Items with Subject: engineering problems
Abu Alieh, L; Hosseini, M R; Martek, I; Wu, W and Arashpour, M (2025) Bridging the gap: assessing the person-organization fit between BIM education and industry expectations in Australia. Engineering, Construction and Architectural Management, 32(6), pp. 3760-3778. ISSN 0969-9988
Adegoke, A.; Akanmu, A. and Terreno, S. (2026) Aligning visual data practices with construction decision making: Delphi-based investigation. Journal of Construction Engineering and Management, 152(8): 04026119, ISSN 0733-9364
Agee, P; Gao, X; Paige, F; McCoy, A and Kleiner, B (2021) A human-centred approach to smart housing. Building Research & Information, 49(1), pp. 84-99. ISSN 0961-3218
Ahlström, E (2024) The dominant divide: Innovation in project-based organisations. PhD thesis, Uppsala Universitet, Sweden.
Ainoo, F N Y (2025) Leveraging big data in AEC decision-making: A governance framework. PhD thesis, Capella University, USA.
Al Mousli, M H and El-Sayegh, S M (2016) Assessment of the design-construction interface problems in the UAE. Architectural Engineering and Design Management, 12(5), pp. 353-366. ISSN 1745-2007
Al-Nabhani, S (2012) Graduate recruitment in Oman's private construction industry. PhD thesis, University of Salford, UK.
Alam, Sadaf (2024) Development of the framework and the methodologies towards nzebs in Finland. PhD thesis, Aalto University, Finland.
Alameri, H (2018) A resource-based perspective of project success in public sector projects in Abu Dhabi. PhD thesis, Bournemouth University, UK.
Alaux, N; Kulmer, V; Vogel, J and Passer, A (2025) Preserving buildings: Emission reductions from circular economy strategies in Austria. Buildings & Cities, 6(1), pp. 881-898. ISSN 2632-6655
Alencastro, J; Fuertes, A and de Wilde, P (2016) Improving the quality management systems for energy-efficient social housing projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Alshebli, A (2016) Improving capabilities and strategic fit in governmental agencies: The case of Abu Dhabi government infrastructure sector. PhD thesis, University of Wolverhampton, UK.
Ardeshiri, A; Vij, A and Arthur, N (2026) Attracting young women to construction careers: A preference study to inform workforce strategies. Construction Management and Economics, 44(3), pp. 214-239. ISSN 0144-6193
Awuzie, B and McDermott, P (2016) A systems approach to assessing organisational viability in project-based organisations. Built Environment Project and Asset Management, 6(3), pp. 268-283. ISSN 2044-124X
Badi, S (2024) The role of blockchain in enabling inter-organisational supply chain alignment for value co-creation in the construction industry. Construction Management and Economics, 42(3), pp. 266-288. ISSN 01446193
Badi, Sulafa M (2012) Sustainable energy innovation (SEI) within private finance initiative (PFI) projects. PhD thesis, University College London, UK.
Bai, W.; Wang, J. and Yu, X. (2026) Spatiotemporal characteristics and obstacle factors of coupling coordination degree between the digital economy and the high-quality development of the construction industry: Evidence from China. Engineering, Construction and Architectural Management, 33(7), pp. 5125-5154. ISSN 0969-9988
Barthel, P-A (2016) Morocco in the era of eco-urbanism: Building a critical and operational research on an emerging practice in Africa. Smart and Sustainable Built Environment, 5(3), pp. 272-288. ISSN 2046-6099
Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099
Berghauser Pont, M; Haupt, P; Berg, P; Alstäde, V and Heyman, A (2021) Systematic review and comparison of densification effects and planning motivations. Buildings & Cities, 2(1), pp. 378-401. ISSN 2632-6655
Bittner, Ksenia (2020) Building information extraction and refinement from vhr satellite imagery using deep learning techniques. PhD thesis, Osnabrück University, Germany.
Borg, J (2020) Work readiness of project management graduates in construction: a multi-method multi-vocal qualitative study. PhD thesis, RMIT University, Australia.
