Abdel-Galil, E; Ibrahim, A H and Alborkan, A (2022) Assessment of transaction costs for construction projects. International Journal of Construction Management, 22(9), pp. 1618-1631. ISSN 1562-3599

Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364

Ade, R; Rehm, M and Vishnupriya, V (2024) A wintertime thermal analysis of New Zealand Homestar certified apartments for older people. Building Research & Information, 52(6), pp. 680-692. ISSN 0961-3218

Agyekum-Mensah, G (2019) The degree of accuracy and factors that influence the uncertainty of SME cost estimates. International Journal of Construction Management, 19(5), pp. 413-426. ISSN 1562-3599

Aiyetan, A O and Das, D K (2023) Use of drones for construction in developing countries: Barriers and strategic interventions. International Journal of Construction Management, 23(16), pp. 2888-2897. ISSN 1562-3599

Ajani, A A and Olapade, D T (2025) Building design considerations for healthy and active aging-in-place. International Journal of Building Pathology and Adaptation, 43(6), pp. 1466-1481. ISSN 2398-4708

Akbiyikli, R (2005) The holistic realisation of PFI road project objectives in the UK. PhD thesis, University of Salford, UK.

Akeremale, I D (2022) Supply chain management in prefabricated housing construction in Nigeria. PhD thesis, University of Newcastle, Australia.

Al-Azemi, K (2012) Risk management for build, operate and transfer projects within Kuwait. PhD thesis, Loughborough University, UK.

Al-Meshekeh, H S S (1991) The relationship between conflict management style and construction project effectiveness. PhD thesis, University of Strathclyde, UK.

Al-Sudairi, A A and Al-Motairi, M S (2010) Multi objective land use allocation model using priority-based goal programming technique. Construction Management and Economics, 28(2), pp. 151-161. ISSN 1466433X

Alamri, R (2019) Development of a model for health and safety management in Saudi Arabian oil and gas construction projects. PhD thesis, University of Wolverhampton, UK.

Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988

Algarni, A M; Arditi, D and Polat, G (2007) Build-operate-transfer in infrastructure projects in the United States. Journal of Construction Engineering and Management, 133(10), pp. 728-735. ISSN 0733-9364

Alnaseem, N (2022) Private equity infrastructure investment in emerging economies. PhD thesis, Ulster University, UK.

Alongi, A; Angelotti, A; Rizzo, A and Zanelli, A (2021) Measuring the thermal resistance of double and triple layer pneumatic cushions for textile architectures. Architectural Engineering and Design Management, 17(3-4), pp. 334-346. ISSN 1745-2007

Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships. PhD thesis, George Washington University, USA.

Alwasel, A; Abdel-Rahman, E M; Haas, C T and Lee, S (2017) Experience, productivity, and musculoskeletal injury among masonry workers. Journal of Construction Engineering and Management, 143(6): 05017003, ISSN 0733-9364

Ameyaw, E. E.; Agyekum-Mensah, G.; Kumar, B. and Edwards, D. J. (2026) Understanding barriers to the adoption of blockchain-enabled smart contracts in construction projects: Perspectives of construction practitioners. Smart and Sustainable Built Environment, 15(2), pp. 597-621. ISSN 2046-6099

Ammar, M A (2011) Optimization of project time-cost trade-off problem with discounted cash flows. Journal of Construction Engineering and Management, 137(1), pp. 65-71. ISSN 0733-9364

Ammar, M A (2020) Efficient modeling of time-cost trade-off problem by eliminating redundant paths. International Journal of Construction Management, 20(7), pp. 812-821. ISSN 1562-3599

Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193

Ammar, M A (2022) Optimization of line of balance scheduling considering work interruption. International Journal of Construction Management, 22(2), pp. 305-316. ISSN 1562-3599

Amoah, C and Nkosazana, H (2022) Effective management strategies for construction contract disputes. International Journal of Building Pathology and Adaptation, 41(6), pp. 70-84. ISSN 23984708

Amoo, O; Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in eastern cape South Africa: A case study. Journal of Construction Business and Management, 5(2), pp. 54-67. ISSN 2521-0165

Anthony Jnr, B (2025) A decentralized prototype framework for peer-to-peer based electric car sharing services towards sustainable road transportation. Smart and Sustainable Built Environment, 14(4), pp. 1172-1193. ISSN 2046-6099

Arditi, D; Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), pp. 90-103. ISSN 0969-9988

Ariffin, M H and Torrance, J V (2008) Social group related entry participation motivations for continuing professional development activities among malaysian registered quantity surveyors. Journal of Construction in Developing Countries, 13(2), pp. 1-19. ISSN 1823-6499

Arman, M H R (2014) Using option theory to manage risks in highway winter operations. PhD thesis, Purdue University, USA.

Asadi, R; Wilkinson, S and Rotimi, J O B (2021) Towards contracting strategy usage for rework in construction projects: A comprehensive review. Construction Management and Economics, 39(12), pp. 953-971. ISSN 01446193

Asadi, R; Wilkinson, S and Rotimi, J O B (2023) Mixed-method approach to the evaluation of rework provisions within general contract conditions. Construction Economics and Building, 23(3-4), pp. 45-70. ISSN 2204-9029

Asadi, R; Wilkinson, S and Rotimi, J O B (2023) The common causes of rework in construction contracts: A diagnostic approach. Journal of Engineering, Design and Technology, 21(4), pp. 1107-1133. ISSN 1726-0531

Asao, K; Miyamoto, T; Kato, H and Diaz, C E D (2013) Comparison of revenue guarantee programs in build-operation-transfer projects. Built Environment Project and Asset Management, 3(2), pp. 214-227. ISSN 2044-124X

Ashuri, B; Kashani, H; Molenaar, K R; Lee, S and Lu, J (2012) Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management, 138(4), pp. 545-557. ISSN 0733-9364

Athanasakis, D (2007) Has multiparty arbitration failed in construction disputes? Legal and practical issues in drafting joinder provisions. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Awodele, O A (2012) Framework for managing risk in privately financed market projects in Nigeria. PhD thesis, Heriot-Watt University, UK.

Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(6), pp. 875-900. ISSN 0969-9988

Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029

Badenfelt, U (2007) Trust and control in the early phases of target cost contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Baird, A (1995) Pioneering the NEC system of documents. Engineering, Construction and Architectural Management, 2(4), pp. 249-269. ISSN 0969-9988

Baltazar dos Santos, A P (2009) Cyberarchitecture: the virtualisation of architecture beyond representation towards interactivity. PhD thesis, University College London, UK.

Bao, F; Chen, C; Chan, A P C; Martek, I and Shrestha, A (2019) Dynamic framework transfer model for public-private partnerships: Lessons from a China water sector case study. Engineering, Construction and Architectural Management, 26(7), pp. 1218-1239. ISSN 0969-9988

Bassioni, H A; Hassan, T M and Price, A D F (2008) Evaluation and analysis of criteria and sub-criteria of a construction excellence model. Engineering, Construction and Architectural Management, 15(1), pp. 21-41. ISSN 0969-9988

Bayat, M; Khanzadi, M and Nasirzadeh, F (2020) Bargaining game model to determine concessionary items in build-operate-transfer contracts. Journal of Construction Engineering and Management, 146(2): 04019109, ISSN 0733-9364

Bayat, M; Khanzadi, M; Nasirzadeh, F and Chavoshian, A (2020) Financial conflict resolution model in BOT contracts using bargaining game theory. Construction Innovation, 20(1), pp. 18-42. ISSN 1471-4175

Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.

Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.

