Items with Subject: delivery method
Adamtey, S (2021) Cost and time performance analysis of progressive design-build projects. Journal of Engineering, Design and Technology, 19(3), pp. 686-697. ISSN 1726-0531
Adamtey, S A (2021) A case study performance analysis of design-build and integrated project delivery methods. International Journal of Construction Education and Research, 17(1), pp. 68-84. ISSN 1557-8771
Agbaxode, P D K (2022) A framework to improve design documentation quality using integrated project delivery (IPD) approach. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Agbaxode, P D K; Saghatforoush, E and Dlamini, S (2025) Capabilities required of the conventional project delivery (CPD) approach in producing quality design documentation: The Ghanaian construction industry perspective. Journal of Engineering, Design and Technology, 23(2), pp. 682-701. ISSN 1726-0531
Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.
Alameri, R and Esmaeili, B (2023) Progressive design-build delivery method: Assessment of project performance. International Journal of Construction Education and Research, 19(1), pp. 22-41. ISSN 1557-8771
Aldossari, K M; Lines, B C; Smithwick, J B; Hurtado, K C and Sullivan, K T (2023) Alternative project delivery method adoption in the AEC industry: An organizational change perspective. International Journal of Construction Education and Research, 19(2), pp. 150-165. ISSN 1557-8771
Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.
Alzara, M (2016) Measuring the construction performance in Saudi Arabia and proposing new procurement model based on BV PIPS (a university case study). PhD thesis, Arizona State University, USA.
Amoah, C and Le Roux, L (2025) Students' challenges with online remote teaching and learning in South Africa. International Journal of Construction Education and Research, 21(4), pp. 533-553. ISSN 1557-8771
Andary, E G; Abi Shdid, C; Chowdhury, A and Ahmad, I (2020) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(3), pp. 609-633. ISSN 0969-9988
Annunen, P and Haapasalo, H (2022) Production capability creation (PCC) for collaborative construction projects: A qualitative study from Finland. Construction Economics and Building, 22(3), pp. 1-20. ISSN 2204-9029
Antoine, A L C (2017) Performance-based project delivery selection for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Assaad, R H; Jezzini, Y and Assaf, G (2026) Proposing and exploring integrated trade delivery as a new project delivery method: Assessing the drivers and barriers to its implementation in construction projects. Journal of Construction Engineering and Management, 152(1): 04025215, ISSN 0733-9364
Azhar, N (2014) Integrated construction project delivery system in the U.S. Public sector: An information modeling framework. PhD thesis, Florida International University, USA.
Barlow, P L and Leed, A P (2011) Development and delivery of an integrated project-based jobsite management undergraduate course. International Journal of Construction Education and Research, 7(1), pp. 3-21. ISSN 1557-8771
Barutha, P J (2018) Integrated project delivery for industrial projects. PhD thesis, Iowa State University, USA.
Bauer, E and Menches, C L (2011) Why we need renaissance engineers: Golden Gate bridge seismic retrofit Phase II case study. Journal of Construction Engineering and Management, 137(10), pp. 901-905. ISSN 0733-9364
Bilbo, D; Bigelow, B; Escamilla, E and Lockwood, C (2015) Comparison of construction manager at risk and integrated project delivery performance on healthcare projects: A comparative case study. International Journal of Construction Education and Research, 11(1), pp. 40-53. ISSN 1557-8771
Bilec, M M (2007) A hybrid life cycle assessment model for construction processes. PhD thesis, University of Pittsburgh, USA.
Bingham, E (2014) Analysis of the state of practice and best practices for alternative project delivery methods in the transportation design and construction industry. PhD thesis, Arizona State University, USA.
Bingham, E; Edward Gibson, G and El Asmar, M (2019) Identifying team selection and alignment factors by delivery method for transportation projects. Journal of Construction Engineering and Management, 145(10): 04019061, ISSN 0733-9364
Bingham, E; Gibson, G E and Asmar, M E (2018) Measuring user perceptions of popular transportation project delivery methods using least significant difference intervals and multiple range tests. Journal of Construction Engineering and Management, 144(6): 04018033, ISSN 0733-9364
Bo, X and Chan, A P C (2012) Investigation of barriers to entry into the design-build market in the people's republic of China. Journal of Construction Engineering and Management, 138(1), pp. 120-127. ISSN 0733-9364
Brennan, M D (2011) Integrated project delivery: A normative model for value creation in complex military medical projects. PhD thesis, University of Illinois, USA.
