Items with Subject: operations management
Abbott, C and Allen, S (2004) Exploring how regional construction activity can be supported by community benefit initiatives. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City. PhD thesis, University of Newcastle upon Tyne, UK.
Abdalla, S B; Mushtaha, E; Rashid, M; Opoku, A; Hamad, R; Dweiri, F and Elmualim, A (2023) Pre-design CSFs (critical success factors) of building projects for dubai's development boom. Built Environment Project and Asset Management, 13(3), pp. 359-374. ISSN 2044-124X
Abdel-Wahab, M S; Dainty, A R J; Ison, S G; Bowen, P and Hazlehurst, G (2008) Trends of skills and productivity in the UK construction industry. Engineering, Construction and Architectural Management, 15(4), pp. 372-382. ISSN 0969-9988
Abdelhamid, T S (1999) Measuring and evaluating physiological demands of construction work. PhD thesis, University of Michigan, USA.
Abdelhamid, T S and Everett, J G (1999) Physiological demands of concrete slab placing and finishing work. Journal of Construction Engineering and Management, 125(1), pp. 47-52. ISSN 0733-9364
Abdelhamid, T S and Everett, J G (1999) Time series analysis for construction productivity experiments. Journal of Construction Engineering and Management, 125(2), pp. 87-95. ISSN 0733-9364
Abdelhamid, T S and Everett, J G (2002) Physiological demands during construction work. Journal of Construction Engineering and Management, 128(5), pp. 427-437. ISSN 0733-9364
Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599
Abdou, A; Lewis, J and Alzarooni, S (2004) Modelling risk for construction cost estimating and forecasting: A review. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Abduh, M; Sukardi, S N; Wirahadikusumah, R D; Oktaviani, C Z and Bahagia, S N (2023) Maturity of procurement units for public construction projects in Indonesia. International Journal of Construction Management, 23(13), pp. 2171-2184. ISSN 1562-3599
AbdulLateef, O; Sanmargaraja, S; Oni, O; Anavhe, P and Mewomo, C M (2024) An association rule mining model for the application of construction technologies during COVID-19. International Journal of Construction Management, 24(4), pp. 443-453. ISSN 1562-3599
Abdulhadi, N H (1997) Simulation as a tool for re-engineering construction processes. PhD thesis, University of Colorado at Boulder, USA.
Abdullah, A H; Yaman, S K; Mohammad, H and Hassan, P F (2018) Construction manager's technical competencies in Malaysian construction projects. Engineering, Construction and Architectural Management, 25(2), pp. 153-177. ISSN 0969-9988
Abdullah, F (1999) The Malaysian construction industry: an analysis on the impact of Vision 2020. PhD thesis, University of Reading, UK.
Abdulrahman, A (2010) The development of a performance measurement framework for FE/HE co-location construction projects. PhD thesis, Heriot-Watt University, UK.
Abedmousa, M (2023) Reframing construction labour productivity in a colonisation context: the West Bank as an example. PhD thesis, University of Westminster, UK.
Aboagye-Nimo, E; Painting, N and Piroozfar, P (2024) Picking up where we left off: A 'temporary' safety culture. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Abotaleb, I S and El-Adaway, I H (2018) First attempt toward a holistic understanding of the interdependent rippled impacts associated with out-of-sequence work in construction projects: System dynamics modeling approach. Journal of Construction Engineering and Management, 144(9): 04018084, ISSN 0733-9364
Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity. PhD thesis, University of Wisconsin - Madison, USA.
Abraham, D M (1990) A state-based framework using indicators for construction monitoring and evaluation. PhD thesis, University of Maryland, College Park, USA.
Abubakar, A (1992) A quantitative approach to cost monitoring and control of construction projects. PhD thesis, Loughborough University, UK.
Abudu, H. D.; Mewomo, M. C.; Adjei, K. O. and Bondinuba, F. K. (2026) An emergency response framework for improving crisis management in facilities: PLS-SEM approach. International Journal of Disaster Resilience in the Built Environment, ISSN 1759-5908
Abuharris, A and Ruddock, L (2005) Land-use planning and sustainable tourism development in Libya. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Abuwarda, Z and Hegazy, T (2016) Flexible activity relations to support optimum schedule acceleration. Journal of Construction Engineering and Management, 142(11): 06016004, ISSN 0733-9364
Abuwarda, Z; Mostafa, K; Morita, P and Hegazy, T (2024) Optimizing construction work-rest schedules and worker reassignment utilizing wristband physiological data. Journal of Construction Engineering and Management, 150(11): 04024149, ISSN 0733-9364
Acharya, P; Sharma, K; Pokharel, G R and Adhikari, R (2022) Reviewing the progress of reconstruction five years after the 2015 gorkha earthquake, Nepal. Building Research & Information, 50(6), pp. 595-609. ISSN 0961-3218
Adah, C A; Aghimien, D O and Oshodi, O (2025) Work–life balance in the construction industry: A bibliometric and narrative review. Engineering, Construction and Architectural Management, 32(1), pp. 38-58. ISSN 0969-9988
Adebowale, O J (2018) A multi-stakeholder approach to productivity improvement in the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.
Adebowale, O J and Agumba, J N (2023) A meta-analysis of factors affecting construction labour productivity in the middle East. Journal of Construction in Developing Countries, 28(1), pp. 193-220. ISSN 1823-6499
Adebowale, O J and Agumba, J N (2024) Applications of augmented reality for construction productivity improvement: A systematic review. Smart and Sustainable Built Environment, 13(3), pp. 479-495. ISSN 2046-6099
Adedokun, O and Egbelakin, T (2025) Understanding householders' perceptions of threats following the 2019/2020 black summer bushfires in Australia. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 209-223. ISSN 1759-5908
Adekanye, O G (2019) Evaluation of building policies, programs, and potential for energy efficiency in the United States. PhD thesis, Carnegie Mellon University, USA.
Adeniyi, O; Rathnasiri, P; Thurairajah, N and Ojo, L D (2022) Enhancing property resilience to flood: Lessons learned from the recovery of flooded hospitality premises. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Adio, Obafemi Adekunle (2022) An automated knowledge-based decision support system for managing non-conformances on australia's large infrastructure projects. PhD thesis, University of Melbourne, Australia.
Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects. PhD thesis, University of Strathclyde, UK.
Adzroe, E K (2015) A study of e-business technology transfer via foreign direct investment in the Ghanaian construction industry. PhD thesis, University of Salford, UK.
Afshar, M R; Shahhosseini, V and Sebt, M H (2022) A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(3), pp. 357-365. ISSN 1562-3599
Agbo, E A; Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), pp. 109-125. ISSN 1823-6499
Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193
Agyekum, K; Goodier, C and Oppon, J A (2022) Key drivers for green building project financing in Ghana. Engineering, Construction and Architectural Management, 29(8), pp. 3023-3050. ISSN 0969-9988
Agyekum, K; Kukah, A S and Amudjie, J (2022) The impact of COVID-19 on the construction industry in Ghana: The case of some selected firms. Journal of Engineering, Design and Technology, 20(1), pp. 222-244. ISSN 1726-0531
Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.
Ahlstrand, R (2022) Structures of subcontracting: Work organisation, control, and labour in the Swedish building sector. PhD thesis, Lund University, Sweden.
Ahmad, A M (2014) The use of refurbishment, flexibility, standardisation and BIM to support the design of a change-ready healthcare facility. PhD thesis, Loughborough University, UK.
Ahmad Basri, S A; Syed Zakaria, S A; A.Majid, T and Yusop, Z (2022) Exploring awareness and application of disaster risk management cycle (drmc) from stakeholder's perspective. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 470-483. ISSN 1759-5916
Ahmed, A; Mohammed, H A; Gambatese, J and Hurwitz, D (2021) Effects of flashing blue lights mounted on paving equipment on vehicle speed behavior in work zones. Journal of Construction Engineering and Management, 147(9): 04021101, ISSN 0733-9364
Ahmed, I (2016) Housing and resilience: Case studies from the Cook Islands. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 489-500. ISSN 1759-5916
Ahmed, S (2022) Risk management framework an analysis of risk management process in SMEs of the UK construction industry. PhD thesis, University of the West of Scotland, UK.
Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.
Ahmed, T; Hossain, S M and Hossain, M A (2021) Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling. International Journal of Construction Management, 21(4), pp. 404-415. ISSN 1562-3599
Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry. PhD thesis, Nottingham Trent University, UK.
Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: Current research status. Construction Innovation, 4(1), pp. 19-31. ISSN 1471-4175
Aigbavboa, C and Thwala, W (2014) An assessment of critical success factors for the reduction of the cost of poor quality from construction projects in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Aijazi, O (2015) Social repair and structural inequity: Implications for disaster recovery practice. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 454-467. ISSN 1759-5916
Ajayi, S O; Jones, W and Unuigbe, M (2019) Occupational stress management for UK construction professionals: Understanding the causes and strategies for improvement. Journal of Engineering, Design and Technology, 17(4), pp. 819-832. ISSN 1726-0531
Aje, I O; Oladinrin, T O and Nwaole, A N C (2016) Factors influencing success rate of contractors in competitive bidding for construction works in South-East, Nigeria. Journal of Construction in Developing Countries, 21(1), pp. 19-34. ISSN 1823-6499
Akampurira, E and Windapo, A (2019) Key quality attributes of design documentation: South African perspective. Journal of Engineering, Design and Technology, 17(2), pp. 362-382. ISSN 1726-0531
Akande, I.; Opoko, A. P. and Adewolu, A. O. (2026) Exploring the relationships between emerging technologies and design process in Nigerian architectural firms. Engineering, Construction and Architectural Management, pp. 1-21. ISSN 0969-9988
Akdede, N.; Ay, B. Ö and Dino, İ G. (2026) Rethinking the second life of post-disaster and post-conflict temporary housing. Buildings & Cities, 7(1), pp. 488-503. ISSN 2632-6655
Akindele, M A (2024) Development and evaluation of portable reduced-complexity air quality models for policy assessment in Africa. PhD thesis, Carnegie Mellon University, USA.
Akinlolu Temisola, M; Oladimeji Benedict, O and Haupt, T C (2021) A scientometric review and meta-analysis of the health and safety of women in construction: Structure and research trends. Journal of Engineering, Design and Technology, 19(2), pp. 446-466. ISSN 1726-0531
Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(2), pp. 105-113. ISSN 01446193
Akintoye, A; Bowen, P and Hardcastle, C (1998) Macro-economic leading indicators of construction contract prices. Construction Management and Economics, 16(2), pp. 159-175. ISSN 01446193
Akintoye, A and Sommerville, J (1995) Distributed lag relationships between UK construction orders and output. Construction Management and Economics, 13(1), pp. 33-42. ISSN 01446193
Akintoye, S A (1991) Construction tender price index: modelling and forecasting trends. PhD thesis, University of Salford, UK.
Aktas, C B (2011) Impact of product lifetime on life cycle assessment results. PhD thesis, University of Pittsburgh, USA.
Al Bunni, A (2020) Refurbishment of UK state school buildings: a strategy and framework for BIM-based digital twinning. PhD thesis, De Montfort University, UK.
Al Khatib, B A (2021) Determining the delay factors for reconstructed mega-project’s phases and the associated challenges. PhD thesis, University of Malaya, Malaysia.
Al Rfoa, S K; Jaafar, M and Mohd Raslim, F (2023) Influences of high-performance work practices on trust in organisation in Jordanian construction firms. International Journal of Construction Management, 23(10), pp. 1715-1725. ISSN 1562-3599
Al Taie, Mohsin Shareef (2022) Applications of lean in construction: Benefits from using the Last Planner system. PhD thesis, Liberty University, USA.
Al-Barghouthi, M T (2010) Capturing tacit knowledge in the construction industry in Saudi Arabia. DM thesis, University of Phoenix, USA.
Al-Bayati, A J and Panzer, L (2020) Reducing damages to underground utilities: Importance of stakeholders' behaviors. Journal of Construction Engineering and Management, 146(9): 04020107, ISSN 0733-9364
Al-Fares, M A (1995) On the development of an integrated system for the automation of on-site reinforced concrete construction. PhD thesis, University of Wisconsin - Madison, USA.
Al-Hajj, A and Hamani, K (2011) Material waste in the UAE construction industry: Main causes and minimization practices. Architectural Engineering and Design Management, 7(4), pp. 221-235. ISSN 1745-2007
Al-Kaisy, A and Nassar, K (2005) Nighttime construction issues revisited. Journal of Construction Research, 6(1), pp. 139-156. ISSN 1609-9451
Al-Nasser, A A (2001) Optimisation of construction implemented as a manufacturing process. PhD thesis, University of Sussex, UK.
Al-Otaibi, N T N H (1995) A knowledge-based systems approach to materials management for large construction projects. PhD thesis, University of Toronto, Canada.
Al-Saleh, H A (1991) A program to improve construction productivity in the construction industry in Saudi Arabia. DEngr thesis, University of Kansas, USA.
Al-Sehali, J (2001) A framework for total quality management in the construction industry in Bahrain. PhD thesis, Loughborough University, UK.
Al-Shabbani, Z; Taherpour, F and Dadi, G B (2026) Development and short-term evaluation of a pretask safety briefing tool for highway construction and maintenance crews. Journal of Construction Engineering and Management, 152(5): 04026048, ISSN 0733-9364
Al-Shabbani, Z (2019) Improving safety performance of highway maintenance crews through pre-task safety toolbox talks. PhD thesis, University of Kentucky, USA.
Al-Sudairi, A A (2007) Evaluating the effect of construction process characteristics to the applicability of lean principles. Construction Innovation, 7(1), pp. 99-121. ISSN 1471-4175
Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.
Al-Zarooni, S (1997) Developing the construction industry in the United Arab Emirates with special reference to Abu Dhabi. PhD thesis, University of London, University College London, UK.
AlAbbadi, G (2020) Development of a framework towards enhancing workers productivity in the Jordanian construction industry. PhD thesis, Coventry University, UK.
AlMaian, R Y; Needy, K L; Walsh, K D and Alves, T D C L (2016) A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects. Journal of Construction Engineering and Management, 142(2): 04015061, ISSN 0733-9364
Alazzaz, F and Whyte, A (2015) Linking employee empowerment with productivity in off-site construction. Engineering, Construction and Architectural Management, 22(1), pp. 21-37. ISSN 0969-9988
Albagoury, S. H. and AbdelMaksoud, K. M. (2026) Integrating socio-economic impact assessment into the reconstruction plan for Derna, Libya. International Journal of Disaster Resilience in the Built Environment, pp. 1-13. ISSN 1759-5908
Albeaino, G; Eiris, R; Gheisari, M and Issa, R R (2022) Dronesim: A VR-based flight training simulator for drone-mediated building inspections. Construction Innovation, 22(4), pp. 831-848. ISSN 1471-4175
Albert, A; Hallowell, M R and Kleiner, B M (2014) Enhancing construction hazard recognition and communication with energy-based cognitive mnemonics and safety meeting maturity model: Multiple baseline study. Journal of Construction Engineering and Management, 140(2): 04013042, ISSN 0733-9364
Albert, I (2020) A lean production approach to materials management in the Nigerian construction industry. PhD thesis, Nelson Mandela University, South Africa.
Albouwarthan, M A (2020) Prolonged heat exposure and health outcomes among construction workers in Saudi Arabia. DSc thesis, University of Massachusetts Lowell, USA.
Alenazi, E O N (2018) Using BIM for delay management in public sector construction projects in KSA. PhD thesis, Loughborough University, UK.
Alexandrou, K; Thravalou, S and Artopoulos, G (2024) Heritage-BIM for energy simulation: A data exchange method for improved interoperability. Building Research & Information, 52(3), pp. 373-386. ISSN 0961-3218
Alfieri, E; Seghezzi, E; Sauchelli, M; Di Giuda, G M and Masera, G (2020) A BIM-based approach for DfMA in building construction: Framework and first results on an Italian case study. Architectural Engineering and Design Management, 16(4), pp. 247-269. ISSN 1745-2007
Alhamami, A (2021) Standardized qualification framework for achieving energy efficiency training for BIM. PhD thesis, Cardiff University, UK.
Alhusban, M (2018) Conceptual procurement framework for building information modelling uptake to enhance buildings' sustainability performance in the Jordanian public sector. PhD thesis, University of Portsmouth, UK.
Ali, A H; Kineber, A F; Elyamany, A; Ibrahim, A H and Daoud, A O (2025) Application of Ginni's mean analysis for identifying the stationary driver enhancing modular construction adoption in the building industry. International Journal of Construction Management, 25(3), pp. 322-333. ISSN 1562-3599
Ali, K N (2004) Towards an online knowledge management system for reactive maintenance projects. PhD thesis, University of Salford, UK.
Ali, R A; Mannakkara, S and Wilkinson, S (2020) Factors affecting successful transition between post-disaster recovery phases: A case study of 2010 floods in Sindh, Pakistan. International Journal of Disaster Resilience in the Built Environment, 11(5), pp. 597-614. ISSN 1759-5916
Ali, S A A; Arun, C and Krishnamurthy, K (2021) Re-defining flow in construction process for facilitating the identification and quantification of generic overruns existing in construction industry today. International Journal of Construction Management, 21(2), pp. 113-130. ISSN 1562-3599
Aliu, J; Oke, A E; Oluwasogo Oyediran, A; Kanya, R A and Ukaha Onyeukwu, S (2026) From isolation to interaction: Evaluating social media awareness and adoption in a developing construction industry. Smart and Sustainable Built Environment, 15(1), pp. 273-293. ISSN 2046-6099
Alkaabi, J A (1994) Improved materials management using automatic identification techniques. PhD thesis, Loughborough University, UK.
Alkoc, E and Erbatur, F (1998) Site expert: A prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(3), pp. 238-251. ISSN 0969-9988
Allan, P and Bryant, M (2014) The attributes of resilience: A tool in the evaluation and design of earthquake-prone cities. International Journal of Disaster Resilience in the Built Environment, 5(2), pp. 109-129. ISSN 1759-5916
Alleem, R (2012) A usability based model for suggestion system evaluation of infrastructure organisations in the UAE. PhD thesis, University of Salford, UK.
Allen, C and Smallwood, J (2008) Improving construction planning through 4D planning. Journal of Engineering, Design and Technology, 6(1), pp. 7-20. ISSN 1726-0531
Allison, L and Kaminsky, J (2017) Safety communication networks: Females in small work crews. Journal of Construction Engineering and Management, 143(8): 04017050, ISSN 0733-9364
Allmon, E; Haas, C T; Borcherding, J D and Goodrum, P M (2000) U.S. Construction labor productivity trends, 1970-1998. Journal of Construction Engineering and Management, 126(2), pp. 97-104. ISSN 0733-9364
Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.
Almatari, H A Q; Chan, M and Masrom, M A N (2024) Factors inhibiting the adoption of industrial revolution 4.0 in malaysian construction industry. Smart and Sustainable Built Environment, 13(4), pp. 1041-1065. ISSN 2046-6099
Almusharraf, A and Whyte, A (2016) Task-based defect management: Anatomical classification. Built Environment Project and Asset Management, 6(3), pp. 345-358. ISSN 2044-124X
Alqahtani, B M A (2022) Influence of work-related stressors on safety performance on construction sites in the Kingdom of Saudi Arabia. PhD thesis, Western Michigan University, USA.
Alruwaythi, O (2017) Influence of engineering information format, demographics, and spatial cognition on craft worker performance. PhD thesis, University of Colorado at Boulder, USA.
Alruwaythi, O F (2017) Influence of engineering information format, demografics and spatial cognition on craft worker performance. PhD thesis, University of Colorado at Boulder, USA.
Alsamadani, R; Hallowell, M and Javernick-Will, A N (2013) Measuring and modelling safety communication in small work crews in the US using social network analysis. Construction Management and Economics, 31(6), pp. 568-579. ISSN 1466433X
Alsamadani, R M (2013) Measuring, modeling, and assessing safety communication in construction crews in the US using social network analysis. PhD thesis, University of Colorado at Boulder, USA.
Alshboul, O and Shehadeh, A (2026) Adaptive integration of BIM and Navisworks for real-time clash detection using the XGBoost algorithm. Journal of Construction Engineering and Management, 152(1): 04025232, ISSN 0733-9364
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Altaf, A (2022) Integrating safety, security and human factors engineering in rail infrastructure design and evaluation. PhD thesis, Bournemouth University, UK.
Altalhoni, A; Liu, H; Abudayyeh, O; Kwigizile, V; Huang, W C and Kirkpatrick, K (2025) Robust forecasting models for highway construction cost indices during pandemic-era inflation. Journal of Construction Engineering and Management, 151(8): 04025101, ISSN 0733-9364
Altuwaijri, H A (2014) A study of the relationship between the use of GIS and project success in selected construction organizations. PhD thesis, Eastern Michigan University, USA.
Alves, T d C L; Neuman, Y; Walsh, K D; Needy, K L and AlMaian, R (2020) Highly effective companies in supplier quality surveillance practices: A quantitative analysis. Construction Management and Economics, 38(3), pp. 239-258. ISSN 01446193
Alzaed, A (2012) User centered passive building design. PhD thesis, University of Liverpool, UK.
Alzanati, A (2021) Complex building construction projects: reducing rework through facilitation of craftspeople's motivation in United Arab Emirates. PhD thesis, Bournemouth University, UK.
Alzohbi, M G M (2015) A framework for evaluating material management performance in Jordanian concrete building projects. PhD thesis, Sheffield Hallam University, UK.
Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599
Alzubi, K. M.; Alaloul, W. S.; Al Salaheen, M.; Musarat, M. A.; Baarimah, A. O. and Mushtaha, A. W. (2025) Indoor construction productivity assessment using computer vision and mask region-based convolutional neural networks. Construction Innovation, 26(5), pp. 1523-1555. ISSN 1471-4175
Amadi, C; Carrillo, P and Tuuli, M (2018) Stakeholder management in PPP projects: External stakeholders' perspective. Built Environment Project and Asset Management, 8(4), pp. 403-414. ISSN 2044-124X
Amaratunga, C A (2014) Building community disaster resilience through a virtual community of practice (VCOP). International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 66-78. ISSN 1759-5916
Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988
Ameen, J R M; Neale, R H and Abrahamson, M (2003) An application of regression analysis to quantify a claim for increased costs. Construction Management and Economics, 21(2), pp. 159-165. ISSN 01446193
Amin, K F and Abanda, F H (2019) Building information modelling plan of work for managing construction projects in Egypt. Journal of Construction in Developing Countries, 24(2), pp. 23-61. ISSN 1823-6499
Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193
Amorim, Adriana Eloa Bento (2020) Construction workers remote estimate of the wbgt index in outdoor activities on concrete slabs. PhD thesis, Universidade Estadual de Campinas, Brazil.
An, J; Luo, Q; Wang, Z; Pan, S; Qin, H and Yan, D (2026) An integrated resilience-based failure risk assessment method of highway tunnel operation and maintenance systems for fire accidents. Journal of Construction Engineering and Management, 152(4): 04026013, ISSN 0733-9364
An, J; Wang, Z; Pan, S; Qin, H; Luo, Q and Yan, D (2024) An integrated resilience and assessment methodology framework for addressing uncertainty in highway operation and maintenance systems. Journal of Construction Engineering and Management, 150(12): 04024174, ISSN 0733-9364
Andary, E G; Abi Shdid, C; Chowdhury, A and Ahmad, I (2020) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(3), pp. 609-633. ISSN 0969-9988
Andersen, Janthea (2010) An empirical study of design management practices in collaborative design and construction projects: The roles, activities and conceptions of design management across project stages and within the building, civil and process sectors of a construction company. PhD thesis, University of Queensland, Australia.
Ansari, R (2019) Dynamic simulation model for project change-management policies: Engineering project case. Journal of Construction Engineering and Management, 145(7): 05019008, ISSN 0733-9364
Ansell, M; Evans, R; Holmes, M; Price, A and Pasquire, C (2009) An application of the construction management framework in highways major maintenance. Engineering, Construction and Architectural Management, 16(2), pp. 162-174. ISSN 0969-9988
Anugwo, I C (2017) The sustainability of South African construction small, medium and micro enterprises. PhD thesis, Nelson Mandela Metropolitan University, South Africa.
Anumba, C (2006) Application of GIS to labour market planning in construction. EngD thesis, Loughborough University, UK.
Anumba, C J; Abdullah, A and Ruikar, K (2008) An integrated system for demolition techniques selection. Architectural Engineering and Design Management, 4(2), pp. 130-148. ISSN 1745-2007
Apipattanavis, S; Sabol, K; Molenaar, K R; Rajagopalan, B; Xi, Y; Blackard, B and Patil, S (2010) Integrated framework for quantifying and predicting weather-related highway construction delays. Journal of Construction Engineering and Management, 136(11), pp. 1160-1168. ISSN 0733-9364
Arai, K and Morimoto, E (2020) Renovation of the Japanese construction industry: Evaluation of i-Construction from the perspective of construction management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Arai, K and Morimoto, E (2021) What is required for recovering from disaster: Theoretical and empirical verification. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Arashpour, M; Heidarpour, A; Akbar Nezhad, A; Hosseinifard, Z; Chileshe, N and Hosseini, R (2020) Performance-based control of variability and tolerance in off-site manufacture and assembly: Optimization of penalty on poor production quality. Construction Management and Economics, 38(6), pp. 502-514. ISSN 01446193
Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2014) Analysis of disruptions caused by construction field rework on productivity in residential projects. Journal of Construction Engineering and Management, 140(2): 04013053, ISSN 0733-9364
Arata, S; Sugiuchi, M; Ikaga, T; Shiraishi, Y; Hayashi, T; Ando, S and Kawakubo, S (2024) Office environment and employee differences by company health management certification. Buildings & Cities, 5(1), pp. 723-743. ISSN 2632-6655
Arditi, D (1985) Construction productivity improvement. Journal of Construction Engineering and Management, 111(1), pp. 1-14. ISSN 0733-9364
Arditi, D; Akan, G T and Gurdamar, S (1985) Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(2), pp. 171-181. ISSN 01446193
Arditi, D; Ayrancioglu, M and Shi, J J (2005) Worker safety issues in night-time highway construction. Engineering, Construction and Architectural Management, 12(5), pp. 487-501. ISSN 0969-9988
Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193
Argyroudis, S A; Nasiopoulos, G; Mantadakis, N and Mitoulis, S A (2021) Cost-based resilience assessment of bridges subjected to earthquakes. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 209-222. ISSN 1759-5916
Aryal, A and Wilkinson, S (2020) The role of social capital in the recovery of cultural built heritage: Evidence from three heritage sites in Nepal. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 44-57. ISSN 1759-5916
Asadi, R; Rotimi, J O B and Wilkinson, S (2023) Analyzing underlying factors of rework in generating contractual claims in construction projects. Journal of Construction Engineering and Management, 149(6): 04023036, ISSN 0733-9364
Asadi, R; Wilkinson, S and Rotimi, J O B (2021) Towards contracting strategy usage for rework in construction projects: A comprehensive review. Construction Management and Economics, 39(12), pp. 953-971. ISSN 01446193
Asadi, R; Wilkinson, S and Rotimi, J O B (2023) Mixed-method approach to the evaluation of rework provisions within general contract conditions. Construction Economics and Building, 23(3-4), pp. 45-70. ISSN 2204-9029
Asadi, R; Wilkinson, S and Rotimi, J O B (2023) The common causes of rework in construction contracts: A diagnostic approach. Journal of Engineering, Design and Technology, 21(4), pp. 1107-1133. ISSN 1726-0531
Asadi, S; Sharghi, A; Mottaki, Z and Salehsedghpour, B (2023) Investigating the role of risk perception in place-based responses: Case studies of the 2003 bam and 2017 ezgeleh-sarpol zahab earthquakes. International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 349-365. ISSN 1759-5916
Asadi, S; Sharghi, A; Mottaki, Z and Salehsedghpour, B (2025) Housing reconstruction after traumatic events: A POE study of Bam housing after the 2003 earthquake, Iran. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 57-71. ISSN 1759-5908
Asgari, S (2016) Modeling construction competitive bidding: An agent-based approach. PhD thesis, Columbia University, USA.
Ashkanani, S (2023) Project management of large and complex-projects: The case of “lng megaprojects in the state of Qatar”. PhD thesis, Hamad Bin Khalifa University, Qatar.
Ashraf, Hassan (2018) Psychological conflict management climate in general contractor's project organization and its influence on project performance: exploring multiple psychosocial and behavioral pathways. PhD thesis, University of Hong Kong, Hong Kong.
Aslan, V Z (2012) Financial implications of engineering decisions. PhD thesis, Texas A&M University, USA.
Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2023) Key factors affecting labor productivity in offsite construction projects. Journal of Construction Engineering and Management, 149(1): 04022158, ISSN 0733-9364
Assadi, S O A (1997) An investigation of the records kept by supervisors on construction sites. PhD thesis, University of Newcastle upon Tyne, UK.
Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.
Attalla, M and Hegazy, T (2003) Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. Journal of Construction Engineering and Management, 129(4), pp. 405-411. ISSN 0733-9364
Austin, R B; Pishdad-Bozorgi, P and De La Garza, J M (2016) Identifying and prioritizing best practices to achieve flash track projects. Journal of Construction Engineering and Management, 142(2): 04015077, ISSN 0733-9364
Austin, S; Baldwin, A; Baizhan, L I and Waskett, P (2000) Analytical design planning technique (ADePT): A dependency structure matrix tool to schedule the building design process. Construction Management and Economics, 18(2), pp. 173-182. ISSN 01446193
Avrithi, K. (2026) Resilience of infrastructure for midsized cities against flooding: A case study. International Journal of Disaster Resilience in the Built Environment, pp. 1-16. ISSN 1759-5908
Awodele, O A (2012) Framework for managing risk in privately financed market projects in Nigeria. PhD thesis, Heriot-Watt University, UK.
Awolusi, I G and Marks, E D (2017) Safety activity analysis framework to evaluate safety performance in construction. Journal of Construction Engineering and Management, 143(3): 05016022, ISSN 0733-9364
Ayinla, K O; Cheung, F and Tawil, A R (2020) Demystifying the concept of offsite manufacturing method: Towards a robust definition and classification system. Construction Innovation, 20(2), pp. 223-246. ISSN 1471-4175
Ayodeji, F J (2014) Evaluation of site managers' hindrances towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(3), pp. 348-363.
Ayodele, E O (2017) Development of a framework in minimising errors in construction documents in Nigeria. PhD thesis, University of Salford, UK.
Ayus, A M B N (1992) Building contract claims: a comparative study (Scotland, England and Malaysia). PhD thesis, University of Aberdeen, UK.
Aziz, Z; Alzaabi, E and Syazli Fathi, M (2023) Prioritisation of resilience criteria and performance indicators for road emergencies crisis response: An analytic hierarchy process (AHP) approach. Journal of Financial Management of Property and Construction, 28(2), pp. 178-205. ISSN 1366-4387
Azman, M. A.; Chuweni, N. N.; Muhamad Halil, F.; Ku Azir, K. M. A.; Juhari, F. N.; Lee, B. L. and Skitmore, M. (2026) Market competition and construction firm productivity: The role of market regulation in a developing economy. Engineering, Construction and Architectural Management, 33(7), pp. 5760-5782. ISSN 0969-9988
Azman, M A; Lee, B L; Rahman, R A and Ballesteros-Pérez, P (2026) Ownership and contracting specialization: Unlocking the productivity of construction firms in hybrid market economies. Construction Management and Economics, 44(1), pp. 61-78. ISSN 0144-6193
Azman, M A; Abdul-Samad, Z; Lee, B L; Skitmore, M; Rajendra, D and Chuweni, N N (2024) How technological, environmental and managerial performance contribute to the productivity change of Malaysian construction firms. Engineering, Construction and Architectural Management, 31(2), pp. 618-637. ISSN 0969-9988
Azman, M A; Chuweni, N N; Halil, F M; Ku Mohammad Asyraf Ku, A; Lee, B L; Farah Nazira, J and Skitmore, M (2024) The impact of the change in institutional regulation on construction productivity: Firm-level evidence in a developing economy. Construction Management and Economics, 42(3), pp. 199-214. ISSN 01446193
Azman, M A; Hon, C K H; Skitmore, M; Lee, B L and Xia, B (2019) A meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: Evidence from Malaysia. Construction Management and Economics, 37(2), pp. 72-88. ISSN 01446193
Baarts, C (2009) Collective individualism: The informal and emergent dynamics of practising safety in a high-risk work environment. Construction Management and Economics, 27(10), pp. 949-957. ISSN 1466433X
Babatunde, S O; Udeaja, C and Adekunle, A O (2021) Barriers to BIM implementation and ways forward to improve its adoption in the Nigerian AEC firms. International Journal of Building Pathology and Adaptation, 39(1), pp. 48-71. ISSN 23984708
Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099
Back, W E (1994) Quantifying benefits of electronic technology applied to bulk materials management. PhD thesis, Clemson University, USA.
Baek, F; Sohn, J; Bae, J; Kim, D and Lee, S (2026) Physical, cognitive, and emotional responses and their interrelated effects on human-robot team performance in construction. Journal of Construction Engineering and Management, 152(1): 04025224, ISSN 0733-9364
Bai, S; Li, M; Lu, Q; Tian, H and Qin, L (2022) Global time optimization method for dredging construction cycles of trailing suction hopper dredger based on grey system model. Journal of Construction Engineering and Management, 148(2): 04021198, ISSN 0733-9364
Bajjou, M S and Chafi, A (2020) Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management, 20(7), pp. 783-800. ISSN 1562-3599
Baker, H; Smith, S; Masterton, G and Hewlett, B (2020) Data-led learning: Using natural language processing (NLP) and machine learning to learn from construction site safety failures. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Bakhtiari, S (2024) Multi-hazard risk assessment of the interconnected infrastructure systems. PhD thesis, University of Western Ontario, Canada.
Balali, A; Moehler, R C and Valipour, A (2022) Ranking cost overrun factors in the mega hospital construction projects using Delphi-swara method: An Iranian case study. International Journal of Construction Management, 22(13), pp. 2577-2585. ISSN 1562-3599
Balamurali Kanagaraj; Tattukolla Kiran; Anand N; Khalifa Al Jabri and Justin S (2023) Development and strength assessment of eco-friendly geopolymer concrete made with natural and recycled aggregates. Construction Innovation, 23(3), pp. 524-545. ISSN 1471-4175
Baldwin, A; Li, H; Huang, T; Kong, C W; Guo, H L; Chan, N and Wong, J (2009) Supporting pre-tender construction planning with virtual prototyping. Engineering, Construction and Architectural Management, 16(2), pp. 150-161. ISSN 0969-9988
Ball, M and Wood, A (1995) How many jobs does construction expenditure generate? Construction Management and Economics, 13(4), pp. 307-318. ISSN 01446193
Ballesteros-Pérez, P; del Campo-Hitschfeld, M L; González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621. ISSN 0969-9988
Bani Ismail, L (2012) An evaluation of the implementation of total quality management within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.
Bani Ismail, Loiy (2012) An evaluation of the implementation of total quality management (TQM) within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.
Banik, G C (2001) Construction productivity improvement: Current US perspective. Journal of Construction Procurement, 7(2), pp. 60-71. ISSN 1358-9180
Banks, C; Kotecha, R; Curtis, J; Dee, C; Pitt, N and Papworth, R (2018) Enhancing high-rise residential construction through design for manufacture and assembly: A UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 164-174. ISSN 17514304
Barbarosoglu, B V (2018) Early detection of maintainability issues in MEP systems using BIM. PhD thesis, Illinois Institute of Technology, USA.
Barcia, R M (1985) Construction production planning and optimal control. PhD thesis, University of Waterloo, Canada.
Barker, R; Childerhouse, P; Naim, M; Masat, J and Wilson, D (2004) Potential of total cycle time compression in construction: Focus on program development and design. Journal of Construction Engineering and Management, 130(2), pp. 177-187. ISSN 0733-9364
Barlow, C (2012) The Code for Sustainable Homes: what are the innovation implications for the social housing development sector? PhD thesis, University of Salford, UK.
Barlow, P L (2015) Assessment of subcontractor quality on California hospital construction projects through third-party inspections. PhD thesis, University of Florida, USA.
Barton, D A (1988) The effects of step changes on the construction industry: A study of the reaction of construction industries to change. PhD thesis, University of Reading, UK.
Basford, J L (2000) Earned value reporting for the department of energy. PhD thesis, Walden University, USA.
Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364
Bashouri, J and William, D G (2014) A model for sharing knowledge in architectural firms. Construction Innovation, 14(2), pp. 168-185. ISSN 1471-4175
Bates, W and Dawood, N N (1998) Development of a risk allocation strategy for construction in the process industry: A knowledge approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Baughan, R and Crapper, M (2016) Competence management in the UK heritage railway industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Bavafa, M (2015) Enhancing information quality through building information modelling implementation within UK structural engineering organisations. PhD thesis, University of Salford, UK.
Baxter, R J (2008) Middle range theorizing about information technology impact: A study of 3D CAD impact on construction work practices. PhD thesis, Case Western Reserve University, USA.
Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.
Bayona Malo, A A (2025) Evidence-based strategies to define, differentiate, and prevent serious injury and fatality exposure in construction. PhD thesis, University of Colorado at Boulder, USA.
Bayrak, T and Kaka, A (2004) Evaluation of digital photogrammetry and 3D CAD modelling applications in construction management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Beadle, K (2008) Analysis of the design process for low-energy housing. PhD thesis, De Montfort University, UK.
Bearup, W K (1995) An environment to support computer-assisted design review. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Becker, P E (2000) Modeling construction worker chemical exposures for compliance with OSHA permissible exposure limits: An investigation of lead exposures to highway bridge maintenance workers. DSc thesis, University of Massachusetts Lowell, USA.
Behar, C B (2016) A socio-technical perspective of ventilation practices in UK social housing with whole house ventilation systems: design, everyday life and change. PhD thesis, University College London, UK.
Bell, L C and Stukhart, G (1986) Attributes of materials management systems. Journal of Construction Engineering and Management, 112(1), pp. 14-21. ISSN 0733-9364
Bell, L C and Stukhart, G (1987) Costs and benefits of materials management systems. Journal of Construction Engineering and Management, 113(2), pp. 222-234. ISSN 0733-9364
Beran, V and Dlask, P (2007) Nonlinear optimisation and rational cash flow. Engineering, Construction and Architectural Management, 14(3), pp. 277-292. ISSN 0969-9988
Berg, R and Hinze, J (2005) Theft and vandalism on construction sites. Journal of Construction Engineering and Management, 131(7), pp. 826-833. ISSN 0733-9364
Bernold, L E (2002) Spatial integration in construction. Journal of Construction Engineering and Management, 128(5), pp. 400-408. ISSN 0733-9364
Bernold, L E and Treseler, J F (1991) Vendor analysis for best buy in construction. Journal of Construction Engineering and Management, 117(4), pp. 645-658. ISSN 0733-9364
Best, R (2010) Using purchasing power parity to assess construction productivity. Construction Economics and Building, 10(4), pp. 1-10. ISSN 2204-9029
Betts, M (1987) British public expenditure on construction less than claimed? Construction Management and Economics, 5(1), pp. 13-20. ISSN 01446193
Beyh, S (2004) Computer and communication engineering: internet protocol telephony in construction. PhD thesis, University of Salford, UK.
Bhattacharya, K.; Sarkar, D. and Solanki, A. (2026) Evaluation of road safety factors in Indian urban cities using CFPR and fuzzy DEMATEL. International Journal of Construction Management, 26(10), pp. 2058-2084. ISSN 1562-3599
Bibby, L; Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(1), pp. 7-26. ISSN 0969-9988
Bickerton, M and Louis Gruneberg, S (2013) The London interbank offered rate (LIBOR) and UK construction industry output 1990-2008. Journal of Financial Management of Property and Construction, 18(3), pp. 268-281. ISSN 1366-4387
Bijleveld, F R; Miller, S R and Dorée, A G (2015) Making operational strategies of asphalt teams explicit to reduce process variability. Journal of Construction Engineering and Management, 141(5): 04015002, ISSN 0733-9364
Birgonul, M T; Dikmen, I and Demirel, T (2005) Decision support tool for the quantification of fault rates in construction fall accidents. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Biswas, A (2019) Exploring Indian post-disaster temporary housing strategy through a comparative review. International Journal of Disaster Resilience in the Built Environment, 10(1), pp. 14-35. ISSN 1759-5916
Blackburn, S K (2001) Understanding project managers at work. PhD thesis, University of Reading, UK.
Blay, K B (2017) Resilience in projects: definition, dimensions, antecedents and consequences. PhD thesis, Loughborough University, UK.
Blyth, K; Lewis, J and Kaka, A (2004) Developing a framework for a standardized works programme for building projects. Construction Innovation, 4(4), pp. 193-210. ISSN 1471-4175
Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.
Boehm, S and Kopec, D (2016) Interior design as a post-disaster team partner. International Journal of Disaster Resilience in the Built Environment, 7(3), pp. 276-289. ISSN 1759-5916
Bogus, S M (2004) Concurrent engineering strategies for reducing design delivery time. PhD thesis, University of Colorado at Boulder, USA.
Bogus, S M; Diekmann, J E; Molenaar, K R; Harper, C; Patil, S and Lee, J S (2011) Simulation of overlapping design activities in concurrent engineering. Journal of Construction Engineering and Management, 137(11), pp. 950-957. ISSN 0733-9364
Boissonneault, A and Peters, T (2023) Concepts of performance in post-occupancy evaluation post-probe: A literature review. Building Research & Information, 51(4), pp. 369-391. ISSN 0961-3218
Bon, R and Hutchinson, K (2000) Sustainable construction: Some economic challenges. Building Research & Information, 28(5-6), pp. 310-314. ISSN 0961-3218
Bond, S (2015) Residents' perceptions of risk towards residential property in Canterbury NZ subsequent to the earthquakes. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 234-267. ISSN 1759-5916
Bonham, D R; Goodrum, P M; Littlejohn, R and Albattah, M A (2017) Application of data mining techniques to quantify the relative influence of design and installation characteristics on labor productivity. Journal of Construction Engineering and Management, 143(8): 04017052, ISSN 0733-9364
Bonwetsch, T (2015) Robotically assembled brickwork: Manipulating assembly processes of discrete elements. DSc thesis, ETH Zürich, Switzerland.
Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective. PhD thesis, University of Wisconsin - Madison, USA.
Borba, Maria Lucia Guilherme (2014) Technical-scientific and sociopolitical aspects of urban water management: Stormwater drainage in the city of São Paulo. PhD thesis, Universidade de São Paulo, Brazil.
Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques. Building Research & Information, 33(4), pp. 347-352. ISSN 0961-3218
Borg Axisa, G and Borg, R P (2024) Climate change adaptation in Malta: Assessment of skills in the built environment. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 668-679. ISSN 1759-5916
Bougrain, F (2012) Energy performance and public private partnership. Built Environment Project and Asset Management, 2(1), pp. 41-55. ISSN 2044-124X
Boukamp, F (2006) Modeling of and reasoning about construction specifications to support automated defect detection. PhD thesis, Carnegie Mellon University, USA.
Boussaa, Y; Dodoo, A; Nguyen, T and Rupar-Gadd, K (2024) Comprehensive renovation of a multi-apartment building in Sweden: Techno-economic analysis with respect to different economic scenarios. Building Research & Information, 52(4), pp. 463-478. ISSN 0961-3218
Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.
Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218
Bowen, R M (1978) Valuation of capitalized interest on construction expenditures in the electric utility industry. PhD thesis, Stanford University, USA.
Bower, D A (1995) The creation of a proactive link between time and money. PhD thesis, University of Manchester, UK.
Bowers, C T (2019) The next generation of residential construction: Adoption of green building programs, environmentally certified wood products and the transparency of environmental friendliness. PhD thesis, University of Washington, USA.
Bowlby, R L and Schriver, W R (1986) Observations on productivity and composition of building construction output in the United States, 1972-82. Construction Management and Economics, 4(1), pp. 1-18. ISSN 01446193
Braimah, N; Ndekugri, I and Gameson, R (2007) A systematic methodology for analysing disruption claims. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Brand, M C and Davenport, P (2012) Adjudication in Australia: An analysis of the amendments introduced by the building and construction industry Security of Payment Amendment Act 2010 (NSW). International Journal of Law in the Built Environment, 4(3), pp. 189-202. ISSN 1756-1469
Brchner, J and Olofsson, T (2012) Construction productivity measures for innovation projects. Journal of Construction Engineering and Management, 138(5), pp. 670-677. ISSN 0733-9364
Bridgewater, C (1992) A new approach to the design of buildings for automated construction. PhD thesis, University of Reading, UK.
Briscoe, G (2006) How useful and reliable are construction statistics? Building Research & Information, 34(3), pp. 220-229. ISSN 0961-3218
Brockman, J L (2014) Interpersonal conflict in construction: Cost, cause, and consequence. Journal of Construction Engineering and Management, 140(2): 04013050, ISSN 0733-9364
Brooks, T; Gunning, J G; Spillane, J P and Cole, J (2021) Regulatory decoupling and the effectiveness of the ISO 9001 quality management system in the construction sector in the UK–a case study analysis. Construction Management and Economics, 39(12), pp. 988-1005. ISSN 01446193
Brosque, C; Skeie, G and Fischer, M (2021) Comparative analysis of manual and robotic concrete drilling for installation hangers. Journal of Construction Engineering and Management, 147(3): 05021001, ISSN 0733-9364
Brown, C and Gorgolewski, M (2015) Understanding the role of inhabitants in innovative mechanical ventilation strategies. Building Research & Information, 43(2), pp. 210-221. ISSN 0961-3218
Brown, C; Milke, M and Seville, E (2010) Waste management as a "lifeline"? A New Zealand case study analysis. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 192-206. ISSN 1759-5916
Brown, D C (2003) A methodology for selecting the construction team. PhD thesis, University of Southampton, UK.
Brownlie, S M and Harris, F C (1987) A review of finance for large-scale construction. Construction Management and Economics, 5(2), pp. 115-121. ISSN 01446193
Bruen, J; Spillane, J P and Brooks, T (2020) Post-disaster affordable and sustainable house design and delivery: An international non-governmental organisation (INGO) perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Bruen, J; Spillane, J P and Brooks, T (2021) Community orientated post-disaster sustainable housing recovery, rebuilding and community renewal: Sri Lanka case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.
Bruun, E P G (2024) Structural scaffold-free cooperative robotic fabrication. PhD thesis, Princeton University, USA.
Bu-Bushait, K A (1984) A descriptive examination of the relationships between the application of project management techniques and project characteristics. PhD thesis, Georgia State University, USA.
Buckingham, P (2007) International process plant contracts for use on other performance-based projects. Construction Management and Economics, 25(7), pp. 709-713. ISSN 1466433X
Burati, J L; Farrington, J J and Ledbetter, W B (1992) Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), pp. 34-49. ISSN 0733-9364
Burbridge, A and Troutbeck, R (2017) Zero roadworker harm: Ethical and legal challenges. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 77-84. ISSN 17514304
Burnard, M D and Kutnar, A (2020) Human stress responses in office-like environments with wood furniture. Building Research & Information, 48(3), pp. 316-330. ISSN 0961-3218
Böhme, T; Escribano, A; Heffernan, E E and Beazley, S (2018) Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector. Built Environment Project and Asset Management, 8(3), pp. 253-266. ISSN 2044-124X
Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988
Caldas, C H; Kim, J Y; Haas, C T; Goodrum, P M and Zhang, D (2015) Method to assess the level of implementation of productivity practices on industrial projects. Journal of Construction Engineering and Management, 141(1): 04014061, ISSN 0733-9364
Caldas, C H; Torrent, D G and Haas, C T (2006) Using global positioning system to improve materials-locating processes on industrial projects. Journal of Construction Engineering and Management, 132(7), pp. 741-749. ISSN 0733-9364
Callaghan, N; Avery, T and Mulville, M (2017) Smart motorway' innovation for achieving greater safety and hard shoulder management. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Calvert, J; Price, V; Winch, C; Clarke, L; Sahin-Dikmen, M; Bilodeau, P L and Dionne, E (2026) Climate literacy and labour agency in vocational education and training. Buildings & Cities, 7(1), pp. 378-395. ISSN 2632-6655
Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.
Cameron, I; Gillan, G and Duff, A R (2007) Issues in the selection of fall prevention and arrest equipment. Engineering, Construction and Architectural Management, 14(4), pp. 363-374. ISSN 0969-9988
Campbell, J M and Smith, S D (2006) Improving industrial value and longevity of safety management research. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Carollo, Federica Carla (2023) Circularity in the construction and demolition waste management chain. PhD thesis, Politecnico di Milano, Italy.
Carr, R I (2000) Construction congestion cost (CO3) basic model. Journal of Construction Engineering and Management, 126(2), pp. 105-113. ISSN 0733-9364
Carter, K (2005) ConSus: a decision support tool for the procurement of sustainable social housing. PhD thesis, Heriot-Watt University, UK.
Casanovas-Rubio, M D M; Armengou, J and Ramos, G (2014) Occupational risk index for assessment of risk in construction work by activity. Journal of Construction Engineering and Management, 140(1): 04013035, ISSN 0733-9364
Castaneda-Maza, J A (2002) Workers' skills and receptiveness to operate under the Tier II construction management strategy. PhD thesis, University of Texas at Austin, USA.
Castañeda, J A; Tucker, R L and Haas, C T (2005) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Journal of Construction Engineering and Management, 131(7), pp. 799-807. ISSN 0733-9364
Chahrour, R; Hafeez, M A; Ahmad, A M; Sulieman, H I; Dawood, H; Rodriguez-Trejo, S; Kassem, M; Naji, K K and Dawood, N (2021) Cost-benefit analysis of BIM-enabled design clash detection and resolution. Construction Management and Economics, 39(1), pp. 55-72. ISSN 01446193
Chalker, M and Loosemore, M (2016) Trust and productivity in Australian construction projects: A subcontractor perspective. Engineering, Construction and Architectural Management, 23(2), pp. 192-210. ISSN 0969-9988
Champion, R (2011) A consideration of recovery of prolongation costs in a construction context. International Journal of Law in the Built Environment, 3(3), pp. 237-251. ISSN 1756-1450
Chan, A P C; Chiang, Y H; Mak, S W K; Choy, L H T and James, M W W (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(1), pp. 3-19. ISSN 1471-4175
Chan, A P C; Wong, J M W and Chiang, Y H (2003) Modelling labour demand at project level: An empirical study in Hong Kong. Journal of Engineering, Design and Technology, 1(2), pp. 135-150. ISSN 1726-0531
Chan, A P C; Yang, Y and Darko, A (2018) Construction accidents in a large-scale public infrastructure project: Severity and prevention. Journal of Construction Engineering and Management, 144(10): 05018010, ISSN 0733-9364
Chan, A P C; Yang, Y; Wong, F K W; Chan, D W M and Lam, E W M (2015) Wearing comfort of two construction work uniforms. Construction Innovation, 15(4), pp. 473-492. ISSN 1471-4175
Chan, C F P (2001) The development of construction law in singapore. PhD thesis, University of London, UK.
Chan, D W M (1998) Modelling construction durations for public housing projects. PhD thesis, University of Hong Kong, Hong Kong.
Chan, I Y S and Leung, M Y (2011) Impact of stress on injury incidents among construction workers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Chan, K-W (2010) The transaction costs and the choice of contractual arrangements in the construction industry in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Chan, M (2011) Fatigue: The most critical accident risk in oil and gas construction. Construction Management and Economics, 29(4), pp. 341-353. ISSN 1466433X
Chan, P (2002) Factors affecting labour productivity in the construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chan, P and Kaka, A (2003) A blue-collar insight into improving construction labour productivity. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Chan, P and Kaka, A (2004) Construction productivity measurement: A comparison of two case studies. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Chan, P W (2011) Queer(y)ing construction: Exploring sexuality and masculinity in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Chan, P W (2013) Queer eye on a 'straight' life: Deconstructing masculinities in construction. Construction Management and Economics, 31(8), pp. 816-831. ISSN 1466433X
Chan, P W and McCabe, S (2010) Emerging disparities: Exploring the impacts of the financial crisis on the UK construction labour market. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Chan, S L (2002) Responses of selected economic indicators to construction output shocks: The case of Singapore. Construction Management and Economics, 20(6), pp. 523-533. ISSN 01446193
Chan, T K (2011) Comparison of precast construction costs: Case studies in Australia and Malaysia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Chan, T K and Gao, S (2019) Can we really measure construction productivity? In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Chancellor, W and Lu, W (2016) A regional and provincial productivity analysis of the Chinese construction industry: 1995 to 2012. Journal of Construction Engineering and Management, 142(11): 05016013, ISSN 0733-9364
Chang, A S; Du, S J and Shen, F Y (2012) Engineer self-evaluation checklist for effective site visits. Journal of Construction Engineering and Management, 138(10), pp. 1220-1229. ISSN 0733-9364
Chang, C J and Yu, S W (2018) Three-variance approach for updating earned value management. Journal of Construction Engineering and Management, 144(6): 04018045, ISSN 0733-9364
Chang, L M and Borcherding, J D (1986) Craftsman questionnaire sampling. Journal of Construction Engineering and Management, 112(4), pp. 543-556. ISSN 0733-9364
Chang, L-M (1983) Evaluation and improvement of craftsman questionnaire in measuring construction productivity. PhD thesis, University of Texas at Austin, USA.
Chang, Y; Wilkinson, S; Potangaroa, R and Seville, E (2012) Managing resources in disaster recovery projects. Engineering, Construction and Architectural Management, 19(5), pp. 557-580. ISSN 0969-9988
Chang, Y; Wilkinson, S; Seville, E and Potangaroa, R (2012) Changes in resource need for post-disaster reconstruction: A longitudinal study in China. Building Research & Information, 40(3), pp. 327-336. ISSN 0961-3218
Chang Recavarren, L G (2023) Establishing the effect of building design on construction work. PhD thesis, Arizona State University, USA.
Chaparro, D A; Ying, F J; Rotimi, F E and Egbelakin, T (2020) Commute and labour productivity: Investigation of inner city construction sites. Journal of Engineering, Design and Technology, 18(5), pp. 1305-1319. ISSN 1726-0531
Chapman, R and Howden-Chapman, P (2021) Does reframing urban policy around wellbeing support carbon mitigation? Buildings & Cities, 2(1), pp. 688-699. ISSN 2632-6655
Charef, R (2019) A BIM-based framework to integrate a sustainable end-of-life into the asset lifecycle: towards the circular economy. PhD thesis, Coventry University, UK.
Charles, Q W; Sospeter, N G; Kikwasi, G and Chileshe, N (2024) Attraction and retention factors for female students into construction-related programs in developing countries: The case of Tanzania. International Journal of Construction Education and Research, 20(3), pp. 263-283. ISSN 15578771
Charlesraj, V P C; Maheswari, J U; Kalidindi, S N and Varghese, K (2004) Knowledge management for planning construction projects using dependency structure matrix. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Chau, A D; Hoang, H T and Nguyen, L D (2025) Web-based decision support system for automated pavement design and life-cycle cost analysis. Journal of Construction Engineering and Management, 151(8): 05025004, ISSN 0733-9364
Chau, K W (1998) The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong. Engineering, Construction and Architectural Management, 5(1), pp. 38-50. ISSN 0969-9988
Chau, K W and Walker, A (1988) The measurement of total factor productivity of the Hong Kong construction industry. Construction Management and Economics, 6(3), pp. 209-224. ISSN 01446193
Chaudhari, R; Goodrum, P; Brady, N; Jones, M; Hallowell, M; Yeh, T and Bhandari, S (2025) Exploring the impact of augmented reality on work performance in a full-scale MEP assembly task: Study of industry and novice populations. Journal of Construction Engineering and Management, 151(12): 04025189, ISSN 0733-9364
Che Ibrahim, C K I and Belayutham, S (2020) A knowledge, attitude and practices (KAP) study on prevention through design: A dynamic insight into civil and structural engineers in Malaysia. Architectural Engineering and Design Management, 16(2), pp. 131-149. ISSN 1745-2007
Cheetham, D W (1982) Labour management practices on construction sites and some of their consequences. Construction Papers, 1(3), pp. 37-53. ISSN 0144-8587
Chelson, D E (2010) The effects of building information modeling on construction site productivity. PhD thesis, University of Maryland, College Park, USA.
Chen, B; Mao, C K and Hu, J L (2015) The optimal debt ratio of public-private partnership projects. International Journal of Construction Management, 15(3), pp. 239-253. ISSN 1562-3599
Chen, C (2016) Crane planning optimization for construction. PhD thesis, National University of Singapore, Singapore.
Chen, C; Zhang, Y; Xiao, B; Cheng, M; Zhang, J and Li, H (2024) Deep learning-based image steganography for visual data cybersecurity in construction management. Journal of Construction Engineering and Management, 150(10): 04024125, ISSN 0733-9364
Chen, C-H (2003) Integrated management of highway maintenance and traffic. PhD thesis, University of Maryland, College Park, USA.
Chen, H and Chan, I Y S (2024) Effects of automation and transparency on human psychophysiological states and perceived system performance in construction safety automation: An electroencephalography experiment. Journal of Construction Engineering and Management, 150(7): 04024055, ISSN 0733-9364
Chen, Q and Jin, R (2012) Safety4site commitment to enhance jobsite safety management and performance. Journal of Construction Engineering and Management, 138(4), pp. 509-519. ISSN 0733-9364
Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.
Chen, X (2019) Big data in construction project management: prospects and challenges. PhD thesis, University of Hong Kong, Hong Kong.
Chen, Y (2008) A highway work zone design and traffic management decision system. PhD thesis, University of Wisconsin - Madison, USA.
Chen, Y; Fang, Q and Lan, Y (2025) Development of a modular assembling, suspended, and sliding scaffold. Journal of Construction Engineering and Management, 151(9): 04025131, ISSN 0733-9364
Chen, Y and Kamara, J M (2005) The use of mobile computing in construction information management. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Chen, Z; Abdullah, A B; Anumba, C J and Li, H (2014) Anp experiment for demolition plan evaluation. Journal of Construction Engineering and Management, 140(2): 06013005, ISSN 0733-9364
Cheng, M-Y (1992) Automated site layout of temporary construction facilities using geographic information systems (GIS). PhD thesis, University of Texas at Austin, USA.
Cheung, C M; Bowen, P; Cattell, K and Davis, J (2019) Measuring what counts: Workplace well-being of project professionals. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Chew, A T W and Ling, F Y Y (2002) Increasing Singapore's construction productivity through construction process re-engineering. Journal of Construction Research, 3(1), pp. 123-45. ISSN 1609-9451
Chia, F C; Skitmore, M; Gray, J and Bridge, A (2018) International comparisons of nominal and real construction labour productivity. Engineering, Construction and Architectural Management, 25(7), pp. 896-915. ISSN 0969-9988
Chia, F C; Skitmore, M; Runeson, G and Bridge, A (2012) An analysis of construction productivity in Malaysia. Construction Management and Economics, 30(12), pp. 1055-1069. ISSN 1466433X
Chia, F C; Skitmore, M; Runeson, G and Bridge, A (2014) Economic development and construction productivity in Malaysia. Construction Management and Economics, 32(9), pp. 874-887. ISSN 01446193
Chia, Fah Choy (2011) Economic fluctuations and productivity in the Malaysian construction sector. PhD thesis, Queensland University of Technology, Australia.
Chiang, Y H; Tang, B S and Leung, W Y (2001) Market structure of the construction industry in Hong Kong. Construction Management and Economics, 19(7), pp. 675-687. ISSN 01446193
Chih, Y Y; Kiazad, K; Cheng, D; Lajom, J A L and Restubog, S L D (2017) Feeling positive and productive: Role of supervisor-worker relationship in predicting construction workers' performance in the Philippines. Journal of Construction Engineering and Management, 143(8): 04017049, ISSN 0733-9364
Chih, Y Y; Kiazad, K; Li, M; Capezio, A; Zhou, L and Restubog, S L D (2017) Broken promises: Implications for the job insecurity and job performance of Chinese construction workers. Journal of Construction Engineering and Management, 143(4): 04016114, ISSN 0733-9364
Chileshe, N and Dzisi, E (2012) Benefits and barriers of construction health and safety management (HSM): Perceptions of practitioners within design organisations. Journal of Engineering, Design and Technology, 10(2), pp. 276-298. ISSN 1726-0531
Chin, C S (2009) Process capability and performance improvement. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Chiu H.N, T D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(1), pp. 55-66. ISSN 01446193
Chmielewski, H T (2023) Overcoming modeling barriers in long-term interdependent infrastructure systems planning. PhD thesis, North Carolina State University, USA.
Cho, C; Kim, K; Park, J and Cho, Y K (2018) Data-driven monitoring system for preventing the collapse of scaffolding structures. Journal of Construction Engineering and Management, 144(8): 04018077, ISSN 0733-9364
Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.
Cho, Y; Kabassi, K; Pyeon, J H; Choi, K; Wang, C and Norton, T (2013) Effectiveness study of methods for removing temporary pavement markings in roadway construction zones. Journal of Construction Engineering and Management, 139(3), pp. 257-266. ISSN 0733-9364
Choe, S and Leite, F (2017) Assessing safety risk among different construction trades: Quantitative approach. Journal of Construction Engineering and Management, 143(5): 04016133, ISSN 0733-9364
Choi, C Y and Honda, R (2019) Motive and conflict in the disaster recovery process: Housing reconstruction in Sri Lanka after the 2004 Indian ocean tsunami. International Journal of Disaster Resilience in the Built Environment, 10(5), pp. 408-419. ISSN 1759-5916
Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.
Choi, J O; Chen, X B and Kim, T W (2019) Opportunities and challenges of modular methods in dense urban environment. International Journal of Construction Management, 19(2), pp. 93-105. ISSN 1562-3599
Choi, S D (2008) Postural balance and adaptations in transitioning sloped surfaces. International Journal of Construction Education and Research, 4(3), pp. 189-199. ISSN 1557-8771
Choi, Seogjae (2024) Addressing material-related issues in industrial construction projects: The state of supplier involvement in project planning and the barriers to information sharing. PhD thesis, University of Texas at Austin, USA.
Chomicka, B A (2013) Drivers and cost implications of quality failures in commercial offices. PhD thesis, Glasgow Caledonian University, UK.
Chong, W K O (2005) Construction production rate information system for highway projects. PhD thesis, University of Texas at Austin, USA.
Chong, W-h B (2016) A process-data supported input-output framework for delineating the embodied emissions of Hong Kong construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Choudhry, R M; Gabriel, H F; Khan, M K and Azhar, S (2017) Causes of discrepancies between design and construction in the Pakistan construction industry. Journal of Construction in Developing Countries, 22(2), pp. 1-18. ISSN 1823-6499
Choudhury, T (2014) Masculinities, feminities and gender relations in contemporary Bangladesh: an analysis of the construction sector in Sylhet. PhD thesis, University of Hull, UK.
Christiansen, T R (1994) Modeling efficiency and effectiveness of coordination in engineering design teams. PhD thesis, Stanford University, USA.
Christodoulou, S E; Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(3), pp. 229-240. ISSN 1466433X
Chua, D K H and Godinot, M (2006) Use of a WBS matrix to improve interface management in projects. Journal of Construction Engineering and Management, 132(1), pp. 67-79. ISSN 0733-9364
Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364
Chuang, J (2014) The changing foundations of Chinese development: From low-cost labor to land dispossession. PhD thesis, University of California, Berkeley, USA.
Cirelli Jr., L R (2017) Impact of design fees and duration of design process on construction quality: Implications for quality management. PhD thesis, Baker College (Michigan), USA.
Clarke, L and Wall, C (1998) UK construction skills in the context of European developments. Construction Management and Economics, 16(5), pp. 553-567. ISSN 01446193
Clements-Croome, D (2005) Designing the indoor environment for people. Architectural Engineering and Design Management, 1(1), pp. 45-55. ISSN 1745-2007
Clifford-Lindkvist, C and Elmualim, A (2008) The socio-technical shaping of innovation in facilities management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Cockerill, J E (1993) The construction industry in belfast 1800-1914. PhD thesis, Queen's University Belfast, UK.
Codarin, Sara (2020) Innovative construction systems within building processes: An approach to large-scale robotic additive layer manufacturing for the conservation of cultural heritage. PhD thesis, University of Ferrara, Italy.
Coenen, T B J; Volker, L and Visscher, K (2021) Introducing circular innovation in the construction industry: The case of the circular viaduct. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Coggins, Jeremy Keith (2012) A proposal for harmonisation of security of payment legislation in the Australian building and construction industry. PhD thesis, University of Adelaide, Australia.
Colbert, E and Aboagye-Nimo, E (2021) The role of prosody and personality type on effective team formation. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Cole, L J R (1991) Construction scheduling: Principles, practices, and six case studies. Journal of Construction Engineering and Management, 117(4), pp. 579-588. ISSN 0733-9364
Conroy, G (1997) CONSERV: A methodology for the management of capital projects and concurrent engineering design using knowledge based technology. PhD thesis, Cranfield University, UK.
Cooke, T and Lingard, H (2011) A retrospective analysis of work-related deaths in the Australian construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Cooper, Arthur Ashley (1971) An economic study of housing production and associated works in Australia. PhD thesis, University of New South Wales, Australia.
Correa-Velez, I; McMichael, C and Conteh, A (2014) Levels of social trust among men from refugee backgrounds after the 2011 Queensland floods. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 318-328. ISSN 1759-5916
Cotgrave, A J (2008) Achieving literacy in sustainability: shifting the paradigm for construction management education. PhD thesis, Liverpool John Moores University, UK.
Cotton, A P; Sohail, M and Scott, R E (2005) Towards improved labour standards for construction of minor works in low income countries. Engineering, Construction and Architectural Management, 12(6), pp. 617-632. ISSN 0969-9988
Cottrell, D S (1995) Enhancing construction productivity through continuous process improvements. PhD thesis, Texas A&M University, USA.
Cottrell, D S (2006) Contractor process improvement for enhancing construction productivity. Journal of Construction Engineering and Management, 132(2), pp. 189-196. ISSN 0733-9364
Counter, B J (2013) Development of innovative approaches for life extension of railway track systems. PhD thesis, University of South Wales, UK.
Cox, I D; Morris, J P; Rogerson, J H and Jared, G E (1999) A quantitative study of post contract award design changes in construction. Construction Management and Economics, 17(4), pp. 427-439. ISSN 01446193
Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(1), pp. 91-100. ISSN 01446193
Crawford, L; Langston, C and Bajracharya, B (2012) Building capability for disaster resilience. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Crawford, L; Langston, C and Bajracharya, B (2013) Participatory project management for improved disaster resilience. International Journal of Disaster Resilience in the Built Environment, 4(3), pp. 317-333. ISSN 1759-5916
Crawford, P and Vogl, B (2006) Measuring productivity in the construction industry. Building Research & Information, 34(3), pp. 208-219. ISSN 0961-3218
Cuce, A P M (2016) Innovative heating, cooling and ventilation technologies for low-carbon buildings. PhD thesis, University of Nottingham, UK.
Cummins, A; Graham, B; Thomas, K and Lucey, T (2016) The effectiveness of managing through trust the middle management layer of a construction company: Proposed ethnographic research. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Curran, M and Spillane, J P (2020) External stakeholder management and engagement on urban construction projects in Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(2), pp. 59-68. ISSN 17514304
Curtis, B (1994) Roles, responsibilities and risks in management contracts. PhD thesis, University of Southampton, UK.
Çıdık, M S (2019) Construction productivity and digitalisation: An it productivity paradox perspective. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Dabke, S; Salem, O; Genaidy, A and Daraiseh, N (2008) Job satisfaction of women in construction trades. Journal of Construction Engineering and Management, 134(3), pp. 205-216. ISSN 0733-9364
Dadashnejad, A A and Valmohammadi, C (2018) Investigating the effect of value stream mapping on operational losses: A case study. Journal of Engineering, Design and Technology, 16(3), pp. 478-500. ISSN 1726-0531
Daddow, T and Skitmore, M (2004) Value management in practice: An interview survey. Construction Economics and Building, 4(2), pp. 11-18. ISSN 2204-9029
Dadi, G B (2013) Applying cognitive principles to the delivery of engineering information by different mediums. PhD thesis, University of Kentucky, USA.
Dahanayake, B; Ramachandra, T and Thurairajah, N (2016) Assessment on rework costs probability of housing projects in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Dai, J (2006) A latent analysis and prototype system to manage jobsite factors impacting construction labor productivity. PhD thesis, University of Kentucky, USA.
Dai, J and Goodrum, P M (2011) Differences in perspectives regarding labor productivity between Spanish-and English-speaking craft workers. Journal of Construction Engineering and Management, 137(9), pp. 689-697. ISSN 0733-9364
Dai, J; Goodrum, P M and Maloney, W F (2007) Analysis of craft workers' and foremen's perceptions of the factors affecting construction labour productivity. Construction Management and Economics, 25(11), pp. 1139-1152. ISSN 01446193
Dai, J; Goodrum, P M and Maloney, W F (2009) Construction craft workers' perceptions of the factors affecting their productivity. Journal of Construction Engineering and Management, 135(3), pp. 217-226. ISSN 0733-9364
Dai, J; Goodrum, P M; Maloney, W F and Srinivasan, C (2009) Latent structures of the factors affecting construction labor productivity. Journal of Construction Engineering and Management, 135(5), pp. 397-406. ISSN 0733-9364
Dainty, A R J; Bagilhole, B M and Neale, R H (2000) Computer aided analysis of qualitative data in construction management research. Building Research & Information, 28(4), pp. 226-233. ISSN 0961-3218
Dainty, A R J; Briscoe, G H and Millett, S J (2001) Subcontractor perspectives on supply chain alliances. Construction Management and Economics, 19(8), pp. 841-848. ISSN 01446193
Damoah, I S (2015) An investigation into the causes and effects of project failure in government projects in developing countries: Ghana as a case study. PhD thesis, Liverpool John Moores University, UK.
Danel, T; Lafhaj, Z; Puppala, A; BuHamdan, S; Lienard, S and Richard, P (2024) Identifying tower crane activities with data: The case of the concrete pouring. Engineering, Construction and Architectural Management, 31(2), pp. 939-956. ISSN 0969-9988
Danforth, E M; Weidman, J E and Farnsworth, C B (2017) Strategies employed and lessons learned by commercial construction companies during economic recession and recovery. Journal of Construction Engineering and Management, 143(7): 04017027, ISSN 0733-9364
Dardouri, S; BuHamdan, S; Al Balkhy, W; Dakhli, Z; Danel, T and Lafhaj, Z (2023) RFID platform for construction materials management. International Journal of Construction Management, 23(14), pp. 2509-2519. ISSN 1562-3599
Das, D K and Emuze, F (2017) A dynamic model of contractor-induced delays in India. Journal of Construction in Developing Countries, 22(1), pp. 21-39. ISSN 1823-6499
Das, M; Cheng, J C P and Law, K H (2015) An ontology-based web service framework for construction supply chain collaboration and management. Engineering, Construction and Architectural Management, 22(5), pp. 551-572. ISSN 0969-9988
Datta, S D; Sobuz, M H R; Nafe Assafi, M; Sutan, N M; Islam, M N; Mannan, M B; Akid, A S M and Hasan, N M S (2025) Critical project management success factors analysis for the construction industry of Bangladesh. International Journal of Building Pathology and Adaptation, 43(3), pp. 482-511. ISSN 2398-4708
Dauber, V F (2003) Measuring and minimising waste in construction by applying lean thinking. PhD thesis, University of Dundee, UK.
Dauda, J A; Chavan, N N; Saka, A B; Ajayi, S O and Oyegoke, A S (2025) An appraisal of barriers to digitalisation of construction industry in developing countries: perspective from India. International Journal of Construction Management, 25(7), pp. 770-782. ISSN 1562-3599
Davies, A J (1995) Towards a method of measurement and cost control for civil engineering work in the petrochemical industry. PhD thesis, University of Northumbria at Newcastle, UK.
Davis, R and Watson, P (1999) The utilization of formulae in overhead and profit claims. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system. PhD thesis, University of Southern California, USA.
Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193
Dawood, N N (1996) A strategy for a computer-based materials management system for the building industry. Journal of Financial Management of Property and Construction, 1(2), pp. 17-28. ISSN 1366-4387
Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Dawood, N N; Hobbs, B and Fanning, A (1999) Standardization of brickwork construction: Process identification. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Dawood, N N; Hobbs, B and Fanning, A (2001) Standardization of brickwork construction: Identification and measurement of standard processes. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
De Ridder, H A J (1994) Design and construct of complex civil engineering systems: A new approach to organization and contracts. PhD thesis, Delft University of Technology, Netherlands.
De Silva, W. P. M.; Jayasena, S.; Thennakoon, P. and Perera, B. A. K. S. (2026) Circular economic strategies for maximising the end-of-life value of modular buildings: A Delphi study. Smart and Sustainable Built Environment, 15(3), pp. 1366-1390. ISSN 2046-6099
De Silva, N; Darmicka, R and Fernando, E (2014) Impact of foreign workforce on productivity in foreign-funded infrastructure projects. Journal of Financial Management of Property and Construction, 19(2), pp. 168-183. ISSN 1366-4387
De Venny, A S (1999) Recycling of demolished masonry rubble. PhD thesis, Edinburgh Napier University, UK.
De Wilde, P; Augenbroe, G and Van Der Voorden, M (2002) Managing the selection of energy saving features in building design. Engineering, Construction and Architectural Management, 9(3), pp. 192-208. ISSN 0969-9988
Dehghan, R (2012) A new model, algorithm and computer tool to optimize overlapping of design activities in construction projects. PhD thesis, University of Calgary, Canada.
Dehghan, R and Ruwnapura, J Y (2014) Model of trade-off between overlapping and rework of design activities. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364
Dejahang, F (2004) Determinants of productivity on construction sites. PhD thesis, London South Bank University, UK.
Delatte, G (2014) The effects of three dimensional modeling on labor productivity through enhancing visualization of craft workers in the industrial construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Dempsey, H; Curran, M and Spillane, J P (2020) Scaffolding safety in the UK and Ireland: A framework to improve health and safety neglect on small and medium-sized construction projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Deng, Zhong Ming (1995) Extended state space modelling and influence diagrams for construction processes and aids. PhD thesis, University of New South Wales, Australia.
Desai, A (2012) Formulating an FM strategy for climate change mitigation and adaptation of commercial built assets. PhD thesis, University of Greenwich, UK.
Deshpande, S D (1988) Some facility planning techniques for construction site layouts. PhD thesis, Indian Institute of Technology Delhi, India.
Dhal, M (2020) Labor stand: Face of precarious migrant construction workers in India. Journal of Construction Engineering and Management, 146(6): 04020048, ISSN 0733-9364
Dharia, N V (2015) Scaffolding sentiment: Money, labor, and love in India's real estate and construction industry. PhD thesis, Harvard University, USA.
Dharmapalan, V; O'Brien, W J; Morrice, D and Jung, M (2021) Assessment of visibility in industrial construction projects: A viewpoint from supply chain stakeholders. Construction Innovation, 21(4), pp. 782-799. ISSN 1471-4175
Dias Barkokebas, R; Al-Hussein, M and Li, X (2022) VR-MOCAP-enabled ergonomic risk assessment of workstation prototypes in offsite construction. Journal of Construction Engineering and Management, 148(8): 04022064, ISSN 0733-9364
Dithebe, K; Aigbavboa, C O; Thwala, W D and Oke, A E (2019) Analysis on the perceived occurrence of challenges delaying the delivery of water infrastructure assets in South Africa. Journal of Engineering, Design and Technology, 17(3), pp. 554-571. ISSN 1726-0531
Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599
Dlamini, S (2014) The relationship of the construction sector to economic growth: analysis of South African and UK construction sectors. PhD thesis, University of Reading, UK.
Do, S T; Nguyen, V T and Dang, C N (2022) Exploring the relationship between failure factors and stakeholder coordination performance in high-rise building projects: Empirical study in the finishing phase. Engineering, Construction and Architectural Management, 29(2), pp. 870-895. ISSN 0969-9988
Doan, D T (2019) Enhancing green star certification by improving bim uptake through system dynamics modelling. PhD thesis, Auckland University of Technology, New Zealand.
Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(8), pp. 841-854. ISSN 01446193
Domdouzis, K (2007) Applications of wireless sensor technologies in construction. PhD thesis, Loughborough University, UK.
Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects. PhD thesis, Stanford University, USA.
Dong, R G; Pan, C S and Wu, J Z (2025) Safety design, use, and research of mast climbing work platforms. Journal of Construction Engineering and Management, 151(12): 03125009, ISSN 0733-9364
Donohoe, S and Coggins, J (2011) Liquidated damages in construction contracts: Is there a schism between the Australian and English courts? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Donyavi, S (2013) Understanding the complexity of materials procurement and the role of technology for small and medium sized enterprises in the construction sector. PhD thesis, University of Reading, UK.
Donyavi, S and Flanagan, R (2009) The impact of effective material management on construction site performance for small and medium sized construction enterprises. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Donyavi, S and Flanagan, R (2011) Tracking and positioning technology and its applications for supply chain materials for small and medium enterprises (SMEs) on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Donyavi, S; Flanagan, R; Assadi-Langroudi, A and Parisi, L (2024) Understanding the complexity of materials procurement in construction projects to build a conceptual framework influencing supply chain management of msmes. International Journal of Construction Management, 24(2), pp. 177-186. ISSN 1562-3599
Doorsamy, W and Padayachee, K (2019) Conceptualising the knower for a new engineering technology curriculum. Journal of Engineering, Design and Technology, 17(4), pp. 808-818. ISSN 1726-0531
Drew, D S (1994) The effect of contract type and size on competitiveness in construction contract bidding. PhD thesis, University of Salford, UK.
Drew, D S and Skitmore, M (2006) Testing Vickery's revenue equivalence theory in construction auctions. Journal of Construction Engineering and Management, 132(4), pp. 425-428. ISSN 0733-9364
Driessen, M (2014) Asphalt encounters: Chinese road building in Ethiopia. PhD thesis, University of Oxford, UK.
Du, J; Shi, Y; Zou, Z and Zhao, D (2018) COVR: Cloud-based multiuser virtual reality headset system for project communication of remote users. Journal of Construction Engineering and Management, 144(2): 04017109, ISSN 0733-9364
Du, J; Xue, Y; Sugumaran, V; Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(4), pp. 1601-1635. ISSN 0969-9988
Duckworth, J; Hasan, A and Kamardeen, I (2024) Mental health challenges of manual and trade workers in the construction industry: A systematic review of causes, effects and interventions. Engineering, Construction and Architectural Management, 31(4), pp. 1497-1516. ISSN 0969-9988
Duff, A R; Robertson, I T; Phillips, R A and Cooper, M D (1994) Improving safety by the modification of behaviour. Construction Management and Economics, 12(1), pp. 67-78. ISSN 01446193
Dulaimi, M F and Shan, H G (2002) The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore. Construction Management and Economics, 20(7), pp. 601-610. ISSN 01446193
Dumbuya, B and Nirupama, N (2017) Disasters and long-term economic sustainability: A perspective on Sierra Leone. International Journal of Disaster Resilience in the Built Environment, 8(1), pp. 58-76. ISSN 1759-5916
Duncan, K; Philips, P and Prus, M (2006) Prevailing wage legislation and public school construction efficiency: A stochastic frontier approach. Construction Management and Economics, 24(6), pp. 625-634. ISSN 1466433X
Duncheva, T A (2019) Offsite timber systems multi-factor productivity index. PhD thesis, University of Strathclyde, UK.
Dunn, B (2004) The regionalization of international contracting and its implications for models of construction spending. Construction Management and Economics, 22(1), pp. 93-100. ISSN 01446193
Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects. PhD thesis, Nottingham Trent University, UK.
Durdyev, S and Mbachu, J (2011) On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures. Construction Economics and Building, 11(3), pp. 18-33. ISSN 2204-9029
Dursun, O and Stoy, C (2012) Determinants of construction duration for building projects in Germany. Engineering, Construction and Architectural Management, 19(4), pp. 444-468. ISSN 0969-9988
Dutra, Clezio Thadeu de Souza (2016) Sustainable public bidding for engineering works and services. PhD thesis, Universidade Federal Fluminense, Brazil.
Dyer, B; Goodrum, P M and Viele, K (2012) Effects of omitted variable bias on construction real output and its implications on productivity trends in the United States. Journal of Construction Engineering and Management, 138(4), pp. 558-566. ISSN 0733-9364
Dyer, B D (2010) Construction industry productivity: Examining the effects of omitted variable bias in the census construction price index models. PhD thesis, University of Kentucky, USA.
Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.
Eames, M; Dixon, T; May, T and Hunt, M (2013) City futures: Exploring urban retrofit and sustainable transitions. Building Research & Information, 41(5), pp. 504-516. ISSN 0961-3218
Eastman, C M and Sacks, R (2008) Relative productivity in the AEC industries in the United States for on-site and off-site activities. Journal of Construction Engineering and Management, 134(7), pp. 517-526. ISSN 0733-9364
Ebekozien, A; Aigbavboa, C and Aigbedion, M (2023) Construction industry post-COVID-19 recovery: Stakeholders perspective on achieving sustainable development goals. International Journal of Construction Management, 23(8), pp. 1376-1386. ISSN 1562-3599
Ebekozien, A; Aigbavboa, C; Samsurijan, M S; Radin Firdaus, R B; Ayo-Odifiri, S O and Amadi, G C (2024) Disasters recovery and rehabilitation in informal settlements: The role of fourth industrial revolution technologies. International Journal of Construction Management, 24(11), pp. 1155-1165. ISSN 1562-3599
Eberhardt, L C M; Birgisdóttir, H and Birkved, M (2019) Life cycle assessment of a Danish office building designed for disassembly. Building Research & Information, 47(6), pp. 666-680. ISSN 0961-3218
Echezona, O N (2011) Client perception of engineering and construction services management in present-day Iraq: An exploratory study and assessment. PhD thesis, Walden University, USA.
Edirisinghe, R and Jadhav, A (2017) Is the smart safety vest a brutal innovation? Evaluation of microclimate performance using a thermal manikin. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Edirisinghe, R; Stranieri, A and Blismas, N (2016) Information visualisation for the wicked problem of safe construction design. Architectural Engineering and Design Management, 12(4), pp. 296-310. ISSN 1745-2007
Edward Back, W and Bell, L C (1995) Quantifying process benefits of electronic data management technologies. Journal of Construction Engineering and Management, 121(4), pp. 415-421. ISSN 0733-9364
Edwards, D J and Holt, G D (2008) Protecting capital investment in plant and equipment: Case study observations of post-theft recovery. Journal of Financial Management of Property and Construction, 13(2), pp. 96-110. ISSN 1366-4387
Eiris, R (2020) iVisit: Using 360-degree interactive digital sites to practice problem-solving and collaboration within complex spatiotemporal contexts. PhD thesis, University of Florida, USA.
Eiris, R; Albeaino, G; Gheisari, M; Benda, W and Faris, R (2021) Indrone: A 2D-based drone flight behavior visualization platform for indoor building inspection. Smart and Sustainable Built Environment, 10(3), pp. 438-456. ISSN 2046-6099
Eisma, P and Volker, L (2014) Exploring the field of public construction clients by a graphical network analysis. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ejohwomu, O A (2007) Modelling the supply and demand for construction and building services skills in the Black Country. PhD thesis, University of Wolverhampton, UK.
Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2007) The UK construction industry: A review of black country skills demand. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2008) The impact of multiskilling on UK's construction manpower. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(1), pp. 25-30. ISSN 17514312
Ekambaram, P; Love, P E D; Kumaraswamy, M M and Ng, T S T (2014) Causal ascription of rework in building and civil engineering projects: A multivariate exploration. Engineering, Construction and Architectural Management, 21(1), pp. 111-126. ISSN 0969-9988
Ekanayake, B; Ahmadian Fard Fini, A; Wong, J K W and Smith, P (2024) A deep learning-based approach to facilitate the as-built state recognition of indoor construction works. Construction Innovation, 24(4), pp. 933-949. ISSN 1471-4175
Eksteen, B and Rosenberg, D (2002) The management of overhead costs in construction companies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
El Anwar, O H E D (2009) Multi-objective optimization for temporary housing arrangements after natural disasters. PhD thesis, University of Illinois at Urbana-Champaign, USA.
El Asmar, M (2012) Modeling and benchmarking performance for the integrated project delivery (IPD) system. PhD thesis, University of Wisconsin - Madison, USA.
El Asmar, M; Hanna, A S and Loh, W Y (2013) Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11): 4013012, ISSN 0733-9364
El Asmar, M; Hanna, A S and Loh, W Y (2016) Evaluating integrated project delivery using the project quarterback rating. Journal of Construction Engineering and Management, 142(1): 04015046, ISSN 0733-9364
El-Anwar, O and Chen, L (2013) Computing a displacement distance equivalent to optimize plans for postdisaster temporary housing projects. Journal of Construction Engineering and Management, 139(2), pp. 174-184. ISSN 0733-9364
El-Anwar, O; El-Rayes, K and Elnashai, A S (2010) Maximizing the sustainability of integrated housing recovery efforts. Journal of Construction Engineering and Management, 136(7), pp. 794-802. ISSN 0733-9364
El-Batal, R S (1995) Reasoning by abstraction for public works contracts using a blackboard architecture. PhD thesis, Polytechnic University, USA.
El-Rayes, K and Jun, D H (2009) Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), pp. 1172-1180. ISSN 0733-9364
Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2000) D-sub: Decision support system for subcontracting construction works. Journal of Construction Engineering and Management, 126(3), pp. 191-199. ISSN 0733-9364
Elder, John (2007) The history of the master builders association of NSW: The first hundred years. PhD thesis, University of Sydney, Australia.
Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364
Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.
Elsayah, O S (2016) A framework for improvement of contractor selection procedures on major construction project in Libya. PhD thesis, Edinburgh Napier University, UK.
Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.
Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects. PhD thesis, Heriot-Watt University, UK.
Eltigani, Hadi Mohammed Ahmed (1995) An investigation into the impact of quality management systems upon construction productivity at the site level. PhD thesis, University of Strathclyde, UK.
Elyamany, A H M (2010) Developing a rational approach for contractor selection based on history of construction quality and long-term performance. PhD thesis, North Dakota State University, USA.
Elzarka, H M and Bell, L C (1995) Object-oriented methodology for materials-management systems. Journal of Construction Engineering and Management, 121(4), pp. 438-445. ISSN 0733-9364
Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.
Emuze, F (2020) Factors causing fatigue and safety-related errors on construction sites in bloemfontein. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Emuze, F (2022) Examining exploitation and its influence on construction sites in South Africa. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Emuze, F; Linake, M and Seboka, L (2016) Construction work and the housekeeping challenge in Lesotho. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Emuze, F and Mollo, L (2019) Disrespecting people with working conditions in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(3), pp. 112-117. ISSN 17514304
Emuze, F and Smallwood, J J (2012) Bridging public works project performance gaps in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 111-118. ISSN 17514312
Emuze, F and Smallwood, J J (2014) Collaborative working in South African construction: Contractors' perspectives. Journal of Engineering, Design and Technology, 12(3), pp. 294-306.
Emuze, F A and Smallwood, J J (2011) Improving project delivery in South African construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Engelen, L; Chau, J; Young, S; Mackey, M; Jeyapalan, D and Bauman, A (2019) Is activity-based working impacting health, work performance and perceptions? A systematic review. Building Research & Information, 47(4), pp. 468-479. ISSN 0961-3218
English, J; Haupt, T C and Smallwood, J J (2006) Women, construction and health and safety (H&S): South African and Tanzanian perspectives. Journal of Engineering, Design and Technology, 4(1), pp. 18-28. ISSN 1726-0531
Enshassi, A; Choudhry, R M; Mayer, P E and Shoman, Y (2008) Safety performance of subcontractors in the palestinian construction industry. Journal of Construction in Developing Countries, 13(1), pp. 51-62. ISSN 1823-6499
Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.
Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. II: Predicting safety outcomes using generalized linear models. Journal of Construction Engineering and Management, 141(8): 04015022, ISSN 0733-9364
Espada, R; Apan, A and McDougall, K (2017) Vulnerability assessment of urban community and critical infrastructures for integrated flood risk management and climate adaptation strategies. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 375-411. ISSN 1759-5916
Espada, R J; Apan, A and McDougall, K (2015) Vulnerability assessment and interdependency analysis of critical infrastructures for climate adaptation and flood mitigation. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 313-346. ISSN 1759-5916
Essaghouri, L.; Xu, F.; Zhu, C.; Aletoum, E. and Li, X. (2026) Two decades of embodied carbon in MENA's construction sector: Regional insights and policy implications. Journal of Construction Engineering and Management, 152(10): 04026171, ISSN 0733-9364
Evans, M (2013) An investigation into occupants' satisfaction in UK sustainable social housing. PhD thesis, University of the West of England, Bristol, UK.
Evans, M; Farrell, P; Mashali, A and Zewein, W (2021) Critical success factors for adopting building information modelling (BIM) and lean construction practices on construction mega-projects: A Delphi survey. Journal of Engineering, Design and Technology, 19(2), pp. 537-556. ISSN 1726-0531
Everett, J G and Slocum, A H (1994) Automation and robotics opportunities: Construction versus manufacturing. Journal of Construction Engineering and Management, 120(2), pp. 443-452. ISSN 0733-9364
Fadnavis, Aishwarya Sunil (2026) An integrated coordination framework for construction procurement: Examining early supplier involvement through agent-based modeling. PhD thesis, University of Washington, USA.
Fahdah, I (2008) Distributed IT for integration and communication of engineering information for collaborative building design. PhD thesis, University of Nottingham, UK.
Fakilede, J (2020) Strategies utility business organizations use to deliver construction projects on-budget and on-schedule. PhD thesis, Walden University, USA.
Fan, R Y C; Ng, S T and Wong, J M W (2010) Reliability of the Box-Jenkins model for forecasting construction demand covering times of economic austerity. Construction Management and Economics, 28(3), pp. 241-254. ISSN 1466433X
Fang, Y; Cho, Y K; Zhang, S and Perez, E (2016) Case study of BIM and cloud-enabled real-time RFID indoor localization for construction management applications. Journal of Construction Engineering and Management, 142(7): 5016003, ISSN 0733-9364
Fapohunda, J A (2009) Operational framework for optimal utilisation of construction resources during the production process. PhD thesis, Sheffield Hallam University, UK.
Faris, H; Gaterell, M and Hutchinson, D (2024) Developing a collaborative framework for construction projects in emerging economies. Smart and Sustainable Built Environment, 13(1), pp. 199-216. ISSN 2046-6099
Farnsworth, C B; South, A J; Barrett-Rodriguez, T J; Wells, M B; Smith, J P and Bingham, E D (2025) Assessing the effects of hurricanes irma and maria on the commercial and civil construction industry in Puerto Rico. International Journal of Construction Education and Research, 21(4), pp. 461-481. ISSN 1557-8771
Farnsworth, C B; Beveridge, S; Miller, K R and Christofferson, J P (2015) Application, advantages, and methods associated with using BIM in commercial construction. International Journal of Construction Education and Research, 11(3), pp. 218-236. ISSN 1557-8771
Farrington, J J (1987) A methodology to identify and categorize costs of quality deviations in design and construction. PhD thesis, Clemson University, USA.
Farrokhshad, M; Chan, P W and Blackwell, P (2016) Opening up risk management through goffman's dramaturgical approach. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Federle, M O (1990) Substitutes for leadership in the environment of unionized construction carpenters. PhD thesis, University of Michigan, USA.
Federle, M O and Maloney, W F (1992) Substitutes for leadership and unionized construction carpenters. Journal of Construction Engineering and Management, 118(2), pp. 332-348. ISSN 0733-9364
Feng, K (2022) Infrastructure resilience and management under changing tropical cyclone risk. PhD thesis, Princeton University, USA.
Feng, P P-Y (2009) Causes and effects of rework on the delivery of healthcare facilities in California. PhD thesis, University of California, Berkeley, USA.
Feofilovs, M; Romagnoli, F; Gotangco, C K; Josol, J C; Jardeleza, J M P; Litam, J E; Campos, J I and Abenojar, K (2020) Assessing resilience against floods with a system dynamics approach: A comparative study of two models. International Journal of Disaster Resilience in the Built Environment, 11(5), pp. 615-629. ISSN 1759-5916
Fernandez-Solis, J L (2013) Building construction: A deterministic non-periodic flow-a case study of chaos theories in tracking production flow. Architectural Engineering and Design Management, 9(1), pp. 21-48. ISSN 1745-2007
Fernando, L. S.; Kulatunga, U.; Ranadewa, T. and Keraminiyage, K. P. (2026) Accelerating disaster recovery: An agile approach to enhancing community disaster resilience. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 181-202. ISSN 1759-5908
Fifield, L-J (2017) Monitoring UK hospital building type performance. PhD thesis, Loughborough University, UK.
Firmenich, J (2017) Customisable framework for project risk management. Construction Innovation, 17(1), pp. 68-89. ISSN 1471-4175
Fisher, D J; Schluter, L and Toleti, P K (2005) Project management education and training process for career development. Journal of Construction Engineering and Management, 131(8), pp. 903-910. ISSN 0733-9364
Fitzpatrick, T and Molloy, J (2014) The role of NGOs in building sustainable community resilience. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 292-304. ISSN 1759-5916
Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.
Flanagan, R and Norman, G (1985) Sealed bid auctions: An application to the building industry. Construction Management and Economics, 3(2), pp. 145-161. ISSN 01446193
Flanagan, R; Norman, G and Worrall, H (1995) Trade performance of the UK building materials and components industries. Engineering, Construction and Architectural Management, 2(2), pp. 141-162. ISSN 0969-9988
Fletcher, S L (2001) Developing disassembly strategies for buildings to reduce the lifetime environmental impacts by applying a systems approach. PhD thesis, University of Sheffield, UK.
Flores Salas, A (2016) Evaluation of the use of lightweight concrete panels for post disaster house reconstruction using Building Information Modelling. PhD thesis, University of Manchester, UK.
Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771
Fobiri, G; Musonda, I and Muleya, F (2025) Using reality capture technology for efficient cost valuation and work verification of construction projects. Construction Innovation, 25(7), pp. 50-75. ISSN 1471-4175
Fontana, C.; Tomassoni, V.; Giuffrè, M. and Moscatelli, M. (2026) Why should we bother about urban risk reduction? ERS instrument and a methodology to assess its impact on urban functionality. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 203-220. ISSN 1759-5908
Forcada, N; Gangolells, M; Casals, M and Macarulla, M (2017) Factors affecting rework costs in construction. Journal of Construction Engineering and Management, 143(8): 04017032, ISSN 0733-9364
Fordjour, G A; Chan, A P C and Tuffour-Kwarteng, L (2021) Exploring construction employees’ perspectives on the potential causes of psychological health conditions in the construction industry: A study in Ghana. International Journal of Construction Education and Research, 17(4), pp. 373-393. ISSN 1557-8771
Fore, S and Mbohwa, C (2015) Greening manufacturing practices in a continuous process industry: Case study of a cement manufacturing company. Journal of Engineering, Design and Technology, 13(1), pp. 94-122.
Forsythe, P (2011) Drivers of housing demolition decision making and the impact on timber waste management. Construction Economics and Building, 11(1), pp. 1-14. ISSN 2204-9029
Forsythe, P (2018) Extending and operationalizing construction productivity measurement on building projects. Construction Management and Economics, 36(12), pp. 683-699. ISSN 01446193
Foster, W R (2007) The impact of a bidder workshop on self-efficacy. EdD thesis, University of Cincinnati, USA.
Fox, S; Marsh, L and Cockerham, G (2002) How building design imperatives constrain construction productivity and quality. Engineering, Construction and Architectural Management, 9(5-6), pp. 378-387. ISSN 0969-9988
Francis, Matthew Charles (2020) Assessing impact of the built environment on academic research productivity. PhD thesis, RMIT University, Australia.
Francis, T R; Wilkinson, S; Mannakkara, S and Chang-Richards, A (2018) Post-disaster reconstruction in Christchurch: A "build back better" perspective. International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 239-248. ISSN 1759-5916
Francom, T C (2015) Performance of the construction manager at risk (CMAR) delivery method applied to pipeline construction projects. PhD thesis, Arizona State University, USA.
Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.
Franz, B W and Olopade, J (2024) Exploring pathways to project success through project delivery team integration: A qualitative comparative analysis. Construction Management and Economics, 42(6), pp. 564-581. ISSN 01446193
Fraser, C and Zhu, C (2008) Stakeholder perception of construction site managers' effectiveness. Construction Management and Economics, 26(6), pp. 579-590. ISSN 1466433X
Friedrich, D R; Daly, J P and Dick, W G (1987) Revisions, repairs, and rework on large projects. Journal of Construction Engineering and Management, 113(3), pp. 488-500. ISSN 0733-9364
Fulford, R G (2019) The implications of the construction industry to national wealth. Engineering, Construction and Architectural Management, 26(5), pp. 779-793. ISSN 0969-9988
Furusaka, S (1984) A model for the selection of the optimum crane for construction sites. Construction Management and Economics, 2(2), pp. 157-176. ISSN 01446193
Futcher, K (2001) Managing portfolios of projects. PhD thesis, Loughborough University, UK.
Gaisie, Eric (2021) Social capital and disaster resilience: A case of flooding in informal settlements in Accra, Ghana. PhD thesis, University of Melbourne, Australia.
Gamil, Y; Al-Sarafi, A H and Najeh, T (2023) Post COVID-19 pandemic possible business continuity strategies for construction industry revival a preliminary study in the Malaysian construction industry. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 640-654. ISSN 1759-5916
Ganah, A A M (2003) Computer visualisation support for buildability. PhD thesis, Loughborough University, UK.
Ganesan, S (1994) Employment maximization in construction in developing countries. Construction Management and Economics, 12(4), pp. 323-335. ISSN 01446193
Ganguly, K K; Padhy, R K and Rai, S S (2017) Managing the humanitarian supply chain: A fuzzy logic approach. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 521-536. ISSN 1759-5916
Gao, T; Ergan, S; Akinci, B and Garrett, J H (2014) Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. Journal of Construction Engineering and Management, 140(3): 4013054, ISSN 0733-9364
Garcia, C; Huebschman, R; Abraham, D M and Bullock, D M (2006) Using GPS to measure the impact of construction activities on rural interstates. Journal of Construction Engineering and Management, 132(5), pp. 508-515. ISSN 0733-9364
Garmston H, F M and Pan W, d W P (2013) Multi-storey building retrofit with a focus on the façade selection process: A UK commercial office case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Gasseloğlu, M A and Gonçalves, J E (2026) Reframing disaster recovery through spatial justice: An integrated framework. Buildings & Cities, 7(1), pp. 196-214. ISSN 2632-6655
George, M G (2003) The implementation of project management in the building construction field in the United Arab Emirates. PhD thesis, University of South Wales, UK.
Georgekutty, C K (2014) Optimization of construction cost in construction materials. Unpublished PhD thesis, Cochin University of Science and Technology, India.
Gerami Seresht, N and Fayek, A R (2018) Dynamic modeling of multifactor construction productivity for equipment-intensive activities. Journal of Construction Engineering and Management, 144(9): 04018091, ISSN 0733-9364
Ghadar, K O (2017) An examination of PERT implementation in the Libyan construction industry. PhD thesis, Cardiff Metropolitan University, UK.
Ghaeli, M R (1998) Pavement and bridge cost allocation analysis of the Intario intercity highway network. PhD thesis, University of Waterloo, USA.
Ghaffari, M (2017) The impact of multitasking on critical chain portfolios. PhD thesis, University of Manchester, UK.
Ghanbari, A (2006) Model-based integrated total project management systems, with an emphasis on materials management. PhD thesis, University of British Columbia, Canada.
Ghannad, P and Lee, Y C (2023) Optimizing modularization of residential housing designs for rapid postdisaster mass production of housing. Journal of Construction Engineering and Management, 149(7): 04023046, ISSN 0733-9364
Gharaibeh, L; Eriksson, K and Lantz, B (2025) Quantifying BIM investment value: A systematic review. Journal of Engineering, Design and Technology, 23(5), pp. 1384-1403. ISSN 1726-0531
Ghasemi Poor Sabet, Pejman (2020) A hybrid OSM–BIM framework for construction management system. PhD thesis, Curtin University, Australia.
Ghavidel, A (2025) AI-informed multi-threat decision-support methodology for long-term bridge asset management. PhD thesis, University of Texas at San Antonio, USA.
Ghodki, M K (2024) A new solar powered robotic arm guided master–slave electric motors of biomass conveyor. Journal of Engineering, Design and Technology, 22(3), pp. 739-762. ISSN 1726-0531
Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts. PhD thesis, Syracuse University, USA.
Ghosh, A (2015) Analyzing the impact of building information modeling (BIM) on labor productivity in retrofit construction: Case study at a semiconductor manufacturing facility. PhD thesis, Arizona State University, USA.
Ghosh, A; Parrish, K and Chasey, A D (2015) Implementing a vertically-integrated BIM curriculum in an undergraduate construction management program. International Journal of Construction Education and Research, 11(2), pp. 121-139. ISSN 1557-8771
Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: Client expectations and drivers. Building Research & Information, 31(2), pp. 146-160. ISSN 0961-3218
Gibson, G E (1990) Data integration and transfer methodologies in industrial construction. PhD thesis, Auburn University, USA.
Gidado, K I (1996) Project complexity: The focal point of construction production planning. Construction Management and Economics, 14(3), pp. 213-225. ISSN 01446193
Gidigah, B K; Agyekum, K and Baiden, B K (2022) Defining social value in the public procurement process for works. Engineering, Construction and Architectural Management, 29(6), pp. 2245-2267. ISSN 0969-9988
Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193
Gladovic, C (2026) Hard hats, soft skills: A responsive scaffold model for construction management education. Construction Economics and Building, 26(1), ISSN 2204-9029
Glavan, J R and Tucker, R L (1991) Forecasting design-related problems-case study. Journal of Construction Engineering and Management, 117(1), pp. 47-65. ISSN 0733-9364
Glavinich, T E (1990) Development of a model microcomputer-based project management system. DrEng thesis, University of Kansas, USA.
Gledson, B; Rogage, K; Luk, M; Tallet, E; Thompson, A; Landy, M and Wigget, D (2022) Addressing design management challenges through the development of a web-based platform. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Gledson, B J (2016) Hybrid project delivery processes observed in constructor BIM innovation adoption. Construction Innovation, 16(2), pp. 229-246. ISSN 1471-4175
Goh, B H (2016) Designing a whole-life building cost index in Singapore. Built Environment Project and Asset Management, 6(2), pp. 159-173. ISSN 2044-124X
Goh, Kai Chen (2011) Developing financial decision support for highway infrastructure sustainability. PhD thesis, Queensland University of Technology, Australia.
Gohardani, N (2014) An approach towards sustainable building. PhD thesis, KTH Royal Institute of Technology, Sweden.
Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175
Goldman, C M (2025) The built environment and employee well-being: An investigation into the attributes and impacts of supportive physical work environments in long-term care facilities. PhD thesis, University of Colorado at Denver, USA.
Goldwyn, B (2022) Drawing from local, multi-hazard safety perceptions and engineering assessments for safer housing. PhD thesis, University of Colorado at Boulder, USA.
Gomez Villanueva, Sulyn Cossett (2023) Behavior-based quality system (bbqs). PhD thesis, University of California, USA.
Gong, J; Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction. Construction Management and Economics, 29(7), pp. 737-751. ISSN 1466433X
Gonsalves, N; Akanmu, A; Gao, X; Agee, P and Shojaei, A (2023) Industry perception of the suitability of wearable robot for construction work. Journal of Construction Engineering and Management, 149(5): 04023017, ISSN 0733-9364
Gonsalves, N J; Yusuf, A; Ogunseiju, O and Akanmu, A (2024) Evaluation of concrete workers' interaction with a passive back-support exoskeleton. Engineering, Construction and Architectural Management, 31(11), pp. 4585-4601. ISSN 0969-9988
González, J; Figueiredo, K; Hammad, A W A; Tam, V W Y; Haddad, A N and Illankoon, C (2025) Heritage BIM (HBIM) applied in emergency scenarios: A case study of the National Museum in Brazil. International Journal of Construction Management, 25(11), pp. 1239-1253. ISSN 1562-3599
Goodrum, P M and Haas, C T (2002) Partial factor productivity and equipment technology change at activity level in U.S. Construction industry. Journal of Construction Engineering and Management, 128(6), pp. 463-472. ISSN 0733-9364
Goodrum, P M; Haas, C T; Caldas, C; Zhai, D; Yeiser, J and Homm, D (2011) Model to predict the impact of a technology on construction productivity. Journal of Construction Engineering and Management, 137(9), pp. 678-688. ISSN 0733-9364
Goodrum, P M; Haas, C T and Glover, R W (2002) The divergence in aggregate and activity estimates of US construction productivity. Construction Management and Economics, 20(5), pp. 415-423. ISSN 01446193
Goodrum, P M; Wan, Y and Fenouil, P C (2009) A decision-making system for accelerating roadway construction. Engineering, Construction and Architectural Management, 16(2), pp. 116-135. ISSN 0969-9988
Goodrum, P M; Zhai, D and Yasin, M F (2009) Relationship between changes in material technology and construction productivity. Journal of Construction Engineering and Management, 135(4), pp. 278-287. ISSN 0733-9364
Gorgolewski, M (2008) Designing with reused building components: Some challenges. Building Research & Information, 36(2), pp. 175-188. ISSN 0961-3218
Gorse, C A (2003) Conflict and conflict management in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Graham, D; Smith, S D and Tommelein, I D (2005) Cost of concrete placement for contractors. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Graham, D; Tommelein, I D and Smith, S D (2005) Cost reduction through vertical integration of the in-situ concrete supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Gravina da Rocha, C; Korb, S and Sacks, R (2022) Work structuring and product design for customized repetitive projects. Construction Management and Economics, 40(7-8), pp. 526-547. ISSN 01446193
Green, S D; Fernie, S and Weller, S (2005) Making sense of supply chain management: A comparative study of aerospace and construction. Construction Management and Economics, 23(6), pp. 579-593. ISSN 01446193
Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X
Greenwood, D; Hogg, K and Kan, S (2005) Subcontractors' liability for project delay. Journal of Financial Management of Property and Construction, 10(2), pp. 107-114. ISSN 1366-4387
Griffis, F H and Christodoulou, S (2000) Construction risk analysis tool for determining liquidated damages insurance premiums: Case study. Journal of Construction Engineering and Management, 126(6), pp. 407-413. ISSN 0733-9364
Gruneberg, S (2010) Does the Bon curve apply to infrastructure markets? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Gruneberg, S and Folwell, K (2013) The use of gross fixed capital formation as a measure of construction output. Construction Management and Economics, 31(4), pp. 359-368. ISSN 1466433X
Gruneberg, S and Hughes, W P (2005) UK construction orders and output: A comparison of government and commercially available data 1995-2001. Journal of Financial Management of Property and Construction, 10(2), pp. 83-94. ISSN 1366-4387
Gruneberg, S and Ive, G (2002) The relationship between the aggregate annual wage bills of heating and ventilation contractors, heating and ventilation industry output and construction industry output. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Gruneberg, Stephen Louis (2001) The growth and survival of firms in the heating and ventilating industry. PhD thesis, University College London, UK.
Guerra, Beatriz Chinelato (2021) BIM-based construction waste management and circular economy for resource recovery. PhD thesis, University of Texas at Austin, USA.
Gullette, G; Thebpanya, P and Singto, S (2022) Socioeconomic and livelihood impacts within Bangkok's expanding metropolitan region. Buildings & Cities, 3(1), pp. 808-823. ISSN 2632-6655
Guo, H; Zhang, Z; Yu, R; Sun, Y and Li, H (2023) Action recognition based on 3D skeleton and LSTM for the monitoring of construction workers' safety harness usage. Journal of Construction Engineering and Management, 149(4): 04023015, ISSN 0733-9364
Guo, S; Ding, L; Zhang, Y; Skibniewski, M J and Liang, K (2019) Hybrid recommendation approach for behavior modification in the Chinese construction industry. Journal of Construction Engineering and Management, 145(6): 04019035, ISSN 0733-9364
Guo, S; Tang, B; Liang, K; Zhou, X and Li, J (2021) Comparative analysis of the patterns of unsafe behaviors in accidents between building construction and urban railway construction. Journal of Construction Engineering and Management, 147(5): 04021027, ISSN 0733-9364
Gupta, M; Hasan, A; Jain, A K and Jha, K N (2018) Site amenities and workers' welfare factors affecting workforce productivity in Indian construction projects. Journal of Construction Engineering and Management, 144(11): 04018101, ISSN 0733-9364
Gurmu, A T (2019) Tools for measuring construction materials management practices and predicting labor productivity in multistory building projects. Journal of Construction Engineering and Management, 145(2): 4018139, ISSN 0733-9364
Gurmu, A T (2020) Construction materials management practices enhancing labour productivity in multi-storey building projects. International Journal of Construction Management, 20(1), pp. 77-86. ISSN 1562-3599
Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029
Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.
Gutierrez-Bucheli, L.; Muñoz, S.; Couper, R. and Maxwell, D. W. (2026) Mapping the landscape of productivity in construction research: An umbrella review of trends, gaps and future directions. Engineering, Construction and Architectural Management, 33(15), pp. 516-539. ISSN 0969-9988
Guven, H and Tanik, A (2020) Water-energy nexus: Sustainable water management and energy recovery from wastewater in eco-cities. Smart and Sustainable Built Environment, 9(1), pp. 54-70. ISSN 2046-6099
Gwak, H S; Son, S H; Park, Y J and Lee, D E (2016) Exact time-cost tradeoff analysis in concurrency-based scheduling. Journal of Construction Engineering and Management, 142(10): 04016054, ISSN 0733-9364
Görsch, Christopher (2024) Learning to see flow: A worker-centric exploration towards task planning and control in construction. DSc thesis, Aalto University, Finland.
Ha, D. K. (2026) An evaluation and comparison of critical factors contributing to falls-from-height hazards in Vietnamese building projects. Journal of Engineering, Design and Technology, 24(3), pp. 831-858. ISSN 1726-0531
Hadavi, A (1991) Improvement in construction productivity through goal setting in a unionized environment. PhD thesis, Northwestern University, USA.
Hailu, H and Tshehla, M (2025) A conceptual framework for enhancing subcontracting performance in the construction industry of developing countries. Journal of Construction Business and Management, 7(2), pp. 1-15.
Hairstans, R and Smith, R E (2018) Offsite hub (Scotland): Establishing a collaborative regional framework for knowledge exchange in the UK. Architectural Engineering and Design Management, 14(1-2), pp. 60-77. ISSN 1745-2007
Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.
Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175
Halim, M S A; Jaafar, M; Osman, O and Shariff Haniff, M (2012) Financial ratio analysis: An assessment of Malaysian contracting firms. Journal of Construction in Developing Countries, 17(S1), pp. 71-78. ISSN 1823-6499
Haller, M and Stehn, L (2011) Evaluation of efficiency in housing construction design. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Halliday, S; Beggs, C and Muneer, T (1999) Is solar air conditioning feasible? Building Research & Information, 27(3), pp. 149-164. ISSN 0961-3218
Ham, N; Moon, S; Kim, J H and Kim, J J (2018) Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project. Journal of Construction Engineering and Management, 144(6): 05018006, ISSN 0733-9364
Hampton, P; Chinyio, E A and Riva, S (2019) Framing stress and associated behaviours at work: An ethnography study in the United Kingdom. Engineering, Construction and Architectural Management, 26(11), pp. 2566-2580. ISSN 0969-9988
Han, F (2021) Measurement of resilience performance for infrastructure construction project delivery. PhD thesis, University of New Mexico, USA.
Han, F and Bogus, S M (2021) Resilience criteria for project delivery processes: An exploratory analysis for highway project development. Journal of Construction Engineering and Management, 147(11): 04021140, ISSN 0733-9364
Han, S (2013) Automated monitoring and systemic analysis of workers' safety behavior in construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Handa, V K and Barcia, R M (1986) Construction production planning. Journal of Construction Engineering and Management, 112(2), pp. 163-177. ISSN 0733-9364
Hanna, A S; Lotfallah, W; Aoun, D G and Asmar, M E (2014) Mathematical formulation of the project quarterback rating: New framework to assess construction project performance. Journal of Construction Engineering and Management, 140(8): 04014033, ISSN 0733-9364
Hardison, D C (2018) Hazard recognition in design: Evaluating the effects of design information on hazard recognition performance. PhD thesis, University of Colorado at Boulder, USA.
Harinarain, N; Caluza, S and Dondolo, S (2021) Bricklaying robots in the South African construction industry: The contractor's perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Harran, M and Theunissen, H W (2019) Navigating the engineering literacy divide: design report collaboration practice realities. Journal of Engineering, Design and Technology, 17(1), pp. 77-101. ISSN 1726-0531
Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.
Harris, R; Romer, J; Kelly, O and Johnson, S (2003) Design and construction of the downland gridshell. Building Research & Information, 31(6), pp. 427-454. ISSN 0961-3218
Harty, C (2005) Innovation in construction: A sociology of technology approach. Building Research & Information, 33(6), pp. 512-522. ISSN 0961-3218
Harty, C (2008) Implementing innovation in construction: Contexts, relative boundedness and actor-network theory. Construction Management and Economics, 26(10), pp. 1029-1041. ISSN 1466433X
Harvey, E; Waterson, P and Dainty, A (2015) Comparing safety intelligence in air traffic management and construction: A conceptual comparison. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Hasan, A; Elmualim, A; Rameezdeen, R; Baroudi, B and Marshall, A (2018) An exploratory study on the impact of mobile ICT on productivity in construction projects. Built Environment Project and Asset Management, 8(3), pp. 320-332. ISSN 2044-124X
Hasanzadeh, S and Esmaeili, B (2022) Influence of best value procurement on design-build projects: A grounded theory study. International Journal of Construction Education and Research, 18(3), pp. 270-292. ISSN 1557-8771
Hashim, R (2018) Green innovation adoption in the construction sector: the role of absorptive capacity and the effect of environmental requirements. PhD thesis, University of Edinburgh, UK.
Hassan, Z (1997) CONPLAN: Construction planning and buildability evaluation in an integrated and intelligent construction environment. PhD thesis, University of Salford, UK.
Hassanain, M A; Mathar, H and Aker, A (2016) Post-occupancy evaluation of a university student cafeteria. Architectural Engineering and Design Management, 12(1), pp. 67-77. ISSN 1745-2007
Hastak, M (1994) Decision support system for project cost control strategy and planning. PhD thesis, Purdue University, USA.
Hastak, M; Halpin, D W and Vanegas, J (1996) COMPASS: new paradigm for project cost control strategy and planning. Journal of Construction Engineering and Management, 122(3), pp. 254-264. ISSN 0733-9364
Hatipkarasulu, Y (2020) A conceptual approach to graphically compare construction schedules. Construction Innovation, 20(1), pp. 43-60. ISSN 1471-4175
Hatmoko, J U D (2008) The impact of supply chain management practice on construction project performance. PhD thesis, University of Newcastle upon Tyne, UK.
Hatmoko, J U D and Scott, S (2010) Simulating the impact of supply chain management practice on the performance of medium-sized building projects. Construction Management and Economics, 28(1), pp. 35-49. ISSN 1466433X
Hatush, Z A (1996) Contractor selection using the multiattribute utility theory. PhD thesis, University of Salford, UK.
Haugbølle, K; Larsen, J N and Nielsen, J (2019) Construction productivity revisited: Towards measuring performance of construction output. Engineering, Construction and Architectural Management, 26(5), pp. 794-813. ISSN 0969-9988
Hayes, J; McDermott, V and Lingard, H (2015) What is risk? Construction activity near hazardous infrastructure. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Hayford, J K T; Eccles, T and Fong, D (2023) Development of conceptual motivation framework to enhance construction labour productivity in the UK. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Hayles, C S (2010) An examination of decision making in post disaster housing reconstruction. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 103-122. ISSN 1759-5916
He, R (2023) Modeling of sustainable materials management systems: Hybrid science-based, data-driven approaches. PhD thesis, Carnegie Mellon University, USA.
Heesom, D; Boden, P; Hatfield, A; De Los Santos Melo, A and Czarska-Chukwurah, F (2021) Implementing a HBIM approach to manage the translocation of heritage buildings. Engineering, Construction and Architectural Management, 28(10), pp. 2948-2966. ISSN 0969-9988
Hegazy, T; Abdel-Monem, M and Saad, D A (2014) Framework for enhanced progress tracking and control of linear projects. Engineering, Construction and Architectural Management, 21(1), pp. 94-110. ISSN 0969-9988
Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364
Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364
Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364
Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364
Hejducki, Z (2004) Sequencing problems in methods of organising construction processes. Engineering, Construction and Architectural Management, 11(1), pp. 20-32. ISSN 0969-9988
Hejducki, Z and Mrozowicz, J (2001) Stream methods of construction work organization: An introduction to the problem. Engineering, Construction and Architectural Management, 8(2), pp. 80-89. ISSN 0969-9988
Helen, C L; Francis, V and Turner, M (2010) The rhythms of project life: A longitudinal analysis of work hours and work-life experiences in construction. Construction Management and Economics, 28(10), pp. 1085-1098. ISSN 1466433X
Henao, Y; Grubert, E; Korey, M; Bank, L C and Gentry, R (2024) Life cycle assessment and life cycle cost analysis of repurposing decommissioned wind turbine blades as high-voltage transmission poles. Journal of Construction Engineering and Management, 150(5): 05024004, ISSN 0733-9364
Hendy, A O A (2007) An approach to sustainable construction in post-disaster contexts: with specific reference to the Marmara region of Turkey. PhD thesis, Coventry University, UK.
Heravi Torbati, Amir Hossein (2014) Improving construction management: An investigation into the influences of effective stakeholder involvement on project quality outcomes. PhD thesis, Queensland University of Technology, Australia.
Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193
Herbsman, Z J and Glagola, C R (1998) Lane rental: innovative way to reduce road construction time. Journal of Construction Engineering and Management, 124(5), pp. 411-417. ISSN 0733-9364
Hermans, M; Veldhuis, H; Huizing, D and Rots, S (2019) The embedding of the construction client role in Dutch municipalities and its effects on professionalism and organisational learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Heshmati, K; Shahabpoor, E; Walker, I; Ghanbari, S and Darby, A (2025) The effect of wind-induced vibrations in tall buildings on occupants' work performance. Building Research & Information, 53(8), pp. 949-964. ISSN 0961-3218
Hesse, A D (1991) The management of risks in the procurement of very large construction projects (Britain and New Commonwealth): Comparative change in procurement methods for very large construction projects. PhD thesis, University College London, UK.
Hetherton, T and Charlson, J (2015) When statutes collide: Potential recovery of own party adjudication costs. International Journal of Law in the Built Environment, 7(3), pp. 214-230. ISSN 1756-1450
Hewage, K N (2007) Construction productivity improvement by worker motivation and it based communication. PhD thesis, University of Calgary, Canada.
Hewavitharana, S; Perera, A; Perera, S; Perera, P and Nanayakkara, S (2025) Framework for systematic adoption of ERP systems in the Sri Lankan construction industry. Built Environment Project and Asset Management, 15(3), pp. 629-646. ISSN 2044-124X
Hidayat, B and Egbu, C (2010) A literature review of the role of project management in post-disaster reconstruction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Hiete, M; Merz, M and Schultmann, F (2011) Scenario-based impact analysis of a power outage on healthcare facilities in Germany. International Journal of Disaster Resilience in the Built Environment, 2(3), pp. 222-244. ISSN 1759-5916
Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(2), pp. 139-151. ISSN 1557-8771
Hill, C (2010) The concerns of health, safety and welfare within the tri-partite relationship surrounding work placement for construction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Hilu, K A and Hiyassat, M A (2024) Qualitative assessment of resilience in construction projects. Construction Innovation, 24(5), pp. 1297-1319. ISSN 1471-4175
Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.
Hindmarch, H; Gale, A W and Harrison, R E (2010) A proposed construction design change management tool to aid in making informed design decisions. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Hinze, J and Gambatese, J (2003) Factors that influence safety performance of specialty contractors. Journal of Construction Engineering and Management, 129(2), pp. 159-164. ISSN 0733-9364
Hinze, J and Olbina, S (2009) Empirical analysis of the learning curve principle in prestressed concrete piles. Journal of Construction Engineering and Management, 135(5), pp. 425-431. ISSN 0733-9364
Hinze, J and Tracey, A (1994) The contractor-subcontractor relationship: The subcontractor's view. Journal of Construction Engineering and Management, 120(2), pp. 274-287. ISSN 0733-9364
Ho, P (2012) Comparison of the grey model and the box jenkins model in forecasting manpower in the UK construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ho, P H K (2013) Forecasting the manpower demand for quantity surveyors in Hong Kong. Construction Economics and Building, 13(3), pp. 1-12. ISSN 2204-9029
Ho Song, M and Fischer, M (2020) Empirical determination of the smallest batch sizes for daily planning. Journal of Construction Engineering and Management, 146(3): 04020011, ISSN 0733-9364
Hoare, D and Broome, J (2001) Bills of quantities versus activity schedules for civil engineering projects. Journal of Construction Procurement, 7(1), pp. 11-26. ISSN 1358-9180
Hoezen, M; Voordijk, H and Dewulf, G (2012) Contracting dynamics in the competitive dialogue procedure. Built Environment Project and Asset Management, 2(1), pp. 6-24. ISSN 2044-124X
Hoezen, Mieke (2012) The competitive dialogue procedure: Negotiations and commitment in inter-organisational construction projects. PhD thesis, University of Twente, Netherlands.
Hogarth, T and Gambin, L (2014) Employer investment in apprenticeships in England: An exploration of the sensitivity of employers in the construction sector to the net costs of training. Construction Management and Economics, 32(9), pp. 845-856. ISSN 01446193
Holt, G D and Edwards, D J (2013) Analysis of United Kingdom off-highway construction machinery market and its consumers using new-sales data. Journal of Construction Engineering and Management, 139(5), pp. 529-537. ISSN 0733-9364
Hon, C K H; Sun, C; Way, K A; Jimmieson, N L; Xia, B and Biggs, H C (2024) Psychosocial hazards affecting mental health in the construction industry: A qualitative study in Australia. Engineering, Construction and Architectural Management, 31(8), pp. 3165-3192. ISSN 0969-9988
Hong, Y; Xie, H; Bhumbra, G and Brilakis, I (2021) Comparing natural language processing methods to cluster construction schedules. Journal of Construction Engineering and Management, 147(10): 04021136, ISSN 0733-9364
Hong Loh, W and Ofori, G (2000) Effect of registration on performance of construction subcontractors in Singapore. Engineering, Construction and Architectural Management, 7(1), pp. 29-40. ISSN 0969-9988
Hoque, M I; Safayet, M A; Rana, M J; Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(2), pp. 401-421. ISSN 23984708
Horney, J; Simon, M C; Ricchetti-Masterson, K and Berke, P (2016) Resident perception of disaster recovery planning priorities. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 330-343. ISSN 1759-5916
Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364
Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364
Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193
Hua, G B (2008) The state of applications of quantitative analysis techniques to construction economics and management (1983 to 2006). Construction Management and Economics, 26(5), pp. 485-497. ISSN 1466433X
Hua, G B (2009) Construction and economic development of four most competitive economies in the world: A comparison. International Journal of Construction Education and Research, 5(4), pp. 261-275. ISSN 1557-8771
Huang, J (2025) Structure-aware 3D building reconstruction. PhD thesis, Delft University of Technology, Netherlands.
Huang, J; Han, D; Zhang, H and Cui, W (2024) Framework and case study for the assembly accuracy prediction of prefabricated buildings using BIM and tls. Architectural Engineering and Design Management, 20(6), pp. 1427-1453. ISSN 1745-2007
Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175
Huang, Y L (2008) The pricing of conditional performance guarantees with risky collateral. Construction Management and Economics, 26(9), pp. 967-978. ISSN 1466433X
Hughes, R and Thorpe, D (2014) A review of enabling factors in construction industry productivity in an Australian environment. Construction Innovation, 14(2), pp. 210-228. ISSN 1471-4175
Hughes, W P (2001) Evaluating plans of work. Engineering, Construction and Architectural Management, 8(4), pp. 272-283. ISSN 0969-9988
Hughes, W P (2003) A comparison of two editions of the RIBA plan of work. Engineering, Construction and Architectural Management, 10(5), pp. 302-311. ISSN 0969-9988
Hulathdoowage, N D; Karunasena, G; Udawatta, N and Liu, C (2024) Reviewing the contribution of retrofitting for climate resilience in residential buildings. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 324-340. ISSN 1759-5916
Hunt, B J P (1980) Development of a research program for scaffolding standards. DEng thesis, University of Kansas, USA.
Hussain, A.; Che Ibrahim, C. K. I.; Belayutham, S.; Manu, P. and Cheung, C. (2026) Exploring regulatory capabilities for design for safety in construction: The case of Malaysia. Built Environment Project and Asset Management, 16(2), pp. 221-241. ISSN 2044-124X
Hussain, M B (1993) Constraint-based construction project scheduling. PhD thesis, Carnegie Mellon University, USA.
