Items with Subject: contract type
Abbas, N M A (1998) The impact of construction contract models on construction claims in Saudi Arabia. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Abd Jamil, A H and Fathi, M S (2018) Contractual challenges for BIM-based construction projects: A systematic review. Built Environment Project and Asset Management, 8(4), pp. 372-385. ISSN 2044-124X
Abdul Ghani, N and Tutesigensi, A (2023) Managing change in megaprojects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Abdullah, A H; Yaman, S K; Mohammad, H and Hassan, P F (2018) Construction manager's technical competencies in Malaysian construction projects. Engineering, Construction and Architectural Management, 25(2), pp. 153-177. ISSN 0969-9988
Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.
Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.
Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364
Acheamfour, V K; Kissi, E; Adjei-Kumi, T and Adinyira, E (2020) Review of empirical arguments on contractor pre-qualification criteria. Journal of Engineering, Design and Technology, 18(1), pp. 70-83. ISSN 1726-0531
Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: An investigation. Construction Management and Economics, 24(1), pp. 81-96. ISSN 01446193
Aderibigbe, A; Umeokafor, N and Umar, T (2023) Constructing for the future: Can the duty of good faith improve payment in the UK construction industry? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Agyekum, K; Adinyira, E and Amudjie, J (2021) Ethical misconducts within the invitation to tender and tender evaluation and award stages of construction contracts in Ghana. Journal of Engineering, Design and Technology, 19(5), pp. 1101-1123. ISSN 1726-0531
Akintoye, A; Bowen, P and Hardcastle, C (1998) Macro-economic leading indicators of construction contract prices. Construction Management and Economics, 16(2), pp. 159-175. ISSN 01446193
Al Qady, M and Kandil, A (2010) Concept relation extraction from construction documents using natural language processing. Journal of Construction Engineering and Management, 136(3), pp. 294-302. ISSN 0733-9364
Al Rashdi, A (2012) A strategic framework for the further enhancement of the standard forms of construction contract in the Sultanate of Oman. PhD thesis, University of Salford, UK.
Al-Mhdawi, M K S (2022) Risk management of construction projects under extreme conditions: a case study of Iraq. PhD thesis, University of Southampton, UK.
Al-Mhdawi, M K S; Brito, M; Onggo, B S; Qazi, A and O'Connor, A (2024) COVID-19 emerging risk assessment for the construction industry of developing countries: Evidence from Iraq. International Journal of Construction Management, 24(7), pp. 693-706. ISSN 1562-3599
Al-Obaidi, T S A (2018) A transformational organisational framework for improving Iraqi quasi-governmental construction companies' performance. PhD thesis, University of Salford, UK.
Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. PhD thesis, University of California, Berkeley, USA.
Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.
Alasad, R and Motawa, I (2015) Dynamic demand risk assessment for toll road projects. Construction Management and Economics, 33(10), pp. 799-817. ISSN 01446193
Alasad, R; Motawa, I and Ogunlana, S (2012) A system dynamics-based method for demand forecasting in infrastructure projects: A case of PPP projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Alfadhli, A (2013) Does the alternative dispute resolution have a role to play in the construction industry in the State of Kuwait?: look into the most appropriate methodology that may be taken in Kuwait in comparison with what are available in the English legal system. PhD thesis, University of Southampton, UK.
Alghamdi, A M (2022) A systemic approach for construction contract claims settlement in the Kingdom of Saudi Arabia. PhD thesis, University of Reading, UK.
Alhajeri, M A (2004) Post-construction liabilities for latent defects in building and construction contracts: the theoretical foundations and the allocation of risk, a comparative study in Kuwaiti, French, and English Law. PhD thesis, University of Essex, UK.
Alshawi, M A and Hope, A E (1989) Expert systems and contractual disputes: Extension of time under JCT 80. Construction Management and Economics, 7(1), pp. 65-74. ISSN 01446193
Alshboul, O. and Shehadeh, A. (2026) Enhancing infrastructure project outcomes through optimized contractual structures and long-term warranties. Engineering, Construction and Architectural Management, 33(3), pp. 2220-2242. ISSN 0969-9988
Ameyaw, C; Mensah, S; Abaitey, B A and Asamoah-Duodu, A (2026) Adequacy of defects liability periods for public construction projects in Ghana. International Journal of Building Pathology and Adaptation, 44(1), pp. 55-69. ISSN 2398-4708
Amoah, C and Nkosazana, H (2022) Effective management strategies for construction contract disputes. International Journal of Building Pathology and Adaptation, 41(6), pp. 70-84. ISSN 23984708
Andrew, C and Thoms, I M (2012) Design and construction of the Gautrain rapid rail link. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 41-54. ISSN 17514312
Arditi, D and Chotibhongs, R (2005) Issues in subcontracting practice. Journal of Construction Engineering and Management, 131(8), pp. 866-876. ISSN 0733-9364
Asadi, R; Rotimi, J O B and Wilkinson, S (2023) Analyzing underlying factors of rework in generating contractual claims in construction projects. Journal of Construction Engineering and Management, 149(6): 04023036, ISSN 0733-9364
Asadi, R; Wilkinson, S and Rotimi, J O B (2021) Towards contracting strategy usage for rework in construction projects: A comprehensive review. Construction Management and Economics, 39(12), pp. 953-971. ISSN 01446193
Asadi, R; Wilkinson, S and Rotimi, J O B (2023) The common causes of rework in construction contracts: A diagnostic approach. Journal of Engineering, Design and Technology, 21(4), pp. 1107-1133. ISSN 1726-0531
Asadi, R; Wilkinson, S and Rotimi, J O B (2023) Mixed-method approach to the evaluation of rework provisions within general contract conditions. Construction Economics and Building, 23(3-4), pp. 45-70. ISSN 2204-9029
Asao, K; Miyamoto, T; Kato, H and Diaz, C E D (2013) Comparison of revenue guarantee programs in build-operation-transfer projects. Built Environment Project and Asset Management, 3(2), pp. 214-227. ISSN 2044-124X
Ashton, P and Gidado, K (2002) The identification of uncertainty and risk associated with inadequate site investigation procedures relative to project complexity. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Ashton, P and Gidado, K (2004) The practical application of a site investigation risk evaluation system. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Ashuri, B; Kashani, H; Molenaar, K R; Lee, S and Lu, J (2012) Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management, 138(4), pp. 545-557. ISSN 0733-9364
Au, Chung Yu Maria (2013) An optimal contract strategy in managing extension of time provisions in building contracts. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Ayala Collazo, I C (2023) An analysis of governing factors affecting diversity in local government capital improvement program implementation. DPA thesis, University of Baltimore, USA.
Ayus, A M B N (1992) Building contract claims: a comparative study (Scotland, England and Malaysia). PhD thesis, University of Aberdeen, UK.
Azman, M A (2016) Bidding competitiveness: A comparative analysis of different bid auctions in Malaysia. Journal of Engineering, Design and Technology, 14(4), pp. 678-698.
Baatz, N (2012) The UK Construction Act process plant exclusion. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 205-206. ISSN 17514312
Babatunde, S (2015) Developing public private partnership strategy for infrastructure delivery in Nigeria. PhD thesis, Northumbria University, UK.
Babatunde, S O; Ekundayo, D; Udeaja, C and Abubakar, U O (2022) An investigation into the sustainability practices in PPP infrastructure projects: A case of Nigeria. Smart and Sustainable Built Environment, 11(1), pp. 110-125. ISSN 2046-6099
Babatunde, S O; Perera, S; Zhou, L and Udeaja, C (2015) Barriers to public private partnership projects in developing countries: A case of Nigeria. Engineering, Construction and Architectural Management, 22(6), pp. 669-691. ISSN 0969-9988
Ballesteros-Lintao, R and Ameer Ali, N A N (2023) Readability and comprehensibility of Malaysian construction contracts. International Journal of Construction Management, 23(15), pp. 2649-2657. ISSN 1562-3599
Ballesteros-Pérez, P; González-Cruz, M C; Fuentes-Bargues, J L and Skitmore, M (2015) Analysis of the distribution of the number of bidders in construction contract auctions. Construction Management and Economics, 33(9), pp. 752-770. ISSN 01446193
Ballesteros-Pérez, P and Skitmore, M (2017) On the distribution of bids for construction contract auctions. Construction Management and Economics, 35(3), pp. 106-121. ISSN 01446193
Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; González-Cruz, M C; Pastor-Fernández, A and Otero-Mateo, M (2021) Standard deviation of bids for construction contract auctions. Journal of Construction Engineering and Management, 147(8): 04021096, ISSN 0733-9364
Ballesteros-Pérez, P; Skitmore, M; Das, R and Del Campo-Hitschfeld, M L (2015) Quick abnormal-bid-detection method for construction contract auctions. Journal of Construction Engineering and Management, 141(7): 4015010, ISSN 0733-9364
Ballesteros-Pérez, P; Skitmore, M; Pellicer, E and González-Cruz, M C (2015) Scoring rules and abnormally low bids criteria in construction tenders: A taxonomic review. Construction Management and Economics, 33(4), pp. 259-278. ISSN 01446193
Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice. PhD thesis, Coventry University, UK.
Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal. PhD thesis, University of Southampton, UK.
Bateman, G H (2009) The IChemE international forms of contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 169-174. ISSN 17514304
Baxendale, A T (1992) Construction management information systems for production control. PhD thesis, Bristol Polytechnic, UK.
Bayraktar, M E; Cui, Q; Hastak, M and Minkarah, I (2006) Warranty bonds from the perspective of surety companies. Journal of Construction Engineering and Management, 132(4), pp. 333-337. ISSN 0733-9364
Bernie, J and Howes, R (1983) Project management control using real-time budgeting and forecasting models. Construction Papers, 2(1), pp. 19-40. ISSN 0144-8587
Besaiso, H; Fenn, P; Emsley, M and Wright, D (2018) A comparison of the suitability of FIDIC and NEC conditions of contract in Palestine: A perspective from the industry. Engineering, Construction and Architectural Management, 25(2), pp. 241-256. ISSN 0969-9988
Betts, M P (1987) Coordinated information retrieval for building contractors' tendering. PhD thesis, Polytechnic of the South Bank, UK.
Bhargava, A; Anastasopoulos, P C; Labi, S; Sinha, K C and Mannering, F L (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), pp. 1207-1218. ISSN 0733-9364
Bick, P (1997) Statutory reform of aspects of construction law in Australia. Construction Management and Economics, 15(6), pp. 549-558. ISSN 01446193
Bing, L; Tiong, R L K; Fan, W W and Chew, D A S (1999) Risk management in international construction joint ventures. Journal of Construction Engineering and Management, 125(4), pp. 277-284. ISSN 0733-9364
Blay-Armah A, R A (2013) The impact of varying asset specificities of subcontractors on relationships development in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Boudjabeur, S (1997) Design and build defined. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Boukendour, S (2007) Preventing post-contractual opportunism by an option to switch from one contract to another. Construction Management and Economics, 25(7), pp. 723-727. ISSN 1466433X
Bowes, D (2007) Practitioners' perception of adjudication in UK construction. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Bowes, D and Arnold, S (2009) The engineering and construction contract and its implications for project programming procedures. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Br chner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(2), pp. 91-101. ISSN 0969-9988
Braimah, N; Ndekugri, I and Gameson, R (2006) A review of industry standards and publications/charts for adjusting productivity losses in construction contracts. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Brand, M C and Davenport, P (2011) Proposal for a "dual scheme" model of statutory adjudication for the Australian building and construction industry. International Journal of Law in the Built Environment, 3(3), pp. 252-268. ISSN 1756-1450
Brand, M C and Uher, T E (2004) Adjudication determinations in Australia. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Brawn, D (2012) Extensions of time and liquidated damages in construction contracts in England and Wales. International Journal of Law in the Built Environment, 4(1), pp. 75-90. ISSN 1756-1450
Brown, B H J (1974) An econometric forecasting model for a segment of the construction market. PhD thesis, Oklahoma State University, USA.
