Items with Subject: measurement and scaling
Abadi, A A; Poerbo, H W; Yuwono, T and Isnandya, A R (2024) Balancing Act: Promoting Affordable Housing in Jakarta's Transit-Oriented Development through Public-Private Partnership. Journal of Construction in Developing Countries, 29(S1), pp. 287-314. ISSN 1823-6499
Abdel-Hamid, M and Abdelhaleem, H M (2023) Project cost control using five dimensions building information modelling. International Journal of Construction Management, 23(3), pp. 405-409. ISSN 1562-3599
Abdel-Wahab, M S; Moore, D R; Gibbons-Woods, D; Kearny, G and Pirie, T (2009) An evaluation framework for training: A case study in the northeast of scotland. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Abdelaal, A; Ma, J; Zhang, H; Shobeiri, V and Xie, Y M (2026) Bio-stabilized modular rammed earth blocks for sustainable and aesthetic construction. Construction Innovation, 26(9), pp. 1-20. ISSN 1471-4175
Abedmousa, M (2023) Reframing construction labour productivity in a colonisation context: the West Bank as an example. PhD thesis, University of Westminster, UK.
Abourizk, S M; Halpin, D W and Wilson, J R (1991) Visual interactive fitting of beta distributions. Journal of Construction Engineering and Management, 117(4), pp. 589-605. ISSN 0733-9364
Abu El-Maaty, A E; El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(5), pp. 809-827. ISSN 0969-9988
Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria. PhD thesis, University of California, Berkeley, USA.
Abu-Hijleh, S F and Ibbs, C W (1993) Systematic automated management exception reporting. Journal of Construction Engineering and Management, 119(1), pp. 87-104. ISSN 0733-9364
Abujnah, M S (2010) Towards a risk management framework for Libyan house-building projects. PhD thesis, University of Salford, UK.
Adafin, J; Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(1), pp. 13-28. ISSN 1562-3599
Adafin, J; Rotimi, J O B; Wilkinson, S and Mbachu, J (2019) An assessment of risk factors impacting budget variability in New Zealand commercial construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Adam, V; Manu, P; Mahamadu, A M; Dziekonski, K; Kissi, E; Emuze, F and Lee, S (2022) Building information modelling (BIM) readiness of construction professionals: The context of the Seychelles construction industry. Journal of Engineering, Design and Technology, 20(3), pp. 823-840. ISSN 1726-0531
Adams, J D and Brown, A W (2002) Project management in public sector construction projects: Assessing value for money. Journal of Construction Procurement, 8(2), pp. 84-100. ISSN 1358-9180
Adamtey, S (2021) Cost and time performance analysis of progressive design-build projects. Journal of Engineering, Design and Technology, 19(3), pp. 686-697. ISSN 1726-0531
Adamy, A and Abu Bakar, A H (2021) Developing a building-performance evaluation framework for post-disaster reconstruction: The case of hospital buildings in Aceh, Indonesia. International Journal of Construction Management, 21(1), pp. 56-77. ISSN 1562-3599
Addy, M N; Akunyumu, S and Simons, B (2019) Key risk factors affecting renewable energy independent power producer (IPP) set-up projects in developing countries: The case of Ghana. Journal of Engineering, Design and Technology, 17(6), pp. 1340-1355. ISSN 1726-0531
Ade-Ojo, O C (2022) Awareness of the LEED requirements for green housing development among built-environment professionals in Nigeria. Built Environment Project and Asset Management, 12(4), pp. 521-536. ISSN 2044-124X
Adebayo, S O (1991) A study of the maintenance management of public buildings in Nigeria. PhD thesis, University of Lagos, Nigeria.
Adebowale, O J (2018) A multi-stakeholder approach to productivity improvement in the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.
Adedeji, T; Proverbs, D G; Xiao, H and Oladokun, V O (2024) Measuring property flood resilience (PFR) in UK homes. International Journal of Building Pathology and Adaptation, 42(6), pp. 1328-1349. ISSN 2398-4708
Adedokun, O A; Egbelakin, T; Adedokun, D O and Adafin, J (2023) Success criteria-based impacts of risk factors on education building projects in Southwestern Nigeria. Journal of Engineering, Design and Technology, 21(6), pp. 1901-1924. ISSN 1726-0531
Adekunle, T O (2015) Thermal performance of low-carbon prefabricated timber housing in the UK. PhD thesis, University of Kent, UK.
Adeniyi, O; Thurairajah, N and Leo-Olagbaye, F (2024) Rethinking digital construction: A study of BIM uptake capability in BIM infant construction industries. Construction Innovation, 24(2), pp. 584-605. ISSN 1471-4175
Adenuga, O A (2008) Evaluation of maintenance management practice in public hospital, buildings in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.
Adewunmi, Y; Omirin, M and Koleoso, H (2016) Prioritising facilities management services for benchmarking in selected cities in Nigeria. Journal of Construction in Developing Countries, 21(1), pp. 131-145. ISSN 1823-6499
Adukpo, Emmanuel Selorm (2018) The development of governance capabilities for project owners and operators : a dynamic capabilities perspective. PhD thesis, University of Hong Kong, Hong Kong.
Afieroho, P (2024) Project management by the people, for the people, and of the people: Context, challenges, and prospects for adoption of e-government tools to monitor execution of public infrastructure projects in Nigeria. PhD thesis, University of Alaska Fairbanks, USA.
Afolabi, A; Oyeyipo, O; Ojelabi, R and Patience, T O (2019) Balancing the female identity in the construction industry. Journal of Construction in Developing Countries, 24(2), pp. 83-104. ISSN 1823-6499
Afolabi, A O; Oluwatayo, A; Oyeyipo, O; Ojelabi, R and Fagbenle, O (2018) Assessment of designers' perception of post conflict housing schemes for internally displaced persons. Construction Economics and Building, 18(1), pp. 27-47. ISSN 2204-9029
Afolabi, A O; Tunji-Olayeni, P F; Oyeyipo, O O and Ojelabi, R A (2017) The socio-economics of women inclusion in green construction. Construction Economics and Building, 17(1), pp. 70-89. ISSN 2204-9029
Agbo, E A; Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), pp. 109-125. ISSN 1823-6499
Agumba, J N (2013) A construction health and safety performance improvement model for South African small and medium enterprises. PhD thesis, University of Johannesburg, South Africa.
Agyakwa-Baah, A and Chileshe, N (2010) Construction professionals perception of risk assesssment and management practices: Does length of service in construction industry matter. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Agyekum, K; Amudjie, J; Pittri, H; Dompey, A M A and Botchway, E A (2024) Prioritizing the principles of circular economy among built environment professionals. Built Environment Project and Asset Management, 14(5), pp. 734-750. ISSN 2044-124X
Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.
Ahankoob, A; Manley, K and Abbasnejad, B (2022) The role of contractors' building information modelling (BIM) experience in realising the potential values of BIM. International Journal of Construction Management, 22(4), pp. 588-599. ISSN 1562-3599
Ahankoob, A; Manley, K; Hon, C and Drogemuller, R (2018) The impact of building information modelling (BIM) maturity and experience on contractor absorptive capacity. Architectural Engineering and Design Management, 14(5), pp. 363-380. ISSN 1745-2007
Ahmad, A H (2008) Private housing development: refining rational choice. PhD thesis, University College London, UK.
Aidoo, I; Fugar, F; Adinyira, E and Ansah, N B (2023) Assessing the level of resilience in construction safety management systems in the Ghanaian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 217-242. ISSN 1823-6499
Aje, I (2012) The impact of contractors' prequalification on construction project delivery in Nigeria. Engineering, Construction and Architectural Management, 19(2), pp. 159-172. ISSN 0969-9988
Aje, O I; Ogunsemi, D R and Odusami, K T (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(2), pp. 171-187. ISSN 1366-4387
Akindele, M A (2024) Development and evaluation of portable reduced-complexity air quality models for policy assessment in Africa. PhD thesis, Carnegie Mellon University, USA.
Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193
Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(2), pp. 161-172. ISSN 01446193
Akintoye, A and Main, J (2007) Collaborative relationships in construction: The UK contractors' perception. Engineering, Construction and Architectural Management, 14(6), pp. 597-617. ISSN 0969-9988
Al Awad, O S (2015) The uptake of advanced IT with specific emphasis on BIM by SMEs in the Jordanian construction industry. PhD thesis, University of Salford, UK.
Al-Hashimy, H. N. H.; Yao, J.; Pitchay, A. A. and Hussein, W. N. (2026) Linking computerised accounting information systems to innovation, resilience and performance in construction projects. Engineering, Construction and Architectural Management, pp. 1-21. ISSN 0969-9988
Al-Kayed, A. A.; Rotimi, F. E.; Purushothaman, M. B.; Pawley, M. and Ghaffarian Hoseini, A. (2026) Modelling the enablers of effective digital technology implementation for competitiveness enhancement among subcontracting organisations in new zealand's residential construction industry. Journal of Engineering, Design and Technology, 24(4), pp. 894-919. ISSN 1726-0531
Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599
Al-Mhdawi, M K S; Brito, M; Onggo, B S; Qazi, A; O'Connor, A and Namian, M (2023) Construction risk management in Iraq during the COVID-19 pandemic: Challenges to implementation and efficacy of practices. Journal of Construction Engineering and Management, 149(9): 04023086, ISSN 0733-9364
Al-Sibaie, E Z; Alashwal, A M; Abdul-Rahman, H and Zolkafli, U K (2014) Determining the relationship between conflict factors and performance of international construction projects. Engineering, Construction and Architectural Management, 21(4), pp. 369-382. ISSN 0969-9988
Al-Tabtabai, H (1992) Judgemental forecasting in construction projects. Construction Management and Economics, 10(1), pp. 19-30. ISSN 01446193
Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988
Al-Tabtabai, H M and Thomas, V P (2004) Negotiation and resolution of conflict using AHP: An application to project management. Engineering, Construction and Architectural Management, 11(2), pp. 90-100. ISSN 0969-9988
Alaboud, N S M (2016) Development of a framework to enhance communication practice for site-based construction workers in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.
Alam, A; Bhat, M S; Farooq, H; Ahmad, B; Ahmad, S and Sheikh, A H (2018) Flood risk assessment of srinagar city in Jammu and Kashmir, India. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 114-129. ISSN 1759-5916
Alam, Shafiqul (2016) Developing life cycle environmental indicators for road infrastructure. PhD thesis, Queensland University of Technology, Australia.
Alamri, R (2019) Development of a model for health and safety management in Saudi Arabian oil and gas construction projects. PhD thesis, University of Wolverhampton, UK.
Alashwal, N and Alashwal, A (2023) Rural access programs in Yemen: Delay of international funded road projects. Engineering, Construction and Architectural Management, 30(4), pp. 1746-1767. ISSN 0969-9988
Alblooshi, M (2021) Exploring the influence of management style on job satisfaction: The case of construction companies in Abu Dhabi, the United Arab Emirates (UAE). PhD thesis, Liverpool John Moores University, UK.
Aldaiyat, R M R E (2017) Perception eccentricities in risk time dimension of construction professionals in the state of Kuwait. PhD thesis, Loughborough University, UK.
Aleithawe, I (2010) Acquisition of right of way for highway construction. PhD thesis, Mississippi State University, USA.
Aleithawe, I; Sinno, R R and McAnally, W H (2012) Right-of-way acquisition duration prediction model for highway construction projects. Journal of Construction Engineering and Management, 138(4), pp. 540-544. ISSN 0733-9364
Alhasan, S; Amoudi, O; Tong, M and Kumar, B (2019) Effectiveness of adopting BIM on quantity surveying profession during the project life cycle. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Ali, S A A; Arun, C and Krishnamurthy, K (2021) Re-defining flow in construction process for facilitating the identification and quantification of generic overruns existing in construction industry today. International Journal of Construction Management, 21(2), pp. 113-130. ISSN 1562-3599
Aljarman, M (2016) Emerging risk from the application of building information modelling through the life cycle of projects. PhD thesis, University of Liverpool, UK.
Alkaissy, Maryam (2022) Worksite accidents quantification in construction: Safety relations with project performance metrics. PhD thesis, Monash University, Australia.
Alkhathami, M M (2004) Examination of the correlation of critical success and delay factors in construction projects in the kingdom of Saudi Arabia. PhD thesis, University of Pittsburgh, USA.
Allam, A; Elbeltagi, E; Abouelsaad, M N and E. El Madawy, M (2026) Integrated BIM-GA approach for slab formwork design optimization. Construction Innovation, 26(2), pp. 631-651. ISSN 1471-4175
Almahmoud, Essam (2014) Social sustainability health check: A model for evaluating and optimising social value creation in construction projects. PhD thesis, University of Melbourne, Australia.
Almarri, K; Aljarman, M and Boussabaine, H (2019) Emerging contractual and legal risks from the application of building information modelling. Engineering, Construction and Architectural Management, 26(10), pp. 2307-2325. ISSN 0969-9988
Almazrouei, M; Khalid, K and Davidson, R (2021) Safety climate of UAE petroleum industry: a cross-validation using confirmatory factor analytic approach. Journal of Engineering, Design and Technology, 19(4), pp. 943-965. ISSN 1726-0531
Alnsour, J A M (2006) Planning and managing the built environment in the context of compliance with residential standards in Jordan. PhD thesis, University of Huddersfield, UK.
Alrefaie, A M; Abdul-Samad, Z; Salleh, H; Alashwal, A M and Amos, D (2023) Modelling labour productivity of reinforcement bar using polynomial regression: A study on a tropical country's weather. International Journal of Construction Management, 23(10), pp. 1633-1641. ISSN 1562-3599
Alshihre, F (2018) Development of a framework for client satisfaction in the Saudi construction industry. PhD thesis, University of Wolverhampton, UK.
Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.
Alsulamy, S (2015) Developing a performance measurement framework for municipal construction projects in Saudi Arabia. PhD thesis, Edinburgh Napier University, UK.
Altoryman, A (2014) Identification and assessment of risk factors affecting construction projects in the gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.
Altoryman, A S (2014) Identification and assessment of risk factors affecting construction projects in the Gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.
Alutaibi, A (2018) The impact of facility management practices on tenant satisfaction forresidential complexes in the Kingdom of Saudi Arabiaresidential complexes in the Kingdom of Saudi Arabia. PhD thesis, Loughborough University, UK.
Amadi, A and Higham, A (2016) Geotechnical characterization of cost overrun drivers in highway projects: Predicated on heterogeneous ground conditions in the Niger delta region of Nigeria. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.
Amadi, A I (2021) A back-end view to climatic adaptation: Partitioning weather-induced cement demand variance in wet humid environment. International Journal of Building Pathology and Adaptation, 39(2), pp. 153-174. ISSN 23984708
Amarah, Burhan (2016) Development of a triple bottom line stakeholder satisfaction model. PhD thesis, Bond University, Australia.
Amer, F; Koh, H Y and Golparvar-Fard, M (2021) Automated methods and systems for construction planning and scheduling: Critical review of three decades of research. Journal of Construction Engineering and Management, 147(7): 0002093, ISSN 0733-9364
Amin, F; Poespito Hadi, W; Zauhar, S and Santoso Haryono, B (2022) Determinants of post COVID-19 food security policy success. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 440-450. ISSN 1759-5916
Amoo, O; Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in eastern cape South Africa: A case study. Journal of Construction Business and Management, 5(2), pp. 54-67. ISSN 2521-0165
Amponsah, Richard (2011) Improving project management practice in Ghana with focus on agriculture, banking and construction sectors of the Ghanaian economy. PhD thesis, RMIT University, Australia.
Amuda-Yusuf, G (2018) Critical success factors for building information modelling implementation. Construction Economics and Building, 18(3), pp. 55-73. ISSN 2204-9029
Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(2), pp. 163-175. ISSN 1466433X
Andrade, J B (2017) Early stage design methodology to ensure life cycle sustainability of residential buildings. PhD thesis, Universidade do Minho, Portugal.
Annamalaisami, C D and Kuppuswamy, A (2022) Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6), pp. 1079-1089. ISSN 1562-3599
Antwi-Afari, M F; Li, H; Edwards, D J; Pärn, E A; Owusu-Manu, D G; Seo, J and Wong, A Y L (2018) Identification of potential biomechanical risk factors for low back disorders during repetitive rebar lifting. Construction Innovation, 18(2), pp. 206-226. ISSN 1471-4175
Anumba, C J (1989) An integrated two and three dimensional data structure for a structural engineering CAD system. PhD thesis, University of Leeds, UK.
Appau, M. W.; Anugwo, I. and Attakora-Amaniampong, E. (2026) Rethinking office building rehabilitation: Perceptions of stakeholder influence and institutional norms in Ghana. Built Environment Project and Asset Management, 16(3), pp. 503-519. ISSN 2044-124X
Araujo, Adolpho Guido de (2021) Methodology for evaluation of environmental aspects in urban subdivision works in the pre-construction phase. PhD thesis, Universidade Federal de Pernambuco, Brazil.
Arayici, Y; Tokdemir, O B and Kassem, M (2023) A quantitative, evidence-based analysis of correlations between lean construction and building information modelling. Smart and Sustainable Built Environment, 12(5), pp. 975-1001. ISSN 2046-6099
Argyroudis, S A; Nasiopoulos, G; Mantadakis, N and Mitoulis, S A (2021) Cost-based resilience assessment of bridges subjected to earthquakes. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 209-222. ISSN 1759-5916
Arif, M; Bendi, D; Toma-Sabbagh, T and Sutrisna, M (2012) Construction waste management in India: An exploratory study. Construction Innovation, 12(2), pp. 133-155. ISSN 1471-4175
Arif, M; Syal, M and Hightower, R (2013) Investigating the green leadership in energy and environmental design (LEED) servicescape scale in Brazil. Construction Innovation, 13(3), pp. 242-265. ISSN 1471-4175
Arkani, S (1999) Contractual interfaces: the implications of building production process management and interorganisational relations for productivity in building project coalitions. PhD thesis, University of Greenwich, UK.
Arora, R (1997) Role and influence of emerging social dynamics in decisions on investment opportunities in construction industry. PhD thesis, Indian Institute of Technology Delhi, India.
Arshad, H; Qasim, M; Thaheem, M J and Gabriel, H F (2017) Quantification of material wastage in construction industry of Pakistan: An analytical relationship between building types and waste generation. Journal of Construction in Developing Countries, 22(2), pp. 19-34. ISSN 1823-6499
Artis, D A Z (2015) Women as leaders in construction in a Northwestern US city: A multiple-case study of the effectiveness of motivation practices and success strategies. PhD thesis, Capella University, USA.
Asadi, E (2020) Risk-informed multi-criteria decision framework for resilience and sustainability assessment of building structures. PhD thesis, Case Western Reserve University, USA.
Ashraf, Hassan (2018) Psychological conflict management climate in general contractor's project organization and its influence on project performance: exploring multiple psychosocial and behavioral pathways. PhD thesis, University of Hong Kong, Hong Kong.
Ashrafi, R M (1981) Risk analysis in management planning and project control: probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty. PhD thesis, University of Bradford, UK.
Asiedu, R. O.; Amoakwa, A. B.; Ameyaw, C.; Owusu-Manu, D. G.; Daniels, P. A. and Gyimah, S. (2026) Environmental, social, and governance considerations in sustainable construction project delivery. Construction Economics and Building, 26(2), ISSN 2204-9029
Aslam, M (2021) Optimizing selection and implementation protocols of lean construction tools and techniques for rapid initial successes. PhD thesis, North Dakota State University, USA.
Aslan, V Z (2012) Financial implications of engineering decisions. PhD thesis, Texas A&M University, USA.
Asmone, A S (2020) Development of a bayesian based design-for-maintinability decision support framework. PhD thesis, National University of Singapore, Singapore.
Asnaashari, E; Knight, A; Hurst, A and Farahani, S S (2009) Causes of construction delays in Iran: Project management, logistics, technology and environment. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) Quantification of the state of practice of offsite construction and related technologies: Current trends and future prospects. Journal of Construction Engineering and Management, 148(7): 04022055, ISSN 0733-9364
Athapaththu, K I and Karunasena, G (2018) Framework for sustainable construction practices in Sri Lanka. Built Environment Project and Asset Management, 8(1), pp. 51-63. ISSN 2044-124X
Atherinis, D; Bakowski, B; Velcek, M and Moon, S (2018) Developing and laboratory testing a smart system for automated falsework inspection in construction. Journal of Construction Engineering and Management, 144(3): 04017119, ISSN 0733-9364
Atkins, R and Emmanuel, R (2014) Could refurbishment of "traditional" buildings reducecarbon emissions? Built Environment Project and Asset Management, 4(3), pp. 221-237. ISSN 2044-124X
Atkinson, A R and Westall, R (2010) The relationship between integrated design and construction and safety on construction projects. Construction Management and Economics, 28(9), pp. 1007-1017. ISSN 1466433X
Attia, T M (2002) The impact of communication technologies on group problem-solving performance in construction. PhD thesis, North Carolina State University, USA.
Au-Yong, C P; Chua, S J L; Ali, A S and Tucker, M (2019) Optimising maintenance cost by prioritising maintenance of facilities services in residential buildings. Engineering, Construction and Architectural Management, 26(8), pp. 1593-1607. ISSN 0969-9988
Augenbroe, G and Park, C S (2005) Quantification methods of technical building performance. Building Research & Information, 33(2), pp. 159-172. ISSN 0961-3218
Awuzie, B O and McDermott, P (2016) The role of contracting strategies in social value implementation. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 106-114. ISSN 17514304
Ayodele, T O (2022) Factors influencing the adoption of real option analysis in RED appraisal: An emergent market perspective. International Journal of Construction Management, 22(6), pp. 1042-1052. ISSN 1562-3599
Ayodele, T O and Kajimo-Shakantu, K (2022) Challenges and drivers to data sharing among stakeholders in the South African construction industry. Journal of Engineering, Design and Technology, 20(6), pp. 1698-1715. ISSN 1726-0531
Ayodele, T O and Olaleye, A (2021) Flexibility decision pathways in the management of uncertainty in property development: Experience from an emerging market. Journal of Financial Management of Property and Construction, 26(3), pp. 408-432. ISSN 1366-4387
Ayodele, T O and Olaleye, A (2022) Fundamental sources of uncertainty in real estate development: Perspectives from an emerging market. International Journal of Construction Management, 22(14), pp. 2775-2787. ISSN 1562-3599
Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.
Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364
Azadeh, A; Kalantari, M; Ahmadi, G and Eslami, H (2019) A flexible genetic algorithm-fuzzy regression approach for forecasting: The case of bitumen consumption. Construction Innovation, 19(1), pp. 71-88. ISSN 1471-4175
Azharuddin, M (2019) Integrated carbon emission management for the United Arab Emirates construction industry. PhD thesis, Heriot-Watt University, UK.
Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects. PhD thesis, University of Alberta, Canada.
Azmi, N A; Sweis, G; Sweis, R and Sammour, F (2023) Exploring blockchain-enabled smart contracts technology implementation within ready-mixed concrete plants industry in Saudi Arabia. International Journal of Construction Management, 23(14), pp. 2400-2408. ISSN 1562-3599
Azmy, N (2012) The role of team effectiveness in construction project teams and project performance. PhD thesis, Iowa State University, USA.