Borg Axisa, G and Borg, R P (2024) Climate change adaptation in Malta: Assessment of skills in the built environment. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 668-679. ISSN 1759-5916
Bouwer, K A (2016) Building disappointment: the limits and potential of tort liability for energy efficiency problems in domestic buildings. PhD thesis, University College London, UK.
Bowen, P; Jay, I; Cattell, K and Edwards, P (2010) Value management awareness and practice by South African architects: An empirical study. Construction Innovation, 10(2), pp. 203-222. ISSN 1471-4175
Bryde, D J (2000) Project management: uses, structures, systems and influences. PhD thesis, Liverpool John Moores University, UK.
Bulsara, M A; Hingu, A D and Vaghasiya, P S (2016) Energy loss due to unbalance in rotor–shaft system. Journal of Engineering, Design and Technology, 14(2), pp. 277-285.
Caballero-Güereca, C E; Vogel, J; Alaux, N; Ouellet-Plamondon, C M; Santana, J S; Foliente, G; Lützkendorf, T and Passer, A (2026) Towards net zero: Sectoral ambitions and global trends in building decarbonisation. Buildings & Cities, 7(1), pp. 396-424. ISSN 2632-6655
Callaghan, N (2014) House buyers and builders: The "ideal" home in Scotland. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Carpino, C; Loukou, E; Heiselberg, P and Arcuri, N (2020) Energy performance gap of a nearly zero energy building (nZEB) in Denmark: The influence of occupancy modelling. Building Research & Information, 48(8), pp. 899-921. ISSN 0961-3218
Castelblanco, G; Fenoaltea, E M; De Marco, A; Demagistris, P; Petruzzi, S and Zeppegno, D (2024) Combining stakeholder and risk management: Multilayer network analysis for complex megaprojects. Journal of Construction Engineering and Management, 150(2): 04023161, ISSN 0733-9364
Chan, C T W and Pasquire, C (2002) Estimation of project overheads: A contractor’s perspective. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Chan, M-W (1997) The relationship between project funding and construction systems. PhD thesis, University of Hong Kong, Hong Kong.
Chan, Y M T (2008) The role of finance in competitiveness of indigenous contractors in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chen, Qian (2020) A systematic approach to enabling digital supply chain coordination in construction projects. PhD thesis, ETH Zürich, Switzerland.
Cheung, Yan Ki Fiona (2011) Relationship management as a strategy for supply chain engagement in the civil engineering construction industry. PhD thesis, Queensland University of Technology, Australia.
Chritamara, S and Ogunlana, S O (2001) Problems experienced on design and build projects in Thailand. Journal of Construction Procurement, 7(1), pp. 73-93. ISSN 1358-9180
Dave, Malay (2019) High performance prefab housing: towards an evaluation framework for design, sustainability and affordability. PhD thesis, University of New South Wales, Australia.
De Neyra, P L A and Celoza, A (2026) Identifying influential factors in end-of-life decision-making for buildings using the Delphi method. Journal of Construction Engineering and Management, 152(4): 04026015, ISSN 0733-9364
Devapriya, K A K and Khu, F L (2004) Bond financing in private infrastructure projects in developing countries. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Dhaenens, A; Zheng, W; Sanders, K and Sumelius, J (2026) Mind the gap: Employee work arrangements, work-family balance satisfaction, and turnover in international property development. Journal of Construction Engineering and Management, 152(1): 04025231, ISSN 0733-9364
Dixon, T J (1994) An analysis of IT skills training and education in the surveying profession. PhD thesis, University of Reading, UK.
Eikelenboom, M; van Uden, M; Coenen, T B J and Vosman, L (2025) Strategic programmes for circular construction: Lessons from three public clients. Construction Management and Economics, 43(11), pp. 901-921. ISSN 0144-6193
Ejohwomu, O A; Proverbs, D G and Olomolaiye, P (2005) A conceptual demand led model founded on theories of labour market mismatch for the construction and building services industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Elmahroug, M H; Tutesigensi, A and Brookes, N J (2014) Integrating external stakeholder identification and project initiation in civil engineering infrastructure projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Elmahroug, M H M (2018) Facilitating effective external stakeholder involvement in the pre-design phase of civil engineering infrastructure projects. PhD thesis, University of Leeds, UK.
