Items with Subject: operations research

Number of items: 1307.

Abbasi, S; Taghizade, K and Noorzai, E (2020) BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints. Journal of Construction Engineering and Management, 146(12): 04020143, ISSN 0733-9364

AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.

Abdallah, A M (2021) A study on bridge inspections: Identifying barriers to new practices and providing strategies for change. PhD thesis, Colorado State University, USA.

Abdel-Monem, M and Hegazy, T (2013) Enhancing construction as-built documentation using interactive voice response. Journal of Construction Engineering and Management, 139(7), pp. 895-898. ISSN 0733-9364

Abdelazeem, A S and Ibrahim, A H (2022) Evaluation of project cost and schedule performance using fuzzy theory-based polynomial function. International Journal of Construction Management, 22(13), pp. 2564-2576. ISSN 1562-3599

Abdelmohsen, S M A (2011) An ethnographically informed analysis of design intent communication in BIM-enabled architectural practice. PhD thesis, Georgia Institute of Technology, USA.

Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193

Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.

Abdulhadi, M A M E (2012) IT adoption in the construction sector in Libya. PhD thesis, University of Glamorgan, UK.

Abeid, J and Arditi, D (2003) Photo-net: An integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(3), pp. 162-171. ISSN 0969-9988

Abeid, J N (2000) Photo-net: An integrated system for controlling the progress of construction activities. PhD thesis, Illinois Institute of Technology, USA.

AbouRizk, S M and Wales, R J (1997) Combined discrete-event/continuous simulation for project planning. Journal of Construction Engineering and Management, 123(1), pp. 11-20. ISSN 0733-9364

Abu Hammad, A A (2003) A decision support system for manufactured housing production process planning and facility layout. PhD thesis, University of Cincinnati, USA.

Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria. PhD thesis, University of California, Berkeley, USA.

Abubaker, A E (2010) Improvement of project planning in Libya. PhD thesis, University of Newcastle upon Tyne, UK.

Abubaker, A E; Greenwood, D and Osborne, A (2008) A study of project planning on Libyan construction projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Abudayyeh, O; Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of trends in construction research: 1985-2002. Journal of Construction Engineering and Management, 130(3), pp. 433-439. ISSN 0733-9364

Adebisi, E O; Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(2), pp. 210-231. ISSN 23984708

Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364

Adesina, Adebola (2025) Examining influential factors on the success of project management in education: A content analysis. EdD thesis, University of Nevada, Reno, USA.

Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects. PhD thesis, University of Strathclyde, UK.

Afshar, M R; Shahhosseini, V and Sebt, M H (2022) A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(3), pp. 357-365. ISSN 1562-3599

Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193

Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects. PhD thesis, Nottingham Trent University, UK.

Ahluwalia, S S (2009) A framework for efficient condition assessment of the building infrastructure. PhD thesis, University of Waterloo, Canada.

Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.

Ahmed, T; Hossain, S M and Hossain, M A (2021) Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling. International Journal of Construction Management, 21(4), pp. 404-415. ISSN 1562-3599

Ahn, C R and Lee, S (2013) Importance of operational efficiency to achieve energy efficiency and exhaust emission reduction of construction operations. Journal of Construction Engineering and Management, 139(4), pp. 404-413. ISSN 0733-9364

Ahrari, A (2012) A decision support system for dynamic integrated project scheduling and equipment operation planning. PhD thesis, University of Maryland, College Park, USA.

Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: Current research status. Construction Innovation, 4(1), pp. 19-31. ISSN 1471-4175

Aigbavboa, C and Thwala, W (2014) An assessment of critical success factors for the reduction of the cost of poor quality from construction projects in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Aiyetan, O A and Dillip, D (2018) System dynamics approach to mitigating skilled labour shortages in the construction industry: A South Africa context. Construction Economics and Building, 18(4), pp. 45-63. ISSN 2204-9029

Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599

Akar, G (2009) Analysis of activity choice: The role of activity attributes and individual schedules. PhD thesis, University of Maryland, College Park, USA.

Akin, F D; Damci, A and Arditi, D (2024) Optimum finance-based scheduling. Journal of Construction Engineering and Management, 150(9): 04024104, ISSN 0733-9364

Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599

Akinci, B; Fischer, M and Kunz, J (2002) Automated generation of work spaces required by construction activities. Journal of Construction Engineering and Management, 128(4), pp. 306-315. ISSN 0733-9364

Akinci, B; Fischer, M; Kunz, J and Levitt, R (2002) Representing work spaces generically in construction method models. Journal of Construction Engineering and Management, 128(4), pp. 296-305. ISSN 0733-9364

Akinci, B H (2000) Automatic generation of work spaces and analysis of time-space conflicts at construction sites. PhD thesis, Stanford University, USA.

Al Nasseri, H and Aulin, R (2016) Enablers and barriers to project planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(2), pp. 1-20. ISSN 1823-6499

Al Nasseri, H and Aulin, R (2016) Understanding management roles and organisational behaviours in planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(1), pp. 1-18. ISSN 1823-6499

Al Nasseri, H A; Widen, K and Aulin, R (2016) A taxonomy of planning and scheduling methods to support their more efficient use in construction project management. Journal of Engineering, Design and Technology, 14(3), pp. 580-601.

Al-Amin, Md (2023) Pavement maintenance and rehabilitation programming and budget allocation from strategic perspectives: Multiobjective optimization models. PhD thesis, University of Texas at Austin, USA.

Al-Gahtani, K S (2009) Float allocation using the total risk approach. Journal of Construction Engineering and Management, 135(2), pp. 88-95. ISSN 0733-9364

Al-Ghzawi, M and El-Rayes, K (2023) Optimizing the planning of airport airside expansion projects to minimize air traffic disruptions and construction cost. Journal of Construction Engineering and Management, 149(4): 04023013, ISSN 0733-9364

Al-Joma, M and Mangin, J C (2004) A scheduling model for repetitive activities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Al-Kaisy, A and Nassar, K (2009) Developing a decision support tool for nighttime construction in highway projects. Journal of Construction Engineering and Management, 135(2), pp. 119-125. ISSN 0733-9364

Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization. PhD thesis, University of Colorado at Boulder, USA.

Al-Sasi, B O (2007) A lean approach to capacity management in construction. PhD thesis, University of Southampton, UK.

Al-Sedairy, S (1984) Large scale projects: management, design and execution. PhD thesis, University of Sheffield, UK.

Al-Werikat, G K E (2017) The impact of supply chain management on construction projects performance in Jordan. PhD thesis, Coventry University, UK.

Al-Zahrani, J I (2013) The impact of contractors' attributes on construction project success. PhD thesis, University of Manchester, UK.

Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.

AlNasseri, H A (2015) Understanding applications of project planning and scheduling in construction projects. PhD thesis, Lund University, Sweden.

Alajmani, H; Ahmed, S and El-Sayegh, S M (2024) Factors causing delays in the UAE construction industry amid the covid-19 pandemic. Journal of Financial Management of Property and Construction, 29(1), pp. 135-151. ISSN 1366-4387

Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364

Alashari, M; El-Rayes, K and Alotaibi, M (2023) Optimizing the planning of maintenance activities in education buildings. Journal of Construction Engineering and Management, 149(10): 04023094, ISSN 0733-9364

Alavipour, S M (2017) Project scheduling using optimized financing. PhD thesis, Illinois Institute of Technology, USA.

Alavipour, S M R and Arditi, D (2018) Optimizing financing cost in construction projects with fixed project duration. Journal of Construction Engineering and Management, 144(4): 04018012, ISSN 0733-9364

Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988

Alemu, S K (2022) Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(5), pp. 2183-2206. ISSN 0969-9988

Ali, A H; Kineber, A F; Elyamany, A; Ibrahim, A H and Daoud, A O (2025) Application of Ginni's mean analysis for identifying the stationary driver enhancing modular construction adoption in the building industry. International Journal of Construction Management, 25(3), pp. 322-333. ISSN 1562-3599

Ali, M M and Elazouni, A (2009) Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Construction Management and Economics, 27(9), pp. 839-856. ISSN 1466433X

Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364

Alinaitwe, H; Nyamutale, W and Tindiwensi, D (2014) Design phase constructability improvement strategies for highway projects in Uganda. Journal of Construction in Developing Countries, 19(1), pp. 127-140. ISSN 1823-6499

Alkass, S; Mazerolle, M and Harris, F (1996) Construction delay analysis techniques. Construction Management and Economics, 14(5), pp. 375-394. ISSN 01446193

Alkayyali, O J (1993) A computerized multi-dimensional support system (CM-DSS) for planning, scheduling and controlling construction projects. PhD thesis, University of Cincinnati, USA.

Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects. PhD thesis, Brunel University, UK.

Allam, S I G (1988) Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(2), pp. 93-115. ISSN 01446193

Alleman, D and Lee, E B (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), pp. 2859-2891. ISSN 0969-9988

Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.

Almatroushi, H; Hariga, M; As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: An integrated approach. Engineering, Construction and Architectural Management, 27(9), pp. 2135-2161. ISSN 0969-9988

Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.

Alotaibi, M; El-Rayes, K and Altuwaim, A (2021) Optimizing the renovation scheduling of leased residential buildings to minimize total project cost. Journal of Construction Engineering and Management, 147(7): 2063, ISSN 0733-9364

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique. PhD thesis, Brunel University, UK.

Altuwaim, A and El-Rayes, K (2018) Optimizing the scheduling of repetitive construction to minimize interruption cost. Journal of Construction Engineering and Management, 144(7): 4018051, ISSN 0733-9364

Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364

Altuwaim, A A (2018) Optimal scheduling and resource utilization for repetitive construction projects. PhD thesis, University of Illinois, USA.

Alzayd, Rana (2016) A constructability methodology to integrate planning and design for workers' safety in construction management. DrIng thesis, University of Braunschweig & University of Florence, Germany.

Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599

Amany, A; Taghizade, K and Noorzai, E (2020) Investigating conflicts of expert contractors using the last planner system in building information modeling process. Journal of Engineering, Design and Technology, 18(6), pp. 1381-1402. ISSN 1726-0531

Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988

Amer, F; Koh, H Y and Golparvar-Fard, M (2021) Automated methods and systems for construction planning and scheduling: Critical review of three decades of research. Journal of Construction Engineering and Management, 147(7): 0002093, ISSN 0733-9364

Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599

Ammar, M A (2003) Float analysis of non-serial repetitive activities. Construction Management and Economics, 21(5), pp. 535-542. ISSN 01446193

Ammar, M A (2011) Optimization of project time-cost trade-off problem with discounted cash flows. Journal of Construction Engineering and Management, 137(1), pp. 65-71. ISSN 0733-9364

Ammar, M A (2013) LOB and CPM integrated method for scheduling repetitive projects. Journal of Construction Engineering and Management, 139(1), pp. 44-50. ISSN 0733-9364

Ammar, M A (2020) Efficient modeling of time-cost trade-off problem by eliminating redundant paths. International Journal of Construction Management, 20(7), pp. 812-821. ISSN 1562-3599

Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193

Ammar, M A (2022) Optimization of line of balance scheduling considering work interruption. International Journal of Construction Management, 22(2), pp. 305-316. ISSN 1562-3599

Ammar, M A and Abd-ElKhalek, S I (2022) Criticality measurement in fuzzy project scheduling. International Journal of Construction Management, 22(2), pp. 252-261. ISSN 1562-3599

Ammar, M A and Abdel-Maged, A F (2018) Modeling of LOB scheduling with learning development effect. International Journal of Construction Management, 18(6), pp. 517-526. ISSN 1562-3599

Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193

An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988

Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(2), pp. 163-175. ISSN 1466433X

Andersen, M T and Findsen, A L (2019) Exploring the benefits of structured information with the use of virtual design and construction principles in a BIM life-cycle approach. Architectural Engineering and Design Management, 15(2), pp. 83-100. ISSN 1745-2007

Anson, M; Tang, S L and Ying, K C (2002) Measurement of the performance of ready mixed concreting resources as data for system simulation. Construction Management and Economics, 20(3), pp. 237-250. ISSN 01446193

Anson, M; Ying, K C T and Siu, M F F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(8), pp. 1672-1695. ISSN 0969-9988

Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.

Aouad, G F; Kawooya, A A O and Price, A D F (1996) Construction planning models: A review of history, capabilities and limitations. Journal of Construction Procurement, 2(2), pp. 19-37. ISSN 1358-9180

Apipattanavis, S; Sabol, K; Molenaar, K R; Rajagopalan, B; Xi, Y; Blackard, B and Patil, S (2010) Integrated framework for quantifying and predicting weather-related highway construction delays. Journal of Construction Engineering and Management, 136(11), pp. 1160-1168. ISSN 0733-9364

Appau, K A (1994) An integrated model of computer-aided cost estimating/scheduling in construction management. PhD thesis, Georgia Institute of Technology, USA.

Arabpour Roghabadi, M and Moselhi, O (2021) Optimized crew selection for scheduling of repetitive projects. Engineering, Construction and Architectural Management, 28(6), pp. 1517-1540. ISSN 0969-9988

Arashpour, M; Wakefield, R; Blismas, N and Abbasi, B (2016) Quantitative analysis of rate-driven and due date-driven construction: Production efficiency, supervision, and controllability in residential projects. Journal of Construction Engineering and Management, 142(1): 05015012, ISSN 0733-9364

Araujo, Luís Otávio Cocito de (2005) Method to propose directions improving labor productivity in the steel reinforcement activities. PhD thesis, Universidade de São Paulo, Brazil.

Arditi, D (1984) Graduate education in construction management. Construction Management and Economics, 2(3), pp. 193-199. ISSN 01446193

Arditi, D (1985) Construction productivity improvement. Journal of Construction Engineering and Management, 111(1), pp. 1-14. ISSN 0733-9364

Arditi, D and Albulak, M Z (1986) Line-of-balance scheduling in pavement construction. Journal of Construction Engineering and Management, 112(3), pp. 411-424. ISSN 0733-9364

Arditi, D; Elhassan, A and Toklu, Y C (2002) Constructability analysis in the design firm. Journal of Construction Engineering and Management, 128(2), pp. 117-126. ISSN 0733-9364

Arditi, D and Koseoglu, H (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics, 1(1), pp. 3-16. ISSN 01446193

Arditi, D and Mochtar, K (1996) Productivity improvement in the Indonesian construction industry. Construction Management and Economics, 14(1), pp. 13-24. ISSN 01446193

Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193

Arditi, D and Pattanakitchamroon, T (2008) Analysis methods in time-based claims. Journal of Construction Engineering and Management, 134(4), pp. 242-252. ISSN 0733-9364

Arditi, D; Sikangwan, P and Tokdemir, O B (2002) Scheduling system for high rise building construction. Construction Management and Economics, 20(4), pp. 353-364. ISSN 01446193

Arditi, D; Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), pp. 90-103. ISSN 0969-9988

Arditi, D; Tokdemir, O B and Suh, K (2002) Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management, 128(6), pp. 545-556. ISSN 0733-9364

Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.

Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.

Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364

Aslani, P (2007) Dynamic resource -constrained scheduling. PhD thesis, Polytechnic University, USA.

Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran. PhD thesis, Nottingham Trent University, UK.

Asnaashari, E; Knight, A; Hurst, A and Farahani, S S (2009) Causes of construction delays in Iran: Project management, logistics, technology and environment. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Atapattu, C N; Domingo, N and Sutrisna, M (2023) Significant factors affecting the New Zealand transportation infrastructure project cost: quantity surveyors' perception. Built Environment Project and Asset Management, 13(5), pp. 756-777. ISSN 2044-124X

Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599

Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.

Atkinson, B (2000) Inca: A retrospective performance tool for project management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193

Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.

Ayinla, K (2021) Development of a semantic knowledge modelling approach for evaluating offsite manufacturing production processes. PhD thesis, Birmingham City University, UK.

Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.

Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099

Badra, N; Hegazy, H; Zhang, J; Yahia, M; Fathy, M and AboulHaggag, S (2025) Application of fuzzy multi-objective model for crashing the construction of steel structure projects post-pandemic (Covid-19). International Journal of Construction Management, 25(3), pp. 363-374. ISSN 1562-3599

Bajjou, M S and Chafi, A (2026) Enhancing environmental sustainability through lean construction principles: An industry-based SEM analysis. Engineering, Construction and Architectural Management, 33(1), pp. 171-206. ISSN 0969-9988

Bajjou, M S and Chafi, A (2020) Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management, 20(7), pp. 783-800. ISSN 1562-3599

Bajjou, M S and Chafi, A (2025) Developing and validating a new conceptual model for successful implementation of lean construction: SEM analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1581-1620. ISSN 0969-9988

Bakry, I; Moselhi, O and Zayed, T (2016) Optimized scheduling and buffering of repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 23(6), pp. 782-800. ISSN 0969-9988

Ballesteros-Pérez, P (2017) M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063, ISSN 0733-9364

Ballesteros-Pérez, P; Sanz-Ablanedo, E; Cerezo-Narváez, A; Lucko, G; Pastor-Fernández, A; Otero-Mateo, M and Contreras-Samper, J P (2020) Forecasting accuracy of in-progress activity duration and cost estimates. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364

Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364

Banik, G C (2001) Construction productivity improvement: Current US perspective. Journal of Construction Procurement, 7(2), pp. 60-71. ISSN 1358-9180

Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(1), pp. 1-18. ISSN 1562-3599

Barraza, G A (2011) Probabilistic estimation and allocation of project time contingency. Journal of Construction Engineering and Management, 137(4), pp. 259-265. ISSN 0733-9364

Barraza, G A; Back, W E and Mata, F (2004) Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25-32. ISSN 0733-9364

Barraza, G A and Bueno, R A (2007) Probabilistic control of project performance using control limit curves. Journal of Construction Engineering and Management, 133(12), pp. 957-965. ISSN 0733-9364

Bashford, H H; Sawhney, A; Walsh, K D and Kot, K (2003) Implications of even flow production methodology for U.S. Housing industry. Journal of Construction Engineering and Management, 129(3), pp. 330-332. ISSN 0733-9364

Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364

Bates, M; Sturges, J; McGowan, K and Sommerville, J (1999) Material supply in house construction: The potential to enhance performance by improving communication. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.

Bayraktar, M E and Hastak, M (2009) Bayesian belief network model for decision making in highway maintenance: Case studies. Journal of Construction Engineering and Management, 135(12), pp. 1357-1369. ISSN 0733-9364

Beheiry, S M A; Chong, W K and Haas, C T (2006) Examining the business impact of owner commitment to sustainability. Journal of Construction Engineering and Management, 132(4), pp. 384-392. ISSN 0733-9364

Bekdik, B; Pörzgen, J; Bull, S S and Thuesen, C (2018) Modularising design processes of façades in Denmark: Re-exploring the use of design structure matrix. Architectural Engineering and Design Management, 14(1-2), pp. 95-108. ISSN 1745-2007

Bell, L C and Stukhart, G (1987) Costs and benefits of materials management systems. Journal of Construction Engineering and Management, 113(2), pp. 222-234. ISSN 0733-9364

Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193

Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193

Bennett, Brian Kevin (2023) Increasing knowledge of scheduling activity sequencing in construction management education using interactive 3D gaming models. PhD thesis, University of Florida, USA.

Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.

Bentley, D and Stacey, R (1998) The potential for applying complex adaptive systems theory to the process of estimating in the construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Beran, V; Dlask, P; Eaton, D; Hromada, E and Zindulka, O (2011) Mapping of synchronous activities through virtual management momentum simulation. Construction Innovation, 11(2), pp. 190-211. ISSN 1471-4175

Bernold, L E and Treseler, J F (1991) Vendor analysis for best buy in construction. Journal of Construction Engineering and Management, 117(4), pp. 645-658. ISSN 0733-9364

Besiktepe, D; Sparkling, A; Debs, L and Manuel, R (2024) Digital technology applications in construction education: A systematic review of methodological pluralism. International Journal of Construction Education and Research, 20(4), pp. 421-443. ISSN 1557-8771

Bhatia, A; Moselhi, O and Han, S (2025) Hybrid optimization approach for scheduling in panelized construction manufacturing. Journal of Construction Engineering and Management, 151(8): 04025107, ISSN 0733-9364

Bhaumik, P K (2016) Developing and using a new family of project S-curves using early and late shape parameters. Journal of Construction Engineering and Management, 142(12): 04016076, ISSN 0733-9364

Bhih, M and Hegazy, T (2023) Multiple-window modified but-for analysis of project delays and accelerations. International Journal of Construction Management, 23(4), pp. 686-696. ISSN 1562-3599

Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364

Bilge, E Ç and Yaman, H (2022) Research trends analysis using text mining in construction management: 2000–2020. Engineering, Construction and Architectural Management, 29(8), pp. 3210-3233. ISSN 0969-9988

Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.

Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(2), pp. 200-211. ISSN 1471-4175

Blakey, L H (1990) Bar codes: Prescription for precision, performance, and productivity. Journal of Construction Engineering and Management, 116(3), pp. 468-479. ISSN 0733-9364

Boateng, P (2014) A dynamic systems approach to risk assessment in megaprojects. PhD thesis, Heriot-Watt University, UK.

