Items with Subject: heritage and conservation
Aalto, L; Sirola, P; Kalliomäki-Levanto, T; Lahtinen, M; Ruohomäki, V; Salonen, H and Reijula, K (2019) User-centric work environments in modular healthcare facilities. Engineering, Construction and Architectural Management, 26(6), pp. 1047-1062. ISSN 0969-9988
Abdul-Aziz, A-R (1998) Adapting procurement practices to suit a host country as a probable localization tactic. Journal of Construction Procurement, 4(1), pp. 45-58. ISSN 1358-9180
Aboagye-Nimo, E; Painting, N and Piroozfar, P (2024) Picking up where we left off: A 'temporary' safety culture. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Abounia Omran, B (2016) Application of data mining and big data analytics in the construction industry. PhD thesis, Ohio State University, USA.
Aftab, U; Hassan, M U; Ullah, F; Nasir, A R and Thaheem, M J (2026) BIM-based search and selection of construction material suppliers: A dedicated framework and prototype. Construction Innovation, 26(3), pp. 892-915. ISSN 1471-4175
Agapiou, A (2020) Factors influencing the selection of a procurement route for UK off-site housebuilding. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 3-15. ISSN 17514304
Agha, R H M and Hussein, A N (2024) Adaptation re-use of traditional cafés in Erbil, Iraq. International Journal of Building Pathology and Adaptation, 42(1), pp. 153-174. ISSN 23984708
Akande, O K (2015) Factors influencing operational energy performance and refurbishment of UK listed church buildings: towards a strategic management framework. PhD thesis, Anglia Ruskin University, UK.
Al-Fares, M A (1995) On the development of an integrated system for the automation of on-site reinforced concrete construction. PhD thesis, University of Wisconsin - Madison, USA.
Al-Hashim, A; Benkari, N and Al-Saadi, S (2024) Evaluating the sustainable features of vernacular architecture in hot-arid regions: field surveys and analysis in two vernacular houses in Al Batinah region (Oman). Architectural Engineering and Design Management, 20(5), pp. 1118-1140. ISSN 1745-2007
Al-Muqdadi, F (2020) Assessing the potentials of heritage building information modelling (HBIM) in damaged heritage reconstruction. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Al-Qawasmi, J (2016) Vernacular as a renewable resource: Toward region-specific architecture in Saudi Arabia, a case from KFUPM. Architectural Engineering and Design Management, 12(2), pp. 81-96. ISSN 1745-2007
Al-Rabady, R. (2026) Decolonising time: Vernacular villages and the politics of heritage temporality. Buildings & Cities, 7(1), pp. 740-756. ISSN 2632-6655
AlTalhoni, A; Alwashah, Z; Liu, H; Abudayyeh, O; Kwigizile, V and Kirkpatrick, K (2026) Data-driven identification of key pricing factors in highway construction cost estimation during economic volatility. International Journal of Construction Management, 26(1), pp. 152-167. ISSN 1562-3599
Alkenaidari, A A (2019) Moving toward energy efficient buildings: A growing economic challenge for Saudi Arabia. PhD thesis, University of Cincinnati, USA.
Almalki, M; Salman, B; Salem, O and Ammoury, M (2026) A decision-support framework for accelerated wastewater pipeline construction: Integrating economic, social, environmental, and technical criteria. Journal of Construction Engineering and Management, 152(3): 04025263, ISSN 0733-9364
Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.
Alqahtani, F K; Alkhaldi, M; Alsaqer, T; Abotaleb, I S; Mohamed, A G and Dirar, S (2022) A comparative assessment of advanced construction systems incorporating green concrete. Journal of Construction Engineering and Management, 148(9): 04022083, ISSN 0733-9364
Alzubi, K. M.; Alaloul, W. S.; Al Salaheen, M.; Musarat, M. A.; Baarimah, A. O. and Mushtaha, A. W. (2025) Indoor construction productivity assessment using computer vision and mask region-based convolutional neural networks. Construction Innovation, 26(5), pp. 1523-1555. ISSN 1471-4175
Amarasinghe, A A S R; Agdas, D and Dawes, L (2025) Evaluating labour productivity and profitability in precast concrete manufacturing. Engineering, Construction and Architectural Management, 32(13), pp. 148-173. ISSN 0969-9988
Ancell, D J (2007) Performance-based contracting in construction: innovation for the brave? PhD thesis, University of Reading, UK.
Arbabian, H (1998) Changes in building construction in an earthquake country. PhD thesis, University of Manchester, UK.
Aryal, A and Wilkinson, S (2020) The role of social capital in the recovery of cultural built heritage: Evidence from three heritage sites in Nepal. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 44-57. ISSN 1759-5916
Asaad, A and El-Sayegh, S M (2021) Key criteria for selecting green suppliers for construction projects in the UAE. Journal of Financial Management of Property and Construction, 26(2), pp. 201-218. ISSN 1366-4387
Aslam, M; Gao, Z and Smith, G (2021) Development of lean approaching sustainability tools (LAST) matrix for achieving integrated lean and sustainable construction. Construction Economics and Building, 21(3), pp. 176-197. ISSN 2204-9029
Atanasov, V; Greenwood, D J; Madebwe, T M and Cox, R (2023) Building time, cost and quality performance of modern methods of construction in a live research project. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Attar, A; Boudjakdji, M A; Bhuiyan, N; Grine, K; Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(4), pp. 376-391. ISSN 0969-9988
Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.
Bataglin, Fernanda Saidelles (2023) Prescriptive conceptual framework for planning and controlling engineer-to-order industrialized building systems. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.
