. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Thorpe, A; Dainty, A R J and Hatfield, H (2003) The realities of being preferred: Specialist subcontractor perspectives on restricted tender list membership. Journal of Construction Procurement, 9(1), pp. 47-55. ISSN 1358-9180
Thuesen, C (2013) Pride and prejudice: Identity and collaboration in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Thuesen, C; Jensen, J S and Gottlieb, S C (2009) Making the long tail work: Reflections on the development of the construction industry the past 25 years. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Thuesen, C and Koch, C (2003) Coordinating knowledge in building design. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Thurairajah, N (2013) Leadership practices to address cultural and behavioural challenges in construction partnering projects. PhD thesis, University of Salford, UK.
Tian, B; Fu, J; Xu, Y and Sun, L (2024) How does contract flexibility affect the sustainability performance of public–private partnership projects? A serial multiple mediator model. Engineering, Construction and Architectural Management, 31(1), pp. 28-47. ISSN 0969-9988
Tian, B; Wang, Z; Li, C and Fu, J (2023) Can relational governance improve sustainability in public-private partnership infrastructure projects? An empirical study based on structural equation modeling. Engineering, Construction and Architectural Management, 30(1), pp. 19-40. ISSN 0969-9988
Tijhuis, W (2015) Managing public-private partnerships: Dealing with business-culture influences. Built Environment Project and Asset Management, 5(1), pp. 22-34. ISSN 2044-124X
Tilde, A (2023) An investigation of energy saving behaviour for residential buildings in Nigeria. PhD thesis, University of Salford, UK.
Tiong, R L; Yeo, K T and McCarthy, S C (1992) Critical success factors in winning BOT contracts. Journal of Construction Engineering and Management, 118(2), pp. 217-228. ISSN 0733-9364
Tiong, R L K (1996) CSFs in competitive tendering and negotiation model for BOT projects. Journal of Construction Engineering and Management, 122(3), pp. 205-211. ISSN 0733-9364
Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(2), pp. 83-94. ISSN 0969-9988
To, W M and Lam, K H (2022) Green project management from employees' perspective in Hong Kong's engineering and construction sectors. Engineering, Construction and Architectural Management, 29(4), pp. 1890-1907. ISSN 0969-9988
Tobin, A G V (2009) Conflict-resolution competencies for the construction professional. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 181-184. ISSN 17514312
Toke, L K and Kalpande, S D (2022) Strategic planning to investigate the decision index of organization for effective total quality management implementation: in context of Indian small and medium enterprises. Journal of Engineering, Design and Technology, 20(3), pp. 749-776. ISSN 1726-0531
Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.
Toma, H M; El-Sayed, S; Ibrahim, A H and Badawy, M (2025) Hybrid Evaluation Model to assess the overall barriers of public-private partnership contracts. International Journal of Construction Management, 25(7), pp. 750-759. ISSN 1562-3599
Tong, M K L (2011) The management of inter-organisational relationships and project based learning. PhD thesis, Glasgow Caledonian University, UK.
Tong, M K L; Akintoye, A; Kelly, J and Tookey, J (2003) Understanding construction supply chain relationships: An aetiological approach. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking. PhD thesis, Luleå University of Technology, Sweden.
Toor, S U R and Ogunlana, S (2009) Ineffective leadership: Investigating the negative attributes of leaders and organizational neutralizers. Engineering, Construction and Architectural Management, 16(3), pp. 254-272. ISSN 0969-9988
Toriola-Coker, L O; Alaka, H; Agbali, M; Bello, W A; Pathirage, C and Oyedele, L (2022) Marginalization of end-user stakeholder's in public private partnership road projects in Nigeria. International Journal of Construction Management, 22(11), pp. 2098-2107. ISSN 1562-3599
Trangkanont, S and Charoenngam, C (2014) Critical failure factors of public-private partnership low-cost housing program in Thailand. Engineering, Construction and Architectural Management, 21(4), pp. 421-443. ISSN 0969-9988
Trethewy, Ross (2002) Influences on subcontractor OHS management outcomes in construction. PhD thesis, University of New South Wales, Australia.
Tryggestad, K; Hugosson, M and Søberg, P (2018) Managing risk and uncertainty in sustainable construction innovation: The role of the partnering contract. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Tsai, I T (2007) Default and renegotiation: Financial structure and incentive in public-private partnership contracts. PhD thesis, Massachusetts Institute of Technology, USA.
Tserng, H P; Russell, J S; Hsu, C W and Lin, C (2012) Analyzing the role of national PPP units in promoting PPPs: Using new institutional economics and a case study. Journal of Construction Engineering and Management, 138(2), pp. 242-249. ISSN 0733-9364
Turner, M and Simmons, D R (2020) Taking a partnered approach to managing academic stress: An undergraduate study. International Journal of Construction Education and Research, 16(4), pp. 251-269. ISSN 1557-8771
Turrell, P (2001) Making the link between teaching and research and consultancy. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Tzortzatou, E P (2008) Culture impact in construction supply chain management. PhD thesis, University College London, UK.