Bogus, S M; Diekmann, J E; Molenaar, K R; Harper, C; Patil, S and Lee, J S (2011) Simulation of overlapping design activities in concurrent engineering. Journal of Construction Engineering and Management, 137(11), pp. 950-957. ISSN 0733-9364

Bonnal, P; Gourc, D; Hameri, A P and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(8), pp. 797-814. ISSN 01446193

Bonnal, P; Gourc, D and Lacoste, G (2004) Where do we stand with fuzzy project scheduling? Journal of Construction Engineering and Management, 130(1), pp. 114-123. ISSN 0733-9364

Bordoli, D W and Baldwin, A N (1998) A methodology for assessing construction project delays. Construction Management and Economics, 16(3), pp. 327-337. ISSN 01446193

Borges, W F and Mário, P D C (2017) Five project-duration control methods in time units: Case study of a linearly distributed planned value. Journal of Construction Engineering and Management, 143(6): 05017002, ISSN 0733-9364

Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.

Bowen, P; Govender, R and Edwards, P (2014) Structural equation modeling of occupational stress in the construction industry. Journal of Construction Engineering and Management, 140(9): 04014042, ISSN 0733-9364

Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems. PhD thesis, University of California, Berkeley, USA.

Bragadin, M A and Kähkönen, K (2016) Schedule health assessment of construction projects. Construction Management and Economics, 34(12), pp. 875-897. ISSN 01446193

Braimah, N and Ndekugri, I (2009) Consultants' perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. ISSN 0733-9364

Brilakis, I and Soibelman, L (2006) Multimodal image retrieval from construction databases and model-based systems. Journal of Construction Engineering and Management, 132(7), pp. 777-785. ISSN 0733-9364

Brodetskaia, I; Sacks, R and Shapira, A (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics, 29(12), pp. 1209-1227. ISSN 1466433X

Browning, F R (1994) Planning system for hazardous waste site characterization. PhD thesis, University of Missouri - Rolla, USA.

Bryde, D J and Schulmeister, R (2012) Applying lean principles to a building refurbishment project: Experiences of key stakeholders. Construction Management and Economics, 30(9), pp. 777-794. ISSN 1466433X

Bubshait, A A and Cunningham, M J (1998) Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), pp. 315-322. ISSN 0733-9364

Bubshait, A A and Tahir, B M (1996) Planning and scheduling concrete repair work: a case study. Building Research & Information, 24(6), pp. 363-368. ISSN 0961-3218

Bugg, R A and Redden, L W (2020) Assessment and improvement of a required construction management service-learning course. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193

Bynum, P; Issa, R R A and Olbina, S (2013) Building information modeling in support of sustainable design and construction. Journal of Construction Engineering and Management, 139(1), pp. 24-34. ISSN 0733-9364

Büchmann-Slorup, R (2014) Applying critical chain buffer management theory in location-based management. Construction Management and Economics, 32(6), pp. 506-519. ISSN 01446193

Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.

Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988

Cancian, Glen A (2016) Heuristic based optimisation of pavement management scheduling. PhD thesis, Griffith University, Australia.

Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364

Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364

Caprario, Rick (2025) Interpersonal communication, relationships, and collaboration among construction specialty contractor project management professionals: A single case study. EdD thesis, Baylor University, USA.

Carmichael, S and Murray, M (2006) Record keeping for contemporaneous delay analysis: A model for effective event management. Construction Management and Economics, 24(10), pp. 1007-1018. ISSN 1466433X

Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.

Castro-Lacouture, D; Süer, G A; Gonzalez-Joaqui, J and Yates, J K (2009) Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method. Journal of Construction Engineering and Management, 135(10), pp. 1096-1104. ISSN 0733-9364

Celoza, A; De Oliveira, D P and Leite, F (2023) Qualitative analysis of the impact of contracts on information management in AEC projects. Journal of Construction Engineering and Management, 149(3): 04022185, ISSN 0733-9364

Cepeda, D M; Sohail, M and Ogunlowo, O O (2018) Understanding the critical success factors for delivery of megaprojects in Colombia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 45-57. ISSN 17514304

Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), pp. 351-362. ISSN 01446193

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, P W (2005) An interpretivistic approach to understand the factors that affect construction labour productivity. PhD thesis, Heriot-Watt University, UK.

Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364

Chan, W T; Chua, D K H and Kannan, G (1996) Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, 122(2), pp. 125-132. ISSN 0733-9364

Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364

Chand, Shelvin (2018) Automated design of heuristics for the resource constrained project scheduling problem. PhD thesis, University of New South Wales, Australia.

Chanda, E K and Gardiner, S (2010) A comparative study of truck cycle time prediction methods in open-pit mining. Engineering, Construction and Architectural Management, 17(5), pp. 446-460. ISSN 0969-9988

Chang, A S T and Tsai, Y W (2003) Engineering information classification system. Journal of Construction Engineering and Management, 129(4), pp. 454-460. ISSN 0733-9364

Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364

Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity. PhD thesis, University of Wisconsin - Madison, USA.

Chang, T C; William, C and Crandall, K C (1990) Network resource allocation with support of a fuzzy expert system. Journal of Construction Engineering and Management, 116(2), pp. 239-260. ISSN 0733-9364

Chang, T-C (1987) Network resource allocation using an expert system with fuzzy logic reasoning. PhD thesis, University of California, Berkeley, USA.

Chantawit, D; Hadikusumo, B H W; Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: Visualizing project scheduling and safety planning. Construction Innovation, 5(2), pp. 99-114. ISSN 1471-4175

Chasey, A D and Merchant, S (2000) Issues for construction of 300-mm fab. Journal of Construction Engineering and Management, 126(6), pp. 451-457. ISSN 0733-9364

Chassiakos, A P and Sakellaropoulos, S P (2005) Time-cost optimization of construction projects with generalized activity constraints. Journal of Construction Engineering and Management, 131(10), pp. 1115-1124. ISSN 0733-9364

Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364

Chehayeb, N N (1996) Simulation-based project control. PhD thesis, University of Alberta, Canada.

Chehayeb, N N and AbouRizk, S M (1998) Simulation-based scheduling with continuous activity relationships. Journal of Construction Engineering and Management, 124(2), pp. 107-115. ISSN 0733-9364

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Chen, C (2016) Crane planning optimization for construction. PhD thesis, National University of Singapore, Singapore.

Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.

Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364

Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364

Chen, Jamie (2025) Improving construction supply chain material management resilience through mathematical optimisation. PhD thesis, University of New South Wales, Australia.

Chen, L (2019) An integrated construction schedule risk analysis approach for infrastructure projects under uncertainty. PhD thesis, University of Hong Kong, Hong Kong.

Chen, L; Zhang, J and Peng, W (2022) Research on the hierarchical discrete time-cost trade-off problem for program. Journal of Construction Engineering and Management, 148(7): 04022039, ISSN 0733-9364

Chen, Q; Adey, B T; Haas, C T and Hall, D M (2022) Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation, 22(1), pp. 76-100. ISSN 1471-4175

Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains. PhD thesis, Stanford University, USA.

Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.

Chen, W (2019) Integration of building information modeling and internet of things for facility maintenance management. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.

Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technologies in the AEC sector: A comparative study of digital competence among industry practitioners. International Journal of Construction Management, 25(1), pp. 63-76. ISSN 1562-3599

Chen, Z; Boateng, P and Ogunlana, S O (2019) A dynamic system approach to risk analysis for megaproject delivery. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 232-252. ISSN 17514304

Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.

Cheng, M Y; Chang, Y H and Korir, D (2019) Novel approach to estimating schedule to completion in construction projects using sequence and nonsequence learning. Journal of Construction Engineering and Management, 145(11): 04019072, ISSN 0733-9364

Cheng, M Y; Huang, K Y and Hutomo, M (2018) Multiobjective dynamic-guiding PSO for optimizing work shift schedules. Journal of Construction Engineering and Management, 144(9): 04018089, ISSN 0733-9364

Cheraghi, E; Zohrehvandi, S; Vanhoucke, M and Mohamadpour Tosarkani, B (2023) A multiproject scheduling and resource management model in projects construction. Engineering, Construction and Architectural Management, 30(4), pp. 1578-1600. ISSN 0969-9988

Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364

Chileshe, N; Reza Hosseini, M and Jepson, J (2016) Critical barriers to implementing risk assessment and management practices in the Iranian construction sector. Journal of Construction in Developing Countries, 21(2), pp. 81-112. ISSN 1823-6499

Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.

Chiu H.N, T D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(1), pp. 55-66. ISSN 01446193

Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.

Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.

Choi, B; Lee, H S; Park, M; Cho, Y K and Kim, H (2014) Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management, 140(9): 04014041, ISSN 0733-9364

Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.

Choi, K; Kwak, Y H; Pyeon, J H and Son, K (2012) Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects. Journal of Construction Engineering and Management, 138(3), pp. 323-330. ISSN 0733-9364

Chong, W K O (2005) Construction production rate information system for highway projects. PhD thesis, University of Texas at Austin, USA.

Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364

Christodoulou, S (2005) Construction scheduling with artificial agents and the ant colony optimization metaheuristic. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Christodoulou, S E; Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5), pp. 518-527. ISSN 0733-9364

Christodoulou, S E; Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(3), pp. 229-240. ISSN 1466433X

Chrzanowski, E N and Johnston, D W (1986) Application of linear scheduling. Journal of Construction Engineering and Management, 112(4), pp. 476-491. ISSN 0733-9364

Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364

Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364

Chua, D K H; Tyagi, A; Ling, S and Bok, S H (2003) Process-parameter-interface model for design management. Journal of Construction Engineering and Management, 129(6), pp. 653-663. ISSN 0733-9364

Chua, D K H and Yeoh, K W (2011) PDM++: Planning framework from a construction requirements perspective. Journal of Construction Engineering and Management, 137(4), pp. 266-274. ISSN 0733-9364

Cleveland Jr, A B (2011) Emerging tools to enable construction engineering. Journal of Construction Engineering and Management, 137(10), pp. 836-842. ISSN 0733-9364

Cole, L J R (1991) Construction scheduling: Principles, practices, and six case studies. Journal of Construction Engineering and Management, 117(4), pp. 579-588. ISSN 0733-9364

Cosma, C (2003) Development of a systematic approach for uncertainty assessment in scheduling multiple repetitive construction processes by using fuzzy set theory. PhD thesis, University of Florida, USA.

Cottrell, W D (1999) Simplified program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 125(1), pp. 16-22. ISSN 0733-9364

Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(4), pp. 355-364. ISSN 01446193

Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(1), pp. 91-100. ISSN 01446193

D'Onofrio, R M (2017) CPM scheduling: A 60-year history. Journal of Construction Engineering and Management, 143(10): 02517010, ISSN 0733-9364

D'Orazio, M; Bernardini, G and Di Giuseppe, E (2024) Improving sustainable management of university buildings based on occupancy data. Journal of Construction Engineering and Management, 150(1): 04023154, ISSN 0733-9364

Da Rocha, C G and Kemmer, S L (2013) Method to implement delayed product differentiation in construction of high-rise apartment building projects. Journal of Construction Engineering and Management, 139(10): 05013001, ISSN 0733-9364

Dabbas, M A A (1981) Computerized decision making in construction. PhD thesis, Georgia Institute of Technology, USA.

Dainty, A R J; Harty, T E and Neale, R H (2000) Improving employee resourcing within large construction organizations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Damci, A (2022) Revisiting the concept of natural rhythm of production in line of balance scheduling. International Journal of Construction Management, 22(12), pp. 2335-2344. ISSN 1562-3599

Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364

Dan, Y and Liu, G (2024) Integrated scheduling optimization of production and transportation for precast component with delivery time window. Engineering, Construction and Architectural Management, 31(8), pp. 3335-3355. ISSN 0969-9988

Dang, T and Bargstädt, H J (2016) 4D relationships: The missing link in 4D scheduling. Journal of Construction Engineering and Management, 142(2): 04015072, ISSN 0733-9364

Darlow, M J (1968) Investigations into line of balance scheduling house building. PhD thesis, Loughborough University, UK.

Das, D K and Emuze, F (2017) A dynamic model of contractor-induced delays in India. Journal of Construction in Developing Countries, 22(1), pp. 21-39. ISSN 1823-6499

Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193

Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(2), pp. 210-230. ISSN 0969-9988

Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988

Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193

Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193

Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: An application to the pre-cast industry. Construction Management and Economics, 13(1), pp. 53-64. ISSN 01446193

Dawood, N N (1996) A strategy for a computer-based materials management system for the building industry. Journal of Financial Management of Property and Construction, 1(2), pp. 17-28. ISSN 1366-4387

Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.

De La Garza, J M; Prateapusanond, A and Ambani, N (2007) Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11), pp. 836-845. ISSN 0733-9364

De La Garza-Rodriguez, J M (1988) A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

De Marco, A; Briccarello, D and Rafele, C (2009) Cost and schedule monitoring of industrial building projects: Case study. Journal of Construction Engineering and Management, 135(9), pp. 853-862. ISSN 0733-9364

Dehghan, R (2012) A new model, algorithm and computer tool to optimize overlapping of design activities in construction projects. PhD thesis, University of Calgary, Canada.

Deng, Zhong Ming (1995) Extended state space modelling and influence diagrams for construction processes and aids. PhD thesis, University of New South Wales, Australia.

Desgagné-Lebeuf, A; Lehoux, N and Beauregard, R (2022) Scheduling tools for the construction industry: Overview and decision support system for tool selection. International Journal of Construction Management, 22(14), pp. 2687-2698. ISSN 1562-3599

Dhanasekar, M (2000) Identification of optimal size resources for a repetitive housing construction. Engineering, Construction and Architectural Management, 7(4), pp. 347-361. ISSN 0969-9988

Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.

Dilger, W H; Tadros, G S and Giannelia, P (1992) Method proposed for construction of multispan cable-stayed bridges. Journal of Construction Engineering and Management, 118(2), pp. 273-282. ISSN 0733-9364

Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599

Doloi, H (2013) Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3), pp. 267-279. ISSN 0733-9364

Dorward, D R (2006) The effect of selected output modifications on facilitating the assessment of PDM schedules. PhD thesis, Indiana State University, USA.

Dou, Y; Zhong, L and Luo, L (2025) Supply chain resilience of prefabricated construction: Perspectives of stakeholder capabilities and vulnerabilities. Journal of Construction Engineering and Management, 151(4): 04025013, ISSN 0733-9364

Doulabi, S H H; Seifi, A and Shariat, S Y (2011) Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. ISSN 0733-9364

Driessen, M (2014) Asphalt encounters: Chinese road building in Ethiopia. PhD thesis, University of Oxford, UK.

Du, J; Xue, Y; Sugumaran, V; Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(4), pp. 1601-1635. ISSN 0969-9988

Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.

Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364

Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects. PhD thesis, Nottingham Trent University, UK.

Dzeng, R J and Tommelein, I D (1997) Boiler erection scheduling using product models and case-based reasoning. Journal of Construction Engineering and Management, 123(3), pp. 338-347. ISSN 0733-9364

Dzeng, R J; Tserng, H P and Wang, W C (2005) Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. ISSN 0733-9364

Dzeng, R J; Wang, W C and Tserng, H P (2004) Module-based construction schedule administration for public infrastructure agencies. Journal of Construction Engineering and Management, 130(1), pp. 5-14. ISSN 0733-9364

Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.

Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364

East, E W and Kim, S (1993) Standardizing scheduling data exchange. Journal of Construction Engineering and Management, 119(2), pp. 215-225. ISSN 0733-9364

East, E W and Liu, L Y (2006) Multiproject planning and resource controls for facility management. Journal of Construction Engineering and Management, 132(12), pp. 1294-1305. ISSN 0733-9364

Echeverry, D (1991) Factors for generating initial construction schedules. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Edwards, D J and Holt, G D (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(6), pp. 417-427. ISSN 0961-3218

Edwards, D J and Yisa, S (2001) Modelling the magnitude of plant downtime: A tool for improving plant operations management. Engineering, Construction and Architectural Management, 8(3), pp. 225-232. ISSN 0969-9988

Egebjerg, C (2013) Learning from movie-sets coordination. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Egger, H S (1986) Business techniques and skills utilized by small residential contractors with one to four employees in six high growth areas of Texas. EdD thesis, Texas A&M University, USA.

Eid, M S; Elbeltagi, E E and El-Adaway, I H (2021) Simultaneous multi-criteria optimization for scheduling linear infrastructure projects. International Journal of Construction Management, 21(1), pp. 41-55. ISSN 1562-3599

Eizak Shiri, F (2015) Planning intentionality and its implications for project planned time. PhD thesis, University of Manchester, UK.

El-Bibany, H (1997) Parametric constraint management in planning and scheduling: Computational basis. Journal of Construction Engineering and Management, 123(3), pp. 348-353. ISSN 0733-9364

El-Gohary, K M; Aziz, R F and Abdel-Khalek, H A (2017) Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8): 04017045, ISSN 0733-9364

El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.

El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364

El-Rayes, K and Jun, D H (2009) Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), pp. 1172-1180. ISSN 0733-9364

El-Rayes, K and Moselhi, O (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(4), pp. 433-446. ISSN 01446193

El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364

El-Rayes, K; Ramanathan, R and Moselhi, O (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), pp. 201-210. ISSN 01446193

El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.

El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(5), pp. 639-653. ISSN 0969-9988

El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.

El-Sersy, A H E (1992) An intelligent data model for schedule updating. PhD thesis, University of California, Berkeley, USA.

ElMenshawy, M and Marzouk, M (2021) Automated BIM schedule generation approach for solving time–cost trade-off problems. Engineering, Construction and Architectural Management, 28(10), pp. 3346-3367. ISSN 0969-9988

Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(2), pp. 199-211. ISSN 1466433X

Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364

Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387

Elazouni, A and Salem, O A (2011) Progress monitoring of construction projects using pattern recognition techniques. Construction Management and Economics, 29(4), pp. 355-370. ISSN 1466433X

Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364

Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364

Elazouni, A M and Metwally, F G (2007) Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), pp. 86-90. ISSN 0733-9364

Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988

Elbeltagi, E; Hegazy, T and Eldosouky, A (2004) Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130(4), pp. 534-541. ISSN 0733-9364

Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193

Eldin, N N (1991) Management of engineering/design phase. Journal of Construction Engineering and Management, 117(1), pp. 163-175. ISSN 0733-9364

Eldin, N N (1999) Impact of employee, management, and process issues on constructability implementation. Construction Management and Economics, 17(6), pp. 711-720. ISSN 01446193

Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175

Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364

Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(5), pp. 2106-2129. ISSN 0969-9988

Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.

Elliott, B R (2000) Investigation of the construction scheduling communication process: Problems, foreman's role, means of improvement and use of information technology. PhD thesis, University of Florida, USA.

Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.

Elmasry, M; Zayed, T and Hawari, A (2019) Multi-objective optimization model for inspection scheduling of sewer pipelines. Journal of Construction Engineering and Management, 145(2): 04018129, ISSN 0733-9364

Elzarka, H M and Bell, L C (1995) Object-oriented methodology for materials-management systems. Journal of Construction Engineering and Management, 121(4), pp. 438-445. ISSN 0733-9364

Emam, H (2021) Optimising project controls for construction using BIM and Big Data Analytics. PhD thesis, University of Bolton, UK.

Emam, H; Farrell, P and Ahmed, S (2016) Formulating a linear scheduling development index. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 188-198. ISSN 17514304

Emsoff, J E (1994) An object-oriented environment for the visual integration of project scheduling data. PhD thesis, Texas A&M University, USA.

Ensafi, Mahnaz (2022) Work order prioritization using neural networks to improve building operation. PhD thesis, Virginia Tech, USA.

Enshassi, A (1996) Materials control and waste on building sites. Building Research & Information, 24(1), pp. 31-34. ISSN 0961-3218

Ergen, E (2005) Formalization of life-cycle data management of engineered-to-order components using advanced tracking technologies. PhD thesis, Carnegie Mellon University, USA.

Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.

Esmaeili, B and Hallowell, M (2013) Integration of safety risk data with highway construction schedules. Construction Management and Economics, 31(6), pp. 528-541. ISSN 1466433X

Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. II: Predicting safety outcomes using generalized linear models. Journal of Construction Engineering and Management, 141(8): 04015022, ISSN 0733-9364

Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364

Ezzeddine, A; Shehab, L; Lucko, G and Hamzeh, F (2022) Forecasting construction project performance with momentum using singularity functions in LPS. Journal of Construction Engineering and Management, 148(8): 04022063, ISSN 0733-9364

Fahmie, M M (1994) A knowledge-based expert system approach to analyze and evaluate highway construction schedules. PhD thesis, Florida University, USA.

Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.