Beard, J L (2011) Theoretical framework for determinants of A/E/C firm value, strategy and continuity: An analysis incorporating corporeal, volitional and knowledge assets. PhD thesis, Georgia Institute of Technology, USA.
Blismas, N G; Sher, W and Thorpe, A (1998) National and global multi-site projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bosch-Sijtsema, P and Gluch, P (2021) Challenging construction project management institutions: The role and agency of BIM actors. International Journal of Construction Management, 21(11), pp. 1077-1087. ISSN 1562-3599
Bowers, C T (2019) The next generation of residential construction: Adoption of green building programs, environmentally certified wood products and the transparency of environmental friendliness. PhD thesis, University of Washington, USA.
Brosque, C; Skeie, G and Fischer, M (2021) Comparative analysis of manual and robotic concrete drilling for installation hangers. Journal of Construction Engineering and Management, 147(3): 05021001, ISSN 0733-9364
Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.
Buxton, A (2010) A future in the past: Unlocking a career in Britain's built heritage. PhD thesis, Sheffield Hallam University, UK.
Calcerano, F; Thravalou, S; Martinelli, L; Alexandrou, K; Artopoulos, G and Gigliarelli, E (2024) Energy and environmental improvement of built heritage: HBIM simulation-based approach applied to nine mediterranean case-studies. Building Research & Information, 52(1-2), pp. 225-247. ISSN 0961-3218
Calvetti, D; Magalhães, P N M; Sujan, S F; Gonçalves, M C and Campos De Sousa, H J (2020) Challenges of upgrading craft workforce into Construction 4.0: Framework and agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 158-165. ISSN 17514304
Carmody, S; Spillane, J P and Clarke, N (2022) Barriers to the implementation of modular construction in Ireland: A case study from an Irish small and medium-sized enterprise perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Chai, C; De Brito, J; Gaspar, P L and Silva, A (2014) Predicting the service life of exterior wall painting: Techno-economic analysis of alternative maintenance strategies. Journal of Construction Engineering and Management, 140(3): 4013057, ISSN 0733-9364
Charlton, J; Kelly, K; Greenwood, D and Moreton, L (2021) The complexities of managing historic buildings with BIM. Engineering, Construction and Architectural Management, 28(2), pp. 570-583. ISSN 0969-9988
Chauhan, Krishna (2024) Prefabrication in construction: A systemic approach to impact and implementation. DScTech thesis, Aalto University, Finland.
Chellappa, V and Srivastava, V (2024) Science mapping approach based review of thermal comfort studies in Indian residential buildings. Journal of Engineering, Design and Technology, 22(2), pp. 297-315. ISSN 1726-0531
Chen, G; Chen, J; Tang, Y; Li, Q and Luo, X (2022) Identifying effective collaborative behaviors in building information modeling-enabled construction projects. Journal of Construction Engineering and Management, 148(6): 04022026, ISSN 0733-9364
Chen, Zhanliang (2024) Narrative carpentry: A study on conservation organisations for traditional Chinese timber structures. DDes thesis, Harvard University, USA.
Chowdhooree, I and Das, K K (2022) Indigenous knowledge of mud architecture: Experiences of surviving against multiple natural hazards. International Journal of Disaster Resilience in the Built Environment, 13(4), pp. 451-469. ISSN 1759-5916
Chritamara, S; Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(4), pp. 269-295. ISSN 1471-4175
Chritamara, S; Ogunlana, S O and Luong Bach, N (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Engineering, Construction and Architectural Management, 8(5-6), pp. 381-392. ISSN 0969-9988
Clarke, N J; Kuipers, M C and Roos, J (2020) Cultural resilience and the smart and sustainable city: Exploring changing concepts on built heritage and urban redevelopment. Smart and Sustainable Built Environment, 9(2), pp. 144-155. ISSN 2046-6099
Conejos, S; Chew, M Y L and Yung, E H K (2017) The future adaptivity of nineteenth century heritage buildings. International Journal of Building Pathology and Adaptation, 35(4), pp. 332-347.
Costa, S; Sameiro Carvalho, M; Pimentel, C and Duarte, C (2025) Conceptualizing the phenomenon of construction industrialization: linking theory and practice through a cross-sector case study. International Journal of Construction Management, 25(8), pp. 923-931. ISSN 1562-3599
Cruz, Arturo (2020) Developing a model for maintenance-focused heritage building conservation. PhD thesis, Queensland University of Technology, Australia.
Da Rocha, C G; Wijayaratna, K; Jong, K and Haller, D (2023) Examining off-site construction from a flow viewpoint. Journal of Construction Engineering and Management, 149(3): 05023001, ISSN 0733-9364
Dann, N; Hills, S and Worthing, D (2006) Assessing how organizations approach the maintenance management of listed buildings. Construction Management and Economics, 24(1), pp. 97-104. ISSN 01446193
Dike, I U and Kapogiannis, G (2014) A conceptual model for improving construction supply chain performance. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Dreschler, M (2009) Fair competition: How to apply the 'economically most advantageous tender' award mechanism in the Dutch construction industry. PhD thesis, Delft University of Technology, Netherlands.
