Items with Subject: dispute resolution
Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364
Abbas, N M A (1998) The impact of construction contract models on construction claims in Saudi Arabia. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Abd Jamil, A H and Fathi, M S (2020) Enhancing BIM-based information interoperability: Dispute resolution from legal and contractual perspectives. Journal of Construction Engineering and Management, 146(7): 05020007, ISSN 0733-9364
Abdalall, S (2017) Concurrent delay analysis in public works construction disputes: a cross-jurisdictional study of Egypt, Scotland and England. PhD thesis, University of Strathclyde, UK.
Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City. PhD thesis, University of Newcastle upon Tyne, UK.
Abdalla, S B; Mushtaha, E; Rashid, M; Opoku, A; Hamad, R; Dweiri, F and Elmualim, A (2023) Pre-design CSFs (critical success factors) of building projects for dubai's development boom. Built Environment Project and Asset Management, 13(3), pp. 359-374. ISSN 2044-124X
Abdallah, A; Assaf, S and Hassanain, M A (2019) Assessment of the consequences of deficiencies in design documents in Saudi Arabia. Architectural Engineering and Design Management, 15(4), pp. 282-296. ISSN 1745-2007
Abdallah, A M (2021) A study on bridge inspections: Identifying barriers to new practices and providing strategies for change. PhD thesis, Colorado State University, USA.
Abdel Aziz, A M (2007) A survey of the payment mechanisms for transportation DBFO projects in British columbia. Construction Management and Economics, 25(5), pp. 529-543. ISSN 1466433X
Abdel Aziz, A M (2021) The practice of roadway safety management in public-private partnerships. Journal of Construction Engineering and Management, 147(12): 04021173, ISSN 0733-9364
Abdel Meguid, T A (1998) Managed claims procurement strategy (MCPS): A comparative study of the performance of alternate building procurement strategies. PhD thesis, Universite de Montreal, Canada.
Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599
Abdel-Hamid, M and Mohamed Abdelhaleem, H (2022) Impact of poor labor productivity on construction project cost. International Journal of Construction Management, 22(12), pp. 2356-2363. ISSN 1562-3599
Abdelalim, A M; Salem, M; Al-Sabah, R; Said, S O; ElShafei, H M and Galal Badawy, M (2025) Optimizing claim management process groups to enhance construction project success. International Journal of Construction Management, 25(13), pp. 1583-1595. ISSN 1562-3599
Abdelhamid, T S (1999) Measuring and evaluating physiological demands of construction work. PhD thesis, University of Michigan, USA.
Abdelhamid, T S and Everett, J G (1999) Physiological demands of concrete slab placing and finishing work. Journal of Construction Engineering and Management, 125(1), pp. 47-52. ISSN 0733-9364
Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues. PhD thesis, KTH Royal Institute of Technology, Sweden.
Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029
Abdul Majid, M Z (1997) Non-excusable delays in construction. PhD thesis, Loughborough University, UK.
Abdul Nabi, M (2023) Promoting enhanced decision-making and proactive management for modularization in the construction industry using risk-based approach, analytical hierarchy process, and graph theory. PhD thesis, Missouri University of Science and Technology, USA.
Abdul Nabi, M and El-Adaway, I H (2022) Understanding disputes in modular construction projects: Key common causes and their associations. Journal of Construction Engineering and Management, 148(1): 04021184, ISSN 0733-9364
Abdul-Aziz, A R and How, Y M (2012) To-be-reclaimed land swap for new highway: The Jelutong expressway case. International Journal of Construction Management, 12(4), pp. 1-16. ISSN 1562-3599
Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.
Abdurezake, S K; Mengistu, D G; Abdela, S A and Tesfaye, B Z (2026) Construction professionals' retention practice in construction companies. International Journal of Construction Management, 26(3), pp. 365-380. ISSN 1562-3599
Abolghasemi, M.; Al-Mhdawi, M. K. S.; Rahimian, F. and Qazi, A. (2026) Exploring the nexus of stakeholder management, project performance and stakeholder satisfaction in Malaysian residential building projects: A PLS-SEM approach. Engineering, Construction and Architectural Management, 33(3), pp. 2089-2117. ISSN 0969-9988
Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988
Abotaleb, I S (2018) Construction dispute mitigation: quantitative and qualitative analytic approach with a focus on bidding, out-of-sequence work, and contract analysis. PhD thesis, University of Tennessee, USA.
Abourizk, S M and Dozzi, S P (1993) Application of computer simulation in resolving construction disputes. Journal of Construction Engineering and Management, 119(2), pp. 355-373. ISSN 0733-9364
Abu Dabous, S (2008) A decision support methodology for rehabilitation management of concrete bridges. PhD thesis, Concordia University, Canada.
Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364
Aburas, M (2020) Critical success factors for implementing ISO 9001 in UK construction projects. PhD thesis, University of Salford, UK.
Abusnina, H (2019) Combining engineering and data-driven approaches to model the risk of excavation damage to underground natural gas facilities. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.
Adams, K A (2023) A multi-hazard cascading risk model for coastal rail infrastructure: numerical modelling & engineering failure analysis. PhD thesis, Brunel University, UK.
Adamtey, S and Kereri, J O (2023) Risk management in residential projects in the United States: Implementation status, evaluation techniques and barriers. Journal of Engineering, Design and Technology, 21(5), pp. 1481-1500. ISSN 1726-0531
Adebimpe, O A; Proverbs, D G and Oladokun, V O (2021) A fuzzy-analytic hierarchy process approach for measuring flood resilience at the individual property level. International Journal of Building Pathology and Adaptation, 39(2), pp. 197-217. ISSN 23984708
Adebowale, O J (2018) A multi-stakeholder approach to productivity improvement in the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.
Adediran, A (2018) Modelling targeted procurement strategies and relationship quality criteria influencing the development of small contractors in South Africa. PhD thesis, University of Cape Town, South Africa.
Adedokun, O; Egbelakin, T and Omotayo, T (2024) Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 66-74. ISSN 1562-3599
Adegoriola, M I; Lai, J H K; Yung, E H K and Chan, E H W (2024) Development of a significant index model for assessing heritage building maintenance management challenges. Engineering, Construction and Architectural Management, 31(8), pp. 3398-3428. ISSN 0969-9988
Adibfar, A (2020) Bridge digital twins: Fusion of intelligent transportation systems (ITS) sensor data and bridge information modeling (BRIM) for interoperability. PhD thesis, University of Florida, USA.
Adigbo, F A (2020) Stakeholder engagement and construction project performance in Ghana. PhD thesis, Northcentral University, USA.
Afum, E; Issau, K; Agyabeng-Mensah, Y; Baah, C; Dacosta, E; Essandoh, E and Agyenim Boateng, E (2023) The missing links of sustainable supply chain management and green radical product innovation between sustainable entrepreneurship orientation and sustainability performance. Journal of Engineering, Design and Technology, 21(1), pp. 167-187. ISSN 1726-0531
Afum, E; Sun, Z; Agyabeng-Mensah, Y and Baah, C (2023) Lean production systems, social sustainability performance and green competitiveness: The mediating roles of green technology adoption and green product innovation. Journal of Engineering, Design and Technology, 21(1), pp. 206-227. ISSN 1726-0531
Afzal, F; Yunfei, S; Sajid, M and Afzal, F (2020) Integrated priority decision index for risk assessment in chaos: Cost overruns in transport projects. Engineering, Construction and Architectural Management, 27(4), pp. 825-849. ISSN 0969-9988
Agapiou, A (2011) Scottish construction lawyers' awareness and experiences of alternative dispute resolution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 181-192. ISSN 17514304
Agapiou, A (2013) UK construction participants' experiences of adjudication. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 137-144. ISSN 17514312
Agapiou, A (2015) The factors influencing mediation referral practices and barriers to its adoption: A survey of construction lawyers in England and Wales. International Journal of Law in the Built Environment, 7(3), pp. 231-247. ISSN 1756-1450
Agapiou, A (2022) Briefing: The role of the technology and construction court in alternative dispute resolution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 61-64. ISSN 1751-4304
Agapiou, A and Clark, B (2011) Scottish construction lawyers and mediation: An investigation into attitudes and experiences. International Journal of Law in the Built Environment, 3(2), pp. 159-181. ISSN 1756-1450
Agapiou, A and Clark, B (2014) Construction mediation in Scotland: A comparison of the views and experiences of lawyers and end-users. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Agarwal, U A; Baral, R and Rastogi, M (2025) Work–family conflict and work engagement among construction professionals: Role of psychological contract breach and gender. Engineering, Construction and Architectural Management, 32(4), pp. 2507-2532. ISSN 0969-9988
Aggor, K K (2017) Relationship between budget and project success factors in the Ghanaian building construction sector. PhD thesis, Walden University, USA.
Agyemang, E.; Deku, C. S.; Owusu-Mante, S.; Forkuor, J. B.; Dwumah, P. and Ofori-Dua, K. (2026) Housing adaptations for climate resilience: Predictors of climate-responsive housing in coastal and savannah zones. Smart and Sustainable Built Environment, pp. 1-25. ISSN 2046-6099
Ahaotu, S M (2018) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.
Ahaotu, Sylvia M (2019) Effective implementation of total quality management within the Nigerian construction industry. PhD thesis, University of Salford, UK.
Ahmed, M O; Abdul Nabi, M; El-Adaway, I H; Caranci, D; Eberle, J; Hawkins, Z and Sparrow, R (2021) Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11): 05021008, ISSN 0733-9364
Ahuja, V; Yang, J and Shankar, R (2009) Benefits of collaborative ICT adoption for building project management. Construction Innovation, 9(3), pp. 323-340. ISSN 1471-4175
Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(1), pp. 45-54. ISSN 01446193
Aibinu, A A; Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors' perspectives. Construction Management and Economics, 29(5), pp. 463-481. ISSN 1466433X
Aibinu, A A; Ofori, G and Ling, F Y Y (2008) Explaining cooperative behavior in building and civil engineering projects' claims process: Interactive effects of outcome favorability and procedural fairness. Journal of Construction Engineering and Management, 134(9), pp. 681-691. ISSN 0733-9364
Aigbavboa, C O; Oke, A E; Aghimien, D O and Akinradewo, O I (2020) Improving resilience of cities through smart city drivers. Construction Economics and Building, 20(2), pp. 45-64. ISSN 2204-9029
Ajibike, W A; Adeleke, A Q; Mohamad, F; Bamgbade, J A and Moshood, T D (2023) The impacts of social responsibility on the environmental sustainability performance of the Malaysian construction industry. International Journal of Construction Management, 23(5), pp. 780-789. ISSN 1562-3599
Akhavian, R and Behzadan, A H (2013) Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining. Journal of Construction Engineering and Management, 139(11): 4013021, ISSN 0733-9364
Akhavian, Reza (2015) Data-driven simulation modeling of construction and infrastructure operations using process knowledge discovery. PhD thesis, University of Central Florida, USA.
Akinsola, A O (1997) An intelligent model of variations' contingency on constructions projects. PhD thesis, University of Wolverhampton, UK.
Akintoye, A; Renukappa, S and Lal, H (2012) The abolition of the contracts in writing rule in the 2009 Construction Act: Potential implications for UK adjudication. International Journal of Law in the Built Environment, 4(2), pp. 140-156. ISSN 1756-1450
Akujuru, V A and Ruddock, L (2015) Dichotomising compulsory land acquisition and land contamination valuations. International Journal of Disaster Resilience in the Built Environment, 6(3), pp. 268-288. ISSN 1759-5916
Al Dinah, M (2022) Coordination issues and unethical practices in comparison with other determinants of delays and cost overruns in the construction industry: how do the participants respond? PhD thesis, University of Portsmouth, UK.
Al Nahyan, Moza Tahnoon (2012) Management of mega infrastructure projects in the United Arab Emirates. PhD thesis, Monash University, Australia.
Al Niyadi, R (2024) Public relations mediation in citizen engagement for Oman’s nation-building: The case of Oman vision 2040. PhD thesis, Lancaster University, UK.
Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.
Al Rashdi, A (2012) A strategic framework for the further enhancement of the standard forms of construction contract in the Sultanate of Oman. PhD thesis, University of Salford, UK.
Al-Ameen, H A (2012) Antitrust: the person-centred approach. PhD thesis, Swansea University, UK.
Al-Azemi, K (2012) Risk management for build, operate and transfer projects within Kuwait. PhD thesis, Loughborough University, UK.
Al-Bahar, J F (1988) Risk management in construction projects: A systematic analytical approach for contractors. PhD thesis, University of California, Berkeley, USA.
Al-Bayati, A J and Panzer, L (2019) Reducing damage to underground utilities: Lessons learned from damage data and excavators in North Carolina. Journal of Construction Engineering and Management, 145(12): 04019078, ISSN 0733-9364
Al-Bayati, A J and Panzer, L (2020) Reducing damages to underground utilities: Importance of stakeholders' behaviors. Journal of Construction Engineering and Management, 146(9): 04020107, ISSN 0733-9364
Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.
Al-Dughaither, K A (1996) International construction financing strategies: Influential factors and decision-making. PhD thesis, Carnegie Mellon University, USA.
Al-Fadhali, N; Zainal, R; Kasim, N; Dodo, M; Kim Soon, N and Hasaballah, A H A (2019) The desirability of integrated influential factors (IIFS) model of internal stakeholder as a panacea to project completion delay in Yemen. International Journal of Construction Management, 19(2), pp. 128-136. ISSN 1562-3599
Al-Gahtani, K S (2006) A comprehensive construction delay analysis technique: Enhanced with a float ownership concept. PhD thesis, State University of New York at Buffalo, USA.
Al-Gahtani, K S (2009) Float allocation using the total risk approach. Journal of Construction Engineering and Management, 135(2), pp. 88-95. ISSN 0733-9364
Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.
Al-Humaidi, H M (2016) Construction projects bid or not bid approach using the fuzzy technique for order preference by similarity FTOPSIS method. Journal of Construction Engineering and Management, 142(12): 04016068, ISSN 0733-9364
Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599
Al-Sehali, J (2001) A framework for total quality management in the construction industry in Bahrain. PhD thesis, Loughborough University, UK.
Al-Sobiei, O S (2001) Assessment of risk allocation in construction projects. PhD thesis, Illinois Institute of Technology, USA.
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Managing owner's risk of contractor default. Journal of Construction Engineering and Management, 131(9), pp. 973-978. ISSN 0733-9364
Al-Sobiei, O S; Arditi, D and Polat, G (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics, 23(4), pp. 423-430. ISSN 01446193
Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988
Al-Tabtabai, H M (1989) PROCON: A knowledge-based approach to construction project control. PhD thesis, University of Colorado at Boulder, USA.
Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. PhD thesis, University of California, Berkeley, USA.
Al-Turfi, S (2017) Best practice project management for the sustainable regeneration of Holy Karbala Province in Iraq. PhD thesis, University of Bolton, UK.
Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.
Alam, M K and Hasan, M D R (2010) Protection works against wave attacks in the haor areas of Bangladesh: Analysis of sustainability. Journal of Construction in Developing Countries, 15(2), pp. 69-85. ISSN 1823-6499
Alarcón-Ramirez, D; Oliveros-Romero, J and Mahn, D (2026) Performance comparison of public–private partnerships and traditionally procured hospitals. Construction Management and Economics, 44(2), pp. 79-97. ISSN 0144-6193
Aldawaish, B (2019) Investigating the relationship between top management teams' characteristics and organisational innovation: the mediating role of dynamic capabilities. PhD thesis, Brunel University, UK.
Alexander, D; Hallowell, M and Gambatese, J (2017) Precursors of construction fatalities. I: Iterative experiment to test the predictive validity of human judgment. Journal of Construction Engineering and Management, 143(7): 04017023, ISSN 0733-9364
Alfadhli, A (2013) Does the alternative dispute resolution have a role to play in the construction industry in the State of Kuwait?: look into the most appropriate methodology that may be taken in Kuwait in comparison with what are available in the English legal system. PhD thesis, University of Southampton, UK.
Alghamdi, A M (2022) A systemic approach for construction contract claims settlement in the Kingdom of Saudi Arabia. PhD thesis, University of Reading, UK.
Alharbi, S (2020) The influence of human resources management on job embeddedness and voluntary turnover intention: a case study of the constructions industry in Saudi Arabia. PhD thesis, University of Plymouth, UK.
Alhumaidi, H M (2015) Construction contractors ranking method using multiple decision-makers and multiattribute fuzzy weighted average. Journal of Construction Engineering and Management, 141(4): 04014092, ISSN 0733-9364
Ali, J A; Al-Kharusi, S; Khwaja, M G; Razzak, M R and Bashir, S (2025) Requirement engineering and project performance: Mediating effect of communication effectiveness, change readiness, stakeholder engagement and moderating effect of team cohesion. Engineering, Construction and Architectural Management, 32(8), pp. 5484-5507. ISSN 0969-9988
Ali, B; Aibinu, A and Paton-Cole, V (2023) Facilitating agreement in disruption claims through disruption analysis methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Ali, B; Aibinu, A A and Paton-Cole, V (2024) Closing the information gaps: A systematic review of research on delay and disruption claims. Construction Innovation, 24(3), pp. 790-810. ISSN 1471-4175
Alkass, S; Tribaldos, E; Mazerolle, M and Harris, F (1995) Computer aided construction delay analysis and claims preparation. Construction Management and Economics, 13(4), pp. 335-352. ISSN 01446193
Alkhamali, K S H (2014) Leadership style, organisational culture and disputes in public construction. PhD thesis, Heriot-Watt University, UK.
Almalki, M; Salman, B; Salem, O and Ammoury, M (2026) A decision-support framework for accelerated wastewater pipeline construction: Integrating economic, social, environmental, and technical criteria. Journal of Construction Engineering and Management, 152(3): 04025263, ISSN 0733-9364
Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.
Almarri, K (2023) The value for money factors and their interrelationships for smart city public-private partnerships projects. Construction Innovation, 23(4), pp. 815-832. ISSN 1471-4175
Almatared, M M S (2024) An integrated digital twin framework and evacuation simulation system for enhanced safety in smart buildings. PhD thesis, Western Michigan University, USA.
Almeida, Rafael Goffinet de (2023) Spatialities of participation: Agencies between culture, politics and neoliberal subjectvation. PhD thesis, Universidade de São Paulo, Brazil.
Alnahari, Mohammed Saeed (2023) Exploring the potential of blockchain technology for improved management and safety of underground utilities. PhD thesis, Arizona State University, USA.
Alnuaimi, A S; Taha, R A; Al Mohsin, M and Al-Harthi, A S (2010) Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615-622. ISSN 0733-9364
Alqahtani, D (2022) A sustainability assessment framework for public-private partnerships (PPPs) in highway projects. PhD thesis, Syracuse University, USA.
Alqasmi, Khalaf (2019) An investigation of unethical practices in the Saudi Arabian construction industry. PhD thesis, RMIT University, Australia.
Alrajehi, S H (2014) Importance of KPI identification and implementation in Kuwaiti construction industry. PhD thesis, Brunel University, UK.
Alrefaie, A M; Abdul-Samad, Z; Salleh, H; Alashwal, A M and Amos, D (2023) Modelling labour productivity of reinforcement bar using polynomial regression: A study on a tropical country's weather. International Journal of Construction Management, 23(10), pp. 1633-1641. ISSN 1562-3599
Alsalman, A A (2012) Construction risks allocation: Optimal risk allocation decision support model. PhD thesis, Oregon State University, USA.
Alshahrani, S (2017) Development the a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.
Alshahrani, S A A D (2017) Development of a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.
Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique. PhD thesis, Brunel University, UK.
Alshawi, M; Engström, S and Hedgren, E (2012) Sustaining inertia? Construction clients' decision-making and information-processing approach to industrialized building innovations. Construction Innovation, 12(4), pp. 393-413. ISSN 1471-4175
Alshawi, M A and Hope, A E (1989) Expert systems and contractual disputes: Extension of time under JCT 80. Construction Management and Economics, 7(1), pp. 65-74. ISSN 01446193
Alshboul, O. and Shehadeh, A. (2026) Conflict resolution and negotiation in construction projects using game theory: Achieving win-win outcomes. International Journal of Construction Management, 26(7), pp. 1341-1364. ISSN 1562-3599
Alshihre, F; Chinyio, E; Nzekwe-Excel, C and Daniel, E I (2023) Pursuing alignment of clients' and contractors' perceptions of client satisfaction in Saudi Arabian projects. Built Environment Project and Asset Management, 13(3), pp. 341-358. ISSN 2044-124X
Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.
Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.
Altan, E and Işık, Z (2024) Digital twins in lean construction: A neutrosophic AHP – BOCR analysis approach. Engineering, Construction and Architectural Management, 31(12), pp. 5029-5056. ISSN 0969-9988
Althaqafi, Torky (2015) Using stakeholder theory to explain the development and operation of safety culture and systems to improve safety performance in the construction industry in Saudi Arabia. PhD thesis, University of Adelaide, Australia.
Altoryman, A (2014) Identification and assessment of risk factors affecting construction projects in the gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.
Altoryman, A S (2014) Identification and assessment of risk factors affecting construction projects in the Gulf region: Kuwait and Bahrain. PhD thesis, University of Manchester, UK.
Alzaben, A A (2016) Under the shadow of sharia law: the implementation of Government Procurement Agreement provisions by Saudi Arabian government tenders and procurement law. PhD thesis, University of Hull, UK.
Alzahrani, A (2015) Uncovering the emerging risks from climate change scenarios and related climate change risk management in the building sector in the UK. PhD thesis, University of Liverpool, UK.
Alzayd, Rana (2016) A constructability methodology to integrate planning and design for workers' safety in construction management. DrIng thesis, University of Braunschweig & University of Florence, Germany.
Alzeraa, A (2018) Impact of project communications effectiveness on construction disputes. PhD thesis, Wayne State University, USA.
Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599
Ameen, J R M; Neale, R H and Abrahamson, M (2003) An application of regression analysis to quantify a claim for increased costs. Construction Management and Economics, 21(2), pp. 159-165. ISSN 01446193
Ameh, O J and Daniel, E I (2017) Human resource management in the Nigerian construction firms: Practices and challenges. Journal of Construction Business and Management, 1(2), pp. 47-54. ISSN 2521-0165
Aminian, E (2015) A study of inter-firm opportunism in the construction industry. PhD thesis, University of Manchester, UK.
Aminorlah, A I; Rahim, N A; Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 57-79. ISSN 1823-6499
Aminuddin, F A B (2019) The compatibility of dispute resolution mechanisms with national culture in the construction industry: a case study of the Malaysian statutory adjudication regime. PhD thesis, University of Salford, UK.
Amoah, C and Nkosazana, H (2022) Effective management strategies for construction contract disputes. International Journal of Building Pathology and Adaptation, 41(6), pp. 70-84. ISSN 23984708
Amoo, O; Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in eastern cape South Africa: A case study. Journal of Construction Business and Management, 5(2), pp. 54-67. ISSN 2521-0165
An, T and Watanabe, T (2011) Towards the sustainable improvement in construction labour's employment in China: Cultivating subcontractor's role. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Anastasopoulos, P C; Labi, S; Bhargava, A and Mannering, F L (2012) Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), pp. 390-398. ISSN 0733-9364
Anbar, D R; Chang, T; Ullah, S; Alqershy, M T; Mousa, K and Deng, X (2026) The role of interpersonal distrust as a mediator of the relationship between ethnic minorities and knowledge hiding in international construction projects. Engineering, Construction and Architectural Management, 33(1), pp. 832-855. ISSN 0969-9988
Anbar, D. R.; Deng, X.; Taha Alqershy, M. and Ullah, S. (2026) Unveiling interpersonal distrust as a mediator between contingent employees and knowledge hiding in international construction projects in the gulf region. International Journal of Construction Management, 26(7), pp. 1390-1405. ISSN 1562-3599
Anbar, D R; Chang, T; Deng, X and Mahmoud, M R I (2024) Implementing effective knowledge management in international construction projects by eliminating knowledge hiding. Journal of Construction Engineering and Management, 150(8): 04024082, ISSN 0733-9364
Andrić, J M; Wang, J; Zou, P X W; Zhang, J and Zhong, R (2019) Fuzzy logic-based method for risk assessment of belt and road infrastructure projects. Journal of Construction Engineering and Management, 145(12): 4019082, ISSN 0733-9364
Ankrah, N A (2007) An investigation into the impact of culture on construction project performance. PhD thesis, University of Wolverhampton, UK.
Antaki, N; Petrescu, D; Schalk, M; Brandao, E; Calciu, D and Marin, V (2026) Mediation roles and ecologies within resilience-focused urban living labs. Buildings & Cities, 7(1), pp. 20-38. ISSN 2632-6655
Antino, P (2021) Interpreting the Party Wall etc Act 1996 and the implications for building below ground. PhD thesis, Anglia Ruskin University, UK.
Antoniou, F and Aretoulis, G (2019) A multi-criteria decision-making support system for choice of method of compensation for highway construction contractors in Greece. International Journal of Construction Management, 19(6), pp. 492-508. ISSN 1562-3599
Anvuur, A M and Kumaraswamy, M K (2010) Promises, pitfalls and shortfalls of the guaranteed maximum price approach: A comparative case study. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.
Apipattanavis, S; Sabol, K; Molenaar, K R; Rajagopalan, B; Xi, Y; Blackard, B and Patil, S (2010) Integrated framework for quantifying and predicting weather-related highway construction delays. Journal of Construction Engineering and Management, 136(11), pp. 1160-1168. ISSN 0733-9364
Aranda-Mena, G (2003) Mapping workers' cognitive structures of construction site hazards. PhD thesis, University of Reading, UK.
Arar, A J; Papineau, C and Poirier, E (2024) An empirical evaluation of the causes leading to binding dispute resolution mechanisms in the quebec construction industry. International Journal of Construction Management, 24(7), pp. 761-770. ISSN 1562-3599
Arditi, D; Elhassan, A and Toklu, Y C (2002) Constructability analysis in the design firm. Journal of Construction Engineering and Management, 128(2), pp. 117-126. ISSN 0733-9364
Arditi, D and Pattanakitchamroon, T (2008) Analysis methods in time-based claims. Journal of Construction Engineering and Management, 134(4), pp. 242-252. ISSN 0733-9364
Arensman, D B and Ozbek, M E (2012) Building information modeling and potential legal issues. International Journal of Construction Education and Research, 8(2), pp. 146-156. ISSN 1557-8771
Arewa, A O; Olubodun, F and Peter Swai, L (2024) Exploring nuanced approach to criminalization of late payers in the construction sector. International Journal of Construction Management, 24(10), pp. 1136-1144. ISSN 1562-3599
Arimoro, A E (2018) Ensuring a healthy legal and regulatory environment for public-private partnership in Nigeria. PhD thesis, Kingston University, UK.
Aroke, O; Hasanzadeh, S; Esmaeili, B; Dodd, M D and Brock, R (2022) Using worker characteristics, personality, and attentional distribution to predict hazard identification performance: A moderated mediation analysis. Journal of Construction Engineering and Management, 148(6): 04022033, ISSN 0733-9364
Arroyo, P (2014) Exploring decision-making methods for sustainable design in commercial buildings. PhD thesis, University of California, Berkeley, USA.
Arroyo, P; Tommelein, I D and Ballard, G (2015) Comparing AHP and CBA as decision methods to resolve the choosing problem in detailed design. Journal of Construction Engineering and Management, 141(1): 04014063, ISSN 0733-9364
Asadi, E (2020) Risk-informed multi-criteria decision framework for resilience and sustainability assessment of building structures. PhD thesis, Case Western Reserve University, USA.
Asadi, R; Rotimi, J O B and Wilkinson, S (2023) Analyzing underlying factors of rework in generating contractual claims in construction projects. Journal of Construction Engineering and Management, 149(6): 04023036, ISSN 0733-9364
Asadi, R; Wilkinson, S and Rotimi, J O B (2023) Mixed-method approach to the evaluation of rework provisions within general contract conditions. Construction Economics and Building, 23(3-4), pp. 45-70. ISSN 2204-9029
Asadi, R; Wilkinson, S and Rotimi, J O B (2023) The common causes of rework in construction contracts: A diagnostic approach. Journal of Engineering, Design and Technology, 21(4), pp. 1107-1133. ISSN 1726-0531
Asiedu, R and Iddris, F (2022) Value co-creation approach to management of construction project stakeholders. Journal of Construction in Developing Countries, 27(1), pp. 1-23. ISSN 1823-6499
Aslan, V Z (2012) Financial implications of engineering decisions. PhD thesis, Texas A&M University, USA.
Asli, R A; Wedawatta, G; Hedges, P and Park, K (2016) Building environmental assessment scheme for residential building in Brunei. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Assaad, R H; Jezzini, Y and Assaf, G (2026) Proposing and exploring integrated trade delivery as a new project delivery method: Assessing the drivers and barriers to its implementation in construction projects. Journal of Construction Engineering and Management, 152(1): 04025215, ISSN 0733-9364
Assaad, R; El-Adaway, I H; El Hakea, A H; Parker, M J; Henderson, T I; Salvo, C R and Ahmed, M O (2020) Contractual perspective for BIM utilization in US construction projects. Journal of Construction Engineering and Management, 146(12): 04020128, ISSN 0733-9364
Assadi, S O A (1997) An investigation of the records kept by supervisors on construction sites. PhD thesis, University of Newcastle upon Tyne, UK.
Assaf, S; Hassanain, M A; Abdallah, A; Sayed, A M Z and Alshahrani, A (2019) Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(5), pp. 597-615. ISSN 2044-124X
Atalah, A (2008) Effect of rock trenching vibrations on nearby structures. Journal of Construction Engineering and Management, 134(4), pp. 234-241. ISSN 0733-9364
Atanasov, V; Greenwood, D and Robson, S (2020) The management of disputes as an element of construction transaction costs: An empirical study. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Atanasov, V; Greenwood, D; Thurairajah, N and Hatcher, C (2021) Forensic delay analysis: An investigation of the reasons for disagreements in time-related disputes. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Athanasakis, D (2007) Has multiparty arbitration failed in construction disputes? Legal and practical issues in drafting joinder provisions. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Atkinson, B (2000) Inca: A retrospective performance tool for project management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Attrill, R and Mickovski, S B (2020) Issues to be addressed with current BIM adoption, prior to the implementation of BIM level 3. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Atuahene, B T; Kanjanabootra, S and Gajendran, T (2022) Preliminary benefits of big data in the construction industry: a case study. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(2), pp. 67-77. ISSN 17514304
Aunwong, P and Hadikusumo, B H W (2025) Digital 2D and 3D modelling for construction safety management in Thai construction projects. International Journal of Construction Management, 25(15), pp. 1778-1790. ISSN 1562-3599
Austigard, M S and Mattsson, J (2020) Monitoring climate change related biodeterioration of protected historic buildings. International Journal of Building Pathology and Adaptation, 38(4), pp. 529-538. ISSN 23984708
Awad, A and Fayek, A R (2013) Adaptive learning of contractor default prediction model for surety bonding. Journal of Construction Engineering and Management, 139(6), pp. 694-704. ISSN 0733-9364
Awad, A L S (2012) Intelligent contractor default prediction model for surety bonding in the construction industry. PhD thesis, University of Alberta, Canada.
Awwad, R E (2010) Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics. PhD thesis, University of Michigan, USA.
Aydin, Y C and Mirzaei, P A (2022) A novel mathematical model to measure individuals' perception of the symmetry level of building facades. Architectural Engineering and Design Management, 18(3), pp. 261-278. ISSN 1745-2007
Ayhan, M (2019) Development of dispute prediction and resolution method selection models for construction disputes. PhD thesis, Middle East Technical University, Turkey.
Ayhan, M; Dikmen, I and Talat Birgonul, M (2021) Predicting the occurrence of construction disputes using machine learning techniques. Journal of Construction Engineering and Management, 147(4): 04021022, ISSN 0733-9364
Ayodeji, A A (2008) Managing building and civil engineering project claims to reduce conflict intensity and contractors' potential to dispute. PhD thesis, National University of Singapore, Singapore.
Ayus, A M B N (1992) Building contract claims: a comparative study (Scotland, England and Malaysia). PhD thesis, University of Aberdeen, UK.
Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364
Aziz, A M A (2008) Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects. Construction Management and Economics, 26(5), pp. 507-529. ISSN 1466433X
Ağar, M (2024) A rule based expert system for delay analysis in construction projects. PhD thesis, Middle East Technical University, Turkey.
Baatz, N (2008) Problem management/dispute resolution in partnering contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 115-120. ISSN 17514312
Baatz, N (2012) The UK Construction Act process plant exclusion. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 205-206. ISSN 17514312
Baborska-Narozny, M; Bandurski, K and Grudzinska, M (2025) Understanding shading through home-use experience, measurement and modelling. Buildings & Cities, 6(1), pp. 466-489. ISSN 2632-6655
Badawy, M.; Ibrahim, A.; Hamdy, K. and Aljohani, A. (2026) A comparative analysis of barriers to prefabricated construction adoption in emerging economies: A dual fuzzy-cb-SEM and PLS-SEM approach. International Journal of Construction Management, 26(9), pp. 1978-1998. ISSN 1562-3599
Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.
Bai, L; Wang, Z; Wang, H; Huang, N and Shi, H (2021) Prediction of multiproject resource conflict risk via an artificial neural network. Engineering, Construction and Architectural Management, 28(10), pp. 2857-2883. ISSN 0969-9988
Bai, L; Zhao, X; Kang, S; Ma, Y and Zhang, B (2025) Dynamic assessment of stakeholder conflict risk for R&D project portfolios. Engineering, Construction and Architectural Management, 32(4), pp. 2342-2368. ISSN 0969-9988
Baird, A (1995) Pioneering the NEC system of documents. Engineering, Construction and Architectural Management, 2(4), pp. 249-269. ISSN 0969-9988
Bakheet, M T (1995) Contractors' risk assessment system. PhD thesis, Georgia Institute of Technology, USA.
Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Ballesteros-Lintao, R and Ameer Ali, N A N (2023) Readability and comprehensibility of Malaysian construction contracts. International Journal of Construction Management, 23(15), pp. 2649-2657. ISSN 1562-3599
Bamgbade, J A; Hosany, M M; Ajibike, W A and Chai, C S (2024) Green supply chain nuances in East Malaysian construction industry. International Journal of Construction Management, 24(5), pp. 477-485. ISSN 1562-3599
Bangaru, S S (2021) Fatigue monitoring through wearable sensors for construction workers. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice. PhD thesis, Coventry University, UK.
Bapat, H; Sarkar, D and Gujar, R (2023) Application of multi-criteria decision making for evaluation of key performance indicators of integrated project delivery and BIM model for an infrastructure transportation project in Western India. International Journal of Construction Management, 23(12), pp. 2077-2086. ISSN 1562-3599
Bappa Salisu, J (2016) The impact of compensation on public sector construction workers in Jigawa State of Nigeria. PhD thesis, University of Wolverhampton, UK.
Barbosa Resende, C (2021) Post-construction evaluation for work zones and construction engineers' training. PhD thesis, Iowa State University, USA.
Barraza, G A (2011) Probabilistic estimation and allocation of project time contingency. Journal of Construction Engineering and Management, 137(4), pp. 259-265. ISSN 0733-9364
Barros D'Sa, A A J (2003) Changes in the liabilities and concerns of the construction professions at the turn of the 21st century. PhD thesis, University of Manchester, UK.
Barutha, P J (2018) Integrated project delivery for industrial projects. PhD thesis, Iowa State University, USA.
Batra, S. (2026) A model of cognitive vulnerability in construction education: Exploring the indirect effects of institutional support on brooding rumination. Journal of Construction Engineering and Management, 152(9): 04026135, ISSN 0733-9364
Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.
Beaumont, B (2009) Confidentiality in arbitration: A myth or an achievable goal? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 141-146. ISSN 17514312
Beauregard, M A (2019) Maintaining performance evidence-based educational facility management through a decision-support tool leveraging prior empirical research. PhD thesis, Arizona State University, USA.
Bentil, K K (1990) A model approach for predicting commercial construction site accidents. PhD thesis, University of Florida, USA.
Bernold, L E; Lorenc, S J and Davis, M L (2001) Technological intervention to eliminate back injury risks for nailing. Journal of Construction Engineering and Management, 127(3), pp. 245-250. ISSN 0733-9364
Besaiso, H and Fenn, P (2022) How international construction arbitrators make their decisions: Status of commercial norms and international construction law. Journal of Construction Engineering and Management, 148(9): 04022077, ISSN 0733-9364
Besaiso, H; Fenn, P and Emsley, M (2016) Alternative dispute resolution in Palestine: The myth and dilemma of construction mediation. International Journal of Law in the Built Environment, 8(3), pp. 269-286. ISSN 1756-1450
Besaiso, H; Fenn, P; Emsley, M and Wright, D (2018) A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine: A perspective from the industry. Engineering, Construction and Architectural Management, 25(2), pp. 241-256. ISSN 0969-9988
Besiktepe, D (2021) Multi-criteria decision-making approach for building maintenance in facility management. PhD thesis, Colorado State University, USA.
Beynon, K S (2005) Dispute resolution and access to justice, with particular reference to the construction industry in the United Kingdom. PhD thesis, Swansea University, UK.