Ene, G U; Goulding, J S and John, G A (2016) Sustainable human capacity development in the African built environment: How far is the journey to a knowledge society? Smart and Sustainable Built Environment, 5(3), pp. 212-231. ISSN 2046-6099
Enshassi, A; Arain, F and Tayeh, B (2012) Major causes of problems between contractors and subcontractors in the Gaza Strip. Journal of Financial Management of Property and Construction, 17(1), pp. 92-112. ISSN 1366-4387
Federle, M O; Rowings, J E and Devany, T S (1993) Model of career choice for craftworkers. Journal of Construction Engineering and Management, 119(1), pp. 105-114. ISSN 0733-9364
Fischer, M A (1991) Using construction knowledge during preliminary design of reinforced concrete structures. PhD thesis, Stanford University, USA.
Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.
Fuentes, M E G (2019) Co-creation and co-destruction of experiential value: A service perspective in projects. Built Environment Project and Asset Management, 9(1), pp. 100-117. ISSN 2044-124X
Fuentes-Del-Burgo, J and Navarro-Astor, E (2016) What is engineering education for? Listening to the voices of some Spanish building engineers. Journal of Engineering, Design and Technology, 14(4), pp. 897-919.
Fuentes-del-Burgo J, N-A E (2013) Do educational mismatches influence job satisfaction? In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Gajaba, P A P Y and Dissanayake, D M P P (2025) Barriers to implement energy efficiency strategies to heating, ventilation, air conditioning of airside system in commercial buildings in Sri Lanka. International Journal of Construction Management, 25(12), pp. 1395-1403. ISSN 1562-3599
GhaffarianHoseini, A; Tookey, J; GhaffarianHoseini, A; Naismith, N and Rotimi, J O B (2016) Integrating alternative technologies to improve built environment sustainability in Africa: Nexus of energy and water. Smart and Sustainable Built Environment, 5(3), pp. 193-211. ISSN 2046-6099
Gluch, P and Räisänen, C (2009) Interactional perspective on environmental communication in construction projects. Building Research & Information, 37(2), pp. 164-175. ISSN 0961-3218
Goins, J and Moezzi, M (2013) Linking occupant complaints to building performance. Building Research & Information, 41(3), pp. 361-372. ISSN 0961-3218
Goldwyn, B (2022) Drawing from local, multi-hazard safety perceptions and engineering assessments for safer housing. PhD thesis, University of Colorado at Boulder, USA.
Gonzalez, Alvaro Eduardo (2016) Organisational design & mirroring in construction. MPhil thesis, University of Sydney, Australia.
Goulding, J; Aouad, G and Nadim, W (2007) The nD-based computer game: Engaging school children in the construction design process. Architectural Engineering and Design Management, 3(4), pp. 222-237. ISSN 1745-2007
Griffith, A F (1997) Team alignment during pre-project planning of capital facilities. PhD thesis, University of Texas at Austin, USA.
Guo, Z; Xu, X; Gao, X; Xu, Y; Liu, J; Zhang, M and Li, F (2025) Enhanced risk-based quality control for hydraulic engineering construction projects considering the risk-influencing mechanism. Journal of Construction Engineering and Management, 151(2): 04024204, ISSN 0733-9364
Habibnezhad, M (2019) The impact of extreme virtual elevation above grade on construction workers' physiological responses, physical responses, and task performance. PhD thesis, University of Nebraska - Lincoln, USA.
Hinsberg, K L (2025) Crisis and governance communication for construction safety. PhD thesis, Arizona State University, USA.
Hopkin, T; Lu, S L; Rogers, P and Sexton, M (2016) A soft systems methodology approach to the improvement of a housing association. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Igo, T and Skitmore, M (2006) Diagnosing the organizational culture of an Australian engineering consultancy using the competing values framework. Construction Innovation, 6(2), pp. 121-139. ISSN 1471-4175
Jafari, K G; Nozhat Sadat Ghazi, S and Noorzai, E (2021) BIM-based integrated solution for analysis and management of mismatches during construction. Journal of Engineering, Design and Technology, 19(1), pp. 81-102. ISSN 1726-0531
Jiang, Ziang (2025) Advancing scan-vs-bim in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.
