Items with Subject: financial and cost management
Abad, F and Naeni, L M (2020) A hybrid framework to assess the risk of change in construction projects using fuzzy fault tree and fuzzy event tree analysis. International Journal of Construction Management, 22(12), pp. 2385-2397. ISSN 1562-3599
Abanomi, W M (2005) Environmental design of prototype school buildings in hot, arid regions with special reference to Riyadh, Saudi Arabia. PhD thesis, Cardiff University, UK.
Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364
Abbasi, M H (2024) Phasing out fossil fuel heating in UK homes: A multi-dimensional framework for sustainability assessment of alternatives and their lifecycle implications. PhD thesis, Liverpool John Moores University, UK.
Abd El-Razek, M E and Basha, I M (2001) Constructability improvement of bridges using stepping formwork. Journal of Construction Engineering and Management, 127(3), pp. 206-213. ISSN 0733-9364
Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599
Abdel-Hamid, M and Abdelhaleem, H M (2023) Project cost control using five dimensions building information modelling. International Journal of Construction Management, 23(3), pp. 405-409. ISSN 1562-3599
Abdel-Hamid, M and Mohamed Abdelhaleem, H (2022) Impact of poor labor productivity on construction project cost. International Journal of Construction Management, 22(12), pp. 2356-2363. ISSN 1562-3599
Abdel-Razek, R H (1987) Computerised analyses of estimating inaccuracy and tender variability: causes, evaluation and consequences. PhD thesis, Loughborough University, UK.
Abdel-Razek, R H and McCaffer, R (1987) A change in the UK construction industry structure: Implications for estimating. Construction Management and Economics, 5(3), pp. 227-242. ISSN 01446193
Abdel-Wahab, M S; Dainty, A R J and Ison, S G (2006) How productive is the construction industry? In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Abdelalim, A M; Salem, M; Al-Sabah, R; Said, S O; ElShafei, H M and Galal Badawy, M (2025) Optimizing claim management process groups to enhance construction project success. International Journal of Construction Management, 25(13), pp. 1583-1595. ISSN 1562-3599
Abdelaty, A; Jeong, H D; Dannen, B and Todey, F (2016) Enhancing life cycle cost analysis with a novel cost classification framework for pavement rehabilitation projects. Construction Management and Economics, 34(10), pp. 724-736. ISSN 0144-6193
Abdelaty, A F A (2017) Data-driven algorithms for enhanced transportation infrastructure asset management. PhD thesis, Iowa State University, USA.
Abdelghafar, A (2024) Identifying challenges, best practices, and potential solutions to NYCSCA project delays. DBA thesis, Touro University Worldwide, USA.
Abdelkader, E M; Moselhi, O; Marzouk, M and Zayed, T (2021) Integrative evolutionary-based method for modeling and optimizing budget assignment of bridge maintenance priorities. Journal of Construction Engineering and Management, 147(9): 04021100, ISSN 0733-9364
Abdelkhalek, S; Zayed, T and Eltoukhy, A E E (2025) Multifaceted optimization for bridge inspection process. Journal of Construction Engineering and Management, 151(5): 04025034, ISSN 0733-9364
Abdelkhalek, Sherif Ibrahim Farag Mohamed (2022) Managing the inspection process of concrete bridge decks. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599
Abdelmohsen, A Z (2016) Optimizing the construction planning of highway work zones. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Abdelmohsen, A Z and El-Rayes, K (2016) Optimal trade-offs between construction cost and traffic delay for highway work zones. Journal of Construction Engineering and Management, 142(7): 5016004, ISSN 0733-9364
Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects. DEng thesis, George Washington University, USA.
Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues. PhD thesis, KTH Royal Institute of Technology, Sweden.
Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029
Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects. PhD thesis, Oklahoma State University, USA.
Abdou, A; Lewis, J and Alzarooni, S (2004) Modelling risk for construction cost estimating and forecasting: A review. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Abdou, A; Lewis, J and Radaideh, M (2003) An internet-based decision support system for healthcare project appraisal: A conceptual proposal. Construction Innovation, 3(3), pp. 145-155. ISSN 1471-4175
Abdul-Lateef, O A (2010) Quantitative analysis of criteria in university building maintenance in Malaysia. Construction Economics and Building, 10(3), pp. 51-61. ISSN 2204-9029
AbdulAzeez, A D; Etubi, U and Umar, B (2019) An assessment of multi-skilling in addressing skills shortage in Nigerian construction firms. African Journal of Built Environment Research, 3(1), pp. 1-13. ISSN 2414-0236
Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.
Abdullah, A (2003) Intelligent selection of demolition techniques. PhD thesis, Loughborough University, UK.
Abdullah, R Z (1988) Integrated systems for site management. PhD thesis, Loughborough University, UK.
Abdullahi, I (2000) Development of a funding model for allocating capital grants to the federal universities in Nigeria. PhD thesis, Abertay University, UK.
Abdullatif, M I (1992) A system for quality-related costs for construction projects. PhD thesis, University of Kansas, USA.
Abhulimen, P E (2024) The influence of information-sharing and trust on competitiveness and organizational performance in construction supply chain management. DBA thesis, Keiser University, USA.
Abidin, N Z (2005) Using value management to improve the consideration of sustainability within construction. PhD thesis, Loughborough University, UK.
Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.
Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.
Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988
Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.
Abotaleb, I S and El-Adaway, I H (2017) Construction bidding markup estimation using a multistage decision theory approach. Journal of Construction Engineering and Management, 143(1): 04016079, ISSN 0733-9364
AbouRizk, S M and Wales, R J (1997) Combined discrete-event/continuous simulation for project planning. Journal of Construction Engineering and Management, 123(1), pp. 11-20. ISSN 0733-9364
Abouelkhier, N; Shawky, D and Marzouk, M (2022) Evaluating distance perception for architecture design alternatives in immersive virtual environment: A comparative study. Construction Innovation, 22(2), pp. 205-221. ISSN 1471-4175
Abourizk, S; Knowles, P and Hermann, U R (2001) Estimating labor production rates for industrial construction activities. Journal of Construction Engineering and Management, 127(6), pp. 502-511. ISSN 0733-9364
Abourizk, S and Shi, J (1994) Automated construction-simulation optimization. Journal of Construction Engineering and Management, 120(2), pp. 374-385. ISSN 0733-9364
Abourizk, S M and Dozzi, S P (1993) Application of computer simulation in resolving construction disputes. Journal of Construction Engineering and Management, 119(2), pp. 355-373. ISSN 0733-9364
Abourizk, S M; Halpin, D W and Wilson, J R (1991) Visual interactive fitting of beta distributions. Journal of Construction Engineering and Management, 117(4), pp. 589-605. ISSN 0733-9364
Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364
Aboushiwa, M A A (2000) Promoter briefing on the procurement and selection of contract strategy offering the best value for money. PhD thesis, University of Manchester, UK.
Abraham, D (2011) Development of a true-cost concept for renewal of municipal underground pipeline systems. PhD thesis, University of Texas at Arlington, USA.
Abu Dabous, S; Zadeh, T and Ibrahim, F (2024) A failure mode, effects and criticality analysis-based method for formwork assessment and selection in building construction. International Journal of Building Pathology and Adaptation, 42(5), pp. 1019-1040. ISSN 2398-4708
Abu Hanipah, A F F and Tahar, K N (2018) Development of the 3D dome model based on a terrestrial laser scanner. International Journal of Building Pathology and Adaptation, 36(2), pp. 122-136. ISSN 23984708
Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria. PhD thesis, University of California, Berkeley, USA.
Abu-Mahfouz, E; Al-Dahidi, S; Gharaibeh, E and Alahmer, A (2025) A novel feature engineering-based hybrid approach for precise construction cost estimation using fuzzy-AHP and artificial neural networks. International Journal of Construction Management, 25(15), pp. 1800-1810. ISSN 1562-3599
Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.
Abubakar, A (1992) A quantitative approach to cost monitoring and control of construction projects. PhD thesis, Loughborough University, UK.
Abudayyeh, O; Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of trends in construction research: 1985-2002. Journal of Construction Engineering and Management, 130(3), pp. 433-439. ISSN 0733-9364
Abudu, H. D.; Mewomo, M. C.; Adjei, K. O. and Bondinuba, F. K. (2026) An emergency response framework for improving crisis management in facilities: PLS-SEM approach. International Journal of Disaster Resilience in the Built Environment, ISSN 1759-5908
Abudu, Haruna Domanamwin; Mewomo, Cecilia Modupe; Adjei, Kofi Owusu and Bondinuba, Francis Kwesi (2026) The influence of technical and non-technical emergency response systems on infrastructure resilience. Journal of Construction Business and Management, 8(S1), pp. 30-47. ISSN 2521-0165
Abujnah, M S (2010) Towards a risk management framework for Libyan house-building projects. PhD thesis, University of Salford, UK.
AbulHassan, H S (2001) A framework for applying concurrent engineering principles to the construction industry. PhD thesis, Pennsylvania State University, USA.
Adafin, J; Rotimi, J O B and Wilkinson, S (2015) Why do the design stage elemental cost plan and final tender sum differ in New Zealand? Journal of Financial Management of Property and Construction, 20(2), pp. 116-131. ISSN 1366-4387
Adafin, J; Rotimi, J O B and Wilkinson, S (2016) Risk impact assessments in project budget development: Architects' perspectives. Architectural Engineering and Design Management, 12(3), pp. 189-204. ISSN 1745-2007
Adafin, J; Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(1), pp. 13-28. ISSN 1562-3599
Adafin, J; Rotimi, J O B; Wilkinson, S and Mbachu, J (2019) An assessment of risk factors impacting budget variability in New Zealand commercial construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Adam, A; Josephson, P-E B and Lindahl, G (2017) Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction and Architectural Management, 24(3), pp. 393-406. ISSN 0969-9988
Adams, F K (2004) The management of risks in international infrastructural projects. PhD thesis, University of Edinburgh, UK.
Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: An investigation. Construction Management and Economics, 24(1), pp. 81-96. ISSN 01446193
Adams, Olugboyega A (1993) Management training needs of Nigerian indigenous contractors and their preferred training delivery systems. PhD thesis, University College London, UK.
Ade, R and Rehm, M (2020) Reaching for the stars: Green construction cost premiums for homestar certification. Construction Management and Economics, 38(6), pp. 570-580. ISSN 01446193
Adebisi, E O; Alao, O O and Ojo, S O (2020) Assessment of early warning signs predisposing building projects to failure in Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1403-1423. ISSN 1726-0531
Adedokun, O; Egbelakin, T and Omotayo, T (2024) Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 66-74. ISSN 1562-3599
Adegoke, A.; Akanmu, A. and Terreno, S. (2026) Aligning visual data practices with construction decision making: Delphi-based investigation. Journal of Construction Engineering and Management, 152(8): 04026119, ISSN 0733-9364
Adekanye, O G (2019) Evaluation of building policies, programs, and potential for energy efficiency in the United States. PhD thesis, Carnegie Mellon University, USA.
Adekunle, O O (2019) A linear programming-based optimization model to address skilled labor shortages through strategic investments in the construction industry. DEng thesis, Morgan State University, USA.
Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364
Adeli, H and Wu, M (1998) Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, 124(1), pp. 18-23. ISSN 0733-9364
Adepu, N; Kermanshachi, S; Pamidimukkala, A and Nwakpuda, E (2025) An analytical approach to understanding construction cost overruns during COVID-19. Smart and Sustainable Built Environment, 14(6), pp. 1780-1794. ISSN 2046-6099
Adepu, N (2023) Analysis of the impact of COVID-19 on construction cost and schedule overruns. PhD thesis, University of Texas at Arlington, USA.
Adesanya, A; Misra, S; Maskeliunas, R and Damasevicius, R (2021) Prospects of ocean-based renewable energy for West africa's sustainable energy future. Smart and Sustainable Built Environment, 10(1), pp. 37-50. ISSN 2046-6099
Adesi, M; Owusu-Manu, D G and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(3), pp. 458-474. ISSN 0969-9988
Adeyemi, O and Oke, A (2022) Factors affecting mentoring of professionals in construction firms: Nigerian quantity surveyors' perspective. International Journal of Construction Management, 22(12), pp. 2300-2307. ISSN 1562-3599
Adigbo, F A (2020) Stakeholder engagement and construction project performance in Ghana. PhD thesis, Northcentral University, USA.
Adinyira, E; Agyekum, K; Manu, P; Mahamadu, A M and Olomolaiye, P (2022) Lessening procurement deviations using procurement post reviews: Evidence from Ghana. Journal of Financial Management of Property and Construction, 27(2), pp. 199-219. ISSN 1366-4387
Adjei, K O (2020) A model for predicting cost control practice in the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.
Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects. PhD thesis, George Washington University, USA.
Adu Gyamfi, T; Aigbavboa, C O and Thwala, W D (2024) Risk resources management influence on public-private partnership risk management in construction industry: Confirmatory factor analysis approach. Journal of Engineering, Design and Technology, 22(5), pp. 1544-1569. ISSN 1726-0531
Adul-Hamid, R (1996) Construction duration prediction using neural network methodology. PhD thesis, University of Manchester, UK.
Afetornu, C (2011) The influence of estimator attitude on project cost reliability. PhD thesis, Loughborough University, UK.
Afetornu, C and Edum-Fotwe, F T (2005) Characterising project contingency budget in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Afetornu, C; Edum-Fotwe, F T and McCaffer, R (2006) Estimating budget variability for road projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Aflatooni, Mehran (2015) Synthetic rating system for railway bridge management. PhD thesis, Queensland University of Technology, Australia.
Afzal, F; Yunfei, S; Sajid, M and Afzal, F (2020) Integrated priority decision index for risk assessment in chaos: Cost overruns in transport projects. Engineering, Construction and Architectural Management, 27(4), pp. 825-849. ISSN 0969-9988
Agboola Abdulazeez, S; Faruq, M Y; Kolawole, M A; Abdulraheem, A A; Aliyu, H D and Zulfat, M O (2025) Impact of consultant performance indicators on project success in public construction projects. Journal of Construction Business and Management, 7(2), pp. 16-32.
Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects. PhD thesis, Northumbria University, UK.
Agha, R H M (2016) The role of intelligent systems in traditional courtyard houses in Baghdad, Iraq. PhD thesis, University of Newcastle upon Tyne, UK.
Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364
Aghajamali, K; Metvaei, S; Suliman, A; Lei, Z and Chen, Q (2025) Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes. Construction Management and Economics, 43(5), pp. 340-359. ISSN 0144-6193
Aghimien, D O; Aigbavboa, C O and Oke, A E (2020) Critical success factors for digital partnering of construction organisations: a Delphi study. Engineering, Construction and Architectural Management, 27(10), pp. 3171-3188. ISSN 0969-9988
Aghimien, E I and Li, D H W (2022) Application of luminous efficacies for daylight illuminance data generation in subtropical Hong Kong. Smart and Sustainable Built Environment, 11(2), pp. 271-293. ISSN 2046-6099
Aguocha, T (2023) Best practices for cost monitoring and control in construction projects: An exploratory case study. DBA thesis, National University, USA.
Agyefi-Mensah, S; Kpamma, Z E and Hagan, D E (2020) Residential adaptations as users' tacit means of communicating spatial needs in housing design: A case study. Journal of Engineering, Design and Technology, 18(6), pp. 1593-1613. ISSN 1726-0531
Agyefi-Mensah, S; Kpamma, Z E and Hagan, D E (2022) Stair step geometry compliance with standard specifications for safety and usability: A study of selected university buildings in Ghana. International Journal of Building Pathology and Adaptation, 40(1), pp. 20-39. ISSN 23984708
Agyekum, B; Kissi, E; Yamoah Agyemang, D and Badu, E (2018) Examining barriers for the utilization of non-traditional cost estimating models in developing countries: Ghanaian quantity surveyors' perspectives. Journal of Engineering, Design and Technology, 16(6), pp. 814-827. ISSN 1726-0531
Agyekum, K; Adinyira, E and Amudjie, J (2021) Ethical misconducts within the invitation to tender and tender evaluation and award stages of construction contracts in Ghana. Journal of Engineering, Design and Technology, 19(5), pp. 1101-1123. ISSN 1726-0531
Agyekum, K; Goodier, C and Oppon, J A (2022) Key drivers for green building project financing in Ghana. Engineering, Construction and Architectural Management, 29(8), pp. 3023-3050. ISSN 0969-9988
Agyekum, K; Kissi, E; Danku, J C; Ampratwum, G and Amegatsey, G S (2020) Factors driving the career progression of construction project managers. Journal of Engineering, Design and Technology, 18(6), pp. 1773-1791. ISSN 1726-0531
Agyekum, K; Pittri, H; Botchway, E A and Dompey, A M A (2024) Key attributes of designers' competencies for design-for-deconstruction implementation. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 117-126. ISSN 17514304
Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects. PhD thesis, Nottingham Trent University, UK.
Agyekum-Mensah, G (2019) The degree of accuracy and factors that influence the uncertainty of SME cost estimates. International Journal of Construction Management, 19(5), pp. 413-426. ISSN 1562-3599
Agyemang, E.; Deku, C. S.; Owusu-Mante, S.; Forkuor, J. B.; Dwumah, P. and Ofori-Dua, K. (2026) Housing adaptations for climate resilience: Predictors of climate-responsive housing in coastal and savannah zones. Smart and Sustainable Built Environment, pp. 1-25. ISSN 2046-6099
Ahadzi, M and Bowles, G (2004) Public-private partnerships and contract negotiations: An empirical study. Construction Management and Economics, 22(9), pp. 967-978. ISSN 01446193
Ahadzi, M K (2004) Public private partnerships in infrastructure procurement: A generic multi-attribute hierarchical model for minimising pre-contract time and cost overruns (GMAHM). PhD thesis, Heriot-Watt University, UK.
Ahiaga-Dagbui, D and Smith, S D (2012) Neural networks for modelling the final target cost of water projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ahiaga-Dagbui, D; Smith, S D; Love, P E D and Ackermann, F (2015) Spotlight on construction cost overrun research: Superficial, replicative and stagnated. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.
Ahiaga-Dagbui, D D; Love, P E D; Whyte, A and Boateng, P (2017) Costing and technological challenges of offshore oil and gas decommissioning in the UK North Sea. Journal of Construction Engineering and Management, 143(7): 05017008, ISSN 0733-9364
Ahiaga-Dagbui, D D and Smith, S D (2014) Exploring escalation of commitment in construction project management: Case study of the scottish parliament project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193
Ahiaga-Dagbui D D, S S D (2013) My cost runneth over: Data mining to reduce construction cost overruns. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ahiaga-Dagbui D D, T O and Smith S D, W S (2013) A neuro-fuzzy hybrid model for predicting final cost of water infrastructure projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ahluwalia, S S (2009) A framework for efficient condition assessment of the building infrastructure. PhD thesis, University of Waterloo, Canada.
Ahmadi Esfahani, N and Shahandashti, M (2020) Post-hazard labor wage fluctuations: A comparative empirical analysis among different sub-sectors of the U.S. Construction sector. Journal of Financial Management of Property and Construction, 25(3), pp. 313-330. ISSN 1366-4387
Ahmadian, F F A; Akbarnezhad, A; Rashidi, T H and Waller, S T (2016) Accounting for transport times in planning off-site shipment of construction materials. Journal of Construction Engineering and Management, 142(1): 04015050, ISSN 0733-9364
Ahmadian Fard Fini, A; Maghrebi, M; Forsythe, P J and Waller, T S (2022) Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction. Engineering, Construction and Architectural Management, 29(2), pp. 573-600. ISSN 0969-9988
Ahmadian Fard Fini, Alireza (2017) Optimizing crew performance through integration of human resource strategies into planning of construction activities. PhD thesis, University of New South Wales, Australia.
Ahmadu, H A; Ibrahim, A D; Ibrahim, Y M and Adogbo, K J (2020) Incorporating aleatory and epistemic uncertainties in the modelling of construction duration. Engineering, Construction and Architectural Management, 27(9), pp. 2199-2219. ISSN 0969-9988
Ahmed, A (2012) Pavement damage cost estimation using highway agency maintenance, rehabilitation, and reconstruction strategies. PhD thesis, Purdue University, USA.
Ahmed, M O; El-Adaway, I H; Coatney, K T and Eid, M S (2016) Construction bidding and the winner's curse: Game theory approach. Journal of Construction Engineering and Management, 142(2): 04015076, ISSN 0733-9364
Ahmed, M O and El-adaway, I H (2023) An integrated game-theoretic and reinforcement learning modeling for multi-stage construction and infrastructure bidding. Construction Management and Economics, 41(3), pp. 183-207. ISSN 01446193
Ahmed, M O; Khalef, R; Ali, G G and El-Adaway, I H (2021) Evaluating deterioration of tunnels using computational machine learning algorithms. Journal of Construction Engineering and Management, 147(10): 04021125, ISSN 0733-9364
Ahmed, S; Haq, I and Anam, S M A (2024) Impacts of COVID-19 on the construction sector in the least developed countries. International Journal of Building Pathology and Adaptation, 42(6), pp. 1085-1105. ISSN 2398-4708
Ahmed, S; Mahmud, A; Akoh, S and Tariq, U (2024) Exploring IPD as an antidote to fragmentation within the UK construction sector. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.
Ahmed, T; Hossain, S M and Hossain, M A (2021) Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling. International Journal of Construction Management, 21(4), pp. 404-415. ISSN 1562-3599
Ahn, Sang Jun (2019) Transportation framework in panelized construction for residential building. PhD thesis, University of Alberta, Canada.
Ahuja, H N and Nandakumar, V (1985) Simulation model to forecast project completion time. Journal of Construction Engineering and Management, 111(4), pp. 325-342. ISSN 0733-9364
Aibinu, A A; Dassanayake, D; Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(2), pp. 190-213. ISSN 0969-9988
Aibinu, A A; Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors' perspectives. Construction Management and Economics, 29(5), pp. 463-481. ISSN 1466433X
Aibinu, A A and Pasco, T (2008) The accuracy of pre-tender building cost estimates in Australia. Construction Management and Economics, 26(12), pp. 1257-1269. ISSN 1466433X
Aihie, V U; Oyetunji, A K; Omotayo, T and Ekundayo, D (2025) Does the analytical hierarchy process help appraisers make better decisions? A quasi-experimental approach for property investment comparables. International Journal of Building Pathology and Adaptation, 43(1), pp. 117-133. ISSN 2398-4708
Ailabouni, N (2010) Factors affecting employee productivity in the UAE construction industry. PhD thesis, University of Brighton, UK.
Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Aivaliotis, V; Giannakopoulou, Y; Gratsiou, M and Panagiotakopoulos, D (1991) Economies of scale and strategic planning for municipal waste treatment plants in Greece. Construction Management and Economics, 9(6), pp. 553-564. ISSN 01446193
Aiyetan, A O and Das, D K (2023) Use of drones for construction in developing countries: Barriers and strategic interventions. International Journal of Construction Management, 23(16), pp. 2888-2897. ISSN 1562-3599
Ajayi, S; Saad, A; Oyegoke, A and Alaka, H (2024) Enhancing productivity and sustainability through BIM-based plugins: A case study of AutoBIM carbon diagnostics system. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects. PhD thesis, University of the West of England, Bristol, UK.
Aje, O I; Olatunji, O A and Olalusi, O A (2017) Overrun causations under advance payment regimes. Built Environment Project and Asset Management, 7(1), pp. 86-98. ISSN 2044-124X
Aka, A; Bello, A O; Bamgbade, A A and Bilau, A A (2024) Age-performance consideration in the recruitment of tradespeople in Nigerian construction industry. Engineering, Construction and Architectural Management, 31(1), pp. 386-404. ISSN 0969-9988
Akampurira, E and Windapo, A (2019) Key quality attributes of design documentation: South African perspective. Journal of Engineering, Design and Technology, 17(2), pp. 362-382. ISSN 1726-0531
Akan, G T; Imre, M and Arditi, D (1984) Priority ranking of highway improvement projects. Construction Management and Economics, 2(1), pp. 49-55. ISSN 01446193
Akbiyikli, R and Eaton, D (2006) Operation and maintenance (O&M) management in PFI road projects in the UK. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Akeel, N F (1989) A database tool for statistically based construction cost estimate. PhD thesis, University of Colorado at Boulder, USA.
Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.
Akhavian, R and Behzadan, A H (2013) Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining. Journal of Construction Engineering and Management, 139(11): 4013021, ISSN 0733-9364
Akhavian, Reza (2015) Data-driven simulation modeling of construction and infrastructure operations using process knowledge discovery. PhD thesis, University of Central Florida, USA.
Akin, S; Eghbali, A; Nwagwu, C and Hertwich, E (2025) Western Asian and Northern African residential building stocks: archetype analysis. Buildings & Cities, 6(1), pp. 219-238. ISSN 2632-6655
Akinbogun, O T (2023) An integrated capacity development for artisans in the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.
Akindele, M A (2024) Development and evaluation of portable reduced-complexity air quality models for policy assessment in Africa. PhD thesis, Carnegie Mellon University, USA.
Akinradewo, O; Aigbavboa, C and Oke, A (2020) Accuracy of road construction preliminary estimate: Examining the influencing factors. Built Environment Project and Asset Management, 10(5), pp. 657-671. ISSN 2044-124X
Akinradewo, O I; Aigbavboa, C O and Oke, A E (2020) Improving accuracy of road projects' estimates in the Ghanaian construction industry. Journal of Financial Management of Property and Construction, 25(3), pp. 407-421. ISSN 1366-4387
Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193
Akintoye, A; Beck, M; Hardcastle, C; Chinyio, E A and Asenova, D (2001) The financial structure of private finance initiative projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(2), pp. 161-172. ISSN 01446193
Akintoye, A and Sommerville, J (1995) Distributed lag relationships between UK construction orders and output. Construction Management and Economics, 13(1), pp. 33-42. ISSN 01446193
Akintoye, A S; Ajewole, O and Olomolaiye, P O (1992) Construction cost information management in Nigeria. Construction Management and Economics, 10(2), pp. 107-116. ISSN 01446193
Akpan, E O P and Igwe, O (2001) Methodology for determining price variation in project execution. Journal of Construction Engineering and Management, 127(5), pp. 367-373. ISSN 0733-9364
Aksözen, M; Hassler, U; Rivallain, M and Kohler, N (2017) Mortality analysis of an urban building stock. Building Research & Information, 45(3), pp. 259-277. ISSN 0961-3218
Aktas, C B (2011) Impact of product lifetime on life cycle assessment results. PhD thesis, University of Pittsburgh, USA.
Akunyumu, S; Fugar, F and Adinyira, E (2024) Evaluation of risks affecting international construction joint venture (ICJV) projects in Ghana. Journal of Engineering, Design and Technology, 22(6), pp. 1797-1824. ISSN 1726-0531
Akyol, B and Resatoglu, R (2019) Investigating the effect of solid and lightweight hollow block slabs on construction cost. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(2), pp. 70-79. ISSN 17514304
Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.
Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.
Al Dinah, M (2022) Coordination issues and unethical practices in comparison with other determinants of delays and cost overruns in the construction industry: how do the participants respond? PhD thesis, University of Portsmouth, UK.
Al Juboori, A A (2021) Exploring project costs estimator practices that increase the budget estimate’s accuracy during the initial phase of construction project’s life cycle. DM thesis, Colorado Technical University, USA.
Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.
Al Yami, H M A (2017) Decision making analysis for an integrated risk management framework of maritime container port infrastructure and transportation systems. PhD thesis, Liverpool John Moores University, UK.
Al Zarooni, S; Abdou, A and Lewis, J (2011) Improving the client briefing for UAE public healthcare projects: Space programming guidelines. Architectural Engineering and Design Management, 7(4), pp. 251-265. ISSN 1745-2007
Al-Atesh, E A; Rahmawati, Y; Zawawi, N A W A and Utomo, C (2023) A decision-making model for supporting selection of green building materials. International Journal of Construction Management, 23(5), pp. 922-933. ISSN 1562-3599
Al-Barghouthi, M T (2010) Capturing tacit knowledge in the construction industry in Saudi Arabia. DM thesis, University of Phoenix, USA.
Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.
Al-Fadhali, N; Zainal, R; Kasim, N; Dodo, M; Kim Soon, N and Hasaballah, A H A (2019) The desirability of integrated influential factors (IIFS) model of internal stakeholder as a panacea to project completion delay in Yemen. International Journal of Construction Management, 19(2), pp. 128-136. ISSN 1562-3599
Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.
Al-Ghzawi, M and El-Rayes, K (2023) Optimizing the planning of airport airside expansion projects to minimize air traffic disruptions and construction cost. Journal of Construction Engineering and Management, 149(4): 04023013, ISSN 0733-9364
Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(4), pp. 459-470. ISSN 01446193
Al-Hajj, A N (1991) Simple cost-significant models for total life-cycle costing in buildings. PhD thesis, University of Dundee, UK.
Al-Harbi, K M; Johnston, D W and Fayadh, H (1994) Building construction detailed estimating practices in saudi arabia. Journal of Construction Engineering and Management, 120(4), pp. 774-784. ISSN 0733-9364
Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman. PhD thesis, Loughborough University, UK.
Al-Hasan, M A A (2007) A parametric model for the estimation of construction project labour productivity. PhD thesis, Liverpool John Moores University, UK.
Al-Hashimy, H. N. H. and Yao, J. (2026) The moderating role of electronic accounting information systems in enhancing efficiency in construction project management. Engineering, Construction and Architectural Management, 33(4), pp. 3308-3331. ISSN 0969-9988
Al-Hashimy, H. N. H.; Yao, J.; Pitchay, A. A. and Hussein, W. N. (2026) Linking computerised accounting information systems to innovation, resilience and performance in construction projects. Engineering, Construction and Architectural Management, pp. 1-21. ISSN 0969-9988
Al-Hashimy, H N H (2025) The relationship between financial management strategies and firm financial performance: the moderating role of firm size. Journal of Financial Management of Property and Construction, 30(2), pp. 295-317. ISSN 1366-4387
Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.
Al-Jibouri, S and Mawdesley, M J (2001) Development and application of a stochastic based cost prediction model for construction. Journal of Financial Management of Property and Construction, 6(1), pp. 61-69. ISSN 1366-4387
Al-Jibouri, S H (1985) Cost models for construction. PhD thesis, University of Nottingham, UK.
Al-Kaisy, A and Nassar, K (2009) Developing a decision support tool for nighttime construction in highway projects. Journal of Construction Engineering and Management, 135(2), pp. 119-125. ISSN 0733-9364
Al-Keim, A (2017) Strategies to reduce cost overruns and schedule delays in construction projects. PhD thesis, Walden University, USA.
Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599
Al-Mohammad, M S; Haron, A T; Esa, M; Aloko, M N; Alhammadi, Y; Anandh, K S and Rahman, R A (2023) Factors affecting BIM implementation: Evidence from countries with different income levels. Construction Innovation, 23(3), pp. 683-710. ISSN 1471-4175
Al-Momani, A H (1996) Construction cost prediction for public school buildings in Jordan. Construction Management and Economics, 14(4), pp. 311-317. ISSN 01446193
Al-Omari, J A (1992) Critique of aspects of development theory using construction industry as a capital-surplus developing economy as an exemplar. PhD thesis, University of Reading, UK.
Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.
Al-Refaie, A; Alashwal, A; Abdul-Samad, Z; Salleh, H and Elshafie, A (2023) Evaluation of weather-productivity models of construction labour for tropics. Built Environment Project and Asset Management, 13(2), pp. 238-252. ISSN 2044-124X
Al-Sedairy, S (1984) Large scale projects: management, design and execution. PhD thesis, University of Sheffield, UK.
Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.
Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(4), pp. 1136-1157. ISSN 1726-0531
Al-Tabbaa, O and Rustom, R (2011) General framework for designing multi-use simulation modules for estimating project durations. Construction Innovation, 11(3), pp. 321-337. ISSN 1471-4175
Al-Tabtabai, H (1992) Judgemental forecasting in construction projects. Construction Management and Economics, 10(1), pp. 19-30. ISSN 01446193
Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988
Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.
Al-Tawal, D R; Arafah, M and Sweis, G J (2021) A model utilizing the artificial neural network in cost estimation of construction projects in Jordan. Engineering, Construction and Architectural Management, 28(9), pp. 2466-2488. ISSN 0969-9988
Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. PhD thesis, University of California, Berkeley, USA.
Al-Turfi, S (2017) Best practice project management for the sustainable regeneration of Holy Karbala Province in Iraq. PhD thesis, University of Bolton, UK.
Al-Wazeer, A A-R (2007) Risk-based bridge maintenance strategies. PhD thesis, University of Maryland, College Park, USA.
Al-Yami, A M and Price, A D F (2005) Exploring conceptual linkages between value engineering and sustainable construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.
AlTalhoni, A; Alwashah, Z; Liu, H; Abudayyeh, O; Kwigizile, V and Kirkpatrick, K (2026) Data-driven identification of key pricing factors in highway construction cost estimation during economic volatility. International Journal of Construction Management, 26(1), pp. 152-167. ISSN 1562-3599
Aladağ, H and Işık, Z (2019) Design and construction risks in BOT type mega transportation projects. Engineering, Construction and Architectural Management, 26(10), pp. 2223-2242. ISSN 0969-9988
Alananga, S; Lucian, C and Kusiluka, M M (2015) Significant cost-push factors in owner-built incremental housing construction in Tanzania. Construction Management and Economics, 33(8), pp. 671-688. ISSN 01446193
Alani, A M; Petersen, A K; Chapman, K G and Khosrowshahi, F (2004) A proposed quantitative model for building repair and maintenance: Theory, model development and application. Journal of Construction Research, 5(2), pp. 193-210. ISSN 1609-9451
Alao, O O; Jagboro, G O and Opawole, A (2018) Cost and time implications of abandoned project resuscitation: A case study of educational institutional buildings in Nigeria. Journal of Financial Management of Property and Construction, 23(2), pp. 185-201. ISSN 1366-4387
Alaqad, M (2021) Critical success factors for integration of value, financial risk, and environmental management systems in medium sized design and build projects. PhD thesis, University of Brighton, UK.
Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364
Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.
Alasad, R and Motawa, I (2015) Dynamic demand risk assessment for toll road projects. Construction Management and Economics, 33(10), pp. 799-817. ISSN 01446193
Alasad, R; Motawa, I and Ogunlana, S (2012) A system dynamics-based method for demand forecasting in infrastructure projects: A case of PPP projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Alashari, M; El-Rayes, K and Alotaibi, M (2023) Optimizing the planning of maintenance activities in education buildings. Journal of Construction Engineering and Management, 149(10): 04023094, ISSN 0733-9364
Alashwal, A M and Chew, M Y (2017) Simulation techniques for cost management and performance in construction projects in Malaysia. Built Environment Project and Asset Management, 7(5), pp. 534-545. ISSN 2044-124X
Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials. PhD thesis, Brunel University, UK.
Albert, I (2020) A lean production approach to materials management in the Nigerian construction industry. PhD thesis, Nelson Mandela University, South Africa.
Albogamy, A and Dawood, N (2015) Development of a client-based risk management methodology for the early design stage of construction processes: Applied to the KSA. Engineering, Construction and Architectural Management, 22(5), pp. 493-515. ISSN 0969-9988
Alchaer, E and Issa, C A (2020) Engineering productivity measurement: A novel approach. Journal of Construction Engineering and Management, 146(8): 0001875, ISSN 0733-9364
Aldaiyat, R M R E (2017) Perception eccentricities in risk time dimension of construction professionals in the state of Kuwait. PhD thesis, Loughborough University, UK.
Aldemir, Bora (2022) An agent based model for exploring the effects of overconfidence on the winner's curse in construction projects. PhD thesis, Izmir Institute of Technology, Turkey.
Aldhaheri, Mohammed (2023) Developing smart prisons in the United Arab Emirates. PhD thesis, Queensland University of Technology, Australia.
Alenazi, E O N (2018) Using BIM for delay management in public sector construction projects in KSA. PhD thesis, Loughborough University, UK.
Alex, D P; Al Hussein, M; Bouferguene, A and Fernando, S (2010) Artificial neural network model for cost estimation: City of Edmonton's water and sewer installation services. Journal of Construction Engineering and Management, 136(7), pp. 745-756. ISSN 0733-9364
Alfred Olatunji, O (2016) Blending 'fair dinkum' into group assessment of construction students. International Journal of Construction Education and Research, 12(4), pp. 270-284. ISSN 1557-8771
Algahtany, M (2018) Assessment and development of contractors' mitigation practices towards risks out of contractors' control in the Saudi construction industry. PhD thesis, Arizona State University, USA.
Alhabashi, M H (1991) Material management in the United States construction industry. DSc thesis, George Washington University, USA.
Alhadidi, Suleiman (2023) Real-time architecture: Quantifying the spatial performance of workplaces. DDes thesis, Harvard University, USA.
Alhalafi, M (2021) Develop a lean project management framework for the construction companies in order to improve the time and cost efficiencies of their construction operations. PhD thesis, De Montfort University, UK.
Alharbi, E A and Alsehaimi, A (2025) Machine learning model to predict the cooling load of mosque buildings during the design stage. International Journal of Construction Management, 25(8), pp. 965-979. ISSN 1562-3599
Alhasan, S; Amoudi, O; Tong, M and Kumar, B (2019) Effectiveness of adopting BIM on quantity surveying profession during the project life cycle. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Alhashedi, E; Zhang, H and Lin, Y (2026) Adaptive estimation and management of cost contingencies in EPC projects. Journal of Construction Engineering and Management, 152(5): 04026056, ISSN 0733-9364
Alhumayani, H (2022) The feasibility of 3D printing technology as a new construction method for houses in Saudi Arabia. PhD thesis, Cardiff University, UK.
Alhumayn, S A (2018) Developing a framework for BIM implementation in the saudi arabian construction industry. PhD thesis, University of Wolverhampton, UK.
Ali, A S and Au-Yong, C P (2022) Risk factors in the refurbishment design process: The case of Malaysia. International Journal of Building Pathology and Adaptation, 40(4), pp. 622-635. ISSN 23984708
Ali, A S; Azmi, N F and Baaki, T K (2018) Cost performance of building refurbishment works: The case of Malaysia. International Journal of Building Pathology and Adaptation, 36(1), pp. 41-62. ISSN 23984708
Ali, H M and Ruddock, L (2000) The impact of portfolio strategy onthe 'style' performance of UK property companies. Journal of Financial Management of Property and Construction, 5(3), pp. 123-133. ISSN 1366-4387
Ali, M M and Elazouni, A (2009) Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Construction Management and Economics, 27(9), pp. 839-856. ISSN 1466433X
Ali, S; Zayed, T and Hegab, M (2007) Modeling the effect of subjective factors on productivity of trenchless technology application to buried infrastructure systems. Journal of Construction Engineering and Management, 133(10), pp. 743-748. ISSN 0733-9364
Aligamhe, V I; Mustapa, M; Ogbu, C P and Misnan, M S (2024) Modelling cost-risk impact on Nigerian highway projects using multiple linear regression and artificial neural networks. Journal of Construction in Developing Countries, 29(2), pp. 107-128. ISSN 1823-6499
Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364
Alinaitwe, H; Apolot, R and Tindiwensi, D (2013) Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), pp. 33-47. ISSN 1823-6499
Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.
Alkaissy, M; Arashpour, M; Zeynalian, M and Li, H (2022) Worksite accident impacts on construction and infrastructure: Nondeterministic analysis of subsectors and organization sizes. Journal of Construction Engineering and Management, 148(6): 04022023, ISSN 0733-9364
Alkasisbeh, M R (2018) An integrated decision support framework for life-cycle building asset management. PhD thesis, Western Michigan University, USA.
Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193
Alkayyali, O J (1993) A computerized multi-dimensional support system (CM-DSS) for planning, scheduling and controlling construction projects. PhD thesis, University of Cincinnati, USA.
Alkhorayef, A N M (2014) Improving decision making on large scale investment projects: A psychological perspective. PhD thesis, University of Leeds, UK.
Allahaim, Fahad Saud Abdulaziz (2015) Improving cost contingency estimation for infrastructure projects based on the impact of cost overrun causes of similar projects – illustration using Saudi Arabia survey data. PhD thesis, University of Sydney, Australia.
Allahi, Fahimeh (2020) Development of simulation based approaches for cost estimation and effect analysis in industrial and humanitarian projects, including system dynamic model and Monte Carlo simulation. PhD thesis, Università degli Studi di Genova, Italy.
Allam, A; Elbeltagi, E; Abouelsaad, M N and E. El Madawy, M (2026) Integrated BIM-GA approach for slab formwork design optimization. Construction Innovation, 26(2), pp. 631-651. ISSN 1471-4175
Alleman, D and Lee, E B (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), pp. 2859-2891. ISSN 0969-9988
Allenby, V R (1986) Cost models for engineering services. PhD thesis, Aston University, UK.
Allouche, E N; Ariaratnam, S T and Lueke, J S (2000) Horizontal directional drilling: Profile of an emerging industry. Journal of Construction Engineering and Management, 126(1), pp. 68-76. ISSN 0733-9364
Allouche, E N; Ariaratnam, S T and MacLeod, C W (2003) Software for planning and cost control in directional drilling projects. Journal of Construction Engineering and Management, 129(4), pp. 446-453. ISSN 0733-9364
Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.
Almarri, K (2023) The value for money factors and their interrelationships for smart city public-private partnerships projects. Construction Innovation, 23(4), pp. 815-832. ISSN 1471-4175
Almarri, K; Alzahrani, S and Boussabaine, H (2019) An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management, 26(8), pp. 1696-1711. ISSN 0969-9988
Almarri, K and Boussabaine, H (2021) Re-evaluating the risk costing agenda in PPP projects. Built Environment Project and Asset Management, 11(1), pp. 22-37. ISSN 2044-124X
Almarri, K and Boussabaine, H (2025) Critical success factors for public–private partnerships in smart city infrastructure projects. Construction Innovation, 25(2), pp. 224-247. ISSN 1471-4175
Almarri, K; Boussabaine, H and Al Nauimi, H (2023) The influence of risks on the outturn cost of ICT infrastructure network projects. Construction Innovation, 23(1), pp. 85-104. ISSN 1471-4175
Almeida, Y. and Calejo, R. (2026) Innovation in public works management: Proposal for a performance evaluation model based on cost and deadline indicators. Construction Management and Economics, 44(9), pp. 721-740. ISSN 0144-6193
Almeida, L; Tam, V W Y; Le, K N and She, Y (2020) Effects of occupant behaviour on energy performance in buildings: A green and non-green building comparison. Engineering, Construction and Architectural Management, 27(8), pp. 1939-1962. ISSN 0969-9988
Almusharraf, A and Whyte, A (2016) Task-based defect management: Anatomical classification. Built Environment Project and Asset Management, 6(3), pp. 345-358. ISSN 2044-124X
Almås, A J and Hygen, H O (2012) Impacts of sea level rise towards 2100 on buildings in Norway. Building Research & Information, 40(3), pp. 245-259. ISSN 0961-3218
Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.
Alnaser, N W (2010) Utilisation of solar and wind energy in buildings in the Kingdom of Bahrain: a step towards sustainable building construction. PhD thesis, University of Reading, UK.
Alnaser, N W and Alnaser, W E (2022) Modelling the yield of 8.64 kw PV panels installed on a rooftop of a building in the Kingdom of Bahrain. Smart and Sustainable Built Environment, 11(1), pp. 162-174. ISSN 2046-6099
Alnuaimi, A S; Taha, R A; Al Mohsin, M and Al-Harthi, A S (2010) Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615-622. ISSN 0733-9364
Alolote Ibim, A and Dimkpa, K (2022) Assessing the cost accuracy of electrical works towards sustainable procurement of building services. International Journal of Construction Management, 22(10), pp. 1974-1982. ISSN 1562-3599
Alotaibi, A B (2019) Project management: the implication of project management practices on project success in Saudi Arabia. PhD thesis, University of Portsmouth, UK.
Alotaibi, M; El-Rayes, K and Altuwaim, A (2021) Optimizing the renovation scheduling of leased residential buildings to minimize total project cost. Journal of Construction Engineering and Management, 147(7): 2063, ISSN 0733-9364
Alotaibi, S S (2016) The international contractor's decision to invest: a strategic risk management decision model for public private partnership projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.
Alqahtani, A and Whyte, A (2013) Artificial neural networks incorporating cost significant items towards enhancing estimation for (life-cycle) costing of construction projects. Construction Economics and Building, 13(3), pp. 51-64. ISSN 2204-9029
Alqahtani, A and Whyte, A (2016) Estimation of life-cycle costs of buildings: Regression vs artificial neural network. Built Environment Project and Asset Management, 6(1), pp. 30-43. ISSN 2044-124X
Alqahtani, A and Whyte, A (2016) Evaluation of non-cost factors affecting the life cycle cost: An exploratory study. Journal of Engineering, Design and Technology, 14(4), pp. 818-834.
Alqahtani, F K; Alkhaldi, M; Alsaqer, T; Abotaleb, I S; Mohamed, A G and Dirar, S (2022) A comparative assessment of advanced construction systems incorporating green concrete. Journal of Construction Engineering and Management, 148(9): 04022083, ISSN 0733-9364
Alroomi, A; Jeong, D H S and Oberlender, G D (2012) Analysis of cost-estimating competencies using criticality matrix and factor analysis. Journal of Construction Engineering and Management, 138(11), pp. 1270-1280. ISSN 0733-9364
Alroomi, A S (2013) Integrative framework for sustainable development of the cost estimating profession. PhD thesis, Oklahoma State University, USA.
Alsahly, F F M (2016) Improving the management of change requests in construction of large building projects in Saudi Arabia. PhD thesis, University of Hull, UK.
Alsamarraie, M M; Yousif, O S and Ghazali, F E M (2025) Procurement integrity: Best practices for PPP projects in Iraq and Malaysia. Construction Economics and Building, 25(3-4), pp. 289-310. ISSN 2204-9029
Alsamarraie, M M and Ghazali, F (2023) Evaluation of organizational procurement performance for public construction projects: Systematic review. International Journal of Construction Management, 23(14), pp. 2499-2508. ISSN 1562-3599
Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique. PhD thesis, Brunel University, UK.
Alsharqawi, M; Abu Dabous, S; Zayed, T and Hamdan, S (2021) Budget optimization of concrete bridge decks under performance-based contract settings. Journal of Construction Engineering and Management, 147(6): 04021040, ISSN 0733-9364
Alshboul, O. and Shehadeh, A. (2026) Conflict resolution and negotiation in construction projects using game theory: Achieving win-win outcomes. International Journal of Construction Management, 26(7), pp. 1341-1364. ISSN 1562-3599
Alshdiefat, A S (2018) Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry. PhD thesis, University of Salford, UK.
Alshihre, F (2018) Development of a framework for client satisfaction in the Saudi construction industry. PhD thesis, University of Wolverhampton, UK.
Alshorafa, R and Ergen, E (2021) Determining the level of development for BIM implementation in large-scale projects: A multi-case study. Engineering, Construction and Architectural Management, 28(1), pp. 397-423. ISSN 0969-9988
Alsohiman, N K (2017) Modelling variation for improving the management of construction engineering project outcomes in the Kingdom of Saudi Arabia. PhD thesis, University of Liverpool, UK.
Alsulamy, S (2015) Developing a performance measurement framework for municipal construction projects in Saudi Arabia. PhD thesis, Edinburgh Napier University, UK.
Alsulamy, S; Wamuziri, S and Taylor, M (2012) Evaluation of key metrics for measurement of project performance. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.
Alsyouf, L; Al Harbat, R; Ma'bdeh, S N and Mushtaha, E S N (2026) Economic feasibility of low-impact retrofit strategies for enhancing energy efficiency in residential townhouses: A case study of sharjah. Construction Economics and Building, 26(1), ISSN 2204-9029
Altuwaijri, H A (2014) A study of the relationship between the use of GIS and project success in selected construction organizations. PhD thesis, Eastern Michigan University, USA.
Alumbugu, P O (2019) Construction material logistics management: the case of north-central Nigeria. PhD thesis, Nelson Mandela University, South Africa.
Alvanchi, A; Bajalan, Z and Iravani, P (2021) Emission assessment of alternative dam structure types, a novel approach to consider in new dam projects. Construction Innovation, 21(2), pp. 203-217. ISSN 1471-4175
Alvanchi, A; Lee, S and Abourizk, S (2012) Dynamics of working hours in construction. Journal of Construction Engineering and Management, 138(1), pp. 66-77. ISSN 0733-9364
Alves, J. L.; Almeida Filho, A. T. D.; Bradaschia, F. and Palha, R. P. (2026) Solarisbim.AI: Smart sustainable building planning with BIM-based solar-production estimation using machine-learning radiation forecasts. Journal of Construction Engineering and Management, 152(6): 04026076, ISSN 0733-9364
Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships. PhD thesis, George Washington University, USA.
Alwisy, A; Bouferguene, A and Al-Hussein, M (2020) Framework for target cost modelling in construction projects. International Journal of Construction Management, 20(2), pp. 89-104. ISSN 1562-3599
Alzahrani, S (2015) Dynamic simulation of the impact of risk events and risk cost in KSA PPP projects. PhD thesis, University of Liverpool, UK.
Alzanati, A (2021) Complex building construction projects: reducing rework through facilitation of craftspeople's motivation in United Arab Emirates. PhD thesis, Bournemouth University, UK.
Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.
Alzraiee, H (2022) Cost estimate system using structured query language in BIM. International Journal of Construction Management, 22(14), pp. 2731-2743. ISSN 1562-3599
Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599
Alzubi, Y; Aljaafreh, A and Khatatbeh, A (2024) Application of machine learning techniques in estimating the construction cost of residential buildings in the middle East region. International Journal of Construction Management, 24(9), pp. 946-958. ISSN 1562-3599
Amadi, A I (2026) Construction economics at early stage: Order of cost estimating, life cycle costing and development appraisal of a proposed office complex. International Journal of Building Pathology and Adaptation, 44(1), pp. 70-90. ISSN 2398-4708
Amadi, A (2023) The statistical sensitivity of highway project cost to geo-heterogeneity in the tropics. International Journal of Building Pathology and Adaptation, 41(4), pp. 875-902. ISSN 23984708
Amadi, A (2023) Integration in a mixed-method case study of construction phenomena: From data to theory. Engineering, Construction and Architectural Management, 30(1), pp. 210-237. ISSN 0969-9988
Amadi, A and Higham, A (2016) Geotechnical characterization of cost overrun drivers in highway projects: Predicated on heterogeneous ground conditions in the Niger delta region of Nigeria. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Amadi, A and Higham, A P (2020) A cost trajectory to environmentally adaptive building construction in wet humid settings. International Journal of Building Pathology and Adaptation, 38(1), pp. 68-88. ISSN 23984708
Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.
Amadi, A I (2023) Towards methodological adventure in cost overrun research: Linking process and product. International Journal of Construction Management, 23(3), pp. 528-541. ISSN 1562-3599
Amadi, A I (2024) Investigating ground-related design deficiencies as potential triggers to cost overruns in highway projects. Journal of Financial Management of Property and Construction, 29(3), pp. 349-371. ISSN 1366-4387
Amadi, A I and Higham, A (2017) Latent geotechnical pathogens inducing cost overruns in highway projects. Journal of Financial Management of Property and Construction, 22(3), pp. 269-285. ISSN 1366-4387
Amadi, A I and Higham, A (2018) The trickle-down effect of psycho-social constructs and knowledge deficiencies as organizational barriers to cost performance on highway projects. Journal of Financial Management of Property and Construction, 23(1), pp. 57-72. ISSN 1366-4387
Amadi, A I and Higham, A (2019) Putting context to numbers: A geotechnical risk trajectory to cost overrun extremism. Construction Management and Economics, 37(4), pp. 217-237. ISSN 01446193
Amany, A; Taghizade, K and Noorzai, E (2020) Investigating conflicts of expert contractors using the last planner system in building information modeling process. Journal of Engineering, Design and Technology, 18(6), pp. 1381-1402. ISSN 1726-0531
Ambekar, S.; Dhaigude, A. S.; Chatterjee, D. and Tapar, A. V. (2025) Identifying and ranking critical success factors for contractor value addition in the construction sector using the ISM-IRP technique. Construction Innovation, 26(5), pp. 1582-1613. ISSN 1471-4175
Ameen, J R M; Neale, R H and Abrahamson, M (2003) An application of regression analysis to quantify a claim for increased costs. Construction Management and Economics, 21(2), pp. 159-165. ISSN 01446193
Ameh, O J; Soyingbe, A A and Odusami, K T (2010) Significant factors causing cost overruns in telecommunication projects in Nigeria. Journal of Construction in Developing Countries, 15(2), pp. 49-67. ISSN 1823-6499
Amekudzi, A (1999) Uncertainty analysis of national highway performance measures in the context of evolving analysis models and data. PhD thesis, Carnegie Mellon University, USA.
Amin, S H (2024) Predictive relationship in time and cost between planning and construction phases in capital projects. DBA thesis, Grand Canyon University, USA.
Amini, S; Rezvani, A; Tabassi, M and Malek Sadati, S S (2023) Causes of cost overruns in building construction projects in Asian countries; Iran as a case study. Engineering, Construction and Architectural Management, 30(7), pp. 2739-2766. ISSN 0969-9988
Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.
Aminorlah, A I; Rahim, N A; Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 57-79. ISSN 1823-6499
Amirkhanian, S N; Burati, J L and Mirchandani, H C (1994) Effect of testing variability on contractor payment for asphalt pavements. Journal of Construction Engineering and Management, 120(3), pp. 579-592. ISSN 0733-9364
Ammar, M; Zayed, T and Moselhi, O (2013) Fuzzy-based life-cycle cost model for decision making under subjectivity. Journal of Construction Engineering and Management, 139(5), pp. 556-563. ISSN 0733-9364
Ammar, M A and Abd-ElKhalek, S I (2022) Criticality measurement in fuzzy project scheduling. International Journal of Construction Management, 22(2), pp. 252-261. ISSN 1562-3599
Ammar, M A and Samy, M (2015) Learning curve modelling of gas pipeline construction in Egypt. International Journal of Construction Management, 15(3), pp. 229-238. ISSN 1562-3599
Ammar, T; Abdel-Monem, M and El-Dash, K (2025) Regression-based model predicting cost contingencies for road network projects. International Journal of Construction Management, 25(11), pp. 1273-1287. ISSN 1562-3599
Amorim, Adriana Eloa Bento (2020) Construction workers remote estimate of the wbgt index in outdoor activities on concrete slabs. PhD thesis, Universidade Estadual de Campinas, Brazil.
Ampratwum, G; Tam, V W Y and Osei-Kyei, R (2023) Critical analysis of risks factors in using public-private partnership in building critical infrastructure resilience: A systematic review. Construction Innovation, 23(2), pp. 360-382. ISSN 1471-4175
Amuda Yusuf, G and Mohamed, S F (2014) Perceived benefits of adopting standard: based pricing mechanism for mechanical and electrical services installations. Construction Economics and Building, 14(2), pp. 104-119. ISSN 2204-9029
Amuda-Yusuf, G and Mohamed, S F (2015) Essential features of a building services standard method of measurement in Malaysia. Engineering, Construction and Architectural Management, 22(6), pp. 749-770. ISSN 0969-9988
An, Mi Sun (2024) Framework for interactive, individualized feedback design to improve thinking skills in construction education. PhD thesis, Texas A&M University, USA.
An, X; Li, H; Zuo, J; Ojuri, O; Wang, Z and Ding, J (2018) Identification and prevention of unbalanced bids using the unascertained model. Journal of Construction Engineering and Management, 144(11): 05018013, ISSN 0733-9364
Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.
Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364
Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364
Anastasopoulos, P C; Labi, S; Bhargava, A and Mannering, F L (2012) Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), pp. 390-398. ISSN 0733-9364
Ancell, D (2013) Construction studies in higher education and the use of digital technology. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Andalib, R; Hoseini, A and Gatmiri, B (2018) A stochastic model of cash flow forecasting considering delays in owners' payments. Construction Management and Economics, 36(10), pp. 545-564. ISSN 01446193
Andam, K A (1979) Computer aided design of precast concrete industrial buildings. PhD thesis, University of Newcastle upon Tyne, UK.
Anderson, B (2023) A residential emissions-based carbon levy: City and neighbourhood consequences. Buildings & Cities, 4(1), pp. 545-564. ISSN 2632-6655
Anderson, B and James, P (2021) Covid-19 lockdown: Impacts on gb electricity demand and CO2 emissions. Buildings & Cities, 2(1), pp. 134-149. ISSN 2632-6655
Anglade, Y J (1998) Development of methodology for highway agencies to follow in establishing optimum acceptance plans for pavements. PhD thesis, University of Florida, USA.
Annamalaisami, C D and Kuppuswamy, A (2022) Reckoning construction cost overruns in building projects through methodological consequences. International Journal of Construction Management, 22(6), pp. 1079-1089. ISSN 1562-3599
Anondho, B; Soeleiman, L; Latief, Y and Mochtar, K (2023) The influence of external factors on construction project performance based on estimated duration in Jakarta. International Journal of Construction Management, 23(13), pp. 2270-2278. ISSN 1562-3599
Antoniou, F; Konstantinidis, D; Aretoulis, G and Xenidis, Y (2018) Preliminary construction cost estimates for motorway underpass bridges. International Journal of Construction Management, 18(4), pp. 321-330. ISSN 1562-3599
Antunes, R; González, V A; Walsh, K; Rojas, O; O'Sullivan, M and Odeh, I (2018) Benchmarking project-driven production in construction using productivity function: Capacity and cycle time. Journal of Construction Engineering and Management, 144(3): 04017118, ISSN 0733-9364
Antwi-Afari, M F; Li, H; Umer, W; Yu, Y and Xing, X (2020) Construction activity recognition and ergonomic risk assessment using a wearable insole pressure system. Journal of Construction Engineering and Management, 146(7): 04020077, ISSN 0733-9364
Anwer, S; Li, H; Antwi-Afari, M F; Umer, W; Mehmood, I and Wong, A Y L (2022) Effects of load carrying techniques on gait parameters, dynamic balance, and physiological parameters during a manual material handling task. Engineering, Construction and Architectural Management, 29(9), pp. 3415-3438. ISSN 0969-9988
Aoieong, R T; Tang, S L and Ahmed, S M (2002) A process approach in measuring quality costs of construction projects: Model development. Construction Management and Economics, 20(2), pp. 179-192. ISSN 01446193
Aoieong, Raymond Taiman (2004) Capturing quality costs of construction processes using the construction process cost model (CPCM). PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.
Aouad, G F; Child, T; Brandon, P S and Sarshar, M (1998) Linking construction information through VR using an object oriented environment. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Apinayan, K.; Perera, B. A. K. S.; Weerasooriya, D. and Ranadewa, K. A. T. O. (2026) Adaptability of BIM technology for detailed cost estimation in Sri Lankan construction industry. Journal of Engineering, Design and Technology, 24(3), pp. 633-665. ISSN 1726-0531
Apipattanavis, S (2007) Stochastic nonparametric methods for multi-site weather generation and flood frequency estimation: Applications to construction delay, hydrology and agricultural modeling. PhD thesis, University of Colorado at Boulder, USA.
Appau, K A (1994) An integrated model of computer-aided cost estimating/scheduling in construction management. PhD thesis, Georgia Institute of Technology, USA.
Apu, N and Sinha, R (2020) Seismic fragility assessment of ductile reinforced concrete building frames. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 425-442. ISSN 1759-5916
Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects. PhD thesis, Heriot-Watt University, UK.
Arabiat, A; Edum-Fotwe, F T and McCaffer, R (2007) Does client behaviour actively induce risk in construction projects? In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Aragon, V; Gauthier, S; Warren, P; James, P A B and Anderson, B (2019) Developing English domestic occupancy profiles. Building Research & Information, 47(4), pp. 375-393. ISSN 0961-3218
Aramali, V; Gibson, G E; El Asmar, M and Sanboskani, H (2023) Novel earned value management system maturity framework and its relation to project performance. Journal of Construction Engineering and Management, 149(6): 04023031, ISSN 0733-9364
Arashida, R. and Horita, M. (2026) A data-driven framework for causal modeling of design change propagation in civil infrastructure. Journal of Construction Engineering and Management, 152(10): 04026158, ISSN 0733-9364
Arashpour, M; Wakefield, R; Abbasi, B; Arashpour, M and Hosseini, R (2018) Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. Architectural Engineering and Design Management, 14(1-2), pp. 46-59. ISSN 1745-2007
Araujo, Luís Otávio Cocito de (2005) Method to propose directions improving labor productivity in the steel reinforcement activities. PhD thesis, Universidade de São Paulo, Brazil.
Arditi, D and Albulak, M Z (1986) Line-of-balance scheduling in pavement construction. Journal of Construction Engineering and Management, 112(3), pp. 411-424. ISSN 0733-9364
Arditi, D and Chotibhongs, R (2009) Detection and prevention of unbalanced bids. Construction Management and Economics, 27(8), pp. 721-732. ISSN 1466433X
Arditi, D and Koseoglu, H (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics, 1(1), pp. 3-16. ISSN 01446193
Arditi, D and Mochtar, K (1996) Productivity improvement in the Indonesian construction industry. Construction Management and Economics, 14(1), pp. 13-24. ISSN 01446193
Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193
Arditi, D and Suh, K (1991) Estimating system selection expert. Construction Management and Economics, 9(4), pp. 369-381. ISSN 01446193
Arhinful, R; Attabra, F K; Mensah, L and Obeng, H A (2026) The mediating role of talent management in the relationship between project manager competencies and sustainable competitive advantage in the Ghanaian construction industry. Construction Management and Economics, 44(2), pp. 119-142. ISSN 0144-6193
Arif, F (2013) A decision support framework for infrastructure maintenance investment decision-making. PhD thesis, Florida International University, USA.
Arif, F; Lodi, S H and Azhar, N (2015) Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality. International Journal of Construction Management, 15(1), pp. 59-70. ISSN 1562-3599
Arif, M; Syal, M and Hightower, R (2013) Investigating the green leadership in energy and environmental design (LEED) servicescape scale in Brazil. Construction Innovation, 13(3), pp. 242-265. ISSN 1471-4175
Arja, M; Sauce, G and Souyri, B (2009) External uncertainty factors and LCC: A case study. Building Research & Information, 37(3), pp. 325-334. ISSN 0961-3218
Arocho Rosa, I d M (2015) The impact of transportation construction projects and activities on emissions. PhD thesis, North Carolina State University, USA.
Arowoiya, V A; Oke, A E; Akanni, P O; Kwofie, T E and Enih, P I (2023) Augmented reality for construction revolution–analysis of critical success factors. International Journal of Construction Management, 23(11), pp. 1867-1874. ISSN 1562-3599
Arshad, H; Qasim, M; Thaheem, M J and Gabriel, H F (2017) Quantification of material wastage in construction industry of Pakistan: An analytical relationship between building types and waste generation. Journal of Construction in Developing Countries, 22(2), pp. 19-34. ISSN 1823-6499
Art Chaovalitwongse, W; Wang, W; Williams, T P and Chaovalitwongse, P (2012) Data mining framework to optimize the bid selection policy for competitively bid highway construction projects. Journal of Construction Engineering and Management, 138(2), pp. 277-286. ISSN 0733-9364
Artmann, N; Gyalistras, D; Manz, H and Heiselberg, P (2008) Impact of climate warming on passive night cooling potential. Building Research & Information, 36(2), pp. 111-128. ISSN 0961-3218
Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.
Asadi, R; Rotimi, J O B and Wilkinson, S (2023) Analyzing underlying factors of rework in generating contractual claims in construction projects. Journal of Construction Engineering and Management, 149(6): 04023036, ISSN 0733-9364
Asante, J; Kissi, E; Gyadu-Asiedu, W; Adinkrah-Appiah, K; Atta Nyamekye, C and Badu, B (2025) Factors influencing contractors services demand in developing countries: The case of the Ghanaian construction firms. International Journal of Construction Management, 25(15), pp. 1769-1777. ISSN 1562-3599
Asare, E; Owusu-Manu, D G; Ayarkwa, J; Martek, I and Edwards, D J (2026) Empirical perspective of working capital management practices among large building construction firms in Ghana. Construction Innovation, 26(3), pp. 768-785. ISSN 1471-4175
Asare, E; Owusu-Manu, D G; Ayarkwa, J; Edwards, D J and Martek, I (2023) Thematic literature review of working capital management in the construction industry: Trends and research opportunities. Construction Innovation, 23(4), pp. 775-791. ISSN 1471-4175
Asgari, S (2016) Modeling construction competitive bidding: An agent-based approach. PhD thesis, Columbia University, USA.
Asghari, V and Hsu, S C (2022) Upscaling complex project-level infrastructure intervention planning to network assets. Journal of Construction Engineering and Management, 148(1): 04021188, ISSN 0733-9364
Ashrafi, R M (1981) Risk analysis in management planning and project control: probabilistic techniques are applied to the estimation, planning, forecasting and control of large capital projects to ascertain and reduce the degree of inherent risk and uncertainty. PhD thesis, University of Bradford, UK.
Ashuri, B and Lu, J (2010) Time series analysis of ENR construction cost index. Journal of Construction Engineering and Management, 136(11), pp. 1227-1237. ISSN 0733-9364
Ashuri, B; Shahandashti, S M and Lu, J (2012) Empirical tests for identifying leading indicators of ENR construction cost index. Construction Management and Economics, 30(11), pp. 917-927. ISSN 1466433X
Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364
Asiedu, E M and Mkansi, M (2023) Critical factors contributing to budget overruns in Ghana's telecommunication industry construction projects. Journal of Construction in Developing Countries, 28(2), pp. 265-293. ISSN 1823-6499
Asiedu, R O; Adaku, E and Owusu-Manu, D-G (2017) Beyond the causes: Rethinking mitigating measures to avert cost and time overruns in construction projects. Construction Innovation, 17(3), pp. 363-380. ISSN 1471-4175
Asiedu, R O and Ameyaw, C (2021) A system dynamics approach to conceptualise causes of cost overrun of construction projects in developing countries. International Journal of Building Pathology and Adaptation, 39(5), pp. 831-851. ISSN 23984708
Asiedu, R O; Frempong, N K and Alfen, H W (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(1), pp. 21-39. ISSN 0969-9988
Asiedu, R O; Frempong, N K and Nani, G (2016) Parametric time overrun estimation of building projects. Journal of Financial Management of Property and Construction, 21(3), pp. 253-268. ISSN 1366-4387
Asiedu, R O and Gyadu-Asiedu, W (2020) Assessing the predictability of construction time overruns using multiple linear regression and Markov chain Monte Carlo. Journal of Engineering, Design and Technology, 18(3), pp. 583-600. ISSN 1726-0531
Asif, M (1988) Simple generic models for cost-significant estimating of construction project costs. PhD thesis, University of Dundee, UK.
Aslay, S E and Dede, T (2024) Reduce the construction cost of a 7-story RC public building with metaheuristic algorithms. Architectural Engineering and Design Management, 20(2), pp. 214-229. ISSN 1745-2007
Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364
Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran. PhD thesis, Nottingham Trent University, UK.
Assaad, R; El-Adaway, I H and Abotaleb, I S (2020) Predicting project performance in the construction industry. Journal of Construction Engineering and Management, 146(5): 04020030, ISSN 0733-9364
Assaad, R A (1991) Structured labor markets: The case of the construction sector in Egypt. PhD thesis, Cornell University, USA.
Assaad, R H; Omran, A; Soliman, N and Assaf, G (2024) Prediction of the lateral pressure of self-consolidating concrete on construction formwork systems using machine-learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024110, ISSN 0733-9364
Assaf, G and Assaad, R H (2025) A decision-support system for choosing between traditional and alternative project delivery methods for bundled projects. Engineering, Construction and Architectural Management, 32(11), pp. 7181-7216. ISSN 0969-9988
Assaf, G and Assaad, R H (2024) Analyzing the critical success factors affecting project bundling performance of infrastructure projects. Journal of Construction Engineering and Management, 150(9): 04024106, ISSN 0733-9364
Assaf, G and Assaad, R H (2024) A data-driven decision-support tool for selecting the optimal project delivery method for bundled projects: Integrating machine learning and expert domain knowledge. Journal of Construction Engineering and Management, 150(12): 04024181, ISSN 0733-9364
Atapattu, C N; Domingo, N and Sutrisna, M (2025) A bibliometric review of the statistical modelling techniques for cost estimation of infrastructure projects. Smart and Sustainable Built Environment, 14(5), pp. 1369-1388. ISSN 2046-6099
Atapattu, C N; Domingo, N and Sutrisna, M (2023) Significant factors affecting the New Zealand transportation infrastructure project cost: quantity surveyors' perception. Built Environment Project and Asset Management, 13(5), pp. 756-777. ISSN 2044-124X
Atapattu, C N; Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(3), pp. 388-404. ISSN 1366-4387
Athanasopoulou, E (2008) Delays in construction projects using traditional contract forms: Causes and effects. PhD thesis, University College London, UK.
Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.
Atkinson, J G B (2008) Market influences on low carbon energy designs in buildings. EngD thesis, University of Surrey, UK.
Atmaca, N (2017) Life-cycle assessment of post-disaster temporary housing. Building Research & Information, 45(5), pp. 524-538. ISSN 0961-3218
Atta, A; Ali, N; Taman, M and Etman, E (2018) Improvement the structural behavior of recycled RC elements using CdO nanoparticles. Construction Innovation, 18(2), pp. 134-151. ISSN 1471-4175
Attalla, M and Hegazy, T (2003) Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression. Journal of Construction Engineering and Management, 129(4), pp. 405-411. ISSN 0733-9364
Attalla, M M A M (2000) Reconstruction of operating facilities: A model for project management. PhD thesis, University of Waterloo, Canada.
Attara, M G (2015) Predicting cost overrun of railroad bridge construction. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Attoh-Okine, N O (2003) Rule induction in productivity analysis: A rough set approach. Engineering, Construction and Architectural Management, 10(6), pp. 413-417. ISSN 0969-9988
Au-Yong, C P; Ali, A S and Pavaraj, A (2023) Prioritising the maintenance of university hostels to improve students' satisfaction. Journal of Construction in Developing Countries, 28(1), pp. 151-169. ISSN 1823-6499
Au-Yong, C P; Chua, S J L; Ali, A S and Tucker, M (2019) Optimising maintenance cost by prioritising maintenance of facilities services in residential buildings. Engineering, Construction and Architectural Management, 26(8), pp. 1593-1607. ISSN 0969-9988
Auchey, F L and Auchey, G J (2004) Picking successful projects by using the prism lltm model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Augugliaro, F (2015) Physical interaction, aerial construction, and coordinated flight for flying machines. DSc thesis, ETH Zürich, Switzerland.
Aulich, H T (2013) The role of effective communication in the construction industry: A guide for education and health clients. Construction Economics and Building, 13(4), pp. 92-101. ISSN 2204-9029
Aurangzeb, Q (2014) Impact of reclaimed asphalt pavements on pavement sustainability. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193
Austin, S; Baldwin, A and Waskett, P (1997) Development of a prototype building design management tool. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Avetisyan, H G; Miller-Hooks, E and Melanta, S (2012) Decision models to support greenhouse gas emissions reduction from transportation construction projects. Journal of Construction Engineering and Management, 138(5), pp. 631-641. ISSN 0733-9364
Aviram Traubita, A (2009) Structural response and cost characterization of bridge construction using seismic performance enhancement strategies. PhD thesis, University of California, Berkeley, USA.
Awuku, B; Asa, E and Baffoe-Twum, E (2024) Conceptual cost estimation of highway bid unit prices using ordinary kriging. International Journal of Construction Management, 24(3), pp. 351-360. ISSN 1562-3599
Awuku, B; Asa, E; Baffoe-Twum, E and Essegbey, A (2024) Conceptual cost estimation of highway bid items: a systematic literature review. Engineering, Construction and Architectural Management, 31(3), pp. 1187-1221. ISSN 0969-9988
Awwad, R E (2010) Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics. PhD thesis, University of Michigan, USA.
Ayat, M; Rehman, H; Qureshi, S M and Kang, C W (2023) Assessing the causes of project overruns in tunnel construction projects in Pakistan. International Journal of Construction Management, 23(11), pp. 1856-1866. ISSN 1562-3599
Aydinli, S (2024) Impact of unexpected conditions on construction cost forecasting performance: evidence from Europe. Construction Management and Economics, 42(9), pp. 787-801. ISSN 01446193
Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.
Ayinla, K; Cheung, F and Tawil, R A (2019) Towards an ontology-based approach to measuring productivity for offsite manufacturing method. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Ayinla, K; Cheung, F and Towe, B (2025) Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding. Construction Management and Economics, 43(8), pp. 637-656. ISSN 0144-6193
Ayinla, K; Saka, A; Seidu, R and Madanayake, U (2023) The impact of artificial intelligence on construction costing practice. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Ayodele, E O (2017) Development of a framework in minimising errors in construction documents in Nigeria. PhD thesis, University of Salford, UK.
Ayodele, O L; Sanusi, K O and Kahn, M T (2019) Nuclear battery: a source of environmentally friendly energy. Journal of Engineering, Design and Technology, 17(1), pp. 172-182. ISSN 1726-0531
Ayodele, T R (2025) Cost of selected smart building elements and its level of implementation in Abuja. Journal of Financial Management of Property and Construction, 30(2), pp. 335-355. ISSN 1366-4387
Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.
Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364
Ayyub, B M and Haidar, A (1985) Decisions in construction operations. Journal of Construction Engineering and Management, 111(4), pp. 343-357. ISSN 0733-9364
Azadeh, A; Kalantari, M; Ahmadi, G and Eslami, H (2019) A flexible genetic algorithm-fuzzy regression approach for forecasting: The case of bitumen consumption. Construction Innovation, 19(1), pp. 71-88. ISSN 1471-4175
Azambuja, M M B (2009) A decision support system for rapid evaluation and selection of engineered equipment suppliers. PhD thesis, University of Texas at Austin, USA.
Azcarate Aguerre, J F (2023) Facades-as-a-service: A cross-disciplinary model for the (re)development of circular building envelopes. PhD thesis, Delft University of Technology, Netherlands.
Azeem, S; Naeem, M A; Waheed, A and Thaheem, M J (2017) Examining barriers and measures to promote the adoption of green building practices in Pakistan. Smart and Sustainable Built Environment, 6(3), pp. 86-100. ISSN 2046-6099
Azharuddin, M (2019) Integrated carbon emission management for the United Arab Emirates construction industry. PhD thesis, Heriot-Watt University, UK.
Azim, S W (2011) Understanding and managing project complexity. PhD thesis, University of Manchester, UK.
Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects. PhD thesis, University of Alberta, Canada.
Aziz, A M A (2008) Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects. Construction Management and Economics, 26(5), pp. 507-529. ISSN 1466433X
Azman, M A; Abdul-Samad, Z; Lee, B L; Skitmore, M; Rajendra, D and Chuweni, N N (2024) How technological, environmental and managerial performance contribute to the productivity change of Malaysian construction firms. Engineering, Construction and Architectural Management, 31(2), pp. 618-637. ISSN 0969-9988
Azman, M A; Chuweni, N N; Halil, F M; Ku Mohammad Asyraf Ku, A; Lee, B L; Farah Nazira, J and Skitmore, M (2024) The impact of the change in institutional regulation on construction productivity: Firm-level evidence in a developing economy. Construction Management and Economics, 42(3), pp. 199-214. ISSN 01446193
Azzazy, S; Ghaffarianhoseini, A; GhaffarianHoseini, A; Naismith, N; Doan, D T and Hollander, J B (2025) The significance of indoor thermal comfort on occupants' perception: In university buildings in auckland, New Zealand. Building Research & Information, 53(1-2), pp. 19-39. ISSN 0961-3218
Babaei, M; Rashidi-Baqhi, A and Rashidi, M (2022) Estimating project cost under uncertainty using universal generating function method. Journal of Construction Engineering and Management, 148(2): 04021194, ISSN 0733-9364
Babakhani, J and Veysi, F (2024) Investigation and optimization of forced convective heat transfer around a tall building using experimental results. International Journal of Building Pathology and Adaptation, 42(5), pp. 893-913. ISSN 2398-4708
Babalola, I H; Aigbavboa, C O; Aliu, J and Oke, A E (2025) Influence of emotional intelligence attributes on human resource management practices implementation in the Nigerian construction industry. Journal of Engineering, Design and Technology, 23(3), pp. 935-952. ISSN 1726-0531
Babalola, O and Adesanya, D A (2007) An evaluation of the level of accuracy of electrical services cost estimates in Nigeria. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Babar, S; Thaheem, M J and Ayub, B (2017) Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3): 04016104, ISSN 0733-9364
Babatunde, S O; Ekundayo, D; Adekunle, A O and Bello, W (2020) Comparative analysis of drivers to BIM adoption among AEC firms in developing countries: A case of Nigeria. Journal of Engineering, Design and Technology, 18(6), pp. 1425-1447. ISSN 1726-0531
Babatunde, S O; Ekundayo, D; Babalola, O and Jimoh, J A (2018) Analysis of the drivers and benefits of BIM incorporation into quantity surveying profession: Academia and students' perspectives. Journal of Engineering, Design and Technology, 16(5), pp. 750-766. ISSN 1726-0531
Babatunde, S O; Ekundayo, D; Udeaja, C and Abubakar, U O (2022) An investigation into the sustainability practices in PPP infrastructure projects: A case of Nigeria. Smart and Sustainable Built Environment, 11(1), pp. 110-125. ISSN 2046-6099
Babatunde, S O; Perera, S; Ekundayo, D and Adeleke, D S (2020) An investigation into BIM uptake among contracting firms: An empirical study in Nigeria. Journal of Financial Management of Property and Construction, 26(1), pp. 23-48. ISSN 1366-4387
Babatunde, S O; Perera, S; Ekundayo, D and Adeleye, T E (2020) An investigation into BIM-based detailed cost estimating and drivers to the adoption of BIM in quantity surveying practices. Journal of Financial Management of Property and Construction, 25(1), pp. 61-81. ISSN 1366-4387
Babatunde, S O; Udeaja, C and Adekunle, A O (2021) Barriers to BIM implementation and ways forward to improve its adoption in the Nigerian AEC firms. International Journal of Building Pathology and Adaptation, 39(1), pp. 48-71. ISSN 23984708
Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099
Baborska-Narozny, M; Szulgowska-Zgrzywa, M; Mokrzecka, M; Chmielewska, A; Fidorow-Kaprawy, N; Stefanowicz, E; Piechurski, K and Laska, M (2020) Climate justice: Air quality and transitions from solid fuel heating. Buildings & Cities, 1(1), pp. 120-140. ISSN 2632-6655
Baby, S.; Talebi, S.; Lai, J. H. K.; Tien, P. W. and Kagioglou, M. M. (2026) Mitigating cost estimation challenges in bahrain's construction industry: A problem-solving approach. Built Environment Project and Asset Management, 16(3), pp. 542-560. ISSN 2044-124X
Baccarini, D (2004) Estimating project cost contingency: A model and exploration of research questions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Baccarini, D and Love, P E D (2014) Statistical characteristics of cost contingency in water infrastructure projects. Journal of Construction Engineering and Management, 140(3): 4013063, ISSN 0733-9364
Back, W E; Boles, W W and Fry, G T (2000) Defining triangular probability distributions from historical cost data. Journal of Construction Engineering and Management, 126(1), pp. 29-37. ISSN 0733-9364
Bacon, M (2014) Occupancy analytics: A new basis for low-energy-low-carbon hospital design and operation in the UK. Architectural Engineering and Design Management, 10(1-2), pp. 146-163. ISSN 1745-2007
Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029
Badawy, M; Hussein, A; Elseufy, S M and Alnaas, K (2021) How to predict the rebar labours' production rate by using ANN model. International Journal of Construction Management, 21(4), pp. 427-438. ISSN 1562-3599
Badenfelt, U (2007) Trust and control in the early phases of target cost contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Badra, N; Hegazy, H; Mousa, M; Zhang, J; Syed Zakaria, S A; Aboul Haggag, S and Abdul-Rashied, I (2025) Preliminary cost forecasting and optimization for the construction of steel pedestrian bridges in Egypt. Engineering, Construction and Architectural Management, 32(4), pp. 2210-2241. ISSN 0969-9988
Bae, J (2025) Supervised learning to covering cost risk through post-construction evaluation of transportation projects by project delivery methods. Engineering, Construction and Architectural Management, 32(9), pp. 5863-5884. ISSN 0969-9988
Bae, Y J (2016) Integrated design tool of building system optimization for building life cycle cost. PhD thesis, Purdue University, USA.
Baek, M and Ashuri, B (2019) Analysis of the variability of submitted unit price bids for asphalt line items in highway projects. Journal of Construction Engineering and Management, 145(4): 04019020, ISSN 0733-9364
Baghdadi, A M A (2017) The allocation of risks in the Saudi Arabian domestic and regional aviation construction projects. PhD thesis, Robert Gordon University, UK.
Bagheri-Zadeh, S H; Kim, H; Hounsell, S; Wood, C R; Soleymani, H and King, M (2007) Field study of concrete maturity methodology in cold weather. Journal of Construction Engineering and Management, 133(11), pp. 827-835. ISSN 0733-9364
Bai, S; Li, M; Lu, Q; Tian, H and Qin, L (2022) Global time optimization method for dredging construction cycles of trailing suction hopper dredger based on grey system model. Journal of Construction Engineering and Management, 148(2): 04021198, ISSN 0733-9364
Baiden, B K (2006) Framework for the integration of the project delivery team. PhD thesis, Loughborough University, UK.
Bajaj, D; Oluwoye, J and Lenard, D (1997) An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management and Economics, 15(4), pp. 363-369. ISSN 01446193
Bajere, P A (1996) Maintenance conditions and occupant behavior in government-provided housing in Lagos, Nigeria. DIT thesis, University of Northern Iowa, USA.
Baker, H (2021) A multimethod approach to learning from text-based construction failure data. PhD thesis, University of Edinburgh, UK.
Baker, L M (1984) A labor market model to manage costs risk in construction project management. PhD thesis, Colorado School of Mines, USA.
Bakhshi Khayani, P (2011) A Bayesian model for controlling cost overrun in a portfolio of construction projects. PhD thesis, Northeastern University, USA.
Bala, K; Bustani, S A and Waziri, B S (2014) A computer-based cost prediction model for institutional building projects in Nigeria: An artificial neural network approach. Journal of Engineering, Design and Technology, 12(4), pp. 519-530.
Balali, A; Moehler, R C and Valipour, A (2022) Ranking cost overrun factors in the mega hospital construction projects using Delphi-swara method: An Iranian case study. International Journal of Construction Management, 22(13), pp. 2577-2585. ISSN 1562-3599
Balali, V; Zalavadia, A and Heydarian, A (2020) Real-time interaction and cost estimating within immersive virtual environments. Journal of Construction Engineering and Management, 146(2): 04019098, ISSN 0733-9364
Baldauf, J P; Formoso, C T and Tzortzopoulos, P (2021) Method for managing requirements in healthcare projects using building information modelling. Engineering, Construction and Architectural Management, 28(8), pp. 2090-2118. ISSN 0969-9988
Baldwin, A N (1982) Computer aided estimating for civil engineering contractors. PhD thesis, Loughborough University, UK.
Baldwin, A N; Austin, S A and Pendlebury, M C (1997) Interface of early design and cost advice in the building design process. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Ball, M and Wood, A (1995) How many jobs does construction expenditure generate? Construction Management and Economics, 13(4), pp. 307-318. ISSN 01446193
Ballal, T M A (1999) The use of artificial neural networks for modelling buildability in preliminary structural design. PhD thesis, Loughborough University, UK.
Ballard, G (2002) Managing work flow on design projects: A case study. Engineering, Construction and Architectural Management, 9(3), pp. 284-291. ISSN 0969-9988
Ballesteros-Pérez, P (2017) M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063, ISSN 0733-9364
Ballesteros-Pérez, P; González-Cruz, M C; Fuentes-Bargues, J L and Skitmore, M (2015) Analysis of the distribution of the number of bidders in construction contract auctions. Construction Management and Economics, 33(9), pp. 752-770. ISSN 01446193
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Cerezo-Narváez, A; Lucko, G; Pastor-Fernández, A; Otero-Mateo, M and Contreras-Samper, J P (2020) Forecasting accuracy of in-progress activity duration and cost estimates. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364
Ballesteros-Pérez, P and Skitmore, M (2016) Estimating the number of new and repeated bidders in construction auctions. Construction Management and Economics, 34(12), pp. 919-934. ISSN 01446193
Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; González-Cruz, M C; Pastor-Fernández, A and Otero-Mateo, M (2021) Standard deviation of bids for construction contract auctions. Journal of Construction Engineering and Management, 147(8): 04021096, ISSN 0733-9364
Ballesteros-Pérez, P; Skitmore, M; Das, R and Del Campo-Hitschfeld, M L (2015) Quick abnormal-bid-detection method for construction contract auctions. Journal of Construction Engineering and Management, 141(7): 4015010, ISSN 0733-9364
Ballesteros-Pérez, P; Skitmore, M; Sanz-Ablanedo, E and Verhoeven, P (2019) Forecasting the number and distribution of new bidders for an upcoming construction auction. Journal of Construction Engineering and Management, 145(10): 040190561, ISSN 0733-9364
Ballesteros-Pérez, P; del Campo-Hitschfeld, M L; González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621. ISSN 0969-9988
Balogun, T B (2018) Integrating bridge maintenance life cycle assessments into bridge design for improved sustainable decision making. PhD thesis, University of the West of England, Bristol, UK.
Baloi, D (2002) A framework for managing global risk factors affecting construction cost performance. PhD thesis, Loughborough University, UK.
Banawi, A and Bilec, M M (2014) A framework to improve construction processes: Integrating lean, green and six sigma. International Journal of Construction Management, 14(1), pp. 45-55. ISSN 1562-3599
Bangaru, S S (2021) Fatigue monitoring through wearable sensors for construction workers. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Banik, G C (2001) Construction productivity improvement: Current US perspective. Journal of Construction Procurement, 7(2), pp. 60-71. ISSN 1358-9180
Bansal, V K and Pal, M (2009) Extended GIS for construction engineering by adding direct sunlight visualisations on buildings. Construction Innovation, 9(4), pp. 406-419. ISSN 1471-4175
Banwo, O O (2022) Development of a framework for building cost information management in Nigeria. PhD thesis, Coventry University, UK.
Baqerin, M H; Shafahi, Y and Kashani, H (2016) Application of Weibull analysis to evaluate and forecast schedule performance in repetitive projects. Journal of Construction Engineering and Management, 142(2): 04015058, ISSN 0733-9364
Barati, K; Shen, X; Li, N and Carmichael, D G (2022) Automatic mass estimation of construction vehicles by modeling operational and engine data. Journal of Construction Engineering and Management, 148(3): 4021208, ISSN 0733-9364
Barati, Khalegh (2018) Modeling fuel use, emissions and mass of on-road construction equipment through monitoring field operations. PhD thesis, University of New South Wales, Australia.
