Items with Subject: design criteria

Number of items: 264.

Abadi, M (2005) Issues and challenges in communication within design teams in the construction industry: Investigation the use of virtual teams and information and communication technologies in the UK construction industry. PhD thesis, University of Manchester, UK.

Abdul-Aziz, A R (1995) Examination of the eclectic paradigm as applied to international contracting ? With emphasis on the internalization dimension. Engineering, Construction and Architectural Management, 2(2), pp. 105-120. ISSN 0969-9988

Abeysekera, V and Shelke, M (2018) Construction as biological cells: An exploratory study. International Journal of Construction Management, 18(4), pp. 276-292. ISSN 1562-3599

Abiodun, O; Abadi, M; Ejohwomu, O and Manu, P (2024) Dimensions of maturity model for institutionalising smart circular construction: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Acheamfour, V K; Adjei-Kumi, T and Kissi, E (2023) Contractor selection: A review of qualification and pre-qualification systems. International Journal of Construction Management, 23(2), pp. 338-348. ISSN 1562-3599

Ahadzie, D K; Proverbs, D G; Olomolaiye, P O and Ankrah, N (2009) Towards developing competency-based measures for project managers in mass house building projects in developing countries. Construction Management and Economics, 27(1), pp. 89-102. ISSN 1466433X

Ahmad-Latiffi, A (2012) Performance measurement for construction businesses. PhD thesis, Loughborough University, UK.

Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.

Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.

Al Nasseri, H A; Widen, K and Aulin, R (2016) A taxonomy of planning and scheduling methods to support their more efficient use in construction project management. Journal of Engineering, Design and Technology, 14(3), pp. 580-601.

Al-Ameen, H A (2012) Antitrust: the person-centred approach. PhD thesis, Swansea University, UK.

Al-Kaisy, A and Nassar, K (2009) Developing a decision support tool for nighttime construction in highway projects. Journal of Construction Engineering and Management, 135(2), pp. 119-125. ISSN 0733-9364

Al-Maiyah, S; Brett Martinson, D and Elkadi, H (2024) Evaluation of the indoor environment in a historic museum during the COVID-19 lockdown in Northwest England. Building Research & Information, 52(7), pp. 748-764. ISSN 0961-3218

Alam, Shafiqul (2016) Developing life cycle environmental indicators for road infrastructure. PhD thesis, Queensland University of Technology, Australia.

Algraiw, I H A (2015) The engagement of expert opinions in the modeling of multi-attribute decision making for the selection of project delivery methods in building construction. PhD thesis, Missouri University of Science and Technology, USA.

Ali, H H; Sharif, A A and Shdaifat, N M (2025) Developing a sustainable self-sufficient temporary shelter unit for desert climate. Architectural Engineering and Design Management, 21(1), pp. 98-119. ISSN 1745-2007

Aloini, D; Dulmin, R; Mininno, V and Ponticelli, S (2012) A conceptual model for construction supply chain management implementation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Alves, J. L.; Almeida Filho, A. T. D.; Bradaschia, F. and Palha, R. P. (2026) Solarisbim.AI: Smart sustainable building planning with BIM-based solar-production estimation using machine-learning radiation forecasts. Journal of Construction Engineering and Management, 152(6): 04026076, ISSN 0733-9364

Ameh, H and Lamond, J (2025) Public preference of flood-resilient housing technologies in Nigeria: A case study of Kogi State. International Journal of Disaster Resilience in the Built Environment, 16(1), pp. 87-103. ISSN 1759-5908

Ankrah, N A and Proverbs, D (2005) A framework for measuring construction project performance: Overcoming key challenges of performance measurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ansell, M; Holmes, M; Evans, R; Pasquire, C and Price, A (2009) Delivering best value in highways major maintenance schemes: Case study. Journal of Construction Engineering and Management, 135(4), pp. 235-245. ISSN 0733-9364

Asah-Kissiedu, M (2019) Development of an integrated safety, health and environmental management capability maturity model for Ghanaian construction companies. PhD thesis, University of the West of England, Bristol, UK.

Assaf, G and Assaad, R H (2024) A data-driven decision-support tool for selecting the optimal project delivery method for bundled projects: Integrating machine learning and expert domain knowledge. Journal of Construction Engineering and Management, 150(12): 04024181, ISSN 0733-9364

Awuzie, B O and McDermott, P (2015) A conceptual model for evaluating infrastructure-based temporary multi-organisations. Built Environment Project and Asset Management, 5(1), pp. 103-120. ISSN 2044-124X

Ayegba, C and Root, D (2019) Application of signalling theory in contractor selection for long-term collaborative relationships in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Bai, L; Xie, X; Sun, Y; Qu, X and Han, X (2025) Assessing project criticality in project portfolio: A vulnerability modeling approach. Engineering, Construction and Architectural Management, 32(5), pp. 2890-2919. ISSN 0969-9988

Bakis, N (2009) Product data sharing in architecture, engineering and construction: Assessment of middleware support and business benefits. PhD thesis, University of Salford, UK.

Barnes, C J (1999) A methodology for the concurrent design of products and their assembly sequence. PhD thesis, Cranfield University, UK.

Barry, S; Cronin, W; Spillane, J P and Bradley, J G (2021) Compliance with COVID-19 regulations in micro-enterprises and SMEs in the Irish construction sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Bashir, Adnan (2022) The role of control modes in the performance of Australian and Pakistani construction projects. PhD thesis, University of Sydney, Australia.

Besaiso, H; Fenn, P; Emsley, M and Wright, D (2018) A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine: A perspective from the industry. Engineering, Construction and Architectural Management, 25(2), pp. 241-256. ISSN 0969-9988

Blismas, N; Gibb, A and Pasquire, C (2005) Assessing project suitability for off-site production. Construction Economics and Building, 5(1), pp. 9-15. ISSN 2204-9029

Bouachera, T; Kishk, M and Power, L (2007) Towards a generic framework for whole life costing in the oil industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Broadhurst, S J (2000) Non-man-entry sewer renovation robot characteristics. PhD thesis, Sheffield Hallam University, UK.