Uher, T E (1999) Partnering performance in Australia. Journal of Construction Procurement, 5(2), pp. 163-176. ISSN 1358-9180
Ullah, F; Ayub, B; Siddiqui, S Q and Thaheem, M J (2016) A review of public-private partnership: Critical factors of concession period. Journal of Financial Management of Property and Construction, 21(3), pp. 269-300. ISSN 1366-4387
Ullah, F and Thaheem, M J (2018) Concession period of public private partnership projects: Industry-academia gap analysis. International Journal of Construction Management, 18(5), pp. 418-429. ISSN 1562-3599
Umar, A A; Zawawi, N A W A and Abdul Aziz, A R (2024) Do regional characteristics influence PPP contract governance skills requirements? Engineering, Construction and Architectural Management, 31(10), pp. 4146-4161. ISSN 0969-9988
Umar, A A; Zawawi, N A W A and Abdul-Aziz, A R (2019) Exploratory factor analysis of skills requirement for PPP contract governance. Built Environment Project and Asset Management, 9(2), pp. 277-290. ISSN 2044-124X
Underwood, J and Watson, A (2003) An XML metadata approach to seamless project information exchange between heterogeneous platforms. Engineering, Construction and Architectural Management, 10(2), pp. 128-145. ISSN 0969-9988
Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks. PhD thesis, Columbia University, USA.
Unsal, H I and Taylor, J E (2011) Modeling interfirm dependency: Game theoretic simulation to examine the holdup problem in project networks. Journal of Construction Engineering and Management, 137(4), pp. 284-293. ISSN 0733-9364
Usher, D (1990) Privatisation, partnerships and the building industry. PhD thesis, University of Bristol, UK.
Usman, Z S (2023) Using Semantic Web technologies to recommend sustainable building technology products. PhD thesis, Oxford Brookes University, UK.
Ustadi, A M A (2013) The prospects of introducing the private finance initiative in the UAE construction industry. PhD thesis, British University in Dubai, UAE.
Vahanvati, M; McEvoy, D and Iyer-Raniga, U (2023) Inclusive and resilient shelter guide: Accounting for the needs of informal settlements in Solomon Islands. International Journal of Disaster Resilience in the Built Environment, 14(4), pp. 577-590. ISSN 1759-5916
Vahdatmanesh, M; Firouzi, A and Rotimi, J O B (2022) Real options analysis of revenue risk sharing in post-disaster housing reconstruction. Journal of Financial Management of Property and Construction, 27(3), pp. 281-305. ISSN 1366-4387
Vakola, M (1999) Business process re-engineering and organisational change: Evaluation of implementation strategies. PhD thesis, University of Salford, UK.
Vale, B and Vale, R (2010) Domestic energy use, lifestyles and poe: Past lessons for current problems. Building Research & Information, 38(5), pp. 578-588. ISSN 0961-3218
Valero-Silva, N and Jones, A (2011) An evaluation of the customer satisfaction monitoring system in a decent homes programme. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Van Buiten, M and Hartmann, A (2015) Asset management perspective on the duration of public-private partnership contracts: Cost-control trade-off? Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Venselaar, M and Gruis, V (2016) Studying intra-organizational dynamics in implementing supply chain partnering: A case study about work floor experiences in a Dutch housing association. Construction Management and Economics, 34(2), pp. 98-109. ISSN 01446193
Venselaar, M and Wamelink, H (2017) The nature of qualitative construction partnering research: Literature review. Engineering, Construction and Architectural Management, 24(6), pp. 1092-1118. ISSN 0969-9988
Venselaar, Marieke (2017) Work floor experiences of supply chain partnering in the Dutch housing sector. PhD thesis, Delft University of Technology, Netherlands.
Verma, M (2012) Public private partnerships in road transport infrastructure in India: A governance perspective. PhD thesis, University of Manchester, UK.
Vermeer, D M M (2019) Collective learning in strategic public private partnership procurement systems for social infrastructure. PhD thesis, University of London, University College London, UK.
Vermeer, Daniel Marinus Maria (2019) Collective learning in strategic public private partnership (PPP) procurement systems for social infrastructure. PhD thesis, University College London, UK.
Vine, R (2018) The intelligent client: learning to govern through numbers at Heathrow. PhD thesis, University of Sussex, UK.
Voelker, C; Permana, A; Sachs, T and Tiong, R (2008) Political risk perception in Indonesian power projects. Journal of Financial Management of Property and Construction, 13(1), pp. 18-34. ISSN 1366-4387
Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(6), pp. 648-673. ISSN 0969-9988
Walker, D and Lloyd-Walker, B (2011) Knowledge, skills and attributes of project alliances managers in Australasia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Walker, D H T and Johannes, D (2001) Organizational learning intentions and joint ventures in Hong Kong infrastructure projects: A pilot study. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Wamuziri, S (2023) Legislative framework for public-private partnerships in the Sultanate of Oman. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 150-156. ISSN 17514304
Wamuziri, S and Jiang, M (2008) Role of export credit agencies in PFI/PPP projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 163-169. ISSN 17514312
Wamuziri, S and Madan, S (2009) Improvement and innovation through collaborative partnerships. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 17-27. ISSN 17514312
Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wang, B; Cui, Q and Zhang, S (2021) Noncompete provision design for transportation PPP projects. Journal of Construction Engineering and Management, 147(2): 04020159, ISSN 0733-9364
Wang, B; Zhang, S; Wang, X and Feng, Z (2018) The influence of quality benefit and marginal contribution on the optimal equity structure of the PPP projects: Balancing public and private benefits. Construction Management and Economics, 36(11), pp. 611-622. ISSN 01446193
Wang, C; Liu, H; Sing, M C P and Wu, J (2024) Pre-construction duration of public-private partnership projects: Evidence from China. Engineering, Construction and Architectural Management, 31(4), pp. 1715-1729. ISSN 0969-9988
Wang, D; Wang, X; Liu, M; Liu, H and Liu, B (2021) Managing public-private partnerships: A transmission pattern of underlying dynamics determining project performance. Engineering, Construction and Architectural Management, 28(4), pp. 1038-1059. ISSN 0969-9988
Wang, D; Wang, X; Wang, L; Liu, H; Sing, M and Liu, B (2023) Optimisation of government subsidies in infrastructure public-private partnerships. Journal of Engineering, Design and Technology, 21(5), pp. 1280-1302. ISSN 1726-0531
Wang, H; Hamilton, A; Song, Y and Tah, J (2007) Implementation of a data integration service for building and urban planning. Architectural Engineering and Design Management, 3(3), pp. 195-208. ISSN 1745-2007
Wang, J; Liang, M and Liao, P C (2024) Toward an intuitive device for construction hazard recognition management: Eye fixation-related potentials in reinvestigation of hazard recognition performance prediction. Journal of Construction Engineering and Management, 150(5): 04024028, ISSN 0733-9364
Wang, K (2017) Real options models for better investment decisions in road infrastructure under demand uncertainty. PhD thesis, University of California, Irvine, USA.