El-Khatib, A and Salhieh, S M (2026) Interconnected success factors for offsite modular construction in developing economies: A fuzzy-DEMATEL approach. International Journal of Construction Management, 26(3), pp. 445-469. ISSN 1562-3599
El-Razek, M E A (1999) New method for construction of diaphragm walls. Journal of Construction Engineering and Management, 125(4), pp. 233-241. ISSN 0733-9364
Ellis, L; Rodriguez, S; Al-Mhdawi, M K S and Dawood, N (2024) Beyond bricks and mortar: A review of sustainable methods and their benefits in off-site timber construction for social housing in the UK. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Erbil, Y; Akincitürk, N and Acar, E (2013) Inter-organizational context of the innovation process and the role of architectural designers as system integrators: Case evidence from Turkey. Architectural Engineering and Design Management, 9(2), pp. 77-94. ISSN 1745-2007
Ertemir, D Y and Edis, E (2023) Sustaining modern heritage buildings: Visual defect categorisation guides for the general condition survey of rendered-painted facades. International Journal of Building Pathology and Adaptation, 41(3), pp. 606-624. ISSN 23984708
Falaq Assad, N; Edwards, D J; Shelbourn, M; Martek, I; Wellington Didibhuku Didibhuku, T and El-Gohary, H (2021) Comparison of modular and traditional UK housing construction: A bibliometric analysis. Journal of Engineering, Design and Technology, 19(1), pp. 164-186. ISSN 1726-0531
Fang, X; Yang, L; Zhang, C; Yang, J and Zhou, W (2025) Large diameter shafts in fractured strata: Equipment and construction procedures. Journal of Construction Engineering and Management, 151(9): 06025001, ISSN 0733-9364
Farrow, C B; Liu, J and Tatum, M C (2011) Curriculum delivery and assessment for net generation construction students. International Journal of Construction Education and Research, 7(2), pp. 109-125. ISSN 1557-8771
Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system. PhD thesis, Eindhoven University of Technology, Netherlands.
Februandari, A (2020) Authenticity in cultural built heritage: Learning from Chinese indonesians' houses. International Journal of Building Pathology and Adaptation, 38(2), pp. 262-278. ISSN 23984708
Ferreira, Thiago Lopes (2014) Vernacular architecture and contemporary production processes: Formation, experimentation and construction in a Brazilian rural settlement. PhD thesis, Universidade de São Paulo, Brazil.
Forbes, C (2018) Rebuilding Nepal: Traditional and modern approaches, building or diminishing resilience? International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 218-229. ISSN 1759-5916
Forbes, D; El-Haram, M; Horner, M; Hatton, D and Evans, A (2009) Estimating the labour demand for housing construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Foruzanmehr, A and Vellinga, M (2011) Vernacular architecture: Questions of comfort and practicability. Building Research & Information, 39(3), pp. 274-285. ISSN 0961-3218
Francis, A; Padmanabhan, V and Thomas, A (2025) A life cycle assessment-based case study analysis of the sustainability of "vernacular" versus contemporary construction techniques. Engineering, Construction and Architectural Management, 32(9), pp. 6187-6212. ISSN 0969-9988
Franco, Luiz Sergio (1992) Application of constructive rationalization guidelines for the technological development of constructive processes in unreinforced structural masonry. PhD thesis, Universidade de São Paulo, Brazil.
Frederiksen, N; Gottlieb, S C; de Gier, A; Johansen, P and Sørensen, A S (2022) Understanding the marketing department's role in the social and environmental ventures of construction companies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Gamal, A; Nashaat, B; Shahda, M M and Nosier, S R (2024) Ten questions concerning the integration of digital fabrication techniques into the architectural design process. Architectural Engineering and Design Management, 20(1), pp. 120-149. ISSN 1745-2007
Gao, J; Ren, H and Cai, W (2019) Risk assessment of construction projects in China under traditional and industrial production modes. Engineering, Construction and Architectural Management, 26(9), pp. 2147-2168. ISSN 0969-9988
Gee, S (2019) The development of an innovative, lean, mobile factory system to manufacture timber frame closed panels in temporary locations for use in the Assembly of Houses in the Affordable Rented Sector. PhD thesis, University of Liverpool, UK.
Ghaffour, W; Ouissi, M N and Velay Dabat, M A (2021) Analysis of urban thermal environments based on the perception and simulation of the microclimate in the historic city of Tlemcen. Smart and Sustainable Built Environment, 10(2), pp. 141-168. ISSN 2046-6099
Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts. PhD thesis, Syracuse University, USA.
Ginigaddara, B; Perera, S; Feng, Y and Rahnamayiezekavat, P (2022) Offsite construction skills evolution: An Australian case study. Construction Innovation, 22(1), pp. 41-56. ISSN 1471-4175
Ginigaddara, B; Perera, S; Feng, Y and Rahnamayiezekavat, P (2022) An evaluation of offsite construction skill profiles. Journal of Financial Management of Property and Construction, 27(1), pp. 16-28. ISSN 1366-4387
Ginigaddara, Buddhini (2022) Developing a skill profile prediction model for typologies of offsite construction. PhD thesis, Western Sydney University, Australia.
Giron Matute, W A (2018) Sustainability analysis for construction companies under the LEED code. PhD thesis, University of Alabama, USA.
Goodhew, S; Bird, P and Paterson, I (1997) The financial implications of using natural ventilation to reduce the levels of radon gas within an existing 'period' dwelling. Journal of Financial Management of Property and Construction, 2(2), pp. 85-104. ISSN 1366-4387
Gravina da Rocha, C; Korb, S and Sacks, R (2022) Work structuring and product design for customized repetitive projects. Construction Management and Economics, 40(7-8), pp. 526-547. ISSN 01446193
Gurdo, H (2016) Non-traditional construction management technology students: Overcoming barriers to degree completion. EdD thesis, Wilmington University (Delaware), USA.
