Items with Subject: manufacturing engineering

Number of items: 1029.

Abadi, A A; Poerbo, H W; Yuwono, T and Isnandya, A R (2024) Balancing Act: Promoting Affordable Housing in Jakarta's Transit-Oriented Development through Public-Private Partnership. Journal of Construction in Developing Countries, 29(S1), pp. 287-314. ISSN 1823-6499

Abbasi, Mostafa (2017) Enhance the construction industry performance through lean applications. PhD thesis, Politecnico di Milano, Italy.

Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599

Abdelaal, A; Ma, J; Zhang, H; Shobeiri, V and Xie, Y M (2026) Bio-stabilized modular rammed earth blocks for sustainable and aesthetic construction. Construction Innovation, 26(9), pp. 1-20. ISSN 1471-4175

Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364

Abu Hammad, A A (2003) A decision support system for manufactured housing production process planning and facility layout. PhD thesis, University of Cincinnati, USA.

Adams, O (1997) Contractor development in Nigeria: Perceptions of contractors and professionals. Construction Management and Economics, 15(1), pp. 95-108. ISSN 01446193

Adel Ahmadian, A (2020) Computational design for cooperative robotic assembly of nonstandard timber frame buildings. DSc thesis, ETH Zürich, Switzerland.

Adeleye, T; Huang, M; Huang, Z and Sun, L (2013) Predicting loss for large construction companies. Journal of Construction Engineering and Management, 139(9), pp. 1224-1236. ISSN 0733-9364

Adenuga, O A (2008) Evaluation of maintenance management practice in public hospital, buildings in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.

Adibfar, A (2020) Bridge digital twins: Fusion of intelligent transportation systems (ITS) sensor data and bridge information modeling (BRIM) for interoperability. PhD thesis, University of Florida, USA.

Adjei, S D (2016) Review of waste management in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Afeez, A and Kumar, A (2013) Application of CAD and reverse engineering methodology for development of complex assemblies. Journal of Engineering, Design and Technology, 11(3), pp. 375-390. ISSN 1726-0531

Afifi, M; Fotouh, A; Al-Hussein, M and Abourizk, S (2022) Integrated lean concepts and continuous/discrete-event simulation to examine productivity improvement in door assembly-line for residential buildings. International Journal of Construction Management, 22(13), pp. 2423-2434. ISSN 1562-3599

Afshar, M R and Asadzadeh Zenozi, H (2022) Introducing a fuzzy MCDM model for financial management in multiple project environments. Construction Innovation, 22(2), pp. 305-319. ISSN 1471-4175

Afum, E; Sun, Z; Agyabeng-Mensah, Y and Baah, C (2023) Lean production systems, social sustainability performance and green competitiveness: The mediating roles of green technology adoption and green product innovation. Journal of Engineering, Design and Technology, 21(1), pp. 206-227. ISSN 1726-0531

Agapiou, A (2020) Factors influencing the selection of a procurement route for UK off-site housebuilding. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 3-15. ISSN 17514304

Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193

Agbulos, A; Mohamed, Y; Al-Hussein, M; Abourizk, S and Roesch, J (2006) Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews. Journal of Construction Engineering and Management, 132(3), pp. 291-299. ISSN 0733-9364

Aggarwal, A; Rani, A and Kumar, M (2020) A robust method to authenticate car license plates using segmentation and ROI based approach. Smart and Sustainable Built Environment, 9(4), pp. 737-747. ISSN 2046-6099

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Aghimien, D O; Aigbavboa, C O; Oke, A E and Thwala, W D (2020) Mapping out research focus for robotics and automation research in construction-related studies: A bibliometric approach. Journal of Engineering, Design and Technology, 18(5), pp. 1063-1079. ISSN 1726-0531

Agustí-Juan, I (2018) Sustainability assessment and development of guidelines for digital fabrication in construction. DSc thesis, ETH Zürich, Switzerland.

Agyekum-Mensah, G; Knight, A and Pasquire, C (2012) Adaption of structured analysis design techniques methodology for construction project planning. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ahankoob, A.; Calixto, V.; Abbasnejad, B. and Wong, P. S. P. (2026) A generative BIM approach for DfMA integration into building facade design. International Journal of Construction Management, 26(9), pp. 1858-1878. ISSN 1562-3599

Ahlstrand, R (2022) Structures of subcontracting: Work organisation, control, and labour in the Swedish building sector. PhD thesis, Lund University, Sweden.

Ahmad, S; Soetanto, R and Goodier, C (2019) Lean approach in precast concrete component production. Built Environment Project and Asset Management, 9(3), pp. 457-470. ISSN 2044-124X

Ahmed, S M (1993) An integrated total quality management (TQM) model for the construction process. PhD thesis, Georgia Institute of Technology, USA.

Ahn, Sang Jun (2019) Transportation framework in panelized construction for residential building. PhD thesis, University of Alberta, Canada.

Aka, A; Bamgbade, A A; Saidu, I and Balogun, O M (2019) A conceptual framework for waste identification and reduction in Nigerian sandcrete blocks production process. Construction Innovation, 19(3), pp. 405-423. ISSN 1471-4175

Aka, A; Isah, A D; Eze, C J and Timileyin, O (2020) Application of lean manufacturing tools and techniques for waste reduction in Nigerian bricks production process. Engineering, Construction and Architectural Management, 27(3), pp. 658-679. ISSN 0969-9988

Akbas, R (2003) Geometry-based modeling and simulation of construction processes. PhD thesis, Stanford University, USA.

Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK. PhD thesis, University of Salford, UK.

Akinradewo, O; Aigbavboa, C; Aghimien, D; Oke, A and Ogunbayo, B (2023) Modular method of construction in developing countries: The underlying challenges. International Journal of Construction Management, 23(8), pp. 1344-1354. ISSN 1562-3599

Akintoye, A (1995) Just-in-time application and implementation for building material management. Construction Management and Economics, 13(2), pp. 105-113. ISSN 01446193

Aksenova, G and Oti-Sarpong, K (2024) Beyond "platformania" in the construction sector: Conceptualisations and implications of product platformisation in the UK. Construction Management and Economics, 42(3), pp. 229-250. ISSN 01446193

Al Asali, M W (2020) Craft-inclusive construction: design strategies for thin-tile vaulting. PhD thesis, University of Cambridge, UK.

Al Hosani, S (2022) A framework for the implementation of 'Lean' construction principles in Engineering, Procurement and Construction (EPC) in the oil and gas industry. PhD thesis, Aberystwyth University, UK.

Al Jassmi, H; Al Ahmad, M and Ahmed, S (2021) Automatic recognition of labor activity: A machine learning approach to capture activity physiological patterns using wearable sensors. Construction Innovation, 21(4), pp. 555-575. ISSN 1471-4175

Al-Bazi, A and Dawood, N (2018) Simulation-based optimisation using simulated annealing for crew allocation in the precast industry. Architectural Engineering and Design Management, 14(1-2), pp. 109-126. ISSN 1745-2007

Al-Khazraji, M S; Bakhy, S H and Jweeg, M J (2024) Composite sandwich structures: Review of manufacturing techniques. Journal of Engineering, Design and Technology, 22(5), pp. 1616-1636. ISSN 1726-0531

Al-Mutairi, Y (2015) Development of implementation strategies for offsite construction techniques in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Al-Nasser, A A (2001) Optimisation of construction implemented as a manufacturing process. PhD thesis, University of Sussex, UK.

Al-Rugaib, T A (1996) Project information, office automation, and quality in building production process in Saudi Arabia. PhD thesis, Cardiff University, UK.

Al-Saeed, Y; Edwards, D J and Scaysbrook, S (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK. Construction Innovation, 20(3), pp. 345-377. ISSN 1471-4175

Al-Saeed, Y; Parn, E; Edwards, D J and Scaysbrook, S (2019) A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production: A case study. Journal of Engineering, Design and Technology, 17(5), pp. 960-984. ISSN 1726-0531

Al-Sudairi, A A (2000) Evaluation of construction processes: Traditional practices versus lean principles. PhD thesis, University of Colorado at Boulder, USA.

Al-Sudairi, A A (2007) Evaluating the effect of construction process characteristics to the applicability of lean principles. Construction Innovation, 7(1), pp. 99-121. ISSN 1471-4175

Alabi, A G F; Ajiboye, T K and Olusegun, H D (2010) Investigating the cutting forces in heat treated medium carbon steel when turning on a lathe machine. Journal of Engineering, Design and Technology, 8(1), pp. 80-93. ISSN 1726-0531

Alamri, R (2019) Development of a model for health and safety management in Saudi Arabian oil and gas construction projects. PhD thesis, University of Wolverhampton, UK.

Alanjari, P; Razavialavi, S and AbouRizk, S (2015) Hybrid genetic algorithm-simulation optimization method for proactively planning layout of material yard laydown. Journal of Construction Engineering and Management, 141(10): 06015001, ISSN 0733-9364

Alavi, P; Sobouti, H and Shahbazi, M (2024) Adaptive re-use of industrial heritage and its role in achieving local sustainability. International Journal of Building Pathology and Adaptation, 42(6), pp. 1223-1249. ISSN 2398-4708

Alazzaz, F and Whyte, A (2015) Linking employee empowerment with productivity in off-site construction. Engineering, Construction and Architectural Management, 22(1), pp. 21-37. ISSN 0969-9988

Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials. PhD thesis, Brunel University, UK.

Albarkoly, K (2017) Exploring the maintenance practices and strategies in the Libyan cement industry. PhD thesis, Aston University, UK.

Albert, I (2020) A lean production approach to materials management in the Nigerian construction industry. PhD thesis, Nelson Mandela University, South Africa.

Alexandrou, K; Thravalou, S and Artopoulos, G (2024) Heritage-BIM for energy simulation: A data exchange method for improved interoperability. Building Research & Information, 52(3), pp. 373-386. ISSN 0961-3218

Alfieri, E; Seghezzi, E; Sauchelli, M; Di Giuda, G M and Masera, G (2020) A BIM-based approach for DfMA in building construction: Framework and first results on an Italian case study. Architectural Engineering and Design Management, 16(4), pp. 247-269. ISSN 1745-2007

Alhusban, A A; Alhusban, S A and Al-Betawi, Y N (2019) Assessing the impact of urban Syrian refugees on the urban fabric of Al Mafraq city architecturally and socially. International Journal of Disaster Resilience in the Built Environment, 10(2-3), pp. 99-129. ISSN 1759-5916

Ali Khan, M S; Suresh, A and Ramaiah, N S (2016) Numerical study of magnetic circuit response in magneto-rheological damper. Journal of Engineering, Design and Technology, 14(1), pp. 196-210.

Alinaitwe, H M (2009) Prioritising lean construction barriers in Uganda's construction industry. Journal of Construction in Developing Countries, 14(1), pp. 15-30. ISSN 1823-6499

Allen, C and Smallwood, J (2008) Improving construction planning through 4D planning. Journal of Engineering, Design and Technology, 6(1), pp. 7-20. ISSN 1726-0531

Alruwaythi, O and Goodrum, P (2019) A difference in perspective: Impact of different formats of engineering information and spatial cognition on craft-worker eye-gaze patterns. Journal of Construction Engineering and Management, 145(11): 04019065, ISSN 0733-9364

Alves, T d C L (2005) Buffering practices in HVAC ductwork supply chains. PhD thesis, University of California, Berkeley, USA.

Alves, T d C L; Milberg, C and Walsh, K D (2012) Exploring lean construction practice, research, and education. Engineering, Construction and Architectural Management, 19(5), pp. 512-525. ISSN 0969-9988

Alvi, M I A (1990) The low-income housing production process in Lahore, Pakistan. PhD thesis, City of Birmingham Polytechnic, UK.

Amarasinghe, A A S R; Agdas, D and Dawes, L (2025) Evaluating labour productivity and profitability in precast concrete manufacturing. Engineering, Construction and Architectural Management, 32(13), pp. 148-173. ISSN 0969-9988

Amarasinghe, Sam (2025) Performance optimizing for precast concrete construction. PhD thesis, Queensland University of Technology, Australia.

Amewornu, E M and Nwulu, N I (2021) A framework for the techno-economic and reliability analysis of grid connected microgrids. Journal of Engineering, Design and Technology, 19(3), pp. 659-685. ISSN 1726-0531

Ammar, M (2016) Aerial construction: Robotic fabrication of tensile structures with flying machines. DSc thesis, ETH Zürich, Switzerland.

Amunzu, I C (2020) A qualitative case study of construction managers’ understanding of lean thinking. PhD thesis, Grand Canyon University, USA.

Aouad, R and Amara, I (2018) Influence of the cutting condition on the wear and the surface roughness in the steel aisi 4140 with mixed ceramic and diamond tool. Journal of Engineering, Design and Technology, 16(6), pp. 828-836. ISSN 1726-0531

Aramvareekul, P (2003) An analysis of labor productivity in the United States construction industry. PhD thesis, State University of New York at Buffalo, USA.

Arashpour, M; Heidarpour, A; Akbar Nezhad, A; Hosseinifard, Z; Chileshe, N and Hosseini, R (2020) Performance-based control of variability and tolerance in off-site manufacture and assembly: Optimization of penalty on poor production quality. Construction Management and Economics, 38(6), pp. 502-514. ISSN 01446193

Arashpour, M; Wakefield, R; Abbasi, B; Arashpour, M and Hosseini, R (2018) Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. Architectural Engineering and Design Management, 14(1-2), pp. 46-59. ISSN 1745-2007

Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2014) Analysis of disruptions caused by construction field rework on productivity in residential projects. Journal of Construction Engineering and Management, 140(2): 04013053, ISSN 0733-9364

Araujo, Luís Otávio Cocito de (2005) Method to propose directions improving labor productivity in the steel reinforcement activities. PhD thesis, Universidade de São Paulo, Brazil.

Araújo, L G and Lucko, G (2016) Slip chart-inspired project schedule diagramming: Links, extension to network schedules, and unification. Journal of Construction Engineering and Management, 142(7): 4016011, ISSN 0733-9364

Arbulu, R J; Tommelein, I D; Walsh, K D and Hershauer, J C (2003) Value stream analysis of a re-engineered construction supply chain. Building Research & Information, 31(2), pp. 161-171. ISSN 0961-3218

Arkani, S (1999) Contractual interfaces: the implications of building production process management and interorganisational relations for productivity in building project coalitions. PhD thesis, University of Greenwich, UK.

Assaad, R; El-Adaway, I H; Hastak, M and Needy, K L (2020) Commercial and legal considerations of offsite construction projects and their hybrid transactions. Journal of Construction Engineering and Management, 146(12): 05020019, ISSN 0733-9364

Assaad, R A (1991) Structured labor markets: The case of the construction sector in Egypt. PhD thesis, Cornell University, USA.

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) The impact of offsite construction on the workforce: Required skillset and prioritization of training needs. Journal of Construction Engineering and Management, 148(7): 04022056, ISSN 0733-9364

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) Quantification of the state of practice of offsite construction and related technologies: Current trends and future prospects. Journal of Construction Engineering and Management, 148(7): 04022055, ISSN 0733-9364

Auradkar, P K; Raykar, A; Agarwal, I; Sitaram, D and Manavalan R (2022) Accuracy assessment and performance analysis of raster to vector conversions on lulc data: India. Journal of Engineering, Design and Technology, 20(6), pp. 1787-1809. ISSN 1726-0531

Austin, S A; Baldwin, A N and Steele, J L (2002) Improving building design through integrated planning and control. Engineering, Construction and Architectural Management, 9(3), pp. 249-258. ISSN 0969-9988

Awodele, I A; Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), pp. 19-36. ISSN 1823-6499

Ayinla, K (2021) Development of a semantic knowledge modelling approach for evaluating offsite manufacturing production processes. PhD thesis, Birmingham City University, UK.

Ayinla, K; Cheung, F and Skitmore, M (2022) Process waste analysis for offsite production methods for house construction: A case study of factory wall panel production. Journal of Construction Engineering and Management, 148(1): 05021011, ISSN 0733-9364

Ayinla, K; Cheung, F and Towe, B (2025) Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding. Construction Management and Economics, 43(8), pp. 637-656. ISSN 0144-6193

Ayinla, K O; Cheung, F and Tawil, A R (2020) Demystifying the concept of offsite manufacturing method: Towards a robust definition and classification system. Construction Innovation, 20(2), pp. 223-246. ISSN 1471-4175

Azam, M A M; Ross, A D; Fortune, C J and Jaggar, D (1998) An information strategy to support effective construction design decision making. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects. PhD thesis, University of Alberta, Canada.

Badra, N; Hegazy, H; Mousa, M; Zhang, J; Syed Zakaria, S A; Aboul Haggag, S and Abdul-Rashied, I (2025) Preliminary cost forecasting and optimization for the construction of steel pedestrian bridges in Egypt. Engineering, Construction and Architectural Management, 32(4), pp. 2210-2241. ISSN 0969-9988

Bai, S; Li, M; Song, L and Kong, R (2021) Developing a common library of prefabricated structure components through graphic media mapping to improve design efficiency. Journal of Construction Engineering and Management, 147(1): 1954, ISSN 0733-9364

Bailey, D (2016) A performance evaluation of mainstream timber framed and traditional masonry housing in the UK. PhD thesis, University of Nottingham, UK.

Balina, C M (2002) Using labor productivity data to evaluate the application of lean principles to the concrete construction process. PhD thesis, Pennsylvania State University, USA.

Ballard, G (2002) Managing work flow on design projects: A case study. Engineering, Construction and Architectural Management, 9(3), pp. 284-291. ISSN 0969-9988

Ballard, G; Harper, N and Zabelle, T (2003) Learning to see work flow: An application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), pp. 6-14. ISSN 0969-9988

Ballard, G and Howell, G A (2003) Lean project management. Building Research & Information, 31(2), pp. 119-133. ISSN 0961-3218

Balogun, T B and Shahid, T (2022) Exploring the adoption of platform-based design for manufacture and assembly in the UK construction sector: A stakeholder perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Bamisile, A (1991) A communication system approach to the management of quality in construction. PhD thesis, Open University, UK.

Banks, C; Kotecha, R; Curtis, J; Dee, C; Pitt, N and Papworth, R (2018) Enhancing high-rise residential construction through design for manufacture and assembly: A UK case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 164-174. ISSN 17514304

Bao, Z; Laovisutthichai, V; Tan, T; Wang, Q and Lu, W (2022) Design for manufacture and assembly (dfma) enablers for offsite interior design and construction. Building Research & Information, 50(3), pp. 325-338. ISSN 0961-3218

Barkokebas, B; Al-Hussein, M and Hamzeh, F (2023) Assessment of digital twins to reassign multiskilled workers in offsite construction based on lean thinking. Journal of Construction Engineering and Management, 149(1): 04022143, ISSN 0733-9364

Barkokebas, B; Khalife, S; Al-Hussein, M and Hamzeh, F (2021) A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction. Engineering, Construction and Architectural Management, 28(8), pp. 2155-2175. ISSN 0969-9988

Barlow, J; Childerhouse, P; Gann, D; Hong-Minh, S; Naim, M and Ozaki, R (2003) Choice and delivery in housebuilding: Lessons from Japan for UK housebuilders. Building Research & Information, 31(2), pp. 134-145. ISSN 0961-3218

Barnes, Andrew Floyd (2021) Instructional video object-based learning in a flipped construction management classroom. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal. PhD thesis, University of Southampton, UK.

Barros, Mércia Maria Semensato Bottura de (1996) A model to introduce innovative technologies into the building construction. PhD thesis, Universidade de São Paulo, Brazil.

Barth, Karina Bertotto (2023) Performance measurement systems to support the implementation of the lean philosophy in production management in construction. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Barthel, P-A (2016) Morocco in the era of eco-urbanism: Building a critical and operational research on an emerging practice in Africa. Smart and Sustainable Built Environment, 5(3), pp. 272-288. ISSN 2046-6099

Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364

Bashir, A M; Suresh, S; Proverbs, D and Gameson, R (2011) A critical, theoretical, review of the impacts of lean construction tools in reducing accidents on construction sites. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Bassioni, H; Emasry, M I; Ragheb, A M and Youssef, A A (2012) Time series analysis for the prediction of RC material components prices in Egypt. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Bataglin, Fernanda Saidelles (2023) Prescriptive conceptual framework for planning and controlling engineer-to-order industrialized building systems. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.

Beech, N (2012) Constructing everyday life: an architectural history of the South Bank in production, 1948-1951. PhD thesis, University College London, UK.

Behnisch, M and Ultsch, A (2009) Urban data-mining: Spatiotemporal exploration of multidimensional data. Building Research & Information, 37(5-6), pp. 520-532. ISSN 0961-3218

Bekdik, B; Pörzgen, J; Bull, S S and Thuesen, C (2018) Modularising design processes of façades in Denmark: Re-exploring the use of design structure matrix. Architectural Engineering and Design Management, 14(1-2), pp. 95-108. ISSN 1745-2007

Bendi, D; Rana, M Q; Arif, M; Goulding, J S and Sawhney, A (2021) An off-site construction readiness maturity model for the Indian construction sector. Construction Innovation, 21(1), pp. 123-142. ISSN 1471-4175

Bendi, D; Rana, M Q; Arif, M; Lamb, S M; Sawhney, A and Kaushik, A K (2022) Assessing off-site readiness in construction organisations: Cases from India. Construction Innovation, 22(2), pp. 320-341. ISSN 1471-4175

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.

Benhaim, M and Birchall, D W (1998) Interfirm relationships within the construction industry: A comparative study between France and the UK. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.