Burroughs, S (2006) Strength of compacted earth: Linking soil properties to stabilizers. Building Research & Information, 34(1), pp. 55-65. ISSN 0961-3218

Caldwell, Scott A (2024) Empirical decision-making tools as applied to seaports in the industry 4.0 paradigm. PhD thesis, Liverpool John Moores University, UK.

Carroll, Steven Paige (2005) Risk-based approach to on-site wastewater treatment system siting design and management. PhD thesis, Queensland University of Technology, Australia.

Cavill, C A (2014) Fitness for purpose evaluation of stables in current use in the UK. PhD thesis, University of Salford, UK.

Cha, H S (2003) Selecting value management processes for implementation on capital facility projects. PhD thesis, University of Texas at Austin, USA.

Cha, H S and O'Connor, J T (2005) Optimizing implementation of value management processes for capital projects. Journal of Construction Engineering and Management, 131(2), pp. 239-251. ISSN 0733-9364

Cheung, E; Chan, A P C and Kajewski, S (2010) Suitability of procuring large public works by PPP in Hong Kong. Engineering, Construction and Architectural Management, 17(3), pp. 292-308. ISSN 0969-9988

Chew, A T W and Ling, F Y Y (2002) Increasing Singapore's construction productivity through construction process re-engineering. Journal of Construction Research, 3(1), pp. 123-45. ISSN 1609-9451

Chiadighikaobi, P C and Ubani-Wokoma, B C (2025) Suitability of basalt textile-reinforced granite–periwinkle shell concrete for sustainable construction in Nigeria. Construction Economics and Building, 25(1), pp. 171-202. ISSN 2204-9029

Chidiobi, C (2022) Development of frameworks for the management of materials procurement and construction waste for Nigerian contractors. PhD thesis, University of the West of England, Bristol, UK.

Chua, D K H and Goh, Y M (2005) Poisson model of construction incident occurrence. Journal of Construction Engineering and Management, 131(6), pp. 715-722. ISSN 0733-9364

Clegg, D R; Campbell, K; Stephenson, P and Perera, T (1997) Planning road construction using simulation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cummins, A; Graham, B; Thomas, K and Lucey, T (2016) The effectiveness of managing through trust the middle management layer of a construction company: Proposed ethnographic research. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Dabarera, G K M; Perera, B A K S and Rodrigo, M N N (2019) Suitability of public-private-partnership procurement method for road projects in Sri Lanka. Built Environment Project and Asset Management, 9(2), pp. 199-213. ISSN 2044-124X

Dakhil, A J (2017) Building information modelling (BIM) maturity-benefits assessment relationship framework for UK construction clients. PhD thesis, University of Salford, UK.

Dawood, N N (1995) An integrated bidding management expert system for the make-to-order precast industry. Construction Management and Economics, 13(2), pp. 115-125. ISSN 01446193

De Oliveira, A L and Prudêncio, L R (2015) Evaluation of the superficial texture of concrete pavers using digital image processing. Journal of Construction Engineering and Management, 141(10): 04015034, ISSN 0733-9364

De Venny, A S (1999) Recycling of demolished masonry rubble. PhD thesis, Edinburgh Napier University, UK.

De Wilde, P J C J (2004) Computational support for the selection of energy saving building components. PhD thesis, Delft University of Technology, Netherlands.

Dinis, F A M (2023) Development and validation of BIM-based natural user interfaces for non-geometrical information management. PhD thesis, Universidade do Porto, Portugal.

Dreschler, M (2009) Fair competition: How to apply the 'economically most advantageous tender' award mechanism in the Dutch construction industry. PhD thesis, Delft University of Technology, Netherlands.

Eaton, D; Akbiyikli, R; de Lemos, T; Gunnigan, L; Ozen Kutanis, R; Casensky, M; Ladra, J and el Sawalhi, N (2007) An examination of the suitability of a UK PFI model within the Czech Republic, the Republic of Ireland, Palestine (Gaza-West bank), Portugal and Turkey. Construction Innovation, 7(1), pp. 122-142. ISSN 1471-4175

Edwards, D J and Holt, G D (2006) Hand-arm vibration controls: A perspective based on performance and cost dimensions. Journal of Financial Management of Property and Construction, 11(1), pp. 21-32. ISSN 1366-4387

Edwards, P J and Bowen, P A (1998) Risk and risk management in construction: towards more appropriate research techniques. Journal of Construction Procurement, 4(2), pp. 103-115. ISSN 1358-9180

Ekemode, B G; Adegoke, O J and Aderibigbe, A (2017) Factors influencing land title registration practice in Osun state, Nigeria. International Journal of Law in the Built Environment, 9(3), pp. 240-255. ISSN 1756-1450

El-Bibany, H E-D (1992) Architecture for human-computer design, management and coordination in a collaborative AEC environment. PhD thesis, Stanford University, USA.

El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.

Elimov, R (2003) The control of concrete quality during slipforming operations. PhD thesis, Universite de Sherbrooke, Canada.

Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects. PhD thesis, Heriot-Watt University, UK.

Esa, Mohd Reza (2018) Moving towards sustainable construction in Malaysia: A holistic model for construction and demolition (c&d) waste management. PhD thesis, University of Queensland, Australia.

Espada, R; Apan, A and McDougall, K (2017) Vulnerability assessment of urban community and critical infrastructures for integrated flood risk management and climate adaptation strategies. International Journal of Disaster Resilience in the Built Environment, 8(4), pp. 375-411. ISSN 1759-5916

Everett, J G (1991) Construction automation: Basic task selection and development of the cranium. PhD thesis, Massachusetts Institute of Technology, USA.

Eyre, N; Fawcett, T; Topouzi, M; Killip, G; Oreszczyn, T; Jenkinson, K and Rosenow, J (2023) Fabric first: Is it still the right approach? Buildings & Cities, 4(1), pp. 965-972. ISSN 2632-6655

Fagbenro, R. K.; Sunindijo, R. Y. and Illankoon, C. (2026) Prefabrication in construction: A pathway to improved mental health and well-being for workers. Engineering, Construction and Architectural Management, 33(15), pp. 249-275. ISSN 0969-9988

Famakin, I O; Aje, I O and Ogunsemi, D R (2012) Assessment of success factors for joint venture construction projects in Nigeria. Journal of Financial Management of Property and Construction, 17(2), pp. 153-165. ISSN 1366-4387

Felix, R (1988) The use of domestic building products by the owner-builder. PhD thesis, University of Leeds, UK.