Barbachyn, S M; Devine, R D; Thrall, A P and Kurama, Y C (2017) Economic evaluation of high-strength materials in stocky reinforced concrete shear walls. Journal of Construction Engineering and Management, 143(10): 04017074, ISSN 0733-9364
Barbosa, P S F and Pimentel, P R (2001) A linear programming model for cash flow management in the Brazilian construction industry. Construction Management and Economics, 19(5), pp. 469-479. ISSN 01446193
Barnes, N M L (1971) The design and use of experimental bills of quantities for civil engineering contracts. PhD thesis, University of Manchester, UK.
Barot, B (2002) Growth and business cycles for the Swedish economy. Journal of Construction Research, 3(2), pp. 217-253. ISSN 1609-9451
Barqawi, M; Chong, H Y and Lopez, R (2023) Effects of critical success factors, BIM implementation strategies, and barriers on employer-initiated delays. International Journal of Construction Management, 23(16), pp. 2788-2803. ISSN 1562-3599
Barra, B. Q.; Soares, C. A. P.; de Castro, I. P. and Longo, O. C. (2026) Framework for extracting project quantities for construction cost estimation using 5D BIM in an openBIM environment. Journal of Engineering, Design and Technology, pp. 1-24. ISSN 1726-0531
Barraza, G A (2011) Probabilistic estimation and allocation of project time contingency. Journal of Construction Engineering and Management, 137(4), pp. 259-265. ISSN 0733-9364
Barraza, G A; Back, W E and Mata, F (2000) Probabilistic monitoring of project performance using ss-curves. Journal of Construction Engineering and Management, 126(2), pp. 142-148. ISSN 0733-9364
Barraza, G A; Back, W E and Mata, F (2004) Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25-32. ISSN 0733-9364
Barraza, G A and Bueno, R A (2007) Probabilistic control of project performance using control limit curves. Journal of Construction Engineering and Management, 133(12), pp. 957-965. ISSN 0733-9364
Barrientos-Orellana, A; Ballesteros-Pérez, P; Mora-Melia, D; González-Cruz, M C and Vanhoucke, M (2022) Stability and accuracy of deterministic project duration forecasting methods in earned value management. Engineering, Construction and Architectural Management, 29(3), pp. 1449-1469. ISSN 0969-9988
Bartlett, E and Howard, N (2000) Informing the decision makers on the cost and value of green building. Building Research & Information, 28(5-6), pp. 315-324. ISSN 0961-3218
Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.
Basha, I M and Gab-Allah, A A (1991) Value engineering in Egyptian bridge construction. Journal of Construction Engineering and Management, 117(3), pp. 393-401. ISSN 0733-9364
Basha, M (2021) Intra-sector firm performance and its determinants in the UK construction industry. PhD thesis, University of Westminster, UK.
Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364
Batarseh, Sana (2025) An approach to adjusting design build for the modern construction industry. PhD thesis, Arizona State University, USA.
Bates, W and Dawood, N N (1998) Development of a risk allocation strategy for construction in the process industry: A knowledge approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.
Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.
Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.
Bayandor, S; Kalatehjari, R; Akherati, R and Kasebzadeh, J (2025) Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects. Built Environment Project and Asset Management, 15(2), pp. 309-336. ISSN 2044-124X
Bayrak, T and Kaka, A (2004) Evaluation of digital photogrammetry and 3D CAD modelling applications in construction management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Bayraktar, M E; Arif, F; Ponder, D; Prozzi, J and Mahmoud, N V (2016) Opportunities for value extraction projects in highway rights-of-way and development of feasibility assessment tool. Journal of Construction Engineering and Management, 142(8): 4016023, ISSN 0733-9364
Bayraktar, M E and Hastak, M (2010) Scoring approach to construction bond underwriting. Journal of Construction Engineering and Management, 136(9), pp. 957-967. ISSN 0733-9364
Bayram, S and Al-Jibouri, S (2016) Efficacy of estimation methods in forecasting building projects' costs. Journal of Construction Engineering and Management, 142(11): 05016012, ISSN 0733-9364
Bayram, S and Al-Jibouri, S (2018) Cost forecasting using RCF: A case study for planning public building projects costs in Turkey. International Journal of Construction Management, 18(5), pp. 405-417. ISSN 1562-3599
Beadle, K (2008) Analysis of the design process for low-energy housing. PhD thesis, De Montfort University, UK.
Beainy, F; Commuri, S and Zaman, M (2012) Quality assurance of hot mix asphalt pavements using the intelligent asphalt compaction analyzer. Journal of Construction Engineering and Management, 138(2), pp. 178-187. ISSN 0733-9364
Becker, P E (2000) Modeling construction worker chemical exposures for compliance with OSHA permissible exposure limits: An investigation of lead exposures to highway bridge maintenance workers. DSc thesis, University of Massachusetts Lowell, USA.
Becker, T C (2012) Improving the predictability of construction project outcomes through project level indirect construction cost practices. PhD thesis, North Carolina State University, USA.
Becker, T C; Jaselskis, E J and El-Gafy, M (2014) Improving predictability of construction project outcomes through intentional management of indirect construction costs. Journal of Construction Engineering and Management, 140(6): 4014014, ISSN 0733-9364
Beeston, D (1986) Combining risks in estimating. Construction Management and Economics, 4(1), pp. 75-79. ISSN 01446193
Beg, M A (1999) An economic based decision support system for project level pavement type selection. PhD thesis, University of Texas at Austin, USA.
Beheiry, S M A; Chong, W K and Haas, C T (2006) Examining the business impact of owner commitment to sustainability. Journal of Construction Engineering and Management, 132(4), pp. 384-392. ISSN 0733-9364
Behzadi, N and Fadeyi, M O (2012) A preliminary study of indoor air quality conditions in Dubai public elementary schools. Architectural Engineering and Design Management, 8(3), pp. 192-213. ISSN 1745-2007
Belay, A M and Torp, O (2023) Construction cost performance under quality-gated framework: The cases of Norwegian road constructions. International Journal of Construction Management, 23(6), pp. 1030-1043. ISSN 1562-3599
Belhadj, T A (1989) Computer aided architectural evaluation and design: a cost modelling experiment. PhD thesis, University of Sheffield, UK.
Beliveau, Y J (1984) A cost control model for on-site work activities for construction (estimating, cost-codes, forms). PhD thesis, Purdue University, USA.
Bell, L C and McCullouch, B G (1988) Bar code applications in construction. Journal of Construction Engineering and Management, 114(2), pp. 263-278. ISSN 0733-9364
Bello, A O; Olanrewaju, O I; Gbenga, P O; Khan, A A and Isa, R B (2025) Exploring the barriers to digital twin adoption in the Nigerian construction industry: A structural equation modelling approach. Journal of Engineering, Design and Technology, 23(5), pp. 1541-1572. ISSN 1726-0531
Bello, N A; Agava, Y H and Olanrele, O O (2021) Investment property typology analysis; evidence from Nigerian urban property returns and macroeconomic variables. African Journal of Built Environment Research, 5(1), pp. 77-96. ISSN 2414-0236
Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.
Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.
Bello W A, O K T (2013) Weak management of the predictability of contingency allowance in construction projects in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Belniak, S; Leśniak, A; Plebankiewicz, E and Zima, K (2013) The influence of the building shape on the costs of its construction. Journal of Financial Management of Property and Construction, 18(1), pp. 90-102. ISSN 1366-4387
Belusko, M; Timothy, M and Leary, O (2010) Cost analyses of measures to improve residential energy ratings to 6 stars: Playford North development, South Australia. Construction Economics and Building, 10(1-2), pp. 36-47. ISSN 2204-9029
Bender, W J (2000) A risk-based cost control methodology for constructing complex structures with the mobile offshore base as a case study. PhD thesis, University of Maryland, College Park, USA.
Benjamin, Neal B H (1969) Competitive bidding for building construction contracts. PhD thesis, Stanford University, USA.
Benjaoran, V; Dawood, N and Scott, D (2004) Bespoke precast productivity estimation with neural network model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193
Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099
Bentley, D (2000) Control and emergence: The paradox of construction management. PhD thesis, University of Hertfordshire, UK.
Bentley, D and Stacey, R (1998) The potential for applying complex adaptive systems theory to the process of estimating in the construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Berg, R and Hinze, J (2005) Theft and vandalism on construction sites. Journal of Construction Engineering and Management, 131(7), pp. 826-833. ISSN 0733-9364
Berglund-Brown, J; Dobie, I; Hewitt, J; De Wolf, C and Ochsendorf, J (2025) Lifetimes of demolished buildings in US and European cities. Buildings & Cities, 6(1), pp. 1099-1116. ISSN 2632-6655
Bergsdal, H; Brattebø, H and Müller, D B (2014) Dynamic material flow analysis for PCBs in the Norwegian building stock. Building Research & Information, 42(3), pp. 359-370. ISSN 0961-3218
Bernie, J and Howes, R (1983) Project management control using real-time budgeting and forecasting models. Construction Papers, 2(1), pp. 19-40. ISSN 0144-8587
Berny, J (1988) Forecasting and risk analysis applied to management planning and control. PhD thesis, Aston University, UK.
Besiktepe, D; Sparkling, A; Debs, L and Manuel, R (2024) Digital technology applications in construction education: A systematic review of methodological pluralism. International Journal of Construction Education and Research, 20(4), pp. 421-443. ISSN 1557-8771
Besklubova, S; Kravchenko, E; Kasprzhitskii, A; Lazorenko, G and Zhong, R Y (2026) Establishing a market for carbon-neutral technology in concrete waste recycling by sequestering flue co 2: An evolutionary game theory-based case study in Hong Kong. Journal of Construction Engineering and Management, 152(4): 04026017, ISSN 0733-9364
Best, Eric A (2008) The development and testing of a purchasing power parity method for comparing construction costs internationally. PhD thesis, University of Technology Sydney, Australia.
Best, R (2010) Using purchasing power parity to assess construction productivity. Construction Economics and Building, 10(4), pp. 1-10. ISSN 2204-9029
Best, R (2011) Developing a basket of resources as a tool for collecting construction cost data internationally. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Best, R (2012) International comparisons of cost and productivity in construction: A bad example. Construction Economics and Building, 12(3), pp. 82-88. ISSN 2204-9029
Best, R and Langston, C (2006) Evaluation of construction contractor performance: A critical analysis of some recent research. Construction Management and Economics, 24(4), pp. 439-445. ISSN 01446193
Bettemir, Ö H and Birgonul, M T (2025) Solution of discrete time–cost trade-off problem with adaptive search domain. Engineering, Construction and Architectural Management, 32(2), pp. 1032-1052. ISSN 0969-9988
Bhagwat, K and Delhi, V S K (2023) Review of construction safety performance measurement methods and practices: A science mapping approach. International Journal of Construction Management, 23(4), pp. 729-743. ISSN 1562-3599
Bhargava, A (2009) A probabilistic evaluation of highway project costs. PhD thesis, Purdue University, USA.
Bhargava, A; Anastasopoulos, P C; Labi, S; Sinha, K C and Mannering, F L (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), pp. 1207-1218. ISSN 0733-9364
Bhaumik, P K (2016) Developing and using a new family of project S-curves using early and late shape parameters. Journal of Construction Engineering and Management, 142(12): 04016076, ISSN 0733-9364
Bhokha, S and Ogunlana, S O (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering, Construction and Architectural Management, 6(2), pp. 133-144. ISSN 0969-9988
Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364
Bidanset, P; McCord, M; Davis, P and Sunderman, M (2019) An exploratory approach for enhancing vertical and horizontal equity tests for ad valorem property tax valuations using geographically weighted regression. Journal of Financial Management of Property and Construction, 24(2), pp. 231-250. ISSN 1366-4387
Bienvenido-Huertas, D; Rubio-Bellido, C; Sánchez-García, D and Moyano, J (2019) Internal surface condensation risk in façades of Spanish social dwellings. Building Research & Information, 47(8), pp. 928-947. ISSN 0961-3218
Biltonen, E F (2001) Cost-benefit analysis of a flood protection project incorporating poverty alleviation concerns: Case study Vietnam. PhD thesis, Colorado State University, USA.
Bin Bandi, S (2014) Review on the fundamental usage of bills of quantities (BQ) by contracting organisations. Construction Economics and Building, 14(1), pp. 118-131. ISSN 2204-9029
Birchall, S J (2011) An appraisal of the performance of a 'green' office building. PhD thesis, University of Leeds, UK.
Bird, B (1987) Costs-in-use: Principles in the context of building procurement. Construction Management and Economics, 5(4), ISSN 01446193
Birnie, J (1996) Bias and financial management judgements. Journal of Financial Management of Property and Construction, 1(1), pp. 37-54. ISSN 1366-4387
Birnie, J and Yates, A (1991) Cost prediction using decision/risk analysis methodologies. Construction Management and Economics, 9(2), pp. 171-186. ISSN 01446193
Birnie, J W (1993) A behavioural study using decision analysis of building cost prediction by chartered quantity surveyors. PhD thesis, Ulster University, UK.
Birrell, George Selbie (1978) The criteria by which construction prime and subcontractors evaluate the management performance of each other. DArch thesis, University of Michigan, USA.
Biswas, P K; Khan, S M; Piratla, K and Chowdhury, M (2023) Development and evaluation of statistical and machine-learning models for queue-length estimation for lane closures in freeway work zones. Journal of Construction Engineering and Management, 149(5): 04023023, ISSN 0733-9364
Biziorek, S; De Marco, A and Castelblanco, G (2023) Public-private partnership national programs through the portfolio perspective: A system dynamics model of the UK PFI/PF2 programs. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Blackman, I Q and Picken, D H (2010) Height and construction costs of residential high-rise buildings in Shanghai. Journal of Construction Engineering and Management, 136(11), pp. 1169-1180. ISSN 0733-9364
Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. PhD thesis, Abertay University, UK.
Blackwood, D J; Sarkar, S and Price, A D F (1997) A research methodology for modelling construction design service costs. Journal of Construction Procurement, 3(3), pp. 47-67. ISSN 1358-9180
Blackwood, D J; Sarkar, S and Price, A D F (1998) Modelling levels of accuracy in design cost estimation. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Blampied, N B (2018) Parametric functions for conceptual and feasibility estimating in public highway project portfolios. PhD thesis, University of California, Berkeley, USA.
Blanche, K G (1996) Personal and professional characteristics, perceptions of barriers, and strategies of women in different levels of the superintendency. EdD thesis, University of Maryland, College Park, USA.
Blay Jnr, A V K; Kukah, A S K; Opoku, A and Asiedu, R (2023) Impact of competitive strategies on achieving the sustainable development goals: Context of Ghanaian construction firms. International Journal of Construction Management, 23(13), pp. 2209-2220. ISSN 1562-3599
Blayse, A M and Manley, K (2004) Key influences on construction innovation. Construction Innovation, 4(3), pp. 143-154. ISSN 1471-4175
Blismas, N; Pasquire, C and Gibb, A (2006) Benefit evaluation for off-site production in construction. Construction Management and Economics, 24(2), pp. 121-130. ISSN 01446193
Blomberg, D; Cotellesso, P; Sitzabee, W and Thal, A E (2014) Discovery of internal and external factors causing military construction cost premiums. Journal of Construction Engineering and Management, 140(3): 4013060, ISSN 0733-9364
Bloore, R D S (1991) The ascertainment of claims for delay and disruption. PhD thesis, University of Surrey, UK.
Blyth, K and Kaka, A (2006) A novel multiple linear regression model for forecasting S-curves. Engineering, Construction and Architectural Management, 13(1), pp. 82-95. ISSN 0969-9988
Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.
Boadi, R (2020) A best practice framework for public-private partnerships (PPPs) in road projects: the case of Ghana. PhD thesis, University of Salford, UK.
Boateng, P; Ahiaga-Dagbui, D; Chen, Z and Ogunlana, S (2015) Modelling economic risks in megaproject construction: A systemic approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Bobick, T G (2004) Falls through roof and floor openings and surfaces, including skylights: 1992-2000. Journal of Construction Engineering and Management, 130(6), pp. 895-907. ISSN 0733-9364
Bogenstätter, U (2000) Prediction and optimization of life-cycle costs in early design. Building Research & Information, 28(5-6), pp. 376-386. ISSN 0961-3218
Bokor, O (2022) Improving labour productivity in construction. A hybrid machine learning approach. PhD thesis, University of Northumbria at Newcastle, UK.
Bollen, R (2000) Applying quantitative techniques to evaluate residential development profitability. Journal of Financial Management of Property and Construction, 5(1-2), pp. 51-64. ISSN 1366-4387
Bonham, D R (2015) The derivation and implications of a master code of accounts for mechanical piping systems. PhD thesis, University of Colorado at Boulder, USA.
Bonham, D R; Goodrum, P M; Littlejohn, R and Albattah, M A (2017) Application of data mining techniques to quantify the relative influence of design and installation characteristics on labor productivity. Journal of Construction Engineering and Management, 143(8): 04017052, ISSN 0733-9364
Bonilla, M; Castelblanco, G and Rasdorf, W (2026) The paradox of project performance: The role of procurement, contextual, and contractor-related factors. Journal of Construction Engineering and Management, 152(6): 04026062, ISSN 0733-9364
Bonuke, D O (2021) Strategies to improve survival rate among small businesses in the construction industry. PhD thesis, Walden University, USA.
Boo, J H S (2001) Improving the accuracy of approximate estimates of building projects. Building Research & Information, 29(4), pp. 312-318. ISSN 0961-3218
Bordalo, R; De Brito, J; Gaspar, P L and Silva, A (2011) Service life prediction modelling of adhesive ceramic tiling systems. Building Research & Information, 39(1), pp. 66-78. ISSN 0961-3218
Bordass, B (2000) Cost and value: Fact and fiction. Building Research & Information, 28(5-6), pp. 338-352. ISSN 0961-3218
Borg, L (2015) Procurement contracts, innovation and productivity in the construction sector: Five studies. PhD thesis, KTH Royal Institute of Technology, Sweden.
Borg, L and Song, H S (2015) Quality change and implications for productivity development: Housing construction in Sweden 1990-2010. Journal of Construction Engineering and Management, 141(1): 05014014, ISSN 0733-9364
Borg, M (2001) Environmental assessment of materials, components and buildings: Building-specific considerations, open-loop recycling, variations in assessment results and the usage phase of buildings. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.
Borges, W F and Mário, P D C (2017) Five project-duration control methods in time units: Case study of a linearly distributed planned value. Journal of Construction Engineering and Management, 143(6): 05017002, ISSN 0733-9364
Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.
Boukamp, F (2006) Modeling of and reasoning about construction specifications to support automated defect detection. PhD thesis, Carnegie Mellon University, USA.
Bourikas, L; Costanza, E; Gauthier, S; James, P A B; Kittley-Davies, J; Ornaghi, C; Rogers, A; Saadatian, E and Huang, Y (2018) Camera-based window-opening estimation in a naturally ventilated office. Building Research & Information, 46(2), pp. 148-16. ISSN 0961-3218
Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.
Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218
Boussabaine, A H and Elhag, T (1999) Applying fuzzy techniques to cash flow analysis. Construction Management and Economics, 17(6), pp. 745-755. ISSN 01446193
Boussabaine, A H and Elhag, T M S (1999) Knowledge discovery in residential construction project cost data. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Boussabaine, A H; Kirkham, R J and Grew, R G (1999) Estimating the cost of energy usage in sport centres: A comparative modelling approach. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Bowen, P A and Edwards, P J (1998) Building cost planning and cost information management in South Africa. Journal of Construction Procurement, 4(1), pp. 16-26. ISSN 1358-9180
Bowen, R M (1978) Valuation of capitalized interest on construction expenditures in the electric utility industry. PhD thesis, Stanford University, USA.
Bower, D A (1995) The creation of a proactive link between time and money. PhD thesis, University of Manchester, UK.
Bowlby, R L and Schriver, W R (1986) Observations on productivity and composition of building construction output in the United States, 1972-82. Construction Management and Economics, 4(1), pp. 1-18. ISSN 01446193
Boyd, D and Bentley, D (2012) A critique of conceptions of design and management in construction projects. Construction Management and Economics, 30(6), pp. 441-454. ISSN 1466433X
Bradley, P E and Kohler, N (2007) Methodology for the survival analysis of urban building stocks. Building Research & Information, 35(5), pp. 529-542. ISSN 0961-3218
Brady, L (2019) An investigation into the management of energy performance for building services systems: design to operation. PhD thesis, Liverpool John Moores University, UK.
Brady, L and Hanmer-Dwight, R (2016) The management and control of energy at the design stage of buildings. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Braimah, N (2008) An investigation into the use of construction delay and disruption analysis methodologies. PhD thesis, University of Wolverhampton, UK.
Brandon, P S (1984) Cost versus quality: A zero sum game? Construction Management and Economics, 2(2), pp. 111-126. ISSN 01446193
Brandon, P S (1990) The development of an expert system for the strategic planning of construction projectss. Construction Management and Economics, 8(3), pp. 285-300. ISSN 01446193
Bray Jr., H G (1994) Domestic construction contractors and ISO 9000 registration. DE thesis, Louisiana Tech University, USA.
Brchner, J and Olofsson, T (2012) Construction productivity measures for innovation projects. Journal of Construction Engineering and Management, 138(5), pp. 670-677. ISSN 0733-9364
Brett-Jones, A T (1983) Barchester low rise: A case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(2), pp. 91-117. ISSN 01446193
Brewer, G; Gajendran, T; Jefferies, M; McGeorge, D; Rowlinson, S and Dainty, A (2013) Value through innovation in long-term service delivery: Facility management in an Australian PPP. Built Environment Project and Asset Management, 3(1), pp. 74-88. ISSN 2044-124X
Briggs, B (2021) An improved earned value management method integrating quality and safety. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Brilakis, I and Soibelman, L (2006) Multimodal image retrieval from construction databases and model-based systems. Journal of Construction Engineering and Management, 132(7), pp. 777-785. ISSN 0733-9364
Brizendine, A L (1997) Risk based analysis of levees. PhD thesis, West Virginia University, USA.
Broadhurst, S J (2000) Non-man-entry sewer renovation robot characteristics. PhD thesis, Sheffield Hallam University, UK.
Brocklesby, M (1999) The environmental impact of frame materials: an assessment of the embodied impacts for building frames in the UK construction industry. PhD thesis, University of Sheffield, UK.
Bromilow, F J and Pawsey, M R (1987) Life cycle cost of university buildings. Construction Management and Economics, 5(4), ISSN 01446193
Brown, D C (2003) Novel method of excavation. Journal of Construction Engineering and Management, 129(2), pp. 222-225. ISSN 0733-9364
Browning, F R (1994) Planning system for hazardous waste site characterization. PhD thesis, University of Missouri - Rolla, USA.
Bruce-Konuah, A; Jones, R V and Fuertes, A (2023) A method for estimating scheduled and manual override heating behaviour and settings from measurements in low energy UK homes. International Journal of Building Pathology and Adaptation, 41(1), pp. 25-44. ISSN 23984708
Brunes, F (2015) Essays on behavioural economics and cost overuns. PhD thesis, KTH Royal Institute of Technology, Sweden.
Brunso, T P and Siddiqi, K M (2003) Using benchmarks and metrics to evaluate project delivery of environmental restoration programs. Journal of Construction Engineering and Management, 129(2), pp. 119-130. ISSN 0733-9364
Bu, Z; Liu, J and Liu, J (2025) Impact of emotions on the behavioral strategies of PPP project stakeholders: An rdeu evolutionary game analysis. Engineering, Construction and Architectural Management, 32(4), pp. 2242-2271. ISSN 0969-9988
Bu-Qammaz, A S A S (2015) Risk management model for international public construction joint venture projects in Kuwait. PhD thesis, Ohio State University, USA.
Budawara, N (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University, Canada.
Bugg, R A and Redden, L W (2020) Assessment and improvement of a required construction management service-learning course. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Bukari, C; Kheni, N A; Boateng, I; Owusu-Ansah, C M and Simpson, K B (2026) Integrating knowledge management with total quality management to enhance construction project delivery in Ghana. Construction Economics and Building, 26(1), ISSN 2204-9029
Buli, L G (2017) Strategies for improving labor productivity in construction companies. PhD thesis, Walden University, USA.
Bullen, P and Love, P (2011) A new future for the past: A model for adaptive reuse decision-making. Built Environment Project and Asset Management, 1(1), pp. 32-44. ISSN 2044-124X
Burati, J L; Farrington, J J and Ledbetter, W B (1992) Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), pp. 34-49. ISSN 0733-9364
Burfoot, M; GhaffarianHoseini, A; Ghaffarianhoseini, A and Naismith, N (2024) Passive variable acoustic technology for classroom reverberation time: A case study. Smart and Sustainable Built Environment, 13(6), pp. 1450-1472. ISSN 2046-6099
Burke, R (2014) Risk management in Republic of Ireland PPP toll roads. PhD thesis, Queen's University Belfast, UK.
Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences. PhD thesis, University of South Wales, UK.
Büchmann-Slorup, R (2014) Applying critical chain buffer management theory in location-based management. Construction Management and Economics, 32(6), pp. 506-519. ISSN 01446193
Cadenazzi, T; Keles, B; Rahman, M K and Nanni, A (2022) Life-cycle cost and life-cycle assessment of a monumental fiber-reinforced polymer reinforced concrete structure. Journal of Construction Engineering and Management, 148(9): 05022007, ISSN 0733-9364
Cai, J; Yang, L; Zhang, Y; Li, S and Cai, H (2021) Multitask learning method for detecting the visual focus of attention of construction workers. Journal of Construction Engineering and Management, 147(7): 04021063, ISSN 0733-9364
Cai, Q; Hu, Q and Ma, G (2021) Improved hybrid reasoning approach to safety risk perception under uncertainty for mountain tunnel construction. Journal of Construction Engineering and Management, 147(9): 04021105, ISSN 0733-9364
Cakan, H (2012) Analysis and modeling of roofer and steel worker fall accidents. PhD thesis, Wayne State University, USA.
Calahorra Jiménez, M I (2020) Advancing knowledge of design-build and best-value in highway projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.
Calzadilla, E; Awinda, K and Parkin, A (2012) An examination of the risk management process in Venezuelan construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Campo, S (2002) Asymmetry and risk aversion in first -price sealed bid auctions: Identification, estimation, and applications. PhD thesis, University of Southern California, USA.
Cantarelli, C C (2011) Cost overruns in large-scale transport infrastructure projects: A theoretical and empirical exploration for the Netherlands and worldwide. PhD thesis, Delft University of Technology, Netherlands.
Cao, J; Said, H; Savov, A and Hall, D (2024) Graph-based evolutionary search for optimal hybrid modularization of building construction projects. Journal of Construction Engineering and Management, 150(8): 04024098, ISSN 0733-9364
Cao, M T; Cheng, M Y and Wu, Y W (2015) Hybrid computational model for forecasting Taiwan construction cost index. Journal of Construction Engineering and Management, 141(4): 04014089, ISSN 0733-9364
Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364
Capace, Brunella (2019) NDT application in transport asset management: Qa/qc performance specifications in pavement construction and maintenance. PhD thesis, Università degli Studi di Catania, Italy.
Capano, C D (2007) Construction operations analysis for development of historical cost databases. PhD thesis, Marquette University, USA.
Carey, G (2017) An evaluation of how VfM can be achieved from a government's perspective in relation to school building projects in Ireland. PhD thesis, University of Salford, UK.
Cariño, J M N and Garciano, L E O (2020) Proposed evacuation safety index (ESI) for school buildings. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 309-328. ISSN 1759-5916
Carmichael, D G and Mustaffa, N K (2018) Emissions and production penalties/bonuses associated with non-standard earthmoving loading policies. Construction Innovation, 18(2), pp. 227-245. ISSN 1471-4175
Carmo, Cristiano Saad Travassos do (2023) A hybrid solution using stochastic and neural networks modeling for the consideration of safety uncertainties in construction planning methods. PhD thesis, Pontifícia Universidade Católica do Rio de Janeiro, Brazil.
Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.
Carr, P G (2005) Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders. Journal of Construction Engineering and Management, 131(11), pp. 1165-1172. ISSN 0733-9364
Carr, R I (1983) Impact of number of bidders on competition. Journal of Construction Engineering and Management, 109(1), pp. 61-73. ISSN 0733-9364
Carr, R I (1989) Cost-estimating principles. Journal of Construction Engineering and Management, 115(4), pp. 545-551. ISSN 0733-9364
Carr, R I (2000) Construction congestion cost (CO3) basic model. Journal of Construction Engineering and Management, 126(2), pp. 105-113. ISSN 0733-9364
Carr, R I (2000) Construction congestion cost (CO3) traffic impact and construction cost. Journal of Construction Engineering and Management, 126(2), pp. 114-121. ISSN 0733-9364
Cartigny, T and Lord, W (2019) Evaluating social value in the UK construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 8-16. ISSN 17514304
Cassandro, J; Mirarchi, C and Pavan, A (2025) A comprehensive literature review of 5D building information modelling using latent dirichlet allocation analysis. Construction Innovation, 25(7), pp. 331-357. ISSN 1471-4175
Castelblanco, G; Fenoaltea, E M; De Marco, A and Chiaia, B (2025) Influence of macroeconomic factors on construction costs: An analysis of project cases. Construction Management and Economics, 43(3), pp. 196-212. ISSN 0144-6193
Castillo, T; Herrera, R F and Alarcón, L F (2023) The quality of small social networks and their performance in architecture design offices. Journal of Construction Engineering and Management, 149(2): 04022162, ISSN 0733-9364
Castro-Lacouture, D (2003) B2b e-work intranet solution design for rebar supply interactions. PhD thesis, Purdue University, USA.
Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.
Cates, G R (2004) Improving project management with simulation and completion distribution functions. PhD thesis, University of Central Florida, USA.
Cattell, D W; Bowen, P A and Kaka, A P (2007) Review of unbalanced bidding models in construction. Journal of Construction Engineering and Management, 133(8), pp. 562-573. ISSN 0733-9364
Cavalcante, Gustavo Henrique Ferreira (2022) Seismic risk analysis of typical bridges located in the northeastern Brazil. PhD thesis, Universidade Estadual de Campinas, Brazil.
Cedstrand, E (2023) Evaluating occupational health interventions: Design, implementation, and effects. PhD thesis, Karolinska Institutet, Sweden.
Celik, T (2014) Developing a building construction associated social cost estimation system for Turkish construction industry. PhD thesis, University of Salford, UK.
Cepeda, D M; Sohail, M and Ogunlowo, O O (2018) Understanding the critical success factors for delivery of megaprojects in Colombia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 45-57. ISSN 17514304
Cesare, C M D and Ruddock, L (1997) Equity in property taxation: A model for establishing a fair property tax system. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Cha, G; Park, S and Oh, T (2019) A terrestrial lidar-based detection of shape deformation for maintenance of bridge structures. Journal of Construction Engineering and Management, 145(12): 04019075, ISSN 0733-9364
Chadee, A A; Martin, H; Chadee, X T; Bahadoorsingh, S and Olutoge, F (2023) Root cause of cost overrun risks in public sector social housing programs in sids: Fuzzy synthetic evaluation. Journal of Construction Engineering and Management, 149(11): 04023106, ISSN 0733-9364
Chahrour, R; Hafeez, M A; Ahmad, A M; Sulieman, H I; Dawood, H; Rodriguez-Trejo, S; Kassem, M; Naji, K K and Dawood, N (2021) Cost-benefit analysis of BIM-enabled design clash detection and resolution. Construction Management and Economics, 39(1), pp. 55-72. ISSN 01446193
Chai, C; De Brito, J; Gaspar, P L and Silva, A (2014) Predicting the service life of exterior wall painting: Techno-economic analysis of alternative maintenance strategies. Journal of Construction Engineering and Management, 140(3): 4013057, ISSN 0733-9364
Chambers, M L (2021) Fine particulate air pollution and accident risk: Three essays. PhD thesis, Vanderbilt University, USA.
Chamikara, K L; Perera, B A K S; Raigama Acharige, D P and Ekanayake, B (2026) Adaptability of BIM technology to mitigate the cost overruns in design and build projects. Construction Innovation, 26(2), pp. 464-490. ISSN 1471-4175
Champion, R (2005) Acceleration in construction and engineering contracts. PhD thesis, University of London, UK.
Chan, A P C; Chan, M W; Oppong, G D; Adabre, M A; Darko, A and Liu, W (2025) Developing a project surveillance system to monitor and control building projects: The case of Hong Kong. International Journal of Construction Management, 25(16), pp. 1952-1967. ISSN 1562-3599
Chan, A P C; Chiang, Y H; Mak, S W K; Choy, L H T and James, M W W (2006) Forecasting the demand for construction skills in Hong Kong. Construction Innovation, 6(1), pp. 3-19. ISSN 1471-4175
Chan, A P C; Chiang, Y H; Wong, F K W; Liang, S and Abidoye, F A (2020) Work-life balance for construction manual workers. Journal of Construction Engineering and Management, 146(5): 04020031, ISSN 0733-9364
Chan, A P C; Lai, M K; Tam, C M and Akintoye, A (2001) Analysis of construction cost variation factors. Journal of Financial Management of Property and Construction, 6(1), pp. 51-60. ISSN 1366-4387
Chan, A P C; Wong, J M W and Chiang, Y H (2003) Modelling labour demand at project level: An empirical study in Hong Kong. Journal of Engineering, Design and Technology, 1(2), pp. 135-150. ISSN 1726-0531
Chan, Albert P C (1996) Determinants of project success in the construction industry of Hong Kong. PhD thesis, University of South Australia, Australia.
Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193
Chan, C T W and Pasquire, C (2002) Estimation of project overheads: A contractor’s perspective. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chan, D W M and Kumaraswamy, M M (1995) A study of the factors affecting construction durations in Hong Kong. Construction Management and Economics, 13(4), pp. 319-333. ISSN 01446193
Chan, E H W and Au, M C Y (2008) Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations. Journal of Construction Engineering and Management, 134(9), pp. 673-680. ISSN 0733-9364
Chan, J K W; Tam, C M and Cheung, R K C (2005) Construction firms at the crossroads in Hong Kong: Going insolvency or seeking opportunity. Engineering, Construction and Architectural Management, 12(2), pp. 111-124. ISSN 0969-9988
Chan, P L (2004) Critical success factors for delivering healthcare projects in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chan, S L and Park, M (2005) Project cost estimation using principal component regression. Construction Management and Economics, 23(3), pp. 295-304. ISSN 01446193
Chan, T K (2011) Comparison of precast construction costs: Case studies in Australia and Malaysia. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Chan, T K and Gao, S (2019) Can we really measure construction productivity? In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Chan, T S-F (1996) Residential construction, liquidity constraints, and monetary policy transmission. PhD thesis, Washington University in St. Louis, USA.
Chan, T-W C (2007) Improving the estimation of project overheads in construction companies in Hong Kong. PhD thesis, Loughborough University, UK.
Chancellor, W and Abbott, M (2015) The Australian construction industry: Is the shadow economy distorting productivity? Construction Management and Economics, 33(3), pp. 176-186. ISSN 01446193
Chancellor, W and Lu, W (2016) A regional and provincial productivity analysis of the Chinese construction industry: 1995 to 2012. Journal of Construction Engineering and Management, 142(11): 05016013, ISSN 0733-9364
Chang, C J and Yu, S W (2018) Three-variance approach for updating earned value management. Journal of Construction Engineering and Management, 144(6): 04018045, ISSN 0733-9364
Chang, C Y and Ko, J W (2017) New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks. Journal of Construction Engineering and Management, 143(1): 06016006, ISSN 0733-9364
Chang, C Y and Qian, Y (2015) An econometric analysis of holdup problems in construction projects. Journal of Construction Engineering and Management, 141(6): 04015004, ISSN 0733-9364
Chang, L M (1986) Inferential statistics for craftsman questionnaire. Journal of Construction Engineering and Management, 112(4), pp. 492-499. ISSN 0733-9364
Chang, L M and Borcherding, J D (1985) Evaluation of craftsman questionnaire. Journal of Construction Engineering and Management, 111(4), pp. 426-437. ISSN 0733-9364
Chang, L M and Borcherding, J D (1986) Craftsman questionnaire sampling. Journal of Construction Engineering and Management, 112(4), pp. 543-556. ISSN 0733-9364
Chang, L-M (1983) Evaluation and improvement of craftsman questionnaire in measuring construction productivity. PhD thesis, University of Texas at Austin, USA.
Chang, S; Castro-Lacouture, D and Yamagata, Y (2020) Estimating building electricity performance gaps with internet of things data using Bayesian multilevel additive modeling. Journal of Construction Engineering and Management, 146(12): 05020017, ISSN 0733-9364
Chang Albitres, C M (2007) Development of a multi-objective strategic management approach to improve decisions for pavement management practices in local agencies. PhD thesis, Texas A&M University, USA.
Chanyotha, S (1991) Generic cost estimates, site screening, and site design of low- and intermediate-level waste system. PhD thesis, University of Arizona, USA.
Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X
Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364
Chao, L C and Kuo, C P (2018) Neural-network-centered approach to determining lower limit of combined rate of overheads and markup. Journal of Construction Engineering and Management, 144(2): 04017117, ISSN 0733-9364
Chao, L C and Liaw, S J (2019) Fuzzy logic model for determining minimum overheads-cum-markup rate. Journal of Construction Engineering and Management, 145(4): 04019008, ISSN 0733-9364
Chao, L C and Liou, C N (2007) Risk-minimizing approach to bid-cutting limit determination. Construction Management and Economics, 25(8), pp. 835-843. ISSN 1466433X
Chao, L C and Skibniewski, M J (1995) Neural network method of estimating construction technology acceptability. Journal of Construction Engineering and Management, 121(1), pp. 130-142. ISSN 0733-9364
Chao, L C and Skibniewski, M J (1998) Fuzzy logic for evaluating alternative construction technology. Journal of Construction Engineering and Management, 124(4), pp. 297-304. ISSN 0733-9364
Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.
Chaphalkar, N and Iyer, K C (2014) Factors influencing decisions on delay claims in construction contracts for Indian scenario. Construction Economics and Building, 14(1), pp. 32-44. ISSN 2204-9029
Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts. PhD thesis, Indian Institute of Technology Delhi, India.
Charbel, G; Assaad, R H; Qiao, Y and Labi, S (2025) Predicting the level of competition and determining optimal bidding strategies for bundled projects: Integrating machine-learning algorithms and probabilistic modeling. Journal of Construction Engineering and Management, 151(11): 04025178, ISSN 0733-9364
Charles, S P R; Wanigarathna, N and Sherratt, F (2015) Construction project change: Investigating cost and benefits. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Charlesraj, V P C; Maheswari, J U; Kalidindi, S N and Varghese, K (2004) Knowledge management for planning construction projects using dependency structure matrix. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Charoenngam, C (1993) A knowledge-base representation for a construction measurement control information system (CMCIS). PhD thesis, University of Texas at Austin, USA.
Charoenngam, C and Sriprasert, E (2001) Assessment of cost control systems: A case study of Thai construction organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 368-380. ISSN 0969-9988
Chassiakos, A P and Sakellaropoulos, S P (2005) Time-cost optimization of construction projects with generalized activity constraints. Journal of Construction Engineering and Management, 131(10), pp. 1115-1124. ISSN 0733-9364
Chau, A D (2018) Conceptual cost estimation decision support system in university construction projects. PhD thesis, University of Alabama, USA.
Chau, A D; Hoang, H T and Nguyen, L D (2025) Web-based decision support system for automated pavement design and life-cycle cost analysis. Journal of Construction Engineering and Management, 151(8): 05025004, ISSN 0733-9364
Chau, K W (1993) Estimating industry-level productivity trends in the building industry from building cost and price data. Construction Management and Economics, 11(5), pp. 370-383. ISSN 01446193
Chau, K W (1995) Monte Carlo simulation of construction costs using subjective data. Construction Management and Economics, 13(5), pp. 369-383. ISSN 01446193
Chau, K W (1995) The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: Empirical evidence from Hong Kong. Construction Management and Economics, 13(1), pp. 15-21. ISSN 01446193
Chau, K W (1998) The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong. Engineering, Construction and Architectural Management, 5(1), pp. 38-50. ISSN 0969-9988
Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364
Chau, K W and Walker, A (1988) The measurement of total factor productivity of the Hong Kong construction industry. Construction Management and Economics, 6(3), pp. 209-224. ISSN 01446193
Chavan, A. P.; Ghosh, S. and McCuen, T. (2026) Use of virtual reality in construction education: USA educators' perspectives. International Journal of Building Pathology and Adaptation, 44(4), pp. 849-866. ISSN 2398-4708
Chavoshy, A; Amini Hosseini, K and Hosseini, M (2018) Resiliency cube: A new approach for parametric analysis of earthquake resiliency in urban road networks. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 317-332. ISSN 1759-5916
Che Haron, R (2017) Systems thinking paradigm in construction cost estimating reliability. PhD thesis, University of Reading, UK.
Cheetham, D W; Kaka, A P and Humphreys, G (1997) Development and implementation of a system of financial planning and control for a medium sized building contractor. Journal of Financial Management of Property and Construction, 2(1), pp. 5-34. ISSN 1366-4387
Chehayeb, N N (1996) Simulation-based project control. PhD thesis, University of Alberta, Canada.
Chehayeb, N N and AbouRizk, S M (1998) Simulation-based scheduling with continuous activity relationships. Journal of Construction Engineering and Management, 124(2), pp. 107-115. ISSN 0733-9364
Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988
Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988
Chen, S.; Guan, Z.; Zhang, Z.; Guo, H. and Han, Y. (2026) Impact of construction workers' physical fatigue on unsafe behavior: An ecg-based field experiment study. Journal of Construction Engineering and Management, 152(8): 04026128, ISSN 0733-9364
Chen, C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Chen, C (2015) A proactive approach for change management and control on construction projects. PhD thesis, University of California, Berkeley, USA.
Chen, C (2019) Heterogeneous integration of BIM with low-cost indoor mobile laser scanning method for building fabric maintenance in China. PhD thesis, University of Nottingham, UK.
Chen, C; Tang, L; Hancock, C M and Zhang, P (2019) Development of low-cost mobile laser scanning for 3D construction indoor mapping by using inertial measurement unit, ultra-wide band and 2D laser scanner. Engineering, Construction and Architectural Management, 26(7), pp. 1367-1386. ISSN 0969-9988
Chen, F-C (2021) Deep learning studies for vision-based condition assessment and attribute estimation of civil infrastructure systems. PhD thesis, Purdue University, USA.
Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364
Chen, H L (2009) Model for predicting financial performance of development and construction corporations. Journal of Construction Engineering and Management, 135(11), pp. 1190-1200. ISSN 0733-9364
Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364
Chen, H-L (2002) Development of a systematic integration approach for multi-level cost flow prediction and management. PhD thesis, University of Florida, USA.
Chen, J; Taylor, J E and Comu, S (2017) Assessing task mental workload in construction projects: A novel electroencephalography approach. Journal of Construction Engineering and Management, 143(8): 04017053, ISSN 0733-9364
Chen, J H; Hayati, D W; Su, Y M; Wijatmiko, I and Purnamasari, R (2019) Improving preliminary cost estimation in Indonesia using support vector regression. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 25-33. ISSN 17514304
Chen, J H; Su, M C and Huang, D Y (2010) Application of a SOM-based optimization algorithm in minimizing construction time for secant pile wall. Journal of Construction Engineering and Management, 136(11), pp. 1189-1195. ISSN 0733-9364
Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193
Chen, K W; Teitelbaum, E; Meggers, F; Pantelic, J and Rysanek, A (2021) Exploring membrane-assisted radiant cooling for designing comfortable naturally ventilated spaces in the tropics. Building Research & Information, 49(5), pp. 483-495. ISSN 0961-3218
Chen, Q; Jin, Z; Xia, B; Wu, P and Skitmore, M (2016) Time and cost performance of design-build projects. Journal of Construction Engineering and Management, 142(2): 04015074, ISSN 0733-9364
Chen, Q; Tian, Z; Lei, T and Huang, S (2023) An association rule mining model for evaluating the potential correlation of construction cross operation risk. Engineering, Construction and Architectural Management, 30(10), pp. 5109-5132. ISSN 0969-9988
Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.
Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains. PhD thesis, Stanford University, USA.
Chen, S; Tian, Y; Jin, L and Xiang, L (2021) Estimating the frequency of exposure to uncertain hazards: Impact of wind conditions on concrete dam construction. Journal of Construction Engineering and Management, 147(2): 04020167, ISSN 0733-9364
Chen, S; Zeng, N; Li, F; Yue, H; Wang, Q and Li, Q (2025) Proactive safety risk control system for deep foundation pit construction: Situational tailoring of integrated cybernetics and dual-system theory. Journal of Construction Engineering and Management, 151(4): 04025018, ISSN 0733-9364
Chen, W T and Huang, Y H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Construction Management and Economics, 24(12), pp. 1231-1239. ISSN 1466433X
Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.
Chen, Wenxin (2022) Establishing balance in project governance: Exploring yin-yang and mindfulness. PhD thesis, University of New South Wales, Australia.
Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technologies in the AEC sector: A comparative study of digital competence among industry practitioners. International Journal of Construction Management, 25(1), pp. 63-76. ISSN 1562-3599
Chen, X; Zhang, Y; Zhao, B and Yang, S (2021) Investment probabilistic interval estimation for construction project using the hybrid model of SVR and GWO. Journal of Construction Engineering and Management, 147(5): 04021031, ISSN 0733-9364
Chen, Xinyu (2025) Multimodal data fusion-based ergonomic assessment method for construction workers. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Chen, Y (2008) A highway work zone design and traffic management decision system. PhD thesis, University of Wisconsin - Madison, USA.
Chen, Y; Chen, S; Hu, C; Jin, L and Zheng, X (2020) Novel probabilistic cost estimation model integrating risk allocation and claim in hydropower project. Journal of Construction Engineering and Management, 146(8): 04020092, ISSN 0733-9364
Chen, Y; Fang, Q and Lan, Y (2025) Development of a modular assembling, suspended, and sliding scaffold. Journal of Construction Engineering and Management, 151(9): 04025131, ISSN 0733-9364
Chen, Y E; Ahiaga-Dagbui, D; Thaheem, M and Shrestha, A (2022) Optimism bias in transport project cost appraisal: A review of the current body of knowledge. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Chen, Yuxuan (2024) Investigation of faults in air-conditioning systems in commercial buildings: Occurrence, diagnostic validation, and energy impacts. PhD thesis, University of Nebraska - Lincoln, USA.
Chen, Z; Li, H; Shen, Q and Xu, W (2004) An empirical model for decision-making on ISO 14000 acceptance in the Shanghai construction industry. Construction Management and Economics, 22(1), pp. 55-73. ISSN 01446193
Cheng, M. Y.; Sholeh, M. N. and Poetra, B. A. (2026) Predicting the construction cost-time tradeoff using optimized hybrid deep learning for risk preference decision making. International Journal of Construction Management, 26(10), pp. 2018-2044. ISSN 1562-3599
Cheng, Y H and Hong, W T (2025) An analytical research tool for monitoring stakeholder conflicts in public-private partnership project delivery. Construction Management and Economics, 43(12), pp. 1060-1079. ISSN 0144-6193
Cheng, E W L; Li, H; Shen, L Y and Fong, P S W (2002) Ranking of construction information for various functions of the general contractors: A preliminary study. Journal of Construction Research, 3(1), pp. 181-191. ISSN 1609-9451
Cheng, G and Wilmot, C G (2009) Louisiana highway construction cost trend after hurricanes Katrina and Rita. Journal of Construction Engineering and Management, 135(7), pp. 594-600. ISSN 0733-9364
Cheng, L and Tiong, R L K (2005) Minimum feasible tariff model for BOT water supply projects in Malaysia. Construction Management and Economics, 23(3), pp. 255-263. ISSN 01446193
Cheng, M Y; Chang, Y H and Korir, D (2019) Novel approach to estimating schedule to completion in construction projects using sequence and nonsequence learning. Journal of Construction Engineering and Management, 145(11): 04019072, ISSN 0733-9364
Cheng, M Y and Yang, S C (2001) GIS-based cost estimates integrating with material layout planning. Journal of Construction Engineering and Management, 127(4), pp. 291-299. ISSN 0733-9364
Cheng, Y M; Yu, C H and Wang, H T (2011) Short-interval dynamic forecasting for actual S-curve in the construction phase. Journal of Construction Engineering and Management, 137(11), pp. 933-941. ISSN 0733-9364
Chenger, D T (2012) Executive level capital project decision making: Rational or rationale? PhD thesis, University of Calgary, Canada.
Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364
Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited. PhD thesis, Queensland University of Technology, Australia.
Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(4), pp. 391-405. ISSN 01446193
Cheung, F K T; Wong, M W L and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(4), pp. 349-362. ISSN 1466433X
Chi Man Hui, E; Omar, I and Ismail, M (2009) Kotaka's model in land acquisition for infrastructure provision in Malaysia. Journal of Financial Management of Property and Construction, 14(3), pp. 194-207. ISSN 1366-4387
Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X
Chih, Y-Y (2010) A decision-support framework for choosing a project delivery system in a multi-project environment. PhD thesis, University of California, Berkeley, USA.
Chih, Ying-Yi (2010) A decision-support framework for choosing a project delivery system (PDS) in a multi-project environment. PhD thesis, University of California, USA.
Chileshe, N; Reza Hosseini, M and Jepson, J (2016) Critical barriers to implementing risk assessment and management practices in the Iranian construction sector. Journal of Construction in Developing Countries, 21(2), pp. 81-112. ISSN 1823-6499
Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.
Cho, C; Kim, K; Park, J and Cho, Y K (2018) Data-driven monitoring system for preventing the collapse of scaffolding structures. Journal of Construction Engineering and Management, 144(8): 04018077, ISSN 0733-9364
Cho, M; Bugg, R; Sattineni, A and Redden, L (2021) Wood waste minimization practices in residential construction. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.
Cho, Y (2000) The Korean housebuilding industry: aspects of growth, efficiency and diversification, 1980-1995. PhD thesis, London School of Economics and Political Science, UK.
Cho, Y; Wang, C and Zhuang, Z (2013) Framework for empirical process to improve nonnuclear gauge performance in hot-mix asphalt pavement construction. Journal of Construction Engineering and Management, 139(6), pp. 601-610. ISSN 0733-9364
Choi, C Y; Ryu, K R and Shahandashti, M (2021) Predicting city-level construction cost index using linear forecasting models. Journal of Construction Engineering and Management, 147(2): 0001973, ISSN 0733-9364
Choi, H H; Cho, H N and Seo, J W (2004) Risk assessment methodology for underground construction projects. Journal of Construction Engineering and Management, 130(2), pp. 258-272. ISSN 0733-9364
Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.
Choi, J; Hong, D H; Lee, S H; Lee, H Y; Hong, T; Lee, D E and Park, H S (2023) Multi-objective green design model for prestressed concrete slabs in long-span buildings. Architectural Engineering and Design Management, 19(5), pp. 531-549. ISSN 1745-2007
Choi, K (2008) Applications of ITS archived data for improved highway planning and design. PhD thesis, University of Wisconsin - Madison, USA.
Choi, K; Kwak, Y H; Pyeon, J H and Son, K (2012) Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects. Journal of Construction Engineering and Management, 138(3), pp. 323-330. ISSN 0733-9364
Choi, K; Lee, H W; Mao, Z; Lavy, S and Ryoo, B Y (2016) Environmental, economic, and social implications of highway concrete rehabilitation alternatives. Journal of Construction Engineering and Management, 142(2): 04015079, ISSN 0733-9364
Choi, S; Kim, D Y; Han, S H and Kwak, Y H (2014) Conceptual cost-prediction model for public road planning via rough set theory and case-based reasoning. Journal of Construction Engineering and Management, 140(1): 04013026, ISSN 0733-9364
Choi, Seogjae (2024) Addressing material-related issues in industrial construction projects: The state of supplier involvement in project planning and the barriers to information sharing. PhD thesis, University of Texas at Austin, USA.
Choi, Y S; Lim, I; Kim, T; Cho, H and Kang, K I (2016) Case study of the core structure succeeding method for tall building construction. Journal of Construction Engineering and Management, 142(12): 05016017, ISSN 0733-9364
Chokwitthaya, C (2020) A framework for augmenting building performance models using machine learning and immersive virtual environment. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Chomicka, B A (2013) Drivers and cost implications of quality failures in commercial offices. PhD thesis, Glasgow Caledonian University, UK.
Chong, H Y; Zhang, Y; Lee, C Y; Wang, F and Zhang, Y (2025) Synchronizing BIM cost models and bills of quantities for lifecycle audit trail cost management. Engineering, Construction and Architectural Management, 32(10), pp. 6566-6592. ISSN 0969-9988
Chong, D; Wang, Y; Chen, L and Yu, B (2016) Modeling and validation of energy consumption in asphalt mixture production. Journal of Construction Engineering and Management, 142(12): 04016069, ISSN 0733-9364
Chong, D; Wang, Y; Zhao, K; Wang, D and Oeser, M (2018) Asphalt fume exposures by pavement construction workers: Current status and project cases. Journal of Construction Engineering and Management, 144(4): 05018002, ISSN 0733-9364
Chong, W K O (2005) Construction production rate information system for highway projects. PhD thesis, University of Texas at Austin, USA.
Chong, W-h B (2016) A process-data supported input-output framework for delineating the embodied emissions of Hong Kong construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Chotibhongs, R (2011) Managing the bidding process for the construction owner-detection and prevention of unbalanced bids and collusive bids. PhD thesis, Illinois Institute of Technology, USA.
Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.
Choudhry, R M; Aslam, M A and Arain, F M (2014) Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7): 04014020, ISSN 0733-9364
Chovichien, V (1981) The discounted cost model and application to acquisition and utilization policies of construction equipment. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Chow, D H C (2005) Effects of future climate change and near-extreme weather on office building in the UK. PhD thesis, University of Manchester, UK.
Chowdhury, A A (1994) An object-oriented finite element formulation for construction simulation. PhD thesis, Lehigh University, USA.
Choy, L H T; Ho, W K O and Mak, S W K (2012) Housing attributes and Hong Kong real estate prices: A quantile regression analysis. Construction Management and Economics, 30(5), pp. 359-366. ISSN 01446193
Christian, J (2002) An overview of systems utilizing information and communication technologies: Five research case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Christian, J and Hachey, D (1995) Effects of delay times on production rates in construction. Journal of Construction Engineering and Management, 121(1), pp. 20-26. ISSN 0733-9364
Christodoulou, S E (1998) Optimum bid markup calculation in competitive bidding environments using fuzzy artificial neural networks. PhD thesis, Columbia University, USA.
Christofferson, J P (1996) Computer-integrated specification information flow through the residential construction process. PhD thesis, Colorado State University, USA.
Chritamara, S; Ogunlana, S O and Bach, N L (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2(4), pp. 269-295. ISSN 1471-4175
Chua, D K H; Kog, Y C; Loh, P K and Jaselskis, E J (1997) Model for construction budget performance: neural network approach. Journal of Construction Engineering and Management, 123(3), pp. 214-222. ISSN 0733-9364
Chua, D K H and Li, D (2000) Key factors in bid reasoning model. Journal of Construction Engineering and Management, 126(5), pp. 349-357. ISSN 0733-9364
Chua, S J L; Zubbir, N B; Ali, A S and Au-Yong, C P (2018) Maintenance of high-rise residential buildings. International Journal of Building Pathology and Adaptation, 36(2), pp. 137-151. ISSN 23984708
Chua Ying Kit, J (1996) The human-machine interface (HMI) and re-bar detection aspects of a non-destructive testing (NDT) robot. PhD thesis, City, University of London, UK.
Chui, K W (2010) Comparison of construction labor productivity between U.S. and China: Using on-site productivity measurement methods. PhD thesis, University of Kansas, USA.
Chun, S and Nam, K (2022) Analyzation and prioritization of healthcare environment criteria for designing geriatric long-term care private hospitals in South Korea using an analytic hierarchy process. Architectural Engineering and Design Management, 18(5), pp. 723-738. ISSN 1745-2007
Chung, Demi (2012) Contractual approach to optimising risk sharing: A quantitative study of the multidimensional nature of risk in private provision of road infrastructure. PhD thesis, University of Sydney, Australia.
Chung, J Y (1984) Comparison of safety programs and employee attitudes within university of California facilities management departments. PhD thesis, University of California, Santa Barbara, USA.
Chung, K-H J (2010) Development of a collaborative briefing approach for infrastructure projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Chung, T H (2007) Simulation-based productivity modeling for tunnel construction operations. PhD thesis, University of Alberta, Canada.
Chung, T H; Mohamed, Y and Abourizk, S (2006) Bayesian updating application into simulation in the North Edmonton sanitary trunk tunnel project. Journal of Construction Engineering and Management, 132(8), pp. 882-894. ISSN 0733-9364
Cirelli Jr., L R (2017) Impact of design fees and duration of design process on construction quality: Implications for quality management. PhD thesis, Baker College (Michigan), USA.
Cirilovic, J; Vajdic, N; Mladenovic, G and Queiroz, C (2014) Developing cost estimation models for road rehabilitation and reconstruction: Case study of projects in Europe and Central Asia. Journal of Construction Engineering and Management, 140(3): 4013065, ISSN 0733-9364
Cirrincione, Laura (2021) Simulation and experimental methods for improving energy efficiency, environmental performance and resilience of single and clustered groups of buildings. PhD thesis, Università degli Studi di Palermo, Italy.
Cochran, K M (2006) Construction and demolition debris recycling: Methods, markets, and policy. PhD thesis, University of Florida, USA.
Cockerill, J E (1993) The construction industry in belfast 1800-1914. PhD thesis, Queen's University Belfast, UK.
Coffelt Jr., D P (2008) Roof management improvement: Improving infrastructure management decision making through a consideration of total life cycle cost and deterioration. PhD thesis, Carnegie Mellon University, USA.
Coffie, G H (2018) Development of a cost-predicting model for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.
Cole, R; Simpson, C H; Ferguson, L; Symonds, P; Taylor, J; Heaviside, C; Murage, P; Macintyre, H L; Hajat, S; Mavrogianni, A and Davies, M (2024) A population-level framework to estimate unequal exposure to indoor heat and air pollution. Buildings & Cities, 5(1), pp. 562-580. ISSN 2632-6655
Cole, R J and Sterner, E (2000) Reconciling theory and practice of life-cycle costing. Building Research & Information, 28(5-6), pp. 368-375. ISSN 0961-3218
Colley, J G (2011) An exploration of competitive advantage in the plasterboard industry. PhD thesis, University of Nottingham, UK.
Collins, A; Blondel, A A; Mensah, S and Manu, E (2021) Assessing the cost of competitive tendering in Ghana using transaction cost theory. Built Environment Project and Asset Management, 11(5), pp. 835-850. ISSN 2044-124X
Collins, F (2013) 2nd generation concrete construction: Carbon footprint accounting. Engineering, Construction and Architectural Management, 20(4), pp. 330-344. ISSN 0969-9988
Collins, W and Redden, L (2021) Improving student’s estimating abilities through experiential learning. International Journal of Construction Education and Research, 17(2), pp. 117-132. ISSN 1557-8771
Commuri, S; Mai, A T and Zaman, M (2011) Neural network-based intelligent compaction analyzer for estimating compaction quality of hot asphalt mixes. Journal of Construction Engineering and Management, 137(9), pp. 634-644. ISSN 0733-9364
Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.
Conejos, S; Ubando, A and Lin Chew, M Y (2022) Design for maintainability tool for nano-façade coating applications on high-rise façades in the tropics. Built Environment Project and Asset Management, 12(1), pp. 70-95. ISSN 2044-124X
Congress, S S C (2018) Novel infrastructure monitoring using multifaceted unmanned aerial vehicle systems: close range photogrammetry (UAV-CRP) data analysis. PhD thesis, University of Texas at Arlington, USA.
Cooper, Arthur Ashley (1971) An economic study of housing production and associated works in Australia. PhD thesis, University of New South Wales, Australia.
Cooper, J; Lee, A and Jones, K (2020) Sustainable built asset management performance indicators and attributes: A UK social housing case study example. International Journal of Building Pathology and Adaptation, 38(3), pp. 508-522. ISSN 23984708
Coopman, J T (1998) Superintendent motivation and satisfaction related to the use of construction management for school facility projects. EdD thesis, Ball State University, USA.
Corbett, D I (1997) Quantifying quality in industrial construction. PhD thesis, Pennsylvania State University, USA.
Corbett, P and Rowley, P (1999) The use of bcis elemental cost data by quantity surveyors as part of cost planning techniques: The practitioners' perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance. PhD thesis, University of Alberta, Canada.
Cosma, C (2003) Development of a systematic approach for uncertainty assessment in scheduling multiple repetitive construction processes by using fuzzy set theory. PhD thesis, University of Florida, USA.
Cote, B; Robinson, B; Gabr, M A and Borden, R H (2013) Performance-cost analysis of stabilized undercut subgrades. Journal of Construction Engineering and Management, 139(2), pp. 121-127. ISSN 0733-9364
Cothern, E J (2021) Exposure to respirable crystalline silica during five OSHA Table 1 tasks and the effectiveness of dust controls, the contribution of background silica dust to personal exposures, and the use of a photometric instrument to assess silica dust exposure in real time. PhD thesis, Colorado State University, USA.
Cottrell, W D (1999) Simplified program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 125(1), pp. 16-22. ISSN 0733-9364
Cowie, G F (1987) Enough scope yields better estimates. Journal of Construction Engineering and Management, 113(2), pp. 315-320. ISSN 0733-9364
Crandell, D (2018) Enhancing traditional earned value management with three-point estimates to produce probability based performance forecasts and contingency funding projections for engineering-construction projects. DEngr thesis, George Washington University, USA.
Crawford, R H; Treloar, G J; Ilozor, B D and Love, P E D (2003) Comparative greenhouse emissions analysis of domestic solar hot water systems. Building Research & Information, 31(1), pp. 34-47. ISSN 0961-3218
Crawley, J; Domoney, L; O'Donovan, A; Wingfield, J; Dinu, C; Kinnane, O and O'Sullivan, P (2026) Towards a universal framework for heat pump monitoring at scale. Buildings & Cities, 7(1), pp. 75-91. ISSN 2632-6655
Crawley, J; Biddulph, P; Wingfield, J; Ashdown, M; Lowe, R and Elwell, C (2020) Inferring the as-built air permeability of new UK dwellings. International Journal of Building Pathology and Adaptation, 38(1), pp. 3-19. ISSN 23984708
Crawley, J; McKenna, E; Gori, V and Oreszczyn, T (2020) Creating domestic building thermal performance ratings using smart meter data. Buildings & Cities, 1(1), pp. 1-13. ISSN 2632-6655
Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.
Creedy, G D; Skitmore, M and Wong, J K W (2010) Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. Journal of Construction Engineering and Management, 136(5), pp. 528-537. ISSN 0733-9364
Crespo Vallejo, L G (2018) Project manager strategies to improve the delivery of construction projects. PhD thesis, Walden University, USA.
Crippa, J; Boeing, L C; Caparelli, A P A; da Costa, M R M M; Scheer, S; Araujo, A M F and Bem, D (2018) A BIM–LCA integration technique to embodied carbon estimation applied on wall systems in Brazil. Built Environment Project and Asset Management, 8(5), pp. 491-503. ISSN 2044-124X
Cristaudo, Rossana (2018) Essays on cost overruns in infrastructure provision. PhD thesis, Università degli Studi di Messina, Italy.
Crolla, Kristof (2018) Building simplexity: The 'more or less' of post-digital architecture practice. PhD thesis, RMIT University, Australia.
Crowley, L G (1997) Robust statistical estimators for use within competitive bid data. Journal of Construction Engineering and Management, 123(1), pp. 53-63. ISSN 0733-9364
Crowley, L G (2000) Friedman and gates: another look. Journal of Construction Engineering and Management, 126(4), pp. 306-312. ISSN 0733-9364
Cruz Rios, F (2018) Beyond recycling: Design for disassembly, reuse, and circular economy in the built environment. PhD thesis, Arizona State University, USA.
Cruz-Roveda, S (2022) A qualitative open-ended interview study using a comparative multiple case study approach of bus rapid transit (BRT) construction projects within the United States. DPA thesis, California Baptist University, USA.
Cuciniello, G; Inzerillo, G; Corazziari, L; Ciampini, A; Degni, R; Torresi, M and Leandri, P (2023) Modeling the tire-pavement noise as a regression function of speed, mixture properties, and age of the layer. Journal of Construction Engineering and Management, 149(9): 04023080, ISSN 0733-9364
Cui, L Z; Liu, J; Luo, H; Wang, J; Zhang, X; Lv, G and Xie, Q (2024) Deformation measurement of tunnel shotcrete liner using the multiepoch lidar point clouds. Journal of Construction Engineering and Management, 150(6): 04024049, ISSN 0733-9364
D'Amato, M and Kauko, T (2012) Sustainability and risk premium estimation in property valuation and assessment of worth. Building Research & Information, 40(2), pp. 174-185. ISSN 0961-3218
Dabbas, M A A (1981) Computerized decision making in construction. PhD thesis, Georgia Institute of Technology, USA.
Dabirian, S; Abbaspour, S; Khanzadi, M and Ahmadi, M (2022) Dynamic modelling of human resource allocation in construction projects. International Journal of Construction Management, 22(2), pp. 182-191. ISSN 1562-3599
Dabirian, S; Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(3), pp. 1201-1221. ISSN 0969-9988
Dada, J O and Jagboro, G O (2007) An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(1), pp. 37-44. ISSN 1366-4387
Dada, J O and Jagboro, G O (2012) Core skills requirement and competencies expected of quantity surveyors: Perspectives from quantity surveyors, allied professionals and clients in Nigeria. Construction Economics and Building, 12(4), pp. 78-90. ISSN 2204-9029
Dada, M O (2014) The influence of project team relationships on cost growth. Journal of Financial Management of Property and Construction, 19(1), pp. 76-94. ISSN 1366-4387
Dadzie, J; Runeson, G and Ding, G (2020) Assessing determinants of sustainable upgrade of existing buildings: The case of sustainable technologies for energy efficiency. Journal of Engineering, Design and Technology, 18(1), pp. 270-292. ISSN 1726-0531
Dadzie, John (2018) A model for predicting the energy performance of existing buildings upgraded with sustainable technologies. PhD thesis, University of Technology Sydney, Australia.
Dafeamekpor, C A; Adjei-Kumi, T; Nani, G; Kissi, E and Tengan, C (2023) Determinants for assessing self-help housing affordability in Ghana's housing sector: A Delphi approach. International Journal of Construction Management, 23(11), pp. 1815-1827. ISSN 1562-3599
Daghsen, K.; Gonzalez-Moreno, S. and Picallo-Perez, A. (2026) Energy rehabilitation of a university building system as a technical response to the Spanish blackout. Building Research & Information, 54(6), pp. 733-752. ISSN 0961-3218
Dahanayake, B; Ramachandra, T and Thurairajah, N (2016) Assessment on rework costs probability of housing projects in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Damdelen, O and Tansu, A (2022) Influence of recycled plastic on the thermal transmittance and sustainable assessment of concrete mixes. Journal of Construction Engineering and Management, 148(12): 04022135, ISSN 0733-9364
Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.
Dandago, A A; Yamusa, M A; Lawal, H S; Abubakar, M; Abdullahi, M and Zailani, B M (2025) Impact of uncertainty factors on the performance of building renovation projects. Journal of Engineering, Design and Technology, 23(6), pp. 1875-1897. ISSN 1726-0531
Dandan, T H; Sweis, G; Sukkari, L S and Sweis, R J (2020) Factors affecting the accuracy of cost estimate during various design stages. Journal of Engineering, Design and Technology, 18(4), pp. 787-819. ISSN 1726-0531
Dang, C N and Le-Hoai, L (2018) Revisiting storey enclosure method for early estimation of structural building construction cost. Engineering, Construction and Architectural Management, 25(7), pp. 877-895. ISSN 0969-9988
Dang-Trinh, N; Duc-Thang, P; Nguyen-Ngoc Cuong, T and Duc-Hoc, T (2023) Machine learning models for estimating preliminary factory construction cost: Case study in southern Vietnam. International Journal of Construction Management, 23(16), pp. 2879-2887. ISSN 1562-3599
Daoud, A O; KhairEldin, M; Ibrahim, A H and Toma, H M (2026) Adaptive neuro-fuzzy inference system for Egyptian residential construction waste prediction. International Journal of Construction Management, 26(6), pp. 1059-1077. ISSN 1562-3599
Daoud, A. O.; Lal, R.; Gouda Mohamed, A.; Mohamed, M. and Wefki, H. (2026) An implementation framework for blockchain and smart contracts adoption in the egyptian construction sector. International Journal of Construction Management, 26(9), pp. 1707-1726. ISSN 1562-3599
Daoud, O E K (1997) The architect/engineer's role in rehabilitation work. Journal of Construction Engineering and Management, 123(1), pp. 1-5. ISSN 0733-9364
Das, P P; Khatri, V N; Doley, R; Dutta, R K and Yadav, J S (2024) Estimation of bearing capacity of shallow footings on layered sand using finite elements analysis. Journal of Engineering, Design and Technology, 22(2), pp. 385-403. ISSN 1726-0531
Das, R and Nakano, M (2023) A multi-criteria decision-making model using socio-technical attributes for transportation bridge maintenance prioritisation. International Journal of Construction Management, 23(4), pp. 579-585. ISSN 1562-3599
Datta, S D; Sobuz, M H R; Nafe Assafi, M; Sutan, N M; Islam, M N; Mannan, M B; Akid, A S M and Hasan, N M S (2025) Critical project management success factors analysis for the construction industry of Bangladesh. International Journal of Building Pathology and Adaptation, 43(3), pp. 482-511. ISSN 2398-4708
Dauber, V F (2003) Measuring and minimising waste in construction by applying lean thinking. PhD thesis, University of Dundee, UK.
Dave, N; Guduru, R; Misra, A K and Sharma, A K (2022) Experimental evaluation of bond behavior in controlled, binary and quaternary concretes developed using scms. Journal of Engineering, Design and Technology, 20(6), pp. 1430-1448. ISSN 1726-0531
Davenport, D M (1997) Client satisfaction with construction cost: A comparative study of French and UK performance. Journal of Financial Management of Property and Construction, 2(3), pp. 77-94. ISSN 1366-4387
David, D D (2007) Numerical platform to validate resistivity testing for NDE of civil engineering structures. PhD thesis, Wayne State University, USA.
Davies, A J (1995) Towards a method of measurement and cost control for civil engineering work in the petrochemical industry. PhD thesis, University of Northumbria at Newcastle, UK.
Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.
Davis, K; Ledbetter, W B and Burati, J L (1989) Measuring design and construction quality costs. Journal of Construction Engineering and Management, 115(3), pp. 385-400. ISSN 0733-9364
Davis, K A (2004) Information technology change in the architecture, engineering, and construction industry: An investigation of individuals' resistance. PhD thesis, Virginia Tech, USA.
Davtalab, O (2018) A data driven software platform for process automation, planning and inspection of contour crafting large-scale robotic 3D printing system. PhD thesis, University of Southern California, USA.
Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193
Dawood, N N (1995) An integrated bidding management expert system for the make-to-order precast industry. Construction Management and Economics, 13(2), pp. 115-125. ISSN 01446193
Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Dawood, N N (2000) Forecasting of cost indices in the Greek construction industry: A joint methodology approach. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Dawood, N N (2001) Development of a forecasting methodology for cost indices: An application to the Greek construction industry. Journal of Construction Procurement, 7(1), pp. 42-50. ISSN 1358-9180
Dawood, N N and Bates, W (2000) A decision support system specification for out-turn cost and cost escalation in the heavy engineering industry. Engineering, Construction and Architectural Management, 7(4), pp. 330-346. ISSN 0969-9988
Dawood, N N and Dalakleidis, G D A (2002) Industrial review and development of a cost management system for the Greek construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Dawood, N N; Yasuhara, T; Usuda, Y; Matsuda, C and Sawada, A (2001) Analysis of cost escalation and risk assessment of infrastructure projects: An application in Japanese civil engineering projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Dağkıran, G (2015) A multi agent risk analysis and sharing platform for international construction projects. PhD thesis, Middle East Technical University, Turkey.
De Biasio, A and Murray, A (2017) The social network of the UK PPP secondary equity market: Returns and competition in an emerging market. Construction Management and Economics, 35(8-9), pp. 468-481. ISSN 0144-6193
De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364
De Marco, A; Briccarello, D and Rafele, C (2009) Cost and schedule monitoring of industrial building projects: Case study. Journal of Construction Engineering and Management, 135(9), pp. 853-862. ISSN 0733-9364
De Marco, A; Narbaev, T; Ottaviani, F M and Vanhoucke, M (2024) Influence of cost contingency management on project estimates at completion. International Journal of Construction Management, 24(9), pp. 935-945. ISSN 1562-3599
De Marco, A; Rafele, C and Thaheem, M J (2016) Dynamic management of risk contingency in complex design-build projects. Journal of Construction Engineering and Management, 142(2): 04015080, ISSN 0733-9364
De Oliveira, A L and Prudêncio, L R (2015) Evaluation of the superficial texture of concrete pavers using digital image processing. Journal of Construction Engineering and Management, 141(10): 04015034, ISSN 0733-9364
De Ridder, H A J (1994) Design and construct of complex civil engineering systems: A new approach to organization and contracts. PhD thesis, Delft University of Technology, Netherlands.
De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
De Saram, D D and Tang, S L (2005) Pain and suffering costs of persons in construction accidents: Hong Kong experience. Construction Management and Economics, 23(6), pp. 645-658. ISSN 01446193
De Venny, A S (1999) Recycling of demolished masonry rubble. PhD thesis, Edinburgh Napier University, UK.
Debella, F M (2020) Profitability improvement of construction firms through continuous improvement using rapid improvement principles and best practices. PhD thesis, Purdue University, USA.
Debrah, C and Owusu-Manu, D G (2022) An apposite framework for green cities development in developing countries: The case of Ghana. Construction Innovation, 22(4), pp. 789-808. ISSN 1471-4175
Decarolis, F (2009) When the highest bidder loses the auction: Theory and evidence from public procurement. PhD thesis, University of Chicago, USA.
Deddis, W G; McCluskey, W J; Mamis, A and McBumey, R D (1997) The potential for market research, property market analysis, & property valuation using (GIS) geographic information system technology. Journal of Financial Management of Property and Construction, 2(3), pp. 45-62. ISSN 1366-4387
Deep, S; Bhoola, V; Vidhani, J and Hampannaver, P R (2022) Evaluating the impact of constraints on project success: Empirical study of highway projects. Built Environment Project and Asset Management, 12(4), pp. 684-700. ISSN 2044-124X
Deepa, G; Niranjana, A J and Balu, A S (2025) A hybrid machine learning approach for early cost estimation of pile foundations. Journal of Engineering, Design and Technology, 23(1), pp. 306-322. ISSN 1726-0531
Delaney, F T and Wamuziri, S C (2001) Mergers and acquisitions in the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.
Delatte, N J (2017) Challenges of civil engineering megaprojects in North America. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 161-166. ISSN 17514304
Delgado, J M D; Oyedele, L; Bilal, M; Ajayi, A; Akanbi, L and Akinade, O (2020) Big data analytics system for costing power transmission projects. Journal of Construction Engineering and Management, 146(1): 05019017, ISSN 0733-9364
Delgado-Arvelo, Y (2012) An investigation into the data collection process for the development of cost models. PhD thesis, De Montfort University, UK.
Dell'Anna, F; Bottero, M; Becchio, C; Corgnati, S P and Mondini, G (2020) Designing a decision support system to evaluate the environmental and extra-economic performances of a nearly zero-energy building. Smart and Sustainable Built Environment, 9(4), pp. 413-442. ISSN 2046-6099
Deltas, G M (1996) Essays in auctions and procurement: An analysis of bidding rings, left bids, stochastic properties of winning bids, and two step structural estimators of bidding for contracts. PhD thesis, Yale University, USA.
Delwar, M (1998) A generic LCCA algorithm for pavement management decisions. PhD thesis, Washington State University, USA.
Demetracopoulou, Vassiliki A (2023) Risk and innovation in project delivery method selection for complex highway projects. PhD thesis, University of Texas at Austin, USA.
Demirel, H Ç; Leendertse, W; Volker, L and Hertogh, M (2017) Flexibility in PPP contracts: Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), pp. 196-206. ISSN 0144-6193
Demirkesen, S. (2025) Exploring the causes of sunk cost fallacy in the construction industry: Case of mega projects. Engineering, Construction and Architectural Management, 33(5), pp. 3761-3776. ISSN 0969-9988
Deng, B; Lv, X; Du, Y; Li, X and Yin, Y (2025) Critical risk factors for construction supply chain in China: A fuzzy synthetic evaluation analysis. Engineering, Construction and Architectural Management, 32(1), pp. 483-506. ISSN 0969-9988
Deng, T; Sharafat, A; Lee, S and Seo, J (2024) Automatic vision-based dump truck productivity measurement based on deep-learning illumination enhancement for low-visibility harsh construction environment. Journal of Construction Engineering and Management, 150(11): 04024154, ISSN 0733-9364
Densley Tingley, D (2013) Design for deconstruction: an appraisal. PhD thesis, University of Sheffield, UK.
Dent, S and Smallwood, J J (2014) Building economics pre-course student perceptions. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Devine, R D; Barbachyn, S M; Thrall, A P and Kurama, Y C (2018) Effect of tripping prefabricated rebar assemblies on bar spacing. Journal of Construction Engineering and Management, 144(11): 04018099, ISSN 0733-9364
Dhakal, S; Mrawira, D and Rankin, J (2009) Effect of specifications type on the quality of paving contracts in New Brunswick. Journal of Construction Engineering and Management, 135(9), pp. 801-811. ISSN 0733-9364
Dharmapalan, Vineeth (2021) Supply chain visibility for industrial construction projects: Assessment of benefits, current status, definitions, barriers, and enablers. PhD thesis, University of Texas at Austin, USA.
Di Maddaloni, F (2018) Stakeholder inclusiveness in megaprojects: Managing the locals for sustainable developments. PhD thesis, Kingston University, UK.
Diab, M F (2011) Analyses of highway project construction risks, performance, and contingency. PhD thesis, North Dakota State University, USA.
Diab, M F; Varma, A and Panthi, K (2017) Modeling the construction risk ratings to estimate the contingency in highway projects. Journal of Construction Engineering and Management, 143(8): 04017041, ISSN 0733-9364
Dias, J L; Silva, A; Chai, C; Gaspar, P L and De Brito, J (2014) Neural networks applied to service life prediction of exterior painted surfaces. Building Research & Information, 42(3), pp. 371-380. ISSN 0961-3218
Dick, B M (2019) Diagnostic testing in the natural and built environment. PhD thesis, North Carolina State University, USA.
Diekmann, J E (1983) Probabilistic estimating: Mathematics and applications. Journal of Construction Engineering and Management, 109(3), pp. 297-308. ISSN 0733-9364
Diekmann, J E and Featherman, W D (1998) Assessing cost uncertainty: Lessons from environmental restoration projects. Journal of Construction Engineering and Management, 124(6), pp. 445-451. ISSN 0733-9364
Dikmen, I; Birgonul, M T and Arikan, A E (2004) A critical review of risk management support tools. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Dikmen, I; Birgonul, M T and Arikan, A E (2006) Application of an integrated risk management system (IRMS) to an international construction project. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Dikmen, I; Birgonul, M T; Ozorhon, B and Sapci, N E (2010) Using analytic network process to assess business failure risks of construction firms. Engineering, Construction and Architectural Management, 17(4), pp. 369-386. ISSN 0969-9988
Dikmen, I; Birgonul, M T; Tah, J H M and Ozer, A H (2012) Web-based risk assessment tool using integrated duration-cost influence network model. Journal of Construction Engineering and Management, 138(9), pp. 1023-1034. ISSN 0733-9364
Dinh, T H; Dinh, T H and Götze, U (2024) Roadworks design: Study on selection of construction materials in the preliminary design phase based on economic performance. International Journal of Construction Management, 24(5), pp. 503-511. ISSN 1562-3599
Disney, O and Fahlstedt, O (2021) Site overheads: The lost dimension of improved productivity? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(3), pp. 287-298. ISSN 0969-9988
Dixit, M K (2017) Embodied energy and cost of building materials: Correlation analysis. Building Research & Information, 45(5), pp. 508-523. ISSN 0961-3218
Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599
Diyagama, D; Victar, H C; Waidyasekara, A S and Rameezdeen, R (2024) Managing external stakeholders influences in mega construction projects. International Journal of Construction Management, 24(8), pp. 809-819. ISSN 1562-3599
Dlakwa, M M (1990) Analysis of some problems in the management and cost control of public sector construction projects in Nigeria. PhD thesis, University of Stirling, UK.
Dmaidi, N (1995) Simplified estimating and control procedures for the offshore oil construction industry. PhD thesis, University of Dundee, UK.
Do, Q; Moriyani, M A; Le, C and Le, T (2023) Cost-weighted tf-idf: A novel approach for measuring highway project similarity based on pay items' cost composition and term frequency. Journal of Construction Engineering and Management, 149(8): 04023069, ISSN 0733-9364
Do, Q; Moriyani, M A; Le, T; Le, C and Piratla, K (2025) Enhanced highway project clustering framework to support project cost estimation. Journal of Construction Engineering and Management, 151(1): 04024191, ISSN 0733-9364
Do, Q; Le, T; Trinh, M T and Le, C (2025) Multiobjective project clustering optimization for enhancing highway contract bundling decisions. Journal of Construction Engineering and Management, 151(11): 04025166, ISSN 0733-9364
Doan, D T and Chinda, T (2016) Modeling construction and demolition waste recycling program in Bangkok: Benefit and cost analysis. Journal of Construction Engineering and Management, 142(12): 05016015, ISSN 0733-9364
Doan, P and Menyah, K (2013) Impact of irreversibility and uncertainty on the timing of infrastructure projects. Journal of Construction Engineering and Management, 139(3), pp. 331-338. ISSN 0733-9364
Doğan, S Z (2005) Using machine learning techniques for early cost prediction of structural systems of buildings. PhD thesis, Izmir Institute of Technology, Turkey.
Dolla, T; Devkar, G and Boeing, L (2021) Procurement governance and information asymmetry in waste management of India. Built Environment Project and Asset Management, 11(1), pp. 38-51. ISSN 2044-124X
Dolla, T and Laishram, B (2022) Strategies to promote collaborative governance regime in Indian rural road maintenance. Built Environment Project and Asset Management, 12(3), pp. 365-381. ISSN 2044-124X
Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(8), pp. 841-854. ISSN 01446193
Doloi, H (2009) Relational partnerships: The importance of communication, trust and confidence and joint risk management in achieving project success. Construction Management and Economics, 27(11), pp. 1099-1109. ISSN 1466433X
Doloi, H (2013) Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3), pp. 267-279. ISSN 0733-9364
Dong, F (2010) Essays in advanced risk management and quantitative strategies in infrastructure finance. PhD thesis, Columbia University, USA.
Dong, H (2024) Impact of sensing and occupancy parameters to achieve comfort and demand side management in buildings. PhD thesis, Michigan State University, USA.
Dong, N (2012) Automated look-ahead schedule generation and optimization for the finishing phase of complex construction projects. PhD thesis, Stanford University, USA.
Donyavi, S (2013) Understanding the complexity of materials procurement and the role of technology for small and medium sized enterprises in the construction sector. PhD thesis, University of Reading, UK.
Donyavi, S and Flanagan, R (2009) The impact of effective material management on construction site performance for small and medium sized construction enterprises. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Donyavi, S; Flanagan, R; Assadi-Langroudi, A and Parisi, L (2024) Understanding the complexity of materials procurement in construction projects to build a conceptual framework influencing supply chain management of msmes. International Journal of Construction Management, 24(2), pp. 177-186. ISSN 1562-3599
Dorr, E E (1979) Economies of scale in high school construction and operation. PhD thesis, North Carolina State University, USA.
Dosumu, B A (2022) Development of a construction project risk management framework: A case study of major Nigerian cities. PhD thesis, University of Manchester, UK.
Dosumu, O (2018) Assessment of the likelihood of risk occurrence on tendering and procurement of construction projects. Journal of Construction Business and Management, 2(1), pp. 20-32. ISSN 2521-0165
Dosumu, O S (2018) Perceived effects of prevalent errors in contract documents on construction projects. Construction Economics and Building, 18(1), pp. 1-26. ISSN 2204-9029
Dowsett, R and Harty, C (2015) Moving from static to dynamic measures of BIM success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Doyle, A and Hughes, W P (2000) The influence of project complexity on estimating accuracy. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Doǧan, S Z; Arditi, D and Murat Günaydin, H (2006) Determining attribute weights in a CBR model for early cost prediction of structural systems. Journal of Construction Engineering and Management, 132(10), pp. 1092-1098. ISSN 0733-9364
Doǧan, S Z; Arditi, D and Murat Günaydin, H (2008) Using decision trees for determining attribute weights in a case-based model of early cost prediction. Journal of Construction Engineering and Management, 134(2), pp. 146-152. ISSN 0733-9364
Draleti, G; Sengonzi, R and Kakitahi, J (2024) Improvement of risk management in cost estimation in the building construction industry in Uganda. Journal of Construction in Developing Countries, 29(1), pp. 111-138. ISSN 1823-6499
Drew D.S, T S L Y (2002) Developing a tendering strategy in two-envelope fee tendering based on technical score-fee variability. Construction Management and Economics, 20(1), pp. 67-81. ISSN 01446193
Drummond, P and Ekins, P (2016) Reducing CO2 emissions from residential energy use. Building Research & Information, 44(5-6), pp. 585-603. ISSN 0961-3218
Drury, P; Watson, S and Lomas, K J (2021) Summertime overheating in UK homes: Is there a safe haven? Buildings & Cities, 2(1), pp. 970-990. ISSN 2632-6655
Du, J (2012) Investigation of interpersonal cooperation in construction project teams: An agent-based modeling approach. PhD thesis, Michigan State University, USA.
Du, J; Kim, B C and Zhao, D (2016) Cost performance as a stochastic process: EAC projection by Markov chain simulation. Journal of Construction Engineering and Management, 142(6): 04016009, ISSN 0733-9364
Du, J; Wang, Q and Shi, Q (2019) Description-experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects. Engineering, Construction and Architectural Management, 26(6), pp. 1151-1170. ISSN 0969-9988
Du, J; Zhao, D and Zhang, O (2019) Impacts of human communication network topology on group optimism bias in capital project planning: A human-subject experiment. Construction Management and Economics, 37(1), pp. 44-60. ISSN 01446193
DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.