Bennett, J (1993) Japan's building industry: The new model. Construction Management and Economics, 11(1), pp. 3-17. ISSN 01446193

Berawi, M A; Sari, M; Oktaviani, A D; Miraj, P; Susantono, B and Woodhead, R (2025) Impact of BIM and 3D printing technologies on production process and productivity of precast concrete in construction project. International Journal of Construction Management, 25(6), pp. 650-660. ISSN 1562-3599

Bernold, L E (1989) Simulation of nonsteady construction processes. Journal of Construction Engineering and Management, 115(2), pp. 163-178. ISSN 0733-9364

Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364

Best, R (2012) International comparisons of cost and productivity in construction: A bad example. Construction Economics and Building, 12(3), pp. 82-88. ISSN 2204-9029

Beyh, S (2004) Computer and communication engineering: internet protocol telephony in construction. PhD thesis, University of Salford, UK.

Bhat, A; Gupta, V; Aulakh, S S and Elsen, R S (2023) Generative design and analysis of a double-wishbone suspension assembly: A methodology for developing constraint oriented solutions for optimum material distribution. Journal of Engineering, Design and Technology, 21(3), pp. 927-942. ISSN 1726-0531

Bigdellou, S and Chen, Q (2026) Quantification of economic influences on technology adoption and diffusion in the construction industry. International Journal of Construction Management, 26(4), pp. 621-638. ISSN 1562-3599

Bildsten, L (2014) Buyer-supplier relationships in industrialized building. Construction Management and Economics, 32(1-2), pp. 146-159. ISSN 01446193

Bildsten, L (2016) Purchasing in construction companies. PhD thesis, Lund University, Sweden.

Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.

Blindheim, J; Elverum, C W; Welo, T and Steinert, M (2020) Concept evaluation in new product development: A set-based method utilizing rapid prototyping and physical modelling. Journal of Engineering, Design and Technology, 18(5), pp. 1139-1151. ISSN 1726-0531

Blismas, N; Gibb, A and Pasquire, C (2005) Assessing project suitability for off-site production. Construction Economics and Building, 5(1), pp. 9-15. ISSN 2204-9029

Blismas, N; Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(2), pp. 121-130. ISSN 01446193

Blismas, N G (2001) Multi project environments of construction clients. PhD thesis, Loughborough University, UK.

Blismas, N G; Pendlebury, M; Gibb, A and Pasquire, C (2005) Constraints to the use of off-site production on construction projects. Architectural Engineering and Design Management, 1(3), pp. 153-162. ISSN 1745-2007

Bokor, O (2022) Improving labour productivity in construction. A hybrid machine learning approach. PhD thesis, University of Northumbria at Newcastle, UK.

Bonev, M; Wörösch, M and Hvam, L (2015) Utilizing platforms in industrialized construction: A case study of a precast manufacturer. Construction Innovation, 15(1), pp. 84-106. ISSN 1471-4175

Bonwetsch, T (2015) Robotically assembled brickwork: Manipulating assembly processes of discrete elements. DSc thesis, ETH Zürich, Switzerland.

Booth, Peter Charles (2023) Digitally integrated material practice: Computational methods of engaging non-standardised plantation hardwood in architecture. PhD thesis, University of Technology Sydney, Australia.

Bossink, B A G (2004) Effectiveness of innovation leadership styles: A manager's influence on ecological innovation in construction projects. Construction Innovation, 4(4), pp. 211-228. ISSN 1471-4175

Bowen, P A (1993) A communication-based approach to price modelling and price forecasting in the design phase of the traditional building procurement process in South Africa. Unpublished PhD thesis, University of Port Elizabeth, South Africa.

Boyd, David (2006) Developing a knowledge centric approach to construction education. Architectural Engineering and Design Management, 2(1-2), pp. 149-159. ISSN 1745-2007

Bradford, C W (2017) The impact of the systematic incorporation of tolerances on gypsum board installation. PhD thesis, Indiana State University, USA.

Brandalise, F M P; Formoso, C T and Viana, D D (2022) Development of a typology for understanding visual management concepts and their relationships. Journal of Construction Engineering and Management, 148(7): 04022041, ISSN 0733-9364

Brandalise, Fernanda Marisa Pasinato (2023) A typology for describing and assessing visual management in construction projects. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Brandín, R and Abrishami, S (2021) Information traceability platforms for asset data lifecycle: Blockchain-based technologies. Smart and Sustainable Built Environment, 10(3), pp. 364-386. ISSN 2046-6099

Bray Jr., H G (1994) Domestic construction contractors and ISO 9000 registration. DE thesis, Louisiana Tech University, USA.

Brodetskaia, I; Sacks, R and Shapira, A (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics, 29(12), pp. 1209-1227. ISSN 1466433X

Brooks, T; Bruen, J and Curran, M (2020) The value of 'non-value adding' activity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Brown, M M (1995) The architecture of steel: Site planning and building type in the nineteenth-century American Bessemer steel industry. PhD thesis, University of Pittsburgh, USA.

Bruun, E P G (2024) Structural scaffold-free cooperative robotic fabrication. PhD thesis, Princeton University, USA.

Bryde, D J and Schulmeister, R (2012) Applying lean principles to a building refurbishment project: Experiences of key stakeholders. Construction Management and Economics, 30(9), pp. 777-794. ISSN 1466433X

Buhamdan, S; Alwisy, A; Bouferguene, A and Al-Hussein, M (2019) Novel approach to overcoming discontinuity in knowledge: Application in value-adding frameworks in construction industry. Journal of Construction Engineering and Management, 145(8): 04019045, ISSN 0733-9364

Burford, N K and Smith, F W (1999) Developing a new military shelter system: A technical study in advanced materials and structures. Building Research & Information, 27(2), pp. 64-83. ISSN 0961-3218

Burl, David Graham (2010) Do joint ventures out perform sole ventures in business and financial terms: The case of the construction and property development sectors. PhD thesis, University of the West of Scotland, UK.

Burman, E (2016) Assessing the operational performance of educational buildings against design expectations: a case study approach. PhD thesis, University College London, UK.

Burns, T M (2007) The effect of selected request for information variables on steel fabrication outcomes. PhD thesis, Indiana State University, USA.

Burrows, B G (1989) Organisation and quality of falsework construction: A socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained. PhD thesis, University of Warwick, UK.

Butt, A A (2014) Life cycle assessment of asphalt roads: Decision support at the project level. PhD thesis, KTH Royal Institute of Technology, Sweden.

Böhme, T; Escribano, A; Heffernan, E E and Beazley, S (2018) Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector. Built Environment Project and Asset Management, 8(3), pp. 253-266. ISSN 2044-124X

Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988

Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.

Campbell, K; Clegg, D R; Perera, T; Stephenson, P and Stevens, A (1997) Simulation in the construction industry: A case-study review. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Carmichael, D G and Karantonis, J P (2015) Construction contracts with conversion capability: A way forward. Journal of Financial Management of Property and Construction, 20(2), pp. 132-146. ISSN 1366-4387

Carmody, S; Spillane, J P and Clarke, N (2022) Barriers to the implementation of modular construction in Ireland: A case study from an Irish small and medium-sized enterprise perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Carollo, Federica Carla (2023) Circularity in the construction and demolition waste management chain. PhD thesis, Politecnico di Milano, Italy.

Carvalho, Karla Maria Paiva de (2020) Proposal of a systemic approach model in risk situations in the steel company. PhD thesis, Universidade Estadual de Campinas, Brazil.

Carvalho, P F M (2023) Tectonics and material transformations: Exploring concrete in architecture through digital fabrication processes. PhD thesis, Universidade do Porto, Portugal.

Castillo, G; Alarcón, L F and González, V A (2015) Implementing lean production in copper mining development projects: Case study. Journal of Construction Engineering and Management, 141(1): 05014013, ISSN 0733-9364

Castillo, T; Alarcón, L F and Salvatierra, J L (2018) Effects of last planner system practices on social networks and the performance of construction projects. Journal of Construction Engineering and Management, 144(3): 04017120, ISSN 0733-9364

Castillo, T; Herrera, R F and Alarcón, L F (2023) The quality of small social networks and their performance in architecture design offices. Journal of Construction Engineering and Management, 149(2): 04022162, ISSN 0733-9364

Castriotto, Caio Magalhães (2023) Reciprocal link a new connection system for reciprocal frame structures developed by algorithmic modeling and digital fabrication. PhD thesis, Universidade Estadual de Campinas, Brazil.

Cha, H S; Kim, J and Han, J Y (2009) Identifying and assessing influence factors on improving waste management performance for building construction projects. Journal of Construction Engineering and Management, 135(7), pp. 647-656. ISSN 0733-9364

Chan, K H (2010) Critica factors in adopting cooling media for central air-conditioning systems in Hong Kong. Architectural Engineering and Design Management, 6(1), pp. 31-47. ISSN 1745-2007

Chan, P and Kaka, A (2003) A blue-collar insight into improving construction labour productivity. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Chan, P; Puybaraud, M C and Kaka, A (2001) Construction training: A linkage to productivity improvements. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Chan, T K (2017) Global supply chains: A preliminary analysis of the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Chandra, Venny (2007) An investigation of cultural learning during the hospital process from a facilities management perspective. PhD thesis, University of New South Wales, Australia.

Chang, Chen-Yu (2002) An economic interpretation of construction procurement behaviour for the commercial and industrial buildings. PhD thesis, University College London, UK.

Chang, J; Xie, X and Parlikad, A K (2025) Cloud-based building information modelling (CBIM): Software engineers' insights into improving asset information quality. Built Environment Project and Asset Management, 15(3), pp. 594-611. ISSN 2044-124X

Chang, V; Xu, Y K; Zhang, J and Xu, Q (2021) Research on intelligent manufacturing development approach for China's local valve industry. Smart and Sustainable Built Environment, 10(2), pp. 293-321. ISSN 2046-6099

Chantawit, D; Hadikusumo, B H W; Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: Visualizing project scheduling and safety planning. Construction Innovation, 5(2), pp. 99-114. ISSN 1471-4175

Charley, J (1995) The dialectic of the built environment: A study in the historical transformation of labour and space. PhD thesis, University of Strathclyde, UK.

Charlson, J (2021) Emerging trends in construction law at the confluence of academia and industry. PhD thesis, University of Wolverhampton, UK.

Charlson, J and Dimka, N (2021) Design, manufacture and construct procurement model for volumetric offsite manufacturing in the UK housing sector. Construction Innovation, 21(4), pp. 800-817. ISSN 1471-4175

Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364

Chen, Q; Adey, B T; Haas, C and Hall, D M (2020) Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies. Construction Innovation, 20(3), pp. 471-508. ISSN 1471-4175

Chen, Q; Adey, B T; Haas, C T and Hall, D M (2022) Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation, 22(1), pp. 76-100. ISSN 1471-4175

Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.

Chen, W; Hu, C; Zou, R; Yang, Q; Chen, Y; Xing, J and Mou, C (2025) Evolutionary method of digital twin model for building physics mechanism. Architectural Engineering and Design Management, 21(2), pp. 356-378. ISSN 1745-2007

Cho, Y (2000) The Korean housebuilding industry: aspects of growth, efficiency and diversification, 1980-1995. PhD thesis, London School of Economics and Political Science, UK.

Chuang, J (2014) The changing foundations of Chinese development: From low-cost labor to land dispossession. PhD thesis, University of California, Berkeley, USA.

Clarke, L and Herrmann, G (2004) Cost vs. Production: Labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), pp. 1057-1066. ISSN 01446193

Clarke, L and Herrmann, G (2004) Cost vs. Production: Disparities in social housing construction in Britain and Germany. Construction Management and Economics, 22(5), pp. 521-532. ISSN 01446193

Coble, R J and Haupt, T C (2000) Effecting safety in affordable housing projects using automation. Journal of Construction Research, 1(1), pp. 1-8. ISSN 1609-9451

Codarin, Sara (2020) Innovative construction systems within building processes: An approach to large-scale robotic additive layer manufacturing for the conservation of cultural heritage. PhD thesis, University of Ferrara, Italy.

Coffey, M and Langford, D (1998) The propensity for employee participation by electrical and mechanical trades in the construction industry. Construction Management and Economics, 16(5), pp. 543-552. ISSN 01446193

Correia, J M; Sutrisna, M and Zaman, A U (2020) Factors influencing the implementation of off-site manufacturing in commercial projects in Western Australia: A proposed research agenda. Journal of Engineering, Design and Technology, 18(6), pp. 1449-1468. ISSN 1726-0531

Costa, S; Sameiro Carvalho, M; Pimentel, C and Duarte, C (2025) Conceptualizing the phenomenon of construction industrialization: linking theory and practice through a cross-sector case study. International Journal of Construction Management, 25(8), pp. 923-931. ISSN 1562-3599

Cox, I D; Morris, J P; Rogerson, J H and Jared, G E (1999) A quantitative study of post contract award design changes in construction. Construction Management and Economics, 17(4), pp. 427-439. ISSN 01446193

Crawford, P and Vogl, B (2006) Measuring productivity in the construction industry. Building Research & Information, 34(3), pp. 208-219. ISSN 0961-3218

Cribbs, J (2016) Workflow management using building information modeling (BIM) for prefabrication in a construction retrofit environment. PhD thesis, Arizona State University, USA.

Cripps, A (2004) Cardboard as a construction material: A case study. Building Research & Information, 32(3), pp. 207-219. ISSN 0961-3218

Da Rocha, C G; Kemmer, S L and Meneses, L (2016) Managing customization strategies to reduce workflow variations in house building projects. Journal of Construction Engineering and Management, 142(8): 5016005, ISSN 0733-9364

Dadashnejad, A A and Valmohammadi, C (2018) Investigating the effect of value stream mapping on operational losses: A case study. Journal of Engineering, Design and Technology, 16(3), pp. 478-500. ISSN 1726-0531

Dadi, G B (2013) Applying cognitive principles to the delivery of engineering information by different mediums. PhD thesis, University of Kentucky, USA.

Dadi, G B; Goodrum, P M; Taylor, T R B and Carswell, C M (2014) Cognitive workload demands using 2D and 3D spatial engineering information formats. Journal of Construction Engineering and Management, 140(5): 04014001, ISSN 0733-9364

Damdelen, O and Tansu, A (2022) Influence of recycled plastic on the thermal transmittance and sustainable assessment of concrete mixes. Journal of Construction Engineering and Management, 148(12): 04022135, ISSN 0733-9364

Daniel, E I (2017) Exploratory study into the use of Last Planner® System and collaborative planning for construction process improvement. PhD thesis, Nottingham Trent University, UK.

Daniel, E I and Oshodi, O (2023) Lean-offsite-simulation nexus for housing construction: A state-of-the-art review of the existing knowledge. Construction Innovation, 23(5), pp. 994-1017. ISSN 1471-4175

Darwish, M; Elsayed, A Y and Nassar, K (2018) Design and constructability of a novel funicular arched steel truss falsework. Journal of Construction Engineering and Management, 144(3): 04018002, ISSN 0733-9364

Dauber, V F (2001) Classical lean constructs and their transferability to the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Dauda, J A; Ajayi, S; Omotayo, T; Oladiran, O O and Ilori, O M (2024) Implementation of lean for small- and medium-sized construction organisational improvement. Smart and Sustainable Built Environment, 13(3), pp. 496-511. ISSN 2046-6099

Dave, B A (2013) Developing a construction management system based on lean construction and building information modelling. PhD thesis, University of Salford, UK.

Davies, M; Jackaway, A; Hardy, R; Dewey, E and Littler, J (2000) A translucent louvre system: Design concepts, modelling work and monitored data. Building Research & Information, 28(1), pp. 42-50. ISSN 0961-3218

Davies, R J (2003) Formulating competitive strategy in the UK housebuilding industry: Executive summary. EngD thesis, University of Warwick, UK.

Davison, N; Goodier, C; Gibb, A; Austin, S; Saker, J and Gregory, C (2006) Factors influencing the market for branded mass customised buildings. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system. PhD thesis, University of Southern California, USA.

Dawood, N and Sikka, S (2007) Measuring the effectiveness of 4D planning as a valuable communication tool. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Dawood, N N; Hobbs, B and Fanning, A (2001) Standardization of brickwork construction: Identification and measurement of standard processes. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

De Araujo, V (2023) Timber construction as a multiple valuable sustainable alternative: Main characteristics, challenge remarks and affirmative actions. International Journal of Construction Management, 23(8), pp. 1334-1343. ISSN 1562-3599

De La Garza, J M and Mitropoulos, P (1991) Technology-transfer (t2) model for expert systems. Journal of Construction Engineering and Management, 117(4), pp. 736-755. ISSN 0733-9364

Delavar, M (2017) BIM assisted design process automation for pre-engineered buildings (PEB). PhD thesis, University of Western Ontario, Canada.

Demian, P and Walters, D (2014) The advantages of information management through building information modelling. Construction Management and Economics, 32(12), pp. 1153-1165. ISSN 01446193

Desgagné-Lebeuf, A; Lehoux, N and Beauregard, R (2022) Scheduling tools for the construction industry: Overview and decision support system for tool selection. International Journal of Construction Management, 22(14), pp. 2687-2698. ISSN 1562-3599

Devaney, S and Roberts, D (2012) Who gets the jobs? Factors influencing the employability of property and construction graduates in the UK. Construction Management and Economics, 30(3), pp. 233-246. ISSN 1466433X

Devine, R D; Barbachyn, S M; Thrall, A P and Kurama, Y C (2018) Effect of tripping prefabricated rebar assemblies on bar spacing. Journal of Construction Engineering and Management, 144(11): 04018099, ISSN 0733-9364

Dhandapani, K and Reddy Sathi, R (2011) Embedded controlled low-frequency AC to high-frequency AC converter fed induction heater. Journal of Engineering, Design and Technology, 9(1), pp. 7-18. ISSN 1726-0531

Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.

Dissart, J C and Ricaurte, L (2023) Assessing social value in housing design: Contributions of the capability approach. Buildings & Cities, 4(1), pp. 867-882. ISSN 2632-6655

Dixit, S; Stefańska, A and Singh, P (2023) Manufacturing technology in terms of digital fabrication of contemporary biomimetic structures. International Journal of Construction Management, 23(11), pp. 1828-1836. ISSN 1562-3599

Doe, Robert (2017) Integration of computational design tools in the design and production of prefabricated homes. PhD thesis, University of Sydney, Australia.

Dowsett, R M; Green, M S and Harty, C F (2022) Speculation beyond technology: Building scenarios through storytelling. Buildings & Cities, 3(1), pp. 534-553. ISSN 2632-6655

Du, J; Xue, Y; Sugumaran, V; Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(4), pp. 1601-1635. ISSN 0969-9988

Duarte, J P and Correia, R (2006) Implementing a description grammar: Generating housing programs online. Construction Innovation, 6(4), pp. 203-216. ISSN 1471-4175

Duksh, Y S; Kaushik, B K; Sarkar, S and Singh, R (2013) Analysis of propagation delay and power with variation in driver size and number of shells in multi walled carbon nanotube interconnects. Journal of Engineering, Design and Technology, 11(1), pp. 19-33. ISSN 1726-0531

Duncheva, T and Bradley, F F (2019) Multifaceted productivity comparison of off-site timber manufacturing strategies in mainland Europe and the United Kingdom. Journal of Construction Engineering and Management, 145(8): 04019043, ISSN 0733-9364

Dunne, J (2007) Design knowledge extraction: A community-based approach to public open space design in Mexico city. Architectural Engineering and Design Management, 3(3), pp. 160-168. ISSN 1745-2007

Dunston, P S and Bernold, L E (2000) Adaptive control for safe and quality rebar fabrication. Journal of Construction Engineering and Management, 126(2), pp. 122-129. ISSN 0733-9364

Dzeng, R J (2006) Identifying a design management package to support concurrent design in building wafer fabrication facilities. Journal of Construction Engineering and Management, 132(6), pp. 606-614. ISSN 0733-9364

Eastman, C M and Sacks, R (2008) Relative productivity in the AEC industries in the United States for on-site and off-site activities. Journal of Construction Engineering and Management, 134(7), pp. 517-526. ISSN 0733-9364

Edouard, M B; Camille, J; Vincent, B and Améziane, A (2025) Design for mixed model final assembly line (dfmmfal): A new tool for assembly interface identification based on assembly process planning. Journal of Engineering, Design and Technology, 23(1), pp. 143-160. ISSN 1726-0531

Edwards, D J (1999) A methodology for predicting the total average hourly maintenance cost of tracked hydraulic excavators operating in the UK opencast mining industry. PhD thesis, University of Wolverhampton, UK.

Edwards, D J (2003) Accident trends involving construction plant: an exploratory analysis. Journal of Construction Research, 4(2), pp. 161-173. ISSN 1609-9451

Edwards, D J and Holt, G D (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(6), pp. 417-427. ISSN 0961-3218

Edwards, D J and Holt, G D (2005) Exposure to hand-arm vibration: Implications of new statutory requirements. Building Research & Information, 33(3), pp. 257-266. ISSN 0961-3218

Edwards, D J and Holt, G D (2006) Hand-arm vibration exposure from construction tools: Results of a field study. Construction Management and Economics, 24(2), pp. 209-217. ISSN 01446193

Edwards, D J and Holt, G D (2007) Construction hand tools: Vibration emissions from alternative inserts. Building Research & Information, 35(3), pp. 329-342. ISSN 0961-3218

Edwards, D J and Holt, G D (2008) Protecting capital investment in plant and equipment: Case study observations of post-theft recovery. Journal of Financial Management of Property and Construction, 13(2), pp. 96-110. ISSN 1366-4387

Edwards, D J and Holt, G D (2008) Health and safety issues relating to construction excavators and their attachments. Engineering, Construction and Architectural Management, 15(4), pp. 321-335. ISSN 0969-9988

Edwards, D J and Holt, G D (2010) Cost-effective risk assessment of hand-arm vibration exposure. Journal of Financial Management of Property and Construction, 15(2), pp. 158-175. ISSN 1366-4387

Edwards, D J; Thorpe, T and Love, P (2004) Financial implications of poorly utilised construction plant and equipment. Journal of Financial Management of Property and Construction, 9(1), pp. 3-12. ISSN 1366-4387

Edwards, D J; Yang, J; Cabahug, R and Love, P E D (2005) Intelligence and maintenance proficiency: An examination of plant operators. Construction Innovation, 5(4), pp. 243-254. ISSN 1471-4175

Edwards, D J and Yisa, S (2001) Modelling the magnitude of plant downtime: A tool for improving plant operations management. Engineering, Construction and Architectural Management, 8(3), pp. 225-232. ISSN 0969-9988

Egbu, C O (2000) Knowledge management in construction SMEs: Coping with the issues of structure, culture, commitment and motivation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Eisazadeh, N; De Troyer, F and Allacker, K (2025) Environmental performance of patient rooms using an integrated approach considering operational energy, daylight and comfort analysis. Smart and Sustainable Built Environment, 14(4), pp. 1117-1142. ISSN 2046-6099

Ekenel, M (2004) Durability performance of advanced construction materials. PhD thesis, University of Missouri - Rolla, USA.