Wang, K; Ke, Y; Liu, T and Sankaran, S (2022) Social sustainability in public-private partnership projects: Case study of the Northern beaches hospital in sydney. Engineering, Construction and Architectural Management, 29(6), pp. 2437-2460. ISSN 0969-9988
Wang, L; Tao, M; An, X; Dong, G; Huang, Y and Wang, H (2025) Regulatory strategies of water environment treatment PPP projects operation. Engineering, Construction and Architectural Management, 32(2), pp. 1303-1329. ISSN 0969-9988
Wang, L; Zhang, P; Zhang, P; Li, R; Zhang, Y and Wu, Y (2018) A systematic approach for public-private partnership projects CSFs evaluation. Engineering, Construction and Architectural Management, 25(9), pp. 1127-1145. ISSN 0969-9988
Wang, N; Wang, H and Zhang, K (2022) The dynamics of changes in PPP projects: A meta-case analysis approach. Construction Management and Economics, 40(9), pp. 727-742. ISSN 01446193
Wang, S; Tang, W and Li, Y (2013) Relationship between owners' capabilities and project performance on development of hydropower projects in China. Journal of Construction Engineering and Management, 139(9), pp. 1168-1178. ISSN 0733-9364
Wang, T; Tang, W; Qi, D; Shen, W and Huang, M (2016) Enhancing design management by partnering in delivery of international EPC projects: Evidence from Chinese construction companies. Journal of Construction Engineering and Management, 142(4): 04015099, ISSN 0733-9364
Wang, X (2022) Enabling human-robot partnerships in digitally-driven construction work through integration of building information models, interactive virtual reality, and process-level digital twins. PhD thesis, University of Michigan, USA.
Wang, X; Tang, L; Guo, S and Gao, Y (2025) Configurations of factors affecting the equity structure in PPP projects: A resource-dependent perspective. Construction Management and Economics, 43(7), pp. 483-501. ISSN 0144-6193
Wang, X; Wang, B; Xu, Y and Shi, L (2021) A chance constrained programming method to determine optimal capital structure for privatized infrastructure. Construction Management and Economics, 39(7), pp. 579-594. ISSN 01446193
Wang, X; Wang, S and Gao, Y (2023) Optimal equity structure of PPP projects when private-sector shareholders' "investor-contractor" dual roles is considered. Construction Management and Economics, 41(11-12), pp. 910-925. ISSN 01446193
Wang, X; Yin, Y and Xu, Z (2022) The influence of trust networks on public–private partnership project performance. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 65-74. ISSN 17514304
Wang, Y (2024) Towards automated contract analysis: Applying language models to risk identification in the context of public-private partnerships. PhD thesis, University of Maryland, College Park, USA.
Wang, Y; Chen, L and Zhuang, J (2023) Pricing of credit default swaps from the perspective of credit enhancement in PPP projects. Journal of Construction Engineering and Management, 149(6): 05023006, ISSN 0733-9364
Wang, Y; Shao, Z and Tiong, R L K (2021) Data-driven prediction of contract failure of public-private partnership projects. Journal of Construction Engineering and Management, 147(8): 0002124, ISSN 0733-9364
Wang, Z; Zhou, Y; Jin, X; Zhao, N and Sun, J (2023) Risk allocation and benefit distribution of PPP projects for construction waste recycling: A case study of China. Engineering, Construction and Architectural Management, 30(9), pp. 3927-3956. ISSN 0969-9988
Waterhouse, M and McCabe, S (1999) A critical examination of the concept of 'best practice'. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Watts, N; Watson, P A and Griffith, A (1999) Building procurement: The partnering paradigm. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Watts, N; Watson, P A and Griffith, A (2000) The role of project managers in partnering arrangements. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Weerasooriya, D; Perera, B A K S; Ranadewa, K A T O and Gallage, S D (2025) Scrutinizing the shift: investigating quantity surveyors' adaptability to cyber-physical systems. International Journal of Construction Management, 25(2), pp. 139-148. ISSN 1562-3599
Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531
Wei, Yi (2007) Factors influencing the success of virtual cooperation within Dutch-Chinese strategic alliances. PhD thesis, University of Twente, Netherlands.