Bubbers, G and Christian, J (1992) Hypertext and claim analysis. Journal of Construction Engineering and Management, 118(4), pp. 716-730. ISSN 0733-9364
Buckley, A M (2022) The impact of corporate social responsibility on construction workers. DProf thesis, London Metropolitan University, UK.
Burke, C K A (2015) Generating social value through public sector construction procurement: A study of local authorities and SMEs. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Campo, S (2002) Asymmetry and risk aversion in first -price sealed bid auctions: Identification, estimation, and applications. PhD thesis, University of Southern California, USA.
Candaş, A B (2022) Multipurpose semantic analysis of construction text documentation. PhD thesis, Middle East Technical University, Turkey.
Candaş, A B and Tokdemir, O B (2022) Automated identification of vagueness in the FIDIC silver book conditions of contract. Journal of Construction Engineering and Management, 148(4): 04022007, ISSN 0733-9364
Candaş, A B and Tokdemir, O B (2022) Automating coordination efforts for reviewing construction contracts with multilabel text classification. Journal of Construction Engineering and Management, 148(6): 04022027, ISSN 0733-9364
Carbonara, N and Pellegrino, R (2018) Revenue guarantee in public-private partnerships: A win–win model. Construction Management and Economics, 36(10), pp. 584-598. ISSN 01446193
Carmichael, D G and Karantonis, J P (2015) Construction contracts with conversion capability: A way forward. Journal of Financial Management of Property and Construction, 20(2), pp. 132-146. ISSN 1366-4387
Carmichael, S and Murray, M (2006) Record keeping for contemporaneous delay analysis: A model for effective event management. Construction Management and Economics, 24(10), pp. 1007-1018. ISSN 1466433X
Carmo, Lie Uema do (2012) Construction contracts of large projects. PhD thesis, Universidade de São Paulo, Brazil.
Cartigny, T and Lord, W (2019) Evaluating social value in the UK construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 8-16. ISSN 17514304
Carty, G J (1995) Construction. Journal of Construction Engineering and Management, 121(3), pp. 319-328. ISSN 0733-9364
Ceran, N (2002) Private participation in infrastructure: A risk analysis of long-term contracts in power sector. PhD thesis, George Mason University, USA.
Chadee, A A; Martin, H; Chadee, X T; Bahadoorsingh, S and Olutoge, F (2023) Root cause of cost overrun risks in public sector social housing programs in sids: Fuzzy synthetic evaluation. Journal of Construction Engineering and Management, 149(11): 04023106, ISSN 0733-9364
Chammout, B; El-Adaway, I H; Abdul Nabi, M and Assaad, R H (2024) Price escalation in construction projects: Examining national and international contracts. Journal of Construction Engineering and Management, 150(9): 04024109, ISSN 0733-9364
Chan, A P C and Yeong, C M (1995) A comparison of strategies for reducing variations. Construction Management and Economics, 13(6), pp. 467-473. ISSN 01446193
Chan, C F P (2001) The development of construction law in singapore. PhD thesis, University of London, UK.
Chan, E H W and Au, M C Y (2008) Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations. Journal of Construction Engineering and Management, 134(9), pp. 673-680. ISSN 0733-9364
Chan, H-W E (2003) A study of factors relevant to disputes arising in international construction projects involving both European and Asian cultural factors. PhD thesis, King's College London, UK.
Chan, Hon-Wan Edwin (2003) A study of contractual provisions relevant to disputes arising in international construction projects involving both European and East Asian cultural factors. PhD thesis, King's College London (University of London), UK.
Chang, C Y (2014) Principal-agent model of risk allocation in construction contracts and its critique. Journal of Construction Engineering and Management, 140(1): 04013032, ISSN 0733-9364
Chang, L M and Chen, P H (2001) BOT financial model: Taiwan high speed rail case. Journal of Construction Engineering and Management, 127(3), pp. 214-222. ISSN 0733-9364
Chaphalkar, N and Iyer, K C (2014) Factors influencing decisions on delay claims in construction contracts for Indian scenario. Construction Economics and Building, 14(1), pp. 32-44. ISSN 2204-9029
Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts. PhD thesis, Indian Institute of Technology Delhi, India.
Charkhakan, M H and Heravi, G (2019) Evaluating the preventability of conflicts arising from change occurrence in construction projects. Engineering, Construction and Architectural Management, 26(8), pp. 1777-1800. ISSN 0969-9988
Charlson, J (2021) Emerging trends in construction law at the confluence of academia and industry. PhD thesis, University of Wolverhampton, UK.
Charlson, J; Baldwin, R and Harrison, J (2014) Early perceptions of allowing adjudication of oral contracts. International Journal of Law in the Built Environment, 6(3), pp. 233-249. ISSN 1756-1450
Charlson, J and Oduoza, C (2014) Legal risk identification for SMEs in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Chau, K W; Poon, S W; Wang, Y S and Lu, L L (2005) Technological progress and the productive efficiency of construction firms in Hong Kong, 1981-2001. Journal of Construction Research, 6(2), pp. 195-207. ISSN 1609-9451
Chen, H-L (2002) Development of a systematic integration approach for multi-level cost flow prediction and management. PhD thesis, University of Florida, USA.
Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Chen, Y; Wang, W; Zhang, S and You, J (2018) Understanding the multiple functions of construction contracts: The anatomy of FIDIC model contracts. Construction Management and Economics, 36(8), pp. 472-485. ISSN 01446193
Cheung, S O; Suen, H C H and Lam, T I (2002) Fundamentals of alternative dispute resolution processes in construction. Journal of Construction Engineering and Management, 128(5), pp. 409-417. ISSN 0733-9364
Chong, H-Y and Oon, C K (2016) A practical approach in clarifying legal drafting: Delphi and case study in Malaysia. Engineering, Construction and Architectural Management, 23(5), pp. 610-621. ISSN 0969-9988
Chong, W K O (2005) Construction production rate information system for highway projects. PhD thesis, University of Texas at Austin, USA.
Cockerill, J E (1993) The construction industry in belfast 1800-1914. PhD thesis, Queen's University Belfast, UK.
Coggins, Jeremy Keith (2012) A proposal for harmonisation of security of payment legislation in the Australian building and construction industry. PhD thesis, University of Adelaide, Australia.
Coleman, C E; Mwanaumo, E M; Muya, M and Rahman, R A (2025) Financial challenges leading to premature contract termination in Ghanaian construction industry: Causes and mitigation strategies. Journal of Construction Business and Management, 7(2), pp. 45-66.
Cooke, John Richard (1973) Methods of documentation and administration of building contracts. PhD thesis, University of New South Wales, Australia.
Coombe-Davies, M (1985) The laws on contract liability as they specifically relate to architectural practice. PhD thesis, University College Cardiff, UK.
Costantino, N and Pietroforte, R (2004) Production arrangements by us building and non-building contractors: An update. Construction Management and Economics, 22(3), pp. 231-235. ISSN 01446193
Cotton, A P; Sohail, M and Scott, R E (2005) Towards improved labour standards for construction of minor works in low income countries. Engineering, Construction and Architectural Management, 12(6), pp. 617-632. ISSN 0969-9988
Cox, A and Furlong, P (1995) European procurement rules and national preference: Explaining the local sourcing of public works contracts in the EU in 1993. Journal of Construction Procurement, 1(2), pp. 87-99. ISSN 1358-9180
Craig, R W (2000) Controversial aspects of Commonwealth Construction and Engineering Procurement Law. PhD thesis, Loughborough University, UK.
Crawley, S E (2017) The difference in how UAE and EW law controls Gharar (risk) and so Riba in a construction contract in the Emirate of Dubai, UAE. PhD thesis, Robert Gordon University, UK.
Crowe, P (2014) Motivation agenda for social empowerment and respect for people during the drafting of construction contracts. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Crowe, P and Fortune, C J (2012) A preliminary method of classifying collaborative contractual behaviour in higher education construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Cui, L (2025) Incentive contract design and selection for inhibiting unethical collusion in construction projects. Engineering, Construction and Architectural Management, 32(2), pp. 870-892. ISSN 0969-9988
Dagenais, D A (2007) Introduction to good faith in construction contracts. Construction Management and Economics, 25(7), pp. 715-721. ISSN 1466433X
Davenport, P and Brand, M C (2013) The effectiveness of time bar clauses following the high court in decision in Andrews v. Australia and New Zealand Banking Group. International Journal of Law in the Built Environment, 5(3), pp. 241-252. ISSN 17561469
Day, K D (1989) The administration of the 'botched' FIDIC contract: the problems arising out of the administration of a wrongly 'slanted' contract for turnkey projects. PhD thesis, University of Southampton, UK.
De La Garza, J M; Prateapusanond, A and Ambani, N (2007) Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11), pp. 836-845. ISSN 0733-9364
De Marco, A; Mangano, G; Cagliano, A C and Grimaldi, S (2012) Public financing into build-operate-transfer hospital projects in Italy. Journal of Construction Engineering and Management, 138(11), pp. 1294-1302. ISSN 0733-9364
De Silva, D G (2002) Asymmetries in procurement auctions. PhD thesis, University of Oklahoma, USA.
Deacon, H A and Kajimo-Shakantu, K (2024) The prevalence of claims under the JBCC principal building agreement in South Africa. International Journal of Construction Management, 24(3), pp. 331-338. ISSN 1562-3599
Deltas, G M (1996) Essays in auctions and procurement: An analysis of bidding rings, left bids, stochastic properties of winning bids, and two step structural estimators of bidding for contracts. PhD thesis, Yale University, USA.
Demirel, H Ç; Leendertse, W; Volker, L and Hertogh, M (2017) Flexibility in PPP contracts: Dealing with potential change in the pre-contract phase of a construction project. Construction Management and Economics, 35(4), pp. 196-206. ISSN 0144-6193
Deng, X; Ding, S and Tian, Q (2004) Reasons underlying a mandatory high penalty construction contract bonding system. Journal of Construction Engineering and Management, 130(1), pp. 67-74. ISSN 0733-9364
Diekmann, J E and Nelson, M C (1985) Construction claims: Frequency and severity. Journal of Construction Engineering and Management, 111(1), pp. 74-81. ISSN 0733-9364
Donohoe, S (2010) Attitudes to sustainable construction and contracts: International perspectives and approaches. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Donohoe, S and Coggins, J (2011) Liquidated damages in construction contracts: Is there a schism between the Australian and English courts? In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Donohoe, S and Coggins, J K (2015) Soft landings or a bumpy touch down? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Donohoe S, C J (2013) Enforceability of exemption clauses in construction contracts: A comparative study of approaches in England and Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Dosumu, O; Idoro, G and Onukwube, H (2017) Causes of errors in construction contract documents in Southwestern, Nigeria. Journal of Construction Business and Management, 1(2), pp. 11-23. ISSN 2521-0165
Dow, I; Ross, A D and Sertyesilisik, B (2009) An investigation on the cost implications of methodology of subcontract work pricing. Journal of Financial Management of Property and Construction, 14(2), pp. 98-125. ISSN 1366-4387
Dowsett, R and Harty, C (2015) Moving from static to dynamic measures of BIM success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Drew, D S (1994) The effect of contract type and size on competitiveness in construction contract bidding. PhD thesis, University of Salford, UK.
Duffield, Colin F (2001) An evaluation framework for privately funded infrastructure projects in Australia. PhD thesis, University of Melbourne, Australia.
Eadie, R; Perera, S; Heaney, G and Carlisle, J (2007) Construction contractor's perspective on web-based advertising of public sector construction contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Eaglestone, F N (1993) An improved method of requesting insurance under UK construction contracts. PhD thesis, City, University of London, UK.