Eksteen, B and Rosenberg, D (2002) The management of overhead costs in construction companies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

El Tayeh, A (2008) Social web-based systems for supporting geographically dispersed project teams in the architecture-engineering-construction industry. PhD thesis, University of Manchester, UK.

Eldin, N N (1988) Constructability improvement of project designs. Journal of Construction Engineering and Management, 114(4), pp. 631-640. ISSN 0733-9364

Elfving, J A (2003) Exploration of opportunities to reduce lead times for engineered-to-order products. PhD thesis, University of California, Berkeley, USA.

Elliman, T and Orange, G (2003) Developing distributed design capabilities in the construction supply chain. Construction Innovation, 3(1), pp. 15-26. ISSN 1471-4175

Elnaas, E (2014) The decision to use off-site manufacturing systems for house-building projects in the UK. PhD thesis, University of Brighton, UK.

Elnaas, H; Ashton, P and Gidado, K (2009) Decision making process for using off-site manufacturing systems for housing projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Elnaas H, A P G K (2013) A decision evaluation model to choose between manufacturing off-site or on-site methods for construction of house building projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Emmer, M J (2009) A decision process model for closing the structural steel materials loop in construction. PhD thesis, University of Florida, USA.

Emmitt, S; Pasquire, C and Mertia, B (2012) Is good enough "making do"? An investigation of inappropriate processing in a small design and build company. Construction Innovation, 12(3), pp. 369-383. ISSN 1471-4175

Emuze F, S J (2013) Construction motor vehicle accidents in South Africa: Causes and impact. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Emuze F, S J (2013) How can supply chain management proliferate in South African construction? In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Enshassi, M S A; Walbridge, S; West, J S and Haas, C T (2020) Dynamic and proactive risk-based methodology for managing excessive geometric variability issues in modular construction projects using Bayesian theory. Journal of Construction Engineering and Management, 146(2): 04019096, ISSN 0733-9364

Ergen, E (2005) Formalization of life-cycle data management of engineered-to-order components using advanced tracking technologies. PhD thesis, Carnegie Mellon University, USA.

Etmektzoglou, Apostolos (2013) The impact of the financial crisis on industrial relations in Greek industry. DBA thesis, Nottingham Trent University, UK.

Eufrasio Espinosa, R M (2015) A visio-spatial life cycle energy model of building materials within a bioregional context: Mapping the embodied energy of fired clay bricks in Cuitzeo, Mexico. PhD thesis, University of Sheffield, UK.

Everett, J G and Slocum, A H (1994) Automation and robotics opportunities: Construction versus manufacturing. Journal of Construction Engineering and Management, 120(2), pp. 443-452. ISSN 0733-9364

Faccio, M; Gamberi, M; Nedaei, M and Pilati, F (2018) Technical and economic modelling and evaluation of a water distribution system equipped with an autoclave for industrial production applications. Journal of Engineering, Design and Technology, 16(3), pp. 342-359. ISSN 1726-0531

Fang, Y and Gao, S (2026) Construction 4.0 technology and lean construction ambidexterity capability in China's construction industry: A sociotechnical systems perspective. Construction Innovation, 26(3), pp. 653-673. ISSN 1471-4175

Fapohunda, J A (2009) Operational framework for optimal utilisation of construction resources during the production process. PhD thesis, Sheffield Hallam University, UK.

Fardhosseini, M S (2021) A quantitative analysis of the impact of integrating digital technology for formwork fabrication on human factors perspectives. PhD thesis, University of Washington, USA.

Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system. PhD thesis, Eindhoven University of Technology, Netherlands.

Feng, P P-Y (2009) Causes and effects of rework on the delivery of healthcare facilities in California. PhD thesis, University of California, Berkeley, USA.

Fernandez-Solis, J L (2013) Building construction: A deterministic non-periodic flow-a case study of chaos theories in tracking production flow. Architectural Engineering and Design Management, 9(1), pp. 21-48. ISSN 1745-2007

Ferreira, Thiago Lopes (2014) Vernacular architecture and contemporary production processes: Formation, experimentation and construction in a Brazilian rural settlement. PhD thesis, Universidade de São Paulo, Brazil.

Fieldson, R (2017) The afterlife clause; towards a strategy for improved adaptation in retail property. International Journal of Building Pathology and Adaptation, 35(4), pp. 364-379.

Filho, A N d M; Filho, F M M; Miranda, A N d and Miranda, M I A d (2005) Improving the root pile execution process through setup time reduction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Finnie, D; Ali, N A and Park, K (2018) Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 176-185. ISSN 17514304

Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Forcael, E (2010) Buffering strategies for managing transportation construction projects. PhD thesis, University of Florida, USA.

Forde, B and Stiemer, S F (1985) Steel construction evaluation by MLR-strategies. Journal of Construction Engineering and Management, 111(2), pp. 149-156. ISSN 0733-9364

Fore, S and Mbohwa, C (2015) Greening manufacturing practices in a continuous process industry: Case study of a cement manufacturing company. Journal of Engineering, Design and Technology, 13(1), pp. 94-122.

Formoso, C; Leite, F and Miron, L (2011) Client requirements management in social housing: A case study on the residential leasing program in Brazil. Journal of Construction in Developing Countries, 16(2), pp. 47-67. ISSN 1823-6499

Formoso, C T; Santos, A D and Powell, J A (2002) An exploratory study on the applicability of process transparency in construction sites. Journal of Construction Research, 3(1), pp. 35-54. ISSN 1609-9451

Formoso, C T; Soibelman, L; De Cesare, C and Isatto, E L (2002) Material waste in building industry: Main causes and prevention. Journal of Construction Engineering and Management, 128(4), pp. 316-325. ISSN 0733-9364

Forsman, S; Björngrim, N; Bystedt, A; Laitila, L; Bomark, P and Öhman, M (2012) Need for innovation in supplying engineer-to-order joinery products to construction: A case study in Sweden. Construction Innovation, 12(4), pp. 464-491. ISSN 1471-4175

Fouchal, F; Hassan, T M and Loveday, D L (2014) Design methodology for integrating multipath systems (building services). Journal of Engineering, Design and Technology, 12(4), pp. 491-506.

Fox, S; Marsh, L and Cockerham, G (2001) Design for manufacture: A strategy for successful application to buildings. Construction Management and Economics, 19(5), pp. 493-502. ISSN 01446193

Fox, S J (2001) Application of design for manufacture principles to building design and construction. PhD thesis, Sheffield Hallam University, UK.

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Franze, Anthony (2024) Augmented fabrication: An Australian industry 4.0 augmented reality (ar) framework. PhD thesis, Queensland University of Technology, Australia.

Freire, J and Alarcón, L F (2002) Achieving lean design process: Improvement methodology. Journal of Construction Engineering and Management, 128(3), pp. 248-256. ISSN 0733-9364

Frutos, J D and Borenstein, D (2003) Object-oriented model for customer-building company interaction in mass customization environment. Journal of Construction Engineering and Management, 129(3), pp. 302-313. ISSN 0733-9364

Fuyama, H (1993) Computer assisted conceptual structural design of steel buildings. PhD thesis, Stanford University, USA.

Gabai, D S; Haronian, E; Sacks, R; Kennard, N S; Wong, N; Miera, M K and Cloyd, T D (2026) Doubling throughput and halving project durations: Lessons from intel's ocf strategy for project portfolio management. Journal of Construction Engineering and Management, 152(2): 04025256, ISSN 0733-9364

Gallardo, C A S; Granja, A D and Picchi, F A (2014) Productivity gains in a line flow precast concrete process after a basic stability effort. Journal of Construction Engineering and Management, 140(4): B4013004, ISSN 0733-9364

Gamal, A; Nashaat, B; Shahda, M M and Nosier, S R (2024) Ten questions concerning the integration of digital fabrication techniques into the architectural design process. Architectural Engineering and Design Management, 20(1), pp. 120-149. ISSN 1745-2007

Ganah, A A M; Anumba, C J and Bouchlaghem, N M (2000) The use of visualization to communicate design information to construction sites. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Gann, D M (1996) Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan. Construction Management and Economics, 14(5), pp. 437-450. ISSN 01446193

Gann, D M and Barlow, J (1996) Flexibility in building use: The technical feasibility of converting redundant offices into flats. Construction Management and Economics, 14(1), pp. 55-66. ISSN 01446193

Gann, D M; Wang, Y and Hawkins, R (1998) Do regulations encourage innovation? The case of energy efficiency in housing. Building Research & Information, 26(5), pp. 280-296. ISSN 0961-3218

Gao, S.; Low, S. P. and Tok, S. K. W. (2026) Applications of lean principles in the operations of architectural and engineering design firms: An exploratory study in Singapore. Engineering, Construction and Architectural Management, 33(4), pp. 2649-2668. ISSN 0969-9988

Gao, Q; Liu, B; Sun, J; Liu, C and Xu, Y (2022) Trade decomposition of CO2 emissions of global construction industries. Engineering, Construction and Architectural Management, 29(1), pp. 502-522. ISSN 0969-9988

Gao, Q; Liu, B; Sun, J; Liu, C and Xu, Y (2023) Border-crossing frequencies of CO2 embodied in international trade of construction products for final demand. Engineering, Construction and Architectural Management, 30(6), pp. 2360-2380. ISSN 0969-9988

Gao, S (2013) The toyota way model: An implementation framework for large Chinese construction firms. PhD thesis, National University of Singapore, Singapore.

Gao, S; Jin, R and Lu, W (2020) Design for manufacture and assembly in construction: A review. Building Research & Information, 48(5), pp. 538-550. ISSN 0961-3218

Gao, S and Low, S P (2015) Implementing Toyota way principles for construction projects in China: A case study. International Journal of Construction Management, 15(3), pp. 179-195. ISSN 1562-3599

Gao, S and Low, S P (2015) Toyota way style human resource management in large Chinese construction firms: A qualitative study. International Journal of Construction Management, 15(1), pp. 17-32. ISSN 1562-3599

García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.

Garg, H C (2012) Theoretical modeling of orifice compensated symmetric hole-entry hybrid journal bearings. Journal of Engineering, Design and Technology, 10(3), pp. 421-435. ISSN 1726-0531

Garnett, N A (2001) Changing construction performance using lean construction: An action research approach. PhD thesis, University of Reading, UK.

Gasu, M B (2020) Residents' satisfaction with the use of green infrastructure in Osogbo, Osun State, Nigeria. African Journal of Built Environment Research, 4(1), pp. 1-19. ISSN 2414-0236

Gee, S (2019) The development of an innovative, lean, mobile factory system to manufacture timber frame closed panels in temporary locations for use in the Assembly of Houses in the Affordable Rented Sector. PhD thesis, University of Liverpool, UK.

Gelaw, M; Ramulu, P J; Hailu, D and Desta, T (2018) Manufacturing and mechanical characterization of square bar made of aluminium scraps through friction stir back extrusion process. Journal of Engineering, Design and Technology, 16(4), pp. 596-615. ISSN 1726-0531

Ghasemi Poor Sabet, Pejman (2020) A hybrid OSM–BIM framework for construction management system. PhD thesis, Curtin University, Australia.

Ghavam, H R (1990) Characteristics of external activators in third world village development. PhD thesis, Colorado State University, USA.

Ghosh, S and Robson, K F (2015) Analyzing the empire state building project from the perspective of lean delivery system: A descriptive case study. International Journal of Construction Education and Research, 11(4), pp. 257-267. ISSN 1557-8771

Gidado, K (2004) Enhancing the prime contractor's pre-construction planning. Journal of Construction Research, 5(1), pp. 87-106. ISSN 1609-9451

Gidado, K I (1996) Project complexity: The focal point of construction production planning. Construction Management and Economics, 14(3), pp. 213-225. ISSN 01446193

Gil, N and Tommelein, I D (2003) Using product and process flexibility to cope with project delivery uncertainty. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193

Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.

Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364

Gillich, A (2025) Market transformations: Gas conversion as a blueprint for net zero retrofit. Buildings & Cities, 6(1), pp. 359-377. ISSN 2632-6655

Gillich, A; Sunikka-Blank, M and Ford, A (2017) Lessons for the UK green deal from the US BBNP. Building Research & Information, 45(4), pp. 384-395. ISSN 0961-3218

Ginigaddara, B; Gajendran, T and Beard, C (2025) A critical review of quantity surveying education in an offsite construction perspective: strategies for up-skilling. Construction Innovation, 25(4), pp. 1058-1084. ISSN 1471-4175

Ginigaddara, B; Perera, S; Feng, Y and Rahnamayiezekavat, P (2022) Offsite construction skills evolution: An Australian case study. Construction Innovation, 22(1), pp. 41-56. ISSN 1471-4175

Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Kagioglou, M (2024) Industry 4.0 driven emerging skills of offsite construction: A multi-case study-based analysis. Construction Innovation, 24(3), pp. 747-769. ISSN 1471-4175

Giri, O P; Sainju, P R and Htet, A (2025) Evaluating occupational health and safety practices in an airport construction project in Nepal. Built Environment Project and Asset Management, 15(1), pp. 149-164. ISSN 2044-124X

Globa, A; Costin, G; Tokede, O; Wang, R; Khoo, C K and Moloney, J (2022) Hybrid kinetic facade: Fabrication and feasibility evaluation of full-scale prototypes. Architectural Engineering and Design Management, 18(6), pp. 791-811. ISSN 1745-2007

Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.

Godoy-Shimizu, D; Hong, S M; Korolija, I; Schwartz, Y; Mavrogianni, A and Mumovic, D (2022) Pathways to improving the school stock of England towards net zero. Buildings & Cities, 3(1), pp. 939-963. ISSN 2632-6655

Gomes, Helton Cristiano (2013) Multi-objective optimization algorithms for the activity sequencing problem in steel construction projects. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

Gonzalez-Ruiz, J D; Arboleda, A; Botero, S and Rojo, J (2019) Investment valuation model for sustainable infrastructure systems: Mezzanine debt for water projects. Engineering, Construction and Architectural Management, 26(5), pp. 850-884. ISSN 0969-9988

Gonzlez, V; Alarcn, L F; Maturana, S and Bustamante, J A (2011) Site management of work-in-process buffers to enhance project performance using the reliable commitment model: Case study. Journal of Construction Engineering and Management, 137(9), pp. 707-715. ISSN 0733-9364

González, V; Alarcón, L F; Maturana, S; Mundaca, F and Bustamante, J (2010) Improving planning reliability and project performance using the reliable commitment model. Journal of Construction Engineering and Management, 136(10), pp. 1129-1139. ISSN 0733-9364

Goodrum, P M; Miller, J; Sweany, J and Alruwaythi, O (2016) Influence of the format of engineering information and spatial cognition on craft-worker performance. Journal of Construction Engineering and Management, 142(9): 04016043, ISSN 0733-9364

Gosling, J (2011) Flexibility strategies for engineer-to-order construction supply chains. PhD thesis, Cardiff University, UK.

Gosling, J; Hewlett, B and Naim, M (2011) A framework for categorising engineer-to-order construction projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gosling, J; Naim, M and Towill, D (2013) Identifying and categorizing the sources of uncertainty in construction supply chains. Journal of Construction Engineering and Management, 139(1), pp. 102-110. ISSN 0733-9364

Gotthelf, H; Ozbek, M E and Guggemos, A (2013) Potential efficiency gains from early involvement of steel fabricators and erectors: Lessons learned from the nrel research support facility project. International Journal of Construction Education and Research, 9(2), pp. 147-160. ISSN 1557-8771

Goulding, J S; Pour Rahimian, F; Arif, M and Sharp, M D (2015) New offsite production and business models in construction: Priorities for the future research agenda. Architectural Engineering and Design Management, 11(3), pp. 163-184. ISSN 1745-2007

Gradeci, K and Labonnote, N (2020) On the potential of integrating building information modelling (BIM) for the additive manufacturing (AM) of concrete structures. Construction Innovation, 20(3), pp. 321-343. ISSN 1471-4175

Graser, K; Kahlert, A and Hall, D M (2021) Dfab house: Implications of a building-scale demonstrator for adoption of digital fabrication in AEC. Construction Management and Economics, 39(10), pp. 853-873. ISSN 01446193

Graser, Konrad (2023) From invention to innovation: Socio-technical processes in the adoption of digital fabrication to architecture, engineering and construction praxis. PhD thesis, ETH Zürich, Switzerland.

Gravina da Rocha, C; Korb, S and Sacks, R (2022) Work structuring and product design for customized repetitive projects. Construction Management and Economics, 40(7-8), pp. 526-547. ISSN 01446193

Green, S D (2002) The human resource management implications of lean construction: critical perspectives and conceptual chasms. Journal of Construction Research, 3(1), pp. 147-165. ISSN 1609-9451

Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli. PhD thesis, University of Newcastle upon Tyne, UK.

Grosskopf, K R and Kibert, C J (2006) Economic incentive framework for sustainable energy use in us residential construction. Construction Management and Economics, 24(8), pp. 839-846. ISSN 1466433X

Gruneberg, S and Hughes, W P (2004) Construction consortia: Do they serve any real purpose? In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gschösser, F (2011) Environmental assessment of road constructions: Life cycle assessment of Swiss road pavements and an accompanying analysis of construction and maintenance costs. DSc thesis, ETH Zürich, Switzerland.

Guerrini, Fabio Muller (1999) A integrated model of management production for civil construction companies. PhD thesis, Universidade de São Paulo, Brazil.

Gupta, N K; Thakre, G D and Kumar, M (2020) Dry sliding wear performance on self-healing Al6061 composites. Journal of Engineering, Design and Technology, 18(5), pp. 1357-1370. ISSN 1726-0531

Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.

Hadi, A; Cheung, F; Adjei, S and Dulaimi, A (2023) Evaluation of lean off-site construction literature through the lens of industry 4.0 and 5.0. Journal of Construction Engineering and Management, 149(12): 03123007, ISSN 0733-9364

Hadjri, K (1992) The viability of 'no-fines' for the production of appropriate housing in Algeria. PhD thesis, CNAA, Oxford Polytechnic, UK.

Haghdadi, H (1989) The role of micro computers on the construction site. PhD thesis, Aston University, UK.

Haghighi, Z (2022) Architectural photovoltaic application. PhD thesis, Delft University of Technology, Netherlands.

Haglund, P; Rudberg, M and Sezer, A A (2022) Organizing logistics to achieve strategic fit in building contractors: A configurations approach. Construction Management and Economics, 40(9), pp. 711-726. ISSN 01446193

Hairstans, R (2007) Optimisation of timber platform frame construction. PhD thesis, Edinburgh Napier University, UK.

Hajjar, D and Abourizk, S M (1998) Modeling and analysis of aggregate production operations. Journal of Construction Engineering and Management, 124(5), pp. 390-401. ISSN 0733-9364

Hall, M A and Jaggar, D M (1998) The importance of cultural differences to British construction professionals working internationally. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.

Hallowell, M R; Hardison, D and Desvignes, M (2016) Information technology and safety: Integrating empirical safety risk data with building information modeling, sensing, and visualization technologies. Construction Innovation, 16(3), pp. 323-347. ISSN 1471-4175

Hamerski, D C; Formoso, C T and Isatto, E L (2025) Integrating lean production and agile project management: A planning and control model for multi-project environments in construction. International Journal of Construction Management, 25(12), pp. 1432-1441. ISSN 1562-3599

Hamid, Z A and Anuar Mohamad Kamar, K (2012) Aspects of off-site manufacturing application towards sustainable construction in Malaysia. Construction Innovation, 12(1), pp. 4-10. ISSN 1471-4175

Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.

Han, S (2024) Understanding of AI-aided reality capture data for the development of BIM modeling for building façade inspections. PhD thesis, Marquette University, USA.

Handa, V K and Barcia, R M (1986) Linear scheduling using optimal control theory. Journal of Construction Engineering and Management, 112(3), pp. 387-393. ISSN 0733-9364

Hansen, G K and Olsson, N O E (2011) Layered project-layered process: Lean thinking and flexible solutions. Architectural Engineering and Design Management, 7(2), pp. 70-84. ISSN 1745-2007

Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364

Hasanzadeh, S and De La Garza, J M (2020) Productivity-safety model: Debunking the myth of the productivity-safety divide through a mixed-reality residential roofing task. Journal of Construction Engineering and Management, 146(11): 04020124, ISSN 0733-9364

Hassan, A; Purnomo, M R A and Anugerah, A R (2020) Fuzzy-analytical-hierarchy process in failure mode and effect analysis (FMEA) to identify process failure in the warehouse of a cement industry. Journal of Engineering, Design and Technology, 18(2), pp. 378-388. ISSN 1726-0531

Hauenstein, A D (1966) Construction: A taxonomy and syllabus of production practices with implications for industrial arts. PhD thesis, Ohio State University, USA.

