Items with Subject: contractual condition

Number of items: 1970.

A Kassem, M; Khoiry, M A and Hamzah, N (2020) Assessment of the effect of external risk factors on the success of an oil and gas construction project. Engineering, Construction and Architectural Management, 27(9), pp. 2767-2793. ISSN 0969-9988

Aagaard, L K and Madsen, L V (2022) Technological fascination and reluctance: Gendered practices in the smart home. Buildings & Cities, 3(1), pp. 677-691. ISSN 2632-6655

Abbas, N M A (2007) Construction claims in Saudi Arabia: a study of sources and associations of claims. PhD thesis, University of Strathclyde, UK.

Abbasian-Hosseini, S A; Hsiang, S M; Leming, M L and Liu, M (2014) From social network to data envelopment analysis: Identifying benchmarks at the site management level. Journal of Construction Engineering and Management, 140(8): 04014028, ISSN 0733-9364

Abbsaian-Hosseini, S A; Liu, M and Hsiang, S M (2019) Social network analysis for construction crews. International Journal of Construction Management, 19(2), pp. 113-127. ISSN 1562-3599

Abd Al-Jalil, Y Q (1998) Analysis of performance of tunnel boring machine-based systems. PhD thesis, University of Texas at Austin, USA.

Abdallah, A; Assaf, S and Hassanain, M A (2019) Assessment of the consequences of deficiencies in design documents in Saudi Arabia. Architectural Engineering and Design Management, 15(4), pp. 282-296. ISSN 1745-2007

Abdallah, E T; Allen, R C; Asbaugh, B W; Berrio, M M; Berg, A; Chin, R M; Delfs, E; Earley, J D; Evans, L D; Frair, P B; Howard, H P; Knowlton, J S; Manzi, J E; Mattis, L W; Miklitsch, F J; Myers, R W; O’connor, J; Sarraf, F Y; Sprouse, J R; Thompson, L J; Treadwell, E F; Turner, J F; White, A E; Wiese, J L; Allison, W A; Fisk, E R; Goldbloom, J; Jones, E; Litvin, J and Paulson, B (1987) Specification engineer: Job descriptions. Journal of Construction Engineering and Management, 113(2), pp. 179-181. ISSN 0733-9364

Abdel Aziz, A M (2021) The practice of roadway safety management in public-private partnerships. Journal of Construction Engineering and Management, 147(12): 04021173, ISSN 0733-9364

Abdel Aziz, A M (2023) Statistical analysis and representation models of working-days liquidated damages. Journal of Construction Engineering and Management, 149(7): 04023054, ISSN 0733-9364

Abdel Aziz, A M (2024) Statistical analysis and representation models of calendar-day liquidated damages. Journal of Construction Engineering and Management, 150(6): 04024043, ISSN 0733-9364

Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599

Abdel-Hamid, M.; Abdelhaleem, H. M. and Abd El-Razek Fathy, A. E. (2025) Assessing the implementation of BIM for enhancing green building certification evaluations. Architectural Engineering and Design Management, 21(5), pp. 1040-1056. ISSN 1745-2007

Abdel-Razek, R H (1987) Computerised analyses of estimating inaccuracy and tender variability: causes, evaluation and consequences. PhD thesis, Loughborough University, UK.

AbdelRazig, Y A (1999) Construction quality assessment: A hybrid decision support model using image processing and neural learning for intelligent defects recognition. PhD thesis, Purdue University, USA.

Abdelalim, A M; Salem, M; Al-Sabah, R; Said, S O; ElShafei, H M and Galal Badawy, M (2025) Optimizing claim management process groups to enhance construction project success. International Journal of Construction Management, 25(13), pp. 1583-1595. ISSN 1562-3599

Abdelgader, S H; Kurpinska, M; Abdelgader, H S; Omidi Moaf, F and Amran, M (2025) Study the impact of design method preference on the usefulness of concrete and on CO2 emissions. International Journal of Building Pathology and Adaptation, 43(4), pp. 804-825. ISSN 2398-4708

Abdelgader, S H; Kurpinska, M; Abdelgader, H S; Omidi Moaf, F and Amran, M (2025) Study the impact of design method preference on the usefulness of concrete and on CO₂ emissions. International Journal of Building Pathology and Adaptation, 43(4), pp. 804-825. ISSN 2398-4708

Abdelkhalek, Sherif Ibrahim Farag Mohamed (2022) Managing the inspection process of concrete bridge decks. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599

Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029

Abdirad, H (2020) Developing digital project delivery routines around frequent disruptions: How do AEC organizations respond to disruptive information exchange requirements? PhD thesis, University of Washington, USA.

Abdul Ghani, N and Tutesigensi, A (2023) Managing change in megaprojects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Abdul-Aziz, A R; Shiew yi, H and Jaafar, M (2007) Impact of firm characteristics on the value of resources for Malaysian private housing developers. Journal of Financial Management of Property and Construction, 12(2), pp. 95-106. ISSN 1366-4387

Abdulmajid, S A D (1967) Resource forecasting models for private housing projects. PhD thesis, University of Manchester, UK.

Abeysekera, W V K M (1997) A strategy for managing brickwork in Sri Lanka. PhD thesis, Loughborough University, UK.

Abeysinghe, G and Urand, D (1999) Why use enactable models of construction processes? Journal of Construction Engineering and Management, 125(6), pp. 437-447. ISSN 0733-9364

Abidin, N Z (2005) Using value management to improve the consideration of sustainability within construction. PhD thesis, Loughborough University, UK.

Aboagye-Nimo, E and Raidén, A B (2019) Challenging standardisation by embracing ambiguities of site safety: The case of micro construction firms. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988

Abou Houraira, A; Ouali, A; Elhammoumi, O and Fekri, A (2023) Effect of accelerated aging by temperature and moisture variation cycles on the durability of concrete. International Journal of Building Pathology and Adaptation, 41(3), pp. 533-548. ISSN 23984708

Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity. PhD thesis, University of Wisconsin - Madison, USA.

Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364

Abu Arqoub, M; Ghanbaripour, A N; Langston, C and Skulmoski, G (2023) Beyond design and delivery: Developing a model to measure end-user satisfaction (delight) in projects. Built Environment Project and Asset Management, 13(4), pp. 509-534. ISSN 2044-124X

Abu Bakar, R (1998) The management practices and organisational culture of large Malaysian construction contractors. PhD thesis, University of Reading, UK.

Abusalem, O (2020) Towards last planner system implementation in Gaza Strip, Palestine. International Journal of Construction Management, 20(5), pp. 367-384. ISSN 1562-3599

Abuwarda, Z; Mostafa, K; Morita, P and Hegazy, T (2024) Optimizing construction work-rest schedules and worker reassignment utilizing wristband physiological data. Journal of Construction Engineering and Management, 150(11): 04024149, ISSN 0733-9364

Acharya, N K; Dai Lee, Y and Man im, H (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(6), pp. 543-566. ISSN 0969-9988

Adafin, J; Rotimi, J O B and Wilkinson, S (2015) Why do the design stage elemental cost plan and final tender sum differ in New Zealand? Journal of Financial Management of Property and Construction, 20(2), pp. 116-131. ISSN 1366-4387

Adafin, J; Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(1), pp. 13-28. ISSN 1562-3599

Adafin, J; Rotimi, J O B; Wilkinson, S and Mbachu, J (2019) An assessment of risk factors impacting budget variability in New Zealand commercial construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ade-Ojo, O C (2022) Awareness of the LEED requirements for green housing development among built-environment professionals in Nigeria. Built Environment Project and Asset Management, 12(4), pp. 521-536. ISSN 2044-124X

Adebisi, E O; Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(2), pp. 210-231. ISSN 23984708

Adebowale, O J (2018) A multi-stakeholder approach to productivity improvement in the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.

Adebowale, O J and Agumba, J N (2023) A meta-analysis of factors affecting construction labour productivity in the middle East. Journal of Construction in Developing Countries, 28(1), pp. 193-220. ISSN 1823-6499

Adedokun, O; Aje, I; Awodele, O and Egbelakin, T (2022) Are the public tertiary education building projects devoid of risks in the Nigerian construction context? Journal of Financial Management of Property and Construction, 27(2), pp. 259-278. ISSN 1366-4387

Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364

Adenuga, O A (2008) Evaluation of maintenance management practice in public hospital, buildings in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.

Adesi, M; Murphy, R and Kehily, D (2018) The role of digitisation in the strategic planning process of Irish quantity surveying practices. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Adinyira, E; Adjei, E A G; Agyekum, K and Fugar, F D K (2021) Application of machine learning in predicting construction project profit in Ghana using support vector regression algorithm (svra). Engineering, Construction and Architectural Management, 28(5), pp. 1491-1514. ISSN 0969-9988

Afreen, M; Haq, F and Mukhtar, Z (2022) Flood susceptibility analysis of the panjkora valley Northern Pakistan, using frequencyratio approach. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 601-614. ISSN 1759-5916

Aftab, U; Hassan, M U; Ullah, F; Nasir, A R and Thaheem, M J (2026) BIM-based search and selection of construction material suppliers: A dedicated framework and prototype. Construction Innovation, 26(3), pp. 892-915. ISSN 1471-4175

Afzal, F; Yunfei, S; Sajid, M and Afzal, F (2020) Integrated priority decision index for risk assessment in chaos: Cost overruns in transport projects. Engineering, Construction and Architectural Management, 27(4), pp. 825-849. ISSN 0969-9988

Afzal, Muneeb (2024) Improving request for information (RFI) processing in construction projects using natural language processing (NLP) techniques. PhD thesis, University of Technology Sydney, Australia.

Agbo, E A; Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), pp. 109-125. ISSN 1823-6499

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Aguilar-Carrasco, M T; Álvarez-López, A I; Bustamante, P; Álvarez Ríos, A I and Domínguez-Amarillo, S (2025) The impact of light adjustment versus tuneable white mode on ICU staff's circadian rhythms. Building Research & Information, 53(1-2), pp. 120-138. ISSN 0961-3218

Agumba, J N (2013) A construction health and safety performance improvement model for South African small and medium enterprises. PhD thesis, University of Johannesburg, South Africa.

Agyefi-Mensah, S; Kpamma, Z E and Hagan, D E (2022) Stair step geometry compliance with standard specifications for safety and usability: A study of selected university buildings in Ghana. International Journal of Building Pathology and Adaptation, 40(1), pp. 20-39. ISSN 23984708

Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.

Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387

Ahmed, A (2012) Pavement damage cost estimation using highway agency maintenance, rehabilitation, and reconstruction strategies. PhD thesis, Purdue University, USA.

Ahmed, M; Shakaib, M and Siddiqui, M A (2024) Analysis and comparison of flow velocities and in-cylinder temperature distributions to quantify oxides of nitrogen in a compression ignition engine using diesel and biodiesel fuels. Journal of Engineering, Design and Technology, 22(2), pp. 422-437. ISSN 1726-0531

Ahmed, M O; El-Adaway, I H; Coatney, K T and Eid, M S (2016) Construction bidding and the winner's curse: Game theory approach. Journal of Construction Engineering and Management, 142(2): 04015076, ISSN 0733-9364

Ahmed, S M (1993) An integrated total quality management (TQM) model for the construction process. PhD thesis, Georgia Institute of Technology, USA.

Ahmed, S M; Yaris, C; Farooqui, R U and Saqib, M (2014) Key attributes and skills for curriculum improvement for undergraduate construction management programs. International Journal of Construction Education and Research, 10(4), pp. 240-254. ISSN 1557-8771

Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.

Ahuja, H N and Nandakumar, V (1985) Simulation model to forecast project completion time. Journal of Construction Engineering and Management, 111(4), pp. 325-342. ISSN 0733-9364

Aigbavboa, C and Thwala, W (2014) An assessment of critical success factors for the reduction of the cost of poor quality from construction projects in South Africa. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Aiyetan, Ayodeji; Das, Kumar Dillip and Ayodabo, Blessing (2026) Factors influencing procurement in construction: The role of clients and construction machinery in KwaZulu-Natal. Journal of Construction Business and Management, 8(S1), pp. 72-87. ISSN 2521-0165

Ajmal, M M; Khan, M; Gunasekaran, A and Helo, P T (2022) Managing project scope creep in construction industry. Engineering, Construction and Architectural Management, 29(7), pp. 2786-2809. ISSN 0969-9988

Akade, S A (2017) Understanding the impact of culture on project execution in a developing country: an action research study of six international oil and gas companies in Nigeria. PhD thesis, University of Liverpool, UK.

Akadiri, P O and Fadiya, O O (2013) Empirical analysis of the determinants of environmentally sustainable practices in the UK construction industry. Construction Innovation, 13(4), pp. 352-373. ISSN 1471-4175

Akbari, S; Khanzadi, M and Gholamian, M R (2018) Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index. Engineering, Construction and Architectural Management, 25(4), pp. 534-558. ISSN 0969-9988

Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK. PhD thesis, University of Salford, UK.

Akin, S; Eghbali, A; Nwagwu, C and Hertwich, E (2025) Western Asian and Northern African residential building stocks: archetype analysis. Buildings & Cities, 6(1), pp. 219-238. ISSN 2632-6655

Akinsola, A O (1997) An intelligent model of variations' contingency on constructions projects. PhD thesis, University of Wolverhampton, UK.

Akintoye, A and Chinyio, E (2005) Private finance initiative in the healthcare sector: Trends and risk assessment. Engineering, Construction and Architectural Management, 12(6), pp. 601-616. ISSN 0969-9988

Akintoye, A; Renukappa, S and Lal, H (2012) The abolition of the contracts in writing rule in the 2009 Construction Act: Potential implications for UK adjudication. International Journal of Law in the Built Environment, 4(2), pp. 140-156. ISSN 1756-1450

Akmam Syed Zakaria, S and Amtered El-Abidi, K M (2021) Economic effects of migrant labor on industrialized building system (IBS) adoption in the Malaysian construction industry. Architectural Engineering and Design Management, 17(1-2), pp. 50-66. ISSN 1745-2007

Akpan, E O P and Igwe, O (2001) Methodology for determining price variation in project execution. Journal of Construction Engineering and Management, 127(5), pp. 367-373. ISSN 0733-9364

Aktas, E (2001) Structural design code calibration using reliability-based cost optimization. PhD thesis, University of Pittsburgh, USA.

Akyol, B and Resatoglu, R (2019) Investigating the effect of solid and lightweight hollow block slabs on construction cost. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(2), pp. 70-79. ISSN 17514304

Al Nahyan, M T; Hawas, Y E and Raza, M (2021) An exploratory study of relationships between stakeholders' risk perceptions and their roles and experience in construction industry. International Journal of Construction Management, 21(7), pp. 738-754. ISSN 1562-3599

Al Rashdi, A (2012) A strategic framework for the further enhancement of the standard forms of construction contract in the Sultanate of Oman. PhD thesis, University of Salford, UK.

Al Zarooni, S; Abdou, A and Lewis, J (2011) Improving the client briefing for UAE public healthcare projects: Space programming guidelines. Architectural Engineering and Design Management, 7(4), pp. 251-265. ISSN 1745-2007

Al kailani, H.; Bhattacharjee, K.; Bonilla, M. and Nnaji, C. (2026) Tailoring perceived workforce sustainability strategies in the US construction industry. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Al kailani, H.; Bhattacharjee, K.; Bonilla, M. and Nnaji, C. (2026) Tailoring perceived workforce sustainability strategies in the US construction industry. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Al-Bizri, S and Gray, C (2014) A decision support framework for hcai risk assessment and design briefing of healthcare facilities. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.

Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.

Al-Ghamdi, S G (2015) Advancing green building rating systems using life-cycle assessment. PhD thesis, University of Pittsburgh, USA.

Al-Hajj, A and Hamani, K (2011) Material waste in the UAE construction industry: Main causes and minimization practices. Architectural Engineering and Design Management, 7(4), pp. 221-235. ISSN 1745-2007

Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(4), pp. 459-470. ISSN 01446193

Al-Hashimy, H N H (2025) The relationship between financial management strategies and firm financial performance: the moderating role of firm size. Journal of Financial Management of Property and Construction, 30(2), pp. 295-317. ISSN 1366-4387

Al-Jibouri, S and Ogink, G (2009) Proposed model for integrating rams method in the design process in construction. Architectural Engineering and Design Management, 5(4), pp. 179-192. ISSN 1745-2007

Al-Kofahi, Z G; Mahdavian, A and Oloufa, A (2022) System dynamics modeling approach to quantify change orders impact on labor productivity 1: Principles and model development comparative study. International Journal of Construction Management, 22(7), pp. 1355-1366. ISSN 1562-3599

Al-Meshekeh, H S S (1991) The relationship between conflict management style and construction project effectiveness. PhD thesis, University of Strathclyde, UK.

Al-Momani, A H (1996) Construction cost prediction for public school buildings in Jordan. Construction Management and Economics, 14(4), pp. 311-317. ISSN 01446193

Al-Musallam, A A (2002) A web-based approach for coordinating architectural drawings with other construction documents. PhD thesis, Illinois Institute of Technology, USA.

Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.

Al-Otaibi, S (2010) A framework for improving the performance of standard design models in the Saudi Ministry of Interior projects. PhD thesis, Loughborough University, UK.

Al-Qawasmi, J (2019) Examining indicators coverage in a sample of sustainable building assessment systems. Architectural Engineering and Design Management, 15(2), pp. 101-120. ISSN 1745-2007

Al-Sakkaf, A; Bagchi, A; Zayed, T and Mahmoud, S (2023) Sustainability assessment model for heritage buildings. Smart and Sustainable Built Environment, 12(1), pp. 105-127. ISSN 2046-6099

Al-Sehali, J (2001) A framework for total quality management in the construction industry in Bahrain. PhD thesis, Loughborough University, UK.

Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(4), pp. 1136-1157. ISSN 1726-0531

Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988

AlMaian, R Y; Needy, K L; Walsh, K D and Alves, T D C L (2016) A qualitative data analysis for supplier quality-management practices for engineer-procure-construct projects. Journal of Construction Engineering and Management, 142(2): 04015061, ISSN 0733-9364

AlQahtany, A; Rezgui, Y and Li, H (2013) A proposed model for sustainable urban planning development for environmentally friendly communities. Architectural Engineering and Design Management, 9(3), pp. 176-194. ISSN 1745-2007

Alaboud, N S M (2016) Development of a framework to enhance communication practice for site-based construction workers in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Aladağ, H and Işık, Z (2019) Design and construction risks in BOT type mega transportation projects. Engineering, Construction and Architectural Management, 26(10), pp. 2223-2242. ISSN 0969-9988

Alahmadi, N H (2018) Nudging contracting firms rivals within municipal road projects in Saudi Arabia to bid competitively. PhD thesis, University of Strathclyde, UK.

Alajmani, H; Ahmed, S and El-Sayegh, S M (2024) Factors causing delays in the UAE construction industry amid the covid-19 pandemic. Journal of Financial Management of Property and Construction, 29(1), pp. 135-151. ISSN 1366-4387

Alam, Sadaf (2024) Development of the framework and the methodologies towards nzebs in Finland. PhD thesis, Aalto University, Finland.

Alani, Y (2023) A semantic framework for the life cycle of water assets data exchange. PhD thesis, Teesside University, UK.

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.

Alasad, R; Motawa, I and Ogunlana, S (2012) A system dynamics-based method for demand forecasting in infrastructure projects: A case of PPP projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Alcantara Jr., P T (1996) Development of a computer-understandable representation of design rationale to support value engineering. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Algraiw, I H A (2015) The engagement of expert opinions in the modeling of multi-attribute decision making for the selection of project delivery methods in building construction. PhD thesis, Missouri University of Science and Technology, USA.

Alhadidi, Suleiman (2023) Real-time architecture: Quantifying the spatial performance of workplaces. DDes thesis, Harvard University, USA.

Ali, A H; Kineber, A F; Elyamany, A; Ibrahim, A H and Daoud, A O (2025) Application of Ginni's mean analysis for identifying the stationary driver enhancing modular construction adoption in the building industry. International Journal of Construction Management, 25(3), pp. 322-333. ISSN 1562-3599

Ali, A S; Azmi, N F and Baaki, T K (2018) Cost performance of building refurbishment works: The case of Malaysia. International Journal of Building Pathology and Adaptation, 36(1), pp. 41-62. ISSN 23984708

Ali, B; Aibinu, A A and Paton-Cole, V (2024) Closing the information gaps: A systematic review of research on delay and disruption claims. Construction Innovation, 24(3), pp. 790-810. ISSN 1471-4175

Alinaitwe, H and Ayesiga, R (2013) Success factors for the implementation of public-private partnerships in the construction industry in Uganda. Journal of Construction in Developing Countries, 18(2), pp. 1-14. ISSN 1823-6499

Aliu, J; Oke, A E; Oluwasogo Oyediran, A; Kanya, R A and Ukaha Onyeukwu, S (2026) From isolation to interaction: Evaluating social media awareness and adoption in a developing construction industry. Smart and Sustainable Built Environment, 15(1), pp. 273-293. ISSN 2046-6099

Alkhalifah, S J; Tuffaha, F M; Al Hadidi, L A and Ghaithan, A (2023) Factors influencing change orders in oil and gas construction projects in Saudi Arabia. Built Environment Project and Asset Management, 13(3), pp. 430-452. ISSN 2044-124X

Allahi, Fahimeh (2020) Development of simulation based approaches for cost estimation and effect analysis in industrial and humanitarian projects, including system dynamic model and Monte Carlo simulation. PhD thesis, Università degli Studi di Genova, Italy.

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Almarri, K (2021) Comparative analysis of the value for money factors of PPPs between the UAE and the UK. International Journal of Construction Management, 21(4), pp. 416-426. ISSN 1562-3599

Almarri, K (2023) The value for money factors and their interrelationships for smart city public-private partnerships projects. Construction Innovation, 23(4), pp. 815-832. ISSN 1471-4175

Almarri, K; Aljarman, M and Boussabaine, H (2019) Emerging contractual and legal risks from the application of building information modelling. Engineering, Construction and Architectural Management, 26(10), pp. 2307-2325. ISSN 0969-9988

Almarri, K and Boussabaine, H (2017) Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Built Environment Project and Asset Management, 7(5), pp. 546-556. ISSN 2044-124X

Almazroa, D A (2003) Project delivery system decision framework using the weighting factors and analytic hierarchy process methods. PhD thesis, University of Pittsburgh, USA.

Almusharraf, A and Whyte, A (2016) Task-based defect management: Anatomical classification. Built Environment Project and Asset Management, 6(3), pp. 345-358. ISSN 2044-124X

Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.

Alnuaimi, A S; Taha, R A; Al Mohsin, M and Al-Harthi, A S (2010) Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615-622. ISSN 0733-9364

Alotaibi, A B (2019) Project management: the implication of project management practices on project success in Saudi Arabia. PhD thesis, University of Portsmouth, UK.

Aloyce, D; Monko, R J and Luvara, V G M (2024) Critical audit indicators for assessing construction projects performance (CPP) at pre-contract stage in Tanzania. International Journal of Construction Management, 24(5), pp. 530-539. ISSN 1562-3599

Alqady, M (2012) Leveraging text content for management of construction project documents. PhD thesis, Purdue University, USA.

Alqahtani, A and Whyte, A (2013) Artificial neural networks incorporating cost significant items towards enhancing estimation for (life-cycle) costing of construction projects. Construction Economics and Building, 13(3), pp. 51-64. ISSN 2204-9029

Alsahly, F F M (2016) Improving the management of change requests in construction of large building projects in Saudi Arabia. PhD thesis, University of Hull, UK.

Alsharif, M A (2017) Improving sustainability on university campuses in Saudi Arabia: An assessment of organisational and decision-related opportunities and barriers. PhD thesis, University of Reading, UK.

Alshdiefat, A S (2018) Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry. PhD thesis, University of Salford, UK.

Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.

Alsohiman, N K (2017) Modelling variation for improving the management of construction engineering project outcomes in the Kingdom of Saudi Arabia. PhD thesis, University of Liverpool, UK.

Alsuliman, J; Bowles, G and Chen, Z (2012) Current practice of variation order management in the Saudi construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.

Altaf, A (2022) Integrating safety, security and human factors engineering in rail infrastructure design and evaluation. PhD thesis, Bournemouth University, UK.

Altamimi, M (2024) BIM adoption in local-based architecture and engineering SMEs : Developing an application-based method to pinpoint objective BIM uses and align them with business standards to facilitate the execution of BIM projects in prospective architecture and engineering SMEs. PhD thesis, University of Pécs, Hungary.

Altuwaijri, H A (2014) A study of the relationship between the use of GIS and project success in selected construction organizations. PhD thesis, Eastern Michigan University, USA.

Alutaibi, A (2018) The impact of facility management practices on tenant satisfaction forresidential complexes in the Kingdom of Saudi Arabiaresidential complexes in the Kingdom of Saudi Arabia. PhD thesis, Loughborough University, UK.

Alves, T d C L (2005) Buffering practices in HVAC ductwork supply chains. PhD thesis, University of California, Berkeley, USA.

Alzeraa, A (2018) Impact of project communications effectiveness on construction disputes. PhD thesis, Wayne State University, USA.

Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599

Amekudzi, A (1999) Uncertainty analysis of national highway performance measures in the context of evolving analysis models and data. PhD thesis, Carnegie Mellon University, USA.

Ameyaw, E E; Edwards, D J; Kumar, B; Thurairajah, N; Owusu-Manu, D G and Oppong, G D (2023) Critical factors influencing adoption of blockchain-enabled smart contracts in construction projects. Journal of Construction Engineering and Management, 149(3): 04023003, ISSN 0733-9364

Amin, S H (2024) Predictive relationship in time and cost between planning and construction phases in capital projects. DBA thesis, Grand Canyon University, USA.

Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.

Aminian, E (2015) A study of inter-firm opportunism in the construction industry. PhD thesis, University of Manchester, UK.

Amirkhanian, S N; Burati, J L and Mirchandani, H C (1994) Effect of testing variability on contractor payment for asphalt pavements. Journal of Construction Engineering and Management, 120(3), pp. 579-592. ISSN 0733-9364

Ammar, M A and Abdel-Maged, A F (2018) Modeling of LOB scheduling with learning development effect. International Journal of Construction Management, 18(6), pp. 517-526. ISSN 1562-3599

Amoah, C and Nkosazana, H (2022) Effective management strategies for construction contract disputes. International Journal of Building Pathology and Adaptation, 41(6), pp. 70-84. ISSN 23984708

Amoo, O; Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in eastern cape South Africa: A case study. Journal of Construction Business and Management, 5(2), pp. 54-67. ISSN 2521-0165

Amponsah, C T (2010) Public-private partnerships: Critical success factors for procurements of capital projects. PhD thesis, Capella University, USA.

Amponsah, C T and Forbes, J L (2012) Public-private partnerships: Critical factors for procurement of capital projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 211-221. ISSN 17514312

Amuda-Yusuf, G and Mohamed, S F (2015) Essential features of a building services standard method of measurement in Malaysia. Engineering, Construction and Architectural Management, 22(6), pp. 749-770. ISSN 0969-9988

Anagnostopoulos, I (2018) Generating as-is BIMs of existing buildings: from planar segments to spaces. PhD thesis, University of Cambridge, UK.

Anand, K B and Ramamurthy, K (2003) Laboratory-based productivity study on alternative masonry systems. Journal of Construction Engineering and Management, 129(3), pp. 237-242. ISSN 0733-9364

Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364

Anderson, B and James, P (2021) Covid-19 lockdown: Impacts on gb electricity demand and CO2 emissions. Buildings & Cities, 2(1), pp. 134-149. ISSN 2632-6655

Anderson, J (2023) Reducing embodied carbon in the built environment: The role of environmental product declarations. PhD thesis, Open University, UK.

André, J P C G (2014) Determination of the main parameters affecting the performance of bridge falsework systems. PhD thesis, Oxford Brookes University, UK.

Ang, G; Groosman, M and Scholten, N P M (2005) Dutch performance-based approach to building regulations and public procurement. Building Research & Information, 33(2), pp. 107-119. ISSN 0961-3218

Anike, E E; Saidani, M; Ganjian, E; Tyrer, M and Olubanwo, A O (2019) The potency of recycled aggregate in new concrete: a review. Construction Innovation, 19(4), pp. 594-613. ISSN 1471-4175

Ankrah, N A; Proverbs, D and Debrah, Y (2009) Factors influencing the culture of a construction project organisation: An empirical investigation. Engineering, Construction and Architectural Management, 16(1), pp. 26-47. ISSN 0969-9988

Anwer, S; Li, H; Umer, W; Antwi-Afari, M F; Mehmood, I; Yu, Y; Haas, C and Wong, A Y L (2023) Identification and classification of physical fatigue in construction workers using linear and nonlinear heart rate variability measurements. Journal of Construction Engineering and Management, 149(7): 04023057, ISSN 0733-9364

Appleton, B J A; Niaz, M A; Abourizk, S M; Al-Hussein, M and Mohamed, Y (2006) Priority rating logic simulation model for tower crane operations management. Journal of Construction Research, 7(1), pp. 133-147. ISSN 1609-9451

Apu, N and Sinha, R (2020) Seismic fragility assessment of ductile reinforced concrete building frames. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 425-442. ISSN 1759-5916

Arain, F M (2006) Knowledge-based decision support system (kbdss) for management of variation orders for school building projects in Singapore. PhD thesis, National University of Singapore, Singapore.

Arain, F M (2009) Leveraging on information technology to teach construction law to built environment students: A knowledge-based system approach. Journal of Construction in Developing Countries, 14(2), pp. 77-102. ISSN 1823-6499

Arain, F M and Pheng, L S (2005) How design consultants perceive potential causes of variation orders for institutional buildings in Singapore. Architectural Engineering and Design Management, 1(3), pp. 181-196. ISSN 1745-2007

Arain, F M and Pheng, L S (2007) Modeling for management of variations in building projects. Engineering, Construction and Architectural Management, 14(5), pp. 420-433. ISSN 0969-9988

Aramali, V; Gibson, G E; El Asmar, M and Sanboskani, H (2023) Novel earned value management system maturity framework and its relation to project performance. Journal of Construction Engineering and Management, 149(6): 04023031, ISSN 0733-9364

Arar, A J; Papineau, C and Poirier, E (2024) An empirical evaluation of the causes leading to binding dispute resolution mechanisms in the quebec construction industry. International Journal of Construction Management, 24(7), pp. 761-770. ISSN 1562-3599

Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2013) A new approach for modelling variability in residential construction projects. Construction Economics and Building, 13(2), pp. 83-92. ISSN 2204-9029

Arayici, Y (2004) Requirements engineering in innovative systems developments for the construction industry. PhD thesis, University of Salford, UK.

Arditi, D (1984) Graduate education in construction management. Construction Management and Economics, 2(3), pp. 193-199. ISSN 01446193

Arditi, D; Akan, G T and Gurdamar, S (1985) Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(2), pp. 171-181. ISSN 01446193

Arditi, D and Gunaydin, H M (1998) Factors that affect process quality in the life cycle of building projects. Journal of Construction Engineering and Management, 124(3), pp. 194-203. ISSN 0733-9364

Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193

Arida, M A (2024) Enhancing thermal comfort in commercial buildings: Contributions of machine learning algorithms for optimizing predictive thermal comfort indices. PhD thesis, North Carolina Agricultural and Technical State University, USA.

Arslan, M A O; Thiruchelvam, S and Hayder, G (2024) Measuring the availability of the requirements of the quality management system (ISO 9001:2015) clause leadership, performance, and planning: A case study. International Journal of Construction Management, 24(8), pp. 867-874. ISSN 1562-3599

Art Chaovalitwongse, W; Wang, W; Williams, T P and Chaovalitwongse, P (2012) Data mining framework to optimize the bid selection policy for competitively bid highway construction projects. Journal of Construction Engineering and Management, 138(2), pp. 277-286. ISSN 0733-9364

Asadi, R; Rotimi, J O B and Wilkinson, S (2023) Analyzing underlying factors of rework in generating contractual claims in construction projects. Journal of Construction Engineering and Management, 149(6): 04023036, ISSN 0733-9364

Ashraf, H and Rowlinson, S (2015) The importance of context in conflict management: Explicating the notion of conflict management climate and agenda setting for future research. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ashton, P and Gidado, K (2004) The practical application of a site investigation risk evaluation system. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ashuri, B and Lu, J (2010) Time series analysis of ENR construction cost index. Journal of Construction Engineering and Management, 136(11), pp. 1227-1237. ISSN 0733-9364

Ashuri, B; Shahandashti, S M and Lu, J (2012) Empirical tests for identifying leading indicators of ENR construction cost index. Construction Management and Economics, 30(11), pp. 917-927. ISSN 1466433X

Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364

Asiedu, R and Iddris, F (2022) Value co-creation approach to management of construction project stakeholders. Journal of Construction in Developing Countries, 27(1), pp. 1-23. ISSN 1823-6499

Asiedu, R O and Ameyaw, C (2021) A system dynamics approach to conceptualise causes of cost overrun of construction projects in developing countries. International Journal of Building Pathology and Adaptation, 39(5), pp. 831-851. ISSN 23984708

Asiedu, R O; Frempong, N K and Nani, G (2016) Parametric time overrun estimation of building projects. Journal of Financial Management of Property and Construction, 21(3), pp. 253-268. ISSN 1366-4387

Asimakopoulou, E; Anumba, C J and Bouchlaghem, N M (2004) Emergency response management: A review of current approaches. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran. PhD thesis, Nottingham Trent University, UK.

Assaad, R; El-Adaway, I H; El Hakea, A H; Parker, M J; Henderson, T I; Salvo, C R and Ahmed, M O (2020) Contractual perspective for BIM utilization in US construction projects. Journal of Construction Engineering and Management, 146(12): 04020128, ISSN 0733-9364

Assadi, S O A (1997) An investigation of the records kept by supervisors on construction sites. PhD thesis, University of Newcastle upon Tyne, UK.

Assaf, G and Assaad, R H (2024) A data-driven decision-support tool for selecting the optimal project delivery method for bundled projects: Integrating machine learning and expert domain knowledge. Journal of Construction Engineering and Management, 150(12): 04024181, ISSN 0733-9364

Assaf, S; Hassanain, M A; Abdallah, A; Sayed, A M Z and Alshahrani, A (2019) Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(5), pp. 597-615. ISSN 2044-124X

Atkin, B (1993) Stereotypes and themes in building designs: Insights for model builders. Construction Management and Economics, 11(2), pp. 119-130. ISSN 01446193

Attara, M G (2015) Predicting cost overrun of railroad bridge construction. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.

Attarzadeh, M; Nath, T and Tiong, R L K (2015) Identifying key factors for building information modelling adoption in Singapore. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(5), pp. 220-231. ISSN 17514304

Attia, D A; Maarouf, I; Taha, D and Nassar, D (2020) Detecting failures in conservation practice in relation to cultural significance: The case of heritage buildings in Khartoum. Building Research & Information, 48(2), pp. 124-139. ISSN 0961-3218

Au, Chung Yu Maria (2013) An optimal contract strategy in managing extension of time provisions in building contracts. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Austin, S; Baldwin, A and Waskett, P (1997) Development of a prototype building design management tool. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Awuku, B; Asa, E and Baffoe-Twum, E (2024) Conceptual cost estimation of highway bid unit prices using ordinary kriging. International Journal of Construction Management, 24(3), pp. 351-360. ISSN 1562-3599

Awuzie, B O (2014) A viable infrastructure delivery systems model for achieving socio-economic benefits in the Nigerian oil and gas industry. PhD thesis, University of Salford, UK.

Ayhan, M; Dikmen, I and Talat Birgonul, M (2021) Predicting the occurrence of construction disputes using machine learning techniques. Journal of Construction Engineering and Management, 147(4): 04021022, ISSN 0733-9364

Ayo-Odifiri, S O (2025) A systematic review of the applicability of nature-based solutions for resilient urban residences in southern Nigeria. International Journal of Disaster Resilience in the Built Environment, 16(3), pp. 344-362. ISSN 1759-5908

Ayodele, E O (2017) Development of a framework in minimising errors in construction documents in Nigeria. PhD thesis, University of Salford, UK.

Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.

Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364

Aziz, Hayder (2007) A methodology for the distributed and collaborative management of engineering knowledge. PhD thesis, Cranfield University, UK.

Azman, M A (2016) Bidding competitiveness: A comparative analysis of different bid auctions in Malaysia. Journal of Engineering, Design and Technology, 14(4), pp. 678-698.

Babaeian Jelodar, M; Yiu, T W and Wilkinson, S (2022) Empirical modeling for conflict causes and contractual relationships in construction projects. Journal of Construction Engineering and Management, 148(5): 04022017, ISSN 0733-9364

Babalola, A; Cheung, C M; Yunusa-Kaltungo, A; Manu, P and Bartolo, P (2024) A conceptual framework and tools characteristics for developing an immersive technology-based occupational health training mechanism. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Babalola, O and Adesanya, D A (2007) An evaluation of the level of accuracy of electrical services cost estimates in Nigeria. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Babalola, O O (2011) A model based framework for semantic interpretation of architectural construction drawings. PhD thesis, Georgia Institute of Technology, USA.

Baborska-Narozny, M; Bandurski, K and Grudzinska, M (2025) Understanding shading through home-use experience, measurement and modelling. Buildings & Cities, 6(1), pp. 466-489. ISSN 2632-6655

Bacon, M (2014) Occupancy analytics: A new basis for low-energy-low-carbon hospital design and operation in the UK. Architectural Engineering and Design Management, 10(1-2), pp. 146-163. ISSN 1745-2007

Badenfelt, U (2008) The selection of sharing ratios in target cost contracts. Engineering, Construction and Architectural Management, 15(1), pp. 54-65. ISSN 0969-9988

Baek, F; Sohn, J; Bae, J; Kim, D and Lee, S (2026) Physical, cognitive, and emotional responses and their interrelated effects on human-robot team performance in construction. Journal of Construction Engineering and Management, 152(1): 04025224, ISSN 0733-9364

Baek, M and Ashuri, B (2019) Analysis of the variability of submitted unit price bids for asphalt line items in highway projects. Journal of Construction Engineering and Management, 145(4): 04019020, ISSN 0733-9364

Bahadorestani, A; Karlsen, J T and Motahari Farimani, N (2019) A comprehensive stakeholder-typology model based on salience attributes in construction projects. Journal of Construction Engineering and Management, 145(9): 04019048, ISSN 0733-9364

Bai, Y and Amirkhanian, S N (1994) Knowledge-based expert system for concrete mix design. Journal of Construction Engineering and Management, 120(2), pp. 357-373. ISSN 0733-9364

Baker, S; Ponniah, D and Smith, S (1999) Risk response techniques employed currently for major projects. Construction Management and Economics, 17(2), pp. 205-213. ISSN 01446193

Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Balali, V; Zalavadia, A and Heydarian, A (2020) Real-time interaction and cost estimating within immersive virtual environments. Journal of Construction Engineering and Management, 146(2): 04019098, ISSN 0733-9364

Balamurali Kanagaraj; Tattukolla Kiran; Anand N; Khalifa Al Jabri and Justin S (2023) Development and strength assessment of eco-friendly geopolymer concrete made with natural and recycled aggregates. Construction Innovation, 23(3), pp. 524-545. ISSN 1471-4175

Baldwin, A N (1982) Computer aided estimating for civil engineering contractors. PhD thesis, Loughborough University, UK.

Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; González-Cruz, M C; Pastor-Fernández, A and Otero-Mateo, M (2021) Standard deviation of bids for construction contract auctions. Journal of Construction Engineering and Management, 147(8): 04021096, ISSN 0733-9364

Balogun, O J (2019) Innovation in quantity surveying practice firms: an investigation of innovation response during compressed pre-contract timelines in Nigeria. PhD thesis, University of Salford, UK.