Fahmy, A; Hassan, T; Bassioni, H and McCaffer, R (2020) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 313-330. ISSN 2044-124X

Fan, C; Binchao, D and Yin, Y (2023) Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: An integrated ISM–MICMAC approach. Engineering, Construction and Architectural Management, 30(7), pp. 2991-3013. ISSN 0969-9988

Fan, S L (2012) Modified time impact analysis method. Journal of Construction Engineering and Management, 138(2), pp. 227-233. ISSN 0733-9364

Fan, S L and Tserng, H P (2006) Object-oriented scheduling for repetitive projects with soft logics. Journal of Construction Engineering and Management, 132(1), pp. 35-48. ISSN 0733-9364

Farahani, A; Wallbaum, H and Dalenbäck, J O (2019) Optimized maintenance and renovation scheduling in multifamily buildings: a systematic approach based on condition state and life cycle cost of building components. Construction Management and Economics, 37(3), pp. 139-155. ISSN 01446193

Farahani, A; Wallbaum, H and Dalenbäck, J O (2020) Cost-optimal maintenance and renovation planning in multifamily buildings with annual budget constraints. Journal of Construction Engineering and Management, 146(3): 04020009, ISSN 0733-9364

Farnsworth, C B; Beveridge, S; Miller, K R and Christofferson, J P (2015) Application, advantages, and methods associated with using BIM in commercial construction. International Journal of Construction Education and Research, 11(3), pp. 218-236. ISSN 1557-8771

Faubel, C.; Mowen, D.; Miri, M.; Demarquet Alban, U.; Martinez-Molina, A. and Alamaniotis, M. (2026) Multimodal transformer models for real-time estimation of indoor environmental quality in educational settings. Smart and Sustainable Built Environment, pp. 1-37. ISSN 2046-6099

Fazeli, A; Banihashemi, S; Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: The resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(5), pp. 1896-1922. ISSN 0969-9988

Fazlipour, M and Samadzad, M (2026) Engineering and economic feasibility of a new prefabrication ecosystem for steel construction in diverse low-rise residential buildings. Journal of Construction Engineering and Management, 152(2): 04025238, ISSN 0733-9364

Federico, D A; Berta, M; Bottero, M; Mallia, G and Morgese, V (2024) Multicriteria-decision support for master plan scheduling: Urban regeneration of an industrial area in Northern Italy. Construction Management and Economics, 42(5), pp. 476-501. ISSN 01446193

Fireman, M C T; Saurin, T A; Formoso, C T; Koskela, L and Tommelein, I D (2023) Slack in production planning and control: A study in the construction industry. Construction Management and Economics, 41(3), pp. 256-276. ISSN 01446193

Fischer, M A and Aalami, F B (1996) Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management, 122(4), pp. 337-347. ISSN 0733-9364

Fisher, D J and Rajan, N (1996) Automated constructibility analysis of work-zone traffic-control planning. Journal of Construction Engineering and Management, 122(1), pp. 36-43. ISSN 0733-9364

Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.

Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771

Ford, D N; Anderson, S D; Damron, A J; De Las Casas, R; Gokmen, N and Kuennen, S T (2004) Managing constructibility reviews to reduce highway project durations. Journal of Construction Engineering and Management, 130(1), pp. 33-42. ISSN 0733-9364

Francis, A (2013) The chronographical approach for construction project modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 188-204. ISSN 17514312

Francis, A (2016) A chronographic protocol for modelling construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 168-177. ISSN 17514304

Francis, A (2017) Simulating uncertainties in construction projects with chronographical scheduling logic. Journal of Construction Engineering and Management, 143(1): 04016085, ISSN 0733-9364

Francis, A; Bibai, J and Miresco, E (2013) Simulation of scheduling logic using dynamic functions. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 145-158. ISSN 17514312

Franco-Duran, D M and De La Garza, J M (2020) Performance of resource-constrained scheduling heuristics. Journal of Construction Engineering and Management, 146(4): 04020026, ISSN 0733-9364

Franco-Duran, D M and Garza, J M D L (2019) Review of resource-constrained scheduling algorithms. Journal of Construction Engineering and Management, 145(11): 03119006, ISSN 0733-9364

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Froese, T M (1992) Integrated computer-aided project management through standard object-oriented models. PhD thesis, Stanford University, USA.

Fu, Y (2019) Organizational governance and value creation: An empirical study in megaproject contexts. PhD thesis, University of Manchester, UK.

Fugar, F D K and Agyakwah-Baah, A B (2010) Delays in building construction projects in Ghana. Construction Economics and Building, 10(1-2), pp. 103-116. ISSN 2204-9029

Gajpal, Y and Elazouni, A (2015) Enhanced heuristic for finance-based scheduling of construction projects. Construction Management and Economics, 33(7), pp. 531-553. ISSN 01446193

Galloway, P D (2006) Comparative study of university courses on critical-path method scheduling. Journal of Construction Engineering and Management, 132(7), pp. 712-722. ISSN 0733-9364

Galloway, P D (2006) Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of Construction Engineering and Management, 132(7), pp. 697-711. ISSN 0733-9364

Gao, H; Zhang, L and Gu, S (2026) Carbon emission efficiency measurement of construction enterprises based on the three-stage DEA-sbm model. Journal of Construction Engineering and Management, 152(4): 04026028, ISSN 0733-9364

Gao, M Y; Han, J; Yang, Y; Tiong, R L K; Zhao, C and Han, C (2024) BIM-based and IoT-driven smart tracking for precast construction dynamic scheduling. Journal of Construction Engineering and Management, 150(9): 04024117, ISSN 0733-9364

Gao, W; Yan, X and Li, T (2024) Influencing factors and critical paths of virtual reality adoption by AEC enterprises based on TOE-SNA. Journal of Construction Engineering and Management, 150(2): 04023162, ISSN 0733-9364

Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.

Garriss, S (2008) Efficient, usable proof-construction strategies for distributed access-control systems. PhD thesis, Carnegie Mellon University, USA.

Geem, Z W (2010) Multiobjective optimization of time-cost trade-off using harmony search. Journal of Construction Engineering and Management, 136(6), pp. 711-716. ISSN 0733-9364

Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.

Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364

Georgy, M and Basily, S Y (2008) Using genetic algorithms in optimizing construction material delivery schedules. Construction Innovation, 8(1), pp. 23-45. ISSN 1471-4175

Gessford, G N (1966) An investigation of the utility of critical path time and cost analysis as an aid to budgeting and administrative control by construction firms. PhD thesis, University of California, Los Angeles, USA.

Ghadar, K O (2017) An examination of PERT implementation in the Libyan construction industry. PhD thesis, Cardiff Metropolitan University, UK.

Ghaffari, M (2017) The impact of multitasking on critical chain portfolios. PhD thesis, University of Manchester, UK.

Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.

Gil, N; Beckman, S and Tommelein, I (2008) Problem-solving base building under uncertainty and ambiguity: Multiple-case study on an airport expansion program. Journal of Construction Engineering and Management, 134(12), pp. 991-1001. ISSN 0733-9364

Goedert, J D and Sekpe, V D (2013) Decision support system-enhanced scheduling in matrix organizations using the analytic hierarchy process. Journal of Construction Engineering and Management, 139(11): 5013003, ISSN 0733-9364

Gomes, Helton Cristiano (2013) Multi-objective optimization algorithms for the activity sequencing problem in steel construction projects. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

González, P; González, V; Molenaar, K and Orozco, F (2014) Analysis of causes of delay and time performance in construction projects. Journal of Construction Engineering and Management, 140(1): 04013027, ISSN 0733-9364

González-Cruz, M C; Ballesteros-Pérez, P; Lucko, G and Zhang, J X (2022) Critical duration index: Anticipating project delays from deterministic schedule information. Journal of Construction Engineering and Management, 148(11): 04022121, ISSN 0733-9364

Gorse, C A; Bates, M and Hudson-Tyreman, A (2006) Practicalities of delay analysis: Retrospective analysis. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Gorse, C A; Ellis, R and Hudson-Tyreman, A (2005) Prospective delay analysis and adjudication. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Gould, C H (1988) Rolling fours: Novel work schedule. Journal of Construction Engineering and Management, 114(4), pp. 577-593. ISSN 0733-9364

Grau, D and Back, W E (2015) Predictability index: Novel metric to assess cost and schedule performance. Journal of Construction Engineering and Management, 141(12): 04015043, ISSN 0733-9364

Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193

Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X

Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193

Gunduz, M (2002) Change orders impact assessment for labor intensive construction. PhD thesis, University of Wisconsin - Madison, USA.

Guo, S J (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4), pp. 287-295. ISSN 0733-9364

Gurgun, A P; Koc, K and Kunkcu, H (2024) Exploring the adoption of technology against delays in construction projects. Engineering, Construction and Architectural Management, 31(3), pp. 1222-1253. ISSN 0969-9988

Gwak, H S; Son, S H; Park, Y J and Lee, D E (2016) Exact time-cost tradeoff analysis in concurrency-based scheduling. Journal of Construction Engineering and Management, 142(10): 04016054, ISSN 0733-9364

Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364

Haas, T C; Rodriguez, A M; Glover, R and Goodrum, P M (2001) Implementing a multiskilled workforce. Construction Management and Economics, 19(6), pp. 633-641. ISSN 01446193

Hadipriono, F C; Lim, C L and Wong, K H (1986) Event tree analysis to prevent failures in temporary structures. Journal of Construction Engineering and Management, 112(4), pp. 500-513. ISSN 0733-9364

Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.

Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hajibabai, L; Aziz, Z and Peña-Mora, F (2011) Visualizing greenhouse gas emissions from construction activities. Construction Innovation, 11(3), pp. 356-370. ISSN 1471-4175

Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175

Halabya, A and El-Rayes, K (2020) Optimizing the planning of pedestrian facilities upgrade projects to maximize accessibility for people with disabilities. Journal of Construction Engineering and Management, 146(1): 04019088, ISSN 0733-9364

Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007

Hammad, A W; Grzybowska, H; Sutrisna, M; Akbarnezhad, A and Haddad, A (2020) A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Construction Management and Economics, 38(6), pp. 534-551. ISSN 01446193

Hammad, M W; Abbasi, A and Ryan, M J (2018) Developing a novel framework to manage schedule contingency using theory of constraints and earned schedule method. Journal of Construction Engineering and Management, 144(4): 04018011, ISSN 0733-9364

Hammad, Mohammed (2018) Estimating, allocating and managing schedule and cost contingency in construction projects. PhD thesis, University of New South Wales, Australia.

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Han, Bing (2022) Implementing virtual reality-based design review in the construction industry. PhD thesis, University of Texas at Austin, USA.

Handa, V K and Barcia, R M (1986) Linear scheduling using optimal control theory. Journal of Construction Engineering and Management, 112(3), pp. 387-393. ISSN 0733-9364

Handa, V K and Rivers, D (1983) Downgrading construction incidents. Journal of Construction Engineering and Management, 109(2), pp. 190-205. ISSN 0733-9364

Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364

Hanna, A S; Chang, C K; Lackney, J A and Sullivan, K T (2007) Impact of overmanning on mechanical and sheet metal labor productivity. Journal of Construction Engineering and Management, 133(1), pp. 22-28. ISSN 0733-9364

Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364

Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364

Harding, A M (1999) A global approach to project optimisation. PhD thesis, University of Edinburgh, UK.

Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control. PhD thesis, Iowa State University, USA.

Harmelink, D J (2001) Linear scheduling model: Float characteristics. Journal of Construction Engineering and Management, 127(4), pp. 255-260. ISSN 0733-9364

Harmelink, D J and Rowings, J E (1998) Linear scheduling model: Development of controlling activity path. Journal of Construction Engineering and Management, 124(4), pp. 263-268. ISSN 0733-9364

Harris, R A and Scott, S (2001) UK practice in dealing with claims for delay. Engineering, Construction and Architectural Management, 8(5-6), pp. 317-324. ISSN 0969-9988

Harris, R B (1990) Packing method for resource leveling (PACK). Journal of Construction Engineering and Management, 116(2), pp. 331-350. ISSN 0733-9364

Harris, R B and Ioannou, P G (1998) Scheduling projects with repeating activities. Journal of Construction Engineering and Management, 124(4), pp. 269-278. ISSN 0733-9364

Hartmann, T and Fischer, M (2007) Supporting the constructability review with 3D/4D models. Building Research & Information, 35(1), pp. 70-80. ISSN 0961-3218

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988

Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364

Hasan, M and Lu, M (2024) Mitigating project schedule risks by identifying subcritical paths and variance-critical activities. Journal of Construction Engineering and Management, 150(8): 04024096, ISSN 0733-9364

Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(6), pp. 515-533. ISSN 01446193

Hassan, A; El-Rayes, K and Attalla, M (2021) Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 28(6), pp. 1615-1634. ISSN 0969-9988

Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassanein, A (2003) Planning and scheduling highway construction using GIS and dynamic programming. PhD thesis, Concordia University, Canada.

Hassanein, A and Moselhi, O (2004) Planning and scheduling highway construction. Journal of Construction Engineering and Management, 130(5), pp. 638-646. ISSN 0733-9364

Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193

Hassanein, A A G and Melin, J W (1996) Time constraints set by prime contractors for their sub-contractors. Building Research & Information, 24(5), pp. 293-301. ISSN 0961-3218

Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2007) Project manager's decision aid for a radical project cycle reduction. Journal of Construction Engineering and Management, 133(6), pp. 437-446. ISSN 0733-9364

Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2008) Analysis of techniques leading to radical reduction in project cycle time. Journal of Construction Engineering and Management, 134(12), pp. 915-927. ISSN 0733-9364

He, C (2022) Integrate human and engineering aspects to facilitate construction scheduling under uncertainty. PhD thesis, North Carolina State University, USA.

He, C; Liu, M; Alves, T D C L; Scala, N M and Hsiang, S M (2022) Prioritizing collaborative scheduling practices based on their impact on project performance. Construction Management and Economics, 40(7-8), pp. 618-637. ISSN 01446193

Heaton, R; Martin, H; Chadee, A; Milling, A; Dunne, S and Borthwick, F (2022) The construction materials conundrum: Practical solutions to address integrated supply chain complexities. Journal of Construction Engineering and Management, 148(8): 04022071, ISSN 0733-9364

Heesom, D (2004) An analytical system for space planning on construction sites. PhD thesis, University of Wolverhampton, UK.

Hegab, M and Smith, G R (2009) Labor performance analysis for microtunneling projects. Journal of Construction Engineering and Management, 135(5), pp. 432-435. ISSN 0733-9364

Hegazy, T (2006) Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132(1), pp. 26-34. ISSN 0733-9364

Hegazy, T; Abdel-Monem, M and Saad, D A (2014) Framework for enhanced progress tracking and control of linear projects. Engineering, Construction and Architectural Management, 21(1), pp. 94-110. ISSN 0969-9988

Hegazy, T; Abdel-Monem, M; Saad, D A and Rashedi, R (2013) Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139(9), pp. 1135-1143. ISSN 0733-9364

Hegazy, T; Elbeltagi, E and Zhang, K (2005) Keeping better site records using intelligent bar charts. Journal of Construction Engineering and Management, 131(5), pp. 513-521. ISSN 0733-9364

Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364

Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364

Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364

Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364

Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364

Hegazy, T and Menesi, W (2010) Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136(10), pp. 1078-1085. ISSN 0733-9364

Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364

Hegazy, T and Petzold, K (2003) Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129(4), pp. 396-404. ISSN 0733-9364

Hegazy, T; Saad, D A and Mostafa, K (2020) Enhanced repetitive-scheduling computation and visualization. Journal of Construction Engineering and Management, 146(10): 04020118, ISSN 0733-9364

Hegazy, T; Shabeeb, A K; Elbeltagi, E and Cheema, T (2000) Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126(6), pp. 414-421. ISSN 0733-9364

Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364

Hegazy, T and Zhang, K (2005) Daily windows delay analysis. Journal of Construction Engineering and Management, 131(5), pp. 505-512. ISSN 0733-9364

Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.

Heineck, L F (1983) On the analyses of activity durations on three house building sites. PhD thesis, University of Leeds, UK.

Hejducki, Z and Mrozowicz, J (2001) Stream methods of construction work organization: An introduction to the problem. Engineering, Construction and Architectural Management, 8(2), pp. 80-89. ISSN 0969-9988

Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364

Hendrickson, Thomas Peter (2013) Carbon and water resource management for water distribution systems. PhD thesis, University of California, USA.

Heravi, G; Kebria, M F and Rostami, M (2021) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(1), pp. 174-195. ISSN 0969-9988

Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X

Herbsman, Z (1986) SERC: A model for estimating construction inputs. Journal of Construction Engineering and Management, 112(3), pp. 425-439. ISSN 0733-9364

Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193

Hide, G (2010) Managing a programme under the NEC3 ECC contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 111-119. ISSN 17514312

Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.

Hinze, J and Raboud, P (1988) Safety on large building construction projects. Journal of Construction Engineering and Management, 114(2), pp. 286-293. ISSN 0733-9364

Hiyassat, M A S (2000) Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4), pp. 278-284. ISSN 0733-9364

Hollister, K C (1992) An extended structured query language incorporating object data types for the construction industry. PhD thesis, University of Florida, USA.

Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364

Hong, Y; Xie, H; Agapaki, E and Brilakis, I (2023) Graph-based automated construction scheduling without the use of BIM. Journal of Construction Engineering and Management, 149(2): 05022020, ISSN 0733-9364

Hooper, M (2015) BIM anatomy II: Standardisation needs & support systems. PhD thesis, Lund University, Sweden.

Hooper, M (2015) Automated model progression scheduling using level of development. Construction Innovation, 15(4), pp. 428-448. ISSN 1471-4175

Horsthuis, C (2016) The importance of organisational slack as an unexplored determinant of firm level innovation and performance in the construction context. PhD thesis, Loughborough University, UK.

Horsthuis, C; Thomson, D S and Fernie, S (2012) The case for slack to promote innovative behaviour in construction firms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Hosny, O A (1991) An intelligent decision support system for construction planning and scheduling. PhD thesis, University of Missouri - Rolla, USA.

Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.

Hou, X; Zeng, Y and Xue, J (2020) Detecting structural components of building engineering based on deep-learning method. Journal of Construction Engineering and Management, 146(2): 04019097, ISSN 0733-9364

Householder, J L and Rutland, H E (1990) Who owns float? Journal of Construction Engineering and Management, 116(1), pp. 130-133. ISSN 0733-9364

Howell, G A; Ballard, G and Tommelein, I (2011) Construction engineering-reinvigorating the discipline. Journal of Construction Engineering and Management, 137, pp. 740-744. ISSN 0733-9364

Hsu, P Y; Aurisicchio, M; Angeloudis, P and Whyte, J (2020) Understanding and visualizing schedule deviations in construction projects using fault tree analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2501-2522. ISSN 0969-9988

Hu, C and Liu, D (2018) Improved critical path method with trapezoidal fuzzy activity durations. Journal of Construction Engineering and Management, 144(9): 04018090, ISSN 0733-9364

Hu, D and Mohamed, Y (2014) Simulation-model-structuring methodology for industrial construction fabrication shops. Journal of Construction Engineering and Management, 140(5): 04014002, ISSN 0733-9364

Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193

Hu, X and Liu, C (2017) Slacks-based data envelopment analysis for eco-efficiency assessment in the Australian construction industry. Construction Management and Economics, 35(11-12), pp. 693-706. ISSN 01446193

Hu, Xiancun (2015) Construction industry performance measurement with carbon reduction. PhD thesis, Deakin University, Australia.

Huang, J; Ji, A; Xiao, Z and Zhang, L (2025) Schedule-cost optimization in high-rise buildings considering uncertainty. Engineering, Construction and Architectural Management, 32(9), pp. 5657-5681. ISSN 0969-9988

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.

Huang, R Y and Halpin, D W (2000) Graphically based lp modelling for linear scheduling analysis: The polo system. Engineering, Construction and Architectural Management, 7(1), pp. 41-51. ISSN 0969-9988

Huang, R Y and Sun, K S (2006) Non-unit-based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6), pp. 585-597. ISSN 0733-9364

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175

Huang, Y C (2006) Graphical-based multistage scheduling method for RC buildings. Construction Management and Economics, 24(1), pp. 5-18. ISSN 01446193

Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.

Hummer, J E; Arocho, I and Rasdorf, W (2017) Approach to assessing tradeoffs between construction equipment fleet emissions and cost. Journal of Construction Engineering and Management, 143(5): 04016122, ISSN 0733-9364

Hunter, K and Kelly, J (2004) Value management workshops and partnering conundrums. Journal of Construction Procurement, 10(1),

Hurtado, K (2018) An andragogically-centered schema for a heuristic approach to post-collegiate development in the built environment. PhD thesis, Arizona State University, USA.

Hussain, M B (1993) Constraint-based construction project scheduling. PhD thesis, Carnegie Mellon University, USA.

Hutchings, D M and Christofferson, J P (2004) Management practices of residential construction companies producing 25 or fewer units annually. International Journal of Construction Education and Research, 1(1), pp. 34-44. ISSN 1557-8771

Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X

Hymes, S J (2010) Front end specifications and the propagation of construction claims. DSc thesis, Washington University in St. Louis, USA.