Jiang, Ziang (2025) Advancing scan-vs-BIM in progress monitoring of infrastructure construction. PhD thesis, University of New South Wales, Australia.
Jonsson, H (2018) Production strategy in project based production within a house-building context. PhD thesis, Linköping University, Sweden.
Jonsson, H and Rudberg, M (2015) Production system classification matrix: Matching product standardization and production-system design. Journal of Construction Engineering and Management, 141(6): 05015004, ISSN 0733-9364
Ju, J.; Liu, X.; Xu, F.; Cao, B.; Chen, W.; Wang, X. and Tian, G. (2026) Operational phase recognition and power matching under shoveling conditions in an autonomous loading mobile concrete mixer. Journal of Construction Engineering and Management, 152(9): 04026131, ISSN 0733-9364
Jumat, A R; Coffey, V and Skitmore, M (2012) Stakeholder service delivery expectations of military facilities management. Built Environment Project and Asset Management, 2(2), pp. 146-166. ISSN 2044-124X
Jørgensen, B; Emmitt, S and Bonke, S (2004) Studying cultural issues: The implementation of facilitated process-orientated cooperation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kabiri, S; Hughes, W P and Schweber, L (2014) Role conflict in project team dynamics. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Kanninen, V; Ryöppy, S; Lähtinen, K and Toppinen, A (2024) Actor perceptions and network characteristics around climate-wise housing and construction in Finland. Building Research & Information, 52(8), pp. 941-956. ISSN 0961-3218
Karamitsos, I (2020) Examination of the relationship between organisational and facility management strategy and value added. PhD thesis, University of Salford, UK.
Koh, T Y (2010) The effects of social capital on construction project success: exploring the mediating role of projectlearning. PhD thesis, University of Hong Kong, Hong Kong.
Kwawu, W E K and Hughes, W P (2008) Strategies for aligning organizational incentive systems through contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Lahouti, A (2017) Cue-based decision-making in construction work crews: An agent-based modeling approach. PhD thesis, Michigan State University, USA.
Lester, D and Torero, J (2019) Using megaproject performance outcomes to enhance decision-making behaviors in civil engineering graduates. Construction Economics and Building, 19(1), pp. 96-110. ISSN 2204-9029
Lim, Soon Kam (2009) Framework and processes for enhancing sustainability deliverables in Australian road infrastructure projects. PhD thesis, Queensland University of Technology, Australia.
Litchfield, K I (2014) Characterizing and understanding the growing population of socially engaged engineers through engineers without borders-USA. PhD thesis, University of Colorado at Boulder, USA.
Lulyalya, L P; Kikwasi, G J and Sospeter, N G (2026) Adequacy of contractor's financial capability weighing criteria in Tanzania construction projects: A quadratic and gap analysis. Journal of Engineering, Design and Technology, 24(1), pp. 24-44. ISSN 1726-0531
Lundberg, O; Nylén, D and Sandberg, J (2022) Unpacking construction site digitalization: The role of incongruence and inconsistency in technological frames. Construction Management and Economics, 40(11-12), pp. 987-1002. ISSN 01446193
Ly, Reachsak (2025) Leveraging artificial intelligence and distributed ledger technologies toward smart and autonomous buildings. PhD thesis, Virginia Tech, USA.
Löwstedt, M and Sandberg, R (2020) Standardizing the free and independent professional: The case of construction site managers in Sweden. Engineering, Construction and Architectural Management, 27(6), pp. 1337-1355. ISSN 0969-9988
Malakhatka, E; Shafqat, O; Sandoff, A and Thuvander, L (2025) Positive energy districts and energy communities: How living labs create value. Buildings & Cities, 6(1), pp. 783-799. ISSN 2632-6655
Mamun, M T (2021) Development of a governance framework for delivery of collaborative and security-minded BIM projects. PhD thesis, University of Salford, UK.