Duff, A R; Emsley, M; Gregory, M; Lowe, D and Masterman, J (1998) Development of a model of total building procurement costs for construction clients. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Duggan, G P; Bauleo, P; Authier, M; Aloise-Young, P A; Care, J and Zimmerle, D (2023) Electricity consumption in commercial buildings during COVID-19. Buildings & Cities, 4(1), pp. 851-866. ISSN 2632-6655
Duksh, Y S; Kaushik, B K; Sarkar, S and Singh, R (2013) Analysis of propagation delay and power with variation in driver size and number of shells in multi walled carbon nanotube interconnects. Journal of Engineering, Design and Technology, 11(1), pp. 19-33. ISSN 1726-0531
Duncan, K; Case, A and Manzo IV, F (2024) Prevailing wages, school construction costs, and bids by out-of-state contractors: evidence from the Minneapolis–Saint Paul metropolitan area. Construction Management and Economics, 42(8), pp. 695-713. ISSN 01446193
Duncan, K; Philips, P and Prus, M (2009) The effects of prevailing wage regulations on construction efficiency in British columbia. International Journal of Construction Education and Research, 5(2), pp. 63-78. ISSN 1557-8771
Duncan, K; Philips, P and Prus, M (2012) Using stochastic frontier regression to estimate the construction cost inefficiency of prevailing wage laws. Engineering, Construction and Architectural Management, 19(3), pp. 320-334. ISSN 0969-9988
Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.
Dunston, P S; Gambatese, J A and McManus, J F (2005) Assessing state transportation agency constructability implementation. Journal of Construction Engineering and Management, 131(5), pp. 569-578. ISSN 0733-9364
Dunston, P S; Sinfield, J V and Lee, T Y (2007) Technology development decision economics for real-time rolling resistance monitoring of haul roads. Journal of Construction Engineering and Management, 133(5), pp. 393-402. ISSN 0733-9364
Durdyev, S (2021) Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(4), pp. 1241-1260. ISSN 0969-9988
Dursun, O and Stoy, C (2016) Conceptual estimation of construction costs using the multistep ahead approach. Journal of Construction Engineering and Management, 142(9): 04016038, ISSN 0733-9364
Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.
Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: I. Conceptual framework and qualitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016049, ISSN 0733-9364
Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: II. Comparative analysis and quantitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016050, ISSN 0733-9364
Dyer, B D (2010) Construction industry productivity: Examining the effects of omitted variable bias in the census construction price index models. PhD thesis, University of Kentucky, USA.
Dzeng, R J and Wang, S S (2008) An analysis of infrastructure development based on national competitiveness perspectives. Construction Management and Economics, 26(1), pp. 47-61. ISSN 1466433X
Dzeng, R J and Wu, J S (2013) Efficiency measurement of the construction industry in Taiwan: A stochastic frontier cost function approach. Construction Management and Economics, 31(4), pp. 335-344. ISSN 1466433X
Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.
Dzitouo, M (2024) Project performance of relational contracting: A critical success factors perspective. PhD thesis, Capella University, USA.
Eamon, C; Shinki, K; Wong, K H and Alsendi, A (2025) Assessment of pay item specific case-based reasoning approach for bridge unit cost estimation. Journal of Construction Engineering and Management, 151(12): 04025188, ISSN 0733-9364
Easa, S M (1987) Earthwork allocations with nonconstant unit costs. Journal of Construction Engineering and Management, 113(1), pp. 34-50. ISSN 0733-9364
Easa, S M (1988) Earthwork allocations with linear unit costs. Journal of Construction Engineering and Management, 114(4), pp. 641-655. ISSN 0733-9364
Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364
Easa, S M and Can, E K (1985) Optimization model for aggregate blending. Journal of Construction Engineering and Management, 111(3), pp. 216-230. ISSN 0733-9364
Easa, S M and Can, E K (1985) Stochastic priority model for aggregate blending. Journal of Construction Engineering and Management, 111(4), pp. 358-373. ISSN 0733-9364
Ebbert, T (2010) Re-face: Refurbishment strategies for the technical improvement of office façades. PhD thesis, Delft University of Technology, Netherlands.
Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2022) Moderating effect of government support policy on the relationship between Malaysian LCH leakages, high construction cost and LCH demand-supply: A proposed framework. International Journal of Construction Management, 22(4), pp. 600-611. ISSN 1562-3599
Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2023) Mitigating high development cost of low-cost housing: Findings from an empirical investigation. International Journal of Construction Management, 23(3), pp. 472-483. ISSN 1562-3599
Ebekozien, A; Aigbavboa, C; Samsurijan, M S and Thwala, W D (2025) Developing a framework for mitigating pilfering: a case study of selected Nigeria's construction sites via soft system methodology. International Journal of Construction Management, 25(6), pp. 672-681. ISSN 1562-3599
Ebekozien, A; Aigbavboa, C; Thwala, W D; Samsurijan, M S; Hafez Ahmed, M A; Aliu, J and Adekunle, S (2025) Assessment of low-cost housing provision as government social responsibility towards achievement of sustainable development goal 11: stakeholders' perspective. International Journal of Construction Management, 25(7), pp. 802-812. ISSN 1562-3599
Ebekozien, A; Aigbavboa, C O; Thwala, W D; Hafez, M A and Samsurijan, M S (2024) Sustainable development goals under threat: the impact of inflation on construction projects. Engineering, Construction and Architectural Management, 31(13), pp. 323-341. ISSN 0969-9988
Ebiloma, D. O.; Aigbavboa, C. O. and Anumba, C. (2026) Key drivers of digital twin maintenance management for healthcare facilities in Nigeria. Engineering, Construction and Architectural Management, 33(3), pp. 1871-1890. ISSN 0969-9988
Echeverry, D; Ibbs, C W and Burati, J (1988) Graduated unit price payment schedules. Journal of Construction Engineering and Management, 114(1), pp. 1-18. ISSN 0733-9364
Echeverry, D; Ibbs, C W and Kim, S (1991) Sequencing knowledge for construction scheduling. Journal of Construction Engineering and Management, 117(1), pp. 118-130. ISSN 0733-9364
Edison, J C and Singla, H K (2020) Development of a scale for factors causing delays in infrastructure projects in India. Construction Economics and Building, 20(1), pp. 36-55. ISSN 2204-9029
Edwards, D J and Holt, G D (2000) Estivate: A model for calculating excavator productivity and output costs. Engineering, Construction and Architectural Management, 7(1), pp. 52-62. ISSN 0969-9988
Edwards, D J and Holt, G D (2000) Quantifying the cost of plant operators' productivity. Journal of Financial Management of Property and Construction, 5(1-2), pp. 85-92. ISSN 1366-4387
Edwards, D J and Holt, G D (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(6), pp. 417-427. ISSN 0961-3218
Edwards, D J and Holt, G D (2006) Hand-arm vibration controls: A perspective based on performance and cost dimensions. Journal of Financial Management of Property and Construction, 11(1), pp. 21-32. ISSN 1366-4387
Edwards, D J; Holt, G D and Harris, F C (1998) Financial management of construction plant: Conceptualising cost prediction. Journal of Financial Management of Property and Construction, 3(2), pp. 59-74. ISSN 1366-4387
Edwards, D J; Holt, G D and Harris, F C (2000) Estimating life cycle plant maintenance costs. Construction Management and Economics, 18(4), pp. 427-435. ISSN 01446193
Edwards, D J; Holt, G D and Harris, F C (2002) Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry. Construction Management and Economics, 20(7), pp. 581-591. ISSN 01446193
Edwards, D J; Nicholas, J and Sharp, R (2001) Forecasting UK construction plant sales. Engineering, Construction and Architectural Management, 8(3), pp. 171-176. ISSN 0969-9988
Edwards, D J; Thorpe, T and Love, P (2004) Financial implications of poorly utilised construction plant and equipment. Journal of Financial Management of Property and Construction, 9(1), pp. 3-12. ISSN 1366-4387
Edwards, P J and Bowen, P A (1998) Practices, barriers and benefits of risk management process in building services costs estimation: Comment. Construction Management and Economics, 16(1), pp. 105-108. ISSN 01446193
Edwards, P J and Edwards, M (1995) A price-rationalized approach to item separation in the measurement of concrete work. Construction Management and Economics, 13(6), pp. 485-491. ISSN 01446193
Efebeli, T V (2021) Strategies for reducing project cost overruns in the oil and gas construction industry. PhD thesis, Walden University, USA.
Egger, C S (2015) Sewer rehabilitation planning under uncertainty. PhD thesis, ETH Zürich, Switzerland.
Egger, H S (1986) Business techniques and skills utilized by small residential contractors with one to four employees in six high growth areas of Texas. EdD thesis, Texas A&M University, USA.
Eid, M E M (2004) Rethinking relationships in the construction industry: integrating sustainable development into project management processes. PhD thesis, University of Edinburgh, UK.
Eiris, R; Jain, E; Gheisari, M and Wehle, A (2021) Online hazard recognition training: Comparative case study of static images, cinemagraphs, and videos. Journal of Construction Engineering and Management, 147(8): 04021082, ISSN 0733-9364
Eizak Shiri, F (2015) Planning intentionality and its implications for project planned time. PhD thesis, University of Manchester, UK.
Eizakshiri, F; Chan, P W and Emsley, M (2011) Delays, what delays? A critical review of the literature on delays in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects. PhD thesis, Aston University, UK.
Ekung, S; Odesola, I A and Adewuyi, T (2022) Green cost premium for attaining energy-efficiency rating in Nigeria's hot-humid residential buildings. International Journal of Building Pathology and Adaptation, 40(2), pp. 248-268. ISSN 23984708
El Anwar, O H E D (2009) Multi-objective optimization for temporary housing arrangements after natural disasters. PhD thesis, University of Illinois at Urbana-Champaign, USA.
El Said, S F (2022) A modeling approach to indexing the cost of highway construction and maintenance projects to a responsive highway user fee using bid items data. PhD thesis, Vanderbilt University, USA.
El Sawalhi, N I H (2007) Developing a model for construction contractors pre-qualification in the Gaza Strip and West Bank. PhD thesis, University of Salford, UK.
El Sayed, A Y; Darwish, M and Nassar, K (2021) Design and constructability of novel extendable arched steel truss falsework. Journal of Construction Engineering and Management, 147(3): 04020187, ISSN 0733-9364
El-Anwar, O and Aziz, T A (2014) Integrated urban-construction planning framework for slum upgrading projects. Journal of Construction Engineering and Management, 140(4): B4014003, ISSN 0733-9364
El-Anwar, O and Chen, L (2013) Computing a displacement distance equivalent to optimize plans for postdisaster temporary housing projects. Journal of Construction Engineering and Management, 139(2), pp. 174-184. ISSN 0733-9364
El-Aroud, A S (1980) Road network investment model for developing countries. PhD thesis, Pennsylvania State University, USA.
El-Choum, M K (1994) Identification and modelling of construction cost overruns parameters for public infrastructure projects using multivariate statistical methods. PhD thesis, Stevens Institute of Technology, USA.
El-Gohary, K M; Aziz, R F and Abdel-Khalek, H A (2017) Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8): 04017045, ISSN 0733-9364
El-Hamrawy, S A K; El-Maaty, A E A and Akal, A Y (2017) Proposed models to measure the quality of highway projects regression analysis vs statistical: fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988
El-Hamrawy, S A-K; Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988
El-Kelesh, A M and Hassan, D A (2023) Impact of ground conditions and excavation depth on selection of excavation support system. International Journal of Construction Management, 23(15), pp. 2539-2550. ISSN 1562-3599
El-Khatib, A and Salhieh, S M (2026) Interconnected success factors for offsite modular construction in developing economies: A fuzzy-DEMATEL approach. International Journal of Construction Management, 26(3), pp. 445-469. ISSN 1562-3599
El-Kholy, A M (2021) Exploring the best ANN model based on four paradigms to predict delay and cost overrun percentages of highway projects. International Journal of Construction Management, 21(7), pp. 694-712. ISSN 1562-3599
El-Kholy, A M and Akal, A Y (2021) Determining the stationary financial cause of contracting firms failure. International Journal of Construction Management, 21(8), pp. 818-833. ISSN 1562-3599
El-Kholy, A M and Akal, A Y (2021) Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects. Engineering, Construction and Architectural Management, 28(10), pp. 3014-3040. ISSN 0969-9988
El-Kholy, A M; Tahwia, A M and Elsayed, M M (2022) Prediction of simulated cost contingency for steel reinforcement in building projects: ANN versus regression-based models. International Journal of Construction Management, 22(9), pp. 1675-1689. ISSN 1562-3599
El-Mashaleh, M; O'Brien, W J and Minchin Jr, R E (2006) Firm performance and information technology utilization in the construction industry. Journal of Construction Engineering and Management, 132(5), pp. 499-507. ISSN 0733-9364
El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364
El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364
El-Rayes, K and Moselhi, O (2001) Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, 127(2), pp. 125-131. ISSN 0733-9364
El-Sabek, L M (2017) Framework for managing integration challenges of production planning and control in international construction mega-projects. PhD thesis, University of Toronto, Canada.
El-Sabek, L M and McCabe, B Y (2018) Coordination challenges of production planning in the construction of international mega-projects in the middle East. International Journal of Construction Education and Research, 14(2), pp. 118-40. ISSN 1557-8771
El-Samadony, A A E-Y (1986) Development of an improved construction bidding model incorporating multiple objective functions. PhD thesis, University of Leeds, UK.
El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175
El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.
El-Sayegh, S M; AbdRaboh, T; Elian, D; ElJarad, N and Ahmad, Y (2022) Developing a bi-parameter bidding model integrating price and sustainable construction practices. International Journal of Construction Management, 22(11), pp. 2191-2198. ISSN 1562-3599
El-Sharkawy, A R (1993) Pricing construction contracts under inflation. PhD thesis, North Carolina State University, USA.
El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling. PhD thesis, Iowa State University, USA.
ElAlem, M A; Mahdi, I M; Mohamadien, H A and Hosny, S (2025) Forecasting scope creep in Egyptian construction projects: An evaluation using artificial neural network (ANN) and random forest models. International Journal of Construction Management, 25(16), pp. 2082-2101. ISSN 1562-3599
Elazhary, M. and El-Adaway, I. H. (2026) Managing risks under nuclear power plant projects: A latent similarity-guided contract customization. Journal of Construction Engineering and Management, 152(7): 04026089, ISSN 0733-9364
Elazouni, A M; Ali, A E and Abdel-Razek, R H (2005) Estimating the acceptability of new formwork systems using neural networks. Journal of Construction Engineering and Management, 131(1), pp. 33-41. ISSN 0733-9364
Elbehairy, H (2007) Bridge management system with integrated life cycle cost optimization. PhD thesis, University of Waterloo, Canada.
Eldin, N N (1991) Management of engineering/design phase. Journal of Construction Engineering and Management, 117(1), pp. 163-175. ISSN 0733-9364
Eldin, N N and Mayfield, J (2005) Determination of most economical scrapers fleet. Journal of Construction Engineering and Management, 131(10), pp. 1109-1114. ISSN 0733-9364
Eldukair, Z A R (1988) Safety assessment and optimization of construction operations based on fuzzy sets. PhD thesis, University of Maryland, College Park, USA.
Elghaish, F and Abrishami, S (2021) A centralised cost management system: Exploiting EVM and abc within IPD. Engineering, Construction and Architectural Management, 28(2), pp. 549-569. ISSN 0969-9988
Elghaish, F; Abrishami, S; Hosseini, M R and Abu-Samra, S (2020) Revolutionising cost structure for integrated project delivery: A BIM-based solution. Engineering, Construction and Architectural Management, 28(4), pp. 1214-1240. ISSN 0969-9988
Elghaish, F; Matarneh, S; Abdellatef, E; Rahimian, F; Hosseini, M R and Farouk Kineber, A (2025) Multi-layers deep learning model with feature selection for automated detection and classification of highway pavement cracks. Smart and Sustainable Built Environment, 14(2), pp. 511-535. ISSN 2046-6099
Elghaish, F; Matarneh, S T; Talebi, S; Abu-Samra, S; Salimi, G and Rausch, C (2022) Deep learning for detecting distresses in buildings and pavements: A critical gap analysis. Construction Innovation, 22(3), pp. 554-579. ISSN 1471-4175
Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.
Elghamrawy, T M (2011) Optimizing work zone practices for highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.
Elhag, T M S and Boussabaine, A H (1998) An artificial neural system for cost estimation of construction projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Elhag, T M S and Boussabaine, A H (2001) Tender price estimation using artificial neural networks. Journal of Financial Management of Property and Construction, 6(3), pp. 193-208. ISSN 1366-4387
Elhag, T M S and Boussabaine, A H (2002) Tender price estimation using artificial neural networks II: Modelling. Journal of Financial Management of Property and Construction, 7(1), pp. 49-64. ISSN 1366-4387
Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364
Elhakeem, A A M (2006) An asset management framework for educational buildings with life-cycle cost analysis. PhD thesis, University of Waterloo, Canada.
Elhegazy, H; Ebid, A; Mahdi, I; Haggag, S and Abdul-Rashied, I (2021) Implementing QFD in decision making for selecting the optimal structural system for buildings. Construction Innovation, 21(2), pp. 345-360. ISSN 1471-4175
Elinwa, A U and Buba, S A (1993) Construction cost factors in Nigeria. Journal of Construction Engineering and Management, 119(4), pp. 698-713. ISSN 0733-9364
Elkholosy, H; Ead, R; Hammad, A and AbouRizk, S (2024) Data mining for forecasting labor resource requirements: A case study of project management staffing requirements. International Journal of Construction Management, 24(5), pp. 561-572. ISSN 1562-3599
Elliott, J W; Glick, S and Valdes-Vasquez, R (2019) Student perceptions of model-based estimating. International Journal of Construction Education and Research, 15(2), pp. 118-135. ISSN 1557-8771
Ellis, L; Martin, H and Ramcharitar, S (2019) Factors influencing triple constraints in public sector projects in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 157-169. ISSN 17514304
Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.
Ellis Jr, R D and Lee, S H (2006) Measuring project level productivity on transportation projects. Journal of Construction Engineering and Management, 132(3), pp. 314-320. ISSN 0733-9364
Elmousalami, H H (2020) Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. Journal of Construction Engineering and Management, 146(1): 03119008, ISSN 0733-9364
Elmousalami, H H; Ali, A H; Kineber, A F and Elyamany, A (2024) A novel conceptual cost estimation decision-making model for field canal improvement projects. International Journal of Construction Management, 24(6), pp. 651-663. ISSN 1562-3599
Elmousalami, H H; Elyamany, A H and Ibrahim, A H (2018) Predicting conceptual cost for field canal improvement projects. Journal of Construction Engineering and Management, 144(11): 04018102, ISSN 0733-9364
Elshaboury, N; Mohammed Abdelkader, E; Al-Sakkaf, A and Bagchi, A (2025) A deep convolutional neural network for predicting electricity consumption at grey nuns building in Canada. Construction Innovation, 25(2), pp. 270-289. ISSN 1471-4175
Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.
Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects. PhD thesis, Heriot-Watt University, UK.
Eltinay, N and Egbu, C (2017) Disaster risk reduction conceptual framework: Open data for building resilience in critical infrastructure. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Elyamany, A and Abdelrahman, M (2010) Contractor performance evaluation for the best value of Superpave projects. Journal of Construction Engineering and Management, 136(5), pp. 606-614. ISSN 0733-9364
Elyamany, A H M (2010) Developing a rational approach for contractor selection based on history of construction quality and long-term performance. PhD thesis, North Dakota State University, USA.
Emam, H; Farrell, P and Ahmed, S (2016) Formulating a linear scheduling development index. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 188-198. ISSN 17514304
Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.
Emetere, M E (2019) A modified approach to estimating thermodynamic impact on buildings: A case study of poor urban setting in Lagos state. Journal of Engineering, Design and Technology, 17(1), pp. 115-135. ISSN 1726-0531
Emsley, M W; Lowe, D J; Duff, A R; Harding, A and Hickson, A (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20(6), pp. 465-472. ISSN 01446193
Emuze, F and Ravu, P (2014) Optimism bias, pathogens and cost overrun: The case of an RTS project in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Emuze, F and Smallwood, J J (2012) Bridging public works project performance gaps in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 111-118. ISSN 17514312
Emuze, F A (2022) Addressing violations of safe work procedures in South African construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(3), pp. 113-121. ISSN 17514304
Enshassi, A; Al-Najjar, J and Kumaraswamy, M (2009) Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), pp. 126-151. ISSN 1366-4387
Enshassi, A; Kumaraswamy, M and Jomah, A N (2010) Significant factors causing time and cost overruns in construction projects in the Gaza Strip: Contractors' perspective. International Journal of Construction Management, 10(1), pp. 35-60. ISSN 1562-3599
Enshassi, A; Mohamed, S and Abdel-Hadi, M (2013) Factors affecting the accuracy of pre-tender cost estimates in the Gaza Strip. Journal of Construction in Developing Countries, 18(1), pp. 73-94. ISSN 1823-6499
Enshassi, A; Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), pp. 115-125. ISSN 1366-4387
Enshassi, A; Rashid Abdul Aziz, A and Karriri, A (2008) Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13(1), pp. 35-47. ISSN 1366-4387
Enshassi, M S A; Walbridge, S; West, J S and Haas, C T (2020) Dynamic and proactive risk-based methodology for managing excessive geometric variability issues in modular construction projects using Bayesian theory. Journal of Construction Engineering and Management, 146(2): 04019096, ISSN 0733-9364
Erbatur, O C (2012) A methodology for estimating construction unit bid prices. DEng thesis, Texas A&M University, USA.
Eriksson, T and Kadefors, A (2012) Trust, control and knowledge integration in a rock tunnel project. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Erk, E Y; Budayan, C; Koc, K and Tokdemir, O B (2023) Value creation in PPP projects undertaken in the Turkish healthcare industry. Journal of Construction Engineering and Management, 149(11): 04023108, ISSN 0733-9364
Ernzen, J J and Schexnayder, C (2000) One company's experience with design/build: Labor cost risk and profit potential. Journal of Construction Engineering and Management, 126(1), pp. 10-14. ISSN 0733-9364
Eromobor, S O; Das, D K and Emuze, F (2020) Influence of building and indoor environmental parameters on designing energy-efficient buildings. International Journal of Building Pathology and Adaptation, 39(3), pp. 507-524. ISSN 23984708
Esders, M C (2017) Consideration of uncertain future demand and decision flexibility in the determination of intervention programs for buildings. DSc thesis, ETH Zürich, Switzerland.
Eslamirad, N; Malekpour Kolbadinejad, S; Mahdavinejad, M and Mehranrad, M (2020) Thermal comfort prediction by applying supervised machine learning in green sidewalks of Tehran. Smart and Sustainable Built Environment, 9(4), pp. 361-374. ISSN 2046-6099
Esmaeeli, A N and Heravi, G (2019) Real options approach versus conventional approaches to valuing highway projects under uncertainty. Journal of Construction Engineering and Management, 145(11): 04019068, ISSN 0733-9364
Esmaili, O (2014) Developing a rapid seismic performance based rating system in safety assessment of buildings. PhD thesis, University of California, Irvine, USA.
Espinoza, R D (2011) Contingency estimating using option pricing theory: Closing the gap between theory and practice. Construction Management and Economics, 29(9), pp. 913-927. ISSN 1466433X
Essa, R and Fortune, C (2006) Project price forecasting processes and pre-construction evaluation of sustainable housing association projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Essa, R and Fortune, C (2008) Pre-construction evaluation practices of sustainable housing projects in the UK. Engineering, Construction and Architectural Management, 15(6), pp. 514-526. ISSN 0969-9988
Essa, R A (2008) A framework for the pre-construction evaluation of sustainable housing projects in the UK. PhD thesis, Heriot-Watt University, UK.
Essiet, U M (2016) Developing a framework to facilitate the assessment of asset management information quality in facilities management operations. PhD thesis, University of Huddersfield, UK.
Etemadinia, H and Tavakolan, M (2021) Using a hybrid system dynamics and interpretive structural modeling for risk analysis of design phase of the construction projects. International Journal of Construction Management, 21(1), pp. 93-112. ISSN 1562-3599
Evans, R C (2002) Dynamic cash flow forecasting model for construction contractors. PhD thesis, University of Liverpool, UK.
Evans, R C and Kaka, A P (1998) Analysis of the accuracy of standard/average value curves using food retail building projects as case studies. Engineering, Construction and Architectural Management, 5(1), pp. 58-67. ISSN 0969-9988
Evans, R C; Kaka, A P and Lewis, J (1997) Adopting a semi-ideographic approach to cash flow forecasting. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Ewart, K and Silcock, G (1987) An analysis of the cost of compliance with the fire services order, Northern Ireland, 1985. Construction Management and Economics, 5(1), pp. 3-12. ISSN 01446193
Ewin, N A; Oxley, R and Poole, F (1990) Advanced applications software for speculative housing companies. Construction Management and Economics, 8(2), pp. 109-133. ISSN 01446193
Eybpoosh, M; Dikmen, I and Birgonul, M T (2011) Identification of risk paths in international construction projects using structural equation modeling. Journal of Construction Engineering and Management, 137(12), pp. 1164-1175. ISSN 0733-9364
Eyre, N; Fawcett, T; Topouzi, M; Killip, G; Oreszczyn, T; Jenkinson, K and Rosenow, J (2023) Fabric first: Is it still the right approach? Buildings & Cities, 4(1), pp. 965-972. ISSN 2632-6655
Eze, E C; Aghimien, D O; Aigbavboa, C O and Sofolahan, O (2024) Building information modelling adoption for construction waste reduction in the construction industry of a developing country. Engineering, Construction and Architectural Management, 31(6), pp. 2205-2223. ISSN 0969-9988
Ezeldin, A S and Sharara, L M (2006) Neural networks for estimating the productivity of voncreting activities. Journal of Construction Engineering and Management, 132(6), pp. 650-656. ISSN 0733-9364
Ezzeddine, A; Shehab, L; Srour, I; Power, W; Zankoul, E and Freiha, E (2023) Ccc_implementing the construction control room on a fast-paced project: The case study of the beirut port explosion. International Journal of Construction Management, 23(5), pp. 745-755. ISSN 1562-3599
Faccio, M; Gamberi, M; Nedaei, M and Pilati, F (2018) Technical and economic modelling and evaluation of a water distribution system equipped with an autoclave for industrial production applications. Journal of Engineering, Design and Technology, 16(3), pp. 342-359. ISSN 1726-0531
Fadiya, O; Georgakis, P; Chinyio, E and Nwagboso, C (2015) Decision-making framework for selecting ICT-based construction logistics systems. Journal of Engineering, Design and Technology, 13(2), pp. 260-281.
Fadiya, O O; Georgakis, P; Chinyio, E and Akadiri, P (2013) Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft. Journal of Financial Management of Property and Construction, 18(2), pp. 128-141. ISSN 1366-4387
Faghih, S A M and Kashani, H (2018) Forecasting construction material prices using vector error correction model. Journal of Construction Engineering and Management, 144(8): 04018075, ISSN 0733-9364
Fahid, S (2007) An investigation of the effectiveness of total quality management in the UK construction industry: An empirical study. PhD thesis, Heriot-Watt University, UK.
Falta, M and Gallery, N (2011) Unintended consequences of regulatory reporting requirements for small and medium size construction entities: Australian evidence. Construction Management and Economics, 29(11), pp. 1121-1135. ISSN 1466433X
Famiyeh, S; Amoatey, C T; Adaku, E and Agbenohevi, C S (2017) Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana. Journal of Engineering, Design and Technology, 15(2), pp. 181-198.
Fan, S. L.; Lu, S. M.; Recha, F.; Ong, W. S. and Tseng, T. S. (2026) Automatic BIM-based formwork quantification system. Journal of Construction Engineering and Management, 152(7): 04026082, ISSN 0733-9364
Fan, S L; Yeh, I C and Chi, W S (2021) Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis. Journal of Construction Engineering and Management, 147(7): 04021050, ISSN 0733-9364
Fang, Y and Ng, S T (2011) Applying activity-based costing approach for construction logistics cost analysis. Construction Innovation, 11(3), pp. 259-281. ISSN 1471-4175
Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988
Farahani, A (2019) A systematic approach to strategic maintenance and renovation planning in multifamily buildings. PhD thesis, Chalmers University of Technology, Sweden.
Farahani, A; Wallbaum, H and Dalenbäck, J O (2019) Optimized maintenance and renovation scheduling in multifamily buildings: a systematic approach based on condition state and life cycle cost of building components. Construction Management and Economics, 37(3), pp. 139-155. ISSN 01446193
Farahani, A; Wallbaum, H and Dalenbäck, J O (2020) Cost-optimal maintenance and renovation planning in multifamily buildings with annual budget constraints. Journal of Construction Engineering and Management, 146(3): 04020009, ISSN 0733-9364
Farbarik, J J (1994) Evaluation of the efficacy of using bid data to predict construction cost overruns. PhD thesis, University of Washington, USA.
Fares, A; Elazouni, A and Al-Alawi, M (2025) Using game theory to negotiate win-win payment terms between contractors and subcontractors. Journal of Construction Engineering and Management, 151(5): 04025023, ISSN 0733-9364
Farghal, S H and Everett, J G (1997) Learning curves: Accuracy in predicting future performance. Journal of Construction Engineering and Management, 123(1), pp. 41-45. ISSN 0733-9364
Farid, F and Koning, T L (1994) Simulation verifies queuing program for selecting loader-truck fleets. Journal of Construction Engineering and Management, 120(2), pp. 386-404. ISSN 0733-9364
Farmer, H K (2003) Managing maintenance of multiple domestic accommodation. PhD thesis, Loughborough University, UK.
Farnsworth, C B; Warr, R O; Weidman, J E and Mark Hutchings, D (2016) Effects of CM/GC project delivery on managing process risk in transportation construction. Journal of Construction Engineering and Management, 142(3): 04015091, ISSN 0733-9364
Farokhnia, K (2013) Nonstructural vulnerability functions for building categories. PhD thesis, University of Colorado at Boulder, USA.
Farooghi, F (2020) The effect of natural disasters on construction labor wage fluctuations: A spatial difference-in-difference analysis. PhD thesis, University of Texas at Arlington, USA.
Farooq, M. and Paracha, A. T. (2026) Cost prediction of road construction projects in Pakistan using machine learning. International Journal of Construction Management, 26(8), pp. 1442-1470. ISSN 1562-3599
Farouk, A M and Rahman, R A (2025) Integrated applications of building information modeling in project cost management: A systematic review. Journal of Engineering, Design and Technology, 23(1), pp. 287-305. ISSN 1726-0531
Farrell, M L (1997) Illiquidity, uncertainty and the impact of the term structure of interest rates on the valuation of real estate in a context of Knight-Keynes uncertainty. Journal of Financial Management of Property and Construction, 2(3), pp. 5-30. ISSN 1366-4387
Farrell, M L (1999) The evolution of value theory and the practice of real estate valuation. Journal of Financial Management of Property and Construction, 4(2), pp. 5-32. ISSN 1366-4387
Farrington, J J (1987) A methodology to identify and categorize costs of quality deviations in design and construction. PhD thesis, Clemson University, USA.
Farshchian, M M and Heravi, G (2018) Probabilistic assessment of cost, time, and revenue in a portfolio of projects using stochastic agent-based simulation. Journal of Construction Engineering and Management, 144(5): 4018028, ISSN 0733-9364
Farshchian, M M; Heravi, G and Abourizk, S (2017) Optimizing the owner's scenarios for budget allocation in a portfolio of projects using agent-based simulation. Journal of Construction Engineering and Management, 143(7): 04017022, ISSN 0733-9364
Farzin, A; Ghazi, M; Sotoodeh, A F and Nikian, M (2021) Economic optimization of heat exchanger networks based on geometric parameters using hybrid genetic-particle swarm algorithm technique. Journal of Engineering, Design and Technology, 19(4), pp. 989-1015. ISSN 1726-0531
Fatayer, F A; Issa, A Z; Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(7), pp. 2577-2598. ISSN 0969-9988
Fateh, M A M; Supian, A N and Goh, C S (2024) Managing emotional intelligence of construction players during COVID-19 in Malaysia. Journal of Construction in Developing Countries, 29(1), pp. 191-210. ISSN 1823-6499
Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.
Faubel, C.; Mowen, D.; Miri, M.; Demarquet Alban, U.; Martinez-Molina, A. and Alamaniotis, M. (2026) Multimodal transformer models for real-time estimation of indoor environmental quality in educational settings. Smart and Sustainable Built Environment, pp. 1-37. ISSN 2046-6099
Fayek, Aminah (1996) A competitive estimating and tendering strategy model for use in the civil engineering construction industry. PhD thesis, University of Melbourne, Australia.
Fazeli, A; Banihashemi, S; Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: The resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(5), pp. 1896-1922. ISSN 0969-9988
Fazeli, A; Dashti, M S; Jalaei, F and Khanzadi, M (2021) An integrated BIM-based approach for cost estimation in construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2828-2854. ISSN 0969-9988
Fazil, M W; Muhamad Tamyez, P F and Lee, C K (2024) Enhancing cost estimation performance through effective organizational control: The moderating role of project complexity in construction projects. International Journal of Construction Management, 24(15), pp. 1630-1642. ISSN 1562-3599
Fazlipour, M and Samadzad, M (2026) Engineering and economic feasibility of a new prefabrication ecosystem for steel construction in diverse low-rise residential buildings. Journal of Construction Engineering and Management, 152(2): 04025238, ISSN 0733-9364
Feghaly, J (2020) Innovative delivery of water infrastructure projects. PhD thesis, Arizona State University, USA.
Feige, A; McAllister, P and Wallbaum, H (2013) Rental price and sustainability ratings: Which sustainability criteria are really paying back? Construction Management and Economics, 31(4), pp. 322-334. ISSN 1466433X
Feldbauer, R R (2019) Mindful project management: a framework to enhance underperformance managing large hospital builds by incorporating principles adapted from High Reliability Organizations. PhD thesis, University of Liverpool, UK.
Feng, Chen (2015) Camera marker networks for pose estimation and scene understanding in construction automation and robotics. PhD thesis, University of Michigan, USA.
Feng, K; Xiong, W; Wang, S; Wu, C and Xue, Y (2017) Optimizing an equity capital structure model for public-private partnership projects involved with public funds. Journal of Construction Engineering and Management, 143(9): 04017067, ISSN 0733-9364
Feng, Y (2015) Mathematical models for determining the minimum level of voluntary safety investments for building projects. Journal of Construction Engineering and Management, 141(7): 4015015, ISSN 0733-9364
Fereidouni, H G (2011) Factors contributing to the fluctuation in residential construction in Iran. Construction Economics and Building, 11(4), pp. 77-86. ISSN 2204-9029
Fereshtehnejad, S (2018) Multi-hazard lifecycle methods for aging structures and infrastructure systems. PhD thesis, Ohio State University, USA.
Ferguson, D W (1993) Public works program management using owner-consultant partnerships: Organizational factors influencing effectiveness. PhD thesis, Claremont Graduate University, USA.
Fernandes, Luciana Oliveira (2015) Procedure for retrofit of the heat power performance of educational buildings by applying passive strategies conditioning. PhD thesis, Universidade Estadual de Campinas, Brazil.
Fernandez-Solis, J L (2013) Building construction: A deterministic non-periodic flow-a case study of chaos theories in tracking production flow. Architectural Engineering and Design Management, 9(1), pp. 21-48. ISSN 1745-2007
Fernando, N; T.A, K D and Zhang, H (2024) An artificial neural network (ann) approach for early cost estimation of concrete bridge systems in developing countries: The case of Sri Lanka. Journal of Financial Management of Property and Construction, 29(1), pp. 23-51. ISSN 1366-4387
Fernández, A I; Jarufe, J; Segarra, P and Cavieres, P (2025) Management of construction planning process in massive underground mining by integrating LPS and cit through action research. Journal of Construction Engineering and Management, 151(5): 04025024, ISSN 0733-9364
Ferreira Bastos, M; Loforte Ribeiro, F and Cardoso Teixeira, J (2005) Estimating of capital cost of underground car parking project. Journal of Financial Management of Property and Construction, 10(2), pp. 126-132. ISSN 1366-4387
Fettermann, D C; Borriello, A; Pellegrini, A; Cavalcante, C G; Rose, J M and Burke, P F (2021) Getting smarter about household energy: The who and what of demand for smart meters. Building Research & Information, 49(1), pp. 100-112. ISSN 0961-3218
Fifield, L-J (2017) Monitoring UK hospital building type performance. PhD thesis, Loughborough University, UK.
Finegan, E; Kelly, G and O’Sullivan, G (2020) Comparative analysis of passivhaus simulated and measured overheating frequency in a typical dwelling in Ireland. Building Research & Information, 48(6), pp. 681-699. ISSN 0961-3218
Finke, M R (1998) A better way to estimate and mitigate disruption. Journal of Construction Engineering and Management, 124(6), pp. 490-497. ISSN 0733-9364
Firouzi, A; Yang, W and Li, C Q (2016) Prediction of total cost of construction project with dependent cost items. Journal of Construction Engineering and Management, 142(12): 04016072, ISSN 0733-9364
Fischer, K; Leidel, K; Riemann, A and Alfen, H W (2010) An integrated risk management system (IRMS) for PPP projects. Journal of Financial Management of Property and Construction, 15(3), pp. 260-282. ISSN 1366-4387
Fischer, M A and Aalami, F B (1996) Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management, 122(4), pp. 337-347. ISSN 0733-9364
Fisher, D J; O'Neill, M W and Contreras, J C (1995) DS^2: Drilled shaft decision support system. Journal of Construction Engineering and Management, 121(1), pp. 86-94. ISSN 0733-9364
Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments. PhD thesis, Columbia University, USA.
Fitch, G J; Odeh, I and William Ibbs, C (2015) Economic sustainability of dbo water based on wastewater projects in the U.S.: Three case studies. Journal of Construction Engineering and Management, 141(5): 05015001, ISSN 0733-9364
Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.
Flanagan, R; Kendell, A; Norman, G and Robinson, G D (1987) Life cycle costing and risk management. Construction Management and Economics, 5(4), ISSN 01446193
Flanagan, R and Norman, G (1982) Risk analysis: An extension of price prediction techniques for building work. Construction Papers, 1(3), pp. 27-34. ISSN 0144-8587
Flinkman, M (1994) The market for sawnwood in Germany: Analysis and forecast to the year 2000. SkoglDr thesis, Sveriges Lantbruksuniversitet, Sweden.
Flood, C and Scott, L (2020) Thermal analysis and post construction verification. International Journal of Building Pathology and Adaptation, 38(1), pp. 51-67. ISSN 23984708
Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.
Forbes, D; El-Haram, M; Horner, M; Hatton, D and Evans, A (2009) Estimating the labour demand for housing construction. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Forbes, D; Smith, S D and Horner, M (2009) Risk and its analysis in the sustainability assessment of the built environment. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Forbes, D R; McGurnaghan, H; Graham, L D and Smith, S D (2004) Concrete placing productivity using a novel neural network design. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Forbes, Lincoln Harding (1999) An engineering management-based investigation of owner satisfaction, quality and performance variables in health care facilities construction. PhD thesis, University of Miami, USA.
Ford, B; Wilson, R; Gillott, M; Ibraheem, O; Salmeron, J and Sanchez, F J (2012) Passive downdraught evaporative cooling: Performance in a prototype house. Building Research & Information, 40(3), pp. 290-304. ISSN 0961-3218
Ford, D N (2002) Achieving multiple project objectives through contingency management. Journal of Construction Engineering and Management, 128(1), pp. 30-39. ISSN 0733-9364
Ford, D N; Anderson, S D; Damron, A J; De Las Casas, R; Gokmen, N and Kuennen, S T (2004) Managing constructibility reviews to reduce highway project durations. Journal of Construction Engineering and Management, 130(1), pp. 33-42. ISSN 0733-9364
Ford, D N; Lander, D M and Voyer, J J (2002) A real options approach to valuing strategic flexibility in uncertain construction projects. Construction Management and Economics, 20(4), pp. 343-351. ISSN 01446193
Forgues, D (2008) Using boundary objects to generate better value in the construction industry. PhD thesis, University of Salford, UK.
Forgues, Daniel (2008) Using boundary objects to generate better value in the construction industry: Interpreting cases from an activity theory perspective. PhD thesis, University of Salford, UK.
Formoso, C T and Jobim, M S S (2006) Challenges in improving customer focus in small-sized house-building companies in Brazil. Journal of Construction in Developing Countries, 11(2), pp. 77-101. ISSN 1823-6499
Forsythe, P J and Sepasgozar, S M E (2019) Measuring installation productivity in prefabricated timber construction. Engineering, Construction and Architectural Management, 26(4), pp. 578-598. ISSN 0969-9988
Fortune, C and Cox, O (2005) Current practices in building project contract price forecasting in the UK. Engineering, Construction and Architectural Management, 12(5), pp. 446-457. ISSN 0969-9988
Fortune, C and Hinks, J (1997) Model selection criteria in building project price forecast formulation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Foster, R D (1982) Does pictorial documentation improve construction cost control? PhD thesis, Texas A&M University, USA.
Fox, D S J (1994) Knowledge-based systems for the demolition industry. PhD thesis, University of Portsmouth, UK.
Francis, A; Padmanabhan, V and Thomas, A (2025) A life cycle assessment-based case study analysis of the sustainability of "vernacular" versus contemporary construction techniques. Engineering, Construction and Architectural Management, 32(9), pp. 6187-6212. ISSN 0969-9988
Franco-Duran, D M and De La Garza, J M (2020) Performance of resource-constrained scheduling heuristics. Journal of Construction Engineering and Management, 146(4): 04020026, ISSN 0733-9364
Franz, B; Molenaar, K R and Roberts, B A M (2020) Revisiting project delivery system performance from 1998 to 2018. Journal of Construction Engineering and Management, 146(9): 04020100, ISSN 0733-9364
Frei, M (2021) Data-driven building retrofit using a wireless sensor network. DSc thesis, ETH Zürich, Switzerland.
Freitas, J A; Sanquetta, C R; Iwakiri, S and de Mello Maron da Costa, M D R (2021) The use of wood construction materials as a way of carbon storage in residential buildings in Brazil. International Journal of Construction Management, 21(3), pp. 292-298. ISSN 1562-3599
Frimpong, S; Sunindijo, R Y; Wang, C C; Boadu, E F; Dansoh, A and Fagbenro, R K (2025) A scoping review of research on mental health conditions among young construction workers. Construction Innovation, 25(1), pp. 5-34. ISSN 1471-4175
Frimpong, Y and Oluwoye, J (2003) Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. Journal of Construction Research, 4(2), pp. 175-187. ISSN 1609-9451
Froese, T M (1992) Integrated computer-aided project management through standard object-oriented models. PhD thesis, Stanford University, USA.
Fu, E; Newell, D; Becker, A; Schwegler, B and Fischer, M (2013) Is adaptation sustainable? A method to estimate climate-critical construction resource capacity. Construction Innovation, 13(2), pp. 202-216. ISSN 1471-4175
Fu, J; Tian, H; Song, L; Li, M; Bai, S and Ren, Q (2021) Productivity estimation of cutter suction dredger operation through data mining and learning from real-time big data. Engineering, Construction and Architectural Management, 28(7), pp. 2023-2041. ISSN 0969-9988
Fu, Y (2019) Organizational governance and value creation: An empirical study in megaproject contexts. PhD thesis, University of Manchester, UK.
Fuentes, M and Smyth, H (2016) Value co-creation in a project setting: A service-dominant logic perspective. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Fujimoto, A; Matsui, K; Ozawa, K and Muratsubaki, Y (2000) New design standard for civil engineering structures based on the minimum labour concept. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Funches Allen, Dawn (2025) Analyzing factors that contribute to cost overruns on department of defense (dod) contractor programs. DEngr thesis, George Washington University, USA.
Fung, W P (2015) Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage: The relationship with project performance. PhD thesis, University of Malaya, Malaysia.
Gabrielli, M F (2009) Structural analysis of auction models. PhD thesis, Pennsylvania State University, USA.
Gaikwad, S V; Calahorra-Jimenez, M; Molenaar, K R and Torres-Machi, C (2021) Challenges in engineering estimates for best value design-build highway projects. Journal of Construction Engineering and Management, 147(7): 04021065, ISSN 0733-9364
Gajpal, Y and Elazouni, A (2015) Enhanced heuristic for finance-based scheduling of construction projects. Construction Management and Economics, 33(7), pp. 531-553. ISSN 01446193
Galanis, P (2014) Probabilistic methods to identify seismically hazardous older-type concrete frame buildings. PhD thesis, University of California, Berkeley, USA.
Galbraith, G H; McLean, R C and Guo, J S (1998) Moisture permeability data presented as a mathematical relationship. Building Research & Information, 26(3), pp. 157-168. ISSN 0961-3218
Galbraith, G H; McLean, R C and Kelly, D (1997) Moisture permeability measurements under varying barometric pressure. Building Research & Information, 25(6), pp. 348-353. ISSN 0961-3218
Galvin, R (2015) Integrating the rebound effect: Accurate predictors for upgrading domestic heating. Building Research & Information, 43(6), pp. 710-722. ISSN 0961-3218
Galvin, R (2023) How prebound effects compromise the market premium for energy efficiency in German house sales. Building Research & Information, 51(5), pp. 501-517. ISSN 0961-3218
Gamez, E A (2009) Risk assessment for international development projects: Owner's perspective. PhD thesis, Northeastern University, USA.
Gamil, Y and Abdul Rahman, I (2019) Awareness and challenges of building information modelling (BIM) implementation in the Yemen construction industry. Journal of Engineering, Design and Technology, 17(5), pp. 1077-1084. ISSN 1726-0531
Gamil, Y and Abdul Rahman, I (2020) Assessment of critical factors contributing to construction failure in Yemen. International Journal of Construction Management, 20(5), pp. 429-436. ISSN 1562-3599
Gamil, Y; Abdullah, M A; Abdul Rahman, I and Asad, M M (2020) Internet of things in construction industry revolution 4.0: Recent trends and challenges in the Malaysian context. Journal of Engineering, Design and Technology, 18(5), pp. 1091-1102. ISSN 1726-0531
Gan, V J L (2022) BIM-based building geometric modeling and automatic generative design for sustainable offsite construction. Journal of Construction Engineering and Management, 148(10): 04022111, ISSN 0733-9364
Ganesan, S; Lau, S S Y; Wong, K C and Chau, K W (2004) Growth of finance, insurance and real estate (FIRE) and office space absorption in Hong Kong. Journal of Financial Management of Property and Construction, 9(2), pp. 103-117. ISSN 1366-4387
Gangrade, R (2021) Quantifying spatial geotechnical uncertainty to advance the practice of risk assessment and decision-making for tunnel projects. PhD thesis, Colorado School of Mines, USA.
Ganguly, I (2008) Modeling alternatives and visualization of product adoption and usage in the residential construction industry. PhD thesis, University of Washington, USA.
Ganguly, K K; Padhy, R K and Rai, S S (2017) Managing the humanitarian supply chain: A fuzzy logic approach. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 521-536. ISSN 1759-5916
Gannon, E J (1998) A life-cycle cost model for use in the optimization of concrete bridge deck repair and rehabilitation. PhD thesis, Pennsylvania State University, USA.
Gao, J; Ren, H; Ma, X; Cai, W and Shi, Q (2019) A total energy efficiency evaluation framework based on embodied energy for the construction industry and the spatio-temporal evolution analysis. Engineering, Construction and Architectural Management, 26(8), pp. 1652-1671. ISSN 0969-9988
Gao, N and Touran, A (2020) Cost overruns and formal risk assessment program in US rail transit projects. Journal of Construction Engineering and Management, 146(5): 05020004, ISSN 0733-9364
Gao, Q; Liu, B; Sun, J; Liu, C and Xu, Y (2022) Trade decomposition of CO2 emissions of global construction industries. Engineering, Construction and Architectural Management, 29(1), pp. 502-522. ISSN 0969-9988
Gao, X and Pishdad-Bozorgi, P (2020) A framework of developing machine learning models for facility life-cycle cost analysis. Building Research & Information, 48(5), pp. 501-525. ISSN 0961-3218
Garba, A; Kishk, M and Moore, D R (2016) A comparative study of biomass energy technologies for sustainable electricity in Nigerian rural areas. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Garcia Punhagui, Katia Regina (2014) Potential reducing of CO2 emissions and embodied energy in housing construction in Brazil by increasing the use of wood. PhD thesis, Universidade de São Paulo, Brazil.
Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.
García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.
García de Soto, B; Adey, B T and Fernando, D (2017) A hybrid methodology to estimate construction material quantities at an early project phase. International Journal of Construction Management, 17(3), pp. 165-196. ISSN 1562-3599
Gardner, B J; Gransberg, D D and Jeong, H D (2016) Reducing data-collection efforts for conceptual cost estimating at a highway agency. Journal of Construction Engineering and Management, 142(11): 04016057, ISSN 0733-9364
Garg, S and Misra, S (2022) Understanding the components and magnitude of the cost of quality in building construction. Engineering, Construction and Architectural Management, 29(1), pp. 26-48. ISSN 0969-9988
Garg, S and Misra, S (2023) Framework for estimating quality-related incentive and disincentive in construction projects. Journal of Construction Engineering and Management, 149(5): 04023018, ISSN 0733-9364
Garmston H, F M and Pan W, d W P (2013) Multi-storey building retrofit with a focus on the façade selection process: A UK commercial office case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Garrett, C C (1991) Roadway infrastructure management and investment behavior studies for developing countries: A multicriteria approach to road improvement decision-making. PhD thesis, Ohio State University, USA.
Garvin, M J (2001) Strategic indicators for characterization of water system infrastructure and management. PhD thesis, Massachusetts Institute of Technology, USA.
Gashaw, T and Jilcha, K (2023) Design risk modeling and analysis for railway construction projects. International Journal of Construction Management, 23(14), pp. 2488-2498. ISSN 1562-3599
Gaspar, P L and De Brito, J (2008) Service life estimation of cement-rendered facades. Building Research & Information, 36(1), pp. 44-55. ISSN 0961-3218
Gasu, M B (2020) Residents' satisfaction with the use of green infrastructure in Osogbo, Osun State, Nigeria. African Journal of Built Environment Research, 4(1), pp. 1-19. ISSN 2414-0236
Gates, M and Scarpa, A (1984) Optimum penetration of friction piles. Journal of Construction Engineering and Management, 110(4), pp. 491-510. ISSN 0733-9364
Gautam, K P (2009) Life-cycle cost analysis of home-ownership. PhD thesis, University of Hawai'i at Manoa, USA.
Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X
Geekiyanage, D and Ramachandra, T (2021) Running costs indices for commercial buildings using the hedonic price imputation approach: A case of Sri Lanka. Construction Management and Economics, 39(8), pp. 704-721. ISSN 01446193
Geekiyanage, D; Ramachandra, T and Thurairajah, N (2018) A model for early stage estimation of operational expenses (opex) in commercial buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Genc, O (2023) Identifying principal risk factors in Turkish construction sector according to their probability of occurrences: A relative importance index (rii) and exploratory factor analysis (EFA) approach. International Journal of Construction Management, 23(6), pp. 979-987. ISSN 1562-3599
George, A; Aboagye-Nimo, E and Mamphey, S (2021) The effects of skills shortages on construction costs in the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(2), pp. 78-86. ISSN 17514304
George, K M (2019) Key performance indicators' effects on public sector infrastructure project efficiency in Grenada. DPA thesis, Walden University, USA.
Georgekutty, C K (2014) Optimization of construction cost in construction materials. Unpublished PhD thesis, Cochin University of Science and Technology, India.
Georgy, M E; Chang, L M and Zhang, L (2005) Prediction of engineering performance: A neurofuzzy approach. Journal of Construction Engineering and Management, 131(5), pp. 548-557. ISSN 0733-9364
Gessford, G N (1966) An investigation of the utility of critical path time and cost analysis as an aid to budgeting and administrative control by construction firms. PhD thesis, University of California, Los Angeles, USA.
Ghadamsi, A (2016) Investigating the influence of procurement method selection on project performance in Libya. PhD thesis, Brunel University, UK.
Ghadar, K O (2017) An examination of PERT implementation in the Libyan construction industry. PhD thesis, Cardiff Metropolitan University, UK.
Ghaeli, M R (1998) Pavement and bridge cost allocation analysis of the Intario intercity highway network. PhD thesis, University of Waterloo, USA.
Ghafoori, M and Abdallah, M (2022) Simulation-based optimization model to minimize equivalent annual cost of existing buildings. Journal of Construction Engineering and Management, 148(2): 04021202, ISSN 0733-9364
Ghahari, S (2021) Detecting and measuring corruption and inefficiency in infrastructure projects using machine learning and data analytics. PhD thesis, Purdue University, USA.
Ghanbaripour, Amir (2020) Improving the project delivery success of Australian construction project management practice. PhD thesis, Bond University, Australia.
Ghanbarpour, S; Mazaheripour, H; Mirmoradi, S H and Barari, A (2010) The effect of type and volume fraction (vf) of steel fiber on the mechanical properties of self-compacting concrete. Journal of Engineering, Design and Technology, 8(3), pp. 247-256. ISSN 1726-0531
Ghanem, A (2023) Integrated framework for multi-hazard resilience assessment of infrastructures. PhD thesis, University of Hawai'i at Manoa, USA.
Ghannoum, M; Assaad, J; Daaboul, M and El-Mir, A (2025) Deterministic and stochastic finite element modeling of reinforced concrete beams without stirrups containing plastic wastes. International Journal of Building Pathology and Adaptation, 43(4), pp. 614-632. ISSN 2398-4708
Gharaibeh, L; Eriksson, K and Lantz, B (2025) Quantifying BIM investment value: A systematic review. Journal of Engineering, Design and Technology, 23(5), pp. 1384-1403. ISSN 1726-0531
Gharaibeh, L.; Lantz, B. and Eriksson, K. M. (2026) Bridging the gap: A framework for monetizing BIM by integrating industry insights for informed decision-making. Smart and Sustainable Built Environment, 15(2), pp. 710-728. ISSN 2046-6099
Gharaibeh, H M (2013) Managing the cost of power transmission projects: Lessons learned. Journal of Construction Engineering and Management, 139(8), pp. 1063-1067. ISSN 0733-9364
Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.
Ghavidel, A (2025) AI-informed multi-threat decision-support methodology for long-term bridge asset management. PhD thesis, University of Texas at San Antonio, USA.
Ghazal, M M and Hammad, A (2022) Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects. International Journal of Construction Management, 22(9), pp. 1632-1646. ISSN 1562-3599
Gherbal, N E M (2015) The influence and evaluation of the project manager's performance in the Libyan construction industry. PhD thesis, Coventry University, UK.
Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.
Gholami Bavil Olyai, Farshid (2018) A framework for enhancing engineering deliverables to improve construction performance in oil and gas projects. PhD thesis, University of Calgary, Canada.
Gholizadeh, P (2022) Analyzing accidents among specialty contractors: A data mining approach. PhD thesis, George Mason University, USA.
Gholizadeh, P and Esmaeili, B (2020) Cost of occupational incidents for electrical contractors: Comparison using robust-factorial analysis of variance. Journal of Construction Engineering and Management, 146(7): 0001861, ISSN 0733-9364
Ghosh, S; Krishna, S R; Billton, J V; Srikanth, S A; Mohandas, S; Ashwin Ganesh, M and Shiv Kulin, C (2021) Countering tropical cyclonic storm impacts on low-rise houses. Smart and Sustainable Built Environment, 10(4), pp. 631-652. ISSN 2046-6099
Ghulman, B A (2000) Predicting construction cost growth in ODOT's paving projects using information available at the bidding time. PhD thesis, Oklahoma State University, USA.
Gillen, M E (1996) Nonfatal falls in construction workers: Predictors of injury severity. PhD thesis, University of California, San Francisco, USA.
Giti, D M; K'Akumu, O A and Ondieki, E O (2020) Enhanced role of private sector through public private partnerships in low income urban housing in Kenya. Journal of Financial Management of Property and Construction, 25(2), pp. 293-312. ISSN 1366-4387
Giustozzi, F (2012) Life cycle assessment of sustainable road pavements: Carbon footprinting and multi-attribute analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Gkountis, I and Zayed, T (2015) Subway infrastructure condition assessment. Journal of Construction Engineering and Management, 141(12): 04015042, ISSN 0733-9364
Gkritza, K (2006) Economic development effects of highway investment. PhD thesis, Purdue University, USA.
Gkritza, K and Labi, S (2008) Estimating cost discrepancies in highway contracts: Multistep econometric approach. Journal of Construction Engineering and Management, 134(12), pp. 953-962. ISSN 0733-9364
Glavan, J R (1988) Analysis of design-related problems from an industrial project. PhD thesis, University of Texas at Austin, USA.
Glew, D; Johnston, D; Miles-Shenton, D and Thomas, F (2020) Retrofitting suspended timber ground-floors; comparing aggregated and disaggregated evaluation methods. Building Research & Information, 48(5), pp. 572-586. ISSN 0961-3218
Godawatte, G A G R (2021) Understanding the cost overrun causation in construction megaprojects: a grounded systems thinking approach. PhD thesis, Heriot-Watt University, UK.
Godoy-Shimizu, D; Steadman, P and Evans, S (2021) Density and morphology: From the building scale to the city scale. Buildings & Cities, 2(1), pp. 92-113. ISSN 2632-6655
Goh, B H (2016) Designing a whole-life building cost index in Singapore. Built Environment Project and Asset Management, 6(2), pp. 159-173. ISSN 2044-124X
Goh, B H and Sun, Y (2016) The development of life-cycle costing for buildings. Building Research & Information, 44(3), pp. 319-333. ISSN 0961-3218
Goh, Y M (2005) A case-based reasoning approach to construction safety risk assessment. PhD thesis, National University of Singapore, Singapore.
Goh, Y M (2015) Empirical investigation of the average deployment force of personal fall-arrest energy absorbers. Journal of Construction Engineering and Management, 141(1): 04014059, ISSN 0733-9364
Golabchi, A; Han, S; Seo, J; Han, S; Lee, S and Al-Hussein, M (2015) An automated biomechanical simulation approach to ergonomic job analysis for workplace design. Journal of Construction Engineering and Management, 141(8): 04015020, ISSN 0733-9364
Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175
Golizadeh, H; Banihashemi, S; Sadeghifam, A N and Preece, C (2017) Automated estimation of completion time for dam projects. International Journal of Construction Management, 17(3), pp. 197-209. ISSN 1562-3599
Golparvar-Fard, M; Peña-Mora, F and Savarese, S (2011) Integrated sequential as-built and as-planned representation with D 4AR tools in support of decision-making tasks in the AEC/FM industry. Journal of Construction Engineering and Management, 137(12), pp. 1099-1116. ISSN 0733-9364
Gomez, C and Gambo, M (2016) Evaluation of special purpose vehicle organisation skill sets taxonomy for effective public-private partnership infrastructure project delivery. Journal of Construction in Developing Countries, 21(1), pp. 147-165. ISSN 1823-6499
Goncalves, Gustavo Henrique Vital (2022) Scenarios and support system for consortium management of construction waste applied to water resources management unit 12. PhD thesis, Universidade Federal de São Carlos, Brazil.
Goncalves, V L; Costanzo, V; Fabbri, K and Rakha, T (2022) Overheating assessment in Passivhaus dwellings: The influence of prediction tools. Buildings & Cities, 3(1), pp. 153-167. ISSN 2632-6655
Gong, X (2019) Vertical integration and reputation: the case of real estate companies. PhD thesis, University of Hong Kong, Hong Kong.
Gongming, M (2018) The influence of trust on risk allocation in Chinese PPP projects. PhD thesis, ISCTE - Instituto Universitario de Lisboa, Portugal.
González-Cruz, M C; Ballesteros-Pérez, P; Lucko, G and Zhang, J X (2022) Critical duration index: Anticipating project delays from deterministic schedule information. Journal of Construction Engineering and Management, 148(11): 04022121, ISSN 0733-9364
González-Prieto, D; Fernández-Nava, Y; Marañón, E and Prieto, M M (2021) Environmental life cycle assessment based on the retrofitting of a twentieth-century heritage building in Spain, with electricity decarbonization scenarios. Building Research & Information, 49(8), pp. 859-877. ISSN 0961-3218
Good, Tammy L (2023) Manager performance on public construction projects: A descriptive analysis study. DBA thesis, Keiser University (Florida), USA.
Goodman, R E (1998) Taxonomy of knowledge requirements for executives of general contracting and construction management enterprises. PhD thesis, Georgia Institute of Technology, USA.
Goodrum, P M and Dai, J (2005) Differences in occupational injuries, illnesses, and fatalities among Hispanic and non-Hispanic construction workers. Journal of Construction Engineering and Management, 131(9), pp. 1021-1028. ISSN 0733-9364
Goodrum, P M; Haas, C T; Caldas, C; Zhai, D; Yeiser, J and Homm, D (2011) Model to predict the impact of a technology on construction productivity. Journal of Construction Engineering and Management, 137(9), pp. 678-688. ISSN 0733-9364
Goodrum, P M; Haas, C T and Glover, R W (2002) The divergence in aggregate and activity estimates of US construction productivity. Construction Management and Economics, 20(5), pp. 415-423. ISSN 01446193
Gorse, C; Stafford, A; Shenton, D M; Johnston, D; Sutton, R and Farmer, D (2012) Thermal performance of buildings and the management process. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Gosling, J; Pero, M; Schoenwitz, M; Towill, D and Cigolini, R (2016) Defining and categorizing modules in building projects: An international perspective. Journal of Construction Engineering and Management, 142(11): 04016062, ISSN 0733-9364
Goswami, M; Singh, J and Kumar, V (2016) An enterprise based decision support system for engineering aggregate selection: A case study. Journal of Engineering, Design and Technology, 14(4), pp. 851-873.
Goto, Y (2012) Sustainable wooden building concept for central Japan. DSc thesis, ETH Zürich, Switzerland.
Gouda Mohamed, A; Helmy Ammar, M and Nabawy, M (2023) Risks assessment using structural equation modeling: Mega housing projects construction in Egypt. International Journal of Construction Management, 23(16), pp. 2717-2728. ISSN 1562-3599
Govan, P B (2014) Causal network methods for integrated project portfolio risk analysis. PhD thesis, Texas A&M University, USA.
Govertsen, K and Kane, M (2024) Measuring health inequities due to housing characteristics. Buildings & Cities, 5(1), pp. 451-469. ISSN 2632-6655
Gowthaman, M; Gamage, I and Karunaratne, T (2025) Framework for managing deficiencies and inefficiencies in quantity surveying-related software implementation. Construction Economics and Building, 25(2), pp. 192-214. ISSN 2204-9029
Goyal, P K; Datta, T K and Vijay, V K (2012) Vulnerability of rural houses to cyclonic wind. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 20-41. ISSN 1759-5916
Graham, D; Smith, S D and Crapper, M (2006) Refining the case-based reasoning model of construction processes. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.
Graham, L D and Smith, S D (2003) A hybrid model to improve the estimation of concreting operations. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Grahn, Karin (2023) Occupational exposure to particles in relation to chronic obstructive pulmonary disease and cardiovascular disease. PhD thesis, Karolinska Institutet, Sweden.
Gransberg, D D (2004) Life cycle evaluation criteria for design-build highway pavement projects. PhD thesis, University of Colorado at Boulder, USA.
Gransberg, D D; Lopez Del Puerto, C and Humphrey, D (2007) Relating cost growth from the initial estimate to design fee for transportation projects. Journal of Construction Engineering and Management, 133(6), pp. 404-408. ISSN 0733-9364
Gransberg, D D and Riemer, C (2009) Impact of inaccurate engineer's estimated quantities on unit price contracts. Journal of Construction Engineering and Management, 135(11), pp. 1138-1145. ISSN 0733-9364
Grau, D and Back, W E (2015) Predictability index: Novel metric to assess cost and schedule performance. Journal of Construction Engineering and Management, 141(12): 04015043, ISSN 0733-9364
Grau Torrent, D (2008) Development of a methodology for automating the identification and localization of engineered components and assessment of its impact on construction craft productivity. PhD thesis, University of Texas at Austin, USA.
Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193
Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), pp. 121-144. ISSN 01446193
Green, M F (1975) The application of probabilistic methods to building design. PhD thesis, University of Surrey, UK.
Green, S D (1989) Tendering: Optimization and rationality. Construction Management and Economics, 7(1), pp. 53-63. ISSN 01446193
Greenwood, D J; Osborne, A N and Aggiag, M A (2001) A comparative analysis of administrative delays in hospital buildings. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Greer, Fiona Muriel (2021) Life-cycle environmental and economic management of airport infrastructure and operations. PhD thesis, University of California, USA.
Gregori, T and Pietroforte, R (2015) An input-output analysis of the construction sector in emerging markets. Construction Management and Economics, 33(2), pp. 134-145. ISSN 01446193
Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.
Griffin, M G (2008) The lived experience of first line managers during planned organizational change: A phenomenological study of one firm in the residential construction industry. EdD thesis, George Washington University, USA.
Griffis, F H (1992) Bidding strategy: Winning overkey competitors. Journal of Construction Engineering and Management, 118(1), pp. 151-165. ISSN 0733-9364
Grimes, G A (2004) Recovering capital expenditures: The railroad industry paradox. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.
Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Gruneberg, S (2008) Modelling the UK built infrastructure market using gross fixed capital formation. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Gruneberg, S and Folwell, K (2013) The use of gross fixed capital formation as a measure of construction output. Construction Management and Economics, 31(4), pp. 359-368. ISSN 1466433X
Gruneberg, S and Hughes, W P (2004) Construction consortia: Do they serve any real purpose? In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Gschösser, F (2011) Environmental assessment of road constructions: Life cycle assessment of Swiss road pavements and an accompanying analysis of construction and maintenance costs. DSc thesis, ETH Zürich, Switzerland.
Guerra, Beatriz Chinelato (2021) BIM-based construction waste management and circular economy for resource recovery. PhD thesis, University of Texas at Austin, USA.
Guevara, J; Herrera, L and Salazar, J (2022) Interorganizational sponsor networks in road and social infrastructure PPP equity markets. Journal of Construction Engineering and Management, 148(4): 04022009, ISSN 0733-9364
Gunawardena, K and Steemers, K (2023) Assessing the influence of neighbourhood-scale vertical greening application. Buildings & Cities, 4(1), pp. 103-123. ISSN 2632-6655
Gundes, S (2011) Input structure of the construction industry: A cross-country analysis, 1968-90. Construction Management and Economics, 29(6), pp. 613-621. ISSN 1466433X
Gunduz, M; Abumoza, A M and Aly, A A (2023) A structural equation model to assess the effects of strategic and project related potential risks on project delivery in qatar. Engineering, Construction and Architectural Management, 30(10), pp. 4782-4820. ISSN 0969-9988
Gunduz, M and Elsherbeny, H A (2020) Operational framework for managing construction-contract administration practitioners' perspective through modified Delphi method. Journal of Construction Engineering and Management, 146(3): 04019110, ISSN 0733-9364
Gunhan, S M (2003) Foreign market entry decision model for construction companies. PhD thesis, Illinois Institute of Technology, USA.
Gunner, J and Skitmore, M (1999) Comparative analysis of pre-bid forecasting of building prices based on Singapore data. Construction Management and Economics, 17(5), pp. 635-646. ISSN 01446193
Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Guo, K (2006) Risk of pavement warranties to contractors. PhD thesis, University of Florida, USA.
Guo, Q; Amin, S; Wang, H and Yan, H (2024) Coupling simulation of human-environmental safety risk factors in metro construction: A case study of Rongjiazhai Station at xi’an Metro Line 5 in China. International Journal of Construction Education and Research, 20(1), pp. 26-42. ISSN 15578771
Guo, Q L (2001) Development of risk analysis models for decision-making in project management. PhD thesis, Edinburgh Napier University, UK.
Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.
Gurmu, A. (2026) Forecasting building cost index with vecm: Integrating output-based indexes and macroeconomic indicators. Journal of Engineering, Design and Technology, 24(4), pp. 1012-1036. ISSN 1726-0531
Gurmu, A T (2026) Econometric analysis of macroeconomic factors influencing construction labour productivity at industry level: Evidence from Australia. Construction Management and Economics, 44(1), pp. 23-40. ISSN 0144-6193
Gurmu, A; Hosseini, M R; Arashpour, M and Lioeng, W (2025) Development of building defects dashboards and stochastic models for multi-storey buildings in Victoria, Australia. Construction Innovation, 25(2), pp. 594-619. ISSN 1471-4175
Gurmu, A; Kamardeen, I and Mahmood, M N (2023) Blended pedagogical model for effective teaching of building measurement and estimating. International Journal of Construction Management, 23(7), pp. 1138-1147. ISSN 1562-3599
Gurmu, A and Miri, M P (2025) Machine learning regression for estimating the cost range of building projects. Construction Innovation, 25(2), pp. 577-593. ISSN 1471-4175
Gurmu, A T and Ongkowijoyo, C S (2020) Predicting construction labor productivity based on implementation levels of human resource management practices. Journal of Construction Engineering and Management, 146(3): 04019115, ISSN 0733-9364
Gurmu, A T and Ongkowijoyo, C S (2020) Stochastic-based model for setting formwork-productivity baseline. Journal of Construction Engineering and Management, 146(9): 04020099, ISSN 0733-9364
Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.
Gurung, N and Mahendran, M (2002) Comparative life cycle costs for new steel portal frame building systems. Building Research & Information, 30(1), pp. 35-46. ISSN 0961-3218
Guven, H and Tanik, A (2020) Water-energy nexus: Sustainable water management and energy recovery from wastewater in eco-cities. Smart and Sustainable Built Environment, 9(1), pp. 54-70. ISSN 2046-6099
Guzman de la Cruz, A L (1998) Cost-performance criteria for seismic retrofitting. PhD thesis, University of Puerto Rico, Mayaguez, Puerto Roco.
Gyadu-Asiedu, W (2009) Assessing construction project performance in Ghana: modelling practitioners' and clients perspectives. PhD thesis, Eindhoven University of Technology, Netherlands.
Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.
Gómez-Cabrera, A; Gutierrez-Bucheli, L and Muñoz, S (2024) Causes of time and cost overruns in construction projects: A scoping review. International Journal of Construction Management, 24(10), pp. 1107-1125. ISSN 1562-3599
Gómez-Chaparro, M; García-Sanz-Calcedo, J and Aunión-Villa, J (2020) Maintenance in hospitals with less than 200 beds: Efficiency indicators. Building Research & Information, 48(5), pp. 526-537. ISSN 0961-3218
Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364
Habermann, N and Hedel, R (2018) Damage functions for transport infrastructure. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 420-434. ISSN 1759-5916
Habibi, S (2019) Design concepts for the integration of bamboo in contemporary vernacular architecture. Architectural Engineering and Design Management, 15(6), pp. 475-489. ISSN 1745-2007
Habisreutinger, P and Gunderson, D E (2006) Real estate reuse opportunities within the regenesis project area: A case study. International Journal of Construction Education and Research, 2(1), pp. 53-63. ISSN 1557-8771
Hackett, J A (2011) The role of cost estimators in UK construction: a case for, and steps towards, an estimating profession. PhD thesis, University of Birmingham, UK.
Hackett, J A and Hicks, C M (2007) Estimating as a profession in UK construction. Engineering, Construction and Architectural Management, 14(1), pp. 26-51. ISSN 0969-9988
Haddad, S; Osmond, P and King, S (2019) Application of adaptive thermal comfort methods for Iranian schoolchildren. Building Research & Information, 47(2), pp. 173-189. ISSN 0961-3218
Hagan, G; Bower, D and Smith, N (2011) Managing complex projects in multi-project environments. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Hagan, G N (2013) Managing complex construction projects in it multiproject environment by the contractor. PhD thesis, University of Leeds, UK.
Haidar, A (2011) Analysis and optimization of megaproject performance. PhD thesis, University of Florida, USA.
Haik, R; Peled, A and Meir, I A (2021) Thermal performance of alternative binders lime hemp concrete (lhc) building: Comparison with conventional building materials. Building Research & Information, 49(7), pp. 763-776. ISSN 0961-3218
Hailemariam, E K; Hailemariam, L M; Amede, E A and Nuramo, D A (2023) Identification of barriers, benefits and opportunities of using bamboo materials for structural purposes. Engineering, Construction and Architectural Management, 30(7), pp. 2716-2738. ISSN 0969-9988
Haj Kazem Kashani, H (2012) A real options model for the financial valuation of infrastructure systems under uncertainty. PhD thesis, Georgia Institute of Technology, USA.
Hajarolasvadi, H and Shahhosseini, V (2022) A system-dynamic model for evaluating the effect of person-team fit on project performance. Journal of Construction Engineering and Management, 148(11): 04022126, ISSN 0733-9364
Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.
Hajikazemi, S; Aaltonen, K; Ahola, T; Aarseth, W and Andersen, B (2020) Normalising deviance in construction project organizations: A case study on the collapse of Carillion. Construction Management and Economics, 38(12), pp. 1122-1138. ISSN 01446193
Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.
Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099
Hale, D R; Shrestha, P P; Gibson, G E and Migliaccio, G C (2009) Empirical comparison of design/build and design/bid/build project delivery methods. Journal of Construction Engineering and Management, 135(7), pp. 579-587. ISSN 0733-9364
Halim, M S A; Jaafar, M; Osman, O and Shariff Haniff, M (2012) Financial ratio analysis: An assessment of Malaysian contracting firms. Journal of Construction in Developing Countries, 17(S1), pp. 71-78. ISSN 1823-6499
Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007
Haller, M and Stehn, L (2010) Standardizing the pre-design-phase for improved efficiency in off-site housing projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Halliday, S; Beggs, C and Muneer, T (1999) Is solar air conditioning feasible? Building Research & Information, 27(3), pp. 149-164. ISSN 0961-3218
Halligan, D W; Hester, W T and Thomas, H R (1987) Managing unforeseen site conditions. Journal of Construction Engineering and Management, 113(2), pp. 273-287. ISSN 0733-9364
Ham, N; Moon, S; Kim, J H and Kim, J J (2018) Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project. Journal of Construction Engineering and Management, 144(6): 05018006, ISSN 0733-9364
Ham, Y (2015) Vision-based building energy diagnostics and retrofit analysis using 3D thermography and building information modeling. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hamed, O (2022) Developing a BIM-based tool to automate green buildings assessment: the case of Jordan Green Building Guide. PhD thesis, University of Sheffield, UK.
Hamida, A; Alsudairi, A; Alshaibani, K and Alshamrani, O (2021) Environmental impacts cost assessment model of residential building using an artificial neural network. Engineering, Construction and Architectural Management, 28(10), pp. 3190-3215. ISSN 0969-9988
Hamide, M (2017) Schedule and cost performance analysis and prediction in Louisiana DOTD. PhD thesis, University of New Orleans, USA.
Hammad, A W A; Akbarnezhad, A; Rey, D and Waller, S T (2016) A computational method for estimating travel frequencies in site layout planning. Journal of Construction Engineering and Management, 142(5): 04015102, ISSN 0733-9364
Hammad, M W; Abbasi, A and Ryan, M J (2018) Developing a novel framework to manage schedule contingency using theory of constraints and earned schedule method. Journal of Construction Engineering and Management, 144(4): 04018011, ISSN 0733-9364
Hammad, Mohammed (2018) Estimating, allocating and managing schedule and cost contingency in construction projects. PhD thesis, University of New South Wales, Australia.
Hamouda, H and Abu-Shaaban, N (2014) Enhancing labour productivity within construction industry through analytical hierarchy process, the case of Gaza Strip. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Hampton, G; Baldwin, A N and Holt, G D (2012) Project delays and cost: Stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), pp. 73-91. ISSN 1366-4387
Hamza, M; Shahid, S; Bin Hainin, M R and Nashwan, M S (2022) Construction labour productivity: Review of factors identified. International Journal of Construction Management, 22(3), pp. 413-425. ISSN 1562-3599
Hamzeh, F R; Faek, F and AlHussein, H (2019) Understanding improvisation in construction through antecedents, behaviours and consequences. Construction Management and Economics, 37(2), pp. 61-71. ISSN 01446193
Han, J; Gu, F and Wu, G (2023) Managing cooperation in multipartner project teams with heterogeneous team members. Journal of Construction Engineering and Management, 149(10): 04023101, ISSN 0733-9364
Han, J; Kim, J; Kim, S and Wang, S (2024) Effectiveness of image augmentation techniques on detection of building characteristics from street view images using deep learning. Journal of Construction Engineering and Management, 150(10): 04024129, ISSN 0733-9364
Han, K; Degol, J and Golparvar-Fard, M (2018) Geometry- and appearance-based reasoning of construction progress monitoring. Journal of Construction Engineering and Management, 144(2): 04017110, ISSN 0733-9364
Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. PhD thesis, Purdue University, USA.
Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364
Han, Y; Yin, Z; Liu, J; Jin, R; Gidado, K; Painting, N; Yang, Y and Yan, L (2019) Defining and testing a safety cognition framework incorporating safety hazard perception. Journal of Construction Engineering and Management, 145(12): 04019081, ISSN 0733-9364
Hancher, D E; De La Garza, J M and Eckert, G K (1997) Improving workers' compensation management in construction. Journal of Construction Engineering and Management, 123(3), pp. 285-291. ISSN 0733-9364
Handa, V K and Abdalla, O (1989) Forecasting productivity by work sampling. Construction Management and Economics, 7(1), pp. 19-28. ISSN 01446193
Hanggara, D and Wijeyewickrema, A C (2020) Vulnerability assessment of reinforced concrete buildings in Indonesia subjected to tsunami inundation forces. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 204-218. ISSN 1759-5916
Hanid, M (2014) Design science research as an approach to develop conceptual solutions for improving cost management in construction. PhD thesis, University of Salford, UK.
Hanif, H; Khurshid, M B; Lindhard, S M and Aslam, Z (2016) Impact of variation orders on time and cost in mega hydropower projects of Pakistan. Journal of Construction in Developing Countries, 21(2), pp. 37-53. ISSN 1823-6499
Hanna, A; Boodai, F and El Asmar, M (2013) State of practice of building information modeling in mechanical and electrical construction industries. Journal of Construction Engineering and Management, 139(10): 04013009, ISSN 0733-9364
Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364
Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364
Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364
Hanna, A S; Russell, J S; Gotzion, T W and Nordheim, E V (1999) Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3), pp. 176-184. ISSN 0733-9364
Hanna, A S; Russell, J S; Nordheim, E V and Bruggink, M J (1999) Impact of change orders on labor efficiency for electrical construction. Journal of Construction Engineering and Management, 125(4), pp. 224-232. ISSN 0733-9364
Hanna, A S; Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(6), pp. 721-730. ISSN 01446193
Hanna, B A (1988) Role expectations of superintendents and architects in the state of Kansas relative to experience in school construction. EdD thesis, University of Kansas, USA.
Hao, J X (2007) Infrastructure investment and economic development. PhD thesis, University of Maryland, College Park, USA.
Haraguchi, M and Kim, S (2016) Critical infrastructure interdependence in New York city during hurricane sandy. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 133-143. ISSN 1759-5916
Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Harkin, F and Gunning, J G (1999) Evaluating quality in construction. Journal of Financial Management of Property and Construction, 4(3), pp. 65-80. ISSN 1366-4387
Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364
Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.
Hartmann, A and Hietbrink, M (2013) An exploratory study on the relationship between stakeholder expectations, experiences and satisfaction in road maintenance. Construction Management and Economics, 31(4), pp. 345-358. ISSN 1466433X
Harun, Z B (1993) Computer simulation in decision support systems for management of construction projects. PhD thesis, University of Leeds, UK.
Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988
Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364
Hashemi, H; Mousavi, S M and Mojtahedi, S M H (2011) Bootstrap technique for risk analysis with interval numbers in bridge construction projects. Journal of Construction Engineering and Management, 137(8), pp. 600-608. ISSN 0733-9364
Hassan, F U; Le, T and Lv, X (2021) Addressing legal and contractual matters in construction using natural language processing: A critical review. Journal of Construction Engineering and Management, 147(9): 03121004, ISSN 0733-9364
Hassan, M E M (2017) Modeling the macroeconomic impact of construction spending as a public policy tool - the case of employment. PhD thesis, Purdue University, USA.
Hassan, O A B and Anderstedt, R (2017) Estimation of drying time of fresh concrete slabs: A comparative study. Journal of Engineering, Design and Technology, 15(2), pp. 134-148.
Hassan, O A B and Johansson, C (2018) Glued laminated timber and steel beams: A comparative study of structural design, economic and environmental consequences. Journal of Engineering, Design and Technology, 16(3), pp. 398-417. ISSN 1726-0531
Hassanein, A A G and Khalil, B N L (2006) Building Egypt 1: a general indicator cost index for the Egyptian construction industry. Engineering, Construction and Architectural Management, 13(5), pp. 463-480. ISSN 0969-9988
Hassanein, A A G and Khalil, B N L (2006) Developing general indicator cost indices for the Egyptian construction industry. Journal of Financial Management of Property and Construction, 11(3), pp. 181-194. ISSN 1366-4387
Hassanein, A A G and el Nemr, W (2007) Management of change order claims in the Egyptian industrial construction sector. Journal of Financial Management of Property and Construction, 12(1), pp. 45-60. ISSN 1366-4387
Hassim, S; Kadir, M R A; Lew, Y L and Sim, Y C (2003) Estimation of minimum working capital for construction projects in Malaysia. Journal of Construction Engineering and Management, 129(4), pp. 369-374. ISSN 0733-9364
Hassim, S; Muniandy, R; Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia: Modeling using fuzzy neural network. Engineering, Construction and Architectural Management, 25(3), pp. 443-457. ISSN 0969-9988
Hastak, M (1994) Decision support system for project cost control strategy and planning. PhD thesis, Purdue University, USA.
Hastak, M; Halpin, D W and Vanegas, J (1996) COMPASS: new paradigm for project cost control strategy and planning. Journal of Construction Engineering and Management, 122(3), pp. 254-264. ISSN 0733-9364
Hatami, N and Rashidi, A (2025) Enhancing the adoption of building information modeling in the Iranian AEC sector: Insights from a Delphi study. Engineering, Construction and Architectural Management, 32(2), pp. 847-869. ISSN 0969-9988
Hatamleh, M T; Hiyassat, M; Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(1), pp. 113-131. ISSN 0969-9988
Hauck, A J (1990) Development and evaluation of computerized construction estimating, pricing, and bidding programs using integrated applications software. PhD thesis, University of Maryland, College Park, USA.
Haupt, T C and Pillay, K (2016) Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14(2), pp. 373-419.
He, S; Li, J; Li, M and Antwi-Afari, M F (2026) Modeling and analyzing workers' hazard perception in construction equipment operations: A hierarchical Bayesian cognitive modeling approach integrating multisource data. Journal of Construction Engineering and Management, 152(5): 04026054, ISSN 0733-9364
He, C (2018) Public procurement: award mechanisms and implementation process. PhD thesis, Loughborough University, UK.
He, N (2016) Conceptual cost modeling of innovative industrial estates using sysml and case-based reasoning. PhD thesis, National University of Singapore, Singapore.
He, P; Qin, L; Yuan, Y and Yuan, J (2025) Action reliability assessment framework for automated construction labor measurements: Case study on plastering operations. Journal of Construction Engineering and Management, 151(8): 05025006, ISSN 0733-9364
He, S (2018) A project-level infrastructure management framework for sustainable roadways. PhD thesis, Syracuse University, USA.
He, W (1997) Pavement project optimization and analysis. PhD thesis, Arizona State University, USA.
He, X; Liu, R and Anumba, C J (2021) Data-driven insights on the knowledge gaps of conceptual cost estimation modeling. Journal of Construction Engineering and Management, 147(2): 04020165, ISSN 0733-9364
He, Y (2006) Earthquake loss and risk estimation of buildings by Monte Carlo simulation. PhD thesis, Columbia University, USA.
He, Y; Shi, L and Li, Z (2021) The combined effect of marginal social and private benefit on the socially optimal equity structure of PPP projects. Construction Management and Economics, 39(10), pp. 807-823. ISSN 01446193
Heaton, R; Martin, H; Chadee, A; Milling, A; Dunne, S and Borthwick, F (2022) The construction materials conundrum: Practical solutions to address integrated supply chain complexities. Journal of Construction Engineering and Management, 148(8): 04022071, ISSN 0733-9364
Hegab, M and Smith, G R (2009) Labor performance analysis for microtunneling projects. Journal of Construction Engineering and Management, 135(5), pp. 432-435. ISSN 0733-9364
Hegab, M; Smith, G R and Salem, O M (2006) Soil penetration modeling in microtunneling projects. Journal of Construction Engineering and Management, 132(6), pp. 598-605. ISSN 0733-9364
Hegab, M Y and Smith, G R (2007) Delay time analysis in microtunneling projects. Journal of Construction Engineering and Management, 133(2), pp. 191-195. ISSN 0733-9364
Hegazy, T; Abdel-Monem, M; Saad, D A and Rashedi, R (2013) Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139(9), pp. 1135-1143. ISSN 0733-9364
Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364
Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364
Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions: I: Subcontractor information system. Journal of Construction Engineering and Management, 127(6), pp. 461-468. ISSN 0733-9364
Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364
Hegazy, T and Moselhi, O (1994) Estimator: A prototype of an integrated bid preparation system. Engineering, Construction and Architectural Management, 1(1), pp. 51-67. ISSN 0969-9988
Hegazy, T and Petzold, K (2003) Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129(4), pp. 396-404. ISSN 0733-9364
Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364
Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.
Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364
Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364
Hellas, M S; Chaib, R and Verzea, I (2020) Artificial intelligence treating the problem of uncertainty in quantitative risk analysis (QRA). Journal of Engineering, Design and Technology, 18(1), pp. 40-54. ISSN 1726-0531
Hendrickson, C and Horvath, A (2000) Resource use and environmental emissions of U.S. Construction sectors. Journal of Construction Engineering and Management, 126(1), pp. 38-44. ISSN 0733-9364
Hendrickson, C; Martinelli, D and Rehak, D (1987) Hierarchical rule-based activity duration estimation. Journal of Construction Engineering and Management, 113(2), pp. 288-301. ISSN 0733-9364
Henjewele, C; Sun, M and Fewings, P (2008) Uncertainties and the challenge of long-term value for money in the delivery of PFI projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Henjewele, C; Sun, M and Fewings, P (2012) Analysis of factors affecting value for money in UK PFI projects. Journal of Financial Management of Property and Construction, 17(1), pp. 9-28. ISSN 1366-4387
Henry, E and Brothers, H S (2001) Cost analysis between SABER and design bid build contracting methods. Journal of Construction Engineering and Management, 127(5), pp. 359-366. ISSN 0733-9364
Heravi, G and Mohammadian, M (2021) Investigating cost overruns and delay in urban construction projects in Iran. International Journal of Construction Management, 21(9), pp. 958-968. ISSN 1562-3599
Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X
Herbsman, Z (1986) SERC: A model for estimating construction inputs. Journal of Construction Engineering and Management, 112(3), pp. 425-439. ISSN 0733-9364
Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193
Herbsman, Z and Mitrani, J D (1984) INES: An interactive estimating system. Journal of Construction Engineering and Management, 110(1), pp. 19-33. ISSN 0733-9364
Herbsman, Z J; Chen, W T and Epstein, W C (1995) Time is money: Innovative contracting methods in highway construction. Journal of Construction Engineering and Management, 121(3), pp. 273-281. ISSN 0733-9364
Hernandez, W (2017) Development of a sustainable quality assurance program for transporation infrastructure. PhD thesis, University of Rhode Island, USA.
Hernández, J M A (2024) Essays on public policy evaluation: The case of spain's supplier payment plan. PhD thesis, University of Exeter, UK.
Herrera, C and Lemus, L (2025) The "invasion of women"? Challenges to gender norms and relations with women's increasing presence in the Mexican construction industry. Construction Management and Economics, 43(9), pp. 723-745. ISSN 0144-6193
Herrera-Pérez, V.; Rubio-Romero, J. C.; Fuertes, A.; Salguero-Caparrós, F. and del Carmen Pardo-Ferreira, M. (2026) Investigating the impact of medication consumption on crane-related occupational health and safety risks in construction projects. Journal of Construction Engineering and Management, 152(8): 04026116, ISSN 0733-9364
Herzog, H W and Schlottmann, A M (1988) Local business cycle severity and induced labour mobility: The case of the construction workforce. Construction Management and Economics, 6(3), pp. 247-258. ISSN 01446193
Heshmati, K; Shahabpoor, E; Walker, I; Ghanbari, S and Darby, A (2025) The effect of wind-induced vibrations in tall buildings on occupants' work performance. Building Research & Information, 53(8), pp. 949-964. ISSN 0961-3218
Hewavitharana, S; Perera, A; Perera, S; Perera, P and Nanayakkara, S (2025) Framework for systematic adoption of ERP systems in the Sri Lankan construction industry. Built Environment Project and Asset Management, 15(3), pp. 629-646. ISSN 2044-124X
Hicks, J C (1992) Heavy construction estimates, with and without computers. Journal of Construction Engineering and Management, 118(3), pp. 545-560. ISSN 0733-9364
Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.
Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Hildreth, J C (2020) Effect of period length on forecasting maintenance and repair costs for heavy equipment by the period cost based methodology. International Journal of Construction Education and Research, 16(3), pp. 167-179. ISSN 1557-8771
Hindmarch, H; Gale, A W and Harrison, R E (2010) A proposed construction design change management tool to aid in making informed design decisions. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Hinkel, M P (2022) Three essays on labor market regulation in the American construction industry. PhD thesis, Michigan State University, USA.
Hinze, J W (1976) The effect of middle management on safety in construction. PhD thesis, Stanford University, USA.
Hiyassat, M A; Alkasagi, F; El-Mashaleh, M and Sweis, G J (2022) Risk allocation in public construction projects: The case of Jordan. International Journal of Construction Management, 22(8), pp. 1478-1488. ISSN 1562-3599
Hiyassat, M A; Hiyari, M A and Sweis, G J (2016) Factors affecting construction labour productivity: A case study of Jordan. International Journal of Construction Management, 16(2), pp. 138-149. ISSN 1562-3599
Hlaing, N N; Singh, D; Tiong, R L K and Ehrlich, M (2008) Perceptions of Singapore construction contractors on construction risk identification. Journal of Financial Management of Property and Construction, 13(2), pp. 85-95. ISSN 1366-4387
Ho, K H; Hui, E C M and Su, H (2010) Examining fuzzy tactical asset allocation (FTAA) as an alternative to modern portfolio theory (MPT) asset allocation for international and direct real estate investment. Journal of Financial Management of Property and Construction, 15(1), pp. 71-94. ISSN 1366-4387
Ho, P (2012) Comparison of the grey model and the box jenkins model in forecasting manpower in the UK construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ho, P H K (2013) Forecasting the manpower demand for quantity surveyors in Hong Kong. Construction Economics and Building, 13(3), pp. 1-12. ISSN 2204-9029
Ho, S P and Liu, L Y (2003) How to evaluate and invest in emerging A/E/C technologies under uncertainty. Journal of Construction Engineering and Management, 129(1), pp. 16-24. ISSN 0733-9364
Hoare, D and Broome, J (2001) Bills of quantities versus activity schedules for civil engineering projects. Journal of Construction Procurement, 7(1), pp. 11-26. ISSN 1358-9180
Hoezen, Mieke (2012) The competitive dialogue procedure: Negotiations and commitment in inter-organisational construction projects. PhD thesis, University of Twente, Netherlands.
Hogan, D B (1998) Modeling construction cost performance: A comprehensive approach using statistical, artificial neural network and simulation methods. PhD thesis, Columbia University, USA.
Hogg, K (2003) The role of the quantity surveying profession in accommodating client risk. Journal of Financial Management of Property and Construction, 8(1), pp. 49-56. ISSN 1366-4387
Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.
Hollar, D A; Rasdorf, W; Liu, M; Hummer, J E; Arocho, I and Hsiang, S M (2013) Preliminary engineering cost estimation model for bridge projects. Journal of Construction Engineering and Management, 139(9), pp. 1259-1267. ISSN 0733-9364
Hollick, F; Humphrey, D; Oreszczyn, T; Elwell, C and Huebner, G (2024) Building energy use in COVID-19 lockdowns: Did much change? Buildings & Cities, 5(1), pp. 182-198. ISSN 2632-6655
Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.
Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364
Hong, X (2002) A comparative study of contractor performance based on Japanese, UK and US construction practice. PhD thesis, University of Wolverhampton, UK.
Hong, Y; Tian, Z and Sun, X (2020) Dynamic evaluation for compaction quality of roller compacted concrete based on reliability metrics. Journal of Construction Engineering and Management, 146(10): 04020123, ISSN 0733-9364
Hong, Y; Xie, H; Agapaki, E and Brilakis, I (2023) Graph-based automated construction scheduling without the use of BIM. Journal of Construction Engineering and Management, 149(2): 05022020, ISSN 0733-9364
Hooshangi, N; Mahdizadeh Gharakhanlou, N and Ghaffari-Razin, S R (2024) Urban search and rescue (USAR) simulation in earthquake environments using queuing theory: estimating the appropriate number of rescue teams. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 1-18. ISSN 1759-5916
Hopkins, O S (2004) Planning rural water supply systems in developing countries: The case of Rwanda. PhD thesis, University of North Carolina at Chapel Hill, USA.
Hoque, M I; Safayet, M A; Rana, M J; Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(2), pp. 401-421. ISSN 23984708
Horner, M and Zakieh, R (1996) Characteristic items: a new approach to pricing and controlling construction projects. Construction Management and Economics, 14(3), pp. 241-252. ISSN 01446193
Horvath, A (1997) Estimation of environmental implications of construction materials and designs using life cycle assessment techniques. PhD thesis, Carnegie Mellon University, USA.
Hoseini, E; Bosch-Rekveldt, M and Hertogh, M (2020) Cost contingency and cost evolvement of construction projects in the preconstruction phase. Journal of Construction Engineering and Management, 146(6): 05020006, ISSN 0733-9364
Hosny, F.; El-Damaty, M.; Mantha, B. R. K. and Abu Dabous, S. (2026) Analysis and modeling of delays during construction handover stage for building projects: A case study of United Arab Emirates. International Journal of Building Pathology and Adaptation, 44(3), pp. 658-684. ISSN 2398-4708
Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.
Hosseinian, S M; Farahpour, E and Carmichael, D G (2021) An optimum multiple outcomes sharing model with multiple risk-averse agents. Engineering, Construction and Architectural Management, 28(9), pp. 2788-2810. ISSN 0969-9988
Hosseinian, S M and Jaberi, A (2025) Optimizing the distribution of outcomes across multiple levels of subcontracting in construction projects. Engineering, Construction and Architectural Management, 32(2), pp. 1278-1302. ISSN 0969-9988
Hosseinian, Seyedmahdi (2013) Optimal outcome sharing arrangements in construction target contracts. PhD thesis, University of New South Wales, Australia.
Hou, H (2023) Understanding building and urban environment interactions: an integrated framework for building occupancy modelling. PhD thesis, Imperial College London, UK.
Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases. PhD thesis, Brunel University, UK.
Howes, R (2000) Improving the performance of earned value analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(4), pp. 399-411. ISSN 0969-9988
Hoxha, E; Passer, A; Saade, M R M; Trigaux, D; Shuttleworth, A; Pittau, F; Allacker, K and Habert, G (2020) Biogenic carbon in buildings: A critical overview of LCA methods. Buildings & Cities, 1(1), pp. 504-524. ISSN 2632-6655
Hsieh, H H Y (2005) The 1990s Taiwan residential construction boom: A supply side interpretation. Construction Management and Economics, 23(3), pp. 265-284. ISSN 01446193
Hsu, P Y; Aurisicchio, M; Angeloudis, P and Whyte, J (2020) Understanding and visualizing schedule deviations in construction projects using fault tree analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2501-2522. ISSN 0969-9988
Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.
Hu, K (2011) Three essays on modeling complex dynamic problems in health and safety. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Hu, M (2022) Influence of project design team characteristics on construction cost of sustainable buildings. PhD thesis, University of Maryland, College Park, USA.
Hu, M and Milner, D (2021) Factors influencing existing medium-sized commercial building energy retrofits to achieve the net zero energy goal in the United States. Building Research & Information, 49(5), pp. 525-542. ISSN 0961-3218
Hu, M; Nippala, E; Kallioharju, K and Pelsmakers, S (2022) Monte Carlo simulation approach to understand the cost variance for energy retrofit projects: Comparative study of Finland and the United States. Construction Management and Economics, 40(3), pp. 207-222. ISSN 01446193
Hu, M and Skibniewski, M (2022) The impact of the design team characteristics on the sustainable building construction cost: Structural equation model analysis. Architectural Engineering and Design Management, 18(5), pp. 614-630. ISSN 1745-2007
Hu, Songbo (2023) Identification and prevention of crane operational hazards by integrating BIM and pathfinding algorithm in construction planning. PhD thesis, Monash University, Australia.
Hu, Z; Li, Q; Liu, T; Wang, L and Cheng, Z (2021) Government equity investment, effective communication and public private partnership (PPP) performance: Evidence from China. Engineering, Construction and Architectural Management, 28(9), pp. 2811-2827. ISSN 0969-9988
Huang, B (2017) A hierarchical multi-stakeholder principal-agent model for (anti-) corruption in public infrastructure procurement. PhD thesis, Cornell University, USA.
Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.
Huang, H; Zhang, C and Hammad, A (2021) Effective scanning range estimation for using tls in construction projects. Journal of Construction Engineering and Management, 147(9): 04021106, ISSN 0733-9364
Huang, J; Han, D; Zhang, H and Cui, W (2024) Framework and case study for the assembly accuracy prediction of prefabricated buildings using BIM and tls. Architectural Engineering and Design Management, 20(6), pp. 1427-1453. ISSN 1745-2007
Huang, K-S (2003) Development-related BOT: A lesson of under-utilized and over-utilized development synergy in Taiwan. DDes thesis, Harvard University, USA.
Huang, X (2003) The owner's role in construction safety. PhD thesis, University of Florida, USA.
Huang, X (2012) Estimating the cost of engineering services using parametrics and the bathtub failure model. PhD thesis, University of Bath, UK.
Huang, X and Hinze, J (2003) Analysis of construction worker fall accidents. Journal of Construction Engineering and Management, 129(3), pp. 262-271. ISSN 0733-9364
Huang, Y L (2008) The pricing of conditional performance guarantees with risky collateral. Construction Management and Economics, 26(9), pp. 967-978. ISSN 1466433X
Huang, Y L and Lin, W (2010) Does debt structure matter? Estimating contractor default barrier by the down-and-out call option approach. Construction Management and Economics, 28(9), pp. 947-958. ISSN 1466433X
Huangfu, D; Chang, Y F; Lim, S L and Li, L (2025) Gap analysis between industry expectations and competencies of fresh quantity surveying graduates in China. International Journal of Construction Management, 25(16), pp. 2121-2136. ISSN 1562-3599
Hubbard, B J and Middaugh, B (2013) Leveraging bluetooth consumer electronics as proximity sensors to construction health hazards. International Journal of Construction Education and Research, 9(2), pp. 117-131. ISSN 1557-8771
Hudak, D and Maxwell, M (2007) A macro approach to estimating correlated random variables in engineering production projects. Construction Management and Economics, 25(8), pp. 883-892. ISSN 1466433X
Hughes, A J (2022) On risk-based decision-making for structural health monitoring. PhD thesis, University of Sheffield, UK.
Hughes, M; Palmer, J; Cheng, V and Shipworth, D (2013) Sensitivity and uncertainty analysis of england's housing energy model. Building Research & Information, 41(2), pp. 156-167. ISSN 0961-3218
Hughes, W P; Ancell, D; Gruneberg, S and Hirst, L (2004) Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.
Hulathdoowage, N D; Karunasena, G; Udawatta, N and Liu, C (2024) Essential parameters in stepwise retrofitting for long-term emission reduction in residential buildings. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Hulio, Z H; Yousufzai, G and Jiang, W (2021) Statistical analysis of wind resource and energy potential assessment of quaidabad site, sindh Pakistan. Journal of Engineering, Design and Technology, 19(6), pp. 1291-1316. ISSN 1726-0531
Hung, C Y and Cheng, E W L (2014) Estimating contractors' efficiency with panel data: Comparison of the data envelopment analysis, Cobb-Douglas and translog production function methods. Construction Innovation, 14(3), pp. 274-291. ISSN 1471-4175
Huo, T; Ren, H; Cai, W; Shen, G Q; Liu, B; Zhu, M and Wu, H (2018) Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: Case study in Hong Kong. Journal of Construction Engineering and Management, 144(3): 05018001, ISSN 0733-9364
Hussain, R S (2017) Investigating the business process implications of managing road works and street works. PhD thesis, Loughborough University, UK.
Hussein, M; Darko, A; Eltoukhy, A E E and Zayed, T (2022) Sustainable logistics planning in modular integrated construction using multimethod simulation and taguchi approach. Journal of Construction Engineering and Management, 148(6): 04022022, ISSN 0733-9364
Hussey, H and Atanasov, V (2024) Improving the methods of description of building works in the UK. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Hussey, H; Thurairajah, N; Ginige, K and Goulding, J (2019) Establishing descriptions of building work in UK. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Hussey, H J (2023) Establishing criteria for descriptions of building work which include practicality and intricacy. PhD thesis, University of Northumbria at Newcastle, UK.
Hutchings, D M and Christofferson, J P (2004) Management practices of residential construction companies producing 25 or fewer units annually. International Journal of Construction Education and Research, 1(1), pp. 34-44. ISSN 1557-8771
Hutchings, Sally J (2023) An investigation of methods used to estimate the future burden of disease due to occupation. PhD thesis, University of Manchester, UK.
Huuhka, S; Moisio, M and Arnould, M (2024) Evaluating past and future building operational emissions: Improved method. Buildings & Cities, 5(1), pp. 150-161. ISSN 2632-6655
Huynh, H T (2021) Game theory applications in construction project management. PhD thesis, Catholic University of America, USA.
Hvid Horup, L; Ohms, P K; Hauschild, M; Gummidi, S R B; Secher, A Q; Thuesen, C and Ryberg, M (2024) Evaluating mitigation strategies for building stocks against absolute climate targets. Buildings & Cities, 5(1), pp. 117-132. ISSN 2632-6655
Hwang, J.; Bagh, S. and Han, K. (2026) Toward automated SLAM-to-BIM for digital twin applications: BIM-assisted 360-degree camera-based visual SLAM using reference point-based bundle adjustment. Journal of Construction Engineering and Management, 152(10): 04026161, ISSN 0733-9364
Hwang, S; Blay, K; Osmani, M and Wang, M (2026) Blockchain-integrated relational project governance. Journal of Construction Engineering and Management, 152(3): 04026003, ISSN 0733-9364
Hwang, B G; Shan, M; Zhu, L and Lim, W C (2020) Cost control in megaprojects: Efficacy, tools and techniques, key knowledge areas and project comparisons. International Journal of Construction Management, 20(5), pp. 437-449. ISSN 1562-3599
Hwang, B G; Thomas, S R; Haas, C T and Caldas, C H (2009) Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), pp. 187-198. ISSN 0733-9364
Hwang, B G and Yang, S (2014) Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(2), pp. 190-205. ISSN 0969-9988
Hwang, S (2009) Dynamic regression models for prediction of construction costs. Journal of Construction Engineering and Management, 135(5), pp. 360-367. ISSN 0733-9364
Hwang, S (2010) Cross-validation of short-term productivity forecasting methodologies. Journal of Construction Engineering and Management, 136(9), pp. 1037-1046. ISSN 0733-9364
Hwang, S (2011) Time series models for forecasting construction costs using time series indexes. Journal of Construction Engineering and Management, 137(9), pp. 656-662. ISSN 0733-9364
Hwang, S and Liu, L Y (2010) Contemporaneous time series and forecasting methodologies for predicting short-term productivity. Journal of Construction Engineering and Management, 136(9), pp. 1047-1055. ISSN 0733-9364
Hwang, S; Park, M; Lee, H S and Kim, H (2012) Automated time-series cost forecasting system for construction materials. Journal of Construction Engineering and Management, 138(11), pp. 1259-1269. ISSN 0733-9364
Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hyari, K; El-Mashaleh, M and Kandil, A (2010) Optimal assignment of multiskilled labor in building construction projects. International Journal of Construction Education and Research, 6(1), pp. 70-80. ISSN 1557-8771
Hyari, K H; Shatarat, N and Khalafallah, A (2017) Handling risks of quantity variations in unit-price contracts. Journal of Construction Engineering and Management, 143(10): 04017079, ISSN 0733-9364
Hyari, K H; Tarawneh, Z S and Katkhuda, H N (2016) Detection model for unbalanced pricing in construction projects: A risk-based approach. Journal of Construction Engineering and Management, 142(12): 04016078, ISSN 0733-9364
Hyari, K H and Thneibat, M (2025) Detecting skewed pricing in tenders for public-sector projects. Construction Innovation, 25(4), pp. 1153-1170. ISSN 1471-4175
Hyung, W G; Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(2), pp. 561-578. ISSN 0969-9988
Ibbotson, K (2020) Prioritising carbon reduction in UK public sector flood and coastal risk management. PhD thesis, University of Bolton, UK.
Ibbs, C W J (1980) Risk, complex decision-making and the application of multiattribute utility analysis in the construction industry. PhD thesis, University of California, Berkeley, USA.
Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364
Ibbs, W and Nguyen, L D (2007) Alternative for quantifying field-overhead damages. Journal of Construction Engineering and Management, 133(10), pp. 736-742. ISSN 0733-9364
Ibironke, O T; Oladinrin, T O; Adeniyi, O and Eboreime, I V (2013) Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria. Journal of Construction in Developing Countries, 18(1), pp. 53-72. ISSN 1823-6499
Ibrahim, M N (2022) Risk management in construction of megahousing projects in Egypt. PhD thesis, London South Bank University, UK.
Ibrahim, M W; Hanna, A S; Russell, J S; Abotaleb, I S and El-Adaway, I H (2020) Quantitative analysis of the impacts of out-of-sequence work on project performance. Journal of Construction Engineering and Management, 146(8): 04020090, ISSN 0733-9364
Ibrahim, M W W (2018) Improving project performance by mitigating out-of-sequence work and assessing construction readiness. PhD thesis, University of Wisconsin - Madison, USA.
Ibrahim Khil, Mohammad Hashim (2025) Automated construction progress monitoring of buildings through mobile mapping and as-built modeling. PhD thesis, University of New South Wales, Australia.
Idoro, G I (2012) Influence of project plans on the outcome of construction projects procured by design-build in Nigeria. Journal of Construction in Developing Countries, 17(2), pp. 81-103. ISSN 1823-6499
Idoro, G I (2012) The influence of project documents on the outcome of construction projects procured by traditional contracts in Nigeria. Journal of Construction in Developing Countries, 17(1), pp. 1-19. ISSN 1823-6499
Idowu, O S and Lam, K C (2020) Conceptual quantities estimation using bootstrapped support vector regression models. Journal of Construction Engineering and Management, 146(4): 04020018, ISSN 0733-9364
Idrus, A and Newman, J (2003) Ifess: A computer tool to aid structural engineers at the conceptual design stage. Construction Innovation, 3(3), pp. 127-143. ISSN 1471-4175
Igwe, U S; Mohamed, S F; Azwarie, M B M D; Nwofia, C M and Ihekweme, N M (2025) Assessment of post contract cost control issues in Nigeria: Quantity surveyors' perspective. International Journal of Construction Management, 25(14), pp. 1725-1735. ISSN 1562-3599
Igwe, U S; Mohamed, S F; Dzahir, M A M; Yusof, Z M and Khiyon, N A (2022) Towards a framework of automated resource model for post contract cost control of construction projects. International Journal of Construction Management, 22(16), pp. 3088-3097. ISSN 1562-3599
Ihsanallah, K O (1987) The management of superprojects. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Ikediashi, D I; Ogunlana, S O and Alotaibi, A (2014) Analysis of project failure factors for infrastructure projects in Saudi Arabia: A multivariate approach. Journal of Construction in Developing Countries, 19(1), pp. 35-52. ISSN 1823-6499
Ikuabe, M; Aigbavboa, C and Kissi, E (2023) Potential applications and benefits of humanoids in the construction industry: A south African perspective. International Journal of Building Pathology and Adaptation, 41(6), pp. 254-268. ISSN 23984708
Ikuabe, M; Oke, A E and Aigbavboa, C (2020) Impact of contractors' opportunism on construction project transaction costs: Construction professionals' perception. Journal of Financial Management of Property and Construction, 25(1), pp. 125-141. ISSN 1366-4387
Illankoon, Illankoon Mudiyanselage Chethana Sanathani (2018) A life-cycle cost model for green commercial office buildings with optimal green star credits. PhD thesis, Western Sydney University, Australia.
Ilozor, B D and Ilozor, D B (2005) Open-plan attributes and effective facilities management. Journal of Engineering, Design and Technology, 3(1), pp. 1-11. ISSN 1726-0531
Ilozor, B D and Ilozor, D B (2005) Openplan attributes and effective facilities management. Journal of Engineering, Design and Technology, 3(1), pp. 1-11. ISSN 1726-0531
Imran, S A; Commuri, S; Barman, M; Zaman, M and Beainy, F (2017) Modeling the dynamics of asphalt-roller interaction during compaction. Journal of Construction Engineering and Management, 143(7): 04017015, ISSN 0733-9364
Indrastuti (2014) Unit cost modelling of public building project in Kepulauan Riau, Indonesia. PhD thesis, University of Malaya, Malaysia.
Ingle, A; Moezzi, M; Lutzenhiser, L and Diamond, R (2014) Better home energy audit modelling: Incorporating inhabitant behaviours. Building Research & Information, 42(4), pp. 409-421. ISSN 0961-3218
Inti, S (2016) A decision making approach for selection of sustainable pavements in Texas by integrating life cycle cost analysis (LCCA), life cycle assessment (LCA) of environmental and social impacts. PhD thesis, University of Texas at El Paso, USA.
Invernizzi, D C (2019) Benchmarking nuclear decommissioning. PhD thesis, University of Leeds, UK.
Inyang, E D (1983) Some aspects of risk analysis for decision making in engineering projects management. PhD thesis, University of Manchester, UK.
Inyang, N; Al-Hussein, M; El-Rich, M and Al-Jibouri, S (2012) Ergonomic analysis and the need for its integration for planning and assessing construction tasks. Journal of Construction Engineering and Management, 138(12), pp. 1370-1376. ISSN 0733-9364
Inácio, M F M (1999) The building deconstruction process and the debris trail: towards a dynamic model. PhD thesis, University of Salford, UK.
Ioannidou, D; Zerbi, S; García de Soto, B and Habert, G (2018) Where does the money go? Economic flow analysis of construction projects. Building Research & Information, 46(4), pp. 348-366. ISSN 0961-3218
Ioannou, P G (1988) Geologic exploration and risk reduction in underground construction. Journal of Construction Engineering and Management, 114(4), pp. 532-547. ISSN 0733-9364
Ioannou, P G (1989) Evaluation of subsurface exploration programs. Journal of Construction Engineering and Management, 115(3), pp. 339-356. ISSN 0733-9364
Ioannou, P G (2022) Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid. Journal of Construction Engineering and Management, 148(3): 04021205, ISSN 0733-9364
Ioannou, P G and Carr, R I (1988) Advanced building technology matrix system. Journal of Construction Engineering and Management, 114(4), pp. 517-531. ISSN 0733-9364
Ip, K; Miller, A and Ellis, J (2003) Criteria and measurement of indoor air quality in sustainable buildings. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Irfan, M; Malik, M S A and Kaka Khel, S S U H (2020) Effect of factors of organizational structure influencing nonphysical waste in road projects of developing countries. Engineering, Construction and Architectural Management, 27(10), pp. 3135-3153. ISSN 0969-9988
Irizarry, J (2011) Application of methods analysis to steel erection tasks: Identification of factors affecting labor performance. International Journal of Construction Management, 11(4), pp. 31-47. ISSN 1562-3599
Iroroakpo, G I (2007) A comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD thesis, University of Lagos, Nigeria.
Isaac, S and Navon, R (2014) Can project monitoring and control be fully automated? Construction Management and Economics, 32(6), pp. 495-505. ISSN 01446193
Isah, M A and Kim, B S (2025) Question-answering system powered by knowledge graph and generative pretrained transformer to support risk identification in tunnel projects. Journal of Construction Engineering and Management, 151(1): 04024193, ISSN 0733-9364
Isaksson, T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.
Isaton, Camila (2023) A collaborative risk identification model with cost risk simulation: A case study of a port logistics storage yard. PhD thesis, Universidade Federal de Santa Catarina, Brazil.
Isidore, L J (1999) Integrated range estimating and probabilistic scheduling of construction projects. PhD thesis, Texas A&M University, USA.
Isidore, L J and Back, W E (2001) Probabilistic optimal-cost scheduling. Journal of Construction Engineering and Management, 127(6), pp. 431-437. ISSN 0733-9364
Isidore, L J and Back, W E (2002) Multiple simulation analysis for probabilistic cost and schedule integration. Journal of Construction Engineering and Management, 128(3), pp. 211-219. ISSN 0733-9364
Isidore, L J; Back, W E and Fry, G T (2001) Integrated probabilistic schedules and estimates from project simulated data. Construction Management and Economics, 19(4), pp. 417-426. ISSN 01446193
Islam, M M and Mohamed, S (2009) Bid-winning potential optimization for concession schemes with imprecise investment parameters. Journal of Construction Engineering and Management, 135(8), pp. 690-700. ISSN 0733-9364
Islam, M S; Mohandes, S R; Mahdiyar, A; Fallahpour, A and Olanipekun, A O (2022) A coupled genetic programming Monte Carlo simulation-based model for cost overrun prediction of thermal power plant projects. Journal of Construction Engineering and Management, 148(8): 04022073, ISSN 0733-9364
Islam, M S; Nepal, M and Skitmore, M (2025) Structuring risks for a comprehensive understanding of cost overruns in power plant projects. Construction Innovation, 25(3), pp. 1014-1032. ISSN 1471-4175
Islam, M S; Nepal, M P and Skitmore, M (2019) Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects. Journal of Construction Engineering and Management, 145(2): 04018126, ISSN 0733-9364
Islam, M S; Salem, M; Tantawy, M and Salah, M (2024) Cost overrun risk assessment for healthcare projects: A modified fuzzy group decision-making approach. Journal of Construction Engineering and Management, 150(12): 04024168, ISSN 0733-9364
Islam, Muhammad Saiful (2019) Modelling cost overrun risks in power plant projects. PhD thesis, Queensland University of Technology, Australia.
Ismail, M Z; Mohamad Ramly, Z; Darmansah, N F and Misnan, M S (2025) Rail construction cost risk management with bow-tie analysis: Contractor’s perspective. Built Environment Project and Asset Management, 15(4), pp. 753-771. ISSN 2044-124X
Ismail, N M M I (2015) Factors in building design that improve building maintainability in Malaysia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ismail, Noor Akmal Adillah Binti (2017) Construction cost estimating incorporating building information modelling in the Malaysian construction industry. PhD thesis, Queensland University of Technology, Australia.
Ismail, S; Mohamad, R and Mohd Said, J (2022) Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia. Built Environment Project and Asset Management, 12(5), pp. 704-718. ISSN 2044-124X
Ismaila, S O; Akanbi, O G and Ngassa, C N (2014) Models for estimating the anthropometric dimensions using standing height for furniture design. Journal of Engineering, Design and Technology, 12(3), pp. 336-347.
Issa, M H; Attalla, M; Rankin, J H and Christian, A J (2011) Energy consumption in conventional, energyretrofitted and green LEED Toronto schools. Construction Management and Economics, 29(4), pp. 383-395. ISSN 1466433X
Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models. PhD thesis, Purdue University, USA.
Ive, G (2006) Re-examining the costs and value ratios of owning and occupying buildings. Building Research & Information, 34(3), pp. 230-245. ISSN 0961-3218
Ive, G; Murray, A and Marsh, R (2015) Cost and value ratios of operating renewed English secondary schools. Building Research & Information, 43(4), pp. 465-485. ISSN 0961-3218
Iyer, K C and Jha, K N (2003) Analysis of critical coordination activities of Indian construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Iyer, K C and Sagheer, M (2010) Hierarchical structuring of PPP risks using interpretative structural modeling. Journal of Construction Engineering and Management, 136(2), pp. 151-159. ISSN 0733-9364
Izzat, R M (1977) A computerised approach to bidding strategy in civil engineering. PhD thesis, Aston University, UK.
Jaafar, T (1992) A unified methodology for project planning risk. PhD thesis, Nottingham Trent University, UK.
Jaafari, A (1977) Development and use of composite fibrous materials in the UK construction industry. PhD thesis, University of Surrey, UK.
Jaafari, A (1984) Criticism of CPM for project planning analysis. Journal of Construction Engineering and Management, 110(2), pp. 222-233. ISSN 0733-9364
Jaafari, A and Mateffy, V K (1986) Games people play with cost control in Australia. Journal of Construction Engineering and Management, 112(4), pp. 566-581. ISSN 0733-9364
Jablonowski, C J (2015) Quantitative method to model the underreporting of safety incidents. Journal of Construction Engineering and Management, 141(5): 06014012, ISSN 0733-9364
Jackson, B J (2005) Design-build education at associated schools of construction undergraduate programs. International Journal of Construction Education and Research, 1(2), pp. 75-88. ISSN 1557-8771
Jackson, G (2003) Contingency for cost control in project management: A case study. Construction Economics and Building, 3(1), pp. 1-12. ISSN 2204-9029
Jackson, S (2002) Project cost overruns and risk management. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Jackson, S H; Griffith, A; Stephenson, P and Smith, J (1997) Risk management tools and techniques used when estimating initial budgets for building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Jacob, J C; Pandit, D and Sen, J (2025) Developing a validated simulation model of micro-zonal air-conditioning to evaluate thermal comfort parameters. Architectural Engineering and Design Management, 21(2), pp. 289-314. ISSN 1745-2007
Jacques de Sousa, L; Poças Martins, J and Sanhudo, L (2024) Predicting construction project compliance with machine learning model: case study using Portuguese procurement data. Engineering, Construction and Architectural Management, 31(13), pp. 285-302. ISSN 0969-9988
Jadhav, Ajay (2023) Development of scope of services for procurement of professional consultant services on transportation projects: A study of South carolina department of transportation. PhD thesis, Clemson University, USA.
Jafari, A (2018) A decision-making framework for the selection of sustainable alternatives for energy-retrofits. PhD thesis, University of New Mexico, USA.
Jafari, A and Love, P E D (2013) Quality costs in construction: Case of Qom monorail project in iran. Journal of Construction Engineering and Management, 139(9), pp. 1244-1249. ISSN 0733-9364
Jafari, A; Valentin, V and Berrens, R P (2017) Estimating the economic value of energy improvements in U.S. Residential housing. Journal of Construction Engineering and Management, 143(8): 04017048, ISSN 0733-9364
Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.
Jafary, P.; Shojaei, D.; Rajabifard, A. and Ngo, T. (2026) AI-augmented construction cost estimation: An ensemble natural language processing (NLP) model to align quantity take-offs with cost indexes. International Journal of Construction Management, 26(8), pp. 1508-1526. ISSN 1562-3599
Jafary, P; Shojaei, D; Rajabifard, A and Ngo, T (2024) BIM and real estate valuation: Challenges, potentials and lessons for future directions. Engineering, Construction and Architectural Management, 31(4), pp. 1642-1677. ISSN 0969-9988
Jafarzadeh, R; Ingham, J M; Walsh, K Q; Hassani, N and Ghodrati Amiri, G R (2015) Using statistical regression analysis to establish construction cost models for seismic retrofit of confined masonry buildings. Journal of Construction Engineering and Management, 141(5): 04014098, ISSN 0733-9364
Jafarzadeh, R; Ingham, J M; Wilkinson, S; González, V and Aghakouchak, A A (2014) Application of artificial neural network methodology for predicting seismic retrofit construction costs. Journal of Construction Engineering and Management, 140(2): 04013044, ISSN 0733-9364
Jafarzadeh, R; Wilkinson, S; González, V; Ingham, J M and Amiri, G G (2014) Predicting seismic retrofit construction cost for buildings with framed structures using multilinear regression analysis. Journal of Construction Engineering and Management, 140(3): 4013062, ISSN 0733-9364
Jahan, Israt (2024) Life-cycle sustainability analysis of construction and demolition wood waste to achieve circular economy. PhD thesis, RMIT University, Australia.
Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.
Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599
Jain, S; Singhal, S and Jain, N K (2021) Construction and demolition waste (C&DW) in India: Generation rate and implications of C&DW recycling. International Journal of Construction Management, 21(3), pp. 261-270. ISSN 1562-3599
Jalaei, F; Zoghi, M and Khoshand, A (2021) Life cycle environmental impact assessment to manage and optimize construction waste using building information modeling (BIM). International Journal of Construction Management, 21(8), pp. 784-801. ISSN 1562-3599
Jalilzadehazhari, E; Johansson, P; Johansson, J and Mahapatra, K (2017) Application of analytical hierarchy process for selecting an interior window blind. Architectural Engineering and Design Management, 13(4), pp. 308-324. ISSN 1745-2007
Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.
Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.
Jang, W S (2007) Embedded system for construction material tracking using combination of radio frequency and ultrasound signal. PhD thesis, University of Maryland, College Park, USA.
Jarder, S L N; Garciano, L E O and Maruyama, O (2021) Probable maximum loss of a pipe network due to earthquakes: A case study in iloilo city, Philippines. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 223-237. ISSN 1759-5916
Jarkas, A M (2012) Factors influencing power-trowelling productivity of concrete surface floors. Journal of Engineering, Design and Technology, 10(1), pp. 34-51. ISSN 1726-0531
Jarkas, A M (2013) Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(1), pp. 53-75. ISSN 1366-4387
Jarkas, A M (2017) Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity? Engineering, Construction and Architectural Management, 24(3), pp. 537-552. ISSN 0969-9988
Jarkas, A M and Horner, R M W (2015) Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. Construction Management and Economics, 33(8), pp. 625-639. ISSN 01446193
Jarrah, R; Kulkarni, D and O'Connor, J T (2007) Cash flow projections for selected TxDoT highway projects. Journal of Construction Engineering and Management, 133(3), pp. 235-241. ISSN 0733-9364
Jaselskis, E J (1988) Achieving construction project success through predictive discrete choice models. PhD thesis, University of Texas at Austin, USA.
Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations. PhD thesis, Luleå University of Technology, Sweden.
Javid, M and Seneviratne, P N (2000) Investment risk analysis in airport parking facility development. Journal of Construction Engineering and Management, 126(4), pp. 298-305. ISSN 0733-9364
Jawad, D J (2003) Life cycle cost optimization for infrastructure facilities. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.
Jaya, N M (2014) An activity-based cost controlling model for improving the management of construction project overheads. PhD thesis, University of Salford, UK.
Jayaraj, S; Doerfel, M L and Williams, T (2022) Clique to win: Impact of cliques, competition, and resources on team performance. Journal of Construction Engineering and Management, 148(7): 04022047, ISSN 0733-9364
Jayasuriya, S; Zhang, G and Jing Yang, R (2019) Challenges in public private partnerships in construction industry: A review and further research directions. Built Environment Project and Asset Management, 9(2), pp. 172-185. ISSN 2044-124X
Jayawardane, A K; Price, A D and Harris, F C (1995) Measurement of brickwork and blockwork productivity: Part A: Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. Building Research & Information, 23(2), pp. 81-86. ISSN 0961-3218
Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. PhD thesis, Loughborough University, UK.
Jefferies, D and Schweber, L (2022) Professional judgement: An institutional logic approach to contractor tender pricing. Buildings & Cities, 3(1), pp. 518-533. ISSN 2632-6655
Jegede, O E and Taki, A (2022) Optimization of building envelopes using indigenous materials to achieve thermal comfort and affordable housing in Abuja, Nigeria. International Journal of Building Pathology and Adaptation, 40(2), pp. 219-247. ISSN 23984708
Jeljeli, M N (1994) A risk-based methodology for estimating contractors' liability in superfund cleanup construction. PhD thesis, University of Wisconsin - Madison, USA.
Jeljeli, M N and Russell, J S (1995) Coping with uncertainty in environmental construction: Decision-analysis approach. Journal of Construction Engineering and Management, 121(4), pp. 370-380. ISSN 0733-9364
Jennings, W (2012) Why costs overrun: Risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(6), pp. 455-462. ISSN 1466433X
Jeon, J; Lee, J and Ham, Y (2019) Quantifying the impact of building envelope condition on energy use. Building Research & Information, 47(4), pp. 404-420. ISSN 0961-3218
Jergeas, G F (1989) Detailed design and constructability. PhD thesis, Loughborough University, UK.
Jergeas, G F and Hartman, F T (1994) Contractors' construction-claims avoidance. Journal of Construction Engineering and Management, 120(3), pp. 553-560. ISSN 0733-9364
Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Risk allocation model for price escalations in construction projects: Integrating bargaining game theory and probabilistic Bayesian modeling. Journal of Construction Engineering and Management, 151(9): 04025134, ISSN 0733-9364
Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Modeling framework to quantify and gauge project cost risks due to construction material price volatilities using predictive probabilistic deep-learning algorithms and stochastic risk modeling. Journal of Construction Engineering and Management, 151(7): 04025071, ISSN 0733-9364
Jha, K N and Chockalingam, C T (2011) Prediction of schedule performance of Indian construction projects using an artificial neural network. Construction Management and Economics, 29(9), pp. 901-911. ISSN 1466433X
Ji, S H; Park, M and Lee, H S (2010) Data preprocessing-based parametric cost model for building projects: Case studies of Korean construction projects. Journal of Construction Engineering and Management, 136(8), pp. 844-853. ISSN 0733-9364
Ji, S H; Park, M and Lee, H S (2012) Case adaptation method of case-based reasoning for construction cost estimation in Korea. Journal of Construction Engineering and Management, 138(1), pp. 43-52. ISSN 0733-9364
Ji, W and Abourizk, S M (2018) Data-driven simulation model for quality-induced rework cost estimation and control using absorbing Markov chains. Journal of Construction Engineering and Management, 144(8): 04018078, ISSN 0733-9364
Ji, Wenying (2018) Simulation-based analytics for fabrication quality-associated decision support. PhD thesis, University of Alberta, Canada.
Jia, B; Yang, Y; Xie, B and Yu, X (2021) Novel geometric control technology for precast segmental bridges. Journal of Construction Engineering and Management, 147(4): 04021006, ISSN 0733-9364
Jia, J (2017) Multi-criteria evaluation in support of the decision-making process in highway construction projects. PhD thesis, Florida International University, USA.
Jiang, W.; Jiang, J.; Martek, I. and Jiang, W. (2025) Critical risk management strategies for the operation of public–private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988
Jiang, A and Zhu, Y (2012) Impact of incentives and system efficiency on the life cycle cost of photovoltaic systems. International Journal of Construction Education and Research, 8(3), pp. 204-222. ISSN 1557-8771
Jiang, H; Jin, X H and Liu, C (2013) The effects of the late 2000s global financial crisis on Australia's construction demand. Construction Economics and Building, 13(3), pp. 65-79. ISSN 2204-9029
Jiang, H and Liu, C (2011) Forecasting construction demand: A vector error correction model with dummy variables. Construction Management and Economics, 29(9), pp. 969-979. ISSN 1466433X
Jiang, H and Liu, C (2014) A panel vector error correction approach to forecasting demand in regional construction markets. Construction Management and Economics, 32(12), pp. 1205-1221. ISSN 01446193
Jiang, Heng (2013) Econometric techniques for estimating construction demand in Australia. PhD thesis, Deakin University, Australia.
Jiang, Q (2020) Estimation of construction project building cost by back-propagation neural network. Journal of Engineering, Design and Technology, 18(3), pp. 601-609. ISSN 1726-0531
Jiang, W; Jiang, J; Martek, I and Jiang, W (2025) Critical risk management strategies for the operation of public-private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988
Jiang, W; Martek, I; Hosseini, M R and Chen, C (2021) Political risk management of foreign direct investment in infrastructure projects: Bibliometric-qualitative analyses of research in developing countries. Engineering, Construction and Architectural Management, 28(1), pp. 125-153. ISSN 0969-9988
Jiang, W; Jiang, J; Martek, I and Jiang, W (2025) Critical risk management strategies for the operation of public-private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988
Jiang, Y (2020) Determination of elevations for excavation operations using drone technologies. PhD thesis, Marquette University, USA.
Jiang, Y and Bai, Y (2020) Estimation of construction site elevations using drone-based orthoimagery and deep learning. Journal of Construction Engineering and Management, 146(8): 04020086, ISSN 0733-9364
Jiang, Y and Wu, H (2007) A method for highway agency to estimate highway construction durations and set contract times. International Journal of Construction Education and Research, 3(3), pp. 199-216. ISSN 1557-8771
Jiang, Ziang (2025) Advancing scan-vs-BIM in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.
Jiang, Ziang (2025) Advancing scan-vs-bim in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.
Jimoh, I (2021) What explains the efficiency of major public project delivery in Nigeria? PhD thesis, University of Cambridge, UK.
Jin, R; Han, S; Hyun, C and Cha, Y (2016) Application of case-based reasoning for estimating preliminary duration of building projects. Journal of Construction Engineering and Management, 142(2): 04015082, ISSN 0733-9364
Jin, R; Han, S; Hyun, C and Kim, J (2014) Improving accuracy of early stage cost estimation by revising categorical variables in a case-based reasoning model. Journal of Construction Engineering and Management, 140(7): 04014025, ISSN 0733-9364
Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988
Jin, Y (2013) Evaluating infrastructure performance to assist facility management toward sustainable systems. PhD thesis, Michigan Technological University, USA.
Jirandeh, R R; Ghazi, M; Sotoodeh, A F and Nikian, M (2021) Plate-fin heat exchanger network modeling, design and optimization: a novel and comprehensive algorithm. Journal of Engineering, Design and Technology, 19(5), pp. 1017-1043. ISSN 1726-0531
Joannides, M M; Olbina, S and Issa, R R A (2012) Implementation of building information modeling into accredited programs in architecture and construction education. International Journal of Construction Education and Research, 8(2), pp. 83-100. ISSN 1557-8771
Jobling, P E and Smith, N J (2018) Experience of the role of contracts in megaproject execution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 18-24. ISSN 17514304
John, S. T.; Roy, B. K.; Sarkar, P. and Davis, R. (2020) IoT enabled real-time monitoring system for early-age compressive strength of concrete. Journal of Construction Engineering and Management, 146(2): 05019020, ISSN 0733-9364
John, S T; Sarkar, P and Davis, R (2023) A long-range wide-area network system for monitoring early-age concrete compressive strength. Journal of Construction Engineering and Management, 149(1): 04022148, ISSN 0733-9364
Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531
Johnson, R E; Sherif, A and Becker, F D (1987) Economics of university research laboratories: policy considerations. Construction Management and Economics, 5(4), ISSN 01446193
Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402-411. ISSN 1562-3599
Johnston, D W; Kahn, K P and Phillips, J B (1989) Formwork pressures in tall and thick concrete walls. Journal of Construction Engineering and Management, 115(3), pp. 444-461. ISSN 0733-9364
Johnstone, I M (2001) Periodic refurbishment and reductions in national costs to sustain dwelling services. Construction Management and Economics, 19(1), pp. 97-108. ISSN 01446193
Johnstone, I M (2004) Development of a model to estimate the benefit-cost ratio performance of housing. Construction Management and Economics, 22(6), pp. 607-617. ISSN 01446193
Jolly Cyril, E (2026) Mediating effect of innovation on the relationship between project financing and construction cost efficiency: Innovation integrated cost efficiency perspective. Journal of Construction Engineering and Management, 152(1): 04025226, ISSN 0733-9364
Jolly Cyril, E and Singla, H K (2020) Comparative analysis of profitability of real estate, industrial construction and infrastructure firms: Evidence from India. Journal of Financial Management of Property and Construction, 25(2), pp. 273-291. ISSN 1366-4387
Jonasson, S; Dunston, P S; Ahmed, K and Hamilton, J (2002) Factors in productivity and unit cost for advanced machine guidance. Journal of Construction Engineering and Management, 128(5), pp. 367-374. ISSN 0733-9364
Jones, C (2014) Assessing safety culture and safety performance in a high hazard industry. PhD thesis, University of Nottingham, UK.
Jonnalagadda, S (2016) Artificial neural networks, non linear auto regression networks (NARX) and causal loop diagram approaches for modelling bridge infrastructure conditions. PhD thesis, Clemson University, USA.
Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.
Jordan Srour, F; Kiomjian, D and Srour, I M (2018) Automating the use of learning curve models in construction task duration estimates. Journal of Construction Engineering and Management, 144(7): 04018055, ISSN 0733-9364
Jorge, J (1990) Model of uniform cost policies and procedures for the establishment of construction equipment rates. PhD thesis, University of Florida, USA.
Joseph, V R and Mustaffa, N K (2023) Carbon emissions management in construction operations: A systematic review. Engineering, Construction and Architectural Management, 30(3), pp. 1271-1299. ISSN 0969-9988
Joseph Garcia, A and Mollaoglu, S (2020) Individuals' capacities to apply transferred knowledge in AEC project teams. Journal of Construction Engineering and Management, 146(4): 04020016, ISSN 0733-9364
Joukar, A (2016) Analysis and management of the price volatility in the construction industry. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Joukar, A and Nahmens, I (2016) Volatility forecast of construction cost index using general autoregressive conditional heteroskedastic method. Journal of Construction Engineering and Management, 142(1): 04015051, ISSN 0733-9364
Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects. PhD thesis, Concordia University, Canada.
Ju, J.; Liu, X.; Xu, F.; Cao, B.; Chen, W.; Wang, X. and Tian, G. (2026) Operational phase recognition and power matching under shoveling conditions in an autonomous loading mobile concrete mixer. Journal of Construction Engineering and Management, 152(9): 04026131, ISSN 0733-9364
Jukic, D and Carmichael, D G (2016) Emission and cost effects of training for construction equipment operators: A field study. Smart and Sustainable Built Environment, 5(2), pp. 96-110. ISSN 2046-6099
Julayhe, N and Rahman, M M (2021) Dwellers' perception on challenges and motivators of greening existing buildings in Brunei darussalam. Built Environment Project and Asset Management, 11(5), pp. 870-887. ISSN 2044-124X
Jumas, D; Mohd-Rahim, F A; Zainon, N and Utama, W P (2018) Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects. Built Environment Project and Asset Management, 8(4), pp. 348-357. ISSN 2044-124X
Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.
Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364
Jung, S (2010) Facility siting and layout optimization based on process safety. PhD thesis, Texas A&M University, USA.
Jung, S-K (1993) A study of single-family residential construction activity: Simultaneous transfer function (STF) analysis. PhD thesis, Georgia State University, USA.
Jung, Y and Kang, S (2007) Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management, 133(1), pp. 10-21. ISSN 0733-9364
Jung, Y and Woo, S (2004) Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management, 130(5), pp. 616-625. ISSN 0733-9364
Jung, Y J (2007) Subsurface utility engineering for highway projects: A study of utility impact rating and benefit-cost analysis. PhD thesis, Pennsylvania State University, USA.
Junga, W J (1981) The building cycle, shorter cycles of residential construction and federal housing programs: An empirical and theoretical analysis. PhD thesis, University of Connecticut, USA.
Kabbani, I A (1993) Decision support life cycle analysis system in building design. PhD thesis, University of Colorado at Boulder, USA.
Kaboli, A S and Carmichael, D G (2014) Truck dispatching and minimum emissions earthmoving. Smart and Sustainable Built Environment, 3(2), pp. 170-186. ISSN 2046-6099
Kaboli, A S and Carmichael, D G (2014) Optimum scraper load time and fleet size for minimum emissions. International Journal of Construction Management, 14(4), pp. 209-226. ISSN 1562-3599
Kaboli, A S and Carmichael, D G (2016) An examination of the dret model and the influence of payload, haul grade and truck type on earthmoving emissions. International Journal of Construction Management, 16(2), pp. 95-108. ISSN 1562-3599
Kaboli, Alireza (2014) Cost and emissions analysis of earthmoving operations. PhD thesis, University of New South Wales, Australia.
Kader, A S A (1997) Cost modelling for inland waterway transport systems. PhD thesis, Liverpool John Moores University, UK.
Kadir, M R b A (1996) Conceptual phase best practices. PhD thesis, Loughborough University, UK.
Kadry, M; Osman, H and Georgy, M (2017) Causes of construction delays in countries with high geopolitical risks. Journal of Construction Engineering and Management, 143(2): 04016095, ISSN 0733-9364
Kahandawa, R; Domingo, N; Chawynski, G and Uma, S R (2021) Factors impacting post-earthquake damage repair cost estimations. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 29-49. ISSN 1759-5916
Kaiser, M J (2006) Offshore decommissioning cost estimation in the gulf of Mexico. Journal of Construction Engineering and Management, 132(3), pp. 249-258. ISSN 0733-9364
Kaiser, M J; Pulsipher, A G and Byrd, R C (2005) Cost of abrasive cutting in decommissioning operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 137-148. ISSN 0733-9364
Kaiser, M J; Pulsipher, A G and Martin, J (2005) Cost of site clearance and verification operations in the gulf of Mexico. Journal of Construction Engineering and Management, 131(1), pp. 117-126. ISSN 0733-9364
Kaka, A and Lewis, J (2003) Development of a company-level dynamic cash flow forecasting model. Construction Management and Economics, 21(7), pp. 693-705. ISSN 01446193
Kaka, A and Price, A D F (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), pp. 383-400. ISSN 01446193
Kaka, A P (1996) Towards more flexible and accurate cash flow forecasting. Construction Management and Economics, 14(1), pp. 35-44. ISSN 01446193
Kaka, A P (1996) Decision support system for plant-hirers' financial strategies. Journal of Financial Management of Property and Construction, 1(1), pp. 21-36. ISSN 1366-4387
Kaka, A P and Boussabaine, A H (1999) Updating techniques for cumulative cost forecasting on construction projects. Journal of Construction Procurement, 5(2), pp. 141-158. ISSN 1358-9180
Kaka, A P and Cheetham, D W (1997) The effect of some tendering and payment strategies on contractors' financial performance. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(1-2), pp. 133-145. ISSN 0969-9988
Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(1), pp. 48-60. ISSN 0969-9988
Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988
Kaka, A P and Price, A D F (1993) Modelling standard cost commitment curves for contractors' cash flow forecasting. Construction Management and Economics, 11(4), pp. 271-283. ISSN 01446193
Kaka, A P F (1990) Corporate financial model for construction contractors. PhD thesis, Loughborough University, UK.
Kakar, A S; Hasan, A; Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1570-1590. ISSN 1726-0531
Kakitahi, J M; Landin, A and Alinaitwe, H M (2013) An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266-280. ISSN 1471-4175
Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept. PhD thesis, Pennsylvania State University, USA.
Kalasapudi, V S (2017) Automatic change-based diagnosis of structures using spatiotemporal data and as-designed model. PhD thesis, Arizona State University, USA.
Kalhor, E and Valentin, V (2018) Cost estimation framework for optimal retrofit planning to mitigate residential building vulnerability to wildfires. Journal of Construction Engineering and Management, 144(4): 05018003, ISSN 0733-9364
Kalu, T C U (1990) New approach to construction management. Journal of Construction Engineering and Management, 116(3), pp. 494-513. ISSN 0733-9364
Kamal, A; Abas, M; Khan, D and Azfar, R W (2022) Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. International Journal of Construction Management, 22(6), pp. 1141-1157. ISSN 1562-3599
Kamanda-Kabague, B M (1981) Application of mathematical model techniques to the planning and control of overhead costs in the construction industry. PhD thesis, City, University of London, UK.
Kamardeen, I (2009) Strategic safety management information system for building projects in Singapore. Engineering, Construction and Architectural Management, 16(1), pp. 8-25. ISSN 0969-9988
Kaming, P F; Olomolaiye, P O; Holt, G D and Harris, F C (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94. ISSN 01446193
Kamma, R C and Jha, K N (2022) Quantifying building construction and demolition waste using permit data. Journal of Construction Engineering and Management, 148(9): 04022091, ISSN 0733-9364
Kang, K; Xiao, J and Moon, S (2025) Evaluating safety risks in pedestrian facilities for different ride modes: Application of a deep learning-based 3D scanning system. Journal of Construction Engineering and Management, 151(11): 04025183, ISSN 0733-9364
Kang, L S; Park, I C and Lee, B H (2001) Optimal schedule planning for multiple, repetitive construction process. Journal of Construction Engineering and Management, 127(5), pp. 382-390. ISSN 0733-9364
Kang, L S and Paulson, B C (1997) Adaptability of information classification systems for civil works. Journal of Construction Engineering and Management, 123(4), pp. 419-426. ISSN 0733-9364
Kang, L S and Paulson, B C (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management, 124(5), pp. 381-389. ISSN 0733-9364
Kang, S and Seo, J (2013) GIS method for haul road layout planning in large earthmoving projects: Framework and analysis. Journal of Construction Engineering and Management, 139(2), pp. 236-246. ISSN 0733-9364
Kang, Y; Kim, C; Son, H; Lee, S and Limsawasd, C (2013) Comparison of preproject planning for green and conventional buildings. Journal of Construction Engineering and Management, 139(11): 4013018, ISSN 0733-9364
Kang, Y; O'Brien, W J; Thomas, S and Chapman, R E (2008) Impact of information technologies on performance: Cross study comparison. Journal of Construction Engineering and Management, 134(11), pp. 852-863. ISSN 0733-9364
Kangari, R (1982) Construction project selection under risk: Market model approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kangari, R; Pruitt, J D and Cheema, T S (1988) Slipforming IBM tower. Journal of Construction Engineering and Management, 114(3), pp. 472-488. ISSN 0733-9364
Kannan, G and Vorster, M (2000) Development of an experience database for truck loading operations. Journal of Construction Engineering and Management, 126(3), pp. 201-209. ISSN 0733-9364
Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(4), pp. 272-282. ISSN 0969-9988
Kanoglu, A and Arditi, D (2001) A computer-based information system for architectural design offices. Construction Innovation, 1(1), pp. 15-29. ISSN 1471-4175
Kantianis, D D (2022) Design morphology complexity and conceptual building project cost forecasting. Journal of Financial Management of Property and Construction, 27(3), pp. 387-414. ISSN 1366-4387
Kapambwe, F C (2003) An evaluation of the implications of equity foreign direct investment risks in BOT infrastructure projects for overseas contractors in sub-Saharan Africa. PhD thesis, University of Reading, UK.
Kar, S (2021) Developing a decision support system for effective material management in construction. PhD thesis, Indian Institute of Technology Delhi, India.
Kar, S and Jha, K N (2019) Assessment of criticality of materials in a construction project. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Kar, S and Jha, K N (2021) Investigation into lead time of construction materials and influencing factors. Journal of Construction Engineering and Management, 147(3): 01998, ISSN 0733-9364
Kar, S and Jha, K N (2022) Assessing criticality of construction materials for prioritizing their procurement using ANP-TOPSIS. International Journal of Construction Management, 22(10), pp. 1852-1862. ISSN 1562-3599
Kar, S; Kothari, C and Jha, K N (2021) Developing an optimum material procurement schedule by integrating construction program and budget using NSGA-II. Journal of Construction Engineering and Management, 147(4): 04021017, ISSN 0733-9364
Karaa, F A and Nasr, A Y (1986) Resource management in construction. Journal of Construction Engineering and Management, 112(3), pp. 346-357. ISSN 0733-9364
Karafiath, L L (1988) Rolling resistance of off-road vehicles. Journal of Construction Engineering and Management, 114(3), pp. 458-471. ISSN 0733-9364
Karam, K S; Karam, J S and Einstein, H H (2007) Decision analysis applied to tunnel exploration planning. II: Consideration of uncertainty. Journal of Construction Engineering and Management, 133(5), pp. 354-363. ISSN 0733-9364
Karambakuwa, N (2024) The performance of small construction firms in South Africa under the cost leadership strategy. PhD thesis, Nelson Mandela University, South Africa.
Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(7), pp. 1579-1594. ISSN 0969-9988
Karamujic, H (2012) Modelling seasonality in Australian building approvals. Construction Economics and Building, 12(1), pp. 26-36. ISSN 2204-9029
Karatas, A and El-Rayes, K (2014) Optimal trade-offs between social quality of life and life-cycle cost in housing units. Journal of Construction Engineering and Management, 140(12): 04014058, ISSN 0733-9364
Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988
Karim, A and Adeli, H (1999) OO information model for construction project management. Journal of Construction Engineering and Management, 125(5), pp. 361-367. ISSN 0733-9364
Karim, A and Adeli, H (1999) A new generation software for construction scheduling and management. Engineering, Construction and Architectural Management, 6(4), pp. 380-390. ISSN 0969-9988
Karimi, H (2017) Quantitative analysis of the impact of craft labor availability on construction project performance. PhD thesis, University of Kentucky, USA.
Karimi, H; Danesh Ashtiani, H A and Aghanajafi, C (2019) Study of mixed materials heat exchanger using optimization techniques. Journal of Engineering, Design and Technology, 17(2), pp. 414-433. ISSN 1726-0531
Karimi, H; Taylor, T R B; Dadi, G B; Goodrum, P M and Srinivasan, C (2018) Impact of skilled labor availability on construction project cost performance. Journal of Construction Engineering and Management, 144(7): 04018057, ISSN 0733-9364
Karimi, S (2021) A systematic methodology for evaluating and balancing acceptance risks with pay factors for highway construction materials. PhD thesis, University of Maryland, College Park, USA.
Karpen, S (2013) The role of task openness in forming completion time estimates. PhD thesis, Indiana University, USA.
Karshenas, S (1984) Predesign cost estimating method for multistory buildings. Journal of Construction Engineering and Management, 110(1), pp. 79-86. ISSN 0733-9364
Karsten Winther, J; Nielsen, R; Schultz, C and Teizer, J (2021) Automated activity and progress analysis based on non-monotonic reasoning of construction operations. Smart and Sustainable Built Environment, 10(3), pp. 457-486. ISSN 2046-6099
Kashani, H; Ashuri, B; Shahandashti, S M and Lu, J (2015) Investment valuation model for renewable energy systems in buildings. Journal of Construction Engineering and Management, 141(2): 04014074, ISSN 0733-9364
Kashiwagi, D; Chong, N; Costilla, M; McMenimen, F and Egbu, C (2004) Impact of six sigma on construction performance. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kashiwagi, D and Savicky, J (2003) A case study of the transaction cost and value of the delivering of construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Kashiwagi, D T and Byfield, R (2002) Testing of minimization of subjectivity in best value procurement by using artificial intelligence systems in state of Utah procurement. Journal of Construction Engineering and Management, 128(6), pp. 496-502. ISSN 0733-9364
Kasozi, P and Tutesigensi, A (2007) A framework for appraising construction projects using carbon footprint. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Kasprowicz, T; Starczyk-Kołbyk, A and Wójcik, R R (2023) The randomized method of estimating the net present value of construction projects efficiency. International Journal of Construction Management, 23(12), pp. 2126-2133. ISSN 1562-3599
Kašpar, H M P (2022) Robert Adam and networks for building in eighteenth-century Britain. PhD thesis, University of Leeds, UK.
Kataoka, M (2008) Automated generation of construction plans from primitive geometries. Journal of Construction Engineering and Management, 134(8), pp. 592-600. ISSN 0733-9364
Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.
Kazar, G; Mutlu, U and Tokdemir, O B (2023) Development of zero-based budgeting approach for multinational construction contractors. Engineering, Construction and Architectural Management, 30(10), pp. 5217-5232. ISSN 0969-9988
Kazaz, A and Birgonul, M T (2005) Determination of quality level in mass housing projects in Turkey. Journal of Construction Engineering and Management, 131(2), pp. 195-202. ISSN 0733-9364
Keane, C (2012) Essays in social policy and labour economics. PhD thesis, University College Dublin, Ireland.
Kebriyaii, O; Heidari, A; Khalilzadeh, M and Pamucar, D (2025) A green project scheduling with material ordering problem considering cost constraints and quality of materials. Engineering, Construction and Architectural Management, 32(8), pp. 4991-5018. ISSN 0969-9988
Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.
Keeter, E H (1985) The development of a task inventory for baccalaureate programs in construction management (education, curriculum). PhD thesis, Texas A&M University, USA.
Kehily, D (2016) Leveraging building information modelling to address the barriers that prevent the widespread adoption of life cycle costing by quantity surveyors. PhD thesis, University of Salford, UK.
Keller, E C (1999) Prevailing wage rates: The effects on school construction, levels of taxation, and state reimbursements. DEd thesis, Pennsylvania State University, USA.
Kelley, M N (1991) Ft. Drum estimating and bidding from contractor's point of view. Journal of Construction Engineering and Management, 117(3), pp. 565-571. ISSN 0733-9364
Kelso M, R (2003) Automated commissioning of HVAC systems using first principle models. PhD thesis, Loughborough University, UK.
Kempton, J (2006) The potential for lean thinking in the refurbishment and repair of dwellings in the registered social landlord sector. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Kempton, J; Chapman, K and Alani, A M (2002) Surveyor element lifetime predictions and the anchoring and adjustment heuristic. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kempton, J; Nicol, S; Anumba, C J and Dickens, J (2000) Analysis of surveyor variability from data obtained from surveys of dwellings represented on video film. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Kenley, R and Wilson, O D (1986) A construction project cash flow model: an idiographic approach. Construction Management and Economics, 4(3), pp. 213-232. ISSN 01446193
Kenley, R and Wilson, O D (1989) A construction project net cash flow model. Construction Management and Economics, 7(1), pp. 3-18. ISSN 01446193
Kenley, Russell (1986) Construction project cash flow modelling. PhD thesis, University of Melbourne, Australia.
Kermanshachi, S (2016) Decision making and uncertainty analysis in success of construction projects. PhD thesis, Texas A&M University, USA.
Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction. Journal of Financial Management of Property and Construction, 11(2), pp. 75-90. ISSN 1366-4387
Kern, A P; Postay, R; Schneck, E R; Mancio, M; González, M A S and Guerra, G (2021) Cost and environmental impacts reduction through building compactness. Engineering, Construction and Architectural Management, 28(4), pp. 1176-1195. ISSN 0969-9988
Kern, A P and Zuliani da Silva, L G (2025) System of rehabilitation assessment and cost comparative (SARC): Case study in abandoned buildings rehabilitation in Brazil. Architectural Engineering and Design Management, 21(1), pp. 78-97. ISSN 1745-2007
Kerns, W R (1971) Criteria for determining economic priorities in awarding sewage facility construction grants. PhD thesis, Pennsylvania State University, USA.
Keskin, B; Salman, B and Koseoglu, O (2022) Architecting a BIM-based digital twin platform for airport asset management: A model-based system engineering with sysml approach. Journal of Construction Engineering and Management, 148(5): 04022020, ISSN 0733-9364
Ketabi, A B and Heravi, G (2022) Developing a framework for evaluating construction project safety levels and optimal cost allocation to safety influential factors. Engineering, Construction and Architectural Management, 29(2), pp. 643-668. ISSN 0969-9988
Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.
Khalafallah, A and El-Rayes, K (2006) Minimizing construction-related hazards in airport expansion projects. Journal of Construction Engineering and Management, 132(6), pp. 562-572. ISSN 0733-9364
Khalafallah, A and Shalaby, Y (2019) Change orders: Automating comparative data analysis and controlling impacts in public projects. Journal of Construction Engineering and Management, 145(11): 04019064, ISSN 0733-9364
Khalfan, M M A; McDermott, P and Maqsood, T (2005) Achieving supply chain integration through demand and supply management. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Khalid, A G (1992) Hedonic price estimation of the financial impact of obsolescence on commercial property buildings. PhD thesis, University of Reading, UK.
Khalid, G (1994) Obsolescence in hedonic price estimation of the financial impact of commercial office buildings: The case of Kuala Lumpur. Construction Management and Economics, 12(1), pp. 37-44. ISSN 01446193
Khalifa, R I (2019) Evaluating project assessment techniques for high-profile transportation projects development and delivery: Case of state departments of transportation (DOTS) in the United States. PhD thesis, Portland State University, USA.
Khalife, S; Pourrahimian, E; Didluck, T and Hamzeh, F (2024) Demystifying the dynamic link between project value and design team networks: A socio-technical lean management framework. Architectural Engineering and Design Management, 20(6), pp. 1357-1380. ISSN 1745-2007
Khamkanya, T (2011) A holistic approach to workplace environments, management systems and new technologies in meeting corporate end-user requirements. PhD thesis, University of Ulster, UK.
Khamooshi, H and Cioffi, D F (2013) Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling. Journal of Construction Engineering and Management, 139(5), pp. 488-497. ISSN 0733-9364
Khan, L R (2014) Reliability estimation and risk-cost optimisation of underground pipelines. PhD thesis, University of Greenwich, UK.
Khan, Mona (2025) System of systems framework for structured risk analysis in complex engineering projects involving alliance. PhD thesis, RMIT University, Australia.
Khanam, B R (2000) Contributions of highway capital to output, cost, and productivity growth: Evidence from the Canadian goods-producing sector. PhD thesis, York University, Canada.
Khanh, K D; Minh, N V and Dinh Thuc, L (2025) Enhancing the accuracy of construction project completion estimates by incorporating updated timing-based error margins (utems). International Journal of Construction Management, 25(15), pp. 1859-1868. ISSN 1562-3599
Khanzadi, M; Sheikhkhoshkar, M and Banihashemi, S (2020) BIM applications toward key performance indicators of construction projects in Iran. International Journal of Construction Management, 20(4), pp. 305-320. ISSN 1562-3599
Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.
Khawaja, E U R and Mustapha, A (2021) Mitigating disputes and managing legal issues in the era of building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 111-130. ISSN 1823-6499
Khazaeni, G and Khazaeni, A (2026) Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm. International Journal of Building Pathology and Adaptation, 44(1), pp. 208-222. ISSN 2398-4708
Kheel, M (2024) The impact of risk and uncertainty on healthcare project delivery and its effect on intra-group conflict in the context of Saudi Arabia. PhD thesis, University of Manchester, UK.
Khodabakhshian, Ania (2023) Machine learning for risk management in construction projects. PhD thesis, Politecnico di Milano, Italy.
Khodabocus, S and Seyis, S (2024) Multi-criteria decision-making model for risk management in modular construction projects. International Journal of Construction Management, 24(2), pp. 240-250. ISSN 1562-3599
Khoo, C C (1991) Cost analysis of building design for energy conservation in singapore. PhD thesis, National University of Singapore, Singapore.
Khorrami Shad, H; Tak Wing Yiu, K; Lovreglio, R and Feng, Z (2024) State-of-the-art analysis of the integration of augmented reality with construction technologies to improve construction safety. Smart and Sustainable Built Environment, 13(6), pp. 1434-1449. ISSN 2046-6099
Khosrowshahi, F (1996) Value profile analysis of contruction projects. Journal of Financial Management of Property and Construction, 1(1), pp. 55-76. ISSN 1366-4387
Khosrowshahi, F (2001) Project cash flow forecasting: A mathematical approach. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Khoza, R B M (2021) Performance measurements on concession periods to forecast water infrastructure investment returns. PhD thesis, Walden University, USA.
Khuncumchoo, N (2007) Roof maintenance record analysis toward proactive maintenance policies. PhD thesis, Georgia Institute of Technology, USA.
Kian Manesh Rad, E (2016) Development of a project complexity assessment method for energy megaprojects. PhD thesis, Heriot-Watt University, UK.
Kikuchi, S; Kronprasert, N and Easa, S M (2012) Aggregate blending using fuzzy optimization. Journal of Construction Engineering and Management, 138(12), pp. 1411-1420. ISSN 0733-9364
Killingsworth, J and Mehany, M H (2018) Implications of collection period variance in the construction industry. Journal of Financial Management of Property and Construction, 23(3), pp. 330-348. ISSN 1366-4387
Kim, S. and Liang, Y. (2026) Dissecting highway construction cost inflation: A two-decade analysis of inflation types using the national highway construction cost index. Journal of Construction Engineering and Management, 152(7): 04026087, ISSN 0733-9364
Kim, B; Lee, H; Park, H and Kim, H (2012) Framework for estimating greenhouse gas emissions due to asphalt pavement construction. Journal of Construction Engineering and Management, 138(11), pp. 1312-1321. ISSN 0733-9364
Kim, B; Lee, H; Park, H and Kim, H (2013) Estimation of greenhouse gas emissions from land-use changes due to road construction in the republic of Korea. Journal of Construction Engineering and Management, 139(3), pp. 339-346. ISSN 0733-9364
Kim, B C and Kim, H J (2014) Sensitivity of earned value schedule forecasting to S-curve patterns. Journal of Construction Engineering and Management, 140(7): 04014023, ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2009) Probabilistic forecasting of project duration using bayesian inference and the beta distribution. Journal of Construction Engineering and Management, 135(3), pp. 178-186. ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2011) Combination of project cost forecasts in earned value management. Journal of Construction Engineering and Management, 137(11), pp. 958-966. ISSN 0733-9364
Kim, B S and Hong, T (2012) Revised case-based reasoning model development based on multiple regression analysis for railroad bridge construction. Journal of Construction Engineering and Management, 138(1), pp. 154-162. ISSN 0733-9364
Kim, C S and Liu, L Y (2007) Cost information model for managing multiple projects. Journal of Construction Engineering and Management, 133(12), pp. 966-974. ISSN 0733-9364
Kim, C-S (2002) An information model for real-time project cost integration. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364
Kim, H (2002) Knowledge discovery and machine learning in construction project databases. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, H; Ahn, C R and Yang, K (2017) Identifying safety hazards using collective bodily responses of workers. Journal of Construction Engineering and Management, 143(2): 04016090, ISSN 0733-9364
Kim, H and Ham, Y (2021) Increasing reliability of participatory sensing for utility pole condition assessment using fuzzy inference. Journal of Construction Engineering and Management, 147(1): 0001968, ISSN 0733-9364
Kim, H; Orr, K; Shen, Z; Moon, H; Ju, K and Choi, W (2014) Highway alignment construction comparison using object-oriented 3D visualization modeling. Journal of Construction Engineering and Management, 140(10): 05014008, ISSN 0733-9364
Kim, H J (2009) The effects of risk attitude on competitive success in the construction industry. PhD thesis, Texas A&M University, USA.
Kim, H J and Reinschmidt, K F (2011) Effects of contractors' risk attitude on competition in construction. Journal of Construction Engineering and Management, 137(4), pp. 275-283. ISSN 0733-9364
Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Kim, J; Kamari, M; Lee, S and Ham, Y (2021) Large-scale visual data-driven probabilistic risk assessment of utility poles regarding the vulnerability of power distribution infrastructure systems. Journal of Construction Engineering and Management, 147(10): 04021121, ISSN 0733-9364
Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.
Kim, J J; Miller, J A and Kim, S (2020) Cost impacts of change orders due to unforeseen existing conditions in building renovation projects. Journal of Construction Engineering and Management, 146(8): 04020094, ISSN 0733-9364
Kim, J L; Greene, M and Kim, S (2014) Cost comparative analysis of a new green building code for residential project development. Journal of Construction Engineering and Management, 140(5): 05014002, ISSN 0733-9364
Kim, J M; Yum, S G; Adhikari, M D and Bae, J (2024) A LSTM algorithm-driven deep learning approach to estimating repair and maintenance costs of apartment buildings. Engineering, Construction and Architectural Management, 31(13), pp. 369-389. ISSN 0969-9988
Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kim, Jungsoo (2014) Impact of indoor environmental quality (IEQ) factors on occupant evaluation of workspaces. PhD thesis, University of Sydney, Australia.
Kim, K; Jeong, I and Cho, Y K (2023) Signal processing and alert logic evaluation for IoT-based work zone proximity safety system. Journal of Construction Engineering and Management, 149(2): 05022018, ISSN 0733-9364
Kim, K P and Park, K S (2016) Primary BIM dataset for refurbishing flood risk vulnerable housing in the UK. Built Environment Project and Asset Management, 6(4), pp. 365-378. ISSN 2044-124X
Kim, M (2017) Noncontact quality assessment of precast concrete elements using 3D laser scanning and building information modeling. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Kim, S (2008) Development of a wireless real-time productivity measurement system for rapid construction operations. PhD thesis, University of Kansas, USA.
Kim, S (2013) Hybrid EVAS-CBR system for the preliminary cost estimation of high-rise buildings. PhD thesis, University of Reading, UK.
Kim, S (2023) Disaster management and recovery: Estimating the disaster impacts on construction costs and evaluating the policy effects on disaster recovery. PhD thesis, University of Texas at Arlington, USA.
Kim, S and Hammad, A (2024) Decision support system (DSS) for selecting sustainable insulation material using Pareto search and novel fuzzy-modified technique for order of preference by similarity to ideal solution (TOPSIS) approach. International Journal of Construction Management, 24(7), pp. 734-747. ISSN 1562-3599
Kim, S; Makhmalbaf, A and Shahandashti, M (2024) Diagnosing and quantifying post-COVID-19 fluctuations in the architecture billings indices. Engineering, Construction and Architectural Management, 31(2), pp. 681-695. ISSN 0969-9988
Kim, Y W and Ballard, G (2002) Earned value method and customer earned value. Journal of Construction Research, 3(1), pp. 55-66. ISSN 1609-9451
Kim, Y W and Kim, S C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(2), pp. 163-172. ISSN 1466433X
Kim, Y-W (2002) The implications of a new production paradigm for project cost control. PhD thesis, University of California, Berkeley, USA.
Kim, Yong-Su (1994) The development and application of a probabilistic model for risk analysis of life cycle cost predictions: For apartment buildings constructed by the Korea National Housing Corporation in Seoul, Korea. PhD thesis, University of New South Wales, Australia.
Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building. PhD thesis, University of Liverpool, UK.
Kirkham, R J and Boussabaine, A H (2005) Forecasting the residual service life of nhs hospital buildings: A stochastic approach. Construction Management and Economics, 23(5), pp. 521-529. ISSN 01446193
Kirkham, R J; Halim Boussabaine, A and Kirkham, M P (2002) Stochastic time series forecasting of electricity costs in an nhs acute care hospital building, for use in whole life cycle costing. Engineering, Construction and Architectural Management, 9(1), pp. 38-52. ISSN 0969-9988
Kishk, M; Al-Hajj, A and Pollock, R (2003) Effective measurement and visualization of whole-life costs of building elements. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Kishk, M; Al-Hajj, A; Pollock, R and Aouad, G F (2003) Effective feedback of whole-life data to the design process. Journal of Financial Management of Property and Construction, 8(2), pp. 89-98. ISSN 1366-4387
Kishk, M; Pollock, R and Okhuahesogie, E (2004) Sensitivity of simulated whole-life costs to input probability distributions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kisi, K P (2015) Estimation of optimal productivity in labor-intensive construction operations. PhD thesis, University of Nebraska - Lincoln, USA.
Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2017) Optimal productivity in labor-intensive construction operations: Pilot study. Journal of Construction Engineering and Management, 143(3): 04016107, ISSN 0733-9364
Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2018) Estimation of optimal productivity in labor-intensive construction operations: Advanced study. Journal of Construction Engineering and Management, 144(10): 04018097, ISSN 0733-9364
Kissi, E; Adjei-Kumi, T; Amoah, P and Gyimah, J (2018) Forecasting construction tender price index in Ghana using autoregressive integrated moving average with exogenous variables model. Construction Economics and Building, 18(1), pp. 70-82. ISSN 2204-9029
Kittinaraporn, W; Tuprakay, S and Prasittisopin, L (2022) Effective modeling for construction activities of recycled aggregate concrete using artificial neural network. Journal of Construction Engineering and Management, 148(3): 04021206, ISSN 0733-9364
Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.
Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates. PhD thesis, Carnegie Mellon University, USA.
Kiziltas, S and Akinci, B (2009) Contextual information requirements of cost estimators from past construction projects. Journal of Construction Engineering and Management, 135(9), pp. 841-852. ISSN 0733-9364
Kleerekoper, L; van den Dobbelsteen, A A J F; Hordijk, G J; van Dorst, M J and Martin, C L (2015) Climate adaptation strategies: Achieving insight in microclimate effects of redevelopment options. Smart and Sustainable Built Environment, 4(1), pp. 110-136. ISSN 2046-6099
Knight, K and Fayek, A R (2002) Use of fuzzy logic for predicting design cost overruns on building projects. Journal of Construction Engineering and Management, 128(6), pp. 503-512. ISSN 0733-9364
Knost, Benjamin (2022) Incorporating resilience in infrastructure investment decisions: Developed framework, specifications, estimations, and evaluation. PhD thesis, Ohio State University, USA.
Ko, C H and Chung, N F (2014) Lean design process. Journal of Construction Engineering and Management, 140(6): 4014011, ISSN 0733-9364
Ko, W H (2021) View and environmental quality in buildings. PhD thesis, University of California, Berkeley, USA.
Kobeyev, S; Tokbolat, S; Nazipov, F and Satyanaga, A (2023) Design and modeling of an on-site greywater treatment system for a hotel building. International Journal of Building Pathology and Adaptation, 41(1), pp. 201-224. ISSN 23984708
Koc, K and Gurgun, A P (2022) Ambiguity factors in construction contracts entailing conflicts. Engineering, Construction and Architectural Management, 29(5), pp. 1946-1964. ISSN 0969-9988
Koc, K and Okudan, O (2021) Assessment of life cycle risks of deconstruction in urban regeneration projects. Journal of Construction Engineering and Management, 147(10): 04021137, ISSN 0733-9364
Koch, C (2012) Contested overruns and performance of offshore wind power plants. Construction Management and Economics, 30(8), pp. 609-622. ISSN 1466433X
Koch, C (2017) Reduction or revaluing in cost constrained design? -reverse innovation conceptualized. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Koch, C and Larsen, A (2018) Performance of retrofit with ICT of social housing: Proving technology optimists wrong? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Kodikara, G W (1990) Data flow in building contractor organisations. PhD thesis, Loughborough University, UK.
Kodikara, G W and McCaffer, R (1993) Flow of estimating data in Sri Lankan building contractor organizations. Construction Management and Economics, 11(5), pp. 341-346. ISSN 01446193
Kodikara, G W; Thorpe, A and McCaffer, R (1993) The use of bills of quantities in building contractor organizations. Construction Management and Economics, 11(4), pp. 261-269. ISSN 01446193
Koehn, E and Musser, K (1983) OSHA regulations effects on construction. Journal of Construction Engineering and Management, 109(2), pp. 233-244. ISSN 0733-9364
Kog, F and Yaman, H (2016) A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(6), pp. 709-726. ISSN 0969-9988
Kohn, M J (1970) The stock of unfinished construction in the USSR, 1950-1965: An efficiency problem in a centrally planned economy. PhD thesis, Yale University, USA.
Koirala, M P; Thapa, N; Giri, O P and Sha, R K (2025) Evaluation of variation orders on road construction projects in rural Nepal. Construction Economics and Building, 25(3-4), pp. 311-338. ISSN 2204-9029
Kometa, S T; Olomolaiye, P O and Harris, F C (1994) Attributes of UK construction clients influencing project consultants' performance. Construction Management and Economics, 12(5), pp. 433-443. ISSN 01446193
Kong, D; Tiong, R L K; Cheah, C Y J; Permana, A and Ehrlich, M (2008) Assessment of credit risk in project finance. Journal of Construction Engineering and Management, 134(11), pp. 876-884. ISSN 0733-9364
Kong, J S (2001) Lifetime maintenance strategies for deteriorating structures. PhD thesis, University of Colorado at Boulder, USA.
Konior, J and Szóstak, M (2023) Course of planned, actual and earned cost curves of diverse construction investments. International Journal of Construction Management, 23(5), pp. 865-876. ISSN 1562-3599
Koo, D H (2007) Development of sustainability assessment model for underground infrastructure. PhD thesis, Arizona State University, USA.
Koo, H J; Kelly, D and Deman, D (2024) Risk assessment of the challenges in the adaptive reuse of historic buildings. Journal of Construction Engineering and Management, 150(9): 04024119, ISSN 0733-9364
Korishetti, A. C. and Malemath, V. S. (2026) Optimal block search mechanism using deep recurrent neural network for enabling the code-efficiency in hevc. Journal of Engineering, Design and Technology, 24(4), pp. 35-62. ISSN 1726-0531
Koskela, L (2003) Is structural change the primary solution to the problems of construction? Building Research & Information, 31(2), pp. 85-96. ISSN 0961-3218
Koskela, L J (2000) An exploration towards a production theory and its application to construction. DSc(Tech) thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Koskisto, O (1997) Reliability-based optimization of plant precast concrete building systems. PhD thesis, Johns Hopkins University, USA.
Koushki, P A; Al-Rashid, K and Kartam, N (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294. ISSN 01446193
Koushki, P A and Kartam, N (2004) Impact of construction materials on project time and cost in Kuwait. Engineering, Construction and Architectural Management, 11(2), pp. 126-132. ISSN 0969-9988
Kpamma, Z E; Adjei-Kumi, T; Ayarkwa, J and Adinyira, E (2018) Choosing by advantages incorporated framework for a user-involved design process. Architectural Engineering and Design Management, 14(3), pp. 194-217. ISSN 1745-2007
Kraemer, K W (1982) An econometric analysis of residential construction in the U.S., 1964-1980. PhD thesis, State University of New York at Binghamton, USA.
Krainer, Christiane Wagner Mainardes (2021) Model of social capital accumulation in civil construction companies. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.
Krasnokutskaya, E (2003) Identification and estimation in highway procurement auctions under unobserved heterogeneity. PhD thesis, Yale University, USA.
Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.
Kuittinen, M (2016) Does the use of recycled concrete lower the carbon footprint in humanitarian construction? International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 472-488. ISSN 1759-5916
Kulshrestha, M (1997) Total Value Control in Construction through Multiple Criteria Decision Making (MCDM). PhD thesis, Indian Institute of Technology Delhi, India.
Kumar, A; Srivastava, V; Tabash, M I and Chawda, D (2022) Profitability determinants of infrastructure public private partnerships (PPPs): Empirical evidence from Indian data. Journal of Financial Management of Property and Construction, 27(1), pp. 91-111. ISSN 1366-4387
Kumar, R; Chandrashekhar, I K and Singh, S P (2017) Quantification of construction project risks by analysis of past dispute cases. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kumar, R; Iyer, K C and Singh, S P (2021) Understanding relationship between risks and claims for assessing risks with project data. Engineering, Construction and Architectural Management, 28(4), pp. 1014-1037. ISSN 0969-9988
Kumar, S; Yadav, N; Singh, M and Kachhawa, S (2019) Estimating India's commercial building stock to address the energy data challenge. Building Research & Information, 47(1), pp. 24-37. ISSN 0961-3218
Kumar, S D; Kumar, K B and Sharma, R K (2014) Delay model for dynamically switching coupled on-chip interconnects. Journal of Engineering, Design and Technology, 12(3), pp. 364-373.
Kumar Singla, H (2019) A comparative analysis of long-term performance of construction and non-construction IPOs in India: A panel data investigation. Engineering, Construction and Architectural Management, 26(10), pp. 2447-2473. ISSN 0969-9988
Kumaraswamy, M M (1997) Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 4(2), pp. 95-111. ISSN 0969-9988
Kumaraswamy, M M; Nadarajah, R; Palaneeswaran, E and Rahman, M M (2001) Dealing with delays in evaluating extensions of time. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kumari, P; Reddy, S R N and Yadav, R (2024) Indoor occupancy detection and counting system based on boosting algorithm using different sensor data. Building Research & Information, 52(1-2), pp. 87-106. ISSN 0961-3218
Kunieda, Y; Codinhoto, R and Emmitt, S (2019) Increasing the efficiency and efficacy of demolition through computerised 4D simulation. Engineering, Construction and Architectural Management, 26(10), pp. 2186-2205. ISSN 0969-9988
Kuo, S-F (1995) Decision support for irrigated project planning using a genetic algorithm. PhD thesis, Utah State University, USA.
Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.
Kuoribo, E; Yomoah, R; Owusu-Manu, D G; Acheampong, A; John Edwards, D and Debrah, C (2023) Assessing the interactive effects of the ethics of construction professionals on project performance in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 30(10), pp. 5233-5252. ISSN 0969-9988
Kurkela, M; Maksimainen, M; Julin, A; Virtanen, J P; Männistö, I; Vaaja, M T and Hyyppä, H (2022) Applying photogrammetry to reconstruct 3D luminance point clouds of indoor environments. Architectural Engineering and Design Management, 18(1), pp. 56-72. ISSN 1745-2007
Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects. PhD thesis, Heriot-Watt University, UK.