Hymes, S J (2011) Front-end specifications and construction claims. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 139-146. ISSN 17514312

Hübner, F; Volk, R; Kühlen, A and Schultmann, F (2017) Review of project planning methods for deconstruction projects of buildings. Built Environment Project and Asset Management, 7(2), pp. 212-226. ISSN 2044-124X

Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364

Ibbs, W and Nguyen, L D (2007) Alternative for quantifying field-overhead damages. Journal of Construction Engineering and Management, 133(10), pp. 736-742. ISSN 0733-9364

Ibbs, W and Nguyen, L D (2007) Schedule analysis under the effect of resource allocation. Journal of Construction Engineering and Management, 133(2), pp. 131-138. ISSN 0733-9364

Ibn Majdoub Hassani, Z; El Barkany, A; Jabri, A; El Abbassi, I and Darcherif, A M (2020) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology, 18(1), pp. 172-189. ISSN 1726-0531

Igwe, C; Nasiri, F and Hammad, A (2022) Construction workspace management: Critical review and roadmap. International Journal of Construction Management, 22(10), pp. 1960-1973. ISSN 1562-3599

Igwe, C; Nasiri, F and Hammad, A (2022) An empirical study on non-physical waste factors in the construction industry. Engineering, Construction and Architectural Management, 29(10), pp. 4088-4106. ISSN 0969-9988

Ilozor, B D and Ilozor, D B (2006) Open-planning concepts and effective facilities management of commercial buildings. Engineering, Construction and Architectural Management, 13(4), pp. 396-412. ISSN 0969-9988

Ingirige, B and Sexton, M (2006) Alliances in construction: Investigating initiatives and barriers for long-term collaboration. Engineering, Construction and Architectural Management, 13(5), pp. 521-535. ISSN 0969-9988

Ioannou, P G and Yang, I T (2016) Repetitive scheduling method: Requirements, modeling, and implementation. Journal of Construction Engineering and Management, 142(5): 04016002, ISSN 0733-9364

Ipsilandis, P G (2007) Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management, 133(6), pp. 417-424. ISSN 0733-9364

Iranagh, M A and Sonmez, R (2012) A genetic algorithm for resource levelling of construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Isidore, L J (1999) Integrated range estimating and probabilistic scheduling of construction projects. PhD thesis, Texas A&M University, USA.

Isidore, L J and Back, W E (2001) Probabilistic optimal-cost scheduling. Journal of Construction Engineering and Management, 127(6), pp. 431-437. ISSN 0733-9364

Isidore, L J and Back, W E (2002) Multiple simulation analysis for probabilistic cost and schedule integration. Journal of Construction Engineering and Management, 128(3), pp. 211-219. ISSN 0733-9364

Isidore, L J; Back, W E and Fry, G T (2001) Integrated probabilistic schedules and estimates from project simulated data. Construction Management and Economics, 19(4), pp. 417-426. ISSN 01446193

Iyer, K C and Jha, K N (2003) Analysis of critical coordination activities of Indian construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Iyer, K C and Jha, K N (2006) Critical factors affecting schedule performance: Evidence from Indian construction projects. Journal of Construction Engineering and Management, 132(8), pp. 871-881. ISSN 0733-9364

Jaafari, A (1984) Criticism of CPM for project planning analysis. Journal of Construction Engineering and Management, 110(2), pp. 222-233. ISSN 0733-9364

Jaafari, A; Manivong, K K and Chaaya, M (2001) Vircon: Interactive system for teaching construction management. Journal of Construction Engineering and Management, 127(1), pp. 66-75. ISSN 0733-9364

Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.

Jagannathan, M and Delhi, V S K (2023) Paths leading contractual disputes to litigation. Built Environment Project and Asset Management, 13(6), pp. 846-861. ISSN 2044-124X

Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599

Javed, N; Thaheem, M J; Bakhtawar, B; Nasir, A R; Khan, K I A and Gabriel, H F (2020) Managing risk in green building projects: Toward a dedicated framework. Smart and Sustainable Built Environment, 9(2), pp. 156-173. ISSN 2046-6099

Jaśkowski, P and Sobotka, A (2006) Scheduling construction projects using evolutionary algorithm. Journal of Construction Engineering and Management, 132(8), pp. 861-870. ISSN 0733-9364

Jeong, K S; Lu, S L and Sexton, M G (2010) Good practice transfer within small construction specialist trade contractors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(4), pp. 409-421. ISSN 1466433X

Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364

Jiang, Y and Wu, H (2007) A method for highway agency to estimate highway construction durations and set contract times. International Journal of Construction Education and Research, 3(3), pp. 199-216. ISSN 1557-8771

Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988

Jin, R; Zuo, J and Hong, J (2019) Scientometric review of articles published in ASCE's journal of construction engineering and management from 2000 to 2018. Journal of Construction Engineering and Management, 145(8): 06019001, ISSN 0733-9364

Joannides, M M; Olbina, S and Issa, R R A (2012) Implementation of building information modeling into accredited programs in architecture and construction education. International Journal of Construction Education and Research, 8(2), pp. 83-100. ISSN 1557-8771

John, G (2007) Assessment of the use of resource scheduling facilities in project management software packages for large contractors. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402-411. ISSN 1562-3599

Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.

Jordan Srour, F; Kiomjian, D and Srour, I M (2018) Automating the use of learning curve models in construction task duration estimates. Journal of Construction Engineering and Management, 144(7): 04018055, ISSN 0733-9364

Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364

Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364

Jung, Y and Kang, S (2007) Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management, 133(1), pp. 10-21. ISSN 0733-9364

Jung, Y and Woo, S (2004) Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management, 130(5), pp. 616-625. ISSN 0733-9364

Kadry, M; Osman, H and Georgy, M (2017) Causes of construction delays in countries with high geopolitical risks. Journal of Construction Engineering and Management, 143(2): 04016095, ISSN 0733-9364

Kaewmoracharoen, M (2009) Feasibility of visualization and simulation applications to improve work zone safety and mobility. PhD thesis, Iowa State University, USA.

Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988

Kalach, M; Abdul-Malak, M A and Srour, I (2021) Design information release under alternative design-construction modes. Engineering, Construction and Architectural Management, 28(4), pp. 969-993. ISSN 0969-9988

Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.

Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(3), pp. 211-222. ISSN 0969-9988

Kallantzis, A; Soldatos, J and Lambropoulos, S (2007) Linear versus network scheduling: A critical path comparison. Journal of Construction Engineering and Management, 133(7), pp. 483-491. ISSN 0733-9364

Kamat, V R; Martinez, J C; Fischer, M; Golparvar-Fard, M; Pea-Mora, F and Savarese, S (2011) Research in visualization techniques for field construction. Journal of Construction Engineering and Management, 137, pp. 853-862. ISSN 0733-9364

Kanagasabapathi, B and Ananthanarayanan, K (2005) A simulation model for resource constrained scheduling of multiple projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Kandil, A and El-Rayes, K (2006) Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. Journal of Construction Engineering and Management, 132(5), pp. 491-498. ISSN 0733-9364

Kang, H-Y (2001) Web-based four-dimensional visualization for constuction scheduling. PhD thesis, Texas A&M University, USA.

Kang, J H; Anderson, S D and Clayton, M J (2007) Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling. Journal of Construction Engineering and Management, 133(6), pp. 447-461. ISSN 0733-9364

Kang, L S; Park, I C and Lee, B H (2001) Optimal schedule planning for multiple, repetitive construction process. Journal of Construction Engineering and Management, 127(5), pp. 382-390. ISSN 0733-9364

Kang, L S and Paulson, B C (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management, 124(5), pp. 381-389. ISSN 0733-9364

Kanit, R; Gunduz, M and Ozkan, O (2009) Investigating the effectiveness of certain priority rules on resource scheduling of housing estate projects. Journal of Construction Engineering and Management, 135(7), pp. 609-613. ISSN 0733-9364

Kannimuthu, M; Raphael, B; Ekambaram, P and Kuppuswamy, A (2020) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(4), pp. 893-916. ISSN 0969-9988

Kanoglu, A and Arditi, D (2001) A computer-based information system for architectural design offices. Construction Innovation, 1(1), pp. 15-29. ISSN 1471-4175

Karaa, F A and Nasr, A Y (1986) Resource management in construction. Journal of Construction Engineering and Management, 112(3), pp. 346-357. ISSN 0733-9364

Karami, H and Olatunji, O A (2019) Key value engineering protocols in marine projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 21-31. ISSN 17514304

Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(7), pp. 1579-1594. ISSN 0969-9988

Karhu, V (2001) A generic construction process modelling method. PhD thesis, KTH Royal Institute of Technology, Sweden.

Karim, A and Adeli, H (1999) A new generation software for construction scheduling and management. Engineering, Construction and Architectural Management, 6(4), pp. 380-390. ISSN 0969-9988

Karim, A and Adeli, H (1999) OO information model for construction project management. Journal of Construction Engineering and Management, 125(5), pp. 361-367. ISSN 0733-9364

Karni, R (1987) A systematic approach to stochastic scheduling. Construction Management and Economics, 5(3), pp. 187-198. ISSN 01446193

Karpen, S (2013) The role of task openness in forming completion time estimates. PhD thesis, Indiana University, USA.

Karshenas, S (1981) Probabilistic evaluation of safety of buildings during construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193

Kartam, N A (1997) Integrating safety and health performance into construction CPM. Journal of Construction Engineering and Management, 123(2), pp. 121-126. ISSN 0733-9364

Kartam, N A-F (1989) Investigating the utility of artificial intelligence techniques for automatic generation of construction project plans. PhD thesis, Stanford University, USA.

Karumanasseri, G and Abourizk, S (2002) Decision support system for scheduling steel fabrication projects. Journal of Construction Engineering and Management, 128(5), pp. 392-399. ISSN 0733-9364

Kataoka, M (2008) Automated generation of construction plans from primitive geometries. Journal of Construction Engineering and Management, 134(8), pp. 592-600. ISSN 0733-9364

Katsimpalis, E; Adey, B T and Haas, C T (2026) Automatically transforming virtual realitysimulations into project schedules. Journal of Construction Engineering and Management, 152(6): 04026059, ISSN 0733-9364

Katsuragawa, C M; Lucko, G; Isaac, S and Su, Y (2021) Fuzzy linear and repetitive scheduling for construction projects. Journal of Construction Engineering and Management, 147(3): 04021002, ISSN 0733-9364

Kauffold, P V (1977) Critical resource allocation in stochastic project networks. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.

Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.

Keeter, E H (1985) The development of a task inventory for baccalaureate programs in construction management (education, curriculum). PhD thesis, Texas A&M University, USA.

Khalili, A (2013) An IFC-based framework for optimizing level of prefabrication in industrialized building systems. PhD thesis, National University of Singapore, Singapore.

Khallaf, Z; Alshibani, A; Alsawafy, O; Mohammed, A and Bubshait, A (2024) Dynamic fleet configuration model for optimizing earthmoving operations using mixed integer linear programming. Journal of Construction Engineering and Management, 150(11): 04024152, ISSN 0733-9364

Khamooshi, H and Cioffi, D F (2013) Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling. Journal of Construction Engineering and Management, 139(5), pp. 488-497. ISSN 0733-9364

Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.

Khodakarami, V (2009) Applying Bayesian networks to model uncertainty in project scheduling. PhD thesis, Queen Mary University of London, UK.

Kidd, A; Appelbe, S and Morgan, A (2015) The use and abuse of programmes in construction contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 294-301. ISSN 17514304

Kim, B C (2007) Forecasting project progress and early warning of project overruns with probabilistic methods. PhD thesis, Texas A&M University, USA.

Kim, B C and Reinschmidt, K F (2009) Probabilistic forecasting of project duration using bayesian inference and the beta distribution. Journal of Construction Engineering and Management, 135(3), pp. 178-186. ISSN 0733-9364

Kim, B C and Reinschmidt, K F (2010) Probabilistic forecasting of project duration using Kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), pp. 834-843. ISSN 0733-9364

Kim, H; Orr, K; Shen, Z; Moon, H; Ju, K and Choi, W (2014) Highway alignment construction comparison using object-oriented 3D visualization modeling. Journal of Construction Engineering and Management, 140(10): 05014008, ISSN 0733-9364

Kim, J (2004) Delay forecasting using a vulnerability index. PhD thesis, Purdue University, USA.

Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.

Kim, J L (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics, 31(1), pp. 3-19. ISSN 1466433X

Kim, J L and Ellis, R D (2010) Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm. Journal of Construction Engineering and Management, 136(2), pp. 160-169. ISSN 0733-9364

Kim, J L and Ellis Jr, R D (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling. Journal of Construction Engineering and Management, 134(11), pp. 904-913. ISSN 0733-9364

Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.

Kim, K (2002) Distributed coordination of project schedule changes: An agent-based compensatory negotiation approach. PhD thesis, Stanford University, USA.

Kim, K (2003) A resource-constrained CPM (RCPM) scheduling and control technique with multiple calendars. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kim, K and De La Garza, J M (2003) Phantom float. Journal of Construction Engineering and Management, 129(5), pp. 507-517. ISSN 0733-9364

Kim, K and De La Garza, J M (2005) Critical path method with multiple calendars. Journal of Construction Engineering and Management, 131(3), pp. 330-342. ISSN 0733-9364

Kim, K and De La Garza, J M (2005) Evaluation of the resource-constrained critical path method algorithms. Journal of Construction Engineering and Management, 131(5), pp. 522-532. ISSN 0733-9364

Kim, T; Lim, H; Cho, H and Kang, K I (2014) Automated lifting system integrated with construction hoists for table formwork in tall buildings. Journal of Construction Engineering and Management, 140(10): 04014049, ISSN 0733-9364

Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.

Klanšek, U (2016) Mixed-integer nonlinear programming model for nonlinear discrete optimization of project schedules under restricted costs. Journal of Construction Engineering and Management, 142(3): 04015088, ISSN 0733-9364

Koch, C and Bendixen, M (2005) Multiple perspectives on organizing: Projects between tyranny and perforation. Building Research & Information, 33(6), pp. 536-546. ISSN 0961-3218

Kodikara, G W; Thorpe, A and McCaffer, R (1993) The use of bills of quantities in building contractor organizations. Construction Management and Economics, 11(4), pp. 261-269. ISSN 01446193

Koehn, E (1975) Probabilistic system for project management. PhD thesis, Wayne State University, USA.

Koehn, E and Caplan, S B (1987) Work improvement data for small and medium size contractors. Journal of Construction Engineering and Management, 113(2), pp. 327-339. ISSN 0733-9364

Kokkaew, N (2010) Risk flexibility analysis in infrastructure project finance. PhD thesis, Columbia University, USA.

Kokkaew, N and Chiara, N (2010) Modelling completion risk using stochastic critical path-envelope method: A BOT highway project application. Construction Management and Economics, 28(12), pp. 1239-1254. ISSN 1466433X

Kong, F and Dou, D (2020) RCPSP with combined precedence relations and resource calendars. Journal of Construction Engineering and Management, 146(12): 04020133, ISSN 0733-9364

Kong, F and Dou, D (2021) Resource-constrained project scheduling problem under multiple time constraints. Journal of Construction Engineering and Management, 147(2): 04020170, ISSN 0733-9364

Kong, F; Guo, J and Lv, X (2021) Project resource input optimization problem with combined time constraints based on node network diagram and constraint programming. Journal of Construction Engineering and Management, 147(12): 2192, ISSN 0733-9364

Koo, B (2004) Formalizing construction sequence constraints for the rapid generation of scheduling alternatives. PhD thesis, Stanford University, USA.

Koo, D H and Ariaratnam, S T (2008) Application of a sustainability model for assessing water main replacement options. Journal of Construction Engineering and Management, 134(8), pp. 563-574. ISSN 0733-9364

Koo, K-J (2000) Organizational program management for multiple maintenance projects under multi-trade capacity constraints. PhD thesis, University of Wisconsin - Madison, USA.

Koseoglu, O; Sakin, M and Arayici, Y (2018) Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project. Engineering, Construction and Architectural Management, 25(10), pp. 1339-1354. ISSN 0969-9988

Koulinas, G K and Anagnostopoulos, K P (2012) Construction resource allocation and leveling using a threshold accepting-based hyperheuristic algorithm. Journal of Construction Engineering and Management, 138(7), pp. 854-863. ISSN 0733-9364

Koushki, P A and Kartam, N (2004) Impact of construction materials on project time and cost in Kuwait. Engineering, Construction and Architectural Management, 11(2), pp. 126-132. ISSN 0969-9988

Kuo, S-F (1995) Decision support for irrigated project planning using a genetic algorithm. PhD thesis, Utah State University, USA.

Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.

Kuttantharappel Soman, R (2020) Automated look-ahead schedule generation using linked-data based constraint checking for construction projects. PhD thesis, Imperial College London, UK.

Kähkönen, K E E (1993) Modelling activity dependencies for building construction project scheduling. PhD thesis, University of Reading, UK.

Laishram, B and Sood, R (2024) Challenges in implementation of 7D-BIM for infrastructure asset management: A systematic review. Construction Economics and Building, 24(3), pp. 95-117. ISSN 2204-9029

Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193

Lam, Y T (1995) A knowledge-based system for planning and scheduling ready-mixed concrete. PhD thesis, Loughborough University, UK.

Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.

Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.

Laufer, A; Shapira, A and Goren, I (1998) Implementing an integrative approach to project schedule compression. Engineering, Construction and Architectural Management, 5(1), pp. 82-92. ISSN 0969-9988

Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599

Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364

Leandro, R; O'Connor, J T and Khwaja, N (2018) Development and application of a production-rate resource for contract time determination. Journal of Construction Engineering and Management, 144(12): 06018005, ISSN 0733-9364

Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304

Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364

Lee, D E and Arditi, D (2006) Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), pp. 268-277. ISSN 0733-9364

Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364

Lee, E B (2000) Constructability and productivity analysis for long life pavement rehabilitation strategies (LLPRS). PhD thesis, University of California, Berkeley, USA.

Lee, E B; Harvey, J T and Thomas, D (2005) Integrated design/construction/operations analysis for fast-track urban freeway reconstruction. Journal of Construction Engineering and Management, 131(12), pp. 1283-1291. ISSN 0733-9364

Lee, E B and Ibbs, C W (2005) Computer simulation model: Construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering and Management, 131(4), pp. 449-458. ISSN 0733-9364

Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364

Lee, J (2008) Dynamic project management methodology: Managing schedule compression. PhD thesis, University of Florida, USA.

Lee, J and Hyun, H (2019) Multiple modular building construction project scheduling using genetic algorithms. Journal of Construction Engineering and Management, 145(1): 04018116, ISSN 0733-9364

Lee, J; Park, M; Lee, H S and Hyun, H (2019) Classification of modular building construction projects based on schedule-driven approach. Journal of Construction Engineering and Management, 145(5): 04019031, ISSN 0733-9364

Lee, S; Peña-Mora, F and Park, M (2005) Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, 131(8), pp. 890-902. ISSN 0733-9364

Lee, S; Peña-Mora, F and Park, M (2006) Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects. Journal of Construction Engineering and Management, 132(5), pp. 452-464. ISSN 0733-9364

Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.

Lerche, J; Neve, H H; Ballard, G; Teizer, J; Wandahl, S and Gross, A (2020) Application of last planner system to modular offshore wind construction. Journal of Construction Engineering and Management, 146(11): 05020015, ISSN 0733-9364

Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193

Leu, S S and Hwang, S T (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, 127(4), pp. 270-280. ISSN 0733-9364

Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364

Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193

Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364

Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.

Li, D and Lu, M (2017) Automated generation of work breakdown structure and project network model for earthworks project planning: A flow network-based optimization approach. Journal of Construction Engineering and Management, 143(1): 04016086, ISSN 0733-9364

Li, H; Chan, G; Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(5), pp. 536-550. ISSN 0969-9988

Li, H and Love, P (1997) Using improved genetic algorithms to facilitate time-cost optimization. Journal of Construction Engineering and Management, 123(3), pp. 233-237. ISSN 0733-9364

Li, H; Wang, M and Dong, X (2019) Resource leveling in projects with stochastic minimum time lags. Journal of Construction Engineering and Management, 145(4): 04019015, ISSN 0733-9364

Li, H; Xu, Z and Demeulemeester, E (2015) Scheduling policies for the stochastic resource leveling problem. Journal of Construction Engineering and Management, 141(2): 04014072, ISSN 0733-9364

Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364

Li, Q; Jiang, M; Tao, S; Hao, J and Chong, H Y (2023) The integrated problem of construction project scheduling and multiskilled staff assignment with learning effect. Journal of Construction Engineering and Management, 149(8): 04023064, ISSN 0733-9364

Li, Q; Sun, Q; Tao, S and Gao, X (2020) Multi-skill project scheduling with skill evolution and cooperation effectiveness. Engineering, Construction and Architectural Management, 27(8), pp. 2023-2045. ISSN 0969-9988

Li, R and Roberti, R (2017) Optimal scheduling of railway track possessions in large-scale projects with multiple construction works. Journal of Construction Engineering and Management, 143(6): 04017007, ISSN 0733-9364

Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.