Bypaneni, S P K (2017) A Bayesian network-based decision framework for selecting project delivery methods in highway construction. PhD thesis, University of Kansas, USA.
Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.
Carpenter, N and Bausman, D C (2016) Project delivery method performance for public school construction: Design-bid-build versus CM at risk. Journal of Construction Engineering and Management, 142(10): 05016009, ISSN 0733-9364
Carpenter, W J (2004) Design and construction in architectural education: 1963-2003. PhD thesis, Birmingham City University, UK.
Celoza, Amelia McLean (2022) The impact of contractual and legal factors on information management in AEC project delivery. PhD thesis, University of Texas at Austin, USA.
Chang, K (2004) Multiattribute weighting models for best-value selection in public sector design-build projects. PhD thesis, University of Colorado at Boulder, USA.
Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: A comparative perspective. Construction Management and Economics, 23(9), pp. 913-925. ISSN 01446193
Chen, Q; Jin, Z; Xia, B; Wu, P and Skitmore, M (2016) Time and cost performance of design-build projects. Journal of Construction Engineering and Management, 142(2): 04015074, ISSN 0733-9364
Chi, C S F and Javernick-Will, A N (2011) Institutional effects on project arrangement: High-speed rail projects in China and Taiwan. Construction Management and Economics, 29(6), pp. 595-611. ISSN 1466433X
Cole, B K (2012) Building social infrastructure through public-private partnerships: The case of student housing in public higher education. PhD thesis, Clemson University, USA.
DarConte, F X (2017) Best value alignment process for public works construction in New York state. PhD thesis, Polytechnic Institute of New York University, USA.
Demetracopoulou, V; O'Brien, W J; Khwaja, N; Feghaly, J and El Asmar, M (2024) A critical review and analysis of decision-support processes and tools for project delivery method selection. Engineering, Construction and Architectural Management, 31(1), pp. 487-505. ISSN 0969-9988
Dogan, Y O; Arditi, D and Irlayıcı Cakmak, P (2026) Corporate universities in building construction companies: Evidence from the u.S. International Journal of Construction Education and Research, 22(1), pp. 96-118. ISSN 1557-8771
Eiris, R (2020) iVisit: Using 360-degree interactive digital sites to practice problem-solving and collaboration within complex spatiotemporal contexts. PhD thesis, University of Florida, USA.
El Asmar, M; Hanna, A S and Loh, W Y (2013) Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11): 4013012, ISSN 0733-9364
El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(4), pp. 385-398. ISSN 1466433X
Elgamal, S; Ayer, S and Parrish, K (2025) A review of VR in undergraduate construction education and training: Unveiling the opportunities to address content areas from ACCE's student learning outcomes (SLOs). International Journal of Construction Education and Research, 21(3), pp. 408-432. ISSN 1557-8771
Ellis, R C T (2001) Lessons in project management. PhD thesis, Loughborough University, UK.
Enache-Pommer, E (2010) A synergistic approach to green building delivery, lean principles and building information modeling in the design of healthcare facilities. PhD thesis, Pennsylvania State University, USA.
Engebø, A; Klakegg, O J; Lohne, J; Bohne, R A; Fyhn, H and Lædre, O (2022) High-performance building projects: How to build trust in the team. Architectural Engineering and Design Management, 18(6), pp. 774-790. ISSN 1745-2007
Farrow, C B (2016) Problem-solving styles in the Southeast construction industry. EdD thesis, Auburn University, USA.
Farrow, C B; Liu, J and Tatum, M C (2011) Curriculum delivery and assessment for net generation construction students. International Journal of Construction Education and Research, 7(2), pp. 109-125. ISSN 1557-8771
Fathi, M (2020) Public-private partnership contract framework development and project performance analysis compared to design-build in the US highway projects. PhD thesis, University of Nevada, Las Vegas, USA.