Bamford, N; Charters, W; Lacey, R; Mills, A; Radovic, D; Robinson, J; Williams, P and Yencken, D (1998) Environment and sustainability in commercial office buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Banakar, Fereshteh (2024) Extending BIM (building information modelling) object model for road infrastructure operation and maintenance. PhD thesis, Queensland University of Technology, Australia.

Bandara, C; Dissanayake, D M P P; Karunasena, G and Madhusanka, N (2018) Mitigation of challenges in sustaining green certification in the Sri Lankan hotel sector. Built Environment Project and Asset Management, 8(5), pp. 515-527. ISSN 2044-124X

Bansal, V K and Pal, M (2009) Extended GIS for construction engineering by adding direct sunlight visualisations on buildings. Construction Innovation, 9(4), pp. 406-419. ISSN 1471-4175

Barati, Khalegh (2018) Modeling fuel use, emissions and mass of on-road construction equipment through monitoring field operations. PhD thesis, University of New South Wales, Australia.

Barnes, W C (1993) Microcomputers in management of construction operations. Journal of Construction Engineering and Management, 119(2), pp. 403-412. ISSN 0733-9364

Barnes, W C (2000) Defective workmanship: A transatlantic analysis of construction law and practice. PhD thesis, University of Birmingham, UK.

Barot, B (2002) Growth and business cycles for the Swedish economy. Journal of Construction Research, 3(2), pp. 217-253. ISSN 1609-9451

Barraza, G A; Back, W E and Mata, F (2004) Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25-32. ISSN 0733-9364

Barraza, G A and Bueno, R A (2007) Probabilistic control of project performance using control limit curves. Journal of Construction Engineering and Management, 133(12), pp. 957-965. ISSN 0733-9364

Barros D'Sa, A A J (2003) Changes in the liabilities and concerns of the construction professions at the turn of the 21st century. PhD thesis, University of Manchester, UK.

Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.

Battikha, M (2000) A computer-based system for construction quality management with application to highway pavements. PhD thesis, University of British Columbia, Canada.

Battikha, M G (2008) Reasoning mechanism for construction nonconformance root-cause analysis. Journal of Construction Engineering and Management, 134(4), pp. 280-288. ISSN 0733-9364

Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.

Bavi, R (2005) The development of a model design-build specification document for educational facilities construction projects. EdD thesis, Wilmington College (Delaware), USA.

Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.

Bayrak, T (2008) Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge. PhD thesis, Heriot-Watt University, UK.

Belhadj, T A (1989) Computer aided architectural evaluation and design: a cost modelling experiment. PhD thesis, University of Sheffield, UK.

Beliveau, Y J (1984) A cost control model for on-site work activities for construction (estimating, cost-codes, forms). PhD thesis, Purdue University, USA.

Bello, A O; Isa, R B; Afolabi, O P; Arogundade, S and Khan, A A (2025) Drivers for the implementation of circular economy in the Nigerian aeco industry: A structural equation modelling approach. Journal of Engineering, Design and Technology, 23(3), pp. 953-972. ISSN 1726-0531

Bello, N A; Abdullahi, B C; Atilola, M I and Thontteh, E O (2023) Review of the methodological approach of analysing rental income of residential property in Abuja, Nigeria. Journal of Financial Management of Property and Construction, 28(1), pp. 107-126. ISSN 1366-4387

Bello, N A; Agava, Y H and Olanrele, O O (2021) Investment property typology analysis; evidence from Nigerian urban property returns and macroeconomic variables. African Journal of Built Environment Research, 5(1), pp. 77-96. ISSN 2414-0236

Bello W A, O K T (2013) Weak management of the predictability of contingency allowance in construction projects in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Belusko, M; Timothy, M and Leary, O (2010) Cost analyses of measures to improve residential energy ratings to 6 stars: Playford North development, South Australia. Construction Economics and Building, 10(1-2), pp. 36-47. ISSN 2204-9029

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.

Benjaoran, V; Sooksil, N and Metham, M (2019) Effect of demand variations on steel bars cutting loss. International Journal of Construction Management, 19(2), pp. 137-148. ISSN 1562-3599

Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.

Bennett, J and Ferry, D (1990) Specialist contractors: A review of issues raised by their new role in building. Construction Management and Economics, 8(3), pp. 259-283. ISSN 01446193

Bensalah, M; Elouadi, A and Mharzi, H (2019) Overview: The opportunity of BIM in railway. Smart and Sustainable Built Environment, 8(2), pp. 103-116. ISSN 2046-6099

Berente, N; Baxter, R and Lyytinen, K (2010) Dynamics of inter-organizational knowledge creation and information technology use across object worlds: The case of an innovative construction project. Construction Management and Economics, 28(6), pp. 569-588. ISSN 1466433X

Bergsdal, H; Brattebø, H; Bohne, R A and Müller, D B (2007) Dynamic material flow analysis for norway's dwelling stock. Building Research & Information, 35(5), pp. 557-570. ISSN 0961-3218

Bernold, L E (1985) Productivity transients in construction processes. PhD thesis, Georgia Institute of Technology, USA.

Betts, M (1990) Methods and data used by large building contractors in preparing tenders. Construction Management and Economics, 8(4), pp. 399-414. ISSN 01446193

Bewry, S and Kenley, R (1998) Development of service delivery through asset management. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bhandiwad, M S; Dodamani, B M and M.D, D (2025) Effect of the drag coefficient on the performance of vertical porous baffles in a sloshing tank. Journal of Engineering, Design and Technology, 23(3), pp. 744-765. ISSN 1726-0531

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Bienvenido-Huertas, D; Rubio-Bellido, C; Sánchez-García, D and Moyano, J (2019) Internal surface condensation risk in façades of Spanish social dwellings. Building Research & Information, 47(8), pp. 928-947. ISSN 0961-3218

Bilhaif, A (1990) The influence of high temperatures on the productivity of construction workers. PhD thesis, University of Reading, UK.

Bin Sh Said, S A A (2020) The adoption of building information modelling in facilities management. PhD thesis, Oxford Brookes University, UK.

Birchall, S J (2011) An appraisal of the performance of a 'green' office building. PhD thesis, University of Leeds, UK.

Birgonul, M T; Dikmen, I and Bektas, S (2015) Integrated approach to overcome shortcomings in current delay analysis practices. Journal of Construction Engineering and Management, 141(4): 04014088, ISSN 0733-9364

Bishop, E A (1997) Talking shop: Egyptian engineers and Soviet specialists at the Aswan High Dam. PhD thesis, University of Chicago, USA.

Bittner, R B and Schmitt, R L (2011) Construction engineering process and knowledge requirements for fostering creative design solutions on infrastructure projects. Journal of Construction Engineering and Management, 137(10): 0000303, ISSN 0733-9364

Blomberg, D; Cotellesso, P; Sitzabee, W and Thal, A E (2014) Discovery of internal and external factors causing military construction cost premiums. Journal of Construction Engineering and Management, 140(3): 4013060, ISSN 0733-9364

Bokor, O (2022) Improving labour productivity in construction. A hybrid machine learning approach. PhD thesis, University of Northumbria at Newcastle, UK.

Bolchover, J and Mundle, K (2026) Post-disaster reconstruction: Infill housing prototypes for kathmandu. Buildings & Cities, 7(1), pp. 273-292. ISSN 2632-6655

Bonilla, M; Castelblanco, G and Rasdorf, W (2026) The paradox of project performance: The role of procurement, contextual, and contractor-related factors. Journal of Construction Engineering and Management, 152(6): 04026062, ISSN 0733-9364

Boothman, J C; Higham, A and Horsfall, B (2012) Attaining zero defects within building schools for the future: A realistic target or a sisyphean task? In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Bordalo Faustino, P (2017) Public procurement award criteria in the EU member states: a comparative study of the discretionary powers of contracting authorities. PhD thesis, University of Nottingham, UK.

Bordass, B (2000) Cost and value: Fact and fiction. Building Research & Information, 28(5-6), pp. 338-352. ISSN 0961-3218

Borg, M (2001) Environmental assessment of materials, components and buildings: Building-specific considerations, open-loop recycling, variations in assessment results and the usage phase of buildings. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Borges, W F and Mário, P D C (2017) Five project-duration control methods in time units: Case study of a linearly distributed planned value. Journal of Construction Engineering and Management, 143(6): 05017002, ISSN 0733-9364

Borgeson, S and Brager, G (2011) Comfort standards and variations in exceedance for mixed-mode buildings. Building Research & Information, 39(2), pp. 118-133. ISSN 0961-3218

Borrallo-Jiménez, M; Esquivias, P M; Fernández-Agüera, J and LopezDeAsiain, M (2025) Hybrid ventilation in a nearly zero-energy building as a function of users' habits for better indoor air quality and thermal comfort in a warm climate. Building Research & Information, 53(1-2), pp. 77-94. ISSN 0961-3218

Bosserman, B E and Ford, M E (1984) Development of computerized specifications. Journal of Construction Engineering and Management, 110(3), pp. 375-384. ISSN 0733-9364

Botti, A (2020) The development of an early stage design tool to assess the risk of overheating for UK residential buildings. PhD thesis, University of Surrey, UK.

Bouchlaghem, K A D and Pasquire, C (2009) An information-led process framework for hybrid projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Boudet, H S; Jayasundera, D C and Davis, J (2011) Drivers of conflict in developing country infrastructure projects: Experience from the water and pipeline sectors. Journal of Construction Engineering and Management, 137(7), pp. 498-511. ISSN 0733-9364

Boukamp, F (2006) Modeling of and reasoning about construction specifications to support automated defect detection. PhD thesis, Carnegie Mellon University, USA.

Bourdakis, V (1994) Performance appraisal of sportshall and swimming pool buildings in Greece. PhD thesis, University of Bath, UK.

Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.

Boutilier, R G and Zdziarski, M (2017) Managing stakeholder networks for a social license to build. Construction Management and Economics, 35(8-9), pp. 498-513. ISSN 01446193

Bowen, P; Akintoye, A; Pearl, R and Edwards, P J (2007) Ethical behaviour in the South African construction industry. Construction Management and Economics, 25(6), pp. 631-648. ISSN 1466433X

Bowen, P A (1993) A communication-based approach to price modelling and price forecasting in the design phase of the traditional building procurement process in South Africa. Unpublished PhD thesis, University of Port Elizabeth, South Africa.

Bowen, R M (1978) Valuation of capitalized interest on construction expenditures in the electric utility industry. PhD thesis, Stanford University, USA.

Bower, D A (1995) The creation of a proactive link between time and money. PhD thesis, University of Manchester, UK.

Bowers, C T (2019) The next generation of residential construction: Adoption of green building programs, environmentally certified wood products and the transparency of environmental friendliness. PhD thesis, University of Washington, USA.

Boyd, D (2011) An evaluation of a system change in the purchasing of construction materials by local authorities. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Boyd, D and Fellowes, J (2018) The problem of evaluating 'value for money' of school building programmes. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Boyd, P; Larsen, G D and Schweber, L (2014) Perspectives on the specification of building integrated photovoltaic (BIPV) technology in construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Boyd, P; Larsen, G D and Schweber, L (2015) The co-development of technology and new buildings: Incorporating building integrated photovoltaics. Construction Management and Economics, 33(5-6), pp. 349-360. ISSN 01446193

Boyd, P and Schweber, L (2012) Variations in the mainstreaming of sustainability: A case study approach. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Boyd, P and Schweber, L (2018) Unintended consequences: Institutional artefacts, closure mechanisms and the performance gap. Building Research & Information, 46(1), pp. 10-22. ISSN 0961-3218

Bradley, A; Li, H; Qin, H; Xi, W; Peel, D and Nisbet, N (2022) Requirements and process analysis for ports and waterways openbim ISO standards development. Construction Innovation, 22(4), pp. 705-726. ISSN 1471-4175

Bradley, P E (2019) Methodology for the sequence analysis of building stocks. Building Research & Information, 47(2), pp. 141-155. ISSN 0961-3218

Branco Pedro, J; Meijer, F and Visscher, H (2010) Building control systems of European Union countries: A comparison of tasks and responsibilities. International Journal of Law in the Built Environment, 2(1), pp. 45-59. ISSN 1756-1450

Braz, João Carlos Rocha (2014) Technical and economic evaluation of structural systems to eight floors residential buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.

Brchner, J and Olofsson, T (2012) Construction productivity measures for innovation projects. Journal of Construction Engineering and Management, 138(5), pp. 670-677. ISSN 0733-9364

Bresnen, M J; Bryman, A E; Ford, J R; Beardsworth, A D and Keil, E T (1986) Leader orientation of construction site managers. Journal of Construction Engineering and Management, 112(3), pp. 370-386. ISSN 0733-9364

Bresnen, M J; Ford, J R; Bryman, A E; Keil, E T; Beardsworth, A D and Wray, K (1986) Labour recruitment strategies and selection practices on construction sites. Construction Management and Economics, 4(1), pp. 37-55. ISSN 01446193

Briscoe, G (1982) Recent trends in the construction occupations. Construction Papers, 1(3), pp. 55-63. ISSN 0144-8587

Broadhurst, S J (2000) Non-man-entry sewer renovation robot characteristics. PhD thesis, Sheffield Hallam University, UK.

Brodetskaia, I; Sacks, R and Shapira, A (2013) Stabilizing production flow of interior and finishing works with reentrant flow in building construction. Journal of Construction Engineering and Management, 139(6), pp. 665-674. ISSN 0733-9364

Brooker, P (2011) Towards a code of professional conduct for construction mediators. International Journal of Law in the Built Environment, 3(1), pp. 24-47. ISSN 1756-1450

Brown, B H J (1974) An econometric forecasting model for a segment of the construction market. PhD thesis, Oklahoma State University, USA.

Brown, N; Wright, A J; Shukla, A and Stuart, G (2010) Longitudinal analysis of energy metering data from non-domestic buildings. Building Research & Information, 38(1), pp. 80-91. ISSN 0961-3218

Bröchner, J; Ang, G K I and Fredriksson, G (1999) Sustainability and the performance concept: Encouraging innovative environmental technology in construction. Building Research & Information, 27(6), pp. 367-372. ISSN 0961-3218

Bröchner, J and Silfwerbrand, J (2019) Performance of performance specifications in design-build highway projects. Construction Economics and Building, 19(2), pp. 111-125. ISSN 2204-9029

Bubshait, A A and Cunningham, M J (1998) Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), pp. 315-322. ISSN 0733-9364

Buckman, A H (2016) An exploration of the applications of increased information availability in smart buildings. PhD thesis, University of Sheffield, UK.

Buertey, J T; Dadadzogbor, E and Atsrim, F (2021) Procurement path influencing factors in Ghana: Managing the challenge of cultural shift. International Journal of Construction Management, 21(1), pp. 78-92. ISSN 1562-3599

Buhamdan, S; Duncheva, T and Alwisy, A (2021) Developing a BIM and simulation-based hazard assessment and visualization framework for CLT construction design. Journal of Construction Engineering and Management, 147(3): 04021003, ISSN 0733-9364

Bukhari, Fakhri A (2011) A hierarchical evolutionary algorithmic design (head) system for generating and evolving building design models. PhD thesis, Queensland University of Technology, Australia.

Bulut, M; Wilkinson, S; Khan, A; Jin, X H and Lee, C L (2021) Perceived benefits of retrofitted residential secondary glazing: An exploratory Australian study. International Journal of Building Pathology and Adaptation, 39(5), pp. 720-733. ISSN 23984708

Burgett, J M; Perrenoud, A and Smith, J P (2018) Identification and prioritization of critical subject matter within mechanical systems curriculum in construction management education. International Journal of Construction Education and Research, 14(4), pp. 295-312. ISSN 1557-8771

Burman, E (2016) Assessing the operational performance of educational buildings against design expectations: a case study approach. PhD thesis, University College London, UK.

Burroughs, S (2006) Strength of compacted earth: Linking soil properties to stabilizers. Building Research & Information, 34(1), pp. 55-65. ISSN 0961-3218

Burrows, B G (1989) Organisation and quality of falsework construction: A socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained. PhD thesis, University of Warwick, UK.

Bweupe, A S and Mwiya, B (2024) Quality management in ready-mix concrete production in Zambia. Journal of Construction Business and Management, 7(1), pp. 1-15. ISSN 2521-0165

Cades, A-P (2018) Influence of psychological capital and thinking perspectives on construction safety climate and performance. PhD thesis, Walden University, USA.

Caetano, L F; de Souza, H A and Gomes, A P (2022) Effect of the exposed steel structure on the thermal performance of buildings. Architectural Engineering and Design Management, 18(1), pp. 38-55. ISSN 1745-2007

Cai, H; Kuczek, T; Dunston, P S and Li, S (2017) Correlating intelligent compaction data to in situ soil compaction quality measurements. Journal of Construction Engineering and Management, 143(8): 04017038, ISSN 0733-9364

Cakmak, P I (2022) The stakeholders' perspective on the factors contributing to construction disputes. International Journal of Building Pathology and Adaptation, 40(5), pp. 712-727. ISSN 23984708

Caldwell, Scott A (2024) Empirical decision-making tools as applied to seaports in the industry 4.0 paradigm. PhD thesis, Liverpool John Moores University, UK.

Calvert, J; Price, V; Winch, C; Clarke, L; Sahin-Dikmen, M; Bilodeau, P L and Dionne, E (2026) Climate literacy and labour agency in vocational education and training. Buildings & Cities, 7(1), pp. 378-395. ISSN 2632-6655

Calvert, G S (2021) A multiple defect approach to bridge life cycle modelling. PhD thesis, University of Nottingham, UK.

Candaş, A B (2022) Multipurpose semantic analysis of construction text documentation. PhD thesis, Middle East Technical University, Turkey.

Capace, Brunella (2019) NDT application in transport asset management: Qa/qc performance specifications in pavement construction and maintenance. PhD thesis, Università degli Studi di Catania, Italy.

Cardellino, P; Araneda, C and García Alvarado, R (2018) Interventions in the classroom–the influence of spatial organisation on educational interaction in Uruguay. Architectural Engineering and Design Management, 14(6), pp. 413-426. ISSN 1745-2007

Carmichael, D G and Karantonis, J P (2015) Construction contracts with conversion capability: A way forward. Journal of Financial Management of Property and Construction, 20(2), pp. 132-146. ISSN 1366-4387

Carpenter, W J (2004) Design and construction in architectural education: 1963-2003. PhD thesis, Birmingham City University, UK.

Carr, P G (2000) An investigation of the relationship between personality traits and performance for engineering and architectural professionals providing design services to the building sector of the construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Carrillo, P (1996) Technology transfer on joint venture projects in developing countries. Construction Management and Economics, 14(1), pp. 45-54. ISSN 01446193

Carty, G J (1995) Construction. Journal of Construction Engineering and Management, 121(3), pp. 319-328. ISSN 0733-9364

Cass, N (2018) Energy-related standards and UK speculative office development. Building Research & Information, 46(6), pp. 615-635. ISSN 0961-3218

Castelblanco, G; Fenoaltea, E M; De Marco, A and Chiaia, B (2025) Influence of macroeconomic factors on construction costs: An analysis of project cases. Construction Management and Economics, 43(3), pp. 196-212. ISSN 0144-6193

Castelblanco, G; Narbaev, T; Osei-Kyei, R; Serikbay, D; Mukashev, Y and Guevara, J (2025) Pandemic risks in PPPs: comparative analysis within developing countries. International Journal of Construction Management, 25(4), pp. 456-468. ISSN 1562-3599

Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(1), pp. 81-92. ISSN 1466433X

Celik, T (1989) Improving concrete quality by using an expert system. PhD thesis, Loughborough University, UK.

Celoza, A; De Oliveira, D P and Leite, F (2023) Qualitative analysis of the impact of contracts on information management in AEC projects. Journal of Construction Engineering and Management, 149(3): 04022185, ISSN 0733-9364

Cevallos, O A; Jaramillo, D; Ávila, C and Aldaz, X (2017) Production and quality levels of construction materials in Andean regions: A case study of Chimborazo, Ecuador. Journal of Construction in Developing Countries, 22(1), pp. 115-136. ISSN 1823-6499

Cevikbas, M; Okudan, O and Işık, Z (2024) Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering, Construction and Architectural Management, 31(1), pp. 1-27. ISSN 0969-9988

Chakraborty, B and Das, S (2014) MGNEGRA and water management: Sustainability issues of built forms in rural India. Journal of Construction in Developing Countries, 19(2), pp. 33-50. ISSN 1823-6499

Chambers, M L (2021) Fine particulate air pollution and accident risk: Three essays. PhD thesis, Vanderbilt University, USA.

Champion, R (2005) Acceleration in construction and engineering contracts. PhD thesis, University of London, UK.

Chan, Y K; Huang, C H; Chao Yi, N; Tseng, H H; Lin, C H; Chang, R F and Chan, M H (2026) A study of detection systems for safety guardrails at construction sites: Innovative applications of image processing and perspective correction. Journal of Construction Engineering and Management, 152(4): 04026018, ISSN 0733-9364

Chan, A P C; Ho, D C K and Tam, C M (2001) Design and build project success factors: Multivariate analysis. Journal of Construction Engineering and Management, 127(2), pp. 93-100. ISSN 0733-9364

Chan, A P C; Lai, M K; Tam, C M and Akintoye, A (2001) Analysis of construction cost variation factors. Journal of Financial Management of Property and Construction, 6(1), pp. 51-60. ISSN 1366-4387

Chan, A P C and Yeong, C M (1995) A comparison of strategies for reducing variations. Construction Management and Economics, 13(6), pp. 467-473. ISSN 01446193

Chan, C F P (2001) The development of construction law in singapore. PhD thesis, University of London, UK.

Chan, C T W (2012) The principal factors affecting construction project overhead expenses: An exploratory factor analysis approach. Construction Management and Economics, 30(10), pp. 903-914. ISSN 01446193

Chan, P and Kaka, A (2003) A blue-collar insight into improving construction labour productivity. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Chandra, V and Loosemore, M (2004) Women's self-perception: An inter-sector comparison of construction, legal and nursing professionals. Construction Management and Economics, 22(9), pp. 947-956. ISSN 01446193

Chandrasekara, C M K N K; Weerasinghe, K D N; Pathirana, S and Piyadasa, R U K (2018) Stresses over surface water sources in a human dominated environment: A case study in Hamilton canal, Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 184-197. ISSN 1759-5916

Chang, C Y (2013) A critical review of the application of tce in the interpretation of risk allocation in PPP contracts. Construction Management and Economics, 31(2), pp. 99-103. ISSN 1466433X

Chang, C Y and Ive, G (2007) Reversal of bargaining power in construction projects: Meaning, existence and implications. Construction Management and Economics, 25(8), pp. 845-855. ISSN 1466433X

Chang, C Y and Qian, Y (2015) An econometric analysis of holdup problems in construction projects. Journal of Construction Engineering and Management, 141(6): 04015004, ISSN 0733-9364

Chang, Chen-Yu (2002) An economic interpretation of construction procurement behaviour for the commercial and industrial buildings. PhD thesis, University College London, UK.

Chang, H-P (2010) Relationships among supply chain management, strategic alliances, and organizational performance with implications for the construction industry. PhD thesis, Lynn University, USA.

Chang, L M and Hsie, M (1995) Developing acceptance-sampling methods for quality construction. Journal of Construction Engineering and Management, 121(2), pp. 246-253. ISSN 0733-9364

Chang, W and Xue, C Q L (2021) Government and its aid buildings: The governmental influence on the design and management of China-aided stadium projects after 2000. Architectural Engineering and Design Management, 17(1-2), pp. 36-49. ISSN 1745-2007

Chaphalkar, N and Iyer, K C (2014) Factors influencing decisions on delay claims in construction contracts for Indian scenario. Construction Economics and Building, 14(1), pp. 32-44. ISSN 2204-9029

Chapman, C (2023) Green and grey drainage infrastructure: costs and benefits of reducing surface water flood risk. PhD thesis, University of Oxford, UK.

Charkhakan, M H and Heravi, G (2023) Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(5), pp. 1932-1950. ISSN 0969-9988

Charles, A (2012) Factors affecting the transformation of existing (no-fines concrete) dwellings to low carbon homes. PhD thesis, Glasgow Caledonian University, UK.

Charlson, J (2021) Emerging trends in construction law at the confluence of academia and industry. PhD thesis, University of Wolverhampton, UK.

Charoenngam, C; Coquinco, S T and Hadikusumo, B H W (2003) Web-based application for managing change orders in construction projects. Construction Innovation, 3(4), pp. 197-215. ISSN 1471-4175

Charoenngam, C and Maqsood, T (2001) A qualitative approach in problem solving process tracing of construction site engineers. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction. PhD thesis, George Washington University, USA.

Chau, K W and Wang, Y S (2005) An analyseis of productivity growth in the construction industry: A non-parametric approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chauhan, S S (1999) Dam safety risk assessment modeling with uncertainty analysis. PhD thesis, Utah State University, USA.

Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387

Chelson, D E (2010) The effects of building information modeling on construction site productivity. PhD thesis, University of Maryland, College Park, USA.

Chen, S.; Guan, Z.; Zhang, Z.; Guo, H. and Han, Y. (2026) Impact of construction workers' physical fatigue on unsafe behavior: An ecg-based field experiment study. Journal of Construction Engineering and Management, 152(8): 04026128, ISSN 0733-9364

Chen, D; Zhou, J; Duan, P and Zhang, J (2023) Integrating knowledge management and BIM for safety risk identification of deep foundation pit construction. Engineering, Construction and Architectural Management, 30(8), pp. 3242-3258. ISSN 0969-9988

Chen, G (2023) Enhance collaboration reliability at task level for construction projects using blockchain technology. PhD thesis, North Carolina State University, USA.

Chen, G X; Shan, M; Chan, A P C; Liu, X and Zhao, Y Q (2019) Investigating the causes of delay in grain bin construction projects: The case of China. International Journal of Construction Management, 19(1), pp. 1-14. ISSN 1562-3599

Chen, H L (2009) Model for predicting financial performance of development and construction corporations. Journal of Construction Engineering and Management, 135(11), pp. 1190-1200. ISSN 0733-9364

Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193

Chen, J-H (2003) Litigation prediction model for construction disputes caused by change orders. PhD thesis, University of Wisconsin - Madison, USA.

Chen, L and Mohamed, S (2010) The strategic importance of tacit knowledge management activities in construction. Construction Innovation, 10(2), pp. 138-163. ISSN 1471-4175

Chen, P; Qiang, M and Wang, J N (2009) Project management in the Chinese construction industry: Six-case study. Journal of Construction Engineering and Management, 135(10), pp. 1016-1026. ISSN 0733-9364

Chen, Q; Jin, R and Soboyejo, A (2013) Understanding a contractor's regional variations in safety performance. Journal of Construction Engineering and Management, 139(6), pp. 641-653. ISSN 0733-9364

Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.

Chen, Y; Chen, S; Hu, C; Jin, L and Zheng, X (2020) Novel probabilistic cost estimation model integrating risk allocation and claim in hydropower project. Journal of Construction Engineering and Management, 146(8): 04020092, ISSN 0733-9364

Chen, Yu (2024) Improving information requirements management in complex rail transport projects. PhD thesis, University of Technology Sydney, Australia.

Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.

Cherneff, J M (1990) Knowledge-based interpretation of architectural drawings. PhD thesis, Massachusetts Institute of Technology, USA.

Cheung, E; Chan, A P C and Kajewski, S (2009) Enhancing value for money in public private partnership projects: Findings from a survey conducted in Hong Kong and Australia compared to findings from previous research in the UK. Journal of Financial Management of Property and Construction, 14(1), pp. 7-20. ISSN 1366-4387

Chew, M Y L and De Silva, N (2003) Maintainability problems of wet areas in high-rise residential buildings. Building Research & Information, 31(1), pp. 60-69. ISSN 0961-3218

Chigara, B. and Smallwood, J. (2026) The impact of procurement on construction health and safety (H&S) in Zimbabwe. Journal of Engineering, Design and Technology, 24(4), pp. 943-962. ISSN 1726-0531

Chin, C S (2009) Process capability and performance improvement. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.

Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.

Choi, J O; O'Connor, J T and Kim, T W (2016) Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis. Journal of Construction Engineering and Management, 142(10): 04016055, ISSN 0733-9364

Choi, K (2008) A new decision-support model for innovative contracting strategies through a quantitative analysis on aspects of project performance. PhD thesis, University of California, Berkeley, USA.

Choi, K; Lee, H W; Bae, J and Bilbo, D (2016) Time-cost performance effect of change orders from accelerated contract provisions. Journal of Construction Engineering and Management, 142(3): 04015085, ISSN 0733-9364

Choi, K C (1992) An object-oriented historical cost information base to support concurrent engineering. PhD thesis, University of California, Berkeley, USA.

Chomicka, B A (2013) Drivers and cost implications of quality failures in commercial offices. PhD thesis, Glasgow Caledonian University, UK.

Chondol, T; Panda, A K; Gupta, A K; Agrawal, N and Kaur, A (2021) The role of perception of local government officials on climate change and resilient development: A case of uttarakhand, India. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 184-195. ISSN 1759-5916

Chong, H Y; Zin, R M and Chong, S C (2013) Employing data warehousing for contract administration: E-dispute resolution prototype. Journal of Construction Engineering and Management, 139(6), pp. 611-619. ISSN 0733-9364

Chow, D H C (2005) Effects of future climate change and near-extreme weather on office building in the UK. PhD thesis, University of Manchester, UK.

Chow, L K and Ng, S T (2005) Establishing a quantitaive performance evaluation framework through fuzzy membership functions. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Choy, C F (2011) Revisiting the 'Bon Curve'. Construction Management and Economics, 29(7), pp. 695-712. ISSN 1466433X

Christian, J (2002) An overview of systems utilizing information and communication technologies: Five research case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Christian, J and Hachey, D (1995) Effects of delay times on production rates in construction. Journal of Construction Engineering and Management, 121(1), pp. 20-26. ISSN 0733-9364

Christofferson, J P (1996) Computer-integrated specification information flow through the residential construction process. PhD thesis, Colorado State University, USA.

Christudason, A; Kenna, P and Lujanen, M (2010) Legal challenges in ensuring regular maintenance and repairs of owner-occupied apartment blocks. International Journal of Law in the Built Environment, 2(2), pp. 178-197. ISSN 1756-1450

Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364

Coleman, E; Nooni, I K; Fianko, S K; Dadzie, L; Neequaye, E N; Owusu-Agyemang, J and Ansa-Asare, E O (2020) Assessing contract management as a strategic tool for achieving quality of work in Ghanaian construction industry: A case study of FPMU and MMDAS. Journal of Financial Management of Property and Construction, 25(1), pp. 41-60. ISSN 1366-4387

Comiskey, D and Wilson, K (2020) A performance barrier? Cavity barrier installation in wall envelope makeups. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Connell, A and Mason, J (2015) Isn't all loss consequential? A review of recent case law and its relevance to contractual practices within the built environment. International Journal of Law in the Built Environment, 7(3), pp. 176-194. ISSN 1756-1450

Conroy, G (1997) CONSERV: A methodology for the management of capital projects and concurrent engineering design using knowledge based technology. PhD thesis, Cranfield University, UK.

Cook, S J and English, C (1997) Overspecification of speculative UK commercial office building: An international comparison. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cooke, John Richard (1973) Methods of documentation and administration of building contracts. PhD thesis, University of New South Wales, Australia.

Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants. EngD thesis, Brunel University, UK.

Cooper, T E (1994) A knowledge-based construction claims advisor for the A.I.A. A201 general conditions document. PhD thesis, Auburn University, USA.

Corbett, D I (1997) Quantifying quality in industrial construction. PhD thesis, Pennsylvania State University, USA.

Corbett, P and Rowley, P (1999) The use of bcis elemental cost data by quantity surveyors as part of cost planning techniques: The practitioners' perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Cox, I D; Morris, J P; Rogerson, J H and Jared, G E (1999) A quantitative study of post contract award design changes in construction. Construction Management and Economics, 17(4), pp. 427-439. ISSN 01446193

Cox, R F (1994) Case studies of employee participation programs in construction and their effects on absenteeism. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(1), pp. 91-100. ISSN 01446193

Craig, R W (2000) Controversial aspects of Commonwealth Construction and Engineering Procurement Law. PhD thesis, Loughborough University, UK.

Craighill, A L (2002) Lifecycle assessment and evaluation of construction and demolition waste management. PhD thesis, University of East Anglia, UK.

Crawley, J; Domoney, L; O'Donovan, A; Wingfield, J; Dinu, C; Kinnane, O and O'Sullivan, P (2026) Towards a universal framework for heat pump monitoring at scale. Buildings & Cities, 7(1), pp. 75-91. ISSN 2632-6655

Da Rocha, C G; Kemmer, S L and Meneses, L (2016) Managing customization strategies to reduce workflow variations in house building projects. Journal of Construction Engineering and Management, 142(8): 5016005, ISSN 0733-9364

Da Rocha, C G; Wijayaratna, K; Jong, K and Haller, D (2023) Examining off-site construction from a flow viewpoint. Journal of Construction Engineering and Management, 149(3): 05023001, ISSN 0733-9364

Dada, J O and Jagboro, G O (2007) An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(1), pp. 37-44. ISSN 1366-4387

Dadi, G B (2013) Applying cognitive principles to the delivery of engineering information by different mediums. PhD thesis, University of Kentucky, USA.

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Dair, C M (2000) An evaluation of the UK regulatory system for the redevelopment of contaminated land. PhD thesis, University of Sussex, UK.

Damnjanovic, I (2006) A risk-based approach to modeling life-cycle costs associated with warranty specifications for transportation infrastructure. PhD thesis, University of Texas at Austin, USA.

Damnjanovic, I and Zhang, Z (2008) Risk-based model for valuation of performance-specified pavement maintenance contracts. Journal of Construction Engineering and Management, 134(7), pp. 492-500. ISSN 0733-9364

Damoah, I S (2015) An investigation into the causes and effects of project failure in government projects in developing countries: Ghana as a case study. PhD thesis, Liverpool John Moores University, UK.

Dang, X; Wang, M; Deng, X; Mao, H and He, P (2025) What affects the corporate social responsibility practices of Chinese international contractors considering dynamic interactions? A hybrid structural equation modeling–fuzzy cognitive map approach. Engineering, Construction and Architectural Management, 32(4), pp. 2646-2671. ISSN 0969-9988

Das, M; Cheng, J C P and Law, K H (2015) An ontology-based web service framework for construction supply chain collaboration and management. Engineering, Construction and Architectural Management, 22(5), pp. 551-572. ISSN 0969-9988

Das, R and Nakano, M (2023) A multi-criteria decision-making model using socio-technical attributes for transportation bridge maintenance prioritisation. International Journal of Construction Management, 23(4), pp. 579-585. ISSN 1562-3599

Dash, A (2021) Determinants of evs adoption: A study on green behavior of consumers. Smart and Sustainable Built Environment, 10(1), pp. 125-137. ISSN 2046-6099

Dave, N; Guduru, R; Misra, A K and Sharma, A K (2022) Experimental evaluation of bond behavior in controlled, binary and quaternary concretes developed using scms. Journal of Engineering, Design and Technology, 20(6), pp. 1430-1448. ISSN 1726-0531

Davies, R and Harty, C (2014) Initial use of an idea capture app in a UK construction organisation. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Davila Delgado, J M and Oyedele, L O (2020) BIM data model requirements for asset monitoring and the circular economy. Journal of Engineering, Design and Technology, 18(5), pp. 1269-1285. ISSN 1726-0531

Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193

Dawood, N N (1996) A strategy for a computer-based materials management system for the building industry. Journal of Financial Management of Property and Construction, 1(2), pp. 17-28. ISSN 1366-4387

Dawood, N N and Bates, W (2000) A decision support system specification for out-turn cost and cost escalation in the heavy engineering industry. Engineering, Construction and Architectural Management, 7(4), pp. 330-346. ISSN 0969-9988

Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.

Dağkıran, G (2015) A multi agent risk analysis and sharing platform for international construction projects. PhD thesis, Middle East Technical University, Turkey.

De Cicco, S (2004) Design and development of an information management system for highway construction specifications. PhD thesis, University of Wisconsin - Madison, USA.

De Dear, R; Kim, J; Candido, C and Deuble, M (2015) Adaptive thermal comfort in Australian school classrooms. Building Research & Information, 43(3), pp. 383-398. ISSN 0961-3218

De Jarnette, V; McCarthy, L M; Bennert, T and Guercio, M C (2013) Use of mechanistic-empirical pavement design principles to assign asphalt pavement pay factor adjustments. Journal of Construction Engineering and Management, 139(11): 4013024, ISSN 0733-9364

De Saram, D D (2002) Measuring the quality of contractors' co-ordination activities during the construction process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

De Wilde, P J C J (2004) Computational support for the selection of energy saving building components. PhD thesis, Delft University of Technology, Netherlands.

Dell'Anna, F; Bottero, M; Becchio, C; Corgnati, S P and Mondini, G (2020) Designing a decision support system to evaluate the environmental and extra-economic performances of a nearly zero-energy building. Smart and Sustainable Built Environment, 9(4), pp. 413-442. ISSN 2046-6099

Demirel, H C (2022) Dealing with uncertainty in infrastructure public-private partnership projects. PhD thesis, Delft University of Technology, Netherlands.

Demirel, H Ç; Volker, L; Leendertse, W and Hertogh, M (2019) Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects. Journal of Construction Engineering and Management, 145(11): 04019073, ISSN 0733-9364

Denny, J (2025) Organizing change: A single case study exploring the perceptions of self-determination in high school employees during a building renovation. EdD thesis, Baylor University, USA.

Dent, S and Smallwood, J J (2014) Building economics pre-course student perceptions. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Deshpande, S D (1988) Some facility planning techniques for construction site layouts. PhD thesis, Indian Institute of Technology Delhi, India.

Dhakal, S; Mrawira, D and Rankin, J (2009) Effect of specifications type on the quality of paving contracts in New Brunswick. Journal of Construction Engineering and Management, 135(9), pp. 801-811. ISSN 0733-9364

Diab, A A (2009) Risk management of building services modularisation: Knowledge management perspective. PhD thesis, University of Manchester, UK.

Dias, J L; Silva, A; Chai, C; Gaspar, P L and De Brito, J (2014) Neural networks applied to service life prediction of exterior painted surfaces. Building Research & Information, 42(3), pp. 371-380. ISSN 0961-3218

Diekmann, J E and Nelson, M C (1985) Construction claims: Frequency and severity. Journal of Construction Engineering and Management, 111(1), pp. 74-81. ISSN 0733-9364

Din, A (2020) Accounting for carbon impacts in buildings: a rating procedure. PhD thesis, London Metropolitan University, UK.

Dinesh, C P; Bari, A U; Dissanayake, R P G and Tamura, M (2013) Detecting and assessment of tsunami building damage using high-resolution satellite images with GIS data. International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 132-144. ISSN 1759-5916

Dinh, T H; Dinh, T H and Götze, U (2024) Roadworks design: Study on selection of construction materials in the preliminary design phase based on economic performance. International Journal of Construction Management, 24(5), pp. 503-511. ISSN 1562-3599

Dinis, F A M (2023) Development and validation of BIM-based natural user interfaces for non-geometrical information management. PhD thesis, Universidade do Porto, Portugal.

Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(3), pp. 287-298. ISSN 0969-9988

Do, S T; Nguyen, V T and Nguyen, N H (2023) Relationship networks between variation orders and claims/disputes causes on construction project performance and stakeholder performance. Engineering, Construction and Architectural Management, 30(9), pp. 3817-3839. ISSN 0969-9988

Dobraszczyk, P A (2006) Into the belly of the beast: Exploring London's main drainage system, c.1848-1868. PhD thesis, University of Reading, UK.