Bhagat, G and Jha, K N (2023) Stage-wise evaluation of integrity risks in public works procurement in India. International Journal of Construction Management, 23(16), pp. 2818-2829. ISSN 1562-3599
Bhih, M and Hegazy, T (2021) Enhanced but-for method to apportion net delays and accelerations. Journal of Construction Engineering and Management, 147(7): 06021003, ISSN 0733-9364
Birgonul, M T; Dikmen, I and Demirel, T (2005) Decision support tool for the quantification of fault rates in construction fall accidents. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Birgonul, M T and Ozdogan, I D (2001) Risks borne by foreign contractors doing business in Turkey. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Birnie, J W (1993) A behavioural study using decision analysis of building cost prediction by chartered quantity surveyors. PhD thesis, Ulster University, UK.
Blackman, I Q and Picken, D H (2010) Height and construction costs of residential high-rise buildings in Shanghai. Journal of Construction Engineering and Management, 136(11), pp. 1169-1180. ISSN 0733-9364
Blanche, K G (1996) Personal and professional characteristics, perceptions of barriers, and strategies of women in different levels of the superintendency. EdD thesis, University of Maryland, College Park, USA.
Blanke, G and Kotb, S (2015) Construction disputes under UAE law: Some initial considerations. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 269-276. ISSN 17514304
Boamah, F A; Zhang, J and Miah, M H (2023) The impact of tacit knowledge sharing on the success of construction companies operations. Journal of Engineering, Design and Technology, 21(6), pp. 1767-1784. ISSN 1726-0531
Boateng, E B (2021) The role of human safety interventions on co-workers’ safety outcomes in construction projects. PhD thesis, University of Newcastle, Australia.
Bogusz, B (2013) Regulating public/private interests in town and village greens. International Journal of Law in the Built Environment, 5(1), pp. 21-39. ISSN 17561469
Bond, S and Dermisi, S (2017) Using GIS to measure the impact of the Canterbury earthquakes on house prices in Christchurch, NZ. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 123-138. ISSN 1759-5916
Bordass, B; Cohen, R; Standeven, M and Leaman, A (2001) Assessing building performance in use 3: Energy performance of the Probe buildings. Building Research & Information, 29(2), pp. 114-128. ISSN 0961-3218
Bostancioglu, E (2021) Double skin façade assessment by fuzzy AHP and comparison with AHP. Architectural Engineering and Design Management, 17(1-2), pp. 110-130. ISSN 1745-2007
Boudlal, Youssef Ait (2014) Project management and its relation to long-term project success: An empirically based theoretical framework. PhD thesis, University of Louisville, USA.
Bouwer, K A (2016) Building disappointment: the limits and potential of tort liability for energy efficiency problems in domestic buildings. PhD thesis, University College London, UK.
Bouwer, P (2022) A critical appraisal of South Africa's political approach to competition regulation. LLD thesis, University of Pretoria, South Africa.
Bowen, P; Edwards, P and Cattell, K (2015) Perceptions of the relative importance of job control and support factors, as moderators of workplace stress, among South African construction professionals: Preliminary findings. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Bowen, R M (1978) Valuation of capitalized interest on construction expenditures in the electric utility industry. PhD thesis, Stanford University, USA.
Bowes, D (2007) Practitioners' perception of adjudication in UK construction. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Bowes, D (2008) Identifying barriers to the establishment of dispute boards in UK construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Boyacioglu, S E; Greenwood, D; Rogage, K; Gledson, B; Parry, A and Hinds, M (2022) Developing an improved process model for forensic analysis of construction project delays. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Braimah, N (2008) An investigation into the use of construction delay and disruption analysis methodologies. PhD thesis, University of Wolverhampton, UK.
Braimah, N and Ndekugri, I (2009) Consultants' perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. ISSN 0733-9364
Braimah, N; Ndekugri, I and Gameson, R (2007) A systematic methodology for analysing disruption claims. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Branche, C M (1988) An assessment of conditional risks for severe occupational traumatic injury during falls from elevations at work among North Carolina construction workers. PhD thesis, University of North Carolina at Chapel Hill, USA.
Brand, M C and Davenport, P (2011) Proposal for a "dual scheme" model of statutory adjudication for the Australian building and construction industry. International Journal of Law in the Built Environment, 3(3), pp. 252-268. ISSN 1756-1450
Brand, M C and Davenport, P (2012) Adjudication in Australia: An analysis of the amendments introduced by the building and construction industry Security of Payment Amendment Act 2010 (NSW). International Journal of Law in the Built Environment, 4(3), pp. 189-202. ISSN 1756-1469
Brand, M C and Uher, T (2010) Follow-up empirical study of the performance of the New South Wales construction industry security of payment legislation. International Journal of Law in the Built Environment, 2(1), pp. 7-25. ISSN 1756-1450
Brand, M C and Uher, T E (2004) Adjudication determinations in Australia. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Brewster, D (2023) Strategies for reducing employee turnover in the construction industry. DBA thesis, Walden University, USA.
Brilakis, I (2005) Content based integration of construction site images in AEC/FM model based systems. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Britton, P and Bailey, J (2011) New homes and consumer rights: England and Australia compared. International Journal of Law in the Built Environment, 3(3), pp. 269-295. ISSN 1756-1450
Brooker, P (1997) Factors which impact on the choice of alternative dispute resolution in the construction industry. PhD thesis, Oxford Brookes University, UK.
Brooker, P (2009) Criteria for the appropriate use of mediation in construction disputes: Judicial statements in the English technology and construction court. International Journal of Law in the Built Environment, 1(1), pp. 82-97. ISSN 1756-1450
Brooker, P (2011) Towards a code of professional conduct for construction mediators. International Journal of Law in the Built Environment, 3(1), pp. 24-47. ISSN 1756-1450
Brooker, P and Lavers, A (1997) Perceptions of alternative dispute resolution as constraints upon its use in the UK construction industry. Construction Management and Economics, 15(6), pp. 519-526. ISSN 01446193
Brown, D C (2003) Novel method of excavation. Journal of Construction Engineering and Management, 129(2), pp. 222-225. ISSN 0733-9364
Brown, D C (2003) A methodology for selecting the construction team. PhD thesis, University of Southampton, UK.
Brown, R (2009) Legal incoherence and the extra-constitutional law of regulatory takings: The Canadian experience. International Journal of Law in the Built Environment, 1(3), pp. 179-193. ISSN 1756-1450
Bruno, Silvana (2019) The implementation of automatic diagnostics and monitoring towards diagnosis-aided historic building information modelling and management. PhD thesis, Politecnico di Bari, Italy.
Bröchner, J; Josephson, P E and Kadefors, A (2002) Swedish construction culture, quality management and collaborative practice. Building Research & Information, 30(6), pp. 392-400. ISSN 0961-3218
Bubshait, A A and Cunningham, M J (1998) Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), pp. 315-322. ISSN 0733-9364
Budawara, N (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University, Canada.
Buonocore, C; Castro, L; De Vecchi, R; Lamberts, R and Güths, S (2025) Natural ventilation in Brazilian homes: Depicting perceptions, usage patterns and motivations in a questionnaire survey. Building Research & Information, 53(1-2), pp. 40-55. ISSN 0961-3218
Burrell, P A (2017) Structural errors and failures in construction: is knowledge hidden? PhD thesis, Anglia Ruskin University, UK.
Burrus, R T; Dumas, C F and Graham, J E (2011) Hurricane risk and coastal property owner choices. International Journal of Disaster Resilience in the Built Environment, 2(2), pp. 118-138. ISSN 1759-5916
Caiden, D (2017) Engineering expert witness work: What the lawyers require. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 181-185. ISSN 17514304
Cakmak, P I (2022) The stakeholders' perspective on the factors contributing to construction disputes. International Journal of Building Pathology and Adaptation, 40(5), pp. 712-727. ISSN 23984708
Calle Muller, C and ElZomor, M (2025) The role of disruptive technologies in enhancing disaster response and resilience in low-income communities. International Journal of Disaster Resilience in the Built Environment, 16(5), pp. 604-619. ISSN 1759-5908
Campbell, A J (2012) The politics of canal construction: the Ashby Canal, 1781-1804. PhD thesis, University of Leicester, UK.
Campbell, J M and Smith, S D (2007) Safety, hazard and risk identification and management in infrastructure management: A project overview. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Candaş, A B (2022) Multipurpose semantic analysis of construction text documentation. PhD thesis, Middle East Technical University, Turkey.
Candaş, A B and Tokdemir, O B (2022) Automated identification of vagueness in the FIDIC silver book conditions of contract. Journal of Construction Engineering and Management, 148(4): 04022007, ISSN 0733-9364
Cao, N and Cheung, S O (2024) Voluntary mediation as a tenable resolution mechanism for construction disputes. Journal of Construction Engineering and Management, 150(6): 04024046, ISSN 0733-9364
Cao, N and Cheung, S O (2025) The value of voluntary participation in construction dispute mediation. Engineering, Construction and Architectural Management, 32(2), pp. 1229-1253. ISSN 0969-9988
Cao, T and Yan, L (2025) The role of contract flexibility in shaping contractor behaviour: A parallel mediation analysis of trust and control. Construction Management and Economics, 43(9), pp. 685-703. ISSN 0144-6193
Capper, P N (1995) The adjudicator under NEC 2nd edition: A new approach to disputes. Engineering, Construction and Architectural Management, 2(4), pp. 317-326. ISSN 0969-9988
Carmichael, D G and Karantonis, J P (2015) Construction contracts with conversion capability: A way forward. Journal of Financial Management of Property and Construction, 20(2), pp. 132-146. ISSN 1366-4387
Carmo, Lie Uema do (2012) Construction contracts of large projects. PhD thesis, Universidade de São Paulo, Brazil.
Carty, G J (1995) Construction. Journal of Construction Engineering and Management, 121(3), pp. 319-328. ISSN 0733-9364
Casady, C B and Baxter, D (2020) Pandemics, public-private partnerships (PPPs), and force majeure: COVID-19 expectations and implications. Construction Management and Economics, 38(12), pp. 1077-1085. ISSN 01446193
Cassar, R and Martin, H (2016) How to choose a project manager under uncertainty. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Castaneda-Maza, J A (2002) Workers' skills and receptiveness to operate under the Tier II construction management strategy. PhD thesis, University of Texas at Austin, USA.
Castañeda, J A; Tucker, R L and Haas, C T (2005) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Journal of Construction Engineering and Management, 131(7), pp. 799-807. ISSN 0733-9364
Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(1), pp. 81-92. ISSN 1466433X
Cattell, K; Bowen, P and Edwards, P (2016) Stress among South African construction professionals: A job demand-control-support survey. Construction Management and Economics, 34(10), pp. 700-723. ISSN 01446193
Caven, V and Diop, M (2012) Architecture: A 'rewarding' career? An Anglo-French comparative study of intrinsic rewards in the architecture profession. Construction Management and Economics, 30(7), pp. 513-523. ISSN 1466433X
Cecilia, M M (2016) Requirements for the effective statutory adjudication practice in the South African construction industry. PhD thesis, University of Pretoria, South Africa.
Cevikbas, M; Okudan, O and Işık, Z (2024) Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering, Construction and Architectural Management, 31(1), pp. 1-27. ISSN 0969-9988
Chakhrit, A and Chennoufi, M (2023) Failure mode, effects and criticality analysis improvement by using new criticality assessment and prioritization based approach. Journal of Engineering, Design and Technology, 21(5), pp. 1545-1567. ISSN 1726-0531
Chakravarty, S (2002) Essays on contracting in the construction industry. PhD thesis, University of Southern California, USA.
Chalkey, K and Green, M (2016) In the context of mediation, is safeguarding mediator neutrality and party autonomy more important than ensuring a fair settlement? International Journal of Law in the Built Environment, 8(2), pp. 161-175. ISSN 1756-1450
Chammout, B; El-Adaway, I H; Abdul Nabi, M and Assaad, R H (2024) Price escalation in construction projects: Examining national and international contracts. Journal of Construction Engineering and Management, 150(9): 04024109, ISSN 0733-9364
Champion, R (2011) A consideration of recovery of prolongation costs in a construction context. International Journal of Law in the Built Environment, 3(3), pp. 237-251. ISSN 1756-1450
Chan, A P C; Chan, D W M; Chiang, Y H; Tang, B S; Chan, E H W and Ho, K S K (2004) Exploring critical success factors for partnering in construction projects. Journal of Construction Engineering and Management, 130(2), pp. 188-198. ISSN 0733-9364
Chan, C F P (2001) The development of construction law in singapore. PhD thesis, University of London, UK.
Chan, C H F (2010) To talk or to fight? Collective effects of strategic, cultural, and institutional factors on investors' renegotiation approach in public-private concessions. PhD thesis, Stanford University, USA.
Chan, E H W (1997) Amicable dispute resolution in the people's republic of China and its implications for foreign-related construction disputes. Construction Management and Economics, 15(6), pp. 539-548. ISSN 01446193
Chan, E H W; Suen, H C H and Chan, C K L (2006) Maut-based dispute resolution selection model prototype for international construction projects. Journal of Construction Engineering and Management, 132(5), pp. 444-451. ISSN 0733-9364
Chan, E H W and Tse, R Y C (2003) Cultural considerations in international construction contracts. Journal of Construction Engineering and Management, 129(4), pp. 375-381. ISSN 0733-9364
Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chan, H-W E (2003) A study of factors relevant to disputes arising in international construction projects involving both European and Asian cultural factors. PhD thesis, King's College London, UK.
Chan, Hon-Wan Edwin (2003) A study of contractual provisions relevant to disputes arising in international construction projects involving both European and East Asian cultural factors. PhD thesis, King's College London (University of London), UK.
Chan, M-W (1997) The relationship between project funding and construction systems. PhD thesis, University of Hong Kong, Hong Kong.
Chan, W T P (2009) Construction industry development and government policy. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chandra, Venny (2007) An investigation of cultural learning during the hospital process from a facilities management perspective. PhD thesis, University of New South Wales, Australia.
Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364
Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Chang, S H (2013) Evaluating essential liabilities on design professionals under earthquake's impact: Taiwan experience. Engineering, Construction and Architectural Management, 20(2), pp. 181-194. ISSN 0969-9988
Chaphalkar, N and Iyer, K C (2014) Factors influencing decisions on delay claims in construction contracts for Indian scenario. Construction Economics and Building, 14(1), pp. 32-44. ISSN 2204-9029
Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts. PhD thesis, Indian Institute of Technology Delhi, India.
Chapman, M (2016) Litigation following UK Water Resources Act section 110 appeal. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 85-90. ISSN 17514304
Chapman, M L (2011) First ever appeal under section 110 of the uk water resources act 1991. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 203-208. ISSN 17514304
Chapman, P H J (2009) Dispute boards on major infrastructure projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 7-16. ISSN 17514312
Charlie, W A; Osman, M A and Ali, E M (1984) Construction on expansive soils in Sudan. Journal of Construction Engineering and Management, 110(3), pp. 359-374. ISSN 0733-9364
Charlson, J (2014) Law for engineering undergraduates on accredited courses 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), pp. 201-206. ISSN 17514304
Charlson, J (2021) Emerging trends in construction law at the confluence of academia and industry. PhD thesis, University of Wolverhampton, UK.
Charlson, J; Baldwin, R and Harrison, J (2014) Early perceptions of allowing adjudication of oral contracts. International Journal of Law in the Built Environment, 6(3), pp. 233-249. ISSN 1756-1450
Charlson, J and Oduoza, C (2014) Legal risk identification for SMEs in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Chen, C (2007) Institutional barriers to private participation in infrastructure: The case of electronic toll collection in Taiwan. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Chen, C (2015) A proactive approach for change management and control on construction projects. PhD thesis, University of California, Berkeley, USA.
Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: A comparative perspective. Construction Management and Economics, 23(9), pp. 913-925. ISSN 01446193
Chen, H (2006) Exploring the relationships between influencing factors and performance for construction joint ventures. PhD thesis, University of Hong Kong, Hong Kong.
Chen, J-H (2003) Litigation prediction model for construction disputes caused by change orders. PhD thesis, University of Wisconsin - Madison, USA.
Chen, K and Lu, W (2019) Bridging BIM and building (BBB) for information management in construction: The underlying mechanism and implementation. Engineering, Construction and Architectural Management, 26(7), pp. 1518-1532. ISSN 0969-9988
Chen, L (2019) An integrated construction schedule risk analysis approach for infrastructure projects under uncertainty. PhD thesis, University of Hong Kong, Hong Kong.
Chen, N (2017) An investigation of the influence of project complexity on communications in engineering construction projects. PhD thesis, University of Hong Kong, Hong Kong.
Chen, Q and Jin, R (2012) Safety4site commitment to enhance jobsite safety management and performance. Journal of Construction Engineering and Management, 138(4), pp. 509-519. ISSN 0733-9364
Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.
Chen, X; Ding, Y; Cory, C A; Hu, Y; Wu, K J and Feng, X (2021) A decision support model for subcontractor selection using a hybrid approach of QFD and AHP-improved grey correlation analysis. Engineering, Construction and Architectural Management, 28(6), pp. 1780-1806. ISSN 0969-9988
Chen, X; Feng, J; Zhao, Y and Lu, T (2025) Feasibility of a program delay claims scheme: Synergistic effect and risk-cost optimization. Journal of Construction Engineering and Management, 151(10): 04025151, ISSN 0733-9364
Chen, Y; Yang, Z; Liu, B; Wang, D; Xiao, Y and Wang, A (2024) How cultural intelligence affects expatriate effectiveness in international construction projects. Engineering, Construction and Architectural Management, 31(4), pp. 1696-1714. ISSN 0969-9988
Cheng, E W L; Li, H and Fox, P (2007) Job performance dimensions for improving final project outcomes. Journal of Construction Engineering and Management, 133(8), pp. 592-599. ISSN 0733-9364
Cheng, M; Liu, G and Xu, Y (2021) Can joint-contract functions promote PPP project sustainability performance? A moderated mediation model. Engineering, Construction and Architectural Management, 28(9), pp. 2667-2689. ISSN 0969-9988
Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364
Chetwin, M (2011) Comparative analysis of some aspects of assessment of damages for contractual breaches in England and Wales, Australia and New Zealand. International Journal of Law in the Built Environment, 3(2), pp. 113-125. ISSN 1756-1450
Cheung, C M; Bowen, P; Cattell, K and Davis, J (2020) Construction professionals' commitment to the organisation, work-life balance, and well-being. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Cheung, S O and Chow, P T (2011) Withdrawal in construction project dispute negotiation. Journal of Construction Engineering and Management, 137(12), pp. 1071-1079. ISSN 0733-9364
Cheung, S O; Chow, P T and Yiu, T W (2009) Contingent use of negotiators' tactics in construction dispute negotiation. Journal of Construction Engineering and Management, 135(6), pp. 466-476. ISSN 0733-9364
Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(2), pp. 321-348. ISSN 0969-9988
Cheung, S O; Lyeung, D K; Cheung, F K T and Suen, H C H (2002) A planning framework for conditions of contract for use in partnering projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Cheung, S O; Ng, S T; Lam, K C and Sin, W S (2001) A fuzzy sets model for construction dispute evaluation. Construction Innovation, 1(2), pp. 117-127. ISSN 1471-4175
Cheung, S O and Pang, K H Y (2013) Anatomy of construction disputes. Journal of Construction Engineering and Management, 139(1), pp. 15-23. ISSN 0733-9364
Cheung, S O and Suen, H C H (2002) A multi-attribute utility model for dispute resolution strategy selection. Construction Management and Economics, 20(7), pp. 557-568. ISSN 01446193
Cheung, S O; Suen, H C H and Lam, T I (2002) Fundamentals of alternative dispute resolution processes in construction. Journal of Construction Engineering and Management, 128(5), pp. 409-417. ISSN 0733-9364
Cheung, S O; Tam, C M; Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(3), pp. 281-294. ISSN 01446193
Cheung, S O; Yiu, K T W and Suen, H (2004) Construction negotiation online. Journal of Construction Engineering and Management, 130(6), pp. 844-852. ISSN 0733-9364
Cheung, S O; Yiu, T W and Chan, H W (2010) Exploring the potential for predicting project dispute resolution satisfaction using logistic regression. Journal of Construction Engineering and Management, 136(5), pp. 508-517. ISSN 0733-9364
Cheung, S O; Yiu, T W and Lam, M C (2013) Interweaving trust and communication with project performance. Journal of Construction Engineering and Management, 139(8), pp. 941-950. ISSN 0733-9364
Cheung, S O; Yiu, T W Y and Yeung, S F (2006) A study of styles and outcomes in construction dispute negotiation. Journal of Construction Engineering and Management, 132(8), pp. 805-814. ISSN 0733-9364
Cheung, S O; Zhu, L and Yu, K I (2022) The value of apology in construction dispute negotiation. International Journal of Construction Management, 22(10), pp. 1910-1923. ISSN 1562-3599
Cheung, S-O (1997) Risk allocation: an essential tool for construction project management. Journal of Construction Procurement, 3(1), pp. 16-27. ISSN 1358-9180
Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.
Chi, C S-F (2010) How host country and transnational institutions interact on international infrastructure projects in less developed countries: Case studies of high-speed rail projects in China and Taiwan. PhD thesis, Stanford University, USA.
Chi Man Hui, E; Omar, I and Ismail, M (2009) Kotaka's model in land acquisition for infrastructure provision in Malaysia. Journal of Financial Management of Property and Construction, 14(3), pp. 194-207. ISSN 1366-4387
Chiba, Y; Prabhakar, S V R K; Islam, M A and Akber, M A (2018) Priority practices for addressing non-economic loss and damages caused by cyclones in Bangladesh: Case study of Koyra. International Journal of Disaster Resilience in the Built Environment, 9(4-5), pp. 333-347. ISSN 1759-5916
Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.
Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.
Chinyio, E; Gameson, R and Suresh, S (2011) The management of construction stakeholders by higher education institutions (HEIs) in the United Kingdom (UK): A pilot study. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Chinyio, E; Suresh, S and Salisu, J B (2018) The impacts of monetary rewards on public sector employees in construction: A case of Jigawa State in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 125-142.
Chiu, W-Y B (2011) Job satisfaction and organizational commitment amongst quantity surveyors in Hong Kong: an attitudinal perspective. PhD thesis, University of Hong Kong, Hong Kong.
Cho, W M and Hadikusumo, B H W (2024) Psychological contract between contractors and owners in construction projects: The mediating role of inter-organisational teamwork. Engineering, Construction and Architectural Management, 31(10), pp. 4001-4015. ISSN 0969-9988
Choi, H H; Cho, H N and Seo, J W (2004) Risk assessment methodology for underground construction projects. Journal of Construction Engineering and Management, 130(2), pp. 258-272. ISSN 0733-9364
Chong, H Y and Zin, R M (2012) Selection of dispute resolution methods: Factor analysis approach. Engineering, Construction and Architectural Management, 19(4), pp. 428-443. ISSN 0969-9988
Chong, H Y; Zin, R M and Chong, S C (2013) Employing data warehousing for contract administration: E-dispute resolution prototype. Journal of Construction Engineering and Management, 139(6), pp. 611-619. ISSN 0733-9364
Chong, H-Y and Oon, C K (2016) A practical approach in clarifying legal drafting: Delphi and case study in Malaysia. Engineering, Construction and Architectural Management, 23(5), pp. 610-621. ISSN 0969-9988
Chovichien, V and Suriyanon, N (2011) Attitudes of people in the Thai construction industry sector on issues related to delay in the approval of submittals. Journal of Construction in Developing Countries, 16(1), pp. 41-67. ISSN 1823-6499
Chow, L K and Ng, S T (2010) Delineating the performance standards of engineering consultants at design stage. Construction Management and Economics, 28(1), pp. 3-11. ISSN 1466433X
Chow, P T; Kong, F and Cheung, S O (2012) Mediating and moderating effect of tension on withdrawal-commitment relationship in construction dispute negotiation. Journal of Construction Engineering and Management, 138(10), pp. 1230-1238. ISSN 0733-9364
Christudason, A; Kenna, P; Amann, W and Mundt, A (2010) Designing a new rental housing law for Romania. International Journal of Law in the Built Environment, 2(2), pp. 157-177. ISSN 1756-1450
Christudason, A; Kenna, P and Ball, J (2010) Using banks: The effect of national attitudes to public intervention in mortgage lending and eviction in French and English law. International Journal of Law in the Built Environment, 2(2), pp. 118-137. ISSN 1756-1450
Chung, J H (2015) Optimizing financial structure of transportation public-private partnership infrastructure projects based on traffic revenue risks: Case study of US DBFOM project. PhD thesis, University of Florida, USA.
Close R, L M (2013) Community consultation during construction: Attitudes, experiences and skills. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Coelho Maran, A C (2010) Multicriteria decision support system to delineate water resources planning and management regions. PhD thesis, Colorado State University, USA.
Coggins, J (2011) From disparity to harmonisation of construction industry payment legislation in Australia: A proposal for a dual process of adjudication based upon size of progress payment claim. Construction Economics and Building, 11(2), pp. 34-59. ISSN 2204-9029
Coggins, J; Elliott, R F and Bell, M (2010) Towards harmonisation of construction industry payment legislation: A consideration of the success afforded by the East and West coast models in Australia. Construction Economics and Building, 10(3), pp. 14-35. ISSN 2204-9029
Coggins, J and O’Leary, T (2008) The validity of adjudicators' determinations containing errors of law: The NSW judicial approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Coggins, J K and Donohoe, S (2012) The validity of adjudicators' determinations containing errors of law: A comparison of the judicial approach in England and New South Wales. International Journal of Law in the Built Environment, 4(2), pp. 116-125. ISSN 1756-1450
Coggins, Jeremy Keith (2012) A proposal for harmonisation of security of payment legislation in the Australian building and construction industry. PhD thesis, University of Adelaide, Australia.
Col Debella, D and Ries, R (2006) Construction delivery systems: A comparative analysis of their performance within school districts. Journal of Construction Engineering and Management, 132(11), pp. 1131-1138. ISSN 0733-9364
Cole, R J and Mitchell, L (1999) Customizing and using GBTool: Two case-study projects. Building Research & Information, 27(4-5), pp. 257-275. ISSN 0961-3218
Coleman, C E; Mwanaumo, E M; Muya, M and Rahman, R A (2025) Financial challenges leading to premature contract termination in Ghanaian construction industry: Causes and mitigation strategies. Journal of Construction Business and Management, 7(2), pp. 45-66.
Cong, W; Goh, Y M; Zhang, S; Liang, H; Zhou, Z and Guo, N (2023) Linking leader-member exchange and informal safety communication of construction workers in China: A cognitive psychology perspective. Journal of Construction Engineering and Management, 149(10): 04023092, ISSN 0733-9364
Cong, X; Wang, L; Ma, L and Skibnewski, M (2021) Exploring critical influencing factors for the site selection failure of waste-to-energy projects in China caused by the "not in my back yard" effect. Engineering, Construction and Architectural Management, 28(6), pp. 1561-1592. ISSN 0969-9988
Connell, A and Mason, J (2014) Isn't all loss consequential? A review of recent case law and its relevance to contractual practices within the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Connell, A and Mason, J (2015) Isn't all loss consequential? A review of recent case law and its relevance to contractual practices within the built environment. International Journal of Law in the Built Environment, 7(3), pp. 176-194. ISSN 1756-1450
Cooke, John Richard (1973) Methods of documentation and administration of building contracts. PhD thesis, University of New South Wales, Australia.
Coolican, Alice Maeve (1989) A history of industrial relations in the Sydney building trades, 1870-1914. PhD thesis, University of New South Wales, Australia.
Coombe-Davies, M (1985) The laws on contract liability as they specifically relate to architectural practice. PhD thesis, University College Cardiff, UK.
Cooper, T E (1994) A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document. PhD thesis, Auburn University, USA.
Coopman, J T (1998) Superintendent motivation and satisfaction related to the use of construction management for school facility projects. EdD thesis, Ball State University, USA.
Costa, A C B (2014) The effects of organizational justice and exercise on the relationship between job stressors and employee health. PhD thesis, Portland State University, USA.
Costa, M and Lisboa, I (2023) Default prediction of small and medium enterprises: Portuguese construction sector. Journal of Financial Management of Property and Construction, 28(3), pp. 439-458. ISSN 1366-4387
Craig, R (1999) How innovative is the common law of tendering? Journal of Construction Procurement, 5(1), pp. 15-26. ISSN 1358-9180
Craig, R W (2000) Controversial aspects of Commonwealth Construction and Engineering Procurement Law. PhD thesis, Loughborough University, UK.
Craig, R W and Barnes, W C (2007) Professional employees' exposure to risk of negligence claims from the client. Construction Management and Economics, 25(7), pp. 811-819. ISSN 1466433X
Crawley, S E (2017) The difference in how UAE and EW law controls Gharar (risk) and so Riba in a construction contract in the Emirate of Dubai, UAE. PhD thesis, Robert Gordon University, UK.
Cuervo, J C and Pheng, L S (2005) Significance of internalization factors for Singapore transnational construction corporations. Construction Management and Economics, 23(2), pp. 147-162. ISSN 01446193
Cui, Q; Davis, J S and Huang, H (2016) How happy are project managers in their jobs. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Dagenais, D A (2007) Introduction to good faith in construction contracts. Construction Management and Economics, 25(7), pp. 715-721. ISSN 1466433X
Dalal, J; Mohapatra, P K J and Mitra, G C (2010) Prioritization of rural roads: AHP in group decision. Engineering, Construction and Architectural Management, 17(2), pp. 135-158. ISSN 0969-9988
Dallı, M and Soyluk, A (2024) Ethical analysis of architecture on structural irregularities in major earthquakes in Turkey. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 259-273. ISSN 1759-5916
Dansoh, A; Frimpong, S; Ampratwum, G; Dennis Oppong, G and Osei-Kyei, R (2020) Exploring the role of traditional authorities in managing the public as stakeholders on PPP projects: A case study. International Journal of Construction Management, 20(6), pp. 628-641. ISSN 1562-3599
Daoud, A. O.; Lal, R.; Gouda Mohamed, A.; Mohamed, M. and Wefki, H. (2026) An implementation framework for blockchain and smart contracts adoption in the egyptian construction sector. International Journal of Construction Management, 26(9), pp. 1707-1726. ISSN 1562-3599
Daoud, O E K (1997) The architect/engineer's role in rehabilitation work. Journal of Construction Engineering and Management, 123(1), pp. 1-5. ISSN 0733-9364
Darragh, A J R (2001) Patterns of injury among residential construction workers before and after a safety intervention program, 1994-1998. PhD thesis, Colorado State University, USA.
Davenport, P and Brand, M C (2013) The effectiveness of time bar clauses following the high court in decision in Andrews v. Australia and New Zealand Banking Group. International Journal of Law in the Built Environment, 5(3), pp. 241-252. ISSN 17561469
Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.
Davis, B L (2024) State-legalized marijuana: The effects on construction safety. PhD thesis, Capitol Technology University, USA.
Davis, K; Ledbetter, W B and Burati, J L (1989) Measuring design and construction quality costs. Journal of Construction Engineering and Management, 115(3), pp. 385-400. ISSN 0733-9364
Dawson, P J (1997) A hierarchical approach to the management of construction project risk. PhD thesis, University of Nottingham, UK.
Dağkıran, G (2015) A multi agent risk analysis and sharing platform for international construction projects. PhD thesis, Middle East Technical University, Turkey.
De Asís Ramírez, F; Seco, A and Miqueleiz, L (2013) The arbitration process in civil engineering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 43-46. ISSN 17514304
De Jarnette, V; McCarthy, L M; Bennert, T and Guercio, M C (2013) Use of mechanistic-empirical pavement design principles to assign asphalt pavement pay factor adjustments. Journal of Construction Engineering and Management, 139(11): 4013024, ISSN 0733-9364
De La Garza, J M; Prateapusanond, A and Ambani, N (2007) Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11), pp. 836-845. ISSN 0733-9364
De Marco, A and Mangano, G (2013) Risk and value in privately financed health care projects. Journal of Construction Engineering and Management, 139(8), pp. 918-926. ISSN 0733-9364
De Saram, D D and Tang, S L (2005) Pain and suffering costs of persons in construction accidents: Hong Kong experience. Construction Management and Economics, 23(6), pp. 645-658. ISSN 01446193
De Silva, N; Rathnayake, U and Kulasekera, K M U B (2018) Under-reporting of construction accidents in Sri Lanka. Journal of Engineering, Design and Technology, 16(6), pp. 850-868. ISSN 1726-0531
Deacon, H A and Kajimo-Shakantu, K (2024) The prevalence of claims under the JBCC principal building agreement in South Africa. International Journal of Construction Management, 24(3), pp. 331-338. ISSN 1562-3599
Decarolis, F (2009) When the highest bidder loses the auction: Theory and evidence from public procurement. PhD thesis, University of Chicago, USA.
Delghust, M; Roelens, W; Tanghe, T; De Weerdt, Y and Janssens, A (2015) Regulatory energy calculations versus real energy use in high-performance houses. Building Research & Information, 43(6), pp. 675-690. ISSN 0961-3218
Deltas, G M (1996) Essays in auctions and procurement: An analysis of bidding rings, left bids, stochastic properties of winning bids, and two step structural estimators of bidding for contracts. PhD thesis, Yale University, USA.
Deng, X (2008) Research on agent construction management mode and principal-agent relationship. PhD thesis, Wuhan University, China.
Dhaenens, A; Zheng, W; Sanders, K and Sumelius, J (2026) Mind the gap: Employee work arrangements, work-family balance satisfaction, and turnover in international property development. Journal of Construction Engineering and Management, 152(1): 04025231, ISSN 0733-9364
Diab, M F (2011) Analyses of highway project construction risks, performance, and contingency. PhD thesis, North Dakota State University, USA.
Diekmann, J E and Featherman, W D (1998) Assessing cost uncertainty: Lessons from environmental restoration projects. Journal of Construction Engineering and Management, 124(6), pp. 445-451. ISSN 0733-9364
Diekmann, J E and Girard, M J (1995) Are contract disputes predictable? Journal of Construction Engineering and Management, 121(4), pp. 355-363. ISSN 0733-9364
Diekmann, J E and Kim, M P (1992) Superchange: Expert system for analysis of changes claims. Journal of Construction Engineering and Management, 118(2), pp. 399-411. ISSN 0733-9364
Diekmann, J E and Nelson, M C (1985) Construction claims: Frequency and severity. Journal of Construction Engineering and Management, 111(1), pp. 74-81. ISSN 0733-9364
Dikmen, I; Birgonul, M T; Ozorhon, B and Eren, K (2008) Critical success factors for partnering in the Turkish construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Ding, G (2013) Demolish or refurbish: environmental benefits of housing conservation. Construction Economics and Building, 13(2), pp. 18-34. ISSN 2204-9029
Ding, G and Forsythe, P J (2013) Sustainable construction: Life cycle energy analysis of construction on sloping sites for residential buildings. Construction Management and Economics, 31(3), pp. 254-265. ISSN 1466433X
Ding, Z; Ng, F F and Wang, J (2013) The mediation role of trust in knowledge sharing a cognitive perspective in Chinese architectural design teams. Engineering, Construction and Architectural Management, 20(6), pp. 604-619. ISSN 0969-9988
Ding, Z; Nie, W; Tam, V W Y and Illankoon, C (2025) Consumer purchase intention for extrinsic and intrinsic cues of construction and demolition waste recycled products. Engineering, Construction and Architectural Management, 32(6), pp. 3565-3586. ISSN 0969-9988
Dithebe, K; Thwala, W D D; Aigbavboa, C O; Edwards, D J; Hayhow, S and Talebi, S (2023) Stakeholder management in the alleviation of legal and regulatory disputes in public-private partnership projects in South Africa. Journal of Engineering, Design and Technology, 21(2), pp. 325-342. ISSN 1726-0531
Dixon, M (2013) Title by registration or conquest: Interpreting the Land Registration Act 2002 in England and Wales. International Journal of Law in the Built Environment, 5(3), pp. 194-206. ISSN 17561469
Do, Q; Moriyani, M A; Le, C and Le, T (2023) Cost-weighted tf-idf: A novel approach for measuring highway project similarity based on pay items' cost composition and term frequency. Journal of Construction Engineering and Management, 149(8): 04023069, ISSN 0733-9364
Do, S T; Nguyen, V T and Nguyen, N H (2023) Relationship networks between variation orders and claims/disputes causes on construction project performance and stakeholder performance. Engineering, Construction and Architectural Management, 30(9), pp. 3817-3839. ISSN 0969-9988
Dodanwala, T C and Santoso, D S (2022) The mediating role of job stress on the relationship between job satisfaction facets and turnover intention of the construction professionals. Engineering, Construction and Architectural Management, 29(4), pp. 1777-1796. ISSN 0969-9988
Dodanwala, T C; Santoso, D S and Yukongdi, V (2023) Examining work role stressors, job satisfaction, job stress, and turnover intention of sri lanka's construction industry. International Journal of Construction Management, 23(15), pp. 2583-2592. ISSN 1562-3599
Doherty, M M (2022) Exploring the expansion of planners' engagement capabilities via accessing the data from a building information model for public consultation. PhD thesis, Northumbria University, UK.
Doloi, H (2009) Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), pp. 1245-1263. ISSN 1466433X
Doloi, H (2010) Benchmarking a new design management system using process simulation approach. Construction Innovation, 10(1), pp. 42-59. ISSN 1471-4175
Dominguez, D (2008) Handling future uncertainty: Strategic planning for the infrastructure sector. DSc thesis, ETH Zürich, Switzerland.
Dong, F (2010) Essays in advanced risk management and quantitative strategies in infrastructure finance. PhD thesis, Columbia University, USA.