Florencio, Lutemberg de Araújo (2018) Structuring of a rating system for the classification of risk of linking commercial real estate properties as guarantee for long-term credit operations. PhD thesis, Universidade de São Paulo, Brazil.

Folagbade, S O and Newlands, D M (2014) Suitability of cement combinations for carbonation resistance of structural concrete. Journal of Engineering, Design and Technology, 12(4), pp. 423-439.

Forghani, R; Sher, W and Kanjanabootra, S (2023) Critical technical design principles for maximizing the reuse of building components. International Journal of Construction Management, 23(7), pp. 1187-1195. ISSN 1562-3599

Fuller, R J (2004) Operating experiences with an advanced fabric energy storage system. Construction Economics and Building, 4(2), pp. 1-10. ISSN 2204-9029

Fung, I W H and Tam, V W Y (2013) Occupational health and safety of older construction workers (aged 55 or above): Their difficulties, needs, behaviour and suitability. International Journal of Construction Management, 13(3), pp. 15-34. ISSN 1562-3599

Gabriela Alves Tenório de, M; Claudia, R S d M S N; dos Santos, E B; Kleyton, M N d S; Fernandes, B S and Rachel Perez, P (2024) Integration potential between Revit and LEED: A review. Architectural Engineering and Design Management, 20(3), pp. 510-525. ISSN 1745-2007

Galbraith, G H; McLean, R C and Guo, J S (1998) Moisture permeability data presented as a mathematical relationship. Building Research & Information, 26(3), pp. 157-168. ISSN 0961-3218

Ganiyu, S (2021) Developing a Bim-Knowledge (Bim-K) framework for improved decision-making in building construction projects. PhD thesis, London South Bank University, UK.

Gao, T; Ergan, S; Akinci, B and Garrett, J H (2014) Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. Journal of Construction Engineering and Management, 140(3): 4013054, ISSN 0733-9364

Gatti, U C (2012) Measuring and evaluating physical strain to improve construction workforce productivity. PhD thesis, University of New Mexico, USA.

Ghannad, P and Lee, Y C (2023) Optimizing modularization of residential housing designs for rapid postdisaster mass production of housing. Journal of Construction Engineering and Management, 149(7): 04023046, ISSN 0733-9364

Ghannoum, M; Assaad, J; Daaboul, M and El-Mir, A (2025) Deterministic and stochastic finite element modeling of reinforced concrete beams without stirrups containing plastic wastes. International Journal of Building Pathology and Adaptation, 43(4), pp. 614-632. ISSN 2398-4708

Gilham, A (2010) A governance framework for sustainable development in the built environment. PhD thesis, De Montfort University, UK.

Goel, A (2023) Using secondary data in research on social sustainability in construction project management: A transition from "interview society" to "project-as-practice". Engineering, Construction and Architectural Management, 30(9), pp. 3858-3875. ISSN 0969-9988

Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(4), pp. 1048-1065. ISSN 1471-4175

Gonsalves, N; Akanmu, A; Gao, X; Agee, P and Shojaei, A (2023) Industry perception of the suitability of wearable robot for construction work. Journal of Construction Engineering and Management, 149(5): 04023017, ISSN 0733-9364

Gonsalves, N J; Yusuf, A; Ogunseiju, O and Akanmu, A (2024) Evaluation of concrete workers' interaction with a passive back-support exoskeleton. Engineering, Construction and Architectural Management, 31(11), pp. 4585-4601. ISSN 0969-9988

Gorse, C A; Ellis, R and Hudson-Tyreman, A (2005) Prospective delay analysis and adjudication. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2000) A critical examination of methodologies for studying human communication in the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Goubran, S; Masson, T and Walker, T (2020) Diagnosing the local suitability of high-rise timber construction. Building Research & Information, 48(1), pp. 101-123. ISSN 0961-3218

Goulias, D (1992) Quality assurance and specifications. PhD thesis, University of Texas at Austin, USA.

Grant, E J (2020) Mainstreaming environmental education for architects: The need for basic literacies. Buildings & Cities, 1(1), pp. 538-549. ISSN 2632-6655

Grenzfurtner, W and Gronalt, M (2021) Continuous improvement of the industrialised housebuilding order fulfilment process. Construction Innovation, 21(1), pp. 22-39. ISSN 1471-4175

Griffith, A and Headley, J D (1995) Developing an effective approach to the procurement and management of small building works within large client organizations. Construction Management and Economics, 13(4), pp. 279-289. ISSN 01446193

Griffiths, G (1999) Construction procurement arrangements of housing associations in liverpool. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Gruneberg, S and Fraser, B (2012) Construction purchasing power parities: Potential roles and limitations. Building Research & Information, 40(3), pp. 348-356. ISSN 0961-3218

Gull, I (2011) Testing of strength of recycled waste concrete and its applicability. Journal of Construction Engineering and Management, 137(1), pp. 1-5. ISSN 0733-9364

Gupta, R; Gregg, M and Liu, C (2025) Local area energy mapping approach for high-density heat pump deployment. Buildings & Cities, 6(1), pp. 561-579. ISSN 2632-6655

Hagan, E B (1997) The use of stabilized soil to enhance rural housing. Building Research & Information, 25(4), pp. 210-217. ISSN 0961-3218

Hailemariam, E K; Hailemariam, L M; Amede, E A and Nuramo, D A (2023) Identification of barriers, benefits and opportunities of using bamboo materials for structural purposes. Engineering, Construction and Architectural Management, 30(7), pp. 2716-2738. ISSN 0969-9988

Hammond, D; Dempsey, J J; Szigeti, F and Davis, G (2005) Integrating a performance-based approach into practice: A case study. Building Research & Information, 33(2), pp. 128-141. ISSN 0961-3218

Hamour, O A A R (1978) Project selection and planning in developing countries. PhD thesis, Swansea University, UK.

Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Harisuthan, S; Hasalanka, H; Kularatne, D and Siriwardana, C (2020) Applicability of the PTVA-4 model to evaluate the structural vulnerability of hospitals in Sri Lanka against tsunami. International Journal of Disaster Resilience in the Built Environment, 11(5), pp. 581-596. ISSN 1759-5916

Harrington, S and Mulville, M (2023) The suitability of sensor-based demand controlled ventilation systems in retrofit dwellings: A longitudinal study. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Harrington, S and Mulville, M (2025) Defining demand: The suitability of sensor-based demand-controlled ventilation within deep energy retrofit dwellings. Building Research & Information, 53(5), pp. 656-674. ISSN 0961-3218

Hearne, R (2013) Realising the "right to the city": Developing a human rights based framework for regeneration of areas of urban disadvantage. International Journal of Law in the Built Environment, 5(2), pp. 172-187. ISSN 17561469

Heffernan, E E (2015) Delivering zero carbon homes and sustainable communities: The potential of group self-build housing in England. PhD thesis, University of Plymouth, UK.

Hendy, A O A (2007) An approach to sustainable construction in post-disaster contexts: with specific reference to the Marmara region of Turkey. PhD thesis, Coventry University, UK.

Isiadianso, C (2007) Integrating deconstruction into the project delivery process. PhD thesis, Loughborough University, UK.

Ismail, I A (2014) Financial cash flow determinants of company failure in the construction industry. PhD thesis, University of Michigan, USA.

Jacomit, A M and Granja, A D (2011) An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(2), pp. 113-127. ISSN 1745-2007

Jafarzadeh, R; Wilkinson, S; González, V; Ingham, J M and Amiri, G G (2014) Predicting seismic retrofit construction cost for buildings with framed structures using multilinear regression analysis. Journal of Construction Engineering and Management, 140(3): 4013062, ISSN 0733-9364

Jayanetti, J. K. D. D. T.; Fernando, M. H.; Ranadewa, K. A. T. O. and Perera, B. A. K. S. (2026) Fusion of machine learning to enhance the adaptability of lean construction maturity models (lcmms). Journal of Engineering, Design and Technology, 24(5), pp. 1298-1321. ISSN 1726-0531

Jiang, X; Wang, S; Liu, Y; Xia, B; Skitmore, M; Nepal, M and Ghanbaripour, A N (2023) A method for the ontology-based risk management of PPP construction projects. Construction Innovation, 23(5), pp. 1095-1129. ISSN 1471-4175

Johansson, M (2016) From BIM to VR – the design and development of BIMXplorer. PhD thesis, Chalmers University of Technology, Sweden.

Kam, C W (2000) Quality assurance of construction works in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Kavishe, N and An, M (2016) Challenges for implementing public private partnership in housing projects in dar es salaam city, Tanzania. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Kerali, A G and Thomas, T H (2004) Simple durability test for cement stabilized blocks. Building Research & Information, 32(2), pp. 140-145. ISSN 0961-3218

Khadour, L (2010) Total quality environmental management framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Khadour, Lina (2010) Total quality environmental management (tqem) framework towards sustainability (UK novated D&B principal contractors). PhD thesis, Nottingham Trent University, UK.

Kim, J H and Fisher, N (2001) Knowledge management for small occasional construction industry clients: A theoretical framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Kim, J L (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics, 31(1), pp. 3-19. ISSN 1466433X

Kim, S (1997) Organization and managerial environment of the Korean construction industry. Construction Management and Economics, 15(5), pp. 409-419. ISSN 01446193

Kpamma, Z E; Adjei-Kumi, T; Ayarkwa, J and Adinyira, E (2016) An exploration of the choosing by advantages decision system as a user engagement tool in participatory design. Architectural Engineering and Design Management, 12(1), pp. 51-66. ISSN 1745-2007

Krishnaraj, L; Kumar, V R P; Balasubramanian, M; Kumar, N and Shyamala, T (2022) Futuristic evaluation of building energy simulation model with comparison of conventional villas. International Journal of Construction Management, 22(1), pp. 31-40. ISSN 1562-3599

La, Anh Tuan (2016) Principal factors for public-private partnership (ppp) implementation in Vietnam: A mixed methods study. PhD thesis, University of Technology Sydney, Australia.

Laitos, J G and Abel, T M (2013) Sites suitable for mixed use development in Britain and America. International Journal of Law in the Built Environment, 5(2), pp. 137-155. ISSN 17561469

Lan, O B; Ling, F Y Y and Soo, A (2014) Information feedback and bidders' competitiveness in construction bidding. Engineering, Construction and Architectural Management, 21(5), pp. 571-585. ISSN 0969-9988

Larcher, P A (2000) A model for a contractor support agency. PhD thesis, Loughborough University, UK.

Lasebikan, B A; Akisanya, A R and Deans, W F (2015) Autoclave design for high pressure-high temperature corrosion studies. Journal of Engineering, Design and Technology, 13(4), pp. 539-555.

Lim, B; Nepal, M P; Skitmore, M and Xiong, B (2016) Drivers of the accuracy of developers' early stage cost estimates in residential construction. Journal of Financial Management of Property and Construction, 21(1), pp. 4-20. ISSN 1366-4387

Lin, Tong (2025) Offsite construction in the Australian low-rise residential buildings: Application levels and procurement options. PhD thesis, RMIT University, Australia.