Fathi, M and Shrestha, P P (2022) Public-private partnership project performance analysis compared to design-build in highway projects. Journal of Construction Engineering and Management, 148(11): 04022118, ISSN 0733-9364
Feghaly, J (2020) Innovative delivery of water infrastructure projects. PhD thesis, Arizona State University, USA.
Feghaly, J; El Asmar, M; Ariaratnam, S and Bearup, W (2020) Selecting project delivery methods for water treatment plants. Engineering, Construction and Architectural Management, 27(4), pp. 936-951. ISSN 0969-9988
Fernandes, D A; Costa, A A and Lahdenperä, P (2018) Key features of a project alliance and their impact on the success of an apartment renovation: A case study. International Journal of Construction Management, 18(6), pp. 482-496. ISSN 1562-3599
Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments. PhD thesis, Columbia University, USA.
Fitch, G J; Odeh, I and William Ibbs, C (2015) Economic sustainability of dbo water based on wastewater projects in the U.S.: Three case studies. Journal of Construction Engineering and Management, 141(5): 05015001, ISSN 0733-9364
Francis, A (2017) Simulating uncertainties in construction projects with chronographical scheduling logic. Journal of Construction Engineering and Management, 143(1): 04016085, ISSN 0733-9364
Francom, T C (2015) Performance of the construction manager at risk (CMAR) delivery method applied to pipeline construction projects. PhD thesis, Arizona State University, USA.
Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364
Fullen, M D (2009) The development, diffusion and evaluation of a fall hazard safety training program for residential construction workers utilizing instructor led and new media delivery. EdD thesis, West Virginia University, USA.
Ghosh, S and Robson, K F (2015) Analyzing the empire state building project from the perspective of lean delivery system: A descriptive case study. International Journal of Construction Education and Research, 11(4), pp. 257-267. ISSN 1557-8771
Gransberg, D D and Molenaar, K (2003) A synthesis of design-builder selection methods for public infrastructure projects. Journal of Construction Procurement, 9(2), pp. 40-51. ISSN 1358-9180
Guo, S (2025) Optimizing profit distribution in IPD projects: A fuzzy cooperative game approach to address resource-based input uncertainty. Journal of Construction Engineering and Management, 151(9): 04025118, ISSN 0733-9364
Guo, S; Wang, J and Wu, H (2021) Profit distribution of IPD projects using fuzzy alliance. Engineering, Construction and Architectural Management, 28(8), pp. 2069-2089. ISSN 0969-9988
Gurdo, H (2016) Non-traditional construction management technology students: Overcoming barriers to degree completion. EdD thesis, Wilmington University (Delaware), USA.
Hale, D R; Shrestha, P P; Gibson, G E and Migliaccio, G C (2009) Empirical comparison of design/build and design/bid/build project delivery methods. Journal of Construction Engineering and Management, 135(7), pp. 579-587. ISSN 0733-9364
Hamzeh, F; Rached, F; Hraoui, Y; Karam, A J; Malaeb, Z; El Asmar, M and Abbas, Y (2019) Integrated project delivery as an enabler for collaboration: A middle East perspective. Built Environment Project and Asset Management, 9(3), pp. 334-347. ISSN 2044-124X
Han, F (2021) Measurement of resilience performance for infrastructure construction project delivery. PhD thesis, University of New Mexico, USA.
Hanna, A S (2016) Benchmark performance metrics for integrated project delivery. Journal of Construction Engineering and Management, 142(9): 04016040, ISSN 0733-9364
Harper, C M (2014) Measuring project integration using relational contract theory. PhD thesis, University of Colorado at Boulder, USA.
Hashem M. Mehany, M S; Killingsworth, J and Shah, S (2021) An evaluation of training delivery methods’ effects on construction safety training and knowledge retention - a foundational study. International Journal of Construction Education and Research, 17(1), pp. 18-36. ISSN 1557-8771
Hillestad, D (2022) Building owners and managers organizational maturity self-assessment for a facility condition assessment program. PhD thesis, Arizona State University, USA.
Hosseinian, Seyedmahdi (2013) Optimal outcome sharing arrangements in construction target contracts. PhD thesis, University of New South Wales, Australia.