Kurniawan, F; Ogunlana, S and Motawa, I (2010) An integrated project evaluation tool for PFI seaport projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Kurniawan, F; Ogunlana, S and Motawa, I (2014) Stakeholders' expectations in utilising financial models for public-private partnership projects. Built Environment Project and Asset Management, 4(1), pp. 4-21. ISSN 2044-124X
Kuru, K and Artan, D (2020) A canvas model for risk assessment and performance estimation in public-private partnerships. International Journal of Construction Management, 20(6), pp. 704-719. ISSN 1562-3599
Kurvinen, A; Huovari, J; Lahtinen, M; Sen, T and Saari, A (2024) A dynamic model for estimating the long-term need for repairs and renovations in residential buildings. Building Research & Information, 52(5), pp. 533-550. ISSN 0961-3218
Kuttantharappel Soman, R (2020) Automated look-ahead schedule generation using linked-data based constraint checking for construction projects. PhD thesis, Imperial College London, UK.
Kuusk, K and Kalamees, T (2016) Retrofit cost-effectiveness: Estonian apartment buildings. Building Research & Information, 44(8), pp. 920-934. ISSN 0961-3218
Kwafo, D G (2021) Strategies for improving performance of project managers in Ghana to reduce delays. PhD thesis, Walden University, USA.
Kwok, T W; Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for hong kong's high-rise residential buildings: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(2), pp. 526-543. ISSN 0969-9988
Kwon, N; Cho, J; Lee, H S; Yoon, I and Park, M (2019) Compensation cost estimation model for construction noise claims using case-based reasoning. Journal of Construction Engineering and Management, 145(8): 04019047, ISSN 0733-9364
Kwon, N; Park, M; Lee, H S; Ahn, J and Kim, S (2017) Construction noise prediction model based on case-based reasoning in the preconstruction phase. Journal of Construction Engineering and Management, 143(6): 04017008, ISSN 0733-9364
Kwon, N; Park, M; Lee, H S; Ahn, J and Shin, M (2016) Construction noise management using active noise control techniques. Journal of Construction Engineering and Management, 142(7): 4016014, ISSN 0733-9364
Köseoğlu Balta, G Ç (2019) A Bayesian belief, network-based, delay risk assessment tool for tunnel projects: BBN tunnel. PhD thesis, Middle East Technical University, Turkey.
La Fleur, L (2019) Energy renovation of multi-family buildings in Sweden an evaluation of life cycle costs, indoor environment and primary energy use, and a comparison with constructing a new building. PhD thesis, Linköping University, Sweden.
Lacey, W E (1964) Change order procedures and practices in California school construction. EdD thesis, University of Southern California, USA.
Lahdenperä, P (2010) Conceptualizing a two-stage target-cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), pp. 783-796. ISSN 1466433X
Lahdenperä, P and Koppinen, T (2009) Financial analysis of road project delivery systems. Journal of Financial Management of Property and Construction, 14(1), pp. 61-78. ISSN 1366-4387
Lai, J H K (2010) Operation and maintenance budgeting for commercial buildings in Hong Kong. Construction Management and Economics, 28(4), pp. 415-427. ISSN 1466433X
Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. PhD thesis, Cardiff University, UK.
Laitinen, J (1998) Model based construction process management. PhD thesis, KTH Royal Institute of Technology, Sweden.
Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.
Lam, K C; Cheung, S O; Tang, C M and Ng, S T (2002) Capital budgeting evaluation practices of building contractors in Hong Kong. Construction Economics and Building, 2(1), pp. 81-93. ISSN 2204-9029
Lam, K C; Hu, T; Cheung, S O; Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(2), pp. 130-144. ISSN 0969-9988
Lam, K C; Ning, X and Lam, M C K (2009) Conjoining MMAS to GA to solve construction site layout planning problem. Journal of Construction Engineering and Management, 135(10), pp. 1049-1057. ISSN 0733-9364
Lam, K C; Runeson, G; Ng, S T; Hu, T S; Cheung, S O and Deng, Z M (2001) Capital budget planning practices of building contractors in Hong Kong. Construction Management and Economics, 19(6), pp. 569-576. ISSN 01446193
Lam, K C; Runeson, G; Tam, C M and Lo, S M (1998) Modelling loan acquisition decisions. Engineering, Construction and Architectural Management, 5(4), pp. 359-375. ISSN 0969-9988
Lam, K C; Thomas Ng, S; Hu, T; Skitmore, M and Cheung, S O (2000) Decision support system for contractor pre-qualification: Artificial neural network model. Engineering, Construction and Architectural Management, 7(3), pp. 251-266. ISSN 0969-9988
Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387
Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.
Lamb, S and Kwok, K C S (2017) Sopite syndrome in wind-excited buildings: Productivity and wellbeing impacts. Building Research & Information, 45(3), pp. 347-358. ISSN 0961-3218
Lambert, E L (2015) Complex factors related to capital construction project success: A case study. PhD thesis, Capella University, USA.
Lambropoulos, S; Manolopoulos, N and Pantouvakis, J P (1996) Semantic: Smart earthmoving analysis and estimation of cost. Construction Management and Economics, 14(2), pp. 79-92. ISSN 01446193
Lan, O B; Ling, F Y Y and Soo, A (2014) Information feedback and bidders' competitiveness in construction bidding. Engineering, Construction and Architectural Management, 21(5), pp. 571-585. ISSN 0969-9988
Lan, Roy Uzoma (2025) Advancing workplace safety through intelligent monitoring: Applications of artificial intelligence and computer vision in high-risk industrial environments. PhD thesis, The University of Texas at San Antonio, USA.
Langford, D A; Kennedy, P; Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(8), pp. 831-840. ISSN 01446193
Langston, C (2013) The application of data envelopment analysis to the benchmarking of construction performance in Australian and American high-rise buildings. International Journal of Construction Management, 13(3), pp. 55-75. ISSN 1562-3599
Langston, C (2014) Construction efficiency: A tale of two developed countries. Engineering, Construction and Architectural Management, 21(3), pp. 320-335. ISSN 0969-9988
Langston, C; Chan, E H W and Yung, E H K (2018) Embodied carbon and construction cost differences between Hong Kong and Melbourne buildings. Construction Economics and Building, 18(4), pp. 84-102. ISSN 2204-9029
Langston, Y L and Langston, C (2007) Building energy and cost performance: An analysis of thirty Melbourne case studies. Construction Economics and Building, 7(1), pp. 1-18. ISSN 2204-9029
Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: An analysis of 30 Melbourne case studies. Construction Management and Economics, 26(2), pp. 147-160. ISSN 1466433X
Laovisutthichai, V; Lu, W and Bao, Z (2022) Design for construction waste minimization: Guidelines and practice. Architectural Engineering and Design Management, 18(3), pp. 279-298. ISSN 1745-2007
Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.
Larew, R E (1976) A quantitative approach to estimating and pricing in a construction company. PhD thesis, University of Iowa, USA.
Larsson, N and Clark, J (2000) Incremental costs within the design process for energy efficient buildings. Building Research & Information, 28(5-6), pp. 413-418. ISSN 0961-3218
Laryea, S (2011) Quality of tender documents: Case studies from the UK. Construction Management and Economics, 29(3), pp. 275-286. ISSN 1466433X
Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(9), pp. 2060-2083. ISSN 0969-9988
Laryea, S and Watermeyer, R (2016) Early contractor involvement in framework contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 4-16. ISSN 17514304
Laryea, S A (2008) How contractors take account of risk in the tender process: Theory and practice. PhD thesis, University of Reading, UK.
Lashgari, Martin (2014) Comparative study of base-isolated and fixed-base buildings using a damage/cost approach. PhD thesis, University of Nebraska - Lincoln, USA.
Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193
Lataniotis, C (2019) Data-driven uncertainty quantification for high-dimensional engineering problems. DSc thesis, ETH Zürich, Switzerland.
Laufer, A (1987) Construction safety: Economics, information and management involvement. Construction Management and Economics, 5(1), pp. 73-90. ISSN 01446193
Laufer, A and Ledbetter, W B (1986) Assessment of safety performance measures at construction sites. Journal of Construction Engineering and Management, 112(4), pp. 530-542. ISSN 0733-9364
Laughton, C (1998) Evaluation and prediction of tunnel boring machine performance in variable rock masses. PhD thesis, University of Texas at Austin, USA.
Laura Pisello, A; Xu, X; Taylor, J E and Cotana, F (2012) Network of buildings' impact on indoor thermal performance. Smart and Sustainable Built Environment, 1(1), pp. 73-86. ISSN 2046-6099
Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599
Law, M D (2005) An investigation into the utilization of cost variance along with information technology by Pennsylvania home building firms. PhD thesis, Pennsylvania State University, USA.
Lawal, H S; Ahmadu, H A; Abdullahi, M; Yamusa, M A and Abdulrazaq, M (2023) Modeling duration of building renovation projects. Journal of Financial Management of Property and Construction, 28(3), pp. 423-438. ISSN 1366-4387
Lawal, Y S; Ibrahim, A M; Abubakar, M; Ishaq, Z H and Sa'ad, M M (2023) A simulation-based binomial model for building development appraisal. Journal of Engineering, Design and Technology, 21(1), pp. 75-107. ISSN 1726-0531
Lawther, P M and Edwards, P J (2001) Design cost modelling: the way forward. Construction Economics and Building, 1(1), pp. 32-42. ISSN 2204-9029
Lazarski, A (2014) The importance of contextual factors on the accuracy of estimates in project management: An emergence of a framework for more realistic estimation process. PhD thesis, University of Bradford, UK.
Le, A T H; Domingo, N; Rasheed, E and Park, K S (2018) Building maintenance cost planning and estimating: A literature review. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Le, A T H and Sutrisna, M (2024) Project cost control system and enabling-factors model: PLS-SEM approach and importance-performance map analysis. Engineering, Construction and Architectural Management, 31(6), pp. 2513-2535. ISSN 0969-9988
Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364
Le, C; Jeong, H D; Damnjanovic, I and Bukkapatnam, S (2022) Pareto principle in scoping-phase cost estimating: A multiobjective optimization approach for selecting and applying optimal major work items. Journal of Construction Engineering and Management, 148(8): 04022076, ISSN 0733-9364
Le, C; Le, T; Jeong, H D and Lee, E B (2019) Geographic information system-based framework for estimating and visualizing unit prices of highway work items. Journal of Construction Engineering and Management, 145(8): 04019044, ISSN 0733-9364
Le, Nguyen Tran Khoi (2019) Identification of risk factors, success practices, and feasibility of the best value approach application to improve construction performance in Vietnam and other developing countries. PhD thesis, Arizona State University, USA.
Le, Y; Wang, Y; Luo, C and Peng, Y (2013) Integration of financial and contract management on the Shanghai Expo construction program. Journal of Construction Engineering and Management, 139(6), pp. 738-748. ISSN 0733-9364
Leandro, R; O'Connor, J T and Khwaja, N (2018) Development and application of a production-rate resource for contract time determination. Journal of Construction Engineering and Management, 144(12): 06018005, ISSN 0733-9364
Ledbetter, W B (1994) Quality performance on successful project. Journal of Construction Engineering and Management, 120(1), pp. 34-46. ISSN 0733-9364
Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304
Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.
Lee, C; Hong, T; Lee, G and Jeong, J (2012) Life-cycle cost analysis on glass type of high-rise buildings for increasing energy efficiency and reducing CO2 emissions in Korea. Journal of Construction Engineering and Management, 138(7), pp. 897-904. ISSN 0733-9364
Lee, C and Park, K K H (2022) Forecasting trading volume in local housing markets through a time-series model and a deep learning algorithm. Engineering, Construction and Architectural Management, 29(1), pp. 165-178. ISSN 0969-9988
Lee, C; Won, J and Lee, E B (2018) Method for predicting raw material prices for product production over long periods. Journal of Construction Engineering and Management, 145(1): 05018017, ISSN 0733-9364
Lee, C Y-H (2010) A probabilistic approach to the life-cycle cost assessment of preventive maintenance strategies on flexible pavements. PhD thesis, University of California, Davis, USA.
Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364
Lee, E B and Ibbs, C W (2005) Computer simulation model: Construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering and Management, 131(4), pp. 449-458. ISSN 0733-9364
Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Lee, G; Lee, G; Chi, S and Oh, S (2023) Automatic classification of construction work codes in bill of quantities of national roadway based on text analysis. Journal of Construction Engineering and Management, 149(2): 04022163, ISSN 0733-9364
Lee, G and Lee, S (2022) Importance of testing with independent subjects and contexts for machine-learning models to monitor construction workers' psychophysiological responses. Journal of Construction Engineering and Management, 148(9): 04022082, ISSN 0733-9364
Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364
Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364
Lee, H W (2012) Application of target value design to energy efficiency investments. PhD thesis, University of California, Berkeley, USA.
Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.
Lee, J (2008) Dynamic project management methodology: Managing schedule compression. PhD thesis, University of Florida, USA.
Lee, J and Ham, Y (2021) Physiological sensing-driven personal thermal comfort modelling in consideration of human activity variations. Building Research & Information, 49(5), pp. 512-524. ISSN 0961-3218
Lee, J C (2010) Evaluating the sustainability of construction with recycled materials. PhD thesis, University of Wisconsin - Madison, USA.
Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988
Lee, J S (2016) Estimating cumulative damages due to disruptions in repetitive construction. Journal of Construction Engineering and Management, 142(11): 04016064, ISSN 0733-9364
Lee, J S (2021) Life cycle costing for exterior materials on building façade. Journal of Construction Engineering and Management, 147(7): 2068, ISSN 0733-9364
Lee, J S (2023) Quantifying costs of the productivity loss due to schedule changes in construction projects. Engineering, Construction and Architectural Management, 30(1), pp. 56-73. ISSN 0969-9988
Lee, J-R (1997) The object-oriented project system for pavement construction management and visualization. PhD thesis, Ohio State University, USA.
Lee, Jinwoo (2015) Joint optimization of pavement management and reconstruction policies for segment and system problems. PhD thesis, University of California, USA.
Lee, M; Jeong, J and Lee, J (2025) Development of a quantitative assessment method for occupational accident risk of construction workers using resource and cost information in the preconstruction stage. Journal of Construction Engineering and Management, 151(12): 04025208, ISSN 0733-9364
Lee, S (2001) Simulation analysis of productivity variation affected by accident risk in underground construction operations. PhD thesis, Purdue University, USA.
Lee, S (2006) Dynamic planning and control methodology: Understanding and managing iterative error and change cycles in large-scale concurrent design and construction projects. PhD thesis, Massachusetts Institute of Technology, USA.
Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.
Lee, S and Halpin, D W (2003) Predictive tool for estimating accident risk. Journal of Construction Engineering and Management, 129(4), pp. 431-436. ISSN 0733-9364
Lee, S; Tae, S; Jee, N and Shin, S (2015) LDA-based model for measuring impact of change orders in apartment projects and its application for prerisk assessment and postevaluation. Journal of Construction Engineering and Management, 141(7): 4015011, ISSN 0733-9364
Lee, S H (2010) Optimal highway investment decision-making under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.
Lee, S H; Thomas, S R and Tucker, R L (2005) Web-based benchmarking system for the construction industry. Journal of Construction Engineering and Management, 131(7), pp. 790-798. ISSN 0733-9364
Lee, S-H (2003) A process model for controlling project productivity of highway construction operations. PhD thesis, University of Florida, USA.
Lee, W (2018) Use of wearable sensors to unveil roles of task demands-personal resources and burnout on performance of construction workers. PhD thesis, University of Washington, USA.
Lee, W; Lin, K Y; Johnson, P W and Seto, E Y W (2022) Selection of wearable sensor measurements for monitoring and managing entry-level construction worker fatigue: A logistic regression approach. Engineering, Construction and Architectural Management, 29(8), pp. 2905-2923. ISSN 0969-9988
Lehtonen, J L and Kiiras, J M (2010) Cost modelling in underpinning projects. Construction Management and Economics, 28(9), pp. 985-995. ISSN 1466433X
Lei, Zhen (2015) Automated simulation model for crane motion planning in heavy industrial projects. PhD thesis, University of Alberta, Canada.
Leijten, M (2017) What lies beneath: Bounded manageability in complex underground infrastructure projects. PhD thesis, Delft University of Technology, Netherlands.
Leo, L S; Buccolieri, R and Di Sabatino, S (2018) Scale-adaptive morphometric analysis for urban air quality and ventilation applications. Building Research & Information, 46(8), pp. 931-951. ISSN 0961-3218
Leslie, S E (1997) Forecasting the funding needs of infrastructure renewal: A construction estimating technique. PhD thesis, University of Cincinnati, USA.
Lester, D and Torero, J (2019) Using megaproject performance outcomes to enhance decision-making behaviors in civil engineering graduates. Construction Economics and Building, 19(1), pp. 96-110. ISSN 2204-9029
Leu, S S; Huang, K J; Hung, C C W and Wu, P L (2024) Revolutionizing steel building project cost overrun risk assessment by Bayesian network. Engineering, Construction and Architectural Management, 31(12), pp. 4975-4987. ISSN 0969-9988
Leung, M Y; Chan, Y S; Chong, A and Sham, J F C (2008) Developing structural integrated stressor-stress models for clients' and contractors' cost engineers. Journal of Construction Engineering and Management, 134(8), pp. 635-643. ISSN 0733-9364
Leung, M Y; Chan, Y S and Yu, J (2009) Integrated model for the stressors and stresses of construction project managers in Hong Kong. Journal of Construction Engineering and Management, 135(2), pp. 126-134. ISSN 0733-9364
Leung, M Y; Liu, A M M and Wong, M M K (2006) Impact of stress-coping behaviour on estimation performance. Construction Management and Economics, 24(1), pp. 55-67. ISSN 01446193
Leung, M Y; Ng, S T; Skitmore, M and Cheung, S O (2005) Critical stressors influencing construction estimators in Hong Kong. Construction Management and Economics, 23(1), pp. 33-44. ISSN 01446193
Leung, M Y; Olomolaiye, P; Chong, A and Lam, C C Y (2005) Impacts of stress on estimation performance in Hong Kong. Construction Management and Economics, 23(9), pp. 891-903. ISSN 01446193
Leung, M Y; Skitmore, M and Chan, Y S (2007) Subjective and objective stress in construction cost estimation. Construction Management and Economics, 25(10), pp. 1063-1075. ISSN 1466433X
Leung, M Y; Yu, J and Chong, M L A (2016) Effects of stress and commitment on the performance of construction estimation participants in Hong Kong. Journal of Construction Engineering and Management, 142(2): 04015081, ISSN 0733-9364
Leung, M Y; Zhang, H and Skitmore, M (2008) Effects of organizational supports on the stress of construction estimation participants. Journal of Construction Engineering and Management, 134(2), pp. 84-93. ISSN 0733-9364
Leung, M y; Wong, M k and Oloke, D (2003) Coping behaviours of construction estimators in stress management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Levander, E and Sardén, Y (2009) Maintenance and operating costs in off-site timber framed housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Levinson, D M (1998) On whom the toll falls: A model of network financing. PhD thesis, University of California, Berkeley, USA.
Lewis, B T (1983) Building maintenance planning and estimating system. Construction Management and Economics, 1(3), pp. 217-231. ISSN 01446193
Lewis, T (1998) Electronic data interchange in the construction industry. PhD thesis, Loughborough University, UK.
Lewis, T M and Hosein, R (2006) An estimation of the size of the hidden labour force in construction in Trinidad and Tobago. Construction Management and Economics, 24(8), pp. 805-815. ISSN 1466433X
Lhee, S C; Issa, R R A and Flood, I (2012) Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks. Journal of Construction Engineering and Management, 138(1), pp. 22-30. ISSN 0733-9364
Li, H.; Wang, S.; Liu, J. and Guan, X. (2026) How the relationship quality of owner-contractor affects technological innovation performance in megaprojects: The mediating role of resource orchestration. Engineering, Construction and Architectural Management, 33(7), pp. 5155-5179. ISSN 0969-9988
Li, J. and Li, Y. (2026) A mini review of greenhouse gas emissions and mitigation strategies in the building sector. International Journal of Building Pathology and Adaptation, 44(5), pp. 1302-1328. ISSN 2398-4708
Li, M N; Wang, X; Cheng, R X and Chen, Y (2025) Aided design decision-making framework for engineering projects considering cost and social benefits. Engineering, Construction and Architectural Management, 32(8), pp. 5040-5065. ISSN 0969-9988
Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364
Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.
Li, C; Zhao, Y and Chen, W F (2024) Effects of commitment-based governance on the relationship between formal control and PPP projects performance: Mediating and moderating. Engineering, Construction and Architectural Management, 31(2), pp. 696-715. ISSN 0969-9988
Li, C Z; Gao, T; Chen, Z; Wu, H; Deng, Y; Tam, V W Y and Le, K N (2025) Exploring the power of laser scanning technology toward smart construction: Status quo, challenges, and future directions. Journal of Construction Engineering and Management, 151(7): 03125004, ISSN 0733-9364
Li, F G N; Smith, A Z P; Biddulph, P; Hamilton, I G; Lowe, R; Mavrogianni, A; Oikonomou, E; Raslan, R; Stamp, S; Stone, A; Summerfield, A J; Veitch, D; Gori, V and Oreszczyn, T (2015) Solid-wall U-values: Heat flux measurements compared with standard assumptions. Building Research & Information, 43(2), pp. 238-252. ISSN 0961-3218
Li, G; Chen, C; Zhang, G and Martek, I (2020) Bid/no-bid decision factors for Chinese international contractors in international construction projects. Engineering, Construction and Architectural Management, 27(7), pp. 1619-1643. ISSN 0969-9988
Li, H (1996) Neural network models for intelligent support of mark-up estimation. Engineering, Construction and Architectural Management, 3(1-2), pp. 69-81. ISSN 0969-9988
Li, H; Arditi, D and Wang, Z (2013) Factors that affect transaction costs in construction projects. Journal of Construction Engineering and Management, 139(1), pp. 60-68. ISSN 0733-9364
Li, H and Love, P E D (1997) Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17(2), pp. 169-176. ISSN 01446193
Li, H; Shen, L Y and Love, P E D (1999) Ann-based mark-up estimation system with self-explanatory capacities. Journal of Construction Engineering and Management, 125(3), pp. 185-189. ISSN 0733-9364
Li, H; Su, L; L.V, L and Xia, Q (2021) Detecting unbalanced bidding to achieve economic sustainability using fuzzy logic approach. Construction Innovation, 21(2), pp. 164-181. ISSN 1471-4175
Li, H; Xia, Q; Wang, L and Ma, Y (2020) Sustainability assessment of urban water environment treatment public-private partnership projects using fuzzy logic. Journal of Engineering, Design and Technology, 18(5), pp. 1251-1267. ISSN 1726-0531
Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.
Li, J; Chen, Y and Wang, H (2025) Human-machine system modeling and safety risk assessment in construction operations incorporating workers' performance variability. Journal of Construction Engineering and Management, 151(3): 04024209, ISSN 0733-9364
Li, J; Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(3), pp. 242-253. ISSN 0969-9988
Li, J; Moselhi, O and Alkass, S (2006) Forecasting project status by using fuzzy logic. Journal of Construction Engineering and Management, 132(11), pp. 1193-1202. ISSN 0733-9364
Li, M (2024) Dfma-oriented rebar design optimization for reinforced concrete structures using graph neural network. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Li, M; Allinson, D and Lomas, K (2020) Estimation of building heat transfer coefficients from in-use data: Impacts of unmonitored energy flows. International Journal of Building Pathology and Adaptation, 38(1), pp. 38-50. ISSN 23984708
Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364
Li, M; Baek, M and Ashuri, B (2021) Forecasting ratio of low bid to owner's estimate for highway construction. Journal of Construction Engineering and Management, 147(1): 04020157, ISSN 0733-9364
Li, M G; Chen, J J; Xu, A J; Xia, X H and Wang, J H (2014) Case study of innovative top-down construction method with channel-type excavation. Journal of Construction Engineering and Management, 140(5): 05014003, ISSN 0733-9364
Li, R and Roberti, R (2017) Optimal scheduling of railway track possessions in large-scale projects with multiple construction works. Journal of Construction Engineering and Management, 143(6): 04017007, ISSN 0733-9364
Li, S (2006) Three essays on bidding in the construction industry. PhD thesis, University of Utah, USA.
Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.
Li, S; Cai, H and Kamat, V R (2016) Integrating natural language processing and spatial reasoning for utility compliance checking. Journal of Construction Engineering and Management, 142(12): 04016074, ISSN 0733-9364
Li, Shuyang (2020) Proactive design approaches for energy-efficient buildings. PhD thesis, University of California, USA.
Li, W (1995) Benefit and cost analysis: Three-dimensional computer models with integrated databases in the management of construction. PhD thesis, Columbia University, USA.
Li, X; Ogier, J and Cullen, J (2006) An economic modelling approach for public sector construction workload planning. Construction Management and Economics, 24(11), pp. 1137-1147. ISSN 1466433X
Li, Y (2007) Integrated dynamic perspective on firm competencies and organizationalperformance: a study of China's largeconstruction SOEs. PhD thesis, University of Hong Kong, Hong Kong.
Li, Y (2013) Developing a sustainable construction waste estimation and management system. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Li, Y (2023) Integrated multi-stage decision-support for enhanced infrastructure restoration under uncertainty. PhD thesis, George Mason University, USA.
Li, Y and Liu, C (2010) Malmquist indices of total factor productivity changes in the Australian construction industry. Construction Management and Economics, 28(9), pp. 933-945. ISSN 1466433X
Li, Y; Liu, J; Du, X and Zhong, R Y (2025) Creating value from data resources: Research on a service ecosystem symbiosis model of digital transportation infrastructure. Journal of Construction Engineering and Management, 151(9): 05025009, ISSN 0733-9364
Li, Y and Taylor, T R B (2014) Modeling the impact of design rework on transportation infrastructure construction project performance. Journal of Construction Engineering and Management, 140(9): 04014044, ISSN 0733-9364
Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.
Liang, D; Song, L and Branham, T (2011) A task-based safety model for construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 29-40. ISSN 17514312
Liang, R; Zhang, J; Wu, C; Sheng, Z and Wang, X (2019) Joint-venture contractor selection using competitive and collaborative criteria with uncertainty. Journal of Construction Engineering and Management, 145(2): 04018123, ISSN 0733-9364
Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364
Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364
Liao, L; Man, Q; Teo, E A L; Li, L and Li, X (2014) Improving construction schedule and cost information feedback in building information modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 91-99. ISSN 17514304
Liao, P C; Shi, H; Su, Y and Luo, X (2018) Development of data-driven influence model to relate the workplace environment to human error. Journal of Construction Engineering and Management, 144(3): 04018003, ISSN 0733-9364
Liberatore, M J; Pollack-Johnson, B and Smith, C A (2001) Project management in construction: Software use and research directions. Journal of Construction Engineering and Management, 127(2), pp. 101-107. ISSN 0733-9364
Licher, Monica Katherine (2016) Estimating post-construction costs of a changing urban stormwater program. PhD thesis, Virginia Tech, USA.
Liddiard, R (2014) Room-scale profiles of space use and electricity consumption in non-domestic buildings. Building Research & Information, 42(1), pp. 72-94. ISSN 0961-3218
Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material. PhD thesis, Heriot-Watt University, UK.
Lim, B; Nepal, M P; Skitmore, M and Xiong, B (2016) Drivers of the accuracy of developers' early stage cost estimates in residential construction. Journal of Financial Management of Property and Construction, 21(1), pp. 4-20. ISSN 1366-4387
Lim, J N and Ofori, G (2007) Classification of innovation for strategic decision making in construction businesses. Construction Management and Economics, 25(9), pp. 963-978. ISSN 1466433X
Lim, J N; Schultmann, F and Ofori, G (2010) Tailoring competitive advantages derived from innovation to the needs of construction firms. Journal of Construction Engineering and Management, 136(5), pp. 568-580. ISSN 0733-9364
Lim, T; Porras-Alvarado, J D and Zhang, Z (2019) Pricing of highway infrastructure for transportation asset management. Built Environment Project and Asset Management, 9(1), pp. 64-79. ISSN 2044-124X
Lin, F.; Cheng, Y. and Zhang, J. (2026) Efficient rebar layout estimation enabled by a custom detection network and enhanced visual measurement. Journal of Construction Engineering and Management, 152(9): 04026152, ISSN 0733-9364
Lin, J J and Golparvar-Fard, M (2021) Visual and virtual production management system for proactive project controls. Journal of Construction Engineering and Management, 147(7): 2045, ISSN 0733-9364
Lind, H and Borg, L (2010) Service-led construction: Is it really the future? Construction Management and Economics, 28(11), pp. 1145-1153. ISSN 1466433X
Lind, H and Brunes, F (2014) Policies to avoid cost overruns in infrastructure projects: Critical evaluation and recommendations. Construction Economics and Building, 14(3), pp. 74-85. ISSN 2204-9029
Lind, H and Brunes, F (2015) Explaining cost overruns in infrastructure projects: A new framework with applications to Sweden. Construction Management and Economics, 33(7), pp. 554-568. ISSN 01446193
Lindelöf, D and Morel, N (2008) Bayesian estimation of visual discomfort. Building Research & Information, 36(1), pp. 83-96. ISSN 0961-3218
Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771
Ling, F Y Y (2005) Global factors affecting margin-size of construction projects. Journal of Construction Research, 6(1), pp. 91-106. ISSN 1609-9451
Ling, F Y Y; Heng, G T H; Chang-Richards, A; Chen, X and Yiu, T W (2023) Impact of digital technology adoption on the comparative advantage of architectural, engineering, and construction firms in Singapore. Journal of Construction Engineering and Management, 149(12): 04023125, ISSN 0733-9364
Ling, F Y Y and Sim, W X L (2025) Mediating role of vocational interest in the relationship between personality and job satisfaction: Insights from cost engineers. Journal of Construction Engineering and Management, 151(6): 04025057, ISSN 0733-9364
Lingard, H (1995) Safety in Hong Kong's construction industry: changing worker behaviour. PhD thesis, University of Hong Kong, Hong Kong.
Lingard, H (2000) The relationship between 'family friendly' employment practices and the well-being and satisfaction of white collar employees in the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Lingard, H; Warmerdam, A and Shooshtarian, S (2019) Getting the balance right: Regulating occupational health and safety planning and coordination in the Australian construction industry. Engineering, Construction and Architectural Management, 26(4), pp. 599-617. ISSN 0969-9988
Liou, F S and Borcherding, J D (1986) Work sampling can predict unit rate productivity. Journal of Construction Engineering and Management, 112(1), pp. 90-103. ISSN 0733-9364
Liow, K H (1998) An empirical investigation of corporate growth of property companies. Journal of Financial Management of Property and Construction, 3(3), pp. 5-16. ISSN 1366-4387
Liow, K H (2000) Corporate financial reporting of Singapore property companies: Issues and evidence. Journal of Financial Management of Property and Construction, 5(3), pp. 149-158. ISSN 1366-4387
Liu, J.; Chen, J.; Li, Y. and Zhao, K. (2026) Optimizing constrained construction crew-task assignment with grey wolf optimizer. Journal of Construction Engineering and Management, 152(8): 04026118, ISSN 0733-9364
Liu, C; AbouRizk, S; Morley, D and Lei, Z (2020) Data-driven simulation-based analytics for heavy equipment life-cycle cost. Journal of Construction Engineering and Management, 146(5): 04020038, ISSN 0733-9364
Liu, C; Itoh, Y and Dawood, N N (2001) Financial analysis on the influence of infrastructure construction on regional economic development. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Liu, C; Lyle, B and Langston, C (2003) Estimating demolition costs for single residential buildings. Construction Economics and Building, 3(2), pp. 33-42. ISSN 2204-9029
Liu, Chang (2020) Data-driven strategies to improve the construction equipment management. PhD thesis, University of Alberta, Canada.
Liu, D; Sun, J; Zhong, D and Song, L (2012) Compaction quality control of earth-rock dam construction using real-time field operation data. Journal of Construction Engineering and Management, 138(9), pp. 1085-1094. ISSN 0733-9364
Liu, H (2013) Adaptive optimization methods in system-level bridge management. PhD thesis, University of California, Berkeley, USA.
Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Liu, H; Kwigizile, V and Huang, W C (2021) Holistic framework for highway construction cost index development based on inconsistent pay items. Journal of Construction Engineering and Management, 147(7): 04021052, ISSN 0733-9364
Liu, J (2024) Value co-creation for public–private partnership (PPP) projects in China: A holistic framework from antecedents to outcomes of interaction. PhD thesis, University of Technology Sydney, Australia.
Liu, J and London, K (2011) Analysing the relationship between new housing supply and residential construction costs with the regional heterogeneities. Construction Economics and Building, 11(3), pp. 58-67. ISSN 2204-9029
Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364
Liu, J and Ma, G (2021) Study on incentive and supervision mechanisms of technological innovation in megaprojects based on the principal-agent theory. Engineering, Construction and Architectural Management, 28(6), pp. 1593-1614. ISSN 0969-9988
Liu, L and Napier, Z (2010) The accuracy of risk-based cost estimation for water infrastructure projects: Preliminary evidence from Australian projects. Construction Management and Economics, 28(1), pp. 89-100. ISSN 1466433X
Liu, L and Zhu, K (2007) Improving cost estimates of construction projects using phased cost factors. Journal of Construction Engineering and Management, 133(1), pp. 91-95. ISSN 0733-9364
Liu, Lan (2020) Design guidance and development of construction stormwater technologies. PhD thesis, Auburn University, USA.
Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.
Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment. PhD thesis, University of Michigan, USA.
Liu, M and Ling, Y Y (2005) Modeling a contractor's markup estimation. Journal of Construction Engineering and Management, 131(4), pp. 391-399. ISSN 0733-9364
Liu, M and Luo, M (2025) Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management, 32(1), pp. 621-638. ISSN 0969-9988
Liu, Q; Feng, Y; London, K and Zhang, P (2023) Influence of personal characteristics and environmental stressors on mental health for multicultural construction workplaces in Australia. Construction Management and Economics, 41(2), pp. 116-137. ISSN 01446193
Liu, Q; Ye, G and Feng, Y (2020) Workers' safety behaviors in the off-site manufacturing plant. Engineering, Construction and Architectural Management, 27(3), pp. 765-784. ISSN 0969-9988
Liu, R (2021) Impact of enhanced context-awareness for construction field crews on task cycle time. PhD thesis, Stanford University, USA.
Liu, S L; Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(4), pp. 347-353. ISSN 01446193
Liu, T; Mostafa, S; Sherif, M and Tuan Son, N (2021) Emerging themes of public-private partnership application in developing smart city projects: A conceptual framework. Built Environment Project and Asset Management, 11(1), pp. 138-156. ISSN 2044-124X
Liu, X; Xu, F; Zhang, Z and Sun, K (2025) Fall-portent detection for construction sites based on computer vision and machine learning. Engineering, Construction and Architectural Management, 32(3), pp. 1499-1521. ISSN 0969-9988
Liu, X X; Liu, H H; Yang, G L and Pan, J F (2023) Productivity assessment of the real estate industry in China: A dea-malmquist index. Engineering, Construction and Architectural Management, 30(3), pp. 1243-1270. ISSN 0969-9988
Liu, Xiaoyan (2023) The effects of public-private partnership on innovation and project performance. PhD thesis, University of Sydney, Australia.
Liu, Y (2021) From best practices to next practices: project-based learning in the development of large infrastructure. PhD thesis, Delft University of Technology, Netherlands.
Liu, Y (2023) Worker-centric human-robot co-adaptation in construction. PhD thesis, Pennsylvania State University, USA.
Liu, Y; Chang, R D; Zuo, J; Xiong, F and Dong, N (2023) What leads to the high capital cost of prefabricated construction in China: Perspectives of stakeholders. Engineering, Construction and Architectural Management, 30(2), pp. 805-832. ISSN 0969-9988
Liu, Y; Wang, X; Guo, S; Shi, X and Wang, D (2024) Analyzing the optimization of subsidies for PPP urban rail transit projects: A choice between passenger demand, vehicle kilometer, or an improved efficiency-oriented framework. Journal of Construction Engineering and Management, 150(1): 04023142, ISSN 0733-9364
Liu, Z; Wang, H and Li, H (2018) Model of equipment sharing between contractors on construction projects. Journal of Construction Engineering and Management, 144(6): 04018039, ISSN 0733-9364
Livingstone, N; Fiorentino, S and Short, M (2021) Planning for residential 'value'? London's densification policies and impacts. Buildings & Cities, 2(1), pp. 203-219. ISSN 2632-6655
Lloyd, C A (2020) Modular manufacture and construction of small nuclear power generation systems. PhD thesis, University of Cambridge, UK.
Lo, H P and Lam, M-L (2001) A bidding strategy using multivariate distribution. Journal of Financial Management of Property and Construction, 6(3), pp. 155-165. ISSN 1366-4387
Lo, Y; Zhang, C; Ye, Z and Cui, C (2023) Monitoring road base course construction progress by photogrammetry-based 3D reconstruction. International Journal of Construction Management, 23(12), pp. 2087-2101. ISSN 1562-3599
Locatelli, G and Mancini, M (2012) Looking back to see the future: Building nuclear power plants in Europe. Construction Management and Economics, 30(8), pp. 623-637. ISSN 1466433X
Lokuge, W; Gamage, N and Setunge, S (2016) Fault tree analysis method for deterioration of timber bridges using an Australian case study. Built Environment Project and Asset Management, 6(3), pp. 332-344. ISSN 2044-124X
Lombard, P C (1991) The relationship between highway infrastructure and regional economic development. PhD thesis, Purdue University, USA.
Lombardi Filho, Pedro (2022) Management of small volumes of asbestos-cement materials in Brazil: From use to waste. PhD thesis, Universidade de São Paulo, Brazil.
Loosemore, M; Braham, R; Yiming, Y and Bronkhorst, C (2020) Relational determinants of construction project outcomes: A social network perspective. Construction Management and Economics, 38(11), pp. 1061-1076. ISSN 01446193
Lopane, F D (2022) Spatial optimisation for resilient infrastructure services. PhD thesis, University of Newcastle upon Tyne, UK.
Lopes, J P; Oliveira, R A and Abreu, M I (2019) Estimating the built environment stock in Cape Verde. Engineering, Construction and Architectural Management, 26(5), pp. 814-826. ISSN 0969-9988
Lopes, M A R; Antunes, C H; Reis, A and Martins, N (2017) Estimating energy savings from behaviours using building performance simulations. Building Research & Information, 45(3), pp. 303-319. ISSN 0961-3218
Lopez, R and Love, P E D (2012) Design error costs in construction projects. Journal of Construction Engineering and Management, 138(5), pp. 585-593. ISSN 0733-9364
Lopez de Ortigosa, D A (1993) Forecasting construction costs in hyper-inflated economies. PhD thesis, University of Texas at Austin, USA.
Lorterapong, P and Moselhi, O (1996) Project-network analysis using fuzzy sets theory. Journal of Construction Engineering and Management, 122(4), pp. 308-317. ISSN 0733-9364
Lou, Y (2022) Interconnections among energy consumption, carbon emissions, and economic impacts for sustainable buildings. PhD thesis, University of Colorado at Boulder, USA.
Love, P E D (2026) Quantifying the costs of field rework in construction. Journal of Construction Engineering and Management, 152(1): 06025003, ISSN 0733-9364
Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.
Love, P E D (2025) Explaining cost overrun causation in transport projects: Drawing on evidential pluralism to develop theory. Journal of Construction Engineering and Management, 151(2): 06024003, ISSN 0733-9364
Love, P E D; Edwards, D J; Watson, H and Davis, P (2010) Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), pp. 275-282. ISSN 0733-9364
Love, P E D; Wang, X; Sing, C P and Tiong, R L K (2013) Determining the probability of project cost overruns. Journal of Construction Engineering and Management, 139(3), pp. 321-330. ISSN 0733-9364
Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida. PhD thesis, University of Florida, USA.
Lowe, D (2003) The development of early stage design cost estimating expertise: Effective feedback and systematic reflection for quantity surveyors. Journal of Financial Management of Property and Construction, 8(2), pp. 79-88. ISSN 1366-4387
Lowe, D and Skitmore, M (1994) Experiential learning in cost estimating. Construction Management and Economics, 12(5), pp. 423-431. ISSN 01446193
Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.
Lowe, D J (1998) Effective feedback and systematic reflection in design cost estimating. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Lowe, D J; Emsley, M W and Harding, A (2006) Relationships between total construction cost and project strategic, site related and building definition variable. Journal of Financial Management of Property and Construction, 11(3), pp. 165-180. ISSN 1366-4387
Lowe, D J; Emsley, M W and Harding, A (2006) Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7), pp. 750-758. ISSN 0733-9364
Lowe, D J; Emsley, M W and Harding, A (2007) Relationships between total construction cost and design related variables. Journal of Financial Management of Property and Construction, 12(1), pp. 11-24. ISSN 1366-4387
Lowe, J (1997) Labour productivity trends for the UK construction sector. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Lowe, J G (1990) The fixed capital stock in use by the UK construction industry. Construction Management and Economics, 8(1), pp. 63-75. ISSN 01446193
Loy, W. W.; Belek Fialho Teixeira, M. and Franzè, A. P. (2026) Ar-guided modular robotic bricklaying: A proof-of-concept system for human-in-the-loop construction workflows. Construction Innovation, ISSN 1471-4175
Lozon, J P (2008) Evaluating value improving practices for large scale projects. PhD thesis, University of Calgary, Canada.
Lu, H; Wang, H; Yu, D and Ye, J (2023) Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: A case study of huoshengshan and leishenshan hospital projects in wuhan. Engineering, Construction and Architectural Management, 30(8), pp. 3696-3712. ISSN 0969-9988
Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.
Lu, M (2002) Enhancing project evaluation and review technique simulation through artificial neural network-based input modeling. Journal of Construction Engineering and Management, 128(5), pp. 438-445. ISSN 0733-9364
Lu, M and Anson, M (2004) Establish concrete placing rates using quality control records from Hong Kong building construction projects. Journal of Construction Engineering and Management, 130(2), pp. 216-224. ISSN 0733-9364
Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364
Lu, R (2010) Impacts of local item dependence of testlet items with the multistage tests for pass-fail decisions. PhD thesis, University of Maryland, College Park, USA.
Lu, W; Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(1), pp. 118-132. ISSN 0969-9988
Lu, W; Webster, C; Peng, Y; Chen, X and Zhang, X (2017) Estimating and calibrating the amount of building-related construction and demolition waste in urban China. International Journal of Construction Management, 17(1), pp. 13-24. ISSN 1562-3599
Lu, Y and Zhang, J (2022) Bibliometric analysis and critical review of the research on big data in the construction industry. Engineering, Construction and Architectural Management, 29(9), pp. 3574-3592. ISSN 0969-9988
Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.
Luane Assunção Paiva, M; Clara Beatriz Ferreira de, O and Reymard Savio Sampaio de, M (2022) Allocating scarce financial resources effectively through function analysis in social housing projects. Built Environment Project and Asset Management, 12(1), pp. 96-110. ISSN 2044-124X
Lucke, T; Beecham, S and Qu, Y Y (2016) Estimating flow rates through individual outlets of siphonic roof drainage systems. Building Research & Information, 44(3), pp. 289-300. ISSN 0961-3218
Lucko, G (2011) Modeling the residual market value of construction equipment under changed economic conditions. Journal of Construction Engineering and Management, 137, pp. 806-816. ISSN 0733-9364
Lucko, G; Vorster, M C and Anderson-Cook, C M (2007) Unknown element of owning costs-impact of residual value. Journal of Construction Engineering and Management, 133(1), pp. 3-9. ISSN 0733-9364
Luczywek, Beata (2024) Essays on policy evaluations: Insights from public and labor economics. PhD thesis, University of California, San Diego, USA.
Ludlow, J E (1976) Assessment and prediction of noise from construction sites. PhD thesis, University of Southampton, UK.
Luigi, Guzzoni (2022) Construction management of cultural heritage. Conservation of cultural heritage during its construction site stage. Building information modelling supporting on site information collection and management for cost control. PhD thesis, Politecnico di Milano, Italy.
Lukito, P K (2000) A framework for environmental monitoring infrastructure investment planning in developing areas. PhD thesis, University of Wisconsin - Madison, USA.
Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work. PhD thesis, University of Michigan, USA.
Lundman, P (2011) Cost management for underground infrastructure projects a case study on cost increase and its causes. PhD thesis, Luleå University of Technology, Sweden.
Lundström, A; Savolainen, J and Kostiainen, E (2016) Case study: Developing campus spaces through co-creation. Architectural Engineering and Design Management, 12(6), pp. 409-426. ISSN 1745-2007
Luo, H (2021) Automated construction machine pose monitoring using computer vision and deep learning for construction site safety. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Luo, J; Zadeh, P and Staub-French, S (2024) Ontology-based design features for representing constructability in architectural design: Toward BIM in off-site construction. Journal of Construction Engineering and Management, 150(10): 05024010, ISSN 0733-9364
Luo, L; He, Q; Jaselskis, E J and Xie, J (2017) Construction project complexity: Research trends and implications. Journal of Construction Engineering and Management, 143(7): 04017019, ISSN 0733-9364
Luo, L; Wu, X; Hong, J and Wu, G (2022) Fuzzy cognitive map-enabled approach for investigating the relationship between influencing factors and prefabricated building cost considering dynamic interactions. Journal of Construction Engineering and Management, 148(9): 04022081, ISSN 0733-9364
Luong Hai, N and Tuan, N A (2023) Modeling of planning function management in Vietnam's public construction works. Built Environment Project and Asset Management, 13(2), pp. 201-216. ISSN 2044-124X
Lusby, A K (2003) The effect of increased public investment in transportation infrastructure on oklahoma's economic development. PhD thesis, Oklahoma State University, USA.
Luu, C; von Meding, J K and Kanjanabootra, S (2017) Balancing costs and benefits in Vietnam's hydropower industry: A strategic proposal. International Journal of Disaster Resilience in the Built Environment, 8(1), pp. 27-39. ISSN 1759-5916
Luu, D and Sher, W (2006) Construction tender subcontract selection using case-based reasoning. Construction Economics and Building, 6(2), pp. 32-43. ISSN 2204-9029
Luu, T V; Kim, S Y; Cao, H L and Park, Y M (2008) Performance measurement of construction firms in developing countries. Construction Management and Economics, 26(4), pp. 373-386. ISSN 1466433X
Ly, E; Anumba, C J and Carrillo, P M (2005) Knowledge management practices of construction project managers. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Lyu, K Y (1989) Internationalisation of Korean industry: A study of the performance of the plant and construction industry. PhD thesis, University of Manchester, UK.
Lühr, G J; Bosch-Rekveldt, M and Radujković, M (2023) The last-planner-system's impact on project culture. Journal of Engineering, Design and Technology, 21(5), pp. 1303-1322. ISSN 1726-0531
Ma, L and Fu, H (2020) Exploring the influence of project complexity on the mega construction project success: A qualitative comparative analysis (QCA) method. Engineering, Construction and Architectural Management, 27(9), pp. 2429-2449. ISSN 0969-9988
Ma, M; Tam, V W Y; Le, K N and Osei-Kyei, R (2024) A systematic literature review on price forecasting models in construction industry. International Journal of Construction Management, 24(11), pp. 1191-1200. ISSN 1562-3599
Ma, Q; Li, S and Cheung, S O (2022) Unveiling embedded risks in integrated project delivery. Journal of Construction Engineering and Management, 148(1): 04021180, ISSN 0733-9364
Ma, S; Li, Z and Shen, Y (2025) Decision-making framework for selecting sustainable prefabricated residential building technology schemes under minimum assembly rate constraints. Journal of Construction Engineering and Management, 151(8): 04025100, ISSN 0733-9364
MacArulla, M; Forcada, N; Casals, M; Gangolells, M; Fuertes, A and Roca, X (2013) Standardizing housing defects: Classification, validation, and benefits. Journal of Construction Engineering and Management, 139(8), pp. 968-976. ISSN 0733-9364
Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions. PhD thesis, University of Bath, UK.
Macdonald, R N (2013) A strategy for materials price risk mitigation. PhD thesis, University of Alabama, USA.
Macedo, B S and Ferreira, M L R (2023) Welder learning curves behaviour: "Focus on welding productivity with the tig process of marine platforms stainless steel pipes". Engineering, Construction and Architectural Management, 30(2), pp. 496-513. ISSN 0969-9988
Madihi, M H; Shirzadi Javid, A A and Nasirzadeh, F (2025) Enhancing risk assessment: An improved Bayesian network approach for analyzing interactions among risks. Engineering, Construction and Architectural Management, 32(3), pp. 2022-2043. ISSN 0969-9988
Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.
Maghrebi, M; Shamsoddini, A and Waller, S T (2016) Fusion-based learning approach for predicting concrete pouring productivity based on construction and supply parameters. Construction Innovation, 16(2), pp. 185-202. ISSN 1471-4175
Mahalingam, A (2006) Understanding and mitigating institutional costs on global projects. PhD thesis, Stanford University, USA.
Mahamid, I (2011) Early cost estimating for road construction projects using multiple regression techniques. Construction Economics and Building, 11(4), pp. 87-101. ISSN 2204-9029
Mahamid, I (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction, 22(2), pp. 192-210. ISSN 1366-4387
Mahamid, I and Bruland, A (2012) Cost deviation in road construction projects: The case of Palestine. Construction Economics and Building, 12(1), pp. 58-71. ISSN 2204-9029
Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.
Mahdavian, A; Shojaei, A; Salem, M; Yuan, J S and Oloufa, A A (2021) Data-driven predictive modeling of highway construction cost items. Journal of Construction Engineering and Management, 147(3): 04020180, ISSN 0733-9364
Mahdavian, S; Lu, M and Pereira, E (2023) Application framework for safety-centric construction acceleration planning. Engineering, Construction and Architectural Management, 30(4), pp. 1401-1422. ISSN 0969-9988
Mahdi, H S and Carmichael, D G (2014) Optimal sharing arrangement for multiple project outcomes. Journal of Financial Management of Property and Construction, 19(3), pp. 264-280. ISSN 1366-4387
Mahdi, I M; Al-Reshaid, K and Fereig, S M (2006) Optimum house delivery decision model from the government's and recipients' point-of-view. Engineering, Construction and Architectural Management, 13(4), pp. 413-430. ISSN 0969-9988
Mahdi Hosseinian, S; Arjomand, A; Li, C Q and Zhang, G (2022) Developing a model for assessing project completion time reliability during construction using time-dependent reliability theory. Journal of Construction Engineering and Management, 148(4): 04022006, ISSN 0733-9364
Mahdi Hosseinian, S; Farahpour, E and Carmichael, D G (2020) Optimum outcome-sharing construction contracts with multiagent and multioutcome arrangements. Journal of Construction Engineering and Management, 146(7): 04020067, ISSN 0733-9364
Mahdy, M M M (2014) Applying architecture simulation tools to assess building sustainable design: adapting the Egyptian residential energy code for climate change. PhD thesis, University of Kent, UK.
Maheswari, J U; Varghese, K and Sridharan, T (2006) Application of dependency structure matrix for activity sequencing in concurrent engineering projects. Journal of Construction Engineering and Management, 132(5), pp. 482-490. ISSN 0733-9364
Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms. PhD thesis, Heriot-Watt University, UK.
Mahmoodzadeh, A; Nejati, H R; Flaih, L R; Ibrahim, H H; Alenizi, F A and Alassaf, Y (2024) A rigorous examination of twelve cutting-edge machine-learning techniques for predicting time and cost in tunneling projects. Journal of Construction Engineering and Management, 150(12): 04024176, ISSN 0733-9364
Mahmoudi, E; Stepien, M and König, M (2021) Optimisation of geotechnical surveys using a BIM-based geostatistical analysis. Smart and Sustainable Built Environment, 10(3), pp. 420-437. ISSN 2046-6099
Mahmud, A T (2021) Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling. PhD thesis, Heriot-Watt University, UK.
Mahmud, A T; Ogunlana, S O and Hong, W T (2021) Key driving factors of cost overrun in highway infrastructure projects in Nigeria: A context-based perspective. Journal of Engineering, Design and Technology, 19(6), pp. 1530-1555. ISSN 1726-0531
Mahmud, A T; Ogunlana, S O and Hong, W T (2022) Understanding the dynamics of cost overrun triggers in highway infrastructure projects in Nigeria: A systems thinking modelling approach. Journal of Financial Management of Property and Construction, 27(1), pp. 29-56. ISSN 1366-4387
Mak, M Y; Ng, S T; Chen, S E and Varnam, M (2000) The relationship between economic indicators and Bromilow's time-cost model: A pilot study. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Mak, S and Raftery, J (1992) Risk attitude and systematic bias in estimating and forecasting. Construction Management and Economics, 10(4), pp. 303-320. ISSN 01446193
Mak, S; Wong, J and Picken, D (1998) The effect on contingency allowances of using risk analysis in capital cost estimating: A Hong Kong case study. Construction Management and Economics, 16(6), pp. 615-619. ISSN 01446193
Mak, S and Wong, L (1997) Estimating using risk analysis for construction. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Mak, S W (1995) Risk analysis in construction: A paradigm shift from a hard to soft approach. Construction Management and Economics, 13(5), pp. 385-392. ISSN 01446193
Mak, S W K; Choy, L H T and ho, W K O (2008) Hedonic models, internet-based technologies, and the provision of online property appraisal. Construction Innovation, 8(2), pp. 92-105. ISSN 1471-4175
Malaeb, Z and Hamzeh, F R (2022) IPD-inspired framework for measuring stakeholder integration in public-private partnerships. Construction Innovation, 22(1), pp. 160-184. ISSN 1471-4175
Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.
Malekaee Ashtiyani, F.; Karimi Gavareshki, M. h and Gheidar-Kheljani, J. (2026) Real-time prediction of project duration deviation using CNN-LSTM-FIS. Built Environment Project and Asset Management, 16(2), pp. 304-320. ISSN 2044-124X
Malekzadeh, H; Edwards, D J and Harris, F C (2005) Simulating the ground freezing process: a decision support model. Journal of Construction Research, 6(1), pp. 107-121. ISSN 1609-9451
Maloney, W F (1990) Framework for analysis of performance. Journal of Construction Engineering and Management, 116(3), pp. 399-415. ISSN 0733-9364
Maloney, W F (2002) Construction product/service and customer satisfaction. Journal of Construction Engineering and Management, 128(6), pp. 522-529. ISSN 0733-9364
Mamantzis, Dimitrios E (2005) Successful project leadership: An analysis of the Greek construction market. PhD thesis, University College London, UK.
Manavazhi, M R (2004) Assessment of the propensity for revisions in design projects through the dichotomous characterization of designer effort. Construction Management and Economics, 22(1), pp. 47-54. ISSN 01446193
Manavazhi, M R and Xunshi, Z (2001) Productivity oriented analysis of design revisions. Construction Management and Economics, 19(4), pp. 379-391. ISSN 01446193
Mangu, S; Thillai Rajan, A and Deep, A (2021) Comparison of toll and annuity PPPs: A case study of highway projects in India. Built Environment Project and Asset Management, 11(1), pp. 103-120. ISSN 2044-124X
Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.
Mani, N; Kisi, K P; Rojas, E M and Foster, E T (2017) Estimating construction labor productivity frontier: Pilot study. Journal of Construction Engineering and Management, 143(10): 04017077, ISSN 0733-9364
Maniar, H (2020) Contingency management in Indian construction projects. Journal of Construction Business and Management, 4(2), pp. 11-24. ISSN 2521-0165
Manjia, M; Pettang, C and Abanda, F H (2011) Urban self-building labour cost modelling in Cameroon. Journal of Construction in Developing Countries, 16(2), pp. 69-90. ISSN 1823-6499
Manley, K and Marceau, J (2002) Integrated manufacturing-services businesses in the Australian building and construction sector. Construction Economics and Building, 2(1), pp. 1-12. ISSN 2204-9029
Manninen, D L (1981) Labor force migration associated with nuclear power plant construction. PhD thesis, University of Washington, USA.
Manoj, G and Shivaji, C Y (2010) Design interface management of airport projects. International Journal of Construction Management, 10(3), pp. 29-44. ISSN 1562-3599
Manrique, J D; Al-Hussein, M; Bouferguene, A; Safouhi, H and Nasseri, R (2011) Combinatorial algorithm for optimizing wood waste in framing designs. Journal of Construction Engineering and Management, 137(3), pp. 188-197. ISSN 0733-9364
Mante, J; Ndekugri, I; Ankrah, N and Hammond, F (2012) The influence of procurement methods on dispute resolution mechanism choice in construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Manu, E; Ankrah, N; Chinyio, E and Proverbs, D (2013) A cognitive approach to trust management in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 232-239. ISSN 17514312
Mao, Z (2003) Forecasting total factor productivity growth in the construction industry using neural network modelling. PhD thesis, National University of Singapore, Singapore.
Maor, I (2002) Conceptual design and selection of HVAC&r systems by combining knowledge based expert system with a building energy simulation program. PhD thesis, Drexel University, USA.
Maqsoom, A; Choudhry, R M; Umer, M and Mehmood, T (2021) Influencing factors indicating time delay in construction projects: Impact of firm size and experience. International Journal of Construction Management, 21(12), pp. 1251-1262. ISSN 1562-3599
Marchiori, Fernanda Fernandes (2009) Developing a method to prepare unit cost item nets for buildings estimating. PhD thesis, Universidade de São Paulo, Brazil.
Mardikoraem, M (2021) Essays on decision problems under uncertainty. PhD thesis, University of Wisconsin - Milwaukee, USA.
Marenjak, S (2004) A generic approach to minimising whole life costs in the building industry. PhD thesis, University of Dundee, UK.
Marinelli, M D L F N L S (2015) Non-parametric bill-of-quantities estimation of concrete road bridge superstructure: An artificial neural networks approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Marisa, A and Yusof, N A (2020) Factors influencing the performance of architects in construction projects. Construction Economics and Building, 20(3), pp. 20-36. ISSN 2204-9029
Maritz, M J and Putlitz, U (2014) Standard form construction contracts; why the need for regular changes? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599
Marmanillo, O Z (2021) Study of lean and complex adaptive mechanism to regulate the function of production planning and control in construction projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.
Marques, M; Monteiro, R and Delgado, R (2018) An improved model for seismic risk assessment in Portugal. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 70-83. ISSN 1759-5916
Marrana, T C; Silvestre, J D; De Brito, J and Gomes, R (2017) Lifecycle cost analysis of flat roofs of buildings. Journal of Construction Engineering and Management, 143(6): 04017014, ISSN 0733-9364
Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in andalusia: Application to construction and demolition waste management. Construction Management and Economics, 28(5), pp. 495-507. ISSN 1466433X
Marshall, H E (1985) A graphical approach to discounted payback. Construction Management and Economics, 3(2), pp. 105-120. ISSN 01446193
Marshall, H E (1987) Building economics in the United States. Construction Management and Economics, 5(4), ISSN 01446193
Marston, V K (1985) Interdependence of the functional element costs of buildings. PhD thesis, University of Portsmouth, UK.
Marteinsson, B (2003) Durability and the factor method of ISO 15686-1. Building Research & Information, 31(6), pp. 416-426. ISSN 0961-3218
Marteinsson, B (2005) Service life estimation in building design: A development of the factor method. PhD thesis, KTH Royal Institute of Technology, Sweden.
Martin, H; Lewis, T; Peters, E and Petersen, A (2017) Construction project delivery cloud decisionsupport model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 6-26. ISSN 17514304
Martin, H; Lewis, T M and Petersen, A (2016) Factors affecting the choice of construction project delivery in developing oil and gas economies. Architectural Engineering and Design Management, 12(3), pp. 170-188. ISSN 1745-2007
Martinez, L H (2001) A neuro-fuzzy decision support system for risk analysis of revenue-dependent infrastructure projects. PhD thesis, Purdue University, USA.
Martinez-Soto, A and Jentsch, M F (2020) A transferable energy model for determining the future energy demand and its uncertainty in a country's residential sector. Building Research & Information, 48(6), pp. 587-612. ISSN 0961-3218
Martino, Antonello (2017) The historical landscape of ports: From the definition of a methodology for the risk assessment to the identification of guidelines for port heritage preservation. PhD thesis, Politecnico di Bari, Italy.
Martínez-Carricondo, P; Carvajal-Ramírez, F; Yero-Paneque, L and Agüera-Vega, F (2020) Combination of nadiral and oblique UAV photogrammetry and HBIM for the virtual reconstruction of cultural heritage. Case study of Cortijo del Fraile in Níjar, Almería (Spain). Building Research & Information, 48(2), pp. 140-159. ISSN 0961-3218
Marzouk, M (2002) Optimizing earthmoving operations using computer simulation. PhD thesis, Concordia University, Canada.
Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175
Marzouk, M; Abdallah, M and El-Said, M (2010) Modeling microtunneling projects using computer simulation. Journal of Construction Engineering and Management, 136(6), pp. 670-682. ISSN 0733-9364
Marzouk, M and Amin, A (2013) Predicting construction materials prices using fuzzy logic and neural networks. Journal of Construction Engineering and Management, 139(9), pp. 1190-1198. ISSN 0733-9364
Marzouk, M and Ashmawy, M M (2021) Assessment of highways concrete and asphalt pavements using superiority inferiority ranking technique. Construction Innovation, 21(2), pp. 259-278. ISSN 1471-4175
Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988
Marzouk, M and Hassouna, M (2019) Quality analysis using three-dimensional modelling and image processing techniques. Construction Innovation, 19(4), pp. 614-628. ISSN 1471-4175
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
Marzouk, M and Moselhi, O (2002) Simulation optimization for earthmoving operations using genetic algorithms. Construction Management and Economics, 20(6), pp. 535-543. ISSN 01446193
Marzouk, M and Moselhi, O (2003) A decision support tool for construction bidding. Construction Innovation, 3(2), pp. 111-124. ISSN 1471-4175
Marzouk, M and Moselhi, O (2003) Object-oriented simulation model for earthmoving operations. Journal of Construction Engineering and Management, 129(2), pp. 173-181. ISSN 0733-9364
Marzouk, M and Moselhi, O (2004) Fuzzy clustering model for estimating haulers' travel time. Journal of Construction Engineering and Management, 130(6), pp. 878-886. ISSN 0733-9364
Mashamba, T (2024) A system dynamics model to enhance on-time delivery of infrastructure projects within a power utility in South Africa. PhD thesis, University of South Africa, South Africa.
Mashhadi, A H; Azad, A R G and Tavakolan, M (2023) Life cycle cost comparison of strengthening a steel bridge using post-installed shear connectors with bridge reconstruction. International Journal of Construction Management, 23(8), pp. 1311-1322. ISSN 1562-3599
Masoumi, R (2015) A framework for project portfolio formation using a hybrid of multicriteria decision-making methods. PhD thesis, Northeastern University, USA.
Masrom, M D A; Skitmore, M and Bridge, A (2013) Determinants of contractor satisfaction. Construction Management and Economics, 31(7), pp. 761-779. ISSN 1466433X
Mastrandrea, F (1991) The quantification of construction contractors' claims. PhD thesis, University of Reading, UK.
Mat Noor, Noorsidi Aizuddin (2014) Framework of whole life cycle costing for Malaysian high rise residential property development. PhD thesis, Queensland University of Technology, Australia.
Matel, E; Vahdatikhaki, F; Hosseinyalamdary, S; Evers, T and Voordijk, H (2022) An artificial neural network approach for cost estimation of engineering services. International Journal of Construction Management, 22(7), pp. 1274-1287. ISSN 1562-3599
Mater, Y; Kamel, M; Karam, A and Bakhoum, E (2023) Ann-python prediction model for the compressive strength of green concrete. Construction Innovation, 23(2), pp. 340-359. ISSN 1471-4175
Mathew, S A; Tran, D Q and Nguyen, P H D (2021) Evaluation of cost growth factors in design-build highway projects using structural equation modeling. Journal of Construction Engineering and Management, 147(7): 04021070, ISSN 0733-9364
Mathur, Sandeep (2024) Managing data science initiatives as exploratory projects : A new approach to program management. PhD thesis, University of Technology Sydney, Australia.
Matipa, W M; Cunningham, P and Naik, B (2010) Assessing the impact of new rules of cost planning on building information model (BIM) schema pertinent to quantity surveying practice. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Matipa, W M; Kelliher, D and Keane, M (2008) How a quantity surveyor can ease cost management at the design stage using a building product model. Construction Innovation, 8(3), pp. 164-181. ISSN 1471-4175
Matipa, W M; Kelliher, D and Keane, M (2009) A strategic view of ICT supported cost management for green buildings in the quantity surveying practice. Journal of Financial Management of Property and Construction, 14(1), pp. 79-89. ISSN 1366-4387
Matthews, J C (2010) Integrated, multi-attribute decision support system for the evaluation of underground utility construction methods. PhD thesis, Louisiana Tech University, USA.
Matthews, J D (1996) A project partnering approach to the main contractor - sub contractor relationship. PhD thesis, Loughborough University, UK.
Matthewson, C (1992) The relationship between tactical management and contract procurement in the North American competitive lump sum bidding process. PhD thesis, Heriot-Watt University, UK.
Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.
Maurya, K K and Biswas, A (2021) Performance assessment of governance in Indian smart city development. Smart and Sustainable Built Environment, 10(4), pp. 653-680. ISSN 2046-6099
Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(4), pp. 629-638. ISSN 1562-3599
Mayer, R H J (1982) Cost estimates from stochastic geometric programs. PhD thesis, University of Delaware, USA.
Mayo, R E (1992) Improved optimum bid markup estimation through work load related bid distribution functions. PhD thesis, Stevens Institute of Technology, USA.
Mayo, R E and Liu, G (1995) Reform agenda of Chinese construction industry. Journal of Construction Engineering and Management, 121(1), pp. 80-85. ISSN 0733-9364
Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.
Mazari, M (2014) Studying the parameters involved with modulus-based construction quality control for compaction of unbound pavement layers. PhD thesis, University of Texas at El Paso, USA.
Mañelele, I and Muya, M (2008) Risk identification on community-based construction projects in Zambia. Journal of Engineering, Design and Technology, 6(2), pp. 145-161. ISSN 1726-0531
Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.
Mbachu, A and Frei, M (2011) Diagnosing the strategic health of an organization from SWOT analysis results: Case study of the Australasian cost management profession. Construction Management and Economics, 29(3), pp. 287-303. ISSN 1466433X
Mbae, A M and Nwulu, N I (2020) Day-ahead load forecasting using improved grey Verhulst model. Journal of Engineering, Design and Technology, 18(5), pp. 1335-1348. ISSN 1726-0531
Mbaraja, T Z and Moyo, T (2025) Insights on virtual reality adoption for construction workers' training in Zimbabwe. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 103-111. ISSN 17514304
McCaffer, R (1976) Contractors' bidding behaviour and tender price prediction. PhD thesis, Loughborough University, UK.
McCaffer, R (2000) The management process within contractors' companies. DSc thesis, University of Strathclyde, UK.
McCaffer, R; McCaffrey, M J and Thorpe, A (1983) The disparity between construction cost and tender-price movements. Construction Papers, 2(2), pp. 17-27. ISSN 0144-8587
McCauley, Kathleen H (2020) Modeling construction management dynamics: A proxy estimation of percent planned complete. PhD thesis, Indiana State University, USA.
McCloughan, P (2004) Construction sector concentration: Evidence from Britain. Construction Management and Economics, 22(9), pp. 979-990. ISSN 01446193
McCord, M; Davis, P; McCord, J; Haran, M and Davison, K (2020) An exploratory investigation into the relationship between energy performance certificates and sales price: A polytomous universal model approach. Journal of Financial Management of Property and Construction, 25(2), pp. 247-271. ISSN 1366-4387
McCord, M; Davis, P T; Haran, M; McGreal, S and McIlhatton, D (2012) Spatial variation as a determinant of house price: Incorporating a geographically weighted regression approach within the Belfast housing market. Journal of Financial Management of Property and Construction, 17(1), pp. 49-72. ISSN 1366-4387
McDermot, E; Agdas, D; Rodríguez Díaz, C R; Rose, T and Forcael, E (2022) Improving performance of infrastructure projects in developing countries: An ecuadorian case study. International Journal of Construction Management, 22(13), pp. 2469-2483. ISSN 1562-3599
McDermott, P and Khalfan, M M A (2006) Achieving supply chain integration within construction industry. Construction Economics and Building, 6(2), pp. 44-54. ISSN 2204-9029
McElroy, D J and Rosenow, J (2019) Policy implications for the performance gap of low-carbon building technologies. Building Research & Information, 47(5), pp. 611-623. ISSN 0961-3218
McFarland, A E (2010) An end user approach to teaching specifications. International Journal of Construction Education and Research, 6(2), pp. 83-103. ISSN 1557-8771
McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.
McKim, R A (1990) Risk management for the construction owner. PhD thesis, University of Waterloo, Canada.
McLean, J S (2017) Navigational complexity within building codes. PhD thesis, University of Vermont and State Agricultural College, USA.
McLellan, R (1994) The use of project management procedures by construction contractors. PhD thesis, University of Strathclyde, UK.
McMahon, P; Dawood, N N and Hobbs, B (1998) The utilization of it for managing ground information and optimizing earthworks. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
McQuillen, J L and Gary Hicks, R (1987) Construction of rubber-modified asphaut pavements. Journal of Construction Engineering and Management, 113(4), pp. 537-553. ISSN 0733-9364
Md Lasa, Y; Ahmad, N and Takim, R (2015) Critical success factors in obtaining project financing for private finance initiative projects in Malaysia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Meduri, S S and Annamalai, T R (2013) Unit costs of public and PPP road projects: Evidence from India. Journal of Construction Engineering and Management, 139(1), pp. 35-43. ISSN 0733-9364
Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.
Meharie, M G; Mengesha, W J; Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(7), pp. 2836-2853. ISSN 0969-9988
Mehdipoor, A; Iordanova, I and Al-Hussein, M (2025) Enhancing the manufacturing process in light-gauge steel off-site construction using semiautomation. Journal of Construction Engineering and Management, 151(6): 04025055, ISSN 0733-9364
Mehmet, O and Yorucu, V (2008) Explosive construction in a micro-state: Environmental limit and the Bon curve: Evidence from North Cyprus. Construction Management and Economics, 26(1), pp. 79-88. ISSN 1466433X
Meiling, J H; Sandberg, M and Johnsson, H (2014) A study of a plan-do-check-act method used in less industrialized activities: Two cases from industrialized housebuilding. Construction Management and Economics, 32(1-2), pp. 109-125. ISSN 01446193
Mejia Aguilar, G (2013) Improving accuracy of project outcome predictions. PhD thesis, University of Alabama, USA.
Mejlænder-Larsen, Ø (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(4), pp. 648-667. ISSN 0969-9988
Mejía, G and Franco-Duran, D M (2017) Evidence-based improvement policies in public management: A case study of public projects in Barrancabermeja City, Colombia. Journal of Construction in Developing Countries, 22(2), pp. 55-66. ISSN 1823-6499
Melanta, S; Miller-Hooks, E and Avetisyan, H G (2013) Carbon footprint estimation tool for transportation construction projects. Journal of Construction Engineering and Management, 139(5), pp. 547-555. ISSN 0733-9364
Mello Saraiva Caldeira, L M and Brito, A (2014) Use of soil-rock mixtures in dam construction. Journal of Construction Engineering and Management, 140(8): 04014030, ISSN 0733-9364
Melo, Reymard Savio Sampaio de (2015) Guidelines for target costing introduction in the real estate products development proces. PhD thesis, Universidade Estadual de Campinas, Brazil.
Memarian, B and Mitropoulos, P (2014) Production system design for speed and reliability: A case study in concrete construction. International Journal of Construction Education and Research, 10(3), pp. 181-200. ISSN 1557-8771
Membah, J and Asa, E (2015) Estimating cost for transportation tunnel projects: A systematic literature review. International Journal of Construction Management, 15(3), pp. 196-218. ISSN 1562-3599
Membah, J F J (2016) Parametric cost estimating and risk analysis of transportation tunneling projects. PhD thesis, North Dakota State University, USA.
Memon, S A (2017) Hong Kong relational contracting : an investigation into the attitudes and behaviours of contractors' project teams. PhD thesis, University of Hong Kong, Hong Kong.
Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364
Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364
Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364
Meng X, H F (2013) The application of whole life costing in PFI/PPP projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988
Messi, Leonardo (2022) Development of a BIM-based simulator for workspace management in construction. PhD thesis, Università Politecnica delle Marche, Italy.
Metham, M and Benjaoran, V (2015) The assessment of greenhouse gas emissions for evaluating actual road construction operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Mhady, A A; Gürgün, A P; Budayan, C and Koc, K (2025) New hybrid models integrating the firefly optimization algorithm with the artificial neural networks and adaptive neuro-fuzzy inference systems to improve estimation at completion. Journal of Construction Engineering and Management, 151(11): 04025160, ISSN 0733-9364
Michael Gbolagade, O; Inimbom Walter, I and Emuze, F (2021) Towards sustainability practices deployment in building construction projects in Nigeria. Smart and Sustainable Built Environment, 10(4), pp. 759-780. ISSN 2046-6099
Michieka, N M; Razek, N H A and Gearhart, R S (2023) Modelling the impact of oil price changes and investment decisions on construction wages in the U.S. Construction Management and Economics, 41(6), pp. 500-518. ISSN 01446193
Miers, R J (2001) Critical needs in current construction management education practices: The problem solving process as related to the curriculum. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Migliaccio, G C; Guindani, M; D'Incognito, M and Zhang, L (2013) Empirical assessment of spatial prediction methods for location cost-adjustment factors. Journal of Construction Engineering and Management, 139(7), pp. 858-869. ISSN 0733-9364
Miller, D P (2009) Essays on subcontracting, competitive bidding, and dynamic housing demand. PhD thesis, University of Minnesota, USA.
Miller, L; Mannering, F and Abraham, D M (2009) Effectiveness of speed control measures on nighttime construction and maintenance projects. Journal of Construction Engineering and Management, 135(7), pp. 614-619. ISSN 0733-9364
Miller, R H (1973) Life cycle system model for estimating construction equipment ownership costs. PhD thesis, Oklahoma State University, USA.
Mills, A; Love, P E D and Williams, P (2009) Defect costs in residential construction. Journal of Construction Engineering and Management, 135(1), pp. 12-16. ISSN 0733-9364
Milošević, I; Kovačević, M and Petronijević, P (2021) Estimating residual value of heavy construction equipment using ensemble learning. Journal of Construction Engineering and Management, 147(7): 04021073, ISSN 0733-9364
Minato, T (1994) A methodology for project risk control: A work package-based approach using historical cost control data. PhD thesis, University of California, Berkeley, USA.
Minchin, R E; Thurn, S B; Ellis, R D and Lewis, D W (2013) Using contractor bid amounts to estimate the impact of night construction on cost for transportation construction. Journal of Construction Engineering and Management, 139(8), pp. 1055-1062. ISSN 0733-9364
Minchin Jr, R E; Henriquez, N R; King, A M and Lewis, D W (2010) Owners respond: Preferences for task performance, delivery systems, and quality management. Journal of Construction Engineering and Management, 136(3), pp. 283-293. ISSN 0733-9364
Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.
Miners, T W (1969) Communications and cost control in the building industry with special reference to the role of the quantity surveyor. Dr thesis, University of Pretoria, South Africa.
Mintah, K; Higgins, D and Callanan, J (2018) A real option approach for the valuation of switching output flexibility in residential property investment. Journal of Financial Management of Property and Construction, 23(2), pp. 133-151. ISSN 1366-4387
Mirshekarlou, B R (2018) An investigation of material waste management in prefabricated construction industry and developing an integrated waste management tool. PhD thesis, Middle East Technical University, Turkey.
Mirzadeh, I (2014) More roads for the money. PhD thesis, KTH Royal Institute of Technology, Sweden.
Mirzaei, J; Amiri Hanzaei, H; Khaleghi, H and Kashani, H (2024) Cost estimation models for seismic retrofit of masonry school buildings. International Journal of Construction Management, 24(8), pp. 843-853. ISSN 1562-3599
Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), pp. 26-33. ISSN 1562-3599
Misztal, G (2004) Refurbishment urgency indicators of residential buildings. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Mitchell, Z; Hildreth, J and Vorster, M (2011) Using the cumulative cost model to forecast equipment repair costs: Two different methodologies. Journal of Construction Engineering and Management, 137, pp. 817-822. ISSN 0733-9364
Mitchell Jr., Z W (1998) A statistical analysis of construction equipment repair costs using field data and the cumulative cost model. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Mitchell Jr., Zane Windsor (1998) A statistical analysis of construction equipment repair costs using field data & the cumulative cost model. PhD thesis, Virginia Tech, USA.
Mitra, A and Munir, K (2019) Influence of big data in managing cyber assets. Built Environment Project and Asset Management, 9(4), pp. 503-514. ISSN 2044-124X
Mitropoulos, P and Namboodiri, M (2011) New method for measuring the safety risk of construction activities: Task demand assessment. Journal of Construction Engineering and Management, 137(1), pp. 30-38. ISSN 0733-9364
Mmereki, D and Brouwer, D (2022) Application of innovative materials and methods in green buildings and associated occupational exposure and health of construction workers: A systematic literature review. Journal of Construction Engineering and Management, 148(8): 04022068, ISSN 0733-9364
Mofokeng, M; Alhassan, A L and Zeka, B (2024) Public-private partnerships and economic growth: A sectoral analysis from developing countries. International Journal of Construction Management, 24(10), pp. 1029-1037. ISSN 1562-3599
Mogaji, L (2019) Examining the impact of earned value management on construction project outcomes in Nigeria. PhD thesis, Capella University, USA.
Mogge Jr., J W (2004) Breaking through the first cost barriers of sustainable planning, design, and construction. PhD thesis, Georgia Institute of Technology, USA.
Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.
Mohagheghi-Fard, M N (2019) An online collaboration framework for small and medium sized enterprises in the United Kingdom construction sector. PhD thesis, University of Salford, UK.
Mohamad Karimi, S; Jamshid Mousavi, S; Kaveh, A and Afshar, A (2007) Fuzzy optimization model for earthwork allocations with imprecise parameters. Journal of Construction Engineering and Management, 133(2), pp. 181-190. ISSN 0733-9364
Mohamed, M; Abdelaty, A; Khresat, G and Abu El Rub, M (2026) Mapping the patterns of cost and time overruns in the U.S. Highway construction projects: A regional risk analysis. International Journal of Construction Management, 26(3), pp. 470-481. ISSN 1562-3599
Mohamed, Emad (2021) Decision-support system for construction risk management in onshore wind projects. PhD thesis, University of Alberta, Canada.
Mohamed, S F (2006) Improving construction site management practices through knowledge management. PhD thesis, Loughborough University, UK.
Mohamed, S Y (2020) Stochastic performance and maintenance optimization models for pavement infrastructure management. PhD thesis, Purdue University, USA.
Mohammadinia, M R (1997) Development of rational and defensible pay schedules for a performance specification using performance prediction and user and agency costs. PhD thesis, Polytechnic University, USA.
Mohammadrezaytayebi, S; Sebt, M H and Afshar, M R (2023) Introducing a system dynamic–based model of quality estimation for construction industry subcontractors' works. International Journal of Construction Management, 23(4), pp. 586-595. ISSN 1562-3599
Mohammed, A; Bahatheq, A; Ghaithan, A; Alshibani, A; Mazher, K M and Alrashidi, A (2026) Predicting schedule delays of construction projects in the oil and gas industry: Comparative study. Built Environment Project and Asset Management, 16(2), pp. 286-303. ISSN 2044-124X
Mohammed, A A and Abdul-Rahman, H (2014) Aspects of project learning in construction: A socio-technical model. Construction Innovation, 14(2), pp. 229-244. ISSN 1471-4175
Moharrami, S; Bayat, A and Abourizk, S (2022) Modeling microtunnel boring machine penetration rate using a mechanistic approach. Journal of Construction Engineering and Management, 148(11): 04022128, ISSN 0733-9364
Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364
Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.
Mohseni, Mehdi (2012) Dynamic vulnerability assessment of highway and railway bridges. PhD thesis, University of Nebraska - Lincoln, USA.
Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.
Mojtahedi, Seyed Mohammad Hossein (2014) Stakeholder attributes and approaches in natural disaster risk management in the built environment: The case of flood risk management in transport infrastructure. PhD thesis, University of Sydney, Australia.
Mok, C K; Rao Tummala, V M and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(2), pp. 161-175. ISSN 01446193
Molenaar, K; Washington, S and Diekmann, J (2000) Structural equation model of construction contract dispute potential. Journal of Construction Engineering and Management, 126(4), pp. 268-276. ISSN 0733-9364
Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364
Mollaei, A; Bachmann, C and Haas, C (2025) Evaluating the potential impact of building design strategies on material recovery during deconstruction. Journal of Construction Engineering and Management, 151(6): 04025065, ISSN 0733-9364
Momade, M H; Durdyev, S; Van Tam, N; Shahid, S; Mbachu, J and Momade, Y (2024) Factors influencing adoption of construction technologies in Vietnam's residential construction projects. International Journal of Building Pathology and Adaptation, 42(5), pp. 1002-1018. ISSN 2398-4708
Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology. DEng thesis, George Washington University, USA.
Moncaster, A; Malmqvist, T; Forman, T; Pomponi, F and Anderson, J (2022) Embodied carbon of concrete in buildings, Part 2: Are the messages accurate? Buildings & Cities, 3(1), pp. 334-355. ISSN 2632-6655
Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599
Monyane, T G (2019) "A lean-led-evaluation" of infrastructure development improvement programme in South Africa. PhD thesis, Nelson Mandela University, South Africa.
Moohialdin, A S M; Lamari, F; Miska, M and Trigunarsyah, B (2020) Construction worker productivity in hot and humid weather conditions: A review of measurement methods at task, crew and project levels. Engineering, Construction and Architectural Management, 27(1), pp. 83-108. ISSN 0969-9988
Moohialdin, A S M; Lamari, F; Miska, M and Trigunarsyah, B (2023) Proximity activity intensity identification system in hot and humid weather conditions: Development and implementation. Journal of Construction Engineering and Management, 149(12): 04023122, ISSN 0733-9364
Moore, D R (1997) An analysis of experimental data to determine the validity of aspects of tolerance requirement general theory. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Moore, J E; Kuprenas, J; Lee, J J; Gordon, P; Richardson, H and Pan, Q (2004) Cost analysis methodology for advanced treatment of stormwater: The Los Angeles case. Journal of Construction Research, 5(2), pp. 149-170. ISSN 1609-9451
Mora, R (2005) Representation and reasoning for integrated conceptual design of building structures. PhD thesis, Concordia University, Canada.
Moradi, S; Hirvonen, J and Sormunen, P (2024) A qualitative and life cycle-based study of the energy performance gap in building construction: Perspectives of Finnish project professionals and property maintenance experts. Building Research & Information, 52(5), pp. 564-576. ISSN 0961-3218
Moragane, H P M N L B; Perera, B A K S; Palihakkara, A D and Ekanayake, B (2024) Application of computer vision for construction progress monitoring: A qualitative investigation. Construction Innovation, 24(2), pp. 446-469. ISSN 1471-4175
Morais, Marcelo de (2016) Method for implementing BIM and target costing in social housing. PhD thesis, Universidade Estadual de Campinas, Brazil.
Morcous, G S L (2000) Case -based reasoning for modeling bridge deterioration. PhD thesis, Concordia University, Canada.
Moreira, Lorena Claudia de Souza (2018) The building owner's manual assisted by augmented reality. PhD thesis, Universidade Estadual de Campinas, Brazil.
Moret, Y (2011) Modeling cost and time uncertainty in rail line construction. PhD thesis, Massachusetts Institute of Technology, USA.
Moret, Y and Einstein, H H (2012) Experience in expert estimation of probabilities and correlations for rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1103-1106. ISSN 0733-9364
Moret, Y and Einstein, H H (2012) Modeling correlations in rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1075-1084. ISSN 0733-9364
Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364
Morgado, J and Neves, J (2014) Work zone planning in pavement rehabilitation: Integrating cost, duration, and user effects. Journal of Construction Engineering and Management, 140(11): 4014050, ISSN 0733-9364
Moriyani, M A; Le, C; Le, T and Pirim, H (2026) Beyond one-size-fits-all: A novel data-driven framework for quantifying bidding competition intensity in highway design-bid-build contracts. Journal of Construction Engineering and Management, 152(3): 04026006, ISSN 0733-9364
Morley, D; Lu, M and Abourizk, S (2014) Identification of invariant average weighted haul distance to simplify earthmoving simulation modeling in planning site grading operations. Journal of Construction Engineering and Management, 140(12): 04014057, ISSN 0733-9364
Morris, J (1999) Improving construction design: the lean thinking paradigm. PhD thesis, Cranfield University, UK.
Morrison, N (1984) The accuracy of quantity surveyors' cost estimating. Construction Management and Economics, 2(1), pp. 57-75. ISSN 01446193
Moscati, A and Engström, S (2019) Digitalization and industrialization: Exploration of the current and future challenges in the Swedish built environment sector. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364
Moselhi, O; Hegazy, T and Fazio, P (1991) Neural networks as tools in construction. Journal of Construction Engineering and Management, 117(4), pp. 606-625. ISSN 0733-9364
Moselhi, O; Hegazy, T and Fazio, P (1993) DBID: Analogy-based dss for bidding in construction. Journal of Construction Engineering and Management, 119(3), pp. 466-479. ISSN 0733-9364
Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175
Moselhi, O; Li, J and Alkass, S (2004) Web-based integrated project control system. Construction Management and Economics, 22(1), pp. 35-46. ISSN 01446193
Moses, T; Heesom, D and Oloke, D (2020) Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector. Journal of Engineering, Design and Technology, 18(6), pp. 1867-1888. ISSN 1726-0531
Moshtaghian, F; Golabchi, M and Noorzai, E (2020) A framework to dynamic identification of project risks. Smart and Sustainable Built Environment, 9(4), pp. 375-393. ISSN 2046-6099
Moshtaghian, F and Noorzai, E (2023) Integration of risk management within the building information modeling (BIM) framework. Engineering, Construction and Architectural Management, 30(5), pp. 1951-1977. ISSN 0969-9988
Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988
Mostafavi, A; Valentin, V; Abraham, D M and Louis, J (2012) Assessment of the productivity of nighttime asphalt paving operations. Journal of Construction Engineering and Management, 138(12), pp. 1421-1432. ISSN 0733-9364
Mostofi, F; Tokdemir, O B and Toǧan, V (2023) Comprehensive root cause analysis of construction defects using semisupervised graph representation learning. Journal of Construction Engineering and Management, 149(9): 04023079, ISSN 0733-9364
Mostofi, F; Tokdemir, O B; Toǧan, V and Arditi, D (2024) Predicting the cost of rework in high-rise buildings using graph convolutional networks. Journal of Construction Engineering and Management, 150(8): 04024085, ISSN 0733-9364
Mostofi, F; Toǧan, V; Başaǧa, H B; Çltlpltloǧlu, A and Tokdemir, O B (2023) Multiedge graph convolutional network for house price prediction. Journal of Construction Engineering and Management, 149(11): 04023112, ISSN 0733-9364
Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Mousaei, A; Taghaddos, H; Nekouvaght Tak, A; Behzadipour, S and Hermann, U (2021) Optimized mobile crane path planning in discretized polar space. Journal of Construction Engineering and Management, 147(5): 04021036, ISSN 0733-9364
Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.