Hwang, B G; Thomas, S R; Haas, C T and Caldas, C H (2009) Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), pp. 187-198. ISSN 0733-9364
Hwang, B G and Yang, S (2014) Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(2), pp. 190-205. ISSN 0969-9988
Hwang, B G; Zhao, X and Yang, K W (2019) Effect of BIM on rework in construction projects in Singapore: Status quo, magnitude, impact, and strategies. Journal of Construction Engineering and Management, 145(2): 04018125, ISSN 0733-9364
Hwang, S (2011) Time series models for forecasting construction costs using time series indexes. Journal of Construction Engineering and Management, 137(9), pp. 656-662. ISSN 0733-9364
Hwang, S; Jebelli, H; Choi, B; Choi, M and Lee, S (2018) Measuring workers' emotional state during construction tasks using wearable EEG. Journal of Construction Engineering and Management, 144(7): 04018050, ISSN 0733-9364
Hwang, S; Park, M; Lee, H S and Lee, S (2016) Hybrid simulation framework for immediate facility restoration planning after a catastrophic disaster. Journal of Construction Engineering and Management, 142(8): 4016026, ISSN 0733-9364
Hwang, S; Park, M; Lee, H S; Lee, S and Kim, H (2015) Postdisaster interdependent built environment recovery efforts and the effects of governmental plans: Case analysis using system dynamics. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hwang, Y; Kim, T; Ryu, J and Yang, K (2025) Collaborative bricklaying with a robotic arm using a head-mounted camera in construction. Journal of Construction Engineering and Management, 151(12): 04025204, ISSN 0733-9364
Hyari, K H; El-Mashaleh, M S and Rababeh, S M (2015) Framework for managing the traffic impacts of building construction projects. Journal of Construction in Developing Countries, 20(2), pp. 97-113. ISSN 1823-6499
Hübner, F; Volk, R; Kühlen, A and Schultmann, F (2017) Review of project planning methods for deconstruction projects of buildings. Built Environment Project and Asset Management, 7(2), pp. 212-226. ISSN 2044-124X
Ibbs, W and Nguyen, L D (2007) Alternative for quantifying field-overhead damages. Journal of Construction Engineering and Management, 133(10), pp. 736-742. ISSN 0733-9364
Ibe, C. N. (2026) Optimising sustainable deconstruction strategies for concrete structures: A multi-criteria decision-making framework approach. International Journal of Building Pathology and Adaptation, 44(3), pp. 773-788. ISSN 2398-4708
Ibironke, O T; Ekundayo, D and Awodele, O A (2011) A survey on the use and impact of information technology in quantity surveying service delivery in Nigeria. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ibironke, O T; Oladinrin, T O; Adeniyi, O and Eboreime, I V (2013) Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria. Journal of Construction in Developing Countries, 18(1), pp. 53-72. ISSN 1823-6499
Ibrahim, A; Nnaji, C; Namian, M and Shakouri, M (2024) Evaluating the impact of hazard information on fieldworkers' safety risk perception. Journal of Construction Engineering and Management, 150(3): 04023174, ISSN 0733-9364
Ibrahim, Abdullahi Alabi (2024) Construction workers' situational awareness: Investigating the role of physical fatigue, workplace dynamism, and emerging technologies. PhD thesis, Texas A&M University, USA.
Ibrahim, M W; Hanna, A S; Russell, J S; Abotaleb, I S and El-Adaway, I H (2020) Quantitative analysis of the impacts of out-of-sequence work on project performance. Journal of Construction Engineering and Management, 146(8): 04020090, ISSN 0733-9364
Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry. PhD thesis, Nottingham Trent University, UK.
Idoro, G I (2009) Clients' perception of construction project leaders in the Nigerian banking industry. Journal of Engineering, Design and Technology, 7(3), pp. 264-281. ISSN 1726-0531
Igwe, C; Nasiri, F and Hammad, A (2022) An empirical study on non-physical waste factors in the construction industry. Engineering, Construction and Architectural Management, 29(10), pp. 4088-4106. ISSN 0969-9988
Ikuabe, M; Aigbavboa, C and Kissi, E (2023) Potential applications and benefits of humanoids in the construction industry: A south African perspective. International Journal of Building Pathology and Adaptation, 41(6), pp. 254-268. ISSN 23984708
Ikuabe, M; Oke, A E and Aigbavboa, C (2020) Impact of contractors' opportunism on construction project transaction costs: Construction professionals' perception. Journal of Financial Management of Property and Construction, 25(1), pp. 125-141. ISSN 1366-4387
Ilozor, B B (2008) Architectural and building features disparity and preservation of structural and fabrics integrity. Journal of Engineering, Design and Technology, 6(1), pp. 33-47. ISSN 1726-0531
Ingemansson Havenvid, M; Hulthen, K; Linne, A and Sundquist, V (2015) New ways of organising construction due to user demands. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ingle, P V and Mahesh, G (2022) Construction project performance areas for Indian construction projects. International Journal of Construction Management, 22(8), pp. 1443-1454. ISSN 1562-3599
Inzulza Contardo, J; Boano, C and Wirsching, C (2018) Gentrification in (re)construction: Talca's neighbourhoods post 2010 earthquake. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 170-183. ISSN 1759-5916
Ioannou, P. G. and Liu, L. Y. (1993) Advanced construction technology system: Acts. Journal of Construction Engineering and Management, 119(2), pp. 288-306. ISSN 0733-9364
Ioannou, P G and Liu, L Y (1993) Advanced construction technology system: acts. Journal of Construction Engineering and Management, 119(2), pp. 288-306. ISSN 0733-9364
Ip, K; Miller, A and Ellis, J (2003) Criteria and measurement of indoor air quality in sustainable buildings. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Ip, K; Miller, A and Shum, F (2003) Evaluation of indoor air quality and energy use in air conditioned office buildings. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Irajifar, L; Sipe, N and Alizadeh, T (2016) The impact of urban form on disaster resiliency: A case study of Brisbane and Ipswich, Australia. International Journal of Disaster Resilience in the Built Environment, 7(3), pp. 259-275. ISSN 1759-5916
Irfan, M; Khalid, R A; Kaka Khel, S S U H; Maqsoom, A and Sherani, I K (2023) Impact of work–life balance with the role of organizational support and job burnout on project performance. Engineering, Construction and Architectural Management, 30(1), pp. 154-171. ISSN 0969-9988
Irizarry, J (2005) Safety issues in steel erection: Impact on task durations and risk perception of ironworkers. PhD thesis, Purdue University, USA.
Irizarry, J and Abraham, D M (2006) Assessment of risk perception of ironworkers. Journal of Construction Research, 7(1), pp. 111-132. ISSN 1609-9451
Irumba, R (2015) Modelling of construction safety performance and housing markets in Kampala, Uganda. PhD thesis, KTH Royal Institute of Technology, Sweden.
Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.
Isiadianso, C (2007) Integrating deconstruction into the project delivery process. PhD thesis, Loughborough University, UK.
Isiadinso, C; Anumba, C J; El-Rimawi, J and Bhamra, T (2006) Design for deconstruction lessons from the manufacturing industry. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Iskandar, K A; Hanna, A S and Lotfallah, W (2019) Modeling the performance of healthcare construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 2023-2039. ISSN 0969-9988
Islam, M Z (2018) Resourcing for post-disaster housing reconstruction: the case of Cyclones Sidr and Aila in Bangladesh. PhD thesis, London South Bank University, UK.
Jaafari, A (1997) Concurrent construction and life cycle project management. Journal of Construction Engineering and Management, 123(4), pp. 427-436. ISSN 0733-9364
Jaafari, A; Manivong, K K and Chaaya, M (2001) Vircon: Interactive system for teaching construction management. Journal of Construction Engineering and Management, 127(1), pp. 66-75. ISSN 0733-9364
Jackson, P (1987) The anatomy of constructional failures. PhD thesis, Heriot-Watt University, UK.
Jacobsen, E L; Solberg, A; Golovina, O and Teizer, J (2022) Active personalized construction safety training using run-time data collection in physical and virtual reality work environments. Construction Innovation, 22(3), pp. 531-553. ISSN 1471-4175
Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.
Jagafa, K (2016) A framework for construction business recovery in small and medium sized privately owned companies. PhD thesis, University of Salford, UK.
Jaggar, D and Ross, A (2003) A survey into the effectiveness of web-based teaching of building design cost management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Jahan, Israt (2024) Life-cycle sustainability analysis of construction and demolition wood waste to achieve circular economy. PhD thesis, RMIT University, Australia.
Jahanger, Q K; Trejo, D and Louis, J (2025) Evaluation of field labor and management productivity in the USA construction industry. Engineering, Construction and Architectural Management, 32(1), pp. 259-281. ISSN 0969-9988
Jalloul, Hiba (2024) Leveraging emergence for enhanced planning and decision-making in the built environment: Applications in resilience and sustainability planning. PhD thesis, Florida State University, USA.
Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.
Janné, M (2020) Construction logistics in a city development setting. PhD thesis, Linköping University, Sweden.
Jansma, G L (1987) A methodology for making construction productivity comparisons. PhD thesis, University of Texas at Austin, USA.
Jarkas, A M (2005) An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction. PhD thesis, University of Dundee, UK.
Jarkas, A M (2012) Buildability factors influencing concreting labor productivity. Journal of Construction Engineering and Management, 138(1), pp. 89-97. ISSN 0733-9364
Jarkas, A M (2012) Factors influencing power-trowelling productivity of concrete surface floors. Journal of Engineering, Design and Technology, 10(1), pp. 34-51. ISSN 1726-0531
Jarkas, A M (2015) Factors influencing labour productivity in Bahrain's construction industry. International Journal of Construction Management, 15(1), pp. 94-108. ISSN 1562-3599
Jarkas, A M; Al Balushi, R A and Raveendranath, P K (2015) Determinants of construction labour productivity in Oman. International Journal of Construction Management, 15(4), pp. 332-344. ISSN 1562-3599
Javanmardi, A (2019) Strategies and predictive models for reducing workflow variability in construction production systems. PhD thesis, North Carolina State University, USA.
Javed, A A; Pan, W; Chen, L and Zhan, W (2018) A systemic exploration of drivers for and constraints on construction productivity enhancement. Built Environment Project and Asset Management, 8(3), pp. 239-252. ISSN 2044-124X
Jayakody, C; Malalgoda, C I; Amaratunga, D; Haigh, R; Liyanage, C; Hamza, M; Witt, E and Fernando, N (2022) Addressing housing needs of the displaced people promoting resilient and sustainable communities. International Journal of Disaster Resilience in the Built Environment, 13(3), pp. 368-385. ISSN 1759-5916
Jayasena, N S; Chan, D W M; Kumaraswamy, M M and Saka, A B (2023) Applicability of public-private partnerships in smart infrastructure development: The case of Hong Kong. International Journal of Construction Management, 23(11), pp. 1932-1944. ISSN 1562-3599
Jayasinghe, R S; Rameezdeen, R and Chileshe, N (2023) Modelling the cause and effect relationship risks in reverse logistics supply chains for demolition waste. Engineering, Construction and Architectural Management, 30(9), pp. 4018-4044. ISSN 0969-9988
Jayawardana, Jayawardanage Janappriya (2024) Investigating the sustainability of modern construction practices focusing on prefabricated construction. PhD thesis, RMIT University, Australia.
Jayawardane, A K W and Gunawardena, N B (1998) Construction workers in developing countries: A case study of Sri Lanka. Construction Management and Economics, 16(5), pp. 521-530. ISSN 01446193
Jeong, J and Jeong, J (2024) Sustainability in prefabricated construction: Enhancing multicriteria analysis and prediction using machine learning. Journal of Construction Engineering and Management, 150(8): 04024081, ISSN 0733-9364
Jeong, J G; Hastak, M and Syal, M (2009) Framework of manufacturer-retailer relationship in the manufactured housing construction. Construction Innovation, 9(1), pp. 22-41. ISSN 1471-4175
Jeong, J S; Ramírez-Gómez, Á and González-Gómez, D (2017) A web-based scaffolding-learning tool for design students' sustainable spatial planning. Architectural Engineering and Design Management, 13(4), pp. 262-277. ISSN 1745-2007
Jeong, K S; Kagioglou, M; Haigh, R; Amaratunga, D and Siriwardena, M L (2006) Embedding good practice sharing within process improvement. Engineering, Construction and Architectural Management, 13(1), pp. 62-81. ISSN 0969-9988
Jergeas, G F and Hartman, F T (1994) Contractors' construction-claims avoidance. Journal of Construction Engineering and Management, 120(3), pp. 553-560. ISSN 0733-9364
Ji, W and Abourizk, S M (2018) Data-driven simulation model for quality-induced rework cost estimation and control using absorbing Markov chains. Journal of Construction Engineering and Management, 144(8): 04018078, ISSN 0733-9364
Ji, Wenying (2018) Simulation-based analytics for fabrication quality-associated decision support. PhD thesis, University of Alberta, Canada.
Jia, B; Yang, Y; Xie, B and Yu, X (2021) Novel geometric control technology for precast segmental bridges. Journal of Construction Engineering and Management, 147(4): 04021006, ISSN 0733-9364
Jia, J; Ma, G; Jiang, S; Wu, M and Wu, Z (2021) Influence of social media use at work on construction managers' work performance: The knowledge seeker's perspective. Engineering, Construction and Architectural Management, 28(10), pp. 3216-3235. ISSN 0969-9988
Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364
Jijingi, A T (2019) A BIM-enabled procurement framework in new buildings for the Nigerian architecture, engineering and construction industry. PhD thesis, University of Portsmouth, UK.
Jin, Z and Gambatese, J (2020) Exploring the potential of technological innovations for temporary structures: A survey study. Journal of Construction Engineering and Management, 146(6): 04020049, ISSN 0733-9364
Johari, S and Jha, K N (2019) Determinants of workmanship: Defining quality in construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.
Jonsson, H and Rudberg, M (2017) KPIs for measuring performance of production systems for residential building: A production strategy perspective. Construction Innovation, 17(3), pp. 381-403. ISSN 1471-4175
Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.
Joo, M.; Im, J. B.; Lee, K. T. and Kim, J. H. (2026) Comparative analysis of work performance and physiological response based on office types and indoor space design. Architectural Engineering and Design Management, 22(2), pp. 365-381. ISSN 1745-2007
Jordan, E (2012) Pathways to community recovery: A qualitative comparative analysis of post-disaster outcomes. PhD thesis, University of Colorado at Boulder, USA.
Jordan, E; Javernick-Will, A and Amadei, B (2014) A qualitative comparative analysis of neighborhood recovery following Hurricane Katrina. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 391-412. ISSN 1759-5916
Joubert, F; Steyn, E and Pretorius, L (2021) Using the HAZOP method to conduct a risk assessment on the dismantling of large industrial machines and associated structures: Case study. Journal of Construction Engineering and Management, 147(1): 05020021, ISSN 0733-9364
Juliana, A; Oladimeji, O; Abiodun, A O; Haddad, A N and Tam, V W Y (2024) Influence of rework on construction project performance in Nigeria. International Journal of Construction Management, 24(8), pp. 888-893. ISSN 1562-3599
Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Junjia, Y; Ales@Alias, A H; Haron, N A and Abu Bakar, N (2025) Developing a method for evaluating the value of hoisting risk response strategies: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 32(9), pp. 6115-6136. ISSN 0969-9988
Junussova, T. and Nadeem, A. (2026) Modelling sustainable construction material management implementation strategy indicators in developed economies. International Journal of Construction Management, 26(9), pp. 1925-1943. ISSN 1562-3599
Järvelä, H; Lehto, A; Pirilä, T and Kuittinen, M (2025) Metrics for building component disassembly potential: A practical framework. Buildings & Cities, 6(1), pp. 634-653. ISSN 2632-6655
Kabundu, E K (2020) A housing affordability and tenure of choice quantum deliverable model in South Africa. PhD thesis, Nelson Mandela Metropolitan University, South Africa.
Kadir, M R b A (1996) Conceptual phase best practices. PhD thesis, Loughborough University, UK.
Kaewsri, N and Tongthong, T (2014) Favorable female attributes in relation to career challenges of women engineers in the Thai construction industry. International Journal of Construction Education and Research, 10(3), pp. 222-236. ISSN 1557-8771
Kagan, H A; Leary, D J and Pratter, G E K (1986) Design engineers' responsibilities during construction. Journal of Construction Engineering and Management, 112(3), pp. 394-402. ISSN 0733-9364
Kaka, A P F (1990) Corporate financial model for construction contractors. PhD thesis, Loughborough University, UK.
Kakar, A S; Hasan, A; Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1570-1590. ISSN 1726-0531
Kakitahi, J M (2014) Causality, magnitude and impact mitigation of rework in Uganda. PhD thesis, Lund University, Sweden.
Kakitahi, J M; Alinaitwe, H M; Landin, A and Mone, S J (2016) Impact of construction-related rework on selected Ugandan public projects. Journal of Engineering, Design and Technology, 14(2), pp. 238-251.
Kakitahi, J M; Landin, A and Alinaitwe, H M (2013) An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266-280. ISSN 1471-4175
Kalil, A J (2002) Use of a work sampling method (TVEA) to characterize determinants of particulate exposure in heavy and highway construction. DSc thesis, University of Massachusetts Lowell, USA.
Kam, C W (2000) Quality assurance of construction works in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Kamal, A; Abas, M; Khan, D and Azfar, R W (2022) Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. International Journal of Construction Management, 22(6), pp. 1141-1157. ISSN 1562-3599
Kamal, E M (2011) Absorptive capacity and implementation of new technology in Malaysian small and medium sized construction companies. PhD thesis, University of Reading, UK.
Kamal, E M and Flanagan, R (2012) Understanding absorptive capacity in Malaysian small and medium sized (SME) construction companies. Journal of Engineering, Design and Technology, 10(2), pp. 180-198. ISSN 1726-0531
Kamal, E M and Flanagan, R (2014) Key characteristics of rural construction SMEs. Journal of Construction in Developing Countries, 19(2), pp. 1-13. ISSN 1823-6499
Kamali, S (2025) Conceptual framework to evaluate and enhance resilience of public-private partnership projects. PhD thesis, Middle East Technical University, Turkey.
Kamani-Fard, A; Ahmad, M H and Ossen, D R (2012) The sense of place in the new homes of post-Bam earthquake reconstruction. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 220-236. ISSN 1759-5916
Kaming, P F (1996) A productivity audit system for construction management in Indonesia. PhD thesis, University of Wolverhampton, UK.
Kaming, P F; Olomolaiye, P O; Holt, G D; Kometa, S T and Harris, F C (1996) Project managers' perception of production problems: an Indonesian case study. Building Research & Information, 24(5), pp. 302-310. ISSN 0961-3218
Kaminsky, J and Faust, K (2018) Infrastructure epistemologies: Water, wastewater and displaced persons in Germany. Construction Management and Economics, 36(9), pp. 521-534. ISSN 01446193
Kang, Y; O'Brien, W J; Dai, J; Mulva, S P; Thomas, S P; Chapman, R E and Butry, D (2013) Interaction effects of information technologies and best practices on construction project performance. Journal of Construction Engineering and Management, 139(4), pp. 361-371. ISSN 0733-9364
Kangari, R (1982) Construction project selection under risk: Market model approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kangari, R and Yoshida, T (1989) Prototype robotics in construction industry. Journal of Construction Engineering and Management, 115(2), pp. 284-301. ISSN 0733-9364
Kannimuthu, M; Raphael, B; Ekambaram, P and Kuppuswamy, A (2020) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(4), pp. 893-916. ISSN 0969-9988
Kaplan, Z. and Abrishami, S. (2026) Integrating HBIM and big data analytics for disaster risk management in cultural heritage conservation. Smart and Sustainable Built Environment, 15(5), pp. 2038-2064. ISSN 2046-6099
Karim, K; Marosszeky, M and Davis, S (2006) Managing subcontractor supply chain for quality in construction. Engineering, Construction and Architectural Management, 13(1), pp. 27-42. ISSN 0969-9988
Karimidorabati, S; Haas, C T and Gray, J (2016) Evaluation of automation levels for construction change management. Engineering, Construction and Architectural Management, 23(5), pp. 554-570. ISSN 0969-9988
Karrbom Gustavsson, T (2016) Liminality roles in construction project practice: Opportunities and challenges. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Kartarn, S; Ballard, G and Ibbs, C W (1997) Introducing a new concept and approach to modeling construction. Journal of Construction Engineering and Management, 123(1), pp. 89-97. ISSN 0733-9364
Karunasena, G and Amaratunga, D (2015) Capacity gaps in post disaster construction and demolition waste management. Engineering, Construction and Architectural Management, 22(4), pp. 446-466. ISSN 0969-9988
Karunasena, G and Rameezdeen, R (2010) Post-disaster housing reconstruction: Comparative study of donor vs owner-driven approaches. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 173-191. ISSN 1759-5916
Karunasena, G I (2012) Capacity building for post disaster waste management: Construction and demolition waste. PhD thesis, University of Salford, UK.
Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175
Kashem, S B (2019) Housing practices and livelihood challenges in the hazard-prone contested spaces of rural Bangladesh. International Journal of Disaster Resilience in the Built Environment, 10(5), pp. 420-434. ISSN 1759-5916
Kasim, N B (2008) Improving materials management on construction projects. PhD thesis, Loughborough University, UK.
Kasim, N B; Anumba, C J and Dainty, A R J (2005) Improving materials management practices on fast-track construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Katsimpalis, E; Adey, B T and Haas, C T (2026) Automatically transforming virtual realitysimulations into project schedules. Journal of Construction Engineering and Management, 152(6): 04026059, ISSN 0733-9364
Kavishe, N; Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects: The case of Tanzania. Engineering, Construction and Architectural Management, 25(2), pp. 202-240. ISSN 0969-9988
Kazar, G and Comu, S (2022) Exploring the relations between the physiological factors and the likelihood of accidents on construction sites. Engineering, Construction and Architectural Management, 29(1), pp. 456-475. ISSN 0969-9988
Kazaz, A and Birgonul, M T (2005) Determination of quality level in mass housing projects in Turkey. Journal of Construction Engineering and Management, 131(2), pp. 195-202. ISSN 0733-9364
Keenan, M and Rostami, A (2021) The impact of quality management systems on construction performance in the North West of England. International Journal of Construction Management, 21(9), pp. 871-883. ISSN 1562-3599
Kehinde, J O and Aiyetan, O A (2002) A study of the nature of contractual claims in building contracts in Nigeria. Journal of Financial Management of Property and Construction, 7(3), pp. 197-202. ISSN 1366-4387
Kelly, J; Male, S and Gronqvist, M (2000) Characteristics of refurbishing retailers as clients of the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Kestle, L and Potangaroa, R (2012) Identifying the added-value of various roles in the post-disaster response and recovery of christchurch. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Khalife, Salam (2023) Developing advanced approaches to deliver value on construction projects: Integrating social dynamics, digital modelling techniques, and lean concepts. PhD thesis, University of Alberta, Canada.
Khan, M; Khalid, R; Anjum, S; Tran, S V T and Park, C (2022) Fall prevention from scaffolding using computer vision and IoT-based monitoring. Journal of Construction Engineering and Management, 148(7): 04022051, ISSN 0733-9364
Khanh, H. D.; Tiep, N. V. and Nguyen, K. V. (2026) EFA models for evaluating stakeholder perceptions of falls-from-height risks in building projects: A case study from Vietnam. Journal of Engineering, Design and Technology, 24(6), pp. 1483-1509. ISSN 1726-0531
Khanh, H D; Kim, S Y; Khoa, N V and Tu, N T (2023) The relationship between workers' experience and productivity: A case study of brick masonry construction. International Journal of Construction Management, 23(4), pp. 596-605. ISSN 1562-3599
Khanh, H D; Kim, S Y and Linh, L Q (2023) Construction productivity prediction through Bayesian networks for building projects: Case from Vietnam. Engineering, Construction and Architectural Management, 30(5), pp. 2075-2100. ISSN 0969-9988
Kheel, M (2024) The impact of risk and uncertainty on healthcare project delivery and its effect on intra-group conflict in the context of Saudi Arabia. PhD thesis, University of Manchester, UK.
Khosrowshahi, F (1997) Construction activity in the UK recent trends and projections. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Kifokeris, D and Löwstedt, M (2021) Lost and found in translation: Top-down decoupling and bottom-up recoupling of strategies and practices in construction production. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Kikwasi, G and Mbuya, E (2019) Vulnerability analysis of building structures to floods: The case of flooding informal settlements in Dar es Salaam, Tanzania. International Journal of Building Pathology and Adaptation, 37(5), pp. 629-656. ISSN 23984708
Killingsworth, J; Mehany, M H and Ladhari, H (2021) General contractors’ experience using off-site structural framing systems. Construction Innovation, 21(1), pp. 40-63. ISSN 1471-4175
Kim, H and Kakimoto, R (2016) An international comparative analysis of local hazard mitigation plan evaluation for flood: The USA, Japan and Korea. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 406-419. ISSN 1759-5916
Kim, H; Lee, H S; Park, M; Ahn, C R and Hwang, S (2015) Productivity forecasting of newly added workers based on time-series analysis and site learning. Journal of Construction Engineering and Management, 141(9): 5015008, ISSN 0733-9364
Kim, I (2007) Development and implementation of an engineering productivity measurement system (EPMS) for benchmarking. PhD thesis, University of Texas at Austin, USA.
Kim, J (2007) Temporary structure planning ontology. PhD thesis, Stanford University, USA.
Kim, J; Shan, Y; Kim, S; Song, D; Park, H and Bang, C (2021) Factors influencing fire safety on building construction sites: A fire officer's perspective. Journal of Construction Engineering and Management, 147(10): 04021118, ISSN 0733-9364
Kim, J J and William Ibbs, C (1995) Work-package-process model for piping construction. Journal of Construction Engineering and Management, 121(4), pp. 381-387. ISSN 0733-9364
Kim, K (2002) Distributed coordination of project schedule changes: An agent-based compensatory negotiation approach. PhD thesis, Stanford University, USA.
Kim, K; Cho, Y and Kim, K (2018) BIM-driven automated decision support system for safety planning of temporary structures. Journal of Construction Engineering and Management, 144(8): 04018072, ISSN 0733-9364
Kim, S (2008) Development of a wireless real-time productivity measurement system for rapid construction operations. PhD thesis, University of Kansas, USA.
Kim, S (2023) Disaster management and recovery: Estimating the disaster impacts on construction costs and evaluating the policy effects on disaster recovery. PhD thesis, University of Texas at Arlington, USA.
Kim, S; Ghimire, P; Jeong, H D and Barutha, P (2024) Comparative analysis of project risks across construction sectors. Journal of Construction Engineering and Management, 150(6): 04024038, ISSN 0733-9364
Kim, S; Makhmalbaf, A and Shahandashti, M (2024) Diagnosing and quantifying post-COVID-19 fluctuations in the architecture billings indices. Engineering, Construction and Architectural Management, 31(2), pp. 681-695. ISSN 0969-9988
Kim, T W; Yu, J H and Lee, H S (2003) On-site productivity evaluation through productivity achievement ratio. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Kim, Y A; Ryoo, B Y; Kim, Y S and Huh, W C (2013) Major accident factors for effective safety management of highway construction projects. Journal of Construction Engineering and Management, 139(6), pp. 628-640. ISSN 0733-9364
King, S S; Rahman, R A; Fauzi, M A and Haron, A T (2022) Critical analysis of pandemic impact on AEC organizations: The COVID-19 case. Journal of Engineering, Design and Technology, 20(1), pp. 358-383. ISSN 1726-0531
Kirby, M; Rotimi, F E and Naismith, N (2025) Factors for improving productivity in the New Zealand residential construction sector. Journal of Engineering, Design and Technology, 23(5), pp. 1712-1728. ISSN 1726-0531
Kismet, B and Colakoglu, M B (2026) Developing a building-scale circularity indicator through fuzzy analytical hierarchy process and gini index-based circularity calculation methods. International Journal of Construction Management, 26(6), pp. 994-1016. ISSN 1562-3599
Ko, C H and Chung, N F (2014) Lean design process. Journal of Construction Engineering and Management, 140(6): 4014011, ISSN 0733-9364
Ko, W H (2021) View and environmental quality in buildings. PhD thesis, University of California, Berkeley, USA.
Koch, C and Larsen, C S (2007) User driven innovation in mobile technologies? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Koehn, E and Brown, G (1985) Climatic effects on construction. Journal of Construction Engineering and Management, 111(2), pp. 129-137. ISSN 0733-9364
Koehn, E and Caplan, S B (1987) Work improvement data for small and medium size contractors. Journal of Construction Engineering and Management, 113(2), pp. 327-339. ISSN 0733-9364
Koekemoer, V and Smallwood, J (2007) Information technology (it) in the construction process. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Kog, F and Yaman, H (2016) A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(6), pp. 709-726. ISSN 0969-9988
Koh, T Y (2010) The effects of social capital on construction project success: exploring the mediating role of projectlearning. PhD thesis, University of Hong Kong, Hong Kong.
Koh T Y, T M M R S (2013) A relational approach to high reliability organising for construction project safety: A conceptual framework. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Kokkonen, A (2017) Integrated project emerging within the daily project life through active participation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kokkonen, A and Vaagaasar, A L (2018) Managing collaborative space in multi-partner projects. Construction Management and Economics, 36(2), pp. 83-95. ISSN 01446193
Kongchasing, N and Sua-iam, G (2022) The main issue working with migrant construction labor: A case study in Thailand. Engineering, Construction and Architectural Management, 29(4), pp. 1715-1730. ISSN 0969-9988
Koo, B (2004) Formalizing construction sequence constraints for the rapid generation of scheduling alternatives. PhD thesis, Stanford University, USA.
Koo, H J; O’Connor, J and Sprouse, R (2024) Analyzing the characteristics of design defect leading indicators on building construction projects. International Journal of Construction Management, 24(8), pp. 834-842. ISSN 1562-3599
Korstanje, M E (2011) Reconnecting with poverty: New challenges of disaster management. International Journal of Disaster Resilience in the Built Environment, 2(2), pp. 165-177. ISSN 1759-5916
Korstanje, M E (2014) Chile helps Chile: Exploring the effects of earthquake Chile 2010. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 380-390. ISSN 1759-5916
Kou, J.; Zhou, Z.; Guo, L.; Yang, Y.; Han, Y.; Zhang, C. and Ni, X. (2026) Multiangle computer vision-based assessment of work-related musculoskeletal disorders in construction workers. Journal of Construction Engineering and Management, 152(9): 04026141, ISSN 0733-9364
Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.
Krainer, Christiane Wagner Mainardes (2021) Model of social capital accumulation in civil construction companies. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.
Kramer, S W and Sommer, J (2013) An initial look at motivations & personality traits of American construction professionals working for international firms. International Journal of Construction Education and Research, 9(1), pp. 39-60. ISSN 1557-8771
Krcmar, C A (2022) Indian women construction workers' social construction of human security. PhD thesis, University of Massachusetts Boston, USA.
Krone, S J (1991) Decreasing the impact of changes. DSc thesis, George Washington University, USA.
Krook, J (2006) Concentrate or dilute contaminants? Strategies for Swedish wood waste. PhD thesis, Linköping University, Sweden.
Kuittinen, M and Häkkinen, T (2020) Reduced carbon footprints of buildings: New Finnish standards and assessments. Buildings & Cities, 1(1), pp. 182-197. ISSN 2632-6655
Kulatunga, U (2008) Influence of performance measurement towards construction research and development. PhD thesis, University of Salford, UK.
Kululanga, G K; Kuotcha, W; McCaffer, R and Edum-Fotwe, F (2001) Construction contractors' claim process framework. Journal of Construction Engineering and Management, 127(4), pp. 309-314. ISSN 0733-9364
Kumamoto, T; Kameda, H; Hoshiya, M and Ishii, K (1990) Construction of difficult dry dock in yokohama, Japan. Journal of Construction Engineering and Management, 116(2), pp. 201-220. ISSN 0733-9364
Kumar, S; Dhingra, A and Singh, B (2018) Lean-kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), pp. 143-160.
Kumaraswamy, M M; Miller, C J; Rahman, M M; Pickernell, D G; Ng, S T and Wong, I P Y (2006) Developing web-based tools for teaching, training, learning and development: The role of academic institutions. Architectural Engineering and Design Management, 2(1-2), pp. 123-135. ISSN 1745-2007
Kunieda, Y (2017) Development of an impact assessment tool for demolition. PhD thesis, University of Bath, UK.
Kunieda, Y; Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), pp. 2186-2205. ISSN 0969-9988
Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.
Kuoribo, E; Amoah, P; Kissi, E; Edwards, D J; Gyampo, J A and Thwala, W D (2024) Analysing the effect of multicultural workforce/teams on construction productivity. Journal of Engineering, Design and Technology, 22(3), pp. 969-990. ISSN 1726-0531
Kurwi, S (2019) Integrating BIM and GIS for design collaboration in railway projects. PhD thesis, Loughborough University, UK.
Kurwi, S; Demian, P and Hassan, T M (2017) Integrating BIM and GIS in railway projects: A critical review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kurwi, S; Demian, P; Hassan, T M and Blay, K B (2022) A process model for collaboration at the design stage of rail project delivery. Journal of Construction Engineering and Management, 148(10): 04022105, ISSN 0733-9364
Kwawu, W E K (2009) Relational contracting in the UK construction sector. PhD thesis, University of Reading, UK.
La Fleur, L (2019) Energy renovation of multi-family buildings in Sweden an evaluation of life cycle costs, indoor environment and primary energy use, and a comparison with constructing a new building. PhD thesis, Linköping University, Sweden.
Labik, O; Nahmens, I; Ikuma, L and Harvey, C (2023) On-site versus in-factory installation of solar-plus-storage in modular construction. Journal of Construction Engineering and Management, 149(5): 05023003, ISSN 0733-9364
Lahouti, A (2017) Cue-based decision-making in construction work crews: An agent-based modeling approach. PhD thesis, Michigan State University, USA.
Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.
Lam, K C and Oshodi, O S (2016) Forecasting construction output: A comparison of artificial neural network and Box-Jenkins model. Engineering, Construction and Architectural Management, 23(3), pp. 302-322. ISSN 0969-9988
Lam, P T I (2004) An investigation into the use of specifications in procuring construction works. Journal of Construction Procurement, 10(2),
Lam, P T I; Kumaraswamy, M M and Ng, S T (2004) The use of construction specifications in Singapore. Construction Management and Economics, 22(10), pp. 1067-1079. ISSN 01446193
Lam, W M (2005) A conceptual model of success for design and build projects in the public sector of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Lama, Supreet (2023) Improving design briefing with BIM-based concept generation aiming to enhance building project performance. PhD thesis, University of West London, UK.
Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.
Lamb, S and Kwok, K C S (2017) Sopite syndrome in wind-excited buildings: Productivity and wellbeing impacts. Building Research & Information, 45(3), pp. 347-358. ISSN 0961-3218
Lambers, R; Lamari, F; Skitmore, M and Rajendra, D (2024) Key residential construction defects: A framework for their identification and correlated causes. Construction Innovation, 24(6), pp. 1425-1459. ISSN 1471-4175
Langston, C (2013) The application of data envelopment analysis to the benchmarking of construction performance in Australian and American high-rise buildings. International Journal of Construction Management, 13(3), pp. 55-75. ISSN 1562-3599
Laroza, F A R (2025) Investigating construction delays in cold storage projects in the Philippines. International Journal of Construction Management, 25(6), pp. 661-671. ISSN 1562-3599
Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.
Larsson, R and Rudberg, M (2023) Effects of weather conditions on concrete work task productivity: a questionnaire survey. Construction Innovation, 23(2), pp. 306-321. ISSN 1471-4175
Lawani, K; Sadeghineko, F; Tong, M and Bayraktar, M (2025) Methodology for retrospectively developing a BIM model from point cloud scans using ongoing building project as case study. Journal of Engineering, Design and Technology, 23(4), pp. 1243-1261. ISSN 1726-0531
Le, K T (2017) Material inventory control and management system in construction using GIS applications and a "hybrid" tracking system. PhD thesis, Illinois Institute of Technology, USA.
Lean, C S (2001) Empirical tests to discern linkages between construction and other economic sectors in Singapore. Construction Management and Economics, 19(4), pp. 355-363. ISSN 01446193
Ledbetter, W B (1994) Quality performance on successful project. Journal of Construction Engineering and Management, 120(1), pp. 34-46. ISSN 0733-9364
Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(4), pp. 1679-1696. ISSN 0969-9988
Lee, D and Han, K (2025) Autonomous navigation and positioning of a real-time and automated mobile robotic welding system. Journal of Construction Engineering and Management, 151(5): 04025033, ISSN 0733-9364
Lee, E B; Harvey, J T and Thomas, D (2005) Integrated design/construction/operations analysis for fast-track urban freeway reconstruction. Journal of Construction Engineering and Management, 131(12), pp. 1283-1291. ISSN 0733-9364
Lee, E B and Ibbs, C W (2005) Computer simulation model: Construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering and Management, 131(4), pp. 449-458. ISSN 0733-9364
Lee, E B; Lee, H and Harvey, J T (2006) Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study. Journal of Construction Engineering and Management, 132(5), pp. 465-472. ISSN 0733-9364
Lee, E B; Lee, H and Ibbs, C W (2007) Productivity aspects of urban freeway rehabilitation with accelerated construction. Journal of Construction Engineering and Management, 133(10), pp. 798-806. ISSN 0733-9364
Lee, E B; Roesler, J; Harvey, J T and Ibbs, C W (2002) Case study of urban concrete pavement reconstruction on Interstate 10. Journal of Construction Engineering and Management, 128(1), pp. 49-56. ISSN 0733-9364
Lee, E B and Thomas, D K (2007) State-of-practice technologies on accelerated urban highway rehabilitation: I-15 California experience. Journal of Construction Engineering and Management, 133(2), pp. 105-113. ISSN 0733-9364
Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Lee, G; Lee, G; Chi, S and Oh, S (2023) Automatic classification of construction work codes in bill of quantities of national roadway based on text analysis. Journal of Construction Engineering and Management, 149(2): 04022163, ISSN 0733-9364
Lee, H S; Seo, J O; Park, M; Ryu, H G and Kwon, S S (2009) Transaction-cost-based selection of appropriate general contractor-subcontractor relationship type. Journal of Construction Engineering and Management, 135(11), pp. 1232-1240. ISSN 0733-9364
Lee, W and Migliaccio, G C (2018) Temporal effect of construction workforce physical strain on diminishing marginal productivity at the task level. Journal of Construction Engineering and Management, 144(9): 04018083, ISSN 0733-9364
Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.
Legesse, A; Nejat, A and Ghebrab, T (2025) The coupling of project delivery methods and contract strategies for public building projects in Ethiopia. Construction Innovation, 25(2), pp. 400-418. ISSN 1471-4175
Lehtovaara, J; Seppänen, O and Peltokorpi, A (2022) Improving construction management with decentralised production planning and control: Exploring the production crew and manager perspectives through a multi-method approach. Construction Management and Economics, 40(4), pp. 254-277. ISSN 01446193
Lehtovaara, J; Seppänen, O; Peltokorpi, A; Kujansuu, P and Grönvall, M (2021) How Takt production contributes to construction production flow: A theoretical model. Construction Management and Economics, 39(1), pp. 73-95. ISSN 01446193
Lehtovaara, Joonas (2023) Takt production and decentralized decision-making: Improving construction production flow with novel planning & control approaches. DScTech thesis, Aalto University, Finland.
Leiringer, R (2001) Developing an effective model to support construction companies entering the public-private partnership projects' market. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Leiringer, R (2003) Technological innovations in the context of public-private partnership projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.
Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193
Leu, S S and Hwang, S T (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, 127(4), pp. 270-280. ISSN 0733-9364
Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193
Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193
Leung, M Y; Chan, Y S and Olomolaiye, P (2008) Impact of stress on the performance of construction project managers. Journal of Construction Engineering and Management, 134(8), pp. 644-652. ISSN 0733-9364
Leung, M Y; Chan, Y S and Yu, J (2009) Integrated model for the stressors and stresses of construction project managers in Hong Kong. Journal of Construction Engineering and Management, 135(2), pp. 126-134. ISSN 0733-9364
Leung, M Y; Ng, S T; Skitmore, M and Cheung, S O (2005) Critical stressors influencing construction estimators in Hong Kong. Construction Management and Economics, 23(1), pp. 33-44. ISSN 01446193
Leung, M Y; Zhang, H and Skitmore, M (2008) Effects of organizational supports on the stress of construction estimation participants. Journal of Construction Engineering and Management, 134(2), pp. 84-93. ISSN 0733-9364
Leung, W Y (2006) A study of the competitiveness of local contractors in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Lew, Y L; Hassim, S; Muniandy, R and Hua, L T (2018) Structural equation modelling for subcontracting practice: Malaysia chapter. Engineering, Construction and Architectural Management, 25(7), pp. 835-860. ISSN 0969-9988
Lewis, T M (1984) A review of the causes of recent problems in the construction industry of Trinidad and Tobago. Construction Management and Economics, 2(1), pp. 37-48. ISSN 01446193
Lewis, T M (2004) The construction industry in the economy of Trinidad and Tobago. Construction Management and Economics, 22(5), pp. 541-549. ISSN 01446193
Li, H.; Wei, Q.; Liu, J.; Bao, X.; Ma, Y. and Hong, Y. (2026) How relationship-specific memory affects the operational resilience of cross-border critical infrastructure systems through inter-organizational improvisation. Engineering, Construction and Architectural Management, pp. 1-28. ISSN 0969-9988
Li, H; Xie, T; Liu, Y; Cui, C; Xia, B; Li, Y and Hou, X (2026) Influence of stressful events on work engagement of construction workers during emergency infrastructure projects: Analysis using affective events theory and self-efficacy theory. Journal of Construction Engineering and Management, 152(4): 04026012, ISSN 0733-9364
Li, L; Sandanayake, M; Yang, A; Izadyar, N; Chen, S; O'Brien, D and Vrcelj, Z (2026) A virtual platform for managing building inspections during the construction of detached dwellings. International Journal of Construction Management, 26(2), pp. 295-315. ISSN 1562-3599
Li, X.; Lin, M.; Chen, J. and Jim, C. Y. (2026) A lifecycle-based risk assessment framework for prefabricated building supply chains using G1-entropy weight and cloud matter-element models. Engineering, Construction and Architectural Management, 33(7), pp. 5645-5674. ISSN 0969-9988
Li, H; Chan, N K Y and Skitmore, M (2012) The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. Construction Innovation, 12(4), pp. 429-446. ISSN 1471-4175
Li, H; Guo, H; Skibniewski, M J and Skitmore, M (2008) Using the IKEA model and virtual prototyping technology to improve construction process management. Construction Management and Economics, 26(9), pp. 991-1000. ISSN 1466433X
Li, H; Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(3), pp. 211-220. ISSN 0969-9988
Li, H; Luo, X and Skitmore, M (2020) Intelligent hoisting with car-like mobile robots. Journal of Construction Engineering and Management, 146(12): 04020136, ISSN 0733-9364
Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364
Li, Liancheng (2025) Towards sustainable recovery of waste plastics with the Australian construction industry: Transition scenarios and environmental impact evaluation. PhD thesis, University of Adelaide, Australia.
