Items with Subject: evaluation
Abdel Aziz, A M (2007) Successful delivery of public-private partnerships for infrastructure development. Journal of Construction Engineering and Management, 133(12), pp. 918-931. ISSN 0733-9364
Abdirad, H (2017) Metric-based BIM implementation assessment: A review of research and practice. Architectural Engineering and Design Management, 13(1), pp. 52-78. ISSN 1745-2007
Abduh, M; Sukardi, S N; Wirahadikusumah, R D; Oktaviani, C Z and Bahagia, S N (2023) Maturity of procurement units for public construction projects in Indonesia. International Journal of Construction Management, 23(13), pp. 2171-2184. ISSN 1562-3599
Abiodun, O; Abadi, M; Ejohwomu, O and Manu, P (2024) Dimensions of maturity model for institutionalising smart circular construction: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Aboushiwa, M A A (2000) Promoter briefing on the procurement and selection of contract strategy offering the best value for money. PhD thesis, University of Manchester, UK.
Adams, J D and Brown, A W (2002) Project management in public sector construction projects: Assessing value for money. Journal of Construction Procurement, 8(2), pp. 84-100. ISSN 1358-9180
Addis, B and Al-Ghamdi, M (1998) The role of technical marketing in effective utilization of quality management in consulting engineering firms. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Adeniyi, O (2017) Capability maturity model for assessing flood resilience capabilities of the built environment. PhD thesis, University of Northumbria, UK.
Adighibe, Charles Nnason (2015) Public private partnership infrastructure delivery: Benefits and costs for society. PhD thesis, Queensland University of Technology, Australia.
Adukpo, S E and Leiringer, R (2016) Client project governance capabilities: Unpacking the concept and governance mechanisms in practice. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Agbaxode, P D K (2022) A framework to improve design documentation quality using integrated project delivery (IPD) approach. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Agbesi, K; Kissi, E and Adjei-Kumi, T (2020) Implementation of sustainable procurement practices in public sector construction organisation in Ghana. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Aghimien, D O; Oke, A E and Aigbavboa, C O (2018) Barriers to the adoption of value management in developing countries. Engineering, Construction and Architectural Management, 25(7), pp. 818-834. ISSN 0969-9988
Akinradewo, O I; Aigbavboa, C O; Edwards, D J and Oke, A E (2022) A principal component analysis of barriers to the implementation of blockchain technology in the South African built environment. Journal of Engineering, Design and Technology, 20(4), pp. 914-934. ISSN 1726-0531
Akintoye, A; Hardcastle, C; Beck, M; Chinyio, E and Asenova, D (2003) Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5), pp. 461-470. ISSN 01446193
Akintoye, A; Taylor, C and Fitzgerald, E (1998) Risk analysis and management of private finance initiative projects. Engineering, Construction and Architectural Management, 5(1), pp. 9-21. ISSN 0969-9988
Akomea-Frimpong, I; Jin, X and Osei-Kyei, R (2021) Developing a financial risk maturity model for public-private partnership projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Al Ahbabi, M and Alshawi, M (2015) BIM for client organisations: A continuous improvement approach. Construction Innovation, 15(4), pp. 402-408. ISSN 1471-4175
Al-Balushi, R A; Fortune, C and Kaka, A (2005) The implementation of corporate strategies through the use of an enterprise project management model (epmm): The case of telecommunication operator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Al-Balushi, R A; Kaka, A and Fortune, C (2004) Project management processes and the achievement of organizational strategies: The case of telecomm. Operator. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Al-Hinai, A (2024) A hermeneutical approach to social value: A case study of national infrastructure planning in Oman. PhD thesis, University of Manchester, UK.
Al-Zubi, M (2011) The impact of organizational culture on knowledge sharing in the construction sector in Jordan. PhD thesis, University of Salford, UK.
Alajmi, A M R F (2009) The delivery of value for money in public sector projects in Qatar. PhD thesis, University of Leeds, UK.
Alankarage, S; Chileshe, N; Samaraweera, A; Rameezdeen, R and Edwards, D J (2022) Organisational culture in building information modelling maturity research: A bibliometric analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Alankarage, S; Chileshe, N; Samaraweera, A; Rameezdeen, R and Edwards, D J (2023) Organisational BIM maturity models and their applications: A systematic literature review. Architectural Engineering and Design Management, 19(6), pp. 567-585. ISSN 1745-2007
Alaqad, M; Gidado, K and Piroozfar, P (2015) Integrating value, risk and environmental management at the strategic definition stage. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Alattyih, W H (2015) Value creation and risk assessment for green building design in Saudi Arabia. PhD thesis, University of Liverpool, UK.
Alazemi, T (2011) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.
Alazemi, Talal Lafi (2012) On the integration of value engineering in the procurement of public housing in the state of Kuwait. PhD thesis, University of Manchester, UK.
Albert, A (2013) Strategies for construction hazard recognition. PhD thesis, University of Colorado at Boulder, USA.
Albert, A; Hallowell, M R and Kleiner, B M (2014) Enhancing construction hazard recognition and communication with energy-based cognitive mnemonics and safety meeting maturity model: Multiple baseline study. Journal of Construction Engineering and Management, 140(2): 04013042, ISSN 0733-9364
Alemayehu, S; Nejat, A; Ghebrab, T and Ghosh, S (2022) A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry. Engineering, Construction and Architectural Management, 29(7), pp. 2635-2664. ISSN 0969-9988
Alfandi, G R (2015) Investigating risk management capability of construction firms in the Gulf Cooperation Council (GCC) countries. PhD thesis, Brunel University, UK.
Algithami, S M (2017) The use of a system dynamics approach for modelling maturity of total quality management in Saudi construction firms. PhD thesis, University of Reading, UK.
Ali, Atif (2010) Investigating project management practices in public sector organisations of a less developed country. PhD thesis, RMIT University, Australia.
Aljarbou, M H (2022) A new sustainable public-private partnership (PPP) procurement system for infrastructure projects in the Kingdom of Saudi Arabia. PhD thesis, University of Bristol, UK.
Alkinani, H (2014) Models of training needs assessment for the Iraqi construction industry. PhD thesis, University of Salford, UK.
Alkizim, A O and Green, S (2005) Robustness in value engineering. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Alleem, R (2012) A usability based model for suggestion system evaluation of infrastructure organisations in the UAE. PhD thesis, University of Salford, UK.
Almarri, K (2019) Perceptions of the attractive factors for adopting public-private partnerships in the UAE. International Journal of Construction Management, 19(1), pp. 57-64. ISSN 1562-3599
Almarri, K (2021) Comparative analysis of the value for money factors of PPPs between the UAE and the UK. International Journal of Construction Management, 21(4), pp. 416-426. ISSN 1562-3599
Almarri, K (2023) The value for money factors and their interrelationships for smart city public-private partnerships projects. Construction Innovation, 23(4), pp. 815-832. ISSN 1471-4175
Almarri, K and Boussabaine, H (2021) Re-evaluating the risk costing agenda in PPP projects. Built Environment Project and Asset Management, 11(1), pp. 22-37. ISSN 2044-124X
Alqahtani, A (2019) An appraisal of the role of project management offices in promoting knowledge management within KSA construction companies. PhD thesis, University of Salford, UK.
Alqahtani, A (2019) An appraisal of the role of project management offices (PMO) in promoting knowledge management (km) within KSA construction companies. PhD thesis, University of Salford, UK.
Alqahtani, D (2022) A sustainability assessment framework for public-private partnerships (PPPs) in highway projects. PhD thesis, Syracuse University, USA.
Alzahrani, S (2015) Dynamic simulation of the impact of risk events and risk cost in KSA PPP projects. PhD thesis, University of Liverpool, UK.
Alzahrani, Sami Salem (2015) Developing a project management maturity model to initiate sustainable project performance and modernisation in the Kingdom of Saudi Arabia. PhD thesis, University of Adelaide, Australia.
Amaratunga, R D G (2001) Theory building in facilities management performance measurement: Application of some core performance measurement and management principles. PhD thesis, University of Salford, UK.
Ameyaw, C; Adjei-Kumi, T and Owusu-Manu, D-G (2015) Exploring value for money (VfM) assessment methods of public-private partnership projects in Ghana: A theoretical framework. Journal of Financial Management of Property and Construction, 20(3), pp. 268-285. ISSN 1366-4387
Amoah, C (2017) Public procurement reforms in Ghana: impact on the growth of the local construction industry. PhD thesis, Nelson Mandela Metropolitan University, South Africa.
Amponsah, C T and Forbes, J L (2012) Public-private partnerships: Critical factors for procurement of capital projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 211-221. ISSN 17514312
Andon, Paul James (2009) (Per)forming a public private partnership: The agency of accounting and other practices. PhD thesis, University of New South Wales, Australia.