Moussa, M (2022) Truck tolling for bridges in USA: A new approach for determining a fair toll policy. PhD thesis, New York University Tandon School of Engineering, USA.
Moussa, M; Ruwanpura, J and Jergeas, G (2006) Decision tree modeling using integrated multilevel stochastic networks. Journal of Construction Engineering and Management, 132(12), pp. 1254-1266. ISSN 0733-9364
Moussa, M; Ruwanpura, J and Jergeas, G (2007) CTAN for risk assessments using multilevel stochastic networks. Journal of Construction Engineering and Management, 133(1), pp. 96-101. ISSN 0733-9364
Moussa, M A E-F M (2013) Unified simulation methodology and project risk assessment framework. PhD thesis, University of Calgary, Canada.
Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988
Moussavi Nadoushani, Zahra Sadat (2018) A computational approach for estimating and minimizing construction-related and end-of-life carbon footprint of concrete structures. PhD thesis, University of New South Wales, Australia.
Moussourakis, J and Haksever, C (2010) Project compression with nonlinear cost functions. Journal of Construction Engineering and Management, 136(2), pp. 251-259. ISSN 0733-9364
Moyanga, D; Ojo, L D; Awodele, O A and Ogunsemi, D R (2025) Prioritizing the survival determinants of quantity surveying firms in economic contraction. Engineering, Construction and Architectural Management, 32(1), pp. 673-704. ISSN 0969-9988
Moyanga, Dorcas Titilayo; Ojo, Lekan Damilola and Ogunsemi, Deji Rufus (2026) Prioritizing strategies for surviving economic turbulence: Case of quantity surveying consultancy organizations in Nigeria. Journal of Construction Business and Management, 8(2), pp. 15-27. ISSN 2521-0165
Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364
Moyo, T and Chigara, B (2023) Barriers to lean construction implementation in Zimbabwe. Journal of Engineering, Design and Technology, 21(3), pp. 733-757. ISSN 1726-0531
Mselle, J and Sanga, S A (2018) Constraints facing incremental housing construction in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 23(1), pp. 1-20. ISSN 1823-6499
Mucheti, A S and Albuquerque, P J R D (2022) Influence of execution speed on displacements of soil-nailed structures with vertical face in urban areas. Journal of Construction Engineering and Management, 148(7): 04022048, ISSN 0733-9364
Mucheti, Alexsander Silva (2025) Experimental and numerical analysis of nailed soil structures in urban areas. PhD thesis, Universidade Estadual de Campinas, Brazil.
Muga, H E (2009) An integrated framework for assessing the sustainability of components that make up the built environment. PhD thesis, Michigan Technological University, USA.
Mulekezi, L (1990) The design of project estimating systems. PhD thesis, University of Birmingham, UK.
Mulholland, B and Christian, J (1999) Risk assessment in construction schedules. Journal of Construction Engineering and Management, 125(1), pp. 8-15. ISSN 0733-9364
Mun, H; Jeong, J; Jeong, J and Kumi, L (2025) Statistical hypothesis test approach considering workers' thermal comfort to determine nonworking days in different climate zones. Journal of Construction Engineering and Management, 151(9): 04025116, ISSN 0733-9364
Muniandy, Meenachi (2016) Assessing the economic impact of public investment in Malaysia: A case study on myrapid transit project using a dynamic computable general equilibrium model. PhD thesis, Monash University, Australia.
Munir, M; Kiviniemi, A; Jones, S and Finnegan, S (2021) BIM business value for asset owners: Key issues and challenges. International Journal of Building Pathology and Adaptation, 39(1), pp. 135-151. ISSN 23984708
Munns, A K and Al-Haimus, K M (2000) Estimating using cost significant global cost models. Construction Management and Economics, 18(5), pp. 575-585. ISSN 01446193
Murillo, K P; Rocha, E and Rodrigues, M F (2019) Construction sectors efficiency analysis on seven European countries. Engineering, Construction and Architectural Management, 26(8), pp. 1801-1819. ISSN 0969-9988
Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry. PhD thesis, Nottingham Trent University, UK.
Musarat, M A; Alaloul, W S and Liew, M S (2022) Inflation rate and labours' wages in construction projects: Economic relation investigation. Engineering, Construction and Architectural Management, 29(6), pp. 2461-2494. ISSN 0969-9988
Mushtaq, K A B; Hassan, M U; Ahmad, T and Choudhry, R M (2026) Impact of BIM on quality of planning and design in highway infrastructure projects: SEM-based inquiry. Journal of Construction Engineering and Management, 152(2): 04025262, ISSN 0733-9364
Musonda, I (2012) Construction health and safety (H&S) performance improvement: a client-centred model. PhD thesis, University of Johannesburg, South Africa.
Musonda, I; Lusenga, E and Okoro, C (2021) Rating and characterization of an organization's safety culture to improve performance. International Journal of Construction Management, 21(2), pp. 181-193. ISSN 1562-3599
Mustaffa, N K and Carmichael, D G (2019) Concreting operations: the relationship between unit costs and unit emissions. International Journal of Construction Management, 19(5), pp. 427-435. ISSN 1562-3599
Mustaffa, Nur Kamaliah (2018) Emissions, production and cost in construction operations. PhD thesis, University of New South Wales, Australia.
Mustapha, Z (2017) An integrated health and safety compliance model for the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Muthelo, R G (2022) An integrated decision-making model for evaluating public sector construction bids. PhD thesis, University of Johannesburg, South Africa.
Mwelu, N (2020) Compliance and regulatory framework in public procurement of public road construction projects in Uganda. PhD thesis, University of Newcastle, Australia.
Mwelu, N; Watundu, S and Moya, M (2024) Demand side perception on success factors for implementing public road construction projects. Journal of Construction in Developing Countries, 29(1), pp. 1-22. ISSN 1823-6499
Myrvang, R and Liu, C Y A (2025) Beyond traditional methods: Enhancing cost escalation forecasting in commercial construction amid economic turbulence. Journal of Construction Engineering and Management, 151(2): 04024201, ISSN 0733-9364
Müller, C C and Elzomor, M (2025) Fostering a sustainable built environment by preparing a construction engineering workforce with sustainability key performance indicators. Journal of Construction Engineering and Management, 151(6): 04025056, ISSN 0733-9364
Münster, H (2021) Future sources of competitive advantage in the German self-propelled construction equipment industry. PhD thesis, University of Gloucestershire, UK.
N, H. K. and Padala, S. P. S. (2026) A bibliometric review of digital twin-enabled technologies for construction project monitoring and control. Built Environment Project and Asset Management, 16(3), pp. 441-460. ISSN 2044-124X
Naas, J D (1990) Identifying and predicting present and future occupational competencies for commercial construction superintendents in Illinois. PhD thesis, Southern Illinois University at Carbondale, USA.
Nabawy, M and Gouda Mohamed, A (2024) Risks assessment in the construction of infrastructure projects using artificial neural networks. International Journal of Construction Management, 24(4), pp. 361-373. ISSN 1562-3599
Nabi, M A; El-Adaway, I H and Assaad, R H (2024) Modeling inflation transmission among different construction materials. Journal of Construction Engineering and Management, 150(5): 04024024, ISSN 0733-9364
Nadafi, S; Moosavirad, S H and Ariafar, S (2019) Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management, 26(9), pp. 2107-2119. ISSN 0969-9988
Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099
Naderpajouh, N; Hastak, M; Gokhale, S; Bayraktar, M E; Iyer, A and Arif, F (2015) Counterfeiting risk governance in the capital projects supply chain. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Nadhim, E A; Hon, C; Xia, B; Stewart, I and Fang, D (2018) Investigating the relationships between safety climate and safety performance indicators in retrofitting works. Construction Economics and Building, 18(2), pp. 110-129. ISSN 2204-9029
Nagashima, M; Tsuchiya, M and Asada, M (2011) Reducing the economic risk of lng tank construction under conditions of fluctuating resource prices. Journal of Construction Engineering and Management, 137(5), pp. 382-391. ISSN 0733-9364
Naghashian, M H (2015) Generalised cost benefit analysis for large infrastructure projects: the case of the Channel Tunnel rail link. PhD thesis, University of Birmingham, UK.
Naismith, N; Price, A D F; Dainty, A R J; Bryman, A; Greasley, K and Soetanto, R (2005) Engendering trust in the construction supply chain. Journal of Construction Procurement, 11(2),
Naizghi, M S (2021) Factors affecting implementation of earned value management (EVM) in construction projects. PhD thesis, Wayne State University, USA.
Naji, K K; Gunduz, M and Maki, O (2023) Development of a campus facility management operational framework using a modified Delphi method. Journal of Construction Engineering and Management, 149(7): 04023052, ISSN 0733-9364
Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364
Naji, K K; Gunduz, M and Naser, A F (2022) The effect of change-order management factors on construction project success: A structural equation modeling approach. Journal of Construction Engineering and Management, 148(9): 04022085, ISSN 0733-9364
Najjar, M K; Figueiredo, K; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Life cycle assessment methodology integrated with BIM as a decision-making tool at early-stages of building design. International Journal of Construction Management, 22(4), pp. 541-555. ISSN 1562-3599
Namini, Seyed Saeed Banihashemi (2017) Active BIM with artifical intelligence for energy optimisation in buildings. PhD thesis, University of Technology Sydney, Australia.
Nani, G; Edwards, P J; Adjei-Kumi, T; Badu, E and Amoah, P (2008) Customisation and desirable characteristics of a standard method of measurement for building works in Ghana. Construction Economics and Building, 8(2), pp. 30-40. ISSN 2204-9029
Nani, G; Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(6), pp. 754-777.
Naoum, S G (1994) Critical analysis of time and cost of management and traditional contracts. Journal of Construction Engineering and Management, 120(4), pp. 687-705. ISSN 0733-9364
Naoum, S G and Mustapha, F H (1995) Relationship between the building team, procurement methods and project performance. Journal of Construction Procurement, 1(1), pp. 50-63. ISSN 1358-9180
Narbaev, T and De Marco, A (2014) Combination of growth model and earned schedule to forecast project cost at completion. Journal of Construction Engineering and Management, 140(1): 04013038, ISSN 0733-9364
Nasereddin, M (2019) Conceptual tactical framework for optimizing whole-life cost of sustainable buildings in Jordan. PhD thesis, Loughborough University, UK.
Nasir, H; Ahmed, H; Haas, C and Goodrum, P M (2014) An analysis of construction productivity differences between Canada and the United States. Construction Management and Economics, 32(6), pp. 595-607. ISSN 01446193
Nasirzadeh, F; Kabir, H M D; Akbari, M; Khosravi, A; Nahavandi, S and Carmichael, D G (2020) ANN-based prediction intervals to forecast labour productivity. Engineering, Construction and Architectural Management, 27(9), pp. 2335-2351. ISSN 0969-9988
Nasrazadani, H; Mahsuli, M; Talebiyan, H and Kashani, H (2017) Probabilistic modeling framework for prediction of seismic retrofit cost of buildings. Journal of Construction Engineering and Management, 143(8): 04017055, ISSN 0733-9364
Nassar, K M; Gunnarsson, H G and Hegab, M Y (2005) Using weibull analysis for evaluation of cost and schedule performance. Journal of Construction Engineering and Management, 131(12), pp. 1257-1262. ISSN 0733-9364
Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364
Nassar, N and AbouRizk, S (2016) Introduction to techniques for resolving project performance contradictions. Journal of Construction Engineering and Management, 142(8): 4016027, ISSN 0733-9364
Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. PhD thesis, University of Alberta, Canada.
Naumets, S and Lu, M (2021) Investigation into explainable regression trees for construction engineering applications. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364
Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364
Navon, R (1995) Resource-based model for automatic cash-flow forecasting. Construction Management and Economics, 13(6), pp. 501-510. ISSN 01446193
Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193
Nawarathna, A.; Alwan, Z.; Gledson, B. and Fernando, N. G. (2026) An early-stage embodied carbon assessment method for the Global South: Sri Lankan case study. Built Environment Project and Asset Management, pp. 1-16. ISSN 2044-124X
Nayfeh, M (1989) A combination of cyclone and vert techniques for the management of construction projects. PhD thesis, Aston University, UK.
Ndekugri, I E (1986) Construction contract information management: an integrated systems approach. PhD thesis, Loughborough University, UK.
Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation. PhD thesis, University of Maryland, College Park, USA.
Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.
Nelms, C E; Russell, A D and Lence, B J (2007) Assessing the performance of sustainable technologies: A framework and its application. Building Research & Information, 35(3), pp. 237-251. ISSN 0961-3218
Nepal, Jaya (2015) Reliability-based performance assessment and optimum maintenance of corroded reinforced concrete structures. PhD thesis, University of Greenwich, UK.
Nepal, M P (2011) Automated extraction and querying of construction-specific design features from a building information model. PhD thesis, University of British Columbia, Canada.
Nevett Fernández, G (2020) Duration estimators and productivity metrics for highway construction. PhD thesis, University of Colorado at Boulder, USA.
Newman, P W (2015) Transport infrastructure and sustainability: A new planning and assessment framework. Smart and Sustainable Built Environment, 4(2), pp. 140-153. ISSN 2046-6099
Newman, W H (1934) The building industry and business cycles. PhD thesis, University of Chicago, USA.
Newton, L A (2004) The impact of quality on building life cycle costs. PhD thesis, University of New Brunswick, Canada.
Newton, S (1983) Analysis of construction economics: a cost simulation model. PhD thesis, University of Strathclyde, UK.
Newton, S (1991) An agenda for cost modelling research. Construction Management and Economics, 9(2), pp. 97-112. ISSN 01446193
Newton, S (1992) Methods of analysing risk exposure in the cost estimates of high quality offices. Construction Management and Economics, 10(5), pp. 431-449. ISSN 01446193
Ng, H S M N (2006) Dynamic decision support for contingency management and allocation for construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Ng, K F (2017) Sustainable housing and railway developments over space and time. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193
Ng, S T; Mak, M M Y; Skitmore, R M; Lam, K C and Varnam, M (2001) The predictive ability of bromilow's time-cost model. Construction Management and Economics, 19(2), pp. 165-173. ISSN 01446193
Ng, S T; Xie, J and Kumaraswamy, M M (2010) Simulating the effect of risks on equity return for concession-based public-private partnership projects. Engineering, Construction and Architectural Management, 17(4), pp. 352-368. ISSN 0969-9988
Ng, T; Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO 9000-based quality management systems to construction contractors. Construction Economics and Building, 8(2), pp. 23-29. ISSN 2204-9029
Nguyen, V T; Do, S T; Tran, C N N and van Pham, L (2025) Analysis of interrelationships among constructs of cost overrun causes in consortium projects between construction contractors. International Journal of Construction Management, 25(13), pp. 1596-1608. ISSN 1562-3599
Nguyen, Anh Chi (2023) Risk allocation, decision rights, and adaptive lifecycle project management practices in public-private partnership highway contracts in Australia, the Philippines, and India. PhD thesis, Virginia Tech, USA.
Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.
Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.
Nguyen, L D and Ibbs, W (2010) Case law and variations in cumulative impact productivity claims. Journal of Construction Engineering and Management, 136(8), pp. 826-833. ISSN 0733-9364
Nguyen, L D; Phan, D H and Tang, L C M (2013) Simulating construction duration for multistory buildings with controlling activities. Journal of Construction Engineering and Management, 139(8), pp. 951-959. ISSN 0733-9364
Nguyen, T; Chileshe, N; Ho, D T; Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: A typical case study of Vietnam. Built Environment Project and Asset Management, 14(2), pp. 278-295. ISSN 2044-124X
Nguyen, T Q; Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(4), pp. 704-728. ISSN 23984708
Nguyen, T T (2017) Modeling of CLT creep behavior and real-time hybrid simulation of a CLT-LiFS building. PhD thesis, University of Alabama, USA.
Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.
Nguyen Van, T; Nguyen Hieu, T and De Troyer, F (2016) Managing pile foundation and land cost for high-rise buildings in the early design stages. Architectural Engineering and Design Management, 12(3), pp. 151-169. ISSN 1745-2007
Nicholls, C and Murdoch, I J (2003) Construction industry capacity utilization and its implications. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Nikkhoo, P (2022) A systematic method to reduce the duration impact of change events on construction projects. PhD thesis, Stanford University, USA.
Niknam, M (2015) A semantics-based approach to construction cost estimating. PhD thesis, Marquette University, USA.
Nikolaidis, N and Roumboutsos, A (2013) A PPP renegotiation framework: A road concession in Greece. Built Environment Project and Asset Management, 3(2), pp. 264-278. ISSN 2044-124X
Nimcharoenwon, P and Miller, G (2001) Combating the 'sick building syndrome' by improving indoor air quality. Construction Economics and Building, 1(2), pp. 82-89. ISSN 2204-9029
Nipun, M W H; Ashik-Ur-Rahman, M; Rikta, S Y; Parven, A and Pal, I (2024) Rooftop rainwater harvesting for sustainable water usage in residential buildings for climate resilient city building: Case study of Rajshahi, Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(1), pp. 80-100. ISSN 1759-5916
Niskanen, T (1993) Accident risks and preventive measures in materials handling at construction sites. DrTech thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Nitithamyong, P and Skibniewski, M J (2011) Success factors for the implementation of web-based construction project management systems: A cross-case analysis. Construction Innovation, 11(1), pp. 14-42. ISSN 1471-4175
Niu, S and Pan, W (2016) Perspectives and practices of collaborative energy design technologies for closing the building energy performance gap. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Nixon, A M (2002) The selection of architectural firms in Indiana school construction projects. EdD thesis, Ball State University, USA.
Nizam Shaikh, R (2019) BIM-based investigation of total energy consumption in delivering buildings as a product. PhD thesis, University of Liverpool, UK.
Njoku, A I (2014) Evaluation of the impact of adherence to project governance principles on the outcome of large infrastructure projects implemented in developing economies, with Nigeria as an example. PhD thesis, University of Bradford, UK.
Nkado, R N (1991) A construction time information system for the building industry. PhD thesis, University of Reading, UK.
Nkado, R N (1992) Construction time information system for the building industry. Construction Management and Economics, 10(6), pp. 489-509. ISSN 01446193
Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Nobe, M D (1996) Decision support for real estate development cost estimating. PhD thesis, Texas A&M University, USA.
Noganta, A (2019) Key challenges faced by main contractors in coordinating the works of their subcontractors: A case study of kusile power station project. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.
Noshadravan, A; Miller, T R and Gregory, J G (2017) A lifecycle cost analysis of residential buildings including natural hazard risk. Journal of Construction Engineering and Management, 143(7): 04017017, ISSN 0733-9364
Notman, D; Norman, G; Flanagan, R and Agapiou, A (1998) A time-series analysis of UK annual and quarterly construction output data (1955-95). Construction Management and Economics, 16(4), pp. 409-416. ISSN 01446193
Nouh, A; Elkasaby, E and Hussein, K (2023) Establishment of prediction system for cost of defect liability phase in construction project. Construction Innovation, 23(2), pp. 467-486. ISSN 1471-4175
Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175
Nwagwu, C C; Akin, S and Hertwich, E G (2024) Modelling Nigerian residential dwellings: bottom-up approach and scenario analysis. Buildings & Cities, 5(1), pp. 521-539. ISSN 2632-6655
Nwazota, A (2023) Special purpose vehicle for infrastructure project financing through public private partnerships: the answer to infrastructure problems in developing countries? PhD thesis, University of Manchester, UK.
Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality. DPhil thesis, University of Johannesburg, South Africa.
Nyamagere Gladys, S; Rwelamila, P D and Gimbi, J J (2022) A conceptual framework for managing post-disaster reconstruction projects in emerging economies: The case of Angola. Built Environment Project and Asset Management, 12(2), pp. 205-222. ISSN 2044-124X
Nyqvist, Roope (2025) Data-driven transformation in construction management: From artificial intelligence to network modeling. PhD thesis, Aalto University, Finland.
O'Brien, M J and Pantouvakis, J P (1993) A new approach to the development of computer- aided estimating systems for the construction industry. Construction Management and Economics, 11(1), pp. 30-44. ISSN 01446193
O'Brien, W J (1998) Capacity costing approaches for construction supply-chain management. PhD thesis, Stanford University, USA.
O'Brien, W J and Fischer, M A (2000) Importance of capacity constraints to construction cost and schedule. Journal of Construction Engineering and Management, 126(5), pp. 366-373. ISSN 0733-9364
O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364
O'Connor, J T and Huh, Y (2006) Crew production rates for contract time estimation: Beam erection, deck, and rail of highway bridges. Journal of Construction Engineering and Management, 132(4), pp. 408-415. ISSN 0733-9364
Obaidat, Y T; Barham, W and Abu libdeh, R (2024) Development of interaction diagrams of reinforced concrete short columns strengthened by nsm-CFRP strips using finite element method. International Journal of Building Pathology and Adaptation, 42(6), pp. 1304-1327. ISSN 2398-4708
Oberlender, G D and Trost, S M (2001) Predicting accuracy of early cost estimates based on estimate quality. Journal of Construction Engineering and Management, 127(3), pp. 173-182. ISSN 0733-9364
Obi, L; Arif, M and Goulding, J (2020) Low-cost housing: A cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(6), pp. 411-425. ISSN 1745-2007
Obunwo, C U C (2016) A framework for enhancing project quality and customer satisfaction in government road construction projects in Rivers State, Nigeria. PhD thesis, University of Wolverhampton, UK.
Ochoa Franco, L A (2004) Life cycle assessment of residential buildings. PhD thesis, Carnegie Mellon University, USA.
Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.
Odewole, A O (2020) Development of a collaborative innovation management framework to assist in the utilisation of agricultural waste as building materials in Nigeria. PhD thesis, University of Salford, UK.
Odeyinka, H; Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(3), pp. 203-221. ISSN 1366-4387
Odeyinka, H A (2003) The development and validation of models for assessing risk impacts on construction cash flow forecast. PhD thesis, Glasgow Caledonian University, UK.
Odeyinka, H A (2007) Modelling risk impacts on the budgeted cost of traditionally procured building projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Odeyinka, H A; Davison, C and Olomolaiye, A (2005) An assessment of factors inhibiting designers from complying with health and safety regulations in their design. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Odeyinka, H A; Kaka, A and Marledge, R (2003) An evaluation of construction cash flow management approaches in contracting oraganizations. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Odeyinka, H A; Lowe, J and Kaka, A (2008) An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 13(1), pp. 5-17. ISSN 1366-4387
Odeyinka, H A; Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(5), pp. 423-439. ISSN 01446193
Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Odeyinka, H A and Lowe, J G (2001) An evaluation of methodological issues for assessing risk impacts on construction cash flow forecast. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Odeyinka, H A; Lowe, J G and Kaka, A P (2002) A construction cost flow risk assessment model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387
Odongo, N H and Motari, W O (2022) Consumers' perceptiveness towards store brands within supermarkets. International Journal of Construction Management, 22(13), pp. 2459-2468. ISSN 1562-3599
Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599
Odusami, K T (2003) Criteria for measuring project performance by construction professionals in Nigerian construction industry. Journal of Financial Management of Property and Construction, 8(1), pp. 39-48. ISSN 1366-4387
Oduyemi, O; Okoroh, M and Dean, A (2015) Developing an artificial neural network model for life cycle costing in buildings. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Oduyemi, O I (2015) Life cycle costing methodology for sustainable commerical office buildings. PhD thesis, University of Derby, UK.
Ofek, S (2021) Stimulating key stakeholders to promote residential green building in Israel. PhD thesis, University of Haifa, Israel.
Ofori-Boadu, A N; Bryant, D; Bock-Hyeng, C; Assefa, Z; Aryeetey, F; Munkaila, S and Fini, E (2022) Physiochemical characterization of agricultural waste biochars for partial cement replacement. International Journal of Building Pathology and Adaptation, 40(4), pp. 569-586. ISSN 23984708
Ogbu, C P and Adindu, C C (2020) Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective. Journal of Engineering, Design and Technology, 18(2), pp. 326-342. ISSN 1726-0531
Ogbu, C P and Osazuwa, E M (2024) Barriers to the growth of indigenous construction firms in Nigeria. Engineering, Construction and Architectural Management, 31(12), pp. 5106-5127. ISSN 0969-9988
Ogunbayo, B F; Ohis Aigbavboa, C; Thwala, W D and Akinradewo, O I (2022) Assessing maintenance budget elements for building maintenance management in Nigerian built environment: A Delphi study. Built Environment Project and Asset Management, 12(4), pp. 649-666. ISSN 2044-124X
Ogunlana, O (1991) Learning from experience in design cost estimating. Construction Management and Economics, 9(2), pp. 133-150. ISSN 01446193
Ogunlana, S O (1989) Accuracy in design cost estimating. PhD thesis, Loughborough University, UK.
Ogunlana, S O; Bhokha, S and Pinnemitr, N (2001) Application of artifical neural network (ANN) to forecast construction cost of buildings at the pre-design stage. Journal of Financial Management of Property and Construction, 6(3), pp. 179-192. ISSN 1366-4387
Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.
Ogunsanya, O A (2018) Integrated sustainable procurement model for the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.
Ogunseiju, O; Odeyinka, H A and Yusuf, A O (2023) Usage of building information modelling in quantity surveying firms in Nigeria. Journal of Construction Business and Management, 6(2), pp. 27-37. ISSN 2521-0165
Ogunsina, O; Ekwus Obiegbu, M and Adeniyi, O (2018) Factors confronting quantity surveying practice: The case of Nigeria. Journal of Engineering, Design and Technology, 16(5), pp. 767-782. ISSN 1726-0531
Ogwang, A (2016) Threshold-based resurfacing policies in pavement management to minimize costs and greenhouse gas emissions. PhD thesis, UniversityofCalifornia, Berkeley, USA.
Ogwueleka, A C (2025) Supply chain integration in public sector construction projects: Adoption and barriers. Construction Economics and Building, 25(3-4), pp. 272-288. ISSN 2204-9029
Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364
Ojebode, A J (2016) Public-private partnership (PPP) as a mechanism for the provision of affordable housing delivery in Nigeria. PhD thesis, University of Brighton, UK.
Ojghaz, A S and Heravi, G (2026) An integrated BIM-GIS framework for building quality assessment based on price estimation: Evaluating design and location factors. Journal of Construction Engineering and Management, 152(4): 04026020, ISSN 0733-9364
Ojo, L D; Chan, A P C and Sing, M C P (2026) Drivers of integrity-based approach to ethics management (ibaem) in the Nigerian construction organizations. International Journal of Construction Management, 26(3), pp. 396-411. ISSN 1562-3599
Ojo, A; Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in ondo state, Nigeria. Journal of Financial Management of Property and Construction, 27(1), pp. 57-75. ISSN 1366-4387
Ojo, A E; Ammasoma, D and Adelakun, J O (2023) Responsiveness of the construction sector to fiscal policy in Nigeria. Journal of Construction in Developing Countries, 28(2), pp. 121-137. ISSN 1823-6499
Ojo, E O (2019) Project managers’ capacity-planning practices for infrastructure projects in qatar. PhD thesis, Walden University, USA.
Ojo, L D and Ogunsemi, D R (2019) Critical drivers (CDs) of value management adoption in the Nigerian construction industry: A Delphi study. Journal of Engineering, Design and Technology, 17(1), pp. 250-264. ISSN 1726-0531
Ojo, L D; Ogunsemi, D R and Ogunsina, O (2022) Conceptual framework of value management adoption in the Nigerian construction industry. Construction Innovation, 22(4), pp. 939-961. ISSN 1471-4175
Ojo, S O; Adeyemi, O Y and Ikpo, I J (2000) Effects of procurement methods on clients objectives of time and cost in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 5(1-2), pp. 105-108. ISSN 1366-4387
Ojolo, S J; Damisa, O; Orisaleye, J I and Ogbonnaya, C (2010) Design and development of cashew nut shelling machine. Journal of Engineering, Design and Technology, 8(2), pp. 146-157. ISSN 1726-0531
Ok, S C and Sinha, S K (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), pp. 1029-1044. ISSN 1466433X
Okakpu, A I (2019) Investigating the effectiveness of adopting building information modelling for refurbishment of complex buildings: Case study of auckland. PhD thesis, Auckland University of Technology, New Zealand.
Okampo, E J and Nwulu, N I (2020) Optimal energy mix for a reverse osmosis desalination unit considering demand response. Journal of Engineering, Design and Technology, 18(5), pp. 1287-1303. ISSN 1726-0531
Oke, A. E.; Adekunye, O. J.; Adeosun, F. E.; Aliu, J.; Akanni, P. O.; Aghimien, D. and Aigbavboa, C. O. (2026) Assessment of the challenges of integrating cyber-physical systems in Nigerian construction. Engineering, Construction and Architectural Management, 33(4), pp. 3146-3163. ISSN 0969-9988
Oke, A E; Aliu, J O; Tamunosa Ojurongbe, E; Aigbavboa, C O; Aghimien, D O and Ebekozien, A (2026) Investigation of core and future competencies needed for quantity surveyors in Nigeria. International Journal of Construction Education and Research, 22(1), pp. 119-137. ISSN 1557-8771
Oke, A. E.; Aliu, J. O.; Timothy Jesudaju, O.; Thomas Fagbe, A.; Aghimien, D. and Aigbavboa, C. O. (2025) Building a sustainable future: The role of digitalization in Nigerian heavy engineering projects. Engineering, Construction and Architectural Management, 33(5), pp. 3957-3974. ISSN 0969-9988
Oke, A; Atofarati, J and Bello, S (2022) Awareness of 3D printing for sustainable construction in an emerging economy. Construction Economics and Building, 22(2), pp. 52-68. ISSN 2204-9029
Oke, A E; Aliu, J; Ehiosun, L U; Ebekozien, A and Rotimi, A A (2024) From hurdles to heights: Blueprint for tackling distributed ledger technology challenges in the construction sector of a developing economy. Journal of Financial Management of Property and Construction, 29(3), pp. 405-424. ISSN 1366-4387
Oke, A E; Arowoiya, V A; Chan, M and Oyediran, A (2025) Digital twin technology (DTT) in a developing construction industry: Evaluation of the awareness and usage among professionals in Nigeria. International Journal of Construction Management, 25(11), pp. 1313-1323. ISSN 1562-3599
Oke, A E; Ogunsemi, D R and Adeyelu, M (2019) Quadrant and gap analysis of required and exhibited quantity surveyors’ competencies. Journal of Engineering, Design and Technology, 17(6), pp. 1161-1173. ISSN 1726-0531
Oke, A E; Akintola, O A; Oluwatobiloba, O M; Aliu, J and Omoyajowo, N I (2025) Study on the awareness and practice of circular economy principles among construction stakeholders in Nigeria. Construction Economics and Building, 25(2), pp. 24-42. ISSN 2204-9029
Okonkwo, C; Evans, U F and Ekung, S (2023) Unearthing direct and indirect material waste-related factors underpinning cost overruns in construction projects. International Journal of Construction Management, 23(13), pp. 2298-2304. ISSN 1562-3599
Okpala, D C and Aniekwu, A N (1988) Causes of high costs of construction in Nigeria. Journal of Construction Engineering and Management, 114(2), pp. 233-244. ISSN 0733-9364
Oktora, S I; Wulansari, I Y; Siagian, T H; Laksono, B C; Sugiandewi, N N R and Anindita, N (2024) Identifying the potential participation in natural disaster insurance: First attempt based on a national socio-economic survey in Indonesia. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 177-192. ISSN 1759-5916
Okudan, O; Cevikbas, M and Işık, Z (2025) Selection framework of disruption analysis methods for megaprojects: An integrated fuzzy multi-criteria decision-making approach. Engineering, Construction and Architectural Management, 32(1), pp. 59-86. ISSN 0969-9988
Okuwoga, A A (1994) Construction cost escalation and resource planning in Nigeria: A case study of public sector housing projects 1975-90. PhD thesis, University College London, UK.
Olabanji, O M and Mpofu, K (2020) Adopting hybridized multicriteria decision model as a decision tool in engineering design. Journal of Engineering, Design and Technology, 18(2), pp. 451-479. ISSN 1726-0531
Oladapo, A A (2007) A quantitative assessment of the cost and time impact of variation orders on construction projects. Journal of Engineering, Design and Technology, 5(1), pp. 35-48. ISSN 1726-0531
Oladinrin, O T and Ojo, L D (2022) Characterisation of the drivers of environmental management system implementation. Engineering, Construction and Architectural Management, 29(10), pp. 3868-3892. ISSN 0969-9988
Oladunjoye, O A; Proverbs, D G; Collins, B and Xiao, H (2020) A cost-benefit analysis model for the retrofit of sustainable urban drainage systems towards improved flood risk mitigation. International Journal of Building Pathology and Adaptation, 38(3), pp. 423-439. ISSN 23984708
Olaniran, O J; Love, P E D; Edwards, D J; Olatunji, O and Matthews, J (2017) Chaos theory: Implications for cost overrun research in hydrocarbon megaprojects. Journal of Construction Engineering and Management, 143(2): 05016020, ISSN 0733-9364
Olatunde, N. A.; Gento, A. M.; Awodele, I. A.; Adebayo, B. O.; Makanjuola, S. S. and Oyewo, O. W. (2026) Extent of specialized software usage in the delivery of quantity surveying services in South West Nigeria. International Journal of Building Pathology and Adaptation, 44(3), pp. 740-756. ISSN 2398-4708
Olatunde, N A and Alao, O O (2017) Quantitative appraisal of cost and time performance of construction projects in public and private universities in Osun State, Nigeria. Journal of Engineering, Design and Technology, 15(5), pp. 619-634.
Olatunde, N A; Awodele, I A; Adebayo, B O and Makanjuola, S S (2025) Assessment of factors inhibiting engagement of quantity surveyors on private residential building projects in Ado-Ekiti, Nigeria. Journal of Financial Management of Property and Construction, 30(2), pp. 318-334. ISSN 1366-4387
Olatunde, N A; Ogunsemi, D R and Oke, A E (2017) Impact of team members' composition on construction projects delivery in selected higher institutions in Nigeria. Journal of Engineering, Design and Technology, 15(3), pp. 355-377.
Olatunji, O. A.; Lee, J. J. S.; Chong, H. Y. and Akanmu, A. A. (2021) Building information modelling (BIM) penetration in quantity surveying (qs) practice. Built Environment Project and Asset Management, 11(5), pp. 888-902. ISSN 2044-124X
Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), pp. 60-79. ISSN 1366-4387
Olatunji, O A (2010) The impact of oil price regimes on construction cost in Nigeria. Construction Management and Economics, 28(7), pp. 747-759. ISSN 1466433X
Olatunji, O A (2019) Promoting student commitment to BIM in construction education. Engineering, Construction and Architectural Management, 26(7), pp. 1240-1260. ISSN 0969-9988
Olatunji, O A; Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project's outturn costs. Built Environment Project and Asset Management, 8(4), pp. 358-371. ISSN 2044-124X
Olatunji, O A and Sher, W (2014) Perspectives on modelling BIM-enabled estimating practices. Construction Economics and Building, 14(4), pp. 32-53. ISSN 2204-9029
Olatunji, O A and Sher, W (2015) Estimating in geometric 3D CAD. Journal of Financial Management of Property and Construction, 20(1), pp. 24-49. ISSN 1366-4387
Olawale, Y A and Sun, M (2010) Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), pp. 509-526. ISSN 1466433X
Olayinka, R; Suresh, S and Chinyio, E (2015) Impact of knowledge management on the cost of poor quality. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(4), pp. 177-188. ISSN 17514304
Olayinka Agboola, A; Ayodele, T O and Olofa, A (2018) Tax increment financing in the UK and USA: Its prospects for urban regeneration in Nigeria. Smart and Sustainable Built Environment, 7(3-4), pp. 277-292. ISSN 2046-6099
Olbina, S (2008) Improving the delivery system for teaching the project planning and feasibility/site development course to building construction undergraduate students and real estate graduate students. International Journal of Construction Education and Research, 4(1), pp. 46-64. ISSN 1557-8771
Oliveira, Nylvandir Liberato Fernandes de (2018) Risk analysis in civil construction projects in Brazil: A measurement method. PhD thesis, Universidade Federal Fluminense, Brazil.
Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364
Oliveros-Romero, J and Paton-Cole, V P (2023) Infrastructure development: Reflections on Sierra Leone infrastructure scheme and the lungi bridge project. Journal of Financial Management of Property and Construction, 28(1), pp. 127-144. ISSN 1366-4387
Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.
Oloke, D; Edwards, D J; Wright, B and Love, P E D (2006) A web-based information management system for predicting the breakdown of off-highway plant. Journal of Engineering, Design and Technology, 4(1), pp. 29-45. ISSN 1726-0531
Olomolaiye, P O and Ogunlana, S O (1989) An evaluation of production outputs in key building trades in Nigeria. Construction Management and Economics, 7(1), pp. 75-86. ISSN 01446193
Oloufa, A A; Eltahan, A A and Papacostas, C S (1994) Integrated GIS for construction site investigation. Journal of Construction Engineering and Management, 120(1), pp. 211-222. ISSN 0733-9364
Olugboyega, O; Edwards, D J; Windapo, A O; Omopariola, E D and Martek, I (2021) Development of a conceptual model for evaluating the success of BIM-based construction projects. Smart and Sustainable Built Environment, 10(4), pp. 681-701. ISSN 2046-6099
Oluwole, A O; Jane Jia Suen, L; Heap-Yih, C and Akanmu, A A (2021) Building information modelling penetration in quantity surveying practice. Built Environment Project and Asset Management, 11(5), pp. 888-902. ISSN 2044-124X
Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities. PhD thesis, University of the West of England, Bristol, UK.
Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.
Omar Attallah, S; Senouci, A; Kandil, A and al-Derham, H (2013) Utilization of life-cycle analysis to evaluate sustainability rating systems for construction projects with a case study on qatar sustainability assessment system (qsas). Smart and Sustainable Built Environment, 2(3), pp. 272-287. ISSN 2046-6099
Omaran, S M (2021) Improving leadership and decision-making skills of construction project managers through the development and use of simulation model and framework. PhD thesis, Western Michigan University, USA.
Omopariola, E D; Olanrewaju, O I; Albert, I; Oke, A E and Ibiyemi, S B (2024) Sustainable construction in the Nigerian construction industry: Unsustainable practices, barriers and strategies. Journal of Engineering, Design and Technology, 22(4), pp. 1158-1184. ISSN 1726-0531
Omopariola, E D and Windapo, A (2019) Financial management strategies that influence project and organisation performance. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Omotayo, T; Olanipekun, A; Obi, L and Boateng, P (2020) A systems thinking approach for incremental reduction of non-physical waste. Built Environment Project and Asset Management, 10(4), pp. 509-528. ISSN 2044-124X
Omotayo, T S (2017) Strategic realignment of the post-contract cost control process in the Nigerian construction industry using kaizen. PhD thesis, University of Salford, UK.
Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.
Ong, H C (2003) A new model of public private partnerships for affordable housing in Malaysia. PhD thesis, University of Salford, UK.
Ongkowijoyo, C and Doloi, H (2017) Determining critical infrastructure risks using social network analysis. International Journal of Disaster Resilience in the Built Environment, 8(1), pp. 5-26. ISSN 1759-5916
Onsarigo, L; Duncan, K and Atalah, A (2020) The effect of prevailing wages on building costs, bid competition, and bidder behaviour: Evidence from Ohio school construction. Construction Management and Economics, 38(10), pp. 917-933. ISSN 01446193
Onsarigo, L M (2016) Cost comparison of horizontal auger boring and open-cut construction methods for culvert installations. PhD thesis, Indiana State University, USA.
Oo, B L (2007) Modelling individual contractors' bidding decisions in different competitive environments. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Oo, B L (2017) Release of construction clients' pre-tender cost estimates: An experimental study. Construction Economics and Building, 17(4), pp. 37-47. ISSN 2204-9029
Oo, B L; Drew, D S and Lo, H P (2007) Applying a random coefficients logistic model to contractors' decision to bid. Construction Management and Economics, 25(4), pp. 387-398. ISSN 1466433X
Oo, B L; Drew, D S and Lo, H P (2010) Modeling the heterogeneity in contractors' mark-up behavior. Journal of Construction Engineering and Management, 136(7), pp. 720-729. ISSN 0733-9364
Oo, B L; Ling, F Y Y and Soo, A (2015) Construction procurement: Modelling bidders' learning in recurrent bidding. Construction Economics and Building, 15(4), pp. 16-29. ISSN 2204-9029
Opawole, A; Alao, O O; Yusuf, A O; Adu, E T and Ofoetan, M A (2022) Evaluation of compliance of concreting materials to standards in building projects in Lagos state, Nigeria. Journal of Construction Business and Management, 5(2), pp. 1-19. ISSN 2521-0165
Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Orabi, W and El-Rayes, K (2012) Optimizing the rehabilitation efforts of aging transportation networks. Journal of Construction Engineering and Management, 138(4), pp. 529-539. ISSN 0733-9364
Ordonez Arizaga, J F (2007) A methodology for project risk analysis using Bayesian belief networks within a Monte Carlo simulation environment. PhD thesis, University of Maryland, College Park, USA.
Orooji, F (2015) Risk-based wind loss and mitigation for residential wood framed construction. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Orstavik, F (2018) Negotiating and knowing built quality. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Osama, M; Sherif, A and Badawy, M (2023) Risk analysis of construction of administration projects using Bayesian networks. Journal of Engineering, Design and Technology, 21(1), pp. 281-298. ISSN 1726-0531
Osei-Appiah, V K; Kissi, E; Karikari, V A; Ayeng, P; Danquah-Smith, E and Adesi, M (2024) Assessing the impact of early supplier involvement on public works procurement. Journal of Financial Management of Property and Construction, 29(2), pp. 229-249. ISSN 1366-4387
Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387
Oshodi, O S; Thwala, W D; Odubiyi, T B; Abidoye, R B and Aigbavboa, C O (2019) Using neural network model to estimate the rental price of residential properties. Journal of Financial Management of Property and Construction, 24(2), pp. 217-230. ISSN 1366-4387
Osman, I A (2022) Impacts of global pandemics on construction projects and dispute resolution provisions. PhD thesis, University of Illinois at Chicago, USA.
Ostrovsky, Y (2003) Four studies of lifecycle patterns of housing arrangements in Canada. PhD thesis, York University, Canada.
Otegbulu, A C (2011) A contingent valuation model for assessing electricity demand. Journal of Financial Management of Property and Construction, 16(2), pp. 126-146. ISSN 1366-4387
Otegbulu, A C; Osagie, J U and Famuyiwa, F (2009) A value hierarchy study of building services/components in commercial and residential developments: A comparative analysis. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Oteifa, S and Baldwin, A (1991) Estimators' tasks and computer-aided estimating systems: A survey of fcec member companies. Construction Management and Economics, 9(6), pp. 543-552. ISSN 01446193
Oteifa, S A (1991) An investigation into civil engineering estimators' decision making and expertise. PhD thesis, Loughborough University, UK.
Oteng-Abayie, E F and Dramani, J B (2019) Time-frequency domain causality of prime building cost and macroeconomic indicators in Ghana: Implications for project selection. Construction Management and Economics, 37(5), pp. 243-256. ISSN 01446193
Othman, A A E and Alamoudy, F O (2021) Optimising building performance through integrating risk management and building information modelling during the design process. Journal of Engineering, Design and Technology, 19(6), pp. 1233-1267. ISSN 1726-0531
Othman, A A E and El-Saeidy, Y A (2024) Early supplier involvement framework for reducing construction waste during the design process. Journal of Engineering, Design and Technology, 22(2), pp. 578-597. ISSN 1726-0531
Othman, A A E and Kamal, A R (2024) A framework for enhancing building maintainability through facilitating early suppliers' involvement in the design process. Journal of Engineering, Design and Technology, 22(4), pp. 1231-1256. ISSN 1726-0531
Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599
Ottaviani, F M; De Marco, M; Audisio, A; Wong, J and Belack, C (2024) A brief review of artificial intelligence techniques for conceptual cost estimation in construction projects. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.
Ovararin, N (2001) Quantifying productivity loss due to field disruptions in masonry construction. PhD thesis, University of Texas at Austin, USA.
Owusu-Manu, D G; Amo-Asamoah, E; Ghansah, F A and Asumadu, G (2022) An analysis of the economic viability of waste-to-energy generation in the kumasi metropolis of Ghana. Journal of Financial Management of Property and Construction, 27(1), pp. 1-15. ISSN 1366-4387
Owusu-Manu, D G; Edwards, D J; Donkor-Hyiaman, K A; Asiedu, R O; Hosseini, M R and Obiri-Yeboah, E (2019) Housing attributes and relative house prices in Ghana. International Journal of Building Pathology and Adaptation, 37(5), pp. 733-746. ISSN 23984708
Owusu-Manu, D G; Edwards, D J; Mohammed, A; Thwala, W D and Birch, T (2019) Short run causal relationship between foreign direct investment (FDI) and infrastructure development. Journal of Engineering, Design and Technology, 17(6), pp. 1202-1221. ISSN 1726-0531
Owusu-Manu, D G; Ghansah, F A; Darko, A; Asiedu, R O and Edwards, D J (2020) Insurable and non-insurable risks in complex project deals: Case of the Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(6), pp. 1971-1995. ISSN 1726-0531
Owusu-Manu, D G; Kukah, A S; Edwards, D J; Pärn, E A; El-Gohary, H and Aigbavboa, C (2018) Causal relationships of moral hazard and adverse selection of Ghanaian public-private-partnership (PPP) construction projects. Journal of Engineering, Design and Technology, 16(3), pp. 439-460. ISSN 1726-0531
Owusu-Manu, D-G; John, E D; Adesi, M; Badu, E and Love, P E D (2016) Attaining fairness in construction cost consultancy pricing services: A case study in Ghana. Journal of Engineering, Design and Technology, 14(4), pp. 699-712.
Oyediran, A; Oke, A E; Ikuabe, M; Aliu, J; Adeosun, F E and Aigbavboa, C O (2025) Exploring application areas of cyber-physical systems in the construction industry: A case of Nigeria. International Journal of Construction Management, 25(15), pp. 1811-1823. ISSN 1562-3599
Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.
Oyegoke, A S; McDermott, P; Aouad, G and Cleary, M (2009) Skill competency development strategies by a contractor. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(3), pp. 121-130. ISSN 17514312
Oyegoke, A S; Powell, R; Ajayi, S; Godawatte, G A G R and Akenroye, T (2022) Factors affecting the selection of effective cost control techniques in the UK construction industry. Journal of Financial Management of Property and Construction, 27(2), pp. 141-160. ISSN 1366-4387
Oyenubi, A. and Oyeyipo, O. O. (2026) Cost-carbon trade-offs in green infrastructure: A case of Nigeria. Journal of Engineering, Design and Technology, 24(3), pp. 805-830. ISSN 1726-0531
Oyenubi, A. and Oyeyipo, O. O. (2026) Overcoming GenAI adoption barriers in construction cost management: Evidence from Nigeria. Construction Innovation, pp. 1-26. ISSN 1471-4175
Oyewobi, L; Okanlawon, T T; Ibrahim, K and Jimoh, R A (2025) Influence of blockchain adoption barriers and drivers on potential application areas in the construction lifecycle: Partial least squares structural equation modelling (PLS-SEM) approach. Engineering, Construction and Architectural Management, 32(3), pp. 1798-1815. ISSN 0969-9988
Oyewole, E O and Dada, J O (2019) Training gaps in the adoption of building information modelling by Nigerian construction professionals. Built Environment Project and Asset Management, 9(3), pp. 399-411. ISSN 2044-124X
O’brien, W J; Fischer, M A and Jucker, J V (1995) An economic view of project coordination. Construction Management and Economics, 13(5), pp. 393-400. ISSN 01446193
Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387
Padala, S P S and M Skanda, P (2025) BIM-based multi-objective optimization framework for volumetric analysis of building projects. Journal of Engineering, Design and Technology, 23(5), pp. 1326-1347. ISSN 1726-0531
Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Padala, S P S and Maheswari, J U (2023) Modeling a construction project in a matrix-based framework for managing requirement changes. International Journal of Construction Management, 23(14), pp. 2369-2390. ISSN 1562-3599
Padala, S P S; Maheswari, J U and Hirani, H (2022) Identification and classification of change causes and effects in construction projects. International Journal of Construction Management, 22(14), pp. 2788-2807. ISSN 1562-3599
Paek, J H; Lee, Y W and Napier, T R (1992) Selection of design/build proposal using fuzzy-logic system. Journal of Construction Engineering and Management, 118(2), pp. 303-317. ISSN 0733-9364
Paek, J H; Lee, Y W and Ock, J H (1993) Pricing construction risk: Fuzzy set application. Journal of Construction Engineering and Management, 119(4), pp. 743-756. ISSN 0733-9364
Pagliara, F; El-Ansari, W and Henke, I (2025) A methodology to estimate the benefits and costs of stakeholder engagement in a transport decision-making process. Smart and Sustainable Built Environment, 14(2), pp. 326-341. ISSN 2046-6099
Paik, S; Kim, J; Kim, Y and Kim, H (2025) Safety analysis and localization of scaffold joints using uav-acquired images. Journal of Construction Engineering and Management, 151(12): 04025194, ISSN 0733-9364
Pakalapati, K; Khalafalla, M and Rueda-Benavides, J (2022) Using moving-window cross-validation algorithm to optimize bid-based cost estimating data usage. International Journal of Construction Management, 22(15), pp. 2855-2863. ISSN 1562-3599
Palaneeswaran, E; Love, P E D; Kumaraswamy, M M and Ng, T S T (2008) Mapping rework causes and effects using artificial neural networks. Building Research & Information, 36(5), pp. 450-465. ISSN 0961-3218
Palaniappan, S; Bashford, H; Li, K; Fafitis, A and Stecker, L (2009) Carbon emissions based on transportation for post-tensioned slab foundation construction: A production home building study in the greater phoenix arizona area. International Journal of Construction Education and Research, 5(4), pp. 236-260. ISSN 1557-8771
Paliari, José Carlos (2008) Method for the prognosis of productivity and the unitary consumption of materials: Hydraulic building systems. PhD thesis, Universidade de São Paulo, Brazil.
Palmer, A C (1992) An investigative study of value engineering in the United States of America and its relationship to United Kingdom cost control procedures. PhD thesis, Loughborough University, UK.
Pan, N F (2006) Evaluation of building performance using fuzzy FTA. Construction Management and Economics, 24(12), pp. 1241-1252. ISSN 1466433X
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Pan, W and Sidwell, R (2011) Demystifying the cost barriers to offsite construction in the UK. Construction Management and Economics, 29(11), pp. 1081-1099. ISSN 1466433X
Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(5), pp. 461-475. ISSN 0969-9988
Panas, A and Pantouvakis, J P (2018) On the use of learning curves for the estimation of construction productivity. International Journal of Construction Management, 18(4), pp. 301-309. ISSN 1562-3599
Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.
Pandey, S; Paudel, S; Devkota, K; Kshetri, K and Asteris, P G (2025) Machine learning unveils the complex nonlinearity of concrete materials' uniaxial compressive strength. International Journal of Construction Management, 25(6), pp. 635-649. ISSN 1562-3599
Paneru, S; Suh, S; Seo, W and Rausch, C (2024) Evaluating the decarbonization potential of industrialized construction: A review of the current state, opportunities, and challenges. Journal of Construction Engineering and Management, 150(9): 03124005, ISSN 0733-9364
Pantelias, A (2009) A methodological framework for probabilistic evaluation of financial viability of transportation infrastructure under public private partnerships. PhD thesis, University of Texas at Austin, USA.
Panthi, K (2009) A methodological framework for modeling pavement maintenance costs for projects with performance-based contracts. PhD thesis, Florida International University, USA.
Panthi, K; Ahmed, S M and Ogunlana, S O (2009) Contingency estimation for construction projects through risk analysis. International Journal of Construction Education and Research, 5(2), pp. 79-94. ISSN 1557-8771
Pantouvakis, J-P (1990) Declarative - configurable estimating systems for the construction industry. PhD thesis, University of Nottingham, UK.
Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364
Panzeter, A A (1993) A methodology for modeling the cost and duration of concrete highway bridges. PhD thesis, Purdue University, USA.
Paquin, J P; Morin, P P; Lambert, A and Koplyay, T (2022) Assessing project contingency reserves with the expected cost overrun risk measure. Journal of Construction Engineering and Management, 148(10): 04022102, ISSN 0733-9364
Pararajasingam, R; Waidyasekara, A S and Victar, H C (2026) Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka. Construction Innovation, 26(1), pp. 22-43. ISSN 1471-4175
Parasonis, J; Keizikas, A and Kalibatiene, D (2012) The relationship between the shape of a building and its energy performance. Architectural Engineering and Design Management, 8(4), pp. 246-256. ISSN 1745-2007
Pareek, P; Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(1), pp. 54-66. ISSN 1562-3599
Parisi, L. and Donyavi, S. (2026) Advancing materials procurement processes in construction: A framework for optimising technology integration in SMEs' construction supply chains. International Journal of Construction Management, 26(7), pp. 1365-1389. ISSN 1562-3599
Park, J. and Moon, S. (2026) Advancing BIM adoption in infrastructure: Addressing standard development, geographic coordinate systems, and common data environment. International Journal of Construction Management, 26(8), pp. 1584-1598. ISSN 1562-3599
Park, A and Chang, C Y (2013) Impacts of construction events on the project equity value of the Channel Tunnel project. Construction Management and Economics, 31(3), pp. 223-237. ISSN 1466433X
Park, H-K (2001) Cash flow forecasting model using moving weights of cost categories for general contractor on jobsite. PhD thesis, University of Wisconsin - Madison, USA.
Park, H-S (2002) Development of a construction productivity metrics system (CPMS). PhD thesis, University of Texas at Austin, USA.
Park, S H (2009) Whole life performance assessment: Critical success factors. Journal of Construction Engineering and Management, 135(11), pp. 1146-1161. ISSN 0733-9364
Park, S-B (2003) Study of multicriteria decision-making: Development of a decision model to determine when to conduct nighttime construction road work. PhD thesis, Oregon State University, USA.
Park, T i (2009) A comprehensive asset management system for sewer infrastructures. PhD thesis, Pennsylvania State University, USA.
Park, Y I and Papadopoulou, T C (2012) Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management, 2(2), pp. 195-216. ISSN 2044-124X
Park, Y J; Gwak, H S and Lee, D E (2017) Dozer workability estimation method for economic dozing. Journal of Construction Engineering and Management, 143(2): 04016096, ISSN 0733-9364
Parker, P E (1992) Efficiency and the response to reform in Chinese urban construction enterprises: A production theory approach. PhD thesis, University of Washington, USA.
Parkinson, T; de Dear, R and Candido, C (2016) Thermal pleasure in built environments: Alliesthesia in different thermoregulatory zones. Building Research & Information, 44(1), pp. 20-33. ISSN 0961-3218
Parthasarathy, M K; Murugasan, R and Murugesan, K (2017) A critical review of factors affecting manpower and equipment productivity in tall building construction projects. Journal of Construction in Developing Countries, 22(S1), pp. 1-18. ISSN 1823-6499
Parvan, K (2012) Estimating the impact of building information modeling (BIM) utilization on building project performance. PhD thesis, University of Maryland, College Park, USA.
Pasha, A H S (1984) The provision of affordable housing in Central Sudan. PhD thesis, University of Bristol, UK.
Pasquire, C; Pennanen, A; Ballard, G and Haahtela, Y (2011) Target costing and designing to targets in construction. Journal of Financial Management of Property and Construction, 16(1), pp. 52-63. ISSN 1366-4387
Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.
Patel, T; Bapat, H and Patel, D (2026) Assessing barriers of automation and robotics adoption in the Indian construction industry: A fuzzy DEMATEL approach. Construction Innovation, 26(3), pp. 935-957. ISSN 1471-4175
Patel, T.; Guo, B. H. W.; van der Walt, J. D. and Bapat, H. (2026) Vision-based automated road construction progress monitoring: Improved u-net segmentation approach. International Journal of Construction Management, 26(10), pp. 2154-2175. ISSN 1562-3599
Patel, A J (1996) Development of fatigue based pay adjustment factors in performance-related specifications for full-depth asphalt concrete pavements. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Patel, D A (2015) Estimating the number of fatal accidents and investigating the determinants of safety performance in indian construction. PhD thesis, Indian Institute of Technology Delhi, India.
Patel, D A and Jha, K N (2016) An estimate of fatal accidents in Indian construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Paterson, Ian (1981) Contractors' risk and insurance in the Australian building industry. PhD thesis, University of New South Wales, Australia.
Patil, S; Goudar, M and Kharadkar, R (2022) Neural network-based estimation of lighting condition in indoor environment with improved brain storm algorithm. Journal of Engineering, Design and Technology, 20(6), pp. 1565-1580. ISSN 1726-0531
Patsiadas, P (2006) Public private partnership in motorway service areas: Decision making, investment analysis and best practice tools. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Patterson, D A; Farnsworth, C B; Hutchings, D M; Eggett, D L and Weidman, J E (2023) Comparing cost, schedule, and quality of CM/GC and DBB project delivery for repetitive commercial construction. International Journal of Construction Education and Research, 19(2), pp. 166-186. ISSN 1557-8771
Patty, R M (1993) A construction engineering platform for the integration of constructability concepts and lessons learned at the point of design. PhD thesis, Purdue University, USA.
Paulson, B C; Beisman, G H; Bell, L C; Bjornsson, H C; Bowerman, M D; Carr, R I; Coppi, D F; Crandall, K C; DeLong, C E; Halpin, D W; Hogg, P; Levin, P; Lluch, J F; Logcher, R D; Melin, J W; Moore, W C; Mueller, F W; Nowak, J A; O'Connor, M J; Pinnell, S S; Sears, G A; Stark, R M; Stevens, J D; Tarkoy, P J and Youngs, J R (1985) Application of small computers in construction. Journal of Construction Engineering and Management, 111(3), pp. 173-189. ISSN 0733-9364
Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364
Paz, Diogo Henrique Fernandes da (2019) Development of a system to support integrated management of construction and demolition waste. PhD thesis, Universidade Federal de Pernambuco, Brazil.
Pearl, R G; Bowen, P A and Nkado, R N (1997) A communication-based examination of construction planning and tendering. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Peckham, G E (1971) The systems approach to school construction: the potential benefits, the necessary conditions, and the implications for Michigan schools. PhD thesis, Michigan State University, USA.
Peer, S (1987) Principles of an integrated construction company mis with emphasis on its quantity-based sub-system. Construction Management and Economics, 5(3), pp. 199-209. ISSN 01446193
Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988
Pekuri, A; Pekuri, L and Haapasalo, H (2015) Business models and project selection in construction companies. Construction Innovation, 15(2), pp. 180-197. ISSN 1471-4175
Peng, M (2006) Item-level quantity-based preliminary cost estimating system for highway structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.
Peng, M (2012) Dam risk analysis and dynamic decision making. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Peng, Min (2006) Item-level quantity-based preliminary cost estimating system for highways structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.
Peng, Z; Deng, W and Hong, Y (2019) Materials consumption, indoor thermal comfort and associated energy flows of urban residential buildings: Case studies from the cold climate zone of China. International Journal of Building Pathology and Adaptation, 37(5), pp. 579-596. ISSN 23984708
Pennington, D E (1977) A cost analysis of the construction management method of school facility construction. EdD thesis, Indiana University, USA.
Penteado Filho, P D A (1984) Productivity trends in the construction industry. PhD thesis, Cornell University, USA.
Pereira, E; Han, S; Abourizk, S and Hermann, U (2017) Empirical testing for use of safety related measures at the organizational level to assess and control the on-site risk level. Journal of Construction Engineering and Management, 143(6): 05017004, ISSN 0733-9364
Perera, A A D A J (1989) Cost effective designs. PhD thesis, Loughborough University, UK.
Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS accesstm and MS projecttm. Construction Management and Economics, 22(2), pp. 203-211. ISSN 01446193
Perera, B A K S; Perera, C S R and Jayalath, C (2022) Contractor’s perspective on key performance indicators of cost control in Asian, middle eastern, and European construction projects. International Journal of Construction Education and Research, 18(3), pp. 217-233. ISSN 1557-8771
Perera, B A K S; Samarakkody, A L and Nandasena, S R (2020) Managing financial and economic risks associated with high-rise apartment building construction in Sri Lanka. Journal of Financial Management of Property and Construction, 25(1), pp. 143-162. ISSN 1366-4387
Perera, B A K S and Shandraseharan, A (2023) A framework for aggregate base course waste control in road construction projects. International Journal of Construction Management, 23(6), pp. 1009-1020. ISSN 1562-3599
Perera, B A K S; Wijewickrama, M K C S; Ranaweera, W R S C and Gamage, I S W (2021) Significant factors influencing the bid mark-up decision of infrastructure projects in Sri Lanka. International Journal of Construction Management, 21(8), pp. 769-783. ISSN 1562-3599
Perera, S; Senaratne, S; Rodrigo, M N N and Brady, L (2021) Analysis of embodied carbon and cost profiles of school buildings in Australia. Built Environment Project and Asset Management, 11(4), pp. 660-672. ISSN 2044-124X
Perez-Bella, J M; Dominguez-Hernandez, J; Cano-Suñen, E; Del Coz-Diaz, J J and Alvarez Rabanal, F P (2015) Improvement alternatives for determining the watertightness performance of building facades. Building Research & Information, 43(6), pp. 723-736. ISSN 0961-3218
Perng, Y H and Chang, C L (2004) How does government procurement law affect bidding price competition in Taiwan? Building Research & Information, 32(6), pp. 497-509. ISSN 0961-3218
Perovic, Miljenka (2015) Overcoming the challenges of building heritage projects: Improvements to time, scope and cost performance. PhD thesis, Queensland University of Technology, Australia.
Perry, J G and Barnes, M (2000) Target cost contracts: An analysis of the interplay between fee, target, share and price. Engineering, Construction and Architectural Management, 7(2), pp. 202-208. ISSN 0969-9988
Persad, K R (1989) Management of the preconstruction process for highway projects using manpower demand prediction models. PhD thesis, University of Texas at Austin, USA.
Persily, A K; Gorfain, J and Brunner, G (2006) Survey of ventilation rates in office buildings. Building Research & Information, 34(5), pp. 459-466. ISSN 0961-3218
Pesantes-Tavares, E R (2011) Construction worker health: A web-based approach to selecting alternatives to hazardous procedures. PhD thesis, University of Florida, USA.
Peter, E; Love, D and Heng, L I (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18(4), pp. 479-490. ISSN 01446193
Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599
Petroutsatou, K; Georgopoulos, E; Lambropoulos, S and Pantouvakis, J P (2012) Early cost estimating of road tunnel construction using neural networks. Journal of Construction Engineering and Management, 138(6), pp. 679-687. ISSN 0733-9364
Peña-Mora, F; Han, S; Lee, S and Park, M (2008) Strategic-operational construction management: Hybrid system dynamics and discrete event approach. Journal of Construction Engineering and Management, 134(9), pp. 701-710. ISSN 0733-9364
Pham, T Q D; Le-Hong, T and Tran, X V (2023) Efficient estimation and optimization of building costs using machine learning. International Journal of Construction Management, 23(5), pp. 909-921. ISSN 1562-3599
Pham, V H S; Nguyen Dang, N T and Nam, N V (2025) Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning. Engineering, Construction and Architectural Management, 32(7), pp. 4852-4886. ISSN 0969-9988
Pham, V H S; Trang, N T N and Dat, C Q (2024) Optimization of production schedules of multi-plants for dispatching ready-mix concrete trucks by integrating grey wolf optimizer and dragonfly algorithm. Engineering, Construction and Architectural Management, 31(11), pp. 4602-4624. ISSN 0969-9988
Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects. PhD thesis, University of Texas at Austin, USA.
Pheng, L S and Hongbin, J (2004) Estimation of international construction performance: Analysis at the country level. Construction Management and Economics, 22(3), pp. 277-289. ISSN 01446193
Pichura, A C (2004) The phenomenon of innovation and its influence on changing project delivery models in construction in Japan. PhD thesis, University of Tokyo, Japan.
Picken, D H and Ilozor, B D (2003) Height and construction costs of buildings in Hong Kong. Construction Management and Economics, 21(2), pp. 107-111. ISSN 01446193
Pieper, P J (1984) The measurement of real investment in structures and the construction productivity decline (deflation). PhD thesis, Northwestern University, USA.
Pieterse, B; Agyekum, K; Manu, P; Mohandes, S R; Cheung, C and Yunusa-Kaltungo, A (2024) Examining critical project management skills for successful delivery of major maintenance projects: Insights from the United Kingdom energy sector. Engineering, Construction and Architectural Management, 31(4), pp. 1556-1584. ISSN 0969-9988
Pieterse, E I (2024) A cost model to improve short-term underinsurance of residential buildings in South Africa. PhD thesis, University of Pretoria, South Africa.
Pilanawithana, Nethmin M (2022) Developing resilience for safety management systems in the building repair and maintenance sector. PhD thesis, Western Sydney University, Australia.
Pin, T H and Scott, W F (1994) Bidding model for refurbishment work. Journal of Construction Engineering and Management, 120(2), pp. 257-273. ISSN 0733-9364
Ping, T; Pan, W and Zhang, Z (2025) Developing a systematic performance measurement framework for benchmarking steel modular building construction. Engineering, Construction and Architectural Management, 32(3), pp. 1837-1856. ISSN 0969-9988
Pinheiro Catalão, F; Cruz, C O and Miranda Sarmento, J (2019) Exogenous determinants of cost deviations and overruns in local infrastructure projects. Construction Management and Economics, 37(12), pp. 697-711. ISSN 01446193
Piroozfar, P A E and Farr, E R P (2015) Visual perception and the choice of systemised building façades. Architectural Engineering and Design Management, 11(1), pp. 65-81. ISSN 1745-2007
Pittenger, D M (2012) Stochastic life cycle cost analysis for sustainable pavement preservation treatments. PhD thesis, University of Oklahoma, USA.
Pittri, H; Agyekum, K; Botchway, E A; Alencastro, J; Oladinrin, O T and Dompey, A M A (2024) Drivers for design for deconstruction (DfD) implementation among design professionals. Smart and Sustainable Built Environment, 13(5), pp. 1134-1154. ISSN 2046-6099
Pleités Lemus, G R (2020) Wage inequality and policy in the United States unionized construction industry from 1907 to 2012. PhD thesis, University of Utah, USA.
Poh, P S H and Chen, J (1998) The Singapore buildable design appraisal system: A preliminary review of the relationship between buildability, site productivity and cost. Construction Management and Economics, 16(6), pp. 681-692. ISSN 01446193
Poh, P S H and Malcolm W. Horner, R (1995) Cost-significant modelling: Its potential for use in south-east Asia. Engineering, Construction and Architectural Management, 2(2), pp. 121-139. ISSN 0969-9988
Polat, G (2010) Using ANP priorities with goal programming in optimally allocating marketing resources. Construction Innovation, 10(3), pp. 346-365. ISSN 1471-4175
Polat, G and Bingol, B N (2013) A comparison of fuzzy logic and multiple regression analysis models in determining contingency in international construction projects. Construction Innovation, 13(4), pp. 445-462. ISSN 1471-4175
Pongpeng, J (2002) Multicriteria and multidecision-makers in tender evaluation. PhD thesis, Queensland University of Technology, Australia.
Ponnaluru, S S (2009) Empirical analysis of used construction equipment and auction house revenues. PhD thesis, Washington State University, USA.
Pontikis, K L (1998) Apartment building process: The design and construction of the korinthos apartment building in Cyprus. PhD thesis, University of California, Berkeley, USA.
Poon, C S; Yu, A T W; Wong, S W and Cheung, E (2004) Management of construction waste in public housing projects in Hong Kong. Construction Management and Economics, 22(7), pp. 675-689. ISSN 01446193
Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.
Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.
Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364
Porter, K A (2000) Assembly-based vulnerability of buildings and its uses in seismic performance evaluation and risk-management decision-making. PhD thesis, Stanford University, USA.
Porwal, A; Parsamehr, M; Szostopal, D; Ruparathna, R and Hewage, K (2023) The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. International Journal of Construction Management, 23(1), pp. 156-166. ISSN 1562-3599
Potts, K F (1988) An alternative payment system for major 'fast track' construction projects. Construction Management and Economics, 6(1), pp. 25-33. ISSN 01446193
Pourghazian, H (2008) Industrial construction methods for cost-effective and sustainable multi-storey buildings. PhD thesis, KTH Royal Institute of Technology, Sweden.
Powell, C (1986) Some trends in relative costs of building types: Description and interpretation. Construction Management and Economics, 4(3), pp. 201-212. ISSN 01446193
Powell, R (2012) Evaluating cognitive screening as a possible solution to reducing accidents and improving workplace productivity through early preventive detection of fatigue-impairment in the construction industry. PhD thesis, University of Bath, UK.
Praticò, F G (2007) Quality and timeliness in highway construction contracts: A new acceptance model based on both mechanical and surface performance of flexible pavements. Construction Management and Economics, 25(3), pp. 305-313. ISSN 1466433X
Praticò, F G (2013) New road surfaces: Logical bases for simple quality-related pay adjustments. Journal of Construction Engineering and Management, 139(11): 4013020, ISSN 0733-9364
Praticò, F G; Casciano, A and Tramontana, D (2011) Pavement life-cycle cost and asphalt binder quality: Theoretical and experimental investigation. Journal of Construction Engineering and Management, 137(2), pp. 99-107. ISSN 0733-9364
Premraj, P (2017) Assessment of project controls for shutdowns/turnarounds/outages. PhD thesis, University of Alabama, USA.
Price, A D F (1986) An evaluation of production output for in situ concrete work. PhD thesis, Loughborough University, UK.
Prozzi, J A (2001) Modeling pavement performance by combining field and experimental data. PhD thesis, University of California, Berkeley, USA.
Psilander, K (2012) Managing production costs of small and large developers in Sweden: A case study on multi-family construction. International Journal of Construction Education and Research, 8(1), pp. 47-62. ISSN 1557-8771
Påsse, D; Disney, O; Roupé, M and Johansson, M (2022) Cost-estimation in construction: Building information modelling versus total BIM. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Pérez-Bella, J M; Domínguez-Hernández, J; Rodríguez-Soria, B; Del Coz-Díaz, J J and Cano-Suñén, E (2013) A new method for determining the water tightness of building facades. Building Research & Information, 41(4), pp. 401-414. ISSN 0961-3218
Qabaja, M and Tenekeci, G (2023) Nexus between construction sector and economic indicators for Turkey and European Union evidenced by panel data analysis. Engineering, Construction and Architectural Management, 30(5), pp. 1978-2007. ISSN 0969-9988
Qian, Q K; Fan, K and Chan, E H W (2016) Regulatory incentives for green buildings: Gross floor area concessions. Building Research & Information, 44(5-6), pp. 675-693. ISSN 0961-3218
Qiao, Y; Fricker, J D and Labi, S (2019) Influence of project bundling on maintenance of traffic costs across highway project types. Journal of Construction Engineering and Management, 145(8): 05019010, ISSN 0733-9364
Qiao, Y; Fricker, J D and Labi, S (2019) Quantifying the similarity between different project types based on their pay item compositions: Application to bundling. Journal of Construction Engineering and Management, 145(9): 04019053, ISSN 0733-9364
Qin, Y and Bulbul, T (2023) An EEG-based mental workload evaluation for ar head-mounted display use in construction assembly tasks. Journal of Construction Engineering and Management, 149(9): 04023088, ISSN 0733-9364
Quah, L K (1988) An evaluation of the risks in estimating and tendering for refurbishment work. PhD thesis, Heriot-Watt University, UK.
Quast, P (1998) Output feedback minimum cost variance control schemes with application to seismic protection of civil engineering structures. PhD thesis, University of Notre Dame, USA.
Rachmawati, F; Mudjahidin, M and Dewi Widowati, E (2024) Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance. International Journal of Construction Management, 24(2), pp. 213-225. ISSN 1562-3599
Radu, A C (2015) Life-cycle estimates of structures subjected to seismic loads. PhD thesis, Cornell University, USA.
Radzi, A R; Azmi, N F; Kamaruzzaman, S N and Rahman, R A (2025) Modeling the critical assessment criteria for construction readiness of BIM-based projects: PLS-SEM approach. Journal of Construction Engineering and Management, 151(6): 04025063, ISSN 0733-9364
Rafiei, M H and Adeli, H (2016) A novel machine learning model for estimation of sale prices of real estate units. Journal of Construction Engineering and Management, 142(2): 04015066, ISSN 0733-9364
Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364
Raftery, J J (1984) An investigation of the suitability of cost models for use in building design. PhD thesis, Liverpool Polytechnic, UK.
Raghib, A T; Belayutham, S; Mohammad, M Z and Ibrahim, C K I C (2023) Causes, effects and potential measures of cost deviations in high-rise building projects in Egypt. International Journal of Construction Management, 23(11), pp. 1875-1885. ISSN 1562-3599
Rahbar, F (1997) Computer-aided parametric planning (CAPP). PhD thesis, Iowa State University, USA.
Rahman, S (2010) Knowledge-based decision support system for multi criteria roofing material selection and cost modelling. PhD thesis, University of Ulster, UK.
Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2008) A conceptual knowledge-based cost model for optimizing the selection of materials and technology for building design. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2009) A knowledge-based decision support system for roofing materials selection and cost estimating: A conceptual framework and data modelling. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988
Rahmouni, S and Smail, R (2020) A design approach towards sustainable buildings in Algeria. Smart and Sustainable Built Environment, 9(3), pp. 229-245. ISSN 2046-6099
Rai, H; Jagannathan, M and Venkata Santosh Kumar, D (2021) Claim tenability assessment in Indian real estate projects using ann and decision tree models. Built Environment Project and Asset Management, 11(3), pp. 468-487. ISSN 2044-124X
Rai, Sanish (2016) Building occupancy simulation and data assimilation using a graph based agent oriented model. PhD thesis, Georgia State University, USA.
Rainer, R K (1968) Predicting productivity of one or two elevators for construction of high-rise buildings. PhD thesis, Oklahoma State University, USA.
Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Raisbeck, P; Duffield, C and Xu, M (2010) Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(4), pp. 345-359. ISSN 1466433X
Raja, P (2025) A building centric urban digital twin for resiliency planning. PhD thesis, Rutgers The State University of New Jersey, USA.
Rajabi Asadabadi, M and Zwikael, O (2024) Unrealistic project goals: Detection and modification. Journal of Construction Engineering and Management, 150(3): 04023166, ISSN 0733-9364
Rajak, S. and Vimal, K. E. K. (2026) Blockchain-based time impact analysis method for sustainable delay management in EPC projects. Journal of Construction Engineering and Management, 152(6): 04026074, ISSN 0733-9364
Rajala, P; Ylä-Kujala, A; Sinkkonen, T and Kärri, T (2022) Profitability in construction: How does building renovation business fare compared to new building business. Construction Management and Economics, 40(3), pp. 223-237. ISSN 01446193
Rajan, A T; Bansal, B and Gemson, J (2014) Private equity investment and real estate development: Evidence from residential projects in India. Journal of Financial Management of Property and Construction, 19(3), pp. 202-225. ISSN 1366-4387
Rajan, T A; Gopinath, G and Behera, M (2014) PPPs and project overruns: Evidence from road projects in India. Journal of Construction Engineering and Management, 140(5): 04013070, ISSN 0733-9364
Rajeh, M (2014) Comparative analysis of construction procurement systems based on transaction costs. PhD thesis, Auckland University of Technology, New Zealand.
Rajeh, M; Tookey, J E; Olabode, J and Rotimi, B (2015) Estimating transaction costs in the New Zealand construction procurement a structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(2), pp. 242-267. ISSN 0969-9988
Raji, B (2018) Sustainable high-rises: Design strategies for energy-efficient and comfortable tall office buildings in various climates. PhD thesis, Delft University of Technology, Netherlands.
Ram, S-A (2024) Understanding sustainability education within undergraduate engineering at the university of Toronto. PhD thesis, University of Toronto, Canada.
Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ramalingam Rethnam, O. and Thomas, A. (2026) A physics-informed deep learning-based urban building thermal comfort modeling and prediction framework for identifying thermally vulnerable building stock. Smart and Sustainable Built Environment, 15(2), pp. 622-648. ISSN 2046-6099
Ramanathan, C; Narayanan, S P and Idrus, A B (2012) Construction delays causing risks on time and cost: a critical review. Construction Economics and Building, 12(1), pp. 37-57. ISSN 2204-9029
Ramanayaka, C and Rotimi, J (2011) Strategy: Towards its applicability for successful project delivery. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ramanayaka, C D D (2013) Developing a strategy-led approach as a suitable methodology for construction project planning and implementation. PhD thesis, Auckland University of Technology, New Zealand.
Rambaldi, A N (1992) A regional market model for construction aggregate materials. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Ramezanpour Jirandeh, R; Ghazi, M; Sotoodeh, A F and Nikian, M (2021) Plate-fin heat exchanger network modeling, design and optimization: A novel and comprehensive algorithm. Journal of Engineering, Design and Technology, 19(5), pp. 1017-1043. ISSN 1726-0531
Ramirez Flores, R A (2015) A stochastic approach for pavement condition projections and budget needs for the MTC pavement management system. PhD thesis, University of Texas at El Paso, USA.
Rampini, Luca (2023) Artificial intelligence enhances digital asset management. PhD thesis, Politecnico di Milano, Italy.
Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.
Ranasinghe, M (1994) Contingency allocation and management for building projects. Construction Management and Economics, 12(3), pp. 233-243. ISSN 01446193
Ranasinghe, M (1996) Total project cost: A simplified model for decision makers. Construction Management and Economics, 14(6), pp. 497-505. ISSN 01446193
Ranasinghe, M (1999) Private sector participation in infrastructure projects: A methodology to analyse viability of BOT. Construction Management and Economics, 17(5), pp. 613-623. ISSN 01446193
Ranasinghe, M (2000) Impact of correlation and induced correlation on the estimation of project cost of buildings. Construction Management and Economics, 18(4), pp. 395-406. ISSN 01446193
Ranawaka, I and Mallawaarachchi, H (2018) A risk-responsive framework for green retrofit projects in Sri Lanka. Built Environment Project and Asset Management, 8(5), pp. 477-490. ISSN 2044-124X
Randolph Thomas, H; Smith, G R and Cummings, D J (1995) Enforcement of liquidated damages. Journal of Construction Engineering and Management, 121(4), pp. 459-463. ISSN 0733-9364
Rankin, J (2023) Reinforcement learning for trench excavation. PhD thesis, Loughborough University, UK.
Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Raouf, A M and Al-Ghamdi, S G (2019) Effectiveness of project delivery systems in executing green buildings. Journal of Construction Engineering and Management, 145(10): 03119005, ISSN 0733-9364
Rapp, R R and Pan, J (2010) Disaster restoration professional body of knowledge. International Journal of Construction Education and Research, 6(3), pp. 202-218. ISSN 1557-8771
Rasdorf, W; Lewis, P; Arocho, I and Hummer, J (2015) Characterizing air pollutant emissions for highway construction projects. Smart and Sustainable Built Environment, 4(3), pp. 315-328. ISSN 2046-6099
Rasdorf, W J and Abudayyeh, O Y (1991) Cost-and schedule-control integration: Issues and needs. Journal of Construction Engineering and Management, 117(3), pp. 486-502. ISSN 0733-9364
Rashad, A; Hegazy, H; Zhang, J; Mahdi, I; Abdel-Rasheed, I and Ebid, A (2025) Developing preliminary cost estimates for foundation systems of high-rise buildings. International Journal of Construction Management, 25(6), pp. 682-698. ISSN 1562-3599
Rasheed, E O and Rotimi, J O B (2024) The green office environment: New Zealand workers' perception of IEQ. Smart and Sustainable Built Environment, 13(5), pp. 1240-1259. ISSN 2046-6099
Rashidi, A; Jazebi, F and Brilakis, I (2011) Neurofuzzy genetic system for selection of construction project managers. Journal of Construction Engineering and Management, 137(1), pp. 17-29. ISSN 0733-9364
Rashidi, M H and Kashani, H (2023) Bayesian modeling of labor earnings in construction. Journal of Construction Engineering and Management, 149(2): 4022168, ISSN 0733-9364
Rasmussen, F. N.; Birkved, M. and Birgisdóttir, H. (2020) Low-carbon design strategies for new residential buildings: Lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007
Rasmussen, F N; Birkved, M and Birgisdóttir, H (2020) Low- carbon design strategies for new residential buildings: lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007
Rasoulimanesh, M.; Rahai, A. and Shahhosseini, V. (2025) An integrated decision support system for strategic budget/resource allocation in bridge infrastructure management based on digital technologies. Smart and Sustainable Built Environment, 15(5), pp. 1939-1966. ISSN 2046-6099
Rastegar, H; Arbab Shirani, B; Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic programming model for bidding price decision in construction projects. Journal of Construction Engineering and Management, 147(4): 02008, ISSN 0733-9364
Rasul, N; Malik, M S A; Bakhtawar, B and Thaheem, M J (2021) Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, 21(11), pp. 1099-1114. ISSN 1562-3599
Rathnayake, A P (2021) A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates. PhD thesis, University of Salford, UK.
Rathnayake, B; Gunathilake, L; Edirisinghe, R and Perera, S (2025) Ecoconstruct: A blockchain-based system for carbon trading in construction projects. Construction Innovation, 25(7), pp. 213-234. ISSN 1471-4175
Ratnasabapathy, S; Alashwal, A and Perera, S (2021) Investigation of waste diversion rates in the construction and demolition sector in Australia. Built Environment Project and Asset Management, 11(3), pp. 427-439. ISSN 2044-124X
Rauf, A; Attoye, D E and Crawford, R H (2024) Evaluating the impact of material service life on embodied energy of residential villas in the United Arab Emirates. Engineering, Construction and Architectural Management, 31(13), pp. 244-270. ISSN 0969-9988
Rautela, P; Joshi, G C and Ghildiyal, S (2019) Economics of seismic safety for earthquake-prone Himalayan province of Uttarakhand in India. International Journal of Disaster Resilience in the Built Environment, 10(5), pp. 317-342. ISSN 1759-5916
Ravirala, V (1995) Multi-criteria optimization methodologies for highway program development. PhD thesis, Rensselaer Polytechnic Institute, USA.
Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364
Razak, D S A; Mills, G and Roberts, A (2016) External failure cost in construction supply chains. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Razavialavi, S and Abourizk, S (2017) Genetic algorithm-simulation framework for decision making in construction site layout planning. Journal of Construction Engineering and Management, 143(1): 04016084, ISSN 0733-9364
Razkenari, M A (2019) Framework for measuring industrialized construction maturity. PhD thesis, University of Florida, USA.
Reaney, M; Griffith, A; Watson, P A and Ellis, C (2001) Construction cost control implications for the planning application process. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Reda, R and Carr, R I (1989) Time-cost trade-off among related activities. Journal of Construction Engineering and Management, 115(3), pp. 475-486. ISSN 0733-9364
Redden, L and Bugg, R A (2022) Efficacy and benefits of a required service-learning course in construction management education. International Journal of Construction Education and Research, 18(4), pp. 315-332. ISSN 1557-8771
Rees, S W; Zhou, Z and Thomas, H R (2006) Multidimensional simulation of earth-contact heat transfer. Building Research & Information, 34(6), pp. 565-572. ISSN 0961-3218
Rehm, M and Ade, R (2013) Construction costs comparison between green and conventional office buildings. Building Research & Information, 41(2), pp. 198-208. ISSN 0961-3218
Reigle, J A (2000) Development of an integrated project-level pavement management model using risk analysis. PhD thesis, West Virginia University, USA.
Reinhardt, J (2003) Navigational models for effective and efficient interaction with integrated product and process models on construction sites. PhD thesis, Carnegie Mellon University, USA.
Reinschmidt, K and Trejo, D (2006) Economic value of building faster. Journal of Construction Engineering and Management, 132(7), pp. 759-766. ISSN 0733-9364
Rekola, M; Kojima, J and Mäkeläinen, T (2010) Towards integrated design and delivery solutions: Pinpointed challenges of process change. Architectural Engineering and Design Management, 6(4), pp. 264-278. ISSN 1745-2007
Rempelos, G (2023) A whole life carbon model for railway track system interventions. PhD thesis, University of Southampton, UK.
Ren, H (1992) Risk management in construction cost and inflation. PhD thesis, University of Reading, UK.
Renuka, S M and Umarani, C (2019) Effect of critical risk factors causing cost deviation in medium sized construction projects. Journal of Construction in Developing Countries, 23(2), pp. 63-85. ISSN 1823-6499
Reynoso Vanderhorst, H D; Heesom, D; Suresh, S; Renukappa, S and Burnham, K (2023) Barriers and cost model of implementing unmanned aerial system (uas) services in a decentralised system: Case of the Dominican Republic. Construction Innovation, 23(4), pp. 833-857. ISSN 1471-4175
Rezaee Arjroody, A; Hosseini, S A; Akhbari, M; Safa, E and Asadpour, J (2024) Accurate estimation of cost and time utilizing risk analysis and simulation (case study: Road construction projects in Iran). International Journal of Construction Management, 24(1), pp. 19-30. ISSN 1562-3599
Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.
Rezazadeh Azar, E; Dickinson, S and McCabe, B (2013) Server-customer interaction tracker: Computer vision-based system to estimate dirt-loading cycles. Journal of Construction Engineering and Management, 139(7), pp. 785-794. ISSN 0733-9364
Ribas, D A and Cachim, P (2019) Economic sustainability of buildings: Assessment of economic performance and sustainability index. Engineering, Construction and Architectural Management, 26(1), pp. 2-28. ISSN 0969-9988
Rich, F A (2020) Managing the wear of heavy construction equipment steel track undercarriage by soil sand content. PhD thesis, Indiana State University, USA.
Richardson, S (2017) Embodied carbon assessment and decision making under uncertainty: case studies of UK supermarket construction. EngD thesis, University of Reading, UK.