Bogenstätter, U (2000) Prediction and optimization of life-cycle costs in early design. Building Research & Information, 28(5-6), pp. 376-386. ISSN 0961-3218

Borrallo-Jiménez, M; Esquivias, P M; Fernández-Agüera, J and LopezDeAsiain, M (2025) Hybrid ventilation in a nearly zero-energy building as a function of users' habits for better indoor air quality and thermal comfort in a warm climate. Building Research & Information, 53(1-2), pp. 77-94. ISSN 0961-3218

Bos-de Vos, M; Lieftink, B; Volker, L and Wamelink, H (2014) International collaboration and partnering in the supply chain as business opportunities for architectural firms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Brandao, L E T and Saraiva, E (2008) The option value of government guarantees in infrastructure projects. Construction Management and Economics, 26(11), pp. 1171-1180. ISSN 1466433X

Broome, J C and Perry, J G (1995) Experiences of the use of the New Engineering Contract. Engineering, Construction and Architectural Management, 2(4), pp. 271-285. ISSN 0969-9988

Bröchner, J and Sjöström, C (2003) Quality and coordination: Internationalizing Swedish building research. Building Research & Information, 31(6), pp. 479-484. ISSN 0961-3218

Bu, Z; Liu, J and Lu, Z (2025) Research on dynamic profit distribution mechanism and options in PPP project value creation. Journal of Construction Engineering and Management, 151(12): 04025190, ISSN 0733-9364

Burke, R (2014) Risk management in Republic of Ireland PPP toll roads. PhD thesis, Queen's University Belfast, UK.

Buyukyoran, F and Gundes, S (2018) Optimized real options-based approach for government guarantees in PPP toll road projects. Construction Management and Economics, 36(4), pp. 203-216. ISSN 01446193

Candaş, A B (2022) Multipurpose semantic analysis of construction text documentation. PhD thesis, Middle East Technical University, Turkey.

Candaş, A B and Tokdemir, O B (2022) Automated identification of vagueness in the FIDIC silver book conditions of contract. Journal of Construction Engineering and Management, 148(4): 04022007, ISSN 0733-9364

Capace, Brunella (2019) NDT application in transport asset management: Qa/qc performance specifications in pavement construction and maintenance. PhD thesis, Università degli Studi di Catania, Italy.

Carbonara, N; Costantino, N and Pellegrino, R (2014) Revenue guarantee in public-private partnerships: A fair risk allocation model. Construction Management and Economics, 32(4), pp. 403-415. ISSN 01446193

Carbonara, N and Pellegrino, R (2018) Revenue guarantee in public-private partnerships: A win–win model. Construction Management and Economics, 36(10), pp. 584-598. ISSN 01446193

Cartigny, T and Lord, W (2017) Defining social value in the UK construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 107-114. ISSN 17514304

Castelblanco, G; Mangano, G; Zenezini, G and De Marco, A (2025) Once concessioned, twice shy? Asymmetries of "reconcession" in national PPP programs. Construction Management and Economics, 43(6), pp. 405-427. ISSN 0144-6193

Cavalcante, C A V; Alencar, M H and Lopes, R S (2017) Multicriteria model to support maintenance planning in residential complexes under warranty. Journal of Construction Engineering and Management, 143(4): 04016110, ISSN 0733-9364

Ceran, N (2002) Private participation in infrastructure: A risk analysis of long-term contracts in power sector. PhD thesis, George Mason University, USA.

Chapman, C and Ward, S (2008) Developing and implementing a balanced incentive and risk sharing contract. Construction Management and Economics, 26(6), pp. 659-669. ISSN 1466433X

Charlson, J and Dimka, N (2021) Design, manufacture and construct procurement model for volumetric offsite manufacturing in the UK housing sector. Construction Innovation, 21(4), pp. 800-817. ISSN 1471-4175

Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387

Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(5), pp. 545-554. ISSN 1466433X

Checherita, C D (2009) A macroeconomic analysis of investment under public-private partnerships and its policy implications—the case of developing countries. PhD thesis, George Mason University, USA.

Chen, B (2018) Contribution of process-technology fit to IT business value: the case of BIM in the construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance. PhD thesis, Columbia University, USA.

Chiara, N and Garvin, M (2008) Variance models for project financial risk analysis with applications to greenfield BOT highway projects. Construction Management and Economics, 26(9), pp. 925-939. ISSN 1466433X

Chmielewski, H T (2023) Overcoming modeling barriers in long-term interdependent infrastructure systems planning. PhD thesis, North Carolina State University, USA.

Chovichien, V and Suriyanon, N (2011) Attitudes of people in the Thai construction industry sector on issues related to delay in the approval of submittals. Journal of Construction in Developing Countries, 16(1), pp. 41-67. ISSN 1823-6499

Chritamara, S (2017) An application of the real option framework to large infrastructure projects: evidence for Thailand's transportation system. PhD thesis, University of Newcastle upon Tyne, UK.

Cirrincione, Laura (2021) Simulation and experimental methods for improving energy efficiency, environmental performance and resilience of single and clustered groups of buildings. PhD thesis, Università degli Studi di Palermo, Italy.

Conejos, S; Chew, M Y L and Yung, E H K (2017) The future adaptivity of nineteenth century heritage buildings. International Journal of Building Pathology and Adaptation, 35(4), pp. 332-347.

Coombe-Davies, M (1985) The laws on contract liability as they specifically relate to architectural practice. PhD thesis, University College Cardiff, UK.

Crespin-Mazet, F (2007) Co-Development as an alternative to competitive bidding in project business. PhD thesis, University of Manchester, UK.

Danku, J C (2020) Exploring the concept of social licence in the construction industry of a developing country. Journal of Construction Business and Management, 4(2), pp. 25-33. ISSN 2521-0165

Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.

Dağkıran, G (2015) A multi agent risk analysis and sharing platform for international construction projects. PhD thesis, Middle East Technical University, Turkey.

De Marco, A and Mangano, G (2013) Risk and value in privately financed health care projects. Journal of Construction Engineering and Management, 139(8), pp. 918-926. ISSN 0733-9364

De Marco, A; Mangano, G; Cagliano, A C and Grimaldi, S (2012) Public financing into build-operate-transfer hospital projects in Italy. Journal of Construction Engineering and Management, 138(11), pp. 1294-1302. ISSN 0733-9364

De Oliveira, A L and Prudêncio, L R (2015) Evaluation of the superficial texture of concrete pavers using digital image processing. Journal of Construction Engineering and Management, 141(10): 04015034, ISSN 0733-9364

Del Ceno, J S (2012) Selective licensing and resident satisfaction in social housing: A UK case study. International Journal of Law in the Built Environment, 4(2), pp. 126-139. ISSN 1756-1450

Devapriya, K A K (2003) Donor-intervention and debt capacity in private infrastructure project finance in developing countries. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Devapriya, K A K and Pretorius, F I H (2002) Project finance in Asia: Governing variables of past, present, and future pf arrangements in power projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Dhanshyam, M and Srivastava, S K (2023) Decision framework for efficient risk mitigation in BOT highway infrastructure service projects. Journal of Construction Engineering and Management, 149(9): 04023081, ISSN 0733-9364

Dias Jr., A (1994) A managerial and financial study on the involvement of private sector companies in the development, construction, operation, and ownership of infrastructure projects. PhD thesis, University of Michigan, USA.

Ding, Z; Zheng, K and Tan, Y (2022) BIM research vs BIM practice: A bibliometric-qualitative analysis from China. Engineering, Construction and Architectural Management, 29(9), pp. 3520-3546. ISSN 0969-9988

Dithebe, K; Aigbavboa, C O; Thwala, W D and Oke, A E (2019) Factor analysis of critical success factors for water infrastructure projects delivered under public-private partnerships. Journal of Financial Management of Property and Construction, 24(3), pp. 338-357. ISSN 1366-4387

Dixon, M (2013) Title by registration or conquest: Interpreting the Land Registration Act 2002 in England and Wales. International Journal of Law in the Built Environment, 5(3), pp. 194-206. ISSN 17561469

Doan, P and Menyah, K (2013) Impact of irreversibility and uncertainty on the timing of infrastructure projects. Journal of Construction Engineering and Management, 139(3), pp. 331-338. ISSN 0733-9364

Donohoe, S (2010) Attitudes to sustainable construction and contracts: International perspectives and approaches. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Eaglestone, F N (1993) An improved method of requesting insurance under UK construction contracts. PhD thesis, City, University of London, UK.

Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364

Eccles, T S (2009) The English building industry in late modernity: an empirical investigation of the definition, construction and meaning of profession. PhD thesis, London School of Economics and Political Science, UK.

Egwunatum, S I; Anumudu, A C; Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(1), pp. 354-382. ISSN 0969-9988

Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects. PhD thesis, Heriot-Watt University, UK.

Enshassi, A; Arain, F M and Tayeh, B (2010) Subcontractor prequalification practices in Palestine. International Journal of Construction Management, 10(4), pp. 45-74. ISSN 1562-3599

Erpen, Mauro Luiz (2020) Analysis of the perception of relative importance of critical success factors in the civil construction industry using artificial neural networks. PhD thesis, Universidade de Brasília, Brazil.

