Adebowale, O J (2018) A multi-stakeholder approach to productivity improvement in the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.

Alharbi, E A and Alsehaimi, A (2025) Machine learning model to predict the cooling load of mosque buildings during the design stage. International Journal of Construction Management, 25(8), pp. 965-979. ISSN 1562-3599

Alhashedi, E; Zhang, H and Lin, Y (2026) Adaptive estimation and management of cost contingencies in EPC projects. Journal of Construction Engineering and Management, 152(5): 04026056, ISSN 0733-9364

Alqahtani, A and Whyte, A (2013) Artificial neural networks incorporating cost significant items towards enhancing estimation for (life-cycle) costing of construction projects. Construction Economics and Building, 13(3), pp. 51-64. ISSN 2204-9029

Amadi, A I and Higham, A (2017) Latent geotechnical pathogens inducing cost overruns in highway projects. Journal of Financial Management of Property and Construction, 22(3), pp. 269-285. ISSN 1366-4387

Arashida, R. and Horita, M. (2026) A data-driven framework for causal modeling of design change propagation in civil infrastructure. Journal of Construction Engineering and Management, 152(10): 04026158, ISSN 0733-9364

Atin, A (2016) Project risk propagation modeling of engineering, procurement and construction. PhD thesis, Wayne State University, USA.

Awad, A and Fayek, A R (2013) Adaptive learning of contractor default prediction model for surety bonding. Journal of Construction Engineering and Management, 139(6), pp. 694-704. ISSN 0733-9364

Awad, A L S (2012) Intelligent contractor default prediction model for surety bonding in the construction industry. PhD thesis, University of Alberta, Canada.

Aziz, Hayder (2007) A methodology for the distributed and collaborative management of engineering knowledge. PhD thesis, Cranfield University, UK.

Bai, L; Zhao, X; Kang, S; Ma, Y and Zhang, B (2025) Dynamic assessment of stakeholder conflict risk for R&D project portfolios. Engineering, Construction and Architectural Management, 32(4), pp. 2342-2368. ISSN 0969-9988

Bakis, N (2009) Product data sharing in architecture, engineering and construction: Assessment of middleware support and business benefits. PhD thesis, University of Salford, UK.

Bala, K; Bustani, S A and Waziri, B S (2014) A computer-based cost prediction model for institutional building projects in Nigeria: An artificial neural network approach. Journal of Engineering, Design and Technology, 12(4), pp. 519-530.

Bartlett, A I (2018) Auto-extinction of engineered timber. PhD thesis, University of Edinburgh, UK.

Bendi, D; Rana, M Q; Arif, M; Goulding, J S and Kaushik, A K (2021) Understanding off-site readiness in Indian construction organisations. Construction Innovation, 21(1), pp. 105-122. ISSN 1471-4175

Bhaurkar, V P and Thakur, A G (2019) Investigation of crack in beams using anti-resonance technique and FEA approach. Journal of Engineering, Design and Technology, 17(6), pp. 1266-1284. ISSN 1726-0531

Bhokha, S and Ogunlana, S O (1999) Application of artificial neural network to forecast construction duration of buildings at the pre-design stage. Engineering, Construction and Architectural Management, 6(2), pp. 133-144. ISSN 0969-9988

Binsarra, F A (2016) Uncovering the structure and the dynamic of information propagation in building. PhD thesis, University of Liverpool, UK.

Boukamp, F (2006) Modeling of and reasoning about construction specifications to support automated defect detection. PhD thesis, Carnegie Mellon University, USA.

Brito, Luiz Antonio Perrone Ferreira de (2006) Corrections in the determination of the sound power level obtained through intensimetry technique. PhD thesis, Universidade Estadual de Campinas, Brazil.

Castelblanco, G; Fenoaltea, E M; De Marco, A and Chiaia, B (2025) Influence of macroeconomic factors on construction costs: An analysis of project cases. Construction Management and Economics, 43(3), pp. 196-212. ISSN 0144-6193

Castelblanco, G; Fenoaltea, E M; De Marco, A; Demagistris, P; Petruzzi, S and Zeppegno, D (2024) Combining stakeholder and risk management: Multilayer network analysis for complex megaprojects. Journal of Construction Engineering and Management, 150(2): 04023161, ISSN 0733-9364

Chandra, Shailja (2006) Investigating green building assessment tools: a risk-analysis based approach. PhD thesis, University of New South Wales, Australia.