Babakhani, J and Veysi, F (2024) Investigation and optimization of forced convective heat transfer around a tall building using experimental results. International Journal of Building Pathology and Adaptation, 42(5), pp. 893-913. ISSN 2398-4708
Babatunde, S O; Perera, S; Zhou, L and Udeaja, C (2016) Stakeholder perceptions on critical success factors for public-private partnership projects in Nigeria. Built Environment Project and Asset Management, 6(1), pp. 74-91. ISSN 2044-124X
Babon-Ayeng, P; Kissi, E; Tannor, R A; Aigbavboa, C and Badu, E (2024) Critical success factors (CSFs) for the adoption of green construction concepts in road construction in Ghana. International Journal of Construction Management, 24(13), pp. 1465-1474. ISSN 1562-3599
Baharudin, M R; Nasruddin, H N; Rahman, A A; Mahadi, M R and Noor, S B M (2018) Numerical model for individual time calculation for evacuation among secondary students. International Journal of Building Pathology and Adaptation, 36(5), pp. 450-470. ISSN 23984708
Bajere, P A (1996) Maintenance conditions and occupant behavior in government-provided housing in Lagos, Nigeria. DIT thesis, University of Northern Iowa, USA.
Bajjou, M S and Chafi, A (2022) Exploring the critical waste factors affecting construction projects. Engineering, Construction and Architectural Management, 29(6), pp. 2268-2299. ISSN 0969-9988
Ballard, H G (2000) The last planner system of production control. PhD thesis, University of Birmingham, UK.
Ballesteros-Pérez, P (2017) M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063, ISSN 0733-9364
Bangwal, D and Tiwari, P (2019) Environmental design and awareness impact on organization image. Engineering, Construction and Architectural Management, 26(1), pp. 29-45. ISSN 0969-9988
Baradan, S (2004) Comparative injury risk analysis of building trades. PhD thesis, Wayne State University, USA.
Barbarosoglu, B V (2018) Early detection of maintainability issues in MEP systems using BIM. PhD thesis, Illinois Institute of Technology, USA.
Barkokebas, B; Al-Hussein, M and Hamzeh, F (2023) Assessment of digital twins to reassign multiskilled workers in offsite construction based on lean thinking. Journal of Construction Engineering and Management, 149(1): 04022143, ISSN 0733-9364
Barraza, G A and Bueno, R A (2007) Probabilistic control of project performance using control limit curves. Journal of Construction Engineering and Management, 133(12), pp. 957-965. ISSN 0733-9364
Bartlett, A I (2018) Auto-extinction of engineered timber. PhD thesis, University of Edinburgh, UK.
Bashirzadeh Tabrizi, Toktam (2019) Towards a simplified LCA tool: Minimising the life cycle environmental impact at the early stages of building design. PhD thesis, University of Sydney, Australia.
Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.
Beaney, W D (2007) A principal components analysis of labour sectoral transfers. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Bello W A, O K T (2013) Weak management of the predictability of contingency allowance in construction projects in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ben-Alon, L (2020) Natural buildings: Integrating earthen building materials and methods into mainstream construction. PhD thesis, Carnegie Mellon University, USA.
Benmansour, C and Hogg, K (2002) An investigation into the barriers to innovation and their relevance within the construction sector. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Beran, V; Dlask, P; Eaton, D; Hromada, E and Zindulka, O (2011) Mapping of synchronous activities through virtual management momentum simulation. Construction Innovation, 11(2), pp. 190-211. ISSN 1471-4175
Bertolin, C and Sesana, E (2024) Natural hazards affecting cultural heritage: Assessment of flood and landslide risk for the 28 existing Norwegian stave churches. International Journal of Building Pathology and Adaptation, 42(1), pp. 48-91. ISSN 23984708
Bettemir, O H (2025) Analysis of existing resource distribution metrics and suggestion of new metrics. Journal of Construction Engineering and Management, 151(2): 04024195, ISSN 0733-9364
Bhangale, K; Joshi, K; Gupta, R and Gardas, B (2025) Assessing project complexity factors for railway megaprojects: A Delphi-BWM approach. Journal of Engineering, Design and Technology, 23(3), pp. 973-997. ISSN 1726-0531
Bigdellou, S and Chen, Q (2026) Quantification of economic influences on technology adoption and diffusion in the construction industry. International Journal of Construction Management, 26(4), pp. 621-638. ISSN 1562-3599
Bin Asad, S.; Purushothaman, M. B. and Poshdar, M. (2026) Interactions of factors affecting the implementation of integrated project delivery in the New Zealand construction industry: A system dynamics and network analysis approach. Construction Management and Economics, 44(6), pp. 453-479. ISSN 0144-6193
Bird, B (1987) Costs-in-use: Principles in the context of building procurement. Construction Management and Economics, 5(4), ISSN 01446193
Birgonul, M T; Dikmen, I and Demirel, T (2005) Decision support tool for the quantification of fault rates in construction fall accidents. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Bittner, Ksenia (2020) Building information extraction and refinement from vhr satellite imagery using deep learning techniques. PhD thesis, Osnabrück University, Germany.
Blanche, K G (1996) Personal and professional characteristics, perceptions of barriers, and strategies of women in different levels of the superintendency. EdD thesis, University of Maryland, College Park, USA.
Blomenkamp, M (2011) A program evaluation of the building construction of Bellevue Elementary School for the Bellevue Public Schools. EdD thesis, University of Nebraska at Omaha, USA.
Bo, X and Chan, A P C (2012) Investigation of barriers to entry into the design-build market in the people's republic of China. Journal of Construction Engineering and Management, 138(1), pp. 120-127. ISSN 0733-9364
Boadu, E. F.; Wang, C. C. and Sunindijo, R. Y. (2021) Challenges for occupational health and safety enforcement in the construction industry in Ghana. Construction Economics and Building, 21(1), pp. 1-21. ISSN 2204-9029
Boakye Danquah, C; Acheampong, A and Adjei-Kumi, T (2022) Level of awareness of formwork design in the Ghanaian construction industry; enabling future technology application. Journal of Engineering, Design and Technology, 20(4), pp. 1015-1039. ISSN 1726-0531
Boateng, A; Ameyaw, C and Mensah, S (2022) Assessment of systematic risk management practices on building construction projects in Ghana. International Journal of Construction Management, 22(16), pp. 3128-3136. ISSN 1562-3599
Boateng, E B (2021) The role of human safety interventions on co-workers’ safety outcomes in construction projects. PhD thesis, University of Newcastle, Australia.
Bordalo, R; De Brito, J; Gaspar, P L and Silva, A (2011) Service life prediction modelling of adhesive ceramic tiling systems. Building Research & Information, 39(1), pp. 66-78. ISSN 0961-3218
Borges, W F and Mário, P D C (2017) Five project-duration control methods in time units: Case study of a linearly distributed planned value. Journal of Construction Engineering and Management, 143(6): 05017002, ISSN 0733-9364
Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.
Bossink, B A G and Brouwers, H J H (1996) Construction waste: Quantification and source evaluation. Journal of Construction Engineering and Management, 122(1), pp. 55-60. ISSN 0733-9364
Bourdakis, V (1994) Performance appraisal of sportshall and swimming pool buildings in Greece. PhD thesis, University of Bath, UK.
Boutfskis, V and Fellows, R F (1997) Appraising the performance of long span sportshalls and swimming pools in Greece. Journal of Financial Management of Property and Construction, 2(2), pp. 39-58. ISSN 1366-4387
Bowen, P; Govender, R and Edwards, P (2018) Determinants of aids knowledge among construction workers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Bowen, P; Yakubu, K and Govender, R (2024) Sexual concurrency and male condom use: Empirical evidence from the South African construction industry. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Boyd, D and Fellowes, J (2018) The problem of evaluating 'value for money' of school building programmes. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Brattebø, H; Bergsdal, H; Sandberg, N H; Hammervold, J and Müller, D B (2009) Exploring built environment stock metabolism and sustainability by systems analysis approaches. Building Research & Information, 37(5-6), pp. 569-582. ISSN 0961-3218
Brennan M, C A (2013) Development of a measure to assess attitudes towards sustainable development in the built environment: A pilot. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Brewer, G (2008) Innovation and attitude: mapping the profile of ICT decision-makers in architectural, engineering and construction firms. PhD thesis, University of Newcastle, Australia.
Bridgeman, J; Maple, P; Murdock, A; Hardy, S and Townley, C (2016) Demonstrating the social value of a schools engagement programme: Introducing young people to the construction professions. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Brogan, Elizabeth A (2022) Drainage design engineering risk on design-build transportation projects. PhD thesis, University of Colorado at Denver, USA.
Brown, C J (1985) A critical analysis of the application of management information systems in the civil engineering construction industry in South Africa. DBA thesis, University of Pretoria, South Africa.
Bruce, R D (2008) A study of craft worker length of employment at select Missouri construction companies. PhD thesis, Indiana State University, USA.
Bruce, R D; Gebken, R J and Strong, S D (2009) The impact of the leadership in energy and environmental design accredited professional (LEED-ap) credential on prime/general contractor employees. International Journal of Construction Education and Research, 5(3), pp. 182-196. ISSN 1557-8771
Bruce, R D; Gebken, R J and Strong, S D (2010) Evaluating self-perceived benefits of credentials in the building design and construction community: Cpc, LEED-ap, and dbia. International Journal of Construction Education and Research, 6(3), pp. 165-178. ISSN 1557-8771
Bruce, R D; Woolsey, R C and McCandless, D W (2009) A study of craft worker length of employment at select missouri construction companies. International Journal of Construction Education and Research, 5(1), pp. 3-11. ISSN 1557-8771
Budawara, N (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University, Canada.
Burcar, I and Radujkovic, M (2005) Risk registers in construction in Croatia. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Cades, A-P (2018) Influence of psychological capital and thinking perspectives on construction safety climate and performance. PhD thesis, Walden University, USA.
Caldas, C H; Kim, J Y; Haas, C T; Goodrum, P M and Zhang, D (2015) Method to assess the level of implementation of productivity practices on industrial projects. Journal of Construction Engineering and Management, 141(1): 04014061, ISSN 0733-9364
Calor, I and Alterman, R (2017) When enforcement fails: Comparative analysis of the legal and planning responses to non-compliant development in two advanced-economy countries. International Journal of Law in the Built Environment, 9(3), pp. 207-239. ISSN 1756-1450
Cameron, I (1999) A goal setting approach to the practice of safety management in the construction industry: Three case studies. PhD thesis, University of Manchester, UK.
Cameron, I; Hare, B and Duff, R (2013) An analysis of safety advisor roles and site safety performance. Engineering, Construction and Architectural Management, 20(5), pp. 505-521. ISSN 0969-9988
Capitanio, M (2018) More green space in Japanese shopping streets: Assessing the manifold potential of green roofs in Shimokitazawa, Tokyo. Smart and Sustainable Built Environment, 7(2), pp. 212-222. ISSN 2046-6099
Carandang, A M S; Garciano, L E O; Maruyama, O and De Jesus, R (2020) Proposed resilience index of water lifeline systems. International Journal of Disaster Resilience in the Built Environment, 12(3), pp. 253-264. ISSN 1759-5916
Carr, P G (2005) Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders. Journal of Construction Engineering and Management, 131(11), pp. 1165-1172. ISSN 0733-9364
Carr, R I (1993) Cost, schedule, and time variances and integration. Journal of Construction Engineering and Management, 119(2), pp. 245-265. ISSN 0733-9364
Carvajal-Figueroa, A (2006) The identification and measurement of the benefits of visualization technologies during the briefing process. PhD thesis, University of Reading, UK.
Castell, L (2005) Empowering the client in the briefing process. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Caven, V and Astor, E N (2013) The potential for gender equality in architecture: An Anglo-Spanish comparison. Construction Management and Economics, 31(8), pp. 874-882. ISSN 1466433X
Caven, V and Diop, M (2011) Women and equality in architecture: An Anglo-French comparative study. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Celik, T (2014) Developing a building construction associated social cost estimation system for Turkish construction industry. PhD thesis, University of Salford, UK.
Cevikcan, E and Kose, Y (2021) Optimization of profitability and liquidity for residential projects under debt and equity financing. Built Environment Project and Asset Management, 11(2), pp. 369-391. ISSN 2044-124X
Cha, H S; Kim, J and Han, J Y (2009) Identifying and assessing influence factors on improving waste management performance for building construction projects. Journal of Construction Engineering and Management, 135(7), pp. 647-656. ISSN 0733-9364
Chai, Y T and Wang, T K (2023) Evaluation and decision-making framework for concrete surface quality based on computer vision and ontology. Engineering, Construction and Architectural Management, 30(10), pp. 4881-4913. ISSN 0969-9988
Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Challender, J; Farrell, P and Sherratt, F (2015) Exploration of factors which affect trust within the context of construction partnering. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Challender, J; Farrell, P and Sherratt, F (2016) Collaborative trust in UK further education (FE) procurement strategies. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Chan, S L (2002) Responses of selected economic indicators to construction output shocks: The case of Singapore. Construction Management and Economics, 20(6), pp. 523-533. ISSN 01446193
Chang, C J and Yu, S W (2018) Three-variance approach for updating earned value management. Journal of Construction Engineering and Management, 144(6): 04018045, ISSN 0733-9364
Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy. PhD thesis, Columbia University, USA.
Chapman, C (2023) Green and grey drainage infrastructure: costs and benefits of reducing surface water flood risk. PhD thesis, University of Oxford, UK.
Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction. PhD thesis, George Washington University, USA.
Chatterjee, S (2010) Development of an analytic basis for performing all-hazards risk management. PhD thesis, Vanderbilt University, USA.
Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988
Chen, J; Taylor, J E and Comu, S (2017) Assessing task mental workload in construction projects: A novel electroencephalography approach. Journal of Construction Engineering and Management, 143(8): 04017053, ISSN 0733-9364
Chen, L and Manley, K (2014) Validation of an instrument to measure governance and performance on collaborative infrastructure projects. Journal of Construction Engineering and Management, 140(5): 04014006, ISSN 0733-9364
Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains. PhD thesis, Stanford University, USA.
Chen, Y; Cai, X; Li, J; Lin, P; Song, H; Liu, G; Cao, D and Ma, X (2023) The values and barriers of BIM implementation combination evaluation based on stakeholder theory: A study in China. Engineering, Construction and Architectural Management, 30(7), pp. 2814-2836. ISSN 0969-9988
Chen, Y; Dib, H and Cox, R F (2014) A measurement model of building information modelling maturity. Construction Innovation, 14(2), pp. 186-209. ISSN 1471-4175
Cheng, L; Ren, H; Guo, H and Cao, D (2025) Research on the evaluation method for safety cognitive ability of workers in high-risk construction positions. Engineering, Construction and Architectural Management, 32(12), pp. 8196-8218. ISSN 0969-9988
Cheng, E W L; li, H; Fang, D P and Xie, F (2004) Construction safety management: An exploratory study from China. Construction Innovation, 4(4), pp. 229-241. ISSN 1471-4175
Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework. PhD thesis, University of Wolverhampton, UK.
Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364
Cheung, Yan Ki Fiona (2011) Relationship management as a strategy for supply chain engagement in the civil engineering construction industry. PhD thesis, Queensland University of Technology, Australia.
Chia, F C; Skitmore, M; Gray, J and Bridge, A (2018) International comparisons of nominal and real construction labour productivity. Engineering, Construction and Architectural Management, 25(7), pp. 896-915. ISSN 0969-9988
Chiang, Y H and Cheng, E W L (2009) Perception of financial institutions toward financing PFI projects in Hong Kong. Journal of Construction Engineering and Management, 135(9), pp. 833-840. ISSN 0733-9364
Chiang, Y H; Cheng, E W L and Lam, P T I (2010) Epistemology of capital structure decisions by building contractors in Hong Kong. Construction Innovation, 10(3), pp. 329-345. ISSN 1471-4175
Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X
Chidiobi, C (2022) Development of frameworks for the management of materials procurement and construction waste for Nigerian contractors. PhD thesis, University of the West of England, Bristol, UK.
Chileshe, N and Boadua Yirenkyi-Fianko, A (2012) An evaluation of risk factors impacting construction projects in Ghana. Journal of Engineering, Design and Technology, 10(3), pp. 306-329. ISSN 1726-0531
Chileshe, N and John Kikwasi, G (2014) Risk assessment and management practices (ramp) within the Tanzania construction industry: Implementation barriers and advocated solutions. International Journal of Construction Management, 14(4), pp. 239-254. ISSN 1562-3599
Chileshe, N and Kikwasi, G J (2014) Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry. Engineering, Construction and Architectural Management, 21(3), pp. 291-319. ISSN 0969-9988
Chileshe, N; Reza Hosseini, M and Jepson, J (2016) Critical barriers to implementing risk assessment and management practices in the Iranian construction sector. Journal of Construction in Developing Countries, 21(2), pp. 81-112. ISSN 1823-6499
Chileshe N, K G J (2013) Perception of barriers to implementing risk assessment and management practices by construction professionals in Tanzania. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.
Choe, S and Leite, F (2017) Assessing safety risk among different construction trades: Quantitative approach. Journal of Construction Engineering and Management, 143(5): 04016133, ISSN 0733-9364
Chong, D; Wang, Y; Zhao, K; Wang, D and Oeser, M (2018) Asphalt fume exposures by pavement construction workers: Current status and project cases. Journal of Construction Engineering and Management, 144(4): 05018002, ISSN 0733-9364
Choudhary, R and Tian, W (2014) Influence of district features on energy consumption in non-domestic buildings. Building Research & Information, 42(1), pp. 32-46. ISSN 0961-3218
Choudhry, R M; Fang, D and Lingard, H (2009) Measuring safety climate of a construction company. Journal of Construction Engineering and Management, 135(9), pp. 890-899. ISSN 0733-9364
Choy, C F (2011) Revisiting the 'Bon Curve'. Construction Management and Economics, 29(7), pp. 695-712. ISSN 1466433X
Chua, D K H; Yeoh, K W and Song, Y (2010) Quantification of spatial temporal congestion in four-dimensional computer-aided design. Journal of Construction Engineering and Management, 136(6), pp. 641-649. ISSN 0733-9364
Chua, S J L; Zubbir, N B; Ali, A S and Au-Yong, C P (2018) Maintenance of high-rise residential buildings. International Journal of Building Pathology and Adaptation, 36(2), pp. 137-151. ISSN 23984708
Chuang, J (2014) The changing foundations of Chinese development: From low-cost labor to land dispossession. PhD thesis, University of California, Berkeley, USA.
Clarke, L (2006) Valuing labour. Building Research & Information, 34(3), pp. 246-256. ISSN 0961-3218
Clarke, L and Wall, C (2000) Craft versus industry: The division of labour in European housing construction. Construction Management and Economics, 18(6), pp. 689-698. ISSN 01446193
Cleary, J (2024) Data driven insights into building project performance and outcomes through advanced data analytics. PhD thesis, Arizona State University, USA.
Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.
Consoli, G G S (2004) Conducting an ethno-methodological study for the comparison of private and public prison delivery processes in Australia. Journal of Construction Procurement, 10(1),
Cooper, L P (2008) How project teams conceive of and manage pre-quantitative risk. PhD thesis, University of Southern California, USA.
Corbett, D I (1997) Quantifying quality in industrial construction. PhD thesis, Pennsylvania State University, USA.
Cosma, C (2003) Development of a systematic approach for uncertainty assessment in scheduling multiple repetitive construction processes by using fuzzy set theory. PhD thesis, University of Florida, USA.
Cottrell, W D (1999) Simplified program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 125(1), pp. 16-22. ISSN 0733-9364
Cox, R F (1994) Case studies of employee participation programs in construction and their effects on absenteeism. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Coşkunoḡlu, O (1984) Optimal probabilistic compression of PERT networks. Journal of Construction Engineering and Management, 110(4), pp. 437-446. ISSN 0733-9364
Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.
Cuciniello, G; Inzerillo, G; Corazziari, L; Ciampini, A; Degni, R; Torresi, M and Leandri, P (2023) Modeling the tire-pavement noise as a regression function of speed, mixture properties, and age of the layer. Journal of Construction Engineering and Management, 149(9): 04023080, ISSN 0733-9364
Dada, J O and Jagboro, G O (2012) Core skills requirement and competencies expected of quantity surveyors: Perspectives from quantity surveyors, allied professionals and clients in Nigeria. Construction Economics and Building, 12(4), pp. 78-90. ISSN 2204-9029
Dadi, G B; Goodrum, P M; Taylor, T R B and Carswell, C M (2014) Cognitive workload demands using 2D and 3D spatial engineering information formats. Journal of Construction Engineering and Management, 140(5): 04014001, ISSN 0733-9364
Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.
Damnjanovic, I; Duthie, J and Waller, S T (2008) Valuation of strategic network flexibility in development of toll road projects. Construction Management and Economics, 26(9), pp. 979-990. ISSN 1466433X
Davis, B L (2024) State-legalized marijuana: The effects on construction safety. PhD thesis, Capitol Technology University, USA.
Davis, C (2020) The influence of national culture on conflict in project management: How organizations manage conflict. PhD thesis, Northcentral University, USA.
Davis, L; Miles, M; Riley, M and Pan, W (2010) Developing lean supply in construction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Davis, M M; Vallejo Espinosa, A L and Ramirez, F R (2019) Beyond green façades: Active air-cooling vertical gardens. Smart and Sustainable Built Environment, 8(3), pp. 243-252. ISSN 2046-6099
Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(2), pp. 210-230. ISSN 0969-9988
De Jarnette, V; McCarthy, L M; Bennert, T and Guercio, M C (2013) Use of mechanistic-empirical pavement design principles to assign asphalt pavement pay factor adjustments. Journal of Construction Engineering and Management, 139(11): 4013024, ISSN 0733-9364
De Ridder, H A J (1994) Design and construct of complex civil engineering systems: A new approach to organization and contracts. PhD thesis, Delft University of Technology, Netherlands.
De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Deep, S; Gajendran, T; Jefferies, M and Jha, K N (2023) Developing subcontractor-general contractor relationships in the construction industry: Constructs and scales for analytical decision making. Journal of Construction Engineering and Management, 149(12): 04023136, ISSN 0733-9364
Dejahang, F (2004) Determinants of productivity on construction sites. PhD thesis, London South Bank University, UK.
Delatte, G (2014) The effects of three dimensional modeling on labor productivity through enhancing visualization of craft workers in the industrial construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Delghust, M; Roelens, W; Tanghe, T; De Weerdt, Y and Janssens, A (2015) Regulatory energy calculations versus real energy use in high-performance houses. Building Research & Information, 43(6), pp. 675-690. ISSN 0961-3218
Dewlaney, K S; Hallowell, M R and Fortunato Iii, B R (2012) Safety risk quantification for high performance sustainable building construction. Journal of Construction Engineering and Management, 138(8), pp. 964-971. ISSN 0733-9364
Dharmapalan, V; Gambatese, J A; Fradella, J and Moghaddam Vahed, A (2015) Quantification and assessment of safety risk in the design of multistory buildings. Journal of Construction Engineering and Management, 141(4): 04014090, ISSN 0733-9364
Dhawan, K (2023) Supply chain management driven logistics efficiency in the New Zealand construction sector. PhD thesis, Auckland University of Technology, New Zealand.