Edouni, A R (2004) Competitive bidding, contractor pre-qualifying, and their impact on public works construction contracting: An analysis of municipal public works construction contracting in California. DPA thesis, University of La Verne, USA.
Ehoff Jr., C E (1992) Removed from scheduled maintenance: An inquiry into the problems threatening the survival of United States elevator manufacturers. PhD thesis, Golden Gate University, USA.
Eilers, H I (2015) Impact of sustainable business practices on strategic performance for commercial building contractors. PhD thesis, University of Kansas, USA.
Ekung, S; Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: A multivariate analysis. African Journal of Built Environment Research, 5(1), pp. 19-40. ISSN 2414-0236
El Nemr, W (2017) The enforceability of time bar clauses in construction contracts: a comparative analysis between the Egyptian civil code and the English and Welsh common law jurisdictions. PhD thesis, University of Salford, UK.
El-Kholy, A M and Akal, A Y (2021) Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects. Engineering, Construction and Architectural Management, 28(10), pp. 3014-3040. ISSN 0969-9988
El-Sharkawy, A R (1993) Pricing construction contracts under inflation. PhD thesis, North Carolina State University, USA.
Elazhary, M. and El-Adaway, I. H. (2026) Managing risks under nuclear power plant projects: A latent similarity-guided contract customization. Journal of Construction Engineering and Management, 152(7): 04026089, ISSN 0733-9364
Elazouni, A M and Metwally, F G (2000) D-sub: Decision support system for subcontracting construction works. Journal of Construction Engineering and Management, 126(3), pp. 191-199. ISSN 0733-9364
Eldosoky, A I (1987) Dealing with uncertainty in construction projects with particular reference to Egypt. PhD thesis, University of Manchester, UK.
Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects. PhD thesis, Heriot-Watt University, UK.
Emmitt, S; Pasquire, C and Mertia, B (2012) Is good enough "making do"? An investigation of inappropriate processing in a small design and build company. Construction Innovation, 12(3), pp. 369-383. ISSN 1471-4175
Enshassi, A; Mohamed, S and Madi, I (2005) Factors affecting accuracy of cost estimation of building contracts in the Gaza Strip. Journal of Financial Management of Property and Construction, 10(2), pp. 115-125. ISSN 1366-4387
Eom, C S J; Yun, S H and Paek, J H (2008) Subcontractor evaluation and management framework for strategic partnering. Journal of Construction Engineering and Management, 134(11), pp. 842-851. ISSN 0733-9364
Erikson, C A (1979) Risk sharing in construction contracts. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Ernest, K; Theophilus, A K; Amoah, P and Emmanuel, B B (2019) Identifying key economic indicators influencing tender price index prediction in the building industry: A case study of Ghana. International Journal of Construction Management, 19(2), pp. 106-112. ISSN 1562-3599
Farid, F (1981) Fair and reasonable markup (FaRM) pricing model: A present value approach to pricing of construction contracts. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Farid, F (1990) Pricing construction contracts under Tax Reform Act of 1986. Journal of Construction Engineering and Management, 116(2), pp. 300-315. ISSN 0733-9364
Faruqi, S and Smith, N J (1997) Karachi light rail transit: A private finance proposal. Engineering, Construction and Architectural Management, 4(3), pp. 233-246. ISSN 0969-9988
Fatayer, F A; Issa, A Z; Abunemeh, M and Dwikat, M A M (2022) Investigating the causes preventing the fulfillment of construction contract requirements. Engineering, Construction and Architectural Management, 29(7), pp. 2577-2598. ISSN 0969-9988
Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193
Felllows, R F (1988) Escalation management. PhD thesis, University of Reading, UK.
Fenn, F P (1999) An aetiology of construction disputes. PhD thesis, University of Manchester, UK.
Fennell, P; Ruyssevelt, P and Smith, A Z P (2016) Financial viability of school retrofit projects for clients and ESCOs. Building Research & Information, 44(8), pp. 889-11. ISSN 0961-3218
Fieldson, R (2017) The afterlife clause; towards a strategy for improved adaptation in retail property. International Journal of Building Pathology and Adaptation, 35(4), pp. 364-379.
Finnie, D (2013) Comparison of time adjustment clauses between DZ3910, AS4000 and STCC. Construction Economics and Building, 13(1), pp. 66-84. ISSN 2204-9029
Finnie, D; Ali, N A and Park, K (2018) Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(4), pp. 176-185. ISSN 17514304
Finnie, D; Ameer Ali, N and Park, K (2021) Early contractor involvement: a review of pre-construction service agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 143-150. ISSN 17514304
Fisher, R B (2004) Partnering public sector construction contracts: A conflict avoidance process. PhD thesis, Virginia Commonwealth University, USA.
Flanagan, R and Norman, G (1985) Sealed bid auctions: An application to the building industry. Construction Management and Economics, 3(2), pp. 145-161. ISSN 01446193
Fogarty, H (2009) Contractor perspective of the new Irish public works contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 29-34. ISSN 17514312
Forcada, N; Macarulla, M and Love, P E D (2013) Assessment of residential defects at post-handover. Journal of Construction Engineering and Management, 139(4), pp. 372-378. ISSN 0733-9364
Frame, S M (1969) A descriptive study of the relationship of an economic index and school construction bid economy in fourteen Southern California counties. EdD thesis, New Mexico State University, USA.
Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.
Fu, W K (2004) The effect of experience in construction contract bidding. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Fu, W K; Drew, D S and Lo, H P (2003) Competitiveness of inexperienced and experienced contractors in bidding. Journal of Construction Engineering and Management, 129(4), pp. 388-395. ISSN 0733-9364
Gaafar, H K (1997) Risk allocations in standard forms of engineering and construction contract. PhD thesis, University of Birmingham, UK.
Gaafar, H K and Perry, J G (1999) Strategies for insuring subcontracted works. Construction Management and Economics, 17(3), pp. 383-391. ISSN 01446193
Gambo, N; Said, I and Ismail, R (2017) Mediation model for improving cost factors that affect performance of small-scale building construction contract business in Nigeria: A PLS-SEM approach. International Journal of Construction Education and Research, 13(1), pp. 24-46. ISSN 1557-8771
Ganesan, S and Kelsey, J (2006) Technology transfer: International collaboration in Sri Lanka. Construction Management and Economics, 24(7), pp. 743-753. ISSN 1466433X
Gao, Y; Gan, Y; Chen, Y and Chen, Y (2025) Application of large language models to intelligently analyze long construction contract texts. Construction Management and Economics, 43(3), pp. 226-242. ISSN 0144-6193
Gatley, D (2004) A critical examination of building contracts in New Zealand: an investigation into the types of building contracts employed ; their formation and administration ; and into the incidence, nature and resolution of disputes resulting from their usage ; in the commercial and residential sectors of the construction industry in New Zealand. PhD thesis, RMIT University, Australia.
Georgiou, J; Smith, J and Love, P (2003) Building registration: Training and housing quality. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Gibbs, D. J.; Lord, W.; Emmitt, S. B. A. and Ruikar, K. (2015) BIM and construction contracts: Cpc 2013's approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 285-293. ISSN 1751-4304
Gibbs, D J; Lord, W; Emmitt, S B A and Ruikar, K (2015) BIM and construction contracts: CPC 2013’s approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 285-293. ISSN 17514304
Glendinning, M (1991) 'Give the people homes!': Britain's multi-storey housing drive. PhD thesis, University of Edinburgh, UK.
Goh, B H (1998) Forecasting residential construction demand in Singapore: A comparative study of the accuracy of time series, regression and artificial neural network techniques. Engineering, Construction and Architectural Management, 5(3), pp. 261-275. ISSN 0969-9988
Goodrum, P M; Wan, Y and Fenouil, P C (2009) A decision-making system for accelerating roadway construction. Engineering, Construction and Architectural Management, 16(2), pp. 116-135. ISSN 0969-9988
Gould, N (1998) Alternative dispute resolution in the UK construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Granheimer, K; Gustavsson, T K and Eriksson, P E (2021) Public procurement of engineering services: Governance and control mechanisms. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Gransberg, Nils (2021) A critical analysis of construction manager-at-risk project delivery in public university capital projects. PhD thesis, University of Oklahoma, USA.
Greenwood, D (2001) Subcontract procurement: are relationships changing? Construction Management and Economics, 19(1), pp. 5-7. ISSN 01446193
Greenwood, D; Hogg, K and Kan, S (2005) Subcontractors' liability for project delay. Journal of Financial Management of Property and Construction, 10(2), pp. 107-114. ISSN 1366-4387
Greenwood, D J (2001) Power and proximity: A study of subcontract formation in the UK building industry. PhD thesis, University of Reading, UK.
Greenwood, D J and Shaglouf, A A (1997) Comparison between planned and actual durations in medium sized building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Gregory-Stevens, J; Frame, I and Henjewele, C (2016) Mediation in construction disputes in England. International Journal of Law in the Built Environment, 8(2), pp. 123-136. ISSN 1756-1450
Gruneberg, S and Hughes, W P (2004) Analysing the types of procurement used in the UK: A comparison of two data sets. Journal of Financial Management of Property and Construction, 9(2), pp. 63-74. ISSN 1366-4387
Gunduz, M and Elsherbeny, H A (2020) Critical assessment of construction contract administration using fuzzy structural equation modeling. Engineering, Construction and Architectural Management, 27(6), pp. 1233-1255. ISSN 0969-9988
Gunduz, M and Elsherbeny, H A (2020) Operational framework for managing construction-contract administration practitioners' perspective through modified Delphi method. Journal of Construction Engineering and Management, 146(3): 04019110, ISSN 0733-9364
Gunduz, M and Elsherbeny, H A (2021) Critical assessment of contract administration using multidimensional fuzzy logic approach. Journal of Construction Engineering and Management, 147(2): 04020162, ISSN 0733-9364
Gunner, J and Skitmore, M (1999) Comparative analysis of pre-bid forecasting of building prices based on Singapore data. Construction Management and Economics, 17(5), pp. 635-646. ISSN 01446193
Gunner, J C (1997) A model of building price forecasting accuracy. PhD thesis, University of Salford, UK.
Gurgun, A P and Koc, K (2022) Administrative risks challenging the adoption of smart contracts in construction projects. Engineering, Construction and Architectural Management, 29(2), pp. 989-1015. ISSN 0969-9988
Gurgun, A P and Koc, K (2023) The role of contract incompleteness factors in project disputes: A hybrid fuzzy multi-criteria decision approach. Engineering, Construction and Architectural Management, 30(9), pp. 3895-3926. ISSN 0969-9988
Habyalimana, J-B (1989) Change orders and construction projects characteristics: A relational quantitative study. PhD thesis, University of Missouri - Columbia, USA.
Hackett, J A (2011) The role of cost estimators in UK construction: a case for, and steps towards, an estimating profession. PhD thesis, University of Birmingham, UK.
Hackett, J A and Hicks, C M (2007) Estimating as a profession in UK construction. Engineering, Construction and Architectural Management, 14(1), pp. 26-51. ISSN 0969-9988
Haddad, B (2007) Risk management in the contractual language in the construction industry: The effect of exculpatory clauses on contractor bid price. PhD thesis, Indiana State University, USA.
Hailu, H and Tshehla, M (2025) A conceptual framework for enhancing subcontracting performance in the construction industry of developing countries. Journal of Construction Business and Management, 7(2), pp. 1-15.
Haj Kazem Kashani, H (2012) A real options model for the financial valuation of infrastructure systems under uncertainty. PhD thesis, Georgia Institute of Technology, USA.
Halligan, D W; Hester, W T and Thomas, H R (1987) Managing unforeseen site conditions. Journal of Construction Engineering and Management, 113(2), pp. 273-287. ISSN 0733-9364
Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions. PhD thesis, Illinois Institute of Technology, USA.
Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364
Hanna, A S; Thomas, G and Swanson, J R (2013) Construction risk identification and allocation: Cooperative approach. Journal of Construction Engineering and Management, 139(9), pp. 1098-1107. ISSN 0733-9364
Hartman, F and Snelgrove, P (1996) Risk allocation in lump-sum contracts: concept of latent dispute. Journal of Construction Engineering and Management, 122(3), pp. 291-296. ISSN 0733-9364
Hashem M. Mehany, M S and Guggemos, A (2015) Risk management for asphalt road construction and maintenance under performance-based contracts. International Journal of Construction Education and Research, 11(4), pp. 292-315. ISSN 1557-8771
Hassan, F U; Le, T and Le, C (2023) Automated approach for digitalizing scope of work requirements to support contract management. Journal of Construction Engineering and Management, 149(4): 04023005, ISSN 0733-9364
Hassan, Fahad Ul (2022) Digitalization of construction project requirements using natural language processing (NLP) techniques. PhD thesis, Clemson University, USA.
Hassanein, A A G and Afify, H M F (2007) Risk management practices of contractors: A case study of power station projects in Egypt. Journal of Financial Management of Property and Construction, 12(3), pp. 164-179. ISSN 1366-4387
Hassanein, M A A G (1990) Mechanisms for transfer of price risk of construction materials. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hassanien, A (2003) Analysing hotel repositioning through property renovation in the hospitality industry. PhD thesis, University of Strathclyde, UK.
Hauptfleisch, A C (1989) The development of building process relationships with special reference to South Africa. PhD thesis, University of Pretoria, South Africa.
Hawwash, K and Barnes, M (1997) The potential for adopting the NEC's family of contracts on PFI projects. Engineering, Construction and Architectural Management, 4(3), pp. 203-214. ISSN 0969-9988
Herbsman, Z and Ellis, R (1992) Multiparameter bidding system: innovation in contract administration. Journal of Construction Engineering and Management, 118(1), pp. 142-150. ISSN 0733-9364
Hewavitharana, S; Perera, A; Perera, S; Perera, P and Nanayakkara, S (2025) Framework for systematic adoption of ERP systems in the Sri Lankan construction industry. Built Environment Project and Asset Management, 15(3), pp. 629-646. ISSN 2044-124X
Hide, G (2010) Managing a programme under the NEC3 ECC contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 111-119. ISSN 17514312
Hide, G (2010) Producing a programme under the NEC form of contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(2), pp. 59-64. ISSN 17514312
Hillig, J B; Dan-Asabe, D; Donyavi, S; Dursun, O and Thampuratty, A (2010) Fidic's red book 1999 edition: A study review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 129-133. ISSN 17514312
Hinze, J and Antal, T (1991) Construction contract provisions for preservation of artifacts. Journal of Construction Engineering and Management, 117(1), pp. 106-117. ISSN 0733-9364
Hinze, J and Couey, J (1989) Weather in construction contracts. Journal of Construction Engineering and Management, 115(2), pp. 270-283. ISSN 0733-9364
Hinze, J and Tracey, A (1994) The contractor-subcontractor relationship: The subcontractor's view. Journal of Construction Engineering and Management, 120(2), pp. 274-287. ISSN 0733-9364
Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hoare, D and Broome, J (2001) Bills of quantities versus activity schedules for civil engineering projects. Journal of Construction Procurement, 7(1), pp. 11-26. ISSN 1358-9180
Holt, G D (1995) A methodology for predicting the performance of construction contractors. PhD thesis, University of Wolverhampton, UK.
Hosseinian, S M; Andalib, M and Carmichael, D G (2022) Appropriate types of payments in construction contracts based on agency theory parameters. Journal of Construction Engineering and Management, 148(1): 04021187, ISSN 0733-9364
Hosseinian, S M and Carmichael, D G (2013) Optimal incentive contract with risk-neutral contractor. Journal of Construction Engineering and Management, 139(8), pp. 899-909. ISSN 0733-9364
Hosseinian, S M; Farahpour, E and Carmichael, D G (2021) An optimum multiple outcomes sharing model with multiple risk-averse agents. Engineering, Construction and Architectural Management, 28(9), pp. 2788-2810. ISSN 0969-9988
Hosseinian, S M and Jaberi, A (2024) Optimal sharing of construction project outcomes with downstream contracting parties: Principal-agent analysis. Journal of Construction Engineering and Management, 150(2): 04023156, ISSN 0733-9364
Hosseinian, S M and Tavakoli, M (2023) Markets, hierarchies, or hybrids as alternative governance structures in construction contracts: Transaction cost economics analysis. Journal of Construction Engineering and Management, 149(1): 04022149, ISSN 0733-9364
Huang, Y L and Chou, S P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(4), pp. 379-389. ISSN 01446193
Huang, Y L and Pi, C C (2014) Real-option valuation of build-operate-transfer infrastructure projects under performance bonding. Journal of Construction Engineering and Management, 140(5): 04013068, ISSN 0733-9364
Hughes, J (2020) Global claims in engineering and construction contracts. PhD thesis, University of Strathclyde, UK.
Huh, Y (2004) Highway bridge construction production rates for time estimation. PhD thesis, University of Texas at Austin, USA.
Hui, K J (2008) Court decisions on building contract disputes: a Coasian empirical analysis. PhD thesis, University of Hong Kong, Hong Kong.
Hulett, D A (2001) The disintegration and reintegration of building contractors' management systems. PhD thesis, University of Salford, UK.
Hutcheson, John M (1979) Administration of building contracts with particular reference to the builder's financial control. PhD thesis, University of New South Wales, Australia.
Hymes, S J (2010) Front end specifications and the propagation of construction claims. DSc thesis, Washington University in St. Louis, USA.
Ibbs, C W (1985) Product specification practices and problems. Journal of Construction Engineering and Management, 111(2), pp. 157-172. ISSN 0733-9364
Ibbs, C W (1986) Brand name or equalproduct specifications. Journal of Construction Engineering and Management, 112(1), pp. 1-13. ISSN 0733-9364
Ibbs, C W (1991) Innovative contract incentive features for construction. Construction Management and Economics, 9(2), pp. 157-169. ISSN 01446193
Ibbs, C W and Ashley, D B (1987) Impact of various construction contract clauses. Journal of Construction Engineering and Management, 113(3), pp. 501-521. ISSN 0733-9364
Ibbs, W; Nguyen, L D and Simonian, L (2011) Concurrent delays and apportionment of damages. Journal of Construction Engineering and Management, 137(2), pp. 119-126. ISSN 0733-9364
Ikediashi, D I and Okolie, K C (2022) An assessment of risks associated with contractor's cash flow projections in South-South, Nigeria. International Journal of Construction Management, 22(11), pp. 2051-2058. ISSN 1562-3599
Ioannou, P G and Leu, S S (1993) Average-bid method: competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147. ISSN 0733-9364
Islam, M M and Mohamed, S (2009) Bid-winning potential optimization for concession schemes with imprecise investment parameters. Journal of Construction Engineering and Management, 135(8), pp. 690-700. ISSN 0733-9364
Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X
Jafari, Parinaz (2021) A framework for enhancing contract-related documentation in construction. PhD thesis, University of Alberta, Canada.
Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.
Jensen Jr., D A (1993) Liquidated damages clauses in construction contracts: A study of the application preference of the three-prong test by the appellate court system. PhD thesis, Texas A&M University, USA.
Jensen Jr, D A and Craig Jr, J W (1998) The impact of TAMRA '88 on US construction accounting practices. Construction Management and Economics, 16(3), pp. 303-313. ISSN 01446193
Jensen Jr, D A and Craig Jr, J W (1998) Testing the validity of liquidated damages clauses: Measuring the application preference and consistency of the intent test as applied by the United States court system. Construction Management and Economics, 16(3), pp. 269-281. ISSN 01446193
Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Modeling framework to quantify and gauge project cost risks due to construction material price volatilities using predictive probabilistic deep-learning algorithms and stochastic risk modeling. Journal of Construction Engineering and Management, 151(7): 04025071, ISSN 0733-9364
Jiang, A (2012) Negotiating construction contracts through practical cash flow planning and analysis model. International Journal of Construction Management, 12(2), pp. 23-33. ISSN 1562-3599
Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364
Kadefors, A (2005) Fairness in interorganizational project relations: Norms and strategies. Construction Management and Economics, 23(8), pp. 871-878. ISSN 01446193
Kaka, A and Price, A D F (1991) Relationship between value and duration of construction projects. Construction Management and Economics, 9(4), pp. 383-400. ISSN 01446193
Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(1), pp. 48-60. ISSN 0969-9988
Kakitahi, J M (2014) Causality, magnitude and impact mitigation of rework in Uganda. PhD thesis, Lund University, Sweden.
Kakitahi, J M; Alinaitwe, H M; Landin, A and Mone, S J (2016) Impact of construction-related rework on selected Ugandan public projects. Journal of Engineering, Design and Technology, 14(2), pp. 238-251.
Kakitahi, J M; Landin, A and Alinaitwe, H M (2013) An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266-280. ISSN 1471-4175
Kapambwe, F C (2003) An evaluation of the implications of equity foreign direct investment risks in BOT infrastructure projects for overseas contractors in sub-Saharan Africa. PhD thesis, University of Reading, UK.
Kapote, M M and Pimplikar, S S (2025) Identification of challenges and shortcomings in the selection of bidders on road projects in India: a study. International Journal of Construction Management, 25(7), pp. 760-769. ISSN 1562-3599
Karacigan, A; Cağlayan, S; Tezel, A and Özorhon, B (2025) Strategic roadmap to achieve successful implementation of blockchain technology in construction contract management. Journal of Construction Engineering and Management, 151(11): 04025185, ISSN 0733-9364
Kashiwagi, K; Rubin, R A and Harris, M R (1988) Construction law and practice in Japan. Journal of Construction Engineering and Management, 114(1), pp. 104-113. ISSN 0733-9364
Kehinde, J O and Aiyetan, O A (2002) A study of the nature of contractual claims in building contracts in Nigeria. Journal of Financial Management of Property and Construction, 7(3), pp. 197-202. ISSN 1366-4387
Kennedy, P; Morrison, A and Milne, D O (1997) Resolution of disputes arising from set-off clauses between main contractors and subcontractors. Construction Management and Economics, 15(6), pp. 527-537. ISSN 01446193
Keskiniva, K; Saari, A and Junnonen, J M (2023) Suggestions for takt production subcontract clauses: A conceptual study. Construction Innovation, 23(2), pp. 425-442. ISSN 1471-4175
Khallaf, R (2016) Interactional risks associated with parties to a PPP project. PhD thesis, Purdue University, USA.
Khazaeni, G and Khazaeni, A (2026) Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm. International Journal of Building Pathology and Adaptation, 44(1), pp. 208-222. ISSN 2398-4708
Khurana, M; Garvin, M J and Mahalingam, A (2022) Synthesis of relational practices for PPP contracts and their linkage with governance mechanisms. Journal of Construction Engineering and Management, 148(12): 04022131, ISSN 0733-9364
Kidd, A; Appelbe, S and Morgan, A (2015) The use and abuse of programmes in construction contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 294-301. ISSN 17514304
Kilian, J J and Gibson, G E (2005) Construction litigation for the U.S. Naval facilities engineering command, 1982-2002. Journal of Construction Engineering and Management, 131(9), pp. 945-952. ISSN 0733-9364
Kim, D Y (2011) Construction planning and execution strategies for enhancing project success on electrical construction subcontracts. PhD thesis, University of Texas at Austin, USA.