Habibi, S (2019) Design concepts for the integration of bamboo in contemporary vernacular architecture. Architectural Engineering and Design Management, 15(6), pp. 475-489. ISSN 1745-2007
Han, Y; Fang, X; Zhao, X and Wang, L (2024) Exploring the impact of incentive policy on the development of prefabricated buildings: A scenario-based system dynamics model. Engineering, Construction and Architectural Management, 31(12), pp. 4697-4725. ISSN 0969-9988
Hassler, U (2009) Long-term building stock survival and intergenerational management: The role of institutional regimes. Building Research & Information, 37(5-6), pp. 552-568. ISSN 0961-3218
Hauer, M (2012) A game-based learning approach to building conservation education in UK undergraduate built environment degrees. PhD thesis, University of Portsmouth, UK.
Herrera-Avellanosa, D; Haas, F; Leijonhufvud, G; Brostrom, T; Buda, A; Pracchi, V; Webb, A L; Hüttler, W and Troi, A (2020) Deep renovation of historic buildings: The iea-shc task 59 path towards the lowest possible energy demand and CO2 emissions. International Journal of Building Pathology and Adaptation, 38(4), pp. 539-553. ISSN 23984708
Höök, M and Stehn, L (2008) Applicability of lean principles and practices in industrialized housing production. Construction Management and Economics, 26(10), pp. 1091-1100. ISSN 1466433X
Ibrahim Khil, Mohammad Hashim (2025) Automated construction progress monitoring of buildings through mobile mapping and as-built modeling. PhD thesis, University of New South Wales, Australia.
Innella, F; Arashpour, M and Bai, Y (2019) Lean methodologies and techniques for modular construction: Chronological and critical review. Journal of Construction Engineering and Management, 145(12): 04019076, ISSN 0733-9364
Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.
Jaafari, A; Manivong, K K and Chaaya, M (2001) Vircon: Interactive system for teaching construction management. Journal of Construction Engineering and Management, 127(1), pp. 66-75. ISSN 0733-9364
Jayawardana, Jayawardanage Janappriya (2024) Investigating the sustainability of modern construction practices focusing on prefabricated construction. PhD thesis, RMIT University, Australia.
Jin, H; Qu, X; Liu, B and Liu, C (2024) Examining the success drivers and barriers of modular building projects using qualitative comparative analysis. International Journal of Construction Management, 24(6), pp. 601-609. ISSN 1562-3599
Johnson, B T (2007) Exploring the use of virtual construction to capture knowledge and reduce waste for residential projects. PhD thesis, Colorado State University, USA.
Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Kaka, A P (1999) The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(3), pp. 256-266. ISSN 0969-9988
Kangari, R and Yoshida, T (1989) Prototype robotics in construction industry. Journal of Construction Engineering and Management, 115(2), pp. 284-301. ISSN 0733-9364
Karaz, Mahmoud Abdel Fattah Abdel Athim (2024) Construction waste management model for contractors using lean and BIM tools. PhD thesis, Universidade do Minho, Portugal.
Kayan, B A (2015) Conservation plan and "green maintenance" from sustainable repair perspectives. Smart and Sustainable Built Environment, 4(1), pp. 25-44. ISSN 2046-6099
Kedir, F; Hall, D M; Brantvall, S; Lessing, J; Hollberg, A and Soman, R K (2024) Circular information flows in industrialized housing construction: The case of a multi-family housing product platform in Sweden. Construction Innovation, 24(5), pp. 1354-1379. ISSN 1471-4175
Kedir, F N (2022) The performance and potential of industrialized construction for resource-efficient housing construction: A multi-scalar approach across product, system, and context. DSc thesis, ETH Zürich, Switzerland.
Kelly, D and Koo, H J (2024) Challenges managing large historic building renovations: Lessons learned from detroit, Michigan. Journal of Construction Engineering and Management, 150(2): 05023015, ISSN 0733-9364
Kelvin Ibrahim, M and Aliu, J O (2026) Bridging the digital divide: Strategies for successful technology implementation in the UK construction sector. International Journal of Construction Management, 26(6), pp. 1017-1032. ISSN 1562-3599
Klotz, L and Horman, M (2010) Counterfactual analysis of sustainable project delivery processes. Journal of Construction Engineering and Management, 136(5), pp. 595-605. ISSN 0733-9364
Koo, H J; Kelly, D and Deman, D (2024) Risk assessment of the challenges in the adaptive reuse of historic buildings. Journal of Construction Engineering and Management, 150(9): 04024119, ISSN 0733-9364
Koskela, L; Ferrantelli, A; Niiranen, J; Pikas, E and Dave, B (2019) Epistemological explanation of lean construction. Journal of Construction Engineering and Management, 145(2): 04018131, ISSN 0733-9364
Kouhila, M; Bahammou, Y; Lamsyehe, H; Tagnamas, Z; Moussaoui, H; Idlimam, A and Lamharrar, A (2024) Evaluating water sorption isotherms, drying kinetics and exergy performance of traditionally earth mortar drying system based on hybrid solar-electrical dryer. International Journal of Building Pathology and Adaptation, 42(5), pp. 857-880. ISSN 2398-4708
Kurul, E (2003) Re-using listed buildings through conversion: A process mapping approach. PhD thesis, University College London, UK.
Legnér, M; Leijonhufvud, G and Tunefalk, M (2020) Energy policy and conservation planning in Sweden: A longitudinal evaluation. International Journal of Building Pathology and Adaptation, 38(4), pp. 555-572. ISSN 23984708
Lewis, T (1998) Electronic data interchange in the construction industry. PhD thesis, Loughborough University, UK.