Chao, L C and Skibniewski, M J (1995) Neural network method of estimating construction technology acceptability. Journal of Construction Engineering and Management, 121(1), pp. 130-142. ISSN 0733-9364

Chen, J-H (2003) Litigation prediction model for construction disputes caused by change orders. PhD thesis, University of Wisconsin - Madison, USA.

Chen, L and Whyte, J (2022) Understanding design change propagation in complex engineering systems using a digital twin and design structure matrix. Engineering, Construction and Architectural Management, 29(8), pp. 2950-2975. ISSN 0969-9988

Chen, W T and Huang, Y H (2006) Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Construction Management and Economics, 24(12), pp. 1231-1239. ISSN 1466433X

Cheng, F and Yin, Y (2024) Organizational antecedents and multiple paths of knowledge-sharing behavior of construction project members: Evidence from Chinese construction enterprises. Engineering, Construction and Architectural Management, 31(3), pp. 957-975. ISSN 0969-9988

Choudhary, R and Tian, W (2014) Influence of district features on energy consumption in non-domestic buildings. Building Research & Information, 42(1), pp. 32-46. ISSN 0961-3218

Din, Z U and Bernold, L E (2017) Experimental study of signal behavior for wireless communication in construction. Construction Innovation, 17(4), pp. 475-491. ISSN 1471-4175

Duksh, Y S; Kaushik, B K; Sarkar, S and Singh, R (2010) Performance comparison of carbon nanotube, nickel silicide nanowire and copper vlsi interconnects: Perspectives and challenges ahead. Journal of Engineering, Design and Technology, 8(3), pp. 334-353. ISSN 1726-0531

Duksh, Y S; Kaushik, B K; Sarkar, S and Singh, R (2013) Analysis of propagation delay and power with variation in driver size and number of shells in multi walled carbon nanotube interconnects. Journal of Engineering, Design and Technology, 11(1), pp. 19-33. ISSN 1726-0531

Duong, A T B; Pham, T; Truong Quang, H; Hoang, T G; McDonald, S; Hoang, T H and Pham, H T (2023) Ripple effect of disruptions on performance in supply chains: An empirical study. Engineering, Construction and Architectural Management, 31(13), pp. 1-22. ISSN 0969-9988

Elhag, T M S and Boussabaine, A H (1998) An artificial neural system for cost estimation of construction projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Elnady, Ahmed Abdelrady Okasha Mohamed (2023) An integrated framework for balancing contractor's workload versus capacity using system dynamics. PhD thesis, University of Alberta, Canada.

Entner, D; Prante, T; Vosgien, T; Zăvoianu, A C; Saminger-Platz, S; Schwarz, M and Fink, K (2019) Potential identification and industrial evaluation of an integrated design automation workflow. Journal of Engineering, Design and Technology, 17(6), pp. 1085-1109. ISSN 1726-0531

Erpen, Mauro Luiz (2020) Analysis of the perception of relative importance of critical success factors in the civil construction industry using artificial neural networks. PhD thesis, Universidade de Brasília, Brazil.

Garthwaite, P M and Eckert, C M (2012) Glitches, snags and crises: A study of change in two hospital adaptation projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Ghanbarpour, S; Mazaheripour, H; Mirmoradi, S H and Barari, A (2010) The effect of type and volume fraction (vf) of steel fiber on the mechanical properties of self-compacting concrete. Journal of Engineering, Design and Technology, 8(3), pp. 247-256. ISSN 1726-0531

Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.

Guan, Li (2022) An integrated decision support system for project risk assessment and treatment decision making considering risk interdependencies. PhD thesis, University of New South Wales, Australia.

Hadipriono, F C; Lim, C L and Wong, K H (1986) Event tree analysis to prevent failures in temporary structures. Journal of Construction Engineering and Management, 112(4), pp. 500-513. ISSN 0733-9364

Hamoda, M F (2008) Modeling of construction noise for environmental impact assessment. Journal of Construction in Developing Countries, 13(1), pp. 79-89. ISSN 1823-6499

Han, R; Li, X; Shen, Z and Jia, D (2024) A framework of robust project portfolio selection problem under strategic objectives considering the risk propagation. Engineering, Construction and Architectural Management, 31(12), pp. 4872-4896. ISSN 0969-9988

Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364

Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364

Hassanein, A A G and El Nemr, W (2008) Claims management in the Egyptian industrial construction sector: A contractor's perspective. Engineering, Construction and Architectural Management, 15(3), pp. 246-259. ISSN 0969-9988

Hymes, S J (2010) Front end specifications and the propagation of construction claims. DSc thesis, Washington University in St. Louis, USA.