Doherty, M M (2022) Exploring the expansion of planners' engagement capabilities via accessing the data from a building information model for public consultation. PhD thesis, Northumbria University, UK.

Doloi, H (2010) Benchmarking a new design management system using process simulation approach. Construction Innovation, 10(1), pp. 42-59. ISSN 1471-4175

Donohoe S, C J (2013) Enforceability of exemption clauses in construction contracts: A comparative study of approaches in England and Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Donyavi, S; Flanagan, R; Assadi-Langroudi, A and Parisi, L (2024) Understanding the complexity of materials procurement in construction projects to build a conceptual framework influencing supply chain management of msmes. International Journal of Construction Management, 24(2), pp. 177-186. ISSN 1562-3599

Dosumu, O; Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), pp. 11-23. ISSN 2521-0165

Dosumu, O S (2018) Perceived effects of prevalent errors in contract documents on construction projects. Construction Economics and Building, 18(1), pp. 1-26. ISSN 2204-9029

Downey, M (2014) Selection and adoption of low and zero carbon technologies in social housing: a socio-technical network approach. PhD thesis, University of Reading, UK.

Dozzi, S P; Abourizk, S M and Schroeder, S L (1996) Utility-theory model for bid markup decisions. Journal of Construction Engineering and Management, 122(2), pp. 119-124. ISSN 0733-9364

Draleti, G; Sengonzi, R and Kakitahi, J (2024) Improvement of risk management in cost estimation in the building construction industry in Uganda. Journal of Construction in Developing Countries, 29(1), pp. 111-138. ISSN 1823-6499

Du, J; El-Gafy, M and Zhao, D (2016) Optimization of change order management process with object-oriented discrete event simulation: Case study. Journal of Construction Engineering and Management, 142(4): 05015018, ISSN 0733-9364

Duarte, J P and Correia, R (2006) Implementing a description grammar: Generating housing programs online. Construction Innovation, 6(4), pp. 203-216. ISSN 1471-4175

Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.

Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364

Duksh, Y S; Kaushik, B K; Sarkar, S and Singh, R (2013) Analysis of propagation delay and power with variation in driver size and number of shells in multi walled carbon nanotube interconnects. Journal of Engineering, Design and Technology, 11(1), pp. 19-33. ISSN 1726-0531

Dunston, P S and Reed, A G (2000) Benefits of small projects team initiative. Journal of Construction Engineering and Management, 126(1), pp. 22-28. ISSN 0733-9364

Dursun, O and Stoy, C (2012) Determinants of construction duration for building projects in Germany. Engineering, Construction and Architectural Management, 19(4), pp. 444-468. ISSN 0969-9988

Duvel, C S (1999) Establishing rule-based models to implement workflow within construction organizations. PhD thesis, University of Florida, USA.

Duzkale, A K and Lucko, G (2016) Exposing uncertainty in bid preparation of steel construction cost estimating: I. Conceptual framework and qualitative C-I-V-I-L classification. Journal of Construction Engineering and Management, 142(10): 04016049, ISSN 0733-9364

Eaglestone, F N (1993) An improved method of requesting insurance under UK construction contracts. PhD thesis, City, University of London, UK.

Eamon, C; Shinki, K; Wong, K H and Alsendi, A (2025) Assessment of pay item specific case-based reasoning approach for bridge unit cost estimation. Journal of Construction Engineering and Management, 151(12): 04025188, ISSN 0733-9364

Easa, S M (1987) Earthwork allocations with nonconstant unit costs. Journal of Construction Engineering and Management, 113(1), pp. 34-50. ISSN 0733-9364

Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364

Easa, S M and Can, E K (1985) Optimization model for aggregate blending. Journal of Construction Engineering and Management, 111(3), pp. 216-230. ISSN 0733-9364

Easa, S M and Can, E K (1985) Stochastic priority model for aggregate blending. Journal of Construction Engineering and Management, 111(4), pp. 358-373. ISSN 0733-9364

Echeverry, D; Ibbs, C W and Burati, J (1988) Graduated unit price payment schedules. Journal of Construction Engineering and Management, 114(1), pp. 1-18. ISSN 0733-9364

Edike, U E (2023) Material management practices and factors influencing material conservation on construction sites in Nigeria. Journal of Engineering, Design and Technology, 21(4), pp. 1197-1211. ISSN 1726-0531

Edirisinghe, R and Jadhav, A (2017) Is the smart safety vest a brutal innovation? Evaluation of microclimate performance using a thermal manikin. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Egger, H S (1986) Business techniques and skills utilized by small residential contractors with one to four employees in six high growth areas of Texas. EdD thesis, Texas A&M University, USA.

Egwunatum, S I; Anumudu, A C; Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(1), pp. 354-382. ISSN 0969-9988

Ekemode, B G (2020) Impact of urban regeneration on commercial property values in Osogbo, Osun State, Nigeria. Smart and Sustainable Built Environment, 9(4), pp. 557-571. ISSN 2046-6099

Eken, G (2022) Using natural language processing for automated construction contract review during risk assessment at the bidding stage. PhD thesis, Middle East Technical University, Turkey.

Ekung, S; Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: A multivariate analysis. African Journal of Built Environment Research, 5(1), pp. 19-40. ISSN 2414-0236

Ekung, S; Opoku, A and Okonkwo, C (2023) Organisational learning and sustainability of service-based firms: A canonical correlation analysis. International Journal of Construction Management, 23(13), pp. 2160-2170. ISSN 1562-3599

El Tayeh, A (2008) Social web-based systems for supporting geographically dispersed project teams in the architecture-engineering-construction industry. PhD thesis, University of Manchester, UK.

El-Adaway, I H; Abotaleb, I S; Eid, M S; May, S; Netherton, L and Vest, J (2018) Contract administration guidelines for public infrastructure projects in the United States and Saudi Arabia: Comparative analysis approach. Journal of Construction Engineering and Management, 144(6): 04018031, ISSN 0733-9364

El-Adaway, I H and Kandil, A A (2010) Multiagent system for construction dispute resolution (MAS-COR). Journal of Construction Engineering and Management, 136(3), pp. 303-315. ISSN 0733-9364

El-Dabaa, R and Abdelmohsen, S (2023) Integrating performance indicators in the production rules of shape-shifting grammars for architectural adaptive façade systems. Architectural Engineering and Design Management, 19(4), pp. 419-437. ISSN 1745-2007

El-Kelesh, A M and Hassan, D A (2023) Impact of ground conditions and excavation depth on selection of excavation support system. International Journal of Construction Management, 23(15), pp. 2539-2550. ISSN 1562-3599

El-Razek, M E A; Bassioni, H and El-Salam, W A (2007) Investigation into the causes of claims in Egyptian building construction. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

El-Shahhat, A M (1993) Safety of concrete high-rise buildings during construction. PhD thesis, Purdue University, USA.

El-Sharkawy, A R (1993) Pricing construction contracts under inflation. PhD thesis, North Carolina State University, USA.

Elazouni, A and Salem, O A (2011) Progress monitoring of construction projects using pattern recognition techniques. Construction Management and Economics, 29(4), pp. 355-370. ISSN 1466433X

Elazouni, A M and Basha, I M (1996) Evaluating the performance of construction equipment operators in Egypt. Journal of Construction Engineering and Management, 122(2), pp. 109-114. ISSN 0733-9364

Elgrari, O (2011) The role of technology transfer in improving manpower capability in private house building companies in Libya. PhD thesis, University of Salford, UK.

Elhag, T; Eapen, S and Ballal, T (2020) Moderating claims and disputes through collaborative procurement. Construction Innovation, 20(1), pp. 79-95. ISSN 1471-4175

Elhegazy, H; Ebid, A; Mahdi, I; Haggag, S and Abdul-Rashied, I (2021) Implementing QFD in decision making for selecting the optimal structural system for buildings. Construction Innovation, 21(2), pp. 345-360. ISSN 1471-4175

Ellis, L; Martin, H and Ramcharitar, S (2019) Factors influencing triple constraints in public sector projects in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 157-169. ISSN 17514304

Elmisalami, T E (2001) Developing a multi-attribute utility model (MAUM) for selecting information technologies in the construction industry. PhD thesis, Iowa State University, USA.

Elmualim, A A and Govender, K (2008) Communities of practice in UK large contracting firms: Contrasting application and non-utilized merits. Architectural Engineering and Design Management, 4(3-4), pp. 149-159. ISSN 1745-2007

Elnady, Ahmed Abdelrady Okasha Mohamed (2023) An integrated framework for balancing contractor's workload versus capacity using system dynamics. PhD thesis, University of Alberta, Canada.

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.

Emmitt, S (1997) The diffusion of innovations in the building industry. PhD thesis, University of Manchester, UK.

Emmitt, S (2001) Technological gatekeepers: The management of trade literature by design offices. Engineering, Construction and Architectural Management, 8(1), pp. 2-8. ISSN 0969-9988

Emmitt, S (2006) Selection and specification of building products: Implications for design managers. Architectural Engineering and Design Management, 2(3), pp. 176-186. ISSN 1745-2007

Emmitt, S and Heaton, B (2003) The introduction of Approved Document L: A study of enforced change. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Emuze, F and Smallwood, J J (2012) Perspectives on health and safety in construction and design. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 27-34. ISSN 17514312

Ensafi, Mahnaz (2022) Work order prioritization using neural networks to improve building operation. PhD thesis, Virginia Tech, USA.

Enshassi, A; Arain, F M and Tayeh, B (2010) Subcontractor prequalification practices in Palestine. International Journal of Construction Management, 10(4), pp. 45-74. ISSN 1562-3599

Enshassi, A; Ayash, A and Mohamed, S (2019) Energy management application in construction projects in the Gaza Strip, Palestine. Journal of Construction in Developing Countries, 24(1), pp. 1-21. ISSN 1823-6499

Enshassi, A; Mohamed, S and Abdel-Hadi, M (2013) Factors affecting the accuracy of pre-tender cost estimates in the Gaza Strip. Journal of Construction in Developing Countries, 18(1), pp. 73-94. ISSN 1823-6499

Enshassi, A; Mohamed, S and El-Ghandour, S (2009) Problems associated with the process of claim management in Palestine: Contractors' perspective. Engineering, Construction and Architectural Management, 16(1), pp. 61-72. ISSN 0969-9988

Enshassi, A A; Arain, F and El-Rayyes, Y (2014) Post-evaluation system in construction projects in Gaza Strip-Palestine. Journal of Construction in Developing Countries, 19(2), pp. 51-73. ISSN 1823-6499

Erbas, I (2013) Construction management project delivery system as a form of project implementation in Turkish public procurement. PhD thesis, Istanbul Technical University, Turkey.

Erbatur, O C (2012) A methodology for estimating construction unit bid prices. DEng thesis, Texas A&M University, USA.

Eriksson, P E and Pesämaa, O (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(8), pp. 893-901. ISSN 1466433X

Erişen, S (2021) Incremental transformation of spatial intelligence from smart systems to sensorial infrastructures. Building Research & Information, 49(1), pp. 113-126. ISSN 0961-3218

Espinoza, R D (2011) Contingency estimating using option pricing theory: Closing the gap between theory and practice. Construction Management and Economics, 29(9), pp. 913-927. ISSN 1466433X

Eufrasio Espinosa, R M (2015) A visio-spatial life cycle energy model of building materials within a bioregional context: Mapping the embodied energy of fired clay bricks in Cuitzeo, Mexico. PhD thesis, University of Sheffield, UK.

Evans, M (2013) An investigation into occupants' satisfaction in UK sustainable social housing. PhD thesis, University of the West of England, Bristol, UK.

Eze, E C; Aghimien, D O; Aigbavboa, C O and Sofolahan, O (2024) Building information modelling adoption for construction waste reduction in the construction industry of a developing country. Engineering, Construction and Architectural Management, 31(6), pp. 2205-2223. ISSN 0969-9988

Eze, E C; Sofolahan, O; Ugulu, R A and Ameyaw Effah, E E (2025) Bolstering circular economy in construction through digitalisation. Construction Innovation, 25(6), pp. 1774-1796. ISSN 1471-4175

Ezeokoli, N B; Komolafe, T B and Olukolajo, M A (2019) Macroeconomic fluctuations and event centres' return dynamics in akure commercial property market, Nigeria. African Journal of Built Environment Research, 3(1), pp. 29-40. ISSN 2414-0236

Fagbenle, O I; Adeyemi, A Y and Adesanya, D A (2004) The impact of non-financial incentives on bricklayers' productivity in Nigeria. Construction Management and Economics, 22(9), pp. 899-911. ISSN 01446193

Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.

Famiyeh, S; Amoatey, C T; Adaku, E and Agbenohevi, C S (2017) Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana. Journal of Engineering, Design and Technology, 15(2), pp. 181-198.

Fan, C; Binchao, D and Yin, Y (2023) Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: An integrated ISM–MICMAC approach. Engineering, Construction and Architectural Management, 30(7), pp. 2991-3013. ISSN 0969-9988

Farbarik, J J (1994) Evaluation of the efficacy of using bid data to predict construction cost overruns. PhD thesis, University of Washington, USA.

Fares, A; Elazouni, A and Al-Alawi, M (2025) Using game theory to negotiate win-win payment terms between contractors and subcontractors. Journal of Construction Engineering and Management, 151(5): 04025023, ISSN 0733-9364

Farmer, H K (2003) Managing maintenance of multiple domestic accommodation. PhD thesis, Loughborough University, UK.

Fathi, M S (2009) Micro- and macro-level context-aware information delivery for construction programme managers. PhD thesis, Loughborough University, UK.

Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.

Faubel, C.; Mowen, D.; Miri, M.; Demarquet Alban, U.; Martinez-Molina, A. and Alamaniotis, M. (2026) Multimodal transformer models for real-time estimation of indoor environmental quality in educational settings. Smart and Sustainable Built Environment, pp. 1-37. ISSN 2046-6099

Fauth, J; Nørkjær Gade, P; Kaiser, S; Raj, K; Goul Pedersen, J; Olsson, P O; Nisbet, N; Mastrolembo Ventura, S; Hirvensalo, A; Granja, J; Urban, H; Rutešić, S; Verstraeten, R; Raitviir, C R; Kallinen, A R; Schranz, C; Stojanov, T and Tekavec, J (2025) Investigating building permit processes across Europe: Characteristics and patterns. Building Research & Information, 53(4), pp. 417-434. ISSN 0961-3218

Favie, R (2010) Quality monitoring in infrastructural design-build projects: the analysis of an audit-based monitoring system. PhD thesis, Eindhoven University of Technology, Netherlands.

Fawcett, T and Killip, G (2014) Anatomy of low carbon retrofits: Evidence from owner-occupied superhomes. Building Research & Information, 42(4), pp. 434-445. ISSN 0961-3218

Fazeli, A; Banihashemi, S; Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: The resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(5), pp. 1896-1922. ISSN 0969-9988

Fazlipour, M and Samadzad, M (2026) Engineering and economic feasibility of a new prefabrication ecosystem for steel construction in diverse low-rise residential buildings. Journal of Construction Engineering and Management, 152(2): 04025238, ISSN 0733-9364

Feng, P P-Y (2009) Causes and effects of rework on the delivery of healthcare facilities in California. PhD thesis, University of California, Berkeley, USA.

Ferreira, Sérgio Leal (2005) Proposal of IFC model extension with ies LM-63 contribution: Luminaire in building lifecycle. PhD thesis, Universidade de São Paulo, Brazil.

Few, J F M (2021) Ventilation in occupied homes: measurement, performance and sociotechnical perspectives. PhD thesis, University College London, UK.

Fieldson, R (2017) The afterlife clause; towards a strategy for improved adaptation in retail property. International Journal of Building Pathology and Adaptation, 35(4), pp. 364-379.

Figliola, A (2023) Digital workflow for climate resilient building façade generation. Building Research & Information, 51(3), pp. 257-278. ISSN 0961-3218

Finegan, E; Kelly, G and O’Sullivan, G (2020) Comparative analysis of passivhaus simulated and measured overheating frequency in a typical dwelling in Ireland. Building Research & Information, 48(6), pp. 681-699. ISSN 0961-3218

Finke, M R (1998) A better way to estimate and mitigate disruption. Journal of Construction Engineering and Management, 124(6), pp. 490-497. ISSN 0733-9364

Finnie, D (2013) Comparison of time adjustment clauses between DZ3910, AS4000 and STCC. Construction Economics and Building, 13(1), pp. 66-84. ISSN 2204-9029

Finnie, D; Ali, N A and Park, K (2019) Design development post contract signing in New Zealand: Client's or contractor's cost? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 146-156. ISSN 17514304

Fiona, T S C (2009) A critical study on performance-based fire safety design in Hong Kong with timber perforated ceilings as an example. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Fiorineschi, L; Papini, S; Pugi, L; Rindi, A and Rotini, F (2020) Systematic design of a new gearbox for concrete mixers. Journal of Engineering, Design and Technology, 18(6), pp. 2017-2042. ISSN 1726-0531

Fisher, D J; O'Neill, M W and Contreras, J C (1995) DS^2: Drilled shaft decision support system. Journal of Construction Engineering and Management, 121(1), pp. 86-94. ISSN 0733-9364

Fitchett, A S (2009) Skills development and employment creation through small public buildings in South Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Fletcher, S L (2001) Developing disassembly strategies for buildings to reduce the lifetime environmental impacts by applying a systems approach. PhD thesis, University of Sheffield, UK.

Flynn, C (2020) Risk transfer in operational public private partnerships in the education sector. PhD thesis, Queen's University Belfast, UK.

Forcada, N; MacArulla, M; Gangolells, M and Casals, M (2014) Assessment of construction defects in residential buildings in Spain. Building Research & Information, 42(5), pp. 629-640. ISSN 0961-3218

Foroughi Sabzevar, M (2022) An AR-QR code approach to improve access of crews to design and construction information on construction sites. PhD thesis, Drexel University, USA.

Foster, R D (1982) Does pictorial documentation improve construction cost control? PhD thesis, Texas A&M University, USA.

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Franks, M S (2024) Managing complexity and uncertainty in megaprojects: A case study of Fort Friendly’s transformational megaprogram. DBA thesis, National University, USA.

França, A J G L and Ornstein, S W (2022) The role of the built environment in updating design requirements in the post-pandemic scenario: A case study of selected diagnostic facilities in Brazil. Architectural Engineering and Design Management, 18(5), pp. 671-689. ISSN 1745-2007

França, Ana Judite Galbiatti Limongi (2016) Continuous improvement applied to standardized typology of buildings: Knowledge management in the context of the asset portfolio. PhD thesis, Universidade de São Paulo, Brazil.

Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts. PhD thesis, Iowa State University, USA.

Galbraith, G H; Guo, J S and McLean, R C (2000) The effect of temperature on the moisture permeability of building materials. Building Research & Information, 28(4), pp. 245-259. ISSN 0961-3218

Gamil, Y and Abdul Rahman, I (2023) Impact of poor communication on dispute occurrence in the construction industry: A preliminary exploratory study of Yemen construction industry. International Journal of Construction Management, 23(16), pp. 2729-2735. ISSN 1562-3599

Gan, V J L (2022) BIM-based building geometric modeling and automatic generative design for sustainable offsite construction. Journal of Construction Engineering and Management, 148(10): 04022111, ISSN 0733-9364

Gao, Y; Gan, Y; Chen, Y and Chen, Y (2025) Application of large language models to intelligently analyze long construction contract texts. Construction Management and Economics, 43(3), pp. 226-242. ISSN 0144-6193

Gao, Z; Walters, R C; Jaselskis, E J and Wipf, T J (2006) Approaches to improving the quality of construction drawings from owner's perspective. Journal of Construction Engineering and Management, 132(11), pp. 1187-1192. ISSN 0733-9364

Garay, A; Ruiz, A and Guevara, J (2022) Dynamic evaluation of thermal comfort scenarios in a colombian large-scale social housing project. Engineering, Construction and Architectural Management, 29(5), pp. 1909-1930. ISSN 0969-9988

Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.

Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364

García-León, R A; Quintero-Quintero, W and Rodriguez-Castilla, M (2020) Thermal analysis of three motorcycle disc brakes. Smart and Sustainable Built Environment, 9(2), pp. 208-226. ISSN 2046-6099

Gatley, D (2004) A critical examination of building contracts in New Zealand: an investigation into the types of building contracts employed ; their formation and administration ; and into the incidence, nature and resolution of disputes resulting from their usage ; in the commercial and residential sectors of the construction industry in New Zealand. PhD thesis, RMIT University, Australia.

Gaur, S and Tawalare, A (2024) Assessing the implications of BIM on sustainability of construction projects through design risk management. Built Environment Project and Asset Management, 14(3), pp. 470-489. ISSN 2044-124X

Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.

Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364

Geng, L; Herath, N; Hui, F K P; Liu, X; Duffield, C and Zhang, L (2023) Evaluating uncertainties to deliver enhanced service performance in education PPPs: A hierarchical reliability framework. Engineering, Construction and Architectural Management, 30(9), pp. 4464-4485. ISSN 0969-9988

Georgiou, A; Haritos, G; Fowler, M and Imani, Y (2016) Advanced phase powertrain design attribute and technology value mapping. Journal of Engineering, Design and Technology, 14(1), pp. 115-133.

Georgiou, J (2013) Workmanship and defects in housing in the state of Victoria, Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Gerber, B and Ekenel, M (2013) Building code requirements for inspection of adhesive anchors in concrete. Journal of Construction Engineering and Management, 139(10): 06013001, ISSN 0733-9364

Ghafoori, M and Abdallah, M (2025) Multi-criteria decision support model for material and supplier selection in the construction industry. International Journal of Construction Management, 25(4), pp. 409-418. ISSN 1562-3599

Ghannad, P and Lee, Y C (2023) Optimizing modularization of residential housing designs for rapid postdisaster mass production of housing. Journal of Construction Engineering and Management, 149(7): 04023046, ISSN 0733-9364

Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.

Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.

Ghodki, M K (2024) A new solar powered robotic arm guided master–slave electric motors of biomass conveyor. Journal of Engineering, Design and Technology, 22(3), pp. 739-762. ISSN 1726-0531

Ghosh, S; Dickerson, D E and Mills, T (2019) Effect of the Last Planner system® on social interactions among project participants. International Journal of Construction Education and Research, 15(2), pp. 100-117. ISSN 1557-8771

Gidado, K (1993) Numerical index of complexity in building construction with particular consideration to its effect on production time. PhD thesis, University of Brighton, UK.

Gilmour, T; Wiesel, I; Pinnegar, S and Loosemore, M (2010) Social infrastructure partnerships: A firm rock in a storm? Journal of Financial Management of Property and Construction, 15(3), pp. 247-259. ISSN 1366-4387

Gines, J A (2024) Mass timber utilization in architecture: Carbon sequestration, building materials and construction practices. PhD thesis, Mississippi State University, USA.

Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Thomson, R (2023) Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(10), pp. 820-839. ISSN 01446193

Ginigaddara, Buddhini (2022) Developing a skill profile prediction model for typologies of offsite construction. PhD thesis, Western Sydney University, Australia.

Giorgi, Serena (2020) Circular economy and regeneration of building stock: Policy improvements, strategic partnerships and life cycle decision-making tools. PhD thesis, Politecnico di Milano, Italy.

Glass, J (2005) A best practice process model for hybrid concrete construction. Construction Management and Economics, 23(2), pp. 169-184. ISSN 01446193

Gleeson, C P (2016) Residential heat pump installations: The role of vocational education and training. Building Research & Information, 44(4), pp. 394-406. ISSN 0961-3218

Godoy-Shimizu, D; Armitage, P; Steemers, K and Chenvidyakarn, T (2011) Using display energy certificates to quantify schools' energy consumption. Building Research & Information, 39(6), pp. 535-552. ISSN 0961-3218

Golizadeh, H and Namini, S B (2015) Predicting the significant characteristics of concrete containing palm oil fuel ash. Journal of Construction in Developing Countries, 20(1), pp. 85-98. ISSN 1823-6499

Gomez, C and Gambo, M (2016) Evaluation of special purpose vehicle organisation skill sets taxonomy for effective public-private partnership infrastructure project delivery. Journal of Construction in Developing Countries, 21(1), pp. 147-165. ISSN 1823-6499

Goncikowski, M (2024) Research by design: determining the form of the initial architectural concept of a skyscraper building in warsaw. Architectural Engineering and Design Management, 20(1), pp. 1-31. ISSN 1745-2007

Gong, X (2019) Vertical integration and reputation: the case of real estate companies. PhD thesis, University of Hong Kong, Hong Kong.

Goodchild, B and Beatty, C (2000) Assessing the procurement practices of housing associations: A case study of new build in Scotland. Journal of Construction Procurement, 6(1), pp. 20-32. ISSN 1358-9180

Goodhew, S; Bird, P and Paterson, I (1997) The financial implications of using natural ventilation to reduce the levels of radon gas within an existing 'period' dwelling. Journal of Financial Management of Property and Construction, 2(2), pp. 85-104. ISSN 1366-4387

Gordon, C M (1994) Choosing appropriate construction contracting method. Journal of Construction Engineering and Management, 120(1), pp. 196-210. ISSN 0733-9364

Gorgolewski, M (2008) Designing with reused building components: Some challenges. Building Research & Information, 36(2), pp. 175-188. ISSN 0961-3218

Gorse, C; Glew, D; Miles-Shenton, D and Farmer, D (2015) Addressing the thermal performance gap: Possible performance control tools for the construction manager. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Gorse, C; Stafford, A; Shenton, D M; Johnston, D; Sutton, R and Farmer, D (2012) Thermal performance of buildings and the management process. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Gorse, C; Sutton, R; Johnston, D and Miles-Shenton, D (2011) Heat loss through the building fabric: Low carbon construction practice. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Gosling, J; Pero, M; Schoenwitz, M; Towill, D and Cigolini, R (2016) Defining and categorizing modules in building projects: An international perspective. Journal of Construction Engineering and Management, 142(11): 04016062, ISSN 0733-9364

Goulias, D (1992) Quality assurance and specifications. PhD thesis, University of Texas at Austin, USA.

Govender, N; Laryea, S and Watermeyer, R (2024) Conceptual research methodology to investigate the relationship between fees and quality of professional service outputs. Journal of Engineering, Design and Technology, 22(4), pp. 1185-1205. ISSN 1726-0531

Grady, K (1980) The provision of public buildings in the West Riding of Yorkshire, c.1600-1840. PhD thesis, University of Leeds, UK.

Graham, S (2005) Sustainable building design: A systematic approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Gram-Hanssen, K (2010) Residential heat comfort practices: Understanding users. Building Research & Information, 38(2), pp. 175-186. ISSN 0961-3218

Gram-Hanssen, K (2014) New needs for better understanding of household's energy consumption: behaviour, lifestyle or practices? Architectural Engineering and Design Management, 10(1-2), pp. 91-107. ISSN 1745-2007

Gransberg, D D and Molenaar, K (2003) A synthesis of design-builder selection methods for public infrastructure projects. Journal of Construction Procurement, 9(2), pp. 40-51. ISSN 1358-9180

Greenwood, D J and Shaglouf, A A (1997) Comparison between planned and actual durations in medium sized building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Greenwood, J P (2007) An examination of the performance based building code on the design of a commercial building. Construction Economics and Building, 7(1), pp. 37-44. ISSN 2204-9029

Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.

Griffiths, G (1999) Construction procurement arrangements of housing associations in liverpool. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Grimm, C T (1994) Void mortar joints: Bane of brick masonry. Journal of Construction Engineering and Management, 120(1), pp. 152-161. ISSN 0733-9364

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.

Gruneberg, S and Folwell, K (2013) The use of gross fixed capital formation as a measure of construction output. Construction Management and Economics, 31(4), pp. 359-368. ISSN 1466433X

Gu, T.; Hu, J.; Song, X.; Yan, H. and Chen, Z. (2026) How to enhance the urban community resilience from the perspective of social networks? A case study of xuzhou, China. Engineering, Construction and Architectural Management, 33(7), pp. 5340-5363. ISSN 0969-9988

Guerra-Santin, O and Itard, L (2010) Occupants' behaviour: Determinants and effects on residential heating consumption. Building Research & Information, 38(3), pp. 318-338. ISSN 0961-3218

Gunarathna, C; Yang, R J; Jayasuriya, S; Yi, X; Arashpour, M; Ning, X and Heng, X (2026) Design and development of blockchain-enabled information management system for building integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(15), pp. 72-114. ISSN 0969-9988

Gunduz, M (2002) Change orders impact assessment for labor intensive construction. PhD thesis, University of Wisconsin - Madison, USA.

Gunning, J G (1999) A review of the application of risk assessment procedures in construction management and research. Journal of Financial Management of Property and Construction, 4(1), pp. 59-74. ISSN 1366-4387

Guo, K; Minchin, E and Ferragut, T (2005) The shift to warranties and performance specifications: What of method specifications? Construction Management and Economics, 23(9), pp. 953-963. ISSN 01446193

Guo, S; Tang, B; Liang, K; Zhou, X and Li, J (2021) Comparative analysis of the patterns of unsafe behaviors in accidents between building construction and urban railway construction. Journal of Construction Engineering and Management, 147(5): 04021027, ISSN 0733-9364

Gurevich, U; Sacks, R and Shrestha, P (2017) BIM adoption by public facility agencies: Impacts on occupant value. Building Research & Information, 45(6), pp. 610-630. ISSN 0961-3218

Gurmu, A and Miri, M P (2025) Machine learning regression for estimating the cost range of building projects. Construction Innovation, 25(2), pp. 577-593. ISSN 1471-4175

Gutierrez-Bucheli, L.; Muñoz, S.; Couper, R. and Maxwell, D. W. (2026) Mapping the landscape of productivity in construction research: An umbrella review of trends, gaps and future directions. Engineering, Construction and Architectural Management, 33(15), pp. 516-539. ISSN 0969-9988

Guven, G and Ergen, E (2013) Factors affecting the selection of data storage approach in radio frequency identification applications. Construction Innovation, 13(1), pp. 117-138. ISSN 1471-4175

Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.

Götze, V; Gerber, J D and Jehling, M (2024) Mapping municipal land policies: Applications of flexible zoning for densification. Buildings & Cities, 5(1), pp. 506-520. ISSN 2632-6655

Günhan, S and Arditi, D (2007) Budgeting owner's construction contingency. Journal of Construction Engineering and Management, 133(7), pp. 492-497. ISSN 0733-9364

H M, C S (2018) Impact of construction practices on sustainable environment: a study at Bangalore. PhD thesis, Shri Jagdishprasad Jhabarmal Tibarewala University, India.

Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.

Hacker, M E; Kaminsky, J; Faust, K M and Rauch, S (2020) Regulatory enforcement approaches for mass population displacement. Journal of Construction Engineering and Management, 146(5): 1820, ISSN 0733-9364

Hadavi, A (1991) Improvement in construction productivity through goal setting in a unionized environment. PhD thesis, Northwestern University, USA.

Hadikusumo, B H W and Tobgay, S (2015) Construction claim types and causes for a large-scale hydropower project in Bhutan. Journal of Construction in Developing Countries, 20(1), pp. 49-63. ISSN 1823-6499

Hadizadeh-Bazaz, M.; Navarro, I. J. and Yepes, V. (2026) Smart integration of non-destructive damage detection and life-cycle assessment for sustainable maintenance of coastal bridges. Smart and Sustainable Built Environment, pp. 1-27. ISSN 2046-6099

Haga, Heitor Cesar Riogi (2008) Production and sales sectors of materials in the house construction production chain: Diagnosis for the development of technological foresight studies. PhD thesis, Universidade de São Paulo, Brazil.

Hairstans, R (2007) Optimisation of timber platform frame construction. PhD thesis, Edinburgh Napier University, UK.

Hajibabai, L; Aziz, Z and Peña-Mora, F (2011) Visualizing greenhouse gas emissions from construction activities. Construction Innovation, 11(3), pp. 356-370. ISSN 1471-4175

Hajjar, D and Abourizk, S M (1998) Modeling and analysis of aggregate production operations. Journal of Construction Engineering and Management, 124(5), pp. 390-401. ISSN 0733-9364

Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.

Haksever, A M (1998) Information overload in construction project management. PhD thesis, University of Reading, UK.

Halaweh, M M (2012) System management of construction projects based on industrial engineering prespective with impact on net profit. PhD thesis, State University of New York at Binghamton, USA.

Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007

Hallowell, M and Toole, T M (2009) Contemporary design-bid-build model. Journal of Construction Engineering and Management, 135(6), pp. 540-549. ISSN 0733-9364

Hallowell, M R and Gambatese, J A (2010) Qualitative research: Application of the Delphi method to CEM research. Journal of Construction Engineering and Management, 136(1), pp. 99-107. ISSN 0733-9364

Haltenhoff, C E (1987) Construction management performance under dual services agreements. Journal of Construction Engineering and Management, 113(4), pp. 640-647. ISSN 0733-9364

Hamdan, Azreen Sharina (2025) Developing a tailored framework for digital transformation in UK small, micro and medium construction enterprises: Evidence from greater manchester. PhD thesis, University of Salford, UK.

Hamiani, A (1987) Consite: A knowledge-based expert system framework for construction site layout. PhD thesis, University of Texas at Austin, USA.

Hamida, M B; Hassanain, M A and Al-Hammad, A M (2022) Review and assessment of factors affecting adaptive reuse of commercial projects in Saudi Arabia. International Journal of Building Pathology and Adaptation, 40(1), pp. 1-19. ISSN 23984708

Hamidane, H; Ababneh, A; Messabhia, A and Xi, Y (2020) Modeling of chloride penetration in concrete structures under freeze-thaw cycles. International Journal of Building Pathology and Adaptation, 38(1), pp. 127-147. ISSN 23984708

Hamilton, I G; Summerfield, A J; Lowe, R; Ruyssevelt, P; Elwell, C A and Oreszczyn, T (2013) Energy epidemiology: A new approach to end-use energy demand research. Building Research & Information, 41(4), pp. 482-497. ISSN 0961-3218

Hamilton-MacLaren, F; Loveday, D and Mourshed, M (2009) The calculation of embodied energy in new build UK housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Hammad, Mohammed (2018) Estimating, allocating and managing schedule and cost contingency in construction projects. PhD thesis, University of New South Wales, Australia.

Hampton, D; Jin, J S and Clark, E A (1990) Foundation construction within wastewater-treatment plant. Journal of Construction Engineering and Management, 116(4), pp. 564-573. ISSN 0733-9364

Han, F (2021) Measurement of resilience performance for infrastructure construction project delivery. PhD thesis, University of New Mexico, USA.

Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364

Han, Y; Feng, Z; Zhang, J; Jin, R and Aboagye-Nimo, E (2019) Employees' safety perceptions of site hazard and accident scenes. Journal of Construction Engineering and Management, 145(1): 04018117, ISSN 0733-9364

Handojo, T (2001) The framework of a statistical acceptance plan based on the permanent deformation potential of asphalt concrete. PhD thesis, Pennsylvania State University, USA.

Hanif, H; Khurshid, M B; Lindhard, S M and Aslam, Z (2016) Impact of variation orders on time and cost in mega hydropower projects of Pakistan. Journal of Construction in Developing Countries, 21(2), pp. 37-53. ISSN 1823-6499

Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions. PhD thesis, Illinois Institute of Technology, USA.

Hanmer, C; Few, J; Hollick, F; Elam, S and Oreszczyn, T (2026) Tracking energy signatures of British homes from 2020 to 2025. Buildings & Cities, 7(1), pp. 176-195. ISSN 2632-6655

Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364

Hanna, A S; Camlic, R; Peterson, P A and Nordheim, E V (2002) Quantitative definition of projects impacted by change orders. Journal of Construction Engineering and Management, 128(1), pp. 57-64. ISSN 0733-9364

Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364

Hanna, A S and Iskandar, K A (2017) Quantifying and modeling the cumulative impact of change orders. Journal of Construction Engineering and Management, 143(10): 04017076, ISSN 0733-9364

Hanna, A S; Russell, J S; Gotzion, T W and Nordheim, E V (1999) Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3), pp. 176-184. ISSN 0733-9364

Hanna, A S; Russell, J S; Nordheim, E V and Bruggink, M J (1999) Impact of change orders on labor efficiency for electrical construction. Journal of Construction Engineering and Management, 125(4), pp. 224-232. ISSN 0733-9364

Hanna, A S; Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(6), pp. 721-730. ISSN 01446193

Hanna, A S; Tadt, E J and Whited, G C (2012) Request for information: Benchmarks and metrics for major highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1347-1352. ISSN 0733-9364

Hanna, B A (1988) Role expectations of superintendents and architects in the state of Kansas relative to experience in school construction. EdD thesis, University of Kansas, USA.

Hansen, D E (2021) Including commissioning during design phase benefits new construction: A qualitative case study. PhD thesis, Northcentral University, USA.

Hardie, M; Khan, S; O'Donnell, A and Miller, G (2007) The efficacy of waste management plans in Australian commercial construction refurbishment projects. Construction Economics and Building, 7(2), pp. 26-36. ISSN 2204-9029

Harinarain, N and Haupt, T C (2016) Mission: Studio based learning in construction. The University of KwaZulu-Natal case study. Journal of Engineering, Design and Technology, 14(1), pp. 160-181.

Haroglu, H; Glass, J and Thorpe, T (2009) A study of professional perspectives on structural frame selection. Construction Management and Economics, 27(12), pp. 1209-1217. ISSN 1466433X

Haron, Z and Yahya, K (2009) Monte Carlo analysis for prediction of noise from a construction site. Journal of Construction in Developing Countries, 14(1), pp. 1-14. ISSN 1823-6499

Harper, G S (1997) Local government contract management: Decreasing cost overages in contracted out services. DPA thesis, University of La Verne, USA.

Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.

Harris, J R (1980) Organization of building standards: Systematic techniques for scope and arrangement. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Harris, R A and Scott, S (2001) UK practice in dealing with claims for delay. Engineering, Construction and Architectural Management, 8(5-6), pp. 317-324. ISSN 0969-9988

Hartley, S (2018) Craft Education in the United Kingdom and the United States: a cross-cultural examination of ideals, approaches and solutions. PhD thesis, University of York, UK.

Harty, C; Themsen, T N and Tryggestad, K (2014) Risk management and uncertainty in infrastructure projects: What role(s) for knowledge and construction management? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Harun, A N (2015) The application of mobile web and devices for environmental surveillance on construction sites in Malaysia. PhD thesis, University of Salford, UK.

Hasan, A and Jha, K N (2016) Acceptance of the incentive/disincentive contracting strategy in developing construction markets: Empirical study from India. Journal of Construction Engineering and Management, 142(2): 04015064, ISSN 0733-9364

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassan, F U; Le, T and Lv, X (2021) Addressing legal and contractual matters in construction using natural language processing: A critical review. Journal of Construction Engineering and Management, 147(9): 03121004, ISSN 0733-9364

Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.

Hassanain, M A; Al-Zahrani, M; Abdallah, A and Sayed, A M Z (2019) Assessment of factors affecting maintenance cost of public school facilities. International Journal of Building Pathology and Adaptation, 37(5), pp. 528-546. ISSN 23984708

Hassandokht Mashhadi, A; Handy, R; Farhadmanesh, M; Rashidi, A; Honda, T; Sleeth, D K and Henry, T (2022) Feasibility study of using nebulizer-retrofitted uavs at construction projects: The case study of residential jobsites in Utah. Journal of Construction Engineering and Management, 148(10): 05022009, ISSN 0733-9364

Hassanein, A A G and Afify, H M F (2006) Contractors' risk identification behaviour: A case study. Journal of Construction Procurement, 12(1),

Hassanein, A A G and El Nemr, W (2008) Claims management in the Egyptian industrial construction sector: A contractor's perspective. Engineering, Construction and Architectural Management, 15(3), pp. 246-259. ISSN 0969-9988

Hassanein, A A G and el Nemr, W (2007) Management of change order claims in the Egyptian industrial construction sector. Journal of Financial Management of Property and Construction, 12(1), pp. 45-60. ISSN 1366-4387

Hastak, M (1994) Decision support system for project cost control strategy and planning. PhD thesis, Purdue University, USA.

