Abdel Aziz, A M (2023) Statistical analysis and representation models of working-days liquidated damages. Journal of Construction Engineering and Management, 149(7): 04023054, ISSN 0733-9364
Abdel Aziz, A M (2024) Statistical analysis and representation models of calendar-day liquidated damages. Journal of Construction Engineering and Management, 150(6): 04024043, ISSN 0733-9364
Alavipour, S M R and Arditi, D (2018) Optimizing financing cost in construction projects with fixed project duration. Journal of Construction Engineering and Management, 144(4): 04018012, ISSN 0733-9364
Alleman, D and Lee, E B (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), pp. 2859-2891. ISSN 0969-9988
Ameyaw, C; Mensah, S; Abaitey, B A and Asamoah-Duodu, A (2026) Adequacy of defects liability periods for public construction projects in Ghana. International Journal of Building Pathology and Adaptation, 44(1), pp. 55-69. ISSN 2398-4708
Au, Chung Yu Maria (2013) An optimal contract strategy in managing extension of time provisions in building contracts. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Brawn, D (2012) Extensions of time and liquidated damages in construction contracts in England and Wales. International Journal of Law in the Built Environment, 4(1), pp. 75-90. ISSN 1756-1450
Carty, G J (1995) Construction. Journal of Construction Engineering and Management, 121(3), pp. 319-328. ISSN 0733-9364
Chakravarty, S (2002) Essays on contracting in the construction industry. PhD thesis, University of Southern California, USA.
Chalkey, K and Green, M (2016) In the context of mediation, is safeguarding mediator neutrality and party autonomy more important than ensuring a fair settlement? International Journal of Law in the Built Environment, 8(2), pp. 161-175. ISSN 1756-1450
Chetwin, M (2011) Comparative analysis of some aspects of assessment of damages for contractual breaches in England and Wales, Australia and New Zealand. International Journal of Law in the Built Environment, 3(2), pp. 113-125. ISSN 1756-1450
Davenport, P (1993) Extensions of time: time for change. Construction Management and Economics, 11(4), pp. 305-307. ISSN 01446193
Davey, C L; McDonald, J; Lowe, D; Duff, R; Powell, J A and Powell, J E (2006) Defects liability management by design. Building Research & Information, 34(2), pp. 145-153. ISSN 0961-3218
Donohoe, S and Coggins, J (2011) Liquidated damages in construction contracts: Is there a schism between the Australian and English courts? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
El-Adaway, I H; Abotaleb, I S; Eid, M S; May, S; Netherton, L and Vest, J (2018) Contract administration guidelines for public infrastructure projects in the United States and Saudi Arabia: Comparative analysis approach. Journal of Construction Engineering and Management, 144(6): 04018031, ISSN 0733-9364
Greenwood, D; Hogg, K and Kan, S (2005) Subcontractors' liability for project delay. Journal of Financial Management of Property and Construction, 10(2), pp. 107-114. ISSN 1366-4387
Griffis, F H and Christodoulou, S (2000) Construction risk analysis tool for determining liquidated damages insurance premiums: Case study. Journal of Construction Engineering and Management, 126(6), pp. 407-413. ISSN 0733-9364
Gurmu, Argaw (2017) An investigation into construction management practices influencing labour productivity in multi-storey building projects. PhD thesis, University of Melbourne, Australia.
Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.
Haraguchi, M and Kim, S (2016) Critical infrastructure interdependence in New York city during hurricane sandy. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 133-143. ISSN 1759-5916
Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193
Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364
Huynh, H T (2021) Game theory applications in construction project management. PhD thesis, Catholic University of America, USA.
Huynh, H T; Lucko, G and Eid, M S (2023) Game theory approach for concurrent delay analysis. Journal of Construction Engineering and Management, 149(3): 04023002, ISSN 0733-9364
Ibbs, W; Nguyen, L D and Simonian, L (2011) Concurrent delays and apportionment of damages. Journal of Construction Engineering and Management, 137(2), pp. 119-126. ISSN 0733-9364
Jensen, D A and Patterson, J E (2011) Janus head of liquidated damages: Does public policy influence United States courts regarding enforceability of a liquidating damages clause? International Journal of Construction Education and Research, 7(2), pp. 143-156. ISSN 1557-8771
Jensen Jr., D A (1993) Liquidated damages clauses in construction contracts: A study of the application preference of the three-prong test by the appellate court system. PhD thesis, Texas A&M University, USA.
Jensen Jr, D A and Craig Jr, J W (1998) Testing the validity of liquidated damages clauses: Measuring the application preference and consistency of the intent test as applied by the United States court system. Construction Management and Economics, 16(3), pp. 269-281. ISSN 01446193
Kashiwagi, K; Rubin, R A and Harris, M R (1988) Construction law and practice in Japan. Journal of Construction Engineering and Management, 114(1), pp. 104-113. ISSN 0733-9364
Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599
Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(4), pp. 1679-1696. ISSN 0969-9988
Lewis, S J and Greenwood, D J (2002) The treatment of risk in construction contracts under PFI/PPP. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Loke, M K; Lee, W P and Yap, J B H (2025) Effective practical strategies for statutory adjudication in construction disputes: Perspectives from adjudicators. International Journal of Construction Management, 25(12), pp. 1488-1499. ISSN 1562-3599
Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.
Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.
Randolph Thomas, H; Smith, G R and Cummings, D J (1995) Have I reached substantial completion? Journal of Construction Engineering and Management, 121(1), pp. 121-129. ISSN 0733-9364
Randolph Thomas, H; Smith, G R and Cummings, D J (1995) Enforcement of liquidated damages. Journal of Construction Engineering and Management, 121(4), pp. 459-463. ISSN 0733-9364
Saeed, S A A (2009) Delay to projects: Cause, effect and measures to reduce/eliminate delay by mitigation/acceleration. PhD thesis, British University in Dubai, UAE.
Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction. PhD thesis, Purdue University, USA.
Shawa, H H (1995) Project related finance for construction contractors operating in the United Arab Emirates. PhD thesis, Loughborough University, UK.
Shen, L; Drew, D and Zhang, Z (1999) Optimal bid model for price-time biparameter construction contracts. Journal of Construction Engineering and Management, 125(3), pp. 204-209. ISSN 0733-9364
Towner, M and Baccarini, D (2008) Risk pricing in construction tenders: how, who, what. Construction Economics and Building, 8(1), pp. 49-60. ISSN 2204-9029
Viljoen, P S (1981) Incentive management techniques for pavement rehabilitation construction. PhD thesis, University of California, Berkeley, USA.
Whaley, A; McAdam, B and Crowe, P (2015) The acceleration dilemma: Can English law accommodate constructive acceleration? International Journal of Law in the Built Environment, 7(3), pp. 248-267. ISSN 1756-1450
Zeberga, M S; Haaskjold, H and Hussein, B (2024) Digital technologies for preventing, mitigating, and resolving contractual disagreements in the AEC industry: A systematic literature review. Journal of Construction Engineering and Management, 150(6): 03124002, ISSN 0733-9364