Kim, M P and Adams, K (1989) An expert system for construction contract claims. Construction Management and Economics, 7(3), pp. 249-262. ISSN 01446193
Klimas, E (2011) A general duty to co-operate in construction contracts? An international review. International Journal of Law in the Built Environment, 3(1), pp. 83-96. ISSN 1756-1450
Klopper, C H (1986) An investigation into and evaluation of the cost reimbursable basis for building contracts. DSc thesis, University of Pretoria, South Africa.
Koc, K and Gurgun, A P (2022) Ambiguity factors in construction contracts entailing conflicts. Engineering, Construction and Architectural Management, 29(5), pp. 1946-1964. ISSN 0969-9988
Koc, K and Pelin Gurgun, A (2021) Assessment of readability risks in contracts causing conflicts in construction projects. Journal of Construction Engineering and Management, 147(6): 20202277, ISSN 0733-9364
Kodikara, G W (1990) Data flow in building contractor organisations. PhD thesis, Loughborough University, UK.
Konno, Y (2014) Japanese competitive bid entry qualifications: An examination of public works. Construction Management and Economics, 32(10), pp. 957-967. ISSN 01446193
Kraft, E R (2013) Alternative quality assurance organizations for highway design and construction projects. PhD thesis, University of Colorado at Boulder, USA.
Kraiem, Z M (1988) DISCON: An expert system for construction contract disputes. PhD thesis, University of Colorado at Boulder, USA.
Krone, S J (1991) Decreasing the impact of changes. DSc thesis, George Washington University, USA.
Kuitert, L; Volker, L and Hermans, M H (2019) Taking on a wider view: Public value interests of construction clients in a changing construction industry. Construction Management and Economics, 37(5), pp. 257-277. ISSN 01446193
Kwawu, W and Laryea, S (2013) Incentive contracting in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Kyalisiima, C; Tutesigensi, A and Kayondo, M (2022) Is the competence of internal stakeholders in construction projects an antidote to construction contract disputes? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Lal, H (2013) Nuclear decommissioning contracts: The legal and commercial issues. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(2), pp. 94-102. ISSN 17514304
Laryea, S (2009) Subcontract and supply enquiries in the tender process of contractors. Construction Management and Economics, 27(12), pp. 1219-1230. ISSN 1466433X
Laryea, S (2016) Risk apportionment in target cost contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 248-257. ISSN 17514304
Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.
Lessani, A (2016) Decision analysis in construction claims. PhD thesis, University of Maryland, College Park, USA.
Lewis, S J and Greenwood, D J (2002) The treatment of risk in construction contracts under PFI/PPP. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Li, B (2003) Risk management of construction public private partnership projects. PhD thesis, Glasgow Caledonian University, UK.
Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.
Li, Y C; Luk, W H and Cheng, E (2016) Hong Kong's first public sector NEC contract: Lessons learnt. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 231-237. ISSN 17514304
Lim, E C (1996) The analysis of productivity in building construction. PhD thesis, Loughborough University, UK.
Lim, T (2009) Essence of time in construction contracts. Construction Economics and Building, 9(2), pp. 1-6. ISSN 2204-9029
Lin, M-C (2000) Contract design of private infrastructure concessions. PhD thesis, University of California, Berkeley, USA.
Lind, H and Borg, L (2010) Service-led construction: Is it really the future? Construction Management and Economics, 28(11), pp. 1145-1153. ISSN 1466433X
Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771
Ling, F Y Y and Tran, P Q (2012) Effects of interpersonal relations on public sector construction contracts in Vietnam. Construction Management and Economics, 30(12), pp. 1087-1101. ISSN 1466433X
Liou, F M; Yang, C H; Chen, B and Chen, W (2011) Identifying the Pareto-front approximation for negotiations of BOT contracts with a multi-objective genetic algorithm. Construction Management and Economics, 29(5), pp. 535-548. ISSN 1466433X
Liu, H; Han, S and Zhu, Z (2023) Blockchain technology toward smart construction: Review and future directions. Journal of Construction Engineering and Management, 149(3): 03123002, ISSN 0733-9364
Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X
Liu, M (2013) The application of BIM and IPD in public design and construction. PhD thesis, Polytechnic Institute of New York University, USA.
Liu, S L; Wang, S Y and Lai, K K (2005) A general multivariate analysis approach for determining bid mark-up strategy. Construction Management and Economics, 23(4), pp. 347-353. ISSN 01446193
Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(2), pp. 115-137. ISSN 0969-9988
Loosemore, M (1999) Responsibility, power and construction conflict. Construction Management and Economics, 17(6), pp. 699-709. ISSN 01446193
Loosemore, M and Hughes, K (1998) Emergency systems in construction contracts. Engineering, Construction and Architectural Management, 5(2), pp. 189-198. ISSN 0969-9988
Lord, W E and Gray, T E (2011) Cost benefit analysis approach to global claims. International Journal of Law in the Built Environment, 3(3), pp. 222-236. ISSN 1756-1450
Lowe, D J and Skitmore, M (2007) The learning climate of an organisation and practitioner competence. Journal of Financial Management of Property and Construction, 12(3), pp. 151-164. ISSN 1366-4387
Lowe, D J and Skitmore, R M (2001) Human effects in construction contract price forecasting: Experience and experiential learning styles. Journal of Construction Engineering and Management, 127(6), pp. 485-493. ISSN 0733-9364
Lu, W; Li, Z and Wang, S (2017) The role of justice for cooperation and contract's moderating effect in construction dispute negotiation. Engineering, Construction and Architectural Management, 24(1), pp. 133-153. ISSN 0969-9988
Lu, Y and Zhang, J (2022) Bibliometric analysis and critical review of the research on big data in the construction industry. Engineering, Construction and Architectural Management, 29(9), pp. 3574-3592. ISSN 0969-9988
Luise Valencia Gluyas, J (2004) Public-private participation in water infrastructure in Mexico. PhD thesis, University of Leeds, UK.
Lukhele, T M (2023) A systematic risk management model for construction project management: a case study of the new infrastructure project in the University of Mpumalanga. PhD thesis, Nelson Mandela University, South Africa.
Lundkvist, R (2015) Experience feedback in industrialised house-building: The impact of production strategies. PhD thesis, Luleå University of Technology, Sweden.
Luu, D and Sher, W (2006) Construction tender subcontract selection using case-based reasoning. Construction Economics and Building, 6(2), pp. 32-43. ISSN 2204-9029
Magdub, R H (2006) Application of the lump sum turnkey contracts in Libyan civil law with reference to English law and international practice. PhD thesis, Glasgow Caledonian University, UK.
Mahdi Hosseinian, S; Farahpour, E and Carmichael, D G (2020) Optimum outcome-sharing construction contracts with multiagent and multioutcome arrangements. Journal of Construction Engineering and Management, 146(7): 04020067, ISSN 0733-9364
Mahfouz, T; Davlyatov, S and Kandil, A (2016) Analysis of differing site condition litigation reasoning through statistical modeling. International Journal of Construction Education and Research, 12(4), pp. 285-302. ISSN 1557-8771
Makwiranzou, C (2019) Building trust and managing risk between the client, consultant, and contractor in traditional and relational construction projects. PhD thesis, University of Liverpool, UK.
Mangano, G; Castelblanco, G; De Marco, A and Ottaviani, F M (2025) Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), pp. 193-210. ISSN 2044-124X
Marinelli, M and Salopek, M (2020) Joint risk management and collaborative ethos: Exploratory research in the UK construction sector. Journal of Engineering, Design and Technology, 18(2), pp. 343-361. ISSN 1726-0531
Maritz, M J and Hattingh, V (2015) Electronic communication in the construction industry. Journal of Engineering, Design and Technology, 13(1), pp. 74-93.
Maritz, M J and Putlitz, U (2014) Standard form construction contracts; why the need for regular changes? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Marques, N L; Bastian-Pinto, C D L and Brandão, L E T (2021) Crossing the Brownian Bridge: Valuing infrastructure capacity expansion policies as real options. Construction Management and Economics, 39(3), pp. 261-276. ISSN 01446193
Martin, S D (1981) Building contracts in classical Roman law. PhD thesis, University of Michigan, USA.
Martínez Alonso, Wilfrido (2024) An NLP approach to understand construction long text. PhD thesis, Stanford University, USA.
Marxen, K (2017) Demand guarantees in the construction industry: A comparative legal study of their use and abuse from a South African, English and German perspective. LLD thesis, University of Johannesburg, South Africa.
Marzouk, M and Amin, A (2013) Predicting construction materials prices using fuzzy logic and neural networks. Journal of Construction Engineering and Management, 139(9), pp. 1190-1198. ISSN 0733-9364
Mason, G E (1973) A quantitative risk management approach to the selection of construction contract provisions. PhD thesis, Stanford University, USA.
May, D; Wilson, O and Skitmore, M (2001) Bid cutting: An empirical study of practice in South-East Queensland. Engineering, Construction and Architectural Management, 8(4), pp. 250-256. ISSN 0969-9988
Mbachu, J (2008) Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Construction Management and Economics, 26(5), pp. 471-484. ISSN 1466433X
McCowan, A and Mohamed, S (2002) A classification of decision support systems (DSSs) for the Analysis and evaluation of concession project investments (CPIs). Journal of Financial Management of Property and Construction, 7(2), pp. 127-137. ISSN 1366-4387
McDermott, P and Quinn, B (1995) Latham causes conflict: Institutional development in the UK construction industry. Journal of Construction Procurement, 1(2), pp. 150-164. ISSN 1358-9180
McLernon, T (2014) A study of the management of time by comparing and evaluating the provisions for the management of time in the JCT standard building contract (JCT sbc), the new engineering and construction contract (nec3) and the new complex projects contract 2013 (cpc20. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
McNamara, A J and Sepasgozar, S M E (2020) Developing a theoretical framework for intelligent contract acceptance. Construction Innovation, 20(3), pp. 421-445. ISSN 1471-4175
McNamara, A J; Shirowzhan, S and M.E. Sepasgozar, S (2024) Investigating the determents of intelligent construction contract adoption: A refinement of the technology readiness index to inform an integrated technology acceptance model. Construction Innovation, 24(3), pp. 702-724. ISSN 1471-4175
Meng, X (2002) Guarantees for contractor's performance and owner's payment in China. Journal of Construction Engineering and Management, 128(3), pp. 232-237. ISSN 0733-9364
Merna, A and Smith, N J (1994) Concession contracts for power generation. Engineering, Construction and Architectural Management, 1(1), pp. 17-27. ISSN 0969-9988
Mills, A; Love, P E D and Williams, P (2009) Defect costs in residential construction. Journal of Construction Engineering and Management, 135(1), pp. 12-16. ISSN 0733-9364
Milner, A (2011) Contract interpretation: Potential for relaxing the exclusionary rule. International Journal of Law in the Built Environment, 3(3), pp. 205-221. ISSN 1756-1450
Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.
Mirzadeh, I and Birgisson, B (2016) Evaluation of highway projects under government support mechanisms based on an option-pricing framework. Journal of Construction Engineering and Management, 142(4): 04015094, ISSN 0733-9364
Mokhtari, M and Hosseinian, S M (2025) Optimal outcome sharing among clients, builders, and designers in collaborative construction contracts: Comparing design–bid–build and design–build methods using principal–agent theory. Journal of Construction Engineering and Management, 151(3): 04024212, ISSN 0733-9364
Molenaar, K; Washington, S and Diekmann, J (2000) Structural equation model of construction contract dispute potential. Journal of Construction Engineering and Management, 126(4), pp. 268-276. ISSN 0733-9364
Montague, A M (2017) Investigating women entrepreneurs in construction and their sense of belonging in a male dominated industry: A multiple-case study. DBA thesis, Northcentral University, USA.
Mooney, C and Mooney, E (2014) Risk allocation in construction contracts: Irish public works. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 68-74. ISSN 17514304
Moore, S (2020) RICS professional education and training for quantity surveyors and the extent to which it is relevant in the current UK built environment market. DProf thesis, University of Salford, UK.