Weigend Rodríguez, R; Pomponi, F; Webster, K and D'Amico, B (2020) The future of the circular economy and the circular economy of the future. Built Environment Project and Asset Management, 10(4), pp. 529-546. ISSN 2044-124X
Weisheng, L; Liu, A M M; Hongdi, W and Zhongbing, W (2013) Procurement innovation for public construction projects: A study of agent-construction system and public-private partnership in China. Engineering, Construction and Architectural Management, 20(6), pp. 543-562. ISSN 0969-9988
Weldu, Y W (2016) Automated generation and visualization of initial construction schedules from building information models. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Werna, E (2006) The construction action programme of the international labour office: A view of on-going implementation and implications for research. Journal of Construction in Developing Countries, 11(1), pp. 53-72. ISSN 1823-6499
Wessels, M (2014) Stimulating sustainable infrastructure development through public-private partnerships. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 232-241. ISSN 17514304
West, J (2014) Collaborative patterns and power imbalance in strategic alliance networks. Journal of Construction Engineering and Management, 140(6): 4014010, ISSN 0733-9364
Weththasinghe, K K and Wong, P S P (2023) Towards developing partnership models for leveraging design for manufacture and assembly for school buildings. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 75-90. ISSN 17514304
White, A (2020) Operational performance and delivery structure of hospital facilities: empirical relationship analyses in Ontario, Canada. DBA thesis, University of Manchester, UK.
Whittaker, S and Jespersen, K (2022) Stretching or conforming? Financing urban climate change adaptation in Copenhagen. Buildings & Cities, 3(1), pp. 974-999. ISSN 2632-6655
Whyte, J and Lobo, S (2010) Coordination and control in project-based work: Digital objects and infrastructures for delivery. Construction Management and Economics, 28(6), pp. 557-567. ISSN 1466433X
Wibowo, A (2024) Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects. Built Environment Project and Asset Management, 14(2), pp. 228-243. ISSN 2044-124X
Wibowo, A and Alfen, H W (2013) Fine-tuning the value and cost of capital of risky PPP infrastructure projects. Engineering, Construction and Architectural Management, 20(4), pp. 406-419. ISSN 0969-9988
Wibowo, A and Alfen, H W (2015) Government-led critical success factors in PPP infrastructure development. Built Environment Project and Asset Management, 5(1), pp. 121-134. ISSN 2044-124X
Wibowo, A and Hartiati, D (2023) Value-for-money drivers in public-private partnerships in affordable housing in Indonesia: An analytic network process perspective. Journal of Construction in Developing Countries, 28(2), pp. 101-119. ISSN 1823-6499
Wibowo, A and Kochendoerfer, B (2011) Selecting BOT/PPP infrastructure projects for government guarantee portfolio under conditions of budget and risk in the Indonesian context. Journal of Construction Engineering and Management, 137(7), pp. 512-522. ISSN 0733-9364
Wibowo, A and Sundermeier, M (2020) Developing a fuzzy value-for-money analysis model for annuity-based public-private partnership infrastructure projects under consideration of risk mitigation capability. Journal of Construction Engineering and Management, 146(7): 04020081, ISSN 0733-9364
Willcock, J and Evans, S (2003) Co-development: A case study linking work from the automotive sector with the construction industry. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Williams, J.; Ibrahim, K.; Simpeh, F. and Amoah, C. (2026) Evaluating sensing technology adaptation benefits in construction: A cross-cultural view. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 124-133. ISSN 1751-4304
Williams, A (2004) Industry engagement in uk built environment higher education courses. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Winata, L E and Gultom, Y M L (2024) The effects of governance on performance: The case of public-private partnership (PPP) toll roads in Indonesia. International Journal of Construction Management, 24(13), pp. 1398-1406. ISSN 1562-3599
Winch, G M (2000) Institutional reform in British construction: Partnering and private finance. Building Research & Information, 28(2), pp. 141-155. ISSN 0961-3218
Woksepp, S (2007) Virtual reality in construction tools, methods and processes. PhD thesis, Luleå University of Technology, Sweden.
Wolbers, M; Evans, R J E; Holmes, M; Pasquire, C L and Price, A D F (2005) Construction management and lean thinking in highways maintenance. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wong, P S P; Cheung, S O and Ho, P K M (2005) Contractor as trust initiator in construction partnering: prisoner's dilemma perspective. Journal of Construction Engineering and Management, 131(10), pp. 1045-1053. ISSN 0733-9364
Wood, G and McDermott, P (2001) Building on trust: A co-operative approach to construction procurement. Journal of Construction Procurement, 7(2), pp. 4-14. ISSN 1358-9180
Wood, G D and Ellis, R C T (2005) Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(3), pp. 317-325. ISSN 01446193
Worthing, D and Organ, S (2020) Conservation management plans: An examination of obstacles to, and opportunities for, producing an effective management tool. International Journal of Building Pathology and Adaptation, 38(4), pp. 573-588. ISSN 23984708
Wright, J A (2005) An assessment of competitive advantage and market opportunities of UK construction companies operating in Europe. PhD thesis, University of Leeds, UK.