Donohoe, S and Brooks, L (2007) Reflections on construction management procurement following Great Eastern Hotel company v. John laing. Construction Management and Economics, 25(7), pp. 701-708. ISSN 1466433X
Donohoe, S and Coggins, J (2011) Liquidated damages in construction contracts: Is there a schism between the Australian and English courts? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Dorée, A G (1997) Construction procurement by Dutch municipalities. Journal of Construction Procurement, 3(3), pp. 78-88. ISSN 1358-9180
Dorée, A G (2004) Collusion in the Dutch construction industry: An industrial organization perspective. Building Research & Information, 32(2), pp. 146-156. ISSN 0961-3218
Douglas, J C (1994) Aesthetic-based conflict in highway planning: Federal highway administration putting planners at risk. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Doukakis, J P (2024) A case study of a mechanics of solids course in civil engineering education. PhD thesis, Rutgers The State University of New Jersey, USA.
Du, J; El-Gafy, M and Zhao, D (2016) Optimization of change order management process with object-oriented discrete event simulation: Case study. Journal of Construction Engineering and Management, 142(4): 05015018, ISSN 0733-9364
Duffy, F and Rabeneck, A (2013) Professionalism and architects in the 21st century. Building Research & Information, 41(1), pp. 115-122. ISSN 0961-3218
Dulung, A Z A (2007) Computer aided decision support system for the selection of subcontractors in building refurbishment works. PhD thesis, National University of Singapore, Singapore.
Duodu, B.; Nduro, E. and Rowlinson, S. (2026) Enhancing construction contracting firm performance through external knowledge sourcing: Is innovation the "black box"? Journal of Engineering, Design and Technology, 24(1), pp. 193-212. ISSN 1726-0531
Durdyev, S; Mohandes, S R; Mahdiyar, A and Ismail, S (2022) What drives clients to purchase green building? The cybernetic fuzzy analytic hierarchy process approach. Engineering, Construction and Architectural Management, 29(10), pp. 4015-4039. ISSN 0969-9988
Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.
Edirisinghe, V R D (2023) Framework for improved alternatives dispute resolution practice in the Sri Lankan constructions industry. PhD thesis, Liverpool John Moores University, UK.
Ehoff Jr., C E (1992) Removed from scheduled maintenance: An inquiry into the problems threatening the survival of United States elevator manufacturers. PhD thesis, Golden Gate University, USA.
Eisenberg, D A (2018) How to think about resilient infrastructure systems. PhD thesis, Arizona State University, USA.
Ekanayake, E M K and Perera, B A K S (2016) Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka. Built Environment Project and Asset Management, 6(5), pp. 521-534. ISSN 2044-124X
Ekstrom, M A (2002) Accounting for rater credibility when evaluating construction industry service providers. PhD thesis, Stanford University, USA.
El Asmar, M (2012) Modeling and benchmarking performance for the integrated project delivery (IPD) system. PhD thesis, University of Wisconsin - Madison, USA.
El-Adaway, I H; Abotaleb, I S; Eid, M S; May, S; Netherton, L and Vest, J (2018) Contract administration guidelines for public infrastructure projects in the United States and Saudi Arabia: Comparative analysis approach. Journal of Construction Engineering and Management, 144(6): 04018031, ISSN 0733-9364
El-Adaway, I H and Kandil, A A (2009) Contractors' claims insurance: A risk retention approach. Journal of Construction Engineering and Management, 135(9), pp. 819-825. ISSN 0733-9364
El-Adaway, I H and Kandil, A A (2010) Multiagent system for construction dispute resolution (MAS-COR). Journal of Construction Engineering and Management, 136(3), pp. 303-315. ISSN 0733-9364
El-Hasia, A M (2005) The effects of state's construction procurement policy implementation on the outcome of local construction projects: the Libyan case. PhD thesis, University of Salford, UK.
El-Rasas, T and Marzouk, M (2020) Fuzzy model for assessing delays in Egyptian residential projects. Journal of Financial Management of Property and Construction, 25(2), pp. 225-246. ISSN 1366-4387
El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling. PhD thesis, Iowa State University, USA.
Elazhary, M. and El-Adaway, I. H. (2026) Managing risks under nuclear power plant projects: A latent similarity-guided contract customization. Journal of Construction Engineering and Management, 152(7): 04026089, ISSN 0733-9364
Elbarkouky, M M G; Fayek, A R; Siraj, N B and Sadeghi, N (2016) Fuzzy arithmetic risk analysis approach to determine construction project contingency. Journal of Construction Engineering and Management, 142(12): 04016070, ISSN 0733-9364
Elder, John (2007) The history of the master builders association of NSW: The first hundred years. PhD thesis, University of Sydney, Australia.
Eldin, N N and Egger, S (1990) Productivity improvement tool: Camcorders. Journal of Construction Engineering and Management, 116(1), pp. 100-111. ISSN 0733-9364
Elghaish, F and Abrishami, S (2021) A centralised cost management system: Exploiting EVM and abc within IPD. Engineering, Construction and Architectural Management, 28(2), pp. 549-569. ISSN 0969-9988
Elghaish, F; Abrishami, S; Hosseini, M R and Abu-Samra, S (2020) Revolutionising cost structure for integrated project delivery: A BIM-based solution. Engineering, Construction and Architectural Management, 28(4), pp. 1214-1240. ISSN 0969-9988
Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.
Elhag, T; Eapen, S and Ballal, T (2020) Moderating claims and disputes through collaborative procurement. Construction Innovation, 20(1), pp. 79-95. ISSN 1471-4175
Elmarsafi, G M (2008) Interorganizational collaboration: Transformation strategies to reduce construction disputes in the construction industry. PhD thesis, Capella University, USA.
Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.
Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.
English, J and Abrahams, S (2015) Inclusion of HIV/AIDS awareness in core curricula for construction economics and management students. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Eom, C S J and Paek, J H (2009) Risk index model for minimizing environmental disputes in construction. Journal of Construction Engineering and Management, 135(1), pp. 34-41. ISSN 0733-9364
Ercan, T (2019) New three-part model of innovation activity in construction companies. Journal of Construction Engineering and Management, 145(5): 04019022, ISSN 0733-9364
Erdis, E; Genç, O and Aydınlı, S (2021) Mobbing on construction professionals: Causes, consequences, and precautions. International Journal of Construction Management, 21(10), pp. 987-996. ISSN 1562-3599
Erfani, A (2023) Data-driven risk modeling for infrastructure projects using artificial intelligence techniques. PhD thesis, University of Maryland, College Park, USA.
Erfani, A; Ma, Z; Cui, Q and Baecher, G B (2023) Ex post project risk assessment: Method and empirical study. Journal of Construction Engineering and Management, 149(2): 04022174, ISSN 0733-9364
Erikson, C A (1979) Risk sharing in construction contracts. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Eriksson, P E (2010) Partnering: What is it, when should it be used, and how should it be implemented? Construction Management and Economics, 28(9), pp. 905-917. ISSN 1466433X
Eriksson, P E and Pesämaa, O (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(8), pp. 893-901. ISSN 1466433X
Eriksson, T and Kadefors, A (2012) Trust, control and knowledge integration in a rock tunnel project. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Espada, R; Apan, A and McDougall, K (2017) Vulnerability assessment of urban community and critical infrastructures for integrated flood risk management and climate adaptation strategies. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 375-411. ISSN 1759-5916
Espinoza, D; Rojo, J; Cifuentes, A and Morris, J (2020) DNPV: A valuation methodology for infrastructure and capital investments consistent with prospect theory. Construction Management and Economics, 38(3), pp. 259-274. ISSN 01446193
Esteves, I C A; Medeiros-Junior, R A and Medeiros, M H F (2018) NDT for bridges durability assessment on urban-industrial environment in Brazil. International Journal of Building Pathology and Adaptation, 36(5), pp. 500-515. ISSN 23984708
Everett, J G and Frank Jr, P B (1996) Costs of accidents and injuries to the construction industry. Journal of Construction Engineering and Management, 122(2), pp. 158-164. ISSN 0733-9364
Everett, J G; Halkali, H and Schlaff, T G (1998) Time-lapse video applications for construction project management. Journal of Construction Engineering and Management, 124(3), pp. 204-209. ISSN 0733-9364
Everett, J G and Thompson, W S (1995) Experience modification rating for workers' compensation insurance. Journal of Construction Engineering and Management, 121(1), pp. 66-79. ISSN 0733-9364
Everett, J G and Yang, I T (1997) Workers' comp. Premiums: Disparities in penalties for identical losses. Journal of Construction Engineering and Management, 123(3), pp. 312-317. ISSN 0733-9364
Ey, W; Zuo, J and Han, S (2014) Barriers and challenges of collaborative procurements: An exploratory study. International Journal of Construction Management, 14(3), pp. 148-155. ISSN 1562-3599
Ezulike, E I and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(2), pp. 144-149. ISSN 0969-9988
Fadnavis, Aishwarya Sunil (2026) An integrated coordination framework for construction procurement: Examining early supplier involvement through agent-based modeling. PhD thesis, University of Washington, USA.
Faisol, N; Dainty, A R J and Price, A D F (2005) The concept of 'relational contracting' as a tool for understanding inter- organizational relationships in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Fan, S L (2012) Modified time impact analysis method. Journal of Construction Engineering and Management, 138(2), pp. 227-233. ISSN 0733-9364
Fan, X (2024) Artificial intelligence aided resilient and sustainable water infrastructure systems. PhD thesis, Case Western Reserve University, USA.
Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988
Faraji, A; Homayoon Arya, S; Ghasemi, E; Rashidi, M; Perera, S; Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(1), pp. 384-406. ISSN 1471-4175
Faraziera, M R; Emma, M N and Jamaluddin, Y (2010) Legal issues of partnering in construction industry: Malaysia contract law system. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Fatayer, F A; Issa, A Z; Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(7), pp. 2577-2598. ISSN 0969-9988
Fatemi, M N; Okyere, S A; Diko, S K; Abunyewah, M; Kita, M and Rahman, T (2021) Flooding in mega-cities: Using structural equation modeling to assess flood impact in Dhaka. International Journal of Disaster Resilience in the Built Environment, 12(5), pp. 500-514. ISSN 1759-5916
Fatima, Zahra (2024) Pakistan's international investment policy: Towards a new generation of fair and equitable treatment provisions. PhD thesis, Canterbury Christ Church University, UK.
Fawzy, O N (1991) The development of the architectural working drawing from the descriptive to the prescriptive: A study in architectural communication. PhD thesis, University of Pennsylvania, USA.
Feghaly, J (2020) Innovative delivery of water infrastructure projects. PhD thesis, Arizona State University, USA.
Fehan, H and Aigbogun, O (2021) Influence of internal organizational factors and institutional pressures on construction firms' performance. Construction Economics and Building, 21(2), pp. 81-99. ISSN 2204-9029
Fellows, M F; Phua, F T T and Tutt, D E (2023) Building bridges: The bilingual language work of migrant construction workers. Construction Management and Economics, 41(2), pp. 153-171. ISSN 01446193
Fellows, R and Liu, A (2010) Conflict on multi-national construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 101-109. ISSN 17514312
Fenais, A (2020) Developing an augmented reality solution for mapping underground infrastructure. PhD thesis, Arizona State University, USA.
Feng, Z; Chao, Q; Tan, C and Yang, Y (2023) Using bargaining model with loss aversion and a risk of breakdown to determine compensation for buyback of early terminating BOT highway projects. Journal of Construction Engineering and Management, 149(5): 04023024, ISSN 0733-9364
Fenn, F P (1999) An aetiology of construction disputes. PhD thesis, University of Manchester, UK.
Fenn, P; Lowe, D and Speck, C (1997) Conflict and dispute in construction. Construction Management and Economics, 15(6), pp. 513-518. ISSN 01446193
Fereshtehnejad, S (2018) Multi-hazard lifecycle methods for aging structures and infrastructure systems. PhD thesis, Ohio State University, USA.
Fiener, Y (2011) An intelligent system for vulnerability and remediation assessment of flooded residential buildings. PhD thesis, Loughborough University, UK.
Finke, M R (1998) A better way to estimate and mitigate disruption. Journal of Construction Engineering and Management, 124(6), pp. 490-497. ISSN 0733-9364
Finnie, D; Ali, N A and Park, K (2019) Design development post contract signing in New Zealand: Client's or contractor's cost? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 146-156. ISSN 17514304
Fiorani, Viviane Miranda Araujo (2016) Building sites environmental compensations in urban areas: Focusing the anthropic environment. PhD thesis, Universidade de São Paulo, Brazil.
Firouzi, A; Yang, W and Li, C Q (2016) Prediction of total cost of construction project with dependent cost items. Journal of Construction Engineering and Management, 142(12): 04016072, ISSN 0733-9364
Fischer, J (2010) Translating zero carbon into building design regulation, theories and practices. PhD thesis, University of Manchester, UK.
Fisher, R B (2004) Partnering public sector construction contracts: A conflict avoidance process. PhD thesis, Virginia Commonwealth University, USA.
Fisher, W H (2017) The use of arbitration in the construction industry in England and Wales: an evaluation of its continuing role following the Arbitration Act 1996. PhD thesis, University of Wolverhampton, UK.
Florencio, Lutemberg de Araújo (2018) Structuring of a rating system for the classification of risk of linking commercial real estate properties as guarantee for long-term credit operations. PhD thesis, Universidade de São Paulo, Brazil.
Fobiri, G; Musonda, I and Muleya, F (2025) Using reality capture technology for efficient cost valuation and work verification of construction projects. Construction Innovation, 25(7), pp. 50-75. ISSN 1471-4175
Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.
Fondahl, J W (1991) The development of the construction engineer: Past progress and future problems. Journal of Construction Engineering and Management, 117(3), pp. 380-392. ISSN 0733-9364
Forman, M and Haugbølle, K (2009) Arbitration and expert appraisals of defects in construction: What do companies learn? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Fox, J V S (2014) Incentives and limits in letters of intent: Are they worth the paper they're written on? International Journal of Law in the Built Environment, 6(3), pp. 214-232. ISSN 1756-1450
Fox, S J (2010) Information and communication design for multi-disciplinary multi-national education and research. International Journal of Construction Education and Research, 6(1), pp. 30-45. ISSN 1557-8771
Francart, N (2021) Decision support for the implementation of low-carbon measures in the building sector. PhD thesis, KTH Royal Institute of Technology, Sweden.
France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects. PhD thesis, University of Texas at Austin, USA.
Frances, Z and Stevenson, F (2018) Domestic photovoltaic systems: The governance of occupant use. Building Research & Information, 46(1), pp. 23-41. ISSN 0961-3218
Franz, B W and Leicht, R M (2016) An alternative classification of project delivery methods used in the United States building construction industry. Construction Management and Economics, 34(3), pp. 160-173. ISSN 01446193
Fu, J; Tian, H; Song, L; Li, M; Bai, S and Ren, Q (2021) Productivity estimation of cutter suction dredger operation through data mining and learning from real-time big data. Engineering, Construction and Architectural Management, 28(7), pp. 2023-2041. ISSN 0969-9988
Fu, Y and Zhang, S (2015) The interaction of trust and contractual governance on dispute negotiation strategy in contractor-subcontractor relationships. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Fujino, T (1994) The development of a method for investigating construction site accidents using fuzzy fault tree analysis. PhD thesis, Ohio State University, USA.
Fung, I W H and Tam, V W Y (2013) Occupational health and safety of older construction workers (aged 55 or above): Their difficulties, needs, behaviour and suitability. International Journal of Construction Management, 13(3), pp. 15-34. ISSN 1562-3599
Gaafar, H K (1997) Risk allocations in standard forms of engineering and construction contract. PhD thesis, University of Birmingham, UK.
Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts. PhD thesis, Iowa State University, USA.
Gaddala, K and Raju, P S (2020) Optimal location of UPQC for power quality improvement: Novel hybrid approach. Journal of Engineering, Design and Technology, 18(6), pp. 1519-1541. ISSN 1726-0531
Gajjar, D; Lucas, J and Davis, D (2023) Understanding employee perception to promote management level workforce development for roofing contractors. International Journal of Construction Education and Research, 19(2), pp. 221-238. ISSN 1557-8771
Galardo, L and Trottier, M (2022) How supervisor, co-worker, and spousal social support influences the experience of workload and work-family conflict: Results from a survey of construction workers in Québec. Construction Management and Economics, 40(4), pp. 331-342. ISSN 01446193
Galotti, V (2025) An exploration of design-build risk and project profitability in the architecture, engineering and construction sector. PhD thesis, University of Colorado at Boulder, USA.
Gambo, N; Said, I and Ismail, R (2016) Influences of cost factors affecting technical performance of local government projects in Nigeria: A partial least square-structural equation modeling approach. Journal of Construction in Developing Countries, 21(1), pp. 85-111. ISSN 1823-6499
Gambo, N; Said, I and Ismail, R (2017) Mediation model for improving cost factors that affect performance of small-scale building construction contract business in Nigeria: A PLS-SEM approach. International Journal of Construction Education and Research, 13(1), pp. 24-46. ISSN 1557-8771
Gamil, Y and Abdul Rahman, I (2023) Impact of poor communication on dispute occurrence in the construction industry: A preliminary exploratory study of Yemen construction industry. International Journal of Construction Management, 23(16), pp. 2729-2735. ISSN 1562-3599
Gangrade, R (2021) Quantifying spatial geotechnical uncertainty to advance the practice of risk assessment and decision-making for tunnel projects. PhD thesis, Colorado School of Mines, USA.
Gao, L; Luo, X; Yang, W; Zhang, N and Deng, X (2023) Relationship between social support and repatriation intention of expatriates in international construction projects. Engineering, Construction and Architectural Management, 30(8), pp. 3292-3309. ISSN 0969-9988
Garakani, S A; Lak, A and Niyasati, M (2020) Toward sustainable development in post-flood relocation of rural settlements in Iran. International Journal of Disaster Resilience in the Built Environment, 11(3), pp. 359-377. ISSN 1759-5916
Garvin, M J and Cheah, C Y J (2004) Valuation techniques for infrastructive investment decisions. Construction Management and Economics, 22(4), pp. 373-383. ISSN 01446193
Gatley, D (2004) A critical examination of building contracts in New Zealand: an investigation into the types of building contracts employed ; their formation and administration ; and into the incidence, nature and resolution of disputes resulting from their usage ; in the commercial and residential sectors of the construction industry in New Zealand. PhD thesis, RMIT University, Australia.
Gebken, Richard John (2006) Quantification of transactional dispute resolution costs for the U.S. Construction industry. PhD thesis, University of Texas at Austin, USA.
Gebken II, R J (2006) Quantification of transactional dispute resolution costs for the United States construction industry. PhD thesis, University of Texas at Austin, USA.
Geminiani, F L; Smallwood, J J and van Wyk, J J (2008) The effectiveness of the occupational health and safety (OH&S) inspectorate in South African construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Georg, S and Tryggestad, K (2009) On the emergence of roles in construction: The qualculative role of project management. Construction Management and Economics, 27(10), pp. 969-981. ISSN 1466433X
Gerber, J K and Yacoubian G.S, Jr (2001) Evaluation of drug testing in the workplace: Study of the construction industry. Journal of Construction Engineering and Management, 127(6), pp. 438-444. ISSN 0733-9364
Ghaeli, M R (1998) Pavement and bridge cost allocation analysis of the Intario intercity highway network. PhD thesis, University of Waterloo, USA.
Ghaffari, A (2013) Developing a mathematical model for profit sharing amongst partners in consulting engineering companies of construction projects. PhD thesis, Savitribai Phule Pune University, India, India.
Ghaffari, M (2017) The impact of multitasking on critical chain portfolios. PhD thesis, University of Manchester, UK.
Ghafoori, M and Abdallah, M (2025) Multi-criteria decision support model for material and supplier selection in the construction industry. International Journal of Construction Management, 25(4), pp. 409-418. ISSN 1562-3599
Ghansah, F A and Lu, W (2025) Cyber-physical systems and digital twins for "cognitive building" in the construction industry. Construction Innovation, 25(3), pp. 787-818. ISSN 1471-4175
Ghorbany, S; Yousefi, S and Noorzai, E (2024) Evaluating and optimizing performance of public-private partnership projects using copula Bayesian network. Engineering, Construction and Architectural Management, 31(1), pp. 290-323. ISSN 0969-9988
Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalised construction safety document management system for advanced constructions using building information modeling. International Journal of Construction Management, 26(8), pp. 1490-1507. ISSN 1562-3599
Ghosh, B and Karmakar, S (2025) Development and application of a digitalized construction quality document management system for advanced construction using building information modeling. Journal of Construction Engineering and Management, 151(6): 04025053, ISSN 0733-9364
Gibbs, D. J.; Lord, W.; Emmitt, S. B. A. and Ruikar, K. (2015) BIM and construction contracts: Cpc 2013's approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 285-293. ISSN 1751-4304
Gibbs, D J; Lord, W; Emmitt, S B A and Ruikar, K (2015) BIM and construction contracts: CPC 2013’s approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 285-293. ISSN 17514304
Gibbs, D-J (2017) Development of building information models (BIM) to support innovative time management and delay analysis. EngD thesis, Loughborough University, UK.
Gill, A; Gray, J; Skitmore, M and Callaghan, S (2015) Comparison of the effects of litigation and adr in South-East Queensland. International Journal of Construction Management, 15(3), pp. 254-263. ISSN 1562-3599
Gill, G N (2014) Environmental protection and developmental interests: A case study of the River Yamuna and the Commonwealth Games, Delhi, 2010. International Journal of Law in the Built Environment, 6(1-2), pp. 69-90. ISSN 1756-1450
Gilmour, T; Wiesel, I; Pinnegar, S and Loosemore, M (2010) Social infrastructure partnerships: A firm rock in a storm? Journal of Financial Management of Property and Construction, 15(3), pp. 247-259. ISSN 1366-4387
Giri, O P; Sainju, P R and Htet, A (2025) Evaluating occupational health and safety practices in an airport construction project in Nepal. Built Environment Project and Asset Management, 15(1), pp. 149-164. ISSN 2044-124X
Glagola, C R and Sheedy, W M (2002) Partnering on defense contracts. Journal of Construction Engineering and Management, 128(2), pp. 127-138. ISSN 0733-9364
Glew, D; Johnston, D; Miles-Shenton, D and Thomas, F (2020) Retrofitting suspended timber ground-floors; comparing aggregated and disaggregated evaluation methods. Building Research & Information, 48(5), pp. 572-586. ISSN 0961-3218
Gluch, P and Räisänen, C (2009) Interactional perspective on environmental communication in construction projects. Building Research & Information, 37(2), pp. 164-175. ISSN 0961-3218
Godfrey, R J (2007) Analysis of construction worker injury information from a workers' compensation database. PhD thesis, University of Florida, USA.
Goh, Y L (2004) The effect of higher workers' compensation premium rates on construction worker wages and the reporting of injuries. PhD thesis, University of Utah, USA.
Goldenberg, M and Shapira, A (2007) Systematic evaluation of construction equipment alternatives: Case study. Journal of Construction Engineering and Management, 133(1), pp. 72-85. ISSN 0733-9364
Goncalves, V L; Costanzo, V; Fabbri, K and Rakha, T (2022) Overheating assessment in Passivhaus dwellings: The influence of prediction tools. Buildings & Cities, 3(1), pp. 153-167. ISSN 2632-6655
Gongming, M (2018) The influence of trust on risk allocation in Chinese PPP projects. PhD thesis, ISCTE - Instituto Universitario de Lisboa, Portugal.
Goodarzi, M (2021) A post-construction evaluation of long-term success in LEED-certified residential communities. PhD thesis, Michigan State University, USA.
Gorse, C A (2004) Monitoring, planning and tracking: Delay, disruption and legal risk management. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Gorse, C A; Ellis, R and Hudson-Tyreman, A (2005) Prospective delay analysis and adjudication. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Goswami, M; Singh, J and Kumar, V (2016) An enterprise based decision support system for engineering aggregate selection: A case study. Journal of Engineering, Design and Technology, 14(4), pp. 851-873.
Gould, N (1998) Alternative dispute resolution in the UK construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Gould, N and King, C (2010) The mediation of construction disputes: Recent research. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(1), pp. 29-39. ISSN 17514312
Govender, N; Laryea, S and Watermeyer, R (2025) Blueprint to success: Project managers' perspectives on key factors influencing construction document quality in South Africa. Journal of Construction Engineering and Management, 151(11): 05025015, ISSN 0733-9364
Goyal, S; Routroy, S and Singhal, A (2019) Analyzing environment sustainability enablers using fuzzy DEMATEL for an Indian steel manufacturing company. Journal of Engineering, Design and Technology, 17(2), pp. 300-329. ISSN 1726-0531
Greeff, T N (2018) Justification for the recognition of a new nominate contract based on project defect management. LLD thesis, University of Pretoria, South Africa.
Greenwood, D; Hogg, K and Kan, S (2005) Subcontractors' liability for project delay. Journal of Financial Management of Property and Construction, 10(2), pp. 107-114. ISSN 1366-4387
Greenwood, D J (2001) Power and proximity: A study of subcontract formation in the UK building industry. PhD thesis, University of Reading, UK.
Greenwood, D J and Yates, D J (2006) The determinants of successful partnering: A transaction cost perspective. Journal of Construction Procurement, 12(1),
Greer, Fiona Muriel (2021) Life-cycle environmental and economic management of airport infrastructure and operations. PhD thesis, University of California, USA.
Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.
Gregory-Stevens, J; Frame, I and Henjewele, C (2016) Mediation in construction disputes in England. International Journal of Law in the Built Environment, 8(2), pp. 123-136. ISSN 1756-1450
Griffey, T (2011) Black power's labor politics: The united construction workers association and Title VII law in the 1970s. PhD thesis, University of Washington, USA.
Grosse, H (2023) Thrown into a construction dispute: The personal toll of aggressive claims management. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193
Gu, T; Hao, E; Dirks, K; Kieu, M and Zhang, R (2026) Enhancing residents' satisfaction in old community renewal: Application and validation of an extended expectation-disconfirmation theory model. Journal of Construction Engineering and Management, 152(4): 04026023, ISSN 0733-9364
Guan, L (2023) An extended TOE model for digital procurement adoption of Chinese construction industry: A case study of H group. PhD thesis, ISCTE - Instituto Universitario de Lisboa, Portugal.
Gunarathna, C; Yang, R J and Fernando, N (2018) Conflicts and management styles in the Sri Lankan commercial building sector. Engineering, Construction and Architectural Management, 25(2), pp. 178-201. ISSN 0969-9988
Gunduz, M and Elsherbeny, H A (2020) Critical assessment of construction contract administration using fuzzy structural equation modeling. Engineering, Construction and Architectural Management, 27(6), pp. 1233-1255. ISSN 0969-9988
Gunduz, M and Elsherbeny, H A (2021) Critical assessment of contract administration using multidimensional fuzzy logic approach. Journal of Construction Engineering and Management, 147(2): 04020162, ISSN 0733-9364
Gunhan, S and Arditi, D (2005) International expansion decision for construction companies. Journal of Construction Engineering and Management, 131(8), pp. 928-937. ISSN 0733-9364
Gunhan, S M (2003) Foreign market entry decision model for construction companies. PhD thesis, Illinois Institute of Technology, USA.
Gunning, J G and Hanna, J I C (2001) The application of risk management principles to crisis management in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Gupta, P and Jha, K N (2024) Integration of blockchain in contract management for prevention of construction disputes: A systematic literature review and conceptual framework. International Journal of Construction Management, 24(10), pp. 1054-1065. ISSN 1562-3599
Gupta, R; Shah, M N and Mandal, S N (2023) Emerging paradigm for land records in India. Smart and Sustainable Built Environment, 12(5), pp. 963-974. ISSN 2046-6099
Gurgun, A P and Koc, K (2020) Contractor prequalification for green buildings: Evidence from Turkey. Engineering, Construction and Architectural Management, 27(6), pp. 1377-1400. ISSN 0969-9988
Gurgun, A P and Koc, K (2022) Administrative risks challenging the adoption of smart contracts in construction projects. Engineering, Construction and Architectural Management, 29(2), pp. 989-1015. ISSN 0969-9988
Gurgun, A P and Koc, K (2023) The role of contract incompleteness factors in project disputes: A hybrid fuzzy multi-criteria decision approach. Engineering, Construction and Architectural Management, 30(9), pp. 3895-3926. ISSN 0969-9988
Gwimile, T A (2026) Holistic maintenance management for higher learning institution buildings in Tanzania. International Journal of Building Pathology and Adaptation, 44(1), pp. 223-240. ISSN 2398-4708
Hadikusumo, B H W and Tobgay, S (2015) Construction claim types and causes for a large-scale hydropower project in Bhutan. Journal of Construction in Developing Countries, 20(1), pp. 49-63. ISSN 1823-6499
Hadipriono, F C; Lim, C L and Wong, K H (1986) Event tree analysis to prevent failures in temporary structures. Journal of Construction Engineering and Management, 112(4), pp. 500-513. ISSN 0733-9364
Hagberg, J and Styhre, A (2013) The production of social space: Shopping malls as relational and transductive spaces. Journal of Engineering, Design and Technology, 11(3), pp. 354-374. ISSN 1726-0531
Haghighi, Z (2022) Architectural photovoltaic application. PhD thesis, Delft University of Technology, Netherlands.
Haji Abdullah, M A b (2015) An investigation of the development of mediation in the UK construction industry. PhD thesis, University of Manchester, UK.
Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.
Halder, A. (2026) Modeling critical driving factors of stakeholder integration and their influences on construction megaproject performance: A regression-based analysis. Journal of Engineering, Design and Technology, 24(1), pp. 213-241. ISSN 1726-0531
Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.
Hamid, W and Tutt, D (2019) "Thrown away like a banana leaf": Precarity of labour and precarity of place for tamil migrant construction workers in Singapore. Construction Management and Economics, 37(9), pp. 513-536. ISSN 01446193
Hamideh, Z (2013) The under-reporting of injuries for Hispanic workers in construction. PhD thesis, University of Utah, USA.
Hammad, M M (2001) CPDICenter: Web-based virtual construction project document information center in support of claims preparation. PhD thesis, Concordia University, Canada.
Han, S H and Diekmann, J (2004) Judgment-based cross-impact method for predicting cost variance for highly uncertain projects. Journal of Construction Research, 5(2), pp. 171-192. ISSN 1609-9451
Han, Y; Li, J; Cao, X and Jin, R (2020) Structural equation modeling approach to studying the relationships among safety investment, construction employees' safety cognition, and behavioral performance. Journal of Construction Engineering and Management, 146(7): 04020065, ISSN 0733-9364
Hancher, D E; De La Garza, J M and Eckert, G K (1997) Improving workers' compensation management in construction. Journal of Construction Engineering and Management, 123(3), pp. 285-291. ISSN 0733-9364
Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364
Hanna, A S; Russell, J S; Gotzion, T W and Nordheim, E V (1999) Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3), pp. 176-184. ISSN 0733-9364
Hanna, A S; Russell, J S; Nordheim, E V and Bruggink, M J (1999) Impact of change orders on labor efficiency for electrical construction. Journal of Construction Engineering and Management, 125(4), pp. 224-232. ISSN 0733-9364
Hanna, A S; Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(6), pp. 721-730. ISSN 01446193
Haraguchi, M and Kim, S (2016) Critical infrastructure interdependence in New York city during hurricane sandy. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 133-143. ISSN 1759-5916
Harmon, K M J (2003) Dispute review boards and construction conflicts: Attitudes and opinions of construction industry members. PhD thesis, Nova Southeastern University, USA.
Harmon, K M J (2003) Effectiveness of dispute review boards. Journal of Construction Engineering and Management, 129(6), pp. 674-679. ISSN 0733-9364
Harper, C M (2014) Measuring project integration using relational contract theory. PhD thesis, University of Colorado at Boulder, USA.
Hartman, F and Snelgrove, P (1996) Risk allocation in lump-sum contracts: concept of latent dispute. Journal of Construction Engineering and Management, 122(3), pp. 291-296. ISSN 0733-9364
Hartman, F T (1993) Construction dispute reduction through an improved contracting process in the Canadian context. PhD thesis, Loughborough University, UK.
Harty, C (2008) Implementing innovation in construction: Contexts, relative boundedness and actor-network theory. Construction Management and Economics, 26(10), pp. 1029-1041. ISSN 1466433X
Harvey, E (2019) Rethinking construction safety. PhD thesis, Loughborough University, UK.
Hasan, A and Kamardeen, I (2022) Occupational health and safety barriers for gender diversity in the Australian construction industry. Journal of Construction Engineering and Management, 148(9): 04022100, ISSN 0733-9364
Hasanzadeh, S and De La Garza, J M (2020) Productivity-safety model: Debunking the myth of the productivity-safety divide through a mixed-reality residential roofing task. Journal of Construction Engineering and Management, 146(11): 04020124, ISSN 0733-9364
Hasanzadeh, S; De La Garza, J M and Geller, E S (2020) Latent effect of safety interventions. Journal of Construction Engineering and Management, 146(5): 04020033, ISSN 0733-9364
Hashemi, H; Mousavi, S M and Mojtahedi, S M H (2011) Bootstrap technique for risk analysis with interval numbers in bridge construction projects. Journal of Construction Engineering and Management, 137(8), pp. 600-608. ISSN 0733-9364
Hashim, H M; Ng, Y G; Talib, O and Md Tamrin, S B (2019) Content validation of flood disaster preparedness action (FDPA) items among small and medium enterprises (SME) business. International Journal of Disaster Resilience in the Built Environment, 10(1), pp. 2-13. ISSN 1759-5916
Hassan, F U; Le, T and Lv, X (2021) Addressing legal and contractual matters in construction using natural language processing: A critical review. Journal of Construction Engineering and Management, 147(9): 03121004, ISSN 0733-9364
Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.
Hassan, O A B (2016) Effect of foundation designs of passive house on the thermal bridges at the ground. Journal of Engineering, Design and Technology, 14(3), pp. 602-613.
Haupt, T C and Pillay, K (2016) Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14(2), pp. 373-419.
He, S; Li, J; Li, M and Antwi-Afari, M F (2026) Modeling and analyzing workers' hazard perception in construction equipment operations: A hierarchical Bayesian cognitive modeling approach integrating multisource data. Journal of Construction Engineering and Management, 152(5): 04026054, ISSN 0733-9364
He, C; Liu, M; Hsiang, S M; Pierce, N; Megahed, S and Godfrey, A (2025) An ontological knowledge-driven smart contract framework for implicit bridge preservation decision making. Journal of Construction Engineering and Management, 151(4): 04025008, ISSN 0733-9364
He, X; Liu, R and Anumba, C J (2021) Data-driven insights on the knowledge gaps of conceptual cost estimation modeling. Journal of Construction Engineering and Management, 147(2): 04020165, ISSN 0733-9364
Heaphy, I (2013) NEC versus fidic. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 21-30. ISSN 17514304
Hedgren, E and Stehn, L (2014) The impact of clients' decision-making on their adoption of industrialized building. Construction Management and Economics, 32(1-2), pp. 126-145. ISSN 01446193
Hegazy, T; Abdel-Monem, M and Saad, D A (2014) Framework for enhanced progress tracking and control of linear projects. Engineering, Construction and Architectural Management, 21(1), pp. 94-110. ISSN 0969-9988
Hegazy, T and Zhang, K (2005) Daily windows delay analysis. Journal of Construction Engineering and Management, 131(5), pp. 505-512. ISSN 0733-9364
Hendrickson, C; Martinelli, D and Rehak, D (1987) Hierarchical rule-based activity duration estimation. Journal of Construction Engineering and Management, 113(2), pp. 288-301. ISSN 0733-9364
Heravi Torbati, Amir Hossein (2014) Improving construction management: An investigation into the influences of effective stakeholder involvement on project quality outcomes. PhD thesis, Queensland University of Technology, Australia.
Herrera-Pérez, V.; Rubio-Romero, J. C.; Fuertes, A.; Salguero-Caparrós, F. and del Carmen Pardo-Ferreira, M. (2026) Investigating the impact of medication consumption on crane-related occupational health and safety risks in construction projects. Journal of Construction Engineering and Management, 152(8): 04026116, ISSN 0733-9364
Herrmann, M R; Brumby, D P; Oreszczyn, T and Gilbert, X M P (2018) Does data visualization affect users' understanding of electricity consumption? Building Research & Information, 46(3), pp. 238-250. ISSN 0961-3218
Hester, W T; Kuprenas, J A and Thomas, H R (1987) Arbitration: A look at its form and performance. Journal of Construction Engineering and Management, 113(3), pp. 353-367. ISSN 0733-9364
Hetherton, T and Charlson, J (2015) When statutes collide: Potential recovery of own party adjudication costs. International Journal of Law in the Built Environment, 7(3), pp. 214-230. ISSN 1756-1450
Hillig, J B; Dan-Asabe, D; Donyavi, S; Dursun, O and Thampuratty, A (2010) Fidic's red book 1999 edition: A study review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 129-133. ISSN 17514312
Hindmarch, H; Gale, A W and Harrison, R E (2010) A proposed construction design change management tool to aid in making informed design decisions. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Hinze, J (2005) Use of trench boxes for worker protection. Journal of Construction Engineering and Management, 131(4), pp. 494-500. ISSN 0733-9364
Hinze, J and Appelgate, L L (1991) Costs of construction injuries. Journal of Construction Engineering and Management, 117(3), pp. 537-550. ISSN 0733-9364
Hinze, J; Bren, D C and Piepho, N (1995) Experience modification rating as measure of safety performance. Journal of Construction Engineering and Management, 121(4), pp. 455-458. ISSN 0733-9364
Hinze, J and Olbina, S (2009) Empirical analysis of the learning curve principle in prestressed concrete piles. Journal of Construction Engineering and Management, 135(5), pp. 425-431. ISSN 0733-9364
Hinze, J and Roxo, J (1984) Is injury occurrence related to lunar cycles? Journal of Construction Engineering and Management, 110(4), pp. 409-419. ISSN 0733-9364
Hinze, J and Wiegand, F (1992) Role of designers in construction worker safety. Journal of Construction Engineering and Management, 118(4), pp. 677-684. ISSN 0733-9364
Hiyassat, M A; Alkasagi, F; El-Mashaleh, M and Sweis, G J (2022) Risk allocation in public construction projects: The case of Jordan. International Journal of Construction Management, 22(8), pp. 1478-1488. ISSN 1562-3599
Hjerpe, M; Glaas, E and Storbjörk, S (2025) Introducing a severe impacts approach to guide adaptation to pluvial floods in residential and public buildings. Building Research & Information, 53(7), pp. 817-832. ISSN 0961-3218
Ho, S P (2005) Bid compensation decision model for projects with costly bid preparation. Journal of Construction Engineering and Management, 131(2), pp. 151-159. ISSN 0733-9364
Ho, S P and Liu, L Y (2004) Analytical model for analyzing construction claims and opportunistic bidding. Journal of Construction Engineering and Management, 130(1), pp. 94-104. ISSN 0733-9364
Holt, G D (1995) A methodology for predicting the performance of construction contractors. PhD thesis, University of Wolverhampton, UK.