Li, X; Chen, R; Chen, W and Jim, C Y (2025) Safety-risk assessment system for prefabricated building construction in China. Engineering, Construction and Architectural Management, 32(12), pp. 8073-8096. ISSN 0969-9988
Li, H; Chan, G; Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(5), pp. 536-550. ISSN 0969-9988
Liu, W.; Feng, Z.; Hu, Y. and Luo, X. (2026) Study on the measurement of the level of construction occupational health and safety management in prefabricated building: A case study of a practical training building. Engineering, Construction and Architectural Management, 33(4), pp. 3352-3374. ISSN 0969-9988
Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Liu, L (2017) A systematic approach for major renovation of residential buildings. PhD thesis, Linköping University, Sweden.
Liu, T; Mao, Y and Lu, S (2023) Fostering participants' collaborative innovation performance in megaprojects: The effects of perceived partners' non-mediated power. Journal of Construction Engineering and Management, 149(1): 04022141, ISSN 0733-9364
Lo Prete, Matteo (2013) Synergies between management and valorization of cultural heritage through models based on BIM technologies. PhD thesis, Politecnico di Milano, Italy.
Loehlein, G (2000) Role of the reichsforschungsgesellschaft fuer wirtschaftlichkeit im bau - und wohnungswesen e.v in supporting non-traditional construction methods in German public housing in the late 1920s. PhD thesis, Cardiff University, UK.
Loosemore, M and Hughes, K (1998) Emergency systems in construction contracts. Engineering, Construction and Architectural Management, 5(2), pp. 189-198. ISSN 0969-9988
Lopez, J; Bhandari, S; Perry, L; Ayer, S K; Hallowell, M R and Jones, M (2025) Analyzing the impact of virtual reality and haptic feedback on the safety skills of construction workers. Journal of Construction Engineering and Management, 151(8): 04025110, ISSN 0733-9364
Lu, Y and Zhu, Y (2021) Integrating hoisting efficiency into construction site layout plan model for prefabricated construction. Journal of Construction Engineering and Management, 147(10): 04021130, ISSN 0733-9364
Luigi, Guzzoni (2022) Construction management of cultural heritage. Conservation of cultural heritage during its construction site stage. Building information modelling supporting on site information collection and management for cost control. PhD thesis, Politecnico di Milano, Italy.
Luo, Y; Hu, D; Yao, Q; Wang, J; Chen, X; Li, H and Shi, M (2025) Blasting and sliding parameter optimization for efficient autonomous construction rock debris sliding transportation in an inclined shaft. Journal of Construction Engineering and Management, 151(11): 04025162, ISSN 0733-9364
Lynch, S and Proverbs, D G (2020) How adaption of historic listed buildings affords access. International Journal of Building Pathology and Adaptation, 38(4), pp. 589-605. ISSN 23984708
Mackee, J; Askland, H H and Askew, L (2014) Recovering cultural built heritage after natural disasters: A resilience perspective. International Journal of Disaster Resilience in the Built Environment, 5(2), pp. 202-212. ISSN 1759-5916
Mandala, R S K and Nayaka, R R (2025) A state of art review on time, cost and sustainable benefits of modern construction techniques for affordable housing. Construction Innovation, 25(2), pp. 363-380. ISSN 1471-4175
Mansfield, J R (2008) The ethics of conservation: Some dilemmas in cultural built heritage projects in England. Engineering, Construction and Architectural Management, 15(3), pp. 270-281. ISSN 0969-9988
Mansuri, L; Udeaja, C; Trillo, C; Kwasi, G; Patel, D; Jha, K; Makore, C B and Gupta, S (2019) Scientometric analysis and mapping of digital technologies used in cultural heritage field. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Mansuri, L E and Patel, D A (2022) Artificial intelligence-based automatic visual inspection system for built heritage. Smart and Sustainable Built Environment, 11(3), pp. 622-646. ISSN 2046-6099
Mao, Sheng (2016) Design and optimization of tunnel guidance systems for tunneling subject to constrained space and limited visibility. PhD thesis, University of Alberta, Canada.
Mararo, I. M.; Babafemi, A. J. and Aigbavboa, C. (2026) Towards understanding the perceptions of 3D construction printing in Kenya. International Journal of Construction Management, 26(7), pp. 1320-1340. ISSN 1562-3599
Marzouk, M; ElSharkawy, M; Elsayed, P and Eissa, A (2020) Resolving deterioration of heritage building elements using an expert system. International Journal of Building Pathology and Adaptation, 38(5), pp. 721-735. ISSN 23984708
McCarney, M P (2017) Interface management of offsite bathroom construction: process- and people-factors. PhD thesis, Loughborough University, UK.
McKay, L J; Gibb, A G F; Haslam, R and Pendlebury, M (2003) The development of an accident causal model for off-site production in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Meiling, J and Johnsson, H (2008) Feedback in industrialised housing: Why does it not happen? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Miller, J P (2020) Post-disaster recovery through the evolution of the Lakou, a traditional settlement pattern. International Journal of Disaster Resilience in the Built Environment, 11(1), pp. 3-14. ISSN 1759-5916
Mokhlesian, S and Holmén, M (2012) Business model changes and green construction processes. Construction Management and Economics, 30(9), pp. 761-775. ISSN 1466433X
Moradi, S and Kähkönen, K (2022) Success in collaborative construction through the lens of project delivery elements. Built Environment Project and Asset Management, 12(6), pp. 973-991. ISSN 2044-124X
Moradi, S; Kähkönen, K; Klakegg, O J and Aaltonen, K (2021) Profile of project managers' competencies for collaborative construction projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Motawa, I A; Price, A D F and Sher, W (1999) Implementing construction innovations. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Moyo, Cynthia; Moyo, Tirivavi and Mudombo, Mabel Vongai (2026) Integrating sustainable materials into construction: A review of Zimbabwe’s model building by-laws. Journal of Construction Business and Management, 8(S1), pp. 99-110. ISSN 2521-0165
Mulholland, S M (2021) Incentivizing effort in highly collaborative construction and design teams. PhD thesis, University of Colorado at Denver, USA.