Aranda-Mena, G; Blismas, N and Wakefield, R (2005) Factors affecting the uptake of e-business by small building enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Arif, M; Al Zubi, M; Gupta, A D; Egbu, C; Walton, R O and Islam, R (2017) Knowledge sharing maturity model for Jordanian construction sector. Engineering, Construction and Architectural Management, 24(1), pp. 170-188. ISSN 0969-9988
Arif, M; Egbu, C and Toma, T (2010) Knowledge retention in construction in the UAE. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Aritua, B; Male, S and Bower, D (2009) Defining the intelligent public sector construction client. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 75-82. ISSN 17514312
Aritua, B; Male, S; Bower, D and Madter, N (2011) Competencies for the intelligent public sector construction client. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 193-201. ISSN 17514304
Arowosafe, O I (2018) Contractors’ selection criteria for sustainable infrastructure delivery in Nigeria. PhD thesis, University of Derby, UK.
Asah-Kissiedu, M (2019) Development of an integrated safety, health and environmental management capability maturity model for Ghanaian construction companies. PhD thesis, University of the West of England, Bristol, UK.
Atmo, G and Duffield, C (2014) Improving investment sustainability for PPP power projects in emerging economies: Value for money framework. Built Environment Project and Asset Management, 4(4), pp. 335-351. ISSN 2044-124X
Attrill, R and Mickovski, S B (2020) Issues to be addressed with current BIM adoption, prior to the implementation of BIM level 3. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Ayinla, K O and Adamu, Z (2018) Bridging the digital divide gap in BIM technology adoption. Engineering, Construction and Architectural Management, 25(10), pp. 1398-1416. ISSN 0969-9988
Azzouz, A and Hill, P (2017) How BIM is assessed using arup's BIM maturity measure? In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Babangida, I; Olubodun, F and Kangwa, J (2012) Building refurbishment: Holistic evaluation of barriers and opportunities. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Babatunde, S (2015) Developing public private partnership strategy for infrastructure delivery in Nigeria. PhD thesis, Northumbria University, UK.
Babatunde, S O; Ekundayo, D and Adekunle, A O (2019) Analysis of BIM maturity level among AEC firms in developing countries: A case of Nigeria. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Babatunde, S O; Perera, S and Zhou, L (2016) Methodology for developing capability maturity levels for PPP stakeholder organisations using critical success factors. Construction Innovation, 16(1), pp. 81-110. ISSN 1471-4175
Babatunde, S O; Perera, S; Zhou, L and Udeaja, C (2016) Stakeholder perceptions on critical success factors for public-private partnership projects in Nigeria. Built Environment Project and Asset Management, 6(1), pp. 74-91. ISSN 2044-124X
Bakar, F A; Cheung, C M; Kaltungo, A Y; Mohandes, S R and Lou, E (2024) Key organisational attributes for developing a maturity model: Adopting immersive technologies in construction safety training. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Barbosa Resende, C (2021) Post-construction evaluation for work zones and construction engineers' training. PhD thesis, Iowa State University, USA.
Barutha, P J (2018) Integrated project delivery for industrial projects. PhD thesis, Iowa State University, USA.
Bavunoğlu, Z (2014) Assessment model for communication maturity levels of construction companies. PhD thesis, Izmir Institute of Technology, Turkey.
Bayar, M S (2019) BIM-enabled recommendations for digital handover process in the highways sector. PhD thesis, University of Salford, UK.
Bell, K L (1994) The strategic management of projects to enhance value for money for BAA plc. PhD thesis, Heriot-Watt University, UK.
Bemelmans, J; Voordijk, H; Vos, B and Buter, J (2012) Assessing buyer-supplier relationship management: Multiple case-study in the Dutch construction industry. Journal of Construction Engineering and Management, 138(1), pp. 163-176. ISSN 0733-9364
Bendi, D; Rana, M Q; Arif, M; Goulding, J S and Sawhney, A (2021) An off-site construction readiness maturity model for the Indian construction sector. Construction Innovation, 21(1), pp. 123-142. ISSN 1471-4175
Bendi, D; Rana, M Q; Arif, M; Lamb, S M; Sawhney, A and Kaushik, A K (2022) Assessing off-site readiness in construction organisations: Cases from India. Construction Innovation, 22(2), pp. 320-341. ISSN 1471-4175
Beset, D a A (2007) A model for assesing project management maturity level of architectural design offices (Arch-Pmm). PhD thesis, Izmir Institute of Technology (Turkey), Turkey.
Binions, O (2019) A study of corruption using the Institutional Analysis and Development framework with an application to the bidding phase of infrastructure procurement. PhD thesis, University College London, UK.
Blismas, N; Wakefield, R and Hauser, B (2010) Concrete prefabricated housing via advances in systems technologies: Development of a technology roadmap. Engineering, Construction and Architectural Management, 17(1), pp. 99-110. ISSN 0969-9988
Boateng, A; Ameyaw, C and Mensah, S (2022) Assessment of systematic risk management practices on building construction projects in Ghana. International Journal of Construction Management, 22(16), pp. 3128-3136. ISSN 1562-3599
Boothman, C; Higham, A and Scott, A (2014) Delivering school buildings using off- site construction: Stakeholders perceptions. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Boothman, J C; Higham, A and Horsfall, B (2012) Attaining zero defects within building schools for the future: A realistic target or a sisyphean task? In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Boothman C, H A (2013) Attaining zero defects within the UK's building schools for the future programme: Stakeholders' perceptions. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Botha, P S and Scheepbouwer, E (2015) Christchurch rebuild, New Zealand: Alliancing with a difference. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 121-129. ISSN 17514304
Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(1), pp. 60-74. ISSN 0969-9988
Boyd, D and Fellowes, J (2018) The problem of evaluating 'value for money' of school building programmes. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Bozorg Mehri, S.; Ghanbaripour, A. N.; Menadue, V. R. and Patching, A. (2026) From theory to practice of organizational project management maturity models: Systematic literature review. Built Environment Project and Asset Management, 16(2), pp. 263-285. ISSN 2044-124X
Brito, D M D; Ferreira, E D A M and Costa, D B (2021) Framework for building information modeling adoption based on critical success factors from Brazilian public organizations. Journal of Construction Engineering and Management, 147(7), ISSN 0733-9364
Broft, Rafaella; Badi, Sulafa M and Pryke, Stephen David (2016) Towards supply chain maturity in construction. Built Environment Project and Asset Management, 6(2), pp. 187-204. ISSN 2044-124X
Burke, C K A (2015) Generating social value through public sector construction procurement: A study of local authorities and SMEs. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Burman, E (2016) Assessing the operational performance of educational buildings against design expectations: a case study approach. PhD thesis, University College London, UK.
Burt, J and Purver, K (2014) Building information modelling for small-scale residential projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(3), pp. 134-140. ISSN 17514304
Campbell, J M and Smith, S D (2006) Improving industrial value and longevity of safety management research. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Casady, C B (2019) Assessing public-private partnership (PPP) governance, institutionalization, and market maturity in the United States and abroad. PhD thesis, Stanford University, USA.
Chan, D W M; Lam, P T I; Chan, A P C and Wong, J M W (2011) Guaranteed maximum price (GMP) contracts in practice: A case study of a private office development project in Hong Kong. Engineering, Construction and Architectural Management, 18(2), pp. 188-205. ISSN 0969-9988
Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chang, C Y and Chou, H Y (2014) Transaction-cost approach to the comparative analysis of user-pay and government-pay public-private partnership systems. Journal of Construction Engineering and Management, 140(9): 04014039, ISSN 0733-9364
Chang, V; Xu, Y K; Zhang, J and Xu, Q (2021) Research on intelligent manufacturing development approach for China's local valve industry. Smart and Sustainable Built Environment, 10(2), pp. 293-321. ISSN 2046-6099
Chen, K; Loo, S C and Alias, A (2024) A bibliometric review of maturity model studies in the construction industry. Journal of Construction in Developing Countries, 29(2), pp. 129-145. ISSN 1823-6499
Chen, L and Manley, K (2014) Validation of an instrument to measure governance and performance on collaborative infrastructure projects. Journal of Construction Engineering and Management, 140(5): 04014006, ISSN 0733-9364
Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Chen, Y; Dib, H and Cox, R F (2014) A measurement model of building information modelling maturity. Construction Innovation, 14(2), pp. 186-209. ISSN 1471-4175
Chen, Yu (2024) Improving information requirements management in complex rail transport projects. PhD thesis, University of Technology Sydney, Australia.
Cheung, E; Chan, A P C and Kajewski, S (2009) Enhancing value for money in public private partnership projects: Findings from a survey conducted in Hong Kong and Australia compared to findings from previous research in the UK. Journal of Financial Management of Property and Construction, 14(1), pp. 7-20. ISSN 1366-4387
Chinda, Thanwadee (2008) A system dynamics approach to construction safety culture. PhD thesis, Griffith University, Australia.