Islam, M M and Mohamed, S (2009) Bid-winning potential optimization for concession schemes with imprecise investment parameters. Journal of Construction Engineering and Management, 135(8), pp. 690-700. ISSN 0733-9364

Jadidoleslami, S. and Saghatforoush, E. (2026) Unveiling interdependencies across phases: MICMAC analysis of BIM and AI integration challenges in construction. Architectural Engineering and Design Management, 22(4), pp. 1188-1210. ISSN 1745-2007

Jha, K N and Chockalingam, C T (2011) Prediction of schedule performance of Indian construction projects using an artificial neural network. Construction Management and Economics, 29(9), pp. 901-911. ISSN 1466433X

Jiang, Q (2020) Estimation of construction project building cost by back-propagation neural network. Journal of Engineering, Design and Technology, 18(3), pp. 601-609. ISSN 1726-0531

Ju, Q; Dai, Y; Liu, H and Shen, Z (2026) Interface management of complex capital projects from the perspective of interface clusters: Using complex networks and spectral clustering methods. Journal of Construction Engineering and Management, 152(2): 04025257, ISSN 0733-9364

Kang, K (2018) Enhancing critical capacity of infrastructure supply chain to improve resilience of associated communities and infrastructure to disaster. PhD thesis, Purdue University, USA.

Kere, K J (2023) Probabilistic model development and risk management strategies for pipelines with anomalies. PhD thesis, Marquette University, USA.

Kong, J S (2001) Lifetime maintenance strategies for deteriorating structures. PhD thesis, University of Colorado at Boulder, USA.

Koo, K-J (2000) Organizational program management for multiple maintenance projects under multi-trade capacity constraints. PhD thesis, University of Wisconsin - Madison, USA.

Koskela, L (2003) Is structural change the primary solution to the problems of construction? Building Research & Information, 31(2), pp. 85-96. ISSN 0961-3218

Kumar, S D; Kumar, K B and Sharma, R K (2014) Delay model for dynamically switching coupled on-chip interconnects. Journal of Engineering, Design and Technology, 12(3), pp. 364-373.

Li, C (2023) Efficient and accurate assessment of fire spread over external claddings in high-rise buildings. PhD thesis, University of Manchester, UK.

Liu, W.; Luo, X.; Feng, Z.; Liang, B. and Fan, G. (2026) Research on risk propagation mechanism and control strategy of prefabricated building supply chain: Based on complex network model and dynamic simulation analysis. Engineering, Construction and Architectural Management, 33(7), pp. 5901-5933. ISSN 0969-9988

Lowe, D J; Parvar, J and Emsley, M W (2004) Development of a decision support system (DSS) for the contractor's decision to bid: Regression analysis and neural networks solutions. Journal of Financial Management of Property and Construction, 9(1), pp. 27-42. ISSN 1366-4387

Ludlow, J E (1976) Assessment and prediction of noise from construction sites. PhD thesis, University of Southampton, UK.

Luo, Q.; Sun, C.; Li, G.; Li, Y.; Xue, J. and Zhang, G. (2026) Hierarchical schedule risk structures and mitigation strategies in prefabricated building projects: An integrated SNA-ISM approach. Engineering, Construction and Architectural Management, 33(7), pp. 5737-5759. ISSN 0969-9988

Marmanillo, O Z (2021) Study of lean and complex adaptive mechanism to regulate the function of production planning and control in construction projects. PhD thesis, Pontificia Universidad Catolica de Chile, Chile.

Mdibi, L; Van Zyl, R; Kosch, M and Ward, J (2021) A land-based hf transmitter for ionospheric propagation studies using superdarn radars. Journal of Engineering, Design and Technology, 19(6), pp. 1648-1659. ISSN 1726-0531

Meng, Q; Zhu, J; Li, Z and Chong, H Y (2024) Clarifying unsafe behaviors of construction workers through a complex network of unsafe behavior chains. Journal of Construction Engineering and Management, 150(11): 04024164, ISSN 0733-9364

Mokhtar, A H M (2002) Coordinating and customizing design information through the internet. Engineering, Construction and Architectural Management, 9(3), pp. 222-231. ISSN 0969-9988

Moore, H (2013) Exploring information generation and propagation from the point of installation on construction jobsites: An sna/abm hybrid approach. PhD thesis, Michigan State University, USA.