Hyun, C; Cho, K; Koo, K; Hong, T and Moon, H (2008) Effect of delivery methods on design performance in multifamily housing projects. Journal of Construction Engineering and Management, 134(7), pp. 468-482. ISSN 0733-9364
Ismail, F; Ruikar, K D; Carrillo, P and Anumba, C J (2009) Technology transfer in construction: Learning from the manufacturing industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Jafari Ramiani, A; Sarvari, H; Chan, D W M; Nassereddine, H and Lotfata, A (2024) Critical success factors for private sector participation in accomplishing abandoned public sports facilities projects in Iran. International Journal of Construction Management, 24(6), pp. 586-600. ISSN 1562-3599
Johnson, T R; Feng, P; Sitzabee, W and Jernigan, M (2013) Federal acquisition regulation applied to alliancing contract practices. Journal of Construction Engineering and Management, 139(5), pp. 480-487. ISSN 0733-9364
Jones, M M (2024) Exploring accessibility, usability, and relevance: A case study of Wyoming's construction workforce training program. PhD thesis, University of Wyoming, USA.
Karakhan, A A and Gambatese, J A (2017) Integrating worker health and safety into sustainable design and construction: Designer and constructor perspectives. Journal of Construction Engineering and Management, 143(9): 04017069, ISSN 0733-9364
Karlovsek, J; Meath, C; Miles-Mwangangi, L; MacDonald, C and Brockmann, A (2024) Implementing circular economy principles in infrastructure procurement to support circular supply chains. Engineering, Construction and Architectural Management, 31(11), pp. 4645-4658. ISSN 0969-9988
Kelly, D and Ilozor, B (2022) Performance outcome assessment of the integrated project delivery (IPD) method for commercial construction projects in USA. International Journal of Construction Management, 22(14), pp. 2808-2816. ISSN 1562-3599
Kent, D C and Becerik-Gerber, B (2010) Understanding construction industry experience and attitudes toward integrated project delivery. Journal of Construction Engineering and Management, 136(8), pp. 815-825. ISSN 0733-9364
Khurana, Mayank (2021) Investigation of contractual specification and implementation of relational approaches in public private partnership (PPP) projects. PhD thesis, Virginia Tech, USA.
Kog, F and Yaman, H (2016) A multi-agent systems-based contractor pre-qualification model. Engineering, Construction and Architectural Management, 23(6), pp. 709-726. ISSN 0969-9988
Kokkonen, A (2017) Integrated project emerging within the daily project life through active participation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kraft, E R (2013) Alternative quality assurance organizations for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Labib, Y N; Lotfallah, W B; Hanna, A S and Boulos, N W (2021) Development and application of performance index for comparative assessment of public capital projects. Journal of Construction Engineering and Management, 147(2): 04020175, ISSN 0733-9364
Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.
Lee, Z P; Rahman, R A and Doh, S I (2021) Key drivers for adopting design-build in public construction projects: Malaysian perspective. Journal of Construction in Developing Countries, 26(1), pp. 131-160. ISSN 1823-6499
Liang, Y and Ashuri, B (2022) Challenges and enabling features of small and medium infrastructure public-private partnerships (p3s): A case study of the US P3 infrastructure market. Engineering, Construction and Architectural Management, 29(1), pp. 49-71. ISSN 0969-9988
Lines, B C; Kakarapalli, R and Nguyen, P H D (2022) Does best value procurement cost more than low-bid? A total project cost perspective. International Journal of Construction Education and Research, 18(1), pp. 85-100. ISSN 1557-8771
Liu, Z and Wang, N (2026) The effects of emerging digital technologies on construction project resilience: The mediating role of relational governance. Building Research & Information, 54(1), pp. 118-134. ISSN 0961-3218
Lovesmith, D M (2009) Areas of knowledge needed by superintendents and architects to enhance their collaboration in the school design process. EdD thesis, Texas A&M University, USA.
Lu, W; Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(1), pp. 118-132. ISSN 0969-9988
Luciani, Paul J (2007) An investigation into the cycle and prediction of organisation facility management procurement. PhD thesis, University of Technology Sydney, Australia.
Maali, O M (2022) Management practices to improve adoption and employee well-being during organizational changes in the AEC industry. PhD thesis, University of Kansas, USA.