Chung, Demi (2012) Contractual approach to optimising risk sharing: A quantitative study of the multidimensional nature of risk in private provision of road infrastructure. PhD thesis, University of Sydney, Australia.
Crowe, P and Fortune, C J (2012) A preliminary method of classifying collaborative contractual behaviour in higher education construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Cruz, N F D and Marques, R C (2012) Delivering local infrastructure through PPPs: Evidence from the school sector. Journal of Construction Engineering and Management, 138(12), pp. 1433-1443. ISSN 0733-9364
Daddow, T and Skitmore, M (2004) Value management in practice: An interview survey. Construction Economics and Building, 4(2), pp. 11-18. ISSN 2204-9029
Dalton, M (2008) A risk breakdown structure for public sector construction projects. PhD thesis, University of Manchester, UK.
Dapaah Cecilia, O; Ernest, K; Kenneth, E; Juliet, O B; Edward, B and Maame, A I (2025) Disability inclusion studies in the construction industry: A mixed review approach. International Journal of Construction Management, 25(10), pp. 1186-1196. ISSN 1562-3599
Das, P; Perera, S; Senaratne, S and Osei-Kyei, R (2023) Paving the way for industry 4.0 maturity of construction enterprises: A state of the art review. Engineering, Construction and Architectural Management, 30(10), pp. 4665-4694. ISSN 0969-9988
Das, P; Perera, S; Senaratne, S and Osei-Kyei, R (2025) A smart modern construction enterprise maturity model for business scenarios leading to industry 4.0. Smart and Sustainable Built Environment, 14(1), pp. 23-49. ISSN 2046-6099
Dassah, M O and Uken, E (2010) Benefits and impacts of thrip-supported applied research projects. Journal of Engineering, Design and Technology, 8(3), pp. 296-313. ISSN 1726-0531
Davidson, R (2021) Innovation within private finance initiative projects: the influence of governance throughout the first stage of post-contract implementation. PhD thesis, University of Brighton, UK.
Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.
De Marco, A and Mangano, G (2013) Risk and value in privately financed health care projects. Journal of Construction Engineering and Management, 139(8), pp. 918-926. ISSN 0733-9364
Deakin, M (1997) The development of computer-based information systems for local authority property management: The underlying issues. Journal of Financial Management of Property and Construction, 2(1), pp. 59-82. ISSN 1366-4387
Deakin, M (1997) The development of computer-based information systems for local authority property management 2: The application. Journal of Financial Management of Property and Construction, 2(2), pp. 59-84. ISSN 1366-4387
Debella, F M (2020) Profitability improvement of construction firms through continuous improvement using rapid improvement principles and best practices. PhD thesis, Purdue University, USA.
Dreschler, M (2009) Fair competition: How to apply the 'economically most advantageous tender' award mechanism in the Dutch construction industry. PhD thesis, Delft University of Technology, Netherlands.
Duffield, C F and Regan, M (2004) Public private partnership arrangement for the Spencer Street station upgrade in Victoria, Australia. Journal of Financial Management of Property and Construction, 9(3), pp. 163-178. ISSN 1366-4387
Eadie, R and Potts, S (2016) Innovation partnership procurement: EU directive impact. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 238-247. ISSN 17514304
Ebekozien, A.; Thwala, W. D. and Samsurijan, M. S. (2026) Appraising circular economy business model adoption in construction projects to achieving Sustainable Development Goal 11. International Journal of Building Pathology and Adaptation, 44(3), pp. 685-703. ISSN 2398-4708
Ebekozien, A; Aigbavboa, C O; Aigbedion, M; Ogbaini, I F and Aginah, I L (2023) Integrated project delivery in the Nigerian construction sector: An unexplored approach from the stakeholders' perspective. Engineering, Construction and Architectural Management, 30(4), pp. 1519-1535. ISSN 0969-9988
Ebekozien, A; Aigbavboa, C O; Aliu, J and Thwala, W D (2024) Generic skills of future built environment practitioners in South Africa: Unexplored mechanism via students' perception. Journal of Engineering, Design and Technology, 22(2), pp. 561-577. ISSN 1726-0531
Ebekozien, A; Aigbavboa, C O; Thwala, W D D; Aigbedion, M I and Ogbaini, I F (2023) An appraisal of generic skills for Nigerian built environment professionals in workplace: The unexplored approach. Journal of Engineering, Design and Technology, 21(6), pp. 1841-1856. ISSN 1726-0531
Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Elbing, C and Devapriya, K A K (2004) Structured risk management process to achieve value for money in Public Private Partnerships. Journal of Financial Management of Property and Construction, 9(3), pp. 121-128. ISSN 1366-4387
Enoma, A (2005) The role of facilities management at the design stage. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Fan, S (2009) The effect of using group decision support systems on the processes and outcomes of value management studies. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Farrell, A and Sunindijo, R Y (2022) Overcoming challenges of early contractor involvement in local government projects. International Journal of Construction Management, 22(10), pp. 1902-1909. ISSN 1562-3599
Fath-Kolmes, E. M. and Long, T. B. (2026) Dynamic capabilities for sustainability and performance maturity levels: Evidence from the construction industry. Construction Management and Economics, 44(6), pp. 430-452. ISSN 0144-6193
Fatokun, A; Akintoye, A and Liyanage, C (2015) Renegotiation of public private partnership road contracts: Issues and outcomes. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.
Fernandes, L L D A and Costa, D B (2024) A conceptual model for measuring the maturity of an intelligent construction environment. Architectural Engineering and Design Management, 20(6), pp. 1403-1426. ISSN 1745-2007
Field, C and Davenport, D (1999) PFI policy since 1996 and the implications for small and medium sized enterprises in the UK construction industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Flynn, C (2020) Risk transfer in operational public private partnerships in the education sector. PhD thesis, Queen's University Belfast, UK.
Fortune, C (2001) Exploring the model selection process in the formulation of building project advice. Journal of Financial Management of Property and Construction, 6(3), pp. 167-177. ISSN 1366-4387
Fortune, C and Cox, O (2005) Current practices in building project contract price forecasting in the UK. Engineering, Construction and Architectural Management, 12(5), pp. 446-457. ISSN 0969-9988
Fortune, C and Hinks, J (1997) Model selection criteria in building project price forecast formulation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Fortune, C and Hinks, J (1999) Quality issues in building project price forecasting: factors affecting model selection. Journal of Construction Procurement, 5(2), pp. 129-140. ISSN 1358-9180
Ghadiminia, N (2021) Integration of cybersecurity in BIM-enabled facilities management organisations. PhD thesis, Birmingham City University, UK.
Ghalenoei, N; Babaeian Jelodar, M; Paes, D; Sutrisna, M and Rahmani, D (2025) Offsite construction and BIM integration framework across project life cycle. Journal of Construction Engineering and Management, 151(7): 05025002, ISSN 0733-9364
Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.
Gibb, A G F and Isack, F (2001) Client drivers for construction projects: Implications for standardization. Engineering, Construction and Architectural Management, 8(1), pp. 46-58. ISSN 0969-9988
Goh, B H (2016) Designing a whole-life building cost index in Singapore. Built Environment Project and Asset Management, 6(2), pp. 159-173. ISSN 2044-124X
Goh, C S (2014) Development of a capability maturity model for sustainable construction. PhD thesis, University of Hong Kong, Hong Kong.
Gomez, C and Gambo, M (2016) Evaluation of special purpose vehicle organisation skill sets taxonomy for effective public-private partnership infrastructure project delivery. Journal of Construction in Developing Countries, 21(1), pp. 147-165. ISSN 1823-6499
Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.
Griffith, A and Headley, J D (1998) Management of small building works. Construction Management and Economics, 16(6), pp. 703-709. ISSN 01446193
Gunarathna, C; Yang, R J; Jayasuriya, S; Yi, X; Arashpour, M; Ning, X and Heng, X (2026) Design and development of blockchain-enabled information management system for building integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(15), pp. 72-114. ISSN 0969-9988
Gunarathna, C; Yang, R J and Fernando, N (2018) Conflicts and management styles in the Sri Lankan commercial building sector. Engineering, Construction and Architectural Management, 25(2), pp. 178-201. ISSN 0969-9988
Gunaydin, H M (1999) Impact of information technologies on project management functions. PhD thesis, Illinois Institute of Technology, USA.
Guo, Y; Liu, J; Chen, C; Luo, X and Martek, I (2024) PPP project price mode typologies: A China-based comparative case study. Engineering, Construction and Architectural Management, 31(5), pp. 2034-2052. ISSN 0969-9988
Hadj, George (2024) Sustaining competitive advantage within the australian building industry: The strategic place of offshore procurement. PhD thesis, University of Melbourne, Australia.