Didla, N R (2018) Evaluation of the impact of quality risk management on quality performance in the UAE construction projects. PhD thesis, Heriot-Watt University, UK.
Diekmann, J E and Peppier, S E (1984) Union and open shop labor cost differences. Journal of Construction Engineering and Management, 110(1), pp. 87-99. ISSN 0733-9364
Din, A (2020) Accounting for carbon impacts in buildings: a rating procedure. PhD thesis, London Metropolitan University, UK.
Dinca, M S; Barbuta-Misu, N; Madaleno, M; Dinca, G and Deari, F (2017) Integrated analysis of EU construction companies' financial performances. Journal of Construction Engineering and Management, 143(6): 04017002, ISSN 0733-9364
Ding, Z and Ng, F (2008) A new way of developing semantic differential scales with personal construct theory. Construction Management and Economics, 26(11), pp. 1213-1226. ISSN 1466433X
Ding, Z; Ng, F and Wang, J (2014) Testing trust scale measurement invariance in project teams. Journal of Engineering, Design and Technology, 12(2), pp. 209-222. ISSN 1726-0531
Dithebe, K; Aigbavboa, C O; Thwala, W D and Oke, A E (2019) Factor analysis of critical success factors for water infrastructure projects delivered under public-private partnerships. Journal of Financial Management of Property and Construction, 24(3), pp. 338-357. ISSN 1366-4387
Doan, D T (2019) Enhancing green star certification by improving bim uptake through system dynamics modelling. PhD thesis, Auckland University of Technology, New Zealand.
Dong, F (2010) Essays in advanced risk management and quantitative strategies in infrastructure finance. PhD thesis, Columbia University, USA.
Donohoe, S and Brooks, L (2007) Reflections on construction management procurement following Great Eastern Hotel company v. John laing. Construction Management and Economics, 25(7), pp. 701-708. ISSN 1466433X
Dosumu, O and Aigbavboa, C O (2018) Adoption of light steel (LS) for building projects in South Africa. Journal of Engineering, Design and Technology, 16(5), pp. 711-733. ISSN 1726-0531
Dozzi, S P; Abourizk, S M and Schroeder, S L (1996) Utility-theory model for bid markup decisions. Journal of Construction Engineering and Management, 122(2), pp. 119-124. ISSN 0733-9364
Drejer, I and Vinding, A L (2006) Organisation, 'anchoring' of knowledge, and innovative activity in construction. Construction Management and Economics, 24(9), pp. 921-931. ISSN 1466433X
Du, Q; Qi, X; Zou, P X W and Zhang, Y (2024) Bi-objective optimization framework for prefabricated construction service combination selection using genetic simulated annealing algorithm. Engineering, Construction and Architectural Management, 31(10), pp. 3921-3945. ISSN 0969-9988
Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.
Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364
Dulaimi, M F; Nepal, M P and Park, M (2005) A hierarchical structural model of assessing innovation and project performance. Construction Management and Economics, 23(6), pp. 565-577. ISSN 01446193
Dunston, P S; Gambatese, J A and McManus, J F (2005) Assessing state transportation agency constructability implementation. Journal of Construction Engineering and Management, 131(5), pp. 569-578. ISSN 0733-9364
Duong, A. T. B.; Ta, T. D.; Truong, D. Q.; Hoang, T. G.; Pham, H.; Hoang, T. H. and Truong Quang, H. (2026) Direct and indirect effect of risk on construction supply chain in disruption era: A service-oriented view. Engineering, Construction and Architectural Management, 33(4), pp. 2995-3024. ISSN 0969-9988
Duong, A T B; Pham, T; Truong Quang, H; Hoang, T G; McDonald, S; Hoang, T H and Pham, H T (2023) Ripple effect of disruptions on performance in supply chains: An empirical study. Engineering, Construction and Architectural Management, 31(13), pp. 1-22. ISSN 0969-9988
Duong, T B A; Pham, T; Truong, Q H; Nguyen, K; Pham, C H; Hoang, T H and Pham, T H (2023) Risk in sustainable construction supply chains: Construct development and measurement validation. Construction Management and Economics, 41(8), pp. 634-650. ISSN 01446193
Durdyev, S; Koc, K; Karaca, F and Gurgun, A P (2023) Strategies for implementation of green roofs in developing countries. Engineering, Construction and Architectural Management, 30(6), pp. 2481-2502. ISSN 0969-9988
Durdyev, S and Mbachu, J (2018) Key constraints to labour productivity in residential building projects: Evidence from Cambodia. International Journal of Construction Management, 18(5), pp. 385-393. ISSN 1562-3599
Durnall, T J and Proverbs, D (2009) An alternative model of motivation for steeplejacks within the petrochemical and power generation industries. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2023) Mitigating high development cost of low-cost housing: Findings from an empirical investigation. International Journal of Construction Management, 23(3), pp. 472-483. ISSN 1562-3599
Edison, J C and Singla, H K (2020) Development of a scale for factors causing delays in infrastructure projects in India. Construction Economics and Building, 20(1), pp. 36-55. ISSN 2204-9029
Edwards, D J and Holt, G D (2006) Hand-arm vibration exposure from construction tools: Results of a field study. Construction Management and Economics, 24(2), pp. 209-217. ISSN 01446193
Edwards, D J and Holt, G D (2007) Construction hand tools: Vibration emissions from alternative inserts. Building Research & Information, 35(3), pp. 329-342. ISSN 0961-3218
Edwards, D J; Thorpe, T and Love, P (2004) Financial implications of poorly utilised construction plant and equipment. Journal of Financial Management of Property and Construction, 9(1), pp. 3-12. ISSN 1366-4387
Eftekhari, M M (1996) Ventilator air flow measurement in new houses. Building Research & Information, 24(3), pp. 176-182. ISSN 0961-3218
Egbu, C O; Young, B A and Torrance, V B (1996) Refurbishment management practices in the shipping and construction industries: lessons to be learned. Building Research & Information, 24(6), pp. 329-338. ISSN 0961-3218
Egbu, C O; Young, B A and Torrance, V B (1998) Planning and control processes and techniques for refurbishment management. Construction Management and Economics, 16(3), pp. 315-325. ISSN 01446193
Eissa, R; Nabi, M A and El-Adaway, I H (2024) Risk–reward share allocation under different integrated project delivery relational structures: A monte-carlo simulation and cooperative game theoretic solutions approach. Journal of Construction Engineering and Management, 150(4): 04024013, ISSN 0733-9364
Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2005) A conceptual demand led model founded on theories of labour market mismatch for the construction and building services industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ekemode, B G (2020) Impact of urban regeneration on commercial property values in Osogbo, Osun State, Nigeria. Smart and Sustainable Built Environment, 9(4), pp. 557-571. ISSN 2046-6099
Ekemode, B G (2024) Factors influencing building information modelling adoption for residential property development. International Journal of Construction Management, 24(9), pp. 986-996. ISSN 1562-3599
El-Hamrawy, S A K; El-Maaty, A E A and Akal, A Y (2017) Proposed models to measure the quality of highway projects regression analysis vs statistical: fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988
El-Hamrawy, S A-K; Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988
El-Kholy, A M (2021) Exploring the best ANN model based on four paradigms to predict delay and cost overrun percentages of highway projects. International Journal of Construction Management, 21(7), pp. 694-712. ISSN 1562-3599
El-Mashaleh, M S (2003) Firm performance and information technology utilization in the construction industry: An empirical study. PhD thesis, University of Florida, USA.
El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction, 25(2), pp. 225-246. ISSN 1366-4387
El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364
Elgrari, O (2011) The role of technology transfer in improving manpower capability in private house building companies in Libya. PhD thesis, University of Salford, UK.
Ellabbar, K and Havard, T (2005) The accounting disclosure in developing countries: A comparative study of Libyan & Egyptian construction companies. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.
Elsayah, O S (2016) A framework for improvement of contractor selection procedures on major construction project in Libya. PhD thesis, Edinburgh Napier University, UK.
Enshassi, A; Ayash, A and Mohamed, S (2018) Key barriers to the implementation of energy-management strategies in building construction projects. International Journal of Building Pathology and Adaptation, 36(1), pp. 15-40. ISSN 23984708
Erdis, E; Genç, O and Aydınlı, S (2021) Mobbing on construction professionals: Causes, consequences, and precautions. International Journal of Construction Management, 21(10), pp. 987-996. ISSN 1562-3599
Erol, H H (2020) Incorporating complexity into risk management:An integrated risk assessment process for mega construction projects. PhD thesis, Middle East Technical University, Turkey.
Escamilla, E (2011) Investigation of project management planning practices for renovation of historical buildings in urban contexts located in Texas. PhD thesis, Texas A&M University, USA.
Esmaeili, B and Hallowell, M (2013) Integration of safety risk data with highway construction schedules. Construction Management and Economics, 31(6), pp. 528-541. ISSN 1466433X
Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. II: Predicting safety outcomes using generalized linear models. Journal of Construction Engineering and Management, 141(8): 04015022, ISSN 0733-9364
Espinoza, D; Rojo, J; Cifuentes, A and Morris, J (2020) DNPV: A valuation methodology for infrastructure and capital investments consistent with prospect theory. Construction Management and Economics, 38(3), pp. 259-274. ISSN 01446193
Eufrasio Espinosa, R M (2015) A visio-spatial life cycle energy model of building materials within a bioregional context: Mapping the embodied energy of fired clay bricks in Cuitzeo, Mexico. PhD thesis, University of Sheffield, UK.
Evans, M (2013) An investigation into occupants' satisfaction in UK sustainable social housing. PhD thesis, University of the West of England, Bristol, UK.
Evans, M; Farrell, P; Zewein, W and Mashali, A (2021) Analysis framework for the interactions between building information modelling (BIM) and lean construction on construction mega-projects. Journal of Engineering, Design and Technology, 19(6), pp. 1451-1471. ISSN 1726-0531
Ewuga, D and Adesi, M (2023) Integrating sustainability practices into the Irish construction supply chain: Main contractors' perspective. Built Environment Project and Asset Management, 13(1), pp. 105-122. ISSN 2044-124X
Eze, E C; Sofolahan, O; Ugulu, R A and Ameyaw Effah, E E (2025) Bolstering circular economy in construction through digitalisation. Construction Innovation, 25(6), pp. 1774-1796. ISSN 1471-4175
Eze, E C; Sofolahan, O; Uzoma, C N; Ameyaw, E E and Omoboye, O (2025) Impediments to building information modelling-enabled construction waste management in Nigeria. Built Environment Project and Asset Management, 15(3), pp. 500-517. ISSN 2044-124X
Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2010) Development of an ICT-based logistics framework for the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2015) Decision-making framework for selecting ICT-based construction logistics systems. Journal of Engineering, Design and Technology, 13(2), pp. 260-281.
Fadiya, O O (2012) Development of an integrated decision analysis framework for selecting ICT-based logistics systems in the construction industry. PhD thesis, University of Wolverhampton, UK.
Fahmy, Sami W (2005) Comparative analysis of expected and actual performance of public design-build projects. PhD thesis, University of Calgary, Canada.
Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364
Fan, L; Ho, C and Ng, V (2001) A study of quantity surveyors' ethical behaviour. Construction Management and Economics, 19(1), pp. 19-36. ISSN 01446193
Fang, D; Li, M; Fong, P S W and Shen, L (2004) Risks in Chinese construction market: contractors' perspective. Journal of Construction Engineering and Management, 130(6), pp. 853-861. ISSN 0733-9364
Fang, D; Wang, Y; Lim, H W; Ma, L; Gu, B and Huang, Y (2023) Construction of a Bayesian network based on leadership-culture-behavior model to improve owner safety management behavior. Journal of Construction Engineering and Management, 149(3): 04022177, ISSN 0733-9364
Farooghi, F (2020) The effect of natural disasters on construction labor wage fluctuations: A spatial difference-in-difference analysis. PhD thesis, University of Texas at Arlington, USA.
Farrow, C B (2016) Problem-solving styles in the Southeast construction industry. EdD thesis, Auburn University, USA.
Fay, R; Treloar, G and Iyer-Raniga, U (2000) Life-cycle energy analysis of buildings: A case study. Building Research & Information, 28(1), pp. 31-41. ISSN 0961-3218
Federle, M O (1990) Substitutes for leadership in the environment of unionized construction carpenters. PhD thesis, University of Michigan, USA.
Feng, K (2020) Environmentally friendly construction processes under uncertainty assessment, optimisation and robust decision-making. PhD thesis, Luleå University of Technology, Sweden.
Fergusson, K J (1993) Impact of integration on industrial facility quality. PhD thesis, Stanford University, USA.
Finnie, D (2013) Comparison of time adjustment clauses between DZ3910, AS4000 and STCC. Construction Economics and Building, 13(1), pp. 66-84. ISSN 2204-9029
Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Flanagan, R and Marsh, L (2000) Measuring the costs and benefits of information technology in construction. Engineering, Construction and Architectural Management, 7(4), pp. 423-435. ISSN 0969-9988
Foliente, G and Seo, S (2012) Modelling building stock energy use and carbon emission scenarios. Smart and Sustainable Built Environment, 1(2), pp. 118-138. ISSN 2046-6099
Forbes, Lincoln Harding (1999) An engineering management-based investigation of owner satisfaction, quality and performance variables in health care facilities construction. PhD thesis, University of Miami, USA.
Fortune, C and Cox, O (2005) Current practices in building project contract price forecasting in the UK. Engineering, Construction and Architectural Management, 12(5), pp. 446-457. ISSN 0969-9988
Fortune, C and Skitmore, M (1994) Quantification skills in the construction industry. Construction Management and Economics, 12(1), pp. 79-88. ISSN 01446193
Fouchal, F; Ellis, K; Hassan, T and Firth, S (2013) ICT-enabled energy efficiency: a lens onto practices of other sectors. Smart and Sustainable Built Environment, 2(2), pp. 158-178. ISSN 2046-6099
Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364
Freitas, J A; Sanquetta, C R; Iwakiri, S and de Mello Maron da Costa, M D R (2021) The use of wood construction materials as a way of carbon storage in residential buildings in Brazil. International Journal of Construction Management, 21(3), pp. 292-298. ISSN 1562-3599
Frempong-Jnr, E Y; Ametepey, S O and Cobbina, J E (2023) Impact of stakeholder management on efficient construction waste management. Smart and Sustainable Built Environment, 12(3), pp. 607-634. ISSN 2046-6099
Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.
Furci, J and Sunindijo, R Y (2020) Impacts of the whs act 2011 on safety management in small and medium construction companies. International Journal of Construction Management, 20(3), pp. 196-206. ISSN 1562-3599
Futcher, K and Thorpe, A (2001) Monte Carlo simulation and Pareto techniques for calculation of multi-project outturn-variance. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Galadari, A I (2008) Evaluation of road construction alternatives: A regretful approach. PhD thesis, University of Colorado at Denver, USA.
Ganapathy, G P and Haupt, T C (2024) Engineering properties of SBS and crumb-rubber modified bitumen: a design of experiment approach. Journal of Engineering, Design and Technology, 22(6), pp. 1742-1754. ISSN 1726-0531
Ganguly, I (2008) Modeling alternatives and visualization of product adoption and usage in the residential construction industry. PhD thesis, University of Washington, USA.
Ganguly, K K; Padhy, R K and Rai, S S (2017) Managing the humanitarian supply chain: A fuzzy logic approach. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 521-536. ISSN 1759-5916
Garg, Arun (2022) Quantifying resilient safety culture using complex network theory. PhD thesis, Griffith University, Australia.
Gaspar, P L and De Brito, J (2008) Service life estimation of cement-rendered facades. Building Research & Information, 36(1), pp. 44-55. ISSN 0961-3218
Gasu, M B (2020) Residents' satisfaction with the use of green infrastructure in Osogbo, Osun State, Nigeria. African Journal of Built Environment Research, 4(1), pp. 1-19. ISSN 2414-0236
Gasue, R; Aklashie, S; Dompey, A M A; Agyekum, K and Opoku, D (2026) Implementing materials passports in the construction industry: Empirical evidence from Ghana. International Journal of Building Pathology and Adaptation, 44(1), pp. 15-35. ISSN 2398-4708
Gavilan, R M and Bernold, L E (1994) Source evaluation of solid waste in building construction. Journal of Construction Engineering and Management, 120(3), pp. 536-552. ISSN 0733-9364
Gbadebo, A (2020) Understanding continuous professional development: An holistic examination of engineering students engagement with, and motivation towards, continuous professional development. PhD thesis, University of York, UK.
Gebken, Richard John (2006) Quantification of transactional dispute resolution costs for the U.S. Construction industry. PhD thesis, University of Texas at Austin, USA.
Gebken II, R J (2006) Quantification of transactional dispute resolution costs for the United States construction industry. PhD thesis, University of Texas at Austin, USA.
Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X
Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.
Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364
George, T H (1994) A model of vocational, technical and apprenticeship craft training required to meet the needs of the construction industry in Florida. PhD thesis, University of Florida, USA.
Gething, B and Bordass, B (2006) Rapid assessment checklist for sustainable buildings. Building Research & Information, 34(4), pp. 416-426. ISSN 0961-3218
Ghaffour, W; Ouissi, M N and Velay Dabat, M A (2021) Analysis of urban thermal environments based on the perception and simulation of the microclimate in the historic city of Tlemcen. Smart and Sustainable Built Environment, 10(2), pp. 141-168. ISSN 2046-6099
Ghalenoei, N; Babaeian Jelodar, M; Paes, D; Sutrisna, M and Rahmani, D (2025) Offsite construction and BIM integration framework across project life cycle. Journal of Construction Engineering and Management, 151(7): 05025002, ISSN 0733-9364
Ghansah, F A; Owusu-Manu, D G; Ayarkwa, J; Edwards, D J and Hosseini, M R (2022) Assessing the level of awareness of smart building technologies (sbts) in the developing countries. Journal of Engineering, Design and Technology, 20(3), pp. 696-711. ISSN 1726-0531
Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.
Gholizadeh, P and Esmaeili, B (2020) Cost of occupational incidents for electrical contractors: Comparison using robust-factorial analysis of variance. Journal of Construction Engineering and Management, 146(7): 0001861, ISSN 0733-9364
Gill, Z M; Tierney, M J; Pegg, I M and Allan, N (2010) Low-energy dwellings: The contribution of behaviours to actual performance. Building Research & Information, 38(5), pp. 491-508. ISSN 0961-3218
Gillen, M E (1996) Nonfatal falls in construction workers: Predictors of injury severity. PhD thesis, University of California, San Francisco, USA.
Goel, A (2025) Construction management students' perception of BIM adoption and its implications in a non-mandated country. International Journal of Construction Management, 25(3), pp. 278-288. ISSN 1562-3599
Goodrum, P M and Haas, C T (2004) Long-term impact of equipment technology on labor productivity in the U.S. Construction industry at the activity level. Journal of Construction Engineering and Management, 130(1), pp. 124-133. ISSN 0733-9364
Goodrum, P M; Zhai, D and Yasin, M F (2009) Relationship between changes in material technology and construction productivity. Journal of Construction Engineering and Management, 135(4), pp. 278-287. ISSN 0733-9364
Gorse, C; Glew, D; Miles-Shenton, D and Farmer, D (2015) Addressing the thermal performance gap: Possible performance control tools for the construction manager. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Gorse, C A and Emmitt, S (2007) Communication behaviour during management and design team meetings: A comparison of group interaction. Construction Management and Economics, 25(11), pp. 1197-1213. ISSN 01446193
Goswami, M; Singh, J and Kumar, V (2016) An enterprise based decision support system for engineering aggregate selection: A case study. Journal of Engineering, Design and Technology, 14(4), pp. 851-873.
Goulias, D (1992) Quality assurance and specifications. PhD thesis, University of Texas at Austin, USA.
Goyal, S and Routroy, S (2023) Analyzing environmental sustainability enablers for an Indian steel manufacturing supply chain. Journal of Engineering, Design and Technology, 21(1), pp. 1-22. ISSN 1726-0531
Griffis, F H and Christodoulou, S (2000) Construction risk analysis tool for determining liquidated damages insurance premiums: Case study. Journal of Construction Engineering and Management, 126(6), pp. 407-413. ISSN 0733-9364
Gruneberg, S (2010) Does the Bon curve apply to infrastructure markets? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Gruneberg, S and Ive, G (2002) The relationship between the aggregate annual wage bills of heating and ventilation contractors, heating and ventilation industry output and construction industry output. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193
Gudem, M; Steinert, M; Welo, T and Leifer, L (2013) Redefining customer value in lean product development design projects. Journal of Engineering, Design and Technology, 11(1), pp. 71-89. ISSN 1726-0531
Guevara, J; Herrera, L and Salazar, J (2022) Interorganizational sponsor networks in road and social infrastructure PPP equity markets. Journal of Construction Engineering and Management, 148(4): 04022009, ISSN 0733-9364
Gundes, S (2011) Input structure of the construction industry: A cross-country analysis, 1968-90. Construction Management and Economics, 29(6), pp. 613-621. ISSN 1466433X
Gunduz, M (2002) Change orders impact assessment for labor intensive construction. PhD thesis, University of Wisconsin - Madison, USA.
Gunduz, M and Al-Ajji, I (2022) Employment of CHAID and crt decision tree algorithms to develop bid/no-bid decision-making models for contractors. Engineering, Construction and Architectural Management, 29(9), pp. 3712-3736. ISSN 0969-9988
Gunduz, M and Elsherbeny, H A (2021) Critical assessment of contract administration using multidimensional fuzzy logic approach. Journal of Construction Engineering and Management, 147(2): 04020162, ISSN 0733-9364
Gunner, J C (1997) A model of building price forecasting accuracy. PhD thesis, University of Salford, UK.
Gupta, T; Kothari, C and Misra, S (2025) Integrating 'difficulty in management' as a decision-making criterion in the risk assessment of PPP infrastructure projects. Construction Management and Economics, 43(7), pp. 502-517. ISSN 0144-6193
Guribie, F L; Owusu-Manu, D G; Badu, E and Edwards, D J (2023) Fuzzy synthetic evaluation of the systemic obstacles to personalizing knowledge flows within and across projects. Construction Innovation, 23(3), pp. 546-566. ISSN 1471-4175
Gurmu, A T (2026) Econometric analysis of macroeconomic factors influencing construction labour productivity at industry level: Evidence from Australia. Construction Management and Economics, 44(1), pp. 23-40. ISSN 0144-6193
Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029
Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.
Gyi, D E; Gibb, A G F and Haslam, R A (1999) The quality of accident and health data in the construction industry: Interviews with senior managers. Construction Management and Economics, 17(2), pp. 197-204. ISSN 01446193
Ha, D. K. (2026) An evaluation and comparison of critical factors contributing to falls-from-height hazards in Vietnamese building projects. Journal of Engineering, Design and Technology, 24(3), pp. 831-858. ISSN 1726-0531
Hailemariam, E K; Hailemariam, L M; Amede, E A and Nuramo, D A (2023) Identification of barriers, benefits and opportunities of using bamboo materials for structural purposes. Engineering, Construction and Architectural Management, 30(7), pp. 2716-2738. ISSN 0969-9988
Hajarolasvadi, H and Shahhosseini, V (2022) A system-dynamic model for evaluating the effect of person-team fit on project performance. Journal of Construction Engineering and Management, 148(11): 04022126, ISSN 0733-9364
Hajifathalian, K; Wambeke, B W; Liu, M and Hsiang, S M (2012) Effects of production control strategy and duration variance on productivity and work in process: Simulation-based investigation. Journal of Construction Engineering and Management, 138(9), pp. 1035-1043. ISSN 0733-9364
Haksever, A M (1998) Information overload in construction project management. PhD thesis, University of Reading, UK.
Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.
Hallowell, M R (2011) Risk-based framework for safety investment in construction organizations. Journal of Construction Engineering and Management, 137(8), pp. 592-599. ISSN 0733-9364
Hallowell, M R; Alexander, D and Gambatese, J A (2017) Energy-based safety risk assessment: Does magnitude and intensity of energy predict injury severity? Construction Management and Economics, 35(1-2), pp. 64-77. ISSN 01446193
Hallowell, M R and Gambatese, J A (2009) Activity-based safety risk quantification for concrete formwork construction. Journal of Construction Engineering and Management, 135(10), pp. 990-998. ISSN 0733-9364
Hamani, K (2019) Developing a corporate sustainability performance evaluation model of the UAE construction contractors. PhD thesis, Heriot-Watt University, UK.
Hamilton-MacLaren, F; Loveday, D and Mourshed, M (2009) The calculation of embodied energy in new build UK housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Hammad, M W; Abbasi, A and Ryan, M J (2018) Developing a novel framework to manage schedule contingency using theory of constraints and earned schedule method. Journal of Construction Engineering and Management, 144(4): 04018011, ISSN 0733-9364
Hammad, Mohammed (2018) Estimating, allocating and managing schedule and cost contingency in construction projects. PhD thesis, University of New South Wales, Australia.
Hammond, S F; Gajendran, T; Savage, D A and Maund, K (2021) Unpacking the problems behind the limited green construction adoption: Towards a theoretical model. Engineering, Construction and Architectural Management, 28(4), pp. 833-844. ISSN 0969-9988
Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364
Han, Y; Yin, Z; Zhang, J; Jin, R and Yang, T (2020) Eye-tracking experimental study investigating the influence factors of construction safety hazard recognition. Journal of Construction Engineering and Management, 146(8): 04020091, ISSN 0733-9364
Handojo, T (2001) The framework of a statistical acceptance plan based on the permanent deformation potential of asphalt concrete. PhD thesis, Pennsylvania State University, USA.
Hanna, A S; Chang, C K; Lackney, J A and Sullivan, K T (2007) Impact of overmanning on mechanical and sheet metal labor productivity. Journal of Construction Engineering and Management, 133(1), pp. 22-28. ISSN 0733-9364
Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364
Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364
Hanna, B A (1988) Role expectations of superintendents and architects in the state of Kansas relative to experience in school construction. EdD thesis, University of Kansas, USA.
Hardie, M; Allen, J and Newell, G (2013) Environmentally driven technical innovation by Australian construction SMEs. Smart and Sustainable Built Environment, 2(2), pp. 179-191. ISSN 2046-6099
Harris, Michael Samuel (2019) Competitive precinct projects: An evaluation of competitively positioned mixed-use megaprojects. PhD thesis, University of Sydney, Australia.
Hasan, M and Lu, M (2024) Mitigating project schedule risks by identifying subcritical paths and variance-critical activities. Journal of Construction Engineering and Management, 150(8): 04024096, ISSN 0733-9364
Hashim, H M; Ng, Y G; Talib, O and Md Tamrin, S B (2019) Content validation of flood disaster preparedness action (FDPA) items among small and medium enterprises (SME) business. International Journal of Disaster Resilience in the Built Environment, 10(1), pp. 2-13. ISSN 1759-5916
Hashim, R (2018) Green innovation adoption in the construction sector: the role of absorptive capacity and the effect of environmental requirements. PhD thesis, University of Edinburgh, UK.
Hassanain, M A; Alamoudi, A; Al-Hammad, A M and Abdallah, A (2020) Barriers to the implementation of poe practices in the Saudi Arabian building industry. Architectural Engineering and Design Management, 16(2), pp. 150-165. ISSN 1745-2007
Hassanein, A A G and El Nemr, W (2008) Claims management in the Egyptian industrial construction sector: A contractor's perspective. Engineering, Construction and Architectural Management, 15(3), pp. 246-259. ISSN 0969-9988
Haupt, T C (2001) The performance approach to construction worker safety and health. PhD thesis, University of Florida, USA.
He, R (2023) Modeling of sustainable materials management systems: Hybrid science-based, data-driven approaches. PhD thesis, Carnegie Mellon University, USA.
Hedborg, S (2022) ”It’s in the between”: Inter-project organising in project ecologies. PhD thesis, KTH Royal Institute of Technology, Sweden.
Heravi, G and Ilbeigi, M (2012) Development of a comprehensive model for construction project success evaluation by contractors. Engineering, Construction and Architectural Management, 19(5), pp. 526-542. ISSN 0969-9988
Herbsman, Z and Ellis, R (1992) Multiparameter bidding system: innovation in contract administration. Journal of Construction Engineering and Management, 118(1), pp. 142-150. ISSN 0733-9364
Herzog, Florian (2005) Strategic portfolio management for long-term investments: An optimal control approach. PhD thesis, ETH Zürich, Switzerland.
Hinze, J and Appelgate, L L (1991) Costs of construction injuries. Journal of Construction Engineering and Management, 117(3), pp. 537-550. ISSN 0733-9364
Ho, M F C and Ng, C W V (2003) Quantity surveyors' background and training, and their ethical concepts, conceptions and interests considerations. Construction Management and Economics, 21(1), pp. 43-67. ISSN 01446193
Holt, G D; Goulding, J and Akintoye, A (2014) Interrelationships between theory and research impact: Views from a survey of UK academics. Engineering, Construction and Architectural Management, 21(6), pp. 674-696. ISSN 0969-9988
Holumyong, C (2007) The differential impact of unemployment and the receipt of unemployment benefits between native and foreign born workers in the United States construction industry. PhD thesis, University of Utah, USA.
Hong, X and Proverbs, D (2003) Contractor relationships: A comparison in Japan, the UK and the US. Journal of Construction Procurement, 9(2), pp. 52-64. ISSN 1358-9180
Horgan, I (2014) The influence of an online collaboration tool on relationships in inter-organisational networks. PhD thesis, Victoria University, Australia.
Hosny, O A (1991) An intelligent decision support system for construction planning and scheduling. PhD thesis, University of Missouri - Rolla, USA.
Hosseini, M R; Martek, I; Chileshe, N; Zavadskas, E K and Arashpour, M (2018) Assessing the influence of virtuality on the effectiveness of engineering project networks: "Big five theory" perspective. Journal of Construction Engineering and Management, 144(7): 04018059, ISSN 0733-9364
Hoxley, M (1998) The impact of competitive fee tendering on construction professional service quality. PhD thesis, University of Salford, UK.
Hoxley, M (2000) Are competitive fee tendering and construction professional service quality mutually exclusive? Construction Management and Economics, 18(5), pp. 599-605. ISSN 01446193
Hu, M; Nippala, E; Kallioharju, K and Pelsmakers, S (2022) Monte Carlo simulation approach to understand the cost variance for energy retrofit projects: Comparative study of Finland and the United States. Construction Management and Economics, 40(3), pp. 207-222. ISSN 01446193
Huang, C; Fisher, N and Broyd, T (2002) Development of a triangular TPC model to support adoption of construction integrated system. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Huang, H; Hu, H; Xu, F and Zhang, Z (2024) Kinesiology-inspired assessment of intrusion risk based on human motion features. Journal of Construction Engineering and Management, 150(7): 04024072, ISSN 0733-9364
Huang, W; Xu, J; Zhu, D; Liu, C; Lu, J and Lu, K (2016) Multi-objective optimization of composite two-stage vibration isolation system for sensitive equipment. Journal of Engineering, Design and Technology, 14(2), pp. 343-361.
Huang, X and Hinze, J (2006) Owner's role in construction safety: Guidance model. Journal of Construction Engineering and Management, 132(2), pp. 174-181. ISSN 0733-9364
Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.
Hui, E C M and Ng, I (2009) Price discovery of property markets in Shenzhen and Hong Kong. Construction Management and Economics, 27(12), pp. 1175-1196. ISSN 1466433X
Humphrey, S D (2005) Construction procurement and profit: an analysis of the relationship from a contractor's perspective. PhD thesis, Loughborough University, UK.
Hussein, K; Akbari, H; Noorossana, R and Yadegari, R (2025) A multi-response optimization approach to mechanical properties improvement of dissimilar resistance spot welding joints. Journal of Engineering, Design and Technology, 23(2), pp. 423-441. ISSN 1726-0531
Hyun, C; Cho, K; Koo, K; Hong, T and Moon, H (2008) Effect of delivery methods on design performance in multifamily housing projects. Journal of Construction Engineering and Management, 134(7), pp. 468-482. ISSN 0733-9364
Ibrahim, A D; Price, A D F and Dainty, A R J (2006) An analysis of success factors for public private partnerships in infrastructure projects in Nigeria. Journal of Construction Procurement, 12(1),
Ibrahim, K (2019) A framework for ethical sourcing of construction materials. PhD thesis, Nelson Mandela University, South Africa.
Ibrahim, Y M (2010) On the measurement of work in progress using computer vision: A computerised reporting model. Journal of Engineering, Design and Technology, 8(1), pp. 45-63. ISSN 1726-0531
Idoro, G I (2011) Comparing occupational health and safety management efforts and performance of Nigerian construction contractors. Journal of Construction in Developing Countries, 16(2), pp. 151-173. ISSN 1823-6499
Idoro, G I (2012) The influence of project documents on the outcome of construction projects procured by traditional contracts in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 1-19. ISSN 1823-6499
Ikuabe, M O and Oke, A E (2019) Contractors’ opportunism: construction professionals’ awareness of influencing factors. Journal of Engineering, Design and Technology, 17(1), pp. 102-114. ISSN 1726-0531
Ikudayisi, A E and Adegun, O B (2025) Pathways for green building acceleration in fast-growing countries: A case study on Nigeria. Built Environment Project and Asset Management, 15(3), pp. 450-466. ISSN 2044-124X
Ilter, D and Dikbas, A (2009) An analysis of the key challenges to the widespread use of mediation in the Turkish construction industry. International Journal of Law in the Built Environment, 1(2), pp. 143-155. ISSN 1756-1450
Infante-Perea, M; Román-Onsalo, M and Navarro-Astor, E (2025) Occupational alternatives in Spanish building engineering: A gender perspective. Journal of Engineering, Design and Technology, 23(6), pp. 2005-2022. ISSN 1726-0531
Inti, S (2016) A decision making approach for selection of sustainable pavements in Texas by integrating life cycle cost analysis (LCCA), life cycle assessment (LCA) of environmental and social impacts. PhD thesis, University of Texas at El Paso, USA.
Ioannou, P G and Martinez, J C (1996) Comparison of construction alternatives using matched simulation experiments. Journal of Construction Engineering and Management, 122(3), pp. 231-241. ISSN 0733-9364
Irizarry, J; Simonsen, K L and Abraham, D M (2005) Effect of safety and environmental variables on task durations in steel erection. Journal of Construction Engineering and Management, 131(12), pp. 1310-1319. ISSN 0733-9364
Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD thesis, University of Lagos, Nigeria.
Isidore, L J (1999) Integrated range estimating and probabilistic scheduling of construction projects. PhD thesis, Texas A&M University, USA.
Isidore, L J and Back, W E (2002) Multiple simulation analysis for probabilistic cost and schedule integration. Journal of Construction Engineering and Management, 128(3), pp. 211-219. ISSN 0733-9364
Ismail, S; Musawa, M S and Ahmad, H (2019) Transparency of public private partnership (PPP): The extent of mandatory information disclosure. Built Environment Project and Asset Management, 9(5), pp. 655-668. ISSN 2044-124X
Ive, G (2006) Re-examining the costs and value ratios of owning and occupying buildings. Building Research & Information, 34(3), pp. 230-245. ISSN 0961-3218
Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.
Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.
Jalaei, F; Zoghi, M and Khoshand, A (2021) Life cycle environmental impact assessment to manage and optimize construction waste using building information modeling (BIM). International Journal of Construction Management, 21(8), pp. 784-801. ISSN 1562-3599
Jallan, Y and Ashuri, B (2020) Text mining of the securities and exchange commission financial filings of publicly traded construction firms using deep learning to identify and assess risk. Journal of Construction Engineering and Management, 146(12): 04020137, ISSN 0733-9364
Jalloul, Hiba (2024) Leveraging emergence for enhanced planning and decision-making in the built environment: Applications in resilience and sustainability planning. PhD thesis, Florida State University, USA.
Jang, J (2008) Improving the make-ready process and forecasting project performance using performance of the make-ready process. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.
Janssen, J (2000) The European construction industry and its competitiveness: A construct of the European commission. Construction Management and Economics, 18(6), pp. 711-720. ISSN 01446193
Jarkas, A M (2016) Effect of buildability on labor productivity: A practical quantification approach. Journal of Construction Engineering and Management, 142(2): 06015002, ISSN 0733-9364
Jaselskis, E J and Suazo, G A R (1994) A survey of construction site safety in Honduras. Construction Management and Economics, 12(3), pp. 245-255. ISSN 01446193
Jayawardana, J; Sandanayake, M; Jayasinghe, S; Kulatunga, A and Zhang, G (2025) Key barriers and mitigation strategies towards sustainable prefabricated construction: A case of developing economies. Engineering, Construction and Architectural Management, 32(7), pp. 4796-4833. ISSN 0969-9988
Jeelani, I; Albert, A and Gambatese, J A (2017) Why do construction hazards remain unrecognized at the work interface? Journal of Construction Engineering and Management, 143(5): 04016128, ISSN 0733-9364
Jergeas, G F and Revay, S O (1993) Quantifying construction claims using the differential cost method. Construction Management and Economics, 11(2), pp. 163-166. ISSN 01446193
Jha, K N (2005) Attributes of a project coordinator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ji, A; Xue, X; Zhang, L; Luo, X and Man, Q (2025) A transformer-based deep learning method for automatic pixel-level crack detection and feature quantification. Engineering, Construction and Architectural Management, 32(4), pp. 2455-2486. ISSN 0969-9988
Jin, R (2013) A statistical modeling approach to studying the effects of alternative and waste materials on green concrete properties. PhD thesis, Ohio State University, USA.
Jin, Z; Gambatese, J; Liu, D and Dharmapalan, V (2019) Using 4D BIM to assess construction risks during the design phase. Engineering, Construction and Architectural Management, 26(11), pp. 2637-2654. ISSN 0969-9988
Johansen, K W; Hong, K; Schultz, C and Teizer, J (2024) Automated quantification of construction workers’ exposure to falling object hazards. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 207-222. ISSN 17514304
Johansson, C (2001) A modularization approach to housing. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Johnson, G L (2020) An examination of the effect of capital structure on financial performance among construction firms in Romania 2010-2016. PhD thesis, Capella University, USA.
Jones-Crabtree, A J (2001) Decision-making variances: Creating deferred maintenance solutions using the paradigm of sustainable design. PhD thesis, Georgia Institute of Technology, USA.
Jorge, J (1990) Model of uniform cost policies and procedures for the establishment of construction equipment rates. PhD thesis, University of Florida, USA.
Joseph Oladiran, O and Rogers Simeon, D (2023) Consciousness and prospects of autoclaved aerated concrete (aac) blocks for wall construction: Comparative study Nigeria and South Africa. Journal of Construction Business and Management, 6(2), pp. 1-10. ISSN 2521-0165
Joukar, A and Nahmens, I (2016) Volatility forecast of construction cost index using general autoregressive conditional heteroskedastic method. Journal of Construction Engineering and Management, 142(1): 04015051, ISSN 0733-9364
Junga, W J (1981) The building cycle, shorter cycles of residential construction and federal housing programs: An empirical and theoretical analysis. PhD thesis, University of Connecticut, USA.
Kaka, A P F (1990) Corporate financial model for construction contractors. PhD thesis, Loughborough University, UK.
Kale, S and Arditi, D (2002) Competitive positioning in United States construction industry. Journal of Construction Engineering and Management, 128(3), pp. 238-247. ISSN 0733-9364
Kalil, A J (2002) Use of a work sampling method (TVEA) to characterize determinants of particulate exposure in heavy and highway construction. DSc thesis, University of Massachusetts Lowell, USA.
Kalu, I E and Ogbonna, N J (2021) Investigation of environmental effect of stone quarrying activities on soil and water in Akpoha and Ishiagu communities of Ebonyi State, Nigeria. International Journal of Construction Management, 21(12), pp. 1185-1199. ISSN 1562-3599
Kamma, R C and Jha, K N (2022) Quantifying building construction and demolition waste using permit data. Journal of Construction Engineering and Management, 148(9): 04022091, ISSN 0733-9364
Kang, F; Shi, Y; Li, J and Zhang, H (2025) Impacts of leader anger expressions on newcomer proactive career behavior and work alienation in the construction industry. Engineering, Construction and Architectural Management, 32(6), pp. 3659-3678. ISSN 0969-9988
Kang, Y; Kim, C; Son, H; Lee, S and Limsawasd, C (2013) Comparison of preproject planning for green and conventional buildings. Journal of Construction Engineering and Management, 139(11): 4013018, ISSN 0733-9364
Kanguwe, D F (2024) Entrepreneurial orientation and financial performance in the South African construction and materials sector: A focus on bricolage capability and absorptive capacity. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Kannan, G and Vorster, M (2000) Development of an experience database for truck loading operations. Journal of Construction Engineering and Management, 126(3), pp. 201-209. ISSN 0733-9364
Karakhan, A A and Gambatese, J A (2017) Identification, quantification, and classification of potential safety risk for sustainable construction in the United States. Journal of Construction Engineering and Management, 143(7): 04017018, ISSN 0733-9364
Karimi, H; Taylor, T R B and Goodrum, P M (2017) Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. Construction Management and Economics, 35(6), pp. 368-380. ISSN 01446193
Katz, J I (2014) Quantifying "cliffs" in design space. Journal of Engineering, Design and Technology, 12(3), pp. 374-388.
Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.
Kayan, B A (2017) Green maintenance for heritage buildings: Paint repair appraisal. International Journal of Building Pathology and Adaptation, 35(1), pp. 63-89.
Kayan, B A and Ashraf, N N (2023) Evaluating the environmental maintenance impact (EMI): A carbon life cycle assessment (LCA) of the singgora roof tiles repair in heritage buildings. International Journal of Building Pathology and Adaptation, 41(5), pp. 905-925. ISSN 23984708
Kayan, B A; Forster, A M and Banfill, P F G (2016) Green maintenance for historic masonry buildings: An option appraisal approach. Smart and Sustainable Built Environment, 5(2), pp. 143-164. ISSN 2046-6099
Kazaz, A; Ulubeyli, S and Arslan, A (2020) Quantification of fresh ready-mix concrete waste: Order and truck-mixer based planning coefficients. International Journal of Construction Management, 20(1), pp. 53-64. ISSN 1562-3599
Keller, E C (1999) Prevailing wage rates: The effects on school construction, levels of taxation, and state reimbursements. DEd thesis, Pennsylvania State University, USA.
Kermanshachi, S; Dao, B; Rouhanizadeh, B; Shane, J and Anderson, S (2020) Development of the project complexity assessment and management framework for heavy industrial projects. International Journal of Construction Education and Research, 16(1), pp. 24-42. ISSN 1557-8771
Khaemba, P (2013) Adoption of green building practices and rating system in Kenya: Potentials and barriers. PhD thesis, North Carolina Agricultural and Technical State University, USA.
Khajehzadeh, I and Vale, B (2017) How house size impacts type, combination and size of rooms: A floor plan study of New Zealand houses. Architectural Engineering and Design Management, 13(4), pp. 291-307. ISSN 1745-2007
Khalil, A (2018) Developing a strategy for the implementation of sustainable construction practices in Libya. PhD thesis, University of Salford, UK.
Khan, A; Do, J and Kim, D (2017) Experimental optimization of high-strength self-compacting concrete based on D-optimal design. Journal of Construction Engineering and Management, 143(4): 04016108, ISSN 0733-9364
Khanh, H. D.; Tiep, N. V. and Nguyen, K. V. (2026) EFA models for evaluating stakeholder perceptions of falls-from-height risks in building projects: A case study from Vietnam. Journal of Engineering, Design and Technology, 24(6), pp. 1483-1509. ISSN 1726-0531
Khanh, H D and Kim, S Y (2015) Development of waste occurrence level indicator in Vietnam construction industry. Engineering, Construction and Architectural Management, 22(6), pp. 715-731. ISSN 0969-9988
Khatibi, H; Wilkinson, S; Baghersad, M; Heiman, D; Ramli, H; Suhatril, M; Javanmardi, A and Ghaedi, K (2021) The resilient-smart city development: A literature review and novel frameworks exploration. Built Environment Project and Asset Management, 11(4), pp. 493-510. ISSN 2044-124X
Khoshfetrat, R; Sarvari, H; Chan, D W M and Rakhshanifar, M (2022) Critical risk factors for implementing building information modelling (BIM): A Delphi-based survey. International Journal of Construction Management, 22(12), pp. 2375-2384. ISSN 1562-3599
Kibwami, N (2016) Enhancing sustainable construction in the building sector of Uganda using embodied carbon accounting. PhD thesis, University of Leeds, UK.
Kibwami, N and Tutesigensi, A (2014) Mathematical modelling of embodied carbon emissions of building projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Killingsworth, J and Mehany, M H (2018) Implications of collection period variance in the construction industry. Journal of Financial Management of Property and Construction, 23(3), pp. 330-348. ISSN 1366-4387
Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Kim, J; Ham, Y; Chung, Y and Chi, S (2019) Systematic camera placement framework for operation-level visual monitoring on construction jobsites. Journal of Construction Engineering and Management, 145(4): 04019019, ISSN 0733-9364
Kim, J; Shan, Y; Kim, S; Song, D; Park, H and Bang, C (2021) Factors influencing fire safety on building construction sites: A fire officer's perspective. Journal of Construction Engineering and Management, 147(10): 04021118, ISSN 0733-9364
Kim, J I (2014) Methodology for the application of BIM-based decision support methods to evaluate sustainability metrics for master plans of a large-scale development. DEng thesis, Stanford University, USA.
Kim, M (2017) Noncontact quality assessment of precast concrete elements using 3D laser scanning and building information modeling. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Kim, S; Lee, S and Kim, J (2011) Relationship between the financial crisis of Korean construction firms and macroeconomic fluctuations. Engineering, Construction and Architectural Management, 18(4), pp. 406-422. ISSN 0969-9988
Kim, Y A; Ryoo, B Y; Kim, Y S and Huh, W C (2013) Major accident factors for effective safety management of highway construction projects. Journal of Construction Engineering and Management, 139(6), pp. 628-640. ISSN 0733-9364
Kim, Y-W (2002) The implications of a new production paradigm for project cost control. PhD thesis, University of California, Berkeley, USA.