Faraj, I (2001) Verification and spatial clearance of features in a product modelling environment. Construction Innovation, 1(1), pp. 55-74. ISSN 1471-4175

Fenn, J E; Hutchings, D M and Burr, K L (2008) The purposes for state residential general contractor licensing in the United States. International Journal of Construction Education and Research, 4(2), pp. 67-81. ISSN 1557-8771

Figliola, A; Canducci, A; Calcagni, L and Battisti, A (2024) Passive strategies for climate change mitigation in architectural heritage: the case study of Santa Maria in Trastevere Basilica, Rome. Building Research & Information, 52(7), pp. 725-747. ISSN 0961-3218

Finnie, D (2012) Contract delay what is it and how are we performing? Construction Economics and Building, 12(1), pp. 83-91. ISSN 2204-9029

Florencio, Lutemberg de Araújo (2018) Structuring of a rating system for the classification of risk of linking commercial real estate properties as guarantee for long-term credit operations. PhD thesis, Universidade de São Paulo, Brazil.

French, T R (2012) Evolutionary optimisation of network flow plans for emergency movement in the built environment. PhD thesis, University of Edinburgh, UK.

Gajendran, T; Brewer, G; Runeson, G and Dainty, A (2011) Investigating informality in construction: Philosophy, paradigm and practice. Construction Economics and Building, 11(2), pp. 84-98. ISSN 2204-9029

Gao, M Y; Han, J; Yang, Y; Tiong, R L K; Zhao, C and Han, C (2024) BIM-based and IoT-driven smart tracking for precast construction dynamic scheduling. Journal of Construction Engineering and Management, 150(9): 04024117, ISSN 0733-9364

Gatti, M P (2018) Maintenance, reconstruction and prevention for the regeneration of historic towns and centers. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 96-111. ISSN 1759-5916

Georgiou, Jim (2016) Legislative control and the quality of housing in Victoria. PhD thesis, University of Melbourne, Australia.

Ghanem, A (2007) Real-time construction project progress tracking: A hybrid model for wireless technologies selection, assessment, and implementation. PhD thesis, Florida State University, USA.

Gilbert, P (2009) Social stakes of urban renewal: Recent French housing policy. Building Research & Information, 37(5-6), pp. 638-648. ISSN 0961-3218

Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.

Golden, S K (2008) Immigration and construction: An analysis of the impact of immigration on construction project costs. PhD thesis, University of Maryland, College Park, USA.

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.

Gschösser, F (2011) Environmental assessment of road constructions: Life cycle assessment of Swiss road pavements and an accompanying analysis of construction and maintenance costs. DSc thesis, ETH Zürich, Switzerland.

Gu, T; Hao, E; Dirks, K; Kieu, M and Zhang, R (2026) Enhancing residents' satisfaction in old community renewal: Application and validation of an extended expectation-disconfirmation theory model. Journal of Construction Engineering and Management, 152(4): 04026023, ISSN 0733-9364

Guo, J; Chen, J and Xie, Y (2022) Determining a reasonable concession period for risky transportation BOT projects with government subsidies based on cumulative prospect theory. Engineering, Construction and Architectural Management, 29(3), pp. 1396-1426. ISSN 0969-9988

Guo, K; Zhang, L and Wang, T (2021) Concession period optimisation in complex projects under uncertainty: A public-private partnership perspective. Construction Management and Economics, 39(2), pp. 156-172. ISSN 01446193

Guo, Y; Su, Y; Chen, C and Martek, I (2024) Inclusion of "managing flexibility" valuations in the pricing of PPP projects: A multi-objective decision-making method. Engineering, Construction and Architectural Management, 31(11), pp. 4562-4584. ISSN 0969-9988

Haga, Heitor Cesar Riogi (2008) Production and sales sectors of materials in the house construction production chain: Diagnosis for the development of technological foresight studies. PhD thesis, Universidade de São Paulo, Brazil.

Haj Kazem Kashani, H (2012) A real options model for the financial valuation of infrastructure systems under uncertainty. PhD thesis, Georgia Institute of Technology, USA.

Hamledari, H; Sajedi, S; McCabe, B and Fischer, M (2021) Automation of inspection mission planning using 4D bims and in support of unmanned aerial vehicle-based data collection. Journal of Construction Engineering and Management, 147(3): 4020179, ISSN 0733-9364

Han, Bing (2022) Implementing virtual reality-based design review in the construction industry. PhD thesis, University of Texas at Austin, USA.

Hao, Z; Wang, Y; Zhang, Y and Gong, E (2024) Evolutionary game analysis of stakeholders in villages-in-city reconstruction: Pazhou village as an example. International Journal of Construction Management, 24(1), pp. 31-43. ISSN 1562-3599

Hassanein, A A G and el Nemr, W (2007) Management of change order claims in the Egyptian industrial construction sector. Journal of Financial Management of Property and Construction, 12(1), pp. 45-60. ISSN 1366-4387

Hegazy, T (1999) Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), pp. 167-175. ISSN 0733-9364

Hegazy, T; Saad, D A and Mostafa, K (2020) Enhanced repetitive-scheduling computation and visualization. Journal of Construction Engineering and Management, 146(10): 04020118, ISSN 0733-9364

Herzog, Florian (2005) Strategic portfolio management for long-term investments: An optimal control approach. PhD thesis, ETH Zürich, Switzerland.

Ho, S P and Liu, L Y (2002) An option pricing-based model for evaluating the financial viability of privatized infrastructure projects. Construction Management and Economics, 20(2), pp. 143-156. ISSN 01446193

Ho, S-P (2001) Real options and game theoretic valuation, financing and tendering for investments on build-operate-transfer projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hu, H and Zhu, Y (2015) Social welfare-based concession model for build/operate/transfer contracts. Journal of Construction Engineering and Management, 141(1): 04014064, ISSN 0733-9364

Hua, Y; Kang, F; Zhang, S and Li, J (2023) Impacts of task interdependence and equivocality on ICT adoption in the construction industry: A task-technology fit view. Architectural Engineering and Design Management, 19(1), pp. 92-109. ISSN 1745-2007

Huang, Y L (2008) The pricing of conditional performance guarantees with risky collateral. Construction Management and Economics, 26(9), pp. 967-978. ISSN 1466433X

Huang, Y L (2009) Prediction of contractor default probability using structural models of credit risk: An empirical investigation. Construction Management and Economics, 27(6), pp. 581-596. ISSN 1466433X

Huang, Y L and Chou, S P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(4), pp. 379-389. ISSN 01446193

Hughes, W P and Shinoda, H (1999) Achieving satisfactory contractual terms for the engineer's role. In: Hughes, W P (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Husain, T (2023) Foreign investment and infrastructure financing: railways during the first age of globalisation. PhD thesis, University College London, UK.

Hussain, R S (2017) Investigating the business process implications of managing road works and street works. PhD thesis, Loughborough University, UK.

Ibrahim, A D; Price, A D F and Dainty, A R J (2006) The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria. Journal of Financial Management of Property and Construction, 11(3), pp. 149-164. ISSN 1366-4387

Israel, B (2023) The impact of clients' procurement challenges on the substance goals of roads construction projects in songwe, Tanzania. International Journal of Construction Management, 23(12), pp. 2144-2150. ISSN 1562-3599

Issa, D (2016) Understanding performance measurement in private prisons: A complexity perspective approach. PhD thesis, University of Manchester, UK.

Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X

Jang, W; Yu, G; Jung, W; Kim, D and Han, S H (2018) Financial conflict resolution for public-private partnership projects using a three-phase game framework. Journal of Construction Engineering and Management, 144(3): 05017022, ISSN 0733-9364

Javed, A A; Lam, P T I and Chan, A P C (2014) Change negotiation in public-private partnership projects through output specifications: An experimental approach based on game theory. Construction Management and Economics, 32(4), pp. 323-348. ISSN 01446193

Jayasuriya, S; Zhang, G and Jing Yang, R (2019) Challenges in public private partnerships in construction industry: A review and further research directions. Built Environment Project and Asset Management, 9(2), pp. 172-185. ISSN 2044-124X

Jayasuriya, Sajani (2018) A systematic stakeholder management framework for managing public private partnership projects in Australia. PhD thesis, RMIT University, Australia.