Home, R (2012) Forced eviction and planning enforcement: The Dale Farm gypsies. International Journal of Law in the Built Environment, 4(3), pp. 178-188. ISSN 1756-1450
Home, R (2017) Deregulating planning control over britain's housing stock. International Journal of Law in the Built Environment, 9(3), pp. 193-206. ISSN 1756-1450
Honda, Wilson Saburo (2016) Sustainability certificate of corporate offices buildings in Brazil. PhD thesis, Universidade de São Paulo, Brazil.
Hoque, M I; Safayet, M A; Rana, M J; Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(2), pp. 401-421. ISSN 23984708
Horgan, I (2014) The influence of an online collaboration tool on relationships in inter-organisational networks. PhD thesis, Victoria University, Australia.
Hosny, O; Nassar, K and Esmail, Y (2013) Prequalification of Egyptian construction contractors using fuzzy-AHP models. Engineering, Construction and Architectural Management, 20(4), pp. 381-405. ISSN 0969-9988
Hossain, M M; Ahmed, S; Anam, S M A; Baxramovna, I A; Meem, T I; Sobuz, M H R and Haq, I (2025) BIM-based smart safety monitoring system using a mobile app: A case study in an ongoing construction site. Construction Innovation, 25(2), pp. 552-576. ISSN 1471-4175
Hosseini, K A; Hosseini, M; Hosseinioon, S; Izadkhah, Y O; Shaw, T and Takahashi, R (2014) A survey on evacuation planning and its challenges for potential earthquake in Tehran. International Journal of Disaster Resilience in the Built Environment, 5(1), pp. 38-52. ISSN 1759-5916
Hosseini, M H; Aibinu, A; Chileshe, N and Arashpour, M (2017) Eleven years of arcom: Bibliometric mapping of studies published between 2005 and 2016. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Hosseini, M R; Martek, I; Chileshe, N; Zavadskas, E K and Arashpour, M (2018) Assessing the influence of virtuality on the effectiveness of engineering project networks: "Big five theory" perspective. Journal of Construction Engineering and Management, 144(7): 04018059, ISSN 0733-9364
Hosseinian, S M (2016) An optimal time incentive/disincentive -based compensation in contracts with multiple agents. Construction Economics and Building, 16(4), pp. 35-53. ISSN 2204-9029
Hosseinian, S M; Andalib, M and Carmichael, D G (2022) Appropriate types of payments in construction contracts based on agency theory parameters. Journal of Construction Engineering and Management, 148(1): 04021187, ISSN 0733-9364
Houlihan, T J (1994) The New York City building trades, 1890-1910. PhD thesis, State University of New York at Binghamton, USA.
Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors. PhD thesis, Clemson University, USA.
Hsu, C L; Wang, J T and Hou, H Y (2023) A blockchain-based parametric model library for knowledge sharing in building information modeling collaboration. Journal of Construction Engineering and Management, 149(11): 04023107, ISSN 0733-9364
Hu, Z.; Li, S.; He, C.; Shen, Y. and Xu, Z. (2026) Effect of management commitment on construction project safety resilience: Safety competence and working conditions as the mediators. Journal of Construction Engineering and Management, 152(8): 04026123, ISSN 0733-9364
Hua, X; Zhang, S; Shi, X and Zhang, Y (2025) Differences in risk analysis between workers and managers: Study from the perspective of neuroscience. Journal of Construction Engineering and Management, 151(7): 04025079, ISSN 0733-9364
Huang, C F and Lien, H C (2012) An empirical analysis of the influences of corporate social responsibility on organizational performance of Taiwan's construction industry: Using corporate image as a mediator. Construction Management and Economics, 30(4), pp. 263-275. ISSN 1466433X
Huang, J (2020) Infrastructure, the economy and policy. PhD thesis, University of Oxford, UK.
Huang, K-S (2003) Development-related BOT: A lesson of under-utilized and over-utilized development synergy in Taiwan. DDes thesis, Harvard University, USA.
Huang, W; Zhong, D and Chen, Y (2024) The relationship between construction workers' emotional intelligence and safety performance. Engineering, Construction and Architectural Management, 31(5), pp. 2176-2201. ISSN 0969-9988
Huang, X; Bernd, D and Bernold, L E (1996) Innovative technology development for safe excavation. Journal of Construction Engineering and Management, 122(1), pp. 91-96. ISSN 0733-9364
Huang, X; Zhang, J; Meng, X; Wang, R; Li, J; Tao, X; Yang, Z and Li, L (2025) Verifiable safety path planning: Utilizing planar analysis for improved lifting operations. Journal of Construction Engineering and Management, 151(9): 04025123, ISSN 0733-9364
Huang, Y L (2008) The pricing of conditional performance guarantees with risky collateral. Construction Management and Economics, 26(9), pp. 967-978. ISSN 1466433X
Huang, Y L (2009) Prediction of contractor default probability using structural models of credit risk: An empirical investigation. Construction Management and Economics, 27(6), pp. 581-596. ISSN 1466433X
Huang, Y L and Lin, W (2010) Does debt structure matter? Estimating contractor default barrier by the down-and-out call option approach. Construction Management and Economics, 28(9), pp. 947-958. ISSN 1466433X
Hubbard, P (2015) Law, sex and the city: Regulating sexual entertainment venues in England and Wales. International Journal of Law in the Built Environment, 7(1), pp. 5-20. ISSN 1756-1450
Hughes, J (2020) Global claims in engineering and construction contracts. PhD thesis, University of Strathclyde, UK.
Hughes, W P and Shinoda, H (1999) Achieving satisfactory contractual terms for the engineer's role. In: Hughes, W P (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Hui, K J (2008) Court decisions on building contract disputes: a Coasian empirical analysis. PhD thesis, University of Hong Kong, Hong Kong.
Hulio, Z H and Jiang, W (2020) An assessment of effects of non-stationary operational conditions on wind turbine under different wind scenario. Journal of Engineering, Design and Technology, 18(1), pp. 102-121. ISSN 1726-0531
Huong, H T L and Dzung, L H (2020) Criteria for flood warning levels in Vietnam. International Journal of Disaster Resilience in the Built Environment, 11(5), pp. 645-658. ISSN 1759-5916
Husam, S; Laishram, B and Johari, S (2024) Determining the extent of attributes contributing to gender inclusion of workers in the construction industry. Journal of Construction Engineering and Management, 150(10): 04024145, ISSN 0733-9364
Hyari, K H; Shatarat, N and Khalafallah, A (2017) Handling risks of quantity variations in unit-price contracts. Journal of Construction Engineering and Management, 143(10): 04017079, ISSN 0733-9364
Hymes, S J (2010) Front end specifications and the propagation of construction claims. DSc thesis, Washington University in St. Louis, USA.
Hymes, S J (2011) Front-end specifications and construction claims. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 139-146. ISSN 17514312
Ibbs, C W (1985) Product specification practices and problems. Journal of Construction Engineering and Management, 111(2), pp. 157-172. ISSN 0733-9364
Ibbs, C W (1986) Brand name or equalproduct specifications. Journal of Construction Engineering and Management, 112(1), pp. 1-13. ISSN 0733-9364
Ibbs, C W; Bates, L C and Echeverry, D (1987) Owner-furnished equipment (OFE) contract practices. Journal of Construction Engineering and Management, 113(2), pp. 249-263. ISSN 0733-9364
Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364
Ibbs, W and Nguyen, L D (2007) Alternative for quantifying field-overhead damages. Journal of Construction Engineering and Management, 133(10), pp. 736-742. ISSN 0733-9364
Ibbs, W; Nguyen, L D and Simonian, L (2011) Concurrent delays and apportionment of damages. Journal of Construction Engineering and Management, 137(2), pp. 119-126. ISSN 0733-9364
Ibironke, O T; Oladinrin, T O; Adeniyi, O and Eboreime, I V (2013) Analysis of non-excusable delay factors influencing contractors' performance in Lagos State, Nigeria. Journal of Construction in Developing Countries, 18(1), pp. 53-72. ISSN 1823-6499
Ibrahim, A.; Badawy, M. and Hamdy, K. (2026) Modeling interdependent constraints on modular construction: A constraint theory and fuzzy-PLS-SEM approach for developing countries. Journal of Engineering, Design and Technology, 24(3), pp. 734-754. ISSN 1726-0531
Ibrahim, K I; Costello, S B; Wilkinson, S and Walker, D (2016) Project alliancing: The case of road infrastructure projects in New Zealand. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Ibrahim, W A B (2016) Regulatory framework for adjudicators in the Malaysian construction industry. PhD thesis, University of Strathclyde, UK.
Ibrahim, Y M; Kaka, A P; Aouad, G and Kagioglou, M (2008) As-built documentation of construction sequence by integrating virtual reality with time-lapse movies. Architectural Engineering and Design Management, 4(2), pp. 73-84. ISSN 1745-2007
Iftikhar, Rehab (2017) Crisis management in project based organizations and mega projects: An integrated approach. PhD thesis, Luiss Guido Carli, Italy.
Illankoon, I M C S; Tam, V W Y; Le, K N and Ranadewa, K A T O (2022) Causes of disputes, factors affecting dispute resolution and effective alternative dispute resolution for Sri Lankan construction industry. International Journal of Construction Management, 22(2), pp. 218-228. ISSN 1562-3599
Ilter, D (2012) Identification of the relations between dispute factors and dispute categories in construction projects. International Journal of Law in the Built Environment, 4(1), pp. 45-59. ISSN 1756-1450
Ilter, D; Cakmak, P I; Ustuner, Y A and Tas, E (2016) Toward a research roadmap for construction mediation. International Journal of Law in the Built Environment, 8(2), pp. 176-190. ISSN 1756-1450
Ilter, D and Dikbas, A (2009) An analysis of the key challenges to the widespread use of mediation in the Turkish construction industry. International Journal of Law in the Built Environment, 1(2), pp. 143-155. ISSN 1756-1450
Imriyas, K; Low, S P; Teo, A L and Chan, S L (2008) Premium-rating model for workers' compensation insurance in construction. Journal of Construction Engineering and Management, 134(8), pp. 601-617. ISSN 0733-9364
Imriyas, K; Pheng, L S and Teo, E A L (2007) A framework for computing workers' compensation insurance premiums in construction. Construction Management and Economics, 25(6), pp. 563-584. ISSN 1466433X
Imriyas, K; Pheng, L S and Teo, E A L (2007) A fuzzy knowledge-based system for premium rating of workers' compensation insurance for building projects. Construction Management and Economics, 25(11), pp. 1177-1195. ISSN 01446193
Innella, Filomena (2020) Performance of building modules production and transportation. PhD thesis, Monash University, Australia.
Inti, S (2016) A decision making approach for selection of sustainable pavements in Texas by integrating life cycle cost analysis (LCCA), life cycle assessment (LCA) of environmental and social impacts. PhD thesis, University of Texas at El Paso, USA.
Ioannou, P G and Awwad, R E (2010) Below-average bidding method. Journal of Construction Engineering and Management, 136(9), pp. 936-946. ISSN 0733-9364
Ioannou, P G and Leu, S S (1993) Average-bid method: competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147. ISSN 0733-9364
Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(1), pp. 59-87. ISSN 01446193
Irfan, M; Khalid, R A; Kaka Khel, S S U H; Maqsoom, A and Sherani, I K (2023) Impact of work–life balance with the role of organizational support and job burnout on project performance. Engineering, Construction and Architectural Management, 30(1), pp. 154-171. ISSN 0969-9988
Iseley, D T (1991) Trenchless excavation construction methods: Classification and evaluation. Journal of Construction Engineering and Management, 117(3), pp. 521-536. ISSN 0733-9364
Isiofia, L A; Nna, E; Uzuegbunam, F O and Ibem, E O (2024) The association of physical development density, prevalence and types of microbes in colonized façade finishes in enugu metropolis, Nigeria. International Journal of Building Pathology and Adaptation, 42(6), pp. 1147-1168. ISSN 2398-4708
Islam, M S; Nepal, M P and Skitmore, M (2019) Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects. Journal of Construction Engineering and Management, 145(2): 04018126, ISSN 0733-9364
Ismail, S (2013) Analyzing coordination function within a governance structure: Evidence from case studies of selected housing projects in Malaysia. PhD thesis, University of Malaya, Malaysia.
Israel, B (2023) The impact of clients' procurement challenges on the substance goals of roads construction projects in songwe, Tanzania. International Journal of Construction Management, 23(12), pp. 2144-2150. ISSN 1562-3599
Ive, G and Chang, C Y (2007) The principle of inconsistent trinity in the selection of procurement systems. Construction Management and Economics, 25(7), pp. 677-690. ISSN 1466433X
Jaafar, M and Radzi, N M (2013) Level of satisfaction and issues with procurement systems used in the Malaysian public sector. Construction Economics and Building, 13(1), pp. 50-65. ISSN 2204-9029
Jackson, J T (1990) Technical specifications' effect on construction. Journal of Construction Engineering and Management, 116(3), pp. 463-467. ISSN 0733-9364
Jafari, D M (2012) Resolution of multiparty construction disputes under the Singapore international arbitration legal framework. PhD thesis, National University of Singapore, Singapore.
Jafarzadeh, R; Ingham, J M; Wilkinson, S; González, V and Aghakouchak, A A (2014) Application of artificial neural network methodology for predicting seismic retrofit construction costs. Journal of Construction Engineering and Management, 140(2): 04013044, ISSN 0733-9364
Jagannathan, M and Delhi, V S K (2022) Identifying focus areas to decode the decision to litigate contractual disputes in construction. Engineering, Construction and Architectural Management, 29(8), pp. 2976-2998. ISSN 0969-9988
Jagannathan, M and Delhi, V S K (2023) Decoding a construction organisation's tendency to litigate: An understanding through financial statements. Built Environment Project and Asset Management, 13(3), pp. 453-470. ISSN 2044-124X
Jagannathan, M and Delhi, V S K (2023) Paths leading contractual disputes to litigation. Built Environment Project and Asset Management, 13(6), pp. 846-861. ISSN 2044-124X
Jagannathan, Murali; Malla, Vijayeta; Delhi, Venkata Santosh Kumar and Renganaidu, Venkatesan (2025) Application of lean for early identification and avoidance of disputes in construction projects. Construction Innovation, 25(6), pp. 1752-1773. ISSN 1471-4175
Jagboro, G O and Alli, O R (1999) A study of the monetary value of extension of time in building project. Journal of Financial Management of Property and Construction, 4(3), pp. 39-46. ISSN 1366-4387
Jallow, A K (2011) Integrated lifecycle requirements information management in construction. PhD thesis, Loughborough University, UK.
Janda, K B and Parag, Y (2013) A middle-out approach for improving energy performance in buildings. Building Research & Information, 41(1), pp. 39-50. ISSN 0961-3218
Jarder, S L N; Garciano, L E O and Maruyama, O (2021) Probable maximum loss of a pipe network due to earthquakes: A case study in iloilo city, Philippines. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 223-237. ISSN 1759-5916
Jarratt, A (2015) Mediation insights: Practical ways to shape the outcome. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 130-134. ISSN 17514304
Jaselskis, E J and Russell, J S (1992) Risk analysis approach to selection of contractor evaluation method. Journal of Construction Engineering and Management, 118(4), pp. 814-821. ISSN 0733-9364
Jaskula, Klaudia (2024) Blockchain-enabled CBIM for lifecycle data provenance. PhD thesis, University College London, UK.
Jayakody, R R J C and Amaratunga, D (2021) Guiding factors for planning public open spaces to enhance coastal cities' disaster resilience to tsunamis. International Journal of Disaster Resilience in the Built Environment, 12(5), pp. 471-483. ISSN 1759-5916
Jefferies, D and Schweber, L (2022) Professional judgement: An institutional logic approach to contractor tender pricing. Buildings & Cities, 3(1), pp. 518-533. ISSN 2632-6655
Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988
Jelodar, M B; Yiu, T W and Wilkinson, S (2015) Systematic representation of relationship quality in conflict and dispute: For construction projects. Construction Economics and Building, 15(1), pp. 89-103. ISSN 2204-9029
Jelodar, M B; Yiu, T W and Wilkinson, S (2016) Relationship-quality judgment model for construction project procurement: A conjoint measurement. Journal of Construction Engineering and Management, 142(7): 4016012, ISSN 0733-9364
Jemli, R (2020) The importance of natural disasters' governance for macroeconomic performance and countries resilience. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 387-399. ISSN 1759-5916
Jensen, D A and Patterson, J E (2011) Janus head of liquidated damages: Does public policy influence United States courts regarding enforceability of a liquidating damages clause? International Journal of Construction Education and Research, 7(2), pp. 143-156. ISSN 1557-8771
Jergeas, G F and Hartman, F T (1994) Contractors' construction-claims avoidance. Journal of Construction Engineering and Management, 120(3), pp. 553-560. ISSN 0733-9364
Jha, K N (2004) Factors for the success of a construction project: empirical study. PhD thesis, Indian Institute of Technology Delhi, India.
Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(4), pp. 409-421. ISSN 1466433X
Jia, J and Wu, M (2025) Examining the effectiveness of knowledge governance mechanisms in mobile messaging groups within construction project teams. Engineering, Construction and Architectural Management, 32(8), pp. 5019-5039. ISSN 0969-9988
Jia, M and Zhao, L (2025) Evolutionary analysis of information-based construction management promotion using a government-enterprise evolutionary game model. Engineering, Construction and Architectural Management, 32(1), pp. 349-373. ISSN 0969-9988
Jiang, S and Jia, J (2026) Bolstering the initiative of construction project members: A self-determination lens combining project social media use. Engineering, Construction and Architectural Management, 33(1), pp. 452-476. ISSN 0969-9988
Jiang, W.; Jiang, J.; Martek, I. and Jiang, W. (2025) Critical risk management strategies for the operation of public–private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988
Jiang, S and Li, J (2025) Impact of person-environment fit on construction project managers' turnover intention: A moderated mediation model. Engineering, Construction and Architectural Management, 32(4), pp. 2487-2506. ISSN 0969-9988
Jiang, W; Jiang, J; Martek, I and Jiang, W (2025) Critical risk management strategies for the operation of public-private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988
Jiang, W; Jiang, J; Martek, I and Jiang, W (2025) Critical risk management strategies for the operation of public-private partnerships: A vulnerability perspective of infrastructure projects. Engineering, Construction and Architectural Management, 32(7), pp. 4771-4795. ISSN 0969-9988
Jin, R; Han, S; Hyun, C and Cha, Y (2016) Application of case-based reasoning for estimating preliminary duration of building projects. Journal of Construction Engineering and Management, 142(2): 04015082, ISSN 0733-9364
Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531
Johnston, D and Miles-Shenton, D (2009) Airtightness of UK dwellings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Jolly Cyril, E (2026) Mediating effect of innovation on the relationship between project financing and construction cost efficiency: Innovation integrated cost efficiency perspective. Journal of Construction Engineering and Management, 152(1): 04025226, ISSN 0733-9364
Jones III, R C (1991) An economic analysis of national society of professional engineers versus United States. PhD thesis, University of California, Los Angeles, USA.
Jorge, J (1990) Model of uniform cost policies and procedures for the establishment of construction equipment rates. PhD thesis, University of Florida, USA.
Joseph, S; Ralwala, A; Wachira-Towey, I and Mutisya, E (2023) Sustainable construction transition (SCT) policy regime in Kenya. Journal of Construction Business and Management, 6(1), pp. 1-16. ISSN 2521-0165
Ju, L; Ji, Y P; Wu, C; Ning, X and He, Y (2024) Relationship between abusive supervision and workers' well-being in construction projects: Effects of guanxi closeness and trust in managers. Engineering, Construction and Architectural Management, 31(8), pp. 3429-3451. ISSN 0969-9988
Ju, L; Zhao, W; Wu, C; Li, H and Ning, X (2020) Abusive supervisors and employee work-to-family conflict in Chinese construction projects: How does family support help? Construction Management and Economics, 38(12), pp. 1158-1178. ISSN 01446193
Juliana, A; Oladimeji, O; Abiodun, A O; Haddad, A N and Tam, V W Y (2024) Influence of rework on construction project performance in Nigeria. International Journal of Construction Management, 24(8), pp. 888-893. ISSN 1562-3599
Jung, Y J (2007) Subsurface utility engineering for highway projects: A study of utility impact rating and benefit-cost analysis. PhD thesis, Pennsylvania State University, USA.
Kagan, H A; Leary, D J and Pratter, G E K (1986) Design engineers' responsibilities during construction. Journal of Construction Engineering and Management, 112(3), pp. 394-402. ISSN 0733-9364
Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept. PhD thesis, Pennsylvania State University, USA.
Kallman, J W (1998) Loss control project decision models for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.
Kamani-Fard, A; Ahmad, M H and Ossen, D R (2012) The sense of place in the new homes of post-Bam earthquake reconstruction. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 220-236. ISSN 1759-5916
Kamardeen, I (2007) A fuzzy knowledge-based system for premium-rating of workers' compensation insurance for construction projects. PhD thesis, National University of Singapore, Singapore.
Kamardeen, I (2022) Work stress related cardiovascular diseases among construction professionals. Built Environment Project and Asset Management, 12(2), pp. 223-242. ISSN 2044-124X
Kamardeen, I and Hasan, A (2022) Occupational health and safety implications of an aging workforce in the Australian construction industry. Journal of Construction Engineering and Management, 148(10): 04022112, ISSN 0733-9364
Kang, F; Shi, Y; Li, J and Zhang, H (2025) Impacts of leader anger expressions on newcomer proactive career behavior and work alienation in the construction industry. Engineering, Construction and Architectural Management, 32(6), pp. 3659-3678. ISSN 0969-9988
Kangari, R (1995) Construction documentation in arbitration. Journal of Construction Engineering and Management, 121(2), pp. 201-208. ISSN 0733-9364
Kangari, R and Bakheet, M (2001) Construction surety bonding. Journal of Construction Engineering and Management, 127(3), pp. 232-238. ISSN 0733-9364
Karamoozian, A and Wu, D (2020) A hybrid risk prioritization approach in construction projects using failure mode and effective analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2661-2686. ISSN 0969-9988
Karimi, Rozi (2026) The impact of social media use on team feedback and team performance in construction site management practices. PhD thesis, Monash University, Australia.
Karnasuta, P (2004) An examination of the effects of web-based virtual working environments on team effectiveness within construction projects. PhD thesis, University of Reading, UK.
Kartam, S (1999) Generic methodology for analyzing delay claims. Journal of Construction Engineering and Management, 125(6), pp. 409-419. ISSN 0733-9364
Kashiwagi, D and Byfield, R (2002) State of Utah performance information procurement system tests. Journal of Construction Engineering and Management, 128(4), pp. 338-347. ISSN 0733-9364
Kashiwagi, D T (2002) Application of information measurement theory (IMT) to construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kashiwagi, K; Rubin, R A and Harris, M R (1988) Construction law and practice in Japan. Journal of Construction Engineering and Management, 114(1), pp. 104-113. ISSN 0733-9364
Kassab, M; Hegazy, T and Hipel, K (2010) Computerized DSS for construction conflict resolution under uncertainty. Journal of Construction Engineering and Management, 136(12), pp. 1249-1257. ISSN 0733-9364
Kassab, M; Hipel, K and Hegazy, T (2006) Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132(10), pp. 1043-1052. ISSN 0733-9364
Kaur, P; Ritu, R K and Kaur, A (2024) Unraveling consumer behavioral intentions to adopt solar water heaters in India using utaut model. Built Environment Project and Asset Management, 14(2), pp. 312-328. ISSN 2044-124X
Kavaarpuo, G; Tiwari, P and Martel, A (2026) Transaction costs and innovation outcomes: Lessons from early adopters of housebuilding innovations. Construction Innovation, 26(1), pp. 236-259. ISSN 1471-4175
Kayaga, S (2008) Public-private delivery of urban water services in Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 147-155. ISSN 17514312
Ke, Y (2020) Impact of trust on the performance of construction enterprises: analysis of the cooperative process mechanism in the context of Chaoshan culture. DProf thesis, Fordham University, USA.
Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.
Keevil, P S (1998) Feasibility of representing selected elements of the 1985 building regulations in prolog or other rule-based form. PhD thesis, Open University, UK.
Kennedy, P and Milligan, J L (2000) Cost of the adjudication process in the UK since the introduction of the Housing Grants, Construction and Regeneration Act 1996. Journal of Financial Management of Property and Construction, 5(3), pp. 171-180. ISSN 1366-4387
Kennedy, P; Morrison, A and Milne, D O (1997) Resolution of disputes arising from set-off clauses between main contractors and subcontractors. Construction Management and Economics, 15(6), pp. 527-537. ISSN 01446193
Khalafallah, A and Shalaby, Y (2019) Change orders: Automating comparative data analysis and controlling impacts in public projects. Journal of Construction Engineering and Management, 145(11): 04019064, ISSN 0733-9364
Khalfan, M M A; McDermott, P and Maqsood, T (2005) Achieving supply chain integration through demand and supply management. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Khallaf, R; Naderpajouh, N and Hastak, M (2018) A systematic approach to develop risk registry frameworks for complex projects. Built Environment Project and Asset Management, 8(4), pp. 334-347. ISSN 2044-124X
Khan, A N and Kwan, H K (2025) AI, agility, and environmental performance: A new framework for construction project managers. Journal of Construction Engineering and Management, 151(3): 04025003, ISSN 0733-9364
Khan, N A; Hui, Z; Khan, A N and Soomro, M A (2022) Impact of women authentic leadership on their own mental wellbeing through ego depletion: Moderating role of leader's sense of belongingness. Engineering, Construction and Architectural Management, 29(10), pp. 4191-4214. ISSN 0969-9988
Khan, N A and Khan, A N (2022) Exploring the impact of abusive supervision on employee' voice behavior in Chinese construction industry: A moderated mediation analysis. Engineering, Construction and Architectural Management, 29(8), pp. 3051-3071. ISSN 0969-9988
Khawaja, E U R and Mustapha, A (2021) Mitigating disputes and managing legal issues in the era of building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 111-130. ISSN 1823-6499
Khazaeni, G and Khazaeni, A (2026) Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm. International Journal of Building Pathology and Adaptation, 44(1), pp. 208-222. ISSN 2398-4708
Khurana, M; Garvin, M J and Mahalingam, A (2022) Synthesis of relational practices for PPP contracts and their linkage with governance mechanisms. Journal of Construction Engineering and Management, 148(12): 04022131, ISSN 0733-9364
Khurana, Mayank (2021) Investigation of contractual specification and implementation of relational approaches in public private partnership (PPP) projects. PhD thesis, Virginia Tech, USA.
Kidd, A; Appelbe, S and Morgan, A (2015) The use and abuse of programmes in construction contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 294-301. ISSN 17514304
Kilian, J J and Gibson, G E (2005) Construction litigation for the U.S. Naval facilities engineering command, 1982-2002. Journal of Construction Engineering and Management, 131(9), pp. 945-952. ISSN 0733-9364
Kim, D. H. and Jeong, J. H. (2026) Development of a decision-making framework to prioritize expressway pavement sections for large-scale repairs. Journal of Construction Engineering and Management, 152(8): 04026106, ISSN 0733-9364
Kim, Y W and Rhee, B D (2026) An incentive scheme in GMP contracts using a game theory approach. Journal of Construction Engineering and Management, 152(4): 04026016, ISSN 0733-9364
Kim, J (2022) A multimodal approach to improve fire safety on construction sites. PhD thesis, Oklahoma State University, USA.
Kim, J; Shan, Y; Kim, S; Song, D; Park, H and Bang, C (2021) Factors influencing fire safety on building construction sites: A fire officer's perspective. Journal of Construction Engineering and Management, 147(10): 04021118, ISSN 0733-9364
Kim, M (2017) Noncontact quality assessment of precast concrete elements using 3D laser scanning and building information modeling. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Kim, S Y; Nguyen, M V and Dao, T T N (2021) Prioritizing complexity using fuzzy DANP: Case study of international development projects. Engineering, Construction and Architectural Management, 28(4), pp. 1114-1133. ISSN 0969-9988
Kineber, A F; Oke, A E; Ali, A H; Dosumu, O; Fakunle, K and Olanrewaju, O I (2025) Critical application areas of radio frequency identification (RFID) technology for sustainable construction in developing countries: The case of Nigeria. Journal of Engineering, Design and Technology, 23(3), pp. 895-916. ISSN 1726-0531
Kineber, A F; Othman, I; Oke, A E; Chileshe, N and Zayed, T (2024) Modeling the relationship between value management implementation phases, critical success factors and overall project success. Construction Innovation, 24(5), pp. 1380-1400. ISSN 1471-4175
Kings, S (2002) Pricing documentation for contractors' estimators: Establishing a more effective approach. PhD thesis, Nottingham Trent University, UK.
Kitschker, A D and Swaffield, L M (2003) Examination of relationships between Egan's key drivers of change and mechanical and electrical contractors' profits. Journal of Financial Management of Property and Construction, 8(2), pp. 99-110. ISSN 1366-4387
Klimas, E (2011) A general duty to co-operate in construction contracts? An international review. International Journal of Law in the Built Environment, 3(1), pp. 83-96. ISSN 1756-1450
Ko, T; Lee, J and David Jeong, H (2024) Project requirements prioritization through NLP-driven classification and adjusted work items analysis. Journal of Construction Engineering and Management, 150(3): 04023171, ISSN 0733-9364
Koc, K and Gurgun, A P (2022) Ambiguity factors in construction contracts entailing conflicts. Engineering, Construction and Architectural Management, 29(5), pp. 1946-1964. ISSN 0969-9988
Koc, K and Pelin Gurgun, A (2021) Assessment of readability risks in contracts causing conflicts in construction projects. Journal of Construction Engineering and Management, 147(6): 20202277, ISSN 0733-9364
Koch, C and Bendixen, M (2005) Multiple perspectives on organizing: Projects between tyranny and perforation. Building Research & Information, 33(6), pp. 536-546. ISSN 0961-3218
Kog, Y C and Loh, P K (2012) Critical success factors for different components of construction projects. Journal of Construction Engineering and Management, 138(4), pp. 520-528. ISSN 0733-9364
Koirala, M P; Thapa, N; Giri, O P and Sha, R K (2025) Evaluation of variation orders on road construction projects in rural Nepal. Construction Economics and Building, 25(3-4), pp. 311-338. ISSN 2204-9029
Kokkonen, A (2017) Integrated project emerging within the daily project life through active participation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Komendantova, N; Scolobig, A; Garcia-Aristizabal, A; Monfort, D and Fleming, K (2016) Multi-risk approach and urban resilience. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 114-132. ISSN 1759-5916
Konanahalli, Ashwini Prakash (2013) Critical factors influencing British expatriates' success on international architectural, engineering and construction assignments in Sub-Saharan Africa, China, middle East and Indian sub-continent. PhD thesis, Queen's University Belfast, UK.
Koneswaran, B; Siriwardana, C and Jayasekara, R U (2022) Development of flood vulnerability curves for Sri Lankan hospitals. International Journal of Disaster Resilience in the Built Environment, 13(1), pp. 99-112. ISSN 1759-5916
Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029
Kong, D; Tiong, R L K; Cheah, C Y J; Permana, A and Ehrlich, M (2008) Assessment of credit risk in project finance. Journal of Construction Engineering and Management, 134(11), pp. 876-884. ISSN 0733-9364
Kong, T-M S (2011) Organizational culture of safety in the Hong Kong construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Konno, Y (2014) Default or exit? Empirical study on SMEs in the Japanese construction industry. Construction Management and Economics, 32(10), pp. 1017-1029. ISSN 01446193
Konno, Y (2015) Analysing Japanese contractor activity on the basis of panel data. Engineering, Construction and Architectural Management, 22(4), pp. 390-402. ISSN 0969-9988
Kourkoulis, S K; Pasiou, E D; Markides, C F; Loukidis, A; Stavrakas, I and Triantis, D (2024) The determination of mode-I fracture toughness (by means of the Brazilian disc configuration) in the light of data provided by the 3D digital image correlation technique. International Journal of Building Pathology and Adaptation, 42(1), pp. 175-192. ISSN 23984708
Kpamma, Z E; Adjei-Kumi, T; Ayarkwa, J and Adinyira, E (2018) Choosing by advantages incorporated framework for a user-involved design process. Architectural Engineering and Design Management, 14(3), pp. 194-217. ISSN 1745-2007
Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.
Krone, S J (1991) Decreasing the impact of changes. DSc thesis, George Washington University, USA.
Kuitert, L; Volker, L and Hermans, M H (2017) Public commissioning in a new era: Public value interests of construction clients. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kulkarni, S S; Chapman, C; Shah, H and Edwards, D J (2018) A computational design method for bio-mimicked horizontal axis tidal turbines. International Journal of Building Pathology and Adaptation, 36(2), pp. 188-209. ISSN 23984708
Kululanga, G K and Price, A D F (2005) Measuring quality of writing of construction specifications. Journal of Construction Engineering and Management, 131(8), pp. 859-865. ISSN 0733-9364
Kumar, R (2020) Risk management framework for construction projects aligned to actualities. PhD thesis, Indian Institute of Technology Delhi, India.
Kumar, R; Chandrashekhar, I K and Singh, S P (2017) Quantification of construction project risks by analysis of past dispute cases. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kumar, R; Iyer, K C and Singh, S P (2021) Understanding relationship between risks and claims for assessing risks with project data. Engineering, Construction and Architectural Management, 28(4), pp. 1014-1037. ISSN 0969-9988
Kumar, V S S (1993) Application of fuzzy set theory in construction management. PhD thesis, Indian Institute of Technology Delhi, India.
Kumaraswamy, M M (1996) The pursuit of quality in Hong Kong construction. Engineering, Construction and Architectural Management, 3(4), pp. 289-306. ISSN 0969-9988
Kumaraswamy, M M (1997) Conflicts, claims and disputes in construction. Engineering, Construction and Architectural Management, 4(2), pp. 95-111. ISSN 0969-9988
Kumaraswamy, M M (1998) Industry development through creative project packaging and integrated management. Engineering, Construction and Architectural Management, 5(3), pp. 228-237. ISSN 0969-9988
Kumaraswamy, M M; Nadarajah, R; Palaneeswaran, E and Rahman, M M (2001) Dealing with delays in evaluating extensions of time. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kuo, Vincent (2019) Latent semantic analysis for knowledge management in construction. DSc(Tech) thesis, Aalto University, Finland.
Kuru, K and Artan, D (2020) A canvas model for risk assessment and performance estimation in public-private partnerships. International Journal of Construction Management, 20(6), pp. 704-719. ISSN 1562-3599
Kwon, N; Cho, J; Lee, H S; Yoon, I and Park, M (2019) Compensation cost estimation model for construction noise claims using case-based reasoning. Journal of Construction Engineering and Management, 145(8): 04019047, ISSN 0733-9364
Kwon, N; Park, M; Lee, H S; Ahn, J and Kim, S (2017) Construction noise prediction model based on case-based reasoning in the preconstruction phase. Journal of Construction Engineering and Management, 143(6): 04017008, ISSN 0733-9364
Kwon, N; Park, M; Lee, H S; Ahn, J and Shin, M (2016) Construction noise management using active noise control techniques. Journal of Construction Engineering and Management, 142(7): 4016014, ISSN 0733-9364
Kwon, N; Song, K; Lee, H S; Kim, J and Park, M (2018) Construction noise risk assessment model focusing on construction equipment. Journal of Construction Engineering and Management, 144(6): 04018034, ISSN 0733-9364
Kyalisiima, C; Tutesigensi, A and Kayondo, M (2022) Is the competence of internal stakeholders in construction projects an antidote to construction contract disputes? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. PhD thesis, Cardiff University, UK.
Lal, H (1999) The use of characteristic productivity modelling in the improvement of site performance and the evaluation of delay and disruption claims. PhD thesis, University of Dundee, UK.