Nasirian, A; Arashpour, M; Abbasi, B; Zavadskas, E K and Akbarnezhad, A (2019) Skill set configuration in prefabricated construction: Hybrid optimization and multicriteria decision-making approach. Journal of Construction Engineering and Management, 145(9): 04019050, ISSN 0733-9364
Ngowi, A B (1997) A hybrid approach to house construction: a case study in Botswana. Building Research & Information, 25(3), pp. 142-147. ISSN 0961-3218
Nguyen, T D H N; Park, S; Jeong, J and Ahn, Y (2026) Post occupancy evaluation of the relocatable modular construction method for temporary educational facilities. Engineering, Construction and Architectural Management, 33(1), pp. 785-809. ISSN 0969-9988
Norazman, N; Salleh, N M; Mohd Nashruddin, S N A and Wan Ismail, W N (2025) Strategic planning of sustainable maintenance in heritage school buildings: Malaysia perspectives. International Journal of Building Pathology and Adaptation, 43(3), pp. 440-462. ISSN 2398-4708
Nwachukwu, C V; Udeaja, C; Chileshe, N and Okere, C E (2017) The critical success factors for stakeholder management in the restoration of built heritage assets in the UK. International Journal of Building Pathology and Adaptation, 35(4), pp. 304-331.
O'Gorman, Sean Thomas (2024) A project management maturity model for precast concrete manufacturers. PhD thesis, University of Adelaide, Australia.
Obiaigwe, Innocent Onyeka (2025) Robotizing safety: Prospects and barriers of robotic technology adoption for construction injury prevention in the UK. PhD thesis, University of Salford, UK.
Ock, J-H (1998) Integrated decision process model (idepm) for the development of the build-operate-transfer (bot) highway project proposals. PhD thesis, University of Colorado at Boulder, USA.
Ofek, S (2021) Stimulating key stakeholders to promote residential green building in Israel. PhD thesis, University of Haifa, Israel.
Olimat, H.; Abudayyeh, O.; Liu, H. and Alwashah, Z. (2026) Safety performance evaluation model for off-site construction through the integration of key leading and lagging factors. Journal of Construction Engineering and Management, 152(6): 04026077, ISSN 0733-9364
Olukayode, Olukemi Temitope (2020) Sustainable construction compliance: Recommending a transformational leader for sustainability policies supervision in the United States construction industry. DBA thesis, Northcentral University, USA.
Oyegoke, A S; McDermott, P; Aouad, G and Cleary, M (2009) Skill competency development strategies by a contractor. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(3), pp. 121-130. ISSN 17514312
Ozorhon, B. and Karakurt, C. (2026) Navigating retail construction projects in Türkiye: Critical enablers and barriers. Engineering, Construction and Architectural Management, pp. 1-20. ISSN 0969-9988
Ozorhon, B. and Karakurt, C. (2026) Navigating retail construction projects in Türkiye: Critical enablers and barriers. Engineering, Construction and Architectural Management, pp. 1-20. ISSN 0969-9988
Palaneeswaran, E and Kumaraswamy, M M (2000) Contractor selection for design/build projects. Journal of Construction Engineering and Management, 126(5), pp. 331-339. ISSN 0733-9364
Paneru, S; Suh, S; Seo, W and Rausch, C (2024) Evaluating the decarbonization potential of industrialized construction: A review of the current state, opportunities, and challenges. Journal of Construction Engineering and Management, 150(9): 03124005, ISSN 0733-9364
Paullin, R J (1977) Construction management: Implications for intermediate school district boards of education and administrators in Michigan. PhD thesis, Michigan State University, USA.
Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies. ArchD thesis, University of Michigan, USA.
Pellegrino, R; Vajdic, N and Carbonara, N (2013) Real option theory for risk mitigation in transport PPPs. Built Environment Project and Asset Management, 3(2), pp. 199-213. ISSN 2044-124X
Pham, V H S and Pham, D H (2025) A cutting-edge approach to prefabricated construction site layouts using multi-objective artificial hummingbird algorithm solution. International Journal of Construction Management, 25(16), pp. 2063-2081. ISSN 1562-3599
Phelps, A F and Horman, M J (2010) Ethnographic theory-building research in construction. Journal of Construction Engineering and Management, 136(1), pp. 58-65. ISSN 0733-9364
Pietroforte, R and Stefani, T P (2004) Asce journal of construction engineering and management: Review of the years 1983-2000. Journal of Construction Engineering and Management, 130(3), pp. 440-448. ISSN 0733-9364
Power, W; Sinnott, D and Lynch, P (2022) Accelerating construction project delivery using agile's integrated system of principles and methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Premraj, P (2017) Assessment of project controls for shutdowns/turnarounds/outages. PhD thesis, University of Alabama, USA.
Pryke, Stephen David (2002) UK construction in transition: developing a social network approach to the evaluation of new procurement and management strategies. PhD thesis, University College London, UK.
