Abd Jamil, A H and Fathi, M S (2018) Contractual challenges for BIM-based construction projects: A systematic review. Built Environment Project and Asset Management, 8(4), pp. 372-385. ISSN 2044-124X
Abdullah Habib, S N H (2017) Critical success factors and contractual risks for Private Finance 2 projects implementing building information modelling. PhD thesis, University of Salford, UK.
Alfadhli, A (2013) Does the alternative dispute resolution have a role to play in the construction industry in the State of Kuwait?: look into the most appropriate methodology that may be taken in Kuwait in comparison with what are available in the English legal system. PhD thesis, University of Southampton, UK.
Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.
Arvanitis, D (2017) Collaboration and contract management in the context of offshore oil and gas contracts: an English law analysis. PhD thesis, City, University of London, UK.
Bastien, A N (2002) Successful organisational and human practices in the UK construction industry: proposing the CONSTRUCT framework of good practice. PhD thesis, University of Warwick, UK.
Brand, M C and Uher, T E (2004) Adjudication determinations in Australia. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Brooks, T; Spillane, J; Tansey, P and Hendron, C (2016) The impact of the recent economic recession on the operation of the NEC contract in Northern Ireland. Construction Management and Economics, 34(6), pp. 393-417. ISSN 01446193
Chan, E H W (1997) Amicable dispute resolution in the people's republic of China and its implications for foreign-related construction disputes. Construction Management and Economics, 15(6), pp. 539-548. ISSN 01446193
Chang, Y H and Tang, B (2005) Trust, partnership and power in construction: Theory and applications in Hong Kong. Journal of Construction Procurement, 11(2), pp. 94-111.
Charlson, J and Oduoza, C (2014) Legal risk identification for SMEs in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Chong, H-Y and Oon, C K (2016) A practical approach in clarifying legal drafting: Delphi and case study in Malaysia. Engineering, Construction and Architectural Management, 23(5), pp. 610-621. ISSN 0969-9988
Connell, A and Mason, J (2014) Isn't all loss consequential? A review of recent case law and its relevance to contractual practices within the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Connell, A and Mason, J (2015) Isn't all loss consequential? A review of recent case law and its relevance to contractual practices within the built environment. International Journal of Law in the Built Environment, 7(3), pp. 176-194. ISSN 1756-1450
Cox, A and Thompson, I (1998) Has contracting lost its customer focus? Journal of Construction Procurement, 4(1), pp. 5-15. ISSN 1358-9180
Craig, R W (2000) Controversial aspects of Commonwealth Construction and Engineering Procurement Law. PhD thesis, Loughborough University, UK.
Craig, R W and Barnes, W C (2007) Professional employees' exposure to risk of negligence claims from the client. Construction Management and Economics, 25(7), pp. 811-819. ISSN 1466433X
Crawley, S E (2017) The difference in how UAE and EW law controls Gharar (risk) and so Riba in a construction contract in the Emirate of Dubai, UAE. PhD thesis, Robert Gordon University, UK.
Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.
De Blois, M; Herazo-Cueto, B; Latunova, I and Lizarralde, G (2011) Relationships between construction clients and participants of the building industry: Structures and mechanisms of coordination and communication. Architectural Engineering and Design Management, 7(1), pp. 3-22. ISSN 1745-2007
Donohoe S, C J (2013) Enforceability of exemption clauses in construction contracts: A comparative study of approaches in England and Australia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Dyas, V (2008) Constituents of performance: investigating relational contracting in a construction industry setting to establish a framework for drivers of performance. PhD thesis, Kingston University, UK.
Faraziera, M R; Emma, M N and Jamaluddin, Y (2010) Legal issues of partnering in construction industry: Malaysia contract law system. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Finnie, D (2013) Comparison of time adjustment clauses between DZ3910, AS4000 and STCC. Construction Economics and Building, 13(1), pp. 66-84. ISSN 2204-9029
Finnie, D; Ali, N A and Park, K (2019) Design development post contract signing in New Zealand: Client's or contractor's cost? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 146-156. ISSN 17514304
Harper, C M (2014) Measuring project integration using relational contract theory. PhD thesis, University of Colorado at Boulder, USA.
Hassanein, A A G and El Nemr, W (2008) Claims management in the Egyptian industrial construction sector: A contractor's perspective. Engineering, Construction and Architectural Management, 15(3), pp. 246-259. ISSN 0969-9988
Hedborg, S (2022) ”It’s in the between”: Inter-project organising in project ecologies. PhD thesis, KTH Royal Institute of Technology, Sweden.