Lin, Y H; Lee, P C and Chang, T P (2008) Integrating grey number and minkowski distance function into grey relational analysis technique to improve the decision quality under uncertain information. Construction Management and Economics, 26(2), pp. 115-123. ISSN 1466433X

Lingard, H.; Cooke, T. and Gharaie, E. (2013) A case study analysis of fatal incidents involving excavators in the Australian construction industry. Engineering, Construction and Architectural Management, 20(5), pp. 488-504. ISSN 0969-9988

Lopez, R and Amara, A (2018) Comparison of dispute boards and statutory adjudication in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 70-78. ISSN 17514304

Lulyalya, L P; Kikwasi, G J and Sospeter, N G (2026) Adequacy of contractor's financial capability weighing criteria in Tanzania construction projects: A quadratic and gap analysis. Journal of Engineering, Design and Technology, 24(1), pp. 24-44. ISSN 1726-0531

Luu, D and Sher, W (2006) Construction tender subcontract selection using case-based reasoning. Construction Economics and Building, 6(2), pp. 32-43. ISSN 2204-9029

Luu, D T; Ng, S T and Chen, S E (2003) Parameters governing the selection of procurement system - An empirical survey. Engineering, Construction and Architectural Management, 10(3), pp. 209-218. ISSN 0969-9988

Lützkendorf, T (2018) Assessing the environmental performance of buildings: Trends, lessons and tensions. Building Research & Information, 46(5), pp. 594-614. ISSN 0961-3218

MacArulla, M; Forcada, N; Casals, M; Gangolells, M; Fuertes, A and Roca, X (2013) Standardizing housing defects: Classification, validation, and benefits. Journal of Construction Engineering and Management, 139(8), pp. 968-976. ISSN 0733-9364

Madhubhashana, H S A; Perera, B A K S and Perera, C S R (2019) Post-tensioned concreting: its suitability for and acceptability in Sri Lanka. Journal of Engineering, Design and Technology, 17(4), pp. 719-735. ISSN 1726-0531

Mahamadu, A M; Mahdjoubi, L; Booth, C; Manu, P and Manu, E (2019) Building information modelling (BIM) capability and delivery success on construction projects. Construction Innovation, 19(2), pp. 170-192. ISSN 1471-4175

Mahamadu, A-M (2017) Development of a decision support framework to aid selection of construction supply chain organisations for BIM-enabled projects. PhD thesis, University of the West of England, Bristol, UK.

Mahdi, I M; Arafat, H; Ebid, A M and El-Kadi, A F (2023) Decision model to identify the optimum retaining wall type for restricted highway projects sites. International Journal of Construction Management, 23(8), pp. 1387-1394. ISSN 1562-3599

Manoliadis, O G; Pantouvakis, J P and Christodoulou, S (2009) Improving qualifications-based selection by use of the fuzzy Delphi method. Construction Management and Economics, 27(4), pp. 373-384. ISSN 1466433X

Manthe, M and Smallwood, J (2007) The appropriateness of built environment tertiary education: Perspectives of academics and postgraduate students. Journal of Engineering, Design and Technology, 5(2), pp. 102-119. ISSN 1726-0531

Maroof, A O; Said, I and Ismail, R (2016) Factors affecting building security cost sustainability using PCA. Journal of Financial Management of Property and Construction, 21(1), pp. 21-38. ISSN 1366-4387

Martin, L and Hartmann, A (2010) Understanding knowledge creation in construction: Activity theory as an alternative approach. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Masitenyane, L A (2020) Dimensions and outcomes of buyer-seller relationship intentions for concrete products in the construction environment. DTech thesis, Vaal University of Technology, South Africa.

Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.

Mbachu, J (2008) Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26(5), pp. 471-484. ISSN 1466433X

McKim, R; Hegazy, T and Attalla, M (2000) Project performance control in reconstruction projects. Journal of Construction Engineering and Management, 126(2), pp. 137-141. ISSN 0733-9364

Mengistu, D G; Beyene, M M and Wudineh, T A (2024) Public procurement practice to enhance technology and innovation development in Ethiopian construction industry. International Journal of Construction Management, 24(10), pp. 1145-1154. ISSN 1562-3599

Mills, G R W; Phiri, M; Erskine, J and Price, A D F (2015) Rethinking healthcare building design quality: An evidence-based strategy. Building Research & Information, 43(4), pp. 499-515. ISSN 0961-3218

Mohandes, S R (2020) Towards improvements to the occupational health and safety in construction industry. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Moharrami, S; Taghaddos, M; RazaviAlavi, S R and AbouRizk, S (2021) A hybrid simulation approach for microtunneling construction planning. Construction Innovation, 21(3), pp. 363-378. ISSN 1471-4175

Mohjah Mohammed, A; Al-Naim, M and El-Wakeel, H (2024) Developing a tool to assess the performance of educational built environments for students with multiple sclerosis. Architectural Engineering and Design Management, 20(3), pp. 494-509. ISSN 1745-2007

Mojahed, S (2005) A project improvement system for effective management of construction projects. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Morales-Beltran, M and Yildiz, B (2020) Integrating configuration-based seismic design principles into architectural education: Teaching strategies for lecture courses. Architectural Engineering and Design Management, 16(4), pp. 310-328. ISSN 1745-2007

Mostafa, S; Tam, V W; Dumrak, J and Mohamed, S (2020) Leagile strategies for optimizing the delivery of prefabricated house building projects. International Journal of Construction Management, 20(8), pp. 867-881. ISSN 1562-3599

Motaleb, O H (2014) Development of a risk response model to handle delays of construction projects in the United Arab Emirates. PhD thesis, Robert Gordon University, UK.

Moylan, W A (2005) Building ethics in construction partnerships: An analysis of values-based leadership. PhD thesis, Capella University, USA.

Muhammed-Yakubu, N (2023) A BIM-based information management schema for construction activities data-flow across the project life cycle. PhD thesis, University of the West of England, Bristol, UK.