Lal, H (2009) Disputes under the UK's 'new' Construction Act. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 151-155. ISSN 17514312
Lal, H (2013) Nuclear decommissioning contracts: The legal and commercial issues. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 94-102. ISSN 17514304
Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Lam, P T I (2004) An investigation into the use of specifications in procuring construction works. Journal of Construction Procurement, 10(2),
Lamb, D J and Merna, T (2004) Reappraisal of public private partnerships: An overview of refinancing, restructuring and termination. Journal of Financial Management of Property and Construction, 9(3), pp. 155-162. ISSN 1366-4387
Lamirande, M (2023) Exploring practices and understandings of designing inclusively. PhD thesis, Open University, UK.
Lan, Roy Uzoma (2025) Advancing workplace safety through intelligent monitoring: Applications of artificial intelligence and computer vision in high-risk industrial environments. PhD thesis, The University of Texas at San Antonio, USA.
Lane, P M M (2012) Can construction arbitration learn from adjudication? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 35-39. ISSN 17514312
Lane, P M M and Watson, M J (2010) Effectiveness of dispute adjudication boards, South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 171-177. ISSN 17514312
Lappalainen, E; Uusitalo, P; Seppänen, O; Peltokorpi, A; Ainamo, A and Reinbold, A (2024) User experiences of situational awareness systems in infrastructure construction. Construction Management and Economics, 42(11-12), pp. 1012-1025. ISSN 01446193
Laryea, S (2011) Quality of tender documents: Case studies from the UK. Construction Management and Economics, 29(3), pp. 275-286. ISSN 1466433X
Laryea, S (2016) Compensation events in NEC3 contracts: Case studies from South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 49-64. ISSN 17514304
Laryea, S A and Hughes, W P (2009) Commercial reviews in the tender process of contractors. Engineering, Construction and Architectural Management, 16(6), pp. 558-572. ISSN 0969-9988
Lashgari, Martin (2014) Comparative study of base-isolated and fixed-base buildings using a damage/cost approach. PhD thesis, University of Nebraska - Lincoln, USA.
Lau, C H; Mesthrige, J W; Lam, P T I and Javed, A A (2019) The challenges of adopting new engineering contract: A Hong Kong study. Engineering, Construction and Architectural Management, 26(10), pp. 2389-2409. ISSN 0969-9988
Lau, E and Rowlinson, S (2005) The value base of trust for the construction industry. Journal of Construction Procurement, 11(1),
Lau, J L and Hashim, A H (2020) Mediation analysis of the relationship between environmental concern and intention to adopt green concepts. Smart and Sustainable Built Environment, 9(4), pp. 539-556. ISSN 2046-6099
Lavers, A P (1986) Professional negligence in the property-related professions. PhD thesis, National University of Singapore, Singapore.
Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364
Le, Ngoc Quyet (2021) Building information modelling (BIM) adoption and implementation: Interaction between BIM specialists and non-BIM specialists in Vietnam. PhD thesis, University of Technology Sydney, Australia.
Le, P T; Chileshe, N; Kirytopoulos, K and Rameezdeen, R (2020) Investigating the significance of risks in BOT transportation projects in Vietnam. Engineering, Construction and Architectural Management, 27(6), pp. 1401-1425. ISSN 0969-9988
Le, P T; Kirytopoulos, K; Chileshe, N and Rameezdeen, R (2022) Taxonomy of risks in PPP transportation projects: A systematic literature review. International Journal of Construction Management, 22(2), pp. 166-181. ISSN 1562-3599
Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304
Lee, C K; Yiu, T W and Cheung, S O (2021) Predicting intention to use alternative dispute resolution (ADR): An empirical test of theory of planned behaviour (TPB) model. International Journal of Construction Management, 21(1), pp. 27-40. ISSN 1562-3599
Lee, C Y; Chong, H Y; Tanko, B L and Klufallah, M (2022) Effect between trust in communication technology and interorganizational trust in BIM-enabled projects. Journal of Construction Engineering and Management, 148(8): 04022059, ISSN 0733-9364
Lee, G; Moon, S and Chi, S (2023) Reference section identification of construction specifications by a deep structured semantic model. Engineering, Construction and Architectural Management, 30(9), pp. 4358-4386. ISSN 0969-9988
Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.
Lee, J S (2016) Estimating cumulative damages due to disruptions in repetitive construction. Journal of Construction Engineering and Management, 142(11): 04016064, ISSN 0733-9364
Lee, J S (2023) Quantifying costs of the productivity loss due to schedule changes in construction projects. Engineering, Construction and Architectural Management, 30(1), pp. 56-73. ISSN 0969-9988
Lee, K R and Fenn, P (2007) Investigation of critical factors affecting successful mediation: Korean mediation users perspectives. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Lee, W (2018) Use of wearable sensors to unveil roles of task demands-personal resources and burnout on performance of construction workers. PhD thesis, University of Washington, USA.
Lee, Z P; Rahman, R A and Doh, S I (2021) Key drivers for adopting design-build in public construction projects: Malaysian perspective. Journal of Construction in Developing Countries, 26(1), pp. 131-160. ISSN 1823-6499
Lei, Z; Han, S; Bouferguène, A; Taghaddos, H; Hermann, U and Al-Hussein, M (2015) Algorithm for mobile crane walking path planning in congested industrial plants. Journal of Construction Engineering and Management, 141(2): 05014016, ISSN 0733-9364
Lello, D; Huang, Y; Emuze, F and Alananga, S (2024) Professional knowledge infusion and service performance within outbound consultant-supplier interfaces in Tanzania's construction industry: Can networking and stakeholder support play cards? International Journal of Construction Management, 24(15), pp. 1643-1654. ISSN 1562-3599
Lensgraf, S E (2024) Towards scalable autonomous underwater construction with free-floating robots. PhD thesis, Dartmouth College, USA.
Leon, M (2015) Development of a computer mediated multidisciplinary design protocol and its application to the early architectural design stages. PhD thesis, Robert Gordon University, UK.
Leontaris, G (2021) Decision making under uncertainty for construction management of offshore wind assets. PhD thesis, Delft University of Technology, Netherlands.
Lessani, A (2016) Decision analysis in construction claims. PhD thesis, University of Maryland, College Park, USA.
Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193
Leung, M Y; Bowen, P; Liang, Q and Famakin, I (2015) Development of a job-stress model for construction professionals in south Africa and Hong Kong. Journal of Construction Engineering and Management, 141(2): 04014077, ISSN 0733-9364
Leung, M Y; Chan, Y S; Chong, A and Sham, J F C (2008) Developing structural integrated stressor-stress models for clients' and contractors' cost engineers. Journal of Construction Engineering and Management, 134(8), pp. 635-643. ISSN 0733-9364
Leung, M y; Wong, M k and Oloke, D (2003) Coping behaviours of construction estimators in stress management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Leung, R H M and Hui, B T F (2020) Success in construction mediation in Hong Kong, China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(3), pp. 114-119. ISSN 17514304
Lhee, S C; Issa, R R A and Flood, I (2012) Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks. Journal of Construction Engineering and Management, 138(1), pp. 22-30. ISSN 0733-9364
Li, J.; Sun, J.; Cao, J. and Mao, L. (2026) Evolutionary dynamics of multiagent on-chain adoption strategies in blockchain-enabled smart construction. Journal of Construction Engineering and Management, 152(8): 04026113, ISSN 0733-9364
Li, X.; Lin, M.; Chen, J. and Jim, C. Y. (2026) A lifecycle-based risk assessment framework for prefabricated building supply chains using G1-entropy weight and cloud matter-element models. Engineering, Construction and Architectural Management, 33(7), pp. 5645-5674. ISSN 0969-9988
Li, D; Zhou, H; Zhou, S; Huang, G; Ma, X; Zhao, Y; Wang, W and Ng, S T (2025) An eye-tracking-based approach to evaluate the usability of government portal websites in pilot smart cities. Engineering, Construction and Architectural Management, 32(4), pp. 2369-2396. ISSN 0969-9988
Li, G; Chen, C; Zhang, G and Martek, I (2020) Bid/no-bid decision factors for Chinese international contractors in international construction projects. Engineering, Construction and Architectural Management, 27(7), pp. 1619-1643. ISSN 0969-9988
Li, H; Arditi, D and Wang, Z (2012) Transaction-related issues and construction project performance. Construction Management and Economics, 30(2), pp. 151-164. ISSN 1466433X
Li, J; Mao, L and Cao, J (2025) Process model for claim and payment management in a construction supply chain based on smart contracts. Journal of Construction Engineering and Management, 151(11): 04025172, ISSN 0733-9364
Li, K and Cheung, S O (2016) The potential of bias in multi-tier construction dispute resolution processes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Li, K and Cheung, S O (2019) Unveiling cognitive biases in construction project dispute resolution through the lenses of third-party neutrals. Journal of Construction Engineering and Management, 145(11): 04019070, ISSN 0733-9364
Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.
Li, S; Cai, H and Kamat, V R (2016) Integrating natural language processing and spatial reasoning for utility compliance checking. Journal of Construction Engineering and Management, 142(12): 04016074, ISSN 0733-9364
Li, S; Fan, M and Wu, X (2018) Effect of social capital between construction supervisors and workers on workers' safety behavior. Journal of Construction Engineering and Management, 144(4): 04018014, ISSN 0733-9364
Li, S; Wu, X; Wang, X and Hu, S (2020) Relationship between social capital, safety competency, and safety behaviors of construction workers. Journal of Construction Engineering and Management, 146(6): 04020059, ISSN 0733-9364
Li, W X (2015) A performance management methodology for collaborative design and construction project teams. PhD thesis, Stanford University, USA.
Li, X; Han, S; Gül, M; Al-Hussein, M and El-Rich, M (2018) 3D visualization-based ergonomic risk assessment and work modification framework and its validation for a lifting task. Journal of Construction Engineering and Management, 144(1): 04017093, ISSN 0733-9364
Li, X; Li, H; Zhang, R; Yin, Y; Sun, S; Bai, J and Liu, R (2024) Impact of asymmetric trust on construction project management performance: The mediating role of knowledge sharing. Engineering, Construction and Architectural Management, 31(11), pp. 4538-4561. ISSN 0969-9988
Li, X; Yuan, J; Liu, X; Wang, G and Wang, Q C (2024) The effects of joint-contract functions on PPP project value creation: A mediation model. Engineering, Construction and Architectural Management, 31(10), pp. 4162-4183. ISSN 0969-9988
Li, X; Zhang, Z; Jim, C Y; Lai, J and Chen, X (2023) Owner-based benefit evaluation of bim applications in China's engineering projects. Engineering, Construction and Architectural Management, 30(9), pp. 4387-4414. ISSN 0969-9988
Li, Y (2021) An investigation of organizational control in design consulting projects: behavioural consequences and motivational mechanisms. PhD thesis, University of Hong Kong, Hong Kong.
Li, Y; Nie, X and Chen, S (2007) Fuzzy approach to prequalifying construction contractors. Journal of Construction Engineering and Management, 133(1), pp. 40-49. ISSN 0733-9364
Liang, E.; Li, H. and Xinxu, S. (2026) How digital government influences firms' ESG performance in Chinese construction industry? A cross-boundary collaboration perspective. Engineering, Construction and Architectural Management, pp. 1-30. ISSN 0969-9988
Liang, H.; Yang, D. and Cong, W. (2026) The impact of mindful organizing on construction safety violations: A moderated mediation model. Journal of Construction Engineering and Management, 152(6): 04026066, ISSN 0733-9364
Liang, Houhao (2024) Unmanned ground vehicle-driven indoor monitoring: Enhancing routine data acquisition and on-site deployment. PhD thesis, National University of Singapore, Singapore.
Liang, S (2013) Legal aspects of privately financed infrastructure projects (PFIPs) in China: the case for international standards. PhD thesis, University of Leeds, UK.
Liang, Y and Ashuri, B (2022) Challenges and enabling features of small and medium infrastructure public-private partnerships (p3s): A case study of the US P3 infrastructure market. Engineering, Construction and Architectural Management, 29(1), pp. 49-71. ISSN 0969-9988
Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364
Liao, L; Ye, Y; Wei, N; Li, H and Fan, C (2024) Exploring blockchain technology acceptance among non-managerial construction practitioners in Shenzhen, China. Engineering, Construction and Architectural Management, 31(5), pp. 2053-2076. ISSN 0969-9988
Liao, M C; Hsieh, T Y and Wang, W H (2024) Management of gross negligence manslaughter liability construction for professionals and lessons learned. Engineering, Construction and Architectural Management, 31(12), pp. 4942-4954. ISSN 0969-9988
Liao, X; Lee, C Y and Chong, H Y (2020) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27(1), pp. 227-244. ISSN 0969-9988
Lim, T (2009) Essence of time in construction contracts. Construction Economics and Building, 9(2), pp. 1-6. ISSN 2204-9029
Lin, F.; Cheng, Y. and Zhang, J. (2026) Efficient rebar layout estimation enabled by a custom detection network and enhanced visual measurement. Journal of Construction Engineering and Management, 152(9): 04026152, ISSN 0733-9364
Lin, S and Cheung, S O (2022) Exploring the concept of psychological distance and its impact on intention to settle in construction dispute negotiation. Journal of Construction Engineering and Management, 148(12): 04022133, ISSN 0733-9364
Lin, S and Cheung, S O (2022) Intention to settle as an indispensable element of negotiated construction dispute settlement. Journal of Construction Engineering and Management, 148(10): 04022113, ISSN 0733-9364
Lin, S and Cheung, S O (2025) What organizational justice brings to project dispute negotiation. Journal of Construction Engineering and Management, 151(4): 04025015, ISSN 0733-9364
Lind, H and Borg, L (2010) Service-led construction: Is it really the future? Construction Management and Economics, 28(11), pp. 1145-1153. ISSN 1466433X
Lindebaum, D and Jordan, P J (2012) Relevant but exaggerated: The effects of emotional intelligence on project manager performance in construction. Construction Management and Economics, 30(7), pp. 575-583. ISSN 1466433X
Ling, F and Lim, H L (2007) Foreign firms' financial and economic risk in China. Engineering, Construction and Architectural Management, 14(4), pp. 346-362. ISSN 0969-9988
Lingard, H.; Cooke, T. and Gharaie, E. (2013) A case study analysis of fatal incidents involving excavators in the Australian construction industry. Engineering, Construction and Architectural Management, 20(5), pp. 488-504. ISSN 0969-9988
Lingard, H; Cooke, T and Gharaie, E (2013) The how and why of plant-related fatalities in the Australian construction industry. Engineering, Construction and Architectural Management, 20(4), pp. 365-380. ISSN 0969-9988
Lingard, H and Saunders, A (2004) Occupational rehabilitation in the construction industry of Victoria. Construction Management and Economics, 22(10), pp. 1091-1101. ISSN 01446193
Lingard, H C; Francis, V and Turner, M (2010) Work-family enrichment in the Australian construction industry: Implications for job design. Construction Management and Economics, 28(5), pp. 467-480. ISSN 1466433X
Liu, B; Xue, B; Meng, J; Chen, X and Sun, T (2020) How project management practices lead to infrastructure sustainable success: An empirical study based on goal-setting theory. Engineering, Construction and Architectural Management, 27(10), pp. 2797-2833. ISSN 0969-9988
Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Liu, K; Liu, Y and Kou, Y (2025) External drivers of inter-organizational collaboration in megaproject: A perspective based on project governance. Engineering, Construction and Architectural Management, 32(5), pp. 2920-2941. ISSN 0969-9988
Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.
Liu, M; Zhu, Y; Wei, J; Le, Y and Zhang, X (2022) Impact of institutional pressures on external program manager involvement: Evidence from large projects in China. Journal of Construction Engineering and Management, 148(9): 04022079, ISSN 0733-9364
Liu, Q; Feng, Y and London, K (2020) Conceptual model for managing mental health in the culturally diverse construction workforce. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(1), pp. 128-149. ISSN 0969-9988
Liu, T; Mao, Y and Lu, S (2023) Fostering participants' collaborative innovation performance in megaprojects: The effects of perceived partners' non-mediated power. Journal of Construction Engineering and Management, 149(1): 04022141, ISSN 0733-9364
Liu, Y; Wang, X; Zhang, J and Guo, S (2025) How risk factors lead to the early termination of public–private partnership projects in China: A multi-case study based on social network analysis and interpretive-structure modeling. Engineering, Construction and Architectural Management, 32(2), pp. 824-846. ISSN 0969-9988
Liyanawatta, T N; Francis, M and Ranadewa, K A T O (2024) Avoiding construction disputes: A comprehensive framework for pre-contract planning. International Journal of Construction Management, 24(12), pp. 1282-1294. ISSN 1562-3599
Lizarralde, G.; Wachsmuth, D.; Özdoğan, F. and Cossu, M. (2026) Critical reconstruction theory and the invention of post-disaster response. Buildings & Cities, 7(1), pp. 683-703. ISSN 2632-6655
Lo, T Y J (2021) Innovation management in the construction industry: Innovation performance indicators for AECOO organizations. PhD thesis, Stanford University, USA.
Loganathan, S and Forsythe, P (2020) Unravelling the influence of teamwork on trade crew productivity: A review and a proposed framework. Construction Management and Economics, 38(11), pp. 1040-1060. ISSN 01446193
Loke, M K; Lee, W P and Yap, J B H (2025) Effective practical strategies for statutory adjudication in construction disputes: Perspectives from adjudicators. International Journal of Construction Management, 25(12), pp. 1488-1499. ISSN 1562-3599
London, K A and Cadman, K (2009) Impact of a fragmented regulatory environment on sustainable urban development design management. Architectural Engineering and Design Management, 5(1-2), pp. 5-23. ISSN 1745-2007
Long, W; Wang, X; Liang, Y and Ye, K (2023) Characteristics of collusive practices in bidding: Mixed methods study in China. Journal of Construction Engineering and Management, 149(6): 04023030, ISSN 0733-9364
Lonsdale, J and Lucas, C (2019) The influence of key performance indicators on relationship and performance of joint venture construction projects in the UK. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Loosemore, M and Galea, N (2008) Genderlect and conflict in the Australian construction industry. Construction Management and Economics, 26(2), pp. 125-135. ISSN 1466433X
Loosemore, M; Nguyen, B T and Denis, N (2000) An investigation into the merits of encouraging conflict in the construction industry. Construction Management and Economics, 18(4), pp. 447-456. ISSN 01446193
Lopane, F D (2022) Spatial optimisation for resilient infrastructure services. PhD thesis, University of Newcastle upon Tyne, UK.
Lopez, R and Amara, A (2018) Comparison of dispute boards and statutory adjudication in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 70-78. ISSN 17514304
Lord, W E and Gray, T E (2011) Cost benefit analysis approach to global claims. International Journal of Law in the Built Environment, 3(3), pp. 222-236. ISSN 1756-1450
Love, P; Davis, P; Ellis, J and Cheung, S O (2010) Dispute causation: Identification of pathogenic influences in construction. Engineering, Construction and Architectural Management, 17(4), pp. 404-423. ISSN 0969-9988
Love, P E D; Davis, P; Kerry London, K and Jasper, T (2008) Causal modelling of construction disputes. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Love, P E D; Davis, P R; Chevis, R and Edwards, D J (2011) Risk/reward compensation model for civil engineering infrastructure alliance projects. Journal of Construction Engineering and Management, 137(2), pp. 127-136. ISSN 0733-9364
Love, P E D; Edwards, D J; Irani, Z and Sharif, A (2012) Participatory action research approach to public sector procurement selection. Journal of Construction Engineering and Management, 138(3), pp. 311-322. ISSN 0733-9364
Love, P E D; Manual, P and Li, H (1999) Determining the causal structure of rework influences in construction. Construction Management and Economics, 17(4), pp. 505-517. ISSN 01446193
Lowe, B D; Albers, J; Hayden, M; Lampl, M; Naber, S and Wurzelbacher, S (2020) Review of construction employer case studies of safety and health equipment interventions. Journal of Construction Engineering and Management, 146(4): 04020012, ISSN 0733-9364
Lowe, D J and Leiringer, R (2005) Commercial management in project-based organisations. Journal of Financial Management of Property and Construction, 10(1), pp. 3-18. ISSN 1366-4387
Lowe, J G (2010) Edinburgh trams: A case study of a complex project. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Lu, W (2014) Reliability of Engineering News-Record international construction data. Construction Management and Economics, 32(10), pp. 968-982. ISSN 01446193
Lu, W; Li, Z and Wang, S (2017) The role of justice for cooperation and contract's moderating effect in construction dispute negotiation. Engineering, Construction and Architectural Management, 24(1), pp. 133-153. ISSN 0969-9988
Lu, W; Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(4), pp. 448-463. ISSN 0969-9988
Lu, Z; Liu, J and Bu, Z (2025) Influencing factors of the government's willingness to compensate in the early termination of PPP projects: Based on multiple cases in China. Construction Management and Economics, 43(10), pp. 823-848. ISSN 0144-6193
Lucas, J; Gajjar, D; Loadholt, G and Davis, D (2023) Roofing distributor employee perception: Workforce attraction/retention and need. Construction Economics and Building, 23(3-4), pp. 3-24. ISSN 2204-9029
Luo, M; Hwang, B G; Zhao, X and Deng, X (2025) Investigating the mechanism of international contractors' fraud from a moral perspective: Evidence from Chinese international contractors. Engineering, Construction and Architectural Management, 32(4), pp. 2105-2127. ISSN 0969-9988
Luong Hai, N and Tuan, N A (2023) Modeling of planning function management in Vietnam's public construction works. Built Environment Project and Asset Management, 13(2), pp. 201-216. ISSN 2044-124X
Lurie, J (2008) On-demand performance bonds: Reducing the risk of abuse. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 121-125. ISSN 17514312
Luvara, V G M and Benjamin, M (2025) Unveiling factors influencing the duration of arbitration practice in the Tanzania construction industry. International Journal of Building Pathology and Adaptation, 43(6), pp. 1612-1633. ISSN 2398-4708
Lynch, Peter (2003) Growth-survival tradeoffs of Queensland licensed homebuilders 1986-1996: An event history study. PhD thesis, University of Queensland, Australia.
Lyu, H M; Sun, W J; Shen, S L and Zhou, A N (2020) Risk assessment using a new consulting process in fuzzy AHP. Journal of Construction Engineering and Management, 146(3): 04019112, ISSN 0733-9364
Lützkendorf, T (2020) The role of carbon metrics in supporting built-environment professionals. Buildings & Cities, 1(1), pp. 662-672. ISSN 2632-6655
Lœdre, O; Austeng, K; Haugen, T I and Klakegg, O J (2006) Procurement routes in public building and construction projects. Journal of Construction Engineering and Management, 132(7), pp. 689-696. ISSN 0733-9364
Ma, A (2009) Engineer's role in resolving disputes in offshore projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 191-196. ISSN 17514312
Mackenzie, D I (2010) A review of project controls in the UK and methodologies to improve the processes. DProf thesis, Teesside University, UK.
Madenli, O; Atasoy, G and Dikmen, I (2026) Identification and categorization of defects in construction specifications utilizing natural language processing. Journal of Construction Engineering and Management, 152(5): 04026044, ISSN 0733-9364
Magdub, R H (2006) Application of the lump sum turnkey contracts in Libyan civil law with reference to English law and international practice. PhD thesis, Glasgow Caledonian University, UK.
Magdy, M; Abdel-Monem, M and El Dash, K (2022) Float loss impact on project cost. International Journal of Construction Management, 22(9), pp. 1647-1656. ISSN 1562-3599
Mahalingam, A (2006) Understanding and mitigating institutional costs on global projects. PhD thesis, Stanford University, USA.
Mahalingam, A; Yadav, A K and Varaprasad, J (2015) Investigating the role of lean practices in enabling BIM adoption: Evidence from two Indian cases. Journal of Construction Engineering and Management, 141(7): 5015006, ISSN 0733-9364
Mahammedi, C.; Mahdjoubi, L.; Booth, C.; Butt, T. E. and Al-mhdawi, M. K. S. (2026) The design and validation of a decision support system (DSS) for the preliminary risk assessment of brownfield sites (prabs). Smart and Sustainable Built Environment, 15(3), pp. 1255-1276. ISSN 2046-6099
Mahdavi, A; Mino-Rodriguez, I; Berger, C; Martínez-Muñoz, I and Wagner, A (2025) An exploration of experts' views on the relative importance of indoor-environmental quality parameters. Building Research & Information, 53(1-2), pp. 3-18. ISSN 0961-3218
Mahdavinejad, M; Bemanian, M; Abolvardi, G and Elhamian, S M (2012) Analyzing the state of seismic consideration of architectural non-structural components (ANSCs) in design process (based on IBC). International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 133-147. ISSN 1759-5916
Mahfouz, T; Davlyatov, S and Kandil, A (2016) Analysis of differing site condition litigation reasoning through statistical modeling. International Journal of Construction Education and Research, 12(4), pp. 285-302. ISSN 1557-8771
Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.
Mai, M H (2019) The issue of cultural heritage protection in international investment in the mining and construction sectors. PhD thesis, University of Glasgow, UK.
Mak, S W K (1992) Risk management in construction: A study of subjective judgments. PhD thesis, London, External, UK.
Mak, S W K; Choy, L H T and ho, W K O (2008) Hedonic models, internet-based technologies, and the provision of online property appraisal. Construction Innovation, 8(2), pp. 92-105. ISSN 1471-4175
Makwiranzou, C (2019) Building trust and managing risk between the client, consultant, and contractor in traditional and relational construction projects. PhD thesis, University of Liverpool, UK.
Maleyeff, J.; Dande, K.; Srivichaiin, K. and Weidman, D. (2026) Decision support for sustainable building modifications to mitigate climate risk. Construction Innovation, pp. 1-26. ISSN 1471-4175
Manrique, J D; Al-Hussein, M; Telyas, A and Funston, G (2007) Case study-based challenges of quality concrete finishing for architecturally complex structures. Journal of Construction Engineering and Management, 133(3), pp. 208-216. ISSN 0733-9364
Mante, J (2014) Resolution of construction disputes arising from major infrastructure projects in developing countries: case study of Ghana. PhD thesis, University of Wolverhampton, UK.
Mante, J (2015) Resolving infrastructure-related construction disputes in developing countries: The Ghana experience. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Mante, J; Ndekugri, I; Ankrah, N and Hammond, F (2012) The influence of procurement methods on dispute resolution mechanism choice in construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Maqbool, R and Shaji, A (2026) Quantifying the social loafing led productivity issues in architecture, engineering and construction project teams. Engineering, Construction and Architectural Management, 33(1), pp. 620-640. ISSN 0969-9988
Maqsoom, A; Wazir, S J; Choudhry, R M; Thaheem, M J and Zahoor, H (2020) Influence of perceived fairness on contractors' potential to dispute: Moderating effect of engineering ethics. Journal of Construction Engineering and Management, 146(1): 4019090, ISSN 0733-9364
Marciano, E J (2003) Sustainable development and the cement and concrete industries. PhD thesis, Universite de Sherbrooke, Canada.
Maritz, M J and Putlitz, U (2014) Standard form construction contracts; why the need for regular changes? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Marquardt, G (2017) Economic analysis of contract choice, feelings of entitlement and contract enforcement in relationships governed by incomplete contracts. PhD thesis, University of Edinburgh, UK.
Marques, C P (2004) Selected issues in business and contractual relationships in private construction projects in Canada/China deals. PhD thesis, University of Calgary, Canada.
Marsh, K and Fayek, A R (2010) SuretyAssist: Fuzzy expert system to assist surety underwriters in evaluating construction contractors for bonding. Journal of Construction Engineering and Management, 136(11), pp. 1219-1226. ISSN 0733-9364
Marshall, H (2012) Adjudication enforcement: Partial final determinations and insolvency. International Journal of Law in the Built Environment, 4(1), pp. 60-74. ISSN 1756-1450
Martens, R (2018) An analysis of the relationship between leadership style and lean expressed through respect, proactivity, and innovative work behavior. PhD thesis, University of New Mexico, USA.
Martinez, J C (2010) Methodology for conducting discrete-event simulation studies in construction engineering and management. Journal of Construction Engineering and Management, 136(1), pp. 3-16. ISSN 0733-9364
Martino, Antonello (2017) The historical landscape of ports: From the definition of a methodology for the risk assessment to the identification of guidelines for port heritage preservation. PhD thesis, Politecnico di Bari, Italy.
Martínez Alonso, Wilfrido (2024) An NLP approach to understand construction long text. PhD thesis, Stanford University, USA.
Marx, H (2010) Employers' and agents' perspectives of the condition of the construction industry in South Africa. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Marzouk, M; ElSharkawy, M; Elsayed, P and Eissa, A (2020) Resolving deterioration of heritage building elements using an expert system. International Journal of Building Pathology and Adaptation, 38(5), pp. 721-735. ISSN 23984708
Marzouk, M and Hassouna, M (2019) Quality analysis using three-dimensional modelling and image processing techniques. Construction Innovation, 19(4), pp. 614-628. ISSN 1471-4175
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
Maseko, L and Root, D (2021) Collaborative risk management within the design phase of green buildings. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Mason, J R (2007) The views and experiences of specialist contractors on partnering in the UK. Construction Management and Economics, 25(5), pp. 519-527. ISSN 1466433X
Masoumi, R (2015) A framework for project portfolio formation using a hybrid of multicriteria decision-making methods. PhD thesis, Northeastern University, USA.
Masrom, M D A; Skitmore, M and Bridge, A (2013) Determinants of contractor satisfaction. Construction Management and Economics, 31(7), pp. 761-779. ISSN 1466433X
Masterson, J (2008) Employer perspective of the new Irish public works contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 99-105. ISSN 17514312
Matarneh, S (2024) Construction disputes causes and resolution methods: A case study from a developing country. Journal of Construction in Developing Countries, 29(1), pp. 139-161. ISSN 1823-6499
Mawdesley, M J; Al-Jibouri, S H and Clark-Hughes, J (2002) A proactive control approach to agreeing entitlement to claims in construction. Journal of Financial Management of Property and Construction, 7(1), pp. 41-48. ISSN 1366-4387
May, D; Wilson, O and Skitmore, M (2001) Bid cutting: An empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(4), pp. 250-256. ISSN 0969-9988
Mayouf, M and Gilligan, C (2024) Synthesis towards unveiling the complexity underlying underpayment for subcontractors in construction. Journal of Financial Management of Property and Construction, 29(1), pp. 168-192. ISSN 1366-4387
Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.
McArthur, J (2023) Enrolment, technical mediation, and the obligatory passage point: a socio-technical examination of the Canada Green Building Council. PhD thesis, University of Edinburgh, UK.
McConnell, William J (2026) Termination-for-default risk for construction contractors. PhD thesis, University of Colorado at Denver, USA.
McDonald, P R (1984) Construction claims costing for owners and contractors. Construction Management and Economics, 2(1), pp. 1-12. ISSN 01446193
McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.
McLean, M (2014) A longitudinal analysis of a partial mediation model of employee engagement in a knowledge-intensive firm. PhD thesis, Nottingham Trent University, UK.
McWilliam, Sarah (2022) Global value chain governance dynamics: A co-evolutionary perspective on the transition from relational to modular governance in construction. PhD thesis, University of Sydney, Australia.
Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.
Mei, X; Zhou, X; Xu, F and Zhang, Z (2023) Human intrusion detection in static hazardous areas at construction sites: Deep learning-based method. Journal of Construction Engineering and Management, 149(1): 04022142, ISSN 0733-9364
Memon, S A (2017) Hong Kong relational contracting : an investigation into the attitudes and behaviours of contractors' project teams. PhD thesis, University of Hong Kong, Hong Kong.
Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364
Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364
Meng, Q; Liu, W; Li, Z; Chong, H Y and Li, K (2026) Mindful leadership and construction workers' safety citizenship behavior: A moderated mediation model of team psychological safety, participative safety self-efficacy, and leader-member exchange. Journal of Construction Engineering and Management, 152(2): 04025244, ISSN 0733-9364
Meng, X (2002) Guarantees for contractor's performance and owner's payment in China. Journal of Construction Engineering and Management, 128(3), pp. 232-237. ISSN 0733-9364
Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988
Mestizo Reyes, Rubén D (2018) Political risk and success factors in public-private partnerships at the subnational level: The case of road infrastructure concessions. DBA thesis, Pontificia Universidad Catolica del Peru, Peru.
Mewomo, M C (2019) The construction industry stakeholders preliminary views on the proposed South African prompt payment and statutory adjudication regulations. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Michieka, N M; Razek, N H A and Gearhart, R S (2023) Modelling the impact of oil price changes and investment decisions on construction wages in the U.S. Construction Management and Economics, 41(6), pp. 500-518. ISSN 01446193
Migliaccio, G C; Bogus, S M and Cordova-Alvidrez, A A (2014) Continuous quality improvement techniques for data collection in asset management systems. Journal of Construction Engineering and Management, 140(4): B4013008, ISSN 0733-9364
Miles-Shenton, D; Parker, J; Glew, D and Thomas, F (2025) Quantifying inter-dwelling air exchanges during fan pressurisation tests. Buildings & Cities, 6(1), pp. 239-254. ISSN 2632-6655
Milner, A (2011) Contract interpretation: Potential for relaxing the exclusionary rule. International Journal of Law in the Built Environment, 3(3), pp. 205-221. ISSN 1756-1450
Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.
Min, J U (2004) Supply chain visualization through web services integration. PhD thesis, Stanford University, USA.
Mirzaee, A M; Pourrostam, T; Majrouhi Sardroud, J; Hosseini, M R; Rahnamayiezekavat, P and Edwards, D (2024) Dispute root causes and prevention in Iranian public-private partnership projects: A causal-predictive model. Engineering, Construction and Architectural Management, 31(1), pp. 405-431. ISSN 0969-9988
Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), pp. 26-33. ISSN 1562-3599
Mitropoulos, P and Howell, G (2001) Model for understanding, preventing, and resolving project disputes. Journal of Construction Engineering and Management, 127(3), pp. 223-231. ISSN 0733-9364
Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.
Mohamed, S F (2006) Improving construction site management practices through knowledge management. PhD thesis, Loughborough University, UK.
Mohammadrezaytayebi, S; Sebt, M H and Afshar, M R (2023) Introducing a system dynamic–based model of quality estimation for construction industry subcontractors' works. International Journal of Construction Management, 23(4), pp. 586-595. ISSN 1562-3599
Mohan, S (1990) Expert systems applications in construction management and engineering. Journal of Construction Engineering and Management, 116(1), pp. 87-99. ISSN 0733-9364
Mohyin, N A; Dainty, A R J and Carrillo, P M (2009) Managing knowledge workers commitment in small construction professional firms. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Mokhtari, M and Hosseinian, S M (2025) Optimal outcome sharing among clients, builders, and designers in collaborative construction contracts: Comparing design–bid–build and design–build methods using principal–agent theory. Journal of Construction Engineering and Management, 151(3): 04024212, ISSN 0733-9364
Molenaar, K; Washington, S and Diekmann, J (2000) Structural equation model of construction contract dispute potential. Journal of Construction Engineering and Management, 126(4), pp. 268-276. ISSN 0733-9364
Momtaz, M (2023) Damage life cycle analysis for present and future condition assessments using statistical and machine learning techniques. PhD thesis, George Mason University, USA.
Moon, H; Kim, K; Lee, H S; Park, M; Williams, T P; Son, B and Chun, J Y (2020) Cost performance comparison of design-build and design-bid-build for building and civil projects using mediation analysis. Journal of Construction Engineering and Management, 146(9): 04020113, ISSN 0733-9364
Moon, S and Bernold, L E (1998) Graphic-based human-machine interface for construction manipulator control. Journal of Construction Engineering and Management, 124(4), pp. 305-314. ISSN 0733-9364
Moore, S (2020) RICS professional education and training for quantity surveyors and the extent to which it is relevant in the current UK built environment market. DProf thesis, University of Salford, UK.
Morad, A A and Beliveau, Y J (1991) Knowledge-based planning system. Journal of Construction Engineering and Management, 117(1), pp. 1-12. ISSN 0733-9364
Morgan, J (2009) Housing and security in England and Wales: Casualisation revisited. International Journal of Law in the Built Environment, 1(1), pp. 42-58. ISSN 1756-1450
Morrison, S and Trushell, I (2016) Payment for offsite goods and materials: The Scottish perspective. Construction Management and Economics, 34(10), pp. 679-687. ISSN 0144-6193
Morrow, T K (1998) Effects of selected practices on project cost performance. PhD thesis, University of Texas at Austin, USA.
Mort, J (2009) Adjudication: Possible amendment to the 1996 act. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(2), pp. 51-58. ISSN 17514312
Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364
Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175
Moura, A C M; Morais, C F and Gonçalves Mello, T A (2024) Geodesign and sustainable development goals in the environmental parameterization of the iron quadrangle region, Brazil: An academic experience. International Journal of Building Pathology and Adaptation, 42(2), pp. 294-317. ISSN 23984708
Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.
Moussa, M (2022) Truck tolling for bridges in USA: A new approach for determining a fair toll policy. PhD thesis, New York University Tandon School of Engineering, USA.
Moustafa, I M M (2001) A decision support system for the selection of the optimum contractor. PhD thesis, University of Southampton, UK.
Moyo, T; Mukawa, M; Moyo, C and Chigara, B (2023) Expected competencies of quantity surveyors in Zimbabwe. Journal of Construction in Developing Countries, 28(1), pp. 19-42. ISSN 1823-6499
Moza, A and Paul, V K (2019) Analysis of claims in public works construction contracts in India. Journal of Construction in Developing Countries, 23(2), pp. 7-26. ISSN 1823-6499
Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.