Jefferies, M and Chen, S E (2004) Identifying risk factors of boot procurement: A case study of stadium Australia. Construction Economics and Building, 4(1), pp. 11-20. ISSN 2204-9029

Jin, H; Chan, M and Bai, Y (2025) Joint optimization of critical concession parameters for sustainable PPP contracts. Journal of Construction Engineering and Management, 151(6): 04025051, ISSN 0733-9364

Jin, H; Liu, S; Li, J and Liu, C (2020) A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs. International Journal of Construction Management, 20(6), pp. 642-652. ISSN 1562-3599

Jin, H; Liu, S; Li, J and Liu, C (2023) Determination of government guarantee and revenue cap in public-private partnership contracts. Engineering, Construction and Architectural Management, 30(2), pp. 393-414. ISSN 0969-9988

Jin, H; Liu, S; Liu, C and Udawatta, N (2019) Optimizing the concession period of PPP projects for fair allocation of financial risk. Engineering, Construction and Architectural Management, 26(10), pp. 2347-2363. ISSN 0969-9988

Jordan, M R C (2005) The design, use and implementation of maintenance management systems and pavement management systems for whole life costing. Unpublished PhD thesis, Curtin University of Technology, Australia.

Juan, C and Olmos, F (2019) Public-private equity joint ventures and risk transfers in motorways of the sea. Built Environment Project and Asset Management, 9(5), pp. 669-682. ISSN 2044-124X

Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.

Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(1-2), pp. 133-145. ISSN 0969-9988

Kamel, M; Khallaf, R and Nosaier, I (2023) Net present value-time curve behaviour of public private partnership projects. International Journal of Construction Management, 23(11), pp. 1924-1931. ISSN 1562-3599

Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193

Karunaratne, Roshan (2022) Optimisation of prefabricated modular-integrated residential construction using hybrid customisation methods. PhD thesis, University of Melbourne, Australia.

Kashiwagi, D T; Slater, C and Kashiwagi, M (2002) 'Just in time' information for performance based systems. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Kathri, A K D (2003) A study of project finance in Asia with emphasis on private infrastructure project finance. PhD thesis, University of Hong Kong, Hong Kong.

Ke, Y (2020) Impact of trust on the performance of construction enterprises: analysis of the cooperative process mechanism in the context of Chaoshan culture. DProf thesis, Fordham University, USA.

Keyser, A (2012) Funding model for bulk raw water infrastructure in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 55-64. ISSN 17514312

Khoza, R B M (2021) Performance measurements on concession periods to forecast water infrastructure investment returns. PhD thesis, Walden University, USA.

Kidd, A; Appelbe, S and Morgan, A (2015) The use and abuse of programmes in construction contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 294-301. ISSN 17514304

Krainer, Christiane Wagner Mainardes (2021) Model of social capital accumulation in civil construction companies. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.

Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Landy, M F B (2022) Integrating quality and innovation in services in dynamic and turbulent environments. PhD thesis, Universidade do Minho, Portugal.

Laryea, S A and Hughes, W P (2009) Commercial reviews in the tender process of contractors. Engineering, Construction and Architectural Management, 16(6), pp. 558-572. ISSN 0969-9988

Lawani, A (2018) Investigating project management practice in Nigerian government construction organisations: a systems thinking approach. PhD thesis, Robert Gordon University, UK.

Leather, P and Rolfe, S J (1997) Fit for the task: The future of the small scale domestic repair and maintenance industry in the UK. Construction Management and Economics, 15(2), pp. 201-212. ISSN 01446193

Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364

Lee, S (2000) Spatial model and decentralized path planning for construction automation. PhD thesis, University of Wisconsin - Madison, USA.

Lee, S (2007) Entry decision for unsolicited build-operate-transfer (BOT) highway projects: Real options approach. PhD thesis, University of Colorado at Boulder, USA.

Leite Júnior, José Agnaldo Pereira (2016) Analysis of the quality of work life applications in the construction industry. PhD thesis, Universidade Estadual de Campinas, Brazil.

Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2005) Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics, 23(5), pp. 459-471. ISSN 01446193

Li, H; Arditi, D and Wang, Z (2013) Factors that affect transaction costs in construction projects. Journal of Construction Engineering and Management, 139(1), pp. 60-68. ISSN 0733-9364

Li, H; Wang, M and Dong, X (2019) Resource leveling in projects with stochastic minimum time lags. Journal of Construction Engineering and Management, 145(4): 04019015, ISSN 0733-9364

Li, J and Zou, P X W (2011) Fuzzy AHP-based risk assessment methodology for PPP projects. Journal of Construction Engineering and Management, 137(12), pp. 1205-1209. ISSN 0733-9364

Li, K and Cheung, S O (2016) The potential of bias in multi-tier construction dispute resolution processes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Li, M; Zheng, Q and Ashuri, B (2024) Application of artificial intelligence in design automation: A two-stage framework for structure configuration and design. Journal of Construction Engineering and Management, 150(8): 04024083, ISSN 0733-9364

Li, S (1998) An investigation of the build operate transfer approach for infrastucture works in the People's Republic of China. PhD thesis, University of Reading, UK.

Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization. PhD thesis, Purdue University, USA.

Li, Y; Nie, X and Chen, S (2007) Fuzzy approach to prequalifying construction contractors. Journal of Construction Engineering and Management, 133(1), pp. 40-49. ISSN 0733-9364

Lim, T (2009) Essence of time in construction contracts. Construction Economics and Building, 9(2), pp. 1-6. ISSN 2204-9029

Ling, F Y Y and Khoo, W W (2016) Improving relationships in project teams in Malaysia. Built Environment Project and Asset Management, 6(3), pp. 284-301. ISSN 2044-124X

Liou, F M and Huang, C P (2008) Automated approach to negotiations of BOT contracts with the consideration of project risk. Journal of Construction Engineering and Management, 134(1), pp. 18-24. ISSN 0733-9364

Liu, H (2013) Adaptive optimization methods in system-level bridge management. PhD thesis, University of California, Berkeley, USA.

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X

Liu, K; Liu, Y and Kou, Y (2025) External drivers of inter-organizational collaboration in megaproject: A perspective based on project governance. Engineering, Construction and Architectural Management, 32(5), pp. 2920-2941. ISSN 0969-9988

Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(1), pp. 128-149. ISSN 0969-9988

Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2022) Development and testing of a rent determination framework for PPP rental villages. International Journal of Construction Management, 22(2), pp. 192-204. ISSN 1562-3599

Liu, T; Bennon, M; Garvin, M J and Wang, S (2017) Sharing the big risk: Assessment framework for revenue risk sharing mechanisms in transportation public-private partnerships. Journal of Construction Engineering and Management, 143(12): 04017086, ISSN 0733-9364

Lo, W and Yan, M R (2009) Evaluating qualification-based selection system: A simulation approach. Journal of Construction Engineering and Management, 135(6), pp. 458-465. ISSN 0733-9364

Loosemore, M and Lim, B T H (2017) Linking corporate social responsibility and organizational performance in the construction industry. Construction Management and Economics, 35(3), pp. 90-105. ISSN 01446193

Lu, H (2002) Extended production integration for construction (epic): An integration system for building construction. PhD thesis, University of Florida, USA.

Lu, W; Li, Z and Wang, S (2017) The role of justice for cooperation and contract's moderating effect in construction dispute negotiation. Engineering, Construction and Architectural Management, 24(1), pp. 133-153. ISSN 0969-9988

Lu, W; Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(4), pp. 448-463. ISSN 0969-9988

Lu, W; Zhang, L and Zhang, L (2016) Effect of contract completeness on contractors' opportunistic behavior and the moderating role of interdependence. Journal of Construction Engineering and Management, 142(6): 04016004, ISSN 0733-9364

Luise Valencia Gluyas, J (2004) Public-private participation in water infrastructure in Mexico. PhD thesis, University of Leeds, UK.

