Items with Subject: electrical systems

Number of items: 43.

Amewornu, E M and Nwulu, N I (2021) A framework for the techno-economic and reliability analysis of grid connected microgrids. Journal of Engineering, Design and Technology, 19(3), pp. 659-685. ISSN 1726-0531

Ayda Montaser, K and Heidari, S (2021) Optimizing window size by integrating energy and lighting analyses considering occupants' visual satisfaction. Built Environment Project and Asset Management, 11(4), pp. 673-686. ISSN 2044-124X

Barras, G C and Mayo, R E (1995) Minidirectional drilling for installation of underground electrical conduit. Journal of Construction Engineering and Management, 121(4), pp. 364-369. ISSN 0733-9364

Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The Batalha Monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708

Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The batalha monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708

Burchett, J F and Tummala, V M R (1998) The application of the risk management process in capital investment decisions for EHV transmission line projects. Construction Management and Economics, 16(2), pp. 235-244. ISSN 01446193

Chan, Zenobia Tin Yan (2024) Alms and influence the dynamics of inducements and concessions in international politics. PhD thesis, Princeton University, USA.

Chasey, A D and Merchant, S (2000) Issues for construction of 300-mm fab. Journal of Construction Engineering and Management, 126(6), pp. 451-457. ISSN 0733-9364

Cribbs, J (2016) Workflow management using building information modeling (BIM) for prefabrication in a construction retrofit environment. PhD thesis, Arizona State University, USA.

Dzeng, R J (2006) Identifying a design management package to support concurrent design in building wafer fabrication facilities. Journal of Construction Engineering and Management, 132(6), pp. 606-614. ISSN 0733-9364

Fang, T; Sun, L; Xu, X; Li, H and Shao, Z (2024) Exploring the impacts of spatial morphology of underground shopping mall atriums on natural lighting performance. Architectural Engineering and Design Management, 20(4), pp. 808-831. ISSN 1745-2007

Francis, A and Skitmore, M (2005) Risk management within the electrical distribution supply industry in South East Queensland. Journal of Financial Management of Property and Construction, 10(1), pp. 45-54. ISSN 1366-4387

Gabai, D S; Haronian, E; Sacks, R; Kennard, N S; Wong, N; Miera, M K and Cloyd, T D (2026) Doubling throughput and halving project durations: Lessons from intel's ocf strategy for project portfolio management. Journal of Construction Engineering and Management, 152(2): 04025256, ISSN 0733-9364

Gaber, B; Zhan, C; Han, X; Omar, M and Li, G (2024) Employing ANN for daylight and energy prediction of hot climate office buildings: A case study of new cairo, Egypt. Architectural Engineering and Design Management, 20(6), pp. 1752-1776. ISSN 1745-2007

Gaddala, K and Raju, P S (2020) Optimal location of UPQC for power quality improvement: Novel hybrid approach. Journal of Engineering, Design and Technology, 18(6), pp. 1519-1541. ISSN 1726-0531

Ghosh, A (2015) Analyzing the impact of building information modeling (BIM) on labor productivity in retrofit construction: Case study at a semiconductor manufacturing facility. PhD thesis, Arizona State University, USA.

Gil, N and Tommelein, I D (2003) Using product and process flexibility to cope with project delivery uncertainty. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193

Gil, N A P d A P (2001) Product-process development simulation to support specialty contractor involvement in early design. PhD thesis, University of California, Berkeley, USA.

Gill, N; Tommelein, I D; Stout, A and Garrett, T (2005) Embodying product and process flexibility to cope with challenging project deliveries. Journal of Construction Engineering and Management, 131(4), pp. 439-448. ISSN 0733-9364

Hosseini, S. M.; Heidari, S.; Attia, S.; Wang, J. and Triantafyllidis, G. (2026) Biomimetic kinetic façade as a real-time daylight control: Complex form versus simple form with proper kinetic behavior. Smart and Sustainable Built Environment, 15(2), pp. 472-507. ISSN 2046-6099

Kumar, S D; Kumar, K B and Sharma, R K (2014) Delay model for dynamically switching coupled on-chip interconnects. Journal of Engineering, Design and Technology, 12(3), pp. 364-373.

Mamphweli, N S and Meyer, E L (2011) Development of a cyclone with internal electric field. Journal of Engineering, Design and Technology, 9(3), pp. 313-322. ISSN 1726-0531

Motjolopane, B P and van Zyl, R (2009) A review of rectenna models for electromagnetic energy harvesting. Journal of Engineering, Design and Technology, 7(3), pp. 282-292. ISSN 1726-0531

Ogunyanda, K; Fritz, W and van Zyl, R (2015) PSIM simulations of a DC squid magnetometer. Journal of Engineering, Design and Technology, 13(2), pp. 298-314.