Hailemarkos, H T (2020) Ethiopian construction project management maturity model determination and correlational prediction of project success. PhD thesis, Walden University, USA.
Hakim, H (2011) Effective contract structures and value for money in PFI social housing projects. PhD thesis, University of Leeds, UK.
Hampton, G; Baldwin, A N and Holt, G D (2012) Project delays and cost: Stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), pp. 73-91. ISSN 1366-4387
Han, Y; Du, H and Zhao, C (2025) Development of a digital transformation maturity model for the construction industry. Engineering, Construction and Architectural Management, 32(7), pp. 4384-4412. ISSN 0969-9988
Harada, S (2015) Bidding for private finance initiative projects: An analysis. Journal of Financial Management of Property and Construction, 20(2), pp. 188-202. ISSN 1366-4387
Harris Sr., C E (2023) Public private partnerships in infrastructure: A study on performance and equity improvement. DBA thesis, National University, USA.
Hartwell, J (2018) Construction organisation structure and innovation adoption. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Hartwell, J C; Upadhyay, Y and Sourani, A (2019) Influential factors of life cycle management in education PFI projects. Built Environment Project and Asset Management, 9(2), pp. 302-314. ISSN 2044-124X
Hatamleh, M T (2020) Enhancing the management proficiencies in developing countries: The impact of project risk management within a project management maturity model on project performance. PhD thesis, University of Alabama, USA.
Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects. PhD thesis, University of the West of England, Bristol, UK.
Henjewele, C; Sun, M and Fewings, P (2008) Uncertainties and the challenge of long-term value for money in the delivery of PFI projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Henjewele, C; Sun, M and Fewings, P (2011) Value for money optimisation and sustainability in PFI projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Henjewele, C; Sun, M and Fewings, P (2012) Analysis of factors affecting value for money in UK PFI projects. Journal of Financial Management of Property and Construction, 17(1), pp. 9-28. ISSN 1366-4387
Hermans, M; Volker, L and Eisma, P (2014) A public commissioning maturity model for construction clients. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Hermans, M; van Zoest, S and Volker, L (2016) Assessing the maturity of public construction client organisations. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Holt, G D; Proverbs, D G and Whitehouse, L (2001) A survey of public sector procurement in England. Journal of Construction Procurement, 7(1), pp. 3-10. ISSN 1358-9180
Hoseini, E; Bosch-Rekveldt, M and Hertogh, M (2018) Risk management maturity of construction projects in the Netherlands. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Hosseinian, S M; Farahpour, E and Carmichael, D G (2021) An optimum multiple outcomes sharing model with multiple risk-averse agents. Engineering, Construction and Architectural Management, 28(9), pp. 2788-2810. ISSN 0969-9988
Hosseinian, Seyedmahdi (2013) Optimal outcome sharing arrangements in construction target contracts. PhD thesis, University of New South Wales, Australia.
Hu, Z; Chen, S and Zhang, X (2014) Value for money and its influential factors: An empirical study of PPP projects in Japan. Built Environment Project and Asset Management, 4(2), pp. 166-179. ISSN 2044-124X
Hyatt, B A (2023) Construction data leaders’ descriptions of their organization’s analytics maturity. DBA thesis, Grand Canyon University, USA.
Ibrahim, A D; Price, A D F and Dainty, A R J (2008) Is the local improvement finance trust (LIFT) procurement initiative delivering the expected economies of scale? Results from three case studies. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ibrahim, A D; Price, A D F and Dainty, A R J (2009) Evaluation of key practices under the local improvement finance trust (lift) initiative for UK healthcare facilities. Engineering, Construction and Architectural Management, 16(5), pp. 504-518. ISSN 0969-9988
Inuwa, I I (2018) Unethical professional practices in tendering of public building procurement in Bauchi Metropolis, Nigeria. African Journal of Built Environment Research, 2(1), pp. 55-73. ISSN 2414-0236
Ireland, P N (2005) Supply chain management in construction: an analysis of the appropriateness of proactive supply chain management thinking for the construction industry. PhD thesis, University of Birmingham, UK.
Issa, D; Emsley, M and Krikham, R (2012) Reviewing risk allocation for infrastructure pfi: Between theory and practice. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ive, G (2006) Re-examining the costs and value ratios of owning and occupying buildings. Building Research & Information, 34(3), pp. 230-245. ISSN 0961-3218
Jackson, S (2002) Development of a tool for whole life design appraisal. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Javed, A (2024) Optimizing infrastructure resilience through utility maturity. PhD thesis, University of Florida, USA.
Jawad, S and Ledwith, A (2022) A measurement model of project control systems success for engineering and construction projects case study: Contractor companies in saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 29(3), pp. 1218-1240. ISSN 0969-9988
Jayanetti, J. K. D. D. T.; Fernando, M. H.; Ranadewa, K. A. T. O. and Perera, B. A. K. S. (2026) Fusion of machine learning to enhance the adaptability of lean construction maturity models (lcmms). Journal of Engineering, Design and Technology, 24(5), pp. 1298-1321. ISSN 1726-0531
Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988
Jin, H; Chan, M and Bai, Y (2025) Joint optimization of critical concession parameters for sustainable PPP contracts. Journal of Construction Engineering and Management, 151(6): 04025051, ISSN 0733-9364
Johannes, Koos (2023) Crafting intrapreneurial stewardship: An institutional perspective on client-led innovation in smart building maintenance. PhD thesis, University of Twente, Netherlands.
Johansen, J B; Jensen, P A and Thuesen, C (2017) Maturity model for strategic collaboration in sustainable building renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Jones, G M (2017) A correlational study of the relationship between organizational objectives alignment and North American construction project success. PhD thesis, Northcentral University, USA.
Jumat, A R; Coffey, V and Skitmore, M (2012) Stakeholder service delivery expectations of military facilities management. Built Environment Project and Asset Management, 2(2), pp. 146-166. ISSN 2044-124X
Jupp, B C (2003) Forecasting value in building projects. PhD thesis, Loughborough University, UK.
Kakitahi, J M (2014) Causality, magnitude and impact mitigation of rework in Uganda. PhD thesis, Lund University, Sweden.
Kapogiannis, G (2013) A conceptual framework for project managers to improve projects performance. PhD thesis, University of Salford, UK.
Kavishe, N; Jefferson, I and Chileshe, N (2019) Evaluating issues and outcomes associated with public-private partnership housing project delivery: Tanzanian practitioners' preliminary observations. International Journal of Construction Management, 19(4), pp. 354-369. ISSN 1562-3599
Kaya, H D and Dikmen, I (2024) Using system dynamics to support strategic digitalization decisions. Journal of Construction Engineering and Management, 150(4): 04024009, ISSN 0733-9364
Ke, Y (2014) Is public-private partnership a panacea for infrastructure development? The case of Beijing national stadium. International Journal of Construction Management, 14(2), pp. 90-100. ISSN 1562-3599
Kelly, J; Male, S and Gronqvist, M (2000) Characteristics of refurbishing retailers as clients of the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Keraminiyage, K P (2009) Achieving high process capability maturity in construction organisations. PhD thesis, University of Salford, UK.
Khadaroo, M I (2006) Exploring perceptions of accountability and value for money in school PPP/PFI contracts. PhD thesis, Queen's University Belfast, UK.
Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.
Khadour, Lina (2010) Total quality environmental management (tqem) framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.
Khoa, V. D.; Chinda, T. and Nguyen, N. H. (2026) Knowledge management process to enhance construction competitiveness in the long term: System dynamics modelling approach. International Journal of Construction Management, 26(9), pp. 1960-1977. ISSN 1562-3599
Kim, H S (1998) Evaluation of quality during early design: A prerequisite to defining value for money for the client. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Kim, H-s (1998) Value for money in building design: Modelling the cost-quality relationships. PhD thesis, University of Reading, UK.
Kim, J H and Fisher, N (2001) Knowledge management for small occasional construction industry clients: A theoretical framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kirkham, R J and Boussabaine, A H (2000) Developing a framework for whole of life costing in the national health service estate. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Kissi, E; Ahadzie, D K; Adjei-Kumi, T and Badu, E (2017) Rethinking the challenges to the pricing of projects in the Ghanaian construction industry. Journal of Engineering, Design and Technology, 15(5), pp. 700-719.
Kissi, E; Boateng, E B; Adjei-Kumi, T and Badu, E (2017) Principal component analysis of challenges facing the implementation of value engineering in public projects in developing countries. International Journal of Construction Management, 17(2), pp. 142-150. ISSN 1562-3599
Konukcu, S (2011) A knowledge chain framework for construction supply chains. PhD thesis, Loughborough University, UK.
Krainer, Christiane Wagner Mainardes (2021) Model of social capital accumulation in civil construction companies. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.