Hojem, T S M; Sørensen, K H and Lagesen, V A (2014) Designing a green building: Expanding ambitions through social learning. Building Research & Information, 42(5), pp. 591-601. ISSN 0961-3218
Kaggiah, G M B (2022) Strategies for improving the sustainability of SMEs in the construction industry in Malawi. PhD thesis, University of Bolton, UK.
Kwawu, W E K (2009) Relational contracting in the UK construction sector. PhD thesis, University of Reading, UK.
Lim, T (2009) Essence of time in construction contracts. Construction Economics and Building, 9(2), pp. 1-6. ISSN 2204-9029
Mansfield, J (2009) The service of notices by commercial property managers in England and Wales: Lessons for property and legal professionals. International Journal of Law in the Built Environment, 1(3), pp. 244-254. ISSN 1756-1450
Manu, E; Ankrah, N; Chinyio, E A and Proverbs, D (2016) Functional consequences of trust in the construction supply chain: A multi-dimensional view. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Martin, S D (1981) Building contracts in classical Roman law. PhD thesis, University of Michigan, USA.
Meng, X (2002) Guarantees for contractor's performance and owner's payment in China. Journal of Construction Engineering and Management, 128(3), pp. 232-237. ISSN 0733-9364
Mesa, H A (2016) Modeling performance of integrated project delivery systems in design and construction. PhD thesis, University of Colorado at Boulder, USA.
Milner, A (2011) Contract interpretation: Potential for relaxing the exclusionary rule. International Journal of Law in the Built Environment, 3(3), pp. 205-221. ISSN 1756-1450
Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.
Mirzaee, A M and Martek, I (2025) Improving project management "closeout" phase outcomes: Evidence from a large general contractor in Iran using "x-inefficiency theory". Engineering, Construction and Architectural Management, 32(8), pp. 5253-5271. ISSN 0969-9988
Morrison, S and Trushell, I (2016) Payment for offsite goods and materials: The Scottish perspective. Construction Management and Economics, 34(10), pp. 679-687. ISSN 0144-6193
Nielsen, Y; Kumas, N and Ciftci, C (2006) ICT use in Turkish construction sector: Existing laws and regulations. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(3), pp. 281-295. ISSN 2044-124X
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988
Qin, B (2019) Change and continuity: making sense of marketization in the Chinese construction sector. PhD thesis, University of Reading, UK.
Rana, Ansar Rehman (2024) A proposal to reduce the complexity of the Australian law of contract. PhD thesis, University of Adelaide, Australia.
Rose, T M and Manley, K (2012) Adoption of innovative products on Australian road infrastructure projects. Construction Management and Economics, 30(4), pp. 277-298. ISSN 1466433X
Ryan, E C (2001) An economic analysis of the standard construction contract. PhD thesis, King's College London, UK.
Sarie Eldin, H S (1995) Consortia agreements in the international construction industry: With special reference to Egypt. PhD thesis, Queen Mary University of London, UK.
Starzyk, G F (2014) Alliance contracting: Enforceability of the consensusdocs 300 mutual waiver of liability in us courts. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Trushell, I (2016) Everything's coming up (silk) roses. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Ward, P and Jefferies, M (2014) Are Australian standard forms of construction contract capable of dealing with the issue of extensions of time efficiently and effectively? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Winch, G M (2000) Institutional reform in British construction: Partnering and private finance. Building Research & Information, 28(2), pp. 141-155. ISSN 0961-3218
Wong, W F and Cheah, C Y J (2004) Issues of contractual chain and sub-contracting in the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Yin, Chin Nyuk (1981) The doctrine of fundamental breach in contract law. PhD thesis, Australian National University, Australia.
Younes, B (2013) A framework for invoice management in construction. PhD thesis, University of Alberta, Canada.
Zhang, Y; Wang, Y and Yao, H (2022) How does the embeddedness of relational behaviours in contractual relations influence inter-organisational trust in construction projects? Engineering, Construction and Architectural Management, 29(1), pp. 222-244. ISSN 0969-9988
af Hällström, A; Bosch-Sijtsema, P; Poblete, L; Rempling, R and Karlsson, M (2021) The role of social ties in collaborative project networks: A tale of two construction cases. Construction Management and Economics, 39(9), pp. 723-738. ISSN 01446193
Up a level