Li, Mei (2012) A waste management system for small and medium enterprises engaged in office building retrofit projects. PhD thesis, Queensland University of Technology, Australia.
Li, R and Roberti, R (2017) Optimal scheduling of railway track possessions in large-scale projects with multiple construction works. Journal of Construction Engineering and Management, 143(6): 04017007, ISSN 0733-9364
Li, W (1995) Benefit and cost analysis: Three-dimensional computer models with integrated databases in the management of construction. PhD thesis, Columbia University, USA.
Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X
Li, Y and Liu, C (2010) Malmquist indices of total factor productivity changes in the Australian construction industry. Construction Management and Economics, 28(9), pp. 933-945. ISSN 1466433X
Li, Y and Taylor, T R B (2014) Modeling the impact of design rework on transportation infrastructure construction project performance. Journal of Construction Engineering and Management, 140(9): 04014044, ISSN 0733-9364
Liang, C J; Wang, X; Kamat, V R and Menassa, C C (2021) Human-robot collaboration in construction: Classification and research trends. Journal of Construction Engineering and Management, 147(10): 03121006, ISSN 0733-9364
Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.
Liang, X; Rasheed, U; Cai, J; Wibranek, B and Awolusi, I (2024) Impacts of collaborative robots on construction work performance and worker perception: Experimental analysis of human-robot collaborative wood assembly. Journal of Construction Engineering and Management, 150(8): 04024087, ISSN 0733-9364
Lim, H W and Ma, X (2026) Improving mental wellbeing of project supervisors: Shifting from project-focused to process-focused construction practices. Journal of Construction Engineering and Management, 152(1): 04025229, ISSN 0733-9364
Lim, E C (1996) The analysis of productivity in building construction. PhD thesis, Loughborough University, UK.
Limsila, K and Ogunlana, S O (2008) Linking personal competencies with transformational leadership style evidence from the construction industry in Thailand. Journal of Construction in Developing Countries, 13(1), pp. 27-50. ISSN 1823-6499
Lin, F.; Cheng, Y. and Zhang, J. (2026) Efficient rebar layout estimation enabled by a custom detection network and enhanced visual measurement. Journal of Construction Engineering and Management, 152(9): 04026152, ISSN 0733-9364
Lindebaum, D and Jordan, P J (2012) Relevant but exaggerated: The effects of emotional intelligence on project manager performance in construction. Construction Management and Economics, 30(7), pp. 575-583. ISSN 1466433X
Lindhard, S and Wandahl, S (2014) Exploration of the reasons for delays in construction. International Journal of Construction Management, 14(1), pp. 36-44. ISSN 1562-3599
Lindholm, J; Johansson, P and Yitmen, I (2025) Toward a BIM information delivery framework based on common data environment. Construction Innovation, 25(7), pp. 139-157. ISSN 1471-4175
Lindén, S and Josephson, P E (2013) In-housing or out-sourcing on-site materials handling in housing? Journal of Engineering, Design and Technology, 11(1), pp. 90-106. ISSN 1726-0531
Lingard, H (1995) Safety in Hong Kong's construction industry: changing worker behaviour. PhD thesis, University of Hong Kong, Hong Kong.
Lingard, H; Cooke, T and Gharaie, E (2013) The how and why of plant-related fatalities in the Australian construction industry. Engineering, Construction and Architectural Management, 20(4), pp. 365-380. ISSN 0969-9988
Lingard, H; Francis, V and Turner, M (2010) It’s about time: The impact of fluctating work hours on the work-life balance of project-based construction workers. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Lingard, H; Pirzadeh, P and Oswald, D (2019) Talking safety: Health and safety communication and safety climate in subcontracted construction workgroups. Journal of Construction Engineering and Management, 145(5): 04019029, ISSN 0733-9364
Lingard, H and Rowlinson, S (1998) Behaviour-based safety management in Hong Kong's construction industry: The results of a field study. Construction Management and Economics, 16(4), pp. 481-488. ISSN 01446193
Lingard, H; Warmerdam, A and Shooshtarian, S (2019) Getting the balance right: Regulating occupational health and safety planning and coordination in the Australian construction industry. Engineering, Construction and Architectural Management, 26(4), pp. 599-617. ISSN 0969-9988
Lingard, H; Zhang, R P and Oswald, D (2019) Effect of leadership and communication practices on the safety climate and behaviour of construction workgroups. Engineering, Construction and Architectural Management, 26(6), pp. 886-906. ISSN 0969-9988
Linh, T N Q; Hanh, T T T and Shaw, R (2021) COVID-19 initial preparedness and response in Vietnam during the first six months of the pandemic and the lessons for Sendai framework implementation. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 143-155. ISSN 1759-5916
Liu, W.; Luo, X.; Feng, Z.; Liang, B. and Fan, G. (2026) Research on risk propagation mechanism and control strategy of prefabricated building supply chain: Based on complex network model and dynamic simulation analysis. Engineering, Construction and Architectural Management, 33(7), pp. 5901-5933. ISSN 0969-9988
Liu, C and Zhu, R (2017) Measuring output structures of multinational construction industries using the world input-output database. International Journal of Construction Management, 17(1), pp. 1-12. ISSN 1562-3599
Liu, D; Sun, J; Zhong, D and Song, L (2012) Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9), pp. 1085-1094. ISSN 0733-9364
Liu, J; Shahi, A; Haas, C T; Goodrum, P and Caldas, C H (2014) Validation methodologies and their impact in construction productivity research. Journal of Construction Engineering and Management, 140(10): 04014046, ISSN 0733-9364
Liu, J; Chen, J; Tian, J and Li, Y (2025) An efficient random key-based genetic algorithm for solving multimode resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 151(12): 04025193, ISSN 0733-9364
Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.
Liu, K and Golparvar-Fard, M (2015) Crowdsourcing construction activity analysis from jobsite video streams. Journal of Construction Engineering and Management, 141(11): 04015035, ISSN 0733-9364
Liu, L; Wang, X and Sheng, Z (2012) Achieving ambidexterity in large, complex engineering projects: A case study of the sutong bridge project. Construction Management and Economics, 30(5), pp. 399-409. ISSN 1466433X
Liu, Q; Ye, G; Feng, Y; Wang, C and Peng, Y (2020) Case-based insights into rework costs of residential building projects in China. International Journal of Construction Management, 20(4), pp. 347-355. ISSN 1562-3599
Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(1), pp. 128-149. ISSN 0969-9988
Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364
Liu, X; Song, Y; Yi, W; Wang, X and Zhu, J (2018) Comparing the random forest with the generalized additive model to evaluate the impacts of outdoor ambient environmental factors on scaffolding construction productivity. Journal of Construction Engineering and Management, 144(6): 04018037, ISSN 0733-9364
Liu, Y (2009) Critical factors for managing project communication among participants at the construction stage. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Lizarralde, G.; Wachsmuth, D.; Özdoğan, F. and Cossu, M. (2026) Critical reconstruction theory and the invention of post-disaster response. Buildings & Cities, 7(1), pp. 683-703. ISSN 2632-6655
Lloyd, C A (2020) Modular manufacture and construction of small nuclear power generation systems. PhD thesis, University of Cambridge, UK.
Lochau-Emden, G H (1983) A manufacturers' exchange as a source of information for strategic management and an economic stabilising aid in the building and construction sector: A theoretical and empirical study. DBA thesis, University of Pretoria, South Africa.
Loganathan, S and Forsythe, P (2020) Unravelling the influence of teamwork on trade crew productivity: A review and a proposed framework. Construction Management and Economics, 38(11), pp. 1040-1060. ISSN 01446193
Loganathan, S; Forsythe, P and Kalidindi, S N (2018) Work practices of onsite construction crews and their influence on productivity. Construction Economics and Building, 18(3), pp. 18-39. ISSN 2204-9029
Loganathan, Santhosh (2023) A framework for analysing the influence of teamwork processes of onsite construction trade crews on productivity. PhD thesis, University of Technology Sydney, Australia.
London, K; Kenley, R and Agapiou, A (1998) Theoretical supply chain network modelling in the building industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Longo, Leticia França Mattaraia (2020) Design for disassembly and BIM: Design tools to improve the reuse of materials. PhD thesis, Universidade de São Paulo, Brazil.
Loosemore, M (2014) Rebalancing the construction productivity debate. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Loosemore, M; Alkilani, S Z and Luperdi, S (2021) Productivity and industrial relations in the Australian construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 167-176. ISSN 17514304
Loosemore, M and Denny-Smith, G (2016) Barriers to indigenous enterprise in the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Lopes, J (2003) The relationship between construction outputs and GDP: Long-run trends from Portugal. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Lopes, Manoela Gomes Reis (2016) Formative approach to accident prevention in the building construction process. PhD thesis, Universidade de São Paulo, Brazil.
Lopez Del Puerto, C; Strong, K and Miller, M (2013) Analysis of owners safety management approaches in design-build projects. International Journal of Construction Education and Research, 9(4), pp. 307-316. ISSN 1557-8771
Love, P E D (2026) Quantifying the costs of field rework in construction. Journal of Construction Engineering and Management, 152(1): 06025003, ISSN 0733-9364
Love, P; Smith, J and Han, S (2011) Systemic rework risk classification for offshore projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.
Love, P E D (2002) Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 18-29. ISSN 0733-9364
Love, P E D; Ackermann, F; Teo, P and Morrison, J (2015) From individual to collective learning: A conceptual learning framework for enacting rework prevention. Journal of Construction Engineering and Management, 141(11): 05015009, ISSN 0733-9364
Love, P E D; Davis, P R; Lopez, R and Jasper, T (2008) It’s not just about bricks and mortar: Procedural failures in construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Love, P E D; Edwards, D J; Irani, Z and Goh, Y M (2011) Dynamics of rework in complex offshore hydrocarbon projects. Journal of Construction Engineering and Management, 137(12), pp. 1060-1070. ISSN 0733-9364
Love, P E D; Edwards, D J and Smith, J (2005) Contract documentation and the incidence of rework in projects. Architectural Engineering and Design Management, 1(4), pp. 247-259. ISSN 1745-2007
Love, P E D; Edwards, D J and Smith, J (2016) Rework causation: Emergent theoretical insights and implications for research. Journal of Construction Engineering and Management, 142(6): 04016010, ISSN 0733-9364
Love, P E D; Edwards, D J; Watson, H and Davis, P (2010) Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), pp. 275-282. ISSN 0733-9364
Love, P E D; Leonard, D; Matthews, J; Ford, G and Fang, W (2024) Setting a course to validate and operationalize quality II in construction. Journal of Construction Engineering and Management, 150(12): 06024002, ISSN 0733-9364
Love, P E D and Li, H (2000) Overcoming the problems associated with quality certification. Construction Management and Economics, 18(2), pp. 139-149. ISSN 01446193
Love, P E D; Mandal, P; Smith, J and Heng, L I (2000) Modelling the dynamics of design error induced rework in construction. Construction Management and Economics, 18(5), pp. 567-574. ISSN 01446193
Love, P E D; Manual, P and Li, H (1999) Determining the causal structure of rework influences in construction. Construction Management and Economics, 17(4), pp. 505-517. ISSN 01446193
Love, P E D and Matthews, J (2023) Hold-ups and failures in negotiated order: Unearthing the nuances of rework causation in construction. Journal of Construction Engineering and Management, 149(3): 06023001, ISSN 0733-9364
Love, P E D; Matthews, J and Fang, W (2020) Rework in construction: A focus on error and violation. Journal of Construction Engineering and Management, 146(9): 06020001, ISSN 0733-9364
Love, P E D; Matthews, J and Fang, W (2021) Envisioning rework in practice: Emergent insights from a longitudinal study. Journal of Construction Engineering and Management, 147(1): 06020002, ISSN 0733-9364
Love, P E D; Matthews, J and Fang, W (2021) Reflections on the risk and uncertainty of rework in construction. Journal of Construction Engineering and Management, 147(4), ISSN 0733-9364
Love, P E D; Smith, J; Treloar, G J and Li, H (2000) Some empirical observations of service quality in construction. Engineering, Construction and Architectural Management, 7(2), pp. 191-201. ISSN 0969-9988
Love, P E D and Teo, P (2017) Statistical analysis of injury and nonconformance frequencies in construction: Negative binomial regression model. Journal of Construction Engineering and Management, 143(8): 05017011, ISSN 0733-9364
Love, P E D; Teo, P and Morrison, J (2018) Revisiting quality failure costs in construction. Journal of Construction Engineering and Management, 144(2): 05017020, ISSN 0733-9364
Love, P E D; Teo, P; Morrison, J and Grove, M (2016) Quality and safety in construction: Creating a no-harm environment. Journal of Construction Engineering and Management, 142(8): 5016006, ISSN 0733-9364
Love, P E D (2025) Boosting: Improving people's decision-making competences in construction. Journal of Construction Engineering and Management, 151(12): 06025002, ISSN 0733-9364
Low, S P (2012) Strategic development of the built environment through international construction, quality and productivity management. DSc thesis, University of Birmingham, UK.
Lowe, J (1993) Construction productivity: an input-output approach. PhD thesis, Glasgow Caledonian University, UK.
Lowe, J (1997) Labour productivity trends for the UK construction sector. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Lowe, J G (1997) Insolvency in the UK construction industry. Journal of Financial Management of Property and Construction, 2(1), pp. 83-112. ISSN 1366-4387
Lu, M; Lau, S C and Poon, C S (2009) Simulation approach to evaluating cost efficiency of selective demolition practices: Case of Hong Kong's Kai Tak Airport demolition. Journal of Construction Engineering and Management, 135(6), pp. 448-457. ISSN 0733-9364
Lu, N and Liska, R W (2008) Designers' and general contractors' perceptions of offsite construction techniques in the united state construction industry. International Journal of Construction Education and Research, 4(3), pp. 177-188. ISSN 1557-8771
Lu, W; Tan, T; Xu, J; Wang, J; Chen, K; Gao, S and Xue, F (2021) Design for manufacture and assembly (DfMA) in construction: The old and the new. Architectural Engineering and Design Management, 17(1-2), pp. 77-91. ISSN 1745-2007
Lu, W; Wu, L; Zhao, R; Li, X and Xue, F (2021) Blockchain technology for governmental supervision of construction work: Learning from digital currency electronic payment systems. Journal of Construction Engineering and Management, 147(10): 02148, ISSN 0733-9364
Lucini, B (2013) Social capital and sociological resilience in megacities context. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 58-71. ISSN 1759-5916
Luck, R (2015) Organising design in the wild: Locating multidisciplinarity as a way of working. Architectural Engineering and Design Management, 11(2), pp. 149-162. ISSN 1745-2007
Lucko, G; Helinski, P O and Ballesteros-Pérez, P (2026) Universal model for performance and delay tracking of linear construction schedules. Journal of Construction Engineering and Management, 152(5): 04026035, ISSN 0733-9364
Lukhele, T M; Botha, B and Mbanga, S (2023) Exploring the nexus between professional ethics and occupational health and safety in construction projects: A case study approach. International Journal of Construction Management, 23(12), pp. 2048-2057. ISSN 1562-3599
Lummen, N S; Shirozu, H; Okada, N and Yamada, F (2016) Flood risk management an illustrative approach. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 388-405. ISSN 1759-5916
Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work. PhD thesis, University of Michigan, USA.
Luo, Z; Jiang, Y; Li, X; Wu, R and Pan, H (2026) Financing mode selection and key success factors in area comprehensive development projects based on if-multimoora. Journal of Construction Engineering and Management, 152(4): 04026032, ISSN 0733-9364
Luo, J; Zadeh, P and Staub-French, S (2024) Ontology-based design features for representing constructability in architectural design: Toward BIM in off-site construction. Journal of Construction Engineering and Management, 150(10): 05024010, ISSN 0733-9364
Luo, M; Fan, H Q and Liu, G (2020) Measuring regional differences of construction productive efficiency in China: A distance friction minimization approach. Engineering, Construction and Architectural Management, 27(4), pp. 952-974. ISSN 0969-9988
Luu, C; Bui, Q D and von Meding, J K (2023) Mapping direct flood impacts from a 2020 extreme flood event in central Vietnam using spatial analysis techniques. International Journal of Disaster Resilience in the Built Environment, 14(1), pp. 85-99. ISSN 1759-5916
Lynch, H (2014) Passivhaus in the UK: the challenges of an emerging market: a case study of innovation using mixed methods research. PhD thesis, University College London, UK.
Löfgren, A (2008) Making mobile meaning: Expectations and experiences of mobile computing usefulness in construction site management practice. PhD thesis, KTH Royal Institute of Technology, Sweden.
Löwstedt, M and Sandberg, R (2020) Standardizing the free and independent professional: The case of construction site managers in Sweden. Engineering, Construction and Architectural Management, 27(6), pp. 1337-1355. ISSN 0969-9988
Lützkendorf, T and Balouktsi, M (2022) Embodied carbon emissions in buildings: Explanations, interpretations, recommendations. Buildings & Cities, 3(1), pp. 964-973. ISSN 2632-6655
M.S, M; Katpatal, Y B and Londhe, D S (2024) Measurement of city road network resilience in hazardous flood events. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 274-288. ISSN 1759-5916
Ma, L and Liu, C (2018) Decomposition of temporal changes in construction labour productivity. International Journal of Construction Management, 18(1), pp. 65-77. ISSN 1562-3599
Ma, Z; Chong, H Y and Liao, P C (2021) Development of a time-variant causal model of human error in construction with dynamic Bayesian network. Engineering, Construction and Architectural Management, 28(1), pp. 291-307. ISSN 0969-9988
Maauf, N A A (2021) The development of a framework to improve materials management on Libyan construction sites. PhD thesis, University of Salford, UK.
MacAskill, K and Guthrie, P (2016) Disaster risk reduction and empowering local government: a case comparison between Sri Lanka and New Zealand. International Journal of Disaster Resilience in the Built Environment, 7(4), pp. 318-329. ISSN 1759-5916
MacKenzie, A (2017) Planning for the redevelopment after a fire event. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 344-356. ISSN 1759-5916
Machete, S M (1997) Waste management in construction sites of emerging contractors in South Africa. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Macintosh, A and Steemers, K (2005) Ventilation strategies for urban housing: Lessons from a PoE case study. Building Research & Information, 33(1), pp. 17-31. ISSN 0961-3218
Mackee, J; Askland, H H and Askew, L (2014) Recovering cultural built heritage after natural disasters: A resilience perspective. International Journal of Disaster Resilience in the Built Environment, 5(2), pp. 202-212. ISSN 1759-5916
Macpherson, S J; Kelly, J R and Webb, R S (1993) How designs develop: Insights from case studies in building engineering services. Construction Management and Economics, 11(6), pp. 475-485. ISSN 01446193
Madanayake, U H and Çıdık, M S (2019) The potential of digital technology to improve construction productivity. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Mahamadu, A M; Mahdjoubi, L; Booth, C; Manu, P and Manu, E (2019) Building information modelling (BIM) capability and delivery success on construction projects. Construction Innovation, 19(2), pp. 170-192. ISSN 1471-4175
Mahamid, I (2013) Contractors' perspective toward factors affecting labor productivity in building construction. Engineering, Construction and Architectural Management, 20(4), pp. 446-460. ISSN 0969-9988
Mahamid, I (2017) Effect of change orders on rework in highway projects in Palestine. Journal of Financial Management of Property and Construction, 22(1), pp. 62-76. ISSN 1366-4387
Mahamid, I (2022) Impact of rework on material waste in building construction projects. International Journal of Construction Management, 22(8), pp. 1500-1507. ISSN 1562-3599
Mahasuar, K (2023) COVID-19 and its impact on Indian construction industry: An event study approach. Construction Management and Economics, 41(5), pp. 428-444. ISSN 01446193
Mahmoudi Motahar, M and Hosseini Nourzad, S H (2022) A hybrid method for optimizing selective disassembly sequence planning in adaptive reuse of buildings. Engineering, Construction and Architectural Management, 29(1), pp. 307-332. ISSN 0969-9988
Maisarah, F; Abduh, M; Wirahadikusumah, R and Cakravastia, A (2025) Development of the conceptual business model of a third-party logistics provider for Indonesian small contractors. International Journal of Construction Management, 25(2), pp. 194-203. ISSN 1562-3599
Majrouhi Sardroud, J (2011) Assessment and development of radio frequency identification applications for effective management of construction activities. PhD thesis, Kingston University, UK.
Mak, S W K (1992) Risk management in construction: A study of subjective judgments. PhD thesis, London, External, UK.
Makarfi Ibrahim, Y; Kaka, A; Aouad, G and Kagioglou, M (2009) Framework for a generic work breakdown structure for building projects. Construction Innovation, 9(4), pp. 388-405. ISSN 1471-4175
Makulsawatudom, A (2003) Construction productivity measurement and improvement in Thailand by improved work-sampling. PhD thesis, University of Strathclyde, UK.
Makulsawatudom, A and Emsley, M (2001) Factors affecting the productivity of the construction industry in Thailand: The project managers' perception. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Makwiranzou, C (2019) Building trust and managing risk between the client, consultant, and contractor in traditional and relational construction projects. PhD thesis, University of Liverpool, UK.
Malabi Eberhardt, L C; Kuittinen, M; Häkkinen, T; Moinel, C; Nibel, S and Birgisdottir, H (2024) Carbon handprint: A review of potential climate benefits of buildings. Building Research & Information, 52(6), pp. 708-723. ISSN 0961-3218
Malekaee Ashtiyani, F; Karimi Gavareshki, M H and Gheidar-Kheljani, J (2026) AI-based multi-layer framework for monitoring productivity and coordinating subcontractors in construction projects. International Journal of Construction Management, 26(5), pp. 905-924. ISSN 1562-3599
Malekzadeh, H; Edwards, D J and Harris, F C (2005) Simulating the ground freezing process: a decision support model. Journal of Construction Research, 6(1), pp. 107-121. ISSN 1609-9451
Maloney, W F (1983) Productivity improvement: The influence of labor. Journal of Construction Engineering and Management, 109(3), pp. 321-334. ISSN 0733-9364
Maloney, W F; Cameron, I and Hare, B (2007) Tradesmen involvement in health and safety. Journal of Construction Engineering and Management, 133(4), pp. 297-305. ISSN 0733-9364
Maloney, W F and McFillen, J M (1986) Motivational implications of construction work. Journal of Construction Engineering and Management, 112(1), pp. 137-151. ISSN 0733-9364
Maly, E and Ishikawa, E (2014) Planning for relocation in recovery after the great East Japan earthquake: Considering residential relocation in historic and international contexts. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 243-259. ISSN 1759-5916
Manavazhi, M R (2004) Assessment of the propensity for revisions in design projects through the dichotomous characterization of designer effort. Construction Management and Economics, 22(1), pp. 47-54. ISSN 01446193
Mane, K M; Kulkarni, D K and Prakash, K B (2021) Prediction of shear strength of concrete produced by using pozzolanic materials and partly replacing nfa by MS using ann. Journal of Engineering, Design and Technology, 19(2), pp. 578-587. ISSN 1726-0531
Maniar, H (2020) Contingency management in Indian construction projects. Journal of Construction Business and Management, 4(2), pp. 11-24. ISSN 2521-0165
Manivannan, J; Loganathan, S; Kamalanabhan T J and Kalidindi, S N (2022) Investigating the relationship between occupational stress and work-life balance among Indian construction professionals. Construction Economics and Building, 22(2), pp. 27-51. ISSN 2204-9029
Manley, K and Marceau, J (2002) Integrated manufacturing-services businesses in the Australian building and construction sector. Construction Economics and Building, 2(1), pp. 1-12. ISSN 2204-9029
Mannakkara, S and Wilkinson, S (2015) Supporting post-disaster social recovery to build back better. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 126-139. ISSN 1759-5916
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A competency-based training guide model for labourers in construction. International Journal of Construction Management, 23(8), pp. 1323-1333. ISSN 1562-3599
Manoj, G and Shivaji, C Y (2010) Design interface management of airport projects. International Journal of Construction Management, 10(3), pp. 29-44. ISSN 1562-3599
Maqsood, Tayyab (2006) Role of knowledge management in supporting innovation and learning in construction. PhD thesis, RMIT University, Australia.
Maqsoom, A; Choudhry, R M; Umer, M and Mehmood, T (2021) Influencing factors indicating time delay in construction projects: Impact of firm size and experience. International Journal of Construction Management, 21(12), pp. 1251-1262. ISSN 1562-3599
Mararo, I. M.; Babafemi, A. J. and Aigbavboa, C. (2026) Towards understanding the perceptions of 3D construction printing in Kenya. International Journal of Construction Management, 26(7), pp. 1320-1340. ISSN 1562-3599
Marasini, R (2002) An integrated simulation approach for realising efficient stockyard layouts: An application in the precast concrete products industry. PhD thesis, University of Teesside, UK.
Mariaca Clavel, Israel Simon (2025) Dynamic construction scheduling: Utilizing AI data automation in a BIM-integrated serious game framework. PhD thesis, University College London, UK.
Marique, Y (2013) Cooperation and competition in complex construction projects: Implementation of EU procurement rules in England and Belgium. International Journal of Law in the Built Environment, 5(1), pp. 53-70. ISSN 17561469
Markkanen, P and Herneoja, A (2024) Constructing a theory-informed workplace design framework: co-design case study for knowledge work environment satisfaction improvement. Building Research & Information, 52(8), pp. 870-886. ISSN 0961-3218
Martinez, P; Livojevic, M; Jajal, P; Aldrich, D R; Al-Hussein, M and Ahmad, R (2020) Simulation-driven design of wood framing support systems for off-site construction machinery. Journal of Construction Engineering and Management, 146(7): 04020075, ISSN 0733-9364
Martinez Lagunas, A J and Nik-Bakht, M (2024) Process mining, modeling, and management in construction: A critical review of three decades of research coupled with a current industry perspective. Journal of Construction Engineering and Management, 150(11): 04024158, ISSN 0733-9364
Marton, J (2004) In search of organisational legitimacy construction sites. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
Mashamba, M S (1997) The construction industry in Zambia: opportunities and constraints under the structural adjustment programme and the enabling shelter strategy. PhD thesis, University of Newcastle upon Tyne, UK.
Mashamba, T (2024) A system dynamics model to enhance on-time delivery of infrastructure projects within a power utility in South Africa. PhD thesis, University of South Africa, South Africa.
Matete, R; Emuze, F and Smallwood, J (2024) Controlling the risk of site dust exposures in South African construction. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Mattar, S G (1983) Segmental post-tensioned dolphin at Tagrin Point. Journal of Construction Engineering and Management, 109(3), pp. 276-285. ISSN 0733-9364
Mattaraia, L; Fabricio, M M and Codinhoto, R (2023) Structure for the classification of disassembly applied to BIM models. Architectural Engineering and Design Management, 19(1), pp. 56-73. ISSN 1745-2007
Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(4), pp. 629-638. ISSN 1562-3599
Mayara Regina, M and Tavares, S F (2021) Materials passport's review: Challenges and opportunities toward a circular economy building sector. Built Environment Project and Asset Management, 11(4), pp. 767-782. ISSN 2044-124X
Mayer, M (2020) Material recovery certification for construction workers. Buildings & Cities, 1(1), pp. 550-564. ISSN 2632-6655
Mbiti, Titus (2008) System dynamics model of construction output in Kenya. PhD thesis, RMIT University, Australia.
McAnulty, S and Baroudi, B (2010) Construction challenges in remote Australian locations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
McCaffer, R (1976) Contractors' bidding behaviour and tender price prediction. PhD thesis, Loughborough University, UK.
McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.
McCloughan, P (2004) Construction sector concentration: Evidence from Britain. Construction Management and Economics, 22(9), pp. 979-990. ISSN 01446193
McCoy, A P; Thabet, W and Badinelli, R (2008) Towards establishing a domain specific commercialization model for innovation in residential construction. Construction Innovation, 8(2), pp. 137-155. ISSN 1471-4175
McDavid, H A (1996) Construction and economic development: A stimulus or constraint in developing countries. DSc thesis, George Washington University, USA.
McDonald, P R (1984) Construction claims costing for owners and contractors. Construction Management and Economics, 2(1), pp. 1-12. ISSN 01446193
McFillen, J M and Maloney, W F (1986) Human resource data in the construction industry. Journal of Construction Engineering and Management, 112(1), pp. 22-32. ISSN 0733-9364
McGee, S; Frittman, J; Ahn, S J and Murray, S (2016) Implications of cascading effects for the Hyogo Framework. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 144-157. ISSN 1759-5916
McGill, G; Oyedele, L O and McAllister, K (2015) An investigation of indoor air quality, thermal comfort and sick building syndrome symptoms in UK energy efficient homes. Smart and Sustainable Built Environment, 4(3), pp. 329-348. ISSN 2046-6099
McGill, G; Sharpe, T; Robertson, L; Gupta, R and Mawditt, I (2017) Meta-analysis of indoor temperatures in new-build housing. Building Research & Information, 45(1-2), pp. 19-39. ISSN 0961-3218
McLellan, R (1994) The use of project management procedures by construction contractors. PhD thesis, University of Strathclyde, UK.
McMeel, D (2009) The artistry of construction: an investigation into construction as a creative process and the influence of mobile phones within domestic scale construction projects. PhD thesis, University of Edinburgh, UK.
Mehmet, O and Yorucu, V (2008) Explosive construction in a micro-state: Environmental limit and the Bon curve: Evidence from North Cyprus. Construction Management and Economics, 26(1), pp. 79-88. ISSN 1466433X
Mehran Mahmoudi, M; Seyed Hossein Hosseini, N and Rahimi, F (2024) Integrating complete disassembly planning with deconstructability assessment to facilitate designing deconstructable buildings. Architectural Engineering and Design Management, 20(1), pp. 150-167. ISSN 1745-2007
Mei, X; Xu, F; Zhang, Z and Tao, Y (2025) Unsafe behavior identification on construction sites by combining computer vision and knowledge graph-based reasoning. Engineering, Construction and Architectural Management, 32(12), pp. 8360-8389. ISSN 0969-9988
Melbourne, R E (1996) Advance base construction by civilian contractors in war zones. PhD thesis, University of Southern California, USA.
Memarian, B (2012) Development of high reliability construction work systems: Lessons from production practices of high performance work crews. PhD thesis, Arizona State University, USA.
Mendes, J M; Tavares, A O and Santos, P P (2020) Social vulnerability and local level assessments: A new approach for planning. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 15-43. ISSN 1759-5916
Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364
Meng, F and Cao, X (2025) An intelligent framework for rework risk identification in prefabricated construction processes based on compliance checking. Engineering, Construction and Architectural Management, 32(8), pp. 5066-5098. ISSN 0969-9988
Merdinger, C J (1949) A history of civil engineering. PhD thesis, University of Oxford, UK.
Messah, Y; Wirahadikusumah, R and Abduh, M (2023) Structural equation model (SEM) of the factors affecting sustainable procurement for construction work. International Journal of Construction Management, 23(13), pp. 2221-2229. ISSN 1562-3599
Messi, Leonardo (2022) Development of a BIM-based simulator for workspace management in construction. PhD thesis, Università Politecnica delle Marche, Italy.
Metawa, K O (1987) The transfer of construction management technology to developing countries - Libya as a case study. PhD thesis, University of Manchester, UK.
Milani, B (2005) Building materials in a green economy: Community-based strategies for dematerialization. PhD thesis, University of Toronto, Canada.
Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451
Miller, D P (2009) Essays on subcontracting, competitive bidding, and dynamic housing demand. PhD thesis, University of Minnesota, USA.
Mills, A; Love, P E D and Williams, P (2009) Defect costs in residential construction. Journal of Construction Engineering and Management, 135(1), pp. 12-16. ISSN 0733-9364
Mills, A; Smith, J and Love, P (2002) Barriers to the development of SMEs in the Australian construction industry. Construction Economics and Building, 2(2), pp. 71-79. ISSN 2204-9029
Mills, Anthony John (2002) Client and contractor attitudes to prequalification and selection processes for construction work. PhD thesis, University of Melbourne, Australia.
Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.
Min, J U (2004) Supply chain visualization through web services integration. PhD thesis, Stanford University, USA.
Minchin, R E; Thurn, S B; Ellis, R D and Lewis, D W (2013) Using contractor bid amounts to estimate the impact of night construction on cost for transportation construction. Journal of Construction Engineering and Management, 139(8), pp. 1055-1062. ISSN 0733-9364
Mirza, M B; Malik, S; Afzal, N and Ali Kazmi, S J (2025) Examining the impact of conflict resolution, emotional intelligence on project team performance: A study in the construction industry of Pakistan. International Journal of Construction Management, 25(16), pp. 2030-2040. ISSN 1562-3599
Mirzaee, A M and Martek, I (2025) Improving project management "closeout" phase outcomes: Evidence from a large general contractor in Iran using "x-inefficiency theory". Engineering, Construction and Architectural Management, 32(8), pp. 5253-5271. ISSN 0969-9988
Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings. PhD thesis, Heriot-Watt University, UK.
Mitropoulos, P and Cupido, G (2009) Safety as an emergent property: Investigation into the work practices of high-reliability framing crews. Journal of Construction Engineering and Management, 135(5), pp. 407-415. ISSN 0733-9364
Mitropoulos, P and Memarian, B (2012) Team processes and safety of workers: Cognitive, affective, and behavioral processes of construction crews. Journal of Construction Engineering and Management, 138(10), pp. 1181-1191. ISSN 0733-9364
Mitropoulos, P and Memarian, B (2013) Task demands in masonry work: Sources, performance implications, and management strategies. Journal of Construction Engineering and Management, 139(5), pp. 581-590. ISSN 0733-9364
Mkandawire, K; Kabiri, S; Mbugua, L and Connaughton, J (2022) Managing interfaces between offsite and onsite construction. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Mlitwa, N B W and Birch, D (2011) The role of intrusion detection systems in electronic information security: From the activity theory perspective. Journal of Engineering, Design and Technology, 9(3), pp. 296-312. ISSN 1726-0531
Mmereki, D and Brouwer, D (2022) Application of innovative materials and methods in green buildings and associated occupational exposure and health of construction workers: A systematic literature review. Journal of Construction Engineering and Management, 148(8): 04022068, ISSN 0733-9364
Mohamed, M (2022) A risk-based model for construction inspection in highways. PhD thesis, University of Kansas, USA.
Mohamed, S F (2006) Improving construction site management practices through knowledge management. PhD thesis, Loughborough University, UK.
Mohamed, Y (2002) A framework for systematic improvement of construction systems. PhD thesis, University of Alberta, Canada.
Mohammad Ahmad, A; Rodriguez Trejo, S; Hafeez, M A; Dawood, N; Kassem, M and Naji, K K (2023) Drivers for energy analysis towards a BIM-enabled information flow. Smart and Sustainable Built Environment, 12(3), pp. 507-533. ISSN 2046-6099
Mohammadi, P; Asgari, S; Rashidi, A and Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6): 04025052, ISSN 0733-9364
Mohammadpour, A (2014) Retrofitting healthcare facilities to enhance patient safety and energy efficiency. PhD thesis, Pennsylvania State University, USA.
Mohammed, Miswan Abdul Hakim (1994) An investigation into firms' strategies and their financial performance in the UK construction industry. PhD thesis, University College London, UK.
Mohd Zainudin, N (2019) Identification and analysis of worker safety hazards in Midwest agribusiness construction work sites. Unpublished PhD thesis, Iowa State University, USA.
Moir, S (2004) Worker participation in OHS change in the construction workplace. ScD thesis, University of Massachusetts Lowell, USA.
Mojahed, S (2005) A project improvement system for effective management of construction projects. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Mollaei, A; Bachmann, C and Haas, C (2025) Evaluating the potential impact of building design strategies on material recovery during deconstruction. Journal of Construction Engineering and Management, 151(6): 04025065, ISSN 0733-9364
Monahan, J (2013) Housing and carbon reduction: can mainstream 'eco-housing' deliver on its low carbon promises? PhD thesis, University of East Anglia, UK.
Mondragon Solis, Fernando Alberto (2013) Jobsite information processing: Cognitive analysis of construction field managers and applications. PhD thesis, University of Texas at Austin, USA.
Montalbán-Domingo, L; Torres-Machi, C; Sanz-Benlloch, A; Pellicer, E and Molenaar, K R (2023) Green public procurement in civil infrastructure construction: Current performance and main project characteristics. Journal of Construction Engineering and Management, 149(9): 04023089, ISSN 0733-9364
Moon, S; Xu, S; Hou, L; Wu, C; Wang, X and Tam, V W Y (2018) RFID-aided tracking system to improve work efficiency of scaffold supplier: Stock management in Australasian supply chain. Journal of Construction Engineering and Management, 144(2): 04017115, ISSN 0733-9364
Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.
Moore, D R; Paterson, G and Martinez, R S (2004) Sustainable communities: A proposal linking the management of forestation and agricultural waste with the development of recyclable housing. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Moore, H (2013) Exploring information generation and propagation from the point of installation on construction jobsites: An sna/abm hybrid approach. PhD thesis, Michigan State University, USA.
Morbitzer, C A (2003) Towards the integration of simulation into the building design process. PhD thesis, University of Strathclyde, UK.
Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Morrow, S (2012) Balancing a safer and healthier frame to designing: A grounded theory. PhD thesis, Glasgow Caledonian University, UK.
Mortimer, A; Egbelakin, T and Sher, W (2023) Making the case for policy interventions in disaster governance and management in Australia to better support internally displaced people. International Journal of Disaster Resilience in the Built Environment, 14(4), pp. 471-494. ISSN 1759-5916
Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364
Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175
Moshtaghian, F; Golabchi, M and Noorzai, E (2020) A framework to dynamic identification of project risks. Smart and Sustainable Built Environment, 9(4), pp. 375-393. ISSN 2046-6099
Mostafa, S; Chileshe, N and Zuo, J (2014) A synergistic supply chain enhancing offsite manufacturing uptake in Australian house building. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Mostofi, F; Tokdemir, O B; Toǧan, V and Arditi, D (2024) Predicting the cost of rework in high-rise buildings using graph convolutional networks. Journal of Construction Engineering and Management, 150(8): 04024085, ISSN 0733-9364
Mourgues, C (2009) Method to produce field instructions from product and process models. PhD thesis, Stanford University, USA.
Moussavi, S (2023) Integration of environmental sustainability and decision making: Case studies of civil infrastructure. PhD thesis, University of Nebraska - Lincoln, USA.
Moussourakis, J and Haksever, C (2004) Flexible model for time/cost tradeoff problem. Journal of Construction Engineering and Management, 130(3), pp. 307-314. ISSN 0733-9364
Moza, A and Paul, V K (2019) Analysis of claims in public works construction contracts in India. Journal of Construction in Developing Countries, 23(2), pp. 7-26. ISSN 1823-6499
Muehlhausen, F B (1988) Development of the materials management model for construction management curriculum development and a method to translate model information into instruction. PhD thesis, Purdue University, USA.
Mujumdar, P (2017) Modeling design interdependency and iteration for multiple two-way information exchanges in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Mukherjee, A (2005) A multi-agent framework for general purpose situational simulations in construction management. PhD thesis, University of Washington, USA.
Mukwanason, D E; Tutesigensi, A; Kayondo, M and Mutikanga, H E (2023) Impact of project quality culture on defects in infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Mulowayi, E; Coffey, V; Bunker, J and Trigunarsiah, B (2015) The influence of critical infrastructure interdependencies on post-disaster reconstruction: Elements of infrastructure interdependency that impede the post-disaster recovery effort. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Munaro, M R and Tavares, S F (2025) Design for adaptability and disassembly: Guidelines for building deconstruction. Construction Innovation, 25(2), pp. 665-687. ISSN 1471-4175
Murguia, D; Rathnayake, A; Jansen Van Vuuren, T and Middleton, C (2024) Measuring construction productivity across projects: Multilevel three-dimensional framework. Journal of Construction Engineering and Management, 150(11): 04024151, ISSN 0733-9364
Murnane, R; Simpson, A and Jongman, B (2016) Understanding risk: What makes a risk assessment successful? International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 186-200. ISSN 1759-5916
Murphy, M; Heaney, G and Perera, S (2011) A methodology for evaluating construction innovation constraints through project stakeholder competencies and FMEA. Construction Innovation, 11(4), pp. 416-440. ISSN 1471-4175
Mushtaq, K A B; Hassan, M U; Ahmad, T and Choudhry, R M (2026) Impact of BIM on quality of planning and design in highway infrastructure projects: SEM-based inquiry. Journal of Construction Engineering and Management, 152(2): 04025262, ISSN 0733-9364
Muya, M (1999) A systematic approach for improving construction materials logistics. PhD thesis, Loughborough University, UK.