Morrison, S and Trushell, I (2016) Payment for offsite goods and materials: The Scottish perspective. Construction Management and Economics, 34(10), pp. 679-687. ISSN 0144-6193
Motawa, I A; Khosrowshahi, F and Kaka, A P (2005) Development and evaluation of a company-level budgeting technique incorporating future construction contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Motiar Rahman, M and Kumaraswamy, M M (2002) Risk management trends in the construction industry: Moving towards joint risk management. Engineering, Construction and Architectural Management, 9(2), pp. 131-151. ISSN 0969-9988
Moza, A and Paul, V K (2019) Analysis of claims in public works construction contracts in India. Journal of Construction in Developing Countries, 23(2), pp. 7-26. ISSN 1823-6499
Munaif, M A (1995) Multiple criteria decision-making in contractor selection and evaluation of construction bids in Saudi Arabia. PhD thesis, University of Missouri - Rolla, USA.
Mundonde, J (2022) Framework model for financing sustainable water and sanitation infrastructure in Zimbabwe. PhD thesis, University of South Africa, South Africa.
Murphy, M and Eadie, R (2019) Socially responsible procurement: A service innovation for generating employment in construction. Built Environment Project and Asset Management, 9(1), pp. 138-152. ISSN 2044-124X
Nassar, K (2003) Construction contracts in a competitive market: C3M, a simulation game. Engineering, Construction and Architectural Management, 10(3), pp. 172-178. ISSN 0969-9988
Nathan, K V S K (1994) Submission to ICSID in breach of the convention: disputes in international civil engineering contracts. PhD thesis, Queen Mary University of London, UK.
Ndekugri, I (2016) Late disputes and the NEC3 Engineering and Construction Contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 65-76. ISSN 17514304
Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: A FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(2), pp. 177-187. ISSN 0969-9988
Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(4), pp. 399-408. ISSN 01446193
Ndekugri, I; Silverio, A K and Mason, J (2024) Enforcing payment obligations under construction contracts by insolvency proceedings. Journal of Financial Management of Property and Construction, 29(3), pp. 372-387. ISSN 1366-4387
Ndekugri, I E (1986) Construction contract information management: an integrated systems approach. PhD thesis, Loughborough University, UK.
Neale, R H and Light, L F (1982) A comparison of the reimbursement provided by the Series 1 and Series 2 NEDO formulae for thirteen building projects. Construction Papers, 1(3), pp. 21-25. ISSN 0144-8587
Ng, A K W and Price, A D F (2010) Optimizing the time performance of subcontractors in building projects. Construction Economics and Building, 10(1-2), pp. 90-102. ISSN 2204-9029
Ng, C-W V (2007) Managing power, conflict and change: an analytical model for construction contract procurement. PhD thesis, University of Hong Kong, Hong Kong.
Ng, S T and Xie, J (2008) A simulation model for evaluating the tariff stability of concession-based PPP proposals. Construction Innovation, 8(2), pp. 106-119. ISSN 1471-4175
Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.
Nielsen, L-H K; Akanmu, A and Anumba, C J (2015) Comparative analysis of back-to-back subcontracts in the construction and telecommunications industries. Built Environment Project and Asset Management, 5(4), pp. 446-460. ISSN 2044-124X
Ninos, G E (1983) Control of construction contracts: analysis of systems for the control of progress, quality and cost of construction to the client, based upon six cases in building or civil engineering in the UK. PhD thesis, University of Bradford, UK.
Niu, J (2014) Ontology-based semantic interpretation framework for legal analysis of construction claims. PhD thesis, University of Florida, USA.
Noakes, J D (2005) Under the radar: Defence Construction (1951) Limited and military infrastructure in Canada, 1950–1965. PhD thesis, Carleton University, Canada.
Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.
Noruwa, B I; Arewa, A O and Merschbrock, C (2022) Effects of emerging technologies in minimising variations in construction projects in the UK. International Journal of Construction Management, 22(11), pp. 2199-2206. ISSN 1562-3599
Ntiyakunze, S K (2011) Conflicts in building projets in Tanzania: Analysis of causes and management approaches. PhD thesis, KTH Royal Institute of Technology, Sweden.
Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.
Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599
Ojo, A E and Akinradewo, F O (2011) Essentials in arbitration clause for construction contract dispute resolution in Nigeria. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Okudan, O; Demirdöğen, G and Işık, Z (2025) A decision-support framework for suspension of public infrastructure projects: A combined use of neutrosophic AHP and TOPSIS. Engineering, Construction and Architectural Management, 32(5), pp. 3187-3216. ISSN 0969-9988
Oladimeji, O and Haddad, A N (2025) Corruption and factors influencing the viability of micro, small and medium scale construction firms (msmcfs). Journal of Financial Management of Property and Construction, 30(3), pp. 477-499. ISSN 1366-4387
Olatunde, N A; Awodele, I A and Adebayo, B O (2022) Impact of COVID-19 pandemic on indigenous contractors in a developing economy. Journal of Engineering, Design and Technology, 20(1), pp. 267-280. ISSN 1726-0531
Oo, B L and Tang, O S (2023) Information feedback in construction contract bidding: Perceptions of Hong Kong contractors. International Journal of Construction Management, 23(6), pp. 1044-1052. ISSN 1562-3599
Opawole, A (2018) Penalty mechanisms for enforcing concessionaire performance in public-private partnership contracts in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 161-191.
Opawole, A and Jagboro, G O (2017) Factors affecting the performance of private party in concession-based PPP projects in Nigeria. Journal of Engineering, Design and Technology, 15(1), pp. 44-57.
Opawole, A and Jagboro, G O (2018) Compensation mechanisms for minimizing private party risks in concession-based public-private partnership contracts. International Journal of Building Pathology and Adaptation, 36(1), pp. 93-120. ISSN 23984708
Orsaah, S (1984) Perception and management of risk in the construction industry. PhD thesis, University of Strathclyde, UK.
Othman, N (1997) Management of variations in construction contracts. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Otim, M A; Kyalisiima, C; Tutesigensi, A; Mutikanga, H E and Kayondo, M (2023) Avoiding disputes through effective procurement in large construction projects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Otim, M A; Tutesigensi, A and Mutikanga, H E (2022) Can professionalism make contract disputes in infrastructure projects disappear? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Oztas, A (1995) The mitigation of the effects of delays in construction projects: A knowledge based system approach. PhD thesis, University of Manchester, UK.
Pain, J and Bennett, J (1988) JCT with contractor's design form of contract: A study in use. Construction Management and Economics, 6(4), pp. 307-337. ISSN 01446193
Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.
Patsiadas, P and Angelides, D C (2008) Legislative frameworks for port concessions in Greece. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 157-162. ISSN 17514312
Patterson, R L and Trebes, B (2013) NEC contracts for design-build-operate contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(5), pp. 260-268. ISSN 17514312
Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.
Persad, K R (1989) Management of the preconstruction process for highway projects using manpower demand prediction models. PhD thesis, University of Texas at Austin, USA.
Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.
Porter, C E (1981) Risk allocation in construction contracts. PhD thesis, University of Manchester, UK.
Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.
Premaratne, A S; Feng, Z and Yiu, T W (2022) Independence and impartiality of contract administrators in the New Zealand construction sector. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(2), pp. 76-84. ISSN 17514304
Priest, P (2024) From compliance to care: Shaping modern slavery competency in architectural professional practice. PhD thesis, Royal College of Art, UK.
Prinsloo, H F (2016) Toward a decision framework for the analysis of construction claims. PhD thesis, University of Pretoria, South Africa.
Priven, V and Sacks, R (2016) Impacts of the social subcontract and last planner system interventions on the trade-crew workflows of multistory residential construction projects. Journal of Construction Engineering and Management, 142(7): 4016013, ISSN 0733-9364
Pryke, S and Pearson, S (2006) Project governance: Case studies on financial incentives. Building Research & Information, 34(6), pp. 534-545. ISSN 0961-3218
Pulket, T and Arditi, D (2009) Construction litigation prediction system using ant colony optimization. Construction Management and Economics, 27(3), pp. 241-251. ISSN 1466433X
Qian, Q K; Fan, K and Chan, E H W (2016) Regulatory incentives for green buildings: Gross floor area concessions. Building Research & Information, 44(5-6), pp. 675-693. ISSN 0961-3218
Ragab, M A and Marzouk, M (2021) BIM adoption in construction contracts: Content analysis approach. Journal of Construction Engineering and Management, 147(8): 0002123, ISSN 0733-9364
Rahman, A and Sainati, T (2021) Adapting standard forms of contract to facilitate building information modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(3), pp. 110-118. ISSN 17514304
Raina, P (2015) An examination of the retention practice in the New Zealand construction industry. PhD thesis, Auckland University of Technology, New Zealand.
Raj, S; Hillig, J B and Hughes, W P (2009) Responsiveness to change by standard-form contract drafters in the construction industry: A case study of the FIDIC white book. International Journal of Law in the Built Environment, 1(3), pp. 205-220. ISSN 1756-1450
Ramabodu, M S (2013) Rules of tendering and the influence of the privilege clause in South Africa. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Ramachandra, T (2013) Exploring feasible solutions to payment problems in the construction industry in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Ramani, P V and Akomah, B B (2025) The negative factors that influence the performance of Ghanaian construction projects. Construction Economics and Building, 25(2), pp. 112-142. ISSN 2204-9029
Rameezdeen, R and Rajapakse, C (2007) Contract interpretation: The impact of readability. Construction Management and Economics, 25(7), pp. 729-737. ISSN 1466433X
Rameezdeen, R and Rodrigo, A (2013) Textual complexity of standard conditions used in the construction industry. Construction Economics and Building, 13(1), pp. 1-12. ISSN 2204-9029
Rameezdeen, R and Rodrigo, A (2014) Modifications to standard forms of contract: The impact on readability. Construction Economics and Building, 14(2), pp. 31-40. ISSN 2204-9029
Raynar, K A (1994) Integrating computer vision with computer aided design to produce construction as-built drawings. PhD thesis, Pennsylvania State University, USA.
Reid, S and Loosemore, M (2017) Motivations and barriers to social procurement in the Australian construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Reynolds, M F (1990) Facilities planning and construction internship. DEng thesis, Texas A&M University, USA.
Rich, D (2014) On-site application of self-compacting concrete. EngD thesis, Loughborough University, UK.
Roehrich, J K and Lewis, M A (2010) Towards a model of governance in complex (product-service) inter-organizational systems. Construction Management and Economics, 28(11), pp. 1155-1164. ISSN 1466433X
Rohman, M A (2022) Assessment of the government's role performance in public-private partnership (PPP) toll road projects in Indonesia. Journal of Financial Management of Property and Construction, 27(2), pp. 239-258. ISSN 1366-4387
Root, D S (2001) The influence of professional and occupational cultures on project relationships mediated through standard forms and conditions of contract. PhD thesis, University of Bath, UK.
Rose, T and Manley, K (2010) Client recommendations for financial incentives on construction projects. Engineering, Construction and Architectural Management, 17(3), pp. 252-267. ISSN 0969-9988
Ross, A and Goulding, J (2007) Supply chain transactional barriers to design cost management. Construction Innovation, 7(3), pp. 274-287. ISSN 1471-4175
Russell, J S (1992) Decision models for analysis and evaluation of construction contractors. Construction Management and Economics, 10(3), pp. 185-202. ISSN 01446193
Russell, J S; Hancher, D E and Skibniewski, M J (1992) Contractor prequalification data for construction owners. Construction Management and Economics, 10(2), pp. 117-135. ISSN 01446193
Ryan, C.; Spillane, J. P. and Bradley, J. G. (2025) The jurisdiction of adjudicators under the construction contracts act 2013: A case review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 7-15. ISSN 1751-4304
Ryan, C; Spillane, J P and Bradley, J G (2023) Legal issues facing adjudication in the Irish construction industry: A discussion. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Ryan, C; Spillane, J P and Bradley, J G (2024) Barriers to the adoption of alternative dispute resolution within the Irish construction industry: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Ryan, E C (1998) Devising contract terms in construction contracts to produce efficient performance. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Ryan, E C (2001) An economic analysis of the standard construction contract. PhD thesis, King's College London, UK.