Henin, Eliya E A (2012) Efficient precast/prestressed floor system for building construction. PhD thesis, University of Nebraska - Lincoln, USA.

Henrich, G (2010) Development of a tool for diagnosing production management efficiency on construction sites. PhD thesis, University of Salford, UK.

Henriksen, T; Lo, S and Knaack, U (2016) The impact of a new mould system as part of a novel manufacturing process for complex geometry thin-walled gfrc. Architectural Engineering and Design Management, 12(3), pp. 231-249. ISSN 1745-2007

Hinze, J and Olbina, S (2009) Empirical analysis of the learning curve principle in prestressed concrete piles. Journal of Construction Engineering and Management, 135(5), pp. 425-431. ISSN 0733-9364

Hipwood, T (2022) Adapting owner-occupied dwellings in the UK: Lessons for the future. Buildings & Cities, 3(1), pp. 297-315. ISSN 2632-6655

Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains. PhD thesis, University of Washington, USA.

Ho Song, M and Fischer, M (2020) Empirical determination of the smallest batch sizes for daily planning. Journal of Construction Engineering and Management, 146(3): 04020011, ISSN 0733-9364

Holmes, Matthew Ian (2013) The application of structural contingency theory to supply chain management: Developing a strategic model for prefabricated timber systems. PhD thesis, University of Technology Sydney, Australia.

Hong, X (2002) A comparative study of contractor performance based on Japanese, UK and US construction practice. PhD thesis, University of Wolverhampton, UK.

Hong, Z; Hong, Y; Cai, H; Abraham, D M; Zhang, J and Dunston, P S (2025) BIM-based framework for in-plant quality control of precast concrete manufacturing. Journal of Construction Engineering and Management, 151(12): 05025017, ISSN 0733-9364

Hooko, D K (1999) The private urban residential development process in Tamale, Ghana: an application of structure and agency institutionalism. PhD thesis, University of Aberdeen, UK.

Horman, M J and Thomas, H R (2005) Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management, 131(7), pp. 834-843. ISSN 0733-9364

Horman, Michael J (2000) Process dynamics: Buffer management in building project operations. PhD thesis, University of Melbourne, Australia.

Horne, M; Hill, R and Giddings, R (1999) Visualization of photovoltaic clad buildings. Building Research & Information, 27(2), pp. 96-108. ISSN 0961-3218

Hovde, G O (1995) Fatigue and overload reliability of offshore structural systems, considering the effect of inspection and repair. DrIng thesis, Universitetet i Trondheim Norges Tekniske Hogskole, Norway.

Howe, A S (1998) A new paradigm for life-cycle management of kit-of-parts building systems. PhD thesis, University of Michigan, USA.

Howell, G A (2011) New operating system for project management: Consequences and opportunities. Journal of Construction Engineering and Management, 137, pp. 882-886. ISSN 0733-9364

Howell, G A; Ballard, G and Tommelein, I (2011) Construction engineering-reinvigorating the discipline. Journal of Construction Engineering and Management, 137, pp. 740-744. ISSN 0733-9364

Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.

Hu, D and Mohamed, Y (2014) Simulation-model-structuring methodology for industrial construction fabrication shops. Journal of Construction Engineering and Management, 140(5): 04014002, ISSN 0733-9364

Hu, H (2014) Development of interoperable data protocol for integrated bridge project delivery. PhD thesis, State University of New York at Buffalo, USA.

Hu, X and Chong, H Y (2022) Integrated frameworks of construction procurement systems for off-site manufacturing projects: Social network analysis. International Journal of Construction Management, 22(11), pp. 2089-2097. ISSN 1562-3599

Hu, X; Chong, H Y; Wang, X and London, K (2019) Understanding stakeholders in off-site manufacturing: A literature review. Journal of Construction Engineering and Management, 145(8): 03119003, ISSN 0733-9364

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.

Huang, K; Jia, G; Liu, D and Ma, Y (2018) The transformation mechanism of work-related stress into unsafe behaviour in construction industry: Based on DEA method. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Hyde, R (2023) An investigation into the relationship between technical design, fabrication process and material development for the production of thin, lightweight, high-performance concrete cladding components for the construction of beautiful, durable and resilient building envelopes. PhD thesis, Queen's University Belfast, UK.

Höök, M and Stehn, L (2008) Applicability of lean principles and practices in industrialized housing production. Construction Management and Economics, 26(10), pp. 1091-1100. ISSN 1466433X

Ibarra, G (2016) The meaning of 'social' in Mexican social housing: A study of housing developments in Mazatlán, Mexico. PhD thesis, University of Sheffield, UK.

Ibn Majdoub Hassani, Z; El Barkany, A; Jabri, A; El Abbassi, I and Darcherif, A M (2020) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology, 18(1), pp. 172-189. ISSN 1726-0531

Idoro, G I (2011) Effect of mechanisation on occupational health and safety performance in the Nigerian construction industry. Journal of Construction in Developing Countries, 16(2), pp. 27-45. ISSN 1823-6499

Ikuma, L H; Nahmens, I and James, J (2011) Use of safety and lean integrated kaizen to improve performance in modular homebuilding. Journal of Construction Engineering and Management, 137(7), pp. 551-560. ISSN 0733-9364

Ilgın, H E; Karjalainen, M and Pelsmakers, S (2022) Contemporary tall residential timber buildings: What are the main architectural and structural design considerations? International Journal of Building Pathology and Adaptation, 41(6), pp. 26-46. ISSN 23984708

Innella, F; Arashpour, M and Bai, Y (2019) Lean methodologies and techniques for modular construction: Chronological and critical review. Journal of Construction Engineering and Management, 145(12): 04019076, ISSN 0733-9364

Ioannou, P. G. and Liu, L. Y. (1993) Advanced construction technology system: Acts. Journal of Construction Engineering and Management, 119(2), pp. 288-306. ISSN 0733-9364

Ioannou, P G and Liu, L Y (1993) Advanced construction technology system: acts. Journal of Construction Engineering and Management, 119(2), pp. 288-306. ISSN 0733-9364

Ismail, F; Ruikar, K D; Carrillo, P and Anumba, C J (2009) Technology transfer in construction: Learning from the manufacturing industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Itoya, E (2012) Carbon emissions evaluation for highway management and maintenance. EngD thesis, Loughborough University, UK.

Jackson, F (2006) Biodegradable hydraulic fluids: Reducing oil-related pollution in the construction industry. PhD thesis, Nottingham Trent University, UK.

Jacobs, G F (2010) Review of lean construction conference proceedings and relationship to the Toyota production system framework. PhD thesis, Colorado State University, USA.

Jaenglom, Kamonmarn (2014) Exploring construction supply chain management: A systematic perspective for creating sustainable performance. PhD thesis, Università degli Studi di Bergamo, Italy.

Jaiganesh, V and Prakasan, K (2016) Comparison of flow behaviour in pressurized gating systems using water models and numerical simulation. Journal of Engineering, Design and Technology, 14(3), pp. 652-674.

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Jansson, G; Johnsson, H and Engström, D (2014) Platform use in systems building. Construction Management and Economics, 32(1-2), pp. 70-82. ISSN 01446193

Jansson, G; Söderholm, E and Johnsson, H (2008) Design process organisation at industrial house builders: A case study of two timber housing companies in Sweden. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Jayakrishna, K; Girubha, R J and Vinodh, S (2016) Comparison of sustainability characteristics of conventional and CNC turning processes: A case study. Journal of Engineering, Design and Technology, 14(3), pp. 422-445.

Jayaram, S (2009) Development of payload housing for temperature and pressure control of bio fuel cells for space applications. Journal of Engineering, Design and Technology, 7(3), pp. 323-334. ISSN 1726-0531

Jayaram, S (2010) Design of template to fabricate magnetic torquer coils for nano and picosatellite missions. Journal of Engineering, Design and Technology, 8(2), pp. 158-167. ISSN 1726-0531

Jayawardana, J; Sandanayake, M; Jayasinghe, J A S C; Kulatunga, A K and Zhang, G K (2025) Life cycle economic and social sustainability aspects of prefabricated construction: A systematic review towards the holistic sustainability. Construction Innovation, 25(7), pp. 98-138. ISSN 1471-4175

Jeong, J G (2006) A framework for supply chain modeling and optimization for the manufactured housing industry. PhD thesis, Purdue University, USA.

Ji, W and Abourizk, S M (2018) Data-driven simulation model for quality-induced rework cost estimation and control using absorbing Markov chains. Journal of Construction Engineering and Management, 144(8): 04018078, ISSN 0733-9364

Ji, Wenying (2018) Simulation-based analytics for fabrication quality-associated decision support. PhD thesis, University of Alberta, Canada.

Jiang, Z; Han, Y; Cheng, Y; Wang, Z and Meng, H (2025) An improved yolov8-dyhead-wiseiou model for positioning and counting detection of grouting sleeves in a prefabricated wall. Journal of Construction Engineering and Management, 151(4): 04025016, ISSN 0733-9364

Jiménez-Moreno, P (2020) Mass customisation for zero energy housing: the potential of Japanese manufacturing practices in the context of sustainable housebuilding in the United Kingdom. PhD thesis, University of Edinburgh, UK.

Jingmond, M and Ågren, R (2015) Unravelling causes of defects in construction. Construction Innovation, 15(2), pp. 198-218. ISSN 1471-4175

Johansen, D E and Greenwood, D J (1999) Hard, soft or lean? Planning on medium-sized construction projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Johansson, P; Linderoth, H C J and Granth, K (2014) The role of BIM in preventing design errors. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Johnson, B T (2007) Exploring the use of virtual construction to capture knowledge and reduce waste for residential projects. PhD thesis, Colorado State University, USA.

Johnsson, H (2013) Production strategies for pre-engineering in house-building: Exploring product development platforms. Construction Management and Economics, 31(9), pp. 941-958. ISSN 1466433X

Johnsson, H and Meiling, J H (2009) Defects in offsite construction: Timber module prefabrication. Construction Management and Economics, 27(7), pp. 667-681. ISSN 1466433X

Johnsson H, J G J P (2013) Modularization in a housing platform for mass customization. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Jones, B K (1998) A model for collaborative engineering the construction industry. PhD thesis, University of Southampton, UK.

Jones, Barry Kenneth (1998) A model for collaborative engineering in the construction industry. PhD thesis, University of Southampton, UK.

Jonsson, H (2018) Production strategy in project based production within a house-building context. PhD thesis, Linköping University, Sweden.

Jonsson, H and Rudberg, M (2014) Classification of production systems for industrialized building: A production strategy perspective. Construction Management and Economics, 32(1-2), pp. 53-69. ISSN 01446193

Jonsson, H and Rudberg, M (2015) Production system classification matrix: Matching product standardization and production-system design. Journal of Construction Engineering and Management, 141(6): 05015004, ISSN 0733-9364

Jonsson, H and Rudberg, M (2017) KPIs for measuring performance of production systems for residential building: A production strategy perspective. Construction Innovation, 17(3), pp. 381-403. ISSN 1471-4175

Ju C, R S (2013) Institutional determinants of construction safety management strategies of contractors in Hong Kong. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Jägbeck, A (1998) It support for construction planning: A system design based on integrated information. PhD thesis, KTH Royal Institute of Technology, Sweden.

Jørgensen, B and Emmitt, S (2008) Lost in transition: The transfer of lean manufacturing to construction. Engineering, Construction and Architectural Management, 15(4), pp. 383-398. ISSN 0969-9988

J⊘rgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a "lean" perspective. Construction Innovation, 9(2), pp. 225-240. ISSN 1471-4175

K'Akumu, O A (2010) The enabling environment for artisanal dimension stone in Nairobi, Kenya. PhD thesis, University of Westminster, UK.

K'Akumu, O A; Jones, B and Yang, J (2013) Factor analysis of the market environment for artisanal dimension stone in Nairobi, Kenya. Journal of Construction in Developing Countries, 18(2), pp. 15-32. ISSN 1823-6499

Kaboli, Alireza (2014) Cost and emissions analysis of earthmoving operations. PhD thesis, University of New South Wales, Australia.

Kagioglou, M (1999) Adapting manufacturing project processes into construction: a methodology. PhD thesis, University of Salford, UK.

Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.

Kanai, Júlia (2025) Systematic management model based on lean construction through a mobile app for industrialized buildings in the frame system. PhD thesis, Universidade Estadual de Campinas, Brazil.

Kaplinski, O (1993) Diminishing non-uniformity of construction processes. Construction Management and Economics, 11(1), pp. 53-61. ISSN 01446193

KaplińSki, O and Meszek, W (1992) Catastrophic and strategic aspects of building processes balancing. Construction Management and Economics, 10(1), pp. 81-88. ISSN 01446193

Karami, S (2008) Using by-product industrial materials to replace all cement in construction products. PhD thesis, Coventry University, UK.

Karhu, V (2001) A generic construction process modelling method. PhD thesis, KTH Royal Institute of Technology, Sweden.

Karim, K; Marosszeky, M and Davis, S (2006) Managing subcontractor supply chain for quality in construction. Engineering, Construction and Architectural Management, 13(1), pp. 27-42. ISSN 0969-9988

Karshenas, S (1989) Truck capacity selection for earthmoving. Journal of Construction Engineering and Management, 115(2), pp. 212-227. ISSN 0733-9364

Karsten Winther, J; Nielsen, R; Schultz, C and Teizer, J (2021) Automated activity and progress analysis based on non-monotonic reasoning of construction operations. Smart and Sustainable Built Environment, 10(3), pp. 457-486. ISSN 2046-6099

Karumanasseri, G and Abourizk, S (2002) Decision support system for scheduling steel fabrication projects. Journal of Construction Engineering and Management, 128(5), pp. 392-399. ISSN 0733-9364

Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175

Kashwani, G A (2017) Enhancing the implementation of safety engineering systems in oil and gas construction projects in the UAE. PhD thesis, Heriot-Watt University, UK.

Kašpar, H M P (2022) Robert Adam and networks for building in eighteenth-century Britain. PhD thesis, University of Leeds, UK.

Katoch, V and Mohan, S (2019) Design and fabrication of a safety frame for workers carrying out head lifting at construction sites. Journal of Engineering, Design and Technology, 17(6), pp. 1250-1265. ISSN 1726-0531

Kattein, J (2009) The architecture chronicle: Diary of an architectural practice. PhD thesis, University of London, University College London, UK.

Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.

Kawecki, L R (2010) Environmental performance of modular fabrication: Calculating the carbon footprint of energy used in the construction of a modular home. PhD thesis, Arizona State University, USA.

Kazaz, Billur (2022) Improvements in construction stormwater treatment using flocculants. PhD thesis, Auburn University, USA.

Ke, Y; Cheng, Z; Zhang, J and Liu, Y (2024) Making sense of the definition of public-private partnerships. Built Environment Project and Asset Management, 14(1), pp. 4-21. ISSN 2044-124X

Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.

Kehinde, J O and Mosaku, T O (2006) An empirical study of assets structure of building construction contractors in Nigeria. Engineering, Construction and Architectural Management, 13(6), pp. 634-644. ISSN 0969-9988

Kenley, R (2019) CME forum: A response to "construction flow index: A metric of production flow quality in construction". Construction Management and Economics, 37(2), pp. 112-119. ISSN 01446193

Kerali, A G and Thomas, T H (2002) Effect of mix retention and curing on low-cement walling blocks. Building Research & Information, 30(5), pp. 362-366. ISSN 0961-3218

Khalfan, M and Raja, N (2005) Improving construction process through integration and concurrent engineering. Construction Economics and Building, 5(1), pp. 58-66. ISSN 2204-9029

Khalfan, M M A; Anumba, C J and Carrillo, P M (2005) Concurrent engineering readiness assessment tool for construction. Architectural Engineering and Design Management, 1(3), pp. 163-179. ISSN 1745-2007

Khalili, A (2013) An IFC-based framework for optimizing level of prefabrication in industrialized building systems. PhD thesis, National University of Singapore, Singapore.

Khan, K I A (2016) Management of information complexity using system dynamics for small and medium-sized enterprises (SMEs) on construction projects. PhD thesis, University of Reading, UK.

Khan, K I A; Flanagan, R and Lu, S L (2015) Managing the complexity of information flow for construction small and medium-sized enterprises (csmes) using system dynamics and collaborative technologies. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Khan, K I A; Flanagan, R and Lu, S-L (2016) Managing information complexity using system dynamics on construction projects. Construction Management and Economics, 34(3), pp. 192-204. ISSN 0144-6193

Khanam, B R (2000) Contributions of highway capital to output, cost, and productivity growth: Evidence from the Canadian goods-producing sector. PhD thesis, York University, Canada.

Khanzode, A R (2011) An integrated virtual design and construction and lean (IVL) method for coordination of mechanical, electrical and plumbing (MEP) systems. PhD thesis, Stanford University, USA.

Khlaifat, D M; Alyagoub, R E; Sweis, R J and Sweis, G J (2019) Factors leading to construction projects' failure in Jordan. International Journal of Construction Management, 19(1), pp. 65-78. ISSN 1562-3599

Kifokeris, D (2021) Variants of Swedish lean construction practices reported in research: Systematic literature review and critical analysis. Journal of Construction Engineering and Management, 147(7), ISSN 0733-9364

Kifokeris, D; Bahnariu, B and Koch, C (2022) A mapping of Swedish lean construction variants in practice: Review and survey. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Kifokeris, D and Löwstedt, M (2021) Lost and found in translation: Top-down decoupling and bottom-up recoupling of strategies and practices in construction production. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Kim, Y W; Han, S; Shin, S and Choi, K (2011) A case study of activity-based costing in allocating rebar fabrication costs to projects. Construction Management and Economics, 29(5), pp. 449-461. ISSN 1466433X

Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2018) Estimation of optimal productivity in labor-intensive construction operations: Advanced study. Journal of Construction Engineering and Management, 144(10): 04018097, ISSN 0733-9364

Kittinaraporn, W; Tuprakay, S and Prasittisopin, L (2022) Effective modeling for construction activities of recycled aggregate concrete using artificial neural network. Journal of Construction Engineering and Management, 148(3): 04021206, ISSN 0733-9364

Klitgaard, A; Beck, F and Buhl, H (2018) Facilitation of interorganizational teams: An exploratory literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Ko, C H and Chung, N F (2014) Lean design process. Journal of Construction Engineering and Management, 140(6): 4014011, ISSN 0733-9364

Koch, C (2004) Operations management on the construction site: Developing a human resource and knowledge oriented alternative to lean construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Koch, C and Larsen, C S (2006) Quality in construction: A supply chain perspective. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Koch, C; Pedersen, T A and Fredslund, L (2024) Platforms of second-hand building material: A hub in the circular economy or fantasies of entrepreneurs? In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Korb, S and Sacks, R (2021) Agent-based simulation of general contractor-subcontractor interactions in a multiproject environment. Journal of Construction Engineering and Management, 147(1): 1944, ISSN 0733-9364

Kordestani Ghalenoei, N; Babaeian Jelodar, M; Paes, D and Sutrisna, M (2024) Challenges of offsite construction and BIM implementation: Providing a framework for integration in New Zealand. Smart and Sustainable Built Environment, 13(4), pp. 780-808. ISSN 2046-6099

Koskela, L (2003) Is structural change the primary solution to the problems of construction? Building Research & Information, 31(2), pp. 85-96. ISSN 0961-3218

Koskela, L and Ballard, G (2006) Should project management be based on theories of economics or production? Building Research & Information, 34(2), pp. 154-163. ISSN 0961-3218

Koskela, L; Ferrantelli, A; Niiranen, J; Pikas, E and Dave, B (2019) Epistemological explanation of lean construction. Journal of Construction Engineering and Management, 145(2): 04018131, ISSN 0733-9364

Koskela, L and Vrijhoef, R (2001) Is the current theory of construction a hindrance to innovation? Building Research & Information, 29(3), pp. 197-207. ISSN 0961-3218

Kucukvar, M (2013) Life cycle sustainability assessment framework for the U.S. Built environment. PhD thesis, University of Central Florida, USA.

Kumamoto, T; Kameda, H; Hoshiya, M and Ishii, K (1990) Construction of difficult dry dock in yokohama, Japan. Journal of Construction Engineering and Management, 116(2), pp. 201-220. ISSN 0733-9364

Kumar, S; Dhingra, A and Singh, B (2018) Lean-kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), pp. 143-160.

Kunz, J and Fischer, M (2020) Virtual design and construction. Construction Management and Economics, 38(4), pp. 355-363. ISSN 01446193

Kurul, E (2003) Re-using listed buildings through conversion: A process mapping approach. PhD thesis, University College London, UK.

Kuzmanovska, I (2020) Building design for manufacture and assembly (BDFMA): Reframing the design-production relationship in industrialised construction. PhD thesis, Monash University, Australia.

Labib, Y A M (2017) Lean framework for assessing construction logistics in Jordan. PhD thesis, University of Salford, UK.

Lam, T and Gale, K (2014) Highway maintenance: Impact of framework agreements upon project financial performance. Construction Management and Economics, 32(5), pp. 460-472. ISSN 01446193

Lang, R; Goodier, C and Glass, J (2016) Are housebuilders' production strategies a barrier to offsite construction uptake in the UK? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Laovisutthichai, V. and Lu, W. (2026) Design for excellence (dfx) in architecture, engineering, and construction: Definition, necessity, and knowledge management-based framework. Architectural Engineering and Design Management, 22(1), pp. 188-205. ISSN 1745-2007

Laovisutthichai, V and Lu, W (2023) Design for manufacture and assembly (dfma) in architectural design meetings: From a case study to knowledge-to-action framework. Smart and Sustainable Built Environment, 12(5), pp. 1117-1134. ISSN 2046-6099

Laovisutthichai, V; Lu, W and Low, S P (2025) Design for excellence (DfX) for high-rise modular buildings: from DfX considerations to module design guidelines using the case of Hong Kong. Architectural Engineering and Design Management, 21(3), pp. 430-449. ISSN 1745-2007

Lapinski, A R; Horman, M J and Riley, D R (2006) Lean processes for sustainable project delivery. Journal of Construction Engineering and Management, 132(10), pp. 1083-1091. ISSN 0733-9364

Larsson, J; Lu, W; Krantz, J and Olofsson, T (2016) Discrete event simulation analysis of product and process platforms: A bridge construction case study. Journal of Construction Engineering and Management, 142(4): 04015097, ISSN 0733-9364

Larsson, J and Simonsson, P (2012) Barriers and drivers for increased use of off-site bridge construction in Sweden. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.