Li, Y (2023) Integrated multi-stage decision-support for enhanced infrastructure restoration under uncertainty. PhD thesis, George Mason University, USA.

Li, Y; Lu, Y; Li, D and Ma, L (2015) Metanetwork analysis for project task assignment. Journal of Construction Engineering and Management, 141(12): 04015044, ISSN 0733-9364

Li, Y; Zhang, L; Liu, X and Li, X (2025) A project scheduling optimization model for reducing construction dust emissions based on variability in meteorological conditions. Journal of Construction Engineering and Management, 151(11): 04025171, ISSN 0733-9364

Liberatore, M J; Pollack-Johnson, B and Smith, C A (2001) Project management in construction: Software use and research directions. Journal of Construction Engineering and Management, 127(2), pp. 101-107. ISSN 0733-9364

Lin, K L and Haas, C T (1996) Multiple heavy lifts optimization. Journal of Construction Engineering and Management, 122(4), pp. 354-362. ISSN 0733-9364

Lindhard, S and Wandahl, S (2014) Exploration of the reasons for delays in construction. International Journal of Construction Management, 14(1), pp. 36-44. ISSN 1562-3599

Lindhard, S M; Neve, H; Terje Kalsaas, B; Møller, D E and Wandahl, S (2022) Ranking and comparing key factors causing time-overruns in on-site construction. International Journal of Construction Management, 22(14), pp. 2724-2730. ISSN 1562-3599

Lindén, S and Josephson, P E (2013) In-housing or out-sourcing on-site materials handling in housing? Journal of Engineering, Design and Technology, 11(1), pp. 90-106. ISSN 1726-0531

Lingard, H; Brown, K; Bradley, L; Bailey, C and Townsend, K (2007) Improving employees' work-life balance in the construction industry: Project alliance case study. Journal of Construction Engineering and Management, 133(10), pp. 807-815. ISSN 0733-9364

Liu, J.; Chen, J.; Li, Y. and Zhao, K. (2026) Optimizing constrained construction crew-task assignment with grey wolf optimizer. Journal of Construction Engineering and Management, 152(8): 04026118, ISSN 0733-9364

Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364

Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364

Liu, J and Rahbar, F (2004) Project time-cost trade-off optimization by maximal flow theory. Journal of Construction Engineering and Management, 130(4), pp. 607-609. ISSN 0733-9364

Liu, J; Chen, J; Tian, J and Li, Y (2025) An efficient random key-based genetic algorithm for solving multimode resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 151(12): 04025193, ISSN 0733-9364

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, L-Y (1991) Coops: Construction object-oriented process simulation system. PhD thesis, University of Michigan, USA.

Liu, S S and Wang, C J (2009) Two-stage profit optimization model for linear scheduling problems considering cash flow. Construction Management and Economics, 27(11), pp. 1023-1037. ISSN 1466433X

Liu, S S and Wang, C J (2010) Profit optimization for multiproject scheduling problems considering cash flow. Journal of Construction Engineering and Management, 136(12), pp. 1268-1278. ISSN 0733-9364

Liu, W (2008) Systems theory based method for construction project planning. PhD thesis, University of Florida, USA.

Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364

Liu, W; Zhang, J; Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(6): 04024047, ISSN 0733-9364

Liu, Y and Mohamed, Y (2012) Modelling industrial construction operations using a multi-agent resource allocation framework. Engineering, Construction and Architectural Management, 19(4), pp. 406-427. ISSN 0969-9988

Liu, Z; Li, X; Gao, Z; Zhang, Y; Teng, Y and Wu, C (2025) A hybrid and intuitive work packaging approach with multiple task relations, general work package precedence, and BIM in modular construction. Journal of Construction Engineering and Management, 151(4): 04025019, ISSN 0733-9364

Lopez, R; Chong, H Y; Wang, X and Graham, J (2016) Technical review: Analysis and appraisal of four-dimensional building information modeling usability in construction and engineering projects. Journal of Construction Engineering and Management, 142(5): 06015005, ISSN 0733-9364

Lorterapong, P and Moselhi, O (1996) Project-network analysis using fuzzy sets theory. Journal of Construction Engineering and Management, 122(4), pp. 308-317. ISSN 0733-9364

Lorterapong, P and Ussavadilokrit, M (2013) Construction scheduling using the constraint satisfaction problem method. Journal of Construction Engineering and Management, 139(4), pp. 414-422. ISSN 0733-9364

Love, P E D (2002) Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 18-29. ISSN 0733-9364

Lu, H; Wang, H; Yu, D and Ye, J (2023) Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: A case study of huoshengshan and leishenshan hospital projects in wuhan. Engineering, Construction and Architectural Management, 30(8), pp. 3696-3712. ISSN 0969-9988

Lu, M (2003) Simplified discrete-event simulation approach for construction simulation. Journal of Construction Engineering and Management, 129(5), pp. 537-546. ISSN 0733-9364

Lu, M and AbouRizk, S M (2000) Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management, 126(3), pp. 219-226. ISSN 0733-9364

Lu, M and Lam, H C (2008) Critical path scheduling under resource calendar constraints. Journal of Construction Engineering and Management, 134(1), pp. 25-31. ISSN 0733-9364

Lu, M and Lam, H C (2009) Transform schemes applied on non-finish-to-start logical relationships in project network diagrams. Journal of Construction Engineering and Management, 135(9), pp. 863-873. ISSN 0733-9364

Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364

Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.

Lucko, G (2008) Productivity scheduling method compared to linear and repetitive project scheduling methods. Journal of Construction Engineering and Management, 134(9), pp. 711-720. ISSN 0733-9364

Lucko, G (2009) Productivity scheduling method: Linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(4), pp. 246-253. ISSN 0733-9364

Lucko, G (2011) Integrating efficient resource optimization and linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 137(1), pp. 45-55. ISSN 0733-9364

Lucko, G (2011) Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), pp. 523-535. ISSN 0733-9364

Lucko, G; Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(6), pp. 575-594. ISSN 01446193

Lucko, G and Gattei, G (2016) Line-of-balance against linear scheduling: Critical comparison. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 26-44. ISSN 17514304

Lucko, G and Pea Orozco, A A (2009) Float types in linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(5), pp. 368-377. ISSN 0733-9364

Lutz, J D and Hijazi, A (1993) Planning repetitive construction: Current practice. Construction Management and Economics, 11(2), pp. 99-110. ISSN 01446193

Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364

Ma, G; Wang, A; Li, N; Gu, L and Ai, Q (2014) Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12): 04014055, ISSN 0733-9364

Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.

Mahamid, I (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction, 22(2), pp. 192-210. ISSN 1366-4387

Mahdavian, A and Shojaei, A (2020) Hybrid genetic algorithm and constraint-based simulation framework for building construction project planning and control. Journal of Construction Engineering and Management, 146(12): 04020140, ISSN 0733-9364

Mahdi Hosseinian, S; Arjomand, A; Li, C Q and Zhang, G (2022) Developing a model for assessing project completion time reliability during construction using time-dependent reliability theory. Journal of Construction Engineering and Management, 148(4): 04022006, ISSN 0733-9364

Maheswari, J U; Mujumdar, P; Padala, S P S and Gwaskoti, A (2022) BDM–MDM integrated solution concept for scheduling information-driven projects. Engineering, Construction and Architectural Management, 29(2), pp. 1016-1037. ISSN 0969-9988

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.

Mahmood, A and Abrishami, S (2020) BIM for lean building surveying services. Construction Innovation, 20(3), pp. 447-470. ISSN 1471-4175

Mahmoodi, A. and Easa, S. M. (2026) A multi-objective matheuristic framework for sustainable truck-UAV last-mile delivery in smart urban built environments. Smart and Sustainable Built Environment, pp. 1-48. ISSN 2046-6099

Mahmoodzadeh, A; Nejati, H R; Flaih, L R; Ibrahim, H H; Alenizi, F A and Alassaf, Y (2024) A rigorous examination of twelve cutting-edge machine-learning techniques for predicting time and cost in tunneling projects. Journal of Construction Engineering and Management, 150(12): 04024176, ISSN 0733-9364

Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.

Malekaee Ashtiyani, F.; Karimi Gavareshki, M. h and Gheidar-Kheljani, J. (2026) Real-time prediction of project duration deviation using CNN-LSTM-FIS. Built Environment Project and Asset Management, 16(2), pp. 304-320. ISSN 2044-124X

Maradza, E N (2015) Adaptation of industry BIM process standards in a large construction firm. PhD thesis, University of Reading, UK.

Maravas, A and Pantouvakis, J P (2011) Fuzzy repetitive scheduling method for projects with repeating activities. Journal of Construction Engineering and Management, 137(7), pp. 561-564. ISSN 0733-9364

Marchant, T (2013) Keep going: Career perspectives on ageing and masculinity of self-employed tradesmen in Australia. Construction Management and Economics, 31(8), pp. 845-860. ISSN 1466433X

Mariaca Clavel, Israel Simon (2025) Dynamic construction scheduling: Utilizing AI data automation in a BIM-integrated serious game framework. PhD thesis, University College London, UK.

Marion, G L C; Saurin, T A and Viana, D D (2025) The cost-benefit of slack in production planning and control in construction projects. Construction Management and Economics, 43(11), pp. 883-900. ISSN 0144-6193

Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599

Marshall, J J (2008) City Inn v. Shepherd: A matter of judgement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 71-75. ISSN 17514312

Martins, S S; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Evaluation of 4D BIM tools applicability in construction planning efficiency. International Journal of Construction Management, 22(15), pp. 2987-3000. ISSN 1562-3599

Marzouk, M; Abdallah, M and El-Said, M (2010) Modeling microtunneling projects using computer simulation. Journal of Construction Engineering and Management, 136(6), pp. 670-682. ISSN 0733-9364

Masera, M (1999) An innovative planning technique in quality management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Mat Zin, R (2006) A case study of management control. A construction project: Issues of transaction costs and trust. PhD thesis, University of Manchester, UK.

Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.

Mattila, K G and Abraham, D M (1998) Linear scheduling: Past research efforts and future directions. Engineering, Construction and Architectural Management, 5(3), pp. 294-303. ISSN 0969-9988

Mattila, K G and Abraham, D M (1998) Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), pp. 232-243. ISSN 0733-9364

Mattila, K G and Bowman, M R (2004) Accuracy of highway contractor's schedules. Journal of Construction Engineering and Management, 130(5), pp. 647-655. ISSN 0733-9364

Mattila, K G and Park, A (2003) Comparison of linear scheduling model and repetitive scheduling method. Journal of Construction Engineering and Management, 129(1), pp. 56-64. ISSN 0733-9364

Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(4), pp. 629-638. ISSN 1562-3599

McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.

McCann, M (1986) An application of convex programming to construction scheduling. PhD thesis, Iowa State University, USA.

McGartland, M R and Hendrickson, C T (1985) Expert systems for construction project monitoring. Journal of Construction Engineering and Management, 111(3), pp. 293-307. ISSN 0733-9364

McLeod, J S (2000) Planning for startup: An evaluation of factors affecting the startup of process industry facilities. PhD thesis, University of Texas at Austin, USA.

Meese, N (2012) Knowledge sharing for sustainable development: a mixed-method study of an international civil engineering consultancy. EngD thesis, University of Bath, UK.

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Mehmood, U.; Ujang, U. and Azri, S. (2026) Spatiotemporal 3D GIS-integrated rule-based scheduling for high-rise maintenance optimisation: A Malaysian case study. Built Environment Project and Asset Management, 16(2), pp. 321-337. ISSN 2044-124X

Mejlænder-Larsen, Ø (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(4), pp. 648-667. ISSN 0969-9988

Memon, F A (2023) Stakeholder engagement in managing scope change during the execution phase of UK construction projects. PhD thesis, University of Bedfordshire, UK.

Mendes, J R; Fernando, L; Heineck, M and Vaca, O L (1998) New applications of line of balance on scheduling of multi-storey buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364

Messi, Leonardo (2022) Development of a BIM-based simulator for workspace management in construction. PhD thesis, Università Politecnica delle Marche, Italy.

Miers, R J (2001) Critical needs in current construction management education practices: The problem solving process as related to the curriculum. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.

Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451

Miller, S and Dorée, A (2008) Improving logistics in the asphalt paving process: What can we learn from the planner's logic? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Minchin Jr, R E; Henriquez, N R; King, A M and Lewis, D W (2010) Owners respond: Preferences for task performance, delivery systems, and quality management. Journal of Construction Engineering and Management, 136(3), pp. 283-293. ISSN 0733-9364

Miskawi, Z (1993) A numerical analysis method for computing schedule and resource forecasting for industrial projects. Construction Management and Economics, 11(6), pp. 411-420. ISSN 01446193

Mogge Jr., J W (2004) Breaking through the first cost barriers of sustainable planning, design, and construction. PhD thesis, Georgia Institute of Technology, USA.

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.

Mohamed, Emad (2021) Decision-support system for construction risk management in onshore wind projects. PhD thesis, University of Alberta, Canada.

Mohamed, S Y (2020) Stochastic performance and maintenance optimization models for pavement infrastructure management. PhD thesis, Purdue University, USA.

Mohamed, Y; Borrego, D; Francisco, L; Al-Hussein, M; Abourizk, S and Hermann, U (2007) Simulation-based scheduling of module assembly yards: Case study. Engineering, Construction and Architectural Management, 14(3), pp. 293-311. ISSN 0969-9988

Mohammadi, A; Amador-Jimenez, L and Nasiri, F (2020) Reliable, effective, and sustainable urban railways: A model for optimal planning and asset management. Journal of Construction Engineering and Management, 146(6): 04020057, ISSN 0733-9364

Mohammadi, A; Igwe, C; Amador-Jimenez, L and Nasiri, F (2020) Applying lean construction principles in road maintenance planning and scheduling. International Journal of Construction Management, 22(12), pp. 2364-2374. ISSN 1562-3599

Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364

Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.

Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.

Mokhtar, A H M (1998) An information model for managing design changes in a collaborative multidisciplinary design environment. PhD thesis, Concordia University, Canada.

Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364

Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology. DEng thesis, George Washington University, USA.

Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599

Moore, N (2013) A model based system for contextual on-site construction planning in augmented reality. PhD thesis, University of Wolverhampton, UK.

Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.

Morad, A A (1990) Geometric-based reasoning system for project planning utilizing AI and CAD technologies. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Morgado, J and Neves, J (2014) Work zone planning in pavement rehabilitation: Integrating cost, duration, and user effects. Journal of Construction Engineering and Management, 140(11): 4014050, ISSN 0733-9364

Morkos, R (2014) Operational efficiency frontier: Visualizing, manipulating, and navigating the construction scheduling state space with precedence, discrete, and disjunctive constraints. PhD thesis, Stanford University, USA.

Moselhi, O and Deb, B (1993) Project selection considering risk. Construction Management and Economics, 11(1), pp. 45-52. ISSN 01446193

Moselhi, O and Ei-Rayes, K (1993) Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, 119(4), pp. 681-697. ISSN 0733-9364

Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364

Moselhi, O and Lorterapong, P (1993) Near optimal solution for resource-constrained scheduling problems. Construction Management and Economics, 11(4), pp. 293-303. ISSN 01446193

Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364

Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175

Mostafa, K and Hegazy, T (2025) Smart rehabilitation-planning framework for sustainable infrastructure: Roofing application. Journal of Construction Engineering and Management, 151(2): 04024203, ISSN 0733-9364

Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.

Moussa, M; Ruwanpura, J and Jergeas, G (2007) CTAN for risk assessments using multilevel stochastic networks. Journal of Construction Engineering and Management, 133(1), pp. 96-101. ISSN 0733-9364

Moussourakis, J and Haksever, C (2004) Flexible model for time/cost tradeoff problem. Journal of Construction Engineering and Management, 130(3), pp. 307-314. ISSN 0733-9364

Moussourakis, J and Haksever, C (2007) Models for accurate computation of earliest and latest start times and optimal compression in project networks. Journal of Construction Engineering and Management, 133(8), pp. 600-608. ISSN 0733-9364

Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.

Musselwhite, D; Gledson, B and Greenwood, D (2021) Matters affecting construction project-level planning effectiveness: A literature review. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.

Naas, J D (1990) Identifying and predicting present and future occupational competencies for commercial construction superintendents in Illinois. PhD thesis, Southern Illinois University at Carbondale, USA.

Nadafi, S; Moosavirad, S H and Ariafar, S (2019) Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management, 26(9), pp. 2107-2119. ISSN 0969-9988

Nageeb, M (2012) The effectiveness of the hybrid graphical representation method in visually combining and communicating logical and spatial relationships between scheduled activities. PhD thesis, Texas A&M University, USA.

Nam, C H and Tatum, C B (1997) Leaders and champions for construction innovation. Construction Management and Economics, 15(3), pp. 259-270. ISSN 01446193

Nasir, D; McCabe, B and Hartono, L (2003) Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model. Journal of Construction Engineering and Management, 129(5), pp. 518-527. ISSN 0733-9364

Nasirian, A; Abbasi, B; Cheng, T C E and Arashpour, M (2022) Multiskilled workforce planning: A case from the construction industry. Journal of Construction Engineering and Management, 148(5): 04022021, ISSN 0733-9364

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.

Nassar, K M; Gunnarsson, H G and Hegab, M Y (2005) Using weibull analysis for evaluation of cost and schedule performance. Journal of Construction Engineering and Management, 131(12), pp. 1257-1262. ISSN 0733-9364

Nassar, K M and Hegab, M Y (2006) Developing a complexity measure for project schedules. Journal of Construction Engineering and Management, 132(6), pp. 554-561. ISSN 0733-9364

Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364

Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), pp. 1225-1229. ISSN 1466433X

Nawaz Khan, A; Khan, N A and Soomro, M A (2020) Influence of ethical leadership in managing human resources in construction companies. Journal of Construction Engineering and Management, 146(11): 04020125, ISSN 0733-9364

Ndekugri, I; Braimah, N and Gameson, R (2008) Delay analysis within construction contracting organizations. Journal of Construction Engineering and Management, 134(9), pp. 692-700. ISSN 0733-9364

Nee, T S; Xing, A C and Yong, L Y (2024) Assessing the post-disaster effects of COVID-19 pandemic towards Malaysian construction industry. Journal of Construction in Developing Countries, 29(2), pp. 59-75. ISSN 1823-6499

Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation. PhD thesis, University of Maryland, College Park, USA.

Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.

Nepal, M P; Park, M and Son, B (2006) Effects of schedule pressure on construction performance. Journal of Construction Engineering and Management, 132(2), pp. 182-188. ISSN 0733-9364

Nevett Fernández, G (2020) Duration estimators and productivity metrics for highway construction. PhD thesis, University of Colorado at Boulder, USA.

Ng, Y. Y.; Ma, Q. and Yam, M. C. H. (2026) Optimizing subcontractor selection: A dual-model AHP framework for aligning client and contractor priorities in construction. Journal of Engineering, Design and Technology, 24(4), pp. 869-893. ISSN 1726-0531

Nguyen, M. V. and Do, X. S. (2026) Investigating key sources of work stress at Vietnamese architectural design firms. Journal of Engineering, Design and Technology, 24(6), pp. 1412-1434. ISSN 1726-0531

Nguyen, D T; Doan, D T V; Tran, N N C and Tran, D H (2023) A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects. International Journal of Construction Management, 23(5), pp. 843-854. ISSN 1562-3599

Nguyen, Dinh Manh (2017) Maintenance practices: Improving sustainability performance of existing office buildings: An Australian case study. PhD thesis, University of Technology Sydney, Australia.

Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.

Nguyen, L D; Phan, D H and Tang, L C M (2013) Simulating construction duration for multistory buildings with controlling activities. Journal of Construction Engineering and Management, 139(8), pp. 951-959. ISSN 0733-9364

Nguyen, L d (2007) The dynamics of float, logic, resource allocation, and delay timing in forensic schedule analysis and construction delay claims. PhD thesis, University of California, Berkeley, USA.

Nguyen, T H D; Chileshe, N; Rameezdeen, R and Wood, A (2019) Stakeholder influence pathways in construction projects: Multicase study. Journal of Construction Engineering and Management, 145(9): 05019011, ISSN 0733-9364

Nikolić, D (2011) Evaluating a simulation game in construction engineering education: The virtual construction simulator 3. PhD thesis, Pennsylvania State University, USA.

Niskanen, T and Lauttalammi, J (1989) Accident prevention in materials handling at building construction sites. Construction Management and Economics, 7(3), pp. 263-279. ISSN 01446193

Nkado, R N (1992) Construction time information system for the building industry. Construction Management and Economics, 10(6), pp. 489-509. ISSN 01446193

Noganta, A (2019) Key challenges faced by main contractors in coordinating the works of their subcontractors: A case study of kusile power station project. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Noorian Talouki, R; Hosseini Shirvani, M and Motameni, H (2022) A hybrid meta-heuristic scheduler algorithm for optimization of workflow scheduling in cloud heterogeneous computing environment. Journal of Engineering, Design and Technology, 20(6), pp. 1581-1605. ISSN 1726-0531

Noyce, D A and Hanna, A S (1997) Planned schedule compression concept file for electrical contractors. Journal of Construction Engineering and Management, 123(2), pp. 189-197. ISSN 0733-9364

Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: The impact on labour. Construction Management and Economics, 16(1), pp. 79-90. ISSN 01446193

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Nwadigo, O B K; Naismith, N; GhaffarianHoseini, A; GhaffarianHoseini, A and Tookey, J (2022) Construction project planning and scheduling as a dynamic system: A content analysis of the current status, technologies and forward action. Smart and Sustainable Built Environment, 11(4), pp. 972-995. ISSN 2046-6099

O'Brien, P J (2007) Timely completion of school construction projects in Ohio as a function of compliance with contractual schedule development timelines. PhD thesis, Walden University, USA.