Mostafavi, A (2013) Ex-ante assessment of financial innovation policies in infrastructure system-of-systems. PhD thesis, Purdue University, USA.

Mulowayi, E; Coffey, V; Bunker, J and Trigunarsiah, B (2015) The influence of critical infrastructure interdependencies on post-disaster reconstruction: Elements of infrastructure interdependency that impede the post-disaster recovery effort. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ogunlana, S O; Bhokha, S and Pinnemitr, N (2001) Application of artifical neural network (ANN) to forecast construction cost of buildings at the pre-design stage. Journal of Financial Management of Property and Construction, 6(3), pp. 179-192. ISSN 1366-4387

Ongkowijoyo, C and Doloi, H (2017) Determining critical infrastructure risks using social network analysis. International Journal of Disaster Resilience in the Built Environment, 8(1), pp. 5-26. ISSN 1759-5916

Ongkowijoyo, C S; Doloi, H and Mills, A (2019) Participatory-based risk impact propagation and interaction pattern analysis using social network analysis. International Journal of Disaster Resilience in the Built Environment, 10(5), pp. 363-378. ISSN 1759-5916

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Padala, S P S and Maheswari, J U (2023) Modeling a construction project in a matrix-based framework for managing requirement changes. International Journal of Construction Management, 23(14), pp. 2369-2390. ISSN 1562-3599

Pakkala, T A; Köliö, A; Lahdensivu, J and Pentti, M (2019) Predicted corrosion rate on outdoor exposed concrete structures. International Journal of Building Pathology and Adaptation, 37(5), pp. 679-698. ISSN 23984708

Palencia, M; Mora, M and Lerma, T A (2021) Environment-friendly stimulus-sensitive polyurethanes based on cationic aminoglycosides for the controlled release of phytohormones. Smart and Sustainable Built Environment, 10(1), pp. 1-17. ISSN 2046-6099

Patel, D A and Jha, K N (2015) Neural network model for the prediction of safe work behavior in construction projects. Journal of Construction Engineering and Management, 141(1): 04014066, ISSN 0733-9364

Poh, Y P and Tah, J H M (2006) Integrated duration-cost influence network for modelling risk impacts on construction tasks. Construction Management and Economics, 24(8), pp. 861-868. ISSN 1466433X

Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364

Ramadan, R; Ghanem, H; Khatib, J M and ElKordi, A M (2025) Effect of plant-based natural fibers on the mechanical properties and volume change of cement paste. International Journal of Building Pathology and Adaptation, 43(4), pp. 693-711. ISSN 2398-4708

Rashidi, A; Jazebi, F and Brilakis, I (2011) Neurofuzzy genetic system for selection of construction project managers. Journal of Construction Engineering and Management, 137(1), pp. 17-29. ISSN 0733-9364

Rathi, R N; Tulasi Devi, S L and Rajamalla, A P (2025) Evaluating the impact of lockdowns and interest rate cuts on construction stock price returns: A did approach. International Journal of Construction Management, 25(16), pp. 2051-2062. ISSN 1562-3599

Saleem, M (2024) Internal damage detection in reinforced concrete member using ultrasonic pulse velocity nondestructive testing. Journal of Construction Engineering and Management, 150(8): 04024084, ISSN 0733-9364

Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.

Sanna, F (2018) Timber modern methods of construction: a comparative study. PhD thesis, Edinburgh Napier University, UK.

Savaşkan, M O and Özener, O Ö (2023) H-BIM applications for vernacular architecture: A historic rural house case study in bursa, Turkey. Engineering, Construction and Architectural Management, 30(9), pp. 3997-4017. ISSN 0969-9988

Schmidt Iii, R; Vibaek, K S and Austin, S (2014) Evaluating the adaptability of an industrialized building using dependency structure matrices. Construction Management and Economics, 32(1-2), pp. 160-182. ISSN 01446193

Sharma, D K; Kaushik, B K and Sharma, R K (2014) Impact of driver size and interwire parasitics on crosstalk noise and delay. Journal of Engineering, Design and Technology, 12(4), pp. 475-490.