Purushothaman, A and Thirumaran, K (2021) Evaluating the climate-responsive design strategies of vernacular buildings in konearirajapuram village, nagappattinam, India. International Journal of Building Pathology and Adaptation, 39(2), pp. 175-196. ISSN 23984708
Påsse, D; Disney, O; Roupé, M and Johansson, M (2022) Cost-estimation in construction: Building information modelling versus total BIM. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Rafi, M M; Lodi, S H; Ahmed, M; Kumar, A and Verjee, F (2016) Development of building inventory for Northern Pakistan for seismic risk reduction. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 501-520. ISSN 1759-5916
Rambaldi, A N (1992) A regional market model for construction aggregate materials. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Rispoli, M and Organ, S (2019) The drivers and challenges of improving the energy efficiency performance of listed pre-1919 housing. International Journal of Building Pathology and Adaptation, 37(3), pp. 288-305. ISSN 23984708
Riza, R (2014) Integration of wind catchers in modern residential buildings in the uae as a means of providing thermal comfort. PhD thesis, British University in Dubai, UAE.
Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175
Rogan, A (1999) Inter-organisational relationships in the construction process. PhD thesis, University of the West of England, Bristol, UK.
Rojas, E M and Mukherjee, A (2005) General-purpose situational simulation environment for construction education. Journal of Construction Engineering and Management, 131(3), pp. 319-329. ISSN 0733-9364
Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.
Rwelamila, P D; Talukhaba, A A and Ngowi, A B (1999) Tracing the African project failure syndrome: The significance of 'ubuntu'. Engineering, Construction and Architectural Management, 6(4), pp. 335-346. ISSN 0969-9988
Ryan, E C (2001) An economic analysis of the standard construction contract. PhD thesis, King's College London, UK.
Sacks, R; Seppänen, O; Priven, V and Savosnick, J (2017) Construction flow index: A metric of production flow quality in construction. Construction Management and Economics, 35(1-2), pp. 45-63. ISSN 01446193
Sadafi, N and Sharifi, M (2019) A study of the concept of Iranian traditional architecture in bazaars and shopping centres. Journal of Construction in Developing Countries, 23(2), pp. 151-165. ISSN 1823-6499
Sahebzadeh, S; Dalvand, Z; Sadeghfar, M and Heidari, A (2020) Vernacular architecture of Iran's hot regions; elements and strategies for a comfortable living environment. Smart and Sustainable Built Environment, 9(4), pp. 573-593. ISSN 2046-6099
Salcedo Rahola, T B (2015) Integrated project delivery methods for energy renovation of social housing. PhD thesis, Delft University of Technology, Netherlands.
Samarasingha, D.; Ranadewa, K. A. T. O. and Parameswaran, A. (2026) Extended reality-integrated construction progress monitoring in the construction industry. Journal of Engineering, Design and Technology, 24(5), pp. 1135-1155. ISSN 1726-0531
Sardén, Y and Engström, S (2010) Modern methods of construction: A solution for an industry characterized by uncertainty? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Savaşkan, M O and Özener, O Ö (2023) H-BIM applications for vernacular architecture: A historic rural house case study in bursa, Turkey. Engineering, Construction and Architectural Management, 30(9), pp. 3997-4017. ISSN 0969-9988
Schoenefeldt, H (2019) The House of Commons: A precedent for post-occupancy evaluation. Building Research & Information, 47(6), pp. 635-665. ISSN 0961-3218
Shahzad, W M; Reddy, S M; Kahandawa, R and Rotimi, J O B (2024) Benefits, constraints and enablers of modular offsite construction (MOSC) in New Zealand high-rise buildings. Engineering, Construction and Architectural Management, 31(10), pp. 4042-4061. ISSN 0969-9988
Shaker, R A; Elbeltagi, E; Motawa, I; Elmasoudi, I and Elnabwy, M T (2024) Social network analysis for identifying the significant drivers of off-site construction adoption in Egypt. Built Environment Project and Asset Management, 14(4), pp. 607-625. ISSN 2044-124X
Shang, G; Pheng, L S and Fai, B P K (2025) Receptiveness of mass-engineered timber (MET) residential buildings among young stakeholders. Smart and Sustainable Built Environment, 14(3), pp. 696-714. ISSN 2046-6099
Shang, G; Pheng, L S and Zhong Xia, R L (2024) Adoption of smart contracts in the construction industry: An institutional analysis of drivers and barriers. Construction Innovation, 24(5), pp. 1401-1421. ISSN 1471-4175
Shaurette, M (2011) Safety and health education for demolition and reconstruction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 129-138. ISSN 17514312
Shen, Y; Lin, Z and Wang, Z (2022) Single-side accumulative jacking construction method for large-span arched latticed shells. Journal of Construction Engineering and Management, 148(12): 06022001, ISSN 0733-9364
Shen, Z and Wu, J (2025) Multiobjective ant colony system algorithm for component-level construction schedule optimization. Journal of Construction Engineering and Management, 151(3): 04025002, ISSN 0733-9364
Shou, T.; Pan, Y. and Zhao, B. (2026) Vernacular ecological construction: A diagrammatic exploration on the composition modes of spatial-landscape in huizhou courtyard dwellings. Architectural Engineering and Design Management, 22(2), pp. 446-470. ISSN 1745-2007
Simpeh, E K; Smallwood, J J; Ahadzie, D K and Mensah, H (2023) Analytical taxonomy of challenges to the implementation of green building projects in South Africa. International Journal of Construction Management, 23(2), pp. 286-296. ISSN 1562-3599
Simukonda, W T (2024) Modelling offsite construction to control hazards and direct cost of accidents. PhD thesis, Nelson Mandela University, South Africa.