Muya, M; Price, A D F and Thorpe, A (1997) Construction materials supply logistics. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.
Myers, H; Wade, F and Webb, J (2019) Mapping emerging subcontracting networks for the energy efficiency retrofit of hard-to-treat buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Myrvang, R and Liu, C Y A (2025) Beyond traditional methods: Enhancing cost escalation forecasting in commercial construction amid economic turbulence. Journal of Construction Engineering and Management, 151(2): 04024201, ISSN 0733-9364
Mäki, T and Kerosuo, H (2015) Site managers' daily work and the uses of building information modelling in construction site management. Construction Management and Economics, 33(3), pp. 163-175. ISSN 01446193
Na, L J; Ofori, G and Park, M (2006) Stimulating construction innovation in Singapore through the national system of innovation. Journal of Construction Engineering and Management, 132(10), pp. 1069-1082. ISSN 0733-9364
Na, R (2013) Property rights analysis of building material pricing. PhD thesis, University of Hong Kong, Hong Kong.
Naar, L; Nikolova, N and Forsythe, P (2016) Innovative construction and the role of boundary objects: A Gehry case study. Construction Management and Economics, 34(10), pp. 688-699. ISSN 01446193
Nadi, E (2019) Construction labor productivity benchmarking: A comparison between on-site construction and prefabrication. PhD thesis, Marquette University, USA.
Naim, A A A A (2018) An investigation of building information modelling implementation in KSA. PhD thesis, University of Wolverhampton, UK.
Naji, K K; Gunduz, M and Hamaidi, M F (2022) Major factors affecting construction waste management in infrastructure projects using structural equation model. Journal of Construction Engineering and Management, 148(10): 04022101, ISSN 0733-9364
Nakanishi, H; Black, J and Matsuo, K (2014) Disaster resilience in transportation: Japan earthquake and tsunami 2011. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 341-361. ISSN 1759-5916
Nam, C H and Tatum, C B (1988) Major characteristics of constructed products and resulting limitations of construction technology. Construction Management and Economics, 6(2), pp. 133-147. ISSN 01446193
Namian, M; Taherpour, F; Ghiasvand, E and Turkan, Y (2021) Insidious safety threat of fatigue: Investigating construction workers' risk of accident due to fatigue. Journal of Construction Engineering and Management, 147(12): 2180, ISSN 0733-9364
Nanayakkara, L (1999) An interpretive research methodology for assessing the appicability of western productivity techniques in Sri Lanka. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Nanayakkara, L (2012) Site layout: how it is perceived to affect productivity in public sector construction projects in Sri Lanka. PhD thesis, Oxford Brookes University, UK.
Naoum, S and Hackman, J O N (1996) Do site managers and the head office perceive productivity factors differently? Engineering, Construction and Architectural Management, 3(1-2), pp. 147-160. ISSN 0969-9988
Nasir, H; Ahmed, H; Haas, C and Goodrum, P M (2014) An analysis of construction productivity differences between Canada and the United States. Construction Management and Economics, 32(6), pp. 595-607. ISSN 01446193
Nath, N D (2021) Human-centered computing and visual analytics for future of work in construction. PhD thesis, Texas A&M University, USA.
Nath, T; Attarzadeh, M and Tiong, R L K (2016) Precast workflow productivity measurement through BIM adoption. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 208-216. ISSN 17514304
Naveed, F and Khan, K I A (2022) Investigating the influence of information complexity on construction quality: A systems thinking approach. Engineering, Construction and Architectural Management, 29(3), pp. 1427-1448. ISSN 0969-9988
Navon, R and Berkovich, O (2005) Development and on-site evaluation of an automated materials management and control model. Journal of Construction Engineering and Management, 131(12), pp. 1328-1336. ISSN 0733-9364
Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X
Nayfeh, M (1989) A combination of cyclone and vert techniques for the management of construction projects. PhD thesis, Aston University, UK.
Neeraj, S; Mannakkara, S and Wilkinson, S (2020) Build back better concepts for resilient recovery: A case study of India's 2018 flood recovery. International Journal of Disaster Resilience in the Built Environment, 12(3), pp. 280-294. ISSN 1759-5916
Nelson, T N T (2024) Using socio-technical water systems in construction engineering to address water insecurity after hurricanes maria and fiona. PhD thesis, Iowa State University, USA.
Neshat, N (2013) Conceptualization, measurement and empirical exploration of selected supply chain risk constructs. DSc thesis, ETH Zürich, Switzerland.
Netto, A M (2001) Third party rights for latent defects in buildings. PhD thesis, King's College London, UK.
Neuman, Y; Alves, T D C L; Walsh, K D and Needy, K L (2015) Quantitative analysis of supplier quality surveillance practices in EPC projects. Journal of Construction Engineering and Management, 141(11): 04015039, ISSN 0733-9364
Ng, A K W and Price, A D F (2005) Assessing the impact of main contractor's site co-ordination on sub-contractors' performance in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ng, A K W and Price, A D F (2010) Optimizing the time performance of subcontractors in building projects. Construction Economics and Building, 10(1-2), pp. 90-102. ISSN 2204-9029
Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Ng, S T; Fan, R Y C; Wong, J M W; Chan, A P C; Chiang, Y H; Lam, P T I and Kumaraswamy, M (2009) Coping with structural change in construction: Experiences gained from advanced economies. Construction Management and Economics, 27(2), pp. 165-180. ISSN 1466433X
Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity a case of structural work. Engineering, Construction and Architectural Management, 20(6), pp. 563-575. ISSN 0969-9988
Nguyen, L D; Nguyen, T K N; Tran, D Q and Villiers, C (2014) Productivity in daytime and nighttime construction of urban sewer systems. Journal of Construction Engineering and Management, 140(7): 04014021, ISSN 0733-9364
Nguyen, T; Nguyen, L H; Chileshe, N and Hallo, L (2023) Investigating critical risk factors of selecting joint venture contractors for infrastructure projects implementation in Vietnam. International Journal of Construction Management, 23(14), pp. 2438-2451. ISSN 1562-3599
Nicholas, J (2000) A risk analysis system for evaluating construction contractors by potential creditors. PhD thesis, University of Wolverhampton, UK.
Nicholls, C and Murdoch, I J (2003) Construction industry capacity utilization and its implications. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Nicol, L A and Knoepfel, P (2014) Resilient housing: A new resource-oriented approach. Building Research & Information, 42(2), pp. 229-239. ISSN 0961-3218
Nicolini, D (2007) Studying visual practices in construction. Building Research & Information, 35(5), pp. 576-580. ISSN 0961-3218
Nie, P; Dahanayake, K C and Sumanarathna, N (2024) Exploring uae's transition towards circular economy through construction and demolition waste management in the pre-construction stage–a case study approach. Smart and Sustainable Built Environment, 13(2), pp. 246-266. ISSN 2046-6099
Niskanen, T (1993) Accident risks and preventive measures in materials handling at construction sites. DrTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Noghabaei, M (2021) Visual and behavioral data analysis in immersive virtual environments for enhancing construction safety, planning, and control. PhD thesis, North Carolina State University, USA.
Norton, M and Lane, A (2012) 'New water architecture': An integrated water management model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(3), pp. 159-171. ISSN 17514312
Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.
Notman, D; Norman, G; Flanagan, R and Agapiou, A (1998) A time-series analysis of UK annual and quarterly construction output data (1955-95). Construction Management and Economics, 16(4), pp. 409-416. ISSN 01446193
Nour, H A (2003) An information approach for enhancing the health and safety file. PhD thesis, University of Manchester, UK.
Novotny, V (2013) Water-energy nexus: Retrofitting urban areas to achieve zero pollution. Building Research & Information, 41(5), pp. 589-604. ISSN 0961-3218
Nwankwo, D C (2023) Improving approaches to material inventory management in construction industry in the UK. DBA thesis, University of Wales Trinity Saint David, UK.
Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality. DPhil thesis, University of Johannesburg, South Africa.
Ní Fhloinn, D (2017) Liability in negligence for building defects in Ireland, England and Australia: Where statute speaks, must common law be silent? International Journal of Law in the Built Environment, 9(3), pp. 178-192. ISSN 1756-1450
O'Connor, J T (1983) Improving industrial project constructability (productivity, value engineering). PhD thesis, University of Texas at Austin, USA.
O'Connor, J T and Tucker, R L (1986) Industrial project constructability improvement. Journal of Construction Engineering and Management, 112(1), pp. 69-82. ISSN 0733-9364
Obiozo, R N (2018) The role of psychosocial recuperative therapy in enhancing construction performance on projects. PhD thesis, Nelson Mandela University, South Africa.
Obiozo, R N and Smallwood, J J (2015) Biophilic construction site model: Enhancing the motivational and humanistic value of the green construction site. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.
Odeh, I; El-Rayes, K and Liu, L (2009) Field experiments to evaluate and control light tower glare in nighttime work zones. Journal of Construction Engineering and Management, 135(9), pp. 911-919. ISSN 0733-9364
Odeyinka, H A (2000) An evaluation of the use of insurance in managing construction risks. Construction Management and Economics, 18(5), pp. 519-524. ISSN 01446193
Oduori, M and Mbuya, T (2009) Wire rope selection for manual winch application. Journal of Engineering, Design and Technology, 7(2), pp. 207-222. ISSN 1726-0531
Ofori, G; Zhang, Z and Ling, F Y Y (2021) Initiatives that enable Singapore contractors to improve construction productivity. Built Environment Project and Asset Management, 11(5), pp. 785-803. ISSN 2044-124X
Ofori, G; Zhang, Z and Ling, F Y Y (2022) Key barriers to increase construction productivity: The Singapore case. International Journal of Construction Management, 22(14), pp. 2635-2646. ISSN 1562-3599
Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.
Ogunmakinde, O E; Egbelakin, T and Henderson, R (2023) Evaluation of animal safe places for emergency evacuation in the hunter region of New South Wales, Australia. International Journal of Disaster Resilience in the Built Environment, 14(4), pp. 553-576. ISSN 1759-5916
Ogunseiju, O; Olayiwola, J; Akanmu, A and Olatunji, O A (2022) Evaluation of postural-assist exoskeleton for manual material handling. Engineering, Construction and Architectural Management, 29(3), pp. 1358-1375. ISSN 0969-9988
Ogunseiju, O R; Olayiwola, J; Akanmu, A A and Nnaji, C (2022) Recognition of workers' actions from time-series signal images using deep convolutional neural network. Smart and Sustainable Built Environment, 11(4), pp. 812-831. ISSN 2046-6099
Ogunseiju, Omobolanle Ruth (2022) Impact of interactive holographic learning environment for bridging technical skill gaps of future smart construction engineering and management students. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Ojiako, U; Park, J H; Williams, T; Marshall, A and Chipulu, M (2014) What is best value in public sector building construction? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 209-219. ISSN 17514304
Ojolo, S J; Damisa, O; Orisaleye, J I and Ogbonnaya, C (2010) Design and development of cashew nut shelling machine. Journal of Engineering, Design and Technology, 8(2), pp. 146-157. ISSN 1726-0531
Ok, S C and Sinha, S K (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), pp. 1029-1044. ISSN 1466433X
Oke, A E; Aliu, J; Oyediran, A O and Ukaha Onyeukwu, S (2025) Evaluating social media in architecture, engineering, construction and operation industry: A Nigerian perspective on applications and benefits. International Journal of Building Pathology and Adaptation, 43(7), pp. 1725-1740. ISSN 2398-4708
Oke, A. E.; Aliu, J.; Ukaha Onyeukwu, S.; Jamir Singh, P. S.; Azura Ramli, R. and Shaharudin Samsurijan, M. (2026) An empirical study on the implications of social media for sustainable construction and productivity in Lagos state, Nigeria. Construction Innovation, 26(3), pp. 720-744. ISSN 1471-4175
Oke, A E; Aliu, J; Ifedolapo Babalola, H; Jamir Singh, P S; Tunji-Olayeni, P and Ukaha Onyeukwu, S (2025) From building blocks to digital networks: Analyzing critical drivers for social media adoption in the construction sector. International Journal of Construction Management, 25(9), pp. 1047-1057. ISSN 1562-3599
Oke, A E and Arowoiya, V A (2022) An analysis of the application areas of augmented reality technology in the construction industry. Smart and Sustainable Built Environment, 11(4), pp. 1081-1098. ISSN 2046-6099
Oke, A E; Arowoiya, V A and Akomolafe, O T (2022) Influence of the internet of things' application on construction project performance. International Journal of Construction Management, 22(13), pp. 2517-2527. ISSN 1562-3599
Oke, A E; Kineber, A F; Al-Bukhari, I; Famakin, I and Kingsley, C (2023) Exploring the benefits of cloud computing for sustainable construction in Nigeria. Journal of Engineering, Design and Technology, 21(4), pp. 973-990. ISSN 1726-0531
Oke, A E; Ogunsemi, D R and Adeyelu, M (2019) Quadrant and gap analysis of required and exhibited quantity surveyors’ competencies. Journal of Engineering, Design and Technology, 17(6), pp. 1161-1173. ISSN 1726-0531
Okika, Michael Chuba (2023) Risk analysis framework to minimise risks in construction projects. PhD thesis, University of Johannesburg, South Africa.
Okunola, A; Akanmu, A A and Yusuf, A O (2025) Comparison of active and passive back-support exoskeletons for construction work: Range of motion, discomfort, usability, exertion and cognitive load assessments. Smart and Sustainable Built Environment, 14(3), pp. 582-598. ISSN 2046-6099
Oladejo, J (2020) An investigation in the factors affecting the implementation of health and safety management practices by contractors in Nigeria. PhD thesis, University of the West of England, Bristol, UK.
Olanrewaju, A A L (2012) Quantitative analysis of defects in university buildings: User perspective. Built Environment Project and Asset Management, 2(2), pp. 167-181. ISSN 2044-124X
Olatunbosun, S; Odediran, S; Ekundayo, D and Aigbavboa, C (2024) Factors inhibiting energy access in the delivery of construction projects in Lagos metropolis, Nigeria. International Journal of Construction Management, 24(11), pp. 1215-1224. ISSN 1562-3599
Olatunji, O A; Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project's outturn costs. Built Environment Project and Asset Management, 8(4), pp. 358-371. ISSN 2044-124X
Olayiwola, J; Yusuf, A O; Akanmu, A A; Murzi, H; Gao, X and Afsari, K (2025) Construction practice knowledge for complementing classroom teaching during site visits. Smart and Sustainable Built Environment, 14(1), pp. 119-139. ISSN 2046-6099
Olbina, S (2008) Improving the delivery system for teaching the project planning and feasibility/site development course to building construction undergraduate students and real estate graduate students. International Journal of Construction Education and Research, 4(1), pp. 46-64. ISSN 1557-8771
Olimat, H.; Abudayyeh, O.; Liu, H. and Alwashah, Z. (2026) Safety performance evaluation model for off-site construction through the integration of key leading and lagging factors. Journal of Construction Engineering and Management, 152(6): 04026077, ISSN 0733-9364
Olomolaiye, P O and Ogunlana, S O (1989) A system for monitoring and improving construction operative productivity in Nigeria. Construction Management and Economics, 7(2), pp. 175-186. ISSN 01446193
Olubajo, O O and Daniel, E I (2024) Understanding a worker recruitment as a practice of informality in construction work packages. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Olubodun, O F (1996) An empirical approach to the evaluation of factors in local authority housing maintenance requirements in the City of Manchester. PhD thesis, University of Salford, UK.
Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.
Omotayo, T S (2017) Strategic realignment of the post-contract cost control process in the Nigerian construction industry using kaizen. PhD thesis, University of Salford, UK.
Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.
Onososen, A and Musonda, I (2024) VR-based training methods in enhancing communication within human-robot teams in construction. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Onubi, H O; Yusof, N and Hassan, A S (2020) Effects of green construction on project's economic performance. Journal of Financial Management of Property and Construction, 25(3), pp. 331-346. ISSN 1366-4387
Onubi, H O; Yusof, N A and Hassan, A S (2019) Green site practices and environmental performance: How project complexity moderates the relationship. Construction Economics and Building, 19(1), pp. 75-95. ISSN 2204-9029
Onwuegbuchulam, G; Cheung, C M; Yeow, J and Manu, P (2024) Exploring the interplay of job-related and personal factors in the well-being of construction project professionals: A conceptual framework. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Onyia, U (2019) Improving the supervisory and managerial skills and competences required in construction management in Nigeria. PhD thesis, London South Bank University, UK.
Oo, B L and Lim, B T H (2025) Working from home during the COVID-19 pandemic and gender differences: A case of construction workforce in Australia. Engineering, Construction and Architectural Management, 32(7), pp. 4439-4457. ISSN 0969-9988
Oo, B-L and Drew, D S (2008) Adapting building design to access by individuals with intellectual disability. Construction Economics and Building, 8(1), pp. 11-22. ISSN 2204-9029
Opdyke, A.; Latiph, A. A.; Shrief, M. C. and Yape, E. (2026) Displacement, infrastructure deficits and public health risks in post-conflict marawi during the COVID-19 pandemic. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 297-313. ISSN 1759-5908
Opdyke, A (2017) Resilient and sustainable infrastructure systems: A comparative analysis of post-disaster shelter coordination, stakeholder participation, and training. PhD thesis, University of Colorado at Boulder, USA.
Opdyke, A; Lepropre, F; Javernick-Will, A and Koschmann, M (2017) Inter-organizational resource coordination in post-disaster infrastructure recovery. Construction Management and Economics, 35(8-9), pp. 514-530. ISSN 01446193
Orabi, W and El-Rayes, K (2012) Optimizing the rehabilitation efforts of aging transportation networks. Journal of Construction Engineering and Management, 138(4), pp. 529-539. ISSN 0733-9364
Orabi, W; El-Rayes, K; Senouci, A B and Al-Derham, H (2009) Optimizing postdisaster reconstruction planning for damaged transportation networks. Journal of Construction Engineering and Management, 135(10), pp. 1039-1048. ISSN 0733-9364
Orstavik, F and Dainty, A (2016) On the doing of building work. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Osei-Kyei, R; Almeida, L M; Ampratwum, G and Tam, V (2023) Systematic review of critical infrastructure resilience indicators. Construction Innovation, 23(5), pp. 1210-1231. ISSN 1471-4175
Osei-Tutu, S; Ayarkwa, J; Nani, G; Osei-Asibey, D and Abu, I M A (2025) Stakeholders' role towards circular economy implementation: A scientometric review. Construction Innovation, 25(6), pp. 1633-1656. ISSN 1471-4175
Oshodi, O; Edwards, D J; lam, K C; Olanipekun, A O and Aigbavboa, C O (2020) Construction output modelling: a systematic review. Engineering, Construction and Architectural Management, 27(10), pp. 2959-2991. ISSN 0969-9988
Osman, I I (2002) Performance measures for contracting companies: a study of the Arab Contractors Company. PhD thesis, Loughborough University, UK.
Osmani, M (2015) Integration of waste minimisation strategies into the design process of buildings. PhD thesis, Loughborough University, UK.
Osunsanmi, T O; Aigbavboa, C O; Thwala, W D D and Molusiwa, R (2022) Modelling construction 4.0 as a vaccine for ensuring construction supply chain resilience amid COVID-19 pandemic. Journal of Engineering, Design and Technology, 20(1), pp. 132-158. ISSN 1726-0531
Otegbulu, A C (2011) A contingent valuation model for assessing electricity demand. Journal of Financial Management of Property and Construction, 16(2), pp. 126-146. ISSN 1366-4387
Oteifa, S A (1991) An investigation into civil engineering estimators' decision making and expertise. PhD thesis, Loughborough University, UK.
Othman, A A; Rahman, S A; Sundram, V P K and Bhatti, M A (2015) Modelling marketing resources, procurement process coordination and firm performance in the Malaysian building construction industry. Engineering, Construction and Architectural Management, 22(6), pp. 644-668. ISSN 0969-9988
Othman, A A E and Hussein, R M (2024) Innovation management framework for achieving sustainability through managing risks of innovative solutions during the design process. Journal of Engineering, Design and Technology, 22(6), pp. 1870-1893. ISSN 1726-0531
Othman, A A E and Kamal, A R (2024) A framework for enhancing building maintainability through facilitating early suppliers' involvement in the design process. Journal of Engineering, Design and Technology, 22(4), pp. 1231-1256. ISSN 1726-0531
Ou, C-S (2007) Sustainable infrastructure materials: A life cycle assessment approach. PhD thesis, University of Colorado at Boulder, USA.
Oviedo Haito, Ricardo Juan José (2015) Strategies to develop specialist trade contractors. PhD thesis, Universidade de São Paulo, Brazil.
Owers, R and Weber, S L (1997) Strategic plan for southwest Indian community's construction business. Journal of Construction Engineering and Management, 123(3), pp. 331-337. ISSN 0733-9364
Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study. PhD thesis, University of Maryland, College Park, USA.
Oyegoke, A S; McDermott, P; Aouad, G and Cleary, M (2009) Skill competency development strategies by a contractor. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(3), pp. 121-130. ISSN 17514312
Oyewobi, L O; Abiola-Falemu, O and Ibironke, O T (2016) The impact of rework and organisational culture on project delivery. Journal of Engineering, Design and Technology, 14(2), pp. 214-237.
O’Connor, J T; Hugo, F and Stamm, E M (1991) Improving highway specifications for constructibility. Journal of Construction Engineering and Management, 117(2), pp. 242-258. ISSN 0733-9364
Paap, K (1999) Masculinity under construction: Gender, class, and race in the construction industry. PhD thesis, University of Wisconsin - Madison, USA.
Pablo, Z and London, K A (2020) Stable relationality and dynamic innovation: Two models of collaboration in SME-driven offsite manufacturing supply chains in housing construction. Engineering, Construction and Architectural Management, 27(7), pp. 1553-1577. ISSN 0969-9988
Paidakaki, A. (2026) Creating resilient cities: Advocacy and planning for equity-based recovery. Buildings & Cities, 7(1), pp. 597-613. ISSN 2632-6655
Paidakaki, A and Moulaert, F (2017) Does the post-disaster resilient city really exist? A critical analysis of the heterogeneous transformative capacities of housing reconstruction "resilience cells". International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 275-291. ISSN 1759-5916
Painting, N J; Piroozfar, P A E and Farr, E R P (2014) Refurbishment of higher education premises: Stakeholder engagement in the process and product. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Palaneeswaran, E; Kumaraswamy, M and Ng, T (2003) Targeting optimum value in public sector projects through "best value"-focused contractor selection. Engineering, Construction and Architectural Management, 10(6), pp. 418-431. ISSN 0969-9988
Palaneeswaran, E; Love, P E D; Kumaraswamy, M M and Ng, T S T (2008) Mapping rework causes and effects using artificial neural networks. Building Research & Information, 36(5), pp. 450-465. ISSN 0961-3218
Palaniappan, S (2009) Environmental performance of on-site construction processes in post-tensioned slab foundation construction: A study of production home building in the Greater Phoenix area. PhD thesis, Arizona State University, USA.
Pallyyaguru, Roshani Sandika (2010) Influence of integrating disaster risk reduction within post-disaster infrastructure reconstruction on socio-economic development. PhD thesis, University of Salford, UK.
Pan, L-J (1996) A study of risk management in dealing with contracts in the construction industry. PhD thesis, University of Glasgow, UK.
Panas, A and Pantouvakis, J P (2018) On the use of learning curves for the estimation of construction productivity. International Journal of Construction Management, 18(4), pp. 301-309. ISSN 1562-3599
Pararajasingam, R; Waidyasekara, A S and Victar, H C (2026) Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka. Construction Innovation, 26(1), pp. 22-43. ISSN 1471-4175
Parchami Jalal, M and Shoar, S (2019) A hybrid framework to model factors affecting construction labour productivity: Case study of Iran. Journal of Financial Management of Property and Construction, 24(3), pp. 630-654. ISSN 1366-4387
Parikka-Alhola, K and Nissinen, A (2012) Environmental impacts of transport as award criteria in public road construction procurement. International Journal of Construction Management, 12(2), pp. 35-49. ISSN 1562-3599
Park, H S; Thomas, S R and Tucker, R L (2005) Benchmarking of construction productivity. Journal of Construction Engineering and Management, 131(7), pp. 772-778. ISSN 0733-9364
Park, H-S (2002) Development of a construction productivity metrics system (CPMS). PhD thesis, University of Texas at Austin, USA.
Park, M (2001) Dynamic planning and control methodology for large-scale concurrent construction projects. PhD thesis, Massachusetts Institute of Technology, USA.
Park, Y C (1993) Korea's overseas construction work and its impact on the Korean economy 1965-1984. PhD thesis, University of Hull, UK.
Parrish, K D (2009) Applying a set-based design approach to reinforcing steel design. PhD thesis, University of California, Berkeley, USA.
Pasquire, C (2012) Positioning lean within an exploration of engineering construction. Construction Management and Economics, 30(8), pp. 673-685. ISSN 1466433X
Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.
Patel, D A and Jha, K N (2016) An estimate of fatal accidents in Indian construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Patel, S and Hastak, M (2013) A framework to construct post-disaster housing. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 95-114. ISSN 1759-5916
Patil, K; Ayer, S K; Bhandari, S; Hallowell, M R and Perry, L A (2025) Bringing reality to virtual reality: The role of environmental richness in improving construction practitioners' VR experience. Construction Innovation, 25(7), pp. 358-383. ISSN 1471-4175
Patlakas, P; Musso, M and Larkham, P (2022) A digital curation model for post-occupancy evaluation data. Architectural Engineering and Design Management, 18(2), pp. 128-148. ISSN 1745-2007
Paulson, B C (1985) Automation and robotics for construction. Journal of Construction Engineering and Management, 111(3), pp. 190-207. ISSN 0733-9364
Peacock, W S (1990) Site investigation procedures and risk analysis. PhD thesis, University of Manchester, UK.
Peng, J and Zhang, Q (2025) Construction group conflict under resource overlap: A game theory approach. Engineering, Construction and Architectural Management, 32(1), pp. 156-171. ISSN 0969-9988
Penteado Filho, P D A (1984) Productivity trends in the construction industry. PhD thesis, Cornell University, USA.
Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.
Pereira, Ana Paula Carvalho (2017) Building information modeling in the project phase: A proposal for a BIM execution plan for SUMAI / UFBA. PhD thesis, Universidade Federal da Bahia, Brazil.
Perera, B A K S; Sirimewan, D C and Senadeera, A D (2021) Management of variations in the public-sector building construction projects in Sri Lanka. Journal of Engineering, Design and Technology, 19(6), pp. 1601-1619. ISSN 1726-0531
Perera, Weebadda Arachchilage Salinda (2018) An investigation into developing productive construction environments to improve quality performance in Australian building construction. PhD thesis, University of New South Wales, Australia.
Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.
Peter, E; Love, D and Heng, L I (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(4), pp. 479-490. ISSN 01446193
Petlíková, K (2021) Application of biological algorithms in standardization of construction work. PhD thesis, Czech Technical University, Czech Republic.
Petroutsatou, K and Giannoulis, P (2022) Analysis of construction machinery market: The case of Greece. International Journal of Construction Management, 22(9), pp. 1667-1674. ISSN 1562-3599
Pham, S V H and Nguyen, K V T (2025) Performance review of RTI IMS software for automatic road surface damages identification. International Journal of Construction Management, 25(4), pp. 439-455. ISSN 1562-3599
Pheng, L S and Tan, S K L (1998) How 'just-in-time' wastages can be quantified: Case study of a private condominium project. Construction Management and Economics, 16(6), pp. 621-635. ISSN 01446193
Phillips, R E (2020) Occupant centric dynamic modeling of sustainability analyses in buildings. PhD thesis, Northeastern University, USA.
Pieper, P J (1984) The measurement of real investment in structures and the construction productivity decline (deflation). PhD thesis, Northwestern University, USA.
Pietroforte, R and Gregori, T (2006) Does volume follow share? The case of the Danish construction industry. Construction Management and Economics, 24(7), pp. 711-715. ISSN 1466433X
Pihl, D; Forman, M; Frandsen, A K; Nielsen, A K B and Primdahl, M B (2022) Digital infrastructures of facilities management: How data systems and work environments affect each other. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Pink, S.; De Silva, N.; Lyall, B. and Korsmeyer, H. (2026) Sustainable digital construction work futures. Construction Management and Economics, 44(7), pp. 518-536. ISSN 0144-6193
Pirzadeh, P and Lingard, H (2017) Exploring the dynamic social interactions that underpin work health and safety related design decision-making. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Pishdad-Bozorgi, P (2017) Case studies on the role of integrated project delivery approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2), pp. 102-23. ISSN 1557-8771
Pittri, H; Agyekum, K; Botchway, E A; Alencastro, J; Oladinrin, O T and Dompey, A M A (2024) Drivers for design for deconstruction (DfD) implementation among design professionals. Smart and Sustainable Built Environment, 13(5), pp. 1134-1154. ISSN 2046-6099
Plemmons, J K (1995) Materials management process measures and benchmarking in the industrial construction industry. PhD thesis, Clemson University, USA.
Pokharel, S (2023) Providing project management knowledge and skills through scaffolding and project-based learning strategy. Journal of Engineering, Design and Technology, 21(4), pp. 1153-1172. ISSN 1726-0531
Polat, G (2009) Simulation-based efficiency assessment approach for rebar supply chains in Turkey. Construction Innovation, 9(1), pp. 101-121. ISSN 1471-4175
Polat, G and Arditi, D (2005) The JIT materials management system in developing countries. Construction Management and Economics, 23(7), pp. 697-712. ISSN 01446193
Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364
Pomares, J C; Irles, R; Segovia, E and Ferrer, B (2014) Acceleration and deflection analysis for class C edge protection systems in construction work. Journal of Construction Engineering and Management, 140(8): 04014031, ISSN 0733-9364
Poon, C S; Yu, A T W; See, S C and Cheung, E (2004) Minimizing demolition wastes in Hong Kong public housing projects. Construction Management and Economics, 22(8), pp. 799-805. ISSN 01446193
Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.
Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.
Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364
Porteous, C D A; Sharpe, T R; Menon, R A; Shearer, D; Musa, H; Baker, P H; Sanders, C H; Strachan, P A; Kelly, N J and Markopoulos, A (2012) Energy and environmental appraisal of domestic laundering appliances. Building Research & Information, 40(6), pp. 679-699. ISSN 0961-3218
Porwal, A; Parsamehr, M; Szostopal, D; Ruparathna, R and Hewage, K (2023) The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. International Journal of Construction Management, 23(1), pp. 156-166. ISSN 1562-3599
Potts, K (2009) Construction during World War II: Management and financial administration. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988
Powell, R (2012) Evaluating cognitive screening as a possible solution to reducing accidents and improving workplace productivity through early preventive detection of fatigue-impairment in the construction industry. PhD thesis, University of Bath, UK.
Powell, R and Copping, A (2010) Sleep deprivation and its consequences in construction workers. Journal of Construction Engineering and Management, 136(10), pp. 1086-1092. ISSN 0733-9364
Powell, R and Copping, A (2010) Construction worker sleep deprivation and its effects on personal safety. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Power, W; Sinnott, D and Lynch, P (2021) Evaluating the efficacy of a dedicated last planner® system facilitator to enhance construction productivity. Construction Economics and Building, 21(3), pp. 142-158. ISSN 2204-9029
Prachi Vinod, I; Gangadhar, M and Deepak, M D (2021) Identifying the performance areas affecting the project performance for Indian construction projects. Journal of Engineering, Design and Technology, 19(1), pp. 1-20. ISSN 1726-0531
Pradhan, A R (2009) An approach for fusing data from multiple sources to support construction productivity analyses. PhD thesis, Carnegie Mellon University, USA.
Prayogo, A; Teophilea, H S; Nugraha, P; Sunindijo, R Y; Maharani, C F and Yang, K (2025) Noise disturbance increases negative emotions and unsafe behaviour among construction workers. International Journal of Construction Management, 25(8), pp. 932-939. ISSN 1562-3599
Premakumara, A and Siriwardana, C (2025) A comprehensive approach for assessing the causes of low productivity in the construction sector: A systematic categorization and ranking using Pareto and fuzzy analysis. Construction Management and Economics, 43(1), pp. 40-58. ISSN 0144-6193
Price, A D F (1986) An evaluation of production output for in situ concrete work. PhD thesis, Loughborough University, UK.
Pritchard, C R (1999) Access to construction work and resources in Zimbabwe: An institutional analysis of the development of the construction industry. PhD thesis, London South Bank University, UK.
Priven, V and Sacks, R (2015) Effects of the last planner system on social networks among construction trade crews. Journal of Construction Engineering and Management, 141(6): 04015006, ISSN 0733-9364
Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(2), pp. 174-181. ISSN 0969-9988
Pryke, S D (2004) Analysing construction project coalitions: Exploring the application of social network analysis. Construction Management and Economics, 22(8), pp. 787-797. ISSN 01446193
Pulaski, M H (2005) The alignment of sustainability and constructability: A continuous value enhancement process. PhD thesis, Pennsylvania State University, USA.
Pulaski, M H and Horman, M J (2005) Continuous value enhancement process. Journal of Construction Engineering and Management, 131(12), pp. 1274-1282. ISSN 0733-9364
Puybaraud, M-C (2001) A model of the role of management in construction fire safety failure scenarios. PhD thesis, Heriot-Watt University, UK.
Pérez, C T and Bastos Costa, D (2021) Increasing production efficiency through the reduction of transportation activities and time using 4D BIM simulations. Engineering, Construction and Architectural Management, 28(8), pp. 2222-2247. ISSN 0969-9988
Pérez, C T and Costa, D (2018) Developing a taxonomy of transportation waste in construction production processes. Built Environment Project and Asset Management, 8(5), pp. 434-448. ISSN 2044-124X
Qiao, Y; Fricker, J D and Labi, S (2019) Influence of project bundling on maintenance of traffic costs across highway project types. Journal of Construction Engineering and Management, 145(8): 05019010, ISSN 0733-9364
Qin, B and Green, S (2019) Change and continuity in the Chinese construction sector: Practitioner responses to bidding and tendering. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Quah, L K (1988) An evaluation of the risks in estimating and tendering for refurbishment work. PhD thesis, Heriot-Watt University, UK.
Quarmby, T (2011) Safe, healthy and sustainable demolition. PhD thesis, Loughborough University, UK.
Rad, Mahyar Habibi (2022) Impact of lean construction on contractor performance and organisational resilience in post-disaster infrastructure projects. PhD thesis, University of New South Wales, Australia.
Radzi, A R; Rahman, R A; Doh, S I and Esa, M (2022) Construction readiness for highway projects: Key decision criteria. Journal of Construction Engineering and Management, 148(2): 04021196, ISSN 0733-9364
Raidén, A B and King, A (2023) Added value and numerical measurement of social value: A critical enquiry. Buildings & Cities, 4(1), pp. 767-782. ISSN 2632-6655
Raisbeck, P; Millie, R and Maher, A (2010) Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Rajput, B; Kore, S and Agarwal, A (2024) Competencies of civil engineering graduates: Indian construction professionals' perspective. International Journal of Construction Management, 24(11), pp. 1240-1248. ISSN 1562-3599
Ramli, A H (2014) Relationships between safety climate factors and occupational safety and health level of awareness in Malaysian government agencies. PhD thesis, University of Malaya, Malaysia.
Ramsay-Dawber, P A (1995) A critique of the business performance measures of UK construction companies. Journal of Construction Procurement, 1(2), pp. 100-110. ISSN 1358-9180
Ranasinghe, U; Ruwanpura, J and Liu, X (2012) Streamlining the construction productivity improvement process with the proposed role of a construction productivity improvement officer. Journal of Construction Engineering and Management, 138(6), pp. 697-706. ISSN 0733-9364
Rankin, K; Suji, M; Pandey, B; Baniya, J; Hirslund, D V; Limbu, B; Rawal, N and Shneiderman, S (2026) Negotiating expertise in nepal's post-earthquake disaster reconstruction. Buildings & Cities, 7(1), pp. 1-19. ISSN 2632-6655
Rashid, K B A (1998) The processes of construction procurement in Malaysia: Identification of constraints and development of proposed strategies in the context of 'vision 2020'. PhD thesis, Nottingham Trent University, UK.
Rashid, K B A (2002) An assessment on the systems of registration of contracting firms in Malaysia. Journal of Construction Procurement, 8(2), pp. 148-159. ISSN 1358-9180
Rashid, K B A and Morledge, R (1998) Constraints in resources and functions within the process of construction procurement in Malaysia. Journal of Construction Procurement, 4(1), pp. 27-44. ISSN 1358-9180
Rashidfarokhi, A and Danivska, V (2023) Managing crises 'together': How can the built environment contribute to social resilience? Building Research & Information, 51(7), pp. 747-763. ISSN 0961-3218
Rasmussen, F. N.; Birkved, M. and Birgisdóttir, H. (2020) Low-carbon design strategies for new residential buildings: Lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007
Rasmussen, F N; Birkved, M and Birgisdóttir, H (2020) Low- carbon design strategies for new residential buildings: lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007
Rasul, N; Malik, M S A; Bakhtawar, B and Thaheem, M J (2021) Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, 21(11), pp. 1099-1114. ISSN 1562-3599
Rathnayake, A and Middleton, C (2023) Systematic review of the literature on construction productivity. Journal of Construction Engineering and Management, 149(6): 03123005, ISSN 0733-9364
Rathnayake, A; Murguia, D and Middleton, C (2024) Measuring activity-level construction productivity. Journal of Construction Engineering and Management, 150(8): 04024099, ISSN 0733-9364
Ratnasabapathy, S; Alashwal, A and Perera, S (2021) Investigation of waste diversion rates in the construction and demolition sector in Australia. Built Environment Project and Asset Management, 11(3), pp. 427-439. ISSN 2044-124X
Ravindranath, D (2018) Maternal health and child malnutrition among migrant households engaged in construction work (Ahmedabad, India). PhD thesis, Washington University in St. Louis, USA.
Rayhan, D S A and Bhuiyan, I U (2025) A framework for evaluation of construction and demolition waste management alternatives using MCDA techniques in the context of Dhaka City. International Journal of Construction Management, 25(4), pp. 481-493. ISSN 1562-3599
Razavi, S N; Montaser, A and Moselhi, O (2012) RFID deployment protocols for indoor construction. Construction Innovation, 12(2), pp. 239-258. ISSN 1471-4175
Reinschmidt, K F; Griffis, F H and Bronner, P L (1991) Integration of engineering, design, and construction. Journal of Construction Engineering and Management, 117(4), pp. 756-772. ISSN 0733-9364
Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099
Ren, Z; Kwaw, P and Yang, F (2012) Ghana's public procurement reform and the continuous use of the traditional procurement system: The way forward. Built Environment Project and Asset Management, 2(1), pp. 56-69. ISSN 2044-124X
Rener, A T (2022) Innovative methodologies to enhance productivity, supply chain, and sustainability in industrialized construction. PhD thesis, Lawrence Technological University, USA.
Rezakhani, P (2023) Empirical study of housing recovery and property abandonment following valley fire in California: Insights from neighborhood characteristics and building attributes. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 628-639. ISSN 1759-5916
Ridgeway, L L (2003) An evaluation of the current status of the OSHA hazard communication program within the western Kentucky construction industry. PhD thesis, Southern Illinois University at Carbondale, USA.
Riley, D R and Sanvido, V E (1995) Patterns of construction-space use in multistory buildings. Journal of Construction Engineering and Management, 121(4), pp. 464-473. ISSN 0733-9364
Rivas, R A; Borcherding, J D; Gonzlez, V and Alarcn, L F (2011) Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company. Journal of Construction Engineering and Management, 137(4), pp. 312-320. ISSN 0733-9364
Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Robson, A; Boyd, D and Thurairajah, N (2015) Are contractors' cost accounting practices up to the job of establishing improvement in site operations? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193
Rocha, C G D; Anzanello, M J and Gerchman, M (2018) Method to assess the match between clients' input and decoupling points in customized building projects. Journal of Construction Engineering and Management, 144(5): 04018018, ISSN 0733-9364
Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175
Rodriguez, F S; Spilski, J; Hekele, F; Beese, N O and Lachmann, T (2020) Physical and cognitive demands of work in building construction. Engineering, Construction and Architectural Management, 27(3), pp. 745-764. ISSN 0969-9988
Rogan, A (1999) Inter-organisational relationships in the construction process. PhD thesis, University of the West of England, Bristol, UK.
Rogers, B W (2010) "It's not just about the buildings, it's about the people": Architecture practice, and preservation in post-Katrina New Orleans. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Rojas, E M and Aramvareekul, P (2003) Is construction labor productivity really declining? Journal of Construction Engineering and Management, 129(1), pp. 41-46. ISSN 0733-9364
Rokooei, S (2016) Project management education research excellence within cyber-infrastructure environment. PhD thesis, University of Nebraska - Lincoln, USA.
Rose, Colin (2019) Systems for reuse, repurposing and upcycling of existing building components. PhD thesis, University College London, UK.
Rosowsky, D V (2011) Recovery: Rebuilding a resilient housing stock. International Journal of Disaster Resilience in the Built Environment, 2(2), pp. 139-147. ISSN 1759-5916
Ross, A (2011) Supply chain management in an uncertain economic climate: A UK perspective. Construction Innovation, 11(1), pp. 5-13. ISSN 1471-4175
Rossetto, Daniel Marc (2024) Incentivising the recovery and utilisation of construction and demolition waste. PhD thesis, University of Adelaide, Australia.
Rotimi, F E; Rotimi, J O B; Silva, C W C; Olatunji, O A and Ramanayaka, C E D (2023) The determinants of job satisfaction amongst specific migrant construction workers. Built Environment Project and Asset Management, 13(5), pp. 738-755. ISSN 2044-124X
Rotimi, J O B and Wilkinson, S (2014) Improving environmental management legislation to facilitate post-disaster reconstruction. International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 23-37. ISSN 1759-5916
Rowings, J E; Federle, M O and Birkland, S A (1996) Characteristics of the craft workforce. Journal of Construction Engineering and Management, 122(1), pp. 83-90. ISSN 0733-9364
Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts. PhD thesis, Brunel University, UK.