S. Shehata, A.; M. El-Kelesh, A. and El-Kasaby, E. S. (2026) Effects of ground conditions on utilization factor of slurry tbms in soft ground tunneling. Engineering, Construction and Architectural Management, 33(7), pp. 5275-5299. ISSN 0969-9988
Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218
Sadek, S M A (2016) Managing standard construction contractual forms modifications in the Middle East: overview and recommendations. PhD thesis, University of Salford, UK.
Sadullah, M; Ghazali, M and Rashid, A (2018) Critical success factors in a public–private partnership highway project in Malaysia: Ampang–Kuala Lumpur elevated highway. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 234-242. ISSN 17514304
Safa, M; Shahi, A; Haas, C T and Hipel, K W (2017) Construction contract management using value packaging systems. International Journal of Construction Management, 17(1), pp. 50-64. ISSN 1562-3599
Sami Ur Rehman, M; Shafiq, M T and Afzal, M (2022) Impact of COVID-19 on project performance in the UAE construction industry. Journal of Engineering, Design and Technology, 20(1), pp. 245-266. ISSN 1726-0531
Sami Ur Rehman, M; Shafiq, M T; Ullah, F and Galal Ahmed, K (2023) A critical appraisal of traditional methods of construction progress monitoring. Built Environment Project and Asset Management, 13(6), pp. 830-845. ISSN 2044-124X
Samuels, A F and Bruder, M J (1996) Construction representative: Scheduling and cost management. Journal of Construction Engineering and Management, 122(3), pp. 281-290. ISSN 0733-9364
Schlick, H (1983) Temporary heating in construction contracts. Journal of Construction Engineering and Management, 109(4), pp. 447-459. ISSN 0733-9364
Scott, S and Harris, R A (2004) United Kingdom construction claims: Views of professionals. Journal of Construction Engineering and Management, 130(5), pp. 734-741. ISSN 0733-9364
Semple, C; Hartman, F T and Jergeas, G (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), pp. 785-795. ISSN 0733-9364
Seneviratne, K and Michael, G V (2020) Disputes in time bar provisions for contractors' claims in standard form of contracts. International Journal of Construction Management, 20(4), pp. 335-346. ISSN 1562-3599
Sertyeşilışık, B (2007) An investigation on the application of standard contracts in the Turkish construction industry. PhD thesis, Middle East Technical University, Turkey.
Severson, G D; Jaselskis, E J and Russell, J S (1993) Trends in construction contractor financial data. Journal of Construction Engineering and Management, 119(4), pp. 854-858. ISSN 0733-9364
Shafabakhsh, G A; Kashi, E and Akbari, A (2016) A comparison effect of aircraft main gear configuration on runway damages by led and fe method. Journal of Engineering, Design and Technology, 14(2), pp. 362-372.
Shan, L; Garvin, M J and Kumar, R (2010) Collar options to manage revenue risks in real toll public-private partnership transportation projects. Construction Management and Economics, 28(10), pp. 1057-1069. ISSN 1466433X
Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms. PhD thesis, University of Washington, USA.
Shen, L; Drew, D and Zhang, Z (1999) Optimal bid model for price-time biparameter construction contracts. Journal of Construction Engineering and Management, 125(3), pp. 204-209. ISSN 0733-9364
Shen, L Y; Li, Q M; Drew, D and Shen, Q P (2004) Awarding construction contracts on multicriteria basis in China. Journal of Construction Engineering and Management, 130(3), pp. 385-393. ISSN 0733-9364
Sherif, E and Kaka, A (2003) Factors influencing the selection of payment systems in construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Shi, L; Wang, Y and Onishi, M (2024) Tie-formation mechanisms in evolving networks of sponsors in highway public-private partnerships. Journal of Construction Engineering and Management, 150(10): 04024128, ISSN 0733-9364
Short, C A; Cook, M and Lomas, K J (2009) Delivery and performance of a low-energy ventilation and cooling strategy. Building Research & Information, 37(1), pp. 1-30. ISSN 0961-3218
Shrestha, K K (2016) Causes of change orders and its impact on road maintenance contracts. PhD thesis, University of Nevada, Las Vegas, USA.
Sidwell, A C; Budiawan, D and ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(2), pp. 107-116. ISSN 1471-4175
Sinha, A K and Jha, K N (2021) Financing constraints of public-private partnership projects in India. Engineering, Construction and Architectural Management, 28(1), pp. 246-269. ISSN 0969-9988
Skaik, Samer Hisham (2017) Introducing review mechanisms into statutory construction adjudication. PhD thesis, Deakin University, Australia.
Skinner, D W H (1979) An analysis of the utility of bills of quantities in the process of building contracting. PhD thesis, Aston University, UK.
Skitmore, M (1991) The construction contract bidder homogeneity assumption: An empirical test. Construction Management and Economics, 9(5), pp. 403-429. ISSN 01446193
Skitmore, M (2001) Raftery curves for tender price forecasting: Empirical probabilities and pooling. Journal of Financial Management of Property and Construction, 6(3), pp. 141-154. ISSN 1366-4387
Skitmore, M (2004) Predicting the probability of winning sealed bid auctions: The effects of outliers on bidding models. Construction Management and Economics, 22(1), pp. 101-109. ISSN 01446193
Skitmore, M (2008) First and second price independent values sealed bid procurement auctions: Some scalar equilibrium results. Construction Management and Economics, 26(8), pp. 785-801. ISSN 1466433X
Skitmore, M and Lo, H P (2002) A method for identifying high outliers in construction contract auctions. Engineering, Construction and Architectural Management, 9(2), pp. 90-130. ISSN 0969-9988
Skitmore, R M; Pettitt, A N and McVinish, R (2007) Gates' bidding model. Journal of Construction Engineering and Management, 133(11), pp. 855-863. ISSN 0733-9364
Small, E P; Bakry, I and Ayyash, L (2021) Evaluating the effect of TQM on mep construction productivity and project delivery in Dubai. International Journal of Construction Management, 21(10), pp. 1061-1075. ISSN 1562-3599
Smith, D (2020) Rank and file union organising and employers' counter-mobilisation: The role of activists in the mobilisation of 'self-employed' construction workers. PhD thesis, University of the West of England, Bristol, UK.
Smith, G R and Bohn, C M (1999) Small to medium contractor contingency and assumption of risk. Journal of Construction Engineering and Management, 125(2), pp. 101-108. ISSN 0733-9364
Smith, N J (1986) The study of criticality: An investigation based on network theory into the relationship between time and cost in civil engineering bridgeworks contracts and the measurement of the effects of change. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Soo, A and Oo, B L (2014) The effect of construction demand on contract auctions: An experiment. Engineering, Construction and Architectural Management, 21(3), pp. 276-290. ISSN 0969-9988
Sparkling, A E (2018) Collaborative project delivery practices, goal alignment, and performance in architecture, engineering, and construction project teams. PhD thesis, Michigan State University, USA.
Spencer, C A (2024) The contract, the contractor, and the capitalization of American building. PhD thesis, Massachusetts Institute of Technology, USA.
Stanford, M S (2017) Competition and price analysis of indefinite delivery indefinite quantity contracts for construction. PhD thesis, University of Colorado at Boulder, USA.
Starzyk, G F (2014) Alliance contracting: Enforceability of the consensusdocs 300 mutual waiver of liability in us courts. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Sturges, J and Bates, M (2000) Thriving on chaos: The result of poor planning: Some views from the housebuilding sector. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity. PhD thesis, University of Wisconsin - Madison, USA.
Sun, Y and Zhang, L (2015) Balancing public and private stakeholder interests in BOT concessions: Minimum revenue guarantee and royalty scheme applied to a water treatment project in China. Journal of Construction Engineering and Management, 141(2): 04014070, ISSN 0733-9364
Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing. PhD thesis, Indian Institute of Technology Delhi, India.
Sutrisna, M and Potts, K (2002) Analysing typical factors for the early prediction of variations. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Taiwo, D O (2022) Incremental development of a legal framework for arbitration in emerging markets: A case study of construction arbitration in Nigeria. PhD thesis, University of Essex, UK.
Tajul Ariffin H L and Sutrisna, M (2010) Developing a framework to minimize the occurrence of construction conflict and disputes in different procurement strategies: An initial review of literature. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Tang, S L; Lee, H K and Wong, K (1997) Safety cost optimization of building projects in Hong Kong. Construction Management and Economics, 15(2), pp. 177-186. ISSN 01446193
Tavakoli, A and Tulumen, S C (1990) Construction industry in Turkey. Construction Management and Economics, 8(1), pp. 77-87. ISSN 01446193
Tavakoli, N and Hosseini Nourzad, S H (2020) Win-win pricing method for BOT projects using a simulation-based evolutionary optimization. Construction Management and Economics, 38(2), pp. 157-171. ISSN 01446193
Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Thal Jr, A E; Cook, J J and White Iii, E D (2010) Estimation of cost contingency for Air Force construction projects. Journal of Construction Engineering and Management, 136(11), pp. 1181-1188. ISSN 0733-9364
Thiel, D J (2005) Builders: the social organisation of a construction site. PhD thesis, London School of Economics and Political Science, UK.
Thomas, C S (1994) Aspects of building contracts: A comparative view of english and french law in the light of potential harmonisation. PhD thesis, King's College London, UK.
Thomas, H R; Smith, G R and Mellott, R E (1994) Interpretation of construction contracts. Journal of Construction Engineering and Management, 120(2), pp. 321-336. ISSN 0733-9364
Thomas, H R; Smith, G R and Ponderlick, R M (1992) Resolving contract disputes based on misrepresentations. Journal of Construction Engineering and Management, 118(3), pp. 472-487. ISSN 0733-9364
Thorpe, A; Dainty, A R J and Hatfield, H (2003) The realities of being preferred: Specialist subcontractor perspectives on restricted tender list membership. Journal of Construction Procurement, 9(1), pp. 47-55. ISSN 1358-9180
Tiew, S Y (2025) A construction contract administration (cca) framework for graduate architects' professional development. Engineering, Construction and Architectural Management, 32(12), pp. 8056-8072. ISSN 0969-9988
Tiew, S Y (2025) Improving professional development through building contract administration (bca) framework of housing projects for graduate architects. Engineering, Construction and Architectural Management, 32(8), pp. 5272-5290. ISSN 0969-9988
Tiew, S Y (2025) Performance barriers and competence development of graduate architects in construction contract administration (cca): The mediating role of cca skills. Engineering, Construction and Architectural Management, 32(8), pp. 5609-5637. ISSN 0969-9988
Tiew, S Y; Aman Hashim, H and Zolkafli @ Zulkifly, U K (2025) Factors influencing the effectiveness of graduate architects as construction contract administrators (cca). Engineering, Construction and Architectural Management, 32(1), pp. 332-348. ISSN 0969-9988
Tiew, S Y; Hashim, H A and Zolkafli, U K B (2022) Performance barriers in relation with professional development of graduate architects in construction industry: A systematic literature review. Journal of Construction Business and Management, 5(2), pp. 29-43. ISSN 2521-0165
Tiong, R L K (1992) Strategies in risk management of on-demand guarantees. Journal of Construction Engineering and Management, 118(2), pp. 229-243. ISSN 0733-9364
Tiwari, A; Singh, S; Routroy, S; Gopinath, A and Sahu, P K (2025) Analysing critical risk factors of Indian road construction projects: a fuzzy DEMATEL approach. International Journal of Construction Management, 25(4), pp. 469-480. ISSN 1562-3599
Touran, A; Atgun, M and Bhurisith, I (2004) Analysis of the United States department of transportation prompt pay provisions. Journal of Construction Engineering and Management, 130(5), pp. 719-725. ISSN 0733-9364
Trushell, I (2016) Everything's coming up (silk) roses. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Trushell, I; Clark, B and Agapiou, A (2016) Construction mediation in Scotland: An investigation into attitudes and experiences of mediation practitioners. International Journal of Law in the Built Environment, 8(2), pp. 101-122. ISSN 1756-1450
Tufte, E A (1986) Construction project resource management system. PhD thesis, North Dakota State University, USA.