Law, M.; Ninan, J.; Wamelink, H.; Jennen, P.; Meulstee, L. and van den Boom, I. (2026) Transition to timber construction: Project level socio-technical processes interpreted through a TIS framework perspective. Construction Management and Economics, 44(6), pp. 397-411. ISSN 0144-6193

Lawani, K; McKenzie-Govan, S; Hare, B; Sherratt, F and Cameron, I (2022) Skill shortage of bricklayers in Scotland. Journal of Engineering, Design and Technology, 20(1), pp. 321-338. ISSN 1726-0531

Lee, C; Won, J and Lee, E B (2018) Method for predicting raw material prices for product production over long periods. Journal of Construction Engineering and Management, 145(1): 05018017, ISSN 0733-9364

Lee, D; Lee, S G and Kim, S (2017) Composite phase-change material mold for cost-effective production of free-form concrete panels. Journal of Construction Engineering and Management, 143(6): 04017012, ISSN 0733-9364

Lee, D; Nie, G Y and Han, K (2024) Automatic and real-time joint tracking and three-dimensional scanning for a construction welding robot. Journal of Construction Engineering and Management, 150(3): 04023165, ISSN 0733-9364

Lee, G and Kim, S (2012) Case study of mass customization of double-curved metal façade panels using a new hybrid sheet metal processing technique. Journal of Construction Engineering and Management, 138(11), pp. 1322-1330. ISSN 0733-9364

Leghissa, G (2019) Collaboration between construction firms and the supply chain for the implementation of innovation strategies. PhD thesis, Loughborough University, UK.

Lei, Z; Chen, Q; Altaf, M S and Cao, K (2024) Defining information requirements for off-site construction management: An industry case study from Canada. Journal of Construction Engineering and Management, 150(12): 05024014, ISSN 0733-9364

Lekan, A; Aigbavboa, C and Emetere, M (2023) Managing quality control systems in intelligence production and manufacturing in contemporary time. International Journal of Construction Management, 23(8), pp. 1436-1446. ISSN 1562-3599

Lennartsson, M; André, S and Elgh, F (2023) Plm support for design platforms in industrialized house-building. Construction Innovation, 23(2), pp. 265-286. ISSN 1471-4175

Lennartsson, M and Bäckstrand, J (2018) Getting the most out of a collaborative research project: Cross industry design for a holistic view and increased learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.

Leslie-Carter, R; Zou, P X W and Tan, E X (2009) Managing international projects: A case study of the water cube aquatic centre for Beijing 2008 olympic games. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Lessing, J; Stehn, L and Ekholm, A (2015) Industrialised house-building: Development and conceptual orientation of the field. Construction Innovation, 15(3), pp. 378-399. ISSN 1471-4175

Levander, E and Sardén, Y (2009) Maintenance and operating costs in off-site timber framed housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Li, Z and Mok Paik, S (2025) Resource cost optimization strategies in off-site manufacturing for modern construction methods: A lean theory perspective case study in Ireland. International Journal of Construction Management, 25(16), pp. 1892-1900. ISSN 1562-3599

Li, H; Arditi, D and Wang, Z (2013) Factors that affect transaction costs in construction projects. Journal of Construction Engineering and Management, 139(1), pp. 60-68. ISSN 0733-9364

Li, H; Guo, H; Skibniewski, M J and Skitmore, M (2008) Using the IKEA model and virtual prototyping technology to improve construction process management. Construction Management and Economics, 26(9), pp. 991-1000. ISSN 1466433X

Li, H; Guo, H L; Li, Y and Skitmore, M (2012) From IKEA model to the lean construction concept: A solution to implementation. International Journal of Construction Management, 12(4), pp. 47-63. ISSN 1562-3599

Li, Liancheng (2025) Towards sustainable recovery of waste plastics with the Australian construction industry: Transition scenarios and environmental impact evaluation. PhD thesis, University of Adelaide, Australia.

Li, M (2024) Dfma-oriented rebar design optimization for reinforced concrete structures using graph neural network. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Li, Q; Yang, Y; Yao, G; Wei, F; Xue, G and Qin, H (2024) Multiobject real-time automatic detection method for production quality control of prefabricated laminated slabs. Journal of Construction Engineering and Management, 150(3): 05023017, ISSN 0733-9364

Li, Shuyang (2020) Proactive design approaches for energy-efficient buildings. PhD thesis, University of California, USA.

Li, Y (2013) Developing a sustainable construction waste estimation and management system. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.

Liang, Y and Xu, Z (2025) Intelligent inspection of appearance quality for precast concrete components based on improved YOLO model and multi-source data. Engineering, Construction and Architectural Management, 32(3), pp. 1691-1714. ISSN 0969-9988

Lienhard, J and Eversmann, P (2021) New hybrids–from textile logics towards tailored material behaviour. Architectural Engineering and Design Management, 17(3-4), pp. 169-174. ISSN 1745-2007

Lindhard, S (2014) Understanding the effect of variation in a production system. Journal of Construction Engineering and Management, 140(11): 4014051, ISSN 0733-9364

Ling, F Y Y; Chan, S L; Chong, E and Ee, L P (2004) Predicting performance of design-build and design-bid-build projects. Journal of Construction Engineering and Management, 130(1), pp. 75-83. ISSN 0733-9364

Lingard, H; Raj, I S; Lythgo, N; Troynikov, O and Fitzgerald, C (2019) The impact of tool selection on back and wrist injury risk in tying steel reinforcement bars: A single case experiment. Construction Economics and Building, 19(1), pp. 1-19. ISSN 2204-9029

Linner, T and Bock, T (2012) Evolution of large-scale industrialisation and service innovation in Japanese prefabrication industry. Construction Innovation, 12(2), pp. 156-178. ISSN 1471-4175

Liu, Z and Wang, N (2026) The effects of emerging digital technologies on construction project resilience: The mediating role of relational governance. Building Research & Information, 54(1), pp. 118-134. ISSN 0961-3218

Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G and Zou, Y (2024) Understanding social interaction and physiological patterns in nonlean and Last Planner system-based project teams: A comparative study using immersive virtual reality. Journal of Construction Engineering and Management, 150(10): 04024131, ISSN 0733-9364

Liu, G; Nzige, J H and Li, K (2019) Trending topics and themes in offsite construction(OSC) research: The application of topic modelling. Construction Innovation, 19(3), pp. 343-366. ISSN 1471-4175

Liu, H; Zhang, F; Ma, R; Wang, L; Chen, Z; Zhang, Q and Guo, L (2024) Intelligent noncontact structural displacement detection method based on computer vision and deep learning. Journal of Construction Engineering and Management, 150(10): 04024127, ISSN 0733-9364

Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364

Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, Q (2025) The impact of funnel sales management on sales performance in engineering construction companies: An empirical study based on CE company data. DBA thesis, Arizona State University, USA.

Liu, Q; Ye, G and Feng, Y (2020) Workers' safety behaviors in the off-site manufacturing plant. Engineering, Construction and Architectural Management, 27(3), pp. 765-784. ISSN 0969-9988

Liu, Y; Zhao, J; Dimitrov, V; Irish, A; Jones, C; Kirk, S; Thomas, J and Welter, D (2010) An entertaining robot prototype for pets. Journal of Engineering, Design and Technology, 8(2), pp. 189-205. ISSN 1726-0531

Loganathan, S; Forsythe, P and Kalidindi, S N (2018) Work practices of onsite construction crews and their influence on productivity. Construction Economics and Building, 18(3), pp. 18-39. ISSN 2204-9029

Loganathan, Santhosh (2023) A framework for analysing the influence of teamwork processes of onsite construction trade crews on productivity. PhD thesis, University of Technology Sydney, Australia.

Lohne, J; Torp, O; Andersen, B; Aslesen, S; Bygballe, L; Bølviken, T; Drevland, F; Engebø, A; Fosse, R; Holm, H T; Hunn, L K; Kalsaas, B T; Klakegg, O J; Knotten, V; Kristensen, K H; Olsson, N O E; Rolstadås, A; Skaar, J; Svalestuen, F; Vaagen, H; Wondimu, P and Laedre, O (2022) The emergence of lean construction in the Norwegian AEC industry. Construction Management and Economics, 40(7-8), pp. 585-597. ISSN 01446193

Lomas, K J (2009) Decarbonizing national housing stocks: Strategies, barriers and measurement. Building Research & Information, 37(2), pp. 187-191. ISSN 0961-3218

Loosemore, M (1995) Reactive management: Communication and behavioural issues in dealing with the occurrence of client risks. Construction Management and Economics, 13(1), pp. 65-80. ISSN 01446193

Lounsbury, C R (1983) From craft to industry: The building process in North Carolina in the nineteenth century. PhD thesis, George Washington University, USA.

Low, S P and Gao, S (2011) The application of the just-in-time philosophy in the Chinese construction industry. Journal of Construction in Developing Countries, 16(1), pp. 91-111. ISSN 1823-6499

Lowe, R (2007) Technical options and strategies for decarbonizing UK housing. Building Research & Information, 35(4), pp. 412-425. ISSN 0961-3218

Loy, W. W.; Belek Fialho Teixeira, M. and Franzè, A. P. (2026) Ar-guided modular robotic bricklaying: A proof-of-concept system for human-in-the-loop construction workflows. Construction Innovation, ISSN 1471-4175

Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.

Lu, M; Anson, M; Tang, S L and Ying, Y C (2003) Hkconsim: A practical simulation solution to planning concrete plant operations in Hong Kong. Journal of Construction Engineering and Management, 129(5), pp. 547-554. ISSN 0733-9364

Lu, M; Poon, C S and Wong, L C (2006) Application framework for mapping and simulation of waste handling processes in construction. Journal of Construction Engineering and Management, 132(11), pp. 1212-1221. ISSN 0733-9364

Lu, W; Olofsson, T and Stehn, L (2011) A lean-agile model of homebuilders' production systems. Construction Management and Economics, 29(1), pp. 25-35. ISSN 1466433X

Lu, W; Tan, T; Xu, J; Wang, J; Chen, K; Gao, S and Xue, F (2021) Design for manufacture and assembly (DfMA) in construction: The old and the new. Architectural Engineering and Design Management, 17(1-2), pp. 77-91. ISSN 1745-2007

Lucko, G; Araújo, L G and Cates, G R (2016) Slip chart-inspired project schedule diagramming: Origins, buffers, and extension to linear schedules. Journal of Construction Engineering and Management, 142(5): 04015101, ISSN 0733-9364

Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(2), pp. 127-136. ISSN 0969-9988

Lundkvist, R (2015) Experience feedback in industrialised house-building: The impact of production strategies. PhD thesis, Luleå University of Technology, Sweden.

Lundkvist, R; Meiling, J and Vennström, A (2010) Digitalization of inspection data: A means for enhancing learning and continuous improvements? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Luo, L Z; Mao, C; Shen, L Y and Li, Z D (2015) Risk factors affecting practitioners' attitudes toward the implementation of an industrialized building system a case study from China. Engineering, Construction and Architectural Management, 22(6), pp. 622-643. ISSN 0969-9988

Luo, Y (2008) Decision support for prefabrication strategy selection on building systems. PhD thesis, Pennsylvania State University, USA.

Lynch, T D (1996) A transaction cost framework for evaluating construction project organizations. PhD thesis, Pennsylvania State University, USA.

Löfgren, A (2005) Socio-technical management of collaborative mobile computing in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Löwstedt, M and Sandberg, R (2020) Standardizing the free and independent professional: The case of construction site managers in Sweden. Engineering, Construction and Architectural Management, 27(6), pp. 1337-1355. ISSN 0969-9988

M.E. Sepasgozar, S; Shirowzhan, S and Loosemore, M (2021) Information asymmetries between vendors and customers in the advanced construction technology diffusion process. Construction Innovation, 21(4), pp. 857-874. ISSN 1471-4175

Ma, X; Chan, A P C; Wu, H; Xiong, F and Dong, N (2018) Achieving leanness with BIM-based integrated data management in a built environment project. Construction Innovation, 18(4), pp. 469-487. ISSN 1471-4175

Machline, E; Pearlmutter, D; Cohen, C and Schwartz, M (2023) COVID-19: A catalyst for revitalizing mixed-use urban centers? The case of Paris. Building Research & Information, 51(1), pp. 39-55. ISSN 0961-3218

Madson, K M; Franz, B; Molenaar, K R and Okudan Kremer, G (2020) Strategic development of flexible manufacturing facilities. Engineering, Construction and Architectural Management, 27(6), pp. 1299-1314. ISSN 0969-9988

Madunic, M (2008) Choosing a project team: The effects of interdependence and prior transacting in engineering, procurement and construction (EPC) projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Mahdizadeh, H and Nor Mariah, A (2021) Numerical study of heat transfer in 90° bend tube by ai<sub>2</sub>o<sub>3</sub> nano fluids using fluid injection. Journal of Engineering, Design and Technology, 19(1), pp. 127-148. ISSN 1726-0531

Mahmood, A and Abrishami, S (2020) BIM for lean building surveying services. Construction Innovation, 20(3), pp. 447-470. ISSN 1471-4175

Majumdar, T (2024) Pmc: A classification of production metrics found useful by AEC professionals. PhD thesis, Stanford University, USA.

Maloney, W F (2002) Construction product/service and customer satisfaction. Journal of Construction Engineering and Management, 128(6), pp. 522-529. ISSN 0733-9364

Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.

Manley, K and Marceau, J (2002) Integrated manufacturing-services businesses in the Australian building and construction sector. Construction Economics and Building, 2(1), pp. 1-12. ISSN 2204-9029

Manrique Delgado, B; Cao, S; Hasan, A and Sirén, K (2018) Energy and exergy analysis of prosumers in hybrid energy grids. Building Research & Information, 46(6), pp. 668-685. ISSN 0961-3218

Mao, X and Zhang, X (2008) Construction process reengineering by integrating lean principles and computer simulation techniques. Journal of Construction Engineering and Management, 134(5), pp. 371-381. ISSN 0733-9364

Marey Madi, H A (2024) Sustainability assessment of using green concrete materials for residential buildings in Egypt. PhD thesis, Debreceni Egyetem, Hungary.

Marston, V K (1985) Interdependence of the functional element costs of buildings. PhD thesis, University of Portsmouth, UK.

Matsuzaki, M; Uchikawa, C and Mitamura, T (1990) Advanced fabrication and erection techniques for long suspension bridge cables. Journal of Construction Engineering and Management, 116(1), pp. 112-129. ISSN 0733-9364

Mayer, Z and Kazakidis, V (2007) Decision making in flexible mine production system design using real options. Journal of Construction Engineering and Management, 133(2), pp. 169-180. ISSN 0733-9364

Maytorena Sanchez, Eunice S (2003) Building conversion process: a cognitive exploration. PhD thesis, University College London, UK.

Mbaye, M H (2023) Effective working capital management practice and SMEs' financial performance: the case of SMEs operating in the service and construction sectors in Senegal. DBA thesis, University of Wales Trinity Saint David, UK.

Mbiti, Titus (2008) System dynamics model of construction output in Kenya. PhD thesis, RMIT University, Australia.

McCabe, S; Crook, D; Rooke, J and Seymour, D (1997) Construction's experiences of attempting to become world class: The role of academics in assisting practitioners. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

McCauley, Kathleen H (2020) Modeling construction management dynamics: A proxy estimation of percent planned complete. PhD thesis, Indiana State University, USA.

McGrath-Champ, S and Rosewarne, S (2009) Organizational change in Australian building and construction: Rethinking a unilinear 'leaning' discourse. Construction Management and Economics, 27(11), pp. 1111-1128. ISSN 1466433X

McKay, L J; Gibb, A G F; Haslam, R and Pendlebury, M (2002) Implications for the effect of standardization and pre-assembly on health, safety and accident causality: Preliminary results. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

McKay, L J; Gibb, A G F; Haslam, R and Pendlebury, M (2003) The development of an accident causal model for off-site production in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

McLeod, J S (2000) Planning for startup: An evaluation of factors affecting the startup of process industry facilities. PhD thesis, University of Texas at Austin, USA.

Meacham, B J (2022) Fire performance and regulatory considerations with modern methods of construction. Buildings & Cities, 3(1), pp. 464-487. ISSN 2632-6655

Mecca, S and Masera, M (1999) Technical risk analysis in construction by means of fmea methodology. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364

Meiling, J (2010) Continuous improvement and experience feedback in off-site construction timber-framed module prefabrication. PhD thesis, Luleå University of Technology, Sweden.

Meiling, J; Backlund, F and Johnsson, H (2012) Managing for continuous improvement in off-site construction: Evaluation of lean management principles. Engineering, Construction and Architectural Management, 19(2), pp. 141-158. ISSN 0969-9988

Meiling, J and Johnsson, H (2008) Feedback in industrialised housing: Why does it not happen? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Meiling, J and Sandberg, M (2009) Towards a feedback model for offsite construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Memarian, B and Mitropoulos, P (2014) Production system design for speed and reliability: A case study in concrete construction. International Journal of Construction Education and Research, 10(3), pp. 181-200. ISSN 1557-8771

Meng, Y (2023) Multi-objective optimal design and assessment framework of freeform timber structure oriented by robotic automation construction. PhD thesis, University of Sheffield, UK.

Micelli, E (2000) Mobilizing the skills of specialist firms to reduce costs and enhance performance in the European construction industry: Two case studies. Construction Management and Economics, 18(6), pp. 651-656. ISSN 01446193

Milani, B (2005) Building materials in a green economy: Community-based strategies for dematerialization. PhD thesis, University of Toronto, Canada.

Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451

Mimendi Cruz, Jose Leonel (2021) Digital workflow for the design, construction and management of natural bamboo pole structures. PhD thesis, University College London, UK.

Mitropoulos, P; Abdelhamid, T S and Howell, G A (2005) Systems model of construction accident causation. Journal of Construction Engineering and Management, 131(7), pp. 816-825. ISSN 0733-9364

Mitropoulos, P; Cupido, G and Namboodiri, M (2009) Cognitive approach to construction safety: Task demand-capability model. Journal of Construction Engineering and Management, 135(9), pp. 881-889. ISSN 0733-9364

Modeen, T; Pasquire, C and Soar, R (2005) Ubiquitous customization: Utilizing rapid manufacturing in the production of design and architecture. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Moghadam, M (2014) Lean-mod: An approach to modular construction manufacturing production efficiency improvement. PhD thesis, University of Alberta, Canada.

Mohamed, T and Karima, A (2018) Architectural quality through the integration of users' viewpoints in architectural design: Case study Pouillon's Diar es Saada. Journal of Construction in Developing Countries, 23(1), pp. 149-175. ISSN 1823-6499

Mohareb, E; Gillich, A and Bristow, D (2022) Participation in domestic energy retrofit programmes: Key spatio-temporal drivers. Buildings & Cities, 3(1), pp. 356-375. ISSN 2632-6655

Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364

Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.

Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.

Mokhtar, A H M (1998) An information model for managing design changes in a collaborative multidisciplinary design environment. PhD thesis, Concordia University, Canada.

Montali, J (2019) Digitised engineering knowledge for prefabricated fac?ades. PhD thesis, University of Cambridge, UK.

Montali, J; Overend, M; Pelken, P M and Sauchelli, M (2018) Knowledge-based engineering in the design for manufacture of prefabricated façades: Current gaps and future trends. Architectural Engineering and Design Management, 14(1-2), pp. 78-94. ISSN 1745-2007

Monteiro, Nathalie Barbosa Reis (2021) Life cycle management: Foundations for the application of circular economy in concrete industries of civil construction. PhD thesis, Universidade Federal do Piauí, Brazil.

Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.

Moore, D (1996) The renaissance: The beginning of the end for implicit buildability. Building Research & Information, 24(5), pp. 259-269. ISSN 0961-3218

Moore, D R (1997) An analysis of experimental data to determine the validity of aspects of tolerance requirement general theory. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180

Moore, T A and Moore, D R (1997) Project management for the construction industry: An examination of a systems approach. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Morland, K V (2020) Multi-level learning of a quality management routine: a UK housebuilder case study. PhD thesis, University of Sheffield, UK.

Mosaner, Fabio Ferreira Lins (2021) Design and process in architectural production: João filgueiras lima (lelé) and the centro de tecnologia da rede sarah (ctrs). PhD thesis, Universidade de São Paulo, Brazil.

Mossman, A and Sarhan, S (2021) Synchronising off-site fabrication with on-site production in construction. Construction Economics and Building, 21(3), pp. 122-141. ISSN 2204-9029

Mostafa, S and Chileshe, N (2018) Application of discrete-event simulation to investigate effects of client order behaviour on off-site manufacturing performance in Australia. Architectural Engineering and Design Management, 14(1-2), pp. 139-157. ISSN 1745-2007

Mostafa, S; Kim, K P; Tam, V W Y and Rahnamayiezekavat, P (2020) Exploring the status, benefits, barriers and opportunities of using BIM for advancing prefabrication practice. International Journal of Construction Management, 20(2), pp. 146-156. ISSN 1562-3599

Mostafa, S; Tam, V W; Dumrak, J and Mohamed, S (2020) Leagile strategies for optimizing the delivery of prefabricated house building projects. International Journal of Construction Management, 20(8), pp. 867-881. ISSN 1562-3599

Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.