Kukah, A S K; Owusu-Manu, D G; Badu, E and Edwards, D J (2024) Reasons for entering into Ghanaian public-private partnership (PPP) power projects. Journal of Engineering, Design and Technology, 22(3), pp. 854-878. ISSN 1726-0531
Kulaksiz, T (2019) Analysis of factors influencing return on investment (ROI) for building information modeling (BIM) implementation. PhD thesis, Wayne State University, USA.
Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects. PhD thesis, Heriot-Watt University, UK.
Lahdenperä, P (2017) Towards a coherent theory of project alliancing: Discovering the system's complex mechanisms yielding value for money. Construction Economics and Building, 17(2), pp. 41-61. ISSN 2204-9029
Lahdenperä, P (2024) Design–build with a development phase: An initiation and the first trials. Construction Economics and Building, 24(4-5), pp. 18-42. ISSN 2204-9029
Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. PhD thesis, Cardiff University, UK.
Laitinen, K; Luhtala, M; Örmä, M and Vaismaa, K (2024) Productivity development enablers in the infrastructure sector: Capability maturity model integration approach. Built Environment Project and Asset Management, 14(2), pp. 201-227. ISSN 2044-124X
Langford, D A; Kennedy, P; Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(8), pp. 831-840. ISSN 01446193
Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(6), pp. 2231-2254. ISSN 0969-9988
Langston, C and Ghanbaripour, A N (2016) A management maturity model (MMM) for project-based organisational performance assessment. Construction Economics and Building, 16(4), pp. 68-85. ISSN 2204-9029
Laryea, S (2019) Procurement strategy and outcomes of a new universities project in South Africa. Engineering, Construction and Architectural Management, 26(9), pp. 2060-2083. ISSN 0969-9988
Laryea, S and Watermeyer, R (2014) Innovative construction procurement at Wits University. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 220-231. ISSN 17514304
Laryea, S and Watermeyer, R (2016) Early contractor involvement in framework contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 4-16. ISSN 17514304
Lawani, K; Hare, B and Cameron, I (2019) Evaluating workplace trust as a construct of worker engagement in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(3), pp. 125-134. ISSN 17514304
Le, A T H; Domingo, N; Rasheed, E and Park, K (2022) Maturity model of building maintenance management for New Zealand's state schools. Building Research & Information, 50(4), pp. 438-451. ISSN 0961-3218
Le, A T H; Domingo, N; Rasheed, E and Park, K (2022) Strategic collaboration in managing existing buildings in New Zealand's state schools: School managers' perspectives. Construction Management and Economics, 40(3), pp. 173-185. ISSN 01446193
Le, A T H and Sutrisna, M (2024) Project cost control system and enabling-factors model: PLS-SEM approach and importance-performance map analysis. Engineering, Construction and Architectural Management, 31(6), pp. 2513-2535. ISSN 0969-9988
Lee, F K S (2016) Construction contractor selection criteria: the effects of relational norms, price and prequalification. PhD thesis, University of Reading, UK.
Li, B (2003) Risk management of construction public private partnership projects. PhD thesis, Glasgow Caledonian University, UK.
Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2004) Value for money factors in the development of PPP/PFI Construction projects. Journal of Financial Management of Property and Construction, 9(1), pp. 43-52. ISSN 1366-4387
Liang, C (2016) Development of a multifunctional building information modelling (BIM) maturity model. PhD thesis, University of Hong Kong, Hong Kong.
Liang, C; Lu, W; Rowlinson, S and Zhang, X (2016) Development of a multifunctional BIM maturity model. Journal of Construction Engineering and Management, 142(11): 06016003, ISSN 0733-9364
Liguori, D; Sommerville, J and Manase, D (2012) Probabilistic pre-requisites contributing to successful housing association partnering. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Lin, J J and Golparvar-Fard, M (2021) Visual and virtual production management system for proactive project controls. Journal of Construction Engineering and Management, 147(7): 2045, ISSN 0733-9364
Lingard, H; Oswald, D and Le, T (2019) Embedding occupational health and safety in the procurement and management of infrastructure projects: Institutional logics at play in the context of new public management. Construction Management and Economics, 37(10), pp. 567-583. ISSN 01446193
Liu, J; Guo, Y; Martek, I; Chen, C and Tian, J (2022) A phase-oriented evaluation framework for China's PPP projects. Engineering, Construction and Architectural Management, 29(9), pp. 3737-3753. ISSN 0969-9988
London, B C K and Gajendran, T (2010) Diffusing cultural awareness and maturity in lean managed organizations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Love, P E D; Leonard, D; Matthews, J; Ford, G and Fang, W (2024) Setting a course to validate and operationalize quality II in construction. Journal of Construction Engineering and Management, 150(12): 06024002, ISSN 0733-9364
Love, P E D; Mistry, D and Davis, P R (2010) Price competitive alliance projects: Identification of success factors for public clients. Journal of Construction Engineering and Management, 136(9), pp. 947-956. ISSN 0733-9364
Lu, W; Chen, K; Zetkulic, A and Liang, C (2021) Measuring building information modeling maturity: A Hong Kong case study. International Journal of Construction Management, 21(3), pp. 299-311. ISSN 1562-3599
Madritsch, T and Ebinger, M (2011) A management framework for the built environment: BEM2/BEM3. Built Environment Project and Asset Management, 1(2), pp. 111-121. ISSN 2044-124X
Mahdi, H S and Carmichael, D G (2014) Optimal sharing arrangement for multiple project outcomes. Journal of Financial Management of Property and Construction, 19(3), pp. 264-280. ISSN 1366-4387
Makahaube, J S (2020) Performance measure methodology of project management practices in local government agencies. PhD thesis, University of Texas at El Paso, USA.
Manege, S L and Kennedy, C J (2022) Investigating whole life costing awareness in Tanzania building construction industry. International Journal of Construction Management, 22(15), pp. 2914-2921. ISSN 1562-3599
Mangano, G; Castelblanco, G; De Marco, A and Ottaviani, F M (2025) Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), pp. 193-210. ISSN 2044-124X
Manu, P; Mahamadu, A M; Booth, C; Olomolaiye, P O; Coker, A; Ibrahim, A and Lamond, J (2019) Infrastructure procurement capacity gaps in Nigeria public sector institutions. Engineering, Construction and Architectural Management, 26(9), pp. 1962-1985. ISSN 0969-9988
Marinelli, M; Petroutsatou, K; Fragkakis, N and Lambropoulos, S (2018) Rethinking new public infrastructure value for money in recession times: The Greek case. International Journal of Construction Management, 18(4), pp. 331-342. ISSN 1562-3599
Marocco, M; Cacciaguerra, E and Garofolo, I (2024) An operational framework for implementing digital systems in public administrations' processes in the design phase. Architectural Engineering and Design Management, 20(3), pp. 411-430. ISSN 1745-2007
Matipa, W M; Kelliher, D and Keane, M (2008) How a quantity surveyor can ease cost management at the design stage using a building product model. Construction Innovation, 8(3), pp. 164-181. ISSN 1471-4175
Mbabu, Alex (2025) Digital twins in lean strategic facility management in the UK healthcare sector: A proposed framework to enabling lean strategic facility management in healthcare operations in the UK. PhD thesis, University of Salford, UK.
McArdle, G and Gunning, J G (2018) Enhancing value for money in public procurement of Northern Ireland construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(5), pp. 207-219. ISSN 17514304
Medimagh, S and Triki, A (2019) The PPP performance based on the co-creation with customers. Built Environment Project and Asset Management, 9(5), pp. 642-654. ISSN 2044-124X
Meifrinaldi, S R C P (2024) Stakeholder readiness for integrated project delivery in public sector construction: The role of maturity models. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Meng, X (2008) Development of assessment framework for construction supply chain relationships. PhD thesis, University of the West of England, Bristol, UK.
Meng X, H F (2013) The application of whole life costing in PFI/PPP projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Mills, G R W; Phiri, M; Erskine, J and Price, A D F (2015) Rethinking healthcare building design quality: An evidence-based strategy. Building Research & Information, 43(4), pp. 499-515. ISSN 0961-3218
Mirzaee, A M and Martek, I (2026) Utilizing multiple intelligences as a means to improving claim performance outcomes in project-based organizations. Engineering, Construction and Architectural Management, 33(1), pp. 532-551. ISSN 0969-9988
Mladenovic, G; Vajdic, N; Wündsch, B and Temeljotov-Salaj, A (2013) Use of key performance indicators for PPP transport projects to meet stakeholders' performance objectives. Built Environment Project and Asset Management, 3(2), pp. 228-249. ISSN 2044-124X
Mlybari, E A A (2011) Managing value, requirements and risk in the appraisal stage of UK construction projects. PhD thesis, University of Leeds, UK.