Wu, D.; Wang, T.; Chan, P. and Gruis, V. (2026) Integration of circular economy principles into Dutch social housing procurement: Technological, organizational and environmental practices, challenges and development potentials. Smart and Sustainable Built Environment, pp. 1-21. ISSN 2046-6099
Wu, G; Zhao, X; Zuo, J and Zillante, G (2019) Effects of team diversity on project performance in construction projects. Engineering, Construction and Architectural Management, 26(3), pp. 408-423. ISSN 0969-9988
Wu, J; Liu, H J; Sing, M C P; Humphrey, R and Zhao, J (2020) Public-private partnerships: Implications from policy changes for practice in managing risks. Engineering, Construction and Architectural Management, 27(9), pp. 2253-2269. ISSN 0969-9988
Wu, S (2010) The impact of collaborative working on construction project performance. PhD thesis, Northumbria University, UK.
Wu, S; Yu, L; Cao, T; Yuan, C and Du, Y (2023) How dependence asymmetry and explicit contract shape contractor-subcontractor collaboration: A psychological perspective of fairness. Journal of Construction Engineering and Management, 149(11): 04023103, ISSN 0733-9364
Wu, W; Mayo, G; McCuen, T L; Issa, R R A and Smith, D K (2018) Building information modeling body of knowledge. II: Consensus building and use cases. Journal of Construction Engineering and Management, 144(8): 04018066, ISSN 0733-9364
Xiao, L; Mokhtar, N A and Sulaiman, M K A M (2025) Enhancing profitability and cost efficiency in China's construction industry. Construction Economics and Building, 25(3-4), pp. 1-21. ISSN 2204-9029
Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 0969-9988
Xie, J and Thomas Ng, S (2013) Multiobjective Bayesian network model for public-private partnership decision support. Journal of Construction Engineering and Management, 139(9), pp. 1069-1081. ISSN 0733-9364
Xiong, W and Zhang, X (2014) Concession renegotiation models for projects developed through public-private partnerships. Journal of Construction Engineering and Management, 140(5): 04014008, ISSN 0733-9364
Xiong, W and Zhang, X (2016) The real option value of renegotiation in public-private partnerships. Journal of Construction Engineering and Management, 142(8): 4016021, ISSN 0733-9364
Xiong, W; Zhang, X and Chen, H (2016) Early-termination compensation in public-private partnership projects. Journal of Construction Engineering and Management, 142(4): 04015098, ISSN 0733-9364
Xu, T; Bower, D A and Smith, N J (2003) Forms of collaboration for foreign contractors in China. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Xu, Y; Chan, A P C and Yeung, J F Y (2010) Developing a fuzzy risk allocation model for PPP projects in China. Journal of Construction Engineering and Management, 136(8), pp. 894-903. ISSN 0733-9364
Xu, Z; Wang, X; Xiao, Y and Yuan, J (2020) Modeling and performance evaluation of PPP projects utilizing IFC extension and enhanced matter-element method. Engineering, Construction and Architectural Management, 27(8), pp. 1763-1794. ISSN 0969-9988
Yang, S.; Xiang, P.; Wang, Y.; Zhang, X. and Qian, Y. (2026) Emphasizing cross-regional matters: Interpreting the critical risks of cross-regional mega infrastructure projects from an interactional perspective. Engineering, Construction and Architectural Management, 33(7), pp. 5540-5564. ISSN 0969-9988
Yang, J; Zhong, B; Gao, H and Wang, Y (2023) Task decomposition and service composition on an innovative blockchain-based construction service trading platform to select construction services. Journal of Construction Engineering and Management, 149(12): 04023130, ISSN 0733-9364
Yang, S; Cui, G; Abdal Noor, B and Lu, S (2022) Balance between affect and outcome control or face and behaviour control for better learning: Evidence from Chinese engineering project team. International Journal of Construction Management, 22(8), pp. 1432-1442. ISSN 1562-3599
Yang, W; Firouzi, A and Li, C Q (2023) Risk transfer in project finance loans for toll road using credit default swaps. Journal of Financial Management of Property and Construction, 28(1), pp. 1-21. ISSN 1366-4387
Yang, Y and Pan, W (2021) Automated guided vehicles in modular integrated construction: potentials and future directions. Construction Innovation, 21(1), pp. 85-104. ISSN 1471-4175
Ye, S and Tiong, R L K (2004) Public-private partnership for power projects: A case study of Hub power project. Journal of Financial Management of Property and Construction, 9(3), pp. 129-140. ISSN 1366-4387
Ye, X; Shi, S; Chong, H Y; Fu, X; Liu, L and He, Q (2018) Empirical analysis of firms' willingness to participate in infrastructure PPP projects. Journal of Construction Engineering and Management, 144(1): 04017092, ISSN 0733-9364
Yeung, F Y (2007) Developing a partnering performance index (PPI) for construction projects: A fuzzy set theory approach. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Yeung, J F Y; Chan, A P C and Chan, D W M (2008) Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(3), pp. 277-301. ISSN 1466433X
Yeung, J F Y; Chan, A P C; Chan, D W M and Li, L K (2007) Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study. Construction Management and Economics, 25(12), pp. 1219-1237. ISSN 1466433X
Yevu, S K; Owusu, E K; Chan, A P C; Oti-Sarpong, K; Wuni, I Y and Tetteh, M O (2023) Systematic review on the integration of building information modelling and prefabrication construction for low-carbon building delivery. Building Research & Information, 51(3), pp. 279-300. ISSN 0961-3218
Yik, F W H and Lee, W L (2004) Partnership in building energy performance contracting. Building Research & Information, 32(3), pp. 235-243. ISSN 0961-3218
Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599
Ying, J F; Tookey, J and Roberti, J (2015) SCM competencies in construction: Issues and challenges in New Zealand. Journal of Engineering, Design and Technology, 13(4), pp. 522-538.