Mrazovic, N and Fischer, M (2022) Assessment framework for additive manufacturing in the AEC industry. Journal of Construction Engineering and Management, 148(5): 04022013, ISSN 0733-9364

Msomi, V and Oliver, G J (2016) Smart morphing based on shape memory alloy plate. Journal of Engineering, Design and Technology, 14(3), pp. 475-488.

Mucheti, A S and Albuquerque, P J R D (2022) Influence of execution speed on displacements of soil-nailed structures with vertical face in urban areas. Journal of Construction Engineering and Management, 148(7): 04022048, ISSN 0733-9364

Mucheti, Alexsander Silva (2025) Experimental and numerical analysis of nailed soil structures in urban areas. PhD thesis, Universidade Estadual de Campinas, Brazil.

Mungodla, S G; Linganiso, L Z; Mlambo, S and Motaung, T (2019) Economic and technical feasibility studies: Technologies for second generation biofuels. Journal of Engineering, Design and Technology, 17(4), pp. 670-704. ISSN 1726-0531

Murtaza, M B (1993) A decision support model integrating neural networks and an expert system for construction modularization. PhD thesis, University of Houston, USA.

Mustapha, K; Alhiyafi, J; Shafi, A and Olatunji, S O (2023) Support vector machines for predicting the compressive response of defected 3D printed polymeric sandwich structures. Journal of Engineering, Design and Technology, 21(3), pp. 819-839. ISSN 1726-0531

Muthelo, R G (2022) An integrated decision-making model for evaluating public sector construction bids. PhD thesis, University of Johannesburg, South Africa.

Mándoki, R (2022) The social sustainability of standardisation in the Hungarian residential building sector. PhD thesis, University of Cambridge, UK.

Mándoki, R and Orr, J (2023) The social acceptance of mass produced residential buildings among Hungarian young adults. Architectural Engineering and Design Management, 19(2), pp. 148-162. ISSN 1745-2007

Nadi, E (2019) Construction labor productivity benchmarking: A comparison between on-site construction and prefabrication. PhD thesis, Marquette University, USA.

Nahmens, I and Bindroo, V (2011) Is customization fruitful in industrialized homebuilding industry? Journal of Construction Engineering and Management, 137(12), pp. 1027-1035. ISSN 0733-9364

Nahmens, I and Mullens, M (2009) The impact of product choice on lean homebuilding. Construction Innovation, 9(1), pp. 84-100. ISSN 1471-4175

Najjar, M K; Figueiredo, K; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Life cycle assessment methodology integrated with BIM as a decision-making tool at early-stages of building design. International Journal of Construction Management, 22(4), pp. 541-555. ISSN 1562-3599

Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Naumets, S and Lu, M (2021) Investigation into explainable regression trees for construction engineering applications. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364

Nayfeh, M (1989) A combination of cyclone and vert techniques for the management of construction projects. PhD thesis, Aston University, UK.

Neamat, S D; Haido, J H and Wardeh, G (2025) Investigating pozzolanic glass waste's role in reinforcing ultra-high-performance concrete beams for enhanced sustainability. International Journal of Building Pathology and Adaptation, 43(4), pp. 633-651. ISSN 2398-4708

Neuman, Y; Alves, T D C L; Walsh, K D and Needy, K L (2015) Quantitative analysis of supplier quality surveillance practices in EPC projects. Journal of Construction Engineering and Management, 141(11): 04015039, ISSN 0733-9364

Ng, Ming Shan (2022) Design for digital fabrication (dfdfab): Management for sustainable adoption of emerging technologies and innovations. PhD thesis, ETH Zürich, Switzerland.

Ng, S T; Zheng, D X M and Xie, J Z (2013) Allocation of construction resources through a pull-driven approach. Construction Innovation, 13(1), pp. 77-97. ISSN 1471-4175

Nguyen, T; Elelu, K; Le, T and Le, C (2026) Enhancing auditory safety warnings in highway construction zones with loud noise using generative artificial intelligence. Journal of Construction Engineering and Management, 152(3): 04025283, ISSN 0733-9364

Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.

Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity a case of structural work. Engineering, Construction and Architectural Management, 20(6), pp. 563-575. ISSN 0969-9988

Nilsson, S (2003) Durability of district heating pipes. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Niskanen, T (1993) Accident risks and preventive measures in materials handling at construction sites. DrTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Noguchi, M (2004) A choice model for mass customisation of lower-cost and higher-performance housing in sustainable development. PhD thesis, McGill University, Canada.

Noriega, M S; Valles, C A; Torres-Argüelles, V; Martínez, G E and Hernández, G A (2016) Six sigma improvement project in a concrete block plant. Construction Innovation, 16(4), pp. 526-544. ISSN 1471-4175

Novotny, V (2013) Water-energy nexus: Retrofitting urban areas to achieve zero pollution. Building Research & Information, 41(5), pp. 589-604. ISSN 0961-3218

O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175

O'Connor, J T; O'Brien, W J and Choi, J O (2014) Critical success factors and enablers for optimum and maximum industrial modularization. Journal of Construction Engineering and Management, 140(6): 4014012, ISSN 0733-9364

O'Connor, J T; O'Brien, W J and Choi, J O (2015) Standardization strategy for modular industrial plants. Journal of Construction Engineering and Management, 141(9): 4015026, ISSN 0733-9364

Ofori-Kuragu, J K and Osei-Kyei, R (2021) Mainstreaming pre-manufactured offsite processes in construction: are we nearly there? Construction Innovation, 21(4), pp. 743-760. ISSN 1471-4175

Ogunnusi, M; Salman, H and Laing, R (2023) TOPSIS analysis for sustainable redevelopment potential of abandoned infrastructure in Nigeria. Built Environment Project and Asset Management, 13(1), pp. 73-88. ISSN 2044-124X

Ogunsemi, D R and Aje, I O (2006) A model for contractors' selection in Nigeria. Journal of Financial Management of Property and Construction, 11(1), pp. 33-44. ISSN 1366-4387

Oladimeji, O (2022) Influence of COVID-19 pandemic on local construction firms' viability. Journal of Engineering, Design and Technology, 20(1), pp. 201-221. ISSN 1726-0531

Olbina, S and Glick, S (2023) Using integrated hands-on and virtual reality (VR) or augmented reality (AR) approaches in construction management education. International Journal of Construction Education and Research, 19(3), pp. 341-360. ISSN 1557-8771

Olimat, H.; Abudayyeh, O.; Liu, H. and Alwashah, Z. (2026) Safety performance evaluation model for off-site construction through the integration of key leading and lagging factors. Journal of Construction Engineering and Management, 152(6): 04026077, ISSN 0733-9364

Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.

Oloke, D; Edwards, D J; Wright, B and Love, P E D (2006) A web-based information management system for predicting the breakdown of off-highway plant. Journal of Engineering, Design and Technology, 4(1), pp. 29-45. ISSN 1726-0531

Omotayo, T S (2017) Strategic realignment of the post-contract cost control process in the Nigerian construction industry using kaizen. PhD thesis, University of Salford, UK.

Ong, J (2019) Enabling lean through using shared mental models for precast construction in Singapore. PhD thesis, National University of Singapore, Singapore.

Onitiri, M A and Adedayo, S M (2015) Compressive behaviour of polypropylene filled with iron ore tailings. Journal of Engineering, Design and Technology, 13(2), pp. 198-212.

Opoku, A; Cruickshank, H; Guthrie, P and Georgiadou, M C (2014) Stakeholder engagement in research: The case of retrofit 2050 research project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Oral, E L and Mstkolu, G (2000) Current state of Turkish prefabrication companies with respect to the applicability of just in time. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Orstavik, F (2018) Negotiating and knowing built quality. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Oti-Sarpong, K; Pärn, E A; Burgess, G and Zaki, M (2022) Transforming the construction sector: An institutional complexity perspective. Construction Innovation, 22(2), pp. 361-387. ISSN 1471-4175

Oviedo Haito, Ricardo Juan José (2015) Strategies to develop specialist trade contractors. PhD thesis, Universidade de São Paulo, Brazil.

O’Connor, J T and Davis, V S (1988) Constructability improvement during field operations. Journal of Construction Engineering and Management, 114(4), pp. 548-564. ISSN 0733-9364

O’Connor, J T; Rusch, S E and Schulz, M J (1987) Constructability concepts for engineering and procurement. Journal of Construction Engineering and Management, 113(2), pp. 235-248. ISSN 0733-9364

Pablo, Z; London, K; Wong, P S P and Khalfan, M (2021) Actor-network theory and the evolution of complex adaptive supply networks. Construction Innovation, 21(4), pp. 668-684. ISSN 1471-4175

Palencia, M; Mora, M and Lerma, T A (2021) Environment-friendly stimulus-sensitive polyurethanes based on cationic aminoglycosides for the controlled release of phytohormones. Smart and Sustainable Built Environment, 10(1), pp. 1-17. ISSN 2046-6099

Pan, X.; Ma, G.; Zhang, Y. and Ke, J. (2026) How voluntary sustainable effort influences task performance of construction project members: Insights from agent-based simulation. Engineering, Construction and Architectural Management, pp. 1-29. ISSN 0969-9988

Pan, W and Arif, M (2011) Manufactured construction: Revisiting the construction-manufacturing relations. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Pan, W; Dainty, A R J and Gibb, A G F (2004) Managing innovation: A focus on off-site production (OSP) in the UK housebuilding industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Pan, W; Dainty, A R J and Gibb, A G F (2012) Establishing and weighting decision criteria for building system selection in housing construction. Journal of Construction Engineering and Management, 138(11), pp. 1239-1250. ISSN 0733-9364

Pan, W; Gibb, A G F and Dainty, A R J (2012) Strategies for integrating the use of off-site production technologies in house building. Journal of Construction Engineering and Management, 138(11), pp. 1331-1340. ISSN 0733-9364

Panas, A and Pantouvakis, J P (2014) Simulation-based and statistical analysis of the learning effect in floating caisson construction operations. Journal of Construction Engineering and Management, 140(1): 04013033, ISSN 0733-9364

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Parisi, F; Sangiorgio, V; Parisi, N; Mangini, A M; Fanti, M P and Adam, J M (2024) A new concept for large additive manufacturing in construction: Tower crane-based 3D printing controlled by deep reinforcement learning. Construction Innovation, 24(1), pp. 8-32. ISSN 1471-4175

Parisi, Fabio (2023) Automation and information approaches to support maintenance and production management in the construction industry. PhD thesis, Politecnico di Bari, Italy.

Pasquire, C (2012) Positioning lean within an exploration of engineering construction. Construction Management and Economics, 30(8), pp. 673-685. ISSN 1466433X

Pasquire, C; Ballard, G; Zimina, D and Pasquire, C L (2011) Applying lean thinking in commercial management. Journal of Financial Management of Property and Construction, 16(1), pp. 64-72. ISSN 1366-4387

Pasquire, C and Salvatierra-Garrido, J (2011) Introducing the concept of first and last value to aid lean design: Learning from social housing projects in Chile. Architectural Engineering and Design Management, 7(2), pp. 128-138. ISSN 1745-2007

Payne, S L (2009) The institutional capacity of the UK speculative housebuilding industry – responding to the brownfield development policy agenda. PhD thesis, University of Glasgow, UK.

Pellicer, E; Yepes, V; Correa, C L and Alarcón, L F (2014) Model for systematic innovation in construction companies. Journal of Construction Engineering and Management, 140(4): B4014001, ISSN 0733-9364

Peltokorpi, A; Olivieri, H; Granja, A D and Seppänen, O (2018) Categorizing modularization strategies to achieve various objectives of building investments. Construction Management and Economics, 36(1), pp. 32-48. ISSN 01446193

Pereira, Ana Paula Carvalho (2017) Building information modeling in the project phase: A proposal for a BIM execution plan for SUMAI / UFBA. PhD thesis, Universidade Federal da Bahia, Brazil.

Pham, L T; Nguyen, T; Trinh, T; Nguyen, A; Do, Q; Bui, B and Xiao, J (2023) Development of 3D printers for concrete structures: Mix proportion design approach and laboratory testing. Smart and Sustainable Built Environment, 12(5), pp. 1056-1073. ISSN 2046-6099

Phelps, A F (2008) Lean information flow in complex healthcare projects and the role of the “integrator” as information flow manager. PhD thesis, Pennsylvania State University, USA.

Pheng, L S and Fong, E T W (2002) Preparations for ISO 9001:2000: a study of ISO 9000:1994 certified construction firms. Construction Management and Economics, 20(5), pp. 403-413. ISSN 01446193

Pheng, L S and Hui, M S (1999) The application of JIT philosophy to construction: A case study in site layout. Construction Management and Economics, 17(5), pp. 657-668. ISSN 01446193

Phrommarat, B and Arromdee, P (2022) A life cycle assessment study of pre-stressed concrete poles in Thailand. International Journal of Construction Management, 22(6), pp. 1053-1064. ISSN 1562-3599

Pinfold, L (2018) Coupling innovative technology, space management and BIM processes with smart city management: Congested construction sites in urban centres in Cape Town South Africa. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Pirooz Far Poorang, A E (2008) Mass-constomisation: The application on design, fabrication and implementation (DFI) processes of building envelopes. PhD thesis, University of Sheffield, UK.

Piroozfar, P; Altan, H and Popovic-Larsen, O (2012) Design for sustainability: A comparative study of a customized modern method of construction versus conventional methods of construction. Architectural Engineering and Design Management, 8(1), pp. 55-75. ISSN 1745-2007

Pokharel, H K (2023) Improving quality: Exploring ceramic water filters in developing communities. PhD thesis, University of Rhode Island, USA.

Polat, G (2009) Simulation-based efficiency assessment approach for rebar supply chains in Turkey. Construction Innovation, 9(1), pp. 101-121. ISSN 1471-4175

Polat, G and Arditi, D (2005) The JIT materials management system in developing countries. Construction Management and Economics, 23(7), pp. 697-712. ISSN 01446193

Polat, G; Arditi, D; Ballard, G and Mungen, U (2006) Economics of on-site vs off-site fabrication of rebar. Construction Management and Economics, 24(11), pp. 1185-1198. ISSN 1466433X

Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.

Popovic, D (2020) The development and use of product platforms in single-family industrialized house building. PhD thesis, Jönköping University, Sweden.

Poshdar, M; González, V A; Raftery, G M and Orozco, F (2014) Characterization of process variability in construction. Journal of Construction Engineering and Management, 140(11): 5014009, ISSN 0733-9364

Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.

Prasanna, M and Vinodh, S (2013) Lean six sigma in SMEs: An exploration through literature review. Journal of Engineering, Design and Technology, 11(3), pp. 224-250. ISSN 1726-0531

Pridmore, A B (2009) Development of composite renewal systems for rapid rehabilitation and construction of bridge decks. PhD thesis, University of California, San Diego, USA.

Psilander, K (2012) Managing production costs of small and large developers in Sweden: A case study on multi-family construction. International Journal of Construction Education and Research, 8(1), pp. 47-62. ISSN 1557-8771

Purnomo, M R A; Anugerah, A R; Aulia, S F and Azzam, A (2021) A novel optimisation model in the collaborative supply chain with production time capacity consideration. Journal of Engineering, Design and Technology, 19(3), pp. 647-658. ISSN 1726-0531

Pérez, Z G (2005) Appropriate designs and appropriating irrigation systems : Irrigation infrastructure development and users' management capability in Bolivia. PhD thesis, Wageningen University and Research, Netherlands.

Qi, B (2021) BIM and ontological-based framework for design, manufacturing, and assembling requirements checking of prefabricated component. PhD thesis, University of Florida, USA.

Radebe, T B; Huan, Z and Baloyi, J (2021) Simulation of eutectic plates in medium refrigerated transport. Journal of Engineering, Design and Technology, 19(1), pp. 62-80. ISSN 1726-0531

Rafferty, M and Toner, P (2019) Thinking like capital markets: Financialisation of the Australian construction industry. Construction Management and Economics, 37(3), pp. 156-168. ISSN 01446193

Rahnamayie Zekavat, P (2014) Performance assessment of agile communication in construction. PhD thesis, University of New South Wales, Australia.

Raisbeck, P; Millie, R and Maher, A (2010) Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ramaji, I J and Memari, A M (2016) Product architecture model for multistory modular buildings. Journal of Construction Engineering and Management, 142(10): 04016047, ISSN 0733-9364

Rampini, Luca (2023) Artificial intelligence enhances digital asset management. PhD thesis, Politecnico di Milano, Italy.

Rashid, R A (1998) A model for an effective implementation of the government technology transfer policy in the Malaysian construction industry. PhD thesis, University of Reading, UK.

Rausch, C; Lu, R; Talebi, S and Haas, C (2023) Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 23(3), pp. 565-578. ISSN 1562-3599

Rausch, C; Sanchez, B and Haas, C (2021) Topology optimization of architectural panels to minimize waste during fabrication: Algorithms for panel unfolding and nesting. Journal of Construction Engineering and Management, 147(7): 2089, ISSN 0733-9364

Raymond, A J; Kendall, A; Dejong, J T; Kavazanjian, E; Woolley, M A and Martin, K K (2021) Life cycle sustainability assessment of fugitive dust control methods. Journal of Construction Engineering and Management, 147(3): 04020181, ISSN 0733-9364

Rekola, M; Kojima, J and Mäkeläinen, T (2010) Towards integrated design and delivery solutions: Pinpointed challenges of process change. Architectural Engineering and Design Management, 6(4), pp. 264-278. ISSN 1745-2007

Remøy, H and Van Der Voordt, T (2014) Adaptive reuse of office buildings into housing: Opportunities and risks. Building Research & Information, 42(3), pp. 381-390. ISSN 0961-3218

Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099

Rezaei, M; Mostafaeipour, A; Jafari, N; Naghdi-Khozani, N and Moftakharzadeh, A (2020) Wind and solar energy utilization for seawater desalination and hydrogen production in the coastal areas of southern Iran. Journal of Engineering, Design and Technology, 18(6), pp. 1951-1969. ISSN 1726-0531

Riaz, Z (2008) Improving construction plant safety using advanced ICT. PhD thesis, Loughborough University, UK.

Riaz, Z; Edwards, D J; Holt, G D and Thorpe, T (2011) Data flow analysis of plant and equipment health and safety management. Journal of Engineering, Design and Technology, 9(2), pp. 178-203. ISSN 1726-0531

Riaz, Z; Edwards, D J; Mackenzie, J and Thorpe, T (2006) Emerging information, communication and technology systems applied to construction vehicle safety. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Righetto, E.; Micelli, E. and Pellegrino, M. (2026) Can the deep retrofit of the housing stock cost less? Learning curves and the costs of off-site industrialised construction in France. Construction Management and Economics, 44(5), pp. 359-380. ISSN 0144-6193

Robertson, Aaron D (2026) Towards a new housebuilding paradigm: A systems theory approach to supply chain reconfiguration. PhD thesis, University of Salford, UK.

Robinson, A; Austin, S and Gibb, A (2011) Efficiencies in design and manufacturing for construction using shipping containers. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Rogan, A (1999) Inter-organisational relationships in the construction process. PhD thesis, University of the West of England, Bristol, UK.

Rooke, J A; Koskela, L and Kagioglou, M (2009) Informality in organization and research: A review and a proposal. Construction Management and Economics, 27(10), pp. 913-922. ISSN 1466433X

Rosenbaum, S; Toledo, M and González, V (2014) Improving environmental and production performance in construction projects using value-stream mapping: Case study. Journal of Construction Engineering and Management, 140(2): 04013045, ISSN 0733-9364

Rosso, S (2007) Environmental life-cycle of domestic kitchen refurbishment. PhD thesis, University of Brighton, UK.

Roy, R; Brown, J and Gaze, C (2003) Re-engineering the construction process in the speculative house-building sector. Construction Management and Economics, 21(2), pp. 137-146. ISSN 01446193

Roy, R and Cochrane, S P (1999) Development of a customer focused strategy in speculative house building. Construction Management and Economics, 17(6), pp. 777-787. ISSN 01446193

Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.

Ruikar, D (2004) Design process improvement using a model based approach. PhD thesis, University of Nottingham, UK.

Saad, A M; Zulu, S L and Dulaimi, M (2024) “It's your fault!”, said a public client to modernity advocates: An exploration of UK public sector’s viewpoints on the modern methods of construction. Construction Innovation, 24(6), pp. 1483-1504. ISSN 1471-4175

Sabet, P; Jonescu, E; Chong, H Y and Ramanyaka, C E (2025) Interacting possibilities between building information modelling and off-site manufacturing for performance improvement. Construction Economics and Building, 25(1), pp. 221-243. ISSN 2204-9029

Sabharwal, A; Syal, M and Hastak, M (2009) Impact of manufactured housing component assembly redesign on facility layout and production process. Construction Innovation, 9(1), pp. 58-71. ISSN 1471-4175

Sacks, R (2016) What constitutes good production flow in construction? Construction Management and Economics, 34(9), pp. 641-656. ISSN 01446193

Sacks, R and Partouche, R (2010) Empire State Building project: Archetype of "mass construction". Journal of Construction Engineering and Management, 136(6), pp. 702-710. ISSN 0733-9364

Sacks, R; Seppänen, O; Priven, V and Savosnick, J (2017) Construction flow index: A metric of production flow quality in construction. Construction Management and Economics, 35(1-2), pp. 45-63. ISSN 01446193

Sadoughi, A; Kouhirostami, M; Kouhirostamkolaei, M; Qi, B and Costin, A (2024) Autonomous building design for manufacturing and assembly: A systematic review of design application, challenges, and opportunities. Journal of Construction Engineering and Management, 150(9): 03124006, ISSN 0733-9364

Said, H; Rajagopalan, A and Hall, D M (2025) Longitudinal analysis of interorganizational collaborative networks of cross-laminated timber (CLT) construction. Construction Innovation, 25(6), pp. 1840-1864. ISSN 1471-4175

Said, H (2016) Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms. Journal of Construction Engineering and Management, 142(2): 04015071, ISSN 0733-9364

Said, H M and Kandimalla, P (2018) Performance measurement of building sheet-metal ductwork prefabrication under batch production settings. Journal of Construction Engineering and Management, 144(2): 4017107, ISSN 0733-9364

Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.