Mulhorn, W L (1987) Sources of conflict as perceived by architects and New Jersey public school officials when involved in a building project. EdD thesis, Temple University, USA.
Mullen, J (2017) The selection of expert witnesses. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 125-130. ISSN 17514304
Munaif, M A (1995) Multiple criteria decision-making in contractor selection and evaluation of construction bids in Saudi Arabia. PhD thesis, University of Missouri - Rolla, USA.
Musenero, L; Baroudi, B and Gunawan, I (2023) Critical issues affecting dispute resolution practice in infrastructure public-private partnerships. Journal of Construction Engineering and Management, 149(3): 04023001, ISSN 0733-9364
Musenero, Leah (2023) Development of an integrated framework for constructive dispute resolution in infrastructure public-private partnership projects. PhD thesis, University of Adelaide, Australia.
Musonda, I and Gambo, N (2021) Mediation effect of partnership on procurement strategy factors influencing sustainable smart housing development, Nigeria. Built Environment Project and Asset Management, 11(3), pp. 454-467. ISSN 2044-124X
Mustaffa, N E and Bowles, G (2004) Dispute avoidance mechanism in partnering arrangements. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Mustaffa, N E and Bowles, G (2005) Investigating the "hard" and "soft" issues of problem resolution in partnering: Defining the research boundaries. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Mutis-Sin, I A (2007) Framework for interpretation of construction concept representations. PhD thesis, University of Florida, USA.
Mwanaumo, E M (2013) An integrated approach to multi-stakeholder interventions in construction health and safety. DPhil thesis, University of Johannesburg, South Africa.
Mwanaumo, E M and Mambwe, M (2019) Effect of management strategies in entrenching organisational safety culture in the electricity industry of Zambia. Journal of Construction Business and Management, 3(1), pp. 27-37. ISSN 2521-0165
Mwelu, N (2020) Compliance and regulatory framework in public procurement of public road construction projects in Uganda. PhD thesis, University of Newcastle, Australia.
Naimi, M (2013) Contract and claim prevention in major projects: a study on petrochemical projects in Iran. PhD thesis, University of Manchester, UK.
Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364
Naji, K K; Gunduz, M and Naser, A F (2022) The effect of change-order management factors on construction project success: A structural equation modeling approach. Journal of Construction Engineering and Management, 148(9): 04022085, ISSN 0733-9364
Nallaperuma-Arachchige, W; Hadiwattege, C and Hulathdoowage, N D (2023) Conflicts with external stakeholders in irrigation construction projects in Sri Lanka: A narrative analysis. International Journal of Construction Management, 23(15), pp. 2570-2582. ISSN 1562-3599
Narain, V (2021) Building the resilience of periurban communities to the impacts of climate change and urbanization. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 115-125. ISSN 1759-5916
Nasaj, M.; Badi, S.; Murtagh, N. and Ding, L. (2025) Collective AI anxiety and team innovative behaviour: The role of coping strategies. Construction Innovation, 26(5), pp. 1469-1497. ISSN 1471-4175
Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.
Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. PhD thesis, University of Alberta, Canada.
Nathan, K V S K (1994) Submission to ICSID in breach of the convention: disputes in international civil engineering contracts. PhD thesis, Queen Mary University of London, UK.
Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), pp. 1225-1229. ISSN 1466433X
Nawaz, A; Jiang, W and Akhtar, S (2025) Exploring the role of servant leadership, teamwork, and organizational learning in the success of construction projects: A focus on project nature as a moderator. Journal of Construction Engineering and Management, 151(10): 04025154, ISSN 0733-9364
Nawaz Khan, A; Khan, N A and Soomro, M A (2020) Influence of ethical leadership in managing human resources in construction companies. Journal of Construction Engineering and Management, 146(11): 04020125, ISSN 0733-9364
Nazlim, B (2012) Resolving construction disputes in Dubai. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 85-90. ISSN 17514312
Ndekugri, I (1999) Performance bonds and guarantees: Construction owners and professionals beware. Journal of Construction Engineering and Management, 125(6), pp. 428-436. ISSN 0733-9364
Ndekugri, I (2016) Late disputes and the NEC3 Engineering and Construction Contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 65-76. ISSN 17514304
Ndekugri, I; Daeche, H and Zhou, D (2013) The project insurance option in infrastructure procurement. Engineering, Construction and Architectural Management, 20(3), pp. 267-289. ISSN 0969-9988
Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: A FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(2), pp. 177-187. ISSN 0969-9988
Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(4), pp. 399-408. ISSN 01446193
Ndekugri, I and Russell, V (2006) Disputing the existence of a dispute as a strategy for avoiding construction adjudication. Engineering, Construction and Architectural Management, 13(4), pp. 380-395. ISSN 0969-9988
Ndekugri, I; Silverio, A K and Mason, J (2024) Enforcing payment obligations under construction contracts by insolvency proceedings. Journal of Financial Management of Property and Construction, 29(3), pp. 372-387. ISSN 1366-4387
Ndekugri, I; Smith, N and Hughes, W P (2007) The engineer under FIDIC's conditions of contract for construction. Construction Management and Economics, 25(7), pp. 791-799. ISSN 1466433X
Ndekugri, I and Turner, A (1994) Building procurement by design and build approach. Journal of Construction Engineering and Management, 120(2), pp. 243-256. ISSN 0733-9364
Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation. PhD thesis, University of Maryland, College Park, USA.
Negash, Y T and Hassan, A M (2020) Construction project success under uncertainty: Interrelations among the external environment, intellectual capital, and project attributes. Journal of Construction Engineering and Management, 146(10): 05020012, ISSN 0733-9364
Neshat, N (2013) Conceptualization, measurement and empirical exploration of selected supply chain risk constructs. DSc thesis, ETH Zürich, Switzerland.
Netto, A M (2001) Third party rights for latent defects in buildings. PhD thesis, King's College London, UK.
Newaz, M T; Davis, P; Jefferies, M and Pillay, M (2020) Examining the psychological contract as mediator between the safety behavior of supervisors and workers on construction sites. Journal of Construction Engineering and Management, 146(1): 04019094, ISSN 0733-9364
Newsham, G; Brand, J; Donnelly, C; Veitch, J; Aries, M and Charles, K (2009) Linking indoor environment conditions to job satisfaction: A field study. Building Research & Information, 37(2), pp. 129-147. ISSN 0961-3218
Ng, P (2011) The use of mediation in preventing homelessness in England. International Journal of Law in the Built Environment, 3(2), pp. 146-158. ISSN 1756-1450
Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Ng, T; Luu, D and Chen, S (2002) Decision criteria and their subjectivity in construction procurement selection. Construction Economics and Building, 2(1), pp. 70-80. ISSN 2204-9029
Ngacho, C (2013) An assessment of the performance of public sector construction projects: An empirical study of projects funded under constituency development fund (CDF) in Western Province Kenya. PhD thesis, University of Delhi, India.
Ngobi, T G; Manga, M; Kibwami, N and Tutesigensi, A (2021) Construction occupational safety and health incident reporting, recording, monitoring and management in Uganda. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Nguyen, M. V.; Khanh, H. D.; Nguyen, K. V. and Nguyen, T. T. H. (2026) Investigation of the impacts of perceived greenwashing on employee loyalty: The mediating role of guilt and frustration. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988
Nguyen, V T; Do, S T; Tran, C N N and van Pham, L (2025) Analysis of interrelationships among constructs of cost overrun causes in consortium projects between construction contractors. International Journal of Construction Management, 25(13), pp. 1596-1608. ISSN 1562-3599
Nguyen, L D and Ibbs, W (2008) Flora: New forensic schedule analysis technique. Journal of Construction Engineering and Management, 134(7), pp. 483-491. ISSN 0733-9364
Nguyen, L D; Kneppers, J; García De Soto, B and Ibbs, W (2010) Analysis of adverse weather for excusable delays. Journal of Construction Engineering and Management, 136(12), pp. 1258-1267. ISSN 0733-9364
Nguyen, L d (2007) The dynamics of float, logic, resource allocation, and delay timing in forensic schedule analysis and construction delay claims. PhD thesis, University of California, Berkeley, USA.
Nguyen, N; Almarri, K and Boussabaine, H (2021) A risk-adjusted decoupled-net-present-value model to determine the optimal concession period of BOT projects. Built Environment Project and Asset Management, 11(1), pp. 4-21. ISSN 2044-124X
Nguyen, P H D; Tran, D Q and Lines, B C (2020) Empirical inference system for highway project delivery selection using fuzzy pattern recognition. Journal of Construction Engineering and Management, 146(12): 04020141, ISSN 0733-9364
Nguyen, T; Chileshe, N; Ho, D T; Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: A typical case study of Vietnam. Built Environment Project and Asset Management, 14(2), pp. 278-295. ISSN 2044-124X
Nguyen, T H; Shehab, T and Gao, Z (2008) Selecting an architecture-engineering team by using fuzzy set theory. Engineering, Construction and Architectural Management, 15(3), pp. 282-298. ISSN 0969-9988
Nguyen, T H D; Chileshe, N and Rameezdeen, R (2018) External stakeholder strategic actions in construction projects: A Vietnamese study. Construction Management and Economics, 36(8), pp. 443-458. ISSN 01446193
Nguyen, T H D; Chileshe, N; Rameezdeen, R and Wood, A (2019) Stakeholder influence pathways in construction projects: Multicase study. Journal of Construction Engineering and Management, 145(9): 05019011, ISSN 0733-9364
Nguyen, T Q; Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(4), pp. 704-728. ISSN 23984708
Nguyen, V U (1985) Tender evaluation by fuzzy sets. Journal of Construction Engineering and Management, 111(3), pp. 231-243. ISSN 0733-9364
Ni, G; Fang, Y; Miao, X; Qiao, Y; Wang, W and Xuan, J (2025) Can work-family balance reduce the unsafe behavior of new generation of construction workers effectively in China? A moderated mediation model. Engineering, Construction and Architectural Management, 32(9), pp. 5682-5715. ISSN 0969-9988
Ni, G; Zhang, Q; Fang, Y; Zhang, Z; Qiao, Y; Wang, W and Deng, Y (2023) How resilient safety culture correct unsafe behavior of new generation of construction workers: The mediating effects of job crafting and perceived work meaningfulness. Engineering, Construction and Architectural Management, 30(10), pp. 4821-4845. ISSN 0969-9988
Nobe, M C (2007) Values and construction waste recycling: An application of the cognitive hierarchy to construction management education. PhD thesis, Colorado State University, USA.
Noller, Hanna and Tarik, Ayat (2025) The importance of multi-roles and code-switching in living labs. Buildings & Cities, 6(1), pp. 952-968. ISSN 2632-6655
Nordin, A (2013) Constructing component-based systems directly from requirements using incremental composition. PhD thesis, University of Manchester, UK.
Nosheen, A (2022) Development of an effective claim management framework for the UK construction industry. PhD thesis, Coventry University, UK.
Novieto, D T (2023) Safety climate and occupational safety behaviours: The mediating role of psychological ownership among construction professionals. Engineering, Construction and Architectural Management, 30(2), pp. 853-868. ISSN 0969-9988
Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175
Nuhu, B K; Aliyu, I; Adegboye, M A; Ryu, J K; Olaniyi, O M and Lim, C G (2021) Distributed network-based structural health monitoring expert system. Building Research & Information, 49(1), pp. 144-159. ISSN 0961-3218
Nwadike, A N and Wilkinson, S (2022) Why amending building codes? An investigation of the benefits of regular building code amendment in New Zealand. International Journal of Building Pathology and Adaptation, 40(1), pp. 76-100. ISSN 23984708
Nyongesa, H O; Musumba, G W and Chileshe, N (2017) Partner selection and performance evaluation framework for a construction-related virtual enterprise: A multi-agent systems approach. Architectural Engineering and Design Management, 13(5), pp. 344-364. ISSN 1745-2007
Nyström, J (2008) A quasi-experimental evaluation of partnering. Construction Management and Economics, 26(5), pp. 531-541. ISSN 1466433X
O'Neill, T; Spillane, J P and Carmody, S (2022) The composition and classification of interpersonal conflict in Irish construction small and medium-sized enterprises: A case study. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
O'Reilly, M P and Mawdesley, M J (1994) The evaluation of construction disputes: A risk approach. Engineering, Construction and Architectural Management, 1(2), pp. 103-114. ISSN 0969-9988
Obiozo, R N (2018) The role of psychosocial recuperative therapy in enhancing construction performance on projects. PhD thesis, Nelson Mandela University, South Africa.
Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.
Odeyinka, H A (2000) An evaluation of the use of insurance in managing construction risks. Construction Management and Economics, 18(5), pp. 519-524. ISSN 01446193
Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387
Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599
Ogunsemi, D R and Aje, I O (2006) A model for contractors' selection in Nigeria. Journal of Financial Management of Property and Construction, 11(1), pp. 33-44. ISSN 1366-4387
Ogwueleka, A C and Udoudoh, F P (2018) The impact of risk and reward dynamics in incentive compensation plans in the Nigerian construction industry. International Journal of Construction Management, 18(3), pp. 247-259. ISSN 1562-3599
Ojiako, U; Mashele, T and Chipulu, M (2014) Ubuntu within the South African construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 83-90. ISSN 17514304
Ojo, A E and Akinradewo, F O (2011) Essentials in arbitration clause for construction contract dispute resolution in Nigeria. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ojo, E O (2019) Project managers’ capacity-planning practices for infrastructure projects in qatar. PhD thesis, Walden University, USA.
Okello, J F; Bowa, O and Migosi, J (2025) The role of project delivery methods on the execution of construction projects in the Kenyan judiciary. Construction Economics and Building, 25(1), pp. 49-68. ISSN 2204-9029
Okere, G O (2012) An investigative study of contract administration practices of general contractors on federal and state DOT projects. PhD thesis, Indiana State University, USA.
Okoli, J. (2020) Expert knowledge elicitation in the firefighting domain and the implications for training novices. International Journal of Disaster Resilience in the Built Environment, 11(4), pp. 577-578. ISSN 1759-5908
Okudan, O; Budayan, C and Dikmen, I (2020) Development of a conceptual life cycle performance measurement system for build-operate-transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988
Okudan, O; Budayan, C and Dikmen, I (2021) Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988
Okudan, O; Cevikbas, M and Işık, Z (2025) Selection framework of disruption analysis methods for megaprojects: An integrated fuzzy multi-criteria decision-making approach. Engineering, Construction and Architectural Management, 32(1), pp. 59-86. ISSN 0969-9988
Okudan, O and Çevikbaş, M (2022) Alternative dispute resolution selection framework to settle disputes in public-private partnership projects. Journal of Construction Engineering and Management, 148(9): 04022086, ISSN 0733-9364
Olajide, J F; Ajayi, O O; Kudirat Ibilola, Z and Adenuga, O A (2021) Climatic conditions and the resilience of buildings along Lagos coastline. Built Environment Project and Asset Management, 11(4), pp. 738-749. ISSN 2044-124X
Olanrewaju, A A L (2012) Quantitative analysis of defects in university buildings: User perspective. Built Environment Project and Asset Management, 2(2), pp. 167-181. ISSN 2044-124X
Olatunde, N A; Awodele, I A and Adebayo, B O (2022) Impact of COVID-19 pandemic on indigenous contractors in a developing economy. Journal of Engineering, Design and Technology, 20(1), pp. 267-280. ISSN 1726-0531
Olbina, S; Hinze, J and Arduengo, C (2011) Drug testing practices in the US construction industry in 2008. Construction Management and Economics, 29(10), pp. 1043-1057. ISSN 01446193
Olimat, H.; Abudayyeh, O.; Liu, H. and Alwashah, Z. (2026) Safety performance evaluation model for off-site construction through the integration of key leading and lagging factors. Journal of Construction Engineering and Management, 152(6): 04026077, ISSN 0733-9364
Olopade, J O (2020) Qualitative comparative analysis of causal pathways to successful construction cross-functional teams. PhD thesis, University of Florida, USA.
Olusola, J. and Phung, Q. (2026) A framework for adopting smart contracts in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1284-1298. ISSN 1562-3599
Omopariola, E D; Olugboyega, O; Windapo, A O and Albert, I (2022) Establishing the cost and time performances of projects executed by South African construction companies using different payment systems. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Onat, N (1998) An approach to the determination of adaptable spatial design concept in housing production by using prefabricated building elements. PhD thesis, Dokuz Eylul Universitesi, Turkey.
Onsarigo, L; Duncan, K and Atalah, A (2020) The effect of prevailing wages on building costs, bid competition, and bidder behaviour: Evidence from Ohio school construction. Construction Management and Economics, 38(10), pp. 917-933. ISSN 01446193
Opawole, A (2018) Penalty mechanisms for enforcing concessionaire performance in public-private partnership contracts in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 161-191.
Opawole, A and Jagboro, G O (2018) Compensation mechanisms for minimizing private party risks in concession-based public-private partnership contracts. International Journal of Building Pathology and Adaptation, 36(1), pp. 93-120. ISSN 23984708
Opdyke, A (2017) Resilient and sustainable infrastructure systems: A comparative analysis of post-disaster shelter coordination, stakeholder participation, and training. PhD thesis, University of Colorado at Boulder, USA.
Osei-Asibey, D; Ayarkwa, J; Acheampong, A; Adinyira, E and Amoah, P (2023) Impacts of accidents and hazards on the Ghanaian construction industry. International Journal of Construction Management, 23(4), pp. 708-717. ISSN 1562-3599
Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387
Oshin-Martin, M (2014) Managing beyond the contract: Communicating and connecting to build sustainable collaborative relationships in international public-private partnerships. DM thesis, University of Maryland University College, USA.
Osman, I A (2022) Impacts of global pandemics on construction projects and dispute resolution provisions. PhD thesis, University of Illinois at Chicago, USA.
Ospina Alvarado, A M (2011) Unified framework for construction project integration and its potential association with project performance. PhD thesis, Georgia Institute of Technology, USA.
Osuolale, M. D.; Ajisomo, T. and Felkner, J. (2026) Quantifying barriers to sustainable material adoption in emerging markets using fuzzy synthetic evaluation. Smart and Sustainable Built Environment, pp. 1-32. ISSN 2046-6099
Oswald, D (2016) Investigating unsafe acts on a large multinational construction project. PhD thesis, University of Edinburgh, UK.
Oswald, T H (1995) A model for using quality function deployment in engineering project development. PhD thesis, Clemson University, USA.
Othman, N (1997) Management of variations in construction contracts. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Otim, M A; Kyalisiima, C; Tutesigensi, A; Mutikanga, H E and Kayondo, M (2023) Avoiding disputes through effective procurement in large construction projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Otim, M A; Tutesigensi, A and Mutikanga, H E (2022) Can professionalism make contract disputes in infrastructure projects disappear? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Owusu-Manu, D G; Asiedu, R O; Edwards, D J; Donkor-Hyiaman, K; Abuntori, P A and El-Gohary, H (2019) An assessment of mortgage loan default propensity in Ghana. Journal of Engineering, Design and Technology, 17(5), pp. 985-1017. ISSN 1726-0531
Owusu-Manu, D G; Edwards, D J; Donkor-Hyiaman, K A; Asiedu, R O; Hosseini, M R and Obiri-Yeboah, E (2019) Housing attributes and relative house prices in Ghana. International Journal of Building Pathology and Adaptation, 37(5), pp. 733-746. ISSN 23984708
Owusu-Manu, D G; Ghansah, F A; Darko, A; Asiedu, R O and Edwards, D J (2020) Insurable and non-insurable risks in complex project deals: Case of the Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(6), pp. 1971-1995. ISSN 1726-0531
Owusu-Manu, D-G; John, E D; Adesi, M; Badu, E and Love, P E D (2016) Attaining fairness in construction cost consultancy pricing services: A case study in Ghana. Journal of Engineering, Design and Technology, 14(4), pp. 699-712.
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988
Ozturk, A (2010) Management of trans-boundary mega-projects in the post-cold war Eurasia: The case studies of GAP water and Baku-Ceyhan pipeline projects. PhD thesis, Keele University, UK.
Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387
Palmer, K (2012) Local authority liability in New Zealand for defective homes. International Journal of Law in the Built Environment, 4(3), pp. 203-216. ISSN 17561469
Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(5), pp. 461-475. ISSN 0969-9988
Panthi, K; Ahmed, S M and Ogunlana, S O (2009) Contingency estimation for construction projects through risk analysis. International Journal of Construction Education and Research, 5(2), pp. 79-94. ISSN 1557-8771
Parisi, Fabio (2023) Automation and information approaches to support maintenance and production management in the construction industry. PhD thesis, Politecnico di Bari, Italy.
Park, S-B (2003) Study of multicriteria decision-making: Development of a decision model to determine when to conduct nighttime construction road work. PhD thesis, Oregon State University, USA.
Parry, A (2015) The improvement of delay analysis in the UK construction industry. PhD thesis, Northumbria University, UK.
Pasiphol, S (1994) New concepts for total float distribution in CPM project scheduling. PhD thesis, University of Texas at Austin, USA.
Pasquire, C; Ballard, G; Darrington, J W and Howell, G A (2011) Motivation and incentives in relational contracts. Journal of Financial Management of Property and Construction, 16(1), pp. 42-51. ISSN 1366-4387
Patel, D A; Kikani, K D and Jha, K N (2016) Hazard assessment using consistent fuzzy preference relations approach. Journal of Construction Engineering and Management, 142(12): 04016067, ISSN 0733-9364
Patel, M; Sherratt, F and Farrell, P (2012) Exploring human error through the safety talk of utilities distribution operatives. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531
Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.
Patterson, R (2009) Using NEC contracts to manage risk and avoid disputes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 157-167. ISSN 17514312
Paulson, B C and Fondahl, J W (1983) Craft jurisdiction impact on construction. Journal of Construction Engineering and Management, 109(4), pp. 369-386. ISSN 0733-9364
Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364
Paz, J C; Rozenboim, D; Cuadros, Á; Cano, S and Escobar, J W (2018) A simulation-based scheduling methodology for construction projects considering the potential impacts of delay risks. Construction Economics and Building, 18(2), pp. 41-69. ISSN 2204-9029
Peh, L C (2010) Relationship between flight-time and organization design of internationalizing architectural and engineering (a&e) consultancy firms. PhD thesis, National University of Singapore, Singapore.
Perera, B A K S; Ekanayake, B J; Jayalath, C and Jayathilaka, G R H (2021) A study on variation-specific disputes that arise in road projects in Sri Lanka: A qualitative approach. International Journal of Construction Management, 21(6), pp. 571-581. ISSN 1562-3599
Perera, B A K S; Sirimewan, D C and Senadeera, A D (2021) Management of variations in the public-sector building construction projects in Sri Lanka. Journal of Engineering, Design and Technology, 19(6), pp. 1601-1619. ISSN 1726-0531
Perera, U S; Siriwardana, C and Pitigala Liyana Arachchi, I S (2024) Development of critical infrastructure resilience index for cities in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 193-211. ISSN 1759-5916
Perng, Y-H (1988) An intelligent system approach for construction risk identification. PhD thesis, University of Texas at Austin, USA.
Perry, L J (2006) Industrial disputes in the construction sector. Construction Economics and Building, 6(1), pp. 42-50. ISSN 2204-9029
Pham, S V H and Nguyen, K V T (2025) Performance review of RTI IMS software for automatic road surface damages identification. International Journal of Construction Management, 25(4), pp. 439-455. ISSN 1562-3599
Pham, V H S and Phan, K A (2023) Elaboration of willingness to pay and compensation demanded for costly bid preparation. International Journal of Construction Management, 23(7), pp. 1131-1137. ISSN 1562-3599
Phillips, H C (2009) A proposed method to determine confidence in a construction schedule. PhD thesis, University of New Mexico, USA.
Phillips-Alonge, O K (2017) The influence of partnering on the occurrence and cost of construction conflicts and disputes. PhD thesis, Northcentral University, USA.
Phillips-Alonge, O K (2019) The influence of partnering on the occurrence of construction requirement conflicts and disputes. International Journal of Construction Management, 19(4), pp. 291-306. ISSN 1562-3599
Phung, Q; Erdogan, B and Nielsen, Y (2023) Project management for sustainable buildings: A comprehensive insight into the relationship to project success. Engineering, Construction and Architectural Management, 30(7), pp. 2862-2878. ISSN 0969-9988
Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods. PhD thesis, Iowa State University, USA.
Plumblee II, J M (2013) Incorporating natural hazard resistance into the life cycle assessment framework. PhD thesis, Clemson University, USA.
Polat, G and Bingol, B N (2013) A comparison of fuzzy logic and multiple regression analysis models in determining contingency in international construction projects. Construction Innovation, 13(4), pp. 445-462. ISSN 1471-4175
Potts, K F (1988) An alternative payment system for major 'fast track' construction projects. Construction Management and Economics, 6(1), pp. 25-33. ISSN 01446193
Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988
Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.
Pratt, N (2015) The "by right" defence in village green registration. International Journal of Law in the Built Environment, 7(2), pp. 96-110. ISSN 1756-1450
Praveen, D and Kunnampalli, J (2024) Evaluating the impacts of anticipated sea level rise, climate change and land use land cover scenarios on the rice crop in Alappuzha, Kerala and strategies to build climate responsive agriculture. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 755-775. ISSN 1759-5916
Price, A D F and Lu, J (2013) Impact of hospital space standardization on patient health and safety. Architectural Engineering and Design Management, 9(1), pp. 49-61. ISSN 1745-2007
Prieto, A J and Alarcón, L F (2023) Using fuzzy inference systems for lean management strategies in construction project delivery. Journal of Construction Engineering and Management, 149(9): 04023083, ISSN 0733-9364
Prinsloo, H F (2016) Toward a decision framework for the analysis of construction claims. PhD thesis, University of Pretoria, South Africa.
Prolas, L A M (2019) In search of efficiency: an analysis of adjudication under the Ontario Construction Act. JD thesis, Queen's University Belfast, UK.
Pulket, T (2008) Universal prediction model for construction litigation. PhD thesis, Illinois Institute of Technology, USA.
Pulket, T and Arditi, D (2009) Construction litigation prediction system using ant colony optimization. Construction Management and Economics, 27(3), pp. 241-251. ISSN 1466433X
Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099
Qadir, N; Brooks, T and Quigg, E (2023) Potential for construction statutory adjudication in Pakistan: taking lessons from the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 91-102. ISSN 17514304
Qc, A N (2007) Expert evidence: Problems and safeguards. Construction Management and Economics, 25(7), pp. 785-790. ISSN 1466433X
Qi, L; Zhai, H and Shuang, Q (2026) Attention-driven multiobject tracking for proactive fall safety management in construction. Journal of Construction Engineering and Management, 152(5): 04026052, ISSN 0733-9364
Qian, Q K; Fan, K and Chan, E H W (2016) Regulatory incentives for green buildings: Gross floor area concessions. Building Research & Information, 44(5-6), pp. 675-693. ISSN 0961-3218
Qiu, W; Ma, P; Peng, Q; Zhao, L; Liu, L and Zhou, F (2024) An evaluation method for multisource information fusion in tunneling water inrush disasters. Journal of Construction Engineering and Management, 150(10): 04024133, ISSN 0733-9364
Quaigrain, R A; Winter, J and Issa, M H (2014) A critical review of the literature on disability management in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Quanjel, E M C J (2013) Collaborative design support: workshops to stimulate interaction and knowledge exchange between practitioners. PhD thesis, Eindhoven University of Technology, Netherlands.
Ragab, M A and Marzouk, M (2021) BIM adoption in construction contracts: Content analysis approach. Journal of Construction Engineering and Management, 147(8): 0002123, ISSN 0733-9364
Rahat, R; Pradhananga, P and ElZomor, M (2024) Evaluation of safe-to-fail flood solution alternatives and integration of safe-to-fail concept in AEC education to develop resilient coastal cities. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 244-258. ISSN 1759-5916
Rahman, M M and Kumaraswamy, M M (2001) Appraising the potential for joint risk management. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988
Rai, H; Jagannathan, M and Venkata Santosh Kumar, D (2021) Claim tenability assessment in Indian real estate projects using ann and decision tree models. Built Environment Project and Asset Management, 11(3), pp. 468-487. ISSN 2044-124X
Raj, S; Hillig, J B and Hughes, W P (2009) Responsiveness to change by standard-form contract drafters in the construction industry: A case study of the FIDIC white book. International Journal of Law in the Built Environment, 1(3), pp. 205-220. ISSN 1756-1450
Rajak, S. and Vimal, K. E. K. (2026) Blockchain-based time impact analysis method for sustainable delay management in EPC projects. Journal of Construction Engineering and Management, 152(6): 04026074, ISSN 0733-9364
Raliile, M.; Haupt, T. C. and Kajimo-Shakantu, K. (2026) The mediating and moderating role of coping on occupational stress and psychological well-being among the construction workforce in South Africa: The psychological stress theory approach. Journal of Engineering, Design and Technology, 24(2), pp. 427-447. ISSN 1726-0531
Ramachandra, T (2013) Exploring feasible solutions to payment problems in the construction industry in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Ramachandra, T and Rotimi, J O (2011) The nature of payment problems in the New Zealand construction industry. Construction Economics and Building, 11(2), pp. 22-33. ISSN 2204-9029
Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ramachandra, T and Rotimi, J O B (2015) Causes of payment problems in the New Zealand construction industry. Construction Economics and Building, 15(1), pp. 43-55. ISSN 2204-9029
Rameezdeen, R; Gunarathna, N and Assistant, R (2003) Organisational culture in construction: An employee perspective. Construction Economics and Building, 3(1), pp. 19-30. ISSN 2204-9029
Rameezdeen, R and Rodrigo, A (2013) Textual complexity of standard conditions used in the construction industry. Construction Economics and Building, 13(1), pp. 1-12. ISSN 2204-9029
Rameezdeen, R and Rodrigo, A (2014) Modifications to standard forms of contract: The impact on readability. Construction Economics and Building, 14(2), pp. 31-40. ISSN 2204-9029
Ramzanpour, M; Sharghi, A; Nourtaghani, A and Saleh Sedghpour, B (2023) The reduction of low-income housing stigma with facade features; low- and medium-sized cities. Architectural Engineering and Design Management, 19(3), pp. 250-266. ISSN 1745-2007
Ranasinghe, A (2012) Construction arbitration in Sri Lanka. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 91-94. ISSN 17514312
Randolph Thomas, H; Smith, G R and Cummings, D J (1995) Enforcement of liquidated damages. Journal of Construction Engineering and Management, 121(4), pp. 459-463. ISSN 0733-9364
Randolph Thomas, H; Smith, G R and Cummings, D J (1995) Have I reached substantial completion? Journal of Construction Engineering and Management, 121(1), pp. 121-129. ISSN 0733-9364
Randolph Thomas, H; Smith, G R and Wirsching, S M (1995) Understanding defective specifications. Journal of Construction Engineering and Management, 121(1), pp. 55-65. ISSN 0733-9364
Rastogi, A and Kumar Singla, H K (2025) Exhausted employees do not leave, disengaged employees do: A case of the Indian construction industry. Construction Economics and Building, 25(3-4), pp. 143-162. ISSN 2204-9029
Rathnayake, B; Gunathilake, L; Edirisinghe, R and Perera, S (2025) Ecoconstruct: A blockchain-based system for carbon trading in construction projects. Construction Innovation, 25(7), pp. 213-234. ISSN 1471-4175
Rees, J V (1986) Reforming the workplace: A study of self-regulation in occupational safety. PhD thesis, University of California, Berkeley, USA.
Reinschmidt, K F; Griffis, F H and Bronner, P L (1991) Integration of engineering, design, and construction. Journal of Construction Engineering and Management, 117(4), pp. 756-772. ISSN 0733-9364
Ren, Z (2002) A multi-agent systems approach to construction claims negotiation. PhD thesis, Loughborough University, UK.
Ren, Z; Anumba, C J and Ugwu, O (2000) Towards a multi-agent system for construction claims negotiation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Ren, Z; Anumba, G J and Ugwu, O O (2001) Construction claims management: Towards an agent-based approach. Engineering, Construction and Architectural Management, 8(3), pp. 185-197. ISSN 0969-9988
Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099
Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration. PhD thesis, Illinois Institute of Technology, USA.
Riad, N I; Arditi, D and Mohammadi, J (1994) Integrated system for managing owner-directed project acceleration. Journal of Construction Engineering and Management, 120(1), pp. 77-95. ISSN 0733-9364
Rilett, L R (1998) Effect of variability on end product specifications. Journal of Construction Engineering and Management, 124(2), pp. 139-145. ISSN 0733-9364
Robertson, C M (2018) Migrant worker perceptions of life, work, health and safety in Kuwait: A construction industry perspective. PhD thesis, Auckland University of Technology, New Zealand.
Rodrigo, Thanuja K (2012) Mitigating the risk of unfair demands under on-demand guarantees in the export and construction industries in Sri Lanka: A proposal for legal and structural reform. PhD thesis, Griffith University, Sri Lanka.
Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988
Rooney P, A R (2013) A case study of changing procurement practices on delivery of highways projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Roshani, D (2005) Integrated collaborative building design using internet technology. PhD thesis, University of Nottingham, UK.
Rostami, A; Sommerville, J; Wong, I L and Lee, C (2014) Using appropriate tools and techniques for risk identification in UK construction's SMEs. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Rostamnezhad, M; Nasirzadeh, F; Khanzadi, M; Jarban, M J and Ghayoumian, M (2020) Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: A case study of highway project. Engineering, Construction and Architectural Management, 27(7), pp. 1595-1618. ISSN 0969-9988
Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.
Roupé, M (2013) Development and implementations of virtual reality for decision-making in urban planning and building design. PhD thesis, Chalmers University of Technology, Sweden.
Royal, S; Lehoux, N and Blanchet, P (2022) New home warranty schemes: Developing a theoretical comparative framework using qualitative content analysis. International Journal of Building Pathology and Adaptation, 40(4), pp. 499-522. ISSN 23984708
Ruff, C M; Dzombak, D A and Hendrickson, C T (1996) Owner-contractor relationships on contaminated site remediation projects. Journal of Construction Engineering and Management, 122(4), pp. 348-353. ISSN 0733-9364
Russell, A D; Tran, N and Staub-French, S (2014) Searching for value: Construction strategy exploration and linear planning. Construction Management and Economics, 32(6), pp. 520-547. ISSN 01446193
Russell, J S (1988) A knowledge-based system approach to the contractor prequalification process. PhD thesis, Purdue University, USA.
Russell, J S and Jaselskis, E J (1992) Predicting construction contractor failure prior to contract award. Journal of Construction Engineering and Management, 118(4), pp. 791-811. ISSN 0733-9364
Russell, J S and Jaselskis, E J (1992) Quantitative study of contractor evaluation programs and their impact. Journal of Construction Engineering and Management, 118(3), pp. 612-624. ISSN 0733-9364
Rutter, D and Potter, B (2003) The role of multi-criterion decision methods (MCDM) in securing best value from buildings procured through PPP/PFI. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Rwelamila, P D; Talukhaba, A A and Ngowi, A B (1999) Tracing the African project failure syndrome: The significance of 'ubuntu'. Engineering, Construction and Architectural Management, 6(4), pp. 335-346. ISSN 0969-9988
Ryan, C.; Spillane, J. P. and Bradley, J. G. (2025) The jurisdiction of adjudicators under the construction contracts act 2013: A case review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 7-15. ISSN 1751-4304
Ryan, C; Spillane, J P and Bradley, J G (2023) Legal issues facing adjudication in the Irish construction industry: A discussion. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Ryan, C; Spillane, J P and Bradley, J G (2024) Barriers to the adoption of alternative dispute resolution within the Irish construction industry: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Ryan, E C (2001) An economic analysis of the standard construction contract. PhD thesis, King's College London, UK.
Sabitu Oyegoke, A (2001) UK and US construction management contracting procedures and practices: A comparative study. Engineering, Construction and Architectural Management, 8(5-6), pp. 403-417. ISSN 0969-9988
Sadeghi, M; Mahmoudi, A and Deng, X (2023) Blockchain technology in construction organizations: Risk assessment using trapezoidal fuzzy ordinal priority approach. Engineering, Construction and Architectural Management, 30(7), pp. 2767-2793. ISSN 0969-9988
Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.
Saeb, A; Danuri, M S M; Mohamed, O and Zakaria, N (2021) A mechanism for dispute resolution in the Iranian construction industry. Journal of Construction in Developing Countries, 26(1), pp. 205-226. ISSN 1823-6499
Saeb, A; Mohd Danuri, M S B; Zakaria, N B and Mohamed, O B (2020) A case study of dispute resolution methods pertaining to the construction standard form in Iran. International Journal of Construction Education and Research, 16(3), pp. 211-230. ISSN 1557-8771
Saka, N and Mudi, A (2007) Practices and challenges of supply chain management by building contracting firms in the Lagos metropolitan area. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Salamah, A A A (1989) COAD: A knowledge-based expert system for conceptual estimates and designs. PhD thesis, University of Colorado at Boulder, USA.
Salami, B A; Ajayi, S O and Oyegoke, A S (2023) Tackling the impacts of covid-19 on construction projects: An exploration of contractual dispute avoidance measures adopted by construction firms. International Journal of Construction Management, 23(7), pp. 1196-1204. ISSN 1562-3599
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Salvatierra-Garrido, J (2012) Conceptualising value for construction: experience from social housing projects in Chile. PhD thesis, Loughborough University, UK.