Skoura, A and Madden, A (2023) Assessing the social values of historic shopping arcades: Building biographies. Buildings & Cities, 4(1), pp. 690-707. ISSN 2632-6655
Song, Y; Liu, C and Langston, C (2006) Extending construction linkage measures by the consideration of the impact of capital. Construction Management and Economics, 24(11), pp. 1207-1216. ISSN 1466433X
Sutton, R M (2019) The development of a sustainable construction design process. PhD thesis, University of Liverpool, UK.
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Tennant, S; McCarney, M and Tong, M K L (2012) Re-engineering the construction supply chain: Transferring on-site activity off-site. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Thakhtravachi, M (2017) Tacit knowledge integration within the traditional construction procurement system. PhD thesis, University of Salford, UK.
Thuesen, C and Hvam, L (2011) Efficient on-site construction: Learning points from a German platform for housing. Construction Innovation, 11(3), pp. 338-355. ISSN 1471-4175
Tunefalk, M; Legner, M and Leijonhufvud, G (2020) Long-term effects of additional insulation of building façades in Sweden: Towards a holistic approach. International Journal of Building Pathology and Adaptation, 38(2), pp. 374-385. ISSN 23984708
Vakhitova, T V (2015) Rethinking conservation: Managing cultural heritage as an inhabited cultural landscape. Built Environment Project and Asset Management, 5(2), pp. 217-228. ISSN 2044-124X
Vatankhah, M; Vakilinezhad, R; Zakeri, S M H and Fattahi, K (2024) Optimizing energy and daylight performance of vernacular dwellings for contemporary architecture: A parametric analysis. Architectural Engineering and Design Management, 20(6), pp. 1795-1814. ISSN 1745-2007
Wang, K; Guo, F; Zhang, C; Hao, J and Wang, Z (2025) Unlocking determinants of smart construction: An integrated model of utaut2, ttf, and perceived risk for IoT acceptance in AEC industry. Engineering, Construction and Architectural Management, 32(8), pp. 5394-5428. ISSN 0969-9988
Wang, L.; Yuan, J.; Chen, Y.; Wan, X. and Huang, G. (2026) Intelligent construction benefits the public: Evidence from the opinion analysis on social media. Engineering, Construction and Architectural Management, 33(3), pp. 2176-2199. ISSN 0969-9988
Wang, Yiheng (2023) Vision-assisted behavior-based construction safety: Integrating computer vision and natural language processing. PhD thesis, University of Alberta, Canada.
Wise, F; Moncaster, A and Jones, D (2021) Rethinking retrofit of residential heritage buildings. Buildings & Cities, 2(1), pp. 495-517. ISSN 2632-6655
Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.
Worthing, D and Organ, S (2020) Conservation management plans: An examination of obstacles to, and opportunities for, producing an effective management tool. International Journal of Building Pathology and Adaptation, 38(4), pp. 573-588. ISSN 23984708
Wuni, I Y and Shen, G Q (2022) Towards a decision support for modular integrated construction: An integrative review of the primary decision-making actors. International Journal of Construction Management, 22(5), pp. 929-948. ISSN 1562-3599
Wuni, I Y; Shen, G Q; Ogungbile, A J and Ayitey, J Z (2022) Four-pronged decision support framework for implementing industrialized construction projects. Construction Innovation, 22(2), pp. 263-283. ISSN 1471-4175
Wuni, I Y; Shen, G Q; Osei-Kyei, R and Agyeman-Yeboah, S (2022) Modelling the critical risk factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2013-2026. ISSN 1562-3599
Wuni, I Y; Shen, G Q and Saka, A B (2023) Computing the severities of critical onsite assembly risk factors for modular integrated construction projects. Engineering, Construction and Architectural Management, 30(5), pp. 1864-1882. ISSN 0969-9988
Yakub, H (1992) Buildings at risk registers: Their influence in reducing risk of dilapidation. PhD thesis, Oxford Brookes University, UK.
Yang, Z.; Lu, W.; Wu, L. and Xu, J. (2026) Analysis of workflow variability in modular integrated construction manufacturing using cooperative game theory. Journal of Construction Engineering and Management, 152(8): 04026115, ISSN 0733-9364
Yang, X L (2010) Research on general contracter and subcontractor cooperative management in construction. PhD thesis, Harbin Institute of Technology, China.
Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499
Zaryoun, M; Hosseini, M and Soleymani, K (2022) Sustainable architecture and earthquake resilience of vernacular zegalli houses in Northern Iran. Engineering, Construction and Architectural Management, 29(2), pp. 1061-1085. ISSN 0969-9988
Zhang, S; Zhong, B; Wu, H; Tang, B and Sepasgozar, S M E (2026) Impact of industry 4.0 digital technologies on optimal construction strategies: Owner preference perspective on construction service perception and unreliability costs. Journal of Construction Engineering and Management, 152(1): 04025222, ISSN 0733-9364
Zhang, L (2022) Risk management framework to guide off-site manufacturing process: a Chinese perspective. PhD thesis, University of Strathclyde, UK.
Zhao, J; Cao, Y and Xiang, Y (2024) Pose estimation method for construction machine based on improved alphapose model. Engineering, Construction and Architectural Management, 31(3), pp. 976-996. ISSN 0969-9988
Zolghadr, Ali (2023) Innovative offsite construction uptake in the housebuilding sector: A systemic approach to economic justifiability for volume builders. PhD thesis, RMIT University, Australia.
da Rocha, C G and Kemmer, S (2018) Integrating product and process design in construction. Construction Management and Economics, 36(9), pp. 535-543. ISSN 01446193
jadidoleslami, S; Saghatforoush, E and Zare Ravasan, A (2021) Constructability obstacles: An exploratory factor analysis approach. International Journal of Construction Management, 21(3), pp. 312-325. ISSN 1562-3599
Up a level