Soemardi, B W (1993) Fuzzy neural network models for design/construction processes. PhD thesis, University of Kentucky, USA.

Soliman, E M (2005) Delay hierarchy propagation model. PhD thesis, University of Plymouth, UK.

Soliman, M (2015) Life-cycle management of civil and marine structures under fatigue and corrosion effects. PhD thesis, Lehigh University, USA.

Struck, C (2012) Uncertainty propagation and sensitivity analysis techniques in building performance simulation to support conceptual building and system design. PhD thesis, Eindhoven University of Technology, Netherlands.

Swaffield, J A (2005) Transient identification of defective trap seals. Building Research & Information, 33(3), pp. 245-256. ISSN 0961-3218

Swaffield, J A and Jack, L B (2004) Simulation and analysis of airborne cross-contamination routes due to the operation of building drainage and vent systems. Building Research & Information, 32(6), pp. 451-467. ISSN 0961-3218

Tanratanawong, S and Scott, S (2000) A neural network model to forecast national construction output. Journal of Financial Management of Property and Construction, 5(1-2), pp. 65-77. ISSN 1366-4387

Teo, S I E; Zhou, Y and Yeoh, J K W (2025) Indoor wifi path loss model to estimate indoor network coverage considering residential design. Smart and Sustainable Built Environment, 14(5), pp. 1407-1433. ISSN 2046-6099

Teo, E A L and Harikrishna, N (2006) A quantitative model for efficient maintenance of plastered and painted façades. Construction Management and Economics, 24(12), pp. 1283-1293. ISSN 1466433X

Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.

Verma, S K and Kaushik, B K (2015) Bus encoder design for crosstalk and power reduction in rlc modelled vlsi interconnects. Journal of Engineering, Design and Technology, 13(3), pp. 486-498.

Wan, M.; Li, L.; Yuan, M. and Yin, X. (2026) Modeling stakeholder-associated risk networks in the life cycle of building-integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(7), pp. 5469-5494. ISSN 0969-9988

Wang, S; Zhu, S and Yuen, P L (2021) Assessment of ground-borne vibration impact on nearby underground facilities induced by ground surface excavation. Journal of Construction Engineering and Management, 147(7): 04021071, ISSN 0733-9364

Wang, Zhichen (2025) Framework for automated change propagation from building information models to building energy models. PhD thesis, Carnegie Mellon University, USA.

Wanous, M; Boussabaine, H A and Lewis, J (2003) A neural network bid/no bid model: The case for contractors in Syria. Construction Management and Economics, 21(7), pp. 737-744. ISSN 01446193

Warrier, G A and Palaniappan, S (2025) Uncertainty in the embodied energy assessment of buildings: a case of EWS type low-cost house in India. International Journal of Construction Management, 25(8), pp. 911-922. ISSN 1562-3599

Wijetunge, J (2010) Assessment of potential tsunamigenic seismic hazard to Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 207-220. ISSN 1759-5916

Wijetunge, J J (2020) A multi-scenario assessment of the seismogenic tsunami hazard for Bangladesh. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 156-168. ISSN 1759-5916

Williams, T P (1994) Predicting changes in construction cost indexes using neural networks. Journal of Construction Engineering and Management, 120(2), pp. 306-320. ISSN 0733-9364

Wong, A K D and Zhang, R (2013) Implementation of web-based construction project management system in China projects by Hong Kong developers. Construction Innovation, 13(1), pp. 26-49. ISSN 1471-4175

Xia, Y (2020) Research on dynamic data monitoring of steel structure building information using BIM. Journal of Engineering, Design and Technology, 18(5), pp. 1165-1173. ISSN 1726-0531

Yan, J (2020) 3D printing optimization algorithm based on back-propagation neural network. Journal of Engineering, Design and Technology, 18(5), pp. 1223-1230. ISSN 1726-0531

Yeh, I C (1998) Quantity estimating of building with logarithm-neuron networks. Journal of Construction Engineering and Management, 124(5), pp. 374-380. ISSN 0733-9364

Zhang, H and Alhashedi, E (2025) Propagation analysis and assessment for the risks in EPC projects. Journal of Construction Engineering and Management, 151(12): 04025209, ISSN 0733-9364

al Nageim, H; Nagar, R and Lisboa, P J G (2007) Comparison of neural network and binary logistic regression methods in conceptual design of tall steel buildings. Construction Innovation, 7(3), pp. 240-253. ISSN 1471-4175