Righetto, E.; Micelli, E. and Pellegrino, M. (2026) Can the deep retrofit of the housing stock cost less? Learning curves and the costs of off-site industrialised construction in France. Construction Management and Economics, 44(5), pp. 359-380. ISSN 0144-6193
Rijal, H B; Humphreys, M A and Nicol, J F (2009) Understanding occupant behaviour: The use of controls in mixed-mode office buildings. Building Research & Information, 37(4), pp. 381-396. ISSN 0961-3218
Rijal, H B; Humphreys, M A and Nicol, J F (2017) Towards an adaptive model for thermal comfort in Japanese offices. Building Research & Information, 45(7), pp. 717-729. ISSN 0961-3218
Rilett, L R (1998) Identifying component variability of end product specification tests. Journal of Construction Engineering and Management, 124(2), pp. 133-138. ISSN 0733-9364
Riley, D R; Diller, B E and Kerr, D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), pp. 953-962. ISSN 0733-9364
Ringwald, R C (1986) General overhead distribution to project costs. Journal of Construction Engineering and Management, 112(1), pp. 83-89. ISSN 0733-9364
Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.
Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364
Roachanakanan, K (2005) A case study of cost overruns in a Thai condominium project. PhD thesis, Texas A&M University, USA.
Robert, O K; Dansoh, A and Ofori-Kuragu, J K (2014) Reasons for adopting public-private partnership (PPP) for construction projects in Ghana. International Journal of Construction Management, 14(4), pp. 227-238. ISSN 1562-3599
Robert Thomas, R (2020) Examining the relationship of bid difference and disadvantaged business enterprise participation goals in highway construction projects. PhD thesis, Purdue University, USA.
Roberts, B M; Allinson, D and Lomas, K J (2023) Evaluating methods for estimating whole house air infiltration rates in summer: Implications for overheating and indoor air quality. International Journal of Building Pathology and Adaptation, 41(1), pp. 45-72. ISSN 23984708
Roberts, J (1987) The business roundtable construction industry cost effectiveness task force. Construction Management and Economics, 5(2), pp. 95-100. ISSN 01446193
Robinson, Benjamin Tyrell (2021) Identifying and pricing risk in residential development. PhD thesis, RMIT University, Australia.
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193
Rodionova, A (2022) Robust and reliable building renovation strategies for environmental and economic performance. DSc thesis, ETH Zürich, Switzerland.
Rodrigo, M N N; Perera, S; Senaratne, S and Jin, X (2022) Systematic development of a data model for the blockchain-based embodied carbon (bec) estimator for construction. Engineering, Construction and Architectural Management, 29(9), pp. 3311-3330. ISSN 0969-9988
Rodrigo, N; Perera, S; Senaratne, S and Jin, X (2024) Development of a blockchain-based embodied carbon estimator. Built Environment Project and Asset Management, 14(6), pp. 914-936. ISSN 2044-124X
Rodrigues, C A (2017) Life-cycle environmental and cost assessment of building retrofits: Evaluating conventional and streamlined approaches. PhD thesis, Universidade de Coimbra, Portugal.
Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175
Roghabadi, M A and Moselhi, O (2022) Forecasting project duration using risk-based earned duration management. International Journal of Construction Management, 22(16), pp. 3077-3087. ISSN 1562-3599
Roghanian, E; Alipour, M and Rezaei, M (2018) An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management, 18(1), pp. 1-13. ISSN 1562-3599
Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan. PhD thesis, University of Michigan, USA.
Rojas, E M (2008) Single versus multiple prime contracting. Journal of Construction Engineering and Management, 134(10), pp. 758-765. ISSN 0733-9364
Rojas, E M and Kell, I (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387-397. ISSN 0733-9364
Romeiras de Lemos, M T (2002) Sustainable competitive advantage in PFI: A systematic and holistic approach to identify the csfs in risk management in PFI, taking into account the whole life cycle. PhD thesis, University of Salford, UK.
Rooke, J; Seymour, D and Fellows, R (2004) Planning for claims: An ethnography of industry culture. Construction Management and Economics, 22(6), pp. 655-662. ISSN 01446193
Rosenfeld, Y (2014) Root-cause analysis of construction-cost overruns. Journal of Construction Engineering and Management, 140(1): 04013039, ISSN 0733-9364
Rosenfeld, Y; Warszawski, A and Laufer, A (1992) Using quality circles to raise productivity and quality of work life. Journal of Construction Engineering and Management, 118(1), pp. 17-33. ISSN 0733-9364
Ross, A and Goulding, J (2007) Supply chain transactional barriers to design cost management. Construction Innovation, 7(3), pp. 274-287. ISSN 1471-4175
Ross, A D and Goulding, J S (2006) The construction estimator's approach to the collection and assessment of supply chain price information. Journal of Construction Procurement, 12(1),
Rossenbach, T D (2018) The development of a management accounting system for decentralised construction companies. PhD thesis, University of Gloucestershire, UK.
Rouhana, F and Jawad, D (2020) Transportation network resilience against failures: GIS-based assessment of network topology role. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 357-370. ISSN 1759-5916
Rowings, J E and Walker, R O (1984) Construction energy use. Journal of Construction Engineering and Management, 110(4), pp. 447-458. ISSN 0733-9364
Rudeli, N; Santilli, A; Puente, I and Viles, E (2017) Statistical model for schedule prediction: Validation in a housing-cooperative construction database. Journal of Construction Engineering and Management, 143(11): 04017083, ISSN 0733-9364
Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193
Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques. PhD thesis, Iowa State University, USA.
Ruegg, R T and Fuller, S K (1985) The economics of fire protection: Fast-response residential sprinklers. Construction Management and Economics, 3(1), pp. 43-57. ISSN 01446193
Ruff, C M; Dzombak, D A and Hendrickson, C T (1996) Owner-contractor relationships on contaminated site remediation projects. Journal of Construction Engineering and Management, 122(4), pp. 348-353. ISSN 0733-9364
Rumawas, W (2022) Employees’ turnover intention in the construction industry in Indonesia. Journal of Construction in Developing Countries, 27(2), pp. 127-146. ISSN 1823-6499
Runeson, G (1988) An analysis of the accuracy of estimating and the distribution of tenders. Construction Management and Economics, 6(4), pp. 357-370. ISSN 01446193
Runeson, G r (1996) Models of construction price determination: A comparative appraisal. PhD thesis, Queensland University of Technology, Australia.
Rungjang, K (2013) Public investment for developing port facilities within competitive market. PhD thesis, University of Wisconsin - Madison, USA.
Rupp, S H and Plagmann, M (2019) Characterisation of air permeability of common ceiling linings and penetrations. International Journal of Building Pathology and Adaptation, 37(4), pp. 448-460. ISSN 23984708
Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175
Ruwanpura, U D R E; Perera, B A K S and Ranadewa, T (2025) Lean tools used in administrative processes across sectors: a systematic review and insights for the construction industry. Construction Innovation, 25(4), pp. 1287-1314. ISSN 1471-4175
S. Shehata, A.; M. El-Kelesh, A. and El-Kasaby, E. S. (2026) Effects of ground conditions on utilization factor of slurry tbms in soft ground tunneling. Engineering, Construction and Architectural Management, 33(7), pp. 5275-5299. ISSN 0969-9988
Sabellano, R E (2023) Development of a decision-making tool for bridge preservation and maintenance. DEng thesis, Morgan State University, USA.
Sachs, T; Tiong, R and Wagner, D (2007) Political risk quantification using fuzzy set approach. Journal of Financial Management of Property and Construction, 12(2), pp. 107-126. ISSN 1366-4387
Sackey, S and Kim, B S (2018) Environmental and economic performance of asphalt shingle and clay tile roofing sheets using life cycle assessment approach and TOPSIS. Journal of Construction Engineering and Management, 144(11): 04018104, ISSN 0733-9364
Sacks, A; Nisbet, A; Ross, J and Harinarain, N (2012) Life cycle cost analysis: A case study of Lincoln on the Lake. Journal of Engineering, Design and Technology, 10(2), pp. 228-254. ISSN 1726-0531
Sacks, R; Eastman, C M and Lee, G (2004) Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry. Journal of Construction Engineering and Management, 130(2), pp. 206-215. ISSN 0733-9364
Sacks, R; Rozenfeld, O and Rosenfeld, Y (2009) Spatial and temporal exposure to safety hazards in construction. Journal of Construction Engineering and Management, 135(8), pp. 726-736. ISSN 0733-9364
Sadat, H and Thomas, N (2025) An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects. International Journal of Construction Management, 25(6), pp. 624-634. ISSN 1562-3599
Sadeghi, S.; Niu, C.; Marjani, T. and Lotfi, R. (2026) Machine learning-enabled construction project management: Systematic review, comparative performance synthesis and implementation framework. Built Environment Project and Asset Management, 16(3), pp. 461-483. ISSN 2044-124X
Sadeghi, N; Dehghani, M S and Ingolfsson, A (2024) Choice of probability distributions for activity durations in project networks with limited sample size. Journal of Construction Engineering and Management, 150(3): 04024002, ISSN 0733-9364
Sadeghi, N; Fayek, A R and Seresht, N G (2016) A fuzzy discrete event simulation framework for construction applications: Improving the simulation time advancement. Journal of Construction Engineering and Management, 142(12): 04016071, ISSN 0733-9364
Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.
Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.
Sadeh, H; Zhang, R; Gaedicke, C; Shahbodaghlou, F; Lee, M J and Todorov, D (2026) Embracing generative AI in construction through a quantitative analysis and weighted score ranking of perceptions, applications, and complexities. Journal of Construction Engineering and Management, 152(5): 04026041, ISSN 0733-9364
Sadeh, H; Mirarchi, C and Pavan, A (2021) Integrated approach to construction risk management: Cost implications. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364
Sadeh, H; Mirarchi, C; Shahbodaghlou, F and Pavan, A (2023) Predicting the trends and cost impact of COVID-19 OSHA citations on US construction contractors using machine learning and simulation. Engineering, Construction and Architectural Management, 30(8), pp. 3461-3479. ISSN 0969-9988
Sadick, A M; Gurmu, A and Gunarathna, C (2025) Artificial intelligence-based pre-conception stage construction budget decision-making model and tool for residential buildings. Engineering, Construction and Architectural Management, 32(7), pp. 4552-4580. ISSN 0969-9988
Sadrinooshabadi, S; Taheri, A; Yitmen, I and Jongeling, R (2021) Requirement management in a life cycle perspective based on ISO 19650-1 and coclass as the new classification system in Sweden. Engineering, Construction and Architectural Management, 28(9), pp. 2736-2753. ISSN 0969-9988
Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.
Saeidlou, S and Ghadiminia, N (2024) A construction cost estimation framework using DNN and validation unit. Building Research & Information, 52(1-2), pp. 38-48. ISSN 0961-3218
Safapour, E; Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), pp. 157-173. ISSN 2044-124X
Saffar, N (2020) The development of an offsite construction adoption strategic guideline for the Iraqi construction industry. PhD thesis, University of Salford, UK.
Safikhani, S.; Shafaat, A. and Sartipipour, M. (2026) Automated project rescheduling with preemptive activity splitting for baseline restoration. Journal of Construction Engineering and Management, 152(6): 04026065, ISSN 0733-9364
Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988
Said, H and El-Rayes, K (2011) Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6), pp. 421-431. ISSN 0733-9364
Said, H M and Reginato, J (2018) Impact of design changes on virtual design and construction performance for electrical contractors. Journal of Construction Engineering and Management, 144(1): 04017097, ISSN 0733-9364
Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Saidu, I; Shakantu, W; Adamu, A and Anugwo, I (2017) A bespoke approach for relating material waste to cost overrun in the construction indsutry. Journal of Construction Business and Management, 1(1), pp. 39-52. ISSN 2521-0165
Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175
Sainati, T (2018) Governance of infrastructure megaprojects : The role of the special purpose entities. PhD thesis, University of Leeds, UK.
Sajid, Z W; Khan, S A; Hussain, F; Ullah, F; Khushnood, R A and Soliman, N (2026) Assessing economic and environmental performance of infill materials through BIM: A life cycle approach. Smart and Sustainable Built Environment, 15(1), pp. 9-39. ISSN 2046-6099
Sajjad, S and Dar, K H (2025) Economic infrastructure and its impact on economic growth: A case study of 7 sister states. Journal of Financial Management of Property and Construction, 30(3), pp. 357-376. ISSN 1366-4387
Saka, N and Lowe, J G (2010) The impact of the petroleum sector on the output of the Nigerian construction sector. Construction Management and Economics, 28(12), pp. 1301-1312. ISSN 1466433X
Saka, N and Olanipekun, A O (2021) Impact of the banking sector reform in the construction sector. Journal of Financial Management of Property and Construction, 26(3), pp. 387-407. ISSN 1366-4387
Saka, N; Saka, A B; Akinradewo, O and Aigbavboa, C O (2024) Impact assessment of political administrations on the performance of the construction sector: A time series analysis. Journal of Engineering, Design and Technology, 22(1), pp. 1-21. ISSN 1726-0531
Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.
Sakka, Z I and El-Sayegh, S M (2007) Float consumption impact on cost and schedule in the construction industry. Journal of Construction Engineering and Management, 133(2), pp. 124-130. ISSN 0733-9364
Salah, A and Moselhi, O (2015) Contingency modelling for construction projects using fuzzy-set theory. Engineering, Construction and Architectural Management, 22(2), pp. 214-241. ISSN 0969-9988
Salam, M A; Sarkar, S; Blackwood, D J and Staines, H J (1999) High-rise building construction in Bangladesh: Experience of questionnaire development and on-site data collection. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Salam, Md Abdus (2007) Time and cost overruns on high-rise building construction in Bangladesh. PhD thesis, Abertay University, UK.
Salama, M A (2011) The relationship between the performance of the economy and the costing of building projects: a case study of school buildings in Egypt. PhD thesis, Heriot-Watt University, UK.
Salama, T; Salah, A and Moselhi, O (2021) Integrating critical chain project management with last planner system for linear scheduling of modular construction. Construction Innovation, 21(4), pp. 525-554. ISSN 1471-4175
Salamah, A A A (1989) COAD: A knowledge-based expert system for conceptual estimates and designs. PhD thesis, University of Colorado at Boulder, USA.
Salas-Morera, L; Arauzo-Azofra, A; García-Hernández, L; Palomo-Romero, J M and Ayuso-Muñoz, J L (2018) New approach to the distribution of project completion time in PERT networks. Journal of Construction Engineering and Management, 144(10): 04018094, ISSN 0733-9364
Salazar, L A; Ballard, G; Arroyo, P and Alarcón, L F (2022) Development of a commitment management system for construction projects. Journal of Construction Engineering and Management, 148(12): 05022012, ISSN 0733-9364
Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.
Saleem, M; Al-Kutti, W A; Al-Akhras, N M and Haider, H (2016) Nondestructive testing procedure to evaluate the load-carrying capacity of concrete anchors. Journal of Construction Engineering and Management, 142(5): 04015104, ISSN 0733-9364
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Saleh, Iraj (1997) The shadow pricing of labour in cost benefit analysis of infrastructure projects: Theory and application to sydney's second airport project. PhD thesis, University of Western Sydney, Australia.
Salehipour, A; Naeni, L M; Khanbabaei, R and Javaheri, A (2016) Lessons learned from applying the individuals control charts to monitoring autocorrelated project performance data. Journal of Construction Engineering and Management, 142(5): 04015105, ISSN 0733-9364
Saleki, S and Bahramani, S K (2019) Designing a low-carbon building via lcb method 3.0, case study: An educational building in Tehran. Journal of Construction in Developing Countries, 23(2), pp. 129-150. ISSN 1823-6499
Salhab, D; Lindhard, S M and Hamzeh, F (2024) Simulation-based approximation of the gain from applying overlapping activities. Journal of Construction Engineering and Management, 150(4): 04024019, ISSN 0733-9364
Salim, M (1993) Process-oriented planning for the placement of reinforcing bars. PhD thesis, North Carolina State University, USA.
Salminen, J (2005) Measuring performance and determining success factors of construction sites. PhD thesis, Helsinki University of Technology, Finland.
Salter, M (1989) Planning systems for small firms. PhD thesis, Sheffield Hallam University, UK.
Salvado, F; de Almeida, N M and Azevedo, Á V E (2019) Historical analysis of the economic life-cycle performance of public school buildings. Building Research & Information, 47(7), pp. 813-832. ISSN 0961-3218
Sam, A (2023) A framework for leadership development in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Samarghandi, H; Tabatabaei, S M M; Taabayan, P; Hashemi, A M and Willoughby, K (2016) Studying the reasons for delay and cost overrun in construction projects: The case of Iran. Journal of Construction in Developing Countries, 21(1), pp. 51-84. ISSN 1823-6499
Samo, S R (1999) Energy conservation in UK housing and the effect of building regulations. PhD thesis, University of Manchester, UK.
Samsami, R (2022) A framework for active construction inspection and visualization using uas. PhD thesis, Michigan Technological University, USA.
Samuel, D (2018) Risk-based tender evaluation using multicriteria decision analysis in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 58-69. ISSN 17514304
Samuels, A F and Bruder, M J (1996) Construction representative: Scheduling and cost management. Journal of Construction Engineering and Management, 122(3), pp. 281-290. ISSN 0733-9364
San Cristóbal, J R (2009) Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), pp. 1271-1274. ISSN 0733-9364
Sandanayake, M; Kumanayake, R and Peiris, A (2022) Environmental impact assessments during construction stage at different geographic levels: a cradle-to-gate analysis of using sustainable concrete materials. Engineering, Construction and Architectural Management, 29(4), pp. 1731-1752. ISSN 0969-9988
Sandanayake, M; Zhang, G and Setunge, S (2022) Impediments affecting a comprehensive emission assessment at the construction stage of a building. International Journal of Construction Management, 22(3), pp. 453-463. ISSN 1562-3599
Sandberg, N H; Bergsdal, H and Brattebø, H (2011) Historical energy analysis of the Norwegian dwelling stock. Building Research & Information, 39(1), pp. 1-15. ISSN 0961-3218
Sanders, S R and Thomas, H R (1993) Masonry productivity forecasting model. Journal of Construction Engineering and Management, 119(1), pp. 163-179. ISSN 0733-9364
Sandhaus, G (1998) Neural networks for cost estimating in project management. PhD thesis, Swansea University, UK.
Sandy, G C (1981) An evaluative comparison of the satisfaction with the utility of new buildings versus library additions and addition/renovations. PhD thesis, Florida State University, USA.
Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.
Sanga, S A and Lucian, C (2016) Cost shares and factor-cost ratios in owner-built incremental housing in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 21(1), pp. 113-130. ISSN 1823-6499
Sanni-Anibire, M O and Adenle, Y A (2024) Residential satisfaction of vertical urban settlements in Hong Kong. Journal of Engineering, Design and Technology, 22(6), pp. 1705-1722. ISSN 1726-0531
Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599
Santos, P A S; Cortez, B and Carvalho, M T M (2025) Integrating GIS and BIM with MCDM for infrastructure planning: A comprehensive framework. Engineering, Construction and Architectural Management, 32(6), pp. 4197-4226. ISSN 0969-9988
Santoso, D S and Bourpanus, N (2019) Moving to e-bidding: Examining the changes in the bidding process and the bid mark-up decisions of Thai contractors. Journal of Financial Management of Property and Construction, 24(1), pp. 2-18. ISSN 1366-4387
Sanyal, A P and Bhattacharya, S P (2024) A comparative analysis between CBR based prediction models and mra models for high-rise construction delay prediction. International Journal of Construction Management, 24(2), pp. 124-136. ISSN 1562-3599
Sapian, A R (2009) Validation of the computational fluid dynamics method for predicting wind flow around a high-rise building in an urban boundary layer condition. Journal of Construction in Developing Countries, 14(2), pp. 1-20. ISSN 1823-6499
Sarah Slaughter, E (1999) Assessment of construction processes and innovations through simulation. Construction Management and Economics, 17(3), pp. 341-350. ISSN 01446193
Saranya P; Nagarajan, P and Shashikala, A P (2024) Fracture properties of ggbs-dolomite geopolymer concrete. Journal of Engineering, Design and Technology, 22(1), pp. 120-129. ISSN 1726-0531
Sardén, Y and Stehn, L (2005) Managing transformation, flow and value generation: A solid timber frame housing case. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Sarhan, J G; Xia, B; Fawzia, S and Karim, A (2017) Lean construction implementation in the Saudi Arabian construction industry. Construction Economics and Building, 17(1), pp. 46-69. ISSN 2204-9029
Sarihi, M; Shahhosseini, V and Banki, M T (2023) Development and comparative analysis of the fuzzy inference system-based construction labor productivity models. International Journal of Construction Management, 23(3), pp. 423-433. ISSN 1562-3599
Sarkar, D (2018) Hybrid approach for resource optimization and management of bridge projects using bootstrap technique and genetic algorithm. International Journal of Construction Management, 18(3), pp. 207-220. ISSN 1562-3599
Sasidharan, M P (2020) A risk-informed approach to setting economically-justifiable maintenance strategies for railway tracks. PhD thesis, University of Birmingham, UK.
Sassano, G (2022) Optimism bias and cost overruns: experimenting on the internal and external views in resources and time estimation. PhD thesis, University College London, UK.
Satirasetthavee, D and Herabat, P (2007) Integration of the component of financial statement in highway maintenance planning. Construction Management and Economics, 25(9), pp. 925-936. ISSN 1466433X
Savaş, S; Acar, E and Acar, D (2024) A project management model for architectural restoration projects. International Journal of Construction Management, 24(15), pp. 1698-1707. ISSN 1562-3599
Savikko, H; Hokkanen, J; Metsäranta, H; Honkatukia, J; Haapanen, M; Tohmo, T and Pongrácz, E (2025) A methodological framework to assess the employment impacts of transport infrastructure construction. Construction Economics and Building, 25(2), pp. 143-167. ISSN 2204-9029
Savoie, É; Sapinski, J P and Laroche, A M (2025) Key factors for revitalising heritage buildings through adaptive reuse. Buildings & Cities, 6(1), pp. 103-120. ISSN 2632-6655
Sawan, R; Low, J F and Schiffauerova, A (2018) Quality cost of material procurement in construction projects. Engineering, Construction and Architectural Management, 25(8), pp. 974-988. ISSN 0969-9988
Sayed, A M Z; Assaf, S; Aldosary, A S; Hassanain, M A and Abdallah, A (2020) Drivers of e-bidding implementation in the Saudi Arabian construction industry. Built Environment Project and Asset Management, 10(1), pp. 16-27. ISSN 2044-124X
Sayed, M; Abdel-Hamid, M and El-Dash, K (2023) Improving cost estimation in construction projects. International Journal of Construction Management, 23(1), pp. 135-143. ISSN 1562-3599
Sazalli, S A H; Greenwood, D; Morton, D and Agnew, B (2012) Industrialized building system in Malaysian housing: An emerging innovation system explanation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Schade, J (2013) A design process perspective on the energy performance of buildings. PhD thesis, Luleå University of Technology, Sweden.
Schatteman, D; Herroelen, W; Van De Vonder, S and Boone, A (2008) Methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134(11), pp. 885-893. ISSN 0733-9364
Scheublin, F J M (2001) Project alliance contract in the Netherlands. Building Research & Information, 29(6), pp. 451-455. ISSN 0961-3218
Schexnayder, C; Knutson, K and Fente, J (2005) Describing a beta probability distribution function for construction simulation. Journal of Construction Engineering and Management, 131(2), pp. 221-229. ISSN 0733-9364
Schexnayder, C J; Weber, S L and David, S A (2004) Transportation agency use of owner-controlled insurance programs. Journal of Construction Engineering and Management, 130(4), pp. 517-524. ISSN 0733-9364
Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.
Schiller, G (2007) Urban infrastructure: Challenges for resource efficiency in the building stock. Building Research & Information, 35(4), pp. 399-411. ISSN 0961-3218
Schneider, K (2023) Three essays on investment-based asset pricing. PhD thesis, University of Manchester, UK.
Schoenwitz M, G J and Naim M, P A (2013) How to build what buyers want: Unveiling customer preferences for prefabricated homes. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Schofield, K E (2012) Risk factors for injuries in small and medium sized construction companies. PhD thesis, University of Minnesota, USA.
Schuldt, S and El-Rayes, K (2018) Optimizing the planning of remote construction sites to minimize facility destruction from explosive attacks. Journal of Construction Engineering and Management, 144(5): 04018020, ISSN 0733-9364
Schwatka, N V (2014) Managing through measurement: Occupational health and safety in the construction industry. PhD thesis, Colorado State University, USA.
Schönbeck, P (2022) Data based configuration decisions in hospital construction projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Schönbeck, P; Löfsjögård, M and Ansell, A (2022) Framework for change control in healthcare construction projects compared to current practice. International Journal of Construction Management, 22(12), pp. 2405-2412. ISSN 1562-3599
Scognamiglio, A (2014) Essays in labor economics and political economy. PhD thesis, Massachusetts Institute of Technology, USA.
Scott-Young, C M; Turner, M and Holdsworth, S (2018) Fit for work? Comparative mental health of built environment undergraduates. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(6), pp. 945-961. ISSN 0969-9988
Seddiki, M; Bennadji, A and Tehami, M (2020) Barriers to the adoption of energy efficiency measures in Mostaganem, Algeria. Journal of Construction in Developing Countries, 25(2), pp. 39-61. ISSN 1823-6499
Segol, G (1990) An option pricing model with three stochastic variables and its application to risky projects. PhD thesis, Golden Gate University, USA.
Selinger, S (1983) Payment timing as a factor in bid evaluation. Journal of Construction Engineering and Management, 109(3), pp. 335-341. ISSN 0733-9364
Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988
Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599
Selĺs, M E S; Rubio, J A C and Mullor, J R (2008) Development of a quantification proposal for hidden quality costs: Applied to the construction sector. Journal of Construction Engineering and Management, 134(10), pp. 749-757. ISSN 0733-9364
Semaan, N and Salem, M (2017) A deterministic contractor selection decision-support system for competitive bidding. Engineering, Construction and Architectural Management, 24(1), pp. 61-77. ISSN 0969-9988
Semple, C; Hartman, F T and Jergeas, G (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), pp. 785-795. ISSN 0733-9364
Sena, T C and Fabricio, M M (2023) Framework proposal for BIM implementation in Brazilian construction and development companies. Engineering, Construction and Architectural Management, 30(5), pp. 2101-2123. ISSN 0969-9988
Senanayake, S M A H; Gunawardana, P A M; Perera, B A K S and Rajaratnam, D (2024) Examining the potential use of augmented reality in construction cost management tools and techniques. Journal of Engineering, Design and Technology, 22(6), pp. 1847-1869. ISSN 1726-0531
Senaratne, S (2005) A knowledge-based approach to managing project change in the construction phase within collaborative team settings. PhD thesis, University of Salford, UK.
Senaratne, S and Sexton, M G (2004) Managing construction project change in the knowledge age: A case study. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Senaratne, S and Sexton, M G (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management, 16(2), pp. 186-200. ISSN 0969-9988
Senior, B A (1995) Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 397-403. ISSN 0733-9364
Senouci, A; Alsarraj, A; Gunduz, M and Eldin, N (2017) Analysis of change orders in Qatari construction projects. International Journal of Construction Management, 17(4), pp. 280-292. ISSN 1562-3599
Seo, J; Lee, S and Seo, J (2016) Simulation-based assessment of workers' muscle fatigue and its impact on construction operations. Journal of Construction Engineering and Management, 142(11): 04016063, ISSN 0733-9364
Seo, J W and Choi, H H (2008) Risk-based safety impact assessment methodology for underground construction projects in Korea. Journal of Construction Engineering and Management, 134(1), pp. 72-81. ISSN 0733-9364
Seo, S and Hwang, Y (2001) Estimation of CO2 emissions in life cycle of residential buildings. Journal of Construction Engineering and Management, 127(5), pp. 414-418. ISSN 0733-9364
Seo, W; Kim, B; Bang, S and Kang, Y (2024) Identifying key financial variables predicting the financial performance of construction companies. Journal of Construction Engineering and Management, 150(3): 04024007, ISSN 0733-9364
Seong, J; Kim, H s and Jung, H J (2025) Development of a robust hazardous area tracking algorithm for pan-tilt-zoom (ptz) cameras at construction sites under harsh conditions. Engineering, Construction and Architectural Management, 32(13), pp. 384-405. ISSN 0969-9988
Seppänen, O; Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(6), pp. 608-624. ISSN 01446193
Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.
Serag, E; Oloufa, A; Malone, L and Radwan, E (2010) Model for quantifying the impact of change orders on project cost for U.S. roadwork construction. Journal of Construction Engineering and Management, 136(9), pp. 1015-1027. ISSN 0733-9364
Serpell, A F (2004) Towards a knowledge-based assessment of conceptual cost estimates. Building Research & Information, 32(2), pp. 157-164. ISSN 0961-3218
Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.
Serugga, J (2020) A decision support system for benefits realisation in front end design of construction projects in dynamic contexts. PhD thesis, University of Huddersfield, UK.
Serugga, J; Kagioglou, M; Edwards, D; Talebi, S and Johns, N (2024) Key influences to cost modelling and analysis in off-site construction: Research trends and gap analysis. Architectural Engineering and Design Management, 20(6), pp. 1335-1356. ISSN 1745-2007
Serugga, J; Kagioglou, M and Tzortzopoulos, P (2020) Value generation in front-end design of social housing with QFD and multiattribute utility theory. Journal of Construction Engineering and Management, 146(4): 04020019, ISSN 0733-9364
Settembre Blundo, D; García-Muiña, F E; Pini, M; Volpi, L; Siligardi, C and Ferrari, A M (2019) Sustainability as source of competitive advantages in mature sectors: The case of ceramic district of Sassuolo (Italy). Smart and Sustainable Built Environment, 8(1), pp. 53-79. ISSN 2046-6099
Severn, B W (1980) A simplified methodology for evaluating rural road proposals for less developed countries. PhD thesis, University of New Mexico, USA.
Seyis, S and Ozkan, S (2024) Benefits and challenges of implementing the common data environments in the construction phase of BIM-based projects. Journal of Construction Engineering and Management, 150(8): 04024091, ISSN 0733-9364
Seyman-Guray, T and Kismet, B (2024) Drivers and barriers on implementing XR technologies in the construction industry in Turkey. International Journal of Construction Management, 24(9), pp. 959-974. ISSN 1562-3599
Sha, K; Deng, X; Chen, Q and Xie, B (1997) Evolution of cost estimating system in China: Intelligent estimator for Shandong Province (IES) to general intelligent estimator (GIE). Building Research & Information, 25(1), pp. 11-14. ISSN 0961-3218
Shah, K L (1969) Techniques for estimating construction costs of waste treatment plants. PhD thesis, University of Oklahoma, USA.
Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.
Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X
Shahandashti, S M and Ashuri, B (2013) Forecasting Engineering News-Record construction cost index using multivariate time series models. Journal of Construction Engineering and Management, 139(9), pp. 1237-1243. ISSN 0733-9364
Shahandashti, S M; Razavi, S N; Soibelman, L; Berges, M; Caldas, C H; Brilakis, I; Teizer, J; Vela, P A; Haas, C; Garrett, J; Akinci, B and Zhu, Z (2011) Data-fusion approaches and applications for construction engineering. Journal of Construction Engineering and Management, 137, pp. 863-869. ISSN 0733-9364
Shahedi, F; Etemadfard, H; Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024114, ISSN 0733-9364
Shaheen, A A; Fayek, A R and Abourizk, S M (2007) Fuzzy numbers in cost range estimating. Journal of Construction Engineering and Management, 133(4), pp. 325-334. ISSN 0733-9364
Shaheen, A A-H I (2005) A framework for integrating fuzzy set theory and discrete event simulation in construction engineering. PhD thesis, University of Alberta, Canada.
Shahin, A; Abourizk, S M and Mohamed, Y (2011) Modeling weather-sensitive construction activity using simulation. Journal of Construction Engineering and Management, 137(3), pp. 238-246. ISSN 0733-9364
Shahin, A A (2007) A framework for cold weather construction simulation. PhD thesis, University of Alberta, Canada.
Shahsavand, P; Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(4), pp. 497-533. ISSN 0969-9988
Shahtaheri, M; Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(1), pp. 40-60. ISSN 0969-9988
Shahtaheri, M; Nasir, H and Haas, C T (2015) Setting baseline rates for on-site work categories in the construction industry. Journal of Construction Engineering and Management, 141(5): 04014097, ISSN 0733-9364
Shakantu, W; Muya, M; Tookey, J and Bowen, P (2008) Flow modelling of construction site materials and waste logistics: A case study from Cape Town, South Africa. Engineering, Construction and Architectural Management, 15(5), pp. 423-439. ISSN 0969-9988
Shakantu, W; Tookey, J E and Bowen, P A (2003) The hidden cost of transportation of construction materials: An overview. Journal of Engineering, Design and Technology, 1(1), pp. 103-118. ISSN 1726-0531
Shaked, O and Warszawski, A (1992) Consched: Expert system for scheduling of modular construction projects. Journal of Construction Engineering and Management, 118(3), pp. 488-506. ISSN 0733-9364
Shalaby, A and Ezeldin, A S (2022) A model for work packages optimization in results-based-finance projects. Engineering, Construction and Architectural Management, 29(7), pp. 2810-2835. ISSN 0969-9988
Shalaby, A M H (2021) Model for the automated generation of optimized work packages in results-based-finance mega sanitation projects. PhD thesis, The American University in Cairo, Egypt.
Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.
Shalwani, A and Lines, B C (2021) An empirical analysis of the causes of cost and schedule growth for small healthcare and educational construction projects. International Journal of Construction Education and Research, 17(3), pp. 277-296. ISSN 1557-8771
Shamsai, M; Whitlatch, E and Sezen, H (2007) Economic evaluation of reinforced concrete structures with columns reinforced with prefabricated cage system. Journal of Construction Engineering and Management, 133(11), pp. 864-870. ISSN 0733-9364
Shamshiri, A; Ryu, K R; Park, J Y and Choi, K (2023) Project phase-based contingency adjustment framework for infrastructure renewal projects. Journal of Construction Engineering and Management, 149(2): 04022176, ISSN 0733-9364
Shapira, A and Goldenberg, M (2005) AHP-based equipment selection model for construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1263-1273. ISSN 0733-9364
Shapira, A and Raz, Y (2005) Comparative analysis of shoring towers for high-clearance construction. Journal of Construction Engineering and Management, 131(3), pp. 293-301. ISSN 0733-9364
Sharafi, A; Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of financial conflicts in the operation phase of public-private partnership contracts. Journal of Construction Engineering and Management, 147(6): 78622011, ISSN 0733-9364
Shararah, H H (1981) Evaluation of wall construction techniques based upon economical factors influencing labor and materials. PhD thesis, Oklahoma State University, USA.
Sharma, N; Sood, R and Laishram, B (2025) A hybrid PLS-SEM-ANN approach to COQ optimization. Construction Management and Economics, 43(11), pp. 938-960. ISSN 0144-6193
Sharma, S; Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(4), pp. 299-314. ISSN 1562-3599
Sharma, V; Caldas, C H and Mulva, S P (2020) Identification and prioritization of factors affecting the overall project cost of healthcare facilities. Journal of Construction Engineering and Management, 146(2): 04019106, ISSN 0733-9364
Sharma, V; Zaki, M; Jha, K N and Krishnan, N M A (2022) Machine learning-aided cost prediction and optimization in construction operations. Engineering, Construction and Architectural Management, 29(3), pp. 1241-1257. ISSN 0969-9988
Sharma, V K; Sharma, S K and Singh, A P (2022) Risk enablers modelling for infrastructure projects using Bayesian belief network. International Journal of Construction Management, 22(6), pp. 993-1010. ISSN 1562-3599
Sharrard, A L (2007) Greening construction processes using an input-output-based hybrid life cycle assessment method. PhD thesis, Carnegie Mellon University, USA.
Sharrard, A L; Matthews, H S and Roth, M (2007) Environmental implications of construction site energy use and electricity generation. Journal of Construction Engineering and Management, 133(11), pp. 846-854. ISSN 0733-9364
Shash, A A and Abdul-Hadi, N H (1992) Factors affecting a contractor's mark-up size decision in Saudi Arabia. Construction Management and Economics, 10(5), pp. 415-429. ISSN 01446193
Shash, A A and AbuAlnaja, F M (2023) Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management, 23(7), pp. 1109-1117. ISSN 1562-3599
Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.
Shashwat, S; Zingre, K and Thurairajah, N (2022) Enhancing building energy efficiency estimation by integrating microclimate conditions. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Shaurette, M (2011) Safety and health education for demolition and reconstruction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 129-138. ISSN 17514312
Sheamar, S; Wedawatta, G; Tennakoon, M; Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: An exploratory study from a contractors' perspective. Journal of Financial Management of Property and Construction, 29(2), pp. 211-228. ISSN 1366-4387
Shehab, T; Blampied, N; Nasr, E and Sindhu, L (2024) Ann-based estimation model for the preconstruction cost of pavement rehabilitation projects. International Journal of Construction Management, 24(8), pp. 894-901. ISSN 1562-3599
Shehab, T and Farooq, M (2013) Neural network cost estimating model for utility rehabilitation projects. Engineering, Construction and Architectural Management, 20(2), pp. 118-126. ISSN 0969-9988
Shehadeh, A; Alshboul, O and Hamedat, O (2022) Risk assessment model for optimal gain-pain share ratio in target cost contract for construction projects. Journal of Construction Engineering and Management, 148(2): 04021197, ISSN 0733-9364
Shehadeh, A; Alshboul, O and Tamimi, M (2025) Quantitative analysis of climate-adaptive pavement technologies: Mitigating environmental impact and enhancing economic viability in urban infrastructure. Journal of Construction Engineering and Management, 151(6): 04025064, ISSN 0733-9364
Shen, L Y (1990) Application of risk management to the Chinese construction industry. PhD thesis, University of Reading, UK.
Shen, L Y and Wu, Y Z (2005) Risk concession model for build/operate/transfer contract projects. Journal of Construction Engineering and Management, 131(2), pp. 211-220. ISSN 0733-9364
Shen, X; Lu, M and Chen, W (2011) Tunnel-boring machine positioning during microtunneling operations through integrating automated data collection with real-time computing. Journal of Construction Engineering and Management, 137(1), pp. 72-85. ISSN 0733-9364
Shen, Y; Lin, Z and Wang, Z (2022) Single-side accumulative jacking construction method for large-span arched latticed shells. Journal of Construction Engineering and Management, 148(12): 06022001, ISSN 0733-9364
Sherif, E h and Kaka, A (2004) A multi criteria mode for the selection of the payments systems in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Sherman, R; Parrish, K and Lamanna, A (2021) Identifying and categorizing risks incumbent in us nuclear power plant construction. Journal of Construction Engineering and Management, 147(4): 02018, ISSN 0733-9364
Sherman, Rachael Paige (2020) Assessing the impact of regulation on the performance of power and pipeline projects. PhD thesis, Arizona State University, USA.
Sheth, A and Sarkar, D (2020) Socio-economic feasibility analysis for sustainable mass rapid transit project in Western India. Journal of Construction in Developing Countries, 25(2), pp. 129-151. ISSN 1823-6499
Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.
Shi, Q and Wang, Z (2025) Spatial-temporal evaluation of total-factor energy efficiency in Chinese construction industry based on three-stage super-efficiency sbm-DEA model. Engineering, Construction and Architectural Management, 32(9), pp. 5716-5742. ISSN 0969-9988
Shi, X.; Gong, X.; Ke, Y. and Wu, X. (2026) Bundling strategies for routine expressway maintenance projects with similarity thresholds. Journal of Construction Engineering and Management, 152(8): 04026125, ISSN 0733-9364
Shi, X; Qiao, Y; Zhao, X; Liu, Y; Liu, C; Huang, R and Cui, Y (2025) Improving emergency evacuation capacity for subway stations based on agent-based modelling. Construction Innovation, 25(6), pp. 1865-1881. ISSN 1471-4175
Shi, G; Lu, D; Liu, Z; Du, X; Zhang, Q; Zhao, L and Wang, Z (2024) Material distribution planning method and experimental verification under multinode and multivehicle scene. Journal of Construction Engineering and Management, 150(11): 04024161, ISSN 0733-9364
Shi, J J (1999) A neural network based system for predicting earthmoving production. Construction Management and Economics, 17(4), pp. 463-471. ISSN 01446193
Shi, L; He, Y and Onishi, M (2023) Effect of the internal agency problem on risk-sharing incentive contracts in public-private partnership projects. Journal of Construction Engineering and Management, 149(12): 04023126, ISSN 0733-9364
Shih, R C S; Gayley, A and Doro-on, A M (2005) Risk analysis of terrorism on U.S. Cargo transportation infrastructure. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Shiha, A and El-Adaway, I H (2026) From ports to projects: Estimating the impact of supply chain volatility and trade policy changes on construction material prices. Journal of Construction Engineering and Management, 152(6): 04026064, ISSN 0733-9364
Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364
Shiha, A and El-adaway, I H (2025) Forecasting state-level construction labor earnings for enhanced project cost control: An econometric and deep-learning analysis of the leading economic indicators. Journal of Construction Engineering and Management, 151(12): 04025198, ISSN 0733-9364
Shiha, A and El-adaway, I H (2025) Identifying early warning signs of construction labor shortages. Construction Management and Economics, 43(10), pp. 765-793. ISSN 0144-6193
Shim, E (2008) The decision-making modeling for concurrent planning of construction projects. PhD thesis, Texas A&M University, USA.
Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.
Shipworth, D (2002) A stochastic framework for embodied greenhouse gas emissions modelling of construction materials. Building Research & Information, 30(1), pp. 16-24. ISSN 0961-3218
Shirley, C L M (2000) Firm inventory behavior and the returns from infrastructure investment. PhD thesis, University of California, Berkeley, USA.
Shirong, L (1996) New approach for optimization of overall construction schedule. Journal of Construction Engineering and Management, 122(1), pp. 7-13. ISSN 0733-9364
Shiue, F J; Lee, H Y; Zheng, M C; Khitam, A F K and Assefa, S (2021) An estimation model of construction project segmentation for optimum project pricing. Engineering, Construction and Architectural Management, 28(9), pp. 2361-2380. ISSN 0969-9988
Shoar, S; Nasirzadeh, F and Zarandi, H R (2019) Quantitative assessment of risks on construction projects using fault tree analysis with hybrid uncertainties. Construction Innovation, 19(1), pp. 48-70. ISSN 1471-4175
Shoar, S; Yiu, T W; Payan, S and Parchamijalal, M (2023) Modeling cost overrun in building construction projects using the interpretive structural modeling approach: A developing country perspective. Engineering, Construction and Architectural Management, 30(2), pp. 365-392. ISSN 0969-9988
Shohet, I M and Laufer, A (1996) Exterior cladding methods: A technoeconomic analysis. Journal of Construction Engineering and Management, 122(3), pp. 242-247. ISSN 0733-9364
Shooshtarian, S; Lingard, H and Wong, P S P (2020) Using the cost of construction work to trigger legislative duties for WHS: The Australian experience. Built Environment Project and Asset Management, 10(3), pp. 369-387. ISSN 2044-124X
Shooshtarian, S and Ridley, I (2016) Determination of acceptable thermal range in outdoor built environments by various methods. Smart and Sustainable Built Environment, 5(4), pp. 352-371. ISSN 2046-6099
Short, C A; Barrett, P; Dye, A and Sutrisna, M (2007) Impacts of value engineering on five capital arts projects. Building Research & Information, 35(3), pp. 287-315. ISSN 0961-3218
Short, C A; Song, J; Mottet, L; Chen, S; Wu, J and Ge, J (2018) Challenges in the low-carbon adaptation of China's apartment towers. Building Research & Information, 46(8), pp. 899-930. ISSN 0961-3218
Shourkabi, A (2016) A study of designer time utilisation in Iranian construction consultancies. PhD thesis, Loughborough University, UK.
Showalter, W E and Halpin, D W (2008) Dynamic programming approach to optimization of site remediation. Journal of Construction Engineering and Management, 134(10), pp. 820-827. ISSN 0733-9364
Shr, J F and Chen, W T (2004) Setting maximum incentive for incentive/disincentive contracts for highway projects. Journal of Construction Engineering and Management, 130(1), pp. 84-93. ISSN 0733-9364
Shr, J F; Ran, B and Sung, C W (2004) Method to determine minimum contract bid for A + B+ I/D highway projects. Journal of Construction Engineering and Management, 130(4), pp. 509-516. ISSN 0733-9364
Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction. PhD thesis, University of Wisconsin - Madison, USA.
Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities. PhD thesis, University of Nevada, Las Vegas, USA.
Shrestha, K; Shrestha, P P and Lidder, M (2019) Life-cycle cost comparison of chip seal and striping: In-house workers versus private contractors. Engineering, Construction and Architectural Management, 26(6), pp. 927-944. ISSN 0969-9988
Shrestha, K K (2016) Causes of change orders and its impact on road maintenance contracts. PhD thesis, University of Nevada, Las Vegas, USA.
Shrestha, K P (2016) Data analytics and visualization for enhanced highway construction cost indexes and as-built schedules. PhD thesis, Iowa State University, USA.
Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364
Shrestha, P P and Fernane, J D (2017) Performance of design-build and design-bid-build projects for public universities. Journal of Construction Engineering and Management, 143(3): 04016101, ISSN 0733-9364
Shrestha, P P; Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(6), pp. 1087-1104. ISSN 0969-9988
Shrestha, Rabin (2024) Prediction of cost and schedule changes in transportation projects through historical bid and change order document analysis – using Oklahoma dot project cases. PhD thesis, University of Nevada, Las Vegas, USA.
Shrestha, S; Shan, Y and Goodrum, P M (2024) Identification of best practices in project bundling for state dots using semistructured interviews. Journal of Construction Engineering and Management, 150(7): 04024056, ISSN 0733-9364
Shrivastava, R (2020) Development of risk management model for construction of railway project in India. PhD thesis, University of Petroleum and Energy Studies, India.
Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.
Shuck, D W (1983) Design phase cost estimating. PhD thesis, Purdue University, USA.
Shugran, A A and Ghazali, F E M (2025) Understanding the effects of variation orders on construction project success: insights from the Jordanian context. International Journal of Construction Management, 25(5), pp. 519-529. ISSN 1562-3599
Sidney, E E (2019) Evaluating the adoption of project management tools and techniques in private construction companies in Nigeria. PhD thesis, University of Bedfordshire, UK.
Sidwell, N C (1957) A critical examination of new constructional techniques and their influence on productivity in the building industry, with special reference to housing in south-east Scotland. PhD thesis, University of Edinburgh, UK.
Siew, R Y J; Balatbat, M C A and Carmichael, D G (2013) The relationship between sustainability practices and financial performance of construction companies. Smart and Sustainable Built Environment, 2(1), pp. 6-27. ISSN 2046-6099
Signor, R; Love, P E D; Marchiori, F F and Felisberto, A D (2020) Underpricing in social infrastructure projects: Combating the institutionalization of the winner's curse. Journal of Construction Engineering and Management, 146(12), ISSN 0733-9364
Signor, R; Love, P E D and Olatunji, O (2016) Determining overpricing in Brazilian infrastructure projects: A forensic approach. Journal of Construction Engineering and Management, 142(9): 06016001, ISSN 0733-9364
Sihabuddin, S S and Ariaratnam, S T (2009) Methodology for estimating emissions in underground utility construction operations. Journal of Engineering, Design and Technology, 7(1), pp. 37-64. ISSN 1726-0531
Siham, E Y (2024) Towards a 3D property valuation model: Conceptualization and BIM-CIM based data integrability. PhD thesis, Universite de Liege, Belgium.
Silva, A; Dias, J L; Gaspar, P L and De Brito, J (2011) Service life prediction models for exterior stone cladding. Building Research & Information, 39(6), pp. 637-653. ISSN 0961-3218
Silveira da Costa, V and da Silva Torres, A (2023) Diagnosis of degradation state of the historic building facade through qualitative and quantitative indicators: Case study of the former school of agronomy eliseu maciel. International Journal of Building Pathology and Adaptation, 41(4), pp. 734-766. ISSN 23984708
Silwal, A.; Rouhanizadeh, B.; Safapour, E. and Ricks, M. (2026) Sustainable transportation infrastructure: Comparative analysis and a comprehensive decision-support tool. Built Environment Project and Asset Management, 16(3), pp. 616-636. ISSN 2044-124X
Simon, S and O’brien, W (2023) Pilot study to measure the energy and carbon impacts of teleworking. Buildings & Cities, 4(1), pp. 174-192. ISSN 2632-6655
Simons, A E; Redden, L and Collins, W (2023) Sitework knowledge for entry-level construction professionals: Academic and industry perceptions. International Journal of Construction Education and Research, 19(2), pp. 199-220. ISSN 1557-8771
Simpeh, E K; Ndihokubwayo, R; Love, P E D and Thwala, W D (2015) A rework probability model: A quantitative assessment of rework occurrence in construction projects. International Journal of Construction Management, 15(2), pp. 109-116. ISSN 1562-3599
Sims, B L (1999) Program assessment of the mechanical contractors association of America's Construction Continuing Education Project Management Course. PhD thesis, Purdue University, USA.
Simushi, S and Wium, J (2020) Time and cost overruns on large projects: Understanding the root cause. Journal of Construction in Developing Countries, 25(1), pp. 129-146. ISSN 1823-6499
Sinesilassie, E G; Tabish, S Z S and Jha, K N (2018) Critical factors affecting cost performance: A case of Ethiopian public construction projects. International Journal of Construction Management, 18(2), pp. 108-119. ISSN 1562-3599
Sing, M C P; Edwards, D J; Liu, H J X and Love, P E D (2015) Forecasting private-sector construction works: VAR model using economic indicators. Journal of Construction Engineering and Management, 141(11): 04015037, ISSN 0733-9364
Sing, M C P; Fung, I W H; Edwards, D J and Liu, H (2022) Dynamic construction site layout planning: An application of branch and bond algorithm. International Journal of Building Pathology and Adaptation, 40(4), pp. 523-538. ISSN 23984708
Sing, M C P; Luk, S Y Y; Chan, K H C; Liu, H J and Humphrey, R (2024) Scan-to-BIM technique in building maintenance projects: Practicing quantity take-off. International Journal of Building Pathology and Adaptation, 42(6), pp. 1250-1262. ISSN 2398-4708
Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193
Singh, A (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(5), pp. 312-321. ISSN 0969-9988
Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(6), pp. 507-530.
Singh, A; Thanu, H P and Deepak, M D (2025) Energy-saving strategies to convert existing campus to smart campus: a conservative method analysis. International Journal of Construction Management, 25(6), pp. 718-727. ISSN 1562-3599
Singh, G and Banjoko, O O (1990) The development of a rational bill of quantities. Construction Management and Economics, 8(1), pp. 31-47. ISSN 01446193
Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Singh, P; Oh, J E; Labi, S and Sinha, K C (2007) Cost-effectiveness evaluation of warranty pavement projects. Journal of Construction Engineering and Management, 133(3), pp. 217-224. ISSN 0733-9364
Singh, S (1987) Cost models for approximate cost estimation of structural systems in commercial high rise buildings. PhD thesis, National University of Singapore, Singapore.
Singh, S (1990) Cost model for reinforced concrete beam and slab structures in buildings. Journal of Construction Engineering and Management, 116(1), pp. 54-67. ISSN 0733-9364
Singh, S (1991) Cost estimation of prestressed concrete beam and reinforced concrete slab construction. Construction Management and Economics, 9(2), pp. 205-215. ISSN 01446193
Singh, S; Sharma, S K and Akbar, M A (2023) Heat resistance and sorptivity of an air-entrained concrete containing mineral admixtures and CBA. Journal of Engineering, Design and Technology, 21(2), pp. 527-551. ISSN 1726-0531
Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.
Singla, H K (2020) Does ownership structure and market sentiment affect the performance of IPOs in India in short run? A dynamic panel data analysis. Journal of Financial Management of Property and Construction, 26(1), pp. 1-22. ISSN 1366-4387
Singla, H K and Samanta, P K (2019) Determinants of dividend payout of construction companies: A panel data analysis. Journal of Financial Management of Property and Construction, 24(1), pp. 19-38. ISSN 1366-4387
Singla, H K and Sridharan, S (2022) Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29(10), pp. 4040-4060. ISSN 0969-9988
Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 0969-9988
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Siva Rama Krishna, U and Naga Satish Kumar, C (2022) A case study on maintenance of bituminous concrete pavement considering life cycle cost analysis and carbon footprint estimation. International Journal of Construction Management, 22(9), pp. 1756-1764. ISSN 1562-3599
Skibniewski, M and Hendrickson, C (1988) Analysis of robotic surface finishing work on construction site. Journal of Construction Engineering and Management, 114(1), pp. 53-68. ISSN 0733-9364
Skibniewski, M J and Kassouf, P J (1990) Potential for application of plastic liner plates in tunnelling works. Construction Management and Economics, 8(1), pp. 3-11. ISSN 01446193
Skinner, D (1998) Forecasting models of activity in industrial and commercial building. PhD thesis, University of Salford, UK.
Skinner, D W H (1974) An investigation of the contractor's use of bills of quantities. PhD thesis, Aston University, UK.
Skinner, D W H (1979) An analysis of the utility of bills of quantities in the process of building contracting. PhD thesis, Aston University, UK.
Skitmore, M (1991) The construction contract bidder homogeneity assumption: An empirical test. Construction Management and Economics, 9(5), pp. 403-429. ISSN 01446193
Skitmore, M (1992) Parameter prediction for cash flow forecasting models. Construction Management and Economics, 10(5), pp. 397-413. ISSN 01446193
Skitmore, M (2001) Raftery curves for tender price forecasting: Empirical probabilities and pooling. Journal of Financial Management of Property and Construction, 6(3), pp. 141-154. ISSN 1366-4387
Skitmore, M (2004) Predicting the probability of winning sealed bid auctions: The effects of outliers on bidding models. Construction Management and Economics, 22(1), pp. 101-109. ISSN 01446193
Skitmore, M and Cheung, F K T (2007) Explorations in specifying construction price forecast loss functions. Construction Management and Economics, 25(5), pp. 449-465. ISSN 1466433X
Skitmore, M and Drew, D (2003) The analysis of pre-tender building price forecasting performance: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 36-42. ISSN 0969-9988
Skitmore, M and Lo, H P (2002) A method for identifying high outliers in construction contract auctions. Engineering, Construction and Architectural Management, 9(2), pp. 90-130. ISSN 0969-9988
Skitmore, M and Ng, S T (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460. ISSN 0733-9364
Skitmore, M; Runeson, G and Chang, X (2006) Construction price formation: Full-cost pricing or neoclassical microeconomic theory? Construction Management and Economics, 24(7), pp. 773-783. ISSN 1466433X
Skitmore, R M (2002) Raftery curve construction for tender price forecasts. Construction Management and Economics, 20(1), pp. 83-89. ISSN 01446193
Skitmore, R M; Pettitt, A N and McVinish, R (2007) Gates' bidding model. Journal of Construction Engineering and Management, 133(11), pp. 855-863. ISSN 0733-9364
Skrzypczak, I; Oleniacz, G; Leśniak, A; Zima, K; Mrówczyńska, M and Kazak, J K (2022) Scan-to-BIM method in construction: Assessment of the 3D buildings model accuracy in terms inventory measurements. Building Research & Information, 50(8), pp. 859-880. ISSN 0961-3218
Slater, R and Radford, A (2008) Perceptions in the Australian building industry of deficiencies in architects' design documentation and the effects on project procurement. Construction Economics and Building, 8(1), pp. 23-33. ISSN 2204-9029
Slaughter, E S (2001) Design strategies to increase building flexibility. Building Research & Information, 29(3), pp. 208-217. ISSN 0961-3218
Sloan, B; McLeod, B N; Smith, R M and Goodall, W L (1996) A functional cost approach in the development and use of a project budget cost limit estimator (PBCLE) for capitol building works. Journal of Financial Management of Property and Construction, 1(1), pp. 89-100. ISSN 1366-4387
Smailes, R L (2000) Building chan chan: The application of construction project management to the analysis of ancient architecture. PhD thesis, University of Florida, USA.
Small, E P (1999) Development of a methodology for the integration of seismic risk mitigation activities in project and network level bridge management systems. PhD thesis, State University of New York at Buffalo, USA.
Small, E P; Bakry, I and Ayyash, L (2021) Evaluating the effect of TQM on mep construction productivity and project delivery in Dubai. International Journal of Construction Management, 21(10), pp. 1061-1075. ISSN 1562-3599
Smallwood, J J and Cumberlege, R (2016) Construction management and quantity surveying students perceptions towards production analysis and measuring quantities for construction purposes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.
Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks). PhD thesis, Purdue University, USA.
Smith, G R and Bohn, C M (1999) Small to medium contractor contingency and assumption of risk. Journal of Construction Engineering and Management, 125(2), pp. 101-108. ISSN 0733-9364
Smith, G R and Hancher, D E (1989) Estimating precipitation impacts for scheduling. Journal of Construction Engineering and Management, 115(4), pp. 552-566. ISSN 0733-9364
Smith, I G N (1995) Rainfall patterns and the acceptability of soils for earthworking. PhD thesis, Heriot-Watt University, UK.
Smith, J P; Miller, K; Christofferson, J and Hutchings, M (2011) Best practices for dealing with price volatility in utah's residential construction market. International Journal of Construction Education and Research, 7(3), pp. 210-225. ISSN 1557-8771
Smith, N J (1986) The study of criticality: An investigation based on network theory into the relationship between time and cost in civil engineering bridgeworks contracts and the measurement of the effects of change. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Smith, R E; Griffin, G; Rice, T and Hagehofer-Daniell, B (2018) Mass timber: Evaluating construction performance. Architectural Engineering and Design Management, 14(1-2), pp. 127-138. ISSN 1745-2007
Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Smith, S D (1994) Production estimation of earthmoving operations using a discrete-event simulation model. PhD thesis, University of Edinburgh, UK.
Smith, S D (1999) Earthmoving productivity estimation using linear regression techniques. Journal of Construction Engineering and Management, 125(3), pp. 133-141. ISSN 0733-9364
Smith, S D; Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(2), pp. 219-228. ISSN 01446193
Smyth, H (2016) The business development manager as a value creation worker. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
So, K L (2021) Integrated life-cycle management of highway bridges. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Soe, Y (2017) Construction supply chain risk management framework for construction projects: case studies in Myanmar. PhD thesis, University of Birmingham, UK.
Sohail, M and Cavill, S (2008) Accountability to prevent corruption in construction projects. Journal of Construction Engineering and Management, 134(9), pp. 729-738. ISSN 0733-9364
Sohn, T (2009) Determining durations for right-of-way acquisition and utility adjustment on highway projects. PhD thesis, University of Texas at Austin, USA.
Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(2), pp. 544-570. ISSN 0969-9988
Sohrabi, M (2025) Statistical methods for enhanced coastal flood risk assessment and adaptation planning. PhD thesis, University of Alabama, USA.
Soleimani, N (2022) Earthquake risk to civil infrastructure systems. PhD thesis, University of Delaware, USA.
Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.
Soliman, M (2015) Life-cycle management of civil and marine structures under fatigue and corrosion effects. PhD thesis, Lehigh University, USA.
Somiah, M K (2018) An integrated competitive advantage model for indigenous construction firms in the Ghanaian construction industry. PhD thesis, University of Johannesburg, South Africa.
Sommerville, J; Craig, N and Charles, A (2011) No-fines homes: The make or break question? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model. PhD thesis, Purdue University, USA.
Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364
Son, J and Rojas, E M (2011) Impact of optimism bias regarding organizational dynamics on project planning and control. Journal of Construction Engineering and Management, 137(2), pp. 147-157. ISSN 0733-9364
Son, J and Skibniewski, M J (1999) Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1), pp. 23-31. ISSN 0733-9364
Song, L (2004) Productivity modeling for steel fabrication projects. PhD thesis, University of Alberta, Canada.
Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364
Song, L and Abourizk, S M (2008) Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134(10), pp. 786-794. ISSN 0733-9364
Song, M H and Fischer, M (2020) Generating a daily bill of materials at level of development 400 using the smallest workface boundary. Journal of Construction Engineering and Management, 146(5): 04020035, ISSN 0733-9364
Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes. PhD thesis, Columbia University, USA.
Sonmez, R (2004) Selection of a probability distribution function for construction cost estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Sonmez, R (2008) Parametric range estimating of building costs using regression models and bootstrap. Journal of Construction Engineering and Management, 134(12), pp. 1011-1016. ISSN 0733-9364
Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364
Souchoroukov, P (2004) Improvement of cost estimating internal practice. PhD thesis, Cranfield University, UK.
Sousa, R L (2010) Risk analysis for tunneling projects. PhD thesis, Massachusetts Institute of Technology, USA.
Sousa, Rita dos Santos (2019) Production planning and control methodology for soil bioengineering works. PhD thesis, Universidade Federal de Santa Maria, Brazil.
Sousa, V; Almeida, N M and Dias, L A (2014) Role of statistics and engineering judgment in developing optimized time-cost relationship models. Journal of Construction Engineering and Management, 140(8): 04014034, ISSN 0733-9364
Soutos, M and Lowe, D J (2011) Elemental cost estimating: Current UK practice and procedure. Journal of Financial Management of Property and Construction, 16(2), pp. 147-162. ISSN 1366-4387
Soutos, M K (2006) Forecasting elemental building cost percentages using regression analysis and neural network techniques. PhD thesis, University of Manchester, UK.
Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.
Spielholz, P; Davis, G and Griffith, J (2006) Physical risk factors and controls for musculoskeletal disorders in construction trades. Journal of Construction Engineering and Management, 132(10), pp. 1059-1068. ISSN 0733-9364
Squires, G; Hutchison, N; Adair, A; Berry, J; McGreal, S and Organ, S (2016) Innovative real estate development finance: evidence from Europe. Journal of Financial Management of Property and Construction, 21(1), pp. 54-72. ISSN 1366-4387
Sreram, P K and Thomas, A (2026) A discrete event simulation-based value stream map implementation scheme for small and medium enterprises (SMEs). International Journal of Construction Management, 26(3), pp. 428-444. ISSN 1562-3599
Sridarran, P; Keraminiyage, K and Herszon, L (2017) Improving the cost estimates of complex projects in the project-based industries. Built Environment Project and Asset Management, 7(2), pp. 173-184. ISSN 2044-124X
Srijaroen, C; Hoy, M; Horpibulsuk, S; Rachan, R and Arulrajah, A (2021) Soil-cement screw pile: Alternative pile for low- and medium-rise buildings in soft bangkok clay. Journal of Construction Engineering and Management, 147(2): 1988, ISSN 0733-9364
Srithongrung, A (2006) The impact of state capital budget and management programs on state capital budget decisions and economic performance. DPA thesis, University of Illinois at Springfield, USA.
Srour, I M (2005) A linear programming approach to optimize strategic investment in the construction workforce. PhD thesis, University of Texas at Austin, USA.
Srour, I M; Haas, C T and Morton, D P (2006) Linear programming approach to optimize strategic investment in the construction workforce. Journal of Construction Engineering and Management, 132(11), pp. 1158-1166. ISSN 0733-9364
Ssegawa-Kaggwa, J; Ngowi, A B and Ntshwene, K (2013) Using a situation analysis to identify the construction industry deficiencies in Botswana. Journal of Construction in Developing Countries, 18(1), pp. 1-18. ISSN 1823-6499
Ssimbwa, Edward (2023) Streamlining the management of building construction regulatory framework in Sub-Sahara africa's public service - a case for Uganda. DM thesis, Colorado Technical University, USA.
Staneff, S T (1997) A decision support system for infrastructure management. PhD thesis, University of California, Berkeley, USA.
Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction. PhD thesis, University of Colorado at Boulder, USA.
Stanic, N (2016) Assessment methods for structural and hydraulic properties of concrete sewer pipes. PhD thesis, Delft University of Technology, Netherlands.
Stanley, R and Thurnell, D (2014) The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Construction Economics and Building, 14(1), pp. 105-117. ISSN 2204-9029
Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.
Stemp, B A and Walewski, J (2011) Lampson transi-lift mobile crane: Concept, design, and use. Journal of Construction Engineering and Management, 137, pp. 785-792. ISSN 0733-9364
Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications. PhD thesis, KTH Royal Institute of Technology, Sweden.
Stenis, J (2005) Industrial management models with emphasis on construction waste. PhD thesis, Lund University, Sweden.
Stenlund, K L; Ryd, N and Vennström, A (2009) Client's decisions in strategic briefs and their impact on user values. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Stephen, M and Picken, D (2000) Using risk analysis to determine construction project contingencies. Journal of Construction Engineering and Management, 126(2), pp. 130-136. ISSN 0733-9364
Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.
Sterner, E (2000) Life-cycle costing and its use in the Swedish building sector. Building Research & Information, 28(5-6), pp. 387-393. ISSN 0961-3218
Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.
Stevens, F J (2016) A comparative analysis of the percentage completion project methodology and the stevens earned value instrument. DBA thesis, Wilmington University (Delaware), USA.
Stino, R M (1999) Effect of spatial variables on bricklaying productivity and ergonomics. PhD thesis, University of Michigan, USA.
Stjern, M (1998) Uncertainty in construction contracting: A new approach for contractors. DrIng thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.
Stocks, S N and Singh, A (1999) Studies on the impact of functional analysis concept design on reduction in change orders. Construction Management and Economics, 17(3), pp. 251-267. ISSN 01446193
Stone, M L C (2013) Development of unit cost estimating models with respect to scale economies and material price volatility for use in probabilistic life cycle cost analyses. PhD thesis, University of Alabama, USA.
Stout, Timothy J (2023) Schedule forecast optimization for the construction and commissioning of nuclear power plants. DEngr thesis, George Washington University, USA.
Stoy, C; Pollalis, S and Schalcher, H R (2008) Drivers for cost estimating in early design: Case study of residential construction. Journal of Construction Engineering and Management, 134(1), pp. 32-39. ISSN 0733-9364
Stoy, C and Schalcher, H R (2007) Residential building projects: Building cost indicators and drivers. Journal of Construction Engineering and Management, 133(2), pp. 139-145. ISSN 0733-9364
Stukhart, G (1987) Construction management responsibilities during design. Journal of Construction Engineering and Management, 113(1), pp. 90-98. ISSN 0733-9364
Sturgill Jr., Roy E (2018) Risk management and practice alignment for utility coordination on transportation projects. PhD thesis, University of Kentucky, USA.
Sturup, Anna Sophie (2010) Managing mentalities of mega projects: The art of government of mega urban transport project. PhD thesis, University of Melbourne, Australia.
Su, Y Y; Hashash, Y M A and Liu, L Y (2006) Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management, 132(12), pp. 1234-1241. ISSN 0733-9364
Su, Y-Y (2010) Construction crew productivity monitoring supported by location awareness technologies. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Subedi, J; Ghimire, R M; Neupane, R P and Amatya, S (2016) Cost difference of buildings in Kathmandu constructed with and without earthquake safer features. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 444-459. ISSN 1759-5916
Subin, Z M; Lombardi, J; Muralidharan, R; Korn, J; Malik, J; Pullen, T; Wei, M and Hong, T (2024) US urban land-use reform: A strategy for energy sufficiency. Buildings & Cities, 5(1), pp. 400-417. ISSN 2632-6655
Subramanyan, H; Sawant, P H and Bhatt, V (2012) Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India. Journal of Construction Engineering and Management, 138(3), pp. 409-421. ISSN 0733-9364
Suckarieh, G (1984) Construction management control with microcomputers. Journal of Construction Engineering and Management, 110(1), pp. 72-78. ISSN 0733-9364
Sugrue, D P (2021) Alternative financing for harbor infrastructure using big data analytics in the great lakes waterway. PhD thesis, University of Michigan, USA.
Suhomlinova, O O (1996) Organizational transformation in the post-Soviet economy: The case of the Russian construction industry, 1985-1993. PhD thesis, Duke University, USA.
Sulaiman, M J (1997) Intesite: Intelligent site layout planning within an object-oriented integrated construction environment. PhD thesis, University of Salford, UK.
Sullivan, J; Asmar, M E; Chalhoub, J and Obeid, H (2017) Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6): 04017009, ISSN 0733-9364
Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Sultan, B and Alaghbari, W (2023) Construction industry sustainable development indicator for low-income developing countries: Yemen as a case study. International Journal of Construction Management, 23(6), pp. 1053-1060. ISSN 1562-3599
Sun, B; Wu, J; You, H and Du, J (2025) Estimating belief updates in AI-driven drone controls for urban search and rescue operations. Journal of Construction Engineering and Management, 151(9): 04025128, ISSN 0733-9364
Sun, C; MacKley, A and Edara, P (2014) Programmatic examination of missouri incentive/disincentive contracts for mitigating work zone traffic impacts. Journal of Construction Engineering and Management, 140(1): 05013004, ISSN 0733-9364
Sun, C and Xu, J (2011) Estimation of time for wenchuan earthquake reconstruction in China. Journal of Construction Engineering and Management, 137(3), pp. 179-187. ISSN 0733-9364
Sun, J; Balakrishnan, S and Zhang, Z (2021) A resource allocation framework for predisaster resilience management of interdependent infrastructure networks. Built Environment Project and Asset Management, 11(2), pp. 284-303. ISSN 2044-124X
Sun, J; Murphy, M R; Hazlett, D G; Shuai, C and Gao, L (2025) Simulation-based framework for predicting construction workforce demand: A comparative analysis with multivariate LSTM-based seq2seq model. Journal of Construction Engineering and Management, 151(6): 04025049, ISSN 0733-9364
Sun, M; Vidalakis, C and Oza, T (2009) A change management maturity model for construction projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Sun, W (2023) A self-localized smart hardhat system for construction 4.0. PhD thesis, Columbia University, USA.
Sun, X (2016) Proposed improvements to the MCAA method for quantifying construction loss of productivity. PhD thesis, University of California, Berkeley, USA.
Sun, Z (2000) Reliability-based method for stability of mine entry design and evaluation. PhD thesis, West Virginia University, USA.
Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing. PhD thesis, Indian Institute of Technology Delhi, India.
Sunkanmi, A B (2023) An integrated conflict management model for the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Surahyo, M and El-Diraby, T E (2009) Schema for interoperable representation of environmental and social costs in highway construction. Journal of Construction Engineering and Management, 135(4), pp. 254-266. ISSN 0733-9364
Suriyanon, N; Sutheerawatthana, P; Rinchumphu, D and Suksawat, R (2025) Carbon footprint assessment of a precast concrete yard: A case study from Thailand. Construction Economics and Building, 25(2), pp. 43-68. ISSN 2204-9029
Susanti, B; Kadarsa, E; Foralisa, M and Juliantina, I (2023) Non-toll revenue potential to increase funding sources for toll road maintenance. Construction Economics and Building, 23(3-4), pp. 170-185. ISSN 2204-9029
Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.
Suárez, J L; Gosselin, L and Lehoux, N (2023) Optimizing modularity of prefabricated residential plumbing systems for construction in remote communities. Journal of Construction Engineering and Management, 149(1): 05022017, ISSN 0733-9364
Swaffield, L M (1998) Improving early cost advice for mechanical and electrical services. PhD thesis, Loughborough University, UK.
Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(2), pp. 132-148. ISSN 0969-9988
Swaffield, L M and Pasquire, C L (1996) A critique of mechanical and electrical services cost planning: Existing methods and published information. Journal of Financial Management of Property and Construction, 1(3), pp. 23-42. ISSN 1366-4387
Swaffield, L M and Pasquire, C L (2000) Improving early cost advice for mechanical and electrical services by considering functions and client/design team communication. Journal of Financial Management of Property and Construction, 5(1-2), pp. 3-13. ISSN 1366-4387
Swei, O (2018) Long-run construction cost trends: Baumol's cost disease and a disaggregate look at building material price dynamics. Journal of Construction Engineering and Management, 144(7): 04018058, ISSN 0733-9364
Swei, O; Gregory, J and Kirchain, R (2017) Probabilistic approach for long-run price projections: Case study of concrete and asphalt. Journal of Construction Engineering and Management, 143(1): 05016018, ISSN 0733-9364
Sweis, R J (1999) A model to assess alternative policies to promote the construction industry in developing countries. PhD thesis, Northwestern University, USA.
Swiggum, K E; Anderson, S D and Russell, J S (1994) Case study of burlington cable-stayed bridge. Journal of Construction Engineering and Management, 120(3), pp. 649-666. ISSN 0733-9364
Syachrani, S (2010) Advanced sewer asset management using dynamic deterioration models. PhD thesis, Oklahoma State University, USA.
Symonds, P; Taylor, J; Mavrogianni, A; Davies, M; Shrubsole, C; Hamilton, I and Chalabi, Z (2017) Overheating in English dwellings: Comparing modelled and monitored large-scale datasets. Building Research & Information, 45(1-2), pp. 195-208. ISSN 0961-3218
Synovec, T M (2020) A strategy to reduce total cost of ownership of the U.S. Air Force's airfield pavements. PhD thesis, Mississippi State University, USA.
Szalay, Z (2008) Modelling building stock geometry for energy, emission and mass calculations. Building Research & Information, 36(6), pp. 557-567. ISSN 0961-3218
Szamocki, N; Kim, M K; Ahn, C R and Brilakis, I (2019) Reducing greenhouse gas emission of construction equipment at construction sites: Field study approach. Journal of Construction Engineering and Management, 145(9): 05019012, ISSN 0733-9364
Sözen, Z and Kucediluk, M A (1999) Secondary subcontracting in the Turkish construction industry. Construction Management and Economics, 17(2), pp. 215-220. ISSN 01446193
Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS approach for automating preconstruction activities. Journal of Construction Engineering and Management, 124(4), pp. 257-262. ISSN 0733-9364
Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost. PhD thesis, University of Michigan, USA.
Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.
Tah, J H M; Aouad, G; Lee, A and Wu, S (2004) Conceptual information modelling for risk analysis and management in an nD-modelling environment. Journal of Construction Procurement, 10(1),
Tah, J H M and Carr, V (2000) A proposal for construction project risk assessment using fuzzy logic. Construction Management and Economics, 18(4), pp. 491-500. ISSN 01446193
Tah, J H M; Thorpe, A and McCaffer, R (1994) A survey of indirect cost estimating in practice. Construction Management and Economics, 12(1), pp. 31-36. ISSN 01446193
Tahir, H A (2015) A project control framework for the Libyan construction industry. PhD thesis, Sheffield Hallam University, UK.
Tait, P D and Swaffield, L M (2003) Construction site waste: The real cost and benefits available from waste reduction. Journal of Financial Management of Property and Construction, 8(1), pp. 3-16. ISSN 1366-4387
Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Talaq, J (2004) Antecedents and consequences of motivation: an examination of motivation as mediator to human and organisational performance. PhD thesis, University of Wolverhampton, UK.
Talebi, S (2019) Improvement of dimensional tolerance management in construction. PhD thesis, University of Huddersfield, UK.
Talhouni, B T K (1990) Measurement and analysis of construction labour productivity. PhD thesis, University of Dundee, UK.
Talley, K G and Torres, A S (2018) Measuring the impact of using daily objectives to provide rapid feedback in construction courses. International Journal of Construction Education and Research, 14(2), pp. 95-117. ISSN 1557-8771
Tam, C M and Tong, T K L (2005) Multiple gmdh models for estimating resource requirements. Construction Innovation, 5(2), pp. 115-131. ISSN 1471-4175
Tam, C M; Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(5-6), pp. 446-452. ISSN 0969-9988
Tam, C M; Tong, T K L and Tse, S L (2004) Modelling hook times of mobile cranes using artificial neural networks. Construction Management and Economics, 22(8), pp. 839-849. ISSN 01446193
Tam, T H; Abdul Rahman, M Z; Harun, S; Shahid, S; Try, S; Jamal, M H; Ismail, Z; Razak, K A; Ghani, M K and Abdul Wahab, Y F (2025) Flood hazard assessment using design rainfall under climate change scenarios in the Kelantan River Basin, Malaysia. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 1-19. ISSN 1759-5908
Tam, V W Y; Le, K N and Le, H N (2008) Using Gaussian and hyperbolic distributions for quality improvement in construction: Case study approach. Journal of Construction Engineering and Management, 134(7), pp. 555-561. ISSN 0733-9364
Tam, V W Y; Liu, L and Le, K N (2023) Modelling and quantitation of embodied, operational and mobile energies of buildings: A holistic review from 2012 to 2021. Engineering, Construction and Architectural Management, 30(9), pp. 4045-4079. ISSN 0969-9988
Tambwe, O T; Aigbavboa, C O and Akinradewo, O (2025) Benefits of construction data risks management in the construction industry. Journal of Engineering, Design and Technology, 23(2), pp. 458-476. ISSN 1726-0531
Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation. PhD thesis, Oklahoma State University, USA.
Tamimi, S T (1989) An influence diagramming based risk analysis system. PhD thesis, University of Colorado at Boulder, USA.
Tan, L; Zhang, Y; Chen, Y and Zhu, T (2023) A multiple-objective decision-support model for lighting maintenance routing considering carbon dioxide emissions and balanced workload. Journal of Construction Engineering and Management, 149(8): 04023063, ISSN 0733-9364
Tan, W (1996) The elasticity of capital-labour substitution in Singapore construction. Construction Management and Economics, 14(6), pp. 537-542. ISSN 01446193
Tan, W (2000) Total factor productivity in Singapore construction. Engineering, Construction and Architectural Management, 7(2), pp. 154-158. ISSN 0969-9988
Tan, Y and Shen, L (2010) A fuzzy competence requirement (FCR) model for competitive bidding strategy. Construction Innovation, 10(1), pp. 75-88. ISSN 1471-4175
Tanaka, M (2008) Essays on durability and the Japanese housing market. PhD thesis, Johns Hopkins University, USA.
Tang, C M and Leung, A Y T (2005) An impartial decision model for financial risk and decision analysis in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Tang, S L; Aoieong, R T and Ahmed, S M (2004) The use of process cost model (PCM) for measuring quality costs of construction projects: Model testing. Construction Management and Economics, 22(3), pp. 263-275. ISSN 01446193
Tang, W; Cui, Q; Zhang, F and Chen, Y (2019) Urban rail-transit project investment benefits based on compound real options and trapezoid fuzzy numbers. Journal of Construction Engineering and Management, 145(1): 05018016, ISSN 0733-9364
Tangtinthai, N (2016) Extraction, use and disposal of construction materials in Great Britain and Thailand. PhD thesis, University of Newcastle upon Tyne, UK.
Tanikawa, H and Hashimoto, S (2009) Urban stock over time: Spatial material stock analysis using 4d-GIS. Building Research & Information, 37(5-6), pp. 483-502. ISSN 0961-3218
Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531
Tansey, P; Spillane, J P and Meng, X (2014) Linking response strategies adopted by construction firms during the 2007 economic recession to Porter's generic strategies. Construction Management and Economics, 32(7-8), pp. 705-724. ISSN 01446193
Tantele, E A (2005) Optimisation of preventative maintenance strategies for reinforced concrete bridges. PhD thesis, University of Surrey, UK.
Tao, Y; Hu, H; Xu, F and Zhang, Z (2023) Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory. Journal of Construction Engineering and Management, 149(6): 04023034, ISSN 0733-9364
Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema. DTech thesis, KTH Royal Institute of Technology, Sweden.
Tarekegn Gurmu, A (2023) Preconstruction phase management practices enhancing labor productivity in multistory building projects. Journal of Construction Engineering and Management, 149(6): 04023032, ISSN 0733-9364
Tas, E and Yaman, H (2005) A building cost estimation model based on cost significant work packages. Engineering, Construction and Architectural Management, 12(3), pp. 251-263. ISSN 0969-9988
Tatum, M C and Terrell, F (2012) Hurricane reconstruction in the United States Gulf Coast. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 199-219. ISSN 1759-5916
Tavafzadeh Haghi, N; Ahmadian Nezhad Monfared, M; Hashemian, L and Bayat, A (2019) Capital cost comparison of pavements comprised of insulation layers: Case study in Edmonton, Canada. Journal of Construction Engineering and Management, 145(7): 04019038, ISSN 0733-9364
Tavakoli, A (1983) Productivity analysis of heavy construction operations. PhD thesis, Georgia Institute of Technology, USA.
Tavakoli, A (1985) Productivity analysis of construction operations. Journal of Construction Engineering and Management, 111(1), pp. 31-39. ISSN 0733-9364
Tavakoli, A (1986) Transient response analysis of a dual cycle system. Journal of Construction Engineering and Management, 112(3), pp. 403-410. ISSN 0733-9364
Tavares, V M M (2022) Life cycle assessment of prefabricated buildings towards a building stock approach. PhD thesis, Universidade de Coimbra, Portugal.
Taylor, J; Salmela, A; Täubel, M; Heimlander, A; Karvonen, A M; Pakkala, T; Lahdensivu, J and Pekkanen, J (2023) Risk factors for moisture damage presence and severity in Finnish homes. Buildings & Cities, 4(1), pp. 708-726. ISSN 2632-6655
Taylor, J M (1981) Development and evaluation of a network scheduling procedure based on utility theory. PhD thesis, Texas A&M University, USA.
Taylor, M D (2010) A definition and valuation of the UK offsite construction sector. Construction Management and Economics, 28(8), pp. 885-896. ISSN 1466433X
Taylor, M D; Wamuziri, S C and Smith, I G N (2001) Strategic mechatronics investment: Understanding the managerial options. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Taylor, R G and Bowen, P A (1987) Building price-level forecasting: An examination of techniques and applications. Construction Management and Economics, 5(1), pp. 21-44. ISSN 01446193
Teixeira, Carla Fernanda Barbosa (2013) Analysis thermal performance of fiber cement tiles treated with white coatings and submitted to water spraying. PhD thesis, Universidade Estadual de Campinas, Brazil.
Teixeira, J M (1993) Contractors management functions: an integrated approach for planning, estimating and control. PhD thesis, Loughborough University, UK.
Teli, D; James, P A B and Jentsch, M F (2015) Investigating the principal adaptive comfort relationships for young children. Building Research & Information, 43(3), pp. 371-382. ISSN 0961-3218
Tembo, C K; Muleya, F and Kanyemba, A (2024) An appraisal of cost management techniques used in the construction industry. International Journal of Construction Management, 24(1), pp. 10-18. ISSN 1562-3599
Tembo, M; Kahanji, C and Mwanaumo, E M (2025) Socio-Political and Macro-Economic Impact of Tender Price Inflation in Zambian Public Construction Projects. Journal of Construction Business and Management, 7(2), pp. 67-97.
Tembo-Silungwe, C K and Khatleli, N (2018) Identification of enablers and constraints of risk allocation using structuration theory in the construction industry. Journal of Construction Engineering and Management, 144(5): 04018021, ISSN 0733-9364
Tembo-Silungwe, C K and Khatleli, N (2022) Development of risk misallocation causal networks using interpretive judgement in the construction industry. International Journal of Construction Management, 22(10), pp. 1935-1949. ISSN 1562-3599
Tenah, K A (1979) Construction management information control systems (CMICS). PhD thesis, Texas A&M University, USA.
Tender, M; Couto, J P; Fuller, P; Demian, P; Chow, V; Vaughan, A; Silva, F and Santos, R (2024) Using virtual reality for occupational safety and health in a UK tunnelling megaproject. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 232-239. ISSN 17514304
Teo, S I E; Zhou, Y and Yeoh, J K W (2025) Indoor wifi path loss model to estimate indoor network coverage considering residential design. Smart and Sustainable Built Environment, 14(5), pp. 1407-1433. ISSN 2046-6099
Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.
Teo, P; Gajanayake, A; Jayasuriya, S; Izaddoost, A; Perera, T; Naderpajouh, N and Wong, P S P (2022) Application of a bottom-up approach to estimate economic impacts of building maintenance projects: Cladding rectification program in Australia. Engineering, Construction and Architectural Management, 29(1), pp. 333-353. ISSN 0969-9988
Teo, P and Love, P E D (2017) Re-examining the association between quality and safety performance in construction: From heterogeneous to homogeneous datasets. Journal of Construction Engineering and Management, 143(6): 04017011, ISSN 0733-9364
Terblanche, R (2022) Understanding financial feasibility studies as an artefact in quantity surveying practice. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Tetteh, P A; Osei-Kyei, R and Tam, V W Y (2025) Strategies for sustainable financing of circular infrastructure projects: A systematic review. Construction Innovation, 25(7), pp. 235-267. ISSN 1471-4175
Thadicaran, A B G (1997) Implementation strategies for water resources projects under uncertainties of completion time. PhD thesis, Colorado State University, USA.
Thaesler-Garibaldi, M P (2005) A methodology to develop an integrated engineering system to estimate quantities for bridge repairs at the pre-design stage. PhD thesis, Georgia Institute of Technology, USA.
Thakur, A; Krishnan K, J and Ansari, A (2025) Powering the transition: Examining factors influencing the intention to adopt electric vehicles. Smart and Sustainable Built Environment, 14(2), pp. 471-488. ISSN 2046-6099
Thal Jr, A E; Cook, J J and White Iii, E D (2010) Estimation of cost contingency for Air Force construction projects. Journal of Construction Engineering and Management, 136(11), pp. 1181-1188. ISSN 0733-9364
Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems. PhD thesis, Aston University, UK.
Thekinen, J D; Pandey, N; Mollaoglu, S; Duva, M; Frank, K and Zhao, D (2023) Detecting information bottlenecks in architecture engineering construction projects for integrative project management. Journal of Construction Engineering and Management, 149(12): 04023135, ISSN 0733-9364
Thennakoon, P. N.; Jayasena, S.; Rathnasinghe, A. P. and Ekanayake, A. (2025) Regulatory framework for unsolicited PPPs in infrastructure developments: Barriers and strategies. Construction Innovation, 26(5), pp. 1443-1468. ISSN 1471-4175
Theodorakopoulos, T F (2017) Integrated cost management system for delivering construction projects. PhD thesis, Loughborough University, UK.
Thiele, Brett James (2024) A financial decision support tool for improved project and portfolio profit performance in project-based organisations. PhD thesis, University of New South Wales, Australia.
Thiengburanathum, P (2003) Design of construction production systems: Representation, taxonomy, and design framework. PhD thesis, University of Colorado at Boulder, USA.