Muleya, F; Mulenga, B; Zulu, S L; Nwaubani, S; Tembo, C K and Mushota, H (2021) Investigating the suitability and cost-benefit of copper tailings as partial replacement of sand in concrete in Zambia: An exploratory study. Journal of Engineering, Design and Technology, 19(4), pp. 828-849. ISSN 1726-0531

Mungodla, S G; Linganiso, L Z; Mlambo, S and Motaung, T (2019) Economic and technical feasibility studies: Technologies for second generation biofuels. Journal of Engineering, Design and Technology, 17(4), pp. 670-704. ISSN 1726-0531

Mustaffa, N E and Bowles, G (2004) Dispute avoidance mechanism in partnering arrangements. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Muthukumaran, V; Kumar, M S and Selladurai, V (2013) Improvement of surface properties of AISI 316lL SS by oxygen and helium ion implantation. Journal of Engineering, Design and Technology, 11(1), pp. 34-43. ISSN 1726-0531

Nair, S G; Nguyen, Q D; Zhu, Q; Karimi, M; Gan, Y; Wang, X; Castel, A; Irga, P; da Rocha, C G d; Torpy, F; Wilkinson, S; Moreau, D and Delhomme, F (2025) Suitability of calcined clay and ground granulated blast furnace slag geopolymer binder for hempcrete applications. Built Environment Project and Asset Management, 15(5), pp. 924-936. ISSN 2044-124X

Nasrabadi, M T and Hataminejad, H (2019) Assessing sustainable housing indicators: A structural equation modeling analysis. Smart and Sustainable Built Environment, 8(5), pp. 457-472. ISSN 2046-6099

Nicol, L A and Knoepfel, P (2014) Resilient housing: A new resource-oriented approach. Building Research & Information, 42(2), pp. 229-239. ISSN 0961-3218

Niskanen, T and Lauttalammi, J (1989) Accident prevention in materials handling at building construction sites. Construction Management and Economics, 7(3), pp. 263-279. ISSN 01446193

Noor, Muhammad Ali (2012) Investigating the role of procurement practices in effective implementation of infrastructure projects in a developing country: A case of Pakistan. PhD thesis, RMIT University, Australia.

Noorzai, E (2023) Evaluating lean techniques to improve success factors in the construction phase. Construction Innovation, 23(3), pp. 622-639. ISSN 1471-4175

Obeng, K; Ocran, K A G and Anaba, D (1997) Palm kernel shell as fuel for burning bricks. Building Research & Information, 25(3), pp. 131-136. ISSN 0961-3218

Obike, O; Soetanto, R and Sohail, M (2025) A risk management model for integrating resilience into renewable energy projects. Construction Management and Economics, 43(7), pp. 537-555. ISSN 0144-6193

Ofori-Boadu, A N; Bryant, D; Bock-Hyeng, C; Assefa, Z; Aryeetey, F; Munkaila, S and Fini, E (2022) Physiochemical characterization of agricultural waste biochars for partial cement replacement. International Journal of Building Pathology and Adaptation, 40(4), pp. 569-586. ISSN 23984708

Ogunseiju, O; Olayiwola, J; Akanmu, A and Olatunji, O A (2022) Evaluation of postural-assist exoskeleton for manual material handling. Engineering, Construction and Architectural Management, 29(3), pp. 1358-1375. ISSN 0969-9988

Ogunsemi, D R and Aje, I O (2006) A model for contractors' selection in Nigeria. Journal of Financial Management of Property and Construction, 11(1), pp. 33-44. ISSN 1366-4387

Oke, A. E.; Adekunye, O. J.; Adeosun, F. E.; Aliu, J.; Akanni, P. O.; Aghimien, D. and Aigbavboa, C. O. (2026) Assessment of the challenges of integrating cyber-physical systems in Nigerian construction. Engineering, Construction and Architectural Management, 33(4), pp. 3146-3163. ISSN 0969-9988

Olabanji, O M and Mpofu, K (2020) Adopting hybridized multicriteria decision model as a decision tool in engineering design. Journal of Engineering, Design and Technology, 18(2), pp. 451-479. ISSN 1726-0531

Olawumi, T O and Chan, D W M (2021) Green-building information modelling (green-BIM) assessment framework for evaluating sustainability performance of building projects: A case of Nigeria. Architectural Engineering and Design Management, 17(5-6), pp. 458-477. ISSN 1745-2007

Oliver, M (2013) Evaluation of the planning and implementation of NHS Local Improvement Finance Trust (LIFT) in East London. PhD thesis, University of East London, UK.

Osundiran, Adeola Oluwatoyin and Makgopa, Tshehla (2026) Port efficiency: The application of blockchain technology in the construction material supply chain. Journal of Construction Business and Management, 8(S1), pp. 48-61. ISSN 2521-0165

Oti-Sarpong, K (2019) Examining international technology transfer on construction projects in developing countries through a social construction of technology lens. PhD thesis, University of Hong Kong, Hong Kong.

Owolabi, A (2004) Development of an integrated product information management system. EngD thesis, Loughborough University, UK.

Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2024) Development of Adapt-ABLE smart system: An end-to-end system for speeding up disabled housing adaptation process. International Journal of Building Pathology and Adaptation, 42(4), pp. 531-552. ISSN 23984708

Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2025) Smart housing adaptations register with user matching functionalities for different mobility categories for the social housing sector. International Journal of Building Pathology and Adaptation, 43(2), pp. 177-196. ISSN 2398-4708

Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2025) Development of a smart home suitability indicator and indicative self-assessment platform for the disabled facilities grants (dfgs). International Journal of Building Pathology and Adaptation, 43(2), pp. 139-158. ISSN 2398-4708

Oztemir, A E (2003) Skill-driven optimization of construction operations. PhD thesis, Arizona State University, USA.

Pantzartzis, E; Price, A and Edum Fotwe, F (2019) Roadmap layers and processes: Resilient and sustainable care facilities. Engineering, Construction and Architectural Management, 26(9), pp. 1986-2007. ISSN 0969-9988

Paul, V K and Seth, V (2017) Benchmarking and objective selection of technologies for housing in India using quality function deployment. Journal of Construction in Developing Countries, 22(S1), pp. 63-78. ISSN 1823-6499

Peltokorpi, A; Olivieri, H; Granja, A D and Seppänen, O (2018) Categorizing modularization strategies to achieve various objectives of building investments. Construction Management and Economics, 36(1), pp. 32-48. ISSN 01446193

Perera, U S; Siriwardana, C and Pitigala Liyana Arachchi, I S (2024) Development of critical infrastructure resilience index for cities in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 193-211. ISSN 1759-5916

Powell, A; Dainty, A and Bagilhole, B (2010) Achieving gender equality in the construction professions: Lessons from the career decisions of women construction students in the UK. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Raftery, J J (1984) An investigation of the suitability of cost models for use in building design. PhD thesis, Liverpool Polytechnic, UK.