King, S S; Rahman, R A; Fauzi, M A and Haron, A T (2022) Critical analysis of pandemic impact on AEC organizations: The COVID-19 case. Journal of Engineering, Design and Technology, 20(1), pp. 358-383. ISSN 1726-0531
King Lewis, A and Shan, Y (2024) Persistence of women in the construction industry. Journal of Construction Engineering and Management, 150(7): 04024061, ISSN 0733-9364
Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach. PhD thesis, Nottingham Trent University, UK.
Kishore, V; Abraham, D M and Sinfield, J V (2011) Portfolio cash assessment using fuzzy systems theory. Journal of Construction Engineering and Management, 137(5), pp. 333-343. ISSN 0733-9364
Kleps, S M (2013) Impact of workflow disruptions, project characteristics and foremen characteristics on improvisational decisions and actions on construction sites. PhD thesis, Illinois Institute of Technology, USA.
Koch, C (2018) Productivity measurement: The social construction of reduction through expansion. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Koch, D C; Greenan, J and Newton, K (2009) Factors that influence students’ choice of careers in construction management. International Journal of Construction Education and Research, 5(4), pp. 293-307. ISSN 1557-8771
Komolafe, M O; Oyewole, M O and Gbadegesin, J T (2020) Stakeholders' relevance in sustainable residential property development. Smart and Sustainable Built Environment, 9(2), pp. 112-129. ISSN 2046-6099
Konanahalli, A and Oyedele, L O (2016) Emotional intelligence and British expatriates' cross-cultural adjustment in international construction projects. Construction Management and Economics, 34(11), pp. 751-768. ISSN 01446193
Kongela, S M (2023) Sustainability potential awareness among built environment stakeholders: Experience from Tanzania. International Journal of Building Pathology and Adaptation, 41(2), pp. 301-319. ISSN 23984708
Kori, S i (2017) BIM business value creation for SME architectural firms in Nigeria using intellectual capital development. PhD thesis, University of Liverpool, UK.
Kostuk, K J (2003) Quantifying the uncertainty associated with long-term maintenance contracts. PhD thesis, University of Saskatchewan, Canada.
Kraidi, Layth (2020) Development of an integrated risk management framework for oil and gas pipeline projects. PhD thesis, Liverpool John Moores University, UK.
Kukah, A S K; Owusu-Manu, D G; Badu, E and Edwards, D J (2024) Reasons for entering into Ghanaian public-private partnership (PPP) power projects. Journal of Engineering, Design and Technology, 22(3), pp. 854-878. ISSN 1726-0531
Kulaksiz, T (2019) Analysis of factors influencing return on investment (ROI) for building information modeling (BIM) implementation. PhD thesis, Wayne State University, USA.
Kumar, R; Chandrashekhar, I K and Singh, S P (2017) Quantification of construction project risks by analysis of past dispute cases. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kumaraswamy, M M; Nadarajah, R; Palaneeswaran, E and Rahman, M M (2001) Dealing with delays in evaluating extensions of time. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kwasafo, O K; Adinyira, E and Agyekum, K (2024) Impact of green construction procurement practices on the success of circular economy in Ghana. Built Environment Project and Asset Management, 14(5), pp. 765-781. ISSN 2044-124X
Kwofie, T E; Aigbavboa, C O and Thwala, W D (2020) Measures to improve the adoption of life cycle assessment in the South African construction industry. Journal of Engineering, Design and Technology, 18(2), pp. 480-494. ISSN 1726-0531
La, Anh Tuan (2016) Principal factors for public-private partnership (ppp) implementation in Vietnam: A mixed methods study. PhD thesis, University of Technology Sydney, Australia.
Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.
Lan, Roy Uzoma (2025) Advancing workplace safety through intelligent monitoring: Applications of artificial intelligence and computer vision in high-risk industrial environments. PhD thesis, The University of Texas at San Antonio, USA.
Larsen, G D (2005) A polymorphic framework for understanding the diffusion of innovations. Unpublished PhD thesis, University of Reading, UK.
Lataniotis, C (2019) Data-driven uncertainty quantification for high-dimensional engineering problems. DSc thesis, ETH Zürich, Switzerland.
Lau, J L; Hashim, A H; Samah, A A and Salim, A S S (2016) Understanding the environmental worldviews of Malaysian project managers. Smart and Sustainable Built Environment, 5(4), pp. 307-324. ISSN 2046-6099
Laufer, A and Cohenca, D (1990) Factors affecting construction-planning outcomes. Journal of Construction Engineering and Management, 116(1), pp. 135-156. ISSN 0733-9364
Laurent, J and Leicht, R M (2019) Practices for designing cross-functional teams for integrated project delivery. Journal of Construction Engineering and Management, 145(3): 05019001, ISSN 0733-9364
Lawani, A (2018) Investigating project management practice in Nigerian government construction organisations: a systems thinking approach. PhD thesis, Robert Gordon University, UK.
Lawrence, K; Chan, P W and James, A (2016) Absorptive capacity as a basis for construction innovation: From a capabilities to a routines perspective. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Le, D A; Dang, C N; Le-Hoai, L and Hoang, V Q (2025) Influences of critical success factors on nonprofit outcomes of oda education construction projects: A case of Vietnam. Journal of Engineering, Design and Technology, 23(5), pp. 1423-1446. ISSN 1726-0531
Le, T. T. and Nguyen, L. H. (2026) Modeling the external drivers of green building investment: A PLS-SEM analysis of subjective norms. International Journal of Building Pathology and Adaptation, pp. 1-20. ISSN 2398-4708
Le, C; Jeong, H D; Damnjanovic, I and Bukkapatnam, S (2022) Pareto principle in scoping-phase cost estimating: A multiobjective optimization approach for selecting and applying optimal major work items. Journal of Construction Engineering and Management, 148(8): 04022076, ISSN 0733-9364
Le, C; Le, T; Jeong, H D and Lee, E B (2019) Geographic information system-based framework for estimating and visualizing unit prices of highway work items. Journal of Construction Engineering and Management, 145(8): 04019044, ISSN 0733-9364
Lee, E B; Lee, H and Ibbs, C W (2007) Productivity aspects of urban freeway rehabilitation with accelerated construction. Journal of Construction Engineering and Management, 133(10), pp. 798-806. ISSN 0733-9364
Lee, K W; Han, S H; Park, H and David Jeong, H (2016) Empirical analysis of host-country effects in the international construction market: An industry-level approach. Journal of Construction Engineering and Management, 142(3): 04015092, ISSN 0733-9364
Lee, N; Lee, L W and Kovel, J (2016) An experimental study of instructional pedagogies to teach math-related content knowledge in construction management education. International Journal of Construction Education and Research, 12(4), pp. 255-269. ISSN 1557-8771
Lee, S (2007) Understanding and quantifying the impact of changes on construction labor productivity: Integration of productivity factors and quantification methods. PhD thesis, University of California, Berkeley, USA.
Lee, S H (2009) Computational fieldwork support for efficient operation and maintenance of mechanical, electrical and plumbing systems. PhD thesis, Carnegie Mellon University, USA.
Lee, S M and Olson, D L (1983) Chance constrained aggregate blending. Journal of Construction Engineering and Management, 109(1), pp. 39-47. ISSN 0733-9364
Lee, S-H (2012) Management of building energy consumption and energy supply network on campus scale. PhD thesis, Georgia Institute of Technology, USA.
Lee, Z P; Rahman, R A and Doh, S I (2021) Key drivers for adopting design-build in public construction projects: Malaysian perspective. Journal of Construction in Developing Countries, 26(1), pp. 131-160. ISSN 1823-6499
Lehtonen, J L and Kiiras, J M (2010) Cost modelling in underpinning projects. Construction Management and Economics, 28(9), pp. 985-995. ISSN 1466433X
Leo-olagbaye, F and Odeyinka, H A (2018) Evaluation of risk factors and their impact on road projects. Journal of Construction Business and Management, 2(2), pp. 24-35. ISSN 2521-0165
Lertpaitoonpan, W (2000) Bridge damage detection using a system identification method. PhD thesis, University of Florida, USA.
Leung, M-K and Shing, G T-y (1999) The growing mortgage market in China. Journal of Financial Management of Property and Construction, 4(2), pp. 33-48. ISSN 1366-4387
Lewis, P; Rasdorf, W; Frey, H C; Pang, S H and Kim, K (2009) Requirements and incentives for reducing construction vehicle emissions and comparison of nonroad diesel engine emissions data sources. Journal of Construction Engineering and Management, 135(5), pp. 341-351. ISSN 0733-9364
Li, B; Akintoye, A and Hardcastle, C (2002) Risks and risk treatments in public private partnership projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Li, I H Y (2012) The relationship of cultural incongruence and information processing in facilities management in the public health care sector. PhD thesis, University of Hong Kong, Hong Kong.
Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.
Li, J; Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(3), pp. 242-253. ISSN 0969-9988
Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.
Li, W; Zhang, Y; Lu, D and Augenbroe, G (2020) Quantification methods of natural ventilated building performance in preliminary design. Building Research & Information, 48(4), pp. 401-414. ISSN 0961-3218
Li, Y (2013) Developing a sustainable construction waste estimation and management system. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Li, Z and Tong, X (2017) Applications of the discrete element method and Fibonacci sequence on a banana screen. Journal of Engineering, Design and Technology, 15(1), pp. 2-12.
Liang, D (2001) Improved reliability and economic modeling for new and retrofitted low-rise structures subjected to extreme wind hazards. PhD thesis, State University of New York at Buffalo, USA.
Liddiard, R (2014) Room-scale profiles of space use and electricity consumption in non-domestic buildings. Building Research & Information, 42(1), pp. 72-94. ISSN 0961-3218
Lijauco, F; Gajendran, T; Brewer, G and Rasoolimanesh, S M (2020) Impacts of culture on innovation propensity in small to medium enterprises in construction. Journal of Construction Engineering and Management, 146(3): 04019116, ISSN 0733-9364
Lin Lee, C and Hwa Ting, K (2009) The role of Malaysian securitised real estate in a mixed asset portfolio. Journal of Financial Management of Property and Construction, 14(3), pp. 208-230. ISSN 1366-4387
Lindebaum, D (2008) Trait emotional intelligence, transformational leadership and performance in the UK construction industry. PhD thesis, University of Manchester, UK.
Lingard, H; Cooke, T and Blismas, N (2011) Coworkers' response to occupational health and safety: An overlooked dimension of group-level safety climate in the construction industry. Engineering, Construction and Architectural Management, 18(2), pp. 159-175. ISSN 0969-9988
Lingard, H; Pirzadeh, P and Oswald, D (2019) Talking safety: Health and safety communication and safety climate in subcontracted construction workgroups. Journal of Construction Engineering and Management, 145(5): 04019029, ISSN 0733-9364
Liu, A M M; Fellows, R and Ng, J (2004) Surveyors' perspectives on ethics in organisational culture. Engineering, Construction and Architectural Management, 11(6), pp. 438-449. ISSN 0969-9988
Liu, Chang (2020) Data-driven strategies to improve the construction equipment management. PhD thesis, University of Alberta, Canada.
Liu, D (2009) Multi-phase empirical investigation and path modeling of construction workers' use of personal fall arrest systems. PhD thesis, Ohio State University, USA.
Liu, D and Li, C (2025) Construction hazard-recognition training for generation Z students: A comparison study based on eye-movement data. Engineering, Construction and Architectural Management, 32(6), pp. 4029-4050. ISSN 0969-9988
Liu, H; Song, J and Wang, G (2020) Development of a tool for measuring building information modeling (BIM) user satisfaction: method selection, scale development and case study. Engineering, Construction and Architectural Management, 27(9), pp. 2409-2427. ISSN 0969-9988
Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Investment apportionments among participants of PPP rental retirement villages. Built Environment Project and Asset Management, 10(1), pp. 64-77. ISSN 2044-124X
Locay, A (2012) An examination of collective behavior, optimism, uncertainty and their effects on corporate strategies in the home building industry. PhD thesis, Nova Southeastern University, USA.
Lonsdale, J H (2004) Situational awareness and risk perception of operatives using portable ladders in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Loosemore, M and Alkilani, S (2022) The collaborative challenges of social procurement. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Loosemore, M and Lim, B T-H (2016) Intra-organisational injustice in the construction industry. Engineering, Construction and Architectural Management, 23(4), pp. 428-447. ISSN 0969-9988
Lopane, F D (2022) Spatial optimisation for resilient infrastructure services. PhD thesis, University of Newcastle upon Tyne, UK.
Love, P E D (2002) Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 18-29. ISSN 0733-9364
Love, P E D and Edwards, D J (2005) Taking the pulse of UK construction project managers' health: Influence of job demands, job control and social support on psychological wellbeing. Engineering, Construction and Architectural Management, 12(1), pp. 88-101. ISSN 0969-9988
Love, P E D; Edwards, D J; Watson, H and Davis, P (2010) Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), pp. 275-282. ISSN 0733-9364
Love, P E D and Teo, P (2017) Statistical analysis of injury and nonconformance frequencies in construction: Negative binomial regression model. Journal of Construction Engineering and Management, 143(8): 05017011, ISSN 0733-9364
Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.
Lucko, G; Helinski, P O and Ballesteros-Pérez, P (2026) Universal model for performance and delay tracking of linear construction schedules. Journal of Construction Engineering and Management, 152(5): 04026035, ISSN 0733-9364
Luo, M.; Xie, Y.; Xie, P. and Liu, X. (2026) Intergenerational knowledge transfer in the construction industry: The role of digital intelligence and temporal social comparison. Engineering, Construction and Architectural Management, 33(7), pp. 6069-6086. ISSN 0969-9988
Lützkendorf, T (2020) The role of carbon metrics in supporting built-environment professionals. Buildings & Cities, 1(1), pp. 662-672. ISSN 2632-6655
Maaith, N. and Sharmin, T. (2026) Socio-technical drivers of energy use in low-income housing in Jordan: Insights from a regression-based study. Building Research & Information, 54(4), pp. 510-533. ISSN 0961-3218
Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions. PhD thesis, University of Bath, UK.
Maemura, Y; Kim, E and Ozawa, K (2018) Root causes of recurring contractual conflicts in international construction projects: Five case studies from Vietnam. Journal of Construction Engineering and Management, 144(8): 05018008, ISSN 0733-9364
Mah, D; Manrique, J D; Yu, H; Al-Hussein, M and Nasseri, R (2011) House construction CODN2/DN footprint quantification: A BIM approach. Construction Innovation, 11(2), pp. 161-178. ISSN 1471-4175
Mah, D E (2011) Framework for rating the sustainability of the residential construction practice. PhD thesis, University of Alberta, Canada.
Mahamadu, A-M (2017) Development of a decision support framework to aid selection of construction supply chain organisations for BIM-enabled projects. PhD thesis, University of the West of England, Bristol, UK.
Mahdi Hosseinian, S; Farahpour, E and Carmichael, D G (2020) Optimum outcome-sharing construction contracts with multiagent and multioutcome arrangements. Journal of Construction Engineering and Management, 146(7): 04020067, ISSN 0733-9364
Maina, J J (2024) Modelling business performance from marketing practices of architecture firms in Nigeria. Journal of Financial Management of Property and Construction, 29(3), pp. 425-443. ISSN 1366-4387
Majzoub, Omar (2025) A precursor to computation in architecture – an alternative to the current concept design process. PhD thesis, University of New South Wales, Australia.
Makabate, C T (2021) Investigating the adoption of building information modelling (BIM) within the small medium enterprises (SMEs) in contracting and consulting organisatios in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Malabi Eberhardt, L C; Kuittinen, M; Häkkinen, T; Moinel, C; Nibel, S and Birgisdottir, H (2024) Carbon handprint: A review of potential climate benefits of buildings. Building Research & Information, 52(6), pp. 708-723. ISSN 0961-3218
Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.
Maleki, B; Casanovas-Rubio, M D M and Fuente Antequera, A D L (2022) Sustainability assessment in residential high-rise building design: State of the art. Architectural Engineering and Design Management, 18(6), pp. 927-940. ISSN 1745-2007
Malla, V; K.V, P and Delhi, V S K (2026) Analysing inhibitors to BIM implementation: A social network theoretical perspective. Construction Innovation, 26(1), pp. 198-218. ISSN 1471-4175
Mamphey, S A (2024) A framework for the implementation of international construction ethics standards in Sub-Sahara Africa: The case of Ghana. PhD thesis, Nottingham Trent University, UK.
Mangano, G; Castelblanco, G; De Marco, A and Ottaviani, F M (2025) Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), pp. 193-210. ISSN 2044-124X
Mardikoraem, M (2021) Essays on decision problems under uncertainty. PhD thesis, University of Wisconsin - Milwaukee, USA.
Markus, A M (1988) A research discrepancy model for building trades training programs. PhD thesis, University of Florida, USA.
Marsh, L (1998) Portable datafiles in the construction supply chain. PhD thesis, University of Reading, UK.
Marsh, L and Finch, E (1998) Attitudes towards auto-ID technologies within the UK construction industry. Construction Management and Economics, 16(4), pp. 383-388. ISSN 01446193
Martin, H; Lewis, T; Peters, E and Petersen, A (2017) Construction project delivery cloud decisionsupport model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 6-26. ISSN 17514304
Martin, H; Lewis, T M and Petersen, A (2016) Factors affecting the choice of construction project delivery in developing oil and gas economies. Architectural Engineering and Design Management, 12(3), pp. 170-188. ISSN 1745-2007
Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(1), pp. 90-108. ISSN 1471-4175
Mason, G E (1973) A quantitative risk management approach to the selection of construction contract provisions. PhD thesis, Stanford University, USA.
Mason, J (1999) The impact of total quality management on construction worker safety. PhD thesis, University of South Florida, USA.
Mastrandrea, F (1991) The quantification of construction contractors' claims. PhD thesis, University of Reading, UK.
Masu, S; Gichunge, H and K'Akumu, O A (2012) Component ratios of new building costs in Nairobi: A contractors' perspective. Journal of Financial Management of Property and Construction, 17(3), pp. 222-234. ISSN 1366-4387
Matar, M; Osman, H; Georgy, M; Abou-Zeid, A and Elsaid, M (2020) Evaluating the environmental performance of pipeline construction using systems modelling. Construction Management and Economics, 38(8), pp. 689-714. ISSN 01446193
Maund, K; Gajendran, T and Brewer, G (2014) Examining the barriers to successful onsite construction environmental management operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Mayo, R E (1992) Improved optimum bid markup estimation through work load related bid distribution functions. PhD thesis, Stevens Institute of Technology, USA.
Mazher, K M; Chan, A P C; Zahoor, H; Khan, M I and Ameyaw, E E (2018) Fuzzy integral-based risk-assessment approach for public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 144(12): 04018111, ISSN 0733-9364
Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.
McCabe, B Y; Alderman, E; Chen, Y; Hyatt, D E and Shahi, A (2017) Safety performance in the construction industry: Quasi-longitudinal study. Journal of Construction Engineering and Management, 143(4): 04016113, ISSN 0733-9364
McCarthy C, T D D A (2013) Mainstreaming equality in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
McClements, S (2013) Modelling construction consultant selection based on attributes of trust. PhD thesis, University of Ulster, UK.
McElroy, D J and Rosenow, J (2019) Policy implications for the performance gap of low-carbon building technologies. Building Research & Information, 47(5), pp. 611-623. ISSN 0961-3218
McGill, G; Oyedele, L O and McAllister, K (2015) An investigation of indoor air quality, thermal comfort and sick building syndrome symptoms in UK energy efficient homes. Smart and Sustainable Built Environment, 4(3), pp. 329-348. ISSN 2046-6099
Melhem, N N; Maher, R A and Sundermeier, M (2021) Waste-based management of steel reinforcement cutting in construction projects. Journal of Construction Engineering and Management, 147(7): 04021056, ISSN 0733-9364
Melia, K (2005) Exploring and modelling the process of change management in construction organisations. PhD thesis, University of Dundee, UK.
Menches, C L (2006) Effect of pre-construction planning on electrical project performance. PhD thesis, University of Wisconsin - Madison, USA.
Meng, S (2023) Development of a regional wind risk assessment framework for wood-frame single-family residential building stock. PhD thesis, University of California, Los Angeles, USA.
Mengistu, D G and Mahesh, G (2020) Dimensions for improvement of construction management practice in Ethiopian construction industry. Journal of Engineering, Design and Technology, 18(1), pp. 21-39. ISSN 1726-0531
Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988
Miceli, A; Bevill, G and Simsiriwong, J (2025) Effect of additively manufactured polymeric inserts on impact response of construction safety helmets. Journal of Engineering, Design and Technology, 23(5), pp. 1653-1665. ISSN 1726-0531
Mihara, H; Yoshida, T; Suzuki, K and Hojo, T (2012) A study on new construction techniques and skills training with focus on the plastering subcontractor in Japan. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Mikulić, D; Lovrinčević, Ž and Keček, D (2021) Valorization of economic effects from the programme of energy renovation of public buildings in Croatia. Building Research & Information, 49(5), pp. 561-573. ISSN 0961-3218
Mimendi Cruz, Jose Leonel (2021) Digital workflow for the design, construction and management of natural bamboo pole structures. PhD thesis, University College London, UK.
Min, J U (2004) Supply chain visualization through web services integration. PhD thesis, Stanford University, USA.
Minato, T (1994) A methodology for project risk control: A work package-based approach using historical cost control data. PhD thesis, University of California, Berkeley, USA.
Minato, T and Ashley, D B (1998) Data-driven analysis of corporate risk using historical cost-control data. Journal of Construction Engineering and Management, 124(1), pp. 42-47. ISSN 0733-9364
Minchin, R E; Li, X; Issa, R R and Vargas, G G (2013) Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida. Journal of Construction Engineering and Management, 139(10): 04013007, ISSN 0733-9364
Mirzaei, A; Nasirzadeh, F; Parchami Jalal, M and Zamani, Y (2018) 4D-BIM dynamic time-space conflict detection and quantification system for building construction projects. Journal of Construction Engineering and Management, 144(7): 04018056, ISSN 0733-9364
Moeti, M; Jacques, E; Feng, W and North, C (2021) Modelling the effect of computation sampling on insight error in computational fluid dynamics scientific simulation. Journal of Engineering, Design and Technology, 19(1), pp. 263-290. ISSN 1726-0531
Mohammed Alashwal, A M (2012) Developing a project learning model considering fragmentation in construction. PhD thesis, University of Malaya, Malaysia.
Molenaar, K R (1997) Public sector design-build: A model for project selection. PhD thesis, University of Colorado at Boulder, USA.
Molenaar, K R and Songer, A D (1998) Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6), pp. 467-479. ISSN 0733-9364
Momade, M H; Durdyev, S; Van Tam, N; Shahid, S; Mbachu, J and Momade, Y (2024) Factors influencing adoption of construction technologies in Vietnam's residential construction projects. International Journal of Building Pathology and Adaptation, 42(5), pp. 1002-1018. ISSN 2398-4708
Momtaz, M (2023) Damage life cycle analysis for present and future condition assessments using statistical and machine learning techniques. PhD thesis, George Mason University, USA.