Mohamed, S and Chinda, T (2011) System dynamics modelling of construction safety culture. Engineering, Construction and Architectural Management, 18(3), pp. 266-281. ISSN 0969-9988
Mollasalehi, S (2022) The benefits of BIM use to improve information flow: making the design process more leaner. PhD thesis, University of Salford, UK.
Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180
Morris, Austin J (2022) Project management maturity and project success in NSW local government. PhD thesis, University of Technology Sydney, Australia.
Morris, J (1999) Improving construction design: the lean thinking paradigm. PhD thesis, Cranfield University, UK.
Motaleb, O H (2014) Development of a risk response model to handle delays of construction projects in the United Arab Emirates. PhD thesis, Robert Gordon University, UK.
Mulu, T and Smith, N J (2008) Innovative road infrastructure financing in Jamaica and the developing countries. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Munir, M (2020) Development of a building information modelling asset value realisation model. PhD thesis, University of Liverpool, UK.
Munir, Mustapha (2020) Development of a building information modelling asset (bimasset) value realisation model. PhD thesis, University of Liverpool, UK.
Musonda, I and Gambo, N (2021) Mediation effect of partnership on procurement strategy factors influencing sustainable smart housing development, Nigeria. Built Environment Project and Asset Management, 11(3), pp. 454-467. ISSN 2044-124X
Musonda, I; Lusenga, E and Okoro, C (2021) Rating and characterization of an organization's safety culture to improve performance. International Journal of Construction Management, 21(2), pp. 181-193. ISSN 1562-3599
Navendren, D; Manu, P; Shelbourn, M and Mahamadu, A M (2014) Challenges to building information modelling implementation in UK: Designers' perspectives. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ndekugri, I and Turner, A (1994) Building procurement by design and build approach. Journal of Construction Engineering and Management, 120(2), pp. 243-256. ISSN 0733-9364
Nesensohn, C; Bryde, D; Ochieng, E and Fearon, D (2014) Maturity and maturity models in lean construction. Construction Economics and Building, 14(1), pp. 45-59. ISSN 2204-9029
Nesensohn C, B D J and Fearon D J, O E G (2013) Combining lean construction with maturity models. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Nicholson, M P and Naamani, Z (1992) Managing architectural design: a recent survey. Construction Management and Economics, 10(6), pp. 479-487. ISSN 01446193
Nyagormey, J J; Baiden, B K; Nani, G and Adinyira, E (2020) Review on criteria for evaluating unsolicited public-private partnership PPP proposals from 2004 to 2018. International Journal of Construction Management, 22(12), pp. 2243-2257. ISSN 1562-3599
O'Gorman, Sean Thomas (2024) A project management maturity model for precast concrete manufacturers. PhD thesis, University of Adelaide, Australia.
Obeng-Ahenkora, N. K.; Danso, H. and Kheni, N. A. (2026) Principal component analysis of factors influencing the choice of procurement methods for the procurement of construction materials in Ghana. Engineering, Construction and Architectural Management, 33(7), pp. 5300-5317. ISSN 0969-9988
Obieje, I D (2019) Improving the achievement of value for money in construction procurement under the Nigerian Public Procurement Act (2007). PhD thesis, University of Salford, UK.
Oduyemi, O; Okoroh, M and Dean, A (2014) Barriers to life cycle costing usage. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ogunbiyi, O; Goulding, J S and Oladapo, A (2014) An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Construction Innovation, 14(1), pp. 88-107. ISSN 1471-4175
Ogunsanya, O A (2018) Integrated sustainable procurement model for the Nigerian construction industry. PhD thesis, University of Johannesburg, South Africa.
Oke, A E and Aghimien, D O (2018) Drivers of value management in the Nigerian construction industry. Journal of Engineering, Design and Technology, 16(2), pp. 270-284. ISSN 1726-0531
Oke, A E; Ogunsemi, D R and Adeyelu, M (2019) Quadrant and gap analysis of required and exhibited quantity surveyors’ competencies. Journal of Engineering, Design and Technology, 17(6), pp. 1161-1173. ISSN 1726-0531
Opoku, A and Fortune, C (2010) Promoting organizational learning and project sustainability in the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Osei-Kyei, R; Chan, A P C and Dansoh, A (2020) Project selection index for unsolicited public-private partnership proposals. International Journal of Construction Management, 20(6), pp. 555-566. ISSN 1562-3599
Osuizugbo, I C and Adenuga, O A (2024) Decisive factors for decision-making to achieving sustainable procurement in construction projects. International Journal of Building Pathology and Adaptation, 42(6), pp. 1185-1202. ISSN 2398-4708
Otegbulu, A C and N.Onukwube, H (2007) Enhancing real estate investment through tero- value technology. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Owolabi, H (2018) Public accountability: The case of government guarantee scheme in PFI/PPP projects. PhD thesis, University of the West of England, Bristol, UK.
Palaneeswaran, E and Kumaraswamy, M M (2000) Contractor selection for design/build projects. Journal of Construction Engineering and Management, 126(5), pp. 331-339. ISSN 0733-9364
Panquet, Q; Bourgault, M; Pellerin, R; Danjou, C and Perrier, N (2024) A process-improvement method for implementing earned value-based project management in organizations. Journal of Construction Engineering and Management, 150(12): 04024170, ISSN 0733-9364
Pantzartzis, E; Price, A D F and Pascale, F (2016) A built environment response to the rising costs of dementia. Journal of Financial Management of Property and Construction, 21(2), pp. 160-187. ISSN 1366-4387
Parchamijalal, M; Moradi, S and Zabihi Shirazi, M (2023) Claim management office maturity model (cmomm) in project-oriented organizations in the construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 74-104. ISSN 0969-9988
Park, S H and Flanagan, R (2009) Integrating whole life cost into the evaluation of design-build in Korea. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Patil, N A and Laishram, B S (2016) Sustainability of Indian PPP procurement process: Development of strategies for enhancement. Built Environment Project and Asset Management, 6(5), pp. 491-507. ISSN 2044-124X
Perrenoud, A; Short, E and Cowan, D (2023) Development and validation of elements for the construction risk maturity assessment (CRMA). International Journal of Construction Education and Research, 19(1), pp. 42-60. ISSN 1557-8771
Phang, T C H; Chen, C and Tiong, R L K (2020) New model for identifying critical success factors influencing BIM adoption from precast concrete manufacturers' view. Journal of Construction Engineering and Management, 146(4): 04020014, ISSN 0733-9364
Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.
Pornthepkasemsant, P and Charoenpornpattana, S (2019) Identification of factors affecting productivity in Thailand’s construction industry and proposed maturity model for improvement of the productivity. Journal of Engineering, Design and Technology, 17(5), pp. 849-861. ISSN 1726-0531
Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Andric, J; Manu, P and Mzyece, D (2021) An investigation into macro BIM maturity and its impacts: A comparison of qatar and the United Kingdom. Architectural Engineering and Design Management, 17(5-6), pp. 496-515. ISSN 1745-2007
Quaigrain, R A and Issa, M H (2023) Comparative analysis of leading and lagging indicators of construction disability management performance: An exploratory study. International Journal of Construction Management, 23(7), pp. 1205-1213. ISSN 1562-3599
Rahmani, F (2021) Challenges and opportunities in adopting early contractor involvement (ECI): Client's perception. Architectural Engineering and Design Management, 17(1-2), pp. 67-76. ISSN 1745-2007
Rahmani, F; Khalfan, M M A and Maqsood, T (2016) Lessons learnt from the use of relationship-based procurement methods in Australia: Clients' perspectives. Construction Economics and Building, 16(2), pp. 1-13. ISSN 2204-9029
Rahmani, F; Maqsood, T and Khalfan, M (2017) An overview of construction procurement methods in Australia. Engineering, Construction and Architectural Management, 24(4), pp. 593-609. ISSN 0969-9988
Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.
Rashidian, S; Drogemuller, R and Omrani, S (2024) An integrated building information modelling, integrated project delivery and lean construction maturity model. Architectural Engineering and Design Management, 20(6), pp. 1454-1470. ISSN 1745-2007
Rashidian, S; Drogemuller, R; Omrani, S and Banakar, F (2024) A review of the interrelationships and characteristics of building information modeling, integrated project delivery and lean construction maturity models. Smart and Sustainable Built Environment, 13(3), pp. 584-608. ISSN 2046-6099
Rashidian, Sara (2024) An integrated building information modelling, integrated project delivery and lean construction maturity model. PhD thesis, Queensland University of Technology, Australia.
Razkenari, M A (2019) Framework for measuring industrialized construction maturity. PhD thesis, University of Florida, USA.
Reischl, J N (2009) Toward a theory of morality: An empirical study of cognitive moral development in market channel dyads in the construction industry using the defining issues test. DBA thesis, Nova Southeastern University, USA.