Olbina, S and Beliveau, Y (2009) Developing a transparent shading device as a daylighting system. Building Research & Information, 37(2), pp. 148-163. ISSN 0961-3218

Ortiz, S S (2025) Strengthening construction supply chains: An exploration of decision-making frameworks for resilience in the face of black swan event. PhD thesis, Purdue University, Indiana, USA.

Pandian, A N and Palanivelu, A (2021) Metaheuristic optimization based placement of svcs with multiple objectives. Journal of Engineering, Design and Technology, 19(6), pp. 1586-1600. ISSN 1726-0531

Pieters, W D and Tzoneva, R (2021) Investigation of an iec 61850 standard-based process bus implementation of a protection and control scheme for parallelly connected transformers. Journal of Engineering, Design and Technology, 19(4), pp. 850-875. ISSN 1726-0531

Ramani, P V and Lingan, L K (2022) Developing a lean model to reduce the design process cost of gas insulated switchgear foundation using value stream mapping–a case study. International Journal of Construction Management, 22(4), pp. 669-677. ISSN 1562-3599

Rana Abdollahi, R; Bagherzadeh, F; Schnabel, M A and Bakshi, N (2024) A design methodology to consider occupants' spatial adjustment and manage view content in adaptive façade design for improving visual comfort. Architectural Engineering and Design Management, 20(1), pp. 168-190. ISSN 1745-2007

Sharma, D K; Kaushik, B K and Sharma, R K (2014) Impact of driver size and interwire parasitics on crosstalk noise and delay. Journal of Engineering, Design and Technology, 12(4), pp. 475-490.

Sibanda, M and van Zyl, R R (2016) Practical electromagnetic compatibility studies of a cubesat. Journal of Engineering, Design and Technology, 14(4), pp. 770-780.

Simon, M and Meyer, E L (2012) Low cost I-V system employing variable power supply unit as an electronic load. Journal of Engineering, Design and Technology, 10(3), pp. 330-344. ISSN 1726-0531

Sorooshnia, E; Rashidi, M; Rahnamayiezekavat, P; Rezaei, F and Samali, B (2023) Optimum external shading system for counterbalancing glare probability and daylight illuminance in sydney's residential buildings. Engineering, Construction and Architectural Management, 30(1), pp. 296-320. ISSN 0969-9988

Subramaniyan, A S (2020) Engineering procurement and construction companies in India: Which factors drive their willingness to pay. PhD thesis, Chitkara University, Punjab, India.

Teizer, J; Venugopal, M; Teizer, W and Felkl, J (2012) Nanotechnology and its impact on construction: Bridging the gap between researchers and industry professionals. Journal of Construction Engineering and Management, 138(5), pp. 594-604. ISSN 0733-9364

Thakur, N; Awasthi, Y K; Hooda, M and Siddiqui, A S (2019) Adaptive whale optimization for intelligent multi-constraints power quality improvement under deregulated environment. Journal of Engineering, Design and Technology, 17(3), pp. 490-514. ISSN 1726-0531

Valitabar, M; GhaffarianHoseini, A; GhaffarianHoseini, A and Attia, S (2022) Advanced control strategy to maximize view and control discomforting glare: A complex adaptive façade. Architectural Engineering and Design Management, 18(6), pp. 829-849. ISSN 1745-2007

Verma, S K and Kaushik, B K (2015) Bus encoder design for crosstalk and power reduction in rlc modelled vlsi interconnects. Journal of Engineering, Design and Technology, 13(3), pp. 486-498.

Vinodh, S; Sundararaj, G; Devadasan, S R and Rajanayagam, D (2008) Quantification of agility: An experimentation in an Indian electronics switches manufacturing company. Journal of Engineering, Design and Technology, 6(1), pp. 48-64. ISSN 1726-0531

Weinstein, M; Gambatese, J and Hecker, S (2005) Can design improve construction safety? Assessing the impact of a collaborative safety-in-design process. Journal of Construction Engineering and Management, 131(10), pp. 1125-1134. ISSN 0733-9364

Zani, A; Speroni, A; Mainini, A G; Zinzi, M; Caldas, L and Poli, T (2024) Customized shading solutions for complex building façades: The potential of an innovative cement-textile composite material through a performance-based generative design. Construction Innovation, 24(1), pp. 256-279. ISSN 1471-4175

This list was generated on Sat Aug 22 02:34:34 2026 UTC.