Manoj, G and Shivaji, C Y (2010) Design interface management of airport projects. International Journal of Construction Management, 10(3), pp. 29-44. ISSN 1562-3599
Marzuki, P; Oktavianus, A; Regina, A and Hasiholan, B (2019) Interface problems in change order-challenged projects. Journal of Construction in Developing Countries, 24(2), pp. 1-22. ISSN 1823-6499
Masrom, M D A; Skitmore, M and Bridge, A (2013) Determinants of contractor satisfaction. Construction Management and Economics, 31(7), pp. 761-779. ISSN 1466433X
McCarney, M P (2017) Interface management of offsite bathroom construction: process- and people-factors. PhD thesis, Loughborough University, UK.
Mkandawire, K; Kabiri, S; Mbugua, L and Connaughton, J (2022) Managing interfaces between offsite and onsite construction. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Mukwanason, D E; Tutesigensi, A; Kayondo, M and Mutikanga, H E (2023) Impact of project quality culture on defects in infrastructure projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Najafi, M.; Rahimian, F.; Zaki Abdelaziz, Y.; Poppe, J. and Rodriguez Trejo, S. (2026) User-side regime dynamics and design-use misalignments in circular construction transitions. Engineering, Construction and Architectural Management, pp. 1-33. ISSN 0969-9988
Nelson, T N T (2024) Using socio-technical water systems in construction engineering to address water insecurity after hurricanes maria and fiona. PhD thesis, Iowa State University, USA.
Nguyen, Anh Chi (2023) Risk allocation, decision rights, and adaptive lifecycle project management practices in public-private partnership highway contracts in Australia, the Philippines, and India. PhD thesis, Virginia Tech, USA.
Ning, Y and Ling, F Y Y (2013) Reducing hindrances to adoption of relational behaviors in public construction projects. Journal of Construction Engineering and Management, 139(11): 4013017, ISSN 0733-9364
Ogunsanya, O A; Aigbavboa, C O; Thwala, D W and Edwards, D J (2022) Barriers to sustainable procurement in the Nigerian construction industry: An exploratory factor analysis. International Journal of Construction Management, 22(5), pp. 861-872. ISSN 1562-3599
Ono, Eikichi (2025) Occupant-centric design for functional and thermal zoning at activity-based workspaces. PhD thesis, National University of Singapore, Singapore.
Orvik, C. P. and Albrechtsen, E. (2026) The mismatch between conceptualization and measurements of safety performance: Insights from a qualitative study of the Norwegian construction industry. Construction Management and Economics, 44(5), pp. 319-336. ISSN 0144-6193
Osuizugbo, I. C.; Awuzie, B. O. and Olorunlogbon, O. O. (2026) Assessing the proficiency and application of artificial intelligence skills among construction professionals in a developing country: Evidence from Nigeria. Journal of Engineering, Design and Technology, ISSN 1726-0531
Othman, A A E and Hussein, R M (2024) Innovation management framework for achieving sustainability through managing risks of innovative solutions during the design process. Journal of Engineering, Design and Technology, 22(6), pp. 1870-1893. ISSN 1726-0531
Papadonikolaki, E and van Oel, C (2016) The actors' perceptions and expectations of their roles in BIM-based collaboration. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Pavitt, T C and Gibb, A G F (1999) Managing organizational interfaces in the cladding supply chain: Initial results from expert interviews. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Pavitt, T C and Gibb, A G F (2003) Interface management within construction: In particular, building facade. Journal of Construction Engineering and Management, 129(1), pp. 8-15. ISSN 0733-9364
Petrova, E (2019) AI for BIM-based sustainable building design: Integrating knowledge discovery and semantic data modelling for evidence-based design decision support. PhD thesis, Aalborg University, Denmark.
Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988
Rose, T and Manley, K (2010) Motivational misalignment on an iconic infrastructure project. Building Research & Information, 38(2), pp. 144-156. ISSN 0961-3218
Rose, T M and Manley, K (2012) Adoption of innovative products on Australian road infrastructure projects. Construction Management and Economics, 30(4), pp. 277-298. ISSN 1466433X
Rosenfeld, Y; Warszawski, A and Laufer, A (1992) Using quality circles to raise productivity and quality of work life. Journal of Construction Engineering and Management, 118(1), pp. 17-33. ISSN 0733-9364
Rowlinson, S (2001) Matrix organizational structure, culture and commitment: A Hong Kong public sector case study of change. Construction Management and Economics, 19(7), pp. 669-673. ISSN 01446193
Roza, C (2006) Environmental assessment: The Eden project. PhD thesis, University College London, UK.