Lundström, A; Savolainen, J and Kostiainen, E (2016) Case study: Developing campus spaces through co-creation. Architectural Engineering and Design Management, 12(6), pp. 409-426. ISSN 1745-2007

Luo, Y and Chen, Y (2023) Understanding the relationship between asset specificity and governance choices in construction projects: Moderating role of uncertainty. Journal of Construction Engineering and Management, 149(3): 04022178, ISSN 0733-9364

Makwiranzou, C (2019) Building trust and managing risk between the client, consultant, and contractor in traditional and relational construction projects. PhD thesis, University of Liverpool, UK.

Mangano, G; Castelblanco, G; De Marco, A and Ottaviani, F M (2025) Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), pp. 193-210. ISSN 2044-124X

Martin-Du Pan, O; Eames, P; Rowley, P; Bouchlaghem, D and Susman, G (2015) Current and future operation scenarios for a 50,000 MWh district heating system. Architectural Engineering and Design Management, 11(4), pp. 280-304. ISSN 1745-2007

Marxen, K (2017) Demand guarantees in the construction industry: A comparative legal study of their use and abuse from a South African, English and German perspective. LLD thesis, University of Johannesburg, South Africa.

Mason, B (2023) Advancing autonomous green stormwater infrastructure. PhD thesis, University of Michigan, USA.

Mat Zin, R (2006) A case study of management control. A construction project: Issues of transaction costs and trust. PhD thesis, University of Manchester, UK.

Matipa, W M; Bain, I A and Naik, B (2010) Cost optimization techniques for sustainable buildings: Analysis beyond energy performance certificates. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Matthews, J; Tyler, A and Thorpe, A (1996) Pre-construction project partnering: Developing the process. Engineering, Construction and Architectural Management, 3(1-2), pp. 117-131. ISSN 0969-9988

Meng, X (2002) Guarantees for contractor's performance and owner's payment in China. Journal of Construction Engineering and Management, 128(3), pp. 232-237. ISSN 0733-9364

Mestizo Reyes, Rubén D (2018) Political risk and success factors in public-private partnerships at the subnational level: The case of road infrastructure concessions. DBA thesis, Pontificia Universidad Catolica del Peru, Peru.

Mills, A; Love, P E D and Williams, P (2009) Defect costs in residential construction. Journal of Construction Engineering and Management, 135(1), pp. 12-16. ISSN 0733-9364

Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.

Mirza, M B; Malik, S; Afzal, N and Ali Kazmi, S J (2025) Examining the impact of conflict resolution, emotional intelligence on project team performance: A study in the construction industry of Pakistan. International Journal of Construction Management, 25(16), pp. 2030-2040. ISSN 1562-3599

Mirzadeh, I (2014) More roads for the money. PhD thesis, KTH Royal Institute of Technology, Sweden.

Mitropoulos, P and Howell, G (2001) Model for understanding, preventing, and resolving project disputes. Journal of Construction Engineering and Management, 127(3), pp. 223-231. ISSN 0733-9364

Molwus, J J (2014) Stakeholder management in construction projects: a life cycle based framework. PhD thesis, Heriot-Watt University, UK.

Monticelli, C and Zanelli, A (2021) Material saving and building component efficiency as main eco-design principles for membrane architecture: Case: studies of etfe enclosures. Architectural Engineering and Design Management, 17(3-4), pp. 264-280. ISSN 1745-2007

Moselhi, O and Ei-Rayes, K (1993) Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, 119(4), pp. 681-697. ISSN 0733-9364

Moza, A and Paul, V K (2019) Analysis of claims in public works construction contracts in India. Journal of Construction in Developing Countries, 23(2), pp. 7-26. ISSN 1823-6499

Mukoki, P S (2022) Infrastructure financing and bond markets development in Sub-Saharan Africa. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Mwesigwa, R; Nabwami, R; Mayengo, J and Basulira, G (2020) Contractual completeness as a cornerstone to stakeholder management in public private partnership projects in Uganda. Built Environment Project and Asset Management, 10(3), pp. 469-484. ISSN 2044-124X

Nabil, A (2016) P.A.L.M. - physical asset lifecycle modelling in the healthcare sector. PhD thesis, University College London, UK.

Naghshbandi, Seyedeh Neda (2022) Technology capabilities for safe and resilient coordination of automated earthwork systems: a decentralized multi-agent system approach. PhD thesis, University College London, UK.

Naji Almassi, A (2011) Credit value adjusted real options based valuation of multiple-exercise government guarantees for infrastructure projects. PhD thesis, University of Toronto, Canada.

Nathan, K V S K (1994) Submission to ICSID in breach of the convention: disputes in international civil engineering contracts. PhD thesis, Queen Mary University of London, UK.

Nayyer, M I; Aravindan, M R and Annamalai, T R (2024) Impact of transparency law on the post-award development phase of toll and annuity PPPs. Built Environment Project and Asset Management, 14(1), pp. 22-37. ISSN 2044-124X

Ndekugri, I (1999) Performance bonds and guarantees: Construction owners and professionals beware. Journal of Construction Engineering and Management, 125(6), pp. 428-436. ISSN 0733-9364

Ngoc-Thoan, N; Bui, D Q T; Tran, C N N and Tran, D H (2024) Improved detection network model based on yolov5 for warning safety in construction sites. International Journal of Construction Management, 24(9), pp. 1007-1017. ISSN 1562-3599

Nguyen, A; Mollik, A and Chih, Y Y (2018) Managing critical risks affecting the financial viability of public-private partnership projects: Case study of toll road projects in Vietnam. Journal of Construction Engineering and Management, 144(12): 05018014, ISSN 0733-9364

Nguyen, N; Almarri, K and Boussabaine, H (2021) A risk-adjusted decoupled-net-present-value model to determine the optimal concession period of BOT projects. Built Environment Project and Asset Management, 11(1), pp. 4-21. ISSN 2044-124X

Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.

Nicholas, J; Holt, G D and Mihsein, M (2000) Predicting materials suppliers' bad debt. Journal of Construction Research, 1(2), pp. 159-167. ISSN 1609-9451

Nik Bakht, M (2015) Analyzing social network discussions of infrastructure projects: towards a bottom-up decision making environment. PhD thesis, University of Toronto, Canada.

Nzekwe-Excel, C (2010) Development of an integrated framework for satisfaction assessment of construction project teams. PhD thesis, University of Wolverhampton, UK.

Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.

Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Ogwueleka, A C and Udoudoh, F P (2018) The impact of risk and reward dynamics in incentive compensation plans in the Nigerian construction industry. International Journal of Construction Management, 18(3), pp. 247-259. ISSN 1562-3599

Ojebode, A J (2016) Public-private partnership (PPP) as a mechanism for the provision of affordable housing delivery in Nigeria. PhD thesis, University of Brighton, UK.

Ojuri, Omoleye B (2020) Prescribing social value co-creation in networks for the Nigerian water supply sector. PhD thesis, University College London, UK.

Oke, A E (2018) Bonding capability of Nigerian contracting firms. Engineering, Construction and Architectural Management, 25(6), pp. 707-720. ISSN 0969-9988

Oke, A E and Ogunsemi, D R (2016) Structural equation modelling of construction bond administration. Journal of Financial Management of Property and Construction, 21(3), pp. 192-211. ISSN 1366-4387

Oliveros-Romero, J and Paton-Cole, V P (2023) Infrastructure development: Reflections on Sierra Leone infrastructure scheme and the lungi bridge project. Journal of Financial Management of Property and Construction, 28(1), pp. 127-144. ISSN 1366-4387

Omopariola, E D and Windapo, A O (2019) Domino effect of timely payment of contractors on project and organisation performance. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Opawole, A and Jagboro, G O (2018) Compensation mechanisms for minimizing private party risks in concession-based public-private partnership contracts. International Journal of Building Pathology and Adaptation, 36(1), pp. 93-120. ISSN 23984708

Osipova, E and Eriksson, P E (2011) How procurement options influence risk management in construction projects. Construction Management and Economics, 29(11), pp. 1149-1158. ISSN 1466433X

Osuolale, M. D. and Felkner, J. (2026) From awareness to adoption: A theoretically grounded analysis of professional pathways in sustainable construction material usage in Nigeria. Journal of Engineering, Design and Technology, 24(4), pp. 963-991. ISSN 1726-0531

Oviedo-Haito, R J; Jiménez, J; Cardoso, F F and Pellicer, E (2014) Survival factors for subcontractors in economic downturns. Journal of Construction Engineering and Management, 140(3): 4013056, ISSN 0733-9364

Owolabi, H (2018) Public accountability: The case of government guarantee scheme in PFI/PPP projects. PhD thesis, University of the West of England, Bristol, UK.