Rahi, K; Abu Baker, F; Preece, C and Abu Jadayil, W (2025) Scale to measure project resilience for the construction sector to cope with hazards. International Journal of Disaster Resilience in the Built Environment, 16(2), pp. 242-259. ISSN 1759-5908

Ramanayaka, C D D (2013) Developing a strategy-led approach as a suitable methodology for construction project planning and implementation. PhD thesis, Auckland University of Technology, New Zealand.

Ramani, P V; Selvaraj, P; T., S and Gupta, A (2022) Application of linear scheduling in water canal construction with a comparison of critical path method. Journal of Construction in Developing Countries, 27(1), pp. 189-212. ISSN 1823-6499

Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(2), pp. 253-267. ISSN 1562-3599

Raoufi, M and Fayek, A R (2021) Hybrid fuzzy Monte Carlo agent-based modeling of workforce motivation and performance in construction. Construction Innovation, 21(3), pp. 398-416. ISSN 1471-4175

Rashed, Y; Omrani, S; Nilsson, D and Drogemuller, R (2024) Sustainability promotion through information provision: the perspective of Australian apartment owners and renters. Building Research & Information, 52(8), pp. 923-940. ISSN 0961-3218

Raslan, R and Davies, M (2012) Legislating building energy performance: Putting EU policy into practice. Building Research & Information, 40(3), pp. 305-316. ISSN 0961-3218

Reynoso Vanderhorst, H D; Heesom, D; Suresh, S; Renukappa, S and Burnham, K (2023) Barriers and cost model of implementing unmanned aerial system (uas) services in a decentralised system: Case of the Dominican Republic. Construction Innovation, 23(4), pp. 833-857. ISSN 1471-4175

Rosayuru, H D R R; Waidyasekara, K G A S and Wijewickrama, M K C S (2022) Sustainable BIM based integrated project delivery system for construction industry in Sri Lanka. International Journal of Construction Management, 22(5), pp. 769-783. ISSN 1562-3599

Rosli, M F; Muhammad Tamyez, P F and Zahari, A R (2023) The effects of suitability and acceptability of lean principles in the flow of waste management on construction project performance. International Journal of Construction Management, 23(1), pp. 114-125. ISSN 1562-3599

Russell, J S (1992) Decision models for analysis and evaluation of construction contractors. Construction Management and Economics, 10(3), pp. 185-202. ISSN 01446193

Salagoor, J Y (1990) The influence of building regulations on urban dwelling in Jeddah. PhD thesis, University of Newcastle upon Tyne, UK.

Salamati, A A (2001) Urban housing design in Iran in response to socio-cultural and environmental conditions. PhD thesis, University of Strathclyde, UK.

Salameh, M; Touqan, B and Suliman, A (2024) Enhancing student satisfaction and academic performance through school courtyard design: A quantitative analysis. Architectural Engineering and Design Management, 20(4), pp. 911-927. ISSN 1745-2007

Samaraweera, A; Senaratne, S and Sandanayake, Y G (2018) Methodology to extract underlying basic assumptions of a public sector construction project culture: An exploratory case study. International Journal of Construction Management, 18(6), pp. 467-481. ISSN 1562-3599

Sarireh, M (2022) Examining the suitability of Tripoli as admixture in cement paste. International Journal of Construction Management, 22(16), pp. 3169-3174. ISSN 1562-3599

Scott, D; Kwan Wah Cheong, M; Assistant, R and Li, H (2003) Web-based construction information management system. Construction Economics and Building, 3(1), pp. 43-52. ISSN 2204-9029

Scott, L and Fortune, C (2010) Reshaping assessment practices in built environment undergraduate programmes: What heads of department report. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(2),

Shahin, A A (2007) A framework for cold weather construction simulation. PhD thesis, University of Alberta, Canada.

Shaw, C; de Andrade Pereira, F; Farghaly, K; Hoare, C; Hartmann, T and O'Donnell, J (2024) Life cycle cost analysis at scale: a reference architecture-based approach. Built Environment Project and Asset Management, 14(5), pp. 713-733. ISSN 2044-124X

Shen, Q; Wang, H and Tang, B S (2014) A decision-making framework for sustainable land use in Hong Kong's urban renewal projects. Smart and Sustainable Built Environment, 3(1), pp. 35-53. ISSN 2046-6099

Sherif, E and Kaka, A (2003) Factors influencing the selection of payment systems in construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Sherif, E h and Kaka, A (2004) A multi criteria mode for the selection of the payments systems in construction projects. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Shin, D H (2007) Strategic development of AR systems for industrial construction. PhD thesis, Purdue University, USA.

Silverio Rodriguez, A K (2020) Implementation of building information modelling in the Dominican Republic construction industry. PhD thesis, University of Wolverhampton, UK.

Singh, V and Holmström, J (2015) Needs and technology adoption: Observation from BIM experience. Engineering, Construction and Architectural Management, 22(2), pp. 128-150. ISSN 0969-9988

Skitmore, R M (1986) A model of the construction project selection and bidding decision. PhD thesis, University of Salford, UK.

Smallwood, J J and Haupt, T C (2009) Construction ergonomics: Perspectives of female and male production workers. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Stewart, J; Minchin, R E; Jaselskis, E J; Dayal, V and Smith, G (2004) Potential construction applications for thermoset composite scrap material. Journal of Construction Engineering and Management, 130(2), pp. 199-205. ISSN 0733-9364

Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: A case study. Construction Management and Economics, 24(4), pp. 339-348. ISSN 01446193

Stoy, C and Kalusche, W (2006) The determination of occupancy costs during early project phases. Construction Management and Economics, 24(9), pp. 933-944. ISSN 1466433X

Swaffield, L M and Pasquire, C L (1996) A critique of mechanical and electrical services cost planning: Existing methods and published information. Journal of Financial Management of Property and Construction, 1(3), pp. 23-42. ISSN 1366-4387

Tam, V W Y; Fung, I W H; Jorge Evangelista, A C J and Wong, S W L (2025) Assistant robotic machine for Hong Kong construction industry. International Journal of Construction Management, 25(14), pp. 1749-1754. ISSN 1562-3599