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A competency-based training guide model for labourers in construction. International Journal of Construction Management, 23(8), pp. 1323-1333. ISSN 1562-3599
Manthe, M and Smallwood, J (2007) The appropriateness of built environment tertiary education: Perspectives of academics and postgraduate students. Journal of Engineering, Design and Technology, 5(2), pp. 102-119. ISSN 1726-0531
Manthe, M F and Smallwood, J J (2008) An overview of the appropriateness of tertiary built environment education in South Africa. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Martin, H; Lewis, T; Peters, E and Petersen, A (2017) Construction project delivery cloud decisionsupport model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(1), pp. 6-26. ISSN 17514304
Mathew, S A; Tran, D Q and Nguyen, P H D (2021) Evaluation of cost growth factors in design-build highway projects using structural equation modeling. Journal of Construction Engineering and Management, 147(7): 04021070, ISSN 0733-9364
Mbaraja, T Z and Moyo, T (2025) Insights on virtual reality adoption for construction workers' training in Zimbabwe. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 103-111. ISSN 17514304
Migliaccio, G C (2007) Planning for strategic change in the project delivery strategy. PhD thesis, University of Texas at Austin, USA.
Miller, J B and Evje, R H (1999) The practical application of delivery methods to project portfolios. Construction Management and Economics, 17(5), pp. 669-677. ISSN 01446193
Minchin, R E; Li, X; Issa, R R and Vargas, G G (2013) Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida. Journal of Construction Engineering and Management, 139(10): 04013007, ISSN 0733-9364
Mirzaee, A M and Martek, I (2025) Improving project management "closeout" phase outcomes: Evidence from a large general contractor in Iran using "x-inefficiency theory". Engineering, Construction and Architectural Management, 32(8), pp. 5253-5271. ISSN 0969-9988
Mokhtari, M and Hosseinian, S M (2025) Optimal outcome sharing among clients, builders, and designers in collaborative construction contracts: Comparing design–bid–build and design–build methods using principal–agent theory. Journal of Construction Engineering and Management, 151(3): 04024212, ISSN 0733-9364
Momennia Rankohi, S (2022) Investigating the concept of integration in construction projects: Cases of integrated project delivery and design for manufacturing and assembly. PhD thesis, Ecole Polytechnique, Montreal, Canada.
Muianga, Elisa Atália Daniel (2018) Evolutionary model for IPD implementation in construction projects with little diffusion of collaborative practices. PhD thesis, Universidade Estadual de Campinas, Brazil.
Mutai, A (2009) Factors influencing the use of building information modeling (BIM) within leading construction firms in the United States of America. PhD thesis, Indiana State University, USA.
Naji Almassi, A (2011) Credit value adjusted real options based valuation of multiple-exercise government guarantees for infrastructure projects. PhD thesis, University of Toronto, Canada.
Neve, H H; Wandahl, S; Kaeseler, S M and Tandrup, A (2017) Integrating IPD and exploring potentials. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Nguyen, P H D (2020) Development of fuzzy hybrid approaches to project delivery method selection in highway construction. PhD thesis, University of Kansas, USA.
Nguyen, P H D; Tran, D and Lines, B C (2020) Fuzzy set theory approach to classify highway project characteristics for delivery selection. Journal of Construction Engineering and Management, 146(5): 04020044, ISSN 0733-9364
Nguyen, P H D; Tran, D Q and Bypaneni, S P K (2021) Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways. Construction Management and Economics, 39(11), pp. 879-893. ISSN 01446193
Nguyen, P H D; Tran, D Q and Lines, B C (2020) Empirical inference system for highway project delivery selection using fuzzy pattern recognition. Journal of Construction Engineering and Management, 146(12): 04020141, ISSN 0733-9364
Nik Bakht, M (2015) Analyzing social network discussions of infrastructure projects: towards a bottom-up decision making environment. PhD thesis, University of Toronto, Canada.
Nouh, A; Elkasaby, E and Wageh, O (2024) Dynamic approach for investigating delivery system effects on infrastructure project performance. Engineering, Construction and Architectural Management, 31(12), pp. 4791-4808. ISSN 0969-9988
O'Shaughnessy, R D (1992) Criteria civil engineers use in deciding whether or not to participate in non-credit continuing engineering education programs. EdD thesis, University of Illinois at Urbana-Champaign, USA.
Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364
Okello, J F; Bowa, O and Migosi, J (2025) The role of project delivery methods on the execution of construction projects in the Kenyan judiciary. Construction Economics and Building, 25(1), pp. 49-68. ISSN 2204-9029
Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study. PhD thesis, University of Maryland, College Park, USA.
Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida. PhD thesis, George Washington University, USA.
Patel, T; Scheepbouwer, E and van der Walt, J D (2025) Optimizing infrastructure procurement: A predictive model for procurement delivery method selection in New Zealand context. International Journal of Construction Management, 25(14), pp. 1736-1748. ISSN 1562-3599
Patterson, D A; Farnsworth, C B; Hutchings, D M; Eggett, D L and Weidman, J E (2023) Comparing cost, schedule, and quality of CM/GC and DBB project delivery for repetitive commercial construction. International Journal of Construction Education and Research, 19(2), pp. 166-186. ISSN 1557-8771
Pena-Mora, F and Park, M (2001) Dynamic planning for fast-tracking building construction projects. Journal of Construction Engineering and Management, 127(6), pp. 445-456. ISSN 0733-9364
Pietroforte, R and Miller, J B (2002) Procurement methods for us infrastructure: Historical perspectives and recent trends. Building Research & Information, 30(6), pp. 425-434. ISSN 0961-3218
Pinero, J C (2003) A framework for monitoring performance-based road maintenance. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Qi, J (2011) Integration of construction worker fall safety in design through the use of building information modeling. PhD thesis, University of Florida, USA.
Raeisinafchi, R (2024) Enhancing the quality of safety training in the construction industry. PhD thesis, University of Colorado at Boulder, USA.
Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.
Riley, D R; Diller, B E and Kerr, D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), pp. 953-962. ISSN 0733-9364
Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175
Rojas, E M and Kell, I (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387-397. ISSN 0733-9364
Rosner, J W; Thal Jr, A E and West, C J (2009) Analysis of the design-build delivery method in Air Force construction projects. Journal of Construction Engineering and Management, 135(8), pp. 710-717. ISSN 0733-9364
Sabitu Oyegoke, A (2001) UK and US construction management contracting procedures and practices: A comparative study. Engineering, Construction and Architectural Management, 8(5-6), pp. 403-417. ISSN 0969-9988
Salih, F; Eissa, R and El-Adaway, I H (2024) Data-driven analysis of progressive design build in water and wastewater infrastructure projects. Journal of Construction Engineering and Management, 150(1): 04023149, ISSN 0733-9364
Sanboskani, H (2024) The implementation of integrated delivery and management in large government-owned engineering construction projects. PhD thesis, Arizona State University, USA.
Savicky, J (2023) Exploration of solicitation optimization within the built environment. PhD thesis, Arizona State University, USA.
Shabani Ardakani, S and Nik-Bakht, M (2021) Functional evaluation of change order and invoice management processes under different procurement strategies: Social network analysis approach. Journal of Construction Engineering and Management, 147(1): 1974, ISSN 0733-9364
Shafique, F (2020) Transformational leadership for sustainability in architecture engineering and construction project teams. PhD thesis, Michigan State University, USA.
Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms. PhD thesis, University of Washington, USA.
Shooshtarian, S; Lingard, H and Wong, P S P (2020) Using the cost of construction work to trigger legislative duties for WHS: The Australian experience. Built Environment Project and Asset Management, 10(3), pp. 369-387. ISSN 2044-124X
Shrestha, B (2024) Assessment of success factors and comparative analysis of public private partnership (P3) project performances against design-build and design-bid-build project delivery. PhD thesis, University of Nevada, Las Vegas, USA.
Shrestha, P P (2007) Performance benchmarking of large highway projects. PhD thesis, University of Texas at Austin, USA.
Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: Executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(7), pp. 2665-2688. ISSN 0969-9988
Shrestha, P P and Fernane, J D (2017) Performance of design-build and design-bid-build projects for public universities. Journal of Construction Engineering and Management, 143(3): 04016101, ISSN 0733-9364
Sindhu, J; Choi, K; Lavy, S; Rybkowski, Z K; Bigelow, B F and Li, W (2018) Effects of front-end planning under fast-tracked project delivery systems for industrial projects. International Journal of Construction Education and Research, 14(3), pp. 163-178. ISSN 1557-8771
Smith, V R R (2008) Impact to alternative contracting methods using multivariate analysis in the regulatory environment. PhD thesis, Georgia Institute of Technology, USA.