Thomas, A V and Sudhakumar, J (2014) Modelling masonry labour productivity using multiple regression. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Thomas, H R (1991) Labor productivity and work sampling: The bottom line. Journal of Construction Engineering and Management, 117(3), pp. 423-444. ISSN 0733-9364
Thomas, H R (2000) Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4), pp. 261-267. ISSN 0733-9364
Thomas, H R and Daily, J (1983) Crew performance measurement via activity sampling. Journal of Construction Engineering and Management, 109(3), pp. 309-320. ISSN 0733-9364
Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364
Thomas, H R; Guevara, J M and Gustenhoven, C T (1984) Improving productivity estimates by work sampling. Journal of Construction Engineering and Management, 110(2), pp. 178-188. ISSN 0733-9364
Thomas, H R and Horman, M J (2006) Fundamental principles of workforce management. Journal of Construction Engineering and Management, 132(1), pp. 97-104. ISSN 0733-9364
Thomas, H R; Mathews, C T and Ward, J G (1986) Learning curve models of construction productivity. Journal of Construction Engineering and Management, 112(2), pp. 245-258. ISSN 0733-9364
Thomas, H R and Raynar, K A (1997) Scheduled overtime and labor productivity: Quantitative analysis. Journal of Construction Engineering and Management, 123(2), pp. 181-188. ISSN 0733-9364
Thomas, H R; Riley, D R and Messner, J I (2005) Fundamental principles of site material management. Journal of Construction Engineering and Management, 131(7), pp. 808-815. ISSN 0733-9364
Thomas, H R and Sakarcan, A S (1994) Forecasting labor productivity using factor model. Journal of Construction Engineering and Management, 120(1), pp. 228-239. ISSN 0733-9364
Thomas, H R; Sanvido, V E and Sanders, S R (1989) Impact of material management on productivity: a case study. Journal of Construction Engineering and Management, 115(3), pp. 370-384. ISSN 0733-9364
Thomas, S R; Lee, S H; Spencer, J D; Tucker, R L and Chapman, R E (2004) Impacts of design/information technology on project outcomes. Journal of Construction Engineering and Management, 130(4), pp. 586-597. ISSN 0733-9364
Thomson, D S (2000) The development of packaged, reusable building services components: A pilot study in the UK National Health Service. PhD thesis, Heriot-Watt University, UK.
Thorpe, T (1992) Information flow in house building organisations. PhD thesis, Loughborough University, UK.
Thunberg, M and Fredriksson, A (2018) Bringing planning back into the picture: how can supply chain planning aid in dealing with supply chain-related problems in construction? Construction Management and Economics, 36(8), pp. 425-442. ISSN 01446193
Thuse, D G (1988) Road transport investment model using dynamic programming. PhD thesis, Indian Institute of Technology, Bombay, India.
Tian, F.; Zeng, N.; Li, Z.; Ge, Q.; Wang, Q. and Li, Q. (2026) Defect trigger identification in a construction digital twin using quality linked data and iterative deviation computation. Journal of Construction Engineering and Management, 152(8): 04026105, ISSN 0733-9364
Tian, S; Abdalla, A; Zhang, G; Tang, Y and Cao, X (2025) Pathways of construction dispute formation in China: A DEMATEL, AISM, and MICMAC-based approach. Journal of Construction Engineering and Management, 151(10): 05025013, ISSN 0733-9364
Tian, Z; Yu, Y; Xu, F and Zhang, Z (2023) Dynamic hazardous proximity zone design for excavator based on 3D mechanical arm pose estimation via computer vision. Journal of Construction Engineering and Management, 149(7): 04023048, ISSN 0733-9364
Tidakbi, Emmanuel Tinakpa (2002) Risk management in the public sector: The case of the National Health Service, United Kingdom. PhD thesis, University College London, UK.
Tiellemans, N; Kemperman, A; Maussen, S and Arentze, T (2022) The influence of group decision-making on residents' preferences for sustainable energy measures of dwellings. Building Research & Information, 50(4), pp. 410-423. ISSN 0961-3218
Tien, I (2014) Bayesian network methods for modeling and reliability assessment of infrastructure systems. PhD thesis, University of California, Berkeley, USA.
Tilde, A I and Fernando, N G (2024) Knowledge, attitude and practices of energy utilisation behaviours: A study of residential building occupants. Built Environment Project and Asset Management, 14(3), pp. 349-365. ISSN 2044-124X
Ting Sham, H; Foo Sing, T and Tsai, I C (2009) Are there efficiency gains for larger Asian REITS? Journal of Financial Management of Property and Construction, 14(3), pp. 231-247. ISSN 1366-4387
Tino Balestra, C E; Alessi Reichert, T; Savaris, G; Pansera, W A and Medeiros-Junior, R A (2020) Nondestructive method for estimation of chloride profiles: Correlation between electrical resistivity and holliday-empirical equation. Journal of Construction Engineering and Management, 146(10): 04020119, ISSN 0733-9364
Tirado Fabian, D R (2022) Contribution to the development of a model for the analysis of stocks and flows of waste materials from buildings at a territorial scale. DSc thesis, ETH Zürich, Switzerland.
Tiruneh, Getaneh Gezahegne (2021) Hybrid neuro-fuzzy model for construction organizational competencies and performance. PhD thesis, University of Alberta, Canada.
Tischer, T E and Kuprenas, J A (2003) Bridge falsework productivity: measurement and influences. Journal of Construction Engineering and Management, 129(3), pp. 243-250. ISSN 0733-9364
Tixier, A J-P (2015) Leveraging unstructured construction injury reports to predict safety outcomes and model safety risk using natural language processing, machine learning, and probability theory. PhD thesis, University of Colorado at Boulder, USA.
Tochukwu, M G (2018) The development of 5D BIM framework to facilitate costing in contractor-led projects. PhD thesis, University of Wolverhampton, UK.
Toh, S C L; Wong, S Y and Ding, C S (2026) The impact of artificial intelligence on the quantity surveying profession in sarawak, Malaysia. Journal of Engineering, Design and Technology, 24(1), pp. 171-192. ISSN 1726-0531
Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364
Tokede, O and Ahiaga-Dagbui, D (2016) Evaluating the whole-life cost implication of revocability and disruption in office retrofit building projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Tokede, O; Boggavarapu, M K and Wamuziri, S (2023) Assessment of building retrofit scenarios using embodied energy and life cycle impact assessment. Built Environment Project and Asset Management, 13(5), pp. 666-681. ISSN 2044-124X
Tokede, O O (2016) Developing whole-life cost models for retrofit options in office buildings. PhD thesis, Edinburgh Napier University, UK.
Tokede O, S B B A (2013) Preserving continuity in whole-life cost models for net-zero carbon buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.
Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea. DEng thesis, George Washington University, USA.
Toma, H. M.; Abdelazim, A. N. and Ibrahim, A. H. (2026) Assessment of estimation performance for activities' cost and time in construction projects using statistical process control. Engineering, Construction and Architectural Management, 33(4), pp. 2669-2695. ISSN 0969-9988
Tomlinson, D P and Rhomberg, E J (1988) Contract officer in military service contracts. Journal of Construction Engineering and Management, 114(3), pp. 441-457. ISSN 0733-9364
Tomlinson, J (1998) A premises occupancy cost forecasting model. PhD thesis, University of Liverpool, UK.
Torcellini, P; Pless, S and Leach, M (2014) A pathway for net-zero energy buildings: Creating a case for zero cost increase. Building Research & Information, 43(1), pp. 25-33. ISSN 0961-3218
Touran, A (1993) Probabilistic cost estimating with subjective correlations. Journal of Construction Engineering and Management, 119(1), pp. 58-71. ISSN 0733-9364
Touran, A (2003) Probabilistic model for cost contingency. Journal of Construction Engineering and Management, 129(3), pp. 280-284. ISSN 0733-9364
Touran, A (2010) Probabilistic approach for budgeting in portfolio of projects. Journal of Construction Engineering and Management, 136(3), pp. 361-366. ISSN 0733-9364
Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364
Touran, A; Sheahan, T C and Ozcan, E (1997) Rational equipment selection method based on soil conditions. Journal of Construction Engineering and Management, 123(1), pp. 85-88. ISSN 0733-9364
Touran, A and Suphot, L (1997) Rank correlations in simulating construction costs. Journal of Construction Engineering and Management, 123(3), pp. 297-301. ISSN 0733-9364
Touran, A and Wiser, E P (1992) Monte Carlo technique with correlated random variables. Journal of Construction Engineering and Management, 118(2), pp. 258-272. ISSN 0733-9364
Towner, M and Baccarini, D (2008) Risk pricing in construction tenders: how, who, what. Construction Economics and Building, 8(1), pp. 49-60. ISSN 2204-9029
Tran, H; Robert, D; Gunarathna, P and Setunge, S (2024) Estimating cost of bridge closure for bridge network rehabilitation priorities. Journal of Construction Engineering and Management, 150(7): 04024071, ISSN 0733-9364
Tran, Hanh Van (2013) Contractor internal profiling of owners. PhD thesis, University of New South Wales, Australia.
Traynor, E H (1980) The application of factor analysis in the design of a cost control system. Construction Papers, 1(1), pp. 29-43. ISSN 0144-8587
Trinh, M T (2018) Developing resilient safety culture for construction projects in Vietnam. PhD thesis, Western Sydney University, Australia.
Trinh, M T; Feng, Y and Jin, X (2018) Conceptual model for developing resilient safety culture in the construction environment. Journal of Construction Engineering and Management, 144(7): 06018003, ISSN 0733-9364
Trinh, M T; Feng, Y and Mohamed, S (2019) Framework for measuring resilient safety culture in Vietnam's construction environment. Journal of Construction Engineering and Management, 145(2): 04018127, ISSN 0733-9364
Tripathi, K K (2018) Critical success factors for construction organizations in India. PhD thesis, Indian Institute of Technology Delhi, India.
Tripathi, K K and Jha, K N (2018) Application of fuzzy preference relation for evaluating success factors of construction organisations. Engineering, Construction and Architectural Management, 25(6), pp. 758-779. ISSN 0969-9988
Tripathi, K K and Jha, K N (2019) An empirical study on factors leading to the success of construction organizations in India. International Journal of Construction Management, 19(3), pp. 222-239. ISSN 1562-3599
Troive, S (1998) Structural LCC design of concrete bridges. DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.
Trost, S M (1998) A quantitative model for predicting the accuracy of early cost estimates for construction projects in the process industry. PhD thesis, Oklahoma State University, USA.
Trost, S M and Oberlender, G D (2003) Predicting accuracy of early cost estimates using factor analysis and multivariate regression. Journal of Construction Engineering and Management, 129(2), pp. 198-204. ISSN 0733-9364
Truong-Hong, L; Lindenbergh, R and Nguyen, T A (2022) Structural assessment using terrestrial laser scanning point clouds. International Journal of Building Pathology and Adaptation, 40(3), pp. 345-379. ISSN 23984708
Tsai, M-T (2008) Real option-based procurement for transportation services. PhD thesis, University of California, Irvine, USA.
Tsao, C C Y (2005) Use of work structuring to increase performance of project-based production systems. PhD thesis, University of California, Berkeley, USA.
Tse, R Y C; Ganesan, S and So, H M (1998) Property cycles in Hong Kong: Causes and impacts. Journal of Financial Management of Property and Construction, 3(2), pp. 2-26. ISSN 1366-4387
Tse, R Y C; Ho, C W and Ganesan, S (1999) Matching housing supply and demand: An empirical study of Hong Kong's market. Construction Management and Economics, 17(5), pp. 625-633. ISSN 01446193
Tse, R Y C and Love, P E D (2003) An economic analysis of the effect of delays on project costs. Journal of Construction Research, 4(2), pp. 155-160. ISSN 1609-9451
Tseladikae, T.; Agumba, J.; Ochieng, G.; Adebowale, O. J. and Edwards, D. (2026) Correlation analysis of project management practices and performance outcomes in social housing projects. International Journal of Construction Management, 26(10), pp. 2085-2100. ISSN 1562-3599
Tseng, A A; Tanaka, M; Leeladharan, B and Choi, J G (2003) Rotating laser-based system for full profile measurement. Construction Innovation, 3(2), pp. 97-110. ISSN 1471-4175
Tseng, C L; Zhao, T and Fu, C C (2009) Contingency estimation using a real options approach. Construction Management and Economics, 27(11), pp. 1073-1087. ISSN 1466433X
Tshehla, M F and Mukudu, E (2020) Addressing constraints for effective project finance for infrastructure projects in emerging economies: The case of Zimbabwe. Journal of Construction Business and Management, 4(1), pp. 48-59. ISSN 2521-0165
Tsimberdonis, A I and Murphree, E L (1994) Equipment management through operational failure costs. Journal of Construction Engineering and Management, 120(3), pp. 522-535. ISSN 0733-9364
Tsimopoulou, V (2015) Economic optimisation of flood risk management projects. PhD thesis, Delft University of Technology, Netherlands.
Tucker, S N (1986) Formulating construction cash flow curves using a reliability theory analogy. Construction Management and Economics, 4(3), pp. 179-188. ISSN 01446193
Tucker, S N (1988) A single alternative formula for department of health and social security S-curves. Construction Management and Economics, 6(1), pp. 13-23. ISSN 01446193
Tudor, L G (1987) Modeling OSHA's inspection decision and the compliance decision of the firm. PhD thesis, George Washington University, USA.
Tuffaha, F M; Assaf, S; Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), pp. 195-213. ISSN 2044-124X
Tummalapudi, M; Killingsworth, J; Harper, C and Mehaney, M (2021) US construction industry managerial strategies for economic recession and recovery: A Delphi study. Journal of Construction Engineering and Management, 147(11): 04021146, ISSN 0733-9364
Tunji-Olayeni, P; Kajimo-Shakantu, K and Ayodele, T O (2024) Factors influencing the intention to adopt green construction: An application of the theory of planned behaviour. Smart and Sustainable Built Environment, 13(2), pp. 291-308. ISSN 2046-6099
Tunji-Olayeni, P F; Kajimo–Shakantu, K; Ayodele, T O and Philips, B I (2023) Students' perception of sustainable construction: Accelerating progress towards construction education for sustainable development. International Journal of Construction Management, 23(2), pp. 276-285. ISSN 1562-3599
Turner, J P (1992) Constructability for drilled shafts. Journal of Construction Engineering and Management, 118(1), pp. 77-93. ISSN 0733-9364
Tutesigensi, A; Kibwami, N and Matege, S B (2021) The status of value management practice on construction projects in Uganda and strategies for improvement. Journal of Construction in Developing Countries, 26(2), pp. 251-267. ISSN 1823-6499
Türkakın, O H; Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), pp. 2893-2909. ISSN 0969-9988
Uddin, M M (2011) Robust statistical methods for non-normal quality assurance data analysis in transportation projects. PhD thesis, University of Kentucky, USA.
Udofia, W U; Hadikusumo, B H W and Santoso, D S (2015) Road project termination and rebidding strategies in Nigeria. Journal of Financial Management of Property and Construction, 20(3), pp. 208-234. ISSN 1366-4387
Uhanovita A.C, N; K.A.T.O, R and Parameswaran, A (2025) Poka-yoke to minimise variations: A framework for building projects. Construction Innovation, 25(3), pp. 972-993. ISSN 1471-4175
Uher, T E (1996) Cost estimating practices in Australian construction. Engineering, Construction and Architectural Management, 3(1-2), pp. 83-95. ISSN 0969-9988
Uher, Thomas Edward (1990) The effect of risks and uncertainties on subcontract bid prices. Unpublished PhD thesis, University of New South Wales, Australia.
Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.
Umar, T (2020) Developing toolkits and guidelines to improve safety performance in the construction industry in Oman. PhD thesis, London South Bank University, UK.
Umer, Muhammad (2025) Spotting inventory: Autonomous item localization on active construction sites using a boston dynamics spot® with Bayesian filtering and object detection. PhD thesis, Auburn University, USA.
Usman, A M and Abdullah, K (2024) Development of comprehensive energy usage impact and carbon footprint parameters for green building life cycle assessment. Journal of Engineering, Design and Technology, 22(4), pp. 1057-1081. ISSN 1726-0531
Vahabi, A; Nasirzadeh, F and Mills, A (2022) Impact of project briefing clarity on construction project performance. International Journal of Construction Management, 22(13), pp. 2504-2516. ISSN 1562-3599
Vahabi, A; Nasirzadeh, F and Mills, A (2022) Influence of briefing clarity on construction projects: A fuzzy hybrid simulation approach. Construction Management and Economics, 40(4), pp. 278-295. ISSN 01446193
Vahabi, A; Nasirzadeh, F and Mills, A (2023) Assessing the impact of project brief clarity using project definition rating index tool and system dynamic. Engineering, Construction and Architectural Management, 30(2), pp. 697-713. ISSN 0969-9988
Vahdatmanesh, M and Firouzi, A (2020) Construction material supply risk management using Asian option contracts: The case of a pipeline project. Engineering, Construction and Architectural Management, 27(10), pp. 3395-3414. ISSN 0969-9988
Vaidya, R (1981) The role of the construction industry in economic development: The case of Nepal. PhD thesis, Cornell University, USA.
Van de Ruitenbeek, H K M (2012) Evolutionary, unconscious design support for the architectural, engineering and construction industry. PhD thesis, Delft University of Technology, Netherlands.
Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.
Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.
Vasenin, M (2022) A data-driven approach to green investments: environmental performance, mispricing, and momentum. PhD thesis, Northumbria University, UK.
Vasserman, S (2019) Essays on industrial organization. PhD thesis, Harvard University, USA.
Vazquez, F and Allen, S (2004) Private sector participation in the delivery of highway infrastructure in central America and Mexico. Construction Management and Economics, 22(7), pp. 745-754. ISSN 01446193
Vecino, G A (2016) The feasibility of using web-based technology for the management of dredging projects. PhD thesis, University of Maryland, College Park, USA.
Vegad, K; Madurwar, M and Ralegaonkar, R (2014) Application of AV-ERP system for on-site project monitoring. Construction Innovation, 14(4), pp. 518-531. ISSN 1471-4175
Venkateswaran, C B and Murugasan, R (2017) Time delay and cost overrun of road over bridge construction projects in India. Journal of Construction in Developing Countries, 22(S1), pp. 79-96. ISSN 1823-6499
Ventovuori, T (2007) Elements of sourcing strategy in facilites management services : decision categories and choices. PhD thesis, Helsinki University of Technology, Finland.
Verburg, Willem Hendrik (2021) The development of a design-for-assembly method for construction and infrastructure projects. PhD thesis, University of Twente, Netherlands.
Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.
Verma, S; Mandal, S N; Robinson, S; Bajaj, D and Saxena, A (2021) Investment appraisal and financial benefits of corporate green buildings: A developing economy case study. Built Environment Project and Asset Management, 11(2), pp. 392-408. ISSN 2044-124X
Vermande, H M and Van Mulligen, P H (1999) Construction costs in the Netherlands in an international context. Construction Management and Economics, 17(3), pp. 269-283. ISSN 01446193
Vick, S (2018) Automated spatial progress monitoring for asphalt road construction projects. PhD thesis, University of Cambridge, UK.
Victar, H C; Perera, B A K S; Palihakkara, A D and Dewagod, K G (2024) Roles and competencies of quantity surveyors in achieving a circular built environment: An investigation according to 3r principles. Smart and Sustainable Built Environment, 13(4), pp. 1015-1040. ISSN 2046-6099
Victoria, M; Perera, S and Davies, A (2015) Developing an early design stage embodied carbon prediction model: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Victoria, M F (2017) Developing decision support models for early stage embodied carbon management in buildings. PhD thesis, Northumbria University, UK.
Victoria, M F and Perera, S (2018) Managing embodied carbon in buildings: A Pareto approach. Built Environment Project and Asset Management, 8(5), pp. 504-514. ISSN 2044-124X
Victoria, M F; Perera, S; Davies, A and Fernando, N (2017) Carbon and cost critical elements: A comparative analysis of two office buildings. Built Environment Project and Asset Management, 7(5), pp. 460-470. ISSN 2044-124X
Vieira, P M d S (2007) Environmental assessment of office buildings. PhD thesis, University of California, Berkeley, USA.
Viet-Ngu, H; Susilawati, C and Joko Purnomo, R (2024) Analysis of productivity performance of real estate and construction firms in Indonesia. Construction Management and Economics, 42(3), pp. 215-228. ISSN 01446193
Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988
Vijay, V; Chandra, R and Subbarao, P M V (2022) Biomass as a means of achieving rural energy self-sufficiency: A concept. Built Environment Project and Asset Management, 12(3), pp. 382-400. ISSN 2044-124X
Viles, E; Rudeli, N C and Santilli, A (2020) Causes of delay in construction projects: A quantitative analysis. Engineering, Construction and Architectural Management, 27(4), pp. 917-935. ISSN 0969-9988
Visser, A T (1981) An evaluation of unpaved road performance and maintenance. PhD thesis, University of Texas at Austin, USA.
Vitorio Junior, P C and Kripka, M (2021) Fair wage potential as a tool for social assessment in building projects. Engineering, Construction and Architectural Management, 28(4), pp. 1295-1318. ISSN 0969-9988
Vogl, B and Abdel-Wahab, M (2015) Measuring the construction industry's productivity performance: Critique of international productivity comparisons at industry level. Journal of Construction Engineering and Management, 141(4): 04014085, ISSN 0733-9364
Vojinovic, Z and Kecman, V (2001) Modelling empirical data to support project cost estimating: Neural networks versus traditional methods. Construction Innovation, 1(4), pp. 227-243. ISSN 1471-4175
Volmink, P (2018) The treatment of non-responsive bids in South African public procurement law. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Votto, R; Lee Ho, L and Berssaneti, F (2020) Applying and assessing performance of earned duration management control charts for EPC project duration monitoring. Journal of Construction Engineering and Management, 146(3): 04020001, ISSN 0733-9364
Vu, H A; Cu, V H; Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(6), pp. 1018-1039. ISSN 0969-9988
Vyas, G S; Jha, K N and Patel, D A (2016) Enhancement of greenness of new construction using the DEA. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Vyčítal, M (2019) On BIM based automatized nD modelling for construction management. PhD thesis, Czech Technical University, Czech Republic.
Wachira, N; Root, D; Bowen, P and Olima, W (2008) Changing craft skills in the Kenyan construction sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Wahab, A (2024) Integrating building information modeling (BIM) and blockchain technology in the pre-construction planning processes. PhD thesis, Mississippi State University, USA.
Wahab, A and Wang, J (2022) Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation. Engineering, Construction and Architectural Management, 29(2), pp. 702-715. ISSN 0969-9988
Wahalathantri, B; Lokuge, W; Karunasena, W and Setunge, S (2018) Quantitative assessment of flood discharges and floodway failures through cross-cultivation of advancement in knowledge and traditional practices. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 435-456. ISSN 1759-5916
Waldman, B; Huang, M and Simonen, K (2020) Embodied carbon in construction materials: A framework for quantifying data quality in epds. Buildings & Cities, 1(1), pp. 625-636. ISSN 2632-6655
Walker, A and Hughes, W P (1986) A conventionally-managed project: A systems- based case study. Construction Management and Economics, 4(1), pp. 57-74. ISSN 01446193
Walker, D and Jacobsson, M (2014) A rationale for alliancing within a public-private partnership. Engineering, Construction and Architectural Management, 21(6), pp. 648-673. ISSN 0969-9988
Walker, G (1999) A critical analysis into the factors that determine project management success: The case in railway engineering projects. PhD thesis, London South Bank University, UK.
Walker, G; Naoum, S and Howes, R (1997) Determinants of project management success. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Wall, D M (1997) Distributions and correlations in Monte Carlo simulation. Construction Management and Economics, 15(3), pp. 241-258. ISSN 01446193
Walsh, K D; Houston, W N and Houston, S L (1997) Field implications of current compaction specification design practices. Journal of Construction Engineering and Management, 123(4), pp. 363-370. ISSN 0733-9364
Walsh, K D; Sawhney, A and Brown Iv, A (2005) International comparison of cost for the construction sector: Purchasing power parity. Journal of Construction Engineering and Management, 131(2), pp. 160-167. ISSN 0733-9364
Walsh, K D; Sawhney, A and Vachris, M A (2006) Improving inter-spatial comparison of construction costs. Engineering, Construction and Architectural Management, 13(2), pp. 123-135. ISSN 0969-9988
Walshaw, D (1991) Statistical analysis of wind speeds. PhD thesis, University of Sheffield, UK.
Walters, R; Jaselskis, E; Zhang, J; Mueller, K and Kaewmoracharoen, M (2008) Using scanning lasers to determine the thickness of concrete pavement. Journal of Construction Engineering and Management, 134(8), pp. 583-591. ISSN 0733-9364
Wamuziri, S (2013) Factors that influence safety culture in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 219-231. ISSN 17514312
Wandahl, S; Pérez, C T; Salling, S; Neve, H H; Lerche, J and Petersen, S (2021) The impact of construction labour productivity on the renovation wave. Construction Economics and Building, 21(3), pp. 11-32. ISSN 2204-9029
Wandahl, S and Skovbogaard, J (2017) Towards improving productivity on refurbishment projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Wang, J.; Qu, Z.; Lee, C. Y. and Skitmore, M. (2025) Highway construction cost index forecasting: A hybrid VMD–LSTM–GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193
Wang, J; Qu, Z and Skitmore, M (2026) Predicting construction cost index using a VMD-GRU framework with the mhsa mechanism. Journal of Construction Engineering and Management, 152(1): 04025236, ISSN 0733-9364
Wang, L.; Yuan, J.; Su, S.; Weng, S. and Hu, F. (2026) Vision-based progress compliance and worker health monitoring in concrete pouring and vibration. Journal of Construction Engineering and Management, 152(10): 04026162, ISSN 0733-9364
Wang, Y.; Zhao, W.; Cui, W. and Zhou, G. (2026) Comparison of five meta-heuristic algorithms in layout optimization of multiple tower cranes. Engineering, Construction and Architectural Management, 33(7), pp. 5849-5873. ISSN 0969-9988
Wang, Z; Hu, T; Liu, J; Xia, B and Chileshe, N (2025) Spatial differences, evolutionary characteristics and driving factors on economic resilience of the construction industry: Evidence from China. Engineering, Construction and Architectural Management, 32(10), pp. 6888-6916. ISSN 0969-9988
Wang, Z; Yan, X; Liu, Q; Ma, X and Li, H (2026) Vision-based collision prevention on construction sites: Integrating trajectory prediction and uncertainty modeling. Journal of Construction Engineering and Management, 152(1): 04025214, ISSN 0733-9364
Wang, C; Gao, F; Cui, B; Huang, M M; Wu, M; Mao, L and Zheng, A (2024) Geometric quality assessment of precast concrete (PC) elements based on 3D structural light scanning. Architectural Engineering and Design Management, 20(2), pp. 303-319. ISSN 1745-2007
Wang, C H and Mei, Y H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(2), pp. 147-157. ISSN 01446193
Wang, G (1998) Study of construction project cost control information system. Unpublished PhD thesis, Tongji University, China.
Wang, H and Meng, X (2016) Improving information/knowledge management through the use of BIM: A literature review. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), pp. 47-63. ISSN 1557-8771
Wang, J; Qu, Z; Lee, C Y and Skitmore, M (2025) Highway construction cost index forecasting: A hybrid VMD-LSTM-GRU method. Construction Management and Economics, 43(10), pp. 849-863. ISSN 0144-6193
Wang, L; Lee, J; Nimawat, J; Han, K and Gupta, A (2024) Integrated 4D design change management model for construction projects. Journal of Construction Engineering and Management, 150(5): 04024023, ISSN 0733-9364
Wang, L; Zhang, P; Zhang, P; Li, R; Zhang, Y and Wu, Y (2018) A systematic approach for public-private partnership projects CSFs evaluation. Engineering, Construction and Architectural Management, 25(9), pp. 1127-1145. ISSN 0969-9988
Wang, N and Horner, M (2007) CSI model for estimating road maintenance projects. Construction Management and Economics, 25(12), pp. 1269-1281. ISSN 1466433X
Wang, N and Horner, R M W (2007) Fuzzy rule based system approach to assess cleaning costs of carpet flooring. Journal of Financial Management of Property and Construction, 12(1), pp. 25-36. ISSN 1366-4387
Wang, N; Horner, R M W and El-Haram, M (2004) Fuzzy logic approach to a generic elemental whole life costing model. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Wang, P; Wang, K; Huang, Y and Fenn, P (2025) Probability, formation, and prediction of large-size construction cost overruns governed by a power-law distribution. Journal of Construction Engineering and Management, 151(6): 04025062, ISSN 0733-9364
Wang, P; Wang, K; Huang, Y; Fenn, P and Stewart, I (2022) Auditing construction cost from an in-process perspective based on a Bayesian predictive model. Journal of Construction Engineering and Management, 148(4): 04022003, ISSN 0733-9364
Wang, Q (2017) Automated geometry quality assessment of precast concrete elements using 3D laser scan data. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Wang, Q and Shi, Q (2019) The incentive mechanism of knowledge sharing in the industrial construction supply chain based on a supervisory mechanism. Engineering, Construction and Architectural Management, 26(6), pp. 989-1003. ISSN 0969-9988
Wang, R C and Liang, T F (2004) Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22(10), pp. 1047-1056. ISSN 01446193
Wang, R D; Zayed, T; Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(9): 04024121, ISSN 0733-9364
Wang, S; Zhu, S and Yuen, P L (2021) Assessment of ground-borne vibration impact on nearby underground facilities induced by ground surface excavation. Journal of Construction Engineering and Management, 147(7): 04021071, ISSN 0733-9364
Wang, W (2010) Multivariate stochastic copula-based deterioration models in infrastructure economic risk management. DES thesis, Columbia University, USA.
Wang, W C (2002) Sim-utility: Model for project ceiling price determination. Journal of Construction Engineering and Management, 128(1), pp. 76-84. ISSN 0733-9364
Wang, W C (2004) Electronic-based procedure for managing unbalanced bids. Journal of Construction Engineering and Management, 130(3), pp. 455-460. ISSN 0733-9364
Wang, W C and Demsetz, L A (2000) Model for evaluating networks under correlated uncertainty: netcor. Journal of Construction Engineering and Management, 126(6), pp. 458-466. ISSN 0733-9364
Wang, X; Li, J; Wang, R; Zhang, J and Ma, G (2025) Automated evaluation and optimization of subgrade construction based on intelligent compaction. Journal of Construction Engineering and Management, 151(9): 04025127, ISSN 0733-9364
Wang, X; Shi, L; Wang, B and Kan, M (2020) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(2), pp. 483-501. ISSN 0969-9988
Wang, Xi (2018) Assessing the application of the unmanned aerial systems (uas) in earthwork volume measurement. PhD thesis, University of Kentucky, USA.
Wang, Y (2017) Zero incident safety management for continued safety improvement. PhD thesis, Polytechnic Institute of New York University, USA.
Wang, Y; Goodrum, P M; Haas, C; Glover, R and Vazari, S (2010) Analysis of the benefits and costs of construction craft training in the United States based on expert perceptions and industry data. Construction Management and Economics, 28(12), pp. 1269-1285. ISSN 1466433X
Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2008) Craft training issues in American industrial and commercial construction. Journal of Construction Engineering and Management, 134(10), pp. 795-803. ISSN 0733-9364
Wang, Y; Zhu, S and Wong, A S T (2014) Cooling time estimation of newly placed hot-mix asphalt pavement in different weather conditions. Journal of Construction Engineering and Management, 140(5): 04014009, ISSN 0733-9364
Wang, Y; Zuo, J; Pan, M; Tu, B; Chang, R D; Liu, S; Xiong, F and Dong, N (2024) Cost prediction of building projects using the novel hybrid RA-ANN model. Engineering, Construction and Architectural Management, 31(6), pp. 2563-2582. ISSN 0969-9988
Wang, Y-R (2002) Applying the PDRI in project risk management. PhD thesis, University of Texas at Austin, USA.
Wang, Z; Han, F; Xia, B; Liu, J and Zhang, C (2023) Regional differences and heterogeneity of construction and demolition waste with economic growth: Evidence from China. Construction Management and Economics, 41(1), pp. 44-59. ISSN 01446193
Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation, 19(2), pp. 280-294. ISSN 1471-4175
Wang, Z; Xie, W and Liu, J (2022) Regional differences and driving factors of construction and demolition waste generation in China. Engineering, Construction and Architectural Management, 29(6), pp. 2300-2327. ISSN 0969-9988
Wani, D (1997) Strategies to increase the degree of participation of local companies in construction projects in developing countries. PhD thesis, University of Leeds, UK.
Wanigarathna, N; Xie, Y; Henjewele, C; Morga, M and Jones, K (2025) Machine learning application to disaster damage repair cost modelling of residential buildings. Construction Management and Economics, 43(4), pp. 302-322. ISSN 0144-6193
Wanous, M (2000) A neurofuzzy expert system for competitive tendering in civil engineering. PhD thesis, University of Liverpool, UK.
Wanous, M; Boussabaine, A H and Lewis, J (1998) Tendering factors considered by Syrian contractors. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Wanous, M; Boussabaine, H and Lewis, J (2004) A neurofuzzy decision-support model for mark-up estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Waqar, A; Othman, I B and Mansoor, M S (2025) Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: Mediating role of project control. Engineering, Construction and Architectural Management, 32(9), pp. 6095-6114. ISSN 0969-9988
Waqar, A. and Shafiq, N. (2026) Impact of digital twin technology implementation on the lifecycle management of structural assets. Engineering, Construction and Architectural Management, 33(7), pp. 5715-5736. ISSN 0969-9988
Ward, B (2015) Integrated asset management systems for water infrastructure. EngD thesis, University of Exeter, UK.
Ward, S and Chapman, C (2008) Stakeholders and uncertainty management in projects. Construction Management and Economics, 26(6), pp. 563-577. ISSN 1466433X
Waroonkun, Tanut (2007) Modelling international technology transfer in Thai construction projects. PhD thesis, Griffith University, Thailand.
Warrier, G A and Palaniappan, S (2025) Uncertainty in the embodied energy assessment of buildings: a case of EWS type low-cost house in India. International Journal of Construction Management, 25(8), pp. 911-922. ISSN 1562-3599
Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement. PhD thesis, KTH Royal Institute of Technology, Sweden.
Warszawski, A (1983) Planning and organization of research in building. Journal of Construction Engineering and Management, 109(3), pp. 261-275. ISSN 0733-9364
Warszawski, A (2003) Analysis of costs and benefits of tall buildings. Journal of Construction Engineering and Management, 129(4), pp. 421-430. ISSN 0733-9364
Waskett, P R (1999) Management of the building design process with the analytical design planning technique. PhD thesis, Loughborough University, UK.
Watson, S (2004) Improving the implementation of environmental strategies in the design of buildings: Towards a life-cycle based, front loaded, framework for building environmental assessment during design. PhD thesis, University of Queensland, Australia.
Watters, J S J (1985) The number of bidders, concentration ratios and markets in the highway construction industry. PhD thesis, University of Missouri - Columbia, USA.
Watton, J; Unterhitzenberger, C; Locatelli, G and Invernizzi, D C (2023) The cost drivers of infrastructure projects: Definition, classification, and conceptualization. Journal of Construction Engineering and Management, 149(11): 03123006, ISSN 0733-9364
Waziri, B S (2018) Pareto analysis of critical risk factors of build operate and transfer projects in Nigeria. Journal of Construction Business and Management, 2(1), pp. 33-40. ISSN 2521-0165
Weber, R E (2024) Spatial computing for building performance and design. PhD thesis, Massachusetts Institute of Technology, USA.
Weerasekara, G K T; Shandraseharan, A; Perera, B A K S and Disaratna, V (2023) The impact of building morphology factors on the cost and aesthetical appearance of urban detached residential buildings in Sri Lanka. Journal of Engineering, Design and Technology, 21(1), pp. 58-74. ISSN 1726-0531
Weerasinghe, A; Ramachandra, T and Rotimi, J O B (2016) A simplified model for predicting running cost of office buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Weerasinghe, A S and Ramachandra, T (2018) Economic sustainability of green buildings: A comparative analysis of green vs non-green. Built Environment Project and Asset Management, 8(5), pp. 528-543. ISSN 2044-124X
Weerasinghe, A S; Ramachandra, T and Rotimi, J O B (2022) Towards sustainable commercial buildings: An analysis of operation and maintenance (O&M) costs in Sri Lanka. Smart and Sustainable Built Environment, 11(3), pp. 454-468. ISSN 2046-6099
Weerasinghe, A S; Ramachandra, T and Thurairajah, N (2017) Life cycle cost analysis: Green vs conventional buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531
Wei, H and Xu, X (1997) Composite masonry buildings in China. Building Research & Information, 25(1), pp. 15-17. ISSN 0961-3218
Weidman, J E; Miller, K R; Christofferson, J P and Newitt, J S (2011) Best practices for dealing with price volatility in commercial construction. International Journal of Construction Education and Research, 7(4), pp. 276-293. ISSN 1557-8771
Weinert, R A (1989) A study of the agency construction management method of project delivery as a viable alternative when building new schools. DPA thesis, University of La Verne, USA.
Westberg, K; Norén, J and Kus, H (2001) On using available environmental data in service life estimations. Building Research & Information, 29(6), pp. 428-439. ISSN 0961-3218
Westgate, S E (1986) An information system for estimating, targetting and planning in small building firms. PhD thesis, Sheffield Hallam University, UK.
Westling, H (1991) Technology procurement for innovation in Swedish construction. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.
Whalen, T M; Gopal, S and Abraham, D M (2004) Cost-benefit model for the construction of tornado shelters. Journal of Construction Engineering and Management, 130(6), pp. 772-779. ISSN 0733-9364
Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.
Wheat, P E (2013) Econometric cost analysis in vertically separated railways. PhD thesis, University of Leeds, UK.
White, A (2020) Operational performance and delivery structure of hospital facilities: empirical relationship analyses in Ontario, Canada. DBA thesis, University of Manchester, UK.
White, G and Jamshidi, A (2022) Resetting dense graded airport asphalt production and construction tolerances. International Journal of Construction Management, 22(4), pp. 632-643. ISSN 1562-3599
White, J A (1964) Determination of income and financial reporting for long-term construction-type contracts. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
White, T; Ariaratnam, S T and Michael, J (2012) Subterranean infrastructure reconnaissance for manmade and natural hazards and disasters. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 66-86. ISSN 1759-5916
White III, R J (2014) Application of social impact bonds in built infrastructure sustainability projects. PhD thesis, Texas A&M University, USA.
Whitely, Owen (2025) Strategies for reducing cost overruns on government-funded infrastructure projects in Jamaica. DBA thesis, Walden University, USA.
Whittaker, J D (1970) A study of competitive bidding with particular reference to the construction industry. PhD thesis, City, University of London, UK.
Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193
Wibowo, A and Kochendoerfer, B (2011) Selecting BOT/PPP infrastructure projects for government guarantee portfolio under conditions of budget and risk in the Indonesian context. Journal of Construction Engineering and Management, 137(7), pp. 512-522. ISSN 0733-9364
Wibowo, A; Permana, A; Kochendörfer, B; Kiong, R T L; Jacob, D and Neunzehn, D (2012) Modeling contingent liabilities arising from government guarantees in Indonesian BOT/PPP toll roads. Journal of Construction Engineering and Management, 138(12), pp. 1403-1410. ISSN 0733-9364
Wibowo, A and Sundermeier, M (2020) Developing a fuzzy value-for-money analysis model for annuity-based public-private partnership infrastructure projects under consideration of risk mitigation capability. Journal of Construction Engineering and Management, 146(7): 04020081, ISSN 0733-9364
Wickramaratne, S; Wirasinghe, S C and Ruwanpura, J (2020) An update of proposed Sri Lanka warning system for East and West Coast tsunamis. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 169-186. ISSN 1759-5916
Wickramasinghe, V; Dias, P; Robert, D and Setunge, S (2024) From physical degradation condition ratings of building elements to lost value ratio bands. Built Environment Project and Asset Management, 14(6), pp. 858-873. ISSN 2044-124X
Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.
Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wijewickreme, S P (2016) A framework for providing a lifelong social security system for the operational workforce in the construction industry in Sri Lanka. PhD thesis, University of Salford, UK.
Wikstrom, M R (1993) Four papers on wage formation in a unionized economy. PhD thesis, Umea Universitet, Sweden.
Wilde, W J (1998) Life cycle cost analysis of portland cement concrete pavements. PhD thesis, University of Texas at Austin, USA.
Williams, T J (2020) Relationships between cost estimates, scheduling and project success in the construction sector. PhD thesis, Walden University, USA.
Williams, T P (1987) Knowledge-based productivity analysis of construction operations. PhD thesis, Georgia Institute of Technology, USA.
Williams, T P (1991) Hypertext data base applications in construction. Journal of Construction Engineering and Management, 117(3), pp. 460-467. ISSN 0733-9364
Williams, T P (2002) Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225-235. ISSN 01446193
Williams, T P (2007) Application of treemaps to the analysis of competitively bid project cost overruns. Construction Innovation, 7(4), pp. 340-356. ISSN 1471-4175
Wilmot, C G and Cheng, G (2003) Estimating future highway construction costs. Journal of Construction Engineering and Management, 129(3), pp. 272-279. ISSN 0733-9364
Wilmot, C G and Mei, B (2005) Neural network modeling of highway construction costs. Journal of Construction Engineering and Management, 131(7), pp. 765-771. ISSN 0733-9364
Wilson, O D and Kenley, R (1987) Estimates given and tenders received: A comparison. Construction Management and Economics, 5(3), pp. 211-226. ISSN 01446193
Wilson, O D and Sharpe, K (1988) Tenders and estimates: A probabilistic model. Construction Management and Economics, 6(3), pp. 225-245. ISSN 01446193
Winata, L E and Gultom, Y M L (2024) The effects of governance on performance: The case of public-private partnership (PPP) toll roads in Indonesia. International Journal of Construction Management, 24(13), pp. 1398-1406. ISSN 1562-3599
Winch, G and Campagnac, E (1995) The organization of building projects: An Anglo/French comparison. Construction Management and Economics, 13(1), pp. 3-14. ISSN 01446193
Windapo, A; Moghayedi, A; Oliphant, D and Adediran, A (2018) Exploring the components of cost on construction projects. Journal of Construction Business and Management, 2(2), pp. 42-50. ISSN 2521-0165
Windapo, A; Odediran, S; Moghayedi, A; Adediran, A and Oliphant, D (2017) Determinants of building construction costs in South Africa. Journal of Construction Business and Management, 1(1), pp. 8-13. ISSN 2521-0165
Wing, C K (1997) Monte Carlo simulation of construction costs using subjective data: Response. Construction Management and Economics, 15(1), pp. 109-115. ISSN 01446193
Wing, C K (1999) On the issue of plan shape complexity: Plan shape indices revisited. Construction Management and Economics, 17(4), pp. 473-482. ISSN 01446193
Wirahadikusumah, R; Abraham, D M and Castello, J (1999) Markov decision process for sewer rehabilitation. Engineering, Construction and Architectural Management, 6(4), pp. 358-370. ISSN 0969-9988
Withrow, J; Dadi, G; Nassereddine, H and Sturgill, R (2024) Asphalt material e-ticketing workflow: Qualitative and quantitative analysis. Journal of Construction Engineering and Management, 150(3): 04023164, ISSN 0733-9364
Withrow, Josh (2024) Impact of augmented documentation workflows on transportation agency asphalt paving operations: A qualitative and quantitative study. PhD thesis, University of Kentucky, USA.
Woldesenbet, A; Jeong, D H S and Oberlender, G D (2012) Daily work reports-based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), pp. 481-490. ISSN 0733-9364
Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.
Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.
Wolters, R S and Burleson, R C (1996) Merit shop recruitment and selection practices in Alabama. Journal of Construction Engineering and Management, 122(2), pp. 152-157. ISSN 0733-9364
Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.
Wong, I L; Perera, S and Eames, P C (2010) Goal directed life cycle costing as a method to evaluate the economic feasibility of office buildings with conventional and TI-façades. Construction Management and Economics, 28(7), pp. 715-735. ISSN 1466433X
Wong, J M W; Chan, A P C and Chiang, Y H (2005) Time series forecasts of the construction labour market in Hong Kong: The Box-Jenkins approach. Construction Management and Economics, 23(9), pp. 979-991. ISSN 01446193
Wong, J M W; Chan, A P C and Chiang, Y H (2008) Modeling and forecasting construction labor demand: Multivariate analysis. Journal of Construction Engineering and Management, 134(9), pp. 664-672. ISSN 0733-9364
Wong, J M W; Chan, A P C and Chiang, Y H (2010) Modeling construction occupational demand: Case of Hong Kong. Journal of Construction Engineering and Management, 136(9), pp. 991-1002. ISSN 0733-9364
Wong, J M W; Kong, H and Chiang, Y H (2004) A critical review of forecasting models to predict manpower demand. Construction Economics and Building, 4(2), pp. 43-56. ISSN 2204-9029
Wong, J M W and Ng, S T (2010) Forecasting construction tender price index inm Hong Kong using vector error correction model. Construction Management and Economics, 28(12), pp. 1255-1268. ISSN 1466433X
Wong, J T Y and Hui, E C M (2006) Construction project risks: Further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(4), pp. 425-438. ISSN 01446193
Wong, K C and Albert, T P S (1995) A fuzzy expert system for contract decision making. Construction Management and Economics, 13(2), pp. 95-103. ISSN 01446193
Wong, K C; So, A T P and Yu, N H W (2001) The financial viablity of intelligent buildings: A Faustmann approach of assessment. Journal of Financial Management of Property and Construction, 6(1), pp. 41-50. ISSN 1366-4387
Wong, K D (1993) An integrated information system for Hong Kong construction contractors. PhD thesis, Loughborough University, UK.
Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Wong, P S P; Holdsworth, S; Crameri, L and Lindsay, A (2019) Does carbon accounting have an impact on decision-making in building design? International Journal of Construction Management, 19(2), pp. 149-161. ISSN 1562-3599
Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.
Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(2), pp. 291-309. ISSN 1609-9451
Wood, G; Davis, P and Olaleye, A (2011) The effects of adding real estate into mixed-asset portfolios in South Africa. Journal of Financial Management of Property and Construction, 16(3), pp. 272-282. ISSN 1366-4387
Wood, G and Ellis, R (2001) An exploration of approaches to risk management applications within UK construction projects. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Wood, G D and Ellis, R C T (2003) Risk management practices of leading UK cost consultants. Engineering, Construction and Architectural Management, 10(4), pp. 254-262. ISSN 0969-9988
Woodhead, R M and Male, S P (2000) The conditioning effect of objective decision-making on the client's capital proposal. Engineering, Construction and Architectural Management, 7(3), pp. 300-306. ISSN 0969-9988
Wooldridge, S C (2002) Balancing capital and condition: An emerging approach to facility investment strategy. PhD thesis, Massachusetts Institute of Technology, USA.
Workineh, N; Terefe, B and Nigussie, W (2025) Nonconformity in social service space use: A case study of injibara town's plan implementation. International Journal of Construction Management, 25(14), pp. 1755-1768. ISSN 1562-3599
Wright, G B and Jack, L B (2013) Property-level stormwater drainage systems: Integrated flow simulation and whole-life costs. Building Research & Information, 41(2), pp. 223-236. ISSN 0961-3218
Wu, Z.; Liu, M.; Ma, G. and Jiang, S. (2026) A hybrid forecasting model to improve cost prediction accuracy in green building projects with machine learning. Engineering, Construction and Architectural Management, 33(4), pp. 3375-3402. ISSN 0969-9988
Wu, C; Chen, C; Jiang, R; Wu, P; Xu, B and Wang, J (2019) Understanding laborers' behavioral diversities in multinational construction projects using integrated simulation approach. Engineering, Construction and Architectural Management, 26(9), pp. 2120-2146. ISSN 0969-9988
Wu, C; Wu, P; Jiang, R; Wang, J; Wang, X and Wan, M (2022) Evaluating the economic and social benefits of multiutility tunnels with an agent-based simulation approach. Engineering, Construction and Architectural Management, 29(1), pp. 1-25. ISSN 0969-9988
Wu, H; Sun, X and Wu, Y (2022) Methods for probability distributions estimation of indoor environmental parameters and long-term IEQ assessment. Building Research & Information, 50(7), pp. 771-791. ISSN 0961-3218
Wu, J; Kumaraswamy, M and Soo, G K L (2011) Dubious benefits from future exchange: An explanation of payment arrears from 'continuing clients' in mainland China. Construction Management and Economics, 29(1), pp. 15-23. ISSN 1466433X
Wu, J; Yan, B; Sun, G; Liu, M; Li, Y and Zhou, C (2025) Research on the construction-forming model of a single-layer orthogonal saddle-shaped cable net with an opening. Journal of Construction Engineering and Management, 151(9): 05025008, ISSN 0733-9364
Wu, K and García De Soto, B (2021) Lifting sequence optimization of luffing tower cranes considering motion paths with dynamic programming. Journal of Construction Engineering and Management, 147(10): 04021126, ISSN 0733-9364
Wu, L; Mohamed, E; Jafari, P and Abourizk, S (2023) Machine learning-based Bayesian framework for interval estimate of unsafe-event prediction in construction. Journal of Construction Engineering and Management, 149(11): 04023118, ISSN 0733-9364
Wu, M L and Lo, H P (2009) Optimal strategy modeling for price-time biparameter construction bidding. Journal of Construction Engineering and Management, 135(4), pp. 298-306. ISSN 0733-9364
Wu, R (2002) Computer -aided dimensional control in building construction. PhD thesis, Eindhoven University of Technology, Netherlands.
Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364
Wyke, S; Lindhard, S M and Larsen, J K (2024) Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2415-2436. ISSN 0969-9988
Wyrick, D A and Eschenbach, T G (1989) Remote oil and gas facility construction. Journal of Construction Engineering and Management, 115(2), pp. 228-236. ISSN 0733-9364
Xia, X; Xiang, P; Khanmohammadi, S; Gao, T and Arashpour, M (2024) Predicting safety accident costs in construction projects using ensemble data-driven models. Journal of Construction Engineering and Management, 150(7): 04024054, ISSN 0733-9364
Xiang, Jianjun (2014) Extreme heat and workers' health in South Australia: Association, perceptions, and adaptations in the workplace. PhD thesis, University of Adelaide, Australia.
Xiang, P; Xia, X and Pang, X (2024) An integrated risk assessment method for cross-regional mega construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2369-2391. ISSN 0969-9988
Xiang, Z; Rashidi, A and Ou, G (2021) Automated framework to translate rebar spatial information from GPR into BIM. Journal of Construction Engineering and Management, 147(10): 04021120, ISSN 0733-9364
Xiao, L.; Fan, P.; Shen, G. Q.; Ma, G.; Jia, J. and Zheng, X. (2026) Leveraging deep reinforcement learning to facilitate the transition from knowledge diversity to knowledge creation in construction project teams. Journal of Construction Engineering and Management, 152(10): 04026175, ISSN 0733-9364
Xiao, L; Mokhtar, N A and Sulaiman, M K A M (2025) Enhancing profitability and cost efficiency in China's construction industry. Construction Economics and Building, 25(3-4), pp. 1-21. ISSN 2204-9029
Xiao, H and Proverbs, D (2002) The performance of contractors in Japan, the UK and the USA: A comparative evaluation of construction cost. Construction Management and Economics, 20(5), pp. 425-435. ISSN 01446193
Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029
Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 0969-9988
Xiao, Xue (2021) Improving the long-term use of case-based reasoning model in early construction cost estimation. PhD thesis, Queensland University of Technology, Australia.
Xie, W; Zhao, T; Tang, J and Zhang, Y (2017) Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge. Journal of Construction Engineering and Management, 143(8): 04017059, ISSN 0733-9364
Xiong, B; Newton, S; Li, V; Skitmore, M and Xia, B (2019) Hybrid approach to reducing estimating overfitting and collinearity. Engineering, Construction and Architectural Management, 26(10), pp. 2170-2185. ISSN 0969-9988
Xiong, B; Skitmore, M and Xia, B (2014) Exploring the internal dimensions of work stress: Evidence from construction cost estimators in China. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Xiong, B; Skitmore, M and Xia, B (2015) Exploring and validating the internal dimensions of occupational stress: Evidence from construction cost estimators in China. Construction Management and Economics, 33(5-6), pp. 495-507. ISSN 01446193
Xiong, Bo (2016) Improving cost estimation performance: An investigation of prediction technique and person-environment interaction. PhD thesis, Queensland University of Technology, Australia.
Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Xiong, W and Zhang, X (2014) Concession renegotiation models for projects developed through public-private partnerships. Journal of Construction Engineering and Management, 140(5): 04014008, ISSN 0733-9364
Xiong, W; Zhang, X and Chen, H (2016) Early-termination compensation in public-private partnership projects. Journal of Construction Engineering and Management, 142(4): 04015098, ISSN 0733-9364
Xiong, Y and Kuang, Y (2008) Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off. Journal of Construction Engineering and Management, 134(2), pp. 153-156. ISSN 0733-9364
Xu, J (2001) CAD-based integrated simulation environment (CAD-ise). PhD thesis, University of Alberta, Canada.
Xu, J and Smyth, H (2015) The value of trust in construction supply chains. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Xu, J; Teng, Y and Pan, W (2021) A BIM-LCA integrated method for enhancing efficiency of embodied carbon estimation of prefabricated high-rise buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364
Xu, M; Duffield, C and Ma, J (2011) Performance of mid-project reviews (MPRs): Quantification based on fuzzy recognition. Built Environment Project and Asset Management, 1(2), pp. 137-155. ISSN 2044-124X
Xu, Ming (2010) The value of critical project decisions: measurement and modelling. PhD thesis, University of Melbourne, Australia.
Xu, S; Liu, K and Tang, L C M (2015) Incorporation of expert reasoning into the BIM-based cost estimating process. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Xu, T and Tiong, R L K (2001) Risk assessment on contractors' pricing strategies. Construction Management and Economics, 19(1), pp. 77-84. ISSN 01446193
Xue, G; Liu, S; Ren, L and Gong, D (2023) Adaptive cross-scenario few-shot learning framework for structural damage detection in civil infrastructure. Journal of Construction Engineering and Management, 149(5): 04023020, ISSN 0733-9364
Yadav, H; Soni, U and Kumar, G (2023) Analysing challenges to smart waste management for a sustainable circular economy in developing countries: A fuzzy DEMATEL study. Smart and Sustainable Built Environment, 12(2), pp. 361-384. ISSN 2046-6099
Yadav, S and Ray, G S (2015) Supply chain management in flyover projects in India. Journal of Construction in Developing Countries, 20(1), pp. 25-47. ISSN 1823-6499
Yadollahi, M; Ebrahimi Saryazdi, S M; Shafaat, A and Hafezi, M (2023) Life cycle cost analysis of near zero energy buildings benefited from earth-sheltering. International Journal of Construction Management, 23(15), pp. 2670-2682. ISSN 1562-3599
Yahya, K and Boussabaine, H (2010) Quantifying environmental impacts and eco-costs from brick waste. Architectural Engineering and Design Management, 6(3), pp. 189-206. ISSN 1745-2007
Yakubu, O A and Sun, M (2009) A survey of construction project cost and time control practices in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708
Yan, S (1992) Intermodal pricing and operations using network flow techniques. PhD thesis, Massachusetts Institute of Technology, USA.
Yang, W and Lam, P T I (2026) A framework for foundational and transitional value assessment of non-market benefits of a smart government system. Building Research & Information, 54(2), pp. 237-256. ISSN 0961-3218
Yang, F and Yang, M (2015) Efficiency of public goods provision in wenchuan earthquake-stricken rural areas, Sichuan, China a fuzzy comprehensive evaluation. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 193-205. ISSN 1759-5916
Yang, I T (2006) Using Gaussian copula to simulate repetitive projects. Construction Management and Economics, 24(9), pp. 901-909. ISSN 1466433X
Yang, I T (2007) Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis. Journal of Construction Engineering and Management, 133(7), pp. 498-505. ISSN 0733-9364
Yang, I T (2008) Distribution-free Monte Carlo simulation: Premise and refinement. Journal of Construction Engineering and Management, 134(5), pp. 352-360. ISSN 0733-9364
Yang, N (2010) Optimization of highway work zone decisions considering short-term and long-term impacts. PhD thesis, University of Maryland, College Park, USA.
Yang, W and Kohler, N (2008) Simulation of the evolution of the Chinese building and infrastructure stock. Building Research & Information, 36(1), pp. 1-19. ISSN 0961-3218
Yap, J B H; Abdul-Rahman, H and Wang, C (2018) Preventive mitigation of overruns with project communication management and continuous learning: PLS-SEM approach. Journal of Construction Engineering and Management, 144(5): 4018025, ISSN 0733-9364
Yap, J B H and Cheah, S Y (2020) Key challenges faced by Chinese contractors in Malaysian construction industry: Empirical study. Journal of Engineering, Design and Technology, 18(3), pp. 705-726. ISSN 1726-0531
Yap, J B H and Chow, I N (2020) Investigating the managerial "nuts and bolts" for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 331-348. ISSN 2044-124X
Yap, J B H; Leong, W J and Skitmore, M (2020) Capitalising teamwork for enhancing project delivery and management in construction: Empirical study in Malaysia. Engineering, Construction and Architectural Management, 27(7), pp. 1479-1503. ISSN 0969-9988
Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531
Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499
Yap, J B H and Lock, A (2017) Analysing the benefits, techniques, tools and challenges of knowledge management practices in the Malaysian construction SMEs. Journal of Engineering, Design and Technology, 15(6), pp. 803-825.
Yap, J B H; Low, P L and Wang, C (2017) Rework in Malaysian building construction: Impacts, causes and potential solutions. Journal of Engineering, Design and Technology, 15(5), pp. 591-618.
Yap, J B H and Shavarebi, K (2022) Enhancing project delivery performances in construction through experiential learning and personal constructs: Competency development. International Journal of Construction Management, 22(3), pp. 436-452. ISSN 1562-3599
Yap, J B H and Skitmore, M (2018) Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), pp. 218-238. ISSN 1745-2007
Yari, N (2018) New model for bridge management system (bms): Bridge repair priority ranking system (brprs), case based reasoning for bridge deterioration, cost optimization, and preservation strategy. PhD thesis, University of New Hampshire, USA.
Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Yazdi, Alireza Jalali (2022) Developing an integrated design support framework to enable mass-customisation in multi-storey timber building projects. PhD thesis, University of Technology Sydney, Australia.
Ye, K; Jiang, W and Shen, L (2008) Project competition intensity (PCI) in the construction market: A case study in China. Construction Management and Economics, 26(5), pp. 463-470. ISSN 01446193
Ye, K M (2013) A conceptual model to improve building commissioning in construction projects: Case studies of a public institution of higher learning in Malaysia. PhD thesis, University of Malaya, Malaysia.
Ye, Xuling (2025) Blockchain-based smart contract realization in BIM environment: Technical adoption for reliable and collaborative construction management. PhD thesis, Ruhr-Universität Bochum, Germany.
Ye, Z; Kapogiannis, G; Tang, S; Zhang, Z; Jimenez-Bescos, C and Yang, T (2025) Influence of an integrated value-based asset condition assessment in built asset management. Construction Innovation, 25(2), pp. 248-269. ISSN 1471-4175
Yean, F; Ling, Y and Ang, W T (2013) Using control systems to improve construction project outcomes. Engineering, Construction and Architectural Management, 20(6), pp. 576-588. ISSN 0969-9988
Yeh, H H H (2011) Adjustment behaviour of capital structure over the business cycles: Evidence from the construction industry of Taiwan. Construction Management and Economics, 29(4), pp. 329-340. ISSN 1466433X
Yeh, I C (1998) Quantity estimating of building with logarithm-neuron networks. Journal of Construction Engineering and Management, 124(5), pp. 374-380. ISSN 0733-9364
Yeh, Y C; Hsu, D S and Kuo, Y H (1991) Expert system for diagnosing damage of prestressed concrete pile. Journal of Construction Engineering and Management, 117(1), pp. 13-26. ISSN 0733-9364
Yemoh, O O; Opoku, R; Takyi, G; Adomako, E K; Uba, F and Obeng, G (2025) Green building adaptation in hot-humid climates: Assessment of coconut and corn husk fiber composite bricks as energy-efficient building envelopes. International Journal of Building Pathology and Adaptation, 43(6), pp. 1522-1540. ISSN 2398-4708
Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects. PhD thesis, University of Manchester, UK.
Yeung, D and Skitmore, M (2012) A method for systematically pooling data in very early stage construction price forecasting. Construction Management and Economics, 30(11), pp. 929-939. ISSN 1466433X
Yeung, D K L and Skitmore, M (2005) Data pooling for early-stage price forecasts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Yevu, S K; Owusu, E K; Chan, A P C; Oti-Sarpong, K; Wuni, I Y and Tetteh, M O (2023) Systematic review on the integration of building information modelling and prefabrication construction for low-carbon building delivery. Building Research & Information, 51(3), pp. 279-300. ISSN 0961-3218
Yi, J; Chen, H and Li, S (2010) Determination of contract time and incentive and disincentive values of highway construction projects. International Journal of Construction Education and Research, 6(4), pp. 285-302. ISSN 1557-8771
Yi, K J and Langford, D (2006) Scheduling-based risk estimation and safety planning for construction projects. Journal of Construction Engineering and Management, 132(6), pp. 626-635. ISSN 0733-9364
Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599
Yip, H L; Wong, S Y; Ding, C S and Low, W W (2026) Ethical transgressions in the construction industry in sarawak, Malaysia: Perspectives of quantity surveyors. Engineering, Construction and Architectural Management, 33(1), pp. 435-451. ISSN 0969-9988
Yiu, C Y; Ho, H K; Lo, S M and Hu, B Q (2005) Performance evaluation for cost estimators by reliability interval method. Journal of Construction Engineering and Management, 131(1), pp. 108-116. ISSN 0733-9364
Yohanis, Y G and Norton, B (1998) Estimating at the earliest stages of design the financial cost and operational energy requirement of buildings. Journal of Financial Management of Property and Construction, 3(2), pp. 41-58. ISSN 1366-4387
Yokouchi, N; Ambe, T; Fujisaki-Sueda-Sakai, M and Ozawa, K (2024) Workplace bullying and harassment in the Japanese construction industry: prevalence and associations with subjective health and work attractiveness. Construction Management and Economics, 42(8), pp. 741-757. ISSN 01446193
Yoo, J.; Hwang, S.; Seo, J. and Choi, B. (2026) Feasibility of a wearable 360° camera for personalized proximity warning on construction sites. Journal of Construction Engineering and Management, 152(6): 04026079, ISSN 0733-9364
Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.
Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.
Yoo, Y J (2014) The development of green building performance assessment tool (GBPAT). PhD thesis, University of Wisconsin - Madison, USA.
Yoon, Jong Han (2023) Blockchain-enabled smart contract system for creating system-based trust in subcontracting process. PhD thesis, Georgia Institute of Technology, USA.
Yoon, S; Kim, Y; Park, M and Ahn, C R (2023) Effects of spatial characteristics on the human-robot communication using deictic gesture in construction. Journal of Construction Engineering and Management, 149(7): 04023049, ISSN 0733-9364
Yoon, Y and Gangarao, H (2021) Prioritization framework for rockfall countermeasures for rock-cut slopes for rural roads. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364
Yoon, Y; Patel, S; Ji, R and Hastak, M (2017) Current state of reflective cracking in the United States. Journal of Construction Engineering and Management, 143(3): 04016099, ISSN 0733-9364
Yoon, Y J (2012) Planning of optimal rehabilitation strategies for infrastructure using time float and multiyear prioritization approach. PhD thesis, Purdue University, USA.
You, X (2010) Risk analysis in tunneling with imprecise probabilities. PhD thesis, University of Texas at Austin, USA.
Yousefi, Elham (2023) Developing a data-driven design framework for mass customisation of multi-storey residential buildings. PhD thesis, University of Technology Sydney, Australia.
Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364
Youssefi, I and Celik, T (2024) Comparative analysis between different risk score calculation approaches. Engineering, Construction and Architectural Management, 31(10), pp. 4099-4124. ISSN 0969-9988
Yu, H; Deng, X; Zhang, N and Zhang, X (2026) Is blockchain cost-effective in construction project management? A systematic review from the perspective of transaction cost. Engineering, Construction and Architectural Management, 33(1), pp. 28-52. ISSN 0969-9988
Yu, B (2007) Essays on structural analysis of procurement auctions. PhD thesis, Ohio State University, USA.
Yu, B (2013) Environmental implications of pavements: A life cycle view. PhD thesis, University of South Florida, USA.
Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity. PhD thesis, University College London, UK.
Yu, W D (2006) PIREM: A new model for conceptual cost estimation. Construction Management and Economics, 24(3), pp. 259-270. ISSN 01446193
Yu, W D and Lo, S S (2005) Time-dependent construction social costs model. Construction Management and Economics, 23(3), pp. 327-337. ISSN 01446193
Yu, X and Ergan, S (2021) Key variables in determining energy shaving capacity of buildings during demand response events. Journal of Construction Engineering and Management, 147(1): 04020146, ISSN 0733-9364
Yu, Y (2021) Road network maintenance and repair considering day-to-day traffic dynamics and transient congestion. PhD thesis, Imperial College London, UK.
Yu, Y; Yang, X; Li, H; Luo, X; Guo, H and Fang, Q (2019) Joint-level vision-based ergonomic assessment tool for construction workers. Journal of Construction Engineering and Management, 145(5): 04019025, ISSN 0733-9364
Yuan, F; Tang, M and Hong, J (2020) Efficiency estimation and reduction potential of the Chinese construction industry via SE-DEA and artificial neural network. Engineering, Construction and Architectural Management, 27(7), pp. 1533-1552. ISSN 0969-9988
Yuan, J; Zeng, A Y; Skibniewski, M J and Li, Q (2009) Selection of performance objectives and key performance indicators in public-private partnership projects to achieve value for money. Construction Management and Economics, 27(3), pp. 253-270. ISSN 1466433X
Yuan, X X (2011) A correlated bidding model for markup size decisions. Construction Management and Economics, 29(11), pp. 1101-1119. ISSN 1466433X
Yuan, X X (2012) Bayesian method for the correlated competitive bidding model. Construction Management and Economics, 30(6), pp. 477-491. ISSN 1466433X
Yuan, Z; Wang, H; Yang, Y; Chao, Y; Huang, D and Yu, D (2024) Improving the construction accuracy of precast components in prefabricated buildings by analyzing relevant factors from the perspective of supply chain: A system dynamics model. Architectural Engineering and Design Management, 20(2), pp. 230-248. ISSN 1745-2007
Yumul, John (2025) Evaluation of machine learning models to predict cost overruns for New York city capital projects. DEngr thesis, George Washington University, USA.
Yung, P and Agyekum-Mensah, G (2012) Productivity losses in smoking breaks on construction sites: A case study. Engineering, Construction and Architectural Management, 19(6), pp. 636-646. ISSN 0969-9988
Yunpeng, G and Zaman, U (2024) Exploring mega-construction project success in China's vaunted belt and road initiative: The role of paternalistic leadership, team members' voice and team resilience. Engineering, Construction and Architectural Management, 31(9), pp. 3801-3825. ISSN 0969-9988
Yusof, I H M; An, M and Barghi, M H (2015) Integration of lean construction considerations into design process of construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Zaalouk, A; Altaf, M S and Han, S (2025) Operations-oriented supply chain master planning in panelized construction using hybrid multiagent simulation. Journal of Construction Engineering and Management, 151(10): 04025206, ISSN 0733-9364
Zafaranchi, M and Sözer, H (2024) Comparing energy profiles of different building types by determining their sensitivities. Architectural Engineering and Design Management, 20(6), pp. 1489-1510. ISSN 1745-2007
Zahed, S E; Shahooei, S; Farooghi, F; Shahandashti, M and Ardekani, S (2019) Life-cycle cost analysis of a short-haul underground freight transportation system for the DFW airport. Built Environment Project and Asset Management, 9(3), pp. 440-456. ISSN 2044-124X
Zaher, M; Greenwood, D and Marzouk, M (2018) Mobile augmented reality applications for construction projects. Construction Innovation, 18(2), pp. 152-166. ISSN 1471-4175
Zahoor, H; Chan, A P C; Utama, W P; Gao, R and Memon, S A (2017) Determinants of safety climate for building projects: SEM-based cross-validation study. Journal of Construction Engineering and Management, 143(6): 05017005, ISSN 0733-9364
Zahoor, H; Khan, R M; Nawaz, A; Ayaz, M and Maqsoom, A (2022) Project control and forecast assessment of building projects in Pakistan using earned value management. Engineering, Construction and Architectural Management, 29(2), pp. 842-869. ISSN 0969-9988
Zakeri Afshar, A; Abbasianjahromi, H; Mirhosseini, S M and Ehsanifar, M (2025) Determining the range of negotiable prices for public–private partnership infrastructure projects: A simulation approach. International Journal of Building Pathology and Adaptation, 43(1), pp. 50-74. ISSN 2398-4708
Zaman, U; Florez-Perez, L; Anjam, M; Ghani Khwaja, M and Ul-Huda, N (2023) At the end of the world, turn left: Examining toxic leadership, team silence and success in mega construction projects. Engineering, Construction and Architectural Management, 30(6), pp. 2436-2462. ISSN 0969-9988
Zaneldin, E (2005) Construction claims in the united arab emirates: Types, causes, and frequency. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Zangeneh, P (2021) Knowledge representation and artificial intelligence for management of socio-technical risks in megaprojects. PhD thesis, University of Toronto, Canada.
Zani, C M; Brandalise, F M P; Pedó, B; Formoso, C T; Tommelein, I D; Ortiz-Marcos, I; Viana, D D; Bataglin, F S and Koskela, L (2025) Devising a taxonomy for visual management requirements by considering different purposes and contexts. Construction Management and Economics, 43(7), pp. 518-536. ISSN 0144-6193
Zapata Quimbayo, C A and Mejía Vega, C A (2023) Credit risk in infrastructure PPP projects under the real options approach. Construction Management and Economics, 41(4), pp. 293-306. ISSN 01446193
Zayed, T and Liu, Y (2014) Cash flow modeling for construction projects. Engineering, Construction and Architectural Management, 21(2), pp. 170-189. ISSN 0969-9988
Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988
Zayed, T M (2001) Assessment of productivity for concrete bored pile construction. PhD thesis, Purdue University, USA.
Zayed, T M and Halpin, D W (2004) Process versus data oriented techniques in pile construction productivity assessment. Journal of Construction Engineering and Management, 130(4), pp. 490-499. ISSN 0733-9364
Zayed, T M and Halpin, D W (2004) Quantitative assessment for piles productivity factors. Journal of Construction Engineering and Management, 130(3), pp. 405-414. ISSN 0733-9364
Zayed, T M and Halpin, D W (2004) Simulation as a tool for pile productivity assessment. Journal of Construction Engineering and Management, 130(3), pp. 394-404. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Pile construction productivity assessment. Journal of Construction Engineering and Management, 131(6), pp. 705-714. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364
Zayed, T M; Halpin, D W and Basha, I M (2005) Productivity and delays assessment for concrete batch plant-truck mixer operations. Construction Management and Economics, 23(8), pp. 839-850. ISSN 01446193
Zea Escamilla, E (2015) Development of simplified life cycle assessment methodology for construction materials and buildings outside of the European context through the use of geographic information systems. DSc thesis, ETH Zürich, Switzerland.
Zeng, N; Liu, Y; Wang, C; Chen, Q; Liu, Y and Li, Q (2026) On- and off-site coordination in a modular construction supply chain: Domain-spanning production flow framing and evaluation. Journal of Construction Engineering and Management, 152(2): 04025245, ISSN 0733-9364
Zeng, C (2014) Automated building information extraction and evaluation from high-resolution remotely sensed data. PhD thesis, University of Western Ontario, Canada.
Zeng, C S (2025) Decision under intensity-based costs in large-scale systems. PhD thesis, Princeton University, USA.
Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X
Zhan, W and Pan, W (2020) Formulating systemic construction productivity enhancement strategies. Journal of Construction Engineering and Management, 146(8): 05020008, ISSN 0733-9364
Zhang, J and Jiang, S (2026) Review of artificial intelligence applications in construction management over the last five years. Engineering, Construction and Architectural Management, 33(1), pp. 361-379. ISSN 0969-9988
Zhang, L.; Zhou, J. and Xue, H. (2026) Exploring the configurational effects of contractual and relational governance mechanisms on stakeholder collaboration in prefabricated building projects. Engineering, Construction and Architectural Management, 33(4), pp. 3220-3239. ISSN 0969-9988
Zhang, P; Sing, M C P; Chan, A P C and Liu, H J (2026) Utilizing deep learning for the extraction of cost risk factors from project risk registers: Enhancing contingency estimation. Journal of Construction Engineering and Management, 152(5): 04026049, ISSN 0733-9364
Zhang, X.; Huang, J. and Wang, D. (2026) A quantitative method for indoor trajectory analysis of older adults for spatial evaluation and optimization. Building Research & Information, 54(6), pp. 753-774. ISSN 0961-3218
Zhang, Z.; Wang, Y.; Liu, J.; Wang, Y.; Liu, C. and Geng, X. (2026) Transport risk assessment for China's prefabricated construction supply chain: Integrating game theory and fuzzy Bayesian network. Engineering, Construction and Architectural Management, pp. 1-24. ISSN 0969-9988
Zhang, C; Chen, K; Yang, J; Fu, J; Wang, S and Xie, Y (2022) Reuse of discharged soil from slurry shield tunnel construction as synchronous grouting material. Journal of Construction Engineering and Management, 148(2): 04021193, ISSN 0733-9364
Zhang, H; Li, H and Tam, C M (2004) Fuzzy discrete-event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management, 11(6), pp. 426-437. ISSN 0969-9988
Zhang, J; Chen, F and Yuan, X X (2020) Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: A Canadian study. Construction Management and Economics, 38(8), pp. 739-755. ISSN 01446193
Zhang, J and El-Diraby, T E (2006) Constructability analysis of the bridge superstructure rotation construction method in China. Journal of Construction Engineering and Management, 132(4), pp. 353-362. ISSN 0733-9364
Zhang, L and Agapiou, A (2020) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(4), pp. 145-162. ISSN 17514304
Zhang, L; Dai, G; Zou, X and Qi, J (2020) Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Engineering, Construction and Architectural Management, 27(10), pp. 3095-3113. ISSN 0969-9988
Zhang, N and Tiong, R (2003) Integrated electronic commerce model for the construction industry. Journal of Construction Engineering and Management, 129(5), pp. 578-585. ISSN 0733-9364
Zhang, P (2018) Mapping buried utilities in difficult environments. PhD thesis, University of Nottingham, UK.
Zhang, Peng (2015) Comparative research between the Chinese and the Australian construction industries based on productivity and industrial competitiveness. PhD thesis, RMIT University, Australia.
Zhang, R; Xing, J; Ye, K; Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(3), pp. 367-385. ISSN 0969-9988
Zhang, S; Bogus, S M; Lippitt, C D and Migliaccio, G C (2017) Estimating location-adjustment factors for conceptual cost estimating based on nighttime light satellite imagery. Journal of Construction Engineering and Management, 143(1): 04016087, ISSN 0733-9364
Zhang, S; Hua, X and Shi, X (2024) Measurement for risk perception ability. Journal of Construction Engineering and Management, 150(5): 04024036, ISSN 0733-9364
Zhang, S; Migliaccio, G C; Zandbergen, P A and Guindani, M (2014) Empirical assessment of geographically based surface interpolation methods for adjusting construction cost estimates by project location. Journal of Construction Engineering and Management, 140(6): 4014015, ISSN 0733-9364
Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364
Zhang, Xuan (2025) Coordination and optimization of prefabricated building supply chain for sustainability development. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Zhang, Y; Minchin, R E and Agdas, D (2017) Forecasting completed cost of highway construction projects using LASSO regularized regression. Journal of Construction Engineering and Management, 143(10): 04017071, ISSN 0733-9364
Zhang, Y; Minchin, R E; Flood, I and Ries, R J (2023) Preliminary cost estimation of highway projects using statistical learning methods. Journal of Construction Engineering and Management, 149(5): 04023026, ISSN 0733-9364
Zhang, Y; Peng, Z; Lu, W and Webster, C (2025) Profit-sensitive generative design for high-rise building morphologies: Innovations in 3D form generation and cost-revenue assessment. Building Research & Information, 53(4), pp. 435-457. ISSN 0961-3218
Zhang, Y; Wang, J; Ahmad, R and Li, X (2022) Integrating lean production strategies, virtual reality technique and building information modeling method for mass customization in cabinet manufacturing. Engineering, Construction and Architectural Management, 29(10), pp. 3970-3996. ISSN 0969-9988
Zhao, J. and Xu, Z. (2026) A generalizable deep reinforcement learning-based algorithm for priority rule scheduling in stochastic resource-constrained project scheduling. Journal of Construction Engineering and Management, 152(9): 04026156, ISSN 0733-9364
Zhao, J; Cao, Y and Xiang, Y (2024) Pose estimation method for construction machine based on improved alphapose model. Engineering, Construction and Architectural Management, 31(3), pp. 976-996. ISSN 0969-9988
Zhao, L and Freiheit, T (2017) Estimating good design attributes from generalized drivers to provide early assistance to design requirements analysis. Journal of Engineering, Design and Technology, 15(3), pp. 317-340.
Zhao, X; Wu, P and Wang, X (2018) Risk paths in BIM adoption: Empirical study of China. Engineering, Construction and Architectural Management, 25(9), pp. 1170-1187. ISSN 0969-9988
Zhao, Z Y; Lv, Q L; Zuo, J and Zillante, G (2010) Prediction system for change management in construction project. Journal of Construction Engineering and Management, 136(6), pp. 659-669. ISSN 0733-9364
Zhao, Z Y; Tang, C; Zhang, X and Skitmore, M (2017) Agglomeration and competitive position of contractors in the international construction sector. Journal of Construction Engineering and Management, 143(6): 04017004, ISSN 0733-9364
Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2004) Applying a genetic algorithm-based multiobjective approach for time-cost optimization. Journal of Construction Engineering and Management, 130(2), pp. 168-176. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(1), pp. 81-91. ISSN 0733-9364
Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364
Zheng, X; Hu, X; Wu, C; Li, Y and Yang, D (2025) Revisiting the relationships between governance mechanisms and project performance: Meta-analysis of main and moderating effects. Journal of Construction Engineering and Management, 151(11): 04025164, ISSN 0733-9364
Zhi, M; Hua, G B; Wang, S Q and Ofori, G (2003) Total factor productivity growth accounting in the construction industry of Singapore. Construction Management and Economics, 21(7), pp. 707-718. ISSN 01446193
Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.
Zhong, Yunshun (2025) Leveraging large language models for intelligent construction management systems. PhD thesis, University of Toronto, Canada.
Zhou, B (2012) Optimal decision-making of interdependent transportation investment alternatives under risk and uncertainty. PhD thesis, Illinois Institute of Technology, USA.
Zhou, G (2021) Machine learning-based cost predictive model for better operating expenditure estimations of U.S. light rail transit projects. EngD thesis, George Washington University, USA.
Zhou, H and Rezazadeh Azar, E (2019) BIM-based energy consumption assessment of the on-site construction of building structural systems. Built Environment Project and Asset Management, 9(1), pp. 2-14. ISSN 2044-124X
Zhou, H; Chan, A P C; Yang, Y and Yi, W (2025) A systematic review of mental states and safety performance of construction workers. Journal of Construction Engineering and Management, 151(10): 03125007, ISSN 0733-9364
Zhou, J; Tam, V W Y; Qin, Y and Illankoon, C (2024) A critical review and comparative analysis of cost management on prefabricated construction research (2000–2022). International Journal of Construction Management, 24(9), pp. 997-1006. ISSN 1562-3599
Zhou, T (2023) Embodied robot teleoperation in construction. PhD thesis, University of Florida, USA.
Zhou, W (2023) Condition state-based decision making in evolving systems: Applications in asset management and delivery. PhD thesis, George Mason University, USA.
Zhou, W; Heesom, D; Georgakis, P and Tah, J H M (2014) User-centred design for collaborative 4D modelling. Construction Innovation, 14(4), pp. 493-517. ISSN 1471-4175
Zhou, X (2011) Managing commodity risks in highway contracts: Quantifying premiums, accounting for correlations among risk factors, and designing optimal price-adjustment contracts. PhD thesis, Texas A&M University, USA.
Zhou, Y; Wang, Y; Li, C; Ding, L and Wang, C (2024) Automatic generative design and optimization of hospital building layouts in consideration of public health emergency. Engineering, Construction and Architectural Management, 31(4), pp. 1391-1407. ISSN 0969-9988
Zhou, Yifan (2010) Asset life prediction and maintenance decision-making using a non-linear non-Gaussian state space model. PhD thesis, Queensland University of Technology, Australia.
Zhou, Z; Li, Q and Wu, W (2012) Developing a versatile subway construction incident database for safety management. Journal of Construction Engineering and Management, 138(10), pp. 1169-1180. ISSN 0733-9364
Zhu, F; Hu, H; Xu, F and Tang, N (2021) Predicting the impact of country-related risks on cost overrun for overseas infrastructure projects. Journal of Construction Engineering and Management, 147(2): 0012933, ISSN 0733-9364
Zhu, H; Hwang, B G; Ngo, J and Tan, J P S (2022) Applications of smart technologies in construction project management. Journal of Construction Engineering and Management, 148(4): 04022010, ISSN 0733-9364
Zhu, L; Wei, X and Liang, R (2024) Navigating uncertainty: Optimizing contractor selection for megaprojects in group decision-making with multiple criteria. Journal of Construction Engineering and Management, 150(11): 04024157, ISSN 0733-9364
Zhu, W; Li, J; Shen, K and Li, X (2025) Carbon dioxide emission reduction assessments of recycled aggregate concrete applications for infrastructure by incorporating vegetation carbon sink. Journal of Construction Engineering and Management, 151(9): 04025132, ISSN 0733-9364
Zhu, Y; Ahmad, I and Wang, L (2009) Estimating work zone road user cost for alternative contracting methods in highway construction projects. Journal of Construction Engineering and Management, 135(7), pp. 601-608. ISSN 0733-9364
Zhu, Y and Issa, R (2017) Computer simulation for construction education using the structure-behavior-function theory: A pilot study on learning estimating concepts. International Journal of Construction Education and Research, 13(2), pp. 142-60. ISSN 1557-8771
Zhuravchak, R; Nord, N and Brattebø, H (2022) The effect of building attributes on the energy performance at a scale: An inferential analysis. Building Research & Information, 50(6), pp. 662-680. ISSN 0961-3218
Zimina, D; Ballard, G and Pasquire, C (2012) Target value design: Using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(5), pp. 383-398. ISSN 1466433X
Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(6), pp. 1129-1150. ISSN 0969-9988
Zou, Y and Lee, S H (2008) The impacts of change management practices on project change cost performance. Construction Management and Economics, 26(4), pp. 387-393. ISSN 1466433X
Zuluaga, C M; Albert, A and Winkel, M A (2020) Improving safety, efficiency, and productivity: Evaluation of fall protection systems for bridge work using wearable technology and utility analysis. Journal of Construction Engineering and Management, 146(2): 04019107, ISSN 0733-9364
Zuniga-Garcia, N; Machemehl, R B; Khwaja, N A; Pruner, K D and Fu, M (2021) Estimation of road user costs for work zones in data-limited or time-constrained environments. Journal of Construction Engineering and Management, 147(3): 04020182, ISSN 0733-9364
Zwick, D C and Miller, K R (2004) Project buyout. Journal of Construction Engineering and Management, 130(2), pp. 245-248. ISSN 0733-9364
al Abo Omar, E and Mangin, J (2002) A new cost control model and indicators to measure productivity on building sites. Construction Innovation, 2(2), pp. 83-101. ISSN 1471-4175
al-Attar, H; Sweis, G; Tarawneh, B; Abu-Khader, W; Haddad, L and Sweis, R (2025) Enhanced construction project duration estimation using artificial neural networks: Initial design and planning stages. Construction Economics and Building, 25(2), pp. 168-191. ISSN 2204-9029
d'Apolito, L and Hong, H (2020) Forklift truck performance simulation and fuel consumption estimation. Journal of Engineering, Design and Technology, 18(3), pp. 689-703. ISSN 1726-0531
de Leeuw, C P (1988) The pre-estimation of compensation payable in accordance with the contract price adjustment provisions of the building industry advisory council. DSc thesis, University of Pretoria, South Africa.
de Leon, D E (1996) Integrating socioeconomics in the development of criteria for optimal aseismic design of r/c buildings. PhD thesis, University of California, Irvine, USA.
de Magalhães, F M R L (2010) Operational modal analysis for testing and monitoring of bridges and special structures. PhD thesis, Universidade do Porto, Portugal.
de Melo, R S S; Do, D; Tillmann, P; Ballard, G and Granja, A D (2016) Target value design in the public sector: Evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp. 125-137. ISSN 1745-2007
de Oliveira, R (1994) A methodology for housing design. PhD thesis, University of Waterloo, Canada.
de Valence, Gerard (2001) Construction deflators and measurement of output. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
ke, Y; Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(1), pp. 6-25. ISSN 1366-4387
olde Scholtenhuis, Léon Luc (2015) Enhancing mindful coordination in fragmented utility construction practices: By developing, implementing and evaluating virtual design and construction models. PhD thesis, University of Twente, Netherlands.
van Gelder, P H A J M (2000) Statistical methods for the risk -based design of civil structures. PhD thesis, Delft University of Technology, Netherlands.
van den Boomen, M; Spaan, M T J; Schoenmaker, R and Wolfert, A R M (2019) Untangling decision tree and real options analyses: A public infrastructure case study dealing with political decisions, structural integrity and price uncertainty. Construction Management and Economics, 37(1), pp. 24-43. ISSN 01446193
van der Bent, H S (2022) Towards a future sustainable housing stock: Assessment of the energy performance of dwellings of non-profit housing associations. PhD thesis, Delft University of Technology, Netherlands.
van der Kuyp, D J (2018) Strategies construction managerial leaders use to counteract material cost overruns. PhD thesis, Walden University, USA.
zhao, X. and lu, R. (2025) Dynamic scheduling optimization model and algorithm for linear projects considering local rescheduling. Engineering, Construction and Architectural Management, 33(5), pp. 4019-4045. ISSN 0969-9988
Ökmen, O and Öztas, A (2010) Construction cost analysis under uncertainty with correlated cost risk analysis model. Construction Management and Economics, 28(2), pp. 203-212. ISSN 1466433X
Ökmen, Ö and Öztaş, A (2008) Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), pp. 49-63. ISSN 0733-9364
Ökmen, Ö and Öztaş, A (2015) Scenario based evaluation of a cost risk model through sensitivity analysis. Engineering, Construction and Architectural Management, 22(4), pp. 403-423. ISSN 0969-9988
Ünsal Altuncan, I and Tanyer, A M (2018) Context-dependent construction conflict management performance analysis based on competency theory. Journal of Construction Engineering and Management, 144(12): 04018112, ISSN 0733-9364
Ürge-Vorsatz, D; Harvey, L D D; Mirasgedis, S and Levine, M D (2007) Mitigating CO2 emissions from energy use in the world's buildings. Building Research & Information, 35(4), pp. 379-398. ISSN 0961-3218
Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.
Up a level