Hatamleh, M T; Hiyassat, M; Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(1), pp. 113-131. ISSN 0969-9988

Hatamleh, M T; Moynihan, G P; Batson, R G; Alzarrad, A and Ogunrinde, O (2023) Risk assessment and ranking in the developing countries' construction industry: The case of Jordan. Engineering, Construction and Architectural Management, 30(4), pp. 1344-1364. ISSN 0969-9988

Havenvid, M I; Hulthén, K; Linné, Å and Sundquist, V (2016) Renewal in construction projects: Tracing effects of client requirements. Construction Management and Economics, 34(11), pp. 790-807. ISSN 01446193

He, C; Liu, M; Hsiang, S M; Pierce, N; Megahed, S and Godfrey, A (2025) An ontological knowledge-driven smart contract framework for implicit bridge preservation decision making. Journal of Construction Engineering and Management, 151(4): 04025008, ISSN 0733-9364

Heaphy, I (2013) NEC versus fidic. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 21-30. ISSN 17514304

Hegazy, T; Elbeltagi, E and Zhang, K (2005) Keeping better site records using intelligent bar charts. Journal of Construction Engineering and Management, 131(5), pp. 513-521. ISSN 0733-9364

Hellowell, M S (2012) Fair return for risk? An examination of structure, competition and profitability in the market for private finance in the National Health Service. PhD thesis, University of Edinburgh, UK.

Henjewele, C; Sun, M and Fewings, P (2011) Value for money optimisation and sustainability in PFI projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Henjewele, C; Sun, M and Fewings, P (2012) Analysis of factors affecting value for money in UK PFI projects. Journal of Financial Management of Property and Construction, 17(1), pp. 9-28. ISSN 1366-4387

Henneberry, J and Rowley, S (2002) Property market processes and development outcomes in cities and regions. Journal of Financial Management of Property and Construction, 7(1), pp. 3-15. ISSN 1366-4387

Herabat, P (1997) A functional specification for a decision support system to select bridge analysis tools. PhD thesis, Carnegie Mellon University, USA.

Heravi, G and Eslamdoost, E (2015) Applying artificial neural networks for measuring and predicting construction-labor productivity. Journal of Construction Engineering and Management, 141(10): 04015032, ISSN 0733-9364

Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193

Hermann, U H; Hasan, S; Al-Hussein, M and Bouferguene, A (2011) Innovative system for off-the-ground rotation of long objects using mobile cranes. Journal of Construction Engineering and Management, 137(7), pp. 478-485. ISSN 0733-9364

Hermans, M; Veldhuis, H; Huizing, D and Rots, S (2019) The embedding of the construction client role in Dutch municipalities and its effects on professionalism and organisational learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Hes, D; Morrison, A W and Bates, M (2005) Assessment and selection of materials for Melbourne city Council House 2. Construction Economics and Building, 5(2), pp. 8-19. ISSN 2204-9029

Hewavitharana, S; Perera, A; Perera, S; Perera, P and Nanayakkara, S (2025) Framework for systematic adoption of ERP systems in the Sri Lankan construction industry. Built Environment Project and Asset Management, 15(3), pp. 629-646. ISSN 2044-124X

Hicks, J C (1992) Heavy construction estimates, with and without computers. Journal of Construction Engineering and Management, 118(3), pp. 545-560. ISSN 0733-9364

Higgins, D M (2013) The black swan effect and the impact on Australian property forecasting. Journal of Financial Management of Property and Construction, 18(1), pp. 76-89. ISSN 1366-4387

Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Hill, C (2010) The concerns of health, safety and welfare within the tri-partite relationship surrounding work placement for construction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hill, S (1997) The complex effects of obstructions on horizontal illuminance in interior lighting design. PhD thesis, University of Reading, UK.

Hinkel, M P (2022) Three essays on labor market regulation in the American construction industry. PhD thesis, Michigan State University, USA.

Hipwood, T (2018) Understanding teleological influences on owner-occupier home improvements: Implications for encouraging low carbon retrofit. PhD thesis, Cardiff University, UK.

Hitchcock, R J (1996) Improving life-cycle information management through documentation of project objectives and design rationale. PhD thesis, University of California, Berkeley, USA.

Hiyassat, M A; Alkasagi, F; El-Mashaleh, M and Sweis, G J (2022) Risk allocation in public construction projects: The case of Jordan. International Journal of Construction Management, 22(8), pp. 1478-1488. ISSN 1562-3599

Hjelseth, E (2010) Exchange of relevant information in BIM objects defined by the role-and life-cycle information model. Architectural Engineering and Design Management, 6(4), pp. 279-287. ISSN 1745-2007

Hoang, V N; Raharjo, J P and Susilawati, C (2022) Meta-frontier efficiency analysis of real estate and construction firms in Indonesia. Construction Management and Economics, 40(10), pp. 770-780. ISSN 01446193

Hollar, D A; Rasdorf, W; Liu, M; Hummer, J E; Arocho, I and Hsiang, S M (2013) Preliminary engineering cost estimation model for bridge projects. Journal of Construction Engineering and Management, 139(9), pp. 1259-1267. ISSN 0733-9364

Holmes, S H; Phillips, T and Wilson, A (2016) Overheating and passive habitability: Indoor health and heat indices. Building Research & Information, 44(1), pp. 1-19. ISSN 0961-3218

Holt, G D; Olomolaiye, P O and Harris, F C (1996) Tendering procedures, contractual arrangements and latham: The contractors' view. Engineering, Construction and Architectural Management, 3(1-2), pp. 97-115. ISSN 0969-9988

Hong, G-S (1989) Efficiency of a regulated housing market: With rent controls, transaction costs and centralized matching costs. PhD thesis, Northwestern University, USA.

Hong, S M; Paterson, G; Mumovic, D and Steadman, P (2014) Improved benchmarking comparability for energy consumption in schools. Building Research & Information, 42(1), pp. 47-61. ISSN 0961-3218

Hooper, M (2015) BIM anatomy II: Standardisation needs & support systems. PhD thesis, Lund University, Sweden.

Hooper, M and Ekholm, A (2012) A BIM-Info delivery protocol. Construction Economics and Building, 12(4), pp. 39-52. ISSN 2204-9029

Hopfe, C J (2009) Uncertainty and sensitivity analysis in building performance simulation for decision support and design optimization. PhD thesis, Eindhoven University of Technology, Netherlands.

Hopkin, T; Lu, S L; Sexton, M and Rogers, P (2019) Learning from defects in the UK housing sector using action research: A case study of a housing association. Engineering, Construction and Architectural Management, 26(8), pp. 1608-1624. ISSN 0969-9988

Hoque, M I; Hasan, M and Datta, S D (2026) Undrained shear strength of soft clay reinforced with encapsulated stone dust columns. International Journal of Building Pathology and Adaptation, 44(1), pp. 1-14. ISSN 2398-4708

Horsthuis, C (2016) The importance of organisational slack as an unexplored determinant of firm level innovation and performance in the construction context. PhD thesis, Loughborough University, UK.

Hosseini, A.; Niknam, M.; Shafaat, A. and Fathi, A. (2026) A unified ontology framework for cross-domain integration of BIM, IoT, and maintenance services in smart facility management. Engineering, Construction and Architectural Management, 33(3), pp. 1784-1812. ISSN 0969-9988

Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.

Hosseini Sabzevari, S A; Mehdipour, H and Aslani, F (2024) An assessment of flash flood susceptibility in Golestan province, Iran, using multiple computational approaches. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 341-356. ISSN 1759-5916

Howard, W E (1996) Innovative strategies for compensation of engineering and construction contractors. PhD thesis, Clemson University, USA.

Howes, R (2000) Improving the performance of earned value analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(4), pp. 399-411. ISSN 0969-9988

Hsie, M (1994) Computer-aided acceptance planning: Generating quality acceptance parameters and stratified sampling plans through neural network learning ability and CAD modeling. PhD thesis, Purdue University, USA.

Hu, Chengdi (2023) Essays on labor market and college education in China. PhD thesis, University of Rochester, USA.

Hu, E C M; Ng, I and Lau, O M F (2011) Speculative bubbles in mass and luxury properties: An investigation of the Hong Kong residential market. Construction Management and Economics, 29(8), pp. 781-793. ISSN 1466433X

Hu, H (2014) Development of interoperable data protocol for integrated bridge project delivery. PhD thesis, State University of New York at Buffalo, USA.

Hu, K (2011) Three essays on modeling complex dynamic problems in health and safety. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Hu, M; Nippala, E; Kallioharju, K and Pelsmakers, S (2022) Monte Carlo simulation approach to understand the cost variance for energy retrofit projects: Comparative study of Finland and the United States. Construction Management and Economics, 40(3), pp. 207-222. ISSN 01446193

Hu, W; Shu, X; Jia, X and Huang, B (2017) Recommendations on intelligent compaction parameters for asphalt resurfacing quality evaluation. Journal of Construction Engineering and Management, 143(9): 04017065, ISSN 0733-9364

Hu, X; Hu, X; Cui, Q; Li, Y; Lemckert, C and Wei, A (2022) Spatial-temporal analysis for the business performance of construction consultancy services in China. Engineering, Construction and Architectural Management, 29(10), pp. 3997-4014. ISSN 0969-9988

Hu, X and Liu, C (2018) Measuring efficiency, effectiveness and overall performance in the Chinese construction industry. Engineering, Construction and Architectural Management, 25(6), pp. 780-797. ISSN 0969-9988

Hu, Z; Chen, S and Zhang, X (2014) Value for money and its influential factors: An empirical study of PPP projects in Japan. Built Environment Project and Asset Management, 4(2), pp. 166-179. ISSN 2044-124X

Huang, Q; Chen, Y; Li, Y; Liu, S; Fan, Z; Chen, X and Chen, J (2026) Maco: An open-image data set with multiannotation strategies for building material counting. Journal of Construction Engineering and Management, 152(4): 04026008, ISSN 0733-9364

Huang, J (2020) Infrastructure, the economy and policy. PhD thesis, University of Oxford, UK.

Huang, J; Han, D; Zhang, H and Cui, W (2024) Framework and case study for the assembly accuracy prediction of prefabricated buildings using BIM and tls. Architectural Engineering and Design Management, 20(6), pp. 1427-1453. ISSN 1745-2007

Huang, Y (2010) Sustainable infrastructure system modeling under uncertainties and dynamics. PhD thesis, University of California, Davis, USA.

Huang, Y L (2008) The pricing of conditional performance guarantees with risky collateral. Construction Management and Economics, 26(9), pp. 967-978. ISSN 1466433X

Hughes, M; Palmer, J; Cheng, V and Shipworth, D (2013) Sensitivity and uncertainty analysis of england's housing energy model. Building Research & Information, 41(2), pp. 156-167. ISSN 0961-3218

Hulio, Z H and Jiang, W (2020) An assessment of effects of non-stationary operational conditions on wind turbine under different wind scenario. Journal of Engineering, Design and Technology, 18(1), pp. 102-121. ISSN 1726-0531

Hulio, Z H; Yousufzai, G and Jiang, W (2021) Statistical analysis of wind resource and energy potential assessment of quaidabad site, sindh Pakistan. Journal of Engineering, Design and Technology, 19(6), pp. 1291-1316. ISSN 1726-0531

Hussein, D (2020) A user preference modelling method for the assessment of visual complexity in building façade. Smart and Sustainable Built Environment, 9(4), pp. 483-501. ISSN 2046-6099

Hussey, H J (2023) Establishing criteria for descriptions of building work which include practicality and intricacy. PhD thesis, University of Northumbria at Newcastle, UK.

Hutcheson, John M (1979) Administration of building contracts with particular reference to the builder's financial control. PhD thesis, University of New South Wales, Australia.

Hutchings, M and Christofferson, J (2005) Factors leading to construction company success: Perceptions of small-volume residential contractors. International Journal of Construction Education and Research, 1(2), pp. 102-111. ISSN 1557-8771

Huuhka, S and Saarimaa, S (2018) Adaptability of mass housing: Size modification of flats as a response to segregation. International Journal of Building Pathology and Adaptation, 36(4), pp. 408-426. ISSN 23984708

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(6), pp. 591-601. ISSN 1466433X

Hyari, K H; Shatarat, N and Khalafallah, A (2017) Handling risks of quantity variations in unit-price contracts. Journal of Construction Engineering and Management, 143(10): 04017079, ISSN 0733-9364

Hymes, S J (2010) Front end specifications and the propagation of construction claims. DSc thesis, Washington University in St. Louis, USA.

Hymes, S J (2011) Front-end specifications and construction claims. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 139-146. ISSN 17514312

Hyun, C; Cho, K; Koo, K; Hong, T and Moon, H (2008) Effect of delivery methods on design performance in multifamily housing projects. Journal of Construction Engineering and Management, 134(7), pp. 468-482. ISSN 0733-9364

Hyung, W G; Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(2), pp. 561-578. ISSN 0969-9988

Ibbs, C W (1985) Product specification practices and problems. Journal of Construction Engineering and Management, 111(2), pp. 157-172. ISSN 0733-9364

Ibbs, C W (1986) Brand name or equalproduct specifications. Journal of Construction Engineering and Management, 112(1), pp. 1-13. ISSN 0733-9364

Ibem, E O; Anosike, M N; Azuh, D E and Mosaku, T O (2011) Work stress among professionals in the building construction industry in Nigeria. Construction Economics and Building, 11(3), pp. 46-57. ISSN 2204-9029

Ibrahim, A; Ali, H; Abuhendi, F and Jaradat, S (2020) Thermal seasonal variation and occupants' spatial behaviour in domestic spaces. Building Research & Information, 48(4), pp. 364-378. ISSN 0961-3218

Ibrahim, M N (2022) Risk management in construction of megahousing projects in Egypt. PhD thesis, London South Bank University, UK.

Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry. PhD thesis, Nottingham Trent University, UK.

Idrissi Gartoumi, K; Aboussaleh, M and Zaki, S (2024) Implementing lean construction to improve quality and megaproject construction: A case study. Journal of Financial Management of Property and Construction, 29(1), pp. 1-22. ISSN 1366-4387

Ikerd II, W F (2021) Level of acceptance (LOA) for scan-to-BIM creation. PhD thesis, University of Denver, USA.

Ilbeigi, M; Ashuri, B and Shayegh, S (2016) Price adjustment clauses and submitted bid prices for major asphalt line items in highway projects. Journal of Construction Engineering and Management, 142(5): 04015103, ISSN 0733-9364

Ilter, D (2012) Identification of the relations between dispute factors and dispute categories in construction projects. International Journal of Law in the Built Environment, 4(1), pp. 45-59. ISSN 1756-1450

Indrastuti (2014) Unit cost modelling of public building project in Kepulauan Riau, Indonesia. PhD thesis, University of Malaya, Malaysia.

Ioannou, P G and Leu, S S (1993) Average-bid method: competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147. ISSN 0733-9364

Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(1), pp. 59-87. ISSN 01446193

Isah, A D; Muhammad, I B and Katun, I (2018) Optimizing architects’ building materials’ specification strategy through knowledge management principles. Construction Innovation, 18(4), pp. 394-411. ISSN 1471-4175

Isaksson, T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.

Isied, M M (2023) Critical assessment of asphalt mixture design procedures and asphalt mixture classification systems. PhD thesis, North Carolina State University, USA.

Islam, M S; Salem, M; Tantawy, M and Salah, M (2024) Cost overrun risk assessment for healthcare projects: A modified fuzzy group decision-making approach. Journal of Construction Engineering and Management, 150(12): 04024168, ISSN 0733-9364

Ismaeel, W S E; Alamoudy, F O and Sameh, R (2023) How renovation activities may jeopardise indoor air quality: Accounting for short and long-term symptoms of sick building syndrome in educational buildings. Architectural Engineering and Design Management, 19(4), pp. 360-377. ISSN 1745-2007

Ismail, Z A (2023) Improving failure risk by better planning and safety for precast beam-to-column connection elements using physical internet-enabled building information modeling technology: A Malaysian case study. International Journal of Building Pathology and Adaptation, 41(3), pp. 517-532. ISSN 23984708

Ittmann, J T (2020) Liability of the structural engineer: Establishing, quantifying, and managing risks. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X

Jackson, J T (1990) Technical specifications' effect on construction. Journal of Construction Engineering and Management, 116(3), pp. 463-467. ISSN 0733-9364

Jackson, S (2002) Development of a tool for whole life design appraisal. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Jacob, J C; Pandit, D and Sen, J (2023) An explorative study on transient cooling pattern and energy efficiency while using micro-zonal occupant-centric control. Architectural Engineering and Design Management, 19(4), pp. 340-359. ISSN 1745-2007

Jacob, J C; Pandit, D and Sen, J (2025) Developing a validated simulation model of micro-zonal air-conditioning to evaluate thermal comfort parameters. Architectural Engineering and Design Management, 21(2), pp. 289-314. ISSN 1745-2007

Jadhav, Ajay (2023) Development of scope of services for procurement of professional consultant services on transportation projects: A study of South carolina department of transportation. PhD thesis, Clemson University, USA.

Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.

Jafarzadeh, R; Ingham, J M; Walsh, K Q; Hassani, N and Ghodrati Amiri, G R (2015) Using statistical regression analysis to establish construction cost models for seismic retrofit of confined masonry buildings. Journal of Construction Engineering and Management, 141(5): 04014098, ISSN 0733-9364

Jagboro, G O and Alli, O R (1999) A study of the monetary value of extension of time in building project. Journal of Financial Management of Property and Construction, 4(3), pp. 39-46. ISSN 1366-4387

Jahren, C T and Johnston, D W (2011) Linkages between construction engineering education and research. Journal of Construction Engineering and Management, 137, pp. 887-894. ISSN 0733-9364

James, P D (2012) The specification of construction strategies for low and zero carbon homes: decision-making tools and the evaluation of whole life energy, carbon, cost and performance. PhD thesis, University of Manchester, UK.

Jamieson, I A (1997) Development of a concurrent engineering construction process protocol. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Jansson, G; Lundkvist, R and Olofsson, T (2015) The role of experience feedback channels in the continuous development of house-building platforms. Construction Innovation, 15(2), pp. 236-255. ISSN 1471-4175

Jaramillo, L V (2019) Implementations of resilience engineering for natural system disturbances: A panarchical perspective. PhD thesis, University of New Mexico, USA.

Jarkas, A M (2013) Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(1), pp. 53-75. ISSN 1366-4387

Jarkas, A M; Al Balushi, R A and Raveendranath, P K (2015) Determinants of construction labour productivity in Oman. International Journal of Construction Management, 15(4), pp. 332-344. ISSN 1562-3599

Jarkas, A M and Bitar, C G (2014) Factors affecting construction labor productivity in Kuwait. Journal of Construction Engineering and Management, 138(7), pp. 811-820. ISSN 0733-9364

Javed, A A; Lam, P T I and Chan, A P C (2014) Change negotiation in public-private partnership projects through output specifications: An experimental approach based on game theory. Construction Management and Economics, 32(4), pp. 323-348. ISSN 01446193

Jayasekara, R U; Jayathilaka, G S; Siriwardana, C; Amaratunga, D; Haigh, R; Bandara, C and Dissanayake, R (2023) Identifying gaps in early warning mechanisms and evacuation procedures for tsunamis in Sri Lanka, with a special focus on the use of social media. International Journal of Disaster Resilience in the Built Environment, 14(1), pp. 1-20. ISSN 1759-5916

Jenner, M S (1997) Designing high performance teams for projects: a study of 49 project teams in the UK construction industry. PhD thesis, Open University, UK.

Jeyakumar, R (2013) The implementation and effectiveness of value engineering in the United Arab Emirates. PhD thesis, University of Glamorgan, UK.

Jiang, A (2012) Negotiating construction contracts through practical cash flow planning and analysis model. International Journal of Construction Management, 12(2), pp. 23-33. ISSN 1562-3599

Jiang, H (2006) Chinese multinational construction firms in international and domestic markets: A re-examination of the eclectic paradigm. PhD thesis, National University of Singapore, Singapore.

Jiang, H and Liu, C (2011) Forecasting construction demand: A vector error correction model with dummy variables. Construction Management and Economics, 29(9), pp. 969-979. ISSN 1466433X

Jiang, H and Liu, C (2014) A panel vector error correction approach to forecasting demand in regional construction markets. Construction Management and Economics, 32(12), pp. 1205-1221. ISSN 01446193

Jiang, H; Xu, Y and Liu, C (2013) Construction price prediction using vector error correction models. Journal of Construction Engineering and Management, 139(11): 4013022, ISSN 0733-9364

Jiménez-Moreno, P (2020) Mass customisation for zero energy housing: the potential of Japanese manufacturing practices in the context of sustainable housebuilding in the United Kingdom. PhD thesis, University of Edinburgh, UK.

Jin, Y (2013) Evaluating infrastructure performance to assist facility management toward sustainable systems. PhD thesis, Michigan Technological University, USA.

Jnior, A C L and Melhado, S B (2011) Design for producing vertical non-loadbearing masonry: Scope analysis. Architectural Engineering and Design Management, 7(4), pp. 275-284. ISSN 1745-2007

Jobe, K (2017) A flexible housing approach for self-help housing in Botswana. PhD thesis, University of Bath, UK.

Johari, S and Jha, K N (2019) Determinants of workmanship: Defining quality in construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531

Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402-411. ISSN 1562-3599

Johnsson, H (2013) Production strategies for pre-engineering in house-building: Exploring product development platforms. Construction Management and Economics, 31(9), pp. 941-958. ISSN 1466433X

Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Johnston, D and Miles-Shenton, D (2009) Airtightness of UK dwellings. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Jones, K (2019) A framework for assessing interventions to promote the implementation of material innovations on construction projects. PhD thesis, University College London, UK.

Jones, K; Mosca, L; Whyte, J; Davies, A and Glass, J (2022) Addressing specialization and fragmentation: Product platform development in construction consultancy firms. Construction Management and Economics, 40(11-12), pp. 918-933. ISSN 01446193

Jones, L (2023) The golden thread of information and fire safety in construction: Making our buildings safer through the development of a robust design specification strategy and BIM framework integration. PhD thesis, University of Derby, UK.

Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.

Jorge, J (1990) Model of uniform cost policies and procedures for the establishment of construction equipment rates. PhD thesis, University of Florida, USA.

Josephson, P E and Chao, M (2014) Use and non-use of time in construction of new multi-dwelling buildings in Sweden. International Journal of Construction Management, 14(1), pp. 28-35. ISSN 1562-3599

Jung, H; Seo, W and Kang, Y (2023) Differences in workers' safety behavior by project size and risk level of work in South Korea. Journal of Construction Engineering and Management, 149(5): 04023028, ISSN 0733-9364

Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364

Junga, W J (1981) The building cycle, shorter cycles of residential construction and federal housing programs: An empirical and theoretical analysis. PhD thesis, University of Connecticut, USA.

J⊘rgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a "lean" perspective. Construction Innovation, 9(2), pp. 225-240. ISSN 1471-4175

K'Akumu, O A; Jones, B and Yang, J (2013) Factor analysis of the market environment for artisanal dimension stone in Nairobi, Kenya. Journal of Construction in Developing Countries, 18(2), pp. 15-32. ISSN 1823-6499

Kaatz, E; Root, D and Bowen, P (2005) Broadening project participation through a modified building sustainability assessment. Building Research & Information, 33(5), pp. 441-454. ISSN 0961-3218

Kaatz, E; Root, D S; Hilland, R C and Bowen, P A (2006) Fostering sustainability and enhancing quality in construction with building sustainability assessment. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Kado, D and Bala, K (2015) Pareto analysis on the quality sections/factors prevalence of Nigerian design firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Kagan, Paula Brumer Franceschini (2024) Occupant behaviour modelling for building performance simulation of naturally ventilated school classrooms. PhD thesis, Universidade Estadual de Campinas, Brazil.

Kahaduwa, A and Rajapakse, L (2022) Review of climate change impacts on reservoir hydrology and long-term basin-wide water resources management. Building Research & Information, 50(5), pp. 515-526. ISSN 0961-3218

Kaka, A P (1996) Towards more flexible and accurate cash flow forecasting. Construction Management and Economics, 14(1), pp. 35-44. ISSN 01446193

Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(1-2), pp. 133-145. ISSN 0969-9988

Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988

Kaka, A P and Price, A D (1994) A survey of contractors' corporate planning and financial budgeting: Contractors lack effective and accurate methods of corporate planning, financial budgeting and cashflow forecasting identified in survey of 15 british construction companies. Building Research & Information, 22(3), pp. 174-182. ISSN 0961-3218

Kaka, A P F (1990) Corporate financial model for construction contractors. PhD thesis, Loughborough University, UK.

Kakitahi, J M; Alinaitwe, H M; Landin, A and Mone, S J (2016) Impact of construction-related rework on selected Ugandan public projects. Journal of Engineering, Design and Technology, 14(2), pp. 238-251.

Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(3), pp. 211-222. ISSN 0969-9988

Kallman, J W (1998) Loss control project decision models for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Kamara, J M; Anumba, C J and Evbuomwan, N F O (2000) Establishing and processing client requirements: A key aspect of concurrent engineering in construction. Engineering, Construction and Architectural Management, 7(1), pp. 15-28. ISSN 0969-9988

Kang, L S and Paulson, B C (1997) Adaptability of information classification systems for civil works. Journal of Construction Engineering and Management, 123(4), pp. 419-426. ISSN 0733-9364

Kanwar, V S; Dutta, H; Dutt, I; Kumar, A; Prakasam, C and Kanwar, M (2022) Impact and awareness of COVID-19 on rural communities: An empirical study of India. Built Environment Project and Asset Management, 12(3), pp. 486-502. ISSN 2044-124X

Kapelko, M and Abbott, M (2017) Productivity growth and business cycles: Case study of the Spanish construction industry. Journal of Construction Engineering and Management, 143(5): 05016026, ISSN 0733-9364

Kaplanoglu, S B (2007) Impact of pre-project peer review on project success. PhD thesis, Illinois Institute of Technology, USA.

Karamujic, H (2012) Modelling seasonality in Australian building approvals. Construction Economics and Building, 12(1), pp. 26-36. ISSN 2204-9029

Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988

Karim, A and Adeli, H (1999) CONSCOM: An OO construction scheduling and change management system. Journal of Construction Engineering and Management, 125(5), pp. 368-376. ISSN 0733-9364

Karimi, S (2021) A systematic methodology for evaluating and balancing acceptance risks with pay factors for highway construction materials. PhD thesis, University of Maryland, College Park, USA.

Karshenas, S (1981) Probabilistic evaluation of safety of buildings during construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Karshenas, S (1989) Truck capacity selection for earthmoving. Journal of Construction Engineering and Management, 115(2), pp. 212-227. ISSN 0733-9364

Karshenas, S (1997) Strength variability of conventional slab formwork systems. Journal of Construction Engineering and Management, 123(3), pp. 324-330. ISSN 0733-9364

Kashem, S B (2019) Housing practices and livelihood challenges in the hazard-prone contested spaces of rural Bangladesh. International Journal of Disaster Resilience in the Built Environment, 10(5), pp. 420-434. ISSN 1759-5916

Kashiwagi, D; Parmar, D and Savicky, J (2003) Case study of the impact of specifications, construction management and inspection on construction performance. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Kashiwagi, D T (2002) Application of information measurement theory (IMT) to construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kashiwagi, D T and Byfield, R (2002) Testing of minimization of subjectivity in best value procurement by using artificial intelligence systems in state of Utah procurement. Journal of Construction Engineering and Management, 128(6), pp. 496-502. ISSN 0733-9364

Kashiwagi, K; Rubin, R A and Harris, M R (1988) Construction law and practice in Japan. Journal of Construction Engineering and Management, 114(1), pp. 104-113. ISSN 0733-9364

Kassa, R; Ogundare, T I; Lines, B; Smithwick, J and Sullivan, K (2024) Comparative analysis of human traits and tendencies: General vs. specialty contractor project managers. International Journal of Construction Education and Research, 20(3), pp. 284-300. ISSN 15578771

Katsanis, C J (1998) An empirical examination of the relationships between strategy, structure and performance in building industry organizations. PhD thesis, Universite de Montreal, Canada.

Katz, J I (2014) Quantifying "cliffs" in design space. Journal of Engineering, Design and Technology, 12(3), pp. 374-388.

Kazar, G and Comu, S (2022) Exploring the relations between the physiological factors and the likelihood of accidents on construction sites. Engineering, Construction and Architectural Management, 29(1), pp. 456-475. ISSN 0969-9988

Kazemi, Hamidreza (2014) Evaluating the effectiveness and hydrological performance of green infrastructure stormwater control measures. PhD thesis, University of Louisville, USA.

Ke, Y (2014) Is public-private partnership a panacea for infrastructure development? The case of Beijing national stadium. International Journal of Construction Management, 14(2), pp. 90-100. ISSN 1562-3599

Ke, Y; Wang, S; Chan, A P C and Cheung, E (2011) Understanding the risks in China's PPP projects: Ranking of their probability and consequence. Engineering, Construction and Architectural Management, 18(5), pp. 481-496. ISSN 0969-9988

Keane, C (2012) Essays in social policy and labour economics. PhD thesis, University College Dublin, Ireland.

Keane, P J (1994) A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects. PhD thesis, Loughborough University, UK.

Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.

Kehinde, J O and Aiyetan, O A (2002) A study of the nature of contractual claims in building contracts in Nigeria. Journal of Financial Management of Property and Construction, 7(3), pp. 197-202. ISSN 1366-4387

Kenley, R and Wilson, O D (1986) A construction project cash flow model: an idiographic approach. Construction Management and Economics, 4(3), pp. 213-232. ISSN 01446193

Kennington, J (1993) Development of an integrated HVAC design environment. PhD thesis, University College, Galway, Ireland.

Kern, A P; Postay, R; Schneck, E R; Mancio, M; González, M A S and Guerra, G (2021) Cost and environmental impacts reduction through building compactness. Engineering, Construction and Architectural Management, 28(4), pp. 1176-1195. ISSN 0969-9988

Kerns, W R (1971) Criteria for determining economic priorities in awarding sewage facility construction grants. PhD thesis, Pennsylvania State University, USA.

Khajuria, A (1994) Quality assurance of concrete using a hybrid knowledge-based expert system. PhD thesis, Rutgers State University of New Jersey, School of Graduate Studies, USA.

Khalafallah, A and Shalaby, Y (2019) Change orders: Automating comparative data analysis and controlling impacts in public projects. Journal of Construction Engineering and Management, 145(11): 04019064, ISSN 0733-9364

Khanam, B R (2000) Contributions of highway capital to output, cost, and productivity growth: Evidence from the Canadian goods-producing sector. PhD thesis, York University, Canada.

Khanzadi, M; Nasirzadeh, F and Dashti, M S (2018) Fuzzy cognitive map approach to analyze causes of change orders in construction projects. Journal of Construction Engineering and Management, 144(2): 04017111, ISSN 0733-9364

Khatibi, H; Wilkinson, S; Heiman, D; Baghersad, M; Ghaedi, K and Javanmardi, A (2022) Indicators bank for smart and resilient cities: Design of excellence. Built Environment Project and Asset Management, 12(1), pp. 5-19. ISSN 2044-124X

Khoshgoftar, M; Bakar, A H A and Osman, O (2010) Causes of delays in Iranian construction projects. International Journal of Construction Management, 10(2), pp. 53-69. ISSN 1562-3599

Khosrowshahi, F (1997) Construction activity in the UK recent trends and projections. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(3), pp. 315-328. ISSN 0969-9988

Khuncumchoo, N (2007) Roof maintenance record analysis toward proactive maintenance policies. PhD thesis, Georgia Institute of Technology, USA.

Khurana, Mayank (2021) Investigation of contractual specification and implementation of relational approaches in public private partnership (PPP) projects. PhD thesis, Virginia Tech, USA.

Kiani, H (1998) A model for measuring effectiveness of building construction organisations: Owner's perspective. PhD thesis, University of Waterloo, USA.

Kifokeris, D; Tjell, J; Viklund-Tallgren, M; Farah, L N and Roupé, M (2020) Challenges in the digital transformation of lean design methods: A case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Kikuchi, S; Kronprasert, N and Easa, S M (2012) Aggregate blending using fuzzy optimization. Journal of Construction Engineering and Management, 138(12), pp. 1411-1420. ISSN 0733-9364

Kikwasi, G J (2023) Claims in construction projects: How causes are linked to effects? Journal of Engineering, Design and Technology, 21(6), pp. 1710-1724. ISSN 1726-0531

Kim, S; Yaşar, M and Shahandashti, M (2025) The effects of disasters on construction wages: Role played by spatial proximity. Construction Economics and Building, 25(3-4), pp. 186-209. ISSN 2204-9029

Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364

Kim, J H (2003) An approach to facilitate knowledge streams of occasional individual building industry clients at the pre-project stage. PhD thesis, University of Reading, UK.

Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.

Kim, J J; Miller, J A and Kim, S (2020) Cost impacts of change orders due to unforeseen existing conditions in building renovation projects. Journal of Construction Engineering and Management, 146(8): 04020094, ISSN 0733-9364

Kim, J S (1995) Reliability-based design of a retaining wall. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kim, K; Cho, Y and Kim, K (2018) BIM-driven automated decision support system for safety planning of temporary structures. Journal of Construction Engineering and Management, 144(8): 04018072, ISSN 0733-9364

Kim, K and De La Garza, J M (2003) Phantom float. Journal of Construction Engineering and Management, 129(5), pp. 507-517. ISSN 0733-9364

Kim, Y and Ham, Y (2024) Revealing the impact of heat radiation on construction: A microclimate simulation using meteorological data and geometric modeling. Journal of Construction Engineering and Management, 150(4): 04024016, ISSN 0733-9364

Kindangen, J I (1996) Artificial neural networks and naturally ventilated buildings. Building Research & Information, 24(4), pp. 203-208. ISSN 0961-3218

King, R (1987) Designing plans for constructibility. Journal of Construction Engineering and Management, 113(1), pp. 1-5. ISSN 0733-9364

Kirby, M; Rotimi, F E and Naismith, N (2025) Factors for improving productivity in the New Zealand residential construction sector. Journal of Engineering, Design and Technology, 23(5), pp. 1712-1728. ISSN 1726-0531

Kirby, J G; Furry, D A and Hicks, D K (1988) Improvements in design review management. Journal of Construction Engineering and Management, 114(1), pp. 69-82. ISSN 0733-9364

Kishk, M; Pollock, R and Okhuahesogie, E (2004) Sensitivity of simulated whole-life costs to input probability distributions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kissi, E; Ahadzie, D K; Adjei-Kumi, T and Badu, E (2017) Rethinking the challenges to the pricing of projects in the Ghanaian construction industry. Journal of Engineering, Design and Technology, 15(5), pp. 700-719.

Kiviniemi, A (2005) Requirements management interface to building product models. PhD thesis, Stanford University, USA.

Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.

Klapa, P. and Mitka, B. (2026) UAV data for BIM-based building assessment across construction stages: Sensor utility evaluation. Building Research & Information, 54(5), pp. 552-572. ISSN 0961-3218

Kleindienst, S and Andersen, M (2012) Comprehensive annual daylight design through a goal-based approach. Building Research & Information, 40(2), pp. 154-173. ISSN 0961-3218

Knost, Benjamin (2022) Incorporating resilience in infrastructure investment decisions: Developed framework, specifications, estimations, and evaluation. PhD thesis, Ohio State University, USA.

Ko, C H and Chung, N F (2014) Lean design process. Journal of Construction Engineering and Management, 140(6): 4014011, ISSN 0733-9364

Ko, T; Jeong, H D and Lee, G (2021) Natural language processing-driven model to extract contract change reasons and altered work items for advanced retrieval of change orders. Journal of Construction Engineering and Management, 147(11): 04021147, ISSN 0733-9364

Ko, T; Lee, J and David Jeong, H (2024) Project requirements prioritization through NLP-driven classification and adjusted work items analysis. Journal of Construction Engineering and Management, 150(3): 04023171, ISSN 0733-9364

Koehn, E (1975) Probabilistic system for project management. PhD thesis, Wayne State University, USA.

Koehn, E and Musser, K (1983) OSHA regulations effects on construction. Journal of Construction Engineering and Management, 109(2), pp. 233-244. ISSN 0733-9364

Kohler, N and Lützkendorf, T (2002) Integrated life-cycle analysis. Building Research & Information, 30(5), pp. 338-348. ISSN 0961-3218

Koirala, M P; Thapa, N; Giri, O P and Sha, R K (2025) Evaluation of variation orders on road construction projects in rural Nepal. Construction Economics and Building, 25(3-4), pp. 311-338. ISSN 2204-9029

Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029

Konstantinou, T; de Jonge, T; Oorschot, L; El Messlaki, S; van Oel, C and Asselbergs, T (2020) The relation of energy efficiency upgrades and cost of living, investigated in two cases of multi-residential buildings in the Netherlands. Smart and Sustainable Built Environment, 9(4), pp. 615-633. ISSN 2046-6099

Koo, K J and Park, S C (2012) GA-based fuel-efficient transfer path selection model for delivering construction materials. Journal of Construction Engineering and Management, 138(6), pp. 725-732. ISSN 0733-9364

Kraft, E R (2013) Alternative quality assurance organizations for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.

Krainer, Christiane Wagner Mainardes (2021) Model of social capital accumulation in civil construction companies. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.

Kramer, R; Schellen, L and Schellen, H (2018) Adaptive temperature limits for air-conditioned museums in temperate climates. Building Research & Information, 46(6), pp. 686-697. ISSN 0961-3218

Krasnokutskaya, E (2003) Identification and estimation in highway procurement auctions under unobserved heterogeneity. PhD thesis, Yale University, USA.

Krima, N (2009) Assessing the effectiveness of Libyan supervisors in dealing with construction delays. PhD thesis, University of Salford, UK.

Krishnan, R (1987) Knowledge-based aids for model construction. PhD thesis, University of Texas at Austin, USA.

Krizek, R J; Wei, L and Ahmad, H (1996) Lessons learned from multiphase reconstruction project. Journal of Construction Engineering and Management, 122(1), pp. 44-54. ISSN 0733-9364

Krone, S J (1991) Decreasing the impact of changes. DSc thesis, George Washington University, USA.

Krych, K; Heeren, N and Hertwich, E G (2021) Factors influencing the life-cycle GHG emissions of Brazilian office buildings. Buildings & Cities, 2(1), pp. 856-873. ISSN 2632-6655

Kulkarni, S S; Chapman, C; Shah, H and Edwards, D J (2018) A computational design method for bio-mimicked horizontal axis tidal turbines. International Journal of Building Pathology and Adaptation, 36(2), pp. 188-209. ISSN 23984708

Kululanga, G K; Kuotcha, W; McCaffer, R and Edum-Fotwe, F (2001) Construction contractors' claim process framework. Journal of Construction Engineering and Management, 127(4), pp. 309-314. ISSN 0733-9364

Kululanga, G K and Price, A D F (2005) Measuring quality of writing of construction specifications. Journal of Construction Engineering and Management, 131(8), pp. 859-865. ISSN 0733-9364

Kumar, A (1994) Development of a model for determining workzone illumination requirements during nighttime highway construction. PhD thesis, University of Florida, USA.