Samarasinghe, D A S (2014) Building materials supply chains: An evaluative study of the New Zealand residential construction. PhD thesis, Auckland University of Technology, New Zealand.
Sandberg, R; Räisänen, C; Löwstedt, M and Raidén, A B (2016) Exploring the work practices of site managers as processes of embodiment. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Sang, L; Yu, M; Lin, H; Zhang, Z and Jin, R (2021) Big data, technology capability and construction project quality: A cross-level investigation. Engineering, Construction and Architectural Management, 28(3), pp. 706-727. ISSN 0969-9988
Sangiorgio, V; Uva, G and Fatiguso, F (2018) Optimized AHP to overcome limits in weight calculation: Building performance application. Journal of Construction Engineering and Management, 144(2): 04017101, ISSN 0733-9364
Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599
Sargent, A C (2018) Building modern India: Transformations of labor in the Indian construction industry. PhD thesis, University of Chicago, USA.
Schmidt, J R (1997) Quantifying the impact of construction accidents using predictive models. PhD thesis, State University of New York at Buffalo, USA.
Schofield, K E (2012) Risk factors for injuries in small and medium sized construction companies. PhD thesis, University of Minnesota, USA.
Schubert, F N (1991) U.S. Army corps of engineers and Afghanistan's highways 1960–1967. Journal of Construction Engineering and Management, 117(3), pp. 445-459. ISSN 0733-9364
Schwatka, N V (2014) Managing through measurement: Occupational health and safety in the construction industry. PhD thesis, Colorado State University, USA.
Scott, S and Harris, R A (2004) United Kingdom construction claims: Views of professionals. Journal of Construction Engineering and Management, 130(5), pp. 734-741. ISSN 0733-9364
Scovell, M; McShane, C and Swinbourne, A (2021) Experience and the perceived efficacy of cyclone preparedness behaviour. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 170-183. ISSN 1759-5916
Sehic, A (2014) Decision support tool for interface management. PhD thesis, Polytechnic Institute of New York University, USA.
Semple, C; Hartman, F T and Jergeas, G (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), pp. 785-795. ISSN 0733-9364
Senaratne, S and Mayuran, J (2015) Documentation management based on ISO for construction industries in developing countries. Journal of Construction in Developing Countries, 20(2), pp. 81-95. ISSN 1823-6499
Seneviratne, K and Michael, G V (2020) Disputes in time bar provisions for contractors' claims in standard form of contracts. International Journal of Construction Management, 20(4), pp. 335-346. ISSN 1562-3599
Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(2),
Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.
Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.
Serraino, P (2024) Teamwork and collaboration: Case studies in architectural practice. PhD thesis, University of California, Berkeley, USA.
Sertyeşilışık, B (2007) An investigation on the application of standard contracts in the Turkish construction industry. PhD thesis, Middle East Technical University, Turkey.
Sfakianakis, E and van de Laar, M (2013) Fiscal effects and public risk in public-private partnerships. Built Environment Project and Asset Management, 3(2), pp. 181-198. ISSN 2044-124X
Shafabakhsh, G A; Kashi, E and Akbari, A (2016) A comparison effect of aircraft main gear configuration on runway damages by led and fe method. Journal of Engineering, Design and Technology, 14(2), pp. 362-372.
Shafei, H; Rahman, R A; Lee, Y S and Che Ibrahim, C K I (2025) Implications of construction 4.0 technologies to enhancing well-being: A fuzzy TOPSIS evaluation. Construction Innovation, 25(1), pp. 131-165. ISSN 1471-4175
Shafique, F and Mollaoglu, S (2022) Shared transformational leadership for green architecture engineering and construction project teams: A study of LEED projects. Journal of Construction Engineering and Management, 148(12): 04022137, ISSN 0733-9364
Shahhosseini, V; Afshar, M R and Amiri, O (2018) Value engineering practices in infrastructure projects: A case study of Ilam gas refinery's water transmission system at Reno Mountain, Iran. International Journal of Construction Management, 18(5), pp. 351-363. ISSN 1562-3599
Shahhosseini, V and Hajarolasvadi, H (2021) A conceptual framework for developing a BIM-enabled claim management system. International Journal of Construction Management, 21(2), pp. 208-222. ISSN 1562-3599
Shahsavand, P; Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(4), pp. 497-533. ISSN 0969-9988
Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms. PhD thesis, University of Washington, USA.
Shang, L and Abdel Aziz, A M (2020) Stackelberg game theory-based optimization model for design of payment mechanism in performance-based PPPs. Journal of Construction Engineering and Management, 146(4): 04020029, ISSN 0733-9364
Shapira, A; Simcha, M and Goldenberg, M (2012) Integrative model for quantitative evaluation of safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 138(11), pp. 1281-1293. ISSN 0733-9364
Sharafi, A; Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(2), pp. 87-103. ISSN 01446193
Sharafi, A; Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of financial conflicts in the operation phase of public-private partnership contracts. Journal of Construction Engineering and Management, 147(6): 78622011, ISSN 0733-9364
Shaurette, M (2015) Higher hourly cost compensation for heavy equipment used in demolition activity. International Journal of Construction Education and Research, 11(4), pp. 280-291. ISSN 1557-8771
She, Ling-Ye (2014) Understanding the conditions of trust between governance and management within project alliancing. PhD thesis, University of Melbourne, Australia.
Shealy, T and Klotz, L (2015) Well-endowed rating systems: How modified defaults can lead to more sustainable performance. Journal of Construction Engineering and Management, 141(10): 04015031, ISSN 0733-9364
Shehab, T and Noureddine, A (2014) Prioritization model for rehabilitation of public school buildings in California. International Journal of Construction Education and Research, 10(1), pp. 58-75. ISSN 1557-8771
Shehadeh, A; Alshboul, O and Tamimi, M (2025) Quantitative analysis of climate-adaptive pavement technologies: Mitigating environmental impact and enhancing economic viability in urban infrastructure. Journal of Construction Engineering and Management, 151(6): 04025064, ISSN 0733-9364
Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X
Shen, Z and Wu, J (2025) Multiobjective ant colony system algorithm for component-level construction schedule optimization. Journal of Construction Engineering and Management, 151(3): 04025002, ISSN 0733-9364
Sherif, E h and Kaka, A (2004) A multi criteria mode for the selection of the payments systems in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Shi, J J (1999) A neural network based system for predicting earthmoving production. Construction Management and Economics, 17(4), pp. 463-471. ISSN 01446193
Shiers, D; Lavers, A and Keeping, M (2007) Indicators of the impact of environmental factors on UK construction law: Developments in the new millennium. Construction Management and Economics, 25(7), pp. 821-829. ISSN 1466433X
Shikweni, S (2018) Talent management in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Shin, K-C (2000) Identification of critical dispute characteristics (CDCs) during construction project operations. PhD thesis, Georgia Institute of Technology, USA.
Shrestha, R B and Ogunlan, S (2006) Comparative study of power purchase agreements in the Nepalese environment. Journal of Financial Management of Property and Construction, 11(3), pp. 133-148. ISSN 1366-4387
Shugart, C T (1998) Regulation-by-contract and municipal services: The problem of contractual incompleteness. PhD thesis, Harvard University, USA.
Shurrab, M; Abbasi, G and Al Khazaleh, R (2018) Evaluating the effect of motivational dimensions on the construction project managers in Jordan. Engineering, Construction and Architectural Management, 25(3), pp. 412-424. ISSN 0969-9988
Si, J (2017) Green retrofit of existing non-domestic buildings as a multi criteria decision making process. PhD thesis, University College London, UK.
Siddiquei, A N; Imam, H and Asmi, F (2024) How and when temporal leadership facilitates the success of sustainable construction projects. Engineering, Construction and Architectural Management, 31(12), pp. 4852-4871. ISSN 0969-9988
Sidoli, J S (2021) Disputing in the built environment. PhD thesis, Open University, UK.
Sidoli Del Ceno, J (2011) An investigation into lawyer attitudes towards the use of mediation in commercial property disputes in England and Wales. International Journal of Law in the Built Environment, 3(2), pp. 182-198. ISSN 1756-1450
Sidoli del Ceno, J (2012) A process account of construction mediation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Sidoli del Ceno, J (2014) Compulsory mediation: Civil justice, human rights and proportionality. International Journal of Law in the Built Environment, 6(3), pp. 286-299. ISSN 1756-1450
Sidoli del Ceno, J; George, H and Vols, M (2015) Adjudication in tenancy deposit scheme disputes: Agents' perspectives. International Journal of Law in the Built Environment, 7(2), pp. 162-172. ISSN 1756-1450
Sidwell, A C; Budiawan, D and ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(2), pp. 107-116. ISSN 1471-4175
Silva, P M; Domingo, N and Ameer Ali, N A N (2024) Causes of disputes in the construction industry: a systematic literature review. Journal of Financial Management of Property and Construction, 29(2), pp. 193-210. ISSN 1366-4387
Silva, P M; Domingo, N and Ameer Ali, N A N (2025) An interactive pre-contract dispute avoidance toolkit for New Zealand construction industry. Construction Innovation, 25(7), pp. 268-291. ISSN 1471-4175
Silva, P M; Domingo, N and Ali, N A N A (2025) Pre-contract measures to avoid potential disputes in the New Zealand construction industry. Construction Economics and Building, 25(2), pp. 235-252. ISSN 2204-9029
Silveira da Costa, V and da Silva Torres, A (2023) Diagnosis of degradation state of the historic building facade through qualitative and quantitative indicators: Case study of the former school of agronomy eliseu maciel. International Journal of Building Pathology and Adaptation, 41(4), pp. 734-766. ISSN 23984708
Sinclair, S (2016) Designing + (dis)assembling disputes: an ethnography of disputes & lawyers in the construction industry. PhD thesis, University of Westminster, UK.
Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.
Sinesilassie, E G; Tripathi, K K; Tabish, S Z S and Jha, K N (2019) Modeling success factors for public construction projects with the SEM approach: Engineer's perspective. Engineering, Construction and Architectural Management, 26(10), pp. 2410-2431. ISSN 0969-9988
Singh, A (2003) Accelerated work-schedule design considering efficiency losses for overtime and overmanning. Engineering, Construction and Architectural Management, 10(5), pp. 312-321. ISSN 0969-9988
Singh, D and Tiong, R L K (2005) A fuzzy decision framework for contractor selection. Journal of Construction Engineering and Management, 131(1), pp. 62-70. ISSN 0733-9364
Singla, H K and Samanta, P K (2022) Identification of critical success factors (CSFs) for real estate developers (reds) in India. Journal of Financial Management of Property and Construction, 27(1), pp. 76-90. ISSN 1366-4387
Skaik, S (2017) Operational problems and solutions of statutory complex adjudication: Stakeholders' perspectives. International Journal of Law in the Built Environment, 9(2), pp. 162-175. ISSN 1756-1450
Skaik, S; Coggins, J and Mills, A (2015) A proposed roadmap to optimise the adjudication of complex payment disputes in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Skaik, S; Coggins, J and Mills, A (2015) Investigating the factors influencing the quality of adjudication of complex payment disputes in Australia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Skaik, Samer Hisham (2017) Introducing review mechanisms into statutory construction adjudication. PhD thesis, Deakin University, Australia.
Skibniewski, M J and Chao, L C (1992) Evaluation of advanced construction technology with AHP method. Journal of Construction Engineering and Management, 118(3), pp. 577-593. ISSN 0733-9364
Skitmore, M and Ng, S T (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460. ISSN 0733-9364
Smallwood, J (2005) The role of optimum health and safety (H&S) in construction marketing. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Smallwood, J J (2002) Best practice workers' compensation insurance performance: The related issues. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Smallwood, J J (2002) The influence of health and safety (H&S) culture on H&S performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Smallwood, J J and Emuze, F (2016) Factors that promote zero fatalities, injuries, and disease in construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Smith, D (2020) Rank and file union organising and employers' counter-mobilisation: The role of activists in the mobilisation of 'self-employed' construction workers. PhD thesis, University of the West of England, Bristol, UK.
Smith, J; Edwards, D J; Martek, I; Chileshe, N; Hayhow, S and Roberts, C J (2023) The antecedents of construction project change: An analysis of design and build procurement application. Journal of Engineering, Design and Technology, 21(3), pp. 655-689. ISSN 1726-0531
Soares, R (1999) User cost customization for a Florida bridge management system. PhD thesis, University of Florida, USA.
Sodeinde, O R (2024) Building damage assessment using remote sensing data and deep learning algorithms. PhD thesis, Tufts University, USA.
Sohoni, P; Ghaffar, A and Jha, K N (2017) Cost optimisation for high-rise buildings considering number of levels of shores and reshores. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Sohrabi, M (2025) Statistical methods for enhanced coastal flood risk assessment and adaptation planning. PhD thesis, University of Alabama, USA.
Soleimani, N (2022) Earthquake risk to civil infrastructure systems. PhD thesis, University of Delaware, USA.
Soltani, Z (2018) Investigating the persuasiveness of forensic information models for jurors in construction disputes. PhD thesis, Texas A&M University, USA.
Sommerville, J; Craig, N and McCarney, M (2004) Knowledge management as a stress mediator. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Song, D; Song, J; Yuan, H and Fan, Y (2021) An evolutionary game analysis of user-pay public-private partnership projects. Engineering, Construction and Architectural Management, 28(7), pp. 2042-2062. ISSN 0969-9988
Song, R; Gao, X; Nan, H; Zeng, S and Tam, V W Y (2024) Ecological restoration for mega-infrastructure projects: a study based on multi-source heterogeneous data. Engineering, Construction and Architectural Management, 31(9), pp. 3653-3678. ISSN 0969-9988
Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes. PhD thesis, Columbia University, USA.
Song, X; Peña-Mora, F; Menassa, C C and Arboleda, C A (2012) Insurance as a risk management tool for ADR implementation in construction disputes. Journal of Construction Engineering and Management, 138(1), pp. 14-21. ISSN 0733-9364
Sousa, V; Almeida, N M and Dias, L A (2014) Role of statistics and engineering judgment in developing optimized time-cost relationship models. Journal of Construction Engineering and Management, 140(8): 04014034, ISSN 0733-9364
Spillane, J P; Flood, M; Lukumon, O O; von Meding, J K and Konanahalli, A (2013) Urban high-density construction sites and their surrounding community: Issues encountered and strategies adopted by contractors. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Standinger, M L (2000) The evaluation of time claims in construction projects. PhD thesis, Loughborough University, UK.
Stanton, W A and Willenbrock, J H (1990) Conceptual framework for computer-based construction safety control. Journal of Construction Engineering and Management, 116(3), pp. 383-398. ISSN 0733-9364
Starzyk, G F (2014) Alliance contracting: Enforceability of the consensusdocs 300 mutual waiver of liability in us courts. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Steadman, P (2006) Allometry and built form: Revisiting Ranko Bon's work with the harvard philomorphs. Construction Management and Economics, 24(7), pp. 755-765. ISSN 1466433X
Steenhausen, P D (2003) Negotiating among mediators: Multiparty mediation in international politics. PhD thesis, University of Southern California, USA.
Stickley, A; Christensen, S; Duncan, W D and Buchbach, J (2016) Predictive technology and natural hazards: Risk for Australian planning authorities? International Journal of Law in the Built Environment, 8(1), pp. 42-55. ISSN 1756-1450
Stipanowich, T J (1997) At the cutting edge: Conflict avoidance and resolution in the US construction industry. Construction Management and Economics, 15(6), pp. 505-512. ISSN 01446193
Stover, B D (2004) Validation and evaluation of a disability measure for upper extremity musculoskeletal disorder screening in the workplace and prognostic factors of long-term disability. PhD thesis, University of Washington, USA.
Strahorn, S; Gajendran, T and Brewer, G (2014) Experiences of trust in construction project management: The influence of procurement mechanisms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Sturts Dossick, C and Schunk, T K (2007) Subcontractor schedule control method. Journal of Construction Engineering and Management, 133(3), pp. 262-265. ISSN 0733-9364
Styhre, A (2008) The role of social capital in knowledge sharing: The case of a specialist rock construction company. Construction Management and Economics, 26(9), pp. 941-951. ISSN 1466433X
Styhre, A; Brorström, S and Gluch, P (2022) The valuation of housing in low-amenity and low purchasing power city districts: Social and economic value entangled by default. Construction Management and Economics, 40(1), pp. 72-86. ISSN 01446193
Suazo, G A R and Jaselskis, E J (1993) Comparison of construction safety codes in United States and Honduras. Journal of Construction Engineering and Management, 119(3), pp. 560-572. ISSN 0733-9364
Subramanyan, H; Sawant, P H and Bhatt, V (2012) Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India. Journal of Construction Engineering and Management, 138(3), pp. 409-421. ISSN 0733-9364
Sultan, Mohamed (2025) PPP contracts for healthcare facilities in Canada: Qualitative study to identify lessons learned. PhD thesis, Arizona State University, USA.
Sun, N.; Wang, J. and Liao, P. C. (2026) EEG-based neural mechanisms of confidence and metacognition in construction safety hazard recognition. Journal of Construction Engineering and Management, 152(8): 04026127, ISSN 0733-9364
Sun, R; Yan, Q; Zhang, C; Qiao, M and Ren, J (2025) Comprehensive evaluation of grouting effectiveness combining qualitative on-site tests and improved fuzzy integration with entropy weight method: Case study of a mountain tunnel. Journal of Construction Engineering and Management, 151(4): 04025020, ISSN 0733-9364
Sun, X (2016) Proposed improvements to the MCAA method for quantifying construction loss of productivity. PhD thesis, University of California, Berkeley, USA.
Sundararajan, S K and Tseng, C L (2017) Managing project performance risks under uncertainty: Using a dynamic capital structure approach in infrastructure project financing. Journal of Construction Engineering and Management, 143(8): 04017046, ISSN 0733-9364
Sunindijo, Riza (2012) Skills for developing safety climate in construction projects. PhD thesis, University of New South Wales, Australia.
Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.
Sutrisna, M and Potts, K (2002) Analysing typical factors for the early prediction of variations. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Sutrisna, M; Potts, K and Proverbs, D (2004) Quotation mechanism for pre-pricing variations in civil engineering projects: A quest for best practice. Journal of Financial Management of Property and Construction, 9(1), pp. 13-26. ISSN 1366-4387
Swei, O (2018) Long-run construction cost trends: Baumol's cost disease and a disaggregate look at building material price dynamics. Journal of Construction Engineering and Management, 144(7): 04018058, ISSN 0733-9364
Sweis, R K (1988) Construction insurance in the Arab Gulf area: an analysis of cover and contracts. PhD thesis, City, University of London, UK.
Tabassi, A A; Ramli, M; Roufechaei, K M and Tabasi, A A (2014) Team development and performance in construction design teams: An assessment of a hierarchical model with mediating effect of compensation. Construction Management and Economics, 32(9), pp. 932-949. ISSN 01446193
Tabish, S Z S (2011) Critical success factors and fair performance in public construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Tabish, S Z S and Jha, K N (2018) Beyond the iron triangle in public construction projects. Journal of Construction Engineering and Management, 144(8): 04018067, ISSN 0733-9364
Taghizadeh, K; Alizadeh, M and Yavari Roushan, T (2021) Cooperative game theory solution to design liability assignment issues in BIM projects. Journal of Construction Engineering and Management, 147(9): 04021103, ISSN 0733-9364
Taher, N A b A (2009) Understanding and preventing construction conflict, claims and disputes: a critical in-depth study into their causes and recommendations to control in the United Arab Emirates. PhD thesis, University of South Wales, UK.
Taibi, Y; Chadli, M and Ziane, M (2023) Examining the potential of damage in threat zones around LPG storage sphere in hassi r'mel city, Algeria. International Journal of Disaster Resilience in the Built Environment, 14(3), pp. 301-313. ISSN 1759-5916
Taillandier, F; Sauce, G and Bonetto, R (2011) Method and tools for building maintenance plan arbitration. Engineering, Construction and Architectural Management, 18(4), pp. 343-362. ISSN 0969-9988
Taiwo, D O (2022) Incremental development of a legal framework for arbitration in emerging markets: A case study of construction arbitration in Nigeria. PhD thesis, University of Essex, UK.
Tajaddini, A; Paydar, A; Abbasianjahromi, H and Azami, Z (2023) Analysis of the damage indexes of construction projects using a hybrid fuzzy method. International Journal of Construction Management, 23(10), pp. 1694-1703. ISSN 1562-3599
Tajul Ariffin H L and Sutrisna, M (2010) Developing a framework to minimize the occurrence of construction conflict and disputes in different procurement strategies: An initial review of literature. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Talaq, J (2004) Antecedents and consequences of motivation: an examination of motivation as mediator to human and organisational performance. PhD thesis, University of Wolverhampton, UK.
Talari, N. and Tawalare, A. (2026) Unveiling the impact of current HR strategies on employee attraction, retention, and productivity in the Indian construction industry: Emerging challenges. Engineering, Construction and Architectural Management, ISSN 0969-9988
Tam, C M; Tong, T K L and Lau, C T (2003) ELECTRE III in evaluating performance of construction plants: Case study on concrete vibrators. Construction Innovation, 3(1), pp. 45-61. ISSN 1471-4175
Tam, C M; Tong, T K L; Lau, T C T and Chan, K K (2005) Selection of vertical formwork system by probabilistic neural networks models. Construction Management and Economics, 23(3), pp. 245-254. ISSN 01446193
Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364
Tam, V W Y and Shen, L Y (2010) On applications of an optimal price-time bidding model in Hong Kong foundation projects. Construction Innovation, 10(1), pp. 14-24. ISSN 1471-4175
Tamburro, N and Wood, P (2014) Alliancing in Australia: Competing for thought leadership. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 75-82. ISSN 17514304
Tan, Y (2006) A case-based reasoning approach to improve risk identification in construction projects. PhD thesis, University of Leeds, UK.
Tang, X.; Zhang, S.; Wang, M. and Sepasgozar, S. M. E. (2026) Understanding the construction digital technology assimilation process in AEC companies: Exploration based on grounded theory and verification of SEM. Journal of Construction Engineering and Management, 152(9): 04026143, ISSN 0733-9364
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Tang, W; Qiang, M; Duffield, C F; Young, D M and Lu, Y (2007) Risk management in the Chinese construction industry. Journal of Construction Engineering and Management, 133(12), pp. 944-956. ISSN 0733-9364
Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531
Tao, X (2023) Distributed common data environment for secure BIM-based collaborative design using blockchain technology. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Tao, Y; Hu, H; Xu, F and Zhang, Z (2023) Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory. Journal of Construction Engineering and Management, 149(6): 04023034, ISSN 0733-9364
Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364
Tao, Y; Hu, H; Xu, F and Zhang, Z (2025) Ergonomic risk mitigation through workforce planning for construction projects. Journal of Construction Engineering and Management, 151(4): 04025012, ISSN 0733-9364
Tapia, Ricardo M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. PhD thesis, Iowa State University, USA.
Tariq, S and Zhang, X (2021) Critical analysis of the private sector roles in water PPP failures. Journal of Construction Engineering and Management, 147(4): 04021015, ISSN 0733-9364
Taroun, A (2012) Decision support system (DSS) for construction project risk analysis and evaluation via evidential reasoning (ER). PhD thesis, University of Manchester, UK.
Tavassolirizi, M; Sarvari, H; Chan, D W M and Olawumi, T O (2022) Factors affecting delays in rail transportation projects using analytic network process: The case of Iran. International Journal of Construction Management, 22(14), pp. 2712-2723. ISSN 1562-3599
Tawalare, A and Laishram, B (2018) Relational contracting conceptual model for public sector construction organisations: An Indian context. Construction Economics and Building, 18(2), pp. 70-91. ISSN 2204-9029
Tawalare, A and Laishram, B (2020) Factors hindering effective partnering in Indian public sector construction organizations. Journal of Financial Management of Property and Construction, 25(1), pp. 83-105. ISSN 1366-4387
Tawalare, A; Laishram, B and Thottathil, F (2020) Relational partnership in public construction organizations: Front-line employee perspective. Journal of Construction Engineering and Management, 146(1): 04019086, ISSN 0733-9364
Taylor, M D; Wamuziri, S C and Smith, I G N (2001) Strategic mechatronics investment: Understanding the managerial options. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Teller, J (2001) An on-line glossary as a way to foster the construction of a common culture among urban experts, stakeholders and decision-makers. Construction Innovation, 1(4), pp. 259-271. ISSN 1471-4175
Tembo-Silungwe, C K and Khatleli, N (2018) Identification of enablers and constraints of risk allocation using structuration theory in the construction industry. Journal of Construction Engineering and Management, 144(5): 04018021, ISSN 0733-9364
Tembo-Silungwe, C K and Khatleli, N (2022) Development of risk misallocation causal networks using interpretive judgement in the construction industry. International Journal of Construction Management, 22(10), pp. 1935-1949. ISSN 1562-3599
Teo, M M and Loosemore, M (2011) Community-based protest against construction projects: A case study of movement continuity. Construction Management and Economics, 29(2), pp. 131-144. ISSN 1466433X
Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364
Tetteh, M O and Chan, A P C (2019) Review of concepts and trends in international construction joint ventures research. Journal of Construction Engineering and Management, 145(10): 04019057, ISSN 0733-9364
Thakur, K A (2016) Empirical analysis to investigate the influence of cultural dimensions on risk-taking behavior among Hispanic and non-Hispanic construction workers in United States. PhD thesis, University of Tennessee, USA.
Thilakarathne, N; Rathnasinghe, A P; Kulatunga, U; Thurairajah, N and Weerasinghe, L (2023) An investigation of the conflict management strategies in international construction joint ventures of Sri Lanka. Journal of Financial Management of Property and Construction, 28(3), pp. 273-292. ISSN 1366-4387
Thomas, H R; Heuer, D W and Filippelli, R L (1984) Settlement of construction jurisdictional disputes. Journal of Construction Engineering and Management, 110(2), pp. 165-177. ISSN 0733-9364
Thomas, H R; Smith, G R and Mellott, R E (1994) Interpretation of construction contracts. Journal of Construction Engineering and Management, 120(2), pp. 321-336. ISSN 0733-9364
Thomas, H R; Smith, G R and Ponderlick, R M (1992) Resolving contract disputes based on differing-site-condition clause. Journal of Construction Engineering and Management, 118(4), pp. 767-779. ISSN 0733-9364
Thomas, H R; Smith, G R and Ponderlick, R M (1992) Resolving contract disputes based on misrepresentations. Journal of Construction Engineering and Management, 118(3), pp. 472-487. ISSN 0733-9364
Thomas, H R; Smith, G R and Wright, D E (1990) Resolving disputes over contract notice requirements. Journal of Construction Engineering and Management, 116(4), pp. 738-755. ISSN 0733-9364
Thomas, H R; Smith, G R and Wright, D E (1991) Legal aspects of oral change orders. Journal of Construction Engineering and Management, 117(1), pp. 148-162. ISSN 0733-9364
Thomas Ng, S; Skitmore, R M and Smith, N J (1999) Decision-makers' perceptions in the formulation of pre-qualification criteria. Engineering, Construction and Architectural Management, 6(2), pp. 155-165. ISSN 0969-9988
Thomson, C S and El-Haram, M A (2019) Is the evolution of building sustainability assessment methods promoting the desired sharing of knowledge amongst project stakeholders? Construction Management and Economics, 37(8), pp. 433-460. ISSN 01446193
Thomson, C S; El-Haram, M A; Hardcastle, C and Horner, R M W (2008) Developing an urban sustainability assessment protocol reflecting the project lifecycle. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Thomson, D (2011) A pilot study of client complexity, emergent requirements and stakeholder perceptions of project success. Construction Management and Economics, 29(1), pp. 69-82. ISSN 1466433X
Thomson, W (2015) China constructs: Architecture, labor, and value on a Chinese construction site. PhD thesis, New York University, USA.
Thoradeniya, D; Jayasinghe, C; Ariyaratne, I E and Basnayake, G B M A (2026) Construction quality framework for school buildings: Damage detection and rectification prioritization. International Journal of Construction Management, 26(4), pp. 660-678. ISSN 1562-3599
Thörnqvist, C and Woolfson, C (2012) When tender turns tough: Posted workers and the tendering regime in the Swedish construction industry. Construction Management and Economics, 30(7), pp. 525-533. ISSN 1466433X
Tian, S; Abdalla, A; Tang, Y; Zhang, G and Cao, X (2026) Construction disputes: A systematic review of definitions, antecedents, and resolutions. International Journal of Construction Management, 26(5), pp. 857-874. ISSN 1562-3599
Tian, B; Fu, J; Xu, Y and Sun, L (2024) How does contract flexibility affect the sustainability performance of public–private partnership projects? A serial multiple mediator model. Engineering, Construction and Architectural Management, 31(1), pp. 28-47. ISSN 0969-9988
Tian, S; Abdalla, A; Zhang, G; Tang, Y and Cao, X (2025) Pathways of construction dispute formation in China: A DEMATEL, AISM, and MICMAC-based approach. Journal of Construction Engineering and Management, 151(10): 05025013, ISSN 0733-9364
Tiew, S Y (2025) Performance barriers and competence development of graduate architects in construction contract administration (cca): The mediating role of cca skills. Engineering, Construction and Architectural Management, 32(8), pp. 5609-5637. ISSN 0969-9988
Tiew, S Y; Aman Hashim, H and Zolkafli @ Zulkifly, U K (2025) Factors influencing the effectiveness of graduate architects as construction contract administrators (cca). Engineering, Construction and Architectural Management, 32(1), pp. 332-348. ISSN 0969-9988
Tobin, A G V (2009) Conflict-resolution competencies for the construction professional. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 181-184. ISSN 17514312
Tong, R; Zhang, N; Wang, X and Zhao, H (2020) Impact of safety management system on safety performance: The mediating role of safety responsibility. Engineering, Construction and Architectural Management, 27(10), pp. 3155-3170. ISSN 0969-9988
Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking. PhD thesis, Luleå University of Technology, Sweden.
Torkanfar, Navid (2025) Blockchain-enabled digitalized trust in construction industry: Reforming trust and collaboration through technology. PhD thesis, University of Toronto, Canada.
Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Toğan, V; Mostofi, F and Tokdemir, O B (2026) Evaluating the resilience of graph neural network architectures to adversarial and noisy data in high-stakes construction project management. Journal of Construction Engineering and Management, 152(4): 04026029, ISSN 0733-9364
Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364
Tran, H and Carmichael, D G (2013) A contractor's classification of owner payment practices. Engineering, Construction and Architectural Management, 20(1), pp. 29-45. ISSN 0969-9988
Treacy, D; Spillane, J P and Tansey, P (2016) Construction disputes in small to medium enterprise's in Ireland during recession: Identification of critical factors. International Journal of Law in the Built Environment, 8(1), pp. 21-41. ISSN 1756-1450
Trushell, I (2016) Everything's coming up (silk) roses. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Trushell, I; Clark, B and Agapiou, A (2014) Construction mediation in Scotland: An investigation into attitudes and experiences of mediation practitioners. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Trushell, I; Clark, B and Agapiou, A (2016) Construction mediation in Scotland: An investigation into attitudes and experiences of mediation practitioners. International Journal of Law in the Built Environment, 8(2), pp. 101-122. ISSN 1756-1450
Trushell, I and Egware, O (2015) Formal education and the practise of negotiation: Benefits for quantity surveyors. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Trushell, I and Morrison, S (2015) Ownership of materials: A Scottish/English dichotomy. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Tsai, H; Wang, L and Lin, L (2007) A study on improving the ranking procedure for determining the most advantageous tender. Construction Management and Economics, 25(5), pp. 545-554. ISSN 1466433X
Tsai, H; Wang, L C and Lee, J W (2006) Exploration of ranking method of group decision making. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Tsai, I T (2007) Default and renegotiation: Financial structure and incentive in public-private partnership contracts. PhD thesis, Massachusetts Institute of Technology, USA.
Tsai, J S and Chi, C S F (2009) Influences of Chinese cultural orientations and conflict management styles on construction dispute resolving strategies. Journal of Construction Engineering and Management, 135(10), pp. 955-964. ISSN 0733-9364
Tsai, J S and Chi, C S F (2015) Learning for win-win collaboration. Journal of Construction Engineering and Management, 141(7): 4015013, ISSN 0733-9364
Tserng, H P; Liao, H H; Jaselskis, E J; Tsai, L K and Chen, P C (2012) Predicting construction contractor default with barrier option model. Journal of Construction Engineering and Management, 138(5), pp. 621-630. ISSN 0733-9364
Tserng, H P; Liao, H H; Tsai, L K and Chen, P C (2011) Predicting construction contractor default with option-based credit models-models' performance and comparison with financial ratio models. Journal of Construction Engineering and Management, 137(6), pp. 412-420. ISSN 0733-9364
Tucker, J R; Pearce, A R; Bruce, R D; McCoy, A P and Mills, T H (2012) The perceived value of green professional credentials to credential holders in the US building design and construction community. Construction Management and Economics, 30(11), pp. 963-979. ISSN 1466433X
Tuffaha, F M; Assaf, S; Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), pp. 195-213. ISSN 2044-124X
Tumbare, M J (2013) Sedimentation of small and medium sized dams: Discussion issues. Journal of Engineering, Design and Technology, 11(2), pp. 112-128. ISSN 1726-0531
Tuuli, M M and Rowlinson, S (2009) Performance consequences of psychological empowerment. Journal of Construction Engineering and Management, 135(12), pp. 1334-1347. ISSN 0733-9364
Tzoumis, K A (1992) The role of public involvement in managing political conflict: A comparative case study of public involvement activities in siting low-level radioactive waste disposal facilities. PhD thesis, Texas A&M University, USA.
Udeaja, C and Aziz, Z (2015) A case study of fostering multidisciplinary in built environment using BIM. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Uher, T and Brand, M (2007) A comparative analysis of the operation of 'compulsory rapid adjudication' in New South Wales and New Zealand. Construction Management and Economics, 25(7), pp. 765-775. ISSN 1466433X
Uher, T E (1999) Partnering performance in Australia. Journal of Construction Procurement, 5(2), pp. 163-176. ISSN 1358-9180
Uher, T E and Brand, M C (2008) Claimants' view of the performance of adjudication in New South Wales. Engineering, Construction and Architectural Management, 15(5), pp. 470-484. ISSN 0969-9988
Umeokafor, N (2018) An investigation into public and private clients' attitudes, commitment and impact on construction health and safety in Nigeria. Engineering, Construction and Architectural Management, 25(6), pp. 798-815. ISSN 0969-9988
Un, B; Erdiş, E; Aydınlı, S; Genç, O and Alboga, O (2025) Forecasting the outcomes of construction contract disputes using machine learning techniques. Engineering, Construction and Architectural Management, 32(10), pp. 6421-6444. ISSN 0969-9988
Unwin, S (2007) Analysing architecture through drawing. Building Research & Information, 35(1), pp. 101-110. ISSN 0961-3218
Utomo, C and Rahmawati, Y (2020) Agreement options for negotiation on material location decision of housing development. Construction Innovation, 20(2), pp. 209-222. ISSN 1471-4175
V Nithyapriyadharshini (2017) A study on the workplace issues faced by women labours in the construction industry in Chennai city. PhD thesis, Mother Teresa Womens University, India.
Vadithe, R. N.; Sreenu, N.; Kesari, B.; Chiranjeevi, V.; Mudavath, C. B. N. and Rajput, R. C. (2026) The role of HR analytics in driving organizational agility and operational performance: Evidence from the construction sector. Engineering, Construction and Architectural Management, 33(7), pp. 5318-5339. ISSN 0969-9988
Valentin, V (2011) Impact assessment of inter-organizational dynamics on the performance metrics of capital-intensive projects. PhD thesis, Purdue University, USA.
Valentin, W S and Vorster, F S (2012) Understanding construction project failure in Southern Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 19-26. ISSN 17514312
Van Bohemen, H D (2004) Ecological engineering and civil engineering works. PhD thesis, Delft University of Technology, Netherlands.
Van Tam, N (2025) Impact of self-efficacy on construction labor productivity: The mediating role of work motivation. Engineering, Construction and Architectural Management, 32(5), pp. 3407-3431. ISSN 0969-9988
VanDemark, L P (2021) Mitigating risk of site development disputes. PhD thesis, University of Colorado at Denver, USA.
Verheij, J M (2005) Process-mediated planning of AEC projects through structured dialogues. PhD thesis, Georgia Institute of Technology, USA.
Verma, M. and Yadav, P. (2025) Gig economy: Workplace incivility's impact through culture, digital skills, and well-being. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 116-123. ISSN 1751-4304
Vernali, R J (1992) The case of the California contractors state license board: A palette of conflict resolution strategies for the 1990s. DPA thesis, Golden Gate University, USA.
Verwey, J; Cumberlege, R and Crafford, G J (2023) Exploring the interplay between quantity surveyors' conflict-handling styles and personality traits. Journal of Construction Business and Management, 6(2), pp. 38-49. ISSN 2521-0165
Verzobio, A (2020) Supporting rational decision-making in civil engineering. PhD thesis, University of Strathclyde, UK.
Vidogah, W (1997) Claims on construction contracts: a new management framework. PhD thesis, University of Wolverhampton, UK.