Rubio-Romero, J C; Rubio, M C and García-Hernández, C (2013) Analysis of construction equipment safety in temporary work at height. Journal of Construction Engineering and Management, 139(1), pp. 9-14. ISSN 0733-9364
Ruddock, L and Wharton, A (2001) Analysing the construction sector: Progress towards a new framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Russell, J S and Skibniewski, M J (1990) An ergonomic analysis framework for construction tasks. Construction Management and Economics, 8(3), pp. 329-338. ISSN 01446193
Rwamamara, R; Norberg, H; Olofsson, T and Lagerqvist, O (2010) Using visualization technologies for design and planning of a healthy construction workplace. Construction Innovation, 10(3), pp. 248-266. ISSN 1471-4175
Rwamamara, R and Simonsson, P (2009) Health and safety in concrete casting processes. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Rwamamara, R A (2007) Planning the healthy construction workplace through risk assessment and design methods. PhD thesis, Luleå University of Technology, Sweden.
Ryu, H G; Lee, H S and Yu, J H (2003) A method for analysing delay duration considering lost productivity through construction productivity data model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Ryu, J; Seo, J; Jebelli, H and Lee, S (2019) Automated action recognition using an accelerometer-embedded wristband-type activity tracker. Journal of Construction Engineering and Management, 145(1): 04018114, ISSN 0733-9364
Rönnberg, N; Ringdahl, R and Fredriksson, A (2023) Measurement and sonification of construction site noise and particle pollution data. Smart and Sustainable Built Environment, 12(4), pp. 742-764. ISSN 2046-6099
Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218
Sabharwal, A; Syal, M and Hastak, M (2009) Impact of manufactured housing component assembly redesign on facility layout and production process. Construction Innovation, 9(1), pp. 58-71. ISSN 1471-4175
Sacks, A; Nisbet, A; Ross, J and Harinarain, N (2012) Life cycle cost analysis: A case study of Lincoln on the Lake. Journal of Engineering, Design and Technology, 10(2), pp. 228-254. ISSN 1726-0531
Sacks, R; Whyte, J; Swissa, D; Raviv, G; Zhou, W and Shapira, A (2015) Safety by design: Dialogues between designers and builders using virtual reality. Construction Management and Economics, 33(1), pp. 55-72. ISSN 01446193
Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.
Saeed, F; Mostafa, K; Rauch, C and Hegazy, T (2023) Environmental impact and cost assessment for reusing waste during end-of-life activities on building projects. Journal of Construction Engineering and Management, 149(10): 04023099, ISSN 0733-9364
Saez Ujaque, D; Fuertes Perez, P; Garcia Almirall, M P and de Balanzó Joue, R (2022) Embedded resilience in the built stock. Lessons from socio-spatial interpretation. The case of canfugarolas (mataro-barcelona). Building Research & Information, 50(3), pp. 351-368. ISSN 0961-3218
Safapour, E; Kermanshachi, S and Rouhanizadeh, B (2022) Key components of successful post–hurricane reconstruction of transportation infrastructures. Built Environment Project and Asset Management, 12(5), pp. 775-791. ISSN 2044-124X
Safari, K and Ghandehariun, S (2026) An integrative BIM-based life cycle assessment framework to address uncertainties: A mixed-methods study under real construction project context. International Journal of Construction Management, 26(1), pp. 54-75. ISSN 1562-3599
Safikhani, S.; Shafaat, A. and Sartipipour, M. (2026) Automated project rescheduling with preemptive activity splitting for baseline restoration. Journal of Construction Engineering and Management, 152(6): 04026065, ISSN 0733-9364
Sahin, C. and Yildirim, N. (2026) Revisiting digital technology adoption in the construction industry: Practice-informed, context-specific validation of existing knowledge. Smart and Sustainable Built Environment, pp. 1-29. ISSN 2046-6099
Said, H and El-Rayes, K (2011) Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6), pp. 421-431. ISSN 0733-9364
Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364
Saidu, I; Shakantu, W; Adamu, A and Anugwo, I (2017) A bespoke approach for relating material waste to cost overrun in the construction indsutry. Journal of Construction Business and Management, 1(1), pp. 39-52. ISSN 2521-0165
Saka, N and Lowe, J G (2010) The impact of the petroleum sector on the output of the Nigerian construction sector. Construction Management and Economics, 28(12), pp. 1301-1312. ISSN 1466433X
Saka, N and Olanipekun, A O (2021) Impact of the banking sector reform in the construction sector. Journal of Financial Management of Property and Construction, 26(3), pp. 387-407. ISSN 1366-4387
Saka, N and Olanipekun, A O (2023) Relationship between the economy, construction sector and imports in Nigeria. International Journal of Construction Management, 23(2), pp. 297-306. ISSN 1562-3599
Sakhakarmi, S (2022) Automated approach for the enhancement of scaffolding structure monitoring with strain sensor data. PhD thesis, University of Nevada, Las Vegas, USA.
Sakhakarmi, S; Park, J and Cho, C (2019) Enhanced machine learning classification accuracy for scaffolding safety using increased features. Journal of Construction Engineering and Management, 145(2): 04018133, ISSN 0733-9364
Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Saleh, Nour M M (2025) Post-disaster management in housing reconstruction. DEng thesis, Technische Universitaet Berlin, Germany.
Sam, Mahya (2023) Exploring the relationship between human-robot collaboration (HRC) and the resilience of construction work processes. PhD thesis, University of Florida, USA.
Samarasingha, D.; Ranadewa, K. A. T. O. and Parameswaran, A. (2026) Extended reality-integrated construction progress monitoring in the construction industry. Journal of Engineering, Design and Technology, 24(5), pp. 1135-1155. ISSN 1726-0531
Sanchez, B and Haas, C (2018) Capital project planning for a circular economy. Construction Management and Economics, 36(6), pp. 303-312. ISSN 01446193
Sandagomika, H; Bazli, M and Arashpour, M (2026) Quantifying embodied carbon reductions through mixed reality integration in prefabrication: A Monte Carlo-enhanced life cycle approach. Journal of Construction Engineering and Management, 152(5): 04026051, ISSN 0733-9364
Sandanayake, M; Yang, W; Chhibba, N and Vrcelj, Z (2022) Residential building defects investigation and mitigation: a comparative review in Victoria, Australia, for understanding the way forward. Engineering, Construction and Architectural Management, 29(9), pp. 3689-3711. ISSN 0969-9988
Sandberg, R; Räisänen, C; Löwstedt, M and Raidén, A B (2016) Exploring the work practices of site managers as processes of embodiment. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Sanusi, K O and Oliver, G J (2009) Effects of grain size on mechanical properties of nanostructured copper alloy by severe plastic deformation (SPD) process. Journal of Engineering, Design and Technology, 7(3), pp. 335-341. ISSN 1726-0531
Sanvido, V E (1988) Conceptual construction process model. Journal of Construction Engineering and Management, 114(2), pp. 294-310. ISSN 0733-9364
Saraei, M H; Sharifi, A and Adeli, M (2023) Optimization of spatial distribution of hospitals for better earthquake recovery using GIS and imperialist competition algorithm (case study: Gorgan, Iran). International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 285-300. ISSN 1759-5916
Sarden, Y and Stehn, L (2006) Industrialisation as a tool for reducing uncertainty in construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Sargent, A C (2018) Building modern India: Transformations of labor in the Indian construction industry. PhD thesis, University of Chicago, USA.
Sarhan, Jamil Ghazi I (2018) Development of a lean construction framework for the Saudi Arabian construction industry. PhD thesis, Queensland University of Technology, Australia.
Sarikas, R H (1981) Regulatory and financial aspects of the utility industry rate treatment of construction work in progress. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Sassi, P (2008) Defining closed-loop material cycle construction. Building Research & Information, 36(5), pp. 509-519. ISSN 0961-3218
Sassi, P (2009) Closed loop material cycle construction: defining and assessing closed loop material cycle construction as a component of a comprehensive approach to sustainable material design in the context of sustainable building. PhD thesis, Cardiff University, UK.
Sawhney, A; Walsh, K D; Bashford, H H and Palaniappan, S (2009) Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management, 135(4), pp. 319-329. ISSN 0733-9364
Sayed Zayed, N.; Badawy Abu-Sena, A. B.; Attia, T. M. and Ahmed, A. (2026) Integrating recycled materials in road construction: A cost-effective and sustainable approach. International Journal of Construction Management, 26(7), pp. 1222-1238. ISSN 1562-3599
Sazalli, S A H; Greenwood, D; Morton, D and Agnew, B (2012) Industrialized building system in Malaysian housing: An emerging innovation system explanation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Schaefer, K K (2024) Community insurance as a flood management element in California. PhD thesis, University of California, Davis, USA.
Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.
Schmidt, J R (1997) Quantifying the impact of construction accidents using predictive models. PhD thesis, State University of New York at Buffalo, USA.
Scholtenhuis, L L O; Hartmann, T and Dorée, A G (2016) Testing the value of 4D visualizations for enhancing mindfulness in utility reconstruction works. Journal of Construction Engineering and Management, 142(7): 4016015, ISSN 0733-9364
Schultmann, F and Rentz, O (2002) Scheduling of deconstruction projects under resource constraints. Construction Management and Economics, 20(5), pp. 391-401. ISSN 01446193
Schultmann, F and Sunke, N (2007) Energy-oriented deconstruction and recovery planning. Building Research & Information, 35(6), pp. 602-615. ISSN 0961-3218
Schönbeck, P (2022) Data based configuration decisions in hospital construction projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(6), pp. 945-961. ISSN 0969-9988
Sears, M H (2020) Advanced eye tracking analysis for investigating construction craft professional interactions with 2D drawings. PhD thesis, University of Colorado at Boulder, USA.
Sebastian, R (2011) Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18(2), pp. 176-187. ISSN 0969-9988
Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988
Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599
Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. PhD thesis, University of Salford, UK.
Senaratne, S and Rasagopalasingam, V (2017) The causes and effects of work stress in construction project managers: The case in Sri Lanka. International Journal of Construction Management, 17(1), pp. 65-75. ISSN 1562-3599
Senaratne, S and Sexton, M G (2004) Managing construction project change in the knowledge age: A case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(2), pp. 186-200. ISSN 0969-9988
Seneviratne, K; Perera, S; Ginigaddara, B; Jin, X; Tang, L and Osei Kyei, R (2024) Good practices in COVID-19 risk reduction adopted by Australian construction enterprises. Built Environment Project and Asset Management, 14(3), pp. 449-469. ISSN 2044-124X
Seo, J; Lee, S and Seo, J (2016) Simulation-based assessment of workers' muscle fatigue and its impact on construction operations. Journal of Construction Engineering and Management, 142(11): 04016063, ISSN 0733-9364
Sertyeşilışık, B (2007) An investigation on the application of standard contracts in the Turkish construction industry. PhD thesis, Middle East Technical University, Turkey.
Sezer, A A and Bröchner, J (2014) The construction productivity debate and the measurement of service qualities. Construction Management and Economics, 32(6), pp. 565-574. ISSN 01446193
Shaddad, M Y I (1983) The influence of management on construction system productivity at the project level : A conceptual system causal research model. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Shah, M; Tang, L and Hughes, W P (2012) Exploring process, productivity and structure in design. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Shah, M N; Dixit, S; Kumar, R; Jain, R and Anand, K (2021) Causes of delays in slum reconstruction projects in India. International Journal of Construction Management, 21(5), pp. 452-467. ISSN 1562-3599
Shahhosseini, V; Afshar, M R and Amiri, O (2018) Value engineering practices in infrastructure projects: A case study of Ilam gas refinery's water transmission system at Reno Mountain, Iran. International Journal of Construction Management, 18(5), pp. 351-363. ISSN 1562-3599
Shahparvari, M (2023) Minimisation of rework in UK housing construction: contribution of subcontractors. PhD thesis, London South Bank University, UK.
Shan, Y (2014) Integrated information modeling of construction project productivity. PhD thesis, University of Colorado at Boulder, USA.
Shan, Y; Goodrum, P M; Zhai, D; Haas, C and Caldas, C H (2011) The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), pp. 305-316. ISSN 1466433X
Shang, G; Pheng, L S and Gina, O L T (2021) Understanding the low adoption of prefabrication prefinished volumetric construction (ppvc) among SMEs in Singapore: From a change management perspective. International Journal of Building Pathology and Adaptation, 39(5), pp. 685-701. ISSN 23984708
Shang, T; Hu, X; Ye, K and Tam, V W Y (2023) Will contractors pursue unsustainable practices following environmental recovery? A highway case in China. Engineering, Construction and Architectural Management, 30(3), pp. 1165-1182. ISSN 0969-9988
Shao, L; Guo, S; Dong, Y; Niu, H and Zhang, P (2023) Cause analysis of construction collapse accidents using association rule mining. Engineering, Construction and Architectural Management, 30(9), pp. 4120-4142. ISSN 0969-9988
Shao, Y and Sun, Y (2025) Examining governance of post-earthquake reconstruction planning from an evolutionary resilience perspective. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 38-56. ISSN 1759-5908
Shapira, A and Goldfinger, D (2000) Work-input model for assembly and disassembly of high shoring towers. Construction Management and Economics, 18(4), pp. 467-477. ISSN 01446193
Shapira, A and Raz, Y (2005) Comparative analysis of shoring towers for high-clearance construction. Journal of Construction Engineering and Management, 131(3), pp. 293-301. ISSN 0733-9364
Shapira, A; Shahar, Y and Raz, Y (2001) Design and construction of high multitier shoring towers: Case study. Journal of Construction Engineering and Management, 127(2), pp. 108-115. ISSN 0733-9364
Sharif, M M; Chuo, S and Haas, C T (2022) Rapid 3D quality control in prefabrication using a 3D digital-templates framework. Journal of Construction Engineering and Management, 148(11): 04022117, ISSN 0733-9364
Sharma, H; McIntyre, C; Gao, Z and Nguyen, T H (2009) Developing a traffic closure integrated linear schedule for highway rehabilitation projects. Journal of Construction Engineering and Management, 135(3), pp. 146-155. ISSN 0733-9364
Sharma, N and Laishram, B (2025) Decoding the emergent patterns of cost of quality through the lens of sociotechnical systems: A bibliometric analysis. Journal of Construction Engineering and Management, 151(4): 03125002, ISSN 0733-9364
Shelton, J; Martek, I and Chen, C (2016) Implementation of innovative technologies in small-scale construction firms: Five Australian case studies. Engineering, Construction and Architectural Management, 23(2), pp. 177-191. ISSN 0969-9988
Shen, K; Li, X; Cao, X and Zhang, Z (2022) Prefabricated construction process optimization based on rework risk. Journal of Construction Engineering and Management, 148(6): 04022031, ISSN 0733-9364
Shen, K; Li, X; Cao, X and Zhihui, Z (2021) Research on the rework risk core tasks in prefabricated construction in China. Engineering, Construction and Architectural Management, 28(10), pp. 3299-3321. ISSN 0969-9988
Shen, K; Zhu, Y; Pan, J and Li, X (2023) An intelligent decision-making model for the design of precast slab joints based on case-based reasoning. Journal of Construction Engineering and Management, 149(5): 04023025, ISSN 0733-9364
Shen, L Y; Lu, W S and Yam, M C H (2006) Contractor key competitiveness indicators: A China study. Journal of Construction Engineering and Management, 132(4), pp. 416-424. ISSN 0733-9364
Shen, X; Marks, E; Pradhananga, N and Cheng, T (2016) Hazardous proximity zone design for heavy construction excavation equipment. Journal of Construction Engineering and Management, 142(6): 05016001, ISSN 0733-9364
Shen, Y; Lin, Z and Wang, Z (2022) Single-side accumulative jacking construction method for large-span arched latticed shells. Journal of Construction Engineering and Management, 148(12): 06022001, ISSN 0733-9364
Shepherd, S and Woskie, S R (2010) Case study to identify barriers and incentives to implementing an engineering control for concrete grinding dust. Journal of Construction Engineering and Management, 136(11), pp. 1238-1248. ISSN 0733-9364
Sherif, E h and Kaka, A (2004) A multi criteria mode for the selection of the payments systems in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Sherratt, F; Ivory, C; Sherratt, S and Crawley, S (2022) Organizing construction work: A digital and cooperative way forwards for micro-projects. Building Research & Information, 50(5), pp. 559-573. ISSN 0961-3218
Sherratt, F and Sherratt, S (2017) The road to hell: Worker health, safety and wellbeing within UK corporate social responsibility practices. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Sherratt, F; Welfare, K; Hallowell, M and Hoque Tania, M (2018) Legalized recreational marijuana: Safety, ethical, and legal perceptions of the workforce. Journal of Construction Engineering and Management, 144(6): 04018048, ISSN 0733-9364
Shi, J J (1999) A neural network based system for predicting earthmoving production. Construction Management and Economics, 17(4), pp. 463-471. ISSN 01446193
Shim, E (2008) The decision-making modeling for concurrent planning of construction projects. PhD thesis, Texas A&M University, USA.
Shooshtarian, S; Lingard, H and Wong, P S P (2020) Using the cost of construction work to trigger legislative duties for WHS: The Australian experience. Built Environment Project and Asset Management, 10(3), pp. 369-387. ISSN 2044-124X
Short, C A; Noakes, C J; Gilkeson, C A and Fair, A (2014) Functional recovery of a resilient hospital type. Building Research & Information, 42(6), pp. 657-684. ISSN 0961-3218
Shrivas, A and Singla, H K (2022) Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach. International Journal of Construction Management, 22(8), pp. 1455-1463. ISSN 1562-3599
Shuvo, S R S; Islam, M N and Islam, S T (2022) Role of information and communication technologies in build back better to post disaster recovery practices: Insights from Bangladesh. International Journal of Disaster Resilience in the Built Environment, 13(2), pp. 233-247. ISSN 1759-5916
Siebken Schultz, C (2012) Construction production failure in a structural perspective: A study of reactive and proactive problem-solving practices. PhD thesis, Chalmers University of Technology, Sweden.
Sigonda, G G G (2000) The impact of infrastructural projects on the environment in Tanzania: The case of mindu dam. PhD thesis, University of Manchester, UK.
Silva, Renata Moreira de Sa e (2023) Contributions of psychodynamics of work to health and safety management in civil construction works. PhD thesis, Universidade de Brasília, Brazil.
Simons, A E; Redden, L and Collins, W (2023) Sitework knowledge for entry-level construction professionals: Academic and industry perceptions. International Journal of Construction Education and Research, 19(2), pp. 199-220. ISSN 1557-8771
Simpeh, E K; Ndihokubwayo, R; Love, P E D and Thwala, W D (2015) A rework probability model: A quantitative assessment of rework occurrence in construction projects. International Journal of Construction Management, 15(2), pp. 109-116. ISSN 1562-3599
Simukonda, W and Emuze, F (2024) Safety impacts of design for manufacturing and assembly techniques in off-site construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(1), pp. 16-24. ISSN 17514304
Simukonda, W and Kamwela, N (2021) The management of theft and vandalism on construction jobsites in the southern region of Malawi. Journal of Construction Business and Management, 5(1), pp. 47-59. ISSN 2521-0165
Sing, M C P; Edwards, D J; Liu, H J X and Love, P E D (2015) Forecasting private-sector construction works: VAR model using economic indicators. Journal of Construction Engineering and Management, 141(11): 04015037, ISSN 0733-9364
Sing, M C P; Fung, I W H; Edwards, D J and Liu, H (2022) Dynamic construction site layout planning: An application of branch and bond algorithm. International Journal of Building Pathology and Adaptation, 40(4), pp. 523-538. ISSN 23984708
Singh, A (1990) Development of process and mix flexibility in construction. PhD thesis, Purdue University, USA.
Singh, A (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(5), pp. 312-321. ISSN 0969-9988
Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.
Siriwardena, N (2012) Managing stakeholder needs and expectations in a post-disaster housing reconstruction scenario. PhD thesis, University of Salford, UK.
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364
Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193
Skinner, D (1998) Forecasting models of activity in industrial and commercial building. PhD thesis, University of Salford, UK.
Skitmore, M and Smyth, H (2007) Pricing construction work: A marketing viewpoint. Construction Management and Economics, 25(6), pp. 619-630. ISSN 1466433X
Slaughter, E S (1991) "Rapid" innovation and integration of components: Comparison of user and manufacturer innovations through a study of residential construction. PhD thesis, Massachusetts Institute of Technology, USA.
Small, E P; Bakry, I and Ayyash, L (2021) Evaluating the effect of TQM on mep construction productivity and project delivery in Dubai. International Journal of Construction Management, 21(10), pp. 1061-1075. ISSN 1562-3599
Smallwood, J (2006) Scaffolding health and safety: A multi-stakeholder issue. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Smallwood, J J (2003) The image of contractors: A South African case study. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.
Smith, J; Edwards, D J; Martek, I; Chileshe, N; Hayhow, S and Roberts, C J (2023) The antecedents of construction project change: An analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3), pp. 655-689. ISSN 1726-0531
Smolders, A L (2019) Trust unravelled: In inter-organisational relationships in a regulated tender environment. PhD thesis, Delft University of Technology, Netherlands.
Sobeih, T; Salem, O; Genaidy, A; Abdelhamid, T S and Shell, R (2009) Psychosocial factors and musculoskeletal disorders in the construction industry. Journal of Construction Engineering and Management, 135(4), pp. 267-277. ISSN 0733-9364
Soetanto, R; Hermawan, F; Milne, A; Hatmoko, J U D; As'ad, S and He, C (2020) Developing sustainable arrangements for "proactive" disaster risk financing in Java, Indonesia. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 435-451. ISSN 1759-5916
Soewin, E and Chinda, T (2022) Development of a construction performance index in the construction industry: System dynamics modelling approach. International Journal of Construction Management, 22(10), pp. 1806-1817. ISSN 1562-3599
Soibelman, L; Liu, L Y; Kirby, J G; East, E W; Caldas, C H and Lin, K Y (2003) Design review checking system with corporate lessons learned. Journal of Construction Engineering and Management, 129(5), pp. 475-484. ISSN 0733-9364
Soleimani, M and Shahandashti, M (2017) Comparative process-based life-cycle assessment of bioconcrete and conventional concrete. Journal of Engineering, Design and Technology, 15(5), pp. 667-688.
Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.
Soliman, E; Al-Tabtabai, H; Almusalam, A and Hussein, M (2023) Impact of COVID-19 on labor's motivational factors and construction productivity. International Journal of Construction Management, 23(15), pp. 2699-2708. ISSN 1562-3599
Soliman, M (2015) Life-cycle management of civil and marine structures under fatigue and corrosion effects. PhD thesis, Lehigh University, USA.
Soltanmohammadlou, Nazi (2025) A sociotechnical system for earthmoving equipment safety in Australian construction sites. PhD thesis, Queensland University of Technology, Australia.
Sompolgrunk, A; Banihashemi, S and Mohandes, S R (2023) Building information modelling (BIM) and the return on investment: A systematic analysis. Construction Innovation, 23(1), pp. 129-154. ISSN 1471-4175
Song, J; Haas, C T and Caldas, C H (2006) Tracking the location of materials on construction job sites. Journal of Construction Engineering and Management, 132(9), pp. 911-918. ISSN 0733-9364
Song, J W; Yu, J H and Kim, C D (2007) Construction safety management using fmea technique: Focusing on the cases of steel frame work. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364
Song, M H (2019) Formalization of smallest workface boundary (SWFB): Toward generating and operating level of development (LOD) 400-based daily bill of materials (BOM). PhD thesis, Stanford University, USA.
Song, S (2017) Construction equipment travel path visualization and productivity evaluation. PhD thesis, University of Alabama, USA.
Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364
Sooksil, N and Benjaoran, V (2014) Validation of construction safety equilibrium model on high-rise building construction project in Thailand. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Sospeter, N G and Kikwasi, G J (2020) Barriers to mentoring of graduates in quantity surveying firms: Finding a good fit. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Sowder, Anne Marie (2023) Framework for recovery: The 1935 hurricane houses of islamorada as a case of successful post-disaster rebuilding. PhD thesis, University of Florida, USA.
Sparer, E H (2015) Improving health and safety in construction: The intersection of programs and policies, work organization, and safety climate. DSc thesis, Harvard University, USA.
Spillane, J and Oyedele, L (2013) Strategies for effective management of health and safety in confined site construction. Construction Economics and Building, 13(4), pp. 50-64. ISSN 2204-9029
Spillane, J P (2013) Challenges and strategies for confined site construction: The case of personnel, plant and material management (PPMM). PhD thesis, Queen's University Belfast, UK.
Spillane, J P and Oyedele, L O (2017) Effective material logistics in urban construction sites: A structural equation model. Construction Innovation, 17(4), pp. 406-428. ISSN 1471-4175
Spillane, J P; Oyedele, L O and von Meding, J K (2012) Confined site construction: An empirical analysis of factors impacting health and safety management. Journal of Engineering, Design and Technology, 10(3), pp. 397-420. ISSN 1726-0531
Spillane, J P; Oyedele, L O; von Meding, J K and Konanahalli, A (2011) Confined site construction: A qualitative review of issues regarding health and safety on-site. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Sporrong, J and Kadefors, A (2014) Municipal consultancy procurement: New roles and practices. Building Research & Information, 42(5), pp. 616-628. ISSN 0961-3218
Ssegawa, J K (1999) Construction industry’s contribution towards botswana’s vision 2016. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Standing, Barry (2025) The link between internal integration and financial performance in engineering and construction companies. PhD thesis, Queensland University of Technology, Australia.
Standinger, M L (2000) The evaluation of time claims in construction projects. PhD thesis, Loughborough University, UK.
Stanley, R and Thurnell, D (2014) The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Construction Economics and Building, 14(1), pp. 105-117. ISSN 2204-9029
Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.
Stefańska, A; Sutkowska, M; Krawczyk, J; Kurcjusz, M; Chudzińska, A; Poćwierz, M and Dixit, S (2025) Ccc2023_possibilities of obtaining energy from aerodynamic phenomena occurring in selected housing estates in warsaw, Poland. International Journal of Construction Management, 25(12), pp. 1463-1476. ISSN 1562-3599
Sterner, E (2002) 'Green procurement' of buildings: A study of Swedish clients' considerations. Construction Management and Economics, 20(1), pp. 21-30. ISSN 01446193
Stover, B D (2004) Validation and evaluation of a disability measure for upper extremity musculoskeletal disorder screening in the workplace and prognostic factors of long-term disability. PhD thesis, University of Washington, USA.
Stringfellow, P (2014) Construction contractors involvement in disaster management planning. Construction Economics and Building, 14(2), pp. 120-132. ISSN 2204-9029
Stukhart, G and Cook, E L (1990) Bar-code standardization in industrial construction. Journal of Construction Engineering and Management, 116(3), pp. 416-431. ISSN 0733-9364
Styhre, A (2009) Tacit knowledge in rock construction work: A study and a critique of the use of the term. Construction Management and Economics, 27(10), pp. 995-1003. ISSN 1466433X
Styhre, A (2011) In the circuit of credibility: Construction workers and the norms of 'a good job'. Construction Management and Economics, 29(2), pp. 199-209. ISSN 1466433X
Su, Y-Y (2010) Construction crew productivity monitoring supported by location awareness technologies. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP). PhD thesis, Columbia University, USA.
Suermann, P C (2009) Evaluating the impact of building information modeling (BIM) on construction. PhD thesis, University of Florida, USA.
Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Sun, K (2020) Three essays on the construction labor market: Getting to work; safety at work; regulation work. PhD thesis, University of Utah, USA.
Sundquist, V; Gadde, L-E and Hulthén, K (2018) Reorganizing construction logistics for improved performance. Construction Management and Economics, 36(1), pp. 49-65. ISSN 0144-6193
Sundquist, V; Leto, A D; Gustafsson, M; Johansson, M and Roupé, M (2020) BIM in construction production: Gains and hinders for firms, projects and industry. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Suraji, A; Sulaiman, K; Mahyuddin, N and Mohamed, O (2006) Rethinking construction safety: An introduction to total safety management. Journal of Construction Research, 7(1), pp. 49-63. ISSN 1609-9451
Susilowati, F; Abadi, M and Wang, Y (2024) Developing a conceptual framework for 'designing out waste' in construction circular economy: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Sutrisna, M and Barrett, P (2007) Applying rich picture diagrams to model case studies of construction projects. Engineering, Construction and Architectural Management, 14(2), pp. 164-179. ISSN 0969-9988
Sveikauskas, L; Rowe, S; Mildenberger, J; Price, J and Young, A (2016) Productivity growth in construction. Journal of Construction Engineering and Management, 142(10): 04016045, ISSN 0733-9364
Swallow, M and Zulu, S (2020) Students’ awareness and perception of the value of BIM and 4D for site health and safety management. Journal of Engineering, Design and Technology, 18(2), pp. 414-430. ISSN 1726-0531
Sweis, G J (2000) Impact of conversion technology on productivity in masonry construction. PhD thesis, Northwestern University, USA.
Sweis, G J; Hiyassat, M and Al-Hroub, F F (2016) Assessing lean conformance by first-grade contractors in the Jordanian construction industry. Construction Innovation, 16(4), pp. 446-459. ISSN 1471-4175
Taggart, M; Koskela, L and Rooke, J (2014) The role of the supply chain in the elimination and reduction of construction rework and defects: An action research approach. Construction Management and Economics, 32(7-8), pp. 829-842. ISSN 01446193
Taggart, M; Koskela, L K and Rooke, J A (2014) An improvement strategy for the defects and rework management process within an SME: An action research approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Taggart M, K L R R (2013) The role of the supply chain in elimination and reduction of construction rework and defects: An action research approach. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.
Tah, J H M; Thorpe, A and McCaffer, R (1994) A survey of indirect cost estimating in practice. Construction Management and Economics, 12(1), pp. 31-36. ISSN 01446193
Taheri Tafti, M and Tomlinson, R (2016) Long-term socio-spatial transformation of earthquake-affected neighbourhoods in Bhuj: Who stayed, who left and who moved in? International Journal of Disaster Resilience in the Built Environment, 7(3), pp. 230-258. ISSN 1759-5916
Tai, S; Wang, Y and Anumba, C J (2009) A survey on communications in large-scale construction projects in China. Engineering, Construction and Architectural Management, 16(2), pp. 136-149. ISSN 0969-9988
Talla, A and McIlwaine, S (2024) Industry 4.0 and the circular economy: Using design-stage digital technology to reduce construction waste. Smart and Sustainable Built Environment, 13(1), pp. 179-198. ISSN 2046-6099
Tam, C M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(2), pp. 120-136. ISSN 1471-4175
Tam, C M; Tong, T K L and Chan, K K (2006) Rough set theory for distilling construction safety measures. Construction Management and Economics, 24(11), pp. 1199-1206. ISSN 1466433X
Tan, L; Zhang, Y; Chen, Y and Zhu, T (2023) A multiple-objective decision-support model for lighting maintenance routing considering carbon dioxide emissions and balanced workload. Journal of Construction Engineering and Management, 149(8): 04023063, ISSN 0733-9364
Tan, W (1996) The elasticity of capital-labour substitution in Singapore construction. Construction Management and Economics, 14(6), pp. 537-542. ISSN 01446193
Tan, W (2000) Total factor productivity in Singapore construction. Engineering, Construction and Architectural Management, 7(2), pp. 154-158. ISSN 0969-9988
Tan, Y; Langston, C; Wu, M and Ochoa, J J (2015) Grey forecasting of construction demand in Hong Kong over the next ten years. International Journal of Construction Management, 15(3), pp. 219-228. ISSN 1562-3599
Tang, J C S; Karasudhi, P and Tachopiyagoon, P (1990) Thai construction industry: Demand and projection. Construction Management and Economics, 8(3), pp. 249-257. ISSN 01446193
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Tang, S L; Lee, H K and Wong, K (1997) Safety cost optimization of building projects in Hong Kong. Construction Management and Economics, 15(2), pp. 177-186. ISSN 01446193
Tang, Y; Liu, C; Feng, K; Yang, X; Li, X and Leng, X (2025) Identifying struck-by hazards in unknown lifting loads: A hybrid computer vision approach. Journal of Construction Engineering and Management, 151(10): 04025146, ISSN 0733-9364
Tanratanawong, S (2001) A neural network model to forecast construction output in the United Kingdom. PhD thesis, University of Newcastle upon Tyne, UK.
Tanratanawong, S and Scott, S (2000) A neural network model to forecast national construction output. Journal of Financial Management of Property and Construction, 5(1-2), pp. 65-77. ISSN 1366-4387
Tansey, P and Spillane, J (2018) Vistas of strategy-making within Northern Ireland construction firms: How sme's differ from large firms. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Tao, X (2023) Distributed common data environment for secure BIM-based collaborative design using blockchain technology. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364
Tarekegn Gurmu, A (2023) Preconstruction phase management practices enhancing labor productivity in multistory building projects. Journal of Construction Engineering and Management, 149(6): 04023032, ISSN 0733-9364
Tariq, M (2012) Green supply chain assessment model for construction projects in the UAE. PhD thesis, University of Salford, UK.
Tavakolan, M; Chokan, F and Dadashi Haji, M (2024) Simultaneous project portfolio selection and scheduling from contractor perspective. International Journal of Construction Management, 24(3), pp. 298-313. ISSN 1562-3599
Tavakoli, A and Kakalia, A (1993) MMS: A materials management system. Construction Management and Economics, 11(2), pp. 143-148. ISSN 01446193
Tavakoli Taba, S; Mojtahedi, M and Newton, S (2020) Disaster risk management approaches in construction and built environment: A research collaboration networks perspective. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 85-99. ISSN 1759-5916
Tavares, d A C; Rocha, L J and Monetti, E (2017) São Paulo's office market: Scenario for the next years. Journal of Financial Management of Property and Construction, 22(2), pp. 154-173. ISSN 1366-4387
Taylor, J M (1981) Development and evaluation of a network scheduling procedure based on utility theory. PhD thesis, Texas A&M University, USA.
Taylor, T R B and Ford, D N (2008) Managing tipping point dynamics in complex construction projects. Journal of Construction Engineering and Management, 134(6), pp. 421-431. ISSN 0733-9364
Teixeira, J M (1993) Contractors management functions: an integrated approach for planning, estimating and control. PhD thesis, Loughborough University, UK.
Tejero-González, A; DeFreitas-Barros-Galvão, V M; Zarzuelo-Sánchez, A M and SanJosé-Alonso, J F (2021) Energy use optimization in ventilation of operating rooms during inactivity periods. Building Research & Information, 49(3), pp. 308-324. ISSN 0961-3218
Tekin, H (2022) The impact of COVID-19 on construction labor productivity: The case of Turkey. Engineering, Construction and Architectural Management, 29(9), pp. 3775-3806. ISSN 0969-9988
Tene Nengou, C B (2019) Framework for the effective implementation of building regulations and policies: The case of Sub-Sahara African countries. PhD thesis, University of Nottingham, UK.
Tennakoon, G A; Rameezdeen, R and Chileshe, N (2024) Walking the talk towards sustainable consumption: Interventions to promote the uptake of reprocessed construction materials. Engineering, Construction and Architectural Management, 31(7), pp. 2878-2899. ISSN 0969-9988
Tente, P; Misheng'u Mwanaumo, E and Didibhukut Thwala, W (2023) Sources and control measures of crystalline silica dust in a road and building project in Zambia. Journal of Construction Business and Management, 6(1), pp. 43-52. ISSN 2521-0165
Teo, P and Love, P E D (2017) Re-examining the association between quality and safety performance in construction: From heterogeneous to homogeneous datasets. Journal of Construction Engineering and Management, 143(6): 04017011, ISSN 0733-9364
Tetik, M; Peltokorpi, A; Seppänen, O; Leväniemi, M and Holmström, J (2021) Kitting logistics solution for improving on-site work performance in construction projects. Journal of Construction Engineering and Management, 147(1): 05020020, ISSN 0733-9364
Thakur, K A (2016) Empirical analysis to investigate the influence of cultural dimensions on risk-taking behavior among Hispanic and non-Hispanic construction workers in United States. PhD thesis, University of Tennessee, USA.
Thiengburanathum, P (2003) Design of construction production systems: Representation, taxonomy, and design framework. PhD thesis, University of Colorado at Boulder, USA.
Thomas, A V and Sudhakumar, J (2013) Critical analysis of the key factors affecting construction labour productivity: An Indian perspective. International Journal of Construction Management, 13(4), pp. 103-125. ISSN 1562-3599
Thomas, H R; Mathews, C T and Ward, J G (1986) Learning curve models of construction productivity. Journal of Construction Engineering and Management, 112(2), pp. 245-258. ISSN 0733-9364
Thomas, H R and Raynar, K A (1997) Scheduled overtime and labor productivity: Quantitative analysis. Journal of Construction Engineering and Management, 123(2), pp. 181-188. ISSN 0733-9364
Thomas, H R and Sanvido, V E (2000) Role of the fabricator in labor productivity. Journal of Construction Engineering and Management, 126(5), pp. 358-365. ISSN 0733-9364
Thomas, H R; Sanvido, V E and Sanders, S R (1989) Impact of material management on productivity: a case study. Journal of Construction Engineering and Management, 115(3), pp. 370-384. ISSN 0733-9364
Thomas, H R and Yiakoumls, I (1987) Factor model of construction productivity. Journal of Construction Engineering and Management, 113(4), pp. 623-639. ISSN 0733-9364
Thompson, E T (1997) A rational approach to computer integration in construction. PhD thesis, London South Bank University, UK.
Thompson, M J (2023) Environmental sustainability of small wastewater treatment systems and pathways for improvement. PhD thesis, University of Nebraska - Lincoln, USA.
Thompson, N E (2005) Business excellence: lessons for the construction industry. PhD thesis, Loughborough University, UK.
Thomson, C S; El-Haram, M A; Hardcastle, C and Horner, R M W (2008) Developing an urban sustainability assessment protocol reflecting the project lifecycle. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Thomson, D S; Austin, S A; Root, D S; Thorpe, A and Hammond, J W (2006) A problem-solving approach to value-adding decision making in construction design. Engineering, Construction and Architectural Management, 13(1), pp. 43-61. ISSN 0969-9988
Thomson, W (2015) China constructs: Architecture, labor, and value on a Chinese construction site. PhD thesis, New York University, USA.
Thorpe, D and Karan, E (2008) Method for calculating schedule delay considering weather conditions. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Thorpe, T (1992) Information flow in house building organisations. PhD thesis, Loughborough University, UK.
Thunberg, M (2016) Developing a framework for supply chain planning in construction. PhD thesis, Linköping University, Sweden.
Tiew, S Y (2025) Improving professional development through building contract administration (bca) framework of housing projects for graduate architects. Engineering, Construction and Architectural Management, 32(8), pp. 5272-5290. ISSN 0969-9988
Tiew, S Y (2025) A construction contract administration (cca) framework for graduate architects' professional development. Engineering, Construction and Architectural Management, 32(12), pp. 8056-8072. ISSN 0969-9988
Tiew, S Y; Aman Hashim, H and Zolkafli @ Zulkifly, U K (2025) Factors influencing the effectiveness of graduate architects as construction contract administrators (cca). Engineering, Construction and Architectural Management, 32(1), pp. 332-348. ISSN 0969-9988
Tirado Fabian, D R (2022) Contribution to the development of a model for the analysis of stocks and flows of waste materials from buildings at a territorial scale. DSc thesis, ETH Zürich, Switzerland.
Titus, K M; Blismas, N; Wakefield, R and Lombardo, R (2011) System archetypes underlying the problematic behaviourof construction activity in Kenya. Construction Management and Economics, 29(1), pp. 3-13. ISSN 1466433X
Tobin, N Y (2017) A framework for knowledge capture and recovery in whole life costing practice. PhD thesis, Robert Gordon University, UK.
Tong, P and Wilhelm, H C (2022) A strategy for integrating hillside dwelling design and automated construction techniques. Smart and Sustainable Built Environment, 11(2), pp. 387-403. ISSN 2046-6099
Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Toussaint, C D (2019) Modes of humanities and social thought in entry level civil engineering. PhD thesis, University of Minnesota, USA.
Townsend, K; Loudoun, R and Markwell, K (2016) The role of line managers in creating and maintaining healthy work environments on project construction sites. Construction Management and Economics, 34(9), pp. 611-621. ISSN 01446193
Tran, V and Tookey, J (2011) Labour productivity in the New Zealand construction industry: A thorough investigation. Construction Economics and Building, 11(1), pp. 41-60. ISSN 2204-9029
Tribelsky, E and Sacks, R (2011) An empirical study of information flows in multidisciplinary civil engineering design teams using lean measures. Architectural Engineering and Design Management, 7(2), pp. 85-101. ISSN 1745-2007
Trigunarsyah, Bambang (2001) Implementing constructability improvement into the Indonesian construction industry. PhD thesis, University of Melbourne, Australia.
Troje, D and Gluch, P (2019) Social procurement in the real world: How employment requirements unfold in construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Tsai, D M and Chiu, H N (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14(4), pp. 325-340. ISSN 01446193
Tsai, S L; Ochiai, C; Tseng, M H and Deng, C Z (2022) Suggestions for large-scale, postdisaster reconstruction involving indigenous populations: A participatory approach to recovery after Typhoon Morakot. International Journal of Disaster Resilience in the Built Environment, 13(2), pp. 180-196. ISSN 1759-5916
Tse, R Y C; Chiang, Y H; Hui, E C M; Raftery, J and Chan, T Y M (2000) Review of construction industry in Asia. Journal of Construction Research, 1(1), pp. 77-86. ISSN 1609-9451
Tse, R Y C and Love, P E D (2003) An economic analysis of the effect of delays on project costs. Journal of Construction Research, 4(2), pp. 155-160. ISSN 1609-9451
Tse, R Y C and Raftery, J (2001) The effects of money supply on construction flows. Construction Management and Economics, 19(1), pp. 9-17. ISSN 01446193
Tsz Wai, C; Wai Yi, P; Ibrahim Olanrewaju, O; Abdelmageed, S; Hussein, M; Tariq, S and Zayed, T (2023) A critical analysis of benefits and challenges of implementing modular integrated construction. International Journal of Construction Management, 23(4), pp. 656-668. ISSN 1562-3599
Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects. PhD thesis, University of California, Berkeley, USA.