Kumar, R (2020) Risk management framework for construction projects aligned to actualities. PhD thesis, Indian Institute of Technology Delhi, India.

Kumar, R; Chandrashekhar, I K and Singh, S P (2017) Quantification of construction project risks by analysis of past dispute cases. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kumar, R; Iyer, K C and Singh, S P (2021) Understanding relationship between risks and claims for assessing risks with project data. Engineering, Construction and Architectural Management, 28(4), pp. 1014-1037. ISSN 0969-9988

Kumar, S and Bansal, V K (2019) Use of GIS in locating TFs safely on a construction site in hilly regions. International Journal of Construction Management, 19(4), pp. 341-353. ISSN 1562-3599

Kumar, S; Dhingra, A and Singh, B (2018) Lean-kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), pp. 143-160.

Kumar, V (2019) Developing COBie dataset management system (CDMS) to enhance usability of building information model-facilities management information exchange standard. PhD thesis, National University of Singapore, Singapore.

Kuprenas, J A (1988) Use of influence diagrams to assess the cost and schedule impact of construction changes. DEng thesis, University of California, Berkeley, USA.

Kwasafo, O K; Adinyira, E and Agyekum, K (2024) Impact of green construction procurement practices on the success of circular economy in Ghana. Built Environment Project and Asset Management, 14(5), pp. 765-781. ISSN 2044-124X

Kwawu, W; Elhag, T and Ballal, T (2010) Knowledge transfer processes in PFI/PPP: Critical success factors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kwok, T W; Chang, S and Li, H (2024) Factors affecting unitized curtain wall system adoption for hong kong's high-rise residential buildings: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 31(2), pp. 526-543. ISSN 0969-9988

Kwok-Chun, W and Walker, A (2000) Property rights implications of public-private joint ventures. Construction Management and Economics, 18(2), pp. 131-138. ISSN 01446193

Kyalisiima, C; Tutesigensi, A and Kayondo, M (2022) Is the competence of internal stakeholders in construction projects an antidote to construction contract disputes? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Kähkönen, K and Rannisto, J (2015) Understanding fundamental and practical ingredients of construction project data management. Construction Innovation, 15(1), pp. 7-23. ISSN 1471-4175

Köseoğlu Balta, G Ç (2019) A Bayesian belief, network-based, delay risk assessment tool for tunnel projects: BBN tunnel. PhD thesis, Middle East Technical University, Turkey.

Lacey, W E (1964) Change order procedures and practices in California school construction. EdD thesis, University of Southern California, USA.

Lahdenperä, P (2024) Design–build with a development phase: An initiation and the first trials. Construction Economics and Building, 24(4-5), pp. 18-42. ISSN 2204-9029

Lahouti, A (2017) Cue-based decision-making in construction work crews: An agent-based modeling approach. PhD thesis, Michigan State University, USA.

Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. PhD thesis, Cardiff University, UK.

Lallimo, J (2014) From pedagogical ideas to a school building: Analysis of user involvement in building design. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Lam, K C and Oshodi, O S (2015) The capital budgeting evaluation practices (2014) of contractors in the Hong Kong construction industry. Construction Management and Economics, 33(7), pp. 587-600. ISSN 01446193

Lam, P T I (2004) An investigation into the use of specifications in procuring construction works. Journal of Construction Procurement, 10(2),

Lam, P T I; Kumaraswamy, M M and Ng, S T (2004) The use of construction specifications in Singapore. Construction Management and Economics, 22(10), pp. 1067-1079. ISSN 01446193

Lam, P T I; Kumaraswamy, M M and Ng, T S T (2003) A comparative study of user perceptions on prescriptive specifications versus performance-based specifications. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387

Lam, T Y M; Brock, T and Gale, K S (2025) Is "design and build" suitable for social housing projects in the UK housing crisis? Built Environment Project and Asset Management, 15(4), pp. 863-878. ISSN 2044-124X

Lamb, C M (2017) Current construction management methodologies employed by front-line supervisors and degree of understanding of six sigma principles. PhD thesis, Northcentral University, USA.

Lambers, R; Cheung, F and Skitmore, M (2024) Risk management strategies for common residential construction defects: The case of Queensland, Australia. International Journal of Construction Management, 24(10), pp. 1126-1135. ISSN 1562-3599

Lan, O B; Ling, F Y Y and Soo, A (2014) Information feedback and bidders' competitiveness in construction bidding. Engineering, Construction and Architectural Management, 21(5), pp. 571-585. ISSN 0969-9988

Lang, R; Goodier, C and Glass, J (2016) Are housebuilders' production strategies a barrier to offsite construction uptake in the UK? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Langford, D A; Kennedy, P; Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(8), pp. 831-840. ISSN 01446193

Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(6), pp. 2231-2254. ISSN 0969-9988

Langston, Y L and Langston, C (2007) Building energy and cost performance: An analysis of thirty Melbourne case studies. Construction Economics and Building, 7(1), pp. 1-18. ISSN 2204-9029

Lansley, P; McCreadie, C; Tinker, A; Flanagan, S and Goodacre, K (2004) Adapting the homes of older people: A case study of costs and savings. Building Research & Information, 32(6), pp. 468-483. ISSN 0961-3218

Larsen, G D (2011) Understanding the early stages of the innovation diffusion process: Awareness, influence and communication networks. Construction Management and Economics, 29(10), pp. 987-1002. ISSN 01446193

Larsson, B; Sundqvist, J and Emmitt, S (2006) Component manufacturers' perceptions of managing innovation. Building Research & Information, 34(6), pp. 552-564. ISSN 0961-3218

Laura Pisello, A; Xu, X; Taylor, J E and Cotana, F (2012) Network of buildings' impact on indoor thermal performance. Smart and Sustainable Built Environment, 1(1), pp. 73-86. ISSN 2046-6099

Laurell-Stenlund, K (2010) Value creation in development and construction of public buildings: The case of houses of culture. PhD thesis, Luleå University of Technology, Sweden.

Lavikka, R H; Kyrö, R; Peltokorpi, A and Särkilahti, A (2019) Revealing change dynamics in hospital construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 1946-1961. ISSN 0969-9988

Lawani, K; Billy, H and Cameron, I (2021) Conceptualising self-determination theory as an indicator for improving construction worker motivation. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Lawson, W R (1996) Life cycle energy analysis of buildings revisited. Journal of Financial Management of Property and Construction, 1(3), pp. 83-94. ISSN 1366-4387

Le, N. D.; Tran, D. and Williams, N. J. (2026) Exploring competencies for bridge construction inspectors. Journal of Construction Engineering and Management, 152(9): 04026137, ISSN 0733-9364

Le-Hoai, L; Dang, C N; Lee, S B and Lee, Y D (2019) Benchmarking claim causes against contractors in emerging markets: Empirical case study. International Journal of Construction Management, 19(4), pp. 307-316. ISSN 1562-3599

Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304

Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.

Lee, C K and Foo, M Y (2020) Risk attitudes and the big five personality traits: A study on construction project practitioners in Malaysia. International Journal of Construction Management, 22(13), pp. 2435-2445. ISSN 1562-3599

Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Lee, G (2004) A new formal and analytical process to product modeling (PPM) method and its application to the precast concrete industry. PhD thesis, Georgia Institute of Technology, USA.

Lee, G and Kim, S (2012) Case study of mass customization of double-curved metal façade panels using a new hybrid sheet metal processing technique. Journal of Construction Engineering and Management, 138(11), pp. 1322-1330. ISSN 0733-9364

Lee, G; Moon, S and Chi, S (2023) Reference section identification of construction specifications by a deep structured semantic model. Engineering, Construction and Architectural Management, 30(9), pp. 4358-4386. ISSN 0969-9988

Lee, H S; Yu, J H and Kim, S K (2004) Impact of labor factors on workflow. Journal of Construction Engineering and Management, 130(6), pp. 918-923. ISSN 0733-9364

Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.

Lee, I; Roppel, P; Lawton, M and Ferreira, P (2019) Design limits for framed wall assemblies dependent on material choices for sheathing membranes and exterior insulation. International Journal of Building Pathology and Adaptation, 37(4), pp. 426-447. ISSN 23984708

Lee, J (2005) Value analysis of Wi-Fi agent functions in construction. PhD thesis, North Carolina State University, USA.

Lee, J and Ham, Y (2021) Physiological sensing-driven personal thermal comfort modelling in consideration of human activity variations. Building Research & Information, 49(5), pp. 512-524. ISSN 0961-3218

Lee, J S (2023) Quantifying costs of the productivity loss due to schedule changes in construction projects. Engineering, Construction and Architectural Management, 30(1), pp. 56-73. ISSN 0969-9988

Lee, S (2001) Simulation analysis of productivity variation affected by accident risk in underground construction operations. PhD thesis, Purdue University, USA.

Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.

Lee, S; Tae, S; Jee, N and Shin, S (2015) LDA-based model for measuring impact of change orders in apartment projects and its application for prerisk assessment and postevaluation. Journal of Construction Engineering and Management, 141(7): 4015011, ISSN 0733-9364

Lee, S M and Olson, D L (1983) Chance constrained aggregate blending. Journal of Construction Engineering and Management, 109(1), pp. 39-47. ISSN 0733-9364

Lee, S-H (2003) A process model for controlling project productivity of highway construction operations. PhD thesis, University of Florida, USA.

Lees, E (2016) The polluter pays principle and the remediation of the land. International Journal of Law in the Built Environment, 8(1), pp. 2-20. ISSN 1756-1450

Leishman, C and Warren, F (2006) Private housing design customization through house type substitution. Construction Management and Economics, 24(2), pp. 149-158. ISSN 01446193

Lello, D; Huang, Y; Emuze, F and Alananga, S (2024) Professional knowledge infusion and service performance within outbound consultant-supplier interfaces in Tanzania's construction industry: Can networking and stakeholder support play cards? International Journal of Construction Management, 24(15), pp. 1643-1654. ISSN 1562-3599

Lema, N M (1996) Construction labour productivity analysis and benchmarking: the case of Tanzania. PhD thesis, Loughborough University, UK.

Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193

Leu, S S and Lin, Y C (2008) Project performance evaluation based on statistical process control techniques. Journal of Construction Engineering and Management, 134(10), pp. 813-819. ISSN 0733-9364

Levis, James William (2013) A mathematical programming life-cycle assessment model for solid waste management decision making. PhD thesis, North Carolina State University, USA.

Lew, Y L; Hassim, S; Muniandy, R and Hua, L T (2018) Structural equation modelling for subcontracting practice: Malaysia chapter. Engineering, Construction and Architectural Management, 25(7), pp. 835-860. ISSN 0969-9988

Lewis, S J and Greenwood, D J (2002) The treatment of risk in construction contracts under PFI/PPP. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Li, F; Xu, X; Zhou, J; Chen, J and Zhou, S (2026) Automatic generation of inspection knowledge for highway construction via the integration of computer vision and ontology reasoning. Engineering, Construction and Architectural Management, 33(1), pp. 73-97. ISSN 0969-9988

Li, H.; Lyu, R.; Sheng, J.; Menadue, V. and Skitmore, M. (2026) Enhancing eco-efficiency in china's construction industry: Measurement, drivers, and policy implications using an ebm-tobit approach. International Journal of Construction Management, 26(9), pp. 1727-1745. ISSN 1562-3599

Li, L; Cui, X; Wang, J; Jin, H and Xu, H (2026) Automated tracking of worker and heavy equipment on tunnel construction sites: Deep-learning framework. Journal of Construction Engineering and Management, 152(2): 04025237, ISSN 0733-9364

Li, C (2023) Efficient and accurate assessment of fire spread over external claddings in high-rise buildings. PhD thesis, University of Manchester, UK.

Li, F G N; Smith, A Z P; Biddulph, P; Hamilton, I G; Lowe, R; Mavrogianni, A; Oikonomou, E; Raslan, R; Stamp, S; Stone, A; Summerfield, A J; Veitch, D; Gori, V and Oreszczyn, T (2015) Solid-wall U-values: Heat flux measurements compared with standard assumptions. Building Research & Information, 43(2), pp. 238-252. ISSN 0961-3218

Li, H; Arditi, D and Wang, Z (2012) Transaction-related issues and construction project performance. Construction Management and Economics, 30(2), pp. 151-164. ISSN 1466433X

Li, H; Xu, Z and Demeulemeester, E (2015) Scheduling policies for the stochastic resource leveling problem. Journal of Construction Engineering and Management, 141(2): 04014072, ISSN 0733-9364

Li, I H Y (2012) The relationship of cultural incongruence and information processing in facilities management in the public health care sector. PhD thesis, University of Hong Kong, Hong Kong.

Li, J; Zhu, J and Guan, C (2024) Mitigating fatigue in tunnel construction through illumination: Evidence from virtual reality. Journal of Construction Engineering and Management, 150(11): 04024165, ISSN 0733-9364

Li, J; Mao, L and Cao, J (2025) Process model for claim and payment management in a construction supply chain based on smart contracts. Journal of Construction Engineering and Management, 151(11): 04025172, ISSN 0733-9364

Li, Q; Yang, Y; Yao, G; Wei, F; Xue, G and Qin, H (2024) Multiobject real-time automatic detection method for production quality control of prefabricated laminated slabs. Journal of Construction Engineering and Management, 150(3): 05023017, ISSN 0733-9364

Li, S; Cai, H and Kamat, V R (2016) Integrating natural language processing and spatial reasoning for utility compliance checking. Journal of Construction Engineering and Management, 142(12): 04016074, ISSN 0733-9364

Li, Y; Zhang, L; Liu, X and Li, X (2025) A project scheduling optimization model for reducing construction dust emissions based on variability in meteorological conditions. Journal of Construction Engineering and Management, 151(11): 04025171, ISSN 0733-9364

Liao, P C; Shi, H; Su, Y and Luo, X (2018) Development of data-driven influence model to relate the workplace environment to human error. Journal of Construction Engineering and Management, 144(3): 04018003, ISSN 0733-9364

Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material. PhD thesis, Heriot-Watt University, UK.

Lim, E C (1996) The analysis of productivity in building construction. PhD thesis, Loughborough University, UK.

Lim, T K; Park, S M; Lee, H C and Lee, D E (2016) Artificial neural network-based slip-trip classifier using smart sensor for construction workplace. Journal of Construction Engineering and Management, 142(2): 04015065, ISSN 0733-9364

Lin, K Y and Soibelman, L (2007) Knowledge-assisted retrieval of online product information in architectural/engineering/construction. Journal of Construction Engineering and Management, 133(11), pp. 871-879. ISSN 0733-9364

Lin, Q; Zhang, C; Cai, H; Li, X and Xiao, H (2024) Urban night lighting evaluation system and case study: Blending popular contemporary elements, cultural traditions and advanced lighting technologies. Engineering, Construction and Architectural Management, 31(7), pp. 2916-2931. ISSN 0969-9988

Lin, S L (2021) Environmental risk and delay analysis: Lessons learned from the california high speed rail project. DEnv thesis, University of California, Los Angeles, USA.

Lin Htet, N.; Peansupap, V. and Kaewmoracharoen, M. (2026) Influence of material attribute context and document layout variability on large language model performance in construction material specification. International Journal of Construction Management, 26(8), pp. 1669-1689. ISSN 1562-3599

Lindblad, H and Gustavsson, T K (2018) Project managers as involuntary policy implementers? The case of implementing BIM. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Lindhard, S (2014) Understanding the effect of variation in a production system. Journal of Construction Engineering and Management, 140(11): 4014051, ISSN 0733-9364

Lindhard, S M (2024) Applying work measurements to identify productivity potentials: The case of prefabricated concrete elements. International Journal of Construction Management, 24(15), pp. 1668-1678. ISSN 1562-3599

Lindhard, S M; Hamzeh, F; Gonzalez, V A; Wandahl, S and Ussing, L F (2019) Impact of activity sequencing on reducing variability. Journal of Construction Engineering and Management, 145(3): 04019001, ISSN 0733-9364

Lindhard, S M; Neve, H; Terje Kalsaas, B; Møller, D E and Wandahl, S (2022) Ranking and comparing key factors causing time-overruns in on-site construction. International Journal of Construction Management, 22(14), pp. 2724-2730. ISSN 1562-3599

Lindholm, J; Johansson, P and Yitmen, I (2025) Toward a BIM information delivery framework based on common data environment. Construction Innovation, 25(7), pp. 139-157. ISSN 1471-4175

Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771

Ling, C S; Ahmad, M H and Ossen, D R (2007) The effect of geometric shape and building orientation on minimising solar insolation on high-rise buildings in hot humid climate. Journal of Construction in Developing Countries, 12(1), pp. 27-38. ISSN 1823-6499

Lingard, H; Cooke, T and Blismas, N (2011) Coworkers' response to occupational health and safety: An overlooked dimension of group-level safety climate in the construction industry. Engineering, Construction and Architectural Management, 18(2), pp. 159-175. ISSN 0969-9988

Lingard, H; Warmerdam, A and Shooshtarian, S (2019) Getting the balance right: Regulating occupational health and safety planning and coordination in the Australian construction industry. Engineering, Construction and Architectural Management, 26(4), pp. 599-617. ISSN 0969-9988

Lingard, H; Zhang, R P; Blismas, N; Wakefield, R and Kleiner, B (2015) Are we on the same page? Exploring construction professionals' mental models of occupational health and safety. Construction Management and Economics, 33(1), pp. 73-84. ISSN 01446193

Lingard, H C; Cooke, T and Blismas, N (2009) Group-level safety climate in the Australian construction industry: Within-group homogeneity and between-group differences in road construction and maintenance. Construction Management and Economics, 27(4), pp. 419-432. ISSN 1466433X

Lingard, H C; Cooke, T and Blismas, N (2010) Safety climate in conditions of construction subcontracting: A multi-level analysis. Construction Management and Economics, 28(8), pp. 813-825. ISSN 1466433X

Liow, K H (2000) Corporate financial reporting of Singapore property companies: Issues and evidence. Journal of Financial Management of Property and Construction, 5(3), pp. 149-158. ISSN 1366-4387

Liu, J; Jiang, S; Sun, H; Liu, W and Xiao, B (2026) Quality inspection information extraction: Intelligent parsing of construction quality inspection specifications based on natural language processing. Journal of Construction Engineering and Management, 152(4): 04026027, ISSN 0733-9364

Liu, D; Wang, Y; Chen, J and Zhang, Y (2020) Intelligent compaction practice and development: a bibliometric analysis. Engineering, Construction and Architectural Management, 27(5), pp. 1213-1232. ISSN 0969-9988

Liu, H (2017) The impact of owner practices and procedures on construction project safety performance. PhD thesis, University of Kentucky, USA.

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, M (2007) Work flow variability and labor productivity loss for construction projects. PhD thesis, University of California, Berkeley, USA.

Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.

Liu, Margaret Ze-Yu (2016) Energy efficiency retrofits of tertiary education buildings: An investigation of case studies in New South Wales. PhD thesis, University of Sydney, Australia.

Liu, R and Fischer, M (2025) A context taxonomy for construction field crew members. Journal of Construction Engineering and Management, 151(3): 04024214, ISSN 0733-9364

Liu, W (2008) Systems theory based method for construction project planning. PhD thesis, University of Florida, USA.

Liu, W; Zhang, J; Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(6): 04024047, ISSN 0733-9364

Liu, X; Song, Y; Yi, W; Wang, X and Zhu, J (2018) Comparing the random forest with the generalized additive model to evaluate the impacts of outdoor ambient environmental factors on scaffolding construction productivity. Journal of Construction Engineering and Management, 144(6): 04018037, ISSN 0733-9364

Liu, Y; Wang, X; Guo, S; Shi, X and Wang, D (2024) Analyzing the optimization of subsidies for PPP urban rail transit projects: A choice between passenger demand, vehicle kilometer, or an improved efficiency-oriented framework. Journal of Construction Engineering and Management, 150(1): 04023142, ISSN 0733-9364

Lluch, J F (1981) Analysis of construction operations using microcomputers. PhD thesis, Georgia Institute of Technology, USA.

Lockley, S R; Watson, R and Shaaban, S (2002) Managing e-commerce in construction: Revolution or e-business as usual? Engineering, Construction and Architectural Management, 9(3), pp. 232-240. ISSN 0969-9988

Loke, M K; Lee, W P and Yap, J B H (2025) Effective practical strategies for statutory adjudication in construction disputes: Perspectives from adjudicators. International Journal of Construction Management, 25(12), pp. 1488-1499. ISSN 1562-3599

Loosemore, M; Daniele, F and Lim, B T H (2020) Integrating ex-offenders into the Australian construction industry. Construction Management and Economics, 38(10), pp. 877-893. ISSN 01446193

Lordsleem Jr, A C and Melhado, S B (2014) Scope of design for production of wall partitions. Journal of Engineering, Design and Technology, 12(2), pp. 263-279. ISSN 1726-0531

Lu, H (2002) Extended production integration for construction (epic): An integration system for building construction. PhD thesis, University of Florida, USA.

Lu, S L and Sexton, M (2006) Innovation in small construction knowledge-intensive professional service firms: A case study of an architectural practice. Construction Management and Economics, 24(12), pp. 1269-1282. ISSN 1466433X

Lu, W; Li, Z and Wang, S (2017) The role of justice for cooperation and contract's moderating effect in construction dispute negotiation. Engineering, Construction and Architectural Management, 24(1), pp. 133-153. ISSN 0969-9988

Luczywek, Beata (2024) Essays on policy evaluations: Insights from public and labor economics. PhD thesis, University of California, San Diego, USA.

Lum, S K (2003) Market efficiency and technical analysis in the Singapore property market. Journal of Financial Management of Property and Construction, 8(1), pp. 29-39. ISSN 1366-4387

Lundberg, O; Nylén, D and Sandberg, J (2022) Unpacking construction site digitalization: The role of incongruence and inconsistency in technological frames. Construction Management and Economics, 40(11-12), pp. 987-1002. ISSN 01446193

Lundman, P (2011) Cost management for underground infrastructure projects a case study on cost increase and its causes. PhD thesis, Luleå University of Technology, Sweden.

Luo, L; Niu, X; Jiang, K; Bo, Q and Zhou, D (2026) Fuzzy cognitive map-based approach for measuring megaproject complexity considering dynamic interactions. Journal of Construction Engineering and Management, 152(2): 04025255, ISSN 0733-9364

Luo, L; Zhang, L and He, Q (2020) Linking project complexity to project success: A hybrid SEM-FCM method. Engineering, Construction and Architectural Management, 27(9), pp. 2591-2614. ISSN 0969-9988

Luo, L; Zhang, L; Zheng, X and Wu, G (2022) A hybrid approach for investigating impacts of leadership dynamics on project performance. Engineering, Construction and Architectural Management, 29(5), pp. 1965-1990. ISSN 0969-9988

Luo, M; Zhang, H; Wang, Z; Arens, E; Chen, W; Bauman, F S and Raftery, P (2021) Ceiling-fan-integrated air-conditioning: Thermal comfort evaluations. Buildings & Cities, 2(1), pp. 928-951. ISSN 2632-6655

Luo, Xiaowei (2013) Requirements, specifications and deployment models for autonomous jobsite safety proximity monitoring. PhD thesis, University of Texas at Austin, USA.

Löwstedt, M (2014) "Taking off my glasses in order to see": Exploring practice on a building site using self-reflexive ethnograph. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Löwstedt, M (2015) 'Taking off my glasses in order to see': Exploring practice on a building site using self-reflexive ethnography. Construction Management and Economics, 33(5-6), pp. 404-414. ISSN 01446193

Löwstedt, M and Räisänen, C (2012) 'Playing back-spin balls': Narrating organizational change in construction. Construction Management and Economics, 30(9), pp. 795-806. ISSN 1466433X

Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364

Ma, L; Reed, R and Jin, X (2018) Identify the equilibrium of residential construction output: A vector error correction model approach. Engineering, Construction and Architectural Management, 25(1), pp. 21-38. ISSN 0969-9988

Maali, O M (2022) Management practices to improve adoption and employee well-being during organizational changes in the AEC industry. PhD thesis, University of Kansas, USA.

MacIntyre, S; McCord, M; Davis, P T; Zacharopoulos, A and McCord, J A (2023) A spatial examination of solar PV adopters in Northern Ireland: The role of housing market and socio-economic characteristics. Journal of Financial Management of Property and Construction, 28(3), pp. 317-350. ISSN 1366-4387

Macedo, B S and Ferreira, M L R (2023) Welder learning curves behaviour: "Focus on welding productivity with the tig process of marine platforms stainless steel pipes". Engineering, Construction and Architectural Management, 30(2), pp. 496-513. ISSN 0969-9988

Madenli, O; Atasoy, G and Dikmen, I (2026) Identification and categorization of defects in construction specifications utilizing natural language processing. Journal of Construction Engineering and Management, 152(5): 04026044, ISSN 0733-9364

Magdub, R H (2006) Application of the lump sum turnkey contracts in Libyan civil law with reference to English law and international practice. PhD thesis, Glasgow Caledonian University, UK.

Magoda, C M; Gryzagoridis, J and Kanyarusoke, K (2021) Effective heat conductivity of Honeycomb (porous) composite panel. Journal of Engineering, Design and Technology, 19(4), pp. 876-887. ISSN 1726-0531

Mahalingam, A (2006) Understanding and mitigating institutional costs on global projects. PhD thesis, Stanford University, USA.

Mahamid, I (2017) Effect of change orders on rework in highway projects in Palestine. Journal of Financial Management of Property and Construction, 22(1), pp. 62-76. ISSN 1366-4387

Mahamid, I (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction, 22(2), pp. 192-210. ISSN 1366-4387

Mahamid, I (2022) Impact of rework on material waste in building construction projects. International Journal of Construction Management, 22(8), pp. 1500-1507. ISSN 1562-3599

Mahamivanan, H; Ghassemi, N; Tayarani Darbandy, M; Shoeibi, A; Hussain, S; Nasirzadeh, F; Alizadehsani, R; Nahavandi, D; Khosravi, A and Nahavandi, S (2025) Material recognition for construction quality monitoring using deep learning methods. Construction Innovation, 25(3), pp. 732-760. ISSN 1471-4175

Mahamood, S Z H and Fathi, M S (2022) Seismic building design work process using building information modeling (BIM) technology for Malaysian government projects. International Journal of Disaster Resilience in the Built Environment, 13(2), pp. 211-232. ISSN 1759-5916

Mahapatra, K; Gustavsson, L and Hemstrm, K (2012) Multi-storey wood-frame buildings in Germany, Sweden and the UK. Construction Innovation, 12(1), pp. 62-85. ISSN 1471-4175

Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.

Mahdjoubi, L (2001) An investigation of computer-generated architectural representations on design decision-tasks. PhD thesis, University of Newcastle upon Tyne, UK.

Mahdy, M M M (2014) Applying architecture simulation tools to assess building sustainable design: adapting the Egyptian residential energy code for climate change. PhD thesis, University of Kent, UK.

Mahfouz, T; Davlyatov, S and Kandil, A (2016) Analysis of differing site condition litigation reasoning through statistical modeling. International Journal of Construction Education and Research, 12(4), pp. 285-302. ISSN 1557-8771

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.

Mahjoubpour, B; Nasirzadeh, F; Mohammad Hosein Zadeh Golabchi, M; Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers' learning behavior in construction projects using agent-based approach: The case study of a steel structure project. Engineering, Construction and Architectural Management, 25(4), pp. 559-573. ISSN 0969-9988

Mahmood, W Y W and Mohammed, A H (2008) A conceptual framework for the development of quality culture in the construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Mahmoud, H M (1998) Applying a fuzzy logic expert system in the selection of bridge deck joints. PhD thesis, University of Central Florida, USA.

Mahmoud, S; Hussein, M; Zayed, T and Fahmy, M (2022) Multiobjective optimization model for the life cycle cost-sustainability trade-off problem of building upgrading using a generic sustainability assessment tool. Journal of Construction Engineering and Management, 148(7): 04022050, ISSN 0733-9364

Majdalani, J G (2010) Management, operation, and maintenance of wastewater systems. DE thesis, Lamar University - Beaumont, USA.

Mak, S; Wong, J and Picken, D (1998) The effect on contingency allowances of using risk analysis in capital cost estimating: A Hong Kong case study. Construction Management and Economics, 16(6), pp. 615-619. ISSN 01446193

Malakhatka, E; Shafqat, O; Sandoff, A and Thuvander, L (2025) Positive energy districts and energy communities: How living labs create value. Buildings & Cities, 6(1), pp. 783-799. ISSN 2632-6655

Malekzadeh, H; Edwards, D J and Harris, F C (2005) Simulating the ground freezing process: a decision support model. Journal of Construction Research, 6(1), pp. 107-121. ISSN 1609-9451

Malin, N (2000) The cost of green materials. Building Research & Information, 28(5-6), pp. 408-412. ISSN 0961-3218

Malla, V and Delhi, V S K (2022) Determining interconnectedness of barriers to interface management in large construction projects. Construction Economics and Building, 22(2), pp. 69-101. ISSN 2204-9029

Mamutse, B (2016) Environmental liabilities in insolvency: an area ripe for reform? International Journal of Law in the Built Environment, 8(3), pp. 243-268. ISSN 1756-1450

Manamgoda, M G N; Perera, B A K S and Perera, C S R (2018) Impact of interest rates of bank loans on road construction: The case of Sri Lanka. Journal of Engineering, Design and Technology, 16(4), pp. 518-532. ISSN 1726-0531

Manamperi, S; Munmulla, T; Navaratnam, S and Zhang, G (2026) Impact of economic inflation on the mental health of construction professionals: A quantitative study. Journal of Construction Engineering and Management, 152(1): 04025228, ISSN 0733-9364

Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance. PhD thesis, University of Manchester, UK.

Mani, S.; Karunasena, G.; Hosseini, M. R. and Hasan, A. (2026) Building circularity performance model: A weighted multi-level assessment framework aligned with ISO standards. Smart and Sustainable Built Environment, ISSN 2046-6099

Manninen, D L (1981) Labor force migration associated with nuclear power plant construction. PhD thesis, University of Washington, USA.

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Evaluating the efficiency and productivity of general workers in structural work practices of building construction through work-based training applications. International Journal of Construction Management, 24(3), pp. 339-350. ISSN 1562-3599

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Assessing the performance and productivity of labour in building construction projects through the application of work-based training practices. Construction Innovation, 24(2), pp. 558-583. ISSN 1471-4175

Maqsoom, A; Choudhry, R M; Umer, M and Mehmood, T (2021) Influencing factors indicating time delay in construction projects: Impact of firm size and experience. International Journal of Construction Management, 21(12), pp. 1251-1262. ISSN 1562-3599

Maradza, E N (2015) Adaptation of industry BIM process standards in a large construction firm. PhD thesis, University of Reading, UK.

Marasini, R; Dawood, N S and Hobbs, B (2001) Stockyard layout planning in precast concrete products industry: A case study and proposed framework. Construction Management and Economics, 19(4), pp. 365-377. ISSN 01446193

Maritz, M J (2003) Towards establishing national standards for the classification of construction information in the republic of South Africa. PhD thesis, University of Pretoria, South Africa.

Maritz, M J and Hattingh, V (2015) Electronic communication in the construction industry. Journal of Engineering, Design and Technology, 13(1), pp. 74-93.

Marsh, R (2017) Building lifespan: Effect on the environmental impact of building components in a Danish perspective. Architectural Engineering and Design Management, 13(2), pp. 80-100. ISSN 1745-2007

Martin, J C; Akande, K and Falconer, R A (2010) Innovations from the Halcrow-Cardiff university strategic collaboration. Engineering, Construction and Architectural Management, 17(1), pp. 46-64. ISSN 0969-9988

Martin, L and Root, D (2007) Reflections and observations on the use of broad-based survey methods on the South African construction sector. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(1), pp. 90-108. ISSN 1471-4175

Marzuki, P; Oktavianus, A; Regina, A and Hasiholan, B (2019) Interface problems in change order-challenged projects. Journal of Construction in Developing Countries, 24(2), pp. 1-22. ISSN 1823-6499

Masera, M (1999) An innovative planning technique in quality management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Mason, G E (1973) A quantitative risk management approach to the selection of construction contract provisions. PhD thesis, Stanford University, USA.

Masterson, J (2008) Employer perspective of the new Irish public works contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 99-105. ISSN 17514312

Matarneh, S (2024) Construction disputes causes and resolution methods: A case study from a developing country. Journal of Construction in Developing Countries, 29(1), pp. 139-161. ISSN 1823-6499

Mathews, J D (2000) Optimisation and decision support during the conceptual stage of building design: New techniques based on the genetic algorithm. PhD thesis, University of Plymouth, UK.

Matoseiro Dinis, F; Rodrigues, R and Pedro da Silva Poças Martins, J (2024) Development and validation of natural user interfaces for semantic enrichment of BIM models using open formats. Construction Innovation, 24(1), pp. 196-220. ISSN 1471-4175

Matsumoto, I; Stapleton, J; Glass, J and Thorpe, T (2005) Developing a framework to measure organizational and employee skills development in a professional engineering design consultancy. Construction Innovation, 5(1), pp. 53-66. ISSN 1471-4175

Mawdesley, M J; Al-Jibouri, S H and Clark-Hughes, J (2002) A proactive control approach to agreeing entitlement to claims in construction. Journal of Financial Management of Property and Construction, 7(1), pp. 41-48. ISSN 1366-4387

Mayouf, M and Gilligan, C (2024) Synthesis towards unveiling the complexity underlying underpayment for subcontractors in construction. Journal of Financial Management of Property and Construction, 29(1), pp. 168-192. ISSN 1366-4387

Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.

Mbachu, J (2011) Sources of contractor's payment risks and cash flow problems in the New Zealand construction industry: Project team's perceptions of the risks and mitigation measures. Construction Management and Economics, 29(10), pp. 1027-1041. ISSN 01446193

Mbugua, L M (2000) A methodology for evaluating the business performance of UK construction companies. PhD thesis, University of Wolverhampton, UK.

McCarthy, S C (1991) BOT and OMT contracts for infrastructure in developing countries. PhD thesis, University of Birmingham, UK.

McConnell, William J (2026) Termination-for-default risk for construction contractors. PhD thesis, University of Colorado at Denver, USA.

McCord, J; McCord, M; McCluskey, W; Davis, P T; McIlhatton, D and Haran, M (2014) Effect of public green space on residential property values in Belfast metropolitan area. Journal of Financial Management of Property and Construction, 19(2), pp. 117-137. ISSN 1366-4387

McCord, M; Davis, P T; Haran, M; McGreal, S and McIlhatton, D (2012) Spatial variation as a determinant of house price: Incorporating a geographically weighted regression approach within the Belfast housing market. Journal of Financial Management of Property and Construction, 17(1), pp. 49-72. ISSN 1366-4387

McFarland, A E (2010) An end user approach to teaching specifications. International Journal of Construction Education and Research, 6(2), pp. 83-103. ISSN 1557-8771

McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.

McLeish, D C A (1978) House building productivity: A study of labour requirements on Scottish house building sites using activity sampling methods. PhD thesis, Aston University, UK.

McMahon, P; Dawood, N N and Hobbs, B (1998) The utilization of it for managing ground information and optimizing earthworks. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

McMahon, P; Dawood, N N and Hobbs, B (1999) Development of an integrated ground modelling system. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

McNerney, M T (1994) The use of geographical information systems for airport engineering and management. PhD thesis, University of Texas at Austin, USA.

McQuillen, J L and Gary Hicks, R (1987) Construction of rubber-modified asphaut pavements. Journal of Construction Engineering and Management, 113(4), pp. 537-553. ISSN 0733-9364

McWilliam, R C (2002) The evolution of British standards. PhD thesis, University of Reading, UK.

Meacham, B J (2000) A process for identifying, characterizing, and incorporating risk concepts into performance-based building and fire regulation development. PhD thesis, Clark University, USA.

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Mekid, S and Bashmal, S (2019) Engineering manipulation at nanoscale: Further functional specifications. Journal of Engineering, Design and Technology, 17(3), pp. 572-590. ISSN 1726-0531

Melgarejo, J A (1987) A decision model for human error in the design and construction process. PhD thesis, University of Michigan, USA.

Mell, Ian Caleb (2010) Green infrastructure: Concepts, perceptions and its use in spatial planning. PhD thesis, University of Newcastle upon Tyne, UK.

Men, Y (2023) Investigation into sustainable solutions for improving small and medium sized museums in China. PhD thesis, De Montfort University, UK.

Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364

Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364

Meng, S (2023) Development of a regional wind risk assessment framework for wood-frame single-family residential building stock. PhD thesis, University of California, Los Angeles, USA.

Meniru, K C U (2005) Computer-aided conceptual building design. PhD thesis, Concordia University, Canada.

Menoka, B (2014) Stakeholder engagement and sustainability-related project performance in construction. PhD thesis, Liverpool John Moores University, UK.

Merchant, A and Bajaj, D (2002) An analysis of the use of the "design-build" project delivery system by interior design firms, and its effectiveness in delivering fit-out projects. Journal of Construction Procurement, 8(1), pp. 17-34. ISSN 1358-9180

Meyer, H W G (1991) Conceptual model for integrating business activity and data systems in the AEC industry. PhD thesis, University of Wisconsin - Madison, USA.

Mhundwa, R and Simon, M (2021) Electrical energy prediction using a surface fitting model for an on-farm direct expansion bulk milk cooler (DXBMC) in South Africa. Journal of Engineering, Design and Technology, 19(3), pp. 778-794. ISSN 1726-0531

Mickovski S B, B J D S M J (2013) Innovative use of ECC (NEC) for procurement and management of infrastructure projects with limited funding: Bervie Braes case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Milberg, C T (2006) Application of tolerance management to civil systems. PhD thesis, University of California, Berkeley, USA.

Milberg, C T and Tommelein, I D (2020) Methods for managing tolerance compatibility: Windows in cast-in-place concrete. Journal of Construction Engineering and Management, 146(2), ISSN 0733-9364

Min, Y and Lee, H W (2024) Adoption inequalities and causal relationship between residential electric vehicle chargers and heat pumps. Journal of Construction Engineering and Management, 150(5): 04024025, ISSN 0733-9364

Minchin, R E; Hammons, M I and Ahn, J (2008) A construction quality index for highway construction. Construction Management and Economics, 26(12), pp. 1313-1324. ISSN 1466433X

Mircheva, B K (2009) Infrastructure: The building block for exports in sub-Saharan Africa? PhD thesis, American University, USA.

Mirzaee, A M and Martek, I (2025) Improving project management "closeout" phase outcomes: Evidence from a large general contractor in Iran using "x-inefficiency theory". Engineering, Construction and Architectural Management, 32(8), pp. 5253-5271. ISSN 0969-9988

Mirzaee, A M and Martek, I (2026) Utilizing multiple intelligences as a means to improving claim performance outcomes in project-based organizations. Engineering, Construction and Architectural Management, 33(1), pp. 532-551. ISSN 0969-9988

Mirzaei, Z (2015) An investigation of methodologies to determine the most sustainable bridge work programs. DSc thesis, ETH Zürich, Switzerland.

Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), pp. 26-33. ISSN 1562-3599

Miura, K (2017) International joint ventures in the US military construction programs in Japan: An exploratory case study investigation. PhD thesis, Northcentral University, USA.

Mlitwa, N W B and Wanyonyi, D W (2015) Towards interactive open source based m-Learning solution: The m-Chisimba framework. Journal of Engineering, Design and Technology, 13(3), pp. 463-485.

Mofolasayo, A (2025) Multi-variable evaluation of factors that contribute to the environmental impact of onsite and offsite building construction: An illustration using roof panel fastening schedule. International Journal of Construction Management, 25(16), pp. 1938-1951. ISSN 1562-3599

Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.