O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364

O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364

Olbina, S (2008) Improving the delivery system for teaching the project planning and feasibility/site development course to building construction undergraduate students and real estate graduate students. International Journal of Construction Education and Research, 4(1), pp. 46-64. ISSN 1557-8771

Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364

Olivieri, H; Seppänen, O; Alves, T D C L; Scala, N M; Schiavone, V; Liu, M and Granja, A D (2019) Survey comparing critical path method, last planner system, and location-based techniques. Journal of Construction Engineering and Management, 145(12): 04019077, ISSN 0733-9364

Olivieri, H; Seppänen, O and Denis Granja, A (2018) Improving workflow and resource usage in construction schedules through location-based management system (LBMS). Construction Management and Economics, 36(2), pp. 109-124. ISSN 01446193

Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.

Oloke, D; Manase, D and Olomolaiye, P (2005) Construction health and safety (H&S) performance: A conceptual framework for enhancing information and communication technology (ICT) impacts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Oloufa, A A; Eltahan, A A and Papacostas, C S (1994) Integrated GIS for construction site investigation. Journal of Construction Engineering and Management, 120(1), pp. 211-222. ISSN 0733-9364

Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.

Ombwayo, J; Kidombo, H and Gakuu, C (2026) Moderating influence of stakeholder involvement on the relationship between project management lifecycle and performance of slum upgrading projects: A case of Nairobi city county, Kenya. International Journal of Construction Management, 26(1), pp. 1-11. ISSN 1562-3599

Oo, B L; Lim, T H B and Zhang, Y (2021) Women workforce in construction during the COVID-19 pandemic: Challenges and strategies. Construction Economics and Building, 21(4), pp. 38-59. ISSN 2204-9029

Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Orczyk, J J (1989) Parametric construction scheduling. PhD thesis, Purdue University, USA.

Osman, H M and El-Diraby, T E (2011) Knowledge-enabled decision support system for routing urban utilities. Journal of Construction Engineering and Management, 137(3), pp. 198-213. ISSN 0733-9364

Oswald, D; Sherratt, F and Smith, S (2019) Managing production pressures through dangerous informality: A case study. Engineering, Construction and Architectural Management, 26(11), pp. 2581-2596. ISSN 0969-9988

Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.

Ouga, A D; Alinaitwe, H M and Mwesige, G (2020) Modelling block laying productivity on building sites in Kampala. Journal of Construction in Developing Countries, 25(1), pp. 109-128. ISSN 1823-6499

Ovararin, N (2001) Quantifying productivity loss due to field disruptions in masonry construction. PhD thesis, University of Texas at Austin, USA.

Oyewobi, L; Okanlawon, T T; Ibrahim, K and Jimoh, R A (2025) Influence of blockchain adoption barriers and drivers on potential application areas in the construction lifecycle: Partial least squares structural equation modelling (PLS-SEM) approach. Engineering, Construction and Architectural Management, 32(3), pp. 1798-1815. ISSN 0969-9988

O’Brien, J J; Kreitzberg, F C and Mikes, W F (1985) Network scheduling variations for repetitive work. Journal of Construction Engineering and Management, 111(2), pp. 105-116. ISSN 0733-9364

Pace, C B (1999) A factor-based three dimensional model of the process of new technology development in the construction engineering industry. PhD thesis, University of California, Berkeley, USA.

Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387

Paek, J H and Ock, J H (1996) Innovative building construction technique: Modified up/down method. Journal of Construction Engineering and Management, 122(2), pp. 141-146. ISSN 0733-9364

Pagdadis, S (1990) An advanced technologies assessment strategy for construction automation. PhD thesis, University of Texas at Austin, USA.

Pahwa, J S (2009) MDSSF: a federated architecture for product procurement. PhD thesis, Cardiff University, UK.

Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Panwar, A and Jha, K N (2019) A many-objective optimization model for construction scheduling. Construction Management and Economics, 37(12), pp. 727-739. ISSN 01446193

Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364

Panwar, A; Tripathi, K K and Jha, K N (2019) A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 1924-1945. ISSN 0969-9988

Pareek, P; Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(1), pp. 54-66. ISSN 1562-3599

Park, M (2001) Dynamic planning and control methodology for large-scale concurrent construction projects. PhD thesis, Massachusetts Institute of Technology, USA.

Park, M and Peña-Mora, F (2004) Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5), pp. 626-637. ISSN 0733-9364

Park, M-W (2012) Automated 3D vision-based tracking of construction entities. PhD thesis, Georgia Institute of Technology, USA.

Parsi, M; Baradaran, V and Hosseinian, A H (2025) Integrating the stochastic multiproject scheduling and material ordering problems for offshore projects: Multiagent optimization methodology. Engineering, Construction and Architectural Management, 32(4), pp. 2614-2645. ISSN 0969-9988

Pasiphol, S (1994) New concepts for total float distribution in CPM project scheduling. PhD thesis, University of Texas at Austin, USA.

Patsiatzis, Dimitrios I (2003) Optimal process plant layout using mathematical programming. PhD thesis, University College London, UK.

Paulson, B C; Beisman, G H; Bell, L C; Bjornsson, H C; Bowerman, M D; Carr, R I; Coppi, D F; Crandall, K C; DeLong, C E; Halpin, D W; Hogg, P; Levin, P; Lluch, J F; Logcher, R D; Melin, J W; Moore, W C; Mueller, F W; Nowak, J A; O'Connor, M J; Pinnell, S S; Sears, G A; Stark, R M; Stevens, J D; Tarkoy, P J and Youngs, J R (1985) Application of small computers in construction. Journal of Construction Engineering and Management, 111(3), pp. 173-189. ISSN 0733-9364

Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364

Paz, J C; Rozenboim, D; Cuadros, Á; Cano, S and Escobar, J W (2018) A simulation-based scheduling methodology for construction projects considering the potential impacts of delay risks. Construction Economics and Building, 18(2), pp. 41-69. ISSN 2204-9029

Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS accesstm and MS projecttm. Construction Management and Economics, 22(2), pp. 203-211. ISSN 01446193

Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of last planner system®: A case study. Engineering, Construction and Architectural Management, 25(9), pp. 1110-1126. ISSN 0969-9988

Perrenoud, A J and Sullivan, K T (2017) Analysis of executive succession planning in 12 construction companies. International Journal of Construction Education and Research, 13(1), pp. 64-80. ISSN 1557-8771

Perry, M J (1997) Distributed cognition and computer supported collaborative design: The organisation of work in construction engineering. PhD thesis, Brunel University, UK.

Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599

Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(2), pp. 67-81. ISSN 0961-3218

Phillips, H C (2009) A proposed method to determine confidence in a construction schedule. PhD thesis, University of New Mexico, USA.

Pieterse, B; Agyekum, K; Manu, P; Mohandes, S R; Cheung, C and Yunusa-Kaltungo, A (2024) Examining critical project management skills for successful delivery of major maintenance projects: Insights from the United Kingdom energy sector. Engineering, Construction and Architectural Management, 31(4), pp. 1556-1584. ISSN 0969-9988

Pinto Langoni, C R (1987) A decomposition approach for the project scheduling problem (network analysis). PhD thesis, Texas A&M University, USA.

Plotnick, F L (2008) Rdm: Relationship diagramming method. PhD thesis, Drexel University, USA.

Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364

Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.

Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364

Pour Aghajan, Marjan (2025) Supporting early decision-making between precast and in-situ concrete in construction industry. PhD thesis, Queensland University of Technology, Australia.

Pouyandeh, F; Golabchi, M and Taghizadeh, K (2022) Providing a model to choose the most appropriate agile method in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 14-27. ISSN 17514304

Pratas, J D G (2000) Comparison of the use and success of budgetary and schedule-based management information systems (MIS) in construction. PhD thesis, University of Manchester, UK.

Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.

Pregenzer, L J; Seppanen, P J; Kunz, J C and Paulson, B C (1999) Value-added assessment of construction plans. Journal of Construction Engineering and Management, 125(4), pp. 242-248. ISSN 0733-9364

Pryke, S D (2004) Analytical methods in construction procurement and management: A critical review. Journal of Construction Procurement, 10(1),

Pultar, M (1990) Progress-based construction scheduling. Journal of Construction Engineering and Management, 116(4), pp. 670-688. ISSN 0733-9364

Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099

Qi, Liang (2022) Towards understanding the diffusion and adoption of innovation in the Australian construction industry. PhD thesis, RMIT University, Australia.

Que, B C (2002) Incorporating practicability into genetic algorithm-based time-cost optimization. Journal of Construction Engineering and Management, 128(2), pp. 139-143. ISSN 0733-9364

Qui, N T (2013) Automated schedule generation and analysis from a construction requirement perspective. PhD thesis, National University of Singapore, Singapore.

Rachid, Z; Toufik, B and Mohammed, B (2019) Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), pp. 371-381. ISSN 1562-3599

Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364

Rahbar, F (1997) Computer-aided parametric planning (CAPP). PhD thesis, Iowa State University, USA.

Rai, Sanish (2016) Building occupancy simulation and data assimilation using a graph based agent oriented model. PhD thesis, Georgia State University, USA.

Raisbeck, P (2013) Time keeps on slippin', slippin', slippin' into the future: BIM, imaging and time on construction sights. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Rajput, B; Kore, S and Agarwal, A (2024) Competencies of civil engineering graduates: Indian construction professionals' perspective. International Journal of Construction Management, 24(11), pp. 1240-1248. ISSN 1562-3599

Ramani, P V; Selvaraj, P; T., S and Gupta, A (2022) Application of linear scheduling in water canal construction with a comparison of critical path method. Journal of Construction in Developing Countries, 27(1), pp. 189-212. ISSN 1823-6499

Rasdorf, W J and Herbert, M J (1990) Bar coding in construction engineering. Journal of Construction Engineering and Management, 116(2), pp. 261-280. ISSN 0733-9364

Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364

Reda, R M (1990) RPM: Repetitive project modeling. Journal of Construction Engineering and Management, 116(2), pp. 316-330. ISSN 0733-9364

Redden, L and Bugg, R A (2022) Efficacy and benefits of a required service-learning course in construction management education. International Journal of Construction Education and Research, 18(4), pp. 315-332. ISSN 1557-8771

Reis, J S and Lucko, G (2016) Productivity scheduling method with maximum constraints. International Journal of Construction Management, 16(1), pp. 77-93. ISSN 1562-3599

Ren, Z (2002) A multi-agent systems approach to construction claims negotiation. PhD thesis, Loughborough University, UK.

Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099

Reynolds, M F (1990) Facilities planning and construction internship. DEng thesis, Texas A&M University, USA.

Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.

Rezakhani, P (2022) Project scheduling and performance prediction: A fuzzy-Bayesian network approach. Engineering, Construction and Architectural Management, 29(6), pp. 2233-2244. ISSN 0969-9988

Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), pp. 2864-2876. ISSN 1562-3599

Richards, J L (1973) An integrated approach to construction management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364

Robles, J (2023) Fast-track projects with cost and schedule overruns: A supply chain management perspective. DBA thesis, Capella University, USA.

Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.

Rocha, C G D; Anzanello, M J and Gerchman, M (2018) Method to assess the match between clients' input and decoupling points in customized building projects. Journal of Construction Engineering and Management, 144(5): 04018018, ISSN 0733-9364

Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988

Roofigari-Esfahan, N; Paez, A and N.razavi, S (2015) Location-aware scheduling and control of linear projects: Introducing space-time float prisms. Journal of Construction Engineering and Management, 141(1): 06014008, ISSN 0733-9364

Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-aware linear schedule optimization: A space-time constraint-satisfaction approach. Journal of Construction Engineering and Management, 143(5): 04016132, ISSN 0733-9364

Rotimi, J O B and Ramanayaka, C D D (2015) Analysis of the influence of a strategy-led planning approach on successful construction project implementation. Construction Economics and Building, 15(2), pp. 13-30. ISSN 2204-9029

Royer, K (1986) The federal government and the critical path. Journal of Construction Engineering and Management, 112(2), pp. 220-225. ISSN 0733-9364

Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193

Russell, A D and Caselton, W F (1988) Extensions to linear scheduling optimization. Journal of Construction Engineering and Management, 114(1), pp. 36-52. ISSN 0733-9364

Russell, A D and Wong, W C M (1993) New generation of planning structures. Journal of Construction Engineering and Management, 119(2), pp. 196-214. ISSN 0733-9364

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Russell, M M; Howell, G; Hsiang, S M and Liu, M (2013) Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10): 04013008, ISSN 0733-9364

Russell, M M; Hsiang, S M; Liu, M and Wambeke, B (2014) Causes of time buffer and duration variation in construction project tasks: Comparison of perception to reality. Journal of Construction Engineering and Management, 140(6): 4014016, ISSN 0733-9364

Russell, M M; Liu, M; Howell, G and Hsiang, S M (2015) Case studies of the allocation and reduction of time buffer through use of the last planner system. Journal of Construction Engineering and Management, 141(2): 04014068, ISSN 0733-9364

Russell, M M; Liu, M and Hsiang, S M (2015) Planning for uncertainty: Use of structural equation modelling to determine the causal structure of time buffer allocation. Construction Management and Economics, 33(10), pp. 783-798. ISSN 01446193

Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175

Rusydiana, A. S.; Uula, M. M. and Riani, R. (2026) Measuring the performance of climate action of OIC countries. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 277-296. ISSN 1759-5908

Sacks, R; Esquenazi, A and Goldin, M (2007) LEAPCON: Simulation of lean construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(7), pp. 529-539. ISSN 0733-9364

Sacks, R and Goldin, M (2007) Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(5), pp. 374-384. ISSN 0733-9364

Sadeghi, S.; Niu, C.; Marjani, T. and Lotfi, R. (2026) Machine learning-enabled construction project management: Systematic review, comparative performance synthesis and implementation framework. Built Environment Project and Asset Management, 16(3), pp. 461-483. ISSN 2044-124X

Sadeghi, N; Fayek, A R and Seresht, N G (2016) A fuzzy discrete event simulation framework for construction applications: Improving the simulation time advancement. Journal of Construction Engineering and Management, 142(12): 04016071, ISSN 0733-9364

Sadeghi, Neda (2024) Quantifying the impact of time-space conflict on construction project schedules: A task-centric approach. PhD thesis, Texas A&M University, USA.

Said, H M and Kandimalla, P (2018) Performance measurement of building sheet-metal ductwork prefabrication under batch production settings. Journal of Construction Engineering and Management, 144(2): 4017107, ISSN 0733-9364

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364

Sakka, Z I and El-Sayegh, S M (2007) Float consumption impact on cost and schedule in the construction industry. Journal of Construction Engineering and Management, 133(2), pp. 124-130. ISSN 0733-9364

Salam, Md Abdus (2007) Time and cost overruns on high-rise building construction in Bangladesh. PhD thesis, Abertay University, UK.

Salama, T and Moselhi, O (2019) Multi-objective optimization for repetitive scheduling under uncertainty. Engineering, Construction and Architectural Management, 26(7), pp. 1294-1320. ISSN 0969-9988

Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175

Salas-Morera, L; Arauzo-Azofra, A; García-Hernández, L; Palomo-Romero, J M and Ayuso-Muñoz, J L (2018) New approach to the distribution of project completion time in PERT networks. Journal of Construction Engineering and Management, 144(10): 04018094, ISSN 0733-9364

Salem, O and Mohanty, S (2008) Project management practices and information technology research. Journal of Construction Engineering and Management, 134(7), pp. 501-508. ISSN 0733-9364

Salhab, D; Lindhard, S M and Hamzeh, F (2024) Simulation-based approximation of the gain from applying overlapping activities. Journal of Construction Engineering and Management, 150(4): 04024019, ISSN 0733-9364

Salhab, D; Lindhard, S M and Hamzeh, F (2024) Schedule compression and emerging waste in construction: An assessment of overlapping activities. Engineering, Construction and Architectural Management, 31(12), pp. 4920-4941. ISSN 0969-9988

Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364

Salman, A; Moselhi, O and Zayed, T (2013) Scheduling model for rehabilitation of distribution networks using MINLP. Journal of Construction Engineering and Management, 139(5), pp. 498-509. ISSN 0733-9364

Salter, M (1989) Planning systems for small firms. PhD thesis, Sheffield Hallam University, UK.

Sam, M; Franz, B W and Alwisy, A (2026) Comparing vulnerability to adverse events in construction processes performed by human-robot collaboration and traditional crews: A case study in drywall finishing. Journal of Construction Engineering and Management, 152(6): 05026005, ISSN 0733-9364

Samuels, A F and Bruder, M J (1996) Construction representative: Scheduling and cost management. Journal of Construction Engineering and Management, 122(3), pp. 281-290. ISSN 0733-9364

Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364

Sandberg, R; Löwstedt, M and Räisänen, C (2021) Working in a loosely coupled system: Exploring practices and implications of coupling work on construction sites. Construction Management and Economics, 39(3), pp. 212-226. ISSN 01446193

Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599

Sarhan, S; Pretlove, S; Elghaish, F; Matarneh, S and Mossman, A (2025) Sources of occupational stress in UK construction projects: An empirical investigation and agenda for future research. Smart and Sustainable Built Environment, 14(6), pp. 1701-1728. ISSN 2046-6099

Sarihi, M; Shahhosseini, V and Banki, M T (2020) Multiskilled project management workforce assignment across multiple projects regarding competency. Journal of Construction Engineering and Management, 146(12): 04020134, ISSN 0733-9364

Sarkar, D; Gohel, J and Dabasia, K (2021) Optimization of ready mixed concrete delivery for commercial batching plants of Ahmedabad, India. International Journal of Construction Management, 21(10), pp. 1024-1043. ISSN 1562-3599

Sarkar, D; Jha, K N and Patel, S (2021) Critical chain project management for a highway construction project with a focus on theory of constraints. International Journal of Construction Management, 21(2), pp. 194-207. ISSN 1562-3599

Sarraj, Z M A (1990) Formal development of line-of-balance technique. Journal of Construction Engineering and Management, 116(4), pp. 689-704. ISSN 0733-9364

Sassano, G (2022) Optimism bias and cost overruns: experimenting on the internal and external views in resources and time estimation. PhD thesis, University College London, UK.

Sawhney, A (1994) Simulation-based planning for construction. PhD thesis, University of Alberta, Canada.

Sawhney, A and AbouRizk, S M (1995) HSM-simulation-based planning method for construction projects. Journal of Construction Engineering and Management, 121(3), pp. 297-303. ISSN 0733-9364

Sawhney, A; Walsh, K D; Bashford, H H and Palaniappan, S (2009) Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management, 135(4), pp. 319-329. ISSN 0733-9364

Scala, N M; Alves, T d C L; Hawkins, D; Schiavone, V and Liu, M (2025) Application of the maturity model for collaborative scheduling for construction projects. Engineering, Construction and Architectural Management, 32(11), pp. 7399-7425. ISSN 0969-9988

Scala, N M; Liu, M; Alves, T C L; Schiavone, V and Hawkins, D (2023) The gold standard: Developing a maturity model to assess collaborative scheduling. Engineering, Construction and Architectural Management, 30(4), pp. 1636-1656. ISSN 0969-9988

Scales, Jeffrey G (2021) Including generative mechanisms in project scheduling using hybrid simulation. PhD thesis, University of Technology Sydney, Australia.

Schatteman, D; Herroelen, W; Van De Vonder, S and Boone, A (2008) Methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134(11), pp. 885-893. ISSN 0733-9364

Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.

Schneider, R H (1981) Local construction regulatory process innovation: A comparative analysis of Florida building inspection departments. PhD thesis, University of Florida, USA.

Scholtenhuis, L L O; Hartmann, T and Dorée, A G (2016) Testing the value of 4D visualizations for enhancing mindfulness in utility reconstruction works. Journal of Construction Engineering and Management, 142(7): 4016015, ISSN 0733-9364

Schroeder, H P (1991) Dycam 1.0: Dynamic construction activity model, a decision support tool for construction planning. PhD thesis, University of Colorado at Boulder, USA.