Montemanni, R; Toklu, N E; Toklu, S C and Toklu, Y C (2012) Aggregate blending via robust linear programming. Journal of Construction Engineering and Management, 138(2), pp. 188-196. ISSN 0733-9364
Moradipour, P; Noorzaei, J; Jaafar, M S and Aziz, F N A A (2013) An improved computational method in structural dynamics. Journal of Engineering, Design and Technology, 11(3), pp. 288-315. ISSN 1726-0531
Morledge, R (2011) Colleges as agents for construction innovation. Construction Innovation, 11(4), pp. 441-451. ISSN 1471-4175
Morrow, T K (1998) Effects of selected practices on project cost performance. PhD thesis, University of Texas at Austin, USA.
Mostafavi, A; Valentin, V; Abraham, D M and Louis, J (2012) Assessment of the productivity of nighttime asphalt paving operations. Journal of Construction Engineering and Management, 138(12), pp. 1421-1432. ISSN 0733-9364
Moura, H and Teixeira, J C (2007) Types of construction claims: A Portuguese survey. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Mubarak, A M (2018) The relationship between determinants of risk governance assurance and efficacy of the public projects in the government of Dubai from the perspective of internal audit function. PhD thesis, British University in Dubai, UAE.
Munir, M (2020) Development of a building information modelling asset value realisation model. PhD thesis, University of Liverpool, UK.
Munir, Mustapha (2020) Development of a building information modelling asset (bimasset) value realisation model. PhD thesis, University of Liverpool, UK.
Murguia, D; Demian, P and Soetanto, R (2021) Systemic BIM adoption: A multilevel perspective. Journal of Construction Engineering and Management, 147(4): 04021014, ISSN 0733-9364
Mushtaq, K A B; Hassan, M U; Ahmad, T and Choudhry, R M (2026) Impact of BIM on quality of planning and design in highway infrastructure projects: SEM-based inquiry. Journal of Construction Engineering and Management, 152(2): 04025262, ISSN 0733-9364
Mutai, A (2009) Factors influencing the use of building information modeling (BIM) within leading construction firms in the United States of America. PhD thesis, Indiana State University, USA.
Muya, M (1999) A systematic approach for improving construction materials logistics. PhD thesis, Loughborough University, UK.
Mwanaumo, E M and Mambwe, M (2019) Effect of management strategies in entrenching organisational safety culture in the electricity industry of Zambia. Journal of Construction Business and Management, 3(1), pp. 27-37. ISSN 2521-0165
Mwelu, N; Watundu, S and Moya, M (2024) Demand side perception on success factors for implementing public road construction projects. Journal of Construction in Developing Countries, 29(1), pp. 1-22. ISSN 1823-6499
Na, R (2013) Property rights analysis of building material pricing. PhD thesis, University of Hong Kong, Hong Kong.
Nabizadeh, M; Khalilzadeh, M; Ebrahimnejad, S and Ershadi, M J (2021) Developing a fuzzy goal programming model for health, safety and environment risks based on hybrid fuzzy FMEA-vikor method. Journal of Engineering, Design and Technology, 19(2), pp. 317-338. ISSN 1726-0531
Nadhim, E A; Hon, C; Xia, B; Stewart, I and Fang, D (2018) Investigating the relationships between safety climate and safety performance indicators in retrofitting works. Construction Economics and Building, 18(2), pp. 110-129. ISSN 2204-9029
Naismith, N; Price, A D F; Dainty, A R J; Bryman, A; Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(2),
Napolitan, C L (1995) Improvement to the forecast precision of the factor model for masonry productivity. PhD thesis, Pennsylvania State University, USA.
Nasirzadeh, F; Carmichael, D G; Jarban, M J and Rostamnezhad, M (2019) Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims. Engineering, Construction and Architectural Management, 26(7), pp. 1261-1276. ISSN 0969-9988
Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation. PhD thesis, University of Maryland, College Park, USA.
Newaz, M T; Davis, P; Jefferies, M and Pillay, M (2020) Examining the psychological contract as mediator between the safety behavior of supervisors and workers on construction sites. Journal of Construction Engineering and Management, 146(1): 04019094, ISSN 0733-9364
Newaz, M T; Jefferies, M; Davis, P R and Pillay, M (2021) Managerial implications for construction practices as a consequence of using a psychological contract of safety. Engineering, Construction and Architectural Management, 28(4), pp. 1134-1155. ISSN 0969-9988
Ng, F P (2003) Quantity and pricing decisions in the presence of advance contracts. PhD thesis, Stanford University, USA.
Ng, S T; Chen, S E; McGeorge, D; Lam, K C and Evans, S (2001) Current state of IT usage by Australian subcontractors. Construction Innovation, 1(1), pp. 3-13. ISSN 1471-4175
Nguyen, L d (2007) The dynamics of float, logic, resource allocation, and delay timing in forensic schedule analysis and construction delay claims. PhD thesis, University of California, Berkeley, USA.
Nidhin, B K S N; Domingo, N; Bui, T T P and Wilkinson, S (2025) Construction stakeholders' knowledge on zero carbon initiatives in New Zealand. International Journal of Building Pathology and Adaptation, 43(3), pp. 512-527. ISSN 2398-4708
Nigaglioni, R (2016) The relationship between the emotional intelligence of managers and the success of construction projects. DBA thesis, Northcentral University, USA.
Niroshana, N; Siriwardana, C and Jayasekara, R (2023) The impact of COVID-19 on the construction industry and lessons learned: A case of Sri Lanka. International Journal of Construction Management, 23(15), pp. 2521-2538. ISSN 1562-3599
Niu, Y; Li, H; Luo, X and Deng, X (2024) Coopetition configuration and performance of international joint ventures for high-speed rail projects. Engineering, Construction and Architectural Management, 31(9), pp. 3748-3772. ISSN 0969-9988
Nixon, A M (2002) The selection of architectural firms in Indiana school construction projects. EdD thesis, Ball State University, USA.
Nnaji, C; Gambatese, J; Karakhan, A and Eseonu, C (2019) Influential safety technology adoption predictors in construction. Engineering, Construction and Architectural Management, 26(11), pp. 2655-2681. ISSN 0969-9988
Nwal, S S; Panuwatwanich, K and Naing, M (2024) Critical factors influencing the performance of public housing construction projects in Myanmar. Journal of Construction in Developing Countries, 29(1), pp. 163-190. ISSN 1823-6499
Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality. DPhil thesis, University of Johannesburg, South Africa.
Obunwo, C U C (2016) A framework for enhancing project quality and customer satisfaction in government road construction projects in Rivers State, Nigeria. PhD thesis, University of Wolverhampton, UK.
Odeh, I S M (2010) Evaluation of glare and lighting performance in nighttime highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387
Odeyinka, H A; Kaka, A and Marledge, R (2003) An evaluation of construction cash flow management approaches in contracting oraganizations. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Odeyinka, H A; Lowe, J and Kaka, A (2008) An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 13(1), pp. 5-17. ISSN 1366-4387
Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Ofori, G (1994) Construction industry development: Role of technology transfer. Construction Management and Economics, 12(5), pp. 379-392. ISSN 01446193
Ogbu, C P (2018) Survival practices of indigenous construction firms in Nigeria. International Journal of Construction Management, 18(1), pp. 78-91. ISSN 1562-3599
Okafor, C C; Sydney Ani, U and Ugwu, O (2024) Critical solutions to the lapses of supply chain management in Nigeria's construction industry. International Journal of Building Pathology and Adaptation, 42(4), pp. 768-787. ISSN 23984708
Oke, A E; Aliu, J O; Tamunosa Ojurongbe, E; Aigbavboa, C O; Aghimien, D O and Ebekozien, A (2026) Investigation of core and future competencies needed for quantity surveyors in Nigeria. International Journal of Construction Education and Research, 22(1), pp. 119-137. ISSN 1557-8771
Oko, J A (2008) Ethical behaviour of Nigerian building industry professionals in the procurement of building projects. PhD thesis, University of Lagos, Nigeria.
Okoro, C S; Nnaji, C and Adediran, A (2023) Determinants of immersive technology acceptance in the construction industry: Management perspective. Engineering, Construction and Architectural Management, 30(7), pp. 2645-2668. ISSN 0969-9988
Okpala, I; Nnaji, C and Awolusi, I (2022) Wearable sensing devices acceptance behavior in construction safety and health: Assessing existing models and developing a hybrid conceptual model. Construction Innovation, 22(1), pp. 57-75. ISSN 1471-4175
Okpala, I U (2022) Robotics and automation in construction: Developing foundational insight and tools to support safe implementation. PhD thesis, University of Alabama, USA.
Oktora, S I; Wulansari, I Y; Siagian, T H; Laksono, B C; Sugiandewi, N N R and Anindita, N (2024) Identifying the potential participation in natural disaster insurance: First attempt based on a national socio-economic survey in Indonesia. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 177-192. ISSN 1759-5916
Olanrewaju, A and Tan, S Y (2018) An exploration into design criteria for affordable housing in Malaysia. Journal of Engineering, Design and Technology, 16(3), pp. 360-384. ISSN 1726-0531
Olanrewaju, O I; Chileshe, N; Babarinde, S A and Sandanayake, M (2020) Investigating the barriers to building information modeling (BIM) implementation within the Nigerian construction industry. Engineering, Construction and Architectural Management, 27(10), pp. 2931-2958. ISSN 0969-9988
Olasunkanmi, F. F. O. (2026) Structural equation modelling for the impacts of transactional leadership styles on project performance. Construction Economics and Building, 26(2), ISSN 2204-9029
Olatunde, N A (2024) Stakeholder management strategies employed on building projects procured by private corporate organisations in south-Western Nigeria. International Journal of Building Pathology and Adaptation, 42(3), pp. 430-447. ISSN 23984708
Olatunde, N A; Fidelis, I M; Awodele, I A and Adebayo, B O (2024) Stakeholders prioritization of key performance indicators on public and private tertiary educational projects in Osun State, Nigeria. International Journal of Building Pathology and Adaptation, 42(5), pp. 881-892. ISSN 2398-4708
Olatunde, N A and Odeyinka, H A (2021) Extent of stakeholder management practices in building projects procured by private corporate organisations in Nigeria. Built Environment Project and Asset Management, 11(5), pp. 819-834. ISSN 2044-124X
Olatunji, O A and Ramanayaka, C E D (2023) Client attributes that motivate contractors' bid decision. Built Environment Project and Asset Management, 13(6), pp. 799-812. ISSN 2044-124X
Oloke, D A; Edwards, D J and Thorpe, T A (2003) Predicting construction plant breakdown time using time series modelling. Journal of Engineering, Design and Technology, 1(2), pp. 202-221. ISSN 1726-0531
Olowoake, M A O (2015) A theoretical framework to support facilities maintenance management of higher education institutions buildings in Nigeria. PhD thesis, University of Salford, UK.
Olugboyega, O; Ilesanmi, K E; Oseghale, G E and Aigbavboa, C (2024) The link between construction apps’ acceptance and digital attributes of construction professionals: Perspectives from digital competence model. Construction Innovation, 24(4), pp. 912-932. ISSN 1471-4175
Oluseye, R; Odeyinka, H and Leo-Olagbaye, F (2024) The effect of leadership style on the survival of quantity surveying firms. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Omar Attallah, S; Senouci, A; Kandil, A and al-Derham, H (2013) Utilization of life-cycle analysis to evaluate sustainability rating systems for construction projects with a case study on qatar sustainability assessment system (qsas). Smart and Sustainable Built Environment, 2(3), pp. 272-287. ISSN 2046-6099
Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Oraee, M.; Hosseini, M. R. and Edwards, D. J. (2026) Quantitative insights into collaboration in BIM-enabled projects: A PLS-SEM approach. Engineering, Construction and Architectural Management, 33(3), pp. 2538-2563. ISSN 0969-9988
Ordonez Arizaga, J F (2007) A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment. PhD thesis, University of Maryland, College Park, USA.
Ortega Quintana, S A (2024) Relationship between project manager’s emotional intelligence and their performance: A quantitative correlational study. DBA thesis, University of Phoenix, USA.
Ortlepp, R; Gruhler, K and Schiller, G (2016) Material stocks in Germany's non-domestic buildings: A new quantification method. Building Research & Information, 44(8), pp. 840-862. ISSN 0961-3218
Osei-Kyei, R. and Chan, A. P. C. (2019) Model for predicting the success of public–private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007
Osei-Kyei, R and Chan, A P C (2019) Model for predicting the success of public-private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007
Osei-Kyei, R; Narbaev, T; Atafo-Adabre, M; Chileshe, N and Ofori-Kuragu, J K (2023) Critical success criteria for retirement village public: private partnership housing. Construction Innovation, 23(5), pp. 1018-1037. ISSN 1471-4175
Ospina-Alvarado, A; Castro-Lacouture, D and Roberts, J S (2016) Unified framework for construction project integration. Journal of Construction Engineering and Management, 142(7): 4016019, ISSN 0733-9364
Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure. PhD thesis, University of California, Davis, USA.
Osuolale, M. D. and Felkner, J. (2026) From awareness to adoption: A theoretically grounded analysis of professional pathways in sustainable construction material usage in Nigeria. Journal of Engineering, Design and Technology, 24(4), pp. 963-991. ISSN 1726-0531
Owolabi, H; Oyedele, L; Alaka, H; Ajayi, S; Bilal, M and Akinade, O (2020) Risk mitigation in PFI/PPP project finance: A framework model for financiers' bankability criteria. Built Environment Project and Asset Management, 10(1), pp. 28-49. ISSN 2044-124X
Oyedele, J B; McGreal, S; Adair, A and Ogedengbe, P (2013) Performance and role of European listed infrastructure in a mixed-asset portfolio. Journal of Financial Management of Property and Construction, 18(2), pp. 160-183. ISSN 1366-4387
Oyewole, M O; Komolafe, M O and Gbadegesin, J T (2023) Understanding stakeholders' opinion and willingness on the adoption of sustainable residential property features in a developing property market. International Journal of Construction Management, 23(2), pp. 358-370. ISSN 1562-3599
Oyeyipo, O; Adeyemi, B; Osuizugbo, I and Ojelabi, R (2022) Service quality of building services consultants in building project delivery; clients' perspectives. International Journal of Construction Management, 22(15), pp. 2886-2894. ISSN 1562-3599
Pacheco-Torres, R; Etxebarria-Berrizbeitia, S and Gago, E J (2024) Influence of urban density on energy retrofit of building stock: Case study of Spain. Architectural Engineering and Design Management, 20(6), pp. 1832-1855. ISSN 1745-2007
Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Palaniappan, S (2009) Environmental performance of on-site construction processes in post-tensioned slab foundation construction: A study of production home building in the Greater Phoenix area. PhD thesis, Arizona State University, USA.
Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. PhD thesis, Loughborough University, UK.
Papageorgiou, G and Demetriou, G (2020) Investigating learning and diffusion strategies for sustainable mobility. Smart and Sustainable Built Environment, 9(1), pp. 1-16. ISSN 2046-6099
Pasquire, C; Ballard, G; Bildsten, L; Björnfot, A and Sandberg, E (2011) Value-driven purchasing of kitchen cabinets in industrialised housing. Journal of Financial Management of Property and Construction, 16(1), pp. 73-83. ISSN 1366-4387
Paz, Diogo Henrique Fernandes da (2019) Development of a system to support integrated management of construction and demolition waste. PhD thesis, Universidade Federal de Pernambuco, Brazil.
Pearson, A D (2014) An investigation of climatically responsive ultra-low energy housing in rural Scotland: a case study. PhD thesis, University of Dundee, UK.
Pecquet, C F (2013) Measuring safety climate as an indicator of effective safety and health programs in the construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Pellegrino, R; Costantino, N; Pietroforte, R and Sancilio, S (2012) Construction of multi-storey concrete structures in Italy: Patterns of productivity and learning curves. Construction Management and Economics, 30(2), pp. 103-115. ISSN 1466433X
Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of last planner system®: A case study. Engineering, Construction and Architectural Management, 25(9), pp. 1110-1126. ISSN 0969-9988
Pheng, L S and Tan, S K L (1998) How 'just-in-time' wastages can be quantified: Case study of a private condominium project. Construction Management and Economics, 16(6), pp. 621-635. ISSN 01446193
Pinion Jr., C (2013) The impact of job control on employee perception of management commitment to safety in an engineering, procurement and construction company. DPh thesis, University of Texas School of Public Health, USA.
Pirzadeh, P; Zhang, R P and Lingard, H (2016) Safety climate as a multi-level and dynamic concept: Exploring the variance at different levels over time. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Pittri, H; Agyekum, K; Salgin, B; Dompey, A M A; Gasue, R and Anderson, S A (2025) The fourth industrial revolution technologies and the construction industry in Ghana. Construction Economics and Building, 25(3-4), pp. 231-253. ISSN 2204-9029
Pittri, H; Agyekum, K; Ayebeng Botchway, E; Opoku, A and Bimpli, I (2024) Design for deconstruction (dfd) implementation among design professionals: Empirical evidence from Ghana. International Journal of Construction Management, 24(13), pp. 1387-1397. ISSN 1562-3599
Plessis, C D (2007) A strategic framework for sustainable construction in developing countries. Construction Management and Economics, 25(1), pp. 67-76. ISSN 1466433X
Plugge, P W (2007) An evidence-based comparison of construction project delivery. PhD thesis, Colorado State University, USA.
Ponton, H; Osborne, A; Greenwood, D and Thompson, N (2019) Exploring the designer-constructor teamwork interface to improve collaboration: A review of current literature. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Poon, J (2004) An investigation of the differences in ethical perceptions among construction managers and their peers. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Poon, J (2004) The study of ethical perceptions of construction managers. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Potseluyko Amobi, L (2021) Improving business and technical operations within timber frame self-build housing sector by applying integrated VR/AR and BIM technologies. PhD thesis, Teesside University, UK.
Prachi Vinod, I; Gangadhar, M and Deepak, M D (2021) Identifying the performance areas affecting the project performance for Indian construction projects. Journal of Engineering, Design and Technology, 19(1), pp. 1-20. ISSN 1726-0531
Prakash, A and Phadtare, M (2018) Service quality for architects: Scale development and validation. Engineering, Construction and Architectural Management, 25(5), pp. 670-686. ISSN 0969-9988
Prasad K V; Vasugi V; Venkatesan R and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(1), pp. 58-78. ISSN 1366-4387
Pratomo, R A; Islamiah, Z and Bhaskara, B E (2024) A pathway to urban resilience: Investigating green open space priority areas to mitigate the urban heat island phenomenon in Samarinda City, Indonesia. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 591-616. ISSN 1759-5916
Prayoonhong, C (1995) An integrated information model for the building process. DArch thesis, University of Michigan, USA.
Preece, C and Tarawneh, S (1997) Service quality for client satisfaction on design & build projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Prince, M W (1988) Strategic planning in construction firms: Perceptions and personal characteristics of the manager, strategic planning behaviour, and subjective performance in a large scale survey of the canadian construction industry. PhD thesis, University of Bradford, UK.
Prochorskaite, A (2016) An investigation of the 'soft' features of sustainable and healthy housing design: exploring stakeholder preferences and their provision in new housing developments. PhD thesis, Liverpool John Moores University, UK.
Proverbs, D G (1998) A best practice for high-rise insitu concrete construction based on French, German and UK contractor performance measures. PhD thesis, University of Wolverhampton, UK.
Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(2), pp. 174-181. ISSN 0969-9988
Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(4), pp. 350-358. ISSN 0969-9988
Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193
Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) European construction contractors: A productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(2), pp. 221-230. ISSN 01446193
Prozzi, J A (2001) Modeling pavement performance by combining field and experimental data. PhD thesis, University of California, Berkeley, USA.
Pryke, S; Lunic, D and Badi, S (2015) The effect of leader emotional intelligence on leader–follower chemistry: A study of construction project managers. Construction Management and Economics, 33(8), pp. 603-624. ISSN 01446193
Pryke, S and Pearson, S (2006) Project governance: Case studies on financial incentives. Building Research & Information, 34(6), pp. 534-545. ISSN 0961-3218
Pryke, Stephen David (2002) UK construction in transition: developing a social network approach to the evaluation of new procurement and management strategies. PhD thesis, University College London, UK.
Qabaja, M and Tenekeci, G (2023) Nexus between construction sector and economic indicators for Turkey and European Union evidenced by panel data analysis. Engineering, Construction and Architectural Management, 30(5), pp. 1978-2007. ISSN 0969-9988
Qi, K. and Lu, M. (2026) A data-driven framework for quantifying physical workload in construction using posture-hour metrics. Journal of Construction Engineering and Management, 152(7): 04026100, ISSN 0733-9364
Rad, H N and Khosrowshahi, F (1998) Quality measurement in construction projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Radosavljević M, M W (2002) The evidence of complex variability in construction labour productivity. Construction Management and Economics, 20(1), pp. 3-12. ISSN 01446193
Raj, S; Hillig, J B and Hughes, W P (2009) Responsiveness to change by standard-form contract drafters in the construction industry: A case study of the FIDIC white book. International Journal of Law in the Built Environment, 1(3), pp. 205-220. ISSN 1756-1450
Rajala, P; Ylä-Kujala, A; Sinkkonen, T and Kärri, T (2022) Profitability in construction: How does building renovation business fare compared to new building business. Construction Management and Economics, 40(3), pp. 223-237. ISSN 01446193
Ramanathan, C; Narayanan, S P and Idrus, A B (2012) Construction delays causing risks on time and cost: a critical review. Construction Economics and Building, 12(1), pp. 37-57. ISSN 2204-9029
Rana Abdollahi, R; Bagherzadeh, F; Schnabel, M A and Bakshi, N (2024) A design methodology to consider occupants' spatial adjustment and manage view content in adaptive façade design for improving visual comfort. Architectural Engineering and Design Management, 20(1), pp. 168-190. ISSN 1745-2007
Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.
Ranasinghe, M (1994) Quantification and management of uncertainty in activity duration networks. Construction Management and Economics, 12(1), pp. 15-29. ISSN 01446193
Ranasinghe, M (1994) Contingency allocation and management for building projects. Construction Management and Economics, 12(3), pp. 233-243. ISSN 01446193
Ranasinghe, M and Russell, A D (1992) Analytical approach for economic risk quantification of large engineering projects : Validation. Construction Management and Economics, 10(1), pp. 45-68. ISSN 01446193
Randolph Thomas, H and Napolitan, C L (1995) Quantitative effects of construction changes on labor productivity. Journal of Construction Engineering and Management, 121(3), pp. 290-296. ISSN 0733-9364
Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Rempelos, G (2023) A whole life carbon model for railway track system interventions. PhD thesis, University of Southampton, UK.