Palaneeswaran, E and Kumaraswamy, M M (1999) Dynamic contractor pre-qualification. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Park, M and Peña-Mora, F (2004) Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5), pp. 626-637. ISSN 0733-9364

Patel, T D; Haupt, T C and Bhatt, T (2020) Fuzzy probabilistic approach for risk assessment of BOT toll roads in Indian context. Journal of Engineering, Design and Technology, 18(1), pp. 251-269. ISSN 1726-0531

Peckham, G E (1971) The systems approach to school construction: the potential benefits, the necessary conditions, and the implications for Michigan schools. PhD thesis, Michigan State University, USA.

Pellegrino, R (2021) Effects of public supports for mitigating revenue risk in public-private partnership projects: Model to choose among support alternatives. Journal of Construction Engineering and Management, 147(12), ISSN 0733-9364

Pellegrino, R; Carbonara, N and Costantino, N (2019) Public guarantees for mitigating interest rate risk in PPP projects. Built Environment Project and Asset Management, 9(2), pp. 248-261. ISSN 2044-124X

Pellegrino, R; Vajdic, N and Carbonara, N (2013) Real option theory for risk mitigation in transport PPPs. Built Environment Project and Asset Management, 3(2), pp. 199-213. ISSN 2044-124X

Pereira, Ana Paula Carvalho (2017) Building information modeling in the project phase: A proposal for a BIM execution plan for SUMAI / UFBA. PhD thesis, Universidade Federal da Bahia, Brazil.

Pinero, J C (2003) A framework for monitoring performance-based road maintenance. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Piroozfar, P; Altan, H and Popovic-Larsen, O (2012) Design for sustainability: A comparative study of a customized modern method of construction versus conventional methods of construction. Architectural Engineering and Design Management, 8(1), pp. 55-75. ISSN 1745-2007

Poulsom, M W (2017) S.62 LPA 1925: Restating the case for reform. International Journal of Law in the Built Environment, 9(1), pp. 79-91. ISSN 1756-1450

Price, A D F and Shawa, H H (1997) Risk and risk management in project related finance. Journal of Construction Procurement, 3(3), pp. 27-46. ISSN 1358-9180

Pérez, Z G (2005) Appropriate designs and appropriating irrigation systems : Irrigation infrastructure development and users' management capability in Bolivia. PhD thesis, Wageningen University and Research, Netherlands.

Rahman, M M (2003) Revitalising construction project procurement through joint risk management. PhD thesis, University of Hong Kong, Hong Kong.

Rahman, M M and Kumaraswamy, M M (2001) Appraising the potential for joint risk management. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Rahman, M M and Kumaraswamy, M M (2005) Assembling integrated project teams for joint risk management. Construction Management and Economics, 23(4), pp. 365-375. ISSN 01446193

Rameezdeen, R and Rodrigo, A (2013) Textual complexity of standard conditions used in the construction industry. Construction Economics and Building, 13(1), pp. 1-12. ISSN 2204-9029

Rampini, Luca (2023) Artificial intelligence enhances digital asset management. PhD thesis, Politecnico di Milano, Italy.

Ritter, V (2012) Optimizing the combination of active and passive building components in refurbishment projects to allow for net-zero emission architecture. DSc thesis, ETH Zürich, Switzerland.

Rizzi, Dario (2025) Tools for sustainable design strategies: Optimization of integrated BIM-blockchain technologies and protocols for the application of minimum environmental criteria. PhD thesis, Università degli Studi di Ferrara, Italy.

Rodrigo, Thanuja K (2012) Mitigating the risk of unfair demands under on-demand guarantees in the export and construction industries in Sri Lanka: A proposal for legal and structural reform. PhD thesis, Griffith University, Sri Lanka.

Rodrigues Aragao, R (2018) Using network theory to manage knowledge from unstructured data in construction projects: Application to a collaborative analysis of the energy consumption in the construction of oil and gas facilities. PhD thesis, University of Toronto, Canada.

Rodriguez, F S; Spilski, J; Hekele, F; Beese, N O and Lachmann, T (2020) Physical and cognitive demands of work in building construction. Engineering, Construction and Architectural Management, 27(3), pp. 745-764. ISSN 0969-9988

Rooke, J; Seymour, D and Fellows, R (2004) Planning for claims: An ethnography of industry culture. Construction Management and Economics, 22(6), pp. 655-662. ISSN 01446193

Rosa, Fabiana Pires (2021) Proposal for a management model for the building maintenance phase, using the BIM concept, focusing on preventive maintenance. PhD thesis, Universidade do Vale do Rio dos Sinos, Brazil.

Rosas Sanchez, L (2008) Application of game modeling to good tunneling practice. PhD thesis, University of Colorado at Boulder, USA.

Rosenfeld, Y; Warszawski, A and Laufer, A (1992) Using quality circles to raise productivity and quality of work life. Journal of Construction Engineering and Management, 118(1), pp. 17-33. ISSN 0733-9364

Ruiz, L; Gómez, E; Santos, A G and Vega, S (2010) Study of light-multi-layered façades. Engineering, Construction and Architectural Management, 17(1), pp. 65-77. ISSN 0969-9988

Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218

Salami, B A; Ajayi, S O and Oyegoke, A S (2023) Tackling the impacts of covid-19 on construction projects: An exploration of contractual dispute avoidance measures adopted by construction firms. International Journal of Construction Management, 23(7), pp. 1196-1204. ISSN 1562-3599

Salminen, J (2005) Measuring performance and determining success factors of construction sites. PhD thesis, Helsinki University of Technology, Finland.

Satish, S. and Umar, T. (2026) Bridging innovation and practice: Assessing the readiness for 3D printing in construction. Engineering, Construction and Architectural Management, 33(7), pp. 6014-6038. ISSN 0969-9988

Scott, S (1997) Delay claims in UK contracts. Journal of Construction Engineering and Management, 123(3), pp. 238-244. ISSN 0733-9364

Selberherr, J (2015) Sustainable life cycle offers through cooperation. Smart and Sustainable Built Environment, 4(1), pp. 4-24. ISSN 2046-6099

Semple, C; Hartman, F T and Jergeas, G (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), pp. 785-795. ISSN 0733-9364

Sfakianakis, E and van de Laar, M (2013) Fiscal effects and public risk in public-private partnerships. Built Environment Project and Asset Management, 3(2), pp. 181-198. ISSN 2044-124X

Shakeri, E (2002) An investigation of privately promoted infrastructure (ppi) strategy in developing countries: Public-private partnership (ppp) approach. PhD thesis, University of Manchester, UK.

Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(6), pp. 1004-1023. ISSN 0969-9988

Shan, L; Garvin, M J and Kumar, R (2010) Collar options to manage revenue risks in real toll public-private partnership transportation projects. Construction Management and Economics, 28(10), pp. 1057-1069. ISSN 1466433X

Shang, L (2019) Achieving public agency goals in public-private partnerships using innovative payment mechanisms. PhD thesis, University of Washington, USA.