Schultmann, F and Rentz, O (2002) Scheduling of deconstruction projects under resource constraints. Construction Management and Economics, 20(5), pp. 391-401. ISSN 01446193

Schultmann, F and Sunke, N (2007) Energy-oriented deconstruction and recovery planning. Building Research & Information, 35(6), pp. 602-615. ISSN 0961-3218

Scott, S (1993) The nature and effects of construction delays. Construction Management and Economics, 11(5), pp. 358-369. ISSN 01446193

Scott, S (1997) Delay claims in UK contracts. Journal of Construction Engineering and Management, 123(3), pp. 238-244. ISSN 0733-9364

Selvam, G and Tadepalli, T C M (2022) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management, 22(4), pp. 659-668. ISSN 1562-3599

Senior, B A (1995) Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 397-403. ISSN 0733-9364

Senior, B A (1996) Electrical construction foreman task scheduling. Journal of Construction Engineering and Management, 122(4), pp. 363-369. ISSN 0733-9364

Senior, B A and Halpin, D W (1998) Simplified simulation system for construction projects. Journal of Construction Engineering and Management, 124(1), pp. 72-81. ISSN 0733-9364

Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.

Senouci, A and El-Rayes, K (2009) Time-profit trade-off analysis for construction projects. Journal of Construction Engineering and Management, 135(8), pp. 718-725. ISSN 0733-9364

Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364

Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364

Seppänen, O; Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(6), pp. 608-624. ISSN 01446193

Seppänen, O (2025) Integrated forecasting approach for takt and location-based scheduling. Journal of Construction Engineering and Management, 151(12): 04025199, ISSN 0733-9364

Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.

Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.

Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization. PhD thesis, University of Maryland, College Park, USA.

Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.

Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X

Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction. PhD thesis, Purdue University, USA.

Shahedi, F. and Abrishami, S. (2026) Adaptive construction scheduling with AI in 4D/5D BIM: Integrating weather data and activity-based costing. Smart and Sustainable Built Environment, pp. 1-15. ISSN 2046-6099

Shahsavand, P; Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(4), pp. 497-533. ISSN 0969-9988

Shaked, O and Warszawski, A (1992) Consched: Expert system for scheduling of modular construction projects. Journal of Construction Engineering and Management, 118(3), pp. 488-506. ISSN 0733-9364

Shamp, P (2017) Scheduling strategies for construction project managers toward on time delivery. PhD thesis, Walden University, USA.

Shan, Y (2014) Integrated information modeling of construction project productivity. PhD thesis, University of Colorado at Boulder, USA.

Shanmuganayagam, V (1989) Current float techniques for resources scheduling. Journal of Construction Engineering and Management, 115(3), pp. 401-411. ISSN 0733-9364

Sharma, H; McIntyre, C; Gao, Z and Nguyen, T H (2009) Developing a traffic closure integrated linear schedule for highway rehabilitation projects. Journal of Construction Engineering and Management, 135(3), pp. 146-155. ISSN 0733-9364

Sharma, S; Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(4), pp. 299-314. ISSN 1562-3599

Sharma, V; Zaki, M; Jha, K N and Krishnan, N M A (2022) Machine learning-aided cost prediction and optimization in construction operations. Engineering, Construction and Architectural Management, 29(3), pp. 1241-1257. ISSN 0969-9988

Shash, A A and Ahcom, J (2006) Organizational aspects of planning and scheduling subsystem. Journal of Construction Research, 7(1), pp. 247-265. ISSN 1609-9451

Sheikhkhoshkar, M; Bril El-Haouzi, H; Aubry, A and Hamzeh, F (2023) Functionality as a key concept for integrated project planning and scheduling methods. Journal of Construction Engineering and Management, 149(7): 04023053, ISSN 0733-9364

Shelake, A G and Gogate, N G (2026) An integrated risk prioritization and determination of activity-wise delay (irpad) framework for enhancing schedule management in tunnel projects. Engineering, Construction and Architectural Management, 33(1), pp. 763-784. ISSN 0969-9988

Shen, Z and Wu, J (2025) Multiobjective ant colony system algorithm for component-level construction schedule optimization. Journal of Construction Engineering and Management, 151(3): 04025002, ISSN 0733-9364

Shepherd, S and Woskie, S R (2010) Case study to identify barriers and incentives to implementing an engineering control for concrete grinding dust. Journal of Construction Engineering and Management, 136(11), pp. 1238-1248. ISSN 0733-9364

Shi, J J (1999) Activity-based construction (ABC) modeling and simulation method. Journal of Construction Engineering and Management, 125(5), pp. 354-360. ISSN 0733-9364

Shi, J J; Cheung, S O and Arditi, A (2001) Construction delay computation method. Journal of Construction Engineering and Management, 127(1), pp. 60-65. ISSN 0733-9364

Shi, Q; Yu, J; Zhang, L; Su, Y; Wang, J and Kong, Q (2025) An optimization model for the duration of workshop production processes for precast concrete components for highway projects. International Journal of Construction Management, 25(7), pp. 813-825. ISSN 1562-3599

Shih, N J and Huang, S T (2006) 3D scan information management system for construction management. Journal of Construction Engineering and Management, 132(2), pp. 134-142. ISSN 0733-9364

Shikhrobat, M B; Kabiri, S and Flanagan, R (2019) Project planning and scheduling using system dynamics for dealing with complexity on construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Shim, E and Kim, B C (2014) Batch-size based repetitive scheduling method (BRSM). International Journal of Construction Education and Research, 10(2), pp. 140-156. ISSN 1557-8771

Shirong, L (1996) New approach for optimization of overall construction schedule. Journal of Construction Engineering and Management, 122(1), pp. 7-13. ISSN 0733-9364

Shohet, I M and Frydman, S (2003) Communication patterns in construction at construction manager level. Journal of Construction Engineering and Management, 129(5), pp. 570-577. ISSN 0733-9364

Shokri, S; Haas, C T; Haas, R C G and Lee, S H (2016) Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142(2): 04015069, ISSN 0733-9364

Shrestha, K P (2016) Data analytics and visualization for enhanced highway construction cost indexes and as-built schedules. PhD thesis, Iowa State University, USA.

Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364

Shtub, A (1988) The integration of CPM and material management in project management. Construction Management and Economics, 6(4), pp. 261-272. ISSN 01446193

Shu-Shun, L and Shih, K C (2009) A framework of critical resource chain for project schedule analysis. Construction Management and Economics, 27(9), pp. 857-869. ISSN 1466433X

Siddika, A and Lu, M (2023) Project schedule acceleration optimization integrated with energy source-based assessment of occupational health and safety risks. Journal of Construction Engineering and Management, 149(12): 04023120, ISSN 0733-9364

Siddiqui, M K (2008) Coordination of distributed schedules in a heterogeneous environment: identification of conflicts using schedule mappings. PhD thesis, University of Texas at Austin, USA.

Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Singh, J; Cheng, J C P and Anumba, C J (2021) BIM-based approach for automatic pipe systems installation coordination and schedule optimization. Journal of Construction Engineering and Management, 147(11): 04021143, ISSN 0733-9364

Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029

Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364

Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.

Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.

Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364

Siu, M F F; Lu, M and Abourizk, S (2016) Resource supply-demand matching scheduling approach for construction workface planning. Journal of Construction Engineering and Management, 142(1): 04015048, ISSN 0733-9364

Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193

Smailes, R L (2000) Building chan chan: The application of construction project management to the analysis of ancient architecture. PhD thesis, University of Florida, USA.

Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks). PhD thesis, Purdue University, USA.

Smith, G R and Hancher, D E (1989) Estimating precipitation impacts for scheduling. Journal of Construction Engineering and Management, 115(4), pp. 552-566. ISSN 0733-9364

Soh, I (2003) The acquisition and analysis of time management perception in the architectural domain. PhD thesis, Texas A&M University, USA.

Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.

Soliman, E M (2005) Delay hierarchy propagation model. PhD thesis, University of Plymouth, UK.

Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model. PhD thesis, Purdue University, USA.

Son, J and Mattila, K G (2004) Binary resource leveling model: Activity splitting allowed. Journal of Construction Engineering and Management, 130(6), pp. 887-894. ISSN 0733-9364

Son, J and Skibniewski, M J (1999) Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1), pp. 23-31. ISSN 0733-9364

Song, L and Abourizk, S M (2008) Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134(10), pp. 786-794. ISSN 0733-9364

Song, Y and Chua, D K H (2007) Temporal logic representation schema for intermediate function. Journal of Construction Engineering and Management, 133(4), pp. 277-286. ISSN 0733-9364

Song, Y and Chua, D K H (2011) Requirement and availability time-window analysis of intermediate function. Journal of Construction Engineering and Management, 137(11), pp. 967-975. ISSN 0733-9364

Songer, A D; Diekmann, J E and Karet, D (2001) Animation-based construction schedule review. Construction Innovation, 1(3), pp. 181-190. ISSN 1471-4175

Songer, A D; Diekmann, J E; Rasheed, K A and Hays, B (2001) Construction scheduling using 3-D CAD and walk-thru. Construction Innovation, 1(3), pp. 191-207. ISSN 1471-4175

Sonmez, R; Aminbakhsh, S and Atan, T (2020) Activity uncrashing heuristic with noncritical activity rescheduling method for the discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 146(8): 1870, ISSN 0733-9364

Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364

Soo, Alexander (2015) The effect of construction demand on inexperienced bidders' bidding behaviour. PhD thesis, University of Sydney, Australia.

Sousa, V; Almeida, N M and Dias, L A (2014) Role of statistics and engineering judgment in developing optimized time-cost relationship models. Journal of Construction Engineering and Management, 140(8): 04014034, ISSN 0733-9364

Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.

Srijaroen, C; Hoy, M; Horpibulsuk, S; Rachan, R and Arulrajah, A (2021) Soil-cement screw pile: Alternative pile for low- and medium-rise buildings in soft bangkok clay. Journal of Construction Engineering and Management, 147(2): 1988, ISSN 0733-9364

Srisethanil, C (1996) Pedagogical framework for an engineering intelligent tutoring system. PhD thesis, Georgia Institute of Technology, USA.

Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations. PhD thesis, University of Michigan, USA.

Stevens, J D (1981) A study of the relationship between perturbations in construction time schedules and potential construction claims. PhD thesis, University of Washington, USA.

Sturts Dossick, C and Schunk, T K (2007) Subcontractor schedule control method. Journal of Construction Engineering and Management, 133(3), pp. 262-265. ISSN 0733-9364

Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.

Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.

Su, Y; Isaac, S and Lucko, G (2018) Integrated temporal-spatial model for construction plans with boolean logic operators. Journal of Construction Engineering and Management, 144(4): 04018009, ISSN 0733-9364

Su, Y and Lucko, G (2015) Optimum present value scheduling based on synthetic cash flow model with singularity functions. Journal of Construction Engineering and Management, 141(11): 04015036, ISSN 0733-9364

Su, Y; Lucko, G and Thompson, R C (2018) Application of voting theory to the float ownership problem. Journal of Construction Engineering and Management, 144(1): 04017094, ISSN 0733-9364

Suckarieh, G (1984) Construction management control with microcomputers. Journal of Construction Engineering and Management, 110(1), pp. 72-78. ISSN 0733-9364

Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.

Suhail, S A (1995) CPM/LOB: new methodology to integrate CPM and line of balance. PhD thesis, Loughborough University, UK.

Suhail, S A and Neale, R H (1994) CPM/LOB: New methodology to integrate CPM and line of balance. Journal of Construction Engineering and Management, 120(3), pp. 667-684. ISSN 0733-9364

Sun, C and Xu, J (2011) Estimation of time for wenchuan earthquake reconstruction in China. Journal of Construction Engineering and Management, 137(3), pp. 179-187. ISSN 0733-9364

Sunindijo, R Y and Zou, P X W (2011) Influence of technical skill on safety task implementation and safety climate development in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.

Tafese, E. M. and Mengistu, D. G. (2026) Labor productivity management practice in construction companies. International Journal of Construction Management, 26(8), pp. 1527-1542. ISSN 1562-3599

Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation. PhD thesis, University of Alberta, Canada.

Taghaddos, H; Abourizk, S; Mohamed, Y and Hermann, U (2012) Simulation-based auction protocol for resource scheduling problems. Journal of Construction Engineering and Management, 138(1), pp. 31-42. ISSN 0733-9364

Taghaddos, M; Pereira, E; Osorio-Sandoval, C; Hermann, U and Abourizk, S (2023) A data-driven approach for deploying safety policies for schedule planning in industrial construction projects: A case study. Journal of Construction Engineering and Management, 149(12): 05023013, ISSN 0733-9364

Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.

Tai, H W; Chen, J H; Cheng, J Y; Wei, H H; Hsu, S C and Liu, H C (2021) Determining worker training time for precast component production in construction: Empirical study in Taiwan. Journal of Construction Engineering and Management, 147(1): 0001964, ISSN 0733-9364

Talbot, B (2021) A novel data-driven tool to improve construction schedule accuracy. DProf thesis, Anglia Ruskin University, UK.

Talley, K G and Torres, A S (2018) Measuring the impact of using daily objectives to provide rapid feedback in construction courses. International Journal of Construction Education and Research, 14(2), pp. 95-117. ISSN 1557-8771

Tallgren, M V (2018) Developing a collaborative planning tool for construction-a building information model-enhanced planning and scheduling tool for production. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Tan, L; Zhang, Y; Chen, Y and Zhu, T (2023) A multiple-objective decision-support model for lighting maintenance routing considering carbon dioxide emissions and balanced workload. Journal of Construction Engineering and Management, 149(8): 04023063, ISSN 0733-9364

Tang, G; Zhao, Z; Cao, L; Qi, Y; Yu, X and Liu, W (2023) A simulation optimization approach to optimize dredger fleet schedule plan for dredging works in existing ports. Journal of Construction Engineering and Management, 149(2): 4022165, ISSN 0733-9364

Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.

Tang, S L; Ying, K C; Anson, M and Lu, M (2005) Rmcsim: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(1), pp. 15-31. ISSN 01446193

Tang, Y; Liu, R and Sun, Q (2014) Two-stage scheduling model for resource leveling of linear projects. Journal of Construction Engineering and Management, 140(7): 04014022, ISSN 0733-9364

Tao, S; Yu, J; Zhu, J; Chen, S and Li, X (2026) Precast component production scheduling considering outsourcing and multiskilled resources. Journal of Construction Engineering and Management, 152(5): 04026040, ISSN 0733-9364

Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364

Tao, Y; Hu, H; Xu, F and Zhang, Z (2025) Ergonomic risk mitigation through workforce planning for construction projects. Journal of Construction Engineering and Management, 151(4): 04025012, ISSN 0733-9364

Tapia, Ricardo M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. PhD thesis, Iowa State University, USA.

Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema. DTech thesis, KTH Royal Institute of Technology, Sweden.

Tatari, A (2023) Simulating cost risks for prefabricated construction in developing countries using Bayesian networks. Journal of Construction Engineering and Management, 149(6): 04023037, ISSN 0733-9364

Tatum, M C and Terrell, F (2012) Hurricane reconstruction in the United States Gulf Coast. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 199-219. ISSN 1759-5916

Tavakolan, M (2011) Development of construction projects scheduling with evolutionary algorithms. PhD thesis, Columbia University, USA.

Tavakolan, M; Chokan, F and Dadashi Haji, M (2024) Simultaneous project portfolio selection and scheduling from contractor perspective. International Journal of Construction Management, 24(3), pp. 298-313. ISSN 1562-3599

Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599

Taylor, J M (1981) Development and evaluation of a network scheduling procedure based on utility theory. PhD thesis, Texas A&M University, USA.

Tenah, K A (1979) Construction management information control systems (CMICS). PhD thesis, Texas A&M University, USA.

Tennant, S; McCarney, M and Tong, M K L (2012) Re-engineering the construction supply chain: Transferring on-site activity off-site. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364

Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Thabet, W Y and Beliveau, Y J (1994) HVLS: Horizontal and vertical logic scheduling for multistory projects. Journal of Construction Engineering and Management, 120(4), pp. 875-892. ISSN 0733-9364

Thabet, W Y and Beliveau, Y J (1994) Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management, 120(1), pp. 96-116. ISSN 0733-9364

Tharachai, T (2004) Multiple project resource scheduling for construction. PhD thesis, University of Michigan, USA.

Thiengburanathum, P (2003) Design of construction production systems: Representation, taxonomy, and design framework. PhD thesis, University of Colorado at Boulder, USA.

Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364

Thomas, H R; Horman, M J and De Souza, U E L (2004) Symbiotic crew relationships and labor flow. Journal of Construction Engineering and Management, 130(6), pp. 908-917. ISSN 0733-9364

Thomas, S R; Lee, S H; Spencer, J D; Tucker, R L and Chapman, R E (2004) Impacts of design/information technology on project outcomes. Journal of Construction Engineering and Management, 130(4), pp. 586-597. ISSN 0733-9364

Thompson Jr., R C (2012) Risk measurement, allocation, and pricing in network schedule systems. PhD thesis, Catholic University of America, USA.

Thorpe, D and Karan, E (2008) Method for calculating schedule delay considering weather conditions. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Tokdemir, O B (2003) ALISS: Advanced linear scheduling system. PhD thesis, Illinois Institute of Technology, USA.

Tokdemir, O B; Arditi, D and Balcik, C (2006) ALISS: Advanced linear scheduling system. Construction Management and Economics, 24(12), pp. 1253-1267. ISSN 1466433X

Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364

Tomar, A and Bansal, V K (2022) Generation, visualization, and evaluation schedule of repetitive construction projects using GIS. International Journal of Construction Management, 22(6), pp. 1104-1119. ISSN 1562-3599

Tomczak, M and Jaśkowski, P (2020) New approach to improve general contractor crew's work continuity in repetitive construction projects. Journal of Construction Engineering and Management, 146(5): 1824, ISSN 0733-9364

Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364

Tommelein, I D (2022) Work density method for takt planning of construction processes with nonrepetitive work. Journal of Construction Engineering and Management, 148(12): 04022134, ISSN 0733-9364

Tommelein, I D; Carr, R I and Odeh, A M (1994) Assembly of simulation networks using designs, plans, and methods. Journal of Construction Engineering and Management, 120(4), pp. 796-815. ISSN 0733-9364

Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364

Tonetto, M S; Formoso, C T; Saurin, T A; Bonesi De Luca, F; Lora, F P and Lantelme, E (2024) Resilient performance on construction projects in the post-pandemic era: An organizational perspective. Engineering, Construction and Architectural Management, 31(12), pp. 5007-5028. ISSN 0969-9988

Toor, S U R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), pp. 395-408. ISSN 1466433X

Tork, A (2013) A real-time crane service scheduling decision support system (CSS-DSS) for construction tower cranes. PhD thesis, University of Central Florida, USA.

Torres, A (2023) Using large peer-teaching groups to learn construction management software packages. International Journal of Construction Education and Research, 19(4), pp. 426-442. ISSN 1557-8771

Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364

Toǧan, V; Sulub, A S; Eirgash, M A and Mostofi, F (2026) Project scheduling to minimize the time and cost in large-scale construction projects with repulsion-based improved arithmetic optimization. Journal of Construction Engineering and Management, 152(3): 04025277, ISSN 0733-9364

Tran, D H (2020) Optimizing time-cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(9), pp. 2287-2313. ISSN 0969-9988

Tran, D H and Long, L D (2018) Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Engineering, Construction and Architectural Management, 25(5), pp. 623-638. ISSN 0969-9988

Triana-Granados, K V; Bernard, I R; Merlin, A; Lucko, G and Ballesteros-Pérez, P (2024) Graphical delay tracking for linear and repetitive schedules. Journal of Construction Engineering and Management, 150(8): 04024090, ISSN 0733-9364

Tsai, D M and Chiu, H N (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14(4), pp. 325-340. ISSN 01446193

Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects. PhD thesis, University of California, Berkeley, USA.

Turkoglu, H; Arditi, D and Polat, G (2023) Mathematical multiobjective optimization model for trade-offs in small-scale construction projects. Journal of Construction Engineering and Management, 149(7): 04023056, ISSN 0733-9364

Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364

Turkoglu, H; Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(4), pp. 619-628. ISSN 1562-3599

Turkoglu, H; Arditi, D and Polat, G (2025) Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects. Construction Management and Economics, 43(9), pp. 704-722. ISSN 0144-6193

Türkakın, O H; Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), pp. 2893-2909. ISSN 0969-9988

Ugwuoke, A A (2018) Innovation persistence during economic crisis by Nigeria's construction contracting firms: an investigation of the critical success factors. PhD thesis, University of Salford, UK.

Ungureanu, L C; Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules' quality. Engineering, Construction and Architectural Management, 26(2), pp. 224-244. ISSN 0969-9988

Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.

Valikoniene, L (2015) Resource buffers in critical chain project management. PhD thesis, University of Manchester, UK.

VanVactor, J D (2011) Cognizant healthcare logistics management: Ensuring resilience during crisis. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 245-255. ISSN 1759-5916

Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.

Vanhoucke, M (2006) Work continuity constraints in project scheduling. Journal of Construction Engineering and Management, 132(1), pp. 14-25. ISSN 0733-9364

Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.

Vatterott, A G (2018) A multi-skilled approach to property maintenance considering temporal, spatial and resource constraints. PhD thesis, University of Missouri - Saint Louis, USA.

Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988

Viles, E; Rudeli, N C and Santilli, A (2020) Causes of delay in construction projects: A quantitative analysis. Engineering, Construction and Architectural Management, 27(4), pp. 917-935. ISSN 0969-9988

Villa, J and Ariaratnam, S T (2013) Project management functions for the light industrial sector in Mexico. International Journal of Construction Education and Research, 9(3), pp. 163-182. ISSN 1557-8771

Vo, H M; Yang, J B and Rangasamy, V (2025) A comprehensive review of delay analysis techniques for solving concurrent delays. Engineering, Construction and Architectural Management, 32(5), pp. 3495-3521. ISSN 0969-9988

Volker, L; Scharpff, J C D; de Weerdt, M M and Herder, P M (2012) Designing a dynamic network-based approach for asset management activities. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Wambeke, B W; Liu, M and Hsiang, S M (2012) Using Pajek and centrality analysis to identify a social network of construction trades. Journal of Construction Engineering and Management, 138(10), pp. 1192-1201. ISSN 0733-9364

Wamsler, C and Brink, E (2016) The urban domino effect: A conceptualization of cities' interconnectedness of risk. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 80-113. ISSN 1759-5916

Wang, S.; Hu, X.; Wei, A.; Yang, W. and Cui, Q. (2026) The non-linear impact of industrial agglomeration on green total factor productivity in construction: Moderating role of construction consulting services. Engineering, Construction and Architectural Management, 33(15), pp. 458-480. ISSN 0969-9988

Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364

Wang, C; Li, B; Li, B and Baldwin, A (2017) Case study of "project controlling" on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(6), pp. 862-874. ISSN 0969-9988

Wang, C H and Huang, Y C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(1), pp. 5-16. ISSN 01446193

Wang, H; Yang, Q; Liu, Q; Zhao, C and Zhou, W (2024) Automatic planning for cable crane operations in concrete dam construction. Journal of Construction Engineering and Management, 150(12): 04024177, ISSN 0733-9364

Wang, J (2022) BIM and construction dispute management. PhD thesis, University of Manchester, UK.

Wang, J; Han, C and Li, X (2023) Modified streamlined optimization algorithm for time-cost tradeoff problems of complex large-scale construction projects. Journal of Construction Engineering and Management, 149(5): 04023022, ISSN 0733-9364

Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988

Wang, T K; Ford, D N; Chong, H Y and Zhang, W (2018) Causes of delays in the construction phase of Chinese building projects. Engineering, Construction and Architectural Management, 25(11), pp. 1534-1551. ISSN 0969-9988

Wang, W C and Demsetz, L A (2000) Application example for evaluating networks considering correlation. Journal of Construction Engineering and Management, 126(6), pp. 467-474. ISSN 0733-9364

Wang, Y; Zhu, S and Wong, A S T (2014) Cooling time estimation of newly placed hot-mix asphalt pavement in different weather conditions. Journal of Construction Engineering and Management, 140(5): 04014009, ISSN 0733-9364

Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.

Wang, Z; Hu, H and Gong, J (2018) Modeling worker competence to advance precast production scheduling optimization. Journal of Construction Engineering and Management, 144(11): 04018098, ISSN 0733-9364

Wang, Z; Liu, Y; Hu, H and Dai, L (2021) Hybrid rescheduling optimization model under disruptions in precast production considering real-world environment. Journal of Construction Engineering and Management, 147(4): 04021012, ISSN 0733-9364

Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation, 19(2), pp. 280-294. ISSN 1471-4175

Waugh, L M (1990) A construction planner. PhD thesis, Stanford University, USA.

Wetherington, L E (1992) The effect of variations in management techniques on construction productivity. PhD thesis, University of Florida, USA.

White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193

Whiteman, W E and Irwig, H G (1988) Disturbance scheduling technique for managing renovation work. Journal of Construction Engineering and Management, 114(2), pp. 191-213. ISSN 0733-9364

Wickramaratne, S; Wirasinghe, S C and Ruwanpura, J (2020) An update of proposed Sri Lanka warning system for East and West Coast tsunamis. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 169-186. ISSN 1759-5916

Williams, L M (2000) Strategic decision support for project portfolio management in the public sector. PhD thesis, University of California, Los Angeles, USA.

Williams, T J (2020) Relationships between cost estimates, scheduling and project success in the construction sector. PhD thesis, Walden University, USA.

Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364

Woldesenbet, A; Jeong, D H S and Oberlender, G D (2012) Daily work reports-based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), pp. 481-490. ISSN 0733-9364

Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.

Wong, T; Wei, Y; Zeng, Y; Jie, Y and Zhao, X (2025) A novel real-time torque prediction of epb shield in mixed ground using machine learning method based on geological knowledge fusion. Journal of Construction Engineering and Management, 151(3): 04025005, ISSN 0733-9364

Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.

Woolery, J C and Crandall, K C (1983) Stochastic network model for planning scheduling. Journal of Construction Engineering and Management, 109(3), pp. 342-354. ISSN 0733-9364

Wu, Z.; Park, A.; Awada, M. and Assaad, R. H. (2026) School building conditions and chronic absenteeism within socioeconomic contexts: A component-level statistical analysis in New York state. Engineering, Construction and Architectural Management, 33(15), pp. 432-457. ISSN 0969-9988

Wu, K and García De Soto, B (2021) Lifting sequence optimization of luffing tower cranes considering motion paths with dynamic programming. Journal of Construction Engineering and Management, 147(10): 04021126, ISSN 0733-9364

Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364

Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333. ISSN 0969-9988

Xie, H; Hong, Y and Brilakis, I (2022) Analysis of user needs in time-related risk management for holistic project understanding. Journal of Construction Engineering and Management, 148(4): 05022002, ISSN 0733-9364

Xie, L L; Chen, Y; Wu, S; Chang, R D and Han, Y (2024) Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(7), pp. 2852-2877. ISSN 0969-9988

Xu, X (2024) A multi-agent reinforcement learning task allocation framework for navigation sequences of construction robots. PhD thesis, New York University Tandon School of Engineering, USA.

Xue, J; Shen, G Q; Yang, R J; Zafar, I; Ekanayake, E M A C; Lin, X and Darko, A (2020) Influence of formal and informal stakeholder relationship on megaproject performance: A case of China. Engineering, Construction and Architectural Management, 27(7), pp. 1505-1531. ISSN 0969-9988

Yadav, H; Soni, U and Kumar, G (2023) Analysing challenges to smart waste management for a sustainable circular economy in developing countries: A fuzzy DEMATEL study. Smart and Sustainable Built Environment, 12(2), pp. 361-384. ISSN 2046-6099

Yamin, R A (2001) Cumulative effect of productivity rates in linear schedules. PhD thesis, Purdue University, USA.

Yamín, R A and Harmelink, D J (2001) Comparison of linear scheduling model (LSM) and critical path method (CPM). Journal of Construction Engineering and Management, 127(5), pp. 374-381. ISSN 0733-9364

Yan, H.; Liu, C.; Yang, X.; Li, X. and Li, J. (2026) Digital twin-enabled 3D near-misses prediction method based on trajectories and postures for proactive construction safety management. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988

Yang, I T (2005) Chance-constrained time-cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), pp. 1002-1012. ISSN 0733-9364

Yang, I T (2007) Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis. Journal of Construction Engineering and Management, 133(7), pp. 498-505. ISSN 0733-9364

Yang, I T and Ioannou, P G (2004) Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, 22(6), pp. 619-630. ISSN 01446193

Yang, J B and Chen, Y F (2025) S-curve adjustment approaches for a force majeure event: COVID-19 as an example. Engineering, Construction and Architectural Management, 32(3), pp. 1621-1642. ISSN 0969-9988

Yang, J B and Tsai, M K (2011) Computerizing ICBF method for schedule delay analysis. Journal of Construction Engineering and Management, 137(8), pp. 583-591. ISSN 0733-9364

Yang, J B and Yin, P C (2009) Isolated collapsed but-for delay analysis methodology. Journal of Construction Engineering and Management, 135(7), pp. 570-578. ISSN 0733-9364

Yang, L R (2007) Exploring the links between technology usage and project outcomes. Construction Management and Economics, 25(10), pp. 1041-1051. ISSN 1466433X

Yang, Y; Pan, M and Pan, W (2022) Integrated offsite logistics scheduling approach for high-rise modular building projects. Journal of Construction Engineering and Management, 148(6): 04022032, ISSN 0733-9364

Yang, Y C; Park, C J; Kim, J H and Kim, J J (2007) Management of daily progress in a construction project of multiple apartment buildings. Journal of Construction Engineering and Management, 133(3), pp. 242-253. ISSN 0733-9364

Yao, Z; Zhang, L; Hua, Z and Luo, C (2025) Low-carbon multiobjective optimization for repetitive projects based on crew-based scheduling strategy. Journal of Construction Engineering and Management, 151(1): 04024183, ISSN 0733-9364

Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531

Yates, J K (1993) Construction decision support system for delay analysis. Journal of Construction Engineering and Management, 119(2), pp. 226-244. ISSN 0733-9364

Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Yazdi, Alireza Jalali (2022) Developing an integrated design support framework to enable mass-customisation in multi-storey timber building projects. PhD thesis, University of Technology Sydney, Australia.

Yeganeh, A A; Azizi, M and Falsafi, R (2019) Root causes of design-construction interface problems in Iranian design-build projects. Journal of Construction Engineering and Management, 145(12): 05019014, ISSN 0733-9364

Yeoh, K-W (2012) Construction requirements driven planning and scheduling. PhD thesis, National University of Singapore, Singapore.

Yi, K J and Langford, D (2006) Scheduling-based risk estimation and safety planning for construction projects. Journal of Construction Engineering and Management, 132(6), pp. 626-635. ISSN 0733-9364

Yi, K J; Lee, H S and Choi, Y K (2002) Network creation and development for repetitive-unit projects. Journal of Construction Engineering and Management, 128(3), pp. 257-264. ISSN 0733-9364

Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599

Yin, J; Li, J; Yang, A and Cai, S (2024) Optimization of service scheduling problem for overlapping tower cranes with cooperative coevolutionary genetic algorithm. Engineering, Construction and Architectural Management, 31(3), pp. 1348-1369. ISSN 0969-9988

Yin, X; Bouferguene, A and Al-Hussein, M (2020) Data-driven sewer pipe data random generation and validation. Journal of Construction Engineering and Management, 146(12): 04020131, ISSN 0733-9364

Yong-Woo, K and Rhee, B-D (2024) Incentive-based coordination for scheduled delivery in prefab construction. Construction Management and Economics, 42(7), pp. 624-639. ISSN 01446193

Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364

Yu, M; Ruan, W; Zhou, Y and Zhao, Y (2025) Flow shop scheduling for prefabricated components production considering parallel machines and buffer constraints. Journal of Construction Engineering and Management, 151(4): 04025010, ISSN 0733-9364

Yu, M; Wang, L; Ruan, W and Zheng, W (2025) Robust optimization for precast component production scheduling considering component transfer. Journal of Construction Engineering and Management, 151(10): 04025156, ISSN 0733-9364

Yuan, Z; Chang, Y; Chen, Y; Wang, Y; Huang, W and Chen, C (2024) Simulating and optimizing precast wall lifting in prefabricated building construction. Engineering, Construction and Architectural Management, 31(6), pp. 2437-2456. ISSN 0969-9988

Yun Zhen, G W; Wai Wah, L; Sui Pheng, L and Shi Yee, W (2026) Application of building information modelling (BIM) technology in risk management of high-rise building (hrb) projects in Malaysia. International Journal of Construction Management, 26(2), pp. 332-348. ISSN 1562-3599

Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.

Zaalouk, A; Altaf, M S and Han, S (2025) Operations-oriented supply chain master planning in panelized construction using hybrid multiagent simulation. Journal of Construction Engineering and Management, 151(10): 04025206, ISSN 0733-9364

Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Zagia, F.; Kajewski, S.; Omrani, S. and Motamedisedeh, O. (2026) Prioritizing the key causes of construction project delay in different countries: A cross-sectional analysis of different project types. International Journal of Construction Management, 26(9), pp. 1879-1904. ISSN 1562-3599

Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364

Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.

Zarei, F; Arashpour, M; Mirnezami, S A; Shahabi-Shahamiri, R and Ghasemi, M (2024) Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study. International Journal of Construction Management, 24(8), pp. 820-833. ISSN 1562-3599

Zarghami, S A (2022) Prioritizing construction activities: Addressing the flaws of schedule-based indexes. Journal of Construction Engineering and Management, 148(8): 04022069, ISSN 0733-9364

Zarghami, S A (2024) No scheduling problem but rather a rescheduling problem: Measuring robustness of schedule network in construction projects. Journal of Construction Engineering and Management, 150(2): 04023157, ISSN 0733-9364

Zarghami, S A and Zwikael, O (2024) Buffer allocation in construction projects: a disruption mitigation approach. Engineering, Construction and Architectural Management, 31(10), pp. 3946-3972. ISSN 0969-9988

Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988

Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364

Zayed, T M (2001) Assessment of productivity for concrete bored pile construction. PhD thesis, Purdue University, USA.

Zayed, T M and Halpin, D W (2004) Simulation as a tool for pile productivity assessment. Journal of Construction Engineering and Management, 130(3), pp. 394-404. ISSN 0733-9364

Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364

Zayed, T M and Halpin, D W (2005) Deterministic models for assessing productivity and cost of bored piles. Construction Management and Economics, 23(5), pp. 531-543. ISSN 01446193

Zech, W C (2004) Enhancing work zone safety. PhD thesis, State University of New York at Buffalo, USA.

Zeng, N; Liu, Y and König, M (2023) 4D BIM-enabled look-ahead scheduling for early warning of off-site supply chain disruptions. Journal of Construction Engineering and Management, 149(1): 04022154, ISSN 0733-9364

Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X

Zeng, Z (2007) Coordinated rescheduling of precast production. PhD thesis, National University of Singapore, Singapore.

Zhang, C (2017) Human-centered automation for resilience in acquiring construction field information. PhD thesis, Arizona State University, USA.

Zhang, H; Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(2), pp. 159-169. ISSN 01446193

Zhang, H; Li, H and Tam, C M (2006) Particle swarm optimization for preemptive scheduling under break and resource-constraints. Journal of Construction Engineering and Management, 132(3), pp. 259-267. ISSN 0733-9364

Zhang, H; Li, L; Demeulemeester, E; Bai, S and Zhang, J (2025) Heuristic methods for dynamic multiproject scheduling problems with stochastic transfer times. Journal of Construction Engineering and Management, 151(2): 04024207, ISSN 0733-9364

Zhang, L; Dai, G; Zou, X and Qi, J (2020) Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Engineering, Construction and Architectural Management, 27(10), pp. 3095-3113. ISSN 0969-9988

Zhang, L; Pan, C and Zou, X (2013) Criticality comparison between the repetitive scheduling method and the network model. Journal of Construction Engineering and Management, 139(10): 06013004, ISSN 0733-9364

Zhang, L and Qi, J (2012) Controlling path and controlling segment analysis in repetitive scheduling method. Journal of Construction Engineering and Management, 138(11), pp. 1341-1345. ISSN 0733-9364

Zhang, L; Zou, X and Kan, Z (2014) Improved strategy for resource allocation in repetitive projects considering the learning effect. Journal of Construction Engineering and Management, 140(11): 4014053, ISSN 0733-9364

Zhang, N and Tiong, R (2003) Integrated electronic commerce model for the construction industry. Journal of Construction Engineering and Management, 129(5), pp. 578-585. ISSN 0733-9364

Zhang, W; Xue, N; Zhang, J and Zhang, X (2021) Identification of critical causal factors and paths of tower-crane accidents in China through system thinking and complex networks. Journal of Construction Engineering and Management, 147(12): 04021174, ISSN 0733-9364

Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364

Zhao, J. and Xu, Z. (2026) A generalizable deep reinforcement learning-based algorithm for priority rule scheduling in stochastic resource-constrained project scheduling. Journal of Construction Engineering and Management, 152(9): 04026156, ISSN 0733-9364

Zhao, J (2014) Performance modeling and optimization solutions for networking systems. PhD thesis, University of Hong Kong, Hong Kong.

Zhao, Y; Chen, W; Arashpour, M; Yang, Z; Shao, C and Li, C (2022) Predicting delays in prefabricated projects: Sd-bp neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29(4), pp. 1753-1776. ISSN 0969-9988

Zhao, Y; Jing, H; Yu, M and Li, J (2025) Efficient project management of historical building groups: a BIM-based approach with critical chain method and 5D simulation. International Journal of Construction Management, 25(7), pp. 826-839. ISSN 1562-3599

Zhao, Z Y; You, W Y and Zuo, J (2010) Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. Journal of Construction Engineering and Management, 136(9), pp. 1056-1060. ISSN 0733-9364

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(1), pp. 81-91. ISSN 0733-9364

Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364

Zhong, B; Shen, L; Pan, X; Zhong, X and He, W (2024) Dispute classification and analysis: Deep learning-based text mining for construction contract management. Journal of Construction Engineering and Management, 150(1): 04023151, ISSN 0733-9364

Zhong, D H and Zhang, J S (2003) New method for calculating path float in program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 129(5), pp. 501-506. ISSN 0733-9364

Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.

Zhou, C; Li, R; Xiong, X; Li, J and Gao, Y (2023) Optimization of triage time and sample delivery path in health infrastructure to combat COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3620-3644. ISSN 0969-9988

Zhou, T; Zhu, Q; Shi, Y and Du, J (2022) Construction robot teleoperation safeguard based on real-time human hand motion prediction. Journal of Construction Engineering and Management, 148(7): 04022040, ISSN 0733-9364

Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.

Zhou, W (2023) Condition state-based decision making in evolving systems: Applications in asset management and delivery. PhD thesis, George Mason University, USA.

Zhou, Xiaoyan (2023) A reinforcement learning neural network approach to online optimization of construction manufacturing processes. PhD thesis, University of Florida, USA.

Zhu, J; Zhang, C; Yuan, J; Pan, W; Xue, J and Lou, F (2025) An improved model for precast component transportation scheduling under dynamic traffic and weather conditions. Journal of Construction Engineering and Management, 151(11): 04025181, ISSN 0733-9364

Zhu, L and Cheung, S O (2021) Toward an equity-based analysis of construction incentivization. Journal of Construction Engineering and Management, 147(11): 04021148, ISSN 0733-9364

Zhu, X (2023) Machine learning supported multiple criteria decision making for project delivery system selection. PhD thesis, Queen's University Belfast, UK.

Zohrehvandi, S. (2026) A sustainable project scheduling algorithm in construction; an approach to using project buffer management techniques. International Journal of Construction Education and Research, 22(2), pp. 331-359. ISSN 1557-8771

Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(6), pp. 1129-1150. ISSN 0969-9988

Zohrehvandi, S; Vanhoucke, M; Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(2), pp. 502-524. ISSN 0969-9988

Zoleykani, M. J. and Abbasianjahromi, H. (2026) Integrating ar and 4D-BIM for dynamic hazard management in construction projects. International Journal of Construction Management, 26(7), pp. 1239-1263. ISSN 1562-3599

Zou, H and Zhou, G (2024) Multimode variable resource-constrained time/cost trade-off problem in repetitive projects with adjustment strategy. International Journal of Construction Management, 24(12), pp. 1271-1281. ISSN 1562-3599

Zou, X and Rong, Z (2025) Resource-constrained repetitive project scheduling with soft logic. Engineering, Construction and Architectural Management, 32(4), pp. 2397-2429. ISSN 0969-9988

Zou, X; Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(6), pp. 1713-1738. ISSN 0969-9988

Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988

Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.

Zouein, P P and Tommelein, I D (2001) Improvement algorithm for limited space scheduling. Journal of Construction Engineering and Management, 127(2), pp. 116-124. ISSN 0733-9364

Zu, L and Liao, W (2025) Reinforcement learning-based multiobjective and multiconstraint production scheduling for precast concrete. Journal of Construction Engineering and Management, 151(8): 04025089, ISSN 0733-9364

Zuo, F; Zio, E and Yuan, Y (2022) Risk-response strategy optimization considering limited risk-related resource allocation and scheduling. Journal of Construction Engineering and Management, 148(11): 04022123, ISSN 0733-9364

Zwikael, O; Salmona, M; Meredith, J and Zarghami, S A (2023) Enhancing project stakeholder communication under insufficient knowledge of project management concepts. Engineering, Construction and Architectural Management, 30(10), pp. 5007-5029. ISSN 0969-9988

ng, S T; Skitmore, M; Deng, M Z M and Nadeem, A (2004) Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation, 4(1), pp. 3-17. ISSN 1471-4175

zhao, X. and lu, R. (2025) Dynamic scheduling optimization model and algorithm for linear projects considering local rescheduling. Engineering, Construction and Architectural Management, 33(5), pp. 4019-4045. ISSN 0969-9988

Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364

Ökmen, Ö and Öztaş, A (2008) Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), pp. 49-63. ISSN 0733-9364

This list was generated on Sat Aug 22 02:36:04 2026 UTC.