Ren, Z; Anumba, C J and Ugwu, O (2000) Towards a multi-agent system for construction claims negotiation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Ren, Z; Anumba, G J and Ugwu, O O (2001) Construction claims management: Towards an agent-based approach. Engineering, Construction and Architectural Management, 8(3), pp. 185-197. ISSN 0969-9988
Reza Hosseini, M; Chileshe, N and Zillante, G (2014) Investigating the factors associated with job satisfaction of construction workers in South Australia. Construction Economics and Building, 14(3), pp. 1-17. ISSN 2204-9029
Ribeiro, D B; Coutinho, A R; Satyro, W C; Campos, F C; Lima, C R C; Contador, J C and Gonçalves, R F (2024) The DAWN readiness model to assess the level of use of Industry 4.0 technologies in the construction industry in Brazil. Construction Innovation, 24(2), pp. 515-536. ISSN 1471-4175
Rilett, L R (1998) Effect of variability on end product specifications. Journal of Construction Engineering and Management, 124(2), pp. 139-145. ISSN 0733-9364
Rilett, L R (1998) Identifying component variability of end product specification tests. Journal of Construction Engineering and Management, 124(2), pp. 133-138. ISSN 0733-9364
Roberts, C; Edwards, D J; Sing, M C P and Aigbavboa, C (2023) Post-occupancy evaluation: Process delineation and implementation trends in the UK higher education sector. Architectural Engineering and Design Management, 19(2), pp. 125-147. ISSN 1745-2007
Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(2), pp. 181-197. ISSN 1466433X
Rodionova, A (2022) Robust and reliable building renovation strategies for environmental and economic performance. DSc thesis, ETH Zürich, Switzerland.
Rodriguez, C M; Medina, J M and Pinzón, A (2019) Thermal comfort and satisfaction in the context of social housing: Case study in Bogotá, Colombia. Journal of Construction in Developing Countries, 24(1), pp. 101-124. ISSN 1823-6499
Rohman, Mohammad Arif (2017) Stakeholders' perspective on achieving project social benefit from Indonesian toll roads. PhD thesis, University of Melbourne, Australia.
Rooke, J D (1997) Developing a more empirical approach to culture, attitude and motivation in construction management research: a critique and a proposal. Journal of Construction Procurement, 3(2), pp. 45-55. ISSN 1358-9180
Ross, N; Bowen, P A and Lincoln, D (2010) Sustainable housing for low-income communities: Lessons for South Africa in local and other developing world cases. Construction Management and Economics, 28(5), pp. 433-449. ISSN 1466433X
Rotimi, F E (2013) An evaluative framework for defects in new residential buildings: The New Zealand case. PhD thesis, Auckland University of Technology, New Zealand.
Rotimi, F E; Burfoot, M; Naismith, N; Mohaghegh, M and Brauner, M (2023) A systematic review of the mental health of women in construction: Future research directions. Building Research & Information, 51(4), pp. 459-480. ISSN 0961-3218
Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(4), pp. 357-370. ISSN 01446193
Russell, A D and Ranasinghe, M (1992) Analytical approach for economic risk quantification of large engineering projects. Construction Management and Economics, 10(4), pp. 277-301. ISSN 01446193
Russell, J S (1988) A knowledge-based system approach to the contractor prequalification process. PhD thesis, Purdue University, USA.
Sachs, T; Tiong, R and Wagner, D (2007) Political risk quantification using fuzzy set approach. Journal of Financial Management of Property and Construction, 12(2), pp. 107-126. ISSN 1366-4387
Sai Bharadwaj, B and Chennupati, S K (2023) Pli cancellation in ecg signal using intrinsic time scale decomposition with adaptive gain control. Journal of Engineering, Design and Technology, 21(6), pp. 1725-1745. ISSN 1726-0531
Said, H. and Cao, J. (2026) Optimizing building prefabrication strategies by balancing modularity and complicatedness. Journal of Construction Engineering and Management, 152(7): 04026097, ISSN 0733-9364
Saini, M (2015) A framework for transferring and sharing tacit knowledge in construction supply chains within lean and agile processes. PhD thesis, University of Salford, UK.
Saka, N (2013) The impact of foreign direct investment on the construction sectors of Africa. PhD thesis, Glasgow Caledonian University, UK.
Saka, N and Olanipekun, A O (2021) Impact of the banking sector reform in the construction sector. Journal of Financial Management of Property and Construction, 26(3), pp. 387-407. ISSN 1366-4387
Saka, N; Saka, A B; Akinradewo, O and Aigbavboa, C O (2024) Impact assessment of political administrations on the performance of the construction sector: A time series analysis. Journal of Engineering, Design and Technology, 22(1), pp. 1-21. ISSN 1726-0531
Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.
Salam, Md Abdus (2007) Time and cost overruns on high-rise building construction in Bangladesh. PhD thesis, Abertay University, UK.
Salary, S and Reyes, M (2025) Identifying the impact of preconstruction elements on project budget. Journal of Construction Engineering and Management, 151(6): 04025058, ISSN 0733-9364
Salleh, Rohaniyati (2009) Critical success factors of project management for Brunei construction projects: Improving project performance. PhD thesis, Queensland University of Technology, Australia.
Salmaninezhad, M and Jazayeri Moghaddas, S M (2023) A multi-attribute approach to select the best method for repairing river bridge columns. Engineering, Construction and Architectural Management, 30(1), pp. 1-18. ISSN 0969-9988
Sami Kashkooli, A M (2013) A critical building lifecycle assessment framework for building designers and decision makers. PhD thesis, University of Sheffield, UK.
Sandy, G C (1981) An evaluative comparison of the satisfaction with the utility of new buildings versus library additions and addition/renovations. PhD thesis, Florida State University, USA.
Sang, K J C; Dainty, A R J and Ison, S G (2004) The impact of the structure and culture of the construction industry on employee well-being: Directions for future research. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Santamaria Carrera, J L (2017) Quantifying the effect of construction site factors on concrete quality, costs and production rates. PhD thesis, University of New Mexico, USA.
Saratsis, E; Dogan, T and Reinhart, C F (2017) Simulation-based daylighting analysis procedure for developing urban zoning rules. Building Research & Information, 45(5), pp. 478-491. ISSN 0961-3218
Sarie Eldin, H S (1995) Consortia agreements in the international construction industry: With special reference to Egypt. PhD thesis, Queen Mary University of London, UK.
Schatteman, D; Herroelen, W; Van De Vonder, S and Boone, A (2008) Methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134(11), pp. 885-893. ISSN 0733-9364
Schneider, K (2023) Three essays on investment-based asset pricing. PhD thesis, University of Manchester, UK.
Schwatka, N V (2014) Managing through measurement: Occupational health and safety in the construction industry. PhD thesis, Colorado State University, USA.
Scott, S and Harris, R A (2004) United Kingdom construction claims: Views of professionals. Journal of Construction Engineering and Management, 130(5), pp. 734-741. ISSN 0733-9364
Seddiki, M; Bennadji, A and Tehami, M (2020) Barriers to the adoption of energy efficiency measures in Mostaganem, Algeria. Journal of Construction in Developing Countries, 25(2), pp. 39-61. ISSN 1823-6499
Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988
Selĺs, M E S; Rubio, J A C and Mullor, J R (2008) Development of a quantification proposal for hidden quality costs: Applied to the construction sector. Journal of Construction Engineering and Management, 134(10), pp. 749-757. ISSN 0733-9364
Senaratne, S and Udawatta, N (2013) Managing intragroup conflicts in construction project teams: Case studies in Sri Lanka. Architectural Engineering and Design Management, 9(3), pp. 158-175. ISSN 1745-2007
Senouci, A; Alsarraj, A; Gunduz, M and Eldin, N (2017) Analysis of change orders in Qatari construction projects. International Journal of Construction Management, 17(4), pp. 280-292. ISSN 1562-3599
Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.
Serag, E; Oloufa, A; Malone, L and Radwan, E (2010) Model for quantifying the impact of change orders on project cost for U.S. roadwork construction. Journal of Construction Engineering and Management, 136(9), pp. 1015-1027. ISSN 0733-9364
Seymour, D and Low, S P (1990) The quality debate. Construction Management and Economics, 8(1), pp. 13-29. ISSN 01446193
Sezer, A A (2016) Construction performance measurement: Site managers in refurbishment projects. PhD thesis, Chalmers University of Technology, Sweden.
Shahid, M. U.; Thaheem, M. J. and Arshad, H. (2023) Quantification and benchmarking of construction waste and its impact on cost: A case of Pakistan. Engineering, Construction and Architectural Management, 30(6), pp. 2304-2333. ISSN 0969-9988
Shahid, M U; Thaheem, M J and Arshad, H (2023) Quantification and benchmarking of construction waste and its impact on cost: a case of Pakistan. Engineering, Construction and Architectural Management, 30(6), pp. 2304-2333. ISSN 0969-9988
Shahzad, W M; Reddy, S M; Kahandawa, R and Rotimi, J O B (2024) Benefits, constraints and enablers of modular offsite construction (MOSC) in New Zealand high-rise buildings. Engineering, Construction and Architectural Management, 31(10), pp. 4042-4061. ISSN 0969-9988
Shanmugapriya, S (2016) Structural equation modelling to investigate the factors influencing quality safety and productivity in construction projects. PhD thesis, Anna University, Chennai, India.
Sharar, M; Agyekum, K; Manu, P; Che Ibrahim, C K I; Mahamadu, A M; Antwi-Afari, M F and Danso, F O (2024) Design for safety in construction: A study of design professionals in Kuwait. International Journal of Building Pathology and Adaptation, 42(4), pp. 596-617. ISSN 23984708
Sharma, V (2010) Asset levels of service-based decision support system for municipal infrastructure investment. PhD thesis, University of Alberta, Canada.
Shayboun, M; Kifokeris, D and Koch, C (2019) Construction planning with machine learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Shebob, A; Dawood, N; Shah, R K and Xu, Q (2012) Comparative study of delay factors in Libyan and the UK construction industry. Engineering, Construction and Architectural Management, 19(6), pp. 688-712. ISSN 0969-9988
Sherratt, F; Farrell, P and Noble, R (2012) Inconsistent, incomplete and incidental: Site safety culture from a constructionist perspective. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Shiha, A and Dorra, E M (2023) Resilience index framework for the construction industry in developing countries. Journal of Construction Engineering and Management, 149(4): 04023008, ISSN 0733-9364
Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364
Shiha, A and El-Adaway, I H (2025) Localized multivariate statistical assessment of United States construction labor shortages. Journal of Construction Engineering and Management, 151(8): 04025097, ISSN 0733-9364
Shiha, A; Elazhary, M and El-Adaway, I H (2025) Price adjustment clauses: Enhanced price volatility forecasting for construction materials. Journal of Construction Engineering and Management, 151(9): 04025121, ISSN 0733-9364
Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.
Shohet, I M (2003) Building evaluation methodology for setting maintenance priorities in hospital buildings. Construction Management and Economics, 21(7), pp. 681-692. ISSN 01446193
Shokri-Ghasabeh, M and Chileshe, N (2016) Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation, 16(2), pp. 127-157. ISSN 1471-4175
Shrestha, K K (2016) Causes of change orders and its impact on road maintenance contracts. PhD thesis, University of Nevada, Las Vegas, USA.
Siddiquei, Ahmad (2019) An extended model of temporal leadership, team processes, and project team performance. PhD thesis, Bond University, Australia.
Siew, R Y J; Balatbat, M C A and Carmichael, D G (2013) The relationship between sustainability practices and financial performance of construction companies. Smart and Sustainable Built Environment, 2(1), pp. 6-27. ISSN 2046-6099
Siew, Yung (2014) Evaluating and enhancing the impact of sustainability reporting tools (SRTs). PhD thesis, University of New South Wales, Australia.
Silverio, A K; Suresh, S; Renukappa, S and Heesom, D (2023) Status of BIM implementation in the Dominican Republic construction industry: an empirical study. Journal of Engineering, Design and Technology, 21(2), pp. 417-441. ISSN 1726-0531
Simpson, J and Uttley, J (2025) Designing for pro-environmental behaviour change: The aspiration-reality gap. Buildings & Cities, 6(1), pp. 1117-1134. ISSN 2632-6655
Singh, A (1990) Development of process and mix flexibility in construction. PhD thesis, Purdue University, USA.
Singla, H K (2020) Does family ownership affect the profitability of construction and real estate firms? Evidence from India. Journal of Financial Management of Property and Construction, 25(1), pp. 107-124. ISSN 1366-4387
Sinoh, S S; Othman, F and Ibrahim, Z (2020) Critical success factors for BIM implementation: A Malaysian case study. Engineering, Construction and Architectural Management, 27(9), pp. 2737-2765. ISSN 0969-9988
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364
Skibniewski, M J and Chao, L C (1992) Evaluation of advanced construction technology with AHP method. Journal of Construction Engineering and Management, 118(3), pp. 577-593. ISSN 0733-9364
Skitmore, M and Ng, S T (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460. ISSN 0733-9364
Skitmore, M and Runeson, G (2006) Bidding models: Testing the stationarity assumption. Construction Management and Economics, 24(8), pp. 791-803. ISSN 1466433X
Smailes, R L (2000) Building chan chan: The application of construction project management to the analysis of ancient architecture. PhD thesis, University of Florida, USA.
Small, E P (1999) Development of a methodology for the integration of seismic risk mitigation activities in project and network level bridge management systems. PhD thesis, State University of New York at Buffalo, USA.
Smallwood, J J and Haupt, T C (2009) Construction ergonomics: Perspectives of female and male production workers. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Smith, C; Drinkwater, A; Modlich, M; Horst, D V D and Doherty, R (2024) IAQ and environmental health literacy: Lived experiences of vulnerable people. Buildings & Cities, 5(1), pp. 231-246. ISSN 2632-6655
Smith, J; Mills, A and Iyer-Raniga, U (2004) Benchmarking the implementation of continuing professional development in the victorian construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Smith, J P (2013) Trust-building in the construction project delivery process: A relational lookahead tool for managing trust. PhD thesis, Texas A&M University, USA.
Smyth, H (2016) The business development manager as a value creation worker. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Sodeinde, G M (2021) Effect of entrepreneurial innovation on the performance of informal sector: A study of carpentry firms in Lagos State. PhD thesis, Kwara State University, Nigeria.
Soliman, M (2015) Life-cycle management of civil and marine structures under fatigue and corrosion effects. PhD thesis, Lehigh University, USA.
Soman, R K and Whyte, J K (2020) Codification challenges for data science in construction. Journal of Construction Engineering and Management, 146(7): 04020072, ISSN 0733-9364
Somboonpisan, J and Limsawasd, C (2021) Environmental weight for bid evaluation to promote sustainability in highway construction projects. Journal of Construction Engineering and Management, 147(4): 04021013, ISSN 0733-9364
Sommovigo, V; Setti, I; Maiolo, M E and Argentero, P (2021) Tunnel construction workers' well-being: The role of job control and supervisor support. International Journal of Construction Management, 21(9), pp. 945-957. ISSN 1562-3599
Sompolgrunk, A; Banihashemi, S; Hosseini, M R; Golzad, H and Hajirasouli, A (2023) An integrated model of BIM return on investment for Australian small- and medium-sized enterprises (SMEs). Engineering, Construction and Architectural Management, 30(5), pp. 2048-2074. ISSN 0969-9988
Sompolgrunk, A; Banihashemi, S and Mohandes, S R (2023) Building information modelling (BIM) and the return on investment: A systematic analysis. Construction Innovation, 23(1), pp. 129-154. ISSN 1471-4175
Son, J; Jeong, J; Jeong, J; Kumi, L and Mun, H (2026) Data-driven approach to analyzing factors influencing construction accident severity using shap analysis. Journal of Construction Engineering and Management, 152(3): 04025282, ISSN 0733-9364
South, A J (2019) Stakeholder network dynamics and the governance of public-private partnerships. PhD thesis, Stanford University, USA.
Spearing, L A; Bakchan, A; Hamlet, L C; Stephens, K K; Kaminsky, J A and Faust, K M (2022) Comparing qualitative analysis techniques for construction engineering and management research: The case of arctic water infrastructure. Journal of Construction Engineering and Management, 148(7): 04022058, ISSN 0733-9364
Srivastava, M (2020) Cooperative learning in design studios: A pedagogy for net-positive performance. Buildings & Cities, 1(1), pp. 594-609. ISSN 2632-6655
Sruthilaya, D; Vilventhan, A and Gopal, P R C (2025) Development of a project complexity measurement model for metro rail projects. Engineering, Construction and Architectural Management, 32(4), pp. 2728-2744. ISSN 0969-9988
Ssegawa-Kaggwa, J; Ngowi, A B and Ntshwene, K (2013) Using a situation analysis to identify the construction industry deficiencies in Botswana. Journal of Construction in Developing Countries, 18(1), pp. 1-18. ISSN 1823-6499
Stanic, N (2016) Assessment methods for structural and hydraulic properties of concrete sewer pipes. PhD thesis, Delft University of Technology, Netherlands.
Stevens, F J (2016) A comparative analysis of the percentage completion project methodology and the stevens earned value instrument. DBA thesis, Wilmington University (Delaware), USA.
Stevens, M S (2012) Impact of key management practices on overhead to direct cost ratio for specialty construction contractors. PhD thesis, University of Florida, USA.
Stone, A; Shipworth, D; Biddulph, P and Oreszczyn, T (2014) Key factors determining the energy rating of existing English houses. Building Research & Information, 42(6), pp. 725-738. ISSN 0961-3218
Sturk, R (1998) Engineering geological information: Its value and impact on tunnelling. DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.
Subprasom, K (2004) Multi-party and multi-objective network design analysis for the build-operate-transfer scheme. PhD thesis, Utah State University, USA.
Subramaniyan, A S (2020) Engineering procurement and construction companies in India: Which factors drive their willingness to pay. PhD thesis, Chitkara University, Punjab, India.
Sulaiman, N F (2002) The development of a dual phase approach to embracing a total quality culture in the Malaysian construction industry. PhD thesis, Glasgow Caledonian University, UK.
Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Sun, X (2016) Proposed improvements to the MCAA method for quantifying construction loss of productivity. PhD thesis, University of California, Berkeley, USA.
Sunusi, B; Hashim, A H; Samah, A A and Ahmad, N (2021) The moderating effect of privacy in the relationships between residential livability and residents' life satisfaction. Journal of Construction in Developing Countries, 26(1), pp. 45-62. ISSN 1823-6499
Swan, W C (2002) Construct IT: An exploratory case study of a knowledge network supported by an intermediary. PhD thesis, University of Salford, UK.
Sweis, G J; Hiyassat, M and Al-Hroub, F F (2016) Assessing lean conformance by first-grade contractors in the Jordanian construction industry. Construction Innovation, 16(4), pp. 446-459. ISSN 1471-4175
Swider, S C (2008) Behind great walls: Modes of employment among migrant construction workers in China's informal labor market. PhD thesis, University of Wisconsin - Madison, USA.
Sylvester, K E (1999) An analysis of the benefits of photovoltaic-coated glazing on owning and operating costs of high rise commercial buildings. PhD thesis, Texas A&M University, USA.
Tah, J H M and Carr, V (2000) A proposal for construction project risk assessment using fuzzy logic. Construction Management and Economics, 18(4), pp. 491-500. ISSN 01446193
Tah, J H M; Thorpe, A and McCaffer, R (1994) A survey of indirect cost estimating in practice. Construction Management and Economics, 12(1), pp. 31-36. ISSN 01446193
Takim, R (2005) A framework for successful construction project performance. PhD thesis, Glasgow Caledonian University, UK.
Takim, R; Akintoye, A and Kelly, J (2004) Analysis of measures of construction project success in Malaysia. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Talhouni, B T K (1990) Measurement and analysis of construction labour productivity. PhD thesis, University of Dundee, UK.
Tam, C M (1992) Discriminant analysis model for predicting contractor performance in Hong Kong. PhD thesis, Loughborough University, UK.
Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation. PhD thesis, Oklahoma State University, USA.
Tan, Y; Deng, T; Zhou, J and Zhou, Z (2024) Lidar-based automatic pavement distress detection and management using deep learning and BIM. Journal of Construction Engineering and Management, 150(7): 04024069, ISSN 0733-9364
Tang, B Q; Han, J; Guo, G F; Chen, Y and Zhang, S (2019) Building material prices forecasting based on least square support vector machine and improved particle swarm optimization. Architectural Engineering and Design Management, 15(3), pp. 196-212. ISSN 1745-2007
Tangwe, S and Simon, M (2019) Quantification of the viability of residential air source heat pump water heaters as potential replacement for geysers in South Africa. Journal of Engineering, Design and Technology, 17(2), pp. 456-470. ISSN 1726-0531
Tatum, C B (1983) Decision-making in structuring construction project organizations. PhD thesis, Stanford University, USA.
Taylor, M S (2021) Strategic management accounting practices in medium sized UK construction companies: a mixed-methods approach. PhD thesis, Nottingham Trent University, UK.
Teferra, K (2012) Developments in the theory and applications of the variability response function concept. PhD thesis, Columbia University, USA.
Teo, M M M; Loosemore, M; Marosszeky, M; Karim, K and Gardner, D (2000) Operatives' attitudes towards waste on construction project. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems. PhD thesis, Aston University, UK.
Thi Binh, A D; Asif, M S; Fan, Y; Thi Cam, H L and Quang, H T (2026) The domino effect of risks on supply chain performance in disruptive times. International Journal of Construction Management, 26(4), pp. 583-603. ISSN 1562-3599
Thomson, C S (2006) A study of the innovation process within the construction project environment. PhD thesis, University of Dundee, UK.
Thomson, C S and Munns, A K (2004) Successfully implementing system innovations within the construction project environment. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Tibon, N R and Suiza, R M (2018) Quantification of seismic exposure and vulnerability of historic buildings in Metro Manila. International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 249-257. ISSN 1759-5916
Tilde, A (2023) An investigation of energy saving behaviour for residential buildings in Nigeria. PhD thesis, University of Salford, UK.
Tinarwo, B; Rahimian, F and Abi Ghanem, D (2025) Towards a trajectory for sustainable policies and market strategies governing building lifecycle energy performance. Smart and Sustainable Built Environment, 14(1), pp. 140-162. ISSN 2046-6099
Tombesi, P (2008) Out of what? Locating the underpinnings of theory. Building Research & Information, 36(6), pp. 668-673. ISSN 0961-3218
Torbica, Z M (1997) Total quality management and customer satisfaction in homebuilding. PhD thesis, University of Florida, USA.
Touran, A and Wiser, E P (1992) Monte Carlo technique with correlated random variables. Journal of Construction Engineering and Management, 118(2), pp. 258-272. ISSN 0733-9364
Toyin, J O and Mewomo, M C (2023) An investigation of barriers to the application of building information modelling in Nigeria. Journal of Engineering, Design and Technology, 21(2), pp. 442-468. ISSN 1726-0531
Triana-Granados, K V; Bernard, I R; Merlin, A; Lucko, G and Ballesteros-Pérez, P (2024) Graphical delay tracking for linear and repetitive schedules. Journal of Construction Engineering and Management, 150(8): 04024090, ISSN 0733-9364
Tsai, H; Wang, L and Lin, L (2007) A study on improving the ranking procedure for determining the most advantageous tender. Construction Management and Economics, 25(5), pp. 545-554. ISSN 1466433X
Tsai, H; Wang, L C and Lee, J W (2006) Exploration of ranking method of group decision making. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Tsang, W-C (2021) Safety violations of the construction workers in Hong Kong: quantitative and qualitative analysis of the dynamics. PhD thesis, University of Hong Kong, Hong Kong.
Tsehayae, A A and Fayek, A R (2016) System model for analysing construction labour productivity. Construction Innovation, 16(2), pp. 203-228. ISSN 1471-4175
Tsenkova, S (1998) Private housebuilding and housing markets in transitional economies: The case of Bulgaria. PhD thesis, University of Toronto, Canada.