Vijayakumar, A.; Mahmood, M. N.; Gurmu, A.; Kamardeen, I. and Alam, S. (2025) Causal relationships among social sustainability indicators for freeways. Construction Innovation, 26(5), pp. 1413-1442. ISSN 1471-4175
Vo, H. M. and Yang, J. B. (2026) Incorporating stakeholder perception into risk assessment model: An empirical study of highway construction projects. Engineering, Construction and Architectural Management, 33(7), pp. 5244-5274. ISSN 0969-9988
Voelker, C; Permana, A; Sachs, T and Tiong, R (2008) Political risk perception in Indonesian power projects. Journal of Financial Management of Property and Construction, 13(1), pp. 18-34. ISSN 1366-4387
Voordijk, H (2023) Technical mediation and digital technologies in construction practice. Architectural Engineering and Design Management, 19(2), pp. 110-124. ISSN 1745-2007
Voordijk, H; Vahdatikhaki, F and Hesselink, L (2025) Digital twin–based asset inspection and user–technology interactions. Journal of Engineering, Design and Technology, 23(2), pp. 406-422. ISSN 1726-0531
Voordijk, J T (2019) Technological mediation in construction: Postphenomenological inquiry into digital technologies. Journal of Construction Engineering and Management, 145(12): 04019084, ISSN 0733-9364
Wah, T K (2018) Legal analysis of construction defect claims within common law jurisdictions for Malaysia. PhD thesis, University of Malaya, Malaysia.
Wall, C J and Fellows, R (2010) The dispute resolution adviser (dra) system in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 179-184. ISSN 17514312
Wall, R; Ankrah, N and Charlson, J (2016) An investigation into the different styles of the lawyer and construction specialist when mediating construction disputes. International Journal of Law in the Built Environment, 8(2), pp. 137-160. ISSN 1756-1450
Walls, D B (2013) World-class safety program. PhD thesis, Dallas Baptist University, USA.
Wamuziri, S and Jiang, M (2008) Role of export credit agencies in PFI/PPP projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 163-169. ISSN 17514312
Wan, X; Zhang, Y; Mao, P; Li, H; Wang, R; Yi, X and Zhao, X (2022) How perceived corporate social responsibility and public knowledge affect public participation intention: Evidence from Chinese waste incineration power projects. Engineering, Construction and Architectural Management, 29(10), pp. 4107-4131. ISSN 0969-9988
Wang, C and Zhang, S (2025) The impact of trust and risk perception on contractors' bid/no-bid decision-making in China: A multiple mediation model. Engineering, Construction and Architectural Management, 32(10), pp. 6980-7005. ISSN 0969-9988
Wang, Y. and Zou, P. X. W. (2026) Uncovering key construction injury causal factors using topic modeling and word co-occurrence network analysis methods. Journal of Construction Engineering and Management, 152(10): 04026168, ISSN 0733-9364
Wang, B; Cui, Q and Zhang, S (2021) Noncompete provision design for transportation PPP projects. Journal of Construction Engineering and Management, 147(2): 04020159, ISSN 0733-9364
Wang, D; Fang, S and Li, K (2019) Dynamic changes of governance mechanisms in mega construction projects in China: The mediating role of opportunism. Engineering, Construction and Architectural Management, 26(4), pp. 723-735. ISSN 0969-9988
Wang, D; Huang, R; Qiao, Y; Sheng, Z; Li, K and Zhao, L (2023) How perceived leader-member exchange differentiation affects construction workers' safety citizenship behavior: Organizational identity and felt safety responsibility as mediators. Journal of Construction Engineering and Management, 149(11): 04023110, ISSN 0733-9364
Wang, H (2000) A follow-up study of workers with soft tissue injuries using the databases of the Ontario workplace safety and insurance board (WSIB). PhD thesis, University of Toronto, Canada.
Wang, H; Hamilton, A; Song, Y and Tah, J (2007) Implementation of a data integration service for building and urban planning. Architectural Engineering and Design Management, 3(3), pp. 195-208. ISSN 1745-2007
Wang, J (2022) BIM and construction dispute management. PhD thesis, University of Manchester, UK.
Wang, J; Liang, M and Liao, P C (2024) Toward an intuitive device for construction hazard recognition management: Eye fixation-related potentials in reinvestigation of hazard recognition performance prediction. Journal of Construction Engineering and Management, 150(5): 04024028, ISSN 0733-9364
Wang, J; Zhang, S; Fenn, P; Luo, X; Liu, Y and Zhao, L (2023) Adopting BIM to facilitate dispute management in the construction industry: A conceptual framework development. Journal of Construction Engineering and Management, 149(1): 03122010, ISSN 0733-9364
Wang, N and Horner, R M W (2007) Fuzzy rule based system approach to assess cleaning costs of carpet flooring. Journal of Financial Management of Property and Construction, 12(1), pp. 25-36. ISSN 1366-4387
Wang, P (2019) The aetiology and progression of construction disputes between client and contractor in the UK. PhD thesis, University of Manchester, UK.
Wang, P; Fenn, P and Wang, K (2024) A novel approach for construction disputes causal inferences based on empirical data: A case-controlled method combined with Bradford Hill criteria. Engineering, Construction and Architectural Management, 31(11), pp. 4625-4644. ISSN 0969-9988
Wang, R; Lee, C J; Hsu, S C and Chen, J H (2021) Preventing or encouraging illegal activities by construction firms: Effects of top management team compensation and aspiration-performance discrepancies. Engineering, Construction and Architectural Management, 28(6), pp. 1739-1760. ISSN 0969-9988
Wang, T; Tang, W; Qi, D; Shen, W and Huang, M (2016) Enhancing design management by partnering in delivery of international EPC projects: Evidence from Chinese construction companies. Journal of Construction Engineering and Management, 142(4): 04015099, ISSN 0733-9364
Wang, X; Qiao, Y; Wang, D; Sheng, Z and Newaz, M T (2021) Psychological contract of safety and construction worker behavior: Felt safety responsibility and safety-specific trust as mediators. Journal of Construction Engineering and Management, 147(11): 04021152, ISSN 0733-9364
Wang, X; Shi, L; Wang, B and Kan, M (2020) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(2), pp. 483-501. ISSN 0969-9988
Wang, Y (2024) Towards automated contract analysis: Applying language models to risk identification in the context of public-private partnerships. PhD thesis, University of Maryland, College Park, USA.
Wang, Y; Chen, L and Zhuang, J (2023) Pricing of credit default swaps from the perspective of credit enhancement in PPP projects. Journal of Construction Engineering and Management, 149(6): 05023006, ISSN 0733-9364
Wang, Y; Gong, E; Zhang, Y; Yao, Y and Zhou, X (2024) Risk assessment of infrastructure reits projects based on cloud model: A case study of China. Engineering, Construction and Architectural Management, 31(11), pp. 4330-4352. ISSN 0969-9988
Wang, Zhuoyuan (2019) Effects of main contractors' service quality on subcontractors' behaviours and project outcomes in the Chinese construction industry. PhD thesis, University of New South Wales, Australia.
Waqar, A; Othman, I B and Mansoor, M S (2025) Building information modeling (BIM) implementation and construction project success in Malaysian construction industry: Mediating role of project control. Engineering, Construction and Architectural Management, 32(9), pp. 6095-6114. ISSN 0969-9988
Ward, P (2011) A UK and Australian perspective of the suitability of the scl protocols' provisions for dealing with float for adoption and use by the Australian construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ward, P and Jefferies, M (2014) Are Australian standard forms of construction contract capable of dealing with the issue of extensions of time efficiently and effectively? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ward, P; Sher, W; Gameson, R and Aranda-Mena, G (2007) Innovative protocols and technologies as a means of complying with the building and construction industry security of payments act 1999 (NSW) Australia. Construction Management and Economics, 25(7), pp. 747-763. ISSN 1466433X
Warille, J B (2016) Sustainable compensation methods for construction companies operating in turbulent environments: A case of South Sudan. PhD thesis, University of Liverpool, UK.
Watson, M; Deshpande, N and Lasch, C (2025) Disaster vulnerability of the construction industry: Comparing impacts of hurricanes and the COVID-19 pandemic on Florida construction companies. Construction Management and Economics, 43(5), pp. 323-339. ISSN 0144-6193
Watt, David (2012) Critical contractor selection factors for major projects. PhD thesis, University of New South Wales, Australia.
Waziri, B S (2018) Pareto analysis of critical risk factors of build operate and transfer projects in Nigeria. Journal of Construction Business and Management, 2(1), pp. 33-40. ISSN 2521-0165
Weddikkara, C (2003) The impact of professional culture on dispute resolution in the building industries of Australia and Sri-Lanka. PhD thesis, Murdoch University, Australia.
Weerasuriya, G T; Perera, S and Calheiros, R N (2025) Technological imperatives for issues in the certification of quality, progress, and payments in construction projects: A systematic review. Construction Economics and Building, 25(1), pp. 25-48. ISSN 2204-9029
West, Omona-a (2024) Cloud-based digital technology platform for improving productivity performance of construction small medium enterprises. PhD thesis, Bond University, Australia.
Whaley, A (2020) Conflict and claims culture in construction. PhD thesis, University of Salford, UK.
Whaley, A; McAdam, B and Crowe, P (2015) The acceleration dilemma: Can English law accommodate constructive acceleration? International Journal of Law in the Built Environment, 7(3), pp. 248-267. ISSN 1756-1450
Wibowo, A; Permana, A; Kochendörfer, B; Kiong, R T L; Jacob, D and Neunzehn, D (2012) Modeling contingent liabilities arising from government guarantees in Indonesian BOT/PPP toll roads. Journal of Construction Engineering and Management, 138(12), pp. 1403-1410. ISSN 0733-9364
Wiguna, I P A and Scott, S (2006) Relating risk to project performance in Indonesian building contracts. Construction Management and Economics, 24(11), pp. 1125-1135. ISSN 1466433X
Wijetunge, J (2010) Assessment of potential tsunamigenic seismic hazard to Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 1(2), pp. 207-220. ISSN 1759-5916
Wiley, K J L L (2003) The relationship between HR safety practices and organizational safety outcomes. PhD thesis, University of Iowa, USA.
Williams, P J and Williams, A M (2016) Sustainability and planning law in Australia: Achievements and challenges. International Journal of Law in the Built Environment, 8(3), pp. 226-242. ISSN 1756-1450
Woldesenbet, A; Jeong, D H S and Oberlender, G D (2012) Daily work reports-based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), pp. 481-490. ISSN 0733-9364
Wong, C F; Lau, S H; Tan, O K and Yap, J B H (2025) Critical factors influencing the adoption of building information modelling (BIM) using technological adoption framework and structural equation modelling. Engineering, Construction and Architectural Management, 32(2), pp. 967-986. ISSN 0969-9988
Wong, K-w K (2014) Integrative approach to addressing societal needs in infrastructure development projects. PhD thesis, University of Hong Kong, Hong Kong.
Wong, P S P; Cheung, S O and Ho, P K M (2005) Contractor as trust initiator in construction partnering: prisoner's dilemma perspective. Journal of Construction Engineering and Management, 131(10), pp. 1045-1053. ISSN 0733-9364
Wong, W F and Cheah, C Y J (2004) Issues of contractual chain and sub-contracting in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Woods, U (2016) Adverse possession and boundary disputes: Lessons for Ireland from abroad. International Journal of Law in the Built Environment, 8(1), pp. 56-79. ISSN 1756-1450
Wright, J (2009) Mediation and dispute boards. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 175-179. ISSN 17514312
Wu, G; Hu, Z; Zheng, J; Zhao, X and Zuo, J (2021) Effects of structure characteristics of project network on conflicts and project success. Engineering, Construction and Architectural Management, 28(1), pp. 101-124. ISSN 0969-9988
Wu, G; Zhao, X; Zuo, J and Zillante, G (2019) Effects of team diversity on project performance in construction projects. Engineering, Construction and Architectural Management, 26(3), pp. 408-423. ISSN 0969-9988
Wu, H; Qian, Q K; Straub, A and Visscher, H J (2022) Factors influencing transaction costs of prefabricated housing projects in China: Developers' perspective. Engineering, Construction and Architectural Management, 29(1), pp. 476-501. ISSN 0969-9988
Wu, J; Kumaraswamy, M M and Soo, G (2011) Regulative measures addressing payment problems in the construction industry: A calculative understanding of their potential outcomes based on gametric models. Journal of Construction Engineering and Management, 137(8), pp. 566-573. ISSN 0733-9364
Wu, L; Mohamed, E; Jafari, P and Abourizk, S (2023) Machine learning-based Bayesian framework for interval estimate of unsafe-event prediction in construction. Journal of Construction Engineering and Management, 149(11): 04023118, ISSN 0733-9364
Wu, W; Wen, C; Yuan, Q; Chen, Q and Cao, Y (2025) Construction and application of knowledge graph for construction accidents based on deep learning. Engineering, Construction and Architectural Management, 32(2), pp. 1097-1121. ISSN 0969-9988
Wu, X; Zhang, L and Zhang, C (2025) Linking frontline construction workers' perceived abusive supervision to work engagement: Job insecurity as the game-changing mediation and job alternative as a moderator. Engineering, Construction and Architectural Management, 32(3), pp. 1739-1758. ISSN 0969-9988
Xia, N; Zhong, R; Wu, C; Wang, X and Wang, S (2017) Assessment of stakeholder-related risks in construction projects: Integrated analyses of risk attributes and stakeholder influences. Journal of Construction Engineering and Management, 143(8): 04017030, ISSN 0733-9364
Xiang, Jianjun (2014) Extreme heat and workers' health in South Australia: Association, perceptions, and adaptations in the workplace. PhD thesis, University of Adelaide, Australia.
Xie, L; Luo, Z and Xia, B (2024) Influence of psychosocial safety climate on construction workers' intent to stay, taking job satisfaction as the intermediary. Engineering, Construction and Architectural Management, 31(3), pp. 1298-1321. ISSN 0969-9988
Xie, L L; Yang, Y; Hu, Y and Chan, A P C (2014) Understanding project stakeholders' perceptions of public participation in China's infrastructure and construction projects: Social effects, benefits, forms, and barriers. Engineering, Construction and Architectural Management, 21(2), pp. 224-240. ISSN 0969-9988
Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Xiong, W and Zhang, X (2014) Concession renegotiation models for projects developed through public-private partnerships. Journal of Construction Engineering and Management, 140(5): 04014008, ISSN 0733-9364
Xiong, W and Zhang, X (2016) The real option value of renegotiation in public-private partnerships. Journal of Construction Engineering and Management, 142(8): 4016021, ISSN 0733-9364
Xiong, W; Zhang, X and Chen, H (2016) Early-termination compensation in public-private partnership projects. Journal of Construction Engineering and Management, 142(4): 04015098, ISSN 0733-9364
Xu, L and Zhang, Z (2025) Influence of residential physical environments on occupant experience: Considering the moderating effects of indoor plants and climate zones. Engineering, Construction and Architectural Management, 32(9), pp. 5814-5838. ISSN 0969-9988
Xu, Y; Wu, H; Chi, M; Lee, C Y; Chong, H Y and Skitmore, M (2026) Blockchain-enabled value co-creation in construction projects: Evidence from a moderated mediation model in China. Building Research & Information, 54(2), pp. 198-215. ISSN 0961-3218
Xu, Y; Chan, A P C and Yeung, J F Y (2010) Developing a fuzzy risk allocation model for PPP projects in China. Journal of Construction Engineering and Management, 136(8), pp. 894-903. ISSN 0733-9364
Xuan, X; Huang, Y and Zhang, Z (2025) Effects of IEQ on inpatients' psychological restoration in hospital wards: The role of environmental perceptions. Building Research & Information, 53(8), pp. 1014-1038. ISSN 0961-3218
Xue, H; Zhang, S; Chen, J; Cong, W; Wu, G and Zhao, X (2024) Effects of organizational elements on emerging information and construction management technology implementation in building professionals: Moderating role of top management support. Journal of Construction Engineering and Management, 150(10): 04024123, ISSN 0733-9364
Yan, Yuh-Ming (2004) Prediction and management of construction disputes. PhD thesis, University of Manchester, UK.
Yang, J; Liu, Q; Ye, G; Du, Q; Bai, L and Yue, H (2025) Mediating mechanism of construction noise on workers' safety behavior: Evidence from EEG data. Journal of Construction Engineering and Management, 151(10): 04025148, ISSN 0733-9364
Yang, J; Shen, P Q; Bourne, L; Ho, C M F and Xue, X (2011) A typology of operational approaches for stakeholder analysis and engagement. Construction Management and Economics, 29(2), pp. 145-162. ISSN 1466433X
Yang, J B and Tsai, M K (2011) Computerizing ICBF method for schedule delay analysis. Journal of Construction Engineering and Management, 137(8), pp. 583-591. ISSN 0733-9364
Yang, J B and Yin, P C (2009) Isolated collapsed but-for delay analysis methodology. Journal of Construction Engineering and Management, 135(7), pp. 570-578. ISSN 0733-9364
Yang, K (2018) Sensing workers' responsive behaviors for identifying safety hazards in construction. PhD thesis, University of Nebraska - Lincoln, USA.
Yang, W; Firouzi, A and Li, C Q (2023) Risk transfer in project finance loans for toll road using credit default swaps. Journal of Financial Management of Property and Construction, 28(1), pp. 1-21. ISSN 1366-4387
Yao, H; Chen, Y; Chen, Y and Zhu, X (2019) Mediating role of risk perception of trust and contract enforcement in the construction industry. Journal of Construction Engineering and Management, 145(2): 4018130, ISSN 0733-9364
Yap, J B H; Abdul-Rahman, H and Wang, C (2018) Preventive mitigation of overruns with project communication management and continuous learning: PLS-SEM approach. Journal of Construction Engineering and Management, 144(5): 4018025, ISSN 0733-9364
Yari, N (2018) New model for bridge management system (bms): Bridge repair priority ranking system (brprs), case based reasoning for bridge deterioration, cost optimization, and preservation strategy. PhD thesis, University of New Hampshire, USA.
Yates, D J and Hardcastle, C (2002) The causes of conflict and disputes in construction: A transaction cost economics perspective. Journal of Financial Management of Property and Construction, 7(2), pp. 115-126. ISSN 1366-4387
Yates, D J and Hardcastle, C (2002) The causes of conflict and disputes in construction: A review of current research. Journal of Financial Management of Property and Construction, 7(3), pp. 203-214. ISSN 1366-4387
Ye, Xuling (2025) Blockchain-based smart contract realization in BIM environment: Technical adoption for reliable and collaborative construction management. PhD thesis, Ruhr-Universität Bochum, Germany.
Ye, Y X; Shan, M; Gao, X; Li, Q and Zhang, H (2024) Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques. International Journal of Construction Management, 24(15), pp. 1617-1629. ISSN 1562-3599
Yean Yng Ling, F; Ming Hsia Ang, A and su yu Lim, S (2007) Encounters between foreigners and Chinese: Perception and management of cultural differences. Engineering, Construction and Architectural Management, 14(6), pp. 501-518. ISSN 0969-9988
Yee, Tiew Si (2024) Developing a building contract administration framework for graduate architects managing housing projects. PhD thesis, University of Malaya, Malaysia.
Yeh, H H; Hsieh, T Y and Chen, J H (2017) Managing complex engineering interfaces of urban mass rapid transit projects. Journal of Construction Engineering and Management, 143(6): 05017001, ISSN 0733-9364
Yeh, Y C; Hsu, D S and Kuo, Y H (1991) Expert system for diagnosing damage of prestressed concrete pile. Journal of Construction Engineering and Management, 117(1), pp. 13-26. ISSN 0733-9364
Yevu, S K; Yu, A T W; Darko, A and Addy, M N (2021) Evaluation model for influences of driving forces for electronic procurement systems application in Ghanaian construction projects. Journal of Construction Engineering and Management, 147(8): 04021076, ISSN 0733-9364
Yitmen, I; Al-Musaed, A and Yücelgazi, F (2022) Anp model for evaluating the performance of adaptive façade systems in complex commercial buildings. Engineering, Construction and Architectural Management, 29(1), pp. 431-455. ISSN 0969-9988
Yiu, T W; Cheung, S O and Mok, F M (2006) Logistic likelihood analysis of mediation outcomes. Journal of Construction Engineering and Management, 132(10), pp. 1026-1036. ISSN 0733-9364
Yiu, T W; Cheung, S O and Siu, L Y (2012) Application of bandura's self-efficacy theory to examining the choice of tactics in construction dispute negotiation. Journal of Construction Engineering and Management, 138(3), pp. 331-340. ISSN 0733-9364
Yiu, T W and Chung, Y N (2014) Face-saving tactics as an aid to construction negotiation in Hong Kong. Engineering, Construction and Architectural Management, 21(6), pp. 609-630. ISSN 0969-9988
Yiu, T W and Lai, W Y (2009) Efficacy of trust-building tactics in construction mediation. Journal of Construction Engineering and Management, 135(8), pp. 683-689. ISSN 0733-9364
Yiu, T W and Law, Y M (2011) Moderating effect of equity sensitivity on behavior-outcome relationships in construction dispute negotiation. Journal of Construction Engineering and Management, 137(5), pp. 322-332. ISSN 0733-9364
Yiu, T W and Lee, H K (2011) How do personality traits affect construction dispute negotiation? Study of big five personality model. Journal of Construction Engineering and Management, 137(3), pp. 169-178. ISSN 0733-9364
Yogeswaran, K and Kumaraswamy, M M (1999) To instruct or not? The engineer's dilemma. Construction Management and Economics, 17(6), pp. 731-743. ISSN 01446193
Yoon, J H and Pishdad-Bozorgi, P (2022) State-of-the-art review of blockchain-enabled construction supply chain. Journal of Construction Engineering and Management, 148(2): 03121008, ISSN 0733-9364
Yoon, Jong Han (2023) Blockchain-enabled smart contract system for creating system-based trust in subcontracting process. PhD thesis, Georgia Institute of Technology, USA.
You, X (2010) Risk analysis in tunneling with imprecise probabilities. PhD thesis, University of Texas at Austin, USA.
Younis, G E (2010) Minimizing construction disputes. PhD thesis, University of Salford, UK.
Yousefi, S (2009) Attitude-based strategic and tactical negotiations for conflict resolution in construction. PhD thesis, University of Waterloo, USA.
Yousefi, Y; Jahangiri, M; Alidadi Shamsabadi, A and Raeesi Dehkordi, A (2019) Designing a mediator space and the study of its effect on the energy consumption of a residential building using EnergyPlus software in Savadkuh, Iran. Journal of Engineering, Design and Technology, 17(4), pp. 833-846. ISSN 1726-0531
Yu, M.; Zhao, J.; Lin, H. and Yuan, M. (2026) Keep company with the wolf, learn to howl: The impact of self-focused collective moral judgment on the misconduct of creative members in construction projects. Journal of Construction Engineering and Management, 152(7): 04026085, ISSN 0733-9364
Yu, Dongwen (2025) Last call for impartiality: The role of the contract administrator in construction contracts. PhD thesis, University of Manchester, UK.
Yu, X; Mehmood, K; Paulsen, N; Ma, Z and Kwan, H K (2021) Why safety knowledge cannot be transferred directly to expected safety outcomes in construction workers: The moderating effect of physiological perceived control and mediating effect of safety behavior. Journal of Construction Engineering and Management, 147(1): 1965, ISSN 0733-9364
Yuan, M; Wang, X; Zhang, Z; Lin, H and Yu, M (2024) How does collective moral judgment focus on the self-induce deviant behavior of construction workers? A multilevel investigation. Engineering, Construction and Architectural Management, 31(12), pp. 4809-4830. ISSN 0969-9988
Yung, P and Rafferty, K (2015) Statutory adjudication in Western Australia: Adjudicators' views. Engineering, Construction and Architectural Management, 22(1), pp. 54-72. ISSN 0969-9988
Yunpeng, G and Zaman, U (2024) Exploring mega-construction project success in China's vaunted belt and road initiative: The role of paternalistic leadership, team members' voice and team resilience. Engineering, Construction and Architectural Management, 31(9), pp. 3801-3825. ISSN 0969-9988
Yusof, N; Lai, K S and Marisa, A (2022) Influences of client focus and company type on innovation and financial performance in the construction industry. Construction Innovation, 22(4), pp. 749-767. ISSN 1471-4175
Zabihi Kolaei, A; Khanzadi, M and Ghodrati Amiri, G (2026) Integration of augmented reality and blockchain technologies for visualizing and documenting change orders in a building project: Case study. Journal of Construction Engineering and Management, 152(2): 04025251, ISSN 0733-9364
Zadawa, A N; Hussin, A A and Osmadi, A (2018) Mediating effects of enforcement on public procurement guidelines' compliance barriers and cost performance of construction projects in Nigerian federal universities: A process macro approach. Journal of Construction in Developing Countries, 23(1), pp. 81-102. ISSN 1823-6499
Zaky, N; Ahmed, M Z; Alarjani, A and Attia, E A (2025) Lean manufacturing implementation in iron and steel industries: Effect of wastes management on the production costs. Journal of Engineering, Design and Technology, 23(2), pp. 525-545. ISSN 1726-0531
Zampese, Ednei Rogerio de Souza (2013) Green marketing as a mediating factor between green supply chain management and organizational performance in Brazilian civil construction. PhD thesis, Universidade Presbiteriana Mackenzie, Brazil.
Zangeneh, P (2021) Knowledge representation and artificial intelligence for management of socio-technical risks in megaprojects. PhD thesis, University of Toronto, Canada.
Zapata Quimbayo, C A and Mejía Vega, C A (2023) Credit risk in infrastructure PPP projects under the real options approach. Construction Management and Economics, 41(4), pp. 293-306. ISSN 01446193
Zarghami, S A and Zwikael, O (2024) Buffer allocation in construction projects: a disruption mitigation approach. Engineering, Construction and Architectural Management, 31(10), pp. 3946-3972. ISSN 0969-9988
Zaw, T. T. and Santoso, D. S. (2026) Empowered to engage: The mediating role of psychological capital among Myanmar construction engineers. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X
Zeberga, M S; Haaskjold, H and Hussein, B (2024) Digital technologies for preventing, mitigating, and resolving contractual disagreements in the AEC industry: A systematic literature review. Journal of Construction Engineering and Management, 150(6): 03124002, ISSN 0733-9364
Zhai, H and Russell, J S (1999) Stochastic modelling and prediction of contractor default risk. Construction Management and Economics, 17(5), pp. 563-576. ISSN 01446193
Zhang, S; Bao, Z; Yu, X; Shi, X; Wang, B and Zhang, Y (2026) How safety knowledge impacts construction workers' risk perception: ERP study. Journal of Construction Engineering and Management, 152(1): 04025234, ISSN 0733-9364
Zhang, H M; Chong, H Y; Zeng, Y and Zhang, W (2023) The effective mediating role of stakeholder management in the relationship between BIM implementation and project performance. Engineering, Construction and Architectural Management, 30(6), pp. 2503-2522. ISSN 0969-9988
Zhang, J; Li, H; Xia, B; Skitmore, M; Pu, S; Deng, Q and Jin, W (2021) Development of a market-oriented efqm excellence model for analyzing the implementation of quality management in developing countries. International Journal of Construction Management, 21(9), pp. 884-909. ISSN 1562-3599
Zhang, K; Chen, L and Zhou, X (2025) Transmission of risk to China's construction industry due to international interest rate fluctuations. Engineering, Construction and Architectural Management, 32(3), pp. 1781-1797. ISSN 0969-9988
Zhang, L (2019) To insist or to concede? Chinese contractors' behavioural strategies when handling disputed construction claims. PhD thesis, University of Manchester, UK.
Zhang, L; Fenn, P and Fu, Y (2019) To insist or to concede? Contractors' behavioural strategies when handling disputed claims. Engineering, Construction and Architectural Management, 26(3), pp. 424-443. ISSN 0969-9988
Zhang, L; Fu, Y and Lu, W (2021) Contract enforcement for claimants' satisfaction with construction dispute resolution: Moderating role of shadow of the future, fairness perception, and trust. Journal of Construction Engineering and Management, 147(2): 04020168, ISSN 0733-9364
Zhang, L and Sun, H (2021) The impacts of ethical climate on knowledge contribution loafing among designers in engineering design firms: Mediated effect of knowledge leadership. Engineering, Construction and Architectural Management, 28(6), pp. 1807-1827. ISSN 0969-9988
Zhang, L; Yuan, J; Ning, Y; Xia, N and Zhang, G (2022) Enhancing the impacts of absorptive capacity on interorganizational collaboration in BIM-enabled construction projects: an slt perspective. Engineering, Construction and Architectural Management, 29(10), pp. 4215-4240. ISSN 0969-9988
Zhang, L; Yuan, J; Xia, N; Bouferguene, A and Al-Hussein, M (2020) Improving information sharing in major construction projects through OC and POC: RDT perspective. Journal of Construction Engineering and Management, 146(7): 04020068, ISSN 0733-9364
Zhang, M; Xue, X; Luo, T; Li, M and Tang, X (2024) The supportability evaluation of cross-regional major infrastructure projects based on the combination weighting of the game theory-cloud model. Engineering, Construction and Architectural Management, 31(9), pp. 3679-3705. ISSN 0969-9988
Zhang, N; Li, X and Yang, F (2025) Dual pathways of mindfulness in construction occupational psychological health: Long- and short-term mechanisms of positive emotions and psychological capital. Journal of Construction Engineering and Management, 151(12): 04025200, ISSN 0733-9364
Zhang, P; Li, N; Fang, D and Wu, H (2017) Supervisor-focused behavior-based safety method for the construction industry: Case study in Hong Kong. Journal of Construction Engineering and Management, 143(7): 05017009, ISSN 0733-9364
Zhang, P; Lingard, H; Blismas, N; Wakefield, R and Kleiner, B (2015) Work-health and safety-risk perceptions of construction-industry stakeholders using photograph-based q methodology. Journal of Construction Engineering and Management, 141(5): 04014093, ISSN 0733-9364
Zhang, Q; Liu, Z and Yang, S (2025) Enhancing construction workers' health and safety: Mechanisms for implementing construction 4.0 technologies in construction organizations. Engineering, Construction and Architectural Management, 32(13), pp. 68-103. ISSN 0969-9988
Zhang, R P and McDermott, V (2017) Corporate governance, incentive schemes, and safety performance in the construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Zhang, S B; Chen, J and Fu, Y (2020) Contract complexity and trust in construction project subcontracting. Engineering, Construction and Architectural Management, 27(9), pp. 2477-2500. ISSN 0969-9988
Zhang, X; Li, Y and Wu, D (2020) Developing an underground utility occupation index for efficient urban utilities planning. Journal of Construction Engineering and Management, 146(5): 04020036, ISSN 0733-9364
Zhang, Y (2012) An investigation on cooperative behaviors in the Chinese construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Zhao, J. and Xu, Z. (2026) A generalizable deep reinforcement learning-based algorithm for priority rule scheduling in stochastic resource-constrained project scheduling. Journal of Construction Engineering and Management, 152(9): 04026156, ISSN 0733-9364
Zhao, N; Liu, Q; Li, H; Siamuzwe-Manase, V and Skitmore, M (2026) How does mindful leadership affect individual innovative behavior in megaprojects?–a cross-level study. International Journal of Construction Management, 26(2), pp. 349-364. ISSN 1562-3599
Zhao, J (2020) Towards a proactive real-time data-driven musculoskeletal disorders prevention approach in construction. PhD thesis, Pennsylvania State University, USA.
Zhao, X; Hwang, B-G and Low, S P (2016) An enterprise risk management knowledge-based decision support system for construction firms. Engineering, Construction and Architectural Management, 23(3), pp. 369-384. ISSN 0969-9988
Zhao, X; Wu, P and Wang, X (2018) Risk paths in BIM adoption: Empirical study of China. Engineering, Construction and Architectural Management, 25(9), pp. 1170-1187. ISSN 0969-9988
Zheng, J; Gu, Y; Luo, L; Zhang, Y; Xie, H and Chang, K (2023) Identifying the definition, measurement, research focuses, and prospects of project complexity: A systematic literature review. Engineering, Construction and Architectural Management, 30(7), pp. 3043-3072. ISSN 0969-9988
Zheng, J; Gu, Y; Zhang, Z; Xie, H; Li, P and Li, H (2023) The relationship between empowering leadership and project performance: A resource perspective. Engineering, Construction and Architectural Management, 30(7), pp. 2969-2990. ISSN 0969-9988
Zheng, X; Hu, X; Wu, C and Bai, J (2025) Does owners' leadership matter to relational behavior in mega construction projects? A role orientation perspective. Engineering, Construction and Architectural Management, 32(6), pp. 3608-3629. ISSN 0969-9988
Zhong, B; Shen, L; Pan, X; Zhong, X and He, W (2024) Dispute classification and analysis: Deep learning-based text mining for construction contract management. Journal of Construction Engineering and Management, 150(1): 04023151, ISSN 0733-9364
Zhou, H; Zhou, L; Gao, B; Huang, W; Huang, W; Zuo, J and Zhao, X (2025) Intelligent identification of risks in construction contract clauses based on semantic reasoning. Engineering, Construction and Architectural Management, 32(10), pp. 6593-6626. ISSN 0969-9988
Zhou, S; Wang, H; Ng, S T; Li, D; Xie, S; Chen, K and Wang, W (2025) Building a construction law knowledge repository to enhance general-purpose large language model performance on domain question-answering: A case of China. Engineering, Construction and Architectural Management, 32(13), pp. 518-546. ISSN 0969-9988
Zhou, H; Gao, B; Tang, S; Li, B and Wang, S (2025) Intelligent detection on construction project contract missing clauses based on deep learning and NLP. Engineering, Construction and Architectural Management, 32(3), pp. 1546-1580. ISSN 0969-9988
Zhou, Q; Chen, S; Deng, X and Mahmoudi, A (2023) Knowledge transfer among members within cross-cultural teams of international construction projects. Engineering, Construction and Architectural Management, 30(4), pp. 1787-1808. ISSN 0969-9988
Zhou, Y; Liu, J; Pu, X and Ding, Y (2025) Signaling game analysis of transfer mechanisms of PPP projects: Considering investors' moral hazard and adverse selection behavior. Journal of Construction Engineering and Management, 151(5): 04025030, ISSN 0733-9364
Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.
Zhu, L and Cheung, S O (2021) Toward an equity-based analysis of construction incentivization. Journal of Construction Engineering and Management, 147(11): 04021148, ISSN 0733-9364
Zhu, L; Wei, X and Liang, R (2024) Navigating uncertainty: Optimizing contractor selection for megaprojects in group decision-making with multiple criteria. Journal of Construction Engineering and Management, 150(11): 04024157, ISSN 0733-9364
Zhu, X (2023) Machine learning supported multiple criteria decision making for project delivery system selection. PhD thesis, Queen's University Belfast, UK.
Zhu, Y; Brigham, J C and Fascetti, A (2025) Lidar-rgb data fusion for four-dimensional uav-based monitoring of reinforced concrete bridge construction: Case study of the fern hollow bridge reconstruction. Journal of Construction Engineering and Management, 151(1): 05024016, ISSN 0733-9364
Zhuang, J; Wang, Y; Yan, Z and Liu, J (2026) Evolutionary game analysis on the cooperative mechanism of government subsidies and market-based risk mitigation institutions in managing ecosustainable projects' default risks. Journal of Construction Engineering and Management, 152(3): 04025270, ISSN 0733-9364
Ziadat, W (2018) A meta-analysis study of project and programme management complexity in the oil and gas sector of the Middle East and North Africa region. PhD thesis, University of Manchester, UK.
Zohrehvandi, S; Vanhoucke, M; Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(2), pp. 502-524. ISSN 0969-9988
Zong, Z; Long, T; Ou, Y and Zhang, S (2025) Dual-path influence of risk perception on construction workers' safety participation and the moderating role of mindfulness. Journal of Construction Engineering and Management, 151(1): 04024194, ISSN 0733-9364
Zong, Z; Su, S; Diao, L; Ou, Y and Long, T (2025) Relationship between perceived occupational stigma and safety behavior of construction workers: Moderated mediation model. Journal of Construction Engineering and Management, 151(6): 04025041, ISSN 0733-9364
Zou, P X W and Zhang, G (2009) Comparative study on the perception of construction safety risks in China and Australia. Journal of Construction Engineering and Management, 135(7), pp. 620-627. ISSN 0733-9364
de La Garza, J M; Hancher, D E and Decker, L (1998) Analysis of safety indicators in construction. Journal of Construction Engineering and Management, 124(4), pp. 312-314. ISSN 0733-9364
de Leeuw, C P (1988) The pre-estimation of compensation payable in accordance with the contract price adjustment provisions of the building industry advisory council. DSc thesis, University of Pretoria, South Africa.
de Magalhães, F M R L (2010) Operational modal analysis for testing and monitoring of bridges and special structures. PhD thesis, Universidade do Porto, Portugal.
de Silva, C (2012) Health and safety: Teaching law, educating for prevention. International Journal of Law in the Built Environment, 4(3), pp. 233-246. ISSN 17561469
de la Garza, J M; Vorster, M C and Parvin, C M (1991) Total float traded as commodity. Journal of Construction Engineering and Management, 117(4), pp. 716-727. ISSN 0733-9364
ter Huurne, R (2021) The role of risk attitudes: Discrepancies between human and computer-based risk analysis in the utility sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
zu Ermgassen, S O S E (2022) Hard questions, concrete solutions: Mitigating the ecological impacts of the global infrastructure boom. PhD thesis, University of Kent, UK.
Çalışkan, E B (2022) A data-driven requirement elicitation system for pre-project stage. PhD thesis, Middle East Technical University, Turkey.
Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364
Up a level