Yousefzadeh, S; Spillane, J P; Lamont, L; McFadden, J and Lim, J P B (2015) Building information modelling (BIM) software interoperability: A review of the construction sector. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Yuan, J; Li, X; Ke, Y; Xu, W; Xu, Z and Skibniewski, M (2020) Developing a building information modeling-based performance management system for public-private partnerships. Engineering, Construction and Architectural Management, 27(8), pp. 1727-1762. ISSN 0969-9988
Yuan, J; Zeng, A Y; Skibniewski, M J and Li, Q (2009) Selection of performance objectives and key performance indicators in public-private partnership projects to achieve value for money. Construction Management and Economics, 27(3), pp. 253-270. ISSN 1466433X
Yucel, B and Azhar, S (2026) Startup engagement and innovation strategies in mid- to large-sized US construction firms. Journal of Construction Engineering and Management, 152(4): 04026021, ISSN 0733-9364
Zahoor, H; Chan, A P C; Utama, W P; Gao, R and Memon, S A (2017) Determinants of safety climate for building projects: SEM-based cross-validation study. Journal of Construction Engineering and Management, 143(6): 05017005, ISSN 0733-9364
Zakeri Afshar, A; Abbasianjahromi, H; Mirhosseini, S M and Ehsanifar, M (2025) Determining the range of negotiable prices for public–private partnership infrastructure projects: A simulation approach. International Journal of Building Pathology and Adaptation, 43(1), pp. 50-74. ISSN 2398-4708
Zapata Quimbayo, C A and Mejía Vega, C A (2023) Credit risk in infrastructure PPP projects under the real options approach. Construction Management and Economics, 41(4), pp. 293-306. ISSN 01446193
Zapata Quimbayo, C A; Mejía Vega, C A and Marques, N L (2019) Minimum revenue guarantees valuation in PPP projects under a mean reverting process. Construction Management and Economics, 37(3), pp. 121-138. ISSN 01446193
Zawawi, M I b Z (2017) Improving competition within public private partnership (PPP) procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.
Zeng, N; Liu, Y; Wang, C; Chen, Q; Liu, Y and Li, Q (2026) On- and off-site coordination in a modular construction supply chain: Domain-spanning production flow framing and evaluation. Journal of Construction Engineering and Management, 152(2): 04025245, ISSN 0733-9364
Zerihun, A; Beza, D and Idrisi, M J (2025) Factors affecting contractor and subcontractor relationship and their effects on building project performance: Case of Addis Ababa. International Journal of Construction Management, 25(14), pp. 1716-1724. ISSN 1562-3599
Zhan, W and Pan, W (2020) Formulating systemic construction productivity enhancement strategies. Journal of Construction Engineering and Management, 146(8): 05020008, ISSN 0733-9364
Zhang, K.; Shaheen, Q. H. and Cui, Q. (2026) Understanding structured project finance for US transportation public-private partnerships: What maximizes financing capacity? Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X
Zhang, S; Zhang, S; Zhao, Z; Liu, H; Wang, C; Wang, X and Yan, L (2026) BIM and semantic web-based circular design system for sustainable construction management of hydropower engineering. Journal of Construction Engineering and Management, 152(3): 04026002, ISSN 0733-9364
Zhang, H; Yu, L and Zhang, W (2020) Dynamic performance incentive model with supervision mechanism for PPP projects. Engineering, Construction and Architectural Management, 27(9), pp. 2643-2659. ISSN 0969-9988
Zhang, J; Chen, F and Yuan, X X (2020) Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: A Canadian study. Construction Management and Economics, 38(8), pp. 739-755. ISSN 01446193
Zhang, J; Li, H; Li, V; Xia, B and Skitmore, M (2021) Internal relationships of market-oriented efqm enablers in the Chinese construction industry. Engineering, Construction and Architectural Management, 28(3), pp. 765-787. ISSN 0969-9988
Zhang, J; Wang, T and Zhang, L (2021) Legal risk assessment framework for international PPP projects based on metanetwork. Journal of Construction Engineering and Management, 147(8): 04021090, ISSN 0733-9364
Zhang, J and Yuan, X X (2021) Stochastic modelling of maintenance flexibility in value for money assessment of PPP road projects. Construction Management and Economics, 39(2), pp. 173-191. ISSN 01446193
Zhang, J; Zou, W and Kumaraswamy, M (2015) Developing public private people partnership (4P) for post disaster infrastructure procurement. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 468-484. ISSN 1759-5916
Zhang, K and Cui, Q (2020) Does P3 favour large companies? From equity financing to social equity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Zhang, K; Cui, Q and DeCorla-Souza, P (2025) Performance and efficiency diffusion of us surface transportation public-private partnerships. Journal of Construction Engineering and Management, 151(1): 04024192, ISSN 0733-9364
Zhang, L and El-Gohary, N (2023) Human-centred and BIM-integrated automated value analysis of buildings. International Journal of Construction Management, 23(11), pp. 1911-1923. ISSN 1562-3599
Zhang, L and El-Gohary, N M (2016) Discovering stakeholder values for axiology-based value analysis of building projects. Journal of Construction Engineering and Management, 142(4): 04015095, ISSN 0733-9364
Zhang, L and El-Gohary, N M (2021) Axiology-based valuation modeling for human-centered decision making in building planning and design. Journal of Construction Engineering and Management, 147(11): 04021138, ISSN 0733-9364
Zhang, L; Shi, L and Ma, L (2024) Effect of public–private partnership features on contractual complexity: Evidence from China. Engineering, Construction and Architectural Management, 31(10), pp. 3876-3894. ISSN 0969-9988
Zhang, L; Wong, W F and Chen, P H (2010) Critical factors influencing learning effectiveness in international construction joint ventures. International Journal of Construction Management, 10(1), pp. 87-100. ISSN 1562-3599
Zhang, M; Xue, X; Luo, T; Li, M and Tang, X (2024) The supportability evaluation of cross-regional major infrastructure projects based on the combination weighting of the game theory-cloud model. Engineering, Construction and Architectural Management, 31(9), pp. 3679-3705. ISSN 0969-9988
Zhang, N; Deng, X; Hwang, B G; Bi, M and Mahmoudi, A (2022) A novel approach to selecting the best partner for high-speed rail firms. Engineering, Construction and Architectural Management, 29(5), pp. 2130-2152. ISSN 0969-9988
Zhang, S (2019) Developing commercial capabilities for infrastructure delivery: A dynamic capabilities view. PhD thesis, University of Hong Kong, Hong Kong.