Ren, Z; Kwaw, P and Yang, F (2012) Ghana's public procurement reform and the continuous use of the traditional procurement system: The way forward. Built Environment Project and Asset Management, 2(1), pp. 56-69. ISSN 2044-124X
Rintala, Kai M (2004) The economic efficiency of accommodation service PFI projects. PhD thesis, University College London, UK.
Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(2), pp. 181-197. ISSN 1466433X
Rodrigo, V (2016) Development of an e-business capability maturity model for construction organisations. PhD thesis, Northumbria University, UK.
Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193
Rutter, D and Gidado, K (2004) Value for money and facilities performance: A systems approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Rutter, D and Gidado, K (2005) PFI projects: Their scope for delivering vfm. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Rutter, D and Potter, B (2003) The role of multi-criterion decision methods (MCDM) in securing best value from buildings procured through PPP/PFI. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Sagoo, A S (2014) A decision support system for evaluating local authority housing maintenance strategies in the United Kingdom. PhD thesis, University of Derby, UK.
Saka, A B; Olaore, F O and Olawumi, T O (2019) Post-contract material management and waste minimization: An analysis of the roles of quantity surveyors. Journal of Engineering, Design and Technology, 17(4), pp. 793-807. ISSN 1726-0531
Sankaran, B and O'Brien, W J (2018) Bayesian second-order factor model for maturity assessment of CIM technologies and practices at highway agencies. Journal of Construction Engineering and Management, 144(4): 04018015, ISSN 0733-9364
Sankaran, Bharathwaj (2017) Civil integrated management for highway infrastructure projects: Analyses of trends, specifications, impact, and maturity. PhD thesis, University of Texas at Austin, USA.
Saunders, A (1998) Aspects of funding for BOOT projects. Engineering, Construction and Architectural Management, 5(1), pp. 22-30. ISSN 0969-9988
Sauni, M; Luomala, H; Kolisoja, P and Vaismaa, K (2022) Framework for implementing track deterioration analytics into railway asset management. Built Environment Project and Asset Management, 12(6), pp. 871-886. ISSN 2044-124X
Scala, N M; Alves, T d C L; Hawkins, D; Schiavone, V and Liu, M (2025) Application of the maturity model for collaborative scheduling for construction projects. Engineering, Construction and Architectural Management, 32(11), pp. 7399-7425. ISSN 0969-9988
Scala, N M; Liu, M; Alves, T C L; Schiavone, V and Hawkins, D (2023) The gold standard: Developing a maturity model to assess collaborative scheduling. Engineering, Construction and Architectural Management, 30(4), pp. 1636-1656. ISSN 0969-9988
Shah, M A; Kumar, S; Shah, M A and Rasool, A (2024) Examining the relationship among critical success factors (CSFs) for delivery of sustainable public-private partnership projects. Journal of Financial Management of Property and Construction, 29(2), pp. 250-273. ISSN 1366-4387
Shahrin, F and Udeaja, C (2019) Evaluation of the challenges in using building information modelling to improve client’s requirements delivery. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Shankar, R and Tan, W (2024) Bid variability in public-private partnerships: Lessons from asset monetization through the toll-operate-transfer model in India. Journal of Construction Engineering and Management, 150(12): 05024015, ISSN 0733-9364
Shen, Q (1993) A knowledge based structure for implementing Value Management in the design of office buildings. PhD thesis, University of Salford, UK.
Shen, Q; Lo, K K and Wang, Q (1998) Priority setting in maintenance management: A modified multi-attribute approach using analytic hierarchy process. Construction Management and Economics, 16(6), pp. 693-702. ISSN 01446193
Sherratt, F and Sherratt, S (2018) PPP problems: Challenging academic compliance with economic opportunism and exploitation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Sherratt, F; Sherratt, S and Ivory, C (2020) Challenging complacency in construction management research: The case of PPPs. Construction Management and Economics, 38(12), pp. 1086-1100. ISSN 01446193
Shi, L; He, Y and Onishi, M (2023) Effect of the internal agency problem on risk-sharing incentive contracts in public-private partnership projects. Journal of Construction Engineering and Management, 149(12): 04023126, ISSN 0733-9364
Shwarka, M and Anigbogu, N A (2012) Impact of the public procurement reform on public building project delivery in Nigeria. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Siebelink, S; Voordijk, H J T; Endedijk, M D and Adriaanse, A M (2025) Exploring strategies for managing maturity variations among project partners: From underperformance and controlling weak links to stretching capabilities. Construction Management and Economics, 43(4), pp. 243-261. ISSN 0144-6193
Siebelink, S; Voordijk, J T and Adriaanse, A (2018) Developing and testing a tool to evaluate BIM maturity: Sectoral analysis in the Dutch construction industry. Journal of Construction Engineering and Management, 144(8): 05018007, ISSN 0733-9364
Siew, Yung (2014) Evaluating and enhancing the impact of sustainability reporting tools (SRTs). PhD thesis, University of New South Wales, Australia.
Signor, R; Love, P E D; Belarmino, A T N and Alfred Olatunji, O (2020) Detection of collusive tenders in infrastructure projects: Learning from operation car wash. Journal of Construction Engineering and Management, 146(1): 05019015, ISSN 0733-9364
Silva, Edson Neves da (2021) Proposal for a management system integrating the principles of lean construction with the aspects of quality, safety, environment and occupational health management, focusing on small civil construction companies. PhD thesis, Universidade Federal Fluminense, Brazil.
Simon, L; Jefferies, M; Davis, P and Newaz, M T (2020) Developing a theoretical success factor framework for the tendering phase of social infrastructure PPPs. International Journal of Construction Management, 20(6), pp. 613-627. ISSN 1562-3599
Simpson, Y and Dye, J (2010) Measuring value for money on ministry of defence minor new works projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Smith, A and Wilkins, B (1996) Team relationships and related critical factors in the successful procurement of health care facilities. Journal of Construction Procurement, 2(1), pp. 30-40. ISSN 1358-9180
Soewin, E and Chinda, T (2022) Development of a construction performance index in the construction industry: System dynamics modelling approach. International Journal of Construction Management, 22(10), pp. 1806-1817. ISSN 1562-3599
Staples, Warren (2010) Public value in public sector infrastructure procurement. PhD thesis, RMIT University, Australia.
Stewart, P J (2000) Strategic IT maturity of construction companies. PhD thesis, Royal Melbourne Institute of Technology, Australia.
Stojanovic, V; Falconer, R; Blackwood, D; Paterson, G; Fleming, M and Bell, S (2014) Interactive visualisation of heat loss and gain for early-stage energy appraisal of the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Succar, B; Sher, W and Williams, A (2012) Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, 8(2), pp. 120-142. ISSN 1745-2007
Sun, M; Vidalakis, C and Oza, T (2009) A change management maturity model for construction projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Sundaraj, G (2012) The significance and co-dependency of 'robustness' in PFI projects: A granting authority perspective. PhD thesis, University of Salford, UK.
Sutrisna, M; Pellicer, E; Torres-Machi, C and Picornell, M (2020) Exploring earned value management in the Spanish construction industry as a pathway to competitive advantage. International Journal of Construction Management, 20(1), pp. 1-12. ISSN 1562-3599
Szabo, E; Hansen, H and Sherratt, F (2023) Making the complicated simple? The case of construction safety culture. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Tam, G C K (2018) Managing project sustainability: a study of the construction industry in Hong Kong. PhD thesis, London South Bank University, UK.
Tamburro, N and Wood, P (2014) Alliancing in Australia: Competing for thought leadership. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 75-82. ISSN 17514304
Tariq, M (2012) Green supply chain assessment model for construction projects in the UAE. PhD thesis, University of Salford, UK.
Tehami, M and Seddiki, M (2023) Investigation toward the adoption of building information modelling in Algeria from architects' perspective. Journal of Construction in Developing Countries, 28(2), pp. 329-352. ISSN 1823-6499
Tembo, M; Kahanji, C and Mwanaumo, E M (2024) Cultivating procurement strategies to manage the tender price level for public infrastructure: : A case study of IRCP (World Bank) projects in Zambia. Journal of Construction Business and Management, 7(1), pp. 16-33. ISSN 2521-0165
Tengan, C; Aigbavboa, C O; Guribie, F and Annor-Asubonteng, J (2019) Analysis of the outcome features of effective monitoring and evaluation in construction project delivery. Journal of Engineering, Design and Technology, 17(6), pp. 1192-1201. ISSN 1726-0531
Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.
Teo, P L; Bridge, A J; Gray, J and Jefferies, M C (2011) Developing a research method to test a new first-order decision making model for the procurement of public sector major infrastructure. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Tidakbi, Emmanuel Tinakpa (2002) Risk management in the public sector: The case of the National Health Service, United Kingdom. PhD thesis, University College London, UK.