Tam, V W Y and Le, K N (2008) On using the Gaussian and hyperbolic distributions to improve quality in construction. Journal of Engineering, Design and Technology, 6(2), pp. 112-123. ISSN 1726-0531

Tan, L; Zhang, Y; Chen, Y and Zhu, T (2023) A multiple-objective decision-support model for lighting maintenance routing considering carbon dioxide emissions and balanced workload. Journal of Construction Engineering and Management, 149(8): 04023063, ISSN 0733-9364

Tanko, B L; Abdullah, F; Mohamad Ramly, Z and Enegbuma, W I (2018) An implementation framework of value management in the Nigerian construction industry. Built Environment Project and Asset Management, 8(3), pp. 305-319. ISSN 2044-124X

Taylor, R G and Bowen, P A (1987) Building price-level forecasting: An examination of techniques and applications. Construction Management and Economics, 5(1), pp. 21-44. ISSN 01446193

Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Thompson, N E (2005) Business excellence: lessons for the construction industry. PhD thesis, Loughborough University, UK.

Thurairajah, N; Amaratunga, R D G and Haigh, R (2007) Study on women leadership in construction organisations. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects. PhD thesis, University of California, Berkeley, USA.

Tyvand, J and Blachly, A T (1986) Foamed plastic absorbs staged post-tensioning deflections. Journal of Construction Engineering and Management, 112(4), pp. 582-587. ISSN 0733-9364

Vatankhah, M; Vakilinezhad, R; Zakeri, S M H and Fattahi, K (2024) Optimizing energy and daylight performance of vernacular dwellings for contemporary architecture: A parametric analysis. Architectural Engineering and Design Management, 20(6), pp. 1795-1814. ISSN 1745-2007

Volpintesta, Francesco (2024) New eco-sustainable construction materials derived from industrial wastes. PhD thesis, Università degli Studi di Camerino, Italy.

Wall, D M (1997) Distributions and correlations in Monte Carlo simulation. Construction Management and Economics, 15(3), pp. 241-258. ISSN 01446193

Wang, L; Huang, R and Li, X (2025) Research on technical suitability analysis and scheme selection of prefabricated buildings in China. Engineering, Construction and Architectural Management, 32(8), pp. 4969-4990. ISSN 0969-9988

Ward, P (2005) The socl's delay and disruption protocol and the Australian construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ward, P (2011) A UK and Australian perspective of the suitability of the scl protocols' provisions for dealing with float for adoption and use by the Australian construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Watson, S (2004) Improving the implementation of environmental strategies in the design of buildings: Towards a life-cycle based, front loaded, framework for building environmental assessment during design. PhD thesis, University of Queensland, Australia.

Wefki, H; Salah, M; Elbeltagi, E; Elsheikh, A and Khallaf, R (2025) A generative design-based optimization model for multi-objective construction site layout planning. Engineering, Construction and Architectural Management, 32(8), pp. 5429-5455. ISSN 0969-9988

Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.

Willar, D; Trigunarsyah, B and Coffey, V (2016) Organisational culture and quality management system implementation in Indonesian construction companies. Engineering, Construction and Architectural Management, 23(2), pp. 114-133. ISSN 0969-9988

Windapo, A O; Olugboyega, O and Odediran, S (2020) Impacts of procurement strategies on construction SMEs' growth. Journal of Financial Management of Property and Construction, 25(3), pp. 423-446. ISSN 1366-4387

Wong, C H; Nicholas, J and Holt, G D (2003) Using multivariate techniques for developing contractor classification models. Engineering, Construction and Architectural Management, 10(2), pp. 99-116. ISSN 0969-9988

Wong, J and Gray, J (2010) A discussion of the research performance evaluation in building and construction management discipline: The journal impact factors (jif) and 'sci-index journals'. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Wong, Kwok Tung Thomas (2006) Strategies for environmental sustainability in Hong Kong's construction industry. PhD thesis, University of South Australia, Australia.

Wong, M K (2006) A study of capacity predictions for driven piles by dynamic pile testing. PhD thesis, University of Hong Kong, Hong Kong.

Wu, D; Chan, E H W and Shen, L (2004) Scoring system for measuring contractor's environmental performance. Journal of Construction Research, 5(1), pp. 139-147. ISSN 1609-9451

Wuni, I Y and Mazher, K M (2024) Ending the suitability quantification dilemma: Intelligent decision support system for modular integrated construction in a high-density metropolis. Construction Innovation, 24(4), pp. 1026-1047. ISSN 1471-4175

Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333. ISSN 0969-9988

Wuni, I Y; Shen, G Q; Ogungbile, A J and Ayitey, J Z (2022) Four-pronged decision support framework for implementing industrialized construction projects. Construction Innovation, 22(2), pp. 263-283. ISSN 1471-4175

Yin, X (2018) Development of straw bale building in northern China. PhD thesis, University of Bath, UK.

Yoon, S; Hastak, M and Lee, J (2018) Suitability of intelligent compaction for asphalt pavement quality control and quality assurance. Journal of Construction Engineering and Management, 144(4): 04018006, ISSN 0733-9364

Yu, Y; Zhao, B; Yu, J; Xu, Y; Chang, W S; Chen, Y and Guo, H (2025) Study of phase change material on alleviating building overheating risk in cold regions of China. Building Research & Information, 53(1-2), pp. 183-203. ISSN 0961-3218

Zhao, J (2020) Towards a proactive real-time data-driven musculoskeletal disorders prevention approach in construction. PhD thesis, Pennsylvania State University, USA.

Zhuang, J; Wang, Y; Yan, Z and Liu, J (2026) Evolutionary game analysis on the cooperative mechanism of government subsidies and market-based risk mitigation institutions in managing ecosustainable projects' default risks. Journal of Construction Engineering and Management, 152(3): 04025270, ISSN 0733-9364

van den Berg, J; Appel-Meulenbroek, R; Kemperman, A and Sotthewes, M (2020) Knowledge workers' stated preferences for important characteristics of activity-based workspaces. Building Research & Information, 48(7), pp. 703-718. ISSN 0961-3218

This list was generated on Sat Aug 22 02:32:29 2026 UTC.