Zhang, S; Leiringer, R and Winch, G (2024) Procuring infrastructure public-private partnerships: Capability development and learning from an owner perspective. Construction Management and Economics, 42(1), pp. 35-53. ISSN 01446193
Zhang, S; Li, J; Li, Y and Zhang, X (2021) Revenue risk allocation mechanism in public-private partnership projects: Swing option approach. Journal of Construction Engineering and Management, 147(1): 04020153, ISSN 0733-9364
Zhang, X (2004) Concessionaire selection: Methods and criteria. Journal of Construction Engineering and Management, 130(2), pp. 235-244. ISSN 0733-9364
Zhang, X (2004) Improving concessionaire selection protocols in public/ private partnered infrastructure projects. Journal of Construction Engineering and Management, 130(5), pp. 670-679. ISSN 0733-9364
Zhang, X (2005) Criteria for selecting the private-sector partner in public-private partnerships. Journal of Construction Engineering and Management, 131(6), pp. 631-644. ISSN 0733-9364
Zhang, X (2005) Critical success factors for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 3-14. ISSN 0733-9364
Zhang, X (2005) Paving the way for public-private partnerships in infrastructure development. Journal of Construction Engineering and Management, 131(1), pp. 71-80. ISSN 0733-9364
Zhang, X (2006) Factor analysis of public clients' best-value objective in public-privately partnered infrastructure projects. Journal of Construction Engineering and Management, 132(9), pp. 956-965. ISSN 0733-9364
Zhang, X (2006) Public clients' best value perspectives of public private partnerships in infrastructure development. Journal of Construction Engineering and Management, 132(2), pp. 107-114. ISSN 0733-9364
Zhang, X (2006) Toward innovative and efficient infrastructure delivery. PhD thesis, University of Alberta, Canada.
Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364
Zhang, X and Liu, J (2022) Incentive mechanism and value-added in PPP projects considering financial institutions' early intervention. Journal of Construction Engineering and Management, 148(4): 4022001, ISSN 0733-9364
Zhang, X and Tariq, S (2020) Failure mechanisms in international water PPP projects: A public sector perspective. Journal of Construction Engineering and Management, 146(6): 04020055, ISSN 0733-9364
Zhang, X Q and Kumaraswamy, M M (2000) Choosing concessionaires in BOT-type projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Zhang, X Q and Kumaraswamy, M M (2001) Procurement protocols for public-private partnered projects. Journal of Construction Engineering and Management, 127(5), pp. 351-358. ISSN 0733-9364
Zhang, Y and Tan, W (2019) The leading small group: An institutional innovation for PPP projects in China. Built Environment Project and Asset Management, 9(2), pp. 291-301. ISSN 2044-124X
Zhang, Y; Yuan, J; Zhao, J; Cheng, L and Li, Q (2022) Hybrid dynamic pricing model for transport PPP projects during the residual concession period. Journal of Construction Engineering and Management, 148(2): 04021200, ISSN 0733-9364
Zhao, F.; Shi, S. and Fu, X. (2026) Research on decision-making of project financing models based on tri-reference point theory: Evidence from public-private partnerships (PPPs) in China. Engineering, Construction and Architectural Management, 27(5), pp. 1-28. ISSN 0969-9988
Zhao, C E (2007) Financial risk management of PPP projects in the UK and China: A comparative study. PhD thesis, University of London, University College London, UK.
Zhao, J (2022) Rethinking value for money in Public Private Partnerships: a critique, analysis and model for transport infrastructure projects. PhD thesis, Northumbria University, UK.