Sharafi, A; Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(2), pp. 87-103. ISSN 01446193

Sharafi, A; Sadegh Amalnick, M and Allah Taleizadeh, A (2021) Outcome of financial conflicts in the operation phase of public-private partnership contracts. Journal of Construction Engineering and Management, 147(6): 78622011, ISSN 0733-9364

Shen, L Y; Bao, H J; Wu, Y Z and Lu, W S (2007) Using bargaining-game theory for negotiating concession period for BOT-type contract. Journal of Construction Engineering and Management, 133(5), pp. 385-392. ISSN 0733-9364

Shen, L Y; Li, H and Li, Q M (2002) Alternative concession model for build operate transfer contract projects. Journal of Construction Engineering and Management, 128(4), pp. 326-330. ISSN 0733-9364

Shen, L Y and Wu, Y Z (2005) Risk concession model for build/operate/transfer contract projects. Journal of Construction Engineering and Management, 131(2), pp. 211-220. ISSN 0733-9364

Shi, X; Fu, K; Qiao, Y; Santos, J and Yuan, Z (2026) Accident cause analysis for lifting prefabricated components of assembled buildings based on hybrid simulation technology from human factor perspective. Engineering, Construction and Architectural Management, 33(1), pp. 578-601. ISSN 0969-9988

Shi, L; Wang, Y and Onishi, M (2024) Tie-formation mechanisms in evolving networks of sponsors in highway public-private partnerships. Journal of Construction Engineering and Management, 150(10): 04024128, ISSN 0733-9364

Shrestha, R B and Ogunlan, S (2006) Comparative study of power purchase agreements in the Nepalese environment. Journal of Financial Management of Property and Construction, 11(3), pp. 133-148. ISSN 1366-4387

Shrestha, R B and Ogunlana, S (2007) Direct stakeholder's perception of PPA clauses in the Nepalese environment. Journal of Construction in Developing Countries, 12(2), pp. 21-41. ISSN 1823-6499

Silva da Purificação, N R; Henrique, V B; Amorim, A; Carneiro, A and Souza, G H B (2024) Reconstruction and storage of a low-cost three-dimensional model for a cadastre of historical and artistic heritage. International Journal of Building Pathology and Adaptation, 42(2), pp. 237-256. ISSN 23984708

Simukonda, W and Kamwela, N (2021) The management of theft and vandalism on construction jobsites in the southern region of Malawi. Journal of Construction Business and Management, 5(1), pp. 47-59. ISSN 2521-0165

Skaik, Samer Hisham (2017) Introducing review mechanisms into statutory construction adjudication. PhD thesis, Deakin University, Australia.

Song, J; Song, D and Zhang, D (2015) Modeling the concession period and subsidy for BOT waste-to-energy incineration projects. Journal of Construction Engineering and Management, 141(10): 04015033, ISSN 0733-9364

Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations. PhD thesis, University of Michigan, USA.

Ssegawa, J K; Rwelamila, P D and Mogome, M G (2020) The challenges of closing construction projects final accounts in Botswana local authorities. Journal of Construction Business and Management, 4(1), pp. 13-23. ISSN 2521-0165

Staffa Junior, L B; Bastos Costa, D; Torres Nogueira, J L and Silva, A S (2025) Web platform for building roof maintenance inspection using uas and artificial intelligence. International Journal of Building Pathology and Adaptation, 43(1), pp. 4-28. ISSN 2398-4708

Straub, A (2011) Maintenance contractors acting as service innovators. Construction Innovation, 11(2), pp. 179-189. ISSN 1471-4175

Sun, Y and Zhang, L (2015) Balancing public and private stakeholder interests in BOT concessions: Minimum revenue guarantee and royalty scheme applied to a water treatment project in China. Journal of Construction Engineering and Management, 141(2): 04014070, ISSN 0733-9364

Sweis, R K (1988) Construction insurance in the Arab Gulf area: an analysis of cover and contracts. PhD thesis, City, University of London, UK.

Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193

Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2005) A GA-based borrowing strategy for construction smes in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Tang, C M; Wong, C W Y; Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: A Hong Kong case study. Construction Management and Economics, 24(4), pp. 349-365. ISSN 01446193

Tang, L C M and Leung, A Y T (2009) An entropy-based financial decision support system (E-FDSS) for project analysis in construction SMEs. Construction Management and Economics, 27(5), pp. 499-513. ISSN 1466433X

Tangwe, S and Simon, M (2019) Quantification of the viability of residential air source heat pump water heaters as potential replacement for geysers in South Africa. Journal of Engineering, Design and Technology, 17(2), pp. 456-470. ISSN 1726-0531

Tembo, C K (2018) Risk allocation on building projects in the Zambian construction industry. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Teo, Ai Lin Evelyn (1997) Strategic market positioning in the construction industry: Models for evaluating mobility and diversification. PhD thesis, University of New South Wales, Australia.

Tharun, T; Thounaojam, N; Devkar, G and Laishram, B (2025) Proactive contract theory-based resilience framework development for public-private partnerships. Construction Economics and Building, 25(2), pp. 253-275. ISSN 2204-9029

Thomas, A V; Kalidindi, S N and Ananthanarayanan, K (2003) Risk perception analysis of BOT road project participants in India. Construction Management and Economics, 21(4), pp. 393-407. ISSN 01446193

Tiong, R L K (1990) BOT projects: Risks and securities. Construction Management and Economics, 8(3), pp. 315-328. ISSN 01446193

Tiong, R L K (1992) Strategies in risk management of on-demand guarantees. Journal of Construction Engineering and Management, 118(2), pp. 229-243. ISSN 0733-9364

Tiong, R L K (1995) Risks and guarantees in BOT tender. Journal of Construction Engineering and Management, 121(2), pp. 183-188. ISSN 0733-9364

Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(2), pp. 83-94. ISSN 0969-9988

Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Tran, C N N; Tat, T T H; Tam, V W Y and Tran, D H (2023) Factors affecting intelligent transport systems towards a smart city: A critical review. International Journal of Construction Management, 23(12), pp. 1982-1998. ISSN 1562-3599

Ucbenli, C (2010) A bargaining mechanism with incomplete information and its application in trilateral BOT negotiations. PhD thesis, Columbia University, USA.

Uher, Thomas Edward (1990) The effect of risks and uncertainties on subcontract bid prices. Unpublished PhD thesis, University of New South Wales, Australia.

Ullah, F; Ayub, B; Siddiqui, S Q and Thaheem, M J (2016) A review of public-private partnership: Critical factors of concession period. Journal of Financial Management of Property and Construction, 21(3), pp. 269-300. ISSN 1366-4387

Ullah, F and Thaheem, M J (2018) Concession period of public private partnership projects: Industry-academia gap analysis. International Journal of Construction Management, 18(5), pp. 418-429. ISSN 1562-3599

Umar, T (2020) Developing toolkits and guidelines to improve safety performance in the construction industry in Oman. PhD thesis, London South Bank University, UK.

Vahdatmanesh, M; Firouzi, A and Rotimi, J O B (2022) Real options analysis of revenue risk sharing in post-disaster housing reconstruction. Journal of Financial Management of Property and Construction, 27(3), pp. 281-305. ISSN 1366-4387

Visscher, H; Meijer, F; Majcen, D and Itard, L (2016) Improved governance for energy efficiency in housing. Building Research & Information, 44(5-6), pp. 552-561. ISSN 0961-3218

Wade, F; Shipworth, M and Hitchings, R (2017) How installers select and explain domestic heating controls. Building Research & Information, 45(4), pp. 371-383. ISSN 0961-3218

Wamuziri, S (2023) Legislative framework for public-private partnerships in the Sultanate of Oman. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(3), pp. 150-156. ISSN 17514304

Wang, D Y and Wang, X (2025) Can reputation system complement limited inspection accuracy in deterring opportunistic claims? Engineering, Construction and Architectural Management, 32(3), pp. 1435-1456. ISSN 0969-9988

Wang, J (2022) BIM and construction dispute management. PhD thesis, University of Manchester, UK.

Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Foreign exchange and revenue risks: Analysis of key contract clauses in China's BOT project. Construction Management and Economics, 18(3), pp. 311-320. ISSN 01446193

Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Evaluation and management of political risks in China's BOT projects. Journal of Construction Engineering and Management, 126(3), pp. 242-250. ISSN 0733-9364

Wang, X; He, N and Li, X (2023) Social network analysis of the construction community in the anti-epidemic emergency project: A case study of wuhan huoshenshan hospital, China. Engineering, Construction and Architectural Management, 30(8), pp. 3539-3561. ISSN 0969-9988

Wang, Y; Chen, L and Zhuang, J (2023) Pricing of credit default swaps from the perspective of credit enhancement in PPP projects. Journal of Construction Engineering and Management, 149(6): 05023006, ISSN 0733-9364

Wang, Y and Jin, X (2019) Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example. Engineering, Construction and Architectural Management, 26(7), pp. 1348-1366. ISSN 0969-9988

Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.

Warsame, A (2011) Performance of construction projects: Essays on supplier structure, construction costs and quality improvement. PhD thesis, KTH Royal Institute of Technology, Sweden.