Mohamed, I F; Edwards, D J; Mateo-Garcia, M; Costin, G and Thwala, W D D (2020) An investigation into the construction industry's view on fire prevention in high-rise buildings post Grenfell. International Journal of Building Pathology and Adaptation, 38(3), pp. 451-471. ISSN 23984708

Mohamed, M (2022) A risk-based model for construction inspection in highways. PhD thesis, University of Kansas, USA.

Mohammad Ahmad, A; Rodriguez Trejo, S; Hafeez, M A; Dawood, N; Kassem, M and Naji, K K (2023) Drivers for energy analysis towards a BIM-enabled information flow. Smart and Sustainable Built Environment, 12(3), pp. 507-533. ISSN 2046-6099

Mohammadinia, M R (1997) Development of rational and defensible pay schedules for a performance specification using performance prediction and user and agency costs. PhD thesis, Polytechnic University, USA.

Mohareb, E; Gillich, A and Bristow, D (2022) Participation in domestic energy retrofit programmes: Key spatio-temporal drivers. Buildings & Cities, 3(1), pp. 356-375. ISSN 2632-6655

Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations. PhD thesis, University of Maryland, College Park, USA.

Mohsini, R A and Davidson, C H (1992) Determinants of performance in the traditional building process. Construction Management and Economics, 10(4), pp. 343-359. ISSN 01446193

Molenaar, K R (1997) Public sector design-build: A model for project selection. PhD thesis, University of Colorado at Boulder, USA.

Momade, M H; Shahid, S; Falah, G; Syamsunur, D and Estrella, D (2023) Review of construction labor productivity factors from a geographical standpoint. International Journal of Construction Management, 23(4), pp. 697-707. ISSN 1562-3599

Montalbán-Domingo, L; Torres-Machi, C; Sanz-Benlloch, A; Pellicer, E and Molenaar, K R (2023) Green public procurement in civil infrastructure construction: Current performance and main project characteristics. Journal of Construction Engineering and Management, 149(9): 04023089, ISSN 0733-9364

Moon, S; Choi, E and Hong, S (2016) Creation of robust design alternatives for temporary construction in value engineering. Journal of Construction Engineering and Management, 142(3): 04015086, ISSN 0733-9364

Moon, S; Lee, G; Chi, S and Oh, H (2021) Automated construction specification review with named entity recognition using natural language processing. Journal of Construction Engineering and Management, 147(1): 04020147, ISSN 0733-9364

Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180

Morbitzer, C A (2003) Towards the integration of simulation into the building design process. PhD thesis, University of Strathclyde, UK.

Moriyani, M A; Le, C; Le, T and Pirim, H (2026) Beyond one-size-fits-all: A novel data-driven framework for quantifying bidding competition intensity in highway design-bid-build contracts. Journal of Construction Engineering and Management, 152(3): 04026006, ISSN 0733-9364

Morris, J (1999) Improving construction design: the lean thinking paradigm. PhD thesis, Cranfield University, UK.

Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364

Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364

Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175

Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364

Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp. 1004-1017. ISSN 0969-9988

Motaleb, O and Kishk, M (2010) An investigation into causes and effects of construction delays in UAE. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.

Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988

Moyo, Cynthia; Moyo, Tirivavi and Mudombo, Mabel Vongai (2026) Integrating sustainable materials into construction: A review of Zimbabwe’s model building by-laws. Journal of Construction Business and Management, 8(S1), pp. 99-110. ISSN 2521-0165

Moyo, T (2020) Integrating sustainability dimensions into construction labour productivity determinants in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.

Mucheti, Alexsander Silva (2025) Experimental and numerical analysis of nailed soil structures in urban areas. PhD thesis, Universidade Estadual de Campinas, Brazil.

Muir Jr., R W (2015) Application of lean construction principles to highway projects: Analysis of barriers to timely delivery of service. PhD thesis, Drexel University, USA.

Mujumdar, P (2017) Modeling design interdependency and iteration for multiple two-way information exchanges in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Mukhopadhyay, J (2020) Observations of energy consumption and IEQ in a 'tiny house'. Building Research & Information, 48(6), pp. 613-631. ISSN 0961-3218

Muleya, F (2014) Modelling wheeled construction plant performance in clay and sandy terrain: a terramechanics perspective. PhD thesis, Anglia Ruskin University, UK.

Mullens, M A and Arif, M (2006) Structural insulated panels: Impact on the residential construction process. Journal of Construction Engineering and Management, 132(7), pp. 786-794. ISSN 0733-9364

Mulville, M; Jones, K and Huebner, G (2014) The potential for energy reduction in UK commercial offices through effective management and behaviour change. Architectural Engineering and Design Management, 10(1-2), pp. 79-90. ISSN 1745-2007

Mun, H; Jeong, J; Jeong, J and Kumi, L (2025) Statistical hypothesis test approach considering workers' thermal comfort to determine nonworking days in different climate zones. Journal of Construction Engineering and Management, 151(9): 04025116, ISSN 0733-9364

Munhos, M M and da Silva, A M (2024) Eco-roofs: Influence of shape and material variations on surface temperature, rainwater volume and quality. Architectural Engineering and Design Management, 20(6), pp. 1709-1724. ISSN 1745-2007

Munonye, C (2021) Determining the diurnal variation in comfort temperature in school buildings in the warm and humid climate. International Journal of Building Pathology and Adaptation, 39(5), pp. 766-781. ISSN 23984708

Mushtaq, K A B; Hassan, M U; Ahmad, T and Choudhry, R M (2026) Impact of BIM on quality of planning and design in highway infrastructure projects: SEM-based inquiry. Journal of Construction Engineering and Management, 152(2): 04025262, ISSN 0733-9364

Mwakabole, G C; Gurmu, A T and Tivendale, L (2019) Investigation of the challenges facing public-private partnership projects in Australia. Construction Economics and Building, 19(1), pp. 57-74. ISSN 2204-9029

Mwelu, N; Davis, P R; Ke, Y; Watundu, S and Jefferies, M (2021) Success factors for implementing Uganda's public road construction projects. International Journal of Construction Management, 21(6), pp. 598-614. ISSN 1562-3599

Mwelu, N; Watundu, S and Moya, M (2024) Demand side perception on success factors for implementing public road construction projects. Journal of Construction in Developing Countries, 29(1), pp. 1-22. ISSN 1823-6499

Mwesigwa, R; Nabwami, R; Mayengo, J and Basulira, G (2020) Contractual completeness as a cornerstone to stakeholder management in public private partnership projects in Uganda. Built Environment Project and Asset Management, 10(3), pp. 469-484. ISSN 2044-124X

Müller, B (2016) Policy gaps: Future challenges for research. Building Research & Information, 44(3), pp. 338-341. ISSN 0961-3218

Na, R (2013) Property rights analysis of building material pricing. PhD thesis, University of Hong Kong, Hong Kong.

Naderpajouh, N; Mahdavi, A; Hastak, M and Aldrich, D P (2014) Modeling social opposition to infrastructure development. Journal of Construction Engineering and Management, 140(8): 04014029, ISSN 0733-9364

Nagar, S (2015) Internationalisation of New Zealand civil construction firms: opportunities and challenges in Asia. PhD thesis, Auckland University of Technology, New Zealand.

Naji, K K; Gunduz, M and Maki, O (2023) Development of a campus facility management operational framework using a modified Delphi method. Journal of Construction Engineering and Management, 149(7): 04023052, ISSN 0733-9364

Naji, K K; Gunduz, M and Naser, A F (2022) The effect of change-order management factors on construction project success: A structural equation modeling approach. Journal of Construction Engineering and Management, 148(9): 04022085, ISSN 0733-9364

Napolitan, C L (1995) Improvement to the forecast precision of the factor model for masonry productivity. PhD thesis, Pennsylvania State University, USA.

Nassar, K and Hosny, O (2012) Solving the least-cost route cut and fill sequencing problem using particle swarm. Journal of Construction Engineering and Management, 138(8), pp. 931-942. ISSN 0733-9364

Navarro-Astor, E C V (2012) Architects in Spain: A profession under risk. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Navendren, D; Manu, P; Shelbourn, M and Mahamadu, A M (2014) Challenges to building information modelling implementation in UK: Designers' perspectives. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Navon, R and Arkin, H (1993) Economic comparison of an air-conditioner and a desert cooler for residences in arid areas. Construction Management and Economics, 11(1), pp. 62-70. ISSN 01446193

Ndekugri, I; Ankrah, N A; Adaku, E and Mzyece, D (2021) An analysis of health and safety provisions in NEC contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(2), pp. 65-75. ISSN 17514304

Ndekugri, I E (1986) Construction contract information management: an integrated systems approach. PhD thesis, Loughborough University, UK.

Nepal, M P (2011) Automated extraction and querying of construction-specific design features from a building information model. PhD thesis, University of British Columbia, Canada.

Newman, W H (1934) The building industry and business cycles. PhD thesis, University of Chicago, USA.

Newton, L A (2004) The impact of quality on building life cycle costs. PhD thesis, University of New Brunswick, Canada.

Newton, S (1983) Analysis of construction economics: a cost simulation model. PhD thesis, University of Strathclyde, UK.

Ng, K F (2017) Sustainable housing and railway developments over space and time. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Ng, S T; Mak, M M Y; Skitmore, R M; Lam, K C and Varnam, M (2001) The predictive ability of bromilow's time-cost model. Construction Management and Economics, 19(2), pp. 165-173. ISSN 01446193

Nguyen, V N; Peansupap, V and Tongthong, T (2025) Complexity measurement framework for change orders in construction projects: Case study of Vietnam. Journal of Engineering, Design and Technology, 23(6), pp. 2082-2104. ISSN 1726-0531

Nguyen, D A; Garvin, M J and Gonzalez, E E (2018) Risk allocation in U.S. Public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5): 04018017, ISSN 0733-9364

Nguyen, F B T (2024) Quality control of front-end planning for electric power construction: A collaborative process-based approach using systems engineering. PhD thesis, Colorado State University, USA.

Nguyen, L D and Ibbs, W (2010) Case law and variations in cumulative impact productivity claims. Journal of Construction Engineering and Management, 136(8), pp. 826-833. ISSN 0733-9364

Nguyen, P H D; Lines, B C and Tran, D Q (2018) Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes. Journal of Construction Engineering and Management, 144(10): 04018093, ISSN 0733-9364

Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(5): 04024030, ISSN 0733-9364

Nguyen, T T (2017) Modeling of CLT creep behavior and real-time hybrid simulation of a CLT-LiFS building. PhD thesis, University of Alabama, USA.

Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.

Nguyen, V T and Do, S T (2023) Assessing the relationship chain among causes of variation orders, project performance, and stakeholder performance in construction projects. International Journal of Construction Management, 23(9), pp. 1592-1602. ISSN 1562-3599

Nicholas, J and Edwards, D J (2003) A model to evaluate materials suppliers' and contractors' business interactions. Construction Management and Economics, 21(3), pp. 237-245. ISSN 01446193

Nicol, J F and Humphreys, M A (2009) New standards for comfort and energy use in buildings. Building Research & Information, 37(1), pp. 68-73. ISSN 0961-3218

Nielsen, L-H K; Akanmu, A and Anumba, C J (2015) Comparative analysis of back-to-back subcontracts in the construction and telecommunications industries. Built Environment Project and Asset Management, 5(4), pp. 446-460. ISSN 2044-124X

Nikkhah Manesh, S (2020) Temporal and spatial analysis of the wage gap for women and underrepresented minorities in the architecture, engineering, and construction (AEC) workforce. PhD thesis, University of Nevada, Las Vegas, USA.

Nikmehr, B; Kafle, B and Al-Ameri, R (2024) A review of the advanced treatment techniques for enriching the recycled concrete aggregates for recycled-based concrete: Economic, environmental and technical analysis. Smart and Sustainable Built Environment, 13(3), pp. 560-583. ISSN 2046-6099

Nilsson, S (2003) Durability of district heating pipes. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Njoku, A I (2014) Evaluation of the impact of adherence to project governance principles on the outcome of large infrastructure projects implemented in developing economies, with Nigeria as an example. PhD thesis, University of Bradford, UK.

Nobe, M D (1996) Decision support for real estate development cost estimating. PhD thesis, Texas A&M University, USA.

Noktehdan, M; Shahbazpour, M; Zare, M R and Wilkinson, S (2019) Innovation management and construction phases in infrastructure projects. Journal of Construction Engineering and Management, 145(2): 04018135, ISSN 0733-9364

Noor, I (1992) A study of the variability of labour productivity in building trades. PhD thesis, University of Dundee, UK.

Noorifard, A; Mehdizadeh Saradj, F and Tabeshpour, M R (2023) A model for determining the arrangement and geometric specifications of infill walls in the architectural design to improve the seismic behavior of buildings. Architectural Engineering and Design Management, 19(5), pp. 439-462. ISSN 1745-2007

Nordin, A (2013) Constructing component-based systems directly from requirements using incremental composition. PhD thesis, University of Manchester, UK.

Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.

Noruwa, B I; Arewa, A O and Merschbrock, C (2022) Effects of emerging technologies in minimising variations in construction projects in the UK. International Journal of Construction Management, 22(11), pp. 2199-2206. ISSN 1562-3599

Nosheen, A (2022) Development of an effective claim management framework for the UK construction industry. PhD thesis, Coventry University, UK.

Nouh, A; Elkasaby, E and Hussein, K (2023) Establishment of prediction system for cost of defect liability phase in construction project. Construction Innovation, 23(2), pp. 467-486. ISSN 1471-4175

Ntiyakunze, S K (2011) Conflicts in building projets in Tanzania: Analysis of causes and management approaches. PhD thesis, KTH Royal Institute of Technology, Sweden.

Nunes, M C M (1997) Enabling the use of alternative materials in road construction. PhD thesis, University of Nottingham, UK.

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Nwodo, M N (2020) Investigation of exergy-based life cycle assessment of buildings. PhD thesis, University of Florida, USA.

O'Connor, M G (2016) Labour market institutions in the Brazilian variety of capitalism since 2003: Evidence from the construction industry. PhD thesis, University of York, UK.

O'Mahony, M M (1990) Recycling of materials in civil engineering. PhD thesis, University of Oxford, UK.

Obeng-Ahenkora, N. K.; Danso, H. and Kheni, N. A. (2026) Principal component analysis of factors influencing the choice of procurement methods for the procurement of construction materials in Ghana. Engineering, Construction and Architectural Management, 33(7), pp. 5300-5317. ISSN 0969-9988

Obi, L; Arif, M and Goulding, J (2020) Low-cost housing: A cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(6), pp. 411-425. ISSN 1745-2007

Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.

Obieje, I D (2019) Improving the achievement of value for money in construction procurement under the Nigerian Public Procurement Act (2007). PhD thesis, University of Salford, UK.

Obonyo, E; Anumba, C and Thorpe, T (2005) Apron: An agent-based specification and procurement system for construction products. Engineering, Construction and Architectural Management, 12(4), pp. 329-350. ISSN 0969-9988

Obonyo, E A (2004) Apron: Agent-based specification and procurement of construction products. EngD thesis, Loughborough University, UK.

Obunwo, C; Chinyio, E and Suresh, S (2015) Relative contributions of project quality to customer satisfaction in Nigerian road construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ochieng, E G (2008) Framework for managing multi-cultural project teams. PhD thesis, Loughborough University, UK.

Odeh, A M (1992) CIPROS: Knowledge-based construction integrated project and process planning simulation system. PhD thesis, University of Michigan, USA.

Odeyinka, H; Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(3), pp. 203-221. ISSN 1366-4387

Odeyinka, H A (2003) The development and validation of models for assessing risk impacts on construction cash flow forecast. PhD thesis, Glasgow Caledonian University, UK.

Odeyinka, H A; Lowe, J and Kaka, A (2008) An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 13(1), pp. 5-17. ISSN 1366-4387

Odeyinka, H A; Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(5), pp. 423-439. ISSN 01446193

Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Odeyinka, H A; Lowe, J G and Kaka, A P (2002) A construction cost flow risk assessment model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387

Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599

Odusami, K T (2003) Criteria for measuring project performance by construction professionals in Nigerian construction industry. Journal of Financial Management of Property and Construction, 8(1), pp. 39-48. ISSN 1366-4387

Oechler, E; Molenaar, K R; Hallowell, M and Scott, S (2018) State-of-practice for risk-based quality assurance in state departments of transportation. Engineering, Construction and Architectural Management, 25(7), pp. 958-970. ISSN 0969-9988

Ofori, G and Kien, H L (2004) Translating Singapore architects' environmental awareness into decision making. Building Research & Information, 32(1), pp. 27-37. ISSN 0961-3218

Ogunsemi, D R and Aje, I O (2006) A model for contractors' selection in Nigeria. Journal of Financial Management of Property and Construction, 11(1), pp. 33-44. ISSN 1366-4387

Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364

Ohrn, L G and Schexnayder, C (1998) Performance-related specifications for highway construction. Journal of Construction Engineering and Management, 124(1), pp. 25-30. ISSN 0733-9364

Oke, A E; Aliu, J O; Tamunosa Ojurongbe, E; Aigbavboa, C O; Aghimien, D O and Ebekozien, A (2026) Investigation of core and future competencies needed for quantity surveyors in Nigeria. International Journal of Construction Education and Research, 22(1), pp. 119-137. ISSN 1557-8771

Okere, G O (2012) An investigative study of contract administration practices of general contractors on federal and state DOT projects. PhD thesis, Indiana State University, USA.

Okoyeh, I. I. and Ezezue, A. M. (2026) Assessment of noise levels in architectural design studios in universities in South-East Nigeria. International Journal of Building Pathology and Adaptation, 44(3), pp. 704-719. ISSN 2398-4708

Okudan, O; Cevikbas, M and Işık, Z (2025) Selection framework of disruption analysis methods for megaprojects: An integrated fuzzy multi-criteria decision-making approach. Engineering, Construction and Architectural Management, 32(1), pp. 59-86. ISSN 0969-9988

Okunola, A; Akanmu, A and Afolabi, A O (2025) Assessment of active back-support exoskeleton for carpentry task: Muscle activity and range of motion. Journal of Engineering, Design and Technology, 23(6), pp. 1797-1814. ISSN 1726-0531

Olabanji, O M and Mpofu, K (2020) Adopting hybridized multicriteria decision model as a decision tool in engineering design. Journal of Engineering, Design and Technology, 18(2), pp. 451-479. ISSN 1726-0531

Oladapo, A A (2007) A quantitative assessment of the cost and time impact of variation orders on construction projects. Journal of Engineering, Design and Technology, 5(1), pp. 35-48. ISSN 1726-0531

Oladokun, T T (2016) Effects of climate change on commercial properties in Lagos state, Nigeria. African Journal of Built Environment Research, 1(1), pp. 15-27. ISSN 2414-0236

Olanrewaju, A; Tan, Y Y and Soh, S N (2022) Defect characterisations in the Malaysian affordable housing. International Journal of Building Pathology and Adaptation, 40(4), pp. 539-568. ISSN 23984708

Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(3), pp. 281-295. ISSN 2044-124X

Olatokun, E O (2017) Requirement elicitation using knowledge capturing (kc) techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.

Olatokun, E O (2017) Requirement elicitation using knowledge capturing techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.

Olatunde, N A; Fidelis, I M; Awodele, I A and Adebayo, B O (2024) Stakeholders prioritization of key performance indicators on public and private tertiary educational projects in Osun State, Nigeria. International Journal of Building Pathology and Adaptation, 42(5), pp. 881-892. ISSN 2398-4708

Olatunji, O A and Akanmu, A (2015) BIM-FM and consequential loss: How consequential can design models be? Built Environment Project and Asset Management, 5(3), pp. 304-317. ISSN 2044-124X

Olatunji, O A; Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project's outturn costs. Built Environment Project and Asset Management, 8(4), pp. 358-371. ISSN 2044-124X

Olayiwola, J; Yusuf, A; Akanmu, A; Gonsalves, N and Abraham, Y (2024) Efficacy of annotated video-based learning environment for drawing students' attention to construction practice concepts. Journal of Construction Engineering and Management, 150(1): 04023155, ISSN 0733-9364

Olojede, B O; Opawole, A; Jagboro, G O and Alao, O O (2023) Examination of roles performed by public sector organizations in the procurement of public-private partnership projects. International Journal of Building Pathology and Adaptation, 41(2), pp. 495-511. ISSN 23984708

Olomolaiye, P O (1988) An evaluation of bricklayers' motivation and productivity. PhD thesis, Loughborough University, UK.

Oloufa, A A; Eltahan, A A and Papacostas, C S (1994) Integrated GIS for construction site investigation. Journal of Construction Engineering and Management, 120(1), pp. 211-222. ISSN 0733-9364

Olugboyega, O; Ejohwomu, O A and Omopariola, E D (2025) Examining the mediating roles of social malaise and religious manipulations in corruption manifestations: The case of the construction sector. Engineering, Construction and Architectural Management, 32(3), pp. 1457-1477. ISSN 0969-9988

Olukanni, E; Akanmu, A; Jebelli, H and Terreno, S (2024) Competencies for human-robot collaboration in the construction industry–academia’s perspective. International Journal of Construction Education and Research, 20(4), pp. 444-463. ISSN 1557-8771

Onaran, B E (1996) The construction of professional identity in architecture and landscape architecture: Convictions about skills, knowledge, and professional roles in design. PhD thesis, University of Wisconsin - Madison, USA.

Onyenobi, T; Hudson, J and Ormerod, M (2006) Impact of building geometry on fire spread rate. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Oo, B L; Abdul-Aziz, A R and Lim, Y M (2011) Information feedback and learning in construction bidding. Construction Economics and Building, 11(3), pp. 33-44. ISSN 2204-9029

Oo, B L; Lo, H P and Lim, B T H (2012) The effect of bidding success in construction bidding. Engineering, Construction and Architectural Management, 19(1), pp. 25-39. ISSN 0969-9988

Opawole, A (2018) Penalty mechanisms for enforcing concessionaire performance in public-private partnership contracts in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 161-191.

Orooji, F (2015) Risk-based wind loss and mitigation for residential wood framed construction. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Osei-Kyei, R and Chan, A P C (2018) Evaluating the project success index of public-private partnership projects in Hong Kong: The case of the Cross Harbour Tunnel. Construction Innovation, 18(3), pp. 371-391. ISSN 1471-4175

Osei-Kyei, R; Narbaev, T; Atafo-Adabre, M; Chileshe, N and Ofori-Kuragu, J K (2023) Critical success criteria for retirement village public: private partnership housing. Construction Innovation, 23(5), pp. 1018-1037. ISSN 1471-4175

Osipova, E and Eriksson, P E (2011) How procurement options influence risk management in construction projects. Construction Management and Economics, 29(11), pp. 1149-1158. ISSN 1466433X

Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure. PhD thesis, University of California, Davis, USA.

Oswald, D; Sherratt, F and Smith, S D (2017) An investigation into a health & safety rewards system on a large construction project. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Otegbulu, A C; Osagie, J U and Famuyiwa, F (2009) A value hierarchy study of building services/components in commercial and residential developments: A comparative analysis. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.

Othman, N (1997) Management of variations in construction contracts. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599

Ovararin, N (2001) Quantifying productivity loss due to field disruptions in masonry construction. PhD thesis, University of Texas at Austin, USA.

Owolabi, A (2004) Development of an integrated product information management system. EngD thesis, Loughborough University, UK.

Owusu-Manu, D G; Babon-Ayeng, P; Kissi, E; Edwards, D J; Okyere-Antwi, D and Elgohary, H (2023) Green construction and environmental performance: An assessment framework. Smart and Sustainable Built Environment, 12(3), pp. 565-583. ISSN 2046-6099

Oyedele, L O; Wai Tham, K; Jaiyeoba, B E and Fadeyi, M O (2003) Model for predicting architect's performance in building delivery process. Journal of Engineering, Design and Technology, 1(2), pp. 168-186. ISSN 1726-0531

Oyewole, M O; Komolafe, M O and Gbadegesin, J T (2023) Understanding stakeholders' opinion and willingness on the adoption of sustainable residential property features in a developing property market. International Journal of Construction Management, 23(2), pp. 358-370. ISSN 1562-3599

Oyeyipo, O; Adeyemi, B; Osuizugbo, I and Ojelabi, R (2022) Service quality of building services consultants in building project delivery; clients' perspectives. International Journal of Construction Management, 22(15), pp. 2886-2894. ISSN 1562-3599

Ozdemir, B and Kumral, M (2017) Stochastic assessment of the material haulage efficiency in the earthmoving industry. Journal of Construction Engineering and Management, 143(8): 05017013, ISSN 0733-9364

O’Brien, J J; Kreitzberg, F C and Mikes, W F (1985) Network scheduling variations for repetitive work. Journal of Construction Engineering and Management, 111(2), pp. 105-116. ISSN 0733-9364

O’Connor, J T; Hugo, F and Stamm, E M (1991) Improving highway specifications for constructibility. Journal of Construction Engineering and Management, 117(2), pp. 242-258. ISSN 0733-9364

O’Connor, J T; Rusch, S E and Schulz, M J (1987) Constructability concepts for engineering and procurement. Journal of Construction Engineering and Management, 113(2), pp. 235-248. ISSN 0733-9364

O’connor, J T and Caraway, P H (1993) Need for specification format that accommodates engineered projects. Journal of Construction Engineering and Management, 119(4), pp. 757-768. ISSN 0733-9364

Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387

Pan, J; Anumba, C J and Ren, Z (2004) Potential application of the semantic web in construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Pan, W and Gibb, A G F (2009) Maintenance performance evaluation of offsite and in situ bathrooms. Construction Innovation, 9(1), pp. 7-21. ISSN 1471-4175

Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(5), pp. 461-475. ISSN 0969-9988

Panas, A and Pantouvakis, J P (2018) On the use of learning curves for the estimation of construction productivity. International Journal of Construction Management, 18(4), pp. 301-309. ISSN 1562-3599

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Papamichael, K (1999) Application of information technologies in building design decisions. Building Research & Information, 27(1), pp. 20-34. ISSN 0961-3218

Pararajasingam, R; Waidyasekara, A S and Victar, H C (2026) Exploring causes of ineffective material management and impact on successful project deliverables in civil engineering construction projects in Sri Lanka. Construction Innovation, 26(1), pp. 22-43. ISSN 1471-4175

Parchami Jalal, M; Yavari Roushan, T; Noorzai, E and Alizadeh, M (2020) A BIM-based construction claim management model for early identification and visualization of claims. Smart and Sustainable Built Environment, 10(2), pp. 227-257. ISSN 2046-6099

Parchamijalal, M; Moradi, S and Zabihi Shirazi, M (2023) Claim management office maturity model (cmomm) in project-oriented organizations in the construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 74-104. ISSN 0969-9988

Park, M; Lee, M H; Lee, H S and Hwang, S (2010) Boost, control, or both of Korean housing market: 831 countermeasures. Journal of Construction Engineering and Management, 136(6), pp. 693-701. ISSN 0733-9364

Parkhurst, G and Parnaby, R (2008) Growth in mobile air-conditioning: A socio-technical research agenda. Building Research & Information, 36(4), pp. 351-362. ISSN 0961-3218

Parkin, A; Herrera, M and Coley, D A (2020) Net-zero buildings: When carbon and energy metrics diverge. Buildings & Cities, 1(1), pp. 86-99. ISSN 2632-6655

Parkinson, T and de Dear, R (2017) Thermal pleasure in built environments: Spatial alliesthesia from air movement. Building Research & Information, 45(3), pp. 320-335. ISSN 0961-3218

Parra, H A; Zuñiga-Collazos, A and Cruz-Caicedo, L F (2023) Impact of external risks on international construction projects success: Evidence from commonwealth caribbean islands. Journal of Construction in Developing Countries, 28(1), pp. 113-132. ISSN 1823-6499

Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.

Patel, A J (1996) Development of fatigue based pay adjustment factors in performance-related specifications for full-depth asphalt concrete pavements. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Patel, D J and Patel, D A (2025) Development of demolition project hazard index using the possibility approach. International Journal of Construction Management, 25(3), pp. 301-311. ISSN 1562-3599

Paterson, Ian (1981) Contractors' risk and insurance in the Australian building industry. PhD thesis, University of New South Wales, Australia.

Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.

Pearson, A D (2014) An investigation of climatically responsive ultra-low energy housing in rural Scotland: a case study. PhD thesis, University of Dundee, UK.

Peat, M (2009) Promotion of materials and products with sustainable credentials. Architectural Engineering and Design Management, 5(1-2), pp. 46-52. ISSN 1745-2007

Peel, J; Ahmed, V and Saboor, S (2020) An investigation of barriers and enablers to energy efficiency retrofitting of social housing in London. Construction Economics and Building, 20(2), pp. 127-149. ISSN 2204-9029

Pennington, D E (1977) A cost analysis of the construction management method of school facility construction. EdD thesis, Indiana University, USA.

Pereira, P F; Ramos, N M M and Simões, M L (2020) Data-driven occupant actions prediction to achieve an intelligent building. Building Research & Information, 48(5), pp. 485-500. ISSN 0961-3218

Perera, B A K S; Ekanayake, B J; Jayalath, C and Jayathilaka, G R H (2021) A study on variation-specific disputes that arise in road projects in Sri Lanka: A qualitative approach. International Journal of Construction Management, 21(6), pp. 571-581. ISSN 1562-3599

Perera, B A K S; Sirimewan, D C and Senadeera, A D (2021) Management of variations in the public-sector building construction projects in Sri Lanka. Journal of Engineering, Design and Technology, 19(6), pp. 1601-1619. ISSN 1726-0531

Perkins, R A (2009) Sources of changes in design: build contracts for a governmental owner. Journal of Construction Engineering and Management, 135(7), pp. 588-593. ISSN 0733-9364

Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.

Pesantes-Tavares, E R (2011) Construction worker health: A web-based approach to selecting alternatives to hazardous procedures. PhD thesis, University of Florida, USA.

Pham, S V H and Nguyen, K V T (2025) Performance review of RTI IMS software for automatic road surface damages identification. International Journal of Construction Management, 25(4), pp. 439-455. ISSN 1562-3599

Pheng, L S (1993) The rationalization of quality in the construction industry: Some empirical findings. Construction Management and Economics, 11(4), pp. 247-259. ISSN 01446193

Philips-Ryder, M; Zuo, J and Jin, X H (2013) Evaluating document quality in construction projects: subcontractors' perspective. International Journal of Construction Management, 13(3), pp. 77-94. ISSN 1562-3599

Phua, F T T (2006) Predicting construction firm performance: An empirical assessment of the differential impact between industry- and firm-specific factors. Construction Management and Economics, 24(3), pp. 309-320. ISSN 01446193

Piao, Y (2020) Case studies to determine the effect of applying blockchain technology and building information modeling on the workflow of water infrastructure projects. PhD thesis, Stanford University, USA.

Pin, T H and Scott, W F (1994) Bidding model for refurbishment work. Journal of Construction Engineering and Management, 120(2), pp. 257-273. ISSN 0733-9364

Pinero, J C (2003) A framework for monitoring performance-based road maintenance. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Ping Ho, S; Lin, Y H; Wu, H L and Chu, W (2009) Empirical test of a model for organizational governance structure choices in construction joint ventures. Construction Management and Economics, 27(3), pp. 315-324. ISSN 1466433X

Pirooz Far Poorang, A E (2008) Mass-constomisation: The application on design, fabrication and implementation (DFI) processes of building envelopes. PhD thesis, University of Sheffield, UK.

Pittri, H; Agyekum, K; Kukah, A S; Asamoah, E; Gasue, R and Botchway, B (2026) Adoption strategies for health and safety technologies in the construction industry. Construction Economics and Building, 26(1), ISSN 2204-9029

Plugge, P W (2007) An evidence-based comparison of construction project delivery. PhD thesis, Colorado State University, USA.

Pocobelli, D P (2021) Heritage building information model (BIM) for scientific data. PhD thesis, University College London, UK.

Pogorelskiy, S (2024) BIM-based methods for optimizing the design and maintenance of telecommunications infrastructure in data centres. PhD thesis, Debreceni Egyetem, Hungary.

Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364

Ponnaluru, S S; Marsh, T L and Brady, M (2012) Spatial price analysis of used construction equipment: The case of excavators. Construction Management and Economics, 30(11), pp. 981-994. ISSN 1466433X

Popovic, D (2020) The development and use of product platforms in single-family industrialized house building. PhD thesis, Jönköping University, Sweden.

Porwal, A; Parsamehr, M; Szostopal, D; Ruparathna, R and Hewage, K (2023) The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. International Journal of Construction Management, 23(1), pp. 156-166. ISSN 1562-3599

Poshdar, M; González, V A; Raftery, G M and Orozco, F (2014) Characterization of process variability in construction. Journal of Construction Engineering and Management, 140(11): 5014009, ISSN 0733-9364

Posillico, J J (2023) Development of an interpersonally grounded construction management curriculum foundation model. PhD thesis, Birmingham City University, UK.

Poulsom, M W (2017) S.62 LPA 1925: Restating the case for reform. International Journal of Law in the Built Environment, 9(1), pp. 79-91. ISSN 1756-1450

Pozzer, A E; Rausch, C and Leite, F (2025) Methodology for evaluating the uncertainty of embodied carbon assessments in construction projects across project phases. Journal of Construction Engineering and Management, 151(10): 04025158, ISSN 0733-9364

Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector. PhD thesis, University of the West of England, Bristol, UK.

Prakash, A (2019) Smart cities mission in India: Some definitions and considerations. Smart and Sustainable Built Environment, 8(4), pp. 322-337. ISSN 2046-6099

Pramudya, A A and Wibowo, A (2022) Ranking risks of BOT toll road investment projects in Indonesia using fuzzy interpretive structural modelling. Construction Economics and Building, 22(4), pp. 59-80. ISSN 2204-9029

Prasad, K V; Vasugi, V; Venkatesan, R and Bhat, N S (2019) Critical causes of time overrun in Indian construction projects and mitigation measures. International Journal of Construction Education and Research, 15(3), pp. 216-238. ISSN 1557-8771

Prasad K V; Vasugi V; Venkatesan R and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(1), pp. 58-78. ISSN 1366-4387

Prasertrungruang, T and Hadikusumo, B H W (2008) System dynamics modelling of machine downtime for small to medium highway contractors. Engineering, Construction and Architectural Management, 15(6), pp. 540-561. ISSN 0969-9988

Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.

Praticò, F G (2013) New road surfaces: Logical bases for simple quality-related pay adjustments. Journal of Construction Engineering and Management, 139(11): 4013020, ISSN 0733-9364

Praticò, F G; Antonio, C and Domenico, T (2012) Influence of dispersion and location on pay adjustment in construction engineering. Journal of Construction Engineering and Management, 138(10), pp. 1125-1130. ISSN 0733-9364

Praticò, F G; Casciano, A and Tramontana, D (2011) Pavement life-cycle cost and asphalt binder quality: Theoretical and experimental investigation. Journal of Construction Engineering and Management, 137(2), pp. 99-107. ISSN 0733-9364

Preston, M E (1980) A concrete mixing system: market analysis, design and testing. PhD thesis, Loughborough University, UK.

Price, A D F and Shawa, H H (1997) Risk and risk management in project related finance. Journal of Construction Procurement, 3(3), pp. 27-46. ISSN 1358-9180

Primdahl, M B; Forman, M; Frandsen, A F; Pihl, D and Nielsen, A K B (2022) Does the enactment of information and communications technology agreements in a digital construction organisation impact the mental work environment? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(4), pp. 350-358. ISSN 0969-9988

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) European construction contractors: A productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(2), pp. 221-230. ISSN 01446193

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Factors in formwork selection: A comparative investigation. Building Research & Information, 27(2), pp. 109-119. ISSN 0961-3218

Puddicombe, M S (1998) Interorganizational project strategy: contracts, contacts, and performance in the building industry. PhD thesis, Boston University, USA.

Puddicombe, M S (2009) Why contracts: Evidence. Journal of Construction Engineering and Management, 135(8), pp. 675-682. ISSN 0733-9364

Pugh, T E (1994) Design-construction interface performance on traditional capital improvement projects. PhD thesis, University of Texas at Austin, USA.

Pushpakumara, B H J; Gunasekara, M T and Gannile, Y M T D (2023) Variation of mechanical and chemical properties of old and new clay bricks. Journal of Construction Engineering and Management, 149(4): 04023006, ISSN 0733-9364

Queiroz, N; Fernandes, L and Fernando Oscar Ruttkay, P (2024) Comparison of fast daylighting climate-based simulation methods for parametric design: Two-phase, three-phase method and path tracing. Architectural Engineering and Design Management, 20(3), pp. 559-577. ISSN 1745-2007

Rachid, Z; Toufik, B and Mohammed, B (2019) Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), pp. 371-381. ISSN 1562-3599

Radzi, A R; K.S, A; Alias, A R; Algahtany, M and Rahman, R A (2025) Modeling the factors affecting workplace well-being at construction sites: a cross-regional multigroup analysis. Journal of Engineering, Design and Technology, 23(4), pp. 1087-1110. ISSN 1726-0531

Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364

Rahman, M M (2002) Joint risk management through transactionally efficient relational contracting. Construction Management and Economics, 20(1), pp. 45-54. ISSN 01446193

Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988

Rai, H; Jagannathan, M and Venkata Santosh Kumar, D (2021) Claim tenability assessment in Indian real estate projects using ann and decision tree models. Built Environment Project and Asset Management, 11(3), pp. 468-487. ISSN 2044-124X

Ramadan, R; Ghanem, H; Khatib, J M and ElKordi, A M (2025) Effect of plant-based natural fibers on the mechanical properties and volume change of cement paste. International Journal of Building Pathology and Adaptation, 43(4), pp. 693-711. ISSN 2398-4708

Rameezdeen, R and Rajapakse, C (2007) Contract interpretation: The impact of readability. Construction Management and Economics, 25(7), pp. 729-737. ISSN 1466433X

Rameezdeen, R and Rodrigo, A (2014) Modifications to standard forms of contract: The impact on readability. Construction Economics and Building, 14(2), pp. 31-40. ISSN 2204-9029

Ramos, N M M and De Freitas, V P (2009) Experimental determination of the hygroscopic inertia of building materials. Building Research & Information, 37(3), pp. 293-299. ISSN 0961-3218

Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.

Randall, T (2011) Construction engineering requirements for integrating laser scanning technology and building information modeling. Journal of Construction Engineering and Management, 137, pp. 797-805. ISSN 0733-9364

Randolph Thomas, H and Napolitan, C L (1995) Quantitative effects of construction changes on labor productivity. Journal of Construction Engineering and Management, 121(3), pp. 290-296. ISSN 0733-9364

Randolph Thomas, H; Smith, G R and Wirsching, S M (1995) Understanding defective specifications. Journal of Construction Engineering and Management, 121(1), pp. 55-65. ISSN 0733-9364

Ranslem, D (2015) 'Temporary' relocation: Spaces of contradiction in South African law. International Journal of Law in the Built Environment, 7(1), pp. 55-71. ISSN 1756-1450

Rao, G N (1997) Cost risk assessment in environmental remediation: Towards a causal-chain approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(2), pp. 253-267. ISSN 1562-3599

Rasch, S B (1985) An examination of the wage contour hypothesis: Wage leadership in the united states construction industry. PhD thesis, University of Kansas, USA.

Rashid, M J; Chowdhooree, I; Aziz, T and Hossain, M (2024) Determining the climate adaptive capacity of urban actors: A case study of Mongla port-town in Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 617-635. ISSN 1759-5916

Rashidi, A; Jazebi, F and Brilakis, I (2011) Neurofuzzy genetic system for selection of construction project managers. Journal of Construction Engineering and Management, 137(1), pp. 17-29. ISSN 0733-9364

Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708

Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708

Rauf, A; Attoye, D E and Crawford, R H (2024) Evaluating the impact of material service life on embodied energy of residential villas in the United Arab Emirates. Engineering, Construction and Architectural Management, 31(13), pp. 244-270. ISSN 0969-9988

Reischl, J N (2009) Toward a theory of morality: An empirical study of cognitive moral development in market channel dyads in the construction industry using the defining issues test. DBA thesis, Nova Southeastern University, USA.