Tummalapudi, M; Killingsworth, J; Harper, C and Mehaney, M (2021) US construction industry managerial strategies for economic recession and recovery: A Delphi study. Journal of Construction Engineering and Management, 147(11): 04021146, ISSN 0733-9364
Turkan, Y; Bosché, F; Haas, C T and Haas, R (2014) Tracking of secondary and temporary objects in structural concrete work. Construction Innovation, 14(2), pp. 145-167. ISSN 1471-4175
Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364
Turner, M and Lingard, H (2020) Examining the interaction between bodily pain and mental health of construction workers. Construction Management and Economics, 38(11), pp. 1009-1023. ISSN 01446193
Turner, T J A (2010) The practice of financial project management in the consulting engineering industry. PhD thesis, University of Phoenix, USA.
Tuuli, M M and Rowlinson, S (2009) Performance consequences of psychological empowerment. Journal of Construction Engineering and Management, 135(12), pp. 1334-1347. ISSN 0733-9364
Tyler, J and Singh, A (2011) Enhancing post-earthquake disaster resilience. International Journal of Disaster Resilience in the Built Environment, 2(2), pp. 103-117. ISSN 1759-5916
Uddin, S M J; Albert, A; Pradhananga, N; Ganapati, N E and Prajapati, J (2023) Health and safety challenges among post-disaster reconstruction workers. Construction Economics and Building, 23(1-2), pp. 4-30. ISSN 2204-9029
Ugulu, R A and Allen, S (2018) Using the learning curve theory in the investigation of on-site craft gangs' blockwork construction productivity. Built Environment Project and Asset Management, 8(3), pp. 267-280. ISSN 2044-124X
Ugulu, R A; Arewa, A and Allen, S (2020) Project-specific constraints influencing productivity of tradespeople in the Nigerian construction industry. Built Environment Project and Asset Management, 10(1), pp. 94-109. ISSN 2044-124X
Ugwu, M C (1982) Absenteeism in the construction industry: A diagnostic study. PhD thesis, University of Missouri - Columbia, USA.
Uher, T E and Brand, M C (2008) Claimants' view of the performance of adjudication in New South Wales. Engineering, Construction and Architectural Management, 15(5), pp. 470-484. ISSN 0969-9988
Ulhaq, Irfan (2022) Investigation of knowledge management process within the Vietnamese construction industry. PhD thesis, RMIT University, Australia.
Ullah, F; Olatunji, O and Qayyum, S (2026) A scoping review of green internet of things in construction and smart cities: Current applications, adoption strategies and future directions. Smart and Sustainable Built Environment, 15(1), pp. 294-318. ISSN 2046-6099
Ulubeyli, S; Arslan, V and Kivrak, S (2014) Cartoons on occupational health and safety: Semiotic analysis of workers. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Umair, M; Seo, J; Luo, Y and Ahn, C R (2025) Investigating the impact of virtual reality accident experience on construction workers' risk habituation through individual behaviors. Journal of Construction Engineering and Management, 151(5): 04025032, ISSN 0733-9364
Umar, T (2020) Developing toolkits and guidelines to improve safety performance in the construction industry in Oman. PhD thesis, London South Bank University, UK.
Umeokafor, N (2018) An investigation into public and private clients' attitudes, commitment and impact on construction health and safety in Nigeria. Engineering, Construction and Architectural Management, 25(6), pp. 798-815. ISSN 0969-9988
Umer, Muhammad (2025) Spotting inventory: Autonomous item localization on active construction sites using a boston dynamics spot® with Bayesian filtering and object detection. PhD thesis, Auburn University, USA.
Urushima, A. Y. F. and Yamaguchi, K. (2026) Post-war reconstruction-as-knowledge practice: Fukui's dual disaster recovery. Buildings & Cities, 7(1), pp. 667-682. ISSN 2632-6655
Uwakweh, B O (1985) A conceptual diagnostic manpower planning model for the construction industry in the developing countries. PhD thesis, University of Michigan, USA.
Uwakweh, B O and Maloney, W F (1991) Conceptual model for manpower planning for the construction industry in developing countries. Construction Management and Economics, 9(5), pp. 451-465. ISSN 01446193
Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.
Vahanvati, M; McEvoy, D and Iyer-Raniga, U (2023) Inclusive and resilient shelter guide: Accounting for the needs of informal settlements in Solomon Islands. International Journal of Disaster Resilience in the Built Environment, 14(4), pp. 577-590. ISSN 1759-5916
Valinejadshoubi, M; Sacks, R; Valdivieso, F; Corneau-Gauvin, C and Kaptué, A (2025) Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. Journal of Construction Engineering and Management, 151(11): 05025014, ISSN 0733-9364
Valverde-Gascueña, N; Navarro-Astor, E; Fuentes-del-Burgo, J and Ruiz-Fernandez, J P (2011) Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Van Den Berg, M; Hulsbeek, L and Voordijk, H (2023) Decision-support for selecting demolition waste management strategies. Buildings & Cities, 4(1), pp. 883-901. ISSN 2632-6655
Van Der Heijden, J and Van Bueren, E (2013) Regulating sustainable construction in Europe: An inquiry into the European commission's harmonization attempts. International Journal of Law in the Built Environment, 5(1), pp. 5-20. ISSN 1756-1450
Van Tam, N (2025) Impact of self-efficacy on construction labor productivity: The mediating role of work motivation. Engineering, Construction and Architectural Management, 32(5), pp. 3407-3431. ISSN 0969-9988
Van Timmeren, A and Sidler, D (2007) The sustainable implant: Decentralised sanitation and energy reuse (Desaer) in the built environment. Construction Innovation, 7(1), pp. 22-37. ISSN 1471-4175
Vatterott, A G (2018) A multi-skilled approach to property maintenance considering temporal, spatial and resource constraints. PhD thesis, University of Missouri - Saint Louis, USA.
Venugopal, M (2011) Formal specification of industry foundation class concepts using engineering ontologies. PhD thesis, Georgia Institute of Technology, USA.
Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.
Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988
Vijayenthiran, V.; Perera, B. A. K. S. and Kavirathna, A. S. (2026) Convergence of 3D printing with circular economy to improve the construction sustainability. Smart and Sustainable Built Environment, 15(3), pp. 1026-1046. ISSN 2046-6099
Vilasini, N (2014) Generating value in alliance contracts through the lean concept. PhD thesis, Auckland University of Technology, New Zealand.
Vilasini, N; Neitzert, T and Rotimi, J (2014) Developing and evaluating a framework for process improvement in an alliance project: A New Zealand case study. Construction Management and Economics, 32(6), pp. 625-640. ISSN 01446193
Visscher, H; Suddle, S and Meijer, F (2008) Quantitative risk analysis as a supporting tool for safety protocols at multi-functional urban locations. Construction Innovation, 8(4), pp. 269-279. ISSN 1471-4175
Vogl, B and Abdel-Wahab, M (2015) Measuring the construction industry's productivity performance: Critique of international productivity comparisons at industry level. Journal of Construction Engineering and Management, 141(4): 04014085, ISSN 0733-9364
Vora, C; Aryal, A; Willoughby, S and Wang, C (2024) Investigating stakeholder perception and developing a decision framework for robot adoption in construction. Journal of Construction Engineering and Management, 150(4): 04024012, ISSN 0733-9364
Vorster, M C and Sears, G A (1987) Model for retiring, replacing, or reassigning construction equipment. Journal of Construction Engineering and Management, 113(1), pp. 125-137. ISSN 0733-9364
Vrijhoef, R (2019) Studying time presence on site as an indicator of productive time use by construction workers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Wachira, N; Root, D; Bowen, P and Olima, W (2008) Changing craft skills in the Kenyan construction sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Wadu Mesthrige, J; Lam, P T I; Chiang, Y H and Samarasinghalage, T I (2021) Effectiveness of case-based learning: Views of construction and real estate students. International Journal of Construction Education and Research, 17(4), pp. 318-332. ISSN 1557-8771
Walker, A; Greenwood, D and Johansen, E (2009) The lack of design quality focus in UK construction: A case for examining suitable design processes. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Wall, C M (2004) New ways of building: Architects, operatives and industrialised production in britain 1940-70. PhD thesis, University of Cambridge, UK.
Walsh, K D; Sawhney, A and Bashford, H H (2007) Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), pp. 254-261. ISSN 0733-9364
Wamsler, C and Brink, E (2016) The urban domino effect: A conceptualization of cities' interconnectedness of risk. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 80-113. ISSN 1759-5916
Wamuziri, S (2013) Payment options in collaborative procurement of major construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 12-20. ISSN 17514304
Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wan, M.; Li, L.; Yuan, M. and Yin, X. (2026) Modeling stakeholder-associated risk networks in the life cycle of building-integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(7), pp. 5469-5494. ISSN 0969-9988
Wan, S K M and Kumaraswamy, M M (2009) Industrial management approaches for improving material control in building services works. Engineering, Construction and Architectural Management, 16(3), pp. 208-223. ISSN 0969-9988
Wan, S K M; Kumaraswamy, M M and Liu, D T C (2009) Contributors to construction debris from electrical and mechanical work in Hong Kong infrastructure projects. Journal of Construction Engineering and Management, 135(7), pp. 637-646. ISSN 0733-9364
Wanberg, J; Harper, C; Hallowell, M R and Rajendran, S (2013) Relationship between construction safety and quality performance. Journal of Construction Engineering and Management, 139(10): 04013004, ISSN 0733-9364
Wang, L.; Yuan, J.; Chen, Y.; Wan, X. and Huang, G. (2026) Intelligent construction benefits the public: Evidence from the opinion analysis on social media. Engineering, Construction and Architectural Management, 33(3), pp. 2176-2199. ISSN 0969-9988
Wang, Y; Xiao, B; Mueller, S T and Yi, W (2026) Task–taxon–task framework for modeling and predicting the cognitive impact of collaborative robots on worker performance in modular construction. Journal of Construction Engineering and Management, 152(4): 04026033, ISSN 0733-9364
Wang, C; Li, B; Li, B and Baldwin, A (2017) Case study of "project controlling" on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(6), pp. 862-874. ISSN 0969-9988
Wang, G; Liu, M; Cao, D and Tan, D (2022) Identifying high-frequency–low-severity construction safety risks: An empirical study based on official supervision reports in Shanghai. Engineering, Construction and Architectural Management, 29(2), pp. 940-960. ISSN 0969-9988
Wang, H; Yi, W; Zhen, L; Song, Y and Wu, P (2025) Designing optimal government-contractor subsidy policy for promoting modular construction: Bilevel stochastic program. Journal of Construction Engineering and Management, 151(10): 04025136, ISSN 0733-9364
Wang, J; Shou, W and Wang, X (2015) A framework of total constraint management for improving work flow in liquefied natural gas construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Wang, J Y; Kang, X P and Tam, V W Y (2008) An investigation of construction wastes: An empirical study in Shenzhen. Journal of Engineering, Design and Technology, 6(3), pp. 227-236. ISSN 1726-0531
Wang, L (2018) Deconstructable systems for sustainable design of steel and composite structures. PhD thesis, Northeastern University, USA.
Wang, P; Wu, P; Wang, X; Chen, X and Zhou, T (2020) Developing optimal scaffolding erection through the integration of lean and work posture analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2109-2133. ISSN 0969-9988
Wang, S (2017) Integrated approach and analysis of reliability, robustness, resilience and infrastructure applications. PhD thesis, University of Washington, USA.
Wang, S Q; Dulaimi, M F and Aguria, M Y (2004) Risk management framework for construction projects in developing countries. Construction Management and Economics, 22(3), pp. 237-252. ISSN 01446193
Wang, T and Feng, J (2023) Optimal review strategy for concurrent execution of design-construction tasks in DB mode. Journal of Construction Engineering and Management, 149(1): 04022139, ISSN 0733-9364
Wang, X (2022) Enabling human-robot partnerships in digitally-driven construction work through integration of building information models, interactive virtual reality, and process-level digital twins. PhD thesis, University of Michigan, USA.
Wang, X; Liu, R; Ye, K and Tekka, R S (2020) Modelling the cost of collusion in the construction industry: A case of China. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Wang, X; Shi, L; Wang, B and Kan, M (2020) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(2), pp. 483-501. ISSN 0969-9988
Wang, X; Wang, S and Gao, Y (2023) Optimal equity structure of PPP projects when private-sector shareholders' "investor-contractor" dual roles is considered. Construction Management and Economics, 41(11-12), pp. 910-925. ISSN 01446193
Wang, Y (2017) Zero incident safety management for continued safety improvement. PhD thesis, Polytechnic Institute of New York University, USA.
Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2008) Craft training issues in American industrial and commercial construction. Journal of Construction Engineering and Management, 134(10), pp. 795-803. ISSN 0733-9364
Wang, Y; Thangasamy, V K; Tiong, R L K and Zhang, L (2022) Improved workflow for precast element design based on BIM and lean construction. Journal of Construction Engineering and Management, 148(8): 04022065, ISSN 0733-9364
Wang, Z; Shen, Y and Li, K (2025) Resilience strengthening paths for precast production management in prefabricated construction. Journal of Construction Engineering and Management, 151(8): 04025095, ISSN 0733-9364
Wanigarathna, N; Henjewele, C; Jones, K G; Pascale, F and Morga, M (2022) Modelling earthquake damage repair costs: Improving accuracy for preparedness decision making. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Wanigarathna, N; Xie, Y; Henjewele, C; Morga, M and Jones, K (2025) Machine learning application to disaster damage repair cost modelling of residential buildings. Construction Management and Economics, 43(4), pp. 302-322. ISSN 0144-6193
Ward, P; Sher, W; Gameson, R and Aranda-Mena, G (2007) Innovative protocols and technologies as a means of complying with the building and construction industry security of payments act 1999 (NSW) Australia. Construction Management and Economics, 25(7), pp. 747-763. ISSN 1466433X
Waskett, P R (1999) Management of the building design process with the analytical design planning technique. PhD thesis, Loughborough University, UK.
Watson, N (2016) Developing material selection strategies to improve the embodied impacts of buildings. EngD thesis, University of Bath, UK.
Watson, S V (2010) Pre-disaster planning for transportation infrastructure recovery. PhD thesis, University of Alabama at Birmingham, USA.
Waugh, L M (1990) A construction planner. PhD thesis, Stanford University, USA.
Way, M and Bordass, B (2005) Making feedback and post-occupancy evaluation routine 2: Soft landings: involving design and building teams in improving performance. Building Research & Information, 33(4), pp. 353-360. ISSN 0961-3218
Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531
Weerasuriya, G T; Perera, S and Calheiros, R N (2025) Technological imperatives for issues in the certification of quality, progress, and payments in construction projects: A systematic review. Construction Economics and Building, 25(1), pp. 25-48. ISSN 2204-9029
Welfare, K; Sherratt, F and Hallowell, M (2021) Perceptions of construction work: Views to consider to improve employee recruitment and retention. Journal of Construction Engineering and Management, 147(7): 04021053, ISSN 0733-9364
Welfare, K S (2020) Perceptions of construction and the human factors climate through mixed methods. PhD thesis, University of Colorado at Boulder, USA.
Westerholm, N.; Tuure, A.; Pajunen, S. and Kuittinen, M. (2026) Comparing technical disassembly potential methods for concrete and timber buildings. Buildings & Cities, 7(1), pp. 633-652. ISSN 2632-6655
Westmoreland, G (1979) Electric utilities' accounting for construction work in progress the effects of alternative methods on the financial statements, utility rates and market to book ratio. PhD thesis, University of Florida, USA.
Wetherington, L E (1992) The effect of variations in management techniques on construction productivity. PhD thesis, University of Florida, USA.
Whelton, M G (2004) The development of purpose in the project definition phase of construction projects: Implications for project management. PhD thesis, University of California, Berkeley, USA.
Whelton, M G and Keane, M M (1998) The systematic development of a software environment for building appraisal in the building renovation industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193
White, T; Ariaratnam, S T and Michael, J (2012) Subterranean infrastructure reconnaissance for manmade and natural hazards and disasters. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 66-86. ISSN 1759-5916
Whittaker, J (1987) Equipment rates from revenue requirements. Journal of Construction Engineering and Management, 113(2), pp. 173-178. ISSN 0733-9364
Whyte, J K and Gann, D M (2003) Design quality indicators: Work in progress. Building Research & Information, 31(5), pp. 387-398. ISSN 0961-3218
Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.
Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wijekoon, C; Manewa, A; Ross, A and Davies, C (2016) Evaluating the ability of BIM to enhance value in facilities information management. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Wijewickreme, S P (2016) A framework for providing a lifelong social security system for the operational workforce in the construction industry in Sri Lanka. PhD thesis, University of Salford, UK.
Wilkinson, S; Chang-Richards, A Y; Sapeciay, Z and Costello, S B (2016) Improving construction sector resilience. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 173-185. ISSN 1759-5916
Wilkinson, S; Noktehdan, M; Shahbazpour, M and Cameron, R (2017) Creating an opportunity to innovate during disaster recovery. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Wilkinson, S; Piri, I S and Chang-Rihcards, Y (2017) Developing resilience in subcontracting organisations during disaster recovery. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Wilkinson, S; Potangaroa, R; Cameron, R and Mitansha, M (2024) Improving disaster response: Combining organisational and individual resilience for improved outcomes. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Willar, D; Estrellita Varina Yanti, W; Daisy Debora Grace, P and Rudolf Estephanus Golioth, M (2021) Sustainable construction practices in the execution of infrastructure projects: The extent of implementation. Smart and Sustainable Built Environment, 10(1), pp. 106-124. ISSN 2046-6099
Wimalasena, N N and Gunatilake, S (2018) The readiness of construction contractors and consultants to adopt e-tendering: The case of Sri Lanka. Construction Innovation, 18(3), pp. 350-370. ISSN 1471-4175
Windapo, A; Moghayedi, A; Oliphant, D and Adediran, A (2018) Exploring the components of cost on construction projects. Journal of Construction Business and Management, 2(2), pp. 42-50. ISSN 2521-0165
Wirahadikusumah, R; Abduh, M; Messah, Y and Aulia, M (2021) Introducing sustainability principles into the procurement of construction works–case of Indonesian developers. International Journal of Construction Management, 21(9), pp. 932-944. ISSN 1562-3599
Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.
Wong, J M W; Chan, A P C and Chiang, Y H (2010) Modeling construction occupational demand: Case of Hong Kong. Journal of Construction Engineering and Management, 136(9), pp. 991-1002. ISSN 0733-9364
Wong, J M W; Chan, A P C and Chiang, Y H (2011) Construction manpower demand forecasting: A comparative study of univariate time series, multiple regression and econometric modelling techniques. Engineering, Construction and Architectural Management, 18(1), pp. 7-29. ISSN 0969-9988
Wong, J M W; Chan, A P C and Chiangn, Y H (2006) The changing construction labour market: A case of Hong Kong. Journal of Engineering, Design and Technology, 4(1), pp. 1-17. ISSN 1726-0531
Wong, J M W; Chiang, Y H and Ng, T S (2008) Construction and economic development: The case of Hong Kong. Construction Management and Economics, 26(8), pp. 815-826. ISSN 01446193
Wong, J M W; Kong, H and Chiang, Y H (2004) A critical review of forecasting models to predict manpower demand. Construction Economics and Building, 4(2), pp. 43-56. ISSN 2204-9029
Wong, J M W and Ng, S T (2010) Forecasting construction tender price index inm Hong Kong using vector error correction model. Construction Management and Economics, 28(12), pp. 1255-1268. ISSN 1466433X
Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Woo, Jeyoung (2024) Engineering design quality defects: Causal factors, interactions between causal factors, and mitigation strategies. PhD thesis, University of Texas at Austin, USA.
Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.
Woodhead, W D and Salomonsson, G D (1983) A computer based system for recording and analysing building site labour input. Construction Papers, 2(2), pp. 47-52. ISSN 0144-8587
Worlobah, A M (2025) Investigating the implementation of building information modeling in the construction sector in Liberia. PhD thesis, National University, USA.
Worrall, H; Norman, G and Flanagan, R (1995) Intervention analysis and overseas trade in UK construction-related materials and components. Construction Management and Economics, 13(6), pp. 475-484. ISSN 01446193
Wu, G; Zhang, H; Sun, J and Yu, T (2023) Comparative analysis on rheological characteristics of different modified asphalt based on dsr and bbr evaluation. Journal of Engineering, Design and Technology, 21(5), pp. 1568-1587. ISSN 1726-0531
Wu, H; Han, Y; Zhang, M; Abebe, B D; Legesse, M B and Jin, R (2023) Identifying unsafe behavior of construction workers: A dynamic approach combining skeleton information and spatiotemporal features. Journal of Construction Engineering and Management, 149(11): 04023115, ISSN 0733-9364
Wu, W; Sandoval, A; Gunji, V; Ayer, S K; London, J; Perry, L; Patil, K and Smith, K (2020) Comparing traditional and mixed reality-facilitated apprenticeship learning in a wood-frame construction lab. Journal of Construction Engineering and Management, 146(12): 04020139, ISSN 0733-9364
Wuni, I Y; Shen, G Q and Saka, A B (2023) Computing the severities of critical onsite assembly risk factors for modular integrated construction projects. Engineering, Construction and Architectural Management, 30(5), pp. 1864-1882. ISSN 0969-9988
Xiao, H.; Proverbs, D. G.; Joseph, R. and Adedeji, T. (2026) Property flood resilience (PFR): Exploring the experiences of commercial property owners. International Journal of Building Pathology and Adaptation, 44(4), pp. 935-949. ISSN 2398-4708
Xiao, L.; Fan, P.; Shen, G. Q.; Ma, G.; Jia, J. and Zheng, X. (2026) Leveraging deep reinforcement learning to facilitate the transition from knowledge diversity to knowledge creation in construction project teams. Journal of Construction Engineering and Management, 152(10): 04026175, ISSN 0733-9364
Xiao, Bo (2021) Deep learning-based framework of summarizing construction videos for vision-based monitoring of construction sites. PhD thesis, University of Alberta, Canada.
Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 0969-9988
Xiao, Xue (2021) Improving the long-term use of case-based reasoning model in early construction cost estimation. PhD thesis, Queensland University of Technology, Australia.
Xie, H; Hong, Y; Xin, M; Brilakis, I and Shi, O (2025) Identification and analysis of communication barriers for construction projects with time uncertainties. Engineering, Construction and Architectural Management, 32(1), pp. 305-331. ISSN 0969-9988
Xie, L L; Chen, Y; Wu, S; Chang, R D and Han, Y (2024) Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(7), pp. 2852-2877. ISSN 0969-9988
Xu, Q; Hwang, B G; Choo, R Q; Zheng, X; Kong, L; Wang, Q C and Liu, X (2023) Comparison of construction project risks before and during COVID-19 in Singapore: Criticality and management strategies. Construction Management and Economics, 41(10), pp. 875-891. ISSN 01446193
Xu, Yuqing (2025) Enhancing reliability and efficiency of upfront embodied carbon assessment leveraging openbim, llm, DES, and blockchain. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Yahya, K and Boussabaine, H (2010) Quantifying environmental impacts and eco-costs from brick waste. Architectural Engineering and Design Management, 6(3), pp. 189-206. ISSN 1745-2007
Yakın, Ö and Güncü, A. (2026) Post-disaster housing recovery models in Turkey: A case study of the 2020 İzmir seferihisar earthquake. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 239-257. ISSN 1759-5908
Yan, H; Liu, C; Yang, X and Feng, K (2025) Real-time digital twin-driven 3D near-miss detection system at construction sites. Journal of Construction Engineering and Management, 151(4): 04025021, ISSN 0733-9364
Yang, F (2022) Ascending the pagoda: A ground-up exploration of the ancient construction methods of dayanta using virtual reality. PhD thesis, Ohio State University, USA.
Yang, J (2001) A decision support system for material routing in construction sites. PhD thesis, University of Wolverhampton, UK.
Yang, J and Price, A D F (2006) Innovative design and construction solutions for improved therapeutic healing environments. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Yang, J; Wu, Y and Li, D (2024) Block planning based on grid's topology for the dismantling of long-span spatial lattice structures. Journal of Construction Engineering and Management, 150(9): 04024118, ISSN 0733-9364
Yang, J B and Chen, Y F (2025) S-curve adjustment approaches for a force majeure event: COVID-19 as an example. Engineering, Construction and Architectural Management, 32(3), pp. 1621-1642. ISSN 0969-9988
Yang, K (2018) Sensing workers' responsive behaviors for identifying safety hazards in construction. PhD thesis, University of Nebraska - Lincoln, USA.
Yang, L; Lv, X and Zhao, X (2024) Coping with abnormal organizational behaviors in complex project based on network attack theory. Engineering, Construction and Architectural Management, 31(9), pp. 3773-3800. ISSN 0969-9988
Yang, M L; Chen, S J and Chen, S T (2006) Innovative central opening strut system for foundation excavation. Journal of Construction Engineering and Management, 132(1), pp. 58-66. ISSN 0733-9364
Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364
Yang, W; Firouzi, A and Li, C Q (2023) Risk transfer in project finance loans for toll road using credit default swaps. Journal of Financial Management of Property and Construction, 28(1), pp. 1-21. ISSN 1366-4387
Yang, Y (2020) An integrated infrastructure asset management model to improve the resilience of high-density cities. PhD thesis, University of Hong Kong, Hong Kong.
Yang, Y; Li, Y; Kral, K; Hupert, N and Dogan, T (2021) Urban design attributes and resilience: COVID-19 evidence from New York city. Buildings & Cities, 2(1), pp. 618-636. ISSN 2632-6655
Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(6): 04024048, ISSN 0733-9364
Yap, J B H; Low, P L and Wang, C (2017) Rework in Malaysian building construction: Impacts, causes and potential solutions. Journal of Engineering, Design and Technology, 15(5), pp. 591-618.
Yap, J B H; Rou Chong, J; Skitmore, M and Lee, W P (2020) Rework causation that undermines safety performance during production in construction. Journal of Construction Engineering and Management, 146(9): 04020106, ISSN 0733-9364
Yap, J B H and Shavarebi, K (2022) Enhancing project delivery performances in construction through experiential learning and personal constructs: Competency development. International Journal of Construction Management, 22(3), pp. 436-452. ISSN 1562-3599
Yasin, M F (2005) A taxonomy and analysis of the relationship between changes in material technology and construction productivity. PhD thesis, University of Kentucky, USA.
Yazdisamadi, M (2024) Accelerating restoration through information-sharing: Understanding operator behavior for improved management of interdependent infrastructure. PhD thesis, University of Maryland, College Park, USA.
Yean Yng Ling, F; Ming Hsia Ang, A and su yu Lim, S (2007) Encounters between foreigners and Chinese: Perception and management of cultural differences. Engineering, Construction and Architectural Management, 14(6), pp. 501-518. ISSN 0969-9988
Yeung, J F Y; Chan, A P C and Chan, D W M (2008) Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(3), pp. 277-301. ISSN 1466433X
Yi, Yanqing (2025) New model for integration life cycle assessment and system dynamics to support the process of construction and demolition waste management. PhD thesis, Università degli Studi di Padova, Italy.
Yin, Z and Caldas, C (2022) Scaffolding in industrial construction projects: Current practices, issues, and potential solutions. International Journal of Construction Management, 22(13), pp. 2554-2563. ISSN 1562-3599
Ying, F; Tookey, J and Roberti, J (2014) Addressing effective construction logistics through the lens of vehicle movements. Engineering, Construction and Architectural Management, 21(3), pp. 261-275. ISSN 0969-9988
Ying, F J; O'Sullivan, M and Adan, I (2021) Simulation of vehicle movements for planning construction logistics centres. Construction Innovation, 21(4), pp. 608-624. ISSN 1471-4175
Yiu, C Y; Lu, X H; Leung, M Y and Jin, W X (2004) A longitudinal analysis on the relationship between construction output and GDP in Hong Kong. Construction Management and Economics, 22(4), pp. 339-345. ISSN 01446193
Yonat, N; Isaac, S and Shohet, I M (2025) Complex infrastructure systems analysis and management: The theory of faults. Smart and Sustainable Built Environment, 14(3), pp. 599-624. ISSN 2046-6099
Younes, B (2013) A framework for invoice management in construction. PhD thesis, University of Alberta, Canada.
Young, T; Hunter, J A; Bentley, S V; Millear, P; Alexander Haslam, S and Haslam, C (2025) A social identity intervention to improve mental health in construction workers. Journal of Construction Engineering and Management, 151(7): 04025072, ISSN 0733-9364
Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity. PhD thesis, University College London, UK.
Yu, M K W and Ive, G (2011) Orders and output in UK construction statistics: New methodology and old problems. Construction Management and Economics, 29(7), pp. 653-658. ISSN 1466433X
Yu, W D and Lo, S S (2005) Time-dependent construction social costs model. Construction Management and Economics, 23(3), pp. 327-337. ISSN 01446193
Yuan, C; McClure, T; Cai, H and Dunston, P S (2017) Life-cycle approach to collecting, managing, and sharing transportation infrastructure asset data. Journal of Construction Engineering and Management, 143(6): 04017001, ISSN 0733-9364
Yuan, H and Shen, X (2024) Optimizing floor plans of accessible restrooms in elderly long-term care facilities: a path planning approach. Architectural Engineering and Design Management, 20(4), pp. 891-910. ISSN 1745-2007
Yuan, L (2006) Biomechanical analysis of the physical loads on the low back and shoulder during drywall installation. ScD thesis, University of Massachusetts Lowell, USA.
Yuan, X (2016) A cyber-physical systems (CPS) approach to temporary structures monitoring. PhD thesis, Pennsylvania State University, USA.
Yung, P. and Blacker, S. (2026) Macroeconomic determinants of individual construction trader bankruptcy in the UK. Construction Management and Economics, 44(9), pp. 653-673. ISSN 0144-6193
Yung, P.; Saka, A. B. and Caborn, S. E. (2025) A macroeconomic analysis of insolvency in the UK construction industry. Engineering, Construction and Architectural Management, 33(5), pp. 3457-3484. ISSN 0969-9988
Zaalouk, A and Han, S (2021) Parameterized design optimization framework for worker-friendly workplaces in modular construction. Journal of Construction Engineering and Management, 147(5): 04021030, ISSN 0733-9364
Zainuddin, F K and Mustapa, F D (2024) Transaction cost economics framework development for Malaysian housing development. Journal of Construction in Developing Countries, 29(2), pp. 77-105. ISSN 1823-6499
Zakeri, M (1996) An evaluation of productivity and management practice in the Iranian construction industry. PhD thesis, University of Wolverhampton, UK.
Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.
Zanni, M A (2017) Communication of sustainability information and assessment within BIM-enabled collaborative environment. PhD thesis, Loughborough University, UK.
Zapata Quimbayo, C A and Mejía Vega, C A (2023) Credit risk in infrastructure PPP projects under the real options approach. Construction Management and Economics, 41(4), pp. 293-306. ISSN 01446193
Zaray, A H; Hasan, A; Johari, S; Hashmat, P A and Jha, K N (2023) Client and contractor perspectives on attributes affecting construction quality in a war-affected region. Engineering, Construction and Architectural Management, 30(10), pp. 4762-4781. ISSN 0969-9988
Zarei, F; Arashpour, M; Mirnezami, S A; Shahabi-Shahamiri, R and Ghasemi, M (2024) Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study. International Journal of Construction Management, 24(8), pp. 820-833. ISSN 1562-3599
Zayed, T M (2001) Assessment of productivity for concrete bored pile construction. PhD thesis, Purdue University, USA.
Zayed, T M and Halpin, D W (2004) Process versus data oriented techniques in pile construction productivity assessment. Journal of Construction Engineering and Management, 130(4), pp. 490-499. ISSN 0733-9364
Zayed, T M and Halpin, D W (2004) Quantitative assessment for piles productivity factors. Journal of Construction Engineering and Management, 130(3), pp. 405-414. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Pile construction productivity assessment. Journal of Construction Engineering and Management, 131(6), pp. 705-714. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364
Zeng, N; Liu, Y; Wang, C; Chen, Q; Liu, Y and Li, Q (2026) On- and off-site coordination in a modular construction supply chain: Domain-spanning production flow framing and evaluation. Journal of Construction Engineering and Management, 152(2): 04025245, ISSN 0733-9364
Zeng, C S (2025) Decision under intensity-based costs in large-scale systems. PhD thesis, Princeton University, USA.
Zeng, N; Liu, Y and König, M (2023) 4D BIM-enabled look-ahead scheduling for early warning of off-site supply chain disruptions. Journal of Construction Engineering and Management, 149(1): 04022154, ISSN 0733-9364
Zerihun, A; Beza, D and Idrisi, M J (2025) Factors affecting contractor and subcontractor relationship and their effects on building project performance: Case of Addis Ababa. International Journal of Construction Management, 25(14), pp. 1716-1724. ISSN 1562-3599
Zerjav, V and Ceric, A (2009) Structuring communication within construction projects: A communication breakdown structure. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Zhai, D (2010) The relationship between information technology and construction productivity. PhD thesis, University of Kentucky, USA.
Zhai, D; Goodrum, P M; Haas, C T and Caldas, C H (2009) Relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering and Management, 135(8), pp. 746-753. ISSN 0733-9364
Zhairy, A. E.; Daoud, A. O. and Mohamed, A. G. (2026) Transforming facility management with BIM, IoT, and digital twin: A data-driven approach to air quality monitoring. Architectural Engineering and Design Management, 22(2), pp. 426-445. ISSN 1745-2007
Zhan, W and Pan, W (2020) Formulating systemic construction productivity enhancement strategies. Journal of Construction Engineering and Management, 146(8): 05020008, ISSN 0733-9364
Zhang, J.; Wang, Y.; Wang, R. D.; Li, X.; Zhang, Z. and Yang, Z. (2026) A multitower crane layout planning framework for modular integrated construction considering material relay handling. Journal of Construction Engineering and Management, 152(8): 04026109, ISSN 0733-9364
Zhang, D; Haas, C T; Goodrum, P M; Caldas, C H and Granger, R (2012) Construction small-projects rework reduction for capital facilities. Journal of Construction Engineering and Management, 138(12), pp. 1377-1385. ISSN 0733-9364
Zhang, H; Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(2), pp. 159-169. ISSN 01446193
Zhang, H and Tam, C M (2003) Fuzzy decision-making for dynamic resource allocation. Construction Management and Economics, 21(1), pp. 31-41. ISSN 01446193
Zhang, J; Eastham, D L and Bernold, L E (2005) Waste-based management in residential construction. Journal of Construction Engineering and Management, 131(4), pp. 423-430. ISSN 0733-9364
Zhang, P (2011) Analysis of factors affecting individual knowledge sharing behavior inconstruction teams in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Zhang, P; Lingard, H; Blismas, N; Wakefield, R and Kleiner, B (2015) Work-health and safety-risk perceptions of construction-industry stakeholders using photograph-based q methodology. Journal of Construction Engineering and Management, 141(5): 04014093, ISSN 0733-9364
Zhang, Q W; Liao, P C; Liang, M and Chan, A P C (2024) Critical factors influencing learning from quality failures in the construction of grid infrastructure. Engineering, Construction and Architectural Management, 31(4), pp. 1730-1750. ISSN 0969-9988
Zhang, R; Chen, L and Sun, X (2024) The impact of COVID-19 on the financial performance of the UK construction firms. Construction Management and Economics, 42(10), pp. 867-885. ISSN 01446193
Zhang, R P; Lingard, H and Oswald, D (2020) Impact of supervisory safety communication on safety climate and behavior in construction workgroups. Journal of Construction Engineering and Management, 146(8): 0001881, ISSN 0733-9364
Zhang, S (2022) The development of a low carbon prefabricated house. PhD thesis, University of Nottingham, UK.
Zhang, S; Duan, H; Zhao, X; Xia, B; Feng, Y and Galvin, S (2021) Learning on rework management of construction projects: A case study. International Journal of Construction Management, 21(3), pp. 246-260. ISSN 1562-3599
Zhang, S B and Liu, A M M (2006) Organisational culture profiles of construction enterprises in China. Construction Management and Economics, 24(8), pp. 817-828. ISSN 1466433X
Zhang, W (2021) Construction productivity improvement through industrialized construction methods. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Zhang, X; Azhar, S; Nadeem, A and Khalfan, M (2018) Using building information modelling to achieve lean principles by improving efficiency of work teams. International Journal of Construction Management, 18(4), pp. 293-300. ISSN 1562-3599
Zhang, Y; Luo, H; Skitmore, M; Li, Q and Zhong, B (2018) Optimal camera placement for monitoring safety in metro station construction work. Journal of Construction Engineering and Management, 145(1): 04018118, ISSN 0733-9364
Zhang, Z and Lee, J D (2023) Decision-making analysis for Pittsburgh's deconstruction pilot using AHP and GIS. Buildings & Cities, 4(1), pp. 292-314. ISSN 2632-6655
Zhao, D (2015) Exploring construction safety and control measures through electrical fatalities. PhD thesis, Virginia Tech, USA.
Zhao, T and Dungan, J M (2014) Improved baseline method to calculate lost construction productivity. Journal of Construction Engineering and Management, 140(2): 06013006, ISSN 0733-9364
Zhao, X; Hwang, B G and Lee, H N (2016) Identifying critical leadership styles of project managers for green building projects. International Journal of Construction Management, 16(2), pp. 150-160. ISSN 1562-3599
Zhao, Z Y; Lv, Q L; Zuo, J and Zillante, G (2010) Prediction system for change management in construction project. Journal of Construction Engineering and Management, 136(6), pp. 659-669. ISSN 0733-9364
Zhao, Z Y; You, W Y and Zuo, J (2010) Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. Journal of Construction Engineering and Management, 136(9), pp. 1056-1060. ISSN 0733-9364
Zheng, W.; Huang, Y. and Huang, W. (2026) Data-driven analysis of key factors in building fire risk. Engineering, Construction and Architectural Management, pp. 1-29. ISSN 0969-9988
Zheng, X; Chau, K W and Hui, E C M (2012) The impact of property price on construction output. Construction Management and Economics, 30(12), pp. 1025-1037. ISSN 1466433X
Zhong, B; Li, H; Luo, H; Zhou, J; Fang, W and Xing, X (2020) Ontology-based semantic modeling of knowledge in construction: Classification and identification of hazards implied in images. Journal of Construction Engineering and Management, 146(4): 04020013, ISSN 0733-9364
Zhou, Z; Xie, Y; Zhou, L and Zhang, Z (2026) Risk factor analysis of crane accidents based on HFACS in the construction industry. Journal of Construction Engineering and Management, 152(5): 04026036, ISSN 0733-9364
Zhu, M; Guo, S; Zeng, L; Zhang, P; Duan, H and Yue, C (2025) BIM-based base position optimization of mobile construction robots for bricklaying task. Architectural Engineering and Design Management, 21(3), pp. 513-532. ISSN 1745-2007
Zhu, X (2023) Machine learning supported multiple criteria decision making for project delivery system selection. PhD thesis, Queen's University Belfast, UK.
Zou, P X W and Zhang, G (2009) Comparative study on the perception of construction safety risks in China and Australia. Journal of Construction Engineering and Management, 135(7), pp. 620-627. ISSN 0733-9364
Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988
Zughaibi, A M (1987) Construction productivity in Saudi Arabia: The influence of multinational labor force. PhD thesis, University of Texas at Austin, USA.
Zulu, S L; Saad, A M; Ajayi, S O; Dulaimi, M and Unuigbe, M (2024) Digital leadership enactment in the construction industry: Barriers undermining effective transformation. Engineering, Construction and Architectural Management, 31(10), pp. 4062-4078. ISSN 0969-9988
Zuniga-Garcia, N; Machemehl, R B; Khwaja, N A; Pruner, K D and Fu, M (2021) Estimation of road user costs for work zones in data-limited or time-constrained environments. Journal of Construction Engineering and Management, 147(3): 04020182, ISSN 0733-9364
de Souza, L. P.; Melo, A. P.; Triana, M. A. and Lamberts, R. (2026) Thermal resilience and life cycle assessment of social housing: A discussion about limitations in Brazil. Architectural Engineering and Design Management, 22(2), pp. 382-401. ISSN 1745-2007
de Valence, Gerard (2001) Construction deflators and measurement of output. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
do Amaral, R; de Lima Bezerra, M C and de Mello Baptista, G M (2024) Landscape planning and design by identifying areas for ecological restoration based on carbon fluxes. International Journal of Building Pathology and Adaptation, 42(2), pp. 318-335. ISSN 23984708
e Silva, H B G (2024) Mitigating information asymmetry in the 5g era: Unveiling practices that restrict users' internet access. PhD thesis, Universidade do Porto, Portugal.
li, H; Chen, Z; Wong, C T C and Love, P E D (2002) A quantitative approach to construction pollution control based on resource levelling. Construction Innovation, 2(2), pp. 71-81. ISSN 1471-4175
ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175
olde Scholtenhuis, Léon Luc (2015) Enhancing mindful coordination in fragmented utility construction practices: By developing, implementing and evaluating virtual design and construction models. PhD thesis, University of Twente, Netherlands.
Çınar, S (2020) Construction labour, subcontracting and masculinity: "Construction is a man's job". Construction Management and Economics, 38(3), pp. 275-290. ISSN 01446193
Ó Murchadha, E and Murphy, R (2016) Rethinking apprenticeship training for the construction industry in Ireland. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Up a level