Troje, D (2023) Path dependencies and sustainable facilities management: A study of housing companies in Sweden. Building Research & Information, 51(8), pp. 965-978. ISSN 0961-3218
Tutesigensi, A; Kibwami, N and Matege, S B (2021) The status of value management practice on construction projects in Uganda and strategies for improvement. Journal of Construction in Developing Countries, 26(2), pp. 251-267. ISSN 1823-6499
Van Roy, A F and Firdaus, A (2020) Building information modelling in Indonesia: Knowledge, implementation and barriers. Journal of Construction in Developing Countries, 25(2), pp. 199-217. ISSN 1823-6499
Vermeer, D M M (2019) Collective learning in strategic public private partnership procurement systems for social infrastructure. PhD thesis, University of London, University College London, UK.
Vermeer, Daniel Marinus Maria (2019) Collective learning in strategic public private partnership (PPP) procurement systems for social infrastructure. PhD thesis, University College London, UK.
Vitharana, V H P and Chinda, T (2021) Development of a lower back pain prevention index for heavy equipment operators in the construction industry: System dynamics modelling. International Journal of Construction Management, 21(7), pp. 677-693. ISSN 1562-3599
Vitiello, Umberto (2017) A sustainable framework for the optimization of retrofit strategies of existing buildings. PhD thesis, Università degli Studi di Napoli Federico II, Italy.
Volmink, P (2018) The treatment of non-responsive bids in South African public procurement law. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Walker, D H T; Harley, J and Mills, A (2015) Performance of project alliancing in Australasia: A digest of infrastructure development from 2008 to 2013. Construction Economics and Building, 15(1), pp. 1-18. ISSN 2204-9029
Walker, D H T and Wilson, A J (2004) The knowledge advantage (K-Adv) concept. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Walraven, A and de Vries, B (2009) From demand driven contractor selection towards value driven contractor selection. Construction Management and Economics, 27(6), pp. 597-604. ISSN 1466433X
Wamuziri, S (2010) Alternative models for procurement of major infrastructure projects in Scotland. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Wani, D (1997) Strategies to increase the degree of participation of local companies in construction projects in developing countries. PhD thesis, University of Leeds, UK.
Weiss, A P W (2006) Value for money: defining and measuring 'value' in MoD's acquisition policy of obtaining best value for money. PhD thesis, University College London, UK.
Wernicke, B; Stehn, L; Sezer, A A and Thunberg, M (2023) Introduction of a digital maturity assessment framework for construction site operations. International Journal of Construction Management, 23(5), pp. 898-908. ISSN 1562-3599
Wessels, M (2014) Stimulating sustainable infrastructure development through public-private partnerships. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 232-241. ISSN 17514304
Wibowo, A and Hartiati, D (2023) Value-for-money drivers in public-private partnerships in affordable housing in Indonesia: An analytic network process perspective. Journal of Construction in Developing Countries, 28(2), pp. 101-119. ISSN 1823-6499
Wibowo, A and Sundermeier, M (2020) Developing a fuzzy value-for-money analysis model for annuity-based public-private partnership infrastructure projects under consideration of risk mitigation capability. Journal of Construction Engineering and Management, 146(7): 04020081, ISSN 0733-9364
Williams, J; Fugar, F and Adinyira, E (2020) Assessment of health and safety culture maturity in the construction industry in developing economies: A case of Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(4), pp. 865-881. ISSN 1726-0531
Willis, C J (2010) Measuring the performance of the construction industry through the use of project performance benchmarking metrics in conjunction with maturity modeling. PhD thesis, University of New Brunswick, Canada.
Willis, C J and Rankin, J H (2010) Measuring the maturity of Guyana's construction industry using the construction industry macro maturity model. Journal of Construction in Developing Countries, 15(2), pp. 87-116. ISSN 1823-6499
Wilson, G (2013) An integrated decision support model for the sustainable refurbishment of hospitals and healthcare facilities: Developing a prototype. PhD thesis, Robert Gordon University, UK.
Wong, A K D and Zhang, R (2013) Implementation of web-based construction project management system in China projects by Hong Kong developers. Construction Innovation, 13(1), pp. 26-49. ISSN 1471-4175
Wood, G; Davis, P; Eadie, R; Perera, S and Heaney, G (2011) Key process area mapping in the production of an e-capability maturity model for UK construction organisations. Journal of Financial Management of Property and Construction, 16(3), pp. 197-210. ISSN 1366-4387
Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Xiong, W; Zhang, X and Chen, H (2016) Early-termination compensation in public-private partnership projects. Journal of Construction Engineering and Management, 142(4): 04015098, ISSN 0733-9364
Xu, Ming (2010) The value of critical project decisions: measurement and modelling. PhD thesis, University of Melbourne, Australia.
Yates, J K (2014) Design and construction for sustainable industrial construction. Journal of Construction Engineering and Management, 140(4): B4014005, ISSN 0733-9364
Yu, A T W; Javed, A A; Lam, T I; Shen, G Q and Sun, M (2018) Integrating value management into sustainable construction projects in Hong Kong. Engineering, Construction and Architectural Management, 25(11), pp. 1475-1500. ISSN 0969-9988
Yu, H; Peng, Z; He, Z and Huang, C (2024) Application maturity evaluation of building steel structure welding robotic technology based on multi-level gray theory. Engineering, Construction and Architectural Management, 31(11), pp. 4372-4397. ISSN 0969-9988
Yuan, J; Li, X; Ke, Y; Xu, W; Xu, Z and Skibniewski, M (2020) Developing a building information modeling-based performance management system for public-private partnerships. Engineering, Construction and Architectural Management, 27(8), pp. 1727-1762. ISSN 0969-9988
Yuan, J; Zeng, A Y; Skibniewski, M J and Li, Q (2009) Selection of performance objectives and key performance indicators in public-private partnership projects to achieve value for money. Construction Management and Economics, 27(3), pp. 253-270. ISSN 1466433X
Zahiroddiny, S (2016) Understanding the impact of building information modelling (BIM) on construction projects' communication patterns. PhD thesis, University of Northumbria at Newcastle, UK.
Zanni, M A (2017) Communication of sustainability information and assessment within BIM-enabled collaborative environment. PhD thesis, Loughborough University, UK.
Zawawi, M I b Z (2017) Improving competition within public private partnership (PPP) procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.
Zhang, J (2012) Developing a construction safety management and audit system. PhD thesis, National University of Singapore, Singapore.
Zhang, J; Chen, F and Yuan, X X (2020) Comparison of cost and schedule performance of large public projects under P3 and traditional delivery models: A Canadian study. Construction Management and Economics, 38(8), pp. 739-755. ISSN 01446193
Zhang, J and Yuan, X X (2021) Stochastic modelling of maintenance flexibility in value for money assessment of PPP road projects. Construction Management and Economics, 39(2), pp. 173-191. ISSN 01446193
Zhang, J; Zou, W and Kumaraswamy, M (2015) Developing public private people partnership (4P) for post disaster infrastructure procurement. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 468-484. ISSN 1759-5916
Zhang, X and Tariq, S (2020) Failure mechanisms in international water PPP projects: A public sector perspective. Journal of Construction Engineering and Management, 146(6): 04020055, ISSN 0733-9364
Zhao, J (2022) Rethinking value for money in Public Private Partnerships: a critique, analysis and model for transport infrastructure projects. PhD thesis, Northumbria University, UK.
Zhao, J; Thurairajah, N; Greenwood, D; Liu, H and Yuan, J (2023) Unpacking the context of value for money assessment in global markets: A procurement option framework for public-private partnerships. Engineering, Construction and Architectural Management, 30(8), pp. 3583-3601. ISSN 0969-9988
Zhao, X (2014) Enterprise risk management in Chinese construction firms operating overseas. PhD thesis, National University of Singapore, Singapore.
Zhao, X; Hwang, B G and Low, S P (2013) Developing fuzzy enterprise risk management maturity model for construction firms. Journal of Construction Engineering and Management, 139(9), pp. 1179-1189. ISSN 0733-9364
Zhao, X; Hwang, B-G and Low, S P (2016) An enterprise risk management knowledge-based decision support system for construction firms. Engineering, Construction and Architectural Management, 23(3), pp. 369-384. ISSN 0969-9988
Zin Zawawi, M I (2017) Improving competition within public private partnership procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.
Zou, P X W; Chen, Y and Chan, T Y (2010) Understanding and improving your risk management capability: Assessment model for construction organizations. Journal of Construction Engineering and Management, 136(8), pp. 854-863. ISSN 0733-9364
Zou, P X W; Wang, S and Fang, D (2008) A life-cycle risk management framework for PPP infrastructure projects. Journal of Financial Management of Property and Construction, 13(2), pp. 123-142. ISSN 1366-4387
Zou, W (2012) Relationship management in public private partnership infrastructure projects. PhD thesis, University of Hong Kong, Hong Kong.
Up a level