Salhab, D; Lindhard, S M and Hamzeh, F (2024) Schedule compression and emerging waste in construction: An assessment of overlapping activities. Engineering, Construction and Architectural Management, 31(12), pp. 4920-4941. ISSN 0969-9988

Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364

Salih, F and El-Adaway, I H (2024) Quantifying the impact of technology utilization on schedule and cost performance in construction projects. Journal of Construction Engineering and Management, 150(8): 04024078, ISSN 0733-9364

Salvatierra-Garrido, J (2012) Conceptualising value for construction: experience from social housing projects in Chile. PhD thesis, Loughborough University, UK.

Samarasinghe, D A S (2014) Building materials supply chains: An evaluative study of the New Zealand residential construction. PhD thesis, Auckland University of Technology, New Zealand.

Samuelsson, P (2006) Integrated measurement and assessment of performance in large organizations: The case of a Swedish construction company. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Sanna, F (2018) Timber modern methods of construction: a comparative study. PhD thesis, Edinburgh Napier University, UK.

Santamaria Carrera, J L (2017) Quantifying the effect of construction site factors on concrete quality, costs and production rates. PhD thesis, University of New Mexico, USA.

Sardén, Y and Engström, S (2010) Modern methods of construction: A solution for an industry characterized by uncertainty? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Sardén, Y and Stehn, L (2005) Managing transformation, flow and value generation: A solid timber frame housing case. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Sargent, A C (2018) Building modern India: Transformations of labor in the Indian construction industry. PhD thesis, University of Chicago, USA.

Sarkar, D and Dutta, G (2010) Design and application of risk adjusted cumulative sum for strength monitoring of ready mixed concrete. Journal of Construction Engineering and Management, 136(6), pp. 623-631. ISSN 0733-9364

Satish, S. and Umar, T. (2026) Bridging innovation and practice: Assessing the readiness for 3D printing in construction. Engineering, Construction and Architectural Management, 33(7), pp. 6014-6038. ISSN 0969-9988

Satwiko, P; Prasetya, A and Suhedi, F (2019) Noise-reducing vents for windows in warm, humid, tropical countries. Architectural Engineering and Design Management, 15(2), pp. 141-158. ISSN 1745-2007

Saurin, T A; Formoso, C T and Cambraia, F B (2005) Analysis of a safety planning and control model from the human error perspective. Engineering, Construction and Architectural Management, 12(3), pp. 283-298. ISSN 0969-9988

Sayed, E (2022) Biomimetic intelligence for systemic innovation in the built environment. PhD thesis, University of Northumbria at Newcastle, UK.

Schlueter, A (2010) Model-based, performance-oriented building design employing distributed service systems. DSc thesis, ETH Zürich, Switzerland.

Schoenwitz, M (2014) Aligning product and processes to customer needs in prefabricated house building. PhD thesis, Cardiff University, UK.

Schoenwitz, M; Naim, M and Potter, A (2012) The nature of choice in mass customized house building. Construction Management and Economics, 30(3), pp. 203-219. ISSN 1466433X

Scott, L and Kanjanabootra, S (2019) The productivity, performance and quality paradox: An alternative perspective. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Senaratne, S and Sexton, M G (2004) Managing construction project change in the knowledge age: A case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Senghore, O; Hastak, M; Abdelhamid, T S; AbuHammad, A and Syal, M G (2004) Production process for manufactured housing. Journal of Construction Engineering and Management, 130(5), pp. 708-718. ISSN 0733-9364

Seong, J; Kim, H s and Jung, H J (2025) Development of a robust hazardous area tracking algorithm for pan-tilt-zoom (ptz) cameras at construction sites under harsh conditions. Engineering, Construction and Architectural Management, 32(13), pp. 384-405. ISSN 0969-9988

Shafiee, S; Piroozfar, P; Forberg, L F; Hansen, H N and Farr, E (2025) Enhancing efficiency and sustainability in construction: a product configurator for customizable off-site building solutions. Architectural Engineering and Design Management, 21(3), pp. 450-466. ISSN 1745-2007

Shafiee, S; Piroozfar, P; Hvam, L; Farr, E R P; Huang, G Q; Pan, W; Kudsk, A; Rasmussen, J B and Korell, M (2020) Modularisation strategies in the AEC industry: A comparative analysis. Architectural Engineering and Design Management, 16(4), pp. 270-292. ISSN 1745-2007

Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Shahedi, F; Etemadfard, H; Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024114, ISSN 0733-9364

Shapira, A; Filin, S and Wicnudel, A (2014) Quantitative analysis of blind tower-crane lifts using laser-scanning information. Construction Innovation, 14(3), pp. 383-403. ISSN 1471-4175

Sharif, M M; Chuo, S and Haas, C T (2022) Rapid 3D quality control in prefabrication using a 3D digital-templates framework. Journal of Construction Engineering and Management, 148(11): 04022117, ISSN 0733-9364

Sharma, H; Sohani, N and Yadav, A (2023) Structural modeling of lean supply chain enablers: A hybrid AHP and ISM-MICMAC based approach. Journal of Engineering, Design and Technology, 21(6), pp. 1658-1689. ISSN 1726-0531

Shen, Q; Lo, K K and Wang, Q (1998) Priority setting in maintenance management: A modified multi-attribute approach using analytic hierarchy process. Construction Management and Economics, 16(6), pp. 693-702. ISSN 01446193

Shepherd, S and Woskie, S R (2010) Case study to identify barriers and incentives to implementing an engineering control for concrete grinding dust. Journal of Construction Engineering and Management, 136(11), pp. 1238-1248. ISSN 0733-9364

Shetterly, D R (1998) The influence of contract design on contractor performance: A multivariate analysis. PhD thesis, University of Maryland, Baltimore County, USA.

Shi, J; Hu, J; Ma, M and Wang, H (2021) An environmental impact analysis method of machine-tool cutting units based on LCA. Journal of Engineering, Design and Technology, 19(5), pp. 1192-1206. ISSN 1726-0531

Shi, Q; Yu, J; Zhang, L; Su, Y; Wang, J and Kong, Q (2025) An optimization model for the duration of workshop production processes for precast concrete components for highway projects. International Journal of Construction Management, 25(7), pp. 813-825. ISSN 1562-3599

Shi, W (2009) Framework for integration of BIM and RFID in steel construction. PhD thesis, University of Florida, USA.

Shiers, D; Lavers, A and Keeping, M (2007) Indicators of the impact of environmental factors on UK construction law: Developments in the new millennium. Construction Management and Economics, 25(7), pp. 821-829. ISSN 1466433X

Shin, S and Issa, R R A (2021) Bimasr: Framework for voice-based BIM information retrieval. Journal of Construction Engineering and Management, 147(10): 04021124, ISSN 0733-9364

Shipworth, D (2006) Qualitative modelling of sustainable energy scenarios: An extension of the bon qualitative input-output model. Construction Management and Economics, 24(7), pp. 695-703. ISSN 1466433X

Short, C A; Lomas, K J and Woods, A (2004) Design strategy for low-energy ventilation and cooling within an urban heat island. Building Research & Information, 32(3), pp. 187-206. ISSN 0961-3218

Shrestha, B K (2021) Relationship between standardization critical success factors (CSFs) and project performance. PhD thesis, University of Nevada, Las Vegas, USA.

Shurrab, J and Hussain, M (2018) An empirical study of the impact of lean on the performance of the construction industry in UAE. Journal of Engineering, Design and Technology, 16(5), pp. 694-710. ISSN 1726-0531

Sibanda, V; Mpofu, K and Trimble, J (2021) Methodology for the design of a reconfigurable guillotine shear and bending press machine (rgs&BPM). Journal of Engineering, Design and Technology, 19(6), pp. 1317-1343. ISSN 1726-0531

Sibanda, V; Mpofu, K; Trimble, J and Kanganga, M (2020) Development of part families for a reconfigurable machine. Journal of Engineering, Design and Technology, 18(5), pp. 991-1014. ISSN 1726-0531

Sikorsky, C S (1990) Product and process integration for the US design-construction industry. PhD thesis, Texas A&M University, USA.

Silver, M L (1981) Craft production: Work and alienation in the construction industry. PhD thesis, Columbia University, USA.

Simukonda, W T (2024) Modelling offsite construction to control hazards and direct cost of accidents. PhD thesis, Nelson Mandela University, South Africa.

Singh, A (1990) Development of process and mix flexibility in construction. PhD thesis, Purdue University, USA.

Singh, A (2002) Lean engineering for mass housing: Design, manufacture and site erection. Journal of Construction Research, 3(1), pp. 97-122. ISSN 1609-9451

Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.

Skibniewski, M J (1991) Information management system for new construction technologies. Construction Management and Economics, 9(1), pp. 39-49. ISSN 01446193

Skibniewski, M J and Chao, L C (1992) Evaluation of advanced construction technology with AHP method. Journal of Construction Engineering and Management, 118(3), pp. 577-593. ISSN 0733-9364

Skinnarland, S (2013) Use of progression planning tools in developing collaborative main contractor-subcontractor relationships in Norway. PhD thesis, Heriot-Watt University, UK.

Skinner, D W H (1974) An investigation of the contractor's use of bills of quantities. PhD thesis, Aston University, UK.

Smith, S and Roy, R (2002) Product configuration in the house-building industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Smith, S A (1986) Iron and steel in long-span construction 1847-1890: A study of change and innovation. PhD thesis, Imperial College London, UK.

Sobotka, A (2000) Simulation modelling for logistics re-engineering in the construction company. Construction Management and Economics, 18(2), pp. 183-195. ISSN 01446193

Soetanto, R (2010) Act-UK simulation centre: Opportunities and challenges for research. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Soleimani, M and Shahandashti, M (2017) Comparative process-based life-cycle assessment of bioconcrete and conventional concrete. Journal of Engineering, Design and Technology, 15(5), pp. 667-688.

Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.

Soltani, A R (2005) An intelligent transportation system in construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Soltani, M; Aouag, H and Mouss, M D (2020) An integrated framework using VSM, AHP and TOPSIS for simplifying the sustainability improvement process in a complex manufacturing process. Journal of Engineering, Design and Technology, 18(1), pp. 211-229. ISSN 1726-0531

Soman, R K and Whyte, J K (2020) Codification challenges for data science in construction. Journal of Construction Engineering and Management, 146(7): 04020072, ISSN 0733-9364

Somani, N; Tyagi, Y K and Gupta, N K (2024) An investigation on the influence of sintering temperature on microstructural, physical and mechanical properties of cu-sic composites. Journal of Engineering, Design and Technology, 22(1), pp. 77-88. ISSN 1726-0531

Song, J; Fagerlund, W R; Haas, C T; Tatum, C B and Vanegas, J A (2005) Considering prework on industrial projects. Journal of Construction Engineering and Management, 131(6), pp. 723-733. ISSN 0733-9364

Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.

Song, L and Abourizk, S M (2008) Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134(10), pp. 786-794. ISSN 0733-9364

Song, M H (2019) Formalization of smallest workface boundary (SWFB): Toward generating and operating level of development (LOD) 400-based daily bill of materials (BOM). PhD thesis, Stanford University, USA.

Song, M H and Fischer, M (2020) Generating a daily bill of materials at level of development 400 using the smallest workface boundary. Journal of Construction Engineering and Management, 146(5): 04020035, ISSN 0733-9364

Sousa, Rita dos Santos (2019) Production planning and control methodology for soil bioengineering works. PhD thesis, Universidade Federal de Santa Maria, Brazil.

Souza, Douglas Lopes de (2024) Natural language processing of technical standard for the construction sector the study of the nbr 15.575. PhD thesis, Universidade Estadual de Campinas, Brazil.

Srithongrung, A (2006) The impact of state capital budget and management programs on state capital budget decisions and economic performance. DPA thesis, University of Illinois at Springfield, USA.

Ssenyimba, S; Kigozi, J; Tumutegyereize, P; Muyonga, J H and Mutumba, R (2022) Design and evaluation of a refractance window lab-scale dryer. Journal of Engineering, Design and Technology, 20(6), pp. 1499-1518. ISSN 1726-0531

Stefańska, A; Cygan, M; Batte, K and Pietrzak, J (2021) Application of timber and wood-based materials in architectural design using multi-objective optimisation tools. Construction Economics and Building, 21(3), pp. 105-121. ISSN 2204-9029

Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.

Stevens, M S (2012) Impact of key management practices on overhead to direct cost ratio for specialty construction contractors. PhD thesis, University of Florida, USA.

Sturges, J and Bates, M (2000) Thriving on chaos: The result of poor planning: Some views from the housebuilding sector. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Styhre, A (2011) In the circuit of credibility: Construction workers and the norms of 'a good job'. Construction Management and Economics, 29(2), pp. 199-209. ISSN 1466433X

Sundquist, J (2004) Low innovation among building material suppliers: The natural level of the trade. Construction Economics and Building, 4(1), pp. 35-44. ISSN 2204-9029

Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.

Suriyanon, N; Sutheerawatthana, P; Rinchumphu, D and Suksawat, R (2025) Carbon footprint assessment of a precast concrete yard: A case study from Thailand. Construction Economics and Building, 25(2), pp. 43-68. ISSN 2204-9029

Sutrisna, M; Ramanayaka, C D D and Goulding, J S (2018) Developing work breakdown structure matrix for managing offsite construction projects. Architectural Engineering and Design Management, 14(5), pp. 381-397. ISSN 1745-2007

Svatoš-Ražnjević, H; Boeva, Y; Kropp, C and Menges, A (2025) Trajectories from standard to incremental and pioneering innovation in timber construction: Multi-storey timber buildings in Germany, Austria, and Switzerland. Building Research & Information, 53(6), pp. 734-758. ISSN 0961-3218

Sweis, G J (2000) Impact of conversion technology on productivity in masonry construction. PhD thesis, Northwestern University, USA.

Söderholm, E and Johnsson, H (2009) Housing design performance: How is it measured? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Sędzicki, D.; Nyka, L. and Cudzik, J. (2026) Algorithmic optimization of climbing plant positioning and cnc fabrication for urban microclimate enhancement. Building Research & Information, 54(5), pp. 588-610. ISSN 0961-3218

Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation. PhD thesis, University of Alberta, Canada.

Tahmasebinia, F; M.E. Sepasgozar, S; Shirowzhan, S; Niemela, M; Tripp, A; Nagabhyrava, S; Mansuri, K Z and Alonso-Marroquin, F (2020) Criteria development for sustainable construction manufacturing in Construction Industry 4.0: Theoretical and laboratory investigations. Construction Innovation, 20(3), pp. 379-400. ISSN 1471-4175

Tamke, M; Sinke Baranovskaya, Y; Monteiro, F; Lienhard, J; La Magna, R and Ramsgaard Thomsen, M (2021) Computational knit–design and fabrication systems for textile structures with customised and graded CNC knitted fabrics. Architectural Engineering and Design Management, 17(3-4), pp. 175-195. ISSN 1745-2007

Tan, T; Lu, W; Tan, G; Xue, F; Chen, K; Xu, J; Wang, J and Gao, S (2020) Construction-oriented design for manufacture and assembly guidelines. Journal of Construction Engineering and Management, 146(8): 04020085, ISSN 0733-9364

Tan, T; Mills, G; Papadonikolaki, E; Li, B and Huang, J (2023) Digital-enabled design for manufacture and assembly (dfma) in offsite construction: A modularity perspective for the product and process integration. Architectural Engineering and Design Management, 19(3), pp. 267-282. ISSN 1745-2007

Tan, W (2011) Managing lean projects: Understanding the structures of lean production. International Journal of Construction Management, 11(3), pp. 67-78. ISSN 1562-3599

Tanaka, M (2008) Essays on durability and the Japanese housing market. PhD thesis, Johns Hopkins University, USA.

Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364

Tariq, S; Hussein, M; Wang, R D and Zayed, T (2022) Trends and developments of on-site crane layout planning 1983–2020: Bibliometric, scientometric and qualitative analyses. Construction Innovation, 22(4), pp. 1011-1035. ISSN 1471-4175

Tas, E; Cakmak, P I and Levent, H (2013) Determination of behaviors in building product information acquisition for developing a building product information system in Turkey. Journal of Construction Engineering and Management, 139(9), pp. 1250-1258. ISSN 0733-9364

Tatum, C B (1987) Process or innovation in construction firm. Journal of Construction Engineering and Management, 113(4), pp. 648-663. ISSN 0733-9364

Taylor, M D (2010) A definition and valuation of the UK offsite construction sector. Construction Management and Economics, 28(8), pp. 885-896. ISSN 1466433X

Taylor, M D (2022) A definition and valuation of the UK offsite construction sector: Ten years on. International Journal of Construction Management, 22(15), pp. 2877-2885. ISSN 1562-3599

Taylor, M D; Fisher, A and Wamuziri, S C (2009) A comparison of modern methods of bathroom construction: A project case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Taylor, M D and Wamuziri, S C (2002) Strategic construction mechatronics valuation: A real option-pricing approach. Journal of Financial Management of Property and Construction, 7(2), pp. 75-90. ISSN 1366-4387

Tehrani, B M; BuHamdan, S and Alwisy, A (2024) Robotics in industrialized construction: An activity-based ranking system for assembly manufacturing tasks. Engineering, Construction and Architectural Management, 31(6), pp. 2264-2285. ISSN 0969-9988

Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Teo, P L; Bridge, A J; Gray, J and Jefferies, M C (2011) Developing a research method to test a new first-order decision making model for the procurement of public sector major infrastructure. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Tesfagaber, G (2004) Application of PSL to construction process information specification and exchange. PhD thesis, Loughborough University, UK.

Tetik, M; Peltokorpi, A; Seppänen, O; Leväniemi, M and Holmström, J (2021) Kitting logistics solution for improving on-site work performance in construction projects. Journal of Construction Engineering and Management, 147(1): 05020020, ISSN 0733-9364

Tezel, B A (2011) Visual management: an exploration of the concept and its implementation in construction. PhD thesis, University of Salford, UK.

Thajudeen, S; Elgh, F and Lennartsson, M (2022) A framework supporting mixed production strategies in platform development: A case study in post and beam building system. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Thajudeen, S; Lennartsson, M and Elgh, F (2020) Identification of challenges and success factors in industrialised house building design. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 27-37. ISSN 17514304

Thomas, H R; Horman, M J; De Souza, U E L and Zavřski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2), pp. 144-154. ISSN 0733-9364

Thomas, H R; Horman, M J; Minchin Jr, R E and Chen, D (2003) Improving labor flow reliability for better productivity as lean construction principle. Journal of Construction Engineering and Management, 129(3), pp. 251-261. ISSN 0733-9364

Thomas, H R and Sanvido, V E (2000) Role of the fabricator in labor productivity. Journal of Construction Engineering and Management, 126(5), pp. 358-365. ISSN 0733-9364

Thorpe, D and Zhuge, Y (2010) Advantages and disadvantages in using permeable concrete pavement as a pavement construction material. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Thuesen, C and Hvam, L (2011) Efficient on-site construction: Learning points from a German platform for housing. Construction Innovation, 11(3), pp. 338-355. ISSN 1471-4175

Thuesen, C; Jensen, J S and Gottlieb, S C (2009) Making the long tail work: Reflections on the development of the construction industry the past 25 years. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Thuesen, C; Koch, C and Nielsen, J S (2010) Strategy and business development practices in Danish constrution industry SMEs. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Toledo, L; Wright, A and Cropper, P (2025) Case study investigation of overheating in low-energy homes: Insights from a post-occupancy evaluation in England. Building Research & Information, 53(1-2), pp. 139-164. ISSN 0961-3218

Tombesi, P (1997) Travels from flatland: The Walt Disney concert hall and the specialization of design knowledge in the building sector. PhD thesis, University of California, Los Angeles, USA.

Tommelein, I D (2015) Journey toward lean construction: Pursuing a paradigm shift in the AEC industry. Journal of Construction Engineering and Management, 141(6): 04015005, ISSN 0733-9364

Tommelein, I D; Levitt, R E and Hayes-Roth, B (1992) Site-layout modeling: How can artificial intelligence help? Journal of Construction Engineering and Management, 118(3), pp. 594-611. ISSN 0733-9364

Touran, A and Ladick, D R (1989) Application of robotics in bridge deck fabrication. Journal of Construction Engineering and Management, 115(1), pp. 35-52. ISSN 0733-9364

Tramontini, L M (2024) Towards the integration of additive manufacturing for freeform steel and glass façade construction. PhD thesis, Delft University of Technology, Netherlands.

Trani, M L; Cassano, M; Minotti, M and Todaro, D (2014) Construction site BIM requirements. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Trethewy, R W and Atkinson, M (2003) Enhanced safety, health and environment outcomes through improved design. Journal of Engineering, Design and Technology, 1(2), pp. 187-201. ISSN 1726-0531

Tribelsky, E and Sacks, R (2011) An empirical study of information flows in multidisciplinary civil engineering design teams using lean measures. Architectural Engineering and Design Management, 7(2), pp. 85-101. ISSN 1745-2007

Trinder, L (2018) Design for manufacture and assembly: Its benefits and risks in the UK water industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 152-163. ISSN 17514304

Trinder, L; Browne, J and Brocklebank, K (2018) A client's perspective of design for manufacture and assembly in the UK water industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 141-151. ISSN 17514304

Tsao, C C Y (2005) Use of work structuring to increase performance of project-based production systems. PhD thesis, University of California, Berkeley, USA.