Solnosky, R; Parfitt, M K and Holland, R (2015) Delivery methods for a multi-disciplinary architectural engineering capstone design course. Architectural Engineering and Design Management, 11(4), pp. 305-324. ISSN 1745-2007
Songer, A D; Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(2), pp. 69-82. ISSN 1358-9180
Soon, C D (2009) Managing risk and uncertainty in transportation megaprojects. PhD thesis, University of Hawai'i at Manoa, USA.
Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction. PhD thesis, University of Colorado at Boulder, USA.
Stanford, M S and Molenaar, K R (2018) Influence of simplified procurement methods on competition for public sector construction. Journal of Construction Engineering and Management, 144(2): 04017105, ISSN 0733-9364
Sullivan, J; Asmar, M E; Chalhoub, J and Obeid, H (2017) Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6): 04017009, ISSN 0733-9364
Sunindijo, R Y and Kamardeen, I (2020) Psychological challenges confronting graduate construction students in Australia. International Journal of Construction Education and Research, 16(3), pp. 151-166. ISSN 1557-8771
Thomas, H R; Riley, D R and Sanvido, V E (1999) Loss of labor productivity due to delivery methods and weather. Journal of Construction Engineering and Management, 125(1), pp. 39-46. ISSN 0733-9364
Thomas, H R and Sanvido, V E (2000) Role of the fabricator in labor productivity. Journal of Construction Engineering and Management, 126(5), pp. 358-365. ISSN 0733-9364
Thomas, W K (2013) The impact of RFP phase project scope development on the successful outcome of construction projects using the design build project delivery method. PhD thesis, University of Alabama in Huntsville, USA.
Tiwari, R (2015) A decision-support framework for design of non-residential net-zero energy buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Tran, D (2013) A risk-based model to select delivery methods for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364
Tran, D Q; Harper, C M; Smadi, A M and Mohamed, M (2020) Staffing needs and utilization for alternative contracting methods in highway design and construction. Engineering, Construction and Architectural Management, 27(9), pp. 2163-2178. ISSN 0969-9988
Tran, D Q and Molenaar, K R (2014) Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management, 21(6), pp. 631-647. ISSN 0969-9988
Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364
Whelton, M G and Ballard, G (2002) Decriptive design study: A building facility renewal planning study. Journal of Construction Research, 3(1), pp. 17-33. ISSN 1609-9451
Williamson, K C (2018) The effect of course time compression on academic performance in construction surveying. International Journal of Construction Education and Research, 14(4), pp. 277-294. ISSN 1557-8771
Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.
Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Xia, B; Chan, A P C and Yeung, J F Y (2011) Developing a fuzzy multicriteria decision-making model for selecting design-build operational variations. Journal of Construction Engineering and Management, 137(12), pp. 1176-1184. ISSN 0733-9364
Xia, B; Molenaar, K; Chan, A; Skitmore, M and Zuo, J (2013) Determining optimal proportion of design in design-build request for proposals. Journal of Construction Engineering and Management, 139(6), pp. 620-627. ISSN 0733-9364
Yu, T; Shen, G Q and Shi, Q (2017) Comparing the performance quality of design-bid-build and design-build delivery methods. Journal of Construction Engineering and Management, 143(4): 04016111, ISSN 0733-9364
Zhang, J and Yuan, X X (2021) Stochastic modelling of maintenance flexibility in value for money assessment of PPP road projects. Construction Management and Economics, 39(2), pp. 173-191. ISSN 01446193
Zhang, K; Cui, Q and DeCorla-Souza, P (2025) Performance and efficiency diffusion of us surface transportation public-private partnerships. Journal of Construction Engineering and Management, 151(1): 04024192, ISSN 0733-9364
ke, Y; Ling, F Y Y and Ning, Y (2013) Public construction project delivery process in Singapore, Beijing, Hong Kong and Sydney. Journal of Financial Management of Property and Construction, 18(1), pp. 6-25. ISSN 1366-4387
Up a level