Zhao, J; Thurairajah, N; Greenwood, D; Liu, H and Yuan, J (2023) Unpacking the context of value for money assessment in global markets: A procurement option framework for public-private partnerships. Engineering, Construction and Architectural Management, 30(8), pp. 3583-3601. ISSN 0969-9988
Zhao, N and Ying, F (2019) Method selection: A conceptual framework for public sector PPP selection. Built Environment Project and Asset Management, 9(2), pp. 214-232. ISSN 2044-124X
Zheng, X; Qin, Y; Xue, H; Hu, X and Skitmore, M (2026) How formal control fosters relational behavior for innovation performance in infrastructure megaprojects. Journal of Construction Engineering and Management, 152(3): 04025269, ISSN 0733-9364
Zheng, S and Tiong, R L K (2010) First public-private-partnership application in taiwan's wastewater treatment sector: Case study of the nanzih BOT wastewater treatment project. Journal of Construction Engineering and Management, 136(8), pp. 913-922. ISSN 0733-9364
Zheng, X; Li, R; Han, Y; Xue, R and Bai, J (2023) The dilemma of operator selection in urban rail transit PPP project operations: A LASSO approach. Journal of Construction Engineering and Management, 149(7): 05023007, ISSN 0733-9364
Zhou, L and Lowe, D J (2004) Incorporating sustainable construction into PFI projects: An analysis of financial incentives and associated risks. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Zhou, Y; Liu, J; Pu, X and Ding, Y (2025) Signaling game analysis of transfer mechanisms of PPP projects: Considering investors' moral hazard and adverse selection behavior. Journal of Construction Engineering and Management, 151(5): 04025030, ISSN 0733-9364
Zhou, Y; Wang, D; Liu, G; Wang, J and Li, K (2017) A method for tenant selection of China's construction industrial parks through industrial symbiosis. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Zhu, F; Sun, M; Wang, L; Sun, X and Yu, M (2019) Value conflicts between local government and private sector in stock public-private partnership projects: A case of China. Engineering, Construction and Architectural Management, 26(6), pp. 907-926. ISSN 0969-9988
Zhu, J; Chen, J; Jin, W and Li, Q (2025) Developing incentive mechanisms for long-term and short-term technological innovation in major engineering projects using principal-agent theory. Engineering, Construction and Architectural Management, 32(3), pp. 1947-1969. ISSN 0969-9988
Zhu, J; Shi, Q; Zhang, C; Yuan, J; Li, Q and Wang, X (2024) Investigating cooperative strategies in low-carbon public-private partnership projects through evolutionary game. Engineering, Construction and Architectural Management, 31(2), pp. 789-811. ISSN 0969-9988
Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.
Zimina, D; Ballard, G and Pasquire, C (2012) Target value design: Using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(5), pp. 383-398. ISSN 1466433X
Zin, Z M I; Kulatunga, U and Thayaparan, M (2016) Malaysian experience with public-private partnership: Managing unsolicited proposal. Built Environment Project and Asset Management, 6(5), pp. 508-520. ISSN 2044-124X
Zong, H; Wang, G and Cao, D (2025) Collaborative networks between contractors and subcontractors for infrastructure development: A comparative study of national quality award projects in China. Engineering, Construction and Architectural Management, 32(2), pp. 1074-1096. ISSN 0969-9988
Zou, P X W and Leslie-Carter, R (2010) Lessons learned from managing the design of the 'water cube' national swimming centre for the Beijing 2008 Olympic Games. Architectural Engineering and Design Management, 6(3), pp. 175-188. ISSN 1745-2007
Zou, P X W; Wang, S and Fang, D (2008) A life-cycle risk management framework for PPP infrastructure projects. Journal of Financial Management of Property and Construction, 13(2), pp. 123-142. ISSN 1366-4387
Zou, W (2012) Relationship management in public private partnership infrastructure projects. PhD thesis, University of Hong Kong, Hong Kong.
Zulu, E; Mutwale, J; Zulu, S L; Musonda, I; Kavishe, N and Moobela, C (2025) Challenges, drivers and incentives to private sector participation in public-private partnership projects in developing countries: Evidence from Zambia. Journal of Engineering, Design and Technology, 23(2), pp. 386-405. ISSN 1726-0531
af Hällström, A and Bosch-Sijtsema, P (2019) Early contractor involvement in the construction industry: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
af Hällström, A and Bosch-Sijtsema, P (2020) Collaboration and relationships in Nordic infrastructure project networks. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
de Castro e Silva Neto, D (2019) Contributions to the governance and renegotiation processes of public-private partnerships in Brazil. PhD thesis, Universidade de Aveiro, Portugal.
de Marco, A; Mangano, G and Zou, X Y (2012) Factors influencing the equity share of build-operate-transfer projects. Built Environment Project and Asset Management, 2(1), pp. 70-85. ISSN 2044-124X
van Uden, M F M (2025) Reconfiguration of practices towards a circular economy in the architecture, engineering, and construction sector: Change throughout a persistent system. PhD thesis, Delft University of Technology, Netherlands.
van den Hurk, M (2015) What's the deal? Standardizing contracts for public-private partnerships. PhD thesis, Universiteit Antwerpen, Belgium.
van der Ham, M and Opdenakker, R (2023) Overcoming process-related barriers in modular high-rise building projects. International Journal of Construction Management, 23(10), pp. 1779-1789. ISSN 1562-3599
van der Heijden, J (2024) Public governance in the context of construction 4.0: A systematic and comprehensive literature review. Smart and Sustainable Built Environment, 13(3), pp. 737-756. ISSN 2046-6099
van der Kuyp, D J (2018) Strategies construction managerial leaders use to counteract material cost overruns. PhD thesis, Walden University, USA.
van der Veen, B; Voordijk, H and Dorée, A (2001) Innovation of construction in the Dutch railways: Lessons from inter-organizational co-operation. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Özorhon, B (2007) Modeling the performance of international construction joint ventures. PhD thesis, Middle East Technical University, Turkey.
Özçekici Olcar, Ç (2021) A model for exploring evolution of strategic alliances in project-based industries: The case of construction industry. PhD thesis, Izmir Institute of Technology, Turkey.
Up a level