Resalati, S; Kendrick, C C and Hill, C (2020) Embodied energy data implications for optimal specification of building envelopes. Building Research & Information, 48(4), pp. 429-445. ISSN 0961-3218

Rezaei, Mohammad (2019) Characterizing controlled low-strength materials (CLSM) for narrow-trench reinstatement. PhD thesis, University of Alberta, Canada.

Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.

Ribeiro, F L (1999) A case-based reasoning framework in value engineering. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Rich, D (2014) On-site application of self-compacting concrete. EngD thesis, Loughborough University, UK.

Riemer, J W (1975) On building buildings: The social organization of a transitional work setting. PhD thesis, University of New Hampshire, USA.

Rilett, L R (1998) Effect of variability on end product specifications. Journal of Construction Engineering and Management, 124(2), pp. 139-145. ISSN 0733-9364

Rilett, L R (1998) Identifying component variability of end product specification tests. Journal of Construction Engineering and Management, 124(2), pp. 133-138. ISSN 0733-9364

Riley, D R; Diller, B E and Kerr, D (2005) Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), pp. 953-962. ISSN 0733-9364

Roberts, W E (1985) An analysis of conflict arising between architects and school personnel when planning, designing, and constructing school facilities. EdD thesis, Northern Arizona University, USA.

Robinson, A; Gibb, A G and Austin, S A (2012) Standardisation of specification driven buildings with serial and repeat order designs. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(2), pp. 181-197. ISSN 1466433X

Rocha, C G D; Anzanello, M J and Gerchman, M (2018) Method to assess the match between clients' input and decoupling points in customized building projects. Journal of Construction Engineering and Management, 144(5): 04018018, ISSN 0733-9364

Rodrigues, C A (2017) Life-cycle environmental and cost assessment of building retrofits: Evaluating conventional and streamlined approaches. PhD thesis, Universidade de Coimbra, Portugal.

Rodrigues, M R and Lindhard, S M (2023) Benefits and challenges to applying IPD: Experiences from a Norwegian mega-project. Construction Innovation, 23(2), pp. 287-305. ISSN 1471-4175

Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988

Rojas, E M and Kell, I (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134(6), pp. 387-397. ISSN 0733-9364

Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-aware linear schedule optimization: A space-time constraint-satisfaction approach. Journal of Construction Engineering and Management, 143(5): 04016132, ISSN 0733-9364

Rosado, Lais Peixoto (2019) Life cycle assessment of construction and demolition waste management in a Brazilian watershed. PhD thesis, Universidade Estadual de Campinas, Brazil.

Rosander, L (2022) Same same but different: Dynamics of a pre-procurement routine and its influence on relational contracting models. Construction Management and Economics, 40(11-12), pp. 955-972. ISSN 01446193

Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: The influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(8), pp. 651-669. ISSN 01446193

Rose, T M and Manley, K (2012) Adoption of innovative products on Australian road infrastructure projects. Construction Management and Economics, 30(4), pp. 277-298. ISSN 1466433X

Rossetto, Daniel Marc (2024) Incentivising the recovery and utilisation of construction and demolition waste. PhD thesis, University of Adelaide, Australia.

Rotimi, F E (2013) An evaluative framework for defects in new residential buildings: The New Zealand case. PhD thesis, Auckland University of Technology, New Zealand.

Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.

Rowings, J E and Kaspar, S L (1991) Constructability of cable-stayed bridges. Journal of Construction Engineering and Management, 117(2), pp. 259-278. ISSN 0733-9364

Roy, S; Majumder, S; Bhattacharya, S and Sardar, I H (2021) Simulation and analysis of the effects of room surface reflectance combinations on a proposed retrofit illumination system of an office. Journal of Engineering, Design and Technology, 19(6), pp. 1620-1647. ISSN 1726-0531

Royal, S; Lehoux, N and Blanchet, P (2023) Comparative case study research: An international analysis of nine home warranty schemes. International Journal of Building Pathology and Adaptation, 41(4), pp. 789-824. ISSN 23984708

Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193

Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques. PhD thesis, Iowa State University, USA.

Ruff, C M; Dzombak, D A and Hendrickson, C T (1996) Owner-contractor relationships on contaminated site remediation projects. Journal of Construction Engineering and Management, 122(4), pp. 348-353. ISSN 0733-9364

Rukwaro, R W and Kieti, R M (2019) Spatial design parameters for residential extensions: The case of Buru Buru estate in Nairobi, Kenya. Architectural Engineering and Design Management, 15(1), pp. 29-47. ISSN 1745-2007

Runeson, K G (1988) Methodology and method for price-level forecasting in the building industry. Construction Management and Economics, 6(1), pp. 49-55. ISSN 01446193

Rupasinghe, C S and De Silva Weliange, S (2024) Climate change adaptation and mitigation at individual level: Knowledge and attitudes among school teachers in Kalutara district. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 395-408. ISSN 1759-5916

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Russell, M M; Howell, G; Hsiang, S M and Liu, M (2013) Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10): 04013008, ISSN 0733-9364

Russell, M M; Hsiang, S M; Liu, M and Wambeke, B (2014) Causes of time buffer and duration variation in construction project tasks: Comparison of perception to reality. Journal of Construction Engineering and Management, 140(6): 4014016, ISSN 0733-9364

Russell, M M; Liu, M; Howell, G and Hsiang, S M (2015) Case studies of the allocation and reduction of time buffer through use of the last planner system. Journal of Construction Engineering and Management, 141(2): 04014068, ISSN 0733-9364

Russell, M M; Liu, M and Hsiang, S M (2015) Planning for uncertainty: Use of structural equation modelling to determine the causal structure of time buffer allocation. Construction Management and Economics, 33(10), pp. 783-798. ISSN 01446193

Ryan, E C (1998) Devising contract terms in construction contracts to produce efficient performance. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Ryan, E C (2001) An economic analysis of the standard construction contract. PhD thesis, King's College London, UK.

Sacks, R; Seppänen, O; Priven, V and Savosnick, J (2017) Construction flow index: A metric of production flow quality in construction. Construction Management and Economics, 35(1-2), pp. 45-63. ISSN 01446193

Sadat, H and Thomas, N (2025) An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects. International Journal of Construction Management, 25(6), pp. 624-634. ISSN 1562-3599

Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.

Saeed, A M; Duffield, C and Hui, F K P (2018) An enhanced framework for assessing the operational performance of public-private partnership school projects. Built Environment Project and Asset Management, 8(2), pp. 194-214. ISSN 2044-124X

Safa, M; Shahi, A; Haas, C T and Hipel, K W (2017) Construction contract management using value packaging systems. International Journal of Construction Management, 17(1), pp. 50-64. ISSN 1562-3599

Safari, K and Ghandehariun, S (2026) An integrative BIM-based life cycle assessment framework to address uncertainties: A mixed-methods study under real construction project context. International Journal of Construction Management, 26(1), pp. 54-75. ISSN 1562-3599

Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988

Sahu, V; Attri, R; Gupta, P and Yadav, R (2020) Development of eco friendly brick using water treatment plant sludge and processed tea waste. Journal of Engineering, Design and Technology, 18(3), pp. 727-738. ISSN 1726-0531

Sajadfar, Narges (2022) Application of machine learning to automate classification and information extraction in industrial construction documents. PhD thesis, University of Alberta, Canada.

Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.

Salama, M and Habib, A P (2009) Investigating the causes of variation within the construction projects in UAE. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Salama, M; Kaka, A and Leishman, C (2005) The relationship between the performance of the economy and the cost of construction of educational buildings in Egypt: A preliminary study. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Salas, R I (2020) Empirical evaluation of construction safety: Insights from economic trends, national cultures and workplace injury rates. PhD thesis, University of Colorado at Boulder, USA.

Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.

Saleki, S and Bahramani, S K (2019) Designing a low-carbon building via lcb method 3.0, case study: An educational building in Tehran. Journal of Construction in Developing Countries, 23(2), pp. 129-150. ISSN 1823-6499

Salhab, D; Lindhard, S M and Hamzeh, F (2024) Schedule compression and emerging waste in construction: An assessment of overlapping activities. Engineering, Construction and Architectural Management, 31(12), pp. 4920-4941. ISSN 0969-9988

Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364

Salih, F and El-Adaway, I H (2024) Quantifying the impact of technology utilization on schedule and cost performance in construction projects. Journal of Construction Engineering and Management, 150(8): 04024078, ISSN 0733-9364

Salmalian, K; Alijani, A and Ramezannejad Azarboni, H (2023) An analogy between analytical, approximate and numerical methods in nonlinear buckling of functionally graded columns. Journal of Engineering, Design and Technology, 21(3), pp. 883-901. ISSN 1726-0531

Salter, M (1989) Planning systems for small firms. PhD thesis, Sheffield Hallam University, UK.

Sami Kashkooli, A M (2013) A critical building lifecycle assessment framework for building designers and decision makers. PhD thesis, University of Sheffield, UK.

Sami Ur Rehman, M; Shafiq, M T; Ullah, F and Galal Ahmed, K (2023) A critical appraisal of traditional methods of construction progress monitoring. Built Environment Project and Asset Management, 13(6), pp. 830-845. ISSN 2044-124X

Sammour, F; Xu, J; Wang, X; Hu, M and Zhang, Z (2026) Responsible AI in construction safety: Systematic evaluation of large language models and prompt engineering. Journal of Construction Engineering and Management, 152(1): 04025217, ISSN 0733-9364

Sandanayake, M; Kumanayake, R and Peiris, A (2022) Environmental impact assessments during construction stage at different geographic levels: a cradle-to-gate analysis of using sustainable concrete materials. Engineering, Construction and Architectural Management, 29(4), pp. 1731-1752. ISSN 0969-9988

Sandanayake, M; Yang, W; Chhibba, N and Vrcelj, Z (2022) Residential building defects investigation and mitigation: a comparative review in Victoria, Australia, for understanding the way forward. Engineering, Construction and Architectural Management, 29(9), pp. 3689-3711. ISSN 0969-9988

Sandbhor, S and Botre, R (2014) Applying total interpretive structural modeling to study factors affecting construction labour productivity. Construction Economics and Building, 14(1), pp. 20-31. ISSN 2204-9029

Sanderford, A R; McCoy, A P and Keefe, M J (2018) Adoption of energy star certifications: Theory and evidence compared. Building Research & Information, 46(2), pp. 207-13. ISSN 0961-3218

Sandhyavitri, A (2022) Stochastic analyses for managing risk of delay in duri oil construction projects, Indonesia. International Journal of Construction Management, 22(4), pp. 711-731. ISSN 1562-3599

Sanga, S A (2020) Compliance with building material specifications among informal skilled construction workers in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 25(2), pp. 63-91. ISSN 1823-6499

Sanhudo, L; Poças Martins, J; Ramos, N M M; Almeida, R M S F; Rocha, A; Pinto, D; Barreira, E and Simões, M L (2021) BIM framework for the specification of information requirements in energy-related projects. Engineering, Construction and Architectural Management, 28(10), pp. 3123-3143. ISSN 0969-9988

Sankaran, B and O'Brien, W J (2018) Impact of CIM technologies and agency policies on performance for highway infrastructure projects. Journal of Construction Engineering and Management, 144(7): 04018052, ISSN 0733-9364

Sankaran, Bharathwaj (2017) Civil integrated management for highway infrastructure projects: Analyses of trends, specifications, impact, and maturity. PhD thesis, University of Texas at Austin, USA.

Sanna, F (2018) Timber modern methods of construction: a comparative study. PhD thesis, Edinburgh Napier University, UK.

Sanni-Anibire, M O and Adenle, Y A (2024) Residential satisfaction of vertical urban settlements in Hong Kong. Journal of Engineering, Design and Technology, 22(6), pp. 1705-1722. ISSN 1726-0531

Sanusi, I E (2019) Optimal and adaptive control frameworks using reinforcement learning for time-varying dynamical systems. PhD thesis, University of Sheffield, UK.

Sarireh, M (2023) Testing the use of volcanic tuff in base and sub-base pavement construction in Jordan. International Journal of Construction Management, 23(1), pp. 126-134. ISSN 1562-3599

Sarisley, E F (1990) Construction methods and costs of stress-laminated timber bridges. Journal of Construction Engineering and Management, 116(3), pp. 432-447. ISSN 0733-9364

Sayed, E (2022) Biomimetic intelligence for systemic innovation in the built environment. PhD thesis, University of Northumbria at Newcastle, UK.

Scales, Jeffrey G (2021) Including generative mechanisms in project scheduling using hybrid simulation. PhD thesis, University of Technology Sydney, Australia.

Schamne, Annelise Nairne (2022) Building information modeling in construction waste management: Proposal of a conceptual model in the IFC standard. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.

Schexnayder, C and Ohrn, L G (1997) Highway specifications: quality versus pay. Journal of Construction Engineering and Management, 123(4), pp. 437-443. ISSN 0733-9364

Schmitt, R L (1998) Development of statistically based methods to determine QC/QA testing levels for hot-mix asphalt construction. PhD thesis, University of Wisconsin - Madison, USA.

Schneider, K (2023) Three essays on investment-based asset pricing. PhD thesis, University of Manchester, UK.

Schoenwitz, M; Naim, M and Potter, A (2012) The nature of choice in mass customized house building. Construction Management and Economics, 30(3), pp. 203-219. ISSN 1466433X

Schweber, L. and Green, M. (2026) Negotiating net-zero carbon: An ant analysis of two buildings. Buildings & Cities, 7(1), pp. 791-807. ISSN 2632-6655

Schweber, L (2013) The effect of BREEAM on clients and construction professionals. Building Research & Information, 41(2), pp. 129-145. ISSN 0961-3218

Schweber, L and Haroglu, H (2014) Comparing the fit between BREEAM assessment and design processes. Building Research & Information, 42(3), pp. 300-317. ISSN 0961-3218

Scognamiglio, A (2014) Essays in labor economics and political economy. PhD thesis, Massachusetts Institute of Technology, USA.

Scott, D (1997) An intelligent approach to the engineering management of housing subsidence cases. PhD thesis, Teesside University, UK.

Scott, D and Anumba, C J (1996) An intelligent approach to the engineering management of subsidence cases. Engineering, Construction and Architectural Management, 3(3), pp. 233-248. ISSN 0969-9988

Scott, D and Kagiri, M (1992) Choosing the most appropriate method of construction with computer assistance. Construction Management and Economics, 10(2), pp. 153-177. ISSN 01446193

Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(6), pp. 945-961. ISSN 0969-9988

Seed, L (2015) The dynamics of BIM adoption: a mixed methods study of BIM as an innovation within the United Kingdom construction industry. PhD thesis, University of Huddersfield, UK.

Selinger, S (1983) Payment timing as a factor in bid evaluation. Journal of Construction Engineering and Management, 109(3), pp. 335-341. ISSN 0733-9364

Senouci, A; Alsarraj, A; Gunduz, M and Eldin, N (2017) Analysis of change orders in Qatari construction projects. International Journal of Construction Management, 17(4), pp. 280-292. ISSN 1562-3599

Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.

Serag, E; Oloufa, A; Malone, L and Radwan, E (2010) Model for quantifying the impact of change orders on project cost for U.S. roadwork construction. Journal of Construction Engineering and Management, 136(9), pp. 1015-1027. ISSN 0733-9364

Seymour, D and Low, S P (1990) The quality debate. Construction Management and Economics, 8(1), pp. 13-29. ISSN 01446193

Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(2), pp. 141-153. ISSN 2044-124X

Sha'ar, K. Z.; Assaf, S. A.; Bambang, T.; Babsail, M. and Fattah, A. M. A. E. (2017) Design-construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599

Sha'ar, K Z; Assaf, S A; Bambang, T; Babsail, M and Fattah, A M A E (2017) Design–construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), pp. 238-250. ISSN 1562-3599

Shabani Ardakani, S and Nik-Bakht, M (2021) Functional evaluation of change order and invoice management processes under different procurement strategies: Social network analysis approach. Journal of Construction Engineering and Management, 147(1): 1974, ISSN 0733-9364

Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.

Shafaat, A; Marbouti, F and Mahfouz, T (2023) Early warning system for highway construction projects using GA-SVM. International Journal of Construction Management, 23(14), pp. 2348-2357. ISSN 1562-3599

Shafabakhsh, G; Kashi, E and Tahani, M (2018) Analysis of runway pavement response under aircraft moving load by FEM. Journal of Engineering, Design and Technology, 16(2), pp. 233-243. ISSN 1726-0531

Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.

Shahandashti, M; Ashuri, B and Mostaan, K (2018) Automatic fault detection for building integrated photovoltaic (BIPV) systems using time series methods. Built Environment Project and Asset Management, 8(2), pp. 160-170. ISSN 2044-124X

Shahandashti, S M and Ashuri, B (2013) Forecasting Engineering News-Record construction cost index using multivariate time series models. Journal of Construction Engineering and Management, 139(9), pp. 1237-1243. ISSN 0733-9364

Shahhosseini, V and Hajarolasvadi, H (2021) A conceptual framework for developing a BIM-enabled claim management system. International Journal of Construction Management, 21(2), pp. 208-222. ISSN 1562-3599

Shammas-Toma, M; Seymour, D E and Clark, L (1996) The effectiveness of formal quality management systems in achieving the required cover in reinforced concrete. Construction Management and Economics, 14(4), pp. 353-364. ISSN 01446193

Shan, Y (2014) Integrated information modeling of construction project productivity. PhD thesis, University of Colorado at Boulder, USA.

Shapira, A and Schexnayder, C J (1999) Selection of mobile cranes for building construction projects. Construction Management and Economics, 17(4), pp. 519-527. ISSN 01446193

Shar, B K (2002) Application of it to improve the design process in the construction sector of Pakistan: A case of the specification management process. PhD thesis, University of Newcastle upon Tyne, UK.

Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships. PhD thesis, University of Maryland, College Park, USA.

Sharma, N K; Hargreaves, T and Pallett, H (2023) Social justice implications of smart urban technologies: An intersectional approach. Buildings & Cities, 4(1), pp. 315-333. ISSN 2632-6655

Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.

Shearman, J; Hughes, W P; Gilchrist, R and Elwazani, S (2005) Strategies for reducing construction problems on archaeological sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Shehab, T; Moselhi, O and Nasr, E (2009) Barcode-assisted system for document management of construction projects. International Journal of Construction Education and Research, 5(1), pp. 45-60. ISSN 1557-8771

Shehadeh, A; Alshboul, O and Hamedat, O (2022) Risk assessment model for optimal gain-pain share ratio in target cost contract for construction projects. Journal of Construction Engineering and Management, 148(2): 04021197, ISSN 0733-9364

Shelbourn, M (2002) Using computer-aided-learning to train inexperienced surveyors in diagnosing defects in buildings. PhD thesis, University of Salford, UK.

Sherratt, F S (2012) Constructing safety on sites: an exploration of the social construction of safety on large UK construction sites. PhD thesis, University of Bolton, UK.

Shetterly, D R (1998) The influence of contract design on contractor performance: A multivariate analysis. PhD thesis, University of Maryland, Baltimore County, USA.

Shi, J J; Cheung, S O and Arditi, A (2001) Construction delay computation method. Journal of Construction Engineering and Management, 127(1), pp. 60-65. ISSN 0733-9364

Shibeika, A; Davies, R and Gray, C (2009) Care pathways and the built environment: Conceptual framework for understanding. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Shiers, D; Rapson, D; Roberts, C and Keeping, M (2006) Sustainable construction: The development and evaluation of an environmental profiling system for construction products. Construction Management and Economics, 24(11), pp. 1177-1184. ISSN 1466433X

Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364

Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.

Shipton, C (2013) Making changes: an ethnography of client changes on a construction project. PhD thesis, University of Reading, UK.

Shipworth, M; Firth, S K; Gentry, M I; Wright, A J; Shipworth, D T and Lomas, K J (2010) Central heating thermostat settings and timing: Building demographics. Building Research & Information, 38(1), pp. 50-69. ISSN 0961-3218

Shirley, C L M (2000) Firm inventory behavior and the returns from infrastructure investment. PhD thesis, University of California, Berkeley, USA.

Shoar, S; Yiu, T W; Payan, S and Parchamijalal, M (2023) Modeling cost overrun in building construction projects using the interpretive structural modeling approach: A developing country perspective. Engineering, Construction and Architectural Management, 30(2), pp. 365-392. ISSN 0969-9988

Shohet, I M and Paciuk, M (2006) Service life prediction of exterior cladding components under failure conditions. Construction Management and Economics, 24(2), pp. 131-148. ISSN 01446193

Shohet, I M and Perelstein, E (2004) Decision support model for the allocation of resources in rehabilitation projects. Journal of Construction Engineering and Management, 130(2), pp. 249-257. ISSN 0733-9364

Shoniwa, Kuda John (2024) The use of integrated project delivery (IPD) to reduce construction claims in South African mining capital projects. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Shooshtarian, S; Lingard, H and Wong, P S P (2020) Using the cost of construction work to trigger legislative duties for WHS: The Australian experience. Built Environment Project and Asset Management, 10(3), pp. 369-387. ISSN 2044-124X

Shooshtarian, S and Ridley, I (2016) Determination of acceptable thermal range in outdoor built environments by various methods. Smart and Sustainable Built Environment, 5(4), pp. 352-371. ISSN 2046-6099

Short, C A; Song, J; Mottet, L; Chen, S; Wu, J and Ge, J (2018) Challenges in the low-carbon adaptation of China's apartment towers. Building Research & Information, 46(8), pp. 899-930. ISSN 0961-3218

Showalter, W E and Halpin, D W (2008) Dynamic programming approach to optimization of site remediation. Journal of Construction Engineering and Management, 134(10), pp. 820-827. ISSN 0733-9364

Shrestha, K (2016) Framework of performance-based contracting for chip seal and striping maintenance activities. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, K K (2016) Causes of change orders and its impact on road maintenance contracts. PhD thesis, University of Nevada, Las Vegas, USA.

Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364

Shrestha, P P (2007) Performance benchmarking of large highway projects. PhD thesis, University of Texas at Austin, USA.

Shrestha, P P and Fernane, J D (2017) Performance of design-build and design-bid-build projects for public universities. Journal of Construction Engineering and Management, 143(3): 04016101, ISSN 0733-9364

Shrestha, P P; O'Connor, J T and Gibson Jr, G E (2012) Performance comparison of large design-build and design-bid-build highway projects. Journal of Construction Engineering and Management, 138(1), pp. 1-13. ISSN 0733-9364

Shrestha, P P; Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(6), pp. 1087-1104. ISSN 0969-9988

Shrestha, R; Ko, T and Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4): 04025017, ISSN 0733-9364

Shrestha, Rabin (2024) Prediction of cost and schedule changes in transportation projects through historical bid and change order document analysis – using Oklahoma dot project cases. PhD thesis, University of Nevada, Las Vegas, USA.

Shrivas, A and Singla, H K (2022) Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach. International Journal of Construction Management, 22(8), pp. 1455-1463. ISSN 1562-3599

Shugran, A A and Ghazali, F E M (2025) Understanding the effects of variation orders on construction project success: insights from the Jordanian context. International Journal of Construction Management, 25(5), pp. 519-529. ISSN 1562-3599

Shuster, W D; Burkman, C E; Grosshans, J; Dadio, S and Losco, R (2015) Green residential demolitions: Case study of vacant land reuse in storm water management in cleveland. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Siddiqui, A A (2019) An investigation into data sharing between building information modelling and fire safety engineering, with potential applications to smart buildings. PhD thesis, University of Greenwich, UK.

Siebelink, S; Voordijk, H J T; Endedijk, M D and Adriaanse, A M (2025) Exploring strategies for managing maturity variations among project partners: From underperformance and controlling weak links to stretching capabilities. Construction Management and Economics, 43(4), pp. 243-261. ISSN 0144-6193

Siebelink, Sander (2021) Maturities in building information modelling: A multi-level perspective. PhD thesis, University of Twente, Netherlands.

Siew, R Y J (2016) Assessing the readiness of sustainability reporting tools (SRTs) for an age-friendly built environment. Journal of Financial Management of Property and Construction, 21(2), pp. 122-136. ISSN 1366-4387

Siew, Yung (2014) Evaluating and enhancing the impact of sustainability reporting tools (SRTs). PhD thesis, University of New South Wales, Australia.

Sikorsky, C S (1990) Product and process integration for the US design-construction industry. PhD thesis, Texas A&M University, USA.

Simpson, S; Banfill, P; Haines, V; Mallaband, B and Mitchell, V (2016) Energy-led domestic retrofit: Impact of the intervention sequence. Building Research & Information, 44(1), pp. 97-115. ISSN 0961-3218

Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.

Singh, A (2017) Corporate social responsibility in construction firms operating in the UK. PhD thesis, University of Reading, UK.

Singh, A; Adachi, S and Inouye, M (2011) Quality control analysis of downtime and time to repair for water supply pipes. Built Environment Project and Asset Management, 1(1), pp. 75-90. ISSN 2044-124X

Singh, A; Connaughton, J and Davies, R (2015) Making sense of corporate social responsibility strategies in construction organisations in the UK. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Skinner, D W H (1974) An investigation of the contractor's use of bills of quantities. PhD thesis, Aston University, UK.

Skinner, D W H (1979) An analysis of the utility of bills of quantities in the process of building contracting. PhD thesis, Aston University, UK.

Skitmore, M and Cheung, F K T (2007) Explorations in specifying construction price forecast loss functions. Construction Management and Economics, 25(5), pp. 449-465. ISSN 1466433X

Skitmore, M and Ng, S T (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460. ISSN 0733-9364

Small, E P (1999) Development of a methodology for the integration of seismic risk mitigation activities in project and network level bridge management systems. PhD thesis, State University of New York at Buffalo, USA.

Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.

Smith, G R and Roth, R D (1991) Safety programs and the construction manager. Journal of Construction Engineering and Management, 117(2), pp. 360-371. ISSN 0733-9364

Sobieraj, J and Metelski, D (2023) Identification of the key investment project management factors in the housing construction sector in Poland. International Journal of Construction Management, 23(1), pp. 1-12. ISSN 1562-3599

Sobuz, M H R; Meraz, M M; Saha, A; Akid, A S M; Hasan, N M S; Rahman, M and Safayet, M A (2024) Performance assessment of various seismic resistant systems for a multistory structure in different seismic zones of Bangladesh. Journal of Engineering, Design and Technology, 22(3), pp. 718-738. ISSN 1726-0531

Sohn, T (2009) Determining durations for right-of-way acquisition and utility adjustment on highway projects. PhD thesis, University of Texas at Austin, USA.

Soltanifar, M (2020) A framework to improve the performance of public tender evaluation procedures in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Sommerville, J (2011) Ethical views of micro-enterprises delivering project and asset management services in West-Central Scotland. Built Environment Project and Asset Management, 1(1), pp. 91-103. ISSN 2044-124X

Sompolgrunk, A; Banihashemi, S and Mohandes, S R (2023) Building information modelling (BIM) and the return on investment: A systematic analysis. Construction Innovation, 23(1), pp. 129-154. ISSN 1471-4175

Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes. PhD thesis, Columbia University, USA.

Song, X; Peña-Mora, F; Menassa, C C and Arboleda, C A (2012) Insurance as a risk management tool for ADR implementation in construction disputes. Journal of Construction Engineering and Management, 138(1), pp. 14-21. ISSN 0733-9364

Songer, A D and Ibbs, W C (1995) Managing requests for proposal development in public sector design-build. Journal of Construction Procurement, 1(1), pp. 64-80. ISSN 1358-9180

Songer, A D; Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(2), pp. 69-82. ISSN 1358-9180

Soni, M S M and Smallwood, J J (2024) Perceptions of corruption in the South African construction industry. International Journal of Construction Education and Research, 20(1), pp. 43-64. ISSN 15578771

Soo, A and Oo, B L (2010) The effect of information feedback in construction bidding. Construction Economics and Building, 10(1-2), pp. 65-75. ISSN 2204-9029

Soo, A and Oo, B L (2014) The effect of construction demand on contract auctions: An experiment. Engineering, Construction and Architectural Management, 21(3), pp. 276-290. ISSN 0969-9988

Soo, Alexander (2015) The effect of construction demand on inexperienced bidders' bidding behaviour. PhD thesis, University of Sydney, Australia.

Soon, C D (2009) Managing risk and uncertainty in transportation megaprojects. PhD thesis, University of Hawai'i at Manoa, USA.

Sourani, A and Sohail, M (2015) The Delphi method: Review and use in construction management research. International Journal of Construction Education and Research, 11(1), pp. 54-76. ISSN 1557-8771

Souza, Douglas Lopes de (2024) Natural language processing of technical standard for the construction sector the study of the nbr 15.575. PhD thesis, Universidade Estadual de Campinas, Brazil.

Spangenberg, S; Hannerz, H and Tüchsen, F (2005) Hospitalized injuries among bridge and tunnel construction workers. Construction Management and Economics, 23(3), pp. 237-240. ISSN 01446193

Sparkling, A E (2018) Collaborative project delivery practices, goal alignment, and performance in architecture, engineering, and construction project teams. PhD thesis, Michigan State University, USA.

Srivastava, A; Srivastava, D K and Misra, A K (2019) Spatial variability modeling and reliability analysis of flexible pavement through mechanistic–empirical model. Journal of Engineering, Design and Technology, 17(6), pp. 1129-1145. ISSN 1726-0531

Ssegawa, J K; Rwelamila, P D and Mogome, M G (2020) The challenges of closing construction projects final accounts in Botswana local authorities. Journal of Construction Business and Management, 4(1), pp. 13-23. ISSN 2521-0165

Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction. PhD thesis, University of Colorado at Boulder, USA.

Stanford, M S and Molenaar, K R (2018) Influence of simplified procurement methods on competition for public sector construction. Journal of Construction Engineering and Management, 144(2): 04017105, ISSN 0733-9364

Stanley, R and Thurnell, D (2014) The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Construction Economics and Building, 14(1), pp. 105-117. ISSN 2204-9029

Stella, C; Ceppi, G and D’Appolonia, E (1990) Temporary tunnel support using jet-grouted cylinders. Journal of Construction Engineering and Management, 116(1), pp. 35-53. ISSN 0733-9364

Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications. PhD thesis, KTH Royal Institute of Technology, Sweden.

Stephen, M and Picken, D (2000) Using risk analysis to determine construction project contingencies. Journal of Construction Engineering and Management, 126(2), pp. 130-136. ISSN 0733-9364

Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.

Stocks, S N and Singh, A (1999) Studies on the impact of functional analysis concept design on reduction in change orders. Construction Management and Economics, 17(3), pp. 251-267. ISSN 01446193

Stojanovic, V; Falconer, R; Blackwood, D; Paterson, G; Fleming, M and Bell, S (2014) Interactive visualisation of heat loss and gain for early-stage energy appraisal of the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Stone, M L; Johnson, P W and Leopard, T A (2011) Using design-based change orders as a lessons learned metric in university dormitory construction. International Journal of Construction Education and Research, 7(3), pp. 226-240. ISSN 1557-8771

Strachan, M E (2013) Energy-led, non-domestic building refurbishment: decision support for a whole-building approach to improvement of operational performance. PhD thesis, Heriot-Watt University, UK.

Stretton, Alan William (1977) The building industry and employment creation in Manila, The Philippines. PhD thesis, Australian National University, Australia.

Stringer, A; Dunne, J and Boussabaine, H (2012) Schools design quality: A user perspective. Architectural Engineering and Design Management, 8(4), pp. 257-272. ISSN 1745-2007

Sturts Dossick, C and Schunk, T K (2007) Subcontractor schedule control method. Journal of Construction Engineering and Management, 133(3), pp. 262-265. ISSN 0733-9364

Subramanyan, H; Sawant, P H and Bhatt, V (2012) Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India. Journal of Construction Engineering and Management, 138(3), pp. 409-421. ISSN 0733-9364

Sullivan, J; Asmar, M E; Chalhoub, J and Obeid, H (2017) Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6): 04017009, ISSN 0733-9364

Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.

Sultan, Mohamed (2025) PPP contracts for healthcare facilities in Canada: Qualitative study to identify lessons learned. PhD thesis, Arizona State University, USA.

Summa, S.; Mircoli, A.; Potena, D.; Ulpiani, G.; Diamantini, C. and Di Perna, C. (2022) Combining artificial intelligence and building engineering technologies towards energy efficiency: The case of ventilated façades. Construction Innovation, 24(7), pp. 44-64. ISSN 1471-4175

Summerfield, A J; Lowe, R J and Oreszczyn, T (2010) Two models for benchmarking UK domestic delivered energy. Building Research & Information, 38(1), pp. 12-24. ISSN 0961-3218

Sun, W (2000) Designing an object-oriented geographic information system application for integration of building construction project information. PhD thesis, University of Florida, USA.

Sun, Z (2000) Reliability-based method for stability of mine entry design and evaluation. PhD thesis, West Virginia University, USA.

Sunday, O A (2010) Impact of variation orders on public construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Sundqvist, J; Larsson, B and Lindahl, G (2007) Cooperation in the building sector between building material manufacturers and contractors to develop products. Construction Economics and Building, 7(2), pp. 45-53. ISSN 2204-9029

Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.

Suriyanon, N; Sutheerawatthana, P; Kaewmoracharoen, M and Klansai, V (2023) The utility and value of contract terms: A case study on interior contractors. Construction Economics and Building, 23(1-2), pp. 77-94. ISSN 2204-9029

Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.

Sutrisna, M and Potts, K (2002) Analysing typical factors for the early prediction of variations. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Sutrisna, M; Potts, K and Proverbs, D (2004) Quotation mechanism for pre-pricing variations in civil engineering projects: A quest for best practice. Journal of Financial Management of Property and Construction, 9(1), pp. 13-26. ISSN 1366-4387

Sutton, R M (2019) The development of a sustainable construction design process. PhD thesis, University of Liverpool, UK.

Swaffield, L M and Johnson, G A (2005) The financial benefits of implementing ISO 14001 within construction contracting organizations. Architectural Engineering and Design Management, 1(3), pp. 197-210. ISSN 1745-2007

Sweis, G J (2000) Impact of conversion technology on productivity in masonry construction. PhD thesis, Northwestern University, USA.

Sørensen, N L; Rasmussen, F N; Øien, T B and Frandsen, A K (2020) Holistic sustainability: Advancing interdisciplinary building design through tools and data in Denmark. Construction Economics and Building, 20(2), pp. 25-44. ISSN 2204-9029

Ta'i, Behnam (1994) Critical evaluation of stormwater management practices on urban construction sites in the Sydney region. PhD thesis, University of New South Wales, Australia.

Tabatabaei Sameni, S (2019) Overheating investigation in UK social housing flats built to the Passivhaus standard. PhD thesis, Coventry University, UK.

Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost. PhD thesis, University of Michigan, USA.

Taggart, M; Koskela, L and Rooke, J (2014) The role of the supply chain in the elimination and reduction of construction rework and defects: An action research approach. Construction Management and Economics, 32(7-8), pp. 829-842. ISSN 01446193

Taggart, M; Koskela, L K and Rooke, J A (2014) An improvement strategy for the defects and rework management process within an SME: An action research approach. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Taggart M, K L R R (2013) The role of the supply chain in elimination and reduction of construction rework and defects: An action research approach. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.

Taheri, Ali (2024) The framework of an infrastructure performance model based on the concepts of civil integrated management (CIM). PhD thesis, Florida State University, USA.

Tai, S; Zhang, Y and Li, T (2021) Factors affecting BIM application in China: A social network model. Journal of Engineering, Design and Technology, 19(2), pp. 373-384. ISSN 1726-0531

Tam, C M and Tong, T K L (2005) Multiple gmdh models for estimating resource requirements. Construction Innovation, 5(2), pp. 115-131. ISSN 1471-4175

Tam, C M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(2), pp. 120-136. ISSN 1471-4175

Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364

Tam, V W Y and Hao, J J L (2014) Prefabrication as a mean of minimizing construction waste on site. International Journal of Construction Management, 14(2), pp. 113-121. ISSN 1562-3599

Tam, V W Y and Shen, L Y (2010) On applications of an optimal price-time bidding model in Hong Kong foundation projects. Construction Innovation, 10(1), pp. 14-24. ISSN 1471-4175

Tam, V W Y and Zeng, S X (2014) Employee job satisfaction in engineering firms. Engineering, Construction and Architectural Management, 21(4), pp. 353-368. ISSN 0969-9988

Tan, S Y and Zainon, N (2023) Impact of COVID-19 pandemic on the quantity surveying practices in Malaysia. Engineering, Construction and Architectural Management, 30(8), pp. 3480-3508. ISSN 0969-9988

Tanaka, M (2008) Essays on durability and the Japanese housing market. PhD thesis, Johns Hopkins University, USA.

Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.

Tang, Z (2005) Developing complete conditional probability tables from fractional data for Bayesian belief networks in engineering decision making. PhD thesis, University of Toronto, Canada.

Tapper, H (1997) Welfare assessment of public investment in a CGE model. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Tatum, C B (1983) Decision-making in structuring construction project organizations. PhD thesis, Stanford University, USA.

Tatum, C B (1986) Potential mechanisms for construction innovation. Journal of Construction Engineering and Management, 112(2), pp. 178-191. ISSN 0733-9364

Tatum, C B and Fawcett, R P (1986) Organizational alternatives for large projects. Journal of Construction Engineering and Management, 112(1), pp. 49-61. ISSN 0733-9364

Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599

Taylor, M D; Fisher, A and Wamuziri, S C (2009) A comparison of modern methods of bathroom construction: A project case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Taylor, T R B; Uddin, M; Goodrum, P M; McCoy, A and Shan, Y (2012) Change orders and lessons learned: Knowledge from statistical analyses of engineering change orders on Kentucky highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1360-1369. ISSN 0733-9364

Tennant, S and Langford, D (2008) The construction project balanced scorecard. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Tesfagaber, G (2004) Application of PSL to construction process information specification and exchange. PhD thesis, Loughborough University, UK.

Thomas, H R (2000) Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4), pp. 261-267. ISSN 0733-9364

Thomas, H R; Rees, S W and Lloyd, R M (1996) Measured heat losses through a real ground floor slab. Building Research & Information, 24(1), pp. 15-26. ISSN 0961-3218

Thomas, H R; Smith, G R and Ponderlick, R M (1992) Resolving contract disputes based on misrepresentations. Journal of Construction Engineering and Management, 118(3), pp. 472-487. ISSN 0733-9364

Thomas, H R; Smith, G R and Wright, D E (1991) Legal aspects of oral change orders. Journal of Construction Engineering and Management, 117(1), pp. 148-162. ISSN 0733-9364

Thomas, H R and Završki, I (1999) Construction baseline productivity: Theory and practice. Journal of Construction Engineering and Management, 125(5), pp. 295-303. ISSN 0733-9364

Thompson, D E (2014) A study of building information modeling usage through the perceived utilization of facilities management training, building information modeling technical specifications, and a quality building information model for facilities management at higher educational institutions in Texas. PhD thesis, Texas A&M University, USA.

Thompson, M J (2023) Environmental sustainability of small wastewater treatment systems and pathways for improvement. PhD thesis, University of Nebraska - Lincoln, USA.

Thompson Jr., R C (2012) Risk measurement, allocation, and pricing in network schedule systems. PhD thesis, Catholic University of America, USA.