Twyford, J W (2007) Additional payments under construction contracts. Construction Management and Economics, 25(7), pp. 739-745. ISSN 1466433X
Uher, T and Brand, M (2007) A comparative analysis of the operation of 'compulsory rapid adjudication' in New South Wales and New Zealand. Construction Management and Economics, 25(7), pp. 765-775. ISSN 1466433X
Uher, T E (1991) Risks in subcontracting: Subcontract conditions. Construction Management and Economics, 9(6), pp. 495-508. ISSN 01446193
Uher, T E and Brand, M C (2008) Claimants' view of the performance of adjudication in New South Wales. Engineering, Construction and Architectural Management, 15(5), pp. 470-484. ISSN 0969-9988
Uher, Thomas Edward (1990) The effect of risks and uncertainties on subcontract bid prices. Unpublished PhD thesis, University of New South Wales, Australia.
Un, B; Erdiş, E; Aydınlı, S; Genç, O and Alboga, O (2025) Forecasting the outcomes of construction contract disputes using machine learning techniques. Engineering, Construction and Architectural Management, 32(10), pp. 6421-6444. ISSN 0969-9988
Verma, M (2012) Public private partnerships in road transport infrastructure in India: A governance perspective. PhD thesis, University of Manchester, UK.
Vidogah, W (1997) Claims on construction contracts: a new management framework. PhD thesis, University of Wolverhampton, UK.
Waara, F (2008) Mitigating contractual hazards in public procurement: A study of Swedish local authorities. Construction Management and Economics, 26(2), pp. 137-145. ISSN 1466433X
Waara, F and Bröchner, J (2006) Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management, 132(8), pp. 797-804. ISSN 0733-9364
Wah, T K (2018) Legal analysis of construction defect claims within common law jurisdictions for Malaysia. PhD thesis, University of Malaya, Malaysia.
Wahab, A (2024) Integrating building information modeling (BIM) and blockchain technology in the pre-construction planning processes. PhD thesis, Mississippi State University, USA.
Wang, J; Xu, Y; Fang, D and Liao, P C (2025) How project-based learning improves construction contract management training: Evidence from eye-tracking searching strategies for contract risk recognition performance. Journal of Construction Engineering and Management, 151(9): 04025125, ISSN 0733-9364
Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Foreign exchange and revenue risks: Analysis of key contract clauses in China's BOT project. Construction Management and Economics, 18(3), pp. 311-320. ISSN 01446193
Wang, S Q; Tiong, R L K; Ting, S K; Chew, D and Ashley, D (1998) Evaluation and competitive tendering of BOT power plant project in China. Journal of Construction Engineering and Management, 124(4), pp. 333-341. ISSN 0733-9364
Wang, W C (2004) Electronic-based procedure for managing unbalanced bids. Journal of Construction Engineering and Management, 130(3), pp. 455-460. ISSN 0733-9364
Wang, Y (1998) An analysis of the technical efficiency in Hong Kong's construction industry. PhD thesis, University of Hong Kong, Hong Kong.
Ward, P (2005) The socl's delay and disruption protocol and the Australian construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ward, P (2011) A UK and Australian perspective of the suitability of the scl protocols' provisions for dealing with float for adoption and use by the Australian construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ward, P and Jefferies, M (2014) Are Australian standard forms of construction contract capable of dealing with the issue of extensions of time efficiently and effectively? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ward, P; Sher, W; Gameson, R and Aranda-Mena, G (2007) Innovative protocols and technologies as a means of complying with the building and construction industry security of payments act 1999 (NSW) Australia. Construction Management and Economics, 25(7), pp. 747-763. ISSN 1466433X
Waziri, B S (2018) Pareto analysis of critical risk factors of build operate and transfer projects in Nigeria. Journal of Construction Business and Management, 2(1), pp. 33-40. ISSN 2521-0165
Wessels, M (2014) Stimulating sustainable infrastructure development through public-private partnerships. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 232-241. ISSN 17514304
Whaley, A (2016) Why claims fail: An autoethnographic investigation of claims management under gcc construction contracts. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Whaley, A; McAdam, B and Crowe, P (2015) The acceleration dilemma: Can English law accommodate constructive acceleration? International Journal of Law in the Built Environment, 7(3), pp. 248-267. ISSN 1756-1450
White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193
White, N J (2006) Destruction of the contract through material changes. International Journal of Construction Education and Research, 2(1), pp. 43-51. ISSN 1557-8771
Whiteman, D E (2002) The application of total quality management in construction field operations. PhD thesis, University of Florida, USA.
Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.
Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wiguna, I P A and Scott, S (2006) Relating risk to project performance in Indonesian building contracts. Construction Management and Economics, 24(11), pp. 1125-1135. ISSN 1466433X
Williams, G A (1992) Contract as organisation: an economic analysis of the Joint Contracts Tribunal's Standard Form of Building contract 1980. PhD thesis, University of Newcastle upon Tyne, UK.
Wilson, N C (1978) Responsibility for building construction (with particular reference to a standard form of building contract as published for the Joint Contracts Tribunal). PhD thesis, University of Leeds, UK.
Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.
Wong, K. K. W.; Chan, J. H. L. and Ng, T. S. T. (2025) KPIs for engineering and construction contract of new engineering contract in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 29-40. ISSN 1751-4304
Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Xiong, W and Zhang, X (2014) Concession renegotiation models for projects developed through public-private partnerships. Journal of Construction Engineering and Management, 140(5): 04014008, ISSN 0733-9364
Xiong, W; Zhang, X and Chen, H (2016) Early-termination compensation in public-private partnership projects. Journal of Construction Engineering and Management, 142(4): 04015098, ISSN 0733-9364
Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364
Yamaguchi, Hiroaki (2002) Risk allocation in privately financed projects. PhD thesis, University of New South Wales, Australia.
Yao, H; Chen, Y; Chen, Y and Zhu, X (2019) Mediating role of risk perception of trust and contract enforcement in the construction industry. Journal of Construction Engineering and Management, 145(2): 4018130, ISSN 0733-9364
Ye, K; Yaoliang, Z; Zhenhua, H and Bingzhen, L (2026) Collusive bidding in the construction industry: A systematic review of organizational forms, mechanisms and anti-collusion strategies. Building Research & Information, 54(3), pp. 378-392. ISSN 0961-3218
Ye, S and Tiong, R L K (2003) The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics, 21(5), pp. 471-482. ISSN 01446193
Ye, S and Tiong, R L K (2004) Public-private partnership for power projects: A case study of Hub power project. Journal of Financial Management of Property and Construction, 9(3), pp. 129-140. ISSN 1366-4387
Yee, Tiew Si (2024) Developing a building contract administration framework for graduate architects managing housing projects. PhD thesis, University of Malaya, Malaysia.
Yeung, J F Y; Chan, D W M; Chan, J H L and Lok, K L (2023) Development of a composite project performance index for the New Engineering Contract (necppi) of construction projects in Hong Kong: A Delphi study. International Journal of Construction Management, 23(16), pp. 2804-2817. ISSN 1562-3599
Yousif, O and Zakaria, R (2022) A framework for integrating green highway performance data with the carbon footprint calculator in Malaysia. Construction Economics and Building, 22(2), pp. 102-120. ISSN 2204-9029
Yu, Dongwen (2025) Last call for impartiality: The role of the contract administrator in construction contracts. PhD thesis, University of Manchester, UK.
Yu, H; Deng, X and Zhang, N (2025) To what extent can smart contracts replace traditional contracts in construction project? Engineering, Construction and Architectural Management, 32(3), pp. 1393-1410. ISSN 0969-9988
Yung, P and Rafferty, K (2015) Statutory adjudication in Western Australia: Adjudicators' views. Engineering, Construction and Architectural Management, 22(1), pp. 54-72. ISSN 0969-9988
Zaghloul, R S (2005) Risk allocation in contracts: How to improve the process. PhD thesis, University of Calgary, Canada.
Zeitoun, A A (1992) Evaluation of cost and schedule growth trends during construction. PhD thesis, Oklahoma State University, USA.
Zhang, S; Li, J; Li, Y and Zhang, X (2021) Revenue risk allocation mechanism in public-private partnership projects: Swing option approach. Journal of Construction Engineering and Management, 147(1): 04020153, ISSN 0733-9364
Zhang, X (2004) Concessionaire selection: Methods and criteria. Journal of Construction Engineering and Management, 130(2), pp. 235-244. ISSN 0733-9364
Zhang, X (2004) Improving concessionaire selection protocols in public/ private partnered infrastructure projects. Journal of Construction Engineering and Management, 130(5), pp. 670-679. ISSN 0733-9364
Zhang, X (2005) Concessionaire's financial capability in developing build-operate-transfer type infrastructure projects. Journal of Construction Engineering and Management, 131(10), pp. 1054-1064. ISSN 0733-9364
Zhang, X (2006) Toward innovative and efficient infrastructure delivery. PhD thesis, University of Alberta, Canada.
Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364
Zhang, X; Liu, T; Rahman, A and Zhou, L (2023) Blockchain applications for construction contract management: A systematic literature review. Journal of Construction Engineering and Management, 149(1): 03122011, ISSN 0733-9364
Zhang, X Q and Kumaraswamy, M M (2000) Choosing concessionaires in BOT-type projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Zhang, X Q; Kumaraswamy, M M; Zheng, W and Palaneeswaran, E (2002) Concessionaire selection for build-operate-transfer tunnel projects in Hong Kong. Journal of Construction Engineering and Management, 128(2), pp. 155-163. ISSN 0733-9364
Zhao, F.; Shi, S. and Fu, X. (2026) Research on decision-making of project financing models based on tri-reference point theory: Evidence from public-private partnerships (PPPs) in China. Engineering, Construction and Architectural Management, 27(5), pp. 1-28. ISSN 0969-9988
Zhong, B; Shen, L; Pan, X; Zhong, X and He, W (2024) Dispute classification and analysis: Deep learning-based text mining for construction contract management. Journal of Construction Engineering and Management, 150(1): 04023151, ISSN 0733-9364
Zhou, H; Zhou, L; Gao, B; Huang, W; Huang, W; Zuo, J and Zhao, X (2025) Intelligent identification of risks in construction contract clauses based on semantic reasoning. Engineering, Construction and Architectural Management, 32(10), pp. 6593-6626. ISSN 0969-9988
Zhou, H; Gao, B; Tang, S; Li, B and Wang, S (2025) Intelligent detection on construction project contract missing clauses based on deep learning and NLP. Engineering, Construction and Architectural Management, 32(3), pp. 1546-1580. ISSN 0969-9988
Zhu, L and Cheung, S O (2022) Equity gap in construction contracting: Identification and ramifications. Engineering, Construction and Architectural Management, 29(1), pp. 262-286. ISSN 0969-9988
Zwick, D C and Miller, K R (2004) Project buyout. Journal of Construction Engineering and Management, 130(2), pp. 245-248. ISSN 0733-9364
de Leeuw, C P (1988) The pre-estimation of compensation payable in accordance with the contract price adjustment provisions of the building industry advisory council. DSc thesis, University of Pretoria, South Africa.
Up a level