Weerasinghe, A S; Ramachandra, T and Nawarathna, A (2019) Effects of green retrofits: A case of industrial manufacturing buildings in Sri Lanka. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Weerasuriya, G T; Perera, S and Calheiros, R N (2025) Technological imperatives for issues in the certification of quality, progress, and payments in construction projects: A systematic review. Construction Economics and Building, 25(1), pp. 25-48. ISSN 2204-9029

White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193

Wibowo, A (2006) CAPM-based valuation of financial government supports to infeasible and risky private infrastructure projects. Journal of Construction Engineering and Management, 132(3), pp. 239-248. ISSN 0733-9364

Wibowo, A and Kochendoerfer, B (2011) Selecting BOT/PPP infrastructure projects for government guarantee portfolio under conditions of budget and risk in the Indonesian context. Journal of Construction Engineering and Management, 137(7), pp. 512-522. ISSN 0733-9364

Wibowo, A; Permana, A; Kochendörfer, B; Kiong, R T L; Jacob, D and Neunzehn, D (2012) Modeling contingent liabilities arising from government guarantees in Indonesian BOT/PPP toll roads. Journal of Construction Engineering and Management, 138(12), pp. 1403-1410. ISSN 0733-9364

Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.

Woodhead, R M and Downs, C G (2002) Facilitation as a research method to improve value management capabilities. Journal of Construction Research, 3(2), pp. 209-216. ISSN 1609-9451

Wu, M; Wing Chau, K; Shen, Q and Yin Shen, L (2012) Net asset value-based concession duration model for BOT contracts. Journal of Construction Engineering and Management, 138(2), pp. 304-308. ISSN 0733-9364

Xiao, Y; Liu, J and Pang, Y (2019) Development of a competency model for real-estate project managers: Case study of China. International Journal of Construction Management, 19(4), pp. 317-328. ISSN 1562-3599

Xiong, W and Zhang, X (2014) Concession renegotiation models for projects developed through public-private partnerships. Journal of Construction Engineering and Management, 140(5): 04014008, ISSN 0733-9364

Xu, J W; Jiang, L and Moon, S (2017) Determination of the optimal concession period for BOT contract projects based on a discrete stochastic process model. Journal of Construction Engineering and Management, 143(4): 04016119, ISSN 0733-9364

Xu, Z; Liang, Y; Lu, H; Kong, W and Wu, G (2023) An approach for monitoring prefabricated building construction based on feature extraction and point cloud segmentation. Engineering, Construction and Architectural Management, 30(10), pp. 5302-5332. ISSN 0969-9988

Yang, C (2004) Knowledge-based understanding and interpretation of construction engineering drawings. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yang, C Y; Xu, M X and Chen, W F (2007) Reliability analysis of shotcrete lining during tunnel construction. Journal of Construction Engineering and Management, 133(12), pp. 975-981. ISSN 0733-9364

Yao, Y P; Ruan, Y Z; Chen, J; Geng, Y; Zhang, X; Liu, B Y; Zong, X P and Yu, G Z (2018) Research on a real-time monitoring platform for compaction of high embankment in airport engineering. Journal of Construction Engineering and Management, 144(1): 04017096, ISSN 0733-9364

Ye, S and Tiong, R L K (2003) The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics, 21(5), pp. 471-482. ISSN 01446193

Ye, S and Tiong, R L K (2004) Public-private partnership for power projects: A case study of Hub power project. Journal of Financial Management of Property and Construction, 9(3), pp. 129-140. ISSN 1366-4387

Yuan, J; Zeng, A Y; Skibniewski, M J and Li, Q (2009) Selection of performance objectives and key performance indicators in public-private partnership projects to achieve value for money. Construction Management and Economics, 27(3), pp. 253-270. ISSN 1466433X

Zani, A; Speroni, A; Mainini, A G; Zinzi, M; Caldas, L and Poli, T (2024) Customized shading solutions for complex building façades: The potential of an innovative cement-textile composite material through a performance-based generative design. Construction Innovation, 24(1), pp. 256-279. ISSN 1471-4175

Zapata Quimbayo, C A; Mejía Vega, C A and Marques, N L (2019) Minimum revenue guarantees valuation in PPP projects under a mean reverting process. Construction Management and Economics, 37(3), pp. 121-138. ISSN 01446193

Zhang, H; Yu, L and Zhang, W (2020) Dynamic performance incentive model with supervision mechanism for PPP projects. Engineering, Construction and Architectural Management, 27(9), pp. 2643-2659. ISSN 0969-9988

Zhang, S; Li, J; Li, Y and Zhang, X (2021) Revenue risk allocation mechanism in public-private partnership projects: Swing option approach. Journal of Construction Engineering and Management, 147(1): 04020153, ISSN 0733-9364

Zhang, S; Zhang, S; Gao, Y and Ding, X (2016) Contractual governance: Effects of risk allocation on contractors' cooperative behavior in construction projects. Journal of Construction Engineering and Management, 142(6): 04016005, ISSN 0733-9364

Zhang, W R; Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (1998) Risk management of Shanghai's privately financed Yan'an Donglu tunnels. Engineering, Construction and Architectural Management, 5(4), pp. 399-409. ISSN 0969-9988

Zhang, X (2005) Financial viability analysis and capital structure optimization in privatized public infrastructure projects. Journal of Construction Engineering and Management, 131(6), pp. 656-668. ISSN 0733-9364

Zhang, X (2006) Toward innovative and efficient infrastructure delivery. PhD thesis, University of Alberta, Canada.

Zhang, X (2009) Win-win concession period determination methodology. Journal of Construction Engineering and Management, 135(6), pp. 550-558. ISSN 0733-9364

Zhang, Y; Yuan, J; Zhao, J; Cheng, L and Li, Q (2022) Hybrid dynamic pricing model for transport PPP projects during the residual concession period. Journal of Construction Engineering and Management, 148(2): 04021200, ISSN 0733-9364

Zhang, Z; Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(7), pp. 2615-2634. ISSN 0969-9988

Zhao, J (2014) Performance modeling and optimization solutions for networking systems. PhD thesis, University of Hong Kong, Hong Kong.

Zheng, X; Chen, J; Xia, B; Skitmore, M and Zeng, S (2023) Understanding the megaproject social responsibility network among stakeholders: A reciprocal-exchange perspective. Journal of Construction Engineering and Management, 149(11): 04023105, ISSN 0733-9364

Zhi, H (1992) The economic risk analysis in international construction markets. PhD thesis, University of Reading, UK.

Zhong, B; Zhong, W; Wu, H; Guan, Q; Tang, B and M.e Sepasgozar, S (2025) Strategic impacts of blockchain adoption on contractor decisions in competitive construction markets: A game-theoretic approach. Journal of Construction Engineering and Management, 151(12): 04025203, ISSN 0733-9364

Zhou, H W; Zhou, Y H and Zhao, C J (2016) Fault-response mechanism of production system in concrete-dam-construction simulation. Journal of Construction Engineering and Management, 142(11): 04016065, ISSN 0733-9364

Zhou, Y; Liu, J; Pu, X and Ding, Y (2025) Signaling game analysis of transfer mechanisms of PPP projects: Considering investors' moral hazard and adverse selection behavior. Journal of Construction Engineering and Management, 151(5): 04025030, ISSN 0733-9364

Zhu, B and Liu, G (2025) The development model of sustainable campus based on green buildings: A systematic comparative study between Japan and China. Engineering, Construction and Architectural Management, 32(2), pp. 805-823. ISSN 0969-9988

Zhuang, J; Wang, Y; Yan, Z and Liu, J (2026) Evolutionary game analysis on the cooperative mechanism of government subsidies and market-based risk mitigation institutions in managing ecosustainable projects' default risks. Journal of Construction Engineering and Management, 152(3): 04025270, ISSN 0733-9364

Zou, P X W; Shi, V Y and Li, Z (2010) An econometric evaluation framework for investment in construction safety. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

e Silva, H B G (2024) Mitigating information asymmetry in the 5g era: Unveiling practices that restrict users' internet access. PhD thesis, Universidade do Porto, Portugal.

van den Hurk, M (2015) What's the deal? Standardizing contracts for public-private partnerships. PhD thesis, Universiteit Antwerpen, Belgium.

Şentürk, H A; Yazici, G and Kaplanoǧlu, S B (2004) Case study: Izmit domestic and industrial water supply build-operate- transfer project. Journal of Construction Engineering and Management, 130(3), pp. 449-454. ISSN 0733-9364

This list was generated on Sat Aug 22 02:36:10 2026 UTC.