Thomson, C S; El-Haram, M A and Emmanuel, R (2009) Mapping knowledge during sustainability assessment within a PPP school project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Thomson, C S; El-Haram, M A; Hardcastle, C and Horner, R M W (2008) Developing an urban sustainability assessment protocol reflecting the project lifecycle. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Tiew, S Y (2025) Improving professional development through building contract administration (bca) framework of housing projects for graduate architects. Engineering, Construction and Architectural Management, 32(8), pp. 5272-5290. ISSN 0969-9988

Tiew, S Y (2025) A construction contract administration (cca) framework for graduate architects' professional development. Engineering, Construction and Architectural Management, 32(12), pp. 8056-8072. ISSN 0969-9988

Tinker, A and Burt, R (2004) "Greening" the construction curriculum. International Journal of Construction Education and Research, 1(1), pp. 26-33. ISSN 1557-8771

Tokarczyk, J A (2011) An examination of strategic challenges and opportunities in the wood-based building product industry. PhD thesis, Oregon State University, USA.

Tokede, O. O.; Weththasinghe, K. K.; Kumer Shill, S.; Wijayasundara, M. and Subhani, M. (2025) Comparative evaluation of different material options for moment-resisting framing systems in buildings. Architectural Engineering and Design Management, 21(6), pp. 1541-1561. ISSN 1745-2007

Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.

Toma, H. M.; Abdelazim, A. N. and Ibrahim, A. H. (2026) Assessment of estimation performance for activities' cost and time in construction projects using statistical process control. Engineering, Construction and Architectural Management, 33(4), pp. 2669-2695. ISSN 0969-9988

Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364

Tommelein, I D; Carr, R I and Odeh, A M (1994) Assembly of simulation networks using designs, plans, and methods. Journal of Construction Engineering and Management, 120(4), pp. 796-815. ISSN 0733-9364

Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364

Tomrukcu, G; Kizildag, H; Avgan, G; Dal, O; Ganic Saglam, N; Ozdemir, E and Ashrafian, T (2026) A systematic approach to manual calibration and validation of building energy simulation. Smart and Sustainable Built Environment, 15(1), pp. 203-230. ISSN 2046-6099

Tonini de Araújo, M; de Souza, H A and Gomes, A P (2022) Computer simulation of moisture transfer in walls: Impacts on the thermal performance of buildings. Architectural Engineering and Design Management, 18(4), pp. 453-472. ISSN 1745-2007

Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking. PhD thesis, Luleå University of Technology, Sweden.

Torfi, F and Rashidi, A (2011) Selection of project managers in construction firms using analytic hierarchy process and fuzzy TOPSIS: A case study. Journal of Construction in Developing Countries, 16(1), pp. 69-89. ISSN 1823-6499

Torriti, J (2012) Multiple-project discount rates for cost-benefit analysis in construction projects: A formal risk model for microgeneration renewable energy technologies. Construction Management and Economics, 30(9), pp. 739-747. ISSN 1466433X

Touran, A (2003) Probabilistic model for cost contingency. Journal of Construction Engineering and Management, 129(3), pp. 280-284. ISSN 0733-9364

Touran, A and Ladick, D R (1989) Application of robotics in bridge deck fabrication. Journal of Construction Engineering and Management, 115(1), pp. 35-52. ISSN 0733-9364

Tran, H; Robert, D; Gunarathna, P and Setunge, S (2023) Stochastic prediction of road network degradation based on field monitoring data. Journal of Construction Engineering and Management, 149(10): 04023096, ISSN 0733-9364

Trinius, W (1999) Environmental assessment in building and construction goals and scope definition as key to methodology choices. DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.

Troje, D (2020) Constructing social procurement: An institutional perspective on working with employment requirements. PhD thesis, Chalmers University of Technology, Sweden.

Truong-Hong, L; Lindenbergh, R and Nguyen, T A (2022) Structural assessment using terrestrial laser scanning point clouds. International Journal of Building Pathology and Adaptation, 40(3), pp. 345-379. ISSN 23984708

Tseng, C-H (2006) Safety performance analyzer for constructed environments (SPACE). PhD thesis, Ohio State University, USA.

Tserng, H P; Yin, S Y L and Li, S (2006) Developing a resource supply chain planning system for construction projects. Journal of Construction Engineering and Management, 132(4), pp. 393-407. ISSN 0733-9364

Turner, D (2017) Variations of the project sponsor role and benefits realisation: A phenomenographic study. PhD thesis, Sheffield Hallam University, UK.

Turner, J P (1992) Constructability for drilled shafts. Journal of Construction Engineering and Management, 118(1), pp. 77-93. ISSN 0733-9364

Tutesigensi, A and Parcell, K (2007) Benefits of mobile telephones for construction contractors in the United Kingdom. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Twyford, J W (2007) Additional payments under construction contracts. Construction Management and Economics, 25(7), pp. 739-745. ISSN 1466433X

Uddin, M; Mahboub, K C and Goodrum, P M (2011) Effects of nonnormal distributions on highway construction acceptance pay factor calculation. Journal of Construction Engineering and Management, 137(2), pp. 108-118. ISSN 0733-9364

Uddin, M M (2011) Robust statistical methods for non-normal quality assurance data analysis in transportation projects. PhD thesis, University of Kentucky, USA.

Uduwage Don, N L S; Panuwatwanich, K and Waidyasekara, K G A S (2025) Multicriteria selection practices in public tender evaluation process: The case of Sri Lanka. Built Environment Project and Asset Management, 15(3), pp. 733-751. ISSN 2044-124X

Uhanovita A.C, N; K.A.T.O, R and Parameswaran, A (2025) Poka-yoke to minimise variations: A framework for building projects. Construction Innovation, 25(3), pp. 972-993. ISSN 1471-4175

Ujene, A O and Edike, U E (2015) Relationships among internal stakeholders in construction projects: A cognitive evaluation for sustainable team integration in Nigeria. International Journal of Construction Management, 15(1), pp. 71-81. ISSN 1562-3599

Underwood, J; Alshawi, M A; Aouad, G; Child, T and Faraj, I Z (2000) Enhancing building product libraries to enable the dynamic definition of design element specifications. Engineering, Construction and Architectural Management, 7(4), pp. 373-388. ISSN 0969-9988

V E, S; Shin, C and Cho, Y (2021) Efficient energy consumption prediction model for a data analytic-enabled industry building in a smart city. Building Research & Information, 49(1), pp. 127-143. ISSN 0961-3218

Vacanas, Y and Danezis, C (2021) An overview of the risk of delay in Cyprus construction industry. International Journal of Construction Management, 21(4), pp. 369-381. ISSN 1562-3599

Valkonen, T; Lindberg, A; Alhava, O; Talebi, S; Koskela, L and Seppänen, O (2026) Tolerance management in prefabrication of mechanical, electrical, and plumbing installations. Construction Management and Economics, 44(4), pp. 279-299. ISSN 0144-6193

Van Der Heijden, J (2009) International comparative analysis of building regulations: An analytical tool. International Journal of Law in the Built Environment, 1(1), pp. 9-25. ISSN 1756-1450

Van Der Meulen, G J R and Money, A H (1984) The bidding game. Journal of Construction Engineering and Management, 110(2), pp. 153-164. ISSN 0733-9364

Van Zyl, I J (1986) The role of standardization in the building industry. DSc thesis, University of Pretoria, South Africa.

Vargas, G; Lawrence, R and Stevenson, F (2017) The role of lobbies: Short-term thermal transitions. Building Research & Information, 45(7), pp. 759-782. ISSN 0961-3218

Vasserman, S (2019) Essays on industrial organization. PhD thesis, Harvard University, USA.

Venugopal, M (2011) Formal specification of industry foundation class concepts using engineering ontologies. PhD thesis, Georgia Institute of Technology, USA.

Veselka, J (2023) BIM data structure in the building optimization: Methodology for model development. PhD thesis, Czech Technical University, Czech Republic.

Victoria, M F; Perera, S; Davies, A and Fernando, N (2017) Carbon and cost critical elements: A comparative analysis of two office buildings. Built Environment Project and Asset Management, 7(5), pp. 460-470. ISSN 2044-124X

Vidalakis, C; Abanda, F H and Oti, A H (2020) BIM adoption and implementation: focusing on SMEs. Construction Innovation, 20(1), pp. 128-147. ISSN 1471-4175

Vidalakis, C and Sommerville, J (2013) Transportation responsiveness and efficiency within the building supply chain. Building Research & Information, 41(4), pp. 469-481. ISSN 0961-3218

Vidalis, S M (2005) Relation between cost, quality, and risk in portland cement concrete pavement construction. PhD thesis, University of Florida, USA.

Vidanapathirana, M; Perera, N; Emmanuel, R and Coorey, S (2025) High-rise building density optimization for air quality improvement and investment potential. Built Environment Project and Asset Management, 15(3), pp. 467-482. ISSN 2044-124X

Vidogah, W (1997) Claims on construction contracts: a new management framework. PhD thesis, University of Wolverhampton, UK.

Viking, A and Stehn, L (2015) Exploring Swedish local planning authorities'perceptions of standardized housing construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Vinodh, S and Ravikumar, R (2012) Application of probabilistic finite element analysis for crane hook design. Journal of Engineering, Design and Technology, 10(2), pp. 255-275. ISSN 1726-0531

Volker, L; Eriksson, P E; Kadefors, A and Larsson, J (2018) A case-based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Votto, R; Lee Ho, L and Berssaneti, F (2020) Applying and assessing performance of earned duration management control charts for EPC project duration monitoring. Journal of Construction Engineering and Management, 146(3): 04020001, ISSN 0733-9364

Wachira, N; Root, D; Bowen, P and Olima, W (2008) Changing craft skills in the Kenyan construction sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Wacker, J G (1975) An econometric investigation into scale returns in the contract construction industry accounting for regional variations. PhD thesis, Wayne State University, USA.

Wagle, S; Gopalakrishnan, B; Li, H; Liu, Z; Chaudhari, S and Sundaramoorthy, S (2024) Simulating energy performance of buildings: a study using eQUEST and Energy Star® portfolio manager. Architectural Engineering and Design Management, 20(5), pp. 997-1018. ISSN 1745-2007

Waldman, B; Huang, M and Simonen, K (2020) Embodied carbon in construction materials: A framework for quantifying data quality in epds. Buildings & Cities, 1(1), pp. 625-636. ISSN 2632-6655

Walker, D H T and Vines, M W (1997) Construction time performance in multi-unit residential construction: Insight into the role of procurement methods. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Wallace, W A (1987) Capital costs versus costs-in-use: A content analysis of design team member communication patterns. Construction Management and Economics, 5(4), ISSN 01446193

Wallace, W A (1987) The influence of design team communication content upon the architectural decision making process in the pre-contract design stages. PhD thesis, Heriot-Watt University, UK.

Walsh, K D; Houston, W N and Houston, S L (1997) Field implications of current compaction specification design practices. Journal of Construction Engineering and Management, 123(4), pp. 363-370. ISSN 0733-9364

Wambeke, B W (2011) Identifying, prioritizing, and reducing variation of construction related tasks. PhD thesis, North Carolina State University, USA.

Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364

Wambeke, B W; Liu, M and Hsiang, S M (2012) Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks. Journal of Construction Engineering and Management, 138(4), pp. 491-498. ISSN 0733-9364

Wan, S K M; Kumaraswamy, M M and Liu, D T C (2009) Contributors to construction debris from electrical and mechanical work in Hong Kong infrastructure projects. Journal of Construction Engineering and Management, 135(7), pp. 637-646. ISSN 0733-9364

Wang, L; Huang, R and Li, X (2025) Research on technical suitability analysis and scheme selection of prefabricated buildings in China. Engineering, Construction and Architectural Management, 32(8), pp. 4969-4990. ISSN 0969-9988

Wang, C; Liu, M; Hsiang, S M and Leming, M L (2012) Causes and penalties of variation: Case study of a precast concrete slab production facility. Journal of Construction Engineering and Management, 138(6), pp. 775-785. ISSN 0733-9364

Wang, C H and Mei, Y H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(2), pp. 147-157. ISSN 01446193

Wang, D Y and Wang, X (2025) Can reputation system complement limited inspection accuracy in deterring opportunistic claims? Engineering, Construction and Architectural Management, 32(3), pp. 1435-1456. ISSN 0969-9988

Wang, H-H (2010) A context-based representation and reasoning formalism to support construction safety planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Wang, J (2022) BIM and construction dispute management. PhD thesis, University of Manchester, UK.

Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), pp. 47-63. ISSN 1557-8771

Wang, J; Han, J; Chen, J; Ding, G; Feng, G; Liu, T and Guo, B (2022) Experimental and numerical study on the dynamic response of a superthick backfill subgrade under high-speed railway loading: A case study of qianjiang-zhangjiajie-changde railway. Journal of Construction Engineering and Management, 148(12): 05022014, ISSN 0733-9364

Wang, J; Zhang, S; Fenn, P; Luo, X; Liu, Y and Zhao, L (2023) Adopting BIM to facilitate dispute management in the construction industry: A conceptual framework development. Journal of Construction Engineering and Management, 149(1): 03122010, ISSN 0733-9364

Wang, N (2022) Spoken dialogue system for information extraction from building information models using artificial intelligence. PhD thesis, University of Florida, USA.

Wang, N and Horner, R M W (2007) Fuzzy rule based system approach to assess cleaning costs of carpet flooring. Journal of Financial Management of Property and Construction, 12(1), pp. 25-36. ISSN 1366-4387

Wang, P; Wang, K; Huang, Y and Fenn, P (2025) Probability, formation, and prediction of large-size construction cost overruns governed by a power-law distribution. Journal of Construction Engineering and Management, 151(6): 04025062, ISSN 0733-9364

Wang, S (2019) An exact architectural practice: Strategies for post-digital architectural design in China’s construction context. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Wang, S; Park, S; Kim, J and Kim, J (2025) Safety helmet monitoring on construction sites using yolov10 and advanced transformer architectures with surveillance and body-worn cameras. Journal of Construction Engineering and Management, 151(11): 04025186, ISSN 0733-9364

Wang, T K; Ford, D N; Chong, H Y and Zhang, W (2018) Causes of delays in the construction phase of Chinese building projects. Engineering, Construction and Architectural Management, 25(11), pp. 1534-1551. ISSN 0969-9988

Wang, W; Guo, J; Tian, Q; Peng, Y; Yu, B and Cao, Z (2024) Layout optimization for stormwater harvesting facilities in coal ports considering stochasticity of underlying surface types. Journal of Construction Engineering and Management, 150(10): 04024132, ISSN 0733-9364

Wang, W; Zhang, S and Pasquire, C (2018) Factors for the adoption of green building specifications in China. International Journal of Building Pathology and Adaptation, 36(3), pp. 254-267. ISSN 23984708

Wang, X; Chen, Y; Liu, B; Shen, Y and Sun, H (2013) A total factor productivity measure for the construction industry and analysis of its spatial difference: A case study in China. Construction Management and Economics, 31(10), pp. 1059-1071. ISSN 1466433X

Wang, Y (1998) An analysis of the technical efficiency in Hong Kong's construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Wang, Y (2024) Towards automated contract analysis: Applying language models to risk identification in the context of public-private partnerships. PhD thesis, University of Maryland, College Park, USA.

Wang, Y; Lin, M; Xu, K; Zhang, S and Ma, H (2021) Energy consumption analysis of glass house using electrochromic window in the subtropical region. Journal of Engineering, Design and Technology, 19(1), pp. 203-218. ISSN 1726-0531

Wang, Y; Zhu, S and Wong, A S T (2014) Cooling time estimation of newly placed hot-mix asphalt pavement in different weather conditions. Journal of Construction Engineering and Management, 140(5): 04014009, ISSN 0733-9364

Wang, Y S and Chau, K W (1997) An evaluation of the efficiency of construction industry in Hong Kong using the DEA approach. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Wang, Z; Hu, H and Gong, J (2018) Modeling worker competence to advance precast production scheduling optimization. Journal of Construction Engineering and Management, 144(11): 04018098, ISSN 0733-9364

Wanigarathna, N (2014) Evidence-based design for healthcare buildings in England and wales. PhD thesis, Loughborough University, UK.

Wanigarathna, N; Sherratt, F; Price, A and Austin, S (2016) Healthcare designers' use of prescriptive and performance-based approaches. Architectural Engineering and Design Management, 12(6), pp. 427-441. ISSN 1745-2007

Ward, B (2015) Integrated asset management systems for water infrastructure. EngD thesis, University of Exeter, UK.

Warrier, G A and Palaniappan, S (2025) Uncertainty in the embodied energy assessment of buildings: a case of EWS type low-cost house in India. International Journal of Construction Management, 25(8), pp. 911-922. ISSN 1562-3599

Warszawski, A (1983) Planning and organization of research in building. Journal of Construction Engineering and Management, 109(3), pp. 261-275. ISSN 0733-9364

Waskett, P R (1999) Management of the building design process with the analytical design planning technique. PhD thesis, Loughborough University, UK.

Watson, M (2007) Concerns for skills shortages in the 21st century: A review into the construction industry, Australia. Construction Economics and Building, 7(1), pp. 45-54. ISSN 2204-9029

Watson, R; Lockley, S R and Shaaban, S (2002) Creating usable models for re-usable data: Managing electronic project specification information. Engineering, Construction and Architectural Management, 9(3), pp. 272-283. ISSN 0969-9988

Watts, C J (2002) In-service training for computer-aided design in building surveying. PhD thesis, De Montfort University, UK.

Wedding, G C (2008) Understanding sustainability in real estate: A focus on measuring and communicating success in green building. PhD thesis, University of North Carolina at Chapel Hill, USA.

Wei, H and Xu, X (1997) Composite masonry buildings in China. Building Research & Information, 25(1), pp. 15-17. ISSN 0961-3218

Wei, L; Liu, G; Liu, W; Li, W and Yuan, Y (2023) Airborne infection risk in classrooms based on environment and occupant behavior measurement under COVID-19 epidemic. Building Research & Information, 51(6), pp. 701-716. ISSN 0961-3218

Weiss, T (2021) Energy flexibility and shiftable heating power of building components and technologies. Smart and Sustainable Built Environment, 10(4), pp. 740-758. ISSN 2046-6099

Weitkamp, T K B (2024) Uncharted territory: Mapping diverse and dispersed smallholder irrigation in Sub-Saharan Africa through remote sensing. PhD thesis, Wageningen University and Research, Netherlands.

Wentzel, L; Wentzel, T and Emuze, F A (2014) The construction SMEs development debate in South Africa: Contributions from fet colleges. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Wetherington, L E (1992) The effect of variations in management techniques on construction productivity. PhD thesis, University of Florida, USA.

Wetzel, E M (2016) The use of a BIM-based framework to support safe facility management processes. PhD thesis, Virginia Tech, USA.

Whaley, A (2020) Conflict and claims culture in construction. PhD thesis, University of Salford, UK.

Whang, S W; Flanagan, R and Kim, K P (2025) An analysis of the optimal research and development investment level of contractor using the panel threshold regression model. International Journal of Construction Management, 25(16), pp. 2007-2019. ISSN 1562-3599

Wheat, P E (2013) Econometric cost analysis in vertically separated railways. PhD thesis, University of Leeds, UK.

White, A (2020) Operational performance and delivery structure of hospital facilities: empirical relationship analyses in Ontario, Canada. DBA thesis, University of Manchester, UK.

White, G and Jamshidi, A (2022) Resetting dense graded airport asphalt production and construction tolerances. International Journal of Construction Management, 22(4), pp. 632-643. ISSN 1562-3599

Whittaker, J D (1970) A study of competitive bidding with particular reference to the construction industry. PhD thesis, City, University of London, UK.

Whyte, A and Cammarano, C (2012) Value management in infrastructure projects in western Australia: Techniques and staging. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Wibowo, A (2024) Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects. Built Environment Project and Asset Management, 14(2), pp. 228-243. ISSN 2044-124X

Wibowo, A and Hartiati, D (2023) Value-for-money drivers in public-private partnerships in affordable housing in Indonesia: An analytic network process perspective. Journal of Construction in Developing Countries, 28(2), pp. 101-119. ISSN 1823-6499

Wickramasinghe, V; Dias, P; Robert, D and Setunge, S (2024) From physical degradation condition ratings of building elements to lost value ratio bands. Built Environment Project and Asset Management, 14(6), pp. 858-873. ISSN 2044-124X

Wijetunge, J J (2020) A multi-scenario assessment of the seismogenic tsunami hazard for Bangladesh. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 156-168. ISSN 1759-5916

Wild, S; Gailius, A; Hansen, H; Pederson, L and Szwabowski, J (1997) Pozzolanic properties of a variety of European clay bricks. Building Research & Information, 25(3), pp. 170-175. ISSN 0961-3218

Wilkinson, R W (1984) Computerized specifications on a small project. Journal of Construction Engineering and Management, 110(3), pp. 337-345. ISSN 0733-9364

Williams, T P (1991) Hypertext data base applications in construction. Journal of Construction Engineering and Management, 117(3), pp. 460-467. ISSN 0733-9364

Wilson, I E (2003) Digitally enabling the construction virtual enterprise. PhD thesis, University of Salford, UK.

Windapo, A; Adediran, A and Olugboyega, O (2019) Procurement strategies influencing small and medium contractor development in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 253-263. ISSN 17514304

Windapo, A and Moghayedi, A (2018) Building material price differentiation across geographic locations in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 243-254. ISSN 17514304

Wing, C K (1999) On the issue of plan shape complexity: Plan shape indices revisited. Construction Management and Economics, 17(4), pp. 473-482. ISSN 01446193

Winter, M and Norman, T (2011) OHSAS 18001 in a UK county highways and transportation department. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 49-54. ISSN 17514312

Wirahadikusumah, R; Abduh, M; Messah, Y and Aulia, M (2021) Introducing sustainability principles into the procurement of construction works–case of Indonesian developers. International Journal of Construction Management, 21(9), pp. 932-944. ISSN 1562-3599

Woksepp, S (2007) Virtual reality in construction tools, methods and processes. PhD thesis, Luleå University of Technology, Sweden.

Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.

Wong, E T T; Norman, G and Flanagan, R (2000) A fuzzy stochastic technique for project selection. Construction Management and Economics, 18(4), pp. 407-414. ISSN 01446193

Wong, K C and Albert, T P S (1995) A fuzzy expert system for contract decision making. Construction Management and Economics, 13(2), pp. 95-103. ISSN 01446193

Wong, K C; So, A T P and Yu, N H W (2001) The financial viablity of intelligent buildings: A Faustmann approach of assessment. Journal of Financial Management of Property and Construction, 6(1), pp. 41-50. ISSN 1366-4387

Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.

Wood, G; Davis, P and Olaleye, A (2011) The effects of adding real estate into mixed-asset portfolios in South Africa. Journal of Financial Management of Property and Construction, 16(3), pp. 272-282. ISSN 1366-4387

Wood, H L; Piroozfar, P A E and Farr, E R P (2014) Moving beyond project complexity: Exploring empirical dimensions of complexity in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Woolery, J C (1994) Developing specifications for cellular-telephone base stations. Journal of Construction Engineering and Management, 120(3), pp. 593-602. ISSN 0733-9364

Wright, C E (1980) The energy requirements of residential developments. PhD thesis, University of Surrey, UK.

Wu, D.; Wang, T.; Chan, P. and Gruis, V. (2026) Integration of circular economy principles into Dutch social housing procurement: Technological, organizational and environmental practices, challenges and development potentials. Smart and Sustainable Built Environment, pp. 1-21. ISSN 2046-6099

Wu, C H; Hsieh, T Y; Cheng, W L and Lu, S T (2004) Grey relation analysis of causes for change orders in highway construction. Construction Management and Economics, 22(5), pp. 509-520. ISSN 01446193

Wu, R (2002) Computer -aided dimensional control in building construction. PhD thesis, Eindhoven University of Technology, Netherlands.

Wu, X; Tian, Z; Tian, C; Wang, Y and Li, J (2019) New design-day method for building cooling load calculation in China. Building Research & Information, 47(8), pp. 901-911. ISSN 0961-3218

Wu, X and Xu, F (2021) Detection model for unbalanced bidding in railway construction projects: Considering the risk of quantity variation. Journal of Construction Engineering and Management, 147(7): 04021055, ISSN 0733-9364

Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333. ISSN 0969-9988

Wuni, I Y; Shen, G Q and Antwi-Afari, M F (2023) Exploring the design risk factors for modular integrated construction projects. Construction Innovation, 23(1), pp. 213-228. ISSN 1471-4175

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387

Wuni, I Y; Shen, G Q and Osei-Kyei, R (2022) Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects. International Journal of Construction Management, 22(11), pp. 2108-2120. ISSN 1562-3599

Wågø, S and Berker, T (2014) Architecture as a strategy for reduced energy consumption? An in-depth analysis of residential practices' influence on the energy performance of passive houses. Smart and Sustainable Built Environment, 3(3), pp. 192-206. ISSN 2046-6099

Xenidis, Y and Angelides, D (2005) Identification and classification of risks in a new modelling process for build-operate-transfer projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Xia, B; Chan, A P C and Yeung, J F Y (2011) Developing a fuzzy multicriteria decision-making model for selecting design-build operational variations. Journal of Construction Engineering and Management, 137(12), pp. 1176-1184. ISSN 0733-9364

Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029

Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 0969-9988

Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.

Xie, H; Hong, Y and Brilakis, I (2022) Analysis of user needs in time-related risk management for holistic project understanding. Journal of Construction Engineering and Management, 148(4): 05022002, ISSN 0733-9364

Xu, J; Jin, R; Piroozfar, P; Wang, Y; Kang, B G; Ma, L; Wanatowski, D and Yang, T (2018) Constructing a BIM climate-based framework: Regional case study in China. Journal of Construction Engineering and Management, 144(11): 04018105, ISSN 0733-9364

Xu, Ming (2010) The value of critical project decisions: measurement and modelling. PhD thesis, University of Melbourne, Australia.

Xu, N; Liang, Y; Guo, C; Meng, B; Zhou, X; Hu, Y and Zhang, B (2025) Entity recognition in the field of coal mine construction safety based on a pre-training language model. Engineering, Construction and Architectural Management, 32(4), pp. 2590-2613. ISSN 0969-9988

Xue, X; Shen, Q; Wang, Y and Lu, J (2008) Measuring the productivity of the construction industry in China by using DEA-based malmquist productivity indices. Journal of Construction Engineering and Management, 134(1), pp. 64-71. ISSN 0733-9364

Xundi, D; Liyin, S; Saixing, Z; Jorge, O J and Xiaoling, Z (2010) Relationship between energy consumption and economic development in construction industry. Journal of Engineering, Design and Technology, 8(3), pp. 257-273. ISSN 1726-0531

Yakın, Ö and Güncü, A. (2026) Post-disaster housing recovery models in Turkey: A case study of the 2020 İzmir seferihisar earthquake. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 239-257. ISSN 1759-5908

Yan, X and Kim, Y C (2018) A conceptual framework of ITSMCA for a building collapse accident. Engineering, Construction and Architectural Management, 25(6), pp. 721-737. ISSN 0969-9988

Yang, C (2023) Reliability-based methodology for design and evaluation of concrete bridge decks. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.

Yang, I T (2005) Chance-constrained time-cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), pp. 1002-1012. ISSN 0733-9364

Yang, X; Wang, S; Jiang, Y; Wang, L; Li, P and Wang, S (2025) Theoretical and experimental analysis of stress variations in precast concrete segment linings during double-shield TBM excavation of subway tunnels. Journal of Construction Engineering and Management, 151(6): 04025040, ISSN 0733-9364

Yap, J. B. H.; Tan, Z. Y.; Skitmore, M.; Loo, S. C. and Yong, F. Y. Y. (2026) Unmasking green procurement: What drives adoption in developing-country construction? Construction Management and Economics, 44(5), pp. 337-358. ISSN 0144-6193

Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531

Yap, J B H and Skitmore, M (2018) Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), pp. 218-238. ISSN 1745-2007

Yatim, Y M (2009) Fire safety models for high-rise residential buildings in Malaysia. PhD thesis, Heriot-Watt University, UK.

Yazdani Mehr, S and Wilkinson, S (2020) The importance of place and authenticity in adaptive reuse of heritage buildings. International Journal of Building Pathology and Adaptation, 38(5), pp. 689-701. ISSN 23984708

Ye, Y X; Shan, M; Gao, X; Li, Q and Zhang, H (2024) Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques. International Journal of Construction Management, 24(15), pp. 1617-1629. ISSN 1562-3599

Yemoh, O O; Opoku, R; Takyi, G; Adomako, E K; Uba, F and Obeng, G (2025) Green building adaptation in hot-humid climates: Assessment of coconut and corn husk fiber composite bricks as energy-efficient building envelopes. International Journal of Building Pathology and Adaptation, 43(6), pp. 1522-1540. ISSN 2398-4708

Yin, Chin Nyuk (1981) The doctrine of fundamental breach in contract law. PhD thesis, Australian National University, Australia.

Yizhe, T and Youjie, L (1992) Unbalanced bidding on contracts with. Variation trends in client-provided quantities. Construction Management and Economics, 10(1), pp. 69-80. ISSN 01446193

Yogeswaran, K (1998) Sources, causes and minimisation of contractual claims in civil engineering projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Yogeswaran, K; Kumaraswamy, M M and Miller, D R A (1997) Perceived sources and causes of construction claims. Journal of Construction Procurement, 3(3), pp. 3-26. ISSN 1358-9180

Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.

Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.

Yousefi, E; Ahmadian Fard Fini, A and Loganathan, S (2025) Production-oriented approach for optimal mass-customisation of floor panel layouts in cross-laminated timber (CLT) buildings. Engineering, Construction and Architectural Management, 32(9), pp. 5965-5988. ISSN 0969-9988

Yu, B (2007) Essays on structural analysis of procurement auctions. PhD thesis, Ohio State University, USA.

Yu, X and Ergan, S (2021) Key variables in determining energy shaving capacity of buildings during demand response events. Journal of Construction Engineering and Management, 147(1): 04020146, ISSN 0733-9364

Yuan, F; Tang, M and Hong, J (2020) Efficiency estimation and reduction potential of the Chinese construction industry via SE-DEA and artificial neural network. Engineering, Construction and Architectural Management, 27(7), pp. 1533-1552. ISSN 0969-9988

Yuan, L L (1998) Analysing operating costs of town councils. Journal of Financial Management of Property and Construction, 3(1), pp. 83-92. ISSN 1366-4387

Yuan, W; Yang, R; Yu, J; Zeng, Q and Yao, Z (2023) Control method of spray curing system for cement concrete members based on the adaboost.M1 algorithm. Construction Innovation, 23(1), pp. 178-192. ISSN 1471-4175

Yuan, Z; Fang, Y; Hong, J; Zhang, Q; Zhang, Z and Ni, G (2022) Coupling relationship between capabilities and benefits of lean construction for precast buildings from a multivariable moderation perspective. Journal of Construction Engineering and Management, 148(5): 04022011, ISSN 0733-9364

Yue, H; Ye, G; Cao, H; Liu, Q; Xiang, Q and Luo, Y (2024) Exploring the internal influence mechanism of group safety behavior of construction workers: Qualitative method approach. Journal of Construction Engineering and Management, 150(11): 04024163, ISSN 0733-9364

Yun Zhen, G W; Wai Wah, L; Sui Pheng, L and Shi Yee, W (2026) Application of building information modelling (BIM) technology in risk management of high-rise building (hrb) projects in Malaysia. International Journal of Construction Management, 26(2), pp. 332-348. ISSN 1562-3599

Yung, P and Agyekum-Mensah, G (2012) Productivity losses in smoking breaks on construction sites: A case study. Engineering, Construction and Architectural Management, 19(6), pp. 636-646. ISSN 0969-9988

Yıldırım, A; Genç, O and Aydınlı, S (2026) An examination of the perceptions of occupational work ethics among construction professionals working in the public and private sectors: A factor analysis (fa) and hypothesis testing approach. International Journal of Construction Management, 26(4), pp. 604-620. ISSN 1562-3599

Zabihi Kolaei, A; Khanzadi, M and Ghodrati Amiri, G (2026) Integration of augmented reality and blockchain technologies for visualizing and documenting change orders in a building project: Case study. Journal of Construction Engineering and Management, 152(2): 04025251, ISSN 0733-9364

Zaghloul, R S (2005) Risk allocation in contracts: How to improve the process. PhD thesis, University of Calgary, Canada.

Zahoor, H; Chan, A P C; Masood, R; Choudhry, R M; Javed, A A and Utama, W P (2016) Occupational safety and health performance in the Pakistani construction industry: Stakeholders' perspective. International Journal of Construction Management, 16(3), pp. 209-219. ISSN 1562-3599

Zakeri, M (1996) An evaluation of productivity and management practice in the Iranian construction industry. PhD thesis, University of Wolverhampton, UK.

Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.

Zaneldin, E K (2020) Investigating the types, causes and severity of claims in construction projects in the UAE. International Journal of Construction Management, 20(5), pp. 385-401. ISSN 1562-3599

Zarghami, S A (2024) Measuring sensitivity to change orders in construction projects using eigenvector centrality and radius of gyration. Engineering, Construction and Architectural Management, 31(6), pp. 2478-2495. ISSN 0969-9988

Zarkada, A (1998) Tendering ethics: A study of collusive tendering from a marketing perspective. PhD thesis, Queensland University of Technology, Australia.

Zeb, J and Froese, T (2014) Infrastructure management transaction formalism protocol specification: A process development model. Construction Innovation, 14(1), pp. 69-87. ISSN 1471-4175

Zerihun, A; Beza, D and Idrisi, M J (2025) Factors affecting contractor and subcontractor relationship and their effects on building project performance: Case of Addis Ababa. International Journal of Construction Management, 25(14), pp. 1716-1724. ISSN 1562-3599

Zhai, Y (2022) Evaluation for optimisation: Design for assembly in panel construction. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Zhang, S.; Zhong, B.; Sepasgozar, S. M. E.; Xia, Z.; Zhong, X. and Guan, Q. (2026) Toward a federated cross-organizational construction safety knowledge recommendation: A dual-incentive mechanism integrating worker satisfaction. Journal of Construction Engineering and Management, 152(10): 04026159, ISSN 0733-9364

Zhang, Guomin (2005) Factors influencing the implementation of raised floor system for the fitout of office buildings in the Australian context. PhD thesis, Queensland University of Technology, Australia.

Zhang, J; Wang, T and Zhang, L (2021) Legal risk assessment framework for international PPP projects based on metanetwork. Journal of Construction Engineering and Management, 147(8): 04021090, ISSN 0733-9364

Zhang, K; Cui, Q and DeCorla-Souza, P (2025) Performance and efficiency diffusion of us surface transportation public-private partnerships. Journal of Construction Engineering and Management, 151(1): 04024192, ISSN 0733-9364

Zhang, L; Hu, H; Fang, Y; Qiang, Z and Cai, Y (2023) Preliminary CSI specification localization methodology matrix in China. International Journal of Construction Management, 23(6), pp. 935-944. ISSN 1562-3599

Zhang, M; Cheng, W and Wang, Y (2018) Multiple-fault classification for hot-mix asphalt production by machine learning. Journal of Construction Engineering and Management, 144(5): 04018024, ISSN 0733-9364

Zhang, N; Hwang, B G; Deng, X and Tay, F (2020) Collaborative contracting in the Singapore construction industry: Current status, major barriers and best solutions. Engineering, Construction and Architectural Management, 27(10), pp. 3115-3133. ISSN 0969-9988

Zhang, X (2018) Sustainable retrofitting of existing residential buildings at community scale in China. PhD thesis, Cardiff University, UK.

Zhang, Xutong (2025) Physics-guided machine learning for condition assessment of building structures in operational environments. PhD thesis, University of Technology Sydney, Australia.

Zhang, Y; Zhang, M; Gao, F and Li, J (2025) Inverse problem method application in building physics numerical optimization: New insight into ideal envelope properties determination. Architectural Engineering and Design Management, 21(2), pp. 252-267. ISSN 1745-2007

Zhang, Y; Wang, W; Mi, L; Sun, G; Qiao, L; Tao, M and Wang, L (2025) Uncovering the organizational vulnerability toward construction project accidents: Bertopic-based text mining analysis. Journal of Construction Engineering and Management, 151(11): 04025179, ISSN 0733-9364

Zhao, F.; Shi, S. and Fu, X. (2026) Research on decision-making of project financing models based on tri-reference point theory: Evidence from public-private partnerships (PPPs) in China. Engineering, Construction and Architectural Management, 27(5), pp. 1-28. ISSN 0969-9988

Zhao, S; Lu, T F; Statsenko, L; Koch, B and Garcia, C (2022) A framework for near real-time rom stockpile modelling to improve blending efficiency. Journal of Engineering, Design and Technology, 20(2), pp. 497-515. ISSN 1726-0531

Zhao, Y (2016) Green supply chain management drivers/pressures, practices and performance in Chinese construction industry. PhD thesis, Anglia Ruskin University, UK.

Zhao, Y (2023) Sustainability, acceptance risk analysis and machine learning in assessing mechanical properties and the impact of highway materials in transportation infrastructure. PhD thesis, University of Maryland, College Park, USA.

Zhong, B; Li, H; Luo, H; Zhou, J; Fang, W and Xing, X (2020) Ontology-based semantic modeling of knowledge in construction: Classification and identification of hazards implied in images. Journal of Construction Engineering and Management, 146(4): 04020013, ISSN 0733-9364

Zhou, X; Wang, Y and Gong, E (2025) Investigation of the factors driving engineering insurance consumption in china’s construction industry: A hybrid approach. Engineering, Construction and Architectural Management, 32(5), pp. 3236-3258. ISSN 0969-9988

Zhu, Q; Zhou, T; Xia, P and Du, J (2022) Robot planning for active collision avoidance in modular construction: Pipe skids example. Journal of Construction Engineering and Management, 148(10): 04022114, ISSN 0733-9364

Zhu, Y (1999) Web-based construction document processing through a "malleable frame". PhD thesis, University of Florida, USA.

Zou, Y (2017) BIM and knowledge based risk management system. PhD thesis, University of Liverpool, UK.

Zou, Y (2017) Building information modelling and knowledge-based risk management system. PhD thesis, University of Liverpool, UK.

Zou, Y; Kiviniemi, A and Jones, S W (2016) Developing a tailored rbs linking to BIM for risk management of bridge projects. Engineering, Construction and Architectural Management, 23(6), pp. 727-750. ISSN 0969-9988

Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.

de Leon, D E (1996) Integrating socioeconomics in the development of criteria for optimal aseismic design of r/c buildings. PhD thesis, University of California, Irvine, USA.

ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175

van Marken Lichtenbelt, W; Hanssen, M; Pallubinsky, H; Kingma, B and Schellen, L (2017) Healthy excursions outside the thermal comfort zone. Building Research & Information, 45(7), pp. 819-827. ISSN 0961-3218

van Tonder, F and Rwelamila, P D (2024) A comparison of low-cost housing units for varying climatic regions in South Africa: A knowledge management approach. Smart and Sustainable Built Environment, 13(5), pp. 1310-1329. ISSN 2046-6099

van Uden, M; Wamelink, H; van Bueren, E and Heurkens, E (2025) Aligning practices towards a circular economy in the architecture, engineering, and construction sector: Seven transitions in different stages of reconfiguration. Construction Management and Economics, 43(2), pp. 153-174. ISSN 0144-6193

van der Meer, Jeroen (2021) Raising risk awareness in infrastructure tenders. PhD thesis, University of Twente, Netherlands.

Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364

Özer, S and Jacoby, S (2024) Space standards in affordable housing in England. Building Research & Information, 52(6), pp. 611-626. ISSN 0961-3218

This list was generated on Sat Aug 22 02:35:54 2026 UTC.