Tsao, C C Y; Tommelein, I D; Swanlund, E S and Howell, G A (2004) Work structuring to achieve integrated product-process design. Journal of Construction Engineering and Management, 130(6), pp. 780-789. ISSN 0733-9364

Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Tsenkova, S (1998) Private housebuilding and housing markets in transitional economies: The case of Bulgaria. PhD thesis, University of Toronto, Canada.

Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects. PhD thesis, University of California, Berkeley, USA.

Uggla, G (2021) Model and reality: Connecting BIM and the built environment. PhD thesis, KTH Royal Institute of Technology, Sweden.

Ulubeyli, S; Kazaz, A and Sahin, S (2018) Survival of construction SMEs in macroeconomic crises: Innovation-based competitive strategies. Journal of Engineering, Design and Technology, 16(4), pp. 654-673. ISSN 1726-0531

Umar, M; Ofem, M I; Anwar, A S and Salisu, A G (2021) Modelling of mechanical properties of Pa6 based reinforced graphite and graphite nano platelets composites using different aspect ratio. Journal of Engineering, Design and Technology, 19(4), pp. 809-827. ISSN 1726-0531

Unger, C (2006) Industrialised house building: Fundamental change or business as usual? PhD thesis, KTH Royal Institute of Technology, Sweden.

Upstill-Goddard, J; Glass, J; Dainty, A R J and Nicholson, I (2012) Integrating responsible sourcing in the construction supply chain. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Valente, C P; Brandalise, F M P and Formoso, C T (2019) Model for devising visual management systems on construction sites. Journal of Construction Engineering and Management, 145(2): 04018138, ISSN 0733-9364

Vanegas, J A; Bravo, E B and Halpin, D W (1993) Simulation technologies for planning heavy construction processes. Journal of Construction Engineering and Management, 119(2), pp. 336-354. ISSN 0733-9364

Vaz, D; Al Bizri, S and Gray, C (2008) The management of the design of modern curtain wall cladding systems. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Vennström, A and Erik Eriksson, P (2010) Client perceived barriers to change of the construction process. Construction Innovation, 10(2), pp. 126-137. ISSN 1471-4175

Viana, D D; Formoso, C T and Bataglin, F S (2022) Requirements for developing production planning and control systems for engineer-to-order industrialized building systems. Construction Management and Economics, 40(7-8), pp. 638-652. ISSN 01446193

Vidyadhar, R; Sudeep, K R; Vinodh, S and Antony, J (2016) Application of fuzzy logic for leanness assessment in SMEs: A case study. Journal of Engineering, Design and Technology, 14(1), pp. 78-103.

Vieira, Luiz de Brito Prado (2020) Analysis of technologies for recycling the waste generated in concrete production in ready mixed concrete plants. PhD thesis, Universidade de São Paulo, Brazil.

Vijay, V; Chandra, R and Subbarao, P M V (2022) Biomass as a means of achieving rural energy self-sufficiency: A concept. Built Environment Project and Asset Management, 12(3), pp. 382-400. ISSN 2044-124X

Vinodh, S and Aravindraj, S (2012) Axiomatic modeling of lean manufacturing system. Journal of Engineering, Design and Technology, 10(2), pp. 199-216. ISSN 1726-0531

Vinodh, S; Kamala, V and Jayakrishna, K (2015) Application of fuzzy axiomatic design methodology for selection of design alternatives. Journal of Engineering, Design and Technology, 13(1), pp. 2-22.

Vinodh, S; Selvaraj, T; Chintha, S K and K. E. K., V (2015) Development of value stream map for an Indian automotive components manufacturing organization. Journal of Engineering, Design and Technology, 13(3), pp. 380-399.

Vinodh, S; Somanaathan, M and Arvind, K R (2013) Development of value stream map for achieving leanness in a manufacturing organization. Journal of Engineering, Design and Technology, 11(2), pp. 129-141. ISSN 1726-0531

Vithanage, S C; Sing, M C P; Davis, P and Newaz, M T (2022) Assessing the off-site manufacturing workers' influence on safety performance: A Bayesian network approach. Journal of Construction Engineering and Management, 148(1): 04021185, ISSN 0733-9364

Vogelius, P and Storgaard, K (2016) Cooperation in construction: The role of values. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Vogl, B and Abdel-Wahab, M (2015) Measuring the construction industry's productivity performance: Critique of international productivity comparisons at industry level. Journal of Construction Engineering and Management, 141(4): 04014085, ISSN 0733-9364

Voordijk, H and Vrijhoef, R (2003) Improving supply chain management in construction: What can be learned from the aerospace industry? In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Vrijhoef, R (2019) Studying time presence on site as an indicator of productive time use by construction workers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Vásquez-Hernández, A.; Pellicer, E.; Alarcón, L. F.; Capellaro Ferreira, T. and Martínez, P. (2026) Breaking the mirror: How conventional construction firms embrace industrialized construction. Journal of Construction Engineering and Management, 152(10): 04026163, ISSN 0733-9364

Vásquez-Hernández, A.; Pellicer, E.; Alarcón, L. F. and Tzortzopoulos, P. (2026) Typologies of industrialized construction adoption: Configurations in conventional construction firms. Journal of Construction Engineering and Management, 152(7): 04026093, ISSN 0733-9364

Waibel, C (2018) Simulation-based optimization of buildings and multi-energy systems. DSc thesis, ETH Zürich, Switzerland.

Wall, C M (2004) New ways of building: Architects, operatives and industrialised production in britain 1940-70. PhD thesis, University of Cambridge, UK.

Wang, C; Liu, M; Hsiang, S M and Leming, M L (2012) Causes and penalties of variation: Case study of a precast concrete slab production facility. Journal of Construction Engineering and Management, 138(6), pp. 775-785. ISSN 0733-9364

Wang, J (2023) Direct policy search for adaptive management of flood risk. PhD thesis, Purdue University, USA.

Wang, J; Shou, W; Wang, X and Wu, P (2016) Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction. Construction Management and Economics, 34(12), pp. 859-874. ISSN 01446193

Wang, L-H (2005) Vertical process integration in design and manufacturing of hardwood products. PhD thesis, University of Missouri - Columbia, USA.

Wang, M; Altaf, M S; Al-Hussein, M and Ma, Y (2020) Framework for an IoT-based shop floor material management system for panelized homebuilding. International Journal of Construction Management, 20(2), pp. 130-145. ISSN 1562-3599

Wang, P (2006) Production-based large scale construction simulation modeling. PhD thesis, University of Alberta, Canada.

Wang, P; Mohamed, Y; Abourizk, S M and Rawa, A R T (2009) Flow production of pipe spool fabrication: Simulation to support implementation of lean technique. Journal of Construction Engineering and Management, 135(10), pp. 1027-1038. ISSN 0733-9364

Wang, S; Tang, J; Zou, Y and Zhou, Q (2020) Research on production process optimization of precast concrete component factory based on value stream mapping. Engineering, Construction and Architectural Management, 27(4), pp. 850-871. ISSN 0969-9988

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wang, S-Y (2005) Computer experiment for improving construction processes. PhD thesis, Purdue University, USA.

Wang, Z; Liu, Y; Hu, H and Dai, L (2021) Hybrid rescheduling optimization model under disruptions in precast production considering real-world environment. Journal of Construction Engineering and Management, 147(4): 04021012, ISSN 0733-9364

Ward, S A (2015) Critical success factors for lean construction intervention. PhD thesis, University of Dundee, UK.

Wasim, M; Vaz Serra, P and Ngo, T D (2022) Design for manufacturing and assembly for sustainable, quick and cost-effective prefabricated construction–a review. International Journal of Construction Management, 22(15), pp. 3014-3022. ISSN 1562-3599

Wearne, Samuel Claude (2024) Dynamics of place & discourse: Empirical, methodological, and theoretical research into socio-cultural transformations toward sustainability. PhD thesis, University of Technology Sydney, Australia.

Wee, T P Y (2019) Product planning of manufactured construction products. PhD thesis, Imperial College London, UK.

Wei, Y; Choi, H and Lei, Z (2022) A generative design approach for modular construction in congested urban areas. Smart and Sustainable Built Environment, 11(4), pp. 1163-1181. ISSN 2046-6099

Wernicke, B (2020) Diversity of flow in production improvements in house building. PhD thesis, Luleå University of Technology, Sweden.

Wesz, J G B; Formoso, C T and Tzortzopoulos, P (2018) Planning and controlling design in engineered-to-order prefabricated building systems. Engineering, Construction and Architectural Management, 25(2), pp. 134-152. ISSN 0969-9988

Weththasinghe, K K and Wong, P S P (2023) Towards developing partnership models for leveraging design for manufacture and assembly for school buildings. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 75-90. ISSN 17514304

Whang, S W and Flanagan, R (2015) Minimisation of risk exposure at the pre-production stage through the use of contractor-led design management. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.

Wickramasinghe, V; Dias, P; Robert, D and Setunge, S (2024) From physical degradation condition ratings of building elements to lost value ratio bands. Built Environment Project and Asset Management, 14(6), pp. 858-873. ISSN 2044-124X

Williams, J M (1991) Interfaces: Integrating product design and process engineering in manufacturing and construction. PhD thesis, Stanford University, USA.

Winch, G M (2003) Models of manufacturing and the construction process: The genesis of re-engineering construction. Building Research & Information, 31(2), pp. 107-118. ISSN 0961-3218

Winn, K R (2014) Inter-scalar multivariable decision making framework for the architectural envelope. PhD thesis, Rensselaer Polytechnic Institute, USA.

Woju, U W and Balu, A S (2020) Fuzzy uncertainty and its applications in reinforced concrete structures. Journal of Engineering, Design and Technology, 18(5), pp. 1175-1191. ISSN 1726-0531

Wong, C H (2001) A discriminant model for classifying contractor performance on public works projects. PhD thesis, University of Wolverhampton, UK.

Wong, Francis Michael Wai-Ling (1965) The relation between cost, performance and comfort conditions in 58 office buildings in Sydney. PhD thesis, University of Sydney, Australia.

Wong, P S P; Cheung, S O and Chan, L L Y (2004) Enhancing construction value chain effectiveness in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wong Chong, Oscar (2022) IFC-based system and methods to support analysis of robot-assisted offsite construction. PhD thesis, Purdue University, USA.

Wu, C.; Luo, J.; Hong, Y.; Tan, Y. and Lan, W. (2026) A DfMA-incorporating parametric design approach for enhancing constructability in BIM-enabled architectural design in off-site construction. Journal of Construction Engineering and Management, 152(10): 05026006, ISSN 0733-9364

Wu, J; Sadraddin, H L; Ren, R; Zhang, J and Shao, X (2021) Invariant signatures of architecture, engineering, and construction objects to support BIM interoperability between architectural design and structural analysis. Journal of Construction Engineering and Management, 147(1): 04020148, ISSN 0733-9364

Wu, J; Yan, B; Sun, G; Liu, M; Li, Y and Zhou, C (2025) Research on the construction-forming model of a single-layer orthogonal saddle-shaped cable net with an opening. Journal of Construction Engineering and Management, 151(9): 05025008, ISSN 0733-9364

Wu, K (2019) Robotic assembly: A generative architectural design strategy through component arrangements in highly-constrained design spaces. PhD thesis, Princeton University, USA.

Wu, Lingzi (2021) Enhancing data-driven applications in construction. PhD thesis, University of Alberta, Canada.

Wu, P (2011) Application of the lean philosophy to reduce carbon emissions in the precast concrete industry of Singapore. PhD thesis, National University of Singapore, Singapore.

Wu, S; Xie, H; Zeng, Z; Wang, M; Zhao, H and Liu, Y (2023) Influence of pea-gravel layer on segment ring support performance in shield TBM tunnels: A discrete-continuous coupling simulation and model test. Journal of Construction Engineering and Management, 149(10): 04023097, ISSN 0733-9364

Wuni, I Y and Shen, G Q (2020) Stakeholder management in prefabricated prefinished volumetric construction projects: Benchmarking the key result areas. Built Environment Project and Asset Management, 10(3), pp. 407-421. ISSN 2044-124X

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2022) Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2108-2120. ISSN 1562-3599

Xin, Z.; Dong, J.; Zeng, H.; Xiong, Z.; Wang, B.; Yan, J. and Wang, Z. (2026) Key parameters and integrated techniques for mechanized tunnel construction via drilling and blasting method. Journal of Construction Engineering and Management, 152(9): 04026148, ISSN 0733-9364

Xiong, R (2024) Human-machine adaptation in lean waste elimination for customized building manufacturing systems. PhD thesis, Carnegie Mellon University, USA.

Xu, Yuqing (2025) Enhancing reliability and efficiency of upfront embodied carbon assessment leveraging openbim, llm, DES, and blockchain. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Yadavalli, H V; Krishna Mohan, T V; Rangarajan, S and Albert, S K (2022) Design, fabrication, testing and operation of a simulation facility for high temperature molten salt studies. Journal of Engineering, Design and Technology, 20(6), pp. 1369-1387. ISSN 1726-0531

Yang, Z.; Lu, W.; Wu, L. and Xu, J. (2026) Analysis of workflow variability in modular integrated construction manufacturing using cooperative game theory. Journal of Construction Engineering and Management, 152(8): 04026115, ISSN 0733-9364

Yang, X L (2010) Research on general contracter and subcontractor cooperative management in construction. PhD thesis, Harbin Institute of Technology, China.

Yang, Y; Pan, M and Pan, W (2022) Integrated offsite logistics scheduling approach for high-rise modular building projects. Journal of Construction Engineering and Management, 148(6): 04022032, ISSN 0733-9364

Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(6): 04024048, ISSN 0733-9364

Yashiro, T (2014) Conceptual framework of the evolution and transformation of the idea of the industrialization of building in Japan. Construction Management and Economics, 32(1-2), pp. 16-39. ISSN 01446193

Yazdi, Alireza Jalali (2022) Developing an integrated design support framework to enable mass-customisation in multi-storey timber building projects. PhD thesis, University of Technology Sydney, Australia.

Yi, H (2022) 4D-printed parametric façade in architecture: Prototyping a self-shaping skin using programmable two-way shape memory composite (twsmc). Engineering, Construction and Architectural Management, 29(10), pp. 4132-4152. ISSN 0969-9988

Younes, B (2013) A framework for invoice management in construction. PhD thesis, University of Alberta, Canada.

Yousefi, E; Ahmadian Fard Fini, A and Loganathan, S (2025) Production-oriented approach for optimal mass-customisation of floor panel layouts in cross-laminated timber (CLT) buildings. Engineering, Construction and Architectural Management, 32(9), pp. 5965-5988. ISSN 0969-9988

Yousefi, Elham (2023) Developing a data-driven design framework for mass customisation of multi-storey residential buildings. PhD thesis, University of Technology Sydney, Australia.

Yu, H (2010) An integrated approach toward lean for production homebuilders. PhD thesis, University of Alberta, Canada.

Yu, H; Tweed, T; Al-Hussein, M and Nasseri, R (2009) Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management, 135(8), pp. 782-790. ISSN 0733-9364

Yu, M; Wang, L; Ruan, W and Zheng, W (2025) Robust optimization for precast component production scheduling considering component transfer. Journal of Construction Engineering and Management, 151(10): 04025156, ISSN 0733-9364

Yu, Yifei (2024) Circular construction ecosystems: Designing a circularity information platform for the built environment. PhD thesis, University of Twente, Netherlands.

Yuan, Z; Li, Z; Lei, Z; Yang, Y; Zhang, W; Lin, W and Cao, L (2025) Enhancing the production performance of prefabricated buildings through the integrated optimization of precast component layout and worker allocation. Journal of Construction Engineering and Management, 151(2): 04024200, ISSN 0733-9364

Zakariya, K; Ibrahim, P H and Abdul Wahab, N A (2019) Conceptual framework of rural landscape character assessment to guide tourism development in rural areas. Journal of Construction in Developing Countries, 24(1), pp. 85-99. ISSN 1823-6499

Zaky, N; Ahmed, M Z; Alarjani, A and Attia, E A (2025) Lean manufacturing implementation in iron and steel industries: Effect of wastes management on the production costs. Journal of Engineering, Design and Technology, 23(2), pp. 525-545. ISSN 1726-0531

Zani, A; Speroni, A; Mainini, A G; Zinzi, M; Caldas, L and Poli, T (2024) Customized shading solutions for complex building façades: The potential of an innovative cement-textile composite material through a performance-based generative design. Construction Innovation, 24(1), pp. 256-279. ISSN 1471-4175

Zani, C M; Brandalise, F M P; Pedó, B; Formoso, C T; Tommelein, I D; Ortiz-Marcos, I; Viana, D D; Bataglin, F S and Koskela, L (2025) Devising a taxonomy for visual management requirements by considering different purposes and contexts. Construction Management and Economics, 43(7), pp. 518-536. ISSN 0144-6193

Zayed, T M and Halpin, D (2001) Simulation of concrete batch plant production. Journal of Construction Engineering and Management, 127(2), pp. 132-141. ISSN 0733-9364

Zeng, N; Liu, Y; Wang, C; Chen, Q; Liu, Y and Li, Q (2026) On- and off-site coordination in a modular construction supply chain: Domain-spanning production flow framing and evaluation. Journal of Construction Engineering and Management, 152(2): 04025245, ISSN 0733-9364

Zeng, N; Ye, X; Liu, Y and König, M (2024) BIM-enabled Kanban system in construction logistics for real-time demand reporting and pull replenishment. Engineering, Construction and Architectural Management, 31(8), pp. 3069-3096. ISSN 0969-9988

Zhai, X; Reed, R and Mills, A (2014) Addressing sustainable challenges in China: The contribution of off-site industrialisation. Smart and Sustainable Built Environment, 3(3), pp. 261-274. ISSN 2046-6099

Zhang, H and Yu, L (2020) Dynamic transportation planning for prefabricated component supply chain. Engineering, Construction and Architectural Management, 27(9), pp. 2553-2576. ISSN 0969-9988

Zhang, L (2022) Risk management framework to guide off-site manufacturing process: a Chinese perspective. PhD thesis, University of Strathclyde, UK.

Zhang, L and Agapiou, A (2020) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(4), pp. 145-162. ISSN 17514304

Zhang, L; Pan, C and Zou, X (2013) Criticality comparison between the repetitive scheduling method and the network model. Journal of Construction Engineering and Management, 139(10): 06013004, ISSN 0733-9364

Zhang, M; Cheng, W and Wang, Y (2018) Multiple-fault classification for hot-mix asphalt production by machine learning. Journal of Construction Engineering and Management, 144(5): 04018024, ISSN 0733-9364

Zhang, Y; Wang, J; Ahmad, R and Li, X (2022) Integrating lean production strategies, virtual reality technique and building information modeling method for mass customization in cabinet manufacturing. Engineering, Construction and Architectural Management, 29(10), pp. 3970-3996. ISSN 0969-9988

Zhang, Z (2021) Participatory ergonomics in construction: Enabling practice-to-research-to-practice via the 2safemodel. PhD thesis, University of Washington, USA.

Zhao, H (2017) Distributed building information modeling in multidisciplinary collaboration. DSc thesis, ETH Zürich, Switzerland.

Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364

Zhou, J; Wang, G and Diao, Z (2026) Enabling digital transformation of traditional enterprises through industrial internet platforms: A study from an ecosystem perspective. Engineering, Construction and Architectural Management, 33(1), pp. 413-434. ISSN 0969-9988

Zhou, H W; Zhou, Y H and Zhao, C J (2016) Fault-response mechanism of production system in concrete-dam-construction simulation. Journal of Construction Engineering and Management, 142(11): 04016065, ISSN 0733-9364

Zhou, Xiaoyan (2023) A reinforcement learning neural network approach to online optimization of construction manufacturing processes. PhD thesis, University of Florida, USA.

Zhou, Y; Wang, X; Gosling, J and Naim, M M (2023) The system dynamics of engineer-to-order construction projects: Past, present, and future. Journal of Construction Engineering and Management, 149(5): 03123004, ISSN 0733-9364

Zou, P X W and Leslie-Carter, R (2010) Lessons learned from managing the design of the 'water cube' national swimming centre for the Beijing 2008 Olympic Games. Architectural Engineering and Design Management, 6(3), pp. 175-188. ISSN 1745-2007

Zou, Y; Wu, Y; Guo, B H W; Papadonikolaki, E; Dimyadi, J and Hung, S N (2022) Investigating the New Zealand off-site manufacturing industry's readiness for automated compliance checking. Journal of Construction Engineering and Management, 148(12): 05022013, ISSN 0733-9364

de Feijter, F J (2023) Trust in circular design: Active stakeholder participation in Chinese and Dutch housing retrofit projects. Building Research & Information, 51(1), pp. 105-118. ISSN 0961-3218

de Wilde de Ligny, E L C (2000) Technology mapping for technology management. The development of a technology mapping methodology for the assessment of the technological capabilities and the technology status in an industry and its application for technology mapping in the sector of dwelling construction for lower -income households in urban Tanzania and Costa Rica. PhD thesis, Delft University of Technology, Netherlands.

van der Vlist, A J; Vrolijk, M H and Dewulf, G P M R (2014) On information and communication technology and production cost in construction industry: Evidence from the Netherlands. Construction Management and Economics, 32(6), pp. 641-651. ISSN 01446193

Ågren, R and Wing, R D (2014) Five moments in the history of industrialized building. Construction Management and Economics, 32(1-2), pp. 7-15. ISSN 01446193

This list was generated on Sat Aug 22 02:27:54 2026 UTC.