Tucker, J R; Pearce, A R; Bruce, R D; McCoy, A P and Mills, T H (2012) The perceived value of green professional credentials to credential holders in the US building design and construction community. Construction Management and Economics, 30(11), pp. 963-979. ISSN 1466433X
Turner, M; Scott-Young, C M and Holdsworth, S (2017) Promoting wellbeing at university: The role of resilience for students of the built environment. Construction Management and Economics, 35(11-12), pp. 707-718. ISSN 01446193
Tutesigensi, A and Parcell, K (2007) Benefits of mobile telephones for construction contractors in the United Kingdom. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Tuuli, M and Acquah, S (2012) Do you feel what i feel? Empowerment contagion in project teams. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Uddin, M M (2011) Robust statistical methods for non-normal quality assurance data analysis in transportation projects. PhD thesis, University of Kentucky, USA.
Umeokafor, N; Windapo, A O; Manu, P; Diugwu, I and Haroglu, H (2023) Critical barriers to prevention through design in construction in developing countries: A qualitative inquiry. Engineering, Construction and Architectural Management, 30(7), pp. 3014-3042. ISSN 0969-9988
Umer, W; Li, H; Szeto, G P Y and Wong, A Y L (2017) Identification of biomechanical risk factors for the development of lower-back disorders during manual rebar tying. Journal of Construction Engineering and Management, 143(1): 04016080, ISSN 0733-9364
Usman, A M and Abdullah, K (2024) Development of comprehensive energy usage impact and carbon footprint parameters for green building life cycle assessment. Journal of Engineering, Design and Technology, 22(4), pp. 1057-1081. ISSN 1726-0531
Uwakweh, B O and Maloney, W F (1991) Conceptual model for manpower planning for the construction industry in developing countries. Construction Management and Economics, 9(5), pp. 451-465. ISSN 01446193
Vibhakar, N N; Tripathi, K K; Johari, S and Jha, K N (2023) Identification of significant financial performance indicators for the Indian construction companies. International Journal of Construction Management, 23(1), pp. 13-23. ISSN 1562-3599
Victar, H C; Perera, B A K S; Palihakkara, A D and Dewagod, K G (2024) Roles and competencies of quantity surveyors in achieving a circular built environment: An investigation according to 3r principles. Smart and Sustainable Built Environment, 13(4), pp. 1015-1040. ISSN 2046-6099
Vieira, Luiz de Brito Prado (2020) Analysis of technologies for recycling the waste generated in concrete production in ready mixed concrete plants. PhD thesis, Universidade de São Paulo, Brazil.
Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988
Vinodh, S; Selvaraj, T; Chintha, S K and K. E. K., V (2015) Development of value stream map for an Indian automotive components manufacturing organization. Journal of Engineering, Design and Technology, 13(3), pp. 380-399.
Vinodh, S; Sundararaj, G; Devadasan, S R and Rajanayagam, D (2008) Quantification of agility: An experimentation in an Indian electronics switches manufacturing company. Journal of Engineering, Design and Technology, 6(1), pp. 48-64. ISSN 1726-0531
Vitiello, Umberto (2017) A sustainable framework for the optimization of retrofit strategies of existing buildings. PhD thesis, Università degli Studi di Napoli Federico II, Italy.
Vorster, M C and De la Garza, J M (1990) Consequential equipment costs associated with lack of availability and downtime. Journal of Construction Engineering and Management, 116(4), pp. 656-669. ISSN 0733-9364
Wakchaure, S S and Jha, K N (2012) Determination of bridge health index using analytical hierarchy process. Construction Management and Economics, 30(2), pp. 133-149. ISSN 1466433X
Walker, D H T (1994) An investigation into factors that determine building construction time performance. PhD thesis, Royal Melbourne Institute of Technology, Australia.
Walsh, A J (2021) Cultural dissonance as a risk factor in the construction of megaprojects: The experience of western consultants working in the gulf cooperation council. DProf thesis, University of Salford, UK.
Walters, R; Jaselskis, E; Zhang, J; Mueller, K and Kaewmoracharoen, M (2008) Using scanning lasers to determine the thickness of concrete pavement. Journal of Construction Engineering and Management, 134(8), pp. 583-591. ISSN 0733-9364
Wambeke, B W; Liu, M and Hsiang, S M (2012) Using Pajek and centrality analysis to identify a social network of construction trades. Journal of Construction Engineering and Management, 138(10), pp. 1192-1201. ISSN 0733-9364
Wang, K; Guo, F; Zhang, C; Hao, J and Wang, Z (2025) Unlocking determinants of smart construction: An integrated model of utaut2, ttf, and perceived risk for IoT acceptance in AEC industry. Engineering, Construction and Architectural Management, 32(8), pp. 5394-5428. ISSN 0969-9988
Wang, D; Dai, F; Ning, X; Dong, R G and Wu, J Z (2017) Assessing work-related risk factors on low back disorders among roofing workers. Journal of Construction Engineering and Management, 143(7): 04017026, ISSN 0733-9364
Wang, P (2019) The aetiology and progression of construction disputes between client and contractor in the UK. PhD thesis, University of Manchester, UK.
Wang, P; Wang, K; Huang, Y; Zhu, J; Fenn, P and Zhang, Y (2023) Payment issues in China's construction industry: Nature, causes, and a predictive model. Journal of Construction Engineering and Management, 149(1): 04022144, ISSN 0733-9364
Wang, Y; Zhu, S and Wong, A S T (2014) Cooling time estimation of newly placed hot-mix asphalt pavement in different weather conditions. Journal of Construction Engineering and Management, 140(5): 04014009, ISSN 0733-9364
Wang, Y-P (2021) How level of detail of activity duration data influences look-ahead schedule performance in prefabricated construction. PhD thesis, Stanford University, USA.
Wani, D (1997) Strategies to increase the degree of participation of local companies in construction projects in developing countries. PhD thesis, University of Leeds, UK.
Waqar, A. and Shafiq, N. (2026) Impact of digital twin technology implementation on the lifecycle management of structural assets. Engineering, Construction and Architectural Management, 33(7), pp. 5715-5736. ISSN 0969-9988
Wasserman, B (2012) Wash water in the mix: Effects on the compressive strength of concrete. International Journal of Construction Education and Research, 8(4), pp. 301-316. ISSN 1557-8771
Watson, K J and Whitley, T (2017) Applying social return on investment to the built environment. Building Research & Information, 45(8), pp. 875-891. ISSN 0961-3218
Webb, D H (2018) Development of risk-based measurements and metrics for sustainability quantification of manufactured and constructed systems. PhD thesis, University of Maryland, College Park, USA.
Weber, P A (2000) Requisite skill differences of baccalaureate graduates among three building disciplines. PhD thesis, Colorado State University, USA.
Wee, T P Y (2019) Product planning of manufactured construction products. PhD thesis, Imperial College London, UK.
Weerasinghe, A S; Ramachandra, T and Rotimi, J O B (2022) Towards sustainable commercial buildings: An analysis of operation and maintenance (O&M) costs in Sri Lanka. Smart and Sustainable Built Environment, 11(3), pp. 454-468. ISSN 2046-6099
Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531
Wenninger, S (2022) Data-driven support and risk modeling for a successful heat transition in the building sector. PhD thesis, Universitaet Bayreuth, Germany.
Whyte, A and Edge, H M (1999) Addressing discord in the team: Beyond third party management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Wiethe, C (2022) Applying artificial intelligence and quantitative finance for a successful heat transition in the building sector. PhD thesis, Universitaet Bayreuth, Germany.
Williams, T (1999) Allocation of contingency in activity duration networks. Construction Management and Economics, 17(4), pp. 441-447. ISSN 01446193
Williams T, W M R P (2013) Target cost contracts: Adopting innovative incentive mechanisms to improve the project delivery process. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Willis, M A (1979) The effects of cyclical demand on industry structure and on the rate of technological change: An international comparison of the housebuilding sectors in the United States, Great Britain and France. PhD thesis, Yale University, USA.
Wilson, M T (2020) Assessing voluntary resilience standards and impacts of flood risk information. Building Research & Information, 48(1), pp. 84-100. ISSN 0961-3218
Windapo, A O and Goulding, J (2013) Value-based perspectives of stakeholders' building requirements in low cost and government subsidised housing projects in South Africa. Construction Innovation, 13(4), pp. 424-444. ISSN 1471-4175
Withana-Gamage, I S (2011) A waste minimisation framework for the procurement of design and build construction projects. PhD thesis, Loughborough University, UK.
Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.
Wong, C H; Holt, G D and Harris, P (2001) Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences. Engineering, Construction and Architectural Management, 8(4), pp. 257-271. ISSN 0969-9988
Wood, G; Davis, P; Byrne, P; McAllister, P and Wyatt, P (2011) Precisely wrong or roughly right? An evaluation of development viability appraisal modelling. Journal of Financial Management of Property and Construction, 16(3), pp. 249-271. ISSN 1366-4387
Wu, Z.; Park, A.; Awada, M. and Assaad, R. H. (2026) School building conditions and chronic absenteeism within socioeconomic contexts: A component-level statistical analysis in New York state. Engineering, Construction and Architectural Management, 33(15), pp. 432-457. ISSN 0969-9988
Wu, D; Chan, E H W and Shen, L (2004) Scoring system for measuring contractor's environmental performance. Journal of Construction Research, 5(1), pp. 139-147. ISSN 1609-9451
Wu, Shaoze (2024) Enhancing construction workforce safety through formulating an augmented reality digital twin system. PhD thesis, RMIT University, Australia.
Wuni, I Y and Mazher, K M (2024) Ending the suitability quantification dilemma: Intelligent decision support system for modular integrated construction in a high-density metropolis. Construction Innovation, 24(4), pp. 1026-1047. ISSN 1471-4175
Xiao, H and Proverbs, D (2001) A comparison of contractor performance in Japan, the UK and the USA: Some preliminary findings from a new approach. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Xiao, H and Proverbs, D (2002) The performance of contractors in Japan, the UK and the USA: A comparative evaluation of construction cost. Construction Management and Economics, 20(5), pp. 425-435. ISSN 01446193
Xiao, H and Proverbs, D (2002) Construction time performance: An evaluation of contractors from Japan, the UK and the US. Engineering, Construction and Architectural Management, 9(2), pp. 81-89. ISSN 0969-9988
Xu, J; Jin, R; Piroozfar, P; Wang, Y; Kang, B G; Ma, L; Wanatowski, D and Yang, T (2018) Constructing a BIM climate-based framework: Regional case study in China. Journal of Construction Engineering and Management, 144(11): 04018105, ISSN 0733-9364
Xu, M; Duffield, C and Ma, J (2011) Performance of mid-project reviews (MPRs): Quantification based on fuzzy recognition. Built Environment Project and Asset Management, 1(2), pp. 137-155. ISSN 2044-124X
Xu, W; Cong, J and Proverbs, D G (2023) Evaluation of infrastructure resilience. International Journal of Building Pathology and Adaptation, 41(2), pp. 378-400. ISSN 23984708
Yalçınkaya Çalışkan, F and Acar, E (2016) An exploratory analysis of continuing professional development perspectives of Turkish architects according to career stages. Architectural Engineering and Design Management, 12(5), pp. 381-406. ISSN 1745-2007
Yang, F; Fei, Y; Guo, L; Bai, X and Li, X (2025) Job crafting intervention for job burnout and work engagement among young construction project management practitioners in China. Engineering, Construction and Architectural Management, 32(1), pp. 536-555. ISSN 0969-9988
Yang, K; Sunindijo, R Y; Wang, C C and Zhang, S (2024) Key leadership competencies in different management levels for digital transformation in construction organisations. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Yang, W; Firouzi, A and Li, C Q (2023) Risk transfer in project finance loans for toll road using credit default swaps. Journal of Financial Management of Property and Construction, 28(1), pp. 1-21. ISSN 1366-4387
Yap, J B H; Skitmore, M; Lim, Y W; Loo, S C and Gray, J (2022) Assessing the expected current and future competencies of quantity surveyors in the Malaysian built environment. Engineering, Construction and Architectural Management, 29(6), pp. 2415-2436. ISSN 0969-9988
Ye, S and Tiong, R L K (2003) The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics, 21(5), pp. 471-482. ISSN 01446193
Ye, Z; Kapogiannis, G; Tang, S; Zhang, Z; Jimenez-Bescos, C and Yang, T (2025) Influence of an integrated value-based asset condition assessment in built asset management. Construction Innovation, 25(2), pp. 248-269. ISSN 1471-4175
Yearsley, W S (2007) How differences in heavy civil project set-up practices impact performance. PhD thesis, Colorado State University, USA.
Yenisetty, P T and Bahadure, P (2021) Spatial accessibility measures to educational facilities from public transit: A case of Indian cities. Smart and Sustainable Built Environment, 10(2), pp. 258-273. ISSN 2046-6099
Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects. PhD thesis, University of Manchester, UK.
Yodites, R A (1997) Essential skills needed and training provided for chief school business officials in Los Angeles county to manage new and modernization construction projects. EdD thesis, University of La Verne, USA.
Yong, Y C and Mustaffa, N E (2013) Critical success factors for Malaysian construction projects: An empirical assessment. Construction Management and Economics, 31(9), pp. 959-978. ISSN 1466433X
Yoo, W; Ozer, H and Ham, Y (2019) System-level approach for identifying main uncertainty sources in pavement construction life-cycle assessment for quantifying environmental impacts. Journal of Construction Engineering and Management, 145(2): 04018137, ISSN 0733-9364
Yu, A T W; Javed, A A; Lam, T I; Shen, G Q and Sun, M (2018) Integrating value management into sustainable construction projects in Hong Kong. Engineering, Construction and Architectural Management, 25(11), pp. 1475-1500. ISSN 0969-9988
Yu, J H; Lee, H S and Kim, W (2006) Evaluation model for information systems benefits in construction management processes. Journal of Construction Engineering and Management, 132(10), pp. 1114-1121. ISSN 0733-9364
Yu, W D and Lo, S S (2005) Time-dependent construction social costs model. Construction Management and Economics, 23(3), pp. 327-337. ISSN 01446193
Yu, W D; Wang, K W and Wang, M T (2013) Pricing strategy for best value tender. Journal of Construction Engineering and Management, 139(6), pp. 675-684. ISSN 0733-9364
Yu, X; Mehmood, K; Paulsen, N; Ma, Z and Kwan, H K (2021) Why safety knowledge cannot be transferred directly to expected safety outcomes in construction workers: The moderating effect of physiological perceived control and mediating effect of safety behavior. Journal of Construction Engineering and Management, 147(1): 1965, ISSN 0733-9364
Yu, Y (2022) Use inspired research in using virtual reality for safe operation of exemplar critical infrastructure systems. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.
Yuan, Z; Li, Z; Lei, Z; Yang, Y; Zhang, W; Lin, W and Cao, L (2025) Enhancing the production performance of prefabricated buildings through the integrated optimization of precast component layout and worker allocation. Journal of Construction Engineering and Management, 151(2): 04024200, ISSN 0733-9364
Yun, G Y; Steemers, K and Baker, N (2008) Natural ventilation in practice: Linking facade design, thermal performance, occupant perception and control. Building Research & Information, 36(6), pp. 608-624. ISSN 0961-3218
Zaheer, M I; Ajayi, S O; Sambo Lyson, Z; Oyegoke, A and Kazemi, H (2021) Understanding the key competencies of market-ready building surveying graduates from employers' perspectives. Journal of Engineering, Design and Technology, 19(1), pp. 291-314. ISSN 1726-0531
Zangeneh, P (2021) Knowledge representation and artificial intelligence for management of socio-technical risks in megaprojects. PhD thesis, University of Toronto, Canada.
Zarghami, S A (2022) Prioritizing construction activities: Addressing the flaws of schedule-based indexes. Journal of Construction Engineering and Management, 148(8): 04022069, ISSN 0733-9364
Zarghami, S A (2024) Measuring sensitivity to change orders in construction projects using eigenvector centrality and radius of gyration. Engineering, Construction and Architectural Management, 31(6), pp. 2478-2495. ISSN 0969-9988
Zarghami, S A and Gunawan, I (2020) A domain-specific measure of centrality for water distribution networks. Engineering, Construction and Architectural Management, 27(2), pp. 341-355. ISSN 0969-9988
Zarghami, S A; Gunawan, I and Schultmann, F (2019) Entropy of centrality values for topological vulnerability analysis of water distribution networks. Built Environment Project and Asset Management, 9(3), pp. 412-425. ISSN 2044-124X
Zedan, S and Miller, W (2018) Quantifying stakeholders' influence on energy efficiency of housing: Development and application of a four-step methodology. Construction Management and Economics, 36(7), pp. 375-393. ISSN 01446193
Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X
Zhai, H and Russell, J S (1999) Stochastic modelling and prediction of contractor default risk. Construction Management and Economics, 17(5), pp. 563-576. ISSN 01446193
Zhang, L.; Liu, B.; Ding, T.; Zhang, S. and Fu, Y. (2026) Matching conflict profiles with contractual and relational governance to enhance cooperation in construction projects: Evidence from China. Engineering, Construction and Architectural Management, 33(3), pp. 2606-2624. ISSN 0969-9988
Zhang, S; Duan, J; Sunindijo, R Y and Xu, Q (2026) Building psychological resilience to improve the mental health of construction professionals. Journal of Construction Engineering and Management, 152(4): 04026030, ISSN 0733-9364
Zhang, X.; Huang, J. and Wang, D. (2026) A quantitative method for indoor trajectory analysis of older adults for spatial evaluation and optimization. Building Research & Information, 54(6), pp. 753-774. ISSN 0961-3218
Zhang, D and Ho, C H (2024) Distribution fitting and anova test to analyze pavement sensing patterns for condition assessments. Built Environment Project and Asset Management, 14(4), pp. 663-676. ISSN 2044-124X
Zhang, Guomin (2005) Factors influencing the implementation of raised floor system for the fitout of office buildings in the Australian context. PhD thesis, Queensland University of Technology, Australia.
Zhang, H and Lin, Y (2023) Prediction of ergonomic risks and impacts on construction schedule through agent-based simulation. Journal of Construction Engineering and Management, 149(3): 04022181, ISSN 0733-9364
Zhang, L and El-Gohary, N M (2017) Human-centered value analysis: Building-value aggregation based on human values and building-system integration. Journal of Construction Engineering and Management, 143(8): 04017040, ISSN 0733-9364
Zhang, L and El-Gohary, N M (2021) Axiology-based valuation modeling for human-centered decision making in building planning and design. Journal of Construction Engineering and Management, 147(11): 04021138, ISSN 0733-9364
Zhang, L; Pan, C and Zou, X (2013) Criticality comparison between the repetitive scheduling method and the network model. Journal of Construction Engineering and Management, 139(10): 06013004, ISSN 0733-9364
Zhang, N; Li, X and Yang, F (2025) Dual pathways of mindfulness in construction occupational psychological health: Long- and short-term mechanisms of positive emotions and psychological capital. Journal of Construction Engineering and Management, 151(12): 04025200, ISSN 0733-9364
Zhang, R; Xing, J; Ye, K; Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(3), pp. 367-385. ISSN 0969-9988
Zhang, R P; Cheung, C M and Lei, H (2019) Applications of visualisation technology in construction safety training: A preliminary review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Zhang, S (2017) Pavement surface distress detection, assessment, and modeling using geospatial techniques. PhD thesis, University of New Mexico, USA.
Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing. PhD thesis, University of Florida, USA.
Zhang, Xutong (2025) Physics-guided machine learning for condition assessment of building structures in operational environments. PhD thesis, University of Technology Sydney, Australia.
Zhang, Y; Chang, R; Mao, W; Zuo, J; Liu, L and Han, Y (2024) Challenges of automating interior construction progress monitoring. Journal of Construction Engineering and Management, 150(9): 03124004, ISSN 0733-9364
Zhang, Z (2021) Participatory ergonomics in construction: Enabling practice-to-research-to-practice via the 2safemodel. PhD thesis, University of Washington, USA.
Zhao, X; Hwang, B G and Low, S P (2014) Investigating enterprise risk management maturity in construction firms. Journal of Construction Engineering and Management, 140(8): 05014006, ISSN 0733-9364
Zhao, Y (2016) Green supply chain management drivers/pressures, practices and performance in Chinese construction industry. PhD thesis, Anglia Ruskin University, UK.
Zhao, Y; Mantha, B R K; Knijnenburg, B P and Li, D (2025) Exploring the feasibility of mobile robots for post-occupancy evaluations. Building Research & Information, 53(1-2), pp. 165-182. ISSN 0961-3218
Zhao, Z; Wang, X; Ji, Y; Liu, H; Liu, X and Yao, F (2025) Analysis of quality-influencing factors of adopting prefabricated steel structure housings: Based on the ISM-MICMAC model. Journal of Construction Engineering and Management, 151(8): 04025098, ISSN 0733-9364
Zhikun, D; Fungfai, N G and Jiayuan, W (2010) Personal construct based factors affecting willingness to share knowledge between architects in a project design team. International Journal of Construction Management, 10(3), pp. 1-11. ISSN 1562-3599
Zhou, Y; Wang, X; Gosling, J and Naim, M M (2023) The system dynamics of engineer-to-order construction projects: Past, present, and future. Journal of Construction Engineering and Management, 149(5): 03123004, ISSN 0733-9364
Zhu, F; Wang, L; Yu, M and Yang, X (2020) Quality of conflict management in construction project context: Conceptualization, scale development, and validation. Engineering, Construction and Architectural Management, 27(5), pp. 1191-1211. ISSN 0969-9988
Zhu, Y; Ahmad, I and Wang, L (2009) Estimating work zone road user cost for alternative contracting methods in highway construction projects. Journal of Construction Engineering and Management, 135(7), pp. 601-608. ISSN 0733-9364
Zomer, T (2021) Institutional pressures and decoupling in projects: the case of BIM Level 2 and coercive isomorphism in the UK's construction sector. PhD thesis, University of Cambridge, UK.
Zong, H; Wang, G and Cao, D (2025) Collaborative networks between contractors and subcontractors for infrastructure development: A comparative study of national quality award projects in China. Engineering, Construction and Architectural Management, 32(2), pp. 1074-1096. ISSN 0969-9988
Zubairu, S N (1998) Maintenance of government office buildings in Nigeria: A post-occupancy evaluation approach. PhD thesis, University of Lagos, Nigeria.
da Silva, M B C; Moschen, S D A; Cecatto, B and Larentis, F (2022) Perceived attributes and dimensions of accessibility in adapted bathrooms. Building Research & Information, 50(1-2), pp. 60-73. ISSN 0961-3218
du Toit, J and Wagner, C (2020) The effect of housing type on householders' self-reported participation in recycling. Smart and Sustainable Built Environment, 9(4), pp. 395-412. ISSN 2046-6099
van Wyk, L; Kajimo-Shakantu, K and Opawole, A (2024) Adoption of innovative technologies in the South African construction industry. International Journal of Building Pathology and Adaptation, 42(3), pp. 410-429. ISSN 23984708
van der Veen, B; Voordijk, H and Dorée, A (2001) Innovation of construction in the Dutch railways: Lessons from inter-organizational co-operation. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Up a level