Ruddock, L and Wharton, A (2001) Analysing the construction sector: Progress towards a new framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Salvado, F; Almeida, N and Vale e Azevedo, A (2020) Aligning financial and functional equivalent depreciations rates of building assets. Engineering, Construction and Architectural Management, 27(2), pp. 441-457. ISSN 0969-9988
Samarasinghe, D A S (2014) Building materials supply chains: An evaluative study of the New Zealand residential construction. PhD thesis, Auckland University of Technology, New Zealand.
Sanga, S A (2020) Compliance with building material specifications among informal skilled construction workers in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 25(2), pp. 63-91. ISSN 1823-6499
Sari, R. and Pekeriçli, M. K. (2026) Possibility of personalization and customization of the workplace by knowledge workers. Building Research & Information, 54(4), pp. 410-428. ISSN 0961-3218
Sayed Suleiman, R (2019) Understanding site offices challenges to communicate and exchange information using technology in UK: main contractor perspective. PhD thesis, University of Salford, UK.
Seboni, L (2016) Improving the existing project manager-to-project practice of a specific organization (organization A) in Botswana. PhD thesis, University of Leeds, UK.
Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.
Sha'ar, K. Z.; Assaf, S. A.; Bambang, T.; Babsail, M. and Fattah, A. M. A. E. (2017) Design-construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599
Sha'ar, K Z; Assaf, S A; Bambang, T; Babsail, M and Fattah, A M A E (2017) Design–construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599
Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.
Shehadeh, A and Alshboul, O (2025) Game theory integration in construction management: A comprehensive approach to cost, risk, and coordination under uncertainty. Journal of Construction Engineering and Management, 151(5): 04025039, ISSN 0733-9364
Singla, H K (2020) Does family ownership affect the profitability of construction and real estate firms? Evidence from India. Journal of Financial Management of Property and Construction, 25(1), pp. 107-124. ISSN 1366-4387
Sprau Coulter, T L (2014) Improving energy audit process and report outcomes through planning initiatives. PhD thesis, Pennsylvania State University, USA.
Ssimbwa, Edward (2023) Streamlining the management of building construction regulatory framework in Sub-Sahara africa's public service - a case for Uganda. DM thesis, Colorado Technical University, USA.
Sutrisna, M; Ramanayaka, C D D and Goulding, J S (2018) Developing work breakdown structure matrix for managing offsite construction projects. Architectural Engineering and Design Management, 14(5), pp. 381-397. ISSN 1745-2007
Teli, D; James, P A B and Jentsch, M F (2015) Investigating the principal adaptive comfort relationships for young children. Building Research & Information, 43(3), pp. 371-382. ISSN 0961-3218
Tennakoon, G A; Rameezdeen, R and Chileshe, N (2024) Walking the talk towards sustainable consumption: Interventions to promote the uptake of reprocessed construction materials. Engineering, Construction and Architectural Management, 31(7), pp. 2878-2899. ISSN 0969-9988
Thomson, D S; Carter, K and Grant, F (2017) Unpacking cohort social ties: The appropriateness of perceived social capital to graduate early career performance in construction project teams. International Journal of Construction Education and Research, 13(4), pp. 299-316. ISSN 1557-8771
Tian, Y (2022) Financing infrastructure through blockchain tokenization. PhD thesis, University of Florida, USA.
Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364
Tseladikae, T.; Agumba, J.; Ochieng, G.; Adebowale, O. J. and Edwards, D. (2026) Correlation analysis of project management practices and performance outcomes in social housing projects. International Journal of Construction Management, 26(10), pp. 2085-2100. ISSN 1562-3599
Tuuli, M M (2009) Empowerment and control dynamics in project teams: a multilevel examination of the antecedents and jobperformance consequences. PhD thesis, University of Hong Kong, Hong Kong.
Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.
Viking, A and Stehn, L (2015) Exploring Swedish local planning authorities'perceptions of standardized housing construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Volker, L; Eriksson, P E; Kadefors, A and Larsson, J (2018) A case-based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Walzer, A N; Tan, T; Graser, K and Hall, D M (2025) Bug or feature? Institutional misalignments between construction technology and venture capital. Construction Management and Economics, 43(2), pp. 130-152. ISSN 0144-6193
Weshah, N A (2015) Developing an interface management (im) model for construction projects. PhD thesis, University of Calgary, Canada.
Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.
Windapo, A; Adediran, A and Olugboyega, O (2019) Procurement strategies influencing small and medium contractor development in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 253-263. ISSN 17514304
Wong, J M W; Chan, A P C and Chiang, Y H (2011) Construction manpower demand forecasting: A comparative study of univariate time series, multiple regression and econometric modelling techniques. Engineering, Construction and Architectural Management, 18(1), pp. 7-29. ISSN 0969-9988
Wu, C.; Luo, J.; Hong, Y.; Tan, Y. and Lan, W. (2026) A DfMA-incorporating parametric design approach for enhancing constructability in BIM-enabled architectural design in off-site construction. Journal of Construction Engineering and Management, 152(10): 05026006, ISSN 0733-9364
Wuni, I Y; Shen, G Q and Saka, A B (2023) Computing the severities of critical onsite assembly risk factors for modular integrated construction projects. Engineering, Construction and Architectural Management, 30(5), pp. 1864-1882. ISSN 0969-9988
Yik, F W H and Lee, W L (2004) Partnership in building energy performance contracting. Building Research & Information, 32(3), pp. 235-243. ISSN 0961-3218
Yusuf, A O; Afolabi, A; Akanmu, A; Murzi, H; Nieto Leal, A; Ball, S and Ofori-Boadu, A (2025) Collaborations between industry and academia for future workforce development: Construction practitioners’ perspective. Engineering, Construction and Architectural Management, 32(5), pp. 3166-3186. ISSN 0969-9988
Zerihun, A; Beza, D and Idrisi, M J (2025) Factors affecting contractor and subcontractor relationship and their effects on building project performance: Case of Addis Ababa. International Journal of Construction Management, 25(14), pp. 1716-1724. ISSN 1562-3599
Zhang, L and El-Gohary, N M (2017) Human-centered value analysis: Building-value aggregation based on human values and building-system integration. Journal of Construction Engineering and Management, 143(8): 04017040, ISSN 0733-9364
Zhou, T; Xia, P; Ye, Y and Du, J (2023) Embodied robot teleoperation based on high-fidelity visual-haptic simulator: Pipe-fitting example. Journal of Construction Engineering and Management, 149(12): 04023129, ISSN 0733-9364
Zhou, T; Zhu, Q; Shi, Y and Du, J (2022) Construction robot teleoperation safeguard based on real-time human hand motion prediction. Journal of Construction Engineering and Management, 148(7): 04022040, ISSN 0733-9364
Zhou, T; Zhu, Q; Ye, Y and Du, J (2023) Humanlike inverse kinematics for improved spatial awareness in construction robot teleoperation: Design and experiment. Journal of Construction Engineering and Management, 149(7): 04023044, ISSN 0733-9364
Zhu, X.; Ma, J.; Chen, W. and Tan, Y. (2026) Llm-querybc: An llm-based regulation query system for textual and tabular information in building codes. Journal of Construction Engineering and Management, 152(6): 04026075, ISSN 0733-9364
Zhu, Q (2022) Haptic interaction for human-robot shared perception in construction. PhD thesis, University of Florida, USA.
olde Scholtenhuis, L L; Dorée, A G and Hartmann, T (2011) Challenges for construction it adoption on project level. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
van Uden, M; Wamelink, H; van Bueren, E and Heurkens, E (2025) Aligning practices towards a circular economy in the architecture, engineering, and construction sector: Seven transitions in different stages of reconfiguration. Construction Management and Economics, 43(2), pp. 153-174. ISSN 0144-6193
Up a level